Skip to content
Back to announcement

20240408_BOLD_Laporan Informasi dan Fakta Material_31625989.pdf

Other Text extracted BOLD

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 4

Page 1
Go To English Page

 Nomor Surat                           BUMA/DIR/2024/IV/0368

 Nama Perusahaan                       PT Bukit Makmur Mandiri Utama

 Kode Emiten                           BOLD

 Lampiran                              1
                                       Selesainya final settlement atas Penawaran Tender atas Surat Utang 2026
 Perihal


Dengan ini kami untuk dan atas nama perusahaan menyampaikan Laporan Informasi atau Fakta Material sebagai
berikut:

 Nama Emiten atau Perusahaan Publik            PT Bukit Makmur Mandiri Utama

 Bidang Usaha                                  Jasa pertambangan umum



 Telepon                                       0216613636

 Faksimili

 Alamat Surat Elektronik (email)               corpsec@bukitmakmur.com


 Tanggal Kejadian                              05 April 2024
 Jenis Informasi atau Fakta Material           Selesainya final settlement atas Penawaran Tender atas Surat
                                               Utang 2026


 Uraian Informasi atau Fakta Material          Mohon merujuk pada Lampiran




 Dampak kejadian, informasi atau fakta         Mohon merujuk pada Lampiran
 material tersebut terhadap kegiatan
 operasional, hukum, kondisi keuangan,
 atau kelangsungan usaha Emiten atau
 Perusahaan Publik



 Demikian untuk diketahui.


 Hormat Kami,
 PT Bukit Makmur Mandiri Utama




 Samuel Sinaga

 Deputy Director




 PT Bukit Makmur Mandiri Utama
 South Quarter Tower A, Penthouse Floor, Jl. R. A. Kartini Kav. 8, Cilandak Barat,
 Telepon : 0216613636, Fax : , https://deltadunia.com/id/tentang-buma/



 Nama Pengirim                         Samuel Sinaga
Page 2
Jabatan                           Deputy Director
Tanggal dan Waktu                 08-04-2024 21:08

Lampiran                         1. Executed - KI Material (BUMA Settlement).pdf


  Dokumen ini merupakan dokumen resmi PT Bukit Makmur Mandiri Utama yang tidak memerlukan tanda tangan
karena dihasilkan secara elektronik oleh sistem pelaporan elektronik. PT Bukit Makmur Mandiri Utama bertanggung
                          jawab penuh atas informasi yang tertera didalam dokumen ini.
Page 3
Go To Indonesian Page

 Letter / Announcement No.            BUMA/DIR/2024/IV/0368

 Issuer Name                          PT Bukit Makmur Mandiri Utama

 Issuer Code                          BOLD

 Attachment                           1

 Subject                              Completion of final settlement in relation to the Tender Offer of 2026 Notes


The company hereby announce the Material Information or Facts Report as follows

 Name of Issuer or Public Company              PT Bukit Makmur Mandiri Utama

 Business Activities                           Jasa pertambangan umum


 Telephone                                     0216613636

 Faximile

 Email Address                                 corpsec@bukitmakmur.com


 Date of Event                                 05 April 2024

                                               Completion of final settlement in relation to the Tender Offer of
 Type of Material Information or Facts         2026 Notes

 Description of Material Information or        Please refer to the Appendix
 Facts


 Impact of event, material information or      Please refer to the Appendix
 facts towards Issuers or Public
 Company’s operational activities, legal,
 financial condition, or going concern




Thus to be informed accordingly.


Respectfully,
PT Bukit Makmur Mandiri Utama




Samuel Sinaga

Deputy Director




PT Bukit Makmur Mandiri Utama
South Quarter Tower A, Penthouse Floor, Jl. R. A. Kartini Kav. 8, Cilandak Barat,
Phone : 0216613636, Fax : , https://deltadunia.com/id/tentang-buma/



Sender Name                          Samuel Sinaga

Function                             Deputy Director

Date and Time                        08-04-2024 21:08
Page 4
Attachment                         1. Executed - KI Material (BUMA Settlement).pdf


     This is an official document of PT Bukit Makmur Mandiri Utama that does not require a signature as it was
 generated electronically by the electronic reporting system. PT Bukit Makmur Mandiri Utama is fully responsible for
                                    the information contained within this document.

File

File Open PDF
Source IDX
Size0.01 MB
Published8 Apr 2024
Pages4
Characters4,238
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 6 people and organisations named in the text · linked when the evidence is strong

linked org PT Bukit Makmur Mandiri Utama · Nama Perusahaan p.1 ×18
unresolved org PT Bukit Makmur Mandiri Utama Bidang p.1
unresolved org PT Bukit Makmur Mandiri Utama Samuel Sinaga Deputy p.1 ×2
unresolved org PT Bukit Makmur Mandiri Utama South Quarter Tower p.1 ×2
unresolved person Samuel Sinaga · Nama Pengirim p.1 ×2
unresolved org PT Bukit Makmur Mandiri Utama Business Activities p.3

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result