Back to announcement
20260112_POLI_Tanggapan atas Permintaan Penjelasan Bursa_32019044_lamp2.pdf
Other Text extracted POLISource file signed link, expires in 15 minutes
Extracted text 10
Page 1
NOMOR & TANGGAL AKTA PPJB Versi Accounting
NO NO SERTIFIKAT/KELURAHAN ATAS NAMA NIB KONVERSI SPPT 2017 SPPT 2016 SPPT 2015 SPPT 2012 SPPT 2024 NOP Biaya Notaris
NO TANGGAL Luas Harga Perolehan
1 HM. 01004/KANDRI MUHLIS 11.01.14.15.00929 2 12/11/2002 D. II 141,440 113,815 53,040 30,000 268,515 33.74.140.015.013-0179.0 1,105 27,625,000
2 HM. 01003/KANDRI MUSLIMIN 11.01.14.15.00928 6 12/11/2002 D. II 142,208 114,433 53,328 30,000 269,973 33.74.140.015.013-0178.0 1,111 27,775,000
3 HM. 00999/KANDRI ACHMAD MUALIM 11.01.14.15.00924 10 12/11/2002 D. II 300,544 241,844 112,704 63,396 570,564 33.74.140.015.013-0177.0 2,348 58,700,000
4 HM. 01000/KANDRI HERMANTO 11.01.14.15.00925 14 12/11/2002 D. II 303,232 244,007 113,712 63,963 575,667 33.74.140.015.013-0176.0 2,369 59,225,000 3,250,000
5 HM. 00998/KANDRI JUNARIYAH 11.01.14.15.00923 18 12/11/2002 D. II 283,264 106,224 59,751 537,759 33.74.140.015.013-0077.0 2,213 55,325,000
6 HM. 00617/KANDRI ASMINI, SALMONAH 11.01.14.15.00766 22 13-12-2002 D. III 2,164,224 870,762 405,792 228,258 4,108,644 33.74.140.015.011-0030.0 8,454 169,080,000
7 HM. 01883/KANDRI SUYONO 11.01.1415.2146 26 13-12-2002 ~ 356,608 286,958 133,728 75,222 574,938 33.74.140.015.013-0175.0 2,366 53,235,000
8 HM. 01881/KANDRI SUROSO NARDI 11.01.1415.2148 30 13-12-2002 D. II 374,528 301,378 140,448 79,002 579,555 33.74.140.015.013-0076.0 2,385 53,662,500
9 HM. 00681/KANDRI KATINI 11.01.14.15.00831 34 13-12-2002 D. II 535,040 430,540 200,640 112,860 1,203,840 33.74.140.015.011-0069.0 4,180 56,430,000 9,750,000
10 HM. 01710/KANDRI ASMADI 11.01.14.15.01529 38 13-12-2002 S. IV 136,320 109,695 51,120 30,000 258,795 33.74.140.015.016-0047.0 1,056 15,750,000
11 HM. 01644/KANDRI MUHRI 11.01.14.15.01463 42 13-12-2002 D. II 221,440 178,190 83,040 46,710 - 33.74.140.015.016-0201.0 1,730 43,250,000
12 HM. 01900/KANDRI BIAH, RUSLAN, RUSMADI Cs 11.0114.15.02208 46 13-12-2002 D. II 225,570 - 33,74,140,015,014-0004,0 3,485 47,850,000
13 HM. 01645/KANDRI SARNAWI 11.01.14.15.01464 50 13-12-2002 D. II 83,040 409,212 33,74,140,015,016-0201,0 1,684 42,100,000
14 HM. 01587/KANDRI TURSIHADI 11.01.14.15.01406 54 16-12-2002 D. II 432,128 347,728 162,048 91,152 820,368 33.74.140.015.016-0009.0 3,376 47,264,000
15 HM. 01703/KANDRI ARBADI 11.01.14.15.01522 58 16-12-2002 D. II 340,608 274,083 127,728 71,847 646,623 33.74.140.015.016-0034.0 2,661 25,279,500
16 HM. 01702/KANDRI SUKARDI 11.01.14.15.01521 62 16-12-2002 S. IV 371,584 299,099 139,344 78,381 705,429 33.74.140.015.016-0164.0 2,903 27,578,500
17 HM. 00667/KANDRI KAMIYAH 11.01.14.15.00817 66 16-12-2002 D. II 140,032 52,512 30,000 265,842 33.74.140.015.011-0098.0 1,094 16,410,000 23,650,000
18 HM. 00720/KANDRI NUR'Aeni 11.01.14.15.01880 70 16-12-2002 D. II 431,232 347,007 161,712 90,963 818,667 33.74.140.015.013-0127.0 3,369 72,433,500
19 HM. 01603/KANDRI NUHYADI 11.01.14.15.01422 74 16-12-2002 D. II 967,808 778,783 362,928 204,147 2,355,257 33.74.140.015.016-0026.0 7,561 113,415,000
20 HM. 01584/KANDRI MUSRIYAH 11.01.14.15.01408 78 16-12-2002 D. II PAID 194,258 90,528 50,922 458,298 33.74.140.015.016-0007.0 1,866 25,191,000 26,000,000
21 HM. 00643/KANDRI NGARIJO 11.01.14.15.00793 82 16-12-2002 D. I 148,992 119,892 55,872 31,428 282,852 33.74.140.015.011-0039.0 1,164 17,460,000
22 HM. 01600/KANDRI MUKHAERI 11.01.14.15.01419 86 17-12-2002 D. II 770,688 620,163 289,008 162,567 1,875,545 33.74.140.015.016-0027.0 6,021 87,304,500
23 HM. 00223/KANDRI KUSTIN 11.01.14.15.00965 90 17-12-2002 S. IV 280,320 105,120 59,130 532,170 33.74.140.015.014-0004.0 2,190 76,650,000
24 HM. 00712/KANDRI KASTIMAH 11.01.14.15.01872 94 17-12-2002 D. I 204,032 164,182 76,512 43,038 387,342 33.74.140.015.013-0126.0 1,594 39,850,000 39,400,000
25 HM. 01039/KANDRI MATORI 11.01.14.15.01894 98 17-12-2002 S. IV 304,128 244,728 114,048 64,152 577,368 33.74.140.015.013-0194.0 2,376 42,768,000
26 HM. 01555/KANDRI NGATINI 11.01.14.15.01374 102 17-12-2002 D. II 123,520 99,395 74,103 277,920 33.74.140.015.016.0051.0 2,638 61,993,000
27 HM. 01550/KANDRI SITI MALIKAH 11.01.14.15.01369 106 18-12-2002 D. IV 133,248 107,223 49,968 30,000 252,963 33.74.140.015.016-0054.0 1,041 33,312,000
28 HM. 00589/KANDRI FAYA ARLOTTY ~ 110 18-12-2002 D. II 2,004,508 33.74.140.015.013-0089.0 4,176 85,608,000
823,680 662,805 308,880 173,745
29 HM. 00590/KANDRI FAYA ARLOTTY ~ 114 18-12-2002 D. II - 33.74.140.015.013-0089.0 2,246 46,043,000
30 HM. 01001/KANDRI SUGIYONO 11.01.14.15.00926 118 18-12-2002 D. II 607,360 488,735 227,760 128,115 1,366,560 33.74.140.015.013-0078.0 4,745 118,625,000
31 HM. 00221/KANDRI SUDARNI 11.01.14.15.00963 122 18-12-2002 S. IV 180,864 145,539 67,824 38,151 343,359 33.74.140.015.014-0005.0 1,413 49,455,000
32 HM. 00722/KANDRI RIBUT YULIANTO 11.01.14.15.01882 126 19-12-2002 D. II 253,312 203,837 94,992 53,433 494,505 33.74.140.015.013-0129.0 2,035 45,787,500
33 HM. 01013/KANDRI NGAIDI 11.01.14.15.00938 130 19-12-2002 D. II 593,408 477,508 222,528 125,172 1,335,168 33.74.140.015.013-0085.0 4,636 115,900,000
34 HM. 00684/KANDRI DR. MURTONO SABARUDIN 11.01.14.15.00834 134 19-12-2002 D. II BILL NOT FOUND 249,775 116,400 65,475 - 33.74.140.015.001-0025.0 2,425 56,987,500
35 HM. 00616/KANDRI SUNARNI 11.01.14.15.00765 138 19-12-2002 D. II 333,824 268,624 125,184 70,416 633,744 33.74.140.015.011-0075.0 2,608 61,228,000
36 HM. 01734/KANDRI ASMU'I 11.01.14.15.01553 142 19-12-2002 D. II 201,088 75,408 42,417 381,753 33.74.140.015.017-0018.0 1,571 14,924,500
37 HM. 01700/KANDRI KASMIDI 11.01.14.15.01519 146 20-12-2002 D. II 469,248 377,598 175,968 98,982 913,437 33.74.140.015.016-0036.0 3,759 37,590,000
38 HM. 00726/KANDRI BADI SULAIMAN 11.01.14.15.01886 150 20-12-2002 D. II 386,816 311,266 145,056 81,594 734,346 33.74.140.015.013-0210.0 3,022 69,506,000
39 HM. 01701/KANDRI KASTONO 11.01.14.15.01520 154 20-12-2002 D. II 450,560 362,560 168,960 95,040 775,170 33.74.140.015.016-0035.0 3,190 30,305,000
40 HM. 01704/KANDRI PARSIKI 11.01.14.15.01523 158 20-12-2002 D. II 509,312 409,837 190,992 107,433 987,552 33.74.140.015.016-0014.0 4,064 40,640,000
41 HM. 01007/KANDRI PATENI 11.01.14.15.00932 162 20-12-2002 D. II 136,320 109,695 51,120 30,000 258,795 33.74.140.015.013-0084.0 1,065 36,210,000
42 HM. 01010/KANDRI PATMI 11.01.14.15.00935 166 20-12-2002 D. II 113,152 91,052 42,432 30,000 214,812 33.74.140.015.013-0184.0 884 30,056,000
43 HM. 01012/KANDRI CHORYATUN 11.01.14.15.00937 170 21-12-2002 D. II 125,440 100,940 47,040 30,000 238,140 33.74.140.015.013-0186.0 980 33,320,000
44 HM. 01011/KANDRI FATONAH 11.01.14.15.00936 174 21-12-2002 D. II 93,056 74,881 34,896 30,000 176,661 33.74.140.015.013-0185.0 727 24,718,000
45 HM. 01009/KANDRI FATIMAH 11.01.14.15.00934 178 21-12-2002 D. II 216,027 889 33,014,000
46 HM. 01006/KANDRI TASLAN 11.01.14.15.00931 182 21-12-2002 D. II 251,904 202,704 94,464 53,136 478,224 33.74.140.015.013-0182.0 1,968 49,200,000 3,250,000
47 HM. 01024/KANDRI MUNAJAD 11.01.14.15.01832 186 21-12-2002 D. II 165,120 132,870 61,920 34,830 313,470 33.74.140.015.013-0090.0 1,290 25,800,000
48 HM. 01023/KANDRI SARTI 11.01.14.15.01831 190 23-12-2002 D. II 171,392 137,917 64,272 36,153 325,377 33.74.140.015.013-0196.0 1,339 26,780,000
49 HM. 00638/KANDRI BEJO ZUHRI 11.01.14.15.00788 194 23-12-2002 D. II 466,432 375,332 174,912 98,388 885,492 33.74.140.015.011-0103.0 3,644 36,440,000
50 HM. 00640/KANDRI MARGIONO 11.01.14.15.00790 198 23-12-2002 D. II 239,872 193,022 89,952 50,598 455,382 33.74.140.015.011-0093.0 1,874 18,740,000 3,250,000.00
51 HM. 01018/KANDRI SITI KALIMAH 11.01.14.15.00943 202 23-12-2002 D. II 105,216 84,666 39,456 30,000 199,746 33.74.140.015.013-0190.0 822 22,605,000 40,250,000
52 HM. 00670/KANDRI SURATNO 11.01.14.15.00820 206 23-12-2002 D. II 187,264 150,689 70,224 39,501 355,509 33.74.140.015.011-0061.0 1,463 21,945,000
53 HM. 01605/KANDRI KODAT MARKORO 11.01.14.15.01424 210 24-12-2002 D. II 307,968 247,818 115,488 64,962 584,658 33.74.140.015.016-0043.0 2,406 27,669,000
54 HM. 00623/KANDRI MOCHAMAD SULAINI 11.01.14.15.00772 214 24-12-2002 D. II 318,976 119,616 67,284 605,556 33.74.140.015.011-0031.0 2,492 37,380,000
55 HM. 01614/KANDRI MARGOYITNO 11.01.14.15.01433 218 24-12-2002 D. II 235,904 189,829 88,464 49,761 447,849 33.74.140.015.016-0178.0 1,843 27,645,000
56 HM. 01016/KANDRI YAHYA 11.01.14.15.00941 222 24-12-2002 D. II 114,304 91,979 42,864 30,000 216,999 33.74.140.015.013-0188.0 893 24,557,500
57 HM. 01017/KANDRI KHAMIM 11.01.14.15.00942 226 24-12-2002 D. II 111,104 89,404 41,664 30,000 210,924 33.74.140.015.013-0189.0 868 23,870,000
58 HM. 01014/KANDRI WAGINI 11.01.14.15.00939 230 26-12-2002 D. II 362,752 291,902 136,032 76,518 688,662 33.74.140.015.013-0086.0 2,834 80,769,000
59 HM. 01695/KANDRI ROWI 11.01.14.15.01514 234 26-12-2002 D. II 210,560 169,435 78,960 44,415 399,735 33.74.140.015.016-0016.0 1,645 16,450,000
60 HM. 01030/KANDRI MURTINAH 11.01.14.15.01838 238 26-12-2002 D. II 198,400 74,400 41,850 376,650 33.74.140.015.013-0096.0 1,550 38,750,000
61 HM. 01019/KANDRI JUMIATI 11.01.14.15.00944 242 26-12-2002 D. II 104,064 83,739 39,024 30,000 197,559 33.74.140.015.013-0191.0 813 22,357,500
62 HM. 01020/KANDRI KOMARIYAH 11.01.14.15.01828 246 26-12-2002 D. II 91,520 73,645 34,320 30,000 173,745 33.74.140.015.013-0192.0 715 19,662,500
63 HM. 00715/KANDRI NGATINAH 11.01.14.15.01875 250 26-12-2002 D. II 257,152 206,927 96,432 54,243 488,187 33.74.140.015.013-0121.0 2,009 80,360,000
64 HM. 00688/KANDRI TOHIRIN 11.01.14.15.01848 7 20-1-2003 D. II 335,872 270,272 125,952 70,848 637,632 33.74.140.015.013-0103.0 2,624 74,784,000
65 HM. 01649/KANDRI SITI MAEMONAH 11.01.14.15.01468 11 20-1-2003 D. I 78,464 63,139 29,424 30,000 148,959 33.74.140.015.016-0188.0 613 9,195,000
66 HM. 00624/KANDRI DAMSIRI 11.01.14.15.00773 15 20-1-2003 D. II 293,120 235,870 109,920 61,830 556,470 33.74.140.015.011-0032.0 2,290 34,350,000
67 HM. 01554/KANDRI ARIS ARIYANTO 11.01.14.15.01373 19 21-1-2003 D. II 31,200 234,252 964 24,400,000
68 HM. 01577/KANDRI MUYADI 11.01.14.15.01396 23 21-1-2003 D. II 750,976 604,301 281,616 158,409 1,827,576 33.74.140.015.016-0020.0 5,857 102,497,500
69 HM. 01558/KANDRI SOFANIDAH 11.01.14.15.01377 27 21-1-2003 D. II 351,232 282,632 131,712 74,088 666,792 33.74.140.015.016-0174.0 2,744 68,600,000
70 HM. 01027/KANDRI MUSIAH 11.01.14.15.01835 31 22-1-2003 D. II 97,152 78,177 36,432 30,000 184,437 33.74.140.015.013-0197.0 759 13,662,000
71 HM. 01922/KANDRI KUS'AN, KUSMIYARDI, KUSLIYANTO, Cs 11.0114.15.02209 35 22-1-2003 D. II 809,600 651,475 303,600 170,775 1,970,243 33.74.140.015.016-0208.0 6,325 101,200,000
72 HM. 01031/KANDRI SITI AISAH 11.01.14.15.01839 39 22-1-2003 D. II 195,456 157,281 73,296 41,229 371,061 33.74.140.015.013-0097.0 1,527 38,175,000
73 HM. 00716/KANDRI SUMADI 11.01.14.15.01876 43 23-1-2003 D. II 696,960 560,835 261,360 147,015 1,696,121 33.74.140.015.013-0122.0 5,445 217,800,000
74 HM.01026/ KANDRI MUSIATUN 47 23-1-2003 D.II 114,432 92,082 217,242 33.74.140.015.013.0093.0 894 16,092,000
75 HM. 01540/KANDRI PANDHU HIDAYAT JATI 11.01.14.15.01359 51 23-01-2003 D. II 59,648 47,998 22,368 30,000 113,238 33.74.140.015.016-0151.0 466 17,475,000
76 HM. 01541/KANDRI DHIMAS AGUNG HARYADI 11.01.14.15.01360 55 24-01-2003 D. II 50,048 40,273 18,768 30,000 95,013 33.74.140.015.016-0150.0 391 14,662,500
77 HM. 01542/KANDRI UMI NUR HIDAYAH 11.01.14.15.01361 59 24-1-2003 D. II 51,584 19,344 30,000 97,929 33.74.140.015.016-0198.0 403 15,112,500
78 HM. 01543/KANDRI SOEDIRDJO AGUNG RAHARDJO 11.01.14.15.01362 63 24-1-2003 D. II 57,216 46,041 21,456 30,000 108,621 33.74.140.015.016-0103.0 447 16,762,500
79 HM. 01521/KANDRI MUSLIMAH 11.01.14.15.00721 67 25-1-2003 D. II 80,546 64,124 28,152 30,000 156,400 33.74.140.015.010-0081.0 782 15,640,000
80 HM. 01522/KANDRI SRI IDAYUMI 11.01.14.15.00722 71 25-1-2002 D. II 77,147 61,418 26,964 31,200 149,800 33.74.140.015.010-0082.0 749 14,980,000
81 HM. 01523/KANDRI TRI WAHYUNI 11.01.14.15.00723 75 25-1-2003 D. II 76,220 60,680 26,640 30,000 148,000 33.74.140.015.010-0083.0 740 14,800,000
82 HM. 01524/KANDRI SATINI 11.01.14.15.00724 79 27-1-2003 D. II 152,955 121,770 53,460 30,000 297,000 33.74.140.015-010-0045.0 1,485 29,700,000
83 HM. 01546/KANDRI MUHAMAD ZAENUDI 11.01.14.15.01365 83 27-1-2003 D. II 69,248 25,968 30,000 131,463 33.74.140.015.016-0171.0 541 20,287,500
84 HM. 01684/KANDRI ROHADI 11.01.14.15.01503 87 28-1-2003 D. II 467,840 376,465 175,440 98,685 888,165 33.74.140.015.016-0065.0 3,655 34,722,500
85 HM. 00696/KANDRI Hj RA SRI SUMANI EFFENDHY 11.01.14.15.01856 91 29-1-2003 D. II 135,424 108,974 50,784 30,000 257,094 33.74.140.015.013-0183.0 1,058 16,119,000
86 HM. 00697/KANDRI Hj RA SRI SUMANI EFFENDHY 11.01.14.15.01857 95 29-1-2003 D. II 375,680 302,305 79,245 713,205 33.74.140.015.013-0219-0 2,935 44,714,800
87 HM. 00698/KANDRI Hj RA SRI SUMANI EFFENDHY 11.01.14.15.01858 99 29-1-2003 D. II 446,720 359,470 167,520 94,230 848,070 33.74.140.015.013-0110.0 3,490 53,170,200
88 HM. 01015/KANDRI KARMADI 11.01.14.15.00940 103 30-1-2003 D. II 267,904 215,579 100,464 56,511 508,599 33.74.140.015.013-0087.0 2,093 57,557,500
89 HM. 00704/KANDRI Hj RA SRI SUMANI EFFENDHY 11.01.14.15.01864 107 30-1-2003 D. II 365,440 294,065 137,040 77,085 693,765 33.74.140.015.013-0116.0 2,855 43,496,000
90 HM. 01648/KANDRI NUR ARIFIN 11.01.14.15.01467 111 31-1-2003 S. IV 80,512 64,787 30,192 30,000 152,847 33.74.140.015.016-0203.0 629 9,435,000
91 HM. 01520/KANDRI BEJO bin MIAN 11.01.14.15.00720 115 31-1-2003 D. II 486,263 387,122 169,956 94,420 944,200 33.74.140.015.010-0044.0 4,721 106,222,500
92 HM. 00629/KANDRI MUSTAIN 11.01.14.15.00779 2 22-2-2003 D. I 539,904 434,454 202,464 113,886 1,214,784 33.74.140.015.011-0046.0 3,488 34,880,000
93 HM. 01594/KANDRI SATINAH 11.01.14.15.01413 6 22-2-2003 D. II 122,880 98,880 46,080 30,000 233,280 33.74.140.015.016-0153.0 960 12,000,000
94 HM. 01576/KANDRI MUYADI 11.01.14.15.01395 5 26-3-2003 S. IV 458,752 369,152 172,032 96,768 870,912 33.74.140.015.016-0023.0 3,584 62,720,000
95 HM. 01597/KANDRI SARIYATI 11.01.14.15.01416 9 26-3-2003 D. II 82,432 66,332 30,912 30,000 156,492 33.74.140.015.016-0152.0 644 8,050,000 10,000,000
96 HM. 01608/KANDRI SUPARIYAH 11.01.14.15.01427 13 27-3-2003 S. IV 185,984 149,659 69,744 39,231 353,079 33.74.140.015.016-0166.0 1,453 16,709,500
97 HM. 00207/KANDRI RICARDO JEMMY D 11.01.14.15.00947 17 28-3-2003 D. IV 126,976 102,176 47,616 30,000 241,056 33.74.140.015.014-0008.0 992 39,680,000
98 HM. 00209/KANDRI RONALDI JESSY D 11.01.14.15.00949 21 28-3-2003 D. IV 145,536 117,111 54,576 30,000 276,291 33.74.140.015.014-0354.0 1,137 45,480,000
99 HM. 00210/KANDRI ROZANTIE JOICE D 11.01.14.15.00950 25 28-3-2003 D. IV 130,432 104,957 48,912 30,000 247,617 33.74.140.015.014-0355.0 1,019 40,760,000
100 HM. 01040/KANDRI RUSMADI 11.01.14.15.01895 5 25-4-2003 S. III 435,584 350,509 163,344 91,881 826,929 33.74.140.015.013-0193.0 3,403 76,567,500
101 HM. 01646/KANDRI SUPARTI 11.01.14.15.01465 9 26-04-2003 S. IV 338,688 272,538 127,008 71,442 642,978 33.74.140.015.016-0193.0 2,646 39,690,000
102 HM. 01022/KANDRI H. CHOLIL YUSAK 11.01.14.15.01830 13 28-04-2003 S. IV 529,664 426,214 198,624 111,726 1,191,744 33.74.140.015.013-0091.0 4,138 82,760,000
103 HM. 01606/KANDRI SUGIRI 11.01.14.15.01425 17 29-04-2003 S. IV 236,672 88,752 49,923 449,307 33.74.140.015.016-0042.0 1,849 18,490,000
104 HM. 01573/KANDRI ALMUKAYAH 11.01.14.15.01392 21 30-04-2003 S. IV 80,256 64,581 30,096 30,000 152,361 33.74.140.015.016-0121.0 627 10,972,500
105 HM. 01574/KANDRI SOLIKIN 11.01.14.15.01393 2 20-05-2003 S. IV 94,208 75,808 35,328 30,000 178,848 33.74.140.015.016-0137.0 736 12,880,000
106 HM. 01572/KANDRI ASPIAH 11.01.14.15.01391 6 20-05-2003 S. IV 116,992 94,142 43,872 30,000 222,102 33.74.140.015.016-0022.0 914 15,995,000
107 HM. 01604/KANDRI ASBARI 11.01.14.15.01423 10 21-05-2003 S. IV 652,672 525,197 244,752 137,673 1,588,343 33.74.140.015.016-0045.0 5,099 76,485,000
108 HM. 00208/KANDRI RAMONO JEFFRY D 11.01.14.15.00948 14 21-05-2003 D. IV 164,352 132,252 61,632 34,668 312,012 33.74.140.015.014-0002.0 1,284 53,928,000
109 HM. 01650/KANDRI ROHIYATUN 11.01.14.15.01469 18 22-05-2003 S. IV 187,008 150,483 70,128 39,447 355,023 33.74.140.015.016-0089.0 884 13,260,000
110 HM. 01021/KANDRI NURYADI 11.01.14.15.01828 22 22-05-2003 S. IV 309,888 249,363 116,208 65,367 588,303 33.74.140.015.013-0195.0 2,421 60,525,000
