PT Bumi Resources Minerals Tbk.
Paparan Publik Tahunan
5 November 2025
SG000UM7_AP_0810
Page 2
Struktur Perusahaan
PT Bumi Resources Minerals Tbk
99,90%
PT Multi Capital
96,97% 100% 98,04 % 49%
1,96 %
PT Citra Palu Minerals International Minerals PT Bumi Sumberdaya PT Dairi Prima Mineral
(Gold) Company LLC Semesta (Zinc & Lead)
80%
78% 60,86%
SGQ Singapore
PT Gorontalo Minerals PT Andalan Anugerah
Projects Holding
(Copper & Gold) Sekarbumi
Company Pte, Ltd
90% 99,67%
PT Linge Mineral
PT Suma Heksa Sinergi 10 %
Resources
(Gold)
(Gold)
Notes:
PT Aneka Tambang Tbk (ANTM) memiliki 20% saham di PT Gorontalo Minerals.
China Nonferrous Metal Industry’s Foreign Engineering & Construction Co Ltd. (NFC China) memiliki 51% saham di PT Dairi Prima Mineral.
SG000UM7_AP_0810
Page 3
Portfolio Aset
Linge Mineral Resources Gorontalo Minerals
Stake: 60,99%. Stake: 80%
Type: Gold. Type: Copper & Gold.
Reserve (100%): 2.3 mio ton ore. Reserve (100%): 105.4 mio ton (Sungai Mak).
Grade: 1.8 g/ton Au. Grade: 0.7% Cu, 0.33 g/ton Au.
Resource (100%): 6.8 mio ton ore. Resource (100%) : 392.3 mio ton (Sungai Mak & Cabang
Medan Grade: 1.58 g/ton Au. Kiri, Motomboto North, Motomboto East & Kayubulan)
Grade: 0.49% Cu, 0.43 g/ton Au.
Celebes Sea
Duri
Kalimantan
Molucca Sea
INDONESIA
Java
Sea Citra Palu Minerals
Stake: 96.97%
Banda Sea Type: Gold.
Indian
JAKARTA
Reserves (100%): 34.1 mio ton ore (Poboya).
Ocean
Grade: 3.2 g/ton Au.
Dairi Prima Mineral Sumbawa
Timor Sea
Resource (100%): 40.2 mio ton ore (Poboya).
Grade: 3.5 g/ton Au.
Stake: 49%. Suma Heksa Sinergi
Type: Zinc & lead
Reserve (100%): 11 mio ton ore (Anjing Hitam & Lae Jahe). Stake: 80%.
Grade: 11.5% Zn, 6.8% Pb. Type: Gold.
Resource (100%): 25 mio ton ore (Anjing Hitam, Lae Jahe, Reserve (100%): 18.4 mio ton ore.
Base Camp). Grade: 1.07 g/ton Au.
Grade: 10.1% Zn, 6.0% Pb. Resource (100%): 75.3 mio ton ore.
Grade: 0.85 g/ton Au.
Source: BRM.
SG000UM7_AP_0810
2
Page 4
Manajemen BRM
Agoes Projosasmito Adrian Wicaksono Charles Daniel gobel
• Berpengalaman lebih dari 31 tahun di pasar • Berpengalaman lebih dari 12 tahun
modal dan menjabat sebagai Direktur Utama • Pendiri dari PT Tri Karya
di sector pertambangan. Pernah
di Danareksa Securities, Wakil Direktur Teslatama (Distributor aksesoris bekerja di: Amman Mineral Group,
Utama di DBS Securities, Direktur di
Merincorp Securities.
kelistrikan untuk saluran PT Bormindo Nusantara, PT
• Berpengalam lebih dari 16 tahun di industry
transmisi & gardu induk Ancora Indonesia Resources Tbk.
