Skip to content
Back to announcement

20260112_POLI_Tanggapan atas Permintaan Penjelasan Bursa_32019044_lamp2.pdf

Other Text extracted POLI

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 10

Page 1
                                                                                      NOMOR & TANGGAL AKTA PPJB                                                                                                                            Versi Accounting
NO NO SERTIFIKAT/KELURAHAN              ATAS NAMA                        NIB                                      KONVERSI          SPPT 2017        SPPT 2016    SPPT 2015   SPPT 2012   SPPT 2024                     NOP                                        Biaya Notaris
                                                                                        NO          TANGGAL                                                                                                                        Luas        Harga Perolehan
1   HM. 01004/KANDRI                      MUHLIS                  11.01.14.15.00929            2     12/11/2002     D. II                 141,440      113,815       53,040      30,000      268,515 33.74.140.015.013-0179.0         1,105           27,625,000
2   HM. 01003/KANDRI                     MUSLIMIN                 11.01.14.15.00928            6     12/11/2002     D. II                 142,208      114,433       53,328      30,000      269,973 33.74.140.015.013-0178.0         1,111           27,775,000
3   HM. 00999/KANDRI                 ACHMAD MUALIM                11.01.14.15.00924           10     12/11/2002     D. II                 300,544      241,844      112,704      63,396      570,564 33.74.140.015.013-0177.0         2,348           58,700,000
4   HM. 01000/KANDRI                    HERMANTO                  11.01.14.15.00925           14     12/11/2002     D. II                 303,232      244,007      113,712      63,963      575,667 33.74.140.015.013-0176.0         2,369           59,225,000        3,250,000
5   HM. 00998/KANDRI                    JUNARIYAH                 11.01.14.15.00923           18     12/11/2002     D. II                 283,264                   106,224      59,751      537,759 33.74.140.015.013-0077.0         2,213           55,325,000
6   HM. 00617/KANDRI                 ASMINI, SALMONAH             11.01.14.15.00766           22    13-12-2002      D. III               2,164,224     870,762      405,792     228,258     4,108,644 33.74.140.015.011-0030.0        8,454          169,080,000
7   HM. 01883/KANDRI                      SUYONO                  11.01.1415.2146             26    13-12-2002        ~                   356,608      286,958      133,728      75,222      574,938 33.74.140.015.013-0175.0         2,366           53,235,000
8   HM. 01881/KANDRI                   SUROSO NARDI               11.01.1415.2148             30    13-12-2002      D. II                 374,528      301,378      140,448      79,002      579,555 33.74.140.015.013-0076.0         2,385           53,662,500
9   HM. 00681/KANDRI                      KATINI                  11.01.14.15.00831           34    13-12-2002      D. II                 535,040      430,540      200,640     112,860     1,203,840 33.74.140.015.011-0069.0        4,180           56,430,000        9,750,000
10 HM. 01710/KANDRI                       ASMADI                  11.01.14.15.01529           38    13-12-2002      S. IV                 136,320      109,695       51,120      30,000      258,795 33.74.140.015.016-0047.0         1,056           15,750,000
11 HM. 01644/KANDRI                       MUHRI                   11.01.14.15.01463           42    13-12-2002      D. II                 221,440      178,190       83,040      46,710               - 33.74.140.015.016-0201.0      1,730           43,250,000
12 HM. 01900/KANDRI              BIAH, RUSLAN, RUSMADI Cs         11.0114.15.02208            46    13-12-2002      D. II                              225,570                                        - 33,74,140,015,014-0004,0      3,485           47,850,000
13 HM. 01645/KANDRI                      SARNAWI                  11.01.14.15.01464           50    13-12-2002      D. II                                            83,040                  409,212 33,74,140,015,016-0201,0         1,684           42,100,000
14 HM. 01587/KANDRI                      TURSIHADI                11.01.14.15.01406           54    16-12-2002      D. II                 432,128      347,728      162,048      91,152      820,368 33.74.140.015.016-0009.0         3,376           47,264,000
15 HM. 01703/KANDRI                       ARBADI                  11.01.14.15.01522           58    16-12-2002      D. II                 340,608      274,083      127,728      71,847      646,623 33.74.140.015.016-0034.0         2,661           25,279,500
16 HM. 01702/KANDRI                       SUKARDI                 11.01.14.15.01521           62    16-12-2002      S. IV                 371,584      299,099      139,344      78,381      705,429 33.74.140.015.016-0164.0         2,903           27,578,500
17 HM. 00667/KANDRI                      KAMIYAH                  11.01.14.15.00817           66    16-12-2002      D. II                 140,032                    52,512      30,000      265,842 33.74.140.015.011-0098.0         1,094           16,410,000       23,650,000
18 HM. 00720/KANDRI                       NUR'Aeni                11.01.14.15.01880           70    16-12-2002      D. II                 431,232      347,007      161,712      90,963      818,667 33.74.140.015.013-0127.0         3,369           72,433,500
19 HM. 01603/KANDRI                      NUHYADI                  11.01.14.15.01422           74    16-12-2002      D. II                 967,808      778,783      362,928     204,147     2,355,257 33.74.140.015.016-0026.0        7,561          113,415,000
20 HM. 01584/KANDRI                      MUSRIYAH                 11.01.14.15.01408           78    16-12-2002      D. II    PAID                      194,258       90,528      50,922      458,298 33.74.140.015.016-0007.0         1,866           25,191,000       26,000,000
21 HM. 00643/KANDRI                       NGARIJO                 11.01.14.15.00793           82    16-12-2002      D. I                  148,992      119,892       55,872      31,428      282,852 33.74.140.015.011-0039.0         1,164           17,460,000
22 HM. 01600/KANDRI                      MUKHAERI                 11.01.14.15.01419           86    17-12-2002      D. II                 770,688      620,163      289,008     162,567     1,875,545 33.74.140.015.016-0027.0        6,021           87,304,500
23 HM. 00223/KANDRI                       KUSTIN                  11.01.14.15.00965           90    17-12-2002      S. IV                 280,320                   105,120      59,130      532,170 33.74.140.015.014-0004.0         2,190           76,650,000
24 HM. 00712/KANDRI                      KASTIMAH                 11.01.14.15.01872           94    17-12-2002      D. I                  204,032      164,182       76,512      43,038      387,342 33.74.140.015.013-0126.0         1,594           39,850,000       39,400,000
25 HM. 01039/KANDRI                       MATORI                  11.01.14.15.01894           98    17-12-2002      S. IV                 304,128      244,728      114,048      64,152      577,368 33.74.140.015.013-0194.0         2,376           42,768,000
26 HM. 01555/KANDRI                       NGATINI                 11.01.14.15.01374          102    17-12-2002      D. II                 123,520       99,395                   74,103      277,920 33.74.140.015.016.0051.0         2,638           61,993,000
27 HM. 01550/KANDRI                    SITI MALIKAH               11.01.14.15.01369          106    18-12-2002      D. IV                 133,248      107,223       49,968      30,000       252,963 33.74.140.015.016-0054.0        1,041           33,312,000
28 HM. 00589/KANDRI                    FAYA ARLOTTY               ~                          110    18-12-2002      D. II                                                                   2,004,508 33.74.140.015.013-0089.0        4,176           85,608,000
                                                                                                                                          823,680       662,805     308,880     173,745
29 HM. 00590/KANDRI                    FAYA ARLOTTY               ~                          114    18-12-2002      D. II                                                                             - 33.74.140.015.013-0089.0      2,246           46,043,000
30 HM. 01001/KANDRI                      SUGIYONO                 11.01.14.15.00926          118    18-12-2002      D. II                 607,360      488,735      227,760     128,115     1,366,560 33.74.140.015.013-0078.0        4,745          118,625,000
31 HM. 00221/KANDRI                       SUDARNI                 11.01.14.15.00963          122    18-12-2002      S. IV                 180,864      145,539       67,824      38,151      343,359 33.74.140.015.014-0005.0         1,413           49,455,000
32 HM. 00722/KANDRI                   RIBUT YULIANTO              11.01.14.15.01882          126    19-12-2002      D. II                 253,312      203,837       94,992      53,433      494,505 33.74.140.015.013-0129.0         2,035           45,787,500
33 HM. 01013/KANDRI                       NGAIDI                  11.01.14.15.00938          130    19-12-2002      D. II                 593,408      477,508      222,528     125,172     1,335,168 33.74.140.015.013-0085.0        4,636          115,900,000
34 HM. 00684/KANDRI               DR. MURTONO SABARUDIN           11.01.14.15.00834          134    19-12-2002      D. II    BILL NOT FOUND            249,775      116,400      65,475               - 33.74.140.015.001-0025.0      2,425           56,987,500
35 HM. 00616/KANDRI                       SUNARNI                 11.01.14.15.00765          138    19-12-2002      D. II                 333,824      268,624      125,184      70,416      633,744 33.74.140.015.011-0075.0         2,608           61,228,000
36 HM. 01734/KANDRI                       ASMU'I                  11.01.14.15.01553          142    19-12-2002      D. II                 201,088                    75,408      42,417      381,753 33.74.140.015.017-0018.0         1,571           14,924,500
37 HM. 01700/KANDRI                       KASMIDI                 11.01.14.15.01519          146    20-12-2002      D. II                 469,248      377,598      175,968      98,982      913,437 33.74.140.015.016-0036.0         3,759           37,590,000
38 HM. 00726/KANDRI                   BADI SULAIMAN               11.01.14.15.01886          150    20-12-2002      D. II                 386,816      311,266      145,056      81,594      734,346 33.74.140.015.013-0210.0         3,022           69,506,000
39 HM. 01701/KANDRI                      KASTONO                  11.01.14.15.01520          154    20-12-2002      D. II                 450,560      362,560      168,960      95,040      775,170 33.74.140.015.016-0035.0         3,190           30,305,000
40 HM. 01704/KANDRI                       PARSIKI                 11.01.14.15.01523          158    20-12-2002      D. II                 509,312      409,837      190,992     107,433      987,552 33.74.140.015.016-0014.0         4,064           40,640,000
41 HM. 01007/KANDRI                       PATENI                  11.01.14.15.00932          162    20-12-2002      D. II                 136,320      109,695       51,120      30,000      258,795 33.74.140.015.013-0084.0         1,065           36,210,000
42 HM. 01010/KANDRI                        PATMI                  11.01.14.15.00935          166    20-12-2002      D. II                 113,152       91,052       42,432      30,000      214,812 33.74.140.015.013-0184.0             884         30,056,000
43 HM. 01012/KANDRI                     CHORYATUN                 11.01.14.15.00937          170    21-12-2002      D. II                 125,440      100,940       47,040      30,000      238,140 33.74.140.015.013-0186.0             980         33,320,000
44 HM. 01011/KANDRI                      FATONAH                  11.01.14.15.00936          174    21-12-2002      D. II                  93,056       74,881       34,896      30,000      176,661 33.74.140.015.013-0185.0             727         24,718,000
45 HM. 01009/KANDRI                      FATIMAH                  11.01.14.15.00934          178    21-12-2002      D. II                                                                    216,027                                      889         33,014,000
46 HM. 01006/KANDRI                       TASLAN                  11.01.14.15.00931          182    21-12-2002      D. II                 251,904      202,704       94,464      53,136      478,224 33.74.140.015.013-0182.0         1,968           49,200,000        3,250,000
47 HM. 01024/KANDRI                      MUNAJAD                  11.01.14.15.01832          186    21-12-2002      D. II                 165,120      132,870       61,920      34,830      313,470 33.74.140.015.013-0090.0         1,290           25,800,000
48 HM. 01023/KANDRI                        SARTI                  11.01.14.15.01831          190    23-12-2002      D. II                 171,392      137,917       64,272      36,153      325,377 33.74.140.015.013-0196.0         1,339           26,780,000
49 HM. 00638/KANDRI                     BEJO ZUHRI                11.01.14.15.00788          194    23-12-2002      D. II                 466,432      375,332      174,912      98,388      885,492 33.74.140.015.011-0103.0         3,644           36,440,000
50 HM. 00640/KANDRI                      MARGIONO                 11.01.14.15.00790          198    23-12-2002      D. II                 239,872      193,022       89,952      50,598      455,382 33.74.140.015.011-0093.0         1,874           18,740,000      3,250,000.00
51 HM. 01018/KANDRI                    SITI KALIMAH               11.01.14.15.00943          202    23-12-2002      D. II                 105,216       84,666       39,456      30,000      199,746 33.74.140.015.013-0190.0             822         22,605,000       40,250,000
52 HM. 00670/KANDRI                      SURATNO                  11.01.14.15.00820          206    23-12-2002      D. II                 187,264      150,689       70,224      39,501      355,509 33.74.140.015.011-0061.0         1,463           21,945,000
53 HM. 01605/KANDRI                  KODAT MARKORO                11.01.14.15.01424          210    24-12-2002      D. II                 307,968      247,818      115,488      64,962      584,658 33.74.140.015.016-0043.0         2,406           27,669,000
54 HM. 00623/KANDRI                 MOCHAMAD SULAINI              11.01.14.15.00772          214    24-12-2002      D. II                 318,976                   119,616      67,284      605,556 33.74.140.015.011-0031.0         2,492           37,380,000
55 HM. 01614/KANDRI                    MARGOYITNO                 11.01.14.15.01433          218    24-12-2002      D. II                 235,904      189,829       88,464      49,761      447,849 33.74.140.015.016-0178.0         1,843           27,645,000
56 HM. 01016/KANDRI                       YAHYA                   11.01.14.15.00941          222    24-12-2002      D. II                 114,304       91,979       42,864      30,000      216,999 33.74.140.015.013-0188.0             893         24,557,500
57 HM. 01017/KANDRI                       KHAMIM                  11.01.14.15.00942          226    24-12-2002      D. II                 111,104       89,404       41,664      30,000      210,924 33.74.140.015.013-0189.0             868         23,870,000
58 HM. 01014/KANDRI                       WAGINI                  11.01.14.15.00939          230    26-12-2002      D. II                 362,752      291,902      136,032      76,518      688,662 33.74.140.015.013-0086.0         2,834           80,769,000
59 HM. 01695/KANDRI                        ROWI                   11.01.14.15.01514          234    26-12-2002      D. II                 210,560      169,435       78,960      44,415      399,735 33.74.140.015.016-0016.0         1,645           16,450,000
60 HM. 01030/KANDRI                      MURTINAH                 11.01.14.15.01838          238    26-12-2002      D. II                 198,400                    74,400      41,850      376,650 33.74.140.015.013-0096.0         1,550           38,750,000
61 HM. 01019/KANDRI                       JUMIATI                 11.01.14.15.00944          242    26-12-2002      D. II                 104,064       83,739       39,024      30,000      197,559 33.74.140.015.013-0191.0             813         22,357,500
62 HM. 01020/KANDRI                     KOMARIYAH                 11.01.14.15.01828          246    26-12-2002      D. II                  91,520       73,645       34,320      30,000      173,745 33.74.140.015.013-0192.0             715         19,662,500
63 HM. 00715/KANDRI                      NGATINAH                 11.01.14.15.01875          250    26-12-2002      D. II                 257,152      206,927       96,432      54,243      488,187 33.74.140.015.013-0121.0         2,009           80,360,000
64 HM. 00688/KANDRI                       TOHIRIN                 11.01.14.15.01848            7     20-1-2003      D. II                 335,872      270,272      125,952      70,848      637,632 33.74.140.015.013-0103.0         2,624           74,784,000
65 HM. 01649/KANDRI                   SITI MAEMONAH               11.01.14.15.01468           11     20-1-2003      D. I                   78,464       63,139       29,424      30,000      148,959 33.74.140.015.016-0188.0             613          9,195,000
66 HM. 00624/KANDRI                       DAMSIRI                 11.01.14.15.00773           15     20-1-2003      D. II                 293,120      235,870      109,920      61,830      556,470 33.74.140.015.011-0032.0         2,290           34,350,000
67 HM. 01554/KANDRI                    ARIS ARIYANTO              11.01.14.15.01373           19     21-1-2003      D. II                                                        31,200      234,252                                      964         24,400,000
68 HM. 01577/KANDRI                       MUYADI                  11.01.14.15.01396           23     21-1-2003      D. II                 750,976      604,301      281,616     158,409     1,827,576 33.74.140.015.016-0020.0        5,857          102,497,500
69 HM. 01558/KANDRI                     SOFANIDAH                 11.01.14.15.01377           27     21-1-2003      D. II                 351,232      282,632      131,712      74,088      666,792 33.74.140.015.016-0174.0         2,744           68,600,000
70 HM. 01027/KANDRI                       MUSIAH                  11.01.14.15.01835           31     22-1-2003      D. II                  97,152       78,177       36,432      30,000      184,437 33.74.140.015.013-0197.0             759         13,662,000
71 HM. 01922/KANDRI          KUS'AN, KUSMIYARDI, KUSLIYANTO, Cs   11.0114.15.02209            35     22-1-2003      D. II                 809,600      651,475      303,600     170,775     1,970,243 33.74.140.015.016-0208.0        6,325          101,200,000
72 HM. 01031/KANDRI                      SITI AISAH               11.01.14.15.01839           39     22-1-2003      D. II                 195,456      157,281       73,296      41,229      371,061 33.74.140.015.013-0097.0         1,527           38,175,000
73 HM. 00716/KANDRI                       SUMADI                  11.01.14.15.01876           43     23-1-2003      D. II                 696,960      560,835      261,360     147,015     1,696,121 33.74.140.015.013-0122.0        5,445          217,800,000
74 HM.01026/ KANDRI                      MUSIATUN                                             47     23-1-2003      D.II                  114,432       92,082                               217,242 33.74.140.015.013.0093.0             894         16,092,000
75 HM. 01540/KANDRI                PANDHU HIDAYAT JATI            11.01.14.15.01359           51    23-01-2003      D. II                  59,648       47,998       22,368      30,000      113,238 33.74.140.015.016-0151.0             466         17,475,000
76 HM. 01541/KANDRI               DHIMAS AGUNG HARYADI            11.01.14.15.01360           55    24-01-2003      D. II                  50,048       40,273       18,768      30,000       95,013 33.74.140.015.016-0150.0             391         14,662,500
77 HM. 01542/KANDRI                  UMI NUR HIDAYAH              11.01.14.15.01361           59     24-1-2003      D. II                  51,584                    19,344      30,000       97,929 33.74.140.015.016-0198.0             403         15,112,500
78 HM. 01543/KANDRI             SOEDIRDJO AGUNG RAHARDJO          11.01.14.15.01362           63     24-1-2003      D. II                  57,216       46,041       21,456      30,000      108,621 33.74.140.015.016-0103.0             447         16,762,500
79 HM. 01521/KANDRI                      MUSLIMAH                 11.01.14.15.00721           67     25-1-2003      D. II                  80,546       64,124       28,152      30,000      156,400 33.74.140.015.010-0081.0             782         15,640,000
80 HM. 01522/KANDRI                     SRI IDAYUMI               11.01.14.15.00722           71     25-1-2002      D. II                  77,147       61,418       26,964      31,200      149,800 33.74.140.015.010-0082.0             749         14,980,000
81 HM. 01523/KANDRI                    TRI WAHYUNI                11.01.14.15.00723           75     25-1-2003      D. II                  76,220       60,680       26,640      30,000      148,000 33.74.140.015.010-0083.0             740         14,800,000
82 HM. 01524/KANDRI                        SATINI                 11.01.14.15.00724           79     27-1-2003      D. II                 152,955      121,770       53,460      30,000      297,000 33.74.140.015-010-0045.0         1,485           29,700,000
83 HM. 01546/KANDRI                 MUHAMAD ZAENUDI               11.01.14.15.01365           83     27-1-2003      D. II                  69,248                    25,968      30,000      131,463 33.74.140.015.016-0171.0             541         20,287,500
84 HM. 01684/KANDRI                       ROHADI                  11.01.14.15.01503           87     28-1-2003      D. II                 467,840      376,465      175,440      98,685      888,165 33.74.140.015.016-0065.0         3,655           34,722,500
85 HM. 00696/KANDRI              Hj RA SRI SUMANI EFFENDHY        11.01.14.15.01856           91     29-1-2003      D. II                 135,424      108,974       50,784      30,000      257,094 33.74.140.015.013-0183.0         1,058           16,119,000
86 HM. 00697/KANDRI              Hj RA SRI SUMANI EFFENDHY        11.01.14.15.01857           95     29-1-2003      D. II                 375,680      302,305                   79,245      713,205 33.74.140.015.013-0219-0         2,935           44,714,800
87 HM. 00698/KANDRI              Hj RA SRI SUMANI EFFENDHY        11.01.14.15.01858           99     29-1-2003      D. II                 446,720      359,470      167,520      94,230      848,070 33.74.140.015.013-0110.0         3,490           53,170,200
88 HM. 01015/KANDRI                      KARMADI                  11.01.14.15.00940          103     30-1-2003      D. II                 267,904      215,579      100,464      56,511      508,599 33.74.140.015.013-0087.0         2,093           57,557,500
89 HM. 00704/KANDRI              Hj RA SRI SUMANI EFFENDHY        11.01.14.15.01864          107     30-1-2003      D. II                 365,440      294,065      137,040      77,085      693,765 33.74.140.015.013-0116.0         2,855           43,496,000
90 HM. 01648/KANDRI                     NUR ARIFIN                11.01.14.15.01467          111     31-1-2003      S. IV                  80,512       64,787       30,192      30,000      152,847 33.74.140.015.016-0203.0             629          9,435,000
91 HM. 01520/KANDRI                    BEJO bin MIAN              11.01.14.15.00720          115     31-1-2003      D. II                 486,263      387,122      169,956      94,420      944,200 33.74.140.015.010-0044.0         4,721          106,222,500
92 HM. 00629/KANDRI                      MUSTAIN                  11.01.14.15.00779            2     22-2-2003      D. I                  539,904      434,454      202,464     113,886     1,214,784 33.74.140.015.011-0046.0        3,488           34,880,000
93 HM. 01594/KANDRI                       SATINAH                 11.01.14.15.01413            6     22-2-2003      D. II                 122,880       98,880       46,080      30,000      233,280 33.74.140.015.016-0153.0             960         12,000,000
94 HM. 01576/KANDRI                       MUYADI                  11.01.14.15.01395            5     26-3-2003      S. IV                 458,752      369,152      172,032      96,768      870,912 33.74.140.015.016-0023.0         3,584           62,720,000
95 HM. 01597/KANDRI                      SARIYATI                 11.01.14.15.01416            9     26-3-2003      D. II                  82,432       66,332       30,912      30,000      156,492 33.74.140.015.016-0152.0             644          8,050,000       10,000,000
96 HM. 01608/KANDRI                     SUPARIYAH                 11.01.14.15.01427           13     27-3-2003      S. IV                 185,984      149,659       69,744      39,231      353,079 33.74.140.015.016-0166.0         1,453           16,709,500
97 HM. 00207/KANDRI                  RICARDO JEMMY D              11.01.14.15.00947           17     28-3-2003      D. IV                 126,976      102,176       47,616      30,000      241,056 33.74.140.015.014-0008.0             992         39,680,000
98 HM. 00209/KANDRI                   RONALDI JESSY D             11.01.14.15.00949           21     28-3-2003      D. IV                 145,536      117,111       54,576      30,000      276,291 33.74.140.015.014-0354.0         1,137           45,480,000
99 HM. 00210/KANDRI                  ROZANTIE JOICE D             11.01.14.15.00950           25     28-3-2003      D. IV                 130,432      104,957       48,912      30,000      247,617 33.74.140.015.014-0355.0         1,019           40,760,000
100 HM. 01040/KANDRI                     RUSMADI                  11.01.14.15.01895            5     25-4-2003      S. III                435,584      350,509      163,344      91,881      826,929 33.74.140.015.013-0193.0         3,403           76,567,500
101 HM. 01646/KANDRI                      SUPARTI                 11.01.14.15.01465            9    26-04-2003      S. IV                 338,688      272,538      127,008      71,442      642,978 33.74.140.015.016-0193.0         2,646           39,690,000
