Back to announcement
20260904_TGRA_Laporan Informasi dan Fakta Material_32145241_lamp1.pdf
Financial statement Text extracted TGRASource file signed link, expires in 15 minutes
Extracted text 103
Page 1
PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK/
AND ITS SUBSIDIARIES
LAPORAN KEUANGAN
KONSOLIDASIAN 31 Desember 2025
Dengan Angka Perbandingan Tahun 2024
Dan LAPORAN AUDITOR INDEPENDEN/
CONSOLIDATED FINANCIAL
STATEMENTS December 31, 2025
With Comparative Figures For 2024
And INDEPENDENT AUDITOR’S REPORT
Page 2
Page 3
PT TERREGRA ASIA ENERGY Tbk DAN ENTITAS ANAK/
PT TERREGRA ASIA ENERGY Tbk AND ITS SUBSIDIARIES
DAFTAR ISI/TABLE OF CONTENTS
Halaman/
Pages
Laporan Auditor Independen/Independent Auditors’ Report ………….………………......................... i - viii
Laporan Posisi Keuangan Konsolidasian/Consoldiated Statements of Financial Position ………………… 1-2
Laporan Laba Rugi dan Penghasilan Komprehensif Lain Konsolidasian/Consolidated Statements of
Profit or Loss and Other Comprehensive Income …….………………………............................................... 3-4
Laporan Perubahan Ekuitas Konsolidasian/Consolidated Statements of Changes in Equity ……………... 5
Laporan Arus Kas Konsolidasian/Consolidated Statements of Cash Flows …….………………................. 6
Catatan atas Laporan Keuangan Konsolidasian/Consolidated Notes to Financial Statements ............. 7 - 87
Lampiran: Laporan Keuangan Entitas Induk Tersendiri
Laporan Posisi Keuangan Entitas Induk Tersendiri/Parent Company Only Statements of Financial
Position ………………………………………………………………………………………………………………. i - ii
Laporan Laba Rugi dan Penghasilan Komprehensif Lain Entitas Induk Tersendiri/Parent Company Only
Statements of Profit or Loss and Other Comprehensive Income ………………………………………………. iii
Laporan Perubahan Ekuitas Entitas Induk Tersendiri/Parent Company Only Statements of Changes in
Equity ……………………………………………….……………………………………………….………………… iv
Laporan Arus Kas Entitas Induk Tersendiri/Parent Company Only Statements of Cash Flow.……………… v
Page 4
Laporan Auditor Independen Independent Auditors' Report
Laporan/Report No. 00190/2.1448/AU.1/05/1961-2/1/IX/2026
Pemegang Saham, Komisaris dan Direksi The Stockholders, Commissioner and Director
PT Terregra Asia Energy Tbk dan Entitas PT Terregra Asia Energy Tbk and Its
Anak Subsidiaries
Opini Opinion
Kami telah mengaudit laporan keuangan We have audited the consolidated financial
konsolidasian PT Terregra Asia Energy Tbk dan statements of PT Terregra Asia Energy Tbk and Its
Entitas Anak (Grup), yang terdiri dari laporan Subsidiaries (the Group), which comprise the
posisi keuangan konsolidasian tanggal consolidated statement of financial position as of
31 Desember 2025, serta laporan laba rugi dan December 31, 2025, and the consolidated
penghasilan komprehensif lain konsolidasian, statement of profit or loss and other
laporan perubahan ekuitas konsolidasian, dan comprehensive income, consolidated statement of
laporan arus kas konsolidasian untuk tahun yang changes in equity and consolidated statement of
berakhir pada tanggal tersebut, serta catatan cash flows for year ended, and notes to the
atas laporan keuangan konsolidasian, termasuk consolidated financial statements, including a
ikhtisar kebijakan akuntansi signifikan. summary of significant accounting policies.
Menurut opini kami, laporan keuangan In our opinion, the accompanying financial
konsolidasian terlampir menyajikan secara wajar, statements present fairly, in all material respects,
dalam semua hal yang material, posisi keuangan the consolidated financial position of the Company
konsolidasian Grup tanggal 31 Desember 2025, as of December 31, 2025 and its consolidated
serta kinerja keuangan konsolidasian dan arus financial performance and consolidated cash flows
kas konsolidasiannya untuk tahun yang berakhir for the year ended in accordance with Indonesian
pada tanggal tersebut, sesuai dengan Standar Financial Accounting Standards.
Akuntansi Keuangan di Indonesia.
Basis Opini Basis for Opinion
Kami melaksanakan audit kami berdasarkan We conducted our audit in accordance with
Standar Audit yang ditetapkan oleh Institut Standards on Auditing established by the
Akuntan Publik Indonesia. Tanggung jawab kami Indonesian Institute of Certified Public
menurut standar tersebut diuraikan lebih lanjut Accountants. Our responsibilities under those
dalam paragraf Tanggung Jawab Auditor standards are further described in the Auditor’s
terhadap Audit atas Laporan Keuangan Responsibilities for the Audit of the Consolidated
Konsolidasian pada laporan kami. Kami Financial Statements section of our report. We are
independen terhadap Grup berdasarkan independent of the Group in accordance with the
ketentuan etika yang relevan dalam audit kami ethical requirements that are relevant to our audit
atas laporan keuangan konsolidasian di of the consolidated financial statements in
Indonesia, dan kami telah memenuhi tanggung Indonesia, and we have fulfilled our other ethical
jawab etika lainnya berdasarkan ketentuan responsibilities in accordance with these
tersebut. Kami yakin bahwa bukti audit yang requirements. We believe that the audit evidence
telah kami peroleh adalah cukup dan tepat untuk we have obtained is sufficient and appropriate to
menyediakan suatu basis bagi opini audit kami. provide a basis for our opinion.
i
Page 5
Laporan Auditor Independen (Lanjutan) Independent Auditors' Report (Continued)
Laporan/Report No. 00190/2.1448/AU.1/05/1961-2/1/IX/2026
Hal Audit Utama Key Audit Matters
Hal audit utama adalah hal-hal yang menurut Key audit matters are matters that , in our
pertimbangan profesional kami merupakan hal- professional judgement, were of most significance
hal yang paling signifikan dalam audit kami atas in our audit of the consolidated financial
laporan keuangan konsolidasian periode kini. statements of the current period. These matters
Hal-hal tersebut disampaikan dalam konteks were addressed in the context of our audit of the
audit kami atas laporan keuangan secara consolidated financial statements as a whole, and
keseluruhan, dan dalam merumuskan opini kami in forming our opinion thereon, we do not provide
atas laporan keuangan konsolidasian terkait, a separate opinion on these matters.
kami tidak menyatakan suatu opini terpisah atas
hal audit utama tersebut.
Hal audit utama yang terindentifikasi dalam audit The key audit matters identified in our audit is
kami diuraikan sebagai berikut: outlined below:
Aset dalam pembangunan Assets under construction
Seperti yang dijelaskan pada Catatan 10 atas As explained in Note 10 to the consolidated
laporan keuangan konsolidasian, Grup memiliki financial statements, the Group has assets under
aset dalam pembangunan dengan nilai tercatat construction with a carrying amount on December
pada tanggal 31 Desember 2025 sebesar 31, 2025 of Rp 177,704,743,864 or 86.07% of the
Rp 177.704.743.864 atau 86,07% dari total aset Group's total assets on that date. These assets
Grup pada tanggal tersebut. Aset ini terdiri dari consist of land, buildings, and capitalized costs.
tanah, bangunan, dan kapitalisasi biaya.
Pengadaan aset dalam pembangunan tersebut The procurement of construction-in-progress
sehubungan dengan pelaksanaan assets is in connection with the construction of the
pembangunan proyek-proyek pembangkit listrik Group's mini hydro power ("PLTMH") and
tenaga mini hidro (“PLTMH”) dan pembangkit hydroelectric power ("PLTA") projects which are
listrik tenaga air (“PLTA”) Grup yang berlokasi di located in several areas with a hydroelectric
beberapa daerah dengan kapasitas energi listrik energy capacity of up to 510.8 Megawatts. 5 (five)
tenaga air mencapai 510,8 Megawatt. 5 (lima) PLTMH already have Power Purchase
PLTMH telah memiliki Perjanjian Jual Beli Listrik Agreements with third parties and 2 (two) PLTAs
dengan pihak ketiga dan 2 (dua) PLTA telah have obtained Principle Permits and Location
mendapatkan Ijin Prinsip dan Ijin Lokasi. Permits.
Pembangunan PLTMH dan PLTA membutuhkan The construction of PLTMH and PLTA requires a
biaya yang cukup besar. Rencana pembiayaan large amount of money. The financing plan for
PLTMH dan PLTA, selain dari modal sendiri, juga PLTMH and PLTA, apart from own capital, is also
diusahakan dari pihak ketiga. Sampai dengan sought from third parties. As of December 31,
tanggal 31 Desember 2025, Grup masih dalam 2025, the Group is still in the process of obtaining
usaha memperoleh sumber pembiayaan dari financing from third parties, both in the form of
pihak ketiga baik dalam bentuk pinjaman loans and investments.
maupun investasi.
ii
Page 6
Apabila pembangunan PLTMH dan PLTA tidak If the construction of PLTMH and PLTA is not
diteruskan atau dihentikan, sebagian aset dalam continued or stopped, some of the assets under
pembangunan yang berasal dari kapitalisasi construction originating from capitalized costs will
biaya akan menjadi kerugian investasi dan nilai become investment losses, and the value of these
kerugian ini signifikan. Pada tahun 2025 aset losses is significant. In 2025, fixed assets asset in
tetap dalam pembangunan mengalami progress incurred an impairment loss of
penurunan nilai berdasarkan evaluasi dan Rp 181,235,058,535 (Note 10), based on the
penilaian dari manajemen Grup sebesar Group management's evaluation and assessment,
Rp 181.235.058.535 (Cacatan 10) yang which was charged to the consolidated statement
dibebankan pada laporan laba rugi dan of profit or loss and other comprehensive income
komprehensif lain konsolidasian untuk tahun for the year ended December 31, 2025.
yang berakhir pada 31 Desember 2025.
Prosedur audit kami mencakup, antara lain: Our audit procedures include, among others:
- Pemeriksaan fisik aset dan bukti-bukti - Physical examination of assets and supporting
pendukung atas transaksi perolehan dan evidence of acquisition transactions and
bukti-bukti kepemilikan aset dalam evidence of ownership of assets under
pembangunan; construction;
- Pemahaman terhadap semua klausul - Understanding of all agreement clauses related
perjanjian terkait dengan PLTMH dan PLTA to PLTMH and PLTA, both agreements related
baik perjanjian terkait dengan pembiayaan to financing and those related to prospective
maupun terkait dengan pihak calon pembeli buyers of electrical energy from the PLTMH and
energi listrik hasil dari PLTMH dan PLTA PLTA.
tersebut.
- Memahami dan mengevaluasi proses - Understand and evaluate the valuation process
penilaian terhadap penurunan nilai aset for the impairment of assets under construction
dalam pembangunan pada tahun berjalan. during the current year.
- Menilai kecukupan pengungkapan yang - Assess the adequacy of the disclosures
disajikan dalam catatan atas laporan presented in the notes to the financial
keuangan sesuai dengan Standar Akuntansi statements in accordance with the applicable
Keuangan yang berlaku di Indonesia. Financial Accounting Standards in Indonesia.
Ketidakpastian Material yang Terkait dengan Material Uncertainty Related to Going Concern
Kelangsungan Usaha
Sebagaimana yang diungkapkan dalam As disclosed in Note 31 to the accompanying
Catatan 31 atas laporan keuangan konsolidasian consolidated financial statements, the Group
terlampir, Grup mencatat rugi bersih untuk tahun recorded a net loss for the year ended December
yang berakhir pada tanggal 31 Desember 2025 31, 2025 amounting to Rp 259,517,560,260, and
sebesar Rp 259.517.560.260, serta melaporkan reported a deficit balance on December 31, 2025
saldo defisit pada tanggal 31 Desember 2025 amounting to Rp 272,407,947,388. In addition, in
sebesar Rp 272.407.947.388. Selain itu, pada 2025 the Group did not earn any revenue and the
tahun 2025 Grup tidak memperoleh pendapatan amount of its current liabilities as of December 31,
serta jumlah liabilitas lancarnya pada tanggal 2025 has exceeded the amount of its current
31 Desember 2025 telah melampaui jumlah aset assets by Rp 150,403,183,483. These conditions,
lancarnya sebesar Rp 150.403.183.483. Kondisi along with other matters disclosed in Note 31 to the
tersebut, beserta hal-hal lainnya yang accompanying consolidated financial statements,
diungkapkan dalam Catatan 31 atas laporan indicate the existence of a material that may cause
keuangan konsolidasian terlampir, significant doubt about the Group's ability to
mengindikasikan adanya suatu ketidakpastian continue as a going concern. Our opinion is
material yang dapat menyebabkan keraguan unmodified.
signifikan atas kemampuan Grup untuk
mempertahankan kelangsungan usahanya.
Opini kami tidak dimodifikasi sehubungan
dengan hal tersebut.
iii
Page 7
Hal Lain Other Matter
Audit kami atas laporan keuangan konsolidasian Our audit of the accompanying consolidated
PT Terregra Asia Energy Tbk dan Entitas financial statements of PT Terregra Asia Energy
Anaknya tanggal 31 Desember 2025 dan untuk Tbk and its Subsidiaries as of December 31, 2025,
tahun yang berakhir pada tanggal tersebut and for the year then ended, was performed for the
terlampir dilaksanakan dengan tujuan untuk purpose of forming an opinion on such
merumuskan suatu opini atas laporan keuangan consolidated financial statements taken as a
konsolidasian tersebut secara keseluruhan. whole.The accompanying financial information of
lnformasi keuangan PT Terregra Asia Energy PT Terregra Asia Energy Tbk (Parent Entity),
Tbk (Entitas lnduk) terlampir, yang terdiri dari which comprises the statement of financial position
laporan posisi keuangan tanggal 31 Desember as of December 31 , 2025, and the statement of
2025, serta laporan laba rugi dan penghasilan profit or loss and other comprehensive income,
komprehensif lain, laporan perubahan ekuitas statement of changes in equity and statement of
dan laporan arus kas untuk tahun yang berakhir cash flows for the year then ended, and other
pada tanggal tersebut, dan informasi penjelasan supplementary information (collectively referred to
lainnya (secara kolektif disebut sebagai as the "Parent Entity Financial lnformation'), which
"lnformasi Keuangan Entitas lnduk"), yang is presented as a supplementary information to the
disajikan sebagai laporan informasi tambahan accompanying consolidated financial statements,
terhadap laporan keuangan konsolidasian is presented for the purpose of additional analysis
terlampir, disajikan untuk tujuan analisis and is not a required part of the accompanying
tambahan dan bukan merupakan bagian dari consolidated financial statements under
laporan keuangan konsolidasian tertampir yang lndonesian Financial Accounting Standards. The
diharuskan menurut Standar Akuntasi Keuangan Parent Entity Financial lnformation is the
di lndonesia. lnformasi Keuangan Entitas lnduk responsibility of management and was derived
merupakan tanggung jawab manajemen serta from and relates directly to the underlying
dihasilkan dari dan berkaitan secara langsung accounting and other records used to prepare the
dengan catatan akuntasi dan catatan lainnya accompanying consolidated financial statements
yang mendasarinya yang digunakan untuk The Parent Entity Financial lnformation has been
menyusun laporan keuangan konsolidasian subjected to the auditing procedures applied in the
terlampir. lnformasi Keuangan Entitas lnduk telah audit of the accompanying consolidated financial
menjadi objek prosedur audit yang diterapkan statements in accordance with Standards on
dalam audit atas laporan keuangan Auditing established by the lndonesian lnstitute of
konsolidasian terlampir berdasarkan Standar Certified Public Accountants. ln our opinion, the
Audit yang ditetapkan oleh lnstitut Akuntan Publik Parent Entity Financial lnformation is fairly stated,
lndonesia. Menurut opini kami, informasi in all material respects, in relation to the
Keuangan Entitas lnduk disajikan secara wajar, accompanying consolidated financial statements
dalam semua hal yang material, berkaitan taken as a whole.
dengan laporan keuangan konsolidasian
terlampir secara keseluruhan.
Informasi Lain Other Information
Manajemen bertanggung jawab atas informasi Management is responsible for the other
lain. Informasi lain terdiri dari informasi yang information. The other information comprises the
tercantum dalam laporan tahunan, tetapi tidak information included in the annual report but does
termasuk laporan keuangan konsolidasian dan not include the consolidated financial statements
laporan auditor kami. Laporan tahunan and our auditors' report thereon. The annual report
diharapkan akan tersedia bagi kami setelah is expected to be made available to us after the
tanggal laporan auditor ini. date of this auditors' report.
