PT Bumi Resources Minerals Tbk.
Bakrie Tower, 6 & 10th Floor
Komplek Rasuna Epicentrum
Jl. H.R. Rasuna Said, Kuningan
Jakarta Selatan 12940
Indonesia
T +62 21 5794 5698
F +62 21 5794 5687
www.bumiresourcesminerals.com
LAPORAN TENTANG AKTIVITAS EKSPLORASI
OLEH ANAK PERUSAHAAN PT BUMI RESOURCES MINERALS TBK.
(REPORT ON EXPLORATION ACTIVITIES
BY SUBSIDIARIES OF PT BUMI RESOURCES MINERALS TBK.)
I. PT Citra Palu Minerals
Nama Perusahaan : PT Citra Palu Minerals (“PT CPM”)
(Name of Company)
Tahap Kegiatan KK : Operasi Produksi (Production Operation)
(Phase of Activity of Contract of Work)
Laporan Eksplorasi Periode : Januari – Maret (January - March) 2024
(Period of Exploration Report)
A. Daerah Eksplorasi Exploration Areas
1. Blok I, Sulawesi Tengah (Operasi Produksi) 1. Block I, Central Sulawesi (Production
2. Blok II, Sulawesi Selatan (Eksplorasi) Operation)
3. Blok IV, Sulawesi Tengah (Eksplorasi) 2. Block II, South Sulawesi (Exploration)
4. Blok V, Sulawesi Tengah (Eksplorasi) 3. Block IV, Central Sulawesi (Exploration)
5. Blok VI, Sulawesi Tengah (Eksplorasi) 4. Block V, Central Sulawesi (Exploration)
5. Block VI, Central Sulawesi (Exploration)
B. Biaya Eksplorasi Exploration Cost
1.388.730,63 Dolar AS USD1,388,730.63
C. Bentuk Kegiatan Eksplorasi Form of Exploration Activities
1. Melanjutkan kegiatan pengeboran sumber 1. Continued resource drilling program at the
daya di Prospek River Reef, Blok I Poboya, River Reef Prospect, Block I Poboya, with a
dengan total kedalaman saat ini 52.403,80m. current total depth of 52,403.80m.
2. Melanjutkan kegiatan pengeboran sumber 2. Continue resource drilling program in the
daya di area Watu Putih, Blok I Poboya, Watu Putih area, Block I Poboya, with a
dengan total kedalaman saat ini 12.095,75m. current total depth of 12,095.75m.
3. Melanjutkan kegiatan pengeboran eksplorasi 3. Continued exploration drilling program in the
di area Prospek Hill Reef 1, Blok I Poboya, Hill Reef 1 Prospect area, Block I Poboya, with
dengan total kedalaman saat ini 14.724,65m. a current total depth of 14,724.65m.
4. Melanjutkan kegiatan pemetaan geologi di 4. Continued geological mapping activities in
Area Malomba, Ogowele, Anggasan, dan Malomba, Ogowele, Anggasan and Taanes
Taanes, Blok IV, dengan total 419 sampel Areas, Block IV, with a total of 419 rock
batuan dan 1125 sampel tanah. samples and 1125 soil samples.
5. Melakukan pengiriman sampel inti bor untuk 5. Carried out geochemical analysis from drill
analisis geokimia (Au, Ag, Cu, Pb, Zn, As, Sb, core samples (Au, Ag, Cu, Pb, Zn, As, Sb, Mo,
Mo, Hg dan kombinasi Au + ICP OES multi Hg and combination of Au + ICP OES multi
elemen) dan analisi AAT (Air Asam Tambang) elements) and AAT (Acid Mine Drainage)
Page 2
ke Laboratorium PT Geoservices. analysis by PT Geoservices Laboratory.
6. Melakukan pengiriman sampel inti bor untuk 6. Carried out geotechnical testwork for drill core
uji geoteknik ke Laboratorium Geomekanika samples by Geomechanics and Mine
dan Peralatan Tambang, Institut Teknologi Equipment Laboratory, Bandung Institute of
Bandung (ITB). Technology (ITB).
7. Melakukan pengiriman sampel inti bor domain 7. Carried out metallurgical test work by PT Indo
untuk uji metalurgi ke Laboratorium PT Indo Mineral Research Laboratory for drill core
Mineral Research. samples based on mineralization domain.
D. Pihak-Pihak yang Terlibat Involved Parties
1. Laboratorium PT CPM 1. Internal PT CPM Laboratory
2. PT Sumagud Sapta Sinar 2. PT Sumagud Sapta Sinar
3. Laboratorium PT Geoservices 3. PT Geoservices Laboratory
4. Bureau Varitas – PT IOL Indonesia 4. Bureau Varitas – PT IOL Indonesia
5. PT Pos Indonesia 5. PT Pos Indonesia
6. PT Intertek Utama Service 6. PT Intertek Utama Service
7. Laboratorium Geomekanika dan Peralatan 7. ITB Laboratory of Geomechanics and Mine
Tambang ITB Equipment
8. PT Indo Mineral Research 8. PT Indo Mineral Research
E. Metode Pengujian dan Pemilihan Areal Testing Method and Selection Area
1. AAS 1. AAS
2. Specific Gravity 2. Specific Gravity
3. Fire Assay 3. Fire Assay
4. Aqua Regia Digest 4. Aqua Regia Digest
5. Hg Analisis 5. Hg Analysis
6. ICP OES 42 unsur 6. ICP OES 42 elements
7. Natural density, dry density, saturated 7. Natural density, dry density, saturated density,
density, Brazillian test, direct shear, ultrasonic Brazillian test, direct shear, ultrasonic velocity,
velocity, UCS UCS
8. Analisis Air Asam Tambang 8. ARD Test
9. Uji Physical Properties (PP), Uji Uniaxial 9. Physical Properties Test (PP), Uniaxial
Compressive Strength (UCS), Uji Triaxial Compressive Strength (UCS) Test, Triaxial Test
10. Pengujian kominusi (Abrasion Index, BRMi, 10. Comminution Test (Abrasion Index BRMi,
SMC, JKBMM); Head Grade; Sianidasi; SMC, JKBMM); Head Grade; Sianidasi;
Column Test Column Test
F. Kemajuan Eksplorasi Terhadap Kegiatan Triwulan Exploration Progress toward the Preceding
Sebelumnya Quarter Activities
1. Pengeboran sumber daya di Prospek River 1. Resources drilling program in Poboya River
Reef dilakukan dengan menggunakan 3 rig. Reef Prospect Block I was conducted using 3
Total 241 titik bor, termasuk 3 titik bor rigs. A Total of 241 drill holes, included 3
hidrogeologi dan 5 titik bor geotek, dengan hydrogeology holes and 5 geotech holes, with
total kedalaman 52.403,80m sampai akhir total depth of 52,403.80m has been reached
Maret 2024. Terdapat penambahan 8 titik by the end of March 2024. There are 8
bor dengan jumlah kedalaman 2.453,90m additional drill holes with total depth of
Page 3
dari periode sebelumnya. 2,453.90m from previous period.
