Skip to content
Back to announcement

20260710_GEMS_Laporan Bulanan Aktivitas Eksplorasi_32110825_lamp1.pdf

Other Text extracted GEMS

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 6

Page 1
No. 058/GEMS-CS/VII/2026                                                                                      Jakarta, 10 Juli 2026

Kepada Yth.:
Direksi PT Bursa Efek Indonesia
Gedung Bursa Efek Indonesia Tower I
Jln. Jend. Sudirman Kav 52-53
Jakarta 10190

U.p. : : Kepala Divisi Penilaian Perusahaan 2) /
       Head of Corporate Valuation Division 2

Perihal : Laporan Aktivitas Eksplorasi periode Q2 2026              Subject : Exploration Activity Q2 2026 Report

Dengan hormat,                                                      Sincerely,

Sehubungan dengan Peraturan PT Bursa Efek Indonesia                 In accordance to Indonesia Stock Exchange Regulation
Nomor I-E tanggal 12 Desember 2025 tentang Kewajiban                No. I-E dated 12 Desember 2025 concerning
Penyampaian Informasi, maka dengan ini kami                         Information Submission Obligation, we hereby submit
sampaikan Laporan Aktivitas Eksplorasi Pertambangan                 the Exploration Activity for the period of Q2 2026 of the
periode Q2 2026 di lingkungan anak-anak Perusahaan                  Company’s subsidiaries as attached.
PT Golden Energy Mines Tbk (“Perseroan”) sebagaimana
terlampir.

Dalam      hal     terdapat  perbedaan penafsiran                   In the event there is any difference of
informasi yang diumumkan dalam Bahasa Inggris dan                   interpreting the information notified in English
Bahasa Indonesia, maka informasi yang digunakan                     language and Indonesian language, the Indonesian
sebagai acuan adalah informasi dalam Bahasa                         language shall prevail.
Indonesia.

Demikian kami sampaikan. Atas perhatiannya kami Thank you for your attention and co-operation.
ucapkan terima kasih.

Hormat kami/Sincerely yours,
PT Golden Energy Mines Tbk




Sudin, SH
Corporate Secretary



Tembusan/Copies :
   - Direksi Perseroan/Board of Directors of the Company.
                                        PT. Golden Energy Mines Tbk.
               Sinar Mas Land Plaza Tower II, 6th Floor Jl. MH. Thamrin No. 51 Kav. 22, Jakarta Pusat 10350
                                   Phone: (62) 21 50186 888 , Fax: (62) 21 3199 0319
                                        Website: www.goldenenergymines.com
Page 2
1. PT Kuansing Inti Makmur (“KIM”) dan anak perusahaan
   (KIM Blok) / and its subsidiaries (KIM Block)
   Tidak ada kegiatan eksplorasi di area KIM Blok pada There is no exploration activity in the mine area of
   periode Q2 2026.                                    KIM Block for the period of Q2 2026.

2. PT Borneo Indobara (“BIB”)
   2.1. Daerah Eksplorasi                                  2.1. Exploration Activity
        Kegiatan pengeboran eksplorasi meliputi 3 kegiatan      Exploration drilling activities include 3 main
        utama, yaitu pengeboran eksplorasi preproduksi,         activities, namely preproduction exploration
        pengeboran eksplorasi pengembangan, dan                 drilling, development exploration drilling, and
        pengeboran geoteknik.                                   geotechnical drilling.
        Kegiatan pengeboran preproduksi dilakukan untuk         Preproduction drilling activities are carried
        melengkapi data pemodelan geologi dan kualitas          out to complement geological modeling data
        batubara pada masing-masing area. Pengeboran            and coal quality in each area. Development
        eksplorasi     pengembangan       bertujuan untuk       exploration drilling aims to obtain lithology
        mendapatkan data litologi dan kualitas batubara         and coal quality data for geological modeling
        untuk pembuatan model geologi serta mendukung           and to support the addition of new coal
        penambahan sumberdaya batubara baru pada area           resources in areas where exploration has
        yang belum pernah dilakukan kegiatan eksplorasi.        never been carried out. Geotechnical drilling
        Kegiatan pengeboran geoteknik dilakukan untuk           activities are carried out to determine the
        mengetahui daya dukung tanah dan sifat fisik            carrying capacity of the soil and the physical
        batuan pada area pit penambangan dan disposal           properties of the rock in the mining area and
        serta di area project perusahaan.                       disposal area in the company.
        Kegiatan pengeboran periode Q2 2026 dilakukan           Drilling activities in Q2 2026 were carried out
        pengeboran eksplorasi preproduksi di area Kusan -       by preproduction exploration in Kusan –
        Girimulya dan pengeboran geoteknik di area Kusan.       Girimulya and geotechnical drilling in Kusan.

