Extracted text 6

Page 1
Go To English Page

 Nomor Surat                           129/PGE500/2026-S0

 Nama Perusahaan                       PT Pertamina Geothermal Energy Tbk

 Kode Emiten                           PGEO

 Lampiran                              0
                                       PGE-PLN IP Sepakati Tarif Listrik, Proyek PLTP Lahendong Bottoming Unit 15
 Perihal
                                       MW Siap Melangkah ke Tahap Berikutnya


Dengan ini kami untuk dan atas nama perusahaan menyampaikan Laporan Informasi atau Fakta Material sebagai
berikut:

 Nama Emiten atau Perusahaan Publik            PT Pertamina Geothermal Energy Tbk

 Bidang Usaha                                  Menyelenggarakan usaha bidang panas bumi dari hulu/hilir



 Telepon                                       +62 21 3983 3222

 Faksimili                                     +62 21 3983 3230

 Alamat Surat Elektronik (email)               datapge@pertamina.com


 Tanggal Kejadian                              14 April 2026
 Jenis Informasi atau Fakta Material           PGE-PLN IP Sepakati Tarif Listrik, Proyek PLTP Lahendong
                                               Bottoming Unit 15 MW Siap Melangkah ke Tahap Berikutnya
Page 2
Uraian Informasi atau Fakta Material   Konsorsium PT Pertamina Geothermal Energy Tbk (PGE)
                                       (IDX: PGEO) dan PT PLN Indonesia Power (PLN IP)
                                       mencapai kesepakatan tarif listrik dengan PT PLN (Persero)
                                       untuk pengembangan proyek Pembangkit Listrik Tenaga
                                       Panas Bumi (PLTP) Lahendong Bottoming Unit berkapasitas
                                       15 megawatt (MW). Kesepakatan tersebut ditandai dengan
                                       penandatanganan Berita Acara Kesepakatan Tarif yang
                                       dilaksanakan di Bandung, Jawa Barat.

                                       Penandatanganan ini menjadi bagian dari proses
                                       pengembangan proyek sekaligus menegaskan komitmen para
                                       pihak dalam mendorong pemanfaatan energi panas bumi
                                       secara lebih optimal sebagai sumber energi bersih yang
                                       berkelanjutan. Kesepakatan tarif yang dicapai juga merupakan
                                       salah satu langkah penting dalam proses pengadaan
                                       pembangkit melalui skema Independent Power Producer (IPP)
                                       sebelum proyek memasuki tahap pengembangan selanjutnya.

                                       Proyek PLTP Lahendong Bottoming Unit merupakan
                                       pengembangan pembangkit yang memanfaatkan teknologi
                                       binary (bottoming cycle). Teknologi ini mengolah panas sisa
                                       dari operasi pembangkit panas bumi eksisting untuk
                                       menghasilkan tambahan listrik. Melalui pendekatan tersebut,
                                       bottoming cycle memungkinkan pemanfaatan sumber daya
                                       panas bumi secara lebih optimal dengan menangkap energi
                                       panas yang sebelumnya belum dimanfaatkan dalam proses
                                       pembangkitan.

                                       Direktur Utama PT Pertamina Geothermal Energy Tbk Ahmad
                                       Yani menyampaikan bahwa capaian ini merupakan langkah
                                       lanjutan PGE bersama PLN IP dalam mendukung percepatan
                                       transisi energi nasional berbasis energi bersih.

                                       Kami menyambut baik perkembangan proyek ini yang terus
                                       berjalan sesuai rencana. Pemanfaatan teknologi bottoming
                                       memungkinkan potensi energi panas bumi yang masih
                                       tersedia dari operasi pembangkit eksisting dapat dimanfaatkan
                                       secara lebih optimal. Melalui teknologi ini, panas sisa yang
                                       sebelumnya belum termanfaatkan dapat dikonversi kembali
                                       menjadi listrik, sehingga meningkatkan efisiensi pembangkitan
                                       sekaligus memperkuat kontribusi panas bumi dalam bauran
                                       energi bersih nasional. Ke depan, kami siap melanjutkan
                                       proyek ini ke tahapan berikutnya agar manfaatnya dapat
                                       segera dirasakan oleh masyarakat, ujarnya.

