Skip to content
Back to announcement

20250613_BBRM_Public Expose_31894808_lamp1.pdf

Other Text extracted BBRM

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 27

Page 1

          
Page 2
Public Expose Rules
 1. Participants are required to write Participants Name and their institution.
    (example : Budi – Koran Kontan)

 2. For this Public Expose, the raise hand, chat, video and audio functions of all
    participants are disabled.

 3. Questions and suggestions may be submitted through the chat and Q&A
    function, stating your name and institution. Anonymous questions will not be
    answered.

 4. Moderator will select questions and the answers will be given live.

 5. Questions or suggestions can be submitted to email at lapor@bbr.co.id

                                                                                     2
Page 3
   Annual Report dan
  Sustainability Report




Both reports can be accessed on the Company’s website www.bbr.co.id , in the
investor relations section for the Annual Report and the Sustainability section for
                                                                                      3
the Sustainability Report.
Page 4
Agenda

01. COMPANY INFORMATION
      Milestones
      Management Structure
      Business Segment

02. COMPANY PERFORMANCE
      Profit and Loss Statement and Financial Position

03. PROSPECTS INDUSTRY AND MANAJEMENT EFFORTS

04. QUESTION AND ANSWER SESSION
Page 5
COMPANY INFORMATION




                      5
Page 6
Milestones
1998
       Incorporated on February 7th by providing agency services

2005   Implementation of Cabotage principle, The Company started acquiring and operating its
       own fleet of vessel

2011
       Marco Polo Group entered as a shareholder and the Company started its chartering of OSV


2013   Conducting an Initial Public Offering of Shares on January 9, the proceeds to be
       obtained by the Company amount to IDR 138 billion

       Perform Limited Public Offering I With the preemptive right. Total funds obtained BBR is
2014   IDR 368 billion and signed for the purchase of 8 (eight) unit OSV with a total transaction
       value of USD 170 million

2015   The Company continues to be committed to maintaining the quality of its services and its
       concern for the environment by obtaining ISO 9001:2008 and 14001:2004 certifications

                                                                                                    6
Page 7
Milestones                 Rekam Jejak

2020   Completed a bank debt restructuring program and signed the purchase of 2 OSV vessels


       Perform Limited Public Offering II with pre-emptive rights on February 15, 2022, funds
2022   to be obtained by the Company amounting to IDR 245 billion, and signed the purchase
       of 1 unit of OSV vessel




                                                                                                7
Page 8
Board of Commissioner

 LATIP                            KUKUH KOMANDOKO




         Komisaris Utama                     Komisaris Independen
         President Commissioner              Independent Commissioner




                                                                  8
Page 9
Board of Director

 NA’IM MACHZYUMI                  SEAN LEE YUN FENG       LIE LY




             Direktur Utama                    Direktur            Direktur
             President Director                Director            Director




                                                                              9
Page 10
BUSINESS SEGMENT




                   10
Page 11
Offshore Support Vessel Segment

   ✓ 3 vessel Anchor Handling Tug Supply (AHTS)
   ✓ 1 vessel Anchor Handling Tug (AHT)
  The customer base for these vessels, primarily comprises industries involved in
  offshore operations such as oil and gas exploration and production, offshore
  construction, and marine transportation. These vessels are essential for tasks like
  towing and anchoring rigs, supplying offshore platforms with equipment and
  personnel, and providing support during drilling and construction operations.
  Additionally, they may also serve clients in the renewable energy sector, particularly
  in offshore wind farm installations and maintenance.




                                                                                       11
Page 12
Self Propelled Barge Segment

  ✓2 vessel Self Propelled Barge.
   self-propelled barges serve as versatile assets for mining companies, enabling
   efficient transportation, logistical support, and operational flexibility across
   various stages of the mining process.




                                                                                      12
Page 13
COMPANY PERFORMANCE




                      13
Page 14
Profit and Loss per Business Segment




                                       14
Page 15
Profit and Loss Consolidation

                                                                 Dalam US Dolar
                                                         INCREASE / DECREASE
             REVENUE              2024        2023
                                                        AMOUNT            %
 REVENUE
     Self Propelled Barge      1,631,613    1,692,742       (61,129)      -4%
     Offshore Support Vessel   11,799,001   8,852,813     2,946,188       33%
 (LOSS) / GROSS PROFIT         6,500,295    4,665,606     1,834,689       39%
 PROFIT FOR THE YEAR           8,233,506    4,040,076     4,193,430      104%




                                                                                  15
Page 16
Financial Position

                                                                Dalam US Dolar
                                                       INCREASE / DECREASE
            DESCRIPTION     31-Dec-24    31-Dec-23
                                                      AMOUNT              %
  CURRENT ASSET             12,968,871   10,254,300      2,714,571            26%
  NON CURRENT ASSET         30,293,798   24,531,995      5,761,803            23%
  TOTAL ASSET               43,262,669   34,786,295      8,476,374            24%

  CURRENT LIABILITIES        1,925,626    4,101,734     (2,176,108)         -53%
  NON CURRENT LIABILITIES    3,337,880      920,805      2,417,075          262%
  TOTAL LIABILITIES          5,263,506    5,022,539        240,967            5%

  EQUITY                    37,999,163   29,763,756      8,235,407           28%


                                                                               16
Page 17
PROSPECTS INDUSTRY AND MANAGEMENT EFFORTS




                                       17
Page 18
Prospects Industry in 2025

 DIVISI OFFSHORE SUPPORT VESSEL

 The national shipping sector continues to grow during 2024 and is expected to continue in
 2025. This optimism is supported by bright prospects in the offshore segment in line with the
 increase in national and international oil production. The decision of the Ministry of Energy
 and Mineral Resources to optimize national oil production and the SKK Migas lifting target of
 1.61 million barrels of oil equivalent per day (BOEPD) in 2025 will drive demand for offshore
 support vessels (OSVs). In addition, according to the Internationa Energy Agency (IEA), world
 crude oil demand in 2025 is projected to increase by 1.1 million barrels per day to 103.9
 million barrels per day.

