Page 1
Laporan Kuartalan Aktivitas Eksplorasi
Quarterly Report of the Exploration Activities

PT TBS Energi Utama Tbk
Kuartal-1/ the 1st Quarter of 2024
Page 2
                    KATA PENGANTAR                            INTRODUCTION

 PT TBS Energi Utama Tbk (“Perseroan”)          PT TBS Energi Utama Tbk ("the
 adalah perusahaan pertambangan batubara        Company") is a coal mining company
 yang melakukan kegiatan penambangan di         conducting mining activities in Sangasanga
 daerah Sangasanga, Kabupaten Kutai             area, Kutai Kartanegara Regency, East
 Kartanegara, Propinsi Kalimantan Timur,        Kalimantan, which the concession area of the
 dimana area konsesi ketiga anak perusahaan     three subsidiaries is located side by side. All
 terletak berdampingan. Seluruh infrastruktur   the supporting infrastructure of mining
 pendukung      operasional   penambangan       operations such as coal hauling roads,
 seperti jalan angkut batubara, perkantoran,    offices, workshop, coal-only jetty and other
 perbengkelan, pelabuhan khusus batubara        infrastructures are located in Kutai
 dan infrastruktur lainnya berada di daerah     Kartanegara Regency, East Kalimantan.
 Kabupaten Kutai Kartanegara, Propinsi
 Kalimantan Timur.

 Perseroan mempunyai 3 (tiga) anak              The Company has 3 (three) subsidiaries
 perusahaan yang bergerak di bidang             engaged in coal mining sector, located in
 pertambangan batubara, terletak di daerah      Sangasanga area, Kutai Kartanegara
 Sangasanga, Kabupaten Kutai Kartanegara,       Regency, East Kalimantan. The company's
 Propinsi Kalimantan Timur. Adapun ketiga       subsidiaries are:
 anak perusahaan Perseroan tersebut adalah:
 1. PT Trisensa Mineral Utama (TMU)             1. PT Trisensa Mineral Utama (TMU)
 2. PT Indomining (IM)                          2. PT Indomining (IM)
 3. PT Adimitra Baratama Nusantara (ABN)        3. PT Adimitra Baratama Nusantara (ABN)

 Dalam rangka memenuhi Ketentuan III.1.6,       In order to comply with the Provisions III.1.6,
 Peraturan Nomor I-E tentang Kewajiban          Regulation     Number       I-E    concerning
 Penyampaian        Informasi,     Lampiran     Information Delivery Obligations, Attachment
 Keputusan Direksi PT Bursa Efek Jakarta No.    to the Decree of the Board of Directors of PT
 Kep-00015/BEI/01-2021 tanggal 29 Januari       Bursa Efek Jakarta No.Kep-00015/BEI/01-
 2021, maka bersama ini kami sampaikan          2021 dated January 21, 2021, we here jointly
 Laporan Kegiatan Eksplorasi Perseroan          submit the Company's Exploration Activity
 untuk Kuartal-1 2024.                          Report for the 1st Quarter of 2024.




www.tbsenergi.com
Page 3
                  BAB I                                           CHAPTER I
              PENDAHULUAN                                       INTRODUCTION



I. Latar Belakang                                 I. Background

Batubara merupakan bahan galian yang              Coal is an economically valuable excavation
bernilai ekonomis, sehingga diminati oleh         material, so it is in demand by foreign
investor asing maupung investor dalam             investors as well as domestic investors. Coal
negeri. Usaha pertambangan batubara               mining business has prospects as a mainstay
mempunyai prospek sebagai sektor andalan          sector of oil and gas replacement in building
pengganti migas dalam          membangun          the economy of East Kalimantan in the future.
perekonomian Kalimantan Timur di masa             It is based on available coal resources and
mendatang. Hal ini didasarkan pada sumber         potentials, marketing prospects as well as
daya dan potensi batubara yang tersedia,          local government policy support.
prospek    pemasaran     serta   dukungan
kebijakan pemerintah daerah.

Pengusahaan pertambangan karena sifat             Strive of the Mining business because of the
kegiatannya      pada     dasarnya       selalu   nature of its activities basically always cause
menimbulkan       perubahan       pada    alam    changes in the nature of its environment.
lingkungannya. Di balik perubahan pada            Behind the changes in nature and the
alam dan lingkungannya, suatu kenyataan           environment, it is also a fact that mining
pula bahwa usaha pertambangan telah               businesses have succeeded in improving
berhasil    meningkatkan         kesejahteraan    human welfare by providing raw materials for
manusia dengan menyediakan bahan baku             industry, energy and others.
untuk industri, energi dan lain-lain.




                    Gambar 1.1. Lokasi Tambang PT TBS Energi Utama Tbk
                       Image 1.1. PT TBS Energi Utama Tbk Mining Site
Page 4
Gambar 1.2. Skema Kegiatan Operasional Penambangan PT TBS Energi Utama Tbk
             Image 1.2. Scheme of Mining Operations of PT TBS Energi Utama Tbk




    Gambar 1.3. Lokasi Konsesi Ketiga Anak Perusahaan PT TBS Energi Utama Tbk
    Image 1.3. Concession area of The Three Subsidiaries of PT TBS Energi Utama Tbk
Page 5
I. 1. PT TRISENSA MINERAL UTAMA (“TMU”)

