Source file signed link, expires in 15 minutes
Extracted text 163
Page 1
PT BARITO RENEWABLES ENERGY TBK DAN ENTITAS ANAK/AND SUBSIDIARIES LAPORAN KEUANGAN KONSOLIDASIAN INTERIM/ INTERIM CONSOLIDATED FINANCIAL STATEMENTS 30 JUNI 2025 (TIDAK DIAUDIT) DAN 31 DESEMBER 2024 DAN UNTUK PERIODE ENAM BULAN YANG BERAKHIR PADA TANGGAL 30 JUNI 2025 DAN 2024 (TIDAK DIAUDIT)/ 30 JUNE 2025 (UNAUDITED) AND 31 DECEMBER 2024 AND FOR THE SIX-MONTH PERIODS ENDED 30 JUNE 2025 AND 2024 (UNAUDITED)
Page 2
Page 3
PT BARITO RENEWABLES ENERGY TBK DAN ENTITAS ANAK PT BARITO RENEWABLES ENERGY TBK AND ITS SUBSIDIARIES
LAPORAN POSISI KEUANGAN KONSOLIDASIAN INTERIM INTERIM CONSOLIDATED STATEMENTS OF FINANCIAL POSITION
30 JUNI 2025 (TIDAK DIAUDIT) DAN 31 DESEMBER 2024 30 JUNE 2025 (UNAUDITED) AND 31 DECEMBER 2024
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali nilai nominal dan data saham) except for basic and diluted earnings per share)
30 Juni/ 31 Desember/
Catatan/ 30 June 31 December
Notes 2025 2024
ASET ASSETS
ASET LANCAR CURRENT ASSETS
Kas dan setara kas 7 265,421 162,724 Cash and cash equivalents
Kas dan deposito berjangka
yang dibatasi penggunaannya 8 206,290 341,989 Restricted cash and time deposits
Piutang usaha dan lain-lain - pihak ketiga 9 112,513 112,629 Trade and other receivables - third parties
Piutang sewa pembiayaan - bagian lancar 10 11,822 9,883 Finance lease receivables - current portion
Persediaan 11 17,523 23,301 Inventories
Aset lancar lainnya 6,261 8,261 Other current assets
Jumlah Aset Lancar 619,830 658,787 Total Current Assets
ASET TIDAK LANCAR NON-CURRENT ASSETS
Piutang usaha dan lain-lain Trade and other receivables
- pihak ketiga 9 76,031 68,891 - third parties
Piutang sewa pembiayaan - Finance lease receivables -
bagian tidak lancar 10 390,095 353,566 non-current portion
Barang modal dan peralatan 11 36,866 22,736 Capital spares and equipment
Aset hak guna 5,877 6,915 Right-of-use assets
Aset tetap 12 819,784 835,958 Property, plant and equipment
Aset sewa operasi 13 295,290 309,164 Property on operating lease
Biaya ditangguhkan 12,781 13,740 Deferred charges
Biaya pengembangan proyek 34,317 34,044 Project development costs
Aset tidak berwujud 14 1,460,695 1,462,429 Intangible assets
Aset eksplorasi dan evaluasi 6,440 7,009 Exploration and evaluation assets
Aset keuangan derivatif 16 9,925 10,427 Derivative financial assets
Aset tidak lancar lain-lain 3,788 3,847 Other non-current assets
Jumlah Aset Tidak Lancar 3,151,889 3,128,726 Total Non-current Assets
JUMLAH ASET 3,771,719 3,787,513 TOTAL ASSETS
Lihat catatan atas laporan keuangan konsolidasian yang merupakan See accompanying notes to consolidated financial statements
bagian yang tidak terpisahkan dari laporan keuangan konsolidasian. which are an integral part of the consolidated financial statements.
1
Page 4
PT BARITO RENEWABLES ENERGY TBK DAN ENTITAS ANAK PT BARITO RENEWABLES ENERGY TBK AND ITS SUBSIDIARIES
LAPORAN POSISI KEUANGAN KONSOLIDASIAN INTERIM INTERIM CONSOLIDATED STATEMENTS OF FINANCIAL POSITION
30 JUNI 2025 (TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) 30 JUNE 2025 (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali nilai nominal dan data saham) except for basic and diluted earnings per share)
30 Juni/ 31 Desember/
Catatan/ 30 June 31 December
Notes 2025 2024
LIABILITAS DAN EKUITAS LIABILITIES AND EQUITY
LIABILITAS JANGKA PENDEK CURRENT LIABILITIES
Utang usaha dan lain-lain: Trade and other payables:
Pihak berelasi 15, 26b 10 97 Related parties
Pihak ketiga 15 8,816 21,104 Third parties
Utang pajak - bagian jangka pendek Taxes payable - current portion:
Pajak penghasilan badan 25a 42,417 36,512 Corporate income tax
Pajak lain-lain 25a 1,238 6,438 Other taxes
Beban yang masih harus dibayar 15 80,979 87,119 Accrued expenses
Liabilitas sewa - bagian jangka pendek 2,004 1,853 Lease liabilities - current portion
Pinjaman - bagian jangka pendek 16 191,356 202,613 Borrowings - current portion
Jumlah Liabilitas Jangka Pendek 326,820 355,736 Total Current Liabilities
LIABILITAS JANGKA PANJANG NON-CURRENT LIABILITIES
Utang lain-lain 15 328 7,377 Other payable
Utang pajak lain-lain 25a 5,905 5,931 Other taxes payable
Saldo make-up account Perusahaan Listrik Negara (“PLN”)
Perusahaan Listrik Negara (“PLN”) 17 22,338 23,182 make-up account balances
Liabilitas sewa - bagian jangka panjang 4,260 5,115 Lease liabilities - non-current portion
Pinjaman - bagian jangka panjang 16 1,841,954 1,894,624 Borrowings - non-current portion
Liabilitas imbalan pasca kerja 18 18,336 16,934 Post-employment benefits liabilities
Liabilitas derivatif 3,742 - Derivative liabilities
Liabilitas pajak tangguhan 25c 733,207 746,081 Deferred tax liabilities
Jumlah Liabilitas Jangka Panjang 2,630,070 2,699,244 Total Non-current Liabilities
JUMLAH LIABILITAS 2,956,890 3,054,980 TOTAL LIABILITIES
EKUITAS EQUITY
Ekuitas yang diatribusikan kepada Equity attributable to owners
pemilik Entitas Induk of the Company
Modal saham - nilai nominal Rp 150 per saham Capital stock - par value of Rp 150 per share
pada 30 Juni 2025 (31 Desember 2024: at June 30, 2025 (December 31, 2024:
Rp 150 per saham) Rp 150 per share)
Modal dasar - 500.000.000.000 saham pada Authorized - 500,000,000,000 shares at
30 Juni 2025 (31 Desember 2024: June 30, 2025 (December 31, 2024:
500.000.000.000 saham) 500,000,000,000 shares)
Modal ditempatkan dan disetor penuh - Issued and fully paid -
133.786.220.000 saham pada 30 Juni 133,786,220,000 shares at June 30,
2025 (31 Desember 2024: 2025 (December 31, 2024:
133.786.220.000 saham) 19a 1,286,720 1,286,720 133,786,220,000 shares)
Saham treasuri 20 (1,930) - Treasury shares
Tambahan modal disetor 19b (338,977) (338,977) Additional paid-in capital
Selisih kurs karena penjabaran Difference arising from translation
Laporan keuangan dalam of non-US$ currency
Mata uang selain AS$ (460) (516) financial statement
Cadangan lainnya 19c (987,622) (987,622) Other reserves
Saldo laba Retained earnings
Ditentukan penggunaannya 19d 3,231 2,011 Appropriated
Tidak ditentukan penggunaannya 615,117 555,246 Unappropriated
Jumlah ekuitas yang diatribusikan kepada Total equity attributable to owners of
pemilik Entitas Induk 576,079 516,862 the Company
Kepentingan nonpengendali 21 238,750 215,671 Non-controlling interests
Jumlah Ekuitas 814,829 732,533 Total Equity
JUMLAH LIABILITAS DAN EKUITAS 3,771,719 3,787,513 TOTAL LIABILITIES AND EQUITY
Lihat catatan atas laporan keuangan konsolidasian yang merupakan See accompanying notes to consolidated financial statements
bagian yang tidak terpisahkan dari laporan keuangan konsolidasian. which are an integral part of the consolidated financial statements.
2
Page 5
PT BARITO RENEWABLES ENERGY TBK DAN ENTITAS ANAK PT BARITO RENEWABLES ENERGY TBK AND ITS SUBSIDIARIES
LAPORAN LABA RUGI DAN PENGHASILAN INTERIM CONSOLIDATED STATEMENTS OF PROFIT OR LOSS
KOMPREHENSIF LAIN KONSOLIDASIAN INTERIM AND OTHER COMPREHENSIVE INCOME
UNTUK PERIODE ENAM BULAN YANG BERAKHIR PADA FOR THE SIX-MONTH PERIODS ENDED
TANGGAL 30 JUNI 2025 DAN 2024 (TIDAK DIAUDIT) 30 JUNE 2025 AND 2024 (UNAUDITED)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali laba per saham dasar dan dilusian) except for basic and diluted earnings per share)
Catatan/ 30 Juni/ 30 Juni/
Notes June 2025 June 2024
Pendapatan 22 300,073 290,072 Revenue
Beban depresiasi dan amortisasi 23 (47,728) (36,944) Depreciation and amortisation expenses
Beban kompensasi dan Employee compensation and
tunjangan karyawan 23 (21,630) (21,866) benefits expenses
Beban konsultan dan teknisi 23 (7,257) (6,964) Consultant and technician expenses
Tunjangan produksi kepada Production allowance to
PT Pertamina Geothermal Energy 23 (9,158) (8,417) PT Pertamina Geothermal Energy
Beban keuangan 24 (58,792) (67,920) Finance costs
Kerugian kurs mata uang asing, bersih 23 (397) (519) Loss on foreign exchange, net
Pendapatan bunga 23 5,856 7,558 Interest income
Lain-lain, bersih 23 (8,623) (11,940) Others, net
LABA SEBELUM PAJAK 152,344 143,060 PROFIT BEFORE TAX
BEBAN PAJAK PENGHASILAN - BERSIH 25b (70,213) (69,396) INCOME TAX EXPENSE - NET
LABA TAHUN BERJALAN 82,131 73,664 PROFIT FOR THE YEAR
PENGHASILAN KOMPREHENSIF LAIN OTHER COMPREHENSIVE INCOME
Pos-pos yang tidak akan direklasifikasi Items that will not be reclassified
ke laba rugi: subsequently to profit or loss:
Pengukuran kembali atas program Remeasurement of defined
imbalan pasti, setelah pajak 167 (424) benefits obligation, net of tax
Pos-pos yang akan direklasifikasi Items that may be reclassified
ke laba rugi: subsequently to profit or loss:
Cadangan lindung nilai arus kas 16 (4,509) 119 Hedging reserves for cash flow hedge
Selisih kurs penjabaran laporan keuangan 127 - Foreign currency translation adjustment
Jumlah kerugian komprehensif lain Total other comprehensive loss
tahun berjalan, setelah pajak (4,215) (305) for the year, net of tax
JUMLAH PENGHASILAN KOMPREHENSIF TOTAL COMPREHENSIVE INCOME
TAHUN BERJALAN 77,916 73,359 FOR THE YEAR
LABA TAHUN BERJALAN YANG PROFIT FOR THE YEAR
DIATRIBUSIKAN KEPADA: ATTRIBUTABLE TO:
Pemilik entitas induk 65,466 57,953 Owners of the Company
Kepentingan nonpengendali 21 16,665 15,711 Non-controlling interests
Laba tahun berjalan 82,131 73,664 Profit for the year
JUMLAH PENGHASILAN KOMPREHENSIF TOTAL COMPREHENSIVE
TAHUN BERJALAN YANG INCOME FOR THE YEAR
DIATRIBUSIKAN KEPADA: ATTRIBUTABLE TO:
Pemilik entitas induk 61,147 57,729 Owners of the Company
Kepentingan nonpengendali 21 16,769 15,630 Non-controlling interests
Jumlah Penghasilan Komprehensif Total Comprehensive Income
Tahun Berjalan 77,916 73,359 for the Year
LABA PER SAHAM EARNINGS PER SHARE
(dalam Dolar Amerika Serikat penuh) 27 0.00049 0.00043 (in United States Dollar full amount)
Lihat catatan atas laporan keuangan konsolidasian yang merupakan See accompanying notes to consolidated financial statements
bagian yang tidak terpisahkan dari laporan keuangan konsolidasian. which are an integral part of the consolidated financial statements.
3
Page 6
PT BARITO RENEWABLES ENERGY TBK DAN ENTITAS ANAK PT BARITO RENEWABLES ENERGY TBK AND ITS SUBSIDIARIES
LAPORAN PERUBAHAN EKUITAS KONSOLIDASIAN INTERIM INTERIM CONSOLIDATED STATEMENTS OF CHANGES IN EQUITY
UNTUK PERIODE ENAM BULAN YANG BERAKHIR FOR THE SIX-MONTH PERIODS ENDED
PADA TANGGAL 30 JUNI 2025 DAN 2024 (TIDAK DIAUDIT) 30 JUNE 2025 AND 2024( UNAUDITED)
(Dinyatakan dalam ribuan Dolar Amerika Serikat) (Expressed in thousands of United States Dollars)
Selisih kurs Ekuitas yang
penjabaran diatribusikan
Tambahan laporan kepada pemilik
modal keuangan/ Saldo laba/ entitas induk/
Modal disetor/ Foreign Retained earnings Cadangan Equity Kepentingan Jumlah
saham/ Saham treasuri/ Additional currency Ditentukan Tidak ditentukan lainnya/ attributable nonpengendali/ ekuitas/
Catatan/ Share Treasury paid-in translation penggunaannya/ penggunaannya/ Other to the owners of Non-controlling Total
Notes capital shares capital adjustment Appropriated Unappropriated reserves the Company interests equity
Saldo per 1 Januari 2024 1,286,720 - (338,977) - 911 483,077 (987,622) 444,109 206,229 650,338 Balances as of 1 January 2024
Laba periode berjalan - - - - - 57,953 - 57,953 15,711 73,664 Profit for the period
Selisih kurs karena penjabaran laporan keuangan Difference arising from non-US$
dalam mata uang selain AS$ - - - (301) - - - (301) - (301) currency financial statement
Pencadangan saldo laba - - - - 1,100 (1,100) - - - Appropriation of retained earnings
Transaksi dengan pihak non-pengendali 21 - - - - - - - - 4,509 4,509 Transactions with non-controlling interests
Kerugian komprehensif tahun berjalan - - - - - (224) - (224) (81) (305) Other comprehensive loss for the year
Dividen - - - - - (16,740) - (16,740) (10,950) (27,690) Dividend
Saldo per 30 Juni 2024 1,286,720 - (338,977) (301) 2,011 522,966 (987,622) 484,797 215,418 700,215 Balance as of 30 June 2024
Saldo per 1 Januari 2025 1,286,720 - (338,977) (516) 2,011 555,246 (987,622) 516,862 215,671 732,533 Balances as of 1 January 2025
Laba periode berjalan - - - - - 65,466 - 65,466 16,665 82,131 Profit for the period
Pembelian kembali saham 20 - (1,930) - - - - - (1,930) - (1,930) Shares buyback
Transaksi dengan pihak non-pengendali - - - - - - - - 11,623 11,623 Transactions with non-controlling interests
Dividen tunai - - - - - - - - (5,313) (5,313) Cash dividend
Pencadangan saldo laba - - - - 1,220 (1,220) - - - - Appropriation of retained earnings
Selisih kurs karena penjabaran laporan keuangan Difference arising from non-US$
dalam mata uang selain AS$ - - - 56 - - - 56 71 127 currency financial statement
Kerugian komprehensif tahun berjalan 21 - - - - - (4,375) - (4,375) 33 (4,342) Other comprehensive loss for the year
Saldo per 30 Juni 2025 1,286,720 (1,930) (338,977) (460) 3,231 615,117 (987,622) 576,079 238,750 814,829 Balance as of 30 June 2025
.
Lihat catatan atas laporan keuangan konsolidasian yang merupakan See accompanying notes to consolidated financial statements
bagian yang tidak terpisahkan dari laporan keuangan konsolidasian. which are an integral part of the consolidated financial statements.
4
Page 7
PT BARITO RENEWABLES ENERGY TBK DAN ENTITAS ANAK PT BARITO RENEWABLES ENERGY TBK AND ITS SUBSIDIARIES
LAPORAN ARUS KAS KONSOLIDASIAN INTERIM INTERIM CONSOLIDATED CASH FLOW STATEMENTS
UNTUK PERIODE ENAM BULAN YANG BERAKHIR PADA FOR THE SIX-MONTH PERIODS ENDED
TANGGAL 30 JUNI 2025 DAN 2024 (TIDAK DIAUDIT) 30 JUNE 2025 AND 2024 (UNAUDITED)
(Dinyatakan dalam ribuan Dolar Amerika Serikat) (Expressed in thousands of United States Dollars,
30 Juni/ 30 Juni/
June 2025 June 2024
ARUS KAS DARI AKTIVITAS OPERASI CASH FLOWS FROM OPERATING ACTIVITIES
Penerimaan dari pelanggan 305,236 300,713 Receipts from customers
Pembayaran kepada pemasok dan lainnya (55,870) (51,238) Payments to suppliers and others
Penerimaan bunga 5,856 7,558 Interest received
Pembayaran bunga atas liabilitas sewa (300) (216) Interest payment on lease liabilities
Pembayaran pajak penghasilan (77,864) (82,595) Payment for income taxes
Pembayaran beban keuangan (64,844) (63,476) Payment of finance costs
Kas Bersih Diperoleh dari Aktivitas Operasi 112,214 110,746 Net Cash Provided by Operating Activities
ARUS KAS DARI AKTIVITAS INVESTASI CASH FLOWS FROM INVESTING ACTIVITIES
Penambahan aset tetap (55,861) (19,175) Additions of property, plant and equipment
Penambahan aset sewa operasi (490) (543) Additions of property on operating lease
Penambahan biaya ditangguhkan (1,319) (12) Additions of deferred charges
Penambahan aset eksplorasi dan evaluasi (321) (1,194) Additions of exploration and evaluation assets
Penambahan barang modal dan peralatan (14,130) (3,023) Additions of capital spares and equipment
Penambahan biaya pengembangan proyek (366) - Addition of project development costs
Akuisisi entitas anak, setelah dikurangi kas yang diperoleh - (99,813) Acquisition of subsidiaries, net of cash acquired
Penambahan aset tidak lancar lain-lain - 60 Additions of other non-current assets
Kas Bersih Digunakan untuk Aktivitas Investasi (72,487) (123,700) Net Cash Used in Investing Activities
ARUS KAS DARI AKTIVITAS PENDANAAN CASH FLOWS FROM FINANCING ACTIVITIES
Penerimaan dari utang bank 22,219 113,426 Proceeds from bank loan
Pembayaran kembali utang bank (27,594) (29,000) Repayment of bank loan
Pembayaran senior secured notes (59,090) (33,126) Repayment of senior secured notes
Pembagian dividen kepada kepentingan Dividend distribution to non-controlling
non-pengendali di anak perusahaan (5,313) (10,950) interests in subsidiaries
Pembagian dividen kepada pemilik entitas induk - (16,740) Dividend distribution to owners of the parent entity
Pembelian saham treasuri (1,930) - Buyback shares
Penurunan/(kenaikan) atas kas dan deposito Decrease/(increase) in restricted cash and
berjangka yang dibatasi penggunaannya 135,699 (31,512) time deposits
Pembayaran atas porsi pokok liabilitas sewa (1,021) (874) Payment of principal portion of lease liabilities
Kas Bersih Digunakan untuk Aktivitas Pendanaan 62,970 (8,776) Net Cash Used in Financing Activities
(PENURUNAN) KENAIKAN BERSIH KAS NET (DECREASE) INCREASE IN CASH
DAN SETARA KAS 102,697 (21,730) AND CASH EQUIVALENTS
CASH AND CASH EQUIVALENTS
KAS DAN SETARA KAS AWAL TAHUN 162,724 247,787 AT BEGINNING OF YEAR
KAS DAN SETARA KAS AKHIR PERIODE 265,421 226,057 CASH AND CASH EQUIVALENTS AT END OF PERIOD
Informasi atas aktivitas investasi yang tidak Information of non-cash investing
mempengaruhi arus kas diungkapkan dalam Catatan 29 activities are disclosed in Note 29
Lihat catatan atas laporan keuangan konsolidasian yang merupakan See accompanying notes to consolidated financial statements
bagian yang tidak terpisahkan dari laporan keuangan konsolidasian. which are an integral part of the consolidated financial statements.
5
Page 8
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (UNAUDITED) AND 31 DECEMBER 2024
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
1. UMUM 1. GENERAL
a. Pendirian dan informasi umum a. Establishment and general information
PT Barito Renewables Energy Tbk (dahulu PT Barito Renewables Energy Tbk (formerly
PT Barito Cahaya Nusantara) (“Perusahaan”) PT Barito Cahaya Nusantara) (the “Company”)
didirikan berdasarkan Akta Notaris dari Nanny was established based on the Notarial Deed of
Wiana Setiawan, S.H., notaris di Jakarta, No. 3 Nanny Wiana Setiawan, S.H., notary in Jakarta,
tertanggal 5 Februari 2018. Akta pendirian No. 3 dated 5 February 2018. The Company's
Perusahaan telah disahkan oleh Menteri Hukum dan establishment deed was approved by the Minister
Hak Asasi Manusia Republik Indonesia dengan of Law and Human Rights of the Republic of
surat keputusan No. AHU-0010938.AH.01.01.Tahun Indonesia with Decree No. AHU-0010938.AH.01.01.
2018 tertanggal 1 Maret 2018. Tahun 2018 dated 1 March 2018.
Anggaran Dasar Perusahaan telah mengalami The Company's Articles of Association have been
beberapa kali perubahan. Perubahan terakhir amended several times. The latest amendment
berdasarkan Akta Notaris No 54 tanggal based on Notarial Deed No. 54 dated 15 June 2023
15 Juni 2023 dari Aulia Taufani, S.H., notaris di of Aulia Taufani, S.H., notary in Jakarta was
Jakarta terkait perubahan Anggaran Dasar regarding changes to the Company's Articles of
Perusahaan untuk meningkatkan modal dasar Association to increase the Company’s authorised
Perusahaan dan pemecahan nilai nominal saham. capital and changes in the Company’s nominal
Perubahan Anggaran Dasar Perusahaan ini telah share value. This amendment to the Company's
disetujui oleh Menteri Hukum dan Hak Asasi Articles of Association was approved by
Manusia Republik Indonesia dengan surat the Minister of Law and Human Rights of the
keputusan No. AHU-0033656.AH.01.02.Tahun Republic of Indonesia with Decree
2023 tanggal 16 Juni 2023 (Catatan 1.b). No. AHU-0033656.AH.01.02.Tahun 2023 dated
16 June 2023 (Note 1.b).
Sesuai dengan Pasal 3 anggaran dasar In accordance with Article 3 of the Company’s
Perusahaan, ruang lingkup kegiatan Perusahaan Articles of Association, the scope of the
saat ini adalah sebagai perusahaan holding yang Company’s current activities is as a holding
bergerak dalam aktivitas konsultasi manajemen company engaged in other management
lainnya, pembangkit tenaga listrik dan consulting activities, power generation and
pengusahaan tenaga panas bumi. geothermal power business.
Perusahaan berdomisili di Jakarta dengan kantor The Company is domiciled in Jakarta with its head
pusat beralamat di Wisma Barito Pacific II, Lantai office located at Wisma Barito Pacific II, 23rd Floor,
23, Jl. Letjen S. Parman Kav. 60, Jakarta. Jl. Letjen S. Parman Kav. 60, Jakarta.
Entitas induk langsung dan terakhir Perusahaan The direct parent and ultimate parent entity of the
adalah PT Barito Pacific Tbk. (“Barito Pacific”), Company is PT Barito Pacific Tbk. (“Barito
sebuah perusahaan yang didirikan di Indonesia Pacific”), a company incorporated in Indonesia and
dan tercatat di Bursa Efek Indonesia. listed on the Indonesia Stock Exchange.
Susunan anggota Dewan Komisaris dan Direksi The Company’s Boards of Commissioners and
Perusahaan pada tanggal 30 Juni 2025 dan Directors as at June 30, 2025 and December 31,
31 Desember 2024 adalah sebagai berikut: 2024 were as follows:
30 Juni/ 31 Desember 2024/
30 June 2025 31 December 2024
Komisaris Utama Agus Salim Pangestu Agus Salim Pangestu President Commissioner
Komisaris David Kosasih Erwin Ciputra Commissioners
T. Suan Swee David Kosasih
T. Suan Swee
Komisaris Independen Cholanat Yanaranop Tan Ek Kia Independent Commissioners
Tan Ek Kia Todung Mulya Lubis
Cholanat Yanaranop
Presiden Direktur Hendra Soetjipto Tan Hendra Soetjipto Tan President Director
Direksi Merly Merly Directors
Kenneth Riedel Kenneth Riedel
Agus Sandy Widyanto Agus Sandy Widyanto
6
Page 9
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Pada tanggal 30 Juni 2025 dan 31 Desember 2024 As of 30 June 2025 and 31 December 2024, the
susunan Audit Komite Perusahaan adalah sebagai composition of the Company’s Audit Committee was
berikut: as follows:
Ketua Tan Ek Kia Chairman
Anggota Jennywati Soewito Members
Dikdik Sugiharto
Pada tanggal 30 Juni 2025, Perusahaan dan As at 30 June 2025, the Company and its subsidiaries
entitas anak memiliki 659 orang karyawan tetap had 659 permanent employees
(31 Desember 2024: 667 karyawan tetap) (tidak (31 December 2024: 667 permanent employees)
diaudit). (unaudited).
b. Penawaran umum saham biasa b. Public offering of ordinary shares
Berdasarkan Akta Notaris Aulia Taufani, S.H., Based on the Deed of Notary Aulia Taufani, S.H.,
No. 54 tanggal 15 Juni 2023 yang telah mendapat No. 54 dated 15 June 2023 which has received
persetujuan dari Kementerian Hukum dan Hak approval from the Ministry of Law and Human
Asasi Manusia Republik Indonesia dalam Surat Rights of the Republic of Indonesia in Decree
Keputusan AHU-0033656.AH.01.02.Tahun 2023 No. AHU-0033656.AH.01.02.Tahun 2023 dated
tanggal 16 Juni 2023, para pemegang saham 16 June 2023, the shareholders approved the
menyetujui perubahan dalam Anggaran Dasar changes in the Company's Articles of Association
Perusahaan mengubah nilai nominal masing- changing the nominal value of each of the
masing saham Perusahaan dari semula Company's shares from IDR1,000,000 – full
Rp1.000.000 – nilai penuh per lembar saham amount per share to become IDR150 – full amount
menjadi Rp150 – nilai penuh per lembar saham per share and the Company's authorised capital
dan modal dasar perseroan dari berjumlah from 30,000,000 shares to 500,000,000,000
30.000.000 lembar saham menjadi shares, as well as issued and paid-up capital from
500.000.000.000 lembar saham, serta modal yang 19,465,683 shares to 129,771,220,000 shares.
ditempatkan dan disetor dari 19.465.683 lembar
saham menjadi 129.771.220.000 lembar saham.
Pada tanggal 29 September 2023, Perusahaan On 29 September 2023, the Company received
memperoleh pemberitahuan efektif pernyataan notification on the effective registration statement
pendaftaran dari Dewan Komisioner Otoritas Jasa from the Board of Commissioners of the Financial
Keuangan (“OJK”) melalui surat Services Authority ("OJK") through letter
No. S-311/D.04/2023 untuk melakukan Penawaran No. S-311/D.04/2023 to conduct an Initial Public
Umum Perdana Saham Perusahaan. Pada tanggal Offering (“IPO”) of the Company's shares. On
9 Oktober 2023, saham tersebut telah dicatatkan 9 October 2023, these shares were listed on the
pada Bursa Efek Indonesia. Indonesia Stock Exchange.
Perusahaan menawarkan sebanyak The Company offered 4,015,000,000 shares with
4.015.000.000 lembar saham dengan harga par value of IDR150 – full amount per share, hence
nominal sebesar Rp150 – nilai penuh per lembar it increased its issued and fully paid capital by
saham sehingga menambah modal ditempatkan US$38,600.
dan disetor penuh sebesar AS$38.600.
Tambahan modal disetor terdiri dari selisih antara The additional paid-in capital consists of the
harga nominal saham sebesar Rp150 – nilai penuh difference between the share’s par value of IDR150
per lembar saham dan nilai transaksi atas – full amount per share and the transaction value of
Penawaran Umum Perdana Saham atau harga the IPO or offering price of IDR780 – full amount per
penawaran sebesar Rp780 – nilai penuh per share totalling US$162,118, less the share
lembar saham sebesar AS$162.118, dikurangi issuance costs amounting to US$3,178.
dengan biaya emisi saham sebesar AS$3.178.
Biaya emisi saham merupakan biaya transaksi Share issuance costs represent transaction costs
yang timbul dari aktivitas Penawaran Umum arising from the IPO, which includes registration
Saham Perdana, antara lain mencakup biaya fees and other regulatory fees, service fees paid to
pendaftaran dan biaya wajib lain, jasa yang legal counsel, accountants, and others.
dibayarkan kepada penasehat hukum, akuntan,
dan lain-lain.
7
Page 10
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
c. Struktur grup c. Group structure
Pada laporan keuangan konsolidasian ini, In these consolidated financial statements, the
Perusahaan dan entitas anak secara keseluruhan Company and its subsidiaries are collectively referred
dirujuk sebagai “Grup”. to as the “Group”.
Pada tanggal 30 Juni 2025 dan 31 Desember 2024 As at June 30, 2025 and December 31, 2024 the
entitas anak dari Grup adalah sebagai berikut: subsidiaries of the Group were as follows:
Persentase Pemilikan/ Jumlah aset sebelum eliminasi/
Percentage of ownership (%) Tahun Operasi Total assets before elimination
30 Juni/ 31 Desember/ Komersial/ 30 Juni/ 31 Desember/
Domisili/ June 30, December 31, Start of commercial June 30, December 31,
Entitas Anak/Subsidiaries Domicile 2025 2024 operations 2025 2024
Kepemilikan langsung/ Direct ownership
Star Energy Group Holdings Pte. Ltd ("SEGHPL") Singapura/ 100.00 100.00 2012 1,861,013 1,814,268
Singapore
PT Barito Wind Energy ("BWE") Indonesia 99.99 99.99 2023 153,265 143,253
Kepemilikan tidak langsung melalui SEGHPL dan entitas anak/Indirect ownership through SEGHPL and subsidiaries:
Star Energy Geothermal Pte. Ltd. ("SEGPL") Singapura/ 90.00 90.00 2005 765,604 709,241
Pemilikan tidak langsung melalui SEGHPL/ Singapore
Indirect ownership through SEGHPL
Star Energy Geothermal Netherlands B.V (Formerly Belanda/ 100.00 100.00 2016 453,089 436,009
Star Phoenix Geothermal JV B.V) ("SEG-NBV") Netherlands
Pemilikan tidak langsung melalui SEGHPL/
Indirect ownership through SEGHPL
Star Energy Geothermal Phillipines B.V Belanda/ 100.00 100.00 Tidak beroperasi/ 22 -
Pemilikan tidak langsung melalui SEGHPL/ Netherlands Dormant
Indirect ownership through SEGHPL
Star Energy Geothermal (Wayang Windu) Ltd ("SEG-WW") British Virgin 90.00 90.00 2000 823,224 806,317
Pemilikan tidak langsung melalui SEGPL/ Island
Indirect ownership through SEGPL
PT Star Energy Geothermal Halmahera Indonesia 85.50 85.50 Tahap eksplorasi/ 2,677 261
Pemilikan tidak langsung melalui SEGPL/ Exploration stage
Indirect ownership through SEGPL
Star Energy Geothermal Salak, Ltd. ("SEG-SL") Bermuda 80.91 80.91 1994 3,933,183 3,709,646
Pemilikan tidak langsung melalui SEGSDBV/
Indirect ownership through SEGSDBV
Star Energy Geothermal Salak Pratama, Ltd. Pulau Cayman/ 80.91 80.91 1997 2,198,357 2,051,125
Pemilikan tidak langsung melalui SEG-SL/ Cayman Island
Indirect ownership through SEG-SL
Star Energy Geothermal Darajat I, Limited ("SEGD-I") Persemakmuran 80.91 80.91 1994 564,389 550,008
Pemilikan tidak langsung melalui SEGSDBV/ Bahama/ Commonwealth
Indirect ownership through SEGSDBV Bahama
Star Energy Geothermal Darajat II, Limited ("SEGD-II") Bermuda 80.91 80.91 1994 904,927 887,736
Pemilikan tidak langsung melalui SEGSDBV/
Indirect ownership through SEGSDBV
PT Star Energy Geothermal Suoh Sekincau Indonesia 76.86 76.86 Tahap eksplorasi/ 1,465 1,271
Pemilikan tidak langsung melalui SEGSDBV/ Exploration stage
Indirect ownership through SEGSDBV
PT Star Energy Geothermal Indonesia Indonesia 85.50 85.50 2011 11,587 11,714
Pemilikan tidak langsung melalui SEGPL/
Indirect ownership through SEGPL
Star Energy Geothermal Holdings (Salak - Darajat) B.V. ("SEGHSD") Belanda/ 94.90 94.90 2016 906,577 871,684
Pemilikan tidak langsung melalui SEGPL dan SEG-NBV/ Netherlands
Indirect ownership through SEGPL and SEG-NBV
Star Energy Geothermal (Salak - Darajat) B.V. ("SEGSDBV") Belanda/ 80.91 80.91 2016 2,292,667 2,249,122
Pemilikan tidak langsung melalui SEGHSD/ Netherlands
Indirect ownership through SEGHSD
PT Darajat Geothermal Indonesia Indonesia 76.86 76.86 2000 44,314 42,934
Tidak langsung melalui SEGSDBV/
Indirect ownership through SEGSDBV
PT Star Energy Geothermal Drilling Services Indonesia 85.55 85.55 2023 21,162 18,378
Pemilikan tidak langsung melalui SEGPL dan SEGSDBV/
Indirect ownership through SEGPL and SEGSDBV
Kepemilikan tidak langsung melalui BWE/Indirect ownership through BWE:
PT Sidrap Bayu Energi Tahap Dua (sebelumnya/formerly Indonesia 50.99 50.99 Tahap eksplorasi/ 13,255 13,304
PT UPC Sidrap Bayu Energi Tahap Dua) ("SIDRAP2") Exploration stage
PT Sukabumi Bayu Energi (sebelumnya/formerly Indonesia 50.99 50.99 Tahap eksplorasi/ 7,465 8,038
PT UPC Sukabumi Bayu Energi) ("SUKABUMI") Exploration stage
PT Lombok Timur Bayu Energi (sebelumnya/formerly Indonesia 50.99 50.99 Tahap eksplorasi/ 2,422 2,448
PT UPC Lombok Timur Bayu Energi) ("LOMBOK") Exploration stage
PT UPC Sidrap Bayu Energi ("SBE") Indonesia 99.99 99.99 2018 132,167 135,246
PT Barito Wind Operation and Maintenance Indonesia (sebelumnya/ Indonesia 99.96 99.96 2018 159 145
formerly PT UPC Operation and Maintenance Indonesia) ("OMI")
8
Page 11
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Informasi singkat tentang entitas-entitas dalam Brief information on the entities within the Group is
Grup diuraikan di bawah ini: set out below:
SEGHPL SEGHPL
SEGHPL adalah perseroan terbatas yang didirikan SEGHPL is a limited liability company incorporated
dan berdomisili di Singapura. Aktivitas utama and domiciled in Singapore. The principal activity of
SEGHPL adalah melakukan investasi. SEGHPL is investment holding.
BWE BWE
Berdasarkan Akta Notaris No. 35 tanggal Based on Notarial Deed No. 35 dated
20 Oktober 2023, oleh Wiwik Condro, S.H., notaris 20 October 2023, by Wiwik Condro, S.H., a notary in
di Jakarta, Perusahaan dan SEGHPL mendirikan Jakarta, the Company and SEGHPL established a
BWE dengan modal dasar sejumlah company named BWE with total authorised capital
Rp62.400.000.000 – nilai penuh (atau setara amounted to IDR62,400,000,000 – full amount (or
dengan AS$4.000.000 – nilai penuh) terdiri dari equivalent to US$4,000,000 – full amount) consisting
40.000 lembar saham, dengan masing-masing of 40,000 shares with par value of IDR1,560,000 –
saham bernilai nominal Rp1.560.000 – nilai penuh full amount (or equivalent to US$100 – full amount).
(atau setara dengan AS$100 – nilai penuh). Dari From the authorised capital, the issued and paid-in
modal dasar tersebut, yang telah ditempatkan dan capital is 25% or equivalent to 10,000 shares
disetor penuh adalah sebesar 25% atau sejumlah amounted to IDR15,600,000,000 – full amount (or
10.000 lembar saham dengan nilai nominal equivalent to US$1,000,000 – full amount), with
sebesar Rp15.600.000.000 – nilai penuh (atau the Company as majority shareholder with 9,999
setara dengan AS$1.000.000 – nilai penuh), shares and SEGHPL holding 1 share. The deed
dengan Perusahaan sebagai pemegang saham was approved by the Minister of Law and
mayoritas dengan 9.999 lembar saham dan Human Rights through Decision Letter
SEGHPL memiliki 1 lembar saham. Akta tersebut No. AHU-0080578.AH.01.01.Tahun 2023 dated
telah disahkan oleh Menteri Hukum dan Hak 24 October 2023.
Asasi Manusia melalui Surat Keputusannya
No. AHU- 0080578.AH.01.01.Tahun 2023 tanggal
24 Oktober 2023.
BWE adalah perseroan terbatas yang didirikan dan BWE is a limited liability company incorporated and
berdomisili di Indonesia. Aktivitas utama BWE domiciled in Indonesia. The principal activity of BWE
adalah perusahaan induk investasi. is an investment holding entity.
Pada tanggal 14 Desember 2023, keputusan On 14 December 2023, a circular shareholder
sirkuler pemegang saham sebagai pengganti rapat resolution in lieu of the Company's extraordinary
umum pemegang saham luar biasa Perusahaan general meeting of shareholders approved and
menyetujui dan memutuskan perubahan atas decided changes in BWE’s Articles of Association
Anggaran Dasar BWE yang telah diresmikan which have been formalised through Notarial Deed
melalui Akta Notaris No. 71 tanggal No. 71 dated 15 December 2023, by Wiwik
15 Desember 2023, oleh Wiwik Condro, S. H., Condro, S. H., notary in Jakarta and approved by
notaris di Jakarta dan telah mendapatkan the Minister of Law and Human Rights of
persetujuan dari Menteri Hukum dan Hak Asasi the Republic of Indonesia through Decree
Manusia Republik Indonesia melalui Keputusan No. AHU-0079189.AH.01.02.Tahun 2023 dated
No. AHU-0079189.AH.01.02.Tahun 2023 tanggal 18 December 2023.
18 Desember 2023.
Perubahan tersebut antara lain: The changes included:
i. Penjualan saham BWE sejumlah satu lembar i. Sale of BWE shares in the amount of one share
saham dengan nilai nominal masing-masing with a nominal value of Rp1,560,000 – full
Rp1.560.000 – nilai penuh atau sama dengan amount each or equal to 0.01% of the entire
0,01% dari seluruh modal ditempatkan BWE issued capital of BWE from SEGHPL to PT Barito
dari SEGHPL kepada PT Barito Mitra Mitra Investama ("BMI"), an entity under common
Investama (“BMI”), entitas sepengendalian control with the Company.
dengan Perusahaan.
ii. Perubahan nilai nominal saham yang ii. Change in the nominal value of shares from
sebelumnya masing-masing saham bernilai previously each share having a nominal value
nominal Rp1.560.000 – nilai penuh atau of Rp1,560,000 – full amount or US$100 – full
AS$100 – nilai penuh menjadi Rp1.000.000 – amount to Rp1,000,000 – full amount.
nilai penuh.
9
Page 12
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
iii. Peningkatan modal dasar, ditempatkan dan iii. Increase in authorised, issued and paid-up
disetor BWE melalui penerbitan saham baru capital of BWE through the issuance of new
sehingga modal dasar menjadi sebesar shares so that the authorised capital becomes
Rp930.000.000.000 – nilai penuh dan modal Rp930,000,000,000 – full amount and issued
ditempatkan dan disetor penuh sebesar and fully paid-up capital of Rp465,000,000,000
Rp465.000.000.000 – nilai penuh. – full amount.
iv. Peningkatan modal dasar, ditempatkan dan iv. Increase in authorised, issued and paid-up
disetor BWE melalui penerbitan saham baru capital of BWE through the issuance of new
sehingga modal dasar menjadi sebesar shares so that the authorised capital becomes
Rp1.000.000.000.000 – nilai penuh dan modal Rp1,000,000,000,000 – full amount and issued
ditempatkan dan disetor penuh sebesar and fully paid-up capital of Rp962,389,000,000
Rp962.389.000.000 – nilai penuh. – full amount.
v. Susunan pemegang saham BWE menjadi v. The composition of BWE’s shareholders
sebagai berikut: becomes as follows:
Sebelum/Before Setelah/After
Jumlah saham/ Jumlah saham/
No. of shares IDR’000 No. of shares IDR’000
Modal ditempatkan dan
disetor/Issued and fully paid:
Perusahaan/Company 464.999 464.999.000 962.388 962.388.000
BMI 1 1.000 1 1.000
465.000 465.000.000 962.389 962.389.000
BWE adalah entitas induk dari: BWE is the immediate parent of:
PT Sidrap Bayu Energi Tahap Dua - sebelumnya PT Sidrap Bayu Energi Tahap Dua - formerly
PT UPC Sidrap Bayu Energi Tahap Dua PT UPC Sidrap Bayu Energi Tahap Dua
(“SIDRAP2”) (“SIDRAP2”)
PT Sukabumi Bayu Energi - sebelumnya PT Sukabumi Bayu Energi - formerly PT UPC
PT UPC Sukabumi Bayu Energi) ("SUKABUMI") Sukabumi Bayu Energi) ("SUKABUMI")
PT Lombok Timur Bayu Energi - sebelumnya PT Lombok Timur Bayu Energi - formerly
PT UPC Lombok Timur Bayu Energi) PT UPC Lombok Timur Bayu Energi)
("LOMBOK") ("LOMBOK")
PT UPC Sidrap Bayu Energi ("SBE") PT UPC Sidrap Bayu Energi ("SBE")
PT Barito Wind Operation and Maintenance PT Barito Wind Operation and Maintenance
Indonesia - sebelumnya PT UPC Operation and Indonesia - formerly PT UPC Operation and
Maintenance Indonesia) ("OMI") Maintenance Indonesia) ("OMI")
PT UPC Sidrap Bayu Energi ("SBE") PT UPC Sidrap Bayu Energi ("SBE")
SBE didirikan dengan akta notaris Mala Mukti SH, SBE was established based on Notarial Deed No. 71
LLM, No. 71 tanggal 25 Februari 2013 di Jakarta. dated 25 February 2013 of Notary Mala Mukti, S.H.,
Akta pendirian disetujui oleh Kementerian Hukum LL.M., a public notary in Jakarta. The Deed of
dan Hak Asasi Manusia Republik Indonesia Establishment was approved by the Ministry of
(“Menkumham”) dalam surat keputusannya Law and Human Rights of the Republic of Indonesia
No. AHU-16472.AH.01.01. Tahun 2013, tanggal (the “MOLHR”) in Decision Letter
2 April 2013 dan diumumkan dalam Berita Negara No. AHU-16472.AH.01.01. Tahun 2013, dated
Republik Indonesia No. 72 tanggal 6 September April 2, 2013 and was published in State Gazette of
2013, Tambahan No. 90048. the Republic of Indonesia No. 72 dated
6 September 2013, supplement No. 90048.
SBE saat ini mengoperasikan pembangkit listrik SBE currently operates a 75 megawatts (“MW”)
tenaga angin 75 megawatts (“MW”) berdasarkan wind-powered electricity plant under a Power
Power Purchase Agreement (“PPA”) dengan Purchase Agreement (“PPA”) with PT Perusahaan
PT Perusahaan Listrik Negara (Persero) (“PLN”) Listrik Negara (Persero) (“PLN”) for a period of
untuk periode selama 30 tahun dari tanggal 5 April 30 years from 5 April 2018.
2018.
10
Page 13
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Star Energy Geothermal Pte. Ltd. (“SEGPL”) Star Energy Geothermal Pte. Ltd. (“SEGPL”)
SEGPL adalah perseroan terbatas yang didirikan SEGPL is a limited liability company incorporated
dan berdomisili di Singapura. Aktivitas utama and domiciled in Singapore. The principal activity of
SEGPL adalah melakukan investasi. SEGPL is investment holding.
Star Energy Geothermal Netherlands B.V. Star Energy Geothermal Netherlands B.V.
(“SEGNBV”) dan Star Energy Geothermal (“SEGNBV”) and Star Energy Geothermal
Philippines B.V. (“SEG Philippines”) Philippines B.V. (“SEG Philippines”)
SEGNBV dan SEG Philippines didirikan pada SEGNBV and SEG Philippines were incorporated in
Desember 2016 di Belanda. Aktivitas utama December 2016 in the Netherlands. The principal
SEGNBV dan SEG Philippines adalah melakukan activity of SEGNBV and SEG Philippines is
investasi. investment holding.
Star Energy Geothermal (Wayang Windu) Ltd. Star Energy Geothermal (Wayang Windu) Ltd.
(“SEGWWL”) (“SEGWWL”)
Joint Operation Contract (“JOC”) Joint Operation Contract (“JOC”)
Kegiatan utama SEGWWL adalah untuk The principal activity of SEGWWL is to operate a
mengoperasikan area sumber energi panas bumi geothermal energy resource area on the island of
di pulau Jawa, Indonesia berdasarkan JOC Java in Indonesia under a JOC dated 2 December
tertanggal 2 Desember 1994, dengan Perusahaan 1994 with Perusahaan Pertambangan Minyak dan
Pertambangan Minyak dan Gas Bumi Negara Gas Bumi Negara (“PERTAMINA”), the Indonesian
(“PERTAMINA”), perusahaan minyak dan gas milik state-owned oil and natural gas corporation.
Negara Indonesia.
Jangka waktu JOC adalah 42 tahun, mulai dari The term of the JOC is 42 years, beginning on
2 Desember 1994. Periode produksi (“masa 2 December 1994. The production period (the
pakai”) untuk setiap unit produksi tenaga listrik “generation term’’) for each power production unit is
adalah 30 tahun terhitung sejak unit pertama 30 years commencing on the date the first unit began
beroperasi secara komersial. Masa ini dapat to operate commercially. This term may be extended
diperpanjang hingga akhir masa JOC apabila to the end of the term of the JOC if the generation
masa pakainya diakhiri sebelum masa kontrak term concludes prior to the JOC contract term. The
JOC. 110 MW unit pertama (Unit 1) mulai first 110 MW Unit (Unit 1) commenced commercial
beroperasi secara komersial pada tanggal 8 Juni operation on 8 June 2000 and was subsequently
2000 dan yang selanjutnya meningkat menjadi increased to 113.5 MW. The second 117 MW Unit
113,5 MW. Unit kedua 117 MW (Unit 2) mulai (Unit 2) commenced commercial operation in March
beroperasi secara komersial pada Maret 2009. 2009. SEGWWL commenced development
SEGWWL telah memulai kegiatan pembangunan activities for the third Unit (Unit 3) and as of the date
unit ketiga (Unit 3) dan sampai dengan tanggal of these consolidated financial statements,
laporan keuangan konsolidasian ini, manajemen management is still in the process of obtaining pre-
masih dalam proses untuk mendapatkan Final Investment Decision (“FID”) approval from the
persetujuan Final Investment Decision (“FID”) dari Board of Directors.
Direksi.
Pada tanggal 12 Maret 2007, PERTAMINA telah On 12 March 2007, PERTAMINA transferred its
mengalihkan hak dan kewajibannya terkait rights and obligations related to geothermal activities
kegiatan panas bumi kepada anak to its subsidiary, PT Pertamina Geothermal Energy
perusahaannya, PT Pertamina Geothermal Energy (“PGE”). This transfer was subsequently
(“PGE”). Pengalihan ini kemudian didokumentasikan documented in the Second Amendment of the
dalam Amendemen Kedua atas JOC Wayang Wayang Windu JOC (“JOC 2nd amendment”) dated
Windu (“Amendemen kedua JOC”) tertanggal 27 June 2016.
27 Juni 2016.
Syarat-syarat utama JOC adalah sebagai berikut: The principal terms of the JOC are as follows:
i. Manajemen operasi i. Management of operations
PGE memiliki hak dan tanggung jawab untuk PGE shall have the right and responsibility to
mengelola sumber daya panas bumi. manage the geothermal resources. SEGWWL
SEGWWL menanggung risiko dan bears the risk and is responsible for the conduct
bertanggung jawab atas pelaksanaan kegiatan of the geothermal operations and shall finance
operasional panas bumi dan harus membiayai the expenditures for the geothermal operations.
pengeluaran untuk kegiatan operasional panas
bumi tersebut.
11
Page 14
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
ii. Kepemilikan material dan peralatan ii. Ownership of materials and equipment
Bahan dan peralatan yang dibeli oleh Materials and equipment purchased by
SEGWWL dan digunakan dalam fasilitas SEGWWL and incorporated into the field facilities
lapangan dan hak atas tanah, bergantung pada and land rights, subject to liens in favour of
hak gadai kreditur, akan menjadi hak milik PGE lenders, shall become the property of PGE when
saat pembangunan fasilitas tersebut selesai. the construction of such facilities has been
PGE memberikan SEGWWL hak eksklusif completed. PGE has granted SEGWWL an
selama jangka waktu JOC untuk exclusive and irrevocable right during the term of
menggunakan, antara lain, fasilitas lapangan the JOC to use, among other things, the field
untuk operasi energi panas bumi. Oleh karena facilities for geothermal operations. As SEGWWL
SEGWWL telah membayar dan mempunyai has paid for and has the right to use such
hak untuk menggunakan aset tersebut, harga property, the costs of these assets have been
perolehan atas aset-aset tersebut dicatat recorded as assets in SEGWWL’s financial
sebagai aset dalam laporan keuangan statements. Electricity generating facilities shall
SEGWWL. Fasilitas pembangkit harus tetap remain the property of SEGWWL. Electricity
menjadi milik SEGWWL. Fasilitas pembangkit generating facilities may be transferred or sold to
listrik dapat dialihkan atau dijual ke PGE pada PGE at the termination of the JOC contract term.
saat berakhirnya jangka waktu kontrak JOC.
iii. Pajak penghasilan badan iii. Corporate income tax
Kontraktor JOC tunduk pada Keputusan A joint operation contractor is subject to
Presiden No. 49 tahun 1991, yang memberikan Presidential Decree No. 49 of 1991, which
tarif pajak inklusif pada kontraktor sebesar 34% provides the contractor with an all-inclusive tax
dari laba bersih operasional, sebagaimana rate of 34% of net operating income as defined in
didefinisikan dalam Undang-Undang Pajak the 1984 Indonesian Income Tax Law. In certain
Penghasilan Indonesia Tahun 1984. Dalam government regulations, this 34% is referred to
peraturan pemerintah tertentu, 34% tersebut as the “Government share”.
disebut sebagai “bagian Pemerintah”.
SBE beroperasi berdasarkan peraturan pajak SBE operates under the tax regulations in
di Indonesia. Pertimbangan yang signifikan Indonesia. Significant judgement is required in
diperlukan dalam menentukan ketentuan untuk determining the provision for income tax and
pajak penghasilan dan pajak lainnya, other taxes, recoverability of claims for tax
pemulihan klaim pengembalian pajak, dan refunds and recognition of deferred tax assets.
pengakuan aset pajak tangguhan. Jika hasil Where the final tax outcome of these matters is
pajak akhir dari klaim tersebut berbeda dari different from the amounts that were initially
jumlah yang awalnya dicatat, perbedaan recorded, such differences will be recorded in
tersebut akan dicatat dalam laba rugi pada profit or loss in the period in which such a
periode saat penentuan tersebut dilakukan. determination is made.
iv. Penyisihan produksi iv. Production allowance
Kontraktor JOC diharuskan membayar The JOC contractor is required to pay PGE a
penyisihan produksi kepada PGE setara production allowance equivalent to 4% of net
dengan 4% dari laba bersih operasional, operating income, calculated based on the 1984
dihitung berdasarkan Undang-Undang Pajak Indonesian Income Tax Law. The PGE
Penghasilan Indonesia Tahun 1984. Production Allowance represents a royalty fee
Tunjangan Produksi PGE merupakan biaya paid to PGE. This charge is tax deductible
royalti yang dibayarkan kepada PGE. Biaya ini therefore it is accounted for as an expense in the
dapat dikurangkan dari pajak sehingga dicatat consolidated statements of profit or loss and
sebagai beban dalam laporan laba rugi dan other comprehensive income.
penghasilan komprehensif lain konsolidasian.
Energy Sales Contract (“ESC”) Energy Sales Contract (“ESC”)
Sehubungan dengan JOC antara SEGWWL In conjunction with SEGWWL entering into the JOC
dengan PERTAMINA, maka kedua pihak sepakat with PERTAMINA, both PERTAMINA and
untuk membuat ESC dengan PLN, dimana PLN SEGWWL entered into an ESC with PLN whereby
telah menyetujui untuk membeli listrik yang PLN has agreed to purchase electricity output which
dihasilkan dan dikirim oleh SEGWWL kepada PLN is delivered by SEGWWL to PLN on behalf of
atas nama PERTAMINA untuk jangka waktu PERTAMINA for 30 years commencing on the date
30 tahun, dimulai dari tanggal komersial hingga of commercial generation, up to a maximum
mencapai kapasitas pembangkit maksimum aggregate generating capacity of 400 MW.
sebesar 400 MW.
12
Page 15
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
ESC mengatur pembayaran energi yang dihitung The ESC provides for a United States Dollar
dalam satuan Dolar Amerika Serikat berdasarkan calculated energy payment based on deliverable
jam kilowatt (“kWh”) yang dapat dikirim pada harga kilowatt hour (“kWh”) at a base energy price, as
energi dasar, yang disesuaikan dengan inflasi. adjusted for inflation. The ESC is supported by
ESC didukung oleh surat dukungan dari letters of support from the Ministry of Energy and
Kementerian Energi dan Sumber Daya Mineral Mineral Resources (“MoEMR”) and the Ministry of
(“ESDM”) serta Kementerian Keuangan Finance (“MoF”) of the Republic of Indonesia.
(“Kemenkeu”) Republik Indonesia.
Setelah amendemen pertama ESC, PERTAMINA After the first amendment of the ESC, PERTAMINA
menginstruksikan PLN untuk membayar semua instructed PLN to pay all amounts directly to
jumlah langsung ke SEGWWL dalam waktu 30 hari SEGWWL within 30 days of receipt of an invoice, for
sejak diterimanya tagihan, untuk listrik yang dikirim the electricity delivered or made available by
atau disediakan oleh SEGWWL ke PLN, SEGWWL to PLN, based upon the pricing formula
berdasarkan formula harga yang tercantum dalam stated in the ESC amendment. PLN agrees to send
amendemen ESC. PLN setuju untuk mengirimkan to PERTAMINA a copy of the funds transfer order
kepada PERTAMINA salinan perintah transfer relevant to the payment made. The invoice is stated
dana yang relevan dengan pembayaran yang and payable in United States Dollars (“US$”).
dilakukan. Faktur dinyatakan dan harus dibayar
dalam Dolar Amerika Serikat (“AS$”).
Setiap jumlah berdasarkan kontrak yang tidak Any amount under the contract not paid by PLN
dibayar oleh PLN pada saat jatuh tempo akan when due shall accrue interest from the date due at
menimbulkan bunga sejak tanggal jatuh tempo a per annum interest rate equal to the three months
dengan tingkat bunga per tahun sama dengan LIBOR deposit rate (as the rate is changed from time
tingkat suku bunga deposito LIBOR tiga bulan to time) plus 3%, calculated and compounded
(sebagaimana tingkat tersebut berubah dari waktu monthly until such amounts are paid.
ke waktu) ditambah 3%, dihitung dan
dimajemukkan setiap bulan sampai jumlah
tersebut dibayarkan.
Sesuai dengan ketentuan ESC, PLN harus In accordance with the terms of the ESC, PLN shall
membayar kapasitas minimum berdasarkan pay a minimum capacity payment based on the unit
kapasitas tarif unit dan faktor pendukung dari rated capacity and the availability factor of each unit,
setiap unit, selama SEGWWL dapat menyediakan as long as SEGWWL can supply and generate
listrik pada tingkat yang telah ditentukan. energy at the minimum specified levels.
Efektif tanggal 21 November 2006, SEGWWL, Effective on 21 November 2006, SEGWWL, PLN
PLN dan PERTAMINA melakukan perubahan atas and PERTAMINA amended the Wayang Windu
Wayang Windu Geothermal ESC (“Amendemen Geothermal ESC (“ESC 1st Amendment”).
pertama ESC”).
Pada tanggal 27 Juni 2016, SEGWWL, PLN dan On 27 June 2016, SEGWWL, PLN and
PERTAMINA menandatangani Amendemen PERTAMINA signed the Second Amendment of the
kedua dari ESC Wayang Windu (“Amendemen Wayang Windu ESC (“ESC 2nd amendment”),
kedua ESC”) yang berlaku efektif tanggal effective on 5 April 2016.
5 April 2016.
Berdasarkan Amendemen pertama dan kedua Under the ESC first and second amendments, the
ESC, tarif listrik telah direvisi menjadi: electricity tariff has been revised as follows:
ESC Awal/Original ESC AS$0,04638/kWh x indeks inflasi + tingkat kapasitas dasar bulanan(1)/
US$0.04638/kWh x inflation index + monthly base capacity rate(1)
Amendemen pertama ESC/ AS$0,04940/kWh x indeks eskalasi(3)/
ESC 1st amendment US$0.04940/kWh x escalation index(3)
Amendemen kedua ESC/ AS$0,04940/kWh x indeks eskalasi(3) + tarif tambahan tetap delta(2)/
ESC 2nd amendment US$0.04940/kWh x escalation index(3) + additional flat delta tariff(2)
(1) (1)
tingkat kapasitas dasar bulanan AS$329,5 – nilai monthly base capacity rate of US$329.5 – full amount
penuh per kilowatt-tahun. per kilowatt-year.
(2) (2)
tarif tambahan tetap delta AS$0,031105/kWh – additional flat delta tariff of US$0.031105/kWh –
nilai penuh. full amount.
13
Page 16
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
(3) (3)
indeks eskalasi akan berlaku selama 264 bulan escalation index shall apply for 264 months from the
sejak tanggal pembangkitan komersial dari date of commercial generation of the respective
masing-masing perangkat turbin-generator dan turbine-generator set and its related equipment and
peralatan serta fasilitas terkait yang diperlukan facilities required for generating of electricity from
untuk menghasilkan listrik dari energi panas geothermal energy. Based on Side Agreement
bumi. Berdasarkan Side Agreement tanggal dated 28 February 2023, a flat escalation index for
28 Februari 2023, indeks eskalasi tetap untuk Unit 1 of US$0.10589/kWh is applicable since 9
Unit 1 sebesar AS$0,10589/kWh berlaku sejak June 2022 and for Unit 2 shall be calculated based
9 Juni 2022 dan untuk Unit 2 akan dihitung on the latest escalation index as of February 2031
berdasarkan indeks eskalasi terbaru per which will be applicable from 3 March 2031.
Februari 2031 yang akan berlaku mulai
3 Maret 2031.
PT Star Energy Geothermal Indonesia (“PT SEGI”) PT Star Energy Geothermal Indonesia (“PT SEGI”)
PT SEGI didirikan tanggal 4 Februari 2011 dengan PT SEGI was incorporated on 4 February 2011
nama PT Pakar Usaha Sejati. Sebelumnya, under the name PT Pakar Usaha Sejati. It was
PT SEGI dimiliki oleh PT Artha Sarana Karya dan previously owned by PT Artha Sarana Karya and
PT Sarana Karya Mandiri (“PT SKM”) sebelum PT Sarana Karya Mandiri (“PT SKM”) before SEGPL
99% kepemilikannya diakuisisi oleh SEGPL. acquired 99% ownership interest. The remaining 1%
Selanjutnya, sisa 1% dimiliki oleh PT SKM. Adapun was owned by PT SKM. PT SEGI’s main business
kegiatan usaha utama PT SEGI adalah activities are to provide management consultation
memberikan jasa konsultasi manajemen. services.
Pada tanggal 15 Februari 2019, PT SEGI On 15 February 2019, PT SEGI changed its
mengubah pemegang sahamnya dari PT SKM shareholder from PT SKM to Barito Pacific and
menjadi Barito Pacific dan menerbitkan saham issued additional shares. The shareholder structure
tambahan. Komposisi pemegang saham adalah is as follows:
sebagai berikut:
Sebelum/Before Setelah/After
Jumlah saham/ Jumlah saham/
No. of shares IDR’000 No. of shares IDR’000
Modal ditempatkan dan disetor/
Issued and fully paid:
SEGPL 108.900 10.890.000 108.900 10.890.000
PT SKM 1.100 110.000 - -
Barito Pacific - - 5.732 573.200
110.000 11.000.000 114.632 11.463.200
PT Star Energy Geothermal Halmahera PT Star Energy Geothermal Halmahera
(“PT SEGH”) (“PT SEGH”)
PT SEGH didirikan dengan nama PT Bintang PT SEGH was incorporated under the name
Andalan Prasadana, di mana pada tanggal PT Bintang Andalan Prasadana, and on
30 Maret 2009, namanya berubah menjadi 30 March 2009, it changed its name to PT SEGH.
PT SEGH. Pada tanggal 9 Desember 2009, On 9 December 2009, PT SEGH obtained a licence
PT SEGH memperoleh izin untuk mengeksplorasi to explore the Jailolo area from the Regency of
area Jailolo dari Bupati Halmahera Barat. Halmahera Barat. On 15 October 2012, SEGPL
Selanjutnya, pada tanggal 15 Oktober 2012, acquired 95% ownership interest in PT SEGH from
SEGPL mengakuisisi 95% kepemilikan saham PT Star Energy Investment (“PT SEI”) and
PT SEGH dari PT Star Energy Investment PT Tritunggal Artha Unggul. Subsequently, in
(“PT SEI”) dan PT Tritunggal Artha Unggul. Pada January 2013, the Ministry of Justice and Human
bulan Januari 2013, Kementerian Kehakiman dan Rights approved the increase in share capital in
Hak Asasi Manusia menyetujui peningkatan modal PT SEGH from IDR25,000,000 – full amount to
saham PT SEGH dari Rp25.000.000 – nilai penuh IDR10,000,000,000 – full amount. SEGPL injected
menjadi Rp10.000.000.000 – nilai penuh. SEGPL additional capital to maintain its 95% ownership
menyetorkan modal tambahan untuk interest.
mempertahankan 95% kepemilikannya.
Pada tanggal 17 Februari 2017, PT SEGH On 17 February 2017, PT SEGH received a decision
menerima surat keputusan dari Kementerian letter from the MoEMR in response to PT SEGH’s
ESDM yang menanggapi permohonan PT SEGH request to return the concession to the Government
untuk mengembalikan konsesi tersebut kepada of Indonesia (“GOI”). On 3 March 2017, the MoEMR
Pemerintah Indonesia. Pada tanggal 3 Maret 2017, approved the request to return the concession.
Kementerian ESDM menyetujui permintaan
pengembalian konsesi.
14
Page 17
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Pada tanggal 15 Februari 2019, PT SEGH On 15 February 2019, PT SEGH changed its
mengubah pemegang sahamnya dari PT SEI shareholder from PT SEI to Barito Pacific. The
menjadi Barito Pacific. Komposisi pemegang shareholders structure of PT SEGH is as follows:
saham PT SEGH adalah sebagai berikut:
Sebelum/Before Setelah/After
Jumlah saham/ Jumlah saham/
No. of shares IDR’000 No. of shares IDR’000
Modal ditempatkan dan disetor/
Issued and fully paid:
SEGPL 95.000 9.500.000 95.000 9.500.000
PT SEI 5.000 500.000 - -
Barito Pacific - - 5.000 500.000
100.000 10.000.000 100.000 10.000.000
Star Energy Geothermal Holdings (Salak-Darajat) Star Energy Geothermal Holdings (Salak-Darajat)
B.V (“Holdings B.V.”) B.V (“Holdings B.V.”)
Holdings B.V. didirikan pada tanggal Holdings B.V. was incorporated on
15 Desember 2016 dan memegang 80,20% 15 December 2016 and has 80.20% ownership
kepemilikan di Star Energy Geothermal (Salak- interest in Star Energy Geothermal (Salak-Darajat)
Darajat) B.V. (“SEG-SD B.V.”). B.V. (“SEG-SD B.V.”).
Star Energy Geothermal (Salak-Darajat) B.V. (“SEG- Star Energy Geothermal (Salak-Darajat) B.V.
SD B.V.”) (“SEG-SD B.V.”)
SEG-SD B.V. didirikan pada tanggal SEG-SD B.V. was incorporated on
16 Desember 2016 dengan penerbitan 10.000 16 December 2016 with 10,000 issued shares of
lembar saham bernilai nominal AS$1 per lembarnya. US$1 each. SEG-SD B.V. is the immediate parent
SEG-SD B.V. adalah entitas induk dari: of:
Star Energy Geothermal Salak, Ltd. (“SEGSL”) Star Energy Geothermal Salak, Ltd. (“SEGSL”)
- sebelumnya Chevron Geothermal Salak, Ltd. - formerly known as Chevron Geothermal
(“CGS”) Salak, Ltd. (“CGS”)
Star Energy Geothermal Darajat I, Limited Star Energy Geothermal Darajat I, Limited
(“SEGD-I”) - sebelumnya Chevron Darajat Ltd. (“SEGD-I”) - formerly known as Chevron
(“CDL”) Darajat Ltd. (“CDL”)
Star Energy Geothermal Darajat II, Limited Star Energy Geothermal Darajat II, Limited
(“SEGD-II”) - sebelumnya Chevron Geothermal (“SEGD-II”) - formerly known as Chevron
Indonesia, Ltd. (“CGI”) Geothermal Indonesia, Ltd. (“CGI”)
PT Star Energy Geothermal Suoh Sekincau PT Star Energy Geothermal Suoh Sekincau
(“PT SEGSS”) - sebelumnya PT Chevron (“PT SEGSS”) - formerly known as PT Chevron
Geothermal Suoh Sekincau Geothermal Suoh Sekincau
PT Darajat Geothermal Indonesia (“PT DGI”) PT Darajat Geothermal Indonesia (“PT DGI”)
Star Energy Geothermal Darajat II, Limited (“SEGD- Star Energy Geothermal Darajat II, Limited (“SEGD-
II”); Star Energy Geothermal Darajat I, Limited II”); Star Energy Geothermal Darajat I, Limited
(“SEGD-I”); dan PT Darajat Geothermal Indonesia (“SEGD-I”); and PT Darajat Geothermal Indonesia
(“PT DGI”) – semuanya sebagai Darajat Geothermal (“PT DGI”) - together the Darajat Geothermal
Operation West Java Joint Operation Contractor Operation West Java Joint Operation Contractor
Group (“Kelompok Kontraktor Darajat” atau Group (the “Darajat Contractor Group” or “SEGDL”)
“SEGDL”)
SEGD-I didirikan berdasarkan sertifikat pendirian SEGD-I was incorporated based on a certificate of
dari J.O. Liddell, notaris publik dari Persemakmuran incorporation of J.O. Liddell, public notary of the
Bahama tertanggal 21 Juni 1984 berdasarkan Commonwealth of Bahamas Island dated
Undang-Undang Bahama dengan lokasi usaha 21 June 1984 under the Laws of the Bahamas with
utama di Indonesia. Pada tanggal 31 Maret 2017, its principal place of business in Indonesia. It
namanya diubah menjadi SEGD-I setelah diakuisisi changed its name to SEGD-I on 31 March 2017 after
oleh SEG-SD B.V., yang merupakan bagian dari its acquisition by SEG-SD B.V. as part of a sale and
perjanjian jual dan beli tertanggal 22 Desember 2016 purchase agreement on 22 December 2016
antara Chevron Corporation (“CVX”) dan Star between Chevron Corporation (“CVX”) and the Star
Energy Consortium dengan tujuan untuk menjual Energy Consortium to sell CVX’s Indonesian
aset panas bumi CVX Indonesia. geothermal assets.
15
Page 18
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
SEGD-II adalah perusahaan Bermuda, yang dahulu SEGD-II is a Bermuda corporation that was
didirikan dengan nama Texaco Darajat, Ltd. incorporated under the name Texaco Darajat, Ltd.
berdasarkan sertifikat pendirian tertanggal based on a certificate of incorporation dated
10 Januari 1984 berdasarkan hukum Bermuda, 10 January 1984 under the Laws of Bermuda, with
dengan kegiatan usaha utama di Indonesia. its principal place of business in Indonesia. It
Selanjutnya, pada tanggal 14 November 2005, changed its name to CGI on 14 November 2005. On
namanya diubah menjadi CGI. Pada tanggal 31 March 2017, CGI was fully acquired by SEG-SD
31 Maret 2017, CGI diakuisisi sepenuhnya oleh B.V. and changed its name to SEGD-II.
SEG-SD B.V. dan namanya diubah menjadi SEGD-II.
Pada tanggal 26 Februari 1997, PT DGI didirikan PT DGI was established by Deed No. 160 of Notary
dengan Akta No. 160 dari Notaris Sutjipto, S.H. Akta Sutjipto, S.H., dated 26 February 1997. The deed of
pendirian tersebut telah mendapat persetujuan dari establishment was approved by the Minister of Law
Menteri Hukum dan Hak Asasi Manusia Republik and Human Rights of the Republic of Indonesia in
Indonesia dengan surat keputusan No. C2- his decision letter No.C2-5403.HT.01.01.TH.97
5403.HT.01.01.TH.97 tertanggal 24 Juni 1997 dan dated 24 June 1997 and was published in State
telah diumumkan dalam Berita Negara Republik Gazette of the Republic of Indonesia No. 39 dated
Indonesia No. 39 tertanggal 15 Mei 1998, tambahan 15 May 1998, supplement No. 2609. On
No. 2609. Pada tanggal 27 September 2017, 95% 27 September 2017, 95% ownership of PT DGI was
kepemilikan PT DGI diakuisisi oleh SEG-SD B.V. acquired by SEG-SD B.V.
JOC Darajat Darajat JOC
SEGD-II dan SEGD-I mengadakan JOC tertanggal SEGD-II and SEGD-I, entered into a JOC dated
16 November 1984 yang telah diubah pada tanggal 16 November 1984 as amended on 16 November
16 November 1988, 15 Januari 1996 dan 7 Februari 1988, 15 January 1996 and 7 February 2003 with
2003 dengan PERTAMINA, di mana kegiatan PERTAMINA for which geothermal operations are
operasional panas bumi sekarang dikelola oleh now managed by PGE, a subsidiary of
PGE, anak perusahaan dari PERTAMINA. JOC PERTAMINA. The JOC provides the exploration and
mengatur eksplorasi dan eksploitasi sumber energi exploitation rights for geothermal energy resources
panas bumi di wilayah sekitar 49,98 kilometer in an area of approximately 49.98 square kilometres
persegi (setara dengan 4.998 hektar) di lapangan (equivalent to 4,998 hectares) in the Darajat
panas bumi Darajat, Jawa Barat, serta pembangkit geothermal field, West Java, as well as the
listrik dari sumber daya tersebut dan penjualan generation of electricity from those resources and
energi panas bumi dan listrik tersebut ke PLN, the sale of such geothermal energy and electricity to
melalui PGE, sesuai dengan ESC. PLN through PGE, pursuant to an ESC.
Jangka waktu JOC adalah 564 bulan terhitung sejak The term of the JOC is 564 months commencing
16 November 1984 dengan ketentuan bahwa jika from 16 November 1984, provided that if a
suatu masa produksi dengan periode 360 bulan production period of 360 months for any unit is not
untuk suatu unit apapun tidak memungkinkan untuk possible within the period ending 564 months
diselesaikan hingga periode 564 bulan berakhir following the effective date, then an extension period
terhitung sejak tanggal efektif, maka perpanjangan will be added to the term of the JOC as it pertains to
periode akan ditambahkan ke dalam jangka waktu that unit only to enable the supply of geothermal
JOC selama hal tersebut hanya berkenaan dengan energy (as defined in the JOC) to such unit for a
pengadaan energi panas bumi (sebagaimana production period of 360 months.
didefinisikan dalam JOC) untuk unit tersebut dalam
periode produksi 360 bulan.
Amendemen No. 1 atas JOC Darajat (“Darajat Amendment No.1 to the Darajat JOC (“Darajat
Amended and Restated JOC”) pada tanggal Amended and Restated JOC”) dated 7 February
7 Februari 2003, menyatakan bahwa: 2003 states that:
Dalam hal PLN atau Kelompok Kontraktor In the event that either PLN or the Darajat
Darajat menjalankan opsi yang diberikan untuk Contractor Group exercises the option granted
memperpanjang masa produksi dari 360 to extend the production period from 360 to 480
menjadi 480 bulan, maka periode produksi juga months, the production period shall be
harus diubah secara otomatis dari 360 menjadi automatically amended from 360 to 480
480 bulan. months.
Selanjutnya, dalam hal PLN atau Kelompok Furthermore, in the event that either PLN or the
Kontraktor Darajat menjalankan opsi yang Darajat Contractor Group exercises the option
diberikan untuk memperpanjang jangka waktu granted to extend the ESC term from 432 to 552
ESC dari 432 menjadi 552 bulan, maka jangka months, the term of the JOC shall be
waktu JOC harus diubah secara otomatis dari automatically amended from 564 to 684 months
564 menjadi 684 bulan dari tanggal from 16 November 1984.
16 November 1984.
16
Page 19
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Jika periode produksi melampaui batas waktu If the production period extends beyond the
sebagaimana tertera dalam Amended and term of the Darajat Amended and Restated
Restated JOC, maka jangka waktu JOC secara JOC, the JOC term will automatically be
otomatis akan diperpanjang sampai dengan extended to coincide with the end of the
akhir periode produksi. production period.
Pada tanggal 22 September 2020, Kelompok On 22 September 2020, the Darajat Contractor
Kontraktor Darajat telah melaksanakan hak/opsinya Group has exercised its right/option to amend the
untuk mengubah jangka waktu JOC dan masa term of the JOC and the production period as stated
produksi sebagaimana tercantum dalam Darajat in the Darajat Amended and Restated JOC,
Amended and Restated JOC, sehingga jangka therefore the JOC term was extended up to
waktu JOC diperpanjang hingga 16 November 2041 16 November 2041 for units 1 and 2, and
untuk unit 1 dan 2, dan 11 Mei 2047 untuk unit 3. 11 May 2047 for unit 3.
JOC Darajat tunduk pada Keputusan Presiden The Darajat JOC is subject to Presidential Decree
No. 49 tahun 1991 dan Keputusan Menteri No. 49 of 1991 and the Minister of Finance Decree
Keuangan No. 766/1992 yang memberikan tarif No. 766/1992 which provides the Darajat Contractor
pajak inklusif pada Kelompok Kontraktor Darajat Group with an all-inclusive tax rate of 34% of net
sebesar 34% dari laba bersih operasional, operating income as defined in the JOC and the
sebagaimana didefinisikan dalam JOC dan Undang- 1984 Indonesian Income Tax Law. In certain
Undang Pajak Penghasilan Indonesia Tahun 1984. government regulations, this 34% is referred to as
Dalam peraturan pemerintah tertentu, 34% tersebut the “Government share”.
disebut sebagai “bagian Pemerintah”.
Selain itu, Kelompok Kontraktor Darajat diharuskan The Darajat Contractor Group is also required to pay
membayar penyisihan produksi untuk PGE setara the PGE production allowance equivalent to 2.66%
dengan 2,66% dari laba bersih operasional, dihitung of net operating income calculated based on the
berdasarkan Undang-Undang Pajak Penghasilan 1984 Indonesian Income Tax Law. The PGE
Indonesia Tahun 1984. Beban ini dapat dikurangkan production allowance represents a royalty fee paid
dari pajak; oleh karenanya dicatat sebagai beban to PGE. This charge is tax deductible; therefore, it is
dalam laba rugi. accounted for as an expense in profit or loss.
Berdasarkan JOC Darajat, biaya atau pengeluaran Based on the Darajat JOC, costs or expenses that
yang dapat dikurangkan dari pendapatan kotor are deductible from gross income (defined as all
(didefinisikan sebagai semua jumlah yang amounts paid to or accrued by the Darajat
dibayarkan atau diperoleh oleh Kelompok Kontraktor Contractor Group) and incurred by the Darajat
Darajat) dan dikeluarkan oleh Kelompok Kontraktor Contractor Group prior to the date of first operation
Darajat sebelum tanggal operasi pertama untuk unit for the initial unit shall be a deduction from gross
awal adalah pengurangan dari pendapatan kotor income in the year of the date of first operation. Any
pada tahun tanggal operasi pertama. Setiap losses incurred in the year of the date of first
kerugian yang timbul pada tahun tanggal operasi operation may be credited against income in the
pertama dapat dikreditkan terhadap pendapatan succeeding eight years. In the event a loss is
dalam delapan tahun berikutnya. Jika suatu kerugian incurred in any year commencing after the date of
terjadi pada tahun mana pun yang dimulai setelah first operation, that loss shall become an “Eight Year
tanggal operasi pertama, kerugian tersebut akan Loss Carry Forward” and may be deducted in whole
menjadi “Kerugian yang Dibawa ke Depan Delapan or in part from net income accruing in any of the eight
Tahun” dan dapat dikurangkan seluruhnya atau years succeeding the year in which the loss was
sebagian dari laba bersih yang diperoleh dalam incurred.
salah satu dari delapan tahun berikutnya pada tahun
terjadinya kerugian tersebut.
ESC Darajat Darajat ESC
Sehubungan dengan JOC antara Kelompok In conjunction with the Darajat Contractor Group
Kontraktor Darajat dengan PERTAMINA, entering into the JOC with PERTAMINA,
PERTAMINA membuat ESC dengan PLN, dimana PERTAMINA entered into an ESC with PLN
PLN setuju untuk membeli energi panas bumi dan whereby PLN agreed to purchase geothermal
listrik, yang dikirim oleh Kelompok Kontraktor energy and electricity delivered by the Darajat
Darajat. Tagihan dinyatakan dan dibayar dalam Contractor Group. The invoice is stated and payable
mata uang AS$. in US$.
17
Page 20
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Sesuai dengan ketentuan take-or-pay yang diatur In accordance with the terms of the take-or-pay
dalam Darajat Amended and Restated ESC tanggal provisions of the Darajat Amended and Restated
1 Mei 2000, PLN harus membayar minimal 80% dari ESC dated 1 May 2000, PLN should pay a minimum
tingkat kapasitas masing-masing Unit yang 80% of the rated capacity of each Unit in operation
beroperasi untuk setiap Unit yang dimiliki oleh PLN for the Unit owned by PLN (Unit I) and 95% of the
(Unit I) dan 95% dari rata-rata kilowatt kapasitas average gross kilowatt generating capacity of the
bruto unit yang dibangun, dimiliki dan dioperasikan relevant units built, owned and operated by the
oleh Kelompok Kontraktor Darajat (Unit II dan III). Darajat Contractor Group (Units II and III).
Pada tanggal 10 Agustus 2004, ketentuan dari On 10 August 2004, the terms of the Darajat
Darajat Amended and Restated ESC mengalami Amended and Restated ESC were amended
perubahan kembali melalui Amendemen Perjanjian through Amendment Agreement No. 2 signed by
No. 2 yang ditandatangani oleh PLN, PERTAMINA PLN, PERTAMINA and the Darajat Contractor
dan Kelompok Kontraktor Darajat. Perubahan- Group. The significant amendments are as follows:
perubahan yang signifikan adalah sebagai berikut:
Berkaitan dengan Unit III Darajat, harga dasar With respect to Darajat Unit III, the base
sumber daya energi panas bumi dan listrik resource price of geothermal energy and
adalah AS$0,042336 - angka penuh per kWh. electricity is US$0.042336 – full amount per
kWh.
Segala hak dan pendapatan dari semua All rights to and revenue from any and all
perdagangan dan emisi kredit sebagai hasil dari emissions credits and trading as a result of the
United Nations Framework Convention on United Nations Framework Convention on
Climate Change (“UNFCCC”) dan Protokol Climate Change (“UNFCCC”) and Kyoto
Kyoto untuk Clean Development Mechanism Protocol for Clean Development Mechanism
(“CDM”) atau mekanisme Pasar Emisi Kredit (“CDM”) or other Gas Emission Credit Market
Gas lainnya yang meliputi Area Kontrak Darajat mechanisms related to the Darajat Contract
merupakan properti dari dan dimiliki oleh Area are the property of and owned by the
Kelompok Kontraktor Darajat. Darajat Contractor Group.
Pada tanggal 28 April 2014, bagian 5.2 dari ESC On 28 April 2014, the amended ESC section 5.2 was
yang telah diubah, telah disetujui untuk mengatur approved to change the Indonesian Consumer Price
perubahan Indeks Harga Konsumen (“IHK”) dari Index (“CPI”) from base year 2007 = 100 to base
tahun dasar 2007 = 100 menjadi tahun dasar 2012 = year 2012 = 100, which was implemented
100, di mana hal ini langsung diimplementasikan immediately for energy transactions from the second
dalam transaksi energi untuk kuartal kedua di tahun quarter of 2014.
2014.