102 HM. 01022/KANDRI                  H. CHOLIL YUSAK             11.01.14.15.01830           13    28-04-2003      S. IV                 529,664      426,214      198,624     111,726     1,191,744 33.74.140.015.013-0091.0        4,138           82,760,000
103 HM. 01606/KANDRI                       SUGIRI                 11.01.14.15.01425           17    29-04-2003      S. IV                 236,672                    88,752      49,923      449,307 33.74.140.015.016-0042.0         1,849           18,490,000
104 HM. 01573/KANDRI                    ALMUKAYAH                 11.01.14.15.01392           21    30-04-2003      S. IV                  80,256       64,581       30,096      30,000      152,361 33.74.140.015.016-0121.0             627         10,972,500
105 HM. 01574/KANDRI                      SOLIKIN                 11.01.14.15.01393            2    20-05-2003      S. IV                  94,208       75,808       35,328      30,000      178,848 33.74.140.015.016-0137.0             736         12,880,000
106 HM. 01572/KANDRI                      ASPIAH                  11.01.14.15.01391            6    20-05-2003      S. IV                 116,992       94,142       43,872      30,000      222,102 33.74.140.015.016-0022.0             914         15,995,000
107 HM. 01604/KANDRI                      ASBARI                  11.01.14.15.01423           10    21-05-2003      S. IV                 652,672      525,197      244,752     137,673     1,588,343 33.74.140.015.016-0045.0        5,099           76,485,000
108 HM. 00208/KANDRI                 RAMONO JEFFRY D              11.01.14.15.00948           14    21-05-2003      D. IV                 164,352      132,252       61,632      34,668      312,012 33.74.140.015.014-0002.0         1,284           53,928,000
109 HM. 01650/KANDRI                    ROHIYATUN                 11.01.14.15.01469           18    22-05-2003      S. IV                 187,008      150,483       70,128      39,447      355,023 33.74.140.015.016-0089.0             884         13,260,000
110 HM. 01021/KANDRI                     NURYADI                  11.01.14.15.01828           22    22-05-2003      S. IV                 309,888      249,363      116,208      65,367      588,303 33.74.140.015.013-0195.0         2,421           60,525,000
111 HM. 00687/KANDRI                       TASRI                  11.01.14.15.01847           26    23-05-2003      D. II                 259,328      208,678       97,248      54,702      504,711 33.74.140.015.013-0102.0         2,026           56,728,000
Page 2
112 HM. 00693/KANDRI                JUYANAH                 11.01.14.15.01853    30   23-05-2003   D. II            480,000    386,250   180,000   101,250     911,250 33.74.140.015.013-0106.0     3,750    93,750,000
113 HM. 01705/KANDRI               SUYATMAN                 11.01.14.15.01524    34   24-05-2003   D. II            296,064    238,239   111,024    62,451     562,059 33.74.140.015.016-0015.0     2,313    23,130,000
114 HM. 01025/KANDRI               SUMIHARTO                11.01.14.15.01833    38   24-05-2003   D. II            124,032     99,807    46,512    30,000     235,467 33.74.140.015.013-0092.0      969     17,442,000
115 HM. 00702/KANDRI                 SUKADI                 11.01.14.15.01862    42   26-05-2003   D. II            466,944    375,744   175,104    98,496     886,464 33.74.140.015.013-0114.0     3,648    63,840,000
116 HM. 00672/KANDRI                 IKHSAN                 11.01.14.15.00822    46   26-5-2003    D. II            315,008    253,483   118,128    66,447     598,023 33.74.140.015.011-0062.0     2,461    43,067,500
117 HM. 00993/KANDRI                SUMAERI                 11.01.14.15.00918    50   27-5-2003    D. II            101,888     81,988    38,208    30,000     193,428 33.74.140015.013-0172.0       796     20,000,000
118 HM. 01561/KANDRI                 SUHARI                 11.01.14.15.01380     8   28-6-2003    D. II            174,464    140,389    65,424    36,801     331,209 33.74.140.015.016-0168.0     1,363    28,623,000
119 HM. 01611/KANDRI                DJUWARI                 11.01.14.15.01430    12   28-06-2003   S. IV            360,576    290,151   135,216    76,059     684,531 33.74.140.015.016-0059.0     2,687    40,305,000
120 HM. 00992/KANDRI             AMBAN ROEBIAH              11.01.14.15.00917    16   30-06-2003   D. II            810,112    275,834   128,544    72,306     650,754 33.74.140.015.013-0171.0     2,678    70,000,000
121 HM. 00641/KANDRI               RUSYATUN                 11.01.14.15.00791    20   30-6-2003    D. II            254,464    204,764    95,424    53,676     483,084 33.74.140.015.011-0092.0     1,988    23,856,000
122 HM. 00808/KANDRI      AKHMAD MUSYAFAK bin ROCHMAD       11.01.14.15.00364     1   07/01/2003   D. II            207,442    165,148    72,504    40,280     402,800 33.74.140.015.012-0014.0     2,014    80,000,000
123 HM. 00656/KANDRI                EKO WATI                11.01.14.15.00806     5   07/01/2003   D. II            500,352    402,627   187,632   105,543     949,887 33.74.140.015.011-0058.0     3,909    80,000,000
124 HM. 01926/KANDRI                  KASTI                 11.0114.15.02253      9   07/02/2003   D. II            401,408    323,008   150,528    84,672     789,750 33.74.140.015.013-0135.0     3,720   130,000,000
125 HM. 01697/KANDRI                 SOFIYAH                11.01.14.15.01516    13   07/02/2003   D. II            492,800    396,550   184,800   103,950     935,550 33.74.140.015.016-0161.0     3,850    42,350,000
126 HM. 01631/KANDRI                MARTI'AH                11.01.14.15.01450    17   07/03/2003   D. I     PAID                78,589    36,624    30,000     185,409 33.74.140.015.016-0099.0      763     11,445,000
127 HM. 01931/KANDRI       WARTINAH, TARUDI, MUSIYATI       11.0114.15.02250     21   07/03/2003   D. II            206,080    165,830    77,280    43,470     413,829 33.74.140.015.013-0198.0     1,703    30,654,000
128 HM. 01923/KANDRI      FAHRUR, MATROZI, SITI MUNJIATI    11.0114.15.02254     25   07/04/2003   S. IV            123,904     99,704    46,464    30,000     278,784 33.74.140.015.016-0030.0     1,700    17,000,000
129 HM. 01592/KANDRI                KOTIMAH                 11.01.14.15.01411    29   07/04/2003   D. II            358,016    288,091   134,256    75,519     679,671 33.74.140.015.016-0003.0     2,797    27,970,000
130 HM. 00695/KANDRI                 RIYATI                 11.01.14.15.01855    33   07/05/2003   D. I             133,504    107,429    50,064    30,000     253,449 33.74.140.015.013-0203.0     1,043    26,075,000
131 HM. 00734/KANDRI                SUMARNI                 11.01.14.15.01897    37   07/05/2003   D. II            160,000    128,750    60,000    33,750     303,750 33.74.140.015.013-0108.0     1,250    31,250,000
132 HM. 01513/KANDRI          WIDODO NOTO PRAWIRO           11.01.14.15.00713    41   07/07/2003   D. II            229,999    183,106    80,388    44,660     446,600 33.74.140.015.010-0021.0     2,233    55,825,000
133 HM. 01575/KANDRI          WIDODO NOTO PRAWIRO           11.01.14.15.01394    45   07/07/2003   D. II            311,040    250,290   116,640    65,610     590,490 33.74.140.015.016-0123.0     2,430    30,375,000
134 HM. 01578/KANDRI          WIDODO NOTO PRAWIRO           11.01.14.15.01397    49   07/08/2003   D. II            158,208    127,308    59,328    33,372     300,348 33.74.140.015.016-0159.0     1,236    19,776,000
135 HM. 01579/KANDRI          WIDODO NOTO PRAWIRO           11.01.14.15.01398     7   10/06/2003   D. II            230,656    185,606    86,496    48,654     437,886 33.74.140.015.016-0157..0    1,802    27,030,000
136 HM. 01670/KANDRI                SARIYATI                11.01.14.15.01489    11   10/08/2003   D. II            163,840    131,840    61,440    34,560     311,040 33.74.140.015.016-0087.0     1,280    19,200,000
137 HM. 01580/KANDRI          WIDODO NOTO PRAWIRO           11.01.14.15.01399    15   10/11/2003   D. II            242,432    195,082    90,912    51,138     460,242 33.74.140.015.016-0019.0     1,894    28,410,000
138 HM. 00694/KANDRI                 SUHADI                 11.01.14.15.01854    19   15-10-2003   D. I             168,064    135,239    63,024    35,451     319,059 33.74.140.015.013-0107.0     1,313    32,825,000
139 HM. 00682/KANDRI                 TUMIDI                 11.01.14.15.00832    23   16-10-2003   D. III           353,152    284,177   132,432    74,493     670,437 33.74.140.015.011-0070.0     2,759    27,590,000
140 HM. 01581/KANDRI          WIDODO NOTO PRAWIRO           11.01.14.15.01400    27   18-10-2003   D. II            180,992    145,642    67,872    38,178     343,602 33.74.140.015.016-0158.0     1,414    21,210,000
141 HM. 00663/KANDRI           ISMAIL, SITI RIKANAH         11.01.14.15.00813    31   20-10-2003   D. II            232,704    187,254    87,264    49,086     441,774 33.74.140.015.011-0065.0     1,818    31,815,000
142 HM. 01598/KANDRI                RUKAYAH                 11.01.14.15.01417    35   21-10-2003   D. II            270,848    217,948   101,568    57,132     526,338 33.74.140.015.016-0154.0     2,166    27,075,000
143 HM. 00721/KANDRI                 IMYATI                 11.01.14.15.01881    39   23-10-2003   D. II            529,808    426,008   198,528   111,672    1,191,168 33.74.140.015.013-0128.0    4,297   135,355,500
144 HM. 00692/KANDRI            NOVI AMBARWATI              11.01.14.15.01852    43   25-10-2003   D. II            130,048    104,648    48,768    30,000     246,888 33.74.140.015.013-0105.0     1,016    32,004,000
145 HM. 01028/KANDRI               SUJARWADI                11.01.14.15.01836    47   27-10-2003   D. II            427,008    343,608   160,128    90,072     810,648 33.74.140.015.013-0094.0     3,336    91,740,000
146 HM. 01582/KANDRI          WIDODO NOTO PRAWIRO           11.01.14.15.01401    51   28-10-2003   D. II            236,928    190,653    88,848    49,977     449,793 33.74.140.015.016-0018.0     1,851    24,063,000
147 HM. 01927/KANDRI               ABDUL HADI               11.0114.15.02256     55   29-10-2003   D. II                                            31,200     468,261                              1,927    23,124,000
148 HM. 01583/KANDRI          WIDODO NOTO PRAWIRO           11.01.14.15.01402    59   30-10-2003   D. II            195,200    157,075    73,200    41,175     370,575 33.74.140.015.016-0008.0     1,525    19,825,000
149 HM. 00619/KANDRI                  BAKRI                 11.01.14.15.00768    63   30-10-2003   D. II            370,816    298,391   139,056    78,219     703,971 33.74.140.015.011.0037.0     2,897    72,425,000
150 HM. 01591/KANDRI                  BEJO                  11.01.14.15.01410    67   31-10-2003   D. II            705,152    567,427   264,432   148,743    1,716,058 33.74.140.015.016-0002.0    5,509    55,090,000
151 HM. 01708/KANDRI                 RUSLAN                 11.01.14.15.01527     6   11/10/2003   S. IV            266,880    214,755   100,080    56,295     506,655 33.74.140.015.016-0165.0     2,077    25,962,500
152 HM. 01029/KANDRI    AHMAD NAIMIN, MUH ARIFIN, NASIKUN   11.01.14.15.01837    13   19-11-2003   D. II            366,464    294,889   137,424    77,301     695,709 33.74.140.015.013-0095.0     2,863    74,438,000
153 HM. 01593/KANDRI                 SARMIDI                11.01.14.15.01412    17   20-11-2003   D. II            206,336    166,036    77,376    43,524     391,716 33.74.140.015.016-0010.0     1,612    20,150,000
154 HM. 01595/KANDRI               MUSTAKIM                 11.01.14.15.01414    21   20-11-2003   D. II            314,624    253,174   117,984    66,366     597,294 33.74.140.015.016-0205.0     2,458    30,725,000
155 HM. 01647/KANDRI                 HUFRON                 11.01.14.15.01466    25   21-11-2003   S. IV            187,264    150,689    70,224    39,501     355,509 33.74.140.015.016-0098.0     1,463    22,500,000
156 HM. 01008/KANDRI                DAWAMIN                 11.01.14.15.00933     6   17-12-2003   D. II           2,136,576   859,638   400,608   225,342    4,056,156 33.74.140.015.013-0181.0    8,346   300,000,000
157 HM. 01596/KANDRI                 KOIMAN                 11.01.14.15.01415    10   18-12-2003   D. II            257,408    207,133    96,528    54,297     488,673 33.74.140.015.016-0206.0     2,011    25,137,500
158 HM. 00630/KANDRI                MUYANAH                 11.01.14.15.00780    14   18-12-2003   D. II            254,720    204,970    95,520    53,730     483,570 33.74.140.015.011-0047.0     1,990    17,910,000
159 HM. 01711/KANDRI   MUSAWAROTUL LISAKDIYAH, MIFTAKUL M   11.01.14.15.01530   18    19-12-2003   D. II            190,080    152,955    71,280    40,095     360,855 33.74.140.015.016-0012.0     1,485    16,335,000
160 HM. 00723/KANDRI            ENDANG RUKMINI              11.01.14.15.01883     2   01/10/2004   D. II            223,360    179,735    83,760    47,115     479,196 33.74.140.015.013-0209.0     1,972    49,300,000   18,300,000
161 HM. 01671/KANDRI             ACHMAD NASIR               11.01.14.15.01490     9   23-01-2004   D. II            334,336    269,036   125,376    70,524     634,716 33.74.140.015.016-0088.0     2,612    52,240,000
162 HM. 01679/KANDRI              SUHARIYONO                11.01.14.15.01498    13   23-1-2004    D. I             563,840    453,715   211,440   118,935    1,268,640 33.74.140.015.016-0071.0    4,722    94,440,000
163 HM. 00615/KANDRI                 SARMAN                 11.01.14.15.00764     1   02/05/2004   D. III           307,200    247,200   115,200    64,800     583,200 33.74.140.015.011-0026.0     2,400    72,000,000
164 HM. 01627/KANDRI           DRS. H.A.M ARCHAM            11.01.14.15.01446     5   02/05/2004   D. II             95,488     76,838    35,808    30,000     181,278 33.74.140.015.016-0083.0      746     11,190,000    7,750,000
165 HM. 01557/KANDRI               AMINI SURI               11.01.14.15.01376     9   02/05/2004   D. II            253,824    204,249    95,184    53,541     481,869 33.74.140.015.016-0057.0     1,983    54,532,500
166 HM. 00631/KANDRI                JUMIYATI                11.01.14.15.00781    13   02/05/2004   D. II            321,280    258,530   120,480     67770       609930 33.74.140.015.011-0048.0    2,111    21,110,000
167 HM. 01928/KANDRI               KUSLIYANTO               11.0114.15.02259     18   02/06/2004   S. IV            264,960    213,210    99,360    55,890     503,010 33.74.140.015.016-0118.0     1,770    30,975,000
168 HM. 00669/KANDRI            JANUDI, NGARPIAH            11.01.14.15.00819    20   02/12/2004   D. II            159,872    128,647    59,952    33,723     303,507 33.74.140.015.011-0060.0     1,249    24,980,000
169 HM. 01706/KANDRI            SAWINI WAKIMAN              11.01.14.15.01525     1   03/03/2004   D. II            467,968    376,568   175,488    98,712     986,337 33.74.140.015.016-0011.0     4,059    50,737,500
170 HM. 00724/KANDRI               MUNJAROAH                11.01.14.15.01884     5   03/03/2004   D. II            484,352    389,752   181,632   102,168    1,089,792 33.74.140.015.013-0212.0    4,445   122,237,500
171 HM. 00714/KANDRI                 ASPARI                 11.01.14.15.01874     9   18-3-2004    D. II            277,504    223,304   104,064    58,536     526,824 33.74.140.015.013-0124.0     2,168    81,300,000
172 HM. 00676/KANDRI               NUR ARIFIN               11.01.14.15.00826    13   18-3-2004    D. III           243,968    196,318    91,488    51,462     463,158 33.74.140.015.011-0114.0     1,906    33,355,000
173 HM. 00706/KANDRI                 MUSLIH                 11.01.14.15.01866    17   26-03-2004   D. II            810,112    651,887   303,792   170,883    1,971,490 33.74.140.015.013-0130.0    5,401   148,527,500
174 HM. 01607/KANDRI                 JAHURI                 11.01.14.15.01426    21   26-3-2004    D. II            340,736    274,186   127,776    71,874     646,866 33.74.140.015.016-0044.0     2,662    46,585,000   15,500,000
175 HM. 00673/KANDRI            UNTUNG KUSIONO              11.01.14.15.00823     3   13-4-2004    D. II            199,040    160,165    74,640    41,985     377,865 33.74.140.015.011-0111.0     1,344    26,880,000
176 HM. 00671/KANDRI                SRI KANTI               11.01.14.15.00821     7   21-04-2004   D. II            350,592    282,117   131,472    73,953      665,577 33.74.140.015.011-0112.0    2,739    54,780,000
177 HM. 6/KANDRI            MARSELUS SRIENDRO UTOMO         ~                     2   04/04/2004   D. II                                                     10,716,570 33.74.140.015.013-0101.0   14,590   948,350,000
                                                                                                                   5,532,492                       658,464
178 HM. 1/CEPOKO            MARSELUS SRIENDRO UTOMO         ~                     6   05/04/2004   D. II                                                              - 33.74.140.015.013-0101.0    6,655   432,575,000
179 HM. 00636/KANDRI                NUR HADI                11.01.14.15.00786    17   27-5-2004    D. II            568,064    457,114   213,024   119,826    1,278,144 33.74.140.015.011-0052.0    4,438    55,475,000    2,000,000
180 HM. 00711/KANDRI                ASROKAH                 11.01.14.15.01871     3   22-06-2004   D. II            254,848               95,568    53,757     483,813 33.74.140.015.013-0125.0     1,991    72,000,000
181 HM. 00733/KANDRI              MUHRAMIN, SA              11.01.14.15.01896     1   07/02/2004   D. II            518,400    417,150   194,400   109,350     984,150 33.74.140.015.013-0204.0     4,050    81,000,000
182 HM. 01688/KANDRI                 TRIYUNI                11.01.14.15.01507     5   07/02/2004   D. II            328,448    264,298   123,168    69,282     623,538 33.74.140.015.016-0038.0     2,566    35,924,000
183 HM. 00699/KANDRI              MUHRAMIN, SA              11.01.14.15.01859     9   07/02/2004   D. II            135,040    108,665    50,640    30,000     256,365 33.74.140.015.013-0112.0     1,055    21,100,000
184 HM. 01585/KANDRI            SURADI, MUKINAH             11.01.14.15.01404    40   24-7-2004    D. II            275,072    221,347   103,152    58,023     522,207 33.74.140.015.016-0005.0     2,149    38,682,000
185 HM. 01657/KANDRI            UNTUNG KUSIONO              11.01.14.15.01476    44   24-07-2004   S. III            36,352     29,252    13,632    30,000      69,012 33.74.140.015.016-0177.0      284      4,260,000
186 HM. 00674/KANDRI               KARMINAH                 11.01.14.15.00824     3   08/06/2004   D. II            260,736    209,811    97,776    54,999     494,991 33.74.140.015.011-0113.0     2,030    38,570,000
187 HM. 01511/KANDRI         SRI WAHYUDIN SYAMSIYAH         11.01.14.15.00711     6   23-9-2004    D. II             82,240     65,792    32,896    30,000     146,490 33.74.140.015.011-0087.0     2,730    68,250,000
188 HM. 01512/KANDRI            AGUS SULISTIYONO            11.01.14.15.00712    10   23-09-2004   D. II             84,640     67,712    33,856    30,000     150,765 33.74.140.015.011-0024.0     2,279    56,975,000
189 HM. 01696/KANDRI               SUNARIYAH                11.01.14.15.01515     7   10/12/2004   D. II            443,264    356,689   166,224    93,501     841,509 33.74.140.015.016-0033.0     3,463    48,482,000
190 HM. 00657/KANDRI                  AS'ARI                11.01.14.15.00807    11   10/12/2004   D. II            208,384    167,684    78,144    43,956     395,604 33.74.140.015.011-0077.0     1,628    29,304,000
191 HM. 01589/KANDRI                  PARNI                 11.01.14.15.01408    35   27-10-2004   D. II            528,768    425,493   198,288   111,537    1,189,728 33.74.140.015.016-0124.0    4,939    88,902,000    9,750,000
192 HM. 00685/KANDRI                MURO'AH                 11.01.14.15.00835     2   12/07/2004   D. II            461,184    371,109   172,944    97,281     875,529 33.74.140.015.011-0054.0     3,435    44,655,000
193 HM. 01586/KANDRI                SUMARNI                 11.01.14.15.01405    13   30-12-2004   S. III           238,080    191,580    89,280    50,220     451,980 33.74.140.015.016-0149.0     1,860    33,480,000
194 HM. 01588/KANDRI                SUTARNO                 11.01.14.15.01407    17   30-12-2004   S. III           231,808    186,533    86,928    48,897     440,073 33.74.140.015.016-0004.0     1,811    32,598,000
195 HM. 01682/KANDRI                NASOKAH                 11.01.14.15.01501    21   30-12-2004   S. IV            429,184    345,359   160,944    90,531     814,779 33.74.140.015.016-0062.0     3,353    65,383,500
196 HM. 01707/KANDRI        MUHAMAD DAVID SETYAWAN          11.01.14.15.01526    26   30-12-2004   D. II            227,456    183,031    85,296    47,979     431,811 33.74.140.015.016-0138.0     1,777    26,655,000
197 HM. 01002/KANDRI                RAPIYAH                 11.01.14.15.00927    30   31-12-2004   D. II            278,528    224,128   104,448    58,752     528,768 33.74.140.015.013-0079.0     2,176    97,920,000
198 HM. 01933/KANDRI                SUMIRAH                 11.0114.15.02270     34   31-12-2004   S. IV            161,664    130,089    60,624    34,101     363,744 33.74.140.015.016-0155.0     1,498    14,980,000
199 HM. 00994/KANDRI           MUHAMAD SAEFODIN             11.01.14.15.00919     1   01/08/2005   D. II             96,512     77,662    36,192    31,200     183,222 33.74.140.015.013.0173.0      754     22,620,000
200 HM. 01698/KANDRI                SUKIYAH                 11.01.14.15.01517     5   01/03/2005   D. II            439,936    354,011   164,976    92,799     835,191 33.74.140.015.016-0162.0     3,437    60,147,500    9,750,000
201 HM. 00659/KANDRI                 SUGIRI                 11.01.14.15.00809    84   29-11-2006   D. III           283,136    227,836   106,176    59,724     537,516 33.74.140.015.011-0056.0     2,212    44,240,000
202 HM. 00664/KANDRI                 YULIATI                11.01.14.15.00814    88   29-11-2006   D. II            420,352    338,252   157,632    88,668     798,012 33.74.140.015.011-0064.0     3,284    65,680,000
203 HM. 01934/KANDRI             DRS. SOENARNO              11.01.14.15.02271    92   29-11-2006   D. II            209,090    166,460    73,080    40,600     446,000 33.74.140.015.012-0073.0     2,230   100,350,000    9,750,000
204 HM. 00717/KANDRI             YOHANES YOPIE              11.01.14.15.01877    96   30-11-2006   D.II             600,192    482,967   225,072   131,667    1,350,432 33,74,140,015,013-0220,0    4,689   281,340,000
205 HM. 00731/KANDRI      YOHANES YOPIE, HANA ERNAWATI      11.01.14.15.01891   100   30-11-2006   D. II            208,128    167,478    78,048    43,902     395,118 33.74.140.015.013-0123.0     1,626    89,430,000
206 HM. 00718/KANDRI             RENITA JUWITA              11.01.14.15.01878   104   30-11-2006   D. II            101,376               38,016    30,000     192,456 33.74.140.015.013-0208.0      792     39,600,000
207 HM. 00661/KANDRI               LISTIYOWATI              11.01.14.15.00811     2   12/07/2006   D. III           139,904    112,579    52,464    30,000     265,599 33.74.140.015.011-0105.0     1,093    20,220,500
208 HM. 01037/KANDRI                 RUSMAN                 11.01.14.15.01845     6   12/07/2006   D. II            319,744    257,294   119,904    67,446     607,014 33.74.140.015.013-0098.0     2,498   125,000,000
209 HM. 00686/KANDRI                 SUHARTI                11.01.14.15.01846    10   12/07/2006   D. II             95,616     76,941    35,856    30,000     181,521 33.74.140.015.013-0202.0      747     37,350,000
210 HM. 00675/KANDRI             EDRIS bin WIRYO            11.01.14.15.00825     4   02/07/2007   D. III           265,600    213,725    99,600    56,025     504,225 33.74.140.015.011-0063.0     2,075    41,500,000
211 HM. 00654/KANDRI                 ASRIATI                11.01.14.15.00804    18   15-02-2007   D. II            121,984     98,159    45,744    30,000     231,579 33.74.140.015.011-0057.0      953     17,630,500
212 HM. 00665/KANDRI                TURYATI                 11.01.14.15.00815    22   15-2-2007    D. II            127,232    102,382    47,712    30,000     286,272 33.74.140.015.011-0109.0     1,204    25,284,000
213 HM. 00725/KANDRI                 KHAMIM                 11.01.14.15.01885    30   28-2-2007    D. II            463,488    372,963   173,808    97,767     946,728 33.74.140.015.013-0213.0     3,896   202,592,000
214 HM. 01005/KANDRI                SURYANTI                11.01.14.15.00930     1   04/02/2007   D. II            688,896    554,346   258,336   145,314    1,676,498 33.74.140.015.013-0083.0    5,382   242,190,000
215 HM. 00690/KANDRI           KUWAT SUPRIYANTO             11.01.14.15.01850     5   04/02/2007   D. II            120,064     96,614    45,024    30,000     227,934 33.74.140.015.013-0201.0      938     39,396,000
216 HM. 00691/KANDRI                ISTIYANAH               11.01.14.15.01851     9   04/02/2007   D. II            110,976     89,301    41,616    30,000     210,681 33.74.140.015.013-0218.0      867     36,414,000
217 HM. 00689/KANDRI                 PUNIJAH                11.01.14.15.01849    13   04/02/2007   D. II            223,616    179,941    83,856    47,169     424,521 33.74.140.015.013-0104.0     1,747    73,374,000   29,950,000
218 HM. 00729/KANDRI                MUSTAIN                 11.01.14.15.01889    17   04/02/2007   D. II            592,000    476,375   222,000   124,875    1,332,000 33.74.140.015.013-0132.0    4,759   211,775,500
219 HM. 01890/KANDRI             ANI SETIYOWATI             1101.1415.2184       12   06/07/2007     ~                                                         267,300                              1,100    71,500,000
220 HM. 00710/KANDRI               SUJIYANTO                11.01.14.15.01870    26   20-7-2007    D. II            430,208    346,183   161,328    90,747     816,723 33.74.140.015.013-0119.0     3,361   218,465,000
221 HM. 01891/KANDRI               FAHRUROZI                1101.1415.2183       27   16-8-2007      ~              916,096    737,171   343,536   193,239    2,229,413 33.74.140.015.013-0118.0    5,969   387,985,000
222 HM. 00709/KANDRI         PIPIT DAMAI PRAETYAWAN         11.01.14.15.01869    31   16-8-2007    D. II            429,824    345,874   161,184    90,666     815,994 33.74.140.015.013-0207.0     3,358   218,270,000
223 HM. 00708/KANDRI               AGUS MUNIR               11.01.14.15.01868    35   16-8-2007    D. II            438,528    352,878   164,448    92,502     832,518 33.74.140.015.013-0206.0     3,426   222,690,000
224 HM. 00668/KANDRI                NURYATI                 11.01.14.15.00818    13   14-11-2007   D. II            142,208    114,433    53,328    30,000     269,973 33.74.140.015.011-0110.0     1,111    22,220,000
Page 3
143,680,461   JUMLAH HARGA PEROLEHAN      536,993     13,368,615,500      261,550,000
                BIAYA NOTARIS LAIN-LAIN                                765,156,600.00
                                TOTAL     536,993     13,368,615,500    1,026,706,600