  2.2. Metode Pengeboran                                  2.2. Drilling Methods
       Pada periode Q2 2026, pengeboran eksplorasi             For the period of Q2 2026, preproduction
       preproduksi dilakukan dengan metode open hole           exploration drilling was carried out using
       dan part coring. Kegiatan geofisika logging             open holes and part coring. Geophysical
       dilakukan di seluruh lubang bor yang telah selesai      logging activities are carried out in all drilled
       dilakukan untuk memastikan kedalaman top dan            holes that have been completed to ensure
       bottom batubara sehingga ketebalan batubara             the depth of the top and bottom of the coal
       dapat diketahui lebih akurat dan untuk mengetahui       so that the thickness of the coal can be
       varian dan karakteristik batuan non batubara            known more accurately and to determine the
       berdasarkan perekaman gelombang gamma ray dan           characteristics of non-coal rock based on
       density.                                                recording gamma ray waves and density.

  2.3. Pelaksanaan dan Pengawasan Kegiatan Eksplorasi 2.3. Exploration Activities Progress & Supervision
       Kegiatan pengeboran eksplorasi dan geoteknik        Exploration and geotechnical drilling activities
       dilakukan oleh Departemen Survey, Geotech &         carried out by the Survey, Geotech &
       Exploration (SGE) BIB.                              Exploration (SGE) Department of BIB.


                                           PT. Golden Energy Mines Tbk.
                  Sinar Mas Land Plaza Tower II, 6th Floor Jl. MH. Thamrin No. 51 Kav. 22, Jakarta Pusat 10350
                                      Phone: (62) 21 50186 888 , Fax: (62) 21 3199 0319
                                           Website: www.goldenenergymines.com
Page 3
        Untuk mendukung kegiatan pengeboran eksplorasi                         To support the preproduction exploration
        preproduksi dan eksplorasi pengembangan berupa                         drilling and development exploration
        pengeboran open hole dan coring digunakan 2 unit                       activities such as open hole and coring
        rig inhouse yaitu 1 unit rig tipe Jacro 175 dan 1 unit                 geotechnical drilling, units type of inhouse rig
        rig tipe Jacro 500. Untuk pengeboran geoteknik                         were used, which are 1 unit Jacro 175 and 1
        dengan metode SPT digunakan 1 unit rig tipe Jacro                      unit Jacro 500. For geotechnical drilling using
        200. Seluruh unit rig dioperasikan oleh drilling                       the SPT method, 1 unit Jacro 200 was used.
        operator BIB.                                                          All rig units were operated by BIB drilling
                                                                               operator.
        Seluruh kegiatan pengeboran disupervisi langsung                       All drilling activities are directly supervised by
        oleh Wellsite Geologist, Departemen SGE dan                            the Wellsite Geologist, SGE Department and
        Evaluator Geologist Departemen Strategic, Plan &                       Geologist Evaluator, Strategic, Plan &
        Optimization (SPO), seluruhnya dibawah Divisi Mine                     Optimization (SPO) Department, all under the
        Development & Contract Management (MDC) BIB.                           Mine Development & Contract Management
                                                                               (MDC) Division of BIB.

