Skip to content
Back to announcement

20260112_GEMS_Laporan Bulanan Aktivitas Eksplorasi_32018920_lamp1.pdf

Other Text extracted GEMS

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 6

Page 1
No. 003/GEMS-CS/I/2026                                                                      Jakarta, 12 Januari/January 2026

Kepada Yth.:
Direksi PT Bursa Efek Indonesia
Gedung Bursa Efek Indonesia Tower I
Jln. Jend. Sudirman Kav 52-53
Jakarta 10190

U.p. : : Kepala Divisi Penilaian Perusahaan 2) /
       Head of Corporate Valuation Division 2

Perihal : Laporan Aktivitas Eksplorasi periode Q4 2025              Subject : Exploration Activity Q4 2025 Report

Dengan hormat,                                                      Sincerely,

Sehubungan dengan Peraturan PT Bursa Efek Indonesia                 In accordance to Indonesia Stock Exchange Regulation
Nomor I-E tanggal 31 Desember 2022 tentang Kewajiban                No. I-E dated 31 December 2022 concerning
Penyampaian Informasi, maka dengan ini kami                         Information Submission Obligation, we hereby submit
sampaikan Laporan Aktivitas Eksplorasi Pertambangan                 the Exploration Activity for the period of Q4 2025 of the
periode Q4 2025 di lingkungan anak-anak Perusahaan                  Company’s subsidiaries as attached.
PT Golden Energy Mines Tbk (“Perseroan”) sebagaimana
terlampir.

Dalam      hal     terdapat  perbedaan penafsiran                   In the event there is any difference of
informasi yang diumumkan dalam Bahasa Inggris dan                   interpreting the information notified in English
Bahasa Indonesia, maka informasi yang digunakan                     language and Indonesian language, the Indonesian
sebagai acuan adalah informasi dalam Bahasa                         language shall prevail.
Indonesia.

Demikian kami sampaikan. Atas perhatiannya kami Thank you for your attention and co-operation.
ucapkan terima kasih.

Hormat kami/Sincerely yours,
PT Golden Energy Mines Tbk




Sudin, SH
Corporate Secretary



Tembusan/Copies :
   - Direksi Perseroan/Board of Directors of the Company.
                                        PT. Golden Energy Mines Tbk.
               Sinar Mas Land Plaza Tower II, 6th Floor Jl. MH. Thamrin No. 51 Kav. 22, Jakarta Pusat 10350
                                   Phone: (62) 21 50186 888 , Fax: (62) 21 3199 0319
                                        Website: www.goldenenergymines.com
Page 2
1. PT Kuansing Inti Makmur (“KIM”) dan anak perusahaan
   (KIM Blok) / and its subsidiaries (KIM Block)
   Tidak ada kegiatan eksplorasi di area KIM Blok pada There is no exploration activity in the mine area of
   periode Q4 2025.                                    KIM Block for the period of Q4 2025.

2. PT Borneo Indobara (“BIB”)
   2.1. Daerah Eksplorasi                                  2.1. Exploration Activity
        Kegiatan pengeboran eksplorasi meliputi 3 kegiatan      Exploration drilling activities include 3 main
        utama, yaitu pengeboran eksplorasi preproduksi,         activities, namely preproduction exploration
        pengeboran eksplorasi pengembangan, dan                 drilling, development exploration drilling, and
        pengeboran geoteknik.                                   geotechnical drilling.
        Kegiatan pengeboran preproduksi dilakukan untuk         Preproduction drilling activities are carried
        melengkapi data pemodelan geologi dan kualitas          out to complement geological modeling data
        batubara pada masing-masing area. Pengeboran            and coal quality in each area. Development
        eksplorasi     pengembangan       bertujuan untuk       exploration drilling aims to obtain lithology
        mendapatkan data litologi dan kualitas batubara         and coal quality data for geological modeling
        untuk pembuatan model geologi serta mendukung           and to support the addition of new coal
        penambahan sumberdaya batubara baru pada area           resources in areas where exploration has
        yang belum pernah dilakukan kegiatan eksplorasi.        never been carried out. Geotechnical drilling
        Kegiatan pengeboran geoteknik dilakukan untuk           activities are carried out to determine the
        mengetahui daya dukung tanah dan sifat fisik            carrying capacity of the soil and the physical
        batuan pada area pit penambangan dan disposal           properties of the rock in the mining area and
        serta di area project perusahaan.                       disposal area in the company.
        Kegiatan pengeboran periode Q4 2025 dilakukan           Drilling activities in Q4 2025 were carried out
        pengeboran eksplorasi preproduksi di area               by preproduction exploration in North
        Girimulya Utara.                                        Girimulya.

