Skip to content
Back to announcement

20240103_NICL_Laporan Bulanan Aktivitas Eksplorasi_31563967.pdf

Other Text extracted NICL

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 4

Page 1
Go To English Page

 Nomor Surat                               001/PAM-Mineral/TBK/JKT/Corsec/I/2024

 Nama Perusahaan                           PT PAM Mineral Tbk

 Kode Emiten                               NICL

 Lampiran                                  0

 Perihal                                   Laporan Bulanan Aktivitas Eksplorasi

Perseroan melaporkan aktivitas eksplorasi untuk JAN 2024 Sebagai Berikut :

                                                                                           Hasil aktivitas
      Nama              Area yang
                                         Total biaya yang   Pihak yang       Metode         eksplorasi
   Perusahaan/          dilakukan                                                                          Rencana tindak
                                               telah        melakukan     pengujian dan    hingga akhir
      Anak               aktivitas                                                                             lanjut
                                           dikeluarkan      eksplorasi    pemilihan area      periode
   perusahaan           eksplorasi
                                                                                           pelaporan ini
       PT.               Blok Afu,        658.152.000           PT.        Metode Full      Sudah selesai    Melanjutkan
   INDRABAKTI           Cempedak,                           INDRABAKTI    Coring dengan 794 titik (Total     drilling di titik
     MUSTIKA          Cendana, Jati,                          MUSTIKA     infill spasi 50, Meter: 12.028      selanjutnya
                        Karematu,                                          dan evaluasi         m)
                     Pinus, Tambari,                                     hasil blok model
                     Kondole, Komia,                                     exixsting drilling
                      Kolaka, Silae,                                            spasi
                           Kuma,                                         sebelumnya 100
                     Mangrove, Bitti,                                         dan 200
                      Nsili-Nsili dan
                       Longori (Infill
                       Drilling, spc.
                     100, 50 dan 25)
     PT PAM           Blok Kartni B,       94.180.000        PT PAM         Metode Full     Sudah selesai    Melanjutkan
     MINERAL          BCL A, BCL B,                          MINERAL      Coring dengan 411 titik (Total     drilling di titik
                      Raisa, Syarini,                                      infill spasi 50 Meter: 2.003,50    selanjutnya
                        Tiara (Infill                                       dan 25dan            m)
                     Drilling, spc. 25                                    evaluasi hasil
                          dan 50)                                           blok model
                                                                         exixsting drilling
                                                                                 spasi
                                                                         sebelumnya 100
                                                                              dan 200

 Demikian untuk diketahui.


 Hormat Kami,
 PT PAM Mineral Tbk




 Suhartono

 Corporate Secretary




 PT PAM Mineral Tbk
 Jl. Batujajar No. 37
 Telepon : (021) 3521669, Fax : , www.pammineral.co.id



 Nama Pengirim                             Suhartono
Page 2
Jabatan                          Corporate Secretary
Tanggal dan Waktu                03-01-2024 14:01




   Dokumen ini merupakan dokumen resmi PT PAM Mineral Tbk yang tidak memerlukan tanda tangan karena
dihasilkan secara elektronik oleh sistem pelaporan elektronik. PT PAM Mineral Tbk bertanggung jawab penuh atas
                                    informasi yang tertera didalam dokumen ini.
Page 3
Go To Indonesian Page

 Letter / Announcement No.              001/PAM-Mineral/TBK/JKT/Corsec/I/2024

 Issuer Name                            PT PAM Mineral Tbk

 Issuer Code                            NICL

 Attachment                             0

 Subject                                Monthly Exploration Activities Report

The Company reports exploration activities for JAN 2024 as follows :

 Company name/ Exploration                  Total cost     Parties     Testing methods    Results of     Follow up plan
   Subsidiary  activities area               incurred    exploration    and selection     exploration
                                                                             area       activities until
                                                                                        the end of the
                                                                                       reporting period

       PT.              Blok Afu,       658,152,000          PT.         Metode Full      Sudah selesai    Melanjutkan
   INDRABAKTI          Cempedak,                         INDRABAKTI     Coring dengan 794 titik (Total     drilling di titik
     MUSTIKA         Cendana, Jati,                        MUSTIKA      infill spasi 50, Meter: 12.028      selanjutnya
                       Karematu,                                         dan evaluasi         m)
                    Pinus, Tambari,                                    hasil blok model
                    Kondole, Komia,                                    exixsting drilling
                     Kolaka, Silae,                                           spasi
                          Kuma,                                        sebelumnya 100
                    Mangrove, Bitti,                                        dan 200
                     Nsili-Nsili dan
                      Longori (Infill
                      Drilling, spc.
                    100, 50 dan 25)
     PT PAM          Blok Kartni B,     94,180,000        PT PAM          Metode Full     Sudah selesai    Melanjutkan
     MINERAL         BCL A, BCL B,                        MINERAL       Coring dengan 411 titik (Total     drilling di titik
                     Raisa, Syarini,                                     infill spasi 50 Meter: 2.003,50    selanjutnya
                       Tiara (Infill                                      dan 25dan            m)
                    Drilling, spc. 25                                   evaluasi hasil
                         dan 50)                                          blok model
                                                                       exixsting drilling
                                                                               spasi
                                                                       sebelumnya 100
                                                                            dan 200

 Thus to be informed accordingly.


 Respectfully,
 PT PAM Mineral Tbk




 Suhartono

 Corporate Secretary




 PT PAM Mineral Tbk
 Jl. Batujajar No. 37
 Phone : (021) 3521669, Fax : , www.pammineral.co.id



 Sender Name                            Suhartono
Page 4
Function                            Corporate Secretary

Date and Time                       03-01-2024 14:01




     This is an official document of PT PAM Mineral Tbk that does not require a signature as it was generated
    electronically by the electronic reporting system. PT PAM Mineral Tbk is fully responsible for the information
                                             contained within this document.

File

File Open PDF
Source IDX
Size0.01 MB
Published3 Jan 2024
Pages4
Characters7,603
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 0 people and organisations named in the text · linked when the evidence is strong

The name pass has not read this document yet.

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result