TMU merupakan perusahaan tambang             TMU is a coal mining company with
batubara dengan daerah penambangan           administrative mining areas including Loa
secara administratif termasuk wilayah        Janan District, Sangasanga, Muara Jawa,
Kecamatan Loa Janan, Sangasanga, Muara       Kutai Kartanegara Regency of East
Jawa, Kabupaten Kutai Kartanegara Propinsi   Kalimantan Province with an area of 3,414 ha
Kalimantan Timur dengan Luas wilayah         and regional code KTN 2010 3133 OP. TMU
3.414 ha dan kode Wilayah KTN 2010 3133      has obtained approval to conduct mining
OP. TMU telah mendapat persetujuan untuk     activities and sales of excavation products
melakukan aktivitas penambangan dan          with the Decree of the Regent of Kutai
penjualan hasil galian dengan Keputusan      Kartanegara Number: 540/3133/IUP-OP/MB-
Bupati Kutai Kartanegara Nomor :             PBAT/XII/2010 concerning approval of The
540/3133/IUP-OP/MB-PBAT/XII/2010             Production Operation Mining Business
mengenai      persetujuan   Izin   Usaha     License (KTN 2010 3133 OP) dated
Pertambangan Operasi Produksi (KTN 2010      December 14, 2010.
3133 OP) tertanggal 14 Desember 2010.

Pada Kuartal-1 2024, pelaksanaan pekerjaan   In The 1st Quarter of 2024, the
yang dilakukan oleh TMU telah menyerap       implementation of work carried out by TMU
tenaga kerja sebanyak 102 orang sedangkan    has absorbed a workforce of 102 people
untuk kontraktor dan sub-kontraktornya 776   while for contractors and sub-contractors 776
orang dan dibagi menjadi 2 shift kerja.      people and divided into 2 shifts of work. The
Kontraktor tambang yang digunakan adalah     mining contractor used is PT Manado Karya
PT    Multindo    Prima    Teknik   (MPT).   Anugrah (MKA). Mining is done by surface
Penambangan yang dilakukan dengan            open pit mining system with truck and shovel
sistem tambang terbuka (surface open pit     method.
mining) dengan metode truck dan shovel.

Produk batubara yang dihasilkan TMU          Coal products produced by TMU have an
memiliki kalori rata-rata 4900 GAR dengan    average calorie of 4900 GAR with Total
Total Sulphur (TS) di bawah 1%. Kualitas     Sulphur (TS) below 1%. The quality of this
batubara ini cukup memenuhi permintaan       coal is enough to meet the demand of the
pasar yang menginginkan batubara dengan      market who want low sulphur coal.
sulphur rendah. Pelaksanaan pengelolaan      Implementation of Occupational Safety and
Keselamatan dan Kesehatan Kerja yang         Health management implemented in TMU
diterapkan di TMU mengacu kepada             refers to the program / plan of Occupational
program/rencana Pengelolaan Keselamatan      Safety and Health Management in
dan Kesehatan Kerja sesuai dengan            accordance with applicable laws and
perundang-undangan yang berlaku.             regulations.

Kegiatan pengelolaan dan pemantauan          Environmental management and monitoring
lingkungan yang dilakukan TMU meliputi       activities carried out by TMU include greening
kegiatan penghijauan yang dilakukan di       activities carried out at the Road
Tanggul Jalan, Tanggul Stockpile, Tanggul    Embankment, Embankment Stockpile, Front
Depan Timbangan, Settling Pond, Waste        Embankment Scales, Settling Pond, Waste
Dump dan Bench Office Baru. Pada saat ini,   Dump and New Bench Office. Currently, TMU
TMU juga melakukan pengelolaan dan           also manages and monitors water quality,
pemantauan kualitas air, debu, kebisingan,   dust, noise, B3 waste and domestic waste, as
limbah B3 dan limbah domestik, serta         well as monitoring erosion rates.
pemantauan tingkat erosi.
Page 6
  I. 2. PT INDOMINING (“IM”)

  Berdasarkan Izin Usaha Produksi Nomor:          Based on Production Business License
  540/004/IUP-OP/MB-PBAT/III/2013 tanggal         Nomor: 540/004/IUP-OP/MB-PBAT/III/2013
  15 Maret 2013, IM melakukan kegiatan            dated March 15, 2013, IM conducted coal
  eksplorasi dan penambangan batubara serta       exploration and mining activities and its
  hasil produksinya di daerah Kecamatan           production in Sangasanga District, Kutai
  Sangasanga, Kabupaten Kutai Kartanegara,        Kartanegara Regency, East Kalimantan
  Propinsi Kalimantan Timur. Tahap produksi       Province. Im's production phase began in
  IM dimulai pada bulan Agustus 2007,             August 2007, while commercial production
  sedangkan produksi komersial dimulai pada       began in October 2007.
  bulan Oktober 2007.

  Kegiatan penambangan IM dilakukan               IM mining activities are carried out by mining
  kontraktor penambangan yaitu PT RPP             contractor PT RPP Contractors Indonesia
  Contractors Indonesia (RCI). Kegiatan           (RCI). Mining activities are surface open pit
  penambangan merupakan penambangan               mining with truck and shovel methods.
  terbuka (surface open pit mining) dengan
  metoda truck dan shovel.

  Pada Kuartal-1 2024, sumber daya manusia        As of 1st Quarter 2024, human resources
  yang bekerja dalam kegiatan operasional IM      working in IM's operational activities reached
  mencapai 338 tenaga kerja termasuk              338 workers including contractors and sub-
  kontraktor dan sub-kontraktor. Dari 338         contractors. Of those 338 people, about 80%
  orang tersebut sekitar 80% merupakan            are local workers to support community
  tenaga kerja lokal sebagai penunjang            development programs with the aim of
  program community development dengan            improving the welfare of the communities
  tujuan untuk meningkatkan kesejahteraan         around the mine.
  masyarakat di sekitar tambang.

