Skip to content
Back to announcement

20240115_MBMA_Laporan Penggunaan Dana Hasil Penawaran Umum_31568808_lamp1.pdf

Other Text extracted MBMA

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 5

Page 1 OCR 0.923
L

PT Merdeka Battery Materials Tbk

MERDEKA

tr

MATERIALS

No.: 002/MBM-JKT/CORSEC/LRPD/I/2024

Kepada Yth. / To:

Treasury Tower 69" Floor
t8 SCBD Lot. 28

South Jakarta 12190, Indonesia

E investorrelations@merdekabatterycom

www.merdekabattery.com

Jakarta, 15 Januari/January 2024

Kepala Executive Pengawas Pasar Modal / Executive Chief of the Capital Market Supervisory

Otoritas Jasa Keuangan Republik Indonesia (“OJK”)
Gedung Soemitro Djojohadikusumo

Jl. Lapangan Banteng Timur No. 2-4

Jakarta 10710

U.p/Attn 6 Direktur Penilaian Keuangan Perusahaan Sektor Riil/
Director of Corporate Financial Assessment in the Real Sector

Perihal/Re.

Penyampaian Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum Perdana

Saham PT Merdeka Battery Materials Tbk (“Perseroan”) /
Report on the Realization of the Appropriation of Funds Resulting from Initial Public
Offering PT Merdeka Battery Materials Tbk (the “Company”)

Dengan hormat,

Dalam rangka memenuhi ketentuan dalam
Peraturan OJK No. 30/POJK.04/2015 tentang
Laporan Realisasi Penggunaan Dana Hasil
Penawaran Umum Perdana Saham serta Angka
IV.1.3 Keputusan Direksi PT Bursa Efek Indonesia
Nomor: Kep-00066/BEI/09-2022 tanggal 1 Oktober
2022 tentang Perubahan Peraturan Nomor I-E
tentang Kewajiban Penyampaian Informasi
(“Peraturan I-E”), bersama ini kami sampaikan
Laporan Realisasi Penggunaan Dana Hasil
Penawaran Umum Perdana Saham sebagaimana
terlampir.

Demikian surat ini kami sampaikan. Terima kasih
atas perhatian dan kerjasamanya.

Hormat kami / Kind regards,
PT Merdeka Battery Materials Tbk

Deny Greviartana ya
Sekretaris Perusahaan / Corporate Secretary

Dear Sir / Madam,

Following the OJK Regulation No. 30/POJK.04/2015
regarding Report on the Realization of the
Appropriation of Funds Resulting from Initial Public
Offering and Article IV.1.3 of Decision Letter of the
Board of Directors of the Indonesian Stock Exchange
No. Kep-00066/BEI/09-2022 dated 1 October 2022
regarding Amendment of Regulation Number I-E on
Obligation to Disclosure of Information (“Regulation
I-E”), the Company hereby submits a Report on the
Realization of the Appropriation of Funds Resulting
from Initial Public Offering as attached.

Thus to be informed accordingly, thank you for your
attention and cooperation.

4 f
Paraf / Initial: (A k
TT
Page 2 OCR 0.592
?

MERDEKA
BATTERY

MATERIALS

LAMPIRAN / APPENDIX 1
Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum Perdana Saham /
Report on the Realization of the Appropriation of Funds Resulting from Initial Public Offering
untuk Periode sampai dengan 31 Des 2023 / for the Period until 31 Dec 2023

