Skip to content
Back to announcement

20231011_ESSA_Penyampaian Bukti Iklan_31447994_lamp4.pdf

Other Text extracted ESSA

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 1

Page 1
The Jakarta Post                                                                                      BUSINESS                                                                         WEDNESDAY October 11, 2023                   5




Indonesia, Netherlands seek                                                                                                                                Work on Tuban
                                                                                                                                                           refinery with
cooperation in solar, tidal power                                                                                                                          Rosneft continues
Solar cells expected to generate 300 MW of power                                                                                                                   Yohana Belinda                 in the project were having diffi-
                                                                                                                                                                                                  culty providing their investment;
                                                                                                                                                           The Jakarta Post/Jakarta               thus, the government intended to
         Divya Karyza                                                                                                                                      The government has said state-         identify potential new investors.
                                                                                                                                                           owned oil and gas company Per-            “As Russia is facing a block-
The Jakarta Post/Jakarta                                                                                                                                   tamina is continuing work on the       ade, economic and geopolitical
Indonesia and the Netherlands                                                                                                                              development of an oil refinery         issues, it may be difficult to con-
aim to strengthen collaboration in                                                                                                                         with Rosneft despite earlier re-       tinue [with Russian investors], so
the development of solar and tidal                                                                                                                         ports about challenges faced by        another partner is being sought,”
power as the countries pledge to                                                                                                                           the Russian partner.                   Airlangga said.
boost bilateral energy cooperation.                                                                                                                            Deputy State-Owned Enter-             When asked whether Rosneft
    Indonesian Energy and Miner-                                                                                                                           prises (SOEs) Minister Kartika         would withdraw from the Tuban
al Resources Minister Arifin Tas-                                                                                                                          Wirjoatmodjo told reporters on         Grass Root Refinery, Airlangga did
rif expressed hope that the agree-                                                                                                                         Monday that while the Tuban            not immediately respond but im-
ment, which will cover technology,                                                                                                                         Grass Root Refinery (GRR) proj-        plied that the government would
transfer of skills and financing,                                                                                                                          ect was still being discussed, Ros-    explore new possible investors.
would help both countries develop                                                                                                                          neft was still Pertamina’s part-          “Russia is affected by geo-
projects in the energy sector.                                                                                                                             ner for the 80 kilobarrel-per-day      politics and facing difficulty in
    Pertamina NRE, the new and                                                                                                                             gasoline project estimated to cost     investing, and surely [Rosneft]
renewable energy arm of state-                                                                                                                             US$13.5 billion, Bisnis reported.      asked the SOEs [Ministry] and
owned oil and gas giant Pertam-                                                                                                                                “We’re still in discussion about   the Energy and Mineral Resourc-
ina, signed on Monday a joint de-                                                                                                                          it because, with Russia’s current      es Ministry to ensure that re-
velopment agreement (JDA) with                                                                                                                             geopolitical situation, there are      fineries are needed, but we [In-
Dutch energy company Hyet So-                                                                                                                              bound to be obstacles. The so-         donesia] can look for another
lar to build a thin-film solar cell                                                                                                                        lution is still under discussion.      investor,” Airlangga said.
factory in Indonesia.                                                                                                                                      Maybe we’ll find a solution in the        Pertamina subsidiary PT Kilang
    The document was signed in                                                                                                                             next six months,” Kartika said.        Pertamina Internasional controls
Jakarta on Monday during the                                                                                                                                   Kartika emphasized that the        55 percent of the joint venture run-
