Lampiran 1
Peristiwa Tanah Longsor di Area Proyek PLTA Pakkat
Perihal
Dengan ini kami untuk dan atas nama perusahaan menyampaikan Laporan Informasi atau Fakta Material sebagai
berikut:
Nama Emiten atau Perusahaan Publik PT Kencana Energi Lestari Tbk.
Bidang Usaha Menjalankan usaha jasa dan ketenagalistrikan melalui anak
perusahaan
Telepon +62.21.5890.0791
Faksimili +62.21.386.7686
Alamat Surat Elektronik (email) corporate.secretary@kencanaenergy.com
Tanggal Kejadian 03 Desember 2025
Jenis Informasi atau Fakta Material Peristiwa Tanah Longsor di Area Proyek PLTA Pakkat
Uraian Informasi atau Fakta Material Bahwa sekitar pukul 14.30 WIB, telah terjadi peristiwa tanah
longsor di area proyek PLTA Pakkat yang berlamat di
Kabupaten Humbang Hasundutan, Kecamatan Pakkat,
Sumatra Utara.
Tidak ada korban jiwa maupun luka dalam peristiwa ini.
Perseroan akan menyampaikan informasi tambahan apabila
terdapat perkembangan material terkait hasil investigasi dan
analisis atas peristiwa ini.
Page 2
Dampak kejadian, informasi atau fakta Dampak kejadian, informasi, atau fakta material tersebut
material tersebut terhadap kegiatan terhadap
operasional, hukum, kondisi keuangan,
atau kelangsungan usaha Emiten atau Kegiatan Operasional
Perusahaan Publik Peristiwa ini mengakibatkan PLTA Pakkat untuk sementara
berhenti beroperasi.
Saat ini, Perseroan bersama pihak-pihak terkait masih
melakukan investigasi dan analisis lebih lanjut untuk
mengetahui sejauh mana dampak peristiwa ini terhadap
operasional PLTA Pakkat.
Hukum
Tidak ada dampak secara hukum.
Kondisi Keuangan Perseroan
Perseroan masih melakukan analisis lebih lanjut untuk
mengetahui dampak keuangan dari Peristiwa ini.
Namun dapat disampaikan bahwa Perseroan tidak akan
dikenakan denda oleh PLN karena hasil produksi PLTA Pakkat
sebelum terjadinya peristiwa, telah hampir mencapai 100%
dari ECE dan peristiwa yang terjadi juga merupakan force
majeure sebagaimana dalam PPA.
Disampaikan pula bahwa seluruh aset PLTA Pakkat telah di-
cover oleh asuransi termasuk Business Interruption.
Kelangsungan Usaha Perseroan
Perseroan optimis bahwa peristiwa ini tidak mengganggu
kelangsungan usaha Perseroan.
PLTA Pakkat merupakan salah satu dari 4 proyek PLTA
Perseroan yang telah beroperasi secara komersil, dan proyek-
proyek Perseroan yang lainnya tetap beroperasi secara
normal.
Demikian untuk diketahui.
Hormat Kami,
PT Kencana Energi Lestari Tbk.
Wilson Maknawi
Direktur Utama
PT Kencana Energi Lestari Tbk.
Kencana Tower Lantai 11, Kebon Jeruk Business Park, Jl. Raya Meruya Ilir No.88,
Telepon : +62.21.5890.0791, Fax : +62.21.386.7686, www.kencanaenergy.com
Nama Pengirim Wilson Maknawi
Page 3
Jabatan Direktur Utama
Tanggal dan Waktu 04-12-2025 07:36
Lampiran 1. KI Landslide Pakkat.pdf
Dokumen ini merupakan dokumen resmi PT Kencana Energi Lestari Tbk. yang tidak memerlukan tanda tangan
karena dihasilkan secara elektronik oleh sistem pelaporan elektronik. PT Kencana Energi Lestari Tbk. bertanggung
jawab penuh atas informasi yang tertera didalam dokumen ini.
Page 4
Go To Indonesian Page
Letter / Announcement No. 38/KEL-Corsec/XII/2025
Issuer Name PT Kencana Energi Lestari Tbk.
Issuer Code KEEN
Attachment 1
Subject Landslide Incident in the Pakkat Hydroelectric Power Plant Project Area
The company hereby announce the Material Information or Facts Report as follows
Name of Issuer or Public Company PT Kencana Energi Lestari Tbk.
Business Activities Menjalankan usaha jasa dan ketenagalistrikan melalui anak
perusahaan
Telephone +62.21.5890.0791
Faximile +62.21.386.7686
Email Address corporate.secretary@kencanaenergy.com
Date of Event 03 December 2025
Landslide Incident in the Pakkat Hydroelectric Power Plant
Type of Material Information or Facts Project Area
Description of Material Information or At approximately 2:30 PM WIB, a landslide occurred in the
Facts Pakkat Hydropower Plant (PLTA Pakkat) project area, located
in Pakkat District, Humbang Hasundutan Regency, North
Sumatra.
There were no fatalities or injuries resulting from this incident.
The Company will provide additional information should there
be any material developments related to the results of the
investigation and analysis of this event.
Page 5
Impact of event, material information or The impact of the event, information or material facts on the
facts towards Issuers or Public
Company’s operational activities, legal, Operational Activities
financial condition, or going concern This incident has resulted in the temporary suspension of
operations at PLTA Pakkat.
At present, the Company, together with the relevant parties, is
conducting further investigation and analysis to assess the
extent of the incidents impact on PLTA Pakkat operations.
Law
No impact.
Company Financial Condition
The Company is still conducting further analysis to determine
the financial impact of this Event.
However, it can be confirmed that the Company will not be
subject to penalties from PLN, as the production output of the
Pakkat Hydropower Plant prior to the Event had nearly
reached 100% of the ECE, and the Event is also categorized
as a force majeure under the PPA.
It is also conveyed that all assets of the Pakkat Hydropower
Plant are covered by insurance, including Business
Interruption coverage.
Company Business Continuity
The Company is optimistic that this Event will not disrupt the
Company business continuity.
The Pakkat Hydropower Plant is one of the Company four
hydropower projects that have commenced commercial
operations, and the Company other projects continue to
operate normally.
Thus to be informed accordingly.
Respectfully,
PT Kencana Energi Lestari Tbk.
Wilson Maknawi
Direktur Utama
PT Kencana Energi Lestari Tbk.
Kencana Tower Lantai 11, Kebon Jeruk Business Park, Jl. Raya Meruya Ilir No.88,
Phone : +62.21.5890.0791, Fax : +62.21.386.7686, www.kencanaenergy.com
Sender Name Wilson Maknawi
Function Direktur Utama
Page 6
Date and Time 04-12-2025 07:36
Attachment 1. KI Landslide Pakkat.pdf
This is an official document of PT Kencana Energi Lestari Tbk. that does not require a signature as it was
generated electronically by the electronic reporting system. PT Kencana Energi Lestari Tbk. is fully responsible for
the information contained within this document.
Names mentioned 3 people and organisations named in the text · linked when the evidence is strong
unresolved
person
Wilson Maknawi
· Nama Pengirim
p.2 ×2
unresolved
person
Function
· Direktur Utama
p.5
Extraction attempts how the parser did, and what it refused
Nothing structured was extracted from this document — the attempts below say why.
No extraction attempted yet.