PT Merdeka Battery Materials Tbk
Treasury Tower 69” Floor

District 8 SCBD Lot. 28

Jl Jenderal Sudirman Kav. 52-53
South Jakarta 12190, Indonesia

T 162213952 5581

FP 462213952 5582

E investor.relationsmerdekabattery.com
www.rmerdekabattery.com

Rencana Penggunaan Dana Menurut Prospektus / Realisasi Penggunaan Dana Menurut Prospektus / Sisa Dana Hasil Penawaran Umum /
Wlai Reslisasi Hasil Penawaran Umum / Plan of the Appropriation of Funds following Prospectus Reoliration of the Appropriation of Funds following Prospectus Remaining Funds from the Public Offering
Amount of Proceed from the Public Offering ” ” " SA
(Lampiran / Appendix 2) (Lampiran / Appendix 2) (Lampiran / Appendir 2)
(dalam Rp juta) / in million IDR (dalam Rp juta) / in million IDR (dalam Rp juta / in million (OR (dalam Rp jutal / in milan IDR
Pelunasan
batu Mengambil Alih jan Tea pelunasan | Mengamba Alih Mendanai Mengambil Mendanai
Jenis Penawaran we Hak Tagih ni Re prana Hak Tagih Belanja Modal Su Alih Hak Tagih Belanja Modal
No af ea eni Baya Pena ea $ P3 Perjanjian | Mendanai | mendanai | “ Saba : Men Mendanai | Mendanai San F Perjanjian | Mendanai | Mendanai | 208 Uvicket | eng Mendanai | Mendanai bifoegrena Perjanjian | Mendanai | Mendanai | 20 victet | yana Mendanai | Mendanai
Type of Pubik Afoctive Date Pura TR basa wan rang Or) #asittas Modal Kerja petanja Modal)». 5 Pee ak Modal Kerja | Belanja Modal - op fasitas Modal Kerja IgelanjaModall — Motte . uas Modal Kerja | Belanja Modal aji Fasiitas | Modal Kerja IsetanjaModail — Matte Pena ma Modal Kerja | Belanja Modal
Offering aa Pai as 2gf | -emmarang ena ag Dukungan | #erseroan/ | MTI/ FN ia Fa scm/ — Isiowpar r8y/| NN Dukungan | #erseraan/ | amp | converter) see , RI semp Isipmear xag ae Dukungan | #erseroan/ |. mny | converter/ | Ny Po sep Iremeataan ryan 5
Pesan Gp Has para Kena r Pen Induk MTI/ | #undingfar | #undingfor | vesea ii toe | Fendingfor | Funding far Jlumtan/ Totat Induk MTI/ | #undingfar | #undingfor | #undingfor | , far | Funding for | Funding for. |ivmtah/ Totot karate OI Indukmtif | Fundingfar | Fundingfor | Funding for £ tar | Funding for | Funding for Aa
segan sega seneng: ting | te overthe | Working Capital sana saga Working Capital Debate | jean omer ie | Working Capitat Capital unding, Working Capital Tea la war due | Warking Capital Capital na Working Copa
the Public Offering Offering Principal Principal Warking Principal Working Principal Working
Fan Receivables | Coptalofthe | Expenditure | gmeiness Ncapitartap2un | apitalof |Expenditureof R Receivables | Capitatof the | Expenditure Jexpenditure of opal Copitatof | Expendture of kasi aj) #erriobles | Captoloftne | Expenditure erpendtweof|...earawn| Copitatof expendtureof
Wppe Indebtedness | underParent | Campany of MTI Pan ca sem Isi papar 10) debtednes | nderPorent | Company afi | 211 pvicker | Apit sem |sippepar za) btedness Of under Parent | Campany ofmni | 21m psicker | Opa sem |sipppas z2)
Ot Ie pportFaciy Sea ame Ie ppartFocity Motte deCampany |. part Matte
Company caca Company Company 7
of MTI Para af Ti Converter) Facility af MTI Converter)
May 2023
1 2 3 4 s 6 7 8 9 10 1 » 13 14 1s 16 1 18 19 20 » 2 2 2 2s 26 2 2 29 30 31 2 33
Penawaran Umum
1 |perdana Saham / 18 Aprl 2023 9,182,250 247,462 ngas7as| 4461780 449,910 224,716 mogaan | oo 111776 625,43 536,087 maan) asaa7as) 4461750 449,910 267,599 729,500) 1117976 24413 227,599 1,998,747 (az, 252) saca1 o 1022 208,400 mara) — sagoa1
Initat Public Offering
Jumlah / Totai 5,182,250 247,262 asa,7an | oo 4461.750 229,310 222,716 mogi | oo 1117976 625,435 536087 Tia yaa | owasaras| oo 4461750 229310 267,559 Tassoo| 1117076 C24A13 227,599 1,008.7a7 (azan Sae31 0 1022 200,288 maya | oo se0a1
Jakarta, 15 Januari / January 2024
PT Merdeka Battery Materials Tbk
n 8
Deny Greviartana Wijaya
Sekretaris Perusahaan / Corporate Secretary
Paraf/Initial :

