Back to announcement
Pertamina Geothermal Energy 30 September 2025.pdf
Financial statement Text extracted PGEOSource file signed link, expires in 15 minutes
Extracted text 128
Page 1
PT PERTAMINA GEOTHERMAL ENERGY TBK dan entitas anaknya/and its subsidiaries Laporan keuangan konsolidasian interim yang tidak diaudit tanggal 30 September 2025 dan untuk periode sembilan bulan yang berakhir pada tanggal tersebut Unaudited interim consolidated financial statements as of September 30, 2025 and for the nine-month period then ended
Page 2
The original consolidated financial statements included herein
are in the Indonesian language.
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
LAPORAN KEUANGAN KONSOLIDASIAN INTERIM UNAUDITED INTERIM CONSOLIDATED FINANCIAL
YANG TIDAK DIAUDIT TANGGAL STATEMENTS AS OF SEPTEMBER 30, 2025 AND
30 SEPTEMBER 2025 DAN UNTUK PERIODE FOR THE NINE-MONTH PERIOD THEN ENDED
SEMBILAN BULAN YANG BERAKHIR PADA
TANGGAL TERSEBUT
Daftar Isi Table of Contents
Lampiran/
Schedule
Surat Pernyataan Direksi Statement of the Board of Directors
Laporan Posisi Keuangan Consolidated Statement of
Konsolidasian 1/1 - 3 Financial Position
Laporan Laba Rugi dan Penghasilan Consolidated Statement
Komprehensif Lain of Profit or Loss and
Konsolidasian 2/1 - 2 Other Comprehensive Income
Laporan Perubahan Ekuitas Consolidated Statement of
Konsolidasian 3 Changes in Equity
Laporan Arus Kas Consolidated
Konsolidasian 4 Statement of Cash Flows
Catatan atas Laporan Keuangan Notes to the Consolidated
Konsolidasian 5/1 - 118 Financial Statements
***************************
Page 3
PERTAMINA
GEOTHERMAL ENERGY
SURAT PERNYATAAN DIREKSI TENTANG/
STATEMENT OF THE BOARD OF DIRECTORS REGARDING
TANGGUNG JAWAB ATAS THE RESPONSIBILITY FOR
LAPORAN KEUANGAN KONSOLIDASIAN INTERIM UNAUDITED INTERIM CONSOL/DA TED FINANCIAL
YANG TIDAK DIAUDIT TANGGAL STATEMENTS AS OF SEPTEMBER 30, 2025 AND
30 SEPTEMBER 2025 DAN UNTUK PERIODE FOR THE NINE-MONTH PERIOD THEN ENDED
SEMBILAN BULAN YANG BERAKHIR PADA
TANGGAL TERSEBUT
PT PERTAMINA GEOTHERMAL ENERGY TBK DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Kami yang bertanda tangan di bawah ini: We, the undersigned:
1. Nama Yulfi Hadi 1. Name Yulfi Hadi
Alamat Kantor JI. Medan Merdeka Timur 11-13 Office Address JI. Medan Merdeka Timur
Jakarta 10110 11-13, Jakarta 10110
Alamat Domisili JI. Adhyaksa VII/M-3 Address of Domicile JI. Adhyaksa VII/M-3
RT 003, RW 005 Lebak Bulus RT 003, RW 005 Lebak
Jakarta Selatan Bu/us, Jakarta Selatan
Telepon 021 - 39833222 Telephone 021 - 39833222
Jabatan Direktur Utama Position President Director
2. Nama Yurizki Rio 2. Name Yurizki Rio
Alamat Kantor JI. Medan Merdeka Timur 11-13 Office Address JI. Medan Merdeka Timur
Jakarta 10110 11-13, Jakarta 10110
Alamat Domisili JI. Cikini Bintaro F.G?-7, Address of Domicile JI. Cikini Bintaro F. G7-7
Jurangmangu Barat, Pondok Jurangmangu Barat,
Aren, Tangerang Selatan Pondok Aren, Tangerang
Selatan
Telepon 021 - 39833222 Telephone 021 - 39833222
Jabatan Direktur Keuangan Position Finance Director
menyatakan bahwa: declare that:
1. Kami bertanggung jawab atas penyusunan dan 1. We are responsible for the preparation and
penyajian laporan keuangan konsolidasian interim presentation of the accompanying interim
PT Pertamina Geothermal Energy Tbk dan entitas consolidated financial statements of PT Pertamina
anaknya (secara kolektif disebut sebagai "Grup") Geothermal Energy Tbk and its subsidiaries
terlampir; (collectively referred to as the "Group'J;
2. Laporan keuangan konsolidasian interim Grup 2. The accompanying interim consolidated financial
terlampir telah disusun dan disajikan sesuai dengan statements of the Group have been prepared and
Standar Akuntansi Keuangan di Indonesia; presented in accordance with Indonesian Financial
Accounting Standards;
3. a. Semua informasi dalam laporan keuangan 3. a. All information in accompanying interim
konsolidasian interim Grup telah dimuat secara consolidated financial statements of the Group
lengkap dan benar; have been fully disclosed in a complete and truthful
manner;
b. Laporan keuangan konsolidasian interim Grup b. The accompanying interim consolidated financial
tidak mengandung informasi atau fakta material statements of the Group do not contain any
yang tidak benar dan tidak menghilangkan incorrect information or material fact, nor do they
informasi atau fakta material; dan omit any information or material fact; and
4. Kami bertanggung jawab atas sistem pengendalian 4. We are responsible for the internal control system of
internal Grup. the Group.
Demikian pernyataan ini dibuat dengan sebenarnya.
Yulfi Hadi
Direktur Utama I President Director
Kantor Pusat )
---t..;r-t-ia-flertal'iiina, Tower Pertamax, Lantai 7
JI. Medan Merdeka Timur No. 11-13, Gambir
Jakarta 10110 Indonesia
T +62 21 398 33 222 F +62 21 398 33 230
Page 4
The original consolidated financial statements included herein are in
the Indonesian language.
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 1/1 Schedule
LAPORAN POSISI KEUANGAN INTERIM CONSOLIDATED STATEMENT OF
KONSOLIDASIAN INTERIM FINANCIAL POSITION
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar,
kecuali dinyatakan lain) unless otherwise stated)
30 September
(Tidak Diaudit)/
September 30, 31 Desember/
Catatan/ (Unaudited), December 31,
Notes 2025 2024
ASET ASSETS
ASET LANCAR CURRENT ASSETS
Kas dan setara kas 3e,3r,5,26e 628.123 655.191 Cash and cash equivalents
Kas yang dibatasi
penggunaannya 3e, 3r, 26e, 37 420 237 Restricted cash
Piutang usaha 3g,3r,6a Trade receivables
- Pihak yang berelasi 3f,26f 159.344 124.627 Related parties -
- Pihak ketiga 3.427 3.498 Third parties -
Piutang lain-lain 3g,3r,6b Other receivables
- Pihak yang berelasi 3f,26g 2.224 4.041 Related parties -
- Pihak ketiga 57 98 Third parties -
Persediaan, bersih 3h,7 29.981 18.486 Inventories, net
Pajak dibayar di muka 25b 524 - Prepaid tax
Pajak pertambahan nilai (“PPN”) Reimbursable
yang dapat ditagihkan value added tax
kembali - bagian lancar 25a 7.086 17.175 (“VAT”) - current portion
Biaya dibayar di muka 8 325 122 Prepayments
Aset lain-lain, bersih 13a, 37 273 5.080 Other assets, net
JUMLAH ASET LANCAR 831.784 828.555 TOTAL CURRENT ASSETS
ASET TIDAK LANCAR NON-CURRENT ASSET
Kas yang dibatasi
penggunaannya 3e, 3r, 26e 67 185 Restricted cash
Piutang lain-lain pihak Other receivables
yang berelasi 3f,3r,6b,26g 7.021 7.529 related parties
Aset tetap, bersih 3i,3j,9 1.986.558 2.024.607 Fixed assets, net
Aset hak guna, bersih 10 3.617 4.215 Right-of-use assets, net
Investasi pada ventura bersama 3z,11 12.070 12.093 Investment in joint ventures
PPN yang dapat ditagihkan Reimbursable
kembali - bagian tidak lancar 25a 99.503 98.460 VAT - non-current portion
Aset keuangan yang dinilai pada Financial assets measures at
nilai wajar melalui pendapatan fair value through other
komprehensif lain 3r,12,29,30 21.716 21.716 comprehensive income
Aset lain-lain, bersih 13b 42 42 Other assets, net
JUMLAH ASET TIDAK TOTAL NON-CURRENT
LANCAR 2.130.594 2.168.847 ASSETS
JUMLAH ASET 2.962.378 2.997.402 TOTAL ASSETS
Catatan atas laporan keuangan konsolidasian terlampir The accompanying notes to the consolidated financial statements
merupakan bagian yang tidak terpisahkan dari form an integral part of these
laporan keuangan konsolidasian secara keseluruhan. consolidated financial statements.
Page 5
The original consolidated financial statements included herein are in
the Indonesian language.
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 1/2 Schedule
LAPORAN POSISI KEUANGAN INTERIM CONSOLIDATED STATEMENT OF
KONSOLIDASIAN INTERIM FINANCIAL POSITION
TANGGAL 30 SEPTEMBER 2025 (lanjutan) AS OF SEPTEMBER 30, 2025 (continued)
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar,
kecuali dinyatakan lain) unless otherwise stated)
30 September
(Tidak Diaudit)/
September 30, 31 Desember/
Catatan/ (Unaudited), December 31,
Notes 2025 2024
LIABILITAS DAN EKUITAS LIABILITIES AND EQUITY
LIABILITAS LIABILITIES
LIABILITAS JANGKA PENDEK CURRENT LIABILITIES
Utang usaha 3k,3r,14 Trade payables
- Pihak yang berelasi 3f,26h 872 2.234 Related parties -
- Pihak ketiga 69.410 94.561 Third parties -
Utang lain-lain pihak Other payables
pihak berelasi 3f,3k,3r,26i 7.581 10.137 related parties
Pinjaman jangka panjang yang
akan jatuh tempo dalam Current maturities
satu tahun 3l,3r,26j 18.671 15.172 of long-term loans
Liabilitas sewa yang akan jatuh Current maturities
tempo dalam satu tahun 3r,10 1.645 1.402 of lease liabilities
Utang pajak 3p,25c 13.404 5.755 Taxes payable
Biaya yang masih harus dibayar 3r,15,26k 55.126 88.053 Accrued expenses
Imbalan kerja jangka pendek 3n,17a 13.789 9.694 Short-term employee benefits
Pendapatan tangguhan 360 288 Deferred revenue
JUMLAH LIABILITAS TOTAL CURRENT
JANGKA PENDEK 180.858 227.296 LIABILITIES
LIABILITAS JANGKA NON-CURRENT
PANJANG LIABILITIES
Liabilitas pajak Deferred tax
tangguhan, bersih 3p,25e 22.966 21.890 liabilities, net
Liabilitas sewa -
setelah dikurangi bagian
yang jatuh tempo Lease liabilities, net of
dalam satu tahun 3r,10 1.508 2.549 current maturity
Utang obligasi 3r,16 398.948 398.643 Bonds payable
Pinjaman jangka panjang
setelah dikurangi bagian
yang jatuh tempo Long-term loans, net of
dalam satu tahun 3l,3r,26j 343.031 328.047 current maturities
Imbalan kerja jangka panjang 3n,17b 8.354 9.019 Long-term employee benefits
Kewajiban jangka panjang lainnya 3n,17c 1.725 1.206 Other long-term liabilities
JUMLAH LIABILITAS TOTAL NON-CURRENT
JANGKA PANJANG 776.532 761.354 LIABILITIES
JUMLAH LIABILITAS 957.390 988.650 TOTAL LIABILITIES
Catatan atas laporan keuangan konsolidasian terlampir The accompanying notes to the consolidated financial statements
merupakan bagian yang tidak terpisahkan dari form an integral part of these
laporan keuangan konsolidasian secara keseluruhan. consolidated financial statements.
Page 6
The original consolidated financial statements included herein are in
the Indonesian language.
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 1/3 Schedule
LAPORAN POSISI KEUANGAN INTERIM CONSOLIDATED STATEMENT OF
KONSOLIDASIAN INTERIM FINANCIAL POSITION
TANGGAL 30 SEPTEMBER 2025 (lanjutan) AS OF SEPTEMBER 30, 2025 (continued)
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar,
kecuali dinyatakan lain) unless otherwise stated)
30 September
(Tidak Diaudit)/
September 30, 31 Desember/
Catatan/ (Unaudited), December 31,
Notes 2025 2024
LIABILITAS DAN EKUITAS LIABILITIES AND EQUITY
(lanjutan) (continued)
EKUITAS EQUITY
Ekuitas yang dapat Equity attributable
diatribusikan kepada to owners of
pemilik entitas induk the parent entity
Modal saham Share capital
Modal dasar – 124.184.568.000 Authorized – 124,184,568,000
saham dengan nilai nominal Rp500 shares with par value of Rp500
pada 30 September 2025 dan as of September 30, 2025 and
31 Desember 2024 (dalam nilai penuh) December 31, 2024 (in full amount)
Modal ditempatkan dan disetor Issued and paid-up capital
41.808.086.596 saham pada 41,808,086,596 shares
tanggal 30 September 2025 as of September 30, 2025
(2024: 41.508.024.149 saham) 18a 1.483.282 1.474.494 (2024: 41,508,024,149 shares)
Tambahan modal disetor 3v,3y,18b 207.885 188.293 Additional paid in capital
Pendapatan komprehensif Other comprehensive income:
lainnya: pengukuran kembali remeasurement of fair value
nilai wajar atas investasi ekuitas 14.328 14.328 on equity investment
Saldo laba 18c Retained earnings
- Ditentukan penggunaannya 191.532 167.438 Appropriated -
- Belum ditentukan penggunaannya 108.398 164.615 Unappropriated -
Jumlah ekuitas yang dapat Total equity attributable
diatribusikan kepada to owners of
pemilik entitas induk 2.005.425 2.009.168 the parent entity
Kepentingan non-pengendali 19 (437) (416) Non-controlling interest
JUMLAH EKUITAS 2.004.988 2.008.752 TOTAL EQUITY
JUMLAH LIABILITAS TOTAL LIABILITIES
DAN EKUITAS 2.962.378 2.997.402 AND EQUITY
Catatan atas laporan keuangan konsolidasian terlampir The accompanying notes to the consolidated financial statements
merupakan bagian yang tidak terpisahkan dari form an integral part of these
laporan keuangan konsolidasian secara keseluruhan. consolidated financial statements.
Page 7
The original consolidated financial statements included herein are in
the Indonesian language.
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 2/1 Schedule
LAPORAN LABA RUGI DAN PENGHASILAN INTERIM CONSOLIDATED STATEMENTS OF PROFIT OR LOSS
KOMPREHENSIF LAIN KONSOLIDASIAN INTERIM UNTUK AND OTHER COMPREHENSIVE INCOME
PERIODE SEMBILAN BULAN YANG BERAKHIR PADA FOR THE NINE-MONTH ENDED
TANGGAL 30 SEPTEMBER 2025 SEPTEMBER 30, 2025
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar,
kecuali dinyatakan lain) unless otherwise stated)
30 September 30 September
(Tidak Diaudit)/ (Tidak Diaudit)/
September 30, September 30,
Catatan/ (Unaudited), (Unaudited),
Notes 2025 2024
PENDAPATAN 3m,20,26b 318.861 306.021 REVENUE
BEBAN POKOK
PENDAPATAN DAN COST OF REVENUE
BEBAN LANGSUNG AND OTHER DIRECT
LAINNYA 3m,21,26c,37 (140.216) (120.014) COST
LABA BRUTO 178.645 186.007 GROSS PROFIT
Beban umum dan General and administrative
administrasi 22,37 (21.165) (15.025) expenses
Pendapatan lain-lain, bersih 24a,37 1.118 814 Other income, net
LABA USAHA 158.598 171.796 OPERATING PROFIT
Pendapatan keuangan 23a,37 22.041 24.756 Finance income
(Rugi)/laba selisih kurs 24b,37 (10.222) 13.059 (Loss)/gain foreign exchange
Bagian laba dari ventura bersama 11 (23) 390 Share of profit in joint ventures
Beban keuangan 23b (22.875) (16.795) Finance costs
LABA SEBELUM BEBAN PROFIT BEFORE
PAJAK PENGHASILAN 147.519 193.206 INCOME TAX EXPENSE
BEBAN PAJAK
PENGHASILAN 3p,25d (43.263) (59.236) INCOME TAX EXPENSE
LABA TAHUN BERJALAN 104.256 133.970 PROFIT FOR THE YEAR
Penghasilan komprehensif lain Other comprehensive income
Pos-pos yang tidak akan Items that will not be
direklasifikasi ke laba rugi reclassified to profit or loss
Pengukuran kembali atas Net remeasurement of
liabilitas imbalan pasti neto - - defined benefits liability
Keuntungan/(kerugian) nilai wajar aset Net fair value gain/(loss) on
bersih atas investasi ekuitas - - equity investment
PENGHASILAN
KOMPREHENSIF LAIN OTHER COMPREHENSIVE
NETO SETELAH PAJAK - - INCOME, NET OF TAX
JUMLAH PENGHASILAN
KOMPREHENSIF TOTAL COMPREHENSIVE
TAHUN BERJALAN 104.256 133.970 INCOME FOR THE YEAR
Catatan atas laporan keuangan konsolidasian terlampir The accompanying notes to the consolidated financial statements
merupakan bagian yang tidak terpisahkan dari form an integral part of these
laporan keuangan konsolidasian secara keseluruhan. consolidated financial statements.
Page 8
The original consolidated financial statements included herein are in
the Indonesian language.
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 2/2 Schedule
LAPORAN LABA RUGI DAN PENGHASILAN INTERIM CONSOLIDATED STATEMENTS OF PROFIT OR LOSS
KOMPREHENSIF LAIN KONSOLIDASIAN INTERIM UNTUK AND OTHER COMPREHENSIVE INCOME
PERIODE SEMBILAN BULAN YANG BERAKHIR PADA FOR THE NINE-MONTH ENDED
TANGGAL 30 SEPTEMBER 2025 (lanjutan) SEPTEMBER 30, 2025 (continued)
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar,
kecuali dinyatakan lain) unless otherwise stated)
30 September 30 September
(Tidak Diaudit)/ (Tidak Diaudit)/
September 30, September 30,
Catatan/ (Unaudited), (Unaudited),
Notes 2025 2024
LABA TAHUN BERJALAN
YANG DAPAT PROFIT FOR THE YEAR
DIATRIBUSIKAN KEPADA: ATTRIBUTABLE TO:
Pemilik entitas induk 104.277 133.993 Owners of the parent entity
Kepentingan non-pengendali (21) (23) Non-controlling interest
Jumlah 104.256 133.970 Total
TOTAL PENGHASILAN
KOMPREHENSIF TAHUN TOTAL COMPREHENSIVE
BERJALAN YANG DAPAT INCOME FOR THE YEAR
DIATRIBUSIKAN KEPADA: ATTRIBUTABLE TO:
Pemilik entitas induk 104.277 133.993 Owners of the parent entity
Kepentingan non-pengendali (21) (23) Non-controlling interest
Jumlah 104.256 133.970 Total
LABA PER SAHAM DASAR BASIC EARNINGS PER SHARE
DIATRIBUSIKAN KEPADA ATTRIBUTABLE TO
PEMILIK ENTITAS INDUK OWNERS OF THE PARENT
(NILAI PENUH) 3x, 28 0,0025 0,0032 ENTITY (FULL AMOUNT)
LABA PER SAHAM DILUSIAN DILUTIVE EARNINGS PER SHARE
DIATRIBUSIKAN KEPADA ATTRIBUTABLE TO
PEMILIK ENTITAS INDUK OWNERS OF THE PARENT
(NILAI PENUH) 3x, 28 0,0025 0,0032 ENTITY (FULL AMOUNT)
Catatan atas laporan keuangan konsolidasian terlampir The accompanying notes to the consolidated financial statements
merupakan bagian yang tidak terpisahkan dari form an integral part of these
laporan keuangan konsolidasian secara keseluruhan. consolidated financial statements.
Page 9
The original consolidated financial statements included herein are in the Indonesian language.
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 3 Schedule
LAPORAN PERUBAHAN EKUITAS KONSOLIDASIAN INTERIM INTERIM CONSOLIDATED STATEMENTS OF CHANGES IN EQUITY
UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2025 DAN 2024 SEPTEMBER 30, 2025 AND 2024
DAN TAHUN YANG BERAKHIR PADA 31 DESEMBER 2024 AND THE YEAR ENDED DECEMBER 31, 2024
(Disajikan dalam ribuan dolar Amerika Serikat, kecuali dinyatakan lain) (Expressed in thousands of United States dollar, unless otherwise stated)
Tambahan
modal Pendapatan
Modal disetor/ komprehensif Saldo laba/Retained earnings Kepentingan
saham/ Additional lainnya/Other Ditentukan Belum ditentukan non-pengendali/
Catatan/ Share paid- comprehensive penggunaannya/ penggunaannya/ Non-controlling Jumlah ekuitas/
Notes capital in capital income Appropriated Unappropriated interest Total equity
Saldo 1 Januari 2024 1.470.520 183.525 19.140 132.269 166.026 (224) 1.971.256 Balance as of January 1, 2024
Penerbitan saham/modal disetor 3.974 1.183 - - - - 5.157 Shares issuance/paid in capital
Kompensasi berbasis saham 18a,18b - 3.585 - - - - 3.585 Share-based compensation
Pengukuran kembali nilai wajar Remeasurement of fair value on
atas investasi ekuitas - - (4.812) - - - (4.812) equity investment
Kerugian komprehensif lain Net other comprehensive loss
atas imbalan pasti neto - - - - 1.664 - 1.664 of defined benefit
Dividen 3u,27 - - - - (128.400) - (128.400) Dividens
Alokasi cadangan lainnya 18c - - - 35.169 (35.169) - - Other reserved allocations
Laba tahun berjalan - - - - 160.494 (192) 160.302 Profit for the year
Saldo 31 Desember 2024 1.474.494 188.293 14.328 167.438 164.615 (416) 2.008.752 Balance as of December 31, 2024
Saldo 1 Januari 2024 1.470.520 183.525 19.140 132.269 166.026 (224) 1.971.256 Balance as of January 1, 2024
Penerbitan saham/modal disetor 3.872 1.148 - - - - 5.020 Shares issuance/paid in capital
Kompensasi berbasis saham - 1.977 - - - - 1.977 Share-based compensation
Dividen 3u,27 - - - - (128.400) - (128.400) Dividends
Alokasi cadangan lainnya 18c - - - 35.169 (35.169) - - Other reserved allocations
Laba tahun berjalan - - - - 133.993 (23) 133.970 Profit for the year
Saldo 30 September 2024 Balance as of September 30, 2024
(Tidak diaudit) 1.474.392 186.650 19.140 167.438 136.450 (247) 1.983.823 (Unaudited)
Saldo 31 Desember 2024 1.474.494 188.293 14.328 167.438 164.615 (416) 2.008.752 Balance as of December 31, 2024
Penerbitan saham/modal disetor 8.788 8.903 - - - - 17.691 Shares issuance/paid in capital
Kompensasi berbasis saham - 10.689 - - - - 10.689 Share-based compensation
Dividen 3u,27 - - - - (136.400) - (136.400) Dividends
Alokasi cadangan lainnya 18c - - - 24.094 (24.094) - - Other reserved allocations
Laba tahun berjalan - - - - 104.277 (21) 104.256 Profit for the year
Saldo 30 September 2025 Balance as of September 30, 2025
(Tidak diaudit) 1.483.282 207.885 14.328 191.532 108.398 (437) 2.004.988 (Unaudited)
Catatan atas laporan keuangan konsolidasian terlampir merupakan bagian yang tidak The accompanying notes to the consolidated financial statements form an integral
terpisahkan dari laporan keuangan konsolidasian secara keseluruhan. part of these consolidated financial statements.
Page 10
The original consolidated financial statements included herein are in
the Indonesian language.
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 4 Schedule
LAPORAN ARUS KAS KONSOLIDASIAN INTERIM INTERIM CONSOLIDATED STATEMENTS OF CASH FLOWS
UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR FOR THE NINE-MONTH PERIOD ENDED
PADA TANGGAL 30 SEPTEMBER 2025 SEPTEMBER 30, 2025
(Disajikan dalam ribuan dolar Amerika Serikat, kecuali (Expressed in thousands of United States dollar,
dinyatakan lain) unless otherwise stated)
30 September 30 September
(Tidak Diaudit)/ (Tidak Diaudit)/
September 30 September 30
Catatan/ (Unaudited), (Unaudited),
Notes 2025 2024
ARUS KAS DARI CASH FLOWS FROM
AKTIVITAS OPERASI OPERATING ACTIVITIES
Penerimaan kas dari pelanggan 581.470 586.494 Cash receipts from customers
Penerimaan kas dari pendapatan bunga 23.589 26.477 Cash receipts interest income
Pembayaran kas kepada pemasok (374.137) (351.256) Cash payments to suppliers
Pembayaran kas atas pajak penghasilan (33.121) (52.098) Cash payments of income tax
Pembayaran kas kepada karyawan (24.267) (24.733) Cash payments to employees
Pembayaran kas Cash payments
antar anak perusahaan (1.467) - between subsidiaries
Penerimaan kas Cash receipts
antar anak perusahaan - 4.376 between subsidiaries
Pembayaran premi asuransi Cash payments of insurance
dan klaim lainnya (2.256) (886) premium and others claim
Penerimaan kas Cash receipts from
dari aktivitas operasi lainnya 17.418 3.098 other operating activities
Arus kas bersih yang diperoleh Net cash flows provided by
dari aktivitas operasi 187.229 191.472 operating activities
ARUS KAS DARI AKTIVITAS CASH FLOWS FROM
INVESTASI INVESTING ACTIVITIES
Penerimaan dividen kas dari aktivitas Cash dividends receipts from
investasi lainnya 1.994 2.574 other investment activities
Penambahan investasi di anak perusahaan Additional investment in
dan perusahaan asosiasi - (100) subsidiaries and associates
Penambahan kas Additions in
yang dibatasi penggunaannya (183) - restricted cash
Penambahan aset tetap (68.988) (78.596) Additions to fixed assets
Arus kas bersih yang digunakan Net cash flows used in
untuk aktivitas investasi (67.177) (76.122) investing activities
ARUS KAS DARI AKTIVITAS CASH FLOWS FROM
PENDANAAN FINANCING ACTIVITIES
Penerimaan atas penerbitan saham 18.288 4.636 Cash receipt from shares issuance
Pembayaran kas atas dividen (136.400) (128.400) Cash paid of dividend
Pembayaran pinjaman jangka panjang (17.848) (7.456) Cash payments of long term loan
Pembayaran beban keuangan (13.548) (14.663) Cash payments of financial expense
Pembayaran liabilitas sewa 10 (1.222) (1.224) Payments of lease liabilities
Arus kas bersih yang digunakan untuk Net cash flows used in
aktivitas pendanaan (150.730) (147.107) in financing activities
NET DECREASE
PENURUNAN NETO CASH AND CASH
KAS DAN SETARA KAS (30.678) (31.757) EQUIVALENTS
CASH AND CASH
SALDO KAS DAN SETARA EQUIVALENTS AT THE
KAS PADA AWAL TAHUN 655.191 677.717 BEGINNING OF THE YEAR
EFEK PERUBAHAN EFFECT OF EXCHANGE RATE
NILAI KURS PADA CHANGES ON CASH AND
KAS DAN SETARA KAS 3.610 11.687 CASH EQUIVALENTS
CASH AND CASH
SALDO KAS DAN SETARA EQUIVALENTS AT THE
KAS PADA AKHIR TAHUN 628.123 657.647 END OF THE YEAR
Catatan atas laporan keuangan konsolidasian terlampir The accompanying notes to the consolidated financial statements
merupakan bagian yang tidak terpisahkan dari form an integral part of these
laporan keuangan konsolidasian secara keseluruhan. consolidated financial statements.
Page 11
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/1 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
1. INFORMASI UMUM 1. GENERAL INFORMATION
a. Perusahaan a. Company
(i) Profil Perusahaan (i) Company Profile
PT Pertamina Geothermal Energy PT Pertamina Geothermal Energy (the
(“Perusahaan”) didirikan berdasarkan Akta “Company”) was established on
Notaris No. 10 tanggal 12 Desember 2006 December 12, 2006, by Notarial Deed No.
oleh Marianne Vincentia Hamdani, S.H. 10 of Marianne Vincentia Hamdani, S.H.
Akta pendirian Perusahaan telah mendapat The deed of establishment was approved by
pengesahan dari Menteri Hukum dan Hak the Ministry of Law and Human Rights in
Asasi Manusia dengan surat keputusan No. decision letter No. W7-00089.HT.01.01-
W7-00089.HT.01.01-TH.2007 tanggal 3 TH.2007 dated January 3, 2007, and was
Januari 2007 serta telah diumumkan dalam published in the State Gazette No. 29
Berita Negara No. 29 Tambahan No. 3467 Supplement No. 3467 dated
tanggal 10 April 2007. April 10, 2007.
Anggaran Dasar Perusahaan telah The Company's Articles of Association have
mengalami beberapa kali perubahan. undergone several changes. The latest
Perubahan Anggaran Dasar yang terakhir amendments are stated in Deed Number
dituangkan dalam Akta Nomor 33 tanggal 33, dated August 28, 2025 with notification
28 Agustus 2025 serta telah mendapat receipt from the Minister of Law and Human
penerimaan pemberitahuan dari Menteri Rights of the Republic of Indonesia via letter
Hukum dan Hak Asasi Manusia Republik No. AHU-AH.01.09-0331109, dated August
Indonesia melalui surat No. AHU-AH.01.09- 28, 2025.
0331109 tanggal 28 Agustus 2025.
Perusahaan bergerak di bidang panas bumi The Company was established to engage
dari sisi hulu dan atau sisi hilir baik di dalam in geothermal activities, including
maupun di luar negeri serta kegiatan usaha in the upstream and/or downstream sectors,
lain yang terkait atau menunjang kegiatan in Indonesia and abroad, and other related
usaha di bidang panas bumi tersebut. or supporting business activities in the field
Perusahaan mulai beroperasi secara of geothermal energy. The Company
komersial pada tanggal 3 Januari 2007. started its commercial operations on
January 3, 2007.
Pendirian Perusahaan merupakan tindak The Company’s establishment is related to
lanjut dari diterbitkannya Undang-undang Law No. 22 of 2001, dated November 23,
No. 22 Tahun 2001 tanggal 23 November 2001, regarding Oil and Gas, and
2001 tentang Minyak dan Gas Bumi dan Government Regulation No. 31 of 2003,
Peraturan Pemerintah No. 31 Tahun 2003 dated June 18, 2003, regarding the
tanggal 18 Juni 2003 tentang Pengalihan transformation of Perusahaan
Bentuk Perusahaan Pertambangan Minyak Pertambangan Minyak dan Gas Bumi
dan Gas Bumi Negara (PERTAMINA, Negara (PERTAMINA, the “former
selanjutnya disebut ”Pertamina Lama”) Pertamina Entity”) into PT Pertamina
menjadi PT Pertamina (Persero) (Persero) (”Pertamina”).
(”Pertamina”).
Page 12
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/2 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
1. INFORMASI UMUM (lanjutan) 1. GENERAL INFORMATION (continued)
a. Perusahaan (lanjutan) a. Company (continued)
(i) Profil Perusahaan (lanjutan) (i) Company Profile (continued)
Berdasarkan ketentuan Pasal 7 Peraturan According to Article 7 of Government
Pemerintah No. 31 Tahun 2003 tentang Regulation No. 31 of 2003, regarding the
pengalihan bentuk Pertamina Lama transformation of the former Pertamina
menjadi Perusahaan Perseroan (Persero), Entity into a limited liability company,
dalam jangka waktu paling lama dua tahun Pertamina should transfer all its geothermal
sejak Pertamina didirikan, kegiatan usaha activities to a subsidiary within two years of
bidang panas bumi yang dilaksanakan oleh its establishment. To satisfy this
Pertamina beralih kepada anak perusahaan requirement, Pertamina has established the
yang dibentuknya. Untuk memenuhi Company to continue its geothermal
ketentuan ini, Pertamina mendirikan business activities.
Perusahaan untuk meneruskan kegiatan
usaha panas bumi.
Pertamina membentuk subholding Power, Pertamina formed a sub-holding of Power,
New and Renewable Energy (“PNRE”) New and Renewable Energy (“PNRE”) in
dalam rangka mengembangkan sektor order to develop the electricity and new &
pembangkitan listrik dan energi baru & renewable energy generation sector on
terbarukan pada 12 Juni 2020 dimana June 12, 2020, the Company was
Perusahaan ditetapkan menjadi anak determined to be a subsidiary of the
perusahaan subholding tersebut. Status subholding. The legal end-state of the
hukum atas pembentukan subholding PNRE subholding formation was August 1,
PNRE disahkan pada 1 Agustus 2021. 2021.
Entitas induk Perusahaan adalah The Company’s parent is PT Pertamina
PT Pertamina Power Indonesia dan entitas Power Indonesia and its ultimate parent is
induk terakhirnya adalah Pemerintah the Government of the Republic of
Republik Indonesia. Indonesia.
Dalam Laporan keuangan konsolidasian ini, In this consolidated financial statement, the
Perusahaan dan entitas anaknya bersama- Company and its subsidiaries are together
sama disebut “Grup”. referred to as the “Group”.
(ii) Penawaran Umum Efek Perusahaan (ii) The Company’s Public Offering
Pada tanggal 16 Februari 2023, On February 16, 2023, the Company
Perusahaan mendapatkan Surat obtained Notification Letter regarding the
Pemberitahuan Efektif Pernyataan Effective Statement of Registration No. S-
Pendaftaran No. S-43/D.04/2023 atas 43/D.04/2023 arising from Initial Public
Penawaran Umum Perdana Saham dari Offering of Share from Financial Services
Otoritas Jasa Keuangan (“OJK”). Authority (“OJK”).
Perusahaan efektif mencatatkan The Company registered its initial public
penawaran umum perdana saham pada offering in the Indonesia Stock Exchange
Bursa Efek Indonesia per tanggal 24 effective February 24, 2023, with
Februari 2023, dengan jumlah saham yang 10,350,000,000 shares released to the
dilepas ke publik sebanyak 10.350.000.000 public, with a nominal value of Rp500 per
lembar, dengan nilai nominal Rp500 setiap share and offering value of Rp875 per share
saham dan harga penawaran sebesar and a total proceeds value of
Rp875 per lembar saham serta total nilai Rp9,056,250,000,000 (full amount) before
proceeds sebesar Rp9.056.250.000.000 issuance and underwriting costs.
(nilai penuh) sebelum biaya penerbitan dan
penjaminan emisi.
Page 13
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/3 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
1. INFORMASI UMUM (lanjutan) 1. GENERAL INFORMATION (continued)
a. Perusahaan (lanjutan) a. Company (continued)
(iii) Surat Utang Global Berwawasan (iii) Global Green Bond
Lingkungan
Pada tanggal 27 April 2023, Perusahaan On April 27, 2023, the Company conducted
menerbitkan surat utang berwawasan a public offering global green bond of Senior
lingkungan Senior Unsecured Fixed Rate Unsecured Fixed Rate Notes with nominal
Notes dengan nilai nominal sebesar value of US$400,000,000 (total amount)
US$400.000.000 (nilai penuh) dengan with an interest rate of 5.15% and a due
tingkat Bunga 5,15% dan jatuh tempo date on April 27, 2028, which was issued on
27 April 2028 yang diterbitkan di Bursa Efek the Singapore Stock Exchange (SGX-ST).
Singapura (SGX-ST). Seluruh dana hasil All proceeds from the bond issuance were
penerbitan surat utang tersebut digunakan used to repay bank loans.
untuk membayar pinjaman bank.
Penerbitan surat utang oleh Perseroan di The issuance of bonds by the Company
luar Indonesia sesuai dengan ketentuan outside Indonesia is under the provisions of
Rule 144A dan Regulation S dari U.S. Rule 144A and Regulation S of the U.S.
Securities Act. Surat Utang tidak ditawarkan Securities Act. The bonds are not offered
melalui Penawaran Umum sebagaimana through a Public Offering as referred to in
dimaksud dalam undang-undang pasar the capital market law (UUPM) and are not
modal (UUPM) dan tidak dicatatkan pada listed on the Indonesia Stock Exchange.
Bursa Efek Indonesia. Surat utang The bonds are made without going through
dilakukan tanpa melalui penawaran umum a public offering outside the territory of
di luar wilayah Indonesia dan tidak Indonesia. They are not offered to
ditawarkan kepada investor Indonesia baik Indonesian investors, whether individuals,
individu, institusi maupun bentuk hukum institutions or other legal forms, so they are
lainnya, sehingga tidak wajib memenuhi not required to fulfil the provisions in
ketentuan dalam Peraturan Otoritas Jasa Financial Services Authority Regulations
Keuangan (“POJK”) No.30/2019 (“POJK”) No.30/2019 as confirmed in OJK
sebagaimana ditegaskan dalam Surat OJK Letter No.S-161/2020.
No.S-161/2020.
(iv) Dewan Komisaris, Direksi dan Komite (iv) Board of Commissioners, Directors and
Audit dan Manajemen Risiko Audit and Risk Management Committee
Susunan Dewan Komisaris dan Direksi The composition of the Company’s Board of
Perusahaan pada tanggal 30 September Commissioners and Directors as at
2025 dan 31 Desember 2024 adalah September 30, 2025, and December 31,
sebagai berikut: 2024, were as follows:
30 September 2025 September 30, 2025
Dewan Komisaris: Board of Commissioners:
Komisaris Utama/Independen Gigih Udi Atmo President/Independent Commissioner
Komisaris John Eusebius Iwan Anis Commissioner
Komisaris Abdulla Zayed Commissioner
Komisaris Independen Abdul Musawir Yahya Independent Commissioner
Komisaris Independen Mohammad Firmansyah Independent Commissioner
Page 14
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/4 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
1. INFORMASI UMUM (lanjutan) 1. GENERAL INFORMATION (continued)
a. Perusahaan (lanjutan) a. Company (continued)
(iv) Dewan Komisaris, Direksi dan Komite (iv) Board of Commissioners, Directors and
Audit dan Manajemen Risiko (lanjutan) Audit and Risk Management Committee
(continued)
30 September 2025 September 30, 2025
Direksi: Board of Directors:
Direktur Utama Yulfi Hadi President Director
Direktur Operasi Ahmad Yani Operations Director
Direktur Eksplorasi Exploration and
dan Pengembangan Edwil Suzandi Development Director
Direktur Keuangan Yurizki Rio Finance Director
31 Desember 2024 December 31, 2024
Dewan Komisaris: Board of Commissioners:
Komisaris Utama/Independen Sarman Simanjorang President/Independent Commissioner
Komisaris Gigih Udi Atmo Commissioner
Komisaris John Eusebius Iwan Anis Commissioner
Komisaris Independen Abdulla Zayed Independent Commissioner
Komisaris Independen Abdul Musawir Yahya Independent Commissioner
Direksi: Board of Directors:
Direktur Utama Yulfi Hadi President Director
Direktur Operasi Ahmad Yani Operations Director
Direktur Eksplorasi Exploration and
dan Pengembangan Edwil Suzandi Development Director
Direktur Keuangan Yurizki Rio Finance Director
Personil manajemen kunci Perusahaan The key management personnel of the
adalah Dewan Komisaris dan Direksi Company are the Board of Commissioners
sebagaimana disebutkan di atas and Directors, as mentioned above (Note
(Catatan 26l). 26l).
Susunan Komite Audit pada tanggal 30 The composition of the Company’s Audit
September 2025 dan 31 Desember 2024 Committee as at September 30, 2025, and
adalah sebagai berikut: December 31, 2024, were as follows:
30 September 2025 September 30, 2025
Ketua Mohammad Firmansyah Chairman
Anggota Abdulla Zayed Member
Anggota Qatro Romandhi Member
Anggota Rafi Rakhmadhan Member
31 Desember 2024 December 31, 2024
Ketua Abdulla Zayed Chairman
Anggota Qatro Romandhi Member
Anggota Rafi Rakhmadhan Member
Page 15
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/5 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
1. INFORMASI UMUM (lanjutan) 1. GENERAL INFORMATION (continued)
a. Perusahaan (lanjutan) a. Company (continued)
(v) Domisili (v) Principal Address
Kantor pusat Perusahaan beralamat di The principal address of the Company’s
Grha Pertamina – Tower Pertamax Lt. 7, Jl. head office is Grha Pertamina – Pertamax
Medan Merdeka Timur No. 11-13, Gambir, Tower, 7th floor, Medan Merdeka Timur No.
Jakarta Pusat 10110. 11-13, Gambir, Central Jakarta 10110.
(vi) Karyawan (vi) Employees
Pada tanggal 30 September 2025 dan 31 As of September 30, 2025, and December
Desember 2024, Perusahaan mempunyai 31, 2024, the Company has 560 and 525
masing-masing 560 dan 525 (tidak diaudit) employees, respectively (unaudited),
dimana masing-masing sebanyak 109 dan whereas 109 and 123 employees,
123 karyawan (tidak diaudit) adalah pekerja respectively (unaudited), are the secondee
Pertamina dengan status karyawan employees Pertamina to the Group.
perbantuan kepada Grup.
b. Entitas anak b. Subsidiaries
Pada tanggal 30 September 2025 dan 31 As of September 30, 2025, and December 31,
Desember 2024, Perusahaan memiliki 2024, the Company controlled directly the
pengendalian secara langsung dan bersama following subsidiaries:
pada entitas anak sebagai berikut:
Mulai
Beroperasi
Secara Pesentase kepemilikan/ Jumlah aset sebelum eliminasi/
Tempat komersial/ Kegiatan Percentage of ownership Total assets before elimination
Nama entitas kedudukan/ Start of usaha/ 30 September/ 31 Desember/ 30 September/ 31 Desember/
Anak/Name of Place of commercial Nature of September 30, December 31, September 30, December 31,
subsidiaries domicile operations business 2025 2024 2025 2024
PT Pertamina Provinsi Belum Panas bumi/ 99% 99% 9 12
Geothermal DKI Jakarta/ beroperasi/ Geothermal
Energy Province of Not yet
Kotamobagu*) DKI Jakarta operating
PT Geothermal Provinsi Belum Panas bumi/ 75% 75% 26 29
Energi DKI Jakarta/ beroperasi/ Geothermal
Seulawah Province of Not yet
DKI Jakarta operating
*) PGEL berganti nama menjadi PGEK efektif pada tanggal 4 Agustus 2022/PGEL has changed its name to PGEK effectively on August 4, 2022.
Perusahaan mendirikan PT Pertamina The Company established PT Pertamina
Geothermal Energy Lawu (“PGEL”), yang saat Geothermal Energy Lawu (“PGEL”), which is
ini bernama PT Pertamina Geothermal Energy currently named PT Pertamina Geothermal
Kotamobagu (“PGEK”) dan PT Geothermal Energy Kotamobagu (“PGEK”) and
Energi Seulawah (“GES”) masing-masing pada PT Geothermal Energi Seulawah (“GES”) in
tahun 2016 dan 2017. 2016 and 2017, respectively.
Page 16
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/6 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
1. INFORMASI UMUM (lanjutan) 1. GENERAL INFORMATION (continued)
c. Ventura bersama c. Joint venture
Pada 30 September 2025 dan 31 Desember As of September 30, 2025, and December 31,
2024, ventura bersama dengan kepemilikan 2024, the direct joint ventures are as follows:
langsung sebagai berikut:
Mulai
beroperasi
secara Pesentase kepemilikan/
Tempat komersial/ Kegiatan Percentage of ownership
Nama ventura kedudukan/ Start of usaha/ 30 September/ 31 Desember/
bersama/Name Place of commercial Nature of September 30, December 31,
of joint ventures domicile operations business 2025 2024
PT Cahaya Provinsi Belum Panas bumi/ 40% 40%
Anagata DKI Jakarta/ beroperasi/ Geothermal
Energy*) Province of Not yet
DKI Jakarta operating
*) PT Cahaya Anagata Energy merupakan suatu ventura bersama yang dibentuk bersama-sama dengan Chevron New Energies Holdings Indonesia Ltd./
PT Cahaya Anagata Energy is a joint venture formed together with Chevron New Energies Holdings Indonesia Ltd.
Pada tanggal 12 Juni 2023, sebagai bentuk On June 12, 2023, as a form of the Group’s
usaha Grup untuk menambah kapasitas business to increase installed capacity, based
terpasang, berdasarkan Keputusan Menteri on the Decree of the Minister of Energy and
Energi dan Sumber Daya Mineral Nomor Mineral Resources Number
118.K/EK.01/MEM.E/2023 menetapkan PT 118.K/EK.01/MEM.E/2023, PT Pertamina
Pertamina Geothermal Energy Tbk dan PT Jasa Geothermal Energy Tbk and PT Jasa Daya
Daya Chevron sebagai pemenang pelelangan Chevron were determined as the winners’
wilayah kerja panas bumi Way Ratai, Provinsi auction of the Way Ratai geothermal working
Lampung. area, Lampung Province.
Pada tanggal 3 Oktober 2023 melalui perjanjian On October 3, 2023, PT Jasa Daya Chevron
novasi, berdasarkan perjanjian rekening transferred its rights and obligations to Chevron
bersama dan perjanjian kerja sama, PT Jasa New Energies Holdings Indonesia Ltd through a
Daya Chevron mengalihkan hak dan kewajiban novation agreement based on a joint account
kepada Chevron New Energies Holdings and cooperation agreement.
Indonesia Ltd.
Pada tanggal 6 Desember 2023, sebagai bagian On December 6, 2023, as part of the
dari pendirian ventura bersama tersebut, establishment of the joint venture, the Group
Perusahaan mengambil bagian dan melakukan took part and invested in 11,640,000 shares with
penyertaan modal dengan jumlah saham a nominal value of US$1 (full amount), with 40%
11.640.000 lembar dengan nilai nominal US$1 ownership percentage and Chevron New
(nilai penuh), dengan presentase kepemilikan Energies Holdings Indonesia Ltd owns the
40% dan sisa nya sebesar 60% dimiliki oleh remaining 60%.
Chevron New Energies Holdings Indonesia Ltd.
Perusahaan ini didirikan berdasarkan Akta This company was established based on
Notaris No. 36 Tahun 2023 dan untuk Notarial Deed No. 36 of 2023, and its
pelaksanaan operasional nya didasari oleh operational implementation is based on the
Perjanjian Pemegang Saham tanggal 4 Januari Shareholder Agreement dated January 4, 2024,
2024 yang telah disepakati oleh para pihak. which the parties agreed upon.
Page 17
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/7 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
1. INFORMASI UMUM (lanjutan) 1. GENERAL INFORMATION (continued)
c. Ventura bersama (lanjutan) c. Joint venture (continued)
Pada tanggal 23 September 2024, PT Cahaya On September 23, 2024, PT Cahaya Anagata
Anagata Energy telah mendapatkan Izin Panas Energy obtained a Geothermal Permit valid for
Bumi yang berlaku selama 37 (tiga puluh tujuh) 37 (thirty-seven) years, with exploration
tahun, dengan tahapan kegiatan eksplorasi activities lasting a maximum of 5 (five) years and
paling lama 5 (lima) tahun dan dilanjutkan continued with exploitation and utilisation
dengan kegiatan eksplotasi dan pemanfaatan activities lasting a maximum of 30 (thirty) years.
paling lama 30 (tiga puluh) tahun.
Maksud dan tujuan perusahaan ini didirikan The aim and objective of this company's
adalah untuk bergerak di bidang pengusahaan establishment is to operate in the geothermal
tenaga panas bumi. Untuk mencapai maksud energy business. To achieve these objectives,
tujuan tersebut, perusahaan dapat companies can carry out geothermal energy
melaksanakan kegiatan eksplorasi energi panas exploration activities, including exploration
bumi, termasuk kegiatan eksplorasi di kawasan activities in forest areas and other activities
hutan dan kegiatan-kegiatan lain yang berkaitan related to exploiting geothermal energy in the
dengan pengusahaan energi panas bumi place where it is used.
sampai ke tempat pemanfaatannya.