  Produk batubara IM memiliki kualitas antara     IM coal products have quality between 4200
  4200 - 5600 GAR dengan total sulphur antara     - 5600 GAR with total sulphur between 0.2%
  0.2% - 2.0%. Produk cukup bersaing di dalam     - 2.0%. The product is quite competitive in the
  pasar internasional maupun domestik             international and domestic markets.

I. I. 3. PT ADIMITRA BARATAMA NUSANTARA (“ABN”)

  ABN didirikan pada tahun 2004, dan              ABN was established in 2004, and manages
  mengelola daerah pertambangan dengan            a mining area of about 2,990 ha located in
  luas area sekitar 2.990 Ha yang berlokasi di    Kampung Jawa Village, Sangasanga District
  Desa      Kampung        Jawa,   Kecamatan      and Muara Kembang Village, Muara Jawa
  Sangasanga dan Desa Muara Kembang,              District, Kutai Kartanegara Regency, East
  Kecamatan Muara Jawa, Kabupaten Kutai           Kalimantan. Based on Mining Business
  Kartanegara,         Kalimantan        Timur.   License Production Operation Number:
  Berdasarkan pada Izin Usaha Pertambangan        540/1691/IUP-OP/MB-{BAT/XII/2009 dated
  Operasi Produksi Nomor: 540/1691/IUP-           December 1, 2009, ABN conducts
  OP/MB-{BAT/XII/2009 tanggal 1 Desember          exploration, coal mining, and marketing of
  2009, ABN melakukan kegiatan eksplorasi,        production at its mine site.
  penambangan batubara, dan pemasaran
  hasil produksi di lokasi tambangnya tersebut.
Page 7
ABN mulai melakukan kegiatan eksplorasi         ABN began its exploration and infrastructure
dan pembangunan infrastruktur pada tahun        development activities in 2007, while
2007, sedangkan produksi komersial dimulai      commercial production began in 2008. ABN
pada tahun 2008. Produk batubara ABN            coal products belong to thermalcoal group
termasuk dalam kelompok thermalcoal             with sub-bituminous and bituminous rank,
dengan rank sub-bituminous dan bituminous,      with with 2 types of ABN 42 (CV 4200 GAR &
dengan 2 jenis tipe yaitu ABN 42 ( CV 4200      TS < 1) and ABN 50 (CV 5000 gar & TS<1)).
gar & TS < 1) dan ABN 50 ( CV 5000 gar &        Thermal coal is marketed to several countries
TS < 1). Thermal coal dipasarkan ke             in the world, including India, China, Japan,
beberapa negara di dunia, diantaranya India,    Italy, Thailand, and Korea. ABN also supplies
Cina, Jepang, Italia, Thailand, dan Korea.      for domestic needs, namely cement industry
ABN juga mensuplai untuk kebutuhan dalam        and several other industries.
negeri, yaitu industri semen dan beberapa
industri lainnya.

Sistem penambangan yang dilakukan ABN           ABN's mining system is surface open pit
yaitu sistem penambangan terbuka (surface       mining. Coal ABN has a low ash content, so
open pit mining). Batubara ABN memiliki         it is not done by washing process, only done
kandungan abu yang rendah, sehingga tidak       by crushing process. Mining activities of PT.
dilakukan pencucian (washing), hanya            ABN is carried out by one main contractor, PT
dilakukan proses peremukan (crushing).          RPP Contractors Indonesia (RCI).
Kegiatan penambangan PT. ABN dilakukan
oleh satu kontraktor utama, yaitu PT. RPP
Contractors Indonesia (RCI).

Pada Kuartal-1 2024, sumber daya manusia        In The 1st Quarter of 2024, human resources
yang terlibat dalam kegiatan operasional        involved in ABN's operational activities
ABN mencapai sekitar 560 orang, yang terdiri    reached about 560 people, consisting of 195
dari 195 orang tenaga kerja pada ABN dan        workers in ABN and 365 workers in
365 orang tenaga kerja pada kontraktor          contractors and sub-contractors.
maupun sub-kontraktor.

Sebagai salah satu wujud pemberdayaan           As the form of empowerment of the
masyarakat sekitar, ABN bersama-sama            surrounding community, ABN along with
dengan kontraktor dan sub-kontraktor saat ini   contractors and sub-contractors currently
telah menampung tenaga kerja lokal              have accommodated local workers in
Kecamatan Sangasanga & Kecamatan                Sangasanga District & Muara Jawa District,
Muara Jawa, Kabupaten Kutai Kartanegara         Kutai Kartanegara Regency approximately
kurang lebih 70 % dari kebutuhan tenaga         about 70% of the labor needs, while the
kerja, sedangkan sisanya sekitar 30 %           remaining about 30% comes from outside the
berasal dari luar daerah dua kecamatan          area of the two sub-districts.
tersebut.
Page 8
                BAB II                                          CHAPTER II
         KEGIATAN EKSPLORASI                               EXPLORATION ACTIVITY



II. 1. PT TRISENSA MINERAL UTAMA (“TMU”)

1. 1. DAERAH EKSPLORASI                           1. 1. EXPLORATION AREA
Pada Kuartal-1 2024 kegiatan eksplorasi           In the 1st Quarter of 2024, exploration
berupa kegiatan sampling di Pit Aktif yaitu pit   activities will be in the form of sampling
B1WA, B2A dan pit 5B36.                           activities in Active Pits, namely pit B1WA,
Kegiatan Trenching di area pit B1WA bagian        B2A and pit 5B36. Trenching activities at pit
Selatan.                                          B1WA South.

