Skip to content
Back to announcement

20250711_ENRG_Laporan Informasi dan Fakta Material_31914122_lamp1.pdf

Other Text extracted ENRG

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 3

Page 1
 Jakarta, 11 Juli 2025
 No. 103/EMP.DIR/1070/07-25/E

 OTORITAS JASA KEUANGAN
 GEDUNG SOEMITRO DJOJOHADIKUSUMO
 JL. LAPANGAN BANTENG TIMUR NO. 2-4
 JAKARTA 10170

 U.P. : BAPAK INARNO DJAJADI
        KEPALA EKSEKUTIF PENGAWAS PASAR MODAL, KEUANGAN DERIVATIF,
        DAN BURSA KARBON

 PT BURSA EFEK INDONESIA
 INDONESIA STOCK EXCHANGE BUILDING
 JL. JEND. SUDIRMAN KAV. 52-53
 JAKARTA 12190

 U.P. : BAPAK IMAN RACHMAN
        DIREKTUR UTAMA


 PERIHAL :        KETERBUKAAN INFORMASI                RE. : INFORMATION DISCLOSURE


 Dengan Hormat,                                        Dear Sirs,

 Dalam   rangka    memenuhi           ketentuan        In order to meet the provisions as referred to
 sebagaimana dimaksud dalam:                           in:

 1.   Peraturan Otoritas Jasa Keuangan                 1. Financial Services Authority Regulation
      (“POJK”) No. 31/POJK.04/2015 tentang                (“POJK”)      No.     31/POJK.04/2015
      Keterbukaan atas Informasi atau Fakta               concerning Disclosure of Information or
      Material oleh Emiten atau Perusahaan                Material Facts by Issuers or Public
      Publik; dan                                         Companies; and

 2.   Peraturan PT Bursa Efek Indonesia                2. Regulation of the Indonesian Stock
      Nomor     I-E    tentang Kewajiban                  Exchange Number I-E concerning
      Penyampaian Informasi.                              Obligations for Information Submission.

 PT Energi Mega Persada Tbk (“Perseroan”)              PT Energi Mega Persada Tbk (the
 dengan ini menyampaikan bahwa anak usaha              “Company”) hereby inform that its 48%
 yang sahamnya dimiliki 48% oleh Perseroan,            owned subsidiary, PT Pema Global Energi
 yaitu PT Pema Global Energi (“PGE”), telah            (“PGE”) signed a Memorandum of
 menandatangani Nota Kesepahaman dengan                Understanding (“MoU”) with PT Pupuk
 PT Pupuk Indonesia (Persero) (“PI”) untuk             Indonesia (Persero) (“PI”) to develop the
 rencana pengembangan fasilitas Carbon                 Carbon Capture Utilization Storage (“CCUS”)
 Capture Storage (“CCS”) dan Carbon Capture            and the Carbon Capture Storage (“CCS”)
 Utilization Storage (“CCUS”) di Wilayah Kerja         facilities in its “B” gas block which includes
 “B” yang mencakup lapangan gas Arun di                the Arun gas field in Aceh.
 Aceh.



PT Energi Mega Persada Tbk   Bakrie Tower 32nd Floor          Jl. HR. Rasuna Said   p +62 21 2994 1540
                             Rasuna Epicentrum                Jakarta 12940         f +62 21 2994 1247
                                                              Indonesia
Page 2
Teknologi CCUS dapat menangkap emisi            The CCUS technology would enable us to
CO2 (yang dihasilkan oleh fasilitas produksi    capture the CO2 (released from our
yang ada) dan diinjeksikan kembali ke dalam     operational plant) and inject it to the
reservoir yang masih produktif untuk            productive reservoir to increase the oil & gas
meningkatkan produksi migas yang ada.           production. Once the production reached the
Setelah produksi mencapai titik optimum,        optimum level, then there is a transition to the
barulah terjadi peralihan ke fase CCS yang      CCS phase where the injection of captured
mana injeksi atas CO2 yang ditangkap            CO2 is carried out without any increase in
dilakukan    tanpa     adanya   peningkatan     production.
produksi.

Berdasarkan studi geological and geophysical    Based on the geological and geophysical
reservoir pada tahun 2023, lapangan gas         reservoir study in 2023, the Arun gas field has
Arun memiliki karakteristik yang tepat untuk    the right characteristics for the CCS and
program pengembangan fasilitas CCS dan          CCUS facilities. The Arun gas field has
CCUS. Lapangan gas Arun memiliki reservoir      limestone reservoir with seal rocks which
batu gamping (limestone) dengan batuan          formed a good place to store CO2 and It will
penutup (seal rock) yang sangat baik untuk      also minimize the possible CO2 leakage to
tempat penyimpanan CO2 dan dapat                the surface. The Arun gas field is also
meminimalkan       kebocoran     CO2      ke    strategically located which is near the
permukaan. Lapangan gas Arun juga memiliki      productive Malacca Strait area that can serve
lokasi yang strategis di dekat area Selat       as the shipping hub of the CO2 produced
Malaka yang sangat sibuk sehingga dapat         from various sources. In total, the Arun gas
menjadi hub dari berbagai sumber penghasil      field has the capacity to store up to 10 trillion
CO2. Lapangan gas Arun diestimasikan            cubic feet or 504 million tonnes of CO2.
dapat menyimpan sekitar 10 trilyun kaki kubik
atau 504 juta ton CO2.