Pertambangan yang mana saat ini menjabat tegangan tinggi ).
sebagai Komisaris Utama di Amman • Berpengalaman lebih dari 10 tahun
Mineral International, wakil Direktur di • Berpengalaman 5 tahun di pasar di Industri Pasar Modal. Pernah
Amman Mineral Nusa Tenggara, Direktur
Utama di Ithaca Resources dan sebagai
modal sebagai Analyst di sektor bekerja di: PT Danasakti securities
Direktur
Utama Komisaris Utama di Maduma Coal Energy. Direktur Perbankan, minyak sawit and Direktur Indonesia, Latham Capital
• Anggota Dewan Ekonomi – Komite Standar mineral batubara di PT Nusantara Partners Ltd. Arapima Fund L.P.,
Profesi Pasar Modal. Capital Sekuritas (Singapur),
Herwin Wahyu Hidayat Muhammad Sulthon Fuad Helmy
• Berpengalaman lebih dari 19 tahun • Berpengalaman lebih dari 18 tahun • Berpengalaman lebih dari 16 tahun
di bidang keuangan dan Investor sebagai Head of Legal Counsel sebagai Bisnis Analis dan Chief
Relations dalam industri minyak & dan Corporate Secretary di sektor Finance Officer di industri
gas dan pertambangan. industri pertambangan. pertambangan.
• Pernah bekerja lebih dari 6 tahun • Pernah bekerja sebagai Senior • Berpengalaman lebih dari 7 tahun
sebagai Corporate Bankers di ABN Legal Officer di PT Arutmin dalam konsultasi keuangan dan
Amro dan Citibank. Indonesia selama 5 tahun. sektor perbankan dari Bank
Danamon dan BC Nusantara.
Direktur Direktur Direktur
Adhika Andrayudha Bakrie Adika Aryasthana Bakrie
• Berpengalaman lebih dari 9 tahun di • Berpengalaman sebagai Assistant
industry minyak sawit sebagai Direktur Investment Analyst di Alta Verde
di Bakrie Sumatra Plantations. Group (California, USA) pada
tahun 2010.
• Pernah bekerja lebih dari 7 tahun di
industry batubara sebagai Direktur di • Pernah bekerja sebegai Chief
Arutmin Indonesia.
Executive of Service & Support
• Memiliki pengalaman 5 tahun (2015 – Division di bisnis Perkebunan
2020) sebagai Direktur di Kaltim Prima Kelapa Sawit di tahun 2016.
Direktur Direktur
Coal.
SG000UM7_AP_0810
3
Page 5
Manajemen di Anak Usaha & Tim Operasional
Damar Kusumanto Yan Adriansyah Agus Sitindaon
• Berpengalaman lebih dari 227 tahun
Berpengalaman lebih dari 26 tahun • Berpengalaman lebih dari 17
sebagai metallurgy di industri mineral
sebagai Senior Ahli Geologi dan tahun sebagai teknik geotechnical processing baik keahlian teknis
pimpinan proyek eksplorasi dari & hydrogeological di berbagai maupun pengalaman operasional.
pekerjaanya di Aneka Tambang , perusahaan tambang terbuka.
Austindo Resources, Mine Serve • Berpengalaman dalam penyelesaian &
International (Freeport Grup). pengoperasian semua peralatan terkait
• Pernah bekerja di : Arutmin pabrik pengolahan mineral.
Indonesia, Adaro Indonesia,
Competent Person di Indonesia Kaltim Prima Coal, Amman • Pernah bekerja di : Freeport Indonesia,
Direktur
Direktur Utama untuk melaporkan hasil eksplorasi Direktur
PT Citra Palu Minerals
Mineral Nusa Tenggara, dan PT Citra Palu Minerals Berkat Maju Teknik, Wilson Walton
(mineral emas dan pengikutnya). PT Citra Palu Minerals
Berau Coal. (Gold project) Indonesia, dan Central Trust Indonesia
(Gold project) (Gold project)
Tarkelin Karo Karo Purba Indra Yogasurya Rimayansyah Radianto Arifin
Berpengalaman lebih dari 30 tahun • Berpengalaman lebih dari 22 tahundi
sebagai Geologi & Mine • Berpengalaman lebih dari 15 bidang Keuangan. Sebelumnya
development di tambang emas.. tahun sebagai ahli Geologi di pernah bekerja di : AP Investment, PT
Bank Permata Tbk, ABN Amro, Bank
proyek tembagan dan emas di
Pernah bekerja di : PT Archi BCA, Petro Energi Group,, PT Citra
Gorontalo, Sulawesi. Arafiq Medika.
