Skip to content
Back to announcement

20250708_RMKE_Laporan Bulanan Aktivitas Eksplorasi_31912601.pdf

Other Text extracted RMKE

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 2

Page 1
Go To English Page

 Nomor Surat                          27/CS/RMKO/07/2025

 Nama Perusahaan                      PT RMK Energy Tbk

 Kode Emiten                          RMKE

 Lampiran                             1

 Perihal                              Laporan Bulanan Aktivitas Eksplorasi

Perseroan melaporkan aktivitas eksplorasi untuk APR 2025 Sebagai Berikut :

                                                                                       Hasil aktivitas
      Nama             Area yang
                                    Total biaya yang    Pihak yang      Metode          eksplorasi
   Perusahaan/         dilakukan                                                                       Rencana tindak
                                          telah         melakukan    pengujian dan     hingga akhir
      Anak              aktivitas                                                                          lanjut
                                      dikeluarkan       eksplorasi   pemilihan area       periode
   perusahaan          eksplorasi
                                                                                       pelaporan ini
  PT Truba Bara        Kecamatan     1.050.541.723     PT Truba Bara   Metode            titik bor yang Melanjutkan titik
   Banyu Enim           Gunung                          Banyu Enim   Pemboran Full       telah selesai pemboran stage
                        Megang,                                        Corring           berjumlah 11    selanjutnya
                       Kabupaten                                                      titik pengeboran
                       Muara Enim                                                        dengan total
                        Provinsi                                                           kedalaman
                     Sumatra Selatan                                                   1.302,00 meter
                                                                                      yang terdiri dari
                                                                                        125,50 meter
                                                                                           Coring dan
                                                                                       1.176,50 meter
                                                                                          Non Coring

 Demikian untuk diketahui.


 Hormat Kami,
 PT RMK Energy Tbk




 Vincent Saputra

 Direktur




 PT RMK Energy Tbk
 Wisma RMK Lantai 2
 Telepon : (021) 582 2555, Fax : (021) 582 2555, www.rmkenergy.com



 Nama Pengirim                        Vincent Saputra

 Jabatan                              Direktur
 Tanggal dan Waktu                    08-07-2025 15:04

 Lampiran                            1. Laporan Eksplorasi Periode Apr-Jun 2025.pdf


     Dokumen ini merupakan dokumen resmi PT RMK Energy Tbk yang tidak memerlukan tanda tangan karena
  dihasilkan secara elektronik oleh sistem pelaporan elektronik. PT RMK Energy Tbk bertanggung jawab penuh atas
                                      informasi yang tertera didalam dokumen ini.
Page 2
Go To Indonesian Page

 Letter / Announcement No.           27/CS/RMKO/07/2025

 Issuer Name                         PT RMK Energy Tbk

 Issuer Code                         RMKE

 Attachment                          1

 Subject                             Monthly Exploration Activities Report

The Company reports exploration activities for APR 2025 as follows :

 Company name/ Exploration               Total cost      Parties      Testing methods    Results of     Follow up plan
   Subsidiary  activities area            incurred     exploration     and selection     exploration
                                                                            area       activities until
                                                                                       the end of the
                                                                                      reporting period

  PT Truba Bara       Kecamatan     1,050,541,723     PT Truba Bara   Metode              titik bor yang Melanjutkan titik
   Banyu Enim          Gunung                          Banyu Enim   Pemboran Full         telah selesai pemboran stage
                       Megang,                                        Corring             berjumlah 11    selanjutnya
                      Kabupaten                                                        titik pengeboran
                      Muara Enim                                                          dengan total
                       Provinsi                                                             kedalaman
                    Sumatra Selatan                                                     1.302,00 meter
                                                                                       yang terdiri dari
                                                                                         125,50 meter
                                                                                            Coring dan
                                                                                        1.176,50 meter
                                                                                           Non Coring

 Thus to be informed accordingly.


 Respectfully,
 PT RMK Energy Tbk




 Vincent Saputra

 Direktur




 PT RMK Energy Tbk
 Wisma RMK Lantai 2
 Phone : (021) 582 2555, Fax : (021) 582 2555, www.rmkenergy.com



 Sender Name                         Vincent Saputra

 Function                            Direktur

 Date and Time                       08-07-2025 15:04

 Attachment                         1. Laporan Eksplorasi Periode Apr-Jun 2025.pdf


       This is an official document of PT RMK Energy Tbk that does not require a signature as it was generated
      electronically by the electronic reporting system. PT RMK Energy Tbk is fully responsible for the information
                                               contained within this document.

File

File Open PDF
Source IDX
Size0.01 MB
Published8 Jul 2025
Pages2
Characters6,139
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 9 people and organisations named in the text · linked when the evidence is strong

linked org RMK Energy Tbk · Nama Perusahaan p.1 ×30
linked person Vincent Saputra · Direktur p.1 ×5
unresolved org PT Truba Bara p.1 ×4
unresolved org Kabupaten p.1
unresolved — Muara Enim p.1
unresolved org Provinsi p.1
unresolved — Sumatra Selatan p.1
unresolved — Nama Pengirim p.1
unresolved person Function · Direktur p.2

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result