111 HM. 00687/KANDRI TASRI 11.01.14.15.01847 26 23-05-2003 D. II 259,328 208,678 97,248 54,702 504,711 33.74.140.015.013-0102.0 2,026 56,728,000
Page 2
112 HM. 00693/KANDRI JUYANAH 11.01.14.15.01853 30 23-05-2003 D. II 480,000 386,250 180,000 101,250 911,250 33.74.140.015.013-0106.0 3,750 93,750,000
113 HM. 01705/KANDRI SUYATMAN 11.01.14.15.01524 34 24-05-2003 D. II 296,064 238,239 111,024 62,451 562,059 33.74.140.015.016-0015.0 2,313 23,130,000
114 HM. 01025/KANDRI SUMIHARTO 11.01.14.15.01833 38 24-05-2003 D. II 124,032 99,807 46,512 30,000 235,467 33.74.140.015.013-0092.0 969 17,442,000
115 HM. 00702/KANDRI SUKADI 11.01.14.15.01862 42 26-05-2003 D. II 466,944 375,744 175,104 98,496 886,464 33.74.140.015.013-0114.0 3,648 63,840,000
116 HM. 00672/KANDRI IKHSAN 11.01.14.15.00822 46 26-5-2003 D. II 315,008 253,483 118,128 66,447 598,023 33.74.140.015.011-0062.0 2,461 43,067,500
117 HM. 00993/KANDRI SUMAERI 11.01.14.15.00918 50 27-5-2003 D. II 101,888 81,988 38,208 30,000 193,428 33.74.140015.013-0172.0 796 20,000,000
118 HM. 01561/KANDRI SUHARI 11.01.14.15.01380 8 28-6-2003 D. II 174,464 140,389 65,424 36,801 331,209 33.74.140.015.016-0168.0 1,363 28,623,000
119 HM. 01611/KANDRI DJUWARI 11.01.14.15.01430 12 28-06-2003 S. IV 360,576 290,151 135,216 76,059 684,531 33.74.140.015.016-0059.0 2,687 40,305,000
120 HM. 00992/KANDRI AMBAN ROEBIAH 11.01.14.15.00917 16 30-06-2003 D. II 810,112 275,834 128,544 72,306 650,754 33.74.140.015.013-0171.0 2,678 70,000,000
121 HM. 00641/KANDRI RUSYATUN 11.01.14.15.00791 20 30-6-2003 D. II 254,464 204,764 95,424 53,676 483,084 33.74.140.015.011-0092.0 1,988 23,856,000
122 HM. 00808/KANDRI AKHMAD MUSYAFAK bin ROCHMAD 11.01.14.15.00364 1 07/01/2003 D. II 207,442 165,148 72,504 40,280 402,800 33.74.140.015.012-0014.0 2,014 80,000,000
123 HM. 00656/KANDRI EKO WATI 11.01.14.15.00806 5 07/01/2003 D. II 500,352 402,627 187,632 105,543 949,887 33.74.140.015.011-0058.0 3,909 80,000,000
124 HM. 01926/KANDRI KASTI 11.0114.15.02253 9 07/02/2003 D. II 401,408 323,008 150,528 84,672 789,750 33.74.140.015.013-0135.0 3,720 130,000,000
125 HM. 01697/KANDRI SOFIYAH 11.01.14.15.01516 13 07/02/2003 D. II 492,800 396,550 184,800 103,950 935,550 33.74.140.015.016-0161.0 3,850 42,350,000
126 HM. 01631/KANDRI MARTI'AH 11.01.14.15.01450 17 07/03/2003 D. I PAID 78,589 36,624 30,000 185,409 33.74.140.015.016-0099.0 763 11,445,000
127 HM. 01931/KANDRI WARTINAH, TARUDI, MUSIYATI 11.0114.15.02250 21 07/03/2003 D. II 206,080 165,830 77,280 43,470 413,829 33.74.140.015.013-0198.0 1,703 30,654,000
128 HM. 01923/KANDRI FAHRUR, MATROZI, SITI MUNJIATI 11.0114.15.02254 25 07/04/2003 S. IV 123,904 99,704 46,464 30,000 278,784 33.74.140.015.016-0030.0 1,700 17,000,000
129 HM. 01592/KANDRI KOTIMAH 11.01.14.15.01411 29 07/04/2003 D. II 358,016 288,091 134,256 75,519 679,671 33.74.140.015.016-0003.0 2,797 27,970,000
130 HM. 00695/KANDRI RIYATI 11.01.14.15.01855 33 07/05/2003 D. I 133,504 107,429 50,064 30,000 253,449 33.74.140.015.013-0203.0 1,043 26,075,000
131 HM. 00734/KANDRI SUMARNI 11.01.14.15.01897 37 07/05/2003 D. II 160,000 128,750 60,000 33,750 303,750 33.74.140.015.013-0108.0 1,250 31,250,000
132 HM. 01513/KANDRI WIDODO NOTO PRAWIRO 11.01.14.15.00713 41 07/07/2003 D. II 229,999 183,106 80,388 44,660 446,600 33.74.140.015.010-0021.0 2,233 55,825,000
133 HM. 01575/KANDRI WIDODO NOTO PRAWIRO 11.01.14.15.01394 45 07/07/2003 D. II 311,040 250,290 116,640 65,610 590,490 33.74.140.015.016-0123.0 2,430 30,375,000
134 HM. 01578/KANDRI WIDODO NOTO PRAWIRO 11.01.14.15.01397 49 07/08/2003 D. II 158,208 127,308 59,328 33,372 300,348 33.74.140.015.016-0159.0 1,236 19,776,000
135 HM. 01579/KANDRI WIDODO NOTO PRAWIRO 11.01.14.15.01398 7 10/06/2003 D. II 230,656 185,606 86,496 48,654 437,886 33.74.140.015.016-0157..0 1,802 27,030,000
136 HM. 01670/KANDRI SARIYATI 11.01.14.15.01489 11 10/08/2003 D. II 163,840 131,840 61,440 34,560 311,040 33.74.140.015.016-0087.0 1,280 19,200,000
137 HM. 01580/KANDRI WIDODO NOTO PRAWIRO 11.01.14.15.01399 15 10/11/2003 D. II 242,432 195,082 90,912 51,138 460,242 33.74.140.015.016-0019.0 1,894 28,410,000
138 HM. 00694/KANDRI SUHADI 11.01.14.15.01854 19 15-10-2003 D. I 168,064 135,239 63,024 35,451 319,059 33.74.140.015.013-0107.0 1,313 32,825,000
139 HM. 00682/KANDRI TUMIDI 11.01.14.15.00832 23 16-10-2003 D. III 353,152 284,177 132,432 74,493 670,437 33.74.140.015.011-0070.0 2,759 27,590,000
140 HM. 01581/KANDRI WIDODO NOTO PRAWIRO 11.01.14.15.01400 27 18-10-2003 D. II 180,992 145,642 67,872 38,178 343,602 33.74.140.015.016-0158.0 1,414 21,210,000
141 HM. 00663/KANDRI ISMAIL, SITI RIKANAH 11.01.14.15.00813 31 20-10-2003 D. II 232,704 187,254 87,264 49,086 441,774 33.74.140.015.011-0065.0 1,818 31,815,000
142 HM. 01598/KANDRI RUKAYAH 11.01.14.15.01417 35 21-10-2003 D. II 270,848 217,948 101,568 57,132 526,338 33.74.140.015.016-0154.0 2,166 27,075,000
143 HM. 00721/KANDRI IMYATI 11.01.14.15.01881 39 23-10-2003 D. II 529,808 426,008 198,528 111,672 1,191,168 33.74.140.015.013-0128.0 4,297 135,355,500
144 HM. 00692/KANDRI NOVI AMBARWATI 11.01.14.15.01852 43 25-10-2003 D. II 130,048 104,648 48,768 30,000 246,888 33.74.140.015.013-0105.0 1,016 32,004,000
145 HM. 01028/KANDRI SUJARWADI 11.01.14.15.01836 47 27-10-2003 D. II 427,008 343,608 160,128 90,072 810,648 33.74.140.015.013-0094.0 3,336 91,740,000
146 HM. 01582/KANDRI WIDODO NOTO PRAWIRO 11.01.14.15.01401 51 28-10-2003 D. II 236,928 190,653 88,848 49,977 449,793 33.74.140.015.016-0018.0 1,851 24,063,000
147 HM. 01927/KANDRI ABDUL HADI 11.0114.15.02256 55 29-10-2003 D. II 31,200 468,261 1,927 23,124,000
148 HM. 01583/KANDRI WIDODO NOTO PRAWIRO 11.01.14.15.01402 59 30-10-2003 D. II 195,200 157,075 73,200 41,175 370,575 33.74.140.015.016-0008.0 1,525 19,825,000
149 HM. 00619/KANDRI BAKRI 11.01.14.15.00768 63 30-10-2003 D. II 370,816 298,391 139,056 78,219 703,971 33.74.140.015.011.0037.0 2,897 72,425,000
150 HM. 01591/KANDRI BEJO 11.01.14.15.01410 67 31-10-2003 D. II 705,152 567,427 264,432 148,743 1,716,058 33.74.140.015.016-0002.0 5,509 55,090,000
151 HM. 01708/KANDRI RUSLAN 11.01.14.15.01527 6 11/10/2003 S. IV 266,880 214,755 100,080 56,295 506,655 33.74.140.015.016-0165.0 2,077 25,962,500
152 HM. 01029/KANDRI AHMAD NAIMIN, MUH ARIFIN, NASIKUN 11.01.14.15.01837 13 19-11-2003 D. II 366,464 294,889 137,424 77,301 695,709 33.74.140.015.013-0095.0 2,863 74,438,000
153 HM. 01593/KANDRI SARMIDI 11.01.14.15.01412 17 20-11-2003 D. II 206,336 166,036 77,376 43,524 391,716 33.74.140.015.016-0010.0 1,612 20,150,000
154 HM. 01595/KANDRI MUSTAKIM 11.01.14.15.01414 21 20-11-2003 D. II 314,624 253,174 117,984 66,366 597,294 33.74.140.015.016-0205.0 2,458 30,725,000
155 HM. 01647/KANDRI HUFRON 11.01.14.15.01466 25 21-11-2003 S. IV 187,264 150,689 70,224 39,501 355,509 33.74.140.015.016-0098.0 1,463 22,500,000
156 HM. 01008/KANDRI DAWAMIN 11.01.14.15.00933 6 17-12-2003 D. II 2,136,576 859,638 400,608 225,342 4,056,156 33.74.140.015.013-0181.0 8,346 300,000,000
157 HM. 01596/KANDRI KOIMAN 11.01.14.15.01415 10 18-12-2003 D. II 257,408 207,133 96,528 54,297 488,673 33.74.140.015.016-0206.0 2,011 25,137,500
158 HM. 00630/KANDRI MUYANAH 11.01.14.15.00780 14 18-12-2003 D. II 254,720 204,970 95,520 53,730 483,570 33.74.140.015.011-0047.0 1,990 17,910,000
159 HM. 01711/KANDRI MUSAWAROTUL LISAKDIYAH, MIFTAKUL M 11.01.14.15.01530 18 19-12-2003 D. II 190,080 152,955 71,280 40,095 360,855 33.74.140.015.016-0012.0 1,485 16,335,000
160 HM. 00723/KANDRI ENDANG RUKMINI 11.01.14.15.01883 2 01/10/2004 D. II 223,360 179,735 83,760 47,115 479,196 33.74.140.015.013-0209.0 1,972 49,300,000 18,300,000
161 HM. 01671/KANDRI ACHMAD NASIR 11.01.14.15.01490 9 23-01-2004 D. II 334,336 269,036 125,376 70,524 634,716 33.74.140.015.016-0088.0 2,612 52,240,000
162 HM. 01679/KANDRI SUHARIYONO 11.01.14.15.01498 13 23-1-2004 D. I 563,840 453,715 211,440 118,935 1,268,640 33.74.140.015.016-0071.0 4,722 94,440,000
163 HM. 00615/KANDRI SARMAN 11.01.14.15.00764 1 02/05/2004 D. III 307,200 247,200 115,200 64,800 583,200 33.74.140.015.011-0026.0 2,400 72,000,000
164 HM. 01627/KANDRI DRS. H.A.M ARCHAM 11.01.14.15.01446 5 02/05/2004 D. II 95,488 76,838 35,808 30,000 181,278 33.74.140.015.016-0083.0 746 11,190,000 7,750,000
165 HM. 01557/KANDRI AMINI SURI 11.01.14.15.01376 9 02/05/2004 D. II 253,824 204,249 95,184 53,541 481,869 33.74.140.015.016-0057.0 1,983 54,532,500
166 HM. 00631/KANDRI JUMIYATI 11.01.14.15.00781 13 02/05/2004 D. II 321,280 258,530 120,480 67770 609930 33.74.140.015.011-0048.0 2,111 21,110,000
167 HM. 01928/KANDRI KUSLIYANTO 11.0114.15.02259 18 02/06/2004 S. IV 264,960 213,210 99,360 55,890 503,010 33.74.140.015.016-0118.0 1,770 30,975,000
168 HM. 00669/KANDRI JANUDI, NGARPIAH 11.01.14.15.00819 20 02/12/2004 D. II 159,872 128,647 59,952 33,723 303,507 33.74.140.015.011-0060.0 1,249 24,980,000
169 HM. 01706/KANDRI SAWINI WAKIMAN 11.01.14.15.01525 1 03/03/2004 D. II 467,968 376,568 175,488 98,712 986,337 33.74.140.015.016-0011.0 4,059 50,737,500
170 HM. 00724/KANDRI MUNJAROAH 11.01.14.15.01884 5 03/03/2004 D. II 484,352 389,752 181,632 102,168 1,089,792 33.74.140.015.013-0212.0 4,445 122,237,500
171 HM. 00714/KANDRI ASPARI 11.01.14.15.01874 9 18-3-2004 D. II 277,504 223,304 104,064 58,536 526,824 33.74.140.015.013-0124.0 2,168 81,300,000
172 HM. 00676/KANDRI NUR ARIFIN 11.01.14.15.00826 13 18-3-2004 D. III 243,968 196,318 91,488 51,462 463,158 33.74.140.015.011-0114.0 1,906 33,355,000
173 HM. 00706/KANDRI MUSLIH 11.01.14.15.01866 17 26-03-2004 D. II 810,112 651,887 303,792 170,883 1,971,490 33.74.140.015.013-0130.0 5,401 148,527,500
174 HM. 01607/KANDRI JAHURI 11.01.14.15.01426 21 26-3-2004 D. II 340,736 274,186 127,776 71,874 646,866 33.74.140.015.016-0044.0 2,662 46,585,000 15,500,000
175 HM. 00673/KANDRI UNTUNG KUSIONO 11.01.14.15.00823 3 13-4-2004 D. II 199,040 160,165 74,640 41,985 377,865 33.74.140.015.011-0111.0 1,344 26,880,000
176 HM. 00671/KANDRI SRI KANTI 11.01.14.15.00821 7 21-04-2004 D. II 350,592 282,117 131,472 73,953 665,577 33.74.140.015.011-0112.0 2,739 54,780,000
177 HM. 6/KANDRI MARSELUS SRIENDRO UTOMO ~ 2 04/04/2004 D. II 10,716,570 33.74.140.015.013-0101.0 14,590 948,350,000
5,532,492 658,464
178 HM. 1/CEPOKO MARSELUS SRIENDRO UTOMO ~ 6 05/04/2004 D. II - 33.74.140.015.013-0101.0 6,655 432,575,000
179 HM. 00636/KANDRI NUR HADI 11.01.14.15.00786 17 27-5-2004 D. II 568,064 457,114 213,024 119,826 1,278,144 33.74.140.015.011-0052.0 4,438 55,475,000 2,000,000
180 HM. 00711/KANDRI ASROKAH 11.01.14.15.01871 3 22-06-2004 D. II 254,848 95,568 53,757 483,813 33.74.140.015.013-0125.0 1,991 72,000,000
181 HM. 00733/KANDRI MUHRAMIN, SA 11.01.14.15.01896 1 07/02/2004 D. II 518,400 417,150 194,400 109,350 984,150 33.74.140.015.013-0204.0 4,050 81,000,000
182 HM. 01688/KANDRI TRIYUNI 11.01.14.15.01507 5 07/02/2004 D. II 328,448 264,298 123,168 69,282 623,538 33.74.140.015.016-0038.0 2,566 35,924,000
183 HM. 00699/KANDRI MUHRAMIN, SA 11.01.14.15.01859 9 07/02/2004 D. II 135,040 108,665 50,640 30,000 256,365 33.74.140.015.013-0112.0 1,055 21,100,000
184 HM. 01585/KANDRI SURADI, MUKINAH 11.01.14.15.01404 40 24-7-2004 D. II 275,072 221,347 103,152 58,023 522,207 33.74.140.015.016-0005.0 2,149 38,682,000
185 HM. 01657/KANDRI UNTUNG KUSIONO 11.01.14.15.01476 44 24-07-2004 S. III 36,352 29,252 13,632 30,000 69,012 33.74.140.015.016-0177.0 284 4,260,000
186 HM. 00674/KANDRI KARMINAH 11.01.14.15.00824 3 08/06/2004 D. II 260,736 209,811 97,776 54,999 494,991 33.74.140.015.011-0113.0 2,030 38,570,000
187 HM. 01511/KANDRI SRI WAHYUDIN SYAMSIYAH 11.01.14.15.00711 6 23-9-2004 D. II 82,240 65,792 32,896 30,000 146,490 33.74.140.015.011-0087.0 2,730 68,250,000
188 HM. 01512/KANDRI AGUS SULISTIYONO 11.01.14.15.00712 10 23-09-2004 D. II 84,640 67,712 33,856 30,000 150,765 33.74.140.015.011-0024.0 2,279 56,975,000
189 HM. 01696/KANDRI SUNARIYAH 11.01.14.15.01515 7 10/12/2004 D. II 443,264 356,689 166,224 93,501 841,509 33.74.140.015.016-0033.0 3,463 48,482,000
190 HM. 00657/KANDRI AS'ARI 11.01.14.15.00807 11 10/12/2004 D. II 208,384 167,684 78,144 43,956 395,604 33.74.140.015.011-0077.0 1,628 29,304,000
191 HM. 01589/KANDRI PARNI 11.01.14.15.01408 35 27-10-2004 D. II 528,768 425,493 198,288 111,537 1,189,728 33.74.140.015.016-0124.0 4,939 88,902,000 9,750,000
192 HM. 00685/KANDRI MURO'AH 11.01.14.15.00835 2 12/07/2004 D. II 461,184 371,109 172,944 97,281 875,529 33.74.140.015.011-0054.0 3,435 44,655,000
193 HM. 01586/KANDRI SUMARNI 11.01.14.15.01405 13 30-12-2004 S. III 238,080 191,580 89,280 50,220 451,980 33.74.140.015.016-0149.0 1,860 33,480,000
194 HM. 01588/KANDRI SUTARNO 11.01.14.15.01407 17 30-12-2004 S. III 231,808 186,533 86,928 48,897 440,073 33.74.140.015.016-0004.0 1,811 32,598,000
195 HM. 01682/KANDRI NASOKAH 11.01.14.15.01501 21 30-12-2004 S. IV 429,184 345,359 160,944 90,531 814,779 33.74.140.015.016-0062.0 3,353 65,383,500
196 HM. 01707/KANDRI MUHAMAD DAVID SETYAWAN 11.01.14.15.01526 26 30-12-2004 D. II 227,456 183,031 85,296 47,979 431,811 33.74.140.015.016-0138.0 1,777 26,655,000
197 HM. 01002/KANDRI RAPIYAH 11.01.14.15.00927 30 31-12-2004 D. II 278,528 224,128 104,448 58,752 528,768 33.74.140.015.013-0079.0 2,176 97,920,000
198 HM. 01933/KANDRI SUMIRAH 11.0114.15.02270 34 31-12-2004 S. IV 161,664 130,089 60,624 34,101 363,744 33.74.140.015.016-0155.0 1,498 14,980,000
199 HM. 00994/KANDRI MUHAMAD SAEFODIN 11.01.14.15.00919 1 01/08/2005 D. II 96,512 77,662 36,192 31,200 183,222 33.74.140.015.013.0173.0 754 22,620,000
200 HM. 01698/KANDRI SUKIYAH 11.01.14.15.01517 5 01/03/2005 D. II 439,936 354,011 164,976 92,799 835,191 33.74.140.015.016-0162.0 3,437 60,147,500 9,750,000
201 HM. 00659/KANDRI SUGIRI 11.01.14.15.00809 84 29-11-2006 D. III 283,136 227,836 106,176 59,724 537,516 33.74.140.015.011-0056.0 2,212 44,240,000
202 HM. 00664/KANDRI YULIATI 11.01.14.15.00814 88 29-11-2006 D. II 420,352 338,252 157,632 88,668 798,012 33.74.140.015.011-0064.0 3,284 65,680,000
203 HM. 01934/KANDRI DRS. SOENARNO 11.01.14.15.02271 92 29-11-2006 D. II 209,090 166,460 73,080 40,600 446,000 33.74.140.015.012-0073.0 2,230 100,350,000 9,750,000
204 HM. 00717/KANDRI YOHANES YOPIE 11.01.14.15.01877 96 30-11-2006 D.II 600,192 482,967 225,072 131,667 1,350,432 33,74,140,015,013-0220,0 4,689 281,340,000
205 HM. 00731/KANDRI YOHANES YOPIE, HANA ERNAWATI 11.01.14.15.01891 100 30-11-2006 D. II 208,128 167,478 78,048 43,902 395,118 33.74.140.015.013-0123.0 1,626 89,430,000
206 HM. 00718/KANDRI RENITA JUWITA 11.01.14.15.01878 104 30-11-2006 D. II 101,376 38,016 30,000 192,456 33.74.140.015.013-0208.0 792 39,600,000
207 HM. 00661/KANDRI LISTIYOWATI 11.01.14.15.00811 2 12/07/2006 D. III 139,904 112,579 52,464 30,000 265,599 33.74.140.015.011-0105.0 1,093 20,220,500
208 HM. 01037/KANDRI RUSMAN 11.01.14.15.01845 6 12/07/2006 D. II 319,744 257,294 119,904 67,446 607,014 33.74.140.015.013-0098.0 2,498 125,000,000
209 HM. 00686/KANDRI SUHARTI 11.01.14.15.01846 10 12/07/2006 D. II 95,616 76,941 35,856 30,000 181,521 33.74.140.015.013-0202.0 747 37,350,000
210 HM. 00675/KANDRI EDRIS bin WIRYO 11.01.14.15.00825 4 02/07/2007 D. III 265,600 213,725 99,600 56,025 504,225 33.74.140.015.011-0063.0 2,075 41,500,000
211 HM. 00654/KANDRI ASRIATI 11.01.14.15.00804 18 15-02-2007 D. II 121,984 98,159 45,744 30,000 231,579 33.74.140.015.011-0057.0 953 17,630,500
212 HM. 00665/KANDRI TURYATI 11.01.14.15.00815 22 15-2-2007 D. II 127,232 102,382 47,712 30,000 286,272 33.74.140.015.011-0109.0 1,204 25,284,000
213 HM. 00725/KANDRI KHAMIM 11.01.14.15.01885 30 28-2-2007 D. II 463,488 372,963 173,808 97,767 946,728 33.74.140.015.013-0213.0 3,896 202,592,000
214 HM. 01005/KANDRI SURYANTI 11.01.14.15.00930 1 04/02/2007 D. II 688,896 554,346 258,336 145,314 1,676,498 33.74.140.015.013-0083.0 5,382 242,190,000
215 HM. 00690/KANDRI KUWAT SUPRIYANTO 11.01.14.15.01850 5 04/02/2007 D. II 120,064 96,614 45,024 30,000 227,934 33.74.140.015.013-0201.0 938 39,396,000
216 HM. 00691/KANDRI ISTIYANAH 11.01.14.15.01851 9 04/02/2007 D. II 110,976 89,301 41,616 30,000 210,681 33.74.140.015.013-0218.0 867 36,414,000
217 HM. 00689/KANDRI PUNIJAH 11.01.14.15.01849 13 04/02/2007 D. II 223,616 179,941 83,856 47,169 424,521 33.74.140.015.013-0104.0 1,747 73,374,000 29,950,000
218 HM. 00729/KANDRI MUSTAIN 11.01.14.15.01889 17 04/02/2007 D. II 592,000 476,375 222,000 124,875 1,332,000 33.74.140.015.013-0132.0 4,759 211,775,500
219 HM. 01890/KANDRI ANI SETIYOWATI 1101.1415.2184 12 06/07/2007 ~ 267,300 1,100 71,500,000
220 HM. 00710/KANDRI SUJIYANTO 11.01.14.15.01870 26 20-7-2007 D. II 430,208 346,183 161,328 90,747 816,723 33.74.140.015.013-0119.0 3,361 218,465,000
221 HM. 01891/KANDRI FAHRUROZI 1101.1415.2183 27 16-8-2007 ~ 916,096 737,171 343,536 193,239 2,229,413 33.74.140.015.013-0118.0 5,969 387,985,000