2. Pengeboran sumberdaya di Prospek Watu 2. Resources drilling program in Watu Putih
Putih dilanjutkan dengan menggunakan 1 Prospect was continued using 1 rig. A total of
rig. Total 35 titik bor dengan total 35 drill holes with total depth of 12,095.75m
kedalaman 12.095,75m sampai akhir Maret has been reached by the end of March 2024.
2024. Terdapat penambahan 6 titik bor There are additional 6 drill holes with total
dengan jumlah kedalaman 1.482,10m dari depth of 1,482.10m from previous period.
periode sebelumnya.
3. Pengeboran eksplorasi di Prospek Hill Reef 1 3. Exploration drilling program in Hill Reef 1
dilanjutkan dengan menggunakan 1 rig. Prospect was continued using 1 rig. A total of
Total 157 titik bor dengan total kedalaman 157 drill holes with total depth of
12.832,00m sampai akhir Maret 2024. 12,832.00m has been reached by the end of
Terdapat penambahan 6 titik bor dengan March 2024. There are additional 6 drill holes
jumlah kedalaman 374,60m dari periode with total depth of 374.60m from previous
sebelumnya period
4. Penambahan jumlah sampel sebanyak 1.844 4. Additional 1,844 drill core samples from River
sampel hasil pengeboran Prospek River Reef Reef Prospect of Block I Poboya drilling
Blok I Poboya yang dikirim ke Laboratorium program have been sent to PT Geoservices
PT Geoservices untuk dianalisis geokimia Laboratory to be analyzed (Au, Ag, u, Pb, Zn,
(Au, Ag, Cu, Pb, Zn, As, Sb, Mo, Hg dan As, Sb, Mo, Hg and combination Au + ICP 42
kombinasi Au + ICP 42 unsur), 14 sampel elements), 14 samples for ARD (Acid Rock
untuk analisis AAT (Air Asam Tambang) Drainage).
5. Penambahan jumlah sampel sebanyak 894 5. Additional 894 drill core samples from Watu
sampel hasil pengeboran Prospek Watu Putih Putih Prospect of Block I Poboya drilling
Blok I Poboya yang dikirim ke Laboratorium program have been sent to PT Geoservices
PT Geoservices untuk dianalisis geokimia Laboratory to be analyzed (Au, Ag, u, Pb, Zn,
(Au, Ag, Cu, Pb, Zn, As, Sb, Mo, Hg dan As, Sb, Mo, Hg and combination Au + ICP 42
kombinasi Au + ICP 42 unsur dan 3 sampel elements) and 3 sample for ARD (Acid Rock
untuk analisis air asam tambang. Drainage).
6. Penambahan jumlah sampel sebanyak 133 6. Additional 133 drill core samples from Hill
sampel hasil pengeboran Prospek Hill Reef 1 Reef 1 Prospect of Block I Poboya drilling
Blok I Poboya yang dikirim ke Laboratorium program have been sent to PT Geoservices
PT Geoservices untuk dianalisis geokimia Laboratory to be analyzed (Au, Ag, u, Pb, Zn,
(Au, Ag, Cu, Pb, Zn, As, Sb, Mo, Hg dan As, Sb, Mo, Hg and combination Au + ICP 42
kombinasi Au + ICP 42 unsur dan 17 sampel elements) and 17 sample for ARD (Acid Rock
untuk analisis air asam tambang. Drainage).
7. Total penambahan sebanyak 196 sampel 7. Total additional 196 rock samples and 370
batuan dan 370 sampel tanah berasal dari soil samples collected from geological
kegiatan pemetaan geologi di Area Taanes, mapping activity at Taanes, Ogowele and
Ogowele dan Janja, Blok IV. Janja Areas, Block IV.
G. Rencana Selanjutnya Next Plan
1. Melanjutkan kegiatan pengeboran di Prospek 1. Continue resources drilling program in River
River Reef Blok I Poboya dengan tujuan Reef Prospect of Block I Poboya Prospect with
untuk menambah sumber daya di Prospek objectives to increase resources in River Reef
River Reef. Prospect.
Page 4
2. Melanjutkan kegiatan pengeboran di Prospek 2. Continue resources drilling program in
Watu Putih Blok I Poboya dengan tujuan Watuputih Prospect of Block I Poboya
untuk meningkatkan sumber daya dan Prospect with the objective of resources
cadangan di Prospek Watuputih. definition in Watuputih Prospect.
3. Melanjutkan kegiatan pengeboran eksplorasi 3. Continue exploration drilling program in Hill
di Prospek Hill Reef 1 Blok I Poboya dengan Reef 1 Prospect of Block I Poboya Prospect
tujuan untuk mengetahui potensi bijih kadar with the objective is to test the potential of
rendah pada kedalaman dangkal. low grade ore at shallow level.