Darajat Joint Operating Agreement (“JOA”) Darajat Joint Operating Agreement (“JOA”)
SEGD-I dan SEGD-II mengadakan JOA tertanggal SEGD-I and SEGD-II entered into a JOA dated
23 Agustus 1997 (sebagaimana telah diubah dari 23 August 1997 (as amended from time to time and
waktu ke waktu dan yang paling akhir tanggal most recently amended on 1 January 2009) with
1 Januari 2009) dengan PT DGI, dimana PT DGI PT DGI, whereby PT DGI was assigned a 5%
diberikan hak partisipasi sebesar 5%, termasuk hak participating interest in, and the rights and
dan kewajiban sebagaimana diatur dalam, JOC dan obligations under, the JOC and ESC for the Unit II
ESC untuk fasilitas pembangkit listrik Unit II dan power generating facility and all future units.
semua unit masa depan. SEGD-I, SEGD-II dan SEGD-I, SEGD-II and PT DGI together form the
PT DGI secara bersama-sama membentuk Darajat Contractor Group.
Kelompok Kontraktor Darajat.
Amendemen No. 1 atas Darajat Amended and Amendment No. 1 to the Darajat Amended and
Restated JOA ditandatangani pada tanggal Restated JOA was signed on 1 January 2009. The
1 Januari 2009. Amendemen tersebut menyatakan amendment provides that all parties agree to appoint
bahwa seluruh pihak menyetujui untuk menunjuk SEGD-II as the operator for the CDM project and act
SEGD-II sebagai operator untuk proyek CDM dan for and on behalf of the Darajat Contractor Group, to
bertindak untuk dan atas nama Kelompok Kontraktor sell the Certified Emission Reductions and receive
Darajat, dalam rangka menjual Certified Emission the payments.
Reductions dan untuk menerima pembayaran.
18
Page 21
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Kegiatan operasi komersial Sumber Energi Panas The Unit I Geothermal Energy Plant (“Unit I”)
Bumi Unit I (“Unit I”) dimulai pada tahun 1994 dengan commenced commercial operations in 1994 and has
kapasitas pembangkit sebesar 55 MW. Pembangkit a power generation capacity of 55 MW. The Unit II
listrik Unit II (“Unit II”) mulai beroperasi komersial Power Plant (“Unit II”) was commissioned and
pada tanggal 1 Juni 2000 dengan kapasitas commenced commercial operations on 1 June 2000
pembangkit sebesar 70 MW, yang selanjutnya with a power generation capacity at commissioning
meningkat menjadi 97,5 MW. Pembangkit listrik Unit of 70 MW, subsequently increased to 97.5 MW. The
III (“Unit III”) mulai dioperasikan tanggal 12 Mei 2007 Unit III Power Plant (“Unit III”) was commissioned
dengan kapasitas pembangkit 110 MW, yang and commenced commercial operations on
kemudian kapasitasnya ditingkatkan menjadi 122 12 May 2007 with a power generation capacity of
MW. 110 MW, subsequently increased to 122 MW.
Hak partisipasi dari pihak-pihak yang terlibat dalam The respective participating interests of the
Kelompok Kontraktor Darajat adalah sebagai participants in the Darajat Contractor Group are as
berikut: follows:
Unit I Unit II dan/and III
(Uap)/(Steam) (Listrik)/(Electricity)
SEGD-I 50,0% 47,5%
SEGD-II 50,0% 47,5%
PT DGI 0,0% 5,0%
100,0% 100,0%
SEGSL dan Star Energy Geothermal Salak Pratama SEGSL and Star Energy Geothermal Salak Pratama
Ltd. (“SEGSPL”) – semuanya sebagai “Kelompok Ltd. (“SEGSPL”) - together the “Salak Contractor
Kontraktor Salak” Group”
SEGSL adalah perusahaan Bermuda yang didirikan SEGSL is a Bermuda Corporation, incorporated
dengan nama Union Geothermal of Indonesia, under the original name Union Geothermal of
Limited berdasarkan sertifikat pendirian tertanggal Indonesia, Limited based on a certificate of
25 November 1981, di bawah hukum Bermuda incorporation dated 25 November 1981, under the
dengan kegiatan usaha utama di Indonesia. Pada Laws of Bermuda with its principal place of business
tanggal 31 Maret 2017, namanya berubah menjadi in Indonesia. It changed its name to SEGSL on
SEGSL setelah diakuisisi oleh SEG-SD B.V. sebagai 31 March 2017 after its acquisition by SEG-SD B.V.
bagian dari perjanjian jual beli tertanggal as part of a sale and purchase agreement on
22 Desember 2016 antara CVX dan Star Energy 22 December 2016 between CVX and the Star
Consortium dengan tujuan untuk menjual aset panas Energy Consortium to sell CVX’s Indonesian
bumi CVX Indonesia. geothermal assets.
SEGSPL (dahulu Dayabumi Salak Pratama, Ltd. SEGSPL (formerly known as Dayabumi Salak
(“DSPL”)) adalah perusahaan yang dibentuk pada Pratama, Ltd. (“DSPL”)) is a special purpose
tanggal 1 Mei 1996 di Cayman Islands, dengan company formed on 1 May 1996 under the laws of
kegiatan usaha utama di Indonesia, dengan tujuan the Cayman Islands, with its principal place of
untuk membangun dan mengoperasikan fasilitas business in Indonesia, for the purpose of building
sumber energi panas bumi (“Power Plant”). SEGSPL and operating a geothermal energy fuelled power
merupakan entitas anak yang dimiliki sepenuhnya generating facility (the “Power Plant”). SEGSPL is a
oleh SEGSL. Namanya diubah menjadi SEGSPL wholly-owned subsidiary of SEGSL. It changed its
pada tanggal 31 Maret 2017 setelah diakuisisi oleh name to SEGSPL on 31 March 2017 after its
SEG-SD B.V. sebagai bagian dari perjanjian jual beli acquisition by SEG-SD B.V. as part of a sales and
tanggal 22 Desember 2016 antara CVX dan Star purchase agreement dated 22 December 2016
Energy Consortium untuk menjual aset panas bumi between CVX and the Star Energy Consortium to
milik CVX. sell CVX’s Indonesian geothermal assets.
19
Page 22
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Salak JOC Salak JOC
Pada tanggal 11 Februari 1982, Union Geothermal On 11 February 1982, Union Geothermal of
of Indonesia, Ltd., yang sekarang berubah menjadi Indonesia, Ltd., now succeeded by SEGSL, entered
SEGSL, mengadakan JOC dengan PERTAMINA, into a JOC with PERTAMINA, for which geothermal
dimana kegiatan operasional panas bumi sekarang operations are now managed by PGE, to explore
dikelola oleh PGE, untuk mengeksplorasi dan and develop geothermal energy resources within the
mengembangkan sumber energi panas bumi di area Gunung Salak contract area. The JOC governs the
kontrak Gunung Salak. JOC mengatur pelaksanaan conduct of geothermal operations in the contract
operasi panas bumi di wilayah kontrak. Berdasarkan area. Under the terms of the JOC, SEGSL is
ketentuan JOC, SEGSL diharuskan untuk mengirim required to deliver the geothermal energy produced
sumber energi panas bumi yang diproduksi dalam in the contract area to PLN through PGE, pursuant
area tersebut kepada PLN melalui PGE, sesuai to the ESC discussed below. This geothermal
dengan ESC yang dibahas di bawah ini. Energi energy is used by PLN to generate electricity from
sumber panas bumi ini digunakan oleh PLN untuk three 55 MW, subsequently increased to 60 MW
pembangkit listrik dari tiga unit operasional power generating units (Units 1, 2 and 3) owned and
berkapasitas 55 MW, yang selanjutnya meningkat operated by PLN in the contract area. The JOC was
menjadi 60 MW unit pembangkit (Unit 1, 2 dan 3) amended on 16 November 1994 and again on
yang dimiliki dan dioperasikan oleh PLN di area 22 July 2002.
kontrak tersebut. JOC tersebut kemudian diubah
pada tanggal 16 November 1994 dan selanjutnya
pada tanggal 22 Juli 2002.
Pada tanggal 1 Mei 1996, CGS mendirikan DSPL On 1 May 1996, CGS established DSPL as a wholly
sebagai entitas anak yang dimiliki sepenuhnya dan owned subsidiary and assigned all of its rights,
diberikan seluruh hak, kewajiban, dan interests and obligations under the JOC in respect of
kepemilikannya berdasarkan JOC terkait dengan construction and operation of an additional three 55
kegiatan konstruksi dan operasional dari MW, subsequently increased to 67 MW power
penambahan 3 unit pembangkit listrik 55 MW, yang generating units (Units 4, 5 and 6). This was
selanjutnya meningkat menjadi 67 MW unit confirmed in Amendment No. 2 to the Gunung Salak
pembangkit (Unit 4, 5 dan 6). Hal ini dikonfirmasi amended and restated JOC dated 22 July 2002.
melalui Amendemen No. 2 atas Gunung Salak Amendment No. 2 also extended the JOC term to
amended and restated JOC pada tanggal 1 December 2030, which was further extended to
22 Juli 2002. Amendemen No. 2 tersebut juga 30 November 2040.
memperpanjang jangka waktu JOC yang
sebelumnya hingga 1 Desember 2030, dimana
seterusnya diperpanjang hingga 30 November 2040.
JOC Salak tunduk pada Keputusan Presiden No. 49 The Salak JOC is subject to Presidential Decree No.
tahun 1991 dan Keputusan Menteri Keuangan No. 49 of 1991, and the Minister of Finance Decree No.
766/1992 yang memberikan tarif pajak inklusif pada 766/1992 which provides the Salak Contractor
Kelompok Kontraktor Salak sebesar 34% dari laba Group with an all-inclusive tax rate of 34% of net
bersih operasional, sebagaimana didefinisikan operating income as defined in the JOC and the
dalam Undang-Undang Pajak Penghasilan 1984 Indonesian Income Tax Law. In certain
Indonesia Tahun 1984. Dalam peraturan Pemerintah Government regulations, this 34% is referred to as
tertentu, 34% tersebut disebut sebagai “bagian the “Government share”. The Salak Contractor
Pemerintah”. Selain itu, Kelompok Kontraktor Salak Group is also required to pay the PGE production
diharuskan membayar penyisihan produksi setara allowance equivalent to 4% of net operating income
dengan 4% dari laba bersih operasional, dihitung calculated based on the 1984 Indonesian Income
berdasarkan Undang-Undang Pajak penghasilan Tax Law. The PGE production allowance represents
Indonesia Tahun 1984. Tunjangan Produksi PGE a royalty fee paid to PGE. This charge is tax
merupakan biaya royalti yang dibayarkan kepada deductible; therefore, it is accounted for as an
PGE. Beban ini dapat dikurangkan dari pajak; oleh expense in profit or loss.
karenanya dicatat sebagai beban laba rugi.
20
Page 23
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Salak ESC Salak ESC
Bersamaan dengan SEGSL mengadakan JOC pada In conjunction with SEGSL entering into the JOC
tanggal 11 Februari 1982 dengan PERTAMINA, dated 11 February 1982 with PERTAMINA,
PERTAMINA mengadakan ESC dengan PLN di PERTAMINA entered into an ESC with PLN
mana PLN telah menyetujui untuk membeli sumber whereby PLN agreed to purchase geothermal
energi panas bumi yang akan dikirim oleh SEGSL. energy delivered by SEGSL. In connection with the
Mengacu pada Amended and Restated JOC tanggal amendment and restatement of the JOC dated
16 November 1994, ESC juga diubah dan disajikan 16 November 1994, the ESC was also amended and
kembali (“Salak Amended and Restated ESC”). restated (“Salak Amended and Restated ESC”).
Jangka waktu Amended and Restated Salak ESC The term of the Salak Amended and Restated ESC
berakhir dalam waktu 420 bulan setelah tanggal is for a period ending 420 months after
16 November 1994 (“Tanggal Efektif”) dengan 16 November 1994 (the “Effective Date”) provided
ketentuan apabila periode produksi akan that should any production period extend beyond the
diperpanjang melebihi jangka waktu Salak Amended term of the Salak Amended and Restated ESC, the
and Restated ESC, maka jangka waktu tersebut term will be automatically extended until the end of
akan secara otomatis diperpanjang hingga such production period. The production period for
berakhirnya periode produksi tersebut. Periode delivery of geothermal energy to the initial unit, or
produksi untuk pengiriman energi panas bumi untuk electricity from each unit built, owned and operated
unit pertama, atau listrik dari setiap unit yang by SEGSL, shall be at least 360 months
dibangun, dimiliki dan dioperasikan oleh SEGSL, commencing on the date of commercial generation
adalah 360 bulan sejak tanggal komersial dari setiap of each unit, with the provision that if a production
unit, dengan ketentuan jika periode produksi berakhir period ends prior to the end of the term of the Salak
sebelum akhir dari Salak Amended and Restated Amended and Restated ESC, such production
ESC, maka periode produksi tersebut akan secara period shall be automatically extended to coincide
otomatis diperpanjang sampai akhir jangka waktu. with the end of such term.
Jangka waktu yang dinyatakan dalam Salak The terms as stated in the Salak Amended and
Amended and Restated ESC kemudian diubah Restated ESC were later amended through an
melalui perjanjian amendemen (“Second Amendment Agreement (“Second Amendment”)
Amendment”) yang telah ditandatangani oleh signed by SEGSL on 22 July 2002. Significant
SEGSL pada tanggal 22 Juli 2002. Perubahan yang amendments are as follows:
signifikan adalah sebagai berikut:
SEGSPL menjadi pihak dalam ESC, di mana SEGSPL became a party in the ESC, whereby
SEGSPL mempunyai hak untuk SEGSPL shall have the right to generate and
mengoperasikan dan mengirim listrik kepada deliver electricity to PLN on behalf of
PLN atas nama PERTAMINA menggunakan PERTAMINA using any combination of Units 4,
kombinasi dari Unit 4, 5 dan 6. 5 and 6.
Jangka waktu ESC akan berakhir tanggal The term of the ESC will end on 1 December
1 Desember 2030 dan telah diperpanjang 2030 and has been extended to 30 November
sampai 30 November 2040. 2040.
Berkaitan dengan seluruh unit, harga dasar With respect to all units, the base resource price
sumber daya energi panas bumi akan diturunkan of geothermal energy was decreased from
dari AS$0,04302 – nilai penuh, per kWh US$0.04302 – full amount, per kWh under the
berdasarkan ESC asli ke AS$0,03724 – nilai original ESC to US$0.03724 – full amount per
penuh per kWh. kWh.
Sesuai dengan amendemen kedua tersebut, PLN The terms of the Second Amendment provide that
harus membayar PGE, yang kemudian akan PLN shall pay PGE, who will then remit to SEGSL
dibayarkan ke SEGSL dan SEGSPL, untuk setiap and SEGSPL, for the geothermal energy and
energi panas bumi dan listrik yang dikirim setiap electricity delivered each month based upon pricing
bulannya berdasarkan rumus harga yang dinyatakan formulas stated in the ESC. The invoice is stated and
dalam ESC. Tagihan tersebut dinyatakan dan payable in United States Dollars.
dibayar dalam mata uang Dolar Amerika Serikat.
Sesuai dengan ketentuan take-or-pay dalam In accordance with the terms of the take-or-pay
Amendemen Kedua, PLN harus membayar provisions of the Second Amendment, PLN should
minimum 95,06% dari total kapasitas rated Unit 1, 2 pay a minimum 95.06% of the total rated capacity of
dan 3. Untuk Unit 4, 5 dan 6, PLN harus membayar Units 1, 2 and 3. For Units 4, 5 and 6, PLN should
minimum 90,14% dari total tarif kapasitas. pay a minimum 90.14% of the total rated capacity.
21
Page 24
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
PT Star Energy Geothermal Drilling Services PT Star Energy Geothermal Drilling Services
(“SEGDS”) (“SEGDS”)
Berdasarkan Akta Notaris No. 65 tanggal 12 Juli Based on Notarial Deed No. 65 dated 12 July 2023,
2023, oleh Jose Dima Satria, S.H., M.Kn., notaris by Jose Dima Satria, S.H., M.Kn., a notary in Jakarta,
di Jakarta, SEGPL dan SEG-SD B.V mendirikan SEGPL and SEG-SD B.V established a company
sebuah perusahaan bernama SEGDS dengan named SEGDS with total authorised capital
modal dasar sejumlah Rp150.400.000.000 – nilai amounted to IDR150,400,000,000 – full amount (or
penuh (atau setara dengan AS$10.000.000 – nilai equivalent to US$10,000,000 – full amount)
penuh) terdiri dari 100.000 lembar saham, dengan consisting of 100,000 shares with par value of
nominal Rp1.504.000 – nilai penuh (atau setara IDR1,504,000 (or equivalent to US$100 – full
dengan AS$100 – nilai penuh). Dari modal dasar, amount). From the authorised capital, the issued and
yang telah ditempatkan dan disetor penuh adalah paid-in capital is 56% or equivalent to 56,000 shares
sebesar 56% atau sejumlah 56.000 lembar saham amounted to IDR84,224,000,000 – full amount (or
dengan nilai nominal sebesar Rp84.224.000.000 – equivalent to US$5,600,000 – full amount), with
nilai penuh (atau setara dengan AS$5.600.000 – SEGPL as majority shareholder with 28.560 shares
nilai penuh), dengan SEGPL sebagai pemegang and SEG-SD B.V. holding 27,440 shares. The deed
saham mayoritas dengan 28.560 lembar saham was approved by the Minister of Law and Human
dan SEG-SD B.V. memiliki 27.440 lembar saham. Rights of the Republic of Indonesia through Decree
Akta tersebut telah disahkan oleh Menteri Hukum No. AHU-0053485.AH.01.01.Tahun 2023 dated
dan Hak Asasi Manusia Republik Indonesia melalui 24 July 2023.
Surat Keputusannya No. AHU- 0053485.AH.01.01.
Tahun 2023 tanggal 24 Juli 2023.
SEGDS adalah perseroan terbatas yang didirikan SEGDS is a limited liability company incorporated and
dan berdomisili di Indonesia. Aktivitas utama domiciled in Indonesia. The principal activity of
SEGDS adalah menyediakan jasa pengeboran SEGDS is providing drilling services for geothermal
sumber energi panas bumi. energy resources.
PT Star Energy Geothermal Suoh Sekincau PT Star Energy Geothermal Suoh Sekincau
(“PT SEGSS”) (“PT SEGSS”)
Pada tanggal 6 April 2017, SEG-SD B.V. On 6 April 2017, SEG-SD B.V. acquired PT Chevron
mengakuisisi PT Chevron Geothermal Suoh Geothermal Suoh Sekincau. Effective on that date,
Sekincau. Efektif sejak tanggal tersebut, PT Chevron PT Chevron Geothermal Suoh Sekincau changed its
Geothermal Suoh Sekincau diubah menjadi name to PT SEGSS by Deed No. 3 of Notary Liestiani
PT SEGSS melalui Akta No. 3 dari Notaris Liestiani Wang, S.H., M.Kn., dated 6 April 2017. The
Wang, S.H., M.Kn., tertanggal 6 April 2017. Entitas immediate parent of PT SEGSS is SEG-SD B.V., with
induk dari PT SEGSS adalah SEG-SD B.V. dengan 95% ownership.
kepemilikan sebesar 95%.
Pada tanggal 21 Juni 2018, Kementerian ESDM On 21 June 2018, the MoEMR approved the
serta menyetujui Penugasan Survei Pendahuluan Assignment of Preliminary Survey and Exploration
dan Eksplorasi (Pelaksanaan Penugasan Survei (Pelaksanaan Penugasan Survei Pendahuluan dan
Pendahuluan dan Eksplorasi (“PSPE”)) Suoh Eksplorasi (“PSPE”)) of South Suoh Sekincau. In
Sekincau Selatan. Sehubungan dengan PSPE ini, relation to this PSPE, PT SEGSS is required to
PT SEGSS diwajibkan untuk melakukan paling perform at least one drilling for an exploration well
sedikit satu kali pengeboran sumur eksplorasi dalam within the period (i.e. three years) in South Suoh
jangka waktu (yaitu tiga tahun) di Suoh Sekincau Sekincau. On 29 July 2021, the MoEMR approved
Selatan. Pada tanggal 29 Juli 2021, Kementerian extending the PSPE of South Suoh Sekincau until
ESDM menyetujui untuk memperpanjang PSPE 20 June 2023. On 5 October 2022, the MoEMR
Suoh Sekincau Selatan hingga 20 Juni 2023. Pada approved extending the PSPE of South Suoh
tanggal 5 Oktober 2022, Kementerian ESDM Sekincau, so the period of the PSPE will be prolonged
menyetujui untuk memperpanjang PSPE Suoh until 20 June 2024. On 26 March 2024, the MoEMR
Sekincau Selatan hingga 20 Juni 2024. Pada tanggal approved extending the PSPE of South Suoh
26 Maret 2024, Kementerian ESDM menyetujui Sekincau, so the period of the PSPE will be prolonged
untuk memperpanjang PSPE Suoh Sekincau until 20 June 2025. On 3 June 2025, the MoEMR
Selatan hingga 20 Juni 2025. Pada tanggal 3 Juni approved extending the PSPE of South Suoh
2025, Kementerian ESDM menyetujui untuk Sekincau, so the period of the PSPE will be prolonged
memperpanjang PSPE Suoh Sekincau Selatan until 20 June 2026.
hingga 20 Juni 2026.
22
Page 25
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Jika pengeboran eksplorasi dan penilaian berhasil If exploration and appraisal drilling is successful in
memastikan potensi panas bumi, dan PT SEGSS confirming geothermal potential, and PT SEGSS
memperoleh pembiayaan yang diperlukan dan obtains the necessary financing and government
persetujuan pemerintah untuk pengembangan serta approvals for development as well as an attractive
tingkat tarif yang menarik di bawah ESC dengan tariff rate under the ESC with PLN, PT SEGSS would
PLN, PT SEGSS diharapkan dapat memulai expect to commence development activities. As of the
kegiatan pembangunan. Sampai dengan tanggal issuance date of these consolidated financial
diterbitkan laporan keuangan konsolidasian ini, statements, management is still in the process of
manajemen masih dalam proses mendapatkan izin obtaining the permits (environmental impact
(analisis dampak lingkungan (“AMDAL”), dan lain- assessment (“AMDAL”), etc).
lain).
2. PENERAPAN STANDAR AKUNTANSI KEUANGAN 2. ADOPTION OF NEW AND REVISED STATEMENTS
BARU DAN REVISI (“PSAK”) DAN INTERPRETASI OF FINANCIAL ACCOUNTING STANDARDS
STÁNDAR AKUNTANSI KEUANGAN (“ISAK”) (“PSAK”) AND INTERPRETATIONS OF PSAK
(“ISAK”)
a. Amandemen/ Penyesuaian Standar yang a. Amendments/ Improvements to Standards
Berlaku Efektif pada Tahun Berjalan Effective in the Current Year
Penerapan dari standar dan amandemen terhadap The adoption of the following standard and
standar akuntansi, yang berlaku efektif sejak tanggal amendments to accounting standards which are
1 Januari 2025 berikut tidak menyebabkan effective from 1 January 2025 did not result in
perubahan signifikan atas kebijakan akuntansi Grup substantial changes to the Group’s accounting
dan tidak memberikan dampak yang material policies and had no material effect on the amounts
terhadap jumlah yang dilaporkan di laporan reported in the interim consolidated financial
keuangan konsolidasian interim pada periode statements for the current period:
berjalan:
- PSAK No. 117 “Kontrak Asuransi” - PSAK No. 117, “Insurance Contracts”
- Amandemen PSAK No. 221, “Pengaruh - Amendment to PSAK No. 221, “The Effect of
Perubahan Kurs Valuta Asing – Kekurangan Changes in Foreign Exchange Rates – Lack of
Ketertukaran” Exchangeability”
b. Standar dan Amandemen/ Penyesuaian Standar b. Standard and Amendments/ Improvements to
Telah Diterbitkan tapi Belum Diterapkan Standards Issued but not yet Adopted
Pada tanggal persetujuan laporan keuangan At the date of authorization of these consolidated
konsolidasian, standar, interpretasi dan amandemen- financial statements, the following standard,
amandemen atas PSAK yang relevan bagi Grup, inerpretation and amendments to PSAK relevant to
yang telah diterbitkan namun belum berlaku efektif, the Group were issued but not effective, with early
dengan penerapan dini diizinkan, adalah sebagai application permitted:
berikut:
- Amendemen PSAK No. 107 "Instrumen - Amendment to PSAK No. 107, “Financial
Keuangan: Pengungkapan ” Instruments: Disclosures”
- Amandemen PSAK No. 109, “Instrumen - Amendment to PSAK No. 109, “Financial
Keuangan” Instruments”
Standar baru dan amandemen yang telah The new standard and amendments issued effective
diterbitkan, berlaku efektif untuk tahun buku yang for the financial year beginning 1 January 2026, with
dimulai pada 1 Januari 2026, tetapi penerapan dini early adoption is permitted.
diperkenankan.
Pada tanggal penyelesaian laporan keuangan As at the completion date of these interim
konsolidasian interim ini, Grup sedang mempelajari consolidated financial statements, the Group is
dampak yang mungkin timbul dari penerapan standar evaluating the potential impact of the new standard
baru dan amandemen pada laporan keuangan and amendments on the Group’s interim
konsolidasian interim Grup. consolidated financial statements.
23
Page 26
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
3. INFORMASI KEBIJAKAN AKUNTANSI MATERIAL 3. MATERIAL ACCOUNTING POLICY INFORMATION
Laporan keuangan konsolidasian Grup telah disusun The Group’s consolidated financial statements were
dan diselesaikan oleh Direksi dan diotorisasi untuk prepared and finalised by the Board of Directors and
diterbitkan pada tanggal 31 Juli 2025. authorised for issuance on 31 July 2025.
a. Dasar penyusunan laporan keuangan a. Basis of preparation of the consolidated financial
konsolidasian statements
Laporan keuangan konsolidasian ini telah disusun The consolidated financial statements have been
dan disajikan sesuai dengan Standar Akuntansi prepared and presented in accordance with
Keuangan di Indonesia, yang mencakup Indonesian Financial Accounting Standards,
Pernyataan Standar Akuntansi Keuangan including Statements of Financial Accounting
(“PSAK”) dan Interpretasi Standar Akuntansi Standards (“PSAK”) and Interpretations of Financial
Keuangan (“ISAK”) dan Peraturan Otoritas Jasa Accounting Standards (“ISAK”) and Financial
Keuangan (“OJK”) No. VIII.G.7 tentang Penyajian Services Authority (“OJK”) Regulation No. VIII.G.7
dan Pengungkapan Laporan Keuangan Emiten on Financial Statement Presentation and Disclosure
atau Perusahaan Publik. of Issuers or Public Companies.
Laporan keuangan konsolidasian Grup telah The consolidated financial statements of the Group
disusun dengan dasar akrual, kecuali untuk have been prepared on the accrual basis, except for
laporan arus kas konsolidasian, dan menggunakan the consolidated statements of cash flows, and using
konsep akuntansi biaya historis, kecuali the historical cost concept of accounting, except as
diungkapkan dalam kebijakan akuntansi di bawah disclosed in the accounting policies below.
ini.
Laporan arus kas konsolidasian disusun The consolidated statements of cash flows have
menggunakan metode langsung dengan been prepared based on the direct method by
mengklasifikasikan arus kas berdasarkan aktivitas classifying cash flows on the basis of operating,
operasi, investasi dan pendanaan. investing and financing activities.
Seluruh angka dalam laporan keuangan Figures in the consolidated financial statements are
konsolidasian ini dibulatkan dalam ribuan dan rounded to thousands and stated in United States
disajikan dalam Dolar Amerika Serikat (“AS$” atau Dollars (“US$” or “US Dollars”), unless otherwise
“Dolar AS”), kecuali dinyatakan lain. stated.
Untuk memberi pemahaman yang lebih baik atas In order to provide further understanding of the
kinerja keuangan Grup, karena sifat dan jumlahnya financial performance of the Group, due to the
yang signifikan, beberapa item pendapatan dan significant nature or amount, several items of income
beban telah disajikan secara terpisah. or expense have been shown separately.
Penyusunan laporan keuangan konsolidasian The preparation of consolidated financial statements
berdasarkan Standar Akuntansi Keuangan di in conformity with Indonesian Financial Accounting
Indonesia memerlukan penggunaan estimasi dan Standards requires the use of certain critical
asumsi akuntansi penting tertentu. Penyusunan accounting estimates and assumptions. It also
laporan keuangan konsolidasian juga requires management to exercise its judgement in
mengharuskan manajemen untuk membuat the process of applying the Group’s accounting
pertimbangan dalam proses penerapan kebijakan policies. The areas involving a higher degree of
akuntansi Grup. Area-area yang memerlukan judgement or complexity, or areas where
tingkat pertimbangan yang lebih tinggi atau assumptions and estimates are significant to the
kompleks, atau area dimana asumsi dan estimasi consolidated financial statements are disclosed in
yang berdampak signifikan terhadap laporan Note 4.
keuangan konsolidasian diungkapkan dalam
Catatan 4.
24
Page 27
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
b. Prinsip-prinsip konsolidasi b. Principles of consolidation
i. Entitas anak i. Subsidiaries
i.1. Konsolidasi i.1. Consolidation
Entitas anak adalah seluruh entitas Subsidiaries are all entities (including
(termasuk entitas terstruktur) dimana structured entities), over which the Group
Grup memiliki pengendalian. Grup has control. The Group controls an entity
mengendalikan entitas lain ketika Grup when the Group is exposed to, or has rights
terekspos atas, atau memiliki hak untuk to, variable returns from its involvement
pengembalian yang bervariasi dari with the entity and has the ability to affect
keterlibatannya dengan entitas dan those returns through its power over the
memiliki kemampuan untuk entity.
mempengaruhi pengembalian tersebut
melalui kekuasaannya atas entitas itu.
Entitas anak dikonsolidasikan secara Subsidiaries are fully consolidated from the
penuh sejak tanggal dimana date on which control is transferred to the
pengendalian dialihkan kepada Grup. Group. They are deconsolidated from the
Entitas anak tidak dikonsolidasikan sejak date that control ceases.
tanggal Grup kehilangan pengendalian.
Saldo, transaksi, penghasilan, dan beban Intragroup balances, transactions, income
intra kelompok usaha dieliminasi. and expenses are eliminated. Profits and
Keuntungan dan kerugian hasil dari losses resulting from intragroup
transaksi intra kelompok usaha yang transactions that are recognised in assets
diakui dalam aset juga dieliminasi. are also eliminated. The accounting
Kebijakan akuntansi entitas anak telah policies of subsidiaries have been changed
diubah seperlunya untuk memastikan where necessary to ensure consistency
konsistensi penerapan kebijakan oleh with the policies adopted by the Group.
Grup.
i.2. Akuisisi i.2. Acquisition
Grup menerapkan metode akuisisi untuk The Group applies the acquisition method
mencatat setiap kombinasi bisnis. to account for business combinations. The
Imbalan yang dialihkan untuk consideration transferred for the acquisition
mengakuisisi entitas anak adalah nilai of a subsidiary is the fair value of the assets
wajar seluruh aset yang dialihkan, transferred, the liabilities incurred to the
liabilitas yang diakui oleh pihak former owners of the acquired entity and
pengakuisisi kepada pemilik sebelumnya the equity interests issued by the Group.
dari entitas yang diakuisisi dan The consideration transferred includes the
kepentingan ekuitas yang diterbitkan oleh fair value of any asset or liability resulting
Grup. Imbalan yang dialihkan termasuk from a contingent consideration
nilai wajar setiap aset dan liabilitas yang arrangement. Identifiable assets acquired,
dihasilkan dari suatu kesepakatan liabilities and contingent liabilities assumed
imbalan kontinjensi. Aset teridentifikasi, in a business combination are measured
liabilitas dan liabilitas kontinjensi yang initially at their fair values as at the
diambil alih, yang diperoleh dalam acquisition date.
kombinasi bisnis diukur pada awalnya
sebesar nilai wajar pada tanggal akuisisi.
Grup mengakui kepentingan non- The Group recognises any non-controlling
pengendali pada pihak yang diakuisisi interest in the acquiree on an acquisition-
baik sebesar nilai wajar atau sebesar by-acquisition basis, either at fair
bagian proporsional kepentingan non- value or at the non-controlling interest’s
pengendali atas aset neto teridentifikasi proportionate share of the acquiree’s
pihak yang diakuisisi. Kepentingan non- identifiable net assets. Non-controlling
pengendali disajikan di ekuitas dalam interests are reported in equity in the
laporan posisi keuangan konsolidasian, consolidated statements of financial
terpisah dari ekuitas pemilik entitas induk. position, separate from the owners of the
parent entity.
Biaya terkait akuisisi dibebankan pada Acquisition-related costs are expensed as
saat terjadinya. incurred.
25
Page 28
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Jika kombinasi bisnis diperoleh secara If the business combination is achieved in
bertahap, Grup akan mengukur stages, the Group will remeasure its
kepentingan ekuitas yang sebelumnya previously held equity interest in the
dimiliki pada pihak yang diakuisisi acquiree at its fair value at its acquisition
sebesar nilai wajar pada tanggal akuisisi date and recognise the resulting gain or
dan mengakui keuntungan atau kerugian loss, if any, in profit or loss. Any contingent
yang dihasilkan, jika ada, dalam laba rugi. consideration to be transferred by the
Imbalan kontinjensi yang masih harus Group is recognised at its fair value as at
dialihkan oleh Grup diakui sebesar nilai the acquisition date. Subsequent changes
wajar pada tanggal akuisisi. Perubahan to the fair value of the contingent
selanjutnya atas nilai wajar imbalan consideration that is deemed to be an asset
kontinjensi yang diakui sebagai aset atau or a liability are recognised in profit or loss.
liabilitas dan dicatat dalam laba rugi. A contingent consideration that is classified
Imbalan kontinjensi yang diklasifikasikan as equity is not remeasured, and its
sebagai ekuitas tidak diukur kembali dan subsequent settlement is accounted for
penyelesaian selanjutnya diperhitungkan within equity.
dalam ekuitas.
Selisih lebih antara imbalan yang The excess of the consideration
dialihkan, jumlah setiap kepentingan non- transferred, the amount of any non-
pengendali dalam pihak yang diakuisisi, controlling interests in the acquiree and the
dan nilai wajar pada tanggal akuisisi dari acquisition-date fair value of any previous
kepemilikan ekuitas yang sebelumnya equity interest in the acquiree over the fair
dimiliki oleh pihak pengakuisisi pada value of the Group’s share of the
pihak yang diakuisisi, dibandingkan identifiable net assets acquired is recorded
dengan nilai wajar bagian Grup atas aset as goodwill. If those amounts are less than
bersih teridentifikasi yang diakuisisi, the fair value of the net identifiable assets
dicatat sebagai goodwill. Jika jumlah of the subsidiary acquired and the
tersebut lebih kecil dari nilai wajar atas measurement of all amounts has been
aset bersih teridentifikasi entitas anak reviewed, in the case of a bargain
yang diakuisisi dan pengukuran atas purchase, the difference is recognised
seluruh jumlah tersebut telah ditelaah, directly in profit or loss.
dalam hal pembelian dengan diskon,
selisih tersebut diakui secara langsung
dalam laba rugi.
ii. Perubahan kepemilikan atas entitas anak ii. Changes in ownership interest in
tanpa kehilangan pengendalian subsidiaries without loss of control
Transaksi dengan pihak non-pengendali yang Transactions with non-controlling interests
tidak mengakibatkan hilangnya pengendalian that do not result in a loss of control are
dicatat sebagai transaksi ekuitas. Selisih accounted for as equity transactions. The
antara nilai wajar imbalan yang dibayarkan difference between the fair value of any
dan bagiannya atas jumlah tercatat aset neto consideration paid and the relevant share
yang diperoleh dicatat dalam ekuitas. acquired of the carrying amount of net assets
Keuntungan atau kerugian atas pelepasan of the subsidiary is recorded in equity. Gains
kepada kepentingan non-pengendali juga or losses on disposals to non-controlling
dicatat pada ekuitas. interests are also recorded in equity.
iii. Pelepasan entitas anak iii. Disposal of subsidiaries
Ketika Grup kehilangan pengendalian atas When the Group loses control of a subsidiary,
entitas anak, Grup menghentikan pengakuan the Group derecognises the assets (including
aset (termasuk setiap goodwill) dan liabilitas any goodwill) and liabilities of the subsidiary at
entitas anak pada nilai tercatatnya ketika their carrying amounts as at the date on which
pengendalian hilang. Jumlah yang control is lost. Amounts previously recognised in
sebelumnya diakui dalam penghasilan other comprehensive income are also
komprehensif lain juga direklasifikasi ke laba reclassified to profit or loss or transferred directly
rugi atau dialihkan secara langsung ke saldo to retained earnings if required under other
laba jika disyaratkan oleh PSAK lain. PSAK.
Sisa investasi pada entitas anak terdahulu Any investment retained in the former subsidiary
diakui sebesar nilai wajarnya. Setiap is recognised at its fair value. The difference
perbedaan antara nilai tercatat sisa investasi between the carrying amount of the investment
pada tanggal hilangnya pengendalian dan retained at the date when the control is lost and
nilai wajarnya diakui dalam laba rugi. its fair value is recognised in profit or loss.
26
Page 29
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
iv. Restrukturisasi antar entitas sepengendali iv. Restructuring of entities under common
control
Restrukturisasi antar entitas sepengendali Restructuring of entities under common control
merupakan kombinasi dari entitas tanpa bisnis represents the combination of an entity without
yang sudah ada sebelumnya (entitas induk pre-existing business (new direct parent entity)
langsung baru) dan entitas operasi dalam and an operating entity within the same group
kelompok perusahaan yang sama dan tidak of companies and does not change the
mengubah pengendalian substantif entitas substantive control of the ultimate parent entity.
induk terakhir.
Penggabungan tersebut dicapai melalui The combination is achieved through an
akuisisi entitas operasi oleh entitas induk acquisition of an operating entity by the new
langsung baru dengan menerbitkan saham direct parent entity by issuing new shares to the
baru kepada pemegang saham pengendali previous controlling shareholders of the
sebelumnya dari entitas operasi, sebagai operating entity, in exchange for the ownership
pertukaran kepemilikan dalam entitas operasi. in the operating entity.
Restrukturisasi antar entitas sepengendali Restructuring of entities under common control
dicatat dengan menggabungkan entitas are accounted for by combining the operating
operasi ke laporan keuangan konsolidasian entity into the consolidated financial statements
entitas induk langsung baru sebesar nilai buku of the new direct parent entity at the book
tanpa peningkatan nilai wajar. Aset dan values without fair value uplift. Assets and
liabilitas yang diperoleh melalui restrukturisasi liabilities acquired through the restructuring are
dicatat oleh pihak pengakuisisi sebesar nilai recorded by the acquirer at their book values
bukunya dan selisih antara imbalan dan nilai and the difference between the consideration
buku disajikan sebagai “Tambahan modal and the book value is presented as “Additional
disetor” dan tidak didaur ulang ke laba rugi paid-in capital” and is not recycled to profit or
ketika pengendalian hilang. loss when control is lost.
Metode penyatuan kepemilikan diterapkan The pooling-of-interests method is applied as if
seolah-olah entitas telah bergabung sejak the entities had been combined from the period
periode dimana entitas yang bergabung when the merging entities were placed under
berada dalam sepengendalian. common control.
c. Penjabaran mata uang asing c. Foreign currency translation
i. Mata uang fungsional dan penyajian i. Functional and presentation currency
Akun-akun yang disertakan dalam laporan Items included in the consolidated financial
keuangan konsolidasian setiap entitas statements of each of the Group’s entities are
anggota Grup diukur menggunakan mata measured using the currency of the primary
uang dari lingkungan ekonomi utama dimana economic environment in which the relevant
entitas tersebut beroperasi (“mata uang entity operates (the “functional currency”). The
fungsional”). Laporan keuangan konsolidasian consolidated financial statements are presented
disajikan dalam Dolar Amerika Serikat (“AS$” in United States Dollars (“US$” or “US Dollars”),
atau “Dolar AS”), yang merupakan mata uang which is the Company’s functional currency and
fungsional Perusahaan dan penyajian Grup. the Group’s presentation currency.
Dalam penyusunan laporan keuangan entitas In preparing the financial statements of the
Grup, transaksi dalam mata uang selain mata Group entity, transactions in currencies other
uang fungsional entitas (mata uang asing) than the entity’s functional currency (foreign
diakui pada kurs yang berlaku pada tanggal currencies) are recognized at the rates of
transaksi. Pada setiap akhir perode exchange prevailing at the dates of the
pelaporan, pos moneter dalam valuta asing transactions. At the end of each reporting
dijabarkan kembali pada kurs yang berlaku period, monetary items denominated in foreign
pada tanggal tersebut. Pos nonmoneter yang currencies are retranslated at the rates
diukur dalam biaya historis dalam valuta asing prevailing at that date. Non-monetary items that
tidak dijabarkan kembali. are measured in terms of historical cost in a
foreign currency are not retranslated.
27
Page 30
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Pembukuan SEGDS, SEGH, OMI, SIDRAP2, The books of accounts of SEGDS, SEGH, OMI,
SUKABUMI dan LOMBOK diselenggarakan SIDRAP2, SUKABUMI and LOMBOK are
dalam Rupiah, mata uang fungsionalnya. maintained in Indonesian Rupiah, their
Untuk tujuan penyajian laporan keuangan functional currency. For the purposes of
konsolidasian, aset dan liabilitas SEGDS, presenting these consolidated financial
SEGH, OMI, SIDRAP2, SUKABUMI dan statements, the assets and liabilities of SEGDS,
LOMBOK dijabarkan ke dalam Dolar Amerika SEGH, OMI, SIDRAP2, SUKABUMI and
Serikat masing-masing dengan menggunakan LOMBOK foreign operations are translated into
kurs yang berlaku pada akhir periode U.S. Dollar using the exchange rates prevailing
pelaporan. Pos penghasilan dan beban at the end of each reporting period. Income and
dijabarkan menggunakan kurs rata-rata untuk expense items are translated at the average
periode tersebut, kecuali kurs berfluktuasi exchange rates for the period, unless exchange
secara signifikan selama periode tersebut, rates fluctuate significantly during the period, in
dalam hal ini kurs yang berlaku pada tanggal which case the exchange rates at the dates of
transaksi yang digunakan. Selisih kurs yang the transactions are used. Exchange
timbul diakui dalam penghasilan differences arising, if any, are recognized in
komprehensif lain dan diakumulasi dalam other comprehensive income and accumulatted
ekuitas (dan diatribusikan pada kepentingan in equity (and attributed to non controlling
non pengendali). interests as appropriate).
Pada konsolidasi, selisih kurs yang berasal On consolidation, exchange differences arising
dari penjabaran atas investasi bersih entitas from the translation of the net investment in
luar negeri (termasuk pos-pos moneter yang foreign entities (including monetary items that, in
secara substansi membentuk bagian substance, form part of the net investment in
investasi bersih entitas luar negeri diakui foreign entities) is recognized in other
dalam penghasilan komprehensif lain dan comprehensive income and accumulated in a
diakumulasikan dalam komponen ekuitas separate component of equity under the header
yang terpisah di bawah judul “cadangan of “foreign currency translation adjustment”.
selisih kurs penjabaran” laporan keuangan.
ii. Transaksi dan saldo ii. Transactions and balances
Transaksi dalam mata uang asing dijabarkan Foreign currency transactions are translated
menjadi mata uang fungsional menggunakan into the functional currency using the exchange
kurs yang berlaku pada tanggal transaksi. rates prevailing as at the date of the
Pada tanggal pelaporan, setiap aset dan transactions. As at the reporting date, monetary
liabilitas moneter dalam mata uang asing assets and liabilities denominated in foreign
dijabarkan ke dalam Rupiah menggunakan currency are adjusted to reflect the prevailing
kurs yang berlaku pada akhir periode exchange rates at such date. Foreign exchange
pelaporan. Keuntungan dan kerugian selisih gains and losses resulting from the settlement
kurs yang timbul dari penyelesaian transaksi of such transactions and from the translation at
dalam mata uang asing dan dari penjabaran year-end exchange rates of monetary assets
aset dan liabilitas moneter dalam mata uang and liabilities denominated in foreign currencies
asing menggunakan kurs yang berlaku pada are recognised in profit or loss.
akhir tahun pelaporan diakui dalam laba rugi.
Kurs yang digunakan pada tanggal laporan As at the consolidated statements of financial
posisi keuangan konsolidasian, berdasarkan position dates, the exchange rates used, based
kurs tengah yang diterbitkan Bank Indonesia, on the middle rates published by Bank
adalah sebagai berikut (dalam Dolar AS Indonesia, were as follows (full US Dollars
penuh): amount):
30 Juni/ 31 Desember/
June 2025 December 2024
Rupiah 10.000 (“Rp”) 0.62 0.62 Rupiah 10,000 (“IDR”)
28
Page 31
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
d. Transaksi dengan pihak berelasi d. Transaction with related parties
Pihak berelasi adalah orang atau entitas yang terkait A related party is a person or entity that is related to
dengan Grup (entitas pelapor): the Group (the reporting entity):
(a) Orang atau anggota keluarga terdekat (a) A person or a close member of that person’s
mempunyai relasi dengan entitas pelapor jika family is related to the reporting entity if that
orang tersebut: person:
(i) memiliki pengendalian atau pengendalian (i) has control or joint control over the reporting
bersama atas entitas pelapor; entity;
(ii) memiliki pengaruh signifikan atas entitas (ii) has significant influence over the reporting
pelapor; atau entity; or
(iii) adalah anggota dari personel manajemen (iii) is a member of the key management
kunci entitas pelapor atau entitas induk dari personnel of the reporting entity or of a parent
entitas pelapor. of the reporting entity.
(b) Suatu entitas berelasi dengan entitas pelapor (b) An entity is related to the reporting entity if any
jika salah satu kondisi berikut berlaku: of the following conditions applies:
(i) entitas dan entitas pelapor adalah anggota (i) the entity and the reporting entity are
dari grup yang sama (yang berarti bahwa members of the same group (which means
setiap entitas induk, entitas anak, dan that each parent, subsidiary and fellow
entitas anak berikutnya terkait satu sama subsidiary is related to each other);
lain);
(ii) satu entitas adalah entitas asosiasi atau (ii) one entity is an associate or joint venture of
ventura bersama dari entitas lain (atau the other entity (or an associate or joint
entitas asosiasi atau ventura bersama dari venture of a member of a group of which
anggota grup yang mana entitas lain the other entity is a member);
tersebut menjadi anggotanya);
(iii) kedua entitas tersebut adalah ventura (iii) both entities are joint ventures of the same
bersama dari pihak ketiga yang sama; third party;
(iv) satu entitas adalah ventura bersama dari (iv) one entity is a joint venture of a third entity
entitas ketiga dan entitas lainnya adalah and the other entity is an associate of the
entitas asosiasi dari entitas ketiga; third entity;
(v) entitas tersebut adalah suatu program (v) the entity is a post-employment benefit plan
imbalan pasca kerja untuk imbalan kerja for the benefit of the employees of either
dari salah satu entitas pelapor atau entitas the reporting entity or an entity related to
yang terkait dengan entitas pelapor. Jika the reporting entity. If the reporting entity is
entitas pelapor adalah entitas yang itself such a plan, the sponsoring
menyelenggarakan program tersebut, employers are also related to the reporting
maka entitas sponsor juga berelasi dengan entity;
entitas pelapor;
(vi) entitas yang dikendalikan atau (vi) the entity is controlled or jointly controlled
dikendalikan bersama oleh orang by a person identified in (a);
yang diidentifikasi dalam huruf (a);
(vii) orang yang diidentifikasi dalam huruf (a) (i) (vii) a person identified in (a) (i) has significant
memiliki pengaruh signifikan atas entitas influence over the entity (or is a member) of
(atau merupakan anggota) dari personel the key management personnel of the
manajemen kunci entitas (atau entitas entity (or of a parent of the entity); and
induk dari entitas); dan
(viii) entitas, atau setiap anggota dari kelompok (viii) the entity, or any member of the group of
yang menjadi bagiannya, memberikan jasa which it is a part, provides key
personel manajemen kunci kepada entitas management personnel services to the
pelapor atau kepada entitas induk dari reporting entity or to the parent of the
entitas pelapor. reporting entity.
29
Page 32
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
e. Kas dan setara kas e. Cash and cash equivalents
Kas dan setara kas termasuk kas, kas di bank dan Cash and cash equivalents consist of cash on hand,
deposito berjangka yang jatuh tempo dalam jangka cash in banks and time deposit with maturity periods
waktu tiga bulan atau kurang pada saat of three months or less at the time of placement that
penempatan yang tidak digunakan sebagai are not used as collateral or are not restricted.
jaminan atau tidak dibatasi penggunaannya.
Kas dan setara kas yang dibatasi penggunaannya Cash and cash equivalents which is restricted for
sebagaimana diatur dalam syarat-syarat perjanjian use as stipulated under the terms of a loan
pinjaman disajikan sebagai “Kas dan deposito agreement are presented as “Restricted cash and
berjangka yang dibatasi penggunaannya”. time deposits”.
f. Instrumen keuangan f. Financial instruments
Instrumen keuangan adalah setiap kontrak yang A financial instrument is any contract that gives rise
menimbulkan aset keuangan dari satu entitas dan to a financial asset of one entity and a financial
liabilitas keuangan atau instrumen ekuitas dari liability or equity instrument of another entity.
entitas lain.
i. Aset keuangan i. Financial assets
Pengakuan awal dan pengukuran Initial recognition and measurement
Aset keuangan diklasifikasikan, pada Financial assets are classified, at initial
pengakuan awal, yang kemudian diukur pada recognition, as subsequently measured at
biaya perolehan diamortisasi, nilai wajar amortised cost, fair value through other
melalui penghasilan komprehensif lain comprehensive income (“OCI”), and fair value
(“OCI”), dan nilai wajar melalui laba rugi through profit or loss (“FVTPL”).
(“FVTPL”).
Klasifikasi aset keuangan pada pengakuan The classification of financial assets at initial
awal bergantung pada karakteristik arus kas recognition depends on the financial assets’
kontraktual aset keuangan dan model bisnis contractual cash flow characteristics and the
Grup untuk mengelolanya. Pengecualian Group’s business model for managing them.
untuk piutang usaha yang tidak mengandung With the exception of trade receivables that do
komponen pembiayaan yang signifikan atau not contain a significant financing component or
yang telah diterapkan oleh Grup dengan cara for which the Group has applied the practical
praktis, Grup pada awalnya mengukur aset expedient, the Group initially measures a
keuangan pada nilai wajar ditambah, dalam financial asset at its fair value plus, in the case
hal aset keuangan tidak pada FVTPL, of a financial asset not at FVTPL, transaction
transaksi biaya. Piutang usaha yang tidak costs. Trade receivables that do not contain a
mengandung komponen pembiayaan yang significant financing component or for which the
signifikan atau yang Grup telah menerapkan Group has applied the practical expedient are
kebijaksanaan praktis diukur pada harga measured at the transaction price determined
transaksi yang ditentukan berdasarkan under PSAK 115.
PSAK 115.
Agar aset keuangan dapat diklasifikasikan dan In order for a financial asset to be classified and
diukur pada biaya perolehan diamortisasi atau measured at amortised cost or fair value
nilai wajar melalui OCI, maka perlu through OCI, it needs to give rise to cash flows
menimbulkan arus kas yang semata-mata that are solely payments of principal and
merupakan pembayaran pokok dan bunga interest (“SPPI”) on the principal amount
(“SPPI”) atas jumlah pokok terutang. Penilaian outstanding. This assessment is referred to as
ini disebut sebagai tes SPPI dan dilakukan the SPPI test and is performed at an instrument
pada tingkat instrumen. level.
30
Page 33
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Model bisnis Grup untuk mengelola aset The Group’s business model for managing
keuangan mengacu pada bagaimana Grup financial assets refers to how it manages its
mengelola aset keuangannya untuk financial assets in order to generate cash flows.
menghasilkan arus kas. Model bisnis The business model determines whether cash
menentukan apakah arus kas akan dihasilkan flows will result from collecting contractual cash
dari pengumpulan arus kas kontraktual, flows, selling the financial assets, or both.
penjualan aset keuangan, atau keduanya.
Pembelian atau penjualan aset keuangan Purchases or sales of financial assets that
yang memerlukan penyerahan aset dalam require delivery of assets within a timeframe
jangka waktu yang ditetapkan oleh peraturan established by regulation or convention in the
atau kebiasaan yang berlaku di pasar (cara marketplace (regular way trades) are
perdagangan biasa) diakui pada tanggal recognised on the trade date, i.e. the date that
perdagangan, yaitu tanggal Grup the Group commits to purchase or sell the
berkomitmen untuk membeli atau menjual asset.
aset.
Aset keuangan Grup diklasifikasikan sebagai The Group’s financial assets are classified as
aset keuangan yang selanjutnya diukur pada financial assets subsequently measured at
biaya perolehan diamortisasi yang terdiri dari amortised cost which consists of cash and cash
kas dan setara kas, kas dan deposito equivalents, restricted cash and time deposit,
berjangka yang dibatasi penggunaannya, trade and other receivables (excluding deferred
piutang usaha dan piutang lain-lain (tidak Value Added Tax (“VAT”) receivables) and
termasuk piutang Pajak Pertambahan Nilai finance lease receivables.
(“PPN”)) tangguhan dan piutang sewa
pembiayaan.
Pengukuran selanjutnya Subsequent measurement
Aset keuangan yang diukur dengan biaya Financial assets at amortised cost (debt
perolehan diamortisasi (instrumen utang) instruments)
Aset keuangan non-derivatif dengan Non-derivative financial assets with fixed or
pembayaran tetap atau telah ditentukan yang determinable payments that are not quoted in
tidak memiliki kuotasi di pasar aktif an active market are classified under this
diklasifikasikan dalam kategori ini. Grup category. The Group measures financial assets
mengukur aset keuangan pada biaya at amortised cost if both of the following
perolehan diamortisasi jika kedua kondisi conditions are met:
berikut terpenuhi:
Aset keuangan dimiliki dalam model bisnis The financial asset is held within a business
dengan tujuan untuk memiliki aset model with the objective to hold financial
keuangan untuk memperoleh arus kas assets in order to collect contractual cash
kontraktual flows
Persyaratan kontraktual aset keuangan The contractual terms of the financial asset
menimbulkan arus kas pada tanggal give rise on specified dates to cash flows
tertentu yang semata-mata merupakan that are SPPI on the principal amount
pembayaran pokok dan bunga atas jumlah outstanding
pokok terutang
Aset keuangan yang diukur dengan biaya Financial assets at amortised cost are
perolehan diamortisasi selanjutnya diukur subsequently measured using the effective
dengan menggunakan metode suku bunga interest rate (“EIR”) method and are subject to
efektif (“EIR”) dan dapat mengalami penurunan impairment. Gains and losses are recognised in
nilai. Keuntungan dan kerugian diakui dalam profit or loss when the asset is derecognised,
laba rugi ketika aset tersebut dihentikan modified or impaired.
pengakuannya, dimodifikasi atau diturunkan
nilainya.
31
Page 34
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Penghentian pengakuan Derecognition
Suatu aset keuangan (atau, jika dapat A financial asset (or, where applicable, a part of
diterapkan, bagian dari aset keuangan atau a financial asset or part of a group of similar
bagian dari kelompok aset keuangan serupa) financial assets) is generally derecognised
umumnya dihentikan pengakuannya ketika: when:
- Hak untuk menerima arus kas dari aset - The rights to receive cash flows from the
telah berakhir, atau asset have expired, or
- Grup telah mentransfer haknya untuk - The Group has transferred its rights to
menerima arus kas yang berasal dari aset receive cash flows from the asset or has
atau menanggung liabilitas untuk assumed an obligation to pay the received
membayar arus kas yang diterima tersebut cash flows in full without material delay to a
secara penuh tanpa penundaan berarti third party under a pass-through
kepada pihak ketiga di bawah kesepakatan arrangement; and either (a) the Group has
pelepasan pass-through arrangement; dan transferred substantially all the risks and
baik (a) Grup telah mentransfer secara rewards of the asset, or (b) the Group has
substansial seluruh risiko dan manfaat atas neither transferred nor retained substantially
aset, atau (b) Grup tidak mentransfer all the risks and rewards of the asset, but has
maupun tidak mempertahankan secara transferred control over the asset.
substansial seluruh risiko dan manfaat atas
aset, tetapi telah mentransfer kendali atas
aset tersebut.
Ketika Grup telah mentransfer haknya untuk When the Group has transferred its rights to
menerima arus kas dari aset atau telah receive cash flows from an asset or has entered
menandatangani pass-through arrangement, into a pass-through arrangement, it evaluates if,
mengevaluasi apakah, dan sejauh mana, and to what extent, it has retained the risks and
telah mempertahankan risiko dan manfaat rewards of ownership. When it has neither
kepemilikan. Ketika Grup tidak mentransfer transferred nor retained substantially all of the
atau tidak mempertahankan secara risks and rewards of the asset, nor transferred
substansial seluruh risiko dan manfaat atas control of the asset, the Group continues to
aset, atau tidak mentransfer kendali atas aset, recognise the transferred asset to the extent of
Grup masih mengakui aset yang ditransfer its continuing involvement. In that case, the
tersebut sejauh keterlibatannya yang Group also recognises an associated liability.
berkelanjutan. Dalam hal tersebut, Grup juga The transferred asset and the associated
mengakui liabilitas terkait. Aset yang ditransfer liability are measured on a basis that reflects the
dan liabilitas terkait diukur dasar yang rights and obligations that the Group has
mencerminkan hak dan kewajiban yang retained.
dimiliki Grup.
Penurunan nilai aset keuangan pada biaya Impairment of financial assets at amortised cost
perolehan diamortisasi
Grup mengakui penyisihan kerugian kredit The Group recognises an allowance for
ekspektasian (“ECL”) untuk semua instrumen expected credit losses (“ECL”) for all debt
utang yang tidak dimiliki di FVTPL. ECL instruments not held at FVTPL. ECL are based
didasarkan pada perbedaan antara arus kas on the difference between the contractual cash
kontraktual yang jatuh tempo sesuai dengan flows due in accordance with the contract and
kontrak dan seluruh arus kas yang diharapkan all the cash flows that the Group expects to
akan diterima oleh Grup, didiskontokan pada receive, discounted at an approximation of the
perkiraan EIR awal. Arus kas yang diharapkan original EIR. The expected cash flows will
akan mencakup arus kas dari penjualan agunan include cash flows from the sale of collateral
yang dimiliki atau peningkatan kredit lainnya held or other credit enhancements that are
yang merupakan bagian tak terpisahkan dari integral to the contractual terms.
persyaratan kontraktual.
32
Page 35
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
ECL diakui dalam dua tahap. Untuk eksposur ECL are recognised in two stages. For credit
kredit dimana tidak terdapat peningkatan risiko exposures for which there has not been a
kredit yang signifikan sejak pengakuan awal, significant increase in credit risk since initial
ECL dicadangkan untuk kerugian kredit yang recognition, ECL are provided for credit losses
diakibatkan oleh peristiwa gagal bayar yang that result from default events that are possible
mungkin terjadi dalam 12 bulan ke depan (ECL within the next 12 months (a 12-month ECL).
12 bulan). Untuk eksposur kredit yang risiko For those credit exposures for which there has
kreditnya meningkat secara signifikan sejak been a significant increase in credit risk since
pengakuan awal, penyisihan kerugian initial recognition, a loss allowance is required
diperlukan untuk kerugian kredit yang for credit losses expected over the remaining
diperkirakan selama sisa umur eksposur, life of the exposure, irrespective of the timing of
terlepas dari waktu gagal bayar (ECL seumur the default (a lifetime ECL).
hidup).
Untuk piutang usaha dan piutang lainnya, Grup For trade and other receivables, the Group
menerapkan pendekatan yang disederhanakan applies a simplified approach in calculating
dalam menghitung ECL. Oleh karena itu, Grup ECL. Therefore, the Group does not track
tidak melacak perubahan risiko kredit, namun changes in credit risk, but instead recognises a
mengakui penyisihan kerugian berdasarkan loss allowance based on lifetime ECL at each
ECL seumur hidup pada setiap tanggal reporting date. The Group has established a
pelaporan. Grup telah membentuk matriks provision matrix that is based on its historical
penyisihan yang didasarkan pada pengalaman credit loss experience, adjusted for forward-
kerugian kredit historisnya, disesuaikan dengan looking factors specific to the debtors and the
faktor-faktor berwawasan ke depan yang economic environment.
spesifik untuk debitur dan lingkungan ekonomi.
Grup menganggap aset keuangan gagal bayar The Group considers a financial asset in default
ketika pembayaran kontraktual lewat jatuh when contractual payments are 90 days past
tempo 90 hari. Namun, dalam kasus tertentu, due. However, in certain cases, the Group may
Grup juga dapat mempertimbangkan aset also consider a financial asset to be in default
keuangan sebagai default ketika informasi when internal or external information indicates
internal atau eksternal mengindikasikan bahwa that the Group is unlikely to receive the
Grup tidak mungkin menerima jumlah outstanding contractual amounts in full before
kontraktual terutang secara penuh sebelum taking into account any credit enhancements
memperhitungkan peningkatan kredit yang held by the Group. A financial asset is written off
dimiliki oleh Grup. Aset keuangan dihapuskan when there is no reasonable expectation of
ketika tidak ada harapan yang wajar untuk recovering the contractual cash flows.
memulihkan arus kas kontraktual.
ii. Liabilitas keuangan ii. Financial liabilities
Pengakuan awal dan pengukuran Initial recognition and measurement
Liabilitas keuangan diklasifikasikan, pada Financial liabilities are classified, at initial
pengakuan awal, sebagai liabilitas keuangan recognition, as financial liabilities at FVTPL,
pada FVTPL, liabilitas keuangan yang diukur financial liabilities at amortised cost or as
dengan biaya perolehan diamortisasi atau derivatives designated as hedging instruments
sebagai derivatif yang ditetapkan sebagai in an effective hedge, as appropriate.
instrumen lindung nilai dalam lindung nilai yang
efektif, sebagaimana mestinya.
Semua liabilitas keuangan pada awalnya diakui All financial liabilities are recognised initially at
pada nilai wajar dan, dalam hal liabilitas fair value and, in the case of financial liabilities
keuangan pada biaya perolehan diamortisasi, at amortised cost, net of directly attributable
setelah dikurangi biaya transaksi yang dapat transaction costs.
diatribusikan secara langsung.
Liabilitas keuangan Grup diklasifikasikan The Group’s financial liabilities are classified as
sebagai liabilitas keuangan yang selanjutnya financial liabilities subsequently measured at
diukur pada biaya perolehan diamortisasi, yang amortised cost, which consists of trade and
terdiri dari utang usaha dan utang lain-lain, other payables, accrued expenses, lease
biaya akrual, liabilitas sewa dan pinjaman. liabilities and borrowings.
33
Page 36
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Pengukuran selanjutnya Subsequent measurement
Liabilitas keuangan yang diukur dengan biaya Financial liabilities at amortised cost
perolehan diamortisasi
Setelah pengakuan awal, liabilitas keuangan After initial recognition, financial liabilities that
yang tidak dicatat pada FVTPL selanjutnya are not carried at FVTPL are subsequently
diukur pada biaya perolehan diamortisasi measured at amortised cost using the effective
dengan menggunakan metode suku bunga interest method. Gains and losses are
efektif. Keuntungan dan kerugian diakui dalam recognised in profit or loss when the liabilities
laba rugi pada saat liabilitas dihentikan are derecognised, and through the amortisation
pengakuannya, dan melalui proses process.
amortisasi.
Penghentian pengakuan Derecognition
Liabilitas keuangan dihentikan pengakuannya A financial liability is derecognised when the
ketika liabilitas tersebut dilepaskan, obligation under the liability is discharged,
dibatalkan, atau kadaluwarsa. Ketika liabilitas cancelled, or expires. When an existing
keuangan yang ada digantikan oleh yang lain financial liability is replaced by another from the
dari pemberi pinjaman yang sama dengan same lender on substantially different terms, or
persyaratan yang berbeda secara substansial, the terms of an existing liability are substantially
atau persyaratan liabilitas yang ada modified, such an exchange or modification is
dimodifikasi secara substansial, pertukaran treated as a derecognition of the original liability
atau modifikasi tersebut diperlakukan sebagai and the recognition of a new liability. The
penghentian pengakuan liabilitas awal dan difference in the respective carrying amounts is
pengakuan liabilitas baru. Selisih nilai tercatat recognised in profit or loss.
masing-masing diakui dalam laba rugi.
iii. Saling hapus antar instrumen keuangan iii. Offsetting of financial instruments
Aset dan liabilitas keuangan saling hapus dan Financial assets and liabilities are offset and
nilai netonya disajikan dalam laporan posisi their net amounts are reported in the
keuangan konsolidasian jika terdapat hak consolidated statements of financial position
yang dapat dipaksakan secara hukum untuk when there is a legally enforceable right to offset
melakukan saling hapus atas jumlah yang the recognised amounts and there is an
telah diakui tersebut dan terdapat maksud intention to settle on a net basis or realise the
untuk menyelesaikan secara neto atau untuk asset and settle the liability simultaneously.
merealisasikan aset dan menyelesaikan
liabilitas secara bersamaan.
iv. Nilai wajar instrumen keuangan iv. Fair value of financial instruments
Nilai wajar instrumen keuangan yang aktif The fair value of financial instruments that are
diperdagangkan di pasar aktif ditentukan actively traded in active markets is determined
dengan mengacu pada kuotasi harga by reference to quoted market bid prices at the
penawaran pasar pada penutupan bisnis pada close of business at the end of the reporting
akhir periode pelaporan. Untuk instrumen period. For financial instruments where there is
keuangan yang tidak memiliki pasar aktif, nilai no active market, fair value is determined using
wajar ditentukan dengan menggunakan teknik valuation techniques. Such techniques may
penilaian. Teknik tersebut dapat mencakup include using recent arm’s-length market
penggunaan transaksi pasar yang wajar baru- transactions, reference to the current fair value
baru ini, referensi ke nilai wajar saat ini dari of another instrument that is substantially the
instrumen lain yang secara substansial sama, same, discounted cash flow analysis, or other
analisis arus kas yang didiskontokan, atau valuation models.
model penilaian lainnya.
34
Page 37
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
g. Piutang g. Receivables
Piutang usaha adalah jumlah terutang dari Trade receivables are amounts due from customers
pelanggan dalam kegiatan usaha biasa. Piutang in the ordinary course of business. Non-trade
non-usaha merupakan jumlah terutang yang timbul receivables are amounts arising from transactions
dari transaksi di luar kegiatan usaha biasa. Jika outside of the ordinary course of business. If the
piutang diperkirakan tertagih dalam dua belas collection of the receivables is expected within one
bulan atau kurang, piutang tersebut year or less, they are classified as current assets. If
diklasifikasikan sebagai aset lancar. Jika tidak, not, they are presented as non-current assets in the
piutang tersebut disajikan sebagai aset tidak consolidated statements of financial position.
lancar pada laporan posisi keuangan
konsolidasian.
Piutang usaha pada awalnya diakui sebesar nilai Trade receivables are recognised initially at fair value
wajar dan kemudian diukur sebesar biaya and subsequently measured at amortised cost using
perolehan diamortisasi dengan menggunakan the effective interest method, if the impact of
metode suku bunga efektif, jika efek discounting is significant, less loss allowance.
pendiskontoan signifikan, dikurangi dengan
cadangan kerugian.
Kerugian penurunan nilai piutang disajikan Impairment losses on receivables are presented as
sebagai bagian dari beban usaha pada laba rugi. part of operating expenses in profit or loss.
Jumlah yang selanjutnya dapat dipulihkan kembali Subsequent recoveries of amounts previously
atas piutang yang sebelumnya telah written off are credited against the same line item.
dihapusbukukan, dikreditkan terhadap item baris
yang sama.
Lihat Catatan 3.f untuk informasi lebih lanjut See Note 3.f for further information regarding the
mengenai kebijakan penentuan jumlah cadangan policy on the determination of the amount for the loss
kerugian piutang Grup. allowance on the Group’s receivables.
Piutang non-usaha dari pihak berelasi pada Non-trade receivables from related parties are
awalnya disajikan sebagai aset tidak lancar kecuali initially presented as non-current assets unless there
jika ada alasan tertentu untuk disajikan sebagai are specific reasons for them to be presented as
aset lancar pada laporan posisi keuangan current assets in the consolidated statements of
konsolidasian. financial position.
h. Persediaan h. Inventories
Pipa selubung dan persediaan terkait pengeboran Casings and other drilling related items as well as
lainnya serta barang modal, dinyatakan sebesar capital spares, are stated at cost and recognised as
biaya perolehan dan diakui sebagai barang modal capital spares and equipment as part of non-current
dan peralatan sebagai bagian dari aset tidak lancar assets in the consolidated statements of financial
pada laporan posisi keuangan konsolidasian. position.
Berdasarkan ketentuan Salak JOC, persediaan Under the terms of the Salak JOC, inventory
menjadi milik pemerintah tuan rumah saat becomes the property of the host government upon
mendarat di negara tersebut. Berdasarkan landing in the country. Under the terms of the Darajat
ketentuan Darajat JOC, semua bahan dan JOC, all materials and equipment purchased under
peralatan yang dibeli berdasarkan kontrak menjadi the contract become the property of PGE (on behalf
milik PGE (atas nama Pemerintah Indonesia) of the GOI) when they are incorporated into the Field
ketika digabungkan ke dalam Fasilitas Lapangan Facilities for materials and equipment used in
untuk bahan dan peralatan yang digunakan connection with Field Facilities; and upon the expiry
sehubungan dengan Fasilitas Lapangan; dan of the contract term for materials and equipment
setelah berakhirnya jangka waktu kontrak untuk used in connection with Electricity Generation
bahan dan peralatan yang digunakan sehubungan Facilities. As the Group has paid for and has the right
dengan Fasilitas Pembangkit Listrik. Karena Grup to use these assets and/or recover the costs, these
telah membayar dan memiliki hak untuk balances have been reflected as assets in the
menggunakan aset tersebut dan/atau memperoleh consolidated statements of financial position.
kembali biayanya, saldo tersebut telah tercermin
sebagai aset dalam laporan posisi keuangan
konsolidasian.
35
Page 38
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Persediaan meliputi bahan kimia dan bahan habis Inventories include chemicals and other consumable
pakai lainnya, yang diharapkan dapat digunakan materials, which are expected to be used within one
dalam waktu satu tahun sejak tanggal akuisisi. year from the date of acquisition. Cost is determined
Biaya perolehan ditentukan berdasarkan metode based on the moving average method and includes
rata-rata bergerak dan termasuk biaya pembelian costs of purchase and other costs incurred in
dan biaya lain yang dikeluarkan untuk membawa bringing the inventories to their present location and
persediaan ke lokasi dan kondisi saat ini. condition.
Barang modal dan peralatan terdiri dari barang- Capital spares and equipment consist of items that
barang yang diperkirakan akan digunakan lebih are expected to be used more than one year from the
dari satu tahun sejak tanggal perolehan. Mereka date of acquisition. They are valued at cost and are
dinilai berdasarkan harga perolehan dan disajikan presented as non-current assets. These items are
sebagai aset tidak lancar. Pos-pos ini dicatat accounted for based on the same accounting
berdasarkan perlakuan akuntansi yang sama treatment as property, plant and equipment (Note 3.i)
seperti aset tetap (Catatan 3.i) dan properti dalam and property on operating lease (Note 3.m).
sewa operasi (Catatan 3.m).
Manajemen menilai kondisi persediaan pada Management assesses the condition of the
setiap akhir periode dan membuat penurunan nilai inventories at the end of each period and makes the
yang diperlukan. necessary write-down.
i. Aset tetap i. Property, plant and equipment
Grup menganalisis fakta dan keadaan untuk The Group analyses the facts and circumstances
masing-masing jenis tanah dan hak atas tanah for each type of land and land rights in determining
dalam menentukan akuntansi untuk masing- the accounting for each of its land rights so that it
masing hak atas tanah tersebut sehingga dapat accurately represents an underlying economic
merepresentasikan dengan tepat suatu kejadian event or transaction. If the land and land rights do
atau transaksi ekonomis yang mendasarinya. Jika not transfer control of the underlying assets, the
tanah dan hak atas tanah tersebut tidak Group applies the accounting treatment of these
mengalihkan pengendalian atas aset yang transactions as leases under PSAK116 “Leases”. If
mendasari, Grup menerapkan perlakuan akuntansi the land and land rights are substantially similar to
atas transaksi tersebut sebagai sewa berdasarkan land purchases, the Group applies PSAK 216
PSAK 116 “Sewa”. Jika tanah dan hak atas tanah “Property, plant and equipment” under which land
secara substansi menyerupai pembelian tanah, and land rights are recognised at cost and not
maka Grup menerapkan PSAK 216, “Aset tetap” depreciated.
yaitu tanah dan hak atas tanah diakui sebesar
harga perolehan dan tidak disusutkan.
Semua aset tetap pada awalnya dicatat sebesar All items of property, plant and equipment are initially
biaya perolehan. Setelah pengakuan, aset tetap recorded at cost. Subsequent to recognition, property,
diukur sebesar biaya perolehan dikurangi plant and equipment are measured at cost less
akumulasi penyusutan dan saldo defisit penurunan accumulated depreciation and any accumulated
nilai. impairment losses.
Biaya awal suatu aset terdiri dari harga beli atau The initial cost of an asset comprises its purchase
biaya konstruksinya, setiap biaya yang dapat price or construction cost, any costs directly
diatribusikan secara langsung untuk attributable to bringing the asset into operation, and
mengoperasikan aset tersebut, dan untuk aset for qualifying assets (where applicable), borrowing
kualifikasian (jika ada), biaya pinjaman. Harga costs. The purchase price or construction cost is the
pembelian atau biaya konstruksi adalah jumlah aggregate amount paid and the fair value of any
keseluruhan yang dibayarkan dan nilai wajar dari other consideration given to acquire the asset.
pertimbangan lain yang diberikan untuk
memperoleh aset tersebut.
Biaya perolehan suatu aset tetap diakui sebagai The cost of an item of property, plant and equipment
aset jika dan hanya jika, besar kemungkinan is recognised as an asset if and only if, it is probable
manfaat ekonomi masa depan yang terkait dengan that future economic benefits associated with the
aset tersebut akan mengalir ke Grup dan biaya item will flow to the Group and the cost of the item
perolehan aset tersebut dapat diukur dengan can be measured reliably.
andal.
36
Page 39
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Ketika bagian signifikan dari aset tetap harus When significant parts of property, plant and
diganti secara berkala, Grup mengakui bagian equipment are required to be replaced at intervals,
tersebut sebagai aset individual dengan masa the Group recognises such parts as individual assets
manfaat tertentu dan penyusutan. Demikian pula, with specific useful lives and depreciation,
ketika inspeksi besar dilakukan, biayanya diakui respectively. Likewise, when a major inspection is
dalam jumlah tercatat aset tetap sebagai performed, its cost is recognised in the carrying
pengganti jika kriteria pengakuan terpenuhi. amount of the property, plant and equipment as a
Semua biaya perbaikan dan pemeliharaan lainnya replacement if the recognition criteria are satisfied.
diakui dalam laba rugi pada saat terjadinya. All other repair and maintenance costs are
recognised in profit or loss as incurred.
Penyusutan dihitung dengan dasar garis lurus Depreciation is computed on a straight-line basis
selama taksiran masa manfaat aset sebagai over the estimated useful lives of the assets as
berikut: follows:
Persentase
penyusutan/
Percentage of
Tahun/Years depreciation
Hak guna tanah 30 3% Land rights
Properti 43 2% Property
Mesin, telekomunikasi Machineries, telecommunication
dan peralatan otomotif 4–5 20% – 25% and automotive equipment
Bangunan dan infrastruktur 4 – 20 5% – 25% Buildings and infrastructure
Perabotan dan perlengkapan 5 20% Furniture and fixtures
Untuk aset tetap yang dimiliki dan digunakan oleh For property, plant and equipment that are owned
entitas anak Grup yang mengoperasikan energi and used by operating geothermal energy and
panas bumi dan pembangkit listrik, masa manfaat power plant subsidiaries of the Group, useful lives
terbatas pada mana yang lebih rendah antara are limited to the lesser of the expiry date of the
tanggal berakhirnya JOC atau ESC dan masa JOC or ESC and the useful life of the asset.
manfaat aset tersebut.
Saldo “production wells” dan “well facilities” The balances of “production wells” and “well facilities”
disusutkan selama sisa umur hak partisipasi are depreciated over the remaining life of the working
dengan menggunakan metode unit produksi interest using the units-of-production (“UoP”) method
(“UoP”) sejak tanggal dimulainya operasi from the date of the commencement of commercial
komersial. Penyusutan didasarkan pada taksiran operations. The depreciation is based on estimated
cadangan uap panas bumi. Penyusutan fasilitas geothermal steam reserves. Depreciation of
produksi dan biaya sumur dihitung dengan production facilities and well costs is calculated using
menggunakan metode UoP berdasarkan ton uap the UoP method based on tonnes of steam produced
yang diproduksi selama estimasi ton uap yang over the estimated tonnes of steam to be produced
akan diproduksi selama periode pembangkitan over the Salak and Darajat generation terms.
Salak dan Darajat.
Aset dalam pembangunan tidak disusutkan Construction in progress is not depreciated until such
sampai aset yang bersangkutan selesai dan a time as the relevant assets are completed and
produksi dimulai. Pada saat aset yang production commences. When the assets concerned
bersangkutan akan digunakan, biayanya are brought into use, the costs are transferred to the
dipindahkan ke klasifikasi yang sesuai dan appropriate classification and depreciated in
disusutkan sesuai dengan kebijakan yang accordance with the stated policy.
ditetapkan.
Nilai tercatat aset tetap ditelaah untuk penurunan The carrying values of property, plant and equipment
nilai ketika peristiwa atau perubahan keadaan are reviewed for impairment when events or changes
menunjukkan bahwa nilai tercatat mungkin tidak in circumstances indicate that the carrying value may
dapat diperoleh kembali. not be recoverable.
Nilai sisa, umur manfaat dan metode penyusutan The residual value, useful life and depreciation
ditelaah setiap akhir tahun buku dan disesuaikan method are reviewed at each financial year-end, and
secara prospektif, jika sesuai. adjusted prospectively, if appropriate.
37
Page 40
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Suatu aset tetap dihentikan pengakuannya pada An item of property, plant and equipment is
saat pelepasan atau ketika tidak ada lagi manfaat derecognised upon disposal or when no future
ekonomis masa depan yang diharapkan dari economic benefits are expected from its use or
penggunaan atau pelepasannya. Setiap disposal. Any gain or loss on derecognition of the
keuntungan atau kerugian atas penghentian asset is included in profit or loss in the year the asset
pengakuan aset dimasukkan dalam laporan laba is derecognised.
rugi pada tahun aset tersebut dihentikan
pengakuannya.
j. Penurunan nilai aset non-keuangan j. Impairment of non-financial assets
Aset yang memiliki umur manfaat tidak terbatas, Assets that have an indefinite useful life, for example,
misalnya goodwill atau aset tidak berwujud yang goodwill or intangible assets not ready to use, are not
belum siap digunakan, tidak diamortisasi namun subject to amortisation but tested annually for
diuji penurunan nilainya setiap tahun, atau lebih impairment, or more frequently if events or changes
sering jika terdapat kejadian atau perubahan in circumstances indicate that the carrying amount
keadaan yang mengindikasikan bahwa nilai may not be recoverable. Assets that have a definite
tercatatnya mungkin tidak dapat dipulihkan. Aset useful life are subject to amortisation or depreciation
yang memiliki umur manfaat terbatas, diamortisasi and are reviewed for impairment whenever events or
atau didepresiasi dan diuji untuk penurunan nilai changes in circumstances indicate that the carrying
jika terdapat kejadian atau perubahaan keadaan amount may not be recoverable. An impairment loss
yang mengindikasikan bahwa nilai tercatatnya is recognised at the amount by which the asset’s
mungkin tidak dapat dipulihkan. Penurunan nilai carrying amount exceeds its recoverable amount.
diakui jika nilai tercatat aset melebihi jumlah The recoverable amount is the higher of an asset’s
terpulihkannya. Jumlah terpulihkan merupakan fair value less costs of disposal and its value in use.
jumlah yang lebih tinggi antara nilai wajar aset For the purposes of assessing impairment, assets
dikurangi biaya untuk menjual dan nilai pakai aset. are grouped at the lowest level for which there is
Dalam menentukan penurunan nilai, aset separately identifiable cash flows. Non-financial
dikelompokkan pada tingkat yang paling rendah assets other than goodwill that suffer impairment are
dimana terdapat arus kas yang dapat diidentifikasi. reviewed for possible reversal of the impairment at
Aset non-keuangan selain goodwill yang each reporting date.
mengalami penurunan nilai diuji untuk menentukan
apakah terdapat kemungkinan pemulihan
penurunan nilai, pada setiap tanggal pelaporan.
Pembalikan rugi penurunan nilai, untuk aset selain Reversal of impairment losses for assets other than
goodwill, diakui jika, dan hanya jika, terdapat goodwill is recognised if, and only if, there has been
perubahan estimasi yang digunakan dalam a change in the estimates used to determine the
menentukan jumlah terpulihkan aset sejak asset’s recoverable amount since the last
pengujian penurunan nilai terakhir kali. impairment assessment was carried out. The
Pembalikan rugi penurunan nilai tersebut diakui reversal of impairment losses will be recognised
segera dalam laba rugi. Pembalikan tersebut tidak immediately in profit or loss. The reversal should not
boleh mengakibatkan nilai tercatat aset melebihi result in the carrying amount of an asset exceeding
biaya perolehan disusutkan sebelum adanya what the depreciated cost would have been had the
pengakuan penurunan nilai pada tanggal impairment not been recognised at the date on which
pembalikan dilakukan. Rugi penurunan nilai atas the impairment was reversed. Impairment losses
goodwill tidak dibalik lagi. relating to goodwill will not be reversed.
k. Pengeluaran eksplorasi dan evaluasi panas bumi k. Geothermal exploration and evaluation
expenditure
Pengeluaran eksplorasi dan evaluasi panas bumi Geothermal exploration and evaluation expenditure
untuk setiap area of interest dipertanggung- in respect of each area of interest is accounted for
jawabkan dengan menggunakan metode using the successful efforts method of accounting.
akuntansi upaya yang berhasil. Metode upaya The successful efforts method requires all
yang berhasil mensyaratkan semua pengeluaran exploration and evaluation expenditure to be
eksplorasi dan evaluasi dibebankan sebagai biaya expensed in the period it is incurred, except the costs
pada periode terjadinya, kecuali biaya sumur yang of successful wells and the costs of acquiring
berhasil dan biaya untuk memperoleh hak atas interests in new exploration assets, which are
aset eksplorasi baru, yang dikapitalisasi sebagai capitalised as intangible exploration and evaluation
pengeluaran eksplorasi dan evaluasi yang tidak expenditure. The costs of wells are initially
berwujud. Biaya sumur awalnya dikapitalisasi capitalised pending the results of the well.
sambil menunggu hasil sumur.
