Skip to content
Back to announcement

20231106_ELSA_Laporan Informasi dan Fakta Material_31505701.pdf

Other Text extracted ELSA

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 6

Page 1
Go To English Page

 Nomor Surat                           L9.013C-2023.147

 Nama Perusahaan                       Elnusa Tbk

 Kode Emiten                           ELSA

 Lampiran                              2
                                       Siaran Pers - Elnusa Berperan Aktif dalam Project Penyisipan Segmental
 Perihal
                                       Partial Replacement Mai


Dengan ini kami untuk dan atas nama perusahaan menyampaikan Laporan Informasi atau Fakta Material sebagai
berikut:

 Nama Emiten atau Perusahaan Publik            Elnusa Tbk

 Bidang Usaha                                  Jasa Energi



 Telepon                                       (021) 788-30850

 Faksimili                                     (021) 788-30883

 Alamat Surat Elektronik (email)               corporate@elnusa.co.id


 Tanggal Kejadian                              06 November 2023
 Jenis Informasi atau Fakta Material           Siaran Pers - Elnusa Berperan Aktif dalam Project Penyisipan
                                               Segmental Partial Replacement Mai
Page 2
Uraian Informasi atau Fakta Material   Jakarta, 6 November 2023 - PT Elnusa Tbk (Elnusa)
                                       Perusahaan jasa energi terkemuka yang tergabung dalam
                                       Subholding Upstream Pertamina, turut serta berperan aktif
                                       dalam Proyek Penyisipan (Segmental Partial Replacement)
                                       Main Oil Line XAP ke MGS Balongan, yang terletak di wilayah
                                       Kerja X-Ray Jatibarang Field Lepas PT Pertamina EP Pantai
                                       Laut Jawa, Kabupaten Indramayu, Provinsi Jawa Barat.
                                       Pekerjaan ini merupakan upaya menjaga kehandalan asset
                                       untuk menunjang produksi, dilakukan mulai dari 4 April 2023
                                       sampai dengan 16 Agustus 2023 diluar fase Persiapan dan
                                       Engineering. Atas rampungnya pekerjaan tersebut dan
                                       sebagai wujud rasa syukur, Elnusa bersama dengan PT
                                       Pertamina EP selaku pemilik proyek menggelar closing
                                       seremoni Main Oil Line XAP, Senin (06/11).

                                       Dalam pekerjaan ini Elnusa melaksanakan lingkup pekerjaan
                                       mulai dari Masa Persiapan Kerja & Perijinan, Project
                                       Management Team, Detail Teknis, Survey Pre-Installation,
                                       Pengadaan, Konstruksi, Sampel Pipa, Commissioning & Start-
                                       Up (Pengujian dan Fase Awal), Post Lay Survey Survey Paska
                                       Pekerjaan, dan Sertifikasi. Dari Aspek Kinerja HSSE, Elnusa
                                       juga menorehkan catatan positif dalam proyek ini dengan
                                       mencatatkan 0 Lost Time Incident (LTI) dengan total 832 jam
                                       kerja selamat dan 426.151 total Jam kerja tanpa kecelakaan.

                                       Direktur Operasi Elnusa Charles Harianto Lumbantobing
                                       mengatakan bahwa proyek ini merupakan langkah strategis
                                       bagi Elnusa sebagai Perusahaan jasa energi terkemuka yang
                                       berkomitmen untuk memberikan solusi total. 'Kami memahami
                                       sepenuhnya bahwa proyek ini memiliki dampak signifikan pada
                                       integritas dan kelangsungan produksi di lapangan X-Ray.
                                       Dengan tekad dan dedikasi, kami mampu menyelesaikan
                                       issue integritas yang telah menyebabkan Lost Production
                                       Opportunity (LPO),' kata Charles.

                                       Lebih lanjut Charles menambahkan, 'Elnusa telah
                                       menjalankan seluruh cakupan pekerjaan dengan komitmen
                                       tinggi. Kami siap untuk terus berperan aktif dalam proyek-
                                       proyek berikutnya yang akan memajukan industri energi di
                                       Indonesia'.

