Skip to content
Back to announcement

20260225_PGEO_Laporan Informasi dan Fakta Material_32029168.pdf

Other Text extracted PGEO

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 6

Page 1
Go To English Page

 Nomor Surat                           071/PGE500/2026-S0

 Nama Perusahaan                       PT Pertamina Geothermal Energy Tbk

 Kode Emiten                           PGEO

 Lampiran                              0
                                       PGE Jajaki Pasar Internasional, Targetkan Pemasangan Perdana Flow2Max di
 Perihal
                                       Energy Development Corporation Filipina pada Juni 2026


Dengan ini kami untuk dan atas nama perusahaan menyampaikan Laporan Informasi atau Fakta Material sebagai
berikut:

 Nama Emiten atau Perusahaan Publik            PT Pertamina Geothermal Energy Tbk

 Bidang Usaha                                  Menyelenggarakan usaha bidang panas bumi dari hulu/hilir



 Telepon                                       +62 21 3983 3222

 Faksimili                                     +62 21 3983 3230

 Alamat Surat Elektronik (email)               datapge@pertamina.com


 Tanggal Kejadian                              25 Februari 2026
 Jenis Informasi atau Fakta Material           PGE Jajaki Pasar Internasional, Targetkan Pemasangan
                                               Perdana Flow2Max di Energy Development Corporation
                                               Filipina pada Juni 2026
Page 2
Uraian Informasi atau Fakta Material   PT Pertamina Geothermal Energy Tbk (PGE) (IDX: PGEO)
                                       memulai rangkaian roadshow global dengan mengunjungi
                                       lapangan wet steam terbesar di dunia milik Energy
                                       Development Corporation (EDC) di Leyte, Filipina. Kunjungan
                                       ini menjadi langkah strategis PGE dalam mengoptimalkan
                                       pengembangan teknologi panas bumi melalui penerapan
                                       Flow2Max. Inisiatif tersebut mencerminkan upaya PGE untuk
                                       membuka sumber pendapatan baru melalui komersialisasi
                                       inovasi sekaligus memperkuat ekosistem manufaktur dan jasa
                                       pengembangan panas bumi, selaras dengan visinya sebagai
                                       world class green energy company.

                                       Dalam agenda ini, PGE hadir bersama PT Sigma Cipta Utama
                                       (SCU) yang merupakan anak usaha PT Elnusa Tbk bagian
                                       dari Pertamina Hulu Energi. Kunjungan ini menjadi upaya PGE
                                       untuk memperluas kolaborasi internasional dan pembahasan
                                       potensi implementasi perdana teknologi Flow2Max di
                                       lapangan panas bumi milik EDC. Kedua pihak membahas
                                       berbagai aspek teknis, meliputi pemenuhan kebutuhan teknis,
                                       pengukuran lapangan, dan negosiasi harga, sebelum
                                       memasuki tahap manufaktur serta pengiriman perangkat
                                       menuju instalasi. Pemasangan perdana ditargetkan pada Juni
                                       2026.

                                       Head of Geothermal Technology and Innovation (Subsurface
                                       Team) Energy Development Corporation Erlindo Angcoy Jr.
                                       menyambut langsung delegasi PGE yang diwakili oleh
                                       Manager Ops. Asset Management & Optimization PGE Jati
                                       Permana Kurniawan, Manager Production & Optimization
                                       Excellence PGE Mohamad Husni Mubarok, beserta tim terkait.
                                       Turut hadir dalam pertemuan tersebut perwakilan Ecolab
                                       International Indonesia (Ecolab) selaku mitra pengembangan
                                       Flow2Max, serta PT Sigma Cipta Utama (SCU).

                                       Dalam sesi diskusi, Head of Geothermal Technology and
                                       Innovation (Subsurface Team) EDC Erlindo Angcoy Jr.
                                       memaparkan gambaran umum lapangan panas bumi Leyte
                                       beserta tantangan operasional yang dihadapi. Erlindo
                                       menyampaikan ketertarikan terhadap teknologi Flow2Max
                                       karena teknologi ini sesuai dengan profil lapangan dan
                                       kebutuhan EDC dalam mendukung optimalisasi kinerja sumur
                                       panas bumi.

                                       Dalam kesempatan yang sama, PGE berbagi pengalaman
                                       dalam penanganan sumur-sumur superheat dari perspektif
                                       operasi serta pengelolaan uap panas bumi super panas
                                       (geothermal superheated steam) di wilayah kerjanya.