                                       Setelah kesepakatan tarif tercapai, pengembangan proyek
                                       akan dilanjutkan dengan sejumlah tahapan lanjutan. Tahapan
                                       tersebut meliputi pembentukan joint venture, pelaksanaan
                                       proses Engineering, Procurement, Construction, and
                                       Commissioning (EPCC), hingga penyusunan Power Purchase
                                       Agreement (PPA). Melalui tahapan tersebut, proyek ini
                                       ditargetkan dapat mencapai Commercial Operation Date
                                       (COD) pada tahun 2028.

                                       Sebelumnya, pada akhir Desember 2025, PGE dan PLN IP
                                       juga telah mencapai kesepakatan tarif listrik untuk proyek
                                       PLTP Ulubelu Bottoming Unit berkapasitas 30 MW. Kedua
                                       proyek ini merupakan bagian dari sinergi dua afiliasi BUMN di
                                       bawah PT Pertamina (Persero) dan PT PLN (Persero)
                                       tersebut, dalam pengembangan energi panas bumi di 19
                                       proyek eksisting dengan total kapasitas sekitar 530 MW.

                                       Sebagai pionir pengembangan energi panas bumi di Indonesia
Page 3
                                           dengan pengalaman lebih dari empat dekade, PGE terus
                                           memperluas pemanfaatan potensi panas bumi melalui
                                           berbagai inovasi teknologi serta pengembangan proyek
                                           strategis. Saat ini, PGE mengelola kapasitas terpasang
                                           sebesar 727 MW dari enam wilayah operasi (own operation).
                                           Selain itu, PGE turut mengembangkan sejumlah proyek untuk
                                           mendukung peningkatan kapasitas terpasang dalam beberapa
                                           tahun ke depan.

Dampak kejadian, informasi atau fakta
material tersebut terhadap kegiatan
operasional, hukum, kondisi keuangan,
atau kelangsungan usaha Emiten atau
Perusahaan Publik



Demikian untuk diketahui.


Hormat Kami,
PT Pertamina Geothermal Energy Tbk




Kitty Andhora

Corporate Secretary




PT Pertamina Geothermal Energy Tbk
Grha Pertamina - Tower Pertamax Lt.7
Telepon : +62 21 3983 3222, Fax : +62 21 3983 3230, https://www.pge.pertamina.



Nama Pengirim                     Kitty Andhora

Jabatan                           Corporate Secretary
Tanggal dan Waktu                 14-04-2026 09:47




   Dokumen ini merupakan dokumen resmi PT Pertamina Geothermal Energy Tbk yang tidak memerlukan tanda
tangan karena dihasilkan secara elektronik oleh sistem pelaporan elektronik. PT Pertamina Geothermal Energy Tbk
                   bertanggung jawab penuh atas informasi yang tertera didalam dokumen ini.
Page 4
Go To Indonesian Page

 Letter / Announcement No.           129/PGE500/2026-S0

 Issuer Name                         PT Pertamina Geothermal Energy Tbk

 Issuer Code                         PGEO

 Attachment                          0

 Subject                             PGE and PLN IP Agree on Electricity Rates; Lahendong Geothermal Power
                                     Plant's 15 MW Bottoming Unit Project Ready to Move to the Next Phase

The company hereby announce the Material Information or Facts Report as follows

 Name of Issuer or Public Company            PT Pertamina Geothermal Energy Tbk

 Business Activities                         Menyelenggarakan usaha bidang panas bumi dari hulu/hilir


 Telephone                                   +62 21 3983 3222

 Faximile                                    +62 21 3983 3230

 Email Address                               datapge@pertamina.com


 Date of Event                               14 April 2026

                                             PGE and PLN IP Agree on Electricity Rates; Lahendong
 Type of Material Information or Facts       Geothermal Power Plant's 15 MW Bottoming Unit Project
                                             Ready to Move to the Next Phase
Page 5
Description of Material Information or   A consortium comprising PT Pertamina Geothermal Energy
Facts                                    Tbk (PGE) (IDX: PGEO) and PT PLN Indonesia Power (PLN
                                         IP) has reached an electricity tariff agreement with PT PLN
                                         (Persero) for the development of the 15-megawatt (MW)
                                         Lahendong Bottoming Unit Geothermal Power Plant (PLTP)
                                         project. The agreement was formalized with the signing of the
                                         Tariff Agreement Minutes, which took place in Bandung, West
                                         Java.