4. Melanjutkan pemetaan geologi detail di Area 4. Continue geological detailed mapping at
Taanes and Tinabogan Blok IV. Taanes and Tinabogan Area, Block IV.
H. Hambatan Eksplorasi Barriers to Exploration
1. Kegiatan penambangan tanpa izin (PETI) 1. Illegal mining activities by local community.
oleh masyarakat sekitar.
2. Pembebasan lahan. 2. Land acquisition.
I. Perizinan/ Persetujuan Baru Yang Diperoleh New Permits/Approvals Acquired
1. Surat Direktorat Jenderal Mineral dan 1. Directorate General of Mineral and Coal
Batubara No. B-54/MB.04/DJB.M/2024 Letter No. B-54/MB.04/DJB.M/2024 regarding
perihal Persetujuan Akhir Revisi Laporan Studi Final Approval of Revised Feasibility Study
Kelayakan PT Citra Palu Minerals pada Report of PT Citra Palu Minerals dated on
tanggal 10 Januari 2024. January 10th, 2024.
2. Izin Pengusahaan Air Tanah dari Kementerian 2. Groundwater Business Permit from the
Investasi/ BKPM tanggal 18 Januari 2024 Ministry of Investment/BKPM dated January
18 2024
3. SLO Pengelolaan Limbah B3 PT CPM Stage 1 3. PT CPM Stage 1 B3 Waste Management SLO
dari Kementerian LHK tanggal 29 Februari from the Ministry of Environment and
2024 Forestry on February 29 2024
Page 5
II. PT. Dairi Prima Mineral
Nama Perusahaan : PT. Dairi Prima Mineral
(Name of Company)
Tahap Kegiatan KK : Operasi Produksi
(Phase of Activity of Contract of
Work)
Laporan Eksplorasi Bulan : Januari - Maret (January – March) 2024
(Monthly Exploration Report)
A. Daerah Eksplorasi Exploration Areas
Kegiatan eksplorasi pada Prospek Anjing Hitam Filed exploration activities on Anjing Hitam
sudah selesai dilakukan dan saat ini prospek Prospect has already been completed. The
tersebut memasuki tahap Operasi Produksi. prospect currently is in Operation and
Selain Prospek Anjing Hitam, di dalam wilayah Production stage.
Kontrak Karya DPM masih terdapat prospek- Beside Anjing Hitam Prospect, there are some
prospek lainnya dengan tahap kegiatan yang other prospect areas within DPM Contract of
berbeda-beda dari eksplorasi regional hingga Work tenement. The prospects work progress
pengeboran deliniasi sumberdaya. are in different stages, range from regional
Salah satu prospek yang paling maju exploration to delineation resource drilling.
pengerjaannya adalah Prospek Lae Jehe yang Lae Jehe Prospect is the most advantage
terletak sekitar 200 meter di sebelah baratlaut exploration activities. This prospect is situated
Prospek Anjing Hitam. Prospek ini sudah approximately 200 meters toward northwest
memasuki tahap pengeboran deliniasi from Anjing Hitam Prospect. This prospect
sumberdaya dan masih akan dikembangkan work stage is in resource delineation drilling
hingga didapatkan sumberdaya mineral dengan and will be developed to get final mineral
klasifikasi terukur dan tertunjuk yang lebih resource value with dominant measured and
dominan. indicated mineral resources classification.
B. Biaya Eksplorasi Exploration Costs
28.358,19 Dollar AS USD 28,358.19
C. Bentuk Kegiatan Eksplorasi Form of Exploration Activities
Selama Bulan Januari hingga Maret 2024 tidak On January to March 2024 nothing
ada kegiatan eksplorasi. exploration activity.
D. Pihak-Pihak yang Terlibat Parties Involved
- -
E. Metode Pengujian dan Pemilihan Areal Testing Method and Selection of Area
- -
F. Kemajuan Eksplorasi Terhadap Bulan sebelumnya Exploration Progress relative to Preceding
Month’s Activities
- -
Page 6
G. Rencana Pengeboran Selanjutnya Next Drilling Plan
Penambahan titik bor di Prospek Lae Jehe dan Infill drilling in Lae Jehe and Basecamp
Basecamp. Prospect.
H. Hambatan Eksplorasi Barriers to Exploration
- -
I. Perizinan / Persetujuan Baru Yang Diperoleh New Permits / Approvals Acquired
• Persetujuan Addendum Amdal tanggal 11 • Letter of Addendum AMDAL Approval 11
Agustus 2022 August 2022
• Persetujuan RKAB No.T- • DPM 2022 work plan approval No. No.T-
660/MB.04/DJB.M/2022 tanggal 11 Pebruari 660/MB.04/DJB.M/2022,11 February 2022.
2022.
• DPM telah mendapatkan Persetujuan Tekno- • Letter from Direktorat Jenderal Mineral dan
Ekonomi Dokumen Studi Kelayakan Kontrak Batubara No. 2150/30/DBM/2015 awarding
Karya PT Dairi Prima Mineral berdasarkan Techno-Economic Approval of Feasibility
Surat Persetujuan No. 2150/30/DBM/2015. Study Document Contract of Work of PT
DPM has already been received.
• Tahap kegiatan PT DPM disesuaikan menjadi • PT DPM work activity has already been
Tahap Operasi Produksi berdasarkan Surat adjusted became Operation Production
Keputusan Menteri Energi dan Sumber Daya Phase based on Decree of Energy and
Mineral No. 456.K/30/DJB/201t. Mineral Resources Minister No.
456.K/30/DJB/2017.