 This will potentially open up greater opportunities for fleet needs from customers and of
 course will have a positive impact on the Company's business which is engaged in shipping
                                                                                            18
 services that focus on supporting upstream oil and gas activities.
Page 19
Prospects Industry in 2025

DIVISI SELF PROPELLED BARGE

Despite having to face regulatory challenges that increasingly emphasize renewable energy,
the cargo transportation sector, such as coal and nickel, still has great business prospects for
shipping industry players. Coal is still the main foundation in Indonesia's energy mix, especially
to meet domestic electricity needs. The Ministry of Energy and Mineral Resources (ESDM)
stated that the target for domestic coal supply obligations or Domestic Market Obligation
(DMO) in 2025 will be greater than in 2024. The need for coal in Indonesia in 2025 is
estimated to reach 239.7 million tons.

In meeting electricity needs, 67% of power plants in Indonesia still use coal as fuel.




                                                                                                 19
Page 20
Management Efforts in 2025

 In 2025, the offshore shipping and SPB industry will likely face a number of new
 challenges related to technology, environmental sustainability, increasingly stringent
 regulations, and global market dynamics. To remain competitive and ensure business
 continuity, the Company's Management needs to consider several strategic efforts,
 including:


 1. Adoption of Advanced Technology: Adopting automation technology to reduce
 operational costs and increase efficiency. The use of artificial intelligence (AI) for
 maintenance prediction, shipping route optimization and more effective fleet
 management can help the Company reduce costs and increase reliability.


                                                                                          20
Page 21
Management Efforts in 2025

 2. Focus on Sustainable Operations: Prioritize environmental sustainability and

 comply with regulations governing ship emissions, waste management and
 ecological conservation. Invest in environmentally friendly technologies such as
 hybrid propulsion systems, exhaust gas cleaning systems and ballast water treatment
 systems to minimize the environmental impact of the fleet. Demonstrate the
 Company's commitment to sustainability to encourage customers to be
 environmentally conscious and enhance the company's reputation.




                                                                                       21
Page 22
Management Efforts in 2025

 3. Customer Relationship Management: Strengthen relationships with existing

 customers and foster new partnerships by providing superior, reliable, and
 responsive service. Serve customers’ needs and proactively meet their evolving
 needs. Receive customer feedback to identify areas for improvement and seek
 opportunities for innovation




                                                                                  22
Page 23
Management Efforts in 2025

 4. Investment in Training and Development : Develop a skilled and competent
 workforce capable of operating and maintaining the fleet efficiently and safely.
 Invest in training programs, certifications, and continuous professional development
 opportunities for crew members and shore-based staff. Foster a culture of safety,
 teamwork, and innovation to ensure high-performance operations and customer
 satisfaction.




                                                                                        23
Page 24
Management Efforts in 2025

 5. Market Diversification : Explore opportunities to diversify the company's client
 base and geographic presence. Expand operations into new markets such as offshore
 wind energy, marine construction, marine cable installations and offshore wind farm
 installations.

 By implementing these long-term strategies, The Company is expected to grow
 sustainably, competitiveness, and success in the maritime industry.




                                                                                       24
Page 25
                                    Disclaimer

QUESTION AND ANSWER
SECTION

                                                 Thank You
PT Pelayaran Nasional Bina Buana Raya Tbk
TCC Batavia Tower One 8th Floor, Suite 08-09
Jalan KH. Mas Mansyur Kav. 126
Jakarta 10220
Phone: +62-21 29529461
Website: www.bbr.co.id                                   25
Page 26
Customer




           26
Page 27
Disclaimer                          Disclaimer
The information in this presentation is general information about PT Pelayaran Nasional Bina Buana Raya Tbk
(“Company”) prepared by the Company for public exposure. The information contained in this presentation has
not been independently verified and none of the Board of Commissioners, Directors, employees, affiliates or
agents of the Company provide any representation or warranty either expressly or impliedly regarding the
accuracy, appropriateness, completeness or truth of the information and conclusions contained in this
presentation. Therefore, the accuracy, appropriateness, completeness or truth of this presentation cannot be
used as a reference, nor can any conclusions be drawn from this presentation that has been prepared and
presented. In addition, no party is authorized to provide information on matters that are not contained in the
presentation and/or inconsistent with this presentation.

The Company is not obligated to correct, update the information in this presentation. The opinions expressed in
this presentation are subject to change without notice. To the maximum extent permitted by law, the Company,
or any Director, employee, affiliate or agent of the Company shall not be liable whatsoever, for any damages
whatsoever arising from or in connection with the use of this presentation or arising from anything expressly or
implicitly contained or referred to in this presentation.

This presentation has been prepared for information purposes only and is not to be
distributed/disseminated/reproduced in any form to any third party without the prior written consent of the
Company.
                                                                                                              27

File

File Open PDF
Source IDX
Size0.9 MB
Published13 Jun 2025
Pages27
Characters13,505
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 6 people and organisations named in the text · linked when the evidence is strong

linked org Marco Polo p.6
linked person KUKUH KOMANDOKO p.8
linked person SEAN LEE YUN FENG p.9
unresolved org Ministry of Energy and Mineral Resources p.18 ×2
unresolved person KH. Mas Mansyur p.25

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result