Grup menjadi venturer dalam ventura bersama The Group became a joint venturer in the form
berupa pengendalian bersama entitas dengan of a jointly controlled entity by recognising its
mengakui bagian partisipasi dalam laporan participating interest in the financial statements
keuangan menggunakan metode ekuitas. using the equity method.
d. Penyelesaian laporan keuangan d. Completion of consolidated financial
konsolidasian statement
Manajemen Perusahaan bertanggung jawab The Company’s management is responsible for
atas penyusunan dan penyajian wajar laporan preparing and fairly presenting these
keuangan konsolidasian ini sesuai dengan consolidated financial statements under
Standar Akuntansi Keuangan di Indonesia, yang Indonesian Financial Accounting Standards,
diselesaikan dan diotorisasi untuk diterbitkan which were completed and authorised for
oleh Direksi Perusahaan pada tanggal issuance by the Company's Board of Directors
24 Oktober 2025. on October 24, 2025.
2. BISNIS OPERASI PANAS BUMI 2. GEOTHERMAL BUSINESS OPERATIONS
Sejak tahun 1974, Pertamina Lama memperoleh Since 1974, the former Pertamina Entity has been
wilayah-wilayah kerja panas bumi di Indonesia assigned geothermal working areas in Indonesia
berdasarkan surat-surat keputusan dari Menteri based on various decision letters issued by the
Pertambangan dan Energi. Sesuai dengan Minister of Mines and Energy. Following Government
Peraturan Pemerintah No. 31 Tahun 2003, Regulation No. 31 Year 2003, all rights and
segala hak dan kewajiban, yang timbul dari kontrak obligations arising from the contracts and
dan perikatan antara Pertamina Lama dengan agreements entered between former Pertamina
pihak ketiga, sepanjang tidak bertentangan Entity and third parties, so long as these are not
dengan Undang-Undang No. 22 Tahun 2001, contrary to Law No. 22 Year 2001, were transferred
beralih kepada Pertamina sejak tanggal to Pertamina effective September 17, 2003. Through
17 September 2003. Pertamina melalui Surat its letter No.282/C00000/2007-S0 dated March 12,
No.282/C00000/2007-S0 tertanggal 12 Maret 2007 2007, Pertamina assigned its geothermal Working
menyerahkan wilayah kerja panas bumi kepada areas to the Company effective from January 1,
Perusahaan sejak tanggal 1 Januari 2007. 2007.
Page 18
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/8 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
2. BISNIS OPERASI PANAS BUMI (lanjutan) 2. GEOTHERMAL BUSINESS OPERATIONS
(continued)
Pengalihan hak, kewajiban dan kepentingan yang The transfer of Pertamina’s rights, obligations and
berhubungan dengan kegiatan pengusahaan panas interests in geothermal business operations to the
bumi Pertamina ke Perusahaan telah mendapat Company was approved by the Minister of Energy
persetujuan dari Menteri Energi dan Sumber Daya and Mineral Resources in letters No.
Mineral melalui surat No. 2198/30/DJB/2009 tanggal 2198/30/DJB/2009 dated August 4, 2009, and No.
4 Agustus 2009 dan surat No. 2523/30/DJB/2009 2523/30/DJB/2009 dated September 1, 2009.
tanggal 1 September 2009. Efektif sejak tanggal Effective June 28, 2010, Pertamina’s geothermal
28 Juni 2010 aset panas bumi Pertamina telah assets were transferred to the Company, which
dialihkan kepada Perusahaan, sebagai tambahan formed part of Pertamina’s contribution to the
setoran modal Pertamina kepada Perusahaan. Company’s additional paid-up capital. This transfer of
Pengalihan aset panas bumi Pertamina tersebut Pertamina’s geothermal assets was documented in
dituangkan dalam Akta Notaris No. 23 tanggal Notarial Deed No. 23 dated June 28, 2010, of
28 Juni 2010 oleh Lenny Janis Ishak, S.H. Lenny Janis Ishak, S.H.
Pengusahaan wilayah-wilayah kerja tersebut The operations of the above geothermal working
dilakukan dengan cara sebagai berikut: areas are conducted through the following schemes:
● Operasi sendiri ● Own operations
● Kontrak Operasi Bersama (“KOB”) ● Joint Operating Contracts (“JOCs”)
Berdasarkan Keputusan Menteri Energi dan Sumber Based on the Minister of Energy and Mineral
Daya Mineral melalui surat keputusan Nomor Resources Decree through decision letter Number
11.K/HK.02/MEM.E/2022, tanggal 14 Januari 2022 11.K/HK.02/MEM.E/2022 dated January 14, 2022,
Menteri Energi dan Sumber Daya Mineral menyetujui the Minister of Energy and Mineral Resources has
pengembalian Izin Panas Bumi PT Pertamina approved the relinquishment of PT Pertamina
Geothermal Energy Lawu di Wilayah Kerja Gunung Geothermal Energy Lawu’s Geothermal Permit in
Lawu. Gunung Lawu working area.
Pada tanggal 30 September 2025 dan 31 Desember As of September 30, 2025, and December 31, 2024,
2024, wilayah kerja panas bumi Grup adalah sebagai the Group’s geothermal working areas are as follows:
berikut:
a. Operasi sendiri a. Own operations
Berikut informasi wilayah kerja yang dikelola The following working areas are operated by the
sendiri oleh Grup: Group:
Kapasitas (tidak diaudit)/
Capacity (unaudited)
Status lapangan/ Uap/Steam Listrik/Electricity
Wilayah kerja/Working areas Lokasi/Locations Field status (Megawatts/MW) (Megawatts/MW)
Dikelola oleh Perusahaan/ Managed by the Company
Gunung Sibayak – Gunung Sinabung Sibayak, Sumatera Utara/ Produksi/Production 10 2
North Sumatera
Kamojang – Drajat Kamojang, Jawa Barat/ Produksi/Production 140 95
West Java
Lahendong Lahendong, Sulawasi Produksi/Production 80 40
Utara/North Sulawesi
Gunung Way Panas Ulubelu, Lampung Produksi/Production 110 110
Karaha – Cakrabuana Karaha, Jawa Barat/ Produksi/Production - 30
West Java
Lumut Balai dan Marga Bayur Lumut Balai, Sumatera Produksi/Production - 110
Selatan/South Sumatera
Page 19
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/9 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
2. BISNIS OPERASI PANAS BUMI (lanjutan) 2. GEOTHERMAL BUSINESS OPERATIONS
(continued)
a. Operasi sendiri (lanjutan) a. Own operations (continued)
Kapasitas (tidak diaudit)/
Capacity (unaudited)
Status lapangan/ Uap/Steam Listrik/Electricity
Wilayah kerja/Working areas Lokasi/Locations Field status (Megawatts/MW) (Megawatts/MW)
Dikelola oleh Perusahaan/ Managed by the Company
Hululais Hululais, Bengkulu Pengembangan/ - -
Development
Sungai Penuh Sungai Penuh, Jambi Eksplorasi/Exploration - -
Dikelola oleh Entitas Anak/ Managed by Subsidiaries
Seulawah Agam Aceh Eksplorasi/Exploration - -
Kotamobagu Sulawesi Utara/ Eksplorasi/Exploration - -
North Sulawesi
Pada tanggal 30 September 2025 dan 31 As of September 30, 2025, and December 31,
Desember 2024, wilayah kerja Perusahaan 2024, the Company’s working areas have
sudah berproduksi dengan minimum keluaran generated output that is at least equivalent to the
ekuivalen dengan kontrak Perusahaan dengan Company’s contracts with customers, which
pelanggan, yaitu antara 72,23% sampai 90% range from 72.23% to 90% of total capacity.
dari total kapasitas.
Berdasarkan Keputusan Menteri ESDM No. Based on the Decree of the Minister of
14.K/EK.01/MEM.E/2022 tanggal 20 Januari Energy and Mineral Resources No.
2022 tentang Perubahan atas Keputusan 14.K/EK.01/MEM.E/2022 dated 20 January
Menteri ESDM No. 143.K/36/MEM.E/2022 2022 of Amendments to the Minister of Energy
tentang Penugasan Pengusahaan Panas Bumi and Mineral Resources Decree No.
kepada PT Pertamina (Persero) di Wilayah Kerja 143.K/36/MEM.E/2022 of the Assignment of
Panas Bumi di Daerah Kotamobagu, PT Geothermal Business to PT Pertamina (Persero)
Pertamina (Persero) menugaskan anak in the Geothermal Working Area in the
perusahaan dari Grup yaitu PT Pertamina Kotamobagu Region, PT Pertamina (Persero)
Geothermal Energy Kotamobagu untuk has assigned the subsidiary of the Group,
mengoperasikan wilayah kerja tersebut. PT Pertamina Geothermal Energy Kotamobagu
to operate the work area.
Page 20
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/10 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
2. BISNIS OPERASI PANAS BUMI (lanjutan) 2. GEOTHERMAL BUSINESS OPERATIONS
(continued)
a. Operasi sendiri (lanjutan) a. Own operations (continued)
Perjanjian Jual Beli Uap (“PJBU”) (Kamojang 1, The terms of the Steam Sales Contracts
2, 3, Lahendong 2, 3, 4 dan Ulubelu 1, 2) (”SSCs”) (Kamojang 1, 2, 3, Lahendong 2, 3, 4
menerapkan klausul Take or Pay (“TOP”) and Ulubelu 1, 2) apply to Take or Pay (“TOP”)
dan/atau Delivery or Pay (“DOP”). Perjanjian and/or Delivery or Pay (“DOP”) clauses. Energy
Jual Beli Energi Listrik (“PJBL”) (Kamojang 4, 5, Sales Contracts (”ESCs”) (Kamojang 4, 5,
Lahendong 5, 6, Ulubelu 3, 4, Karaha 1 dan Lahendong 4, 5, Ulubelu 3, 4, Karaha 1 and
Lumut Balai 1, 2) menerapkan klausul TOP. Lumut Balai 1, 2) apply TOP clauses. TOP is the
TOP adalah suatu kondisi dalam kontrak dimana contract provision whereby the buyer (PT PLN
pihak pembeli (PT PLN (Persero) (ˮPLNˮ)) harus (Persero) (”PLN”)) is required to pay a minimum
membayar sejumlah kapasitas uap atau listrik capacity payment to the Company based on the
minimum tertentu kepada Perusahaan sesuai specified capacity according to the SSCs/ESCs
dengan jumlah yang disepakati dalam kontrak as long as the Company can supply steam or
PJBU/PJBL selama Perusahaan dapat generate electricity at the minimum specified
memenuhi kebutuhan minimum yang ditentukan level. DOP is the contract provision whereby the
tersebut. DOP adalah suatu kondisi dalam Company is required to pay the buyer (PLN) if
kontrak dimana Perusahaan harus membayar the Company is unable to supply steam or
kekurangan pasokan kepada pembeli (PLN) generate electricity at the minimum specified
apabila Perusahaan tidak dapat memenuhi level according to the SSCs/ESCs. TOP and
pasokan minimum yang ditentukan dalam DOP percentages are specific in each contract.
kontrak PJBU/PJBL. Persentase TOP dan DOP
adalah spesifik dalam setiap kontrak.
Kemampuan Perusahaan untuk memenuhi The Company’s ability to meet the DOP
kuantitas minimum DOP tergantung dari minimum quantities depends on its geothermal
pengelolaan sumber daya panas bumi. Sumber operations. Geothermal energy resources are
daya panas bumi memiliki risiko geologis seperti subject to geological risks, such as releases,
pelepasan (release), tekanan (pressure), dan pressure, and temperature declines. Any of
penurunan suhu. Kondisi tersebut dapat these conditions may increase capital
meningkatkan belanja modal dan biaya operasi, expenditures and operating costs or reduce the
atau mengurangi efisiensi dari fasilitas efficiency of electricity-generating facilities.
pembangkit listrik.
Grup tetap memiliki aset panas bumi dan At the end of the ESC/SSC terms, the Group will
fasilitas pembangkitan listrik pada saat continue to own the geothermal assets and
berakhirnya PJBU/PJBL, tidak ada ketentuan electricity-generating facilities, and there is no
untuk diserahterimakan kepada Pemerintah requirement to hand these assets over to the
atau PLN. Government or PLN.
Page 21
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/11 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
2. BISNIS OPERASI PANAS BUMI (lanjutan) 2. GEOTHERMAL BUSINESS OPERATIONS
(continued)
b. Kontrak Operasi Bersama (”KOB”) b. Joint Operating Contracts (”JOCs”)
Dalam KOB, kegiatan panas bumi di wilayah Under the JOC scheme, geothermal activities in
kerja Grup dioperasikan oleh kontraktor panas the Group’s working areas are conducted by
bumi. geothermal contractors.
Berikut informasi wilayah kerja yang The following are the details of the working areas
dikerjasamakan dengan kontraktor KOB: operated by the JOC contractors:
Kapasitas (tidak diaudit)/
Capacity (unaudited)
Uap/Steam Listrik/Electricity
Wilayah kerja/ Status lapangan/ (Megawatts/ (Megawatts/
Working areas Lokasi/Locations Field status MW) MW) Kontraktor/Contractors
Cibereum – Parabakti Salak, Jawa Barat/ Produksi/Production 180 201 Star Energy Geothermal
West Java Salak Ltd. dan/and Star
Energy Geothermal Salak
Pratama Ltd.
Kamojang – Darajat Darajat, Jawa Barat/ Produksi/Production 55 219 Star Energy Geothermal
West Java Darajat II Ltd.
Pangelengan Wayang Windu, Jawa Produksi/Production - 230 Star Energy Geothermal
Barat/West Java Wayang Windu Ltd.
Gunung Sibual-buali Sarulla, Sumatera Produksi/Production - 330 Sarulla Operation Ltd.
Utara/North Sumatera
Tabanan Bedugul, Bali Eksplorasi/Exploration - - Bali Energy Ltd.
Pada tanggal 30 September 2025 dan 31 As of September 30, 2025, and December 31,
Desember 2024 empat wilayah kerja kontraktor 2024, four of the JOC contractors’ working areas
KOB sudah berproduksi dengan minimum had production output that was at least
keluaran ekuivalen dengan Energy Sales equivalent to the JOC’s Energy Sales Contract,
Contracts dalam KOB, yaitu antara 80% sampai which ranges from 80% to 95% of total capacity.
dengan 95% dari total kapasitas.
Material dan peralatan yang dibeli oleh Materials and equipment purchased by the JOC
kontraktor KOB dan merupakan bagian dari contractors and incorporated into production
fasilitas produksi, dengan memperhatikan aspek facilities, subject to liens in favour of lenders
penjaminan kepada pemberi kredit dan except for equipment leased by the JOC
pengecualian untuk peralatan yang disewa oleh contractors, become the property of the Group
kontraktor KOB, menjadi milik Grup pada saat when landed at Indonesian ports (in the case of
material dan peralatan tersebut berada dalam imports) or upon incorporation into the
wilayah pabean Indonesia (jika diperoleh melalui production facilities. The Group grants the JOC
impor) atau setelah material dan peralatan contractors an exclusive and irrevocable right
tersebut terpasang. Grup memberikan hak during the term of the JOC contracts to use,
eksklusif yang tidak dapat dicabut kembali among other things, the field facilities for
kepada kontraktor KOB untuk menggunakan geothermal operations during the term of the
diantaranya fasilitas produksi untuk kepentingan JOC. The JOC contractors record the costs of
operasi panas bumi selama periode berlakunya these assets during the JOC period.
KOB. Biaya yang dikeluarkan untuk memperoleh
aset-aset tersebut dicatat oleh kontraktor KOB
selama periode KOB.
Page 22
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/12 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
2. BISNIS OPERASI PANAS BUMI (lanjutan) 2. GEOTHERMAL BUSINESS OPERATIONS
(continued)
b. Kontrak Operasi Bersama (”KOB”) (lanjutan) b. Joint Operating Contracts (”JOCs”)
(continued)
Pada saat berakhirnya KOB, fasilitas At the end of the JOC terms, the electricity-
pembangkitan listrik yang dioperasikan oleh generating facilities operated by the JOC
kontraktor KOB akan dialihkan kepada Grup contractors will be transferred to the Group (JOC
(KOB Darajat, Wayang Windu, dan Bedugul) Darajat, Wayang Windu, and Bedugul) and PLN
dan PLN (KOB Salak dan Sarulla). (JOC Salak and Sarulla).
Berdasarkan KOB, Grup berhak mendapatkan Under the JOCs, the Group is entitled to receive
production allowances dari kontraktor KOB yang production allowances from the JOC contractors
besarnya 2,66% untuk KOB Darajat dan 4% at the rate of 2.66% for the Darajat JOC and 4%
untuk KOB Salak, Wayang Windu, Sarulla, dan for the Salak, Wayang Windu, Sarulla, and
Bedugul, dari laba operasi bersih tahunan Bedugul JOCs of the JOC contractors’ annual
kontraktor KOB yang dihitung berdasarkan KOB. net operating income as calculated under the
JOCs.
3. IKHTISAR INFORMASI KEBIJAKAN AKUNTANSI 3. SUMMARY OF MATERIAL ACCOUNTING
MATERIAL POLICIES INFORMATION
a. Dasar Penyajian Laporan Keuangan a. Basis of Presentation of Consolidated
Konsolidasian Financial Statements
Laporan keuangan konsolidasian telah disusun The consolidated financial statements have
sesuai dengan Standar Akuntansi Keuangan di been prepared in accordance with Indonesian
Indonesia, yang mencakup Pernyataan dan Financial Accounting Standards, which
Interpretasi yang dikeluarkan oleh Dewan comprise the Statements and Interpretations
Standar Akuntansi Keuangan Ikatan Akuntan issued by the Financial Accounting Standards
Indonesia (“DSAK IAI”) dan Peraturan- Board of the Institute of Indonesia Chartered
Peraturan serta Pedoman Penyajian dan Accountants (Dewan Standar Akuntansi
Pengungkapan Laporan Keuangan yang Keuangan Ikatan Akuntan Indonesia or DSAK
diterbitkan oleh Otoritas Jasa Keuangan IAI) and the Regulations and Guidelines on
(“OJK”). Financial Statement Presentation and
Disclosures issued by Financial Services
Authority (Otoritas Jasa Keuangan” or “ OJK”).
Laporan keuangan konsolidasian disusun The consolidated financial statements have
berdasarkan konsep akrual, kecuali laporan been prepared on the accrual basis, except for
arus kas konsolidasian, dengan menggunakan the consolidated statement of cash flows, using
konsep biaya historis, kecuali seperti yang the historical cost concept of accounting, except
disebutkan dalam Catatan atas laporan as disclosed in the relevant Notes to the
keuangan konsolidasian yang relevan. consolidated financial statements herein.
Page 23
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/13 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
3. IKHTISAR INFORMASI KEBIJAKAN AKUNTANSI 3. SUMMARY OF MATERIAL ACCOUNTING
MATERIAL (lanjutan) POLICIES INFORMATION (continued)
a. Dasar penyusunan laporan keuangan a. Basis of consolidated financial statements
konsolidasian (lanjutan) preparation (continued)
Laporan arus kas konsolidasian yang disajikan The consolidated statement of cash flows, which
dengan menggunakan metode langsung, have been prepared using the direct method,
menyajikan penerimaan dan pengeluaran kas present receipts and disbursements of cash and
dan setara kas yang diklasifikasikan ke dalam cash equivalents classified into operating,
aktivitas operasi, investasi dan pendanaan. investing and financing activities.
Kebijakan akuntansi yang diterapkan oleh Grup The accounting policies adopted by the Group
adalah selaras bagi tahun yang dicakup oleh are consistently applied for the years covered by
laporan keuangan konsolidasian, kecuali untuk the consolidated financial statements, except for
standar akuntansi baru dan revisi seperti new and revised accounting standards as
diungkapkan pada Catatan 3b dibawah ini. disclosed in the following Note 3b.
Grup telah menyusun laporan keuangan The Group has prepared the consolidated
konsolidasian dengan dasar bahwa Grup akan financial statements on the basis that it will
menjaga kelangsungan usaha. continue to operate as a going concern.
b. Perubahan kebijakan akuntansi b. Changes in accounting principles
Amandemen PSAK 221: Kekurangan Amendment of PSAK 221: Lack of
Ketertukaran Exchangeability
Amandemen tersebut mengharuskan The amendments require disclosure of
pengungkapan informasi yang memungkinkan information that enables users of financial
pengguna laporan keuangan memahami statements to understand the impact of a
dampak mata uang yang tidak dapat currency not being exchangeable into the other
dipertukarkan dengan mata uang lain yang currency affects, or is expected to affect, the
memengaruhi, atau diperkirakan akan entity’s financial performance, financial position
memengaruhi, kinerja keuangan, posisi and cash flows.
keuangan, dan arus kas entitas.
Amandemen ini tidak diharapkan akan The amendments are not expected to have an
memberikan dampak terhadap laporan impact on the Group’s consolidated financial
keuangan konsolidasian Grup. statements.
PSAK 117: Kontrak Asuransi PSAK 117: Insurance Contracts
Standar akuntansi baru yang komprehensif A comprehensive new accounting standard for
untuk kontrak asuransi yang mencakup insurance contracts covering recognition and
pengakuan dan pengukuran, penyajian dan measurement, presentation and disclosure, upon
pengungkapan, pada saat berlaku efektif PSAK its effective date, PSAK 117 will replace PSAK
117 akan menggantikan PSAK 62: Kontrak 104: Insurance Contracts. PSAK 117 applies to
Asuransi. PSAK 104: Kontrak asuransi berlaku all types of insurance contracts, life, non-life,
untuk semua jenis kontrak asuransi, jiwa, non- direct insurance and re-insurance, regardless of
jiwa, asuransi langsung dan reasuransi, terlepas the entities issuing them, as well as to certain
dari entitas yang menerbitkannya, serta untuk guarantees and financial instruments with
jaminan dan instrumen keuangan tertentu discretionary participation features, while a few
dengan fitur partisipasi tidak mengikat, serta scope exceptions will apply. The overall objective
beberapa pengecualian ruang lingkup akan of PSAK 117 is to provide an accounting model
berlaku. Tujuan keseluruhan dari PSAK 117 for insurance contracts that is more useful and
adalah untuk menyediakan model akuntansi consistent for insurers.
untuk kontrak asuransi yang lebih bermanfaat
dan konsisten untuk asuradur.
Page 24
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/14 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
3. IKHTISAR INFORMASI KEBIJAKAN AKUNTANSI 3. SUMMARY OF MATERIAL ACCOUNTING
MATERIAL (lanjutan) POLICIES INFORMATION (continued)
b. Perubahan kebijakan Akuntansi (lanjutan) b. Changes in accounting principles (continued)
PSAK 117: Kontrak Asuransi (lanjutan) PSAK 117: Insurance Contracts (continued)
Standar ini tidak diharapkan memiliki dampak This standard is not expected to have any impact
pada pelaporan keuangan Grup pada saat to the financial reporting of the Group upon first-
diadopsi untuk pertama kali karena menerbitkan time adoption because the Group does not issue
kontrak asuransi seperti didefiniskan dalam insurance contracts as defined in PSAK 117.
PSAK 117.
c. Prinsip-prinsip konsolidasi c. Principles of consolidation
Laporan keuangan konsolidasian meliputi The consolidated financial statements comprise
laporan keuangan Perusahaan dan entitas- the Company's and its subsidiaries' financial
entitas anak. Kendali diperoleh bila Grup statements. Control is achieved when the Group
terekspos atau memiliki hak atas imbal hasil is exposed to or has rights to variable returns
variabel dari keterlibatannya dengan investee from its involvement with the investee and can
dan memiliki kemampuan untuk mempengaruhi affect those returns through its power over the
imbal hasil tersebut melalui kekuasaannya atas investee.
investee.
Dengan demikian, Grup mengendalikan Thus, the Group controls an investee if and only
investee jika dan hanya jika Grup memiliki if the Group has all the following:
seluruh hal berikut ini:
1. Kekuasaan atas investee, yaitu hak yang 1. Power over the investee, that is, existing
ada saat ini yang memberi Grup rights that give the Group current ability to
kemampuan kini untuk mengarahkan direct the relevant activities of the investee,
aktivitas relevan dari investee,
2. Eksposur atau hak atas imbal hasil variabel 2. Exposure, or rights, to variable returns from
dari keterlibatannya dengan investee, dan its involvement with the investee, and
3. Kemampuan untuk menggunakan 3. The ability to use its power over the investee
kekuasaannya atas investee untuk to affect its returns.
mempengaruhi jumlah imbal hasil.
Bila Grup tidak memiliki hak suara atau hak When the Group has less than a majority of the
serupa secara mayoritas atas suatu investee, voting or similar rights of an investee, the Group
Grup mempertimbangkan semua fakta dan considers all relevant facts and circumstances in
keadaan yang relevan dalam mengevaluasi assessing whether it has power over an
apakah mereka memiliki kekuasaan atas investee, including:
investee, termasuk:
1. Pengaturan kontraktual dengan pemilik hak 1. The contractual arrangement with the other
suara lainnya dari investee, vote holders of the investee,
2. Hak yang timbul atas pengaturan kontraktual 2. Rights arising from other contractual
lain, dan arrangements, and
3. Hak suara dan hak suara potensial yang 3. The Group's voting rights and potential
dimiliki Grup. voting rights.
Page 25
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/15 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
3. IKHTISAR INFORMASI KEBIJAKAN AKUNTANSI 3. SUMMARY OF MATERIAL ACCOUNTING
MATERIAL (lanjutan) POLICIES INFORMATION (continued)
c. Prinsip-prinsip konsolidasi (lanjutan) c. Principles of consolidation (continued)
Grup menilai kembali apakah mereka The Group re-assesses whether it controls an
mengendalikan investee bila fakta dan keadaan investee if facts and circumstances indicate
mengindikasikan adanya perubahan terhadap changes to one or more of the three control
satu atau lebih dari ketiga elemen dari elements. Consolidation of subsidiaries begins
pengendalian. Konsolidasi atas entitas-entitas when the Group obtains control over the
anak dimulai sejak Grup memperoleh subsidiary and ceases when the Group loses
pengendalian atas entitas anak dan berakhir control of the subsidiary. Assets, liabilities,
pada saat Grup kehilangan pengendalian atas income and expenses of a subsidiary acquired
entitas anak. Aset, liabilitas, penghasilan dan during the year are included in the consolidated
beban dari entitas anak yang diakuisisi pada financial statements from the date the Group
tahun tertentu disertakan dalam laporan gains control until the date the Group ceases to
keuangan konsolidasian sejak tanggal Grup control the subsidiary.
memperoleh kendali sampai tanggal Grup tidak
lagi mengendalikan entitas anak tersebut.
Seluruh laba rugi dan setiap komponen Profit or loss and each component of other
penghasilan komprehensif lain (“PKL”) comprehensive income (“OCI”) is attributed to
diatribusikan pada pemilik entitas induk dan the equity holders of the parent of the Group and
pada kepentingan nonpengendali (“KNP”), the non-controlling interests (“NCI”), even if this
walaupun hal ini akan menyebabkan saldo KNP results in the NCI having a deficit balance. When
yang defisit. Bila dipandang perlu, penyesuaian necessary, adjustments are made to the
dilakukan terhadap laporan keuangan entitas financial statements of subsidiaries to align their
anak untuk diselaraskan dengan kebijakan accounting policies with the Group’s accounting
akuntansi Grup. policies.
Seluruh aset dan liabilitas, ekuitas, penghasilan On consolidation, all intra-group assets and
dan beban dan arus kas atas transaksi antar liabilities, equity, income, expenses, and cash
anggota Grup dieliminasi sepenuhnya pada saat flows related to transactions between members
konsolidasi. of the Group are eliminated in full.
Perubahan dalam bagian kepemilikan entitas A change in the parent’s ownership interest in a
induk pada entitas anak yang tidak subsidiary, without a loss of control, is accounted
mengakibatkan hilangnya pengendalian, dicatat for as an equity transaction. Suppose the Group
sebagai transaksi ekuitas. Bila kehilangan loses control over a subsidiary; in that case, it
pengendalian atas suatu entitas anak, maka derecognises the related assets (including
Grup menghentikan pengakuan atas aset goodwill), liabilities, NCI and another component
(termasuk goodwill), liabilitas dan komponen lain of equity, while the difference is recognised in
dari ekuitas terkait, dan selisihnya diakui pada the profit or loss. Any investment retained is
laba rugi. Bagian dari investasi yang tersisa recognised at fair value.
diakui pada nilai wajar.
Page 26
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/16 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
3. IKHTISAR INFORMASI KEBIJAKAN AKUNTANSI 3. SUMMARY OF MATERIAL ACCOUNTING
MATERIAL (lanjutan) POLICIES INFORMATION (continued)
d. Klasifikasi lancar dan tak lancar d. Current and non-current classification
Grup menyajikan aset dan liabilitas dalam The Group presents assets and liabilities in the
laporan posisi keuangan konsolidasian statement of financial position based on
berdasarkan klasifikasi lancar/tak lancar. Suatu current/non-current classification. An asset is
aset disajikan lancar bila: current when it is:
1. Akan direalisasi, dijual atau dikonsumsi 1. Expected to be realised or intended to be
dalam siklus operasi normal, sold or consumed in the normal operating
cycle,
2. Untuk diperdagangkan, 2. Held primarily for the purpose of trading,
3. Akan direalisasi dalam 12 bulan setelah 3. expected to be realised within 12 months
tanggal pelaporan, atau after the reporting period, or
4. Kas atau setara kas kecuali yang dibatasi 4. Cash or cash equivalent unless restricted
penggunaannya atau akan digunakan untuk from being exchanged or used to settle a
melunasi suatu liabilitas dalam kurun waktu liability for at least 12 months after the
12 bulan setelah tanggal pelaporan. reporting period.
Seluruh aset lain diklasifikasikan sebagai tidak All other assets are classified as non-current.
lancar.
Suatu liabilitas disajikan lancar bila: A liabilities is current when it is:
1. Akan dilunasi dalam siklus operasi normal, 1. Expected to be settled in the normal
operating cycle,
2. Untuk diperdagangkan, 2. Held primarily for the purpose of trading,
3. Akan dilunasi dalam 12 bulan setelah 3. Due to be settled within 12 months after the
tanggal pelaporan, atau reporting period, or
4. Tidak ada hak untuk menangguhkan 4. There is no right at the end of reporting
pelunasannya dalam kurun waktu 12 bulan period to defer the settlement of the liability
setelah periode pelaporan. for at least 12 months after the reporting
period
Seluruh liabilitas lain diklasifikasikan sebagai All other liabilities are classified as non-current.
tidak lancar.
Aset dan kewajiban pajak tangguhan Deferred tax assets and liabilities are classified
diklasifikasikan sebagai aset dan kewajiban as non-current assets and liabilities.
jangka panjang.
e. Kas dan setara kas e. Cash and cash equivalents
Kas dan setara kas dalam laporan posisi Cash and cash equivalents in the statements of
keuangan konsolidasian terdiri dari kas dan consolidated financial position comprise cash on
bank serta deposito jangka pendek yang jatuh hand and in banks and short-term deposits with a
tempo dalam waktu 3 bulan atau kurang, yang maturity of three (3) months or less, that are
dapat segera dikonversikan menjadi kas dalam readily convertible to a known amount of cash and
jumlah yang dapat ditentukan dan memiliki risiko subject to an insignificant risk of changes in value.
perubahan nilai yang tidak signifikan.
Kas dan setara kas yang dibatasi Cash and cash equivalents which are restricted
penggunaannya yang akan digunakan untuk for repayment of currently maturing obligations
membayar liabilitas yang akan jatuh tempo are presented as restricted cash under the current
dalam waktu satu tahun disajikan sebagai kas assets section. Cash and cash equivalents which
yang dibatasi penggunaannya dan disajikan are restricted to repay obligations maturing after
sebagai bagian dari aset lancar. Kas dan setara one year from the date of consolidated statement
kas yang dibatasi penggunaannya untuk of financial position are presented as part of
membayar liabilitas yang akan jatuh tempo restricted cash under the non-current assets
dalam waktu lebih dari satu tahun dari tanggal section.
laporan posisi keuangan konsolidasian disajikan
dalam kas yang dibatasi penggunaannya dan
disajikan sebagai bagian dari aset tidak lancar.
Page 27
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/17 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
3. IKHTISAR INFORMASI KEBIJAKAN AKUNTANSI 3. SUMMARY OF MATERIAL ACCOUNTING
MATERIAL (lanjutan) POLICIES INFORMATION (continued)
f. Transaksi dengan pihak berelasi f. Transactions with related parties
Perusahaan dan entitas anaknya melakukan The company and subsidiaries have
transaksi dengan pihak berelasi sesuai dengan transactions with related parties as defined in
definisi yang diuraikan pada PSAK 224: PSAK 224: Related Party Disclosures.
Pengungkapan Pihak-pihak Berelasi.
Transaksi ini dilakukan berdasarkan The transactions are made based on terms
persyaratan yang disetujui oleh kedua belah agreed by the parties, which may not be the
pihak, yang mungkin tidak sama dengan same as those made with unrelated parties.
transaksi lain yang dilakukan dengan pihak-
pihak yang tidak berelasi.
Saldo dan transaksi signifikan dengan pihak- All significant balances and transactions with
pihak berelasi diungkapkan dalam Catatan 26. related parties are disclosed in Note 26.
Kecuali diungkapkan khusus sebagai pihak Unless specifically identified as related parties,
berelasi, maka pihak-pihak lain yang disebutkan the parties disclosed in the Notes to the
dalam Catatan atas laporan keuangan consolidated financial statements are unrelated
konsolidasian merupakan pihak tidak berelasi. parties.
g. Piutang usaha dan piutang lain-lain g. Trade and other receivables
Piutang usaha dan piutang lain-lain pada Trade and other receivables are initially
awalnya diakui sebesar nilai wajar dan recognised at fair value and subsequently
kemudian diukur pada biaya perolehan measured at amortised cost using the effective
diamortisasi dengan menggunakan metode interest method, less provision for impairment.
suku bunga efektif, dikurangi dengan penyisihan If collection is expected in one year or less (or in
untuk penurunan nilai. Jika piutang diharapkan the normal operating cycle of the business if
tertagih dalam satu tahun atau kurang (atau longer), they are classified as current assets.
dalam siklus normal operasi dari bisnis jika lebih If not, they are presented as non-current assets.
lama), piutang tersebut dikelompokkan sebagai
aset lancar. Jika tidak, piutang tersebut disajikan
sebagai aset tidak lancar.
Piutang usaha merupakan jumlah yang terutang Trade receivables are amounts due from
dari pelanggan atas penjualan uap dan listrik, customers for steam and electricity sold, and
dan production allowances dalam kegiatan production allowances in the ordinary course of
usaha normal. business.
h. Persediaan h. Inventories
Persediaan material seperti suku cadang, bahan Inventory, such as spare parts, chemicals, and
kimia dan lain-lain, dicatat berdasarkan metode others, is stated at the weighted average cost.
rata-rata tertimbang. Persediaan usang, tidak Obsolete, unusable, and slow-moving inventory
terpakai, dan lambat pergerakannya dicatat is also stated at the weighted average cost and
berdasarkan metode rata-rata tertimbang dan recorded as part of the “Non-current assets-
disajikan dalam akun “Aset tidak lancar - Aset Other assets, net” account.
lain-lain, bersih”.
Penyisihan persediaan usang dibentuk untuk An allowance for inventory obsolescence is
mengurangi jumlah tercatat persediaan ke nilai provided to reduce the carrying amounts of
realisasi netonya yang ditentukan melalui inventories to their net realisable value based on
pengujian berkala atas estimasi penggunaan the periodic review of the estimated future usage
atau penjualan masing-masing jenis persediaan or sale of individual inventory items.
di masa yang akan datang.
Page 28
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/18 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
3. IKHTISAR INFORMASI KEBIJAKAN AKUNTANSI 3. SUMMARY OF MATERIAL ACCOUNTING
MATERIAL (lanjutan) POLICIES INFORMATION (continued)
i. Aset tetap i. Fixed assets
Biaya perolehan termasuk biaya penggantian Cost includes replacing parts of fixed assets and
sebagian aset tetap dan biaya pinjaman untuk borrowing costs for long-term construction
proyek konstruksi jangka panjang jika kriteria projects if the recognition criteria are satisfied.
pengakuan terpenuhi. Demikian pula, ketika Likewise, when a major inspection is performed,
major inspection dilakukan, biayanya diakui its cost is recognised at the carrying amounts of
sebagai nilai tercatat aset tetap sebagai biaya the fixed assets as a replacement if the
penggantian, jika kriteria pengakuan terpenuhi. recognition criteria are satisfied.
Tanah tidak disusutkan. Penyusutan aset lain Land is not depreciated. Depreciation on other
dihitung dengan menggunakan metode garis assets is calculated using the straight-line
lurus untuk mengalokasikan harga perolehan method to allocate their cost to their residual
sampai dengan nilai sisanya selama masa values over their estimated useful lives, as
manfaat yang diestimasi, sebagai berikut: follows:
Tahun/Years
Sumur panas bumi 10 - 20 Geothermal wells
Instalasi 5 - 30 Installations
Bangunan 5 - 40 Buildings
Harta benda bergerak 5 - 20 Moveable assets
Biaya-biaya setelah pengakuan awal diakui Subsequent costs are included in the asset’s
sebagai bagian dari nilai tercatat aset atau carrying amount or recognised as a separate
sebagai aset yang terpisah, sebagaimana asset, as appropriate, only when it is probable
mestinya, hanya apabila kemungkinan besar that future economic benefits associated with the
Grup akan mendapatkan manfaat ekonomis di item will flow to the Group and the cost of the
masa depan berkenaan dengan aset tersebut item can be measured reliably. The carrying
dan biaya perolehan aset dapat diukur dengan amount of the replaced part is derecognised. All
andal. Nilai tercatat dari komponen yang diganti other repairs and maintenance are charged to
dihapuskan. Biaya perbaikan dan pemeliharaan the statements of profit or loss and other
dibebankan ke dalam laporan laba-rugi dan comprehensive income during the financial
penghasilan komprehensif lainnya dalam period they are incurred.
periode dimana biaya-biaya tersebut terjadi.
Nilai tercatat dari aset tetap ditelaah untuk The carrying amount of fixed assets is tested for
penurunan nilai ketika terdapat kejadian atau impairment whenever events or changes in
perubahan keadaan yang mengindikasikan circumstances indicate that the carrying amount
bahwa nilai tercatat tidak dapat terpulihkan. may not be recoverable.
Jumlah tercatat aset tetap dihentikan An item of fixed asset is derecognised upon
pengakuannya pada saat dilepaskan atau saat disposal or when no future economic benefits
tidak ada manfaat ekonomis di masa depan are expected from its use or disposal. Any gain
yang diharapkan dari penggunaan atau or loss arising from the derecognition of the
pelepasannya. Laba atau rugi yang timbul dari asset, calculated as the difference between the
penghentian pengakuan aset, yang merupakan net disposal proceeds and the carrying amount
perbedaan antara jumlah neto hasil pelepasan of the asset, is included in profit or loss. The
dengan jumlah tercatatnya, disajikan dalam laba residual value of assets, useful lives, and
rugi. Nilai sisa aset, masa manfaat, dan metode depreciation method are reviewed and adjusted,
penyusutan ditelaah dan jika perlu disesuaikan, if appropriate, at the end of each reporting
pada setiap akhir periode pelaporan. period.
Page 29
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/19 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
3. IKHTISAR INFORMASI KEBIJAKAN AKUNTANSI 3. SUMMARY OF MATERIAL ACCOUNTING
MATERIAL (lanjutan) POLICIES INFORMATION (continued)
i. Aset tetap (lanjutan) i. Fixed assets (continued)
Aset tetap dalam pembangunan Asset Under Construction
Aset tetap dalam pembangunan merupakan Construction in progress represents costs for
biaya-biaya untuk eksplorasi dan evaluasi aset exploring and evaluating geothermal assets,
panas bumi, pengembangan aset panas bumi, developing geothermal assets, and building
dan pembangunan aset tetap lainnya. Biaya- other assets. When an asset is completed and
biaya tersebut akan dipindahkan ke aset tetap ready to use, such costs are transferred to the
yang bersangkutan pada saat aset tersebut relevant fixed asset account. Costs are
selesai dan siap digunakan. Biaya-biaya yang accumulated on a field-by-field basis.
terjadi diakumulasikan berdasarkan lapangan
per lapangan.
Biaya geologi dan geofisika dibebankan pada Geological and geophysical costs are expensed
saat terjadi. as incurred.
Biaya-biaya pemboran sumur eksplorasi dan The costs of drilling exploratory wells and drilling
biaya-biaya pemboran sumur tes stratigrafi, exploratory-type stratigraphic test wells are
dikapitalisasi sebagai bagian dari Aset tetap capitalised as part of assets under construction -
dalam pembangunan - aset eksplorasi, hingga exploration assets, pending the determination of
ditentukan apakah sumur tersebut memenuhi whether the well has met the standards of
standar untuk produksi seperti tekanan dan production, such as pressure and temperature.
temperatur. Jika sumur tersebut memenuhi If the wells have met the production standards,
standar untuk produksi, kapitalisasi biaya the capitalised costs of drilling the wells are
pemboran sumur dievaluasi terhadap tested for impairment and transferred to assets
penurunan nilai dan ditransfer menjadi aset under construction - development assets (even
tetap dalam pembangunan - aset though the well may not yet be completed as a
pengembangan (walaupun sumur tersebut producing well). However, if the well has not met
nantinya tidak akan dijadikan sumur produksi). the production standards, the capitalised costs
Namun demikian, jika sumur tersebut tidak of drilling the well are then charged to expense.
memenuhi standar untuk produksi, biaya
pemboran sumur yang telah dikapitalisasi akan
dicatat sebagai beban.
Biaya-biaya pemboran sumur dalam The costs of drilling development wells, including
pengembangan termasuk biaya pemboran the costs of drilling unsuccessful development
sumur pengembangan yang tidak menghasilkan wells and development-type stratigraphic wells,
sumur pengembangan stratigrafi dikapitalisasi are capitalized as part of the assets under
sebagai bagian dari Aset tetap dalam construction of development wells until drilling is
pembangunan sumur pengembangan hingga completed. When the development well is
proses pemboran selesai. Pada saat completed on a specific field, it is transferred to
pengembangan sumur telah selesai pada fixed assets - production wells.
lapangan tertentu, maka sumur tersebut akan
ditransfer ke aset tetap - sumur produksi.
Page 30
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/20 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
3. IKHTISAR INFORMASI KEBIJAKAN AKUNTANSI 3. SUMMARY OF MATERIAL ACCOUNTING
MATERIAL (lanjutan) POLICIES INFORMATION (continued)
j. Kapitalisasi biaya pinjaman j. Capitalized borrowing costs
Biaya bunga dan biaya pinjaman lainnya, seperti Interest and other borrowing costs, such as
biaya diskonto pinjaman baik yang secara discount fees on loans either directly or indirectly
langsung atau tidak langsung digunakan untuk used to finance the construction of a qualifying
pendanaan konstruksi aset kualifikasian asset, are capitalised up to the date when
(“qualifying asset”), dikapitalisasi hingga aset construction is complete. For borrowing costs
tersebut selesai dikonstruksi. Untuk biaya directly attributable to a qualifying asset, the
pinjaman yang dapat diatribusikan secara amount to be capitalised is determined as the
langsung pada aset kualifikasian, jumlah yang actual borrowing cost incurred during the period,
dikapitalisasi ditentukan dari biaya pinjaman less any income earned on the temporary
aktual yang terjadi selama periode berjalan, investment of this borrowing.
dikurangi penghasilan yang diperoleh dari
investasi sementara atas dana hasil pinjaman
tersebut.
Untuk pinjaman yang tidak dapat diatribusikan For borrowing not directly attributable to a
secara langsung pada suatu aset kualifikasian, qualifying asset, the capitalisation amount is
jumlah yang dikapitalisasi ditentukan dengan determined by applying a capitalisation rate to
mengalikan tingkat kapitalisasi terhadap jumlah the amount expended on the qualifying assets.
yang dikeluarkan untuk memperoleh aset The capitalisation rate is the weighted average
kualifikasian. Tingkat kapitalisasi dihitung of the total borrowing costs applicable to the total
berdasarkan rata-rata tertimbang biaya borrowings outstanding during the period, other
pinjaman yang dibagi dengan jumlah pinjaman than borrowings taken out specifically to obtain
yang tersedia selama periode, selain pinjaman a qualifying asset.
yang secara spesifik diambil untuk tujuan
memperoleh aset kualifikasian.
Biaya pinjaman dapat terjadi selama suatu Borrowing costs may be incurred during an
periode yang diperpanjang yang mana entitas extended period when an entity ceases activities
menghentikan aktivitas yang diperlukan untuk necessary to prepare an asset for its intended
mempersiapkan suatu aset agar dapat use or sale. Such borrowing costs are the costs
digunakan atau dijual sesuai intensinya. Biaya of owning a partially completed asset and do not
pinjaman tersebut merupakan biaya kepemilikan qualify for capitalisation. An entity suspends the
aset yang selesai sebagian dan tidak memenuhi capitalisation of borrowing costs during an
syarat untuk dikapitalisasi. Entitas extended period during which active
menghentikan sementara kapitalisasi biaya development of a qualifying asset ceases.
pinjaman selama periode yang diperpanjang
dimana pengembangan aktif atas aset
kualifikasian juga dihentikan.
k. Utang usaha dan utang lain-lain k. Trade and other payables
Utang usaha dan utang lain-lain pada awalnya Trade and other payables are recognized initially
diakui pada nilai wajar dan kemudian diukur at fair value and subsequently measured at
dengan harga perolehan diamortisasi yang amortised cost using the effective interest
menggunakan metode suku bunga efektif. Utang method. Payables are classified as current
dikelompokan sebagai liabilitas jangka pendek liabilities if payment is due within one year or less
apabila pembayaran jatuh tempo dalam waktu (or within the normal operating cycle of the
satu tahun atau kurang (atau dalam siklus business if longer). If not, they are presented as
normal operasi dari bisnis jika lebih lama). Jika non-current liabilities.
tidak, utang tersebut disajikan sebagai utang
jangka panjang.
Page 31
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/21 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
3. IKHTISAR INFORMASI KEBIJAKAN AKUNTANSI 3. SUMMARY OF MATERIAL ACCOUNTING
MATERIAL (lanjutan) POLICIES INFORMATION (continued)
l. Pinjaman l. Borrowings
Pada saat pengakuan awal, pinjaman diakui Borrowings are recognised initially at fair value,
sebesar nilai wajar, dikurangi dengan biaya- net of transaction costs incurred. Subsequently,
biaya transaksi yang terjadi. Selanjutnya, they are carried at amortised cost; any difference
pinjaman diukur sebesar biaya perolehan between the proceeds (net of transaction costs)
diamortisasi; selisih antara penerimaan and the redemption value is recognised in the
(dikurangi biaya transaksi) dan nilai pelunasan profit or loss throughout the borrowings using the
dicatat pada laporan laba-rugi selama periode effective interest method.
pinjaman dengan menggunakan metode bunga
efektif.
Biaya pinjaman yang terjadi untuk konstruksi Borrowing costs incurred for the construction of
aset kualifikasian, dikapitalisasi selama periode any qualifying asset are capitalised during the
waktu yang dibutuhkan untuk menyelesaikan period of time that is required to complete and
konstruksi aset dan mempersiapkannya sampai prepare the asset for its intended use or sale
dapat digunakan sesuai tujuan yang (Note 3j).
dimaksudkan atau untuk dijual (Catatan 3j).
Pinjaman diklasifikasikan sebagai liabilitas Borrowings are classified as current liabilities
jangka pendek kecuali Grup memiliki hak tanpa unless the Group has an unconditional right to
syarat untuk menunda pembayaran liabilitas defer the liability settlement for at least 12
selama paling tidak 12 bulan setelah tanggal months after the reporting date.
pelaporan.
m. Pengakuan pendapatan dan beban m. Revenues and expenses recognition
Pendapatan dari penjualan uap dan listrik diakui Revenue from sales of steam and electricity is
pada saat terpenuhinya seluruh kondisi berikut: recognised when all the following conditions are
met:
1. Identifikasi kontrak dengan pelanggan. 1. Identify contracts with customers.
2. Identifikasi kewajiban pelaksanaan dalam 2. Identification of performance obligations in
kontrak. Kewajiban pelaksanaan the contract. Performance obligations are
merupakan janji-janji dalam kontrak untuk promises in a contract to deliver steams or
menyerahkan uap atau listrik ke pelanggan. electricity to customers.