Kegiatan sampling batubara di pit aktif guna      Coal sampling activities in active pits to
mengetahui nilai kualitas nya terutama nilai      determine the quality value, especially the
total sulphur (TS) dan nilai total kalori.        total sulphur (TS) value and total calorie
kegiatan sampling batubara. Seam target           value. coal sampling activities. The target
adalah seam seam WA, WB, X di pit B1WA.           seam is the WA, WB, X seam seam in pit
Sampling di pit B2A dengan seam target            B1WA. Sampling in pit B2A with seam target
seam F, D, E H10, G20, G .Pit 5B36 dengan         seamF, D, E, H10, G20, G Pit 5B36 with
seam 42, 43, 32, 33, 34, 35, 36, 37, 47.          seam 42, 43, 32, 33, 34, 35, 36, 37, 47.

Kegiatan trenching yang bertujuan untuk           Trenching activities that aim to find potential
mencari area pit baru yang potensial untuk        new pit areas for mining. The target seam are
dilakukan penambangan. Seam targetnya             ZA and Z, Y, RU, RL, T on pit B1WA South
adalah seam ZA dan Z, Y, RU, RL, T di pit
B1WA South

1. 2. METODE PENGUKURAN                           1. 2. MEASUREMENT METHODS

Trenching                                         Trenching

Secara teknis di lapangan tim geologist           Technically in the field, the geologist team
melakukan trenching dengan membuat                conducted trenching by making an elongated
paritan memanjang memotong strike seam –          trench cutting the strike seam – seam target
seam target sebatas titik plan yang dibuat        to the point plan made earlier. This serves to
sebelumnya. Hal ini berfungsi untuk               cover the entire region so that all seams can
mengcover seluruh wilayah agar semua              be found. The average length of trenching in
seam dapat di temukan. Rata – rata panjang        a day can reach 80 m -100 m depending on
paritan trenching dalam sehari bisa mencapai      the terrain / area of work whether in a ramp,
80 m - 100 m tergantung dari medan/areal          swamp or hilly with a steep slope.
kerjanya apakah di tempat landai, rawa atau
berbukit dengan kemiringan terjal.

Pengambilan sampel untuk di mengetahui            Sampling to find out the values of quality is
nilai –nilai kualitasnya di lakukan per jarak     done per distance of 100 m between
100 m antar lubang trenching.                     trenching holes.
Page 9
Sampling                                            Sampling

Tim geologi juga melakukan sampling seam            Geologies team also sampling seam - seam
–seam di pit guna mengetahui kualitas ter           in the pit to find out the updated quality of the
update dari seam – seam yang akan                   seam - seam that will be mine.
ditambang.
Metode yang digunakan adalah:                       The methods used are:

1. Jarak antar titik sampling maksimal 20 m         1. The distance between sampling points
   per seam searah strike bukaan batubara              maximum 20 m per seam direct strike coal
   yang akan di ambil (getting).                       openings to be taken (getting).


2. Sampling ulang/update pada tiap bukaan           2. Re-sampling/update on each new layer
   layer baru pada suatu seam (maksimal 1              opening on a seam (maximum 1 layer
   bukaan layer setinggi 3 m).                         opening as high as 3 m).

3. Sampling pada seam – seam bukaan                 3. Sampling on seam – seam new openings
   baru/seam yang pertama kalinya akan di              / seam the first time will be in getting. The
   getting. Adapun plan penambangan                    mining plan until the end of the year is
   sampai dengan akhir tahun di targetkan              targeted at seam with calorie value (ar)_g
   pada seam dengan nilai Calori (ar)_g di             above 4200.
   atas 4200.


1. 3. BIAYA EKSPLORASI                              1. 3. EXPLORATION COSTS
Biaya Eksplorasi TMU yang dikeluarkan di            TMU Exploration Costs incurred in The 1st
Kuartal-1 2024 sebagai berikut:                     Quarter of 2024 as follows:

                                          Q1 2024                Year To Date
              Biaya Operasional    Anggaran Realisasi       Anggaran     Realisasi
              Operating Expense     Budget    Realization    Budget      Realization
                                     (IDR)       (IDR)        (IDR)        (IDR)
              Biaya Eksplorasi
                                  33,000,000 60,000,000 420,000,000 60,000,000
              Exploration Costs

Catatan:                                            Note:
Jumlah sampling di Kuartal-1 2024 berjumlah 24      The number of samplings in The 1st Quarter 2024
sampel. 20 hasil sampling di pit dan 4 hasil        amounted to 24 samples. 20 sampling result in
sampling trenching.                                 the pits and 4 are trenching sampling result

Biaya Eksplorasi untuk tahun 2024 yang              Exploration Cost for 2024 in accordance with
sesuai dengan RKAB 2024 bagian geologi              RKAB 2024 geological section in the form of
berupa biaya analisa kualitas batubara di           coal quality analysis cost at laboratory
laboratorium maksimal 14 sampel/bulan.              maximum 14 samples per month. The cost for
Biaya untuk kegiatan trenching yang                 trenching activities that use PC 200 units is
mengunakan unit PC 200 biayanya                     accommodate to production department for
dimaksukan ke departement produksi untuk            general work with a record of trenching
pekerjaan general dengan catatan kegiatan           activities on the unit usage timesheet.
trenching pada lembar timesheet pemakaian
unit.
Page 10
1. 4. PELAKSANAAN DAN                           1. 4. IMPLEMENTATION AND
      PENGAWASAN                                      SUPERVISION
Pengawasan     Test      Pit/Trenching  dan     Supervision of Test Pit/ Trenching sampling
sampling batubara di pit TMU di lakukan oleh    of coal in the TMU pit conducted by
Geologist TMU.                                  TMU’geologist.


