Page 1 OCR 0.750
AMMAN ANN Exploration Report - Guarter 12024 Introduction During the period 1 January 2024 to 31! March 2024 (O1 2024), PT Amman Mineral Nusa Tenggara (PT AMNT), a subsidiary of PT Amman Mineral Internasional (PT AMI), carried out exploration activities on IUPK Blocks I, Il and III, located in Sumbawa, Indonesia (Figure 1). There was no field exploration within Block IV, Lampui. Total exploration expenditure for A1 2024 was approximately USD $ 6.38 M. NU me Lombok » LN 5G Tano Port Mataram Pre Tana For Sumbawa yet omar po Lombok Int'1 # Airport "Taliwang Ka g tu, - Io wu ini Le henete poni vi Uu | Lunyuk »s » T— x AN 3 1, N ' ' Zola » INDONESIA en Sumbawa AMNT Asset Jakarta. 53 : CJ ver pt AmnT @ Batu Hijau Mine Operation . aa ar Project Area — @ Elang Cu-Au Project Figure 1. PT AMNT IUPK blocks, Sumbawa, Indonesia. Batu Hijau Block | Expenditure: e In pit resource drilling program costs, including core sample assay costs, amounted to approximately USD $ 3.18 M. amman.co.id Work areas: e Batu Hijau Cu-Au mine. Exploration parties: # Manager - AMNT Mine Technical Service (MTS). e Drilling contractor - PT Minera Nusa Drillindo (PT MND). e Assay laboratory - Intertek Utama Service (ITS). PT AMMAN MINERAL INTERNASIONAL TBK MENARA KARYA 6TH LEVEL, JALAN H.R. RASUNA SAID BLOK X-5 KAV. 1-2 JAKARTA, INDONESIA 12950 T 4622157994600 F. 462 215296 4136 1
Page 2 OCR 0.846
AMMAN ANN # Umpire assay laboratory - PT Geoservices. Assessment methods: # Diamond coring (12 drill rigs). Objectives: e The aim of the on-going drill program is to improve the confidence classifications of resources below the Batu Hijau Phase-8 pit design. Exploration Results: » 30 drill holes, completed or in progress, totaling 14,561.6 m (Figure 2). e Core samples submitted to the assay lab amounted to 4,501. Forward Plan: » The resource drilling program (12 rigs) will continue in G2 2024. NNW MMAN Pj & Ss & S 2 “5 amman.co.id @ In Progress Drilling A1-2024 @ Completed Drilling A1-2024 Phase 8 Boundary 7 Figure 2. Batu Hijau Block I @1 2024 - In Pit Drill Collar Locations. PT AMMAN MINERAL INTERNASIONAL TBK MENARA KARYA 6TH LEVEL, JALAN H.R. RASUNA SAID BLOK X-5 KAV. 1-2 JAKARTA, INDONESIA 12950 T 4622157994600 F. 462 215296 4136 2
Page 3 OCR 0.877
AMMAN ANN Elang Block II Expenditure: e Exploration activities included drilling and geological mapping. Costs were circa USD $ 2.61M. Work Areas: e Elang Cu-Au Project e Alma Cu-Au Project » Sebu East Project. Exploration Parties: » Manager - AMNT Exploration. e Drilling contractor - PT Minera Nusa Drillindo (PT MND). e Assay Laboratory (drill core, rock) - Intertek Utama Service (ITS). Assessment Methods: e Diamond drilling (3 rigs). » Geological mapping (including rock sampling). e Alteration analyses using an ASD Terra Search 4 Mineral Spectrometer. Objectives: » Resource development drilling continued at the Elang Cu-Au deposit (Figure 3). The purpose of this infill program was to explore information gaps, improve the geological model and to increase the confidence level of resource classifications. Drilling in progress at Elang South is testing the southern and depth limits of the Cu-Au resource block model. e Exploration drilling at Alma tested for potential Cu-Au porphyry mineralization beneath a lithocap (Figure 3). Detailed geological mapping was also undertaken. e Detailed geological mapping at Sebu East, over a significant Induced Polarisation (IP) conductivity and resistivity anomaly (Figure 3). Exploration Results: » Elang Block diamond drilling (11 holes for 4,893.6 m): o Elang Cu-Au resource infill & exploration - & holes, completed or in progress, totaling 3,021.8 m. o Alma Cu-Au exploration - 5 holes, completed or in progress, amounting to 1,871.8 m. # Core samples submitted to the assay lab amounted to 1,655. e Geological mapping program: o Sebu East -10 rock samples were submitted to the lab. Forward Plan: » Elang resource definition diamond drilling (2 rigs) will continue in @2 2024. # Alma exploration diamond drilling (1 rig) will finish in A2 2024. e Sebu East exploration drilling (1 rig), over a porphyry Cu-Au target, will start in G2 2024. amman.co.id PT AMMAN MINERAL INTERNASIONAL TBK MENARA KARYA 6TH LEVEL, JALAN H.R. RASUNA SAID BLOK X-5 KAV. 1-2 JAKARTA, INDONESIA 12950 T 4622157994600 F. 462 215296 4136 3
