Skip to content
Back to announcement

20260310_RMKO_Public Expose_32052971_lamp1.pdf

Other Text extracted RMKO

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 29

Page 1
 CORPORATE
PRESENTATION
4Q 2025 PERFORMANCE
PT Royaltama Mulia Kontraktorindo Tbk

Service Excellence for the Mining Industry




                                             1
Page 2
                        DISCLAIMER
This presentation material was prepared by PT Royaltama Mulia Kontraktorindo
Tbk. (“RMKO”/“Company”) and has not been independently verified. No
representation or warranty, express or implied, is made and no reliance is made
on the accuracy or completeness of the information presented or contained in
this presentation material. The Company and its affiliated companies, and or
representatives of the Company are not responsible for any losses arising from
the information presented or contained in this presentation material. The
information presented or contained in these presentation materials is subject to
change without notice and its accuracy is not guaranteed. This presentation
material contains statements which are forward-looking statements. These
statements include a description of the Company's hopes and expectations in
relation to the consolidated results of operations, the Company's future
performance, and the potential assets to be acquired by the Company, except for
historical matters. In this presentation material, there are words such as “plan”,
“will”, “estimate”, “project”, “intend”, or words with similar meaning. Such
forward-looking statements do not guarantee future performance and involve
risks and uncertainties, and differ from actual results. The Company has no
obligation and does not revise any forward-looking statements to reflect future
events/conditions.

This presentation material is made for informational purposes only and does
not constitute or form part of any solicitation, offer or invitation to purchase or
subscribe to any securities of the Company in any jurisdiction or form the basis,
commitments and contracts of any kind, or any investment decision. Any
decision to purchase the Company's securities must be made by seeking
appropriate professional advice.




                                                                                      2
Page 3
AGENDA



 01         02           03            04            05


  COMPANY   STRATEGY &   OPERATIONAL   FINANCIAL     APPENDIX
  PROFILE   OUTLOOK      PERFORMANCE   PERFORMANCE




                                                                3
Page 4
Chapter 1


COMPANY
PROFILE



            4
Page 5
WHY INVEST in RMKO

  01                          02                           03                   04

  Strategic                    Integrated                  Affiliated with        New and
  Assets Location              Mining Service              PT RMK Energy         Big Fleets
                                                           Tbk

            05                             06                       07                        08

             Solid Balance Sheet           High Safety               Long Track Record        Good Corporate
             DER 0.5 time*                 Standard                  Experienced &            Governance
                                           Zero fatality             Professional             Implementing
                                                                     Management               good mining
             *Full Year 2025 Performance                                                      practices




                                                                                                               5
Page 6
COMPETITIVE ADVANTAGE


                                      Affiliated with PT RMK
                                            Energy Tbk,
                                     providing an integrated
                                      coal logistics solution


01                02                03               04                05          06


 Partnership      Owning 38 km      Having Train      Holding mining   Competent   New & big
 with PT Kereta   of coal hauling   Loading System    permits          team        fleets
 Api Indonesia    road              (TLS)
 (KAI) in South
 Sumatera




                                                                                               6
                                                                                               6
Page 7
OUR SERVICES


 01                 02                 03               04                05               06


 Infrastructure     Mining             Hauling          Emplacement       Reclamation      Rental
 Preparation        ● Survey and       ● Hauling road   Services          Ex-Mining        ● Heavy
                      exploration        construction                     Area               equipment
 ● Mining                                               ● Stockpile
   infrastructure   ● Mine modelling   ● Coal hauling     management                         rental
                      and design                                          ● Top soil       ● Workshop
 ● Emplacement                                          ● Coal crushing
                    ● Overburden                                            spreading      ● Warehouse
   infrastructure                                       ● Train Loading
                      removal                                             ● Revegetation
                                                          System (TLS)
                    ● Coal getting