38
Page 41
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Biaya pra-lisensi Pre-licence costs
Biaya pra-lisensi dibebankan pada periode Pre-licence costs are expensed in the period in
terjadinya. which they are incurred.
Lisensi dan biaya akuisisi properti Licence and property acquisition costs
Izin eksplorasi dan biaya akuisisi properti hak milik Exploration licence and leasehold property
dikapitalisasi ke dalam aset tidak berwujud. Biaya acquisition costs are capitalised within intangible
perijinan yang dibayarkan sehubungan dengan assets. Licence costs paid in connection with a
hak untuk mengeksplorasi di wilayah eksplorasi right to explore in an existing exploration area are
yang ada dikapitalisasi dan diamortisasi selama capitalised and amortised over the term of the
jangka waktu izin. Lisensi dan biaya akuisisi permit. Licence and property acquisition costs are
properti ditelaah pada setiap tanggal pelaporan reviewed at each reporting date to confirm that
untuk memastikan bahwa tidak ada indikasi bahwa there is no indication that the carrying amount
jumlah tercatat melebihi jumlah terpulihkan. exceeds the recoverable amount. This review
Tinjauan ini mencakup konfirmasi bahwa includes confirming that exploration drilling is still
pengeboran eksplorasi masih berlangsung atau under way or firmly planned, or that it has been
direncanakan dengan tegas, atau telah ditentukan, determined, or work is under way to determine, that
atau pekerjaan sedang dilakukan untuk the discovery is economically viable based on a
menentukan, bahwa penemuan tersebut layak range of technical and commercial considerations
secara ekonomi berdasarkan berbagai and sufficient progress is being made on
pertimbangan teknis dan komersial dan kemajuan establishing development plans and timing.
yang memadai sedang dilakukan untuk
menetapkan rencana dan waktu pengembangan.
Jika tidak ada kegiatan di masa depan yang If no future activity is planned or the licence has
direncanakan atau lisensi telah dilepaskan atau been relinquished or has expired, the carrying
telah berakhir, nilai tercatat lisensi dan biaya value of the licence and property acquisition costs
perolehan properti dihapuskan melalui laba rugi. is written off through profit or loss. Upon
Setelah cadangan terbukti dan persetujuan recognition of proved reserves and internal
internal untuk pengembangan diakui, pengeluaran approval for development, the relevant expenditure
yang relevan dipindahkan ke properti terbukti is transferred to proved properties in property, plant
dalam aset tetap (Catatan 3.i) dan properti dalam and equipment (Note 3.i) and property on operating
sewa operasi (Catatan 3.m). lease (Note 3.m).
Biaya eksplorasi dan evaluasi Exploration and evaluation costs
Kegiatan eksplorasi dan evaluasi melibatkan Exploration and evaluation activity involves the
pencarian sumber energi panas bumi, penentuan search for geothermal energy resources, the
kelayakan teknis dan penilaian kelayakan determination of technical feasibility and the
komersial dari sumber daya yang diidentifikasi assessment of commercial viability of an identified
resource.
Setelah hak legal untuk eksplorasi diperoleh, biaya Once the legal right to explore has been acquired,
yang terkait langsung dengan sumur eksplorasi costs directly associated with an exploration well
dikapitalisasi sebagai aset tidak berwujud are capitalised as exploration and evaluation
eksplorasi dan evaluasi sampai pengeboran sumur intangible assets until the drilling of the well is
selesai dan hasilnya telah dievaluasi. Biaya-biaya completed and the results have been evaluated.
ini termasuk remunerasi karyawan yang dapat These costs include directly attributable employee
diatribusikan secara langsung, bahan dan bahan remuneration, materials and fuel used, rig costs
bakar yang digunakan, biaya rig dan pembayaran and payments made to contractors.
yang dilakukan kepada kontraktor.
39
Page 42
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Jika energi panas bumi yang berpotensi komersial If no potentially commercial geothermal energy is
tidak ditemukan, aset eksplorasi dihapuskan discovered, the exploration asset is written off as a
sebagai sumur kering. Jika energi panas bumi dry hole. If extractable geothermal energy is found
yang dapat diekstraksi ditemukan dan, tunduk and, subject to further appraisal activity (e.g., the
pada aktivitas penilaian lebih lanjut (misalnya, drilling of additional wells), is likely to be capable of
pengeboran sumur tambahan), kemungkinan being commercially developed, the costs continue
besar dapat dikembangkan secara komersial, to be carried as an intangible asset while
biayanya tetap dianggap sebagai aset tidak sufficient/continued progress is made in assessing
berwujud sementara kemajuan yang the commerciality of the geothermal energy. Costs
memadai/berkelanjutan dibuat dalam menilai directly associated with the appraisal activity
komersialitas energi panas bumi. Biaya yang undertaken to determine the size, characteristics
terkait langsung dengan kegiatan penilaian yang and commercial potential of a reservoir following
dilakukan untuk menentukan ukuran, karakteristik the initial discovery of geothermal energy,
dan potensi komersial suatu reservoir setelah including the costs of appraisal wells where
penemuan awal energi panas bumi, termasuk geothermal energy was not found, are initially
biaya sumur penilaian di mana energi panas bumi capitalised as intangible assets.
tidak ditemukan, pada awalnya dikapitalisasi
sebagai aset tidak berwujud.
Semua biaya yang dikapitalisasi tersebut tunduk All such capitalised costs are subject to technical,
pada tinjauan teknis, komersial dan manajemen commercial and managerial review as well as
serta tinjauan untuk indikator penurunan nilai review for indicators of impairment at least once a
setidaknya sekali setahun. Ini untuk year. This is to confirm the continued intent to
mengonfirmasi niat berkelanjutan untuk develop or otherwise extract value from the
mengembangkan atau mengekstraksi nilai dari discovery. When this is no longer the case, the
penemuan. Ketika ini tidak lagi terjadi, biaya costs are written off to profit or loss.
dihapuskan ke laba rugi.
Berdasarkan ketentuan PSAK 106 “Eksplorasi dan Under the provisions of PSAK 106 “Exploration for
Evaluasi Sumber Daya Mineral”, aset eksplorasi and Evaluation of Mineral Resources”, exploration
dan evaluasi, termasuk biaya perolehan bunga and evaluation assets, including the cost of
atas aset eksplorasi baru, terus dikapitalisasi acquiring interests in new exploration assets,
sambil menunggu hasil kegiatan eksplorasi continue to be capitalised pending the results of the
berdasarkan faktor-faktor sebagai berikut: exploration activities based on the following
factors:
a) JOC di mana Grup memiliki hak untuk a) The JOCs under which the Group has the right
mengeksplorasi belum berakhir dan tidak to explore have not expired and will not expire
akan berakhir dalam waktu dekat; in the near future;
b) Pengeluaran yang signifikan untuk eksplorasi b) Significant expenditure on further exploration
lebih lanjut dan evaluasi sumber daya panas for and evaluation of geothermal resources in
bumi di wilayah tertentu dianggarkan di masa the specific area is budgeted in the future; and
mendatang; dan
c) Manajemen terus melakukan kegiatan c) Management continues to perform exploration
eksplorasi dan evaluasi di wilayah tertentu. and evaluation activities in the specific areas.
Ketika cadangan uap panas bumi terbukti When proven geothermal steam reserves are
diidentifikasi dan pengembangan disetujui oleh identified and development is sanctioned by
manajemen, pengeluaran yang dikapitalisasi management, the relevant capitalised expenditure
terkait pertama-tama dinilai penurunan nilainya is first assessed for impairment and (if required)
dan (jika diperlukan) setiap kerugian penurunan any impairment loss is recognised, then the
nilai diakui, kemudian sisanya ditransfer ke aset remaining balance is transferred to construction in
dalam pembangunan (Catatan 3.n). Selain biaya progress (Note 3.n). Other than licence costs, no
lisensi, tidak ada amortisasi yang dibebankan amortisation is charged during the exploration and
selama tahap eksplorasi dan evaluasi. evaluation phase.
40
Page 43
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
l. Aset dalam pembangunan l. Construction in progress
Akumulasi biaya pembangunan sumur dan proyek The accumulated costs of constructing wells and
perluasan pembangkit listrik dikapitalisasi sebagai power generating expansion projects are capitalised
aset dalam pembangunan. Biaya ini awalnya as construction in progress. These costs are initially
diklasifikasikan dalam aset dalam pembangunan classified in construction in progress and will be
dan akan direklasifikasi ke aset tetap (Catatan 3.i) reclassified to property, plant and equipment (Note
properti dalam sewa operasi (Catatan 3.m) dan 3.i), property on operating lease (Note 3.m) and
biaya ditangguhkan (Catatan 3.o) ketika konstruksi deferred charges (Note 3.o) when the construction or
atau pemasangan selesai dan aset siap untuk tujuan installation is completed, and the asset is ready for
penggunaannya. Penyusutan tidak dibebankan its intended use. Depreciation is not charged on
pada biaya yang dialihkan sehubungan dengan aset costs carried forward in respect of assets in
dalam tahap pengembangan sampai produksi development stage until production commences.
dimulai.
m. Properti dalam sewa operasi m. Property on operating lease
Menurut persyaratan JOC, semua bahan dan Under the terms of the JOC, all materials and
peralatan yang dibeli oleh SEGWWL dan equipment purchased by SEGWWL and
dimasukkan ke dalam fasilitas lapangan, tunduk incorporated into the field facilities, subject to liens in
pada hak gadai yang menguntungkan pemberi favour of lenders, shall become the property of PGE
pinjaman, akan menjadi milik PGE ketika when construction of such facilities has been
pembangunan fasilitas tersebut telah selesai. PGE completed. PGE has granted SEGWWL an
telah memberikan SEGWWL hak eksklusif dan tidak exclusive and irrevocable right during the term of the
dapat dibatalkan selama jangka waktu JOC untuk JOC to use, among other things, the field facilities for
menggunakan, antara lain, fasilitas lapangan untuk geothermal operations. Electricity generating
operasi panas bumi. Fasilitas pembangkit listrik facilities shall be owned and operated by SEGWWL
harus dimiliki dan dioperasikan oleh SEGWWL throughout the term of the JOC.
selama jangka waktu JOC.
Sejauh fasilitas pembangkit listrik diharuskan untuk To the extent the electricity generating facilities are
dialihkan ke PGE sesuai dengan syarat-syarat JOC required to be transferred to PGE pursuant to the
dan ESC, dan setelah pembayaran jumlah terutang terms of the JOC and the ESC, and upon payment
kepada SEGWWL berdasarkan JOC dan ESC dan of any amount owed to SEGWWL under the JOC
tunduk pada hak gadai apapun kepada pemberi and the ESC and subject to any liens to SEGWWL’s
pinjaman SEGWWL, aset tersebut, setelah lenders, such asset shall, upon termination of the
pengakhiran JOC dan ESC, akan dialihkan ke PGE JOC and ESC, be transferred to PGE on an as-is
atas dasar sebagaimana adanya. Berdasarkan ESC, basis. Under the ESC, SEGWWL is acting as the
SEGWWL bertindak sebagai kontraktor PGE untuk contractor of PGE to build, own and operate
membangun, memiliki dan mengoperasikan fasilitas electricity generating facilities and sell electricity to
pembangkit listrik dan menjual listrik ke PLN atas PLN on behalf of PGE. Under the ESC, there is no
nama PGE. Dalam ESC, tidak ada ketentuan yang provision which grants PLN the right to buy the
memberikan hak kepada PLN untuk membeli electricity generating facilities from SEGWWL.
Fasilitas Pembangkit Listrik dari SEGWWL.
Penelaahan manajemen atas pengaturan Management’s assessment of SEGWWL’s
kontraktual SEGWWL menyimpulkan bahwa contractual arrangement concluded that the
transaksi tersebut secara substansi adalah sewa transaction is in substance a lease based on PSAK
berdasarkan PSAK 116 “Sewa”. Manajemen telah 116 “Leases”. Management has determined that
menentukan bahwa pengaturan kontraktual SEGWWL’s contractual arrangement should be
SEGWWL harus dicatat sebagai sewa operasi. accounted for as an operating lease. As such, the
Dengan demikian, aset berumur panjang yang long-lived assets used in supporting its obligations
digunakan untuk mendukung kewajibannya under the contractual arrangement have been
berdasarkan perjanjian kontrak telah diklasifikasikan classified in the consolidated statements of financial
dalam laporan posisi keuangan konsolidasian position under the caption “Property on operating
dengan judul “Properti dalam sewa operasi”. lease”.
Selama periode transisi pada tanggal efektif PSAK During the transition period on the effective date of
116, manajemen telah menggunakan pengecualian PSAK 116, management has used the exemption as
karena tidak ada modifikasi terhadap pengaturan there is no modification to the previously assessed
kontraktual yang dinilai sebelumnya. contractual arrangement.
41
Page 44
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Karena pengaturan kontraktual SEGWWL berisi Since SEGWWL’s contractual arrangement contains
sewa dan biaya pelaksanaan/pemeliharaan terkait, a lease and related executory/maintenance costs,
pendapatan yang terkait dengan pengaturan revenues related to SEGWWL’s contractual
kontraktual SEGWWL diklasifikasikan ke dalam arrangement are classified into “lease revenue” and
“pendapatan sewa” dan “penjualan produk - listrik” “sale of products - electricity” based on the relative
berdasarkan metode nilai wajar relatif. fair value method.
Properti dalam sewa operasi dinyatakan sebesar Property on operating lease is stated at cost less
biaya perolehan dikurangi akumulasi penyusutan accumulated depreciation and impairment loss.
dan kerugian penurunan nilai. Biaya tersebut Such cost includes the cost of replacing part of the
termasuk biaya penggantian bagian dari properti property on operating lease when the cost is
pada sewa operasi ketika biaya tersebut terjadi, jika incurred, if the recognition criteria are met. Likewise,
kriteria pengakuan terpenuhi. Demikian pula, ketika when a major inspection is performed, its cost is
inspeksi besar dilakukan, biayanya diakui dalam recognised in the carrying amount of the property on
jumlah tercatat properti dalam sewa operasi sebagai operating lease as a replacement if the recognition
pengganti jika kriteria pengakuan terpenuhi. Semua criteria are satisfied. All other repair and
biaya perbaikan dan pemeliharaan lainnya yang maintenance costs that do not meet the recognition
tidak memenuhi kriteria pengakuan diakui dalam criteria are recognised in profit or loss as incurred.
laba rugi pada saat terjadinya.
Penyusutan properti dalam sewa operasi, kecuali Depreciation of property on operating lease, except
untuk fasilitas lapangan, dihitung dengan for field facilities, is calculated using the straight-line
menggunakan metode garis lurus selama yang lebih method over the lesser of the Wayang Windu
rendah dari Wayang Windu JOC/ESC atau taksiran JOC/ESC or their estimated useful lives, as follows:
masa manfaatnya, sebagai berikut:
Persentase
penyusutan/
Percentage of
Tahun/Years depreciation
Hak guna tanah 30 3% Land rights
Fasilitas lapangan 8 – 30 3% – 13% Field facilities
Bangunan 20 5% Buildings
Kendaraan 5 20% Vehicles
Perabotan dan perlengkapan 5 20% Furniture and fixtures
Di dalam fasilitas lapangan, sumur produksi dan Within field facilities, production wells and well
fasilitas sumur disusutkan dengan metode UoP facilities are depreciated using the UoP method
sejak tanggal dimulainya operasi komersial. UoP from the date of the commencement of commercial
dihitung berdasarkan ton uap yang dihasilkan operations. The UoP is calculated based on tonnes
selama perkiraan ton uap yang akan diproduksi of steam produced over the estimated tonnes of
selama masa pembangkitan. steam to be produced over the generation term.
Suatu aset sewa operasi dihentikan An item of property on operating lease is
pengakuannya pada saat pelepasan atau ketika derecognised upon disposal or when no future
tidak ada lagi manfaat ekonomi masa depan yang economic benefits are expected from its use or
diharapkan dari penggunaan atau pelepasannya. disposal. Any gain or loss on derecognition of the
Setiap keuntungan atau kerugian dari penghentian asset (calculated as the difference between the net
pengakuan aset (dihitung sebagai selisih antara disposal proceeds and the carrying amount of the
jumlah neto hasil pelepasan dan jumlah tercatat asset) is included in profit or loss in the year the
aset) dimasukkan dalam laba rugi pada tahun aset asset is derecognised.
tersebut dihentikan pengakuannya.
Nilai residu, umur manfaat dan metode The residual value, useful life and depreciation
penyusutan ditelaah pada setiap akhir tahun method are reviewed at each financial year-end,
keuangan, dan disesuaikan secara prospektif, jika and adjusted prospectively, if appropriate.
sesuai.
42
Page 45
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Grup mengkapitalisasi biaya untuk overhaul, The Group capitalises the cost for overhaul,
pengasaman dan intervensi sumur, karena Grup acidising and well intervention, since the Group
berkeyakinan bahwa kapitalisasi biaya ini akan believes that capitalising these costs will effectively
secara efektif menunjukkan kinerja aset dan masa demonstrate the performance of the assets and the
manfaat ekonomis untuk biaya tersebut lebih dari economic useful lives for such costs are more than
satu tahun. Grup mendepresiasi pengeluaran one year. The Group depreciates the capitalised
untuk overhaul, pengasaman, dan intervensi overhaul, acidising and well intervention
sumur yang dikapitalisasi selama periode hingga expenditure over the period until the next overhaul,
overhaul berikutnya, atau aktivitas pengasaman or the next acidising and well intervention activities
dan intervensi sumur berikutnya pada sumur yang on the same well.
sama.
n. Properti yang belum dikembangkan n. Undeveloped properties
Properti yang belum dikembangkan merupakan Undeveloped properties represent the fair value of
nilai wajar dari kepemilikan panas bumi yang undeveloped geothermal interests acquired from
belum dikembangkan yang diperoleh dari business combination.
kombinasi bisnis.
Properti yang belum dikembangkan diakui secara Undeveloped properties are recognised separately
terpisah sebagai aset tidak berwujud (Catatan 3.p), as intangible assets (Note 3.p), tested for
diuji penurunan nilainya jika terdapat indikator impairment if there is an impairment indicator and
penurunan nilai dan dicatat sebesar biaya carried at cost less any accumulated impairment
perolehan dikurangi saldo defisit penurunan nilai. losses.
Untuk setiap pengembangan yang dimulai dari For any commenced development of undeveloped
properti yang belum dikembangkan terkait dengan properties relating to geothermal resources, the
sumber daya panas bumi, jumlah properti yang developed amount of undeveloped properties will
belum dikembangkan kemudian akan then be reclassified into developed properties and
direklasifikasi menjadi properti yang telah will start to be amortised upon the completion of
dikembangkan dan akan mulai diamortisasi the development.
setelah pengembangan selesai.
o. Biaya ditangguhkan o. Deferred charges
Di bawah ESC, Grup Kontraktor diwajibkan untuk Under the ESC, the Contractor Group is required
memelihara fasilitas pembangkit listrik, termasuk to maintain the power plant facilities, including
melakukan aktivitas penggantian dan overhaul performing scheduled part replacement and
suku cadang terjadwal. Pengeluaran sehubungan overhaul activities. Expenditure related to part
dengan penggantian dan overhaul bagian replacement and overhaul of the power plant that
pembangkit listrik yang dianggap memberikan is considered to provide benefits in future periods
manfaat pada periode mendatang dicatat sebagai is recorded as deferred charges and is amortised
biaya ditangguhkan dan diamortisasi selama masa over the periods benefited using the straight-line
manfaatnya dengan menggunakan metode garis method. Deferred charges relate to “cost to fulfil a
lurus. Biaya ditangguhkan terkait dengan “biaya contract” in accordance with PSAK 115 and relate
untuk memenuhi kontrak” sesuai dengan PSAK to the performance obligation to provide overhaul
115 dan terkait dengan kewajiban kinerja untuk and maintenance of the power plant.
menyediakan overhaul dan pemeliharaan
pembangkit listrik.
Bagian utama dan bagian pendukung diamortisasi Main parts and supporting parts will be amortised
selama taksiran masa manfaat masing-masing over the estimated useful lives of ten years and five
sepuluh tahun dan lima tahun. Biaya ditangguhkan years, respectively. Deferred charges are tested
diuji penurunan nilainya sesuai dengan kebijakan for impairment in accordance with the policy
yang dijelaskan pada Catatan 3.j. described in Note 3.j.
p. Aset tidak berwujud p. Intangible assets
Aset tidak berwujud yang diperoleh secara Intangible assets acquired separately are
terpisah pada awalnya diukur sebesar biaya measured initially at cost. The cost of intangible
perolehan. Biaya aset tidak berwujud yang assets acquired in a business combination is their
diperoleh dalam kombinasi bisnis adalah nilai fair value at the date of acquisition. Following the
wajarnya pada tanggal akuisisi. Setelah perolehan initial acquisition, intangible assets are carried at
awal, aset tidak berwujud dicatat sebesar biaya cost less any accumulated amortisation and any
perolehan dikurangi akumulasi amortisasi dan accumulated impairment losses.
akumulasi kerugian penurunan nilai.
43
Page 46
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Aset tidak berwujud yang dihasilkan secara Internally generated intangible assets, excluding
internal, tidak termasuk biaya pengembangan capitalised development costs, are not capitalised
yang dikapitalisasi, tidak dikapitalisasi dan and expenditure is reflected in profit or loss in the
pengeluarannya tercermin dalam laba rugi pada year in which the expenditure is incurred.
tahun terjadinya pengeluaran tersebut.
Masa manfaat aset tidak berwujud dinilai sebagai The useful lives of intangible assets are assessed
terbatas atau tidak terbatas. as either finite or indefinite.
Aset tidak berwujud dengan masa manfaat Intangible assets with finite useful lives are
terbatas diamortisasi selama estimasi masa amortised over the estimated useful lives and
manfaat dan dinilai untuk penurunan nilainya bila assessed for impairment whenever there is an
terdapat indikasi bahwa aset tidak berwujud indication that the intangible asset may be
mungkin mengalami penurunan nilai. Periode impaired. The amortisation period and the
amortisasi dan metode amortisasi direview amortisation method are reviewed at least at each
setidaknya setiap akhir tahun buku. Perubahan financial year-end. Changes in the expected useful
ekspektasi masa manfaat atau ekspektasi pola life or the expected pattern of consumption of
konsumsi manfaat ekonomi masa depan yang future economic benefits embodied in the asset are
terkandung dalam aset dicatat dengan mengubah accounted for by changing the amortisation period
periode atau metode amortisasi, sebagaimana or method, as appropriate, and are treated as
mestinya, dan diperlakukan sebagai perubahan changes in accounting estimates. The amortisation
estimasi akuntansi. Beban amortisasi aset tidak expense on intangible assets with finite useful lives
berwujud dengan masa manfaat terbatas diakui is recognised in profit or loss.
dalam laba rugi.
Aset tidak berwujud dengan masa manfaat tidak Intangible assets with indefinite useful lives or that
terbatas atau yang belum tersedia untuk are not yet available for use are tested for
digunakan diuji penurunan nilainya setiap tahun impairment annually or more frequently if the
atau lebih sering jika peristiwa dan keadaan events and circumstances indicate that the
mengindikasikan bahwa nilai tercatatnya mungkin carrying value may be impaired either individually
mengalami penurunan nilai baik secara individu or at the cash generating unit (“CGU”) level. Such
maupun pada tingkat unit penghasil kas (“UPK”). intangible assets are not amortised. The useful life
Aset tidak berwujud tersebut tidak diamortisasi. of an intangible asset with an indefinite useful life
Masa manfaat aset tidak berwujud dengan masa is reviewed annually to determine whether the
manfaat tidak terbatas ditelaah setiap tahun untuk useful life assessment continues to be
menentukan apakah penilaian masa manfaat tetap supportable. If not, the change in useful life from
dapat didukung. Jika tidak, perubahan masa indefinite to finite is made on a prospective basis.
manfaat dari tidak terbatas menjadi terbatas
dilakukan secara prospektif.
Keuntungan atau kerugian yang timbul dari Gains or losses arising from derecognition of an
penghentian pengakuan aset tidak berwujud intangible asset are measured as the difference
diukur sebagai selisih antara jumlah neto hasil between the net disposal proceeds and the
pelepasan dan jumlah tercatat aset dan diakui carrying amount of the asset and are recognised in
dalam laba rugi pada saat aset tersebut dihentikan profit or loss when the asset is derecognised.
pengakuannya.
Goodwill Goodwill
Goodwill awalnya diukur pada biaya perolehan. Goodwill is initially measured at cost. Following
Setelah pengakuan awal, goodwill diukur sebesar initial recognition, goodwill is measured at cost less
biaya perolehan dikurangi saldo defisit penurunan any accumulated impairment losses.
nilai.
Untuk tujuan uji penurunan nilai, goodwill yang For the purpose of impairment assessment,
diperoleh dari suatu kombinasi bisnis, sejak goodwill acquired in a business combination is,
tanggal akuisisi, dialokasikan ke setiap UPK Grup from the acquisition date, allocated to each of the
yang diharapkan akan bermanfaat dari sinergi Group’s CGUs that are expected to benefit from
kombinasi tersebut, terlepas dari apakah aset atau the synergies of the combination, irrespective of
liabilitas lain dari pihak yang diakuisisi merupakan whether other assets or liabilities of the acquiree
ditugaskan ke unit-unit tersebut. are assigned to those units.
44
Page 47
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
UPK yang telah mendapatkan alokasi goodwill diuji The CGU to which goodwill has been allocated is
penurunan nilainya setiap tahun dan setiap kali tested for impairment annually and whenever there
terdapat indikasi bahwa UPK mungkin mengalami is an indication that the CGU may be impaired.
penurunan nilai. Penurunan nilai untuk goodwill Impairment is determined for goodwill by
ditentukan dengan menilai jumlah terpulihkan dari assessing the recoverable amount of each CGU
setiap UPK (atau kelompok UPK) yang terkait (or group of CGUs) to which the goodwill relates.
dengan goodwill tersebut. Jika jumlah terpulihkan Where the recoverable amount of the CGU is less
UPK lebih kecil dari nilai tercatatnya, rugi than the carrying amount, an impairment loss is
penurunan nilai diakui dalam laba rugi. Kerugian recognised in profit or loss. Impairment losses
penurunan nilai yang diakui untuk goodwill tidak recognised for goodwill are not reversed in
dibalik pada periode berikutnya. subsequent periods.
Jika goodwill merupakan bagian dari UPK dan Where goodwill forms part of a CGU and part of the
bagian dari operasi dalam UPK tersebut operation within that CGU is disposed of, the
dilepaskan, goodwill yang terkait dengan operasi goodwill associated with the operation disposed of
yang dihentikan termasuk dalam jumlah tercatat is included in the carrying amount of the operation
operasi ketika menentukan keuntungan atau when determining the gain or loss on disposal of
kerugian dari pelepasan operasi tersebut. Goodwill the operation. Goodwill disposed of in this
yang dilepas dalam keadaan ini diukur circumstance is measured based on the relative
berdasarkan nilai wajar relatif dari operasi yang fair values of the operations disposed of and the
dilepas dan porsi UPK yang dipertahankan. portion of the CGU retained.
Perangkat lunak Software
Biaya untuk memperoleh dan menyiapkan Costs to acquire and prepare software for use are
perangkat lunak untuk digunakan dicatat sebagai recorded as intangible assets and amortised on a
aset tidak berwujud dan diamortisasi dengan straight-line basis over the software’s finite useful
metode garis lurus selama masa manfaat life of five years.
perangkat lunak yang terbatas selama lima tahun.
Bonus Bonuses
Bonus merupakan pembayaran bonus kepada Bonuses represent payment of signature bonus to
Pemerintah Indonesia setelah mendapat the GOI after receiving approval of the JOC and
persetujuan dari JOC dan pembayaran bonus payment of production bonus to the GOI after the
produksi kepada Pemerintah Indonesia setelah date of commercial production. The nature of these
tanggal produksi komersial. Sifat dari pembayaran payments is similar to payments for permits for
ini mirip dengan pembayaran untuk izin eksploitasi exploitation of geothermal resources. Therefore,
sumber daya panas bumi. Oleh karena itu, Grup the Group classifies these transactions as
mengklasifikasikan transaksi ini sebagai aset tidak intangible assets and the amount will be amortised
berwujud dan jumlahnya akan diamortisasi sampai until the end of the JOC term.
dengan akhir jangka waktu JOC.
Unit karbon terverifikasi (“VCU”) dan pengurangan Verified Carbon Units (“VCU”) and Certified
emisi bersertifikat (“CER”) (“Kredit karbon”) Emission Reduction (“CER”) (“Carbon credits”)
Biaya untuk mendaftarkan Kredit karbon dicatat Costs to register the Carbon credits are recorded
sebagai aset tidak berwujud dan diakui dalam laba as intangible assets and recognised in profit or loss
rugi ketika jumlah unit yang terdaftar terjual. when the registered number of units are sold.
Biaya pengembangan proyek – pembangkit Project development costs – wind power plant
tenaga angin
Grup mengkapitalisasi biaya-biaya tertentu yang The Group capitalises certain costs incurred during
terjadi selama tahap pengembangan dalam the development stage of the project. These costs
proyek. Biaya-biaya ini terdiri dari biaya akuisisi consist of land acquisition costs, capitalised
tanah, bunga yang dikapitalisasi, biaya jasa interest, professional fees and related expenses,
profesional dan biaya terkait, izin dan biaya lainnya permits and other costs related with development
terkait dengan pengembangan proyek. Biaya yang of the project. The capitalised costs will be
dikapitalisasi akan diamortisasi selama periode amortised over a suitable period from the date of
yang sesuai dari tanggal dimulainya operasi atas commencement of commercial operation of the
proyek atau akan dibebankan sebagai beban jika project or will be charged to expense if the Group’s
manajemen Grup memutuskan biaya-biaya management determines the costs to be
tersebut tidak dapat dipulihkan. unrecoverable.
45
Page 48
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Kontrak pelanggan Customer contract
Kontrak pelanggan merupakan nilai wajar dari Customer contract represent the fair value of
kontrak dan perjanjian dengan pelanggan yang contracts and agreements with customers which
dapat memberikan sumber pendapatan berulang can provide a reliable source of recurring revenue
yang dapat diandalkan yang diperoleh dari acquired from business combination. Customer
kombinasi bisnis. Kontrak pelanggan diamortisasi contract is amortized on a straight line basis over
secara garis lurus selama masa manfaatnya yang its finite useful life of twenty three years and three
terbatas selama dua puluh tiga tahun dan tiga months.
bulan.
q. Utang usaha q. Trade payables
Utang usaha merupakan liabilitas atas barang dan Trade payables represent liabilities for goods and
jasa yang diberikan kepada Grup sebelum akhir services provided to the Group prior to the end of the
tahun buku yang belum dibayar. Mereka financial year that are unpaid. They are classified as
diklasifikasikan sebagai kewajiban lancar jika current liabilities if payment is due within one year or
pembayaran jatuh tempo dalam waktu satu tahun less. Otherwise, they are presented as non-current
atau kurang. Jika tidak, mereka disajikan sebagai liabilities.
kewajiban tidak lancar.
Utang usaha pada awalnya diakui sebesar nilai Trade payables are initially recognised at fair value,
wajar, dan selanjutnya dicatat sebesar biaya and subsequently carried at amortised cost using the
perolehan diamortisasi dengan menggunakan effective interest method.
metode suku bunga efektif.
r. Sewa r. Leases
Grup menilai apakah kontrak merupakan, atau The Group assesses at contract inception whether a
mengandung, sewa. Suatu kontrak merupakan contract is, or contains, a lease. That is, if the
atau mengandung sewa jika kontrak tersebut contract conveys the right to control the use of an
memberikan hak untuk mengendalikan identified asset for a period of time in exchange for
penggunaan aset identifikasian selama suatu consideration.
jangka waktu untuk dipertukarkan dengan imbalan.
Sebagai penyewa As a lessee
Grup menerapkan pendekatan pengakuan dan The Group applies a single recognition and
pengukuran tunggal untuk semua sewa, kecuali measurement approach for all leases, except for
sewa jangka pendek dan sewa aset bernilai short-term leases and leases of low-value assets.
rendah. Grup mengakui liabilitas untuk melakukan The Group recognises liabilities to make lease
pembayaran sewa dan aset hak guna yang payments and right-of-use assets representing the
mewakili hak untuk menggunakan aset pendasar. right to use the underlying assets.
Aset hak guna Right-of-use assets
Grup mengakui aset hak guna pada tanggal The Group recognises right-of-use assets at the
dimulainya sewa (yaitu tanggal aset pendasar commencement date of the lease (i.e. the date the
tersedia untuk digunakan). Aset hak guna diukur underlying asset is available for use). Right-of-use
sebesar biaya perolehan, dikurangi akumulasi assets are measured at cost, less any accumulated
penyusutan dan kerugian penurunan nilai, dan depreciation and impairment losses, and adjusted for
disesuaikan dengan pengukuran kembali liabilitas any remeasurement of lease liabilities. The cost of
sewa. Biaya aset hak guna mencakup jumlah right-of-use assets includes the amount of lease
liabilitas sewa yang diakui, biaya langsung awal liabilities recognised, initial direct costs incurred, and
yang dikeluarkan, dan pembayaran sewa yang lease payments made at or before the
dilakukan pada atau sebelum tanggal permulaan commencement date less any lease incentives
dikurangi dengan insentif sewa yang diterima. received.
Aset hak guna disusutkan dengan metode garis Right-of-use assets are depreciated on a straight-line
lurus selama masa sewa yang lebih pendek dan basis over the shorter of the lease term and the
estimasi masa manfaat aset tersebut. estimated useful lives of the assets.
46
Page 49
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Jika kepemilikan aset sewaan berpindah ke Grup If the ownership of the leased asset transfers to the
pada akhir masa sewa atau biaya mencerminkan Group at the end of the lease term or the cost reflects
pelaksanaan opsi beli, penyusutan dihitung the exercise of a purchase option, depreciation is
dengan menggunakan taksiran masa manfaat calculated using the estimated useful life of the asset.
aset.
Kewajiban sewa Lease liabilities
Pada tanggal dimulainya sewa, Grup mengakui At the commencement date of the lease, the Group
liabilitas sewa yang diukur pada nilai kini recognises lease liabilities measured at the present
pembayaran sewa yang akan dilakukan selama value of lease payments to be made over the lease
masa sewa. Pembayaran sewa termasuk term. The lease payments include fixed payments
pembayaran tetap (termasuk pembayaran tetap (including in-substance fixed payments) less any
dalam substansi) dikurangi piutang insentif sewa, lease incentives receivable, variable lease payments
pembayaran sewa variabel yang bergantung pada that depend on an index or a rate, and amounts
indeks atau tarif, dan jumlah yang diharapkan akan expected to be paid under residual value
dibayarkan berdasarkan jaminan nilai residu. guarantees. The lease payments also include the
Pembayaran sewa juga mencakup harga exercise price of a purchase option reasonably
pelaksanaan opsi pembelian yang secara wajar certain to be exercised by the Group and payments
pasti akan dilaksanakan oleh Grup dan of penalties for terminating a lease, if the lease term
pembayaran penalti untuk penghentian sewa, jika reflects the Group exercising the option to terminate.
masa sewa mencerminkan opsi penghentian oleh The variable lease payments that do not depend on
Grup. Pembayaran sewa variabel yang tidak an index or a rate are recognised as expenses in the
bergantung pada indeks atau kurs diakui sebagai period in which the event or condition that triggers the
beban pada periode terjadinya peristiwa atau payment occurs.
kondisi yang memicu pembayaran tersebut.
Dalam menghitung nilai kini pembayaran sewa, In calculating the present value of lease payments,
Grup menggunakan tingkat suku bunga pinjaman the Group uses the incremental borrowing rate at the
tambahan pada tanggal dimulainya sewa jika suku lease commencement date if the interest rate implicit
bunga implisit dalam sewa tidak dapat ditentukan in the lease is not readily determinable. After the
dengan mudah. Setelah tanggal dimulainya, commencement date, the amount of lease liabilities
jumlah liabilitas sewa dinaikkan untuk is increased to reflect the accretion of interest and
mencerminkan pertambahan bunga dan dikurangi reduced for the lease payments made. In addition,
untuk pembayaran sewa yang dilakukan. Selain the carrying amount of lease liabilities is remeasured
itu, nilai tercatat liabilitas sewa diukur kembali jika if there is a modification, a change in the lease term,
terdapat modifikasi, perubahan masa sewa, a change in the in-substance fixed lease payments
perubahan pembayaran sewa tetap in-substansi, or a change in the assessment to purchase the
atau perubahan penilaian untuk membeli aset underlying asset.
pendasar.
Sewa jangka pendek dan sewa aset bernilai Short-term leases and leases of low-value assets
rendah
Grup menerapkan pengecualian pengakuan sewa The Group applies the short-term lease recognition
jangka pendek untuk sewa jangka pendek atas exemption to its short-term leases of machinery and
mesin dan peralatan (yaitu, sewa yang memiliki equipment (i.e. those leases that have a lease term
masa sewa 12 bulan atau kurang sejak tanggal of 12 months or less from the commencement date
permulaan dan tidak mengandung opsi and do not contain a purchase option). It also applies
pembelian). Pengecualian pengakuan aset bernilai the lease of low-value assets recognition exemption
rendah juga berlaku untuk sewa peralatan kantor to leases of office equipment that are considered of
yang dianggap bernilai rendah (yaitu, di bawah low value (i.e. below US$5,000 – full amount). Lease
AS$5.000 – nilai penuh). Pembayaran sewa untuk payments on short-term leases and leases of low-
sewa jangka pendek dan sewa aset bernilai value assets are recognised as expenses on a
rendah diakui sebagai beban dengan dasar garis straight-line basis over the lease term.
lurus selama masa sewa.
Sebagai pesewa As a lessor
Pada awal perjanjian penjualan tenaga listrik At the inception of long-term power sales
jangka panjang, Grup menentukan apakah arrangements, the Group determines whether such
perjanjian tersebut merupakan atau mengandung an arrangement is or contains a lease.
sewa.
47
Page 50
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Sewa dimana Grup tidak mengalihkan secara Leases where the Group does not transfer
substansial seluruh risiko dan manfaat kepemilikan substantially all the risks and rewards of ownership
aset diklasifikasikan sebagai sewa operasi. Biaya of the asset are classified as operating leases. Initial
langsung awal yang dikeluarkan dalam negosiasi direct costs incurred in negotiating an operating
sewa operasi ditambahkan ke jumlah tercatat aset lease are added to the carrying amount of the leased
sewaan dan diakui selama masa sewa dengan asset and recognised over the lease term on the
dasar yang sama dengan pendapatan sewa. same basis as lease revenue. The accounting policy
Kebijakan akuntansi untuk pendapatan sewa for lease revenue is set out in Note 3.x. Contingent
dijelaskan pada Catatan 3.x. Sewa kontinjensi rents are recognised as revenue in the period in
diakui sebagai pendapatan pada periode which they are earned.
terjadinya.
Sewa di mana Grup mengalihkan secara Leases where the Group transfers to counterparties
substansial seluruh risiko dan manfaat kepemilikan substantially all the risks and rewards of ownership
aset kepada pihak lawan, tetapi bukan hak legal, of assets but not necessarily legal title, are classified
diklasifikasikan sebagai sewa pembiayaan. Ketika as finance leases. When the Group is a lessor under
Grup adalah pesewa dalam sewa pembiayaan, finance leases the amounts due under the leases,
jumlah yang terutang dalam sewa, setelah after deduction of unearned finance income, are
dikurangi pendapatan keuangan yang diterima di included in lease receivable (in the consolidated
muka, dimasukkan dalam piutang sewa (dalam statements of financial position). The finance lease
laporan posisi keuangan konsolidasian). income is recognised as finance lease income in
Pendapatan sewa pembiayaan diakui sebagai profit or loss over the periods of the leases so as to
pendapatan sewa pembiayaan pada laba rugi give a constant rate of return on the new investment
selama periode sewa sehingga memberikan in the leases.
tingkat pengembalian yang konstan atas investasi
baru dalam sewa.
Berdasarkan ketentuan JOC dan ESC Salak dan Under the terms of the Salak and Darajat JOCs and
Darajat, Grup, atas nama PGE, membangun dan ESCs, the Group, on behalf of PGE, builds and
mengoperasikan pembangkit listrik, dan operates the power plants, and delivers all power
menyalurkan semua daya (selain daya tambahan) (other than auxiliary power) generated by the power
yang dihasilkan oleh pembangkit listrik tersebut ke plants to PLN. At the end of the contract term, the
PLN. Pada akhir masa kontrak, Grup akan Group will transfer them to PGE which, in turn,
mengalihkannya ke PGE yang selanjutnya akan should transfer them to PLN.
mengalihkannya ke PLN.
Sebagai pesewa pembiayaan, Grup mengakui As a finance lessor, the Group recognises a finance
piutang sewa pembiayaan di laporan posisi lease receivable in the consolidated statements of
keuangan konsolidasian sebesar jumlah yang financial position at an amount equal to the net
sama dengan nilai investasi bersih sewa, yang investment value of the lease, which is the aggregate
merupakan jumlah agregat dari: (i) pembayaran amount of: (i) the minimum lease payments under
sewa minimum dalam sewa pembiayaan; the finance lease; plus (ii) the unguaranteed residual
ditambah (ii) nilai residu pembangkit listrik yang values of the power plants; which are then
tidak dijamin; yang kemudian didiskontokan pada discounted at the interest rate implicit in the lease.
tingkat bunga implisit dalam sewa.
Pembayaran sewa minimum merupakan total The minimum lease payments represent the total
jumlah jaminan yang akan dibayarkan oleh PLN guaranteed amounts that will be paid by PLN to
untuk mengkompensasi pemulihan biaya modal compensate the capital cost recovery of the power
pembangkit listrik selama periode kontrak, terlepas plants throughout the contract period, irrespective of
dari tingkat penggunaan. Berdasarkan ESC, Grup the extent of use. Under the ESC, the Group receives
hanya menerima satu pertimbangan untuk only one consideration for its services, i.e. one
layanannya, yaitu satu tarif listrik campuran untuk blended electricity rate to compensate all types of
mengkompensasi semua jenis layanan yang services provided by the Group to generate
diberikan oleh Grup untuk menghasilkan listrik geothermal energy-based electricity. Therefore, the
berbasis energi panas bumi. Oleh karena itu, Grup Group uses the residual value method to split the
menggunakan metode nilai residu untuk membagi consideration received from PLN into two different
imbalan yang diterima dari PLN menjadi dua activities: (i) financing activities to repay the principal
aktivitas berbeda: (i) aktivitas pembiayaan untuk and interest of the finance lease receivables; and
membayar kembali pokok dan bunga piutang sewa (ii) revenues for operating and maintenance activities
pembiayaan; dan (ii) pendapatan untuk aktivitas that are recognised as the Group delivers electricity.
operasi dan pemeliharaan yang diakui pada saat
Grup menyalurkan tenaga listrik.
48
Page 51
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Manajemen mengestimasi nilai kini bersih piutang Management estimated the net present value of the
sewa pembiayaan sebesar jumlah yang tidak finance lease receivable at an amount not to exceed
melebihi biaya modal yang dikeluarkan untuk the capital costs spent to construct and develop the
membangun dan mengembangkan pembangkit power plants. The implicit interest rate is the discount
listrik. Suku bunga implisit adalah tingkat diskonto rate that causes the aggregate present value of
yang menyebabkan nilai sekarang agregat dari minimum guaranteed payments to be equal to the
pembayaran minimum yang dijamin sama dengan carrying value of the finance lease receivables at the
nilai tercatat piutang sewa pembiayaan pada initial application date.
tanggal penerapan awal.
Piutang sewa pembiayaan diklasifikasikan menjadi The finance lease receivables are classified into
bagian lancar dan tidak lancar berdasarkan current and non-current portions based on the
periode penagihan yang diharapkan. Jumlah yang expected collection periods. Amounts that are
diharapkan dapat tertagih dalam satu tahun atau expected to be collected in one year or less are
kurang diklasifikasikan sebagai bagian dari aset classified as part of current assets; otherwise, they
lancar; jika tidak, disajikan sebagai aset tidak are presented as non-current assets.
lancar.
s. Provisi s. Provisions
Umum General
Provisi diakui ketika Grup memiliki kewajiban Provisions are recognised when the Group has a
hukum atau konstruktif masa kini sebagai akibat present legal or constructive obligation as a result of
peristiwa masa lalu, ketika kemungkinan besar a past event, when it is probable that an outflow of
arus keluar sumber daya yang mengandung resources embodying economic benefits will be
manfaat ekonomi diperlukan untuk menyelesaikan required to settle the obligation and when the amount
kewajiban tersebut dan ketika jumlah kewajiban of the obligation can be estimated reliably.
tersebut dapat diestimasi andal.
Provisi ditelaah pada setiap akhir periode Provisions are reviewed at the end of each reporting
pelaporan dan disesuaikan untuk mencerminkan period and adjusted to reflect the current best
estimasi terbaik saat ini. Jika kemungkinan besar estimate. If it is no longer probable that an outflow of
arus keluar sumber daya ekonomi tidak lagi economic resources will be required to settle the
diperlukan untuk menyelesaikan kewajiban, provisi obligation, the provision is reversed. If the effect of
dibatalkan. Jika pengaruh nilai waktu uang the time value of money is material, provisions are
material, provisi didiskontokan dengan discounted using a current pre-tax rate that reflects,
menggunakan tarif sebelum pajak kini yang where appropriate, the risks specific to the liability.
mencerminkan, jika sesuai, risiko khusus liabilitas. When discounting is used, the increase in the
Ketika pendiskontoan digunakan, kenaikan provisi provision due to the passage of time is recognised as
karena berlalunya waktu diakui sebagai biaya a finance cost.
keuangan.
Biaya pembongkaran, restorasi dan remediasi Dismantlement, restoration and remediation cost
Berdasarkan ketentuan JOC, manajemen telah Under the terms of the JOC, management has been
diberi tahu dan yakin bahwa kewajiban apapun di advised and believes that any future obligations for
masa depan untuk biaya restorasi dan remediasi site restoration and remediation costs, including
lokasi, termasuk pembongkaran pabrik dan dismantling plants and abandoning properties are
properti terbengkalai dapat diklaim dan/atau claimable and/or borne by PERTAMINA or PGE.
ditanggung oleh PERTAMINA atau PGE.
Oleh karena itu, tidak ada provisi yang diakui Accordingly, no provision has been recognised in
dalam laporan keuangan konsolidasian ini untuk these consolidated financial statements for the
operasi panas bumi. geothermal operations.
t. Pinjaman t. Borrowings
Pinjaman disajikan sebagai liabilitas jangka Borrowings are presented as current liabilities unless
pendek kecuali Grup memiliki hak tanpa syarat the Group has an unconditional right to defer
untuk menunda penyelesaian setidaknya 12 bulan settlement for at least 12 months after the reporting
setelah tanggal pelaporan. date.
49
Page 52
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Pinjaman pada awalnya diakui sebesar nilai wajar Borrowings are initially recognised at fair value (net
(setelah dikurangi biaya transaksi) dan selanjutnya of transaction costs) and subsequently carried at
dicatat sebesar biaya perolehan diamortisasi. amortised cost. Any difference between the
Selisih antara hasil (setelah dikurangi biaya proceeds (net of transaction costs) and the
transaksi) dan nilai penebusan diakui dalam laba redemption value is recognised in profit or loss over
rugi selama jangka waktu pinjaman dengan the period of the borrowings using the effective
menggunakan metode suku bunga efektif. interest method.
Ketika terdapat modifikasi arus kas kontraktual When there is a modification of contractual cash
liabilitas keuangan yang tidak mengakibatkan flows of a financial liability that does not result in
penghentian pengakuan liabilitas keuangan derecognition of that financial liability, adjustment to
tersebut, penyesuaian terhadap biaya perolehan the amortised cost of the financial liability is made to
diamortisasi liabilitas keuangan dibuat untuk reflect the changes in estimated contractual cash
mencerminkan perubahan estimasi arus kas flows. The Group determines the amortised cost of
kontraktual. Grup menentukan biaya perolehan the financial liability as the present value of the
diamortisasi liabilitas keuangan sebagai nilai kini modified estimated future contractual cash flows that
dari estimasi arus kas kontraktual masa depan is discounted at the financial instrument’s original
yang dimodifikasi yang didiskontokan pada EIR EIR. The adjustment is recognised in profit or loss as
awal dari instrumen keuangan tersebut. a gain or loss on modification of financial liabilities.
Penyesuaian tersebut diakui dalam laba rugi
sebagai keuntungan atau kerugian modifikasi
liabilitas keuangan.
u. Biaya pendanaan yang ditangguhkan u. Deferred financing costs
Biaya yang dikeluarkan untuk memperoleh Costs incurred to obtain financing are deferred and
pembiayaan ditangguhkan dan diamortisasi amortised using the effective interest method over
dengan menggunakan metode suku bunga efektif the term of the related financing agreements. The
selama jangka waktu perjanjian pembiayaan unamortised amount of deferred financing costs is
terkait. Jumlah biaya pendanaan tangguhan yang presented as a deduction of the related borrowings.
belum diamortisasi disajikan sebagai pengurang
pinjaman terkait.
v. Kompensasi dan tunjangan karyawan v. Employee compensation and benefits
i. Imbalan jangka panjang i. Long-term service benefits
Hak karyawan atas jasa dan pembayaran Employee entitlements to service and
kompensasi diakui pada saat terutang kepada compensation payments are recognised when
karyawan. Penyisihan dibuat untuk taksiran they accrue to the employees. A provision is
liabilitas sebagai akibat dari jasa masa lalu made for the estimated liability as a result of past
yang diberikan oleh karyawan sampai dengan services rendered by employees up to the end
akhir periode pelaporan dan dihitung of the reporting period and is calculated based
berdasarkan kebijakan Grup atau jumlah on the Group’s policy or a minimum amount of
minimum hak karyawan sesuai dengan employee entitlements in accordance with the
peraturan yang berlaku. applicable regulations.
Kewajiban imbalan pasti dihitung setiap tahun The defined benefit obligation is calculated
oleh aktuaris independen dengan annually by independent actuaries using the
menggunakan metode penilaian aktuaria projected unit credit actuarial valuation method.
projected unit credit. Nilai kini kewajiban The present value of the defined benefit
imbalan pasti ditentukan dengan obligation is determined by discounting the
mendiskontokan estimasi arus kas keluar estimated future cash outflows using interest
masa depan menggunakan suku bunga rates of high-quality corporate bonds that are
obligasi korporasi berkualitas tinggi yang denominated in the currency in which the
didenominasikan dalam mata uang di mana benefits will be paid and that have terms to
imbalan tersebut akan dibayarkan dan maturity approximating the terms of the related
memiliki jangka waktu jatuh tempo yang pension liability. When there is no deep market
mendekati jangka waktu kewajiban imbalan for such bonds, the market rates of Government
pasti yang terkait kewajiban pensiun. Apabila bonds are used.
tidak terdapat pasar aktif untuk obligasi
korporat tersebut, digunakan bunga obligasi
Pemerintah.
50
Page 53
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Program iuran pasti adalah program pensiun A defined contribution plan is a pension plan
yang mewajibkan Grup membayar sejumlah under which the Group pays fixed contributions
iuran tertentu kepada entitas terpisah. Grup into a separate entity. The Group has no legal or
tidak memiliki kewajiban hukum atau constructive obligations to pay further
konstruktif untuk membayar iuran lebih lanjut contributions if the fund does not hold sufficient
jika entitas tersebut tidak memiliki aset yang assets to pay all employees the benefits relating
cukup untuk membayar seluruh imbalan atas to employee service in the current and prior
jasa yang diberikan pekerja pada tahun years.
berjalan dan tahun-tahun sebelumnya.
Untuk program imbalan pasti, seluruh For defined benefit plans, all actuarial gains and
keuntungan dan kerugian aktuarial diakui di losses are recognised in OCI as part of
OCI sebagai bagian dari pengukuran kembali. remeasurement. Unvested past service costs
Biaya jasa lalu yang belum vested diakui are recognised immediately in profit or loss
segera dalam laporan laba rugi pada saat when incurred. For long-term service benefits
terjadinya. Untuk imbalan jasa jangka panjang and other long-term benefits, the Group
dan imbalan jangka panjang lainnya, Grup recognises the net total of the amounts in profit
mengakui jumlah bersih tersebut dalam laba or loss.
rugi.
Biaya jasa lalu diakui dalam laba rugi pada Past service costs are recognised in profit or
yang lebih awal dari hal-hal berikut: loss on the earlier of the following:
- tanggal amendemen atau kurtailmen - the date of the plan amendment or
program; atau curtailment; or
- tanggal dimana Grup mengakui biaya - the date that the Group recognised
terkait restrukturisasi. restructuring related costs.
Liabilitas atau aset imbalan pasti neto adalah The net defined benefit liability or asset is the
agregat nilai kini kewajiban imbalan pasti aggregate of the present value of the defined
(diperoleh dengan menggunakan tingkat benefit obligation (derived using a discount rate
diskonto berdasarkan obligasi korporasi atau based on high-quality corporate bonds or
obligasi pemerintah berkualitas tinggi untuk government bonds for employees working in
pekerja yang bekerja di Indonesia) pada akhir Indonesia) at the end of the reporting period
periode pelaporan dikurangi dengan nilai reduced by the fair value of plan assets (if any),
wajar aset program (jika ada), disesuaikan adjusted for any effect of limiting a net defined
dengan dampak pembatasan aset imbalan benefit asset to the asset ceiling. The asset
pasti neto ke batas atas aset. Batas aset ceiling is the present value of any economic
adalah nilai kini dari setiap manfaat ekonomi benefits available in the form of refunds from the
yang tersedia dalam bentuk pengembalian plan or reductions in future contributions to the
dana dari program atau pengurangan iuran plan.
masa depan untuk program tersebut.
Bunga neto atas liabilitas atau aset imbalan Net interest on the net defined benefit liability or
pasti neto diakui sebagai beban atau asset is recognised as expense or income in
pendapatan dalam laba rugi. profit or loss.
Biaya pemberian imbalan berdasarkan The cost of providing benefits under the defined
program imbalan pasti ditentukan secara benefit plans is determined separately for each
terpisah untuk setiap program dengan plan using the projected unit credit method.
menggunakan metode projected unit credit.
Biaya manfaat pasti terdiri dari: Defined benefit costs comprise the following:
- Biaya layanan; - Service cost;
- Bunga bersih atas liabilitas atau aset - Net interest on the net defined benefit
imbalan pasti bersih; dan liability or asset; and
- Pengukuran kembali liabilitas atau aset - Remeasurements of the net defined benefit
imbalan pasti neto. liability or asset.
Biaya jasa, yang meliputi biaya jasa kini, biaya Service costs, which include current service
jasa lalu dan keuntungan atau kerugian atas costs, past service costs and gains or losses on
penyelesaian tidak rutin, diakui sebagai beban non-routine settlements, are recognised as
dalam laba rugi. Biaya jasa lalu diakui pada expenses in profit or loss. Past service costs are
saat amendemen atau kurtailmen program recognised when plan amendment or
terjadi. curtailment occurs.
51
Page 54
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Pengukuran kembali, yang terdiri dari Remeasurements, comprising actuarial gains
keuntungan dan kerugian aktuarial, and losses, return on plan assets and any
pengembalian aset program dan setiap change in the effect of the asset ceiling
perubahan dampak batas atas aset (tidak (excluding net interest on a defined benefit
termasuk bunga neto atas liabilitas imbalan liability) are recognised in OCI in the period in
pasti) diakui dalam OCI pada periode which they arise. Remeasurements are
terjadinya. Pengukuran kembali diakui dalam recognised in retained earnings within equity
laba ditahan dalam ekuitas dan tidak and are not reclassified to profit or loss in
direklasifikasi ke laba rugi pada periode subsequent periods.
berikutnya.
Aset program adalah aset yang dipegang oleh Plan assets are assets that are held by a long-
dana imbalan kerja jangka panjang atau polis term employee benefit fund or qualifying
asuransi yang memenuhi syarat. Aset insurance policies. Plan assets are not available
program tidak tersedia untuk kreditur Grup, to the creditors of the Group, nor can they be
juga tidak dapat dibayarkan langsung ke paid directly to the Group. Fair value of plan
Grup. Nilai wajar aset program didasarkan assets is based on market price information.
pada informasi harga pasar. Ketika tidak ada When no market price is available, the fair value
harga pasar yang tersedia, nilai wajar aset of plan assets is estimated by discounting
program diestimasi dengan mendiskontokan expected future cash flows using a discount rate
arus kas masa depan yang diharapkan that reflects both the risk associated with the
menggunakan tingkat diskonto yang plan assets and the maturity or expected
mencerminkan risiko yang terkait dengan aset disposal date of those assets (or, if they have no
program dan tanggal jatuh tempo atau maturity, the expected period until the
perkiraan pelepasan aset tersebut (atau, jika settlement of the related obligations).
tidak memiliki jatuh tempo, jangka waktu yang
diharapkan sampai dengan penyelesaian
kewajiban yang bersangkutan).
ii. Upah, gaji dan cuti tahunan ii. Wages, salaries and annual leave
Liabilitas imbalan kerja untuk upah, gaji dan Liabilities for employee benefits for wages,
cuti tahunan yang diperkirakan akan salaries and annual leave that are expected to
diselesaikan dalam waktu 12 bulan sejak akhir be settled within 12 months from the end of the
periode pelaporan merupakan kewajiban kini reporting period represent present obligations
akibat jasa yang diberikan karyawan hingga resulting from employees’ service provided to
akhir periode pelaporan dan dihitung the end of the reporting period and are
berdasarkan jumlah yang tidak didiskonto calculated at undiscounted amounts based on
tentang remunerasi tingkat upah dan gaji yang remuneration wage and salary rates that the
diperkirakan akan dibayarkan oleh Grup pada Group expects to pay as at the end of the
akhir periode pelaporan termasuk biaya reporting period including related add on-costs.
tambahan terkait.
iii. Pesangon pemutusan kontrak kerja iii. Termination benefits
Pesangon pemutusan kontrak kerja Termination benefits are payable when
dibayarkan ketika pekerja diberhentikan, atau employment is terminated by the Group before
ketika pekerja menerima penawaran the normal retirement date, or when an
mengundurkan diri secara sukarela. Grup employee accepts voluntary redundancy in
mengakui pesangon pemutusan kontrak kerja exchange for certain benefits. The Group
pada tanggal yang lebih dahulu dari: (i) ketika recognises termination benefits at the earlier of
Grup tidak bisa lagi membatalkan penawaran the following dates: (i) when the Group can no
pesangon; dan (ii) ketika Grup mengakui longer withdraw the offer of those benefits; and
biaya untuk restrukturisasi yang berada dalam (ii) when the Group recognises costs for a
lingkup PSAK 237 “Provisi, Liabilitas restructuring that is within the scope of PSAK
Kontinjensi dan Aset Kontinjensi pesangon 237 “Provisions, Contingent Liabilities and
pemutusan kontrak kerja. Dalam hal Contingent Assets” and involves in the payment
penawaran pengunduran diri secara sukarela, of termination benefits. In the case of an offer
pesangon pemutusan kontrak kerja diukur made to encourage voluntary redundancy, the
berdasarkan ekspektasi jumlah karyawan termination benefits are measured based on the
yang menerima penawaran tersebut. number of employees expected to accept the
Pesangon pemutusan kontrak kerja yang offer. Benefits falling due more than 12 months
jatuh tempo lebih dari 12 bulan setelah after the reporting date are discounted to their
tanggal pelaporan didiskontokan ke nilai kini. present value.
52
Page 55
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
w. Modal saham w. Share capital
Saham biasa dikelompokkan sebagai ekuitas dan Ordinary shares are classified as equity and
biaya langsung yang berkaitan dengan penerbitan incremental costs directly attributable to the issuance
saham baru atau opsi disajikan sebagai pengurang of new shares or options are shown in equity as a
ekuitas, setelah dikurangi pajak, dari jumlah yang deduction, net of tax, from the proceeds.
diterima.
x. Pengakuan pendapatan dan beban x. Revenue and expense recognition
Pendapatan dari kontrak dengan pelanggan Revenue from contracts with customers
Grup beroperasi sumber energi panas bumi di The Group operates geothermal and wind energy
pulau Jawa di Indonesia dan seluruh produksi resource areas on the island of Java and Sulawesi in
listrik dan uap Grup dijual ke PLN sampai dengan Indonesia and all of the Group’s electricity and steam
akhir ESC. Manajemen menentukan bahwa production are sold to PLN up to the end of the ESC
kontrak Grup dengan PLN mengandung sewa dan and PPA for geothermal and wind energy,
harus dicatat sebagai sewa operasi (Catatan 3.m) respectively. Management determined that the
atau sewa pembiayaan (Catatan 3.r). Dengan Group’s contracts with PLN contain a lease and should
demikian, pendapatan dari kontrak dengan PLN be accounted for as either an operating lease (Note
dialokasikan antara pendapatan listrik dan 3.m) or a finance lease (Note 3.r). As such, revenue
pendapatan sewa berdasarkan nilai wajar relatif from the contract with PLN is allocated between
dari setiap komponen pendapatan. electricity revenue and lease revenue based on the
relative fair value of each revenue component.
Pendapatan listrik merupakan bagian dari Electricity revenue represents the portion of revenue
pendapatan yang memulihkan operasi dan that recovers the operation and maintenance of the
pemeliharaan pembangkit listrik sementara power plants while lease revenue and finance lease
pendapatan sewa dan pendapatan sewa income represent the portion of revenue that recovers
pembiayaan merupakan bagian dari pendapatan the investment in the power plants. Electricity revenue
yang memulihkan investasi di pembangkit listrik. and steam revenue are recognised in accordance with
Pendapatan listrik dan pendapatan uap diakui PSAK 115 “Revenue from Contracts with Customers”,
sesuai dengan PSAK 115 “Pendapatan dari while operating lease income and finance lease
Kontrak dengan Pelanggan”, sedangkan income are recognised in accordance with PSAK 116
pendapatan sewa operasi dan pendapatan sewa “Leases”.
pembiayaan diakui sesuai dengan PSAK 116
“Sewa”.
Pendapatan dari kontrak dengan pelanggan Revenue from contracts with customers is recognised
diakui ketika kewajiban pelaksanaan dipenuhi when the performance obligation is satisfied by
dengan mengalihkan barang atau jasa yang transferring the promised good or service to a
dijanjikan kepada pelanggan (yaitu ketika customer (which is when the customer obtains control
pelanggan memperoleh kendali atas barang atau of that good or service). The Group has generally
jasa tersebut). Grup secara umum menyimpulkan concluded that it is the principal in its revenue
bahwa mereka adalah prinsipal dalam pengaturan arrangements because it typically controls the goods
pendapatannya karena pada umumnya Grup or services before transferring them to the customer.
mengendalikan barang atau jasa sebelum The Group uses a five-step model to account for
mengalihkannya kepada pelanggan. Grup revenue arising from contracts with customers and
menggunakan model lima langkah untuk requires that revenue be recognised at an amount that
mencatat pendapatan yang timbul dari kontrak reflects the consideration to which an entity expects to
dengan pelanggan dan mensyaratkan bahwa be entitled in exchange for transferring goods or
pendapatan diakui pada suatu jumlah yang services to a customer.
mencerminkan pertimbangan yang diharapkan
menjadi hak entitas dalam pertukaran untuk
pengalihan barang atau jasa kepada pelanggan.
Grup mempertimbangkan apakah terdapat janji The Group considers whether there are other promises
lain dalam kontrak yang merupakan kewajiban in the contract that are separate performance
pelaksanaan terpisah yang harus dialokasikan obligations to which a portion of the transaction price
sebagian dari harga transaksi. Dalam menentukan needs to be allocated. In determining the transaction
harga transaksi untuk pendapatan tenaga listrik, price for the electricity revenue, the Group considers
Grup mempertimbangkan pengaruh imbalan the effect of variable consideration, the existence of
variabel, adanya komponen pembiayaan yang significant financing components, non-cash
signifikan, imbalan non-tunai, dan imbalan yang consideration, and consideration payable to PLN.
harus dibayarkan kepada PLN.
53
Page 56
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Grup mengevaluasi off-take agreements (ESC) The Group evaluated SEGSL’s and SEGSPL’s off-
SEGSL dan SEGSPL dan menentukan bahwa take agreements (ESC) and determined that the
imbalan yang diterima atau piutang dari PLN consideration received or receivable from PLN
berdasarkan pada jumlah yang ditagih based on invoiced amounts contains an additional
mengandung kewajiban kinerja tambahan performance obligation (set-off mechanism) whereby
(mekanisme set-off) dimana jika SEGSL dan if SEGSL and SEGSPL subsequently deliver to PLN
SEGSPL selanjutnya menyerahkan kepada PLN the quantities of electricity and geothermal energy
jumlah listrik dan energi panas bumi yang that PLN previously was not able to accept, the
sebelumnya tidak dapat diterima oleh PLN, consideration previously received or receivable from
imbalan yang diterima atau dapat diterima PLN will be utilised towards payment for such
sebelumnya dari PLN akan digunakan untuk quantities of electricity or geothermal energy
pembayaran jumlah listrik atau energi panas bumi delivered by SEGSL and SEGSPL (Note 3.y and 17).
yang diserahkan oleh SEGSL dan SEGSPL
(Catatan 3.y dan 17).
Grup juga mengevaluasi off-take agreement The Group also evaluated SEGWWL’s and the
(ESC) SEGWWL dan Kelompok Kontraktor Darajat Contractor Group’s off-take agreements
Darajat dan menentukan bahwa kontrak tersebut (ESCs) and determined that the contracts do not
tidak memiliki pertimbangan variabel seperti hak have variable considerations such as rights of return
imbalan dan rabat volume, dan tidak memiliki and volume rebates, and have no significant
komponen pembiayaan yang signifikan, imbalan financing component, non-cash consideration and
non-tunai dan imbalan yang dibayarkan kepada consideration payable to customers.
pelanggan.
Grup juga mengevaluasi power purchase The Group also evaluated SBE’s power purchase
agreement (PPA) dan menentukan bahwa kontrak agreement (PPA) and determined that the contracts
tersebut tidak memiliki pertimbangan variabel do not have variable considerations such as rights of
seperti hak imbalan dan rabat volume, dan tidak return and volume rebates, and have no significant
memiliki komponen pembiayaan yang signifikan, financing component, non-cash consideration and
imbalan non-tunai dan imbalan yang dibayarkan consideration payable to customers.
kepada pelanggan.
Pendapatan listrik Electricity revenue
Pendapatan listrik diakui dari waktu ke waktu pada Electricity revenue is recognised over time when the
saat kendali keluaran listrik dialihkan ke PLN pada control of the electrical output is transferred to PLN
saat penyerahan. Kuantitas yang dikirim which is upon delivery. Quantities delivered are
ditentukan melalui meteran pengukuran listrik di determined through electrical measurement meters
titik pengiriman. Jangka waktu kredit normal at the delivery point. The normal credit term is 30-45
adalah 30-45 hari setelah diterbitkannya tagihan days upon issue of the invoice by the Group to PLN.
oleh Grup kepada PLN.
Pendapatan uap Steam revenue
Pendapatan uap diakui dari waktu ke waktu ketika Steam revenue is recognised over time when control
kendali keluaran uap dialihkan ke PLN, yaitu pada of steam output is transferred to PLN, which is upon
saat pengiriman. Kuantitas yang dikirim ditentukan delivery. Quantities delivered are determined
melalui meteran pengukuran listrik pada titik through electrical measurement meters at the point
antarmuka (untuk uap) dengan PLN (“titik of interface (for steam) with PLN (the “delivery
pengiriman”). Penjualan energi panas bumi dicatat point”). Geothermal energy sales are recorded on the
berdasarkan harga yang ditentukan dengan basis of prices determined by certain formulas in
formula tertentu sesuai dengan ESC (Catatan 1.c). accordance with the ESC (Note 1.c).
Pendapatan kredit karbon Carbon credit revenue
Pendapatan kredit karbon diakui pada waktu Carbon credit revenue is recognised at a point in time
tertentu setelah penjualan unit CER dan Voluntary upon sale of CER and Voluntary Emission Reduction
Emission Reduction (“VER”) kepada pelanggan. (“VER”) units to the customer. Based on
Berdasarkan penilaian manajemen, transaksi management’s assessment, the Group’s carbon
kredit karbon Grup tidak memiliki pertimbangan credit transactions have no variable consideration
variabel seperti hak imbalan dan rabat volume, such as rights of return and volume rebates, and no
dan tidak ada komponen pembiayaan yang significant financing component, non-cash
signifikan, imbalan non-tunai, dan imbalan yang consideration, and consideration payable to the
harus dibayarkan kepada pelanggan. customer.
Pendapatan sewa operasi Operating lease income
Pendapatan sewa operasi diakui dengan dasar Operating lease income is recognised on a straight-
garis lurus selama masa sewa sesuai dengan line basis over the lease term in accordance with
PSAK 116 “Sewa”. PSAK 116 “Leases”.
54
Page 57
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Pendapatan sewa pembiayaan Finance lease income
Pendapatan sewa pembiayaan diakui untuk Finance lease income is recognised for all the
semua jasa yang diberikan oleh Grup berdasarkan services provided by the Group under the build, own,
pengaturan bangun, miliki, operasikan dan serah operate and transfer arrangement for the Salak and
untuk operasi pembangkit listrik Salak dan Darajat power plant operations, which include
Darajat, termasuk pendapatan untuk revenues for the construction of the power plants
pembangunan pembangkit listrik (melalui (through the recognition of finance lease receivable).
pengakuan piutang sewa pembiayaan).
Grup mengalokasikan imbalan yang diterimanya The Group allocates the consideration that it
untuk setiap kWh listrik yang dialirkan ke PLN receives for each kWh of electricity delivered to PLN
menjadi dua kategori: pembayaran pokok dan into two categories: repayments of principal and
bunga piutang sewa pembiayaan; dan interest of the finance lease receivables; and
pendapatan produksi tenaga listrik, operasi dan revenues for the production of electricity, operation
pemeliharaan pembangkit tenaga listrik disajikan and maintenance of the power plants presented as
sebagai pendapatan tenaga listrik pada laba rugi. electricity revenue in profit or loss. The Group uses
Grup menggunakan metode nilai residu untuk the residual value method to allocate the total
mengalokasikan total imbalan yang diterima dari consideration received from PLN between revenues
PLN antara pendapatan untuk aktivitas for the financing, operating and maintenance
pembiayaan, operasi dan pemeliharaan. activities. Finance lease income is recognised based
Pendapatan sewa pembiayaan diakui on a pattern reflecting a constant periodic rate of
berdasarkan pola yang mencerminkan tingkat return on the Group’s outstanding finance lease
pengembalian periodik yang konstan atas saldo receivables balance.
piutang sewa pembiayaan Grup.
Pendapatan sewa pembiayaan diakui sesuai Finance lease income is recognised in accordance
dengan PSAK 116 “Sewa”. with PSAK116 “Leases”.
Biaya Expenses
Beban diakui dengan basis akrual pada saat Expenses are recognised on an accrual basis as
terjadinya. incurred.
y. Saldo make-up account PLN y. PLN make-up account balances
Saldo make-up account PLN merupakan jumlah PLN make-up account balances represent the
kumulatif dimana listrik dan/atau uap yang cumulative amount by which the electricity and/or
dibayarkan oleh PLN kepada Kontraktor steam paid by PLN to the Contractors based on the
berdasarkan mekanisme take-or pay di ESC Salak take-or pay mechanism in the Salak ESC exceeds
melebihi jumlah uap dan/atau listrik yang benar- the amount of steam and/or electricity actually
benar diterima oleh PLN dikurangi listrik dan/atau accepted by PLN minus electricity and/or steam
uap yang diserahkan oleh Grup sesuai dengan delivered by the Group pursuant to the take-or-pay
jumlah take-or-pay. Sesuai dengan PSAK 115, jika amount. In accordance with PSAK 115, if PLN pays
PLN membayar imbalan sebelum Grup consideration before the Group transfers electricity
mentransfer listrik dan uap ke pelanggan, saldo and steam to the customer, PLN make-up account
make-up account PLN diakui pada saat balances are recognised when the payment is made
pembayaran dilakukan atau saat pembayaran or when the payment is due (whichever is earlier).
jatuh tempo (mana yang lebih dulu). Apabila When the Contractors deliver steam and/or electricity
Kontraktor melakukan penyerahan uap dan/atau which reduces the balance of PLN make-up account
listrik yang mengurangi saldo make-up account balances in accordance with the ESC, then such
PLN sesuai dengan ESC, maka penyerahan delivery shall be recognised as revenue under
tersebut diakui sebagai pendapatan berdasarkan PSAK 115.
PSAK 115.
Dengan pengakhiran Salak JOC, hak dan Upon termination of the Salak JOC, SEGSL’s and
kewajiban SEGSL dan SEGSPL (termasuk saldo SEGSPL’s rights and obligations (including make-up
make-up account PLN), sebagai pihak ESC, account balances to PLN), as a party to the ESC, in
dalam perannya sebagai Kontraktor PGE untuk their role as Contractor to PGE for the delivery of
pengiriman energi panas bumi atau listrik ke PLN, geothermal energy or electricity to PLN, shall
harus diakhiri dan PGE akan menanggung semua terminate and PGE shall assume all the rights and
hak dan kewajiban SEGSL dan SEGSPL sesuai obligations of SEGSL and SEGSPL pursuant to this
dengan ESC ini pada tanggal penghentian ESC upon the date of such termination.
tersebut.
55
Page 58
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
z. Pajak penghasilan z. Income tax
Beban pajak terdiri dari pajak kini dan pajak Tax expense comprises current and deferred tax.
tangguhan. Pajak diakui dalam laba rugi, kecuali Tax is recognised in profit or loss, except to the extent
jika pajak itu terkait dengan kejadian atau transaksi that it relates to items recognised in other
yang diakui di penghasilan komprehensif lain atau comprehensive income or directly in equity. In this
langsung diakui ke ekuitas. Dalam hal ini, beban case, the tax expense is recognised in other
pajak tersebut masing-masing diakui pada comprehensive income or directly in equity, or as
penghasilan komprehensif lain atau secara regulated in the JOCs of the Group’s subsidiaries,
langsung dicatat ke ekuitas, atau sebagaimana respectively.
diatur dalam JOC anak perusahaan Grup.
Pajak penghasilan kini diakui dalam laba rugi Current income taxes are recognised in profit or loss
kecuali untuk pajak yang berkaitan dengan pos- except to the extent that the tax relates to items
pos yang diakui di luar laba rugi, baik dalam recognised outside profit or loss, either in other
penghasilan komprehensif lain atau secara comprehensive income or directly in equity.
langsung dalam ekuitas. Manajemen secara Management periodically evaluates positions taken
berkala mengevaluasi posisi yang diambil dalam in the tax returns with respect to situations in which
surat pemberitahuan pajak sehubungan dengan applicable tax regulations are subject to
situasi di mana peraturan perpajakan yang berlaku interpretation and establishes provisions where
diinterpretasikan dan menetapkan provisi jika appropriate.
diperlukan.
Pajak tangguhan disajikan dengan menggunakan Deferred tax is provided using the liability method on
metode liabilitas atas perbedaan temporer pada temporary differences at the end of the reporting
akhir periode pelaporan antara dasar pengenaan period between the tax bases of assets and liabilities
pajak aset dan liabilitas dan nilai tercatatnya untuk and their carrying amounts for financial reporting
tujuan pelaporan keuangan. purposes.
Liabilitas pajak tangguhan diakui untuk semua Deferred tax liabilities are recognised for all
perbedaan temporer, kecuali jika liabilitas pajak temporary differences, except where the deferred tax
tangguhan timbul dari pengakuan awal goodwill liability arises from the initial recognition of goodwill
atau aset atau liabilitas dalam transaksi yang or of an asset or liability in a transaction that is not a
bukan kombinasi bisnis dan pada saat transaksi business combination and at the time of the
tidak mempengaruhi laba akuntansi atau laba transaction, affects neither the accounting profit nor
kena pajak atau rugi kena pajak. taxable profit or loss.
Nilai tercatat aset pajak tangguhan ditelaah pada The carrying amount of deferred tax assets is
setiap akhir periode pelaporan dan dikurangi reviewed at the end of each reporting period and
apabila kemungkinan laba kena pajak tidak lagi reduced to the extent that it is no longer probable that
mencukupi untuk memungkinkan seluruh atau sufficient taxable profit will be available to allow all or
sebagian dari aset pajak tangguhan dapat part of the deferred tax assets to be utilised.
digunakan.
Aset dan liabilitas pajak tangguhan diukur dengan Deferred tax assets and liabilities are measured at
tarif pajak yang diharapkan akan berlaku pada the tax rates that are expected to apply in the year
tahun ketika aset tersebut direalisasikan atau when the asset is realised or the liability is settled,
liabilitas diselesaikan, berdasarkan tarif pajak (dan based on tax rates (and tax laws) that have been
undang-undang perpajakan) yang telah berlaku enacted or substantively enacted at the end of each
atau secara substantif telah berlaku pada akhir reporting period.
tahun setiap periode pelaporan.
Pajak tangguhan terkait pos-pos yang diakui di Deferred tax relating to items recognised outside
luar laba rugi diakui di luar pajak penghasilan. Pos profit or loss is recognised outside income tax.
pajak tangguhan diakui secara korelasi dengan Deferred tax items are recognised in correlation to
transaksi yang mendasarinya baik dalam the underlying transaction either in OCI or directly in
penghasilan komprehensif lain atau secara equity and deferred tax arising from a business
langsung di ekuitas dan pajak tangguhan yang combination is adjusted against goodwill on
timbul dari kombinasi bisnis disesuaikan terhadap acquisition.
goodwill pada saat akuisisi.
Aset pajak tangguhan dan liabilitas pajak Deferred tax assets and deferred tax liabilities are
tangguhan saling hapus jika terdapat hak yang offset if a legally enforceable right exists to set off
berkekuatan hukum untuk saling hapus aset pajak current income tax assets against current income tax
penghasilan kini terhadap liabilitas pajak kini dan liabilities and the deferred tax relate to the same
pajak tangguhan tersebut terkait dengan entitas taxable entity and the same taxation authority.
kena pajak yang sama dan otoritas perpajakan
yang sama.
56
Page 59
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
aa. Laba per saham aa. Earnings per share
Laba per saham dasar dihitung dengan membagi Basic earnings per share is calculated by dividing
laba yang dapat diatribusikan kepada pemegang profit for the period attributable to the equity holders
saham Perusahaan dengan jumlah rata-rata of the Company by the weighted-average number of
tertimbang saham biasa yang beredar pada ordinary shares outstanding during the period.
periode berjalan.