Page 3 OCR 0.905
P3

MERDEKA
BATTERY

MATERIALS

Lampiran / Appendix 2

PT Merdeka Battery Materials Tbk
Treasury Tower 69"" Floor

District 8 SCBD Lot. 28

Jl Jenderal Sudirman Kav. 52-53
South Jakarta 12190, Indonesia

Realisasi Penggunaan Dana menurut Prospektus / Realization of the Appropriation of Funds in accordance with Prospectus
untuk Periode sampai dengan 31 Des 2023 / for the Period until 31 Dec 2023

T 62.21.3952 5581

F 462213952 5582

E investor.relations@merdekabattery.com
www.merdekabattery.com

Keterangan /
Description

Rencana (Rp)/
Plan (IDR)

Realisasi (Rp) /
Realization (IDR)

Lebih / (Kurang) (Rp)
More / (Less) (IDR)

Penjelasan /
Description

1. Isekitar 53,096 akan digunakan oleh Perseroan untuk pembayaran lebih awal untuk seluruh pokok utang yang timbul berdasarkan Perjanjian Fasilitas Berjangka US$300.000.000, yang akan dibayarkan kepada MDKA dan ING
Bank N.V., cabang Singapura (“ING Bank”), masing-masing sebesar US$225.000.000 dan US$75.000.000, melalui ING Bank sebagai Agen. MDKA merupakan Afiliasi Perseroan sedangkan ING Bank bukan merupakan Afiliasi
Perseroan.

(Approximately 53.04 by the Company for early repayment of the outstanding principal Indebtedness under the US$300,000,000 Facility Agreement, which will be paid to MDKA and ING, amounting to US$225,000,000 and
IUS$75,000,000, respectively, through ING as Agent. MDKA is an affiliate of the Company and ING is not an affiliate of the Company.

2,461,750,000,000

2,461,750,000,000

Konversi Rupiah ke US$ dilakukan beberapa kali dengan rata:
(rata kurs US$1 - Rp14.872,5.

Conversion of Rupiah to US$ was carried out multiple times
Iwith an average exchange rate of USS1 - IDR14,872.5.