3. Penetapan harga transaksi. Harga transaksi 3. Determining the transaction price. The
merupakan jumlah imbalan yang berhak transaction price is the consideration an
diperoleh suatu entitas sebagai kompensasi entity is entitled to receive as compensation
atas diserahkannya uap atau listrik yang for delivering the promised steam or
dijanjikan ke pelanggan. Jika imbalan yang electricity to the customer. If the benefits
dijanjikan di kontrak mengandung suatu promised in the contract contain a variable
jumlah yang bersifat variabel, maka Grup amount, the Group estimates the amount of
membuat estimasi jumlah imbalan tersebut the consideration at the amount expected to
sebesar jumlah yang diharapkan berhak be entitled to receive the promised steam or
diterima atas diserahkannya uap atau listrik electricity to the customer less the estimated
yang dijanjikan ke pelanggan dikurangi amount of steam and electricity guarantees
dengan estimasi jumlah jaminan uap dan to be paid during the contract period.
listrik yang akan dibayarkan selama periode
kontrak.
4. Alokasi harga transaksi ke setiap kewajiban 4. Allocation of the transaction price to each
pelaksanaan dengan menggunakan dasar performance obligation based on the
harga jual berdiri sendiri relatif dari setiap relative stand-alone selling price of each
uap atau listrik berbeda yang dijanjikan di different steam or electricity promised in the
kontrak. Ketika tidak dapat diamati secara contract. When this cannot be observed
langsung, harga jual berdiri sendiri relatif directly, the relative stand-alone selling
diperkirakan berdasarkan biaya yang price is estimated based on expected cost
diharapkan ditambah marjin. plus a margin.
Page 32
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/22 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
3. IKHTISAR INFORMASI KEBIJAKAN AKUNTANSI 3. SUMMARY OF MATERIAL ACCOUNTING
MATERIAL (lanjutan) POLICIES INFORMATION (continued)
m. Pengakuan pendapatan dan beban (lanjutan) m. Revenue and expenses recognition
(continued)
5. Pengakuan pendapatan ketika kewajiban 5. Revenue is recognised when performance
pelaksanaan telah dipenuhi dengan obligations have been fulfilled by delivering
menyerahkan uap atau listrik yang the promised steam or electricity to the
dijanjikan ke pelanggan (ketika pelanggan customer (when the customer controls the
telah memiliki kendali atas barang atau jasa goods or services).
tersebut).
Biaya dan pendapatan sehubungan dengan The cost and revenue involving sales of steam
penjualan uap dan listrik antara Perusahaan, and electricity among the Company, geothermal
kontraktor panas bumi dan PLN dicatat secara contractors and PLN are recorded as net based
bersih setelah mempertimbangkan klausul di on Energy Sales Contracts under a JOC. The
dalam PJBL dalam KOB. KOB tersebut contracts stipulate that the sale of steam and
mengharuskan penjualan uap dan listrik dari electricity from the JOC contractors to PLN is to
kontraktor KOB ke PLN dilakukan melalui be made on the pass-through arrangement with
Perusahaan, dimana Perusahaan akan menjual the Company, in which the Company will charge
kepada PLN pada nilai yang sama dengan biaya PLN in the same amount of the purchase costs
pembelian uap dan listrik dari kontraktor KOB. as the steam and electricity from the JOCs.
Pendapatan dan beban lainnya diakui pada saat Other revenue and expenses are recognised as
terjadi berdasarkan konsep akrual. incurred on an accrual basis.
n. Imbalan kerja n. Employee benefits
i. Program imbalan pasti i. Defined benefit plans
Liabilitas program pensiun imbalan pasti The liability recognised in the consolidated
yang diakui dalam laporan posisi keuangan statement of financial position in respect of
konsolidasian adalah nilai kini kewajiban defined benefit pension plans is the present
imbalan pasti pada tanggal pelaporan value of the defined benefit obligation at the
dikurangi nilai wajar aset program. reporting date less the fair value of plan
Perhitungan tersebut dilakukan oleh assets. An independent actuary performs
aktuaris independen dengan menggunakan the calculation using the projected unit
metode projected unit credit. Nilai kini credit method. The present value of the
kewajiban imbalan pasti ditentukan dengan defined benefit obligation is determined by
mendiskontokan estimasi arus kas keluar di discounting the estimated future cash
masa depan menggunakan tingkat bunga outflows using government bond interest
obligasi pemerintah dengan pertimbangan rates, considering that currently there is no
bahwa pada saat ini tidak terdapat pasar deep market for high-quality corporate
aktif untuk obligasi korporasi yang bonds with terms to maturity approximating
berkualitas tinggi yang memiliki periode the terms of the related liability.
jatuh temponya berdekatan dengan periode
liabilitas tersebut.
Beban yang diakui di laba rugi termasuk Expenses charged to profit or loss include
biaya jasa kini, beban/pendapatan bunga, current service costs, interest
biaya jasa lalu dan keuntungan/kerugian expense/income, past service costs, and
penyelesaian. gains and losses on settlements.
Page 33
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/23 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
3. IKHTISAR INFORMASI KEBIJAKAN AKUNTANSI 3. SUMMARY OF MATERIAL ACCOUNTING
MATERIAL (lanjutan) POLICIES INFORMATION (continued)
n. Imbalan kerja (lanjutan) n. Employee benefits (continued)
i. Program imbalan pasti (lanjutan) i. Defined benefit plans (continued)
Pengukuran kembali program imbalan pasti Remeasurements of defined benefit plans
diakui dalam penghasilan komprehensif are recognised in other comprehensive
lain. Pengukuran kembali terdiri dari income. Remeasurements comprise
keuntungan dan kerugian aktuaria, imbal actuarial gains and losses, the return on
hasil aset program (diluar pendapatan plan assets (excluding amounts included in
bunga yang sudah diakumulasi dalam net interest on the net defined benefit
perhitungan bunga neto/aset) dan setiap liability/asset) and any change in the effect
perubahan atas dampak batas atas aset of the asset ceiling (excluding amounts
(diluar pendapatan bunga yang sudah included in net interest on the net defined
diakumulasi dalam perhitungan bunga benefit liability/asset).
neto/aset).
Biaya jasa lalu diakui segera dalam laba Past-service costs are recognised
rugi, kecuali perubahan pada program immediately in profit or loss unless the
pensiun tergantung pada kondisi karyawan changes to the pension plan are conditional
memberikan jasanya selama periode on the employees remaining in service for a
tertentu (periode vesting). Dalam hal ini, specified period of time (the vesting period).
biaya jasa lalu diamortisasi dengan In this case, the past-service costs are
menggunakan metode garis lurus amortised straight-line over the vesting
sepanjang periode vesting. period.
Keuntungan dan kerugian atas kurtailmen Gains and losses on curtailment are
diakui ketika terdapat komitmen untuk recognised when a commitment to reduce
mengurangi jumlah karyawan yang the number of employees covered by a plan
tercakup dalam suatu program secara or an amendment of defined benefit plan
signifikan atau ketika terdapat perubahan terms, such as a material element of future
ketentuan dalam program imbalan pasti services to be provided by current
yang menyebabkan bagian yang material employees no longer qualifying for benefits
dari jasa masa depan, karyawan tidak lagi or qualifying only for reduced benefits, is
memberikan imbalan atau memberikan made.
imbalan yang lebih rendah.
Program imbalan pasti yang The defined benefit plans provided by the
diselenggarakan oleh Grup meliputi pensiun Group cover defined benefit pension and
imbalan pasti dan kewajiban imbalan pasti defined benefit obligation under Job
berdasarkan Undang- Undang Cipta Kerja Creation Law No. 11/2020 (the “Job
No. 11/2020 (“Undang-Undang Cipta Creation Law”) (before January 1, 2021:
Kerja”) (sebelum 1 Januari 2021: Undang- Labour Law No. 13/2003 (the “Labour
Undang Ketenagakerjaan No. 13/2003 (“UU Law”)) or the Collective Labour Agreement
Ketenagakerjaan”)) atau Kontrak Kerja (the “CLA”), whichever is higher.
Bersama (“KKB”), mana yang lebih tinggi.
Page 34
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/24 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
3. IKHTISAR INFORMASI KEBIJAKAN AKUNTANSI 3. SUMMARY OF MATERIAL ACCOUNTING
MATERIAL (lanjutan) POLICIES INFORMATION (continued)
n. Imbalan kerja (lanjutan) n. Employee benefits (continued)
ii. Imbalan kerja jangka panjang lainnya ii. Other long-term benefits
Kewajiban terkait dengan UTD dihitung oleh The obligation with respect to UTD is
aktuaris independen dengan menggunakan calculated by an independent actuary using
metode projected unit credit dan dibayarkan the projected unit credit method and paid
pada saat karyawan mencapai UTD tertentu when the employees reach certain
selama masa kerjanya. anniversary dates during employment.
Biaya jasa lalu dan keuntungan atau Past service cost and actuarial gains or
kerugian aktuarial yang timbul dari losses arising from experience adjustments
penyesuaian akibat perbedaan antara and changes in actuarial assumptions are
asumsi aktuarial dan kenyataan dan charged immediately to profit or loss.
perubahan asumsi-asumsi aktuarial
dibebankan secara langsung ke laba rugi.
o. Penjabaran mata uang asing o. Foreign currency translation
i. Mata uang fungsional dan penyajian i. Functional and presentation currency
Akun-akun yang tercakup dalam laporan Items included in the Group's consolidated
keuangan konsolidasian Grup diukur financial statements are measured using
menggunakan mata uang dari lingkungan the currency of the primary economic
ekonomi utama di mana entitas beroperasi environment in which the entity operates
(“mata uang fungsional”). Laporan (the “functional currency”). The
keuangan konsolidasian disajikan dalam consolidated financial statements are
ribuan dolar Amerika Serikat (US$), yang presented in thousands of US Dollars
merupakan mata uang fungsional dan (US$), which is the Group’s functional and
penyajian Grup. presentation currency.
ii. Transaksi dan saldo ii. Transactions and balances
Transaksi dalam mata uang selain dolar AS Transactions denominated in currencies
dikonversikan dengan menggunakan kurs other than the US dollar are converted using
yang berlaku pada tanggal transaksi. exchange rates prevailing at the dates of the
transactions.
Pada setiap tanggal pelaporan, aset dan At each reporting date, monetary assets
liabilitas moneter dalam mata uang asing and liabilities denominated in foreign
dijabarkan ke dalam mata uang dolar AS currencies are translated into US dollars
menggunakan kurs JISDOR yang berlaku using the JISDOR rate prevailing as of
pada tanggal 30 September 2025 dan 31 September 30, 2025, and December 31,
Desember 2024. Kurs yang digunakan 2024. The exchange rates of the major
untuk mata uang asing utama adalah foreign currencies used are as follows (full
sebagai berikut (nilai penuh): amount):
30 September/ 31 Desember/
September 30, December 31,
2025 2024
1.000 Rupiah/Dolar 1,000 Rupiah/
Amerika Serikat 0,06 0,06 US Dollar
1 Euro/Dolar 1 Euro/
Amerika Serikat 1,17 1,04 US Dollar
100 Yen Jepang/Dolar 100 Japanese
Amerika Serikat 0,67 0,63 Yen/US Dollar
Page 35
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/25 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
3. IKHTISAR INFORMASI KEBIJAKAN AKUNTANSI 3. SUMMARY OF MATERIAL ACCOUNTING
MATERIAL (lanjutan) POLICIES INFORMATION (continued)
o. Penjabaran mata uang asing (lanjutan) o. Foreign currency translation (continued)
ii. Transaksi dan saldo (lanjutan) ii. Transactions and balances (continued)
Keuntungan dan kerugian selisih kurs yang Foreign exchange gains and losses
timbul dari penyelesaian transaksi dalam resulting from the settlement of such
mata uang asing dan dari penjabaran aset transactions and the translation at period-
dan liabilitas moneter dalam mata uang end exchange rates of monetary assets and
asing diakui di dalam laporan laba-rugi, liabilities denominated in foreign currencies
kecuali jika ditangguhkan di dalam ekuitas are recognised in profit or loss, except when
sebagai lindung nilai arus kas dan lindung deferred in equity as qualifying cash flow
nilai investasi bersih yang memenuhi hedges and qualifying net investment
syarat. hedges.
Keuntungan dan kerugian selisih kurs yang Foreign exchange gains and losses related
berhubungan dengan pinjaman, serta kas to borrowings and cash and cash
dan setara kas disajikan pada laporan laba- equivalents are presented in the profit or
rugi sebagai “(rugi)/laba selisih kurs”. loss within “(loss)/gain foreign exchange”.
p. Perpajakan p. Taxation
Pajak kini Current tax
Aset dan liabilitas pajak kini untuk periode Current income tax assets and liabilities for the
berjalan diukur sebesar jumlah yang diharapkan current period are measured at the amount
dapat direstitusi dari atau dibayarkan kepada expected to be recovered from or paid to the
otoritas perpajakan. Tarif pajak dan peraturan taxation authority. The tax rates and tax laws
pajak yang digunakan untuk menghitung jumlah used to compute the amount are those that have
tersebut adalah yang telah berlaku atau secara been enacted or substantively enacted as at the
substantif telah berlaku pada tanggal pelaporan reporting date in the countries where the Group
di negara tempat Grup beroperasi dan operates and generates taxable income.
menghasilkan pendapatan kena pajak.
Bunga dan denda disajikan sebagai bagian dari Interests and penalties are presented as part of
penghasilan atau beban operasi lain karena other operating income or expenses since they
tidak dianggap sebagai bagian dari beban pajak are not considered as part of the income tax
penghasilan. expense.
Pajak penghasilan kini terkait dengan pos-pos Current income tax relating to items recognised
yang diakui secara langsung di ekuitas diakui directly in equity is recognised in equity, not in
dalam ekuitas dan bukan dalam laporan laba the statement of profit or loss. Management
rugi. Manajemen secara berkala mengevaluasi periodically evaluates positions taken in the tax
posisi yang diambil dalam Surat Pemberitahuan returns concerning situations in which applicable
Tahunan (SPT) sehubungan dengan situasi di tax regulations are subject to interpretation and
mana peraturan perpajakan yang berlaku establishes provisions where appropriate.
tunduk pada interpretasi dan menetapkan
ketentuan yang sesuai.
Sesuai dengan Keputusan Presiden No. Following Presidential Decree No. 49/1991,
49/1991, Keputusan Menteri Keuangan No. Decision Letter of the Minister of Finance No.
766/KMK.04/1992, dan Peraturan Menteri 766/KMK.04/1992, and Ministry of Finance
Keuangan No. 90/PMK.02/2017, Grup sebagai Regulation No. 90/PMK.02/2017, the Group as a
pengusaha panas bumi berkewajiban menyetor geothermal producer is required to transfer the
bagian Pemerintah sebesar 34% dari laba usaha Government’s portion of the Group’s operating
bersih ke Kementerian Keuangan, yang income in the amount of 34% to the Ministry of
diperlakukan sebagai setoran pajak Finance, which amount is deemed to represent
penghasilan. corporate income tax.
Page 36
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/26 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
3. IKHTISAR INFORMASI KEBIJAKAN AKUNTANSI 3. SUMMARY OF MATERIAL ACCOUNTING
MATERIAL (lanjutan) POLICIES INFORMATION (continued)
p. Perpajakan (lanjutan) p. Taxation (continued)
Pajak tangguhan Deferred tax
Pajak tangguhan diakui dengan menggunakan Deferred tax is provided using the liability method
metode liabilitas atas perbedaan temporer pada on temporary differences at the reporting date
tanggal pelaporan antara dasar pengenaan pajak between the tax bases of assets and liabilities and
dari aset dan liabilitas dan jumlah tercatatnya untuk their carrying amounts for financial reporting
tujuan pelaporan keuangan pada tanggal purposes at the reporting date.
pelaporan.
Aset pajak tangguhan diakui untuk seluruh Deferred tax assets are recognised for all
perbedaan temporer yang dapat dikurangkan dan deductible temporary differences and carry forward
akumulasi rugi pajak belum dikompensasi, bila of unused tax losses to the extent that it is probable
kemungkinan besar laba kena pajak akan tersedia that taxable profits will be available against which
sehingga perbedaan temporer dapat dikurangkan deductible temporary differences and the carry
tersebut, dan rugi pajak belum dikompensasi, forward of unused tax losses can be utilised,
dapat dimanfaatkan, kecuali: except:
i. jika aset pajak tangguhan timbul dari i. where the deferred tax asset relating to the
pengakuan awal aset atau liabilitas dalam deductible temporary difference arises from the
transaksi yang bukan transaksi kombinasi initial recognition of an asset or liability in a
bisnis dan tidak mempengaruhi laba akuntansi transaction that is not a business combination
maupun laba kena pajak/rugi pajak; atau and, at the time of the transaction, affects neither
the accounting profit nor taxable profit or loss; or
ii. dari perbedaan temporer yang dapat ii. in respect of deductible temporary differences
dikurangkan atas investasi pada entitas anak, associated with investments in subsidiaries,
aset pajak tangguhan hanya diakui bila besar deferred tax assets are recognised only to the
kemungkinannya bahwa beda temporer itu extent that the temporary differences will
tidak akan dibalik dalam waktu dekat dan laba probably reverse in the foreseeable future and
kena pajak dapat dikompensasi dengan beda taxable profit will be available against which the
temporer tersebut. temporary differences can be utilised.
Jumlah tercatat aset pajak tangguhan ditelaah The carrying amount of a deferred tax asset is
pada setiap tanggal pelaporan dan diturunkan reviewed at each reporting date and reduced to the
apabila laba kena pajak mungkin tidak memadai extent that it is no longer probable that sufficient
untuk mengkompensasi sebagian atau semua taxable profit will be available to allow all or part of
manfaat aset pajak tangguhan. Aset pajak the benefit of that deferred tax asset to be utilised.
tangguhan yang tidak diakui ditinjau ulang pada Unrecognised deferred tax assets are reassessed
setiap tanggal pelaporan dan akan diakui apabila at each reporting date. They are recognised to the
besar kemungkinan bahwa laba kena pajak pada extent that it has become probable that future
masa yang akan datang akan tersedia untuk taxable profit will allow the deferred tax assets to be
pemulihannya. recovered.
Pajak tangguhan terkait dengan pos-pos yang Deferred tax relating to items recognised outside
diakui di luar laba rugi diakui di luar laba rugi. Item profit or loss is recognised outside profit or loss.
pajak tangguhan diakui sesuai dengan transaksi Deferred tax items are recognized in correlation to
yang mendasarinya baik di PKL maupun secara the underlying transaction either in OCI or directly
langsung di ekuitas. in equity.
Manfaat pajak yang diperoleh sebagai bagian dari Tax benefits acquired as part of a business
kombinasi bisnis, tetapi tidak memenuhi kriteria combination but not satisfying the criteria for
untuk pengakuan terpisah pada tanggal tersebut, separate recognition at that date are recognised
diakui selanjutnya jika informasi baru tentang fakta subsequently if new information about facts and
dan keadaan berubah. Penyesuaian tersebut circumstances changes. The adjustment is either
diperlakukan sebagai pengurangan goodwill treated as a reduction in goodwill (as long as it does
(selama tidak melebihi goodwill) jika terjadi selama not exceed goodwill) if it was incurred during the
periode pengukuran atau diakui dalam laba rugi. measurement period or recognised in profit or loss.
Page 37
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/27 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
3. IKHTISAR INFORMASI KEBIJAKAN AKUNTANSI 3. SUMMARY OF MATERIAL ACCOUNTING
MATERIAL (lanjutan) POLICIES INFORMATION (continued)
p. Perpajakan (lanjutan) p. Taxation (continued)
Grup melakukan saling hapus aset pajak The Group offsets deferred tax assets and
tangguhan dan liabilitas pajak tangguhan jika deferred tax liabilities if and only if it has a legally
dan hanya jika memiliki hak yang berkekuatan enforceable right to set off current tax assets and
hukum untuk saling hapus aset pajak kini dan current tax liabilities and the deferred tax assets
liabilitas pajak kini dan aset pajak tangguhan and deferred tax liabilities relate to income taxes
dan liabilitas pajak tangguhan terkait dengan levied by the same taxation authority on either
pajak penghasilan yang dikenakan oleh otoritas the same taxable entity or different taxable
perpajakan yang sama atas baik entitas kena entities which intend either to settle current tax
pajak yang sama atau entitas kena pajak yang liabilities and assets on a net basis or to realise
berbeda yang bermaksud untuk menyelesaikan the assets and settle the liabilities
liabilitas dan aset pajak kini secara neto, atau simultaneously, in each future period in which
untuk merealisasikan aset dan menyelesaikan significant amounts of deferred tax liabilities or
liabilitas secara bersamaan, pada setiap periode assets are expected to be settled or recovered.
masa depan di mana jumlah liabilitas atau aset
pajak tangguhan yang signifikan diharapkan
untuk diselesaikan atau dipulihkan.
q. Penurunan nilai aset non-keuangan q. Impairment of non-financial assets
Pada setiap tanggal pelaporan, Grup menilai The Group assesses whether there is an
apakah terdapat indikasi suatu aset mengalami indication that an asset may be impaired at each
penurunan nilai. Jika terdapat indikasi tersebut reporting date. If such an indication exists or
atau pada saat pengujian penurunan nilai aset when annual impairment testing for an asset is
diperlukan, maka Grup membuat estimasi formal required, the Group estimates the asset’s
jumlah terpulihkan aset tersebut. recoverable amount.
Jumlah terpulihkan yang ditentukan untuk aset An asset’s recoverable amount is the higher of
individual adalah jumlah yang lebih tinggi antara an asset’s or Cash Generating Unit (“CGU’s”)
nilai wajar aset atau Unit Penghasil Kas (“UPK”) fair value less costs to sell and its value in use,
dikurangi biaya untuk menjual dengan nilai and is determined for an individual asset, unless
pakainya, kecuali aset tersebut tidak the asset does not generate cash inflows that are
menghasilkan arus kas masuk yang sebagian largely independent of those from other assets
besar independen dari aset atau kelompok aset or groups of assets. Where the carrying amount
lain. Jika nilai tercatat aset atau UPK lebih besar of an asset or CGU exceeds its recoverable
daripada jumlah terpulihkannya, maka aset amount, the asset is considered impaired and is
tersebut dipertimbangkan mengalami written down to its recoverable amount.
penurunan nilai dan nilai tercatat aset diturunkan
menjadi sebesar jumlah terpulihkannya
Grup mendasarkan perhitungan penurunan nilai The Group bases its impairment calculation on
pada rincian perhitungan anggaran atau detailed budgets and forecast calculations
prakiraan yang disusun secara terpisah untuk prepared separately for each of the Group’s
masing-masing UPK Grup atas aset individual CGUs to which the individual assets are
yang dialokasikan. Perhitungan anggaran dan allocated. These budgets and forecast
prakiraan ini secara umum mencakup periode calculations generally cover a period of each
kontrak terkait. Setelah periode yang contract. Beyond the forecasted period, the
dianggarkan proyeksi arus kas diestimasi estimated cash flows are determined by
dengan melakukan ekstrapolasi proyeksi yang extrapolating the forecasted cash flows using a
dianggarkan dengan menggunakan tingkat long-term growth rate.
pertumbuhan jangka panjang.
Page 38
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/28 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
3. IKHTISAR INFORMASI KEBIJAKAN AKUNTANSI 3. SUMMARY OF MATERIAL ACCOUNTING
MATERIAL (lanjutan) POLICIES INFORMATION (continued)
q. Penurunan nilai aset non-keuangan (lanjutan) q. Impairment of non-financial assets
(continued)
Dalam menghitung nilai pakai, estimasi arus kas In assessing the value in use, the estimated net
masa depan neto didiskontokan ke nilai kini future cash flows are discounted to their present
dengan menggunakan tingkat diskonto sebelum value using a pre-tax discount rate that reflects
pajak yang menggambarkan penilaian pasar kini current market assessments of the time value of
dari nilai waktu uang dan risiko spesifik atas money and the risks specific to the asset.
aset.
Kerugian penurunan nilai dari operasi yang Impairment losses of continuing operations, if
berkelanjutan, jika ada, diakui pada laba rugi any, are recognized in the profit or loss in those
sesuai dengan kategori biaya yang konsisten expense categories consistent with the functions
dengan fungsi dari aset yang diturunkan of the impaired asset.
nilainya.
Penilaian dilakukan pada akhir setiap tanggal Assessment is made at each reporting date as
pelaporan apakah terdapat indikasi bahwa rugi to whether there is any indication that previously
penurunan nilai yang telah diakui dalam tahun recognized impairment losses may no longer
sebelumnya mungkin tidak ada lagi atau exist or may have decreased. If such indication
mungkin telah menurun. Jika indikasi dimaksud exists, the asset’s or CGU’s recoverable amount
ditemukan, maka entitas mengestimasi jumlah is estimated. A previously recognized
terpulihkan aset atau UPK tersebut. Kerugian impairment loss is reversed only if there has
penurunan nilai yang telah diakui dalam tahun been a change in the assumptions used to
sebelumnya dibalik hanya jika terdapat determine the asset’s recoverable amount since
perubahan asumsi-asumsi yang digunakan the last impairment loss was recognized. If that
untuk menentukan jumlah terpulihkan aset is the case, the carrying amount of the asset is
tersebut sejak rugi penurunan nilai terakhir increased to its recoverable amount. The
diakui. Dalam hal ini, jumlah tercatat aset reversal is limited so that the carrying amount of
dinaikkan ke jumlah terpulihkannya. Pembalikan the assets does not exceed its recoverable
tersebut dibatasi sehingga jumlah tercatat aset amount, nor exceed the carrying amount that
tidak melebihi jumlah terpulihkannya maupun would have been determined, net of
jumlah tercatat, neto setelah penyusutan, depreciation, had no impairment loss been
seandainya tidak ada rugi penurunan nilai yang recognized for the asset in prior periods/years.
telah diakui untuk aset tersebut pada Reversal of an impairment loss is recognized in
peride/tahun sebelumnya. Pembalikan rugi the profit or loss. After such a reversal, the
penurunan nilai diakui pada laba rugi. Setelah depreciation charge on the said asset is adjusted
pembalikan tersebut, penyusutan aset tersebut in future periods to allocate the asset’s revised
disesuaikan di periode mendatang untuk carrying amount, less any residual value, on a
mengalokasikan jumlah tercatat aset yang systematic basis over its remaining useful life.
direvisi, dikurangi nilai sisanya, dengan dasar
yang sistematis selama sisa umur manfaatnya.
Page 39
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/29 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
3. IKHTISAR INFORMASI KEBIJAKAN AKUNTANSI 3. SUMMARY OF MATERIAL ACCOUNTING
MATERIAL (lanjutan) POLICIES INFORMATION (continued)
r. Instrumen keuangan r. Financial instruments
Instrumen keuangan adalah setiap kontrak yang A financial instrument is any contract that gives
menambah nilai aset keuangan bagi satu entitas rise to a financial asset of one entity and a
dan liabilitas keuangan atau ekuitas bagi entitas financial liability or equity instrument of another
lain. entity.
Aset keuangan Financial assets
Pengakuan awal dan pengukuran awal Initial recognition and measurement
Pada pengakuan awal, Grup mengukur aset At initial recognition, the Group measures a
keuangan pada nilai wajarnya ditambah biaya financial asset at its fair value plus transaction
transaksi, dalam hal aset keuangan tidak diukur costs, in the case of a financial asset not at fair
pada nilai wajar melalui laba rugi (“NWLR”). value through profit or loss (“FVTPL”).
Piutang usaha
Agar aset keuangan diklasifikasikan dan diukur In order for a financial asset to be classified and
pada biaya perolehan diamortisasi atau measured at amortized cost or FVOCI, it needs to
NWPKL, aset keuangan harus menghasilkan give rise to cash flows that are ‘solely payments
arus kas yang semata dari pembayaran pokok of principal and interest (“SPPI”)’ on the principal
dan bunga (“SPPB”) dari jumlah pokok terutang. amount outstanding. This assessment is referred
Penilaian ini disebut sebagai uji SPPB dan to as the SPPI test and is performed at an
dilakukan pada tingkat instrumen instrument level.
Model bisnis Grup untuk mengelola aset The Group’s business model for managing
keuangan mengacu pada bagaimana mereka financial assets refers to how it manages its
mengelola aset keuangannya untuk financial assets in order to generate cash flows.
menghasilkan arus kas. Model bisnis The business model determines whether cash
menentukan apakah arus kas akan dihasilkan flows will result from collecting contractual cash
dari penerimaan arus kas kontraktual, penjualan flows, selling the financial assets, or both.
aset keuangan, atau keduanya.
Pengukuran selanjutnya Subsequent measurement
Untuk tujuan pengukuran selanjutnya, aset For purposes of subsequent measurement,
keuangan diklasifikasikan dalam empat financial assets are classified in four categories:
kategori:
• Aset keuangan pada biaya perolehan • Financial assets at amortized cost (debt
diamortisasi (instrumen utang), instruments),
• Aset keuangan pada NWPKL dengan • Financial assets at FVOCI with recycling of
pendauran laba dan rugi kumulatif cumulative gains and losses (debt
(instrumen utang), instruments),
• Aset keuangan pada NWPKL tanpa • Financial assets designated at FVOCI with
pendauran laba dan rugi kumulatif setelah no recycling of cumulative gains and losses
penghentian pengakuan (instrumen upon derecognition (equity instruments),
ekuitas), dan and
• Nilai wajar melalui laba rugi (NWLR). • Fair value through profit or loss (FVTPL).
Pengukuran selanjutnya dari aset keuangan The subsequent measurement of financial assets
tergantung kepada klasifikasi masing-masing depends on their classification as described
aset keuangan seperti berikut ini: below:
Page 40
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/30 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
3. IKHTISAR INFORMASI KEBIJAKAN AKUNTANSI 3. SUMMARY OF MATERIAL ACCOUNTING
MATERIAL (lanjutan) POLICIES INFORMATION (continued)
r. Instrumen keuangan (lanjutan) r. Financial instruments (continued)
Aset keuangan (lanjutan) Financial assets (continued)
Pengukuran selanjutnya (lanjutan) Subsequent measurement (continued)
Aset keuangan pada biaya perolehan Financial assets at amortized cost (debt
diamortisasi (instrumen utang) instruments)
Grup mengukur aset keuangan pada biaya The Group measures financial assets at
perolehan diamortisasi jika kedua kondisi berikut amortized cost if both of the following conditions
terpenuhi: are met:
• Aset keuangan dimiliki dalam model bisnis • The financial asset is held within a business
dengan tujuan untuk memiliki aset model with the objective to hold financial
keuangan dalam rangka mendapatkan assets in order to collect contractual cash
arus kas kontraktual, dan flows, and
• Persyaratan kontraktual dari aset • The contractual terms of the financial asset
keuangan menghasilkan arus kas pada give rise on specified dates to cash flows
tanggal tertentu yang merupakan SPPB that are SPPI on the principal amount
dari jumlah pokok terutang. outstanding.
Aset keuangan yang diukur pada biaya Financial assets at amortized cost are
perolehan diamortisasi selanjutnya diukur subsequently measured using the effective
dengan menggunakan metode suku bunga interest (“EIR”) method and are subject to
efektif (“SBE”) dan menjadi subjek penurunan impairment. Gains and losses are recognized in
nilai. Keuntungan dan kerugian diakui dalam profit or loss when the asset is derecognized,
laba rugi pada saat aset dihentikan modified or impaired.
pengakuannya, dimodifikasi atau diturunkan
nilainya.
Aset keuangan Grup yang diukur pada biaya The Group’s financial assets at amortized cost
perolehan diamortisasi termasuk kas dan setara includes cash and cash equivalents, restricted
kas, kas yang dibatasi penggunaannya, piutang cash, trade and other receivables.
usaha dan piutang lain-lain.
Aset keuangan pada NWPKL dengan Financial assets at FVOCI with recycling of
pendauran laba dan rugi kumulatif (instrumen cumulative gains and losses (debt instruments)
utang)
Untuk instrumen utang yang diukur pada For debt instruments at FVOCI, interest income,
NWPKL, pendapatan bunga, revaluasi mata foreign exchange revaluation and impairment
uang asing dan kerugian penurunan nilai atau losses or reversals are recognized in the
pembalikan diakui dalam laporan laba rugi dan statement of profit or loss and computed in the
dihitung dengan cara yang sama seperti untuk same manner as for financial assets measured
aset keuangan yang diukur pada biaya at amortized cost. The remaining fair value
perolehan diamortisasi. Perubahan nilai wajar changes are recognized in OCI. Upon
yang tersisa diakui di PKL. Pada saat derecognition, the cumulative fair value change
penghentian pengakuan, perubahan nilai wajar recognized in OCI is recycled to profit or loss.
kumulatif yang diakui di PKL direklasifikasi ke
laba rugi.
Grup tidak memiliki instrumen utang yang diukur The Group does not have debt instruments at
pada NWPKL. FVOCI.
Page 41
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/31 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
3. IKHTISAR INFORMASI KEBIJAKAN AKUNTANSI 3. SUMMARY OF MATERIAL ACCOUNTING
MATERIAL (lanjutan) POLICIES INFORMATION (continued)
r. Instrumen keuangan (lanjutan) r. Financial instruments (continued)
Aset keuangan (lanjutan) Financial assets (continued)
Pengukuran selanjutnya (lanjutan) Subsequent measurement (continued)
Aset keuangan pada NWPKL tanpa pendauran Financial assets designated at FVOCI with no
laba dan rugi kumulatif setelah penghentian recycling of cumulative gains and losses upon
pengakuan (instrumen ekuitas) derecognition (equity instruments)
Pada pengakuan awal, Grup dapat memilih Upon initial recognition, the Group can elect to
untuk menetapkan klasifikasi yang tidak dapat classify irrevocably its investments in equity
dikembalikan atas investasi pada instrumen instruments at FVOCI when they meet the
ekuitas sebagai NWPKL jika memenuhi definisi definition of equity under PSAK 232: Financial
ekuitas sesuai PSAK 232: Instrumen keuangan: instruments: Presentation and are not held for
Penyajian dan tidak dimiliki untuk trading. The classification is determined on an
diperdagangkan. Klasifikasi ditentukan atas instrument-by-instrument basis.
basis instrumen per instrumen.
Keuntungan dan kerugian atas aset keuangan Gains and losses on these financial assets are
ini tidak pernah didaur ke laba rugi, dan aset never recycled to profit or loss, and these
keuangan ini tidak menjadi subjek penurunan financial assets are not subject to impairment
nilai. Dividen diakui sebagai penghasilan lain- assessment. Dividends are recognized as other
lain dalam laba rugi pada saat hak atas income in the profit or loss when the right of
pembayaran telah ditetapkan. payment has been established.
Grup memilih untuk mengklasifikasi secara The Group elected to classify irrevocably its
takterbatalkan investasi ekuitas pada Grup equity investments in Pertamina Group under this
Pertamina masuk dalam kategori ini category.
Aset Keuangan pada nilai wajar melalui laba rugi Financial assets at fair value through profit or
(“NWLR”) loss (“FVTPL”)
Aset keuangan pada NWLR tercatat dalam Financial assets at FVTPL are carried in the
laporan posisi keuangan pada nilai wajar statement of financial position at fair value with
dengan perubahan neto nilai wajar yang diakui net changes in fair value recognized in the
dalam laporan laba rugi. statement of profit or loss.
Grup tidak memiliki aset keuangan yang diukur The Group does not have financial assets at
pada NWLR. FVTPL.
Page 42
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/32 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
3. IKHTISAR INFORMASI KEBIJAKAN AKUNTANSI 3. SUMMARY OF MATERIAL ACCOUNTING
MATERIAL (lanjutan) POLICIES INFORMATION (continued)
r. Instrumen keuangan (lanjutan) r. Financial instruments (continued)
Aset keuangan (lanjutan) Financial assets (continued)
Penghentian pengakuan Derecognition
Aset keuangan (atau, sesuai dengan A financial asset (or, where applicable, a part of a
kondisinya, bagian dari aset keuangan atau financial asset or part of a group of similar
bagian dari kelompok aset keuangan serupa) financial assets) is primarily derecognized (i.e.,
terutama dihentikan pengakuannya (yaitu, removed from the Group’s consolidated
dihapuskan dari laporan posisi keuangan statement of financial position) when:
konsolidasian Grup) ketika:
• Hak untuk menerima arus kas dari aset • The rights to receive cash flows from the
telah berakhir; atau asset have expired; or
• Grup telah mengalihkan haknya untuk • The Group has transferred its rights to
menerima arus kas dari aset atau receive cash flows from the asset or has
menanggung kewajiban untuk membayar assumed an obligation to pay the received
arus kas yang diterima tersebut secara cash flows in full without material delay to a
penuh tanpa penundaan yang material third party under a ‘pass-through’
kepada pihak ketiga berdasarkan arrangement; and either (a) the Group has
kesepakatan ‘pass-through’, dan salah transferred substantially all the risks and
satu dari (a) Grup telah mengalihkan rewards of the asset, or (b) the Group has
secara substansial seluruh risiko dan neither transferred nor retained
manfaat atas aset, atau (b) Grup tidak substantially all the risks and rewards of the
mengalihkan maupun tidak memiliki asset, but has transferred control of the
secara substansial atas seluruh risiko dan asset.
manfaat atas aset, tetapi telah
mengalihkan kendali atas aset
Liabilitas keuangan Financial liabilities
Pengakuan dan pengukuran awal Initial recognition and measurement
Liabilitas keuangan diklasifikasikan, pada Financial liabilities are classified, at initial
pengakuan awal, sebagai liabilitas keuangan recognition, as financial liabilities at FVTPL, loans
yang diukur pada NWLR, utang dan pinjaman and borrowings, or as derivatives designated as
atau derivatif ditetapkan sebagai instrumen hedging instruments in an effective hedge, as
lindung nilai pada lindung nilai yang efektif, appropriate.
sesuai dengan kondisinya.
Semua liabilitas keuangan diakui pada nilai All financial liabilities are recognized initially at
wajar saat pengakuan awal dan, dalam hal fair value and, in the case of loans and
liabilitas keuangan dilklasifikasi sebagai utang borrowings and payables, net of directly
dan pinjaman, diakui pada nilai wajar setelah attributable transaction costs.
dikurangi biaya transaksi yang dapat
diatribusikan secara langsung.
Grup menetapkan liabilitas keuangannya The Group designates its financial liabilities as
sebagai utang dan pinjaman, seperti utang loans and borrowings, such as trade and other
usaha dan lain-lain, utang obligasi, pinjaman payables, bond payable, long term loan related
jangka panjang pihak berelasi, biaya masih party, accrued expense and lease liability.
harus dibayar dan liabilitas sewa.
Page 43
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/33 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
3. IKHTISAR INFORMASI KEBIJAKAN AKUNTANSI 3. SUMMARY OF MATERIAL ACCOUNTING
MATERIAL (lanjutan) POLICIES INFORMATION (continued)
r. Instrumen keuangan (lanjutan) r. Financial instruments (continued)
Liabilitas keuangan (lanjutan) Financial liabilities (continued)
Pengukuran selanjutnya Subsequent measurement
Liabilitas keuangan pada NWLR Financial liabilities at FVTPL
Liabilitas keuangan yang diukur pada NWLR Financial liabilities at FVTPL include financial
mencakup liabilitas keuangan yang dimiliki liabilities held for trading and financial liabilities
untuk diperdagangkan dan liabilitas keuangan designated upon initial recognition as at FVTPL.
yang diukur pada NWLR yang ditetapkan saat
pengakuan awal.
Liabilitas keuangan diklasifikasikan sebagai Financial liabilities are classified as held for
dimiliki untuk diperdagangkan, jika liabilitas trading if they are incurred for the purpose of
keuangan tersebut diperoleh untuk tujuan dibeli repurchasing in the near term.
kembali dalam waktu dekat.
Liabilitas keuangan yang diukur pada NWLR Financial liabilities designated upon initial
yang ditetapkan saat pengakuan awal harus recognition at FVTPL are designated at the initial
memenuhi kriteria dalam PSAK 109 dan date of recognition, and only if the criteria in
ditetapkan pada tanggal pengakuan awal. Grup PSAK 109 are satisfied. The Group has not
tidak menetapkan liabilitas keuangan apapun designated any financial liability as at FVTPL.
sebagai liabilitas yang diukur pada NWLR.
Liabilitas keuangan pada biaya perolehan Financial liabilities at amortized cost (loan
diamortisasi (utang dan pinjaman) borrowings)
i) Utang dan pinjaman jangka panjang i) Long-term interest-bearing loans and
yang dikenakan bunga borrowings
Setelah pengakuan awal, utang dan Subsequent to initial recognition, long-
pinjaman jangka panjang yang berbunga term interest-bearing loans and
diukur pada biaya perolehan yang borrowings are measured at amortized
diamortisasi dengan menggunakan acquisition costs using EIR method. At
metode SBE. Pada tanggal pelaporan, the reporting dates, accrued interest is
biaya bunga yang masih harus dibayar recorded separately from the associated
dicatat secara terpisah, dari pokok borrowings within the current liabilities
pinjaman terkait, dalam bagian liabilitas section. Gains and losses are
jangka pendek. Keuntungan dan recognized in the profit or loss when the
kerugian diakui pada laba rugi ketika liabilities are derecognized as well as
liabilitas dihentikan pengakuannya through the EIR amortization process.
maupun melalui proses amortisasi
menggunakan metode SBE.
Biaya amortisasi dihitung dengan Amortized cost is calculated by taking
mempertimbangkan setiap diskonto atau into account any discount or premium on
premium atas akusisi dan komisi atau acquisition and fees or costs that are an
biaya yang merupakan bagian tidak integral part of the EIR. The EIR
terpisahkan dari SBE. Amortisasi SBE amortization is included in finance costs
dicatat sebagai beban keuangan pada in the profit or loss.
laba rugi.
Page 44
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/34 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
3. IKHTISAR INFORMASI KEBIJAKAN AKUNTANSI 3. SUMMARY OF MATERIAL ACCOUNTING
MATERIAL (lanjutan) POLICIES INFORMATION (continued)
r. Instrumen keuangan (lanjutan) r. Financial instruments (continued)
Liabilitas keuangan (lanjutan) Financial liabilities (continued)
Pengukuran selanjutnya (lanjutan) Subsequent measurement (continued)
Liabilitas keuangan pada biaya perolehan Financial liabilities at amortized cost (loan
diamortisasi (utang dan pinjaman) (lanjutan) borrowings) (continued)
ii) Utang dan akrual ii) Payables and accruals
Liabilitas untuk utang usaha, utang lain-lain Liabilities for trade payables, other payables
dan biaya masih harus dibayar dinyatakan and accrued expenses are stated at carrying
sebesar jumlah tercatat (jumlah nosional), amounts (notional amounts), which
yang kurang lebih sebesar nilai wajarnya. approximate their fair values.
Penghentian pengakuan Derecognition
Suatu liabilitas keuangan dihentikan A financial liability is derecognized when the
pengakuannya pada saat kewajiban yang obligation under the contract is discharged or
ditetapkan dalam kontrak berakhir atau cancelled or expires.
dibatalkan atau kadaluwarsa.
Ketika sebuah liabilitas keuangan ditukar When an existing financial liability is replaced by
dengan liabilitas keuangan lain dari pemberi another from the same lender on substantially
pinjaman yang sama atas persyaratan yang different terms, or the terms of an existing liability
secara substansial berbeda, atau bila are substantially modified, such an exchange or
persyaratan dari liabilitas keuangan tersebut modification is treated as derecognition of the
secara substansial dimodifikasi, pertukaran atau original liability and recognition of a new liability,
modifikasi persyaratan tersebut dicatat sebagai and the difference in the respective carrying
penghentian pengakuan liabilitas keuangan amounts is recognized in the profit or loss.
orisinal dan pengakuan liabilitas keuangan baru,
dan selisih antara nilai tercatat masing-masing
liabilitas keuangan tersebut diakui pada laba
rugi.
Saling hapus instrument keuangan Offsetting of financial instruments
Aset keuangan dan liabilitas keuangan disaling Financial assets and financial liabilities are offset,
hapuskan dan nilai netonya disajikan dalam and the net amount reported in the consolidated
laporan posisi keuangan konsolidasian jika, dan statement of financial position if, and only if, there
hanya jika, terdapat hak secara hukum untuk is a currently enforceable legal right to offset the
melakukan saling hapus atas jumlah tercatat recognized amounts and there is an intention to
dari aset keuangan dan liabilitas keuangan settle on a net basis, or to realize the assets and
tersebut dan terdapat intensi untuk settle the liabilities simultaneously.
menyelesaikan secara neto, atau untuk
merealisasikan aset dan menyelesaikan
liabilitas secara bersamaan.
Page 45
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/35 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
3. IKHTISAR INFORMASI KEBIJAKAN AKUNTANSI 3. SUMMARY OF MATERIAL ACCOUNTING
MATERIAL (lanjutan) POLICIES INFORMATION (continued)
r. Instrumen keuangan (lanjutan) r. Financial instruments (continued)
Pengukuran nilai wajar Fair value measurement
Grup mengukur pada pengakuan awal The Group initially measures financial
instrumen keuangan pada nilai wajar, dan aset instruments at fair value, as well as the assets
dan liabilitas yang diakuisisi pada kombinasi and liabilities of the acquirees, based on
bisnis. Grup juga mengukur jumlah terpulihkan business combinations. It also measures
dari UPK tertentu berdasarkan nilai wajar specific recoverable amounts of the CGU using
dikurangi biaya pelepasan. fair value less cost of disposal (“FVLCD”).
Nilai wajar adalah harga yang akan diterima dari Fair value is the price that would be received to
menjual suatu aset atau harga yang akan sell an asset or paid to transfer a liability in an
dibayar untuk mengalihkan suatu liabilitas orderly transaction between market participants
dalam transaksi teratur antara pelaku pasar at the measurement date. The fair value
pada tanggal pengukuran. Pengukuran nilai measurement is based on the presumption that
wajar mengasumsikan bahwa transaksi untuk the transaction to sell the asset or transfer the
menjual aset atau mengalihkan liabilitas terjadi: liability takes place either:
i) Di pasar utama untuk aset atau liabilitas i) In the principal market for the asset or
tersebut, atau liability, or
ii) Jika tidak terdapat pasar utama, di pasar ii) In the absence of a principal market, in the
yang paling menguntungkan untuk aset atau most advantageous market for the asset or
liabilitas tersebut. liability.
Pasar utama atau pasar yang paling The principal or the most advantageous market
menguntungkan tersebut harus dapat diakses must be accessible to the Group.
oleh Grup.
Nilai wajar dari aset atau liabilitas diukur dengan The fair value of an asset or a liability is measured
menggunakan asumsi yang akan digunakan using the assumptions that market participants
pelaku pasar ketika menentukan harga aset would use when pricing the asset or liability,
atau liabilitas tersebut, dengan asumsi bahwa assuming that market participants act in their
pelaku pasar bertindak dalam kepentingan economic best interest.
ekonomi terbaiknya.
Pengukuran nilai wajar dari suatu aset A fair value measurement of a non-financial
nonkeuangan memperhitungkan kemampuan asset takes into account a market participant's
pelaku pasar untuk menghasilkan manfaat ability to generate economic benefits by using
ekonomik dengan menggunakan aset dalam the asset in its highest and best use or by selling
penggunaan tertinggi dan terbaiknya atau it to another market participant that would use
dengan menjualnya kepada pelaku pasar lain the asset in its highest and best use.
yang akan menggunakan aset tersebut pada
penggunaan tertinggi dan terbaiknya.
Grup menggunakan teknik penilaian yang The Group uses valuation techniques that are
sesuai dengan keadaan dan data yang appropriate in the circumstances and for which
memadai tersedia untuk mengukur nilai wajar, sufficient data are available to measure fair value,
dengan memaksimalkan masukan (input) yang maximizing the use of relevant observable inputs
dapat diamati (observable) yang relevan dan and minimizing the use of unobservable inputs.
meminimalkan masukan (input) yang tidak
dapat diamati (unobservable).
