Skip to content
Back to announcement

20260703_CUAN_Laporan Bulanan Aktivitas Eksplorasi_32108192.pdf

Other Text extracted CUAN

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 4

Page 1
Go To English Page

 Nomor Surat                           620/PJK/FIN/VII/2026

 Nama Perusahaan                       PT Petrindo Jaya Kreasi Tbk

 Kode Emiten                           CUAN

 Lampiran                              0

 Perihal                               Laporan Bulanan Aktivitas Eksplorasi

Perseroan melaporkan aktivitas eksplorasi untuk JUL 2026 Sebagai Berikut :

                                                                                         Hasil aktivitas
      Nama              Area yang
                                     Total biaya yang    Pihak yang       Metode          eksplorasi
   Perusahaan/          dilakukan                                                                        Rencana tindak
                                           telah         melakukan     pengujian dan     hingga akhir
      Anak               aktivitas                                                                           lanjut
                                       dikeluarkan       eksplorasi    pemilihan area       periode
   perusahaan           eksplorasi
                                                                                         pelaporan ini
    PT. INTAM          Kecamatan 17.737.096.500    1. Mapping        1.Pemetaan         1. Dijumpai      1. Melanjutkan
                        Lantung,                geologi dan parit       geology            batuan        Trenching dan
                     Lenangguar dan             uji dilaksanakan permukaan dan limestone yang               pemetaan
                        Ropang,                     oleh team     Pembuatan Parit        teralterasi        lapangan.
                       Kabupaten                  geologist PT. Uji. Pemetaan sedang - hingga 2. Melanjutkan
                       Sumbawa,                        Intam.     geologi dilakkan kuat dan terlihat pengeboran
                      Propinsi Nusa              2. Pengeboran           dengan       termineralisasi. dengan spasi
                     Tenggara Barat               Inti dilakukan      mengamati        2. didapatkan antar line 50 m
                                                 oleh kontraktor         batuan        kemenerusan        dengan total
                                                   PT. GIS dan       disepanjang        Quartz vein            meter
                                                   PT. Armindo       sungai, alur        (vein Alfa,       kedalaman
                                                     3. Studi         sungai dan       Bravo, Carlie      pengeboran
                                                  Geolistrik (IP)     perbukitan.        dan Delta)          7.000 m.
                                                      tahap 2       Batuan yang         dengan total Tujuannya untuk
                                                  dilaksanakan         terindikasi    panjang 450 m. meningkatkan
                                                     oleh PT.     adanya cebakan 3. Berdasarkan               tingkat
                                                    Geostrom       emas dilakukan pengambilan               keyakinan
                                                                        parit uji.     data resistivity estimasi mineral
                                                                   2. Pengeboran             dan         (emas) diarea
                                                                      Inti dengan      chargeability,        prospek
                                                                   spasi antar line       beberapa         sedangkan
                                                                   100 m didalam           tempat         pengeboran
                                                                    area prospek         terindikasi      awal dengan
                                                                  dan pengeboran adanya cebakan total 6.000 m di
                                                                          awal          batuan yang       area prospek
                                                                     berdasarkan termineralisasi lainnya untuk
                                                                       hasil studi                        memastikan
                                                                    Geolistrik (IP)                      hasil dari studi
                                                                   diarea prospek                           geolistrik.
                                                                  lainnya.         3.
                                                                   Geolistrik tahap
                                                                       2 (19 line)
                                                                     dengan total
                                                                        32,2 km.
                                                                    Pengambilan
                                                                    data geolistrik
                                                                      (IP) batuan
                                                                     berdasarkan
                                                                       hasul dari
                                                                  mapping geologi
                                                                     permukaan.

 Demikian untuk diketahui.


 Hormat Kami,
Page 2
PT Petrindo Jaya Kreasi Tbk




Michael

Direktur Utama




PT Petrindo Jaya Kreasi Tbk
Gedung Wisma Barito Pacific, lantai 3 B
Telepon : (021) 5308520, Fax : (021) 5355678, www.petrindo.co.id



Nama Pengirim                      Michael

Jabatan                            Direktur Utama
Tanggal dan Waktu                  03-07-2026 16:10




Dokumen ini merupakan dokumen resmi PT Petrindo Jaya Kreasi Tbk yang tidak memerlukan tanda tangan karena
  dihasilkan secara elektronik oleh sistem pelaporan elektronik. PT Petrindo Jaya Kreasi Tbk bertanggung jawab
                              penuh atas informasi yang tertera didalam dokumen ini.
Page 3
Go To Indonesian Page