2. Isekitar 6,026 akan digunakan oleh Perseroan untuk mengambil alih hak tagih sebesar US$30.000.000 atau setara Rp447,4 miliar yang timbul dari Perjanjian Fasilitas Dukungan Induk tanggal 23 Agustus 2022 yang diberikan 429,910,000,000 249,910,000,000 "Ikonversi Rupiah ke US$ dilakukan dengan kurs USS1 -
loleh MDKA kepada PT Merdeka Tsingshan Indonesia (“MTI”), sehingga Perseroan, setelah pengalihan hak tagih dari MDKA, akan memiliki hak tagih kepada MTI sebesar US$30.000.000 atau setara Rp447,4 miliar dengan IRp14.997,0.
Isyarat dan ketentuan yang sama dengan Perjanjian Fasilitas Dukungan Induk. |Conversion of Rupiah to US$ use the exchange rate of US$1
lApproximately 6.05 will be used by the Company to take over the receivables amounting to US$30,000,000 or eguivalent to IDR447.4 billian under the Parent Support Facility Agreement dated August 23, 2022 provided by - IDR14,997.0.
IMDKA to MTI, hence the Company will own receivables to MTI amounting to US$30,000,000 or eguivalent to IDR447.4 billion with the same terms and conditions as stipulated in the Parent Support Facility Agreement.
3. Isekitar 2,096 akan digunakan oleh Perseroan untuk modal kerja antara lain untuk biaya karyawan, biaya jasa profesional dan biaya keuangan. 224,715,853,937 267,598,851,082 (42,882,997,145Jl Dana hasil penawaran umum perdana saham yang berasal
lApproximately 2.0X will be used by the Company for working capital purposes, including among others, salary and wage costs, professional service fees and financial fees. (dari saham baru dikarenakan kelebihan pemesanan pada
|penjatahan terpusat sebesar Rp46,0 miliar dialokasikan
kepada item penggunaan dana ini.
The proceeds from the initial public offering which came
from new shares due to oversubscriptions on poling
jallotment of IDR46.0 billion were allocated to this item of
use of proceeds .
2. (Sekitar 9,0x akan dipinjamkan kepada MTI yang selanjutnya akan digunakan untuk membiayai sebagian kebutuhan belanja modal yang timbul dari pembangunan Proyek AIM 1, yang dijadwalkan akan memulai produksi '804,130,945,663 749,500,000,000 54,630,945,663
pada pertengahan kedua tahun 2023.
lApproximately 9.02 will be lent by the Company to MTI for part of the capital expenditure related to the construction of the AIM I Project, which is scheduled to start production in the second half of 2023.
5. sekitar 9,096 akan digunakan oleh Perseroan untuk pembayaran kembali atas pokok utang yang telah dicairkan sebesar US$75.000.000 berdasarkan Perjanjian Pinjaman US$175.000.000 yang berlaku efektif pada tanggal 25 1,117,975,945,663 1,117,975,945,663 0
IMei 2023 yang akan dibayarkan kepada MDKA. MDKA merupakan Afiliasi Perseroan yakni pengendali Perseroan.
lApproximately 9.0X will be used by the Company for repayment of the disbursed debt principal amounting to US$75,000,000 based on the US$175,000,000 Loan Agreement Facility which is effective on May 25 2023
which will be paid to MDKA. MDKA is an Affiliate af the Company, the controller of the Company.
6. Juan (li) sekitar 7,096 akan digunakan untuk modal kerja, meliputi antara lain pembelian bahan baku utama, bahan baku pembantu, biaya listrik, serta biaya karyawan. 625,435,179,960 624/413,183,700 1,021,996,260
land (ii) approximately 7.0 for working capital, including among others, the purchase of main raw materials, auxiliary raw materials, electricity costs, as well as salary and wage costs.
7. Isekitar 6,096 akan dipinjamkan kepada SCM yang selanjutnya akan digunakan untuk modal kerja, meliputi antara lain biaya karyawan, biaya jasa profesional, pembayaran royalti ke kas negara, biaya pengangkutan dan 536,087,297,109 327,599,377,200 208,487,919,909
bongkar muat, biaya pemeliharaan dan perbaikan, serta biaya penambangan.
Lapproximately 6.0X will be lent to SCM for working capital purposes, including among others, salary and wage costs, professional service fees, royalty fees to the state treasury, transportation and loading and unloading
Icosts, maintenance and repair costs as well as mining costs.
8. ISisanya akan dilakukan untuk penyetoran modal kepada PT Merdeka Industri Mineral (“MIN”) yang selanjutnya akan digunakan untuk penyetoran modal dan pemberian pinjaman kepada PT Sulawesi Industri Parama 714,783,062,811 2 714,783,062,811
(“SIP”) masing-masing sebesar SOX. SIP akan menggunakan dana tersebut untuk membiayai sebagian kebutuhan belanja modal yang timbul dari pembangunan fase pertama dari pabrik HPAL pertama yang berkapasitas 60
Ikilo ton per tahun (“ktpa”) (“HPAL 1a”) di IKIP. Proyek ini merupakan bagian dari strategi usaha Grup MBM agar semakin terlibat dalam rantai nilai bahan baku strategis dan ke depannya dalam rantai nilai baterai
kendaraan bermotor listrik.
The remainder will be utilized for capital injection to MIN, which will then be used for capital injection and provision of loan to PT Sulawesi Industri Parama ("SIP") for 50X respectively. SIP will use such fund to finance
Ipart of the capital expenditure needs arising from the construction Of our first HPAL factary with capacity of 60 ktpa ("HPAL La") at IKIP. This project Is part af business strategy of MBM Group to be more involved in the
Istrategic materials value chain and in the future in the EV battery value chain.
Jumlah / Total 8,934,788,285,143 7,998,747,357,645 936,040,927,497

Page 4 OCR 0.875
Ls

MERDEKA
BATTERY

MATERIALS

Lampiran / Appendix 3

PT Merdeka Battery Materials Tbk

Treasury Tower 69” Floor
District 8 SCBD Lot. 28

JL Jender

South Jakarta 12190, Indone:

