Source file signed link, expires in 15 minutes
Extracted text 15
Page 1
Annual Public Expose
PT Solusi Environment Asia Tbk (IDX: SOFA)
21 May 2026
FY2025
Page 2
Disclaimer
This presentation has been prepared by PT Solusi Environment The Company makes no representation, warranty, or prediction
Asia Tbk (the “Company”) for informational purposes only. that the results anticipated by such forward-looking statements
Certain statements contained herein may constitute “forward- will be achieved, and such forward-looking statements, in each
looking statements,” including statements regarding the case, represent only one of several possible scenarios and
Company’s expectations and projections relating to future should not be regarded as the most likely or standard scenario.
operational performance and business prospects.
By reviewing this presentation, you acknowledge and agree
Such forward-looking statements are based on several that you are solely responsible for making your own
assumptions concerning the Company’s current and future independent assessment of the market and market conditions
business strategies and the environment in which the Company relating to the Company, and that you will conduct your own
expects to operate in the future. These forward-looking analysis and assume full responsibility for forming your own
statements speak only as of the date on which they are made. view regarding the Company’s potential future business
performance.
Accordingly, the Company expressly disclaims any obligation to
update or revise any forward-looking statements contained in
this document, whether as a result of new information, future
events, or otherwise.
Page 3
Rules of Conduct of Public Expose 2026 (or the “Event”) 1) All sessions will be conducted electronically via Zoom Meeting and delivered in Indonesian. 2) Participants of the Event are shareholders or members of the media whose participation has been confirmed no later than 20 May 2026 at 15:00 WIB. 3) Participants must use the same display name on their Zoom account as the name provided during registration in order to participate in all sessions. Failure to comply may result in the participant being removed from the Event and/or restricted from submitting questions by the Event administrator. 4) The Event comprised two sessions: Presentation by the Board of Directors & Question and Answer (“Q&A”) 5) Questions may only be submitted via Zoom Meeting chat after the presentation has concluded and the Q&A session has commenced. 6) Each participant is entitled to submit one question only. Follow-up questions will not be permitted, and only questions relevant to the presentation topic will be addressed. 7) The Event will conclude at 13:45 WIB in preparation for the subsequent Annual General Meeting of Shareholders.
Page 4
Annual Public Expose 2026 Agenda
COMPANY PROFILE
BUSINESS & FINANCIAL OVERVIEW
PROJECT PIPELINE
Page 5
Vision
To build Indonesia’s leading green infrastructure platform by acquiring,
developing, and compounding value in essential clean energy assets
across the archipelago, for decades.
Mission
To seek and acquire undervalued infrastructure assets at the intersection of Indonesia’s
urbanisation and energy transition — and operate them with discipline, for decades.
To deploy proven technologies, starting with Waste-to-Energy, where the economic case is
clear, the social need is real, and Indonesia’s regulatory environment provides durable
concession protection.
To earn the trust of shareholders, partners, and communities through transparent capital
allocation and governance we are always prepared to defend publicly.
Page 6
Milestones
2012 2014 2020 2022 Oct 2025 Dec 2025 Dec 2025 Feb 2026 Mar 2026
The First factory Officially Obtained Acquired by EGMS Announcement Established PT Successfully
company in Cikupa, listed in the Timber Legality PT Asia completed: of planned Ananta Energi completed the
established Tangerang IDX under Assurance Investment name change diversification Asia as a new corporate
under the commence the name System (SVLK) Capital to PT Solusi to renewable subsidiary in action
name PT d operations PT Boston Certification through Environment energy through the energy Mandatory
Pratama Furniture direct Asia Tbk and our subsidiary, sector Tender Offer
Cipta Industries purchase of new Board of PT Parivarta following the
Tbk shares Management Energi acquisition
(“SOFA”) appointed Nusantara
Page 7
Board of Management
effective since 19 December 2025
Denny Rizal Ezra Mohammed Dimas Adiyasa Djoko Hendratto
Managing Dhanaguna Wiraatmaja Independent
Director Director Director Commissioner
Page 8
Shareholding Structure as of May 2026
Page 9
Business Overview
Showroom New Collection Sales Performance
FY2025 Sold Units
SURABAYA 267 Tables
Pakuwon Square*
*closed in Jan 2026
996 Seatings
JAKARTA
Jakarta Design Center Sales
(FY 2025)
86 Casegoods
SINGULAR
[Launched in Aug 2025]
The “Singular” Collection 57 Bed
brings together four
JAKARTA distinctive creations, each
Permata Hijau defined by a bold identity
and unique detailing.
33 Accessories
Page 10
Profit and Loss
in IDR (millions)
2024 2025
50.252
45.131
In FY 2025, recorded over a
fourfold increase in Net
Loss, due to:
• 10,19% decrease in Sales
• 6,81% increase in Cost of
Goods Sold, compared to
FY 2024.