                                                                                                         7
Page 8
MANAGEMENT TEAM




                  TONY SAPUTRA
                  President Commissioner

                  ROKHMAD SUNANTO
                  Independent Commissioner

                  NATHANIA PRICILLA
                  SAPUTRA
                  Director

                  VINCENT SAPUTRA
                  President Director

                  WILLIAM SAPUTRA
                  Director




                                             8   8
Page 9
Chapter 2


STRATEGY
& OUTLOOK



            9
Page 10
CORPORATE STRATEGY

 01                       02                       03
      Optimizing the           The completion of        Optimizing coal
      potential of coal        dedicated coal           loading capacity
      mining services          hauling road

 04                       05
      Good mining              People
      practices                development




                                                                           10
Page 11
ONGOING PROJECT ACTIVITY


 Upgrade of the coal
 hauling road using
 CTRB (Cement
 Treated Recycling
 Base) to improve road
 durability and
 maintain hauling
 truck performance in
 support of production




                           11
Page 12
Chapter 3


OPERATIONAL
PERFORMANCE



              12
Page 13
RMKO LOADS 1.8 MILLION TONS OF COAL
VIA GUNUNG MEGANG LOADING STATION

Downstream Hauling                                      Train Loading
  4Q 2025 +2,194.6% YoY to 281.7 thousand ton             4Q 2025 +266.4% YoY to 867.2 thousand ton
  12M 2025 +6,354.7% YoY to 792.4 thousand ton            12M 2025 +97.8% YoY to 1.8 million ton

                                                                                                      1.8




                                                 0.8                                    0.9    0.9
                                                                                 0.6

                     0.2    0.2    0.3                     0.2            0.2
   0.0     0.1                            0.0                      0.1

    4Q       1Q       2Q     3Q     4Q    12M    12M         4Q     1Q     2Q     3Q     4Q    12M    12M
   2024     2025     2025   2025   2025   2024   2025       2024   2025   2025   2025   2025   2024   2025


     Coal (million ton)


                                                                                                             13
Page 14
THIRD PARTIES MINING VOLUME SURGE
VIA STRATEGIC PARTNERSHIP

Third Parties’ OB Removal                               Third Parties’ Coal Getting
  4Q 2025 +4,225.6% YoY to 515.2 thousand bcm
  12M 2025 +11,671.2% YoY to 1.4 million bcm


                                                 1.4




                                   0.5
                   0.4                                                                                    0.4
          0.3
                            0.2                                                             0.2
    0.0                                   0.0               0.0     0.0       0.1    0.1           0.0

    4Q      1Q      2Q       3Q     4Q    12M    12M         4Q       1Q       2Q     3Q     4Q    12M    12M
   2024    2025    2025     2025   2025   2024   2025       2024     2025     2025   2025   2025   2024   2025


     OB Removal (million bcm)                                 Coal (million ton)

                                                                                                                 14
Page 15
Chapter 4


FINANCIAL
PERFORMANCE



              15
Page 16
REVENUE SOARS 63.6% YOY
WITH STRONG RECOVERY MOMENTUM

Operating Revenue
    4Q 2025 +190.6% YoY to IDR188.2 bn
    12M 2025 +63.6% YoY to IDR407.6 bn


                                                    407.6

                                                            Operating revenue
                                                            segment contribution:
                                            249.1           •   Mining 31.0%
                                    188.2                   •   Rental 30.3%
                                                            •   Construction 38.7%
                            123.6
     64.8            53.3
              42.5

        4Q     1Q     2Q      3Q      4Q     12M     12M
       2024   2025   2025    2025    2025    2024    2025


in bn IDR



                                                                                     16
Page 17
IMPRESSIVE REVENUE GROWTH SUPPORTED BY
RENTAL & CONSTRUCTION SEGMENT
Mining Segment                                         Rental Segment                                       Construction
   4Q 2025 +0.3% YoY to IDR34.8 bn                       4Q 2025 +111.0% YoY to IDR57.7 bn                  Segment
                                                                                                              4Q 2025 +3,442.6% YoY to IDR95.6 bn
   12M 2025 +0.1% YoY to IDR126.2                        12M 2025 +22.7% YoY to IDR123.5 bn                    12M 2025 +606.5% YoY to IDR157.9 bn
   bn