Page 46
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/36 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
3. IKHTISAR INFORMASI KEBIJAKAN AKUNTANSI 3. SUMMARY OF MATERIAL ACCOUNTING
MATERIAL (lanjutan) POLICIES INFORMATION (continued)
s. Penurunan nilai dari aset keuangan s. Impairment of financial assets
i. Aset yang dicatat berdasarkan biaya i. Assets carried at amortized cost
perolehan diamortisasi
Grup menilai dengan dasar perkiraan masa The Group assesses on a forward-looking
yang akan datang kerugian kredit basis the expected credit losses (“ECL”)
ekspektasian (“ECL”) terkait dengan associated with its debt instruments carried
instrumen utangnya yang dicatat pada at amortised cost, fair value through profit or
biaya perolehan diamortisasi, nilai wajar loss (“FVTPL”) and fair value through other
melalui laba rugi (“FVTPL”) dan nilai wajar comprehensive income (“FVOCI”). The
melalui penghasilan komprehensif lain impairment methodology applied depends
(“FVOCI”). Metodologi penurunan nilai yang on whether there has been a significant
diterapkan tergantung pada apakah telah increase in credit risk. Note 30.I.b details
terjadi peningkatan risiko kredit yang how the group determines whether there
signifikan. Catatan 30.I.b merinci has been a substantial increase in credit
bagaimana grup menentukan apakah telah risk.
terjadi peningkatan risiko kredit yang
signifikan.
Untuk piutang dagang, Grup menerapkan For trade receivables, the Group applies the
pendekatan yang disederhanakan yang simplified approach permitted by PSAK 109,
diizinkan oleh PSAK 109, yang which requires expected lifetime losses to
mensyaratkan kerugian seumur hidup yang be recognised from the receivables initial
diharapkan harus diakui dari pengakuan recognition.
awal piutang.
Jika terdapat bukti objektif bahwa kerugian Suppose there is objective evidence that an
penurunan niIai telah terjadi, maka jumlah impairment loss has occurred; the amount
kerugian tersebut diukur sebesar selisih of loss is measured as the difference
nilai tercatat aset dengan nilai kini estimasi between the asset’s carrying amount and
arus kas masa depan (tidak termasuk the present value of estimated future cash
kerugian kredit di masa depan yang belum flows (excluding future credit losses that
terjadi) yang didiskonto dengan have not been incurred) discounted at the
menggunakan suku bunga efektif awal dari financial asset’s original effective interest
aset tersebut. Nilai tercatat aset tersebut rate. The asset's carrying amount is directly
dikurangi, baik secara langsung maupun reduced or through a provision account. The
menggunakan pos provisi. Jumlah kerugian amount of the loss is recognised in the profit
yang terjadi diakui pada laporan laba rugi. or loss.
Jika, pada periode berikutnya, jumlah If, in a subsequent period, the amount of the
kerugian penurunan nilai berkurang dan impairment loss decreases and the
pengurangan tersebut dapat dikaitkan decrease can be related objectively to an
secara objektif dengan peristiwa yang event occurring after the impairment was
terjadi setelah penurunan nilai diakui recognised (such as an improvement in the
(seperti meningkatnya peringkat kredit debtor’s credit rating), the previously
debitur), maka kerugian penurunan nilai recognised impairment loss will be reversed
yang sebelumnya diakui akan dipulihkan, either directly or by adjusting the provision
baik secara langsung, atau dengan account. The reversal amount is recognised
menyesuaikan pos provisinya. Jumlah in the profit or loss and cannot exceed what
pemulihan tersebut diakui pada laporan the amortised cost would have been had the
laba-rugi dan jumlahnya tidak boleh impairment not been recognized when the
mengakibatkan nilai tercatat aset keuangan impairment was reversed.
melebihi biaya perolehan diamortisasi pada
tanggal pemulihan dilakukan seandainya
tidak ada penurunan nilai.
Page 47
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/37 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
3. IKHTISAR INFORMASI KEBIJAKAN AKUNTANSI 3. SUMMARY OF MATERIAL ACCOUNTING
MATERIAL (lanjutan) POLICIES INFORMATION (continued)
t. Informasi segmen t. Segment information
Segmen adalah komponen Grup yang dapat A segment is a distinguishable component of the
dibedakan dalam kegiatan operasional Grup Group that is engaged either in the Group’s
(segmen usaha), atau dalam pembagian lokasi operational activities (operating segment) or in
geografis dimana Grup melakukan kegiatan the classification of geographical locations
operasional (segmen geografis), yang where the Group conducts operational activities
merupakan subyek yang mempunyai risiko dan (geographic segment), which is subject to risks
manfaat yang berbeda dari segmen lainnya. and rewards that are different from those of other
segments.
Segmen pendapatan, beban, hasil, aset dan Segment revenue, expenses, results, assets,
liabilitas termasuk hal-hal yang dapat and liabilities include items directly attributable to
diatribusikan secara langsung terhadap sebuah a segment and those that can be allocated
segmen dan juga yang dapat dialokasikan pada reasonably to that segment.
dasar yang wajar pada segmen tersebut.
Untuk tujuan manajemen, Grup dibagi menjadi For management purposes, the Group is
segmen operasi berdasarkan pembagian lokasi organized into operating segments based on the
geografis dari kegiatan operasional Grup yang classification of geographical locations where
dikelola secara independen oleh masing-masing the Group conducts operational activities. The
pengelola segmen yang bertanggung jawab atas respective segment managers are
kinerja dari masing-masing segmen. independently managed and responsible for the
performance of the respective segments under
their charge.
Para pengelola segmen melaporkan secara The segment managers report directly to
langsung kepada manajemen yang secara management, who regularly review the segment
teratur mengkaji laba segmen sebagai dasar results to allocate resources to the segments
untuk mengalokasikan sumber daya ke masing- and assess their performance. Note 32 provides
masing segmen dan untuk menilai kinerja additional disclosures on each segment,
segmen. Pengungkapan tambahan pada including the factors used to identify the
masing-masing segmen terdapat dalam Catatan reportable segments and the measurement
32, termasuk faktor yang digunakan untuk basis of segment information.
mengidentifikasi segmen yang dilaporkan dan
dasar pengukuran informasi segmen.
u. Dividen tunai u. Cash dividends
Perusahaan mengakui liabilitas untuk The Company recognises a liability to pay
membayar dividen ketika distribusi telah a dividend when the distribution is authorised,
disetujui, dan distribusi tidak lagi atas and the distribution is no longer at the
kebijaksanaan Perusahaan. Sesuai dengan discretion of the Company. As per the
hukum perusahaan di Indonesia, distribusi corporate laws of Indonesia, a distribution is
diperbolehkan jika disetujui oleh pemegang permitted when the shareholders approve it. A
saham. Jumlah yang sesuai diakui secara corresponding amount is recognised directly in
langsung dalam ekuitas. equity.
Page 48
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/38 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
3. IKHTISAR INFORMASI KEBIJAKAN AKUNTANSI 3. SUMMARY OF MATERIAL ACCOUNTING
MATERIAL (lanjutan) POLICIES INFORMATION (continued)
v. Tambahan modal disetor v. Additional paid-in capital
Tambahan modal disetor diakui pada saat Grup Additional paid-in capital is recognised when the
menerima setoran berupa kas atau aset non-kas Group receives a transfer of cash or non-cash
dari pemegang saham. Selisih nilai transaksi assets from the shareholders. The difference in
restrukturisasi entitas sepengendali juga dicatat the value of restructuring transactions between
di akun ini. Tambahan modal disetor ini disajikan entities under common control is also recorded
sebagai kelompok ekuitas pada laporan posisi in this account. Additional paid-in capital is
keuangan. presented as equity in the statement of financial
position.
w. Bonus produksi w. Production bonus
Sesuai dengan Peraturan Pemerintah No. 28 In accordance with Government Regulation
Tahun 2016, Grup sebagai pengusaha panas No. 28 of 2016, the Group, as a geothermal
bumi berkewajiban membayar bonus produksi producer, is obliged to pay a production bonus to
kepada pemerintah daerah di mana wilayah the regional government where the geothermal
kerja panas bumi berada. Bonus produksi working area is located. The production bonus is
dikenakan sebesar 1% atas pendapatan kotor charged at 1% of gross revenue from the sale of
dari penjualan uap panas bumi dan 0,5% atas geothermal steam and 0.5% of gross revenue
pendapatan kotor dari penjualan listrik. from the sale of electricity. The production bonus
Perhitungan bonus produksi dari pemegang Izin calculation from the Geothermal Permit holders
Panas Bumi dilakukan secara tahunan, is made annually, while the production bonus
sedangkan perhitungan dari pemegang kuasa calculation from the holders of geothermal
pengusahaan sumber daya panas bumi, resource exploitation authority, the JOC
pemegang KOB, dan pemegang izin contractors, and the holders of the geothermal
pengusahaan sumber daya panas bumi resource exploitation license every quarter.
dilakukan secara triwulanan.
Bonus produksi yang telah dibayarkan tersebut The paid production bonus is reimbursable from
diberikan penggantian dari setoran bagian the Government’s portion of the operating
Pemerintah (Catatan 3p). Penggantian tersebut income (Note 3p). The reimbursement will be
akan dilakukan oleh Pemerintah setelah made by the Government after the geothermal
pengusaha panas bumi membayar setoran producer paid such Government’s portion.
bagian Pemerintah.
x. Laba per saham x. Earnings per share
Laba per saham dihitung berdasarkan rata-rata Earnings per share is calculated based on the
tertimbang jumlah saham yang yang beredar weighted average number of issued and fully
selama periode yang bersangkutan. paid shares during the period.
Apabila jumlah saham biasa yang beredar If the number of ordinary shares outstanding is
meningkat tanpa disertai peningkatan sumber increased without an increase in resources, the
daya, maka jumlah saham biasa yang beredar number of ordinary shares outstanding before
sebelum peristiwa tersebut disesuaikan dengan the event is adjusted the proportionate change in
perubahan proporsional atas jumlah saham the number of ordinary shares outstanding
beredar seolah-olah peristiwa tersebut terjadi before the event is adjusted for the proportionate
pada permulaan dari periode sajian paling awal. change in the number of ordinary shares
outstanding as if the event had occurred at the
beginning of the earliest period presented.
Page 49
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/39 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
3. IKHTISAR INFORMASI KEBIJAKAN AKUNTANSI 3. SUMMARY OF MATERIAL ACCOUNTING
MATERIAL (lanjutan) POLICIES INFORMATION (continued)
y. Kompensasi berbasis saham y. Shared-based payments
Grup memberikan Management and Employee The Group granted directors and key employees
Stock Option Program ("MESOP") dengan harga a Management and Employee Stock Option
dan periode vesting yang telah ditetapkan Program ("MESOP") based on specific criteria at
kepada manajemen dan karyawan berdasarkan a predetermined price and vesting period.
kriteria tertentu.
Transaksi kompensasi berbasis saham yang Equity-settled share-based payment
diselesaikan dengan instrumen ekuitas transactions
Biaya transaksi yang diselesaikan dengan The cost of equity-settled transactions is
ekuitas ditentukan oleh nilai wajar pada tanggal determined by the fair value at the date when the
pemberian dibuat menggunakan model grant is made using an appropriate valuation
penilaian yang sesuai. model.
Biaya tersebut diakui sebagai beban imbalan That cost is recognised in employee benefits
kerja, bersama dengan peningkatan ekuitas expense and a corresponding increase in equity
(tambahan modal saham), selama periode (additional paid-in capital) over the period in
dimana layanan dan, jika ada, kondisi kinerja which the service and, where applicable, the
terpenuhi (periode vesting). Biaya kumulatif performance conditions are fulfilled (the vesting
yang diakui untuk transaksi yang diselesaikan period). The cumulative expense recognised for
secara ekuitas pada setiap tanggal pelaporan equity-settled transactions at each reporting
sampai tanggal vesting mencerminkan sejauh date until the vesting date reflects the extent to
mana periode vesting telah berakhir dan which the vesting period has expired and the
estimasi terbaik Grup tentang jumlah instrumen Group's best estimate of the number of equity
ekuitas yang pada akhirnya akan terutang. instruments that will ultimately vest. The
Beban atau kredit dalam laba rugi untuk suatu expense or credit in the statement of profit or loss
periode merupakan pergerakan dalam biaya for a period represents the movement in
kumulatif yang diakui pada awal dan akhir cumulative expense recognised at the beginning
periode tersebut. and end of that period.
Kondisi kinerja layanan dan bukan pasar tidak Service and non-market performance conditions
diperhitungkan ketika menentukan nilai wajar are not considered when determining the grant
saat pemberian penghargaan, tetapi date fair value of awards. Still, the likelihood of
kemungkinan kondisi yang dipenuhi dinilai the conditions being met is assessed as part of
sebagai bagian dari estimasi terbaik Grup the Group's best estimate of the number of
tentang jumlah instrumen ekuitas yang pada equity instruments that will ultimately vest.
akhirnya akan diberikan. Kondisi kinerja pasar Market performance conditions are reflected
tercermin dalam nilai wajar tanggal hibah. within the grant date fair value. Any other
Kondisi lain yang terkait dengan penghargaan, conditions attached to an award without an
tetapi tanpa persyaratan layanan terkait, associated service requirement are considered
dianggap sebagai kondisi non-vesting. Kondisi non-vesting. Non-vesting conditions are
non-vesting tercermin dalam nilai wajar dari reflected in the fair value of an award and lead to
penghargaan dan mengarah pada pembebasan an immediate expensing of an award unless
langsung dari penghargaan kecuali ada juga there are also service and/or performance
kondisi layanan dan/atau kinerja. conditions.
Page 50
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/40 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
3. IKHTISAR INFORMASI KEBIJAKAN AKUNTANSI 3. SUMMARY OF MATERIAL ACCOUNTING
MATERIAL (lanjutan) POLICIES INFORMATION (continued)
y. Kompensasi berbasis saham (lanjutan) y. Share-based payments (continued)
Transaksi kompensasi berbasis saham yang Equity-settled share-based payment
diselesaikan dengan instrumen ekuitas transactions (continued)
(lanjutan)
Tidak ada biaya yang diakui untuk penghargaan No expense is recognised for awards that do not
yang pada akhirnya tidak diberikan karena ultimately vest because non-market
kinerja bukan pasar dan/atau kondisi layanan performance and/or service conditions have not
belum dipenuhi. Jika penghargaan termasuk been met. Where awards include a market or
kondisi pasar atau non-vesting, transaksi non-vesting condition, the transactions are
diperlakukan sebagai vested terlepas dari treated as vested irrespective of whether the
apakah kondisi pasar atau non-vesting market or non-vesting condition is satisfied,
dipenuhi, asalkan semua kinerja dan/atau provided all other performance and/or service
kondisi layanan lainnya dipenuhi. conditions are satisfied.
Ketika ketentuan penghargaan ekuitas- When the terms of an equity-settled award are
diselesaikan dimodifikasi, biaya minimum yang modified, the minimum expense recognised is
diakui adalah tanggal hibah nilai wajar dari the grant date fair value of the unmodified award,
penghargaan yang tidak dimodifikasi, asalkan provided the original terms of the award are met.
ketentuan asli dari penghargaan tersebut An additional cost, measured as at the date of
terpenuhi. Biaya tambahan, yang diukur pada modification, is recognised for any modification
tanggal modifikasi, diakui untuk setiap modifikasi that increases the total fair value of the share-
yang meningkatkan nilai wajar total transaksi based payment transaction or is otherwise
kompensasi berbasis saham, atau sebaliknya beneficial to the employee. Where the entity or
menguntungkan bagi karyawan. Jika suatu the counterparty cancels an award, any
putusan dibatalkan oleh entitas atau oleh pihak remaining element of the award's fair value is
lawan, elemen yang tersisa dari nilai wajar dari expensed immediately through profit or loss. In
penghargaan dibebankan langsung melalui laba the event that the employees and management
rugi. Dalam hal karyawan dan manajemen resign before the vesting period, then the option
melakukan pengunduran diri sebelum periode rights are void, and all equity that the Group has
vesting, maka hak opsi tersebut gugur dan recorded is cancelled.
seluruh ekuitas yang telah dicatat oleh Grup
dibatalkan.
Efek dilutif dari kompensasi berbasis saham The dilutive effect of share-based payments is
tercermin sebagai dilusi saham tambahan dalam reflected as additional share dilution in the
perhitungan laba per saham dilusian. computation of diluted earnings per share.
Page 51
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/41 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
3. IKHTISAR INFORMASI KEBIJAKAN AKUNTANSI 3. SUMMARY OF MATERIAL ACCOUNTING
MATERIAL (lanjutan) POLICIES INFORMATION (continued)
z. Investasi pada ventura bersama z. Investment in joint venture
Ventura bersama merupakan pengaturan A joint venture is a joint arrangement in which the
bersama antara beberapa pihak yang parties that share joint control have rights to the
melakukan kesepakatan pengendalian bersama net assets of the arrangement. Joint ventures
yang memiliki hak atas aset neto pengaturan are accounted for using the equity method after
tersebut. Ventura bersama dicatat initially being recognised at cost in the statement
menggunakan metode ekuitas, setelah pada of financial position.
awalnya diakui sebagai biaya pada laporan
posisi keuangan.
Metode ekuitas Equity method
Sesuai metode ekuitas, investasi pada awalnya Under the equity method, the investment is
dicatat pada biaya perolehan dan selanjutnya initially recognised at cost and adjusted
disesuaikan untuk mengakui bagian investor thereafter to recognise the investor's share of the
atas laba rugi pasca akuisisi dari investee atas investee's post-acquisition profits or losses in
laba rugi, dan bagiannya dalam pergerakan profit or loss and its share of the investee's
pendapatan komprehensif lainnya dari investee movements in other comprehensive income in
atas pendapatan komprehensif lainnya. other comprehensive income.
Jika bagian Grup atas kerugian ventura bersama When the Group’s share of losses in a joint
sama dengan atau melebihi kepentingannya venture equals or exceeds its interest in the joint
pada ventura bersama, Grup menghentikan venture, the Group does not recognise further
pengakuan bagian kerugiannya, kecuali Grup losses unless it has incurred legal or
memiliki kewajiban atau melakukan pembayaran constructive obligations or made payments on
atas nama ventura bersama. behalf of the joint venture.
Keuntungan yang belum terealisasi atas Unrealised gains on transactions between the
transaksi antara Grup dengan ventura bersama group and its joint ventures are eliminated to the
dieliminasi sebesar kepentingan Grup dalam extent of the Group’s interest in these joint
ventura bersama tersebut. Kerugian yang belum ventures. Unrealised losses are also eliminated
terealisasi juga dieliminasi kecuali transaksi unless the transaction provides evidence of an
tersebut memberikan bukti adanya penurunan impairment of the asset transferred. Accounting
nilai aset yang dialihkan. Kebijakan akuntansi policies of the joint ventures have been changed
ventura bersama telah diubah jika diperlukan where necessary to ensure consistency with the
untuk memastikan konsistensi dari kebijakan policies adopted by the Group.
yang diterapkan oleh Grup.
Dividen yang diterima dan yang akan diterima Dividends received or receivable from joint
dari ventura bersama diakui sebagai pengurang ventures are recognised as a reduction in the
jumlah tercatat investasi. carrying amount of the investment.
Pada setiap tanggal pelaporan, Grup The Group determines at each reporting date
menentukan apakah terdapat bukti objektif whether there is any objective evidence that the
bahwa telah terjadi penurunan nilai pada investment in the joint venture is impaired. If this
investasi pada ventura bersama. Jika demikian, is the case, the Group calculates the impairment
maka Grup menghitung besarnya penurunan as the difference between the recoverable
nilai sebagai selisih antara jumlah yang amount of the joint venture and its carrying
terpulihkan dan nilai tercatat atas investasi pada value. It recognises the amount in profit or loss.
ventura bersama dan mengakui selisih tersebut
pada laba rugi.
Page 52
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/42 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
3. IKHTISAR INFORMASI KEBIJAKAN AKUNTANSI 3. SUMMARY OF MATERIAL ACCOUNTING
MATERIAL (lanjutan) POLICIES INFORMATION (continued)
z. Investasi pada ventura bersama (lanjutan) z. Investment in joint venture (continued)
Pelepasan Disposal
Investasi pada ventura bersama dihentikan Investment in a joint venture is derecognised
pengakuannya apabila Grup tidak lagi memiliki when the Group loses significant influence, and
pengaruh signifikan. Grup mengukur investasi any retained equity interest in the entity is
yang tersisa sebesar nilai wajar. Selisih antara remeasured at its fair value. The difference
jumlah tercatat investasi yang tersisa pada between the carrying amount of the retained
tanggal hilangnya pengaruh signifikan dan nilai interest at the date when significant influence is
wajarnya diakui dalam laba rugi. lost, and its fair value is recognised in profit or
loss.
Keuntungan dan kerugian yang timbul dari Gains and losses arising from partial disposals
pelepasan sebagian atau dilusi yang timbul pada or dilutions of investment in a joint venture in
investasi pada ventura bersama dimana which significant influence is retained are
pengaruh signifikan masih dipertahankan diakui recognised in profit or loss, and only a
dalam laba rugi dan hanya suatu bagian proportionate share of the amount previously
proporsional atas jumlah yang telah diakui recognised in other comprehensive income is
sebelumnya pada pendapatan komprehensif reclassified to profit or loss where appropriate.
lainnya yang direklasifikasi ke laba rugi.
4. ESTIMASI DAN PERTIMBANGAN AKUNTANSI 4. CRITICAL ACCOUNTING ESTIMATES AND
YANG PENTING JUDGEMENTS
Penyusunan laporan keuangan konsolidasian sesuai Preparing consolidated financial
dengan Standar Akuntansi Keuangan di Indonesia statements conforming to Indonesian Financial
mewajibkan manajemen untuk membuat estimasi Accounting Standards requires management to
dan asumsi yang mempengaruhi jumlah-jumlah yang make judgments about estimations and assumptions
dilaporkan dari pendapatan, beban, aset dan that affect the amounts reported on income,
liabilitas, dan pengungkapan liabilitas kontinjensi expenses, assets and liabilities, and disclosures of
pada tanggal pelaporan. Ketidakpastian mengenai contingent liabilities at the reporting date. Estimation
asumsi dan estimasi tersebut dapat mengakibatkan uncertainty may cause adjustments to the carrying
penyesuaian nilai tercatat aset dan liabilitas dalam amounts of assets and liabilities within the next
periode pelaporan berikutnya. reporting period.
Estimasi dan pertimbangan terus-menerus Estimates and judgements are continually evaluated
dievaluasi berdasarkan pengalaman historis dan and based on historical experience and other factors,
faktor-faktor lain, termasuk ekspektasi peristiwa including expectations of future events that are
masa depan yang diyakini wajar berdasarkan kondisi believed to be reasonable under the circumstances.
yang ada. Hasil aktual dapat berbeda dengan jumlah However, the actual results may differ from these
yang diestimasi. Estimasi dan asumsi yang memiliki estimates. The estimates and assumptions that
pengaruh signifikan terhadap jumlah tercatat aset significantly affect the carrying amounts of assets
dan liabilitas diungkapkan di bawah ini. and liabilities are disclosed below.
Page 53
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/43 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
4. ESTIMASI DAN PERTIMBANGAN AKUNTANSI 4. CRITICAL ACCOUNTING ESTIMATES AND
YANG PENTING (lanjutan) JUDGEMENTS (continued)
Estimasi dan Asumsi Estimates and Assumptions
- Biaya eksplorasi dan evaluasi - Exploration and evaluation expenditures
Kebijakan akuntansi Grup untuk biaya The Group’s accounting policy for the
eksplorasi dan evaluasi mengakibatkan biaya exploration and evaluation of expenditure results
tertentu dikapitalisasi untuk sebuah wilayah in certain items of expenditure being capitalised
kerja yang dianggap dapat dipulihkan oleh for an area of interest where it is considered
eksploitasi di masa depan atau penjualan atau di likely to be recoverable through future
mana kegiatan tersebut belum mencapai tahap exploitation or sale or where the activities have
tertentu yang memungkinkan dilakukan not reached a stage which permits a reasonable
penilaian yang wajar atas keberadaan energi assessment of the existence of geothermal
panas bumi. Kebijakan ini mengharuskan energy. This policy requires management to
manajemen untuk membuat estimasi dan make specific estimates and assumptions about
asumsi tertentu atas peristiwa dan keadaan di future events and circumstances, particularly
masa depan, khususnya apakah operasi whether an economically viable extraction
eksploitasi dapat dilaksanakan secara operation can be established.
ekonomis.
Setiap perkiraan dan asumsi tersebut dapat Any such estimates and assumptions may
berubah seiring tersedianya informasi baru. Jika, change as new information becomes available.
setelah dilakukan kapitalisasi atas biaya If, after capitalising the expenditure under the
berdasarkan kebijakan ini, suatu pertimbangan policy, a judgement is made that the recovery of
dibuat bahwa pemulihan biaya dianggap tidak the expenditure is unlikely, the relevant
dimungkinkan, biaya yang telah dikapitalisasi capitalised amounts will be written off to the
tersebut akan dibebankan ke dalam laporan laba statement of profit or loss and other
rugi dan penghasilan komprehensif lain. comprehensive income.
- Penyusutan - Depreciation
Grup mencatat nilai sumur dan instalasi dengan The Group records the value of the wells and
nilai perolehan dikurangi akumulasi penyusutan installations at cost less accumulated
dan biaya-biaya yang berkaitan dengan depreciation and any impairment charges. The
penurunan nilai. Nilai perolehan sumur dan cost of the wells and installations includes the
instalasi termasuk biaya berwujud dan tidak tangible and intangible expenditures to prepare
berwujud untuk mempersiapkan aset tersebut the assets for initial steam and electricity
dapat memproduksi uap dan listrik. Sumur dan generation. After reducing the estimated residual
instalasi disusutkan dengan metode garis lurus values, wells and installations are depreciated
selama estimasi umur ekonomis sumur dan straight-line over the asset’s estimated useful
instalasi, setelah memperhitungkan nilai sisa. lives.
Page 54
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/44 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
4. ESTIMASI DAN PERTIMBANGAN AKUNTANSI 4. CRITICAL ACCOUNTING ESTIMATES AND
YANG PENTING (lanjutan) JUDGEMENTS (continued)
Estimasi dan Asumsi (lanjutan) Estimates and Assumptions (continued)
- Penyusutan (lanjutan) - Depreciation (continued)
Pertimbangan penting dan estimasi meliputi hal- The critical judgements and estimates involved
hal sebagai berikut: are:
- Estimasi masa manfaat aset antara - Estimated useful lives of the assets range
5 sampai 40 tahun. Meskipun demikian from an estimated 5 to 40 years. However,
masa manfaat nyata sumur dan instalasi the actual life of the wells and installations
dapat berbeda yang disebabkan oleh may be different depending on many factors
beberapa faktor seperti karakteristik uap, such as steam characteristics, and the rate
dan tingkat keausan peralatan of wear and tear of the equipment may
mempengaruhi masa manfaat menjadi lebih result in a shorter or longer life.
panjang atau lebih pendek.
- Nilai sisa sulit diestimasi berdasarkan masa - Residual values are difficult to estimate
manfaat aset tetap, karena adanya given the long lives of wells and
ketidakpastian seperti kondisi ekonomi dan installations, the uncertainty of future
harga baja bekas di masa yang akan economic conditions and the future price of
datang, yang dianggap sebagai scrap steel, which is considered the primary
pertimbangan utama dalam menentukan determinant of the residual price.
nilai sisa.
Saat ini Grup melakukan estimasi nilai sisa The Group estimates residual values annually
secara tahunan berdasarkan evaluasi terbaik based on the best useful life and residual value
atas hasil penilaian masa manfaat dan nilai sisa estimation of fixed asset.
aset tetap.
Jika estimasi masa manfaat ekonomis tidak If the estimated economic useful life is incorrect
benar atau kondisi lingkungan berubah, estimasi or circumstances change such that the
masa manfaat ekonomis harus disesuaikan, rugi estimated economic useful life must be revised,
penurunan nilai aset atau penambahan biaya an impairment loss or additional depreciation
penyusutan harus diperhitungkan untuk periode expense could result in future periods. A
yang akan datang. Penurunan masa manfaat decrease in the useful life of the assets or a fall
aset atau penurunan nilai residu akan in the residual value would increase the annual
mengakibatkan beban penyusutan tahunan depreciation charge and potentially result in an
meningkat dan berpotensi mengakibatkan rugi impairment loss. If the residual value is
penurunan nilai. Jika nilai sisa lebih dari yang di overestimated, it would reduce the yearly
estimasikan maka akan mengurangi biaya depreciation and overstate the value of the
penyusutan dan lebih catat atas nilai aset. assets.
Page 55
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/45 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
4. ESTIMASI DAN PERTIMBANGAN AKUNTANSI 4. CRITICAL ACCOUNTING ESTIMATES AND
YANG PENTING (lanjutan) JUDGEMENTS (continued)
Estimasi dan Asumsi (lanjutan) Estimates and Assumptions (continued)
- Kompensasi berbasis saham - Share-based compensation
Perusahaan mengukur beban dari transaksi Group measures the cost of equity-settled
yang diselesaikan dengan instrumen ekuitas transactions (MESOP) with management and
(MESOP) kepada manajemen dan karyawan employees by reference to the fair value of the
dengan mengacu pada nilai wajar dari instrumen equity instruments at the date they are granted.
ekuitas pada tanggal instrument tersebut Estimating fair value for share-based payment
diberikan (grant). Dalam mengestimasi nilai transactions requires determining the most
wajar dari transaksi pembayaran berbasis appropriate valuation model, which depends on
saham memerlukan penentuan model penilaian the grant's terms and conditions. This estimate
yang paling tepat, yang tergantung pada also requires determining the most appropriate
persyaratan dan kondisi yang diberikan. inputs to the valuation model, including, among
Estimasi ini juga memerlukan penentuan input others, option exercise price, the current price
yang paling tepat ke dalam model penilaian yang of the underlying stock, the expected life of the
mencakup antara lain, harga pelaksanaan opsi, stock option, share volatility and risk-free
harga terkini yang mendasari saham, ekspektasi interest rate and making assumptions about
umur dari opsi saham, tingkat volatilitas saham them. The assumptions and models used for
dan suku bunga bebas risiko serta penentuan estimating fair value for share-based payment
asumsi atas input tersebut. Asumsi-asumsi dan transactions are disclosed in Notes 3y and 18b.
model penilaian yang dipakai untuk
mengestimasi nilai wajar transaksi pembayaran
berbasis saham ini diungkapkan dalam Catatan
3y dan 18b.
- Penyusutan aset hak-guna - Depreciation of right-of-use assets.
Aset hak guna disusutkan sepanjang waktu yang Right-of-use assets are depreciated on a
lebih pendek antara lama masa manfaat aset straight-line basis over the shorter of the asset’s
dan jangka waktu sewa menggunakan metode useful life and the lease term. If the group is
garis lurus. Jika grup cukup yakin untuk reasonably certain to exercise a purchase
melaksanakan opsi pembelian, aset hak guna option, the right-of-use asset is depreciated
disusutkan selama masa manfaat aset yang over the underlying assets’ useful life.
mendasarinya.
- Penurunan nilai aset non-keuangan - Non-financial asset impairment
Sesuai dengan kebijakan akuntansi Grup, setiap Following the Group’s accounting policies, each
aset atau unit penghasil kas dievaluasi pada asset or cash-generating unit is evaluated every
setiap periode pelaporan untuk menentukan ada reporting period to determine any impairment
tidaknya indikasi penurunan nilai aset. Jika indications. If any such indication exists, a formal
terdapat indikasi tersebut, akan dilakukan estimate of the recoverable amount is
perkiraan atas nilai aset yang dapat dipulihkan performed, and an impairment loss recognised
kembali dan kerugian akibat penurunan nilai to the extent that the carrying amount exceeds
akan diakui sebesar selisih antara nilai tercatat the recoverable amount. The recoverable
aset dengan nilai yang dapat dipulihkan kembali amount of an asset or cash-generating unit is
dari aset tersebut. Jumlah nilai yang dapat measured at the higher of fair value, fewer costs
dipulihkan kembali dari sebuah aset atau to sell, and lower value in use.
kelompok aset penghasil kas diukur
berdasarkan nilai yang lebih tinggi antara nilai
wajar dikurangi biaya untuk menjual dan
perhitungan nilai pakai.
Page 56
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/46 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
4. ESTIMASI DAN PERTIMBANGAN AKUNTANSI 4. CRITICAL ACCOUNTING ESTIMATES AND
YANG PENTING (lanjutan) JUDGEMENTS (continued)
Estimasi dan Asumsi (lanjutan) Estimates and Assumptions (continued)
- Penurunan nilai aset non-keuangan (lanjutan) - Non-financial asset impairment (continued)
Aset yang memiliki masa manfaat yang tak Assets with an indefinite useful life - for example,
terbatas, seperti goodwill atau aset tak berwujud goodwill or intangible assets not ready to use -
yang belum siap untuk digunakan, tidak are not subject to amortisation and are tested
diamortisasi dan diuji setiap tahun untuk annually for impairment.
penurunan nilai.
Penentuan nilai wajar dan nilai pakai Determining fair value and value in use requires
membutuhkan manajemen untuk membuat management to make estimates and
estimasi dan asumsi atas produksi uap atau assumptions about expected steam or electricity
listrik yang diharapkan, harga uap atau listrik, production, steam or electricity prices, operating
biaya operasi, serta belanja modal di masa costs, and future capital expenditures.
depan.
Manajemen menggunakan estimasi terbaik Management uses the best estimation based on
berdasarkan data yang tersedia pada tanggal available data at the financial reporting date in
pelaporan keuangan dalam penentuan sumber resource and reserve bookings and the
daya dan cadangan serta skenario development scenario on geothermal projects
pengembangan untuk proyek panas bumi yang with impairment indication.
terdapat indikasi penurunan nilai.
- Pengukuran instrumen ekuitas - Equity instrument measurement
Grup mengukur investasi di instrumen ekuitas The Group measures equity investment where
dimana Grup tidak memiliki pengaruh signifikan the Group has no significant influence or control
ataupun kontrol pada nilai wajarnya. Nilai wajar over its fair value. The fair value of an asset is
atas suatu aset ditentukan berdasarkan metode determined based on the discounted cash flow
arus kas diskonto, yang dihitung berdasarkan methods, calculated based on management’s
asumsi dan estimasi manajemen. Perubahan assumptions and estimates. Changing the key
asumsi penting, termasuk asumsi tingkat assumptions, including the discount rates or the
diskonto atau tingkat pertumbuhan dalam growth rate assumptions in the cash flow
proyeksi arus kas dan asumsi harga, dapat projections and price assumptions, could
memengaruhi perhitungan nilai yang dapat materially affect the calculations of recoverable
diperoleh kembali secara material. amounts.
- Penurunan nilai aset keuangan - Impairment of financial assets
Grup menggunakan matriks provisi untuk The Group uses a provision matrix to calculate
menghitung ECL atas piutang usaha. Tarif ECL for trade receivables. The provision rates
provisi didasarkan pada hari yang lewat jatuh are based on days past due for groupings of
tempo untuk mengelompokan pelanggan ke various customer segments with similar loss
segmen yang memiliki pola kerugian serupa. patterns. The provision matrix is initially based
Matriks provisi awalnya berdasarkan tarif default on the Group’s historical observed default rates.
yang diamati Grup secara historis.
Page 57
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/47 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
4. ESTIMASI DAN PERTIMBANGAN AKUNTANSI 4. CRITICAL ACCOUNTING ESTIMATES AND
YANG PENTING (lanjutan) JUDGEMENTS (continued)
Estimasi dan Asumsi (lanjutan) Estimates and Assumptions (continued)
- Penurunan nilai aset keuangan (lanjutan) - Impairment of financial assets (continued)
Grup akan mengkalibrasi matriks tersebut untuk The Group will calibrate the matrix to adjust the
menyesuaikan pengalaman kerugian kredit historical credit loss experience with forward-
historis dengan informasi kedepan. Misalnya, jika looking information. For instance, if forecast
prakiraan kondisi ekonomi diperkirakan economic conditions are expected to deteriorate
memburuk selama tahun depan dapat over the next year, leading to increased defaults
menyebabkan peningkatan jumlah default di in the Group’s industry sector, the historical
sektor usaha Grup, tingkat default historis default rates are adjusted. The historically
disesuaikan. Pada setiap tanggal pelaporan, tarif observed default rates are updated at every
default yang diamati secara historis diperbarui dan reporting date, and changes in the forward-
perubahan dalam estimasi ke depan dianalisa looking estimates are analysed.
kembali.
Penilaian korelasi antara tingkat default yang The assessment of the correlation between
dapat diamati secara historis, taksiran kondisi historical observed default rates, forecast
ekonomi dan ECL adalah estimasi yang signifikan. economic conditions, and ECLs is a significant
Jumlah ECL sensitif terhadap perubahan keadaan estimate. The amount of ECLs is sensitive to
dan taksiran kondisi ekonomi. Pengalaman changes in circumstances and forecast
kerugian kredit historis Grup dan perkiraan kondisi economic conditions. The Group’s historical
ekonomi mungkin juga tidak mewakili aktual credit loss experience and forecast of economic
default pelanggan yang sebenarnya di masa conditions may also not represent
depan. the customer’s actual default in the future.
- Imbalan kerja - Employee benefits
Penentuan liabilitas imbalan kerja Grup Determining the Group’s employee benefits
bergantung pada pemilihan asumsi yang liability depends on the independent actuaries'
digunakan oleh aktuaris independen dalam selection of certain assumptions when
menghitung jumlah-jumlah tersebut. Asumsi calculating such amounts. Those assumptions
tersebut termasuk antara lain, tingkat diskonto, include discount rates, salary increase rate,
tingkat kenaikan gaji, tingkat kematian, usia mortality rate, retirement age and resignation
pensiun dan tingkat pengunduran diri. Hasil aktual rate. Actual results that differ from the Group’s
yang berbeda dari asumsi yang ditetapkan Grup assumptions are recognised in other
diakui dalam penghasilan komprehensif lain. comprehensive income. While the Group
Sementara Grup berkeyakinan bahwa asumsi believes that its assumptions are reasonable
tersebut adalah wajar dan sesuai, perbedaan and appropriate, significant differences in the
signifikan pada hasil aktual atau perubahan Group's actual results or substantial changes in
signifikan dalam asumsi yang ditetapkan Grup the Group’s assumptions may materially affect
dapat mempengaruhi secara material liabilitas its estimated liabilities for employee benefits and
imbalan kerja dan beban imbalan kerja neto yang net employee benefits expense recognised in
diakui dalam laba rugi dan penghasilan profit or loss and other comprehensive income.
komprehensif lain.
- Beban pajak kini - Current tax expenses
Grup mengakui beban pajak kini berdasarkan The Group recognises current tax expense
estimasi penghasilan kena pajak periode berjalan based on the estimated taxable income for the
yang dihitung berdasarkan tarif pajak yang period computed using the prevailing tax rates.
berlaku.
Page 58
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/48 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
4. ESTIMASI DAN PERTIMBANGAN AKUNTANSI 4. CRITICAL ACCOUNTING ESTIMATES AND
YANG PENTING (lanjutan) JUDGEMENTS (continued)
Estimasi dan Asumsi (lanjutan) Estimates and Assumptions (continued)
- Aset pajak tangguhan - Deferred tax assets
Aset pajak tangguhan diakui untuk semua Deferred tax assets are recognised for all
perbedaan temporer yang boleh dikurangkan, deductible temporary differences to the extent
sepanjang besar kemungkinan perbedaan that taxable income will probably be available in
temporer yang boleh dikurangkan dapat future years against which the deductible
dimanfaatkan untuk mengurangi penghasilan temporary differences can be utilised. Significant
kena pajak pada masa depan. Estimasi management estimates are required to
signifikan oleh manajemen disyaratkan dalam determine the amount of deferred tax assets that
menentukan total aset pajak tangguhan yang can be recognised, based upon the likely timing
dapat diakui, berdasarkan saat penggunaan dan and the level of the future taxable income,
tingkat penghasilan kena pajak serta strategi together with future tax planning strategies.
perencanaan pajak masa depan.
Pertimbangan dalam Penentuan Kebijakan Judgments in Applying the Accounting Policies
Akuntansi
Pertimbangan berikut ini dibuat oleh manajemen The following judgments are made by management
dalam rangka penerapan kebijakan akuntansi Grup in the process of applying the Group’s accounting
yang memiliki pengaruh paling signifikan atas jumlah policies that have the most significant effects on the
yang diakui dalam laporan keuangan konsolidasian: amounts recognised in the consolidated financial
statements:
- Klasifikasi Aset dan Liabilitas Keuangan - Classification of Financial Assets and Financial
Liabilities
Grup menetapkan klasifikasi atas aset dan The Group determines the classifications of
liabilitas tertentu sebagai aset keuangan dan certain assets and liabilities as financial assets
liabilitas keuangan dengan mempertimbangkan and financial liabilities by judging if they meet the
apakah definisi yang ditetapkan PSAK 109 definition outlined in PSAK 109. Accordingly, the
dipenuhi. Dengan demikian, aset keuangan dan financial assets and liabilities are accounted for
liabilitas keuangan diakui sesuai dengan following the Group’s accounting policies
kebijakan akuntansi Grup seperti diungkapkan disclosed in Note 3r.
pada Catatan 3r.
- Penentuan mata uang fungsional - Determination of functional currency
Mata uang fungsional dari masing-masing The functional currency of each Group entity is
entitas Grup adalah mata uang dari lingkungan the currency of the primary economic
ekonomi utama dimana entitas beroperasi. environment in which the entity operates. The
Penentuan mata uang fungsional mungkin determination of the functional currency may
membutuhkan pertimbangan karena beberapa require consideration due to some complexities,
kompleksitas, seperti Grup bertransaksi di lebih such as the Group transacting in more than one
dari satu mata uang dalam kegiatan bisnis currency during its day-to-day business. The
sehari-hari. Mata uang tersebut adalah mata currency is the currency of the primary economic
uang pada lingkungan ekonomi utama di mana environment in which the entity operates.
entitas beroperasi.
Page 59
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/49 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
5. KAS DAN SETARA KAS 5. CASH AND CASH EQUIVALENTS
30 September
(Tidak Diaudit)/
September 30 31 Desember/
(Unaudited), December 31,
2025 2024
Kas pada bank 153.123 155.191 Cash in banks
Deposito jangka pendek 475.000 500.000 Short-term deposits
Jumlah 628.123 655.191 Total
Rincian kas dan setara kas berdasarkan mata uang dan The details of cash and cash equivalents based on currency and
masing-masing bank adalah sebagai berikut: by individual bank are as follows:
30 September
(Tidak Diaudit)/
September 30 31 Desember/
(Unaudited), December 31,
2025 2024
Kas pada bank: Cash in banks:
Rekening rupiah: Rupiah accounts:
PT Bank Mandiri PT Bank Mandiri
(Persero) Tbk (“Bank Mandiri”) 22.974 9.669 (Persero) Tbk (“Bank Mandiri”)
PT Bank Negara Indonesia PT Bank Negara Indonesia
(Persero) Tbk (“Bank BNI”) 349 401 (Persero) Tbk (“Bank BNI”)
PT Bank Rakyat Indonesia PT Bank Rakyat Indonesia
(Persero) Tbk (“Bank BRI”) 332 115 (Persero) Tbk (“Bank BRI”)
Subjumlah 23.655 10.185 Subtotal
Rekening dolar AS: US dollar accounts:
Bank BRI 70.012 73.276 Bank BRI
Bank Mandiri 57.854 70.939 Bank Mandiri
Bank BNI 774 54 Bank BNI
Subjumlah 128.640 144.269 Subtotal
Rekening euro: Euro accounts:
Bank BNI 828 737 Bank BNI
Subjumlah 828 737 Subtotal
Jumlah kas pada bank 153.123 155.191 Total cash in banks
Deposito jangka pendek: Short-term bank deposits:
Rekening dolar AS: US dollar accounts:
Bank BJB 250.000 150.000 Bank BJB
Maybank 200.000 - Maybank
Bank BTN 25.000 200.000 Bank BTN
Bank Mandiri - 150.000 Bank Mandiri
Jumlah deposito Total short-term
jangka pendek 475.000 500.000 bank deposits
Total cash and
Jumlah kas dan setara kas 628.123 655.191 cash equivalents
Page 60
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/50 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
5. KAS DAN SETARA KAS (lanjutan) 5. CASH AND CASH EQUIVALENTS (continued)
Tingkat bunga per tahun deposito berjangka per Annual interest rates on time deposits per annum are
tahun adalah sebagai berikut: as follows:
30 September
(Tidak Diaudit)/
September 30 31 Desember/
(Unaudited), December 31,
2025 2024
Dolar Amerika Serikat 4,00 – 6,05% 5,71 – 7,15% US dollar
Bank-bank di atas adalah bank milik negara. Dengan The above banks are state-owned banks. As such,
demikian, bank-bank tersebut merupakan entitas they are Government-related entities.
berelasi dengan Pemerintah.
6. PIUTANG USAHA DAN PIUTANG LAIN-LAIN 6. TRADE RECEIVABLES AND OTHER
RECEIVABLES
a. Piutang usaha a. Trade receivables
30 September
(Tidak Diaudit)/
September 30 31 Desember/
(Unaudited), December 31,
2025 2024
Dolar Amerika Serikat United States Dollar
Pihak yang berelasi Related parties
(Catatan 26f) 159.344 124.627 (Note 26f)
Pihak ketiga 3.427 3.498 Third parties
Jumlah 162.771 128.125 Total
Dolar Amerika Serikat United States Dollar
Belum jatuh tempo 3.427 3.498 Not due
Jatuh tempo kurang Less than three
dari tiga bulan 157.288 119.246 months overdue
Jatuh tempo lebih dari More than three
dari tiga bulan kurang months less than
dari dua belas bulan - 3.325 twelve months overdue
Jatuh tempo lebih dari More than
dua belas bulan 2.056 2.056 twelve months overdue
Jumlah 162.771 128.125 Total
Pada tanggal 30 September 2025 dan 31 As of September 30, 2025, and December 31,
Desember 2024, piutang usaha kepada pihak 2024, trade receivables to related parties
berelasi dalam mata uang dolar AS yang timbul denominated in US dollars arising from own
atas transaksi pendapatan operasi sendiri operations amounted to US$92,148 and
masing-masing sebesar US$92.148 dan US$57,534, respectively, and arising from
US$57.534 dan yang timbul atas transaksi pass- pass-through transactions between the Group
through antara Grup dan kontraktor KOB and KOB contractors amounted to US$67,196
masing-masing sebesar US$67.196 dan and US$67,093, respectively (Notes 3m).
US$67.093 (Catatan 3m).
Manajemen berkeyakinan bahwa seluruh Management believes that trade receivables
piutang usaha dapat ditagihkan, sehingga tidak are fully collectable, hence, no impairment
diperlukan adanya penyisihan penurunan nilai. provision is required. As of September 30,
Pada tanggal 30 September 2025 dan 31 2025, and December 31, 2024, no trade
Desember 2024 tidak terdapat piutang usaha receivable was used as collateral.
yang digunakan sebagai jaminan.
Page 61
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/51 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
6. PIUTANG USAHA DAN PIUTANG LAIN-LAIN 6. TRADE RECEIVABLES AND OTHER
(lanjutan) RECEIVABLES (continued)
b. Piutang lain-lain b. Other receivables
30 September
(Tidak Diaudit)/
September 30 31 Desember/
(Unaudited), December 31,
2025 2024
Pihak yang berelasi (Catatan 26g) 9.245 11.570 Related parties (Note 26g)
Pihak ketiga 57 98 Third parties
Jumlah 9.302 11.668 Total
Bagian lancar 2.281 4.139 Current portion
Bagian tidak lancar 7.021 7.529 Non-current portion
Pada tanggal 30 September 2025, piutang lain- On September 30, 2025, the current portion of
lain pihak - berelasi bagian lancar merupakan other receivables - related parties represents a
piutang atas penggantian bonus produksi dari receivable arising from production bonus
DJA, piutang dividen dari PHE dan piutang reimbursement from DJA, dividen receivable
penjualan kredit karbon dari PPI. from PHE, and carbon credit sales from PPI.