                                       Manager Production & Optimization Excellence PGE
                                       Mohamad Husni Mubarok, Ph.D. mengatakan, Kami bangga
                                       dapat memperkenalkan inovasi teknologi pengelolaan
                                       superheated steam PGE kepada salah satu perusahaan
                                       panas bumi terbesar dan bereputasi di dunia. Terlebih, Filipina
                                       saat ini menempati peringkat ketiga kapasitas panas bumi
                                       dunia setelah Amerika Serikat dan Indonesia. Kami harap
                                       penerapan teknologi Flow2Max dapat mendukung optimalisasi
                                       operasional, meningkatkan efisiensi produksi, serta
                                       memperkuat pengelolaan reservoir EDC secara berkelanjutan.

                                       Flow2Max hadir sebagai teknologi pengukuran dua fase (two-
                                       phase flow meter) yang memungkinkan pemantauan aliran
                                       fluida secara real-time, sehingga operator dapat mengevaluasi
                                       kinerja serta memprediksi produktivitas sumur produksi
Page 3
                                           dengan lebih akurat. Penggunaan Flow2Max juga memperkuat
                                           manajemen dan optimalisasi reservoir di setiap lapangan
                                           panas bumi, termasuk membantu mendeteksi dini potensi
                                           masalah teknis pada sumur. Inovasi ini dikembangkan dari
                                           riset studi doktoral oleh Manager Production and Operation
                                           Excellence PGE Mohamad Husni Mubarok, Ph.D. saat
                                           menempuh pendidikan di University of Auckland.

                                           Manager Ops. Asset Management & Optimization PGE Jati
                                           Permana Kurniawan menambahkan PGE dan EDC sepakat
                                           untuk terus menjalin kerja sama strategis.

                                           Ke depan, kami berkomitmen untuk memperkuat kolaborasi
                                           ini, tidak hanya implementasi teknologi, tetapi juga melalui
                                           pertukaran pengetahuan dan penguatan kapabilitas teknis
                                           guna mendorong kemajuan sektor panas bumi di tingkat
                                           global. Langkah ini juga sejalan dengan visi PGE untuk
                                           menjadi world leading geothermal producer sekaligus
                                           geothermal center of excellence, ujar Jati Permana Kurniawan.

Dampak kejadian, informasi atau fakta
material tersebut terhadap kegiatan
operasional, hukum, kondisi keuangan,
atau kelangsungan usaha Emiten atau
Perusahaan Publik



Demikian untuk diketahui.


Hormat Kami,
PT Pertamina Geothermal Energy Tbk




Kitty Andhora

Corporate Secretary




PT Pertamina Geothermal Energy Tbk
Grha Pertamina - Tower Pertamax Lt.7
Telepon : +62 21 3983 3222, Fax : +62 21 3983 3230, https://www.pge.pertamina.



Nama Pengirim                     Kitty Andhora

Jabatan                           Corporate Secretary
Tanggal dan Waktu                 25-02-2026 09:53




   Dokumen ini merupakan dokumen resmi PT Pertamina Geothermal Energy Tbk yang tidak memerlukan tanda
tangan karena dihasilkan secara elektronik oleh sistem pelaporan elektronik. PT Pertamina Geothermal Energy Tbk
                   bertanggung jawab penuh atas informasi yang tertera didalam dokumen ini.
Page 4
Go To Indonesian Page

 Letter / Announcement No.           071/PGE500/2026-S0

 Issuer Name                         PT Pertamina Geothermal Energy Tbk

 Issuer Code                         PGEO

 Attachment                          0

 Subject                             PGE Explores International Market, Targets First Installation of Flow2Max at
                                     Energy Development Corporation Philippines in June 2026

The company hereby announce the Material Information or Facts Report as follows

 Name of Issuer or Public Company             PT Pertamina Geothermal Energy Tbk

 Business Activities                          Menyelenggarakan usaha bidang panas bumi dari hulu/hilir


 Telephone                                    +62 21 3983 3222

 Faximile                                     +62 21 3983 3230

 Email Address                                datapge@pertamina.com


 Date of Event                                25 February 2026

                                              PGE Explores International Market, Targets First Installation of
 Type of Material Information or Facts        Flow2Max at Energy Development Corporation Philippines in
                                              June 2026
Page 5
Description of Material Information or   PT Pertamina Geothermal Energy Tbk (PGE) (IDX: PGEO)
Facts                                    began its global roadshow by visiting Energy Development
                                         Corporation's (EDC) largest wet steam field in the world in
                                         Leyte, Philippines. This visit is a strategic step for PGE in
                                         optimizing geothermal technology development through the
                                         application of Flow2Max. This initiative reflects PGE's efforts to
                                         open up new sources of revenue through the
                                         commercialization of innovation while strengthening the
                                         geothermal manufacturing and development services
                                         ecosystem, in line with its vision as a world-class green energy
                                         company.