Sudirman Kav

T 4622213952 5581
F 462213952 5582

E investor.relations@merdekabattery.com

www.merdekabattery.com

Rincian Biaya Pelaksanaan Penawaran Umum Perdana Saham / Detail of Cost Incurred from the Initial Public Offering

untuk Periode sampai dengan 31 Des 2023 / for the Period until 31 Dec 2023

No. Jenis Biaya Penawaran Umum Perdana Saham / Rencana (Rp) / Realisasi (Rp) / Lebih/ (Kurang) (Rp) /
" Type of Cost of Initial Public Offering Plan (IDR) Realization (IDR) More / (Less) (IDR)
1. (Biaya Jasa Penjaminan / 0.40076| 36,728,999,682 34,508,535,461 2,220,464,221
Underwriting Fee
2. IBiaya Jasa Penyelenggaraan / 0.40056| 36,728,999,682 38,128,200,000 (1,399,200,318)
Management Fee
3. JBiaya Jasa Penjualan / 0.40056| 36,728,999,682 34,508,196,339 2,220,803,343
Selling Fee
4.  |Biaya Insentif Discretionary/ 1.05096 96,413,624,165 53,952,003,041 42,461,621,124
Discretionary Incentive Fee
5. Biaya Jasa Profesi Penunjang Pasar Modal / 0.258X| 23,690,204,795 22,329,545,598 1,360,659,197
Capital Market Supporting Profession Fee
6. Biaya Jasa Lembaga Penunjang Pasar Modal / 0.00496| 367,289,997 215,820,000 151,469,997
Capital Market Supporting Institution Fee
7.  |Biaya Lain-lain / 0.18396| 16,803,517,355 40,776,922,334 (23,973,404,980)
Other Fees
Jumlah / Total 2.69546| 247,461,635,357 224,419,222,773 23,042,412,584

Page 5 OCR 0.879
(Ad

MERDEKA
BATTERY

MATERIALS

Lampiran / Appendix 4

PT Merdeka Battery Materials Tbk

Treasury Tower 69" Floor
District 8 SCBD Lot. 28

Jl Jenderal Sudirman Kav. 52-53
South Jakarta 12190, Indonesia

T 162.21.3052 5581
F 4622130
E investorrelation:

www.rnerdekabati

5582

merdekabatterycom

ry.com

Rincian Sisa Dana yang Berasal dari Dana Hasil Penawaran Umum / Detail of Remaining Fund from the Public Offering
untuk Periode sampai dengan 31 Des 2023 / for the Period until 31 Dec 2023

"3 Nama Bank 7 Nilai dalam satuan Rupiah") / Periode / Tingkat Suku Bunga / Hubungan dengan Emiten /
: Bank's Name Amount in Rupiah ") Period Interest Rate Relationship with Issuer
1 (Saldo Bank dalam bentuk Giro Rupiah dan USD:
Bank's balance is in the form of Giro in IDR and USD:
Bank UOB Indi ji
Ek idenesaf Rp 562,902,381,343| 31 Des 2023/ 4.254 Pihak ketiga /
UOB Indonesia
HankOBENPI Rp 400,002,250,335 31 Dec 2023 4.509 (Third party
OCBC NISP
Jumlah / Total Rp 962,904,631,678

Catatan / Note :

Termasuk dana yang belum digunakan untuk biaya pelaksanaan Penawaran Umum Perdana Saham.
Including allocated fund which haven't been used for cost incurred from the Initial Public Offering.

File

File Open PDF
Source IDX
Size1.57 MB
Published15 Jan 2024
Pages5
Characters16,188
Text sourceOCR
OCR confidence0.835

Names mentioned 9 people and organisations named in the text · linked when the evidence is strong

linked org Merdeka Battery Materials Tbk p.1 ×30
linked person Deny Greviartana Wijaya p.2
possible org PT Bursa Efek Indonesia p.1
unresolved org Otoritas Jasa Keuangan Republik Indonesia p.1
unresolved person Deny Greviartana ya · Sekretaris Perusahaan / Corporate Secretary p.1
unresolved org PT Merdeka Tsingshan Indonesia p.3
unresolved org PT Merdeka Industri Mineral p.3
unresolved org PT Sulawesi Industri Parama p.3 ×2
unresolved org Bank UOB Indi p.5

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result