Piutang lain-lain pihak - berelasi tidak lancar The other receivable-related party non-current
merupakan piutang atas penyerahan unit portion represents receivables arising from
transmisi kepada PLN sesuai PJBL untuk the transfer of transmission units to PLN under
Lahendong Unit 5 dan 6 dan Karaha yang the Lahendong Unit 5 and 6 and Karaha ESCs,
penyelesaiannya menggunakan porsi tertentu which settlement will be received as part of
dari harga penjualan selama jangka waktu future revenue during the sales contract.
perjanjian.
Manajemen berkeyakinan bahwa seluruh Management believes other receivables are
piutang lain-lain dapat ditagihkan, sehingga fully collectable; hence, no impairment
tidak diperlukan penyisihan penurunan nilai. provision is required.
Page 62
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/52 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
7. PERSEDIAAN 7. INVENTORIES
30 September
(Tidak Diaudit)/
September 30 31 Desember/
(Unaudited), December 31,
2025 2024
Material pemboran 20.176 9.242 Drilling materials
Suku cadang 7.515 7.309 Spare parts
Pipa 4.226 3.937 Pipes
Pelumas dan bahan kimia 58 60 Lubricants and chemicals
Dikurangi: Less:
Penyisihan penurunan nilai (1.994) (2.062) Allowance for decline in value
Jumlah 29.981 18.486 Total
Mutasi penyisihan atas penurunan nilai selama periode Changes in the balance of allowance for decline in
pelaporan adalah sebagai berikut: value on the reporting period were as follows:
30 September
(Tidak Diaudit)/
September 30 31 Desember/
(Unaudited), December 31,
2025 2024
Saldo awal (2.062) (409) Beginning balance
Penyisihan penurunan nilai 68 (1.653) Allowance for decline in value
Jumlah (1.994) (2.062) Total
Pada tanggal 30 September 2025 dan 31 Desember As of September 30, 2025, and December 31, 2024,
2024, persediaan tidak diasuransikan atas risiko inventories are not insured against fire, theft, and
kebakaran, pencurian, dan risiko lain yang mungkin other potential risks, as management believes these
terjadi, karena manajemen beranggapan bahwa risks do not pose a significant threat to the business.
risiko tersebut tidak berdampak signifikan pada
bisnis.
Berdasarkan hasil pengkajian ulang keadaan fisik Based on an assessment of the status of physical
persediaan pada tanggal 30 September 2025 dan 31 inventories as of September 30, 2025, and
Desember 2024, manajemen berkeyakinan bahwa December 31, 2024, management believes that the
jumlah penyisihan penurunan nilai telah mencukupi allowance for the decline in value is adequate to
untuk menutup penurunan nilai persediaan usang, cover the allowance for obsolete, unusable, and
tidak terpakai dan lambat pergerakannya. slow-moving materials.
8. BIAYA DIBAYAR DI MUKA 8. PREPAYMENTS
Biaya dibayar di muka terdiri dari sewa dibayar Prepaid expenses, consisting of prepaid rent, prepaid
di muka, asuransi dibayar di muka dan perjalanan insurance, and prepaid travel expenses, on
dinas dibayar di muka dimana pada tanggal September 30, 2025, and December 31, 2024
30 September 2025 dan 31 Desember 2024 masing- amounted to US$325 and US$122, respectively.
masing sebesar US$325 dan US$122.
Page 63
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/53 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
9. ASET TETAP 9. FIXED ASSETS
30 September (Tidak Diaudit)/September 30 (Unaudited), 2025
Saldo awal/ Saldo akhir/
Beginning Penambahan/ Pengurangan/ Reklasifikasi/ Ending
balance Additions Deduction Reclassification balance
Harga perolehan: Acquisition costs:
Tanah dan hak atas tanah 19.220 - - 2.633 21.853 Land and land rights
Sumur panas bumi 1.112.038 - - 151.442 1.263.480 Geothermal wells
Instalasi 779.678 - - 140.522 920.200 Installations
Bangunan 192.048 - - 70.656 262.704 Buildings
Harta benda bergerak 32.353 - - 1.110 33.463 Moveable assets
Subjumlah 2.135.337 - - 366.363 2.501.700 Subtotal
Aset dalam pembangunan: Assets under construction:
Aset eksplorasi 169.286 118 - - 169.404 Exploration assets
Aset pengembangan 780.654 52.061 - (366.363) 466.352 Development assets
Subjumlah 949.940 52.179 - (366.363) 635.756 Subtotal
Jumlah harga perolehan 3.085.277 52.179 - - 3.137.456 Total acquisition costs
Akumulasi penyusutan: Accumulated depreciation:
Sumur panas bumi (430.239) (40.615) - - (470.854) Geothermal wells
Instalasi (410.100) (37.711) - - (447.811) Installations
Bangunan (81.303) (10.528) - - (91.831) Buildings
Harta benda bergerak (26.441) (1.374) - - (27.815) Moveable assets
Jumlah akumulasi Total accumulated
penyusutan (948.083) (90.228) - - (1.038.311) depreciation
Penyisihan penurunan nilai (112.587) - - - (112.587) Provision for impairment
Nilai buku bersih 2.024.607 1.986.558 Net book value
31 Desember/December 31, 2024
Saldo awal/ Saldo akhir/
Beginning Penambahan/ Pengurangan/ Reklasifikasi/ Ending
balance Additions Deduction Reclassification balance
Harga perolehan: Acquisition costs:
Tanah dan hak atas tanah 18.226 - - 994 19.220 Land and land rights
Sumur panas bumi 1.038.098 - - 73.940 1.112.038 Geothermal wells
Instalasi 756.041 - - 23.637 779.678 Installations
Bangunan 182.321 - - 9.727 192.048 Buildings
Harta benda bergerak 29.444 - - 2.909 32.353 Moveable assets
Subjumlah 2.024.130 - - 111.207 2.135.337 Subtotal
Aset dalam pembangunan: Assets under construction:
Aset eksplorasi 168.729 557 - - 169.286 Exploration assets
Aset pengembangan 697.006 194.855 - (111.207) 780.654 Development assets
Subjumlah 865.735 195.412 - (111.207) 949.940 Subtotal
Jumlah harga perolehan 2.889.865 195.412 - - 3.085.277 Total acquisition costs
Akumulasi penyusutan: Accumulated depreciation:
Sumur panas bumi (379.732) (50.507) - - (430.239) Geothermal wells
Instalasi (363.897) (46.203) - - (410.100) Installations
Bangunan (68.756) (12.547) - - (81.303) Buildings
Harta benda bergerak (23.884) (2.557) - - (26.441) Moveable assets
Jumlah akumulasi Total accumulated
penyusutan (836.269) (111.814) - - (948.083) depreciation
Penyisihan penurunan nilai (112.587) - - - (112.587) Provision for impairment
Nilai buku bersih 1.941.009 2.024.607 Net book value
Page 64
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/54 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
9. ASET TETAP (lanjutan) 9. FIXED ASSETS (continued)
Pada tanggal 30 September 2025 dan 31 Desember As of September 30, 2025, and December 31, 2024,
2024, seluruh aset tetap dikategorikan sebagai aset fixed assets are categorised as geothermal assets
panas bumi yang digunakan untuk menunjang used to support the Group's operational activities.
kegiatan operasional Grup.
Pada tanggal 30 September 2025 aset tetap dalam As of September 30, 2025 asset under construction,
pembangunan meliputi proyek eksplorasi panas consists of the Bukit Daun, Sungai Penuh,
bumi di wilayah kerja Bukit Daun, Sungai Penuh, Lahendong Unit 7&8 and Gunung Tiga exploration
Lahendong Unit 7&8, proyek eksplorasi Gunung Tiga projects and the following geothermal development
serta proyek-proyek pengembangan panas bumi projects:
sebagai berikut:
1. Lumut Balai Unit 3 dan 4; dan 1. Lumut Balai Units 3 and 4; and
2. Hululais Unit 1 dan 2. 2. Hululais Units 1 and 2.
Sampai dengan tanggal 30 September 2025, proyek As of September 30, 2025, the Lumut Balai 2 project
Lumut Balai 2 sudah dapat beroperasi secara penuh have been fully operated with the issuance of the
dengan telah diterbitkannya Surat Layak Operasi Operational Eligibility Letter (SLO) on June 29, 2025
(SLO) pada tanggal 29 Juni 2025 dengan kapasitas with a capacity of 55 MW.
55 MW.
Sampai dengan tanggal 30 September 2025, status As of September 30, 2025, the Hululais Unit 1&2
proyek Hululais Unit 1&2 sebesar 87,86% dengan development project is 87.86%. The estimated
estimasi tanggal operasi komersial proyek pada commercial operation dates is 2027. The asset under
tahun 2027. Aset tetap dalam pembangunan proyek construction of the Lumut Balai Units 3 and 4 projects
pengembangan Lumut Balai 3 dan 4 diintensikan is intended to support the Lumut Balai Unit 2
untuk digunakan dalam menunjang operasional operation.
Lumut Balai Unit 2.
Proyek Bukit Daun, Sungai Penuh dan Lahendong Bukit Daun, Sungai Penuh and Lahendong Unit 7&8
Unit 7&8 merupakan proyek dalam tahap eksplorasi. projects are exploration projects. Estimated
Estimasi penyelesaian akan dievaluasi kembali completion will be promptly reevaluated based on the
secara berkala sesuai dengan kondisi aktualnya. actual conditions. Asset under construction status as
Status aset tetap dalam pembangunan pada tanggal of September 30, 2025, for Bukit Daun and Sungai
30 September 2025 untuk proyek eksplorasi Bukit Penuh exploration projects are in the process of
Daun dan Sungai Penuh adalah dalam proses kajian development study, meanwhile Lahendong Unit 7&8
pengembangan, sementara proyek eksplorasi exploration project is on reservoir simulation
Lahendong Unit 7 dan 8 berada pada tahap completion phase, with estimation of the commercial
penyelesaian simulasi reservoar, dengan estimasi operation dates in the years 2028, 2027 and 2028,
tanggal operasi komersial proyek masing-masing respectively,
pada 2028, 2027 and 2028.
Bunga yang dikapitalisasi sebagai bagian dari aset Interest capitalised as part of fixed assets amounted
tetap masing-masing sebesar US$1.874 dan to US$1,874 and US$3,495 as of September 30,
US$3.495, pada 30 September 2025 dan 31 2025, and December 31, 2024, respectively.
Desember 2024. Biaya pinjaman dikapitalisasi pada Borrowing costs were capitalised at the weighted
tingkat bunga rata-rata tertimbang dari pinjaman average rate of its borrowings of 1.81% and 3.41%
masing-masing sebesar 1,81% dan 3,41% pada 30 on September 30, 2025, and December 31, 2024,
respectively.
September 2025 dan 31 Desember 2024.
Sampai dengan 30 September 2025, Grup As of September 30, 2025, Group suspended the
menghentikan sementara kapitalisasi bunga capitalisation of interest for the Hululais Units 1 and
pinjaman pada proyek Hululais Unit 1&2 sehubungan 2 project temporarily, due to the completion of the
dengan telah selesainya tahapan pengeboran sumur well drilling phase to ensure the availability of steam
untuk memastikan ketersediaan uap sesuai kontrak. following the contract. The Group will resume the
Grup akan kembali melakukan kapitalisasi bunga capitalisation of interest during the next substantive
pinjaman pada saat kegiatan substantif tahap phase, namely, the construction of the fluid collection
selanjutnya, yaitu pembangunan sarana produksi and reinjection system begins.
uap panas bumi dimulai.
Page 65
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/55 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
9. ASET TETAP (lanjutan) 9. FIXED ASSETS (continued)
Nilai wajar dari aset tanah di wilayah Kamojang, The fair value of the land at Kamojang, Lahendong,
Lahendong, Ulubelu, Sibayak, Karaha, dan Lumut Ulubelu, Sibayak, Karaha, and Lumut Balai, with total
Balai, dengan total area masing-masing 115.016 m2, areas of 115,016 sqm, 1,178,875 sqm, 1,065,842
1.178.875 m2, 1.065.842 m2, 194.774 m2, 2.450 m2 sqm, 194,774 sqm, 2,450 sqm, and 1,864,010 sqm,
and 1.864.010 m2 dengan total nilai wajar sebesar respectively, and a total fair value of US$32,687, was
US$32.687, didasarkan pada laporan valuasi KJPP based on the valuation report of KJPP Amin Nirwan
Amin Nirwan Alfiantori & Rekan, penilai independen, Alfiantori & Rekan, an independent appraisal, dated
tertanggal 11 Februari 2022. Keseluruhan aset tanah February 11, 2022. All land assets are used for the
digunakan untuk wilayah kerja. working area.
Grup memiliki beberapa bidang tanah dengan status The Group owned several lands with Building Right
Sertifikat Hak Guna Bangunan (“HGB”) atas nama Titles (“HGB”) status, which are registered under the
Perusahaan dengan nilai buku masing-masing Company’s name and have a book value of
sejumlah US$5.342 dan US$5.342 pada 30 US$5,342 and US$5,342 as of September 30, 2025,
September 2025 dan 31 Desember 2024. HGB and December 31, 2024, respectively. The HGB
tersebut berakhir pada tahun 2022 - 2051. expires in 2022 - 2051. The Group’s management
Manajemen Grup berpendapat bahwa hak atas believes that the term of the land rights can be
tanah dapat diperpanjang pada saat jatuh tempo. extended upon expiration.
Pada tanggal laporan keuangan ini, manajemen At the date of these consolidated financial
sedang dalam proses mengalihkan US$793 hak atas statements, management is in the process of
tanah Pertamina menjadi atas nama Grup sekaligus converting US$793 of Pertamina’s land rights into the
memperpanjang hak atas tanah menjadi 30 tahun Group’s name and simultaneously extending the
sesuai dengan Peraturan Pemerintah Nomor 18 term of the land rights to 30 years by Government
Tahun 2021. Regulation 18 of 2021.
Pada tanggal 30 September 2025 dan 31 Desember As of September 30, 2025, and December 31, 2024,
2024 terdapat aset tetap yang tidak dipakai fixed assets were temporarily not in use (Note 13).
sementara (Catatan 13).
Grup memiliki aset tetap yang telah disusutkan The Group has fully depreciated fixed assets that are
penuh dan masih digunakan masing-masing sebesar still used, amounting to US$103,957 and
US$103.957 dan US$102.507 pada 30 September US$102,507 as of September 30, 2025, and
2025 dan 31 Desember 2024. December 31, 2024, respectively.
Kebijakan asuransi atas aset tetap terpusat di Insurance for fixed assets is arranged under
Pertamina. Pada tanggal 30 September 2025, aset Pertamina’s insurance policies. As of September 30,
tetap telah diasuransikan terhadap risiko kebakaran, 2025, fixed assets are insured against fire, theft, and
pencurian, dan risiko lain yang mungkin terjadi other risks with PT Tugu Pratama Indonesia, with
kepada PT Tugu Pratama Indonesia dengan nilai coverage of US$841,899 and US$841,335 as of
pertanggungan masing-masing sebesar September 30, 2025, and December 31, 2024,
US$841.899 dan US$841.335 pada 30 September respectively.
2025 dan 31 Desember 2024.
Berdasarkan pengujian penurunan nilai, tidak Based on the impairment assessment, there was no
terdapat penurunan nilai pada tanggal 30 September impairment as of September 30, 2025, and
2025 dan 31 Desember 2024. December 31, 2024.
Pada tanggal 30 September 2025 dan 31 Desember As of September 30, 2025, and December 31,
2024, tidak terdapat aset tetap yang digunakan 2024, no fixed assets were used as collateral.
sebagai jaminan.
Page 66
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/56 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
10. SEWA 10. LEASE
Mutasi aset hak guna adalah sebagai berikut: The movements in right of use assets are as follows:
30 September (Tidak Diaudit)/September 30 (Unaudited), 2025
Saldo awal/ Saldo akhir/
Beginning Penambahan/ Pengurangan/ Ending
Balance Additions Deductions balance
Biaya perolehan Cost
Kendaraan 2.317 666 (200) 2.783 Vehicles
Gedung 3.204 - (319) 2.885 Building
Subjumlah 5.521 666 (519) 5.668 Subtotal
Akumulasi penyusutan Accumulated depreciation
Kendaraan (1.226) (543) 200 (1.569) Vehicles
Gedung (80) (721) 319 (482) Building
Subjumlah (1.306) (1.264) 519 (2.051) Subtotal
Nilai buku bersih 4.215 3.617 Net book value
31 Desember/December 31, 2024
Saldo awal/ Saldo akhir/
Beginning Penambahan/ Pengurangan/ Ending
Balance Additions Deductions balance
Biaya perolehan Cost
Kendaraan 1.577 789 (49) 2.317 Vehicles
Gedung 4.600 3.204 (4.600) 3.204 Building
Subjumlah 6.177 3.993 (4.649) 5.521 Subtotal
Akumulasi penyusutan Accumulated depreciation
Kendaraan (402) (873) 49 (1.226) Vehicles
Gedung (3.848) (832) 4.600 (80) Building
Subjumlah (4.250) (1.705) 4.649 (1.306) Subtotal
Nilai buku bersih 1.927 4.215 Net book value
Liabilitas sewa terdiri dari: Lease liabilities consist of:
30 September
(Tidak Diaudit)/
September 30 31 Desember/
(Unaudited), December 31,
2025 2024
Bagian jatuh tempo 1.645 1.402 Current maturities
Bagian setelah dikurangi jatuh tempo 1.508 2.549 Net-off current maturities
Jumlah 3.153 3.951 Total
Jumlah yang diakui dalam laporan laba rugi dan Amounts recognized in the consolidated statement of
penghasilan komprehensif lain konsolidasian: profit or loss and other comprehensive income:
30 September 30 September
(Tidak Diaudit)/ (Tidak Diaudit)/
September 30 September 30
(Unaudited), (Unaudited),
2025 2024
Beban terkait liabilitas sewa
dengan nilai rendah atau Expense related to low value
jangka pendek (Catatan 21 dan 22) 2.427 2.186 short-term leases (Notes 21 and 22)
Beban penyusutan aset hak guna 1.264 1.241 Depreciation on right of use asset
Bunga atas liabilitas sewa Interest on lease liabilities
(Catatan 23) 167 56 (Note 23)
Jumlah 3.858 3.483 Total
Page 67
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/57 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
10. SEWA (lanjutan) 10. LEASE (continued)
Laporan arus kas konsolidasian menyajikan nilai The consolidated statements of cash flows show the
pembayaran berikut berkaitan dengan sewa: following payments amounts related to leases:
30 September
(Tidak Diaudit)/
September 30 31 Desember/
(Unaudited), December 31,
2025 2024
Saldo awal 3.951 2.023 Beginning balance
Penambahan 381 3.873 Additions
Beban bunga 167 98 Interest expense
Pembayaran (1.222) (1.922) Payments
Selisih kurs (124) (121) Foreign exchange
Saldo akhir 3.153 3.951 Ending balance
11. INVESTASI PADA VENTURA BERSAMA 11. INVESTMENT IN JOINT VENTURE
Pada tanggal 30 September 2025, Grup memiliki As of September 30, 2025, the Group has joint
ventura bersama sebagai berikut: ventures as follows:
Persentase Metode
Tempat kepemilikan/ pengukuran/
Nama entitas/ kedudukan/ Percentage Measurement
Name of entity domicile of ownership Sifat hubungan / Nature of relationship method
PT Cahaya Jakarta 40% PT CAE bergerak di bidang pengusahaan tenaga panas bumi/ Ekuitas/
Anagata Energy PT CAE operates in the field of geothermal energy business Equity
Berikut ini merupakan ringkasan informasi keuangan Set out below is the summarised financial information
dari ventura bersama yang dicatat dengan of the joint ventures PT Cahaya Anagata Energy
menggunakan metode ekuitas. which are accounted for using the equity method.
PT Cahaya Anagata Energy PT Cahaya Anagata Energy
30 September
(Tidak Diaudit)/
September 30 31 Desember/
(Unaudited), December 31,
2025 2024
Ringkasan laporan Summarised statement
posisi keuangan of financial position
Kas dan setara kas 929 462 Cash and cash equivalents
Aset lancar lainnya 2.011 6 Other current assets
Aset tidak lancar lainnya 27.721 29.908 Other non-current assets
Liabilitas keuangan jangka pendek (485) (140) Short-term financial liabilities
Liabilitas jangka pendek lainnya (1) (4) Other short-term liabilities
Aset bersih 30.175 30.232 Net asset
Page 68
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/58 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
11. INVESTASI PADA VENTURA BERSAMA (lanjutan) 11. INVESTMENT IN JOINT VENTURE (continued)
PT Cahaya Anagata Energy (lanjutan) PT Cahaya Anagata Energy (continued)
30 September 30 September
(Tidak Diaudit)/ (Tidak Diaudit)/
September 30 September 30
(Unaudited), (Unaudited),
2025 2024
Ringkasan laporan Summarised statement
penghasilan komprehensif of comprehensive income
Pendapatan - - Revenue
Beban pokok pendapatan (770) (69) Cost of revenue
Beban administrasi umum (1) - General administrative expenses
Beban lain-lain (28) (9) Other expenses
Pendapatan keuangan 739 1.053 Finance income
Rugi selisih kurs 3 1 Foreign exchange loss
(Rugi)/laba sebelum pajak penghasilan (57) 976 (Loss)/profit before income tax
Beban pajak penghasilan - - Income tax expense
Laba tahun berjalan (57) 976 Profit for the year
Rekonsiliasi dari ringkasan informasi keuangan yang Reconciliation of the summarised financial
disajikan terhadap nilai buku dari kepentingan Grup information presented to the carrying amount of the
dalam ventura bersama adalah sebagai berikut: Group’s interest in the joint venture is as follows:
30 September
(Tidak Diaudit)/
September 30 31 Desember/
(Unaudited), December 31,
2025 2024
Ringkasan informasi keuangan Summarised financial information
Pada awal tahun 30.232 29.100 At the beginning of the year
Penambahan - - Addition
(Rugi)/laba tahun berjalan (57) 1.132 (Loss)/profit for the period
Pada akhir tahun 30.175 30.232 At the end of the year
Kepemilikan ventura bersama @40% 12.070 12.093 Interest in joint venture @40%
Nilai buku 12.070 12.093 Carrying value
30 September
(Tidak Diaudit)/
September 30 31 Desember/
(Unaudited), December 31,
2025 2024
Pada awal tahun 12.093 11.640 At the beginning of the year
Penambahan - - Addition
Bagian laba diserap tahun berjalan (23) 453 Share profit for the year
Nilai buku 12.070 12.093 Carrying value
Page 69
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/59 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
12. ASET KEUANGAN LAINNYA 12. OTHER FINANCIAL ASSETS
Rincian aset keuangan lain yang dimiliki oleh Grup Details of other financial assets owned by the Group
adalah sebagai berikut: are as follows:
30 September
(Tidak Diaudit)/
September 30 31 Desember/
(Unaudited), December 31,
2025 2024
Aset keuangan yang dinilai Financial asset at
pada nilai wajar melalui fair value through other
pendapatan komprehensif lain 21.716 21.716 comprehensive income
Jumlah 21.716 21.716 Total
Aset keuangan yang dinilai pada nilai wajar melalui Financial asset at fair value through other
pendapatan komprehensif lain. comprehensive income.
Aset keuangan yang dinilai pada nilai wajar melalui Financial assets at fair value through other
pendapatan komprehensif lain merupakan investasi comprehensive income are an equity instrument
instrumen ekuitas pada Grup Pertamina. Berikut investment in the Pertamina Group. Following is the
merupakan perubahan saldo nilai wajar investasi change in fair value of investment during the year:
pada tahun berjalan:
30 September
(Tidak Diaudit)/
September 30 31 Desember/
(Unaudited), December 31,
2025 2024
Saldo awal 21.716 29.004 Beginning balance
Perubahan nilai wajar tahun Change in fair value for the
berjalan - (7.288) year
Jumlah 21.716 21.716 Total
13. ASET LAIN-LAIN, BERSIH 13. OTHER ASSETS, NET
a. Aset lancar lainnya a. Other current assets
30 September
(Tidak Diaudit)/
30 September 31 Desember/
(Unaudited), December 31,
2025 2024
Biaya yang ditangguhkan 188 188 Deferred expenses
Uang muka pihak berelasi 85 1.429 Advances to related parties
Uang muka pihak ketiga - 3.463 Advances to third parties
Jumlah 273 5.080 Total
Uang muka pihak berelasi merupakan uang Advances to related parties represent advances to
muka kepada PT Wijaya Karya dan uang muka PT Wijaya Karya, and advances to third parties
pihak ketiga merupakan uang muka kepada represent advances to Mitsubishi Corporation and
Mitsubishi Corporation dan SEPCOIII Electric SEPCOIII Electric Power Construction Co., Ltd. as
Power Construction Co., Ltd. sebagai bagian part of the contract implementing consortium for
konsorsium pelaksana kontrak EPCC Lumut EPCC Lumut Balai Unit 2.
Balai Unit 2.
Biaya yang ditangguhkan merupakan biaya Deferred expenses are expenditures related to
terkait jaminan pendaftaran lelang wilayah kerja guarantees for registering ongoing geothermal work
panas bumi yang sedang berlangsung. area auctions.
Page 70
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/60 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
13. ASET LAIN-LAIN, BERSIH (lanjutan) 13. OTHER ASSETS, NET (continued)
b. Aset tidak lancar lainnya b. Other non-current assets
30 September
(Tidak Diaudit)/
September 30 31 Desember/
(Unaudited), December 31,
2025 2024
Persediaan usang dan Obsolete and unusable
tidak terpakai 299 299 inventories
Aset tetap tidak terpakai, bersih 42 42 Unused fixed assets, net
Subjumlah 341 341 Subtotal
Penyisihan persediaan Allowance for obsolete and
usang dan tidak terpakai (299) (299) unusable inventories
Jumlah 42 42 Total
14. UTANG USAHA 14. TRADE PAYABLES
30 September
(Tidak Diaudit)/
September 30 31 Desember/
(Unaudited), December 31,
2025 2024
Rupiah Rupiah
Pihak yang berelasi (Catatan 26h) 827 2.216 Related parties (Note 26h)
Pihak ketiga 1.791 9.621 Third parties
Subjumlah 2.618 11.837 Subtotal
Dolar Amerika Serikat United States dollar
Pihak yang berelasi (Catatan 26h) 45 18 Related parties (Note 26h)
Pihak ketiga 67.561 78.756 Third parties
Subjumlah 67.606 78.774 Subtotal
Euro Eropa European euro
Pihak ketiga 57 201 Third parties
Subjumlah 57 201 Subtotal
Yen Jepang Japanese yen
Pihak ketiga 1 5.983 Third parties
Subjumlah 1 5.983 Subtotal
Jumlah 70.282 96.795 Total
Mayoritas utang usaha kepada pihak ketiga dalam The majority of trade payables to third parties in
mata uang dolar AS terdiri atas utang kepada Star currency US dollar involve payables to Star Energy
Energy Geothermal Darajat II Ltd., Star Energy Salak Geothermal Darajat II Ltd., Star Energy Geothermal
Pratama Ltd., dan Star Energy Geothermal Salak Salak Pratama Ltd., and Star Energy Geothermal
Ltd., yang timbul dari transaksi pass-through antara Salak Ltd., as a result of pass-through transactions
Grup dan Kontraktor KOB tersebut (Catatan 3m). between the Group and those JOC contractors
Pada tanggal 30 September 2025 dan 31 Desember (Note 3m). As of September 30, 2025, and December
2024, jumlah yang belum dibayarkan atas utang 31, 2024, the outstanding pass-through transaction
transaksi pass-through tersebut adalah masing- payables were US$67,196 and US$67,093,
masing sebesar US$67.196 dan US$67.093 respectively (Notes 6a).
(Catatan 6a).
Page 71
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/61 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
15. BIAYA YANG MASIH HARUS DIBAYAR 15. ACCRUED EXPENSES
30 September
(Tidak Diaudit)/
September 30 31 Desember/
(Unaudited), December 31,
2025 2024
Kontrak barang dan jasa Material and service contracts
- Pihak yang berelasi (Catatan 26k) 4.678 5.157 Related parties (Note 26k) -
- Pihak ketiga 30.809 71.054 Third parties -
Lain-lain 19.639 11.842 Others
Jumlah 55.126 88.053 Total
16. UTANG OBLIGASI 16. BONDS PAYABLE
Pada tanggal 27 April 2023, Perusahaan On April 27, 2023, the Company issued green bonds
menerbitkan surat utang berwawasan lingkungan with a nominal value of US$400,000,000 (full
dengan nilai nominal sebesar US$400.000.000 (nilai amount) as follows:
penuh) sebagai berikut:
Nilai nominal penuh/ Tingkat bunga tetap per tahun/ Jatuh tempo/
Obligasi/Bonds Nominal full amount Interest rate per annum Due date
Senior Unsecured Fixed Rate Notes US$400.000.000 5,15% 27 April 2028
Pada tanggal 30 September 2025, Grup mencatat On September 30, 2025, the Group recorded the
nilai obligasi sebagai berikut: bond carrying amount as follows:
30 September
(Tidak Diaudit)/
September 30 31 Desember/
(Unaudited), December 31,
2025 2024
Nilai nominal 400.000 400.000 Nominal value
Dikurangi: Less:
Diskonto dan beban transaksi Discounts and deferred
yang ditangguhkan dikurangi transaction costs - net of
akumulasi amortisasi (1.052) (1.357) accumulated amortization
Nilai tercatat obligasi 398.948 398.643 Bonds carrying value
Surat utang berwawasan lingkungan tersebut The green bonds were listed on the Singapore
terdaftar di Singapore Exchange Securities Trading Exchange Securities Trading and offered at 100% of
dan ditawarkan dengan nilai 100% dari jumlah pokok the principal amount. Bonds' interest is paid
obligasi. Bunga obligasi dibayarkan setiap semester, semiannually, with the first interest payment made on
dengan pembayaran bunga pertama dilakukan pada October 27, 2023, and the last interest payment and
tanggal 27 Oktober 2023, sedangkan pembayaran maturity on April 27, 2028, which is also the principal
bunga terakhir sekaligus jatuh tempo obligasi adalah repayment date of the bonds.
pada tanggal 27 April 2028 yang juga merupakan
tanggal pelunasan pokok dari obligasi.
Hasil penerbitan surat utang tersebut digunakan The proceeds from the issuance of the bonds were
untuk melunasi sepenuhnya fasilitas Bridge Loan. used to repay the Bridge Loan facility fully.
Page 72
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/62 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
17. PENYISIHAN IMBALAN KERJA KARYAWAN 17. PROVISION FOR EMPLOYEE BENEFITS
Alokasi Kewajiban dari Pertamina untuk Liability Allocation from Pertamina for Secondee
Karyawan Secondee Pertamina: Employees of Pertamina:
Sesuai dengan kebijakan Pertamina, setiap anak Based on Pertamina's policy, every subsidiary
perusahaan (termasuk Perusahaan) harus mengakui (including the Company) should recognise several
sejumlah alokasi kewajiban terkait imbalan-imbalan liability allocations concerning the benefits provided
yang diberikan oleh Pertamina kepada karyawan by Pertamina to the Secondee Pertamina employees
Secondee Pertamina yang diperbantukan di anak who are seconded at the subsidiary's companies.
perusahaan.
Hal ini merupakan pengaturan pembagian kewajiban This a liability sharing arrangement between
antara Pertamina dan anak perusahaan terkait Pertamina and the subsidiaries companies
periode (atau masa kerja) perbantuan karyawan di concerning the seconded period (or services) of the
anak perusahaan: employees at the subsidiaries:
- Dana Pensiun Pertamina (“DPP”). - Dana Pensiun Pertamina (“the DPP”).
- Penghargaan Atas Pengabdian (“PAP”). - Penghargaan Atas Pengabdian (“the PAP”).
- Kesehatan Pasca Pensiun (“Pensioner - Post-retirement Healthcare (“the Pensioner
Healthcare”). Healthcare).
- Biaya Pemulangan (“Repatriasi”). - Biaya Pemulangan (“the Repatriasi”).
- Masa Persiapan Purna Karya (“MPPK”). - Masa Persiapan Purna Karya (“the MPPK”).
- Ulang Tahun Dinas (“UTD”). - Ulang Tahun Dinas (“the UTD”).
Imbalan kerja karyawan yang dimiliki oleh Grup terdiri The Group’s employee benefits consist of short-term
dari imbalan kerja jangka pendek dan imbalan kerja and long-term employee benefits.
jangka panjang.
a. Imbalan kerja jangka pendek a. Short-term employee benefits
Imbalan kerja jangka pendek Grup terdiri dari Short-term employee benefits of the Group
gaji, iuran dana pensiun, jaminan sosial tenaga consist of salaries, contributions for pension
kerja dan imbalan kerja karyawan lainnya. funds, employee social security and other
Imbalan kerja berupa insentif karyawan disajikan employee benefits. Employee benefits in the
sebagai berikut: form of employee incentives are presented as
follows:
30 September
(Tidak Diaudit)/
September 30 31 Desember/
(Unaudited), December 31,
2025 2024
Insentif karyawan 13.789 9.694 Employee incentives
Jumlah 13.789 9.694 Total
b. Imbalan kerja jangka panjang b. Long-term employee benefits
Imbalan kerja jangka panjang Grup diberikan The Group's long-term employee benefits are
kepada karyawan direct hire dan secondee provided to direct-hire employees and
Pertamina. Karyawan direct hire merupakan secondee of Pertamina. Direct-hire employees
seluruh karyawan permanen yang direkrut are all permanent employees who the Company
secara langsung oleh Perusahaan. Karyawan directly hires. Secondee employees of
secondee Pertamina terdiri dari karyawan Pertamina are permanent employees who are
permanen yang ditempatkan/diperbantukan di placed/seconded at the Company by
Perusahaan oleh Pertamina. Pertamina.
Page 73
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/63 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
17. PENYISIHAN IMBALAN KERJA KARYAWAN 17. PROVISION FOR EMPLOYEE BENEFITS
(lanjutan) (continued)
b. Imbalan kerja jangka panjang (lanjutan) b. Long-term employee benefits (continued)
Liabilitas imbalan kerja jangka panjang yang Long-term employee benefits liability
diakui dalam laporan posisi keuangan recognised in the consolidated statement of
konsolidasian adalah sebagai berikut: financial position is as follows:
30 September
(Tidak Diaudit)/
September 30 31 Desember/
(Unaudited), December 31,
2025 2024
Penyisihan imbalan Provision for
kerja karyawan employee benefits
Imbalan pasca kerja Post employment benefits
- Karyawan direct hire 3.014 4.343 Direct hire employee -
- Karyawan secondee 4.775 4.109 Secondee employee -
Imbalan kerja jangka- Other long-term
panjang lainnya employee benefits
- Karyawan direct hire 565 567 Direct hire employee -
Saldo akhir 8.354 9.019 Ending balance
Imbalan pascakerja merupakan imbalan yang Post-employment benefits represent benefits
diberikan langsung oleh Grup kepada para provided directly by the Group to the employees,
karyawan, yang mencakup DPP, PAP, including the DPP, the PAP, the Pensioners
Pensioners Healthcare, Repatriasi, MPPK, dan Healthcare, the Repatriation, the MPPK, and the
UTD. UTD.
Perusahaan mencatat karyawan pada tanggal The Company recorded the liability for employee
30 September 2025 dan 31 Desember 2024 benefits as of September 30, 2025, and
berdasarkan perhitungan yang dilakukan oleh December 31, 2024, based on calculations
Steven & Mouritz, aktuaris independen, dalam performed by Steven & Mouritz, an independent
laporannya No. 0963/ST-DA-PSAK24- actuary, in its reports, respectively, No. 0963/ST-
PGE/III/2025, tanggal 3 Maret 2025, dengan DA-PSAK24-PGE/III/2025, dated March 3,
menggunakan metode projected unit credit. 2025, using the projected unit credit method.
Asumsi-asumsi penting yang digunakan oleh The significant assumptions used by the actuary
aktuaris dalam laporannya adalah sebagai in its reports are as follows:
berikut:
Tingkat diskonto : 7,10% pada tahun 2024/in 2024 : Discount rate
Tingkat kenaikan gaji : 7,34% pada tahun 2024/in 2024 : Salary increase rate
Tingkat inflasi emas : 8,0% pada tahun 2024/in 2024 : Gold inflation rate
Harga emas (Rp/gr) : 1.457.480 pada tahun 2024/in 2024 : Gold price (Rp/gr)
Tingkat kematian : Tabel Mortalita Indonesia IV (2019) : Mortality rate
pada tahun 2024/in 2024
Usia pensiun : 56 tahun/56 years old : Retirement age
Tingkat pengunduran diri : 1% untuk karyawan yang berusia di bawah : Resignation rate
25 tahun dan akan menurun sampai 0%
pada usia 56 tahun/ 1% for employees
younger than 20 years-old which will
decrease to 0% at the age of 56 years old
Tingkat kecacatan : 0,75% x TMI IV pada tahun 2024/in 2024 : Disability rate
Tingkat pensiun : 100% di usia 56/100% at age of 56 : Retirement rate
Page 74
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/64 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
17. PENYISIHAN IMBALAN KERJA KARYAWAN 17. PROVISION FOR EMPLOYEE BENEFITS
(lanjutan) (continued)
b. Imbalan kerja jangka panjang (lanjutan) b. Long-term employee benefits (continued)
Tidak ada perbedaan asumsi yang digunakan There is no difference in the assumptions used
antara imbalan kerja untuk karyawan direct hire for employee benefits for direct hire and
dan secondee Pertamina. secondee Pertamina employees.
1. Imbalan pasca kerja 1. Post-employment benefits
Jumlah yang diakui dalam laporan posisi Amounts recognised in the consolidated
keuangan konsolidasian adalah sebagai statements of financial position are as
berikut: follows:
30 September
(Tidak Diaudit)/
September 30 31 Desember/
(Unaudited), December 31,
2025 2024
Nilai kini kewajiban 18.917 17.937 Present value of obligation
Nilai wajar aset program (11.128) (9.485) Fair value of plan assets
Jumlah 7.789 8.452 Total
Mutasi nilai kini kewajiban adalah sebagai The movements in present value of
berikut: obligation are as follows:
30 September
(Tidak Diaudit)/
September 30 31 Desember/
(Unaudited), December 31,
2025 2024
Saldo awal 17.937 18.358 Beginning balance
Diakui pada laba rugi 931 2.866 Recognized in profit or loss
Diakui pada laba Recognized in other
komprehensif lain - (2.471) comprehensive income
Pembayaran imbalan
kerja - - Benefit payments
Dampak perubahan kurs
mata uang asing 49 (816) Foreign exchange differential
Saldo akhir 18.917 17.937 Ending balance
Mutasi nilai wajar aset program adalah The movements in fair value of plan assets
sebagai berikut: are as follows:
30 September
(Tidak Diaudit)/
September 30 31 Desember/
(Unaudited), December 31,
2025 2024
Saldo awal 9.485 5.288 Beginning balance
Iuran perusahaan 1.947 4.023 Company contribution
Pendapatan bunga - 409 Interest income
Imbal hasil - 1 Return on plan assets
Dampak perubahan kurs
mata uang asing (304) (236) Foreign exchange differential
Saldo akhir 11.128 9.485 Ending balance
Page 75
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/65 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
17. PENYISIHAN IMBALAN KERJA KARYAWAN 17. PROVISION FOR EMPLOYEE BENEFITS
(lanjutan) (continued)
b. Imbalan kerja jangka panjang (lanjutan) b. Long-term employee benefits (continued)
1. Imbalan pascakerja (lanjutan) 1. Post-employment benefits (continued)
Rincian aset program adalah sebagai The details of plan assets are as follows:
berikut:
30 September (Tidak Diaudit)/ 31 Desember/
September 30 (Unaudited), 2025 December 31, 2024
Nilai wajar/ Nilai wajar/
Fair value % Fair value %
Kas dan setara kas 459 5 474 5 Cash and cash equivalent
Instrumen saham 2.754 30 2.846 30 Equity instruments
Instrumen utang 3.672 40 3.794 40 Debt instruments
Investment funds 2.295 25 2.371 25 Investment funds
Jumlah 9.180 100 9.485 100 Total
Jumlah yang diakui dalam beban pokok Amounts recognised in cost of revenues and
pendapatan dan beban umum dan general and administrative expenses are as
administrasi adalah sebagai berikut: follows:
30 September
(Tidak Diaudit)/
September 30 31 Desember/
(Unaudited), December 31,
2025 2024
Biaya jasa kini 931 1.273 Current service cost
Biaya jasa lalu atas kurtailmen - (57) Past service cost on curtailment
Biaya bunga - 911 Interest cost
Pendapatan bunga atas
aset program - (409) Interest income on plan assets
Penyesuaian liabilitas atas Liability released due to
karyawan transfer keluar - - employee transferred out
Alokasi pegawai
perbantuan 462 739 Secondee employee allocation
Jumlah 1.393 2.457 Total
Jumlah yang diakui dalam penghasilan Amounts recognised in other comprehensive
komprehensif lain adalah sebagai berikut: income are as follows:
30 September
(Tidak Diaudit)/
September 30 31 Desember/
(Unaudited), December 31,
2025 2024
Kerugian atas perubahan asumsi Loss from changes in
keuangan - 2.263 financial assumptions
(Keuntungan) atas (Gain) from
penyesuaian pengalaman - (318) experience adjustments
Imbal hasil atas aset
program - 1 Return on plan assets
Jumlah - 1.946 Total
Page 76
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/66 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
17. PENYISIHAN IMBALAN KERJA KARYAWAN 17. PROVISION FOR EMPLOYEE BENEFITS
(lanjutan) (continued)
b. Imbalan kerja jangka panjang (lanjutan) b. Long-term employee benefits (continued)
1. Imbalan pascakerja (lanjutan) 1. Post employment benefits (continued)
Mutasi liabilitas imbalan kerja adalah The movements in employee benefits liability
sebagai berikut: are as follows:
30 September
(Tidak Diaudit)/
September 30 31 Desember/
(Unaudited), December 31,
2025 2024
Saldo awal 8.452 13.070 Beginning balance
Pembayaran imbalan kerja (1.947) (4.549) Benefits paid
Biaya yang diakui pada Expense recognized
laba rugi 1.393 2.457 in profit or loss
Pendapatan yang diakui Income recognized
pada pendapatan in other comprehensive
komprehensif lain - (1.946) income
Dampak perubahan kurs
mata uang asing (109) (580) Foreign exchange differential
Saldo akhir 7.789 8.452 Ending balance
Analisa sensitivitas terhadap asumsi utama Sensitivity analysis of the key assumptions
yang digunakan dalam menentukan used in determining pension benefits
kewajiban imbalan pensiun adalah sebagai obligations is as follows:
berikut:
30 September (Tidak Diaudit)/ 31 Desember/
September 30 (Unaudited), 2025 December 31, 2024
Kenaikan/ Penurunan/ Kenaikan/ Penurunan/
Increase Decrease Increase Decrease
of 1% of 1% of 1% of 1%
Tingkat diskonto (11.292) 14.309 (12.375) 15.745 Discount rate
Kenaikan gaji 14.770 (11.186) 15.793 (12.372) Salary increase
Analisis jatuh tempo yang diharapkan dari The expected maturity analysis of undiscounted
manfaat pensiun tidak didiskontokan adalah pension benefits is as follows:
sebagai berikut:
30 September
(Tidak Diaudit)/
September 30 31 Desember/
(Unaudited), December 31,
2025 2024
Kurang dari 1 tahun 144 149 Less than 1 year
Antara 1 sampai 5 tahun 1.468 1.522 Between 2 and 5 years
Di atas 5 tahun 9.413 9.725 Beyond 5 years
Durasi rata-rata dari kewajiban imbalan kerja The average duration of the benefit obligation
pada tanggal 30 September 2025 dan 31 on September 30, 2025, and December 31,
Desember 2024 adalah 16 sampai 17 tahun. 2024, is 16 to 17 years.
Page 77
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/67 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
17. PENYISIHAN IMBALAN KERJA KARYAWAN 17. PROVISION FOR EMPLOYEE BENEFITS
(lanjutan) (continued)
b. Imbalan kerja jangka panjang (lanjutan) b. Long-term employee benefits (continued)
2. Imbalan kerja jangka panjang lainnya 2. Other long-term employee benefits
Imbalan kerja jangka panjang lainnya Other long-term employee benefits
merupakan penghargaan masa kerja yang represent the length of service awards
diberikan kepada para karyawan, yang terdiri provided to the employees, which consist of
atas Masa Persiapan Purna Karya (“MPPK”) Masa Persiapan Purna Karya (“MPPK”) and
dan Ulang Tahun Dinas (“UTD”). Ulang Tahun Dinas (“UTD”).
Jumlah yang diakui dalam laporan posisi Amounts recognised in the consolidated
keuangan konsolidasian adalah sebagai statement of financial position are as
berikut: follows:
30 September
(Tidak Diaudit)/
September 30 31 Desember/
(Unaudited), December 31,
2025 2024
Liabilitas imbalan
kerja jangka Other long-term
panjang lainnya 565 567 employee benefits
Mutasi nilai kini kewajiban adalah sebagai The movements in present value of
berikut: obligation are as follows:
30 September
(Tidak Diaudit)/
September 30 31 Desember/
(Unaudited), December 31,
2025 2024
Saldo awal 567 355 Beginning balance
Diakui pada laporan
laba rugi 16 229 Recognized in profit or loss
Dampak perubahan
kurs mata uang
asing (18) (17) Foreign exchange differential
Saldo akhir 565 567 Ending balance
Jumlah yang diakui dalam beban pokok Amounts recognized in cost of revenues and
pendapatan dan beban umum dan general and administrative expenses are as
administrasi adalah sebagai berikut: follows:
30 September
(Tidak Diaudit)/
September 30 31 Desember/
(Unaudited), December 31,
2025 2024
Biaya jasa kini 16 45 Current service cost
Biaya bunga - 23 Interest cost
Jumlah 16 68 Total
Page 78
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/68 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
17. PENYISIHAN IMBALAN KERJA KARYAWAN 17. PROVISION FOR EMPLOYEE BENEFITS
(lanjutan) (continued)
b. Imbalan kerja jangka panjang (lanjutan) b. Long-term employee benefits (continued)
2. Imbalan kerja jangka panjang lainnya 2. Other long-term employee benefits
(lanjutan) (continued)
Jumlah yang diakui dalam penghasilan Amounts recognized in other
komprehensif lain adalah sebagai berikut: comprehensive income are as follows:
30 September
(Tidak Diaudit)/
September 30 31 Desember/
(Unaudited), December 31,
2025 2024
Kerugian atas perubahan asumsi Loss from changes in
keuangan - 21 financial assumptions
Kerugian/(keuntungan)
atas penyesuaian Loss/(gain) from experience
pengalaman - 140 adjustments
Jumlah - 161 Total
Analisa sensitivitas terhadap asumsi utama Sensitivity analysis to the critical
uang digunakan dalam menentukan assumptions used in determining other
kewajiban imbalan kerja jangka Panjang long-term benefits obligations are as
lainnya adalah sebagai berikut: follows:
30 September (Tidak Diaudit)/ 31 Desember/
September 30 (Unaudited), 2025 December 31, 2024
Kenaikan/ Penurunan/ Kenaikan/ Penurunan/
Increase Decrease Increase Decrease
of 1% of 1% of 1% of 1%
Tingkat diskonto (488) 563 (529) 610 Discount rate
Kenaikan gaji 562 (504) 609 (529) Salary increase
Analisis jatuh tempo yang diharapkan dari Expected maturity analysis of undiscounted
manfaat pensiun tidak didiskontokan adalah pension benefits are as follows:
sebagai berikut:
30 September
(Tidak Diaudit)/
September 30 31 Desember/
(Unaudited), December 31,
2025 2024
Kurang dari 1 tahun - - Less than 1 year
Antara 1 sampai 5 tahun 284 293 Between 1 and 5 years
Di atas 5 tahun 765 790 Beyond 5 years
Durasi rata-rata dari kewajiban imbalan kerja The average duration of the other long-term
jangka panjang lainnya pada tanggal employee benefit obligation on September
30 September 2025 dan 31 Desember 2024, 30, 2025, and December 31, 2024, is 15
masing-masing adalah 15 tahun dan 11 years and 11 years, respectively.
tahun.
c. Kewajiban jangka panjang lainnya c. Other long-term liabilities
Kewajiban jangka panjang lainnya merupakan Other long-term liabilities include a defined
program kesehatan pensiun dengan skema contribution pension health program that the
iuran pasti yang telah ditentukan oleh Company determined as of December 31, 2024,
Perusahaan sampai dengan 31 Desember 2024 with additional provision of US$1,206 after
dengan provisi tambahan senilai US$1.206, funding. As of September 30, 2025, the
setelah dilakukan pendanaan. Sampai dengan Company has added the provision value of
30 September 2025, Perusahaan telah US$1,725.
menambahkan nilai provisi menjadi US$1.725.