Indonesia, Mining Industry Indonesia
(Mind Id) PT Newmont Minahasa
• Berpengalaman 3 tahun sebagai • Berpengalaman lebih dari 8 tahundi
Raya, Indomuro Kencana (Aurora
Chief Executive Officer gold), PT Avocet Bolaang Sr. Manager ahli Geologi di proyek bijih besi Chief Financial Officer industry pertambangan. Sebelumnya
PT Gorontalo Minerals Mongondow, PT Meares Soputan
Geology & Development
di Mauritania & Madagscar PT Suma Heksa Sinergi bekerja di: Petro Energy Group, PT
(Copper & Gold Project)
Mining.
PT Gorontalo Minerals
(Afrika). (Gold Project - Kerta) Iluva Berkat Sinergi, PT Energi
(Copper & Gold Project) Mineral Sukses
Robert Edward Gelson Tutus Irmawan Djama Budiawan Halim
• Berpengalaman lebih dari 15
• Berpengalaman lebih dari 17
• Berpengalaman lebih dari 15 tahun sebagai Teknik
tahun sebagai Teknik
tahun sebagai Teknik Pertambangan di
Pertambangan di
Pertambangan di pertambangan terbuka dan
pertambangan terbuka dan
pertambangan terbuka dan pertambangan bawah tanah.
pertambangan bawah tanah.
pertambangan bawah tanah.
• Sebelumnya bekerja di: Sebelumnya bekerja di: Barrick
• Sebelumnya bekerja di: Rio Newcrest Mining (Nusa Gold, West Africa Resources,
V.P Technical Services V.P
Chief Underground Tinto, Newcrest Mining, Halmahera), Aneka Tambang Underground Operations Doray Mineral & Silverlake
Mining Officer PT Bumi Resources Minerals
PT Bumi Resources Minerals Sandfire Resources. tbk, Barminco, Trakindo Utama.
PT Bumi Resources Minerals Resources.
SG000UM7_AP_0810
4
Page 6
Citra Palu Minerals (CPM)
Tambang Emas & Perak BLOK 1 - POBOYA (MINERAL RESOURCES / SUMBERDAYA MINERAL)
Tonase Grade Metal Content
Prospect Classification
Mton Au (g/t) Ag (g/t) Au (Oz) Ag (Oz)
Memiliki hak konsesi pertambangan seluas 85.180 hektar
Indicated 6.8 2.0 6.2 431,000 1,363,000
di Sulawesi Tengah dan Sulawesi Selatan. RIVER
REEF Inferred 0.0 4.1 16.1 1,000 3,000
Vein - Open
Pit Sub Total 6.8 2.0 6.2 431,000 1,366,000
Izin konstruksi dan produksi telah disetujui oleh
RIVER Indicated 18.7 5.8 12.8 3,514,000 7,684,000
Pemerintah Indonesia pada November 2017 dengan REEF Inferred 0.9 8.7 12.5 259,000 372,000
periode konstruksi 3 tahun dan periode produksi 30 Vein -
Underground Sub Total 19.6 6.0 12.8 3,774,000 8,057,000
tahun (hingga tahun 2050).
Total Indicated 25.5 4.8 11.0 3,945,000 9,407,000
Pabrik emas Carbon in Leach – 1 (CIL) saat ini sedang Total Inferred 0.9 8.7 12.5 260,000 375,000
ditingkatkan kapasitas pengolahannya dari 500 ton Total River Reef 26.4 4.9 11.1 4,205,000 9,422,000
menjadi 2.000 ton bijih per hari (estimasi penyelesaian di HILL REEF Indicated 7.1 0.9 2.5 209,000 577,000
Inferred 0.5 0.6 1.4 10,000 23,000
Oktober 2026). Vein Zone -
Open Pit Sub Total 7.6 0.9 2.5 219,000 600,000
Indicated 5.8 0.6 1.3 104,100 249,000
Pabrik emas CIL – 2 saat ini memproses rata-rata 4.500 HILL REEF
Inferred 0.4 0.5 1.0 6,000 12,000
Stockwork
ton bijih per harinya. Gneiss –
Open Pit Sub Total 6,.2 0.6 1.3 110,000 262,000
Total Indicated 12.9 0.8 2.0 313,000 826,000
PT Macmahon Indonesia (anak usaha Macmahon
Total Inferred 0.9 0.6 1.2 16,000 35,000
Holdings Limited) beroperasi sebagai kontraktor
Total Hill Reef 13.8 0.7 1.9 329,000 861,000
tambang mineral terbuka dan bawah tanah di Palu.