Opini kami atas laporan keuangan konsolidasian Our opinion on the consolidated financial
tidak mencakup informasi lain, dan oleh karena statements does not cover the other information
itu, kami tidak menyatakan bentuk keyakinan and we will not express any form of assurance
apapun atas informasi lain tersebut. conclusion thereon.
iv
Page 8
Sehubungan dengan audit kami atas laporan In connection with our audit of the consolidated
keuangan konsolidasian, tanggung jawab kami financial statements, our responsibility is to read
adalah untuk membaca informasi lain yang the other information identified above when it
teridentifikasi di atas, jika tersedia dan, dalam becomes available and, in doing so, consider
melaksanakannya, mempertimbangkan apakah whether the other information is materially
informasi lain mengandung ketidakkonsistensian inconsistent with the consolidated financial
material dengan laporan keuangan statements or our knowledge obtained in the audit,
konsolidasian atau pemahaman yang kami or otherwise appears to be materially misstated.
peroleh selama audit, atau mengandung
kesalahan penyajian material.
Ketika kami membaca laporan tahunan, jika kami When we read the annual report, if we conclude
menyimpulkan bahwa terdapat suatu kesalahan that there is a material misstatement therein, we
penyajian material di dalamnya, kami diharuskan are required to communicate the matter to those
untuk mengomunikasikan hal tersebut kepada charged with governance and take appropriate
pihak yang bertanggung jawab atas tata kelola actions in accordance with Standards on Auditing
dan mengambil tindakan tepat berdasarkan established by the Indonesian Institute of Certified
Standar Audit yang ditetapkan oleh Institut Public Accountants.
Akuntan Publik Indonesia.
Tanggung Jawab Manajemen dan Pihak yang Responsibilities of Management and Those
Bertanggung Jawab atas Tata Kelola Charged with Governance for the Consolidated
terhadap Laporan Keuangan Konsolidasian Financial Statements
Manajemen bertanggung jawab atas Management is responsible for the preparation
penyusunan dan penyajian wajar laporan and fair presentation of the consolidated financial
keuangan konsolidasian tersebut sesuai dengan statements in accordance with Indonesian
Standar Akuntansi Keuangan di Indonesia, dan Financial Accounting Standards, and for such
atas pengendalian internal yang dianggap perlu internal control as management determines is
oleh manajemen untuk memungkinkan necessary to enable the preparation of
penyusunan laporan keuangan konsolidasian consolidated financial statements that are free
yang bebas dari kesalahan penyajian material, from material misstatement, whether due to fraud
baik yang disebabkan oleh kecurangan maupun or error.
kesalahan.
Dalam penyusunan laporan keuangan In preparing the consolidated financial statements,
konsolidasian, manajemen bertanggung jawab management is responsible for assessing the
untuk menilai kemampuan Grup dalam Group’s ability to continue as a going concern,
mempertahankan kelangsungan usahanya, disclosing, as applicable, matters related to going
mengungkapkan, sesuai dengan kondisinya, hal- concern entities and using the going concern basis
hal yang berkaitan dengan kelangsungan usaha, of accounting unless management either intends
dan menggunakan basis akuntansi to liquidate the Group or to cease operations, or
kelangsungan usaha, kecuali manajemen has no realistic alternative but to do so.
memiliki intensi untuk melikuidasi Grup atau
menghentikan operasi, atau tidak memiliki
alternatif yang realistis selain melaksanakannya.
Pihak yang bertanggung jawab atas tata kelola Those charged with governance are responsible
bertanggung jawab untuk mengawasi proses for overseeing the Group’s financial reporting
pelaporan keuangan Grup. process.
v
Page 9
Tanggung Jawab Auditor terhadap Audit atas Auditor’s Responsibilities for the Audit of the
Laporan Keuangan Konsolidasian Consolidated Financial Statements
Tujuan kami adalah untuk memperoleh Our objectives are to obtain reasonable assurance
keyakinan memadai tentang apakah laporan about whether the consolidated financial
keuangan konsoliasian secara keseluruhan statements as a whole are free from material
bebas dari kesalahan penyajian material, baik misstatement, whether due to fraud or error, and
yang disebabkan oleh kecurangan maupun to issue an auditor’s report that includes our
kesalahan, dan untuk menerbitkan laporan opinion. Reasonable assurance is a high level of
auditor yang mencakup opini kami. Keyakinan assurance, but is not a guarantee that an audit
memadai merupakan suatu tingkat keyakinan conducted in accordance with Standards on
tinggi, namun bukan merupakan suatu jaminan Auditing will always detect a material misstatement
bahwa audit yang dilaksanakan berdasarkan when it exists. Misstatements can arise from fraud
Standar Audit akan selalu mendeteksi kesalahan or error and are considered material if, individually
penyajian material ketika hal tersebut ada. or in the aggregate, they could reasonably be
Kesalahan penyajian dapat disebabkan oleh expected to influence the economic decisions of
kecurangan maupun kesalahan dan dianggap users taken on the basis of these consolidated
material jika, baik secara individual maupun financial statements.
secara agregat, dapat diekspektasikan secara
wajar akan memengaruhi keputusan ekonomi
yang diambil oleh pengguna berdasarkan
laporan keuangan konsolidasian tersebut.
Sebagai bagian dari suatu audit berdasarkan As part of an audit in accordance with Standards
Standar Audit, kami menerapkan pertimbangan on Auditing, we exercise professional judgment
profesional dan mempertahankan skeptisisme and maintain professional skepticism throughout
profesional selama audit. Kami juga: the audit. We also:
• Mengidentifikasi dan menilai risiko • Identify and assess the risks of material
kesalahan penyajian material dalam laporan misstatement of the consolidated financial
keuangan konsolidasian, baik yang statements, whether due to fraud or error,
disebabkan oleh kecurangan maupun design and perform audit procedures
kesalahan, mendesain dan melaksanakan responsive to those risks, and obtain audit
prosedur audit yang responsif terhadap risiko evidence that is sufficient and appropriate to
tersebut, serta memeroleh bukti audit yang provide a basis for our opinion. The risk of not
cukup dan tepat untuk menyediakan basis detecting a material misstatement resulting
bagi opini kami. Risiko tidak terdeteksinya from fraud is higher than for one resulting from
kesalahan penyajian material yang error, as fraud may involve collusion, forgery,
disebabkan oleh kecurangan lebih tinggi dari intentional omissions, misrepresentations, or
yang disebabkan oleh kesalahan, karena the override of internal control.
kecurangan dapat melibatkan kolusi,
pemalsuan, penghilangan secara sengaja,
pernyataan salah, atau pengabaian
pengendalian internal.
• Memperoleh suatu pemahaman tentang • Obtain an understanding of internal control
pengendalian internal yang relevan dengan relevant to the audit to design audit
audit untuk mendesain prosedur audit yang procedures that are appropriate in the
tepat sesuai dengan kondisinya, tetapi bukan circumstances, but not for the purpose of
untuk tujuan menyatakan opini atas expressing an opinion on the effectiveness of
keefektifan pengendalian internal Grup. the Group’s internal control.
• Mengevaluasi ketepatan kebijakan akuntansi • Evaluate the appropriateness of accounting
yang digunakan serta kewajaran estimasi policies used and the reasonableness of
akuntansi dan pengungkapan terkait yang accounting estimates and related disclosures
dibuat oleh manajemen. made by management.
vi
Page 10
• Menyimpulkan ketepatan penggunaan basis • Conclude on the appropriateness of
akuntansi kelangsungan usaha oleh management’s use of the going concern basis
manajemen dan, berdasarkan bukti audit of accounting and, based on the audit
yang diperoleh, apakah terdapat suatu evidence obtained, whether a material
ketidakpastian material yang terkait dengan uncertainty exists related to events or
peristiwa atau kondisi yang dapat conditions that may cast significant doubt on
menyebabkan keraguan signifikan atas the Group’s ability to continue as a going
kemampuan Grup untuk mempertahankan concern. If we conclude that a material
kelangsungan usahanya. Ketika kami uncertainty exists, we are required to draw
menyimpulkan bahwa terdapat suatu attention in our auditor’s report to the related
ketidakpastian material, kami diharuskan disclosures in the consolidated financial
untuk menarik perhatian dalam laporan statements or, if such disclosures are
auditor kami ke pengungkapan terkait dalam inadequate, to modify our opinion. Our
laporan keuangan konsolidasian atau, jika conclusions are based on the audit evidence
pengungkapan tersebut tidak memadai, obtained up to the date of our auditor’s report.
harus menentukan apakah perlu untuk However, future events or conditions cause
memodifikasi opini kami. Kesimpulan kami the Group may not continue the operation as a
didasarkan pada bukti audit yang diperoleh going concern entities.
hingga tanggal laporan auditor kami. Namun,
peristiwa atau kondisi masa depan dapat
menyebabkan Grup tidak dapat
mempertahankan kelangsungan usaha.
• Mengevaluasi penyajian, struktur, dan isi • Evaluate the overall presentation, structure
laporan keuangan konsolidasian secara and content of the consolidated financial
keseluruhan, termasuk pengungkapannya, statements, including the disclosures, and
dan apakah laporan keuangan konsolidasian whether the consolidated financial statements
mencerminkan transaksi dan peristiwa yang represent the underlying transactions and
mendasarinya dengan suatu cara yang events in a manner that achieves fair
mencapai penyajian wajar. presentation.
• Memperoleh bukti audit yang cukup dan • Obtain sufficient appropriate audit evidence
tepat terkait informasi keuangan entitas atau regarding the financial information of the
aktivitas bisnis dalam Grup untuk entities or business activities within the Group
menyatakan opini atas laporan keuangan to express an opinion on the consolidated
konsolidasian. Kami bertanggung jawab atas financial statements. We are responsible for
arahan, supervisi, dan pelaksanaan audit the direction, supervision and performance of
Grup. Kami tetap bertanggung jawab the group audit. We remain solely responsible
sepenuhnya atas opini audit kami. for our audit opinion.
Kami mengomunikasikan kepada pihak yang We communicate with those charged with
bertanggung jawab atas tata kelola mengenai, governance regarding, among other matters, the
antara lain, ruang lingkup dan saat yang planned scope and timing of the audit and
direncanakan atas audit, serta temuan audit significant audit findings, including any significant
signifikan, termasuk setiap defisiensi signifikan deficiencies in internal control that we identify
dalam pengendalian internal yang teridentifikasi during our audit.
oleh kami selama audit.
Kami juga memberikan suatu pernyataan kepada We also provide those charged with governance
pihak yang bertanggung jawab atas tata kelola with a statement that we have complied with
bahwa kami telah mematuhi ketentuan etika relevant ethical requirements regarding
yang relevan mengenai independensi, dan independence, and to communicate with them all
mengomunikasikan seluruh hubungan serta hal- relationships and other matters that may
hal lain yang dianggap secara wajar berpengaruh reasonably be thought to bear on our
terhadap independensi kami, dan jika relevan, independence, and where applicable, related
pengamanan terkait. safeguards.
vii
Page 11
Dari hal-hal yang dikomunikasikan kepada pihak From the matters communicated with those
yang bertanggung jawab atas tata kelola, kami charged with governance, we determine those
menentukan hal-hal tersebut yang paling matters that were of most significance in the audit
signifikan dalam audit atas laporan keuangan of the consolidated financial statements of the
konsolidasian periode kini dan oleh karenanya current period and are therefore the key audit
menjadi hal audit utama. Kami menguraikan hal matters. We describe these matters in our auditors'
audit utama dalam laporan auditor kami kecuali report unless law or regulation precludes public
peraturan perundang-undangan melarang disclosure about the matter or when, in extremely
pengungkapan publik tentang hal tersebut atau rare circumstances, we determine that a matter
ketika, dalam kondisi yang sangat jarang terjadi, should not be communicated in our report because
kami menentukan bahwa suatu hal tidak boleh
the adverse consequences of doing so would
dikomunikasikan dalam laporan kami karena
reasonably be expected to outweigh the public
konsekuensi merugikan dari mengomunikasikan
hal tersebut akan diekspektasikan secara wajar interest benefits of such communication.
melebihi manfaat kepentingan publik atas
komunikasi tersebut.
Irwanto & Rekan
Nino Berlianto, SE, CPA, CACP
Izin Akuntan Publik No. AP 1961/
Public Accountant License No. AP 1961
Bekasi, 1 September 2026/Bekasi, September 1, 2026
viii
Page 12
PT TERREGRA ASIA ENERGY Tbk DAN ENTITAS ANAK PT TERREGRA ASIA ENERGY Tbk AND ITS SUBSIDIARIES
LAPORAN POSISI KEUANGAN KONSOLIDASIAN CONSOLIDATED STATEMENT OF FINANCIAL POSITIONS
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
Catatan/
2025 Notes 2024
ASET ASSETS
ASET LANCAR CURRENT ASSETS
Kas dan setara kas 121.026.693 2g,4 254.853.208 Cash and cash equivalents
Piutang usaha dari pihak ketiga - Trade accounts receivable from
setelah dikurangi penurunan nilai third parties - net off allowance
masing-masing sebesar for impariment of Nil
Nihil dan Rp 5.516.808.508 and Rp 5,516,808,508
pada tanggal 31 Desember 2025 as of December 31, 2025
dan 2024 - 5 - and 2024, respectively
Piutang lain-lain dari pihak ketiga - Other accounts receivable from
setelah dikurangi penurunan nilai third parties - net off allowance
sebesar Rp 271.880.000 for impariment of Rp 271,880,000
pada tanggal 31 Desember 2025 3.000.000 6 740.000.000 as of December 31, 2025
Pajak dibayar dimuka 7.790.981 7 1.324.692.764 Prepaid tax
Uang muka jangka pendek 36.880.000 8 - Short-term advances
Aset lancar lainnya - 9 11.606.000.000 Other current assets
Jumlah Aset Lancar 168.697.674 13.925.545.972 Total Current Assets
ASET TIDAK LANCAR NONCURRENT ASSETS
Deposito yang dibatasi penggunaannya 7.998.000.000 2g,4 16.289.052.960 Restricted time deposits
Piutang lain-lain dari Other accounts receivables
pihak berelasi 2.774.830.500 6,24 2.325.255.500 from related parties
Uang muka jangka panjang - 8 5.117.600.000 Long-term advances
Aset pajak tangguhan 1.078.943.223 2r,23 3.371.446.824 Deferred tax assets
Aset tetap - setelah dikurangi Fixed assets - net of
akumulasi penyusutan masing-masing accumulated depreciation of
sebesar Rp 2.441.078.584 dan Rp 2,441,078,584 and
Rp 2.851.110.662 masing-masing Rp 2,851,110,662 as of
pada tanggal 31 Desember 2025 December 31, 2025
dan 2024 178.579.743.864 2j,10 356.206.186.858 and 2024, respectively
Goodwill 15.853.772.494 2l,11 61.349.948.432 Goodwill
Aset lain-lain - 2m,12 - Other assets
Jumlah Aset Tidak Lancar 206.285.290.081 444.659.490.574 Total Noncurrent Assets
JUMLAH ASET 206.453.987.755 458.585.036.546 TOTAL ASSETS
Catatan atas laporan keuangan konsolidasian merupakan The accompanying notes to the consolidated financial
bagian tidak terpisahkan dari laporan keuangan konsolidasian statements are an Integral part of the consolidated financial
secara keseluruhan statements taken as a whole.
