Page 1
PT AMMAN MINERAL
INTERNASIONAL TBK
(AMMN)
Annual Public Expose 2024
FY2023 Earnings Results
27 March 2024
Page 2
TABLE OF CONTENT
Page 3
Disclaimer
Page 4
FY2023
  HIGHLIGHTS
Page 5
    FY2023 PRODUCTION AND SALES
    SURPASSED PRE-IPO FORECAST

•

•
•
•




•
    •




    •

    •
Page 6
    MAINTAINED FINANCIAL RESILIENCE WHILE
    ENSURING COMPLIANCE WITH THE
    DYNAMIC REGULATORY ENVIRONMENT

•
•

•
     •
         •
         •
     •
         •
         •
Page 7
SMELTER AND PMR PROJECTS PROGRESS EXPONENTIALLY



                   •
                   •
                   •
                   •

                   •




                        •
•

                        •

•
•
Page 8
Operations
  Update
Page 9
MINING OPERATIONS ACHIEVED ALL-TIME HIGH
THROUGHOUT BATU HIJAU LIFE



               
       




•                        •


•
Page 10
ANNUAL PRODUCTION
In 2023, we mined less from fresh ore compared to 2021; however, we outperformed
metals production.



                           
             
                                                                       




                                                                       
             
                                                         
Page 11
QUARTERLY PRODUCTION
In October 2023, mining broke historical records for monthly materials mined.



                               
                     
                                                                                
                                                                   




                                
                                                                               
                     
                                                         
                                                                    
Page 12
PRODUCTION SURPASSED PRE-IPO FORECAST, JUST
SHY OF POST-IPO GUIDANCE




•


•



•
Page 13
HIGH SAFETY PERFORMANCE INDICATED BY TRIFR
TRIFR measures how frequently recordable work-related injuries, such as lost time, medical
treatment, and restricted work injuries, occur for each one million hours worked




                                              •

                                              •



                                              •
Page 14
Project
  Expansion Update
Page 15
                   •
                   •




KEEP YOUR
HEADER LIGHT AND
CONFIDENT
Page 16
SMELTER PROGRESS SURPASSED THE TARGET
AMMN's copper smelter and PMR will have an aggregate input capacity of 900,000 tonnes of
copper concentrate per annum.
Page 17
COMPLETED ACCELERATION PLAN TO ENSURE POWER SUPPLY
FROM CCPP IS READY FOR SMELTER COMMISSIONING

•
•



•
Page 18
THE PROCESSING PLANT EXPANSION UPDATE



•                           •



                            •

                            •


•
                            •
Page 19
THE PROCESSING PLANT EXPANSION UPDATE
Page 20
Financial
  Update
Page 21
ACHIEVED ALL-TIME HIGH MINING PRODUCTIVITY
WHILE MAINTAINING FINANCIAL RESILIENCE

•


•                                            ±



•
    •
        •
        •
    •
        •
        •

•
Page 22
WE RECORDED STRONG RESULTS DESPITE CHALLENGES




                                              




                                            
Page 23
EXOGENOUS FACTORS PRESSURED PERFORMANCE


•


                                   




•
                       
               
                                    
Page 24
NET SALES REBOUNDED, WITH Q4 2023 AS THE
STRONGEST-PERFORMING QUARTER


                          
                                           
Page 25
MAINTAINED COST DISCIPLINE AND PRUDENT
FINANCIAL MANAGEMENT IN 2023
Page 26
DEVELOPMENT TIMELINE




                
                   
                        









Page 27
BANK LOANS AND IPO PROCEEDS HELP FUND THE
EXPANSION PROJECTS
Page 28
ESG
  Update
Page 29
                     •   •




                         •

                     •




SIGNED A LETTER OF
COMMITMENT WITH
THE COPPER MARK
Page 30
THANK YOU

File

File Open PDF
Source IDX
Size7.22 MB
Published27 Mar 2024
Pages30
Characters3,950
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 1 people and organisations named in the text · linked when the evidence is strong

linked org AMMAN MINERAL INTERNASIONAL TBK p.1 ×2

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result