Exploration Report - Guarter 12024

Introduction

During the period 1 January 2024 to 31! March 2024 (O1 2024), PT Amman Mineral Nusa
Tenggara (PT AMNT), a subsidiary of PT Amman Mineral Internasional (PT AMI), carried out
exploration activities on IUPK Blocks I, Il and III, located in Sumbawa, Indonesia (Figure 1).
There was no field exploration within Block IV, Lampui.

Total exploration expenditure for A1 2024 was approximately USD $ 6.38 M.

NU me
Lombok » LN
5G Tano Port
Mataram Pre Tana For Sumbawa
yet omar po Lombok Int'1
# Airport "Taliwang
Ka g tu, - Io wu
ini Le henete poni vi Uu
| Lunyuk
»s »
T—
x
AN 3 1, N ' '
Zola » INDONESIA en
Sumbawa AMNT Asset Jakarta. 53 :
CJ ver pt AmnT @ Batu Hijau Mine Operation . aa ar
Project Area — @ Elang Cu-Au Project

Figure 1. PT AMNT IUPK blocks, Sumbawa, Indonesia.
Batu Hijau Block |

Expenditure:
e In pit resource drilling program costs, including core sample assay costs, amounted
to approximately USD $ 3.18 M.

amman.co.id

Work areas:
e Batu Hijau Cu-Au mine.

Exploration parties:
# Manager - AMNT Mine Technical Service (MTS).
e Drilling contractor - PT Minera Nusa Drillindo (PT MND).
e Assay laboratory - Intertek Utama Service (ITS).

PT AMMAN MINERAL INTERNASIONAL TBK
MENARA KARYA 6TH LEVEL, JALAN H.R. RASUNA SAID
BLOK X-5 KAV. 1-2 JAKARTA, INDONESIA 12950 T 4622157994600 F. 462 215296 4136 1
Page 2 OCR 0.846
AMMAN ANN

#  Umpire assay laboratory - PT Geoservices.

Assessment methods:
# Diamond coring (12 drill rigs).

Objectives:

e The aim of the on-going drill program is to improve the confidence classifications
of resources below the Batu Hijau Phase-8 pit design.

Exploration Results:
» 30 drill holes, completed or in progress, totaling 14,561.6 m (Figure 2).
e Core samples submitted to the assay lab amounted to 4,501.

Forward Plan:
» The resource drilling program (12 rigs) will continue in G2 2024.

NNW

MMAN

Pj
&
Ss
&
S
2
“5

amman.co.id

@ In Progress Drilling A1-2024
@ Completed Drilling A1-2024
Phase 8 Boundary 7

Figure 2. Batu Hijau Block I @1 2024 - In Pit Drill Collar Locations.

PT AMMAN MINERAL INTERNASIONAL TBK
MENARA KARYA 6TH LEVEL, JALAN H.R. RASUNA SAID
BLOK X-5 KAV. 1-2 JAKARTA, INDONESIA 12950 T 4622157994600 F. 462 215296 4136 2
Page 3 OCR 0.877
AMMAN ANN

Elang Block II

Expenditure:
e Exploration activities included drilling and geological mapping. Costs were circa
USD $ 2.61M.

Work Areas:
e Elang Cu-Au Project
e Alma Cu-Au Project
» Sebu East Project.

Exploration Parties:
» Manager - AMNT Exploration.
e Drilling contractor - PT Minera Nusa Drillindo (PT MND).
e  Assay Laboratory (drill core, rock) - Intertek Utama Service (ITS).

Assessment Methods:
e Diamond drilling (3 rigs).
»  Geological mapping (including rock sampling).
e Alteration analyses using an ASD Terra Search 4 Mineral Spectrometer.

Objectives:

» Resource development drilling continued at the Elang Cu-Au deposit (Figure 3). The
purpose of this infill program was to explore information gaps, improve the
geological model and to increase the confidence level of resource classifications.
Drilling in progress at Elang South is testing the southern and depth limits of the
Cu-Au resource block model.

e Exploration drilling at Alma tested for potential Cu-Au porphyry mineralization
beneath a lithocap (Figure 3). Detailed geological mapping was also undertaken.

e Detailed geological mapping at Sebu East, over a significant Induced Polarisation
(IP) conductivity and resistivity anomaly (Figure 3).

Exploration Results:
» Elang Block diamond drilling (11 holes for 4,893.6 m):
o Elang Cu-Au resource infill & exploration - & holes, completed or in
progress, totaling 3,021.8 m.
o Alma Cu-Au exploration - 5 holes, completed or in progress, amounting to
1,871.8 m.
# Core samples submitted to the assay lab amounted to 1,655.
e Geological mapping program:
o Sebu East -10 rock samples were submitted to the lab.