   2.4. Kemajuan Eksplorasi                                2.4. Exploration Progress
        Kegiatan pengeboran eksplorasi selama periode Q2         Drilling exploration for the period of Q2 2026
        2026 adalah sebagai berikut :                            are as follows :
                   Tabel 1.1. Kemajuan Pengeboran Ekplorasi dan Geoteknik periode Q2 2026/
                       Progress in Exploration and Geotechnical Drilling Period of Q2 2026
                     Lubang Geoteknik (m) /                             Lubang Eksplorasi (m) /
                     Geotech Drilling                                   Exploration Drilling

Lokasi               Jumlah      Total kedalaman (m) /                  Jumlah       Total kedalaman (m) /
Location             lubang      Total Depth                            lubang       Total Depth
                     /                                                  /
                     Total       Drilling           Logging             Total        Drilling                Logging
                     Holes                                              Holes
Girimulya               -                -                  -             55               2.961                  2.802,55
Kusan                   2               70               42,15            4                1.076                  1.056,55




                                             PT. Golden Energy Mines Tbk.
                   Sinar Mas Land Plaza Tower II, 6th Floor Jl. MH. Thamrin No. 51 Kav. 22, Jakarta Pusat 10350
                                       Phone: (62) 21 50186 888 , Fax: (62) 21 3199 0319
                                            Website: www.goldenenergymines.com
Page 4
  2.5. Biaya Eksplorasi                              2.5. Drilling Cost
       Untuk biaya eksplorasi selama periode Q2 2026      The exploration costs for the period of Q2
       adalah sebagai berikut :                           2026 are as follows :

               Tabel 1.2. Biaya Pengeboran Eksplorasi dan Geoteknik RIG Inhouse periode Q2 2026 /
                        Exploration and Geotechnial Drilling Cost for the period of Q2 2026

                                                                        Year to Date
                 Operating Expense
                                                Anggaran / Plan (Rp)           Realisasi / Realisation (Rp)
             Biaya Pengeboran /                Rp. 3.355.381.327,-            Rp. 2.600.084.864,-
             Drilling Cost


3. PT Trisula Kencana Sakti (TKS)
   Tidak ada kegiatan eksplorasi di area TKS pada periode There is no exploration activity in the mine area of
   Q2 2026.                                               TKS for the period of Q2 2026.

4. PT Berkat Satria Abadi (BSA) dan PT Wahana Rimba
   Lestari (WRL)
   Tidak ada kegiatan eksplorasi di area BSA dan WRL pada There is no exploration activity in the mine area of
   periode Q2 2026.                                       BSA and WRL for the period of Q2 2026.

5. PT Barasentosa Lestari (BSL)
   5.1. Daerah Eksplorasi                                                5.1. Daerah Eksplorasi
        Kegiatan pengeboran eksplorasi BSL periode Q2                       Drilling activities of BSL in Q2 2026 was
        2026 dilakukan di area Blok Belani pada area Low                    conducted in the Belani Block area at Low
        Wall Pit. Tipe pengeboran meliputi pengeboran full                  Wall Pit area. The drilling types is full coring
        coring bagian dari Bor Piezometer. Pengeboran                       for Geotech Piezometer drillhole. Geophysical
        pada Q2 tahun 2026 tidak dilengkapi dengan                          logging measurements were not performed
        pengukuran Geofisika Logging.                                       during Q2 2026.

  5.2. Metode Pengeboran                                                 5.2. Drilling Method
       Pelaksanaan pengeboran pada blok Belani                              Drilling activities at Belani Block is carried out
       dilaksanakan dengan memakai sistem grid, dengan                      using a grid system, with 50-100 meter
       jarak antara cross line 50-100 meter dan jarak antar                 distance of cross line and 10-75 meter drill
       lubang bor 10-75 meter, mengikuti jurus dan                          hole spacing, follow the strike and dip of coal
       kemiringan (down dip) pelapisan batuan hingga                        seam with maximum Depth around 60-90
       kedalaman maksimal 60-90 meter. Hal ini bertujuan                    meter. The purpose of grid system and
       untuk memaksimalkan stripping ratio (SR) dan                         control maximum Dept for determine of
       kemenerusan batubara. Rapat nya radius antar titik                   optimization stripping ratio (SR) and
       bor disebabkan adanya indikasi tingkat komplesitas                   continuity of coal. The drillhole spacing is
       geologi yang tinggi pada area pengeboran                             relatively close, because drilling area have
       khususnya adanya struktur geologi patahan dengan                     high complexity geological condition, such as