Page 7
III. Gorontalo Minerals
Nama Perusahaan : PT Gorontalo Minerals (“PT GM”)
(Name of Company)
Tahap Kegiatan KK : Operasi Produksi ( Block Production Operation)
(Phase of Activity of Contract of Work)
Laporan Eksplorasi Bulan : Januari - Maret 2024 (January - March 2024)
(Monthly Exploration Report)
A. Daerah Eksplorasi Exploration Areas
1. Prospek Sungai Mak, Blok I (Tombulilato), 1. Sungai Mak Prospect, Block I (Tombulilato),
Gorontalo Gorontalo
2. Prospek Motomboto North, Blok I 2. Motomboto North Prospect, Block I
(Tombulilato), Gorontalo (Tombulilato), Gorontalo
3. Prospek Motomboto East, Blok I (Tombulilato), 3. Motomboto East Prospect, I (Tombulilato),
Gorontalo Gorontalo
4. Prospek Kayubulan, Blok I (Tombulilato), 4. Kayubulan Prospect, Block I (Tombulilato),
Gorontalo Gorontalo
5. Prospek Cabang Kiri East, Blok I (Tombulilato), 5. Cabang Kiri East Prospect, Block I
Gorontalo (Tombulilato), Gorontalo
B. Biaya Eksplorasi Exploration Costs
193,660.97 Dolar AS USD193,660.97
C. Bentuk Kegiatan Eksplorasi Form of Exploration Activities
1. Total sampel tanah sebanyak 366 sampel 1. The total 366 soil samples from Sungai
dari Prospek Sungai Mak telah dikirimkan ke Mak Prospect have been sent to PT
Laboratorium PT Geoservices untuk analisis Geoservices Laboratory for geochemical
geokimia. analysis.
2. Melanjutkan pengujian Geoteknik batch II 2. Continuing the geotechnical testing of
sebanyak 102 sampel batuan dari Prospek batch II, comprising 102 rock samples
Motomboto East, Blok I Tombulilato ke from the Motomboto East Prospect, Block
Laboratorium Geomekanika ITB. I Tombulilato, to the Geomechanics
Laboratory at ITB.
3. Melanjutkan pengujian metalurgi column 3. Continuing the metallurgical column test
test untuk Domain Oxide dari Prospek for the Oxide Domain from the
Motomboto North, Prospek Motomboto Motomboto North Prospect, Motomboto
East, dan Prospek Sungai Mak di East Prospect, and Sungai Mak Prospect at
Laboratorium Geoservices dibawah the Geoservices Laboratory under the
pengawasan Metso-Autotec. supervision of Metso-Autotec.
4. Melakukan pemetaan geologi dan 4. Conducting geological mapping and
pengambilan sampel batuan permukaan di collecting surface rock samples in the
area Prospek Cabang Kiri East. Cabang Kiri East Prospect area.
5. Total sampel batuan permukaan sebanyak 5. A total of 1,010 surface rock samples from
1.010 sampel dari Prospek Kayubulan, the Kayubulan, Sungai Mak, Motomboto,
Sungai Mak, Motomboto, dan Cabang Kiri and Cabang Kiri prospects have been sent
Page 8
telah dikirim ke Laboratorium PT Geoservices to PT Geoservices Laboratory for
untuk analisis geokimia. geochemical analysis.
6. Melakukan kegiatan tapping compass dan 6. Conducting tapping compass activities and
ridge spur soil sampling pada Prospek ridge-spur soil sampling in the Cabang Kiri
Cabang Kiri, Blok I Tombulilato. Prospect, Block I Tombulilato.
7. Melanjutkan estimasi sumber daya dan 7. Continuing resource and reserve
cadangan untuk Prospek Motomboto East estimation for the Motomboto East and
dan Motomboto North, serta domain oxide Motomboto North Prospects, as well as
dari Prospek Sungai Mak. the oxide domain of the Sungai Mak
Prospect.
D. Pihak-Pihak yang Terlibat Parties Involved
1. Laboratorium PT Geoservices 1. PT Geoservices’ Laboratory
2. Laboratorium Geomekanika ITB 2. ITB Geomechanics’ Laboratory
3. Laboratorium Teknik Lingkungan ITENAS 3. ITENAS Environmental Technic Laboratory
4. PT Adiprotek Envirodunia 4. PT Adiprotek Envirodunia
5. PT ITS Tekno Sains 5. PT ITS Tekno Sains
6. PT LAPI ITB 6. PT LAPI ITB
7. Indo Mineral Research Laboratorium 7. Indo Mineral Research’s Laboratorium
E. Metode Pengujian dan Pemilihan Areal Testing Method and Selection of Area
- -
F. Kemajuan Eksplorasi Terhadap Kegiatan Triwulan Exploration Progress toward Previous
Sebelumnya Quarter’s Activities
1. Menyelesaikan analisis 19 sampel petrografi 1. Completing the analysis of 19 petrographic
dan 18 sampel mineragrafi dari Prospek samples and 18 mineralogical samples
Motomboto North ke LAPI-ITB Bandung. from the Motomboto North Prospect at
LAPI-ITB Bandung.
2. Menyelesaikan pengeboran di Prospek 2. Completing drilling at the Motomboto East
Motomboto East, Blok I Tombulilato Prospect, Block I Tombulilato, with a total
sebanyak 11.073 conto inti bor telah of 11,073 core samples received the
diterima hasil Analisis Geokimia dari PT Geochemical Analysis results from PT
Geoservices. Geoservices.
3. Menyelesaikan pemetaan geologi dan 3. Completing geological mapping and rock
pengambilan sampel batuan permukaan di sampling around the Sungai Mak and
sekitar area Prospek Sungai Mak dan Kayubulan Prospects areas.
Prospek Kayubulan.
G. Rencana Selanjutnya Next Plan
1. Melakukan kegiatan pemetaan geologi dan 1. Conducting geological mapping activities
pengambilan sampel batuan permukaan di and rock surface sample collection in the
area Prospek Cabang Kiri (North). Cabang Kiri (North) Prospect area.