-910
-5.298
Revenue Net Profit (Loss)
Page 11
Balance Sheet
In IDR millions
2024 2025
62.447
Total Assets declined by 16,73%
from 2024, driven by reductions in
51.999
cash, fixed assets, and right-of-
44.794 use assets.
38.937 Total Equity decreased by
12,86% following losses incurred
throughout the year.
Total Liabilities fell by 26,75%,
primarily driven by settlement of
17.652
bank loans & lower lease
12.963
liabilities.
Assets Equity Liability
Page 12
Stock Movement during FY2025
400 700
644 372
350
340
The Company’s share price
600
300
276 500
performance throughout
FY2025 may reflect
405
250
367 368
400
sustained positive market
200
309
sentiment and
148 276 300
strengthening long-term
shareholder conviction,
150
225 224
210
188 189
112
especially in light of the
200
100
67 68 73
43 45
59 52 48 acquisition by PT Asia
Investment Capital.
100
50
0 0
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Transaction Volume (Mn) Closing Price (IDR '000)
Page 13
Strategic Alignment with National Energy
Transition Agenda
Indonesia’s population is projected to grow from approximately 284 million in 20252 to 294 million by 20302, supporting
long-term growth in electricity demand. Alongside economic expansion, Indonesia’s electricity consumption per capita is
expected to increase to 4,900kWh per capita by 20503, growing at a CAGR of 4.6% from 2025 level of 1,584kWh3. The
Government continues to accelerate renewable energy development as part of its long-term energy transition strategy.
Indonesia Planned Power Capacity Addition Mix (2025 – 2034) ¹
(In GW) PLN plans to add 69.5 GW of new power generation
capacity between 2025 – 2034, with approximately 61%
expected to be sourced from renewable energy1
42.6
69.5 -42,60
69,50
10.3
-10,30
-16,60
16.6 Renewable Energy Energy Storage Fossil Fuel
42.6 GW 10.3 GW 16.6 GW
Total New Power Capacity Planned Renewable Energy (EBT) Energy Storage Fossil Fuel
Total New Power Renewable Energy Storage Fossil Fuel Solar – 17.1 GW Battery – 6.0 GW Gas – 10.3 GW
Capacity Energy (EBT) Hydro – 11.7 GW Others – 4.3 GW Coal – 6.3 GW
Planned Wind – 7.2 GW
Geothermal – 5.2 GW
Others – 1.4 GW
Source: (1) Kementerian Energi dan Sumber Daya Mineral and PLN, RUPTL PT PLN
(Persero) Tahun 2025–2034, Press Conference Material, Jakarta, 26 May 2025; (2) Badan
Pusat Statistik; (3) Ministry of Energy and Mineral Resources
Page 14
Project Pipeline in Renewable Energy
Built on decades of operational experience in manufacturing, the Company has strategically
transitioned into clean energy through targeted investments and partnerships, positioning itself to
capture long-term opportunities in Indonesia’s energy transition.
WASTE TO ENERGY POWER PLANT
• Seeking to participate in the Waste-to-Energy projects under PT Danantara Investment
Management.
• Greater project certainty, under Presidential Regulation No. 109/2025, through secured land
allocation, power purchase tariff arrangements, and guaranteed waste supply.
• Waste-to-energy converts municipal waste into electricity, reducing landfill dependency while
generating renewable power and supporting circular economy initiatives in urban areas.
MINI HYDRO POWER PLANT
• Currently undergoing due diligence for hydro power plant projects across Java.
• Hydropower provides stable baseload renewable energy with low operating costs and long
asset lifespans (30–50 years), making it a reliable contributor to Indonesia’s energy mix.
• Has secured offtake for electricity, improved production efficiency, and well-positioned for further
development potential.
Page 15
Thank You Contact Us PT Solusi Environment Asia Tbk Phone: +62 21 5290 7351 Mail: corsec@solusienvironmentasia.com
Names mentioned 15 people and organisations named in the text · linked when the evidence is strong
unresolved
org
Asia Tbk
p.2 ×3
unresolved
org
PT Boston
p.6
unresolved
org
PT Parivarta
p.6
unresolved
org
PT Asia Investment Capital.
p.12
unresolved
org
Kementerian Energi dan Sumber Daya Mineral and PLN
p.13
unresolved
org
PT PLN (Persero)
p.13
unresolved
org
Pusat Statistik
p.13
unresolved
org
Ministry of Energy and Mineral Resources
p.13
unresolved
org
PT Danantara Investment Management.
p.14
Extraction attempts how the parser did, and what it refused
Nothing structured was extracted from this document — the attempts below say why.
No extraction attempted yet.