Back to announcement
20260108_CBPE_Laporan Penggunaan Dana Hasil Penawaran Umum_32018338_lamp1.pdf
Other Text extracted CBPESource file signed link, expires in 15 minutes
Extracted text 3
Page 1 OCR 0.341
“ ewejn.inyjanig EreuO pig 211 Votsyua VNYAB Vania Lg N eng 2119 “Ld uer 80 “Bunpueg Aan Ke Ten PA Manan euepiag 2 962'916'608"L€ 961”916'608' LE 961916 608”LE POL ETS 148 000'005”189'0y bu dala Ta An ena 1 VBO13S19d UBOJaSIAd wWnun WINWN UEJEMLUAG efiay jepow ejaan jepow Yisaag |IseH uesemeuad ehejg USeH yejuung Ta Pan snpyjadsoad Ininuawy (snyyadsoug IninudW Jinyoya 1e33ue1 Sae ON ee ang ag eueg ueeun$383uag | eueg ueeun33uag WINWN UEJEMEUAd JISEH ISESIJEOY IEJIN La Oa aan, Isesjeay Buedudy Sz02 MIAWISIA TE Mid AL VAISVAd VNVNG VALID "Ld | VNYGYId WNWN NYAVMYNIId TISVH VNVG NVYNN9ONJd ISVSINVIY NVYOdVI
Page 2 OCR 0.880
Rekap Biaya Emisi PT. Citra Buana Prasida Tbk. Jumlah Saham IPO 271.250.000 Harga IPO 150 Nilai IPO 40.687.500.000 R Penjamin Pelaksana Emisi Efek PT Panin Sekuritas Tbk 1.250.000.000 1.250.000.000 3,07296 Management Fee 2,0721 843.125.000 Underwriting Fee 0,50096 203.437.500 Selling Fee 0,5001 203.437.500 Biaya Jasa Profesi Penunjang Pasar Modal : Akuntan Publik 390.000.000 390.000.000 0,95916 Konsultan Hukum 324.480.000 324.480.000 0,79746 Notaris 300.000.000 300.000.000 0,73716 Biaya Jasa Lembaga Penunjang Pasar Modal : Biro Administrasi Efek (BAE) 75.000.000 75.000.000 0,18496 Biaya Pencatatan Saham di BEI Jumlah saham yang dicatatkan 1.356.250.000 Harga penawaran umum 150 Nilai Kapitalisasi Saham 203.437.500.000 Pembulatan (ke atas) 204.000.000.000 P1 miliar) x Rp 1juta ILF Maksimal Jumlah " Dikurangi Biaya Pendaftaran Total 125.000.000 Biaya Tahunan Pencatatan (Februari - Desember 2023): (Rp204.000.000.000,- : Rp 1 miliar) x Rp 500 rb 102.000.000 'AALF Maksimal 250.000.000 AALF tahun 2023 (Prorate: Feb - Des 2023) Jumlah 93.500.000 SUB TOTAL 218.500.000 0,53790 y- Biaya pendaftaran di KSEI Pendaftaran Efek 15.000.000 Biaya Tahunan 10.000.000 SUB TOTAL 25.000.000 25.000.000 0,06196 Biaya Pernyataan Pendaftaran di OJK 20.343.750 20.343.750 0,05096 Biaya Lain-Lain (pencetakan, iklan, dan biaya-biaya yang 274.199.954 274.199.954 0,67416 berhubungan dengan hal-hal tersebutus) TOTAL 2.877.523.704 7,07196 Bandung, 08 Januari 2026— “3 PT CITRA BUANA PRASIDA Teu. DidiOmara Direktur Utama
Page 3 OCR 0.839