                                       Sementara itu, General Manager PT Pertamina EP Zona 7,
                                       Afwan Daroni, mengapresiasi kinerja dan dedikasi seluruh tim
                                       baik dari Pertamina EP dan Elnusa yang sudah
                                       menyelesaikan project ini dengan tetap mengutamakan aspek
                                       keselamatan kerja. 'Melalui sinergi yang luar biasa antar anak
                                       usaha Pertamina ini, kami berharap dapat meningkatkan
                                       kehandalan pipa alir XAP - MGS Balongan agar dapat
                                       meningkatkan produksi Migas Nasional,' pungkas Afwan.

                                       Sekilas Elnusa (IDX: ELSA)
                                       Elnusa merupakan anak perusahaan PT Pertamina Hulu
                                       Energi (PHE) yang tergabung dalam Subholding Upstream
                                       Pertamina. Sebagai perusahaan solusi total jasa energy,
                                       Elnusa memiliki kompetensi inti pada jasa hulu migas, jasa
                                       distribusi dan logistik energi dan jasa penunjang. Lini jasa hulu
                                       migas meliputi jasa Geoscience & Reservoir (land, transition
                                       zone & marine serta data processing), jasa pengeboran &
                                       pemeliharaan lapangan migas (drilling & workover), jasa
                                       engineering, procurement, construction & operation
                                       maintenance (EPC-OM). Lini jasa distribusi dan logistik energi
                                       meliputi jasa transportasi BBM, pengelolaan depot, hingga
                                       penjualan chemical. Lini jasa penunjang meliputi jasa marine
Page 3
                                            support, fabrikasi, hingga manajemen data. Saat ini, Elnusa
                                            melayani perusahaan migas nasional maupun internasional,
                                            antara lain Pertamina Group, British Petroleum, Conoco
                                            Phillips, Soco Exploration (Vietnam) Ltd dan lain-lain. Elnusa
                                            terdaftar pada Bursa Efek Indonesia dengan kode emiten
                                            'ELSA' serta memiliki lima anak perusahaan yang mendukung
                                            kompetensinya. Informasi lebih lanjut dapat diakses pada
                                            www.elnusa.co.id
Dampak kejadian, informasi atau fakta       Tidak Ada
material tersebut terhadap kegiatan
operasional, hukum, kondisi keuangan,
atau kelangsungan usaha Emiten atau
Perusahaan Publik



Demikian untuk diketahui.


Hormat Kami,
Elnusa Tbk




Retnowati

Corporate Governance Specialist




Elnusa Tbk
Graha Elnusa, Jl. TB Simatupang Kav. 1B, Jakarta 12560
Telepon : (021) 788-30850, Fax : (021) 788-30883, www.elnusa.co.id



Nama Pengirim                     Retnowati

Jabatan                           Corporate Governance Specialist
Tanggal dan Waktu                 06-11-2023 16:18

Lampiran                          1. Project Penyisipan Segmental Partial Elnusa.pdf


                                  2. Segmental Partial Replacement Line Project.pdf


Dokumen ini merupakan dokumen resmi Elnusa Tbk yang tidak memerlukan tanda tangan karena dihasilkan secara
  elektronik oleh sistem pelaporan elektronik. Elnusa Tbk bertanggung jawab penuh atas informasi yang tertera
                                               didalam dokumen ini.
Page 4
Go To Indonesian Page

 Letter / Announcement No.           L9.013C-2023.147

 Issuer Name                         Elnusa Tbk

 Issuer Code                         ELSA

 Attachment                          2

 Subject                             Press Release - Elnusa takes an Active Role in the Segmental Partial
                                     Replacement Main Oil Line

The company hereby announce the Material Information or Facts Report as follows

 Name of Issuer or Public Company            Elnusa Tbk

 Business Activities                         Jasa Energi


 Telephone                                   (021) 788-30850

 Faximile                                    (021) 788-30883

 Email Address                               corporate@elnusa.co.id


 Date of Event                               06 November 2023

                                             Press Release - Elnusa takes an Active Role in the Segmental
 Type of Material Information or Facts       Partial Replacement Main Oil Line
Page 5
Description of Material Information or   Jakarta, 6 November 2023 - PT Elnusa Tbk (Elnusa), a leading
Facts                                    energy services company which is part of the Pertamina
                                         Upstream Subholding, is taking an active role in the Main Oil
                                         Line XAP Insertion (Segmental Partial Replacement) Project to
                                         MGS Balongan, which is located in the X-Work area Ray
                                         Jatibarang Field Off PT Pertamina EP Java Sea Coast,
                                         Indramayu Regency, West Java Province. This work is an
                                         effort to maintain asset reliability to support production, carried
                                         out from April 4 2023 to August 16 2023 outside the
                                         Preparation and Engineering phases. For the completion of the
                                         work and as a form of gratitude, Elnusa together with PT
                                         Pertamina EP as the project owner held a closing ceremony
                                         for the XAP Main Oil Line, Monday (06/11).

