Skip to content
Back to announcement

20251204_KEEN_Laporan Informasi dan Fakta Material_31999687.pdf

Other Text extracted KEEN

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 6

Page 1
Go To English Page

 Nomor Surat                           38/KEL-Corsec/XII/2025

 Nama Perusahaan                       PT Kencana Energi Lestari Tbk.

 Kode Emiten                           KEEN

 Lampiran                              1
                                       Peristiwa Tanah Longsor di Area Proyek PLTA Pakkat
 Perihal


Dengan ini kami untuk dan atas nama perusahaan menyampaikan Laporan Informasi atau Fakta Material sebagai
berikut:

 Nama Emiten atau Perusahaan Publik            PT Kencana Energi Lestari Tbk.

 Bidang Usaha                                  Menjalankan usaha jasa dan ketenagalistrikan melalui anak
                                               perusahaan


 Telepon                                       +62.21.5890.0791

 Faksimili                                      +62.21.386.7686

 Alamat Surat Elektronik (email)               corporate.secretary@kencanaenergy.com


 Tanggal Kejadian                              03 Desember 2025
 Jenis Informasi atau Fakta Material           Peristiwa Tanah Longsor di Area Proyek PLTA Pakkat



 Uraian Informasi atau Fakta Material          Bahwa sekitar pukul 14.30 WIB, telah terjadi peristiwa tanah
                                               longsor di area proyek PLTA Pakkat yang berlamat di
                                               Kabupaten Humbang Hasundutan, Kecamatan Pakkat,
                                               Sumatra Utara.

                                               Tidak ada korban jiwa maupun luka dalam peristiwa ini.

                                               Perseroan akan menyampaikan informasi tambahan apabila
                                               terdapat perkembangan material terkait hasil investigasi dan
                                               analisis atas peristiwa ini.
Page 2
Dampak kejadian, informasi atau fakta       Dampak kejadian, informasi, atau fakta material tersebut
material tersebut terhadap kegiatan         terhadap
operasional, hukum, kondisi keuangan,
atau kelangsungan usaha Emiten atau         Kegiatan Operasional
Perusahaan Publik                           Peristiwa ini mengakibatkan PLTA Pakkat untuk sementara
                                            berhenti beroperasi.


                                            Saat ini, Perseroan bersama pihak-pihak terkait masih
                                            melakukan investigasi dan analisis lebih lanjut untuk
                                            mengetahui sejauh mana dampak peristiwa ini terhadap
                                            operasional PLTA Pakkat.


                                            Hukum
                                            Tidak ada dampak secara hukum.


                                            Kondisi Keuangan Perseroan
                                            Perseroan masih melakukan analisis lebih lanjut untuk
                                            mengetahui dampak keuangan dari Peristiwa ini.

                                            Namun dapat disampaikan bahwa Perseroan tidak akan
                                            dikenakan denda oleh PLN karena hasil produksi PLTA Pakkat
                                            sebelum terjadinya peristiwa, telah hampir mencapai 100%
                                            dari ECE dan peristiwa yang terjadi juga merupakan force
                                            majeure sebagaimana dalam PPA.

                                            Disampaikan pula bahwa seluruh aset PLTA Pakkat telah di-
                                            cover oleh asuransi termasuk Business Interruption.


                                            Kelangsungan Usaha Perseroan
                                            Perseroan optimis bahwa peristiwa ini tidak mengganggu
                                            kelangsungan usaha Perseroan.

                                            PLTA Pakkat merupakan salah satu dari 4 proyek PLTA
                                            Perseroan yang telah beroperasi secara komersil, dan proyek-
                                            proyek Perseroan yang lainnya tetap beroperasi secara
                                            normal.


Demikian untuk diketahui.


Hormat Kami,
PT Kencana Energi Lestari Tbk.