                                                    TOTAL UMPM          14,395,322,100
Page 4
PT SILIWANGI BIMANTARA PERDANA
Advance Payment - Others
2024
 TANGGAL NO DOC.            REFF                                                              KETERANGAN                                                              DEBIT                        KREDIT                        SALDO                   KET2
30/09/2023   JM23090015                             Reclass Advance Receipt => Advance Payment / PEMBAYARAN 58 UNIT TOWER A PT POLLUX ADITAMA KENCANA / M123090014
                                                                                                                                                           36,720,169,658.00                                      -              36,720,169,658.00 PAK
30/09/2023   JM23090015                             Reclass Advance Receipt => Advance Payment / PEMBAYARAN UNIT TOWER A PT POLLUX ADITAMA KENCANA / M123090015
                                                                                                                                                             225,611,680.00                                       -              36,945,781,338.00 PAK
30/09/2023   JM23090015                             Reclass Advance Receipt => Advance Payment / PPN in atas sisa 28 unit tower A PT Pollux Aditama Kencana / JM23090013         -               1,882,806,111.00             35,062,975,227.00 PAK
02/10/2023   M123100002   -                         CICILAN PEMBAYARAN 15 TOWER A PT. POLLUX ADITAMA KENCANA                                                          3,750,000,000.00                            -              38,812,975,227.00 PAK
02/10/2023   M123100002   -                         CICILAN PEMBAYARAN TOWER A PT. POLLUX ADITAMA KENCANA                                                               225,968,287.00                            -              39,038,943,514.00 PAK
06/10/2023   M923100008                           0 Cicilan Pembayaran Tower A PT. Pollux Aditama Kencana                                                             1,000,000,000.00                            -              40,038,943,514.00 PAK
31/10/2023   JM23100011   M123090014,JM23090013     PPN atas 86 unit yang sudah terbit pada Sept 2023 / M123090014,JM23090013                                         5,922,024,773.00                            -              45,960,968,287.00 PAK
31/12/2023   JM23120019   AUD ADJ 23                Audit Adjustment 2023 / Uang muka Pembelian Apartemen Tower A PT Pollux Aditama Kencana Audit Adjustment 2023 6,632,800,343.00
                                                                                                                                                                  / Uang Muka PPN atas Pembelian Apartemen -Tower A PT Pollux Aditama Kencana PAK
                                                                                                                                                                                                                           52,593,768,630.00  (65 unit tahap 1, 123 unit + 1 HGB tahap 2)
16/04/2024   M124040002   M1                        CICILAN PEMBAYARAN TOWER A PT. POLLUX ADITAMA KENCANA                                                                185,000,000.00                               0          52,778,768,630.00 PAK
06/05/2024   M124050002   CB                        UANG MUKA PEMBELIAN APARTEMEN POLLUX ADITAMA KENCANA                                                                  77,050,000.00                               0          52,855,818,630.00 PAK
06/05/2024   M124050003   CB                        CICILAN PEMBAYARAN TOWER A PT. POLLUX ADITAMA KENCANA                                                                 40,088,729.00                               0          52,895,907,359.00 PAK
13/05/2024   M124050005   CB                        CICILAN PEMBAYARAN TOWER A PT. POLLUX ADITAMA KENCANA                                                                185,000,000.00                               0          53,080,907,359.00 PAK
31/05/2024   JM24050007   GL                        PPN atas 30 Unit Apartemen Tower C&D di Cikarang PT Pollux Aditama Kencana pada Mei 2024                        169,510,000.00                            -              53,250,417,359.00 PAK
31/05/2024   JM24050007   GL                        Pembelian 30 Unit apartemen Tower C&D di Cikarang PT Pollux Aditama Kencana pada Mei 2024                                   -              11,886,682,210.00             41,363,735,149.00 PAK
06/11/2024   M124110002   CB                        PEMBELIAN UNIT POLLUX ADITAMA KENCANA                                                                                137,000,000.00                               0          41,500,735,149.00 PAK
06/11/2024   M124110002   CB                        PEMBELIAN UNIT POLLUX ADITAMA KENCANA                                                                                250,000,000.00                               0          41,750,735,149.00 PAK
12/11/2024   M124110004   CB                        PEMBELIAN APARTEMEN POLLUX ADITAMA KENCANA                                                                             7,500,000.00                               0          41,758,235,149.00 PAK
14/11/2024   M124110006   CB                        PEMBELIAN APARTEMEN POLLUX ADITAMA KENCANA                                                                           177,500,000.00                               0          41,935,735,149.00 PAK
29/11/2024   M124110008   CB                        PEMBELIAN UNIT POLLUX ADITAMA KENCANA                                                                                145,312,633.00                               0          42,081,047,782.00 PAK
29/11/2024   M124110008   CB                        PEMBELIAN UNIT POLLUX ADITAMA KENCANA                                                                                250,000,000.00                               0          42,331,047,782.00 PAK
24/05/2024   M124050010   CB                        UANG MUKA PEMBELIAN UNIT PT. POLLUX BARELANG                                                                         200,000,000.00                               0          42,531,047,782.00 BARELANG
19/06/2024   M124060002   CB                        PEMBAYARAN CICILAN APARTEMEN POLLUX BARELANG                                                                         180,000,000.00                               0          42,711,047,782.00 BARELANG
21/07/2024   M124070005   CB                        UANG MUKA PEMBELIAN UNIT PT. POLLUX BARELANG MEGASUPERBLOK                                                           720,000,000.00                               0          43,431,047,782.00 BARELANG
31/12/2024   JM24120014   GL                        AUD ADJ 24 / Reclass General & Administration - Professional Fee - Legal Fee & Notary (H100-0801-0000) => Advance
                                                                                                                                                                          809,490,000.00
                                                                                                                                                                                 Payment - Others (A106-0204-0000) /0Biaya Perijinan
                                                                                                                                                                                                                                  44,240,537,782.00   LEGAL
                                                                                                                                                                                                                                     / karena belum selesai   FEE
                                                                                                                                                                                                                                                            pekerjaannya




                                                                                                                                                               58,010,026,103.00             13,769,488,321.00             44,240,537,782.00



                                                    PAK                                                                                                            42,331,047,782.00
                                                    BARELANG                                                                                                         1,100,000,000.00
                                                                                                                                                                       809,490,000.00
                                                                                                                                                                   44,240,537,782.00                44854857815 -              614,320,033.00
Page 5
CHADSTONE
TOWER A

  NO        Tower     Floor    Type     UNIT        View   SQM   Nett    NO. SERTI             NOP            HARGA INVESTASI     NJOP           NILAI AJB       PPN 11% AJB       PPh 2.5%        BPHTB 5%        TOTAL HJB       REIMBURSE FIT OUT        Nilai Roya New                         KETERANGAN         KETERANGAN
        1     A     FLOOR 06   3BR    A#C06-11   City       56   45.81     4432      32.18.022.007.013-0270         796,971,280     93,726,000      94,000,000        10,340,000       2,350,000       4,700,000     111,390,000              685,581,280           600,000,000   PT. SILIWANGI BIMANTARA PERDANA   TAHAP 1
        2     A     FLOOR 07   2BR    A#B07-06   Pool       42   30.53     4046      32.18.022.007.013-0285         597,728,460     63,879,000      64,000,000         7,040,000       1,600,000       3,200,000      75,840,000              521,888,460           450,000,000   PT. SILIWANGI BIMANTARA PERDANA   TAHAP 1
        3     A     FLOOR 07   2BR    A#B07-16   City       42   33.27     4054      32.18.022.007.013-0293         597,728,460     67,545,000      68,000,000         7,480,000       1,700,000       3,400,000      80,580,000              517,148,460           450,000,000   PT. SILIWANGI BIMANTARA PERDANA   TAHAP 1
        4     A     FLOOR 07   3BR    A#C07-01   Pool       56   44.97     4042      32.18.022.007.013-0281         796,971,280     91,893,000      92,000,000        10,120,000       2,300,000       4,600,000     109,020,000              687,951,280           600,000,000   PT. SILIWANGI BIMANTARA PERDANA   TAHAP 1
        5     A     FLOOR 07   3BR    A#C07-23   Golf       56   43.97     4061      32.18.022.007.013-0300         796,971,280     90,060,000      91,000,000        10,010,000       2,275,000       4,550,000     107,835,000              689,136,280           600,000,000   PT. SILIWANGI BIMANTARA PERDANA   TAHAP 1
        6     A     FLOOR 08   2BR    A#B08-16   City       42   33.27     3896      32.18.022.007.013-0313         597,728,460     67,545,000      68,000,000         7,480,000       1,700,000       3,400,000      80,580,000              517,148,460           450,000,000   PT. SILIWANGI BIMANTARA PERDANA   TAHAP 1
        7     A     FLOOR 08   3BR    A#C08-11   City       56   45.81     3893      32.18.022.007.013-0310         796,971,280     93,726,000      94,000,000        10,340,000       2,350,000       4,700,000     111,390,000              685,581,280           600,000,000   PT. SILIWANGI BIMANTARA PERDANA   TAHAP 1
        8     A     FLOOR 10   3BR    A#C10-01   Pool       56   44.97     4191      32.18.022.007.013-0341         796,971,280     91,893,000      92,000,000        10,120,000       2,300,000       4,600,000     109,020,000              687,951,280           600,000,000   PT. SILIWANGI BIMANTARA PERDANA   TAHAP 1
        9     A     FLOOR 10   3BR    A#C10-10   Pool       56   45.63     4212      32.18.022.007.013-0349         796,971,280     93,726,000      94,000,000        10,340,000       2,350,000       4,700,000     111,390,000              685,581,280           600,000,000   PT. SILIWANGI BIMANTARA PERDANA   TAHAP 1
       10     A     FLOOR 10   3BR    A#C10-11   City       56   45.81     4213      32.18.022.007.013-0350         796,971,280     93,726,000      94,000,000        10,340,000       2,350,000       4,700,000     111,390,000              685,581,280           600,000,000   PT. SILIWANGI BIMANTARA PERDANA   TAHAP 1
       11     A     FLOOR 11   3BR    A#C11-11   City       56   45.81     1867      32.18.022.007.013-0370         796,971,280     93,726,000      94,000,000        10,340,000       2,350,000       4,700,000     111,390,000              685,581,280           600,000,000   PT. SILIWANGI BIMANTARA PERDANA   TAHAP 1
       12     A     FLOOR 12   3BR    A#C12-11   City       56   45.81     2032      32.18.022.007.013-0390         796,971,280     93,726,000      94,000,000        10,340,000       2,350,000       4,700,000     111,390,000              685,581,280           600,000,000   PT. SILIWANGI BIMANTARA PERDANA   TAHAP 1
       13     A     FLOOR 16   2BR    A#B16-06   Pool       42   30.53     3540      32.18.022.007.013-0425         597,728,460     63,879,000      64,000,000         7,040,000       1,600,000       3,200,000      75,840,000              521,888,460           450,000,000   PT. SILIWANGI BIMANTARA PERDANA   TAHAP 1
       14     A     FLOOR 17   2BR    A#B17-07   Pool       42   33.19     3633      32.18.022.007.013-0446         597,728,460     67,545,000      68,000,000         7,480,000       1,700,000       3,400,000      80,580,000              517,148,460           450,000,000   PT. SILIWANGI BIMANTARA PERDANA   TAHAP 1
       15     A     FLOOR 17   2BR    A#B17-15   City       42   32.21     3639      32.18.022.007.013-0452         597,728,460     65,712,000      66,000,000         7,260,000       1,650,000       3,300,000      78,210,000              519,518,460           450,000,000   PT. SILIWANGI BIMANTARA PERDANA   TAHAP 1
       16     A     FLOOR 17   2BR    A#B17-20   Golf       42   33.27     3644      32.18.022.007.013-0457         597,728,460     67,545,000      68,000,000         7,480,000       1,700,000       3,400,000      80,580,000              517,148,460           450,000,000   PT. SILIWANGI BIMANTARA PERDANA   TAHAP 1
       17     A     FLOOR 17   3BR    A#C17-01   Pool       56   44.97     3628      32.18.022.007.013-0441         796,971,280     91,893,000      92,000,000        10,120,000       2,300,000       4,600,000     109,020,000              687,951,280           600,000,000   PT. SILIWANGI BIMANTARA PERDANA   TAHAP 1
       18     A     FLOOR 17   3BR    A#C17-10   Pool       56   45.63     3636      32.18.022.007.013-0449         796,971,280     93,726,000      94,000,000        10,340,000       2,350,000       4,700,000     111,390,000              685,581,280           600,000,000   PT. SILIWANGI BIMANTARA PERDANA   TAHAP 1
       19     A     FLOOR 17   3BR    A#C17-11   City       56   45.81     3637      32.18.022.007.013-0450         796,971,280     93,726,000      94,000,000        10,340,000       2,350,000       4,700,000     111,390,000              685,581,280           600,000,000   PT. SILIWANGI BIMANTARA PERDANA   TAHAP 1
       20     A     FLOOR 18   2BR    A#B18-06   Pool       42   30.53     4857      32.18.022.007.013-0465         597,728,460     63,879,000      64,000,000         7,040,000       1,600,000       3,200,000      75,840,000              521,888,460           450,000,000   PT. SILIWANGI BIMANTARA PERDANA   TAHAP 1
       21     A     FLOOR 18   2BR    A#B18-07   Pool       42   33.19     4858      32.18.022.007.013-0466         597,728,460     67,545,000      68,000,000         7,480,000       1,700,000       3,400,000      80,580,000              517,148,460           450,000,000   PT. SILIWANGI BIMANTARA PERDANA   TAHAP 1
       22     A     FLOOR 18   2BR    A#B18-15   City       42   32.21     4486      32.18.022.007.013-0472         597,728,460     65,712,000      66,000,000         7,260,000       1,650,000       3,300,000      78,210,000              519,518,460           450,000,000   PT. SILIWANGI BIMANTARA PERDANA   TAHAP 1
       23     A     FLOOR 18   2BR    A#B18-16   City       42   33.27     4487      32.18.022.007.013-0473         597,728,460     67,545,000      68,000,000         7,480,000       1,700,000       3,400,000      80,580,000              517,148,460           450,000,000   PT. SILIWANGI BIMANTARA PERDANA   TAHAP 1
       24     A     FLOOR 18   2BR    A#B18-19   Golf       42   33.43     4490      32.18.022.007.013-0476         597,728,460     67,545,000      68,000,000         7,480,000       1,700,000       3,400,000      80,580,000              517,148,460           450,000,000   PT. SILIWANGI BIMANTARA PERDANA   TAHAP 1
       25     A     FLOOR 18   2BR    A#B18-20   Golf       42   33.27     4491      32.18.022.007.013-0477         597,728,460     67,545,000      68,000,000         7,480,000       1,700,000       3,400,000      80,580,000              517,148,460           450,000,000   PT. SILIWANGI BIMANTARA PERDANA   TAHAP 1
       26     A     FLOOR 18   3BR    A#C18-01   Pool       56   44.97     4847      32.18.022.007.013-0461         796,971,280     91,893,000      92,000,000        10,120,000       2,300,000       4,600,000     109,020,000              687,951,280           600,000,000   PT. SILIWANGI BIMANTARA PERDANA   TAHAP 1
       27     A     FLOOR 18   3BR    A#C18-10   Pool       56   45.63     4483      32.18.022.007.013-0469         796,971,280     93,726,000      94,000,000        10,340,000       2,350,000       4,700,000     111,390,000              685,581,280           600,000,000   PT. SILIWANGI BIMANTARA PERDANA   TAHAP 1
       28     A     FLOOR 18   3BR    A#C18-11   City       56   45.81     4484      32.18.022.007.013-0470         796,971,280     93,726,000      94,000,000        10,340,000       2,350,000       4,700,000     111,390,000              685,581,280           600,000,000   PT. SILIWANGI BIMANTARA PERDANA   TAHAP 1
       29     A     FLOOR 18   3BR    A#C18-23   Golf       56   43.97     4517      32.18.022.007.013-0480         796,971,280     90,060,000      91,000,000        10,010,000       2,275,000       4,550,000     107,835,000              689,136,280           600,000,000   PT. SILIWANGI BIMANTARA PERDANA   TAHAP 1
       30     A     FLOOR 19   2BR    A#B19-06   Pool       42   30.53     2203      32.18.022.007.013-0485         597,728,460     63,879,000      64,000,000         7,040,000       1,600,000       3,200,000      75,840,000              521,888,460           450,000,000   PT. SILIWANGI BIMANTARA PERDANA   TAHAP 1
       31     A     FLOOR 19   2BR    A#B19-07   Pool       42   33.19     2204      32.18.022.007.013-0486         597,728,460     67,545,000      68,000,000         7,480,000       1,700,000       3,400,000      80,580,000              517,148,460           450,000,000   PT. SILIWANGI BIMANTARA PERDANA   TAHAP 1
       32     A     FLOOR 19   2BR    A#B19-16   City       42   33.27     2231      32.18.022.007.013-0493         597,728,460     67,545,000      68,000,000         7,480,000       1,700,000       3,400,000      80,580,000              517,148,460           450,000,000   PT. SILIWANGI BIMANTARA PERDANA   TAHAP 1
       33     A     FLOOR 19   2BR    A#B19-20   Golf       42   33.27     2235      32.18.022.007.013-0497         597,728,460     67,545,000      68,000,000         7,480,000       1,700,000       3,400,000      80,580,000              517,148,460           450,000,000   PT. SILIWANGI BIMANTARA PERDANA   TAHAP 1
       34     A     FLOOR 19   3BR    A#C19-01   Pool       56   44.97     2199      32.18.022.007.013-0481         796,971,280     91,893,000      92,000,000        10,120,000       2,300,000       4,600,000     109,020,000              687,951,280           600,000,000   PT. SILIWANGI BIMANTARA PERDANA   TAHAP 1
       35     A     FLOOR 19   3BR    A#C19-23   Golf       56   43.97     2238      32.18.022.007.013-0500         796,971,280     90,060,000      91,000,000        10,010,000       2,275,000       4,550,000     107,835,000              689,136,280           600,000,000   PT. SILIWANGI BIMANTARA PERDANA   TAHAP 1
       36     A     FLOOR 20   3BR    A#C20-01   Pool       56   44.97     2182      32.18.022.007.013-0501         796,971,280     91,893,000      92,000,000        10,120,000       2,300,000       4,600,000     109,020,000              687,951,280           600,000,000   PT. SILIWANGI BIMANTARA PERDANA   TAHAP 1
       37     A     FLOOR 20   3BR    A#C20-23   Golf       56   43.97     2244      32.18.022.007.013-0520         796,971,280     90,060,000      91,000,000        10,010,000       2,275,000       4,550,000     107,835,000              689,136,280           600,000,000   PT. SILIWANGI BIMANTARA PERDANA   TAHAP 1
       38     A     FLOOR 22   1BR    A#A22-21   Golf       25   19.87     3490      32.18.022.007.013-0558         355,790,750     48,704,000      49,000,000         5,390,000       1,225,000       2,450,000      58,065,000              297,725,750           295,000,000   PT. SILIWANGI BIMANTARA PERDANA   TAHAP 1
       39     A     FLOOR 22   2BR    A#B22-15   City       42   32.21     3484      32.18.022.007.013-0552         597,728,460     65,712,000      66,000,000         7,260,000       1,650,000       3,300,000      78,210,000              519,518,460           450,000,000   PT. SILIWANGI BIMANTARA PERDANA   TAHAP 1
       40     A     FLOOR 22   3BR    A#C22-11   City       56   45.81     3482      32.18.022.007.013-0550         796,971,280     93,726,000      94,000,000        10,340,000       2,350,000       4,700,000     111,390,000              685,581,280           600,000,000   PT. SILIWANGI BIMANTARA PERDANA   TAHAP 1
       41     A     FLOOR 23   2BR    A#B23-06   Pool       42   30.53     1843      32.18.022.007.013-0565         597,728,460     63,879,000      64,000,000         7,040,000       1,600,000       3,200,000      75,840,000              521,888,460           450,000,000   PT. SILIWANGI BIMANTARA PERDANA   TAHAP 1
       42     A     FLOOR 23   3BR    A#C23-01   Pool       56   44.97     1839      32.18.022.007.013-0561         796,971,280     91,893,000      92,000,000        10,120,000       2,300,000       4,600,000     109,020,000              687,951,280           600,000,000   PT. SILIWANGI BIMANTARA PERDANA   TAHAP 1
       43     A     FLOOR 23   3BR    A#C23-10   Pool       56   45.63     1856      32.18.022.007.013-0569         796,971,280     93,726,000      94,000,000        10,340,000       2,350,000       4,700,000     111,390,000              685,581,280           600,000,000   PT. SILIWANGI BIMANTARA PERDANA   TAHAP 1
       44     A     FLOOR 23   3BR    A#C23-11   City       56   45.81     1857      32.18.022.007.013-0570         796,971,280     93,726,000      94,000,000        10,340,000       2,350,000       4,700,000     111,390,000              685,581,280           600,000,000   PT. SILIWANGI BIMANTARA PERDANA   TAHAP 1
       45     A     FLOOR 23   3BR    A#C23-23   Golf       56   43.97     1880      32.18.022.007.013-0580         796,971,280     90,060,000      91,000,000        10,010,000       2,275,000       4,550,000     107,835,000              689,136,280           600,000,000   PT. SILIWANGI BIMANTARA PERDANA   TAHAP 1
       46     A     FLOOR 25   2BR    A#B25-15   City       42   32.21     1705      32.18.022.007.013-0592         597,728,460     65,712,000      66,000,000         7,260,000       1,650,000       3,300,000      78,210,000              519,518,460           450,000,000   PT. SILIWANGI BIMANTARA PERDANA   TAHAP 1
       47     A     FLOOR 25   2BR    A#B25-19   Golf       42   33.43     1717      32.18.022.007.013-0596         597,728,460     67,545,000      68,000,000         7,480,000       1,700,000       3,400,000      80,580,000              517,148,460           450,000,000   PT. SILIWANGI BIMANTARA PERDANA   TAHAP 1
       48     A     FLOOR 25   3BR    A#C25-11   City       56   45.81     1703      32.18.022.007.013-0590         796,971,280     93,726,000      94,000,000        10,340,000       2,350,000       4,700,000     111,390,000              685,581,280           600,000,000   PT. SILIWANGI BIMANTARA PERDANA   TAHAP 1
       49     A     FLOOR 26   1BR    A#A26-12   City       25   19.47     1545      32.18.022.007.013-0611         355,790,750     46,504,000      47,000,000         5,170,000       1,175,000       2,350,000      55,695,000              300,095,750           295,000,000   PT. SILIWANGI BIMANTARA PERDANA   TAHAP 1
       50     A     FLOOR 26   3BR    A#C26-23   Golf       56   43.97     1554      32.18.022.007.013-0620         796,971,280     90,060,000      91,000,000        10,010,000       2,275,000       4,550,000     107,835,000              689,136,280           600,000,000   PT. SILIWANGI BIMANTARA PERDANA   TAHAP 1
       51     A     FLOOR 27   3BR    A#C27-11   City       56   45.81     1415      32.18.022.007.013-0630         796,971,280     93,726,000      94,000,000        10,340,000       2,350,000       4,700,000     111,390,000              685,581,280           600,000,000   PT. SILIWANGI BIMANTARA PERDANA   TAHAP 1
       52     A     FLOOR 28   2BR    A#B28-16   City       42   33.27     1277      32.18.022.007.013-0653         597,728,460     67,545,000      68,000,000         7,480,000       1,700,000       3,400,000      80,580,000              517,148,460           450,000,000   PT. SILIWANGI BIMANTARA PERDANA   TAHAP 1
       53     A     FLOOR 28   2BR    A#B28-19   Golf       42   33.43     1280      32.18.022.007.013-0656         597,728,460     67,545,000      68,000,000         7,480,000       1,700,000       3,400,000      80,580,000              517,148,460           450,000,000   PT. SILIWANGI BIMANTARA PERDANA   TAHAP 1
       54     A     FLOOR 28   3BR    A#C28-01   Pool       56   44.97     1265      32.18.022.007.013-0641         796,971,280     91,893,000      92,000,000        10,120,000       2,300,000       4,600,000     109,020,000              687,951,280           600,000,000   PT. SILIWANGI BIMANTARA PERDANA   TAHAP 1
       55     A     FLOOR 28   3BR    A#C28-10   Pool       56   45.63     1273      32.18.022.007.013-0649         796,971,280     93,726,000      94,000,000        10,340,000       2,350,000       4,700,000     111,390,000              685,581,280           600,000,000   PT. SILIWANGI BIMANTARA PERDANA   TAHAP 1
       56     A     FLOOR 28   3BR    A#C28-11   City       56   45.81     1274      32.18.022.007.013-0650         796,971,280     93,726,000      94,000,000        10,340,000       2,350,000       4,700,000     111,390,000              685,581,280           600,000,000   PT. SILIWANGI BIMANTARA PERDANA   TAHAP 1
       57     A     FLOOR 28   3BR    A#C28-23   Golf       56   43.97     1284      32.18.022.007.013-0660         796,971,280     90,060,000      91,000,000        10,010,000       2,275,000       4,550,000     107,835,000              689,136,280           600,000,000   PT. SILIWANGI BIMANTARA PERDANA   TAHAP 1
       58     A     FLOOR 30   2BR    A#B30-15   City       42   32.21     3102      32.18.022.007.013-0692         597,728,460     65,712,000      66,000,000         7,260,000       1,650,000       3,300,000      78,210,000              519,518,460           450,000,000   PT. SILIWANGI BIMANTARA PERDANA   TAHAP 1
       59     A     FLOOR 30   3BR    A#C30-01   Pool       56   44.97     3091      32.18.022.007.013-0681         796,971,280     91,893,000      92,000,000        10,120,000       2,300,000       4,600,000     109,020,000              687,951,280           600,000,000   PT. SILIWANGI BIMANTARA PERDANA   TAHAP 1
       60     A     FLOOR 30   3BR    A#C30-10   Pool       56   45.63     3099      32.18.022.007.013-0689         796,971,280     93,726,000      94,000,000        10,340,000       2,350,000       4,700,000     111,390,000              685,581,280           600,000,000   PT. SILIWANGI BIMANTARA PERDANA   TAHAP 1
       61     A     FLOOR 30   3BR    A#C30-11   City       56   45.81     3100      32.18.022.007.013-0690         796,971,280     93,726,000      94,000,000        10,340,000       2,350,000       4,700,000     111,390,000              685,581,280           600,000,000   PT. SILIWANGI BIMANTARA PERDANA   TAHAP 1
       62     A     FLOOR 31   2BR    A#B31-06   Pool       42   30.53     1062      32.18.022.007.013-0705         597,728,460     63,879,000      64,000,000         7,040,000       1,600,000       3,200,000      75,840,000              521,888,460           450,000,000   PT. SILIWANGI BIMANTARA PERDANA   TAHAP 1
       63     A     FLOOR 31   2BR    A#B31-15   City       42   32.21     1073      32.18.022.007.013-0712         597,728,460     65,712,000      66,000,000         7,260,000       1,650,000       3,300,000      78,210,000              519,518,460           450,000,000   PT. SILIWANGI BIMANTARA PERDANA   TAHAP 1
       64     A     FLOOR 31   2BR    A#B31-16   City       42   33.27     1074      32.18.022.007.013-0713         597,728,460     67,545,000      68,000,000         7,480,000       1,700,000       3,400,000      80,580,000              517,148,460           450,000,000   PT. SILIWANGI BIMANTARA PERDANA   TAHAP 1
       65     A     FLOOR 31   3BR    A#C31-01   Pool       56   44.97     1079      32.18.022.007.013-0701         796,971,280     91,893,000      92,000,000        10,120,000       2,300,000       4,600,000     109,020,000              687,951,280           600,000,000   PT. SILIWANGI BIMANTARA PERDANA   TAHAP 1