Laba per saham dilusian dihitung dengan Diluted earnings per share is calculated by adjusting
menyesuaikan rata-rata tertimbang jumlah saham the weighted average number of ordinary shares
biasa yang beredar untuk mengasumsikan outstanding to assume conversion of all dilutive
konversi seluruh potensi saham biasa yang dilutif. potential ordinary shares.
ab. Laporan segmen ab. Segment reporting
Segmen operasi dilaporkan dengan cara yang Operating segments are reported in a manner
konsisten dengan pelaporan internal yang consistent with the internal reporting provided to the
diberikan kepada pengambil keputusan chief operating decision-maker. The Board of
operasional. Direksi adalah pengambil keputusan Directors is the chief operating decision-maker, who
operasi utama, yang bertanggung jawab untuk is responsible for allocating resources and assessing
mengalokasikan sumber daya dan menilai kinerja performance of the operating segments and making
segmen operasi dan membuat keputusan strategic decisions.
strategis.
ac. Pembagian dividen ac. Dividend distributions
Pembagian dividen kepada pemegang saham Dividend distributions to the Company’s
Perusahaan diakui sebagai liabilitas dalam shareholders are recognised as liabilities in the
laporan keuangan konsolidasian dalam periode consolidated financial statements in the period when
ketika pembagian dividen telah diumumkan. the dividends are declared.
ad. Akuntansi JOC ad. JOC accounting
Perbedaan utama antara akuntansi JOC yang The primary differences between JOC accounting
digunakan dalam perhitungan pajak penghasilan which is used in income tax calculations and PSAK
dan PSAK adalah sebagai berikut: are as follows:
Kebijakan akuntansi/ Dasar akuntansi JOC/ PSAK/
Accounting policy JOC basis of accounting PSAK
Pendapatan listrik/ Pendapatan diakui berdasarkan Untuk SEGWWL, SEGSPL, SEGD-I,
Electricity revenue output listrik yang dikirim ke SEGD-II dan DGI, menggunakan
PLN/Revenue recognised metode nilai residu untuk
based on electrical output membagi imbalan yang diterima
delivered to PLN dari PLN menjadi dua aktivitas
berbeda: (i) aktivitas pembiayaan
untuk membayar pokok dan
bunga piutang sewa pembiayaan;
dan (ii) pendapatan untuk aktivitas
operasi dan pemeliharaan yang
diakui pada saat Grup
menyalurkan tenaga listrik/For
SEGWWL, SEGSPL, SEGD-I,
SEGD-II and DGI, uses the
residual value method to split the
consideration received from PLN
into two different activities:
(i) financing activities to repay the
principal and interest of the
finance lease receivables; and
(ii) revenues for operating and
maintenance activities that are
recognised as the Group delivers
electricity
Amortisasi biaya modal/ Depresiasi dipercepat (saldo Berbagai metode penyusutan
Amortisation of capital costs menurun) menggunakan (termasuk metode unit produksi)
penyusutan setahun penuh menggunakan sebagian kecil dari
57
Page 60
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Kebijakan akuntansi/ Dasar akuntansi JOC/ PSAK/
Accounting policy JOC basis of accounting PSAK
pada tahun perolehan/ penyusutan satu tahun pada
Accelerated depreciation tahun perolehan/Various
(declining balance) using a depreciation methods (including
full year’s depreciation in the units of production method) using
year of acquisition a fraction of a year’s depreciation
in the year of acquisition
Persediaan usang atau fasilitas Dihapuskan hanya jika disetujui Biaya saat diidentifikasi/Expense
yang sedang tidak oleh PGE/Written-off only when identified
digunakan/Obsolete stores when approved by PGE
or idle facilities
Kewajiban kontinjensi/ Diakui ketika diselesaikan atau Diungkapkan dalam laporan
Contingent liabilities disetujui oleh PGE/ keuangan dan diakui ketika
Recognised when settled or memenuhi kriteria tertentu dalam
approved by PGE PSAK 237/ Disclosed in the
financial statements and
recognised when meeting certain
criteria in PSAK 237
Pajak tangguhan/ Tidak disediakan/Not provided Metode liabilitas/Liability method
Deferred tax
Biaya eksplorasi dan Dibebankan/Expensed Dikapitalisasi/Capitalised
pengembangan tidak
berwujud – sumur yang
sukses/Intangible
exploration and development
costs – successful wells
Pengembangan sumur kering/ Dibebankan/ Expensed Awalnya dikapitalisasi kemudian
Development dry holes dibebankan jika tidak berhasil/
Initially capitalised then expensed
if not successful
Kewajiban pembongkaran/ Diakui saat dibayar atau didanai/ Diakui sebagai liabilitas jika terdapat
Abandonment obligation Recognised when paid or kewajiban hukum atau konstruktif/
funded Recognised as a liability where
there is a legal or constructive
obligation
Penurunan nilai aset/Asset Tidak ada penghapusan sampai Penghapusan kelebihan nilai
impairment proposal pengabaian tercatat aset atas jumlah
disetujui oleh PGE untuk terpulihkan ketika penurunan
setiap aset yang mengalami nilai teridentifikasi/Write-off
penurunan nilai atau excess of assets’ carrying
terbengkalai/ amount over recoverable
No write-off until proposal for amount when impairment
abandonment approved by identified
PGE for any impaired or
abandoned assets
Derivatif/Derivatives Tidak dapat diterapkan/ Dicatat pada nilai wajar/
Not applicable Recognised at fair value
Overhaul/pemeliharaan besar/ Dibebankan/Expensed Dikapitalisasi/Capitalised
Overhaul/major maintenance
Sewa (sebagai penyewa)/ Dibebankan/Expensed Dicatat sesuai dengan PSAK
Leases (as lessee) 116/Accounted for in accordance
with PSAK 116
58
Page 61
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
4. ESTIMASI DAN PERTIMBANGAN AKUNTANSI 4. CRITICAL ACCOUNTING ESTIMATES AND
YANG PENTING JUDGEMENTS
Penyusunan laporan keuangan konsolidasian yang The preparation of consolidated financial statements in
sesuai dengan ISAK mengharuskan manajemen untuk conformity with ISAK requires management to make
membuat estimasi dan asumsi yang mempengaruhi estimates and assumptions that affect the reported
jumlah aset dan liabilitas yang dilaporkan dan amounts of assets and liabilities and the disclosure of
pengungkapan aset dan liabilitas kontinjensi pada contingent assets and liabilities at the reporting date and
tanggal pelaporan, serta jumlah pendapatan dan beban the reported amounts of revenue and expenses during
selama periode pelaporan. Estimasi, asumsi dan the reporting year. Estimates, assumptions and
pertimbangan tersebut dievaluasi secara terus judgements are continually evaluated and are based on
menerus dan berdasarkan pengalaman historis dan historical experience and other factors, including
faktor-faktor lainnya, termasuk harapan peristiwa di expectations of future events that are believed to be
masa datang yang diyakini wajar berdasarkan kondisi reasonable under the circumstances.
yang ada.
Grup telah mengidentifikasi hal-hal berikut dimana The Group has identified the following matters under
diperlukan pertimbangan, estimasi dan asumsi which significant judgements, estimates and assumptions
signifikan dan dimana hasil aktual dapat berbeda dari are made and where actual results may differ from these
estimasi tersebut jika menggunakan asumsi dan estimates under different assumptions and conditions
kondisi yang berbeda dan dapat mempengaruhi secara and may materially affect the consolidated financial
material hasil keuangan atau posisi keuangan results or financial position of the Group reported in future
konsolidasian Grup yang dilaporkan dalam tahun years.
mendatang.
a. Penilaian pengaturan kontrak a. Contractual arrangement assessment
Manajemen menggunakan pertimbangannya Management exercises its judgement in determining
dalam menentukan apakah perjanjian kontraktual whether the contractual arrangements with PLN fall
dengan PLN termasuk dalam ruang lingkup ISAK within the scope of ISAK 16 Service Concession
16 Perjanjian Konsesi Jasa. Berdasarkan evaluasi Arrangements. Based on management’s evaluation
manajemen atas syarat-syarat pengaturan, of the terms of the arrangements, it determined that
ditetapkan bahwa pengaturan tersebut tidak the arrangements are not within the scope of service
termasuk dalam ruang lingkup pengaturan konsesi concession arrangements on the basis that PLN
jasa dengan dasar bahwa PLN tidak does not control – through ownership, beneficial
mengendalikan – melalui kepemilikan, hak entitlement or otherwise – any significant residual
manfaat atau lainnya – kepentingan sisa yang interest in the infrastructure at the end of the term of
signifikan atas infrastruktur pada berakhirnya the arrangement.
jangka waktu perjanjian.
Selain itu, manajemen juga menggunakan Furthermore, management also exercises its
pertimbangannya dalam menentukan apakah judgement in determining whether the arrangement
perjanjian tersebut mengandung sewa dan jenis contains a lease and the type of lease. Based on
sewa. Berdasarkan evaluasi tersebut, manajemen such evaluation, management determined that the
menentukan bahwa perjanjian tersebut arrangements contain a lease as fulfilment of the
mengandung sewa karena pemenuhan perjanjian arrangements is dependent on the use of a specific
bergantung pada penggunaan aset atau aset asset or assets (the asset) and the arrangement
tertentu (aset) dan perjanjian tersebut memberikan conveys a right to use the asset.
hak untuk menggunakan aset tersebut.
59
Page 62
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Wayang Windu Wayang Windu
Manajemen mengklasifikasikan sewa yang timbul Management classifies the lease arising from the
dari perjanjian kontraktual Wayang Windu sebagai contractual arrangement of Wayang Windu as an
sewa operasi berdasarkan penilaian manajemen operating lease based on management’s evaluation
bahwa perjanjian tersebut tidak mengalihkan that the arrangement does not transfer substantially
secara substansial seluruh risiko dan manfaat all the risks and rewards incidental to ownership.
yang terkait dengan kepemilikan.
Salak dan Darajat Salak and Darajat
Manajemen mengklasifikasikan sewa yang timbul Management classifies the leases arising from the
dari perjanjian kontrak Salak dan Darajat sebagai contractual arrangements of Salak and Darajat as
sewa pembiayaan, berdasarkan penilaian finance leases, based on management’s evaluation
manajemen bahwa perjanjian tersebut that the arrangements transfer substantially all the
mengalihkan secara substansial seluruh risiko dan risks and rewards incidental to ownership.
manfaat yang terkait dengan kepemilikan.
b. Piutang sewa pembiayaan b. Finance lease receivables
Saldo piutang sewa pembiayaan SEGSPL dan The finance lease receivables balance of SEGSPL
SEGDL sama dengan pembayaran sewa minimum and SEGDL is equal to the minimum lease payments
ditambah nilai sisa yang tidak dijamin yang diakui plus any unguaranteed residual value accruing to the
oleh pesewa yang didiskontokan pada suku bunga lessor discounted at the interest rate implicit in the
implisit dalam sewa. Pembayaran sewa minimum lease. Minimum lease payments of the lease are the
dari sewa adalah pembayaran atas persyaratan payments over the JOC and ESC terms that PLN is
JOC dan ESC yang harus dilakukan oleh PLN, required to make, excluding contingent escalation in
tidak termasuk kenaikan harga yang tidak terduga prices (for example, inflation adjustments), costs for
(misalnya, penyesuaian inflasi), biaya produksi production of electricity, operation and maintenance
listrik, layanan operasi dan pemeliharaan, dan services and taxes. In essence, the minimum lease
pajak. Intinya, pembayaran sewa minimum payments represent the compensation for costs of
merupakan kompensasi atas biaya modal yang capital invested by SEGSPL and SEGDL to
diinvestasikan oleh SEGSPL dan SEGDL untuk construct and develop the power plant only. Under
membangun dan mengembangkan pembangkit the ESC, however, SEGSPL and SEGDL receive
listrik saja. Namun, di bawah ESC, SEGSPL dan one consideration for all of their services.
SEGDL menerima satu pertimbangan untuk
semua layanan mereka.
Oleh karena itu, manajemen telah menggunakan Therefore, management has used the residual value
metode nilai residu untuk mengestimasi method to estimate the split between the
pembagian antara imbalan yang diterima untuk consideration received for financing activities to
aktivitas pendanaan guna menentukan jumlah determine the amount applicable to the finance lease
yang berlaku untuk piutang sewa pembiayaan. receivables. Management estimated the net present
Manajemen mengestimasi nilai sekarang bersih value of the finance lease receivables at an amount
piutang sewa pembiayaan sebesar jumlah yang not to exceed the capital costs spent to construct and
tidak melebihi biaya modal yang dikeluarkan untuk develop the Power Plant. Judgements and estimates
membangun dan mengembangkan Pembangkit are used to estimate the split between the different
Listrik. Penilaian dan perkiraan digunakan untuk components of the consideration received from PLN;
memperkirakan pembagian antara berbagai and to estimate the constant rate of return used to
komponen imbalan yang diterima dari PLN; dan discount the minimum lease payments.
untuk memperkirakan tingkat pengembalian
konstan yang digunakan untuk mendiskontokan
pembayaran sewa minimum.
Jika asumsi awal yang digunakan untuk Where the initial assumptions used to build the
membangun piutang sewa pembiayaan berbeda finance lease receivables differ from those used by
dengan asumsi yang digunakan oleh manajemen, management, the estimated receivable balance
estimasi saldo piutang akan terpengaruh. would have been affected. As a result, the amounts
Akibatnya, jumlah yang diakui dalam laba rugi recognised in profit or loss for electricity sales
untuk pendapatan penjualan tenaga listrik yang revenue measured using the residual value
diukur dengan menggunakan pendekatan nilai approach would also have been different. Once the
residu juga akan berbeda. Setelah piutang sewa finance lease receivable is recognised at inception,
pembiayaan diakui pada awal, saldo tidak perlu the balance does not need to be subsequently re-
diukur kembali kecuali ada amendemen signifikan measured unless there are significant amendments
yang dibuat pada JOC dan ESC/PPA, di mana made to the JOC and ESC/PPA, at which time
manajemen perlu menilai kembali model sewa management needs to re-assess its finance lease
pembiayaannya. model.
60
Page 63
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Sumber ketidakpastian estimasi Sources of estimation uncertainty
Asumsi utama masa depan dan sumber estimasi utama The key assumptions concerning the future and other key
lainnya pada akhir periode pelaporan yang memiliki sources of estimation at the end of the reporting period
risiko signifikan yang menyebabkan penyesuaian that have a significant risk of causing a material
material terhadap nilai tercatat aset dan liabilitas untuk adjustment to the carrying amounts of assets and
tahun buku berikutnya dibahas di bawah ini: liabilities within the next financial year are discussed
below:
c. Estimasi cadangan c. Reserve estimates
Manajemen menentukan taksiran masa manfaat Management determines the estimated useful lives
dan biaya penyusutan yang terkait untuk sumur and related depreciation charges for the Group’s
produksi dan fasilitas sumur Grup. Pakar production wells and well facilities. The Group’s
manajemen internal Grup memutakhirkan internal management expert updates the geothermal
perkiraan cadangan uap panas bumi setiap tahun, steam reserves estimate on an annual basis, by
dengan mempertimbangkan data geologis dan considering the geological and technical data from
teknis dari setiap sumur produksi dan kondisi each production well and the overall field condition
lapangan secara keseluruhan pada tanggal as of the assessment date. The key data input in the
penilaian. Input data utama dalam perkiraan geothermal steam reserves estimate is the estimated
cadangan uap panas bumi adalah perkiraan geothermal steam production rate over the life of the
tingkat produksi uap panas bumi selama umur geothermal operations within the term of the JOC
operasi panas bumi dalam jangka waktu JOC between the subsidiaries and PGE, and the key
antara entitas anak dan PGE, dan asumsi utama assumption used is the expected natural decline
yang digunakan adalah perkiraan tingkat rate.
penurunan alami.
Karena asumsi geologis dan teknis yang Because the geological and technical assumptions
digunakan untuk memperkirakan cadangan uap used to estimate geothermal steam reserves vary
panas bumi bervariasi dari waktu ke waktu dan from period to period and because additional
karena data geologis dan teknis tambahan geological and technical data is generated during the
dihasilkan selama operasi, perkiraan cadangan course of operations, estimates of geothermal steam
uap panas bumi dapat berubah dari waktu ke reserves may change from period to period.
waktu. Perubahan estimasi cadangan uap panas Changes in estimated geothermal steam reserves
bumi yang dilaporkan dapat mempengaruhi hasil may affect the Group’s financial results and financial
keuangan dan posisi keuangan Grup dalam position in a number of ways, including the carrying
berbagai cara, termasuk nilai tercatat sumur values of the production wells and well facilities, that
produksi dan fasilitas sumur, yang mungkin may be affected due to changes in depreciation
terpengaruh karena perubahan biaya penyusutan charges that were calculated on a UoP basis.
yang dihitung berdasarkan UoP.
d. Pemulihan nilai aset panas bumi d. Recoverability of geothermal assets
Grup menilai setiap aset atau UPK (tidak termasuk The Group assesses each asset or CGU (excluding
goodwill, yang dinilai setiap tahun terlepas dari goodwill, which is assessed annually regardless of
indikatornya) setiap periode pelaporan untuk indicators) each reporting period to determine
menentukan apakah terdapat indikasi penurunan whether any indication of impairment exists. Where
nilai. Jika terdapat indikator penurunan nilai, an indicator of impairment exists, a formal estimate
estimasi formal atas jumlah terpulihkan dibuat, of the recoverable amount is made, which is
yang dianggap lebih tinggi antara nilai wajar considered to be the higher of fair value less costs of
dikurangi biaya pelepasan dan nilai pakai. disposal and value in use. These assessments
Penilaian ini membutuhkan penggunaan estimasi require the use of estimates and assumptions such
dan asumsi seperti tingkat diskonto, tingkat as discount rate, annual growth rate, future electricity
pertumbuhan tahunan, harga jual listrik di masa sales price, electricity and steam generation
mendatang, produksi listrik dan uap (termasuk (including geothermal steam reserves) and
cadangan uap panas bumi) dan estimasi belanja estimated capital and operating expenditures.
modal dan operasi.
Estimasi dan asumsi ini dipengaruhi oleh risiko dan These estimates and assumptions are subject to risk
ketidakpastian. Oleh karena itu, terdapat and uncertainty. Therefore, there is a possibility that
kemungkinan bahwa perubahan keadaan akan changes in circumstances will affect these
mempengaruhi proyeksi tersebut, yang dapat projections, which may affect the recoverable
berdampak pada jumlah terpulihkan aset dan/atau amount of assets and/or CGUs.
UPK.
61
Page 64
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Nilai wajar ditentukan sebagai jumlah yang akan Fair value is determined as the amount that would be
diperoleh dari penjualan aset dalam transaksi obtained from the sale of the asset in an arm’s length
wajar antara pihak yang berpengetahuan dan transaction between knowledgeable and willing
berkeinginan. parties.
Dalam menilai nilai pakai, estimasi arus kas masa In assessing value in use, the estimated future cash
depan didiskontokan ke nilai kininya dengan flows are discounted to their present value using a
menggunakan tingkat diskonto sebelum pajak pre-tax discount rate that reflects current market
yang mencerminkan penilaian pasar kini atas nilai assessments of the time value of money and the
waktu uang dan risiko spesifik aset. Dalam risks specific to the asset. In determining fair value
menentukan nilai wajar dikurangi biaya pelepasan, less costs of disposal, recent market transactions are
transaksi pasar terkini diperhitungkan. Jika tidak taken into account. If no such transactions can be
ada transaksi yang dapat diidentifikasi, model identified, an appropriate valuation model is used.
penilaian yang sesuai digunakan. Perhitungan ini These calculations are corroborated by valuation
dikuatkan oleh kelipatan penilaian, harga saham multiples, quoted share prices for publicly traded
yang dikutip untuk perusahaan publik atau companies or other available fair value indicators.
indikator nilai wajar lainnya yang tersedia.
e. Pemulihan nilai goodwill e. Recoverability of goodwill
Manajemen telah menilai UPK sebagai bidang Management has assessed its CGUs as being an
individual, yang merupakan tingkat terendah individual field, which is the lowest level for which
dimana arus kas masuk sebagian besar cash inflows are largely independent of those of
independen dari aset lainnya. other assets.
Grup menentukan apakah goodwill mengalami The Group determines whether goodwill is impaired
penurunan nilai setidaknya setiap tahun. Dalam on at least an annual basis. In performing the
melakukan pengujian penurunan nilai atas nilai impairment assessment of the carrying amount of
tercatat goodwill, seperti diungkapkan pada goodwill, as disclosed in Note 14, the recoverable
Catatan 14, jumlah terpulihkan UPK ditentukan amounts of the CGUs are determined using a value-
dengan menggunakan perhitungan nilai pakai in-use (“VIU”) calculation. Cash flow projections use
(“VIU”). Proyeksi arus kas menggunakan model a discounted cash flow model. In making these
arus kas yang didiskontokan. Dalam membuat estimates, management has relied on past
estimasi ini, manajemen mengandalkan kinerja performance and its expectations of market
masa lalu dan ekspektasi perkembangan pasar di developments in Indonesia. Specific estimates are
Indonesia. Estimasi spesifik diungkapkan pada disclosed in Note 14.
Catatan 14.
Estimasi dan asumsi ini tunduk pada risiko dan These estimates and assumptions are subject to risk
ketidakpastian. Oleh karena itu, terdapat and uncertainty. Therefore, there is a possibility that
kemungkinan bahwa perubahan keadaan akan changes in circumstances will impact these
mempengaruhi proyeksi tersebut, yang dapat projections, which may impact the recoverable
berdampak pada jumlah terpulihkan aset dan/atau amount of assets and/or CGUs. The change in the
UPK. Perubahan estimasi jumlah terpulihkan dari estimated recoverable amount from any reasonably
setiap kemungkinan perubahan estimasi utama possible change in the key estimates may change
yang mungkin terjadi dapat mengubah penilaian the assessment of whether an impairment charge, or
apakah diperlukan penurunan nilai, atau reversal of a previously booked impairment, is
pembalikan penurunan nilai, yang dibukukan required with the impact being recorded in profit or
sebelumnya dengan dampak yang dicatat dalam loss.
laba rugi.
f. Kerugian penurunan nilai atas piutang f. Impairment loss on receivables
Dalam menghitung ECL untuk piutang usaha dan In calculating ECL for trade receivables and other
piutang lain-lain, Grup menentukan tarif provisi receivables, the Group determines the provision
berdasarkan tunggakan hari untuk rates based on days past due for groupings of
pengelompokan berbagai segmen pelanggan yang various customer segments that have similar credit
memiliki karakteristik risiko kredit yang serupa. risk characteristics.
Grup menyesuaikan pengalaman kerugian kredit The Group adjusts the historical credit loss
historis dengan informasi berwawasan ke depan. experience with forward-looking information. For
Misalnya, jika perkiraan kondisi ekonomi instance, if forecast economic conditions are
diperkirakan akan memburuk selama tahun expected to deteriorate over the next year, which can
berikutnya, yang dapat menyebabkan peningkatan lead to an increased number of defaults, the
jumlah gagal bayar, tingkat gagal bayar historis historical default rates are adjusted. At every
disesuaikan. Pada setiap tanggal pelaporan, reporting date, the historical observed default rates
riwayat tingkat gagal bayar yang diamati diperbarui are updated and changes in the forward-looking
dan perubahan dalam perkiraan perkiraan ke estimates are analysed.
depan dianalisis.
62
Page 65
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Penilaian korelasi antara tingkat default yang The assessment of the correlation between
diamati secara historis, prakiraan kondisi ekonomi historical observed default rates, forecast
dan ECL merupakan estimasi yang signifikan. economic conditions and ECL is a significant
Besaran ECL sensitif terhadap perubahan estimate. The amount of ECL is sensitive to
keadaan dan perkiraan kondisi ekonomi. changes in circumstances and forecast economic
Pengalaman kerugian kredit historis Grup dan conditions. The Group’s historical credit loss
perkiraan kondisi ekonomi mungkin juga tidak experience and forecast of economic conditions
mencerminkan default aktual pelanggan di masa may also not be representative of customers’
mendatang. actual default in the future.
g. Provisi untuk imbalan kerja jangka panjang g. Provisions for long-term employee benefits
Nilai kini kewajiban pensiun tergantung pada The present value of the pension obligations
beberapa faktor yang ditentukan berdasarkan depends on a number of factors that are
aktuaria dengan menggunakan beberapa asumsi. determined on an actuarial basis using a number
Asumsi yang digunakan dalam menentukan biaya of assumptions. The assumptions used in
(pendapatan) bersih untuk pensiun meliputi tingkat determining the net cost (income) for pensions
diskonto, perubahan remunerasi di masa depan, include the discount rate, future remuneration
tingkat pengunduran diri karyawan, harapan hidup changes, employee attrition rates, life expectancy
dan perkiraan sisa masa kerja karyawan. Setiap and expected remaining years of service of
perubahan asumsi ini akan berdampak pada nilai employees. Any changes in these assumptions will
tercatat kewajiban pensiun. have an impact on the carrying amount of pension
obligations.
Grup menentukan tingkat diskonto yang sesuai The Group determines the appropriate discount
dan kenaikan gaji di masa depan pada setiap akhir rate and future salary increase at the end of each
periode pelaporan. Tingkat diskonto adalah tingkat reporting period. The discount rate is the interest
bunga yang harus digunakan untuk menentukan rate that should be used to determine the present
nilai sekarang dari perkiraan arus kas keluar masa value of estimated future cash outflows expected
depan yang diharapkan akan diperlukan untuk to be required to settle the pension obligations.
menyelesaikan kewajiban pensiun.
Dalam menentukan tingkat diskonto yang tepat, In determining the appropriate discount rate, the
Grup mempertimbangkan tingkat suku bunga Group considers the interest rates of Government
obligasi Pemerintah yang didenominasikan dalam bonds that are denominated in the currency in
mata uang imbalan yang akan dibayarkan dan which the benefits will be paid and that have terms
yang memiliki jangka waktu jatuh tempo yang to maturity approximating the terms of the related
mendekati jangka waktu kewajiban pensiun terkait. pension obligation.
Untuk tingkat kenaikan gaji di masa mendatang, For the rate of future salary increases, the Group
Grup mengumpulkan semua data historis yang collects all historical data relating to changes in
berkaitan dengan perubahan gaji pokok dan base salaries and adjusts it for future business
menyesuaikannya dengan rencana bisnis di masa plans.
mendatang.
Asumsi kunci lainnya untuk kewajiban pensiun Other key assumptions for pension obligations are
didasarkan pada kondisi pasar saat ini. based on current market conditions.
h. Pajak penghasilan h. Income tax
Ketidakpastian muncul sehubungan dengan Uncertainties exist with respect to the interpretation
interpretasi peraturan perpajakan yang rumit dan of complex tax regulations and the amount and
jumlah serta waktu penghasilan kena pajak di timing of future taxable income. Given the wide range
masa mendatang. Mengingat luasnya hubungan of international business relationships and the long-
bisnis internasional dan sifat jangka panjang dan term nature and complexity of existing contractual
kompleksitas perjanjian kontraktual yang ada, agreements, differences arising between the actual
perbedaan yang timbul antara hasil aktual dan results and the assumptions made, or future
asumsi yang dibuat, atau perubahan asumsi changes to such assumptions, could necessitate
tersebut di masa mendatang, dapat memerlukan future adjustments to tax provisions already
penyesuaian di masa mendatang terhadap recorded. The Group establishes provisions, based
ketentuan perpajakan yang telah dicatat. Grup on reasonable estimates, for possible consequences
menetapkan provisi, berdasarkan perkiraan yang of audits by the tax authorities of the respective
wajar, untuk kemungkinan konsekuensi audit oleh countries in which it operates.
otoritas pajak di negara tempat Grup beroperasi.
63
Page 66
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Besarnya ketentuan tersebut didasarkan pada The amount of such provisions is based on various
berbagai faktor, seperti pengalaman pemeriksaan factors, such as experience of previous tax audits
pajak sebelumnya dan perbedaan interpretasi and differing interpretations of tax regulations by the
peraturan perpajakan oleh entitas kena pajak dan taxable entity and the relevant tax authority. Such
otoritas pajak yang bersangkutan. Perbedaan differences of interpretation may arise on a wide
penafsiran tersebut dapat timbul pada berbagai variety of issues depending on the prevailing
macam persoalan tergantung pada kondisi yang conditions.
berlaku.
Pertimbangan yang signifikan diperlukan dalam Significant judgement is required in determining the
menentukan penyisihan modal dan pengurangan capital allowances and deductibility of certain
biaya tertentu selama estimasi penyisihan pajak expenses during the estimation of the provision for
penghasilan. Ada transaksi dan perhitungan income tax. There are certain transactions and
tertentu yang penentuan pajak akhirnya tidak pasti computations for which the ultimate tax
selama kegiatan usaha normal. determination is uncertain during the ordinary course
of business.
Grup mengakui liabilitas atas masalah The Group recognises liabilities for anticipated tax
pemeriksaan pajak yang diantisipasi berdasarkan audit issues based on estimates of whether
estimasi apakah tambahan pajak akan terutang. additional taxes will be due. Where the final tax
Apabila hasil pajak akhir dari hal-hal tersebut outcome of these matters is different from the
berbeda dengan jumlah yang semula dicatat, amounts that were initially recorded, such
perbedaan tersebut akan mempengaruhi differences will affect the income tax and deferred tax
ketentuan pajak penghasilan dan pajak tangguhan provisions in the period in which such determination
pada periode penetapan tersebut. Nilai tercatat is made. The carrying amounts of income tax
utang pajak penghasilan dan liabilitas pajak payable and deferred tax liabilities are disclosed in
tangguhan diungkapkan pada Catatan 25 pada Note 25 to the consolidated financial statements.
laporan keuangan konsolidasian.
Semua rugi pajak yang belum digunakan diakui All unused tax losses are recognised as deferred tax
sebagai aset pajak tangguhan sepanjang assets to the extent that it is probable that taxable
kemungkinan besar laba kena pajak akan tersedia profit will be available against which the losses can
sehingga rugi tersebut dapat dimanfaatkan. be utilised. Significant management judgement is
Pertimbangan manajemen yang signifikan required to determine the amount of deferred tax
diperlukan untuk menentukan jumlah aset pajak assets that can be recognised, based upon the likely
tangguhan yang dapat diakui, berdasarkan timing and level of future taxable profits together with
kemungkinan waktu dan tingkat laba kena pajak di future tax planning strategies.
masa depan bersamaan dengan strategi
perencanaan pajak di masa depan.
Grup beroperasi di bawah pengaturan JOC. The Group operates under the JOC arrangement.
Pertimbangan diperlukan untuk menentukan Judgement is required to determine the provision
penyisihan bagian Pemerintah dan pajak lainnya for Government share and other taxes or
atau pungutan pemerintah, termasuk Pertamina government charges, including the Pertamina
Production Allowance, dan pemulihan klaim Production Allowance, and recoverability of claims
pengembalian pajak. Apabila hasil pajak final dari for tax refunds. Where the final tax outcome of
hal-hal tersebut berbeda dengan jumlah yang these matters is different from the amounts that
awalnya dicatat, selisih tersebut akan dicatat were initially recorded, such differences will be
dalam laba rugi pada periode penentuan tersebut recorded in profit or loss in the period in which such
dibuat. a determination is made.
i. Kombinasi bisnis i. Business combination
Proses awal akuisisi entitas anak melibatkan The initial process on the acquisition of
pengidentifikasian dan penentuan nilai wajar yang subsidiaries involves identifying and determining
akan dialokasikan ke aset dan liabilitas yang dapat the fair values to be assigned to the identifiable
diidentifikasi dari entitas yang diakuisisi. Nilai wajar assets and liabilities of the acquired entities. The
atas aset yang diperoleh, termasuk aset tak fair value of the assets acquired, including the
berwujud, dan liabilitas yang diambil alih intangible assets, and liabilities assumed are
ditentukan oleh tenaga ahli valuasi eksternal. determined by external valuation experts. Any
Setiap perubahan dalam asumsi yang digunakan changes in the assumptions used and estimates
dan estimasi yang dibuat dalam menentukan nilai made in determining the fair values will impact the
wajar akan berdampak pada nilai tercatat aset dan carrying amount of these assets and liabilities.
liabilitas tersebut.
Alokasi nilai wajar atas harga pembelian The fair value allocation of the purchase price is
diungkapkan pada Catatan 6. disclosed in Note 6.
64
Page 67
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
5. RESTRUKTURISASI ANTAR ENTITAS 5. RESTRUCTURING OF ENTITIES UNDER COMMON
SEPENGENDALI CONTROL
Efektif pada tanggal 26 Desember 2022, sesuai dengan Effective on 26 December 2022, according to Notarial
Akta Notaris No. 83, 84, 85 dan 86 dari Wiwik Condro, Deeds No. 83, 84, 85 and 86 of Wiwik Condro, S.H.,
S.H., notaris di Jakarta, Rapat Umum Pemegang notary in Jakarta, the Extraordinary General Meeting of
Saham Luar Biasa Perusahaan menyetujui antara lain: the Shareholders of the Company approved the
following:
penjualan 10 lembar saham dari PT Griya Idola sale of 10 shares from PT Griya Idola to Barito
kepada Barito Pacific senilai Rp10.000.000 (nilai Pacific for IDR10,000,000 (full amount);
penuh);
peningkatan modal dasar Perusahaan menjadi increase in the Company's authorised capital to
30.000.000 lembar saham; 30,000,000 shares;
penerbitan 19.463.808 lembar saham baru issuance of 19,463,808 new shares of the
Perusahaan senilai Rp19.463.808.000.000 (nilai Company valued at IDR19,463,808,000,000 (full
penuh) (setara dengan AS$1.248.000) yang akan amount) (equivalent to US$1,248,000) to be
diambil oleh Barito Pacific sebanyak 12.975.872 subscribed for by Barito Pacific as to 12,975,872
lembar saham dan Green Era sebanyak shares and Green Era as to 6,487,936 shares
6.487.936 lembar saham dengan mekanisme under a share swap (inbreng) mechanism for all
tukar saham (inbreng) atas seluruh saham of the SEGHPL shares owned by Barito Pacific
SEGHPL milik Barito Pacific dan Green Era; and Green Era;
penerbitan saham baru Perusahaan sebesar 625 issuance of 625 new shares of the Company
lembar saham senilai Rp625.000.000 (nilai penuh) valued at IDR625,000,000 (full amount)
(setara dengan AS$40) yang akan diambil oleh (equivalent to US$40) to be subscribed for by
Green Era dan dibayarkan secara tunai; dan Green Era and paid for in cash; and
untuk merubah Anggaran Dasar Perusahaan to change the Company's Articles of Association
menjadi perusahaan Penanaman Modal Asing to become a Foreign Investment (“PMA”)
(“PMA”). company.
Sebagai akibat dari restrukturisasi SEGHPL dan entitas As a result of the restructuring of SEGHPL and its
anak (“SEGHPL Grup”) dan Perusahaan, seluruh posisi subsidiaries (“SEGHPL Group”) and the Company, all of
keuangan dan hasil operasi (termasuk saldo laba dan SEGHPL’s financial position and result of operations
cadangan lainnya) dari SEGHPL digabungkan ke (including retained earnings and other reserves) have
dalam laporan keuangan konsolidasian Perusahaan. been combined into the Company’s consolidated
Barito Pacific tetap memegang kendali atas financial statements. Barito Pacific controls both the
Perusahaan dan SEGHPL saat sebelum dan sesudah Company and SEGHPL before and after the
restrukturisasi. restructuring.
Nilai transaksi penerbitan saham baru sebesar The value of the new shares issued of US$1,248,000 was
AS$1.248.000 adalah berdasarkan laporan penilai based on an independent valuer’s report. The difference
independen. Selisih sebesar AS$497.917 antara nilai of US$497,917 between the transaction value of
transaksi sebesar AS$1.248.000 (merupakan nilai US$1,248,000 (being the value of the new shares issued)
saham baru yang diterbitkan) dan nilai modal saham and the value of SEGHPL’s share capital acquired is
SEGHPL yang diperoleh disajikan sebagai tambahan presented as additional paid-in capital in the consolidated
modal disetor dalam laporan keuangan konsolidasian financial statements of the Group.
Grup.
Perubahan terhadap Anggaran Dasar Perusahaan The changes to the Articles of Association of the
sebagai akibat dari transaksi di atas telah disetujui Company due to the transactions listed above have
oleh Menteri Hukum dan Hak Asasi Manusia been approved by the Minister of Law and Human
Republik Indonesia melalui Keputusan Rights of the Republic of Indonesia through Decree
No. AHU-0129915.AH.01.02.Tahun 2022 tanggal No. AHU-0129915.AH.01.02.Tahun 2022 dated
28 Desember 2022. 28 December 2022.
65
Page 68
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
6. AKUISISI ENTITAS ANAK DAN TRANSAKSI 6. ACQUISITION OF SUBSIDIARY AND
DENGAN PIHAK NON-PENGENDALI TRANSACTIONS WITH NON-CONTROLLING
INTERESTS
a. Akuisisi 51% kepemilikan di PT Sidrap Bayu a. Acquisition of 51% interest in PT Sidrap Bayu
Energi Tahap Dua - sebelumnya PT UPC Sidrap Energi Tahap Dua - formerly PT UPC Sidrap
Bayu Energi Tahap Dua (“SIDRAP2”) Bayu Energi Tahap Dua (“SIDRAP2”)
Pada tanggal 15 Desember 2023, BWE telah On 15 December 2023, BWE completed the
melakukan penyelesaian pengambilalihan 10.200 acquisition of 10,200 shares representing
saham yang mewakili sekitar 51% dari jumlah approximately 51% of the total issued and paid-up
modal ditempatkan dan disetor SIDRAP 2 yang capital of SIDRAP 2 from UPC Renewables Asia V
dimiliki oleh UPC Renewables Asia V Limited Limited ("UPCRAV") and UPC Sidrap Expansion
("UPCRAV") dan UPC Sidrap Expansion (HK) Ltd. (HK) Ltd. ("UPCSE"), as the sellers, for a
("UPCSE"), selaku para penjual, dengan imbalan consideration paid of US$1,346 and the novation
yang dibayarkan sebesar AS$1.346 serta of a portion of the receivables in relation to the
penerimaan novasi sebagian piutang atas development loan participation for SIDRAP 2 in the
development loan participation untuk SIDRAP 2 amount of US$19 from PT UPC Renewables
sejumlah AS$19 dari PT UPC Renewables Indonesia ("UPCRI") and US$3,805 from UPC
Indonesia ("UPCRI") dan AS$3.805 dari UPC Renewables Limited ("UPCRL").
Renewables Limited ("UPCRL").
Transaksi akuisisi saham ini dicatat sebagai This share acquisition transaction has been
akuisisi aset dan bukan sebagai kombinasi bisnis accounted for as an asset acquisition rather than a
karena tidak ada input, proses dan output yang business combination as there is no input, process
melekat pada aset tersebut yang memenuhi and output attached to the assets that would meet
definisi bisnis berdasarkan PSAK. the definition of a business under PSAK.
Pada tanggal 17 Januari 2024, BWE On 17 January 2024, BWE paid pre-completion
membayarkan kewajiban sebelum penyelesaiaan liabilities amounting to US$2,694.
sebesar AS$2.694.
Rincian aset dan liabilitas teridentifikasi yang The details of the identifiable assets and liabilities
diperoleh adalah sebagai berikut: acquired are as follows:
15 Desember/
December 15, 2023
Kas 2 Cash
Biaya pengembangan proyek 14,951 Project development costs
Aset tetap 100 Property, plant and equipment
Aset lancar lain-lain 3 Other current assets
Aset tidak lancar lain-lain 345 Other non-current assets
Utang usaha (35) Trade payables
Utang lain-lain (12,474) Other payables
Beban yang masih harus dibayar (97) Accrued expenses
Utang pajak lain-lain (156) Other taxes payable
Nilai wajar aset bersih teridentifikasi Fair value of the identifiable net
yang diperoleh 2,639 assets acquired
Kepentingan nonpengendali (49%) (1,293) Non-controlling interest (49%)
Imbalan kas yang dibayar 1,346 Cash consideration paid
Rekonsiliasi kas yang dibayarkan dan diterima ke The reconciliation of cash paid and received to the
laporan arus kas adalah sebagai berikut: statement of cash flows is as follows:
15 Desember/
December 15, 2023
Imbalan kas yang dibayar (1,346) Cash consideration paid
Pembayaran novasi pinjaman (3,824) Novation of loans paid
Dikurangi: saldo kas yang diperoleh 2 Less: balance of cash acquired
Arus kas keluar – aktivitas investasi (5,168) Cash outflow – investing activities
66
Page 69
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
b. Akuisisi 51% kepemilikan di PT Lombok Timur b. Acquisition of 51% interest in PT Lombok
Bayu Energi - sebelumnya PT UPC Lombok Timur Bayu Energi - formerly PT UPC Lombok
Timur Bayu Energi) ("LOMBOK") Timur Bayu Energi) ("LOMBOK")
Pada tanggal 3 Januari 2024, BWE telah On 3 January 2024, BWE completed the
melakukan penyelesaian pengambilalihan 10.200 acquisition of 10,200 shares representing
saham yang mewakili sekitar 51% dari jumlah approximately 51% of the total issued and paid-up
modal ditempatkan dan disetor LOMBOK yang capital of LOMBOK from UPC Renewables Asia
dimiliki oleh UPC Renewables Asia VIII Limited VIII Limited and UPC Lombok (HK) Ltd., as the
dan UPC Lombok (HK) Ltd., selaku para penjual, sellers, for a consideration paid of US$3,122 and
dengan imbalan yang dibayarkan sebesar the novation of a portion of the receivables in
AS$3.122 serta penerimaan novasi Sebagian relation to the development loan participation for
piutang atas development loan participation untuk LOMBOK in the amount of US$81 from PT UPC
LOMBOK sejumlah AS$81 dari PT UPC Renewables Indonesia ("UPCRI") and US$171
Renewables Indonesia ("UPCRI") dan AS$171 from UPC Renewables Limited (“UPCRL”).
dari UPC Renewables Limited ("UPCRL").
Transaksi akuisisi saham ini dicatat sebagai This share acquisition transaction has been
akuisisi aset dan bukan sebagai kombinasi bisnis accounted for as an asset acquisition rather than a
karena tidak ada input, proses dan output yang business combination as there is no input, process
melekat pada aset tersebut yang memenuhi and output attached to the assets that would meet
definisi bisnis berdasarkan PSAK. the definition of a business under PSAK.
Pada tanggal 17 Januari 2024, BWE On 17 January 2024, BWE paid pre-completion
membayarkan kewajiban sebelum penyelesaiaan liabilities amounting to US$587.
sebesar AS$587.
Rincian aset dan liabilitas teridentifikasi yang The details of the identifiable assets and liabilities
diperoleh adalah sebagai berikut: acquired are as follows:
3 Januari/
January 3, 2024
Kas 1 Cash
Piutang usaha dan lain-lain – lancar 44 Trade and other receivables – current
Aset lancar lain-lain 2 Other current assets
Aset tetap 37 Property, plant and equipment
Biaya pengembangan proyek 7,700 Project development costs
Beban yang masih harus dibayar (962) Accrued expenses
Utang pajak (52) Taxes payable
Utang usaha dan lain-lain – lancar (156) Trade and other payables – current
Utang usaha dan lain-lain – tidak lancar (492) Trade and other payables – non current
Total aset bersih teridentifikasi
yang diperoleh 6,122 Total identifiable net assets acquired
Kepentingan nonpengendali (49%) (3,000) Non-controlling interest (49%)
Imbalan kas yang dibayar 3,122 Cash consideration paid
Rekonsiliasi kas yang dibayarkan dan diterima ke The reconciliation of cash paid and received to the
laporan arus kas adalah sebagai berikut: statement of cash flows is as follows:
3 Januari/
January 3, 2024
Imbalan kas yang dibayar (3,122) Cash consideration paid
Pembayaran novasi pinjaman (252) Novation of loans paid
Dikurangi: saldo kas yang diperoleh 1 Less: balance of cash acquired
Arus kas keluar – aktivitas investasi (3,373) Cash outflow – investing activities
67
Page 70
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
c. Akuisisi 51% kepemilikan di PT Sukabumi Bayu c. Acquisition of 51% interest in PT Sukabumi
Energi - sebelumnya PT UPC Sukabumi Bayu Bayu Energi - formerly PT UPC Sukabumi Bayu
Energi) ("SUKABUMI") Energi) ("SUKABUMI")
Pada tanggal 3 Januari 2024, BWE telah On 3 January 2024, BWE completed the
melakukan penyelesaian pengambilalihan 19.364 acquisition of 19,364 shares representing
saham yang mewakili sekitar 51% dari jumlah approximately 51% of the total issued and paid-up
modal ditempatkan dan disetor SUKABUMI yang capital of SUKABUMI from UPC Renewables Asia
dimiliki oleh UPC Renewables Asia IV Limited dan IV Limited and UPC Sukabumi (HK) Ltd., as the
UPC Sukabumi (HK) Ltd., selaku para penjual, sellers, for a consideration paid of US$1,560 and
dengan imbalan yang dibayarkan sebesar the novation of a portion of the receivables in
AS$1.560 serta penerimaan novasi sebagian relation to the development loan participation for
piutang atas development loan participation untuk SUKABUMI in the amount of US$312 from PT UPC
SUKABUMI sejumlah AS$312 dari PT UPC Renewables Indonesia ("UPCRI") and US$2,184
Renewables Indonesia (“UPCRI”) dan AS$2.184 from UPC Renewables Limited ("UPCRL").
dari UPC Renewables Limited ("UPCRL").
Transaksi akuisisi saham ini dicatat sebagai This share acquisition transaction has been
akuisisi aset dan bukan sebagai kombinasi bisnis accounted for as an asset acquisition rather than a
karena tidak ada input, proses dan output yang business combination as there is no input, process
melekat pada aset tersebut yang memenuhi and output attached to the assets that would meet
definisi bisnis berdasarkan PSAK. the definition of a business under PSAK.
Pada tanggal 17 Januari 2024, BWE On 17 January 2024, BWE paid pre-completion
membayarkan kewajiban sebelum penyelesaiaan liabilities amounting to US$1,875.
sebesar AS$1.875.
Rincian aset dan liabilitas teridentifikasi yang The details of the identifiable assets and liabilities
diperoleh adalah sebagai berikut: acquired are as follows:
3 Januari/
January 3, 2024
Kas 1 Cash
Piutang usaha dan lain-lain – lancar 634 Trade and other receivables – current
Persediaan 21 Inventories
Biaya pengembangan proyek 10.967 Project development costs
Aset tetap 46 Property, plant and equipment
Aset lancar lain-lain 15 Other current assets
Utang usaha dan lain-lain – lancar (508) Trade and other payables – current
Utang usaha dan lain-lain – tidak lancar (4.901) Trade and other payables – non current
Beban yang masih harus dibayar (3.022) Accrued expenses
Utang pajak (194) Taxes payable
Total aset bersih teridentifikasi
yang diperoleh 3.059 Total identifiable net assets acquired
Kepentingan nonpengendali (49%) (1.499) Non-controlling interest (49%)
Imbalan kas yang dibayar 1.560 Cash consideration paid
Rekonsiliasi kas yang dibayarkan dan diterima ke The reconciliation of cash paid and received to the
laporan arus kas adalah sebagai berikut: statement of cash flows is as follows:
3 Januari/
January 3, 2024
Imbalan kas yang dibayar (1.560) Cash consideration paid
Pembayaran novasi pinjaman (2.496) Novation of loans paid
Dikurangi: saldo kas yang diperoleh 1 Less: balance of cash acquired
Arus kas keluar – aktivitas investasi (4.055) Cash outflow – investing activities
68
Page 71
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
d. Akuisisi 99.99% kepemilikan di PT UPC Sidrap d. Acquisition of 99.99% interest in PT UPC Sidrap
Bayu Energi (“SBE”) Bayu Energi (“SBE”)
SBE saat ini mengoperasikan pembangkit listrik SBE currently operates a 75 MW wind-powered
tenaga angin 75 megawatts (“MW”) berdasarkan electricity plant under a Power Purchase
Power Purchase Agreement (“PPA”) dengan Agreement (“PPA”) with PT Perusahaan Listrik
PT Perusahaan Listrik Negara (Persero) (“PLN”) Negara (Persero) (“PLN”) for a period of 30 years
untuk periode selama 30 tahun dari tanggal 5 April from 5 April 2018.
2018.
Pada tanggal 2 April 2024, BWE telah melakukan On 2 April 2024, BWE completed the acquisition of
penyelesaian pengambilalihan 515.515 saham A 515.515 of class A shares and 34,368 of class B
dan 34.368 saham B yang mewakili sekitar 99.99% shares representing approximately 99.99% of the
dari jumlah modal ditempatkan dan disetor SBE total issued and paid-up capital of SBE from UPC
yang dimiliki oleh UPC Renewables Asia Holdings Renewables Asia Holdings Pte. Ltd., ACEN
Pte. Ltd., ACEN Renewables International Pte. Renewables International Pte. Ltd., UPC
Ltd., UPC Renewabales Asia III Limited, Sidrap Renewabales Asia III Limited, Sidrap (HK) Limited,
(HK) Limited, dan Sunedison Sidrap B.V., selaku dan Sunedison Sidrap B.V., as the sellers, for a
para penjual, dengan imbalan yang dibayarkan consideration paid of US$101,927. Subsequently,
sebesar AS$101.927. Setelahnya, sesuai dengan in accordance with the Sales Purchase
Sales Purchase Agreement, Perusahaan Agreement, the company engaged an external
menunjuk pihak luar untuk melakukan verifikasi party to perform verification of the consideration
atas pembayaran dan menyimpulkan bahwa paid and has concluded that an additional payment
diperlukan tambahan pembayaran sebesar of US$6,351 is required.
AS$6,351.
Transaksi akuisisi saham ini dicatat sebagai This share acquisition transaction has been
sebagai kombinasi bisnis sesuai definisi bisnis accounted for a business combination which meet
berdasarkan PSAK. the definition of a business under PSAK.
Perusahaan mengakui kontrak pelanggan, The Company recognised customer contract,
liabilitas pajak tangguhan dan goodwill masing - deferred tax liabilities and goodwill amounting to
masing sebesar AS$78.709, AS$20.941 dan US$78,709, US$20,941 and US$12,051
AS$12.051 pada saat pengalihan dilakukan. respectively at the time the transfer took place.
Nilai wajar atas aset dan liabilitas teridentifikasi The fair values of the identifiable assets and
SBE pada tanggal akuisisi adalah sebagai berikut: liabilities of SBE as at the date of acquisition were:
2 April/
April 2, 2024
Kas 65 Cash
Rekening bank yang dibatasi penggunaannya 14,849 Restricted cash in banks
Piutang usaha dan lain-lain 2,308 Trade and other receivables
Persediaan 231 Inventories
Pajak dibayar di muka 1,497 Prepaid taxes
Aset lancar lain-lain 437 Other current assets
Aset tetap 108,523 Property, plant and equipment
Aset keuangan derivatif 10,776 Derivative financial assets
Aset tidak berwujud 26 Intangible assets
Aset tidak lancar lain-lain 209 Other non current assets
Utang usaha dan lain-lain (195) Trade and other payables
Beban yang masih harus dibayar (8,988) Accrued expenses
Liabilitas pajak tangguhan (3,514) Deferred tax liabilities
Utang pajak (1,465) Taxes payable
Pinjaman (86,224) Borrowing
Liabilitas imbalan kerja (76) Employment benefits obligation
Nilai wajar aset bersih teridentifikasi Fair value of the identifiable net
yang diperoleh 38,459 assets acquired
Kontrak pelanggan 78,709 Customer contract
Liabilitas pajak tangguhan (20,941) Deferred tax liabilities
Goodwill 12,051 Goodwill
Total imbalan 108,278 Total consideration
Dikurangi: saldo kas yang diperoleh (14,914) Less: balance of cash acquired
Arus kas keluar – aktivitas investasi 93,364 Cash outflow – investing activities
69
Page 72
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
e. Akuisisi 99.96% kepemilikan di PT Barito Wind e. Acquisition of 99.96% interest in PT Barito
Operation and Maintenance Indonesia - Wind Operation and Maintenance Indonesia -
sebelumnya PT UPC Operation and formerly PT UPC Operation and Maintenance
Maintenance Indonesia) ("OMI") Indonesia) ("OMI")
Pada tanggal 2 April 2024, BWE telah melakukan On 2 April 2024, BWE completed the acquisition of
penyelesaian pengambilalihan 2.499 saham yang 2,499 shares representing approximately 99.96%
mewakili sekitar 99.96% dari jumlah modal of the total issued and paid-up capital of OMI from
ditempatkan dan disetor OMI yang dimiliki oleh UPC Renewables Asia Holdings Pte. Ltd., as the
UPC Renewables Asia Holdings Pte. Ltd., selaku sellers, for a consideration paid of US$292.
para penjual, dengan imbalan yang dibayarkan
sebesar AS$292.
Transaksi akuisisi saham ini dicatat sebagai This share acquisition transaction has been
sebagai kombinasi bisnis sesuai definisi bisnis accounted for a business combination which meet
berdasarkan PSAK. the definition of a business under PSAK.
Perusahaan mengakui biaya goodwill sebesar The Company recognised goodwill amounting to
AS$162 pada saat pengalihan dilakukan. US$162 at the time the transfer took place.
Nilai wajar atas aset dan liabilitas teridentifikasi The fair values of the identifiable assets and
OMI pada tanggal akuisisi adalah sebagai berikut: liabilities of OMI as at the date of acquisition were:
2 April/
April 2, 2024
Kas 81 Cash
Piutang usaha dan lain-lain 61 Trade and other receivables
Aset lancar lain-lain 19 Other current assets
Aset tetap 11 Property, plant and equipment
Utang usaha dan lain-lain (9) Trade and other payables
Beban yang masih harus dibayar (3) Accrued expenses
Utang pajak (12) Taxes payable
Liabilitas imbalan kerja (18) Employment benefits obligation
Nilai wajar aset bersih teridentifikasi Fair value of the identifiable net
yang diperoleh 130 assets acquired
Kepentingan nonpengendali (0,04%) 0 Non-controlling interest (0.04%)
Goodwill 162 Goodwill
Imbalan kas yang dibayar 292 Cash consideration paid
Dikurangi: saldo kas yang diperoleh (81) Less: balance of cash acquired
Arus kas keluar – aktivitas investasi 211 Cash outflow – investing activities
70
Page 73
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
7. KAS DAN SETARA KAS 7. CASH AND CASH EQUIVALENTS
30 Juni/ 31 Desember/
June December
2025 2024
Kas 94 94 Cash on hand
Kas di bank – pihak ketiga: Cash in banks – third parties:
Rupiah Rupiah
PT Bank Central Asia Tbk 1,726 2,005 PT Bank Central Asia Tbk
PT Bank Negara Indonesia PT Bank Negara Indonesia
(Persero) Tbk 1,196 826 (Persero) Tbk
PT Bank DBS Indonesia 818 2,855 PT Bank DBS Indonesia
PT Bank Mandiri (Persero) Tbk 604 4,019 PT Bank Mandiri (Persero) Tbk
PT Bank CIMB Niaga Tbk 380 128 PT Bank CIMB Niaga Tbk
PT Bank Rakyat Indonesia PT Bank Rakyat Indonesia
(Persero) Tbk 7 - (Persero) Tbk
Dolar AS US Dollars
Bank DBS Ltd. (Singapura) 237,178 127,218 Bank DBS Ltd. (Singapura)
PT Bank Mandiri (Persero) Tbk 5,652 3,491 PT Bank Mandiri (Persero) Tbk
PT Bank DBS Indonesia 3,606 4,384 PT Bank DBS Indonesia
PT Bank CIMB Niaga Tbk 3,002 2,984 PT Bank CIMB Niaga Tbk
PT Bank Negara Indonesia PT Bank Negara Indonesia
(Persero) Tbk 1,638 13,989 (Persero) Tbk
PT Bank Central Asia Tbk 721 686 PT Bank Central Asia Tbk
Mata uang asing lainnya 149 45 Other foreign currencies
Deposito berjangka: Time deposit:
Dolar AS US Dollars
PT Bank Negara Indonesia PT Bank Negara Indonesia
(Persero) Tbk 8,650 - (Persero) Tbk
Jumlah 265,421 162,724 Total
Tidak ada kas dan setara kas yang dimiliki oleh pihak There is no cash and cash equivalents held with related
berelasi. Tidak ada kas dan setara kas yang parties. There is no cash and cash equivalents pledged as
dijaminkan. collateral.
Tingkat suku bunga tahunan atas kas di bank selama Annual interest rates on cash in banks over the years are
tahun berjalan adalah sebagai berikut: as follows:
30 Juni/ 31 Desember/
June December
2025 2024
Rupiah 0.00% - 5.50% 0.00% - 5.50% Rupiah
Dolar AS 0.00% - 5.25% 0.00% - 5.25% US Dollars
Tingkat suku bunga tahunan atas deposito berjangka Annual interest rates on restricted time deposit over the
yang dibatasi penggunaannya selama tahun berjalan years are as follows:
adalah sebagai berikut:
30 Juni/ 31 Desember/
June December
2025 2024
Dolar AS 5.00% - US Dollars
71
Page 74
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
8. KAS DAN DEPOSITO BERJANGKA YANG 8. RESTRICTED CASH AND TIME DEPOSITS
DIBATASI PENGGUNAANNYA
30 Juni/ 31 Desember/
June December
2025 2024
Kas di bank – pihak ketiga: Cash in banks – third parties:
Rupiah Rupiah
PT Bank Negara Indonesia PT Bank Negara Indonesia
(Persero) Tbk 3,384 3,382 (Persero) Tbk
Sumitomo Mitsui Banking Corporation Sumitomo Mitsui Banking Corporation
(“SMBC”) 822 1,741 (“SMBC”)
PT Bank Rakyat Indonesia PT Bank Rakyat Indonesia
(Persero) Tbk 12 11 (Persero) Tbk
PT Bank Central Asia Tbk - 482 PT Bank Central Asia Tbk
Dolar AS US Dollars
Bank DBS Ltd. (Singapura) 80,253 204,175 DBS Bank Ltd. (Singapore)
Bangkok Bank Public Company Ltd. 12,242 23,949 Bangkok Bank Public Company Ltd.
Sumitomo Mitsui Banking Corporation Sumitomo Mitsui Banking Corporation
(“SMBC”) 12,096 18,823 (“SMBC”)
PT Bank Negara Indonesia PT Bank Negara Indonesia
(Persero) Tbk 4,000 2,274 (Persero) Tbk
Deposito Berjangka: Time deposit:
Rupiah Rupiah
PT Bank DBS Indonesia 47,941 48,152 PT Bank DBS Indonesia
PT Bank Rakyat Indonesia PT Bank Rakyat Indonesia
(Persero) Tbk 1,540 - (Persero) Tbk
Dolar AS US Dollars
PT Bank DBS Indonesia 39,000 39,000 PT Bank DBS Indonesia
PT Bank Negara Indonesia PT Bank Negara Indonesia
(Persero) Tbk 5,000 - (Persero) Tbk
Jumlah 206,290 341,989 Total
Pada tanggal 30 Juni 2025 dan 31 Desember 2024, kas As of 30 June 2025 and 31 December 2024, restricted
dan deposito berjangka yang dibatasi penggunaannya cash and time deposit represents mandatory reserve
merupakan akun cadangan wajib untuk senior secured accounts for the senior secured notes and time deposit
notes dan deposito berjangka sebagai jaminan untuk as a guarantee for bank loan arrangement (Note 16).
utang bank (Catatan 16).
Tidak ada kas atau deposito berjangka yang dibatasi There is no restricted cash or time deposit held with
penggunaannya yang ditempatkan di pihak berelasi. related parties.
Tingkat suku bunga tahunan atas kas yang dibatasi Annual interest rates on restricted cash over the years
penggunaannya selama tahun berjalan adalah sebagai are as follows:
berikut:
30 Juni/ 31 Desember/
June December
2025 2024
Dolar AS 0.05% - 3.10% 0.05% - 3.10% US Dollars
Deposito berjangka yang dimiliki Grup memiliki jatuh Time deposit owned by the Group have maturity dates
tempo kurang dari satu tahun sejak penempatannya. less than one year since the placement.
Tingkat suku bunga tahunan atas deposito berjangka Annual interest rates on restricted time deposit over the
yang dibatasi penggunaannya selama tahun berjalan years are as follows:
adalah sebagai berikut:
72
Page 75
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
30 Juni/ 31 Desember/
June December
2025 2024
Rupiah 3.00% - 6.60% 3.00% US Dollars
Dolar AS 3.00% - 5.00% 3.00% US Dollars
9. PIUTANG USAHA DAN LAIN-LAIN 9. TRADE AND OTHER RECEIVABLES
30 Juni/ 31 Desember/
June December
2025 2024
Bagian lancar Current portion
Pihak ketiga Third parties
Piutang usaha 105,919 106,352 Trade receivables
Piutang lain-lain: Other receivables:
Bonus produksi 2,671 1,773 Production bonus
Lainnya 3,929 4,504 Others
Subjumlah 112,519 112,629 Subtotal
Dikurangkan: Less:
Cadangan kerugian kredit (6) - Credit loss allowance
Jumlah 112,513 112,629 Total
Bagian tidak lancar Non-current portion
Pihak ketiga Third parties
Piutang usaha - 415 Trade receivables
Piutang lain-lain: Other receivables:
Pihak ketiga 10,257 9,090 Third parties
Pembayaran di muka terkait Prepayment related to
dengan klaim audit government audit claims
pemerintah (Catatan 31.a) 12,820 13,741 (Note 31.a)
Piutang PPN 67,265 60,002 VAT receivables
Subjumlah 90,342 83,248 Subtotal
Dikurangkan: Less:
Cadangan kerugian kredit (14,311) (14,357) Credit loss allowances
Jumlah pihak ketiga 76,031 68,891 Total third parties
Jumlah piutang usaha dan Total trade and other
piutang lain-lain, bagian receivables, current and
lancar dan tidak lancar 188,544 181,520 non-current portion
Berdasarkan mata uang: By currency:
Dolar AS 149,141 119,335 US Dollars
Rupiah 39,403 62,185 Rupiah
Jumlah piutang usaha dan Total trade and other
piutang lain-lain, bagian receivables, current and
lancar dan tidak lancar 188,544 181,520 non-current portion
Piutang usaha Trade receivables
Seluruh piutang usaha berasal dari PLN. Piutang usaha All trade receivables are from PLN. Trade receivables
tidak dikenakan bunga dan umumnya dibayar dengan are non-interest bearing and are generally paid on 30–
jangka waktu 30–45 hari. Mereka diakui sebesar jumlah 45 day terms. They are recognised at their original
faktur aslinya, yang mewakili nilai wajarnya pada invoice amounts, which represent their fair value on
pengakuan awal. initial recognition.
73
Page 76
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
30 Juni/ 31 Desember/
June December
2025 2024
Berdasarkan umur piutang By aging of receivable
Belum jatuh tempo 104,852 103,988 Not yet due
Sudah jatuh tempo: Past due:
1 - 30 hari - - 1 - 30 days
31 - 60 hari - - 31 - 60 days
61 - 90 hari - - 61 - 90 days
> 90 hari 1,067 2,779 > 90 days
Jumlah piutang usaha, bagian Total trade receivables, current
lancar dan tidak lancar 105,919 106,767 and non-current portion
Piutang lain-lain (lancar) Other receivables (current)
Piutang lain-lain (lancar) dari pihak ketiga terutama Other receivables (current) from third parties mainly
berkaitan dengan bonus produksi tahunan yang pertain to annual production bonus paid to local
dibayarkan kepada pemerintah daerah dan akan government which will be reimbursed by the Directorate
diganti oleh Direktorat Jenderal Anggaran (“DJA”) General of Budget (“DGB”) in accordance with MoEMR
sesuai dengan Peraturan ESDM No. 23/2017. Regulation No. 23/2017.
Piutang lain-lain (tidak lancar) Other receivables (non-current)
Piutang non-usaha dari pihak ketiga tidak dikenakan Non-trade receivables from third parties are non-
bunga dan harus diselesaikan secara tunai. interest bearing and are to be settled in cash.
Pembayaran tidak diharapkan dalam waktu 12 bulan Repayments are not expected within 12 months from
sejak akhir periode pelaporan. the end of the reporting period.
Piutang PPN VAT receivables
Piutang PPN merupakan jumlah yang akan diganti oleh VAT receivables represent amounts that will be
Pemerintah Indonesia setelah Grup memulai reimbursed by the GOI after the Group has commenced
pembayaran bagian Pemerintah, yang didefinisikan payment of the Government share, which is defined in
dalam peraturan pajak panas bumi sebagai 34% dari the geothermal tax regulation as 34% of net operating
pendapatan usaha bersih. Bagian Pemerintah akan income. The Government share will be payable after
terutang setelah akumulasi rugi pajak telah digunakan the tax loss carry forward has either been utilised or
atau kadaluarsa. Berdasarkan Surat Keputusan expired. Based on the Decision Letter of MoF No.
Menteri Keuangan No. 766/KMK-04/1992 (“KMK 766”) 766/KMK-04/1992 (“KMK 766”) and subsequently
dan kemudian diubah dengan No. 209/KMK.04/1998, amended by No. 209/KMK.04/1998, the Group can
Grup dapat meminta restitusi PPN sampai dengan request VAT refund up to the amount paid for the
jumlah yang dibayarkan untuk bagian Pemerintah. Government share.
Termasuk di dalam piutang PPN adalah piutang PPN Included within VAT receivables is deferred VAT
tangguhan yang merupakan piutang PPN tangguhan receivables which represents the unpaid deferred VAT
yang belum dibayar dari kantor pajak sehubungan receivable from the tax office in relation to the tax
dengan surat ketetapan pajak yang dikeluarkan oleh assessment letter issued by the foreign companies and
kantor pajak badan dan orang asing (“BADORA”) pada individuals (“BADORA”) tax office in year 2000
tahun 2000 (Catatan 31.a). (Note 31.a).
Selama tahun 2025, Grup menerima restitusi PPN dari During 2025, the Group received reimbursement of
Pemerintah Indonesia sebesar AS$nihil (2024: VAT from the GOI amounting to US$nil (2024:
AS$294). US$294).
Mutasi cadangan kerugian kredit atas piutang usaha The movements in the allowance for credit losses on
dan piutang lain-lain adalah sebagai berikut: trade and other receivables are as follows:
74
Page 77
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
30 Juni/ 31 Desember/
June December
2025 2024
Saldo awal tahun 14,357 14,512 At the beginning of the year
Penambahan/(pengurangan): Addition/(deduction):
Klaim audit pemerintah Government audit claims
2013 – 2014 (Catatan 31.a) - - 2013 – 2014 (Note 31.a)
Sengketa penjualan uap ke Dispute on steam sales to
PT PLN Indonesia Power PT PLN Indonesia Power
(“PT PIP”) (Catatan 31.c) (29) (53) (“PT PIP”) (Note 31.c)
Perbedaan translasi mata uang (11) (102) Currency translation difference
Saldo akhir tahun 14,317 14,357 At the end of the year
Penambahan cadangan kerugian kredit terkait klaim Additions in the allowance for credit losses from the
audit pemerintah disajikan oleh Grup sebagai bagian government audit claims was presented by the Group
dari “beban pajak penghasilan” dalam laporan laba rugi as part of “income tax expense” in the consolidated
konsolidasian. Sedangkan mutasi cadangan terkait statements of profit or loss. Whilst the movement in the
PT PIP disajikan sebagai bagian dari “Lain-lain, bersih” allowance related to PT PIP was presented as part of
dalam laporan laba rugi konsolidasian. “Others, net” in the consolidated statements of profit or
loss.
Saldo pihak berelasi Related party balances
Piutang lain-lain jangka panjang dari pihak berelasi Non-current other receivables from related parties are
tidak dijamin, tidak dikenakan bunga, tidak memiliki unsecured, non-interest bearing, have no specific
jangka waktu pembayaran tertentu dan harus repayment terms and are to be settled in cash.
diselesaikan secara tunai. Pembayaran tidak Repayments are not expected within the 12 months
diharapkan dalam 12 bulan sejak akhir periode from the end of the reporting period.
pelaporan.
Manajemen berkeyakinan bahwa cadangan kerugian Management believes the established allowance for
kredit yang dibentuk cukup untuk menutupi penurunan credit losses is adequate to cover the impairment of
nilai dari piutang usaha dan piutang lain-lain. trade and other receivables.
10. PIUTANG SEWA PEMBIAYAAN 10. FINANCE LEASE RECEIVABLES
Tabel berikut menyajikan analisa jatuh tempo piutang The following table presents the maturity analysis of
sewa pembiayaan, yang menunjukkan pembayaran finance lease receivables, which shows the
sewa tidak didiskontokan yang akan diterima pada undiscounted finance lease payments to be received in
tahun pelaporan: the reporting years:
30 Juni/ 31 Desember/
June December
2025 2024
Pihak ketiga Third parties
Jumlah piutang sewa pembiayaan Total finance lease receivable
Tidak lebih dari satu tahun 54,274 48,552 Not later than one year
Lebih dari satu tahun namun Later than one year but not
tidak lebih dari lima tahun 216,655 194,210 later than five years
Lebih dari lima tahun 564,492 529,852 Later than five years
Jumlah piutang sewa pembiayaan Total undiscounted finance
yang tidak didiskontokan 835,421 772,614 lease receivables
Dikurangi: penghasilan keuangan
yang ditangguhkan (433,504) (409,165) Less: unearned finance income
Nilai kini piutang sewa pembiayaan 401,917 363,449 Present value of finance lease receivables
Dikurangi: bagian jatuh tempo
dalam satu tahun (11,822) (9,883) Less: current portion
Bagian jangka panjang 390,095 353,566 Non-current portion
75
Page 78
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Pada tanggal 30 Juni 2025 dan 31 Desember 2024, As of 30 June 2025 and 31 December 2024, the
piutang sewa pembiayaan diakui berdasarkan finance lease receivables were recognised based on
persyaratan JOC dan ESC Salak dan Darajat, yang the terms of the Salak and Darajat JOC and ESC,
termasuk dalam ruang lingkup PSAK 116 “Sewa”. which fall within the scope of PSAK 116 “Leases”. The
Kontrak tersebut memberikan hak eksklusif untuk contracts convey an exclusive right to use the power
menggunakan pembangkit listrik yang dibangun, plants which are built, owned and operated by the
dimiliki dan dioperasikan oleh Grup sampai dengan Group until the end of the contract maturity date.
berakhirnya tanggal jatuh tempo kontrak. Piutang sewa These finance lease receivables are related to Salak
pembiayaan ini terkait dengan Salak unit 4–6 dan units 4–6 and Darajat units 2–3.
Darajat unit 2–3.
Pada akhir periode pelaporan, Grup diharuskan untuk At the end of the reporting period, the Group is
menilai pencadangan atas kerugian kredit ekspektasian required to assess an allowance for expected credit
(“ECL”) untuk semua piutang. Grup telah menilai dan losses (“ECL”) for all receivables. The Group has
menentukan bahwa jumlah ECL untuk piutang sewa assessed and determined that the ECL amount for
pembiayaan tidak material pada tanggal finance lease receivables is immaterial as of
30 Juni 2025 dan 31 Desember 2024. 30 June 2025 and 31 December 2024.
Realisasi atas pendapatan keuangan yang belum Realisation of unearned finance income for the year
diterima untuk tahun yang berakhir pada tanggal ended 30 June 2025 amounted to US$20,790 (31
30 Juni 2025 adalah sebesar AS$20.790 December 2024: US$39,633) which was recognised
(31 Desember 2024: AS$39.633) yang diakui sebagai as finance lease income in profit or loss (Note 22).
pendapatan sewa pembiayaan pada laba rugi (Catatan
22).
11. PERSEDIAAN DAN BARANG MODAL DAN 11. INVENTORIES AND CAPITAL SPARES AND
PERALATAN EQUIPMENT
30 Juni/ 31 Desember/
June December
2025 2024
Persediaan: Inventories:
Suku cadang 18,953 24,757 Spare parts
Pipa 277 364 Pipes
Pelumas dan bahan kimia 188 75 Lubricants and chemicals
Sub-jumlah 19,418 25,196 Sub-total
Dikurangi: provisi atas persediaan Less: provision for slow-moving and
tidak bergerak dan usang (1,895) (1,895) obsolete inventories
Jumlah 17,523 23,301 Total
Barang modal dan peralatan: Capital spares and equipment:
Material pemboran 20,772 15,531 Drilling materials
Rotor 4,936 - Rotor
Bilah 2,879 - Blade
Suku cadang 6,413 5,960 Spare parts
Pipa 1,866 1,245 Pipes
Jumlah 36,866 22,736 Total
Laporan laba rugi konsolidasian: Consolidated statements of profit or loss:
Biaya perolehan persediaan Cost of inventories recognised
diakui sebagai biaya pada as an expense in supplies
persediaan dan material and materials in
di dalam “lain-lain, bersih” 2,694 5,263 “others, net”
76
Page 79
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Mutasi saldo provisi atas persediaan tidak bergerak dan The movement in the provision for slow-moving and
usang adalah sebagai berikut: obsolete inventories is as follows:
30 Juni/ 31 Desember/
June December
2025 2024
Saldo awal 1,895 1,895 Beginning balance
Pemulihan - - Recovery
Saldo akhir 1,895 1,895 Ending balance
Manajemen berpendapat bahwa provisi atas Management believes that the provision for slow-
persediaan tidak bergerak dan usang yang ditetapkan moving and obsolete inventories is adequate to cover
memadai untuk menutup resiko penurunan nilai possible losses on decline in value of inventories and
persediaan dan barang modal dan peralatan pada capital spares and equipment as of 30 June 2025 and
tanggal 30 Juni 2025 dan 31 Desember 2024. 31 December 2024.
Pada tanggal 30 Juni 2025 dan 31 Desember 2024, As of 30 June 2025 and 31 December 2024, property,
aset tetap, properti dalam sewa operasi, persediaan, plant and equipment, property on operating lease,
barang modal dan peralatan diasuransikan terhadap inventories and capital spares and equipment were
kerugian akibat kerusakan fisik berdasarkan paket polis insured against losses by physical damage under a
dengan jumlah pertanggungan asuransi AS$1.580.306 policy package with insurance coverage totalling
(31 Desember 2024: AS$1.580.306) dan risiko lainnya US$1,580,306 (31 December 2024: US$1,580,306)
berdasarkan paket polis dengan pertanggungan and other risks under a policy package with insurance
asuransi sebesar AS$489.167 (31 Desember 2024: coverage totalling US$489,167 (31 December 2024:
AS$489.167) dari PT Asuransi Central Asia dan PT US$489,167) from PT Asuransi Central Asia and
Asuransi Astra Buana, yang menurut pendapat PT Asuransi Astra Buana, which in management’s
manajemen cukup untuk menutup kemungkinan opinion is adequate to cover any possible losses that
kerugian yang mungkin timbul dari risiko yang may arise from such insured risks.
dipertanggungkan tersebut.
12. ASET TETAP 12. PROPERTY, PLANT AND EQUIPMENT
Penambahan
sehubungan
dengan akuisisi
entitas anak/ Selisih kurs
Addition related to penjabaran/
1 Januari/ acquisition Penambahan/ Transfer/ Translation 30 Juni/
January 2025 of subsidiary Additions T ransfers adjustment June 2025
Biaya peroleh an Acquisition costs
Hak guna tanah 570 - - - - 570 Land rights
Properti 8,233 - - - - 8,233 Property
Mesin, telekomunikasi dan Machineries, telecommunication
peralatan otomotif 8,411 - 74 4 (1) 8,488 and automotive equipment
Sumur produksi dan fasilitas sumur 747,679 - - 1,280 - 748,959 Production wells and well facilities
Pembangkit listrik 144,141 - - - - 144,141 Power plant
Bangunan dan infrastruktur 37,389 - 9 - - 37,398 Buildings and infrastructure
Perabotan dan perlengkapan 3,731 - - 106 - 3,837 Furniture and fixtures
Aset dalam pembangunan 132,882 - 57,587 (46,912) - 143,557 Construction in progress
Jumlah biaya perolehan 1,083,036 - 57,670 (45,522) (1) 1,095,183 Total acquisition costs
Aku mulasi p enyusu tan Accumulated depreciation
Hak guna tanah (250) - (8) - - (258) Land rights
Properti (2,689) - (173) - - (2,862) Property
Mesin, telekomunikasi dan Machineries telecommunication
peralatan otomotif (7,118) - (238) - - (7,356) and automotive equipment
Sumur produksi dan fasilitas sumur (170,072) - (22,199) - - (192,271) Production wells and well facilities
Pembangkit listrik (43,709) - (4,231) - - (47,940) Power plant
Bangunan dan infrastruktur (20,308) - (1,191) - - (21,499) Buildings and infrastructure
Perabotan dan perlengkapan (2,932) - (281) - - (3,213) Furniture and fixtures
Jumlah akumulasi penyusutan (247,078) - (28,321) - - (275,399) Total accumulated depreciation
Nilai buku bersih 835,958 819,784 Net book value
77
Page 80
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Penambahan
sehubungan
dengan akuisisi
entitas anak/ Selisih kurs
Addition related to penjabaran/
1 Januari/ acquisition Penambahan/ Transfer/ Translation 31 Desember/
January 2024 of subsidiary Additions Transfers adjustment December 2024
Biaya perolehan Acquisition costs
Hak guna tanah 263 398 - (91) - 570 Land rights
Properti 8,233 - - - - 8,233 Property
Mesin, telekomunikasi dan Machineries, telecommunication
peralatan otomotif 5,630 2,193 66 537 (15) 8,411 and automotive equipment
Sumur produksi dan fasilitas sumur 643,868 - 1 103,810 - 747,679 Production wells and well facilities
Pembangkit listrik - 144,127 14 - - 144,141 Power plant
Bangunan dan infrastruktur 35,735 1,648 6 - - 37,389 Buildings and infrastructure
Perabotan dan perlengkapan 3,555 103 53 20 - 3,731 Furniture and fixtures
Aset dalam pembangunan 59,489 425 114,949 (41,973) (8) 132,882 Construction in progress
Jumlah biaya perolehan 756,773 148,894 115,089 62,303 (23) 1,083,036 Total acquisition costs
Akumulasi penyusutan Accumulated depreciation
Hak guna tanah (220) - (30) - - (250) Land rights
Properti (2,342) - (347) - - (2,689) Property
Mesin, telekomunikasi dan Machineries telecommunication
peralatan otomotif (5,401) (1,405) (298) - (14) (7,118) and automotive equipment
Sumur produksi dan fasilitas sumur (135,404) - (34,668) - - (170,072) Production wells and well facilities
Pembangkit listrik - (38,275) (5,434) - - (43,709) Power plant
Bangunan dan infrastruktur (17,442) (508) (2,358) - - (20,308) Buildings and infrastructure
Perabotan dan perlengkapan (2,319) (89) (524) - - (2,932) Furniture and fixtures
Jumlah akumulasi penyusutan (163,128) (40,277) (43,659) - (14) (247,078) Total accumulated depreciation
Nilai buku bersih 593,645 835,958 Net book value
Beban penyusutan dan amortisasi untuk tahun-tahun Depreciation and amortisation expense for the years
yang berakhir pada tanggal 30 Juni 2025 dan 31 ended 30 June 2025 and 31 December 2024 charged
Desember 2024 dibebankan sebagai beban operasi as operating expenses were as follows:
adalah sebagai berikut:
30 Juni/ 30 Juni/
June June
2025 2024
Depresiasi aset tetap (28,321) (18,682) Property, plant and equipment depreciation
Depresiasi aset sewa operasi Property on operating lease
(Catatan 13) (14,364) (14,430) depreciation (Note 13)
Amortisasi aset tidak berwujud Amortisation of intangible assets
(Catatan 14) (1,734) (90) (Note 14)
Amortisasi biaya ditangguhkan (2,278) (2,674) Amortisation of deferred charges
Amortisasi aset hak guna (1,038) (1,068) Amortisation of right-of-use assets
Subjumlah (47,735) (36,944) Subtotal
Dikurangkan: Less:
Kapitalisasi ke biaya pengembangan Capitalised to project development
proyek 7 - cost
Jumlah (47,728) (36,944) Total
78
Page 81
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Aset tetap tertentu direklasifikasi dari/ke aset sewa Certain property, plant and equipment were reclassified
operasi, biaya ditangguhkan dan aset tidak berwujud. from/to property on operating lease, deferred charges
and intangible assets.
Untuk tahun yang berakhir pada tanggal 30 Juni 2025 For the years ended 30 June 2025 and 31 December
dan 31 Desember 2024, total transfer dari aset dalam 2024, total transfers from construction in progress to
pembangunan ke saldo akun lainnya adalah sebagai other account balances were as follows:
berikut:
30 Juni/ 31 Desember/
June December
2025 2024
Transfer ke biaya ditangguhkan (1,319) (4,743) Transfer to deferred charges
Transfer ke aset sewa operasi Transfer to property on operating
(Catatan 13) (490) (794) lease (Note 13)
Transfer ke biaya pengembangan proyek - (91) Transfer to project development costs
Transfer ke piutang sewa pembiayaan (43,713) - Transfer to finance lease receivables
Transfer dari aset tidak berwujud Transfer from intangible assets
(Catatan 14) - 67,931 (Note 14)
Jumlah (45,522) 62,303 Total
Jumlah biaya perolehan aset tetap yang telah Total acquisition costs of property, plant and equipment
disusutkan penuh tetapi masih digunakan Grup pada which were fully depreciated but still in use by the Group
tanggal 30 Juni 2025 sebesar AS$52.585 (31 Desember as of 30 June 2025 amounted to US$52,585 (31
2024: AS$52.240). December 2024: US$52,240).
Tidak terdapat aset tetap yang tidak dipakai sementara There are no property, plant and equipment that are
atau yang berasal dari hibah. Tidak ada aset tetap Grup temporarily not in use or derived from grants. None of
yang diklasifikasikan sebagai tersedia untuk dijual. the Group’s property, plant and equipment are classified
as available for sale.