2. Melakukan kegiatan tapping compass dan 2. Conducting tapping compass and ridge
ridge spur soil sampling pada Prospek spur soil sampling activities in the Cabang
Cabang Kiri (North). Kiri (North) Prospect.
3. Melanjutkan estimasi sumberdaya dan 3. Continuing resource and reserve
Page 9
cadangan untuk Prospek Motomboto East estimation for the Motomboto East and
dan Motomboto North, serta domain oxide Motomboto North prospects, as well as
dari Prospek Sungai Mak. the oxide domain of the Sungai Mak
Prospect.
4. Melakukan persiapan untuk kegiatan 4. Preparing for drilling activities for the
pengeboran copper project di area Prospek copper project in the Cabang Kiri Prospect
Cabang Kiri. area.
H. Hambatan Eksplorasi Barriers to Exploration
1. Adanya aktifitas Penambangan Tanpa Izin 1. An Illegal Mining Activity (PETI) in the
(PETI) di area rencana pengeboran Prospek drilling planned area of the Motomboto
Motomboto. Prospect.
2. Munculnya aktifitas Penambangan Tanpa 2. New Illegal Mining Activity (PETI) in the
Izin (PETI) baru di area sepanjang jalur opening area alongside the pioneering
bukaan jalan perintis. road construction.
I. Perizinan/Persetujuan Baru Yang Diperoleh New Permits/Approvals Acquired
- -
Page 10
IV. PT Linge Mineral Resources
Nama Perusahaan : PT Linge Mineral Resources (“PT LMR”)
(Name of Company)
Tahap Kegiatan IUP : Eksplorasi (Exploration)
(Phase of Activity of Mining Permit)
Laporan Eksplorasi Periode : Januari – Maret (January – March) 2024
(Period of Exploration Report)
A. Daerah Eksplorasi Exploration Areas
1. Prospek Bulan (Proyek Abong) 1. Bulan Prospect (Abong Project)
2. Prospek Bintang 1 (Proyek Abong) 2. Bintang 1 Prospect (Abong Project)
3. Prospek Bintang 2 (Proyek Abong) 3. Bintang 2 Prospect (Abong Project)
B. Biaya Eksplorasi Exploration Costs
235,095 Dolar AS USD 235,095
C. Bentuk Kegiatan Eksplorasi Form of Exploration Activities
1. Pada periode ini, PT LMR melanjutkan 1. In this period, PT LMR continued exploration
kegiatan eksplorasi di lapangan berupa survei activities in the field in the form of regional
regional geologi di luar Prospek Abong, yaitu geological surveys outside the Abong Prospect,
Pantan Nangka. namely Pantan Nangka.
2. Melanjutkan analisis geokimia 95 sampel 2. Continue geochemical analysis of 95 Stream
Stream Sediment di Laboratorium PT Intertek Sediment samples at the PT Intertek Laboratory
dan 196 sampel Rock Chip Regional di and 196 Regional Rock Chip samples at the PT
Laboratorium PT Geoservices. Geoservices Laboratory.
3. Pada periode ini, PT LMR melanjutkan 3. In this period, PT LMR continued further
kegiatan eksplorasi lanjutan atau follow up exploration activities or follow up work outside
work di luar Prospek Abong, yaitu East Bulan the Abong Prospect, namely East Bulan and
dan North Bintang, serta melakukan analisis North Bintang, as well as carrying out
geokimia di Laboratorium Geoservices. geochemical analysis at the Geoservices
Laboratory.
4. Melakukan interpretasi dan pemodelan 4. Carry out geological interpretation and modeling
geologi Prospek Abong (validasi bawah of the Abong Prospect (subsurface validation and
permukaan dan sebaran permukaan) untuk surface distribution) for GAP mineral analysis
keperluan GAP analisis mineral. purposes.
5. Pada periode ini, PT LMR melanjutkan proses 5. In this period, PT LMR continues the process of
penyelesaian studi AMDAL dan permohonan completing the AMDAL study and requesting
Persetujuan Teknis Pemenuhan Baku Mutu Technical Approval Fulfillment of Waste Water
Air Limbah dalam rangka Pembuangan Air Quality Standards in the framework of Waste
Limbah ke Badan Permukaan Air serta Water Disposal to Surface Water Bodies as well
permohonan Persetujuan Teknis Pengelolaan as requesting Technical Approval for B3 Waste
Limbah B3 kepada Kementerian Lingkungan Management to the Ministry of Environment and
Hidup dan Kehutanan. Forestry.
Page 11
D. Pihak-Pihak yang Terlibat Parties Involved
Laboratorium PT Geoservices PT Geoservices Laboratory
Laboratorium PT Interlek PT Interlek Laboratory
PT Bahtera Ratu Engineering PT Bahtera Ratu Engineering
E. Metode Pengujian dan Pemilihan Areal Testing Method and Selection of Area
AMDAL AMDAL
F. Kemajuan Eksplorasi Terhadap Kegiatan Bulan Exploration Progress toward Previous Month’s
Sebelumnya Activities
1. In this period, PT LMR has completed
1. Pada periode ini, PT LMR telah menyelesaikan
exploration activities in the field in the form of
kegiatan eksplorasi di lapangan berupa
Stream Sediment retrieval and regional
pengambilan Stream Sediment dan survei
geological surveys outside the Abong Prospect,
regional geologi di luar Prospek Abong, yaitu
namely Serule, Penarun, Simpil and Owaq.
Serule, Penarun, Simpil dan Owaq.
2. Pada bulan sebelumnya, PT LMR melanjutkan 2. In the previous month, PT LMR continued
kegiatan eksplorasi lanjutan atau follow up further exploration activities or follow up work
work di luar Prospek Abong, yaitu East Bulan outside the Abong Prospect, namely East Bulan
(Kapar) dan South Bulan, serta melakukan (Kapar) and South Bulan, as well as carrying out
analisis geokimia di Laboratorium Geoservices. geochemical analysis at the Geoservices
Laboratory.