                                                                                                                                                          157.9
                                        121.1 126.2                                                 123.5
                                                                                            100.7                                           95.6

                                                                                     57.7                                            62.2
   34.7            36.5
            25.2          29.6 34.8                      25.3                 31.7                                                                 22.3
                                                                17.3   16.8                                     2.7    0.0    0.0

    4Q       1Q     2Q     3Q     4Q     12M    12M       4Q     1Q     2Q     3Q     4Q     12M     12M         4Q     1Q     2Q     3Q     4Q    12M     12M
   2024     2025   2025   2025   2025    2024   2025     2024   2025   2025   2025   2025    2024    2025       2024   2025   2025   2025   2025   2024    2025


in bn IDR




                                                                                                                                                             17
Page 18
RMKO BOOKED PROFIT IN 4Q 2025

Gross Profit (loss)                                                EBIT
  4Q 2025 +855.2% YoY to IDR11.9 bn                                4Q 2025 +127.1% YoY to IDR1.8 bn
  12M 2025 -312.7% YoY to IDR29.4 bn                               12M 2025 -1,859.6% YoY to IDR-54.2 bn
                                  10.0%
                                        11.9      13.8                                          5.7%
                                   12.4                                                              1.0%
  -2.4%                                                                                         7.0   1.8 -1.1%
  (1.6)                                                             -10.2
                                                         -7.2%                                                         -13.3
                                                                      %
                                                                                                                         %
                                          6.3% 5.5%
                                                                                                               (2.8)
                                                                     (0.0)



                       (26.0)                            (29.4)
           (27.7)
                       -48.8                                                   (32.8) (30.2)
           -65.0
                         %                                                     -77.2 -56.6
             %                                                                          %
                                                                                 %

                                                                                                                       (54.2)
     4Q         1Q          2Q      3Q      4Q    12M     12M          4Q          1Q     2Q      3Q     4Q     12M     12M
    2024       2025        2025    2025    2025   2024    2025        2024        2025   2025    2025   2025    2024    2025

  Gross Profit                                                       EBIT
  Gross Profit Margin (%)                                            EBIT Margin (%)
                                                                                                                                18
Page 19
122.6% YOY NET PROFIT SURGE IN Q4 2025

EBITDA                                                        Net profit (loss)
 4Q 2025 +178.3% YoY to IDR25.7 bn                              4Q 2025 +122.6% YoY to IDR1.9 bn
 12M 2025 -68.7% YoY to IDR16.4 bn                              12M 2025 -164.5% YoY to IDR-49.4 bn
                                               21.1%
                                                52.5
                               18.6%   13.7%
  14.3%                         23.0    25.7           4.0%
                                                       16.4

   9.2
                                                                                                   4.3    1.9    -7.5%    -12.1%
                    -28.1%

                                                                                                    3.5% 1.0%
            (17.3)    (15.0)                                      (8.5)                                          (18.7)
                                                                 -13.1%       (29.0)      (26.6)
           -40.7%

                                                                                          -49.8%
                                                                                                                           (49.4)

                                                                             -68.3%
    4Q        1Q        2Q       3Q      4Q    12M     12M           4Q          1Q         2Q      3Q     4Q     12M      12M
   2024      2025      2025     2025    2025   2024    2025         2024        2025       2025    2025   2025    2024     2025

  EBITDA                                                                                                             in bn IDR
  EBITDA margin                                                 Net profit (loss)
                                                                Net profit (loss) margin
                                                                                                                                    19
Page 20
COST OF REVENUES BREAKDOWN FOR FULL YEAR
2025

                                                                                             2.7%            1.7%           100.0%
                                                                          16.0%
                                                                                     70.1             12.0            7.3               437.0
                                                       16.2%
                                      18.9%                     70.9
                    20.5%                       82.6
                               89.6
   23.9%
            104.5



