Skip to content
Back to announcement

20250630_PGEO_Laporan Informasi dan Fakta Material_31909420.pdf

Other Text extracted PGEO

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 7

Page 1
Go To English Page

 Nomor Surat                           327/PGE500/2025-S0

 Nama Perusahaan                       PT Pertamina Geothermal Energy Tbk

 Kode Emiten                           PGEO

 Lampiran                              0
                                       Presiden Prabowo Resmikan Proyek Energi Terbarukan di 15 Provinsi, PGE
 Perihal
                                       Mulai Eksplorasi PLTP Gunung Tiga 55 MW


Dengan ini kami untuk dan atas nama perusahaan menyampaikan Laporan Informasi atau Fakta Material sebagai
berikut:

 Nama Emiten atau Perusahaan Publik            PT Pertamina Geothermal Energy Tbk

 Bidang Usaha                                  Menyelenggarakan usaha bidang panas bumi dari hulu/hilir



 Telepon                                       +62 21 3983 3222

 Faksimili                                     +62 21 3983 3230

 Alamat Surat Elektronik (email)               datapge@pertamina.com


 Tanggal Kejadian                              30 Juni 2025
 Jenis Informasi atau Fakta Material           Presiden Prabowo Resmikan Proyek Energi Terbarukan di 15
                                               Provinsi, PGE Mulai Eksplorasi PLTP Gunung Tiga 55 MW
Page 2
Uraian Informasi atau Fakta Material   Presiden Republik Indonesia Prabowo Subianto meresmikan
                                       pembangunan dan pengoperasian proyek energi terbarukan
                                       yang tersebar di 15 provinsi di Indonesia. Salah satu proyek
                                       yang turut diresmikan adalah proyek eksplorasi (green field)
                                       Pembangkit Listrik Tenaga Panas Bumi (PLTP) Gunung Tiga
                                       sebesar 55 megawatt (MW) milik PT Pertamina Geothermal
                                       Energy Tbk (PGE) (IDX: PGEO). Peresmian ini dilakukan
                                       secara simbolis dari Bondowoso, Jawa Timur, sebagai bagian
                                       dari komitmen nasional dalam mempercepat transisi energi
                                       bersih. Proyek PLTP Gunung Tiga menjadi langkah strategis
                                       PGE dalam mendukung pencapaian target peningkatan
                                       kapasitas panas bumi nasional hingga 5,2 gigawatt (GW) pada
                                       periode 2025-2034.

                                       Presiden Prabowo Subianto mengatakan ketersediaan energi
                                       menjadi bagian sangat penting dalam kedaulatan suatu
                                       bangsa. Presiden menyampaikan Indonesia patut bersyukur
                                       karena memiliki sumber-sumber energi yang luar biasa.

                                       Sumber-sumber energi terbarukan ada di kita, tinggal kita
                                       mengelola dengan baik. Hari ini bukti kemampuan bangsa
                                       Indonesia untuk menuju swasembada energi yang sangat
                                       menentukan bagi masa depan bangsa, kata Presiden dalam
                                       sambutannya.

                                       Turut mendampingi Presiden, Menteri Energi dan Sumber
                                       Daya Mineral (ESDM) Bahlil Lahadalia dalam sambutannya
                                       mengatakan pembangunan pembangkit Energi Baru
                                       Terbarukan (EBT) turut berperan dalam mendorong
                                       pertumbuhan industri lokal dengan tingkat kandungan dalam
                                       negeri (TKDN) mencapai 40% serta menyerap lebih dari 9.500
                                       tenaga kerja secara nasional.

                                       Sebagai bagian dari rangkaian agenda nasional ini, PGE pun
                                       menggelar peletakan batu pertama eksplorasi proyek PLTP
                                       Gunung Tiga di Lampung. Acara ini dihadiri oleh Sekretaris
                                       Daerah Provinsi Lampung Dr. Marindo Kurniawan S.T.,M.M,
                                       Perwakilan Direktorat Panas Bumi Ditjen EBTKE Kementerian
                                       ESDM Bambang Purbiantoro, Wakil Bupati Tanggamus Agus
                                       Suranto, dan Direktur Operasional PT Pertamina Geothermal
                                       Energy Tbk Ahmad Yani.