Page 4 OCR 0.797
AMMAN NNNN 5 UPK PT AMNT NW. AMMAN amman.co.id dis | 1Km: 9008000 N In Progress Drilling @1-2024 Completed Drilling A1-2024 Previous Holes N P22ZA Mapping Area @1-2024 538000 FE: 549000 EN / 542000 E . 544000 9010000 N 9012000 N 9014000 N 9006000 N 9004000 N Figure 3. Elang Block II A1 2024 - Exploration Locations. PT AMMAN MINERAL INTERNASIONAL TBK MENARA KARYA 6TH LEVEL, JALAN H.R. RASUNA SAID BLOK X-5 KAV. 1-2 JAKARTA, INDONESIA 12950 T 4622157994600 F. 462 215296 4136
Page 5 OCR 0.874
AMMAN ANN Rinti Block III Expenditure: e Exploration drilling program and geological mapping costs, including core sample and rock assay costs, amounted to approximately USD $ 0.59 M Work Areas: e Rinti Cu-Au Project. Exploration Parties: » Manager - AMNT Exploration. » Drilling contractor - PT Minera Nusa Drillindo (PT MND). e Assay Laboratory (rocks) - Intertek Utama Service (ITS). Assessment Method: # Diamond drilling (1 rig). » Geological mapping (including rock sampling). Objectives: » The aim of the current exploration drilling program is to test for potential Cu-Au porphyry mineralization beneath a lithocap (Figure 4). e Detailed geological mapping was carried out over a significant Cu-Au soil anomaly in the SW portion of the Rinti Block (Figure 4). Exploration Results: e Rinti diamond drilling - 2 holes, completed or in progress, amounted to1,374.0 m. e Core samples submitted to the assay lab amounted to 646. e Geological mapping program - 66 rock samples were submitted to the lab. Forward Plan: e The exploration drilling program (1 rig) will continue in A2 2024. amman.co.id PT AMMAN MINERAL INTERNASIONAL TBK MENARA KARYA 6TH LEVEL, JALAN H.R. RASUNA SAID BLOK X-5 KAV. 1-2 JAKARTA, INDONESIA 12950 T 4622157994600 F. 462 215296 4136 5
Page 6 OCR 0.736
AMMAN ANN 562000 564000 E 566000 E NNW AMMAN IUPK PT AMNT BekolarCamp 53 z L o a— Na 8- . 8 z 8 |. 2 8 K.Beringin Camp 2 2 IMEI Ouariz Vein (ES aargillic Aiteration N g PPP vuggy Guartz (PE Aavance Argillic Alteration 8) | Hydrothermal Breccia DA | Phyllic Alteration 8 . . ai ng Silica Alteration 500m @ In Progress Drilling @1-2024 2 Completed Drilling A1-2024 2 “ Previous Holes g (117//Mapping Area @1-2024 HJ (Cc MoisTEM Resistivity at depth 100m E « Figure 4. Rinti Block TT @1 2024 - Exploration Tocations. Lampui Block IV No field work or costs incurred in @1 2024. An exploration drilling program (1 rig), over a Cu-Au target developed last year, is due to commence in A2 2024. PT AMMAN MINERAL INTERNASIONAL TBK MENARA KARYA 6TH LEVEL, JALAN H.R. RASUNA SAID BLOK X-5 KAV. 1-2 JAKARTA, INDONESIA 12950 T 4622157994600 F. 462 215296 4136 6
Names mentioned 10 people and organisations named in the text · linked when the evidence is strong
unresolved
org
PT Amman Mineral Nusa Tenggara
p.1
unresolved
org
PT AMNT
p.1
unresolved
org
PT AMI
p.1
unresolved
org
PT AMNT IUPK
p.1
unresolved
org
PT Minera Nusa Drillindo
p.1 ×3
unresolved
org
PT MND
p.1 ×3
unresolved
org
PT Geoservices. Assessment
p.2
unresolved
org
PT AMNT NW. AMMAN
p.4
unresolved
org
PT AMNT BekolarCamp
p.6
Extraction attempts how the parser did, and what it refused
Nothing structured was extracted from this document — the attempts below say why.
No extraction attempted yet.