1. 5. KEMAJUAN EKSPLORASI                       1. 5. EXPLORATION PROGRESS

Kesimpulan Eksplorasi TMU Kuartal-1             Conclusion of TMU Exploration in The 1st
2024                                            Quarter of 2024

Selain kegiatan trenching kami dari tim         In addition to our trenching activities from the
geologi juga melakukan sampling seam –          geology team also sampling seam-seam in
seam di pit guna mengetahui kualitas ter        the pit to find out the update quality from
update dari seam – seam yang akan di            seam - seam to be getting. The methods used
getting. Metode yang digunakan adalah:          are:

1. Jarak antar titik sampling maksimal 50 m     1. Distance between sampling points
   per seam searah strike bukaan batubara          maximum 50 m per unidirectional strike
   yang akan di ambil (getting).                   coal openings to be taken (getting)

2. Sampling ulang/update pada tiap bukaan       2. Sampling/update on each new layer
   layer baru pada suatu seam (maksimal 1          opening on one seam (maximum 1-layer
   bukaan layer setinggi 3 m).                     aperture as high as 3 m).

3. Sampling pada seam – seam bukaan             3. Sampling on seam - seam new openings
   baru/seam yang pertama kalinya akan di          / seam the first time will be in the getting.
   getting. Adapun plan penambangan                The mining plan until the end of the year
   sampai dengan akhir tahun di targetkan          is targeted at seam with calorie (ARB)
   pada seam dengan nilai Calori (ARB)             GAR value above 4200.
   GAR di atas 4200.

4. Selama Kuartal-1 2024 kegiatan berupa        4. During Q1 2024, activities in the form of
   sampling pit aktif yaitu di pit B2A dengan      active pit sampling are in pit B2A with
   seam target adalah seam F, D, E, G, H10,        target seam are seam F, D, E, G, H10,
   G20. Pit 5B36 seam 42, 43, 47, 32, 33,          G20.. Pit 5B36 seam 42, 43, 47, 32, 33,
   34, 35, 36, 37, 45. Pit B1WA dengan             34, 35, 36, 37, 45. Pit B1WA with target
   seam target Z, ZA, Y, RU, RL, T                 seam Z, ZA, Y, RU, RL, T

   Sampling hasil trenching seam Z dan ZA,         Sampling of Z and ZA , Y, RU, RL, T seam
   Y, RU, RL, T Hasil trenching ini adalah         trenching results, The result of this
   perluasan pit B1WA ke arah Selatan              trenching is the expansion of the B1WA
                                                   pit to the South

5. Rata – rata hasil analisa kualitas dari      5. The average quality analysis results of
   seam –seam tersebut di atas TM 20.54            the seam -seam above TM 20.54%, ASH
   %, ASH 2.81 %, TS 0.70 % dan nilai CAL          2.81%, TS 0.70 % and CAL (ar)
   (ar) 4.500.                                     values4.500.
Page 11
1. 6. RENCANA KEGIATAN                           1. 6. PLANS FOR FURTHER
      EKSPLORASI SELANJUTNYA                           EXPLORATION ACTIVITIES
Rencana Kegiatan Divisi Geologi Kuartal-2        The Geological Division Plan for 2nd Quarter
2024:                                            2024:

1. Melakukan pembaharuan / updating              1. Updating the Geological model based on
   model Geologi berdasarkan data updating          monthly roof/floor updating data from pit
   roof/floor bulanan dari data survey Pit          survey data and cs holes data from coal
   serta cs_holes dari data channel sampling        sampling channel data. The results of this
   batubara. Hasil dari pembaharuan model           model update are then sent to the mine
   ini kemudian di kirim ke bagian mine plan        plan enginnering section as a basis for
   enginnering sebagai dasar ajuan untuk            submissions for making pit designs for
   pembuatan design pit untuk Bulan depan.          next month.

2. Trenching di luar Rencana PIT yang di Plan    2. Trenching outside the PIT Plan that is
   kan oleh tim Engineering di tiadakan dan         planned by the Engineering team is not in
   sebagai penggantinya adalah trenching di         place and in lieu of trenching is done in the
   lakukan di plan pit yang data trenchingnya       plan pit whose trenching data is lacking or
   kurang     atau      tingkat     confidence      confidence level of continuity, seam
   kemenerusan, ketebalan seam di pit               thickness in the pit is still lacking.
   tersebut masih kurang.

3. Memonitoring adanya anomali/ struktur         3. Monitoring the presence of anomalies/
   geologi pada suatu bukaan PIT yang aktif.        geological structure in an active PIT
                                                    aperture.
4. Tim geologist akan melakukan sampling         4. The geological team will be sampling the
   pada bukaan seam seam yang berada di             seam seam openings located in the active
   pit aktif terutama mengontrol perubahan          pit, especially controlling changes in the
   nilai Total Sulfur dan nilai Kalori di seam      value of Total Sulphur and value of
   –seam ber kalori tinggi baik kearah down         Calory in seam -seam with high calories
   dip maupaun kearah strike nya.                   both towards down dip maupaun towards
                                                    his strike.
5. Memonitoring kualitas dari seam –seam         5. Monitoring the quality of seam -seam that
   yang tertambang di bulan April – Juni 2024       is mined in April        until June 2024,
   terutama dalam hal perubahan nilai TS            especially in terms of changes in TS value
   seiring penurunan elevasi dari masing –          in line with the decrease in elevation of
   masing seam yang tertambang.                     each seam that is mined.
6. Update data kualiti berdasarkan kemajuan      6. Quality data update based on mining
   penambangan pada seam–seam target di             progress on seam–seam target in
   bulan sebelumnya.                                previous month.
7. Rencana kegiatan pengeboran eksplorasi        7. The plan for exploration drilling activities
   di tahun 2024 sebanyak 78 titik bor atau         in 2024 is 78 drill points or as many as
   sebanyak 9.360 m di wilayah barat pit            9,360 m in the western area of the B3KL
   B3KL dengan seam Target seam R, S, T,            pit with seam Target seam R, S, T, U, WA,
   U, WA, WB, X, Y.                                 WB, X, Y.
Page 12
8. Rencana kegiatan pengeboran geoteknik        8. The plan for geotechnical drilling activities
   di tahun 2024 sebanyak 5 titik pemboran         in 2024 is 5 drilling points or as much as
   atau sebanyak 600 m di wilayah Barat pit        600 m in the Western area of the B3KL pit
   B3KL