       66    A      FLOOR 31   3BR    A#C31-10   Pool      56    45.63     1067      32.18.022.007.013-0709         796,971,280     93,726,000      94,000,000       10,340,000        2,350,000       4,700,000     111,390,000              685,581,280          600,000,000    PT. SILIWANGI BIMANTARA PERDANA   TAHAP 2
       67    A      FLOOR 31   3BR    A#C31-11   City      56    45.81     1068      32.18.022.007.013-0710         796,971,280     93,726,000      94,000,000       10,340,000        2,350,000       4,700,000     111,390,000              685,581,280          600,000,000    PT. SILIWANGI BIMANTARA PERDANA   TAHAP 2
       68    A      FLOOR 31   3BR    A#C31-23   Golf      56    43.97     4879      32.18.022.007.013-0720         796,971,280     90,060,000      91,000,000       10,010,000        2,275,000       4,550,000     107,835,000              689,136,280          600,000,000    PT. SILIWANGI BIMANTARA PERDANA   TAHAP 2
       69    A      FLOOR 32   2BR    A#B32-06   Pool      42    30.53     4563      32.18.022.007.013-0725         597,728,460     63,879,000      64,000,000        7,040,000        1,600,000       3,200,000      75,840,000              521,888,460          450,000,000    PT. SILIWANGI BIMANTARA PERDANA   TAHAP 2
       70    A      FLOOR 32   2BR    A#B32-15   City      42    32.21     4583      32.18.022.007.013-0732         597,728,460     65,712,000      66,000,000        7,260,000        1,650,000       3,300,000      78,210,000              519,518,460          450,000,000    PT. SILIWANGI BIMANTARA PERDANA   TAHAP 2
       71    A      FLOOR 32   2BR    A#B32-16   City      42    33.27     4584      32.18.022.007.013-0733         597,728,460     67,545,000      68,000,000        7,480,000        1,700,000       3,400,000      80,580,000              517,148,460          450,000,000    PT. SILIWANGI BIMANTARA PERDANA   TAHAP 2
       72    A      FLOOR 32   3BR    A#C32-01   Pool      56    44.97     4559      32.18.022.007.013-0721         796,971,280     91,893,000      92,000,000       10,120,000        2,300,000       4,600,000     109,020,000              687,951,280          600,000,000    PT. SILIWANGI BIMANTARA PERDANA   TAHAP 2
       73    A      FLOOR 32   3BR    A#C32-10   Pool      56    45.63     4567      32.18.022.007.013-0729         796,971,280     93,726,000      94,000,000       10,340,000        2,350,000       4,700,000     111,390,000              685,581,280          600,000,000    PT. SILIWANGI BIMANTARA PERDANA   TAHAP 2
       74    A      FLOOR 32   3BR    A#C32-11   City      56    45.81     4568      32.18.022.007.013-0730         796,971,280     93,726,000      94,000,000       10,340,000        2,350,000       4,700,000     111,390,000              685,581,280          600,000,000    PT. SILIWANGI BIMANTARA PERDANA   TAHAP 2
       75    A      FLOOR 33   2BR    A#B33-15   City      42    32.21     2656      32.18.022.007.013-0752         597,728,460     65,712,000      66,000,000        7,260,000        1,650,000       3,300,000      78,210,000              519,518,460          450,000,000    PT. SILIWANGI BIMANTARA PERDANA   TAHAP 2
       76    A      FLOOR 33   3BR    A#C33-01   Pool      56    44.97     2645      32.18.022.007.013-0741         796,971,280     91,893,000      92,000,000       10,120,000        2,300,000       4,600,000     109,020,000              687,951,280          600,000,000    PT. SILIWANGI BIMANTARA PERDANA   TAHAP 2
       77    A      FLOOR 33   3BR    A#C33-10   Pool      56    45.63     2653      32.18.022.007.013-0749         796,971,280     93,726,000      94,000,000       10,340,000        2,350,000       4,700,000     111,390,000              685,581,280          600,000,000    PT. SILIWANGI BIMANTARA PERDANA   TAHAP 2
       78    A      FLOOR 33   3BR    A#C33-11   City      56    45.81     2654      32.18.022.007.013-0750         796,971,280     93,726,000      94,000,000       10,340,000        2,350,000       4,700,000     111,390,000              685,581,280          600,000,000    PT. SILIWANGI BIMANTARA PERDANA   TAHAP 2
       79    A      FLOOR 35   2BR    A#B35-07   Pool      42    33.19     1776      32.18.022.007.013-0766         597,728,460     67,545,000      68,000,000        7,480,000        1,700,000       3,400,000      80,580,000              517,148,460          450,000,000    PT. SILIWANGI BIMANTARA PERDANA   TAHAP 2
       80    A      FLOOR 35   2BR    A#B35-16   City      42    33.27     1772      32.18.022.007.013-0773         597,728,460     67,545,000      68,000,000        7,480,000        1,700,000       3,400,000      80,580,000              517,148,460          450,000,000    PT. SILIWANGI BIMANTARA PERDANA   TAHAP 2
       81    A      FLOOR 35   3BR    A#C35-01   Pool      56    44.97     1765      32.18.022.007.013-0761         796,971,280     91,893,000      92,000,000       10,120,000        2,300,000       4,600,000     109,020,000              687,951,280          600,000,000    PT. SILIWANGI BIMANTARA PERDANA   TAHAP 2
       82    A      FLOOR 35   3BR    A#C35-10   Pool      56    45.63     1769      32.18.022.007.013-0769         796,971,280     93,726,000      94,000,000       10,340,000        2,350,000       4,700,000     111,390,000              685,581,280          600,000,000    PT. SILIWANGI BIMANTARA PERDANA   TAHAP 2
       83    A      FLOOR 35   3BR    A#C35-11   City      56    45.81     1768      32.18.022.007.013-0770         796,971,280     93,726,000      94,000,000       10,340,000        2,350,000       4,700,000     111,390,000              685,581,280          600,000,000    PT. SILIWANGI BIMANTARA PERDANA   TAHAP 2
       84    A      FLOOR 38   1BR    A#A38-09   Pool      25    19.72     3168      32.18.022.007.013-0828         355,790,750     48,704,000      49,000,000        5,390,000        1,225,000       2,450,000      58,065,000              297,725,750          295,000,000    PT. SILIWANGI BIMANTARA PERDANA   TAHAP 2
       85    A      FLOOR 51   1BR    A#A51-03   Pool      25    20.18     4786      32.18.022.007.013-0883         355,790,750     50,904,000      51,000,000        5,610,000        1,275,000       2,550,000      60,435,000              295,355,750          295,000,000    PT. SILIWANGI BIMANTARA PERDANA   TAHAP 2
       86    A      FLOOR 51   1BR    A#A51-05   Pool      25    18.81     4787      32.18.022.007.013-0884         355,790,750     46,504,000      47,000,000        5,170,000        1,175,000       2,350,000      55,695,000              300,095,750          295,000,000    PT. SILIWANGI BIMANTARA PERDANA   TAHAP 2
                                                                                                                                                                                                                                                                                                                    TAHAP 2
        1    A      FLOOR 36   3BR    A#C36-01   Pool      56    44.97     3176      32.18.022.007.013-0781         796,971,280     91,893,000      92,000,000       10,120,000        2,300,000       4,600,000     109,020,000              687,951,280          600,000,000    PT. SILIWANGI BIMANTARA PERDANA   TAHAP 2
        2    A      FLOOR 36   3BR    A#C36-10   Pool      56    45.63     3197      32.18.022.007.013-0789         796,971,280     93,726,000      94,000,000       10,340,000        2,350,000       4,700,000     111,390,000              685,581,280          600,000,000    PT. SILIWANGI BIMANTARA PERDANA   TAHAP 2
        3    A      FLOOR 36   3BR    A#C36-11   City      56    45.81     3198      32.18.022.007.013-0790         796,971,280     93,726,000      94,000,000       10,340,000        2,350,000       4,700,000     111,390,000              685,581,280          600,000,000    PT. SILIWANGI BIMANTARA PERDANA   TAHAP 2
        4    A      FLOOR 36   3BR    A#C36-23   Golf      56    43.97     3221      32.18.022.007.013-0800         796,971,280     90,060,000      91,000,000       10,010,000        2,275,000       4,550,000     107,835,000              689,136,280          600,000,000    PT. SILIWANGI BIMANTARA PERDANA   TAHAP 2
        5    A      FLOOR 37   2BR    A#B37-06   Pool      42    30.53     3349      32.18.022.007.013-0805         597,728,460     63,879,000      64,000,000        7,040,000        1,600,000       3,200,000      75,840,000              521,888,460          450,000,000    PT. SILIWANGI BIMANTARA PERDANA   TAHAP 2
        6    A      FLOOR 37   2BR    A#B37-07   Pool      42    33.19     3350      32.18.022.007.013-0806         597,728,460     67,545,000      68,000,000        7,480,000        1,700,000       3,400,000      80,580,000              517,148,460          450,000,000    PT. SILIWANGI BIMANTARA PERDANA   TAHAP 2
        7    A      FLOOR 37   2BR    A#B37-19   Golf      42    33.43     3360      32.18.022.007.013-0816         597,728,460     67,545,000      68,000,000        7,480,000        1,700,000       3,400,000      80,580,000              517,148,460          450,000,000    PT. SILIWANGI BIMANTARA PERDANA   TAHAP 2
        8    A      FLOOR 37   3BR    A#C37-01   Pool      56    44.97     3345      32.18.022.007.013-0801         796,971,280     91,893,000      92,000,000       10,120,000        2,300,000       4,600,000     109,020,000              687,951,280          600,000,000    PT. SILIWANGI BIMANTARA PERDANA   TAHAP 2
        9    A      FLOOR 37   3BR    A#C37-10   Pool      56    45.63     3353      32.18.022.007.013-0809         796,971,280     93,726,000      94,000,000       10,340,000        2,350,000       4,700,000     111,390,000              685,581,280          600,000,000    PT. SILIWANGI BIMANTARA PERDANA   TAHAP 2
       10    A      FLOOR 37   3BR    A#C37-11   City      56    45.81     3354      32.18.022.007.013-0810         796,971,280     93,726,000      94,000,000       10,340,000        2,350,000       4,700,000     111,390,000              685,581,280          600,000,000    PT. SILIWANGI BIMANTARA PERDANA   TAHAP 2
       11    A      FLOOR 38   2BR    A#B38-06   Pool      42    30.53     3165      32.18.022.007.013-0825         597,728,460     63,879,000      64,000,000        7,040,000        1,600,000       3,200,000      75,840,000              521,888,460          450,000,000    PT. SILIWANGI BIMANTARA PERDANA   TAHAP 2
       12    A      FLOOR 38   2BR    A#B38-07   Pool      42    33.19     3166      32.18.022.007.013-0826         597,728,460     67,545,000      68,000,000        7,480,000        1,700,000       3,400,000      80,580,000              517,148,460          450,000,000    PT. SILIWANGI BIMANTARA PERDANA   TAHAP 2
       13    A      FLOOR 38   2BR    A#B38-15   City      42    32.21     3172      32.18.022.007.013-0832         597,728,460     65,712,000      66,000,000        7,260,000        1,650,000       3,300,000      78,210,000              519,518,460          450,000,000    PT. SILIWANGI BIMANTARA PERDANA   TAHAP 2
       14    A      FLOOR 38   2BR    A#B38-16   City      42    33.27     3173      32.18.022.007.013-0833         597,728,460     67,545,000      68,000,000        7,480,000        1,700,000       3,400,000      80,580,000              517,148,460          450,000,000    PT. SILIWANGI BIMANTARA PERDANA   TAHAP 2
       15    A      FLOOR 38   2BR    A#B38-19   Golf      42    33.43     3180      32.18.022.007.013-0836         597,728,460     67,545,000      68,000,000        7,480,000        1,700,000       3,400,000      80,580,000              517,148,460          450,000,000    PT. SILIWANGI BIMANTARA PERDANA   TAHAP 2
       16    A      FLOOR 38   3BR    A#C38-01   Pool      56    44.97     3161      32.18.022.007.013-0821         796,971,280     91,893,000      92,000,000       10,120,000        2,300,000       4,600,000     109,020,000              687,951,280          600,000,000    PT. SILIWANGI BIMANTARA PERDANA   TAHAP 2
       17    A      FLOOR 38   3BR    A#C38-10   Pool      56    45.63     3169      32.18.022.007.013-0829         796,971,280     93,726,000      94,000,000       10,340,000        2,350,000       4,700,000     111,390,000              685,581,280          600,000,000    PT. SILIWANGI BIMANTARA PERDANA   TAHAP 2
       18    A      FLOOR 38   3BR    A#C38-11   City      56    45.81     3170      32.18.022.007.013-0830         796,971,280     93,726,000      94,000,000       10,340,000        2,350,000       4,700,000     111,390,000              685,581,280          600,000,000    PT. SILIWANGI BIMANTARA PERDANA   TAHAP 2
       19    A      FLOOR 39   1BR    A#A39-18   City      25    20.48     1197      32.18.022.007.013-0855         355,790,750     50,904,000      51,000,000        5,610,000        1,275,000       2,550,000      60,435,000              295,355,750          295,000,000    PT. SILIWANGI BIMANTARA PERDANA   TAHAP 2
       20    A      FLOOR 39   2BR    A#B39-16   City      42    33.27     1195      32.18.022.007.013-0853         597,728,460     67,545,000      68,000,000        7,480,000        1,700,000       3,400,000      80,580,000              517,148,460          450,000,000    PT. SILIWANGI BIMANTARA PERDANA   TAHAP 2
       21    A      FLOOR 39   3BR    A#C39-01   Pool      56    44.97     1183      32.18.022.007.013-0841         796,971,280     91,893,000      92,000,000       10,120,000        2,300,000       4,600,000     109,020,000              687,951,280          600,000,000    PT. SILIWANGI BIMANTARA PERDANA   TAHAP 2
       22    A      FLOOR 39   3BR    A#C39-10   Pool      56    45.63     1191      32.18.022.007.013-0849         796,971,280     93,726,000      94,000,000       10,340,000        2,350,000       4,700,000     111,390,000              685,581,280          600,000,000    PT. SILIWANGI BIMANTARA PERDANA   TAHAP 2
       23    A      FLOOR 39   3BR    A#C39-11   City      56    45.81     1192      32.18.022.007.013-0850         796,971,280     93,726,000      94,000,000       10,340,000        2,350,000       4,700,000     111,390,000              685,581,280          600,000,000    PT. SILIWANGI BIMANTARA PERDANA   TAHAP 2
       24    A      FLOOR 39   3BR    A#C39-23   Golf      56    43.97     1202      32.18.022.007.013-0860         796,971,280     90,060,000      91,000,000       10,010,000        2,275,000       4,550,000     107,835,000              689,136,280          600,000,000    PT. SILIWANGI BIMANTARA PERDANA   TAHAP 2
       25    A      FLOOR 50   2BR    A#B50-07   Pool      42    33.19     4909      32.18.022.007.013-0866         597,728,460     67,545,000      68,000,000        7,480,000        1,700,000       3,400,000      80,580,000              517,148,460          450,000,000    PT. SILIWANGI BIMANTARA PERDANA   TAHAP 2
       26    A      FLOOR 50   2BR    A#B50-16   City      42    33.27     4899      32.18.022.007.013-0873         597,728,460     67,545,000      68,000,000        7,480,000        1,700,000       3,400,000      80,580,000              517,148,460          450,000,000    PT. SILIWANGI BIMANTARA PERDANA   TAHAP 2
       27    A      FLOOR 50   2BR    A#B50-20   Golf      42    33.27     4906      32.18.022.007.013-0877         597,728,460     67,545,000      68,000,000        7,480,000        1,700,000       3,400,000      80,580,000              517,148,460          450,000,000    PT. SILIWANGI BIMANTARA PERDANA   TAHAP 2
       28    A      FLOOR 50   3BR    A#C50-01   Pool      56    44.97     1069      32.18.022.007.013-0861         796,971,280     91,893,000      92,000,000       10,120,000        2,300,000       4,600,000     109,020,000              687,951,280          600,000,000    PT. SILIWANGI BIMANTARA PERDANA   TAHAP 2
       29    A      FLOOR 50   3BR    A#C50-10   Pool      56    45.63     4895      32.18.022.007.013-0869         796,971,280     93,726,000      94,000,000       10,340,000        2,350,000       4,700,000     111,390,000              685,581,280          600,000,000    PT. SILIWANGI BIMANTARA PERDANA   TAHAP 2
       30    A      FLOOR 50   3BR    A#C50-11   City      56    45.81     4896      32.18.022.007.013-0870         796,971,280     93,726,000      94,000,000       10,340,000        2,350,000       4,700,000     111,390,000              685,581,280          600,000,000    PT. SILIWANGI BIMANTARA PERDANA   TAHAP 2
       31    A      FLOOR 50   3BR    A#C50-23   Golf      56    43.97     4902      32.18.022.007.013-0880         796,971,280     90,060,000      91,000,000       10,010,000        2,275,000       4,550,000     107,835,000              689,136,280          600,000,000    PT. SILIWANGI BIMANTARA PERDANA   TAHAP 2
       32    A      FLOOR 51   1BR    A#A51-08   Pool      25    19.76     4790      32.18.022.007.013-0887         355,790,750     48,704,000      49,000,000        5,390,000        1,225,000       2,450,000      58,065,000              297,725,750          295,000,000    PT. SILIWANGI BIMANTARA PERDANA   TAHAP 2
       33    A      FLOOR 51   3BR    A#C51-01   Pool      56    44.97     4784      32.18.022.007.013-0881         796,971,280     91,893,000      92,000,000       10,120,000        2,300,000       4,600,000     109,020,000              687,951,280          600,000,000    PT. SILIWANGI BIMANTARA PERDANA   TAHAP 2
       34    A      FLOOR 51   3BR    A#C51-10   Pool      56    45.63     4333      32.18.022.007.013-0889         796,971,280     93,726,000      94,000,000       10,340,000        2,350,000       4,700,000     111,390,000              685,581,280          600,000,000    PT. SILIWANGI BIMANTARA PERDANA   TAHAP 2
       35    A      FLOOR 51   3BR    A#C51-11   City      56    45.81     4334      32.18.022.007.013-0890         796,971,280     93,726,000      94,000,000       10,340,000        2,350,000       4,700,000     111,390,000              685,581,280          600,000,000    PT. SILIWANGI BIMANTARA PERDANA   TAHAP 2
       36    A      FLOOR 51   3BR    A#C51-23   Golf      56    43.97     4344      32.18.022.007.013-0900         796,971,280     90,060,000      91,000,000       10,010,000        2,275,000       4,550,000     107,835,000              689,136,280          600,000,000    PT. SILIWANGI BIMANTARA PERDANA   TAHAP 2
       37    A      FLOOR 52   1BR    A#A52-02   Pool      25    19.80     3774      32.18.022.007.013-0902         355,790,750     48,704,000      49,000,000        5,390,000        1,225,000       2,450,000      58,065,000              297,725,750          295,000,000    PT. SILIWANGI BIMANTARA PERDANA   TAHAP 2
       38    A      FLOOR 52   1BR    A#A52-22   Golf      25    20.06     3791      32.18.022.007.013-0919         355,790,750     50,904,000      51,000,000        5,610,000        1,275,000       2,550,000      60,435,000              295,355,750          295,000,000    PT. SILIWANGI BIMANTARA PERDANA   TAHAP 2
       39    A      FLOOR 52   2BR    A#B52-15   City      42    32.21     3784      32.18.022.007.013-0912         669,726,288     65,712,000      66,000,000        7,260,000        1,650,000       3,300,000      78,210,000              591,516,288          450,000,000    PT. SILIWANGI BIMANTARA PERDANA   TAHAP 2
       40    A      FLOOR 52   2BR    A#B52-16   City      42    33.27     3785      32.18.022.007.013-0913         669,726,288     67,545,000      68,000,000        7,480,000        1,700,000       3,400,000      80,580,000              589,146,288          450,000,000    PT. SILIWANGI BIMANTARA PERDANA   TAHAP 2
       41    A      FLOOR 52   2BR    A#B52-19   Golf      42    33.43     3788      32.18.022.007.013-0916         669,726,288     67,545,000      68,000,000        7,480,000        1,700,000       3,400,000      80,580,000              589,146,288          450,000,000    PT. SILIWANGI BIMANTARA PERDANA   TAHAP 2
       42    A      FLOOR 52   2BR    A#B52-20   Golf      42    33.27     3789      32.18.022.007.013-0917         597,728,460     67,545,000      68,000,000        7,480,000        1,700,000       3,400,000      80,580,000              517,148,460          450,000,000    PT. SILIWANGI BIMANTARA PERDANA   TAHAP 2
       43    A      FLOOR 52   3BR    A#C52-01   Pool      56    44.97     3773      32.18.022.007.013-0901         796,971,280     91,893,000      92,000,000       10,120,000        2,300,000       4,600,000     109,020,000              687,951,280
Page 6
      76       A      FLOOR 56   2BR        A#B56-07        Pool            42         33.19       2443          32.18.022.007.013-0966               597,728,460         67,545,000          68,000,000          7,480,000         1,700,000        3,400,000          80,580,000                517,148,460        450,000,000    PT. SILIWANGI BIMANTARA PERDANA                  TAHAP 2
      77       A      FLOOR 56   2BR        A#B56-19        Golf            42         33.43       2453          32.18.022.007.013-0976               597,728,460         67,545,000          68,000,000          7,480,000         1,700,000        3,400,000          80,580,000                517,148,460        450,000,000    PT. SILIWANGI BIMANTARA PERDANA                  TAHAP 2
      78       A      FLOOR 56   3BR        A#C56-01        Pool            56         44.97       2438          32.18.022.007.013-0961               796,971,280         91,893,000          92,000,000         10,120,000         2,300,000        4,600,000         109,020,000                687,951,280        600,000,000    PT. SILIWANGI BIMANTARA PERDANA                  TAHAP 2
      79       A      FLOOR 56   3BR        A#C56-10        Pool            56         45.63       2446          32.18.022.007.013-0969               796,971,280         93,726,000          94,000,000         10,340,000         2,350,000        4,700,000         111,390,000                685,581,280        600,000,000    PT. SILIWANGI BIMANTARA PERDANA                  TAHAP 2
      80       A      FLOOR 57   1BR        A#A57-02        Pool            25         19.80       2551          32.18.022.007.013-0982               355,790,750         48,704,000          49,000,000          5,390,000         1,225,000        2,450,000          58,065,000                297,725,750        295,000,000    PT. SILIWANGI BIMANTARA PERDANA                  TAHAP 2
      81       A      FLOOR 57   1BR        A#A57-05        Pool            25         18.81       2553          32.18.022.007.013-0984               355,790,750         46,504,000          47,000,000          5,170,000         1,175,000        2,350,000          55,695,000                300,095,750        295,000,000    PT. SILIWANGI BIMANTARA PERDANA                  TAHAP 2
      82       A      FLOOR 57   2BR        A#B57-06        Pool            42         30.53       2554          32.18.022.007.013-0985               597,728,460         63,879,000          64,000,000          7,040,000         1,600,000        3,200,000          75,840,000                521,888,460        450,000,000    PT. SILIWANGI BIMANTARA PERDANA                  TAHAP 2
      83       A      FLOOR 57   2BR        A#B57-07        Pool            42         33.19       2555          32.18.022.007.013-0986               597,728,460         67,545,000          68,000,000          7,480,000         1,700,000        3,400,000          80,580,000                517,148,460        450,000,000    PT. SILIWANGI BIMANTARA PERDANA                  TAHAP 2
      84       A      FLOOR 58   1BR        A#A58-02        Pool            25         19.80       2908          32.18.022.007.013-1002               355,790,750         48,704,000          49,000,000          5,390,000         1,225,000        2,450,000          58,065,000                297,725,750        295,000,000    PT. SILIWANGI BIMANTARA PERDANA                  TAHAP 2
      85       A      FLOOR 58   1BR        A#A58-08        Pool            25         19.76       2922          32.18.022.007.013-1007               355,790,750         48,704,000          49,000,000          5,390,000         1,225,000        2,450,000          58,065,000                297,725,750        295,000,000    PT. SILIWANGI BIMANTARA PERDANA                  TAHAP 2
      86       A      FLOOR 58   1BR        A#A58-18        City            25         20.48       2930          32.18.022.007.013-1015               355,790,750         50,904,000          51,000,000          5,610,000         1,275,000        2,550,000          60,435,000                295,355,750        295,000,000    PT. SILIWANGI BIMANTARA PERDANA                  TAHAP 2
      87       A      FLOOR 58   2BR        A#B58-06        Pool            42         30.53       2911          32.18.022.007.013-1005               597,728,460         63,879,000          64,000,000          7,040,000         1,600,000        3,200,000          75,840,000                521,888,460        450,000,000    PT. SILIWANGI BIMANTARA PERDANA                  TAHAP 2
      88       A      FLOOR 58   2BR        A#B58-15        City            42         32.21       2927          32.18.022.007.013-1012               597,728,460         65,712,000          66,000,000          7,260,000         1,650,000        3,300,000          78,210,000                519,518,460        450,000,000    PT. SILIWANGI BIMANTARA PERDANA                  TAHAP 2
      89       A      FLOOR 58   2BR        A#B58-16        City            42         33.27       2928          32.18.022.007.013-1013               597,728,460         67,545,000          68,000,000          7,480,000         1,700,000        3,400,000          80,580,000                517,148,460        450,000,000    PT. SILIWANGI BIMANTARA PERDANA                  TAHAP 2
      90                                HGB 5700                             1094   1,094.00   05700/Pasirsari                                      3,050,190,000      2,573,088,000       2,574,000,000        283,140,000        64,350,000      128,700,000       3,050,190,000                          -                       PT. SILIWANGI BIMANTARA PERDANA                  TAHAP 2
      91                                    A#A19-03                        25         20.18       2201                                               355,790,750         50,904,000          51,000,000          5,610,000         1,275,000        2,550,000          60,435,000                295,355,750        450,000,000    PT. SILIWANGI BIMANTARA PERDANA                  TAHAP 2
      92                                    A#A19-18                        25         20.48       2233                                               355,790,750         50,904,000          51,000,000          5,610,000         1,275,000        2,550,000          60,435,000                295,355,750        450,000,000    PT. SILIWANGI BIMANTARA PERDANA                  TAHAP 2
      93                                    A#A22-18                        25         20.48       3487                                               355,790,750         50,904,000          51,000,000          5,610,000         1,275,000        2,550,000          60,435,000                295,355,750        450,000,000    PT. SILIWANGI BIMANTARA PERDANA                  TAHAP 2
      94                                    A#A53-03                        25         20.18       3878                                               355,790,750         50,904,000          51,000,000          5,610,000         1,275,000        2,550,000          60,435,000                295,355,750        450,000,000    PT. SILIWANGI BIMANTARA PERDANA                  TAHAP 2
      95                                    A#A53-08                        25         19.76       3882                                               355,790,750         48,704,000          49,000,000          5,390,000         1,225,000        2,450,000          58,065,000                297,725,750        450,000,000    PT. SILIWANGI BIMANTARA PERDANA                  TAHAP 2
      96                                    A#C56-11                        56         45.81       2447                                               796,971,280         93,726,000          94,000,000         10,340,000         2,350,000        4,700,000         111,390,000                685,581,280        450,000,000    PT. SILIWANGI BIMANTARA PERDANA                  TAHAP 2
      97                                    A#C57-01                        56         44.97       2550                                               796,971,280         91,893,000          92,000,000         10,120,000         2,300,000        4,600,000         109,020,000                687,951,280        450,000,000    PT. SILIWANGI BIMANTARA PERDANA                  TAHAP 2
      98                                    A#C57-10                        56         45.63       2558                                               796,971,280         93,726,000          94,000,000         10,340,000         2,350,000        4,700,000         111,390,000                685,581,280        450,000,000    PT. SILIWANGI BIMANTARA PERDANA                  TAHAP 2
      99                                    A#C57-11                        56         45.81       2533                                               796,971,280         93,726,000          94,000,000         10,340,000         2,350,000        4,700,000         111,390,000                685,581,280        450,000,000    PT. SILIWANGI BIMANTARA PERDANA                  TAHAP 2
     100                                    A#C58-01                        56         44.97       2907                                               796,971,280         91,893,000          92,000,000         10,120,000         2,300,000        4,600,000         109,020,000                687,951,280        450,000,000    PT. SILIWANGI BIMANTARA PERDANA                  TAHAP 2
     101                                    A#C58-10                        56         45.63       2924                                               796,971,280         93,726,000          94,000,000         10,340,000         2,350,000        4,700,000         111,390,000                685,581,280        450,000,000    PT. SILIWANGI BIMANTARA PERDANA                  TAHAP 2
     102                                    A#C58-11                        56         45.81       2925                                               796,971,280         93,726,000          94,000,000         10,340,000         2,350,000        4,700,000         111,390,000                685,581,280        450,000,000    PT. SILIWANGI BIMANTARA PERDANA                  TAHAP 2
     103                                    A#C58-23                        56         43.97       2948                                               796,971,280         90,060,000          91,000,000         10,010,000         2,275,000        4,550,000         107,835,000                689,136,280        450,000,000    PT. SILIWANGI BIMANTARA PERDANA                  TAHAP 2

