Source file signed link, expires in 15 minutes
Extracted text 30
Page 1
PT AMMAN MINERAL INTERNASIONAL TBK (AMMN) Annual Public Expose 2024 FY2023 Earnings Results 27 March 2024
Page 2
TABLE OF CONTENT
Page 3
Disclaimer
Page 4
FY2023 HIGHLIGHTS
Page 5
FY2023 PRODUCTION AND SALES
SURPASSED PRE-IPO FORECAST
•
•
•
•
•
•
•
•
Page 6
MAINTAINED FINANCIAL RESILIENCE WHILE
ENSURING COMPLIANCE WITH THE
DYNAMIC REGULATORY ENVIRONMENT
•
•
•
•
•
•
•
•
•
Page 7
SMELTER AND PMR PROJECTS PROGRESS EXPONENTIALLY
•
•
•
•
•
•
•
•
•
•
Page 8
Operations Update
Page 9
MINING OPERATIONS ACHIEVED ALL-TIME HIGH
THROUGHOUT BATU HIJAU LIFE
• •
•
Page 10
ANNUAL PRODUCTION
In 2023, we mined less from fresh ore compared to 2021; however, we outperformed
metals production.
Page 11
QUARTERLY PRODUCTION
In October 2023, mining broke historical records for monthly materials mined.
Page 12
PRODUCTION SURPASSED PRE-IPO FORECAST, JUST SHY OF POST-IPO GUIDANCE • • •
Page 13
HIGH SAFETY PERFORMANCE INDICATED BY TRIFR
TRIFR measures how frequently recordable work-related injuries, such as lost time, medical
treatment, and restricted work injuries, occur for each one million hours worked
•
•
•
Page 14
Project Expansion Update
Page 15
•
•
KEEP YOUR
HEADER LIGHT AND
CONFIDENT
Page 16
SMELTER PROGRESS SURPASSED THE TARGET AMMN's copper smelter and PMR will have an aggregate input capacity of 900,000 tonnes of copper concentrate per annum.
Page 17
COMPLETED ACCELERATION PLAN TO ENSURE POWER SUPPLY FROM CCPP IS READY FOR SMELTER COMMISSIONING • • •
Page 18
THE PROCESSING PLANT EXPANSION UPDATE
• •
•
•
•
•
Page 19
THE PROCESSING PLANT EXPANSION UPDATE
Page 20
Financial Update
Page 21
ACHIEVED ALL-TIME HIGH MINING PRODUCTIVITY
WHILE MAINTAINING FINANCIAL RESILIENCE
•
• ±
•
•
•
•
•
•
•
•
Page 22
WE RECORDED STRONG RESULTS DESPITE CHALLENGES
Page 23
EXOGENOUS FACTORS PRESSURED PERFORMANCE
•
•
Page 24
NET SALES REBOUNDED, WITH Q4 2023 AS THE
STRONGEST-PERFORMING QUARTER
Page 25
MAINTAINED COST DISCIPLINE AND PRUDENT FINANCIAL MANAGEMENT IN 2023
Page 26
DEVELOPMENT TIMELINE
Page 27
BANK LOANS AND IPO PROCEEDS HELP FUND THE EXPANSION PROJECTS
Page 28
ESG Update
Page 29
• •
•
•
SIGNED A LETTER OF
COMMITMENT WITH
THE COPPER MARK
Page 30
THANK YOU
Names mentioned 1 people and organisations named in the text · linked when the evidence is strong
Extraction attempts how the parser did, and what it refused
Nothing structured was extracted from this document — the attempts below say why.
No extraction attempted yet.