3. Pada tanggal 21 Februari 2024, PT LMR telah 3. On February 21 2024, PT LMR received the
mendapatkan Berita Acara Rapat Tim Teknis Minutes of the Technical Team Meeting of the
Komisi Penilai AMDAL Pusat Lanjutan Terbatas Limited Advanced Center AMDAL Assessment
Pembahasan Formulir KA-ANDAL Rencana Commission Discussion of the KA-ANDAL Form
Kegiatan Penambangan dan Pengolahan Bijih for the Mining and Processing Activity Plan for
Emas dan mineral pengikutnya di Proyek Gold Ore and accompanying minerals at the
Abong seluas ± 428 Ha pada Wilayah IUP Abong Project covering an area of ± 428 Ha in
seluas 36.420 Ha di Kecamatan Linge, an IUP Area of 36,420 Ha in Linge District,
Kabupaten Aceh Tengah, Provinsi Aceh Central Aceh Regency, Aceh Province with
dengan Nomor 152/BA/DIT.PDLUK/LHK/2024. Number 152/BA/DIT.PDLUK/LHK/2024. This KA-
Berita Acara KA-ANDAL ini merupakan bentuk ANDAL Minutes is a form of agreement on the
kesepakatan Formulir KA-ANDAL yang KA-ANDAL Form which is the basis for PT LMR
menjadi dasar PT LMR untuk menyusun to prepare ANDAL, RKL-RPL.
ANDAL, RKL-RPL.
G. Rencana Selanjutnya Next Plan
1. Melanjutkan kegiatan eksplorasi lanjutan atau 1. Continuing further exploration activities or follow
follow up work di luar Prospek Abong, yaitu up work outside the Abong Prospect, namely
North Bintang, North Bulan, Lumut (Ujung North Bintang, North Bulan, Lumut (Ujung
Kambing dan Genting Kari). Kambing and Genting Kari).
2. Merencanakan pekerjaan pengeboran sesuai 2. Plan drilling work according to technical needs
kebutuhan teknis terkait data untuk regarding data to carry out metallurgical,
dilakukan studi metalurgi, geotek dan geotechnical and hydrogeological studies in the
hidrogeologi di dalam Prospek Abong. Abong Prospect.
Page 12
3. Melanjutkan penyelesaian studi AMDAL dan 3. Continuing to complete the AMDAL study and
Persetujuan Teknis Pemenuhan Baku Mutu Technical Approval for Fulfillment of Waste
Air Limbah dalam rangka Pembuangan Air Water Quality Standards in the framework of
Limbah ke Badan Permukaan Air serta Waste Water Disposal to Surface Water Bodies as
Persetujuan Teknis Pengelolaan Limbah B3. well as Technical Approval for Hazardous Waste
Management.
H. Hambatan Eksplorasi Barriers to Exploration
1. Adanya kegiatan Penambangan Tanpa Izin 1. There are Illegal Mining (PETI) activities in Bulan
(PETI) di Prospek Bulan. Prospect.
2. Munculnya pihak ketiga yang akan 2. The emergence of a third party that will
mengakomodir PETI di Prospek Abong. accommodate PETI in the Abong Prospect
I. Perizinan/Persetujuan Baru Yang Diperoleh New Permits/Approvals Acquired
Pada tanggal 21 Februari 2024, PT LMR telah
On February 21 2024, PT LMR received the Minutes
mendapatkan Berita Acara Rapat Tim Teknis
of the Technical Team Meeting of the Limited
Komisi Penilai AMDAL Pusat Lanjutan Terbatas
Advanced Central AMDAL Assessment Commission
Pembahasan Formulir KA-ANDAL Rencana
Discussion of the KA-ANDAL Form for the DMP
Kegiatan Penambangan dan Pengolahan Bijih
Gold Ore Mining and Processing Activity Plan at the
Emas DMP di Proyek Abong seluas ± 428 Ha
Abong Project covering an area of ± 428 Ha in the
pada Wilayah IUP seluas 36.420 Ha di
IUP Area of 36,420 Ha in Linge District, Central
Kecamatan Linge, Kabupaten Aceh Tengah,
Aceh Regency, Aceh Province with Number
Provinsi Aceh dengan Nomor
152/BA/DIT.PDLUK/LHK/2024. This KA-ANDAL
152/BA/DIT.PDLUK/LHK/2024. Berita Acara KA-
Minutes is a form of agreement on the KA-ANDAL
ANDAL ini merupakan bentuk kesepakatan
Form which is the basis for PT LMR to prepare
Formulir KA-ANDAL yang menjadi dasar PT LMR
ANDAL, RKL-RPL.
untuk menyusun ANDAL, RKL-RPL.
Page 13
V. PT Suma Heksa Sinergi
Nama Perusahaan : PT Suma Heksa Sinergi (“PT SHS”)
(Name of Company)
Tahap Kegiatan IUP : Operasi Produksi (Production Operation Phase)
(Phase of Activity of Mining Permit)
Laporan Eksplorasi Periode : Januari - Maret 2024 (January - March 2024)
(Period of Exploration Report)
A. Daerah Eksplorasi Exploration Areas
Prospek Cisadang Central Cisadang Central Prospect
B. Biaya Eksplorasi Exploration Costs
1.452.763.489 Dolar AS USD 1.452.763.489
C. Bentuk Kegiatan Eksplorasi Form of Exploration Activities
1. Melanjutkan kegiatan pemetaan geologi di 1. Continuing geological mapping activities in the
Prospek Cisadang Central. Cisadang Central Prospect.
2. Melanjutkan kegiatan rekonstruksi core 2. Continuing core drilling reconstruction
pengeboran. activities.
3. Melakukan kegiatan pengeboran di Prospek 3. Conducting drilling activities at the Cisadang
Cisadang Central untuk melanjutkan studi Central Prospect for metallurgical and
geoteknik dan hidrogeologi. geotechnical studies.