Dengan pengembangan fasilitas CCS / CCUS        With such initiatives to explore the
di Wilayah Kerja “B” ini, Perseroan berharap    opportunities to build the CCS / CCUS
dapat mendukung rencana Pemerintah untuk        facilities in the “B” gas block, it is hoped that
mencapai target net zero emission di tahun      Company could support the Government’s
2060. Pada kuartal pertama tahun ini, Wilayah   plan to reach the net zero emission target by
Kerja “B” telah memproduksikan sekitar 45       end of year 2060. In the first quarter 2025, the
juta kaki kubik gas per hari dan 1.033 barel    “B” gas block has average production of
minyak per hari. Blok tersebut juga             around 45 million cubic feet gas per day and
mengoperasikan cadangan terbukti dan            1,033 barrels of oil per day. It operates
terukur sebesar 159 milyar kaki kubik gas dan   proved and probable reserves of 159 billion
10,8 juta barel minyak.                         cubic feet of gas and 10.8 million barrels of
                                                oil.

Perseroan       juga     berharap      agar     The Company also hopes that the signing of
penandatanganan Nota Kesepahaman dapat          the Memorandum of Understanding will
memajukan sektor industri di Aceh dan           advance the industrial sector in Aceh and
sebagai usaha pengurangan karbon di sektor      contribute to carbon reduction efforts in the
industri yang ada. Perseroan percaya            existing industrial sector. The Company
CCS/CCUS akan menjadi babak baru bagi           believes that CCS/CCUS will mark a new
lapangan gas Arun yang dikelola oleh PGE.       chapter for the Arun gas field managed by
Bersama PI, Perseroan akan mewujudkan           PGE. Together with PI, the Company will
sinergi di antara energi bersih dan industri    realize synergies between clean energy and
strategis nasional.                             the nation’s strategic industries.




                                                                                                    2
Page 3
Anak usaha EMP lainnya, yaitu EMP Gebang        EMP’s other subsidiary, EMP Gebang
Limited   juga   menandatangani      Nota       Limited also signed a Memorandum of
Kesepahaman dengan PI untuk penjualan           Understanding with PI to sell the gas to be
gas yang akan diproduksikan oleh blok gas       produced by the Gebang gas block
Gebang (“Gebang”) di Sumatera Utara             (“Gebang”) in North Sumatera to PI in the
kepada PI                                       future.

Dari diskusi Perseroan sebelumnya, PI           From the Company’s previous discussion, PI
membutuhkan sekitar 100 juta kaki kubik gas     require around 100 million cubic feet of gas
per harinya untuk pengoperasian pabrik-         supply per day to operate its factories.
pabriknya. Gebang diharapkan dapat              Gebang gas block is expected to commence
memulai produksi gasnya sekitar 40 juta kaki    gas production of 40 million cubic feet per day
kubik per hari di semester pertama tahun        in the first half of 2027. The production will
2027. Produksi gas tersebut diharapkan akan     further increase to 140 million cubic feet of
meningkat sampai dengan 140 juta kaki kubik     gas per day in year 2030. PI will be
gas per hari di tahun 2030. PI merupakan        considered as one of Gebang’s gas buyers in
salah satu target market atas gas yang          the future.
diproduksikan oleh Gebang di masa
mendatang.

Selain itu, alokasi gas untuk PI sejalan        In addition, the allocation of gas for PI aligns
dengan       program     Pemerintah     untuk   with the Government's program to encourage
mendorong        kemandirian    energi   dan    energy independence and continue the
melanjutkan       program    hilirisasi  dan    downstream and industrialization programs.
industrialisasi.

Demikian hal ini kami sampaikan, apabila ada    If there is other information or material facts,
informasi ataupun fakta material lainnya akan   we will submit it to the Financial Services
kami sampaikan kepada Otoritas Jasa             Authority and the Indonesia Stock Exchange.
Keuangan dan PT Bursa Efek Indonesia.

Atas perhatian Bapak kami ucapkan terima        Thank you for your attention.
kasih.



Hormat Kami,
PT ENERGI MEGA PERSADA Tbk




Syailendra S. Bakrie                                Edoardus Ardianto
Direktur Utama                                      Wakil Direktur Utama

Tembusan Yth.:
  -  Deputi Komisioner Pengawas Pasar Modal II
  -  Direktur Penilaian Keuangan Perusahaan Sektor Riil




                                                                                                   3

File

File Open PDF
Source IDX
Size0.44 MB
Published11 Jul 2025
Pages3
Characters9,525
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 13 people and organisations named in the text · linked when the evidence is strong

linked org Energi Mega Persada Tbk p.1 ×11
linked person Syailendra S. Bakrie p.3
linked person Edoardus Ardianto p.3
possible org OTORITAS JASA KEUANGAN p.1 ×2
possible org PT BURSA EFEK INDONESIA p.1 ×3
possible org PT Pupuk Indonesia (Persero) p.1
unresolved person INARNO DJAJADI KEPALA EKSEKUTIF PENGAWAS p.1
unresolved org PT BURSA EFEK INDONESIA INDONESIA STOCK EXCHANGE BUILDING p.1
unresolved org INDONESIA STOCK EXCHANGE p.1 ×2
unresolved person IMAN RACHMAN p.1
unresolved org Financial Services Authority p.1
unresolved org PT Pema Global Energi p.1 ×2
unresolved org EMP Gebang Limited p.3

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

Other files in this announcement 1

↑↓ select ↵ open ⇧↵ see every result