Total Resources 40.2 3.5 8.0 4,534,000 10,283,300
BLOK 1 - POBOYA (MINERAL RESERVES / CADANGAN MINERAL)
Produksi Emas BRMS
Tonase Grade Metal Content
FY2020 FY2021 FY2022 FY 2023 FY2024 9M 2025 Location Classification
Au Ag
Mton Au (Oz) Ag (Oz)
Produksi 73 Kg 139 Kg 174 Kg 724 Kg 2,021 Kg 1,759 kg (g/t) (g/t)
Emas 2,271 oz 4,328 oz 5,415 oz 23,270 oz 64,983 oz 56,552 oz RIVER REEF
(Open Pit) Probable 5.7 1.7 7.4 300,000 1,400,000
HILL REEF
(Open Pit) Probable 9.6 0.79 2.2 240,000 670,000
• The JORC standard Resource was completed by a Competent Person - Mr. Dmitry Pertel of AMC Total Open Pit 15.3 1.1 4.1 540,000 2,100,000
Consultants Pty Ltd In 2024
• The JORC standard Reserve was completed by a Competent Person - Mr. Glen Williamson & Simon Probable 2.5 4.5 9.8 360,000 790,000
RIVER REEF
krebs of AMC Consultants Pty Ltd In 2024 (Underground)
Probable 16.3 5.0 10.9 2,600,000 5,700,000
SG000UM7_AP_0810
Total Underground 18.8 4.9 10.8 3,000,000 6,500,000
Total Reserves 34.1 3.2 7.8 3,540,000 Source:
8,600,000
BRM.
5
Page 7
Citra Palu Minerals (CPM)
Produksi Emas (Oz) Rata-Rata Kadar Emas (g/t)
56,552
1.5
45,366
1.4
9M 2024 9M 2025 9M 2024 9M 2025
Produksi Perak (Oz) Rata-Rata Kadar Perak (g/t)
160,367 5.3
4.1
82,108
9M 2024 9M 2025 9M 2024 9M 2025
SG000UM7_AP_0810
6
Page 8
Citra Palu Minerals (CPM)
Harga Jual Emas ($/Oz) Harga Jual Perak ($/Oz)
3,156 31.65
2,347 24.35
9M 2024 9M 2025 9M 2024 9M 2025
Mining Activity Metrics (k ton) Stripping Ratio
7.0
7,121
6,932
3.8
1,858
987
9M 2024 9M 2025
SG000UM7_AP_0810
Ore Mined Waste Production 9M 2024 9M 2025
7
Page 9
Citra Palu Minerals
Area Konsesi
Kontrak Karya Blok 1 Poboya
Block IV Block V
Anggasan Moutong
Block VI
Roto
Block I
Poboya
Block II
Winehi
SG000UM7_AP_0810
8
Page 10
Citra Palu Minerals (CPM)
Pabrik emas CIL – 2 (rata-rata pengolahan bijih 4.500 ton per hari)
Cyclone to separate the fine ores (-75 um)
Jaw crusher Sag mill and Ball mill Cyclone
from the coarse ores (+75 um)
Carbon in leach tanks Acid Wash, Elution & Carbon regeneration Dore Bullion
SG000UM7_AP_0810
Source: Citra Palu Minerals 9
Page 11
Citra Palu Minerals (CPM)
Area Pabrik emas Carbon In Leach (CIL) di Blok-1 (Poboya, Palu)
Vein
SG000UM7_AP_0810
10
Page 12
Citra Palu Minerals
Proses Pengolahan dalam Pabrik emas Carbon in Leach (CIL)
Gold Processing Flowsheet
SG000UM7_AP_0810
11
Page 13
Citra Palu Minerals
Konstruksi Pabrik emas Heap Leach di Blok 1 (Poboya, Palu)
Konstruksi Fasilitas Adsorption, Desorption, and Recovery (ADR)
Fasilitas Carbon in Column (CIC)
12
SG000UM7_AP_0810
Source: Citra Palu Minerals.
