Skip to content
Back to announcement

20260714_CSIS_Laporan Penggunaan Dana Hasil Penawaran Umum_32111929_lamp3.pdf

Other Text extracted CSIS

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 3

Page 1
Detail Laporan Realisasi Penggunaan Dana

a. Rincian Biaya Penawaran Umum



                            Tanggal      Jumlah Hasil                               Biaya Penawaran Umum
    Jenis Penawaran Umum
                             Efektif   Penawaran Umum
                                                                        Uraian Biaya                       Jumlah       Persentase
             (1)              (2)            (3)                              (4)                           (5)            (6)
                                                          1 Biaya Jasa Notaris                             28,512,820       0.01%
                                                          2 Biaya Jasa Kantor Akuntan Publik           194,510,000          0.10%
                                                          3 Biaya Jasa Audit Penjatahan                    40,000,000       0.02%
      Penambahan Modal        11                          4 Biaya Jasa KJPP                            305,000,000          0.15%
      dengan memberikan    Desember     198,664,000,000   5 Biaya Jasa Konsultan Hukum                 255,051,020          0.13%
           HMETD             2025                         6 Biaya Jasa Aktuaria                             2,500,000       0.00%
                                                          7 Biaya Jasa KSEI                                33,312,500       0.02%
                                                          8 Biaya Jasa BAE                             100,000,000          0.05%
                                                          9 Biaya Lain-lain                            974,082,385          0.49%

                                                                                                      1,932,968,726         0.97%
Page 2
b. Rincian Rencana dan Realisasi Penggunaan Dana Hasil Penawaran Umum


                                                         Rencana Penggunaan Dana               Persentase                                          Realisasi Penggunaan Dana                                     Persentase
        Jenis                                                                                   Rencana
                   Tanggal      Jumlah Hasil                                                                                                                                                                      Realisasi
     Penawaran                                                       (4)                      Penggunaan                                                       (6)                                                            Deviasi   Keterangan
                    Efektif   Penawaran Umum                                                                                                                                                                   terhadap nilai
       Umum                                                                                  dana terhadap
                                                 Level       Deskripsi           Nilai                                                                                                                            hasil PU
                                                                                              nilai hasil PU
                                                                                                                                                   Deskripsi                                      Nilai
         (1)         (2)            (3)                                                            (5)                                                                                                              (7)         (8)         (9)

                                                                                                                     Pekerjaan Jalan Beton Tahap II Area Gate 3 Sisi Kanan dan Bundaran 2
                                                                                                                 -                                                                             2,172,000,000          1.10%     2.34%
                                                                                                                     Menuju Perempatan Gracia

                                                                                                                     Pekerjaan Jalan Beton Tahap 1 Seluas 3.000 m2 di Area Depan Hungfu s/d
                                                                                                                 -                                                                             1,086,000,000          0.55%     1.17%
                                                                                                                     Perempatan Gracia Sisi Kanan & Area Gate 3 Sesi 1 Sisi Kanan KIC


                                                                                                                 - Pekerjaan Cut and Fill Area Kavling Blok K-N1 Kawasan Industri Cikembar     2,008,908,000          1.02%     2.16%
                                                            Infrastruktur                                                                                                                                                               Pihak bukan
                                                - Level 1                   93,000,000,000           47.27%
                                                                 KIC                                                                                                                                                                       Afiliasi
                                                                                                                 - Pekerjaan Cut and Fill Blok N1 Tahap 2 di KIC                               3,209,245,000          1.63%     3.45%


    Penambahan                                                                                                       Pekerjaan Pemasangan CCSP/Sheetpile W350 area depan kandang ayam
                      11                                                                                         -                                                                             2,017,540,000          1.03%     2.17%
    Modal dengan                                                                                                     panjang area 266 meter di KIC
                   Desember   198,664,000,000
    memberikan
                     2025
      HMETD                                                                                                                                          Total                                    10,493,693,000          5.33%    11.28%


                                                            Infrastruktur
                                                - Level 2                   10,000,000,000               5.08%       -                                                                                    -               -       -
                                                             Panenjoan

                                                            Pembangunan
                                                - Level 3                    7,000,000,000               3.56%       -                                                                                    -               -       -
                                                             Gudang KIS

                                                            Pembebasan
                                                - Level 4                   83,695,120,000           42.54%          -                                                                                    -               -       -
                                                               Lahan

                                                            Operasional
                                                - Level 5                    3,035,911,274               1.54%       -                                                                                    -               -       -
                                                              Kantor
Page 3
c. Rincian Penempatan Sisa Dana


                           Tanggal                                                        Jangka Waktu   Tingkat Suku Bunga   Hubungan dengan
    Jenis Penawan Umum                Sisa Dana                  Penempatan
                           Efektif                                                         Penempatan      atau Imbal Hasil     Perusahaan

             (1)             (2)          (3)                        (4)                      (5)               (6)                  (7)

     Penambahan Modal        11                        Tabungan Giro IBK Bank Indonesia
     dengan memberikan    Desember   186,237,338,274                                           -              0.1% p.a          Bukan Afiliasi
          HMETD             2025                       No. Rekening 000900088601001

File

File Open PDF
Source IDX
Size0.61 MB
Published15 Jul 2026
Pages3
Characters9,208
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 1 people and organisations named in the text · linked when the evidence is strong

unresolved org Bank Indonesia p.3

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result