                                         In this work, Elnusa carries out the scope of work starting from
                                         the Work Preparation & Licensing Period, Project Management
                                         Team, Technical Details, Pre-Installation Survey, Procurement,
                                         Construction, Pipe Samples, Commissioning & Start-Up
                                         (Testing and Initial Phase), Post Lay Survey Survey Post
                                         Employment, and Certification. From the HSSE Performance
                                         Aspect, Elnusa also made a positive record in this project by
                                         recording 0 Lost Time Incidents (LTI) with a total of 832 safe
                                         working hours and 426,151 total working hours without
                                         accidents.

                                         Elnusa Operations Director Charles Harianto Lumbantobing
                                         said that this project is a strategic step for Elnusa as a leading
                                         energy services company that is committed to providing total
                                         solutions. 'We fully understand that this project has a
                                         significant impact on the integrity and continuity of production
                                         at the X-Ray field. With determination and dedication, we were
                                         able to resolve the integrity issue which had caused Lost
                                         Production Opportunity (LPO),' said Charles.

                                         Charles further added, 'Elnusa has carried out the entire scope
                                         of work with high commitment. We are ready to continue to
                                         play an active role in the next projects that will advance the
                                         energy industry in Indonesia.'

                                         Meanwhile, General Manager of PT Pertamina EP Zone 7,
                                         Afwan Daroni, appreciated the performance and dedication of
                                         the entire team from both Pertamina EP and Elnusa who had
                                         completed this project while still prioritizing work safety
                                         aspects. 'Through this extraordinary synergy between
                                         Pertamina's subsidiaries, we hope to increase the reliability of
                                         the XAP - MGS Balongan flow pipe in order to increase
                                         National Oil and Gas production,' concluded Afwan.

                                         About Elnusa (IDX: ELSA)
                                         Elnusa is a subsidiary of PT Pertamina Hulu Energi (PHE)
                                         incorporated in Subholding Upstream Pertamina. As a total
                                         energy services solution company, Elnusa has core
                                         competencies in upstream oil and gas services, supporting
                                         services, and energy distribution and logistics services. The
                                         upstream oil and gas service line includes Geoscience &
                                         Reservoir services (land, transition zone & marine, and data
                                         processing), oil and gas field drilling & maintenance services
                                         (drilling & workover), engineering, procurement, construction &
                                         operation maintenance (EPC-OM) services. Supporting service
                                         lines include marine support services, fabrication, to data
                                         management. The energy distribution and logistics service line
                                         includes fuel transportation services, depot management, and
                                         chemical sales. Currently, Elnusa serves
Page 6
                                               national and international oil and gas companies, including
                                               Pertamina Group, British Petroleum, Conoco Phillips, Soco
                                               Exploration (Vietnam) Ltd, etc. Elnusa is listed on the
                                               Indonesia Stock Exchange with the issuer code 'ELSA' and
                                               has five subsidiaries that support its competence. Detail
                                               information can be accessed at www.elnusa.co.id.
 Impact of event, material information or      No Impact
 facts towards Issuers or Public
 Company’s operational activities, legal,
 financial condition, or going concern




Thus to be informed accordingly.


Respectfully,
Elnusa Tbk




Retnowati

Corporate Governance Specialist




Elnusa Tbk
Graha Elnusa, Jl. TB Simatupang Kav. 1B, Jakarta 12560
Phone : (021) 788-30850, Fax : (021) 788-30883, www.elnusa.co.id



Sender Name                          Retnowati

Function                             Corporate Governance Specialist

Date and Time                        06-11-2023 16:18

Attachment                          1. Project Penyisipan Segmental Partial Elnusa.pdf


                                    2. Segmental Partial Replacement Line Project.pdf


   This is an official document of Elnusa Tbk that does not require a signature as it was generated electronically by
  the electronic reporting system. Elnusa Tbk is fully responsible for the information contained within this document.

File

File Open PDF
Source IDX
Size0.01 MB
Published6 Nov 2023
Pages6
Characters16,638
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 0 people and organisations named in the text · linked when the evidence is strong

The name pass has not read this document yet.

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result