12
Page 14
Citra Palu Minerals (CPM)
Area Pabrik Emas Heap Leach di Blok-1 (Poboya, Palu)
Gneiss
SG000UM7_AP_0810
13
Page 15
Citra Palu Minerals (CPM)
Aktivitas Penambangan Terbuka (Macmahon)
Aktivitas Penambangan oleh Kontraktor Macmahon
Aktivitas Penambangan oleh Kontraktor Macmahon
SG000UM7_AP_0810
Source: Citra Palu Minerals
14
Page 16
Citra Palu Minerals (CPM)
Konstruksi Tambang Bawah Tanah (Macmahon)
Konstruksi Portal & Terowongan Tambang Bawah Tanah
Konstruksi Portal & Terowongan Tambang Bawah Tanah
SG000UM7_AP_0810
Source: Citra Palu Minerals
15
Page 17
Citra Palu Minerals (CPM)
Konstruksi Tambang Bawah Tanah (Macmahon)
Konstruksi Shaft Sink
Equipment Kibble Compressor & Air
Receiver
Single Deck Stage Ventilation Van
SG000UM7_AP_0810
Source: Citra Palu Minerals
16
Page 18
Citra Palu Minerals (CPM)
Konstruksi Tambang Bawah Tanah (Macmahon)
Konstruksi Shaft Sink
Excavation Shaft Shaft Lining
SG000UM7_AP_0810
Source: Citra Palu Minerals
17
Page 19
Citra Palu Minerals (CPM)
Konstruksi Tambang Bawah Tanah (Macmahon)
PASTE PLANT
DAMS
SHAFT
SINK
SG000UM7_AP_0810
18
Page 20
Gorontalo Minerals (GM)
Tambang Tembaga & Emas
Tonnage
Site CoG Cu (%) Au (g/t) Ag (g/t)
(Million)
Memiliki hak konsesi Kontrak Karya untuk Sungai Mak 0.2 g/t Au & 0.2 % Cu 165.1 0.55 0.30 1.49
pertambangan seluas 24.995 hektar yang terletak di Cabang Kiri 0.2 g/t Au & 0.2 % Cu 151.0 0.40 0.55 -
kabupaten Bone Bolango, Provinsi Gorontalo. Motomboto North 0.5 g/t Au 4.0 1.04 2.57 55.34
Motomboto East 0.5 g/t Au 6.1 0.33 1.12 29.70
Kayubulan 0.3 % Cu 66.2 0.52 0.29 -
Izin Konstruksi dan Produksi disetujui oleh Pemerintah Total Resources 392.3 0.49 0.43 1.65
pada Februari 2019 dengan periode konstruksi 3 tahun
Metal Grade Metal Content
dan periode produksi 30 tahun (hingga tahun 2052). Range Tonnage
Ore Type Cu Au Ag Cu Au Ag Class
%Cu (Million)
(%) g/t g/t (kton) (koz) (koz)
Low Grade 0.2-0.45 37 0.32 0.17 1.02 93 121 871
Saat ini, 3 rig pengeboran beroperasi di lokasi tambang
Cabang Kiri East untuk pekerjaan eksplorasi. Medium Grade 0.45-0.08 37.4 0.61 0.31 1.57 183 239 1,426
Probable
High Grade > 0.80 31 1.27 0.54 2.39 337 399 1,986
Total Reserves 105.4 0.7 0.33 1.62 613 759 4,283
Pada akhir tahun 2026, sekitar 6 rig pengeboran akan
beroperasi di lokasi Cabang Kiri East, Cabang Kiri North, Location
dan Cabang Kiri South Ridge.