222 HM. 00709/KANDRI PIPIT DAMAI PRAETYAWAN 11.01.14.15.01869 31 16-8-2007 D. II 429,824 345,874 161,184 90,666 815,994 33.74.140.015.013-0207.0 3,358 218,270,000
223 HM. 00708/KANDRI AGUS MUNIR 11.01.14.15.01868 35 16-8-2007 D. II 438,528 352,878 164,448 92,502 832,518 33.74.140.015.013-0206.0 3,426 222,690,000
224 HM. 00668/KANDRI NURYATI 11.01.14.15.00818 13 14-11-2007 D. II 142,208 114,433 53,328 30,000 269,973 33.74.140.015.011-0110.0 1,111 22,220,000
Page 3
143,680,461 JUMLAH HARGA PEROLEHAN 536,993 13,368,615,500 261,550,000
BIAYA NOTARIS LAIN-LAIN 765,156,600.00
TOTAL 536,993 13,368,615,500 1,026,706,600
TOTAL UMPM 14,395,322,100
Page 4
PT SILIWANGI BIMANTARA PERDANA
Advance Payment - Others
2024
TANGGAL NO DOC. REFF KETERANGAN DEBIT KREDIT SALDO KET2
30/09/2023 JM23090015 Reclass Advance Receipt => Advance Payment / PEMBAYARAN 58 UNIT TOWER A PT POLLUX ADITAMA KENCANA / M123090014
36,720,169,658.00 - 36,720,169,658.00 PAK
30/09/2023 JM23090015 Reclass Advance Receipt => Advance Payment / PEMBAYARAN UNIT TOWER A PT POLLUX ADITAMA KENCANA / M123090015
225,611,680.00 - 36,945,781,338.00 PAK
30/09/2023 JM23090015 Reclass Advance Receipt => Advance Payment / PPN in atas sisa 28 unit tower A PT Pollux Aditama Kencana / JM23090013 - 1,882,806,111.00 35,062,975,227.00 PAK
02/10/2023 M123100002 - CICILAN PEMBAYARAN 15 TOWER A PT. POLLUX ADITAMA KENCANA 3,750,000,000.00 - 38,812,975,227.00 PAK
02/10/2023 M123100002 - CICILAN PEMBAYARAN TOWER A PT. POLLUX ADITAMA KENCANA 225,968,287.00 - 39,038,943,514.00 PAK
06/10/2023 M923100008 0 Cicilan Pembayaran Tower A PT. Pollux Aditama Kencana 1,000,000,000.00 - 40,038,943,514.00 PAK
31/10/2023 JM23100011 M123090014,JM23090013 PPN atas 86 unit yang sudah terbit pada Sept 2023 / M123090014,JM23090013 5,922,024,773.00 - 45,960,968,287.00 PAK
31/12/2023 JM23120019 AUD ADJ 23 Audit Adjustment 2023 / Uang muka Pembelian Apartemen Tower A PT Pollux Aditama Kencana Audit Adjustment 2023 6,632,800,343.00
/ Uang Muka PPN atas Pembelian Apartemen -Tower A PT Pollux Aditama Kencana PAK
52,593,768,630.00 (65 unit tahap 1, 123 unit + 1 HGB tahap 2)
16/04/2024 M124040002 M1 CICILAN PEMBAYARAN TOWER A PT. POLLUX ADITAMA KENCANA 185,000,000.00 0 52,778,768,630.00 PAK
06/05/2024 M124050002 CB UANG MUKA PEMBELIAN APARTEMEN POLLUX ADITAMA KENCANA 77,050,000.00 0 52,855,818,630.00 PAK
06/05/2024 M124050003 CB CICILAN PEMBAYARAN TOWER A PT. POLLUX ADITAMA KENCANA 40,088,729.00 0 52,895,907,359.00 PAK
13/05/2024 M124050005 CB CICILAN PEMBAYARAN TOWER A PT. POLLUX ADITAMA KENCANA 185,000,000.00 0 53,080,907,359.00 PAK
31/05/2024 JM24050007 GL PPN atas 30 Unit Apartemen Tower C&D di Cikarang PT Pollux Aditama Kencana pada Mei 2024 169,510,000.00 - 53,250,417,359.00 PAK
31/05/2024 JM24050007 GL Pembelian 30 Unit apartemen Tower C&D di Cikarang PT Pollux Aditama Kencana pada Mei 2024 - 11,886,682,210.00 41,363,735,149.00 PAK
06/11/2024 M124110002 CB PEMBELIAN UNIT POLLUX ADITAMA KENCANA 137,000,000.00 0 41,500,735,149.00 PAK
06/11/2024 M124110002 CB PEMBELIAN UNIT POLLUX ADITAMA KENCANA 250,000,000.00 0 41,750,735,149.00 PAK
12/11/2024 M124110004 CB PEMBELIAN APARTEMEN POLLUX ADITAMA KENCANA 7,500,000.00 0 41,758,235,149.00 PAK
14/11/2024 M124110006 CB PEMBELIAN APARTEMEN POLLUX ADITAMA KENCANA 177,500,000.00 0 41,935,735,149.00 PAK
29/11/2024 M124110008 CB PEMBELIAN UNIT POLLUX ADITAMA KENCANA 145,312,633.00 0 42,081,047,782.00 PAK
29/11/2024 M124110008 CB PEMBELIAN UNIT POLLUX ADITAMA KENCANA 250,000,000.00 0 42,331,047,782.00 PAK
24/05/2024 M124050010 CB UANG MUKA PEMBELIAN UNIT PT. POLLUX BARELANG 200,000,000.00 0 42,531,047,782.00 BARELANG
19/06/2024 M124060002 CB PEMBAYARAN CICILAN APARTEMEN POLLUX BARELANG 180,000,000.00 0 42,711,047,782.00 BARELANG
21/07/2024 M124070005 CB UANG MUKA PEMBELIAN UNIT PT. POLLUX BARELANG MEGASUPERBLOK 720,000,000.00 0 43,431,047,782.00 BARELANG
31/12/2024 JM24120014 GL AUD ADJ 24 / Reclass General & Administration - Professional Fee - Legal Fee & Notary (H100-0801-0000) => Advance
809,490,000.00
Payment - Others (A106-0204-0000) /0Biaya Perijinan
44,240,537,782.00 LEGAL
/ karena belum selesai FEE
pekerjaannya
58,010,026,103.00 13,769,488,321.00 44,240,537,782.00
PAK 42,331,047,782.00
BARELANG 1,100,000,000.00
809,490,000.00
44,240,537,782.00 44854857815 - 614,320,033.00
Page 5
CHADSTONE
TOWER A
NO Tower Floor Type UNIT View SQM Nett NO. SERTI NOP HARGA INVESTASI NJOP NILAI AJB PPN 11% AJB PPh 2.5% BPHTB 5% TOTAL HJB REIMBURSE FIT OUT Nilai Roya New KETERANGAN KETERANGAN
1 A FLOOR 06 3BR A#C06-11 City 56 45.81 4432 32.18.022.007.013-0270 796,971,280 93,726,000 94,000,000 10,340,000 2,350,000 4,700,000 111,390,000 685,581,280 600,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 1
2 A FLOOR 07 2BR A#B07-06 Pool 42 30.53 4046 32.18.022.007.013-0285 597,728,460 63,879,000 64,000,000 7,040,000 1,600,000 3,200,000 75,840,000 521,888,460 450,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 1
3 A FLOOR 07 2BR A#B07-16 City 42 33.27 4054 32.18.022.007.013-0293 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 450,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 1
4 A FLOOR 07 3BR A#C07-01 Pool 56 44.97 4042 32.18.022.007.013-0281 796,971,280 91,893,000 92,000,000 10,120,000 2,300,000 4,600,000 109,020,000 687,951,280 600,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 1
5 A FLOOR 07 3BR A#C07-23 Golf 56 43.97 4061 32.18.022.007.013-0300 796,971,280 90,060,000 91,000,000 10,010,000 2,275,000 4,550,000 107,835,000 689,136,280 600,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 1
6 A FLOOR 08 2BR A#B08-16 City 42 33.27 3896 32.18.022.007.013-0313 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 450,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 1
7 A FLOOR 08 3BR A#C08-11 City 56 45.81 3893 32.18.022.007.013-0310 796,971,280 93,726,000 94,000,000 10,340,000 2,350,000 4,700,000 111,390,000 685,581,280 600,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 1
8 A FLOOR 10 3BR A#C10-01 Pool 56 44.97 4191 32.18.022.007.013-0341 796,971,280 91,893,000 92,000,000 10,120,000 2,300,000 4,600,000 109,020,000 687,951,280 600,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 1
9 A FLOOR 10 3BR A#C10-10 Pool 56 45.63 4212 32.18.022.007.013-0349 796,971,280 93,726,000 94,000,000 10,340,000 2,350,000 4,700,000 111,390,000 685,581,280 600,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 1
10 A FLOOR 10 3BR A#C10-11 City 56 45.81 4213 32.18.022.007.013-0350 796,971,280 93,726,000 94,000,000 10,340,000 2,350,000 4,700,000 111,390,000 685,581,280 600,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 1
11 A FLOOR 11 3BR A#C11-11 City 56 45.81 1867 32.18.022.007.013-0370 796,971,280 93,726,000 94,000,000 10,340,000 2,350,000 4,700,000 111,390,000 685,581,280 600,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 1
12 A FLOOR 12 3BR A#C12-11 City 56 45.81 2032 32.18.022.007.013-0390 796,971,280 93,726,000 94,000,000 10,340,000 2,350,000 4,700,000 111,390,000 685,581,280 600,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 1
13 A FLOOR 16 2BR A#B16-06 Pool 42 30.53 3540 32.18.022.007.013-0425 597,728,460 63,879,000 64,000,000 7,040,000 1,600,000 3,200,000 75,840,000 521,888,460 450,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 1
14 A FLOOR 17 2BR A#B17-07 Pool 42 33.19 3633 32.18.022.007.013-0446 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 450,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 1
15 A FLOOR 17 2BR A#B17-15 City 42 32.21 3639 32.18.022.007.013-0452 597,728,460 65,712,000 66,000,000 7,260,000 1,650,000 3,300,000 78,210,000 519,518,460 450,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 1
16 A FLOOR 17 2BR A#B17-20 Golf 42 33.27 3644 32.18.022.007.013-0457 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 450,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 1
17 A FLOOR 17 3BR A#C17-01 Pool 56 44.97 3628 32.18.022.007.013-0441 796,971,280 91,893,000 92,000,000 10,120,000 2,300,000 4,600,000 109,020,000 687,951,280 600,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 1
18 A FLOOR 17 3BR A#C17-10 Pool 56 45.63 3636 32.18.022.007.013-0449 796,971,280 93,726,000 94,000,000 10,340,000 2,350,000 4,700,000 111,390,000 685,581,280 600,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 1
19 A FLOOR 17 3BR A#C17-11 City 56 45.81 3637 32.18.022.007.013-0450 796,971,280 93,726,000 94,000,000 10,340,000 2,350,000 4,700,000 111,390,000 685,581,280 600,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 1
20 A FLOOR 18 2BR A#B18-06 Pool 42 30.53 4857 32.18.022.007.013-0465 597,728,460 63,879,000 64,000,000 7,040,000 1,600,000 3,200,000 75,840,000 521,888,460 450,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 1
21 A FLOOR 18 2BR A#B18-07 Pool 42 33.19 4858 32.18.022.007.013-0466 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 450,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 1
22 A FLOOR 18 2BR A#B18-15 City 42 32.21 4486 32.18.022.007.013-0472 597,728,460 65,712,000 66,000,000 7,260,000 1,650,000 3,300,000 78,210,000 519,518,460 450,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 1
23 A FLOOR 18 2BR A#B18-16 City 42 33.27 4487 32.18.022.007.013-0473 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 450,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 1
24 A FLOOR 18 2BR A#B18-19 Golf 42 33.43 4490 32.18.022.007.013-0476 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 450,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 1
25 A FLOOR 18 2BR A#B18-20 Golf 42 33.27 4491 32.18.022.007.013-0477 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 450,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 1
26 A FLOOR 18 3BR A#C18-01 Pool 56 44.97 4847 32.18.022.007.013-0461 796,971,280 91,893,000 92,000,000 10,120,000 2,300,000 4,600,000 109,020,000 687,951,280 600,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 1
27 A FLOOR 18 3BR A#C18-10 Pool 56 45.63 4483 32.18.022.007.013-0469 796,971,280 93,726,000 94,000,000 10,340,000 2,350,000 4,700,000 111,390,000 685,581,280 600,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 1
28 A FLOOR 18 3BR A#C18-11 City 56 45.81 4484 32.18.022.007.013-0470 796,971,280 93,726,000 94,000,000 10,340,000 2,350,000 4,700,000 111,390,000 685,581,280 600,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 1
29 A FLOOR 18 3BR A#C18-23 Golf 56 43.97 4517 32.18.022.007.013-0480 796,971,280 90,060,000 91,000,000 10,010,000 2,275,000 4,550,000 107,835,000 689,136,280 600,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 1
30 A FLOOR 19 2BR A#B19-06 Pool 42 30.53 2203 32.18.022.007.013-0485 597,728,460 63,879,000 64,000,000 7,040,000 1,600,000 3,200,000 75,840,000 521,888,460 450,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 1
31 A FLOOR 19 2BR A#B19-07 Pool 42 33.19 2204 32.18.022.007.013-0486 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 450,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 1
32 A FLOOR 19 2BR A#B19-16 City 42 33.27 2231 32.18.022.007.013-0493 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 450,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 1
33 A FLOOR 19 2BR A#B19-20 Golf 42 33.27 2235 32.18.022.007.013-0497 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 450,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 1
34 A FLOOR 19 3BR A#C19-01 Pool 56 44.97 2199 32.18.022.007.013-0481 796,971,280 91,893,000 92,000,000 10,120,000 2,300,000 4,600,000 109,020,000 687,951,280 600,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 1
35 A FLOOR 19 3BR A#C19-23 Golf 56 43.97 2238 32.18.022.007.013-0500 796,971,280 90,060,000 91,000,000 10,010,000 2,275,000 4,550,000 107,835,000 689,136,280 600,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 1
36 A FLOOR 20 3BR A#C20-01 Pool 56 44.97 2182 32.18.022.007.013-0501 796,971,280 91,893,000 92,000,000 10,120,000 2,300,000 4,600,000 109,020,000 687,951,280 600,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 1
37 A FLOOR 20 3BR A#C20-23 Golf 56 43.97 2244 32.18.022.007.013-0520 796,971,280 90,060,000 91,000,000 10,010,000 2,275,000 4,550,000 107,835,000 689,136,280 600,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 1
38 A FLOOR 22 1BR A#A22-21 Golf 25 19.87 3490 32.18.022.007.013-0558 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 295,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 1
39 A FLOOR 22 2BR A#B22-15 City 42 32.21 3484 32.18.022.007.013-0552 597,728,460 65,712,000 66,000,000 7,260,000 1,650,000 3,300,000 78,210,000 519,518,460 450,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 1
40 A FLOOR 22 3BR A#C22-11 City 56 45.81 3482 32.18.022.007.013-0550 796,971,280 93,726,000 94,000,000 10,340,000 2,350,000 4,700,000 111,390,000 685,581,280 600,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 1
41 A FLOOR 23 2BR A#B23-06 Pool 42 30.53 1843 32.18.022.007.013-0565 597,728,460 63,879,000 64,000,000 7,040,000 1,600,000 3,200,000 75,840,000 521,888,460 450,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 1
42 A FLOOR 23 3BR A#C23-01 Pool 56 44.97 1839 32.18.022.007.013-0561 796,971,280 91,893,000 92,000,000 10,120,000 2,300,000 4,600,000 109,020,000 687,951,280 600,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 1
43 A FLOOR 23 3BR A#C23-10 Pool 56 45.63 1856 32.18.022.007.013-0569 796,971,280 93,726,000 94,000,000 10,340,000 2,350,000 4,700,000 111,390,000 685,581,280 600,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 1
44 A FLOOR 23 3BR A#C23-11 City 56 45.81 1857 32.18.022.007.013-0570 796,971,280 93,726,000 94,000,000 10,340,000 2,350,000 4,700,000 111,390,000 685,581,280 600,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 1
45 A FLOOR 23 3BR A#C23-23 Golf 56 43.97 1880 32.18.022.007.013-0580 796,971,280 90,060,000 91,000,000 10,010,000 2,275,000 4,550,000 107,835,000 689,136,280 600,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 1
46 A FLOOR 25 2BR A#B25-15 City 42 32.21 1705 32.18.022.007.013-0592 597,728,460 65,712,000 66,000,000 7,260,000 1,650,000 3,300,000 78,210,000 519,518,460 450,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 1
47 A FLOOR 25 2BR A#B25-19 Golf 42 33.43 1717 32.18.022.007.013-0596 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 450,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 1
48 A FLOOR 25 3BR A#C25-11 City 56 45.81 1703 32.18.022.007.013-0590 796,971,280 93,726,000 94,000,000 10,340,000 2,350,000 4,700,000 111,390,000 685,581,280 600,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 1
49 A FLOOR 26 1BR A#A26-12 City 25 19.47 1545 32.18.022.007.013-0611 355,790,750 46,504,000 47,000,000 5,170,000 1,175,000 2,350,000 55,695,000 300,095,750 295,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 1
50 A FLOOR 26 3BR A#C26-23 Golf 56 43.97 1554 32.18.022.007.013-0620 796,971,280 90,060,000 91,000,000 10,010,000 2,275,000 4,550,000 107,835,000 689,136,280 600,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 1
51 A FLOOR 27 3BR A#C27-11 City 56 45.81 1415 32.18.022.007.013-0630 796,971,280 93,726,000 94,000,000 10,340,000 2,350,000 4,700,000 111,390,000 685,581,280 600,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 1
52 A FLOOR 28 2BR A#B28-16 City 42 33.27 1277 32.18.022.007.013-0653 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 450,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 1
53 A FLOOR 28 2BR A#B28-19 Golf 42 33.43 1280 32.18.022.007.013-0656 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 450,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 1
54 A FLOOR 28 3BR A#C28-01 Pool 56 44.97 1265 32.18.022.007.013-0641 796,971,280 91,893,000 92,000,000 10,120,000 2,300,000 4,600,000 109,020,000 687,951,280 600,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 1
55 A FLOOR 28 3BR A#C28-10 Pool 56 45.63 1273 32.18.022.007.013-0649 796,971,280 93,726,000 94,000,000 10,340,000 2,350,000 4,700,000 111,390,000 685,581,280 600,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 1
56 A FLOOR 28 3BR A#C28-11 City 56 45.81 1274 32.18.022.007.013-0650 796,971,280 93,726,000 94,000,000 10,340,000 2,350,000 4,700,000 111,390,000 685,581,280 600,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 1
57 A FLOOR 28 3BR A#C28-23 Golf 56 43.97 1284 32.18.022.007.013-0660 796,971,280 90,060,000 91,000,000 10,010,000 2,275,000 4,550,000 107,835,000 689,136,280 600,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 1
58 A FLOOR 30 2BR A#B30-15 City 42 32.21 3102 32.18.022.007.013-0692 597,728,460 65,712,000 66,000,000 7,260,000 1,650,000 3,300,000 78,210,000 519,518,460 450,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 1