-1-
Page 13
PT TERREGRA ASIA ENERGY Tbk DAN ENTITAS ANAK PT TERREGRA ASIA ENERGY Tbk AND ITS SUBSIDIARIES
LAPORAN POSISI KEUANGAN CONSOLIDATED STATEMENT OF
KONSOLIDASIAN (Lanjutan) FINANCIAL POSITIONS (Continued)
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
Catatan/
2025 Notes 2024
LIABILITAS DAN EKUITAS LIABILITIES AND EQUITY
LIABILITAS JANGKA PENDEK CURRENT LIABILITIES
Utang bank jangka pendek 8.718.203.650 13 8.816.042.810 Short-term bank loan
Utang lain-lain kepada Other accounts payable to
pihak ketiga 14.074.501.076 14 25.626.153.156 third parties
Utang pajak 10.696.049.684 15 5.760.686.084 Taxes payable
Beban akrual 18.072.241.226 16 15.435.193.689 Accrued expenses
Utang pihak berelasi non usaha 98.842.187.847 24 88.291.187.853 Due to related parties
Jumlah Liabilitas Jangka Pendek 150.403.183.483 143.929.263.592 Total Current Liabilities
LIABILITAS JANGKA PANJANG NONCURRENT LIABILITIES
Liabilitas imbalan kerja Long-term employee
jangka panjang 4.632.407.376 2q,22 3.940.871.317 benefits liability
Jumlah Liabilitas Jangka Panjang 4.632.407.376 3.940.871.317 Total Noncurrent Liabilities
Jumlah Liabilitas 155.035.590.859 147.870.134.909 Total Liabilities
EKUITAS EQUITY
Ekuitas yang dapat Diatribusikan Equity Attributable to Owners
kepada Pemilik Entitas Induk of the Company
Modal saham Capital stock
Modal dasar - 8.800.000.000, Authorized - 8,800,000,000,
saham dengan nilai nominal and 100,000 shares with
Rp 100 masing-masing pada Rp 100 par value per share as of
tanggal 31 Desember 2025 December 31, 2025 and 2024,
dan 2024 respectively
Modal ditempatkan dan disetor - Issued and paid-up -
2.750.000.000 masing-masing 2,750,000,000 share as of
pada tanggal 31 Desember 2025 December 31, 2025 and 2024,
dan 2024 275.000.000.000 17 275.000.000.000 respectively
Tambahan modal disetor 46.574.881.122 17 46.574.881.122 Additional paid-in capital
Selisih nilai transaksi dengan pihak Difference arising from transactions
nonpengendali (10.625.770.020) 18 (10.625.770.020) with non-controlling interests
Defisit (272.407.947.388) (45.383.957.065) Deficit
Jumlah ekuitas yang dapat diatribusikan Total equity attributable
kepada pemilik Entitas Induk 38.541.163.714 265.565.154.037 to owners of the company
Kepentingan nonpengendali 12.877.233.182 19 45.149.747.600 Non-controlling interests
Jumlah Ekuitas 51.418.396.896 310.714.901.637 Total Equity
JUMLAH LIABILITAS DAN EKUITAS 206.453.987.755 458.585.036.546 TOTAL LIABILITIES AND EQUITY
Catatan atas laporan keuangan konsolidasian merupakan The accompanying notes to the consolidated financial
bagian tidak terpisahkan dari laporan keuangan konsolidasian statements are an Integral part of the consolidated financial
secara keseluruhan statements taken as a whole.
-2-
Page 14
PT TERREGRA ASIA ENERGY Tbk DAN ENTITAS ANAK PT TERREGRA ASIA ENERGY Tbk DAN ENTITAS ANAK
LAPORAN LABA RUGI DAN CONSOLIDATED STATEMENTS OF PROFIT OR LOSS
PENGHASILAN KOMPREHENSIF LAIN KONSOLIDASIAN AND OTHER COMPREHENSIVE INCOME
Untuk Tahun-tahun Yang Berakhir For the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
Catatan/
2025 Notes 2024
PENDAPATAN USAHA - - OPERATING REVENUES
BEBAN POKOK PENDAPATAN - - COST OF REVENUES
LABA KOTOR - - GROSS PROFIT
BEBAN USAHA OPERATING EXPENSES
Umum dan administrasi (6.984.792.004) 20 (13.803.334.778) General and administrative
RUGI USAHA (6.984.792.004) (13.803.334.778) OPERATING LOSS
PENGHASILAN (BEBAN) LAIN-LAIN OTHER INCOME (EXPENSES)
Pendapatan bunga 194.722.242 296.601.017 Interest income
Keuntungan (kerugian) Gain (loss) on sale
penjualan aset tetap (21.000.000) 10 435.465.928 of fixed assets
Kerugian selisih kurs mata uang Loss on
asing - bersih (461.444.361) (555.100.922) foreign exchanges - net
Beban bunga dan keuangan lainnya (809.679.424) 21 (1.896.346.763) Interest and other financial charges
Biaya klaim bank garansi (8.289.552.960) - Bank guarantee claim fees
Beban pajak (10.156.443.746) 23 (36.669.441) Tax expenses
Penurunan nilai goodwill (45.496.175.938) 11 (5.109.587.286) Impairment of goodwill
Penurunan nilai aset tetap Impairment of assets
dalam pembangunan (181.235.058.535) 10 - in progress
Beban lain-lain (4.027.980.925) (5.220.561.531) Other expenses
Beban lain-lain - Bersih (250.302.613.647) (12.086.198.998) Other Expenses - Net
RUGI SEBELUM PAJAK (257.287.405.651) (25.889.533.776) LOSS BEFORE TAX
MANFAAT (BEBAN) PAJAK (2.230.154.609) 2r,23 2.190.728.056 TAX BENEFIT (EXPENSE)
RUGI TAHUN BERJALAN (259.517.560.260) (23.698.805.720) LOSS FOR THE YEAR
PENGHASILAN OTHER COMPREHENSIVE
KOMPREHENSIF LAIN INCOME
Pos yang tidak akan direklasifikasi Item that will not be reclassified
ke laba rugi subsequently to profit and loss
Pengukuran kembali liabilitas Remeasurement of defined
imbalan kerja jangka panjang 283.404.511 46.600.696 benefits liability
Pajak terkait (62.348.992) (10.252.154) Related tax
Jumlah Penghasilan Total Other Comprehensive
Komprehensif Lain 221.055.519 36.348.542 Income
JUMLAH RUGI TOTAL COMPREHENSIVE
KOMPREHENSIF (259.296.504.741) (23.662.457.178) LOSS
Catatan atas laporan keuangan konsolidasian merupakan The accompanying notes to the consolidated financial
bagian tidak terpisahkan dari laporan keuangan konsolidasian statements are an Integral part of the consolidated financial
secara keseluruhan statements taken as a whole.
-3-
Page 15
PT TERREGRA ASIA ENERGY Tbk DAN ENTITAS ANAK PT TERREGRA ASIA ENERGY Tbk DAN ENTITAS ANAK
LAPORAN LABA RUGI DAN CONSOLIDATED STATEMENTS OF PROFIT OR LOSS
PENGHASILAN KOMPREHENSIF LAIN KONSOLIDASIAN AND OTHER COMPREHENSIVE INCOME
Untuk Tahun-tahun Yang Berakhir For the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
Catatan/
2025 Notes 2024
JUMLAH RUGI TOTAL LOSS
TAHUN BERJALAN YANG DAPAT FOR THE YEAR
DIATRIBUSIKAN KEPADA: ATTRIBUTABLE TO:
Pemilik entitas induk (227.245.038.774) (23.098.573.548) Owners of the Company
Kepentingan nonpengendali (32.272.521.486) (600.232.172) Non-controlling interests
Jumlah (259.517.560.260) (23.698.805.720) Total
JUMLAH RUGI KOMPREHENSIF YANG TOTAL COMPREHENSIVE LOSS
DAPAT DIATRIBUSIKAN KEPADA: ATTRIBUTABLE TO:
Pemilik entitas induk (227.023.990.323) (23.066.053.417) Owners of the Company
Kepentingan nonpengendali (32.272.514.418) 19 (596.403.761) Non-controlling interests
Jumlah (259.296.504.741) (23.662.457.178) Total
RUGI TAHUN BERJALAN LOSS PER SHARE FOR
PER SAHAM (94) 2t,25 (9) THE YEAR
Catatan atas laporan keuangan konsolidasian merupakan The accompanying notes to the consolidated financial
bagian tidak terpisahkan dari laporan keuangan konsolidasian statements are an Integral part of the consolidated financial
secara keseluruhan statements taken as a whole.
-4-
Page 16
PT TERREGRA ASIA ENERGY Tbk DAN ENTITAS ANAK PT TERREGRA ASIA ENERGY Tbk DAN ENTITAS ANAK
LAPORAN PERUBAHAN EKUITAS KONOLIDASIAN CONSOLIDATED STATEMENT OF CHANGES IN EQUITY
Untuk Tahun-tahun yang Berakhir For the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
Ekuitas yang Dapat Diatribusikan kepada Pemilik Entitas Induk/
Equity Atributable to the Owners of the Company
Selisih Nilai Transaksi
dengan Pihak
Non Pengendali/
Difference in Value
Arising from
Modal Ditempatkan Tambahan Modal Transactions with Saldo Laba (Defisit)/ Kepentingan Non
Catatan/ dan Disetor/Issued Disetor/Additional Non Controlling Retained Earnings Pengendali/Non- Jumlah Ekuitas/
Notes and Paid-up Capital Paid-up Capital Interest (Deficit) Jumlah/Total Controlling Interest Total Equity
Saldo pada tanggal 1 Januari 2024 17 275.000.000.000 46.574.881.122 (10.625.770.020) (22.317.903.648) 288.631.207.454 45.746.151.361 334.377.358.815 Balance as of January 1, 2024
Rugi komprehensif Loss comprehensive
Rugi tahun berjalan - - - (23.098.573.548) (23.098.573.548) (600.232.172) (23.698.805.720) Loss for the year
Penghasilan komprehensif lain Other comprehensive income
Pengukuran kembali imbalan kerja Remeasurement of long-term employee
jangka panjang - bersih - - - 32.520.131 32.520.131 3.828.411 36.348.542 benefits liability - net
Jumlah penghasilan komprehensif - - - (23.066.053.417) (23.066.053.417) (596.403.761) (23.662.457.178) Total comprehensive income
Saldo pada tanggal 31 Desember 2024 17 275.000.000.000 46.574.881.122 (10.625.770.020) (45.383.957.065) 265.565.154.037 45.149.747.600 310.714.901.637 Balance as of December 31, 2024
Rugi komprehensif Loss comprehensive
Rugi tahun berjalan - - - (227.245.038.774) (227.245.038.774) (32.272.521.486) (259.517.560.260) Loss for the year
Penghasilan komprehensif lain Other comprehensive income
Pengukuran kembali imbalan kerja Remeasurement of long-term employee
jangka panjang - bersih - - - 221.048.451 221.048.451 7.068 221.055.519 benefits liability - net
Jumlah penghasilan komprehensif - - - (227.023.990.323) (227.023.990.323) (32.272.514.418) (259.296.504.741) Total comprehensive income
Saldo pada tanggal 31 Desember 2025 17 275.000.000.000 46.574.881.122 (10.625.770.020) (272.407.947.388) 38.541.163.714 12.877.233.182 51.418.396.896 Balance as of December 31, 2025
Lihat catatan atas laporan keuangan yang merupakan See accompanying notes to financial statements
bagian yang tidak terpisahkan dari laporan keuangan. which are an integral part of the financial statements.
-5-
Page 17
PT TERREGRA ASIA ENERGY Tbk DAN ENTITAS ANAK PT TERREGRA ASIA ENERGY Tbk DAN ENTITAS ANAK
LAPORAN ARUS KAS KONSOLIDASIAN CONSOLIDATED STATEMENTS OF CASH FLOW
Untuk Tahun-tahun yang Berakhir For the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
Catatan/
2025 Notes 2024
ARUS KAS DARI CASH FLOWS FROM
AKTIVITAS OPERASI OPERATING ACTIVITIES
Penerimaan dari pelanggan - 7.354.188.461 Cash receipts from customers
Pembayaran kepada pemasok Cash paid to suppliers
dan lainnya (3.287.744.253) (7.352.966.232) and others
Pembayaran kepada karyawan (4.297.331.276) (4.572.099.481) Cash paid to employees
Kas Bersih Digunakan Net Cash Provided by
Aktivitas Operasi (7.585.075.529) (4.570.877.252) Operating Activities
ARUS KAS DARI CASH FLOWS FROM
AKTIVITAS INVESTASI INVESTING ACTIVITIES
Penerimaan bunga 194.722.242 296.601.017 Interest received
Penambahan uang muka jangka panjang - (2.091.014.704) Additional of long-term advances
Perolehan aset tetap - 10 (2.298.000.000) Acquisitions of fixed assets
Hasil penjualan aset tetap 194.000.000 10 1.606.717.212 Proceeds from sale of fixed assets
Kas Bersih Diperoleh dari (Digunakan Net Cash Provided by (Used in)
untuk) Aktivitas Investasi 388.722.242 (2.485.696.475) Investing Activities
ARUS KAS DARI CASH FLOWS FROM
AKTIVITAS PENDANAAN FINANCING ACTIVITIES
Penerimaan utang pihak Due to related parties
berelasi non usaha 7.872.206.196 8.386.111.077 received
Pembayaran Beban bunga dan Payment of Interest and other
keuangan lainnya (809.679.424) (1.896.346.763) financial charges
Kas Bersih Diperoleh dari Net Cash Provided by
Aktivitas Pendanaan 7.062.526.772 6.489.764.314 Financing Activities
PENURUNAN BERSIH KAS DAN NET DECREASE IN
SETARA KAS (133.826.515) (566.809.413) CASH AND CASH EQUIVALENTS
KAS DAN SETARA KAS CASH AND CASH EQUIVALENTS AT
AWAL TAHUN 254.853.208 821.662.621 THE BEGINNING OF THE YEAR
KAS DAN SETARA KAS CASH AND CASH EQUIVALENTS AT
AKHIR TAHUN 121.026.693 254.853.208 THE END OF THE YEAR
Tambahan Informasi Laporan Arus Kas Supplemental Cash Flow Information
diungkapkan dalam Catatan 30 is presented in Note 30
Lihat catatan atas laporan keuangan yang merupakan See accompanying notes to financial statements
bagian yang tidak terpisahkan dari laporan keuangan. which are an integral part of the financial statements.
-6-
Page 18
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
1. UMUM 1. GENERAL
a. Pendirian dan Informasi Umum a. Establishment and General
Information
PT Terregra Asia Energy Tbk (d/h PT Terregra Asia Energy Tbk (formerly
PT Mitra Megatama Perkasa) PT Mitra Megatama Perkasa) (the
(Perusahaan) didirikan berdasarkan Company) was established based on
Akta No. 31 tanggal 7 November 1995 Notarial Deed No. 31 dated November
dari T. Francisca Teresa N., S.H., 7, 1995 of T. Francisca Teresa N., S.H.,
notaris di Denpasar. Akta pendirian ini a public notary in Denpasar. The Deed
disahkan oleh Menteri Kehakiman dan of Establishment was approved by the
Hak Asasi Manusia Republik Minister of Justice and Human Rights of
Indonesia dalam Surat Keputusan No. the Republic of Indonesia in his
C2-6507 HT.01.01.Th 96 tanggal 6 Decision Letter No. C2-6507
Maret 1996. HT.01.01.Th 96 dated March 6, 1996.
Perusahaan telah mengalami The Company changed its name
perubahan nama semula bernama formerly known as PT Mitra Megatama
PT Mitra Megatama Perkasa menjadi Perkasa to PT Terregra Asia Energy
PT Terregra Asia Energy berdasarkan based on Notarial Deed No. 189 dated
Akta No. 189 tanggal 28 Oktober 2016 October 28, 2016 of Humberg Lie, S.H.,
yang dibuat di hadapan Humberg Lie, S.E., M.Kn., a public notary in Jakarta.
S.H., S.E., M.Kn., notaris di Jakarta. This amendment was approved by the
Akta perubahan ini telah disahkan Minister of Law and Human Rights of
oleh Menteri Hukum dan Hak Asasi the Republic of Indonesia in his
Manusia Republik Indonesia dalam Decision Letter No. AHU-
Surat Keputusannya No. 0128438.AH.01.11.Tahun 2016 dated
AHU0128438. AH.01.11.Tahun 2016 October 28, 2016.
tanggal 28 Oktober 2016.
Anggaran Dasar Perusahaan kembali The Company's Articles of Association
diubah dengan Akta No. 118 tanggal were again amended by Deed No. 118
24 Juli 2017 dari Humberg Lie, S.H., July 24, 2017 of Humberg Lie, S.H.,
S.E., M.Kn., notaris di Jakarta, S.E., M.Kn., a public notary in Jakarta,
sehubungan dengan pengeluaran concerning the issuance of the
saham dalam simpanan Perusahaan Company's saving shares through the
melalui Penawaran Umum Saham Initial Public Offering and the change of
Perdana dan perubahan susunan shareholder structure. This amendment
pemegang saham. Perubahan was approved by the Minister of Law
Anggaran Dasar tersebut telah and Human Rights of the Republic of
disahkan oleh Menteri Hukum dan Indonesia in his Decision Letter No.
Hak Asasi Manusia Republik AHU-00090791.AH.01.11.TAHUN 2017
Indonesia dalam Surat Keputusan No. dated July 25, 2017.
AHU00090791.AH.01.11. TAHUN
2017 pada tanggal 25 Juli 2017.
-7-
Page 19
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
1. UMUM (Lanjutan) 1. GENERAL (Continued)
a. Pendirian dan Informasi Umum a. Establishment and General
(Lanjutan) Information (Continued)
Sesuai dengan pasal 3 dari Anggaran In accordance with article 3 of the
Dasar Perusahaan, ruang lingkup Company's Articles of Association, the
kegiatan Perusahaan terutama Company's scope of activities mainly
meliputi pembangkit tenaga listrik, includes power generation, electricity
transaksi tenaga listrik dan penjualan transactions and electricity sales, as a
tenaga listrik, sebagai suatu kesatuan single business unit. Construction of
usaha. Konstruksi bangunan sipil civil electrical buildings, construction of
elektrikal, konstruksi bangunan water resources infrastructure buildings.
prasarana sumber daya air.
Perusahaan dan Entitas Anak The Company and its Subsidiaries are
selanjutnya disebut Grup. hereinafter referred to as the Group.