II. 2. PT INDOMINING (“IM”)

2. 1. DAERAH EKSPLORASI                         2. 1. EXPLORATION AREA
Pada Kuartal-1 2024, IM tidak ada kegiatan      In the 1st Quarter of 2024, IM had no drilling
pemboran.                                       activities.

2. 2. METODE PENGUKURAN                         2. 2. MEASUREMENT METHODS
Untuk kegiatan pemboran infill menggunakan      For infill drilling activities using touch coring
metode touch coring, sedangkan untuk            method, while for geotechnical drilling is done
pemboran geoteknik dilakukan dengan             by drilling Full Coring method.
pemboran metode Full Coring.

Pemboran geoteknik dilakukan juga dengan        Geotechnical drilling is also carried out using
menggunakan metode Standart Penetration         the Standard Penetration Test (SPT) method.
Test (SPT). Prinsip kerja SPT adalah dengan     The working principle of SPT is to hit a
memukul sebuah tabung standar ke dalam          standard tube into a drill hole 45 cm deep
lubang bor sedalam 45 cm menggunakan            using a hammer weighing 63.5 KG that falls
palu dengan berat 63.5 KG yang jatuh bebas      freely from a height of 76 cm. What counts is
dari ketinggian 76 cm. Yang dihitung adalah     the number of blows to penetrate as deep as
jumlah pukulan untuk melakukan penetrasi        15 cm. The number of blows used is
sedalam 15 cm. Jumlah pukulan yang              penetration as deep as the last 30 cm.
digunakan adalah penetrasi sedalam 30 cm
terakhir.


2. 3. BIAYA EKSPLORASI                          2. 3. EXPLORATION COSTS
Biaya Eksplorasi IM yang dikeluarkan di         IM Exploration Costs incurred in the 1st
Kuartal-1 2024 sebagai berikut:                 Quarter of 2024 as follows:

                                      Q1 2024               Year To Date
          Biaya Operasional    Anggaran Realisasi      Anggaran     Realisasi
          Operating Expense      Budget   Realization   Budget      Realization
                                  (IDR)      (IDR)       (IDR)        (IDR)
          Januari/ January     83,333,333       -      83,333,333        -
          Februari/ February   83,333,333       -     166,666,666        -
          Maret/ March         83,333,333       -     249,999,999        -


2. 4. PELAKSANAAN DAN                           2. 4. IMPLEMENTATION AND
      PENGAWASAN                                       SUPERVISION
Kegiatan    Pemboran     diawasi     oleh       Drilling activities are supervised by the
Departemen Engineering Section Geologist.       Department of Engineering geologist section.
Page 13
2. 5. KEMAJUAN EKSPLORASI                         2. 5. EXPLORATION PROGRESS
Pada Kuartal-1 2024 belum ada kegiatan            As of The 1st Quarter of 2024, there are no
pemboran lanjutan. Namun ada beberapa             further drilling activities. But there are several
kegiatan Geologi yang berlanjut dilakukan,        geological activities that continue to be
diantaranya:                                      carried out, including:

1. Melakukan pembaharuan / updating               1. Updating the Geological model based on
   model Geologi berdasarkan data updating           monthly roof/floor updating data from pit
   roof/floor bulanan dari data survey Pit           survey data and cs_holes data from coal
   serta cs_holes dari data channel sampling         sampling channel data, and supervision in
   batubara, dan pengawasan dalam                    the activities of taking roof/floor
   kegiatan pengambilan data pengukuran              measurement data and cs_holes.
   roof/floor serta cs_holes tersebut.

2. Melakukan kegiatan channel sampling            2. Conducting channel sampling activities as
   serta pengukuran tebal aktual batubara di         well as actual thick measurement of coal
   lokasi Pit AB Blok 12-13 & sekitarnya             at the pit AB location Block 12-13 &
   untuk keperluan pembuatan data channel            surrounding areas for the purposes of
   sampling untuk support pembaharuan /              making data sampling channels to
   updating model Geologi dan variasi                support the renewal / updating of
   kualitas batubara dari coal inventory yang        geological models and variations in the
   akan ditambang.                                   quality of coal from coal inventory to be
                                                     mined.

3. Melakukan analisis kestabilan lereng di        3. Perform slope stability analysis in the pit
   area pit aktif Pit, baik pada sisi low wall,      active pit area, both on the low wall side,
   high wall maupun sidewall serta disposal          high wall and sidewall and disposal IPD
   IPD border Selatan, kaitannya untuk               South border, related to know the value of
   mengetahui nilai safety factor (FoS) untuk        safety factor (FoS) to control the
   kontrol pembentukan desain Pit Aktif              formation of Active Pit design to be stable
   supaya stabil dan aman.                           and safe.