RINCIAN PENGGUNAAN DANA PENAWARAN UMUM PT. CITRA BUANA PRASIDA TBK PER : 31 DESEMBER 2025 No Kontraktor SPK Pembayaran 5 Lahan 9.956.026.131,00 1 Amung Sutisna 'SPK : 246/XI/CBP/DIR-Pembangunan dan teknik/2022 205.000.000,00 2 Beton Elemenindo Perkasa PT | 248/XII/CBP/DIR-PEMBANGUNAN & TEKNIK/2022 545.480.540,00 040/04/25/CBP-IPO/BDG 162.295.230,00 087/V/CBP/DIR-02/24 74.650.000,00 SPK 144/VI/CBP/DIR-02/25 18.000.000,00 OP 065/06/25/CBP-IPO/BDG 58.065.000,00 5) KA Deddy, ST SPK.245/XI/CBP/DIR-PEMBANGUNAN & TEK/2022 7.000.000,00 088/IV/CBP/DIR-02/2025 8.000.000,00 4 Master Geotesfondasi PT 012/1/CBP/DIR-02/2023 10.750.000,00 5 Non Kontraktor - 295.968.100,00 Instalasi Listrik & Air 28.876.500,00 6 PT. CISANGKAN E 160.599.750,00 OP 044/04/25/CBP-IPO/BDG 74.400.000,00 OP 108/10/25/CBP-IPO/BDG 60.593.750,00 OP 124/11/25/CBP-IPO/BDG 10.710.000,00 7. PT. SELIACIPTA BESTARI LIMA | SPK : 180/SPK/CBP/X/2022 75.000.000,00 SPK : 170/VII/CBP/DIR-02/2024 65.000.000,00 8 Sage Konstruksi Indonesia PT | SPK: 021/11/CBP/DIR-02/2023 5.623.100.000,00 SPK: 040/IN/CBP/DIR-02/2023 903.440.000,00 SPK: 083/V/CBP/DIR-02/2023 7.100.000.000,00 SPK: 199/VIN/CBP/DIR-02/2023 1.949.706.000,00 SPK: 152/VI/CBP/DIR-02/2023 45.998.900,00 SPK: 261/IX/CBP/DIR-02/2023 32.000.000,00 SPK: 086/IV/CBP/DIR-02/2025 6.949.000.000,00 SPK: 124/V/CBP/DIR-02/25 1.575.000.000,00 9 Mitra Solusi Konstruksi CV OP 115/06/23/CBP-IPO/BDG 9.640.000,00 10 |Trisapta Kabel Industri PT OP 119/06/23/CBP-IPO/BDG 169.369.369,00 1 Hasil Sempurna PT SPK: 150/VI/CBP/DIR-02/2023 100.000.000,00 SPK: 093/IV/CBP/DIR-02/2025 684.759.000,00 12 Nanang Sulaeman SPK : 154/VI/CBP/DIR-02/2023 13.500.000,00 15 CV. MANDA ABADI MUKTI SPK: 253/IX/CBP/DIR-02/2023 180.000.000,00 14 (Surat & Ijin PBG Blok D & E 72.072.658,00 15 jElevasi Studio 006/MKTG/CBP-KWS/11/2022 15.000.000,00 106/IM/MKTG/CBP/XII/2024 18.000.000,00 16 Liem Agung 078/07/25/CBP-IPO/BDG 149.000.000,00 17 |Bintang Fajar 085/08/25/CBP-IPO/BDG 12.480.600,00 18 CV. Yuriartha X1/25/B-K/0857 63.063.062 19 |Handiyanto 107/V/CBP/DIR-02/2024 12.000.000 024/11/CBP/DIR-02/2025 10.500.000 20 Sage Konstruksi Indonesia PT | 246/XI/CBP/DIR-02/2025 176.558.214 aa: PLN KWH Meter Baru, SLO & NIDI 129.373.492 TOTAL 37.809.976.296 Bandung, 08 Januari 2026..... Direktur Utama PT. “ig b
Names mentioned 7 people and organisations named in the text · linked when the evidence is strong
unresolved
org
PT CITRA BUANA PRASIDA Teu. DidiOmara
p.2
unresolved
org
PT. CISANGKAN E
p.3
unresolved
org
PT. SELIACIPTA BESTARI LIMA
p.3
unresolved
org
PT OP
p.3
unresolved
org
PT SPK
p.3
Extraction attempts how the parser did, and what it refused
Nothing structured was extracted from this document — the attempts below say why.
No extraction attempted yet.