Skip to content
Back to announcement

20260108_CBPE_Laporan Penggunaan Dana Hasil Penawaran Umum_32018338_lamp1.pdf

Other Text extracted CBPE

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 3

Page 1 OCR 0.341
“

ewejn.inyjanig
EreuO pig
211 Votsyua VNYAB Vania Lg

N eng 2119 “Ld
uer 80 “Bunpueg

Aan Ke Ten PA Manan euepiag
2 962'916'608"L€ 961”916'608' LE 961916 608”LE POL ETS 148 000'005”189'0y bu dala Ta An ena 1

VBO13S19d UBOJaSIAd wWnun WINWN UEJEMLUAG

efiay jepow ejaan jepow Yisaag |IseH uesemeuad ehejg USeH yejuung

Ta Pan snpyjadsoad Ininuawy (snyyadsoug IninudW Jinyoya 1e33ue1 Sae ON
ee ang ag eueg ueeun$383uag | eueg ueeun33uag WINWN UEJEMEUAd JISEH ISESIJEOY IEJIN La Oa aan,
Isesjeay Buedudy
Sz02 MIAWISIA TE Mid

AL VAISVAd VNVNG VALID "Ld | VNYGYId WNWN NYAVMYNIId TISVH VNVG NVYNN9ONJd ISVSINVIY NVYOdVI

Page 2 OCR 0.880
Rekap Biaya Emisi PT. Citra Buana Prasida Tbk.

Jumlah Saham IPO 271.250.000
Harga IPO 150
Nilai IPO 40.687.500.000 R
Penjamin Pelaksana Emisi Efek
PT Panin Sekuritas Tbk 1.250.000.000 1.250.000.000 3,07296
Management Fee 2,0721 843.125.000
Underwriting Fee 0,50096 203.437.500
Selling Fee 0,5001 203.437.500
Biaya Jasa Profesi Penunjang Pasar Modal :
Akuntan Publik 390.000.000 390.000.000 0,95916
Konsultan Hukum 324.480.000 324.480.000 0,79746
Notaris 300.000.000 300.000.000 0,73716
Biaya Jasa Lembaga Penunjang Pasar Modal :
Biro Administrasi Efek (BAE) 75.000.000 75.000.000 0,18496
Biaya Pencatatan Saham di BEI
Jumlah saham yang dicatatkan 1.356.250.000
Harga penawaran umum 150
Nilai Kapitalisasi Saham 203.437.500.000
Pembulatan (ke atas) 204.000.000.000
P1 miliar) x Rp 1juta
ILF Maksimal
Jumlah "
Dikurangi Biaya Pendaftaran
Total 125.000.000
Biaya Tahunan Pencatatan (Februari - Desember 2023):
(Rp204.000.000.000,- : Rp 1 miliar) x Rp 500 rb 102.000.000
'AALF Maksimal 250.000.000
AALF tahun 2023 (Prorate: Feb - Des 2023)
Jumlah 93.500.000
SUB TOTAL 218.500.000 0,53790 y-
Biaya pendaftaran di KSEI
Pendaftaran Efek 15.000.000
Biaya Tahunan 10.000.000
SUB TOTAL 25.000.000 25.000.000 0,06196
Biaya Pernyataan Pendaftaran di OJK 20.343.750 20.343.750 0,05096
Biaya Lain-Lain
(pencetakan, iklan, dan biaya-biaya yang 274.199.954 274.199.954 0,67416
berhubungan dengan hal-hal tersebutus)
TOTAL 2.877.523.704 7,07196
Bandung, 08 Januari 2026—

“3

PT CITRA BUANA PRASIDA Teu.
DidiOmara
Direktur Utama
Page 3 OCR 0.839
RINCIAN PENGGUNAAN DANA PENAWARAN UMUM

