Skip to content
Back to announcement

20240528_PTPS_Laporan Penggunaan Dana Hasil Penawaran Umum_31643022_lamp1.pdf

Other Text extracted PTPS

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 4

Page 1
                                               LAPORAN REALISASI PENGGUNAAN DANA HASIL PENAWARAN UMUM
                                                                    PT PULAU SUBUR TBK
                                                                   PER 31 DESEMBER 2023
                                                                          (REVISI)



                                     Nilai Realisasi Hasil Penawaran Umum                 Rencana Penggunaan Dana             Realisasi Penggunaan Dana
        Jenis                                                                                                                                                 Sisa Dana Hasil
                 Tanggal
No   Penawaran                Jumlah Hasil          Biaya                             Pembangunan                          Pembangunan                          Penawaran
                  efektif
       Umum                    Penawaran          Penawaran         Hasil Bersih      Pabrik Kelapa       Modal Kerja      Pabrik Kelapa     Modal Kerja          Umum
                                 Umum               Umum                                 Sawit                                Sawit


                    9
1    IPO SAHAM   Oktober    Rp89.100.000.000    Rp3.968.297.412   Rp85.131.702.588   Rp42.565.851.294   Rp42.565.851.294         -         Rp6.384.188.640   Rp78.747.513.948
                  2023




                                                                                                            Palembang, 25 Maret 2024




                                                                                                                       Felix Safei
                                                                                                                    (Diektur Utama)
Page 2
                                   RINCIAN BIAYA PENAWARAN UMUM SAHAM PERDANA
                                                  PT PULAU SUBUR TBK
                                                 PER 31 DESEMBER 2023
                                                        (REVISI)




                                                           Rencana                           Realisasi
No                    Rincian Biaya
                                                     %           Jumlah              %               Jumlah
1    Biaya jasa penjaminan (underwriting fee)      1,87%      1.665.000.000        1,87%        1.665.000.000
2    Biaya jasa penyelenggaraan (management fee)   0,37%       331.312.412         0,37%         331.312.412
3    Biaya jasa Lembaga penunjang pasar modal      0,11%       97.125.000          0,11%            97.125.000
4    Biaya jasa profesi penunjang pasar modal      1,29%      1.148.975.000        1,29%        1.148.975.000
5    Biaya jasa konsultasi keuangan                0,45%       400.000.000         0,45%         400.000.000
6    Biaya pendaftaran dan lain-lain               0,37%       325.885.000         0,37%         325.885.000
                          Jumlah                   4,45%      3.968.297.412        4,45%        3.968.297.412



                                                                              Palembang, 25 Maret 2024




                                                                                     Felix Safei
                                                                                  (Diektur Utama)
Page 3
                                                        RINCIAN REALISASI PENGGUNAAN DANA
                                                                PT PULAU SUBUR TBK
                                                               PER 31 DESEMBER 2023
                                                                      (REVISI)


        A. PEMBANGUNAN PABRIK KELAPA SAWIT

    No                            RINCIAN                              REALISASI             KETERANGAN
1            Pembangunan Pabrik Kelapa Sawit (kapasitas 10 ton/jam)        -                      -




        B. MODAL KERJA

No                                RINCIAN                              REALISASI             KETERANGAN
    1     Pembelian 1 unit Excavator KOBELCO SK200-10HD               1.443.000.000         Pembelian Tunai
    2     Pembelian 3 unit Tractor MASSEY FERGUSON MF5710ES           1.831.500.000         Pembelian Tunai
    3     Pembelian 1 unit Grader KOMATSU GD535                        100.000.000           Down Payment
    4     Pemeliharaan Jalan lingkungan                               3.009.688.640
          Jumlah                                                      6.384.188.640



                                                                                            Palembang, 25 Maret 2024




                                                                                                   Felix Safei
                                                                                                (Diektur Utama)
Page 4
                    LAPORAN PENEMPATAN SISA DANA HASIL PENAWARAN UMUM
                                    PT PULAU SUBUR TBK
                                   PER 31 DESEMBER 2023
                                          (REVISI)




No            RINCIAN                        NOMINAL                      KETERANGAN
1       Deposito Bank J TRUST              20.000.000.000            Bunga 7% , Tenor 14 hari
2     Deposito Bank BCA SYARIAH            11.000.000.000           Bunga 5,5% , Tenor 1 bulan
3         Deposito Bank DBS                10.000.000.000           Bunga 5,5% , Tenor 1 bulan
4         Deposito Bank BRI                15.000.000.000           Bunga 5,6% , Tenor 6 bulan
5      Deposito Bank MAYBANK               10.000.000.000           Bunga 5,6% , Tenor 1 bulan
6    Rekening Koran Bank MANDIRI           10.000.000.000                        -
7      Rekening koran Bank BNI              2.747.513.948                        -



                                                             Palembang, 25 Maret 2024




                                                                     Felix Safei
                                                                  (Diektur Utama)

File

File Open PDF
Source IDX
Size0.19 MB
Published28 May 2024
Pages4
Characters6,218
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 5 people and organisations named in the text · linked when the evidence is strong

linked org PULAU SUBUR TBK p.1 ×11
linked org Bank MANDIRI p.4
possible org Bank DBS p.4
unresolved org Bank BCA SYARIAH p.4
unresolved org Bank BRI p.4

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result