Hasil pengeboran, termasuk informasi terbaru mengenai
sumber daya dan cadangan mineral, diperkirakan akan
diumumkan pada tahun 2027.
• The JORC, KCMI standard Reserve was completed by Independent consultant - Iwan
Munajat (CPI-019; AusIMM 306293) in 2014.
• The KCMI standard Resource was completed by The Competent Person – Heru Pratomo
(CPI-027) & Dedy Hendrawan (CPI–018) in 2013.
Source: BRM.
SG000UM7_AP_0810
19
Page 21
Gorontalo Minerals
Infrastruktur & Aktivitas Pengeboran
Aktivitas Pengeboran di Cabang Kiri (Projek Tembaga) Aktivitas Pengeboran di Motomboto (Projek Emas)
Area Coreshed Base Camp
SungaiMak
Sungai Mak Tombulilato
SG000UM7_AP_0810
Source: Gorontalo Minerals
20
Page 22
Suma Heksa Sinergi (SHS) – Kerta Project
Tambang Emas & Perak
Overview Kerta - Reserves / Cadangan*
Tonnage Grade Metal Content
Prospect Classification
Proyek Kerta memiliki Izin Usaha Pertambangan (Mton) Au (g/t) Ag (g/t) Au (oz) Ag (oz)
(“IUP”) untuk konsesi tambang seluas 7.291 hektar Cisadang Central Probable 11.8 1.07 14.76 406,800 5,611,800
yang berlokasi di Lebak, Banten. Cisadang West Probable 6.6 1.07 14.72 227,500 3,130,500
Total Reserves 18.4 1.07 14.75 634,300 8,742,300
Izin Lingkungan sudah disetujui oleh Pemerintah
pada bulan Mei 2019. Kerta - Resources / Sumberdaya*
Tonnage Grade Metal Content
Prospect Classification
Studi Kelayakan di Proyek Kerta sudah disetujui (Mton) Au (g/t) Ag (g/t) Au (oz) Ag (oz)
oleh Pemerintah pada bulan Juni 2019. Indicated 14.5 1.01 14.05 469,000 6,549,600
Cisadang Central
Inferred 6.5 0.97 13.13 201,700 2,743,700
(Upper Domain)
Izin Operasi Produksi disetujui oleh Pemerintah Sub Total 21.0 1.00 13.77 670,700 9,293,300
pada bulan November 2019 dengan periode Indicated 3.0 1.01 11.36 96,800 1,095,600
Cisadang Central
produksi 20 tahun (sampai 2039). Inferred 20.0 0.76 8.77 488,500 5,639,000
(Lower Domain)
Sub Total 23.0 0.79 9.11 585,300 6,734,600
Aktivitas eksplorasi dalam bentuk infill drilling Indicated 11.9 0.93 13.81 359,900 5,283,400
Cisadang
untuk menambah sumber daya & cadangan mineral Inferred 19.4 0.71 10.92 440,900 6,810,700
West
Sub Total 31.3 0.79 12.02 800,800 12,094,100
di lokasi tambang Cisadang West & Cisadang
Total Indicated 29.1 0.98 13.68 925,700 12,928,600
Central.