Perusahaan memulai usahanya The Company started its commercial
secara komersial pada tahun 1996. operations in 1996.
Kantor pusat Perusahaan terletak di Its head office is located at Jl. Haji Nawi
Jl. Haji Nawi Raya No. 45, Gandaria Raya No. 45, Gandaria Selatan,
Selatan, Cilandak Jakarta Selatan. Cilandak Jakarta Selatan.
Pemegang saham akhir Grup The ultimate parent of the Group
adalah PT Terregra Asia Equity yang is PT Terregra Asia Equity, a limited
berkedudukan di Indonesia. liability company incorporated in
Indonesia.
b. Penawaran Umum Efek b. Public Offering of Shares
Perusahaan
Pada tanggal 28 April 2017, On April 28, 2017, the Company
Perusahaan mendapatkan obtained the Notice of Effectivity No. S-
pernyataan efektif dari Otoritas Jasa 208/D.04/2017 from the Chairman of the
Keuangan (OJK) dengan surat No. Financial Services Authority (OJK) for
S208/D.04/2017 atas perubahan the change of the Company’s name
nama Perusahaan dari PT Mitra from PT Mitra Megatama Perkasa to
Megatama Perkasa menjadi PT Terregra Asia Energy Tbk and for its
PT Terregra Asia Energy Tbk dan initial public offering of 550,000,000
Penawaran Umum Perdana Saham
shares at Rp 200 per share. On May 16,
Perusahaan dengan jumlah
2017, all of these shares were listed in
penawaran umum 550.000.000
saham Perusahaan seharga Rp 200 the Indonesia Stock Exchange.
(dalam Rupiah penuh) per saham
kepada masyarakat dan telah
dicatatkan pada Bursa Efek Indonesia
pada tanggal 16 Mei 2017.
-8-
Page 20
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
1. UMUM (Lanjutan) 1. GENERAL (Continued)
b. Penawaran Umum Efek b. Public Offering of Shares
Perusahaan
Pada tanggal 31 Desember 2025 dan As of December 31, 2025 and 2024, all
2024, seluruh saham Perusahaan of the Company’s 2,750,000,000 shares
atau sejumlah 2.750.000.000 saham were listed in the Indonesia Stock
telah tercatat di Bursa Efek Indonesia. Exchange.
c. Entitas Anak yang c. Consolidated Subsidiaries
Dikonsolidasikan
Pada tanggal 31 Desember 2025 dan As of December 31, 2025 and 2024, the
2024, entitas anak yang subsidiaries which were consolidated,
dikonsolidasikan termasuk persentase including the respective percentages of
kepemilikan Perusahaan adalah ownership held by the Company, were
sebagai berikut: as follows:
Persentase Kepemilikan
dan Hak Suara/Percentage Tahun Operasi
of Ownership and Voting Jumlah Aset (Sebelum Eliminasi)/ Lokasi Usaha Utama/ Komersil/Year of
Rights Total Assets (Before Elimination) Principal Place of Jenis Usaha/ Commercial
Entitas Anak/Name of Subsidiaries 2025 2024 2025 2024 Business Principal Activity Operation
Kepemilikan langsung/Direct Ownership
Pembangkit Tenaga Listrik/
PT Terregra Hydro Power (THP) 99,99% 99,99% 209.308.671.133 445.386.499.502 Jakarta Electric power plant Holding
Kepemilikan tidak langsung/Indirect ownership :
Kepemilikan melalui/Ownership trough
PT Terregra Hydro Power (THP):
Pembangkit Tenaga Listrik/
PT Sumber Alam Energi Hidro (SAEH) 87,00% 87,00% 330.409.011 57.898.414.670 Sumatera Utara Electric power plant b
Pembangkit Tenaga Listrik/
PT Cahaya Abadi Lestari Energi (CALE) 85,21% 85,21% 1.998.561 4.897.338.372 Sumatera Utara Electric power plant a
Pembangkit Tenaga Listrik/
PT Karya Alam Lestari Energi (KALE) 85,05% 85,05% - 3.172.427.594 Sumatera Utara Electric power plant a
Pembangkit Tenaga Listrik/
PT Berkah Alam Lestari Energi (BALE) 56,18% 56,18% 68.097.814.210 122.836.336.767 Sumatera Utara Electric power plant b
Pembangkit Tenaga Listrik/
PT Energi Alam Sentosa (EAS) 56,17% 56,17% 74.203.100.690 86.643.073.668 Sumatera Utara Electric power plant b
Pembangkit Tenaga Listrik/
PT Indah Alam Lestari Energi (IALE) 80,25% 80,25% 53.053.785.179 75.730.723.018 Sumatera Utara Electric power plant a
Pembangkit Tenaga Listrik/
PT Karya Abadi Lestari Energi (KABLE) 80,24% 80,24% 3.016.241 5.242.370.089 Sumatera Utara Electric power plant a
Pembangkit Tenaga Listrik/
PT Borneo Hydro Electric (BHE) 70,00% 70,00% 611.500.000 611.500.000 Kalimantan Electric power plant a
Pembangkit Tenaga Listrik/
PT Musi Hydro Electric (MHE) 70,00% 70,00% 406.147.055 691.085.976 Sumatera Selatan Electric power plant a
Pembangkit Tenaga Listrik/
PT Teunom Hidro Power (TEU) 74,00% 74,00% 56.727.560 21.200.107.222 Aceh Electric power plant a
Pembangkit Tenaga Listrik/
PT Meutia Hidro Perkasa (MHP) 74,00% 74,00% 252.437.332 22.551.726.489 Aceh Electric power plant a
PT MYI Hidro Power (MYIHP) 99,00% 99,00% 9.295.664.524 22.625.042.881 Jakarta Jasa/Service c
PT MYI Energi Lestari (MYIEL) 99,00% 99,00% 24.785.092.194 27.747.513.329 Jakarta Jasa/Service c
Kepemilikan tidak langsung/ Indirect ownership:
Kepemilikan melalui/ Ownership through
PT MYI Hidro Power (MYIHP) Pembangkit Tenaga Listrik/
PT Berkah Alam Lestari Energi (BALE) 24,07% 24,07% 68.097.814.210 122.836.336.767 Sumatera Utara Electric power plant b
PT MYI Energi Lestari (MYIEL) Pembangkit Tenaga Listrik/
PT Energi Alam Sentosa (EAS) 24,07% 24,07% 74.203.100.690 86.643.073.668 Sumatera Utara Electric power plant b
a) Belum beroperasi karena entitas anak masih dalam tahap pra-operasi (seperti: pembebasan lahan, melakukan uji kelayakan, dan lain-lain)/
It has not started its operation since the subsidiaries are still in pre-operating stage (such as: land clearing, feasibility study, etc).
b) Pra-operasi berarti sedang melakukan kegiatan-kegiatan yang dibutuhkan untuk mencapai tahapan produksi (commercial operation date )/
Pre-operation which means that these subsidiaries are undergoing activities that are needed to achieve production stage (commercial operation date).
c) Belum beroperasi/It has not started its operation
-9-
Page 21
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
1. UMUM (Lanjutan) 1. GENERAL (Continued)
c. Entitas Anak yang Dikonsolidasikan c. Consolidated Subsidiaries
(Lanjutan) (Continued)
Informasi keuangan entitas anak yang Financial information of subsidiaries that
dimiliki oleh kepentingan have material non-controlling interests
nonpengendali dalam jumlah material as of and for the years ended December
pada tanggal dan untuk tahun-tahun 31, 2025 and 2024 were as follows:
yang berakhir 31 Desember 2025 dan
2024 adalah sebagai berikut:
2025
Kepentingan Nonpengendali yang Material/Material Non-controlling Interest
Bagian Kepentingan
Nama Entitas Anak/ Kepemilikan/ Saldo Akumulasi/ Bagian Rugi/
Name of Subsidiaries Interest Held (%) Accumulated Balances Share in Loss
PT EAS 19,75% 13.626.864.025 (2.429.809.990)
PT BALE 19,75% 8.309.235.981 (10.685.318.287)
PT IALE 19,75% 2.112.477.021 (2.186.200.535)
PT SAEH 13,00% (4.010.483.079) (7.516.302.268)
2024
Kepentingan Nonpengendali yang Material/Material Non-controlling Interest
Bagian Kepentingan
Nama Entitas Anak/ Kepemilikan/ Saldo Akumulasi/ Bagian Laba (Rugi)/
Name of Subsidiaries Interest Held (%) Accumulated Balances Share in Profit (Loss)
PT EAS 19,75% 16.056.674.015 (98.205.461)
PT BALE 19,75% 19.049.552.738 (90.763.028)
PT IALE 19,75% 4.298.677.556 (18.883.086)
PT SAEH 13,00% 3.494.401.082 (70.581.503)
Berikut adalah ringkasan informasi The summarized financial information of
keuangan dari entitas anak. Jumlah- these subsidiaries is provided below.
jumlah tersebut sebelum dieliminasi This information is based on amounts
dengan transaksi antar entitas dalam before inter-company eliminations.
Grup. Ringkasan laporan posisi Summarized statements of financial
keuangan pada tanggal 31 Desember position as of December 31, 2025 and
2025 dan 2024: 2024:
2025
EAS BALE IALE SAEH
Aset lancar 17.284.160 78.048.918 2.546.960 1.388.011 Current assets
Aset tidak lancar 74.185.816.530 68.019.765.292 53.051.238.219 329.021.000 Non-current assets
Jumlah Aset 74.203.100.690 68.097.814.210 53.053.785.179 330.409.011 Total Assets
Liabilitas jangka pendek 4.540.155.393 9.430.542.884 - 2.688.855.291 Current liabilities
Liabilitas jangka panjang 14.867.192.126 56.414.677.408 42.358.148.484 28.496.687.274 Non-current liabilities
Jumlah Liabilitas 19.407.347.519 65.845.220.292 42.358.148.484 31.185.542.565 Total Liabilities
Jumlah Ekuitas 54.795.753.171 2.252.593.918 10.695.636.695 (30.855.133.554) Total Equity
Teratribusikan pada: Attributable to:
Pemilik entitas induk 41.168.889.146 (6.056.642.063) 8.583.159.674 (26.844.650.475) Owner of the company
Kepentingan nonpengendali 13.626.864.025 8.309.235.981 2.112.477.021 (4.010.483.079) Non-controlling interest
- 10 -
Page 22
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
1. UMUM (Lanjutan) 1. GENERAL (Continued)
c. Entitas Anak yang Dikonsolidasikan c. Consolidated Subsidiaries
(Lanjutan) (Continued)
2024
EAS BALE IALE SAEH
Aset lancar 119.000.942 1.229.322.297 6.076.630 3.328.718 Current assets
Aset tidak lancar 86.524.072.726 121.607.014.470 75.724.613.167 57.895.085.952 Non-current assets
Jumlah Aset 86.643.073.668 122.836.336.767 75.730.689.797 57.898.414.670 Total Assets
Liabilitas jangka pendek 4.385.336.253 9.734.233.218 11.606.000.000 2.699.632.731 Current liabilities
Liabilitas jangka panjang 15.159.217.125 56.467.120.781 53.966.148.484 28.314.187.274 Non-current liabilities
Jumlah Liabilitas 19.544.553.378 66.201.353.999 65.572.148.484 31.013.820.005 Total Liabilities
Jumlah Ekuitas 67.098.520.290 56.634.982.768 21.764.541.313 26.884.594.665 Total Equity
Teratribusikan pada: Attributable to:
Pemilik entitas induk 51.041.846.275 37.585.430.030 17.465.863.757 23.390.193.583 Owner of the company
Kepentingan nonpengendali 16.056.674.015 19.049.552.738 4.298.677.556 3.494.401.082 Non-controlling interest
Ringkasan laporan laba rugi dan Summarized statements of profit or loss
penghasilan komprehensif lain untuk and other comprehensive income for the
tahun-tahun yang berakhir pada years ended December 31, 2025 and
31 Desember 2025 dan 2024: 2024:
2025
EAS BALE IALE SAEH
Pendapatan - - - - Revenue
Harga pokok pendapatan - - - - Cost of Revenue
Laba kotor - - - - Gross profit
Beban usaha (65.895.996) (302.392.839) - (1.043.667.814) Operating expenses
Rugi usaha (65.895.996) (302.392.839) - (1.043.667.814) Operating loss
Pendapatan (beban) lain-lain (12.017.455.248) (53.924.350.727) (11.014.394.076) (56.313.393.417) Other income (expenses)
Rugi sebelum pajak (12.083.351.244) (54.226.743.566) (11.014.394.076) (57.357.061.231) Loss before tax
Manfaat (beban) pajak (219.415.875) (171.364.029) (54.510.543) (470.513.563) Tax benefit (expenses)
Rugi tahun berjalan (12.302.767.119) (54.398.107.595) (11.068.904.619) (57.827.574.794) Loss for the year
Penghasilan (beban) Other comprehensive
komprehensif lain - 15.718.746 - 87.846.575 income (loss)
Jumlah rugi komprehensif (12.302.767.119) (54.382.388.849) (11.068.904.619) (57.739.728.219) Total comprehensive loss
2024
EAS BALE IALE SAEH
Pendapatan - - - - Revenue
Harga pokok pendapatan - - - - Cost of Revenue
Laba kotor - - - - Gross profit
Beban usaha (439.331.421) (379.391.359) (89.362.200) (905.047.121) Operating expenses
Rugi usaha (439.331.421) (379.391.359) (89.362.200) (905.047.121) Operating loss
Pendapatan (beban) lain-lain (182.569.154) (274.648.030) 6.809.456 2.952.230 Other income (expenses)
Rugi sebelum pajak (621.900.575) (654.039.389) (82.552.744) (902.094.891) Loss before tax
Manfaat (beban) pajak 124.660.495 192.162.053 (13.053.800) 359.067.612 Tax benefit (expenses)
Rugi tahun berjalan (497.240.080) (461.877.336) (95.606.544) (543.027.279) Loss for the year
Penghasilan (beban) Other comprehensive
komprehensif lain - 2.308.924 - - income (loss)
Jumlah rugi komprehensif (497.240.080) (459.568.412) (95.606.544) (543.027.279) Total comprehensive loss
- 11 -
Page 23
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
1. UMUM (Lanjutan) 1. GENERAL (Continued)
c. Entitas Anak yang Dikonsolidasikan c. Consolidated Subsidiaries
(Lanjutan) (Continued)
Akuisisi Acquisitions
Pada tanggal 28 Oktober 2016, On October 28, 2016, the Company
Perusahaan mengakuisisi 99,99% acquired 99.99% of the share capital of
kepemilikan saham pada PT Terregra PT Terregra Hydro Power (THP), a
Hydro Power (THP), yang bergerak di power plant entity for
bidang pembangkit listrik, dengan nilai Rp 219,978,000,000.
akuisisi sebesar Rp.219.978.000.000.
Penilaian kewajaran dalam akuisisi Assessment of fairness in the
THP dilakukan dengan pendekatan acquisition of THP was conducted using
pasar. Setelah akuisisi THP, the market approach. As a result of the
Perusahaan berharap untuk dapat acquisition of THP, the Company is
meningkatkan eksistensi pasar, serta expected to increase its presence in this
menurunkan biaya dengan skala market. It also expects to reduce costs
ekonomis. through economies of scale.
Goodwill sebesar Rp.66.459.535.718 The goodwill of Rp,66,459,535,718
yang timbul dari akuisisi THP arising from the acquisition of THP is
teratribusikan pada pangsa pasar attributable to the acquired customer
konsumen yang diperoleh dan skala base and economies of scale expected
ekonomis yang diharapkan dari from combining the operation of the
penggabungan operasi Perusahaan Company and THP.
dan THP.