  2.2. Metode Pengeboran                                  2.2. Drilling Methods
       Pada periode Q4 2025, pengeboran eksplorasi             For the period of Q4 2025, preproduction
       preproduksi dilakukan dengan metode open hole           exploration drilling was carried out using
       dan part coring. Kegiatan geofisika logging             open holes and part coring. Geophysical
       dilakukan di seluruh lubang bor yang telah selesai      logging activities are carried out in all drilled
       dilakukan untuk memastikan kedalaman top dan            holes that have been completed to ensure
       bottom batubara sehingga ketebalan batubara             the depth of the top and bottom of the coal
       dapat diketahui lebih akurat dan untuk mengetahui       so that the thickness of the coal can be
       varian dan karakteristik batuan non batubara            known more accurately and to determine the
       berdasarkan perekaman gelombang gamma ray dan           characteristics of non-coal rock based on
       density.                                                recording gamma ray waves and density.

  2.3. Pelaksanaan dan Pengawasan Kegiatan Eksplorasi 2.3. Exploration Activities Progress & Supervision
       Kegiatan pengeboran eksplorasi dan geoteknik        Exploration and geotechnical drilling activities
       dilakukan oleh Departemen Survey, Geotech &         carried out by the Survey, Geotech &
       Exploration (SGE) BIB.                              Exploration (SGE) Department of BIB.
       Untuk mendukung kegiatan pengeboran eksplorasi      To support the preproduction exploration
                                           PT. Golden Energy Mines Tbk.
                  Sinar Mas Land Plaza Tower II, 6th Floor Jl. MH. Thamrin No. 51 Kav. 22, Jakarta Pusat 10350
                                      Phone: (62) 21 50186 888 , Fax: (62) 21 3199 0319
                                           Website: www.goldenenergymines.com
Page 3
       preproduksi dan eksplorasi pengembangan berupa                           drilling and development exploration
       pengeboran open hole dan coring digunakan 2 unit                         activities such as open hole and coring
       rig inhouse yaitu 1 unit tipe Jacro 175 dan 1 unit tipe                  geotechnical drilling, units type of inhouse rig
       Jacro 500.. Seluruh unit rig dioperasikan oleh drilling                  were used, which are 1 unit Jacro 175 and 1
       operator BIB.                                                            unit Jacro 500. All rig units were operated by
                                                                                BIB drilling operator.
       Seluruh kegiatan pengeboran disupervisi langsung                         All drilling activities are directly supervised by
       oleh Wellsite Geologist, Departemen SGE dan                              the Wellsite Geologist, SGE Department and
       Evaluator Geologist Departemen Strategic, Plan &                         Geologist Evaluator, Strategic, Plan &
       Optimization (SPO), seluruhnya dibawah Divisi Mine                       Optimization (SPO) Department, all under the
       Development & Contract Management (MDC) BIB.                             Mine Development & Contract Management
                                                                                (MDC) Division of BIB.