59 A FLOOR 30 3BR A#C30-01 Pool 56 44.97 3091 32.18.022.007.013-0681 796,971,280 91,893,000 92,000,000 10,120,000 2,300,000 4,600,000 109,020,000 687,951,280 600,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 1
60 A FLOOR 30 3BR A#C30-10 Pool 56 45.63 3099 32.18.022.007.013-0689 796,971,280 93,726,000 94,000,000 10,340,000 2,350,000 4,700,000 111,390,000 685,581,280 600,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 1
61 A FLOOR 30 3BR A#C30-11 City 56 45.81 3100 32.18.022.007.013-0690 796,971,280 93,726,000 94,000,000 10,340,000 2,350,000 4,700,000 111,390,000 685,581,280 600,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 1
62 A FLOOR 31 2BR A#B31-06 Pool 42 30.53 1062 32.18.022.007.013-0705 597,728,460 63,879,000 64,000,000 7,040,000 1,600,000 3,200,000 75,840,000 521,888,460 450,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 1
63 A FLOOR 31 2BR A#B31-15 City 42 32.21 1073 32.18.022.007.013-0712 597,728,460 65,712,000 66,000,000 7,260,000 1,650,000 3,300,000 78,210,000 519,518,460 450,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 1
64 A FLOOR 31 2BR A#B31-16 City 42 33.27 1074 32.18.022.007.013-0713 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 450,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 1
65 A FLOOR 31 3BR A#C31-01 Pool 56 44.97 1079 32.18.022.007.013-0701 796,971,280 91,893,000 92,000,000 10,120,000 2,300,000 4,600,000 109,020,000 687,951,280 600,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 1
66 A FLOOR 31 3BR A#C31-10 Pool 56 45.63 1067 32.18.022.007.013-0709 796,971,280 93,726,000 94,000,000 10,340,000 2,350,000 4,700,000 111,390,000 685,581,280 600,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
67 A FLOOR 31 3BR A#C31-11 City 56 45.81 1068 32.18.022.007.013-0710 796,971,280 93,726,000 94,000,000 10,340,000 2,350,000 4,700,000 111,390,000 685,581,280 600,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
68 A FLOOR 31 3BR A#C31-23 Golf 56 43.97 4879 32.18.022.007.013-0720 796,971,280 90,060,000 91,000,000 10,010,000 2,275,000 4,550,000 107,835,000 689,136,280 600,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
69 A FLOOR 32 2BR A#B32-06 Pool 42 30.53 4563 32.18.022.007.013-0725 597,728,460 63,879,000 64,000,000 7,040,000 1,600,000 3,200,000 75,840,000 521,888,460 450,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
70 A FLOOR 32 2BR A#B32-15 City 42 32.21 4583 32.18.022.007.013-0732 597,728,460 65,712,000 66,000,000 7,260,000 1,650,000 3,300,000 78,210,000 519,518,460 450,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
71 A FLOOR 32 2BR A#B32-16 City 42 33.27 4584 32.18.022.007.013-0733 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 450,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
72 A FLOOR 32 3BR A#C32-01 Pool 56 44.97 4559 32.18.022.007.013-0721 796,971,280 91,893,000 92,000,000 10,120,000 2,300,000 4,600,000 109,020,000 687,951,280 600,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
73 A FLOOR 32 3BR A#C32-10 Pool 56 45.63 4567 32.18.022.007.013-0729 796,971,280 93,726,000 94,000,000 10,340,000 2,350,000 4,700,000 111,390,000 685,581,280 600,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
74 A FLOOR 32 3BR A#C32-11 City 56 45.81 4568 32.18.022.007.013-0730 796,971,280 93,726,000 94,000,000 10,340,000 2,350,000 4,700,000 111,390,000 685,581,280 600,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
75 A FLOOR 33 2BR A#B33-15 City 42 32.21 2656 32.18.022.007.013-0752 597,728,460 65,712,000 66,000,000 7,260,000 1,650,000 3,300,000 78,210,000 519,518,460 450,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
76 A FLOOR 33 3BR A#C33-01 Pool 56 44.97 2645 32.18.022.007.013-0741 796,971,280 91,893,000 92,000,000 10,120,000 2,300,000 4,600,000 109,020,000 687,951,280 600,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
77 A FLOOR 33 3BR A#C33-10 Pool 56 45.63 2653 32.18.022.007.013-0749 796,971,280 93,726,000 94,000,000 10,340,000 2,350,000 4,700,000 111,390,000 685,581,280 600,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
78 A FLOOR 33 3BR A#C33-11 City 56 45.81 2654 32.18.022.007.013-0750 796,971,280 93,726,000 94,000,000 10,340,000 2,350,000 4,700,000 111,390,000 685,581,280 600,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
79 A FLOOR 35 2BR A#B35-07 Pool 42 33.19 1776 32.18.022.007.013-0766 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 450,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
80 A FLOOR 35 2BR A#B35-16 City 42 33.27 1772 32.18.022.007.013-0773 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 450,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
81 A FLOOR 35 3BR A#C35-01 Pool 56 44.97 1765 32.18.022.007.013-0761 796,971,280 91,893,000 92,000,000 10,120,000 2,300,000 4,600,000 109,020,000 687,951,280 600,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
82 A FLOOR 35 3BR A#C35-10 Pool 56 45.63 1769 32.18.022.007.013-0769 796,971,280 93,726,000 94,000,000 10,340,000 2,350,000 4,700,000 111,390,000 685,581,280 600,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
83 A FLOOR 35 3BR A#C35-11 City 56 45.81 1768 32.18.022.007.013-0770 796,971,280 93,726,000 94,000,000 10,340,000 2,350,000 4,700,000 111,390,000 685,581,280 600,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
84 A FLOOR 38 1BR A#A38-09 Pool 25 19.72 3168 32.18.022.007.013-0828 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 295,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
85 A FLOOR 51 1BR A#A51-03 Pool 25 20.18 4786 32.18.022.007.013-0883 355,790,750 50,904,000 51,000,000 5,610,000 1,275,000 2,550,000 60,435,000 295,355,750 295,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
86 A FLOOR 51 1BR A#A51-05 Pool 25 18.81 4787 32.18.022.007.013-0884 355,790,750 46,504,000 47,000,000 5,170,000 1,175,000 2,350,000 55,695,000 300,095,750 295,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
TAHAP 2
1 A FLOOR 36 3BR A#C36-01 Pool 56 44.97 3176 32.18.022.007.013-0781 796,971,280 91,893,000 92,000,000 10,120,000 2,300,000 4,600,000 109,020,000 687,951,280 600,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
2 A FLOOR 36 3BR A#C36-10 Pool 56 45.63 3197 32.18.022.007.013-0789 796,971,280 93,726,000 94,000,000 10,340,000 2,350,000 4,700,000 111,390,000 685,581,280 600,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
3 A FLOOR 36 3BR A#C36-11 City 56 45.81 3198 32.18.022.007.013-0790 796,971,280 93,726,000 94,000,000 10,340,000 2,350,000 4,700,000 111,390,000 685,581,280 600,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
4 A FLOOR 36 3BR A#C36-23 Golf 56 43.97 3221 32.18.022.007.013-0800 796,971,280 90,060,000 91,000,000 10,010,000 2,275,000 4,550,000 107,835,000 689,136,280 600,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
5 A FLOOR 37 2BR A#B37-06 Pool 42 30.53 3349 32.18.022.007.013-0805 597,728,460 63,879,000 64,000,000 7,040,000 1,600,000 3,200,000 75,840,000 521,888,460 450,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
6 A FLOOR 37 2BR A#B37-07 Pool 42 33.19 3350 32.18.022.007.013-0806 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 450,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
7 A FLOOR 37 2BR A#B37-19 Golf 42 33.43 3360 32.18.022.007.013-0816 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 450,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
8 A FLOOR 37 3BR A#C37-01 Pool 56 44.97 3345 32.18.022.007.013-0801 796,971,280 91,893,000 92,000,000 10,120,000 2,300,000 4,600,000 109,020,000 687,951,280 600,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
9 A FLOOR 37 3BR A#C37-10 Pool 56 45.63 3353 32.18.022.007.013-0809 796,971,280 93,726,000 94,000,000 10,340,000 2,350,000 4,700,000 111,390,000 685,581,280 600,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
10 A FLOOR 37 3BR A#C37-11 City 56 45.81 3354 32.18.022.007.013-0810 796,971,280 93,726,000 94,000,000 10,340,000 2,350,000 4,700,000 111,390,000 685,581,280 600,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
11 A FLOOR 38 2BR A#B38-06 Pool 42 30.53 3165 32.18.022.007.013-0825 597,728,460 63,879,000 64,000,000 7,040,000 1,600,000 3,200,000 75,840,000 521,888,460 450,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
12 A FLOOR 38 2BR A#B38-07 Pool 42 33.19 3166 32.18.022.007.013-0826 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 450,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
13 A FLOOR 38 2BR A#B38-15 City 42 32.21 3172 32.18.022.007.013-0832 597,728,460 65,712,000 66,000,000 7,260,000 1,650,000 3,300,000 78,210,000 519,518,460 450,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
14 A FLOOR 38 2BR A#B38-16 City 42 33.27 3173 32.18.022.007.013-0833 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 450,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
15 A FLOOR 38 2BR A#B38-19 Golf 42 33.43 3180 32.18.022.007.013-0836 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 450,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
16 A FLOOR 38 3BR A#C38-01 Pool 56 44.97 3161 32.18.022.007.013-0821 796,971,280 91,893,000 92,000,000 10,120,000 2,300,000 4,600,000 109,020,000 687,951,280 600,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
17 A FLOOR 38 3BR A#C38-10 Pool 56 45.63 3169 32.18.022.007.013-0829 796,971,280 93,726,000 94,000,000 10,340,000 2,350,000 4,700,000 111,390,000 685,581,280 600,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
18 A FLOOR 38 3BR A#C38-11 City 56 45.81 3170 32.18.022.007.013-0830 796,971,280 93,726,000 94,000,000 10,340,000 2,350,000 4,700,000 111,390,000 685,581,280 600,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
19 A FLOOR 39 1BR A#A39-18 City 25 20.48 1197 32.18.022.007.013-0855 355,790,750 50,904,000 51,000,000 5,610,000 1,275,000 2,550,000 60,435,000 295,355,750 295,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
20 A FLOOR 39 2BR A#B39-16 City 42 33.27 1195 32.18.022.007.013-0853 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 450,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
21 A FLOOR 39 3BR A#C39-01 Pool 56 44.97 1183 32.18.022.007.013-0841 796,971,280 91,893,000 92,000,000 10,120,000 2,300,000 4,600,000 109,020,000 687,951,280 600,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
22 A FLOOR 39 3BR A#C39-10 Pool 56 45.63 1191 32.18.022.007.013-0849 796,971,280 93,726,000 94,000,000 10,340,000 2,350,000 4,700,000 111,390,000 685,581,280 600,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
23 A FLOOR 39 3BR A#C39-11 City 56 45.81 1192 32.18.022.007.013-0850 796,971,280 93,726,000 94,000,000 10,340,000 2,350,000 4,700,000 111,390,000 685,581,280 600,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
24 A FLOOR 39 3BR A#C39-23 Golf 56 43.97 1202 32.18.022.007.013-0860 796,971,280 90,060,000 91,000,000 10,010,000 2,275,000 4,550,000 107,835,000 689,136,280 600,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
25 A FLOOR 50 2BR A#B50-07 Pool 42 33.19 4909 32.18.022.007.013-0866 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 450,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
26 A FLOOR 50 2BR A#B50-16 City 42 33.27 4899 32.18.022.007.013-0873 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 450,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
27 A FLOOR 50 2BR A#B50-20 Golf 42 33.27 4906 32.18.022.007.013-0877 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 450,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
28 A FLOOR 50 3BR A#C50-01 Pool 56 44.97 1069 32.18.022.007.013-0861 796,971,280 91,893,000 92,000,000 10,120,000 2,300,000 4,600,000 109,020,000 687,951,280 600,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
29 A FLOOR 50 3BR A#C50-10 Pool 56 45.63 4895 32.18.022.007.013-0869 796,971,280 93,726,000 94,000,000 10,340,000 2,350,000 4,700,000 111,390,000 685,581,280 600,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
30 A FLOOR 50 3BR A#C50-11 City 56 45.81 4896 32.18.022.007.013-0870 796,971,280 93,726,000 94,000,000 10,340,000 2,350,000 4,700,000 111,390,000 685,581,280 600,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
31 A FLOOR 50 3BR A#C50-23 Golf 56 43.97 4902 32.18.022.007.013-0880 796,971,280 90,060,000 91,000,000 10,010,000 2,275,000 4,550,000 107,835,000 689,136,280 600,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
32 A FLOOR 51 1BR A#A51-08 Pool 25 19.76 4790 32.18.022.007.013-0887 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 295,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
33 A FLOOR 51 3BR A#C51-01 Pool 56 44.97 4784 32.18.022.007.013-0881 796,971,280 91,893,000 92,000,000 10,120,000 2,300,000 4,600,000 109,020,000 687,951,280 600,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
34 A FLOOR 51 3BR A#C51-10 Pool 56 45.63 4333 32.18.022.007.013-0889 796,971,280 93,726,000 94,000,000 10,340,000 2,350,000 4,700,000 111,390,000 685,581,280 600,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
35 A FLOOR 51 3BR A#C51-11 City 56 45.81 4334 32.18.022.007.013-0890 796,971,280 93,726,000 94,000,000 10,340,000 2,350,000 4,700,000 111,390,000 685,581,280 600,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
36 A FLOOR 51 3BR A#C51-23 Golf 56 43.97 4344 32.18.022.007.013-0900 796,971,280 90,060,000 91,000,000 10,010,000 2,275,000 4,550,000 107,835,000 689,136,280 600,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
37 A FLOOR 52 1BR A#A52-02 Pool 25 19.80 3774 32.18.022.007.013-0902 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 295,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
38 A FLOOR 52 1BR A#A52-22 Golf 25 20.06 3791 32.18.022.007.013-0919 355,790,750 50,904,000 51,000,000 5,610,000 1,275,000 2,550,000 60,435,000 295,355,750 295,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
39 A FLOOR 52 2BR A#B52-15 City 42 32.21 3784 32.18.022.007.013-0912 669,726,288 65,712,000 66,000,000 7,260,000 1,650,000 3,300,000 78,210,000 591,516,288 450,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
40 A FLOOR 52 2BR A#B52-16 City 42 33.27 3785 32.18.022.007.013-0913 669,726,288 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 589,146,288 450,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
41 A FLOOR 52 2BR A#B52-19 Golf 42 33.43 3788 32.18.022.007.013-0916 669,726,288 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 589,146,288 450,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
42 A FLOOR 52 2BR A#B52-20 Golf 42 33.27 3789 32.18.022.007.013-0917 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 450,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
43 A FLOOR 52 3BR A#C52-01 Pool 56 44.97 3773 32.18.022.007.013-0901 796,971,280 91,893,000 92,000,000 10,120,000 2,300,000 4,600,000 109,020,000 687,951,280
Page 6
76 A FLOOR 56 2BR A#B56-07 Pool 42 33.19 2443 32.18.022.007.013-0966 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 450,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
77 A FLOOR 56 2BR A#B56-19 Golf 42 33.43 2453 32.18.022.007.013-0976 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 450,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
78 A FLOOR 56 3BR A#C56-01 Pool 56 44.97 2438 32.18.022.007.013-0961 796,971,280 91,893,000 92,000,000 10,120,000 2,300,000 4,600,000 109,020,000 687,951,280 600,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
79 A FLOOR 56 3BR A#C56-10 Pool 56 45.63 2446 32.18.022.007.013-0969 796,971,280 93,726,000 94,000,000 10,340,000 2,350,000 4,700,000 111,390,000 685,581,280 600,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
80 A FLOOR 57 1BR A#A57-02 Pool 25 19.80 2551 32.18.022.007.013-0982 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 295,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
81 A FLOOR 57 1BR A#A57-05 Pool 25 18.81 2553 32.18.022.007.013-0984 355,790,750 46,504,000 47,000,000 5,170,000 1,175,000 2,350,000 55,695,000 300,095,750 295,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
82 A FLOOR 57 2BR A#B57-06 Pool 42 30.53 2554 32.18.022.007.013-0985 597,728,460 63,879,000 64,000,000 7,040,000 1,600,000 3,200,000 75,840,000 521,888,460 450,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
83 A FLOOR 57 2BR A#B57-07 Pool 42 33.19 2555 32.18.022.007.013-0986 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 450,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
84 A FLOOR 58 1BR A#A58-02 Pool 25 19.80 2908 32.18.022.007.013-1002 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 295,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