Tabel berikut adalah rekonsiliasi The following table is the reconciliation
imbalan kas yang dialihkan dan arus of cash consideration and cash flows
kas dari penggabungan usaha: from the business combination:
THP
Imbalan kas yang dialihkan 219.978.000.000 Cash consideration
Dikurangi saldo kas entitas anak yang diakuisisi Less cash balance of acquired subsidiaries
Kas dan bank (3.217.375.733) Cash on hand and in banks
Arus kas - aktivitas investasi 216.760.624.267 Cash flow - investing activities
- 12 -
Page 24
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
1. UMUM (Lanjutan) 1. GENERAL (Continued)
c. Entitas Anak yang Dikonsolidasikan c. Consolidated Subsidiaries
(Lanjutan) (Continued)
Akuisisi (Lanjutan) Acquisitions (Continued)
Rincian aset yang diakuisisi serta Recognized amounts of identifiable
liabilitas yang dialihkan adalah assets acquired and liabilities assumed
sebagai berikut: of THP were as follows:
Nilai wajar/Fair Value
THP
Kas dan bank 3.217.375.733 Cash on hand and in banks
Aset tetap 12.611.192.488 Fixed assets
Uang muka jangka panjang 133.788.871.775 Long-term advances
Aset pajak tangguhan 838.122.055 Deffered tax assets
Biaya ditangguhkan 50.762.962.554 Deferred costs
Goodwill 52.313.348.508 Goodwill
Jaminan 1.696.088.920 Security deposits
Aset lain-lain 17.305.211 Other assets
Utang lain-lain (5.062.782.384) Other account payable
Utang pajak (36.207.253) Taxes payable
Beban akrual (243.672.992) Accrued expenses
Utang pembelian aset tetap (8.957.683.378) Payable for purchase of property and equipment
Liabilitas imbalan kerja jangka panjang (77.994.079) Long-term employee beenfits liability
Jumlah aset bersih teridentifikasi 240.866.927.158 Total identifiable net assets
Kepentingan nonpengendali (35.035.114.368) Non-controlling interests
Imbalan atas pembelian 219.978.000.000 Purchase consideration
Goodwill 66.459.535.718 Goodwill
d. Dewan Komisaris, Direksi dan d. Board of Commissioners, Directors
Karyawan and Employees
Pada tanggal 31 Desember 2025 dan As of December 31, 2025 and 2024,
2024, susunan pengurus Perusahaan based on the Statement of
berdasarkan Pernyataan Keputusan Shareholders resolution dated
pemegang Saham pada tanggal September 20, 2022, as documented in
20 September 2022 dari yang Notarial Deed No. 7 of R.M. Dendy
didokumentasikan dalam Akta No. 7 Soebangil, S.H., M.Kn., a public notary
dari R.M. Dendy Soebangil, S.H., in Jakarta, the Company’s management
M.Kn. notaris di Jakarta, adalah consists of the following:
sebagai berikut:
Komisaris Utama : Ir. Ngurah Adyana : President Commissioners
Komisaris : Roy Petrus Chalim : Commissioners
Komisaris : Supandi Widi Siswanto* : Independent
Independen Commissioner
Direksi Director
Direktur Utama : Djani Sutedja : President Director
Direktur : Daniel PMD. T. Dedo : Director
*Telah mengundurkan diri sejak * Resigned effective June 20, 2025.
a20 Juni 2025.
- 13 -
Page 25
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
1. UMUM (Lanjutan) 1. GENERAL (Continued)
d. Dewan Komisaris, Direksi dan d. Board of Commissioners, Directors
Karyawan (Lanjutan) and Employees (Continued)
Sebagai perusahaan publik, As a public company, the Company has
Perusahaan telah memiliki Komisaris Independent Commissioners and an
Independen dan Komite Audit yang Audit Committee as required by
diwajibkan oleh Bapepam-LK Bapepam-LK (currently Financial
(sekarang Otoritas Jasa Services Authority). Supandi Widi
Keuangan/OJK). Supandi Widi Siswanto is the Company’s Independent
Siswanto adalah Komisaris Commissioner.
Independen Perusahaan.
Pada tanggal 31 Desember 2025, As of December 31, 2025, the
susunan Komite Audit Perusahaan composition of the Audit Committee of
berdasarkan Keputusan Sirkular the Company based on the Circular
Dewan Komisaris adalah sebagai Decision of the Board of Commissioners
berikut: is as follows:
Komite Audit Audit Committee
Ketua Komite Audit : - : Head of Audit Committee
Anggota Komite Members of Audit
Audit : Tisanto Adi : Committee
Ihot Parasian Gultom
Pada tanggal 20 Juni 2025, On June 20, 2025, the Company
Perusahaan menerima surat received a resignation letter from
pengunduran diri Supandi Widi Supandi Widi Siswanto. As of the date
Siswanto. Sampai tanggal laporan of the independent auditor's report, the
auditor independent, Perusahaan Company had not yet appointed a
belum menetapkan kembali ketua replacement for the head of audit
komite audit dan komisaris committee and independent
independent. commissioner.
Pada tanggal 31 Desember 2024, As of December 31, 2024, the
susunan Komite Audit Perusahaan composition of the Audit Committee of
berdasarkan Keputusan Sirkular the Company based on the Circular
Dewan Komisaris adalah sebagai Decision of the Board of Commissioners
berikut: is as follows:
Komite Audit Audit Committee
Ketua Komite Audit : Supandi Widi Siswanto : Head of Audit Committee
Anggota Komite Members of Audit
Audit : Tisanto Adi : Committee
Ihot Parasian Gultom
Personel manajemen kunci Grup dari Key Management personnel of the
Dewan Komisaris dan Direksi Group consists of Board of
Commissioners and Directors.
- 14 -
Page 26
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
1. UMUM (Lanjutan) 1. GENERAL (Continued)
d. Dewan Komisaris, Direksi dan d. Board of Commissioners, Directors
Karyawan (Lanjutan) and Employees (Continued)
Jumlah rata-rata karyawan The Company had an average total
Perusahaan (tidak diaudit) adalah 4 number of employees (unaudited) of 4
karyawan tahun 2025 dan 2024. in 2025 and 2024. Total consolidated
Jumlah rata- rata karyawan average number of employees of the
konsolidasi grup (tidak diaudit) adalah Group (unaudited) was 5 dan 9 in 2025
5 dan 9 karyawan tahun 2025 dan and 2024.
2024.
2. IKHTISAR KEBIJAKAN AKUNTANSI 2. SUMMARY OF SIGNIFICANT
DAN PELAPORAN KEUANGAN ACCOUNTING AND FINANCIAL
PENTING REPORTING POLICIES
a. Dasar Penyusunan dan a. Basis of Consolidated Financial
Pengukuran Laporan Keuangan Statements Preparation and
Konsolidasian Measurement
Laporan keuangan konsolidasian The consolidated financial statements
disusun dan disajikan dengan have been prepared and presented in
menggunakan Standar Akuntansi accordance with Indonesian Financial
Keuangan (SAK) di Indonesia, Accounting Standards (SAK), which
meliputi pernyataan dan interpretasi comprise the statements and
yang diterbitkan oleh Dewan Standar interpretations issued by the Board of
Akuntansi Keuangan Ikatan Akuntan Financial Accounting Standards of the
Indonesia (IAI) dan Dewan Standar Institute of Indonesia Chartered
Akuntansi Syariah IAI dan peraturan Accountants (IAI) and the Board of
regulator pasar modal, dan Sharia Accounting Standards of IAI and
Peraturan OJK No.VIII.G.7 tentang OJK Regulation No. VIII.G.7 regarding
“Penyajian dan Pengungkapan “Presentation and Disclosures of Public
Laporan Keuangan Emiten atau Companies’ Financial Statements”.
Perusahaan Publik”.
Dasar pengukuran laporan keuangan The measurement basis used is the
konsolidasian ini adalah konsep biaya historical cost, except for certain
perolehan, kecuali beberapa akun accounts which are measured on the
tertentu disusun berdasarkan bases described in the related
pengukuran lain, sebagaimana accounting policies. The consolidated
diuraikan dalam kebijakan akuntansi financial statements, except for the
masing-masing akun tersebut. consolidated statements of cash flows,
Laporan keuangan konsolidasian ini are prepared under the accrual basis of
disusun dengan metode akrual, accounting.
kecuali arus kas.
Laporan arus kas konsolidasian The consolidated statements of cash
disusun dengan menggunakan flows are prepared using the direct
metode langsung dengan method with classifications of cash
mengelompokkan arus kas dalam flows into operating, investing, and
aktivitas operasi, investasi, dan financing activities.
pendanaan.
- 15 -
Page 27
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
2. IKHTISAR KEBIJAKAN AKUNTANSI 2. SUMMARY OF SIGNIFICANT
DAN PELAPORAN KEUANGAN ACCOUNTING AND FINANCIAL
PENTING (Lanjutan) REPORTING POLICIES (Continued)
a. Dasar Penyusunan dan a. Basis of Consolidated Financial
Pengukuran Laporan Keuangan Statements Preparation and
Konsolidasian (Lanjutan) Measurement (Continued)
Kebijakan akuntansi yang diterapkan The accounting policies adopted in the
dalam penyusunan laporan keuangan preparation of the consolidated financial
konsolidasian untuk tahun yang statements for the year ended
berakhir 31 Desember 2025 adalah December 31, 2025 are consistent with
konsisten dengan kebijakan akuntansi those adopted in the preparation of the
yang diterapkan dalam penyusunan consolidated financial statements for the
laporan keuangan konsolidasian untuk year ended December 31, 2024.
tahun yang berakhir 31 Desember
2024.
Mata uang yang digunakan dalam The currency used in the preparation
penyusunan dan penyajian laporan and presentation of the consolidated
keuangan konsolidasian adalah mata financial statements is the Indonesian
uang Rupiah (Rp) yang juga Rupiah (Rp) which is also the functional
merupakan mata uang fungsional currency of the Company.
Perusahaan.
b. Prinsip Konsolidasi b. Basis of Consolidated
Laporan keuangan konsolidasian The consolidated financial statements
meliputi laporan keuangan incorporate the financial statements of
Perusahaan dan entitas-entitas the Company and entities (including
(termasuk entitas terstruktur) yang structured entities) controlled by the
dikendalikan oleh Perusahaan dan Company and Its subsidiaries (the
entitas anak (Grup). Pengendalian Group). Control is achieved when the
diperoleh apabila Grup memiliki Group has all the following:
seluruh hal berikut ini:
Kekuasaan atas investee; Power over the investee;
Eksposur atau hak atas imbal Is exposed, or has rights, to variable
hasil variabel dari keterlibatannya returns from its involvement with the
dengan investee, dan investee; and
Kemampuan untuk menggunakan The ability to use its power to affect
kekuasaannya atas investee its return.
untuk mempengaruhi jumlah
imbal hasil Grup.
- 16 -
Page 28
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
2. IKHTISAR KEBIJAKAN AKUNTANSI 2. SUMMARY OF SIGNIFICANT
DAN PELAPORAN KEUANGAN ACCOUNTING AND FINANCIAL
PENTING (Lanjutan) REPORTING POLICIES (Continued)
b. Prinsip Konsolidasi (Lanjutan) b. Basis of Consolidated (Continued)
Pengkonsolidasian entitas anak Consolidation of a subsidiary begins
dimulai pada saat Grup memperoleh when the Group obtains control over the
pengendalian atas entitas anak dan subsidiary and ceases when the Group
berakhir pada saat Grup kehilangan losses control of the subsidiary.
pengendalian atas entitas anak. Specifically, income and expenses of a
Secara khusus, penghasilan dan subsidiary acquired or disposed of
beban entitas anak yang diakuisisi during the year are included in the
atau dilepaskan selama tahun berjalan consolidated statement of profit or loss
termasuk dalam laporan laba rugi dan and other comprehensive income from
penghasilan komprehensif lain the date the Group gains control until
konsolidasian sejak tanggal Grup the date when the Group ceases to
memperoleh pengendalian sampai control the subsidiary.
dengan tanggal Grup kehilangan
pengendalian atas entitas anak.
Seluruh aset dan liabilitas, ekuitas, All intragroup assets and liabilities,
penghasilan, beban dan arus kas equity, income, expenses and cash
dalam intra kelompok usaha terkait flows relating to transactions between
dengan transaksi antar entitas dalam members of the Group are eliminated in
Grup dieliminasi secara penuh dalam full on consolidation.
laporan keuangan konsolidasian.
Laba rugi dan setiap komponen Profit or loss and each component of
penghasilan komprehensif lain other comprehensive income are
diatribusikan kepada pemilik attributed to the owners of the Company
Perusahaan dan kepentingan and to the non- controling interest (NCI)
nonpengendali (KNP) meskipun hal even if this results in the NCI having a
tersebut mengakibatkan KNP memiliki deficit balance.
saldo defisit.
KNP disajikan dalam laporan laba rugi NCI are presented in the consolidated
dan penghasilan komprehensif lain statement of profit or loss and other
konsolidasian dan dalam ekuitas pada comprehensive income and under the
laporan posisi keuangan equity section of the consolidated
konsolidasian, terpisah dari bagian statement of financial position,
yang dapat diatribusikan kepada separately from the corresponding
pemilik Perusahaan. portion attributable to owners of the
Company.
Transaksi dengan KNP yang tidak Transactions with NCI that do not result
mengakibatkan hilangnya in loss of control are accounted for as
pengendalian dicatat sebagai equity transactions. The difference
transaksi ekuitas. Selisih antara nilai between the fair value of any
wajar imbalan yang dialihkan dengan consideration paid and the relevant
bagian relatif atas nilai tercatat aset share acquired of the carrying value of
bersih entitas anak yang diakuisisi net assets of the subsidiary is recorded
dicatat di ekuitas. Keuntungan atau in equity. Gains or losses on disposals
kerugian dari pelepasan kepada KNP to NCI are also recorded in equity.
juga dicatat di ekuitas.
- 17 -
Page 29
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
2. IKHTISAR KEBIJAKAN AKUNTANSI 2. SUMMARY OF SIGNIFICANT
DAN PELAPORAN KEUANGAN ACCOUNTING AND FINANCIAL
PENTING (Lanjutan) REPORTING POLICIES (Continued)
b. Prinsip Konsolidasi (Lanjutan) b. Basis of Consolidated (Continued)
Jika kehilangan pengendalian atas In case of loss of control over a
entitas anak, maka Grup: subsidiary, the Group:
Menghentikan pengakuan aset Derecognizes the assets (including
(termasuk setiap goodwill) dan goodwill) and liabilities of the
liabilitas entitas anak; subsidiary;
Menghentikan pengakuan jumlah Derecognizes the carrying amount
tercatat setiap KNP; of any NCI;
Menghentikan pengakuan Derecognizes the cumulative
akumulasi selisih penjabaran, translation differences, recorded in
yang dicatat di ekuitas, bila ada; equity, if any;
Mengakui nilai wajar Recognizes the fair value of the
pembayaran yang diterima; consideration received;
Mengakui setiap sisa investasi Recognizes the fair value of any
pada nilai wajarnya; investment retained;
Mengakui setiap perbedaan Recognizes any surplus or deficit in
yang dihasilkan sebagai profit or loss; and
keuntungan atau kerugian dalam
laba rugi; dan
Mereklasifikasi bagian entitas Reclassifies the parent’s share of
induk atas komponen yang components previously recognized
sebelumnya diakui sebagai in other comprehensive income to
penghasilan komprehensif lain profit or loss or retained earnings,
ke laba rugi, atau mengalihkan as appropriate.
secara langsung ke saldo laba.
c. Kombinasi Bisnis c. Business Combination
Perusahaan dan Entitas Anak The Company and Subsidiaries have
melakukan kombinasi bisnis business combination as defined under
sebagaimana didefinisikan dalam PSAK No. 103, “Business Combination”.
PSAK No. 103, "Kombinasi Bisnis".
Kombinasi bisnis, kecuali kombinasi Business combinations, except
bisnis entitas sepengendali, dicatat business combination among entities
dengan menggunakan metode under common control, are accounted
akuisisi. Biaya perolehan dari sebuah for using the acquisition method. The
akuisisi diukur pada nilai agregat cost of an acquisition is measured as
imbalan yang dialihkan, diukur pada the aggregate of the consideration
nilai wajar pada tanggal akuisisi dan transferred, measured at acquisition
jumlah setiap KNP pada pihak yang date fair value and the amount of any
diakuisisi. Untuk setiap kombinasi NCI in the acquiree. For each business
bisnis, pihak pengakuisisi mengukur combination, the acquirer measures the
KNP pada entitas yang diakuisisi pada NCI in the acquiree either at fair value
nilai wajar atau sebesar proporsi or at the proportionate share of the
kepemilikan KNP atas aset neto yang acquiree’s identifiable net assets.
teridentifikasi dari entitas yang Acquisition related costs incurred are
diakuisisi. Biaya-biaya akuisisi yang directly expensed as incurred.
timbul dibebankan langsung dan
disajikan sebagai beban administrasi.
- 18 -
Page 30
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
2. IKHTISAR KEBIJAKAN AKUNTANSI 2. SUMMARY OF SIGNIFICANT
DAN PELAPORAN KEUANGAN ACCOUNTING AND FINANCIAL
PENTING (Lanjutan) REPORTING POLICIES (Continued)
c. Kombinasi Bisnis (Lanjutan) c. Business Combination (Continued)
Ketika melakukan akuisisi atas When the Group acquires a business, it
sebuah bisnis, Grup assesses the financial assets acquired
mengklasifikasikan dan menentukan and liabilities assumed for appropriate
aset keuangan yang diperoleh dan classification and designation in
liabilitas keuangan yang diambil alih accordance with the contractual terms,
berdasarkan pada persyaratan economic circumstances and pertinent
kontraktual, kondisi ekonomi dan conditions as of the acquisition date.
kondisi terkait lain yang ada pada
tanggal akuisisi.