Page 79
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/69 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
17. PENYISIHAN IMBALAN KERJA KARYAWAN 17. PROVISION FOR EMPLOYEE BENEFITS
(lanjutan) (continued)
c. Kewajiban jangka panjang lainnya (lanjutan) c. Other long-term liabilities (continued)
Perusahaan melakukan perhitungan nilai The Company calculates the value of the
kewajiban dengan mempertimbangkan asumsi obligation by considering the assumption of a
tingkat kenaikan gaji sebesar 6,34% per tahun salary increase rate of 6.34% per year and an
dan hasil investasi (tingkat diskonto) sebesar investment return (discount rate) of 5% per year,
5% per tahun, sesuai dengan asumsi manfaat following the assumption of benefits of Pertamina
sebesar kapitasi Pertamina. capitation.
18. EKUITAS YANG DAPAT DIATRIBUSIKAN 18. EQUITY ATTRIBUTABLE TO OWNERS OF THE
KEPADA PEMILIK ENTITAS INDUK PARENT
a. Modal saham a. Share capital
Pada tanggal 16 Februari 2023, Perusahaan On February 16, 2023, the Company obtained
mendapatkan Surat Pemberitahuan Efektif a Notification Letter regarding the Effective
Pernyataan Pendaftaran No. S-43/D.04/2023 Statement of Registration No. S-43/D.04/2023
atas Penawaran Umum Perdana Saham dari arising from Initial Public Offering of Share from
OJK. Perusahaan efektif mencatatkan OJK. The Company registered its initial public
penawaran umum perdana saham pada Bursa offering in the Indonesia Stock Exchange
Efek Indonesia per tanggal 24 Februari 2023, effectively on February 24, 2023, with the
dengan jumlah saham yang dilepas ke publik number of shares released to the public of
sebanyak 10.350.000.000 lembar. 10,350,000,000 shares.
Pada tanggal 21 Februari 2024 dan 16 Agustus On February 21, 2024, and on August 16, 2024,
2024, Perusahaan menyampaikan laporan the Company submitted disclosure of
keterbukaan informasi sehubungan dengan information reports regarding implementing the
pelaksanaan MESOP Tahap I yang MESOP Phase I, which was carried out for 30
dilaksanakan selama 30 hari bursa terhitung trading days from February 24 (window
sejak tanggal 24 Februari 2024 (periode exercise 1), and MESOP Phase II for 30 trading
pelaksanaan ke 1) dan MESOP Tahap II yang days from August 24, 2024 (window exercise 2).
dilaksanakan selama 30 hari bursa terhitung
sejak tanggal 24 Agustus 2024 (periode
pelaksanaan ke 2).
Pada tanggal 21 Februari 2025, Perusahaan On February 21, 2024, the Company submitted
menyampaikan laporan keterbukaan informasi a disclosure of information report regarding
sehubungan dengan pelaksanaan Program implementing the MESOP Phase III, carried out
MESOP Tahap III yang dilaksanakan selama 30 for 30 trading days from August 24, 2025
hari bursa terhitung sejak tanggal 24 Agustus (window exercise 3).
2025 (periode pelaksanaan ke 3).
Pada tanggal 30 September 2025, susunan As of September 30, 2025, the Company’s
pemegang saham Perusahaan adalah sebagai shareholders are as follows:
berikut:
Persentase
kepemilikan/
Percentage of Nilai Rp /
Lembar/Shares ownership IDR Value Nilai/Value
PT Pertamina Power Indonesia 28.568.460.000 68,33 14.284.230.000.000 1.014.841 PT Pertamina Power Indonesia
Masdar Indonesia Solar Holdings Masdar Indonesia Solar Holdings
RSC Limited 6.209.421.300 14,85 3.104.710.650.000 220.578 RSC Limited
PT Pertamina Pedeve Indonesia 2.477.682.000 5,93 1.238.841.000.000 88.015 PT Pertamina Pedeve Indonesia
Lain-lain - Publik (masing- masing
di bawah 5%) 4.552.523.296 10,89 2.276.261.648.000 159.848 Others - Public (each below 5%)
Jumlah 41.808.086.596 100,00 20.904.043.298.000 1.483.282 Total
Page 80
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/70 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
18. EKUITAS YANG DAPAT DIATRIBUSIKAN 18. EQUITY ATTRIBUTABLE TO OWNERS OF THE
KEPADA PEMILIK ENTITAS INDUK (lanjutan) PARENT (continued)
a. Modal saham (lanjutan) a. Share capital (continued)
Pada tanggal 31 Desember 2024, susunan As of December 31, 2024, the Company’s
pemegang saham Perusahaan adalah sebagai shareholders are as follows:
berikut:
Persentase
kepemilikan/
Percentage of Nilai Rp /
Lembar/Shares ownership IDR Value Nilai/Value
PT Pertamina Power Indonesia 28.568.460.000 68,83 14.284.230.000.000 1.014.248 PT Pertamina Power Indonesia
Masdar Indonesia Solar Holdings Masdar Indonesia Solar Holdings
RSC Limited 6.209.421.300 14,96 3.104.710.650.000 220.578 RSC Limited
PT Pertamina Pedeve Indonesia 2.477.682.000 5,97 1.238.841.000.000 88.608 PT Pertamina Pedeve Indonesia
Lain-lain - Publik (masing- masing
di bawah 5%) 4.252.460.849 10,24 2.126.230.424.500 151.060 Others - Public (each below 5%)
Jumlah 41.508.024.149 100,00 20.754.012.074.500 1.474.494 Total
Saham biasa memberikan hak kepada Ordinary shares entitle the holder to participate
pemegangnya untuk memperoleh dividen dan in dividends and the proceeds on winding up of
hasil dari pembubaran perusahaan sesuai the Company in proportion to the number of and
dengan proporsi jumlah dan jumlah yang amounts paid on the shares held.
dibayarkan atas saham yang dimiliki.
b. Tambahan modal disetor b. Additional paid-in capital
Rincian tambahan modal disetor pada tanggal The details of additional paid-in capital as of
30 September 2025 dan 31 Desember 2024 September 30, 2025, and December 31, 2024,
adalah sebagai berikut: are as follows:
30 September
(Tidak Diaudit)/
September 30 31 Desember/
(Unaudited), December 31,
2025 2024
Selisih nilai nominal dengan Difference in nominal value
penerimaan setoran modal 265.129 256.226 to proceeds of share capital
Difference in foreign exchange
Selisih kurs atas modal disetor (27.487) (27.487) rate on paid-in capital
Biaya penerbitan saham dalam Stock issuance costs related
rangka penawaran umum perdana (18.640) (18.640) to initial public offering
Kompensasi berbasis saham 16.687 5.998 Share-based compensation
Perbedaan antara nilai wajar Difference between fair value and
dan nilai buku aset tetap net book value of fixed assets
milik Pertamina yang dialihkan (27.804) (27.804) transferred from Pertamina
Jumlah 207.885 188.293 Total
Page 81
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/71 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
18. EKUITAS YANG DAPAT DIATRIBUSIKAN 18. EQUITY ATTRIBUTABLE TO OWNERS OF THE
KEPADA PEMILIK ENTITAS INDUK (lanjutan) PARENT (continued)
b. Tambahan modal disetor (lanjutan) b. Additional paid-in capital (continued)
Selisih nilai nominal dengan penerimaan setoran The difference between the nominal value and
modal merupakan selisih antara penerimaan the receipt of paid-in capital is the receipt in the
dalam rangka penawaran umum saham perdana context of the initial public offering of shares and
dengan nilai nominal saham baru yang tercatat. the par value of the newly registered shares.
Selisih kurs atas modal disetor merupakan The difference in foreign exchange rate on paid-
selisih antara kurs pada saat setoran modal in capital represents the difference between the
diterima dari pemegang saham dengan kurs exchange rates prevailing when the actual
yang digunakan untuk menentukan nilai nominal capital contributions were received from the
saham. stockholders and the exchange rate used to
determine the par value.
Biaya emisi saham merupakan biaya transaksi Share issuance costs are transaction costs
yang timbul dari aktivitas Penawaran Umum arising from the Initial Public Offering, including
Saham Perdana, antara lain mencakup biaya registration fees and other regulatory fees and
pendaftaran dan komisi lain yang ditetapkan, service fees paid to legal counsel, accountants,
jasa yang dibayarkan kepada penasehat hukum, and others.
akuntan, dan lain-lain.
Perbedaan nilai wajar dan nilai buku aset milik The difference between fair value and net book
Pertamina yang dialihkan merupakan value of fixed assets transferred from Pertamina
pengalihan aset panas bumi milik Pertamina represents the geothermal assets of Pertamina,
kepada Perusahaan (Catatan 2) yang diukur which were transferred to the Company (Note 2)
pada nilai wajar saat pengalihan. Pertamina and measured at fair value. Pertamina
menunjuk penilai independen KJPP Antonius appointed an independent appraiser KJPP
Setiady dan Rekan, untuk melakukan penilaian Antonius Setiady dan Rekan, to perform a fair
nilai wajar atas aset yang dialihkan sesuai value assessment for the assets were
dengan laporan No. KJPP-2010-011. transferred, following the report No. KJPP-
2010-011.
Kompensasi Berbasis Saham Share-based compensation
Perusahaan telah mengumumkan kepada Bursa The Company has announced to Bursa Efek
Efek Indonesia untuk menerbitkan MESOP Indonesia to issue MESOP with total of
dengan total 630.398.000 (angka penuh) opsi 630,398,000 (full number) stock options which
lembar saham yang akan dilakukan melalui will be exercised in several phases.
beberapa tahap.
Tujuan Program MESOP ini adalah untuk The MESOP Program aims to retain employees
mempertahankan karyawan demi pertumbuhan for the Group’s long-term growth and profitability
jangka panjang dan profitabilitas Grup dan untuk and provide rewards and incentives to
memberikan penghargaan dan insentif yang spur participants' performance. Participants of
dapat memacu kinerja peserta. Peserta program the MESOP program are the Board of Directors,
MESOP adalah Direksi, Dewan Komisaris Board of Commissioners (except Independent
(kecuali Komisaris Independen), dan karyawan Commissioners), and permanent and non-
tetap dan tidak tetap Perseroan yang aktif permanent employees of the Grup who are
bekerja dan memenuhi ketentuan pada saat actively working and meet the conditions when
Program MESOP ditawarkan. the MESOP Program is offered.
Page 82
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/72 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
18. EKUITAS YANG DAPAT DIATRIBUSIKAN 18. EQUITY ATTRIBUTABLE TO OWNERS OF THE
KEPADA PEMILIK ENTITAS INDUK (lanjutan) PARENT (continued)
b. Tambahan modal disetor (lanjutan) b. Additional paid-in capital (continued)
Kompensasi Berbasis Saham (lanjutan) Share-based compensation (continued)
30 September (Tidak Diaudit)/September 30 (Unaudited), 2025
Tahap I.1/ Tahap II/ Tahap III/ Tahap I.2/
Phase I.1 Phase II Phase III Phase I.2
Harga pelaksanaan opsi Exercise price
(dalam Rupiah) 648 1.087 838 648 (in Rupiah)
Jumlah opsi yang
diberikan (lembar Number of options
saham) 130.652.456 252.159.200 126.079.600 121.506.744 granted (shares)
Jumlah opsi yang telah
dieksekusi (lembar Number of options
saham): executed (shares):
- Jendela I Windows I -
(24 Februari 2024) (98.865.591) - - - (February 24, 2024)
- Jendela II Windows II -
(24 Agustus 2024) (8.513.839) (4.502.719) - - (August 24, 2024)
- Jendela III Windows III -
(24 Februari 2025) - - - - (February 24, 2025)
- Jendela IV Windows IV -
(24 Agustus 2025) (14.655.454) (189.232.763) (96.174.230) - (August 24, 2025)
Jumlah opsi sisa Remaining number of
(lembar saham) 8.617.572 58.423.718 29.905.370 121.506.744 options (shares)
31 Desember/December 31, 2024
Tahap I.1/ Tahap II/ Tahap III/ Tahap I.2/
Phase I.1 Phase II Phase III Phase I.2
Harga pelaksanaan opsi Exercise price
(dalam Rupiah) 648 1.087 - - (in Rupiah)
Jumlah opsi yang
diberikan (lembar Number of options
saham) 130.652.456 252.159.200 - - granted (shares)
Jumlah opsi yang telah
dieksekusi (lembar Number of options
saham): executed (shares):
- Jendela I Windows I -
(24 Februari 2024) (98.865.591) - - - (February 24, 2024)
- Jendela II Windows II -
(24 Agustus 2024) (8.513.839) (4.502.719) - - (August 24, 2024)
Jumlah opsi sisa Remaining number of
(lembar saham) 23.273.026 247.656.481 - - options (shares)
Kompensasi Berbasis Saham diselesaikan Share-based Compensation with Equity-settled
melalui lnstrumen Ekuitas. Nilai wajar dari setiap Payment. The fair value of each option right with
hak opsi yang diselesaikan dengan instrumen equity-settled payment, for the shares to be
ekuitas, untuk saham yang diterbitkan pada issued on exercise date, was estimated on the
tanggal pelaksanaan, diestimasi pada setiap grant date using market price whereby the
tanggal pemberian hak opsi dengan Company in substance will pay on behalf of the
menggunakan harga pasar untuk saham yang Group’s employees and the black-scholes
Perusahaan akan bayarkan atas nama merton (“BSM”) option pricing model whereby
Karyawan Grup dan model ”black-scholes the Group's employees will pay.
merton” (”BSM”) untuk saham yang Karyawan
Grup akan bayarkan sendiri.
Page 83
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/73 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
18. EKUITAS YANG DAPAT DIATRIBUSIKAN 18. EQUITY ATTRIBUTABLE TO OWNERS OF THE
KEPADA PEMILIK ENTITAS INDUK (lanjutan) PARENT (continued)
b. Tambahan modal disetor (lanjutan) b. Additional paid-in capital (continued)
Kompensasi Berbasis Saham (lanjutan) Share-based compensation (continued)
Model BSM MESOP tahap 1 menggunakan BSM MESOP phase I model uses the following
asumsi utama sebagai berikut: primary assumptions:
Harga saham saat tanggal pemberian opsi Share’s price at grant date
(angka penuh) Rp880 (full amount)
Harga pelaksanaan opsi (angka penuh) Rp648 Exercise price of option (full amount)
Volatilitas harga saham yang diharapkan 58% Exercise volatility of stock price
Suku bunga bebas risiko 5,57% - 6,04% Risk free interest rate
Model BSM MESOP tahap II menggunakan BSM MESOP phase II model uses the following
asumsi utama sebagai berikut: primary assumptions:
Harga saham saat tanggal pemberian opsi Share’s price at grant date
(angka penuh) Rp825 (full amount)
Harga pelaksanaan opsi (angka penuh) Rp1.087 Exercise price of option (full amount)
Volatilitas harga saham yang diharapkan 41,6% Exercise volatility of stock price
Suku bunga bebas risiko 6,08% - 6,48% Risk free interest rate
Grup membukukan pengukuran nilai wajar Group recorded the fair value measurement
atas hak opsi pada tanggal 30 September 2025 of option right on September 30, 2025, and
dan 31 Desember 2024 sebagai provisi pada December 31, 2024 as provision on the
tahun berjalan, masing-masing sebesar reporting period amounted US$2.173 and
US$2.173 dan US$1.590. US$1,590, respectively.
c. Saldo laba c. Retained earnings
Berdasarkan Undang-undang Perseroan Under Indonesian Limited Company Law,
Terbatas, perusahaan diharuskan untuk companies must establish a statutory reserve
membuat penyisihan cadangan wajib hingga amounting to at least 20% of their issued and
sekurang-kurangnya 20% dari jumlah modal paid-up capital.
yang ditempatkan dan disetor penuh.
Page 84
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/74 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
18. EKUITAS YANG DAPAT DIATRIBUSIKAN 18. EQUITY ATTRIBUTABLE TO OWNERS OF THE
KEPADA PEMILIK ENTITAS INDUK (lanjutan) PARENT (continued)
c. Saldo laba (lanjutan) c. Retained earnings (continued)
Berdasarkan RUPST tanggal 28 Mei 2024 yang Based on the AGMS on May 28, 2024, the
hasilnya dituangkan dalam Akta Notaris No. 71 results of which were stated in Notarial Deed
tanggal 28 Mei 2024, oleh Notaris Ir. Nanette No. 71, dated 28 May 2024, by Notary Ir.
Cahyanie Handari Adi Warsito, S.H., para Nanette Cahyanie Handari Adi Warsito, S.H.,
pemegang saham telah menyetujui penggunaan shareholders have approved the use of the
laba bersih Perusahaan tahun buku 2023 untuk Company's net profit for the 2023 financial year
tambahan alokasi cadangan wajib sebesar for an additional mandatory reserve allocation
US$35.169. Perseroan tidak mengalokasikan of US$35,169. The Company does not allocate
untuk cadangan lainnya any other reserves.
Berdasarkan RUPST tanggal 3 Juni 2025 yang Based on the AGMS on June 3, 2025, the
hasilnya dituangkan dalam Akta Notaris No. 17 results of which were stated in Notarial Deed
tanggal 3 Juni 2025, oleh Notaris Ir. Nanette No. 17, dated June 3, 2025, by Notary Ir.
Cahyanie Handari Adi Warsito, S.H., para Nanette Cahyanie Handari Adi Warsito, S.H.,
pemegang saham telah menyetujui penggunaan shareholders have approved the use of the
laba bersih Perusahaan tahun buku 2025 untuk Company's net profit for the 2024 financial year
tambahan alokasi cadangan wajib sebesar for an additional mandatory reserve allocation
US$24.094. Perseroan tidak mengalokasikan of US$24,094. The Company does not allocate
untuk cadangan lainnya. any other reserves.
Saldo laba yang sudah ditentukan The balance of the appropriated retained
penggunaannya pada tanggal 30 September earnings as of September 30, 2025, and
2025 dan 31 Desember 2024 masing-masing December 31, 2024, amounting to US$191,532
sebesar US$191.532 dan US$167.438. and US$167,438, respectively.
19. KEPENTINGAN NON-PENGENDALI 19. NON-CONTROLLING INTERESTS
Kepentingan nonpengendali merupakan bagian Non-controlling interests represent the non-
pemegang saham nonpengendali atas ekuitas controlling shareholders’ portion of equity of the
entitas anak sebagai berikut: following subsidiaries:
30 September
(Tidak Diaudit)/
September 30 31 Desember/
(Unaudited), December 31,
2025 2024
PT Pertamina Geothermal PT Pertamina Geothermal
Energy Kotamobagu (7) (6) Energy Kotamobagu
PT Geothermal Energi Seulawah (430) (410) PT Geothermal Energi Seulawah
Jumlah (437) (416) Total
Page 85
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/75 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
20. PENDAPATAN 20. REVENUES
30 September 30 September
(Tidak Diaudit)/ (Tidak Diaudit)/
September 30 September 30
(Unaudited), (Unaudited),
2025 2024
Penjualan Uap & Listrik - pihak berelasi Steam & Electricity Sales - related parties
PT PLN Indonesia Power (Catatan 26b) PT PLN Indonesia Power (Note 26b)
Kamojang 50.188 51.940 Kamojang
Ulubelu 33.174 31.506 Ulubelu
Lahendong 28.186 28.709 Lahendong
PLN (Catatan 26b) PLN (Note 26b)
Kamojang 61.070 59.291 Kamojang
Ulubelu 54.409 53.632 Ulubelu
Lumut Balai 39.248 30.100 Lumut Balai
Lahendong 32.059 31.315 Lahendong
Karaha 7.401 6.716 Karaha
Subjumlah Penjualan Uap & Listrik 305.735 293.209 Subtotal of Steam & Electricity Sales
Production allowances - Production allowances -
pihak ketiga (Catatan 2b) 13.126 12.812 third parties (Note 2b)
Jumlah 318.861 306.021 Total
Penjualan uap dan listrik kepada pelanggan Sales of steam and electricity to customers are based
dilakukan berdasarkan PJBU dan PJBL. Terhitung on SSCs and ESCs. Starting January 1, 2024,
mulai 1 Januari 2024, terdapat pengalihan PT PLN (Persero) transferred the invoice admission
penerimaan tagihan dan pembayaran penjualan uap and payment for steam sales of Ulubelu and
area Ulubelu dan Lahendong dari PT PLN (Persero) Lahendong to its subsidiary, PT PLN Indonesia
ke anak usahanya yaitu PT PLN Indonesia Power. Power.
Sampai dengan tanggal 30 September 2025, proyek As of September 30, 2025, the Lumut Balai 2 project
Lumut Balai 2 sudah dapat beroperasi secara penuh have been fully operated with the issuance of the
dengan telah diterbitkannya Surat Layak Operasi Operational Eligibility Letter (SLO) on June 29, 2025
(SLO) pada tanggal 29 Juni 2025 dengan kapasitas with a capacity of 55 MW and has increased revenue
55 MW serta sudah menambah pendapatan sampai until September 2025.
dengan September 2025.
21. BEBAN POKOK PENDAPATAN DAN BIAYA 21. COST OF REVENUE AND OTHER DIRECT COST
LANGSUNG LAINNYA
30 September 30 September
(Tidak Diaudit)/ (Tidak Diaudit)/
September 30 September30
(Unaudited), (Unaudited),
2025 2024
Beban penyusutan 91.492 83.473 Depreciation Expenses
Upah dan tunjangan 34.680 21.313 Salaries and allowances
Tenaga kerja dan Manpower and
jasa profesional 5.593 6.020 professional services
Jasa teknik 2.233 2.108 Technical/specialist service
Material dan peralatan 1.742 1.749 Materials and equipment
Sewa (Catatan 10) 1.610 1.753 Rental (Note 10)
Perjalanan Dinas 1.118 1.631 Travel Expense
Asuransi 1.106 1.511 Insurance
Perizinan dan lisensi 329 179 Permits and license
Lain-lain 313 277 Others
Jumlah 140.216 120.014 Total
Page 86
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/76 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
22. BEBAN UMUM DAN ADMINISTRASI 22. GENERAL & ADMINISTRATIVE EXPENSES
30 September 30 September
(Tidak Diaudit)/ (Tidak Diaudit)/
September 30 September 30
(Unaudited), (Unaudited),
2025 2024
Upah dan tunjangan 13.309 8.297 Salaries and allowances
Tenaga kerja dan jasa profesional 3.805 1.885 Manpower and professional services
Biaya jasa keuangan dan asuransi 1.368 1.429 Financial service fee and insurance
Sewa (Catatan 10) 817 433 Rental (Note 10)
Perjalanan dinas 419 481 Travel Expense
Pengembangan lingkungan 364 367 Community development
Perizinan, lisensi dan royalti 318 228 Permits, licenses and royalties
Material dan peralatan 299 253 Materials and equipment
Promosi dan sponsorship 198 893 Promotion and sponsorship
Lain-lain 268 759 Others
Jumlah 21.165 15.025 Total
23. PENDAPATAN DAN BEBAN KEUANGAN 23. FINANCE INCOME AND EXPENSES
a. Pendapatan keuangan a. Finance income
30 September 30 September
(Tidak Diaudit)/ (Tidak Diaudit)/
September 30 September 30
(Unaudited), (Unaudited),
2025 2024
Bunga deposito 13.162 14.422 Interest from time deposits
Bunga jasa giro 8.711 10.206 Interest from current account
Lain-lain 168 128 Others
Jumlah 22.041 24.756 Total
b. Beban keuangan b. Finance expenses
30 September 30 September
(Tidak Diaudit)/ (Tidak Diaudit)/
September 30 September 30
(Unaudited), (Unaudited),
2025 2024
Bunga obligasi 17.558 10.378 Bonds interest
Bunga pinjaman Long-term loan
jangka panjang 5.150 6.361 interest
Bunga atas sewa (Catatan 10) 167 56 Interest on lease (Note 10)
Jumlah 22.875 16.795 Total
Page 87
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/77 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
24. PENDAPATAN LAIN-LAIN, BERSIH DAN (RUGI)/ 24. OTHER INCOME, NET AND (LOSS)/GAIN
LABA SELISIH KURS FOREIGN EXCHANGE
a. Pendapatan lain-lain, bersih a. Other income, net
30 September 30 September
(Tidak Diaudit)/ (Tidak Diaudit)/
September 30 September 30
(Unaudited), (Unaudited),
2025 2024
Pendapatan dari denda kontrak Income from penalties contracts
dan pembelian material 1.043 177 and materials purchases
Penyisihan penurunan nilai Allowance for decline in value
- persediaan 68 - - of inventories
Penjualan kredit karbon 4 141 Carbon credit sales
Lain-lain, bersih 3 496 Others, net
Jumlah 1.118 814 Total
b. (Rugi)/laba selisih kurs b. (Loss)/gain foreign exchange
(Rugi)/laba selisih kurs terutama berasal dari (Loss)/gain on foreign exchange mainly resulted
translasi aset dan liabilitas moneter dalam mata from the translation of assets and liabilities in
uang asing dan perbedaan nilai tukar transaksi foreign currencies and differences in exchange
dari kegiatan usaha Grup dalam mata uang rates on the Group’s operational transactions
asing, terutama disebabkan oleh perubahan nilai denominated in foreign currencies, primarily due
tukar dolar AS terhadap Yen Jepang dan to changes in the exchange rate of the US dollar
Rupiah. against the Japanese Yen and Rupiah.
25. PERPAJAKAN 25. TAXATION
a. PPN yang dapat ditagihkan kembali a. Reimbursable VAT
Berdasarkan Keputusan Menteri Keuangan Following the Decision Letter of the Minister of
No. 766/KMK.04/1992 tanggal 13 Juli 1992 dan Finance No. 766/KMK.04/1992, dated July 13,
amandemennya No. 209/KMK.04/1998 tanggal 1992, and its amendment
9 April 1998, permintaan pengembalian PPN No. 209/KMK.04/1998, dated April 9, 1998,
kepada Direktorat Jenderal Anggaran (“DJA”) requests for reimbursements of VAT may be
Kementerian Keuangan dapat diajukan apabila made to the Directorate General of Budgeting
masing-masing wilayah kerja panas bumi yang (“DGB”) of the Ministry of Finance once the
terkait telah menghasilkan keuntungan. Jumlah related geothermal working areas have
PPN yang dapat dikembalikan tersebut generated income. The maximum reimbursable
maksimal sebesar bagian Pemerintah yang VAT amount is limited to the Government’s
telah disetorkan untuk masing-masing wilayah share of revenue from the respective working
kerja (Catatan 3p). areas, being the income tax paid by the
Company (Note 3p).
Page 88
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/78 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
25. PERPAJAKAN (lanjutan) 25. TAXATION (continued)
a. PPN yang dapat ditagihkan kembali (lanjutan) a. Reimbursable VAT (continued)
Berdasarkan Peraturan Menteri Keuangan Based on the Regulation of Minister of Finance
Republik Indonesia No. 142/PMK.02/2013 No. 142/PMK.02/2013 dated October 18, 2013,
tanggal 18 Oktober 2013, seluruh PPN yang all reimbursable VAT paid under the Company’s
dapat ditagihkan kembali yang telah disetor atas name and tax number will be reimbursed to the
nama dan nomor pokok wajib pajak Perusahaan Company based on the amount approved by the
akan dibayarkan kepada Perusahaan DGB.
berdasarkan jumlah pengembalian yang
disetujui oleh DJA.
Mutasi saldo PPN yang dapat ditagihkan Movements of reimbursable VAT during
kembali selama 30 September 2025 dan 31 September 30, 2025, and December 31, 2024,
Desember 2024 adalah sebagai berikut: are as follows:
30 September
(Tidak Diaudit)/
September 30 31 Desember/
(Unaudited), December 31,
2025 2024
Saldo awal 115.635 114.477 Beginning balance
Penambahan selama Additions
tahun berjalan 9.347 14.260 during the years
Dibebankan ke laba/rugi Charged to profit/loss
tahun berjalan - (220) during the years
Pengembalian selama Reimbursements
tahun berjalan (14.784) (7.790) during the years
Efek perubahan Effect of exchange
nilai kurs (3.609) (5.092) rate changes
Saldo akhir 106.589 115.635 Ending balance
Bagian lancar 7.086 17.175 Current portion
Bagian tidak lancar 99.503 98.460 Non-current portion
Jumlah 106.589 115.635 Total
PPN yang dapat ditagihkan kembali 113.853 122.907 Reimbursable-VAT
Penyisihan keterpulihan PPN (7.264) (7.272) Provision for uncollectible VAT
Jumlah, bersih 106.589 115.635 Total, net
Saldo bagian lancar PPN yang dapat ditagihkan The current portion of reimbursable VAT
kembali merupakan jumlah PPN yang represents VAT expected to be reimbursed by
diharapkan pengembaliannya dari DJA dalam the DGB within one year from the statements of
kurun waktu satu tahun sejak tanggal laporan financial position dates based on management’s
posisi keuangan yang ditentukan berdasarkan best estimate.
estimasi terbaik manajemen.
Page 89
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/79 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
25. PERPAJAKAN (lanjutan) 25. TAXATION (continued)
b. Pajak dibayar dimuka b. Prepaid Taxes
30 September
(Tidak Diaudit)/
September 30 31 Desember/
(Unaudited), December 31,
2025 2024
Pajak penghasilan pasal 25 524 - Income taxes article 25
Jumlah 524 - Total
Pajak dibayar dimuka atas pajak penghasilan The prepaid income tax represents an
merupakan kelebihan bayar atas setoran bagian overpayment of the government's share of the
pemerintah tahun 2024 untuk area Lumut Balai. 2024 tax payment for the Lumut Balai area. The
Pajak dibayar dimuka atas deposit coretax prepaid Coretax deposit represents a tax
merupakan deposit untuk pembayaran pajak payment deposit in accordance with DGT
sesuai dengan peraturan DJP terkait regulations regarding the use of the Coretax
penggunaan aplikasi Coretax. application.
c. Utang Pajak c. Taxes Payable
30 September
(Tidak Diaudit)/
September 30 31 Desember/
(Unaudited), December 31,
2025 2024
Pajak penghasilan Income taxes
- Pasal 29 12.202 1.879 Article 29 -
- Pasal 23/26 72 205 Article 23/26 -
- Pasal 4(2) 86 248 Article 4 (2) -
- Pasal 21 86 774 Article 21 -
PPN 958 2.649 VAT
Jumlah 13.404 5.755 Total
d. Beban pajak penghasilan d. Income tax expense
30 September 30 September
(Tidak Diaudit)/ (Tidak Diaudit)/
September 30 September 30
(Unaudited), (Unaudited),
2025 2024
Kini 42.187 57.386 Current
Tangguhan 1.076 1.850 Deferred
Jumlah 43.263 59.236 Total
Page 90
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/80 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
25. PERPAJAKAN (lanjutan) 25. TAXATION (continued)
d. Beban pajak penghasilan (lanjutan) d. Income tax expense (continued)
Perhitungan beban pajak penghasilan kini The calculation of current corporate income tax
adalah sebagai berikut: expense is as follows:
30 September 30 September
(Tidak Diaudit)/ (Tidak Diaudit)/
September 30 September 30
(Unaudited), (Unaudited),
2025 2024
Laba konsolidasian sebelum Consolidated profit before
pajak penghasilan 147.519 193.206 income tax expense
Rugi sebelum pajak - Loss before income
Entitas Anak 188 133 tax - Subsidiaries
Laba sebelum beban Income before
pajak penghasilan 147.707 193.339 income tax expense
Beda temporer: Temporary differences:
Biaya provisi imbalan Provision for employee benefits
- karyawan Perusahaan (146) 2.101 - direct hire employee
Penyisihan penurunan nilai Allowance for decline in value
- persediaan (68) - - of inventories
Aset hak guna (2.251) - Right of use assets
Kompensasi berbasis saham 592 - Share-based compensation
Utang pihak yang berelasi Related party payables
beban imbalan seconded employees
karyawan perbantuan - 839 benefits costs
Aset tetap (1.291) (8.382) Fixed assets
Subjumlah beda Subtotal temporary
temporer (3.164) (5.442) differences
Beda tetap: Permanent differences:
Donasi 664 667 Donations
Penyusutan asset tetap yang Non-tax deductible
tidak dapat dikurangi 379 582 fixed assets depreciation
Beban promosi dan Promotion and
representasi 142 791 representation expenses
Kompensasi karyawan 349 2.278 Employee compensation
Bagian laba dari Share profit of
ventura bersama 23 - joint venture
Lain-lain - 1.241 Others
Pendapatan bunga yang
sudah terkena pajak Interest income
penghasilan final (22.018) (24.672) subject to final tax
Subjumlah beda tetap (20.461) (19.113) Subtotal permanent differences
Pendapatan kena pajak 124.082 168.784 Taxable income
Tarif pajak 34% 34% Tax rate
Beban pajak penghasilan Current income tax expense
kini – Perusahaan 42.187 57.386 the Company -
Beban pajak penghasilan Current income tax expense
kini – Entitas Anak - - Subsidiaries -
Beban pajak penghasilan Consolidated current income
kini konsolidasian 42.187 57.586 tax expense
Page 91
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/81 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
25. PERPAJAKAN (lanjutan) 25. TAXATION (continued)
d. Beban pajak penghasilan (lanjutan) d. Income tax expense (continued)
Rekonsiliasi antara laba sebelum beban pajak The reconciliation between income before
penghasilan dari kegiatan usaha panas bumi income tax expense from geothermal activities
dengan pendapatan kena pajak yang terkena and taxable income subject to tax under the
aturan pajak khusus panas bumi adalah sebagai geothermal tax regime is as follows:
berikut:
30 September 30 September
(Tidak Diaudit)/ (Tidak Diaudit)/
September 30 September 30
(Unaudited), (Unaudited),
2025 2024
Laba konsolidasian sebelum Consolidated profit before
pajak penghasilan 147.519 193.206 income tax expense
Tarif pajak 34% 34% Tax rate
Pajak penghasilan dengan Income tax
tarif pajak efektif 50.157 65.690 at the effective tax rate
Kompensasi karyawan 119 774 Employee compensation
Bagian laba dari Share profit of
ventura bersama 8 - joint venture
Donasi 225 227 Donations
Penyusutan asset tetap yang Non-tax deductible
tidak dapat dikurangi 129 198 fixed assets depreciation
Beban promosi dan Promotion and
representasi 47 269 representation expense
Lain-lain - 422 Others
Pendapatan bunga yang
sudah terkena pajak Interest income
penghasilan final (7.486) (8.389) subject to final tax
Pengaruh pajak atas Tax effects on loss in
rugi entitas anak 64 45 tax expense
Beban pajak penghasilan Consolidated income
konsolidasian 43.263 59.236 tax expense
Perhitungan utang pajak kini terutang pada The analysis of the current income tax payable
tanggal 30 September 2025 dan 31 Desember as at September 30, 2025, and December 31,
2024, adalah sebagai berikut: 2024, is as follows:
30 September 30 September
(Tidak Diaudit)/ (Tidak Diaudit)/
September 30 September 30
(Unaudited), (Unaudited),
2025 2024
Beban pajak penghasilan kini dari Current income tax expense
kegiatan usaha panas bumi 42.187 57.386 involving geothermal activities
Dikurangi: Less:
Pajak penghasilan badan Payment of corporate
yang sudah dibayar (25.911) (37.268) income tax
Pajak periode sebelumnya (1.860) (602) Previous tax period
Pajak penghasilan dibayar Payment of income tax
dimuka pasal 22 dan 23 (2.214) (1.948) article 22 and 23
Utang pajak penghasilan badan 12.202 17.568 Corporate income tax payable
Page 92
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/82 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
25. PERPAJAKAN (lanjutan) 25. TAXATION (continued)
e. Pajak tangguhan e. Deferred tax
30 September (Tidak Diaudit)/September 30 (Unaudited), 2025
Dikreditkan/ Diakui di
(dibebankan) penghasilan
ke laporan komprehensif
laba-rugi/ lain/Charged
Saldo awal/ Credited/ to other Saldo akhir/
Beginning (charged) to comprehensive Ending
balance profit or loss income balance
Provisi imbalan pekerja Provision for secondee
perbantuan 1.396 - - 1.396 employee benefits obligations
Provisi imbalan karyawan Provision for direct hire
perusahaan 2.080 (50) - 2.030 employee benefits obligations
Perubahan nilai wajar Changes in fair value
aset keuangan (7.383) - - (7.383) on financial assets
Program kepemilikan saham Management and employee
manajemen dan karyawan 736 201 - 937 stock ownership program
Aset hak guna (89) (765) - (854) Right of use assets
Penyisihan penurunan
nilai persediaan 726 (23) 703 Inventory provision
Provisi atas PPN yang Provision for
dapat ditagihkan kembali 2.177 - - 2.177 reimbursable VAT
Aset tetap (21.533) (439) - (21.972) Fixed assets
Jumlah (21.890) (1.076) - (22.966) Total
31 Desember/December 31, 2024
Dikreditkan/ Diakui di
(dibebankan) penghasilan
ke laporan komprehensif
laba-rugi/ lain/Charged
Saldo awal/ Credited/ to other Saldo akhir/
Beginning (charged) to comprehensive Ending
balance profit or loss income balance
Provisi imbalan pekerja Provision for secondee
perbantuan 1.386 192 (182) 1.396 employee benefits obligations
Provisi imbalan karyawan Provision for direct hire
perusahaan 5.035 (2.280) (675) 2.080 employee benefits obligations
Perubahan nilai wajar Changes in fair value
aset keuangan (9.860) - 2.477 (7.383) on financial assets
Program kepemilikan saham Management and employee
manajemen dan karyawan - 736 - 736 stock ownership program
Aset hak guna 33 (122) - (89) Right of use assets
Penyisihan penurunan
nilai persediaan - 726 726 Inventory provision
Provisi atas PPN yang Provision for
dapat ditagihkan kembali 2.102 75 - 2.177 reimbursable VAT
Aset tetap (14.162) (7.371) - (21.533) Fixed assets
Jumlah (15.466) (8.044) 1.620 (21.890) Total
f. Administrasi f. Administration
Undang-undang Perpajakan yang berlaku di The taxation laws of Indonesia require that each
Indonesia mengatur bahwa masing-masing company in the Group submit individual tax
entitas dalam Grup menghitung, menetapkan, returns based on self-assessment. Under the
dan membayar sendiri besarnya jumlah pajak prevailing regulations, the DJP may assess or
yang terutang secara individu. Berdasarkan amend taxes, currently within five years of the
peraturan perundang-undangan yang berlaku, time the tax becomes due.
DJP dapat menetapkan atau mengubah jumlah
pajak terutang, dalam batas waktu lima tahun
sejak saat terutangnya pajak.
Page 93
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/83 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
26. SALDO DAN TRANSAKSI DENGAN PIHAK YANG 26. RELATED PARTY BALANCES AND
BERELASI TRANSACTIONS
a. Sifat dari transaksi dengan pihak yang a. Nature of related party transactions
berelasi
Transaksi pihak yang berelasi antara Grup Related party transactions between the Group
dengan Pertamina dan anak perusahaannya and Pertamina and its subsidiaries consist of
meliputi pembiayaan, pembebanan imbalan financing, the allocation of seconded employees
kerja karyawan perbantuan, pembebanan biaya past service cost, interest expense, insurance
bunga, biaya asuransi, dividen, dan transaksi expense, dividend, and other goods/services
penyerahan barang/jasa lainnya. transactions.
Sifat dan relasi dengan pihak-pihak yang The nature of the relationships with the related
mengadakan transaksi dengan Perusahaan: parties are as follows:
Hubungan/ Pihak-pihak yang berelasi/ Sifat transaksi/
Relations Related parties Nature of transaction
● Pemegang saham tidak langsung/ PT Pertamina (Persero) ("Pertamina") Pembelian barang dan jasa dan
Indirect shareholders pinjaman pemegang saham/
purchases of goods and service
and loan from shareholder
● Pemegang saham langsung/ PT Pertamina Power Indonesia (“PPI”) Pembayaran dividen, pembelian
Direct shareholders barang dan jasa, pendapatan/
Dividend payment purchases of
Goods and service, income
PT Pertamina Pedeve Indonesia Pembayaran dividen/
(”Pedeve”) Dividend payment
● Entitas di bawah pengendalian yang PT Pertamina Hulu Energi (“PHE”) Pendapatan dividen/
sama/ Entity under common control Dividend income
PT Pertamina Patra Niaga (“Patra Niaga”) Pembelian barang dan jasa/
PT Patra Jasa (“Patra Jasa”) Purchase of goods and services
PT Asuransi Tugu Pratama Indonesia Tbk
(“ATPI”)
PT Pertamina Bina Medika IHC
(“Pertamedika”)
PT Pertamina Training & Consulting
(“PTC”)
PT Pratama Mitra Sejati (“PMS”)
PT Pertamina Drilling Services (“PDSI”)
PT Mitra Tour & Travel (“Mitratour”)
PT Prima Armada Raya (“PAR”)
● Ventura bersama/Joint venture PT Cahaya Anagata Energy (”CAE”)
Page 94
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/84 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
26. SALDO DAN TRANSAKSI DENGAN PIHAK YANG 26. RELATED PARTY BALANCES AND
BERELASI (lanjutan) TRANSACTIONS (continued)
a. Sifat dari transaksi dengan pihak yang a. Nature of related party transactions
berelasi (lanjutan) (continued)
Sifat dan relasi dengan pihak-pihak yang The nature of the relationships with the related
mengadakan transaksi dengan Perusahaan: parties are as follows:
Hubungan/ Pihak-pihak yang berelasi/ Sifat transaksi/
Relations Related parties Nature of transaction
● Entitas berelasi dengan Pemerintah/ PT PLN (Persero) (“PLN”) Penjualan uap dan listrik/
Government related entities PT PLN Indonesia Power Sales of steam and electricity
PT Bank Mandiri (Persero) Tbk Penempatan giro dan deposito/
(“Bank Mandiri”) current account and
PT Bank Negara Indonesia (Persero) Tbk time deposits
(“Bank BNI”)
PT Bank Rakyat Indonesia (Persero) Tbk
(“Bank BRI”)
PT Bank Tabungan Negara (Persero) Tbk
(“Bank BTN”)
PT Bank Syariah Indonesia (Persero) Tbk
(“Bank BSI”)
PT Wijaya Karya (Persero) Tbk (“Wika”) Pembelian barang dan jasa/
PT Telekomunikasi Indonesia Tbk Purchase of goods and services
(“Telkom”)
Direktorat Jenderal Anggaran (“DJA”) Perpajakan/taxation
b. Penjualan uap dan listrik b. Sales of steam and electricity
30 September 30 September
(Tidak Diaudit)/ (Tidak Diaudit)/
September 30 September 30
(Unaudited), (Unaudited),
2025 2024
PLN 194.187 181.054 PLN
PT PLN Indonesia Power 111.548 112.155 PT PLN Indonesia Power
Jumlah 305.735 293.209 Total
Persentase terhadap total
pendapatan/
Percentage to total
revenues (%)
30 September 30 September
(Tidak Diaudit)/ (Tidak Diaudit)/
September 30 September 30
(Unaudited), (Unaudited),
2025 2024
PLN 60,9 59,2 PLN
PT PLN Indonesia Power 35,0 36,7 PT PLN Indonesia Power
Jumlah 95,9 95,8 Total
Penjualan kepada PLN hanya atas penjualan Sales to PLN is only sales from the Group’s own
operasi sendiri Grup. operations.
Page 95
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/85 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
26. SALDO DAN TRANSAKSI DENGAN PIHAK YANG 26. RELATED PARTY BALANCES AND
BERELASI (lanjutan) TRANSACTIONS (continued)
c. Pembelian barang dan jasa c. Purchases of goods and services
30 September 30 September
(Tidak Diaudit)/ (Tidak Diaudit)/
September 30 September 30
(Unaudited), (Unaudited),
2025 2024
ATPI 1.691 2.033 ATPI
PTC 1.447 1.280 PTC
Patra Jasa 1.314 1.241 Patra Jasa
PMS 1.239 1.047 PMS
Patra Niaga 955 6.021 Patra Niaga
Bina Medika 458 547 Bina Medika
PAR 249 327 PAR
PDSI 150 514 PDSI
Mitra Tour 93 426 Mitra Tour
Lain-lain (masing-masing
di bawah US$300) 625 99 Others (each below US$300)
Jumlah 8.221 13.535 Total
Persentase terhadap total
beban pokok pendapatan/
Percentage to total
cost of revenues (%)
30 September 30 September
(Tidak Diaudit)/ (Tidak Diaudit)/
September 30 September 30
(Unaudited), (Unaudited),
2025 2024
ATPI 1,2 1,7 ATPI
PTC 1,0 1,1 PTC
Patra Jasa 0,9 1,0 Patra Jasa
PMS 0,9 0,9 PMS
Patra Niaga 0,7 5,0 Patra Niaga
Bina Medika 0,3 0,5 Bina Medika
PAR 0,2 0,3 PAR
PDSI 0,1 0,4 PDSI
Mitra Tour 0,1 0,4 Mitra Tour
Lain-lain 0,5 0,0 Others
Jumlah 5,9 11,3 Total
Barang dan jasa dibeli dari pihak-pihak yang Goods and services are bought from the
disebutkan di atas berdasarkan syarat-syarat abovementioned parties on standard
komersial. commercial terms and conditions.
d. Pendapatan bunga d. Interest income
Seluruh pendapatan bunga berasal dari bank All interest income was earned from state-owned
milik negara. banks.
e. Kas dan setara kas dan kas yang dibatasi e. Cash and cash equivalents and restricted
penggunaannya cash
Seluruh saldo kas dan setara kas dan kas yang All cash and cash equivalents, as well as
dibatasi penggunaannya ditempatkan pada restricted cash, are placed at state-owned.
bank milik negara.