   2.4. Kemajuan Eksplorasi                                2.4. Exploration Progress
        Kegiatan pengeboran eksplorasi selama periode Q4         Drilling exploration for the period of Q4 2025
        2025 adalah sebagai berikut :                            are as follows :
                   Tabel 1.1. Kemajuan Pengeboran Ekplorasi dan Geoteknik periode Q4 2025/
                       Progress in Exploration and Geotechnical Drilling Period of Q4 2025
                     Lubang Geoteknik (m) /                              Lubang Eksplorasi (m) /
                     Geotech Drilling                                    Exploration Drilling

Lokasi               Jumlah       Total kedalaman (m) /                  Jumlah       Total kedalaman (m) /
Location             lubang       Total Depth                            lubang       Total Depth
                     /                                                   /
                     Total        Drilling           Logging             Total        Drilling                Logging
                     Holes                                               Holes
Girimulya Utara          -                -                  -             37             5.578,25                 5.143,60



   2.5. Biaya Eksplorasi                              2.5. Drilling Cost
        Untuk biaya eksplorasi selama periode Q4 2025      The exploration costs for the period of Q4
        adalah sebagai berikut :                           2025 are as follows :

                  Tabel 1.2. Biaya Pengeboran Eksplorasi dan Geoteknik RIG Inhouse periode Q4 2025 /
                           Exploration and Geotechnial Drilling Cost for the period of Q4 2025

                                                                          Year to Date
                   Operating Expense
                                                  Anggaran / Plan (Rp)           Realisasi / Realisation (Rp)
              Biaya Pengeboran /                 Rp. 43.021.789.073,70          Rp. 30.265.844.243,-
              Drilling Cost




                                              PT. Golden Energy Mines Tbk.
                    Sinar Mas Land Plaza Tower II, 6th Floor Jl. MH. Thamrin No. 51 Kav. 22, Jakarta Pusat 10350
                                        Phone: (62) 21 50186 888 , Fax: (62) 21 3199 0319
                                             Website: www.goldenenergymines.com
Page 4
3. PT Trisula Kencana Sakti (TKS)
   Tidak ada kegiatan eksplorasi di area TKS pada periode There is no exploration activity in the mine area of
   Q4 2025.                                               TKS for the period of Q4 2025.

4. PT Berkat Satria Abadi (BSA) dan PT Wahana Rimba
   Lestari (WRL)
   Tidak ada kegiatan eksplorasi di area BSA dan WRL pada There is no exploration activity in the mine area of
   periode Q4 2025.                                       BSA and WRL for the period of Q4 2025.

5. PT Barasentosa Lestari (BSL)
   5.1. Daerah Eksplorasi                                                5.1. Daerah Eksplorasi
        Kegiatan pengeboran eksplorasi BSL periode Q4                       Drilling activities of BSL in Q4 2025 was
        2025 dilakukan di area Blok Muara Lakitan. Tipe                     conducted in the Muara Lakitan Block area.
        pengeboran meliputi pengeboran open hole, coring                    The drilling types included open hole, coring
        (partial) dan full coring untuk mendapatkan sample                  (partial) and full coring to collect samples for
        kualitas batubara dam sample geoteknik.                             coal quality and geotechnical samples. Drilling
        Pengeboran pada Q4 2025 dilengkapi dengan                           activities in Q4 2025 was complemented by
        pengukuran geofisika logging dan pick up survey                     geophysical logging measurements and
        titik bor.                                                          drillhole pick up survey.

  5.2. Metode Pengeboran                                                 5.2. Drilling Method
       Pelaksanaan pengeboran pada blok Muara Lakitan                       Drilling activities at Muara Lakitan Block is
       dilaksanakan dengan memakai sistem grid, dengan                      carried out using a grid system, with 30-
       jarak antara cross line 300-1.000 meter dan jarak                    1,000 meter distance of cross line and 50-300
       antar lubang bor 50-300 meter, mengikuti jurus dan                   meter drill hole spacing, follow the strike and
       kemiringan (down dip) pelapisan batuan hingga                        dip of coal seam with maximum Depth
       kedalaman maksimal 60-150 meter. Hal ini                             around 60-150 meter. The purpose of grid
       bertujuan untuk memaksimalkan stripping ratio                        system and control maximum Dept for
       (SR) dan kemenerusan batubara. Mengingat                             determine of optimization stripping ratio (SR)
       beberapa data pengeboran lama yang tidak                             and continuity of coal. Considering some of
       dilengkapi dengan geofisika logging lengkap, coal                    the old drilling data has not performed with
       recovery <95% dan ketidaksesuaian interval                           geophysical logging, coal recovery is less than
       batubara drillhole model serta quality perlu                         95%, and there are discrepancies in the coal
       dilakukan infill drilling dan konfirmasi.                            interval of the drillhole model as well as in
                                                                            quality, infill drilling and confirmation need to
                                                                            be carried out.
       Pengeboran yang dilakukan yaitu tipe lubang                          Drilling was conducted with open hole, part
       terbuka (open hole), part coring dan full coring. Unit               coring and full coring type. The drill unit used
       bor yang digunakan adalah rig tipe Jacro-175/200                     are rigs type Jacro-175/200 and type Jacro-
       dan tipe Jacro-300 dengan diameter lubang bor                        300 with 4 inch (diameter 96 mm) drill holes
       (outside) HQ 4 inch (Ǿ 96 mm).                                       (outside) HQ.
       Pengambilan contoh sample batubara bertujuan                         The purpose of sampling of coal is to analyze
       untuk dilakukan analisa kualitas batubara.                           the quality of the coal.