Dalam suatu kombinasi bisnis yang If the business combination is achieved
dilakukan secara bertahap, pada in stages, the acquisition date fair value
tanggal akuisisi pihak pengakuisisi of the acquirer’s previously held equity
mengukur kembali nilai wajar interest in the acquiree is remeasured to
kepentingan ekuitas yang dimiliki fair value at the acquisition date through
sebelumnya pada pihak yang profit or loss.
diakuisisi dan mengakui keuntungan
atau kerugian yang dihasilkan dalam
laba rugi.
Pada tanggal akuisisi, goodwill At acquisition date, goodwill is initially
awalnya diukur pada harga perolehan measured at cost being the excess of
yang merupakan selisih lebih nilai the aggregate of the consideration
agregat dari imbalan yang dialihkan transferred and the amount recognized
dan jumlah yang diakui untuk KNP for NCI over the net identifiable assets
atas aset bersih teridentifikasi yang acquired and liabilities assumed. If this
diperoleh dan liabilitas yang diambil consideration is lower than the fair value
alih. Jika nilai agregat tersebut lebih of the net assets of the subsidiary
kecil dari nilai wajar aset neto entitas acquired, the difference recognized in
anak yang diakuisisi, selisih tersebut profit or loss.
diakui dalam laba rugi.
Setelah pengakuan awal, goodwill After initial recognition, goodwill is
diukur pada jumlah tercatat dikurangi measured at cost less any accumulated
akumulasi kerugian penurunan nilai. impairment losses. For the purpose of
Untuk tujuan uji penurunan nilai, impairment testing, goodwill acquired in
goodwill yang diperoleh dari suatu a business combination is, from the
kombinasi bisnis, sejak tanggal acquisition date, allocated to each of the
akuisisi, dialokasikan kepada setiap Company and/or its subsidiaries’ cash-
Unit Penghasil Kas (“UPK”) dari generating units (“CGU”) that are
Perusahaan dan/atau entitas anak expected to benefit from the
yang diharapkan akan menerima combination, irrespective of whether
manfaat dari sinergi kombinasi other assets or liabilities of the acquired
tersebut, terlepas dari apakah aset are assigned to those CGUs.
atau liabilitas lain dari pihak yang
diakuisisi dialokasikan ke UPK
tersebut.
- 19 -
Page 31
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
2. IKHTISAR KEBIJAKAN AKUNTANSI 2. SUMMARY OF SIGNIFICANT
DAN PELAPORAN KEUANGAN ACCOUNTING AND FINANCIAL
PENTING (Lanjutan) REPORTING POLICIES (Continued)
c. Kombinasi Bisnis (Lanjutan) c. Business Combination (Continued)
Jika goodwill telah dialokasikan pada Where goodwill forms part of a CGU
suatu UPK dan operasi tertentu atas and part of the operation within that
UPK tersebut dihentikan, maka CGU is disposed of, the goodwill
goodwill yang diasosiasikan dengan associated with the operation disposed
operasi yang dihentikan tersebut of is included in the carrying amount of
termasuk dalam jumlah tercatat the operation when determining the gain
operasi tersebut ketika menentukan or loss on disposal of the operation.
keuntungan atau kerugian dari Goodwill disposed of in this
pelepasan. Goodwill yang dilepaskan circumstance is measured based on the
tersebut diukur berdasarkan nilai relative values of the operation disposed
relatif operasi yang dihentikan dan of and the portion of the CGU retained.
porsi UPK yang ditahan.
d. Penjabaran Mata Uang Asing d. Foreign Currency Translation
Mata Uang Fungsional dan Functional and Reporting Currencies
Pelaporan
Akun-akun yang tercakup dalam Items included in the financial
laporan keuangan setiap entitas statements of each of the Group‟s
dalam Grup diukur menggunakan companies are measured using the
mata uang dari lingkungan ekonomi currency of the primary economic
utama dimana entitas beroperasi environment in which the entity operates
(mata uang fungsional). (the functional currency).
Laporan keuangan disajikan dalam The consolidated financial statements
Rupiah, yang merupakan mata uang are presented in Rupiah which is the
fungsional Perusahaan dan mata Company‟s functional and the Group‟s
uang penyajian Grup. presentation currency.
Transaksi dan Saldo Transactions and Balances
Transaksi dalam mata uang asing Foreign currency transactions are
dijabarkan kedalam mata uang translated into the functional currency
fungsional menggunakan kurs pada using the exchange rates prevailing at
tanggal transaksi. Keuntungan atau the dates of the transactions. Foreign
kerugian selisih kurs yang timbul dari exchange gains and losses resulting
penyelesaian transaksi dan dari from the settlement of such
penjabaran pada kurs akhir tahun atas transactions and from the translation at
aset dan liabilitas moneter dalam year end exchange rates of monetary
mata uang asing diakui dalam laba assets and liabilities denominated in
rugi. foreign currencies are recognized in the
profit or loss.
- 20 -
Page 32
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
2. IKHTISAR KEBIJAKAN AKUNTANSI 2. SUMMARY OF SIGNIFICANT
DAN PELAPORAN KEUANGAN ACCOUNTING AND FINANCIAL
PENTING (Lanjutan) REPORTING POLICIES (Continued)
d. Penjabaran Mata Uang Asing d. Foreign Currency Translation
l(Lanjutan) aaa;(Continued)
Transaksi dan Saldo (Lanjutan) Transactions and Balances
(Continued)
Aset nonmoneter yang diukur pada assets that are measured at fair value
nilai wajar dijabarkan menggunakan are translated using the exchange rate
kurs pada tanggal nilai wajar at the date that the fair value was
ditentukan. Selisih penjabaran akun determined. Translation differences on
ekuitas dan akun nonmoneter serupa equities and similar non-monetary items
yang diukur pada nilai wajar diakui measured at fair value are recognized in
dalam laba rugi. profit or loss.
Pada tanggal 31 Desember 2025 dan As of December 31, 2025 and 2024, the
2024, kurs konversi berdasarkan kurs conversion rates used by the Company
tengah Bank Indonesia yang based on the middle rates of Bank
digunakan oleh Perusahaan adalah Indonesia was 1 United States Dollar
sebesar Rp 16.782 dan Rp 16.162 per equivalents to Rp 16,782 and
1 Dolar Amerika Serikat. Rp 16,162, respectively.
e. Transaksi dengan Pihak-pihak e. Transactions with Related Parties
Berelasi
Orang atau entitas dikategorikan A person or entity is considered a
sebagai pihak berelasi Perusahaan related party of the Company if it meets
apabila memenuhi definisi pihak the definition of a related party in PSAK
berelasi berdasarkan PSAK No. 224 No. 224 “Related Party Disclosures”.
“Pengungkapan Pihak-pihak Berelasi".
Semua transaksi signifikan dengan All significant transactions with related
pihak berelasi telah diungkapkan parties are disclosed in the consolidated
dalam laporan keuangan financial statements.
konsolidasian.
f. Klasifikasi Lancar dan Tidak Lancar f. Current and Non-current
Classification
Grup menyajikan aset dan liabilitas The Group presents assets and
dalam laporan posisi keuangan liabilities in the consolidated statement
konsolidasian berdasarkan klasifikasi of financial position based on
lancar/tidak lancar. Suatu aset current/non-current classification. An
disajikan lancar bila: asset is current when it is:
a. akan direalisasi, dijual atau a. expected to be realized or intended
dikonsumsidalam siklus operasi to be sold or consumed in the normal
normal, operating cycle,
b. untuk diperdagangkan, atau b. held primarily for the purpose of
trading, or
- 21 -
Page 33
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
2. IKHTISAR KEBIJAKAN AKUNTANSI 2. SUMMARY OF SIGNIFICANT
DAN PELAPORAN KEUANGAN ACCOUNTING AND FINANCIAL
PENTING (Lanjutan) REPORTING POLICIES (Continued)
f. Klasifikasi Lancar dan Tidak Lancar f. Current and Non-current
(Lanjutan) Classification (Continued)
c. akan direalisasi dalam 12 bulan c. expected to be realized within 12
setelah tanggal pelaporan, atau months after the reporting period, or
kas atau setara kas, kecuali yang cash or cash equivalents unless
dibatasi penggunaannya atau restricted from being exchanged or
akan digunakan untuk melunasi used to settle a liability for at least 12
suatu liabilitas dalam paling months after the reporting period.
lambat 12 bulan setelah tanggal
pelaporan.
Seluruh aset lain diklasifikasikan All other assets are classified as
sebagai tidak lancar. noncurrent.
Suatu liabilitas disajikan jangka A liability is current when it is:
pendek bila:
Suatu liabilitas disajikan jangka A liability is current when it is:
pendek bila:
a. akan dilunasi dalam siklus operasi a. expected to be settled in the normal
normal, operating cycle,
b. untuk diperdagangkan, b. held primarily to the purpose of
trading,
c. akan dilunasi dalam 12 bulan c. due to be settled within 12 months
setelah tanggal pelaporan, atau after the reporting period, or
d. tidak ada hak pada akhir periode d. there is no right at the end of the
pelaporan untuk menangguhkan reporting period to defer the
pelunasannya dalam paling tidak settlement of the liability for at least
12 bulan setelah tanggal 12 months after the reporting period.
pelaporan.
Seluruh liabilitas lain diklasifikasikan All other liabilities are classified as
sebagai jangka panjang. noncurrent.
g. Kas dan Setara Kas g. Cash and Cash Equivalents
Kas terdiri dari kas dan bank. Setara Cash consists of cash on hand and in
kas adalah semua investasi yang banks. Cash equivalents are short-term,
bersifat jangka pendek dan sangat highly liquid investments that are readily
likuid yang dapat segera convertible to known amounts of cash
dikonversikan menjadi kas dengan with original maturities of 3 (three)
jatuh tempo dalam waktu 3 (tiga) months or less from the date of
bulan atau kurang sejak tanggal placements, and which are not used as
penempatannya, dan yang tidak collateral and are not restricted.
dijaminkan serta tidak dibatasi
pencairannya.
- 22 -
Page 34
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
2. IKHTISAR KEBIJAKAN AKUNTANSI 2. SUMMARY OF SIGNIFICANT
DAN PELAPORAN KEUANGAN ACCOUNTING AND FINANCIAL
PENTING (Lanjutan) REPORTING POLICIES (Continued)
g. Kas dan Setara Kas g. Cash and Cash Equivalents
Deposito berjangka yang jatuh Time deposits with maturities of 3
temponya kurang dari 3 (tiga) bulan (three) months or less from the date of
pada saat penempatan namun placement which are used as collateral
dijaminkan, atau dibatasi or are restricted, and time deposits with
pencairannya, dan deposito berjangka maturities of more than 3 (three) months
yang jatuh temponya lebih dari 3 (tiga) from the date of placement are
bulan pada saat penempatan presented as “Short-term investments”.
disajikan sebagai “Investasi jangka
pendek”.
h. Instrumen Keuangan h. Financial Assets
Grup menerapkan PSAK No. 109, The Group has applied PSAK No. 109,
Instrumen Keuangan, mengenai Financial Instruments, which set the
pengaturan instrumen keuangan requirements in classification and
terkait klasifikasi dan pengukuran, measurement, impairment in value of
penurunan nilai atas instrumen financial assets and hedging
keuangan dan akuntansi lindung nilai. accounting.
Aset Keuangan Financial Assets
Grup mengklasifikasikan aset The Group classifies its financial assets
keuangan sesuai dengan PSAK in accordance with PSAK No. 109,
No. 109, Instrumen Keuangan, Financial Instruments, that classifies
sehingga setelah pengakuan awal financial assets as subsequently
aset keuangan diukur pada biaya measured at amortized cost, fair value
perolehan diamortisasi, nilai wajar through comprehensive income or fair
melalui penghasilan komprehensif lain value through profit or loss, on the basis
atau nilai wajar melalui laba rugi, of both:
denga menggunakan dua dasar,
yaitu:
a. Model bisnis Grup dalam a. The Group’s business model for
mengelola aset keuangan; dan managing the financial assets; and
b. Karakteristik arus kas kontraktual b. The contractual cash flow
dari aset keuangan. characteristics of the financial
assets.
Pada tanggal 31 Desember 2025 dan As of December 31, 2025 and 2024, the
2024, Grup hanya memiliki instrumen Group has financial instruments under
keuangan dalam kategori aset category financial assets at amortized
keuangan pada biaya perolehan cost.
diamortisasi.
- 23 -
Page 35
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
2. IKHTISAR KEBIJAKAN AKUNTANSI 2. SUMMARY OF SIGNIFICANT
DAN PELAPORAN KEUANGAN ACCOUNTING AND FINANCIAL
PENTING (Lanjutan) REPORTING POLICIES (Continued)
h. Instrumen Keuangan (Lanjutan) h. Financial Assets (Continued)
Aset Keuangan (Lanjutan) Financial Assets (Continued)
Aset keuangan pada biaya perolehan Financial assets at amortized cost
diamortisasi
Aset keuangan diukur pada biaya A financial asset shall be measured at
perolehan diamortisasi jika kedua amortized cost if both of the following
kondisi berikut terpenuhi: conditions are met:
a) Aset keuangan dikelola dalam a) The financial assets is held within
model bisnis yang bertujuan untuk a business model whose objective
memiliki aset keuntungan dalam is to hold financial assets in order
rangka mendapatkan arus kas to collect contractual cash flows;
kontraktual; dan and
b) Persyaratan kontraktual dari aset b) The contractual terms of the
keuangan menghasilkan arus kas financial assets give rise on
pada tanggal tertentu yang semata specified dates to cash flows that
dari pembayaran pokok dan bunga are solely payments of principal
dari jumlah pokok terutang. amount outstanding.
Aset keuangan pada biaya perolehan Financial assets at amortized cost is
diamortisasi diukur pada jumlah yang measured at initial amount minus the
diakui saat pengakuan awal dikurangi principal repayments, plus or minus the
pembayaran pokok, ditambah atau cumulative amortization using the
dikurangi dengan amortisasi kumulatif effective interest method of any
menggunakan metode suku bunga difference between that initial amount
efektif yang dihitung dari selisih and the maturity amount, adjusted for
antara nilai awal dan nilai jatuh allowance for impairment.
temponya, dan dikurangi dengan
cadangan kerugian penurunan nilai.
Pada tanggal 31 Desember 2025 dan As of December 31, 2025 and 2024, the
2024, kategori ini meliputi kas dan Group’s cash and cash equivalents,
setara kas, piutang usaha, piutang trade, accounts receivables, other
lain-lain, aset lancar lainnya serta accounts receivables, other current
jaminan yang termasuk dalam akun asssets and security deposits included
aset lain-lain yang dimiliki oleh Grup. in other assets account are included in
this category.
- 24 -
Page 36
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
2. IKHTISAR KEBIJAKAN AKUNTANSI 2. SUMMARY OF SIGNIFICANT
DAN PELAPORAN KEUANGAN ACCOUNTING AND FINANCIAL
PENTING (Lanjutan) REPORTING POLICIES (Continued)
h. Instrumen Keuangan (Lanjutan) h. Financial Assets (Continued)
Liabilitas Keuangan dan Instrumen Financial Liabilities and Equity
Ekuitas Instruments
Liabilitas keuangan dan instrumen Financial liabilities and equity
ekuitas Grup diklasifikasikan instruments of the Group are classified
berdasarkan substansi perjanjian according to the substance of the
kontraktual serta definisi liabilitas contractual arrangements entered into
keuangan dan instrumen ekuitas. and the definitions of a financial liability
Kebijakan akuntansi yang diterapkan and equity instrument. The accounting
atas instrumen keuangan tersebut policies adopted for specific financial
diungkapkan berikut ini. instruments are set out below.
Instrumen Ekuitas Equity Instruments
Instrumen ekuitas adalah setiap An equity instrument is any contract that
kontrak yang memberikan hak evidences a residual interest in the
residual atas aset suatu entitas assets of an entity after deducting all of
setelah dikurangi dengan seluruh its liabilities. Equity instruments are
liabilitasnya. Instrumen ekuitas dicatat recorded at the proceeds received, net
sejumlah hasil yang diterima, setelah of direct issue costs.
dikurangkan dengan biaya penerbitan
langsung.
Liabilitas Keuangan Financial Liabilities
Liabilitas keuangan diklasifikasikan Financial liabilities are classified as
sebagai berikut: (i) liabilitas keuangan follows: (i) financial liabilities at
yang diukur dengan biaya amortized cost, or (ii) financial liabilities
diamortisasi, (ii) liabilitas keuangan at fair value through profit or loss
yang diukur dengan nilai wajar (FVPL). The Group determines the
melalui laba rugi. Grup menentukan classification of its financial liabilities at
klasifikasi liabilitas keuangan pada initial recognition.
saat pengakuan awal.
