Skip to content
Back to announcement

20231227_KEEN_Laporan Informasi dan Fakta Material_31562372.pdf

Other Text extracted KEEN

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 4

Page 1
Go To English Page

 Nomor Surat                           84/KEL-Corsec/XII/2023

 Nama Perusahaan                       PT Kencana Energi Lestari Tbk.

 Kode Emiten                           KEEN

 Lampiran                              1
                                       Perolehan atau kehilangan kontrak penting
 Perihal


Dengan ini kami untuk dan atas nama perusahaan menyampaikan Laporan Informasi atau Fakta Material sebagai
berikut:

 Nama Emiten atau Perusahaan Publik            PT Kencana Energi Lestari Tbk.

 Bidang Usaha                                  Menjalankan usaha jasa dan ketenagalistrikan melalui anak
                                               perusahaan


 Telepon                                       +62.21.5890.0791

 Faksimili                                      +62.21.386.7686

 Alamat Surat Elektronik (email)               corporate.secretary@kencanaenergy.com


 Tanggal Kejadian                              21 Desember 2023
 Jenis Informasi atau Fakta Material           Perolehan atau kehilangan kontrak penting



 Uraian Informasi atau Fakta Material          PT Kencana Energi Lestari Tbk melalui anak perusahaan
                                               tidak langsung yaitu PT Tiara Tirta Energi telah
                                               menandatangani Perjanjian Jual Beli Tenaga Listrik dengan
                                               PT Perusahaan Listrik Negara Persero.

                                               Dengan ditandatanganinya PJBL tersebut, PLN memberikan
                                               kepercayaan kepada Perseroan untuk membangun dan
                                               mengoperasikan PLTM Salu Noling dengan kapasitas 10 MW
                                               dan menjual listrik hasil produksinya kepada PLN untuk jangka
                                               waktu 25 tahun sejak PLTM Salu Noling beroperasional.
Page 2
Dampak kejadian, informasi atau fakta       Kegiatan Operasional
material tersebut terhadap kegiatan         Perolehan kontrak penting ini membawa dampak yang sangat
operasional, hukum, kondisi keuangan,       positif bagi operasional Perseroan.
atau kelangsungan usaha Emiten atau
Perusahaan Publik                           Perseroan akan segera memulai konstruksi PLTM Salu Noling.

                                            Setelah pembangunan selesai, akan meningkatkan kapasitas
                                            terpasang Perseroan dan meningkatkan hasil produksi
                                            Perseroan.

                                            Hukum
                                            Tidak ada dampak.

                                            Kondisi Keuangan Perseroan
                                            Perolehan kontrak penting ini membawa dampak yang sangat
                                            positif bagi keuangan Perseroan karena akan meningkatkan
                                            pendapatan Perseroan terutama dari construction revenue.

                                            Kelangsungan Usaha Perseroan
                                            Perolehan kontrak penting ini membawa dampak yang sangat
                                            positif bagi kelangsungan usaha Perseroan karena menambah
                                            portfolio proyek Perseroan dan kelangsungan usaha
                                            Perseroan semakin terjaga dengan durasi kontrak yang
                                            panjang.


Demikian untuk diketahui.


Hormat Kami,
PT Kencana Energi Lestari Tbk.




Wilson Maknawi

Wakil Direktur Utama




PT Kencana Energi Lestari Tbk.
Kencana Tower Lantai 11, Kebon Jeruk Business Park, Jl. Raya Meruya Ilir No.88,
Telepon : +62.21.5890.0791, Fax : +62.21.386.7686, www.kencanaenergy.com



Nama Pengirim                     Wilson Maknawi

Jabatan                           Wakil Direktur Utama
Tanggal dan Waktu                 27-12-2023 14:52

Lampiran                          1. Perolehan Kontrak Penting TTE.pdf


  Dokumen ini merupakan dokumen resmi PT Kencana Energi Lestari Tbk. yang tidak memerlukan tanda tangan
karena dihasilkan secara elektronik oleh sistem pelaporan elektronik. PT Kencana Energi Lestari Tbk. bertanggung
                          jawab penuh atas informasi yang tertera didalam dokumen ini.
Page 3
Go To Indonesian Page

 Letter / Announcement No.            84/KEL-Corsec/XII/2023

 Issuer Name                          PT Kencana Energi Lestari Tbk.

 Issuer Code                          KEEN

 Attachment                           1

 Subject                              Acquisition or Lost of Material Contract


The company hereby announce the Material Information or Facts Report as follows

 Name of Issuer or Public Company              PT Kencana Energi Lestari Tbk.

 Business Activities                           Menjalankan usaha jasa dan ketenagalistrikan melalui anak
                                               perusahaan

 Telephone                                     +62.21.5890.0791

 Faximile                                      +62.21.386.7686

 Email Address                                 corporate.secretary@kencanaenergy.com


 Date of Event                                 21 December 2023

                                               Acquisition or Lost of Material Contract
 Type of Material Information or Facts

 Description of Material Information or        PT Kencana Energi Lestari Tbk through its indirect subsidiary,
 Facts                                         namely PT Tiara Tirta Energi, has signed a Power Purchase
                                               Agreement with PT Perusahaan Listrik Negara Persero.

                                               By signing the PPA, PLN has given the Company its
                                               endorsement to build and operate the Salu Noling Mini Hydro
                                               Power Plant with a capacity of 10 MW and to sell the electricity
                                               produced to PLN for a period of 25 years after Salu Noling Mini
                                               Hydro Powerplants commercial operation date.
 Impact of event, material information or      Operational Activities
 facts towards Issuers or Public               The acquisition of this important contract has had a very
 Company’s operational activities, legal,      positive impact on the Company's operations.
 financial condition, or going concern
                                               The company will soon start construction of the Salu Noling
                                               Mini Hydro Power Plant.

                                               Once the construction is completed, it will increase the
                                               Company's installed capacity and increase the Company's
                                               production output.

                                               Law
                                               No impact.

                                               Company Financial Condition
                                               Obtaining this important contract has a very positive impact on
                                               the Company's finances because it will increase the
                                               Company's income, especially from construction revenue.

                                               Company Business Continuity
                                               Obtaining this important contract has a very positive impact on
                                               the Company's business continuity because it adds to the
                                               Company's project portfolio and the Company's business
                                               continuity is increasingly maintained with the long contract
                                               duration.


Thus to be informed accordingly.
Page 4
Respectfully,
PT Kencana Energi Lestari Tbk.




Wilson Maknawi

Wakil Direktur Utama




PT Kencana Energi Lestari Tbk.
Kencana Tower Lantai 11, Kebon Jeruk Business Park, Jl. Raya Meruya Ilir No.88,
Phone : +62.21.5890.0791, Fax : +62.21.386.7686, www.kencanaenergy.com



Sender Name                         Wilson Maknawi

Function                            Wakil Direktur Utama

Date and Time                       27-12-2023 14:52

Attachment                         1. Perolehan Kontrak Penting TTE.pdf


     This is an official document of PT Kencana Energi Lestari Tbk. that does not require a signature as it was
 generated electronically by the electronic reporting system. PT Kencana Energi Lestari Tbk. is fully responsible for
                                    the information contained within this document.

File

File Open PDF
Source IDX
Size0.01 MB
Published27 Dec 2023
Pages4
Characters9,022
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 0 people and organisations named in the text · linked when the evidence is strong

The name pass has not read this document yet.

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result