     Fuel           Material           Salaries &                        Depreciation &      Rental          Others         Total cost of
                                                        Repairs &       Amortization of                                      revenues
                                      allowances       maintenance     right of use assets
                                                                                                                                  in bn IDR
The cost of revenues, mostly contributed by:
• Fuel
• Material
• Salaries and allowances

                                                                                                                                                20
Page 21
STRONG CAPITAL STRUCTURE MAINTAINED
DURING INVESTMENT PHASE

Asset                                    Liability                                       Equity
4Q 2025 +1.2% to IDR557.0 bn             4Q 2025 +17.4% to IDR378.8 bn                   4Q 2025 -21.7% to IDR178.2 bn

                                                           0.9
                                             0.8                  0.8
                                                                          0.7
            616.8
  550.3             560.6 598.8 557.0                                             0.5
                                                       418.3 388.6       422.5
                                                                                 378.8
                                           322.7
                                                                                           227.6
                                                                                                      198.5 172.0 176.3 178.2



    4Q        1Q     2Q     3Q     4Q         4Q            1Q     2Q     3Q      4Q          4Q        1Q     2Q     3Q     4Q
   2024      2025   2025   2025   2025       2024          2025   2025   2025    2025        2024      2025   2025   2025   2025

    Asset                                    Liabilities                                     Equity                   in bn IDR
                                             DER (x)




                                                                                                                                   21
Page 22
SIGNIFICANT IMPROVEMENT IN OPERATING
CASH FLOW IN 4Q 2025

Operating                                                    Investing                                                     Financing
  4Q 2025 +1,600.4% YoY to IDR220.2                          4Q 2025 -226.8% YoY to IDR-17.0 bn                            4Q 2025 -1,810.5% YoY to IDR-201.9 bn
  bn                                                         12M 2025 -65.7% YoY to IDR-29.4 bn                            12M 2025 -140.3% YoY to IDR-115.7 bn
  12M 2025 +18.8% YoY to IDR146.3 bn
                                  220.2
                                                                                                                                       53.9   51.8


                                                  146.3
                                          123.2
                                                                13.4            10.1            (17.0)                        (10.6)                 (19,5)
                                                                                                                                                                    (48.2)
                                                                       (11.0)          (11.4)
                                                                                                                  (29.4)
                           31.3
                                                                                                         (85.7)                                                              (115.7)

  12.9
         (39.6)
                                                                                                                                                          (201.9)
                  (65.6)

   4Q      1Q       2Q       3Q       4Q     12M      12M     4Q     1Q      2Q         3Q       4Q       12M      12M        4Q        1Q     2Q       3Q     4Q      12M        12M
  2024    2025     2025     2025     2025    2024     2025   2024   2025    2025       2025     2025      2024     2025      2024      2025   2025     2025   2025     2024       2025



                                                                                                                                                                        in bn IDR

                                                                                                                                                                                       22
Page 23
Chapter 5



APPENDIX




            23
Page 24
CONSOLIDATED OPERATIONAL PERFORMANCE
                                                                                                          (in ton, unless stated otherwise)

                               4Q 2024    1Q 2025    2Q 2025    3Q 2025    4Q 2025    YoY (%) 12M 2024 12M 2025           YoY (%)
         INDICATOR
                                  a         b           c          d          e        e/a       f          g                 g/f
RENTAL SEGMENT
Downstream Hauling (ton)        12,277      86,411    181,660    242,665    281,703   2,194.6    12,277   792,439            6,354.7
Train Loading with TLS (ton)   236,677     137,071    220,304    559,235    867,274     266.4   901,800 1,783,885                 97.8
3RD PARTIES MINING SERVICES
OB Removal (bcm)                11,911     263,820    403,471    219,553    515,224   4,225.6    11,911 1,402,068          11,671.2
Coal Getting (ton)                    0     13,793    121,595     76,635    162,412      N.A.        0    374,436                 N.A.