                                       Hadirnya PLTP Gunung Tiga menjadi sangat strategis bagi
                                       PGE. Direktur Utama PT Pertamina Geothermal Energy Tbk
                                       Julfi Hadi mengatakan PLTP Gunung Tiga menjadi salah satu
                                       prospek panas bumi yang berada dalam Wilayah Kerja Panas
                                       Bumi (WKP) Gunung Waypanas, bersama dengan proyek
                                       Ulubelu. Eksplorasi ini ditujukan untuk mengonfirmasi potensi
                                       cadangan energi panas bumi yang diharapkan bisa menjadi
                                       sumber energi bersih berbasis lokal (indigenous energy) guna
                                       memperkuat ketahanan energi dan mendukung pencapaian
                                       target bauran EBT nasional. Sebagai langkah awal,
                                       pembangunan infrastruktur dimulai pada April 2025.

                                       Dengan potensi besar yang kami miliki, kami percaya PGE
                                       akan terus berkontribusi secara signifikan dalam membangun
                                       ekosistem energi hijau yang berkelanjutan, ujarnya.

                                       Lebih jauh Julfi menjelaskan, Gunung Tiga yang terletak di
                                       sebelah selatan area eksisting Ulubelu, memiliki karakteristik
                                       panas bumi yang menjanjikan dan sangat strategis untuk
                                       pengembangan pembangkit panas bumi. Ia menambahkan
                                       keunggulan utama panas bumi terletak pada sifatnya yang
Page 3
                                           andal dan stabil karena tidak bergantung pada kondisi cuaca
                                           seperti sinar matahari atau angin.

                                           Eksplorasi dilakukan secara bertahap melalui tiga sumur,
                                           dengan menerapkan standar keselamatan yang ketat,
                                           perlindungan lingkungan, serta pengelolaan risiko yang
                                           menyeluruh. Seluruh aktivitas telah melalui kajian Analisis
                                           Mengenai Dampak Lingkungan (AMDAL), dan setiap tahap
                                           akan diawasi ketat guna untuk meminimalkan dampak
                                           terhadap ekosistem sekitar, jelas Julfi.

                                           Sebagai pionir pengembangan energi panas bumi di Indonesia
                                           dengan pengalaman lebih dari 40 tahun, PGE saat ini
                                           mengelola kapasitas terpasang sebesar 672,5 MW dari enam
                                           wilayah operasi. Perusahaan menargetkan peningkatan
                                           kapasitas menjadi 1 GW dalam dua tahun mendatang, dan
                                           mencapai 1,7 GW pada 2034. Selain pengoperasian Lumut
                                           Balai Unit 2, PGE juga tengah mengembangkan sejumlah
                                           proyek strategis seperti PLTP Hululais Unit 1 & 2 (110 MW),
                                           serta beberapa proyek co-generation dengan total kapasitas
                                           230 MW.

                                           PGE juga telah mengidentifikasi potensi sumber daya panas
                                           bumi sebesar 3 GW dari 10 WKP yang dikelola secara
                                           mandiri, mempertegas komitmen perusahaan dalam
                                           mendukung ketahanan dan keberlanjutan energi nasional.

Dampak kejadian, informasi atau fakta
material tersebut terhadap kegiatan
operasional, hukum, kondisi keuangan,
atau kelangsungan usaha Emiten atau
Perusahaan Publik



Demikian untuk diketahui.


Hormat Kami,
PT Pertamina Geothermal Energy Tbk




Kitty Andhora

Corporate Secretary




PT Pertamina Geothermal Energy Tbk
Grha Pertamina - Tower Pertamax Lt.7
Telepon : +62 21 3983 3222, Fax : +62 21 3983 3230, https://www.pge.pertamina.