Grand Total                                                                9,819    8,032.29                                                     128,181,132,790      17,000,659,000      17,065,000,000      1,877,150,000      426,625,000       853,250,000     20,222,025,000             107,959,107,790      87,940,000,000
                                                     Laporan PAK ( Bu Erna/Irina)   8,032.29                                                                          17,000,659,000      17,065,000,000                         426,625,000
                                                                       DIFF              -                                                                                       -                   -                                   -

TAHAP 3 ( 2024)
   No         Tower     Floor    Type         Unit            Sqm                                                           NOP                 Harga Investasi       NJOP 2024              HJB               PPN 11%          PPh 2.5%         BPHTB 5%            Total HJB         REIMBURSE FIT OUT                                                 Keterangan
         1     C      FLOOR 08   1BR        C#A08-28           25                                                31.18.022.007.013-2004                 355,790,750         50,904,000         51,000,000           5,610,000        1,275,000         2,550,000          60,435,000                295,355,750                     PT. SILIWANGI BIMANTARA PERDANA 27.03.2024       TAHAP 3-MEI 2024
         2     C      FLOOR 16   1BR        C#A16-06           25                                                31.18.022.007.013-2129                 355,790,750         46,504,000         47,000,000           5,170,000        1,175,000         2,350,000          55,695,000                300,095,750                     PT. SILIWANGI BIMANTARA PERDANA 27.03.2024       TAHAP 3-MEI 2024
         3     C      FLOOR 18   1BR        C#A18-21           25                                                31.18.022.007.013-2190                 355,790,750         48,704,000         49,000,000           5,390,000        1,225,000         2,450,000          58,065,000                297,725,750                     PT. SILIWANGI BIMANTARA PERDANA 27.03.2024       TAHAP 3-MEI 2024
         4     C      FLOOR 50   1BR        C#A50-12           25                                                31.18.022.007.013-2663                 355,790,750         50,904,000         51,000,000           5,610,000        1,275,000         2,550,000          60,435,000                295,355,750                     PT. SILIWANGI BIMANTARA PERDANA 27.03.2024       TAHAP 3-MEI 2024
         5     C      FLOOR 52   1BR        C#A52-16           25                                                31.18.022.007.013-2713                 355,790,750         48,704,000         49,000,000           5,390,000        1,225,000         2,450,000          58,065,000                297,725,750                     PT. SILIWANGI BIMANTARA PERDANA 27.03.2024       TAHAP 3-MEI 2024
         6     C      FLOOR 12   2BR        C#B12-22           42                                                31.18.022.007.013-2095                 597,728,460         67,545,000         68,000,000           7,480,000        1,700,000         3,400,000          80,580,000                517,148,460                     PT. SILIWANGI BIMANTARA PERDANA 27.03.2024       TAHAP 3-MEI 2024
         7     D      FLOOR 06   1BR        D#A06-09           25                                                32.18.022.007.013-2852                 375,000,000         48,704,000         49,000,000           5,390,000        1,225,000         2,450,000          58,065,000                316,935,000                     PT. SILIWANGI BIMANTARA PERDANA 27.03.2024       TAHAP 3-MEI 2024
         8     D      FLOOR 18   1BR        D#A18-02           25                                                32.18.022.007.013-3086                 375,000,000         48,704,000         49,000,000           5,390,000        1,225,000         2,450,000          58,065,000                316,935,000                     PT. SILIWANGI BIMANTARA PERDANA 27.03.2024       TAHAP 3-MEI 2024
         9     D      FLOOR 19   1BR        D#A19-15           25                                                32.18.022.007.013-3120                 375,000,000         50,904,000         51,000,000           5,610,000        1,275,000         2,550,000          60,435,000                314,565,000                     PT. SILIWANGI BIMANTARA PERDANA 27.03.2024       TAHAP 3-MEI 2024
        10     D      FLOOR 19   1BR        D#A19-17           25                                                32.18.022.007.013-3122                 375,000,000         48,704,000         49,000,000           5,390,000        1,225,000         2,450,000          58,065,000                316,935,000                     PT. SILIWANGI BIMANTARA PERDANA 27.03.2024       TAHAP 3-MEI 2024
        11     D      FLOOR 25   1BR        D#A25-11           25                                                32.18.022.007.013-3238                 375,000,000         48,704,000         49,000,000           5,390,000        1,225,000         2,450,000          58,065,000                316,935,000                     PT. SILIWANGI BIMANTARA PERDANA 27.03.2024       TAHAP 3-MEI 2024
        12     D      FLOOR 26   1BR        D#A26-15           25                                                32.18.022.007.013-3264                 375,000,000         50,904,000         51,000,000           5,610,000        1,275,000         2,550,000          60,435,000                314,565,000                     PT. SILIWANGI BIMANTARA PERDANA 27.03.2024       TAHAP 3-MEI 2024
        13     D      FLOOR 26   1BR        D#A26-16           25                                                32.18.022.007.013-3265                 375,000,000         48,704,000         49,000,000           5,390,000        1,225,000         2,450,000          58,065,000                316,935,000                     PT. SILIWANGI BIMANTARA PERDANA 27.03.2024       TAHAP 3-MEI 2024
        14     D      FLOOR 36   1BR        D#A36-15           25                                                32.18.022.007.013-3480                 375,000,000         50,904,000         51,000,000           5,610,000        1,275,000         2,550,000          60,435,000                314,565,000                     PT. SILIWANGI BIMANTARA PERDANA 27.03.2024       TAHAP 3-MEI 2024
        15     D      FLOOR 50   1BR        D#A50-01           25                                                32.18.022.007.013-3565                 375,000,000         50,904,000         51,000,000           5,610,000        1,275,000         2,550,000          60,435,000                314,565,000                     PT. SILIWANGI BIMANTARA PERDANA 27.03.2024       TAHAP 3-MEI 2024
        16     D      FLOOR 58   1BR        D#A58-17           25                                                32.18.022.007.013-3746                 375,000,000         48,704,000         49,000,000           5,390,000        1,225,000         2,450,000          58,065,000                316,935,000                     PT. SILIWANGI BIMANTARA PERDANA 27.03.2024       TAHAP 3-MEI 2024
        17     D      FLOOR 21   2BR        D#B21-22           42                                                32.18.022.007.013-3175                 630,000,000         67,545,000         68,000,000           7,480,000        1,700,000         3,400,000          80,580,000                549,420,000                     PT. SILIWANGI BIMANTARA PERDANA 27.03.2024       TAHAP 3-MEI 2024
        18     D      FLOOR 19   1BR        D#A19-01           25                                                32.18.022.007.013-3109                 375,000,000         50,904,000         51,000,000           5,610,000        1,275,000         2,550,000          60,435,000                314,565,000                     PT. SILIWANGI BIMANTARA PERDANA 27.03.2024       TAHAP 3-MEI 2024
        19     D      FLOOR 30   1BR        D#A30-11           25                                                32.18.022.007.013-3358                 375,000,000         48,704,000         49,000,000           5,390,000        1,225,000         2,450,000          58,065,000                316,935,000                     PT. SILIWANGI BIMANTARA PERDANA 27.03.2024       TAHAP 3-MEI 2024
        20     D      FLOOR 30   1BR        D#A30-12           25                                                32.18.022.007.013-3359                 375,000,000         48,704,000         49,000,000           5,390,000        1,225,000         2,450,000          58,065,000                316,935,000                     PT. SILIWANGI BIMANTARA PERDANA 27.03.2024       TAHAP 3-MEI 2024
        21     D      FLOOR 31   1BR        D#A31-06           25                                                32.18.022.007.013-3377                 375,000,000         46,504,000         47,000,000           5,170,000        1,175,000         2,350,000          55,695,000                319,305,000                     PT. SILIWANGI BIMANTARA PERDANA 27.03.2024       TAHAP 3-MEI 2024
        22     D      FLOOR 31   1BR        D#A31-16           25                                                32.18.022.007.013-3385                 375,000,000         48,704,000         49,000,000           5,390,000        1,225,000         2,450,000          58,065,000                316,935,000                     PT. SILIWANGI BIMANTARA PERDANA 27.03.2024       TAHAP 3-MEI 2024
        23     D      FLOOR 35   1BR        D#A35-05           25                                                32.18.022.007.013-3448                 375,000,000         48,704,000         49,000,000           5,390,000        1,225,000         2,450,000          58,065,000                316,935,000                     PT. SILIWANGI BIMANTARA PERDANA 27.03.2024       TAHAP 3-MEI 2024
        24     D      FLOOR 36   1BR        D#A36-20           25                                                32.18.022.007.013-3485                 375,000,000         48,704,000         49,000,000           5,390,000        1,225,000         2,450,000          58,065,000                316,935,000                     PT. SILIWANGI BIMANTARA PERDANA 27.03.2024       TAHAP 3-MEI 2024
        25     D      FLOOR 39   1BR        D#A39-11           25                                                32.18.022.007.013-3550                 375,000,000         48,704,000         49,000,000           5,390,000        1,225,000         2,450,000          58,065,000                316,935,000                     PT. SILIWANGI BIMANTARA PERDANA 27.03.2024       TAHAP 3-MEI 2024
        26     D      FLOOR 53   1BR        D#A53-21           25                                                32.18.022.007.013-3654                 375,000,000         50,904,000         51,000,000           5,610,000        1,275,000         2,550,000          60,435,000                314,565,000                     PT. SILIWANGI BIMANTARA PERDANA 27.03.2024       TAHAP 3-MEI 2024
        27     D      FLOOR 19   1BR        D#A19-12           25                                                32.18.022.007.013-3119                 375,000,000         48,704,000         49,000,000           5,390,000        1,225,000         2,450,000          58,065,000                316,935,000                     PT. SILIWANGI BIMANTARA PERDANA 27.03.2024       TAHAP 3-MEI 2024
        28     D      FLOOR 29   1BR        D#A29-28           25                                                32.18.022.007.013-3348                 375,000,000         50,904,000         51,000,000           5,610,000        1,275,000         2,550,000          60,435,000                314,565,000                     PT. SILIWANGI BIMANTARA PERDANA 27.03.2024       TAHAP 3-MEI 2024
        29     D      FLOOR 30   1BR        D#A30-25           25                                                32.18.022.007.013-3369                 375,000,000         48,704,000         49,000,000           5,390,000        1,225,000         2,450,000          58,065,000                316,935,000                     PT. SILIWANGI BIMANTARA PERDANA 27.03.2024       TAHAP 3-MEI 2024
        30     D      FLOOR 16   2BR        D#B16-23           42                                                32.18.022.007.013-3056                 630,000,000         67,545,000         68,000,000           7,480,000        1,700,000         3,400,000          80,580,000                549,420,000                     PT. SILIWANGI BIMANTARA PERDANA 27.03.2024       TAHAP 3-MEI 2024


                                                                   TOTAL                                                                             11,886,682,210       1,533,043,000      1,541,000,000        169,510,000       38,525,000        77,050,000       1,826,085,000              10,060,597,210              -                                                  -


                                        SUMMARY ALL :                                                                                                                                                                                     -                 -                    -
                                        TOWER                              SQM                     NAMA PT                                    HARGA INVESTASI          NJOP               NILAI AJB          PPN 11% AJB        PPh 2.5%         BPHTB 5%           TOTAL HJB          REIMBURSE FIT OUT
                                        A                                   9,819              PT. SILIWANGI BIMANTARA PERDANA                   140,067,815,000      18,533,702,000      18,606,000,000       2,046,660,000      465,150,000       930,300,000     22,048,110,000            118,019,705,000
                                        B                                  23,443              PT. BUMI WARDANA                                  334,529,821,500      42,646,236,000      42,962,000,000       4,725,820,000    1,074,050,000     2,148,100,000     50,909,970,000            283,619,851,500
                                        C                                  10,508              PT. SINO PROPERTINDO INTERNASIONAL                 59,064,693,774      22,909,033,000      22,943,000,000       2,523,730,000      573,575,000     1,147,150,000     27,187,455,000             31,877,238,774
                                                                           43,770                                                                533,662,330,274      84,088,971,000      84,511,000,000       9,296,210,000    2,112,775,000     4,225,550,000    100,145,535,000            433,516,795,274

                                                                                           ALIRAN DANA 2023:
                                                                                                           BTN                                   450,000,000,000
                                                                           PT. SILIWANGI BIMANTARA PERDANA                                        45,960,968,287
                                                                                           PT. BUMI WARDANA                                       81,297,272,615
                                                                        PT. SINO PROPERTINDO INTERNASIONAL                                           559,599,493
                                                                              TOTAL PEMBAYARAN KE PAK 2023                                       577,817,840,395
                                                                          UANG MUKA PPN PT BUMI WARDANA                                   -            1,277,388
                                                          UANG MUKA PPN PT SILIWANGI BIMANTARA PERDANA                                    -        3,875,364,773
                                                                       TOTAL PEMBELIAN UNIT PAK sd Q2 2024                                -      533,662,330,274
                                                             Setoran sd Q2 2024 PT Siliwangi Bimantara Perdana                                    487,138,729.00
                                                                           Setoran sd Q2 2024 PT Bumi Wardana                                   4,088,851,126.00
                                                                                        LEBIH BAYAR JUNI 2024                                  44,854,857,815.00
                                                           LEBIH BAYAR PT SILIWANGI BIMANTARA PERDANA                                          41,363,735,149.00
                                                                             LEBIH BAYAR PT BUMI WARDANA                                        3,491,122,666.00
Page 7
CHADSTONE
TOWER B