                                           PT. Golden Energy Mines Tbk.
                  Sinar Mas Land Plaza Tower II, 6th Floor Jl. MH. Thamrin No. 51 Kav. 22, Jakarta Pusat 10350
                                      Phone: (62) 21 50186 888 , Fax: (62) 21 3199 0319
                                           Website: www.goldenenergymines.com
Page 5
5.3. Pelaksanaan dan Pengawasan Kegiatan Eksplorasi                      5.3. Implementation and Supervision of
                                                                              Exploration Activities
    Kegiatan pengeboran BSL periode Q4 2025 pada                         Drilling activities of BSL for the period of Q4
    blok Belani dilakukan oleh PT ICE (Indonesia Carbon                  2025 at Block Belani were carried out by PT
    Energy) dengan 3 unit rig di bawah supervisi                         ICE with 3 rig under the supervision of the
    Geologist Section Geology dan Geotech,                               Geologist Section Geology and Geotech, BSL's
    Departemen Mine Planing & Technical Service BSL.                     Mine Planning & Technical Service
                                                                         Department.
    Kegiatan pengeboran Q4 2025 dilakukan dua shift                      Drilling activities on Q4 2025 was conducted 2
    yaitu pagi dan malam dengan target kedalaman                         shifts (day and night shift) with depth target
    lubang bor sebesar 80-150 meter, dengan                              per hole is 80-150 meter complied with safety
    memenuhi standar safety.                                             standard.
    Unit Rig yang digunakan pada kegiatan pengeboran                     Drilling activity used 1 unit of Jacro-175/200
    adalah tipe Jacro-175/200 dan Jacro-300, dengan                      and Jacro-300. Spec of rods pipe is 4 inch (96
    spesifikasi diameter lubang bor (outside) HQ 4 inch                  mm) diameter drill holes (outside) HQ Rods
    (Ǿ 96 mm). Unit rig jacro-300 ini merupakan unit                     type. This Jacro-300 rig unit is designed to
    dengan spesifikasi target kedalaman pengeboran                       achieve a full coring drill depth of up to 150
    full coring hingga 150 meter dan ukuran yang cukup                   meters, and due to its relatively large size,
    besar, sehingga diperlukan unit alat berat                           heavy equipment (such as an excavator or
    (excavator atau Bulldozer) untuk melakukan                           bulldozer) is required to move the unit from
    perpindahan unit dari titik bor satu ke titik bor                    one drill point to another.
    lainnya.                                                             Drill holes that have been finished then
    Lubang bor yang telah selesai dilakukan                              carried out by a pickup collar survey by the
    pengeboran kemudian dilakukan pickup collar                          BSL survey team consisting of 1 surveyor
    survey oleh tim survey BSL yang terdiri dari 1                       coordinator and 2 survey crews.
    koordinator surveyor dan 2 crew survey.



