Skip to content
Back to announcement

20250929_JSMR_Tanggapan atas Permintaan Penjelasan Bursa_31952931_lamp1.pdf

Other Text extracted JSMR

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 6

Page 1 OCR 0.951
G JASAMARGA

Nomor 1 AB.HM.04.278 29 September 2025
Lampiran po
Perihal : Penjelasan PT Jasa Maga (Persero) Tbk (“Perseroan”) atas

Pemberitaan di Media Massa

Kepada Yth.

Direktur Penilaian Perusahaan

PT Bursa Efek Indonesia

Indonesia Stock Exchange Building, Tower I
Jl. Jend Sudirman Kav 52-53

Jakarta 12190

u.p. Kepala Divisi Penilaian Perusahaan Group 2

Merujuk pada surat PT Bursa Efek Indonesia No: S-11189/BEI.PP2/09-2025 tanggal
26 September 2025 perihal Permintaan Penjelasan Atas Pemberitaan di Media Massa,
bersama ini kami menyampaikan penjelasan atas pemberitaan tersebut, sebagai berikut:

1. Hal-hal yang dijelaskan:
1. Klarifikasi atas kebenaran berita tersebut.

Dapat kami sampaikan bahwa terhadap 7 Gerbang Tol (GT) yang dibakar massa saat
penyampaian pendapat di Gedung MPR/DPR yang mengarah pada tindakan anarkis
pada tanggal 29-30 Agustus 2025, telah dilakukan recovery bertahap dengan
mengoperasikan GT menggunakan Mobile Reader mulai tanggal 30 Agustus 2025
dan seluruh Gardu Tol Otomatis (GTO) sudah dioperasikan sejak tanggal 10
September 2025 dengan harapan Perseroan dapat tetap melayani kebutuhan
pengguna jalan.

Adapun proses percepatan perbaikan konstruksi dilakukan sesuai dengan tingkat
kondisi kerusakannya. Konstruksi major dilakukan pada bagian yang mengalami
kerusakan berat dan dalam prosesnya, membutuhkan penutupan sementara GT
untuk menjamin keselamatan pengguna jalan tol saat melintas di GT tersebut.
Adapun penutupan GT sementara dilakukan di empat GT (Semanggi 1, Slipi 1, Slipi
2, dan Kuningan 1) pada tanggal 23 September 2025 pukul 23.00 sampai dengan 25
September 2025 pukul 06.00 dan 1 GT yaitu Pejompongan pada tangga! 23
September sampai dengan 4 Oktober 2025. Setelah konstruksi major ditakukan,
selanjutnya penutupan dilakukan secara parsial untuk kegiatan perbaikan minor dan
gerbang tol tetap beroperasi secara normal sejak tanggal 25 September 2025.

2. Bagaimana estimasi durasi penyelesaian renovasi 7 Gerbang Tol Dalam Kota
tersebut dan kapan target seluruh gerbang dapat kembali beroperasi normal?
Perseroan senantiasa mengupayakan secara optimal melayani pengguna jalan tol
dengan mempercepat pelaksanaan perbaikan yang ditargetkan akan selesai pada
akhir bulan September untuk GT Senayan dan GT Semanggi 1. Untuk 5 gerbang tol
lainnya (GT Pejompongan, Semanggi 2, Kuningan 1, Slipi 1, dan Slipi 2) ditargetkan
selesai pada awal bulan Oktober 2025.

PT Jasa Marga (Persero) Tbk.

Plaza Tol Taman Mini Indonesia Indah
Jakarta 13550 - Indonesia

Tel 462 21 841 3526, 841 3630
wwwvjasamarga.com
Page 2 OCR 0.952
3. Apakah Perseroan telah menyiapkan skema kompensasi, pengalihan arus lalu lintas,

atau fasilitas alternatif untuk mengurangi kemacetan akibat penutupan gerbang tol
tersebut?
Perseroan telah menyiapkan sejumlah langkah untuk meminimalkan dampak
penutupan gerbang tol terhadap kelancaran lalu lintas pengguna jalan. Pertama, kami
telah berkoordinasi dengan Kementerian Pekerjaan Umum, Kepolisian, dan para
pemangku kepentingan terkait untuk menyiapkan skema pengalihan arus lalu lintas
yang akan masuk Jalan Tol Dalam Kota melalui gerbang tol atau akses masuk
alternatif terdekat.