                                           PT. Golden Energy Mines Tbk.
                  Sinar Mas Land Plaza Tower II, 6th Floor Jl. MH. Thamrin No. 51 Kav. 22, Jakarta Pusat 10350
                                      Phone: (62) 21 50186 888 , Fax: (62) 21 3199 0319
                                           Website: www.goldenenergymines.com
Page 5
    offset (throw) lebih besar dari 20 meter, bidang                      structure geology fault with throw more than
    perlapisan (dip) yang berubah terjal dari 26°                         20 meter. Beside that there are changed dip
    menjadi 88° dan jurus perlapisan (strike) dari N 256                  of coal seam from 26° to be 88 °, strike of coal
    E menjadi N 135 E dan terdapat pola lipatan pada                      seam from N 256 E to be N 135 E and fold
    lapisan batuan yang telah terbuka (exposed).                          major presence at exposed of mining area.

    Pengeboran yang dilakukan yaitu tipe lubang                           Drilling was conducted with open hole, part
    terbuka (open hole) dan part coring. Unit bor yang                    coring and full coring type. The drill unit used
    digunakan adalah rig tipe Jacro-200 dengan                            are rigs type Jacro-200 with 4 inch (diameter
    diameter lubang bor (outside) HQ 4 inch (Ǿ 96 mm).                    96 mm) drill holes (outside) HQ.



5.3. Pelaksanaan dan Pengawasan Kegiatan Eksplorasi                       5.3. Implementation and Supervision of
                                                                               Exploration Activities
    Kegiatan pengeboran BSL periode Q2 2026 pada                          Drilling activities of BSL for the period of Q2
    blok Belani dilakukan oleh tim Eksplorasi dengan 1                    2026 at Block Belani were carried out by the
    unit rig di bawah supervisi Geologist Section                         Exploration team with 1 rig under the
    Geology dan Geotech, Departemen Mine Planning                         supervision of the Geologist Section Geology
    & Technical Service BSL.                                              and Geotech, BSL's Mine Planning & Technical
                                                                          Service Department.
    Kegiatan pengeboran Q2 2026 dilakukan 1 shift                         Drilling activities on Q2 2026 was conducted 1
    yaitu pagi dengan target kedalaman maksimal                           shift (day shift) with depth target per hole is
    meteran per lubang bor sebesar 60-90 meter.                           60-90 meter.
    Unit Rig yang digunakan pada kegiatan pengeboran                      Drilling activity used 1 unit of Jacro-200 with
    adalah tipe Jacro-200 dengan spesifikasi diameter                     an outside (HQ) drill hole diameter of 4 inches
    lubang bor (outside) HQ 4 inch (Ǿ 96 mm). Selain                      (Ǿ 96 mm). In addition to the Jacro rig unit,
    unit Rig Jacro juga terdapat unit Standart                            there is also a Standard Penetration Test
    penetration Tes (SPT) dengan palu. Unit rig jacro-                    (SPT) unit equipped with a hammer. This
    200 ini merupakan unit dengan spesifikasi target                      Jacro-200 rig unit is designed to achieve a
    kedalaman pengeboran coring hingga 90 meter dan                       coring drill depth of up to 90 meters, and due
    ukuran yang cukup besar, sehingga diperlukan unit                     to its relatively large size, heavy equipment
    alat berat (excavator atau Bulldozer) untuk                           (such as an excavator or bulldozer) is required
    melakukan perpindahan unit dari titik bor satu ke                     to move the unit from one drill point to
    titik bor lainnya.                                                    another.
    Lubang bor yang telah selesai dilakukan                               Drill holes that have been finished then
    pengeboran kemudian dilakukan pickup collar                           carried out by a pickup collar survey by the
    survey oleh tim survey BSL yang terdiri dari 1                        BSL survey team consisting of 1 surveyor
    koordinator surveyor dan 2 crew survey.                               coordinator and 2 survey crews.