Page 96
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/86 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
26. SALDO DAN TRANSAKSI DENGAN PIHAK YANG 26. RELATED PARTY BALANCES AND
BERELASI (lanjutan) TRANSACTIONS (continued)
f. Piutang usaha - pihak yang berelasi f. Trade receivables - related parties
30 September
(Tidak Diaudit)/
September 30 31 Desember/
(Unaudited), December 31,
2025 2024
PLN 112.980 92.610 PLN
PT PLN Indonesia Power 46.364 32.017 PT PLN Indonesia Power
Jumlah 159.344 124.627 Total
Persentase terhadap total aset/
Percentage to total assets (%)
30 September
(Tidak Diaudit)/
September 30 31 Desember/
(Unaudited), December 31,
2025 2024
PLN 3,8 3,1 PLN
PT PLN Indonesia Power 1,6 1,1 PT PLN Indonesia Power
Jumlah 5,4 4,2 Total
Piutang usaha dari PLN termasuk penjualan Trade receivables from PLN include pass-
pass-through dengan kontraktor KOB. Per through sales involving the JOC contractors. As
tanggal 30 September 2025 dan 31 Desember of September 30, 2025, and December 31,
2024, piutang usaha dari transaksi pass-through 2024, trade receivables arising from pass-
masing-masing sebesar US$67.196 dan through transactions between the Group and
US$67.093 (Catatan 6a). KOB contractors amounted to US$67,196 and
US$67,093, respectively (Notes 6a).
g. Piutang lain-lain - pihak yang berelasi g. Other receivables - related parties
30 September
(Tidak Diaudit)/
September 30 31 Desember/
(Unaudited), December 31,
2025 2024
Bagian jangka pendek Current Portion:
DJA 1.874 1.016 DJA
PLN 345 345 PLN
PPI - 659 PPI
PHE - 1.994 PHE
Lain-lain (masing-masing
di bawah US$300) 5 27 Others (each below US$300)
Subjumlah 2.224 4.041 Subtotal
Bagian jangka panjang: Non-current portion:
PLN 7.021 7.529 PLN
Subjumlah 7.021 7.529 Subtotal
Jumlah 9.245 11.570 Total
Page 97
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/87 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
26. SALDO DAN TRANSAKSI DENGAN PIHAK YANG 26. RELATED PARTY BALANCES AND
BERELASI (lanjutan) TRANSACTIONS (continued)
g. Piutang lain-lain - pihak yang berelasi g. Other receivables - related parties (continued)
(lanjutan)
Persentase terhadap total asset/
Percentage to total assets (%)
30 September
(Tidak Diaudit)/
September 30 31 Desember/
(Unaudited), December 31,
2025 2024
Bagian jangka pendek: Current portion:
DJA 0,1 0,0 DJA
PLN 0,0 0,0 PLN
PPI - 0,0 PPI
PHE - 0,1 PHE
Lain-lain 0,0 0,0 Others
Subjumlah 0,1 0,1 Subtotal
Bagian jangka panjang: Current portion:
PLN 0,2 0,3 PLN
Subjumlah 0,2 0,3 Subtotal
Jumlah 0,3 0,4 Total
h. Utang usaha - pihak yang berelasi h. Trade payables - related parties
30 September
(Tidak Diaudit)/
September 30 31 Desember/
(Unaudited), December 31,
2025 2024
Patra Niaga 650 1.064 Patra Niaga
Wika 124 659 Wika
Lain-lain (masing-masing
di bawah US$300) 98 511 Others (each below US$300)
Jumlah 872 2.234 Total
Persentase terhadap total liabilitas/
Percentage to total liabilities (%)
30 September
(Tidak Diaudit)/
September 30 31 Desember/
(Unaudited), December 31,
2025 2024
Patra Niaga 0,1 0,1 Patra Niaga
Wika 0,0 0,1 Wika
Lain-lain 0,0 0,0 Others
Jumlah 0,1 0,2 Total
Page 98
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/88 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
26. SALDO DAN TRANSAKSI DENGAN PIHAK YANG 26. RELATED PARTY BALANCES AND
BERELASI (lanjutan) TRANSACTIONS (continued)
i. Utang lain-lain - pihak yang berelasi i. Other payables - related parties
30 September
(Tidak Diaudit)/
September 30 31 Desember/
(Unaudited), December 31,
2025 2024
Pertamina 7.113 7.296 Pertamina
PMS 92 2.385 PMS
Lain-lain (masing-masing
di bawah US$300) 376 456 Others (each below US$300)
Jumlah 7.581 10.137 Total
Persentase terhadap total liabilitas/
Percentage to total liabilities (%)
30 September
(Tidak Diaudit)/
September 30 31 Desember/
(Unaudited), December 31,
2025 2024
Pertamina 0,7 0,7 Pertamina
PMS 0,0 0,2 PMS
Lain-lain 0,1 0,1 Others
Jumlah 0,8 1,0 Total
j. Pinjaman jangka panjang - pihak yang j. Long-term loans - related party
berelasi
30 September
(Tidak Diaudit)/
September 30 31 Desember/
(Unaudited), December 31,
2025 2024
Bagian jangka pendek: Current portion:
Dolar AS 9.751 9.570 US dollar
Yen 8.920 5.602 Yen
Subjumlah 18.671 15.172 Subtotal
Bagian jangka panjang: Non-current portion:
Dolar AS 202.276 217.197 US dollar
Yen 140.755 110.850 Yen
Subjumlah 343.031 328.047 Subtotal
Jumlah pinjaman 361.702 343.219 Total loan
Page 99
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/89 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
26. SALDO DAN TRANSAKSI DENGAN PIHAK YANG 26. RELATED PARTY BALANCES AND
BERELASI (lanjutan) TRANSACTIONS (continued)
j. Pinjaman jangka panjang - pihak yang j. Long-term loans - related party (continued)
berelasi (lanjutan)
Persentase terhadap total liabilitas/
Percentage to total liabilities (%)
30 September
(Tidak Diaudit)/
September 30 31 Desember/
(Unaudited), December 31,
2025 2024
Bagian jangka pendek: Current portion:
Dolar AS 1,0 1,0 US dollar
Yen 0,9 0,6 Yen
Subjumlah 1,9 1,6 Subtotal
Bagian jangka panjang: Non-current portion:
Dolar AS 21,1 22,0 US dollar
Yen 14,7 11,2 Yen
Subjumlah 35,8 33,2 Subtotal
Jumlah pinjaman 37,7 34,8 Total loan
Pinjaman jangka panjang - pihak yang berelasi Long-term loans - related party represent loans
merupakan pinjaman dari Pertamina from Pertamina (Note 31b) to support the
(Catatan 31b) untuk membiayai belanja modal Group’s capital expenditures.
Grup.
Dalam pinjaman jangka panjang - pihak yang In the long-term loans, related parties include a
berelasi tersebut termasuk porsi penempatan portion of cash placement as an escrow
escrow account atas komitmen eksplorasi PGEL account of PGEL’s exploration commitment in
sebesar US$10.000, yang telah dikembalikan ke the amount of US$10,000, which was settled to
rekening giro Perusahaan pada tanggal 4 Maret the Company's current account on March 4,
2022. Perusahaan telah mengambalikan dana 2022. The company has returned this
komiten ini ke Pertamina (Persero) pada tanggal commitment fund to Pertamina (Persero) on
4 September 2025. September 4, 2025.
Beban keuangan, termasuk beban keuangan Finance costs, including capitalised finance
yang dikapitalisasi, merupakan beban yang expenses, are related to loans obtained from
timbul dari perjanjian pinjaman dengan Pertamina.
Pertamina.
Page 100
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/90 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
26. SALDO DAN TRANSAKSI DENGAN PIHAK YANG 26. RELATED PARTY BALANCES AND
BERELASI (lanjutan) TRANSACTIONS (continued)
k. Biaya yang masih harus dibayar - pihak yang k. Accrued expenses - related parties
berelasi
30 September
(Tidak Diaudit)/
September 30 31 Desember/
(Unaudited), December 31,
2025 2024
ATPI 3.154 - ATPI
PDSI 801 2.293 PDSI
PMS 225 470 PMS
PTC 96 1.846 PTC
Lain-lain (masing-masing
di bawah US$300) 402 548 Others (each below US$300)
Jumlah 4.678 5.157 Total
Persentase terhadap total liabilitas/
Percentage to total liabilities (%)
30 September
(Tidak Diaudit)/
September 30 31 Desember/
(Unaudited), December 31,
2025 2024
ATPI 0,3 - ATPI
PDSI 0,1 0,2 PDSI
PMS 0,0 0,0 PMS
PTC 0,0 0,2 PTC
Lain-lain (masing-masing
di bawah US$300) 0,1 0,1 Others (each below US$300)
Jumlah 0,5 0,5 Total
l. Kompensasi manajemen kunci l. Key management compensation
Manajemen kunci termasuk direksi dan personil Key management includes the directors and
lain yang mempunyai peran kunci dalam Grup. other key personnel having key roles in the
Kompensasi yang dibayar atau terutang untuk Group. The compensation paid or payable to key
manajemen kunci atas dasar jasa pekerja management for employee services is shown
adalah sebagai berikut: below:
30 September 30 September
(Tidak Diaudit)/ (Tidak Diaudit)/
September 30 September 30
(Unaudited), (Unaudited),
2025 2024
Gaji dan imbalan pekerja Salaries and other short-term
jangka pendek 596 676 employee benefits
Imbalan pasca kerja 125 155 Post-employment benefits
Jumlah 721 831 Total
Page 101
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/91 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
27. DIVIDEN PER SAHAM 27. DIVIDENDS PER SHARE
Pada tanggal 28 Mei 2024 dalam Rapat Umum On May 28, 2024, at the Company's Annual General
Pemegang Saham Tahunan Perusahaan yang Meeting of Shareholders as outlined in Notarial Deed
dituangkan dalam Akta Notaris No. 71 tanggal 28 Mei No. 71 dated 28 May 2024, by Notary Ir. Nanette
2024, oleh Notaris Ir. Nanette Cahyanie Handari Adi Cahyanie Handari Adi Warsito, S.H., shareholders
Warsito, S.H., para pemegang saham telah have approved the distribution of cash dividends from
menyetujui pembagian dividen tunai yang berasal 2023 net profit of US$128,400 or US$0.003 (full
dari laba bersih tahun 2023 sebesar US$128.400 amount) per common share. Payment of the 2023
atau US$0,003 (nilai penuh) per saham biasa. cash dividend was paid on June 28, 2024.
Pembayaran atas dividen tunai tahun 2023 tersebut
telah dibayarkan pada tanggal 28 Juni 2024.
Pada tanggal 3 Juni 2025 dalam Rapat Umum On June 3, 2025, at the Company's Annual General
Pemegang Saham Tahunan Perusahaan yang Meeting of Shareholders as outlined in Notarial Deed
dituangkan dalam Akta Notaris No. 17 tanggal 3 Juni No. 17 dated June 3, 2025, by Notary Ir. Nanette
2025, oleh Notaris Ir. Nanette Cahyanie Handari Adi Cahyanie Handari Adi Warsito, S.H., shareholders
Warsito, S.H., para pemegang saham telah have approved the distribution of cash dividends from
menyetujui pembagian dividen tunai yang berasal 2024 net profit of US$136,400 or US$0.003 (full
dari laba bersih tahun 2024 sebesar US$136.400 amount) per common share.
atau US$0,003 (nilai penuh) per saham biasa.
28. LABA PER SAHAM 28. EARNINGS PER SHARE
Rekonsiliasi perhitungan laba per saham adalah The reconciliation of earnings per share calculation
sebagai berikut: is as follows:
a. Laba per saham dasar a. Basic earnings per share
30 September 30 September
(Tidak Diaudit)/ (Tidak Diaudit)/
September 30 September 30
(Unaudited), (Unaudited),
2025 2024
Laba periode berjalan Profit for
yang dapat diatribusikan the period attributable
kepada pemilik entitas induk 104.277 133.993 to owner of the parent
Jumlah rata-rata tertimbang Weighted average
saham 41.808.086.596 41.505.157.222 number of shares
Laba per saham dasar Earnings per share
diatribusikan kepada attributable to owners
pemilik entitas induk of the parent entity
(nilai penuh) 0,0025 0,0032 (full amount)
Page 102
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/92 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
28. LABA PER SAHAM (lanjutan) 28. EARNINGS PER SHARE (continued)
b. Laba per saham dilusian b. Diluted earnings per share
30 September 30 September
(Tidak Diaudit)/ (Tidak Diaudit)/
September 30 September 30
(Unaudited), (Unaudited),
2025 2024
Laba periode berjalan Profit for
yang dapat diatribusikan the period attributable
kepada pemilik entitas induk 104.277 133.993 to owner of the parent
Jumlah rata-rata tertimbang Weighted average
saham 42.026.540.000 41.778.953.656 number of shares
Laba per saham dilusian Diluted earnings per share
diatribusikan kepada attributable to owners
pemilik entitas induk of the parent entity
(nilai penuh) 0,0025 0,0032 (full amount)
c. Jumlah rata-rata tertimbang saham yang c. Weighted average number of shares used as
digunakan sebagai penyebut the denominator
30 September 30 September
(Tidak Diaudit)/ (Tidak Diaudit)/
September 30 September 30
(Unaudited), (Unaudited),
2025 2024
Jumlah rata-rata tertimbang saham Weighted average number of
yang digunakan sebagai ordinary shares used as
penyebut dalam perhitungan the denominator in calculating
laba per saham dasar 41.808.086.596 41.505.157.222 basics earning per share
Penyesuaian untuk perhitungan Adjustment for calculation of
laba per saham dilusian: diluted earnings per share:
Kompensasi berbasis saham 218.453.404 273.796.434 Share-based compensation
Jumlah rata-rata tertimbang saham Weighted average number of
yang digunakan sebagai ordinary shares used as
penyebut dalam perhitungan the denominator in calculating
laba per saham dilusian 42.026.540.000 41.778.953.656 diluted earnings per share
Pada tanggal 30 September 2025 dan 31 As of September 30, 2025, and December 31,
Desember 2024, kompensasi berbasis saham 2024, share-based compensation granted to
yang diberikan kepada karyawan bersifat dilutif employees is dilutive and presented in the
dan disajikan pada laporan laba rugi dan consolidated statements of profit or loss and other
penghasilan komprehensif lain konsolidasian. comprehensive income.
Page 103
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/93 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
29. ASET DAN LIABILITAS KEUANGAN 29. FINANCIAL ASSETS AND LIABILITIES
Tabel berikut menyajikan aset dan liabilitas The following tables set out the Group’s financial
keuangan Grup pada tanggal 30 September 2025. assets and liabilities as at September 30, 2025.
Biaya perolehan
Jumlah/ diamortisasi/
Total Amortized cost FVOCI
30 September 2025 September 30, 2025
Aset keuangan Financial assets
Kas dan setara kas 628.123 628.123 - Cash and cash equivalents
Kas yang dibatasi penggunaannya 487 487 - Restricted cash
Piutang usaha Trade receivables
- Pihak yang berelasi 159.344 159.344 - Related parties -
- Pihak ketiga 3.427 3.427 - Third parties -
Piutang lain-lain Other receivables
- Pihak yang berelasi 9.245 9.245 - Related parties -
- Pihak ketiga 57 57 - Third parties -
Aset keuangan yang dinilai Financial assets at
pada nilai wajar melalui fair value through other
penghasilan komprehensif lain 21.716 - 21.716 comprehensive income
Jumlah aset keuangan 822.399 800.683 21.716 Total financial assets
Tabel berikut menyajikan aset dan liabilitas The following tables set out the Group’s financial
keuangan Grup pada tanggal 31 Desember 2024. assets and liabilities as at December 31, 2024.
Biaya perolehan
Jumlah/ diamortisasi/
Total Amortized cost FVOCI
31 Desember 2024 December 31, 2024
Aset keuangan Financial assets
Kas dan setara kas 655.191 655.191 - Cash and cash equivalents
Kas yang dibatasi penggunaannya 422 422 - Restricted cash
Piutang usaha Trade receivables
- Pihak yang berelasi 124.627 124.627 - Related parties -
- Pihak ketiga 3.498 3.498 - Third parties -
Piutang lain-lain Other receivables
- Pihak yang berelasi 11.570 11.570 - Related parties -
- Pihak ketiga 98 98 - Third parties -
Aset keuangan yang dinilai Financial assets at
pada nilai wajar melalui fair value through other
penghasilan komprehensif lain 21.716 - 21.716 comprehensive income
Jumlah aset keuangan 817.122 795.406 21.716 Total financial assets
Biaya perolehan diamortisasi/
Amortized cost
30 September
(Tidak Diaudit)/
September 30 31 Desember/
(Unaudited), December 31,
2025 2024
Liabilitas keuangan Financial liabilities
Utang usaha Trade payables
- Pihak yang berelasi 872 2.234 Related parties -
- Pihak ketiga 69.410 94.561 Third parties -
Utang lain-lain Other payables
- Pihak yang berelasi 7.581 10.137 Related parties -
Utang obligasi 398.948 398.643 Bonds payable
Pinjaman jangka panjang Long-term loans
- Pihak yang berelasi 361.702 343.219 Related party -
Biaya yang masih harus dibayar 55.126 88.053 Accrued expenses
Liabilitas sewa 3.153 3.951 Lease liabilities
Jumlah liabilitas keuangan 896.792 940.798 Total financial liabilities
Page 104
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/94 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
30. MANAJEMEN RISIKO KEUANGAN 30. FINANCIAL RISK MANAGEMENT
I. Faktor risiko keuangan I. Financial risk factors
Aktivitas yang dilakukan oleh Grup dihadapkan The Group’s activities expose it to a variety of
pada berbagai risiko keuangan: risiko pasar financial risks: market risk (including currency
(termasuk risiko nilai tukar mata uang asing, risk, interest rate risk, and price risk), credit risk,
risiko tingkat bunga, dan risiko harga), risiko and liquidity risk. The objectives of the Group’s
kredit dan risiko likuiditas. Tujuan dari risk management are to identify, measure,
manajemen risiko Grup adalah untuk monitor, and manage basic risks to safeguard
mengidentifikasi, mengukur, mengawasi, dan the Group’s long-term business continuity and
mengelola risiko dasar dalam upaya melindungi minimize potential adverse effects on the
kesinambungan bisnis Grup dalam jangka Group's financial performance.
panjang dan meminimalkan dampak yang tidak
diharapkan pada kinerja keuangan Grup.
Grup menggunakan berbagai metode untuk The Group uses various methods to measure its
mengukur risiko yang dihadapinya. Metode ini exposure to risk. These methods include
meliputi analisis sensitivitas untuk risiko tingkat sensitivity analysis for interest rates, foreign
suku bunga, nilai tukar, risiko harga lainnya, exchange rates, other price risks, credit risks,
risiko kredit, dan kajian lindung nilai. and hedging assessment.
a. Risiko pasar a. Market risk
i. Risiko nilai tukar mata uang asing i. Foreign exchange risk
Pendapatan dan pengeluaran dari Grup The Group’s revenue and expenditure
sebagian besar dalam mata uang dolar are dominated in US dollar, which
Amerika Serikat yang secara tidak indirectly represents a natural hedge on
langsung merupakan lindung nilai alami exposure to the fluctuation in foreign
(natural hedging) terhadap exposure exchange rates.
fluktuasi mata uang asing.
Analisis sensitivitas Sensitivity analysis
Penguatan (pelemahan) Rupiah, Euro, A strengthening (weakening) of the
dan Yen yang diindikasikan di bawah, Rupiah, Euro, and Yen respectively as
terhadap dolar AS akan meningkatkan indicated below, against the US dollar
(menurunkan) laba-rugi setelah pajak would have increased (decreased) after-
sebesar jumlah yang ditunjukkan di tax profit or loss by the amounts shown
bawah. Analisis ini didasarkan pada below. This analysis is based on foreign
varian nilai tukar mata uang asing yang currency exchange rate variances that
Grup pertimbangkan yang sangat the Group considered to be reasonably
mungkin terjadi pada tanggal pelaporan. possible at the reporting date. The
Analisis mengasumsikan bahwa seluruh analysis assumes that all other
variabel lain, pada khususnya tingkat variables, in particular interest rates,
suku bunga, tetap tidak berubah dan remain constant and excludes any
mengabaikan dampak atas perkiraan impact of forecasted sales and
penjualan dan pembelian. purchases.
Laba/(rugi)/Profit/(loss)
Penguatan/ Pelemahan/
Strengthening Weakening
30 September 2025 September 30, 2025
Rupiah (pergerakan 3%) 1.975 (1.860) Rupiah (3% movement)
Euro (pergerakan 3%) 13 (13) Euro (3% movement)
Yen (pergerakan 3%) (3.016) 3.016 Yen (3% movement)
Page 105
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/95 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
30. MANAJEMEN RISIKO KEUANGAN (lanjutan) 30. FINANCIAL RISK MANAGEMENT (continued)
I. Faktor risiko keuangan (lanjutan) I. Financial risk factors (continued)
a. Risiko pasar (lanjutan) a. Market risk (continued)
i. Risiko nilai tukar mata uang asing i. Foreign exchange risk (continued)
(lanjutan)
Laba/(rugi)/Profit/(loss)
Penguatan/ Pelemahan/
Strengthening Weakening
31 Desember 2024 December 31, 2024
Rupiah (pergerakan 3%) 580 (546) Rupiah (3% movement)
Euro (pergerakan 3%) 10 (10) Euro (3% movement)
Yen (pergerakan 3%) (2.540) 2.540 Yen (3% movement)
ii. Risiko harga ii. Price risk
Grup tidak terekspos secara signifikan The Group is not significantly exposed to
terhadap risiko harga karena harga price risk as prices are determined under
jualnya telah ditentukan berdasarkan its sales contracts.
kontrak penjualan.
iii. Risiko suku bunga iii. Interest rate risk
Risiko tingkat suku bunga Grup timbul The Group‘s interest rate risk arises from
dari kas dan setara kas, dan pinjaman cash and cash equivalents, and long-
jangka panjang pihak yang berelasi. term loans from related parties. The
Pendapatan dan arus kas yang Group’s income and operating cash flow
diperoleh Grup dari aktivitas operasi are substantially independent of
secara substansial independen changes in market interest rates.
terhadap perubahan suku bunga pasar.
Aset dan liabilitas keuangan yang Financial assets and liabilities issued at
diterbitkan dengan suku bunga floating rates expose the Group to cash
mengambang mengekspos Grup flow interest rate risks, while those
terhadap risiko suku bunga arus kas. issued at fixed rates expose the Group
Sedangkan aset dan liabilitas keuangan to fair value interest rate risk.
yang diterbitkan dengan tingkat suku
bunga tetap mengekspos Grup terhadap
risiko nilai wajar suku bunga.
Page 106
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/96 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
30. MANAJEMEN RISIKO KEUANGAN (lanjutan) 30. FINANCIAL RISK MANAGEMENT (continued)
I. Faktor risiko keuangan (lanjutan) I. Financial risk factors (continued)
a. Risiko pasar (lanjutan) a. Market risk (continued)
iii. Risiko suku bunga (lanjutan) iii. Interest rate risk (continued)
Tabel berikut ini merupakan rincian dari The following tables represents
aset dan liabilitas keuangan yang a breakdown of the Company’s financial
dipengaruhi oleh suku bunga: assets and liabilities impacted by
interest rates:
30 September (Tidak Diaudit)/September 30 (Unaudited), 2025
Suku bunga mengambang/ Suku bunga tetap/
Floating rate Fixed rate Tidak
Kurang dari Lebih dari Kurang dari Lebih dari berbunga/
satu tahun/ satu tahun/ satu tahun/ satu tahun/ Non-
Less than More than Less than More than interest Jumlah/
one year one year one year one year bearing Total
Aset keuangan/
Financial assets
Kas dan setara kas/
Cash and cash
equivalents 628.123 - - - - 628.123
Kas yang dibatasi
penggunaannya/
Restricted cash - - 420 67 - 487
Piutang usaha/
Trade receivables - - - - 162.771 162.771
Piutang lain-lain/
Other receivables - - - - 9.302 9.302
Aset keuangan yang dinilai
pada nilai wajar
melalui pendapatan
komprehensif lain/
Financial assets at
fair value through other
comperehensive income - - - - 21.716 21.716
Jumlah aset keuangan/
Total financial assets 628.123 - 420 67 193.789 822.399
Liabilitas keuangan/
Financial liabilities
Utang usaha
Trade payables - - - - 70.282 70.282
Utang lain-lain/
Other payables - - - - 7.581 7.581
Utang Obligasi/
Bonds Payable - - - 398.948 - 398.948
Pinjaman jangka panjang/
Long-term loan 18.671 343.031 - - - 361.702
Biaya yang masih
harus dibayar/
Accrued expenses - - - - 55.126 55.126
Liabilitas sewa/
Lease liabilities 1.645 1.508 - - - 3.153
Jumlah liabilitas keuangan/
Total financial liabilities 20.316 344.539 - 398.948 132.989 896.792
Page 107
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/97 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
30. MANAJEMEN RISIKO KEUANGAN (lanjutan) 30. FINANCIAL RISK MANAGEMENT (continued)
I. Faktor risiko keuangan (lanjutan) I. Financial risk factors (continued)
a. Risiko pasar (lanjutan) a. Market risk (continued)
iii. Risiko suku bunga (lanjutan) iii. Interest rate risk (continued)
31 Desember/December 31, 2024
Suku bunga mengambang/ Suku bunga tetap/
Floating rate Fixed rate Tidak
Kurang dari Lebih dari Kurang dari Lebih dari berbunga/
satu tahun/ satu tahun/ satu tahun/ satu tahun/ Non-
Less than More than Less than More than interest Jumlah/
one year one year one year one year bearing Total
Aset keuangan/
Financial assets
Kas dan setara kas/
Cash and cash
equivalents 655.191 - - - - 655.191
Kas yang dibatasi
penggunaannya/
Restricted cash - - 237 185 - 422
Piutang usaha/
Trade receivables - - - - 128.125 128.125
Piutang lain-lain/
Other receivables - - - - 11.668 11.668
Aset keuangan yang dinilai
pada nilai wajar
melalui pendapatan
komprehensif lain/
Financial assets at
fair value through other
comperehensive income - - - - 21.716 21.716
Jumlah aset keuangan/
Total financial assets 655.191 - 237 185 161.509 817.122
Liabilitas keuangan/
Financial liabilities
Utang usaha
Trade payables - - - - 96.795 96.795
Utang lain-lain/
Other payables - - - - 10.137 10.137
Utang Obligasi/
Bonds Payable - - - 398.643 - 398.643
Pinjaman jangka panjang/
Long-term loan 15.172 328.047 - - - 343.219
Biaya yang masih
harus dibayar/
Accrued expenses - - - - 88.053 88.053
Liabilitas sewa/
Lease liabilities 1.402 2.549 - - - 3.951
Jumlah liabilitas keuangan/
Total financial liabilities 16.574 330.596 - 398.643 194.985 940.798
Perubahan 20 basis poin atas tingkat A change of 20 basis points in floating
suku bunga mengambang pada tanggal interest rates at the reporting date
pelaporan akan berpengaruh terhadap would have affected income for the year
laba tahun berjalan sebesar jumlah di by the amounts shown below. This
bawah. Analisis ini mengasumsikan analysis assumes that all other
bahwa seluruh variabel lain, terutama variables, particularly foreign currency
nilai tukar mata uang asing, tidak rates, remain constant.
berubah.
+20 bp -20bp
meningkat/increase menurun/decrease
Dampak terhadap: Effect on:
(Rugi) tahun berjalan (2.998) (2.149) (Loss) for the year
Sensitivitas arus kas (bersih) (8.817) (6.322) Cash flow sensitivity (net)
Page 108
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/98 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
30. MANAJEMEN RISIKO KEUANGAN (lanjutan) 30. FINANCIAL RISK MANAGEMENT (continued)
I. Faktor risiko keuangan (lanjutan) I. Financial risk factors (continued)
b. Risiko kredit b. Credit risk
Pada tanggal 30 September 2025 dan 31 As of September 30, 2025, and December
Desember 2024, jumlah maksimum 31, 2024, the total maximum exposure to
eksposur dari risiko kredit adalah credit risk was US$628,123 and
US$628.123 dan US$655.191, yang US$655,191, which involves cash in banks.
berasal dari penempatan dana pada bank. All the cash in banks is placed at state-
Semua penempatan dana ditempatkan owned banks with AA+ and AAA ratings.
pada bank milik Pemerintah yang
mendapatkan peringkat AA+ dan AAA.
Grup tidak terekspos secara signifikan The Group is not significantly exposed to
terhadap risiko kredit dari piutang, karena credit risk as its primary customers for
pembeli utama adalah PLN dan PT PLN steam and electricity are PLN and PT PLN
Indonesia Power yang selama ini memiliki Indonesia Power, which have good
reputasi yang baik dan secara historis reputations and historically have always
selalu membayar utang mereka kepada paid their debts to the Group. PLN and PT
Grup. PLN dan PT PLN Indonesia Power PLN Indonesia Power are rated by external
memperoleh peringkat AAA dari credit ratings PT Pemeringkat Efek
pemeringkat eksternal PT Pemeringkat Indonesia.
Efek Indonesia.
c. Risiko likuiditas c. Liquidity risk
Risiko likuiditas merupakan risiko yang Liquidity risk is defined as a risk that arises
muncul dalam situasi di mana posisi arus in situations where the Group’s cash flow
kas Grup mengindikasikan bahwa arus kas indicates that the cash inflow from short-
masuk dari pendapatan jangka pendek term revenue is not enough to cover the
tidak cukup untuk memenuhi arus kas cash outflow of short-term expenditures.
keluar untuk pengeluaran jangka pendek.
Pada tanggal 30 September 2025, Grup On September 30, 2025, the Group has
memiliki saldo modal kerja positif senilai positif working capital position amounting to
US$650.926. US$650,926.
Berdasarkan kondisi yang diungkapkan di Based on conditions as disclosed above,
atas, Manajemen berkeyakinan bahwa Management believes that the Group will be
Grup akan mampu melanjutkan sebagai able to continue as a going concern entity.
entitas yang memiliki keberlangsungan
usaha.
Page 109
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/99 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
30. MANAJEMEN RISIKO KEUANGAN (lanjutan) 30. FINANCIAL RISK MANAGEMENT (continued)
I. Faktor risiko keuangan (lanjutan) I. Financial risk factors (continued)
c. Risiko likuiditas (lanjutan) c. Liquidity risk (continued)
Tabel di bawah ini menggambarkan The table below analyses the Group’s
liabilitas keuangan Grup pada tanggal financial liabilities at September 30, 2025,
30 September 2025 dan 31 Desember 2024 and December 31, 2024, grouped according
berdasarkan jatuh temponya yang relevan to maturity based on the remaining period to
berdasarkan periode sisa hingga tanggal the contractual maturity date. The amounts
jatuh tempo kontraktual. Jumlah yang disclosed in the table are contractual
diungkapkan dalam tabel ini adalah nilai undiscounted cash flows:
arus kas kontraktual yang tidak terdiskonto:
30 September (Tidak Diaudit)/September 30 (Unaudited), 2025
Kurang dari Lebih dari
1 tahun/ 5 tahun/
Less than 1-5 tahun/ Later than
1 year 1-5 years 5 years Total
Liabilitas Liabilities
Utang usaha 70.282 - - 70.282 Trade payables
Utang lain-lain 7.581 - - 7.581 Other payables
Utang obligasi - 398.948 - 398.948 Bonds payable
Pinjaman jangka
panjang 18.671 65.643 277.388 361.702 Long-term loans
Biaya yang masih
harus dibayar 55.126 - - 55.126 Accrued expenses
Liabilitas sewa 1.645 1.508 - 3.153 Lease liabilities
Jumlah 153.305 466.099 277.388 896.792 Total
31 Desember/December 31, 2024
Kurang dari Lebih dari
1 tahun/ 5 tahun/
Less than 1-5 tahun/ Later than
1 year 1-5 years 5 years Total
Liabilitas Liabilities
Utang usaha 96.795 - - 96.795 Trade payables
Utang lain-lain 10.137 - - 10.137 Other payables
Utang obligasi - 398.643 - 398.643 Bonds payable
Pinjaman jangka
panjang 15.172 64.444 263.603 343.219 Long-term loans
Biaya yang masih
harus dibayar 88.053 - - 88.053 Accrued expenses
Liabilitas sewa 1.402 2.549 - 3.951 Lease liabilities
Jumlah 211.559 465.636 263.603 940.798 Total
Page 110
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/100 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
30. MANAJEMEN RISIKO KEUANGAN (lanjutan) 30. FINANCIAL RISK MANAGEMENT (continued)
II. Estimasi nilai wajar II. Fair value estimation
Tabel di bawah ini menganalisis instrumen The table below analyses financial instruments
keuangan yang dicatat pada nilai wajar carried at fair value, by level of valuation method.
berdasarkan tingkatan metode penilaian. The different levels of valuation methods have
Perbedaan pada setiap tingkatan metode been defined as follows:
penilaian dijelaskan sebagai berikut:
• Harga dikutip (tidak disesuaikan) dari pasar • Quoted prices (unadjusted) in active markets
yang aktif untuk aset atau liabilitas yang identik for identical assets or liabilities (Level 1);
(Tingkat 1);
• Input selain harga yang dikutip dari pasar yang • Inputs other than quoted prices included within
disertakan pada Tingkat 1 yang dapat Level 1 that are observable for the asset or
diobservasi untuk aset dan liabilitas, baik liability, either directly (that is, as prices) or
secara langsung (yaitu sebagai sebuah harga) indirectly (that is, derived from prices) (Level
atau secara tidak langsung (yaitu sebagai 2); and
turunan dari harga) (Tingkat 2); dan
• Input untuk aset atau liabilitas yang tidak • Inputs for the asset or liability that are not
didasarkan pada data pasar yang dapat based on observable market data (that is,
diobservasi (informasi yang tidak dapat unobservable inputs) (Level 3).
diobservasi) (Tingkat 3).
Tabel berikut menyajikan aset dan liabilitas The following table presents the Group’s
keuangan Grup yang diukur sebesar nilai wajar financial assets and liabilities that are measured
pada 30 September 2025: at fair value on September 30, 2025:
Tingkat 1/ Tingkat 2/ Tingkat 3/ Jumlah/
Level 1 Level 2 Level 3 Total
Aset keuangan yang
diukur pada nilai Financial assets
wajar melalui penghasilan at fair value through other
komprehensif lain comprehensive income
Instrumen ekuitas - 21.716 - - Equity instrument
Jumlah - 21.716 - - Total
Manajemen berpendapat bahwa nilai tercatat Management considers the carrying values of its
dari aset dan liabilitas keuangan berikut: financial assets and liabilities such as:
- kas dan setara kas - cash and cash equivalents
- kas yang dibatasi penggunaannya - restricted cash
- piutang usaha - trade receivables
- piutang lain-lain - other receivables
- utang usaha - trade payables
- utang lain-lain - other payables
- utang obligasi - bonds payable
- pinjaman jangka panjang - long term loan
- biaya yang masih harus dibayar - accrued expenses
mendekati nilai wajarnya pada 30 September approximate their fair values as at
2025. Nilai wajar instrumen ekuitas berdasarkan September 30, 2025. The fair values of equity
metode arus kas diskonto. instrument are calculated by applying the
discounted cash flow methods.
Page 111
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/101 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
30. MANAJEMEN RISIKO KEUANGAN (lanjutan) 30. FINANCIAL RISK MANAGEMENT (continued)
III. Manajemen risiko permodalan III. Capital risk management
Tujuan Grup dalam pengelolaan modal adalah The Group’s objectives when managing capital
untuk mempertahankan kelangsungan usaha are to safeguard the Group’s ability to continue
Grup guna memberikan imbal hasil kepada as a going concern in order to provide returns for
pemegang saham dan manfaat kepada shareholders and benefits to other stakeholders
pemangku kepentingan lainnya serta menjaga and to maintain an optimum capital structure
struktur modal yang optimal yang meliputi utang covering debt and equity to minimize the cost of
dan ekuitas untuk mengurangi biaya modal. capital.
Secara periodik, Grup melakukan penilaian Periodically, the Group conducts debt valuation
utang untuk menilai kemungkinan pembiayaan to assess possibilities of refinancing existing
kembali utang yang ada dengan utang baru debts with new ones which have more efficient
yang memiliki biaya yang lebih efisien sehingga cost that will lead to more optimized cost-of-debt.
mengoptimalkan biaya utang.
Grup dipersyaratkan oleh Undang-undang No. The Group is required by the Limited Liability
40 tahun 2007 tentang Perseroan Terbatas Company Law No. 40 of 2007 to allocate and
untuk mengalokasikan dana cadangan yang maintain a non-distributable reserve fund until
tidak boleh didistribusikan sampai dengan 20% such reserve reaches 20% of the issued and fully
dari modal saham ditempatkan dan disetor paid capital stock. This externally imposed
penuh. Persyaratan permodalan eksternal capital requirement is considered by the Group
tersebut dipertimbangkan oleh Grup dalam in the General Meeting of Shareholders.
Rapat Umum Pemegang Saham.
Permodalan Grup antara lain berasal dari The financing of Group comes from equity and
ekuitas dan pinjaman yang diberikan oleh loans provided by Pertamina, and bonds
Pertamina, serta utang obligasi. payable.
Page 112
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/102 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
31. PERJANJIAN, KOMITMEN, DAN KONTINJENSI 31. SIGNIFICANT AGREEMENTS, COMMITMENTS
SIGNIFIKAN AND CONTINGENCIES
a. Perjanjian-perjanjian a. Agreements
Berikut adalah kesepakatan kemitraan Grup As at September 30, 2025, the Group’s
pada tanggal 30 September 2025: partnership arrangements are as follows:
Tanggal Kontrak/ Berakhirnya Kontrak/ Jenis Kontrak/ Lokasi/
Para Pihak/Parties Contract Date End of Contract Type of Contract Location
● PT Pertamina Geothermal 31 Januari/January 31 Desember/December PJBU Unit 1, 2 Kamojang,
Energy (dahulu/formerly 1992 (diubah 2040 dan 3/SSC Units Jawa Barat/
PERTAMINA) pada tanggal 1, 2 West Java
● PT PLN Indonesia Power 11 Februari 2016/ and 3
(dahulu/formerly PT PLN amended on
(Persero)) February 11, 2016)
● PT Pertamina Geothermal 26 Januari/January 360 bulan sejak tanggal PJBL Unit 4/ Kamojang,
Energy (dahulu/formerly 2004 (diubah pada operasi komersial (COD) ESC Unit 4 Jawa Barat/
PERTAMINA) tanggal 11 Februari (26 Januari 2008)/ West Java
● PT PLN (Persero) 2016/amended on 360 months from
February 11, 2016) Commercial Operation Date
(COD) (January 26, 2008)
● PT Pertamina Geothermal 12 Mei/May 1999 30 tahun sejak COD PJBU Unit 1/SSC Lahendong,
Energy (dahulu/formerly (diubah pada tanggal (21 Agustus 2001) / Unit 1 Sulawesi Utara/
PERTAMINA) 11 Februari 2016/ 30 years from COD North Sulawesi
● PT PLN (Persero) *) amended on (August 21, 2001)
February 11, 2016)
● PT Pertamina Geothermal 2 Agustus/August 2004 30 tahun sejak COD unit PJBU Unit 2 dan Lahendong,
Energy (dahulu/formerly (diubah pada tanggal terakhir (Unit 3) (7 April 3/ Sulawesi Utara/
PERTAMINA) 11 Februari 2009)/ SSC Units 2 and North Sulawesi
● PT PLN (Persero) *) 2016/amended on 30 years from COD of the 3
February 11, 2016) last unit (Unit 3) (April 7,
2009)
● PT Pertamina Geothermal 15 Januari/January 480 bulan sejak tanggal PJBU/SSC Sibayak,
Energy (dahulu/formerly 1996 (diubah Efektif yang dicantumkan Sumatera Utara/
PERTAMINA) pada tanggal dalam Amendmen SSC North Sumatera
● PT Dizamatra Powerindo 8 Desember 2003/ tertanggal 8 Desember
amended on 2003/
December 8, 2003) 480 months from the
Effective date as stated in
the SSC Amendment dated
December 8, 2003
● PT Pertamina Geothermal 16 November 1994 30 November 2040 KOB/JOC Salak,
Energy (dahulu/formerly (diubah pada tanggal Jawa Barat/
PERTAMINA) 22 Juli 2002/ West Java
● Chevron Geothermal Salak, amended on
Ltd. (dahulu/formerly Unocal July 22, 2002)
Geothermal Indonesia Ltd.)
● Dayabumi Salak Pratama
Ltd.
● PT Pertamina Geothermal 16 November 1994 30 November 2040 PJBL/ESC Salak,
Energy (dahulu/formerly (diubah pada tanggal Jawa Barat/
PERTAMINA) 22 Juli 2002/ West Java
● PT PLN (Persero) amended on
● Chevron Geothermal Salak July 22, 2002)
Ltd. (dahulu/formerly Unocal
Geothermal Indonesia Lt d.)
● Dayabumi Salak Pratama
Ltd.
Page 113
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/103 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
31. PERJANJIAN, KOMITMEN, DAN KONTINJENSI 31. SIGNIFICANT AGREEMENTS, COMMITMENTS
SIGNIFIKAN (lanjutan) AND CONTINGENCIES (continued)
a. Perjanjian-perjanjian (lanjutan) a. Agreements (continued)
Tanggal Kontrak/ Berakhirnya Kontrak/ Jenis Kontrak/ Lokasi/
Para Pihak/Parties Contract Date End of Contract Type of Contract Location
● PT Pertamina Geothermal 15 Januari/January 684 bulan sejak tanggal KOB/JOC Darajat,
Energy (dahulu/formerly 1996 (diubah pada efektif berlakunya perjanjian Jawa Barat/
PERTAMINA) tanggal (16 November 1984) West Java
● Chevron Geothermal 7 Februari 2003/ (SEGD telah notice ke PGE
Indonesia Ltd. amended on tanggal 22 September 2020
(dahulu/formerly Texaco February 7, 2003) mengenai perpanjangan
Darajat Ltd.) otomatis JOC) /
● PT Darajat Geothermal 684 months commencing
Indonesia on the effective date
(November 16,1984) SEGD
has Noticed PGE dated
September 22, 2020 about
Automatic Extention JOC
Period))
● PT Pertamina Geothermal 15 Januari/January 552 bulan sejak tanggal PJBL/ESC Darajat,
Energy (dahulu/formerly 1996 (diubah pada efektif berlakunya perjanjian Jawa Barat/
PERTAMINA) tanggal 1 Mei 2000/ (15 Januari 1996) (SEGD West Java
● PT PLN (Persero) amended on telah notice ke PLN tanggal
● Chevron Geothermal May 1, 2000) 22 September 2020
Indonesia Ltd. mengenai perpanjangan
(dahulu/formerly Texaco otomatis ESC /
Darajat Ltd.) 552 months after the
● PT Darajat Geothermal effective date (January 15,
Indonesia 1996) SEGD has Noticed
PLN dated September 22,
2020 about Automatic
Extention ESC Period)
● PT Pertamina Geothermal 27 Februari/ February 26 Agustus/August 2048 KOB/JOC Sarulla,
Energy (dahulu/formerly 1993 (amandemen Sumatera Utara/
PERTAMINA) kedua pada tanggal 4 North Sumatera
● PT Medco Geopower April 2013/second
Sarulla amendment on April 4,
● Orsarulla Inc. 2013)
● Sarulla Power Asset Ltd.
● Kyuden Sarulla Pte. Ltd.
● Sarulla Operations Ltd.
● PT Pertamina Geothermal 27 Februari/ February 26 Agustus/August 2048 PJBL/ESC Sarulla,
Energy (dahulu/formerly 1993 Sumatera Utara/
PERTAMINA) (amandemen kedua North Sumatera
● PT PLN (Persero) dialihkan pada tanggal 4 April
dari/transferred from Unocal 2013/(second
North Sumatera Geothermal amendment on April 4,
Ltd. 2013)
● PT Medco Geopower
Sarulla
● Orsarulla Inc.
● Sarulla Power Asset Ltd.
● Kyuden Sarulla Pte. Ltd.
● Sarulla Operations Ltd.
● PT Pertamina Geothermal 17 November 1995 Berakhir pada 31 KOB/JOC Bedugul,
Energy (dahulu/formerly (diubah pada tanggal Desember 2040/ Bali
PERTAMINA) 10 Februari 2004/ Expired on December 31,
Bali Energy Ltd. amended on 2040
February 10, 2004)
Page 114
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/104 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
31. PERJANJIAN, KOMITMEN, DAN KONTINJENSI 31. SIGNIFICANT AGREEMENTS, COMMITMENTS
SIGNIFIKAN (lanjutan) AND CONTINGENCIES (continued)
a. Perjanjian-perjanjian (lanjutan) a. Agreements (continued)
Tanggal Kontrak/ Berakhirnya Kontrak/ Jenis Kontrak/ Lokasi/
Para Pihak/Parties Contract Date End of Contract Type of Contract Location
● PT Pertamina Geothermal 17 November 1995 Berakhir pada 31 Desember PJBL/ESC Bedugul,
Energy (dahulu/formerly (diubah pada tanggal 2040/ Bali
PERTAMINA) 10 Februari Expires on December 31,
● Bali Energy Ltd. PT PLN 2004/amended on 2040
(Persero) February 10, 2004)
● PT Pertamina Geothermal 2 Desember/ 504 bulan sejak KOB/JOC Wayang Windu,
Energy (dahulu/formerly December 1994 2 Desember 1994/ Jawa Barat/
PERTAMINA) (amandemen kedua 504 months from West Java
● Star Energy Geothermal pada tanggal 21 December 2, 1994
(Wayang Windu) Ltd. September
(dahulu/formerly Magma 2016/second
Nusantara Ltd.) amendment on
September 21, 2016)
● PT Pertamina Geothermal 2 Desember/December 504 bulan sejak PJBL/ESC Wayang Windu,
Energy (dahulu/formerly 1994 (amandemen 2 Desember 1994/ Jawa Barat/
PERTAMINA) kedua pada tanggal 27 504 months from West Java
● PT PLN (Persero) September December 2, 1994
● Star Energy Geothermal 2016/second
(Wayang Windu) Ltd. amendment on
(dahulu/formerly Magma September 27, 2016)
Nusantara Ltd.)
● PT Pertamina Geothermal 17 Februari/ 30 tahun sejak COD PJBU Unit 1 Ulubelu,
Energy February 2010 Unit 2 (23 Oktober 2012)/ dan 2/ Lampung
● PT PLN (Persero) *) 30 years from COD SSC Units 1
Unit 2 (October 23, 2012) and 2
● PT Pertamina Geothermal 26 April 2010 (diubah 30 tahun sejak COD PJBU Unit 4/ Lahendong,
Energy pada tanggal 11 (23 Desember 2011)/ SSC Unit 4 Sulawesi Utara/
● PT PLN (Persero) *) Februari 30 years from COD North Sulawesi
2016/amended on (December 23, 2011)
February 11, 2016)
● PT Pertamina Geothermal 26 April 2010 30 tahun sejak COD PJBU/SSC Hululais,
Energy (diubah pada tanggal Unit 2/ Bengkulu
● PT PLN (Persero) 10 Agustus 30 years from COD
2016/amended on 10 Unit 2
August 2016)
● PT Pertamina Geothermal 26 April 2010 30 tahun sejak COD PJBU/SSC Sungai Penuh,
Energy Unit 2/ Jambi
● PT PLN (Persero) 30 years from COD
Unit 2
● PT Pertamina Geothermal 11 Maret/ 360 bulan sejak COD PJBL Unit 5/ Kamojang,
Energy March 2011 (29 September 2015)/ ESC Unit 5 Jawa Barat/
PT PLN (Persero) (diubah pada tanggal 360 months from COD West Java
11 Februari 2016/ (September 29, 2015)
amended on
February 11, 2016)
● PT Pertamina Geothermal 11 Maret/ 360 bulan sejak COD PJBL/ESC Karaha,
Energy March 2011 (6 April 2018)/ Jawa Barat/
PT PLN (Persero) 360 months from COD West Java
(April 6, 2018)
Page 115
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/105 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
31. PERJANJIAN, KOMITMEN, DAN KONTINJENSI 31. SIGNIFICANT AGREEMENTS, COMMITMENTS
SIGNIFIKAN (lanjutan) AND CONTINGENCIES (continued)
a. Perjanjian-perjanjian (lanjutan) a. Agreements (continued)
Tanggal Kontrak/ Berakhirnya Kontrak/ Jenis Kontrak/ Lokasi/
Para Pihak/Parties Contract Date End of Contract Type of Contract Location
● PT Pertamina Geothermal 11 Maret/ 360 bulan sejak unit terakhir PJBL Unit 1,2,3 Lumut Balai,
Energy March 2011 beroperasi/ dan 4/ Sumatera
● PT PLN (Persero) 360 months from the ESC Units 1,2,3 Selatan/
commencement of and 4 South Sumatera
operation of the last unit
● PT Pertamina Geothermal 11 Maret/ 360 bulan sejak unit terakhir PJBL Unit 5 dan Lahendong,
Energy March 2011 beroperasi (Unit VI) (9 6/ ESC Units 5 Sulawesi Utara/
● PT PLN (Persero) (diubah pada tanggal Desember 2016)/ and 6 North Sulawesi
10 Agustus 360 months from the
2016/amended on commencement of
August 10, 2016) operation of the last unit
(Unit VI) (December 9,
2016)
● PT Pertamina Geothermal 11 Maret/ 360 bulan sejak unit terakhir PJBL Unit 3 dan Ulubelu,
Energy March 2011 beroperasi (Unit IV) (25 4/ Lampung
● PT PLN (Persero) Maret 2017)/ ESC Units 3 and
360 months from the 4
commencement of
operation of the last unit
(Unit IV) (March 25, 2017)
● PT Pertamina Geothermal 10 November/ 29 Desember/ EPCC Unit 2 Lumut Balai,
Energy November 2022 December 2025 Sumatera
● Mitsubishi Corporation Selatan/
● PT Wijaya Karya South Sumatera
● SEPCOIII Electric Power
Construction Co., Ltd
● PT Pertamina Geothermal 4 Januari/ Akan terus berlaku sampai Shareholders Way Ratai,
Energy January 2024 diakhiri karena salah satu Agreement Lampung
● Chevron New Energies dari keadaan-keadaan yg
Holdings Indonesia Ltd. disepakati dalam Perjanjian/
PT Cahaya Anagata Energy Will continue in effect until
terminated due to one of the
conditions agreed in the
Agreement
*) Mengacu surat PLN Nomor 76572/EPI.02.02/F01030000/2023, terdapat pemisahan tidak murni (spin-off) yang dilakukan oleh PLN
menyebabkan Perjanjian Uap PGE beralih karena hukum (aktiva dan pasiva) kepada PLN Indonesia Power sebagai Sub-Holding
penerima peralihan sejak tanggal 2 November 2023/referring to PLN Letter Number 76572/EPI.02.02/F01030000/2023, there has been a
partial spin-off conducted by PLN, resulting in the transfer of the PGE Steam Agreement by operation of law (assets and liabilities) to PL N
Indonesia Power as the receiving sub-holding entity, effective from November 2, 2023.