Total Inferred 45.9 0.77 10.30 1,131,100 15,193,400
Total Resources 75.3 0.85 11.62 2,056,800 28,122,000
• The KCMI standard Resources was completed by Competent Person – Ronald Sibarani
(PERHAPI 9100137,012) in 2016,
• The KCMI standard Reserve was completed by Competent Person – Iwan Munajat (CPI019,
AusIMM:306293) in 2016,
• The values in this table have been reported to appropriate significant figures; therefore, there
may be discrepancies in the totaled values
SG000UM7_AP_0810
21
Page 23
Suma Heksa Sinergi (SHS)
Infrastuktur, Coreshed & aktivitas Pengeboran
Coreshed Aktivitas Pengeboran
Penyimpanan Bahan Bakar Kantor
SG000UM7_AP_0810
Source: Suma Heksa Sinergi
22
Page 24
Linge Mineral Resources (LMR)
Tambang Emas & Perak
Linge Abong Gold Project - RESERVE
Overview
Tonnage Grade Metal Content
Clarification
(million) Au (g/t) Ag (g/t)
Linge Mineral Resouces memiliki Izin Au (Oz) Ag (Oz)
Proven 0.66 1.88 7.40 35.782 141.000
Usaha Pertambangan (“IUP”) untuk Probable 1.66 1.76 6.98 84.841 335.908
Total Reserve 2.32 1.80 7.10 120.624 476.908
konsesi tambang seluas 36.420 hektar
Linge Abong Gold Project - RESOURCE
yang berlokasi di Linge, Aceh. Tonnage Grade Metal Content
Prospect Classification
(Million) Au (g/t) Ag (g/t) Au (Oz) Ag (Oz)
Projek pengembangan meliputi: Inferred 2.39 1.54 6.77 118,785 521,136
Bulan Indicated 2.09 1.8 6.77 120,855 455,676
Aktivitas pengeboran, survei Measured 0.73 1.95 7.48 45,603 175,179
Inferred 0.48 1.2 8.3 18,408 127,376
elektromagnetik, tes metalurgi, Bintang 1 Indicated 0.29 1.32 8.97 12,208 82,935
Measured 0.1 1.36 8.7 4,268 27,231
pekerjaan desain tambang, dan
Inferred 0.65 1.06 6.94 22,142 145,531
persetujuan studi kelayakan. Bintang 2 Indicated 0.07 1.24 4.94 2,684 10,658
Measured 0.01 0.92 2.91 153 484
Total Resource 6.8 1.58 7.07 345,107 1,154,207
Izin Analisis Mengenai Dampak R
Location
Lingkungan (AMDAL) telah disetujui
Pemerintah pada bulan September
2025
Saat ini dalam proses untuk
mendapatkan persetujuan Pemerintah
PT LMR
untuk izin Operasi Produksi (20
tahun).
- The JORC and KCMI/ SNI standars Reserve and Resource was
complete by PT Mamberamo Mineral Service (PT MMS) in 2019.
SG000UM7_AP_0810
23
Sumber : Linge Mineral Resources
Page 25
Linge Mineral Resources (LMR)
Aktivitas Pengeboran dan Coreshed
Coreshed Core sampling
Aktivitas Pengeboran Aktivitas Pengeboran
SG000UM7_AP_0810
24
Page 26
Dairi Prima Mineral (DPM)
Tambang Seng & Timah Hitam
Sites Combined Reserves
Dairi merupakan tambang seng dengan kualitas yang
Proven 4.95 Mt at 14.8% Zn, 9.1% Pb
tinggi yang terletak di Sumatera Utara dan akan Anjing Hitam
dikembangkan dengan operasi penambangan bawah Probable 0.90 Mt at 11.3% Zn, 7.0% Pb
tanah (konsesi tambang seluas 24.636 Ha).
Lae Jahe Probable 5.20 Mt at 8.4% Zn, 4.5% Pb
Studi Kelayakan Proyek Anjing Hitam telah disetujui TOTAL RESERVES 11.05 Mt at 11.5% Zn, 6.8% Pb
pada tahun 2015.
Sites Combined Minerals Resources
Izin Produksi telah disetujui oleh Pemerintah pada
Desember 2017 dengan periode produksi selama 30 Anjing Hitam 8.10 Mt at 14.6% Zn, 9.1% Pb
tahun (sampai tahun 2047).
Lae Jahe 16.20 Mt at 8.2% Zn, 4.5% Pb
Tingkat deposit seng terbaik ketiga di Dunia (Grade Base Camp 0.80 Mt at 5.0% Zn, 5.0% Pb
11,5% Zn, 6,8% Pb). TOTAL RESOURCE 25.10 Mt at 10.1% Zn, 6.0% Pb
Saat ini dalam masa konstruksi fasilitas infrastruktur
dan finalisasi pendanaan untuk kegiatan
penambangan di lokasi tambang Anjing Hitam.