                                                                                                                                     24
Page 25
CONSOLIDATED STATEMENTS OF PROFIT (LOSS)
                                                                                                       (currency in IDR bn, unless stated otherwise)
          INDICATOR          4Q 2024     1Q 2025      2Q 2025     3Q 2025     4Q 2025     Chg (%)         12M 2024       12M 2025         Chg (%)
 REVENUES
 Mining services                 34.7         25.2        36.5        29.6        34.8          0.3             126.1          126.2                0.1
 Rental                          27.3         17.3        16.8        31.7        57.7        111.0             100.7          123.5            22.7
 Construction services            2.7          0.0         0.0        62.2        95.6      3,442.6              22.3          157.9           606.5
 Total Operating Revenues        64.8         42.5        53.3       123.6       188.2        190.6             249.1          407.6            63.6
 EXPENSES
 COGS mining services           (35.3)      (41.7)       (54.7)      (21.7)      (48.2)        36.4           (119.1)         (166.3)           39.7
 COGS rental                    (27.9)      (28.5)       (24.6)      (49.5)      (60.1)       115.6             (95.1)        (162.7)           71.1
 COGS construction               (3.1)         0.0         0.0       (40.0)      (67.9)     2,089.0             (21.1)        (107.9)          411.2
 Total COGS                     (66.3)      (70.2)       (79.3)     (111.2)     (176.2)       165.7           (235.3)         (437.0)           85.7
 G&A                             (5.0)        (5.2)       (4.1)       (5.3)      (10.2)       102.5             (16.6)         (24.8)           49.5
 Finance cost                    (4.2)        (4.0)       (3.8)       (3.1)       (2.4)       (43.6)            (20.0)         (13.2)          (33.7)
 Income Tax Expenses              1.9          8.0         7.4         0.8         2.5         28.7               4.1            18.8          352.3
 PROFITABILITY
 Gross Profit                     (1.6)      (27.7)       (26.0)       12.4        11.9        855.2              13.8          (29.4)         (312.7)
 EBIT                            (6.6)      (32.8)       (30.2)        7.0         1.8        127.1              (2.8)         (54.2)       (1,859.6)
 EBT                            (10.4)      (37.1)       (34.0)        3.5        (0.6)        94.5             (22.8)         (68.1)         (198.7)
 Net Income                      (8.5)      (29.0)       (26.6)        4.3         1.9        122.6             (18.7)         (49.4)         (164.5)
 Comprehensive Income/Loss       (8.5)      (29.0)       (26.6)        4.3         1.9        122.6             (18.7)         (49.4)         (164.6)


 EBITDA                           9.2       (17.3)       (15.0)       23.0        25.7        178.3              52.5            16.4          (68.7)
 Gross Profit Margin (%)         -2.4%      -65.0%       -48.8%      10.0%         6.3%                           5.5%          -7.2%
 Net Margin (%)                -13.1%      -68.3%       -49.8%        3.5%        1.0%                          -7.5%         -12.1%
 EBITDA Ratio (>1 x)*             2.2         (4.3)       (4.0)        7.4        10.8                            2.6             1.2

*Credit covenant: EBITDA ratio (EBITDA/Interest+principal) >1

                                                                                                                                                          25
Page 26
CONSOLIDATED STATEMENTS
OF FINANCIAL POSITION
                                                                   (currency in IDR bn, unless stated otherwise)


          INDICATOR          4Q 2024    1Q 2025    2Q 2025    3Q 2025     4Q 2025              Chg (%)
ASSETS
Current Assets                 129.9       145.9      133.9      149.1           111.7               (14.1)
Non Current Assets             420.4       470.9      426.7      449.7           445.4                    5.9
Total Asset                    550.3       616.8      560.6      598.8           557.0                    1.2
LIABILITY
Current Liabilities            224.8       329.5      326.8      375.3           343.2                 52.7
Non Current Liabilities          98.0       88.8       61.8       47.2              35.7             (63.6)
Total Liabilities              322.7       418.3      388.6      422.5           378.8                 17.4
EQUITY
Equity                         227.6       198.5      172.0      176.3           178.2               (21.7)
Total Liabilities & Equity     550.3       616.8      560.6      598.8           557.0                    1.2