     NO             UNIT      KODE     SQM     Nett          NO. SERTI              NOP           HARGA INVESTASI         NJOP           NILAI AJB         PPN 11% AJB       PPh 2.5%       BPHTB 5%        TOTAL HJB        REIMBURSE FIT OUT                KETERANGAN         KETERANGAN        TAHAP
            184   B#A27-15   B#27-15      25      20.53   1438           32.18.022.007.013-1464             355,790,750     50,904,000        51,000,000         5,610,000      1,275,000       2,550,000       60,435,000               295,355,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            190   B#A27-28   B#27-28      25      20.52   1357           32.18.022.007.013-1476             355,790,750     50,904,000        51,000,000         5,610,000      1,275,000       2,550,000       60,435,000               295,355,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            201   B#A28-11   B#28-11      25      20.04   1294           32.18.022.007.013-1486             355,790,750     48,704,000        49,000,000         5,390,000      1,225,000       2,450,000       58,065,000               297,725,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            202   B#A28-12   B#28-12      25      20.49   1295           32.18.022.007.013-1487             355,790,750     48,704,000        49,000,000         5,390,000      1,225,000       2,450,000       58,065,000               297,725,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            203   B#A28-16   B#28-16      25      20.15   1297           32.18.022.007.013-1489             355,790,750     48,704,000        49,000,000         5,390,000      1,225,000       2,450,000       58,065,000               297,725,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            204   B#A28-17   B#28-17      25      19.94   1298           32.18.022.007.013-1490             355,790,750     48,704,000        49,000,000         5,390,000      1,225,000       2,450,000       58,065,000               297,725,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            205   B#A28-20   B#28-20      25      19.76   1301           32.18.022.007.013-1493             355,790,750     48,704,000        49,000,000         5,390,000      1,225,000       2,450,000       58,065,000               297,725,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            206   B#A28-21   B#28-21      25      20.48   1302           32.18.022.007.013-1494             355,790,750     48,704,000        49,000,000         5,390,000      1,225,000       2,450,000       58,065,000               297,725,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            207   B#A28-25   B#28-25      25      19.71   1305           32.18.022.007.013-1497             355,790,750     48,704,000        49,000,000         5,390,000      1,225,000       2,450,000       58,065,000               297,725,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            208   B#A28-26   B#28-26      25      19.98   1306           32.18.022.007.013-1498             355,790,750     48,704,000        49,000,000         5,390,000      1,225,000       2,450,000       58,065,000               297,725,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            209   B#A28-27   B#28-27      25      19.30   1307           32.18.022.007.013-1499             355,790,750     46,504,000        47,000,000         5,170,000      1,175,000       2,350,000       55,695,000               300,095,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            210   B#A28-28   B#28-28      25      20.52   1308           32.18.022.007.013-1500             355,790,750     50,904,000        51,000,000         5,610,000      1,275,000       2,550,000       60,435,000               295,355,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            213   B#B28-18   B#28-18      42      32.09   1299           32.18.022.007.013-1491             597,728,460     65,714,000        66,000,000         7,260,000      1,650,000       3,300,000       78,210,000               519,518,460   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            216   B#B28-23   B#28-23      42      33.24   1304           32.18.022.007.013-1496             597,728,460     67,545,000        68,000,000         7,480,000      1,700,000       3,400,000       80,580,000               517,148,460   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            217   B#A29-01   B#29-01      25      20.54   2945           32.18.022.007.013-1501             355,790,750     50,904,000        51,000,000         5,610,000      1,275,000       2,550,000       60,435,000               295,355,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            218   B#A29-02   B#29-02      25      20.19   2946           32.18.022.007.013-1502             355,790,750     48,704,000        49,000,000         5,390,000      1,225,000       2,450,000       58,065,000               297,725,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            219   B#A29-03   B#29-03      25      20.19   2960           32.18.022.007.013-1503             355,790,750     48,704,000        49,000,000         5,390,000      1,225,000       2,450,000       58,065,000               297,725,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            220   B#A29-05   B#29-05      25      20.11   2961           32.18.022.007.013-1504             355,790,750     48,704,000        49,000,000         5,390,000      1,225,000       2,450,000       58,065,000               297,725,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            221   B#A29-06   B#29-06      25      18.85   2962           32.18.022.007.013-1505             355,790,750     46,504,000        47,000,000         5,170,000      1,175,000       2,350,000       55,695,000               300,095,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            222   B#A29-09   B#29-09      25      19.72   2965           32.18.022.007.013-1508             355,790,750     48,704,000        49,000,000         5,390,000      1,225,000       2,450,000       58,065,000               297,725,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            417   B#B38-23   B#38-23      42      33.24   3217           32.18.022.007.013-1712             597,728,460     67,545,000        68,000,000         7,480,000      1,700,000       3,400,000       80,580,000               517,148,460   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            418   B#A39-01   B#39-01      25      20.54   1203           32.18.022.007.013-1717             355,790,750     50,904,000        51,000,000         5,610,000      1,275,000       2,550,000       60,435,000               295,355,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            419   B#A39-02   B#39-02      25      20.19   1204           32.18.022.007.013-1718             355,790,750     48,704,000        49,000,000         5,390,000      1,225,000       2,450,000       58,065,000               297,725,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            420   B#A39-03   B#39-03      25      20.19   1205           32.18.022.007.013-1719             355,790,750     48,704,000        49,000,000         5,390,000      1,225,000       2,450,000       58,065,000               297,725,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            421   B#A39-05   B#39-05      25      20.11   1206           32.18.022.007.013-1720             355,790,750     48,704,000        49,000,000         5,390,000      1,225,000       2,450,000       58,065,000               297,725,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            422   B#A39-06   B#39-06      25      18.85   1207           32.18.022.007.013-1721             355,790,750     46,504,000        47,000,000         5,170,000      1,175,000       2,350,000       55,695,000               300,095,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            423   B#A39-09   B#39-09      25      19.72   1210           32.18.022.007.013-1724             355,790,750     48,704,000        49,000,000         5,390,000      1,225,000       2,450,000       58,065,000               297,725,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            424   B#A39-10   B#39-10      25      20.04   1211           32.18.022.007.013-1725             355,790,750     48,704,000        49,000,000         5,390,000      1,225,000       2,450,000       58,065,000               297,725,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            425   B#A39-11   B#39-11      25      20.04   1212           32.18.022.007.013-1726             355,790,750     48,704,000        49,000,000         5,390,000      1,225,000       2,450,000       58,065,000               297,725,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            426   B#A39-12   B#39-12      25      20.49   1213           32.18.022.007.013-1727             355,790,750     48,704,000        49,000,000         5,390,000      1,225,000       2,450,000       58,065,000               297,725,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            427   B#A39-15   B#39-15      25      20.53   1214           32.18.022.007.013-1728             355,790,750     50,904,000        51,000,000         5,610,000      1,275,000       2,550,000       60,435,000               295,355,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            428   B#A39-16   B#39-16      25      20.15   1215           32.18.022.007.013-1729             355,790,750     48,704,000        49,000,000         5,390,000      1,225,000       2,450,000       58,065,000               297,725,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            429   B#A39-17   B#39-17      25      19.94   1216           32.18.022.007.013-1730             355,790,750     48,704,000        49,000,000         5,390,000      1,225,000       2,450,000       58,065,000               297,725,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            430   B#A39-20   B#39-20      25      19.76   1219           32.18.022.007.013-1733             355,790,750     48,704,000        49,000,000         5,390,000      1,225,000       2,450,000       58,065,000               297,725,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            431   B#A39-21   B#39-21      25      20.48   1220           32.18.022.007.013-1734             355,790,750     48,704,000        49,000,000         5,390,000      1,225,000       2,450,000       58,065,000               297,725,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            432   B#A39-25   B#39-25      25      19.71   1223           32.18.022.007.013-1737             355,790,750     48,704,000        49,000,000         5,390,000      1,225,000       2,450,000       58,065,000               297,725,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            433   B#A39-26   B#39-26      25      19.98   1224           32.18.022.007.013-1738             355,790,750     48,704,000        49,000,000         5,390,000      1,225,000       2,450,000       58,065,000               297,725,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            434   B#A39-27   B#39-27      25      19.30   1225           32.18.022.007.013-1739             355,790,750     46,504,000        47,000,000         5,170,000      1,175,000       2,350,000       55,695,000               300,095,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            435   B#A39-28   B#39-28      25      20.52   1226           32.18.022.007.013-1740             355,790,750     50,904,000        51,000,000         5,610,000      1,275,000       2,550,000       60,435,000               295,355,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            436   B#B39-07   B#39-07      42      30.62   1208           32.18.022.007.013-1722             597,728,460     63,879,000        64,000,000         7,040,000      1,600,000       3,200,000       75,840,000               521,888,460   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            437   B#B39-08   B#39-08      42      33.17   1209           32.18.022.007.013-1723             597,728,460     67,545,000        68,000,000         7,480,000      1,700,000       3,400,000       80,580,000               517,148,460   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            438   B#B39-18   B#39-18      42      32.09   1217           32.18.022.007.013-1731             597,728,460     65,714,000        66,000,000         7,260,000      1,650,000       3,300,000       78,210,000               519,518,460   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            439   B#B39-19   B#39-19      42      33.16   1218           32.18.022.007.013-1732             597,728,460     67,545,000        68,000,000         7,480,000      1,700,000       3,400,000       80,580,000               517,148,460   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            440   B#B39-22   B#39-22      42      33.28   1221           32.18.022.007.013-1735             597,728,460     67,545,000        68,000,000         7,480,000      1,700,000       3,400,000       80,580,000               517,148,460   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            441   B#B39-23   B#39-23      42      33.24   1222           32.18.022.007.013-1736             597,728,460     67,545,000        68,000,000         7,480,000      1,700,000       3,400,000       80,580,000               517,148,460   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            442   B#A50-01   B#50-01      25      20.54   4886           32.18.022.007.013-1741             355,790,750     50,904,000        51,000,000         5,610,000      1,275,000       2,550,000       60,435,000               295,355,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            443   B#A50-02   B#50-02      25      20.19   4887           32.18.022.007.013-1742             355,790,750     48,704,000        49,000,000         5,390,000      1,225,000       2,450,000       58,065,000               297,725,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            444   B#A50-03   B#50-03      25      20.19   4888           32.18.022.007.013-1743             355,790,750     48,704,000        49,000,000         5,390,000      1,225,000       2,450,000       58,065,000               297,725,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            445   B#A50-05   B#50-05      25      20.11   4889           32.18.022.007.013-1744             355,790,750     48,704,000        49,000,000         5,390,000      1,225,000       2,450,000       58,065,000               297,725,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            446   B#A50-06   B#50-06      25      18.85   4890           32.18.022.007.013-1745             355,790,750     46,504,000        47,000,000         5,170,000      1,175,000       2,350,000       55,695,000               300,095,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            447   B#A50-09   B#50-09      25      19.72   4876           32.18.022.007.013-1748             355,790,750     48,704,000        49,000,000         5,390,000      1,225,000       2,450,000       58,065,000               297,725,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            448   B#A50-10   B#50-10      25      20.04   4875           32.18.022.007.013-1749             355,790,750     48,704,000        49,000,000         5,390,000      1,225,000       2,450,000       58,065,000               297,725,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            449   B#A50-11   B#50-11      25      20.04   4884           32.18.022.007.013-1750             355,790,750     48,704,000        49,000,000         5,390,000      1,225,000       2,450,000       58,065,000               297,725,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            450   B#A50-12   B#50-12      25      20.49   4885           32.18.022.007.013-1751             355,790,750     48,704,000        49,000,000         5,390,000      1,225,000       2,450,000       58,065,000               297,725,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            451   B#A50-15   B#50-15      25      20.53   4877           32.18.022.007.013-1752             355,790,750     50,904,000        51,000,000         5,610,000      1,275,000       2,550,000       60,435,000               295,355,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            452   B#A50-16   B#50-16      25      20.15   4878           32.18.022.007.013-1753             355,790,750     48,704,000        49,000,000         5,390,000      1,225,000       2,450,000       58,065,000               297,725,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            453   B#A50-17   B#50-17      25      19.94   4894           32.18.022.007.013-1754             355,790,750     48,704,000        49,000,000         5,390,000      1,225,000       2,450,000       58,065,000               297,725,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            454   B#A50-20   B#50-20      25      19.76   4835           32.18.022.007.013-1757             355,790,750     48,704,000        49,000,000         5,390,000      1,225,000       2,450,000       58,065,000               297,725,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            455   B#A50-21   B#50-21      25      20.48   4836           32.18.022.007.013-1758             355,790,750     48,704,000        49,000,000         5,390,000      1,225,000       2,450,000       58,065,000               297,725,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            456   B#A50-25   B#50-25      25      19.71   4839           32.18.022.007.013-1761             355,790,750     48,704,000        49,000,000         5,390,000      1,225,000       2,450,000       58,065,000               297,725,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            457   B#A50-26   B#50-26      25      19.98   4622           32.18.022.007.013-1762             355,790,750     48,704,000        49,000,000         5,390,000      1,225,000       2,450,000       58,065,000               297,725,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            458   B#A50-27   B#50-27      25      19.30   4623           32.18.022.007.013-1763             355,790,750     46,504,000        47,000,000         5,170,000      1,175,000       2,350,000       55,695,000               300,095,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            459   B#A50-28   B#50-28      25      20.52   4624           32.18.022.007.013-1764             355,790,750     50,904,000        51,000,000         5,610,000      1,275,000       2,550,000       60,435,000               295,355,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            460   B#B50-07   B#50-07      42      30.62   4882           32.18.022.007.013-1746             597,728,460     63,879,000        64,000,000         7,040,000      1,600,000       3,200,000       75,840,000               521,888,460   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            461   B#B50-08   B#50-08      42      33.17   4883           32.18.022.007.013-1747             597,728,460     67,545,000        68,000,000         7,480,000      1,700,000       3,400,000       80,580,000               517,148,460   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            462   B#B50-18   B#50-18      42      32.09   4892           32.18.022.007.013-1755             597,728,460     65,714,000        66,000,000         7,260,000      1,650,000       3,300,000       78,210,000               519,518,460   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            463   B#B50-19   B#50-19      42      33.16   4893           32.18.022.007.013-1756             597,728,460     67,545,000        68,000,000         7,480,000      1,700,000       3,400,000       80,580,000               517,148,460   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            464   B#B50-22   B#50-22      42      33.28   4837           32.18.022.007.013-1759             597,728,460     67,545,000        68,000,000         7,480,000      1,700,000       3,400,000       80,580,000               517,148,460   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            465   B#B50-23   B#50-23      42      33.24   4838           32.18.022.007.013-1760             597,728,460     67,545,000        68,000,000         7,480,000      1,700,000       3,400,000       80,580,000               517,148,460   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            466   B#A51-01   B#51-01      25      20.54   4371           32.18.022.007.013-1765             355,790,750     50,904,000        51,000,000         5,610,000      1,275,000       2,550,000       60,435,000               295,355,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            467   B#A51-02   B#51-02      25      20.19   4372           32.18.022.007.013-1766             355,790,750     48,704,000        49,000,000         5,390,000      1,225,000       2,450,000       58,065,000               297,725,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            468   B#A51-03   B#51-03      25      20.19   4373           32.18.022.007.013-1767             355,790,750     48,704,000        49,000,000         5,390,000      1,225,000       2,450,000       58,065,000               297,725,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            469   B#A51-05   B#51-05      25      20.11   4374           32.18.022.007.013-1768             355,790,750     48,704,000        49,000,000         5,390,000      1,225,000       2,450,000       58,065,000               297,725,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            470   B#A51-06   B#51-06      25      18.85   4375           32.18.022.007.013-1769             355,790,750     46,504,000        47,000,000         5,170,000      1,175,000       2,350,000       55,695,000               300,095,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            471   B#A51-09   B#51-09      25      19.72   4378           32.18.022.007.013-1772             355,790,750     48,704,000        49,000,000         5,390,000      1,225,000       2,450,000       58,065,000               297,725,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            472   B#A51-10   B#51-10      25      20.04   4379           32.18.022.007.013-1773             355,790,750     48,704,000        49,000,000         5,390,000      1,225,000       2,450,000       58,065,000               297,725,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            473   B#A51-11   B#51-11      25      20.04   4380           32.18.022.007.013-1774             355,790,750     48,704,000        49,000,000         5,390,000      1,225,000       2,450,000       58,065,000               297,725,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            474   B#A51-12   B#51-12      25      20.49   4381           32.18.022.007.013-1775             355,790,750     48,704,000        49,000,000         5,390,000      1,225,000       2,450,000       58,065,000               297,725,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            475   B#A51-15   B#51-15      25      20.53   4382           32.18.022.007.013-1776             355,790,750     50,904,000        51,000,000         5,610,000      1,275,000       2,550,000       60,435,000               295,355,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            476   B#A51-16   B#51-16      25      20.15   4383           32.18.022.007.013-1777             355,790,750     48,704,000        49,000,000         5,390,000      1,225,000       2,450,000       58,065,000               297,725,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            477   B#A51-17   B#51-17      25      19.94   4412           32.18.022.007.013-1778             355,790,750     48,704,000        49,000,000         5,390,000      1,225,000       2,450,000       58,065,000               297,725,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            478   B#A51-20   B#51-20      25      19.76   4452           32.18.022.007.013-1781             355,790,750     48,704,000        49,000,000         5,390,000      1,225,000       2,450,000       58,065,000               297,725,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            479   B#A51-21   B#51-21      25      20.48   4453           32.18.022.007.013-1782             355,790,750     48,704,000        49,000,000         5,390,000      1,225,000       2,450,000       58,065,000               297,725,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            480   B#A51-25   B#51-25      25      19.71   4456           32.18.022.007.013-1785             355,790,750     48,704,000        49,000,000         5,390,000      1,225,000       2,450,000       58,065,000               297,725,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            481   B#A51-26   B#51-26      25      19.98   4457           32.18.022.007.013-1786             355,790,750     48,704,000        49,000,000         5,390,000      1,225,000       2,450,000       58,065,000               297,725,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            482   B#A51-27   B#51-27      25      19.30   4458           32.18.022.007.013-1787             355,790,750     46,504,000        47,000,000         5,170,000      1,175,000       2,350,000       55,695,000               300,095,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            483   B#A51-28   B#51-28      25      20.52   4459           32.18.022.007.013-1788             355,790,750     50,904,000        51,000,000         5,610,000      1,275,000       2,550,000       60,435,000               295,355,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            484   B#B51-07   B#51-07      42      30.62   4376           32.18.022.007.013-1770             597,728,460     63,879,000        64,000,000         7,040,000      1,600,000       3,200,000       75,840,000               521,888,460   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            485   B#B51-08   B#51-08      42      33.17   4377           32.18.022.007.013-1771             597,728,460     67,545,000        68,000,000         7,480,000      1,700,000       3,400,000       80,580,000               517,148,460   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            486   B#B51-18   B#51-18      42      32.09   4450           32.18.022.007.013-1779             597,728,460     65,714,000        66,000,000         7,260,000      1,650,000       3,300,000       78,210,000               519,518,460   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            487   B#B51-19   B#51-19      42      33.16   4451           32.18.022.007.013-1780             597,728,460     67,545,000        68,000,000         7,480,000      1,700,000       3,400,000       80,580,000               517,148,460   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            488   B#B51-22   B#51-22      42      33.28   4454           32.18.022.007.013-1783             597,728,460     67,545,000        68,000,000         7,480,000      1,700,000       3,400,000       80,580,000               517,148,460   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            489   B#B51-23   B#51-23      42      33.24   4455           32.18.022.007.013-1784             597,728,460     67,545,000        68,000,000         7,480,000      1,700,000       3,400,000       80,580,000               517,148,460   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            490   B#A52-01   B#52-01      25      20.54   3793           32.18.022.007.013-1789             355,790,750     50,904,000        51,000,000         5,610,000      1,275,000       2,550,000       60,435,000               295,355,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            491   B#A52-02   B#52-02      25      20.19   3794           32.18.022.007.013-1790             355,790,750     48,704,000        49,000,000         5,390,000      1,225,000       2,450,000       58,065,000               297,725,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            492   B#A52-03   B#52-03      25      20.19   3795           32.18.022.007.013-1791             355,790,750     48,704,000        49,000,000         5,390,000      1,225,000       2,450,000       58,065,000               297,725,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            493   B#A52-05   B#52-05      25      20.11   3796           32.18.022.007.013-1792             355,790,750     48,704,000        49,000,000         5,390,000      1,225,000       2,450,000       58,065,000               297,725,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            494   B#A52-06   B#52-06      25      18.85   3797           32.18.022.007.013-1793             355,790,750     46,504,000        47,000,000         5,170,000      1,175,000       2,350,000       55,695,000               300,095,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            495   B#A52-09   B#52-09      25      19.72   3800           32.18.022.007.013-1796             355,790,750     48,704,000        49,000,000         5,390,000      1,225,000       2,450,000       58,065,000               297,725,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            496   B#A52-10   B#52-10      25      20.04   3801           32.18.022.007.013-1797             355,790,750     48,704,000        49,000,000         5,390,000      1,225,000       2,450,000       58,065,000               297,725,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            497   B#A52-11   B#52-11      25      20.04   3802           32.18.022.007.013-1798             355,790,750     48,704,000        49,000,000         5,390,000      1,225,000       2,450,000       58,065,000               297,725,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            498   B#A52-12   B#52-12      25      20.49   3803           32.18.022.007.013-1799             355,790,750     48,704,000        49,000,000         5,390,000      1,225,000       2,450,000       58,065,000               297,725,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            499   B#A52-15   B#52-15      25      20.53   3804           32.18.022.007.013-1800             355,790,750     50,904,000        51,000,000         5,610,000      1,275,000       2,550,000       60,435,000               295,355,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            500   B#A52-16   B#52-16      25      20.15   3805           32.18.022.007.013-1801             355,790,750     48,704,000        49,000,000         5,390,000      1,225,000       2,450,000       58,065,000               297,725,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            501   B#A52-17   B#52-17      25      19.94   3806           32.18.022.007.013-1802             355,790,750     48,704,000        49,000,000         5,390,000      1,225,000       2,450,000       58,065,000               297,725,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            502   B#A52-20   B#52-20      25      19.76   3809           32.18.022.007.013-1805             355,790,750     48,704,000        49,000,000         5,390,000      1,225,000       2,450,000       58,065,000               297,725,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            503   B#A52-21   B#52-21      25      20.48   3810           32.18.022.007.013-1806             355,790,750     48,704,000        49,000,000         5,390,000      1,225,000       2,450,000       58,065,000               297,725,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            504   B#A52-25   B#52-25      25      19.71   3813           32.18.022.007.013-1809             355,790,750     48,704,000        49,000,000         5,390,000      1,225,000       2,450,000       58,065,000               297,725,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            505   B#A52-26   B#52-26      25      19.98   3814           32.18.022.007.013-1810             355,790,750     48,704,000        49,000,000         5,390,000      1,225,000       2,450,000       58,065,000               297,725,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            506   B#A52-27   B#52-27      25      19.30   3815           32.18.022.007.013-1811             355,790,750     46,504,000        47,000,000         5,170,000      1,175,000       2,350,000       55,695,000               300,095,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            507   B#A52-28   B#52-28      25      20.52   3816           32.18.022.007.013-1812             355,790,750     50,904,000        51,000,000         5,610,000      1,275,000       2,550,000       60,435,000               295,355,750   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            508   B#B52-07   B#52-07      42      30.62   3798           32.18.022.007.013-1794             597,728,460     63,879,000        64,000,000         7,040,000      1,600,000       3,200,000       75,840,000               521,888,460   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            509   B#B52-08   B#52-08      42      33.17   3799           32.18.022.007.013-1795             597,728,460     67,545,000        68,000,000         7,480,000      1,700,000       3,400,000       80,580,000               517,148,460   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            510   B#B52-18   B#52-18      42      32.09   3807           32.18.022.007.013-1803             597,728,460     65,714,000        66,000,000         7,260,000      1,650,000       3,300,000       78,210,000               519,518,460   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            511   B#B52-19   B#52-19      42      33.16   3808           32.18.022.007.013-1804             597,728,460     67,545,000        68,000,000         7,480,000      1,700,000       3,400,000       80,580,000               517,148,460   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            512   B#B52-22   B#52-22      42      33.28   3811           32.18.022.007.013-1807             597,728,460     67,545,000        68,000,000         7,480,000      1,700,000       3,400,000       80,580,000               517,148,460   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            513   B#B52-23   B#52-23      42      33.24   3812           32.18.022.007.013-1808             597,728,460     67,545,000        68,000,000         7,480,000      1,700,000       3,400,000       80,580,000               517,148,460   PT. BUMI WARDANA    AKAN DIBATALKAN    TAHAP 2 - UM
            514   B#A53-01   B#53-01      25      20.54   3909           32.18.022.007.013-1813             355,790,750     50,904,000        51,000,000         5,610,000      1,275,000       2,550,000       60,435,000               295,355,750
Page 8
555   B#A55-28   B#55-28        25   20.52   2376          32.18.022.007.013-1860   355,790,750   50,904,000   51,000,000   5,610,000   1,275,000   2,550,000   60,435,000   295,355,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
556   B#B55-07   B#55-07        42   30.62   2358          32.18.022.007.013-1842   597,728,460   63,879,000   64,000,000   7,040,000   1,600,000   3,200,000   75,840,000   521,888,460   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
557   B#B55-08   B#55-08        42   33.17   2359          32.18.022.007.013-1843   597,728,460   67,545,000   68,000,000   7,480,000   1,700,000   3,400,000   80,580,000   517,148,460   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
558   B#B55-18   B#55-18        42   32.09   2367          32.18.022.007.013-1851   597,728,460   65,714,000   66,000,000   7,260,000   1,650,000   3,300,000   78,210,000   519,518,460   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
559   B#B55-19   B#55-19        42   33.16   2368          32.18.022.007.013-1852   597,728,460   67,545,000   68,000,000   7,480,000   1,700,000   3,400,000   80,580,000   517,148,460   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
560   B#B55-22   B#55-22        42   33.28   2371          32.18.022.007.013-1855   597,728,460   67,545,000   68,000,000   7,480,000   1,700,000   3,400,000   80,580,000   517,148,460   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
561   B#B55-23   B#55-23        42   33.24   2372          32.18.022.007.013-1856   597,728,460   67,545,000   68,000,000   7,480,000   1,700,000   3,400,000   80,580,000   517,148,460   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
562   B#A56-01   B#56-01        25   20.54   2458          32.18.022.007.013-1861   355,790,750   50,904,000   51,000,000   5,610,000   1,275,000   2,550,000   60,435,000   295,355,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
563   B#A56-02   B#56-02        25   20.19   2459          32.18.022.007.013-1862   355,790,750   48,704,000   49,000,000   5,390,000   1,225,000   2,450,000   58,065,000   297,725,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
564   B#A56-03   B#56-03        25   20.19   2460          32.18.022.007.013-1863   355,790,750   48,704,000   49,000,000   5,390,000   1,225,000   2,450,000   58,065,000   297,725,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
565   B#A56-05   B#56-05        25   20.11   2461          32.18.022.007.013-1864   355,790,750   48,704,000   49,000,000   5,390,000   1,225,000   2,450,000   58,065,000   297,725,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
566   B#A56-06   B#56-06        25   18.85   2469          32.18.022.007.013-1865   355,790,750   46,504,000   47,000,000   5,170,000   1,175,000   2,350,000   55,695,000   300,095,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
567   B#A56-09   B#56-09        25   19.72   2472          32.18.022.007.013-1868   355,790,750   48,704,000   49,000,000   5,390,000   1,225,000   2,450,000   58,065,000   297,725,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
568   B#A56-10   B#56-10        25   20.04   2473          32.18.022.007.013-1869   355,790,750   48,704,000   49,000,000   5,390,000   1,225,000   2,450,000   58,065,000   297,725,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
569   B#A56-11   B#56-11        25   20.04   2474          32.18.022.007.013-1870   355,790,750   48,704,000   49,000,000   5,390,000   1,225,000   2,450,000   58,065,000   297,725,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
570   B#A56-12   B#56-12        25   20.49   2475          32.18.022.007.013-1871   355,790,750   48,704,000   49,000,000   5,390,000   1,225,000   2,450,000   58,065,000   297,725,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
571   B#A56-15   B#56-15        25   20.53   2476          32.18.022.007.013-1872   355,790,750   50,904,000   51,000,000   5,610,000   1,275,000   2,550,000   60,435,000   295,355,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
572   B#A56-16   B#56-16        25   20.15   2477          32.18.022.007.013-1873   355,790,750   48,704,000   49,000,000   5,390,000   1,225,000   2,450,000   58,065,000   297,725,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
573   B#A56-17   B#56-17        25   19.94   2478          32.18.022.007.013-1874   355,790,750   48,704,000   49,000,000   5,390,000   1,225,000   2,450,000   58,065,000   297,725,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
574   B#A56-20   B#56-20        25   19.76   2481          32.18.022.007.013-1877   355,790,750   48,704,000   49,000,000   5,390,000   1,225,000   2,450,000   58,065,000   297,725,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
575   B#A56-21   B#56-21        25   20.48   2482          32.18.022.007.013-1878   355,790,750   48,704,000   49,000,000   5,390,000   1,225,000   2,450,000   58,065,000   297,725,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
576   B#A56-25   B#56-25        25   19.71   2485          32.18.022.007.013-1881   355,790,750   48,704,000   49,000,000   5,390,000   1,225,000   2,450,000   58,065,000   297,725,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