4. Melanjutkan kerjasama dengan konsultan 4. Continuing to collaborate with consultant for
untuk cadangan JORC. JORC Reserve.
5. Melakukan uji hidrogeologi slug test pada 1 5. Conducting hydrogeological “slug test” on 1
titik studi pengeboran hidrogeologi di hole of hydrogeological study drilling program
prospek Cisadang Central at Cisadang Central Prospect
6. Melakukan pemetaan hidrogeologi di area 6. Conducting hydrogeological mapping at
prospek Cisadang Central Cisadang Central Prospect.
7. Melakukan pengiriman sampel inti bor 7. Sending a total 1263 drill core samples from
sejumlah 1263 conto untuk analisa geokimia metallurgical study drilling program for
(Au, Ag, As, Sb, Cu, Pb, An, Fe, dan Hg) geochemical analysis (Au (Au, Ag, As, Sb, Cu,
dengan metode fire assay dan ICP OES multi Pb, An, Fe, dan Hg) with fire assay dan ICP OES
elemen. multi element methods.
8. Melakukan pengiriman sampel inti bor batch 8. Sending drill core sample for first batch of
pertama sejumlah total 55 sampel untuk uji geotechnical study drilling program with a total
geoteknik ke laboratorium LAPI, Institut 55 samples for geotechnical test and have been
Teknologi Bandung (ITB). sent to LAPI laboratory, Institute of Technology
Bandung (ITB).
9. Melanjutkan proses permohonan 9. Continuing the Forest Area Use Approval
Persetujuan Penggunaan Kawasan Hutan (“PPKH”) application process for further
(“PPKH”) untuk eksplorasi lanjutan. exploration.
Page 14
D. Pihak-Pihak yang Terlibat Involved Parties
1. PT Namsuma Luban Abadi 1. PT Namsuma Luban Abadi
2. AMC Consultants Pty. Ltd. 2. AMC Consultants Pty. Ltd.
3. PT COMO Engineers Indonesia 3. PT COMO Engineers
4. Koperasi Produsen Limantaka 4. Koperasi Produsen Limantaka
5. PT Asahi Diamond Industrial Indonesia 5. PT Asahi Diamond Industrial Indonesia
6. PT Haluan Baru Energi 6. PT Haluan Baru Energi
7. PT Tera Widyagama 7. PT Tera Widyagama
8. Laboratorium PT Geoservises 8. PT Geoservices Laboratory
9. PT Aporisma Solusi Cipta Integrasi 9. PT Aporisma Solusi Cipta Integrasi
10. CV Banten Centra Link 10. CV Banten Centra Link
11. CV Anugerah Makmur Sejahtera 11. CV Anugerah Makmur Sejahtera
12. PT Bahtera Ratu Engineering 12. PT Bahtera Ratu Engineering
13. PT Jarvis Sinergi Yasa 13. PT Jarvis Sinergi Yasa
14. PT Tunas Resolusi Indonesia 14. PT Tunas Resolusi Indonesia
E. Metode Pengujian dan Pemilihan Areal Testing Method and Selection of Area
- Specific Gravity - Specific Gravity
- Fire Assay - Fire Assay
- Aqua Regia Digest - Aqua Regia Digest
- Hg analysis - Hg analysis
- ICP OES 7 unsur - ICP OES 7 elements
- Uji Physical Properties (PP), Uji Brazilian (BZ), - Physical Properties (PP) Test, Brazilian Test (BZ),
Uji Uniaxial Compresive Strength (UCS), Uji Uniaxial Compresive Strength (UCS) Test,
Triaxial, Uji Direct Shear (DS) Triaxial Test, Direct Shear Test
F. Kemajuan Eksplorasi Terhadap Kegiatan Bulan Exploration Progress toward Previous Month’s
Sebelumnya Activities
1. Kegiatan rekonstruksi core pengeboran 1. Drilling core reconstruction activities have been
telah diselesaikan sebanyak 88 lubang bor completed in 88 drill holes of 205 total drill
dari total 205 lubang bor. holes.
2. Kemajuan pemetaan geologi di Prospek 2. Geological mapping progress in Cisadang
Cisadang Central sudah mencapai 85%. Central Prospect has reached 85% completion.
3. Kemajuan aktivitas pengeboran geoteknik 3. Geotechnical drilling program in Cisadang
di Prospek Cisadang Central sejumlah 2 titik Central with a total 2 holes have been realized
lubang bor sudah terealisasi dengan total and reach 475 metres out of 4 planned drill
kedalaman hingga saat ini mencapai 475 holes with a total 800 metres.
meter dari total 4 rencana titik lubang bor
dengan total target 800 meter.
4. Melakukan pengeboran hidrogeologi di 4. Conducting 1 hydrogeological drilling in
prospek Cisadang Central sebanyak 1 Cisadang Central prospect with a total depth of
lubang bor dengan total kedalaman 150 150 meters from a total of 3 planned drill holes
meter dari total rencana 3 titik lubang bor with a total target depth of 450 meters.
dengan total target kedalaman 450 meter.
Page 15
5. Penambahan data informasi kondisi 5. Additional information data for hydrogeological
hidrogeologi di area prospek Cisadang condition in the Cisadang Central Prospect.
Central.
6. Penambahan jumlah sampel hasil 6. Additional drill core samples from metallurgical
pengeboran dari titik pengeboran studi study drilling program with a total 1263
metalurgi sejumlah 1263 conto yang dikirim samples has been sent to Geoservices
ke laboratorium Geoservices untuk analisa laboratory for geochemical analysis (Au, Ag, As,
geokimia (Au, Ag, As, Sb, Cu, Pb, An, Fe, Sb, Cu, Pb, An, Fe, dan Hg) with fire assay and
dan Hg) dengan metode fire assay dan ICP ICP OES mult-element methods.