Renewable Energy and Climate                                                                                                                               government and Pertamina had           ning the project, PT Pertamina
Summit Indonesia-Netherlands.                                                                                                                              not decided to seek a new part-        Rosneft Pengolahan dan Petro-
    With an estimated capital ex-                                                                                                                          ner but the geopolitical context       kimia (PRPP), while the remain-
penditure (capex) of US$200 mil-                                                                                                                           would undoubtedly be a factor in       ing 45 percent is held by Rosneft’s
lion, the facility is expected to                                                                                                                          future decisions.                      affiliate in Singapore, Rosneft Sin-
have an annual production ca-                                                                                                                                  “We will look at the geopo-        gapore, according to PRPP website.
pacity for solar cells that can                                                                                          Courtesy of Netherlands Embassy   litical situation and the finan-          Several Western countries are
generate 300 megawatts (MW) of        Bilateral deal: Netherlands Climate Envoy Jaime de Bourbon de Parme (left), Dutch Ambassador to Indo-                cial strength for the investment       shunning or have even banned
power.                                nesia Lambert Grijns (center) and Energy and Mineral Resources Minister Arifin Tasrif pose for a photo on            needs,” Kartika said.                  direct crude oil imports from
    Thin-film solar panels are        Monday, at the Renewable Energy and Climate Summit Indonesia-Netherlands held in Jakarta.                                Tempo, citing PT Kilang Per-       Russia following the Russian in-
lighter and more flexible than                                                                                                                             tamina Internasional (KPI) cor-        vasion of Ukraine in early 2022,
conventional photovoltaic (PV)        who face difficulties accessing       (PJB), a subsidiary of PLN, to es-   vest $12 billion to meet its target       porate secretary Hermansyah Y.         though the European Union re-
panels. They are generally easier     fossil fuels. But these people are    tablish a joint venture called       of generating 10 gigawatts (GW)           Nasroen, reported that Pertam-         mains divided on the issue.
to install and transport, but less    also lucky as they have the poten-    Tidal Bridge Indonesia (TBI) and     of electricity from new and re-           ina was continuing its partner-           Sanctions imposed on Rosneft
efficient in producing electricity.   tial to access renewable energy.      set up Indonesia’s first tidal en-   newable energy sources by 2026.           ship with Rosneft on the project.      are targeted at access to financ-
    The two companies signed a        It’s just a matter of how we can      ergy facility.                          Pertamina’s 10 GW target con-              “Currently, the Tuban Grass        ing, technology and refinery-
memorandum of understanding           [harness that potential],” he said.      TBI will first build the Pan-     sists of gas-to-power, renewable          Root Refinery is still in the pro-     building services, Bisnis reported
(MoU) in April last year to estab-       In 2018, state-owned electric-     casila Palmerah Bridge spanning      energy—including geothermal—              cess of preparing the final invest-    on Sept. 15.
lish a PV foil manufacturing busi-    ity company PLN and Dutch con-        810 meters from Flores Island to     and other new initiatives, such as        ment decision [FID] document.             Tutuka Ariadji, the Energy and
ness in Indonesia.                    sortium Tidal Bridge BV signed        Adonara Island, which will later     electric vehicles (EVs) and hydro-        Other preparations are also un-        Mineral Resources Ministry’s oil
    In the initial phase, Pertamina   an agreement to conduct a fea-        be integrated with five tidal tur-   gen pilot projects.                       derway for the selection of an en-     and gas director general, told the
NRE and Hyet Solar ran a pilot        sibility study to build what has      bines on the Larantuka Strait in        The renewable energy busi-             gineering, procurement and con-        paper on the same day that the
project to build a small-scale so-    been billed as the world’s largest    East Flores regency.                 ness is expected to contribute 3          struction [EPC] contractor for the     ministry had set a target to com-
lar PV foil installation.             tidal power facility in Flores.          Each turbine will have an in-     GW of electricty. From this busi-         Tuban Grass Root Refinery proj-        plete the FID stage of the nation-
    Jakarta and the Hague will also      The consortium, comprised of       stalled capacity of 16 MW, while     ness segment, solar power, bio-           ect to support the construction        al strategic project next year.
develop a tidal power plant in        construction engineering com-         the actual electricity generated     gas-fueled power plants, smart            phase,” he said on Saturday.              He added that the sanctions
Flores, East Nusa Tenggara, ac-       pany Strukton International and       will only reach 6 MW, resulting in   grids and other new and renew-                According to CNBC Indonesia,       imposed against Russia had no
cording to Arifin.                    private equity firm Dutch Expan-      a combined power generation of       able energy power plants are pro-         Coordinating Economic Minis-           direct impact on Rosneft and ex-
    “The establishment is primar-     sion Capital (DEC), will team up      30 MW.                               jected to contribute 1.9 GW of the        ter Airlangga Hartarto had stated      pressed confidence that the proj-
ily aimed at supporting people        with PT Pembangkitan Jawa Bali           Pertamina says it needs to in-    total 3 GW.                               last week that Russian investors       ect could be completed.

File

File Open PDF
Source IDX
Size6.68 MB
Published11 Oct 2023
Pages1
Characters13,839
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 0 people and organisations named in the text · linked when the evidence is strong

The name pass has not read this document yet.

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result