577   B#A56-26   B#56-26        25   19.98   2486          32.18.022.007.013-1882   355,790,750   48,704,000   49,000,000   5,390,000   1,225,000   2,450,000   58,065,000   297,725,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
578   B#A56-27   B#56-27        25   19.30   2487          32.18.022.007.013-1883   355,790,750   46,504,000   47,000,000   5,170,000   1,175,000   2,350,000   55,695,000   300,095,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
579   B#A56-28   B#56-28        25   20.52   2488          32.18.022.007.013-1884   355,790,750   50,904,000   51,000,000   5,610,000   1,275,000   2,550,000   60,435,000   295,355,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
580   B#B56-07   B#56-07        42   30.62   2470          32.18.022.007.013-1866   597,728,460   63,879,000   64,000,000   7,040,000   1,600,000   3,200,000   75,840,000   521,888,460   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
581   B#B56-08   B#56-08        42   33.17   2471          32.18.022.007.013-1867   597,728,460   67,545,000   68,000,000   7,480,000   1,700,000   3,400,000   80,580,000   517,148,460   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
582   B#B56-18   B#56-18        42   32.09   2479          32.18.022.007.013-1875   597,728,460   65,714,000   66,000,000   7,260,000   1,650,000   3,300,000   78,210,000   519,518,460   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
583   B#B56-19   B#56-19        42   33.16   2480          32.18.022.007.013-1876   597,728,460   67,545,000   68,000,000   7,480,000   1,700,000   3,400,000   80,580,000   517,148,460   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
584   B#B56-22   B#56-22        42   33.28   2483          32.18.022.007.013-1879   597,728,460   67,545,000   68,000,000   7,480,000   1,700,000   3,400,000   80,580,000   517,148,460   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
585   B#B56-23   B#56-23        42   33.24   2484          32.18.022.007.013-1880   597,728,460   67,545,000   68,000,000   7,480,000   1,700,000   3,400,000   80,580,000   517,148,460   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
586   B#A57-01   B#57-01        25   20.54   2544          32.18.022.007.013-1885   355,790,750   50,904,000   51,000,000   5,610,000   1,275,000   2,550,000   60,435,000   295,355,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
587   B#A57-02   B#57-02        25   20.19   2545          32.18.022.007.013-1886   355,790,750   48,704,000   49,000,000   5,390,000   1,225,000   2,450,000   58,065,000   297,725,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
588   B#A57-03   B#57-03        25   20.19   2559          32.18.022.007.013-1887   355,790,750   48,704,000   49,000,000   5,390,000   1,225,000   2,450,000   58,065,000   297,725,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
589   B#A57-05   B#57-05        25   20.11   2560          32.18.022.007.013-1888   355,790,750   48,704,000   49,000,000   5,390,000   1,225,000   2,450,000   58,065,000   297,725,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
590   B#A57-06   B#57-06        25   18.85   2561          32.18.022.007.013-1889   355,790,750   46,504,000   47,000,000   5,170,000   1,175,000   2,350,000   55,695,000   300,095,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
591   B#A57-09   B#57-09        25   19.72   2564          32.18.022.007.013-1892   355,790,750   48,704,000   49,000,000   5,390,000   1,225,000   2,450,000   58,065,000   297,725,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
592   B#A57-10   B#57-10        25   20.04   2565          32.18.022.007.013-1893   355,790,750   48,704,000   49,000,000   5,390,000   1,225,000   2,450,000   58,065,000   297,725,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
593   B#A57-11   B#57-11        25   20.04   2566          32.18.022.007.013-1894   355,790,750   48,704,000   49,000,000   5,390,000   1,225,000   2,450,000   58,065,000   297,725,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
594   B#A57-12   B#57-12        25   20.49   2567          32.18.022.007.013-1895   355,790,750   48,704,000   49,000,000   5,390,000   1,225,000   2,450,000   58,065,000   297,725,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
595   B#A57-15   B#57-15        25   20.53   2568          32.18.022.007.013-1896   355,790,750   50,904,000   51,000,000   5,610,000   1,275,000   2,550,000   60,435,000   295,355,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
596   B#A57-16   B#57-16        25   20.15   2569          32.18.022.007.013-1897   355,790,750   48,704,000   49,000,000   5,390,000   1,225,000   2,450,000   58,065,000   297,725,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
597   B#A57-17   B#57-17        25   19.94   2570          32.18.022.007.013-1898   355,790,750   48,704,000   49,000,000   5,390,000   1,225,000   2,450,000   58,065,000   297,725,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
598   B#A57-20   B#57-20        25   19.76   2571          32.18.022.007.013-1901   355,790,750   48,704,000   49,000,000   5,390,000   1,225,000   2,450,000   58,065,000   297,725,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
599   B#A57-21   B#57-21        25   20.48   2572          32.18.022.007.013-1902   355,790,750   48,704,000   49,000,000   5,390,000   1,225,000   2,450,000   58,065,000   297,725,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
600   B#A57-25   B#57-25        25   19.71   2575          32.18.022.007.013-1905   355,790,750   48,704,000   49,000,000   5,390,000   1,225,000   2,450,000   58,065,000   297,725,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
601   B#A57-26   B#57-26        25   19.98   2576          32.18.022.007.013-1906   355,790,750   48,704,000   49,000,000   5,390,000   1,225,000   2,450,000   58,065,000   297,725,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
602   B#A57-27   B#57-27        25   19.30   2577          32.18.022.007.013-1907   355,790,750   46,504,000   47,000,000   5,170,000   1,175,000   2,350,000   55,695,000   300,095,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
603   B#A57-28   B#57-28        25   20.52   2578          32.18.022.007.013-1908   355,790,750   50,904,000   51,000,000   5,610,000   1,275,000   2,550,000   60,435,000   295,355,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
604   B#B57-07   B#57-07        42   30.62   2562          32.18.022.007.013-1890   597,728,460   63,879,000   64,000,000   7,040,000   1,600,000   3,200,000   75,840,000   521,888,460   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
605   B#B57-08   B#57-08        42   33.17   2563          32.18.022.007.013-1891   597,728,460   67,545,000   68,000,000   7,480,000   1,700,000   3,400,000   80,580,000   517,148,460   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
606   B#B57-18   B#57-18        42   32.09   2594          32.18.022.007.013-1899   597,728,460   65,714,000   66,000,000   7,260,000   1,650,000   3,300,000   78,210,000   519,518,460   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
607   B#B57-19   B#57-19        42   33.16   2595          32.18.022.007.013-1900   597,728,460   67,545,000   68,000,000   7,480,000   1,700,000   3,400,000   80,580,000   517,148,460   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
608   B#B57-22   B#57-22        42   33.28   2573          32.18.022.007.013-1903   597,728,460   67,545,000   68,000,000   7,480,000   1,700,000   3,400,000   80,580,000   517,148,460   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
609   B#B57-23   B#57-23        42   33.24   2574          32.18.022.007.013-1904   597,728,460   67,545,000   68,000,000   7,480,000   1,700,000   3,400,000   80,580,000   517,148,460   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
610   B#A31-15   B#31-15        25   20.53   4846          32.18.022.007.013-1560   398,646,600   50,904,000   51,000,000   5,610,000   1,275,000   2,550,000   60,435,000   338,211,600   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
611   B#A15-02   B#15-02        25   20.19   2795          32.18.022.007.013-1190   398,646,600   48,704,000   49,000,000   5,390,000   1,225,000   2,450,000   58,065,000   340,581,600   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
 21   B#A17-16   B#17-16   25        20.15          3660                            355,790,750   48,026,000   49,000,000   5,390,000   1,225,000   2,450,000   58,065,000   297,725,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
 22   B#B06-07   B#06-07   42        30.62          4472                            597,728,460   63,879,000   64,000,000   7,040,000   1,600,000   3,200,000   75,840,000   521,888,460   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
 23   B#B06-19   B#06-19   42        33.16          4508                            597,728,460   67,545,000   68,000,000   7,480,000   1,700,000   3,400,000   80,580,000   517,148,460   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
 24   B#B06-22   B#06-22   42        33.28          4511                            597,728,460   67,545,000   68,000,000   7,480,000   1,700,000   3,400,000   80,580,000   517,148,460   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
 25   B#B06-23   B#06-23   42        33.24          4512                            597,728,460   67,545,000   68,000,000   7,480,000   1,700,000   3,400,000   80,580,000   517,148,460   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
 26   B#A07-01   B#07-01   25        20.54          4062                            355,790,750   50,904,000   51,000,000   5,610,000   1,275,000   2,550,000   60,435,000   295,355,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
 27   B#A07-03   B#07-03   25        20.19          4064                            355,790,750   48,704,000   49,000,000   5,390,000   1,225,000   2,450,000   58,065,000   297,725,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
 28   B#A07-05   B#07-05   25        20.11          4065                            355,790,750   48,704,000   49,000,000   5,390,000   1,225,000   2,450,000   58,065,000   297,725,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
 29   B#A07-06   B#07-06   25        18.85          4066                            355,790,750   46,504,000   47,000,000   5,170,000   1,175,000   2,350,000   55,695,000   300,095,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
 30   B#A07-09   B#07-09   25        19.72          4069                            355,790,750   48,704,000   49,000,000   5,390,000   1,225,000   2,450,000   58,065,000   297,725,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
 31   B#A07-10   B#07-10   25        20.04          4070                            355,790,750   48,704,000   49,000,000   5,390,000   1,225,000   2,450,000   58,065,000   297,725,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
 32   B#A07-11   B#07-11   25        20.04          4071                            355,790,750   48,704,000   49,000,000   5,390,000   1,225,000   2,450,000   58,065,000   297,725,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
 33   B#A07-12   B#07-12   25        20.49          4072                            355,790,750   48,704,000   49,000,000   5,390,000   1,225,000   2,450,000   58,065,000   297,725,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
 34   B#A07-15   B#07-15   25        20.53          4073                            355,790,750   50,904,000   51,000,000   5,610,000   1,275,000   2,550,000   60,435,000   295,355,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
 35   B#A07-16   B#07-16   25        20.15          4074                            355,790,750   48,704,000   49,000,000   5,390,000   1,225,000   2,450,000   58,065,000   297,725,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
 36   B#A07-17   B#07-17   25        19.94          4075                            355,790,750   48,704,000   49,000,000   5,390,000   1,225,000   2,450,000   58,065,000   297,725,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
 37   B#A07-20   B#07-20   25        19.76          4078                            355,790,750   48,704,000   49,000,000   5,390,000   1,225,000   2,450,000   58,065,000   297,725,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
 38   B#A07-21   B#07-21   25        20.48          4079                            355,790,750   48,704,000   49,000,000   5,390,000   1,225,000   2,450,000   58,065,000   297,725,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
 39   B#A07-25   B#07-25   25        19.71          4082                            355,790,750   48,704,000   49,000,000   5,390,000   1,225,000   2,450,000   58,065,000   297,725,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
 40   B#A07-26   B#07-26   25        19.98          4083                            355,790,750   48,704,000   49,000,000   5,390,000   1,225,000   2,450,000   58,065,000   297,725,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
 41   B#A07-27   B#07-27   25        19.30          4084                            355,790,750   46,504,000   47,000,000   5,170,000   1,175,000   2,350,000   55,695,000   300,095,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
 42   B#B07-07   B#07-07   42        30.62          4067                            597,728,460   63,879,000   64,000,000   7,040,000   1,600,000   3,200,000   75,840,000   521,888,460   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
 43   B#B07-08   B#07-08   42        33.17          4068                            597,728,460   67,545,000   68,000,000   7,480,000   1,700,000   3,400,000   80,580,000   517,148,460   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
 44   B#B07-18   B#07-18   42        32.09          4076                            597,728,460   65,714,000   66,000,000   7,260,000   1,650,000   3,300,000   78,210,000   519,518,460   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
 45   B#B07-19   B#07-19   42        33.16          4077                            597,728,460   67,545,000   68,000,000   7,480,000   1,700,000   3,400,000   80,580,000   517,148,460   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
 46   B#B07-22   B#07-22   42        33.28          4080                            597,728,460   67,545,000   68,000,000   7,480,000   1,700,000   3,400,000   80,580,000   517,148,460   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
 47   B#B07-23   B#07-23   42        33.24          4081                            597,728,460   67,545,000   68,000,000   7,480,000   1,700,000   3,400,000   80,580,000   517,148,460   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
 48   B#A08-01   B#08-01   25        20.54          3917                            355,790,750   50,904,000   51,000,000   5,610,000   1,275,000   2,550,000   60,435,000   295,355,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
 49   B#A08-03   B#08-03   25        20.19          3919                            355,790,750   48,704,000   49,000,000   5,390,000   1,225,000   2,450,000   58,065,000   297,725,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
 50   B#A08-06   B#08-06   25        18.85          3921                            355,790,750   46,504,000   47,000,000   5,170,000   1,175,000   2,350,000   55,695,000   300,095,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
 51   B#A08-09   B#08-09   25        19.72          3924                            355,790,750   48,704,000   49,000,000   5,390,000   1,225,000   2,450,000   58,065,000   297,725,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
 52   B#A08-10   B#08-10   25        20.04          3938                            355,790,750   48,704,000   49,000,000   5,390,000   1,225,000   2,450,000   58,065,000   297,725,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
 53   B#A08-11   B#08-11   25        20.04          3939                            355,790,750   48,704,000   49,000,000   5,390,000   1,225,000   2,450,000   58,065,000   297,725,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
 54   B#A08-12   B#08-12   25        20.49          3940                            355,790,750   48,704,000   49,000,000   5,390,000   1,225,000   2,450,000   58,065,000   297,725,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
 55   B#A08-15   B#08-15   25        20.53          3941                            355,790,750   50,904,000   51,000,000   5,610,000   1,275,000   2,550,000   60,435,000   295,355,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
 56   B#A08-16   B#08-16   25        20.15          3942                            355,790,750   48,704,000   49,000,000   5,390,000   1,225,000   2,450,000   58,065,000   297,725,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
 57   B#A08-17   B#08-17   25        19.94          3943                            355,790,750   48,704,000   49,000,000   5,390,000   1,225,000   2,450,000   58,065,000   297,725,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
 58   B#A08-20   B#08-20   25        19.76          3946                            355,790,750   48,704,000   49,000,000   5,390,000   1,225,000   2,450,000   58,065,000   297,725,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
 59   B#A08-21   B#08-21   25        20.48          3947                            355,790,750   48,704,000   49,000,000   5,390,000   1,225,000   2,450,000   58,065,000   297,725,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
 60   B#A08-25   B#08-25   25        19.71          3963                            355,790,750   48,704,000   49,000,000   5,390,000   1,225,000   2,450,000   58,065,000   297,725,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
 61   B#A08-26   B#08-26   25        19.98          3964                            355,790,750   48,704,000   49,000,000   5,390,000   1,225,000   2,450,000   58,065,000   297,725,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
 62   B#A08-27   B#08-27   25        19.30          3965                            355,790,750   46,504,000   47,000,000   5,170,000   1,175,000   2,350,000   55,695,000   300,095,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
 63   B#A08-28   B#08-28   25        20.52          3966                            355,790,750   50,904,000   51,000,000   5,610,000   1,275,000   2,550,000   60,435,000   295,355,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
 64   B#B08-07   B#08-07   42        30.62          3922                            597,728,460   63,879,000   64,000,000   7,040,000   1,600,000   3,200,000   75,840,000   521,888,460   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
 65   B#B08-08   B#08-08   42        33.17          3923                            597,728,460   67,545,000   68,000,000   7,480,000   1,700,000   3,400,000   80,580,000   517,148,460   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
 66   B#B08-18   B#08-18   42        32.09          3944                            597,728,460   65,714,000   66,000,000   7,260,000   1,650,000   3,300,000   78,210,000   519,518,460   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
 67   B#B08-19   B#08-19   42        33.16          3945                            597,728,460   67,545,000   68,000,000   7,480,000   1,700,000   3,400,000   80,580,000   517,148,460   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
 68   B#B08-22   B#08-22   42        33.28          3948                            597,728,460   67,545,000   68,000,000   7,480,000   1,700,000   3,400,000   80,580,000   517,148,460   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
 69   B#B08-23   B#08-23   42        33.24          3949                            597,728,460   67,545,000   68,000,000   7,480,000   1,700,000   3,400,000   80,580,000   517,148,460   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
 70   B#A09-02   B#09-02   25        20.19          1102                            355,790,750   48,704,000   49,000,000   5,390,000   1,225,000   2,450,000   58,065,000   297,725,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
 71   B#A09-03   B#09-03   25        20.19          1103                            355,790,750   48,704,000   49,000,000   5,390,000   1,225,000   2,450,000   58,065,000   297,725,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
 72   B#A09-05   B#09-05   25        20.11          1104                            355,790,750   48,704,000   49,000,000   5,390,000   1,225,000   2,450,000   58,065,000   297,725,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
 73   B#A09-06   B#09-06   25        18.85          1105                            355,790,750   46,504,000   47,000,000   5,170,000   1,175,000   2,350,000   55,695,000   300,095,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
 74   B#A09-09   B#09-09   25        19.72          1108                            355,790,750   48,704,000   49,000,000   5,390,000   1,225,000   2,450,000   58,065,000   297,725,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
 75   B#A09-10   B#09-10   25        20.04          1109                            355,790,750   48,704,000   49,000,000   5,390,000   1,225,000   2,450,000   58,065,000   297,725,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
 76   B#A09-11   B#09-11   25        20.04          1110                            355,790,750   48,704,000   49,000,000   5,390,000   1,225,000   2,450,000   58,065,000   297,725,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
 77   B#A09-12   B#09-12   25        20.49          1111                            355,790,750   48,704,000   49,000,000   5,390,000   1,225,000   2,450,000   58,065,000   297,725,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
 78   B#A09-16   B#09-16   25        20.15          1113                            355,790,750   48,704,000   49,000,000   5,390,000   1,225,000   2,450,000   58,065,000   297,725,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
 79   B#A09-17   B#09-17   25        19.94          1114                            355,790,750   48,704,000   49,000,000   5,390,000   1,225,000   2,450,000   58,065,000   297,725,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
 80   B#A09-20   B#09-20   25        19.76          1117                            355,790,750   48,704,000   49,000,000   5,390,000   1,225,000   2,450,000   58,065,000   297,725,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
 81   B#A09-21   B#09-21   25        20.48          1118                            355,790,750   48,704,000   49,000,000   5,390,000   1,225,000   2,450,000   58,065,000   297,725,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
 82   B#A09-25   B#09-25   25        19.71          1121                            355,790,750   48,704,000   49,000,000   5,390,000   1,225,000   2,450,000   58,065,000   297,725,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
 83   B#A09-26   B#09-26   25        19.98          1122                            355,790,750   48,704,000   49,000,000   5,390,000   1,225,000   2,450,000   58,065,000   297,725,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
 84   B#A09-28   B#09-28   25        20.52          1124                            355,790,750   50,904,000   51,000,000   5,610,000   1,275,000   2,550,000   60,435,000   295,355,750   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
 85   B#B09-07   B#09-07   42        30.62          1106                            597,728,460   63,879,000   64,000,000   7,040,000   1,600,000   3,200,000   75,840,000   521,888,460   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
 86   B#B09-08   B#09-08   42        33.17          1107                            597,728,460   67,545,000   68,000,000   7,480,000   1,700,000   3,400,000   80,580,000   517,148,460   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
 87   B#B09-18   B#09-18   42        32.09          1115                            597,728,460   65,714,000   66,000,000   7,260,000   1,650,000   3,300,000   78,210,000   519,518,460   PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
 88   B#B09-19   B#09-19   42        33.16          1116                            597,728,460
Page 9
              126   B#A11-27   B#11-27   25         19.30    1926      355,790,750       46,504,000       47,000,000       5,170,000      1,175,000      2,350,000       55,695,000       300,095,750    PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
              127   B#A11-28   B#11-28   25         20.52    1927      355,790,750       50,904,000       51,000,000       5,610,000      1,275,000      2,550,000       60,435,000       295,355,750    PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
              128   B#B11-07   B#11-07   42         30.62    1896      597,728,460       63,879,000       64,000,000       7,040,000      1,600,000      3,200,000       75,840,000       521,888,460    PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
              129   B#B11-08   B#11-08   42         33.17    1897      597,728,460       67,545,000       68,000,000       7,480,000      1,700,000      3,400,000       80,580,000       517,148,460    PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
              130   B#B11-18   B#11-18   42         32.09    1905      597,728,460       65,714,000       66,000,000       7,260,000      1,650,000      3,300,000       78,210,000       519,518,460    PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
              131   B#B11-19   B#11-19   42         33.16    1919      597,728,460       67,545,000       68,000,000       7,480,000      1,700,000      3,400,000       80,580,000       517,148,460    PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
              132   B#B11-22   B#11-22   42         33.28    1922      597,728,460       67,545,000       68,000,000       7,480,000      1,700,000      3,400,000       80,580,000       517,148,460    PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
              133   B#B11-23   B#11-23   42         33.24    1923      597,728,460       67,545,000       68,000,000       7,480,000      1,700,000      3,400,000       80,580,000       517,148,460    PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
              134   B#A12-03   B#12-03   25         20.19    2045      355,790,750       48,704,000       49,000,000       5,390,000      1,225,000      2,450,000       58,065,000       297,725,750    PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
              135   B#A12-05   B#12-05   25         20.11    2046      355,790,750       48,704,000       49,000,000       5,390,000      1,225,000      2,450,000       58,065,000       297,725,750    PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
              136   B#A12-09   B#12-09   25         19.72    2050      355,790,750       48,704,000       49,000,000       5,390,000      1,225,000      2,450,000       58,065,000       297,725,750    PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
              137   B#A12-10   B#12-10   25         20.04    2051      355,790,750       48,704,000       49,000,000       5,390,000      1,225,000      2,450,000       58,065,000       297,725,750    PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
              138   B#A12-11   B#12-11   25         20.04    2052      355,790,750       48,704,000       49,000,000       5,390,000      1,225,000      2,450,000       58,065,000       297,725,750    PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
              139   B#A12-17   B#12-17   25         19.94    2056      355,790,750       48,704,000       49,000,000       5,390,000      1,225,000      2,450,000       58,065,000       297,725,750    PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
              140   B#A12-20   B#12-20   25         19.76    1783      355,790,750       48,704,000       49,000,000       5,390,000      1,225,000      2,450,000       58,065,000       297,725,750    PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
              141   B#A12-21   B#12-21   25         20.48    1784      355,790,750       48,704,000       49,000,000       5,390,000      1,225,000      2,450,000       58,065,000       297,725,750    PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
              142   B#A12-25   B#12-25   25         19.71    1787      355,790,750       48,704,000       49,000,000       5,390,000      1,225,000      2,450,000       58,065,000       297,725,750    PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
              143   B#A12-26   B#12-26   25         19.98    1788      355,790,750       48,704,000       49,000,000       5,390,000      1,225,000      2,450,000       58,065,000       297,725,750    PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
              144   B#A12-27   B#12-27   25         19.30    1789      355,790,750       46,504,000       47,000,000       5,170,000      1,175,000      2,350,000       55,695,000       300,095,750    PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
              145   B#A12-28   B#12-28   25         20.52    1790      355,790,750       50,904,000       51,000,000       5,610,000      1,275,000      2,550,000       60,435,000       295,355,750    PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
              146   B#B12-07   B#12-07   42         30.62    2048      597,728,460       63,879,000       64,000,000       7,040,000      1,600,000      3,200,000       75,840,000       521,888,460    PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
              147   B#B12-08   B#12-08   42         33.17    2049      597,728,460       67,545,000       68,000,000       7,480,000      1,700,000      3,400,000       80,580,000       517,148,460    PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
              148   B#B12-18   B#12-18   42         32.09    1781      597,728,460       65,714,000       66,000,000       7,260,000      1,650,000      3,300,000       78,210,000       519,518,460    PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
              149   B#B12-19   B#12-19   42         33.16    1782      597,728,460       67,545,000       68,000,000       7,480,000      1,700,000      3,400,000       80,580,000       517,148,460    PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
              150   B#B12-22   B#12-22   42         33.28    1785      597,728,460       67,545,000       68,000,000       7,480,000      1,700,000      3,400,000       80,580,000       517,148,460    PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
              151   B#B12-23   B#12-23   42         33.24    1786      597,728,460       67,545,000       68,000,000       7,480,000      1,700,000      3,400,000       80,580,000       517,148,460    PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
              152   B#A15-01   B#15-01   25         20.54    2794      355,790,750       50,904,000       51,000,000       5,610,000      1,275,000      2,550,000       60,435,000       295,355,750    PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
              153   B#A15-03   B#15-03   25         20.19    2796      355,790,750       48,704,000       49,000,000       5,390,000      1,225,000      2,450,000       58,065,000       297,725,750    PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
              154   B#A15-06   B#15-06   25         18.85    2798      355,790,750       46,504,000       47,000,000       5,170,000      1,175,000      2,350,000       55,695,000       300,095,750    PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
              155   B#A15-09   B#15-09   25         19.72    2801      355,790,750       48,704,000       49,000,000       5,390,000      1,225,000      2,450,000       58,065,000       297,725,750    PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
              156   B#A15-10   B#15-10   25         20.04    2802      355,790,750       48,704,000       49,000,000       5,390,000      1,225,000      2,450,000       58,065,000       297,725,750    PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
              157   B#A15-11   B#15-11   25         20.04    2803      355,790,750       48,704,000       49,000,000       5,390,000      1,225,000      2,450,000       58,065,000       297,725,750    PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
              158   B#A15-12   B#15-12   25         20.49    2804      355,790,750       48,704,000       49,000,000       5,390,000      1,225,000      2,450,000       58,065,000       297,725,750    PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
              159   B#A15-17   B#15-17   25         19.94    2807      355,790,750       48,704,000       49,000,000       5,390,000      1,225,000      2,450,000       58,065,000       297,725,750    PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
              160   B#A15-20   B#15-20   25         19.76    2810      355,790,750       48,704,000       49,000,000       5,390,000      1,225,000      2,450,000       58,065,000       297,725,750    PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
              161   B#A15-21   B#15-21   25         20.48    2811      355,790,750       48,704,000       49,000,000       5,390,000      1,225,000      2,450,000       58,065,000       297,725,750    PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
              162   B#A15-25   B#15-25   25         19.71    2814      355,790,750       48,704,000       49,000,000       5,390,000      1,225,000      2,450,000       58,065,000       297,725,750    PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
              163   B#A15-26   B#15-26   25         19.98    2815      355,790,750       48,704,000       49,000,000       5,390,000      1,225,000      2,450,000       58,065,000       297,725,750    PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
              164   B#A15-27   B#15-27   25         19.30    2816      355,790,750       46,504,000       47,000,000       5,170,000      1,175,000      2,350,000       55,695,000       300,095,750    PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
              165   B#A15-28   B#15-28   25         20.52    2817      355,790,750       50,904,000       51,000,000       5,610,000      1,275,000      2,550,000       60,435,000       295,355,750    PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
              166   B#B15-18   B#15-18   42         32.09    2808      597,728,460       65,714,000       66,000,000       7,260,000      1,650,000      3,300,000       78,210,000       519,518,460    PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
              167   B#B15-19   B#15-19   42         33.16    2809      597,728,460       67,545,000       68,000,000       7,480,000      1,700,000      3,400,000       80,580,000       517,148,460    PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
              168   B#B15-22   B#15-22   42         33.28    2812      597,728,460       67,545,000       68,000,000       7,480,000      1,700,000      3,400,000       80,580,000       517,148,460    PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
              169   B#B15-23   B#15-23   42         33.24    2813      597,728,460       67,545,000       68,000,000       7,480,000      1,700,000      3,400,000       80,580,000       517,148,460    PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
              170   B#A16-01   B#16-01   25         20.54    3556      355,790,750       50,904,000       51,000,000       5,610,000      1,275,000      2,550,000       60,435,000       295,355,750    PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
              171   B#A16-05   B#16-05   25         20.11    3559      355,790,750       48,704,000       49,000,000       5,390,000      1,225,000      2,450,000       58,065,000       297,725,750    PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
              172   B#A16-09   B#16-09   25         19.72    3563      355,790,750       48,704,000       49,000,000       5,390,000      1,225,000      2,450,000       58,065,000       297,725,750    PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
              173   B#A16-10   B#16-10   25         20.04    3564      355,790,750       48,704,000       49,000,000       5,390,000      1,225,000      2,450,000       58,065,000       297,725,750    PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
              174   B#A16-11   B#16-11   25         20.04    3565      355,790,750       48,704,000       49,000,000       5,390,000      1,225,000      2,450,000       58,065,000       297,725,750    PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
              175   B#A16-12   B#16-12   25         20.49    3566      355,790,750       48,704,000       49,000,000       5,390,000      1,225,000      2,450,000       58,065,000       297,725,750    PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
              176   B#A16-15   B#16-15   25         20.53    3567      355,790,750       50,904,000       51,000,000       5,610,000      1,275,000      2,550,000       60,435,000       295,355,750    PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
              177   B#A16-16   B#16-16   25         20.15    3568      355,790,750       48,704,000       49,000,000       5,390,000      1,225,000      2,450,000       58,065,000       297,725,750    PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
              178   B#A16-17   B#16-17   25         19.94    3569      355,790,750       48,704,000       49,000,000       5,390,000      1,225,000      2,450,000       58,065,000       297,725,750    PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
              179   B#A17-27   B#17-27    25        19.30    3670      355,790,750       45,826,000       46,000,000       5,060,000      1,150,000      2,300,000       54,510,000       301,280,750    PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
              180   B#A17-15   B#17-15   25         20.53    3659      355,790,750       50,226,000       51,000,000       5,610,000      1,275,000      2,550,000       60,435,000       295,355,750    PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
              181   B#A18-27   B#18-27   25         19.30    4580      355,790,750       46,504,000       47,000,000       5,170,000      1,175,000      2,350,000       55,695,000       300,095,750    PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
              182   B#A26-10   B#26-10   25         20.04    1563      355,790,750       48,704,000       49,000,000       5,390,000      1,225,000      2,450,000       58,065,000       297,725,750    PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
              183   B#A09-01   B#09-01   25         20.54    1101      355,790,750       50,904,000       51,000,000       5,610,000      1,275,000      2,550,000       60,435,000       295,355,750    PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
              184   B#A19-17   B#19-17   25         19.94    2265      355,790,750       48,704,000       49,000,000       5,390,000      1,225,000      2,450,000       58,065,000       297,725,750    PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
              185   B#A27-12   B#27-12   25         20.49    1437      355,790,750       48,704,000       49,000,000       5,390,000      1,225,000      2,450,000       58,065,000       297,725,750    PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
              186   B#A21-15   B#21-15   25         20.53    2135      355,790,750       50,904,000       51,000,000       5,610,000      1,275,000      2,550,000       60,435,000       295,355,750    PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
              187   B#A17-17   B#17-17   25         19.94    3661      355,790,750       48,026,000       49,000,000       5,390,000      1,225,000      2,450,000       58,065,000       297,725,750    PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM
              188   B#A17-26   B#17-26   25         19.98    3669      355,790,750       48,026,000       49,000,000       5,390,000      1,225,000      2,450,000       58,065,000       297,725,750    PT. BUMI WARDANA   AKAN DIBATALKAN   TAHAP 2 - UM