85 A FLOOR 58 1BR A#A58-08 Pool 25 19.76 2922 32.18.022.007.013-1007 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 295,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
86 A FLOOR 58 1BR A#A58-18 City 25 20.48 2930 32.18.022.007.013-1015 355,790,750 50,904,000 51,000,000 5,610,000 1,275,000 2,550,000 60,435,000 295,355,750 295,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
87 A FLOOR 58 2BR A#B58-06 Pool 42 30.53 2911 32.18.022.007.013-1005 597,728,460 63,879,000 64,000,000 7,040,000 1,600,000 3,200,000 75,840,000 521,888,460 450,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
88 A FLOOR 58 2BR A#B58-15 City 42 32.21 2927 32.18.022.007.013-1012 597,728,460 65,712,000 66,000,000 7,260,000 1,650,000 3,300,000 78,210,000 519,518,460 450,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
89 A FLOOR 58 2BR A#B58-16 City 42 33.27 2928 32.18.022.007.013-1013 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 450,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
90 HGB 5700 1094 1,094.00 05700/Pasirsari 3,050,190,000 2,573,088,000 2,574,000,000 283,140,000 64,350,000 128,700,000 3,050,190,000 - PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
91 A#A19-03 25 20.18 2201 355,790,750 50,904,000 51,000,000 5,610,000 1,275,000 2,550,000 60,435,000 295,355,750 450,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
92 A#A19-18 25 20.48 2233 355,790,750 50,904,000 51,000,000 5,610,000 1,275,000 2,550,000 60,435,000 295,355,750 450,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
93 A#A22-18 25 20.48 3487 355,790,750 50,904,000 51,000,000 5,610,000 1,275,000 2,550,000 60,435,000 295,355,750 450,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
94 A#A53-03 25 20.18 3878 355,790,750 50,904,000 51,000,000 5,610,000 1,275,000 2,550,000 60,435,000 295,355,750 450,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
95 A#A53-08 25 19.76 3882 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 450,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
96 A#C56-11 56 45.81 2447 796,971,280 93,726,000 94,000,000 10,340,000 2,350,000 4,700,000 111,390,000 685,581,280 450,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
97 A#C57-01 56 44.97 2550 796,971,280 91,893,000 92,000,000 10,120,000 2,300,000 4,600,000 109,020,000 687,951,280 450,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
98 A#C57-10 56 45.63 2558 796,971,280 93,726,000 94,000,000 10,340,000 2,350,000 4,700,000 111,390,000 685,581,280 450,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
99 A#C57-11 56 45.81 2533 796,971,280 93,726,000 94,000,000 10,340,000 2,350,000 4,700,000 111,390,000 685,581,280 450,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
100 A#C58-01 56 44.97 2907 796,971,280 91,893,000 92,000,000 10,120,000 2,300,000 4,600,000 109,020,000 687,951,280 450,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
101 A#C58-10 56 45.63 2924 796,971,280 93,726,000 94,000,000 10,340,000 2,350,000 4,700,000 111,390,000 685,581,280 450,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
102 A#C58-11 56 45.81 2925 796,971,280 93,726,000 94,000,000 10,340,000 2,350,000 4,700,000 111,390,000 685,581,280 450,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
103 A#C58-23 56 43.97 2948 796,971,280 90,060,000 91,000,000 10,010,000 2,275,000 4,550,000 107,835,000 689,136,280 450,000,000 PT. SILIWANGI BIMANTARA PERDANA TAHAP 2
Grand Total 9,819 8,032.29 128,181,132,790 17,000,659,000 17,065,000,000 1,877,150,000 426,625,000 853,250,000 20,222,025,000 107,959,107,790 87,940,000,000
Laporan PAK ( Bu Erna/Irina) 8,032.29 17,000,659,000 17,065,000,000 426,625,000
DIFF - - - -
TAHAP 3 ( 2024)
No Tower Floor Type Unit Sqm NOP Harga Investasi NJOP 2024 HJB PPN 11% PPh 2.5% BPHTB 5% Total HJB REIMBURSE FIT OUT Keterangan
1 C FLOOR 08 1BR C#A08-28 25 31.18.022.007.013-2004 355,790,750 50,904,000 51,000,000 5,610,000 1,275,000 2,550,000 60,435,000 295,355,750 PT. SILIWANGI BIMANTARA PERDANA 27.03.2024 TAHAP 3-MEI 2024
2 C FLOOR 16 1BR C#A16-06 25 31.18.022.007.013-2129 355,790,750 46,504,000 47,000,000 5,170,000 1,175,000 2,350,000 55,695,000 300,095,750 PT. SILIWANGI BIMANTARA PERDANA 27.03.2024 TAHAP 3-MEI 2024
3 C FLOOR 18 1BR C#A18-21 25 31.18.022.007.013-2190 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. SILIWANGI BIMANTARA PERDANA 27.03.2024 TAHAP 3-MEI 2024
4 C FLOOR 50 1BR C#A50-12 25 31.18.022.007.013-2663 355,790,750 50,904,000 51,000,000 5,610,000 1,275,000 2,550,000 60,435,000 295,355,750 PT. SILIWANGI BIMANTARA PERDANA 27.03.2024 TAHAP 3-MEI 2024
5 C FLOOR 52 1BR C#A52-16 25 31.18.022.007.013-2713 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. SILIWANGI BIMANTARA PERDANA 27.03.2024 TAHAP 3-MEI 2024
6 C FLOOR 12 2BR C#B12-22 42 31.18.022.007.013-2095 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 PT. SILIWANGI BIMANTARA PERDANA 27.03.2024 TAHAP 3-MEI 2024
7 D FLOOR 06 1BR D#A06-09 25 32.18.022.007.013-2852 375,000,000 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 316,935,000 PT. SILIWANGI BIMANTARA PERDANA 27.03.2024 TAHAP 3-MEI 2024
8 D FLOOR 18 1BR D#A18-02 25 32.18.022.007.013-3086 375,000,000 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 316,935,000 PT. SILIWANGI BIMANTARA PERDANA 27.03.2024 TAHAP 3-MEI 2024
9 D FLOOR 19 1BR D#A19-15 25 32.18.022.007.013-3120 375,000,000 50,904,000 51,000,000 5,610,000 1,275,000 2,550,000 60,435,000 314,565,000 PT. SILIWANGI BIMANTARA PERDANA 27.03.2024 TAHAP 3-MEI 2024
10 D FLOOR 19 1BR D#A19-17 25 32.18.022.007.013-3122 375,000,000 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 316,935,000 PT. SILIWANGI BIMANTARA PERDANA 27.03.2024 TAHAP 3-MEI 2024
11 D FLOOR 25 1BR D#A25-11 25 32.18.022.007.013-3238 375,000,000 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 316,935,000 PT. SILIWANGI BIMANTARA PERDANA 27.03.2024 TAHAP 3-MEI 2024
12 D FLOOR 26 1BR D#A26-15 25 32.18.022.007.013-3264 375,000,000 50,904,000 51,000,000 5,610,000 1,275,000 2,550,000 60,435,000 314,565,000 PT. SILIWANGI BIMANTARA PERDANA 27.03.2024 TAHAP 3-MEI 2024
13 D FLOOR 26 1BR D#A26-16 25 32.18.022.007.013-3265 375,000,000 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 316,935,000 PT. SILIWANGI BIMANTARA PERDANA 27.03.2024 TAHAP 3-MEI 2024
14 D FLOOR 36 1BR D#A36-15 25 32.18.022.007.013-3480 375,000,000 50,904,000 51,000,000 5,610,000 1,275,000 2,550,000 60,435,000 314,565,000 PT. SILIWANGI BIMANTARA PERDANA 27.03.2024 TAHAP 3-MEI 2024
15 D FLOOR 50 1BR D#A50-01 25 32.18.022.007.013-3565 375,000,000 50,904,000 51,000,000 5,610,000 1,275,000 2,550,000 60,435,000 314,565,000 PT. SILIWANGI BIMANTARA PERDANA 27.03.2024 TAHAP 3-MEI 2024
16 D FLOOR 58 1BR D#A58-17 25 32.18.022.007.013-3746 375,000,000 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 316,935,000 PT. SILIWANGI BIMANTARA PERDANA 27.03.2024 TAHAP 3-MEI 2024
17 D FLOOR 21 2BR D#B21-22 42 32.18.022.007.013-3175 630,000,000 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 549,420,000 PT. SILIWANGI BIMANTARA PERDANA 27.03.2024 TAHAP 3-MEI 2024
18 D FLOOR 19 1BR D#A19-01 25 32.18.022.007.013-3109 375,000,000 50,904,000 51,000,000 5,610,000 1,275,000 2,550,000 60,435,000 314,565,000 PT. SILIWANGI BIMANTARA PERDANA 27.03.2024 TAHAP 3-MEI 2024
19 D FLOOR 30 1BR D#A30-11 25 32.18.022.007.013-3358 375,000,000 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 316,935,000 PT. SILIWANGI BIMANTARA PERDANA 27.03.2024 TAHAP 3-MEI 2024
20 D FLOOR 30 1BR D#A30-12 25 32.18.022.007.013-3359 375,000,000 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 316,935,000 PT. SILIWANGI BIMANTARA PERDANA 27.03.2024 TAHAP 3-MEI 2024
21 D FLOOR 31 1BR D#A31-06 25 32.18.022.007.013-3377 375,000,000 46,504,000 47,000,000 5,170,000 1,175,000 2,350,000 55,695,000 319,305,000 PT. SILIWANGI BIMANTARA PERDANA 27.03.2024 TAHAP 3-MEI 2024
22 D FLOOR 31 1BR D#A31-16 25 32.18.022.007.013-3385 375,000,000 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 316,935,000 PT. SILIWANGI BIMANTARA PERDANA 27.03.2024 TAHAP 3-MEI 2024
23 D FLOOR 35 1BR D#A35-05 25 32.18.022.007.013-3448 375,000,000 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 316,935,000 PT. SILIWANGI BIMANTARA PERDANA 27.03.2024 TAHAP 3-MEI 2024
24 D FLOOR 36 1BR D#A36-20 25 32.18.022.007.013-3485 375,000,000 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 316,935,000 PT. SILIWANGI BIMANTARA PERDANA 27.03.2024 TAHAP 3-MEI 2024
25 D FLOOR 39 1BR D#A39-11 25 32.18.022.007.013-3550 375,000,000 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 316,935,000 PT. SILIWANGI BIMANTARA PERDANA 27.03.2024 TAHAP 3-MEI 2024
26 D FLOOR 53 1BR D#A53-21 25 32.18.022.007.013-3654 375,000,000 50,904,000 51,000,000 5,610,000 1,275,000 2,550,000 60,435,000 314,565,000 PT. SILIWANGI BIMANTARA PERDANA 27.03.2024 TAHAP 3-MEI 2024
27 D FLOOR 19 1BR D#A19-12 25 32.18.022.007.013-3119 375,000,000 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 316,935,000 PT. SILIWANGI BIMANTARA PERDANA 27.03.2024 TAHAP 3-MEI 2024
28 D FLOOR 29 1BR D#A29-28 25 32.18.022.007.013-3348 375,000,000 50,904,000 51,000,000 5,610,000 1,275,000 2,550,000 60,435,000 314,565,000 PT. SILIWANGI BIMANTARA PERDANA 27.03.2024 TAHAP 3-MEI 2024
29 D FLOOR 30 1BR D#A30-25 25 32.18.022.007.013-3369 375,000,000 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 316,935,000 PT. SILIWANGI BIMANTARA PERDANA 27.03.2024 TAHAP 3-MEI 2024
30 D FLOOR 16 2BR D#B16-23 42 32.18.022.007.013-3056 630,000,000 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 549,420,000 PT. SILIWANGI BIMANTARA PERDANA 27.03.2024 TAHAP 3-MEI 2024
TOTAL 11,886,682,210 1,533,043,000 1,541,000,000 169,510,000 38,525,000 77,050,000 1,826,085,000 10,060,597,210 - -
SUMMARY ALL : - - -
TOWER SQM NAMA PT HARGA INVESTASI NJOP NILAI AJB PPN 11% AJB PPh 2.5% BPHTB 5% TOTAL HJB REIMBURSE FIT OUT
A 9,819 PT. SILIWANGI BIMANTARA PERDANA 140,067,815,000 18,533,702,000 18,606,000,000 2,046,660,000 465,150,000 930,300,000 22,048,110,000 118,019,705,000
B 23,443 PT. BUMI WARDANA 334,529,821,500 42,646,236,000 42,962,000,000 4,725,820,000 1,074,050,000 2,148,100,000 50,909,970,000 283,619,851,500
C 10,508 PT. SINO PROPERTINDO INTERNASIONAL 59,064,693,774 22,909,033,000 22,943,000,000 2,523,730,000 573,575,000 1,147,150,000 27,187,455,000 31,877,238,774
43,770 533,662,330,274 84,088,971,000 84,511,000,000 9,296,210,000 2,112,775,000 4,225,550,000 100,145,535,000 433,516,795,274
ALIRAN DANA 2023:
BTN 450,000,000,000
PT. SILIWANGI BIMANTARA PERDANA 45,960,968,287
PT. BUMI WARDANA 81,297,272,615
PT. SINO PROPERTINDO INTERNASIONAL 559,599,493
TOTAL PEMBAYARAN KE PAK 2023 577,817,840,395
UANG MUKA PPN PT BUMI WARDANA - 1,277,388
UANG MUKA PPN PT SILIWANGI BIMANTARA PERDANA - 3,875,364,773
TOTAL PEMBELIAN UNIT PAK sd Q2 2024 - 533,662,330,274
Setoran sd Q2 2024 PT Siliwangi Bimantara Perdana 487,138,729.00
Setoran sd Q2 2024 PT Bumi Wardana 4,088,851,126.00
LEBIH BAYAR JUNI 2024 44,854,857,815.00
LEBIH BAYAR PT SILIWANGI BIMANTARA PERDANA 41,363,735,149.00
LEBIH BAYAR PT BUMI WARDANA 3,491,122,666.00
Page 7
CHADSTONE
TOWER B
NO UNIT KODE SQM Nett NO. SERTI NOP HARGA INVESTASI NJOP NILAI AJB PPN 11% AJB PPh 2.5% BPHTB 5% TOTAL HJB REIMBURSE FIT OUT KETERANGAN KETERANGAN TAHAP
184 B#A27-15 B#27-15 25 20.53 1438 32.18.022.007.013-1464 355,790,750 50,904,000 51,000,000 5,610,000 1,275,000 2,550,000 60,435,000 295,355,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
190 B#A27-28 B#27-28 25 20.52 1357 32.18.022.007.013-1476 355,790,750 50,904,000 51,000,000 5,610,000 1,275,000 2,550,000 60,435,000 295,355,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
201 B#A28-11 B#28-11 25 20.04 1294 32.18.022.007.013-1486 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
202 B#A28-12 B#28-12 25 20.49 1295 32.18.022.007.013-1487 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
203 B#A28-16 B#28-16 25 20.15 1297 32.18.022.007.013-1489 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
204 B#A28-17 B#28-17 25 19.94 1298 32.18.022.007.013-1490 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
205 B#A28-20 B#28-20 25 19.76 1301 32.18.022.007.013-1493 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
206 B#A28-21 B#28-21 25 20.48 1302 32.18.022.007.013-1494 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
207 B#A28-25 B#28-25 25 19.71 1305 32.18.022.007.013-1497 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
208 B#A28-26 B#28-26 25 19.98 1306 32.18.022.007.013-1498 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
209 B#A28-27 B#28-27 25 19.30 1307 32.18.022.007.013-1499 355,790,750 46,504,000 47,000,000 5,170,000 1,175,000 2,350,000 55,695,000 300,095,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
210 B#A28-28 B#28-28 25 20.52 1308 32.18.022.007.013-1500 355,790,750 50,904,000 51,000,000 5,610,000 1,275,000 2,550,000 60,435,000 295,355,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
213 B#B28-18 B#28-18 42 32.09 1299 32.18.022.007.013-1491 597,728,460 65,714,000 66,000,000 7,260,000 1,650,000 3,300,000 78,210,000 519,518,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
216 B#B28-23 B#28-23 42 33.24 1304 32.18.022.007.013-1496 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
217 B#A29-01 B#29-01 25 20.54 2945 32.18.022.007.013-1501 355,790,750 50,904,000 51,000,000 5,610,000 1,275,000 2,550,000 60,435,000 295,355,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
218 B#A29-02 B#29-02 25 20.19 2946 32.18.022.007.013-1502 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
219 B#A29-03 B#29-03 25 20.19 2960 32.18.022.007.013-1503 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
220 B#A29-05 B#29-05 25 20.11 2961 32.18.022.007.013-1504 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
221 B#A29-06 B#29-06 25 18.85 2962 32.18.022.007.013-1505 355,790,750 46,504,000 47,000,000 5,170,000 1,175,000 2,350,000 55,695,000 300,095,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
222 B#A29-09 B#29-09 25 19.72 2965 32.18.022.007.013-1508 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
417 B#B38-23 B#38-23 42 33.24 3217 32.18.022.007.013-1712 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
418 B#A39-01 B#39-01 25 20.54 1203 32.18.022.007.013-1717 355,790,750 50,904,000 51,000,000 5,610,000 1,275,000 2,550,000 60,435,000 295,355,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
419 B#A39-02 B#39-02 25 20.19 1204 32.18.022.007.013-1718 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
420 B#A39-03 B#39-03 25 20.19 1205 32.18.022.007.013-1719 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
421 B#A39-05 B#39-05 25 20.11 1206 32.18.022.007.013-1720 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
422 B#A39-06 B#39-06 25 18.85 1207 32.18.022.007.013-1721 355,790,750 46,504,000 47,000,000 5,170,000 1,175,000 2,350,000 55,695,000 300,095,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
423 B#A39-09 B#39-09 25 19.72 1210 32.18.022.007.013-1724 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
424 B#A39-10 B#39-10 25 20.04 1211 32.18.022.007.013-1725 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
425 B#A39-11 B#39-11 25 20.04 1212 32.18.022.007.013-1726 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
426 B#A39-12 B#39-12 25 20.49 1213 32.18.022.007.013-1727 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
427 B#A39-15 B#39-15 25 20.53 1214 32.18.022.007.013-1728 355,790,750 50,904,000 51,000,000 5,610,000 1,275,000 2,550,000 60,435,000 295,355,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
428 B#A39-16 B#39-16 25 20.15 1215 32.18.022.007.013-1729 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
429 B#A39-17 B#39-17 25 19.94 1216 32.18.022.007.013-1730 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
430 B#A39-20 B#39-20 25 19.76 1219 32.18.022.007.013-1733 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
431 B#A39-21 B#39-21 25 20.48 1220 32.18.022.007.013-1734 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
432 B#A39-25 B#39-25 25 19.71 1223 32.18.022.007.013-1737 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
433 B#A39-26 B#39-26 25 19.98 1224 32.18.022.007.013-1738 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
434 B#A39-27 B#39-27 25 19.30 1225 32.18.022.007.013-1739 355,790,750 46,504,000 47,000,000 5,170,000 1,175,000 2,350,000 55,695,000 300,095,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
435 B#A39-28 B#39-28 25 20.52 1226 32.18.022.007.013-1740 355,790,750 50,904,000 51,000,000 5,610,000 1,275,000 2,550,000 60,435,000 295,355,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