Aset dalam pembangunan merupakan proyek yang Construction in progress represents projects that were
belum selesai pada tanggal 30 Juni 2025 dan 31 not completed as at 30 June 2025 and 31 December
Desember 2024, dengan rincian sebagai berikut: 2024 with details as follows:
79
Page 82
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
30 Juni/June 2025
Persentase Estimasi
penyelesaian/ penyelesaian/
Nilai/ Percentage of Estimated
Nama proyek Amount completion completion Project name
Salak Salak
Proyek pengembangan Salak unit 7 22,554 16% Kuartal keempat Salak unit 7 development project
tahun/ Fourth
quartal of 2026
Proyek retrofit Salak unit 4,5,6 14,432 81% Kuartal kedua Salak unit 4,5,6 retrofit project
tahun/ Second
quartal of 2025
Lainnya (masing-masing di bawah Others (each below
AS$4 juta) 16,449 2 - 95% Bervariasi/Various US$4 million)
Sub-jumlah 53,435 Sub-total
Darajat Darajat
Proyek retrofit Darajat unit 3 5,247 14% Kuartal keempat Darajat unit 3 retrofit project
tahun/ Fourth
quartal of 2026
Lainnya (masing-masing Others (each below
di bawah AS$4 juta) 4,463 2 - 95% Bervariasi/ Various US$4 million)
Sub-jumlah 9,710 Sub-total
Wayang Windu Wayang Windu
Proyek pengembangan unit 3 32,384 27% Kuartal keempat Unit 3 development peject
tahun/ Fourth
quartal of 2026
Proyek retrofit unit 1 & 2 15,380 56% Kuartal pertama Unit 1 & 2 retrofit project
tahun/ First
quartal of 2026
Lainnya (masing-masing dibawah Others (each below
AS$4 juta) 10,759 2 - 95% Bervariasi/ Various US$4 million)
Sub-jumlah 58,523 Sub-total
Drilling services Drilling services
Rig 19,022 90% Kuartal keempat Rig
tahun/ Fourth
quartal of 2025
Lain-lain Others
Lainnya (masing-masing Others (each below
di bawah AS$4 juta) 2,867 2 - 95% Bervariasi/Various US$4 million)
Jumlah 143,557 Total
80
Page 83
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
31 Desember/December 31, 2024
Persentase Estimasi
penyelesaian/ penyelesaian/
Nilai/ Percentage of Estimated
Nama proyek Amount completion completion Project name
Salak Salak
Proyek pembangkit listrik binary 42,558 98% Kuartal pertama Binary power plant project
tahun/ First
quartal of 2025
Proyek retrofit Salak unit 4,5,6 14,417 60% Desember Salak unit 4,5,6 retrofit project
/December 2025
Proyek pengembangan Salak unit 7 5,480 2% Kuartal keempat Salak unit 7 development project
tahun/ Fourth
quartal of 2026
Lainnya (masing-masing di bawah Others (each below
AS$4 juta) 8,508 2 - 95% Bervariasi/Various US$4 million)
Sub-jumlah 70,963 Sub-total
Darajat Darajat
Proyek retrofit Darajat unit 3 5,303 0% Kuartal keempat Darajat unit 3 retrofit project
tahun/ Fourth
quartal of 2026
Lainnya (masing-masing Others (each below
di bawah AS$4 juta) 3,547 2 - 95% Bervariasi/ Various US$4 million)
Sub-jumlah 8,850 Sub-total
Wayang Windu Wayang Windu
Proyek pengembangan unit 3 16,306 5% Kuartal keempat Unit 3 development peject
tahun/ Fourth
quartal of 2026
Proyek retrofit unit 1 & 2 10,294 9% Kuartal pertama Unit 1 & 2 retrofit project
tahun/ First
quartal of 2026
Lainnya (masing-masing dibawah Others (each below
AS$4 juta) 9,918 2 - 95% Bervariasi/ Various US$4 million)
Sub-jumlah 36,518 Sub-total
Drilling services Drilling services
Rig 15,531 75% Kuartal kedua Rig
tahun/ Second
quartal of 2025
Lain-lain Others
Lainnya (masing-masing Others (each below
di bawah AS$4 juta) 1,020 2 - 95% Bervariasi/Various US$4 million)
Jumlah 132,882 Total
81
Page 84
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Pada tanggal 30 Juni 2025 dan 31 Desember 2024, As of 30 June 2025 and 31 December 2024, property,
aset tetap, properti dalam sewa operasi, persediaan, plant and equipment, property on operating lease,
barang modal dan peralatan diasuransikan terhadap inventories and capital spares and equipment were
kerugian akibat kerusakan fisik berdasarkan paket polis insured against losses by physical damage under a
dengan jumlah pertanggungan asuransi AS$1.580.306 policy package with insurance coverage totalling
(31 Desember 2024: AS$1.580.306) dan risiko lainnya US$1,580,306 (31 December 2024: US$1,580,306)
berdasarkan paket polis dengan pertanggungan and other risks under a policy package with insurance
asuransi sebesar AS$489.167 (31 Desember 2024: coverage totalling US$489,167 (31 December 2024:
AS$489.167) dari PT Asuransi Central Asia dan PT US$489,167) from PT Asuransi Central Asia and
Asuransi Astra Buana, yang menurut pendapat PT Asuransi Astra Buana, which in management’s
manajemen cukup untuk menutup kemungkinan opinion is adequate to cover any possible losses that
kerugian yang mungkin timbul dari risiko yang may arise from such insured risks.
dipertanggungkan tersebut.
Lihat Catatan 14 untuk rincian hasil pengujian Refer to Note 14 for details of the result of the
penurunan nilai pada tanggal 30 Juni 2025 dan 31 impairment assessment as of 30 June 2025 and
Desember 2024. December 2024.
Pada tanggal 13 Desember 2022, SEGSPL On 13 December 2022, SEGSPL entered into an
menandatangani perjanjian dengan PT Fuji Electric agreement with PT Fuji Electric Indonesia for the
Indonesia untuk pembelian retrofit rotors yang akan purchase of retrofit rotors which will be fully received by
seluruhnya diterima pada semester kedua 2025. second semester of 2025.
Pada tanggal 31 Oktober 2023, SEGDS On 31 October 2023, SEGDS entered into an
menandatangani perjanjian dengan Sichuan Honghua agreement with Sichuan Honghua Petroleum
Petroleum Equipment Co., Ltd untuk pembelian unit Equipment Co., Ltd for the purchase of a land drilling
pemboran darat yang akan difabrikasi dan akan selesai unit which will be fabricated and will be completed on
pada semester pertama 2025. first semester of 2025.
Pada tanggal 30 September 2024, SEGD-II On 30 September 2024, SEGD-II entered into an
menandatangani perjanjian dengan PT Mitsubishi agreement with PT Mitsubishi Power Indonesia for the
Power Indonesia untuk pembelian retrofit rotors untuk purchase of retrofit rotors for Unit 3 which will be fully
Unit 3 yang akan seluruhnya diterima pada kuartal received by fourth quartal of 2026.
keempat tahun 2026.
Pada tanggal 17 Mei 2024, SEGWWL menandatangani On 17 May 2024, SEGWWL entered into an agreement
perjanjian dengan Fuji Electric Co., Ltd untuk with Fuji Electric Co., Ltd for the purchase of retrofit
pembelian retrofit rotors untuk Unit 1 & 2 yang akan rotors for Unit 1 & 2 which will be fully received by first
seluruhnya diterima pada kuartal pertama tahun 2026. quartal of 2026.
Pada tanggal 30 September 2024, SEGWWL On 30 September 2024, SEGWWL signed an
menandatangani perjanjian dengan PT Inti Karya agreement with PT Inti Karya Persada Tehnik to
Persada Tehnik untuk mengembangkan Proyek develop the Power Plant Project Unit 3 at the Wayang
Pembangkit Listrik Unit 3 di area panas bumi Wayang Windu geothermal field which will expire on
Windu yang akan berakhir pada kuartal keempat tahun fourth quartal of 2026.
2026.
82
Page 85
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
13. ASET SEWA OPERASI 13. PROPERTY ON OPERATING LEASE
1 Januari/ Penambahan/ Transfer/ 30 Juni/
January 2025 Additions Transfers June 2025
Biaya perolehan Acquisition costs
Hak guna tanah 2,046 - - 2,046 Land rights
Bangunan 8,593 - - 8,593 Buildings
Kendaraan 1,063 - 19 1,082 Vehicles
Fasilitas lapangan 748,892 - 467 749,359 Field facilities
Perabotan dan perlengkapan 8,865 - 4 8,869 Furniture and fixtures
Jumlah 769,459 - 490 769,949 Total
Akumulasi penyusutan Accumulated depreciation
Hak guna tanah 1,713 32 - 1,745 Land rights
Bangunan 5,096 180 - 5,276 Buildings
Kendaraan 1,063 2 - 1,065 Vehicles
Fasilitas lapangan 445,405 14,001 - 459,406 Field facilities
Perabotan dan perlengkapan 7,018 149 - 7,167 Furniture and fixtures
Jumlah 460,295 14,364 - 474,659 Total
Nilai buku bersih 309,164 295,290 Net book value
1 Januari/ Penambahan/ Transfer/ 31 Desember/
January 2024 Additions Transfers December 2024
Biaya perolehan Acquisition costs
Hak guna tanah 2,046 - - 2,046 Land rights
Bangunan 8,593 - - 8,593 Buildings
Kendaraan 1,063 - - 1,063 Vehicles
Fasilitas lapangan 748,741 - 151 748,892 Field facilities
Perabotan dan perlengkapan 8,222 - 643 8,865 Furniture and fixtures
Jumlah 768,665 - 794 769,459 Total
Akumulasi penyusutan Accumulated depreciation
Hak guna tanah 1,648 65 - 1,713 Land rights
Bangunan 4,736 360 - 5,096 Buildings
Kendaraan 1,063 - - 1,063 Vehicles
Fasilitas lapangan 417,312 28,093 - 445,405 Field facilities
Perabotan dan perlengkapan 6,713 305 - 7,018 Furniture and fixtures
Jumlah 431,472 28,823 - 460,295 Total
Nilai buku bersih 337,193 309,164 Net book value
Klasifikasi aset sewa operasi sesuai dengan penilaian Property on operating lease classification is in
manajemen atas pengaturan kontraktual JOC Wayang accordance with management’s assessment of the
Windu. contractual arrangements of the Wayang Windu JOC.
Transfer untuk tahun-tahun yang berakhir pada Transfers for years ended 30 June 2025 and December
30 Juni 2025 dan 31 Desember 2024 berasal dari aset 2024 are from property, plant and equipment (Note 12).
tetap (Catatan 12).
Manajemen berkeyakinan bahwa tidak terdapat Management believes that there were no events or
peristiwa atau perubahan keadaan pada tanggal changes in circumstances as of 30 June 2025 and
30 Juni 2025 dan 31 Desember 2024 yang December 2024 that indicate any impairment in the
mengindikasikan penurunan nilai aset sewa operasi Group’s property on operating lease.
Grup.
Piutang pembayaran sewa minimum di masa depan Future minimum lease payment receivables under the
berdasarkan ESC untuk pengaturan sewa yang tidak ESC for non-cancellable lease arrangements are as
dapat dibatalkan adalah sebagai berikut (tidak follows (undiscounted):
didiskonto):
83
Page 86
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
30 Juni/ 31 Desember/
June December
2025 2024
Piutang pembayaran sewa minimum: Minimum lease payments receivable:
Tidak lebih dari satu tahun 155,878 153,689 Not later than one year
Lebih dari satu tahun namun Later than one year
tidak lebih dari lima tahun 636,751 631,780 but not later than five years
Lebih dari lima tahun 1,370,447 1,533,485 Later than five years
Piutang pembayaran sewa Net minimum lease
minimum bersih 2,163,076 2,318,954 payment receivables
14. ASET TIDAK BERWUJUD 14. INTANGIBLE ASSETS
Penambahan
sehubungan
dengan akuisisi
entitas anak/
Addition related to
1 Januari/ acquisition Penambahan/ Transfer/ 30 Juni/
January 2025 of subsidiary Additions Transfers June 2025
Biaya p erolehan Acq uisition costs
Properti yang belum dikembangkan 885,298 - - - 885,298 Undeveloped properties
Goodwill 498,027 - - - 498,027 Goodwill
Kontrak pelanggan 78,709 - - - 78,709 Customer contract
Perangkat lunak 3,134 - - - 3,134 Software
Bonus 3,736 - - - 3,736 Bonuses
Kredit karbon 1,758 - - - 1,758 Carbon credits
Jumlah biaya perolehan 1,470,662 - - - 1,470,662 Total acquisition costs
Akumu lasi pen yusutan Accu mu lated d epreciation
Perangkat lunak 3,114 - 5 - 3,119 Software
Kontrak pelanggan 2,460 - 1,639 - 4,099 Customer contract
Bonus 1,472 - 90 - 1,562 Bonuses
Kredit karbon 1,187 - - - 1,187 Carbon credits
Jumlah akumulasi penyusutan 8,233 - 1,734 - 9,967 Total accumulated depreciation
Nilai buku bersih 1,462,429 1,460,695 Net book value
Penambahan
sehubungan
dengan akuisisi
entitas anak/
Addition related to
1 Januari/ acquisition Penambahan/ Transfer/ 31 Desember/
January 2024 of subsidiary Additions Transfers December 2024
Biaya perolehan Acquisition costs
Properti yang belum dikembangkan 953,229 - - (67,931) 885,298 Undeveloped properties
Goodwill 485,814 12,213 - - 498,027 Goodwill
Kontrak pelanggan - 78,709 - - 78,709 Customer contract
Perangkat lunak 3,108 26 - - 3,134 Software
Bonus 3,736 - - - 3,736 Bonuses
Kredit karbon 1,758 - - - 1,758 Carbon credits
Jumlah biaya perolehan 1,447,645 90,948 - (67,931) 1,470,662 Total acquisition costs
Akumulasi penyusutan Accumulated depreciation
Perangkat lunak 3,108 - 6 - 3,114 Software
Kontrak pelanggan - - 2,460 - 2,460 Customer contract
Bonus 1,292 - 180 - 1,472 Bonuses
Kredit karbon 1,187 - - - 1,187 Carbon credits
Jumlah akumulasi penyusutan 5,587 - 2,646 - 8,233 Total accumulated depreciation
Nilai buku bersih 1,442,058 1,462,429 Net book value
84
Page 87
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Untuk tahun yang berakhir pada tanggal 30 Juni 2025, For the year ended 30 June 2025, transfers from
transfer dari properti yang belum dikembangkan undeveloped properties amounted to US$nil (31
sebesar AS$nihil (31 Desember 2024: AS$67.931), December 2024: US$67,931), representing transfers to
merupakan transfer ke sumur produksi dan fasilitas production wells and well facilities as part of property,
sumur sebagai bagian dari aset tetap) (Catatan 12). plant and equipment) (Note 12).
Properti yang belum dikembangkan Undeveloped properties
Properti yang belum dikembangkan pada tanggal Undeveloped properties at 30 June 2025 and 31
30 Juni 2025 dan 31 Desember 2024 dialokasikan ke December 2024 are allocated to the Salak JOC and
JOC Salak dan JOC Darajat berdasarkan alokasi harga Darajat JOC based on the purchase price allocation
beli yang dibuat saat mengakuisisi operasi Salak dan made when acquiring the Salak and Darajat operations
Darajat dari CVX (Catatan 1.c). from CVX (Note 1.c).
Selama periode yang berakhir pada tanggal During the period ended 30 June 2025 there were no
30 Juni 2025 tidak ada sumur yang diselesaikan dan wells completed and no costs were reclassified from
tidak ada biaya yang direklasifikasi dari properti yang undeveloped properties to production wells and well
belum dikembangkan menjadi sumur produksi dan facilities in property, plant and equipment (31
fasilitas sumur dalam aset tetap (31 Desember 2024: December 2024: five wells were completed).
lima sumur telah diselesaikan).
Kontrak pelanggan Customer contract
Pada tanggal 31 Desember 2024, kontrak pelanggan As of 31 December 2024, customer contract is
dialokasikan ke BWE berdasarkan alokasi harga beli allocated to the BWE based on the purchase price
yang dibuat saat mengakuisisi Sidrap Bayu Energi allocation made when acquiring the Sidrap Bayu Energi
(“SBE”) dari UPC. (“SBE”) from UPC.
Goodwill Goodwill
Goodwill pada tanggal 30 Juni 2025 dan 31 Desember Goodwill as of 30 June 2025 and 31 December 2024
2024 merupakan goodwill yang diakui dari akuisisi represents goodwill recognised on the acquisition of the
operasi Salak dan Darajat dari CVX (Catatan 1.c) Salak and Darajat operations from CVX (Note 1.c).
Penambahan goodwill berasal dari akuisisi SBE dan Additional goodwill represents goodwill from acquisition
OMI. (Catatan 6) of SBE and OMI. (Note 6)
Pengujian penurunan nilai Impairment assessment
Grup melakukan pengujian atas penurunan nilai untuk The Group performed an assessment of impairment for
goodwill, properti yang belum dikembangkan, biaya goodwill, undeveloped properties, deferred charges
ditangguhkan dan aset tetap dari UPK Salak dan and property, plant and equipment of the Salak and
Darajat senilai AS$2.067.311 pada tanggal Darajat CGUs totalling US$2,067,311 as at
30 Juni 2025. Manajemen berpendapat bahwa tidak 30 June 2025. Management is of the opinion that there
ada penurunan nilai atas operasi Salak dan Darajat is no impairment of the Salak and Darajat operations as
pada tanggal 30 Juni 2025 dan 31 Desember 2024. at 30 June 2025 and 31 December 2024.
Jumlah masing-masing UPK yang dapat dipulihkan The recoverable amount of each CGU was determined
ditentukan berdasarkan VIU. Masing-masing operasi based on VIU. Each of the Salak and Darajat operations
Salak dan Darajat diperlakukan sebagai UPK terpisah. are treated as a separate CGU. Cash flow projections
Proyeksi arus kas yang digunakan dalam perhitungan used in the VIU calculations were based on financial
VIU didasarkan pada anggaran keuangan yang budgets approved by management covering a five-year
disetujui manajemen untuk periode lima tahun. Arus period. Cash flows beyond the five-year period were
kas setelah periode lima tahun diekstrapolasikan extrapolated using the estimated growth rates stated
dengan menggunakan estimasi tingkat pertumbuhan below. The growth rates did not exceed the average
yang dinyatakan di bawah ini. Tingkat pertumbuhan historical growth rate.
tidak melebihi rata-rata tingkat pertumbuhan historis.
Asumsi-asumsi utama yang digunakan dalam The key assumptions used in the assessment on
pengujian penurunan nilai goodwill, properti yang impairment in value of goodwill, undeveloped
belum dikembangkan, biaya ditangguhkan dan aset properties, deferred charges and property, plant and
tetap pada tanggal 30 Juni 2025 adalah tingkat diskonto equipment as of 30 June 2025 are estimated pre-tax
sebelum pajak sebesar 8,55% discount rate of 8.55% and annual growth rate of 2.5%
dan tingkat pertumbuhan tahunan sebesar 2,5% yang used in estimating the discounted cash flows. The
digunakan dalam memperkirakan arus kas yang prices for future electricity and steam used in the
didiskontokan. Harga listrik dan uap di masa discounted cash flows are based on the contracts with
mendatang yang digunakan dalam arus kas yang PLN. As a result of the analysis, there is a total
didiskontokan didasarkan pada kontrak dengan PLN. headroom of US$894,729 as of
Sebagai hasil dari analisis tersebut, terdapat headroom 30 June 2025.
sebesar AS$894.729 pada tanggal 30 Juni 2025.
85
Page 88
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Manajemen berpendapat bahwa tidak ada Management is of the opinion that there was no
kemungkinan perubahan dalam asumsi utama yang reasonably possible change in any of the key
disebutkan di atas yang akan menyebabkan nilai assumptions stated above that would cause the
tercatat UPK secara material melebihi jumlah carrying amount of the CGUs to materially exceed their
terpulihkannya. recoverable amounts.
15. UTANG USAHA DAN UTANG LAIN-LAIN, DAN 15. TRADE AND OTHER PAYABLES, AND ACCRUED
BEBAN YANG MASIH HARUS DIBAYAR EXPENSES
30 Juni/ 31 Desember/
June December
2025 2024
Lancar Current
Utang usaha – pihak ketiga: Trade payables – third parties:
PT Unelec Indonesia 1,166 - PT Unelec Indonesia
PT Citra Tubindo Tbk 982 212 PT Citra Tubindo Tbk
PT Golden Pratama Engineering 714 180 PT Golden Pratama Engineering
Scientific Drilling International 446 166 Scientific Drilling International
PT Putra Andalan Perkasa 307 - PT Putra Andalan Perkasa
PT Mitsubishi Power Indonesia 21 5,264 PT Mitsubishi Power Indonesia
Schlumberger Geophysics Nusantara 140 995 Schlumberger Geophysics Nusantara
PT Krakatau Pipe Industries - 662 PT Krakatau Pipe Industries
PT BJ Services Indonesia - 389 PT BJ Services Indonesia
PT Cipta Bangun Nusantara 58 350 PT Cipta Bangun Nusantara
Lainnya 3,556 6,000 Lainnya
Sub-jumlah 7,390 14,218 Sub-total
Utang lain-lain – pihak ketiga: Other payables – third parties:
ACEHI 10 4,864 ACEHI
Karyawan 709 716 Employees
Lainnya 707 1,306 Others
Sub-jumlah 1,426 6,886 Sub-total
Utang lain-lain – pihak berelasi: Other payables – related parties
PT Griya Idola 10 97 PT Griya Idola
Beban yang masih harus dibayar Accrued expenses:
Beban bunga 32,727 39,859 Interest expense
Lainnya - pihak ketiga 48,252 47,260 Others - third parties
Sub-jumlah 80,979 87,119 Sub-total
Tidak Lancar Non current
Utang lain-lain – pihak ketiga: Other payables – third parties:
ACEHI 328 7,377 ACEHI
Jumlah 90,133 115,697 Total
Berdasarkan mata uang: By currency:
Dolar AS 54,102 91,480 US Dollars
Rupiah 36,031 24,105 Rupiah
Others - 112 Others
Utang usaha dan utang lain-lain dan Trade and other payables
beban yang masih harus dibayar 90,133 115,697 and accrued expenses
Pada tanggal 31 Desember 2024, utang lain - lain – pihak As of 31 December 2024, other payables - third parties
ketiga merupakan utang kepada pihak non-pengendali represent payables to non-controlling parties of
dari entitas anak, yang diperoleh dari akuisisi SIDRAP 2, subsidiary, obtained from the acquisition of SIDRAP 2,
LOMBOK dan SUKABUMI (Catatan 6.a, b, c). LOMBOK dan SUKABUMI (Note 6.a,b,c).
Pada tanggal 30 Juni 2025, beban yang masih harus As at 30 June 2025, accrued expenses - others - third
dibayar - lainnya - pihak ketiga terdiri dari beban yang parties primarily represents accruals for purchase of
masih harus dibayar untuk pembelian barang dan jasa goods and services of US$41,903 (31 December 2024:
sebesar AS$41,903 (31 Desember 2024: AS$41.448), US$41,448), production allowance to PGE of US$4,608
tunjangan produksi untuk PGE sebesar AS$4,608 (31 (31 December 2024: US$4,039) and production bonus
Desember 2024: AS$4,039) dan produksi bonus sebesar of US$1,741 (31 December 2024: US$1,773)
AS$1.741 (31 Desember 2024: AS$1.773)
86
Page 89
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
16. PINJAMAN 16. BORROWINGS
30 Juni/ 31 Desember/
June December
2025 2024
Pinjaman Borrowings
Bagian lancar: Current portion:
Senior secured notes 77,563 101,352 Senior secured notes
Utang bank 113,793 101,261 Bank loan
Sub-jumlah 191,356 202,613 Sub-total
Bagian tidak lancar: Non-current portion:
Senior secured notes 1,282,719 1,316,955 Senior secured notes
Utang bank 559,235 577,669 Bank loan
Sub-jumlah 1,841,954 1,894,624 Sub-total
Jumlah 2,033,310 2,097,237 Total
Sisa jatuh tempo kontraktual dari total The remaining contractual maturities of
pinjaman adalah sebagai berikut: the total borrowings are as follows:
Senior secured notes: Senior secured notes:
Tidak lebih dari satu tahun 77,563 101,352 Not later than one year
Di antara satu dan lima tahun 357,305 341,926 Between one and five years
Lebih dari lima tahun 939,137 989,817 Above five years
Utang bank: Bank loan:
Tidak lebih dari satu tahun 113,793 101,261 Not later than one year -
Di antara satu dan lima tahun 460,879 475,410 Between one and five years -
Lebih dari lima tahun 108,787 112,708 Above five years
2,057,464 2,122,474
Dikurangi: Less:
Biaya keuangan tangguhan yang Unamortised deferred
belum diamortisasi: financing costs:
Senior secured notes (13,723) (14,788) Senior secured notes
Utang bank (10,431) (10,449) Bank loan
Sub-jumlah (24,154) (25,237) Sub-total
Jumlah 2,033,310 2,097,237 Total
Termasuk dalam pinjaman adalah jumlah yang terkait Included in the borrowings are amounts relating to
dengan biaya pendanaan yang ditangguhkan, sebagai deferred financing costs, which are as follows:
berikut:
30 Juni/ 31 Desember/
June December
2025 2024
Biaya 90,361 89,468 Cost
Akumulasi amortisasi (66,207) (64,231) Accumulated amortisation
Jumlah 24,154 25,237 Total
Pada tanggal 30 Juni 2025 dan 31 Desember 2024, Grup As of 30 June 2025 and 31 December 2024, the Group
telah memenuhi pembatasan yang diwajibkan. has complied with the required covenants.
87
Page 90
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Senior secured notes Senior secured notes
Notes 2033 2033 Notes
Pada tanggal 24 April 2018, SEGWWL menerbitkan On 24 April 2018, SEGWWL issued an aggregate
jumlah pokok agregat sebesar AS$580.000 6,75% senior principal amount of US$580,000 6.75% senior secured
secured notes yang jatuh tempo pada tahun 2033 (“Notes notes due in 2033 (the “2033 Notes”). The 2033 Notes
2033”). Notes 2033 dikenakan bunga sebesar 6,75% per bear interest at the rate of 6.75% per annum. Interest on
tahun. Bunga atas Notes 2033 dibayarkan pada tanggal the 2033 Notes is payable on 24 April and 24 October of
24 April dan 24 Oktober setiap tahun, dimulai pada tanggal each year, beginning on 24 October 2018. The 2033
24 Oktober 2018. Notes 2033 akan jatuh tempo pada Notes will mature on 24 April 2033.
tanggal 24 April 2033.
Berdasarkan Indenture Notes 2033, jadwal pembayaran Based on the 2033 Notes Indenture, the repayment
adalah sebagai berikut: schedule is as follows:
Persentase dari nilai pokok awal/
Percentage of original principal amount
Tanggal pembayaran Payment date
24 Oktober 2018 1.70% 24 October 2018
24 April 2019 2.50% 24 April 2019
24 Oktober 2019 3.80% 24 October 2019
24 April 2020 1.30% 24 April 2020
24 Oktober 2020 0.00% 24 October 2020
24 April 2021 2.03% 24 April 2021
24 Oktober 2021 4.80% 24 October 2021
24 April 2022 1.60% 24 April 2022
24 Oktober 2022 1.19% 24 October 2022
24 April 2023 0.00% 24 April 2023
24 Oktober 2023 0.00% 24 October 2023
24 April 2024 2.78% 24 April 2024
24 Oktober 2024 3.80% 24 October 2024
24 April 2025 6.05% 24 April 2025
24 Oktober 2025 4.70% 24 October 2025
24 April 2026 3.50% 24 April 2026
24 Oktober 2026 1.27% 24 October 2026
24 April 2027 0.72% 24 April 2027
24 Oktober 2027 0.08% 24 October 2027
24 April 2028 2.15% 24 April 2028
24 Oktober 2028 3.82% 24 October 2028
24 April 2029 7.31% 24 April 2029
24 Oktober 2029 7.00% 24 October 2029
24 April 2030 4.60% 24 April 2030
24 Oktober 2030 6.30% 24 October 2030
24 April 2031 4.20% 24 April 2031
24 Oktober 2031 7.40% 24 October 2031
24 April 2032 4.20% 24 April 2032
24 Oktober 2032 7.00% 24 October 2032
Semua jumlah pokok yang tersisa/
24 April 2033 24 April 2033
All remaining outstanding principal amounts
SEGWWL dapat menebus Notes 2033, seluruhnya atau SEGWWL may redeem the 2033 Notes, in whole or in
sebagian, kapan saja sebelum 24 April 2026, dengan part, at any time prior to 24 April 2026, at a redemption
harga penebusan yang setara dengan yang lebih besar price equal to the greater of the following:
dari berikut ini:
(1) 100% dari jumlah pokok Notes tersebut; dan (1) 100% of the principal amount of such Notes; and
88
Page 91
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
(2) jumlah dari (a) 100% dari jumlah pokok Notes (2) the sum of (a) 100% of the principal amount of such
tersebut yang akan dilunasi pada tanggal 24 April Notes to be redeemed as would otherwise have been
2026 dan (b) nilai kini dari setiap sisa pembayaran outstanding as at 24 April 2026 and (b) the present
pokok dan bunga terjadwal atas Notes yang akan value of each remaining scheduled payment of
ditebus (tidak termasuk bunga yang masih harus principal and interest on the Notes to be redeemed
dibayar dan belum dibayar sampai (namun tidak (exclusive of interest accrued and unpaid to (but not
termasuk) tanggal penebusan) sampai dengan 24 including) the redemption date) up to
April 2026, didiskontokan ke tanggal penebusan 24 April 2026, discounted to the redemption date on a
secara setengah tahunan (dengan asumsi satu semi-annual basis (assuming a 360 day year
tahun 360 hari terdiri dari dua belas 30-hari bulan) consisting of twelve 30-day months) at the treasury
dengan Tingkat Perbendaharaan ditambah 50 basis rate plus 50 basis points.
poin.
Ditambah, dalam setiap kasus, bunga yang masih harus Plus, in each case, accrued and unpaid interest on the
dibayar dan belum dibayar atas jumlah pokok Notes principal amount of the Notes up to, but not including, the
sampai dengan, tetapi tidak termasuk, tanggal penebusan date of redemption (subject to the right of the holder of
(tunduk pada hak pemegang catatan pada tanggal record on the relevant record date to receive interest due
pencatatan yang relevan untuk menerima bunga yang on the relevant interest payment date).
jatuh tempo atas bunga yang relevan tanggal
pembayaran).
Setiap saat pada atau setelah 24 April 2026, SEGWWL At any time on or after 24 April 2026, SEGWWL may
dapat menebus Notes 2033, seluruhnya atau sebagian, redeem the 2033 Notes, in whole or in part, at the
dengan harga penebusan yang setara dengan persentase redemption prices equal to the percentage of the
jumlah pokok Notes 2033 yang harus ditebus yang principal amount of the 2033 Notes to be redeemed set
tercantum di bawah ini ditambah akrual dan bunga yang out below plus accrued and unpaid interest, if any, to the
belum dibayar, jika ada, sampai tanggal penebusan jika redemption date if redeemed during the 12-month period
ditebus selama periode 12 bulan yang dimulai pada beginning on 24 April of the years indicated below:
tanggal 24 April tahun-tahun yang disebutkan di bawah ini:
Tahun/Year Persentase/Percentage
2026 103.38%
2027 101.69%
2028 100.84%
2029 dan seterusnya/and thereafter 100.00%
Manajemen berpendapat bahwa pelaksanaan opsi Management is of the opinion that exercising the
pelunasan dipercepat sebelum tanggal 24 April 2026 prepayment option prior to 24 April 2026 is not
tidak menguntungkan secara ekonomi bagi Grup karena economically beneficial to the Group as the prepayment
biaya penalti pelunasan dipercepat secara signifikan penalty cost is significantly higher than the interest rate
lebih tinggi daripada penghematan suku bunga jika saving if it is being refinanced, therefore, management
dibiayai kembali, oleh karena itu, manajemen tidak does not intend to exercise such option in the near
bermaksud untuk melaksanakan opsi tersebut dalam future. Management is also of the opinion that the
waktu dekat. Manajemen juga berpendapat bahwa opsi prepayment option on or after 24 April 2026 only
pembayaran di muka pada atau setelah 24 April 2026 reimburses the holders of the 2033 Notes for an amount
hanya mengganti pemegang Notes 2033 dengan jumlah up to the approximate present value of lost interest for
sampai dengan perkiraan nilai sekarang dari bunga the remaining term of the 2033 Notes with an
yang hilang untuk sisa jangka waktu Notes 2033 dengan insignificant differential, and therefore the fair value of
perbedaan yang tidak signifikan, dan karenanya nilai the prepayment option is not significant.
wajar opsi pembayaran di muka tidak signifikan.
Notes 2033 adalah kewajiban langsung, tanpa syarat The 2033 Notes are direct, unconditional and senior
dan jaminan senior. Notes 2033 dijamin dengan agunan secured obligations. The 2033 Notes are secured by
seperti; jaminan fidusia atas aset berwujud yang terdiri collateral such as; fiduciary security over the tangible
dari fasilitas pembangkit listrik yang terletak di Unit 1 dan assets that comprise electricity generating facilities
Unit 2 (“Jaminan Aset”), jaminan fidusia atas hasil located at Unit 1 and Unit 2 (the “Asset Collateral”),
asuransi yang terkait dengan Jaminan Aset, beban atas fiduciary security over insurance proceeds related to the
rekening terkait utang dan gadai atas Onshore Rekening Asset Collateral, a charge over the debt related
Korporasi dan Pajak dan biaya saham yang akan accounts and a pledge over the Onshore Corporate and
dilaksanakan oleh SEGPL atas seluruh sahamnya saat Tax Account and a share charge to be executed by
ini dan di masa mendatang di SEGWWL dan setiap SEGPL over its entire present and future shares in
perjanjian lindung nilai yang dibuat oleh SEGWWL atau SEGWWL and any hedging agreement entered into by
salah satu anak perusahaannya. Rekening Pendapatan SEGWWL or any of its subsidiaries. Revenue and
dan Operasi, Rekening Distribusi dan Rekening Operating Account, the Distribution Account and the
Perusahaan dan Pajak Darat diklasifikasikan sebagai Onshore Corporate and Tax Account are classified as
saldo kas dan bank dalam laporan posisi keuangan cash and bank balances in the consolidated statement
konsolidasian. of financial position.
89
Page 92
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Notes 2033 berisi batasan-batasan tertentu termasuk The 2033 Notes contain certain covenants including
rasio keuangan, pembatasan utang tambahan, financial ratios, limitation on additional indebtedness,
pembatasan penjualan aset, pembatasan hak gadai, limitation on asset sales, limitation on liens, limitation on
pembatasan transaksi dengan afiliasi, pembatasan transactions with affiliates, limitation on equity
distribusi ekuitas, pembatasan kegiatan bisnis yang distributions, limitation on different business activities,
berbeda, pembatasan amendemen dokumen proyek limitation on amendments to key project documents and
utama dan pembatasan penerbitan modal. limitation on issuances of capital stock.
Pada tanggal 30 Juni 2025, Notes 2033 mendapatkan As at 30 June 2025, the 2033 Notes are rated
peringkat “BB-” dari Fitch dan “Ba3” dari Moody’s “BB-” by Fitch and “Ba3” by Moody’s with a positive
dengan prospek yang stabil. Peringkat tersebut outlook. The rating reflects the rating agencies’
menunjukkan penilaian agen pemeringkat bahwa assessments that SEGWWL. will effectively execute its
SEGWWL akan secara efektif menjalankan strategi growth strategy while continuing to adhere to
pertumbuhan sambil terus mematuhi kebijakan conservative financial policies.
keuangan yang konservatif.
Notes 2029 dan Notes 2038 2029 Notes and 2038 Notes
Pada tanggal 14 Oktober 2020, SEGSL dan SEGD-II On 14 October 2020, SEGSL and SEGD-II (together, the
(bersama-sama, “Penerbit Bersama”) menerbitkan “Co-Issuers”) issued an aggregate principal amount of
jumlah pokok sebesar AS$320.000 3,25% senior US$320,000 3.25% senior secured notes due in 2029 (the
secured notes yang akan jatuh tempo pada tahun 2029 “2029 Notes”) and US$790,000 4.85% senior secured
(“Notes 2029”) dan AS$790.000 4,85% senior secured notes due in 2038 (the “2038 Notes”). The 2029 Notes
notes jatuh tempo tahun 2038 (“Notes 2038”). Notes bear interest at a fixed rate of 3.25% per annum. Interest
2029 dikenakan bunga tetap sebesar 3,25% per tahun. on the 2029 Notes is payable on 14 April and 14 October
Bunga atas Notes 2029 dibayarkan pada tanggal of each year, beginning on 14 April 2021. The 2029 Notes
14 April dan 14 Oktober setiap tahun, dimulai pada will mature on 14 April 2029. The 2038 Notes bear interest
tanggal 14 April 2021. Notes 2029 akan jatuh tempo at a fixed rate of 4.85% per annum. Interest on the 2038
pada tanggal 14 April 2029. Notes 2038 dikenakan Notes is payable on 14 April and 14 October of each year,
tingkat bunga tetap sebesar 4,85% per tahun. Bunga beginning on 14 April 2021. The 2038 Notes will mature on
atas Notes 2038 dibayarkan pada tanggal 14 April dan 14 October 2038.
14 Oktober setiap tahun, dimulai pada tanggal 14 April
2021. Notes 2038 akan jatuh tempo pada tanggal
14 Oktober 2038.
Notes 2029 2029 Notes
Berdasarkan Notes 2029, jadwal pembayaran adalah Based on the 2029 Notes’ Indenture, the repayment
sebagai berikut: schedule is as follows:
Persentase atas nilai/
Tanggal pembayaran Percentage of principal amount Payment date
14 Oktober 2021 0.63% 14 October 2021
14 April 2022 4.69% 14 April 2022
14 Oktober 2022 3.13% 14 October 2022
14 April 2023 6.25% 14 April 2023
14 Oktober 2023 5.63% 14 October 2023
14 April 2024 5.31% 14 April 2024
14 Oktober 2024 8.44% 14 October 2024
14 April 2025 7.50% 14 April 2025
14 Oktober 2025 4.69% 14 October 2025
14 April 2026 4.69% 14 April 2026
14 Oktober 2026 8.75% 14 October 2026
14 April 2027 9.38% 14 April 2027
14 Oktober 2027 12.50% 14 October 2027
14 April 2028 8.44% 14 April 2028
14 Oktober 2028 5.47% 14 October 2028
14 April 2029 Semua jumlah pokok yang tersisa/ 14 April 2029
All remaining outstanding principal amounts
90
Page 93
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Setiap saat dan dari waktu ke waktu pada atau setelah At any time and from time to time on or after 14 April 2024,
14 April 2024, setiap Obligor (Obligor mengacu pada any Obligor (Obligor refers to SEG-SD B.V. and its
SEG-SD B.V. dan anak perusahaannya) dapat, atas subsidiaries) may at its option redeem the Notes, in whole
pilihannya sendiri, menebus Notes, seluruhnya atau or in part, at a redemption price equal to the percentage
sebagian, dengan harga penebusan yang setara of the principal amount set out below plus accrued and
dengan persentase dari jumlah pokok yang tercantum unpaid interest to the redemption date if redeemed during
di bawah ditambah bunga yang masih harus dibayar the 12-month period beginning on 14 April of the years
dan bunga yang belum dibayar pada tanggal indicated below.
penebusan jika ditebus selama periode 12 bulan yang
dimulai pada tanggal 14 April dari tahun-tahun yang
ditunjukkan di bawah ini.
Tahun/Year Persentase/ Percentage
2024 101.63%
2025 100.81%
2026 dan seterusnya/and thereafter 100.00%
Setiap saat dan dari waktu ke waktu sebelum At any time and from time to time prior to 14 April 2024,
14 April 2024, setiap Obligor dapat, atas pilihannya, any Obligor may, at its option, redeem the Notes, in whole
menebus Notes, seluruhnya atau sebagian, dengan or in part, at a redemption price equal to the greater of the
harga penebusan yang setara dengan yang lebih besar following:
dari yang berikut ini:
(1) 100% dari jumlah pokok Notes tersebut yang akan (1) 100% of the principal amount of such Notes to be
ditebus pada tanggal penebusan; atau redeemed as at the redemption date; or
(2) jumlah nilai sekarang dari setiap sisa pembayaran (2) the sum of the present value of each remaining
pokok dan bunga yang terjadwal atas Notes yang scheduled payment of principal and interest on the
akan ditebus (tidak termasuk bunga yang masih Notes to be redeemed (exclusive of interest accrued
harus dibayar dan belum dibayar sampai (namun and unpaid to (but not including) the redemption date)
tidak termasuk) tanggal penebusan) (dengan (assuming the due payment of all Notes Amortisation
asumsi pembayaran jatuh tempo dari semua Jumlah Amounts in accordance with the amortisation profile
Amortisasi Notes sesuai dengan profil amortisasi set out in the schedule above and no other
yang ditetapkan dalam jadwal di atas dan tidak ada subsequent redemptions) discounted to the
penebusan berikutnya) didiskontokan ke tanggal redemption date on a semi-annual basis (assuming
penebusan secara setengah tahunan (dengan a 360-day year consisting of twelve 30-day months)
asumsi satu tahun 360 hari terdiri dari dua belas at the Treasury Rate plus 50 basis points.
30-hari bulan) dengan Tingkat Perbendaharaan
ditambah 50 basis poin.
Notes 2038 2038 Notes
Berdasarkan Indenture Notes 2038, jadwal Based on the 2038 Notes’ Indenture, the repayment
pembayaran adalah sebagai berikut: schedule is as follows:
Persentase atas nilai pokok/
Tanggal pembayaran Percentage of principal amount Payment date
14 Oktober 2029 2.53% 14 October 2029
14 April 2030 3.04% 14 April 2030
14 Oktober 2030 5.19% 14 October 2030
14 April 2031 5.06% 14 April 2031
14 Oktober 2031 4.56% 14 October 2031
14 April 2032 2.53% 14 April 2032
14 Oktober 2032 4.75% 14 October 2032
14 April 2033 5.06% 14 April 2033
14 Oktober 2033 6.33% 14 October 2033
14 April 2034 6.33% 14 April 2034
14 Oktober 2034 4.43% 14 October 2034
14 April 2035 3.54% 14 April 2035
14 Oktober 2035 5.44% 14 October 2035
14 April 2036 5.70% 14 April 2036
14 Oktober 2036 7.60% 14 October 2036
14 April 2037 8.86% 14 April 2037
14 Oktober 2037 6.33% 14 October 2037
14 April 2038 5.06% 14 April 2038
Semua jumlah pokok yang tersisa/
14 Oktober 2038 All remaining outstanding principal amounts 14 October 2038
91
Page 94
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Setiap saat dan dari waktu ke waktu pada atau setelah At any time and from time to time on or after
tanggal 14 Oktober 2029, setiap Obligor dapat, atas 14 October 2029, any Obligor may, at its option,
pilihannya, menebus Notes, seluruhnya atau sebagian, redeem the Notes, in whole or in part, at a redemption
dengan harga penebusan yang setara dengan price equal to the percentage of the principal amount
persentase jumlah pokok Notes yang akan ditebus di of the Notes to be redeemed set out below plus
bawah ini ditambah bunga yang masih harus dibayar accrued and unpaid interest to the redemption date if
dan bunga yang belum dibayar pada tanggal redeemed during the 12-month period beginning on 14
penebusan jika ditebus selama periode 12 bulan yang October of the years indicated below:
dimulai pada tanggal 14 Oktober tahun-tahun yang
ditunjukkan di bawah ini:
Tahun/Year Persentase/Percentage
2029 102.43%
2030 101.62%
2031 100.81%
2032 dan seterusnya/and thereafter 100.00%
Setiap saat dan dari waktu ke waktu sebelum tanggal At any time and from time to time prior to 14 October
14 Oktober 2029, setiap Obligor dapat, atas pilihannya 2029, any Obligor may, at its option, redeem the Notes,
sendiri, menebus Notes, seluruhnya atau sebagian, in whole or in part, at a redemption price equal to the
dengan harga penebusan yang setara dengan yang greater of the following:
lebih besar dari berikut ini:
(1) 100% dari jumlah pokok Notes tersebut yang akan (1) 100% of the principal amount of such Notes to be
ditebus pada tanggal penebusan; dan redeemed as at the redemption date; and
(2) jumlah nilai sekarang dari setiap sisa pembayaran (2) the sum of the present value of each remaining
pokok dan bunga yang dijadwalkan pada Notes scheduled payment of principal and interest on the
yang akan ditebus (tidak termasuk bunga yang Notes to be redeemed (exclusive of interest
masih harus dibayar dan belum dibayar sampai accrued and unpaid to (but not including) the
(namun tidak termasuk) tanggal penebusan, dan redemption date, and assuming the due payment
dengan asumsi pembayaran jatuh tempo dari of all Notes Amortisation Amounts in accordance
semua Jumlah Amortisasi Notes sesuai dengan with the amortisation profile set out in the schedule
profil amortisasi yang ditetapkan dalam skedul di above and no other subsequent redemptions)
atas dan tidak ada penebusan berikutnya) yang discounted to the redemption date on a semi-
didiskontokan pada tanggal penebusan secara annual basis (assuming a 360-day year consisting
setengah tahunan (dengan asumsi satu tahun 360 of twelve 30-day months) at the Treasury Rate
hari terdiri dari dua belas bulan 30 hari) dengan plus 50 basis points.
Tingkat Perbendaharaan ditambah 50 basis poin.
Manajemen berpendapat bahwa pelaksanaan opsi Management is of the opinion that exercising the
pembayaran di muka sebelum 14 April 2024 untuk prepayment options prior to 14 April 2024 for the 2029
Notes 2029 dan 14 Oktober 2029 untuk Notes 2038 Notes and 14 October 2029 for the 2038 Notes is not
tidak menguntungkan secara ekonomi bagi Grup economically beneficial to the Group as the
karena biaya denda pembayaran di muka secara prepayment penalty cost is significantly higher than the
signifikan lebih tinggi daripada penghematan suku interest rate saving if it is being refinanced, therefore,
bunga jika dibiayai kembali, oleh karena itu, manajemen management does not intend to exercise such option
tidak bermaksud untuk menggunakan opsi tersebut in the near future. Management is also of the opinion
dalam waktu dekat. Manajemen juga berpendapat that the prepayment options on or after 14 April 2024
bahwa opsi pembayaran di muka pada atau setelah for the 2029 Notes and 14 October 2029 for the 2038
14 April 2024 untuk Notes 2029 dan 14 Oktober 2029 Notes only reimburse the holders of the 2029 Notes
untuk Notes 2038 hanya mengganti uang pemegang and 2038 Notes for an amount up to the approximate
Notes 2029 dan Notes 2038 dengan jumlah sampai present value of lost interest for the remaining term of
dengan perkiraan nilai sekarang dari bunga yang hilang the 2029 Notes and 2038 Notes with an insignificant
untuk sisa jangka waktu Notes 2029 dan Notes 2038 differential and therefore the fair value of the
dengan perbedaan yang tidak signifikan dan karenanya prepayment options is not significant.
nilai wajar opsi pembayaran di muka tidak signifikan.
Notes 2029 dan Notes 2038 dijamin dengan agunan The 2029 Notes and 2038 Notes are secured by
seperti pengalihan pinjaman antar perusahaan, collateral including the assignment of intercompany
pengalihan hak kontrak, beban rekening luar negeri, loans, assignment of contract rights, offshore account
gadai rekening dalam negeri, gadai saham SEG-SD charges, onshore account pledges, share pledges of
B.V., SEGSL, SEGSPL, SEGD-I, SEGD-II, PT DGI, dan SEG-SD B.V., SEGSL, SEGSPL, SEGD-I, SEGD-II,
jaminan fidusia atas klaim asuransi. Notes 2029 dan PT DGI, and fiduciary security over the insurance
Notes 2038 memuat ketentuan-ketentuan tertentu claims. The 2029 Notes and 2038 Notes contain certain
seperti rasio keuangan, pembatasan distribusi ekuitas, covenants such as financial ratios, the limitation on
pembatasan penjualan aset, pembatasan transaksi equity distributions, limitation on asset sales, limitation
dengan afiliasi, pembatasan gadai, pembatasan on transactions with affiliates, limitation on liens,
kegiatan usaha obligor, pembatasan tentang penjualan limitation on business activities of the obligors,
dan penerbitan modal saham di anak perusahaan yang limitation on sales and issues of capital stock in
dibatasi, pembatasan amendemen dokumen proyek restricted subsidiaries, limitation on amendments to
utama dan pembatasan penerbitan jaminan oleh anak key project documents and limitation on issues of
perusahaan yang dibatasi. guarantees by restricted subsidiaries.
92
Page 95
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Pada tanggal 30 Juni 2025, Notes 2029 dan Notes 2038 As at 30 June 2025, the 2029 Notes and the 2038
mendapatkan peringkat “BBB-” dari Fitch dan “Baa3” Notes are rated “BBB-” by Fitch and “Baa3” by Moody’s
dari Moody’s, keduanya dengan prospek yang stabil. both with a positive outlook. The ratings reflect the
Peringkat tersebut menunjukkan penilaian agen rating agencies’ assessments that SEG-SD B.V. will
pemeringkat bahwa SEG-SD B.V. akan secara efektif effectively execute its growth strategy while continuing
menjalankan strategi pertumbuhan sambil terus to adhere to conservative financial policies.
mematuhi kebijakan keuangan yang konservatif.
Utang bank Bank loans
(i) Utang Bank SEGHPL (i) SEGHPL Bank Loan
Pada tanggal 11 Desember 2022, SEGHPL On 11 December 2022, SEGHPL entered into a
menandatangani perjanjian fasilitas pinjaman secured term loan facility agreement with Bangkok
berjangka dengan jaminan dengan Bangkok Bank Bank Public Company Limited for committed
Public Company Limited untuk komitmen fasilitas, facilities – Facility A and Facility B amounting to
Fasilitas A dan Fasilitas B masing-masing sebesar US$110,000 and US$545,000, respectively (the
AS$110.000 dan AS$545.000, masing-masing “SEGHPL Bank Loan”). Facility A and Facility B
(“Utang Bank SEGHPL”). Fasilitas A dan Fasilitas B have maturity dates of six months and 60 months,
memiliki jatuh tempo masing-masing enam bulan dan respectively, after the utilisation date.
60 bulan setelah tanggal penggunaan.
Pemanfaatan pertama Utang Bank SEGHPL The SEGHPL Bank Loan first utilisation was made
dilakukan pada tanggal 13 Desember 2022, sebesar on 13 December 2022, amounting to US$160,500,
AS$160.500, yang terdiri dari penggunaan penuh dari which consisted of full utilisation of Facility A of
Fasilitas A sebesar AS$110.000 dan pemanfaatan US$110,000 and partial utilisation of Facility B of
sebagian Fasilitas B sebesar AS$50.500. Total kas US$50,500. The total cash received was
yang diterima adalah AS$160.000 setelah US$160,000 after taking into account the financing
memperhitungkan biaya pembiayaan sebesar costs of US$500. The proceeds were used to
AS$500. Hasil tersebut digunakan untuk membiayai finance the acquisition of the 50% interest in DGA
akuisisi 50% kepemilikan di DGA SEG B.V.. SEGHPL SEG B.V.. SEGHPL has repaid the US$110,000
telah melunasi penarikan pada Fasilitas A sebesar drawdown on Facility A on
AS$110.000, pada tanggal 27 December 2022.
27 Desember 2022.
Pemanfaatan kedua pinjaman bank SEGHPL The SEGHPL Bank Loan second utilisation was
dilakukan pada tanggal 20 Desember 2022 sebesar made on 20 December 2022 amounting to
AS$489.950. Total kas yang diterima adalah US$489,950. The total cash received was
AS$485.000 setelah memperhitungkan biaya US$485,000 after taking into account the financing
pembiayaan sebesar AS$4.950. Dana tersebut costs of US$4,950. The proceeds were used to
digunakan untuk membiayai akuisisi saham Phoenix finance the acquisition of Phoenix Power B.V.’s
Power B.V. di SEGPL dan SEGNBV. shares in SEGPL and SEGNBV.
Pemanfaatan ketiga pinjaman bank SEGHPL The SEGHPL Bank Loan third utilisation was made
dilakukan pada tanggal 21 Februari 2023 sebesar on 21 February 2023 amounting to US$4,550.
AS$4.550.
Pada tanggal 8 November 2023, SEGHPL melakukan On 8 November 2023, SEGHPL made a principal
pembayaran di muka pokok pinjaman sebesar prepayment of US$90,000. As a result of such
AS$90.000. Akibat pembayaran di muka tersebut, prepayment, the breaking costs for prepayment of
breaking costs pelunasan di muka pinjaman bank the Bank Loan amounting to US$391 has been
sebesar AS$391 telah dicatat sebagai bagian biaya recorded as part of finance costs in profit or loss for
keuangan dalam laba rugi untuk tahun yang berakhir the year ended 31 December 2023.
pada tanggal 31 Desember 2023.
Perjanjian fasilitas dikenakan bunga mengambang (i) The facility agreements bear floating interest (i) at
sebesar margin yang berlaku di atas LIBOR untuk applicable margin over LIBOR for the period until 30
periode sampai dengan 30 Juni 2023 atau ketika June 2023 or until LIBOR is no longer available,
LIBOR tidak tersedia, mana yang lebih dahulu; dan (ii) whichever is earlier; and (ii) applicable margin plus
margin yang berlaku ditambah spread kredit 0.42826% credit spread over the secured overnight
0,42826% ditambah secured overnight financing rate financing rate (“SOFR”) as published by CME Group
(“SOFR”) sebagaimana diterbitkan oleh CME Group Benchmark Administration Limited. The interest is
Benchmark Administration Limited. Bunga terutang payable on a semi-annual basis.
setiap semester.
93
Page 96
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Pinjaman bank SEGHPL tersebut dijamin dengan The SEGHPL Bank Loan is secured by several items
beberapa agunan berupa saham SEGPL yang of collateral including the acquired SEGPL shares,
dibeli, saham SEGNBV yang dibeli, saham DGA acquired SEGNBV shares, acquired DGA SEG B.V.
SEG B.V. yang dibeli, dan saham tertentu Barito shares, and certain shares of Barito Pacific and
Pacific dan PT Chandra Asri Petrochemical Tbk. PT Chandra Asri Petrochemical Tbk. (related party),
(pihak berelasi), dan perjanjian jaminan bisnis atas and a business security agreement over the debt
rekening cadangan pelunasan utang. service reserve account.
Pada 2 September 2024, SEGHPL On 2 September 2024, SEGHPL amended the loan
mengamandemen pinjaman dengan Bangkok with Bangkok Bank Public Company Limited as
Bank Public Company Limited sebagai berikut: follow:
a. Pada dan setelah Amendment and a. On and after the Amendment and Restatement
Restatement Agreement Effective Date, Agreement Effective Date, margin per annum is
margin per tahun dikurangi. reduced.
b. SEGHPL harus membayarkan pinjaman b. SEGHPL shall repay the Facility B Loans in
Fasilitas B secara cicilan dengan membayar instalments by repaying on each Repayment
pada setiap Tanggal Pelunasan sesuai dengan Date an amount which reduces the total
nilai dan jadwal yang ditentukan sebagai outstanding Facility B Loans by the amount set
berikut: out opposite that Repayment Date below:
Jadwal pelunasan Fasilitas B adalah sebagai The repayment schedule for Facility B is as follows:
berikut:
Cicilan Pembayaran/
Tanggal pembayaran Repayment installment Payment date
5 Januari 2025 US$11,380 5 January 2025
5 Juli 2025 US$11,380 5 July 2025
5 Januari 2026 US$18,200 5 January 2026
5 Juli 2026 US$18,200 5 July 2026
5 Januari 2027 US$20,480 5 January 2027
5 Juli 2027 US$20,480 5 July 2027
5 Januari 2028 US$20,480 5 January 2028
5 Juli 2028 US$20,480 5 July 2028
5 Januari 2029 US$20,480 5 January 2029
Tanggal jatuh tempo akhir US$293,440 Final maturity date
Perjanjian pinjaman yang telah diamandemen The amended loan agreement was effective on
efektif pada tanggal 4 September 2024. 4 September 2024.
Pada bulan Desember 2024 dan Januari 2025, On December 2024 and January 2025, there are
terdapat pelunasan pinjaman lebih awal sebesar early repayment loan amounting to US$19,000 and
AS$19.000 dan AS$5.000, sehingga jadwal US$5,000 respectively, thus the repayment
pelunasan menjadi sebagai berikut: schedules becomes as follow:
Cicilan Pembayaran/
Tanggal pembayaran Repayment installment Payment date
5 Januari 2025 US$5,000 5 January 2025
5 Juli 2025 - 5 July 2025
5 Januari 2026 US$16,960 5 January 2026
5 Juli 2026 US$18,200 5 July 2026
5 Januari 2027 US$20,480 5 January 2027
5 Juli 2027 US$20,480 5 July 2027
5 Januari 2028 US$20,480 5 January 2028
5 Juli 2028 US$20,480 5 July 2028
5 Januari 2029 US$20,480 5 January 2029
Tanggal jatuh tempo akhir US$293,440 Final maturity date
94
Page 97
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Akibat pembayaran di muka tersebut, breaking costs As a result of such prepayment, the breaking costs
pelunasan di muka pinjaman bank sebesar AS$63 for prepayment of the Bank Loan amounting to
telah dicatat sebagai bagian biaya keuangan dalam US$63 has been recorded as part of finance costs in
laba rugi untuk tahun yang berakhir pada tanggal profit or loss for the year ended 31 December 2024.
31 Desember 2024.
Pada tanggal 22 November 2024, SEGHPL On 22 November 2024, SEGHPL entered into
menandatangani kontrak swap suku bunga dengan interest rate swap contract with BBL in order to
BBL untuk melindungi volatilitas biaya bunganya protect its interest cost volatility from the
dari pinjaman suku bunga mengambang dalam dolar US$ floating rate loan. The following interest rate
AS. Kontrak swap suku bunga berikut adalah swap contract is as follows:
sebagai berikut:
Counterparty Notional Fixed rate Period
BBL US$221,810,000 4.00% Jan 6, 2025 – Jul 5, 2029
Semua instrumen derivatif memenuhi syarat All of the derivative financial instruments qualified as
sebagai arus kas lindung nilai mulai tanggal 30 Juni cash flow hedges as at 30 June 2025. Fair value loss
2025. Penurunan nilai wajar pada instrumen on hedging instruments designated as cash flow
hedging ditetapkan sebagai arus kas lindung untuk hedges for the year ended 30 June 2025 amounting
periode 30 Juni 2025 bernilai AS$3.742 (setelah to US$3,742 (net of tax) is presented in other
dikurangi pajak) disajikan sebagai penghasilan comprehensive income as other comprehensive
komprehensif lain. income.
Pada tanggal 30 Juni 2025, nilai wajar estimasi As at 30 June 2025, the estimated fair value of these
kontrak ini adalah AS$3.742 dan tidak contracts was US$3,742 and was unfavourable to
menguntungkan untuk SEGHPL. SEGHPL.
Pinjaman tersebut mengandung batasan-batasan The loan contains certain covenants including
tertentu termasuk batasan keuangan (efektif sejak financial covenants (effective from 30 June 2023
30 Juni 2023 sampai tanggal jatuh tempo), batasan until the maturity date), limitation on acquisitions,
akuisisi, batasan utang, batasan pelepasan aset, limitation on indebtedness, limitation on asset
batasan distribusi ekuitas dan batasan pelepasan disposal, limitation on equity distributions and
saham gadai. limitation on disposal of pledged shares.
(ii) Utang Bank Perusahaan (ii) The Company’s Bank Loan
Pada tanggal 31 Oktober 2023, Perusahaan On 31 October 2023, the Company entered into a
menandatangani perjanjian committed revolving three-year committed revolving credit facility
credit facility untuk tiga tahun sebesar AS$50.000 agreement of US$50,000 with PT DBS Indonesia.
dengan PT DBS Indonesia. Fasilitas ini memiliki The facility has a maturity date of 12 months after
jatuh tempo 12 bulan setelah tanggal penarikan. the drawdown date.
Pada tanggal 2 November 2023, Perusahaan telah On 2 November 2023, the Company made a
melakukan penarikan sebesar AS$39.000 yang drawdown of US$39,000 to finance the Company’s
digunakan untuk membiayai tujuan umum general purposes. This facility has been fully repaid
Perusahaan. Fasilitas ini telah dilunasi penuh pada on November 2024.
bulan November 2024.
Pada tanggal 2 November 2024, Perusahaan telah On 2 November 2024, the Company made a
melakukan penarikan sebesar AS$39.000 yang drawdown of US$39,000 to finance the Company’s
digunakan untuk membiayai tujuan umum general purposes.
Perusahaan.
Pada tanggal 24 Juni 2024, Perusahaan On 24 June 2024, the Company entered into a three-
menandatangani perjanjian committed revolving year committed revolving credit facility agreement of
credit facility untuk tiga tahun sebesar IDR300,000,000,000 – full amount, with PT DBS
IDR300.000.000.000 – nilai penuh, dengan PT DBS Indonesia. The facility has a maturity date of 12
Indonesia. Fasilitas ini memiliki jatuh tempo 12 bulan months after the drawdown date.
setelah tanggal penarikan.
Pada tanggal 26 Juni 2024, Perusahaan telah On 26 June 2024, the Company made a drawdown
melakukan penarikan sebesar IDR272.070.250.000 of IDR272,070,250,000 – full amount, to finance the
– nilai penuh, yang digunakan untuk membiayai Company’s general purposes. This facility has been
tujuan umum Perusahaan. Fasilitas ini telah dilunasi fully repaid on 26 June 2025.
penuh pada bulan 26 Juni 2025.
95
Page 98
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Pada tanggal 26 Juni 2025, Perusahaan telah On 26 June 2025, the Company made a drawdown
melakukan penarikan sebesar IDR272.070.250.000 of IDR272,070,250,000 - full amount to finance the
– nilai penuh, yang digunakan untuk membiayai Company’s general purposes.
tujuan umum Perusahaan.
Pada tanggal 13 Desember 2024, Perusahaan On 13 December 2024, the Company entered into a
menandatangani perjanjian committed revolving three-year committed revolving credit facility
credit facility untuk tiga tahun sebesar agreement of IDR507,000,000,000 - full amount with
Rp507.000.000.000 - nilai penuh dengan PT DBS PT DBS Indonesia. The facility has a maturity date
Indonesia. Fasilitas ini memiliki jatuh tempo 12 bulan of 12 months after the drawdown date.
setelah tanggal penarikan.
Pada tanggal 16 Desember 2024, Perusahaan On 16 December 2024, the Company made a
melakukan penarikan sebesar Rp506.158.500.000 - drawdown of IDR506,158,500,000 - full amount to
nilai penuh untuk membiayai keperluan umum finance the Company’s general purposes.
Perusahaan.
Perjanjian-perjanjian fasilitas diatas ini memberikan The facility agreements above bears fixed interest at
bunga tetap sebesar 0,6% margin di atas tingkat 0.6% margin over the time deposit interest rate used
bunga deposito berjangka yang digunakan sebagai as collateral for this facility agreement. The interest
jaminan atas perjanjian fasilitas ini. Bunga terutang is payable at the maturity date of the facility.
pada saat jatuh tempo fasilitas.
(iii) Utang Bank BWE (iii) BWE’s Bank Loan
Pada tanggal 28 Maret 2024, PT Barito Wind Energy On 28 March 2024, PT Barito Wind Energy (“BWE”),
(“BWE”), entitas anak yang 99,99% sahamnya a 99.99% controlled subsidiary of the Company, has
dimiliki oleh Perseroan, telah menandatangani signed Facilities Agreement with PT Bank Negara
Perjanjian Fasilitas dengan PT Bank Negara Indonesia (Persero) Tbk (“BNI”) for committed
Indonesia (Persero) Tbk (“BNI”) untuk komitmen facilities – Tranche A and Tranche B. Tranche A
fasilitas Tahap A dan Tahap B. Fasilitas Tahap A Facility is the agreed IDR equivalent of USD 70,000
yang disetujui adalah jumlah rupiah yang and Tranche B Facility is USD 40,000 respectively
disetarakan dengan USD 70.000 dan Fasilitas (the “BWE Bank Loan”).
Tahap B setara dengan USD 40.000 (“Pinjaman
Bank BWE”).
Fasilitas Tahap A dan B memiliki tanggal jatuh Tranche A and B have maturity dates of 120 months
tempo 120 bulan (dapat diperpanjang) dan 6 bulan, (can be extended) and 6 months respectively, after
setelah tanggal penggunaan dana awal. the initial utilization date.
Pinjaman dari Bank BWE dipergunakan untuk: The proceeds of the BWE Bank Loan will be used as
follows:
1. Fasilitas Tahap A untuk mendanai pembayaran 1. Tranche A Facility is to fund the acquisition
akuisisi PT UPC Sidrap Bayu Energi (“SBE”) payment of PT UPC Sidrap Bayu Energi
dan PT Barito Wind Operation and Maintenance (“SBE”) and PT Barito Wind Operation and
Indonesia (“OMI”). Maintenance Indonesia (“OMI”).
2. Fasilitas Tahap B untuk mendanai keperluan 2. Tranche B Facility is to fund the general
umum BWE. corporate purposes of BWE.
Penggunaan dana pertama dari Pinjaman Bank The BWE Bank Loan first utilisation was made on 30
BWE dilakukan pada tanggal 30 Maret 2024 March 2024, amounting to IDR1,114,260,000,000 –
sebesar IDR1.114.260.000.000 – nilai penuh, yang full amount, which consisted of full utilisation of
merupakan pemanfaatan penuh dari Pinjaman Bank Tranche A.
Tahap A.
Penggunaan dana kedua dari Pinjaman Bank BWE The BWE Bank Loan second utilisation was made
dilakukan pada tanggal 1 April 2024 sebesar on 1 April 2024, amounting to AS$29,000. On
AS$29.000. Pada tanggal 14 Juni 2024, Pinjaman 14 June 2024, tranche B has been fully repaid.
Bank Tahap B telah sepenuhnya dilunasi.
Pinjaman Bank BWE dikenakan bunga BWE Bank Loan bear floating interest for each
mengambang untuk setiap Periode Pembayaran Interest Period is the percentage rate per annum
Bunga dengan tingkat persentase per tahun, yaitu: which is:
a) Untuk Pinjaman Tahap A, jumlah dari (i) margin a) in relation to a Tranche A Loan, the aggregate
yang berlaku dan (ii) JIBOR untuk Periode of (i) the applicable Margin and (ii) JIBOR for
Pembayaran Bunga tersebut, bunga terutang that Interest Period, the interest is payable on
setiap semester; dan a semi-annual basis; and
96
Page 99
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
b) untuk Pinjaman Tahap B, sebesar 0,6%, bunga b) in relation to a Tranche B Loan, 0.6%, the
terutang pada saat pinjaman jatuh tempo. interest is payable at the end of maturity date.
Pinjaman Bank BWE dijamin dengan beberapa The BWE Bank Loan is secured by several items of
agunan termasuk saham-saham OMI, dan gadai collateral including the shares of OMI, and pledge of
atas rekening BWE dan OMI. account of BWE and OMI.
Pinjaman ini mengandung batasan-batasan rasio The loan contains certain financial ratios covenants
finansial tertentu (berlaku sejak tanggal (effective from 31 December 2024 until the maturity
31 Desember 2024 sampai dengan tanggal jatuh date)
tempo)
(iv) Utang Bank SBE (iv) SBE’s Bank Loan
SBE menandatangani kesepakatan pinjaman SBE entered into a loan agreement for the purpose
dengan tujuan pengembangan Projek di Sidrap of developing the Project in Sidrap for an amount not
dengan jumlah yang tidak melebihi AS$120.000. exceeding US$120,000.
Berdasarkan kesepakatan pinjaman yang telah Based on the amended and restated loan
diamandemen dan dinyatakan ulang (“A&R Loan agreement (“A&R Loan Agreement”), the loan
Agreement”), syarat pembayaran pinjaman secara repayment terms were semi-annually until
setengah tahunan sampai 15 Januari 2034 dengan 15 January 2034 with interest charged at the SOFR
bunga yang dibebankan menggunakan SOFR plus margin per annum (2023: LIBOR plus margin).
ditambah margin per tahun (2023: LIBOR ditambah SBE is also required to enter into hedging
margin). SBE juga diwajibkan untuk melakukan arrangements (interest rate swaps) for a notional
kesepakatan hedging (pertukaran suku bunga) amounts at the minimum 80% and does not exceed
untuk nilai notional minimal pada 80% dan tidak 100% of the principal amount.
melebihi 100% dari nilai pokok.
Sesuai dengan kesepakatan pinjaman, utang ini In accordance with the loan agreement, this
menerapkan batasan keuangan tertentu dan borrowing imposes certain financial covenants and
dijaminkan dengan aset tetap SBE, asset bergerak, is collateralised by SBE’s property, plant and
piutang, asuransi, modal saham, dan saham yang equipment, moveable assets, receivables,
dimiliki oleh masing-masing BWE dan PT Barito insurance, share capital, and shares owned by each
Mitra Investama. of BWE and PT Barito Mitra Investama.
SBE menerapkan hedge accounting pada SBE adopted hedge accounting on 15 January 2020
15 Januari 2020 dan 16 Maret 2020 – tanggal and 16 March 2020 - the hedge inception dates for
berlakunya lindung nilai untuk instrumen keuangan its derivative financial instruments against the SBE’s
derivatif terhadap pemaparan SBE terhadap resiko exposure to interest rate risk on its long-term loan.
suku bunga atas pinjaman jangka panjangnya. SBE SBE formally documents the relationship between
mendokumentasikan secara formal hubungan the hedging instrument and the hedged item,
antara instrumen hedging dan objek lindung nilai, including the risk management objectives, the
meliputi tujuan manajemen resiko, strategi dalam strategy in undertaking the hedge transaction and
melaksanakan transaksi lindung nilai dan resiko the hedged risk, together with the methods that will
yang dilindung nilai, bersama dengan metode yang be used to assess the effectiveness of the hedging
akan digunakan untuk menilai keefektifan dari relationship.
hubungan lindung nilai.
Semua instrumen keuangan derivatif memenuhi All of the derivative financial instruments qualified as
syarat sebagai arus kas lindung nilai pada tanggal cash flow hedges as of 30 June 2025. Fair value loss
30 Juni 2025. Penurunan nilai wajar pada instrumen on hedging instruments designated as cash flow
hedging ditetapkan sebagai arus kas lindung untuk hedges for the year ended 30 June 2025 amounting
periode 30 Juni 2025 bernilai AS$767 (setelah to US$767 (net of tax) is presented as other
dikurangi pajak) disajikan sebagai penghasilan comprehensive income.
komprehensif lain.
Perjanjian pertukaran suku bunga Perusahaan Interest swap contracts The Company entered into
menandatangani perjanjan pertukaran suku bunga interest rate swap contracts with SMBC in order to
dengan SMBC untuk melindungi volatilitas beban protect its interest cost volatility from the US$
bunga dari suku bunga pinjaman floating AS$. floating rate loan. The following interest rate swap
Berikut rincian perjanjian pertukaran suku bunga contracts were outstanding as at 30 June 2025:
yang tersisa pada 30 Juni 2025:
Counterparty Notional Fixed rate Period
SMBC 72,944 2.036% 15 January 2020 – 15 January 2034
SMBC 8,105 1.109% 16 March 2020 – 15 January 2034
97
Page 100
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Pada tanggal 30 Juni 2025, nilai wajar estimasi As of 30 June 2025, the estimated fair value of these
kontrak ini adalah AS$9.925 dan menguntungkan contracts was US$9,925 and was favourable to
untuk SBE. SBE.
(v) Utang Bank SEGDS (v) SEGDS’s Bank Loan
Pada tanggal 7 November 2024, PT SEGDS (Star On 7 November 2024, PT SEGDS (Star Energy
Energy Geothermal Drilling Services) telah Geothermal Drilling Services) has signed Facilities
menandatangani Perjanjian Fasilitas dengan BCA Agreement with BCA for Multiples Credit Facilities
untuk Fasilitas Kredit Berganda dan fasilitas LC. and LC facilities.
Fasilitas kredit berganda dengan nilai yang Multiples credit facilities with the agreed
disepakati sebesar Rp374.000.000.000 – nilai Rp374,000,000,000 – full amount or equivalent
penuh atau setara dengan AS$22.000 memiliki US$22,000 have maximum maturity dates of 31
tanggal jatuh tempo maksimum 31 Desember 2035. December 2035. The proceeds of the Multiples
Dana dari fasilitas Kredit Berganda akan digunakan Credit facilities will be used for purchase of 1 unit
untuk pembelian 1 unit rig pengeboran dan semua drilling rig and all necessities to support the project.
keperluan untuk mendukung proyek. Fasilitas ini The facilities bear floating interest JIBOR 6 month +
dikenakan bunga mengambang JIBOR 6 bulan + applicable margin per annum.
margin yang berlaku per tahun.
Fasilitas LC sebesar Rp374.000.000.000 – nilai LC facilities amounted to Rp374,000,000,000 – full
penuh atau setara dengan AS$22.000 akan amount or equivalent of US$22,000 will be used for
digunakan untuk pembayaran kepada pemasok rig payment to drilling rig supplier.
pengeboran.
Aset dan saham SEGDS dijaminkan untuk fasilitas Asset and shares of SEGDS is pledged for the
tersebut. Pinjaman tersebut memuat beberapa facilities. The loan contains certain covenants
batasan, termasuk batasan keuangan dan batasan including financial covenants and certain negative
negatif tertentu. covenants.
(vi) Utang Bank SEGPL dan SEGWWL (vi) SEGPL and SEGWWL Bank Loan
Pada tanggal 15 April 2025, SEGPL dan SEGWWL On 15 April 2025, SEGPL and SEGWWL entered
menandatangani perjanjian fasilitas pinjaman into a senior secured term loan facilities agreement
berjangka senior dengan jaminan dengan DBS Bank with DBS Bank Ltd. and Sumitomo Mitsui Banking
Ltd. dan Sumitomo Mitsui Banking Corporation Corporation Singapore Branch (SMBC) for
Singapore Branch (SMBC) untuk komitmen fasilitas, committed facilities – Facility A and Facility B
Fasilitas A dan Fasilitas B masing-masing sebesar amounting to US$114,500 and US$25,000,
AS$114.500 dan AS$25.000 (“Utang Bank SEGPL respectively (the “SEGPL & SEGWWL Bank Loan”).
& SEGWWL”). Fasilitas A dan Fasilitas B memiliki Facility A and Facility B have initial and extended
jatuh tempo awal dan perpanjangan selama 60 dan maturity date of 60 and 120 months, respectively,
120 bulan setelah tanggal perjanjian fasilitas. after the facility agreement date.
Pemanfaatan pertama Utang Bank SEGPL & The SEGPL & SEGWWL Bank Loan first utilisation
SEGWWL dilakukan pada tanggal 30 Juni 2025, was made on 30 June 2025, amounting to
sebesar AS$2.106, yang terdiri dari pemanfaatan US$2,106, which consisted of partial utilisations of
sebagian dari Fasilitas A Fasilitas B masing-masing Facility A and Facility B of US$1,863 and US$243,
sebesar AS$1.863 dan AS$243. Total kas yang respectively. The total cash received was US$1,204
diterima adalah AS$1.204 setelah after taking into account part of the financing costs
memperhitungkan sebagian biaya pembiayaan of US$902. The proceeds were used to finance the
sebesar AS$902. Dana yang diperoleh digunakan ongoing capacity expansion in Wayang Windu.
untuk membiayai ekspansi kapasitas di Wayang
Windu yang sedang berlangsung.
Perjanjian fasilitas dikenakan bunga mengambang The facility agreements bear floating interest
margin yang berlaku ditambah secured overnight applicable margin plus the secured overnight
financing rate (“SOFR”) sebagaimana diterbitkan financing rate (“SOFR”) as published by CME Group
oleh CME Group Benchmark Administration Limited. Benchmark Administration Limited. The interest is
Bunga terutang setiap semester. payable on a semi-annual basis.
98
Page 101
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Pinjaman bank SEGPL & SEGWWL tersebut The SEGPL & SEGWWL Bank Loan is secured by
dijamin dengan beberapa agunan, termasuk gadai several items of collateral including pledge over
atas saham SEGHSDBV, rekening transaksi, dan SEGHSDBV shares, transaction account charge,
increditor deed dari Notes 2033. and 2033 Notes intercreditor deed.
Seluruh jumlah yang telah digunakan dari Pinjaman The entire amount of Facility B Loan that has been
Fasilitas B wajib dilunasi sepenuhnya pada tanggal utilised shall be repaid in full on the initial maturity date,
jatuh tempo awal, atau pada tanggal jatuh tempo or on the extended maturity date if the extension
perpanjangan apabila opsi perpanjangan option is exercised.
dilaksanakan.
Pinjaman tersebut mengandung batasan-batasan The loan contains certain covenants including
tertentu termasuk batasan keuangan (efektif sejak financial covenants (effective from 30 June 2025
30 Juni 2025 sampai tanggal jatuh tempo), serta until the maturity dates), and certain negative
ketentuan negative pledge tertentu. pledge.
(vii) Utang Bank SEGPL, SEGNBV, dan SEGSDBV (vii) SEGPL, SEGNBV, and SEGSDBV Bank Loan
Pada tanggal 19 Juni 2025, SEGPL, SEGNBV, dan On 19 Juni 2025, SEGPL, SEGNBV, and SEGSDBV
SEGSDBV menandatangani perjanjian fasilitas entered into a senior secured term loan facilities
pinjaman berjangka senior dengan jaminan dengan agreement with DBS Bank Ltd. and Sumitomo Mitsui
DBS Bank Ltd. dan Sumitomo Mitsui Banking Banking Corporation Singapore Branch (SMBC) for
Corporation Singapore Branch (SMBC) untuk committed facilities – Facility A and Facility B
komitmen fasilitas, Fasilitas A dan Fasilitas B amounting to US$96,100 and US$25,000,
masing-masing sebesar AS$96.100 dan AS$25.000 respectively (the “SEGPL, SEGNBV & SEGSDBV
(“Utang Bank SEGPL, SEGNBV & SEGSDBV”). Bank Loan”). Facility A and Facility B have initial and
Fasilitas A dan Fasilitas B memiliki jatuh tempo awal extended maturity date of 60 and 120 months,
dan perpanjangan selama 60 dan 120 bulan setelah respectively, after the facility agreement date.
tanggal perjanjian fasilitas.
Per 30 Juni 2025, belum terdapat penarikan dana As of 30 June 2025, no drawdown has been made
atas Fasilitas tersebut. under the Facilities.
Perjanjian fasilitas dikenakan bunga mengambang The facility agreements bear floating interest
margin yang berlaku ditambah secured overnight applicable margin plus the secured overnight
financing rate (“SOFR”) sebagaimana diterbitkan financing rate (“SOFR”) as published by CME Group
oleh CME Group Benchmark Administration Limited. Benchmark Administration Limited. The interest is
Bunga terutang setiap semester. payable on a semi-annual basis.
Pinjaman bank SEGPL, SEGNBV & SEGSDBV The SEGPL, SEGNBV & SEGSDBV Bank Loan is
tersebut dijamin dengan beberapa agunan, secured by several items of collateral including
termasuk gadai atas sebagian saham SEGHSDBV, pledge over a portion of SEGHSDBV shares,
rekening transaksi, dan increditor deed dari Notes transaction account charge, and 2029 Notes and
2029 dan Notes 2038. 2038 Notes intercreditor deed.
Seluruh jumlah yang telah digunakan dari Pinjaman The entire amount of Facility B Loan that has been
Fasilitas B wajib dilunasi sepenuhnya pada tanggal utilised shall be repaid in full on the initial maturity date,
jatuh tempo awal, atau pada tanggal jatuh tempo or on the extended maturity date if the extension
perpanjangan apabila opsi perpanjangan option is exercised.
dilaksanakan.
Pinjaman tersebut mengandung batasan-batasan The loan contains certain covenants including
tertentu termasuk batasan keuangan (efektif sejak financial covenants (effective from 30 June 2025
30 Juni 2025 sampai tanggal jatuh tempo), serta until the maturity dates), and certain negative
ketentuan negative pledge tertentu. pledge.
99
Page 102
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
17. SALDO MAKE-UP ACCOUNT PLN 17. PLN MAKE-UP ACCOUNT BALANCES
Saldo make-up account PLN pada tanggal The PLN make-up account balances as at
30 Juni 2025 dan 31 Desember 2024 merupakan 30 June 2025 and 31 December 2024 represent the
jumlah kumulatif pembayaran listrik dan/atau uap oleh cumulative amount by which the electricity and/or
PLN kepada Grup Kontraktor Salak berdasarkan steam paid by PLN to the Salak Contractor Group
mekanisme take-or-pay di ESC Salak melebihi jumlah based on the take-or-pay mechanism in the Salak ESC
uap dan/atau listrik yang benar-benar diterima oleh PLN exceeds the amount of steam and/or electricity actually
(“nilai make-up PLN”) dikurangi listrik dan/atau uap accepted by PLN (“PLN make-up amount”) minus
yang dikirim oleh Grup sesuai dengan jumlah take-or- electricity and/or steam delivered by the Group
pay berdasarkan Bagian 5.1.1.3 dan Bagian 5.1.2.3 dari pursuant to the take-or-pay amount under Section
ESC Salak. make-up account PLN adalah rekening 5.1.1.3 and Section 5.1.2.3 of the Salak ESC. The PLN
sementara yang menetapkan jumlah make-up PLN make-up account is a temporary account setting out
yang dibayarkan oleh PLN, yang akan the PLN make-up amount paid by PLN, which shall be
dikompensasikan dengan pengiriman listrik atau uap set off against delivery of future electricity or steam by
masa depan oleh Grup yang melebihi jumlah take-or- the Group which exceeds the required take-or-pay
pay yang disyaratkan untuk periode tersebut, dengan amount for such period, provided that such delivery
ketentuan bahwa pengiriman tersebut tunduk pada shall be subject to request from PLN and to be
permintaan dari PLN dan dilakukan atas dasar Upaya performed on SEGS and SEGSPL’s Best Effort basis.
Terbaik SEGS dan SEGSPL. Mekanisme set-off untuk The set-off mechanism to reduce the PLN make-up
mengurangi make-up account PLN sangat terbatas account is strictly limited to delivery of electricity or
pada pengiriman listrik atau uap oleh SEGSL dan steam by SEGSL and SEGSPL. There are no financial
SEGSPL. Tidak ada kewajiban pembayaran finansial repayment obligations under the ESC for SEGSL and
berdasarkan ESC untuk SEGSL dan SEGSPL untuk SEGSPL to settle the make-up account. As of
menyelesaikan make-up account. Per 30 Juni 2025, 30 June 2025, the PLN make-up amount in the PLN
nilai make-up PLN di akun make-up PLN sebesar 191,4 make-up account amounted to 191.4 GWh electricity
GWh listrik (2024: 214GWh) dan 181,4 GWh uap (2024: (2024: 214 GWh) and 181.4 GWh steam (2024: 178.9
178,9 GWh), yang setara dengan AS$22.338 (2024: GWh), which is equivalent to US$22,338 (2024:
AS$23.182). US$23,182).
Realisasi saldo make-up account PLN tunduk pada The realisation of the PLN make-up account balance
persyaratan PLN untuk tanggal pengiriman uap is subject to the requirements of PLN for the delivery
dan/atau listrik di masa mendatang yang mungkin lebih date of steam and/or electricity in the future which may
dari 12 bulan setelah tanggal laporan posisi keuangan. be more than 12 months after the statement of
financial position date.