Kedua, kami telah menyampaikan rencana penutupan GT melalui berbagai kanal
komunikasi sebelum penutupan GT dan menyediakan informasi kondisi lalu lintas
secara real-time melalui Dynamic Message Sign (DMS), media sosial resmi, serta
aplikasi Travoy pada saat penutupan GT. Selanjutnya kami juga melakukan
peningkatan kapasitas transaksi pada gerbang tol yang dilakukan penutupan secara
parsial dengan menyiagakan tambahan mobile reader dan petugas agar kapasitas
transaksi tetap terjaga dan tidak menimbulkan antrean panjang.

Pada saat pelaksanaan penutupan kami berkoordinasi dengan pihak kepolisian
dalam pengaturan lalu lintas terhadap GT pengalihan (seperti GT Semanggi 2 dan
GT Kuningan 2) serta menempatkan petugas layanan lalu lintas untuk membantu di
lapangan.

4. Bagaimana upaya Perseroan untuk menjamin keselamatan dan kenyamanan
pengguna jalan selama proses rekonstruksi berlangsung?
PT Jasa Marga bekerja sama dengan pihak kepolisian untuk memastikan pengaturan
lalu lintas yang baik dan menjaga keselamatan pengguna jalan. Selain itu, proyek
renovasi ini juga mendapatkan dukungan dari Kementerian Pekerjaan Umum yang
memastikan bahwa pekerjaan konstruksi dilakukan sesuai standar keselamatan
(antara lain pemasangan perambuan dan Alat Pelindung Diri / APD bagi petugas).
Petugas terlatih ditempatkan di titik-titik strategis untuk memberikan pengarahan
kepada pengendara, dan setiap pekerjaan dilakukan dengan prosedur yang ketat
untuk meminimalisasi risikc bagi pengguna jalan.

5. Dampak perbaikan beberapa gerbang tol dalam kota tersebut terhadap pendapatan
dan laba tahun berjalan.
Perbaikan beberapa Gerbang Tol Dalam Kota merupakan bagian dari program
peningkatan layanan kepada pengguna jalan yang mengedepankan aspek
keselamatan. Perseroan menilai, dampaknya terhadap pendapatan dan laba tahun
berjalan relatif tidak signifikan, mengingat volume lalu lintas secara keseluruhan
masih dapat terakomodasi melalui gerbang tol alternatif yang tersedia. Kami tetap
fokus menjaga kinerja operasional dan memastikan kinerja keuangan Perseroan
tetap positif tahun ini.

AKHLAK - Amanah, Kompeten, Harmonis, Loyal, Adaptif, Kolaboratif
Page 3 OCR 0.929
2, Informasi/kejadian penting lainnya yang material dan dapat mempengaruhi kelangsungan

hidup perusahaan serta dapat mempengaruhi harga saham perusahaan.
Tidak ada informasi/fakta material lainnya yang dapat Perseroan sampaikan ke publik.

Demikian kami sampaikan, atas perhatiannya kami ucapkan terima kasih.

Ari Wibowo
Corporate Secretary &
Chief Administration Officer

Tembusan Yth.:

« Direktur Keuangan dan Manajemen Risiko PT Jasa Marga (Persero) Tbk,
Direktur Operasi dan Layanan PT Jasa Marga (Persero) Tbk.

HNG/ADP/MKA/HI

T

AKHLAK - Amanah, Kompeten, Harmonis, Loyal, Adaptif, Kolaboratif
Page 4 OCR 0.937
G JASAMARGA

No. 1 AB.HM.04.278 September 29, 2025
Encl 1.
Subject :  Explanation of PT Jasa Marga (Persero) Tbk (“the Company”) on

News in Mass Media

To.

Direktur Penilaian Perusahaan

PT Bursa Efek Indonesia

Indonesia Stock Exchange Building, Tower I
Jl. Jend Sudirman Kav 52-53

Jakarta 12190

Attn. Kepala Divisi Penilaian Perusahaan Group 2

Referring to the Letter of PT Bursa Efek Indonesia (the Indonesia Stock Exchange) No: S-
11189/BEI.PP2/09-2025 dated September 26, 2025 about about Reguest for Further
Explanation in news in Mass Media, we hereby extend the explanation on the news as
follows:

1. Things that need to be explained:
1. Clarification of the news
We would like to inform you that for the seven Toll Gates (GT) were burned by the
masses during the public opinion rally at MPR/DPR building, which escalated into
anarchic actions on August 29-30, 2025, recovery has been carried out gradually by
operating GT using mobile readers starting from August 30, 2025 and all Automatic
Toll Gates (GTO) have been operated since September 10, 2025, with the company
expectation to continue serve the needs of toll road users.