436 B#B39-07 B#39-07 42 30.62 1208 32.18.022.007.013-1722 597,728,460 63,879,000 64,000,000 7,040,000 1,600,000 3,200,000 75,840,000 521,888,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
437 B#B39-08 B#39-08 42 33.17 1209 32.18.022.007.013-1723 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
438 B#B39-18 B#39-18 42 32.09 1217 32.18.022.007.013-1731 597,728,460 65,714,000 66,000,000 7,260,000 1,650,000 3,300,000 78,210,000 519,518,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
439 B#B39-19 B#39-19 42 33.16 1218 32.18.022.007.013-1732 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
440 B#B39-22 B#39-22 42 33.28 1221 32.18.022.007.013-1735 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
441 B#B39-23 B#39-23 42 33.24 1222 32.18.022.007.013-1736 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
442 B#A50-01 B#50-01 25 20.54 4886 32.18.022.007.013-1741 355,790,750 50,904,000 51,000,000 5,610,000 1,275,000 2,550,000 60,435,000 295,355,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
443 B#A50-02 B#50-02 25 20.19 4887 32.18.022.007.013-1742 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
444 B#A50-03 B#50-03 25 20.19 4888 32.18.022.007.013-1743 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
445 B#A50-05 B#50-05 25 20.11 4889 32.18.022.007.013-1744 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
446 B#A50-06 B#50-06 25 18.85 4890 32.18.022.007.013-1745 355,790,750 46,504,000 47,000,000 5,170,000 1,175,000 2,350,000 55,695,000 300,095,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
447 B#A50-09 B#50-09 25 19.72 4876 32.18.022.007.013-1748 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
448 B#A50-10 B#50-10 25 20.04 4875 32.18.022.007.013-1749 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
449 B#A50-11 B#50-11 25 20.04 4884 32.18.022.007.013-1750 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
450 B#A50-12 B#50-12 25 20.49 4885 32.18.022.007.013-1751 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
451 B#A50-15 B#50-15 25 20.53 4877 32.18.022.007.013-1752 355,790,750 50,904,000 51,000,000 5,610,000 1,275,000 2,550,000 60,435,000 295,355,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
452 B#A50-16 B#50-16 25 20.15 4878 32.18.022.007.013-1753 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
453 B#A50-17 B#50-17 25 19.94 4894 32.18.022.007.013-1754 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
454 B#A50-20 B#50-20 25 19.76 4835 32.18.022.007.013-1757 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
455 B#A50-21 B#50-21 25 20.48 4836 32.18.022.007.013-1758 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
456 B#A50-25 B#50-25 25 19.71 4839 32.18.022.007.013-1761 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
457 B#A50-26 B#50-26 25 19.98 4622 32.18.022.007.013-1762 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
458 B#A50-27 B#50-27 25 19.30 4623 32.18.022.007.013-1763 355,790,750 46,504,000 47,000,000 5,170,000 1,175,000 2,350,000 55,695,000 300,095,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
459 B#A50-28 B#50-28 25 20.52 4624 32.18.022.007.013-1764 355,790,750 50,904,000 51,000,000 5,610,000 1,275,000 2,550,000 60,435,000 295,355,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
460 B#B50-07 B#50-07 42 30.62 4882 32.18.022.007.013-1746 597,728,460 63,879,000 64,000,000 7,040,000 1,600,000 3,200,000 75,840,000 521,888,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
461 B#B50-08 B#50-08 42 33.17 4883 32.18.022.007.013-1747 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
462 B#B50-18 B#50-18 42 32.09 4892 32.18.022.007.013-1755 597,728,460 65,714,000 66,000,000 7,260,000 1,650,000 3,300,000 78,210,000 519,518,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
463 B#B50-19 B#50-19 42 33.16 4893 32.18.022.007.013-1756 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
464 B#B50-22 B#50-22 42 33.28 4837 32.18.022.007.013-1759 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
465 B#B50-23 B#50-23 42 33.24 4838 32.18.022.007.013-1760 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
466 B#A51-01 B#51-01 25 20.54 4371 32.18.022.007.013-1765 355,790,750 50,904,000 51,000,000 5,610,000 1,275,000 2,550,000 60,435,000 295,355,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
467 B#A51-02 B#51-02 25 20.19 4372 32.18.022.007.013-1766 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
468 B#A51-03 B#51-03 25 20.19 4373 32.18.022.007.013-1767 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
469 B#A51-05 B#51-05 25 20.11 4374 32.18.022.007.013-1768 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
470 B#A51-06 B#51-06 25 18.85 4375 32.18.022.007.013-1769 355,790,750 46,504,000 47,000,000 5,170,000 1,175,000 2,350,000 55,695,000 300,095,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
471 B#A51-09 B#51-09 25 19.72 4378 32.18.022.007.013-1772 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
472 B#A51-10 B#51-10 25 20.04 4379 32.18.022.007.013-1773 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
473 B#A51-11 B#51-11 25 20.04 4380 32.18.022.007.013-1774 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
474 B#A51-12 B#51-12 25 20.49 4381 32.18.022.007.013-1775 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
475 B#A51-15 B#51-15 25 20.53 4382 32.18.022.007.013-1776 355,790,750 50,904,000 51,000,000 5,610,000 1,275,000 2,550,000 60,435,000 295,355,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
476 B#A51-16 B#51-16 25 20.15 4383 32.18.022.007.013-1777 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
477 B#A51-17 B#51-17 25 19.94 4412 32.18.022.007.013-1778 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
478 B#A51-20 B#51-20 25 19.76 4452 32.18.022.007.013-1781 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
479 B#A51-21 B#51-21 25 20.48 4453 32.18.022.007.013-1782 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
480 B#A51-25 B#51-25 25 19.71 4456 32.18.022.007.013-1785 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
481 B#A51-26 B#51-26 25 19.98 4457 32.18.022.007.013-1786 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
482 B#A51-27 B#51-27 25 19.30 4458 32.18.022.007.013-1787 355,790,750 46,504,000 47,000,000 5,170,000 1,175,000 2,350,000 55,695,000 300,095,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
483 B#A51-28 B#51-28 25 20.52 4459 32.18.022.007.013-1788 355,790,750 50,904,000 51,000,000 5,610,000 1,275,000 2,550,000 60,435,000 295,355,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
484 B#B51-07 B#51-07 42 30.62 4376 32.18.022.007.013-1770 597,728,460 63,879,000 64,000,000 7,040,000 1,600,000 3,200,000 75,840,000 521,888,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
485 B#B51-08 B#51-08 42 33.17 4377 32.18.022.007.013-1771 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
486 B#B51-18 B#51-18 42 32.09 4450 32.18.022.007.013-1779 597,728,460 65,714,000 66,000,000 7,260,000 1,650,000 3,300,000 78,210,000 519,518,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
487 B#B51-19 B#51-19 42 33.16 4451 32.18.022.007.013-1780 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
488 B#B51-22 B#51-22 42 33.28 4454 32.18.022.007.013-1783 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
489 B#B51-23 B#51-23 42 33.24 4455 32.18.022.007.013-1784 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
490 B#A52-01 B#52-01 25 20.54 3793 32.18.022.007.013-1789 355,790,750 50,904,000 51,000,000 5,610,000 1,275,000 2,550,000 60,435,000 295,355,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
491 B#A52-02 B#52-02 25 20.19 3794 32.18.022.007.013-1790 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
492 B#A52-03 B#52-03 25 20.19 3795 32.18.022.007.013-1791 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
493 B#A52-05 B#52-05 25 20.11 3796 32.18.022.007.013-1792 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
494 B#A52-06 B#52-06 25 18.85 3797 32.18.022.007.013-1793 355,790,750 46,504,000 47,000,000 5,170,000 1,175,000 2,350,000 55,695,000 300,095,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
495 B#A52-09 B#52-09 25 19.72 3800 32.18.022.007.013-1796 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
496 B#A52-10 B#52-10 25 20.04 3801 32.18.022.007.013-1797 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
497 B#A52-11 B#52-11 25 20.04 3802 32.18.022.007.013-1798 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
498 B#A52-12 B#52-12 25 20.49 3803 32.18.022.007.013-1799 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
499 B#A52-15 B#52-15 25 20.53 3804 32.18.022.007.013-1800 355,790,750 50,904,000 51,000,000 5,610,000 1,275,000 2,550,000 60,435,000 295,355,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
500 B#A52-16 B#52-16 25 20.15 3805 32.18.022.007.013-1801 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
501 B#A52-17 B#52-17 25 19.94 3806 32.18.022.007.013-1802 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
502 B#A52-20 B#52-20 25 19.76 3809 32.18.022.007.013-1805 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
503 B#A52-21 B#52-21 25 20.48 3810 32.18.022.007.013-1806 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
504 B#A52-25 B#52-25 25 19.71 3813 32.18.022.007.013-1809 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
505 B#A52-26 B#52-26 25 19.98 3814 32.18.022.007.013-1810 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
506 B#A52-27 B#52-27 25 19.30 3815 32.18.022.007.013-1811 355,790,750 46,504,000 47,000,000 5,170,000 1,175,000 2,350,000 55,695,000 300,095,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
507 B#A52-28 B#52-28 25 20.52 3816 32.18.022.007.013-1812 355,790,750 50,904,000 51,000,000 5,610,000 1,275,000 2,550,000 60,435,000 295,355,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
508 B#B52-07 B#52-07 42 30.62 3798 32.18.022.007.013-1794 597,728,460 63,879,000 64,000,000 7,040,000 1,600,000 3,200,000 75,840,000 521,888,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
509 B#B52-08 B#52-08 42 33.17 3799 32.18.022.007.013-1795 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
510 B#B52-18 B#52-18 42 32.09 3807 32.18.022.007.013-1803 597,728,460 65,714,000 66,000,000 7,260,000 1,650,000 3,300,000 78,210,000 519,518,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
511 B#B52-19 B#52-19 42 33.16 3808 32.18.022.007.013-1804 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
512 B#B52-22 B#52-22 42 33.28 3811 32.18.022.007.013-1807 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
513 B#B52-23 B#52-23 42 33.24 3812 32.18.022.007.013-1808 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
514 B#A53-01 B#53-01 25 20.54 3909 32.18.022.007.013-1813 355,790,750 50,904,000 51,000,000 5,610,000 1,275,000 2,550,000 60,435,000 295,355,750
Page 8
555 B#A55-28 B#55-28 25 20.52 2376 32.18.022.007.013-1860 355,790,750 50,904,000 51,000,000 5,610,000 1,275,000 2,550,000 60,435,000 295,355,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 556 B#B55-07 B#55-07 42 30.62 2358 32.18.022.007.013-1842 597,728,460 63,879,000 64,000,000 7,040,000 1,600,000 3,200,000 75,840,000 521,888,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 557 B#B55-08 B#55-08 42 33.17 2359 32.18.022.007.013-1843 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 558 B#B55-18 B#55-18 42 32.09 2367 32.18.022.007.013-1851 597,728,460 65,714,000 66,000,000 7,260,000 1,650,000 3,300,000 78,210,000 519,518,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 559 B#B55-19 B#55-19 42 33.16 2368 32.18.022.007.013-1852 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 560 B#B55-22 B#55-22 42 33.28 2371 32.18.022.007.013-1855 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 561 B#B55-23 B#55-23 42 33.24 2372 32.18.022.007.013-1856 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 562 B#A56-01 B#56-01 25 20.54 2458 32.18.022.007.013-1861 355,790,750 50,904,000 51,000,000 5,610,000 1,275,000 2,550,000 60,435,000 295,355,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 563 B#A56-02 B#56-02 25 20.19 2459 32.18.022.007.013-1862 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 564 B#A56-03 B#56-03 25 20.19 2460 32.18.022.007.013-1863 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 565 B#A56-05 B#56-05 25 20.11 2461 32.18.022.007.013-1864 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 566 B#A56-06 B#56-06 25 18.85 2469 32.18.022.007.013-1865 355,790,750 46,504,000 47,000,000 5,170,000 1,175,000 2,350,000 55,695,000 300,095,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 567 B#A56-09 B#56-09 25 19.72 2472 32.18.022.007.013-1868 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 568 B#A56-10 B#56-10 25 20.04 2473 32.18.022.007.013-1869 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 569 B#A56-11 B#56-11 25 20.04 2474 32.18.022.007.013-1870 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 570 B#A56-12 B#56-12 25 20.49 2475 32.18.022.007.013-1871 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 571 B#A56-15 B#56-15 25 20.53 2476 32.18.022.007.013-1872 355,790,750 50,904,000 51,000,000 5,610,000 1,275,000 2,550,000 60,435,000 295,355,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 572 B#A56-16 B#56-16 25 20.15 2477 32.18.022.007.013-1873 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 573 B#A56-17 B#56-17 25 19.94 2478 32.18.022.007.013-1874 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 574 B#A56-20 B#56-20 25 19.76 2481 32.18.022.007.013-1877 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 575 B#A56-21 B#56-21 25 20.48 2482 32.18.022.007.013-1878 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 576 B#A56-25 B#56-25 25 19.71 2485 32.18.022.007.013-1881 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 577 B#A56-26 B#56-26 25 19.98 2486 32.18.022.007.013-1882 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 578 B#A56-27 B#56-27 25 19.30 2487 32.18.022.007.013-1883 355,790,750 46,504,000 47,000,000 5,170,000 1,175,000 2,350,000 55,695,000 300,095,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 579 B#A56-28 B#56-28 25 20.52 2488 32.18.022.007.013-1884 355,790,750 50,904,000 51,000,000 5,610,000 1,275,000 2,550,000 60,435,000 295,355,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 580 B#B56-07 B#56-07 42 30.62 2470 32.18.022.007.013-1866 597,728,460 63,879,000 64,000,000 7,040,000 1,600,000 3,200,000 75,840,000 521,888,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 581 B#B56-08 B#56-08 42 33.17 2471 32.18.022.007.013-1867 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 582 B#B56-18 B#56-18 42 32.09 2479 32.18.022.007.013-1875 597,728,460 65,714,000 66,000,000 7,260,000 1,650,000 3,300,000 78,210,000 519,518,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 583 B#B56-19 B#56-19 42 33.16 2480 32.18.022.007.013-1876 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 584 B#B56-22 B#56-22 42 33.28 2483 32.18.022.007.013-1879 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 585 B#B56-23 B#56-23 42 33.24 2484 32.18.022.007.013-1880 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 586 B#A57-01 B#57-01 25 20.54 2544 32.18.022.007.013-1885 355,790,750 50,904,000 51,000,000 5,610,000 1,275,000 2,550,000 60,435,000 295,355,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 587 B#A57-02 B#57-02 25 20.19 2545 32.18.022.007.013-1886 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 588 B#A57-03 B#57-03 25 20.19 2559 32.18.022.007.013-1887 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 589 B#A57-05 B#57-05 25 20.11 2560 32.18.022.007.013-1888 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 590 B#A57-06 B#57-06 25 18.85 2561 32.18.022.007.013-1889 355,790,750 46,504,000 47,000,000 5,170,000 1,175,000 2,350,000 55,695,000 300,095,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 591 B#A57-09 B#57-09 25 19.72 2564 32.18.022.007.013-1892 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 592 B#A57-10 B#57-10 25 20.04 2565 32.18.022.007.013-1893 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 593 B#A57-11 B#57-11 25 20.04 2566 32.18.022.007.013-1894 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 594 B#A57-12 B#57-12 25 20.49 2567 32.18.022.007.013-1895 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 595 B#A57-15 B#57-15 25 20.53 2568 32.18.022.007.013-1896 355,790,750 50,904,000 51,000,000 5,610,000 1,275,000 2,550,000 60,435,000 295,355,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 596 B#A57-16 B#57-16 25 20.15 2569 32.18.022.007.013-1897 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 597 B#A57-17 B#57-17 25 