                                         In this agenda, PGE was accompanied by PT Sigma Cipta
                                         Utama (SCU), a subsidiary of PT Elnusa Tbk, part of
                                         Pertamina Hulu Energi. This visit is part of PGE's efforts to
                                         expand international collaboration and discuss the potential for
                                         the initial implementation of Flow2Max technology in EDC's
                                         geothermal field. The two parties discussed various technical
                                         aspects, including technical requirements, field measurements,
                                         and price negotiations, before entering the manufacturing
                                         stage and shipping the equipment for installation. The initial
                                         installation is targeted for June 2026.

                                         Head of Geothermal Technology and Innovation (Subsurface
                                         Team) Energy Development Corporation Erlindo Angcoy Jr.
                                         welcomed the PGE delegation represented by PGE Asset
                                         Management & Optimization Operations Manager Jati
                                         Permana Kurniawan, PGE Production & Optimization
                                         Excellence Manager Mohamad Husni Mubarok, and the
                                         relevant team. Also present at the meeting were
                                         representatives from Ecolab International Indonesia (Ecolab)
                                         as a Flow2Max development partner, and PT Sigma Cipta
                                         Utama (SCU).

                                         During the discussion session, Head of Geothermal
                                         Technology and Innovation (Subsurface Team) EDC Erlindo
                                         Angcoy Jr. presented an overview of the Leyte geothermal
                                         field and the operational challenges faced. Erlindo expressed
                                         interest in Flow2Max technology because it is suitable for the
                                         field profile and EDC's needs in supporting geothermal well
                                         performance optimization.

                                         On the same occasion, PGE shared its experience in handling
                                         superheated wells from an operational perspective and in
                                         managing superheated geothermal steam in its working area.

                                         PGE's Manager of Production & Optimization Excellence,
                                         Mohamad Husni Mubarok, Ph.D., said, We are proud to
                                         introduce PGE's innovative superheated steam management
                                         technology to one of the world's largest and most reputable
                                         geothermal companies. Moreover, the Philippines currently
                                         ranks third in global geothermal capacity after the United
                                         States and Indonesia. We hope that the application of
                                         Flow2Max technology will be beneficial for the Philippines'
                                         geothermal sector.

                                         Flow2Max is a two-phase flow meter technology that enables
                                         real-time fluid flow monitoring, allowing operators to evaluate
                                         performance and predict production well productivity more
                                         accurately. The use of Flow2Max also strengthens reservoir
                                         management and optimization in every geothermal field,
                                         including helping to detect potential technical problems in wells
                                         early on. This innovation was developed from doctoral
Page 6
                                              research by PGE Production and Operation Excellence
                                              Manager Mohamad Husni Mubarok, Ph.D., while studying at
                                              the University of Auckland.

                                              PGE Asset Management & Optimization Operations Manager
                                              Jati Permana Kurniawan added that PGE and EDC have
                                              agreed to continue their strategic partnership.

                                              Going forward, we are committed to strengthening this
                                              collaboration, not only through technology implementation, but
                                              also through knowledge exchange and technical capability
                                              enhancement to drive the advancement of the geothermal
                                              sector at the global level. This step is also in line with PGE's
                                              vision to become a world-leading geothermal producer and
                                              geothermal center of excellence, said Jati Permana
                                              Kurniawan.
 Impact of event, material information or
 facts towards Issuers or Public
 Company’s operational activities, legal,
 financial condition, or going concern




Thus to be informed accordingly.


Respectfully,
PT Pertamina Geothermal Energy Tbk




Kitty Andhora

Corporate Secretary




PT Pertamina Geothermal Energy Tbk
Grha Pertamina - Tower Pertamax Lt.7
Phone : +62 21 3983 3222, Fax : +62 21 3983 3230, https://www.pge.pertamina.com



Sender Name                          Kitty Andhora

Function                             Corporate Secretary

Date and Time                        25-02-2026 09:53




   This is an official document of PT Pertamina Geothermal Energy Tbk that does not require a signature as it was
      generated electronically by the electronic reporting system. PT Pertamina Geothermal Energy Tbk is fully
                            responsible for the information contained within this document.

File

File Open PDF
Source IDX
Size0.01 MB
Published25 Feb 2026
Pages6
Characters18,055
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 9 people and organisations named in the text · linked when the evidence is strong

linked org Pertamina Geothermal Energy Tbk · Nama Perusahaan p.1 ×42
linked org Pertamina Hulu Energi. p.2 ×2
possible org Elnusa Tbk p.2 ×4
unresolved org Energy Development Corporation p.1 ×8
unresolved org PT Sigma Cipta Utama p.2 ×4
unresolved person Optimization Excellence PGE Mohamad Husni Mubarok p.2 ×2
unresolved person Operation Excellence PGE Mohamad Husni Mubarok p.3
unresolved person Kitty Andhora · Corporate Secretary p.3 ×2
unresolved person Operation Excellence Manager Mohamad Husni Mubarok p.6

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result