Seluruh liabilitas keuangan diakui All financial liabilities are recognized
pada awalnya sebesar nilai wajar dan, initially at fair value and, in the case of
dalam hal pinjaman dan utang, loans and borrowings, inclusive of
termasuk biaya transaksi yang dapat directly attributable transaction costs
diatribusikan secara langsung dan and subsequently measured at
selanjutnya diukur pada biaya amortized cost using the effective
perolehan diamortisasi dengan interest rate method. The amortization
menggunakan metode suku bunga of the effective interest rate is included
efektif. Amortisasi suku bunga efektif in finance costs in profit or loss.
disajikan sebagai bagian dari beban
keuangan dalam laba rugi.
- 25 -
Page 37
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
2. IKHTISAR KEBIJAKAN AKUNTANSI 2. SUMMARY OF SIGNIFICANT
DAN PELAPORAN KEUANGAN ACCOUNTING AND FINANCIAL
PENTING (Lanjutan) REPORTING POLICIES (Continued)
h. Instrumen Keuangan (Lanjutan) h. Financial Assets (Continued)
Liabilitas Keuangan (Lanjutan) Financial Liabilities (Continued)
Pada tanggal 31 Desember 2025 dan As of December 31, 2025 and 2024, the
2024, Grup memiliki instrumen Group has financial instruments under
keuangan dalam kategori liabilitas financial liabilities at amortized cost
keuangan yang diukur pada biaya category.
perolehan diamortisasi.
Liabilitas Keuangan yang Diukur pada Financial Liabilities at Amortized Cost
Biaya Perolehan Diamortisasi
Liabilitas keuangan pada biaya Financial liabilities at amortized cost is
perolehan diamortisasi diukur pada measured at initial amount minus the
jumlah yang diakui saat pengakuan principal repayments, plus or minus the
awal dikurangi pembayaran pokok, cumulative amortization using the
ditambah atau dikurangi dengan effective interest method of any
amortisasi kumulatif menggunakan difference between that initial amount
metode suku bunga efektif yang and the maturity amount.
dihitung dari selisih antara nilai awal
dan nilai jatuh temponya.
Pada tanggal 31 Desember 2025 dan As of December 31, 2025 and 2024, the
2024, kategori ini meliputi, utang bank Group’s, short-term bank loan, other
jangka pendek, beban akrual, utang accounts payable, accrued expenses,
lain-lain, dan utang pihak berelasi non and due to related parties are included
usaha yang dimiliki oleh Grup. in this category.
Saling Hapus Instrumen Keuangan Offsetting of Financial Instruments
Aset keuangan dan liabilitas Financial assets and liabilities are offset
keuangan saling hapus dan nilai and the net amount is reported in the
bersihnya disajikan dalam laporan consolidated statements of financial
posisi keuangan konsolidasian jika, position if, and only if, there is a
dan hanya jika, Grup saat ini memiliki currently enforceable right to offset the
hak yang berkekuatan hukum untuk recognized amounts and there is
melakukan saling hapus atas jumlah intention to settle on a net basis, or to
yang telah diakui tersebut; dan berniat realize the asset and settle the liability
untuk menyelesaikan secara neto simultaneously.
atau untuk merealisasikan aset dan
menyelesaikan liabilitasnya secara
simultan.
- 26 -
Page 38
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
2. IKHTISAR KEBIJAKAN AKUNTANSI 2. SUMMARY OF SIGNIFICANT
DAN PELAPORAN KEUANGAN ACCOUNTING AND FINANCIAL
PENTING (Lanjutan) REPORTING POLICIES (Continued)
h. Instrumen Keuangan (Lanjutan) h. Financial Assets (Continued)
Reklasifikasi Aset Keuangan Reclassifications of Financial Assets
Grup mereklasifikasi seluruh aset The Group reclassifies its financial
keuangan dalam kategori yang assets when, and only when, the Group
terpengaruh, jika dan hanya jika, Grup changes its business model for
mengubah model bisnis untuk managing financial assets. While, any
pengelolaan aset keuangan tersebut. financial liabilities shall not be
Sedangkan, liabilitas keuangan tidak reclassified.
direklasifikasi.
Penghentian Pengakuan Aset dan Derecognition of Financial Assets
Liabilitas Keuangan and Liabilities
1. Aset Keuangan 1. Financial Assets
Penghentian pengakuan atas A financial asset, or where
suatu aset keuangan, atau, bila applicable, a part of a financial
dapat diterapkan untuk bagian asset or part of a group of similar
dari aset keuangan atau bagian financial assets, is derecognized
dari kelompok aset keuangan when:
serupa, terjadi apabila:
a) Hak kontraktual atas arus a) The contractual rights to
kas yang berasal dari aset receive the cash flows from
keuangan tersebut berakhir these assets have ceased to
atau aset telah dialihkan; exist or the assets have been
transferred;
b) Hak kontraktual atas arus b) The contractual rights to
kas yang berasal dari aset receive the cash flows from
keuangan tersebut berakhir these assets have ceased to
atau aset telah dialihkan; exist or the assets have been
transferred;
c) Grup tetap memiliki hak c) A the Group retains the right
untuk menerima arus kas to receive cash flows from the
dari aset keuangan asset, but has assumed an
tersebut, namun juga obligation to pay them in full
menanggung kewajiban without material delay to a
kontraktual untuk third party under a “pass-
membayar kepada pihak through” arrangement; or
ketiga atas arus kas yang
diterima tersebut secara
penuh tanpa adanya
penundaan yang signifikan
berdasarkan suatu
kesepakatan; atau
- 27 -
Page 39
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
2. IKHTISAR KEBIJAKAN AKUNTANSI 2. SUMMARY OF SIGNIFICANT
DAN PELAPORAN KEUANGAN ACCOUNTING AND FINANCIAL
PENTING (Lanjutan) REPORTING POLICIES (Continued)
h. Instrumen Keuangan (Lanjutan) h. Financial Assets (Continued)
Penghentian Pengakuan Aset dan Derecognition of Financial Assets
Liabilitas Keuangan (Lanjutan) and Liabilities (Continued)
1. Aset Keuangan (Lanjutan) 1. Financial Assets (Continued)
d) Grup telah mentransfer d) the Group has transferred its
haknya untuk menerima rights to receive cash flows
arus kas dari aset from the asset and either (i)
keuangan dan (i) telah has transferred substantially
mentransfer secara all the risks and rewards of
substansial seluruh risiko the asset, or (ii) has neither
dan manfaat atas aset transferred nor retained
keuangan, atau (ii) secara substantially all the risks and
substansial tidak rewards of the asset, but has
mentransfer atau tidak transferred control of the
memiliki seluruh risiko dan asset.
manfaat atas aset
keuangan, namun telah
mentransfer pengendalian
atas aset keuangan
tersebut.
2. Liabilitas Keuangan 2. Financial Liabilities
Liabilitas keuangan dihentikan A financial liability is derecognized
pengakuannya jika liabilitas when the liability under the contract
keuangan tersebut berakhir, is discharged, cancelled or has
dibatalkan, atau telah expired.
kadaluarsa.
i. Pengukuran Nilai Wajar i. Fair Value Measurement
Sesuai PSAK No. 113, pengukuran Based on PSAK No. 113, the fair value
nilai wajar didasarkan pada asumsi measurement is based on the
bahwa transaksi untuk menjual aset presumption that the transaction to sell
atau mengalihkan liabilitas akan the asset or transfer the liability takes
terjadi: place either:
di pasar utama untuk aset atau in the principal market for the asset
liabilitas tersebut atau; or liability or;
jika tidak terdapat pasar utama, in the absence of a principal
di pasar yang paling market, in the most advantageous
menguntungkan untuk aset atau market for the asset or liability.
liabilitas tersebut.
- 28 -
Page 40
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
2. IKHTISAR KEBIJAKAN AKUNTANSI 2. SUMMARY OF SIGNIFICANT
DAN PELAPORAN KEUANGAN ACCOUNTING AND FINANCIAL
PENTING (Lanjutan) REPORTING POLICIES (Continued)
i. Pengukuran Nilai Wajar (Lanjutan) i. Fair Value Measurement (Continued)
Grup harus memiliki akses ke pasar The Group must have access to the
utama atau pasar yang paling principal or the most advantageous
menguntungkan pada tanggal market at the measurement date.
pengukuran.
Nilai wajar aset atau liabilitas diukur The fair value of an asset or a liability is
menggunakan asumsi yang akan measured using the assumptions that
digunakan pelaku pasar ketika market participants would use when
menentukan harga aset atau liabilitas pricing the asset or liability, assuming
tersebut, dengan asumsi bahwa that market participants act in their
pelaku pasar bertindak dalam economic best interest.
kepentingan ekonomi terbaiknya.
Pengukuran nilai wajar aset non- A fair value measurement of a non-
keuangan memperhitungkan financial asset takes into account a
kemampuan pelaku pasar untuk market participant’s ability to generate
menghasilkan manfaat ekonomik economic benefits by using the asset in
dengan menggunakan aset dalam its highest and best use or by selling it
penggunaan tertinggi dan terbaiknya, to another market participant that would
atau dengan menjualnya kepada use the asset in its highest and best
pelaku pasar lain yang akan use.
menggunakan aset tersebut dalam
penggunaan tertinggi dan terbaiknya.
Ketika Grup menggunakan teknik When the Group uses valuation
penilaian, maka Grup memaksimalkan techniques, it maximizes the use of
penggunaan input yang dapat relevant observable inputs and
diobservasi yang relevan dan minimizing the use of unobservable
meminimalkan penggunaan input inputs.
yang tidak dapat diobservasi.
- 29 -
Page 41
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
2. IKHTISAR KEBIJAKAN AKUNTANSI 2. SUMMARY OF SIGNIFICANT
DAN PELAPORAN KEUANGAN ACCOUNTING AND FINANCIAL
PENTING (Lanjutan) REPORTING POLICIES (Continued)
i. Pengukuran Nilai Wajar (Lanjutan) i. Fair Value Measurement (Continued)
Seluruh aset dan liabilitas yang All assets and liabilities for which fair
mana nilai wajar aset atau value is measured or disclosed in
liabilitas tersebut diukur atau the financial statements are
diungkapkan, dikategorikan categorized within the fair value
dalam hirarki nilai wajar sebagai hierarchy as follows:
berikut:
Level 1 - Harga kuotasian Level 1 - Quoted (unadjusted)
(tanpa penyesuaian) di pasar market prices in active markets for
aktif untuk aset atau liabilitas identical assets or liabilities;
yang identik;
Level 2 - Teknik penilaian Level 2 - Valuation techniques for
dimana level input terendah which the lowest level input that is
yang signifikan terhadap significant to the fair value
pengukuran nilai wajar dapat measurement is directly or
diobservasi, baik secara indirectly observable;
langsung maupun tidak
langsung;
Level 3 - Teknik penilaian Level 3 - Valuation techniques for
dimana level input terendah which the lowest level input that is
yang signifikan terhadap significant to the fair value
pengukuran nilai wajar tidak measurement is unobservable.
dapat diobservasi.
Untuk aset dan liabilitas yang diukur For assets and liabilities that are
pada nilai wajar secara berulang recognized in the financial statements
dalam laporan keuangan, maka Grup on a recurring basis, the Group
menentukan apakah telah terjadi determines whether there are transfers
transfer di antara level hirarki dengan between levels in the hierarchy by re-
menilai kembali pengkategorian level assessing categorization at the end of
nilai wajar pada setiap akhir periode each reporting period.
pelaporan.
j. Aset Tetap j. Fixed Assets
Perusahaan mencatat aset tetap The Company recorded property and
sebagaimana didefinisikan dalam equipment as defined under PSAK
PSAK No. 216, "Aset Tetap". No. 216, “Fixed Assets”.
Pemilik Langsung Direct Acquisition
Aset tetap kecuali tanah dan Fixed assets except land and buildings
bangunan dinyatakan berdasarkan are carried at cost, excluding day to day
biaya perolehan, tetapi tidak termasuk servicing, less accumulated
biaya perawatan sehari-hari, dikurangi depreciation and any impairment in
akumulasi penyusutan dan akumulasi value.
rugi penurunan nilai, jika ada.
- 30 -
Page 42
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
2. IKHTISAR KEBIJAKAN AKUNTANSI 2. SUMMARY OF SIGNIFICANT
DAN PELAPORAN KEUANGAN ACCOUNTING AND FINANCIAL
PENTING (Lanjutan) REPORTING POLICIES (Continued)
j. Aset Tetap (Lanjutan) j. Fixed Assets (Continued)
Tanah tidak disusutkan dan Land is not depreciated and is stated at
dinyatakan berdasarkan biaya cost less any impairment in value.
perolehan dikurangi akumulasi rugi
penurunan nilai.
Biaya perolehan awal aset tetap The initial cost of fixed assets consists
meliputi harga perolehan, termasuk of its purchase price, including import
bea impor dan pajak pembelian yang duties and taxes and any directly
tidak boleh dikreditkan dan biaya- attributable costs in bringing the
biaya yang dapat diatribusikan secara property and equipment to its working
langsung untuk membawa aset ke condition and location for its intended
lokasi dan kondisi yang diinginkan use.
sesuai dengan tujuan penggunaan
yang ditetapkan.
Beban-beban yang timbul setelah Expenditures incurred after the property
aset tetap digunakan, seperti beban and equipment have been put into
perbaikan dan pemeliharaan, operations, such as repairs and
dibebankan ke laba rugi pada saat maintenance costs, are normally
terjadinya. Apabila beban-beban charged to operations in the year such
tersebut menimbulkan peningkatan costs are incurred. In situations where it
manfaat ekonomis di masa datang can be clearly demonstrated that the
dari penggunaan aset tetap tersebut expenditures have resulted in an
yang dapat melebihi kinerja increase in the future economic benefits
normalnya, maka beban-beban expected to be obtained from the use of
tersebut dikapitalisasi sebagai the fixed assets beyond its originally
tambahan biaya perolehan aset tetap. assessed standard of performance, the
expenditures are capitalized as
additional costs of property and
equipment.
Penyusutan dihitung berdasarkan Depreciation is computed based on a
metode garis lurus (straight-line straight-line basis over the fixed
method) selama masa manfaat aset assets’s useful lives as follows:
tetap sebagai berikut:
Tahun/Years
Bangunan/Building 20
Kendaraan /Vehicles 4-8
Peralatan kantor /Office equipment 4
Nilai tercatat aset tetap ditelaah The carrying values of fixed assets are
kembali dan dilakukan penurunan nilai reviewed for impairment when events or
apabila terdapat peristiwa atau changes in circumstances indicate that
perubahan kondisi tertentu yang the carrying values may not be
mengindikasikan nilai tercatat tersebut recoverable.
tidak dapat dipulihkan sepenuhnya.
- 31 -
Page 43
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
2. IKHTISAR KEBIJAKAN AKUNTANSI 2. SUMMARY OF SIGNIFICANT
DAN PELAPORAN KEUANGAN ACCOUNTING AND FINANCIAL
PENTING (Lanjutan) REPORTING POLICIES (Continued)
j. Aset Tetap (Lanjutan) j. Fixed Assets (Continued)
Dalam setiap inspeksi yang signifikan, When each major inspection is
biaya inspeksi diakui dalam jumlah performed, its cost is recognized in the
tercatat aset tetap sebagai suatu carrying amount of the item of fixed
penggantian apabila memenuhi assets as a replacement if the
kriteria pengakuan. Biaya inspeksi recognition criteria are satisfied. Such
signifikan yang dikapitalisasi tersebut major inspection is capitalized and
diamortisasi selama periode sampai amortized over the next major
dengan saat inspeksi signifikan inspection activity.
berikutnya.
Jumlah tercatat aset tetap dihentikan An item of fixed assets is derecognized
pengakuannya pada saat dilepaskan upon disposal or when no future
atau tidak ada manfaat ekonomis economic benefits are expected from its
masa depan yang diharapkan dari use or disposal. Any gains or loss
penggunaan atau pelepasannya. arising from de-recognition of fixed
Keuntungan atau kerugian yang assets is included in profit or loss in the
timbul dari penghentian pengakuan year the item is derecognized.
aset tetap diakui dalam laba rugi pada
tahun terjadinya penghentian
pengakuan.
Nilai residu, umur manfaat, serta The fixed assets’s residual values, if
metode penyusutan dan amortisasi any, useful lives and depreciation and
ditelaah setiap akhir tahun dan amortization method are reviewed and
dilakukan penyesuaian apabila hasil adjusted if appropriate, at each financial
telaah berbeda dengan estimasi year end.
sebelumnya.
Aset Tetap Dalam Pembangunan Assets Under Construction
Aset tetap dalam pembangunan Assets under construction represents
merupakan aset dalam tahap fixed assets under construction which is
konstruksi, yang dinyatakan pada stated at cost and is not depreciated.
biaya perolehan dan tidak disusutkan. The accumulated costs will be
Akumulasi biaya akan direklasifikasi reclassified to the respective property
ke akun aset yang bersangkutan dan and equipment account and will be
akan disusutkan pada saat konstruksi depreciated when the construction is
selesai secara substansial dan aset substantially complete and the asset is
tersebut telah siap digunakan sesuai ready for its intended use.
tujuannya.