                                         This signing is part of the projects development process and
                                         reaffirms the parties commitment to promoting the more
                                         optimal utilization of geothermal energy as a sustainable clean
                                         energy source. The tariff agreement reached is also a crucial
                                         step in the power plant procurement process through the
                                         Independent Power Producer (IPP) scheme before the project
                                         enters its next development phase.

                                         The Lahendong Bottoming Unit Geothermal Power Plant
                                         project involves the development of a power plant utilizing
                                         binary (bottoming cycle) technology. This technology
                                         processes waste heat from existing geothermal power plant
                                         operations to generate additional electricity. Through this
                                         approach, the bottoming cycle enables more optimal utilization
                                         of geothermal resources by capturing thermal energy that was
                                         previously unused in the power generation process.

                                         Ahmad Yani, President Director of PT Pertamina Geothermal
                                         Energy Tbk, stated that this achievement represents a further
                                         step by PGE and PLN IP in supporting the acceleration of the
                                         national clean energy transition.

                                         We welcome the progress of this project, which continues to
                                         proceed as planned. The use of bottoming technology allows
                                         the remaining geothermal energy potential from existing power
                                         plant operations to be utilized more optimally. Through this
                                         technology, previously unused waste heat can be converted
                                         back into electricity, thereby improving generation efficiency
                                         while strengthening geothermal energys contribution to the
                                         national clean energy mix. Moving forward, we are ready to
                                         advance this project to the next phase so that its benefits can
                                         be felt by the public as soon as possible, he said.

                                         Once a tariff agreement is reached, project development will
                                         proceed through several subsequent phases. These phases
                                         include the formation of a joint venture, the execution of the
                                         Engineering, Procurement, Construction, and Commissioning
                                         (EPCC) process, and the drafting of a Power Purchase
                                         Agreement (PPA). Through these phases, the project is
                                         targeted to achieve Commercial Operation Date (COD) in
                                         2028.

                                         Previously, in late December 2025, PGE and PLN IP also
                                         reached an agreement on electricity tariffs for the 30-MW
                                         Ulubelu Bottoming Unit geothermal power plant project. These
                                         two projects are part of the synergy between the two state-
                                         owned enterprise affiliates under PT Pertamina (Persero) and
                                         PT PLN (Persero) in the development of geothermal energy
                                         across 19 existing projects with a total capacity of
                                         approximately 530 MW.

                                         As a pioneer in geothermal energy development in Indonesia
                                         with over four decades of experience, PGE continues to
                                         expand the utilization of geothermal potential through various
Page 6
                                              technological innovations and the development of strategic
                                              projects. Currently, PGE manages an installed capacity of 727
                                              MW across six operational regions (own operations).
                                              Additionally, PGE is developing several projects to support an
                                              increase in installed capacity in the coming years.
 Impact of event, material information or
 facts towards Issuers or Public
 Company’s operational activities, legal,
 financial condition, or going concern




Thus to be informed accordingly.


Respectfully,
PT Pertamina Geothermal Energy Tbk




Kitty Andhora

Corporate Secretary




PT Pertamina Geothermal Energy Tbk
Grha Pertamina - Tower Pertamax Lt.7
Phone : +62 21 3983 3222, Fax : +62 21 3983 3230, https://www.pge.pertamina.com



Sender Name                          Kitty Andhora

Function                             Corporate Secretary

Date and Time                        14-04-2026 09:47




   This is an official document of PT Pertamina Geothermal Energy Tbk that does not require a signature as it was
      generated electronically by the electronic reporting system. PT Pertamina Geothermal Energy Tbk is fully
                            responsible for the information contained within this document.

File

File Open PDF
Source IDX
Size0.01 MB
Published14 Apr 2026
Pages6
Characters16,113
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 6 people and organisations named in the text · linked when the evidence is strong

linked org Pertamina Geothermal Energy Tbk · Nama Perusahaan p.1 ×47
linked person Ahmad Yani p.2 ×2
possible org PT Pertamina (Persero) p.2 ×2
unresolved org PT PLN Indonesia Power p.2 ×2
unresolved org PT PLN (Persero) p.2 ×4
unresolved person Kitty Andhora · Corporate Secretary p.3 ×2

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result