                                        PT. Golden Energy Mines Tbk.
               Sinar Mas Land Plaza Tower II, 6th Floor Jl. MH. Thamrin No. 51 Kav. 22, Jakarta Pusat 10350
                                   Phone: (62) 21 50186 888 , Fax: (62) 21 3199 0319
                                        Website: www.goldenenergymines.com
Page 6
5.4. Kemajuan Eksplorasi                                                    5.4. Drilling Progress
     Selama periode Q2 2026 kegiatan pengeboran                             In Q2 2026 the exploration activities (full
     geotek full coring (piezometer) menyelesaikan 3                        coring piezometer Geotech) have completed
     lubang bor. Total kedalaman lubang bor selama                          3 bore holes. Total drill hole Depth in Q2 2026
     periode Q2 2026 adalah 136,80 meter rincian pada                       were 136.80 meters as detailed in table 1.3.
     tabel 1.3.                                                             Drilling was carried out using coring drilling
     Pengeboran dilakukan dengan tipe pengeboran                            type to obtain rock samples and determined
     coring dengan tujuan mendapatkan sample geotek                         of lithology for aquifer layer at piezometer
     batuan penentuan litologi sebagai akuifer untuk                        hole .
     titik bor piezometer.




                        Tabel 1.3 Kemajuan Pengeboran Ekplorasi BSL Periode Q2 2026 /
                         BSL Drilling Exploration Progress for the period of Q2 2026

                                                          Lubang Eksplorasi (m) /
                                                             Exploration Drilling

    Lokasi /        Jumlah                               Total kedalaman (m) /
    Location        lubang /                             Total Depth
                                                                                                      Total (m)
                    Total                                Coring               Full Coring
                    Holes           Open Holes
                                                         (Infill)             (Geotech)
Belani              3              3,30                                       133,50                  136,80




5.5. Biaya Eksplorasi                              5.5. Exploration Cost
     Untuk biaya eksplorasi selama periode Q2 2026      The exploration costs for the period of Q2
     adalah sebagai berikut :                           2026 are as follows :

                            Tabel 1.4. Biaya Pengeboran Eksplorasi BSL periode Q2 2026 /
                                      BSL Drilling Cost for the period of Q2 2026

                                                                                Year to Date
               Operating Expense
                                                     Anggaran / Plan (Rp)              Realisasi / Realisation (Rp)
  Biaya Eksplorasi BSL /
                                                    Rp. 797.458.012,-              Rp. 377.436.906,-
  Cost of Exploration BSL



                                          PT. Golden Energy Mines Tbk.
                 Sinar Mas Land Plaza Tower II, 6th Floor Jl. MH. Thamrin No. 51 Kav. 22, Jakarta Pusat 10350
                                     Phone: (62) 21 50186 888 , Fax: (62) 21 3199 0319
                                          Website: www.goldenenergymines.com

File

File Open PDF
Source IDX
Size0.77 MB
Published10 Jul 2026
Pages6
Characters21,533
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 16 people and organisations named in the text · linked when the evidence is strong

linked org Golden Energy Mines Tbk p.1 ×23
linked org Sinar Mas p.1 ×6
linked org PT Borneo Indobara p.2
possible org PT Bursa Efek Indonesia p.1 ×3
unresolved org Indonesia Stock Exchange p.1
unresolved org PT Golden Energy Mines Tbk Sudin p.1
unresolved person Sudin, SH · Corporate Secretary p.1
unresolved org PT Kuansing Inti Makmur p.2
unresolved org Departemen Survey p.2
unresolved org Departemen SGE p.3
unresolved org Departemen Strategic p.3
unresolved org PT Trisula Kencana Sakti p.4
unresolved org PT Berkat Satria Abadi p.4
unresolved org PT Wahana Rimba Lestari p.4
unresolved org PT Barasentosa Lestari p.4
unresolved org Departemen Mine Planning p.5

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

Other files in this announcement 1

↑↓ select ↵ open ⇧↵ see every result