• Standarisasi sumberdaya dan cadangan JORC telah diselesaikan oleh CSA Global
(Australia) pada Okt 2010 dan Mining Plus Pty. Ltd pada Feb 2011
SG000UM7_AP_0810
25
Page 27
Dairi Prima Mineral (DPM)
Konstruksi Portal Tambang Bawah Tanah
Konstruksi Portal Tambang Bawah Tanah
1 2
3 4
SG000UM7_AP_0810
26
Page 28
Dairi Prima Mineral (DPM)
Infrastruktur & Bangunan
Infrastruktur di Lapangan
Kantor Sidiangkat Gudang
Base Camp
SG000UM7_AP_0810
27
Page 29
Dairi Prima Mineral (DPM)
Peralatan Berat Tambang Bawah Tanah
Peralatan Berat Tambang Bawah Tanah
(Mobile Crane, Mine Trucks, LHD, Jumbo Drill)
SG000UM7_AP_0810
28
Page 30
KINERJA KEUANGAN & PRODUKSI
Increase
9M 2024 9M 2025
(YoY)
Pendapatan $ 108,479,036 $ 183,579,054 69%
Beban Usaha $ 28,558,344 $ 69,717,506 144%
Laba Bersih $ 16,432,920 $ 37,616,293 129%
9M 2024 9M 2025
45,366 oz 56,552 oz
Produksi Emas 25%
1,411 kg 1,759 kg
Harga Penjualan Emas $ 2,347 /oz $ 3,156 /oz 34%
Catatan :
1. Di Q1 2025, terdapat Biaya Lain-Lain sebesar $7.5 juta yang terdiri dari penghapusan peralatan pabrik carbon in leach ke-1
yang sudah usang terkait dengan peningkatan kapasitas pabrik.
2. Di Q2 2025, terdapat Biaya Lain-Lain sebesar $ 6.5 juta yang terdiri dari penghapusan proyek eksplorasi bauksit di masa lampau.
SG000UM7_AP_0810
29
Page 31
SG000UM7_AP_0810
Terima Kasih
30
Names mentioned 49 people and organisations named in the text · linked when the evidence is strong
unresolved
org
PT Multi Capital
p.2
unresolved
org
PT Citra Palu Minerals
p.2 ×12
unresolved
org
PT Bumi Sumberdaya
p.2
unresolved
org
PT Dairi Prima Mineral
p.2 ×4
unresolved
org
LLC
p.2
unresolved
org
PT Gorontalo Minerals
p.2 ×4
unresolved
org
PT Andalan Anugerah Projects Holding
p.2
unresolved
org
PT Linge Mineral
p.2
unresolved
org
PT Suma Heksa Sinergi
p.2 ×2
unresolved
org
Construction Co Ltd.
p.2
unresolved
org
PT Dairi Prima Mineral. SG
p.2
unresolved
org
PT Tri Karya
p.4
unresolved
person
Teslatama
· Direktur
p.4
unresolved
org
PT Bormindo Nusantara
p.4
unresolved
org
PT Danasakti
p.4
unresolved
org
PT Arutmin
p.4
unresolved
org
Investment Analyst
· Direktur
p.4
unresolved
org
PT Citra Palu Minerals Mineral Nusa Tenggara
p.5
unresolved
org
PT Citra Palu Minerals Berau Coal.
p.5
unresolved
org
PT Archi
p.5
unresolved
org
PT Citra
p.5
unresolved
org
PT Newmont Minahasa
p.5
unresolved
org
PT Meares Soputan Geology
p.5
unresolved
org
PT Macmahon Indonesia
p.6
unresolved
org
Holdings Limited
p.6
unresolved
person
Dmitry Pertel
p.6
unresolved
org
Consultants Pty Ltd
p.6
unresolved
person
Glen Williamson
p.6
unresolved
org
AMC Consultants Pty Ltd
p.6
unresolved
org
PT LMR
p.24
unresolved
org
PT Mamberamo Mineral Service
p.24
unresolved
org
PT MMS
p.24
unresolved
org
Mining Plus Pty. Ltd
p.26
Extraction attempts how the parser did, and what it refused
Nothing structured was extracted from this document — the attempts below say why.
No extraction attempted yet.