Skip to content
Back to announcement

20240405_ELSA_Laporan Informasi dan Fakta Material_31625630_lamp2.pdf

Other Text extracted ELSA

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 1

Page 1
Narahubung:
Jayanty Oktavia Maulina (Anty)
Manager of Corporate Communications
Graha Elnusa 16th Floor, Jl. TB Simatupang Kav. 1B, Jakarta 12560
Tel: (021) 7883 0850 | Fax: (021) 7883 0907 | Mob: +62813 1787 1717
E-mail: jayanty.maulina@elnusa.co.id


Press Release
Elnusa's Readiness to Support National Energy Supply
   During the Ramadan and Eid Al-Fitr 2024 Period
Jakarta, April 5 2024 - PT Elnusa Tbk (Elnusa, IDX:ELSA), through the energy distribution and logistics services segment
managed by its subsidiary PT Elnusa Petrofin (EPN) is also contributing to being part of the 2024 Ramadan Idul Fitri (RAFI)
Task Force. to distribute energy throughout the country. Elnusa is committed to supporting PT Pertamina Patra Niaga in
the RAFI Task Force starting from March 25 to April 21 2024.

To ensure the work goes well, EPN has prepared 6,130 Tank Car Crew (AMT) personnel who have been equipped with
competency and certification and 1,965 Tank Car (MT) vehicles for use in all operational areas. Apart from that, EPN also
provides storage gas stations in several areas, 132 MT Spot Charter units, and also prepares alternatives for mobilizing AMT
from other locations that have been significantly impacted by the RAFI Task Force.

EPN also continues to be committed to maintaining the availability of LPG in the Amurang LPG Depot operating unit areas
in South Minahasa, Manado, Gorontalo and EPN's SPBE and SPPBE operating unit areas such as Bima, West Nusa Tenggara,
Semper, North Jakarta, and Gunungsitoli Nias, North Sumatra.

EPN's Director of Operations and Marketing, Ferdiansyah said, "As part of the RAFI Task Force, everything has been
prepared optimally to realize our commitment to support Pertamina Patra Niaga to ensure the smooth supply and
distribution of fuel and LPG to the community during the Ramadan - Idul Fitri 2024 period. "said Ferdiansyah.

Ferdiansyah added, "We realize that HSSE is a top priority, for this reason we ensure that all parties involved can carry out
their duties in accordance with applicable HSSE rules. "To ensure the health of the personnel on duty, EPN always carries
out daily fit to work, medical check-ups, and provides vitamins to keep the body fit while working," said Ferdiansyah.

"As an effort to support energy distribution operations, we are building intensive communication within the Elnusa Group
and Pertamina Group, as well as involving security forces. "Due to these various efforts, EPN is ready to support PT
Pertamina Patra Niaga in carrying out its mission optimally and maintaining energy security, especially during the period of
Ramadan to Eid al-Fitr 2024," concluded Ferdiansyah.

About Elnusa (IDX: ELSA)
Elnusa is a subsidiary of PT Pertamina Hulu Energi (PHE), which is part of the Pertamina Upstream Subholding, operating in the field of integrated energy
services to provide total solutions. Elnusa has a DNA of resilience and innovation for over 54 years in the energy industry, with core competencies in
upstream oil and gas services, energy distribution and logistics services, as well as support services. The upstream oil and gas services line includes
Geoscience & Reservoir services (land, transition zone & marine, as well as data processing), drilling & field maintenance services (drilling & workover),
engineering, procurement, construction & operation maintenance (EPC-OM) services. The energy distribution and logistics services line includes fuel
transportation services, depot management, and chemical sales. The support services line includes marine support services, fabrication, and data
management. Elnusa is committed to implementing Corporate Governance in accordance with GCG principles to realize a highly competitive, continuously
growing company and provide sustainability for all stakeholders. For more information, please visit www.elnusa.co.id.

File

File Open PDF
Source IDX
Size0.65 MB
Published5 Apr 2024
Pages1
Characters3,854
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 4 people and organisations named in the text · linked when the evidence is strong

linked org PT Pertamina Patra Niaga p.1 ×4
linked org PT Pertamina Hulu Energi p.1
possible org Elnusa Tbk p.1 ×2
unresolved org PT Elnusa Petrofin p.1

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result