The accelerated construction repair process was carried out according to the severity
of the damage. Major construction was conducted on the parts that suffered
significant damage, which reguired temporary closure of the toll gates (GT) to ensure
the safety of toll road users passing through those GT. The temporary closure were
implemented at four GTs (Semanggi 1, Slipi 1, Slipi 2, and Kuningan 1) from
September 23, 2025, at 11:00 PM until September 25, 2025, at 06:00 AM, and at 1
GT namely Penjompongan GT, from September 23, 2025 until October 4, 2025.
Following the completion of major construction works, partial closure was carried out
for minor repairs, during which the toll gates remained in normal operation as of
September 25, 2025.

2. How is the estimated duration for the renovation completion of the 7 Inner-City Toll
Gates and when is the target for all gates to resume in normal operations?
The company remains committed to optimally serve toll road users by expediting the
repair works, which are targeted for completion by the end of September 2025 for
Senayan and Semanggi 1 GTs. The remaining 5 GTs (Pejompongan, Semanggi 2,
Kuningan 1, Slipi 1, and Slipi 2) are expected to be completed in early October 2025.

PT Jasa Marga (Persero) Tbk.

Plaza Tol Taman Mini Indonesia Indah
Jakarta 13550 - Indonesia

Tel 462 21 841 3526, 841 3630
www/jasamarga.com
Page 5 OCR 0.940
3. Has the company prepared a compensation scheme, traffic transfer plan, or
alternative facilities to reduce congestion caused by the toll gate closures?
The company has prepared several efforts to minimize the impact of the toll gate
Closures on traffic flow of toll road users. Firstiy, we have coordinated with the Ministry
of Public Works, the Police, and other relevant parties in order to develop a traffic
transfer plan scheme for traffic entering the Inner-City Toll Road through the nearest
GT or the closest alternative access points.

Second, we have communicated the GT closures plan through various
communication channels prior to the GT closures and provided real-time traffic
information through Dynamic Message Signs (DMS), official social media account,
and also from Travoy app during the GT closures. Furthermore, we have increased
transaction capacity at the partially closed toll gates by deploying additional mobile
readers and personnel to maintain transaction capacity and prevent long gueues.

During the closure, we coordinated with the police in managing traffic at the transfer
GT (such as Semanggi 2 and Kuningan 2 GTs) and deployed traffic service personnel
to provide on-site assistance.

4. How about effort that company has made to ensure the safety and comfort of road
users during the construction process?
PT Jasa Marga collaborates with the police to ensure proper traffic management and
maintain the safety of road users. In addition, renovation project is supported by the
Ministry of Public Works, which ensures that all construction work complies with
safety standards (including the installation of road signs and the use of Personal
Protective Eguipment (APD) for workers). Trained personnel are stationed at strategic
points to provide guidance to drivers, and all works are conducted under strict
procedures to minimize risks for road users.

5. Impact of the repairs to several Inner-City Toll Gates on revenue and current year
profit.
The several Inner-City Toll Gates reparation is part of the company's service
improvement program that prioritizes safety aspecis for road users. Company
assesses that the impact on revenue and current year profit is relatively insignificant,
as overall traffic volume can still be accommodated through the other available
alternative GT. We remain focused on maintaining operational performance and
ensuring that company's financial performance remains positive this year.

AKHLAK - Amanah, Kompeten, Harmonis, Loyal, Adaptif, Kolaboratif
Page 6 OCR 0.898
Information/other significant evenis that are material and may affect the sustainability
and the stock price of the companyThere is no other information that may affect the
company's eguity value and share price.

Thus we convey, we thank you for your attention.

Ari Wibowo
Corporate Secretary &
Chief Administration Officer

Attention to:
» Director of Finance and Risk Management PT Jasa Marga (Persero) Tbk,
« Director of Operation and Service of PT Jasa Marga (Persero) Tbk

HNG/ADPIMKA/HE

AKILAK - Amanah, Kompeten, Harmonis, Loyal, Adaptif, Kolaboratif

File

File Open PDF
Source IDX
Size0.22 MB
Published29 Sep 2025
Pages6
Characters11,517
Text sourceOCR
OCR confidence0.934

Names mentioned 8 people and organisations named in the text · linked when the evidence is strong

linked org Jasa Marga (Persero) Tbk. p.1 ×24
linked person Ari Wibowo p.3 ×2
possible org PT Bursa Efek Indonesia p.1 ×4
unresolved org Jasa Maga (Persero) Tbk p.1 ×2
unresolved org PT Bursa Efek Indonesia Indonesia Stock Exchange Building p.1 ×2
unresolved org Indonesia Stock Exchange p.1 ×3
unresolved org Kementerian Pekerjaan Umum p.2 ×2
unresolved org Ministry of Public Works p.5

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result