2. 6. RENCANA KEGIATAN EKSPLORASI                 2. 6. PLANS FOR FURTHER
      SELANJUTNYA                                        EXPLORATION ACTIVITIES
IM pada periode Kuartal-2 2024 belum              IM fo 2nd Quarter of 2024 doesn’t have
merencanakan melakukan aktifitas kembali          planned to resume further exploration drilling
pengeboran eksplorasi lanjutan, baik itu          activities, be it infill drilling or Geotechnical
pengeboran infill maupun pengeboran               drilling in IM concession area.
Geoteknik di area konsesi IM.
Page 14
Adapun untuk rencana kegiatan eksplorasi       As for the IM exploration activity plan in 2024,
IM tahun 2024, Sehubungan dengan rencana       in connection with the mining optimization
pengoptimalan penambangan pada pit utama       plan at the Indomining main pit to a depth of
Indomining hingga kedalaman RL-175 meter       RL-175 meters according to the Mine Plan
sesuai target Mine Plan untuk pit AB dan       target for pit AB and in order to optimize the
dalam rangka mengoptimalkan mineable           mineable reserve potential seams, where
reserve seam-seam potensial, dimana            several potential seams in pit area still needs
beberapa seam-seam potensial di dalam          to be known continuity up to the lower limit
area pit masih perlu diketahui kemenerusan     (down dip) of the pit plan and lateral
hingga sampai batas bawah (down dip) dari      continuity, the company intends to conduct
rencana pit dan kemenerusan lateral, maka      infill drilling activities to increase the accuracy
perusahaan      bermaksud       mengadakan     of drilling data in the pit area to the lower limit
kegiatan pemboran infill untuk menambah        of the pit plan where some potential seams
akurasi data pemboran pada area pit hingga     from roof & floor data indicated that there was
batas bawah rencana pit dimana beberapa        thinning or pinch out laterally and/or down
seam potensial dari data roof & floor          dip.
terindikasi ada yang mengalami penipisan
atau pinchout secara lateral dan atau down
dip.

Sedangkan, tujuan dari kegiatan pemboran       Meanwhile, the purpose of the infill drilling
infill adalah untuk menambah keyakinan         activity is to increase the confidence of the
batas penyebaran lateral dari seam-seam        lateral spreading limit of potential seams that
potensial     yang  mengalami    pinchout,     has been pinch out, increase confidence in
menambah keyakinan kemenerusan serta           continuity and determine the thickness of the
mengetahui ketebalan lapisan kearah            layer towards the down dip which is indicated
downdip      yang  terindikasi  mengalami      to be thinning to the planned lower pit limit,
penipisan hingga rencana batas bawah pit,      and maximize the mineable reserve of
serta memaksimalkan mineable reserve           potential seams, and validate the update of
seam-seam potensial, dan mem-validasi          the Geology model from the update of adding
update model Geologi dari pembaruan            infill drilling data.
penambahan data pemboran infill.

Pemboran infill pada area pit AB               Infill drilling in the pit AB area is planned to be
direncanakan dilakukan sebanyak 10 titik bor   carried out as many 10 boreholes with a
dengan kedalaman lubang pemboran               maximum drilling hole depth of 100 meters
maksimal 100 meter dengan total meter yang     with a total required meter of 1000 meters.
diperlukan adalah sebanyak 1000 meter.         The work is planned to be carried out using a
Pekerjaan tersebut rencananya akan             minimum of 2 units of Jacro 300 rigs or the
dikerjakan dengan menggunakan minimal 2-       like. This infill drilling project will be carried
unit rig tipe Jacro 300 atau yang sejenis.     out using the vertical touch coring drilling
Proyek pemboran infill ini akan dilakukan      method and equipped with geophysical
dengan menggunakan metode pemboran             logging up to the drilling depth target.
touch coring vertikal dan dilengkapi dengan
geophysical logging sampai dengan target
kedalaman pemboran.
Page 15
II. 3. PT ADIMITRA BARATAMA NUSANTARA (“ABN”)

3. 1. DAERAH EKSPLORASI                         3. 1. EXPLORATION AREA
Pada Kuartal-1 2024, ABN melakukan              In the 1st Quarter of 2024, ABN conducted
update model geologi berdasarkan data           geological model updates based on channel
channel sampling serta data roof & floor        sampling data as well as actual roof & floor
aktual dari hasil pengukuran survey, serta      data from survey measurement results, as
melakukan rekonsiliasi model geologi            well as reconciling geological models to
terhadap data survey aktual.                    actual survey data.
Selain kegiatan eksplorasi didalam konsesi      Apart from exploration activities within the
IUP ABN, tim eksplorasi juga melakukan          ABN IUP concession, the exploration team
studi prospeksi dan review terhadap potensi     also carried out prospecting studies and
pengembangan bahan galian di luar IUP           reviews of the potential for developing
ABN. Pada kuartal-1, tim eksplorasi telah       minerals outside the ABN IUP. In the fourth
menyelesaikan sebanyak 8 desk studi             quarter, the exploration team completed 11 of
prospeksi terhadap potensi bahan galian         prospecting studies on the potential for new
baru meliputi batubara dan emas                 minerals including coal and gold.

3. 2. METODE PENGUKURAN                         3. 2. MEASUREMENT METHODS
Channel     sampling   dilakukan     dengan     Channel sampling is done by mapping and
mapping dan pengukuran aktual batubara          actual measurement of coal that has been
yang telah terekspos (thickness, strike, dip,   exposed (thickness, strike, dip, collar) then
collar) kemudian diambil sampel secara          taken composite sample to be analyzed coal
komposit untuk dilakukan analisa kualitas       quality as the basis for geology model update
batubara sebagai dasar untuk update model       in line with the progress of the mine. Channel
geologi seiring dengan kemajuan tambang.        sampling in the 1st Quarter of 2024 was
Chanel sampling pada Kuartal-1 dilakukan        conducted at seam S22 di Pit 4, S32 di Pit
pada seam S22 di Pit 4, S32 di Pit NW, S39,     NW, S39, S41L Pit 6, S12, S12U, S12D di Pit
S41L Pit 6, S12, S12U, S12D di Pit 8.           8.