Berikut ini adalah mutasi saldo make-up account PLN: Set out below is the movement of the PLN make-up
account balances:
30 Juni/ 31 Desember/
June December
2025 2024
Saldo awal 23,182 22,174 Beginning balance
Penambahan 227 1,008 Addition
Realisasi ke laba rugi (1,071) - Realisation to profit or loss
Saldo akhir 22,338 23,182 Ending balance
100
Page 103
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
18. LIABILITAS IMBALAN PASCA KERJA 18. POST-EMPLOYMENT BENEFITS LIABILITIES
30 Juni/ 31 Desember/
June December
2025 2024
Liabilitas imbalan kerja Long-term employee
jangka panjang benefit liabilities
Imbalan pasca kerja Post-employment benefits
Program pensiun manfaat pasti 16,731 15,418 Defined benefit pension program
Program masa persiapan pensiun 1,259 1,193 Pre-retirement benefit program
Imbalan jangka panjang lainnya 346 323 Other long-term benefits
Jumlah 18,336 16,934 Total
Beban diakui di laba rugi Expense recognised in profit or loss
Imbalan pasca kerja Post-employment benefits
Program pensiun manfaat pasti 1,600 3,078 Defined benefit pension program
Program masa persiapan pensiun 70 147 Pre-retirement benefit program
Imbalan jangka panjang lainnya 28 105 Other long-term benefits
Jumlah 1,698 3,330 Total
Pengukuran kembali program Remeasurement of defined benefit
manfaat pasti diakui di plan recognised in other
penghasilan komprehensif lain comprehensive income
Imbalan pasca kerja Post-employment benefits
Program pensiun manfaat pasti (2) (364) Defined benefit pension program
Program masa persiapan pensiun - (82) Pre-retirement benefit program
Imbalan jangka panjang lainnya - - Other long-term benefits
Jumlah (2) (446) Total
Program pensiun manfaat pasti Defined benefit pension program
Perusahaan-perusahaan yang relevan dalam Grup The relevant companies within the Group have set up
telah menyiapkan dana untuk pembayaran imbalan funds for the payment of post-employment benefits for
pasca kerja bagi karyawan mereka. Dana tersebut their employees. The funds are placed in a Pension
ditempatkan dalam Program Pensiun Untuk Program for Pension Compensation (“DPLK PPUKP”),
Kompensasi Pensiun (“DPLK PPUKP”) yang dikelola which is managed by DPLK PPUKP Allianz Indonesia.
oleh DPLK PPUKP Allianz Indonesia.
DPLK PPUKP adalah program untuk mendanai skema DPLK PPUKP is a program to fund the defined benefit
manfaat pasti, yang menyediakan pesangon dan uang schemes, which provides for severance and gratuity
penghargaan masa kerja dalam bentuk dana pay in the form of pooled funds. DPLK PPUKP acts as
gabungan. DPLK PPUKP bertindak sebagai pengurus an administrator and fund manager and does not take
dan pengelola dana dan tidak bertanggung jawab atas liability for sufficiency of the fund to pay actual claims.
kecukupan dana untuk membayar klaim yang The assets of the fund are to be used only to settle the
sebenarnya. Aset dana akan digunakan hanya untuk employee benefit obligations. The assets of the fund
menyelesaikan kewajiban imbalan kerja. Aset dana can be returned to the relevant Group company when
dapat dikembalikan ke perusahaan Grup yang relevan the employment of all members has been terminated.
ketika pekerjaan semua anggota telah dihentikan.
101
Page 104
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Program masa persiapan pensiun Pre-retirement benefit program
Perusahaan-perusahaan yang relevan dalam Grup The relevant companies within the Group provide pre-
memberikan program masa persiapan pensiun bagi retirement benefit programs for employees who had
karyawan yang telah bekerja selama minimal 15 tahun been working for a minimum of 15 years to be inactive
untuk tidak aktif selama tiga bulan sebelum mencapai for three months prior to attaining normal retirement
usia pensiun normal. Selama periode ini, karyawan age. During this period, the employees are entitled to
tersebut berhak atas pendapatan bulanan. monthly income.
Imbalan jangka panjang lainnya Other long-term benefits
Perusahaan-perusahaan yang relevan dalam Grup The relevant companies within the Group provide a
memberikan program imbalan jangka panjang lainnya long-term service anniversary award which will be given
dalam bentuk penghargaan ulang tahun dinas yang to employees every five years.
akan diberikan kepada karyawan setiap lima tahun
sekali.
Asumsi utama yang digunakan dalam perhitungan The principal assumptions used in the calculation of
kewajiban imbalan pasca kerja post-employment benefits obligations
Asumsi-asumsi utama yang digunakan dalam The principal assumptions used in determining the
menentukan kewajiban imbalan pasca kerja karyawan Group’s post-employment benefits obligations are as
Grup adalah sebagai berikut: follows:
30 Juni/ 31 Desember/
June December
2025 2024
Tabel mortalita TMI IV TMI IV Mortality table
Tingkat disabilitas 5% TMI IV 5% TMI IV Disability rate
Usia pensiun normal 56-58 56-58 Normal retirement age
Asumsi mengenai pengalaman mortalitas di masa Assumptions regarding future mortality experience are set
depan ditetapkan berdasarkan nasihat aktuaria sesuai based on actuarial advice in accordance with published
dengan statistik yang dipublikasikan dan pengalaman statistics and experience by the Group. The mortality
Grup. Asumsi mortalitas yang digunakan didasarkan assumptions used are based on the Indonesian insurance
pada tingkat mortalitas industri asuransi Indonesia industry mortality rate which is used for individual life
yang digunakan untuk kontrak asuransi jiwa insurance contracts; namely the Indonesian Mortality
perorangan; yaitu Tabel Mortalita Indonesia 2019 (“TMI Table 2019 (“TMI IV”) with a further 5% provision for
IV”) dengan provisi tambahan 5% morbiditas yang morbidity which is applied in calculating the long-term
diterapkan dalam menghitung liabilitas imbalan jangka benefits liability recognised within the consolidated
panjang yang diakui dalam laporan posisi keuangan statements of financial position.
konsolidasian.
Perhitungan aktuaria untuk program pensiun, program The actuarial calculations of pension program, pre-
masa persiapan pensiun dan imbalan jangka panjang retirement benefit program and other long-term benefits
lainnya pada tanggal 31 Desember 2024 dihitung oleh as at 31 December 2024 were calculated by a registered
Kantor Konsultan Aktuaria terdaftar, KKA Riana & Actuarial Consulting Firm, KKA Riana & Partners as set
Rekan sebagaimana dituangkan dalam laporan out in their reports dated 26 February 2025.
tertanggal 26 Februari 2025.
102
Page 105
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
i. Program pensiun manfaat pasti i. Defined benefit pension program
Jumlah liabilitas yang diakui pada laporan posisi The liability recognised in the consolidated
keuangan konsolidasian ditentukan sebagai statements of financial position is determined as
berikut: follows:
30 Juni/ 31 Desember/
June December
2025 2024
Nilai kini kewajiban yang didanai 35,318 34,246 Present value of funded obligations
Nilai wajar aset program (18,587) (18,828) Fair value of plan assets
Liabilitas pada laporan posisi Liabilities in the consolidated
keuangan konsolidasian 16,731 15,418 statements of financial position
Mutasi kewajiban program pensiun manfaat pasti The movement in the defined benefit pension
adalah sebagai berikut: program obligation is as follows:
30 Juni/ 31 Desember/
June December
2025 2024
Pada awal tahun 34,246 36,082 At the beginning of the year
Akuisisi entitas anak - 94 Acquisitions of subsidiaries
Penyesuaian atas mutasi kewajiban - - Adjustment due to transfers of liability
Dibebankan ke laba rugi: Charged to profit or loss
Biaya jasa kini 1,195 2,273 Current service cost
Biaya bunga 1,041 2,095 Interest expense
Biaya jasa lalu - 17 Past service cost
Biaya imbalan pensiun dini - - Early retirement benefit cost
Biaya terminasi - - Termination cost
Kerugian/(keuntungan) dari Losses/(gains) from
perubahan selisih kurs (112) (1,664) foreign exchange differences
2,124 2,721
Kerugian/(keuntungan) aktuaria Actuarial losses/(gains) from
dari perubahan: changes in:
Asumsi keuangan (2) (910) Financial assumptions
Penyesuaian pengalaman - 546 Experience adjustments
Asumsi demografi - - Demographic assumptions
Dampak atas batas atas aset - - Effect of asset ceiling
(2) (364)
Imbalan yang dibayar (1,050) (4,287) Benefits paid
Jumlah 35,318 34,246 Total
Asumsi aktuarial utama yang digunakan adalah The principal actuarial assumptions used were as
sebagai berikut: follows:
30 Juni/ 31 Desember/
June December
2025 2024
Tingkat diskonto 7,00% 7,00% Discount rate
Tingkat kenaikan gaji per tahun 3.00% 3.00% Salary growth rate per annum
Mutasi nilai wajar aset program adalah sebagai The movement in the fair value of plan assets is as
berikut: follows:
103
Page 106
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
30 Juni/ 31 Desember/
June December
2025 2024
Pada awal tahun 18,828 21,642 At the beginning of the year
Dibebankan ke laba rugi: Charged to profit or loss:
Pendapatan bunga 636 1,307 Interest income
Keuntungan/(kerugian) dari Gains/(losses) from foreign exchange
perubahan selisih kurs (83) (959) differences
19,381 21,990
Keuntungan/(kerugian) aktuaria: Actuarial gains/(losses) from:
Pengukuran kembali imbalan Remeasurement of return
hasil atas aset 253 (627) on plan assets
Iuran pemberi kerja - 1,480 Employer’s contributions
Pembayaran manfaat (1,047) (4,015) Benefit payments
Jumlah 18,587 18,828 Total
Pada tanggal 30 Juni 2025 dan 31 Desember 2024, As at 30 June 2025 and 31 December 2024, the
kategori utama aset program yang dikelola oleh major categories of plan assets managed by DPLK
DPLK Allianz pada akhir periode pelaporan adalah Allianz at the end of the reporting period are as
sebagai berikut: follows:
30 Juni/ 31 Desember/
June December
2025 2024
Investasi pendapatan tetap 18,198 18,428 Fixed income investment
Investasi pasar uang 389 400 Money market investment
Jumlah 18,587 18,828 Total
Analisis sensitivitas di bawah ini telah ditentukan The sensitivity analysis below has been determined
berdasarkan kemungkinan perubahan yang wajar based on the reasonably possible changes of each
dari setiap asumsi signifikan dalam perhitungan significant assumption in the calculation of the
program pensiun manfaat pasti pada akhir periode defined benefit pension program as at the end of the
pelaporan, dengan asumsi semua asumsi lain reporting period, assuming all other assumptions
tetap konstan: were held constant:
Dampak terhadap liabilitas
imbalan pasti/Impact on
defined benefit obligation
Perubahan Kenaikan Penurunan
asumsi/ asumsi/ asumsi/
Change in Increase in Decrease in
assumptions assumptions assumptions
Tingkat diskonto 1% (2,054) 2,264 Discount rate
Tingkat kenaikan gaji 1% 2,386 (2,196) Salary growth rate
104
Page 107
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
ii. Program masa persiapan pensiun ii. Pre-retirement benefit program
Mutasi kewajiban program masa persiapan The movement in the pre-retirement benefit
pensiun adalah sebagai berikut: program obligation is as follows:
30 Juni/ 31 Desember/
June December
2025 2024
Pada awal tahun 1,193 1,228 At the beginning of the year
Dibebankan ke laba rugi: Charged to profit or loss:
Biaya jasa kini 33 71 Current service cost
Biaya bunga 37 76 Interest expense
Kerugian/(keuntungan) dari Losses/(gains) from foreign exchange
perubahan selisih kurs (3) (57) differences
1,260 1,318
Keuntungan/(kerugian) aktuaria Actuarial losses/(gains) from
dari perubahan: changes in:
Asumsi keuangan - (28) Financial assumptions
Penyesuaian pengalaman - (54) Experience adjustments
Asumsi demografi - - Demographic assumptions
- (82)
Imbalan yang dibayar (1) (43) Benefit payments
Jumlah 1,259 1,193 Total
Asumsi aktuarial utama yang digunakan adalah The principal actuarial assumptions used were as
sebagai berikut: follows:
30 Juni/ 31 Desember/
June December
2025 2024
Tingkat diskonto 7.00% 7.00% Discount rate
Tingkat kenaikan gaji per tahun 3.00% 3.00% Salary growth rate per annum
Analisis sensitivitas di bawah ini telah ditentukan The sensitivity analysis below has been determined
berdasarkan kemungkinan perubahan yang wajar based on the reasonably possible changes of each
dari setiap asumsi signifikan yang digunakan dalam significant assumption used in the calculation of the
perhitungan program masa persiapan pensiun pada pre-retirement benefit program as at the end of the
akhir periode pelaporan, dengan asumsi semua reporting period, assuming all other assumptions
asumsi lain tetap konstan: were held constant:
Dampak terhadap program masa
persiapan pensiun/ impact on
pre-retirement benefits program
Perubahan Kenaikan Penurunan
asumsi/ asumsi/ asumsi/
Change in Increase in Decrease in
assumptions assumptions assumptions
Tingkat diskonto 1% (68) 76 Discount rate
Tingkat kenaikan gaji 1% 78 (76) Salary growth rate
105
Page 108
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
iii. Imbalan jangka panjang lainnya iii. Other long-term benefit
Mutasi kewajiban imbalan jangka panjang lainnya The movement in the other long-term benefit
adalah sebagai berikut: program obligation is as follows:
30 Juni/ 31 Desember/
June December
2025 2024
Pada awal tahun 323 242 At the beginning of the year
Dibebankan ke laba rugi: Charged to profit or loss:
Biaya jasa kini 18 26 Current service cost
Biaya bunga 11 15 Interest expense
Perubahan selisih kurs (1) (6) Foreign exchange differences
Kerugian/(keuntungan) Actuarial losses/(gains)
aktuaria dari perubahan: from changes in:
Asumsi keuangan - 14 Financial assumptions
Penyesuaian pengalaman - 50 Experience adjustments
28 99
Imbalan yang dibayar (5) (18) Benefit payments
Jumlah 346 323 Total
Asumsi aktuarial utama yang digunakan adalah The principal actuarial assumptions used were as
sebagai berikut: follows:
30 Juni/ 31 Desember/
June December
2025 2024
Tingkat diskonto 7.00% 7.00% Discount rate
Tingkat kenaikan gaji per tahun 3.00% 3.00% Salary growth rate per annum
Analisis sensitivitas di bawah ini telah ditentukan The sensitivity analysis below has been determined
berdasarkan kemungkinan perubahan yang wajar based on the reasonably possible changes of each
dari setiap asumsi signifikan yang digunakan significant assumption used in the calculation of the
dalam perhitungan program imbalan jangka other long-term benefit program as at the end of the
panjang lainnya pada akhir periode pelaporan, reporting period, assuming all other assumptions
dengan asumsi semua asumsi lain tetap konstan: were held constant:
Dampak terhadap imbalan
jangka panjang lainnya/
Other long-term benefit
Perubahan Kenaikan Penurunan
asumsi/ asumsi/ asumsi/
Change in Increase in Decrease in
assumptions assumptions assumptions
Tingkat diskonto 1% (16) 19 Discount rate
Tingkat kenaikan gaji 1% 12 (11) Salary growth rate
Grup terekspos dengan beberapa risiko melalui The Group is exposed to a number of risks through its
program imbalan pasti, program masa persiapan defined benefit pension program, pre-retirement benefit
pensiun dan imbalan jangka panjang lainnya. Risiko program and other long-term benefit program. The most
yang paling signifikan adalah sebagai berikut: significant risks are as follows:
Volatilitas Aset Asset volatility
Kewajiban dihitung menggunakan tingkat diskonto yang The liabilities are calculated using a discount rate set with
merujuk kepada Zero-Coupon Bond dari Indonesia reference to the Zero-Coupon Bond from the Indonesian
Government Securities Yield Curve (“IGSYC”). Jika Government Securities Yield Curve (“IGSYC”). If the plan
imbal hasil aset program lebih rendah, maka akan assets underperform this yield, it will create a deficit.
menghasilkan defisit program.
106
Page 109
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Grup menempatkan aset program investasinya di pasar The Group places its investment plan assets in active
aktif (pendapatan tetap dan investasi pasar uang) yang markets (fixed income and money market investments)
tidak memiliki harga pasar yang dikutip. which did not have a quoted market.
Harapan umur hidup Life expectancy
Sebagian besar dari kewajiban manfaat pasti The majority of the defined benefit obligation is to provide
menyediakan manfaat seumur hidup, sehingga benefits for the life of the members, so increases in life
kenaikan harapan umur hidup akan mengakibatkan expectancy will result in an increase in the employee
kenaikan liabilitas manfaat karyawan. benefit liabilities.
Durasi rata-rata program imbalan pasti, program masa The average duration of the defined benefit pension
persiapan pensiun dan imbalan jangka panjang lainnya program, pre-retirement benefit program and other long-
pada akhir periode pelaporan berkisar antara 7,28– term benefit program at the end of the reporting period
11,24 tahun, 5,33–10,87 tahun dan 6,04–7,73 tahun ranges from 7.28–11.24 years, 5.33–10.87 years, and
secara berurutan. 6.04–7.73 years, respectively.
Manfaat yang diharapkan akan dibayarkan setiap tahun The benefits expected to be paid in each of the next five
selama lima tahun ke depan, dan agregat untuk lima years, and the aggregate for the five years thereafter are
tahun sesudahnya adalah sebagai berikut (tidak as follows (undiscounted):
didiskonto):
Antara dua Lebih
Kurang dari sampai lima dari
satu tahun/ tahun/ lima tahun/
Less than Between two Over Jumlah/
one year to five years five years Total
Program pensiun Defined benefit
manfaat pasti 3,028 17,556 69,627 90,211 pension program
Program persiapan masa Pre-retirement
pensiun 104 617 2,459 3,180 benefit program
Imbalan jangka panjang Other long-term
lainnya 33 207 977 1,217 benefit program
Jumlah 3,165 18,380 73,063 94,608 Total
Manajemen Grup berpendapat bahwa estimasi liabilitas The management of the Group believes that the estimated
imbalan pasca kerja cukup untuk menutupi semua liability provided for post-employment benefits is adequate
imbalan yang diatur dalam Peraturan-peraturan to cover the requirements of the manpower regulations or
Ketenagakerjaan atau Perjanjian Kerja Bersama. Collective Labour Agreement.
19. MODAL SAHAM DAN CADANGAN LAINNYA 19. SHARE CAPITAL AND OTHER RESERVES
a. Modal saham a. Share capital
Seluruh saham Perusahaan tercatat di Bursa Efek All shares in the Company have been listed on the
Indonesia sejak 9 Oktober 2023. Struktur Indonesia Stock Exchange since 9 October 2023.
pemegang saham Perusahaan pada tanggal The Company’s shareholders as at 30 June 2025
30 Juni 2025 berdasarkan catatan yang dibuat oleh based on the records maintained by
PT Kustodian Sentral Efek Indonesia, biro PT Kustodian Sentral Efek Indonesia, the share
administrasi efek, adalah sebagai berikut: administrator, were as follows:
107
Page 110
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
30 Juni/ June 2025
Persentase
Lembar kepemilikan/
saham/ Percentage Nilai/
Number of of ownership Amount
Pemegang saham/Shareholders shares (%) (AS$/US$)
Barito Pacific 86,514,146,666 64.67 832,080 Barito Pacific
Green Era 31,577,660,000 23.60 303,698 Green Era
Pemegang saham lainnya 15,688,413,334 11.73 150,884 Other Shareholders
Saham diperoleh kembali 6,000,000 0.00 58 Treasury Stocks
Jumlah 133,786,220,000 100.00 1,286,720 Total
Pemegang saham Perusahaan pada tanggal The Company’s shareholders as at 31 December
31 Desember 2024 adalah sebagai berikut: 2024 were as follows:
31 Desember/ December 2024
Persentase
Lembar kepemilikan/
saham/ Percentage Nilai/
Number of of ownership Amount
Pemegang saham/Shareholders shares (%) (AS$/US$)
Barito Pacific 86,514,146,666 64.67 832,080 Barito Pacific
Green Era 31,577,660,000 23.60 303,698 Green Era
Pemegang saham lainnya 15,694,413,334 11.73 150,942 Other Shareholders
Jumlah 133,786,220,000 100.00 1,286,720 Total
Berdasarkan Akta Notaris No. 54 oleh Aulia Based on the Notarial Deed No. 54 of Aulia Taufani,
Taufani, S.H., notaris di Jakarta Selatan, tertanggal S.H., a notary in South Jakarta, dated 15 June 2023
15 Juni 2023 dan telah mendapatkan persetujuan and approved by the Minister of Law and Human
dari Menteri Hukum dan Hak Asasi Manusia Rights of the Republic of Indonesia through Decree
Republik Indonesia melalui Keputusan No. AHU- No. AHU-0033656.AH.01.02.Tahun 2023 dated 16
0033656.AH.01.02.Tahun 2023 tanggal 16 Juni June 2023, the Shareholders agree the change of
2023, pemegang saham menyetujui pemecahan the Company’s nominal share value from
nilai nominal saham Perusahaan dari semula IDR1,000,000 – full amount per share to become
Rp1.000.000 – nilai penuh per lembar saham IDR150 – full amount per share.
menjadi Rp150 – nilai penuh per lembar saham.
Pemegang saham biasa berhak menerima dividen The holders of ordinary shares are entitled to
pada saat dan ketika diumumkan oleh Perusahaan. receive dividends as and when declared by the
Semua saham biasa membawa satu suara per Company. All ordinary shares carry one vote per
saham. share.
Sampai 30 Juni 2025, Perusahaan mengumumkan Until 30 June 2025, the Company declared and
dan membayarkan dividen kepada para pemegang paid dividends to the shareholders of the Company
saham Perusahaan sebesar AS$nihil (31 amounted to US$nil (31 December 2024:
Desember 2024: AS$48.496). US$48,496).
Sampai 30 Juni 2025, entitas-entitas anak During 30 June 2025, the subsidiaries of the
Perusahaan mengumumkan dan membayarkan Company declared and paid dividends to non-
dividen kepada pihak non-pengendali sebesar controlling interests amounted to US$5,313 (31
AS$5.313 (31 Desember 2024: AS$28.001). December 2024: US$28,001).
108
Page 111
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
b. Tambahan modal disetor b. Additional paid-in capital
30 Juni/ 31 Desember/
June December
2025 2024
Saldo awal (338,977) (338,977) Beginning balance
Biaya emisi saham - - Share issuance costs
Tambahan modal disetor saat Additional paid-in capital
Penawaran Umum Saham Perdana - - from IPO
Jumlah (338,977) (338,977) Total
c. Cadangan lainnya c. Other reserves
30 Juni/ 31 Desember/
June December
2025 2024
Pengaruh transaksi yang melibatkan Effect of transactions involving
entitas sepengendali (987,622) (987,622) entities under common control
Penjabaran mata uang asing - - Foreign currency translation
Kerugian komprehensif tahun berjalan - - Other comprehensive loss of the year
Premi yang dibayarkan atas Premium paid on acquisition of
akuisisi anak perusahaan subsidiaries with participating
dengan hak partisipasi - - interests
Jumlah (987,622) (987,622) Total
Perubahan cadangan lainnya adalah sebagai Changes in the other reserves is as follows:
berikut:
30 Juni/ 31 Desember/
June December
2025 2024
Premi yang dibayarkan atas akuisisi Premium paid on acquisition of
anak perusahaan dengan subsidiaries with participating
hak partisipasi: interests:
Pada awal tahun (10,274) (10,274) At the beginning of the year
Transaksi dengan kepentingan Transactions with non-controlling
non-pengendali - - interests
Pada akhir tahun (10,274) (10,274) At the end of the year
109
Page 112
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
d. Cadangan umum d. General reserve
Undang-Undang Perseroan Terbatas Republik The Limited Liability Company Law of the Republic of
Indonesia No. 40/2007 yang diterbitkan pada bulan Indonesia No. 40/2007 issued in August 2007
Agustus 2007 mewajibkan pembentukan cadangan requires the establishment of a general reserve from
umum dari laba bersih hingga mencapai paling net profits of at least 20% of a company’s issued and
sedikit 20% dari modal yang telah ditempatkan dan paid-up capital. There is no time limit on the
disetor penuh. Tidak ada batasan waktu untuk establishment of the reserve.
pembentukan cadangan.
Pada tanggal 8 Juni 2023, melalui keputusan On 8 June 2023, circular resolutions of the
sirkuler pemegang saham sebagai pengganti rapat shareholders in lieu of the extraordinary general
umum pemegang saham luar biasa Perusahaan meeting of shareholders of the Company approved
menyetujui dan memutuskan penetapan and decided the use of net profit of the Company
penggunaan laba bersih Perusahaan dari tahun from the financial year ended 31 December 2022
buku yang berakhir pada tanggal 31 Desember amounted to US$911 as a general reserve fund and
2022 sebesar AS$911 sebagai cadangan umum the remaining as retained earnings, which was
dan sisanya sebagai laba ditahan, yang kemudian subsequently formalised through Notarial Deed No.
diresmikan melalui Akta Notaris No. 52 oleh Aulia 52 of Aulia Taufani, S.H., a notary in South Jakarta,
Taufani, S.H., notaris di Jakarta Selatan, tertanggal dated 15 June 2023. The general reserve is
15 Juni 2023. Cadangan umum disajikan sebagai presented as appropriated retained earnings in the
laba ditahan yang telah ditentukan penggunaannya statement of financial position.
pada laporan posisi keuangan.
Pada tanggal 29 Mei 2024, melalui rapat umum On 29 May 2024, through annual general meeting of
pemegang saham tahunan, pemegang saham shareholders of the Company approved and decided
menyetujui dan memutuskan penetapan the use of net profit of the Company from the financial
penggunaan laba bersih Perusahaan dari tahun year ended 31 December 2023 amounted to
buku yang berakhir pada tanggal 31 Desember US$1,100 as a general reserve fund and the
2023 sebesar AS$1.100 sebagai cadangan umum remaining as retained earnings, which was
dan sisanya sebagai laba ditahan, yang kemudian subsequently formalised through Notarial Deed No.
diresmikan melalui Akta Notaris No. 17 oleh Aryanti 17 of Aryanti Artisari, S.H., M.Kn., a notary in South
Artisari, S.H., M.Kn. notaris di Jakarta Selatan, Jakarta, dated 29 Mei 2024. The general reserve is
tertanggal 29 Mei 2024. Cadangan umum disajikan presented as appropriated retained earnings in the
sebagai laba ditahan yang telah ditentukan statement of financial position.
penggunaannya pada laporan posisi keuangan.
Pada tanggal 18 Juni 2025, melalui rapat umum On 18 June 2025, through annual general meeting of
pemegang saham tahunan, pemegang saham shareholders of the Company approved and decided
menyetujui dan memutuskan penetapan the use of net profit of the Company from the financial
penggunaan laba bersih Perusahaan dari tahun year ended 31 December 2024 amounted to
buku yang berakhir pada tanggal 31 Desember US$1,220 as a general reserve fund and the
2024 sebesar AS$1.220 sebagai cadangan umum remaining as retained earnings, which was
dan sisanya sebagai laba ditahan, yang kemudian subsequently formalised through Notarial Deed No.
diresmikan melalui Akta Notaris No. 72 oleh Aulia 72 of Aulia Taufani, S.H., a notary in South Jakarta,
Taufani, S.H., notaris di Jakarta Selatan, tertanggal dated 18 June 2025. The general reserve is
18 Juni 2025. Cadangan umum disajikan sebagai presented as appropriated retained earnings in the
laba ditahan yang telah ditentukan penggunaannya statement of financial position.
pada laporan posisi keuangan.
20. SAHAM TREASURI 20. TREASURY SHARES
Pada tanggal 24 Maret 2025 sampai dengan 23 On 24 March 2025 to 23 June 2025, the Company
Juni 2025, Perusahaan melakukan pembelian carried out share buybacks in significantly fluctuating
kembali saham dalam kondisi pasar berfluktuasi market conditions without the Company’s General
signifikan tanpa memperoleh persetujuan Rapat Meeting of Shareholders ("GMS") as stipulated by
Umum Pemegang Saham ("RUPS"), sesuai pasal article 7 of OJK Regulation No.13 in 2023.
7 Peraturan OJK No.13 tahun 2023.
110
Page 113
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Untuk periode enam bulan yang berakhir pada For the six-month period ended 30 June 2025, the
tanggal 30 June 2025, Perusahaan melakukan Company conducted the Buyback through the
Pembelian Kembali melalui Bursa Efek Indonesia Indonesia Stock Exchange of 6,000,000 shares
sejumlah 6.000.000 lembar saham sebesar Rp32 amounted to Rp32 billion (full amount) or equivalent
miliar (nilai penuh) atau setara dengan AS$1.930. to US$1,930. Up to 30 June 2025, total Buyback was
Sampai dengan tanggal 30 June 2025, jumlah 6,000,000 shares. The total amount paid to buyback
Pembelian Kembali adalah sejumlah 6.000.000 the shares was Rp32 billion (full amount) or
lembar saham. Total pembayaran untuk equivalent to US$1,930.
melakukan pembelian kembali saham tersebut
adalah sebesar Rp32 miliar (nilai penuh) atau
setara dengan AS$1.930.
Adapun mutasi jumlah lembar saham dan nilai The mutations in the number of shares and the value
saham treasuri untuk tahun yang berakhir pada 30 of treasury shares for the years ended 30 June 2025
Juni 2025 adalah sebagai berikut: are as follows:
Jumlah saham treasuri/ Total treasury shares
Lembar saham/ Jumlah/ total
Number of shares (in US$'000)
Saldo 1 Januari 2025 - - Balance as of 1 January 2025
Pembelian saham treasuri 6,000,000 1,930 Buyback of treasury shares
Saldo 30 Juni 2025 6,000,000 1,930 Balance as of 30 June 2025
21. KEPENTINGAN NON-PENGENDALI 21. NON-CONTROLLING INTERESTS
30 Juni/June 2025
Penghasilan
komprehensif
Bagian lain/ Akuisisi
Saldo awal/ atas laba neto/ Other entitas anak/ Saldo akhir/
Beginning Share in comprehensive Dividen/ Acquisition of Ending
balance net profit income Dividends subsidiary balance
ACEHI 166,270 10,515 25 (4,013) - 172,797 ACEHI
DGA SEG B.V. 42,307 6,145 5 (1,300) - 47,157 DGA SEG B.V.
ACEN INVEST MENT - ACEN INVESTMENT
HK LIMITED 5,371 (97) 71 - 11,623 16,968 HK LIMIT ED
Lain-lain 1,723 102 3 - - 1,828 Others
Jumlah 215,671 16,665 104 (5,313) 11,623 238,750 Total
31 Desember/December 2024
Penghasilan
komprehensif
Bagian lain/ Akuisisi
Saldo awal/ atas laba neto/ Other entitas anak/ Saldo akhir/
Beginning Share in comprehensive Dividen/ Acquisition of Ending
balance net profit income Dividends subsidiary balance
ACEHI 165,060 20,743 (32) (19,501) - 166,270 ACEHI
DGA SEG B.V. 38,340 12,469 (2) (8,500) - 42,307 DGA SEG B.V.
Lain-lain 2,829 (237) 3 - 4,499 7,094 Others
Jumlah 206,229 32,975 (31) (28,001) 4,499 215,671 Total
111
Page 114
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Berikut adalah ringkasan informasi keuangan Star Below is the summarised financial information of Star
Energy Geothermal Holdings (Salak-Darajat) B.V. yang Energy Geothermal Holdings (Salak-Darajat) B.V. that
memiliki kepentingan nonpengendali yang material has non-controlling interests that are material to the
terhadap Grup. Group.
Ringkasan laporan posisi keuangan konsolidasian Summarised consolidated statements of financial position
adalah sebagai berikut: are as follows:
30 Juni/ 31 Desember/
June December
2025 2024
Aset Assets
Aset lancar 307,763 326,698 Current assets
Aset tidak lancar 2,497,758 2,485,368 Non-current assets
Jumlah aset 2,805,521 2,812,066 Total assets
Liabilitas Liabilities
Liabilitas jangka pendek (88,628) (115,688) Current liabilities
Liabilitas jangka panjang (1,580,588) (1,603,676) Non-current liabilities
Jumlah liabilitas (1,669,216) (1,719,364) Total liabilities
Aset bersih 1,136,305 1,092,702 Net assets
Ringkasan laporan laba rugi dan penghasilan Summarised consolidated statements of profit or loss and
komprehensif lain konsolidasian adalah sebagai other comprehensive income are as follows:
berikut:
30 Juni/ 30 Juni/
June June
2025 2024
Pendapatan 193,108 183,007 Revenue
Laba tahun berjalan 70,187 67,805 Profit for the year
(Kerugian)/penghasilan Other comprehensive
komprehensif tahun (loss)/income
berjalan, setelah pajak 167 (421) for the year, net of tax
Jumlah keuntungan komprehensif Total comprehensive income for
tahun berjalan 70,354 67,384 the year
Ringkasan laporan arus kas konsolidasian adalah Summarised consolidated statements of cash flows are as
sebagai berikut: follows:
112
Page 115
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
30 Juni/ 30 Juni/
June June
2025 2024
Kas bersih yang diperoleh Net cash generated from
dari aktivitas operasi 79,393 94,906 operating activities
Kas bersih yang digunakan Net cash used in
untuk aktivitas investasi (41,375) (20,614) investing activities
Kas bersih yang digunakan Net cash used
untuk aktivitas pendanaan 31,244 (61,867) in financing activities
Kenaikan/(penurunan) bersih Net increase/(decrease)
kas dan setara kas 69,262 12,425 in cash and cash equivalents
Kas dan setara kas pada awal Cash and cash equivalents at
tahun 72,398 99,795 the beginning of the year
Kas dan setara kas pada akhir Cash and cash equivalents at
periode 141,660 112,220 the end of period
22. PENDAPATAN 22. REVENUE
30 Juni/ 30 Juni/
June June
2025 2024
Pihak ketiga Third parties
Pendapatan dari kontrak dengan Revenue from contracts with
pelanggan: customers:
Penjualan listrik 139,087 132,545 Sales of electricity
Penjualan uap 63,610 59,997 Sales of steam
Biaya manajemen 22 18 Management fee
Penjualan kredit karbon - - Sales of carbon credits
Pendapatan sewa operasi 76,564 77,695 Operating lease income
Pendapatan sewa pembiayaan 20,790 19,817 Finance lease income
Jumlah 300,073 290,072 Total
Penjualan listrik dan uap, pendapatan sewa operasi dan Sales of electricity and steam, operating lease income and
pendapatan sewa pembiayaan dihasilkan dari PLN. finance lease income are generated from PLN. There are
Tidak ada pelanggan lain dengan penjualan di atas 10% no other customers with sales above 10% of total revenue.
dari total pendapatan.
23. BIAYA BERDASARKAN FUNGSI 23. EXPENSE BY FUNCTION
Daftar rincian beban usaha untuk tahun yang berakhir The detailed schedule of operating expenses for the year
pada tanggal 30 Juni 2025 dan 2024 adalah sebagai ended 30 June 2025 and 2024 were as follows:
berikut:
30 Juni/ 30 Juni/
June June
2025 2024
Beban usaha: Operating expenses:
Depresiasi dan amortisasi (47,728) (36,944) Depreciation and amortisation
Kompensasi dan tunjangan Employee compensation and
karyawan (21,630) (21,866) benefits
Konsultan dan teknisi (7,257) (6,964) Consultant and technician
Tunjangan produksi kepada PGE (9,158) (8,417) Production allowance to PGE
Lain-lain, bersih (8,820) (9,809) Others, net
Jumlah (94,593) (84,000) Total
Tidak ada pemasok dengan transaksi pembelian di atas There are no suppliers with purchase transactions above
10% dari total beban usaha. 10% of total operating expenses.
113
Page 116
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Daftar rincian beban kompensasi dan tunjangan The detailed schedule of employee compensation and
karyawan untuk tahun yang berakhir pada tanggal benefits for the years ended 30 June 2025 and 2024 were
30 Juni 2025 dan 2024 adalah sebagai berikut: as follows:
30 Juni/ 30 Juni/
June June
2025 2024
Tunjangan dan gaji (20,065) (20,476) Wages and salaries
Pelatihan dan perjalanan bisnis (550) (455) Training and business travel
Katering dan makanan (697) (670) Catering and food
Lain-lain (318) (265) Others
Jumlah (21,630) (21,866) Total
Daftar rincian (beban)/pendapatan non-operasional The detailed schedule of non-operating (expense)/income
untuk tahun yang berakhir pada tanggal 30 Juni 2025 for the years ended 30 June 2025 and 2024 were as
dan 2024 adalah sebagai berikut: follows:
30 Juni/ 30 Juni/
June June
2025 2024
(Beban)/pendapatan non-operasional: Non-operating (expenses)/income:
Beban keuangan (58,792) (67,920) Finance costs
Kerugian kurs mata uang asing, bersih (397) (519) Loss on foreign exchange, net
Pendapatan bunga 5,856 7,558 Interest income
Beban lain-lain, bersih 197 (2,131) Other expenses, net
Jumlah (53,136) (63,012) Total
24. BEBAN KEUANGAN 24. FINANCE COSTS
30 Juni/ 30 Juni/
June June
2025 2024
Senior secured notes: Senior secured notes:
Beban bunga (36,160) (38,772) Interest expense
Amortisasi biaya pembiayaan Amortisation of deferred
yang ditangguhkan (1,065) (1,143) financing costs
Utang bank: Bank loans:
Beban bunga (20,283) (27,183) Interest expense
Amortisasi biaya pembiayaan Amortisation of deferred
yang ditangguhkan (911) (572) financing costs
Breaking costs - - Breaking costs
Beban bunga atas Interest expense on
liabilitas sewa (300) (216) lease liabilities
Lain-lain (73) (34) Others
Jumlah (58,792) (67,920) Total
114
Page 117
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
25. PERPAJAKAN 25. TAXATION
a. Utang pajak a. Taxes payable
30 Juni/ 31 Desember/
June December
2025 2024
Bagian lancar: Current portion:
Pajak penghasilan badan 42,417 36,512 Corporate income tax
Pajak lain-lain: Other taxes:
Pajak Pertambahan Nilai 622 3,498 Value Added Tax
Lain-lain 616 2,940 Others
Sub-jumlah 1,238 6,438 Sub-total
Bagian tidak lancar: Non-current portion:
Pajak Pertambahan Nilai 5,905 5,931 Value Added Tax
Jumlah 49,560 48,881 Total
b. Beban pajak penghasilan b. Income tax expense
30 Juni/ 30 Juni/
June June
2025 2024
Perusahaan The Company
Pajak penghasilan kini - - Current income tax
Beban pajak tangguhan - - Deferred tax expense
Sub-jumlah - - Sub-total
Entitas anak Subsidiaries
Pajak penghasilan kini 83,063 74,832 Current income tax
Penyesuaian beban Adjustment in respect of
pajak kini tahun lalu - - prior year’s current income tax
(Pendapatan)/beban Deferred tax (income)/
pajak tangguhan (12,850) (5,436) expense
Sub-jumlah 70,213 69,396 Sub-total
Jumlah 70,213 69,396 Total
Pajak atas laba sebelum pajak penghasilan The tax on consolidated profit before income tax
konsolidasian berbeda dengan jumlah teoritis yang differs from the theoretical amount that would arise
dihitung menggunakan rata-rata tertimbang tarif using the weighted average tax rate applicable to
pajak yang berlaku atas laba masing-masing profit of the consolidated subsidiaries as follows:
entitas anak yang dikonsolidasi sebagai berikut:
30 Juni/ 30 Juni/
June June
2025 2024
Laba sebelum pajak penghasilan Consolidated profit before
konsolidasian 152,344 143,060 income tax
Pajak dihitung dengan tarif pajak Tax calculated at applicable
yang berlaku 52,560 48,641 tax rate
Beban yang tidak dapat dikurangkan
menurut pajak 17,653 20,755 Non-deductible expenses
Penyesuaian atas pajak penghasilan Adjustment of prior year’s
badan tahun lalu - - corporate income tax
Beban pajak penghasilan konsolidasian 70,213 69,396 Consolidated income tax expense
Rekonsiliasi antara laba sebelum pajak The reconciliation between the consolidated profit
penghasilan konsolidasian dengan estimasi before income tax and estimated consolidated
taxable income is as follows:
115
Page 118
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
penghasilan kena pajak konsolidasian adalah
sebagai berikut:
30 Juni/ 30 Juni/
June June
2025 2024
Laba sebelum pajak penghasilan
konsolidasian 152,344 143,060 Consolidated profit before income tax
Dikurangi: Less:
Laba sebelum pajak penghasilan - Profit before income tax -
Entitas anak (153,840) (144,845) Subsidiaries
Penyesuaian jurnal eliminasi Adjustment of elimination
pada konsolidasi 5,000 - entries on consolidation
Laba sebelum pajak penghasilan - Profit before income tax -
Perusahaan 3,504 (1,785) the Company
Koreksi fiskal - Fiscal correction
Estimasi rugi fiskal - Perusahaan 3,504 (1,785) Estimated fiscal loss - the Company
Pajak penghasilan kini - Entitas anak 83,063 74,832 Current income tax - Subsidiaries
Pajak penghasilan kini - Konsolidasian 83,063 74,832 Current income tax - Consolidated
Pada tanggal 30 Juni 2025 dan 2024, Perusahaan As at 30 June 2025 and 2024, the Company did not
tidak mengakui aset pajak tangguhan atas rugi recognise deferred tax assets for the fiscal losses
fiskal karena adanya ketidakpastian mengenai because there is uncertainty regarding the availability
ketersediaan laba kena pajak di masa depan untuk of future taxable profits against which the deferred tax
dapat memanfaatkan aset pajak tangguhan. assets can be utilised.
Perhitungan Pajak Penghasilan Badan untuk Corporate Income Tax computations for the years
tahun-tahun yang berakhir pada tanggal ended 30 June 2025 and 2024 are used as the basis
30 Juni 2025 dan 2024 digunakan sebagai dasar for completing the Corporate Income Tax Returns
dalam pengisian Surat Pemberitahuan Tahunan submitted to the tax authorities in the respective
Pajak Penghasilan Badan yang disampaikan countries.
kepada otoritas perpajakan di masing-masing
negara.
c. Liabilitas pajak tangguhan c. Deferred tax liabilities
116
Page 119
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
30 Juni/June 2025
Penambahan Dikreditkan pada
sehubungan penghasilan
dengan akuisisi Dikreditkan/ komprehensif
entitas anak/ (dibebankan) lainnya/
Saldo awal/ Addition related pada laba rugi/ Credited to other Saldo akhir/
Beginning to acquisition Credited (charged) comprehensive Reklasifikasi/ Ending
balance of subsidiary to profit or loss income Reclassification balance
Entitas anak Subsidiaries
Aset pajak tangguhan Deferred tax assets
Penyisihan imbalan Provision for long-term
kerja jangka panjang 5,032 - 467 (86) - 5,413 employee benefits
Penyisihan atas Provision for inventory
persediaan usang 644 - - - - 644 obsolescence
Saldo make-up PLN make-up account
account PLN 7,883 - (287) - - 7,596 balances
Liabillitas sewa 2,369 - (293) - - 2,076 Lease liabilities
Sub-jumlah 15,928 - (113) (86) - 15,729 Sub-total
Liabilitas pajak tangguhan Deferred tax liabilities
Aset tetap (310,242) - 9,735 - - (300,507) Property, plant and equipment
Piutang sewa pembiayaan (123,572) - 1,680 - - (121,892) Finance lease receivable
Properti yang belum
dikembangkan (301,002) - - - - (301,002) Undeveloped properties
Biaya ditangguhkan (4,672) - 326 - - (4,346) Deferred charges
Aset keuangan derivatif (2,294) - - 110 - (2,184) Derivative financial assets
Aset hak guna (2,351) - 353 - - (1,998) Right-of-use assets
Kontrak pelanggan (16,775) - 361 - - (16,414) Customer contract
Lain-lain (1,101) - 508 - - (593) Others
Sub-jumlah (762,009) - 12,963 110 - (748,936) Sub-total
Liabilitas pajak Deferred tax
tangguhan, bersih (746,081) - 12,850 24 - (733,207) liabilities, net
31 Desember/December 2024
Penambahan Dikreditkan pada
sehubungan penghasilan
dengan akuisisi Dikreditkan/ komprehensif
entitas anak/ (dibebankan) lainnya/
Saldo awal/ Addition related pada laba rugi/ Credited to other Saldo akhir/
Beginning to acquisition Credited (charged) comprehensive Reklasifikasi/ Ending
balance of subsidiary to profit or loss income Reclassification balance
Entitas anak Subsidiaries
Aset pajak tangguhan Deferred tax assets
Penyisihan imbalan Provision for long-term
kerja jangka panjang 4,154 - 797 81 - 5,032 employee benefits
Penyisihan atas Provision for inventory
persediaan usang 644 - - - - 644 obsolescence
Saldo make-up PLN make-up account
account PLN 7,540 - 343 - - 7,883 balances
Liabillitas sewa 932 - 1,437 - - 2,369 Lease liabilities
Sub-jumlah 13,270 - 2,577 81 - 15,928 Sub-total
Liabilitas pajak tangguhan Deferred tax liabilities
Aset tetap (281,530) (4,768) (848) - (23,096) (310,242) Property, plant and equipment
Piutang sewa pembiayaan (126,605) - 3,033 - - (123,572) Finance lease receivable
Properti yang belum
dikembangkan (324,098) - - - 23,096 (301,002) Undeveloped properties
Biaya ditangguhkan (4,933) - 261 - - (4,672) Deferred charges
Aset keuangan derivatif - (2,371) - 77 - (2,294) Derivative financial assets
Aset hak guna (893) - (1,458) - - (2,351) Right-of-use assets
Kontrak pelanggan - (17,316) 541 - - (16,775) Customer contract
Lain-lain (1,673) - 572 - - (1,101) Others
Sub-jumlah (739,732) (24,455) 2,101 77 - (762,009) Sub-total
Liabilitas pajak Deferred tax
tangguhan, bersih (726,462) (24,455) 4,678 158 - (746,081) liabilities, net
d. Administrasi d. Administration
Berdasarkan Undang-Undang Perpajakan yang Under the taxation laws of Indonesia, several
berlaku di Indonesia, beberapa anak-anak subsidiaries within the Group, which are Indonesian
perusahaan dalam Grup, yang merupakan Wajib Taxpayers, calculate and pay tax on the basis of
Pajak dalam negeri Indonesia, menghitung dan self assessment. The Directorate General of Taxes
membayar sendiri besarnya jumlah pajak yang (“DGT”) may assess or amend taxes within five
terutang. Direktorat Jenderal Pajak (“DJP”) dapat years of when the tax becomes due.
menetapkan atau mengubah pajak dalam batas
waktu lima tahun saat terutangnya pajak.
117
Page 120
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Kontraktor JOC menyampaikan pengembalian The JOC contractor submits tax returns on the
pajak atas dasar self-assessment. Sesuai dengan basis of self-assessment. In accordance with the
amendemen terakhir tentang perpajakan umum latest amendments of the general taxation and
dan hukum acara, yang mulai berlaku pada procedural law, which became effective on
1 Januari 2018, kantor pajak dapat menetapkan 1 January 2018, the tax office may assess or
atau mengubah pajak dalam waktu lima tahun amend taxes within five years from the date the tax
sejak tanggal terutangnya pajak. becomes payable.
e. Tarif pajak e. Tax rates
Perusahaan The Company
Perusahaan Terbuka yang memenuhi syarat- Publicly Listed Companies that fulfil certain
syarat tertentu dapat memperoleh tarif 3% lebih requirements are entitled to obtain a rate 3% lower
rendah dari tarif Pajak Penghasilan (“PPh”) Badan than the applicable Corporate Income Tax (“CIT”)
yang berlaku. Dalam hal Perusahaan memenuhi rate. In the event that the Company fulfils the
syarat-syarat tersebut, Perusahaan dapat requirements, the Company can obtain a lower CIT
memperoleh tarif PPh Badan lebih rendah untuk rate for the relevant Fiscal Year.
Tahun Pajak yang bersangkutan.
Pada tanggal 29 Oktober 2021, Presiden Republik On 29 October 2021, the President of the Republic
Indonesia telah mengesahkan Undang-Undang of Indonesia has ratified the law No. 7 Year 2021
No. 7 Tahun 2021 tentang Harmonisasi Peraturan as Harmonisation of Taxation Regulations (the
Perpajakan (“UU HPP”). UU HPP tarif pajak “HPP Law”). The HPP Law the corporate income
penghasilan badan bagi Wajib Pajak Badan dan tax rate for Corporate Taxpayers and Permanent
Bentuk Usaha Tetap sebesar 22% berlaku mulai Establishments remains at 22% effective from 2022
Tahun Pajak 2022. Fiscal Year.
Anak perusahaan yang beroperasi di bawah JOC Subsidiaries operating under JOCs
Anak perusahaan utama Grup beroperasi dan The Group’s main subsidiaries operate and earn
memperoleh pendapatan dari operasi panas bumi income from geothermal and power plant
dan pembangkit listrik di Indonesia. Berdasarkan operations in Indonesia. Under the JOCs, the
JOC, laba entitas anak utama Grup dikenakan Group’s main subsidiaries’ profit is subject to
pajak penghasilan sebesar 34% dari penghasilan income tax at 34% of taxable income of the
kena pajak masing-masing entitas anak. respective subsidiaries.
Biaya yang tidak dapat dikurangkan terutama Non-deductible expenses mainly comprise interest
terdiri dari biaya bunga dan biaya korporasi lainnya expense and other corporate costs incurred by
yang dikeluarkan oleh entitas yang memiliki entities holding interests in the JOCs. Income tax
kepentingan di JOC. Perhitungan pajak calculations are based on estimated taxable
penghasilan didasarkan pada taksiran penghasilan income and amounts may be adjusted when tax
kena pajak dan jumlahnya dapat disesuaikan returns are filed with the respective tax authority.
ketika Surat Pemberitahuan Pajak diajukan kepada
otoritas pajak masing-masing.
Entitas anak lainnya Other subsidiaries
Entitas anak lainnya dalam Grup adalah wajib The other subsidiaries within the Group are
pajak Singapura, Belanda dan Indonesia yang Singapore, Netherlands and Indonesia tax
dikenakan pajak penghasilan masing-masing residents which are subject to income tax at 17%
sebesar 17% (2024: 17%), 25,8% (2024: 25,8%) (2024: 17%), 25.8% (2024: 25.8%) and 22%,
dan 22% dan oleh karena itu wajib menyampaikan respectively and hence file tax returns with the
kepada otoritas pajak Singapura, Belanda dan Singapore, Netherlands and Indonesia tax
Indonesia. Tidak ada beban pajak penghasilan kini authorities. There was no current income tax
yang dikeluarkan untuk entitas anak Singapura dan expense incurred for the Singapore and
Belanda untuk tahun-tahun yang berakhir pada Netherlands subsidiaries during the years ended
tanggal 30 Juni 2025 dan 31 Desember 2024. 30 June 2025 and 31 December 2024.
Grup adalah entitas anak dari sebuah Multinational The Group is a subsidiary of a Multinational
Enterprise (”MNE”) grup, PT Barito Pacific Tbk. Enterprise (“MNE”) group, PT Barito Pacific Tbk.
PT Barito Pacific Tbk adalah Entitas Induk Utama PT Barito Pacific Tbk is the Group’s Ultimate
(”UPE”) Grup. Parent Entity (“UPE”).
Peraturan Menteri Keuangan No. PMK-136 Tahun The Ministry of Finance Regulation No. PMK-136
2024 (PMK-136) tentang Implementasi Global Anti- Year 2024 (PMK-136) regarding the
118
Page 121
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Base Erosion (GloBE) atau Pajak Minimum Global Implementation of Global Anti-Base Erosion
Pilar II (”Pilar Dua”) telah diberlakukan di Indonesia, (GloBE) rules or Pillar II Global Minimum Tax
yurisdiksi di mana Perusahaan dan UPE didirikan, (“Pillar Two”) was enacted in Indonesia, the
dan mulai berlaku pada 1 Januari 2025. Di bawah jurisdiction in which the Company and UPE are
aturan ini, top-up pajak akan muncul di mana tarif incorporated and came into effect from 1 January
pajak efektif dari operasi UPE di yurisdiksi individu 2025. Under these rules, a top-up tax will arise
mana pun, dihitung menggunakan prinsip-prinsip where the effective tax rate of the UPE’s operations
yang ditetapkan dalam undang-undang Pilar Dua, in any individual jurisdictions, calculated using
yaitu di bawah 15%. Oleh karena PMK-136 belum principles set out in the Pillar Two legislation, is
efektif pada tanggal pelaporan, Grup tidak memiliki below 15%. Since the PMK-136 was not effective
dampak pajak kini terkait. Grup menerapkan at the reporting date, the Group has no related
pengecualian atas pengakuan dan pengungkapan current tax exposure. The Group applies the
informasi mengenai aset dan liabilitas pajak exception on recognition and disclosure of
tangguhan terkait dengan pajak penghasilan Pilar information about deferred tax assets and liabilities
Dua, sebagaimana diatur dalam amandemen related to Pillar Two income taxes, as provided in
PSAK 212 yang diterbitkan pada Desember 2023. the amendments to PSAK 212 issued in December
2023.
Grup tidak berekspektasi terdapat eksposur The Group does not expect a material exposure to
material terhadap pajak penghasilan Pilar Dua atas the Pillar Two income taxes to these consolidated
laporan keuangan konsolidasian ini. financial statements.
Manajemen dari UPE secara berkelanjutan menilai Management of UPE is continuing to assess the
dampak peraturan pajak penghasilan Pilar Dua impact of the Pillar Two income taxes legislation on
terhadap kinerja keuangan di masa depan. its future financial performance.
26. TRANSAKSI DAN SALDO DENGAN PIHAK 26. TRANSACTIONS AND BALANCES WITH RELATED
BERELASI PARTIES
a. Sifat hubungan a. Nature of relationships
Pihak berelasi/ Sifat hubungan/ Jenis transaksi/
Related party Nature of relationship Type of transaction
Barito Pacific Induk Perusahaan/ Pemegang saham/Shareholders
Parent of the Company
PT Griya Idola Entitas sepengendali dengan Piutang lain-lain/Other receivables
Perusahaan/Under common Beban sewa kantor dan utang sewa/
control with the Company Office rental expense and lease liabilities
Personil manajemen kunci/ Direksi dan Komisaris Kompensasi/Compensation
Key management personnel Perusahaan/Board of
Directors and Board of
Commissioners of the
Company
b. Rincian transaksi dan saldo b. Details of transactions and balances
Saldo dengan pihak berelasi pada tanggal Balances with related parties as at 30 June 2025
30 Juni 2025 dan 31 Desember 2024 dirinci di and 31 December 2024 are detailed below:
bawah ini:
30 Juni/ 31 Desember/
June December
2025 2024
Liabilitas sewa dan beban yang Lease liabilities and
masih harus dibayar accrued expenses
PT Griya Idola 4,906 5,258 PT Griya Idola
Persentase terhadap total liabilitas 0.17% 0.17% As a percentage of total liabilities
Selain informasi pihak berelasi yang diungkapkan In addition to the related party information
di bagian lain dalam laporan keuangan disclosed elsewhere in these consolidated financial
konsolidasian ini, transaksi signifikan berikut antara statements, the following significant transactions
Grup dan pihak berelasi terjadi sesuai dengan between the Group and the related parties took
persyaratan yang disepakati antara para pihak place at terms agreed between the parties during
selama tahun-tahun yang berakhir pada tanggal the years ended 30 June 2025 and 31 December
30 Juni 2025 dan 31 Desember 2024: 2024:
119
Page 122
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
30 Juni/ 31 Desember/
June December
2025 2024
Penyusutan aset hak guna Depreciation of right-of-use assets
dan akresi bunga atas and accretion of interest on
liabilitas sewa lease liabilities
PT Griya Idola 805 1,129 PT Griya Idola
Persentase terhadap total beban 0.56% 0.38% As a percentage of total expenses
c. Kompensasi manajemen kunci c. Key management compensation
Kompensasi yang dibayar atau terutang pada The compensation paid or payable to key
manajemen kunci atas jasa kepegawaian untuk management for employee services for the year
tahun yang berakhir pada tanggal 30 Juni 2025 ended 30 June 2025 are as follows
adalah sebagai berikut (31 Desember 2024: (31 December 2024: management compensation
seluruh kompensasi manajemen kunci Perusahaan was borne by the shareholders of the Company and
dibayarkan oleh pemegang saham Perusahaan was not charged back to the Company):
dan tidak ditagihkan kepada Perusahaan):
30 Juni/June 2025
Direksi dan personel
manajemen kunci
lainnya/Board of
Directors and other key Dewan Komisaris/Board of
management personnel Commissioners
%* AS$/US$ % AS$/US$
Gaji dan imbalan Salary and
karyawan jangka pendek other short-term
lainnya 8.1 1,758 1.8 380 employee benefits
30 Juni/June 2024
Direksi dan personel
manajemen kunci
lainnya/Board of
Directors and other key Dewan Komisaris/Board of
management personnel Commissioners
%* AS$/US$ % AS$/US$
Gaji dan imbalan Salary and
karyawan jangka pendek other short-term
lainnya 8.0 1,753 0.6 352 employee benefits
* persentase terhadap jumlah beban imbalan kerja/percentage to total employee benefit expense.
27. LABA PER SAHAM DASAR DAN DILUSIAN 27. BASIC AND DILUTED EARNINGS PER SHARE
30 Juni/ 30 Juni/
June June
2025 2024
Laba konsolidasian untuk Consolidated profit
tahun berjalan yang for the year attributable
dapat diatribusikan kepada to the owners of
pemilik entitas induk 65,466 57,953 the parent entity
Rata-rata tertimbang jumlah Weighted average number of
saham biasa yang beredar ordinary shares outstanding
(dalam lembar saham) 133,783,472,486 133,786,220,000 (in shares)
Laba per saham dasar dan Basic and diluted earnings per
dilusian yang dapat diatribusikan share attributable to the
kepada pemilik entitas induk - owners of the parent entity -
(nilai penuh) 0.00049 0.00043 (full amount)
Perusahaan tidak memiliki saham yang berpotensi The Company does not have any potentially dilutive
dilusi, sehingga laba per saham dasar sama dengan shares, therefore the diluted earnings per share is equal
laba per saham dilusian. to the basic earnings per share.
120
Page 123
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
28. ASET DAN LIABILITAS MONETER NETO DALAM 28. NET MONETARY ASSETS AND LIABILITIES
MATA UANG ASING DENOMINATED IN FOREIGN CURRENCIES
Pada tanggal 30 Juni 2025 dan 31 Desember 2024, As at 30 June 2025 and 31 December 2024, the Group
Grup memiliki aset dan liabilitas moneter dengan mata had monetary assets and liabilities denominated in
uang selain Dolar AS, sebagai berikut: currencies other than US Dollars, as follows:
30 Juni/June 2025 31 Desember/December 2024
Mata Uang Mata Uang
selain Dolar selain Dolar
AS/ Ekuivalen AS/ Ekuivalen
Currencies AS$ Currencies AS$
other than Equivalent other than Equivalent
US Dollars US$ US Dollars US$
Aset Assets
Kas dan setara kas IDR 77,578,313 4,779 160,440,174 9,927 Cash and cash equivalents
Others 1,899,491 149 536,370 45
Kas dan deposito berjangka
yang dibatasi Restricted cash and
penggunaannya IDR 871,697,047 53,699 721,083,792 44,616 time deposits
Piutang usaha dan lain-lain IDR 639,631,260 39,403 1,005,029,843 62,185 T rade and other receivables
Jumlah Aset 98,030 116,773 T otal Assets
Liabilitas Liabilities
Utang usaha IDR 118,808,059 7,319 84,415,174 5,223 T rade payables
Utang lain-lain IDR 47,480,122 2,925 41,777,920 2,585 Other payables
Utang pajak IDR 123,562,480 7,612 107,179,257 6,632 T axes payable
Beban yang masih
harus dibayar IDR 418,597,609 25,787 263,394,565 16,297 Accrued expenses
Others 112
Liabilitas sewa IDR 101,683,512 6,264 112,613,373 6,968 Lease liabilities
Pinjaman IDR 1,346,512,704 128,368 2,031,146,677 125,673 Borrowings
Liabilitas imbalan Post-employment
pasca-kerja IDR 293,144,510 18,059 272,089,902 16,835 benefits obligation
Jumlah Liabilitas 196,334 180,325 T otal Liabilities
(Liabilitas) aset moneter bersih (98,304) (63,552) Net monetary (liabilities) assets
Aset dan liabilitas moneter di atas dijabarkan Monetary assets and liabilities mentioned above are
menggunakan kurs tengah penutupan Bank Indonesia translated using the Bank Indonesia closing rate as at
pada tanggal pelaporan. the reporting date.
Apabila aset dan liabilitas dalam mata uang selain Dolar If assets and liabilities in currencies other than
AS pada tanggal 30 Juni 2025 dijabarkan dengan US Dollars as at 30 June 2025 are translated using the
menggunakan kurs yang berlaku pada tanggal exchange rate as at the date of completion of these
penyelesaian laporan keuangan konsolidasian ini, consolidated financial statements, the total net
liabilitas moneter neto akan naik sekitar AS$46 (31 monetary liabilities will increase by approximately
Desember 2024: AS$853). US$46 (31 December 2024: US$853).
29. INFORMASI ARUS KAS 29. CASH FLOW INFORMATION
Berikut ini adalah transaksi non-kas Grup: The following are the Group's non-cash transactions:
30 Juni/ 30 Juni/
June June
2025 2024
Transfer aset dalam penyelesaian ke Transfer construction in progress to
piutang sewa pembiayaan 43,713 - finance lease receivables
Penerbitan saham baru melalui konversi Issuing new shares through other
utang lain-lain 11,623 - payables conversion
Penghapusan utang usaha 890 - Write-off trade payable
Penambahan aset hak guna melalui Additions of right-of-use assets
sewa - 6,279 through leases
Penambahan beban keuangan yang
ditangguhkan melalui beban yang Addition of deferred financing costs
masih harus dibayar - 905 through accrued expenses
121
Page 124
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
30. SEGMEN OPERASI 30. OPERATING SEGMENTS
Segmen operasi disusun sesuai dengan kebijakan The operating segment information is prepared using
akuntansi yang dianut dalam penyusunan dan the accounting policies adopted for preparing and
penyajian laporan keuangan konsolidasian. presenting the consolidated financial statements.
Berdasarkan informasi keuangan yang digunakan oleh Based on the financial information used by the chief
pengambil keputusan operasional dalam mengevaluasi operating decision-maker in evaluating the performance
kinerja segmen dan menentukan alokasi sumber daya of segments and in the allocation of resources,
yang dimilikinya, manajemen menetapkan segmen management considers the Group’s segments based
Grup berdasarkan operasi JOC. Seluruh transaksi antar on the operating JOCs. All transactions between
segmen telah dieliminasi. segments have been eliminated.
Dalam hal segmen geografis, seluruh pendapatan In terms of geographical segments, all revenues are
berasal dari, dan aset signifikan berlokasi di Indonesia. derived from, and significant assets are located in,
Indonesia.
Untuk tujuan pelaporan manajemen, pada tanggal For management reporting purposes, as at
30 Juni 2025 dan 2024, Grup dibagi ke dalam operasi 30 June 2025 and 2024, the Group is divided into the
JOC. Operasi JOC menjadi dasar pelaporan informasi operating JOCs. The operating JOCs are the basis on
segmen Grup, dengan rincian sebagai berikut: which the Group reports segment information, with the
following details:
30 Juni/June 2025
Jumlah
sebelum Jumlah
eliminasi/ konsolidasian/
Lainnya/ Total before Eliminasi/ Total
Salak Darajat Wayang Windu Sidrap Others elimination Elimination consolidated
PENDAPATAN DAN HASIL SEGMENT REVENUE
SEGMEN AND RESULTS
Pendapatan dari kontrak dengan Revenue from contracts with
pelanggan 104,895 67,424 22,407 7,971 3,555 206,252 (3,533) 202,719 customers
Pendapatan sewa operasi - - 76,564 - - 76,564 76,564 Operating lease income
Pendapatan sewa pembiayaan 8,759 12,031 - - - 20,790 20,790 Finance leas e income
Beban pokok pendapatan - - - - (3,302) (3,302) 3,302 - Cost of revenue
Beban usaha (29,853) (25,788) (29,667) (4,993) (4,552) (94,853) 260 (94,593) Operating expenses
Beban keuangan (13,237) (9,982) (14,306) (2,150) (25,958) (65,633) 6,841 (58,792) Finance costs
(Kerugian)/keuntungan kurs mata (Loss)/gain on foreign
uang asing, bersih 175 21 (363) (8) (222) (397) (397) exchange, net
Pendapatan bunga 1,610 1,039 8,031 226 1,791 12,697 (6,841) 5,856 Interest income
(Kerugian)/keuntungan
lain-lain, bersih 69 93 (182) (2) 16 (6) 203 197 Other (losses)/gains, net
Laba sebelum pajak penghasilan 72,418 44,838 62,484 1,044 (28,672) 152,112 232 152,344 Profit before income tax
Beban pajak penghasilan (28,729) (18,331) (23,561) (111) 2 (70,730) 517 (70,213) Income tax expense
Laba tahun berjalan 43,689 26,507 38,923 933 (28,670) 81,382 749 82,131 Profit for the year
ASET DAN LIABILITAS SEGMENT ASSETS
SEGMEN AND LIABILITIES
Aset segmen 1,264,207 891,263 823,224 132,167 4,925,444 8,036,305 (4,264,586) 3,771,719 Segment assets
Liabilitas segmen 692,294 528,226 557,001 93,604 2,188,040 4,059,165 (1,102,275) 2,956,890 Segment liabilities
Depreciation and amortisation
Beban penyusutan dan amortisas i (13,344) (13,560) (14,979) (3,338) (2,767) (47,988) 260 (47,728) expense
122
Page 125
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
30 June/Juni 2024
Jumlah
sebelum Jumlah
eliminasi/ konsolidasian/
Lainnya/ Total before Eliminasi/ Total
Salak Darajat Wayang Windu Others elimination Elimination consolidated
PENDAPATAN DAN HASIL SEGMENT REVENUE
SEGMEN AND RESULTS
Pendapatan dari kontrak dengan Revenue from contracts with
pelanggan 107,073 56,117 22,738 9,995 195,923 (3,363) 192,560 customers
Pendapatan sewa operasi - - 77,695 - 77,695 - 77,695 Operating lease inc ome
Pendapatan sewa pembiayaan 7,472 12,345 - - 19,817 - 19,817 Finance lease income
Beban pokok pendapatan - - - (3,143) (3,143) 3,143 - Cost of revenue
Beban usaha (28,487) (20,916) (29,832) (5,025) (84,260) 260 (84,000) Operating expenses
Beban keuangan (13,662) (10,307) (16,160) (35,023) (75,152) 7,232 (67,920) Finance costs
(Kerugian)/keuntungan kurs mata (Loss)/gain on foreign
uang asing, bersih (184) (950) (43) 658 (519) - (519) exchange, net
Pendapatan bunga 2,354 1,806 9,179 1,451 14,790 (7,232) 7,558 Interest income
(Kerugian)/keuntungan
lain- lain, bersih 3 49 (184) (2,176) (2,308) 177 (2,131) Other (losses)/gains, net
Laba sebelum pajak penghasilan 74,569 38,144 63,393 (33,263) 142,843 217 143,060 Profit before income tax
Beban pajak penghasilan (29,143) (15,824) (23,811) (530) (69,308) (88) (69,396) Income tax expense
Laba tahun berjalan 45,426 22,320 39,582 (33,793) 73,535 129 73,664 Profit for the year
ASET DAN LIABILITAS SEGMENT ASSETS
SEGMEN AND LIABILITIES
Aset segmen 1,253,068 888,138 847,983 5,421,949 8,411,138 (4,707,424) 3,703,714 Segment assets
Liabilitas segmen 719,523 543,663 597,693 2,249,811 4,110,690 (1,107,191) 3,003,499 Segment liabilities
Depreciation and amortisation
Beban penyusutan dan amortisasi (11,929) (9,058) (15,053) (1,164) (37,204) 260 (36,944) expense
31. PERJANJIAN SIGNIFIKAN, IKATAN DAN 31. SIGNIFICANT AGREEMENTS, COMMITMENTS AND
KONTINJENSI CONTINGENCIES
a. Klaim audit pemerintah a. Government audit claims
Kebijakan akuntansi entitas anak perusahaan The accounting policies of the Group's subsidiaries
Grup tunduk pada ketentuan dalam JOC. Setiap are subject to the provisions of the JOC. Annually,
tahun, catatan akuntansi dan laporan entitas anak the accounting records and reports of the
Grup yang beroperasi berdasarkan JOC diaudit subsidiaries of the Group operating under JOCs
oleh PGE dan/atau pemerintah. Temuan yang are subjected to an audit by PGE and/or the
timbul dari audit ini disetujui oleh manajemen Grup government. Findings arising from these audits are
dan dicatat dalam catatan akuntansinya, atau either agreed upon by management of the Group
diperdebatkan. Penyelesaian temuan yang and recorded in its accounting records, or are
disengketakan mungkin memerlukan proses disputed. Resolution of disputed findings may
negosiasi yang panjang selama beberapa tahun. require a lengthy negotiation process extending
over a number of years.
SEGWWL SEGWWL
Pada tanggal penyelesaian laporan keuangan As of the completion date of these consolidated
konsolidasi ini, SEGWWL memiliki berbagai financial statements, SEGWWL has various audit
temuan audit dari auditor Pemerintah untuk findings from the Government auditors for the
periode 2008-2018 sebesar AS$6.128 terkait period from 2008-2018 amounting to US$6,128
overhead perusahaan induk (“PCO”) dan relating to parent company overhead (“PCO”) and
AS$17.552 terkait temuan lainnya. US$17,552 relating to other findings.
Sehubungan dengan temuan auditor Pemerintah With regards to the other findings of the
lainnya, DJA menerbitkan Surat Kurang Bayar Government auditors, the DGB issued an
setoran bagian Pemerintah periode 2013-2018 underpayment of the Government share letter for
sebesar AS$1.688 saja yang telah dibayarkan oleh the period from 2013-2018 totalling US$1,688 only
SEGWWL. Jika temuan yang tersisa akan which has been paid by SEGWWL. If the remaining
terwujud, beban pajak penghasilan akan findings materialise, the income tax expense will
meningkat sebesar AS$949. increase by US$949.
Berikut rincian hasil pemeriksaan yang dilakukan The following are the details of the results of the
oleh Pemeriksa Pemerintah atas setiap tahun audits conducted by the Government auditors for
anggaran: each fiscal year:
123
Page 126
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Sampai dengan Audit 2012 Up to Audit 2012
Pada tanggal 30 Juni 2025, SEGWWL memiliki As of 30 June 2025, SEGWWL has various
berbagai temuan Badan Pengawasan Keuangan outstanding Finance and Development
dan Pembangunan (“BPKP”) yang belum Supervisory Agency (“BPKP”) findings totalling
diselesaikan dengan total AS$15.780 untuk US$15,780 for the periods up to financial year
periode sampai dengan tahun buku yang berakhir ended 31 December 2012, but BPKP did not
pada tanggal 31 Desember 2012 tetapi BPKP tidak declare these findings, which will result in
mengumumkan temuan tersebut, yang akan underpayment of the Government share. If they
mengakibatkan kurang bayar bagian Pemerintah. materialise, the impact of these findings will
Jika terwujud, dampak dari temuan ini akan increase the Government share and production
meningkatkan bagian Pemerintah dan tunjangan allowance to PGE by US$5,152 and US$631,
produksi untuk PGE masing-masing sebesar respectively.
AS$5.152 dan AS$631.
SEGWWL berkeyakinan bahwa temuan audit SEGWWL believes that the 2012 audit findings are
untuk tahun 2012 tidak berdasar, oleh karena itu without merit, therefore no accrual has been
tidak ada biaya yang masih harus dibayar yang recognised in the consolidated financial statements
dicatat dalam laporan keuangan konsolidasian in relation to the outstanding findings.
sehubungan dengan temuan yang belum
terselesaikan.
Audit 2013-2014 2013-2014 audit
Pada tanggal 26 Mei 2016, BPKP mengeluarkan On 26 May 2016, the BPKP issued its 2013-2014
laporan audit 2013-2014 dengan total temuan audit report with findings totalling US$3,762. Most
AS$3.762. Sebagian besar temuan berkaitan of the findings pertained to the dispute over the
dengan sengketa tentang jumlah PCO dan jumlah amount of the PCO and the amount of expenses
biaya yang tidak boleh dikurangkan, dengan that should not be deductible, with total amount of
jumlah masing-masing sebesar AS$1.575 dan US$1,575 and US$2,187, respectively.
AS$2.187.
Namun, kesimpulan dari laporan audit BPKP However, the conclusion of the BPKP audit report
menyatakan bahwa kekurangan pembayaran stated that underpayment of the Government
bagian Pemerintah hanya sebesar AS$714, yang share is only amounted to US$714, which
merupakan 34% dari biaya yang tidak dapat represents 34% of the non-deductible expenses of
dikurangkan sebesar AS$2.187. BPKP tidak US$2,187. BPKP did not state that PCO findings
menyebutkan temuan PCO mengakibatkan resulted in underpayment of the Government
kurang bayar bagian Pemerintah. share.
Pada tanggal 5 September 2016, SEGWWL On 5 September 2016, SEGWWL received a
menerima surat pemberitahuan dari DJA notification letter from the DGB in relation to the
sehubungan dengan laporan audit tersebut audit report with a total underpayment of
dengan total kurang bayar bagian Pemerintah Government share amounting to US$1,250, which
sebesar AS$1.250, lebih tinggi AS$536 dari was higher by US$536 than the underpayment of
kurang bayar bagian Pemerintah sebagaimana the Government share stated in the BPKP audit
tercantum dalam laporan audit BPKP. report.
Pada tanggal 1 Desember 2016, SEGWWL On 1 December 2016, SEGWWL submitted an
mengajukan surat keberatan kepada DJA atas objection letter to the DGB with regards to the
surat pemberitahuan kurang bayar tersebut. Untuk underpayment notification letter. To be able to
dapat melanjutkan proses keberatan, pada proceed with the objection process, on
tanggal 2 Desember 2016, SEGWWL membayar 2 December 2016, SEGWWL paid the
kekurangan pembayaran bagian Pemerintah underpayment of the Government share
sebesar AS$1.250 kepada DJA dan mengajukan amounting to US$1,250 to the DGB and submitted
surat keberatan. an objection letter.
Pada tanggal 26 Januari 2018, SEGWWL On 26 January 2018, SEGWWL received a
menerima surat keputusan dari Kemenkeu Surat decision letter from the MoF Letter
No. S-13/MK.2/2018 yang menolak keberatan No. S-13/MK.2/2018 rejecting SEGWWL’s
SEGWWL (“Surat Keputusan”). objections (the “Decision Letter”).
124
Page 127
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Tahap keberatan Objection stage
Pada tanggal 25 April 2018, SEGWWL On 24 April 2018, SEGWWL filed a claim against
mengajukan gugatan kepada Kemenkeu di the MoF at the Jakarta State Administrative Court
Pengadilan Tata Usaha Negara (“PTUN”) Jakarta (“PTUN”) to dispute the decision letter.
untuk menggugat surat keputusan tersebut.
Pada tanggal 26 November 2018, PTUN On 26 November 2018, PTUN pronounced the
mengumumkan putusan yang memenangkan verdicts in favour of SEGWWL. The verdicts are as
SEGWWL. Putusannya adalah sebagai berikut: follows:
1) Mengabulkan semua gugatan 1) Grant all of the lawsuits
a. Kemenkeu tidak berwenang memungut a. The MoF has no authority to collect the
Penerimaan Negara Bukan Pajak Non-tax State Revenue (“PNBP”);
(“PNBP”);
b. Kemenkeu tidak berwenang meminta b. The MoF has no authority to request an
audit kepada BPKP atas kewajiban PNBP audit to BPKP on SEGWWL’s PNBP
SEGWWL; obligations;
c. Kemenkeu tidak berwenang memutuskan c. The MoF has no authority to decide the
lebih bayar atau kurang bayar PNBP overpayment or underpayment of
SEGWWL berdasarkan hasil audit BPKP; SEGWWL’s PNBP based on BPKP audit
result;
d. Objek sengketa melanggar undang- d. The objects of the dispute violated the
undang PNBP; dan PNBP law; and
e. Objek sengketa bertentangan dengan e. The objects of the dispute were contrary to
prinsip-prinsip umum pemerintahan yang the general principles of good governance.
baik.
2) Menyatakan Surat Keputusan batal dan tidak 2) Declare null and void the decision letter
berlaku.
3) Mewajibkan Kemenkeu untuk mencabut Surat 3) Require the MoF to revoke the decision letter
Keputusan.
4) Kemenkeu membayar seluruh biaya perkara 4) The MoF to pay all of the court fees of
sebesar Rp272.000 – nilai penuh. IDR272,000 – full amount.
Tahap banding Appeal stage
Pada tanggal 6 Februari 2019, Kemenkeu telah On 6 February 2019, the MoF submitted a
mengajukan banding ke Pengadilan Tinggi Tata memorandum of appeal to the State Administrative
Usaha Negara (“PTTUN”) sebagai tanggapan atas High Court (“PTTUN”) in response to the decision
keputusan yang dikeluarkan oleh PTUN tentang issued by PTUN regarding the 2013-2014 audit
laporan audit tahun 2013 - 2014. Pada reports. On 11 April 2019, PTTUN issued its appeal
11 April 2019, PTTUN mengeluarkan putusan decision accepting the exception of the defendant
kasasinya yang menerima eksepsi terdakwa (yaitu; (i.e. MoF) on the absolute competence of the court
Kemenkeu) atas kompetensi absolut pengadilan and declared that the PTUN has no authority to
dan menyatakan bahwa PTUN tidak berwenang adjudicate such a quo case in accordance with
mengadili kasus quo tersebut sesuai dengan UU Law No. 20 year 1997 involving PNBP.
No. 20 tahun 1997 tentang PNBP.
Tahap kasasi Cassation stage
Pada tanggal 23 Mei 2019, SEGWWL mengajukan On 23 May 2019, SEGWWL submitted the
memori kasasi ke Mahkamah Agung dengan dasar memorandum of cassation to the Supreme Court
yang sesuai dengan Surat Edaran Mahkamah on a basis that in accordance with the Supreme
Agung No. 4 tahun 2016 (Surat Edaran Mahkamah Court Circular Letter No. 4 year 2016 (Surat
Agung No. 4/2016) (“SEMA 4 /2016”) menegaskan Edaran Mahkamah Agung No. 4/2016) (“SEMA
bahwa setelah terbitnya Undang-Undang No. 30 4/2016”) emphasised that after the issuance of
Tahun 2014 tentang Tata Usaha Negara, Law No. 30 year 2014 regarding the State
kewenangan penyelesaian sengketa tata usaha Administration, the authority to solve the dispute
negara berada di bawah PTUN, dan bukan related to the state administrative matters would be
PTTUN. Oleh karena itu, SEGWWL keberatan under PTUN, and not PTTUN. Therefore,
dengan keputusan PTTUN pada tahap banding di SEGWWL objected to the PTTUN decision during
atas dan berpendapat bahwa dasar peraturan yang the appeal stage above and believes that the basis
digunakan oleh PTTUN tidak diperbarui. of the regulations used by PTTUN was not up to
date.
125
Page 128
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Pada tanggal 10 Juni 2019, Kemenkeu On 10 June 2019, the MoF submitted a contra
mengajukan kontra memorandum kepada memorandum to the Supreme Court.
Mahkamah Agung.
Pada tanggal 3 Oktober 2019, Mahkamah Agung On 3 October 2019, the Supreme Court issued its
mengeluarkan putusan kasasi No.454 K/TUN/2019 cassation decision No.454 K/TUN/2019 declining
yang menolak permohonan kasasi dari SEGWWL. the cassation request from SEGWWL.
Tahap peninjauan kembali Civil review stage
Pada tanggal 16 Juli 2020, SEGWWL mengajukan On 16 July 2020, SEGWWL submitted a
permohonan peninjauan kembali ke Mahkamah reconsideration request to the Supreme Court. On
Agung. Pada tanggal 21 April 2021, Mahkamah 21 April 2021, the Supreme Court issued its
Agung mengeluarkan putusan No. 21 decision No.21 PK/TUN/2021 declining the
PK/TUN/2021 yang menolak peninjauan kembali memorandum of civil review from SEGWWL.
dari SEGWWL.
Proses pengajuan ulang Resubmission process
Pada tanggal 1 September 2021, SEGWWL On 1 September 2021, SEGWWL re-submitted a
mengajukan kembali gugatan dengan hal yang lawsuit with the same matter (as in the previous
sama (seperti pada proses sebelumnya) ke proceeding) to the PTTUN.
PTTUN.
Pada tanggal 8 Maret 2022, PTTUN mengeluarkan On 8 March 2022, PTTUN issued its verdict
putusannya yang menolak keberatan SEGWWL. rejecting the objection of SEGWWL.
Pada tanggal 1 April 2022, SEGWWL mengajukan On 1 April 2022, SEGWWL submitted its cassation
permohonan kasasi ke Mahkamah Agung untuk request to the Supreme Court appealing the
mengajukan banding atas putusan PTTUN. PTTUN verdict.
Pada tanggal 12 Juli 2022, MA mengeluarkan On 12 July 2022, the Supreme Court issued its
putusan kasasi No.345/K/TUN/2022 menolak cassation decision No.345/K/TUN/2022 rejecting
permohonan kasasi dari SEGWWL, yang salinan the cassation request from SEGWWL, for which a
putusannya diterima pada tanggal 8 September copy of the decision was received on 8 September
2022. 2022.
Menyusul putusan kasasi Mahkamah Agung, Following the Supreme Court cassation decision,
SEGWWL telah mencatat penyisihan penuh untuk SEGWWL has recorded a full provision for
penurunan nilai sebesar AS$1.250 pada tanggal 31 impairment of US$1,250 as of 31 December 2022,
Desember 2022, yang merupakan tambahan which represents an additional provision of
penyisihan sebesar AS$536 di tahun 2022 dari US$536 in 2022 from the provision of US$714 in
penyisihan sebesar AS$714 di tahun 2021, yang 2021, recorded as part of income tax expense in
dicatat sebagai bagian dari beban pajak profit or loss.
penghasilan dalam laba rugi.