Page 116
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/106 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
31. PERJANJIAN, KOMITMEN, DAN KONTINJENSI 31. SIGNIFICANT AGREEMENTS, COMMITMENTS
SIGNIFIKAN (lanjutan) AND CONTINGENCIES (continued)
b. Perjanjian pinjaman dengan Pertamina b. Loan arrangements with Pertamina
Pada tanggal 9 November 2012, Perusahaan On November 9, 2012, the Company entered
menandatangani perjanjian pinjaman dengan into a loan arrangement with Pertamina. The
Pertamina. Perjanjian ini berlaku efektif per loan arrangement is effective from
tanggal 1 Januari 2012. Pinjaman ini diberikan January 1, 2012. The loans are provided to
untuk membiayai proyek-proyek Perusahaan, finance the Company’s capital projects, both
baik aktivitas eksplorasi dan pengembangan exploration and development projects.
proyek panas bumi.
Perjanjian pinjaman khusus Specific loan agreements
Perjanjian pinjaman khusus ini merupakan These specific loan agreements represent
pendanaan dari pihak ketiga yang digunakan funding from third parties which is used to
untuk membiayai proyek-proyek panas bumi support specific geothermal projects, whereby
tertentu dimana peminjam diwajibkan untuk the borrower is required to fulfill the covenants
memenuhi ketentuan-ketentuan yang telah set out in the agreements in exchange for the
dicantumkan dalam perjanjian tersebut sebagai low interest rates. These loan agreements are
pengganti suku bunga yang rendah. Perjanjian entered into under a Government-to-
pinjaman ini menggunakan skema Government Government scheme (“G to G”). The Indonesian
to Government (“G to G”). Pemerintah Indonesia Government makes the funding available to
akan meneruskan pendanaan tersebut kepada Pertamina, and Pertamina in turn makes this
Pertamina, dan Pertamina meneruskan funding available to the Company, with
pendanaan ini ke Perusahaan dimana Pertamina acting as the Executing Agency and
Pertamina sebagai Executing Agency dan the Company acting as the Implementing
Perusahaan sebagai Implementing Agency. Agency. These specific loan agreements
Perjanjian pinjaman khusus ini terdiri dari: comprise of:
Pendanaan oleh Japan International Japan International Cooperation Agency
Cooperation Agency (“JICA”) (“JICA”) Funding
Pemerintah Indonesia dan JICA telah The Indonesian Government (the Government)
menandatangani Perjanjian Pinjaman IP-557 and JICA have signed Loan Agreement IP-557
untuk pembiayaan atas Lumut Balai Geothermal for financing the Lumut Balai Geothermal Power
Power Plant Project dengan jumlah pendanaan Plant Project with a maximum facility of ¥26,966
maksimum sebesar ¥26.966 juta atau setara million, equivalent to US$179.539, available for
dengan US$179.539 untuk jangka waktu drawdown for a period of up to eight years from
penarikan selama delapan tahun sejak tanggal the effective date. The Government agreed to
efektif. Pemerintah telah menyetujui untuk make the funding from JICA available to
meneruskan pendanaan JICA kepada Pertamina, and Pertamina in turn makes such
Pertamina, dan Pertamina meneruskan funding available to the Company under
pendanaan ini ke Perusahaan melalui perjanjian agreement No.148/PGE000/2013-S0.
No.148/PGE000/2013-S0.
Pada tanggal 30 Oktober 2023, melalui surat ref. On 30 October 2023, through letter ref. no:
no: S-677/PR.2/2023, Pemerintah menyetujui S-677/PR.2/2023, the Government agreed the
amandemen batas waktu penarikan pinjaman amendment of the loan drawdown deadline of
Loan Agreement JICA IP-557 Lumut Balai JICA Loan Agreement IP-557 Lumut Balai
Geothermal Power Plant Project menjadi Geothermal Power Plant Project to be before
sebelum tanggal 31 Desember 2026. Kemudian December 31, 2026. After that, on 6 September
pada tanggal 6 September 2024. Melalui surat 2024, through letter ref no. S-220/PB.4/2024, the
ref no. S-220/PB.4/2024 Pemerintah menyetujui Government agreed to the amendment of
amandemen realokasi senilai JPY 252.000.000 reallocating amount of JPY 252.000.000 to
ke plafon layanan konsultan. consulting service tranche.
Page 117
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/107 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
31. PERJANJIAN, KOMITMEN, DAN KONTINJENSI 31. SIGNIFICANT AGREEMENTS, COMMITMENTS
SIGNIFIKAN (lanjutan) AND CONTINGENCIES (continued)
b. Perjanjian pinjaman dengan Pertamina b. Loan arrangements with Pertamina
(lanjutan) (continued)
Perjanjian pinjaman khusus (lanjutan) Specific loan agreements (continued)
Pendanaan oleh Japan International Japan International Cooperation Agency
Cooperation Agency (“JICA”) (lanjutan) (“JICA”) Funding (continued)
Pelunasan pokok pinjaman akan dilakukan The repayments of the loan principal shall be
setiap setengah tahunan setiap tanggal settled on a semester basis on
20 April dan 20 Oktober untuk periode sebelum April 20 and October 20, in respect to amounts
tanggal terakhir penarikan pinjaman, dan setiap drawn drown before the end of the loan
tanggal 20 Maret dan 20 September untuk drawdown period, and on
periode setelah tanggal terakhir penarikan March 20 and September 20, effective after the
pinjaman. Pembayarannya disepakati untuk end of the loan drawdown period. It has been
dimulai dari tahun 2021 hingga tahun 2051. agreed that loan repayments will be made
Perusahaan wajib untuk membayar bunga atas starting in 2021 and ending in 2051. The
pokok pinjaman sebesar: Company is required to pay interest on the loan
principal as follows:
● Atas kategori pekerjaan sipil dan pengadaan ● For civil engineering and procurement of
peralatan batas pinjaman sampai dengan equipment for drawdown amounts of
¥25.327 juta atau setara dengan ¥25,327 million, or equal to US$175,824,
US$175.824 dikenakan bunga sebesar interest applies at the rate of 0.3% p.a. plus
0,3% ditambah 0,3% per tahun. 0.3% p.a.
● Atas kategori jasa konsultan batas pinjaman ● For consultation services for drawdown
sampai dengan ¥1.639 juta atau setara amounts up to ¥1,639 million, or equal to
dengan US$11.378 dikenakan bunga US$11,378, interest applies at the rate of
sebesar 0,01% ditambah 0,01% per tahun. 0.01% p.a. plus 0.01% p.a.
Perusahaan mulai menggunakan pinjaman The Company utilized the loan starting in March
tersebut sejak Maret 2012. Jumlah penggunaan 2012. The total loan facility drawn down as of
dana pinjaman tersebut pada tanggal 30 September 30, 2025, was ¥26,233 million or
September 2025 adalah sebesar ¥26.233 juta equivalent to US$176,432. The outstanding
atau setara dengan US$176.432. Jumlah amount as of September 30, 2025, was ¥22,254
pinjaman yang masih belum dibayarkan pada 30 million or equivalent to US$149,674.
September 2025 adalah sebesar ¥22.254 juta
atau setara dengan US$149.674.
Page 118
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/108 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
31. PERJANJIAN, KOMITMEN, DAN KONTINJENSI 31. SIGNIFICANT AGREEMENTS, COMMITMENTS
SIGNIFIKAN (lanjutan) AND CONTINGENCIES (continued)
b. Perjanjian pinjaman dengan Pertamina b. Loan arrangements with Pertamina
(lanjutan) (continued)
Perjanjian pinjaman khusus (lanjutan) Specific loan agreements (continued)
Pendanaan Bank Internasional untuk International Bank for Reconstruction and
Rekonstruksi dan Pembangunan (“IBRD”) Development (“IBRD”) Funding
Pemerintah Indonesia dengan IBRD telah The Indonesian Government (the Government)
menandatangani Perjanjian Pinjaman IBRD No. and the IBRD have signed Loan Agreement
8082-ID dengan total pendanaan sebesar IBRD No. 8082-ID involving total funding of
US$175.000 dan Perjanjian Pinjaman Clean US$175,000 and a Clean Technology Fund
Technology Fund (“CTF”) No. TF 10407-ID (“CTF”) Loan Agreement No. TF 10407-ID
dengan total pendanaan sebesar US$125.000. involving total funding of US$125,000. The loan
Jangka waktu penarikan pinjaman tersebut drawdown terms expire on December 31, 2019.
berakhir pada 31 Desember 2019.
Pemerintah telah menyetujui untuk meneruskan The Government agreed to make the funding
pendanaan dari IBRD kepada Pertamina, dan obtained from the IBRD to Pertamina, and
Pertamina meneruskan pendanaan ini ke Pertamina has in turn made such funding
Perusahaan melalui perjanjian No. available to the Company under agreement No.
149/PGE000/2013-S0 beserta adendum dan 149/PGE000/2013-S0 and its addendum and
No. 150/PGE000/2013-S0 beserta adendum. No. 150/PGE000/2013-S0 and its addendum.
Pendanaan tersebut dipergunakan dalam The funding is to be used for the financing of
rangka pembiayaan Geothermal Clean Energy Geothermal Clean Energy Investment Projects
Investment Project development untuk Ulubelu involving the development of the Ulubelu Units 3
Unit 3 dan 4 dan Lahendong Unit 5 dan 6. and 4 and Lahendong Units 5 and 6.
Pelunasan pokok pinjaman akan dilakukan The loan principal repayments shall be settled
setiap setengah tahunan setiap tanggal on a semester basis every April 10 and October
10 April dan 10 Oktober, dimana: 10, as follows:
● Pelunasan atas pendanaan IBRD sebesar ● Repayments of the IBRD US$175,000
US$175.000 dimulai tanggal 10 Oktober funding facility are due to commence on
2020 sampai dengan 10 Oktober 2035. October 10, 2020, and end on
Beban bunga yang dikenakan atas October 10, 2035. Interest charged under
perjanjian pinjaman ini adalah Secured this financing arrangement shall be at the
Overnight Financing Rate (“SOFR”) Secured Overnight Financing Rate
ditambah variable spread ditambah 0,45% (“SOFR”) plus variable spread plus 0.45%
per tahun. p.a.
● Pelunasan atas fasilitas pendanaan CTF ● Repayments of the CTF funding facility are
dimulai tanggal 10 Oktober 2021 sampai 10 due to commence on October 10, 2021, and
April 2051. Beban bunga yang dikenakan end on April 10, 2051. Interest charged
atas perjanjian pinjaman CTF adalah 0,25% under the CTF financing arrangement shall
per tahun ditambah 0,25% per tahun. be at the rate of 0.25% p.a. plus 0.25% p.a.
Page 119
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/109 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
31. PERJANJIAN, KOMITMEN, DAN KONTINJENSI 31. SIGNIFICANT AGREEMENTS, COMMITMENTS
SIGNIFIKAN (lanjutan) AND CONTINGENCIES (continued)
b. Perjanjian pinjaman dengan Pertamina b. Loan arrangements with Pertamina
(lanjutan) (continued)
Perjanjian pinjaman khusus (lanjutan) Specific loan agreements (continued)
Pendanaan Bank Internasional untuk International Bank for Reconstruction and
Rekonstruksi dan Pembangunan (“IBRD”) Development (“IBRD”) Funding (continued)
(lanjutan)
Perusahaan mulai menggunakan fasilitas The Company started to utilize the IBRD facility
pinjaman IBRD dan CTF pada bulan Oktober and the CTF loan facility in October 2014. The
2014. Total penggunaan dana pinjaman untuk total loan facilities drawdown as of September
tahun yang berakhir pada tanggal 30 September 30, 2025, were US$129,044 under the IBRD
2025 adalah sebesar US$129.044 untuk facility and US$124,311 under the CTF facility.
fasilitas IBRD dan US$124.311 untuk fasilitas The total outstanding loan as of September 30,
CTF. Jumlah pinjaman yang masih belum 2025, were US$97,661 under the IBRD facility
dibayarkan pada 30 September 2025 adalah and US$114,366 under the CTF facility.
US$97.661 untuk fasilitas IBRD dan
US$114.366 untuk fasilitas CTF.
c. Kontinjensi c. Contingencies
Pemulihan Lokasi Pasca Operasi Site Recovery After Operation
Dalam industri hulu minyak dan gas bumi, In the oil and gas industry, the contractors of the
kontraktor kontrak kerja sama mempunyai cooperative contract have a legal obligation to
kewajiban hukum untuk mencadangkan dana make provision related to post-operation
terkait kegiatan pemulihan pasca operasi recovery (Abandonment Site Restoration
(Abandonment Site Restoration (“ASR”)) yang (“ASR”)) also known as restoration
disebut dengan kewajiban restorasi/pemulihan obligation/recovery of operating area, which
area operasi, yang diantaranya terdiri dari consists of demolition, displacement, as well as
kegiatan pembongkaran, pemindahan, serta site restoration at the end of the contract.
pemulihan lokasi saat berakhirnya kontrak
kerjasama.
Berdasarkan UU No. 21 Tahun 2014, UU No. 11 Based on Law no. 21 of 2014, Law No. 11 of
Tahun 2020, PP No. 22 Tahun 2021 serta PP 2020, Government regulation No. 22 of 2021 and
No. 25 Tahun 2021, Perusahaan mempunyai Government regulation No. 25 of 2021, the
kewajiban untuk melakukan pemulihan Company has an obligation to perform site
lingkungan (site restoration) pada saat Izin restoration when the Geothermal Permit expires
Panas Bumi berakhir atau dikembalikan. Selain or is returned. Furthermore, the Company is
itu, Perusahaan diwajibkan untuk required to reserve site restoration fund.
mencadangkan dana pemulihan lingkungan.
Page 120
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/110 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
31. PERJANJIAN, KOMITMEN, DAN KONTINJENSI 31. SIGNIFICANT AGREEMENTS, COMMITMENTS
SIGNIFIKAN (lanjutan) AND CONTINGENCIES (continued)
c. Kontinjensi (lanjutan) c. Contingencies (continued)
Pemulihan Lokasi Pasca Operasi (lanjutan) Site Recovery After Operation (continued)
Namun, dengan mempertimbangkan bahwa However, considering that up to date there is no
sampai saat ini belum terdapat peraturan law regulating the deposit mechanisms,
perundang-undangan yang mengatur calculation, as well as the amount stipulation of
mekanisme penyetoran, tata cara perhitungan the ASR for the Geothermal Permit holder,
serta penetapan besaran dana yang mengatur therefore, management believe that there is no
ASR tersebut pada pemegang izin panas bumi, provision for ASR.
maka manajemen meyakini bahwa tidak
terdapat provisi yang dicadangkan atas
kewajiban ASR tersebut.
Atas pengembalian wilayah kerja Gunung Lawu, Upon the return the Gunung Lawu working area,
kegiatan yang dilakukan di wilayah kerja the activities done in the working area are still in
tersebut sejauh ini masih berupa kajian arkelogi the form of archaeological and sociological
dan sosiologi, serta belum diperolehnya izin studies, and no permit has been obtained,
termasuk izin lingkungan. Dengan demikian, including environmental permit. Thus, in Gunung
pada wilayah kerja Gunung Lawu, belum Lawu working area, there is no exploration
terdapat kegiatan eksplorasi yang dapat activity yet, which have an impact on
menimbulkan dampak terhadap lingkungan. environment. Therefore, management believes
Oleh karena itu, manajemen meyakini bahwa that there is no environmental recovery
tidak terdapat potensi kewajiban pemulihan obligation in Gunung Lawu working are since the
lingkungan pada proyek wilayah kerja Gunung physical exploration activity has not been done.
Lawu karena kegiatan fisik eksplorasi sampai
saat ini belum dilaksanakan.
Penyerahan Jaringan Transmisi PLTP Karaha Karaha PLTP Unit 1 Transmission Network
Unit 1 Handover
Sesuai dengan Perjanjian Jual Beli Tenaga Following the Power Purchase Agreement for
Listrik untuk PLTP Karaha Antara Perusahaan the Karaha Geothermal Power Plant between
dan PLN No. 199c/PGE000/2011-S0/127 - the Company and PLN No. 199c/PGE000/2011-
PJ/040/DIR/2011, tanggal 11 Maret 2011, pada S0/127 - PJ/040/DIR/2011, dated March 11,
Pasal 4.2.1 disampaikan bahwa Perusahaan 2011, Article 4.2.1 stipulates that the Group as
sebagai Penjual wajib membiayai dan the Seller, is obligated to finance and construct
membangun jaringan transmisi. Selanjutnya the transmission network. Subsequently, the
Perusahaan akan menyerahkan jaringan Company will deliver that transmission network
transmisi tersebut beserta tanah untuk tapak and the land for tower placement to PLN no later
tower kepada PLN selambat-lambatnya 30 (tiga than 30 (thirty) days after the commercial
puluh) hari setelah tanggal operasi komersial. operation date.
Pada tanggal 25 Juli 2024, telah dilakukan Joint On July 25, 2024, a Joint Committee Meeting
Committee Meeting (“JCM”) untuk membahas (“JCM”) was held to discuss accelerating the
percepatan serah terima transmisi ke PLN. handover of transmission to PLN.
Pada tanggal 9 Desember 2024, dalam On December 9, 2024, during the Follow-Up
Pembahasan Tindak Lanjut Rencana Serah Discussion on the Handover Plan for Special
Terima Aset Special Facilities Independent Facilities Assets of Independent Power
Power Producer (“IPP”) PLTP Karaha 1x30 MW, Producer (“IPP”) PLTP Karaha 1x30 MW, it was
disampaikan bahwa progres pengurusan conveyed that the certification process for tower
sertifikasi lahan tower masuk tahap pengurusan land had entered the technical preparation stage
persiapan teknis untuk 49 lahan. for 49 plots.
Page 121
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/111 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
31. PERJANJIAN, KOMITMEN, DAN KONTINJENSI 31. SIGNIFICANT AGREEMENTS, COMMITMENTS
SIGNIFIKAN (lanjutan) AND CONTINGENCIES (continued)
c. Kontinjensi (lanjutan) c. Contingencies (continued)
Penyerahan Jaringan Transmisi PLTP Karaha Karaha PLTP Unit 1 Transmission Network
Unit 1 (lanjutan) Handover Site Recovery After Operation
(continued)
Pada tanggal 24-25 Juni 2025, telah dilakukan On June 24-25, 2025, a Joint Committee
Joint Committee Meeting (“JCM”) untuk Meeting (“JCM”) was held to discuss
membahas kembali percepatan serah terima accelerating the handover of transmission to
transmisi ke PLN. Progress serah terima PLN once again. The handover of transmission
transmisi saat ini sedang dilaksanakan proses progress is currently in process with tower land
sertifikasi lahan tower dan pengajuan penilaian certification and the submission of assessment
terkait IPPKH transmisi untuk 8 tapak. related to transmission IPPKH for 8 plots.
32. INFORMASI SEGMEN 32. SEGMENT INFORMATION
Grup mengklasifikasikan dan mengevaluasi The Group classifies and evaluates its financial
informasi keuangan mereka menjadi pelaporan information into reportable operating segments
segmen usaha yang dikelompokkan menjadi dua (2) which are grouped into two (2) operational activities
kegiatan operasional dan pelaporan segmen and into reportable geographic segment which are
geografis yang dikelompokkan menjadi enam (6) grouped into six (6) location:
lokasi:
a) Segmen Usaha a) Operating Segment
Grup bergerak di kegiatan operasional sebagai The Group is engaged in the following
berikut: operational activities:
i. Operasi sendiri i. Own operations
ii. Kontrak Operasi Bersama dengan PLN ii. Joint Operating Contracts with PLN
Segmen penjualan KOB ke PLN memiliki aset JOC sales to PLN segment have identifiable
yang dapat dialokasikan berupa piutang usaha. assets in the form of account receivables.
Sedangkan untuk liabilitas yang dapat Whereas the identifiable liabilities are in the form
diatribusikan berupa utang usaha. Aset lainnya of account payables. The other assets and other
dan liabilitas lainnya seperti kas dan pinjaman liabilities such as cash and loan are managed
dikelola secara terpusat melalui kantor pusat. centrally through head office.
b) Segmen Geografis b) Geographic Segment
Ringkasan berikut ini menggambarkan segmen The following summary describes the operating
operasi berdasarkan lokasi geografis dimana segments based on the geographical location
Grup melakukan kegiatan operasional: where the Group conducts operations:
i. Kamojang i. Kamojang
ii. Lahendong ii. Lahendong
iii. Ulubelu iii. Ulubelu
iv. Karaha iv. Karaha
v. Lumut Balai v. Lumut Balai
vi. Segmen lain vi. Other segments
Informasi mengenai segmen yang dilaporkan Information about reportable segments and
dan rekonsiliasi antara ukuran segmen dengan reconciliation between segment measures and
jumlah yang diakui dalam laporan keuangan the amounts recognized in the consolidated
konsolidasian adalah sebagai berikut: financial statements are as follows:
Page 122
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/112 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
32. INFORMASI SEGMEN (lanjutan) 32. SEGMENT INFORMATION (continued)
b) Segmen Geografis (lanjutan) b) Geographic Segment (continued)
30 September (Tidak Diaudit)/September 30 (Unaudited), 2025
Segmen Lain/
Lumut Other
Kamojang Lahendong Ulubelu Karaha Balai Segment Total
Pendapatan usaha 116.035 62.381 91.342 7.720 40.933 - 318.861 Revenue
Beban pokok pendapatan Cost of revenue
dan biaya langsung lainnya (25.417) (28.882) (42.343) (14.090) (29.085) (399) (140.216) and other direct cost
Laba bruto 90.618 33.949 48.999 (6.370) 11.848 (399) 178.645 Gross profit
General and administrative
Beban umum dan administrasi (7.718) (4.037) (6.086) (616) (2.690) (18) (21.165) expenses
Pendapatan Other
lain-lain, bersih 407 220 320 27 144 - 1.118 income, net
Laba usaha 83.307 30.132 43.233 (6.959) 9.302 (417) 158.598 Operating profit
Pendapatan keuangan 8.021 4.343 6.314 534 2.829 - 22.041 Finance income
Laba selisih kurs, bersiih (3.720) (2.014) (2.928) (248) (1.312) - (10.222) Foreign exchange gain, net
Bagian laba dari ventura bersama (8) (4) (7) (1) (3) - (23) Share of profit in joint ventures
Beban keuangan (2.906) (2.878) (9.576) (1.866) (5.649) - (22.875) Finance cost
Laba/(rugi) sebelum Profit/(loss) before income
beban pajak penghasilan 84.694 29.579 37.036 (8.540) 5.167 (417) 147.519 tax expense
Beban pajak penghasilan (23.859) (8.144) (10.090) - (1.170) - (43.263) Income tax expense
Laba/(rugi) tahun berjalan 60.835 21.435 26.946 (8.540) 3.997 (417) 104.256 Profit/(loss) for the year
Informasi lain Other informations
Aset segmen 171.525 285.865 461.553 168.200 641.251 567.331 2.295.725 Segment’s assets
Aset yang tidak dapat dialokasikan - - - - - - 666.653 Unallocated assets
Total aset konsolidasian - - - - - - 2.962.378 Total consolidated assets
Liabilitas segmen 20.900 117.409 200.231 37.169 308.401 236.722 920.832 Segment’s liabilities
Liabilitas yang tidak dapat dialokasikan - - - - - - 36.558 Unallocated liabilities
Total liabilitas konsolidasian - - - - - - 957.390 Total consolidated liabilities
Beban penyusutan (11.760) (18.417) (30.081) (10.425) (20.809) - (91.492) Depreciation expense
Penambahan aset tetap 506 2.219 8.406 8.066 29.468 3.514 52.179 Fixed asset additions
30 September (Tidak Diaudit)/September 30 (Unaudited), 2024
Segmen Lain/
Lumut Other
Kamojang Lahendong Ulubelu Karaha Balai Segment Total
Pendapatan usaha 116.091 62.646 88.859 7.010 31.415 - 306.021 Revenue
Beban pokok pendapatan Cost of revenue
dan biaya langsung lainnya (22.990) (25.284) (38.315) (11.643) (21.440) (342) (120.014) and other direct cost
Laba bruto 93.101 37.362 50.544 (4.633) 9.975 (342) 186.007 Gross profit
General and administrative
Beban umum dan administrasi (5.645) (3.019) (4.449) (362) (1.536) (14) (15.025) expenses
Pendapatan Other
lain-lain, bersih 309 167 236 19 83 - 814 income, net
Laba usaha 87.765 34.510 46.331 (4.976) 8.522 (356) 171.796 Operating profit
Pendapatan keuangan 9.391 5.068 7.188 567 2.542 - 24.756 Finance income
Laba selisih kurs, bersiih 4.954 2.673 3.792 299 1.341 - 13.059 Foreign exchange gain, net
Bagian laba dari ventura bersama 148 80 113 9 40 - 390 Share of profit in joint ventures
Beban keuangan (599) (1.635) (8.941) (1.694) (3.926) - (16.795) Finance cost
Laba/(rugi) sebelum Profit/(loss) before income
beban pajak penghasilan 101.659 40.696 48.483 (5.795) 8.519 (356) 193.206 tax expense
Beban pajak penghasilan (30.425) (12.086) (14.309) - (2.416) - (59.236) Income tax expense
Laba/(rugi) tahun berjalan 71.234 28.610 34.174 (5.795) 6.103 (356) 133.970 Profit/(loss) for the year
31 Desember/December 31, 2024
Informasi lain Other informations
Aset segmen 177.393 298.147 463.555 171.398 615.581 572.447 2.298.521 Segment’s assets
Aset yang tidak dapat dialokasikan - - - - - - 698.881 Unallocated assets
Total aset konsolidasian - - - - - - 2.997.402 Total consolidated assets
Liabilitas segmen 26.255 115.979 226.766 41.511 295.776 246.009 952.296 Segment’s liabilities
Liabilitas yang tidak dapat dialokasikan - - - - - - 36.354 Unallocated liabilities
Total liabilitas konsolidasian - - - - - - 988.650 Total consolidated liabilities
Beban penyusutan (15.607) (24.769) (39.165) (12.590) (21.202) - (113.333) Depreciation expense
Penambahan aset tetap 22.203 27.585 23.317 13.041 106.504 2.762 195.412 Fixed asset additions
Page 123
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/113 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
32. INFORMASI SEGMEN (lanjutan) 32. SEGMENT INFORMATION (continued)
b) Segmen Geografis (lanjutan) b) Geographic Segment (continued)
Segmen Kamojang, Lahendong, Ulubelu, Kamojang, Lahendong, Ulubelu, Karaha, Lumut
Karaha, Lumut Balai dan Segmen lain memiliki Balai and Other segment have identifiable
aset yang dapat dialokasikan berupa: aset tetap, assets in the form of: fixed assets, inventories,
persediaan dan piutang usaha. Sedangkan and account receivables. Whereas, the
untuk liabilitas yang dapat diatribusikan berupa identifiable liabilities are in the form of account
utang usaha dan beban yang masih harus payables and accrued expenses. The other
dibayar. Aset lainnya dan liabilitas lainnya assets and other liabilities such as cash and loan
seperti kas dan pinjaman dikelola secara are managed centrally through head office.
terpusat melalui kantor pusat.
Untuk wilayah kerja panas bumi yang belum For geothermal working area that are not yet
beroperasi, yaitu Hululais, Bukit Daun, Sungai operated, namely Hululais, Bukit Daun, Sungai
Penuh, Kotamobagu, dan Seulawah, aset Penuh, Kotamobagu, and Seulawah, the
segmennya disajikan sebagai bagian dari segment’s assets are reported as parts of other
segmen lain. segment.
Tidak terdapat transaksi antar segmen pada There are no inter-segment transactions in the
segmen operasi Grup. Group's operating segments.
Untuk wilayah kerja panas bumi yang dihentikan For the discontinued geothermal working area
operasinya yaitu Sibayak disajikan sebagai namely Sibayak, it is reported as a part of other
bagian dari segmen lain. segments.
33. ASET DAN LIABILITAS KEUANGAN DALAM 33. FINANCIAL ASSETS AND LIABILITIES IN
MATA UANG ASING FOREIGN CURRENCIES
Grup memiliki aset dan liabilitas dalam mata uang The Group has assets and liabilities denominated in
asing dengan rincian sebagai berikut (dalam satuan foreign currencies as follows (in full amounts):
penuh):
30 September (Tidak Diaudit)/ September 30 (Unaudited), 2025
Rupiah Yen Euro Pound USD
Aset keuangan Financial assets
Kas dan setara kas 394.855.351.502 - 706.861 - 603.639.580 Cash and cash equivalents
Kas yang
dibatasi penggunaannya 7.085.751.338 - - - - Restricted cash
Piutang usaha Trade receivables
- Pihak yang berelasi - - - - 159.344.009 Related parties -
- Pihak ketiga - - - - 3.426.600 Third parties -
Piutang lain-lain Other receivables
- Pihak yang berelasi 154.318.423.571 - - - - Related parties -
- Pihak ketiga 945.528.689 - - - - Third parties -
Aset keuangan yang dinilai
pada nilai wajar melalui Financial assets at
penghasilan komprehensif fair value through other
lain 48.000.000 - - - 21.711.291 comprehensive income
557.253.055.100 - 706.861 - 788.121.480
Liabilitas keuangan Financial liabilities
Utang usaha Trade payables
- Pihak yang berelasi (13.797.239.870) - - - (45.385) Related parties -
- Pihak ketiga (29.895.448.329) (183.150) (47.949) - (67.561.485) Third parties -
Utang lain-lain Other payables
- Pihak yang berelasi (125.809.046.446) - - - (43.622) Related parties -
Utang Obligasi - - - - (398.948.488) Bonds Payable
Pinjaman jangka panjang Long-term loans
- Pihak yang berelasi - (22.254.470.273) - - (212.027.058) Related party -
Biaya yang masih
harus dibayar (512.801.258.123) (1.031.093.066) (25.279) - (17.439.983) Accrued expenses
Liabilitas sewa (52.623.302.523) - - - - Lease Liabilities
(734.926.295.292) (23.285.746.489) (73.228) - (696.066.020)
Aset/(liabilitas) neto (117.673.240.191) (23.285.746.489) 633.634 - 92.055.460 Net asset/(liabilities)
Page 124
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/114 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
33. ASET DAN LIABILITAS KEUANGAN DALAM 33. FINANCIAL ASSETS AND LIABILITIES IN
MATA UANG ASING (lanjutan) FOREIGN CURRENCIES (continued)
31 Desember/December 31, 2024
Rupiah Yen Euro Pound USD
Aset keuangan Financial assets
Kas dan setara kas 164.557.518.892 - 706.884 - 644.269.252 Cash and cash equivalents
Kas yang
dibatasi penggunaannya 6.823.773.026 - - - - Restricted cash
Piutang usaha Trade receivables
- Pihak yang berelasi - - - - 124.626.524 Related parties -
- Pihak ketiga - - - - 3.498.414 Third parties -
Piutang lain-lain Other receivables
- Pihak yang berelasi 143.722.023.939 - - - 2.674.730 Related parties -
- Pihak ketiga 1.590.236.666 - - - - Third parties -
Aset keuangan yang dinilai
pada nilai wajar melalui Financial assets at
penghasilan komprehensif fair value through other
lain 48.000.000 - - - 21.711.291 comprehensive income
316.741.552.523 - 706.884 - 796.780.211
Liabilitas keuangan Financial liabilities
Utang usaha Trade payables
- Pihak yang berelasi (35.800.867.042) - - - (18.166) Related parties -
- Pihak ketiga (155.451.791.956) (944.307.010) (192.826) - (78.756.217) Third parties -
Utang lain-lain Other payables
- Pihak yang berelasi (126.923.211.711) - - - (2.281.247) Related parties -
Utang Obligasi - - - - (398.643.210) Bonds Payable
Pinjaman jangka panjang Long-term loans
- Pihak yang berelasi - (18.380.903.724) - - (226.767.274) Related party -
Biaya yang masih
harus dibayar (810.044.308.054) (1.628.761.739) (46.794) - (27.548.995) Accrued expenses
Liabilitas sewa (63.824.075.666) - - - - Lease Liabilities
(1.192.044.254.429) (20.953.972.473) (239.620) - (734.015.109)
Aset/(liabilitas) neto (875.302.701.906) (20.953.972.473) 467.264 - 62.765.102 Net asset/(liabilities)
34. PERUBAHAN LIABILITAS YANG TIMBUL DARI 34. CHANGES IN LIABILITIES ARISING FROM
AKTIVITAS PENDANAAN FINANCING ACTIVITIES
30 September
(Tidak Diaudit)/
September 30 31 Desember/
(Unaudited), December 31,
2025 2024
Utang Obligasi Bonds Payable
Saldo awal 398.643 398.236 Beginning balance
Perubahan non-kas: Non-cash changes:
- Beban transaksi yang ditangguhkan Deferred transaction costs -
dikurangi akumulasi amortisasi 305 407 amortization net of accumulated
Saldo akhir (Catatan 16) 398.948 398.643 Ending balance (Note 16)
Page 125
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/115 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
34. PERUBAHAN LIABILITAS YANG TIMBUL DARI 34. CHANGES IN LIABILITIES ARISING FROM
AKTIVITAS PENDANAAN (lanjutan) FINANCING ACTIVITIES (continued)
30 September
(Tidak Diaudit)/
September 30 31 Desember/
(Unaudited), December 31,
2025 2024
Pinjaman jangka Panjang Long-term loans
Saldo awal 343.219 330.583 Beginning balance
Arus kas: Cash flow:
- Pinjaman khusus (17.713) (14.824) Specific loan -
Perubahan non-kas: Non-cash changes:
- Pinjaman khusus 29.025 37.646 Specific loan -
- Selisih kurs 7.171 (10.186) Foreign exchange -
Saldo akhir (Catatan 26j) 361.702 343.219 Ending balance (Note 26j)
35. AKTIVITAS YANG TIDAK MEMPENGARUHI 35. ACTIVITIES NOT AFFECTING CASH FLOWS
ARUS KAS
30 September
(Tidak Diaudit)/
September 30 31 Desember/
(Unaudited), December 31,
2025 2024
Penambahan aset Geothermal property
panas bumi yang berasal dari additions resulting from
- Pinjaman khusus 29.025 37.646 Specific loan -
- Kapitalisasi biaya Capitalization of -
bunga pinjaman 1.874 3.495 borrowing costs
Transaksi non kas lainnya adalah perolehan aset The other non-cash transaction is acquisition of
berupa kendaraan dan gedung melalui mekanisme assets which are vehicles and building through lease
sewa sebagaimana yang telah dijabarkan dalam mechanism as discussed in Note 10.
Catatan 10.
Page 126
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/116 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
36. STANDAR AKUNTANSI YANG TELAH 36. ACCOUNTING STANDARDS ISSUED BUT NOT
DITERBITKAN NAMUN BELUM BERLAKU YET EFFECTIVE
EFEKTIF
Standar akuntansi yang telah diterbitkan sampai The accounting standards that have been issued up
tanggal penerbitan laporan keuangan konsolidasian to the date of issuance of the Group’s consolidated
Grup namun belum berlaku efektif, diungkapkan di financial statements, but not yet effective, are
bawah ini. Manajemen bermaksud untuk disclosed below. The management intends to adopt
menerapkan standar-standar tersebut yang these standards that are considered relevant to the
dipertimbangkan relevan terhadap Grup pada saat Group when they become effective, and the impact to
efektif, dan dampaknya terhadap posisi dan kinerja the consolidated financial position and performance
keuangan konsolidasian Grup masih dievaluasi pada of the Group is still being evaluated as of October 24,
tanggal 24 October 2025: 2025:
Mulai efektif pada atau setelah tanggal 1 Januari Effective beginning on or after January 1, 2026
2026
PSAK 109: Instrumen Keuangan dan PSAK 107 PSAK 109: Financial Instruments and PSAK 107
Instrumen Keuangan: Pengungkapan tentang Financial Instruments: Disclosures about the
Klasifikasi dan Pengukuran Instrumen Keuangan Classification and Measurement of Financial
Instruments
Amendemen ini menambahkan dan mengklarifikasi These amendments add and clarify provisions in
ketentuan dalam PSAK 109 terkait penghentian PSAK 109 related to the derecognition of financial
pengakuan liabilitas keuangan, serta mengklarifikasi liabilities and clarify the assessment of cash flow
penilaian karakteristik arus kas untuk aset keuangan characteristics for ESG-linked financial assets,
dengan fitur ESG-linked, aset keuangan dengan fitur financial assets with non-recourse features, and
non-recourse, dan instrumen yang terikat secara contractually bound instruments such as tranches.
kontraktual seperti tranche. Amendemen ini juga These amendments also change the provisions in
mengubah ketentuan dalam PSAK 107 terkait PSAK 107 related to disclosure requirements for
persyaratan pengungkapan investasi pada instrumen investments in equity instruments measured at fair
ekuitas yang diukur pada nilai wajar melalui value through other comprehensive income and add
penghasilan komprehensif lain dan menambah provisions related to financial instruments with
ketentuan terkait instrumen keuangan dengan contractual terms that change the timing or amount
persyaratan kontraktual yang mengubah waktu atau of contractual cash flows.
jumlah arus kas kontraktual.
Mulai efektif pada atau setelah tanggal 1 Januari Effective beginning on or after January 1, 2027
2027
PSAK 118: Penyajian dan Pengungkapan dalam PSAK 118: Presentation and Disclosure in Financial
Laporan Keuangan Statements
Amendemen ini mensyaratkan perubahan This amendment primarily requires changes to the
terutamanya pada penyajian subtotal laba (rugi) presentation of subtotals for operating profit (loss),
operasi, laba (rugi) sebelum pendanaan dan pajak profit (loss) before financing and income tax, and
penghasilan, serta laba (rugi). Amandemen ini juga profit (loss). The amendment also revises the
mengubah penghasilan dan beban untuk classification of income and expenses into operating,
diklasifikasikan ke dalam kategori operasi, investasi, investing, financing, as well as income taxes and
dan pendanaan, serta pajak penghasilan dan operasi discontinued operations categories. These changes
yang dihentikan. Perubahan ini mengakibatkan result in a more consistent income statement
struktur laporan laba rugi yang lebih konsisten dan structure and enhance comparability across
meningkatkan komparabilitas antar perusahaan. companies.
Page 127
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/117 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
37. REKLASIFIKASI AKUN 37. RECLASSIFICATION OF ACCOUNTS
Grup melakukan reklasifikasi akun pada laporan laba Group has reclassified accounts in the consolidated
rugi dan penghasilan komprehensif lain statement of profit or loss and other comprehensive
konsolidasian atas beban pokok pendapatan dan income related to cost of revenue, other direct
beban langsung lainnya dan beban umum dan expenses, and general and administrative expenses
administrasi (Catatan 21, 22, 32b) untuk periode (Notes 21, 22, 32b) for the period ended September
yang berakhir 30 September 2024. Selain itu Grup 30, 2024. In addition, Group has also reclassified
juga melakukan reklasifikasi pada laporan posisi accounts in the statement of financial position related
keuangan atas kas yang dibatasi penggunaannya to restricted cash and other assets, net (Note 13a) for
dan aset lain-lain bersih (Catatan 13a) untuk tahun the year ended December 31, 2024. These
yang berakhir 31 Desember 2024. Reklasifikasi ini reclassifications were made to conform with the
dilakukan agar sesuai dengan penyajian laporan presentation of the consolidated financial statements
keuangan konsolidasian untuk periode yang berakhir for the period ended September 30, 2025.
30 September 2025.
Sebelum Setelah
reklasifikasi/ reklasifikasi/
before Reklasifikasi/ after
reclassification reclassification reclassification
30 September 2024 (Tidak Diaudit) September 30, 2024 (Unaudited)
Laporan Laba Rugi dan Interim Consolidated Statements
Penghasilan Komprehensif of Profit or Loss and Other
Lain Konsolidasian Interim Comprehensive Income
Pendapatan 306.021 - 306.021 Revenue
Beban pokok pendapatan Cost of revenue
dan beban langsung lainnya (132.197) 12.183 (120.014) and other direct cost
Laba Bruto 173.824 186.007 Gross Profit
General and
Beban umum dan administrasi (2.842) (12.183) (15.025) administrative expenses
Pendapatan keuangan 24.756 (24.756) - Finance income
Pendapatan/(beban) lain-lain, bersih 14.263 (13.059) 1.204 Other income/(expense), net
Laba Usaha 210.001 172.186 Operating Profit
Pendapatan keuangan - 24.756 24.756 Finance income
Laba selisih kurs - 13.059 13.059 Gain foreign exchange
Beban keuangan (16.795) - (16.795) Finance costs
Laba sebelum Beban Profit Before
Pajak Penghasilan 193.206 193.206 Income Tax Expense
31 Desember 2024 December 31, 2024
Laporan Posisi Keuangan Interim Consolidated Statement
Konsolidasian Interim of Financial Position
Aset Lancar Current Assets
Kas yang dibatasi
penggunaannya 123 114 237 Restricted cash
Aset lain-lain, bersih 5.194 (114) 5.080 Other assets, net
Page 128
PT PERTAMINA GEOTHERMAL ENERGY TBK
DAN ENTITAS ANAKNYA / AND ITS SUBSIDIARIES
Lampiran 5/118 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2025 AS OF SEPTEMBER 30, 2025
DAN UNTUK PERIODE SEMBILAN BULAN AND FOR THE NINE-MONTH
YANG BERAKHIR PADA TANGGAL TERSEBUT PERIOD THEN ENDED
(Disajikan dalam ribuan dolar Amerika Serikat, (Expressed in thousands of United States dollar
kecuali dinyatakan lain) unless otherwise stated)
38. PERISTIWA SETELAH PERIODE PELAPORAN 38. EVENTS AFTER THE REPORTING PERIOD
Pada tanggal 14 Oktober 2025, perusahaan On 14 October 2025, the company submitted an
menyampaikan laporan keterbukaan informasi information disclosure report in connection with the
sehubungan dengan hasil pelaksanaan Program results of the implementation of the Management and
Management and Employee Stock Option Program Employee Stock Option Program (MESOP) Phase I,
(MESOP) Tahap I, Tahap II, dan Tahap III (yang Phase II, and Phase III which was carried out for 30
dilaksanakan selama 30 hari bursa terhitung sejak trading days starting from August 24, 2025.
tanggal 24 Agustus 2025.
Pada tanggal laporan keuangan diterbitkan, susunan As at the date of issuance of the financial
pemegang saham Perusahaan adalah sebagai statements, the Company’s shareholders are as
berikut: follows:
Persentase
kepemilikan/
Percentage of Nilai Rp /
Lembar/Shares ownership IDR Value Nilai/Value
PT Pertamina Power Indonesia 28.568.460.000 68,32 14.284.230.000.000 1.014.841 PT Pertamina Power Indonesia
Masdar Indonesia Solar Holdings Masdar Indonesia Solar Holdings
RSC Limited 6.209.421.300 14,85 3.104.710.650.000 220.578 RSC Limited
PT Pertamina Pedeve Indonesia 2.477.682.000 5,93 1.238.841.000.000 88.015 PT Pertamina Pedeve Indonesia
Lain-lain - Publik (masing- masing
di bawah 5%) 4.560.200.096 10,90 2.280.100.048.000 160.079 Others - Public (each below 5%)
Jumlah 41.815.763.396 100,00 20.907.881.698.000 1.483.513 Total
Names mentioned 76 people and organisations named in the text · linked when the evidence is strong
unresolved
org
Geothermal Energy Tbk
p.3 ×2
unresolved
person
Marianne Vincentia Hamdani
p.11 ×2
unresolved
org
Menteri Hukum dan Hak
p.11
unresolved
org
Ministry of Law and Human Rights
p.11
unresolved
org
Minister of Law and Human
p.11
unresolved
org
Indonesia Stock Exchange
p.12 ×2
unresolved
org
Financial Services Authority
p.13 ×2
unresolved
org
PT Pertamina Geothermal Energy Lawu
p.15 ×2
unresolved
org
PT Pertamina Geothermal Kotamobagu
p.15
unresolved
org
PT Geothermal Energi Seulawah
p.15
unresolved
org
PT Cahaya
p.16 ×3
unresolved
org
PT Cahaya Anagata Energy
p.16 ×7
unresolved
org
Chevron New Energies Holdings Indonesia Ltd.
p.16 ×3
unresolved
org
Minister of Energy
p.16 ×3
unresolved
org
PT Jasa Daya Daya Chevron
p.16
unresolved
org
PT Jasa Daya Chevron
p.16
unresolved
org
New Energies Holdings Indonesia Ltd
p.16
unresolved
org
Energies Holdings Indonesia Ltd
p.16
unresolved
org
PT Cahaya Anagata Anagata Energy
p.17
unresolved
org
Minister of Mines and Energy. Following Government Peraturan Pemerintah
p.17
unresolved
org
Menteri Energi dan Sumber Daya
p.18
unresolved
person
Lenny Janis Ishak
p.18 ×2
unresolved
person
H. Pengusahaan
p.18
unresolved
org
Menteri Energi dan Sumber
p.18
unresolved
org
Minister of Energy and Mineral Daya Mineral
p.18
unresolved
org
Menteri Energi dan Sumber Daya Mineral
p.18
unresolved
org
Minister of Energy and Mineral Resources
p.18
unresolved
org
Menteri ESDM
p.19 ×2
unresolved
org
PT Pertamina Geothermal Energy Kotamobagu
p.19
unresolved
org
PT PLN
p.20 ×2
unresolved
org
Salak Ltd.
p.21
unresolved
org
Star Energy Geothermal Salak Pratama Ltd.
p.21
unresolved
org
Darajat II Ltd.
p.21
unresolved
org
Wayang Windu Ltd.
p.21
unresolved
org
Sarulla Operation Ltd.
p.21
unresolved
org
Bali Energy Ltd.
p.21
unresolved
org
Menteri Keuangan
p.35
unresolved
org
Minister of Finance
p.35
unresolved
org
Ministry of Finance Keuangan
p.35
unresolved
org
Kementerian Keuangan
p.35
unresolved
org
Bank BRI
p.59 ×3
unresolved
org
Bank BRI Bank Mandiri
p.59
unresolved
org
Bank Mandiri Bank BNI
p.59
unresolved
org
Bank BNI Subjumlah
p.59 ×2
unresolved
org
Bank BTN Bank Mandiri
p.59
unresolved
org
KJPP Amin Nirwan Amin Nirwan Alfiantori & Rekan
p.65
unresolved
org
KJPP Amin Nirwan Amin Nirwan Alfiantori
p.65
unresolved
org
Alfiantori & Rekan
p.65
unresolved
org
PT Tugu Pratama Indonesia
p.65 ×2
unresolved
org
PT CAE
p.67 ×2
unresolved
org
KJPP Setiady dan Rekan
p.81
unresolved
org
KJPP Setiady
p.81
unresolved
org
Antonius Setiady dan Rekan
p.81
Extraction attempts how the parser did, and what it refused
Nothing structured was extracted from this document — the attempts below say why.
No extraction attempted yet.