3. 3. BIAYA EKSPLORASI                          3. 3. EXPLORATION COSTS
Biaya Eksplorasi ABN yang dikeluarkan di        ABN Exploration Costs issued in The 1st
Kuartal-1 2024 sebagai berikut:                 Quarter of 2024 as follows:

                                     Q1 2024                Year To Date
          Biaya Operasional Anggaran      Realisasi    Anggaran     Realisasi
          Operating Expense    Budget     Realization   Budget      Realization
                                (IDR)        (IDR)       (IDR)        (IDR)
          Januari/ January   399,300,000        -     399,300,000        -
          Februari/ February       -            -     399,300,000        -
          Maret/ March             -            -     399,300,000        -


3. 4. PELAKSANAAN DAN                           3. 4. IMPLEMENTATION AND
      PENGAWASAN                                      SUPERVISION
Kegiatan dilaksanakan & diawasi oleh            Activities are carried out and supervised by
Departemen Mining section Geotech &             the Department of Mining section Geotech &
Exploration Development.                        Exploration Development.
Page 16
3. 5. KEMAJUAN EKSPLORASI                        3. 5. EXPLORATION PROGRESS
Pada Kuartal-1 2024 tidak ada kegiatan           In The 1st Quarter of 2024 there are no
pemboran    eksplorasi, namun  berikut           exploration drilling activities, but the following
kegiatan team geologi selama Kuartal-1           are the activities of the geological team during
2024:                                            The 1st Quarter of 2024:

1. Melakukan monitoring di area Pit Aktif,       1. Monitoring the Active Pit area, both slope
   baik monitoring kestabilan lereng maupun         stability monitoring and coal monitoring to
   monitoring batubara untuk memantau               monitor the suitability between geological
   kesesuaian antara Model Geologi &                models and actual in the field.
   aktual di lapangan.
2. Update Model Geologi berdasarkan data         2. Geological Model Update based on coal
   roof/floor batu bara dari data survey            roof/floor data from actual survey data and
   actual dan dari data pemboran                    drilling data.
3. Analisa kestabilan lereng di area Low         3. Analysis of slope stability in low wall pit
   Wall Pit Aktif & area disposal.                  area active & disposal area.
4. Monitoring kestabilan lereng untuk pit dan    4. Pit and disposal slope stability monitoring
   disposal dengan titik pantau prisma dan          using monitoring point prism and EWS
   ekstensometer EWS.                               ekstensometer.
5. Pemasangan sensor EWS di Pit 6 & Pit          5. EWS extensometer sensor installation in
   NW.                                              Pit 6 & Pit NW.
6. Menindaklanjuti beberapa IUP yang             6. Follow up on several potential IUP for
   potensial untuk dilakukan eksplorasi             detailed exploration.
   detail.


3. 6. RENCANA KEGIATAN                           3. 6. PLANS FOR FURTHER
      EKSPLORASI SELANJUTNYA                           EXPLORATION ACTIVITIES
Rencana ABN pada periode Kuartal-2 2024          In the 2nd quarter of 2024, ABN has no plans
tidak ada rencana kegiatan pemboran. Selain      for drilling activities. However, exploration
itu kegiatan eksplorasi dan geologi              activities are focused on the following
difokuskan pada kegiatan berikut:                activities:

1. Pengambilan sample untuk update               1. Sampling for coal quality updates &
   kualitas batubara & model geologi di area        geological models in the Active Pit area.
   Pit Aktif.
2. Monitoring di area Pit Aktif untuk            2. Monitoring in the Active Pit area to monitor
   memantau kesesuaian antara Model                 the suitability between actual and
   Geologi dan aktual di lapangan.                  Geological Models in the field.
3. Melakukan update Model Geologi                3. Update geological model based on
   berdasarkan data channel sampling, data          sampling channel, actual survey data and
   survey aktual dan data pemboran.                 drilling data.
4. Rekonsiliasi antara Model Geologi             4. Reconciliation between Geological Model
   terhadap data survey aktual.                     to actual survey data.
5. Monitoring geotek di area Pit & Disposal.     5. Geotech monitoring in Pit & Disposal
                                                    Area.
6. Analisa kestabilan lereng pit dan disposal.   6. Slope stability analysis for Pit and
                                                    Disposal.
7. Pemasangan monitoring point          untuk    7. Monitoring point installation for slope
   pemantauan pergerakan lereng.                    movement monitoring program.

File

File Open PDF
Source IDX
Size0.53 MB
Published6 Apr 2024
Pages16
Characters45,173
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 12 people and organisations named in the text · linked when the evidence is strong

linked org TBS Energi Utama Tbk p.1 ×26
unresolved org PT Trisensa Mineral Utama p.2 ×4
unresolved org PT Indomining p.2 ×4
unresolved org PT Adimitra Baratama Nusantara p.2 ×4
unresolved org PT Kep- p.2
unresolved org PT Manado Karya p.5
unresolved org PT RPP p.6
unresolved org PT RPP Contractors Indonesia Contractors Indonesia p.6
unresolved org PT. ABN p.7
unresolved org PT. RPP Contractors Indonesia p.7
unresolved org Departemen Engineering Section Geologist. p.12
unresolved org Departemen Mining p.15

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result