OES multi elemen.
7. Penambahan jumlah sampel hasil 7. Additional drill core samples from geotechnical
pengeboran studi geoteknik sejumlah total study drilling program with a total 55 samples
55 sampel untuk uji geoteknik ke for geotechnical analysis and has been sent to
laboratorium LAPI, Institut Teknologi LAPI laboratory, Institute of Technology
Bandung (ITB). Bandung (ITB).
G. Rencana Selanjutnya Next Plan
1. Melanjutkan pemetaan geologi di Prospek 1. Continuing geological mapping at Cisadang
Cisadang Central. Central
2. Melanjutkan kegiatan pengeboran di 2. Conducting drilling activities at the Cisadang
Prospek Cisadang Central untuk studi Central Prospect for geotechnical and
geoteknik dan hidrogeologi yang berada di hydrogeological studies in Production Forest
Kawasan Hutan Produksi (HP). Area .
3. Melanjutkan kegitan rekonstruksi core 3. Continuing of core drilling reconstruction from
pengeboran dari kegiatan pengeboran historical drillhole.
terdahulu.
H. Hambatan Eksplorasi Barriers to Exploration
1. Perizinan terkait Persetujuan Penggunaan 1. Permit related to Forest Area Use Approval
Kawasan Hutan (“PPKH”) untuk eksplorasi (“PPKH”) for further exploration is still being
lanjutan masih dalam proses pengurusan di processed in the Ministry of Environment and
Kementerian Lingkungan Hidup dan Forestry of Republic of Indonesia.
Kehutanan Republik Indonesia.
2. Keberadaan lokasi IUP PT SHS berada di 2. The location of the IUP PT SHS is near a
dekat area pemukiman masyakat. community residential area.
I. Perizinan/Persetujuan Baru Yang Diperoleh New Permits/Approvals Acquired
- -
Names mentioned 57 people and organisations named in the text · linked when the evidence is strong
unresolved
org
PT Citra Palu Minerals Nama Perusahaan
p.1
unresolved
org
PT Citra Palu Minerals
· Nama Perusahaan
p.1 ×3
unresolved
org
PT Geoservices.
p.2 ×15
unresolved
org
PT Geoservices Laboratory.
p.2 ×4
unresolved
org
PT Indo
p.2 ×2
unresolved
org
PT CPM Laboratory
p.2
unresolved
org
PT Sumagud Sapta Sinar
p.2 ×2
unresolved
org
PT IOL Indonesia
p.2 ×2
unresolved
org
PT Intertek Utama Service
p.2 ×2
unresolved
org
PT Indo Mineral Research
p.2
unresolved
org
PT Indo Mineral Research E.
p.2
unresolved
org
Direktorat Jenderal Mineral
p.4 ×2
unresolved
org
Directorate General of Mineral and Coal Batubara
p.4
unresolved
org
Ministry of Investment
p.4
unresolved
org
Kementerian LHK
p.4
unresolved
org
Ministry of Environment
p.4 ×3
unresolved
org
PT. Dairi Prima Mineral Nama Perusahaan
p.5
unresolved
org
PT. Dairi Prima Mineral
· Nama Perusahaan
p.5 ×2
unresolved
org
PT DPM
p.6 ×3
unresolved
org
Menteri Energi dan Sumber Daya
p.6
unresolved
org
PT Gorontalo Minerals
· Nama Perusahaan
p.7
unresolved
org
PT GM
p.7
unresolved
org
PT Laboratorium
p.7 ×2
unresolved
org
PT Adiprotek Envirodunia
p.8 ×2
unresolved
org
PT ITS Tekno Sains
p.8 ×2
unresolved
org
PT LAPI ITB
p.8 ×2
unresolved
org
PT Linge Mineral Resources Nama Perusahaan
p.10
unresolved
org
PT Linge Mineral Resources
· Nama Perusahaan
p.10
unresolved
org
PT LMR
p.10 ×18
unresolved
org
PT Intertek
p.10
unresolved
org
PT Intertek Laboratory
p.10
unresolved
org
Permukaan Air
p.10 ×2
unresolved
org
Kementerian Lingkungan
p.10
unresolved
org
PT Geoservices Laboratory Laboratorium
p.11
unresolved
org
PT Interlek
p.11
unresolved
org
PT Interlek Laboratory
p.11
unresolved
org
PT Bahtera Ratu Engineering
p.11 ×3
unresolved
org
PT Bahtera Ratu Engineering E.
p.11
unresolved
org
PT LMR ANDAL
p.12
unresolved
org
PT Suma Heksa Sinergi Nama Perusahaan
p.13
unresolved
org
PT Suma Heksa Sinergi
· Nama Perusahaan
p.13
unresolved
org
PT SHS
p.13 ×3
unresolved
org
PT Namsuma Luban Abadi
p.14 ×2
unresolved
org
AMC Consultants Pty. Ltd.
p.14 ×2
unresolved
org
PT COMO Engineers Indonesia
p.14
unresolved
org
PT COMO Engineers
p.14
unresolved
org
Koperasi Produsen Limantaka
p.14 ×2
unresolved
org
PT Asahi Diamond Industrial Indonesia
p.14 ×2
unresolved
org
PT Haluan Baru Energi
p.14 ×2
unresolved
org
PT Tera Widyagama
p.14 ×2
unresolved
org
PT Geoservises
p.14
unresolved
org
PT Aporisma Solusi Cipta Integrasi
p.14 ×2
unresolved
org
PT Jarvis Sinergi Yasa
p.14 ×2
unresolved
org
PT Tunas Resolusi Indonesia
p.14
unresolved
org
PT Tunas Resolusi Indonesia E.
p.14
unresolved
org
Kementerian Lingkungan Hidup
p.15
Extraction attempts how the parser did, and what it refused
Nothing structured was extracted from this document — the attempts below say why.
No extraction attempted yet.