                                                                                                                   26
Page 27
RMKO MEETS THE MINIMUM REQUIREMENTS
OF CREDIT COVENANT
                                                                                     (currency in IDR bn, unless stated otherwise)

            INDICATOR                    4Q 2024        1Q 2025         2Q 2025     3Q 2025          4Q 2025          Chg (%)
FINANCIAL DEBT SEGMENT                                                                                                               Short Term Debt
Short Term Debt                                 95.6          88.5          75.1           69.1              60.4          (36.8)    63.2%
Long Term Debt                                  97.5          88.3          61.4           46.8              35.1          (64.0)
Total Financial Debt                          193.1          176.9         136.5         115.9               95.5          (50.5)
                                                                                                                                     Long Term Debt

FINANCIAL RATIO                          4Q 2024        1Q 2025         2Q 2025     3Q 2025          4Q 2025                         36.8%
DER (x)                                          0.8              0.9         0.8            0.7              0.5
Current Ratio (x)                                0.6              0.4         0.4            0.4              0.3
ROA (%)                                         (3.4)        (10.6)        (11.4)        (10.0)              (8.9)
ROE (%)                                         (8.2)        (33.1)        (37.1)        (33.9)            (27.7)
Net Gearing (x)                                  0.8              0.9         0.8            0.6              0.5
EBITDA/(interest+principal)                     2.63          1.57         (0.23)        (0.00)            (1.24)
Non-trade receivables*                          67.8          70.1          28.8           24.1               1.6

 *Credit covenant:
1. DER max 2.5 time
2. Non-trade receivables related parties (max IDR196.0 billion)
                                                                                                                                                       27
Page 28
CONSOLIDATED STATEMENTS
OF CASH FLOW

                                                                                                                   (currency in bn IDR, except stated otherwise)


                  INDICATOR                     4Q 2024    1Q 2025    2Q 2025    3Q 2025    4Q 2025    Chg (%)      12M 2024         12M 2025         Chg (%)

CASH FLOW
Cash flows from operating                           12.9      (39.6)     (65.6)      31.3      220.2     1,600.4          123.2             146.3          18.8
Cash flows from investing activities                13.4      (11.0)      10.1      (11.4)     (17.0)    (226.8)          (85.7)            (29.4)       (65.7)
Cash flows from financing activities               (10.6)       53.9       51.8      (19.5)    (201.9)   (1,810.5)         (48.2)          (115.7) (140.3)
Net increase in cash and cash equivalents          15.8        3.3       (3.7)        0.3       1.2       (92.2)         (10.7)                1.2      110.9
Cash and cash Equvalents at beginning of year       3.5        3.6        6.9         3.2       3.5         0.7            14.3                3.6      (74.9)
Cash and cash Equvalents at end of period          19.3        6.9        3.2         3.5       4.7       (75.4)             3.6               4.7        32.5
Cash and banks                                      5.1        7.0        5.0         5.0       5.6        10.0              5.1               5.6        10.0
Bank overdraft                                     (1.5)      (0.0)      (1.8)      (1.5)      (0.9)       42.0            (1.5)             (0.9)      (42.0)




                                                                                                                                                       28
Page 29
            Wisma RMK 3rd Floor
            Jalan Puri Kencana Blok M4 No.1
            Kembangan, Jakarta Barat,
            Jakarta 11610
            E:rmk@ptrmk.com
            T:+62 21-5822-555


Thank You   rmko.co.id

            PT Royaltama Mulia Kontraktorindo Tbk




                                                    29

File

File Open PDF
Source IDX
Size10.83 MB
Published10 Mar 2026
Pages29
Characters32,412
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 8 people and organisations named in the text · linked when the evidence is strong

linked org PT RMK Energy p.5 ×4
linked person ROKHMAD SUNANTO p.8
linked person VINCENT SAPUTRA p.8
possible person TONY SAPUTRA p.8
possible person WILLIAM SAPUTRA p.8
unresolved org Big Fleets Tbk p.5
unresolved org PT Kereta p.6

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

Other files in this announcement 1

↑↓ select ↵ open ⇧↵ see every result