5.4. Kemajuan Eksplorasi                                                 5.4. Drilling Progress
     Selama periode Q4 2025 kegiatan pengeboran                          in Q4 2025 exploration drilling activities in
     eksplorasi di Blok Muara Lakitan telah                              Muara Lakitan Block have completed 15 drill
     menyelesaikan 15 lubang bor. Total kedalaman                        holes. Total drill hole Depth in Q4 2025 were
     lubang bor selama periode Q4 2025 adalah                            1,542.50 meters as detailed in table 1.3.
     1.542,50 meter rincian pada tabel 1.3.
     Pengeboran dilakukan dengan tipe pengeboran                         Drilling was carried out using the partial
     partial coring dan full coring dengan tujuan                        coring and full coring method with the aim of
     mendapatkan sample batubara dan sample                              obtaining coal samples for quality analysis
     batubara untuk dilakukan analisa kualitas dan                       and geotechnical samples for slope stability
     sample geoteknik untuk kestabilan lereng tambang                    analysis of the mine and disposal areas.
     dan disposal.




                                       PT. Golden Energy Mines Tbk.
              Sinar Mas Land Plaza Tower II, 6th Floor Jl. MH. Thamrin No. 51 Kav. 22, Jakarta Pusat 10350
                                  Phone: (62) 21 50186 888 , Fax: (62) 21 3199 0319
                                       Website: www.goldenenergymines.com
Page 6
                      Tabel 1.3 Kemajuan Pengeboran Ekplorasi BSL Periode Q4 2025 /
                       BSL Drilling Exploration Progress for the period of Q4 2025

                                                         Lubang Eksplorasi (m) /
                                                            Exploration Drilling

   Lokasi /        Jumlah                               Total kedalaman (m) /
   Location        lubang /                             Total Depth
                                                                                                     Total (m)
                   Total                                Coring               Full Coring
                   Holes           Open Holes
                                                        (Infill)             (Geotech)
Muara Lakitan      15             942,6                 365,9                234                     1.542,50




5.5. Biaya Eksplorasi                              5.5. Exploration Cost
     Untuk biaya eksplorasi selama periode Q4 2025      The exploration costs for the period of Q4
     adalah sebagai berikut :                           2025 are as follows :

                           Tabel 1.4. Biaya Pengeboran Eksplorasi BSL periode Q4 2025 /
                                     BSL Drilling Cost for the period of Q4 2025

                                                                               Year to Date
              Operating Expense
                                                    Anggaran / Plan (Rp)              Realisasi / Realisation (Rp)
 Biaya Pengeboran BSL / Drilling Cost BSL          Rp. 1.275.723.448,-             Rp. 1.182.048.897,-




                                         PT. Golden Energy Mines Tbk.
                Sinar Mas Land Plaza Tower II, 6th Floor Jl. MH. Thamrin No. 51 Kav. 22, Jakarta Pusat 10350
                                    Phone: (62) 21 50186 888 , Fax: (62) 21 3199 0319
                                         Website: www.goldenenergymines.com

File

File Open PDF
Source IDX
Size0.68 MB
Published12 Jan 2026
Pages6
Characters21,600
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 17 people and organisations named in the text · linked when the evidence is strong

linked org Golden Energy Mines Tbk p.1 ×23
linked org Sinar Mas p.1 ×6
linked org PT Borneo Indobara p.2
possible org PT Bursa Efek Indonesia p.1 ×3
unresolved org Indonesia Stock Exchange p.1
unresolved org PT Golden Energy Mines Tbk Sudin p.1
unresolved person Sudin, SH · Corporate Secretary p.1
unresolved org PT Kuansing Inti Makmur p.2
unresolved org Departemen Survey p.2
unresolved org Departemen SGE p.3
unresolved org Departemen Strategic p.3
unresolved org PT Trisula Kencana Sakti p.4
unresolved org PT Berkat Satria Abadi p.4
unresolved org PT Wahana Rimba Lestari p.4
unresolved org PT Barasentosa Lestari p.4
unresolved org PT ICE p.5
unresolved org Departemen Mine Planing & Technical Service BSL. p.5

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

Other files in this announcement 1

↑↓ select ↵ open ⇧↵ see every result