Audit 2015 2015 audit
Pada tanggal 15 September 2017, BPKP On 15 September 2017, BPKP issued its 2015
menerbitkan laporan audit tahun 2015 dengan audit report with findings totalling US$2,234. Most
temuan sebesar AS$2.234. Sebagian besar of the findings pertain to the dispute over the
temuan berkaitan dengan perselisihan tentang amount of the PCO and the amount of expenses
jumlah PCO dan jumlah biaya yang seharusnya that should not be deductible recognised by
tidak dapat dikurangkan yang diakui oleh SEGWWL, with a total amount of US$1,286 and
SEGWWL, dengan jumlah masing-masing sebesar US$948, respectively.
AS$1.286 dan AS$948.
Namun, laporan audit BPKP menyatakan bahwa However, the BPKP audit report stated that the
kurang bayar bagian Pemerintah hanya underpayment of the Government share only
merupakan jumlah pengeluaran yang tidak boleh represents the amount of expenses that should not
dikurangkan dan sebesar AS$380. BPKP tidak be deductible amounted to US$380. BPKP did not
menyatakan bahwa temuan PCO harus state that the PCO finding resulted in
berdampak pada bagian Pemerintah. underpayment of the Government share.
126
Page 129
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Sejak SEGWWL berada pada posisi rugi pada Since SEGWWL was in a loss position in 2015,
tahun 2015, temuan ini kemudian diteruskan ke these findings were then carried forward to 2016,
tahun 2016, sebagai koreksi akumulasi rugi pajak as a tax loss carryforward correction amounting to
sebesar AS$380. US$380.
2016 audit 2016 audit
Pada tanggal 1 Juli 2019, BPKP menerbitkan On 1 July 2019, BPKP issued its 2016 audit report
laporan audit 2016 dengan total temuan AS$2.170. with findings totalling US$2,170. Most of the
Sebagian besar temuan berkaitan dengan findings pertain to the dispute over the amount of
sengketa jumlah PCO dan jumlah biaya yang tidak the PCO and other amounts of expenses that
boleh dikurangkan yang diakui oleh SEGWWL, should not be deductible recognised by SEGWWL,
dengan jumlah total masing-masing AS$1.505 dan with total amount of US$1,505 and US$665
AS$665 (termasuk AS$380 dari koreksi rugi fiskal (including US$380 of the 2015 tax loss
2015 yang dapat dikompensasikan). carryforward correction), respectively.
Namun, kesimpulan laporan audit BPKP However, the conclusion of the BPKP audit report
menyatakan bahwa kurang bayar bagian stated that the underpayment of Government
Pemerintah hanya sebesar AS$215, yang share only amounted to US$215, which represents
merupakan 34% dari biaya yang tidak dapat 34% of the non-deductible expenses of US$665.
dikurangkan sebesar AS$665. BPKP tidak BPKP did not state that the PCO finding resulted in
menyatakan bahwa temuan PCO harus underpayment of the Government share.
berdampak pada bagian Pemerintah.
Pada tanggal 12 Februari 2020, SEGWWL On 12 February 2020, SEGWWL received a
menerima surat pemberitahuan dari DJA terkait notification letter from the DGB in relation to the
laporan audit tersebut dengan total kurang bayar audit report with a total underpayment of the
bagian Pemerintah sebesar AS$217. SEGWWL Government share amounting to US$217.
telah melunasi masing-masing jumlah tersebut SEGWWL has fully paid the respective amount on
pada bulan Maret 2020 dan tidak memiliki rencana March 2020 and has no further plan to submit an
lebih lanjut untuk mengajukan keberatan karena objection as the amount is not material to the
jumlah tersebut tidak material terhadap laporan financial statements.
keuangan.
2017-2018 audit 2017-2018 audit
Pada tanggal 17 Januari 2022, BPKP On 17 January 2022, the BPKP issued its 2017-
mengeluarkan laporan audit 2017-2018 dengan 2018 audit report with findings totalling US$677.
total temuan AS$677. Untuk tahun 2017 dan 2018, For the years 2017 and 2018, BPKP only approved
BPKP hanya menyetujui biaya PCO sebesar PCO charges with a total amount of US$680 out of
AS$680 dari AS$1.045. BPKP beranggapan US$1,045. BPKP argued that the amount of
bahwa jumlah AS$365 itu tidak disetujui oleh PGE. US$365 was not approved by PGE. Other findings
Temuan lain termasuk jumlah beban yang tidak include the amount of expenses that should not be
boleh dikurangkan, sebesar AS$312. deductible, amounting to US$312.
Oleh karena itu, BPKP menyatakan bahwa kurang Therefore, BPKP stated that the underpayment of
bayar bagian Pemerintah karena kelebihan biaya Government share due to excess of PCO charges
PCO dan pengurangan biaya yang dapat and reduction of deductible expenses amounted to
dikurangkan adalah sebesar AS$221 untuk tahun US$221 in total for the years 2017 and 2018.
2017 dan 2018.
Selanjutnya, pada tanggal 19 Januari 2022, Subsequently, on 19 January 2022, SEGWWL
SEGWWL menerima surat pemberitahuan dari received a notification letter from the DGB in
DJA sehubungan dengan laporan audit tersebut relation to the audit report with total underpayment
dengan total kurang bayar bagian Pemerintah of the Government share amounting to US$221
sebesar AS$221 (2017: AS$110 dan 2018: (2017: US$110 and 2018: US$111).
AS$111).
127
Page 130
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
SEGWWL setuju dengan temuan tersebut sebesar SEGWWL agreed with the findings of US$28 and
AS$28 dan mencatatnya sebagai bagian dari recorded it as part of income tax expense in profit
beban pajak penghasilan dalam laba rugi untuk or loss for the year ended 31 December 2022. On
tahun yang berakhir pada tanggal 14 April 2022, SEGWWL submitted an objection
31 Desember 2022. Pada tanggal 14 April 2022, letter to the DGB for the remaining US$193 and
SEGWWL mengajukan surat keberatan kepada recorded the payment as prepaid government
DGB untuk sisa AS$193 dan mencatat audit claims.
pembayaran tersebut sebagai klaim audit
pemerintah dibayar di muka.
Pada tanggal 6 Oktober 2022, SEGWWL On 6 October 2022, SEGWWL received a decision
menerima surat keputusan dari Kemenkeu letter from the MoF No. S-385/MK.2/2022 rejecting
No. S-385/MK.2/2022 yang menolak keberatan the SEGWWL’s objections. As a response to this
SEGWWL. Menanggapi surat keputusan ini, decision letter, management has decided to write-
manajemen telah memutuskan untuk menghapus off the remaining US$193 prepayment. Therefore,
sisa pembayaran di muka sebesar AS$193. Oleh the full amount of the findings of US$221 of the
karena itu, seluruh temuan sebesar AS$221 bagian Government share for 2017-2018 has been
Pemerintah untuk tahun 2017-2018 telah dicatat recorded as income tax expense in profit or loss for
sebagai beban pajak penghasilan dalam laba rugi the year ended 31 December 2022.
untuk tahun yang berakhir pada tanggal
31 Desember 2022.
Kelompok Kontraktor Darajat Darajat Contractor Group
Sampai dengan tanggal penyelesaian laporan As of the completion date of these consolidated
keuangan konsolidasian ini, Kelompok Kontraktor financial statements, the Darajat Contractor Group
Darajat memiliki berbagai temuan audit dari auditor has various audit findings from the Government
Pemerintah untuk periode 2004-2018 sebesar auditors for the period from 2004-2018 amounting
AS$7.179 terkait temuan Pertamina Production to US$7,179 relating to Pertamina Production
Allowance (“PPA”), AS$2.931 terkait dengan PCO Allowance findings (“PPA”), US$2,931 relating to
dan AS$4.078 terkait dengan temuan lainnya. PCO and US$4,078 relating to other findings.
Manajemen berkeyakinan bahwa, sesuai dengan Management believes that, as per Indonesian tax
peraturan perpajakan Indonesia, PPA regulations, the PPA is categorised as a cost
dikategorikan sebagai biaya yang dikeluarkan oleh incurred by the Darajat Contractor Group to obtain,
Kelompok Kontraktor Darajat untuk memperoleh, maintain and manage its revenue. On that basis,
memelihara dan mengelola pendapatannya. Atas management believes that the PPA should be
dasar itu, manajemen berkeyakinan bahwa PPA classified as a deductible cost. Hence, it should be
harus diklasifikasikan sebagai biaya yang dapat treated as a deduction from the Government share
dikurangkan, sehingga harus diperlakukan sebagai calculation. Notwithstanding the findings pertaining
to the PPA, the Government auditors have never
pengurang perhitungan bagian Pemerintah.
factored in the findings relating to PPA as an
Terlepas dari temuan yang berkaitan dengan PPA,
underpayment of the Government share. If the
auditor Pemerintah tidak pernah memperhitungkan
findings relating to PPA materialise, the income tax
temuan terkait PPA sebagai kurang bayar bagian expense will increase by US$7,179.
Pemerintah. Jika temuan terkait PPA terwujud,
beban pajak penghasilan akan meningkat sebesar
AS$7.179.
Atas temuan auditor Pemerintah lainnya, DJA With regards to the other findings of the
menerbitkan Surat Kurang Bayar setoran bagian Government auditors, the DGB issued an
Pemerintah periode 2013-2018 sebesar AS$1.489, underpayment of Government share letter for the
yang telah dibayarkan oleh Kelompok Kontraktor period from 2013-2018 totalling US$1,489, which
Darajat. Jika sisa temuan tersebut terwujud, beban has been paid by the Darajat Contractor Group. If
pajak penghasilan akan meningkat sebesar the remaining findings materialise, the income tax
AS$890. expense will increase by US$890.
Berikut rincian hasil pemeriksaan yang dilakukan The following are the details of the results of the
oleh auditor Pemerintah pada setiap tahun audits conducted by the Government auditors for
anggaran: each fiscal year:
128
Page 131
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Audit 2004-2012 2004-2012 audit
Kelompok Kontraktor Darajat memiliki berbagai The Darajat Contractor Group has various audit
temuan audit dari auditor Pemerintah untuk periode findings from the Government auditors for the
2004-2012 sebesar AS$3.465 terkait temuan PPA, period from 2004-2012 amounting to
AS$804 terkait temuan PCO dan AS$1.410 terkait US$3,465 relating to PPA findings, US$804
temuan lainnya, namun BPKP tidak menyatakan relating PCO findings and US$1,410 related to
temuan ini akan menghasilkan dalam bagian other findings, but BPKP did not declare these
Kurang Bayar Pemerintah. Jika hal ini terwujud, findings will result in the Underpayment of
dampak temuan terkait PPA ini akan meningkatkan Government share. If this materialises, the impact
bagian Pemerintah sebesar AS$3.465 dan dampak of this finding relating to PPA will increase the
temuan lainnya akan meningkatkan bagian Government share by US$3,465 and the impact of
Pemerintah sebesar AS$753. other findings will increase the Government share
by US$753.
Audit 2013-2014 2013-2014 audit
Pada tanggal 26 Mei 2016, BPKP mengeluarkan On 26 May 2016, the BPKP issued its 2013-2014
laporan audit 2013-2014 dengan total temuan audit report with findings totalling US$3,896. Most
AS$3.896. Sebagian besar temuan berkaitan of the findings pertained to the dispute over the
dengan sengketa jumlah PPA, PCO, dan jumlah amount of PPA, the PCO, and the amount of
biaya yang tidak boleh dikurangkan, masing- expenses that should not be deductible, with total
masing sebesar AS$819, AS$1.073 dan AS$2.004. amounts of US$819, US$1,073 and US$2,004,
respectively.
Namun, kesimpulan laporan audit BPKP However, the conclusion of the BPKP audit report
menyatakan bahwa kurang bayar bagian stated that underpayment of the Government
Pemerintah hanya sebesar AS$678, yang share only amounted to US$678, which represents
merupakan 34% dari biaya yang tidak dapat 34% from the non-deductible expenses of
dikurangkan sebesar AS$2.004. BPKP tidak US$2,004. BPKP did not state that PPA and PCO
menyatakan bahwa temuan PPA dan PCO findings resulted in underpayment of the
mengakibatkan kurang bayar bagian Pemerintah. Government share.
Pada tanggal 5 September 2016, Kelompok On 5 September 2016, the Darajat Contractor
Kontraktor Darajat menerima surat pemberitahuan Group received a notification letter from the DGB
dari DJA sehubungan dengan laporan audit in relation to the audit report with a total
tersebut dengan total kurang bayar bagian underpayment of the Government share
Pemerintah sebesar AS$1.043, yang lebih tinggi amounting to US$1,043, which was higher by
sebesar AS$365 dari kurang bayar bagian US$365 than the underpayment of the
Pemerintah yang tercantum dalam laporan audit Government share stated in the BPKP audit report.
BPKP.
Kelompok Kontraktor Darajat membayar jumlah The Darajat Contractor Group paid the amount and
tersebut dan menyerahkan surat tersebut ke DJA submitted the letter to the DGB on 1 December
pada tanggal 1 Desember 2016. Kelompok 2016. The Darajat Contractor Group then sent a
Kontraktor Darajat kemudian mengirimkan surat submission letter for new proof on 25 January 2018
pengajuan bukti baru pada tanggal 25 Januari 2018 in accordance with Government Regulations (“PP”)
sesuai Peraturan Pemerintah (“PP”) No. 34 Tahun No. 34 Year 2010. On 26 January 2018, the DGB
2010. Pada tanggal 26 Januari 2018, DJA issued a decision letter for overpayment of the
menerbitkan surat keputusan lebih bayar bagian Government share for the year 2013-2014. Based
Pemerintah untuk tahun 2013-2014. Berdasarkan on the decision letter, the DGB approved this
surat keputusan tersebut, DJA menyetujui objection amounting to US$15.
keberatan tersebut sebesar AS$15.
Tahap Keberatan Objection stage
Pada tanggal 24 April 2018, Kelompok Kontraktor On 24 April 2018, the Darajat Contractor Group
Darajat mengajukan gugatan kepada Kemenkeu di filed a claim against the MoF at the PTUN to
PTUN untuk membantah Surat Keputusan dispute the decision letter.
tersebut.
Pada tanggal 26 November 2018, PTUN On 26 November 2018, PTUN pronounced the
mengumumkan putusan yang memenangkan verdicts in favour of the Darajat Contractor Group.
The verdicts are as follows:
129
Page 132
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Kelompok Kontraktor Darajat. Putusannya adalah
sebagai berikut:
1) Mengabulkan semua gugatan. 1) Grant all of the lawsuits.
a. Kemenkeu tidak berwenang memungut a. The MoF has no authority to collect the
PNBP; PNBP;
b. Kemenkeu tidak berwenang meminta audit b. The MoF has no authority to request an
kepada BPKP atas kewajiban PNBP audit to BPKP on the Darajat Contractor
Kelompok Kontraktor Darajat; group PNBP obligations;
c. Kemenkeu tidak berwenang memutuskan c. The MoF has no authority to decide the
lebih bayar atau kurang bayar PNBP overpayment or underpayment of the
Kelompok Kontraktor Darajat berdasarkan Darajat Contractor Group PNBP based on
hasil audit BPKP; BPKP audit result;
d. Objek sengketa melanggar undang- d. The objects of the dispute violated the
undang PNBP; dan PNBP law; and
e. Objek sengketa bertentangan dengan e. The objects of the dispute were in contrary
prinsip-prinsip umum pemerintahan yang to the general principles of good
baik. governance.
2) Menyatakan Surat Keputusan batal demi 2) Declare null and void the decision letter.
hukum.
3) Mewajibkan Kemenkeu mencabut Surat 3) Require the MoF to revoke the decision letter.
Keputusan tersebut.
4) Kemenkeu untuk membayar seluruh biaya 4) The MoF to pay all of the court fees of
perkara sebesar Rp282.000 – nilai penuh. IDR282,000 – full amount.
Tahap Banding Appeal stage
Pada tanggal 6 Februari 2019, Kemenkeu On 6 February 2019, the MoF submitted a
menyerahkan memorandum banding ke PTTUN memorandum of appeal to PTTUN in response to
sebagai tanggapan atas keputusan yang the decision issued by PTUN regarding the 2013-
dikeluarkan oleh PTUN tentang laporan audit 2013- 2014 audit reports. On 21 February 2019, the
2014. Pada tanggal 21 Februari 2019, Kelompok Darajat Contractor Group submitted a contra
Kontraktor Darajat menyerahkan kontra memorandum of appeal to PTTUN.
memorandum banding ke PTTUN.
Pada tanggal 11 April 2019, PTTUN mengeluarkan On 11 April 2019, PTTUN issued its appeal
putusan banding yang menerima eksepsi tergugat decision accepting the exception of the defendant
(yaitu: Kemenkeu) atas kompetensi absolut (i.e. MoF) on the absolute competence of the court
pengadilan dan menyatakan bahwa PTUN tidak and declaring that the PTUN has no authority to
berwenang mengadili perkara quo tersebut sesuai adjudicate such a quo case in accordance with Law
dengan UU No. 20 tahun 1997 tentang Penerimaan No. 20 year 1997 involving Non-Tax State
Negara Bukan Pajak. Revenue.
Tahap Kasasi Cassation stage
Pada tanggal 23 Mei 2019, Kelompok Kontraktor On 23 May 2019, the Darajat Contractor Group
Darajat mengajukan memori kasasi ke Mahkamah submitted the memorandum of cassation to the
Agung dengan dasar bahwa sesuai dengan Surat Supreme Court on the basis that, in accordance
Edaran Mahkamah Agung No. 4 tahun 2016 (Surat with the Supreme Court Circular Letter No. 4 year
Edaran Mahkamah Agung 2016 (Surat Edaran Mahkamah Agung No. 4/2016)
No. 4/2016) (“SEMA 4/2016”) setelah terbitnya (“SEMA 4/2016”) after the issuance of Law No. 30
Undang-Undang No. 30 Tahun 2014 tentang Tata year 2014 regarding the State Administration, the
Usaha Negara, kewenangan penyelesaian authority to solve the dispute related to the state
sengketa tata usaha negara berada di bawah administrative matters would be under PTUN, and
PTUN, bukan PTTUN. Oleh karena itu, Kelompok not PTTUN. Therefore, the Darajat Contractor
Kontraktor Darajat berkeberatan atas keputusan Group objected to the PTTUN decision during the
PTTUN tersebut selama tahap kasasi di atas dan appeal stage above and believes that the basis of
berpendapat bahwa dasar peraturan yang the regulations used by PTTUN was not up to date.
digunakan oleh PTTUN tidak diperbarui.
Pada tanggal 3 Oktober 2019, Mahkamah Agung On 3 October 2019, the Supreme Court issued its
mengeluarkan putusan kasasi No. cassation decision No. 455/K/TUN/2019 refusing
455/K/TUN/2019 yang menolak permohonan the cassation request from the Darajat Contractor
kasasi dari Kelompok Kontraktor Darajat. Group.
130
Page 133
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Tahap peninjauan kembali Civil review stage
Pada tanggal 16 Juli 2020, Kelompok Kontraktor On 16 July 2020, Darajat Contractor Group
Darajat mengajukan nota peninjauan kembali ke submitted the memorandum of civil review to the
Mahkamah Agung. Pada tanggal 22 Desember Supreme Court. On 22 December 2020, the
2020, Mahkamah Agung mengeluarkan putusan Supreme Court issued its decision
No. 173/PK/TUN/2020 yang menolak peninjauan No. 173/PK/TUN/2020 declining the memorandum
kembali dari Kelompok Kontraktor Darajat. of civil review from the Darajat Contractor Group.
Proses pengajuan ulang ke tahap PTTUN Resubmission to PTTUN stage
Pada tanggal 23 Agustus 2021, Kelompok On 23 August 2021, Darajat Contractor Group re-
Kontraktor Darajat mengajukan kembali gugatan submitted a lawsuit with the same matter (as in the
dengan hal yang sama (seperti pada proses previous proceeding) to the PTTUN.
sebelumnya) ke PTTUN.
Pada tanggal 17 Februari 2022, PTTUN On 17 February 2022, PTTUN issued its verdict
mengeluarkan putusan yang menolak keberatan rejecting the objection of Darajat Contractor Group
Kelompok Kontraktor Darajat atas kurang bayar regarding the underpayment of the Government
bagian Pemerintah untuk tahun 2013-2014, share for 2013-2014, which amounted to
sebesar AS$1.043. US$1,043.
Pada tanggal 2 Maret 2022, manajemen telah On 2 March 2022, management has submitted a
mengajukan tanggapan resmi kepada PTTUN dan formal response to the PTTUN and on 16 March
pada tanggal 16 Maret 2022, SEGDL telah 2022, SEGDL has submitted its cassation request
mengajukan permohonan kasasi ke Mahkamah to the Supreme Court appealing the PTTUN
Agung untuk mengajukan banding atas putusan verdict.
PTTUN tersebut.
Pada tanggal 21 Juni 2022, Mahkamah On 21 June 2022, the Supreme Court issued its
Agung mengeluarkan putusan kasasi cassation decision No. 305/K/TUN/2022 rejecting
No. 305/K/TUN/2022 yang menolak permohonan the cassation request from the Darajat Contractor
kasasi dari Kelompok Kontraktor Darajat yang Group for which the copy of the decision was
salinan putusannya telah diterima pada tanggal received on 8 September 2022.
8 September 2022.
Menyusul putusan kasasi Mahkamah Agung, Grup Following the Supreme Court cassation decision,
Kontraktor Darajat telah mencatat penyisihan the Darajat Contractor Group has recorded a full
penuh atas penurunan nilai sebesar AS$1.043 per provision for impairment of US$1,043 as of
31 Desember 2022, yang merupakan tambahan 31 December 2022, which represents an additional
penyisihan sebesar AS$365 di tahun 2022 dari provision of US$365 in 2022 from the provision of
penyisihan sebesar AS$678 di tahun 2021, dicatat US$678 in 2021, recorded as part of income tax
sebagai bagian beban pajak penghasilan dalam expense in profit or loss.
laporan laba rugi.
Audit 2015 2015 audit
Pada tanggal 15 September 2017, BPKP On 15 September 2017, BPKP issued its 2015
mengeluarkan laporan audit 2015 dengan total audit report with findings totalling US$885. Most of
temuan AS$885. Sebagian besar temuan berkaitan the findings pertain to the dispute over the amount
dengan sengketa jumlah PPA dan kelengkapan of PPA and the completeness of documentation
dokumentasi masing-masing sebesar AS$626 dan amounting to US$626 and US$259, respectively.
AS$259.
Namun, kesimpulan laporan audit BPKP However, the conclusion of the BPKP audit report
menyebutkan bahwa kurang bayar bagian stated that the underpayment of the Government
Pemerintah hanya sebesar AS$88, yang share only amounted to US$88, which represents
merupakan 34% dari ketidaklengkapan 34% of the incomplete documentation cost of
dokumentasi sebesar AS$259. BPKP tidak US$259. BPKP did not state that the PPA finding
menyatakan bahwa temuan PPA mengakibatkan resulted in underpayment of the Government
kurang bayar bagian Pemerintah. share.
131
Page 134
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Pada tanggal 13 Maret 2018, Kelompok Kontraktor On 13 March 2018, the Darajat Contractor Group
Darajat menerima dari DJA surat ketetapan kurang received from the DGB the assessment letter of
bayar bagian pemerintah sebesar AS$88. Pada underpayment for the Government share
tanggal 12 April 2018, Kelompok Kontraktor amounting to US$88. On 12 April 2018, the Darajat
Darajat membayar jumlah tersebut dan Contractor group paid this amount and submitted
mengajukan surat keberatan kepada DJA pada an objection letter to the DGB on 7 June 2018.
tanggal 7 Juni 2018.
Pada tanggal 23 Juli 2019, DJA telah menerbitkan On 23 July 2019, the DGB issued a decision letter
surat keputusan lebih bayar bagian pemerintah for overpayment of the Government share for the
untuk tahun 2015. Berdasarkan surat keputusan year 2015. Based on the decision letter, DGB has
tersebut, DJA belum menyetujui permohonan not approved the objection request from the
keberatan dari Kelompok Kontraktor Darajat. Oleh Darajat Contractor Group. Therefore, as a
karena itu, sebagai tanggapan atas surat response to this decision letter, management has
keputusan ini, manajemen telah memutuskan decided to write-off the prepaid amount and record
untuk menghapuskan jumlah dibayar di muka dan loss in profit or loss in 2019.
mencatat kerugian pada laporan laba rugi
konsolidasi tahun 2019.
Audit 2016 2016 audit
Pada tanggal 23 Juli 2020, Kelompok Kontraktor On 23 July 2020, the Darajat Contractor Group
Darajat menerima laporan audit tahun 2016 yang received the 2016 audit report issued by BPKP with
dikeluarkan oleh BPKP dengan total temuan findings totalling US$1,354. Most of the findings
sebesar AS$1.354. Sebagian besar temuan pertain to the dispute over the amount of PPA,
berkaitan dengan sengketa tentang jumlah PPA, PCO and other amounts of expenses that should
PCO dan jumlah biaya lain yang tidak boleh not be deductible amounting to US$697, US$404
dikurangkan masing-masing sebesar AS$697, and US$253, respectively.
AS$404 dan AS$253.
Namun, kesimpulan laporan audit BPKP However, the conclusion of the BPKP audit report
menyebutkan bahwa kurang bayar bagian stated that the underpayment of the Government
Pemerintah hanya sebesar AS$86, yang share only amounted to US$86, which represents
merupakan 34% dari jumlah pengeluaran yang 34% of the amount of expenses that should not be
tidak boleh dikurangkan sebesar AS$253. BPKP deductible of US$253. BPKP did not state that PPA
tidak menyatakan bahwa temuan PPA dan PCO and PCO findings resulted in underpayment of the
mengakibatkan kurang bayar bagian Pemerintah. Government share.
Selanjutnya, pada tanggal 14 Agustus 2020, Subsequently, on 14 August 2020, the Darajat
Kelompok Kontraktor Darajat menerima surat Contractor Group received a notification letter from
pemberitahuan dari DJA sehubungan dengan the DGB in relation to the audit report, with a total
laporan audit tersebut, yang menunjukkan total underpayment of the Government share
kurang bayar bagian Pemerintah sebesar AS$86, amounting to US$86, which was paid by the
yang telah dibayarkan oleh Kelompok Kontraktor Darajat Contractor Group on 2 September 2020.
Darajat pada tanggal 2 September 2020. Temuan Such findings are expensed in profit or loss in
tersebut dibebankan pada laba rugi tahun 2020. 2020.
Audit 2017-2018 2017-2018 audit
Pada tanggal 17 Januari 2022, BPKP On 17 January 2022, the BPKP issued its 2017-
mengeluarkan laporan audit 2017-2018 dengan 2018 audit report with total findings of US$2,373.
total temuan AS$2.373. Untuk tahun 2017 dan For the years 2017 and 2018, BPKP only approved
2018, BPKP hanya menyetujui biaya PCO dengan PCO charges with a total amount of US$1,065 out
jumlah total AS$1.065 dari AS$1.714. BPKP of US$1,714. BPKP argued that the amount of
beranggapan bahwa jumlah AS$649 itu tidak US$649 was not approved by PGE. Other findings
disetujui oleh PGE. Temuan lainnya termasuk PPA include PPA and the amount of expenses that
dan jumlah beban yang tidak boleh dikurangkan should not be deductible amounting to US$1,572
masing-masing sebesar AS$1.572 dan AS$152. and US$152, respectively.
132
Page 135
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Namun, kesimpulan laporan audit BPKP However, the conclusion of the BPKP audit report
menyatakan bahwa kurang bayar bagian stated that underpayment of the Government
Pemerintah hanya sebesar AS$272, yang share only amounted to US$272, which represents
merupakan 34% dari beban yang tidak dapat 34% of the non-deductible expenses of US$801.
dikurangkan sebesar AS$801.
Selanjutnya, pada tanggal 24 Januari 2022, Subsequently, on 24 January 2022, Darajat
Kelompok Kontraktor Darajat menerima surat Contractor Group received a notification letter from
pemberitahuan dari DJA sehubungan dengan the DGB in relation to the audit report with a total
laporan audit tersebut dengan total kurang bayar underpayment of the Government share
bagian Pemerintah sebesar AS$272. amounting to US$272.
Kelompok Kontraktor Darajat setuju dengan Darajat Contractor Group agreed with the findings
temuan sebesar AS$212 dan mencatatnya sebagai of US$212 and recorded it as part of income tax
bagian dari beban pajak penghasilan dalam expense in profit or loss for the year ended
laporan laba rugi untuk tahun yang berakhir pada 31 December 2022. On 14 April 2022, the Darajat
tanggal 31 Desember 2022. Pada tanggal 14 April Contractor Group submitted an objection letter to
2022, Kelompok Kontraktor Darajat mengajukan the DGB for the remaining US$60 and recorded the
surat keberatan kepada DJA atas tersisa sebesar payment as prepaid government audit claims.
AS$60 dan mencatat pembayaran tersebut
sebagai pembayaran di muka sehubungan dengan
klaim audit pemerintah.
Pada tanggal 6 Oktober 2022, Kelompok On 6 October 2022, the Darajat Contractor Group
Kontraktor Darajat menerima surat keputusan dari received a decision letter from the MoF
Kemenkeu No. S-383/MK.2/2022 yang menolak No. S-383/MK.2/2022 rejecting the Darajat
keberatan Kelompok Kontraktor Darajat. Contractor Group’s objections. As a response to
Menanggapi surat keputusan ini, manajemen telah this decision letter, management has decided to
memutuskan untuk menghapus sisa pembayaran write-off the remaining US$60 prepayment.
di muka sebesar AS$60. Oleh karena itu, seluruh Therefore, the full amount of the findings of
temuan sebesar AS$272 bagian Pemerintah untuk US$272 of the Government share for 2017-2018
tahun 2017-2018 telah dicatat sebagai bagian dari has been recorded as part of income tax expense
beban pajak penghasilan dalam laba rugi untuk in profit or loss for the year ended 31 December
tahun yang berakhir pada tanggal 31 Desember 2022.
2022.
Audit 2006 dan 2010 2006 and 2010 audit
Pada tahun 2013 dan 2014, DJP menerbitkan surat In 2013 and 2014, the DGT issued tax
ketetapan pajak terkait klaim audit PPA untuk assessments regarding PPA audit claims for fiscal
tahun fiskal 2006 dan 2010. Kelompok Kontraktor years 2006 and 2010. The Darajat Contractor
Darajat mengajukan keberatan atas SKP ini, yang Group filed an objection to these tax assessments,
ditolak oleh DJP. Dalam hal ini, Kelompok which was rejected by the DGT. In this regard, the
Kontraktor Darajat mengajukan banding ke Darajat Contractor Group filed appeals to the tax
pengadilan pajak pada tanggal court on 22 June 2015, the result of which was in
22 Juni 2015 yang hasilnya menguntungkan favour of the Darajat Contractor Group for fiscal
Kelompok Kontraktor Darajat untuk tahun fiskal year 2006 amounting to US$115. The DGT filed a
2006 sejumlah AS$115. DJP mengajukan reconsideration against the result to the Supreme
pertimbangan ulang terhadap hasilnya ke Court on 23 May 2017. On 2 December 2021, the
Mahkamah Agung pada tanggal 23 Mei 2017. Pada Supreme Court issued a decision in favour of
tanggal 2 Desember 2021, Mahkamah Agung Darajat Contractor Group rejecting the appeal from
menerbitkan keputusan yang menguntungkan bagi the DGT.
Kelompok Kontraktor Darajat dan menolak banding
oleh DJP.
Kelompok Kontraktor Darajat menerima putusan The Darajat Contractor Group received a tax court
pengadilan pajak tertanggal 19 Februari 2018 verdict dated 19 February 2018 in relation to the
sehubungan dengan temuan audit PPA untuk PPA audit finding for the fiscal year 2010
tahun fiskal 2010 sebesar AS$186, yang amounting to US$186, which approved the DGT’s
menyetujui keputusan DJP. Pada tanggal 18 Mei decision. On 18 May 2018, the Darajat Contractor
2018, Kelompok Kontraktor Darajat mengajukan Group re-submitted an appeal to the Supreme
kembali banding ke Mahkamah Agung terkait Court related to this matter.
dengan masalah ini.
133
Page 136
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Pada tanggal 14 Januari 2019, Kelompok On 14 January 2019, the Darajat Contractor Group
Kontraktor Darajat menerima keputusan pengajuan received the Supreme Court reconsideration
kembali dari Mahkamah Agung terkait dengan verdict related with the PPA’s audit finding for fiscal
temuan audit PPA tahun fiskal 2010 yang menolak year 2010, which rejected the reconsideration
permintaan pengajuan kembali dari Kelompok request from the Darajat Contractor Group. In
Kontraktor Darajat. Pada tahun 2023, manajemen 2023, management has recorded a full provision
telah mencatat cadangan penuh untuk penurunan for impairment of US$186 as of 31 December
nilai sebesar AS$186 pada tanggal 31 Desember 2023, recorded as part on income tax expense in
2023, dicatat sebagai bagian dari beban pajak profit or loss.
penghasilan dalam laba rugi.
Untuk ketetapan pajak lain yang diterbitkan untuk For another tax assessment issued for fiscal year
tahun pajak 2010 sebesar AS$193, putusan 2010 amounting to US$193, the tax court verdict
pengadilan pajak mengeluarkan keputusan yang issued a favourable decision for the Darajat
menguntungkan bagi Kelompok Kontraktor Darajat Contractor Group on 5 September 2019. The DGT
pada tanggal 5 September 2019. DJP mengajukan filed a reconsideration against the result to the
peninjauan kembali terhadap hasil tersebut ke Supreme Court on 12 December 2019. As a result,
Mahkamah Agung pada tanggal the Supreme Court issued a favourable decision
12 Desember 2019. Akibatnya, Mahkamah Agung for Darajat Contractor Group on 9 September
mengeluarkan putusan yang menguntungkan bagi 2020. The amount of tax refund was received by
Grup Kontraktor Darajat pada tanggal 9 September SEGD-I on 16 December 2020.
2020. Besaran restitusi pajak tersebut telah
diterima oleh SEGD-I pada tanggal 16 Desember
2020.
PPN ditangguhkan Deferred VAT
Sebagaimana dinyatakan dalam Surat Ketetapan As stated in an Assessment Letter issued by the
yang diterbitkan oleh kantor pajak BADORA BADORA tax office to SEGD-II as the operator of
kepada SEGD-II sebagai operator JOC Darajat the Darajat JOC dated 24 January 2000, Darajat
tertanggal 24 Januari 2000, Kelompok Kontraktor Contractor Group was required to pay all
Darajat diharuskan membayar seluruh PPN outstanding deferred VAT amounting to IDR90
tangguhan terutang sebesar Rp90 miliar (setara billion (equivalent to US$5.5 million – full amount).
dengan AS$5,5 juta – nilai penuh).
Kelompok Kontraktor Darajat keberatan dengan The Darajat Contractor Group objected to the letter
surat tersebut dan berdasarkan surat keputusan and based on decision letter dated 7 February
tertanggal 7 Februari 2001, jumlah yang harus 2001, the amount required to be paid was reduced
dibayar dikurangi menjadi Rp71 miliar (setara to IDR71 billion (equivalent to US$4.4 million – full
dengan AS$4,4 juta – nilai penuh) dan denda amount) and penalties amounting to IDR1.4
sebesar Rp1,4 miliar (setara dengan AS$86 ribu – billion (equivalent to US$86 thousand – full
nilai penuh). amount).
Sebagaimana disyaratkan oleh undang-undang As required by the tax laws, the Darajat Contractor
perpajakan, Kelompok Kontraktor Darajat Group paid the deferred VAT and its penalties
membayar PPN tangguhan dan dendanya sebesar amounting to IDR72.4 billion (equivalent to US$4.5
Rp72,4 miliar (setara dengan AS$4,5 juta – nilai million – full amount), and then appealed to the tax
penuh), dan kemudian mengajukan banding ke court.
pengadilan pajak.
Pada tanggal 3 Januari 2002, Kelompok Kontraktor On 3 January 2002, the Darajat Contractor Group
Darajat menerima surat penagihan pajak atas PPN received a tax collection letter assessing late
tangguhan yang belum dibayar sejumlah Rp21,7 payment penalties on unpaid deferred VAT
miliar (setara dengan AS$1,3 juta – nilai penuh) amounting to IDR21.7 billion (equivalent to US$1.3
untuk periode 15 bulan Maret 2000 – Mei 2001, million – full amount) for the 15 month period March
yang merupakan periode dari jatuh tempo sampai 2000 – May 2001, representing the period from the
dengan tanggal pembayaran PPN yang due date to the payment date of deferred VAT by
ditangguhkan oleh Kelompok Kontraktor Darajat. the Darajat Contractor Group.
134
Page 137
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Pada tanggal 3 Mei 2002, pengadilan pajak On 3 May 2002, the tax court issued its judgement
mengeluarkan putusan yang menguatkan confirming the tax office’s assessment requiring
ketetapan kantor pajak yang mewajibkan the payment of the deferred VAT. Subsequently,
pembayaran PPN yang ditangguhkan. Oleh karena the Darajat Contractor Group submitted a
itu, Kelompok Kontraktor Darajat mengajukan reconsideration of the decision to the Supreme
peninjauan kembali atas putusan tersebut ke Court.
Mahkamah Agung.
Pada bulan September 2002, Kelompok Kontraktor In September 2002, the Darajat Contractor Group
Darajat membayar Rp2 miliar (setara dengan paid IDR2 billion (equivalent to US$123 thousand
AS$123 ribu – nilai penuh) dari denda – full amount) from IDR21.7 billion of the late
keterlambatan pembayaran sebesar Rp21,7 miliar payment penalties (equivalent to US$1.3 million –
(setara dengan AS$1,3 juta – nilai penuh). Jumlah full amount). This amount was expensed in profit or
yang dibayarkan dibebankan pada laba rugi 31 loss for the year ended 31 December 2002.
Desember 2002.
Pada bulan September 2003, Mahkamah Agung In September 2003, the Supreme Court issued its
mengeluarkan keputusan yang memenangkan decision in favour of the Darajat Contractor Group.
Kelompok Kontraktor Darajat. Selanjutnya pada Subsequently, on 27 May 2004, the DGT issued
tanggal 27 Mei 2004 DJP mengeluarkan surat decision letters regarding the Supreme Court’s
keputusan atas putusan Mahkamah Agung yang decision which cancelled the requirement to pay
membatalkan kewajiban membayar PPN the deferred VAT for the Darajat Contractor Group
tangguhan untuk Kelompok Kontraktor Darajat amounting to IDR71 billion (equivalent to US$4.4
sebesar Rp71 miliar (setara dengan AS$4,4 juta – million – full amount), and respective assessed
nilai penuh), dan denda yang dinilai masing-masing penalties amounting to IDR21.7 billion (equivalent
sebesar Rp21,7 miliar (setara dengan AS$1,3 to US$1.3 million – full amount). However, in June
juta – nilai penuh). Namun, pada bulan Juni 2004, 2004, the DGT issued further decisions to cancel
DJP mengeluarkan keputusan lanjutan untuk the previous tax decision letters regarding the
membatalkan surat keputusan perpajakan execution of the Supreme Court’s decision.
sebelumnya mengenai eksekusi putusan
Mahkamah Agung.
Pada November 2010, Kelompok Kontraktor In November 2010, the Darajat Contractor Group,
Darajat melalui suratnya ke kantor pajak telah through its letter to the tax office, requested an
meminta proses pemindahbukuan sebesar Rp71 overbooking process amounting to IDR71 billion
miliar (setara dengan AS$4,4 juta – nilai penuh) (equivalent to US$4.4 million – full amount),
dan termasuk denda sebesar Rp1,4 miliar (setara including penalties amounting to IDR1.4 billion
dengan AS$86 ribu – nilai penuh). (equivalent to US$86 thousand – full amount).
Pada Juni 2013, Kelompok Kontraktor Darajat In June 2013, the Darajat Contractor Group
menerima surat penyitaan untuk rekening banknya received a confiscation letter for its bank account
dari kantor pajak untuk menerima pembayaran from the tax office to collect the above 2002 tax
atas surat penagihan pajak 2002 tersebut. Kantor collection letter. The tax office was still of the
pajak masih berpendapat bahwa Kelompok opinion that the Darajat Contractor Group needed
Kontraktor Darajat perlu membayar denda to pay the outstanding late payment penalties on
keterlambatan atas PPN ditangguhkan yang belum unpaid deferred VAT of IDR21.7 billion (equivalent
dibayar sebesar Rp21,7 miliar (setara dengan to US$1.3 million – full amount). The Darajat
AS$1,3 juta – nilai penuh). Kelompok Kontraktor Contractor Group has filed a lawsuit to the tax court
Darajat mengajukan gugatan ke pengadilan pajak on this confiscation letter. On 19 August 2014,
atas surat penyitaan tersebut. Pada tanggal 19 through the tax court decision letter, the Darajat
Agustus 2014 melalui surat keputusan dari Contractor Group was successful in the lawsuit.
pengadilan pajak, Kelompok Kontraktor Darajat
memenangkan gugatan tersebut.
Sebagaimana dijelaskan di atas, PPN As noted above, the IDR72.4 billion (equivalent to
ditangguhkan sebesar Rp72,4 miliar (setara US$4.5 million – full amount) of paid deferred VAT
dengan AS$4,5 juta – nilai penuh) telah dibayar has been recorded as other receivables to third
dan dicatat sebagai piutang lain-lain kepada pihak parties – non-current in these consolidated
ketiga – tidak lancar di laporan keuangan financial statements.
konsolidasian.
135
Page 138
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Hingga tanggal laporan keuangan konsolidasian Up to the date of these consolidated financial
ini, manajemen terus bekerja sama dengan statements, management continues to work with its
konsultan pajaknya untuk menyiapkan serangkaian tax consultant to prepare a set of action plans to
rencana aksi yang melibatkan pemerintah untuk engage the government to recover the deferred
memulihkan saldo PPN yang ditangguhkan. VAT balance. SEGD-II is still considering actions
SEGD-II masih mempertimbangkan tindakan yang to be taken relating to the claim. The Darajat
akan diambil sehubungan dengan klaim tersebut. Contractor Group believes this amount will be
Kelompok Kontraktor Darajat berkeyakinan bahwa refunded by the tax office or reimbursed by the GOI
jumlah tersebut akan dikembalikan oleh kantor in accordance with the Supreme Court’s decision,
pajak atau diganti dari Pemerintah Indonesia which favours the Darajat Contractor Group, since
sesuai dengan keputusan Mahkamah Agung, yang the Darajat Contractor Group has commenced
menguntungkan Kelompok Kontraktor Darajat, paying the government share in accordance with
karena Kelompok Kontraktor Darajat telah mulai the terms of the JOC and the applicable
membayar bagian Pemerintah sesuai dengan government regulation. As such, no provision for
ketentuan JOC dan peraturan pemerintah yang non-recovery of deferred VAT receivable has been
berlaku. Dengan demikian, tidak ada penyisihan recognised in these consolidated financial
untuk tidak terpulihkannya piutang PPN tangguhan statements.
yang diakui dalam laporan keuangan konsolidasian
ini.
SEGSL SEGSL
Sampai dengan tanggal penyelesaian laporan As of the completion date of these consolidated
keuangan konsolidasian ini, SEGSL memiliki financial statements, SEGSL has various audit
berbagai temuan audit dari auditor Pemerintah findings from the Government auditors for the
untuk periode 2008-2018 sebesar AS$20.357 period from 2008-2018 amounting to US$20,357
terkait temuan PPA, AS$26.548 terkait temuan related to PPA findings, US$26,548 related to PCO
PCO, dan AS$11.758 terkait temuan lainnya. findings, and US$11,758 related to other findings.
Manajemen berkeyakinan bahwa, sesuai dengan Management believes that, as per Indonesian tax
peraturan perpajakan Indonesia, PPA regulations, the PPA is categorised as a cost
dikategorikan sebagai biaya yang dikeluarkan oleh incurred by SEGSL to obtain, maintain and
SEGSL untuk memperoleh, memelihara dan manage its revenue. On that basis, management
mengelola pendapatannya. Atas dasar itu, believes that the PPA should be classified as a
manajemen berkeyakinan bahwa PPA harus deductible cost. Hence, it should be treated as a
diklasifikasikan sebagai biaya yang dapat deduction from the Government share calculation.
dikurangkan sehingga diperlakukan sebagai Notwithstanding the findings pertaining to the PPA,
pengurang perhitungan bagian pemerintah. the Government auditors have never factored in
Terlepas dari temuan terkait PPA, auditor the findings relating to PPA as an underpayment of
Pemerintah tidak pernah menganggap temuan the Government share. If the findings relating to
terkait PPA sebagai kurang bayar bagian PPA materialise, the income tax expense will
Pemerintah. Jika temuan ini terlaksana, beban increase by US$20,357.
pajak penghasilan akan meningkat sebesar
AS$20.357.
Sehubungan dengan temuan auditor Pemerintah With regards to the other findings of the
lainnya, DJA menerbitkan surat bagian pemerintah Government auditors, the DGB issued an
yang kurang bayar periode 2013-2018 sejumlah underpayment of the Government share letter for
AS$11.116 yang telah dibayarkan oleh SEGSL. the period from 2013–2018 totalling US$11,116,
Jika sisa temuan ini diperhitungkan, beban pajak which has been paid by the SEGSL. If the
penghasilan akan meningkat sebesar AS$1.908. remaining findings materialise, the income tax
expense will increase by US$1,908.
Berikut adalah rincian hasil audit yang dilakukan The following are the details of the results of the
oleh auditor Pemerintah untuk setiap tahun audits conducted by the Government auditors for
anggaran: each fiscal year:
136
Page 139
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Audit 2008-2012 2008-2012 audit
SEGSL memiliki berbagai temuan audit dari auditor SEGSL has various audit findings from the
Pemerintah untuk periode 2008-2012 sejumlah Government auditors for the period of 2008-2012
AS$10.963 terkait PPA, AS$2.930 terkait dengan amounting to US$10,963 relating to PPA,
temuan PCO dan AS$959 terkait temuan lainnya, US$2,930 related to PCO findings and US$959
namun BPKP belum menerbitkan surat bagian related to other findings, but BPKP did not declare
Pemerintah yang kurang bayar terkait audit ini. Jika these findings will result in an underpayment of the
temuan terkait PPA akan diperhitungkan, maka Government share. If they materialise, the impact
beban pajak penghasilan akan meningkat sebesar of the findings relating to PPA will increase the
AS$10.963, dan jika temuan lain diperhitungkan, Government share by US$10,963, and the impact
beban pajak penghasilan akan meningkat sebesar of other findings will increase the Government
AS$1.322. share by US$1,322.
Audit 2013-2014 2013-2014 audit
Pada tanggal 6 Juni 2016, BPKP mengeluarkan On 6 June 2016, the BPKP issued its 2013-2014
laporan audit 2013-2014 dengan total temuan audit report with findings totalling US$31,892. Most
sebesar AS$31.892. Sebagian besar temuan of the findings pertain to the dispute over the
berkaitan dengan sengketa tentang jumlah PPA, amount of PPA, the PCO, intercompany allocation
PCO, biaya alokasi antar perusahaan dan jumlah charges and the amounts of expenses that should
biaya yang tidak boleh dikurangkan yang diakui not be deductible recognised with total amounts of
dengan jumlah masing-masing sebesar US$2,756, US$4,814, US$16,303 and US$8,019,
AS$2.756, AS$4.814, AS$16.303 dan AS$8.019. respectively.
Namun, kesimpulan laporan audit BPKP However, the conclusion of the BPKP audit report
menyatakan bahwa kurang bayar bagian stated that underpayment of the Government
Pemerintah hanya sebesar AS$2.726, yang share only amounted to US$2,726, which
merupakan 34% dari biaya yang tidak dapat represents 34% of the non-deductible expenses of
dikurangkan sebesar AS$8.019. BPKP tidak US$8,019. BPKP did not state that PPA, PCO
menyatakan bahwa temuan PPA, temuan PCO finding and intercompany allocation charges
dan biaya alokasi antar perusahaan findings resulted in underpayment of the
mengakibatkan kurang bayar bagian Pemerintah. Government share.
Pada tanggal 5 September 2016, SEGSL On 5 September 2016, SEGSL received a
menerima surat pemberitahuan dari DJA notification letter from the DGB in relation to the
sehubungan dengan laporan audit tersebut dengan audit report with a total underpayment of the
jumlah kurang bayar bagian Pemerintah sebesar Government share amounting to US$9,906, which
AS$9.906, lebih tinggi sebesar AS$7.180 dari is higher by US$7,180, than the underpayment of
kurang bayar bagian Pemerintah yang tercantum the Government share stated in the BPKP audit
dalam laporan audit BPKP. report.
SEGSL membayar jumlah tersebut dan SEGSL paid the amount and submitted an
mengajukan surat keberatan kepada DJA pada objection letter to DGB on 1 December 2016.
tanggal 1 Desember 2016. SEGSL mengirimkan SEGSL sent a submission letter for new proof on
surat pengajuan bukti baru pada tanggal 26 January 2018. The DGB issued a decision letter
26 Januari 2018. DJA telah menerbitkan surat for overpayment of Government share for the year
keputusan lebih bayar bagian Pemerintah untuk 2013-2014. Based on the decision letter, the DGB
tahun 2013-2014. Berdasarkan surat keputusan approved the objection amounting to US$7.
tersebut, DJA menyetujui keberatan tersebut
sebesar AS$7.
Tahap Keberatan Objection Stage
Pada tanggal 24 April 2018, SEGSL mengajukan On 24 April 2018, SEGSL filed a claim against the
gugatan kepada Kemenkeu di PTUN untuk MoF at PTUN to dispute the decision letter. On
membantah Surat Keputusan tersebut. Pada 26 November 2018, PTUN pronounced the
tanggal 26 November 2018, PTUN mengumumkan verdicts in favour of SEGSL. The verdicts are as
putusan yang memenangkan SEGSL. Putusannya follows:
adalah sebagai berikut:
1) Mengabulkan semua gugatan: 1) Grant all of the lawsuits:
a. Kemenkeu tidak berwenang memungut a. The MoF has no authority to collect the
PNBP; PNBP;
137
Page 140
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
b. Kemenkeu tidak berwenang meminta audit b. The MoF has no authority to request an
kepada BPKP atas kewajiban PNBP audit to BPKP on the SEGSL PNBP
SEGSL; obligations;
c. Kemenkeu tidak berwenang memutuskan c. The MoF has no authority to decide the
lebih bayar atau kurang bayar PNBP overpayment or underpayment of the
SEGSL berdasarkan hasil audit BPKP; SEGSL PNBP based on BPKP audit result;
d. Objek sengketa melanggar undang- d. The objects of the dispute violated the
undang PNBP; dan PNBP law; and
e. Objek sengketa bertentangan dengan e. The objects of the dispute were in contrary
prinsip-prinsip umum pemerintahan yang to the general principles of good
baik. governance.
2) Menyatakan Surat Keputusan batal demi 2) Declare null and void the decision letter.
hukum.
3) Mewajibkan Kemenkeu mencabut Surat 3) Require the MoF to revoke the decision letter.
Keputusan tersebut.
4) Kemenkeu untuk membayar seluruh biaya 4) The MoF to pay all of the court fees of
perkara sebesar Rp282.000 – nilai penuh. IDR282,000 – full amount.
Tahap Banding Appeal stage
Pada tanggal 6 Februari 2019, Kemenkeu On 6 February 2019, the MoF submitted a
mengajukan nota banding kepada PTTUN sebagai memorandum of appeal to PTTUN in response to
tanggapan atas keputusan yang dikeluarkan oleh the decision issued by PTUN regarding 2013-2014
PTUN terkait laporan audit 2013-2014. Pada audit reports. On 21 February 2019, SEGSL has
tanggal 21 Februari 2019, SEGSL telah submitted a contra memorandum of appeal to
mengajukan kontra memori banding kepada PTTUN. On 11 April 2019, PTTUN issued its
PTTUN. Pada tanggal 11 April 2019, PTTUN appeal decision accepting the exception of the
mengeluarkan putusan banding yang menerima defendant (i.e. MoF) on the absolute competence
eksepsi terdakwa (yaitu; Kemenkeu) atas of the court and declaring that the PTUN has no
kompetensi absolut pengadilan dan menyatakan authority to adjudicate such a case in accordance
bahwa PTUN tidak berwenang mengadili kasus with Law No. 20 year 1997 involving Non-Tax State
tersebut sesuai dengan UU no. 20 tahun 1997 Revenue.
tentang Penerimaan Negara Bukan Pajak.
Tahap Kasasi Cassation stage
Pada tanggal 23 Mei 2019, SEGSL mengajukan On 23 May 2019, SEGSL submitted the
memori kasasi ke Mahkamah Agung dengan dasar memorandum of cassation to the Supreme Court
bahwa sesuai dengan Surat Edaran Mahkamah on the basis that, in accordance with the Supreme
Agung No. 4 tahun 2016 (Surat Edaran Mahkamah Court Circular Letter No. 4 year 2016 (Surat
Agung No. 4/2016 (“SEMA 4/2016”), setelah Edaran Mahkamah Agung No. 4/2016) (“SEMA
terbitnya Undang-Undang 4/2016”), after the issuance of Law No. 30 year
No. 30 Tahun 2014 tentang Tata Usaha Negara 2014 regarding the State Administration, the
maka kewenangan penyelesaian sengketa tata authority to solve the dispute related to the state
usaha negara berada di bawah PTUN, bukan administrative matters would be under PTUN, and
PTTUN. Oleh karena itu, SEGSL keberatan not PTTUN. Therefore, SEGSL objected to the
dengan keputusan PTTUN pada tahap banding di PTTUN decision during the appeal stage above
atas dan berpendapat bahwa dasar peraturan yang and believes that the basis of the regulations used
digunakan oleh PTTUN tidak diperbarui. by PTTUN was not up to date.
Pada tanggal 3 Oktober 2019, Mahkamah Agung On 3 October 2019, the Supreme Court issued its
mengeluarkan putusan kasasi No. cassation decision No. 456/K/TUN/2019 declining
456/K/TUN/2019 yang menolak permohonan the cassation request from SEGSL.
kasasi dari SEGSL.
Tahap peninjauan kembali Civil review stage
Pada tanggal 11 Mei 2020, SEGSL mengajukan On 11 May 2020, SEGSL submitted the
peninjauan kembali ke Mahkamah Agung. Pada memorandum of civil review to the Supreme Court.
tanggal 21 April 2021, Mahkamah Agung On 21 April 2021, the Supreme Court issued its
mengeluarkan putusan No. 2 PK/TUN/2020 yang decision No. 2 PK/TUN/2020 declining the
menolak peninjauan kembali dari SEGSL. memorandum of the civil review from SEGSL.
138
Page 141
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Proses pengajuan ulang ke tahap PTTUN Resubmission to PTTUN stage
Pada tanggal 12 Oktober 2021, SEGSL On 12 October 2021, SEGSL resubmitted a lawsuit
mengajukan kembali gugatan dengan hal yang with the same matter (as in the previous
sama (seperti pada proses sebelumnya) kepada proceeding) to the PTTUN.
PTTUN.
Pada tanggal 16 Maret 2022, PTTUN On 16 March 2022, PTTUN issued its verdict
mengeluarkan putusannya yang menolak rejecting the objection of SEGSL.
keberatan SEGSL.
Pada tanggal 1 April 2022, SEGSL telah On 1 April 2022, SEGSL has submitted its
mengajukan kasasi ke Mahkamah Agung atas cassation request to the Supreme Court appealing
putusan PTTUN tersebut. the PTTUN verdict.
Pada tanggal 12 Juli 2022, Mahkamah Agung On 12 July 2022, the Supreme Court issued its
mengeluarkan putusan kasasi No.339/K/TUN/2022 cassation decision No.339/K/TUN/2022 rejecting
yang menolak permohonan kasasi dari SEGSL the cassation request from the SEGSL, for which a
yang salinannya telah diterima pada tanggal copy was received on 26 September 2022.
26 September 2022.
Menyusul putusan kasasi Mahkamah Agung, Following the Supreme Court cassation decision,
SEGSL telah membukukan penyisihan penurunan SEGSL has recorded a full provision for
nilai penuh sebesar AS$9.906 pada tanggal 31 impairment of US$9,906 as of 31 December 2022,
Desember 2022, yang merupakan tambahan which represents an additional provision of
penyisihan sebesar AS$7.180 di tahun 2022 dari US$7,180 in 2022 from the provision of US$2,726
penyisihan sebesar AS$2.726 di tahun 2021, yang in 2021, recorded as part of income tax expense in
dicatat sebagai bagian dari pajak penghasilan profit or loss.
biaya dalam laba rugi.
Audit 2015 2015 audit
Pada tanggal 15 September 2017, BPKP On 15 September 2017, BPKP issued its 2015
mengeluarkan laporan audit 2015 dengan total audit report with findings totalling US$3,955. Most
temuan AS$3.955. Sebagian besar temuan of the findings pertain to the dispute over the
berkaitan dengan sengketa tentang jumlah PPA, amount of PPA, PCO and amount of expenses that
PCO dan jumlah pengeluaran yang tidak boleh should not be deductible amounting to US$1,512,
dikurangkan masing-masing sebesar AS$1.512, US$1,008 and US$1,435, respectively.
AS$1.008 dan AS$1.435.
Namun, kesimpulan laporan audit BPKP However, the conclusion of the BPKP audit report
menyatakan bahwa kurang bayar bagian stated that the underpayment of the Government
Pemerintah hanya sebesar AS$488, yang share only amounted to US$488, which represents
merupakan 34% dari jumlah pengeluaran yang 34% of the amount of expenses that should not be
tidak boleh dikurangkan sebesar AS$1.435. BPKP deductible of US$1,435. BPKP did not state that
tidak menyatakan bahwa temuan PPA dan PCO PPA and PCO findings resulted in underpayment
induk perusahaan mengakibatkan kurang bayar of the Government share.
bagian Pemerintah.
Pada tanggal 12 Maret 2018, SEGSL menerima On 12 March 2018, SEGSL received from the DGB
dari DJA surat ketetapan kurang bayar bagian the assessment letter of underpayment for the
Pemerintah sebesar AS$488. Pada tanggal Government share amounting to US$488. On
12 April 2018, SEGSL membayar jumlah tersebut 12 April 2018, SEGSL paid this amount and
dan mengajukan surat keberatan kepada DJA submitted an objection letter to DGB on 7 June
pada tanggal 7 Juni 2018. 2018.
Pada tanggal 23 Juli 2019, DJA telah menerbitkan On 23 July 2019, the DGB issued a decision letter
surat keputusan lebih bayar bagian Pemerintah for overpayment of the Government share for the
untuk tahun buku 2015. Berdasarkan surat year 2015. Based on the decision letter, the DGB
keputusan tersebut, DJA belum menyetujui has not approved the objection request from
permohonan keberatan dari SEGSL. Oleh karena SEGSL. Therefore, in response to this decision
itu, sebagai tanggapan atas surat keputusan ini, letter, management has decided to write-off the
manajemen telah memutuskan untuk prepaid amount and record the loss in profit or loss
menghapuskan jumlah dibayar di muka dan in 2019.
mencatat kerugian pada laba rugi tahun 2019.
139
Page 142
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Audit 2016 2016 audit
Pada tanggal 23 Juli 2020, SEGSL menerima On 23 July 2020, SEGSL received the 2016 audit
laporan audit tahun 2016 yang dikeluarkan oleh report issued by BPKP with findings totalling
BPKP dengan total temuan sebesar AS$3.216. US$3,216. Most of the findings pertain to the
Sebagian besar temuan berkaitan dengan dispute over the amount of PPA, PCO and other
sengketa tentang jumlah PPA, PCO dan jumlah amount of expenses that should not be deductible
biaya lain yang tidak boleh dikurangkan masing- amounting to US$1,614, US$715 and US$887,
masing sebesar AS$1.614, AS$715 dan AS$887. respectively.
Namun, kesimpulan laporan audit BPKP However, the conclusion of the BPKP audit report
menyebutkan bahwa kurang bayar bagian stated that the underpayment of Government
Pemerintah hanya sebesar AS$302, yang share only amounted to US$302, which represents
merupakan 34% dari jumlah pengeluaran yang 34% of the amount of expenses that should not be
tidak boleh dikurangkan sebesar AS$887. BPKP deductible of US$887. BPKP did not state that PPA
tidak menyatakan bahwa temuan PPA dan PCO and PCO findings resulted in underpayment of the
mengakibatkan kurang bayar bagian Pemerintah. Government share.
SEGSL menerima surat pemberitahuan kurang SEGSL received the notification letter of
bayar bagian Pemerintah dari DJA sebesar underpayment of the Government share from the
AS$302 pada tanggal 4 Agustus 2020 dan telah DGB amounted to US$302 on 4 August 2020 and
dibayarkan pada bulan September 2020. SEGSL already paid in September 2020. SEGSL agreed
menyetujui temuan sebesar AS$190 dan the findings of US$190 and recorded it as part of
mencatatnya sebagai bagian dari beban pajak income tax expense in profit or loss for the year
penghasilan pada laba rugi untuk tahun yang ended
berakhir pada tanggal 31 Desember 2020. Temuan 31 December 2020. The remaining findings of
yang tersisa sebesar AS$112 dicatat sebagai klaim US$112 recorded as prepaid Government audit
audit pemerintah dibayar di muka. Pada tanggal 28 claims. On 28 October 2020, SEGSL filed an
Oktober 2020, SEGSL mengajukan keberatan objection to the DGB totalling US$106 (partial). On
kepada DJA dengan total AS$106 (sebagian). 5 April 2021, the DGB rejected the objection
Pada tanggal 5 April 2021, DJA menolak request from SEGSL and subsequently, SEGSL
permohonan keberatan dari SEGSL dan wrote-off the remaining US$112 claim as part of
selanjutnya, SEGSL menghapus sisa tagihan income tax expense in profit or loss for the year
sebesar AS$112 sebagai bagian dari beban pajak ended
penghasilan pada laba rugi untuk tahun yang 31 December 2022.
berakhir pada tanggal 31 Desember 2022.
Audit 2017-2018 2017-2018 audit
Pada tanggal 17 Januari 2022, BPKP On 17 January 2022, the BPKP issued its
mengeluarkan laporan audit 2017-2018 dengan 2017-2018 audit report with total findings of
total temuan AS$4.748. Untuk tahun 2017 dan US$4,748. For the years 2017 and 2018, BPKP
2018, BPKP hanya menyetujui biaya PCO dengan only approved PCO charges with a total amount of
jumlah total AS$1.193 dari AS$1.971. BPKP US$1,193 out of US$1,971. BPKP argued that the
berdalih jumlah AS$778 itu tidak disetujui PGE. amount of US$778 was not approved by PGE.
Temuan lainnya termasuk PPA dan jumlah biaya Other findings include PPA and the amounts of
yang tidak boleh dikurangkan masing-masing expenses that should not be deductible amounting
sebesar AS$3.512 dan AS$458. to US$3,512 and US$458, respectively.
Namun, kesimpulan laporan audit BPKP However, the conclusion of the BPKP audit report
menyatakan bahwa kurang bayar bagian stated that the underpayment of the Government
Pemerintah hanya sebesar AS$421, yang share only amounted to US$421, which represents
merupakan 34% dari biaya yang tidak dapat 34% of the non-deductible expenses of US$1,236.
dikurangkan sebesar AS$1.236.
Selanjutnya, pada tanggal 24 Januari 2022, On 24 January 2022, SEGSL received a
SEGSL menerima surat pemberitahuan dari DJA notification letter from the DGB in relation to the
sehubungan dengan laporan audit tersebut yang audit report indicating a total underpayment of the
menunjukkan jumlah kurang bayar bagian Government share amounting to US$421.
Pemerintah sebesar AS$421.
140
Page 143
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
SEGSL setuju dengan temuan tersebut sebesar SEGSL agreed with the findings of US$150 and
AS$150 dan mencatatnya sebagai bagian dari recorded it as part of income tax expense in profit
beban pajak penghasilan dalam laba rugi untuk or loss for the year ended 31 December 2022. On
tahun yang berakhir pada tanggal 14 April 2022, SEGSL submitted an objection letter
31 Desember 2022. Pada tanggal 14 April 2022, to the DGB for the remaining US$271 and recorded
SEGSL mengajukan surat keberatan kepada DGB the payment as prepaid government audit claims.
untuk sisa AS$271 dan mencatat pembayaran
tersebut sebagai klaim audit pemerintah dibayar di
muka.
Pada tanggal 9 Oktober 2022, SEGSL menerima On 9 October 2022, SEGSL received a decision
surat keputusan dari Kemenkeu No. letter from the MoF No. S-389/MK.2/2022 rejecting
S-389/MK.2/2022 yang menolak keberatan SEGSL’s objections. As a response to this decision
SEGSL. Menanggapi surat keputusan ini, letter, management has decided to write-off the
manajemen memutuskan untuk menghapus sisa remaining US$271 prepayment. Therefore, the full
pembayaran di muka sebesar AS$271. Oleh amount of the findings of US$421 of the
karena itu, seluruh temuan sebesar AS$421 bagian Government share for 2017-2018 has been
Pemerintah untuk tahun 2017-2018 telah dicatat recorded as part of income tax expense in profit or
sebagai bagian dari beban pajak penghasilan loss for the year ended 31 December 2022.
dalam laba rugi untuk tahun yang berakhir pada
tanggal 31 Desember 2022.
PPN Ditangguhkan Deferred VAT
Pada tanggal 23 Juni 2000, SEGSL menerima On 23 June 2000, SEGSL received a tax
surat ketetapan pajak yang diterbitkan oleh kantor assessment letter issued by the BADORA tax
pajak BADORA. SEGSL diharuskan membayar office. SEGSL was required to pay all outstanding
semua PPN tangguhan yang belum dibayar deferred VAT amounting to IDR17.5 billion
sebesar Rp17,5 miliar (setara dengan AS$1,1 juta (equivalent to US$1.1 million – full amount).
– nilai penuh). SEGSL mengajukan keberatan atas SEGSL filed an objection to the assessment on
ketetapan tersebut pada tanggal 18 September 18 September 2000, which was rejected by the
2000 yang ditolak oleh DJP. Pada tanggal 27 Maret DGT. On 27 March 2002, SEGSL appealed the
2002 SEGSL mengajukan banding atas keputusan DGT’s decision to the tax court.
DJP ke Pengadilan Pajak.
Pada tanggal 7 April 2002, SEGSL menerima surat On 7 April 2002, SEGSL received a tax collection
penagihan pajak yang menetapkan denda letter assessing late payment penalties on unpaid
keterlambatan pembayaran atas PPN tangguhan deferred VAT of IDR5.6 billion – full amount
yang belum dibayar sebesar Rp5,6 miliar – nilai (equivalent to US$345 thousand – full amount) for
penuh (setara dengan AS$345 ribu – nilai penuh) the 16-month period as counted from one month
untuk periode 16 bulan terhitung sejak satu bulan after the assessment payment due date in July
setelah tanggal jatuh tempo pembayaran 2000 to the deferred VAT payment date by the
ketetapan pada bulan Juli 2000 ke tanggal SEGSL in November 2001. As required by the tax
pembayaran PPN tangguhan oleh SEGSL pada laws, SEGSL paid the deferred VAT including
bulan November 2001. Sebagaimana disyaratkan penalties amounting to IDR23.1 billion – full
oleh undang-undang perpajakan, SEGSL amount (equivalent to US$1.4 million – full
membayar PPN tangguhan termasuk denda amount).
sebesar Rp23,1 miliar – nilai penuh (setara
dengan AS$1,4 juta – nilai penuh).
Pada tanggal 26 Agustus 2002, pengadilan pajak On 26 August 2002, the tax court issued its
mengeluarkan surat keputusan yang decision letter in favour of SEGSL, which had an
memenangkan SEGSL, yang memiliki kekurangan underpayment of IDR595 million – full amount
pembayaran sebesar Rp595 juta – nilai penuh (equivalent to US$36 thousand – full amount).
(setara dengan AS$36 ribu – nilai penuh). Therefore, the amount required to be refunded by
Sehingga jumlah yang harus dikembalikan oleh DGT is IDR22.5 billion – full amount (equivalent to
DJP adalah sebesar Rp22,5 miliar – nilai penuh US$1.4 million – full amount). SEGSL recognised
(setara dengan AS$1,4 juta – nilai penuh). SEGSL an expense of IDR595 million (equivalent to
mengakui beban sebesar Rp595 juta (setara US$37 thousand – full amount) in the year the
dengan AS$37 ribu – nilai penuh) pada tahun underpayment decision was made by the tax court.
keputusan kurang bayar oleh pengadilan pajak.
141
Page 144
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Pada tanggal 22 November 2002, DJP On 22 November 2002, the DGT submitted a
mengajukan peninjauan kembali atas putusan reconsideration request for this decision to the
tersebut ke Mahkamah Agung. Pada tanggal 26 Supreme Court. On 26 January 2004, the Supreme
Januari 2004, Mahkamah Agung mengeluarkan Court issued the decision in favour of SEGSL,
keputusan yang memenangkan SEGSL, menolak rejecting the reconsideration from the DGT.
peninjauan kembali dari DJP.
Sejak tanggal putusan Mahkamah Agung tersebut, Since the date of the Supreme Court’s decision,
SEGSL telah melakukan berbagai diskusi dengan SEGSL has had various discussions with the DGT.
DJP. Seperti disebutkan di atas, Rp22,5 miliar As noted above, IDR22.5 billion (equivalent to
(setara dengan AS$1,4 juta – nilai penuh) telah US$1.4 million – full amount) has been recorded as
dicatat sebagai aset tidak lancar lain-lain di laporan part of other non-current assets in these
keuangan konsolidasian ini. consolidated financial statements.
Hingga tanggal laporan keuangan konsolidasian Up to the date of these consolidated financial
ini, manajemen terus bekerja sama dengan statements, management continues to work with its
konsultan pajaknya untuk menyiapkan serangkaian tax consultant to prepare a set of action plans to
rencana aksi yang melibatkan pemerintah untuk engage the government to recover the deferred
memulihkan saldo PPN yang ditangguhkan. VAT balances. SEGSL is still considering actions
SEGSL masih mempertimbangkan tindakan yang to be taken relating to the claim. SEGSL believes
akan diambil terkait dengan klaim tersebut. SEGSL this amount will be refunded by the tax office or
berkeyakinan jumlah tersebut akan dikembalikan reimbursed by the GOI in accordance with the
oleh kantor pajak atau diganti oleh Pemerintah Supreme Court’s decision, which was in favour of
Indonesia sesuai dengan keputusan Mahkamah SEGSL, since SEGSL has commenced paying the
Agung, yang memenangkan SEGSL, karena Government share in accordance with the terms of
SEGSL telah mulai membayar bagian Pemerintah the JOC and the applicable government regulation.
sesuai dengan ketentuan JOC dan peraturan As such, no provision for non-recovery of deferred
pemerintah yang berlaku. Dengan demikian, tidak VAT receivables has been recognised in these
ada provisi untuk tidak terpulihkannya piutang PPN consolidated financial statements.
tangguhan yang diakui dalam laporan keuangan
konsolidasian ini.
SEGSPL SEGSPL
Sampai dengan tanggal penyelesaian laporan As of the completion date of these consolidated
keuangan konsolidasian ini, SEGSPL memiliki financial statements, SEGSPL has various audit
berbagai temuan audit dari auditor Pemerintah findings from the Government auditors for the
untuk periode 2004-2018 sebesar AS$803 terkait period from 2004-2018 amounting to US$803
temuan PPA dan AS$22 terkait temuan lainnya. relating to PPA findings and US$22 relating to
Manajemen berkeyakinan bahwa, sesuai dengan other findings. Management believes that, as per
peraturan perpajakan Indonesia, PPA Indonesian tax regulations, the PPA is categorised
dikategorikan sebagai biaya yang dikeluarkan oleh as a cost incurred by SEGSPL to obtain, maintain
SEGSPL untuk memperoleh, memelihara dan and manage its revenue. On that basis,
mengelola pendapatannya. Atas dasar itu, management believes that the PPA should be
manajemen berkeyakinan bahwa PPA harus classified as a deductible cost, hence, it should be
diklasifikasikan sebagai biaya yang dapat treated as a deduction from the Government share
dikurangkan, sehingga harus diperlakukan sebagai calculation. Notwithstanding the findings pertaining
pengurang perhitungan bagian Pemerintah. to the PPA, the Government auditors have never
Terlepas dari temuan terkait PPA, auditor factored in the findings relating to PPA as an
Pemerintah tidak pernah memperhitungkan underpayment of the Government share. If the
temuan terkait PPA sebagai kurang bayar bagian findings relating to PPA materialise, the income tax
Pemerintah. Jika temuan yang berkaitan dengan expense will increase by US$803.
PPA terwujud, beban pajak penghasilan akan
meningkat sebesar AS$803.
Sehubungan dengan temuan auditor Pemerintah With regards to the other findings of the
lainnya, DJA menerbitkan Surat Kurang Bayar Government auditors, the DGB issued an
setoran bagian Pemerintah periode 2013-2016 underpayment of the Government share letter for
sebesar AS$2 yang telah dibayarkan oleh the period from 2013-2016, totalling US$2, which
SEGSPL. Jika temuan yang tersisa terwujud, has been paid by SEGSPL. If the remaining
beban pajak penghasilan akan meningkat sebesar findings materialise, the income tax expense will
AS$5. increase by US$5.
142
Page 145
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Berikut rincian hasil pemeriksaan yang dilakukan The following are the details of the results of the
oleh Pemeriksa Pemerintah pada setiap tahun audits conducted by the Government auditors for
anggaran: each fiscal year:
Audit 2008-2014 2008-2014 audit
SEGSPL memiliki berbagai temuan audit dari SEGSPL has various audit findings from the
auditor Pemerintah untuk periode 2008-2014 Government auditors for the period from 2008-
sebesar AS$620 terkait temuan PPA dan AS$16 2014 amounting to US$620 relating to PPA
terkait temuan lainnya, namun BPKP tidak findings and US$16 related to other findings, but
menyatakan temuan tersebut akan mengakibatkan BPKP did not declare these findings would result in
kurang bayar bagian Pemerintah. Jika terwujud, the underpayment of the Government share. If they
dampak temuan terkait PPA akan meningkatkan materialise, the impact of the finding relating to
bagian Pemerintah sebesar AS$620 dan dampak PPA will increase the Government share by
temuan lainnya akan meningkatkan bagian US$620 and the impact of other findings will
Pemerintah sebesar AS$5. increase the Government share by US$5.
Audit 2015 2015 audit
Pada tanggal 15 September 2017, BPKP On 15 September 2017, BPKP issued its 2015
mengeluarkan laporan audit 2015 dengan total audit report with findings totalling US$116. Most of
temuan sebesar AS$116. Sebagian besar temuan the findings pertain to the dispute over the amount
berkaitan dengan sengketa jumlah PPA sebesar of PPA amounting to US$110 and other findings
AS$110 dan temuan lainnya sebesar AS$6. amounting to US$6.
Namun, kesimpulan laporan audit BPKP However, the conclusion of the BPKP audit report
menyatakan bahwa kurang bayar bagian stated that the underpayment of the Government
Pemerintah hanya sebesar AS$2, yang merupakan share only amounted to US$2, which represents
34% dari jumlah pengeluaran yang tidak boleh 34% of the amount of expenses that should not be
dikurangkan sebesar AS$6. BPKP tidak deductible of US$6. BPKP did not state that the
menyatakan bahwa temuan PPA mengakibatkan PPA finding resulted in underpayment of the
kurang bayar bagian Pemerintah. Government share.
Pada tanggal 13 Maret 2018, SEGSPL menerima On 13 March 2018, SEGSPL received from the
dari DJA surat ketetapan kurang bayar bagian DGB the assessment letter of underpayment of the
Pemerintah sebesar AS$2. Manajemen telah Government share amounting to US$2.
memutuskan untuk menghapuskan jumlah dibayar Management has decided to write-off the prepaid
di muka dan mencatat kerugian pada laba rugi amount and record the loss in profit or loss in 2019.
tahun 2019.
Audit 2016 2016 audit
Pada tanggal 23 Juli 2020, SEGSPL menerima On 23 July 2020, SEGSPL received the 2016 audit
laporan audit tahun 2016 yang dikeluarkan oleh report issued by BPKP with findings totalling
BPKP dengan total temuan sebesar AS$73 terkait US$73, related to PPA. There is no assessment
PPA. Tidak ada surat penilaian kurang bayar letter of underpayment of the Government share
bagian Pemerintah dari DJA terkait temuan audit from the DGB related to SEGSPL audit findings.
SEGSPL. Namun, SEGSPL belum menerima surat However, SEGSPL has not yet received the
pemberitahuan kurang bayar bagian Pemerintah notification letter of underpayment of the
dari DJA terkait temuan audit tersebut. Manajemen Government share from the DGB related to the
berpendapat bahwa temuan audit tersebut tidak audit findings. Management believes that the audit
berdasar karena SEGSPL telah secara konsisten findings are without merit as SEGSPL has
menerapkan kerangka akuntansi sebagaimana consistently applied the accounting framework as
diatur dalam JOC. stipulated in the JOC.
2017-2018 Audit 2017-2018 audit
Pada tanggal 17 Januari 2022, BPKP menerbitkan On 17 January 2022, the BPKP issued its
laporan audit 2017-2018 tanpa temuan audit. 2017-2018 audit report with no audit findings.
143
Page 146
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
b. Pendaftaran karbon kredit b. Carbon credits registration
SEGWWL SEGWWL
Pada tahun 2011, SEGWWL mengadakan In 2011, SEGWWL entered into a Clean
Perjanjian Proyek Mekanisme Pembangunan Development Mechanism (“CDM”) Project
Bersih (“MPP”) dengan Bank Standard Chartered Agreement with Standard Chartered Bank (“SCB”)
(“SCB”) dan Sindicatum Carbon Capital Limited and Sindicatum Carbon Capital Limited and pre-
dan Perjanjian pra-registrasi VCU dengan registration VCU Services Agreement with
PT Sindicatum Carbon Capital Indonesia (“SCCI”) PT Sindicatum Carbon Capital Indonesia (“SCCI”)
(secara bersama-sama, “Perjanjian”) untuk (collectively, the “Agreements”) to execute Wayang
melaksanakan proyek pembangkit listrik tenaga Windu Phase 2 117 MW geothermal power station
panas bumi Wayang Windu Tahap 2 117 MW (the “Project”) located in West Java, Indonesia.
(“Proyek”) yang berlokasi di Jawa Barat,
Indonesia.
CER CER
Proyek ini terdaftar sebagai proyek CDM oleh The Project was registered as a CDM project by
United Nations Framework Convention on the the United Nations Framework Convention on
Climate Change (“UNFCCC”) pada tanggal Climate Change (“UNFCCC”) on 2 December 2010
2 Desember 2010 dengan nomor referensi 3193. with reference number 3193. As stated in the
Sebagaimana dinyatakan dalam Perjanjian, Agreements, SEGWWL agreed to carry out the
SEGWWL setuju untuk melaksanakan Proyek. Project, which is expected to result in the reduction
yang diharapkan menghasilkan pengurangan of greenhouse gas emissions amounting to
emisi gas rumah kaca sekitar setara dengan approximately 794,832 metric tonnes CO2
794.832 metrik ton CO2 per tahun. Tujuan Proyek equivalent per annum. The purpose of this Project
ini adalah untuk menghasilkan listrik is to generate power using a reliable and
menggunakan sumber daya yang andal dan renewable resource in lieu of power generation by
terbarukan sebagai pengganti pembangkit listrik a more greenhouse gas intensive fuel/source. The
dengan bahan bakar/sumber yang lebih intensif Project will reduce greenhouse gas emissions
gas rumah kaca. Proyek ini akan mengurangi through the displacement of fossil fuel electricity
emisi gas rumah kaca melalui penggantian generation with a clean, renewable energy source.
pembangkit listrik berbahan bakar fosil dengan
sumber energi yang bersih dan terbarukan.
Periode kredit untuk Proyek adalah dari The crediting period for the Project is from
2 Desember 2010 sampai dengan 1 Desember 2 December 2010 until 1 December 2017 and can
2017 dan dapat diperpanjang dua kali, masing- be extended twice, each for a seven-year period,
masing selama tujuh tahun, tergantung pada depending on UNFCCC approval. On 13 March
persetujuan UNFCCC. Pada tanggal 13 Maret 2020, SEGWWL successfully extended the
2020, SEGWWL berhasil memperpanjang periode crediting period to 1 December 2024.
kredit hingga 1 Desember 2024.
Pada tanggal 15 Mei 2015 dan 29 Mei 2019, On 15 May 2015 and 29 May 2019, UNFCCC
UNFCCC menerbitkan masing-masing 1.505.313 issued 1,505,313 CERs and 1,681,431 CERs,
CER dan 1.681.431 CER. SEGWWL telah menjual respectively. SEGWWL sold 2,600,000 CERs
2.600.000 CER yang berjumlah AS$1.711 selama totalling US$1,711 during 2021. Subsequently on
tahun 2021. Selanjutnya pada tanggal 22 Juli 22 July 2022, UNFCCC issued 2,237,274 CERs.
2022, UNFCCC mengeluarkan 2.237.274 CER. As of 30 June 2025, SEGWWL’s remaining CER
Per 30 Juni 2025, sisa saldo CER SEGWWL balance is 2,343,054 CERs.
adalah 2.343.054 CER.
VCU VCU
Pada tanggal 27 Mei 2011, SEGWWL On 27 May 2011, SEGWWL entered into a VCU
menandatangani Perjanjian Layanan VCU dengan Services Agreement with Sindicatum Carbon
Sindicatum Carbon Capital (South East Asia) Pte. Capital (South East Asia) Pte. Limited (“SCC”) to
Limited (“SCC”) untuk memonetisasi 1.406.789 monetise 1,406,789 VCUs by appointing SCC to
VCU dengan menunjuk SCC untuk mengatur arrange for the registration of the project and find
pendaftaran proyek dan mencari pembeli untuk buyers for the VCUs.
VCU.