 Letter / Announcement No.            620/PJK/FIN/VII/2026

 Issuer Name                          PT Petrindo Jaya Kreasi Tbk

 Issuer Code                          CUAN

 Attachment                           0

 Subject                              Monthly Exploration Activities Report

The Company reports exploration activities for JUL 2026 as follows :

 Company name/ Exploration                Total cost      Parties     Testing methods    Results of     Follow up plan
   Subsidiary  activities area             incurred     exploration    and selection     exploration
                                                                            area       activities until
                                                                                       the end of the
                                                                                      reporting period

    PT. INTAM         Kecamatan 17,737,096,500    1. Mapping        1.Pemetaan         1. Dijumpai      1. Melanjutkan
                       Lantung,                geologi dan parit       geology            batuan        Trenching dan
                    Lenangguar dan             uji dilaksanakan permukaan dan limestone yang               pemetaan
                       Ropang,                     oleh team     Pembuatan Parit        teralterasi        lapangan.
                      Kabupaten                  geologist PT. Uji. Pemetaan sedang - hingga 2. Melanjutkan
                      Sumbawa,                        Intam.     geologi dilakkan kuat dan terlihat pengeboran
                     Propinsi Nusa              2. Pengeboran           dengan       termineralisasi. dengan spasi
                    Tenggara Barat               Inti dilakukan      mengamati        2. didapatkan antar line 50 m
                                                oleh kontraktor         batuan        kemenerusan        dengan total
                                                  PT. GIS dan       disepanjang        Quartz vein            meter
                                                  PT. Armindo       sungai, alur        (vein Alfa,       kedalaman
                                                    3. Studi         sungai dan       Bravo, Carlie      pengeboran
                                                 Geolistrik (IP)     perbukitan.        dan Delta)          7.000 m.
                                                     tahap 2       Batuan yang         dengan total Tujuannya untuk
                                                 dilaksanakan         terindikasi    panjang 450 m. meningkatkan
                                                    oleh PT.     adanya cebakan 3. Berdasarkan               tingkat
                                                   Geostrom       emas dilakukan pengambilan               keyakinan
                                                                       parit uji.     data resistivity estimasi mineral
                                                                  2. Pengeboran             dan         (emas) diarea
                                                                     Inti dengan      chargeability,        prospek
                                                                  spasi antar line       beberapa         sedangkan
                                                                  100 m didalam           tempat         pengeboran
                                                                   area prospek         terindikasi      awal dengan
                                                                 dan pengeboran adanya cebakan total 6.000 m di
                                                                         awal          batuan yang       area prospek
                                                                    berdasarkan termineralisasi lainnya untuk
                                                                      hasil studi                        memastikan
                                                                   Geolistrik (IP)                      hasil dari studi
                                                                  diarea prospek                           geolistrik.
                                                                 lainnya.         3.
                                                                  Geolistrik tahap
                                                                      2 (19 line)
                                                                    dengan total
                                                                       32,2 km.
                                                                   Pengambilan
                                                                   data geolistrik
                                                                     (IP) batuan
                                                                    berdasarkan
                                                                      hasul dari
                                                                 mapping geologi
                                                                    permukaan.

 Thus to be informed accordingly.
Page 4
Respectfully,
PT Petrindo Jaya Kreasi Tbk




Michael

Direktur Utama




PT Petrindo Jaya Kreasi Tbk
Gedung Wisma Barito Pacific, lantai 3 B
Phone : (021) 5308520, Fax : (021) 5355678, www.petrindo.co.id



Sender Name                          Michael

Function                             Direktur Utama

Date and Time                        03-07-2026 16:10




  This is an official document of PT Petrindo Jaya Kreasi Tbk that does not require a signature as it was generated
 electronically by the electronic reporting system. PT Petrindo Jaya Kreasi Tbk is fully responsible for the information
                                             contained within this document.

File

File Open PDF
Source IDX
Size0.01 MB
Published3 Jul 2026
Pages4
Characters12,250
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 11 people and organisations named in the text · linked when the evidence is strong

linked org Petrindo Jaya Kreasi Tbk · Nama Perusahaan p.1 ×30
possible — Michael · Direktur Utama p.2 ×2
unresolved org PT. INTAM p.1 ×2
unresolved org Kabupaten p.1
unresolved org PT. Uji. Pemetaan p.1 ×2
unresolved org PT. GIS p.1 ×2
unresolved org PT. Armindo p.1 ×2
unresolved — parit uji. p.1
unresolved — Geolistrik (IP) p.1
unresolved — diarea prospek p.1
unresolved person Function · Direktur Utama p.4

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result