Skip to content
Back to announcement

20250430_BRAM_Laporan Informasi dan Fakta Material_31879585_lamp3.pdf

Other Text extracted BRAM

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 1

Page 1
                                 PENGUMUMAN
                        PT INDO KORDSA TBK (“Perseroan”)
        TENTANG PEMULIHAN OPERASIONAL PASCA BANJIR DI PABRIK PERSEROAN

             ANNOUNCEMENT OF PT INDO KORDSA TBK (the “Company”)
     REGARDING OPERATIONAL RECOVERY POST-FLOOD AT THE COMPANY’S FACTORY

Sebagaimana telah kami informasikan sebelumnya,           As previously stated, The Company’s production
bahwa fasilitas produksi Perseroan terdampak oleh         facilities have been affected by the flood disaster
bencana banjir yang terjadi di Bogor, Indonesia, pada     occurred in Bogor, Indonesia on 4 March 2025.
tanggal 4 Maret 2025. Seluruh kegiatan pembersihan        Our cleanup operations after the flooding disaster
pascabanjir telah diselesaikan. Berdasarkan hasil         have been completed. Damage assessment efforts
penilaian kerusakan, menunjukkan bahwa fasilitas          revealed that the auxiliary facilities supplying
penunjang yang memasok energi ke area porduksi            energy to our production facilities were
terdampak      cukup     signifikan.    Kondisi    ini    significantly affected. This has caused disruptions
menyebabkan gangguan pada pasokan energi ke               in supplying energy to our factory and delays in
pabrik serta keterlambatan dalam proses evaluasi          the damage assessment efforts.
kerusakan secara menyeluruh.

Sebagai bagian dari upaya pemulihan operasional,          As part of our efforts to restart the operations,
produksi kain telah mulai berjalan kembali dengan         following the activation of the auxiliary facilities
memanfaatkan persediaan benang yang tersedia,             supplying energy, our fabric production partially
seiring dengan     pengaktifan kembali        fasilitas   continues with the use of existing yarn supplies.
penunjang energi. Fasilitas produksi benang               Our Polyester yarn facility is expected to gradually
Polyester direncanakan akan beroperasi secara             start operations in May and Nylon yarn facility in
bertahap mulai bulan Mei, sedangkan fasilitas benang      June. Assessments regarding the damage from
Nylon ditargetkan menyusul pada bulan Juni. Proses        the flood disaster are ongoing with the insurance
penilaian kerusakan akibat bencana banjir ini masih       company.
berlangsung dan sedang dilakukan bersama pihak
perusahaan asuransi.




                            Citeureup – Kab. Bogor, 30 April 2025
                                      Direksi Perseroan

File

File Open PDF
Source IDX
Size0.1 MB
Published30 Apr 2025
Pages1
Characters2,511
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 1 people and organisations named in the text · linked when the evidence is strong

linked org INDO KORDSA TBK p.1 ×5

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result