Grand Total                              11,190   8,868.03          159,337,651,400   20,393,251,000   20,513,000,000   2,256,430,000   512,825,000   1,025,650,000   24,307,905,000   135,029,746,400
Page 10
CHADSTONE
TOWER C

                                                                                                                                                                                                                                                                  REIMBURSE FIT
   NO         Tower       Floor   Type     UNIT       View   Unit    KODE      SQM        Nett        NO. SERTI                  NOP          HARGA INVESTASI        NJOP          NILAI AJB       PPN 11% AJB     PPh 2.5%       BPHTB 5%        TOTAL HJB                         Harga Investasi   Nilai Roya       Nilai Roya New                 KETERANGAN
                                                                                                                                                                                                                                                                      OUT
         1     C      FLOOR 17    2BR    C#B17-23   City      1      C#17-23       42    32.78     3691              31.18.022.007.013-2168        597,728,460       67,545,000       68,000,000       7,480,000     1,700,000      3,400,000        80,580,000      517,148,460        597,728,460     291,728,460        450,000,000   PT. SINO PROPERTINDO INTERNASIONAL
         2     C      FLOOR 27    2BR    C#B27-22   City      1      C#27-22       42    32.94     1376              31.18.022.007.013-2383        597,728,460       67,545,000       68,000,000       7,480,000     1,700,000      3,400,000        80,580,000      517,148,460        597,728,460     291,728,460        450,000,000   PT. SINO PROPERTINDO INTERNASIONAL
         3     C      FLOOR 28    2BR    C#B28-22   City      1      C#28-22       42    32.94     1327              31.18.022.007.013-2407        669,726,288       67,545,000       68,000,000       7,480,000     1,700,000      3,400,000        80,580,000      589,146,288        597,728,460     291,728,460        450,000,000   PT. SINO PROPERTINDO INTERNASIONAL
         4     C      FLOOR 33    2BR    C#B33-07   Pool      1      C#33-07       42    30.47     2694              31.18.022.007.013-2514        597,728,460       62,046,000       63,000,000       6,930,000     1,575,000      3,150,000        74,655,000      523,073,460        597,728,460     291,728,460        450,000,000   PT. SINO PROPERTINDO INTERNASIONAL
         5     C      FLOOR 35    2BR    C#B35-22   City      1      C#35-22       42    32.94     1752              31.18.022.007.013-2551        597,728,460       67,545,000       68,000,000       7,480,000     1,700,000      3,400,000        80,580,000      517,148,460        597,728,460     291,728,460        450,000,000   PT. SINO PROPERTINDO INTERNASIONAL
         6     C      FLOOR 36    2BR    C#B36-22   City      1      C#36-22       42    32.94     3303              31.18.022.007.013-2575        597,728,460       67,545,000       68,000,000       7,480,000     1,700,000      3,400,000        80,580,000      517,148,460        597,728,460     291,728,460        450,000,000   PT. SINO PROPERTINDO INTERNASIONAL
         7     C      FLOOR 36    2BR    C#B36-23   City      1      C#36-23       42    32.78     3304              31.18.022.007.013-2576        597,728,460       67,545,000       68,000,000       7,480,000     1,700,000      3,400,000        80,580,000      517,148,460        597,728,460     291,728,460        450,000,000   PT. SINO PROPERTINDO INTERNASIONAL
         8     C      FLOOR 37    2BR    C#B37-22   City      1      C#37-22       42    32.94     3131              31.18.022.007.013-2599        597,728,460       67,545,000       68,000,000       7,480,000     1,700,000      3,400,000        80,580,000      517,148,460        597,728,460     291,728,460        450,000,000   PT. SINO PROPERTINDO INTERNASIONAL
         9     C      FLOOR 37    2BR    C#B37-23   City      1      C#37-23       42    32.78     3132              31.18.022.007.013-2600        597,728,460       67,545,000       68,000,000       7,480,000     1,700,000      3,400,000        80,580,000      517,148,460        597,728,460     291,728,460        450,000,000   PT. SINO PROPERTINDO INTERNASIONAL
        10     C      FLOOR 38    2BR    C#B38-07   Pool      1      C#38-07       42    30.47     3240              31.18.022.007.013-2610        597,728,460       62,046,000       63,000,000       6,930,000     1,575,000      3,150,000        74,655,000      523,073,460        597,728,460     291,728,460        450,000,000   PT. SINO PROPERTINDO INTERNASIONAL
        11     C      FLOOR 38    2BR    C#B38-22   City      1      C#38-22       42    32.94     3266              31.18.022.007.013-2623        597,728,460       67,545,000       68,000,000       7,480,000     1,700,000      3,400,000        80,580,000      517,148,460        597,728,460     291,728,460        450,000,000   PT. SINO PROPERTINDO INTERNASIONAL
        12     C      FLOOR 50    2BR    C#B50-22   City      1      C#50-22       42    32.94     4705              31.18.022.007.013-2671        597,728,460       67,545,000       68,000,000       7,480,000     1,700,000      3,400,000        80,580,000      517,148,460        597,728,460     291,728,460        450,000,000   PT. SINO PROPERTINDO INTERNASIONAL
        13     C      FLOOR 50    2BR    C#B50-23   City      1      C#50-23       42    32.78     4706              31.18.022.007.013-2672        597,728,460       67,545,000       68,000,000       7,480,000     1,700,000      3,400,000        80,580,000      517,148,460        597,728,460     291,728,460        450,000,000   PT. SINO PROPERTINDO INTERNASIONAL
        14     C      FLOOR 51    2BR    C#B51-22   City      1      C#51-22       42    32.94     4415              31.18.022.007.013-2695        597,728,460       67,545,000       68,000,000       7,480,000     1,700,000      3,400,000        80,580,000      517,148,460        597,728,460     291,728,460        450,000,000   PT. SINO PROPERTINDO INTERNASIONAL
        15     C      FLOOR 51    2BR    C#B51-23   City      1      C#51-23       42    32.78     4416              31.18.022.007.013-2696        597,728,460       67,545,000       68,000,000       7,480,000     1,700,000      3,400,000        80,580,000      517,148,460        597,728,460     291,728,460        450,000,000   PT. SINO PROPERTINDO INTERNASIONAL
        16     C      FLOOR 52    2BR    C#B52-22   City      1      C#52-22       42    32.94     3835              31.18.022.007.013-2719        597,728,460       67,545,000       68,000,000       7,480,000     1,700,000      3,400,000        80,580,000      517,148,460        597,728,460     291,728,460        450,000,000   PT. SINO PROPERTINDO INTERNASIONAL
        17     C      FLOOR 52    2BR    C#B52-23   City      1      C#52-23       42    32.78     3836              31.18.022.007.013-2720        597,728,460       67,545,000       68,000,000       7,480,000     1,700,000      3,400,000        80,580,000      517,148,460        597,728,460     291,728,460        450,000,000   PT. SINO PROPERTINDO INTERNASIONAL
        18     C      FLOOR 53    2BR    C#B53-07   Pool      1      C#53-07       42    30.47     3974              31.18.022.007.013-2730        597,728,460       62,046,000       63,000,000       6,930,000     1,575,000      3,150,000        74,655,000      523,073,460        597,728,460     291,728,460        450,000,000   PT. SINO PROPERTINDO INTERNASIONAL
        19     C      FLOOR 53    2BR    C#B53-08   Pool      1      C#53-08       42    33.14     3975              31.18.022.007.013-2731        597,728,460       67,545,000       68,000,000       7,480,000     1,700,000      3,400,000        80,580,000      517,148,460        597,728,460     291,728,460        450,000,000   PT. SINO PROPERTINDO INTERNASIONAL
        20     C      FLOOR 53    2BR    C#B53-22   City      1      C#53-22       42    32.94     3707              31.18.022.007.013-2743        597,728,460       67,545,000       68,000,000       7,480,000     1,700,000      3,400,000        80,580,000      517,148,460        597,728,460     291,728,460        450,000,000   PT. SINO PROPERTINDO INTERNASIONAL
        21     C      FLOOR 53    2BR    C#B53-23   City      1      C#53-23       42    32.78     3708              31.18.022.007.013-2744        597,728,460       67,545,000       68,000,000       7,480,000     1,700,000      3,400,000        80,580,000      517,148,460        597,728,460     291,728,460        450,000,000   PT. SINO PROPERTINDO INTERNASIONAL
        22     C      FLOOR 55    2BR    C#B55-07   Pool      1      C#55-07       42    30.47     2382              31.18.022.007.013-2754        597,728,460       62,046,000       63,000,000       6,930,000     1,575,000      3,150,000        74,655,000      523,073,460        597,728,460     291,728,460        450,000,000   PT. SINO PROPERTINDO INTERNASIONAL
        23     C      FLOOR 55    2BR    C#B55-08   Pool      1      C#55-08       42    33.14     2383              31.18.022.007.013-2755        597,728,460       67,545,000       68,000,000       7,480,000     1,700,000      3,400,000        80,580,000      517,148,460        597,728,460     291,728,460        450,000,000   PT. SINO PROPERTINDO INTERNASIONAL
        24     C      FLOOR 55    2BR    C#B55-22   City      1      C#55-22       42    32.94     2395              31.18.022.007.013-2767        597,728,460       67,545,000       68,000,000       7,480,000     1,700,000      3,400,000        80,580,000      517,148,460        597,728,460     291,728,460        450,000,000   PT. SINO PROPERTINDO INTERNASIONAL
        25     C      FLOOR 55    2BR    C#B55-23   City      1      C#55-23       42    32.78     2396              31.18.022.007.013-2768        597,728,460       67,545,000       68,000,000       7,480,000     1,700,000      3,400,000        80,580,000      517,148,460        597,728,460     291,728,460        450,000,000   PT. SINO PROPERTINDO INTERNASIONAL
        26     C      FLOOR 56    2BR    C#B56-07   Pool      1      C#56-07       42    30.47     2494              31.18.022.007.013-2778        597,728,460       62,046,000       63,000,000       6,930,000     1,575,000      3,150,000        74,655,000      523,073,460        597,728,460     291,728,460        450,000,000   PT. SINO PROPERTINDO INTERNASIONAL
        27     C      FLOOR 56    2BR    C#B56-08   Pool      1      C#56-08       42    33.14     2495              31.18.022.007.013-2779        597,728,460       67,545,000       68,000,000       7,480,000     1,700,000      3,400,000        80,580,000      517,148,460        597,728,460     291,728,460        450,000,000   PT. SINO PROPERTINDO INTERNASIONAL
        28     C      FLOOR 56    2BR    C#B56-23   City      1      C#56-23       42    32.78     2520              31.18.022.007.013-2792        597,728,460       67,545,000       68,000,000       7,480,000     1,700,000      3,400,000        80,580,000      517,148,460        597,728,460     291,728,460        450,000,000   PT. SINO PROPERTINDO INTERNASIONAL
        29     C      FLOOR 57    2BR    C#B57-07   Pool      1      C#57-07       42    30.47     2581              31.18.022.007.013-2802        597,728,460       62,046,000       63,000,000       6,930,000     1,575,000      3,150,000        74,655,000      523,073,460        597,728,460     291,728,460        450,000,000   PT. SINO PROPERTINDO INTERNASIONAL
        30     C      FLOOR 57    2BR    C#B57-08   Pool      1      C#57-08       42    33.14     2582              31.18.022.007.013-2803        597,728,460       67,545,000       68,000,000       7,480,000     1,700,000      3,400,000        80,580,000      517,148,460        597,728,460     291,728,460        450,000,000   PT. SINO PROPERTINDO INTERNASIONAL
        31     C      FLOOR 57    2BR    C#B57-22   City      1      C#57-22       42    32.94     2596              31.18.022.007.013-2815        597,728,460       67,545,000       68,000,000       7,480,000     1,700,000      3,400,000        80,580,000      517,148,460        597,728,460     291,728,460        450,000,000   PT. SINO PROPERTINDO INTERNASIONAL
        32     C      FLOOR 57    2BR    C#B57-23   City      1      C#57-23       42    32.78     2597              31.18.022.007.013-2816        597,728,460       67,545,000       68,000,000       7,480,000     1,700,000      3,400,000        80,580,000      517,148,460        597,728,460     291,728,460        450,000,000   PT. SINO PROPERTINDO INTERNASIONAL
        33     C      FLOOR 58    2BR    C#B58-08   Pool      1      C#58-08       42    33.14     3005              31.18.022.007.013-2827        597,728,460       67,545,000       68,000,000       7,480,000     1,700,000      3,400,000        80,580,000      517,148,460        597,728,460     291,728,460        450,000,000   PT. SINO PROPERTINDO INTERNASIONAL
        34     C      FLOOR 58    2BR    C#B58-23   City      1      C#58-23       42    32.78     3031              31.18.022.007.013-2840        597,728,460       67,545,000       68,000,000       7,480,000     1,700,000      3,400,000        80,580,000      517,148,460        597,728,460     291,728,460        450,000,000   PT. SINO PROPERTINDO INTERNASIONAL
        35     C      FLOOR 50    2BR    C#B50-19   City      1      C#50-19       42    33.14     4665              31.18.022.007.013-2668        597,728,460       67,545,000       68,000,000       7,480,000     1,700,000      3,400,000        80,580,000      517,148,460        597,728,460     291,728,460        450,000,000   PT. SINO PROPERTINDO INTERNASIONAL
        36     C      FLOOR 53    2BR    C#B53-18   City      1      C#53-18       42    32.07     3983              31.18.022.007.013-2739        597,728,460       65,712,000       66,000,000       7,260,000     1,650,000      3,300,000        78,210,000      519,518,460        597,728,460     291,728,460        450,000,000   PT. SINO PROPERTINDO INTERNASIONAL
        37     C      FLOOR 53    2BR    C#B53-19   City      1      C#53-19       42    33.14     3984              31.18.022.007.013-2740        597,728,460       67,545,000       68,000,000       7,480,000     1,700,000      3,400,000        80,580,000      517,148,460        597,728,460     291,728,460        450,000,000   PT. SINO PROPERTINDO INTERNASIONAL
        38     C      FLOOR 58    2BR    C#B58-19   City      1      C#58-19       42    33.14     3027              31.18.022.007.013-2836        597,728,460       67,545,000       68,000,000       7,480,000     1,700,000      3,400,000        80,580,000      517,148,460        597,728,460     291,728,460        450,000,000   PT. SINO PROPERTINDO INTERNASIONAL
        39     C      FLOOR 16    2BR    C#B16-22   City      1      C#16-22       42    32.94     3598              31.18.022.007.013-2143        597,728,460       67,545,000       68,000,000       7,480,000     1,700,000      3,400,000        80,580,000      517,148,460        597,728,460     291,728,460        450,000,000   PT. SINO PROPERTINDO INTERNASIONAL
        40     C      FLOOR 33    2BR    C#B33-22   City      1      C#33-22       42    32.94     2707              31.18.022.007.013-2527        597,728,460       67,545,000       68,000,000       7,480,000     1,700,000      3,400,000        80,580,000      517,148,460        597,728,460     291,728,460        450,000,000   PT. SINO PROPERTINDO INTERNASIONAL
        41     C      FLOOR 33    2BR    C#B33-23   City      1      C#33-23       42    32.78     2708              31.18.022.007.013-2528        597,728,460       67,545,000       68,000,000       7,480,000     1,700,000      3,400,000        80,580,000      517,148,460        597,728,460     291,728,460        450,000,000   PT. SINO PROPERTINDO INTERNASIONAL
        42     C      FLOOR 51    2BR    C#B51-18   City      1      C#51-18       42    32.07     4395              31.18.022.007.013-2691        669,726,288       65,712,000       66,000,000       7,260,000     1,650,000      3,300,000        78,210,000      591,516,288        597,728,460     291,728,460        450,000,000   PT. SINO PROPERTINDO INTERNASIONAL
        43     C      FLOOR 31    2BR    C#B31-23   City      1      C#31-23       42    32.78     4503              31.18.022.007.013-2480        669,726,288       67,545,000       68,000,000       7,480,000     1,700,000      3,400,000        80,580,000      589,146,288        597,728,460     291,728,460        450,000,000   PT. SINO PROPERTINDO INTERNASIONAL
        44     C      FLOOR 53    1BR    C#A53-01   Pool      1      C#53-01       25    20.53     3958              31.18.022.007.013-2725        355,790,750       50,904,000       51,000,000       5,610,000     1,275,000      2,550,000        60,435,000      295,355,750        355,790,750     173,790,750        295,000,000   PT. SINO PROPERTINDO INTERNASIONAL
        45     C      FLOOR 53    1BR    C#A53-02   Pool      1      C#53-02       25    20.19     3959              31.18.022.007.013-2726        355,790,750       48,704,000       49,000,000       5,390,000     1,225,000      2,450,000        58,065,000      297,725,750        355,790,750     173,790,750        295,000,000   PT. SINO PROPERTINDO INTERNASIONAL
        46     C      FLOOR 53    1BR    C#A53-03   Pool      1      C#53-03       25    20.19     3960              31.18.022.007.013-2727        355,790,750       48,704,000       49,000,000       5,390,000     1,225,000      2,450,000        58,065,000      297,725,750        355,790,750     173,790,750        295,000,000   PT. SINO PROPERTINDO INTERNASIONAL
        47     C      FLOOR 53    1BR    C#A53-05   Pool      1      C#53-05       25    20.11     3961              31.18.022.007.013-2728        355,790,750       48,704,000       49,000,000       5,390,000     1,225,000      2,450,000        58,065,000      297,725,750        355,790,750     173,790,750        295,000,000   PT. SINO PROPERTINDO INTERNASIONAL
        48     C      FLOOR 53    1BR    C#A53-06   Pool      1      C#53-06       25    18.71     3962              31.18.022.007.013-2729        355,790,750       46,504,000       47,000,000       5,170,000     1,175,000      2,350,000        55,695,000      300,095,750        355,790,750     173,790,750        295,000,000   PT. SINO PROPERTINDO INTERNASIONAL
        49     C      FLOOR 53    1BR    C#A53-10   Pool      1      C#53-10       25    20.01     3977              31.18.022.007.013-2733        355,790,750       48,704,000       49,000,000       5,390,000     1,225,000      2,450,000        58,065,000      297,725,750        355,790,750     173,790,750        295,000,000   PT. SINO PROPERTINDO INTERNASIONAL
        50     C      FLOOR 53    1BR    C#A53-11   Pool      1      C#53-11       25    20.15     3978              31.18.022.007.013-2734        355,790,750       48,704,000       49,000,000       5,390,000     1,225,000      2,450,000        58,065,000      297,725,750        355,790,750     173,790,750        295,000,000   PT. SINO PROPERTINDO INTERNASIONAL
        51     C      FLOOR 53    1BR    C#A53-12   Pool      1      C#53-12       25    20.51     3979              31.18.022.007.013-2735        355,790,750       50,904,000       51,000,000       5,610,000     1,275,000      2,550,000        60,435,000      295,355,750        355,790,750     173,790,750        295,000,000   PT. SINO PROPERTINDO INTERNASIONAL
        52     C      FLOOR 53    1BR    C#A53-15   City      1      C#53-15       25    20.53     3980              31.18.022.007.013-2736        355,790,750       50,904,000       51,000,000       5,610,000     1,275,000      2,550,000        60,435,000      295,355,750        355,790,750     173,790,750        295,000,000   PT. SINO PROPERTINDO INTERNASIONAL
        53     C      FLOOR 53    1BR    C#A53-17   City      1      C#53-17       25    19.97     3982              31.18.022.007.013-2738        355,790,750       48,704,000       49,000,000       5,390,000     1,225,000      2,450,000        58,065,000      297,725,750        355,790,750     173,790,750        295,000,000   PT. SINO PROPERTINDO INTERNASIONAL
        54     C      FLOOR 50    2BR    C#B50-07   Pool      1      C#50-07       42    30.47     4655              31.18.022.007.013-2658        597,728,460       62,046,000       63,000,000       6,930,000     1,575,000      3,150,000        74,655,000      523,073,460        597,728,460     291,728,460        450,000,000   PT. SINO PROPERTINDO INTERNASIONAL
        55     C      FLOOR 51    2BR    C#B51-07   Pool      1      C#51-07       42    30.47     4386              31.18.022.007.013-2682        597,728,460       62,046,000       63,000,000       6,930,000     1,575,000      3,150,000        74,655,000      523,073,460        597,728,460     291,728,460        450,000,000   PT. SINO PROPERTINDO INTERNASIONAL
        56     C      FLOOR 52    2BR    C#B52-07   Pool      1      C#52-07       42    30.47     3822              31.18.022.007.013-2706        597,728,460       62,046,000       63,000,000       6,930,000     1,575,000      3,150,000        74,655,000      523,073,460        597,728,460     291,728,460        450,000,000   PT. SINO PROPERTINDO INTERNASIONAL
        57     C      FLOOR 52    2BR    C#B52-08   Pool      1      C#52-08       42    33.14     3823              31.18.022.007.013-2707        597,728,460       67,545,000       68,000,000       7,480,000     1,700,000      3,400,000        80,580,000      517,148,460        597,728,460     291,728,460        450,000,000   PT. SINO PROPERTINDO INTERNASIONAL
        58                               HGB 5699                   HGB 5699     7925 7,925.00     05699/Pasirsari                              22,088,400,000   18,639,600,000   18,640,000,000   2,050,400,000   466,000,000    932,000,000    22,088,400,000                 -                                                        PT. SINO PROPERTINDO INTERNASIONAL
         1                               C#A26-26                                  25    20.10          1604                                       355,790,750       48,704,000       49,000,000       5,390,000     1,225,000      2,450,000        58,065,000      297,725,750        597,728,460     291,728,460        450,000,000   PT. SINO PROPERTINDO INTERNASIONAL
         2                               C#A39-06                                  25    18.71          1231                                       355,790,750       46,504,000       47,000,000       5,170,000     1,175,000      2,350,000        55,695,000      300,095,750        597,728,460     291,728,460        450,000,000   PT. SINO PROPERTINDO INTERNASIONAL
         3                               C#B50-08                                  42    33.14          4656                                       597,728,460       67,545,000       68,000,000       7,480,000     1,700,000      3,400,000        80,580,000      517,148,460        597,728,460     291,728,460        450,000,000   PT. SINO PROPERTINDO INTERNASIONAL
         4                               C#A51-10                                  25    20.01          4389                                       355,790,750       48,704,000       49,000,000       5,390,000     1,225,000      2,450,000        58,065,000      297,725,750        597,728,460     291,728,460        450,000,000   PT. SINO PROPERTINDO INTERNASIONAL
         5                               C#A51-11                                  25    20.15          4390                                       355,790,750       48,704,000       49,000,000       5,390,000     1,225,000      2,450,000        58,065,000      297,725,750        597,728,460     291,728,460        450,000,000   PT. SINO PROPERTINDO INTERNASIONAL
         6                               C#A56-03                                  25    20.19          2491                                       355,790,750       48,704,000       49,000,000       5,390,000     1,225,000      2,450,000        58,065,000      297,725,750        597,728,460     291,728,460        450,000,000   PT. SINO PROPERTINDO INTERNASIONAL
         7                               C#A56-06                                  25    18.71          2493                                       355,790,750       46,504,000       47,000,000       5,170,000     1,175,000      2,350,000        55,695,000      300,095,750        597,728,460     291,728,460        450,000,000   PT. SINO PROPERTINDO INTERNASIONAL
         8                               C#A57-06                                  25    18.71          2427                                       355,790,750       46,504,000       47,000,000       5,170,000     1,175,000      2,350,000        55,695,000      300,095,750        597,728,460     291,728,460        450,000,000   PT. SINO PROPERTINDO INTERNASIONAL
         9                               C#A58-06                                  25    18.71          3003                                       355,790,750       46,504,000       47,000,000       5,170,000     1,175,000      2,350,000        55,695,000      300,095,750        597,728,460     291,728,460        450,000,000   PT. SINO PROPERTINDO INTERNASIONAL
        10                               C#A58-11                                  25    20.15          3008                                       355,790,750       48,704,000       49,000,000       5,390,000     1,225,000      2,450,000        58,065,000      297,725,750        597,728,460     291,728,460        450,000,000   PT. SINO PROPERTINDO INTERNASIONAL
        11                               C#A58-12                                  25    20.51          3009                                       355,790,750       50,904,000       51,000,000       5,610,000     1,275,000      2,550,000        60,435,000      295,355,750        597,728,460     291,728,460        450,000,000   PT. SINO PROPERTINDO INTERNASIONAL
        12                               C#A58-27                                  25    19.17          3034                                       355,790,750       46,504,000       47,000,000       5,170,000     1,175,000      2,350,000        55,695,000      300,095,750        597,728,460     291,728,460        450,000,000   PT. SINO PROPERTINDO INTERNASIONAL
        13                               C#B58-07                                  42    30.47          3004                                       597,728,460       62,046,000       63,000,000       6,930,000     1,575,000      3,150,000        74,655,000      523,073,460        597,728,460     291,728,460        450,000,000   PT. SINO PROPERTINDO INTERNASIONAL


Grand Total                                                  57                10,508   9,928.56                                                59,064,693,774   22,909,033,000   22,943,000,000   2,523,730,000   573,575,000   1,147,150,000   27,187,455,000   31,877,238,774     31,651,145,120   15,449,145,120    24,100,000,000

File

File Open PDF
Source IDX
Size2.73 MB
Published12 Jan 2026
Pages10
Characters241,238
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 16 people and organisations named in the text · linked when the evidence is strong

possible person TRI WAHYUNI p.1
possible person MUH ARIFIN p.2
unresolved person DR. MURTONO SABARUDIN p.1
unresolved person Hj RA SRI SUMANI EFFENDHY p.1 ×4
unresolved person H. CHOLIL YUSAK p.1
unresolved person DRS. SOENARNO p.2
unresolved org PT SILIWANGI BIMANTARA PERDANA Advance Payment p.4
unresolved org PT POLLUX ADITAMA KENCANA p.4 ×11
unresolved org PT Pollux Aditama Kencana Audit Adjustment p.4
unresolved org PT Pollux Aditama Kencana PAK p.4
unresolved org PT. POLLUX BARELANG p.4
unresolved org PT. POLLUX BARELANG MEGASUPERBLOK p.4
unresolved org PT. SILIWANGI BIMANTARA PERDANA p.5 ×191
unresolved org PT. BUMI WARDANA p.6 ×309
unresolved org PT. SINO PROPERTINDO INTERNASIONAL p.6 ×72
unresolved org PT. SINO PROPERTINDO INTERNASIONAL Grand Total p.10

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result