Forward Plan:
» Elang resource definition diamond drilling (2 rigs) will continue in @2 2024.
# Alma exploration diamond drilling (1 rig) will finish in A2 2024.
e Sebu East exploration drilling (1 rig), over a porphyry Cu-Au target, will start in G2
2024.

amman.co.id

PT AMMAN MINERAL INTERNASIONAL TBK
MENARA KARYA 6TH LEVEL, JALAN H.R. RASUNA SAID
BLOK X-5 KAV. 1-2 JAKARTA, INDONESIA 12950 T 4622157994600 F. 462 215296 4136 3
Page 4 OCR 0.797
AMMAN

NNNN

5 UPK PT AMNT

NW.

AMMAN

amman.co.id

dis
|
1Km:

9008000 N

In Progress Drilling @1-2024
Completed Drilling A1-2024
Previous Holes

N P22ZA Mapping Area @1-2024

538000 FE:

549000 EN / 542000 E

. 544000

9010000 N 9012000 N 9014000 N

9006000 N

9004000 N

Figure 3. Elang Block II A1 2024 - Exploration Locations.

PT AMMAN MINERAL INTERNASIONAL TBK
MENARA KARYA 6TH LEVEL, JALAN H.R. RASUNA SAID
BLOK X-5 KAV. 1-2 JAKARTA, INDONESIA 12950

T 4622157994600 F. 462 215296 4136
Page 5 OCR 0.874
AMMAN ANN

Rinti Block III

Expenditure:
e Exploration drilling program and geological mapping costs, including core sample
and rock assay costs, amounted to approximately USD $ 0.59 M

Work Areas:
e  Rinti Cu-Au Project.

Exploration Parties:
» Manager - AMNT Exploration.
» Drilling contractor - PT Minera Nusa Drillindo (PT MND).
e Assay Laboratory (rocks) - Intertek Utama Service (ITS).

Assessment Method:
# Diamond drilling (1 rig).
»  Geological mapping (including rock sampling).

Objectives:
» The aim of the current exploration drilling program is to test for potential Cu-Au
porphyry mineralization beneath a lithocap (Figure 4).
e Detailed geological mapping was carried out over a significant Cu-Au soil anomaly
in the SW portion of the Rinti Block (Figure 4).

Exploration Results:
e  Rinti diamond drilling - 2 holes, completed or in progress, amounted to1,374.0 m.
e Core samples submitted to the assay lab amounted to 646.
e Geological mapping program - 66 rock samples were submitted to the lab.

Forward Plan:
e The exploration drilling program (1 rig) will continue in A2 2024.

amman.co.id

PT AMMAN MINERAL INTERNASIONAL TBK
MENARA KARYA 6TH LEVEL, JALAN H.R. RASUNA SAID
BLOK X-5 KAV. 1-2 JAKARTA, INDONESIA 12950 T 4622157994600 F. 462 215296 4136 5
Page 6 OCR 0.736
AMMAN ANN

562000 564000 E 566000 E

NNW
AMMAN IUPK PT AMNT
BekolarCamp 53 z
L o a— Na 8-
. 8
z
8
|. 2
8
K.Beringin Camp
2 2
IMEI Ouariz Vein (ES aargillic Aiteration N g
PPP vuggy Guartz (PE Aavance Argillic Alteration 8)
| Hydrothermal Breccia DA | Phyllic Alteration 8
. . ai
ng Silica Alteration 500m
@ In Progress Drilling @1-2024
2  Completed Drilling A1-2024
2 “ Previous Holes
g (117//Mapping Area @1-2024
HJ (Cc MoisTEM Resistivity at depth 100m
E
«

Figure 4. Rinti Block TT @1 2024 - Exploration Tocations.

Lampui Block IV

No field work or costs incurred in @1 2024. An exploration drilling program (1 rig), over a
Cu-Au target developed last year, is due to commence in A2 2024.

PT AMMAN MINERAL INTERNASIONAL TBK
MENARA KARYA 6TH LEVEL, JALAN H.R. RASUNA SAID
BLOK X-5 KAV. 1-2 JAKARTA, INDONESIA 12950 T 4622157994600 F. 462 215296 4136 6

File

File Open PDF
Source IDX
Size2.17 MB
Published10 Apr 2024
Pages6
Characters6,961
Text sourceOCR
OCR confidence0.813

Names mentioned 10 people and organisations named in the text · linked when the evidence is strong

linked org AMMAN MINERAL INTERNASIONAL TBK p.1 ×19
unresolved org PT Amman Mineral Nusa Tenggara p.1
unresolved org PT AMNT p.1
unresolved org PT AMI p.1
unresolved org PT AMNT IUPK p.1
unresolved org PT Minera Nusa Drillindo p.1 ×3
unresolved org PT MND p.1 ×3
unresolved org PT Geoservices. Assessment p.2
unresolved org PT AMNT NW. AMMAN p.4
unresolved org PT AMNT BekolarCamp p.6

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result