Nama Pengirim                     Kitty Andhora

Jabatan                           Corporate Secretary
Tanggal dan Waktu                 30-06-2025 09:13
Page 4
   Dokumen ini merupakan dokumen resmi PT Pertamina Geothermal Energy Tbk yang tidak memerlukan tanda
tangan karena dihasilkan secara elektronik oleh sistem pelaporan elektronik. PT Pertamina Geothermal Energy Tbk
                   bertanggung jawab penuh atas informasi yang tertera didalam dokumen ini.
Page 5
Go To Indonesian Page

 Letter / Announcement No.           327/PGE500/2025-S0

 Issuer Name                         PT Pertamina Geothermal Energy Tbk

 Issuer Code                         PGEO

 Attachment                          0

 Subject                             President Prabowo Inaugurates Renewable Energy Projects in 15 Provinces,
                                     PGE Starts Exploration for 55 MW Gunung Tiga PLTP

The company hereby announce the Material Information or Facts Report as follows

 Name of Issuer or Public Company            PT Pertamina Geothermal Energy Tbk

 Business Activities                         Menyelenggarakan usaha bidang panas bumi dari hulu/hilir


 Telephone                                   +62 21 3983 3222

 Faximile                                    +62 21 3983 3230

 Email Address                               datapge@pertamina.com


 Date of Event                               30 June 2025

                                             President Prabowo Inaugurates Renewable Energy Projects in
 Type of Material Information or Facts       15 Provinces, PGE Starts Exploration for 55 MW Gunung Tiga
                                             PLTP
Page 6
Description of Material Information or   President of the Republic of Indonesia Prabowo Subianto
Facts                                    inaugurated the construction and operation of renewable
                                         energy projects spread across 15 provinces in Indonesia on
                                         Thursday. One of the projects inaugurated was the 55
                                         megawatt (MW) Gunung Tiga Geothermal Power Plant (PLTP)
                                         exploration project (green field) owned by PT Pertamina
                                         Geothermal Energy Tbk (PGE) (IDX: PGEO). The inauguration
                                         was carried out symbolically from Bondowoso, East Java, as
                                         part of the national commitment to accelerate the clean energy
                                         transition. The Gunung Tiga geothermal power plant project is
                                         PGE's strategic step in supporting the achievement of the
                                         national geothermal capacity increase target of up to 5.2
                                         gigawatts (GW) in the 2025-2034 period.

                                         President Prabowo Subianto said that energy availability is a
                                         very important part of a nation's sovereignty. The President
                                         said that Indonesia should be grateful for having extraordinary
                                         energy sources.

                                         Renewable energy sources are available to us, we just need to
                                         manage them well. Today is proof of Indonesia's ability to
                                         achieve energy self-sufficiency, which is very decisive for the
                                         future of the nation, the President said in his remarks.

                                         Accompanying the President, Minister of Energy and Mineral
                                         Resources Bahlil Lahadalia in his remarks said that the
                                         development of New Renewable Energy (EBT) plants also
                                         plays a role in encouraging the growth of local industries with a
                                         domestic content level (TKDN) reaching 40% and absorbing
                                         more than 9,500 workers nationally.

                                         As part of this national agenda, PGE also held a
                                         groundbreaking ceremony for the exploration of the Gunung
                                         Tiga PLTP project in Lampung. The event was attended by
                                         Regional Secretary of Lampung Province Dr. Marindo
                                         Kurniawan S.T., M.M, Representative of the Directorate of
                                         Geothermal Directorate General of EBTKE of the Ministry of
                                         Energy and Mineral Resources Bambang Purbiantoro, Deputy
                                         Regent of Tanggamus Agus Suranto, and Director of
                                         Operations of PT Pertamina Geothermal Energy Tbk Ahmad
                                         Yani.