19.94 2570 32.18.022.007.013-1898 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 598 B#A57-20 B#57-20 25 19.76 2571 32.18.022.007.013-1901 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 599 B#A57-21 B#57-21 25 20.48 2572 32.18.022.007.013-1902 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 600 B#A57-25 B#57-25 25 19.71 2575 32.18.022.007.013-1905 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 601 B#A57-26 B#57-26 25 19.98 2576 32.18.022.007.013-1906 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 602 B#A57-27 B#57-27 25 19.30 2577 32.18.022.007.013-1907 355,790,750 46,504,000 47,000,000 5,170,000 1,175,000 2,350,000 55,695,000 300,095,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 603 B#A57-28 B#57-28 25 20.52 2578 32.18.022.007.013-1908 355,790,750 50,904,000 51,000,000 5,610,000 1,275,000 2,550,000 60,435,000 295,355,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 604 B#B57-07 B#57-07 42 30.62 2562 32.18.022.007.013-1890 597,728,460 63,879,000 64,000,000 7,040,000 1,600,000 3,200,000 75,840,000 521,888,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 605 B#B57-08 B#57-08 42 33.17 2563 32.18.022.007.013-1891 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 606 B#B57-18 B#57-18 42 32.09 2594 32.18.022.007.013-1899 597,728,460 65,714,000 66,000,000 7,260,000 1,650,000 3,300,000 78,210,000 519,518,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 607 B#B57-19 B#57-19 42 33.16 2595 32.18.022.007.013-1900 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 608 B#B57-22 B#57-22 42 33.28 2573 32.18.022.007.013-1903 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 609 B#B57-23 B#57-23 42 33.24 2574 32.18.022.007.013-1904 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 610 B#A31-15 B#31-15 25 20.53 4846 32.18.022.007.013-1560 398,646,600 50,904,000 51,000,000 5,610,000 1,275,000 2,550,000 60,435,000 338,211,600 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 611 B#A15-02 B#15-02 25 20.19 2795 32.18.022.007.013-1190 398,646,600 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 340,581,600 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 21 B#A17-16 B#17-16 25 20.15 3660 355,790,750 48,026,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 22 B#B06-07 B#06-07 42 30.62 4472 597,728,460 63,879,000 64,000,000 7,040,000 1,600,000 3,200,000 75,840,000 521,888,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 23 B#B06-19 B#06-19 42 33.16 4508 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 24 B#B06-22 B#06-22 42 33.28 4511 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 25 B#B06-23 B#06-23 42 33.24 4512 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 26 B#A07-01 B#07-01 25 20.54 4062 355,790,750 50,904,000 51,000,000 5,610,000 1,275,000 2,550,000 60,435,000 295,355,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 27 B#A07-03 B#07-03 25 20.19 4064 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 28 B#A07-05 B#07-05 25 20.11 4065 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 29 B#A07-06 B#07-06 25 18.85 4066 355,790,750 46,504,000 47,000,000 5,170,000 1,175,000 2,350,000 55,695,000 300,095,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 30 B#A07-09 B#07-09 25 19.72 4069 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 31 B#A07-10 B#07-10 25 20.04 4070 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 32 B#A07-11 B#07-11 25 20.04 4071 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 33 B#A07-12 B#07-12 25 20.49 4072 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 34 B#A07-15 B#07-15 25 20.53 4073 355,790,750 50,904,000 51,000,000 5,610,000 1,275,000 2,550,000 60,435,000 295,355,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 35 B#A07-16 B#07-16 25 20.15 4074 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 36 B#A07-17 B#07-17 25 19.94 4075 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 37 B#A07-20 B#07-20 25 19.76 4078 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 38 B#A07-21 B#07-21 25 20.48 4079 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 39 B#A07-25 B#07-25 25 19.71 4082 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 40 B#A07-26 B#07-26 25 19.98 4083 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 41 B#A07-27 B#07-27 25 19.30 4084 355,790,750 46,504,000 47,000,000 5,170,000 1,175,000 2,350,000 55,695,000 300,095,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 42 B#B07-07 B#07-07 42 30.62 4067 597,728,460 63,879,000 64,000,000 7,040,000 1,600,000 3,200,000 75,840,000 521,888,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 43 B#B07-08 B#07-08 42 33.17 4068 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 44 B#B07-18 B#07-18 42 32.09 4076 597,728,460 65,714,000 66,000,000 7,260,000 1,650,000 3,300,000 78,210,000 519,518,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 45 B#B07-19 B#07-19 42 33.16 4077 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 46 B#B07-22 B#07-22 42 33.28 4080 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 47 B#B07-23 B#07-23 42 33.24 4081 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 48 B#A08-01 B#08-01 25 20.54 3917 355,790,750 50,904,000 51,000,000 5,610,000 1,275,000 2,550,000 60,435,000 295,355,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 49 B#A08-03 B#08-03 25 20.19 3919 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 50 B#A08-06 B#08-06 25 18.85 3921 355,790,750 46,504,000 47,000,000 5,170,000 1,175,000 2,350,000 55,695,000 300,095,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 51 B#A08-09 B#08-09 25 19.72 3924 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 52 B#A08-10 B#08-10 25 20.04 3938 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 53 B#A08-11 B#08-11 25 20.04 3939 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 54 B#A08-12 B#08-12 25 20.49 3940 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 55 B#A08-15 B#08-15 25 20.53 3941 355,790,750 50,904,000 51,000,000 5,610,000 1,275,000 2,550,000 60,435,000 295,355,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 56 B#A08-16 B#08-16 25 20.15 3942 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 57 B#A08-17 B#08-17 25 19.94 3943 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 58 B#A08-20 B#08-20 25 19.76 3946 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 59 B#A08-21 B#08-21 25 20.48 3947 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 60 B#A08-25 B#08-25 25 19.71 3963 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 61 B#A08-26 B#08-26 25 19.98 3964 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 62 B#A08-27 B#08-27 25 19.30 3965 355,790,750 46,504,000 47,000,000 5,170,000 1,175,000 2,350,000 55,695,000 300,095,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 63 B#A08-28 B#08-28 25 20.52 3966 355,790,750 50,904,000 51,000,000 5,610,000 1,275,000 2,550,000 60,435,000 295,355,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 64 B#B08-07 B#08-07 42 30.62 3922 597,728,460 63,879,000 64,000,000 7,040,000 1,600,000 3,200,000 75,840,000 521,888,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 65 B#B08-08 B#08-08 42 33.17 3923 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 66 B#B08-18 B#08-18 42 32.09 3944 597,728,460 65,714,000 66,000,000 7,260,000 1,650,000 3,300,000 78,210,000 519,518,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 67 B#B08-19 B#08-19 42 33.16 3945 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 68 B#B08-22 B#08-22 42 33.28 3948 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 69 B#B08-23 B#08-23 42 33.24 3949 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 70 B#A09-02 B#09-02 25 20.19 1102 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 71 B#A09-03 B#09-03 25 20.19 1103 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 72 B#A09-05 B#09-05 25 20.11 1104 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 73 B#A09-06 B#09-06 25 18.85 1105 355,790,750 46,504,000 47,000,000 5,170,000 1,175,000 2,350,000 55,695,000 300,095,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 74 B#A09-09 B#09-09 25 19.72 1108 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 75 B#A09-10 B#09-10 25 20.04 1109 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 76 B#A09-11 B#09-11 25 20.04 1110 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 77 B#A09-12 B#09-12 25 20.49 1111 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 78 B#A09-16 B#09-16 25 20.15 1113 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 79 B#A09-17 B#09-17 25 19.94 1114 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 80 B#A09-20 B#09-20 25 19.76 1117 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 81 B#A09-21 B#09-21 25 20.48 1118 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 82 B#A09-25 B#09-25 25 19.71 1121 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 83 B#A09-26 B#09-26 25 19.98 1122 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 84 B#A09-28 B#09-28 25 20.52 1124 355,790,750 50,904,000 51,000,000 5,610,000 1,275,000 2,550,000 60,435,000 295,355,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 85 B#B09-07 B#09-07 42 30.62 1106 597,728,460 63,879,000 64,000,000 7,040,000 1,600,000 3,200,000 75,840,000 521,888,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 86 B#B09-08 B#09-08 42 33.17 1107 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 87 B#B09-18 B#09-18 42 32.09 1115 597,728,460 65,714,000 66,000,000 7,260,000 1,650,000 3,300,000 78,210,000 519,518,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM 88 B#B09-19 B#09-19 42 33.16 1116 597,728,460
Page 9
126 B#A11-27 B#11-27 25 19.30 1926 355,790,750 46,504,000 47,000,000 5,170,000 1,175,000 2,350,000 55,695,000 300,095,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
127 B#A11-28 B#11-28 25 20.52 1927 355,790,750 50,904,000 51,000,000 5,610,000 1,275,000 2,550,000 60,435,000 295,355,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
128 B#B11-07 B#11-07 42 30.62 1896 597,728,460 63,879,000 64,000,000 7,040,000 1,600,000 3,200,000 75,840,000 521,888,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
129 B#B11-08 B#11-08 42 33.17 1897 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
130 B#B11-18 B#11-18 42 32.09 1905 597,728,460 65,714,000 66,000,000 7,260,000 1,650,000 3,300,000 78,210,000 519,518,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
131 B#B11-19 B#11-19 42 33.16 1919 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
132 B#B11-22 B#11-22 42 33.28 1922 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
133 B#B11-23 B#11-23 42 33.24 1923 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
134 B#A12-03 B#12-03 25 20.19 2045 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
135 B#A12-05 B#12-05 25 20.11 2046 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
136 B#A12-09 B#12-09 25 19.72 2050 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
137 B#A12-10 B#12-10 25 20.04 2051 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
138 B#A12-11 B#12-11 25 20.04 2052 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
139 B#A12-17 B#12-17 25 19.94 2056 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
140 B#A12-20 B#12-20 25 19.76 1783 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
141 B#A12-21 B#12-21 25 20.48 1784 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
142 B#A12-25 B#12-25 25 19.71 1787 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
143 B#A12-26 B#12-26 25 19.98 1788 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
144 B#A12-27 B#12-27 25 19.30 1789 355,790,750 46,504,000 47,000,000 5,170,000 1,175,000 2,350,000 55,695,000 300,095,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
145 B#A12-28 B#12-28 25 20.52 1790 355,790,750 50,904,000 51,000,000 5,610,000 1,275,000 2,550,000 60,435,000 295,355,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
146 B#B12-07 B#12-07 42 30.62 2048 597,728,460 63,879,000 64,000,000 7,040,000 1,600,000 3,200,000 75,840,000 521,888,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
147 B#B12-08 B#12-08 42 33.17 2049 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
148 B#B12-18 B#12-18 42 32.09 1781 597,728,460 65,714,000 66,000,000 7,260,000 1,650,000 3,300,000 78,210,000 519,518,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
149 B#B12-19 B#12-19 42 33.16 1782 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
150 B#B12-22 B#12-22 42 33.28 1785 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
151 B#B12-23 B#12-23 42 33.24 1786 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
152 B#A15-01 B#15-01 25 20.54 2794 355,790,750 50,904,000 51,000,000 5,610,000 1,275,000 2,550,000 60,435,000 295,355,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
153 B#A15-03 B#15-03 25 20.19 2796 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
154 B#A15-06 B#15-06 25 18.85 2798 355,790,750 46,504,000 47,000,000 5,170,000 1,175,000 2,350,000 55,695,000 300,095,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
155 B#A15-09 B#15-09 25 19.72 2801 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
156 B#A15-10 B#15-10 25 20.04 2802 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
157 B#A15-11 B#15-11 25 20.04 2803 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
158 B#A15-12 B#15-12 25 20.49 2804 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
159 B#A15-17 B#15-17 25 19.94 2807 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
160 B#A15-20 B#15-20 25 19.76 2810 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
161 B#A15-21 B#15-21 25 20.48 2811 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
162 B#A15-25 B#15-25 25 19.71 2814 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
163 B#A15-26 B#15-26 25 19.98 2815 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
164 B#A15-27 B#15-27 25 19.30 2816 355,790,750 46,504,000 47,000,000 5,170,000 1,175,000 2,350,000 55,695,000 300,095,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
165 B#A15-28 B#15-28 25 20.52 2817 355,790,750 50,904,000 51,000,000 5,610,000 1,275,000 2,550,000 60,435,000 295,355,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
166 B#B15-18 B#15-18 42 32.09 2808 597,728,460 65,714,000 66,000,000 7,260,000 1,650,000 3,300,000 78,210,000 519,518,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
167 B#B15-19 B#15-19 42 33.16 2809 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
168 B#B15-22 B#15-22 42 33.28 2812 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
169 B#B15-23 B#15-23 42 33.24 2813 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
170 B#A16-01 B#16-01 25 20.54 3556 355,790,750 50,904,000 51,000,000 5,610,000 1,275,000 2,550,000 60,435,000 295,355,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
171 B#A16-05 B#16-05 25 20.11 3559 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
172 B#A16-09 B#16-09 25 19.72 3563 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
173 B#A16-10 B#16-10 25 20.04 3564 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
174 B#A16-11 B#16-11 25 20.04 3565 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
175 B#A16-12 B#16-12 25 20.49 3566 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
176 B#A16-15 B#16-15 25 20.53 3567 355,790,750 50,904,000 51,000,000 5,610,000 1,275,000 2,550,000 60,435,000 295,355,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
177 B#A16-16 B#16-16 25 20.15 3568 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
178 B#A16-17 B#16-17 25 19.94 3569 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
179 B#A17-27 B#17-27 25 19.30 3670 355,790,750 45,826,000 46,000,000 5,060,000 1,150,000 2,300,000 54,510,000 301,280,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
180 B#A17-15 B#17-15 25 20.53 3659 355,790,750 50,226,000 51,000,000 5,610,000 1,275,000 2,550,000 60,435,000 295,355,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
181 B#A18-27 B#18-27 25 19.30 4580 355,790,750 46,504,000 47,000,000 5,170,000 1,175,000 2,350,000 55,695,000 300,095,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
182 B#A26-10 B#26-10 25 20.04 1563 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
183 B#A09-01 B#09-01 25 20.54 1101 355,790,750 50,904,000 51,000,000 5,610,000 1,275,000 2,550,000 60,435,000 295,355,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
184 B#A19-17 B#19-17 25 19.94 2265 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
185 B#A27-12 B#27-12 25 20.49 1437 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
