         Keterbukaan Informasi Publik/Public Information Disclosure
     Perkembangan Operasional Perseroan/Company Opera onal Update

Fakta Material                                            Material Facts
1. Bahwa sebagaimana disampaikan dalam                    1. As previously reported in the information
    keterbukaan informasi pada 31 Oktober                    disclosure on October 31, 2024, the
    2024, Perseroan menghentikan sementara                   Company has temporarily stopped the
    operasionalisasi unit produksi Pabrik Kimia              operation of the production unit, the
    dan Serat di Karawang terhitung 1                        Chemical and Fiber factory in Karawang
    November 2024.                                           effective November 1, 2024.
2. Lingkungan bisnis Perseroan saat ini baik              2. The      Company's       current     business
    luar negeri (kelebihan kapasitas global,                 environment, both overseas (global
    kenaikan tarif ekspor ke USA, kenaikan                   overcapacity, increased export tariffs to the
    harga bahan baku) maupun dalam negeri                    USA, increased raw material prices) and
    (ketidakjelasan penerapan bea anti-                      domestically (the unclear application of
    dumping, revisi peraturan importasi yang                 anti-dumping duties, revised import
    belum sesuai harapan industri) telah                     regulations that do not meet industry
    menyebabkan lesunya permintaan produk                    expectations) has led to sluggish demand
    industri.                                                for the industry's products.
3. Sejumlah upaya saat ini masih berlangsung              3. A few efforts are currently ongoing to
    untuk menyelesaikan restrukturisasi utang                finalize the debt restructuring with the
    dengan Kementerian Keuangan, untuk                       Ministry of Finance, to reach a final
    mencapai kesepakatan akhir atas perbaikan                agreement on the revised proposal
    proposal yang diajukan Perseroan, tetapi                 submitted by the Company, but this process
    proses ini kemungkinan membutuhkan                       is likely to need much more time to
    waktu lebih lama untuk diselesaikan.                     conclude.
4. Selama ini Perseroan tetap terus menjaga               4. The Company has continued to maintain
    dan memelihara fasilitas unit produksi                   and safeguard the production facilities of
    Pabrik Kimia dan Serat di Karawang agar                  the Chemical and Fiber Factory in
    dapat dioperasionalkan kembali dalam                     Karawang so that they can be
    waktu dekat ketika terdapat solusi yang                  operationalized in the near future when a
    dapat dijalankan. Namun, pemeliharaan                    feasible solution is available. However,
    fasilitas unit produksi Pabrik Kimia dan                 maintaining the production unit facilities of
    Serat di Karawang dalam kondisi tidak                    the Chemical and Fiber Factory in
    beroperasi membutuhkan biaya yang tinggi.                Karawang in idle condition involves high
    Penghentian produksi yang berlangsung                    expenditure. Stoppage over an extended
    lebih dari enam bulan membuat                            period of over six months makes restart
    operasionalisasi kembali fasilitas unit                  technically and commercially unviable for
    produksi kami di Karawang menjadi tidak                  our facility of production unit in Karawang.
    layak secara teknis dan komersial.
 5. Oleh karena itu, perusahaan akan                      5. Therefore, the company will declare
    mendeklarasikan penutupan permanen unit                  permanent closure of this unit production
    produksi ini dan mengambil langkah-                      and take necessary steps to revise its
    langkah yang diperlukan untuk merevisi                   business projection based on its Kaliwungu
    proyeksi bisnisnya berdasarkan operasi                   -Kendal plant operation in the future.
    pabrik     Kaliwungu-Kendal      di    masa
    mendatang.




                                            PT Asia Pacific Fibers Tbk
             The EAST 35th floor Unit 7 Jl. DR Ide Anak Agung Gde Agung Kav. E3.2 No. 1 Jakarta 12950
                                  Phone: +6221-57938555 | Fax: +6221-57938563
Page 2
Dampak Fakta Material terhadap Kegiatan                   Impact of Material Facts on Operational
Operasional                                               Activities
1. Penutupan unit produksi di Karawang akan               1. Closure of the production unit in Karawang
   mengakibatkan       pendapatan     penjualan               will result in the Company's annual sales
   tahunan Perseroan tahun 2025 dan                           revenue in 2025 and thereafter being lower
   seterusnya menjadi lebih rendah dari tahun-                than in previous years.
   tahun sebelumnya.
2. Dalam waktu dekat, Perusahaan akan                     2. In the immediate future, the Company will
   melakukan revisi proyeksi keuangannya                     revise its financial projections in
   sesuai dengan keterbatasan operasional                    accordance with limited operation as an
   sebagai dampak penutupan unit produksi                    impact of this closure of the production unit
   Karawang ini.                                             Karawang.
3. Perseroan segera mereview dan mereposisi               3. The Company will immediately review and
   kembali      produk-produk     dan    faktor              reposition the products and other
   pendukung lainnya yang ada di unit                        supporting factors in the Kaliwungu
   produksi Pabrik Kaliwungu.                                Factory production unit.
4. Perseroan      akan    meneruskan     proses           4. The      Company      will    continue    the
   restrukturisasi yang sedang berlangsung saat              restructuring process currently underway,
   ini, untuk mencapai kesepakatan dengan                    to reach an agreement with creditors and
   para kreditur dan investor, sehingga                      investors, so that the Company has the
   Perseroan       berpeluang     mendapatkan                opportunity to obtain funding to increase its
   pendanaan          untuk      meningkatkan                production, upgrade its facility and improve
   produksinya, meningkatkan fasilitasnya dan                its return to stakeholders.
   memperbaiki hasil usahanya untuk para
   pemangku kepentingan.

Keputusan    ini   sangat penting    bagi                 This decision is very critical for the future of
keberlanjutan usaha di masa depan dan                     business operations and the Company requests
Perseroan meminta dukungan dan kerjasama                  support and cooperation from all concerned
dari semua pihak terkait dan pemangku                     parties and stakeholders.
kepentingan.
Jakarta, 21 Juli 2025/July 21st, 2025

Atas perhatian dan kerjasamanya kami ucapkan terima kasih.
We thank you for your kind attention.


Salam,                                      Regards,
Direksi Perseroan                           Company Directors




                                            PT Asia Pacific Fibers Tbk
             The EAST 35th floor Unit 7 Jl. DR Ide Anak Agung Gde Agung Kav. E3.2 No. 1 Jakarta 12950
                                  Phone: +6221-57938555 | Fax: +6221-57938563

File

File Open PDF
Source IDX
Size1.14 MB
Published21 Jul 2025
Pages2
Characters7,674
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 3 people and organisations named in the text · linked when the evidence is strong

linked org Asia Pacific Fibers Tbk p.1 ×5
unresolved org Kementerian Keuangan p.1
unresolved org Ministry of Finance p.1

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

Other files in this announcement 1

↑↓ select ↵ open ⇧↵ see every result