                                         The presence of PLTP Gunung Tiga is very strategic for PGE.
                                         President Director of PT Pertamina Geothermal Energy Tbk
                                         Julfi Hadi said that the Gunung Tiga geothermal plant is one of
                                         the geothermal prospects in the Mount Waypanas Geothermal
                                         Working Area (WKP), along with the Ulubelu project. This
                                         exploration is aimed at confirming the potential of geothermal
                                         energy reserves which are expected to become a source of
                                         indigenous energy to strengthen energy security and support
                                         the achievement of the national renewable energy mix target.
                                         As a first step, infrastructure development began in April 2025.

                                         With our huge potential, we believe PGE will continue to
                                         contribute significantly in building a sustainable green energy
                                         ecosystem, he said.

                                         Julfi further explained that Gunung Tiga, located to the south
                                         of the existing Ulubelu area, has promising geothermal
                                         characteristics and is very strategic for the development of
                                         geothermal plants. He added that the main advantage of
                                         geothermal lies in its reliable and stable nature because it
                                         does not depend on weather conditions such as sunlight or
Page 7
                                              wind.

                                              Exploration is conducted in stages through three wells,
                                              applying strict safety standards, environmental protection, and
                                              comprehensive risk management. All activities have gone
                                              through an Environmental Impact Assessment (AMDAL) study,
                                              and each stage will be closely monitored to minimize the
                                              impact on the surrounding ecosystem, Julfi explained.

                                              As a pioneer of geothermal energy development in Indonesia
                                              with more than 40 years of experience, PGE currently
                                              manages an installed capacity of 672.5 MW from six operating
                                              areas. The company targets to increase its capacity to 1 GW in
                                              the next two years, and reach 1.7 GW by 2034. In addition to
                                              the operation of Lumut Balai Unit 2, PGE is also developing a
                                              number of strategic projects such as the Hululais PLTP Units 1
                                              & 2 (110 MW), as well as several co-generation projects with a
                                              total capacity of 230 MW.

                                              PGE has also identified potential geothermal resources of 3
                                              GW from 10 WKPs that are managed independently,
                                              emphasizing the company's commitment in supporting national
                                              energy security and sustainability.

 Impact of event, material information or
 facts towards Issuers or Public
 Company’s operational activities, legal,
 financial condition, or going concern




Thus to be informed accordingly.


Respectfully,
PT Pertamina Geothermal Energy Tbk




Kitty Andhora

Corporate Secretary




PT Pertamina Geothermal Energy Tbk
Grha Pertamina - Tower Pertamax Lt.7
Phone : +62 21 3983 3222, Fax : +62 21 3983 3230, https://www.pge.pertamina.com



Sender Name                          Kitty Andhora

Function                             Corporate Secretary

Date and Time                        30-06-2025 09:13




   This is an official document of PT Pertamina Geothermal Energy Tbk that does not require a signature as it was
      generated electronically by the electronic reporting system. PT Pertamina Geothermal Energy Tbk is fully
                            responsible for the information contained within this document.

File

File Open PDF
Source IDX
Size0.02 MB
Published30 Jun 2025
Pages7
Characters19,012
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 12 people and organisations named in the text · linked when the evidence is strong

linked org Pertamina Geothermal Energy Tbk · Nama Perusahaan p.1 ×54
linked person Ahmad Yani. p.2 ×2
linked person Julfi Hadi p.2 ×2
unresolved org Menteri Energi dan Sumber Daya Mineral p.2
unresolved org Daerah Provinsi Lampung Dr. Marindo Kurniawan S.T. p.2
unresolved org Kementerian ESDM Bambang Purbiantoro p.2
unresolved person PGE. · Direktur Utama p.2
unresolved person Kitty Andhora · Corporate Secretary p.3 ×2
unresolved org Minister of Energy and Mineral Resources Bahlil Lahadalia p.6
unresolved person Lampung Province Dr. Marindo Kurniawan S.T. p.6 ×3
unresolved org Directorate General of EBTKE p.6
unresolved org Ministry of Energy and Mineral Resources Bambang Purbiantoro p.6

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result