Back to announcement
20230710_ARCI_Laporan Bulanan Aktivitas Eksplorasi_31339598_lamp2.pdf
Other Text extracted ARCISource file signed link, expires in 15 minutes
Extracted text 5
Page 1
No: 0042/ARCHI/7/2023/G
EXPLORATION REPORT
PT Archi Indonesia Tbk.
30th June 2023
Page 2
No: 0042/ARCHI/7/2023/G
PT Archi Indonesia Tbk. (the ”Company” or “ARCI”) owns 100% of the Toka Tindung Gold
Mine, a pure-play gold mine located approximately 35 kilometers northeast of the regional
capital, Manado, in North Sulawesi, Indonesia, through the Company’s wholly-owned
subsidiaries, PT Meares Soputan Mining (“MSM”) and PT Tambang Tondano Nusajaya
(“TTN”).
The Toka Tindung Gold Mine consists of two long-term Contract of Works (“CoWs”) covering
39,817 hectares, which cover into two administration areas in North Sulawesi, North Minahasa
and Bitung City districts (Figure 1). The CoWs are valid until 2041 and are held by MSM and
TTN. Pursuant to the Mining Law Amendment, MSM and TTN have been guaranteed two
more extensions of the CoWs in the form of Special Mining Business License/Izin Usaha
Pertambangan Khusus (“IUPK”), each for maximum period of 10 years.
Figure 1. Map Location of MSM and TTN’s Contract of Works
Exploration activities carried out by the Company, through its subsidiaries, which are MSM
and TTN, for the period January 2023 to June 2023 were focused on mapping and IP
geophysics activities in the Greenfield area and semi detail to detail mapping in the Brownfield
area of the Western Corridor (Wesco) Project. Exploration drilling activities and Gold Resource
Definition drilling in Western Corridor Project (Talawaan & Wiau Prospect) and also
Exploration drilling in Eastern Corridor Project (South Marawuwung and South Blambangan
Prospect) as presented in the map below (Figure 2).
Page 3
No: 0042/ARCHI/7/2023/G
Below are the details of Exploration activities costs for the period January 2023 to June 2023:
Total Exploration activities costs for the period January 2023 were US$634,084 or
equivalent to Rp9.5 billion.
Total Exploration activities costs for the period February 2023 were US$529,113 or
equivalent to Rp8.1 billion.
Total Exploration activities costs for the period March 2023 were US$693,085 or
equivalent to Rp10.4 billion.
Total Exploration activities costs for the period April 2023 were US$756,416 or
equivalent to Rp11.2 billion.
Total Exploration activities costs for the period May 2023 were US$732,189 or
equivalent to Rp11.0 billion.
Total Exploration activities costs for the period June 2023 were US$666,046 or
equivalent to Rp10.0 billion.
Therefore, the total Exploration activities costs for the period January 2023 to June 2023
US$4,010,933 or equivalent to around Rp60.2 billion.
Meanwhile, the details of drilling activities for the period January 2023 to June 2023 were as
follow:
On January 2023, ARCI had conducted drilling at 26 holes with a total depth of 5,508.6
meters.
On February 2023, ARCI had conducted drilling at 42 holes with a total depth of
4,561.3 meters.
On March 2023, ARCI had conducted drilling at 11 holes with a total depth of 2,581.1
meters.
On April 2023, ARCI had conducted drilling at 11 holes with a total depth of 2,851.6
meters.
On May 2023, ARCI had conducted drilling at 16 holes with a total depth of 3,991.6
meters.
On June 2023, ARCI had conducted drilling at 10 holes with a total depth of 2,140.0
meters.
Therefore, the total drilling activities conducted for the period January 2023 to June 2023 were
around 116 holes and 21,634.20 meters.
Drilling activities for gold Resource Definition and Exploration, involved Diamond Drilling
(“DD”) and Reverse Circulation (“RC”) drilling methods, were performed by PT Maxidrill
Indonesia through a contract/agreement. Details of number of drill programs by project and by
month, quarter- and half-yearly reporting period by drilling method are shown in Table 1.
Page 4
No: 0042/ARCHI/7/2023/G
Table 1. 2023 Monthly, Quarterly and Half-yearly drilling statistics by prospect and drill type.
Diamond Drilling (DD) Reverse Circulation (RC)
Prospect
Period Number of Drilling Number of Drilling
Area
Drill Holes Meters Drill Holes Meters
Blambangan 5 1,341.1 13 2,164.0
January 2023 Toka 1 195.0 2 277.0
Wesco 5 1,531.5 - -
Sub Total 11 3,067.6 15 2,441.0
Toka 3 299.6 34 2,916.0
February 2023 Wesco 5 1,345.7 - -
Sub Total 8 1,645.3 34 2,916.0
Toka 3 662.7 - -
March 2023 Marawuwung 1 432.3 - -
Wesco 7 1,486.1 - -
Sub Total 11 2,581.1 - -
Q1 TOTAL 30 7,294.0 49 5,357.0
Marawuwung 4 737.2 - -
April 2023 Wesco 5 1,269.3 - -
Wiau 2 845.1 - -
Sub Total 11 2,851.6 - -
Blambangan 3 690.3 - -
Marawuwung 3 919.2 - -
May 2023 Wesco 6 1,327.1 - -
Wiau 4 1,055.0
Sub Total 16 3,991.6 - -
Blambangan 4 791.9 - -
June 2023 Wesco 4 1,138.8 - -
Wiau 2 209.3 - -
Sub Total 10 2,140.0 - -
Q2 TOTAL 37 8,983.2 - -
Half (H1) 2023 Total 67 16,277.2 49 5,357.0
Page 5
No: 0042/ARCHI/7/2023/G Figure 2. Map of drilling progress for the period January 2023 to June 2023
Names mentioned 0 people and organisations named in the text · linked when the evidence is strong
The name pass has not read this document yet.
Extraction attempts how the parser did, and what it refused
Nothing structured was extracted from this document — the attempts below say why.
No extraction attempted yet.