144
Page 147
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Pendapatan karbon kredit disajikan sebagai Carbon credit revenue is presented as part of
bagian dari “Pendapatan dari kontrak dengan “Revenue from contracts with customers” in the
pelanggan” dalam laporan laba rugi dan consolidated statements of profit or loss and other
penghasilan komprehensif lain konsolidasian. comprehensive income.
Per 30 Juni 2025, tidak terdapat sisa saldo VCU. As of 30 June 2025, there is no remaining VCU
balance.
SEGD-II SEGD-II
Pada tahun 2006, SEGD-II telah mendaftarkan In 2006, SEGD-II registered the Darajat Unit 3
proyek Darajat Unit 3 (“Proyek DRJ3”) dengan project (“DRJ3 Project”) with a capacity of 110 MW
kapasitas 110 MW sebagai proyek CDM. as a CDM project.
CER CER
Proyek DRJ3 terdaftar sebagai proyek CDM oleh The DRJ3 Project was registered as a CDM project
UNFCCC pada tanggal 11 Desember 2006 by the UNFCCC on 11 December 2006 with
dengan nomor referensi 0673. SEGD-II reference number 0673. SEGD-II is implementing
melaksanakan Proyek DRJ3 yang diharapkan the DRJ3 Project which is expected to result in a
menghasilkan pengurangan emisi gas rumah kaca reduction in greenhouse gas emissions of around
sekitar setara dengan 652.173 metrik ton CO2 per 652,173 metric tonnes of CO2 equivalent per year.
tahun. Proyek DRJ3 didirikan untuk berkontribusi The DRJ3 Project was established to contribute to
pada pasokan listrik dalam sistem jaringan the supply of electricity in the Java, Madura and
terinterkoneksi Jawa, Madura dan Bali (“JAMALI”) Bali (“JAMALI”) interconnected network system
dan menghasilkan energi dari sumber yang bersih and generate energy from clean and
dan ramah lingkungan. environmentally friendly sources.
Pada tanggal 18 Agustus 2017 dan 31 Maret 2022, On 18 August 2017 and 31 March 2022, the
UNFCCC menerbitkan masing-masing 801.111 UNFCCC issued 801,111 CERs and 2,006,875
CER dan 2.006.875 CER untuk Proyek DRJ3. CERs for the DRJ3 Project, respectively. In 2021,
Pada tahun 2021, SEGD-II telah menjual CER SEGD-II has sold 1,550,000 CERs and in 2022 it
sebanyak 1.550.000 CER dan di tahun 2022 has sold 1,100,000 CERs. As of 30 June 2025, the
berhasil terjual CER sebanyak 1.100.000 CER. remaining balance of SEGD-II CERs was
Pada tanggal 30 Juni 2025, sisa saldo CER 1,761,227 CERs.
SEGD-II adalah 1.761.227 CER.
SEGS SEGS
GS VER GS VER
Pada tanggal 16 Januari 2025, SEGS On 16 January 2025, SEGS registered the Salak
mendaftarkan Pembangkit Listrik Binary Salak Brine Heat Recovery Binary Power Plant (the
Brine Heat Recovery (“Proyek Salak BHR”) yang “Salak BHR Project”) located in West Java,
berlokasi di Jawa Barat, Indonesia, dengan Indonesia, with an installed capacity of 16.15 MW,
kapasitas terpasang 16,15 MW, sebagai proyek as a Gold Standard project with the identification
Gold Standard dengan nomor identifikasi number GS11719. The Salak BHR Project is
GS11719. Proyek Salak BHR diperkirakan akan expected to result in a reduction in greenhouse gas
menghasilkan pengurangan emisi gas rumah kaca emissions of around 105,426 metric tonnes of CO2
sekitar 105.426 metrik ton CO2 ekuivalen per equivalent per year. The purpose of the Salak BHR
tahun. Tujuan dari Proyek Salak BHR adalah untuk Project is to generate electricity by utilizing the heat
menghasilkan listrik dengan memanfaatkan panas from separated brine solution and contribute to the
dari larutan brine yang telah dipisahkan dan supply of clean and environmentally friendly
berkontribusi terhadap pasokan listrik yang bersih electricity in the Java, Madura and Bali (“JAMALI”)
dan ramah lingkungan di sistem jaringan interconnected network system. The crediting
interkoneksi Jawa, Madura, dan Bali (“JAMALI”). period for the Salak BHR Project is from 1 January
Periode kredit emisi untuk Proyek Salak BHR 2025 to 31 December 2029, and can be extended
dimulai dari 1 Januari 2025 hingga 31 Desember twice, each for a five-year period.
2029, dan dapat diperpanjang dua kali, masing-
masing untuk jangka waktu lima tahun.
145
Page 148
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
SBE SBE
Pada tahun 2024, SBE telah menandatangani In 2024, SBE entered into a Carbon Services
Perjanjian Jasa Karbon (Carbon Services Agreement with Ultimate Carbon B.V. (“UC”) to
Agreement) dengan Ultimate Carbon B.V. (“UC”) exclusively manage, maintain, take custody of,
untuk secara eksklusif mengelola, memelihara, hold within the SBE’s registry accounts or direct
menjaga, menyimpan dalam akun registri SBE SBE’s account or personnel related to such sales
atau mengarahkan akun atau personel SBE yang as applicable, and to sell any environmental
terkait dengan penjualan sebagaimana relevan, attribute certificate or energy attribute certificate
serta menjual setiap sertifikat atribut lingkungan generated by or attributable to the Sidrap Wind
atau sertifikat atribut energi yang dihasilkan oleh Energy Project Phase 1 (the “SBE Project”), a wind
atau dikaitkan dengan Proyek Energi Angin Sidrap power plant with a capacity of 75 MW and located
Tahap 1 (“Proyek SBE”), yaitu suatu pembangkit in South Sulawesi, Indonesia.
listrik tenaga angin dengan kapasitas 75 MW yang
berlokasi di Sulawesi Selatan, Indonesia.
GS VER GS VER
Pada tahun 2019, UPC Renewables Asia I Ltd In 2019, UPC Renewables Asia I Ltd registered the
mendaftarkan Proyek SBE sebagai proyek Gold SBE Project as a Gold Standard project with the
Standard dengan nomor identifikasi GS4813. identification number GS4813. The SBE Project
Proyek SBE kemudian diakuisisi oleh BWE pada was later acquired by BWE on 2 April 2024, which
tanggal 2 April 2024, termasuk pengalihan included transfer of carbon credits ownership.
kepemilikan kredit karbon.
Proyek SBE diperkirakan akan menghasilkan The SBE Project is expected to result in a reduction
pengurangan emisi gas rumah kaca sekitar in greenhouse gas emissions of around 141,248
141.248 metrik ton CO2 ekuivalen per tahun. metric tonnes of CO2 equivalent per year. The
Tujuan dari Proyek SBE adalah untuk purpose of the SBE Project is to generate
menghasilkan listrik dengan memanfaatkan electricity by utilizing wind power and contribute to
tenaga angin serta berkontribusi pada pasokan the supply of clean and environmentally friendly
listrik yang bersih dan ramah lingkungan dalam electricity in the South Sulawesi (“SULBAGSEL”)
sistem interkoneksi Sulawesi Selatan interconnected system. The crediting period for the
(“SULBAGSEL”). Periode kredit untuk Proyek SBE SBE Project is 1 March 2018 to 29 February 2028
adalah dari 1 Maret 2018 hingga 29 Februari 2028 which cannot be extended.
dan tidak dapat diperpanjang.
Pada tanggal 21 Oktober 2019, 1 Juli 2021. dan 25 On 21 October 2019, 1 July 2021, and 25 February
Februari 2022, Gold Standard menerbitkan 2022, Gold Standard issued 135,388, 252,115,
masing-masing 135,388, 252.115, dan 137.748 and 137,748 VERs respectively. As of
VER. Pada tanggal 30 Juni 2025, tidak terdapat 30 June 2025, there is no remaining VER balance.
saldo VER yang tersisa.
c. Perjanjian penyelesaian penjualan uap kepada c. Settlement agreement on steam sales to
PT PLN Indonesia Power (“PT PIP”) – anak PT PLN Indonesia Power (“PT PIP”) – a
perusahaan PLN subsidiary of PLN
Kelompok Kontraktor Darajat memiliki sengketa The Darajat Contractor Group has had an ongoing
yang sedang berlangsung tentang penjualan uap dispute on steam sales between SEGDL and
antara SEGDL dan PT PIP sejak 2018. Shutdown PT PIP since 2018. An unplanned shutdown
yang tidak direncanakan terjadi di Darajat Unit-1 occurred in PT PIP’s Darajat Unit-1 due to turbine
PT PIP karena kerusakan turbin. PT PIP selaku breakdown. PT PIP as the operator of the power
operator PLTU mengindikasikan bahwa kualitas plant, indicated that the steam quality delivered by
uap yang dialirkan oleh SEGDL menjadi faktor SEGDL was the main factor that caused the turbine
utama penyebab rusaknya turbin. Oleh karena itu, damage. As such, PT PIP stopped the payment to
PT PIP menghentikan pembayaran kepada SEGDL of the invoices for the period from May to
SEGDL atas tagihan untuk periode Mei hingga September 2018 totalling US$7.9 million – full
September 2018 sebesar AS$7,9 juta – nilai amount.
penuh.
146
Page 149
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Menurut Pasal 5.1 dan Pasal 11.3 ESC Darajat, According to Article 5.1 and Article 11.3 of the
selama periode di mana PLN tidak dapat Darajat ESC, during the period where PLN is unable
mengambil semua uap yang dapat dikirim dari to take all steam that could be delivered from
SEGDL, PLN harus membayar jumlah kewajiban SEGDL, PLN shall pay the “Take or Pay” obligation
"Ambil atau Bayar" kepada SEGDL. Selama saat amount to SEGDL. During any time of dispute, both
sengketa, kedua belah pihak akan terus parties shall continue to carry out their
melaksanakan tanggung jawab mereka sesuai responsibilities pursuant to the Darajat ESC. Hence,
dengan ESC Darajat. Oleh karena itu, manajemen the management believes that SEGDL is entitled for
berkeyakinan bahwa SEGDL berhak atas the full payments from PT PIP for the outstanding
pembayaran penuh dari PT PIP atas tagihan invoices from May 2018 to September 2018.
terutang dari Mei 2018 sampai dengan September
2018.
Pada tanggal 21 Desember 2021, manajemen On 21 December 2021, management reached an
mencapai sebuah kesepakatan dengan PT PIP agreement with PT PIP and PLN on the settlement
dan PLN tentang pengaturan penyelesaian dalam arrangement in the form of future excess steam
bentuk pengiriman uap berlebih di masa delivery (beyond “Take or Pay” level) from SEGDL
mendatang (di luar level “Take or Pay”) dari to PLN with a total accumulated steam volume of
SEGDL ke PLN dengan total akumulasi volume 159,890,000 kWh over approximately 42 months
uap sebesar 159.890.000 kWh selama kurang starting December 2022, priced at the weighted
lebih 42 bulan mulai Desember 2022, dengan average energy price at the time of the dispute i.e.
harga rata-rata tertimbang harga energi pada saat May – September 2018.
sengketa yaitu Mei – September 2018.
Karena jangka waktu penyelesaian yang lama, Due to the long settlement period, as of
pada tanggal 30 Juni 2025 dan 31 Desember 30 June 2025 and 31 December 2024, the Darajat
2024, Kelompok Kontraktor Darajat mengakui Contractor Group recognised a provision for ECL
provisi untuk ECL masing-masing sebesar AS$18 amounting to US$18 and US$35, respectively in the
dan AS$35, secara berurutan, di laporan posisi consolidated statements of financial position against
keuangan konsolidasian terhadap saldo piutang the trade receivables balance.
usaha.
d. Jaminan akuisisi Salak-Darajat d. Guarantees of Salak-Darajat acquisitions
Pada tanggal 22 Desember 2016, SEG-SD BV On 22 December 2016, SEG-SD B.V. signed a
menandatangani perjanjian jual beli saham share sale and purchase agreement (“Salak-
(“Salak-Darajat SPA”) dengan Chevron Darajat Darajat SPA”) with Chevron Darajat Holdings, Ltd.,
Holdings, Ltd., Chevron Geothermal Indonesia Chevron Geothermal Indonesia Holdings, Ltd., and
Holdings, Ltd., dan Chevron Geothermal Salak Chevron Geothermal Salak Holdings, Ltd. (the
Holdings, Ltd. (para “Penjual”) untuk mengakuisisi “Sellers”) to acquire 100% of the Sellers shares in
100% saham para Penjual di CDL, CGI, dan CGS. CDL, CGI, and CGS. The Buyer Direct Shareholder
Penjamin Pemegang Saham Langsung Pembeli Guarantors of the transaction are SEGHPL,
dari transaksi tersebut adalah SEGHPL, Holdings Holdings B.V. and ACEHI, for which the guarantees
BV dan ACEHI, yang jumlah jaminannya tidak are unlimited in amount.
terbatas.
Penjamin Kelompok Pembeli adalah SEGHPL, The Buyer Group Guarantors are SEGHPL,
SEGPL, EGCO dan AC Energy Holdings, Inc., SEGPL, EGCO and AC Energy Holdings, Inc., for
dimana kewajiban maksimum secara keseluruhan which the aggregate maximum liability until
hingga 31 Desember 2057 dibatasi sebesar 31 December 2057 is capped at a total amount of
AS$200.000.000 – nilai penuh. Hingga US$200,000,000 – full amount. Up to
31 Desember 2049, jaminan SEGHPL, SEGPL, 31 December 2049, SEGHPL’s, SEGPL’s, EGCO’s
EGCO dan AC Energy Holdings, Inc. dibatasi and AC Energy Holdings, Inc.’s guarantees are
masing-masing sebesar AS$54.820.000 – nilai capped at US$54,820,000 – full amount,
penuh, AS$81.800.000 – nilai penuh, US$81,800,000 – full amount, US$23,780,000 –
AS$23.780.000 – nilai penuh dan AS$39.600.000 full amount and US$39,600,000 – full amount,
– nilai penuh. Dari 1 Januari 2050 hingga respectively. From 1 January 2050 to
31 Desember 2057, jaminan SEGHPL, SEGPL 31 December 2057, SEGHPL’s, SEGPL’s and AC
dan AC Energy Holdings, Inc. dibatasi masing- Energy Holdings, Inc.’s guarantees are capped at
masing sebesar AS$62.220.000 – nilai penuh, US$62,220,000 – full amount, US$92,840,000 –
AS$92.840.000 – nilai penuh dan AS$44.940.000 full amount and US$44,940,000 – full amount,
– nilai penuh, yang merupakan Proporsi Ekuitas respectively, representing the Buyer Group
Kelompok Pembeli dari masing-masing Penjamin Equity Proportion of each of the Buyer Group
Kelompok Pembeli. Guarantors.
147
Page 150
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Jaminan mencakup semua jumlah yang harus The guarantee covers all amounts which SEG-SD
dibayar oleh SEG-SD BV sebagai pembeli B.V. as the buyer is liable to pay under or in
berdasarkan atau sehubungan dengan dokumen relation to the transaction documents, which
transaksi, yang terutama terkait dengan ketentuan primarily relates to the "clean-break" indemnity
ganti rugi "clean-break" berdasarkan pasal 8 provision under clause 8 of Salak-Darajat SPA
Salak-Darajat SPA tertanggal 22 Desember 2016. dated 22 December 2016. Under this provision,
Berdasarkan ketentuan ini, SEG-SD BV akan SEG-SD B.V. shall indemnify the Sellers for all
mengganti rugi para Penjual untuk semua losses resulting from or in connection with the
kerugian yang diakibatkan atau sehubungan target companies (CDL, CGI and CGS) and their
dengan perusahaan target (CDL, CGI dan CGS) operations. An example of a claim that the Sellers
dan operasi mereka. Contoh klaim yang dapat may make would be a claim under the indemnity
dibuat oleh para Penjual adalah klaim berdasarkan provision if the Sellers are required to pay any
ketentuan ganti rugi jika para Penjual diwajibkan taxes, decommissioning costs or any other costs
untuk membayar pajak, biaya penonaktifan, atau or losses pertaining to the Group companies and
biaya atau kerugian lainnya yang terkait dengan their operations.
perusahaan Grup dan operasinya.
SEGHPL akan menahan sejumlah AS$5.000.000 SEGHPL will retain US$5,000,000 – full amount
– nilai penuh dari Phoenix Power B.V. (“Phoenix”) from an assignment by Phoenix Power B.V.
atas dividen dan distribusi serupa lainnya yang (“Phoenix”) of dividends and other similar
terhutang kepada Phoenix oleh masing-masing distributions payable to Phoenix by each of
SEGPL dan Star Phoenix Geothermal B.V. yang SEGPL and Star Phoenix Geothermal B.V. with
berlaku efektif sejak 2040 hingga berakhirnya effect from 2040 to the expiry of the last of the
periode JOC yang terakhir, atau jika dividen JOCs, or if such dividends and other similar
tersebut dan distribusi serupa lainnya tidak distributions do not amount to US$5,000,000 – full
berjumlah AS$5.000.000 – nilai penuh, oleh amount, by a payment of the shortfall by Phoenix
pembayaran kekurangan oleh Phoenix kepada to SEGHPL. SEGHPL will be required to utilise
SEGHPL. SEGHPL akan diharuskan untuk such US$5,000,000 – full amount towards
menggunakan AS$5.000.000 – nilai penuh payment of any claim made by the Sellers against
tersebut untuk pembayaran klaim apa pun yang the Buyer Direct Shareholder Guarantors
dibuat oleh para Penjual terhadap Penjamin between 1 January 2050 and 31 December 2057
Pemegang Saham Langsung Pembeli antara or from 1 January 2058 onwards.
1 Januari 2050 dan 31 Desember 2057 atau mulai
1 Januari 2058 dan seterusnya.
Selain itu, SEGHPL telah menerima jaminan In addition, SEGHPL has received a guarantee in
sejumlah AS$5.000.000 – nilai penuh dari AC the amount of US$5,000,000 – full amount from
Energy Holdings, Inc. terhadap pembayaran klaim AC Energy Holdings, Inc. towards payment of any
apa pun yang dibuat oleh para Penjual terhadap claim made by the Sellers against the Buyer
Penjamin Pemegang Saham Langsung Pembeli Direct Shareholder Guarantors from 1 January
mulai 1 Januari 2058 dan seterusnya. 2058 onwards.
Selanjutnya, Penjamin Kelompok Pembeli dan Furthermore, the Buyer Group Guarantors and
Penjamin Pemegang Saham Langsung Pembeli the Buyer Direct Shareholder Guarantors should
harus mempertahankan Kekayaan Bersih maintain a collective Tangible Net Worth (“TNW”)
Berwujud (“KBB”) kolektif masing-masing sebesar of US$2,500,000,000 – full amount and
AS$2.500.000.000 – nilai penuh dan US$500,000,000 – full amount, respectively. If the
AS$500.000.000 – nilai penuh. Jika Penjamin Buyer Group Guarantors or the Buyer Direct
Kelompok Pembeli atau Penjamin Pemegang Shareholder Guarantors fail to maintain the
Saham Langsung Pembeli gagal relevant required aggregate TNW, the Seller may
mempertahankan KBB agregat yang disyaratkan, require the defaulting Buyer Group Guarantor
para Penjual dapat meminta Penjamin Kelompok and/or the defaulting Buyer Direct Shareholder
Pembeli dan/atau Penjamin Pemegang Saham Guarantor to provide either:
Langsung Pembeli yang gagal untuk memberikan
salah satu dari:
a) jaminan yang dilaksanakan dari afiliasi a) a duly executed guarantee from an affiliate of
Penjamin Pembeli gagal yang akan the defaulting Buyer Guarantor that would
memungkinkan Penjamin Kelompok Pembeli enable the Buyer Group Guarantors or Buyer
atau Penjamin Pemegang Saham Langsung Direct Shareholder Guarantors, as applicable,
Pembeli, sebagaimana berlaku, untuk secara to collectively satisfy the TNW thresholds
kolektif memenuhi ambang batas KBB yang mentioned above; or
disebutkan di atas; atau
b) satu atau lebih jaminan kredit, dalam jumlah b) one or more letters of credit, in an amount
yang sama dengan kekurangannya. equal to the shortfall.
148
Page 151
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Pada tanggal 16 November 2022, SEGHPL On 16 November 2022, SEGHPL signed a Share
menandatangani Perjanjian Pembelian Saham Purchase Agreement with Phoenix and EGCO, to
dengan Phoenix dan EGCO, untuk mengakuisisi acquire an additional 20% interest in SEGPL and
20% saham tambahan di SEGPL dan 30,25% a 30.25% interest in Star Phoenix Geothermal JV
saham di Star Phoenix Geothermal JV B.V. B.V. (now known as Star Energy Geothermal
(sekarang dikenal sebagai Star Energy Netherlands B.V.). As a result of this transaction,
Geothermal Netherlands B.V.). Sebagai hasil dari SEGHPL will assume:
transaksi ini, SEGHPL akan menanggung:
a. bagian EGCO dari Penjamin Kelompok a. EGCO’s portion of the Buyer Group
Pembeli sampai batas AS$23.780.000 – nilai Guarantee up to a cap of US$23,780,000 –
penuh, sampai dengan 31 Desember 2049; full amount, up to 31 December 2049;
b. kewajiban EGCO untuk mendanai
AS$5.000.000 pertama – jumlah penuh dari b. EGCO's liability to fund the first US$5,000,000
setiap klaim oleh para Penjual terhadap – full amount of any claim by the Sellers
Penjamin Pemegang Saham Langsung against the Buyer Direct Shareholders from
Pembeli dari 1 Januari 2050 hingga 1 January 2050 to 31 December 2057 and for
31 Desember 2057 dan untuk periode dari the period from 1 January 2058 onwards; and
1 Januari 2058 dan seterusnya; dan
c. porsi KBB EGCO sebesar AS$800.000.000 – c. EGCO's TNW portion of US$800,000,000 – full
jumlah penuh hingga 31 Maret 2027 dan amount until 31 March 2027 and
AS$712.500.000 – nilai penuh mulai US$712,500,000 – full amount from 1 April
1 April 2027. 2027.
Grup telah menilai bahwa kemungkinan penarikan The Group has assessed that the probability of
jaminan sangat kecil berdasarkan hasil operasi the guarantees being called is remote based on
Salak-Darajat hingga saat ini, dan fakta bahwa the results of the Salak-Darajat operations to
KBB kolektif berada di atas ambang batas date, and the fact that the collective TNW is above
minimum. Oleh karena itu Grup tidak berkeyakinan the minimum threshold. The Group therefore does
bahwa penyisihan untuk jaminan tersebut not believe that a provision for such guarantees is
diperlukan pada tanggal 30 Juni 2025 dan 31 necessary as of 30 June 2025 and 31 December
Desember 2024. 2024.
e. Jaminan akuisisi Sekincau e. Guarantees of Sekincau acquisition
Pada tanggal 22 Desember 2016, SEG-SD B.V. On 22 December 2016, SEG-SD B.V. signed a
menandatangani perjanjian jual beli saham share sale and purchase agreement (“Sekincau
(“Sekincau SPA”) dengan Chevron Global Energy, SPA”) with Chevron Global Energy, Inc. to acquire
Inc. untuk mengakuisisi 100% saham CVX di 100% of CVX’s shares in PT Chevron Geothermal
PT Chevron Geothermal Suoh Sekincau (yaitu, Suoh Sekincau (i.e. representing 95% ownership).
mewakili 95% kepemilikan). Pembeli Pemegang The Buyer Direct Shareholder Guarantors of the
Saham Langsung Penjamin dari transaksi transaction are Holdings B.V. and ACEHI, for
tersebut adalah Holdings B.V. dan ACEHI, dimana which the guarantees are unlimited. The Buyer
jaminannya tidak terbatas. Penjamin Grup Group Guarantors are SEGHPL, SEGPL, EGCO
Pembeli adalah SEGHPL, SEGPL, EGCO dan AC and AC Energy Holdings, Inc.
Energy Holdings, Inc.
Kewajiban maksimum agregat hingga The aggregate maximum liability until 31
31 Desember 2037 dibatasi sebesar December 2037 is capped at a total amount of
AS$1.500.000 – nilai penuh. Jaminan SEGHPL US$1,500,000 – full amount. SEGHPL’s and
dan SEGPL dibatasi masing-masing sebesar SEGPL’s guarantees are capped at US$411,150 –
AS$411.150 – nilai penuh dan AS$613.500 – nilai full amount and US$613,500 – full amount,
penuh, sampai dengan 31 Desember 2037, respectively, up to 31 December 2037,
mewakili Proporsi Ekuitas Grup Pembeli masing- representing the Buyer Group Equity Proportion of
masing SEGHPL dan SEGPL. each of SEGHPL and SEGPL.
Penjamin Pemegang Saham Langsung Pembeli The Buyer Direct Shareholder Guarantors and the
dan Penjamin Grup Pembeli secara bersama- Buyer Group Guarantors are collectively referred
sama disebut sebagai Penjamin Pembeli. to as Buyer Guarantors.
149
Page 152
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Jaminan mencakup semua jumlah yang The guarantee covers all amounts which SEG-SD
SEG-SD B.V. sebagai pembeli bertanggung jawab B.V. as the buyer is liable to pay under or in
untuk membayar berdasarkan atau sehubungan relation to the transaction documents, which
dengan dokumen transaksi, yang terutama primarily relates to the “clean-break” indemnity
berkaitan dengan ketentuan ganti rugi “clean- provision under clause 8 of the Sekincau SPA
break” berdasarkan klausul 8 dari Sekincau SPA dated 22 December 2016. Under this provision,
tertanggal 22 Desember 2016. Berdasarkan which SEG-SD B.V. shall indemnify CVX for all
ketentuan ini, SEG-SD B.V. akan memberikan losses resulting from or in connection with the
ganti rugi kepada CVX untuk semua kerugian target company (PT Chevron Geothermal Suoh
yang diakibatkan dari atau sehubungan dengan Sekincau) and its operations. An example of a
perusahaan target (PT Chevron Geothermal Suoh claim that CVX may make would be a claim under
Sekincau) dan operasinya. Contoh klaim yang the indemnity provision if CVX is required to pay
dapat dibuat oleh CVX adalah klaim berdasarkan any taxes, decommissioning costs or any other
ketentuan ganti rugi jika CVX diharuskan costs or losses pertaining to the Group and its
membayar pajak, biaya penonaktifan, atau biaya operations.
atau kerugian lain apa pun yang berkaitan dengan
Grup dan operasinya.
Grup telah menilai bahwa kemungkinan penarikan The Group has assessed that the probability of the
jaminan sangat kecil berdasarkan hasil operasi guarantees being called is remote based on the
Sekincau hingga saat ini. Oleh karena itu Grup results of the Sekincau operations to date. The
tidak berkeyakinan bahwa penyisihan untuk Group therefore does not believe that a provision
jaminan tersebut diperlukan pada tanggal for such guarantees is necessary as of 30 June
30 Juni 2025 dan 31 Desember 2024. 2025 and 31 December 2024.
f. Jaminan akuisisi aset Filipina f. Guarantees of Philippines asset acquisition
Pada tanggal 22 Desember 2016, ACEHI-Star On 22 December 2016, ACEHI-Star Holdings, Inc.
Holdings, Inc. (“ACEHI-Star”) menandatangani (“ACEHI-Star”) signed a Share Sale and Purchase
Perjanjian Jual Beli Saham dengan Union Oil Agreement with Union Oil Company of California,
Company of California, Unocal International Unocal International Corporation and Chevron
Corporation dan Chevron Foreign Investments, Foreign Investments, Inc. to acquire 100% of
Inc. untuk mengakuisisi 100% saham CVX di CVX’s shares in Chevron Kalinga, Ltd., Chevron
Chevron Kalinga, Ltd., Chevron Geothermal Geothermal Philippines Holdings, LLC, and
Philippines Holdings, LLC, dan Chevron Chevron Geothermal Services Company (“the
Geothermal Services Company (“Filipina SPA”) di Philippines SPA”) pursuant to which a guarantee in
mana jaminan sehubungan dengan kewajiban respect of ACEHI-Star's obligations was given to
ACEHI-Star diberikan kepada penjual CVX oleh the CVX sellers by the Buyer Direct Shareholder
Pembeli Penjamin Pemegang Saham Langsung Guarantors and the Buyer Group Guarantors. The
dan Penjamin Kelompok Pembeli. Penjamin Buyer Direct Shareholder Guarantors are SEGHPL
Pemegang Saham Pembeli Langsung adalah and Star Energy Geothermal Philippines B.V. The
SEGHPL dan Star Energy Geothermal Philippines Buyer Group Guarantors are SEGHPL and AC
B.V. Penjamin Grup Pembeli adalah SEGHPL dan Energy Holdings, Inc. The Buyer Direct
AC Energy Holdings, Inc. Penjamin Pemegang Shareholder Guarantors and the Buyer Group
Saham Pembeli Langsung dan Penjamin Grup Guarantors are collectively referred as Buyer
Pembeli secara bersama-sama disebut sebagai Guarantors. In July 2017, AC Energy Holdings, Inc.
Penjamin Pembeli. Pada bulan Juli 2017, AC and SEGHPL entered into definitive agreements
Energy Holdings, Inc. dan SEGHPL for the transfer of their consortium interests in
menandatangani perjanjian definitif untuk ACEHI-Star to AllFirst Equity Holdings, Inc.
pengalihan kepentingan konsorsium mereka di (“AllFirst”). Therefore, it does not release SEGHPL
ACEHI-Star kepada AllFirst Equity Holdings, Inc. as a Buyer Group Guarantor until 31 December
("AllFirst"). Oleh karena itu, tidak melepaskan 2048.
SEGHPL sebagai Penjamin Kelompok Pembeli
sampai dengan tanggal 31 Desember 2048.
Dengan demikian, AllFirst memberikan jaminan As such, AllFirst gave a back to back guarantee to
back-to-back kepada SEGHPL (yaitu Stand-By SEGHPL (i.e; Stand-By Letter of Credit), issued by
Letter of Credit), yang diterbitkan oleh BPI, untuk Bank of the Philippine Islands, to secure the
menjamin kewajiban AllFirst untuk mengganti obligation of AllFirst to indemnify and keep
kerugian dan menjaga SEGHPL bebas dan tidak SEGHPL free and harmless from any claim that
berbahaya dari segala tuntutan yang mungkin may be made by the sellers and/or seller
dibuat oleh penjual dan/atau penjual penjamin guarantors against SEGHPL in its capacity as a
terhadap SEGHPL dalam kedudukannya sebagai buyer guarantor, amounting to US$2,592,000 – full
pembeli penjamin sebesar AS$2.592.000 – nilai amount for 18% of its Buyer Group Equity
penuh untuk 18% dari Buyer Group Equity Proportion.
Proportion.
150
Page 153
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Terdapat diskusi yang sedang berlangsung There are discussions ongoing in relation to the
sehubungan dengan novasi semua kewajiban novation of all obligations under the guarantees
berdasarkan jaminan yang diberikan oleh given by the Buyer Guarantors in the Philippines
Penjamin Pembeli di SPA Filipina kepada AllFirst, SPA to AllFirst, but formal documentation in
tetapi dokumentasi formal sehubungan dengan respect of such novation has not been executed to
novasi tersebut belum dilaksanakan hingga saat date.
ini.
g. PSPE Suoh Sekincau Selatan di Sumatra dan g. PSPE of South Suoh Sekincau in Sumatra and
Hamiding di Maluku Hamiding in Maluku
Pada tanggal 21 Juni 2018, Kementerian ESDM On 21 June 2018, the MoEMR granted PSPEs of
memberikan PSPE Suoh Sekincau Selatan dan South Suoh Sekincau and Hamiding. In relation to
Hamiding. Sehubungan dengan PSPE, SEGSS the PSPEs, SEGSS and SEGI are required to drill
dan SEGI diwajibkan untuk mengebor sekurang- at least 1 (one) exploration well for each PSPE
kurangnya 1 (satu) sumur eksplorasi untuk setiap within the period (i.e 3 years) in South Suoh
PSPE dalam periode (yaitu tiga tahun) di Suoh Sekincau and Hamiding.
Sekincau Selatan dan Hamiding.
Pada tanggal 3 Juni 2025, Kementerian ESDM On 3 June 2025, the MoEMR approved to extend
menyetujui untuk memperpanjang periode PSPE the PSPE period of South Suoh Sekincau until 20
Suoh Sekincau Selatan hingga 20 Juni 2026 June 2026 since the permit of boundary
karena izin perubahan tata batas belum modification is not issued yet by the Ministry of
dikeluarkan oleh Kementerian Lingkungan Hidup Environment and Forestry. Therefore, MoEMR
dan Kehutanan. Oleh karena itu, Kementerian agreed to postpone the Company’s responsibility
ESDM setuju untuk menunda kewajiban to implement PSPE’s activities in South Suoh
Perusahaan untuk melaksanakan kegiatan PSPE Sekincau.
di Suoh Sekincau Selatan.
Kementerian ESDM lewat beberapa surat yang MoEMR, through several letters issued, has
diterbitkan telah menyetujui penghentian approved the temporary suspension and
sementara dan penundaan kewajiban Grup untuk postponement of the Group’s obligations to carry
melaksanakan kegiatan PSPE di Hamiding. Surat out PSPE activities in Hamiding. The latest letter
terakhir dikeluarkan pada tanggal 6 Maret 2025, was issued on 6 March 2025, to approve the
untuk menyetujui menyetujui perpanjangan extension of the temporary suspension of PSPE
penghentian sementara PSPE Hamiding hingga Hamiding until 20 June 2026 due to rejection and
20 Juni 2026 karena penolakan dan permintaan requests for replacement of community plants in
penggantian tanaman masyarakat di area Hutan the Protected Forest area.
Lindung.
h. Akuisisi anak perusahaan h. Acquisitions of subsidiaries
Pada tanggal 15 Desember 2023, BWE On 15 December 2023, BWE entered into
menandatangani perjanjian jual dan beli saham conditional share sale and purchase agreements
bersyarat sebagai berikut: as follows:
i. Agreement for the Sale and Purchase of i. Agreement for the Sale and Purchase of
Shares dalam PT UPC Sidrap Bayu Energi Shares in PT UPC Sidrap Bayu Energi with
dengan UPC Renewables Asia Pacific UPC Renewables Asia Pacific Holdings Pte.
Holdings Pte. Ltd. ("UPCAPH"), ACEN Ltd. ("UPCAPH"), ACEN Renewables
Renewables International Pte. Ltd. ("ACRI"), International Pte. Ltd. ("ACRI"), UPC
UPC Renewables Asia Ill Limited ("Asia Ill"), Renewables Asia Ill Limited ("Asia Ill"), Sidrap
Sidrap (HK) Limited ("Sidrap HK"), dan (HK) Limited ("Sidrap HK"), and Sunedison
Sunedison Sidrap B.V. ("SunEd BV") Sidrap B.V. ("SunEd BV') (UPCAPH, ACRI,
(UPCAPH, ACRI, Asia Ill, Sidrap HK, dan Asia Ill, Sidrap HK, and Sun Ed BV collectively
SunEd BV secara bersama-sama disebut referred to as the"Sellers"), where BWE agreed
sebagai "Para Penjual"), dimana BWE setuju to acquire 515,515 class A shares and 34,368
untuk melakukan pengambilalihan 515.515 class B shares representing approximately
saham kelas A dan 34.368 saham kelas B yang 99.99% of the total issued and paid-up capital
mewakili sekitar 99,99% dari jumlah modal of PT UPC Sidrap Bayu Energi ("SBE") owned
ditempatkan dan disetor PT UPC Sidrap Bayu by the Sellers ("SBE Agreement”).
Energi ("SBE") yang dimiliki oleh Para Penjual
("Perjanjian SBE").
151
Page 154
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
ii. Agreement for the Sale and Purchase of ii. Agreement for the Sale and Purchase of
Shares dalam PT Barito Wind Operation and Shares in PT Barito Wind Operation and
Maintenance Indonesia dengan UPCAPH, Maintenance Indonesia with UPCAPH, where
dimana BWE setuju untuk melakukan BWE agreed to acquire 2,499 shares
pengambilalihan 2.499 saham yang mewakili representing approximately 99.99% of the total
sekitar 99,99% dari jumlah modal ditempatkan issued and paid-up capital of PT Barito Wind
dan disetor PT Barito Wind Operation and Operation and Maintenance Indonesia ("OMI")
Maintenance Indonesia ("OMI") yang dimiliki owned by UPCAPH ("OMI Agreement'').
oleh UPCAPH ("Perjanjian OMI").
iii. Agreement for the Sale and Purchase of iii. Agreement for the Sale and Purchase of
Relevant Sale Shares dan novasi penyertaan Relevant Sale Shares and the novation of
Development Loan dengan UPCAPH dan Development Loan Participations with UPCAPH
ACEN Investments HK Limited (“ACEN HK”), and ACEN Investments HK Limited (“ACEN
dimana BWE setuju untuk: HK”), where BWE agreed to:
melakukan pengambilalihan atas: Acquire:
- 19.364 saham yang mewakili sekitar - 19,364 shares representing
51% dari jumlah modal ditempatkan approximately 51% of the total issued and
dan disetor PT Sukabumi Bayu Energi paid-up capital of PT Sukabumi Bayu
("Sukabumi") yang dimiliki oleh UPC Energi ("Sukabumi") owned by UPC
Renewables Asia IV Limited dan UPC Renewables Asia IV Limited and UPC
Sukabumi (HK) Ltd.; dan Sukabumi (HK) Ltd; and
- 10.200 saham yang mewakili sekitar - 10,200 shares representing
51% dari jumlah modal ditempatkan approximately 51% of the total issued and
dan disetor PT Lombok Timur Bayu paid-up capital of PT Lombok Timur Bayu
Energi ("Lombok") yang dimiliki oleh Energi ("Lombok'') owned by UPC
UPC Renewables Asia VIII Limited Renewables Asia VIII Limited and UPC
dan UPC Lombok (HK) Ltd. Lombok (HK) Ltd.
menerima novasi sebagian piutang received a novation of a portion of the
sehubungan dengan penyertaan receivables in relation to the development
development loan Sukabumi dan Lombok loan participation of Sukabumi and Lombok
dari UPCRI dan UPCRL. from UPCRI and UPCRL.
Lebih lanjut, pada tanggal 15 Desember 2023, In relation to the above, on 15 December 2023 BWE
BWE telah melakukan penyelesaian completed the acquisition of 10,200 shares
pengambilalihan 10.200 saham yang mewakili representing approximately 51% of the total paid-up
sekitar 51% dari jumlah modal disetor dan modal capital and issued capital of SIDRAP 2 from
ditempatkan SIDRAP 2 dari UPCRAV dan UPCSE UPCRAV and UPCSE as the sellers for a purchase
selaku para penjual dengan harga pembelian price of US$1,346 and the novation of a portion of the
sebesar AS$1.346 serta penerimaan novasi receivables in relation to the development loan
sebagian piutang atas development loan participation for SIDRAP 2 in the amount of US$19
participation untuk SIDRAP 2 sejumlah AS$19 dari from UPCRI and US$3,805 from UPCRL (Note 6a).
UPCRI dan AS$3.805 dari UPCRL (Catatan 6a).
BWE telah melakukan penyelesaian BWE has completed the acquisition of Sukabumi and
pengambilalihan atas Sukabumi dan Lombok pada Lombok on 3 January 2024 (Note 6).
tanggal 3 Januari 2024 (Catatan 6).
Pada tanggal 2 April 2024 BWE telah melakukan On 2 April 2024, BWE has completed the acquisition
penyelesaian pengambilalihan atas: of:
i. 515.515 saham kelas A dan 34.368 saham i. 515,515 of class A shares and 34,368 of class
kelas B yang mewakili sekitar 99,99% dari B shares representing approximately 99,99%
jumlah modal disetor dan modal ditempatkan of the total paid-up capital and issued capital
PT UPC Sidrap Bayu Energi ("SBE") dari of PT UPC Sidrap Bayu Energi (“SBE”) from
UPC Renewables Asia Pacific Holdings Pte. UPC Renewables Asia Pacific Holdings Pte.
Ltd. (“UPCAPH”), ACEN Renewables Ltd. (“UPCAPH”), ACEN Renewables
International Pte. Ltd. (“ACRI”), UPC International Pte. Ltd. (“ACRI”), UPC
Renewables Asia III Limited (“Asia III”), Renewables Asia III Limited (“Asia III”), Sidrap
Sidrap (HK) Limited (“Sidrap HK”), dan (HK) Limited (“Sidrap HK”), dan Sunedison
Sunedison Sidrap B.V. (“SunEd BV”) Sidrap B.V. (“SunEd BV”) (UPCAPH, ACRI,
(UPCAPH, ACRI, Asia III, Sidrap HK, dan Asia III, Sidrap HK, dan SunEd BV collectively
SunEd BV secara bersama-sama disebut referred to as “Sellers”) with a consideration
sebagai “Para Penjual”) dengan imbalan paid of US$117,877.
yang dibayarkan sebesar AS$117.877.
152
Page 155
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
ii. 2.499 saham yang mewakili sekitar 99,96% ii. 2,499 of shares representing approximately
dari jumlah modal disetor dan modal 99.96% of the total paid-up capital and issued
ditempatkan PT Barito Wind Operation and capital of PT Barito Wind Operation and
Maintenance Indonesia (“OMI”) dari Maintenance Indonesia (“OMI”) from
UPCAPH dengan harga pembelian sebesar UPCAPH with a purchase price of US$292.
AS$292.
i. Pemeriksaan Pajak SBE i. Tax Audit SBE
Pada tanggal 9 Agustus 2016, Kementerian On 9 August 2016, the Ministry of Finance (“MoF”)
Keuangan (“Kemenkeu”) menerbitkan Keputusan issued MoF Decree number 141/KM.3/2016, in
Menteri Keuangan nomor 141/KM.3/2016, dimana which the MoF has granted income tax facilities for
Kemenkeu memberikan fasilitas pajak SBE as follows:
penghasilan untuk SBE sebagai berikut:
1. Pengurangan penghasilan neto sampai 1. Reduction in net income up to 30% of the
dengan 30% dari jumlah yang diinvestasikan, amount invested, prorated at 5% for six years
diprorata sebesar 5% selama enam tahun dari of the commercial production, provided that
produksi komersial, dengan syarat aset yang the assets invested are not transferred out
diinvestasikan tidak dialihkan dalam jangka within six years;
waktu enam tahun;
2. Penyusutan yang dipercepat dan/atau 2. accelerated depreciation and/or amortisation
pengurangan amortisasi; deductions;
3. Perpanjangan rugi fiskal yang dapat 3. extension of tax losses carried forward for up
dikompensasi hingga sepuluh tahun; dan to ten years; and
4. Pengurangan tarif pemotongan pajak atas 4. a reduction of the withholding tax rate on
dividen yang dibayarkan kepada non-residen dividends paid to non-residents to 10% (or
menjadi 10% (atau lebih rendah jika ada lower if treaty relief is available).
keringanan dalam perjanjian).
Fasilitas pajak tersebut berlaku efektif sejak The tax facilities are effective from the date the
tanggal diterbitkannya Keputusan Menteri MoF Decree was issued, except for the reduction
Keuangan, kecuali untuk pengurangan in net income and the extension of tax losses
penghasilan neto dan perpanjangan rugi fiskal carried forward which are subject to Decision of
yang dapat dikompensasi yang tunduk pada the Directorate General of Taxes (“DGT”).
Keputusan Direktorat Jenderal Pajak (“DJP”).
Pada tanggal 25 Januari 2019, DJP menerbitkan On 25 January 2019, the DGT issued Decision
Surat Keputusan nomor KEP-32/PJ/2019 yang Letter number KEP-32/PJ/2019 confirming its
menegaskan persetujuan atas fasilitas approval for reduction in net income facility
pengurangan penghasilan neto yang berlaku effective from fiscal year 2018 amounting to
efektif mulai tahun fiskal 2018 sebesar Rp323,9 Rp323.9 billion (equivalent to US$19,954).
miliar (setara dengan AS$19.954).
Pada tanggal 26 April 2022, Kemenkeu mencabut On 26 April 2022, the MoF revoked the SBE's tax
fasilitas pajak SBE berdasarkan surat nomor facility based on letter number 154/KM.3/2022. On
154/KM.3/2022. Pada tanggal 29 September 29 September 2022, SBE filed a lawsuit to the Tax
2022, SBE mengajukan gugatan ke Pengadilan Court against MoF and DGT for this decision. On
Pajak terhadap Kemenkeu dan DJP atas 6 December 2024, the Tax Court accepted SBE
keputusan ini. Pada tanggal 6 Desember 2024, lawsuit. Subsequently, SBE received a notification
Pengadilan Pajak mengabulkan gugatan SBE. letter dated 13 March 2025 informing that DGT had
Selanjutnya, SBE menerima surat pemberitahuan submitted the memory for judicial review to the
tertanggal 13 Maret 2025 yang menginformasikan Supreme Court dated 6 March 2025. As of the
bahwa DJP telah menyampaikan memori completion date of these consolidated financial
peninjauan kembali kepada Mahkamah Agung statements, there has been no further action
tertanggal 6 Maret 2025. Sampai dengan tanggal regarding this matter.
penyelesaian laporan keuangan konsolidasian ini,
belum terdapat tindak lanjut mengenai hal
tersebut.
153
Page 156
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Pada tanggal 5 Oktober 2023, SBE menerima On 5 October 2023, SBE received Notice of
Surat Ketetapan Pajak Kurang Bayar Tambahan Additional Tax Underpayment Assessment
(“SKPKBT”) untuk tahun fiskal 2020 sebesar Rp (“SKPKBT”) for fiscal year 2020 amounting to
21,1 miliar (setara dengan AS$1.305). Pada Rp 21.1 billion (equivalent to US$1,305). On 21
tanggal 21 Desember 2023, SBE telah melakukan December 2023, SBE fully paid for the
pembayaran penuh atas kurang bayar untuk tahun underpayment for fiscal year 2020. On December
fiskal 2020. Pada tanggal 27 Desember 2023, SBE 27, 2023, SBE has submitted tax objection letters
telah mengajukan surat keberatan atas SKPKBT for SKPKBT fiscal year 2020 and rejected by Tax
tahun pajak 2020 dan ditolak oleh Kantor Pajak Office on 13 September 2024. On 12 December
pada tanggal 13 September 2024. Pada tanggal 2024, SBE filed an appeal to the Tax Court.
12 Desember 2024, SBE mengajukan banding ke
Pengadilan Pajak.
Pada tanggal 14 November 2023, SBE menerima On 14 November 2023, SBE received SKPKBT for
SKPKBT untuk tahun fiskal 2019 sebesar Rp80,7 fiscal year 2019 amounting to Rp80.7 billion
miliar (setara dengan AS$4.977). SBE belum (equivalent to US$4,977). SBE has not paid the
melakukan pembayaran atas kurang bayar untuk underpayment for fiscal year 2019. On 12 February
tahun fiskal 2019. Pada tanggal 12 Februari 2024, 2024, SBE has submitted tax objection letters for
SBE telah mengajukan surat keberatan atas SKPKBT fiscal year 2019 and rejected by Tax
SKPKBT tahun fiskal 2019 dan ditolak oleh Kantor Office on 4 November 2024. On 31 January 2025,
Pajak pada tanggal 4 November 2024. Pada SBE filed an appeal to the Tax Court.
tanggal 31 Januari 2025, SBE mengajukan
banding ke Pengadilan Pajak.
Pada tanggal 21 November 2023, SBE menerima On 21 November 2023, SBE received SKPN for
SKPN untuk tahun fiskal 2018. Akan tetapi fiscal year 2018. However, the fiscal loss for year
kerugian fiskal tahun 2018 menjadi lebih kecil 2018 was reduced following the revocation of
sebagai akibat dicabutnya fasilitas pajak SBE. SBE’s tax facility. On 12 February 2024, SBE has
Pada tanggal 12 Februari 2024, SBEtelah submitted tax objection letters for SKPKBT fiscal
mengajukan surat keberatan atas SKPN tahun year 2018 and rejected by Tax Office on 4
fiskal 2018 dan ditolak oleh Kantor Pajak pada November 2024. On 31 January 2025, SBE filed an
tanggal 4 November 2024. Pada tanggal appeal to the Tax Court.
31 Januari 2025, SBE mengajukan banding ke
Pengadilan Pajak.
Sampai dengan tanggal penyelesaian laporan As of the completion date of these consolidated
keuangan konsolidasian ini, SBE belum menerima financial statements, SBE has not received a
keputusan atas banding untuk tahun pajak 2018, decision regarding the appeal for fiscal year 2018,
2019 dan 2020. Namun demikian, manajemen 2019 and 2020. However, management is of the
berpendapat bahwa SBE memiliki dasar yang kuat view that SBE has a strong basis to defend its
untuk mempertahankan posisinya. position.
32. ASET DAN LIABILITAS KEUANGAN 32. FINANCIAL ASSETS AND LIABILITIES
Pada tanggal 30 Juni 2025, Grup mengklasifikasikan As at 30 June 2025, the Group classified its cash and
kas dan setara kas yang dibatasi penggunaannya, cash equivalents, restricted cash, trade and other
piutang usaha dan lain-lain (kecuali piutang PPN dan receivables (excluding VAT receivables and
pembayaran di muka terkait dengan klaim audit prepayment of government audit claims), finance lease
pemerintah), piutang sewa pembiayaan dan deposito receivables and time deposits, amounting to
berjangka, sebesar AS$1.000.378 (31 Desember US$1,000,378 (31 December 2024: US$994,967) as
2024: AS$994.967) sebagai aset keuangan yang financial assets at amortised cost.
diukur pada biaya perolehan diamortisasi.
Pada tanggal 30 Juni 2025, Grup mengklasifikasikan As at 30 June 2025, the Group classified its trade and
utang usaha dan lain-lain, beban yang masih harus other payables, accrued expenses and borrowings as
dibayar dan pinjaman sebagai liabilitas keuangan yang financial liabilities at amortised cost amounting to
diukur pada biaya perolehan diamortisasi sebesar US$2,123,443 (31 December 2024: US$2,212,993).
AS$2.123.443 (31 Desember 2024: AS$2.212.993).
154
Page 157
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
33. NILAI WAJAR ASET DAN LIABILITAS 33. FAIR VALUE OF ASSETS AND LIABILITIES
a. Hirarki nilai wajar a. Fair value hierarchy
Grup mengkategorikan pengukuran nilai wajar The Group categorises fair value measurements
menggunakan hirarki nilai wajar yang bergantung using a fair value hierarchy that is dependent on the
pada input penilaian yang digunakan sebagai valuation inputs used as follows:
berikut:
Tingkat 1 - Harga kuotasian (belum disesuaikan) Level 1 - Quoted prices (unadjusted) in active
di pasar aktif untuk aset atau liabilitas identik markets for identical assets or liabilities that the
yang dapat diakses Grup pada tanggal Group can access at the measurement date;
pengukuran;
Tingkat 2 - Input selain harga kuotasian yang Level 2 - Inputs other than quoted prices
termasuk dalam Tingkat 1 yang dapat included within Level 1 that are observable for
diobservasi untuk aset atau liabilitas, baik secara the asset or liability, either directly (i.e. as
langsung (yaitu sebagai harga) atau tidak prices) or indirectly (i.e. derived from prices);
langsung (yaitu berasal dari harga); dan and
Tingkat 3 - Teknik penilaian dimana input level Level 3 - Valuation techniques for which the
terendah yang signifikan terhadap pengukuran lowest level input that is significant to the fair
nilai wajar secara langsung atau tidak langsung value measurement is directly or indirectly
tidak dapat diobservasi. unobservable.
Pengukuran nilai wajar yang menggunakan input Fair value measurements that use inputs of different
dari tingkat hirarki yang berbeda dikategorikan hierarchy levels are categorised in their entirety in
secara keseluruhan dalam tingkat hierarki nilai the same level of the fair value hierarchy as the
wajar yang sama sebagai input dengan level lowest level input that is significant to the entire
terendah yang signifikan untuk keseluruhan measurement.
pengukuran.
b. Aset dan liabilitas tidak dicatat pada nilai b. Assets and liabilities not carried at fair value but
wajarnya tetapi nilai wajarnya diungkapkan for which fair value is disclosed
Tabel berikut menunjukkan analisis aset dan The following table shows an analysis of the
liabilitas Grup yang tidak diukur pada nilai wajar Group’s assets and liabilities not measured at fair
tetapi diungkapkan nilai wajarnya: value but for which fair value is disclosed:
30 Juni/June 2025
Jumlah
Tercatat/
Tingkat/ Tingkat/ Tingkat/ Jumlah Carrying
Level 1 Level 2 Level 3 Total amount
Aset: Assets:
Piutang sewa pembiayaan - - 475,415 475,415 401,917 Finance lease receivables
Liabilitas: Liabilities:
Pinjaman 1,333,611 - 559,235 1,892,846 2,033,310 Borrowings
Liabilitas sewa - - 6,264 6,264 6,264 Lease liabilities
31 Desember/December 2024
Jumlah
Tercatat/
Tingkat/ Tingkat/ Tingkat/ Jumlah Carrying
Level 1 Level 2 Level 3 Total amount
Aset: Assets:
Piutang sewa pembiayaan - - 439,575 439,575 363,449 Finance lease receivables
Liabilitas: Liabilities:
Pinjaman 1,372,892 - 577,669 1,950,561 2,010,175 Borrowings
Liabilitas sewa - - 6,968 6,968 6,968 Lease liabilities
Penentuan nilai wajar Determination of fair value
Nilai wajar yang diungkapkan dalam tabel di atas The fair values disclosed in the table above are
diestimasi dengan mendiskontokan arus kas masa estimated by discounting expected future cash
depan yang diharapkan pada suku bunga pinjaman flows at market incremental lending rates for similar
tambahan pasar untuk jenis pinjaman serupa pada types of lending at the end of the reporting period.
akhir periode pelaporan.
155
Page 158
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
c. Aset dan liabilitas yang jumlah tercatatnya c. Assets and liabilities whose carrying amounts
mendekati nilai wajar approximate the fair value
Manajemen menilai bahwa nilai wajar kas dan kas The management assessed that the fair values of
di bank, deposito, kas dan deposito berjangka yang cash on hand and in banks, deposits, restricted
dibatasi penggunaannya, piutang usaha dan cash and time deposits, trade and other
piutang lain-lain, utang usaha dan utang lain-lain, receivables, trade and other payables, and accrued
dan biaya akrual mendekati nilai tercatatnya expenses approximate their carrying amounts
sebagian besar karena jatuh tempo jangka pendek largely due to the short-term maturities of these
dari instrumen tersebut. instruments.
34. MANAJEMEN RISIKO KEUANGAN 34. FINANCIAL RISK MANAGEMENT
Berbagai aktivitas yang dilakukan membuat Grup The Group’s activities are exposed to a variety of
terekspos terhadap berbagai risiko keuangan: risiko financial risks: market risk (including the effects of
pasar (termasuk dampak risiko nilai tukar mata uang foreign currency exchange rate risk, commodity price
asing, risiko tingkat harga komoditas, dan risiko tingkat risk and interest rate risk), and credit risk and liquidity
suku bunga), risiko kredit dan risiko likuiditas. Tujuan risk. The objectives of the Group’s risk management
dari proses manajemen risiko Grup adalah untuk processes are to identify, measure, monitor and
mengidentifikasi, mengukur, mengawasi dan manage key risks in order to safeguard the Group’s
mengelola risiko dasar dalam upaya melindungi long-term business continuity and to minimise potential
kesinambungan bisnis dalam jangka panjang dan adverse effects on the financial performance of the
meminimalkan dampak yang tidak diharapkan pada Group.
kinerja keuangan Grup.
Grup menggunakan berbagai metode untuk mengukur The Group uses various methods to measure risk to
risiko yang dihadapinya. Metode ini meliputi analisis which it is exposed. These methods include sensitivity
sensitivitas untuk risiko tingkat suku bunga, nilai tukar analysis in the case of interest rates, foreign exchange
dan risiko harga lainnya dan analisis umur piutang and other price risks and aging analysis for credit risk.
untuk risiko kredit.
Faktor risiko keuangan Financial risk factors
a. Risiko pasar a. Market risk
(i) Risiko nilai tukar mata uang asing (i) Foreign exchange risk
Risiko nilai tukar mata uang asing terutama Foreign exchange risk primarily arises from
timbul dari aset dan liabilitas moneter yang recognised monetary assets and liabilities
diakui dalam mata uang yang bukan mata that are denominated in a currency that is not
uang fungsional entitas. Eksposur ini dikelola the entity’s functional currency. This exposure
sebagian dengan menggunakan lindung nilai is managed partly by using natural hedges
alami yang timbul dari aset dan kewajiban that arise from monetary assets and liabilities
moneter dalam mata uang asing yang sama. in the same foreign currency. Management
Manajemen juga mengelola risiko nilai tukar also manages its foreign currency exchange
mata uang asing melalui pemantauan fluktuasi risk through monitoring the fluctuation of
mata uang asing secara terus-menerus dan foreign currency continuously and maintaining
menjaga kecukupan kas dalam mata uang sufficient cash in foreign currency to cover its
asing untuk menutup kewajiban yang jatuh maturing obligations denominated in foreign
tempo dalam mata uang asing. currency.
Pada tanggal 30 Juni 2025, jika Rupiah As at 30 June 2025, if the Indonesian Rupiah
menguat/melemah sebesar 10% terhadap strengthened/weakened by 10% against the
AS$, dengan asumsi semua variabel lainnya US$, with all other variables held constant,
konstan, laba sebelum pajak akan lebih profit before tax would have been lower/higher
rendah/tinggi masing-masing sebesar by US$9,845 (31 December 2024:
AS$9.845 (31 Desember 2024: AS$1.620), US$1,620), respectively, mainly as a result of
terutama sebagai akibat dari foreign exchange gains/losses on the
keuntungan/kerugian selisih kurs penjabaran translation of cash and cash equivalents,
kas dan setara kas, piutang usaha, piutang trade receivables, other receivables, trade
lain-lain, utang usaha, utang lain-lain, liabilitas payables, other payables, post-employment
imbalan pasca kerja, dan biaya yang masih benefits liabilities, and accrued expenses.
harus dibayar.
156
Page 159
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
(ii) Risiko harga komoditas (ii) Commodity price risk
Tidak ada masalah risiko harga komoditas There is no commodity price risk issue for the
untuk bisnis panas bumi karena harga telah geothermal business as the price has been
disepakati dalam ESC berdasarkan formula agreed in the ESC based on the agreed
yang disepakati dan ditetapkan untuk jangka formula and fixed for a long-term, only
panjang hanya disesuaikan dengan inflasi adjusted by inflation (Note 1.c).
(Catatan 1.c).
(iii) Risiko suku bunga (iii) Interest rate risk
Risiko suku bunga Grup terutama timbul dari The Group’s interest rate risk arises from long-
pinjaman jangka panjang dalam mata uang term borrowings denominated in US Dollars.
Dolar AS. Risiko suku bunga dari kas di bank The interest rate risk on cash in banks is not
tidak signifikan dan semua instrumen significant and all other financial instruments
keuangan lainnya tidak dikenakan bunga. Di are not interest bearing. Within borrowings,
dalam pinjaman, utang bank yang diterbitkan bank loans issued at variable rates expose the
dengan tingkat bunga variabel mengekspos Group to cash flow interest rate risk.
Grup terhadap risiko suku bunga arus kas.
Grup menganalisis eksposur dari risiko bunga The Group analyses its interest rate exposure
secara dinamis. Beberapa skenario on a dynamic basis. Various scenarios are
disimulasikan dengan beberapa simulated taking into consideration the
pertimbangan seperti pembiayaan kembali, refinancing of existing positions, and
memperbaharui dari kondisi yang ada dan alternative financing. Based on the above
alternatif lain pembiayaan. Berdasarkan scenarios, the Group manages its cash flow
scenario tersebut di atas, Grup mengelola interest rate risk by refinancing borrowings at
risiko arus kas dari suku bunga dengan a lower interest rate.
melakukan pembiayaan pinjaman dengan
suku bunga yang lebih rendah.
Pada tanggal 30 Juni 2025, jika tingkat suku As at 30 June 2025, if interest rates on bank
bunga atas utang bank 10 basis poin lebih loans had been 10 basis points higher/lower
tinggi/lebih rendah, dengan asumsi semua with all other variables held constant, the profit
variabel lain konstan, laba sebelum pajak before tax would have been US$292 (31
akan menjadi lebih rendah/tinggi sebesar December 2024: US$607) lower/higher.
AS$292 (31 Desember 2024: AS$607).
b. Risiko kredit b. Credit risk
Risiko kredit adalah risiko kerugian yang mungkin Credit risk is the risk of loss that may arise on
timbul atas instrumen keuangan yang beredar jika outstanding financial instruments should a
pihak lawan gagal memenuhi kewajibannya. counterparty default on its obligations. The
Eksposur risiko kredit Grup terutama timbul dari Group’s exposure to credit risk arises primarily
piutang usaha dan piutang lain-lain. Untuk aset from trade and other receivables. For other
keuangan lainnya (termasuk kas di bank, deposito, financial assets (including cash in bank, deposits,
kas dan deposito berjangka yang dibatasi restricted cash and time deposit, finance lease
penggunaannya, piutang sewa pembiayaan, dan receivables, and trade and other receivables
piutang usaha dan piutang lainnya kecuali untuk except for VAT receivables), the Group and the
piutang PPN), Grup dan Perusahaan Company minimise credit risk by dealing
meminimalkan risiko kredit dengan berurusan exclusively with high credit rating counterparties
secara eksklusif dengan rekanan dengan (including state-owned enterprises). In addition,
peringkat kredit tinggi (termasuk BUMN). Selain based on the Group’s past history, all outstanding
itu, berdasarkan sejarah masa lalu Grup, semua receivables from PGE and PLN, two Indonesian
piutang dari PGE dan PLN, dua badan usaha milik state-owned enterprises will be settled based on
negara Indonesia akan diselesaikan berdasarkan the agreed terms of payment. Therefore, the
syarat pembayaran yang disepakati. Oleh karena Group has a low risk appetite and manages credit
itu, Grup memiliki selera risiko yang rendah dan risk to a low level.
mengelola risiko kredit pada tingkat yang rendah.
157
Page 160
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Eksposur risiko kredit Exposure to credit risk
Pada akhir periode pelaporan, eksposur At the end of the reporting period, the Group’s
maksimum Grup terhadap risiko kredit diwakili oleh maximum exposure to credit risk is represented by
nilai tercatat setiap kelas aset keuangan yang the carrying amount of each class of financial
diakui di neraca, termasuk derivatif dengan nilai assets recognised in the balance sheet, including
wajar positif. derivatives with positive fair values.
Profil konsentrasi risiko kredit Credit risk concentration profile
Risiko kredit adalah risiko bahwa salah satu pihak Credit risk is the risk that one party to a financial
atas instrumen keuangan akan gagal memenuhi instrument will fail to discharge its obligation
kewajibannya yang mengakibatkan kerugian resulting in a financial loss to the other party. The
keuangan bagi pihak lain. Departemen keuangan Group’s corporate finance department regularly
korporat Grup secara rutin memantau kondisi monitors the financial condition of banks and
keuangan bank dan lembaga keuangan tempat financial institutions where cash is deposited. As
kas disimpan. Per 30 Juni 2025, Grup tunduk pada of 30 June 2025, the Group is subject to
konsentrasi risiko kredit karena 67% simpanan concentration of credit risk as 67% of its bank
banknya ditempatkan di satu bank, dengan deposits are placed in one bank, with a credit
peringkat kredit Aa1, berdasarkan Moody's. rating Aa1, based on Moody’s. With respect to
Sehubungan dengan risiko kredit yang timbul dari credit risk arising from trade receivables, the
piutang usaha, Grup tunduk pada konsentrasi Group is subject to concentration of credit risk as
risiko kredit karena seluruh penjualan listrik dan its entire electricity and steam sales are solely
uap hanya melalui PGE dan PLN, dua badan through PGE and PLN, two Indonesian state-
usaha milik negara Indonesia yang tidak memiliki owned enterprises with no history of default. The
riwayat gagal bayar. Grup tidak memiliki jaminan Group does not hold any collateral to secure PLN
apapun untuk menjamin pembayaran PLN kepada payments to the Group under the ESC. As at the
Grup berdasarkan ESC. Pada tanggal pelaporan, reporting date, the carrying amounts of financial
nilai tercatat aset keuangan mencerminkan assets represent the Group’s maximum exposure
eksposur maksimum Grup terhadap risiko kredit. to credit risk.
Aset keuangan yang belum lewat jatuh tempo atau Financial assets that are neither past due nor
mengalami penurunan nilai impaired
Piutang usaha dan piutang lain-lain yang belum Trade and other receivables that are neither past
jatuh tempo atau mengalami penurunan nilai due nor impaired are with creditworthy debtors
adalah milik debitur yang layak kredit dengan with a good payment record with the Group. Cash
catatan pembayaran yang baik dengan Grup. Kas in banks and short-term deposits that are neither
di bank dan deposito jangka pendek yang belum past due nor impaired are placed with or entered
jatuh tempo atau mengalami penurunan nilai into with reputable financial institutions with no
ditempatkan pada atau diadakan pada lembaga history of default.
keuangan terkemuka yang tidak memiliki riwayat
gagal bayar.
Aset keuangan yang lewat jatuh tempo atau Financial assets that are either past due or
mengalami penurunan nilai impaired
Informasi mengenai aset keuangan yang telah Information regarding financial assets that are
jatuh tempo atau mengalami penurunan nilai either past due or impaired is disclosed in Note 10
diungkapkan pada Catatan 10 atas laporan to the consolidated financial statements.
keuangan konsolidasian.
Kerugian kredit ekspektasian (“ECL”) Expected credit losses (“ECL”)
Pada setiap akhir periode pelaporan, Grup At the end of each reporting period, the Group is
diharuskan untuk menilai penyisihan ECL untuk required to assess an allowance for ECL for all
semua piutang. Grup telah mencatat pembalikan receivables. The Group has recorded a reversal of
penyisihan kerugian kredit sebesar AS$29 untuk credit loss allowance amounting to US$29 for the
tahun yang berakhir pada tanggal 30 Juni 2025 (31 year ended 30 June 2025 (31 December 2024:
Desember 2024: pembalikan penyisihan kerugian reversal of credit loss allowance amounting to
kredit sebesar AS$53). Tidak ada pergerakan lain US$53). There are no other movements within the
dalam penyisihan kerugian kredit. credit loss allowance.
158
Page 161
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
c. Risiko likuiditas c. Liquidity risk
Risiko likuiditas adalah risiko dimana Grup akan Liquidity risk is the risk that the Group will
menghadapi kesulitan dalam memenuhi kewajiban encounter difficulty in meeting its financial
keuangannya karena kekurangan dana. Eksposur obligations due to a shortage of funds. The Group’s
Grup terhadap risiko likuiditas terutama timbul dari exposure to liquidity risk arises primarily from
ketidaksesuaian jatuh tempo aset dan liabilitas mismatches of the maturities of financial assets
keuangan. Manajemen risiko likuiditas yang hati- and liabilities. Prudent liquidity risk management
hati menyiratkan menjaga kecukupan kas dan implies maintaining sufficient cash and the
ketersediaan pendanaan melalui komitmen availability of funding through an adequate amount
fasilitas kredit dalam jumlah yang memadai. of committed credit facilities. The corporate finance
Departemen keuangan korporat bertujuan untuk department aims to maintain flexibility in funding by
mempertahankan fleksibilitas dalam pendanaan keeping committed credit facilities available. The
dengan menyediakan fasilitas kredit yang Group’s financial assets include cash and cash
berkomitmen. Aset keuangan Grup meliputi kas equivalents, restricted cash and time deposit, trade
dan setara kas, kas dan deposito berjangka yang and other receivables excluding VAT receivables
dibatasi penggunaannya, piutang usaha dan and prepayment of government audit claims. The
piutang lainnya tidak termasuk piutang PPN dan Group manages liquidity risk by maintaining
pembayaran di muka terkait dengan klaim audit adequate reserves and banking facilities, by
pemerintah. Grup mengelola risiko likuiditas continuously monitoring forecast and actual cash
dengan mempertahankan cadangan dan fasilitas flows, and by matching the maturity profiles of
perbankan yang memadai, dengan terus financial assets and liabilities.
memantau prakiraan dan arus kas aktual, dan
dengan menyesuaikan profil jatuh tempo aset dan
liabilitas keuangan.
Analisis instrumen keuangan dengan sisa jatuh Analysis of financial instruments by remaining
tempo kontraktual contractual maturities
Tabel di bawah ini merangkum profil jatuh tempo The table below summarises the maturity profile of
liabilitas keuangan Grup pada akhir periode the Group’s financial liabilities at the end of the
pelaporan berdasarkan kontrak kewajiban reporting period based on contractual
pembayaran tanpa diskonto: undiscounted repayment obligations:
Lebih dari
satu tahun
dan kurang
dari lima
tahun/More
Kurang dari than one Lebih dari
satu tahun/ year and lima tahun/
Less than not later than More than Jumlah/
one year five years five years Total
30 Juni 2025 30 June 2025
Liabilitas keuangan Financial liabilities
Utang usaha dan lain-lain 8,826 328 - 9,154 Trade and other payables
Beban yang masih harus dibayar 80,979 - - 80,979 Accrued expenses
Pinjaman* 267,925 1,184,798 1,271,306 2,724,029 Borrowings*
Liabilitas sewa* 2,438 4,621 - 7,059 Lease liabilities*
Jumlah 360,168 1,189,747 1,271,306 2,821,221 Total
* Termasuk bunga yang diperhitungan di masa depan/including future imputed interest
159
Page 162
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Lebih dari
satu tahun
dan kurang
dari lima
tahun/More
Kurang dari than one Lebih dari
satu tahun/ year and lima tahun/
Less than not later than More than Jumlah/
one year five years five years Total
31 Desember 2024 31 December 2024
Liabilitas keuangan Financial liabilities
Utang usaha dan lain-lain 21,201 7,377 - 28,578 Trade and other payables
Beban yang masih harus dibayar 87,119 - - 87,119 Accrued expenses
Pinjaman* 287,354 1,225,482 1,355,436 2,868,272 Borrowings*
Liabilitas sewa* 2,441 5,747 - 8,188 Lease liabilities*
Jumlah 398,115 1,238,606 1,355,436 2,992,157 Total
* Termasuk bunga yang diperhitungan di masa depan/including future imputed interest
d. Perubahan liabilitas yang timbul dari aktivitas d. Changes in liabilities arising from financing
pendanaan activities
Penambahan
sehubungan
dengan akuisisi
entitas anak/
Addition related
Awal/ Arus kas/ Amortisasi/ to acquisition Lainnya/ Akhir/
Beginning Cash flows Amortisation of subsidiary Others Ending
30 Juni 2025 30 June 2025
Kas dan deposito berjangka Restricted cash and
yang dibatasi penggunaannya 341,989 (135,699) - - - 206,290 time deposits
Pinjaman: Borrowings:
utang bank 678,930 (5,375) 911 - (1,438) 673,028 bank loans -
senior secured notes 1,418,307 (59,090) 1,065 - - 1,360,282 senior secured notes -
Liabilitas sewa 6,968 (1,021) 300 - 17 6,264 Lease liabilities
31 Desember 2024 31 December 2024
Kas dan deposito berjangka Restricted cash and
yang dibatasi penggunaannya 267,334 74,655 - - - 341,989 time deposits
Pinjaman: Borrowings:
utang bank 486,316 109,699 1,831 86,224 (5,140) 678,930 bank loans -
senior secured notes 1,498,213 (82,167) 2,261 - - 1,418,307 senior secured notes -
Liabilitas sewa 2,740 (2,206) 592 - 5,842 6,968 Lease liabilities
a) Merupakan aktivitas non-kas seperti penambahan biaya pendanaan yang a) Represents non-cash activities such as additions to deferred financing costs
ditangguhkan (disajikan sebagai pengurang saldo pinjaman di laporan posisi (presented as deduction of borrowings balance in the statements of financial
keuangan), penambahan kewajiban sewa, dan pengaruh penjabaran mata position), additions to lease liabilities and the effect of foreign currency
uang asing. translation.
Manajemen risiko permodalan Capital risk management
Tujuan utama pengelolaan modal Grup adalah untuk The primary objective of the Group’s capital
melindungi kemampuan Grup untuk mempertahankan management is to safeguard the Group’s ability to
kelangsungan usahanya dan mempertahankan continue as a going concern and to maintain an optimal
struktur modal yang optimal untuk memaksimalkan capital structure so as to maximise shareholders’ value.
nilai pemegang saham.
Grup mengelola struktur permodalannya dan The Group manages its capital structure and makes
melakukan penyesuaian terhadapnya, sehubungan adjustment to it, in light of changes in economic
dengan perubahan kondisi ekonomi. Untuk conditions. To maintain or adjust the capital structure,
memelihara atau menyesuaikan struktur permodalan, the Group may adjust the dividend payment to
Grup dapat menyesuaikan pembayaran dividen shareholders, return capital to shareholders or issue
kepada pemegang saham, mengembalikan modal new shares. No changes were made in the objectives,
kepada pemegang saham atau menerbitkan saham policies or processes during the years ended
baru. Tidak ada perubahan atas tujuan, kebijakan 30 June 2025 and 31 December 2024.
maupun proses untuk tahun-tahun yang berakhir pada
tanggal 30 Juni 2025 dan 31 Desember 2024.
160
Page 163
PT BARITO RENEWABLES ENERGY TBK PT BARITO RENEWABLES ENERGY TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM 30 JUNI 2025 FINANCIAL STATEMENTS 30 JUNE 2025
(TIDAK DIAUDIT) DAN 31 DESEMBER 2024 (Lanjutan) (UNAUDITED) AND 31 DECEMBER 2024 (Continued)
(Dinyatakan dalam ribuan Dolar Amerika Serikat, (Expressed in thousands of United States Dollars,
kecuali dinyatakan lain) unless otherwise stated)
Grup memantau modal dengan menggunakan gearing The Group monitors capital using a gearing ratio, which
ratio, yaitu utang bersih dibagi total modal ditambah is net debt divided by total capital plus net debt. The
utang bersih. Grup memasukkan utang bersih, Group includes within net debt, borrowings, lease
pinjaman, liabilitas sewa, utang usaha dan lainnya, liabilities, trade and other payables, and accrued
dan biaya akrual dikurangi saldo kas dan bank dan kas expenses less cash and bank balances and restricted
dan deposito berjangka yang dibatasi penggunaannya cash and time deposit excluding discontinued
tidak termasuk operasi yang dihentikan. Modal terdiri operations. Capital comprises total equity in the balance
dari jumlah ekuitas dalam neraca. sheets.
Modal termasuk utang dan ekuitas seperti yang Capital includes debt and equity items as disclosed in
diungkapkan dalam tabel di bawah ini: the table below:
30 Juni/ 31 Desember/
June December
2025 2024
Pinjaman 2,033,310 2,097,237 Borrowings
Liabilitas sewa 6,264 6,968 Lease liabilities
Utang usaha dan lain-lain dan beban Trade and other payables
yang masih harus dibayar 90,133 115,697 and accrued expenses
Kurang: Less:
Kas dan setara kas (265,421) (162,724) Cash and cash equivalents
Kas dan deposito berjangka yang
dibatasi penggunaanya (206,290) (341,989) Restricted cash and time deposit
Utang bersih 1,657,996 1,715,189 Net debt
Jumlah Ekuitas 814,829 732,533 Total equity
Modal dan utang bersih 2,472,825 2,447,722 Capital and net debt
Gearing ratio 67% 70% Gearing ratio
35. TANGGUNG JAWAB MANAJEMEN DAN 35. MANAGEMENT’S RESPONSIBILITY AND APPROVAL
PERSETUJUAN ATAS LAPORAN KEUANGAN OF CONSOLIDATED FINANCIAL STATEMENTS
KONSOLIDASIAN
Penyusunan dan penyajian wajar laporan keuangan The preparation and fair presentation of the
konsolidasian dari halaman 1 sampai 161 merupakan consolidated financial statements on pages 1 to 161
tanggung jawab manajemen, dan telah disetujui oleh were the responsibilities of the management and were
Direktur untuk diterbitkan pada tanggal 31 Juli 2025. approved by the Directors and authorized for issuance
on 31 July 2025.
161
Names mentioned 106 people and organisations named in the text · linked when the evidence is strong
unresolved
org
PT Pertamina Geothermal Energy Beban
p.5
unresolved
org
PT Barito Cahaya Nusantara
p.8 ×2
unresolved
person
Nanny Wiana Setiawan
p.8 ×2
unresolved
org
Menteri
p.8 ×2
unresolved
org
Menteri Hukum dan Hak Asasi
p.8 ×2
unresolved
org
Minister of Law and Human Rights
p.8 ×2
unresolved
org
Indonesia Stock Exchange
p.8 ×2
unresolved
person
Hendra Soetjipto Tan
· Presiden Direktur
p.8 ×3
unresolved
person
Akta Notaris Aulia Taufani
p.9 ×3
unresolved
person
Notary Aulia Taufani
p.9
unresolved
org
Kementerian Hukum dan Hak
p.9
unresolved
org
Ministry of Law and Human Asasi Manusia Republik Indonesia
p.9
unresolved
org
Star Energy Group Holdings Pte. Ltd
p.10
unresolved
org
PT Barito Wind Energy
p.10
unresolved
org
Star Energy Geothermal Pte. Ltd.
p.10 ×7
unresolved
org
PT Star Energy Geothermal Suoh Sekincau
p.10 ×4
unresolved
org
PT Star Energy Geothermal Indonesia
p.10 ×3
unresolved
org
PT Darajat Geothermal Indonesia
p.10 ×5
unresolved
org
PT Star Energy Geothermal Drilling Services
p.10 ×3
unresolved
org
PT Sidrap Bayu Energi Tahap Dua
p.10 ×3
unresolved
org
PT UPC Sidrap Bayu Energi Tahap Dua
p.10 ×3
unresolved
org
PT Sukabumi Bayu Energi
p.10 ×3
unresolved
org
PT UPC Sukabumi Bayu Energi
p.10 ×2
unresolved
org
PT Lombok Timur Bayu Energi
p.10 ×3
unresolved
org
PT UPC Lombok Timur Bayu Energi
p.10 ×3
unresolved
org
PT UPC Sidrap Bayu Energi
p.10 ×5
unresolved
org
PT Barito Wind Operation
p.10 ×3
unresolved
org
PT UPC Operation
p.10 ×3
unresolved
person
Wiwik Condro
p.11 ×3
unresolved
org
Minister of Law
p.11
unresolved
org
Menteri Hukum dan Hak
p.11
unresolved
person
Condro
p.11
unresolved
org
PT Barito
p.11
unresolved
org
PT Barito Mitra
p.11
unresolved
—
IDR’000
p.12
unresolved
org
PT UPC
p.12
unresolved
person
Notary Mala Mukti
p.12
unresolved
org
Kementerian
p.12
unresolved
—
Law and Human Rights of the Republic
p.12
unresolved
org
Star Energy Geothermal Netherlands B.V.
p.13 ×2
unresolved
org
Star Energy Geothermal Philippines B.V.
p.13
unresolved
org
Philippines B.V.
p.13
unresolved
org
Ministry of Energy
p.15
unresolved
org
Kementerian Energi dan Sumber Daya Mineral
p.15
unresolved
org
PT SEGI
p.16 ×8
unresolved
org
PT Pakar Usaha Sejati. Sebelumnya
p.16
unresolved
org
PT Pakar Usaha Sejati. It
p.16
unresolved
org
PT Artha Sarana Karya
p.16 ×2
unresolved
org
PT Sarana Karya Mandiri
p.16 ×2
unresolved
org
PT SKM
p.16 ×6
unresolved
org
PT SKM. Adapun
p.16
unresolved
org
PT SEGI’s
p.16
unresolved
org
PT Star Energy
p.16 ×2
unresolved
org
PT SEGH
p.16 ×19
unresolved
org
PT Bintang
p.16
unresolved
org
PT Bintang Andalan Prasadana
p.16
unresolved
org
PT Star Energy Investment
p.16 ×2
unresolved
org
PT SEI
p.16 ×5
unresolved
org
PT Tritunggal Artha Unggul. Subsequently
p.16
unresolved
org
PT Tritunggal Artha Unggul.
p.16
unresolved
org
Ministry of Justice and Human
p.16
unresolved
org
Kementerian Kehakiman
p.16
unresolved
org
PT SEGH’s ESDM
p.16
unresolved
org
Kementerian ESDM
p.16 ×5
unresolved
org
Holdings B.V.
p.17 ×2
unresolved
org
SEG-SD B.V.
p.17 ×19
unresolved
org
B.V. SD B.V.
p.17
unresolved
org
Chevron Darajat Ltd.
p.17
unresolved
org
Darajat Ltd.
p.17
unresolved
org
PT SEGSS
p.17 ×14
unresolved
org
PT Chevron
p.17 ×3
unresolved
org
PT Chevron Geothermal Suoh Sekincau
p.17 ×2
unresolved
org
PT DGI
p.17 ×15
unresolved
org
Chevron Corporation
p.17 ×2
unresolved
org
SEGD-II. SEG-SD B.V.
p.18
unresolved
person
Sutjipto
p.18 ×2
unresolved
org
Minister of Law Menteri Hukum dan Hak Asasi Manusia Republik
p.18
unresolved
org
Minister of Finance Decree Keuangan
p.19
unresolved
org
Star Energy Geothermal Salak Pratama Ltd.
p.21
unresolved
org
Bermuda Corporation
p.21
unresolved
org
Menteri Keuangan
p.22
unresolved
org
Minister of Finance Decree
p.22
unresolved
person
Jose Dima Satria
p.24 ×2
unresolved
org
Minister of Law and Human dan SEG-SD B.V.
p.24
unresolved
org
PT Chevron Geothermal Suoh
p.24
unresolved
person
Wang
p.24 ×2
unresolved
org
Bank Indonesia
p.30
unresolved
org
PT Griya Idola
p.121 ×5
unresolved
person
Kompensasi
· Komisaris
p.121
Extraction attempts how the parser did, and what it refused
Nothing structured was extracted from this document — the attempts below say why.
No extraction attempted yet.