PT. CITRA BUANA PRASIDA TBK
PER : 31 DESEMBER 2025

No Kontraktor SPK Pembayaran
5 Lahan 9.956.026.131,00
1 Amung Sutisna 'SPK : 246/XI/CBP/DIR-Pembangunan dan teknik/2022 205.000.000,00
2 Beton Elemenindo Perkasa PT | 248/XII/CBP/DIR-PEMBANGUNAN & TEKNIK/2022 545.480.540,00
040/04/25/CBP-IPO/BDG 162.295.230,00
087/V/CBP/DIR-02/24 74.650.000,00
SPK 144/VI/CBP/DIR-02/25 18.000.000,00
OP 065/06/25/CBP-IPO/BDG 58.065.000,00
5) KA Deddy, ST SPK.245/XI/CBP/DIR-PEMBANGUNAN & TEK/2022 7.000.000,00
088/IV/CBP/DIR-02/2025 8.000.000,00
4 Master Geotesfondasi PT 012/1/CBP/DIR-02/2023 10.750.000,00
5 Non Kontraktor - 295.968.100,00
Instalasi Listrik & Air 28.876.500,00
6 PT. CISANGKAN E 160.599.750,00
OP 044/04/25/CBP-IPO/BDG 74.400.000,00
OP 108/10/25/CBP-IPO/BDG 60.593.750,00
OP 124/11/25/CBP-IPO/BDG 10.710.000,00
7. PT. SELIACIPTA BESTARI LIMA | SPK : 180/SPK/CBP/X/2022 75.000.000,00
SPK : 170/VII/CBP/DIR-02/2024 65.000.000,00
8 Sage Konstruksi Indonesia PT | SPK: 021/11/CBP/DIR-02/2023 5.623.100.000,00
SPK: 040/IN/CBP/DIR-02/2023 903.440.000,00
SPK: 083/V/CBP/DIR-02/2023 7.100.000.000,00
SPK: 199/VIN/CBP/DIR-02/2023 1.949.706.000,00
SPK: 152/VI/CBP/DIR-02/2023 45.998.900,00
SPK: 261/IX/CBP/DIR-02/2023 32.000.000,00
SPK: 086/IV/CBP/DIR-02/2025 6.949.000.000,00
SPK: 124/V/CBP/DIR-02/25 1.575.000.000,00
9 Mitra Solusi Konstruksi CV OP 115/06/23/CBP-IPO/BDG 9.640.000,00
10 |Trisapta Kabel Industri PT OP 119/06/23/CBP-IPO/BDG 169.369.369,00
1 Hasil Sempurna PT SPK: 150/VI/CBP/DIR-02/2023 100.000.000,00
SPK: 093/IV/CBP/DIR-02/2025 684.759.000,00
12 Nanang Sulaeman SPK : 154/VI/CBP/DIR-02/2023 13.500.000,00
15 CV. MANDA ABADI MUKTI SPK: 253/IX/CBP/DIR-02/2023 180.000.000,00
14 (Surat & Ijin PBG Blok D & E 72.072.658,00
15 jElevasi Studio 006/MKTG/CBP-KWS/11/2022 15.000.000,00
106/IM/MKTG/CBP/XII/2024 18.000.000,00
16 Liem Agung 078/07/25/CBP-IPO/BDG 149.000.000,00
17  |Bintang Fajar 085/08/25/CBP-IPO/BDG 12.480.600,00
18 CV. Yuriartha X1/25/B-K/0857 63.063.062
19 |Handiyanto 107/V/CBP/DIR-02/2024 12.000.000
024/11/CBP/DIR-02/2025 10.500.000
20 Sage Konstruksi Indonesia PT | 246/XI/CBP/DIR-02/2025 176.558.214
aa: PLN KWH Meter Baru, SLO & NIDI 129.373.492

TOTAL

37.809.976.296

Bandung, 08 Januari 2026.....

Direktur Utama

PT. “ig b

File

File Open PDF
Source IDX
Size2.97 MB
Published9 Jan 2026
Pages3
Characters4,437
Text sourceOCR
OCR confidence0.687

Names mentioned 7 people and organisations named in the text · linked when the evidence is strong

linked org Citra Buana Prasida Tbk. p.2 ×6
possible org Panin Sekuritas Tbk p.2 ×2
unresolved org PT CITRA BUANA PRASIDA Teu. DidiOmara p.2
unresolved org PT. CISANGKAN E p.3
unresolved org PT. SELIACIPTA BESTARI LIMA p.3
unresolved org PT OP p.3
unresolved org PT SPK p.3

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result