Wilson Maknawi

Direktur Utama




PT Kencana Energi Lestari Tbk.
Kencana Tower Lantai 11, Kebon Jeruk Business Park, Jl. Raya Meruya Ilir No.88,
Telepon : +62.21.5890.0791, Fax : +62.21.386.7686, www.kencanaenergy.com



Nama Pengirim                     Wilson Maknawi
Page 3
Jabatan                           Direktur Utama
Tanggal dan Waktu                 04-12-2025 07:36

Lampiran                         1. KI Landslide Pakkat.pdf


  Dokumen ini merupakan dokumen resmi PT Kencana Energi Lestari Tbk. yang tidak memerlukan tanda tangan
karena dihasilkan secara elektronik oleh sistem pelaporan elektronik. PT Kencana Energi Lestari Tbk. bertanggung
                          jawab penuh atas informasi yang tertera didalam dokumen ini.
Page 4
Go To Indonesian Page

 Letter / Announcement No.            38/KEL-Corsec/XII/2025

 Issuer Name                          PT Kencana Energi Lestari Tbk.

 Issuer Code                          KEEN

 Attachment                           1

 Subject                              Landslide Incident in the Pakkat Hydroelectric Power Plant Project Area


The company hereby announce the Material Information or Facts Report as follows

 Name of Issuer or Public Company             PT Kencana Energi Lestari Tbk.

 Business Activities                          Menjalankan usaha jasa dan ketenagalistrikan melalui anak
                                              perusahaan

 Telephone                                    +62.21.5890.0791

 Faximile                                      +62.21.386.7686

 Email Address                                corporate.secretary@kencanaenergy.com


 Date of Event                                03 December 2025

                                              Landslide Incident in the Pakkat Hydroelectric Power Plant
 Type of Material Information or Facts        Project Area

 Description of Material Information or       At approximately 2:30 PM WIB, a landslide occurred in the
 Facts                                        Pakkat Hydropower Plant (PLTA Pakkat) project area, located
                                              in Pakkat District, Humbang Hasundutan Regency, North
                                              Sumatra.

                                              There were no fatalities or injuries resulting from this incident.

                                              The Company will provide additional information should there
                                              be any material developments related to the results of the
                                              investigation and analysis of this event.
Page 5
 Impact of event, material information or    The impact of the event, information or material facts on the
 facts towards Issuers or Public
 Company’s operational activities, legal,    Operational Activities
 financial condition, or going concern       This incident has resulted in the temporary suspension of
                                             operations at PLTA Pakkat.


                                             At present, the Company, together with the relevant parties, is
                                             conducting further investigation and analysis to assess the
                                             extent of the incidents impact on PLTA Pakkat operations.


                                             Law
                                             No impact.


                                             Company Financial Condition
                                             The Company is still conducting further analysis to determine
                                             the financial impact of this Event.

                                             However, it can be confirmed that the Company will not be
                                             subject to penalties from PLN, as the production output of the
                                             Pakkat Hydropower Plant prior to the Event had nearly
                                             reached 100% of the ECE, and the Event is also categorized
                                             as a force majeure under the PPA.

                                             It is also conveyed that all assets of the Pakkat Hydropower
                                             Plant are covered by insurance, including Business
                                             Interruption coverage.

                                             Company Business Continuity
                                             The Company is optimistic that this Event will not disrupt the
                                             Company business continuity.

                                             The Pakkat Hydropower Plant is one of the Company four
                                             hydropower projects that have commenced commercial
                                             operations, and the Company other projects continue to
                                             operate normally.


Thus to be informed accordingly.


Respectfully,
PT Kencana Energi Lestari Tbk.




Wilson Maknawi

Direktur Utama




PT Kencana Energi Lestari Tbk.
Kencana Tower Lantai 11, Kebon Jeruk Business Park, Jl. Raya Meruya Ilir No.88,
Phone : +62.21.5890.0791, Fax : +62.21.386.7686, www.kencanaenergy.com



Sender Name                          Wilson Maknawi

Function                             Direktur Utama
Page 6
Date and Time                       04-12-2025 07:36

Attachment                         1. KI Landslide Pakkat.pdf


     This is an official document of PT Kencana Energi Lestari Tbk. that does not require a signature as it was
 generated electronically by the electronic reporting system. PT Kencana Energi Lestari Tbk. is fully responsible for
                                    the information contained within this document.

File

File Open PDF
Source IDX
Size0.01 MB
Published4 Dec 2025
Pages6
Characters10,305
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 3 people and organisations named in the text · linked when the evidence is strong

linked org Kencana Energi Lestari Tbk. · Nama Perusahaan p.1 ×36
unresolved person Wilson Maknawi · Nama Pengirim p.2 ×2
unresolved person Function · Direktur Utama p.5

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result