186 B#A21-15 B#21-15 25 20.53 2135 355,790,750 50,904,000 51,000,000 5,610,000 1,275,000 2,550,000 60,435,000 295,355,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
187 B#A17-17 B#17-17 25 19.94 3661 355,790,750 48,026,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
188 B#A17-26 B#17-26 25 19.98 3669 355,790,750 48,026,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 PT. BUMI WARDANA AKAN DIBATALKAN TAHAP 2 - UM
Grand Total 11,190 8,868.03 159,337,651,400 20,393,251,000 20,513,000,000 2,256,430,000 512,825,000 1,025,650,000 24,307,905,000 135,029,746,400
Page 10
CHADSTONE
TOWER C
REIMBURSE FIT
NO Tower Floor Type UNIT View Unit KODE SQM Nett NO. SERTI NOP HARGA INVESTASI NJOP NILAI AJB PPN 11% AJB PPh 2.5% BPHTB 5% TOTAL HJB Harga Investasi Nilai Roya Nilai Roya New KETERANGAN
OUT
1 C FLOOR 17 2BR C#B17-23 City 1 C#17-23 42 32.78 3691 31.18.022.007.013-2168 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 597,728,460 291,728,460 450,000,000 PT. SINO PROPERTINDO INTERNASIONAL
2 C FLOOR 27 2BR C#B27-22 City 1 C#27-22 42 32.94 1376 31.18.022.007.013-2383 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 597,728,460 291,728,460 450,000,000 PT. SINO PROPERTINDO INTERNASIONAL
3 C FLOOR 28 2BR C#B28-22 City 1 C#28-22 42 32.94 1327 31.18.022.007.013-2407 669,726,288 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 589,146,288 597,728,460 291,728,460 450,000,000 PT. SINO PROPERTINDO INTERNASIONAL
4 C FLOOR 33 2BR C#B33-07 Pool 1 C#33-07 42 30.47 2694 31.18.022.007.013-2514 597,728,460 62,046,000 63,000,000 6,930,000 1,575,000 3,150,000 74,655,000 523,073,460 597,728,460 291,728,460 450,000,000 PT. SINO PROPERTINDO INTERNASIONAL
5 C FLOOR 35 2BR C#B35-22 City 1 C#35-22 42 32.94 1752 31.18.022.007.013-2551 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 597,728,460 291,728,460 450,000,000 PT. SINO PROPERTINDO INTERNASIONAL
6 C FLOOR 36 2BR C#B36-22 City 1 C#36-22 42 32.94 3303 31.18.022.007.013-2575 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 597,728,460 291,728,460 450,000,000 PT. SINO PROPERTINDO INTERNASIONAL
7 C FLOOR 36 2BR C#B36-23 City 1 C#36-23 42 32.78 3304 31.18.022.007.013-2576 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 597,728,460 291,728,460 450,000,000 PT. SINO PROPERTINDO INTERNASIONAL
8 C FLOOR 37 2BR C#B37-22 City 1 C#37-22 42 32.94 3131 31.18.022.007.013-2599 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 597,728,460 291,728,460 450,000,000 PT. SINO PROPERTINDO INTERNASIONAL
9 C FLOOR 37 2BR C#B37-23 City 1 C#37-23 42 32.78 3132 31.18.022.007.013-2600 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 597,728,460 291,728,460 450,000,000 PT. SINO PROPERTINDO INTERNASIONAL
10 C FLOOR 38 2BR C#B38-07 Pool 1 C#38-07 42 30.47 3240 31.18.022.007.013-2610 597,728,460 62,046,000 63,000,000 6,930,000 1,575,000 3,150,000 74,655,000 523,073,460 597,728,460 291,728,460 450,000,000 PT. SINO PROPERTINDO INTERNASIONAL
11 C FLOOR 38 2BR C#B38-22 City 1 C#38-22 42 32.94 3266 31.18.022.007.013-2623 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 597,728,460 291,728,460 450,000,000 PT. SINO PROPERTINDO INTERNASIONAL
12 C FLOOR 50 2BR C#B50-22 City 1 C#50-22 42 32.94 4705 31.18.022.007.013-2671 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 597,728,460 291,728,460 450,000,000 PT. SINO PROPERTINDO INTERNASIONAL
13 C FLOOR 50 2BR C#B50-23 City 1 C#50-23 42 32.78 4706 31.18.022.007.013-2672 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 597,728,460 291,728,460 450,000,000 PT. SINO PROPERTINDO INTERNASIONAL
14 C FLOOR 51 2BR C#B51-22 City 1 C#51-22 42 32.94 4415 31.18.022.007.013-2695 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 597,728,460 291,728,460 450,000,000 PT. SINO PROPERTINDO INTERNASIONAL
15 C FLOOR 51 2BR C#B51-23 City 1 C#51-23 42 32.78 4416 31.18.022.007.013-2696 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 597,728,460 291,728,460 450,000,000 PT. SINO PROPERTINDO INTERNASIONAL
16 C FLOOR 52 2BR C#B52-22 City 1 C#52-22 42 32.94 3835 31.18.022.007.013-2719 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 597,728,460 291,728,460 450,000,000 PT. SINO PROPERTINDO INTERNASIONAL
17 C FLOOR 52 2BR C#B52-23 City 1 C#52-23 42 32.78 3836 31.18.022.007.013-2720 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 597,728,460 291,728,460 450,000,000 PT. SINO PROPERTINDO INTERNASIONAL
18 C FLOOR 53 2BR C#B53-07 Pool 1 C#53-07 42 30.47 3974 31.18.022.007.013-2730 597,728,460 62,046,000 63,000,000 6,930,000 1,575,000 3,150,000 74,655,000 523,073,460 597,728,460 291,728,460 450,000,000 PT. SINO PROPERTINDO INTERNASIONAL
19 C FLOOR 53 2BR C#B53-08 Pool 1 C#53-08 42 33.14 3975 31.18.022.007.013-2731 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 597,728,460 291,728,460 450,000,000 PT. SINO PROPERTINDO INTERNASIONAL
20 C FLOOR 53 2BR C#B53-22 City 1 C#53-22 42 32.94 3707 31.18.022.007.013-2743 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 597,728,460 291,728,460 450,000,000 PT. SINO PROPERTINDO INTERNASIONAL
21 C FLOOR 53 2BR C#B53-23 City 1 C#53-23 42 32.78 3708 31.18.022.007.013-2744 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 597,728,460 291,728,460 450,000,000 PT. SINO PROPERTINDO INTERNASIONAL
22 C FLOOR 55 2BR C#B55-07 Pool 1 C#55-07 42 30.47 2382 31.18.022.007.013-2754 597,728,460 62,046,000 63,000,000 6,930,000 1,575,000 3,150,000 74,655,000 523,073,460 597,728,460 291,728,460 450,000,000 PT. SINO PROPERTINDO INTERNASIONAL
23 C FLOOR 55 2BR C#B55-08 Pool 1 C#55-08 42 33.14 2383 31.18.022.007.013-2755 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 597,728,460 291,728,460 450,000,000 PT. SINO PROPERTINDO INTERNASIONAL
24 C FLOOR 55 2BR C#B55-22 City 1 C#55-22 42 32.94 2395 31.18.022.007.013-2767 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 597,728,460 291,728,460 450,000,000 PT. SINO PROPERTINDO INTERNASIONAL
25 C FLOOR 55 2BR C#B55-23 City 1 C#55-23 42 32.78 2396 31.18.022.007.013-2768 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 597,728,460 291,728,460 450,000,000 PT. SINO PROPERTINDO INTERNASIONAL
26 C FLOOR 56 2BR C#B56-07 Pool 1 C#56-07 42 30.47 2494 31.18.022.007.013-2778 597,728,460 62,046,000 63,000,000 6,930,000 1,575,000 3,150,000 74,655,000 523,073,460 597,728,460 291,728,460 450,000,000 PT. SINO PROPERTINDO INTERNASIONAL
27 C FLOOR 56 2BR C#B56-08 Pool 1 C#56-08 42 33.14 2495 31.18.022.007.013-2779 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 597,728,460 291,728,460 450,000,000 PT. SINO PROPERTINDO INTERNASIONAL
28 C FLOOR 56 2BR C#B56-23 City 1 C#56-23 42 32.78 2520 31.18.022.007.013-2792 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 597,728,460 291,728,460 450,000,000 PT. SINO PROPERTINDO INTERNASIONAL
29 C FLOOR 57 2BR C#B57-07 Pool 1 C#57-07 42 30.47 2581 31.18.022.007.013-2802 597,728,460 62,046,000 63,000,000 6,930,000 1,575,000 3,150,000 74,655,000 523,073,460 597,728,460 291,728,460 450,000,000 PT. SINO PROPERTINDO INTERNASIONAL
30 C FLOOR 57 2BR C#B57-08 Pool 1 C#57-08 42 33.14 2582 31.18.022.007.013-2803 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 597,728,460 291,728,460 450,000,000 PT. SINO PROPERTINDO INTERNASIONAL
31 C FLOOR 57 2BR C#B57-22 City 1 C#57-22 42 32.94 2596 31.18.022.007.013-2815 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 597,728,460 291,728,460 450,000,000 PT. SINO PROPERTINDO INTERNASIONAL
32 C FLOOR 57 2BR C#B57-23 City 1 C#57-23 42 32.78 2597 31.18.022.007.013-2816 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 597,728,460 291,728,460 450,000,000 PT. SINO PROPERTINDO INTERNASIONAL
33 C FLOOR 58 2BR C#B58-08 Pool 1 C#58-08 42 33.14 3005 31.18.022.007.013-2827 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 597,728,460 291,728,460 450,000,000 PT. SINO PROPERTINDO INTERNASIONAL
34 C FLOOR 58 2BR C#B58-23 City 1 C#58-23 42 32.78 3031 31.18.022.007.013-2840 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 597,728,460 291,728,460 450,000,000 PT. SINO PROPERTINDO INTERNASIONAL
35 C FLOOR 50 2BR C#B50-19 City 1 C#50-19 42 33.14 4665 31.18.022.007.013-2668 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 597,728,460 291,728,460 450,000,000 PT. SINO PROPERTINDO INTERNASIONAL
36 C FLOOR 53 2BR C#B53-18 City 1 C#53-18 42 32.07 3983 31.18.022.007.013-2739 597,728,460 65,712,000 66,000,000 7,260,000 1,650,000 3,300,000 78,210,000 519,518,460 597,728,460 291,728,460 450,000,000 PT. SINO PROPERTINDO INTERNASIONAL
37 C FLOOR 53 2BR C#B53-19 City 1 C#53-19 42 33.14 3984 31.18.022.007.013-2740 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 597,728,460 291,728,460 450,000,000 PT. SINO PROPERTINDO INTERNASIONAL
38 C FLOOR 58 2BR C#B58-19 City 1 C#58-19 42 33.14 3027 31.18.022.007.013-2836 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 597,728,460 291,728,460 450,000,000 PT. SINO PROPERTINDO INTERNASIONAL
39 C FLOOR 16 2BR C#B16-22 City 1 C#16-22 42 32.94 3598 31.18.022.007.013-2143 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 597,728,460 291,728,460 450,000,000 PT. SINO PROPERTINDO INTERNASIONAL
40 C FLOOR 33 2BR C#B33-22 City 1 C#33-22 42 32.94 2707 31.18.022.007.013-2527 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 597,728,460 291,728,460 450,000,000 PT. SINO PROPERTINDO INTERNASIONAL
41 C FLOOR 33 2BR C#B33-23 City 1 C#33-23 42 32.78 2708 31.18.022.007.013-2528 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 597,728,460 291,728,460 450,000,000 PT. SINO PROPERTINDO INTERNASIONAL
42 C FLOOR 51 2BR C#B51-18 City 1 C#51-18 42 32.07 4395 31.18.022.007.013-2691 669,726,288 65,712,000 66,000,000 7,260,000 1,650,000 3,300,000 78,210,000 591,516,288 597,728,460 291,728,460 450,000,000 PT. SINO PROPERTINDO INTERNASIONAL
43 C FLOOR 31 2BR C#B31-23 City 1 C#31-23 42 32.78 4503 31.18.022.007.013-2480 669,726,288 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 589,146,288 597,728,460 291,728,460 450,000,000 PT. SINO PROPERTINDO INTERNASIONAL
44 C FLOOR 53 1BR C#A53-01 Pool 1 C#53-01 25 20.53 3958 31.18.022.007.013-2725 355,790,750 50,904,000 51,000,000 5,610,000 1,275,000 2,550,000 60,435,000 295,355,750 355,790,750 173,790,750 295,000,000 PT. SINO PROPERTINDO INTERNASIONAL
45 C FLOOR 53 1BR C#A53-02 Pool 1 C#53-02 25 20.19 3959 31.18.022.007.013-2726 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 355,790,750 173,790,750 295,000,000 PT. SINO PROPERTINDO INTERNASIONAL
46 C FLOOR 53 1BR C#A53-03 Pool 1 C#53-03 25 20.19 3960 31.18.022.007.013-2727 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 355,790,750 173,790,750 295,000,000 PT. SINO PROPERTINDO INTERNASIONAL
47 C FLOOR 53 1BR C#A53-05 Pool 1 C#53-05 25 20.11 3961 31.18.022.007.013-2728 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 355,790,750 173,790,750 295,000,000 PT. SINO PROPERTINDO INTERNASIONAL
48 C FLOOR 53 1BR C#A53-06 Pool 1 C#53-06 25 18.71 3962 31.18.022.007.013-2729 355,790,750 46,504,000 47,000,000 5,170,000 1,175,000 2,350,000 55,695,000 300,095,750 355,790,750 173,790,750 295,000,000 PT. SINO PROPERTINDO INTERNASIONAL
49 C FLOOR 53 1BR C#A53-10 Pool 1 C#53-10 25 20.01 3977 31.18.022.007.013-2733 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 355,790,750 173,790,750 295,000,000 PT. SINO PROPERTINDO INTERNASIONAL
50 C FLOOR 53 1BR C#A53-11 Pool 1 C#53-11 25 20.15 3978 31.18.022.007.013-2734 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 355,790,750 173,790,750 295,000,000 PT. SINO PROPERTINDO INTERNASIONAL
51 C FLOOR 53 1BR C#A53-12 Pool 1 C#53-12 25 20.51 3979 31.18.022.007.013-2735 355,790,750 50,904,000 51,000,000 5,610,000 1,275,000 2,550,000 60,435,000 295,355,750 355,790,750 173,790,750 295,000,000 PT. SINO PROPERTINDO INTERNASIONAL
52 C FLOOR 53 1BR C#A53-15 City 1 C#53-15 25 20.53 3980 31.18.022.007.013-2736 355,790,750 50,904,000 51,000,000 5,610,000 1,275,000 2,550,000 60,435,000 295,355,750 355,790,750 173,790,750 295,000,000 PT. SINO PROPERTINDO INTERNASIONAL
53 C FLOOR 53 1BR C#A53-17 City 1 C#53-17 25 19.97 3982 31.18.022.007.013-2738 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 355,790,750 173,790,750 295,000,000 PT. SINO PROPERTINDO INTERNASIONAL
54 C FLOOR 50 2BR C#B50-07 Pool 1 C#50-07 42 30.47 4655 31.18.022.007.013-2658 597,728,460 62,046,000 63,000,000 6,930,000 1,575,000 3,150,000 74,655,000 523,073,460 597,728,460 291,728,460 450,000,000 PT. SINO PROPERTINDO INTERNASIONAL
55 C FLOOR 51 2BR C#B51-07 Pool 1 C#51-07 42 30.47 4386 31.18.022.007.013-2682 597,728,460 62,046,000 63,000,000 6,930,000 1,575,000 3,150,000 74,655,000 523,073,460 597,728,460 291,728,460 450,000,000 PT. SINO PROPERTINDO INTERNASIONAL
56 C FLOOR 52 2BR C#B52-07 Pool 1 C#52-07 42 30.47 3822 31.18.022.007.013-2706 597,728,460 62,046,000 63,000,000 6,930,000 1,575,000 3,150,000 74,655,000 523,073,460 597,728,460 291,728,460 450,000,000 PT. SINO PROPERTINDO INTERNASIONAL
57 C FLOOR 52 2BR C#B52-08 Pool 1 C#52-08 42 33.14 3823 31.18.022.007.013-2707 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 597,728,460 291,728,460 450,000,000 PT. SINO PROPERTINDO INTERNASIONAL
58 HGB 5699 HGB 5699 7925 7,925.00 05699/Pasirsari 22,088,400,000 18,639,600,000 18,640,000,000 2,050,400,000 466,000,000 932,000,000 22,088,400,000 - PT. SINO PROPERTINDO INTERNASIONAL
1 C#A26-26 25 20.10 1604 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 597,728,460 291,728,460 450,000,000 PT. SINO PROPERTINDO INTERNASIONAL
2 C#A39-06 25 18.71 1231 355,790,750 46,504,000 47,000,000 5,170,000 1,175,000 2,350,000 55,695,000 300,095,750 597,728,460 291,728,460 450,000,000 PT. SINO PROPERTINDO INTERNASIONAL
3 C#B50-08 42 33.14 4656 597,728,460 67,545,000 68,000,000 7,480,000 1,700,000 3,400,000 80,580,000 517,148,460 597,728,460 291,728,460 450,000,000 PT. SINO PROPERTINDO INTERNASIONAL
4 C#A51-10 25 20.01 4389 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 597,728,460 291,728,460 450,000,000 PT. SINO PROPERTINDO INTERNASIONAL
5 C#A51-11 25 20.15 4390 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 597,728,460 291,728,460 450,000,000 PT. SINO PROPERTINDO INTERNASIONAL
6 C#A56-03 25 20.19 2491 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 597,728,460 291,728,460 450,000,000 PT. SINO PROPERTINDO INTERNASIONAL
7 C#A56-06 25 18.71 2493 355,790,750 46,504,000 47,000,000 5,170,000 1,175,000 2,350,000 55,695,000 300,095,750 597,728,460 291,728,460 450,000,000 PT. SINO PROPERTINDO INTERNASIONAL
8 C#A57-06 25 18.71 2427 355,790,750 46,504,000 47,000,000 5,170,000 1,175,000 2,350,000 55,695,000 300,095,750 597,728,460 291,728,460 450,000,000 PT. SINO PROPERTINDO INTERNASIONAL
9 C#A58-06 25 18.71 3003 355,790,750 46,504,000 47,000,000 5,170,000 1,175,000 2,350,000 55,695,000 300,095,750 597,728,460 291,728,460 450,000,000 PT. SINO PROPERTINDO INTERNASIONAL
10 C#A58-11 25 20.15 3008 355,790,750 48,704,000 49,000,000 5,390,000 1,225,000 2,450,000 58,065,000 297,725,750 597,728,460 291,728,460 450,000,000 PT. SINO PROPERTINDO INTERNASIONAL
11 C#A58-12 25 20.51 3009 355,790,750 50,904,000 51,000,000 5,610,000 1,275,000 2,550,000 60,435,000 295,355,750 597,728,460 291,728,460 450,000,000 PT. SINO PROPERTINDO INTERNASIONAL
12 C#A58-27 25 19.17 3034 355,790,750 46,504,000 47,000,000 5,170,000 1,175,000 2,350,000 55,695,000 300,095,750 597,728,460 291,728,460 450,000,000 PT. SINO PROPERTINDO INTERNASIONAL
13 C#B58-07 42 30.47 3004 597,728,460 62,046,000 63,000,000 6,930,000 1,575,000 3,150,000 74,655,000 523,073,460 597,728,460 291,728,460 450,000,000 PT. SINO PROPERTINDO INTERNASIONAL
Grand Total 57 10,508 9,928.56 59,064,693,774 22,909,033,000 22,943,000,000 2,523,730,000 573,575,000 1,147,150,000 27,187,455,000 31,877,238,774 31,651,145,120 15,449,145,120 24,100,000,000
Names mentioned 16 people and organisations named in the text · linked when the evidence is strong
unresolved
person
DR. MURTONO SABARUDIN
p.1
unresolved
person
Hj RA SRI SUMANI EFFENDHY
p.1 ×4
unresolved
person
H. CHOLIL YUSAK
p.1
unresolved
person
DRS. SOENARNO
p.2
unresolved
org
PT SILIWANGI BIMANTARA PERDANA Advance Payment
p.4
unresolved
org
PT POLLUX ADITAMA KENCANA
p.4 ×11
unresolved
org
PT Pollux Aditama Kencana Audit Adjustment
p.4
unresolved
org
PT Pollux Aditama Kencana PAK
p.4
unresolved
org
PT. POLLUX BARELANG
p.4
unresolved
org
PT. POLLUX BARELANG MEGASUPERBLOK
p.4
unresolved
org
PT. SILIWANGI BIMANTARA PERDANA
p.5 ×191
unresolved
org
PT. BUMI WARDANA
p.6 ×309
unresolved
org
PT. SINO PROPERTINDO INTERNASIONAL
p.6 ×72
unresolved
org
PT. SINO PROPERTINDO INTERNASIONAL Grand Total
p.10
Extraction attempts how the parser did, and what it refused
Nothing structured was extracted from this document — the attempts below say why.
No extraction attempted yet.