- 32 -
Page 44
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
2. IKHTISAR KEBIJAKAN AKUNTANSI 2. SUMMARY OF SIGNIFICANT
DAN PELAPORAN KEUANGAN ACCOUNTING AND FINANCIAL
PENTING (Lanjutan) REPORTING POLICIES (Continued)
k. Perjanjian Konsensi Jasa k. Service Concession Arrangement
EAS menerapkan ISAK 112 EAS applies ISAK 112 “Service
“Perjanjian Konsesi Jasa” atas Concession Arrangements” on its Power
Perjanjian Jual Beli Listrik (PPA) Purchase Agreement (PPA) with
dengan PT Perusahaan Listrik PT Perusahaan Listrik Negara (Persero)
Negara (Persero) (PLN). (PLN).
Perjanjian konsesi jasa adalah Service concession arrangements are
perjanjian dimana pemerintah atau arrangements whereby a government or
badan lainnya (pemberi konsesi) another body (the “grantor”) grants
memberikan kontrak untuk contracts for the supply of public
penyediaan layanan publik ke entitas services to a private sector entity (the
sektor swasta (“operator”). Perjanjian “operator”). This is often referred to as a
tersebut sering disebut sebagai 'public-to-private' arrangement.
perjanjian publik-ke-swasta.
Dalam perjanjian ini, operator In this type of arrangement, an operator
membangun infrastruktur yang akan constructs the infrastructure that will be
digunakan untuk menyediakan jasa used to provide the public service and
publik dan mengoperasikan serta operates and maintains that
mengelola infrastruktur tersebut untuk infrastructure for a specified period of
jangka waktu tertentu. Operator time. The operator is paid for the
dibayar untuk jasa yang dibayarkan services over the period of the
selama periode perjanjian. Perjanjian arrangement. A contract sets out
diatur oleh suatu kontrak yang performance standards, pricing
menetapkan standar kinerja, mechanisms, and arrangements for
mekanisme penyesuaian harga, dan arbitrating disputes. In some cases, the
pengaturan untuk menengahi operator may upgrade the existing
perselisihan. Dalam beberapa kasus, infrastructure.
operator dapat meningkatkan
infrastruktur yang ada.
Beberapa ciri umum dari perjanjian Some common features of service
konsesi jasa meliputi: concession arrangements include:
- Pemberi konsesi merupakan - The grantor is a public sector entity,
entitas sektor publik, termasuk including a governmental body, or a
badan pemerintah, atau entitas private sector entity to which the
sektor swasta yang telah responsibility for the service has
diberikan tanggung jawab atas been devolved.
layanan tersebut.
- Operator bertanggung jawab - The operator is responsible for at
setidaknya atas sebagian least some of the management of
pengelolaan infrastruktur dan the infrastructure and related
jasa terkait dan tidak hanya services and does not merely act as
bertindak sebagai agen atas an agent on behalf of the grantor.
kepentingan pemberi konsesi.
- 33 -
Page 45
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
2. IKHTISAR KEBIJAKAN AKUNTANSI 2. SUMMARY OF SIGNIFICANT
DAN PELAPORAN KEUANGAN ACCOUNTING AND FINANCIAL
PENTING (Lanjutan) REPORTING POLICIES (Continued)
k. Perjanjian Konsensi Jasa k. Service Concession Arrangement
(Lanjutan) (Continued)
- Kontrak menetapkan harga awal - The contract sets the initial prices to
yang akan dikenakan oleh be levied by the operator and
operator dan mengatur regulates price revisions over the
perubahan harga selama periode period of the service arrangement.
perjanjian jasa.
- Operator diwajibkan untuk - The operator is obligated to hand
menyerahkan infrastruktur over the infrastructure to the grantor
kepada pemberi konsesi pada in a specified condition at the end of
akhir periode perjanjian dalam the period of the arrangement, for
kondisi yang telah ditentukan, little or no incremental consideration
dengan sedikit atau tanpa irrespective of which party initially
imbalan tambahan, terlepas dari financed it.
pihak yang awalnya mendanai
infrastruktur.
Perjanjian Jual Beli Listrik (PPA) yang The Power Purchase Agreement (PPA)
diungkapkan pada Catatan 33 antara disclosed in Note 33 between PLN and
PLN dan EAS memenuhi definisi EAS meets the definition of a service
sebagai perjanjian konsesi jasa concession arrangement, where PLN
dimana PLN bertindak sebagai acts as a grantor and EAS acts as the
pemberi konsesi dan EAS bertindak operator. EAS agrees to design, finance,
sebagai operator. EAS setuju untuk construct, own and operate a mini hydro
merancang, membiayai, membangun, power generating facility (the
memiliki dan mengoperasikan fasilitas “infrastructure”) and sell to PLN the
pembangkit listrik tenaga mini hidro power generated therefrom on terms and
(“infrastruktur”) dan menjual kepada conditions as agreed in the PPA. The
PLN energi yang dihasilkan darinya infrastructure is used for its entire useful
dengan syarat dan kondisi life for the purpose of the service
sebagaimana disepakati dalam PPA. concession arrangement.
Infrastruktur digunakan untuk seluruh
masa manfaatnya untuk tujuan
pengaturan layanan konsesi.
Dalam ISAK 112 mengatur prinsip Under ISAK 112 determines the general
umum dalam pengakuan hak dan principles in the recognition and
kewajiban terkait dengan konsesi measurement of liabilities and rights
jasa, EAS tidak mengakui infrastruktur related to service concession, EAS does
sebagai aset tetap namun mengakui not recognize the infrastructure as
sebagai aset takberwujud, karena property and equipment but recognizes it
EAS tidak memiliki hak tanpa syarat as a intangible asset, as EAS has no
untuk menerima kas dari PLN melalui unconditional rights to receive cash from
pembayaran kapasitas berdasarkan PLN through the capacity payments
PPA. under the PPA.
ISAK 229 memberikan panduan ISAK 229 provides specific guidance for
spesifik mengenai pengungkapan the required disclosures regarding the
yang diperlukan atas perjanjian service concession agreement.
konsesi jasa.
- 34 -
Page 46
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
2. IKHTISAR KEBIJAKAN AKUNTANSI 2. SUMMARY OF SIGNIFICANT
DAN PELAPORAN KEUANGAN ACCOUNTING AND FINANCIAL
PENTING (Lanjutan) REPORTING POLICIES (Continued)
l. Goodwill l. Goodwill
Goodwill diuji penurunan nilainya Goodwill is tested annually for
setiap tahun dan dicatat sebesar impairment and carried at cost less
biaya perolehan dikurangi dengan accumulated impairment losses.
akumulasi penurunan nilai. Penurunan Impairment losses on goodwill are not
nilai goodwill tidak dapat dipulihkan. reversed. Gains and losses on the
Keuntungan atau kerugian yang diakui disposal of an entity include the carrying
pada saat pelepasan entitas anak amount of goodwill relating to the entity
harus memperhitungkan nilai tercatat sold.
goodwill dari entitas anak yang dijual
tersebut.
Goodwill dialokasikan ke UPK untuk Goodwill is allocated to CGU for the
tujuan uji penurunan nilai. Alokasi purpose of impairment testing. The
dilakukan ke UPK atau kelompok UPK allocation is made to those CGU or
yang diharapkan akan mendapat groups of CGU that are expected to
manfaat dari kombinasi bisnis yang benefit from the business combination in
menimbulkan goodwill tersebut. which the goodwill arose.
l. Aset Tak Berwujud l. Intangible Assets
Perangkat Lunak Software
Biaya yang dibayarkan atas layanan Costs incurred from the acquisition of
piranti lunak komputer ditangguhkan computer software and software service
dan diamortisasi menggunakan fee are deferred and are amortized
metode garis lurus selama periode using the straight-line method over the
perjanjian. term of the agreement.
m. Penurunan Nilai Aset Non- m. Impairment of Non-financial Assets
keuangan
Pada setiap akhir periode pelaporan The Group assesses at each annual
tahunan, Grup menelaah apakah reporting period whether there is an
terdapat indikasi suatu aset indication that an asset may be
mengalami penurunan nilai. Jika impaired. If any such indication exists,
terdapat indikasi tersebut atau pada or when annual impairment testing for
saat uji tahunan penurunan nilai aset an asset is required, the Group makes
perlu dilakukan, maka Grup membuat an estimate of the asset’s recoverable
estimasi jumlah terpulihkan aset amount.
tersebut.
Jika nilai tercatat aset lebih besar Where the carrying amount of an asset
daripada nilai terpulihkannya, maka exceeds its recoverable amount, the
aset tersebut dinyatakan mengalami asset is considered impaired and
penurunan nilai dan rugi penurunan impairment losses are recognized in
nilai diakui dalam laba rugi. profit or loss.
- 35 -
Page 47
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
2. IKHTISAR KEBIJAKAN AKUNTANSI 2. SUMMARY OF SIGNIFICANT
DAN PELAPORAN KEUANGAN ACCOUNTING AND FINANCIAL
PENTING (Lanjutan) REPORTING POLICIES (Continued)
n. Penurunan Nilai Aset Non- n. Impairment of Non-financial Assets
keuangan (Lanjutan) (Continued)
Dalam menghitung nilai pakai, In assessing the value in use, the
estimasi arus kas masa depan bersih estimated net future cash flows are
didiskontokan ke nilai kini dengan discounted to their present value using
menggunakan tingkat diskonto a pre-tax discount rate that reflects
sebelum pajak yang mencerminkan current market assessments of the time
penilaian pasar kini dari nilai waktu value of money and the risks specific to
uang dan risiko spesifik atas aset. the asset.
Penelaahan dilakukan pada akhir An assessment is made at each annual
setiap periode pelaporan tahunan reporting period as to whether there is
untuk mengetahui apakah terdapat any indication that previously
indikasi bahwa rugi penurunan nilai recognized impairment losses
aset yang telah diakui dalam periode recognized for an asset may no longer
sebelumnya mungkin tidak ada lagi exist or may have decreased. If such
atau mungkin telah menurun. Jika indication exists, the recoverable
indikasi dimaksud ditemukan, maka amount is estimated. A previously
Grup mengestimasi jumlah terpulihkan recognized impairment loss for an asset
aset tersebut. Kerugian penurunan is reversed in profit or loss to the extent
nilai yang diakui dalam periode that the carrying amount of the assets
sebelumnya akan dipulihkan apabila does not exceed its recoverable amount
nilai tercatat aset tidak melebihi nor exceed the carrying amount that
jumlah terpulihkannya maupun nilai would have been determined, net of
tercatat, neto setelah penyusutan, depreciation, had no impairment loss
seandainya tidak ada rugi penurunan been recognized for the asset in prior
nilai yang telah diakui untuk aset years. After such a reversal, the
tersebut pada tahun-tahun depreciation charge on the said asset is
sebelumnya. Setelah pemulihan adjusted in future periods to allocate the
tersebut, penyusutan aset tersebut asset’s revised carrying amount, less
disesuaikan di periode mendatang any residual value, on a systematic
untuk mengalokasikan nilai tercatat basis over its remaining useful life.
aset yang direvisi, dikurangi nilai
sisanya, dengan dasar yang
sistematis selama sisa umur
manfaatnya.
- 36 -
Page 48
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
2. IKHTISAR KEBIJAKAN AKUNTANSI 2. SUMMARY OF SIGNIFICANT
DAN PELAPORAN KEUANGAN ACCOUNTING AND FINANCIAL
PENTING (Lanjutan) REPORTING POLICIES (Continued)
o. Pengakuan Pendapatan dan Beban o. Revenue and Expense Recognition
Grup menerapkan PSAK No. 115 The Group has applied PSAK No. 115,
yang mensyaratkan pengakuan which requires revenue recognition to
pendapatan harus memenuhi 5 fulfill 5 steps of assessment:
langkah analisa sebagai berikut:
- Identifikasi kontrak dengan - Identify contract(s) with a
pelanggan. customer.
- Identifikasi kewajiban - Identify the performance
pelaksanaan dalam kontrak. obligations in the contract.
Kewajiban pelaksanaan Performance obligations are
merupakan janji-janji dalam promises in a contract to transfer to
kontrak untuk menyerahkan a customer goods or services that
barang atau jasa yang memiliki are distinct.
karakteristik berbeda ke
pelanggan.
- Penetapan harga transaksi. - Determine the transaction price.
Harga transaksi merupakan Transaction price is the amount of
jumlah imbalan yang berhak consideration to which an entity
diperoleh suatu entitas sebagai expects to be entitled in exchange
kompensasi atas diserahkannya for transferring promised goods or
barang atau jasa yang services to a customer. If the
dijanjikan ke pelanggan. Jika consideration promised in a
imbalan yang dijanjikan di contract includes a variable
kontrak mengandung suatu amount, the Group estimates the
jumlah yang bersifat variabel, amount of consideration to which it
maka Grup membuat estimasi expects to be entitled in exchange
jumlah imbalan tersebut for transferring the promised goods
sebesar jumlah yang or services to a customer less the
diharapkan berhak diterima atas estimated amount of service level
diserahkannya barang atau jasa guarantee which will be paid during
yang dijanjikan ke pelanggan the contract period.
dikurangi dengan estimasi
jumlah jaminan kinerja jasa
yang akan dibayarkan selama
periode kontrak.
- Alokasi harga transaksi ke - Allocate the transaction price to
setiap kewajiban pelaksanaan each performance obligation on the
dengan menggunakan dasar basis of the relative stand-alone
harga jual berdiri sendiri relatif selling prices of each distinct
dari setiap barang atau jasa goods or services promised in the
berbeda yang dijanjikan di contract. here these are not directly
kontrak. Ketika tidak dapat observable, the relative stand-
diamati secara langsung, harga alone selling price are estimated
jual berdiri sendiri relatif based on expected cost plus
diperkirakan berdasarkan biaya margin.
yang diharapkan ditambah
marjin.
- 37 -
Page 49
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
2. IKHTISAR KEBIJAKAN AKUNTANSI 2. SUMMARY OF SIGNIFICANT
DAN PELAPORAN KEUANGAN ACCOUNTING AND FINANCIAL
PENTING (Lanjutan) REPORTING POLICIES (Continued)
o. Pengakuan Pendapatan dan Beban o. Revenue and Expense Recognition
(Lanjutan) (Continued)
- Pengakuan pendapatan ketika - Recognize revenue when
kewajiban pelaksanaan telah performance obligation is satisfied
dipenuhi dengan menyerahkan by transferring a promised goods
barang atau jasa yang or services to a customer (which is
dijanjikan ke pelanggan (ketika when the customer obtains control
pelanggan telah memiliki of that goods or services).
pengendalian atas barang atau
jasa tersebut).
Kewajiban pelaksanaan dapat A performance obligation may be
dipenuhi dengan 2 cara, yakni: satisfied at the following:
a. Suatu titik waktu (umumnya a. Point in time (typically for
janji untuk menyerahkan barang promises to transfer goods to a
ke pelanggan); atau customer); or
b. Suatu periode waktu (umumnya b. Over time (typically for promises
janji untuk menyerahkan jasa ke to transfer service to a customer).
(pelanggan). Untuk kewajiban For a performance obligation
pelaksanaan yang dipenuhi satisfied over time, the Group
dalam suatu periode waktu, selects an appropriate measure of
Grup memilih ukuran progress to determine the amount
penyelesaian yang sesuai untuk of revenue that should be
penentuan jumlah pendapatan recognized as the performance
yang harus diakui karena telah obligation is satisfied.
terpenuhinya kewajiban
pelaksanaan.
Pendapatan diakui dari penjualan Revenue from sale arising from
yang timbul dari pergantian suku substitution for spare parts is
cadang diakui bila kepermilikan recognized when the control of the
persediaan telah pindah kepada goods have been passed to the buyer,
pembeli, bersamaan waktunya which generally coincide with the
dengan instalasinya. installation.
Pendapatan jasa diakui pada saat Revenue from services are recognized
jasa diberikan kepada pelanggan. when the services are rendered to
Pendapatan dari sewa diakui customers. Income from leases are
berdasarkan output yang dihasilkan recognized based on output which is
oleh peralatan panel surya. generated by solar panel equipment.
Beban diakui pada saat terjadinya Expenses are recognized when incurred
(accrual basis). (accrual basis).
- 38 -
Page 50
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
2. IKHTISAR KEBIJAKAN AKUNTANSI 2. SUMMARY OF SIGNIFICANT
DAN PELAPORAN KEUANGAN ACCOUNTING AND FINANCIAL
PENTING (Lanjutan) REPORTING POLICIES (Continued)
p. Biaya Pinjaman p. Borrowing Costs
Biaya pinjaman yang dapat Borrowing costs which are directly
diatribusikan secara langsung dengan attributable to the acquisition,
perolehan, konstruksi, atau construction, or production of qualifying
pembuatan aset kualifikasian assets are capitalized as part of the
dikapitalisasi sebagai bagian dari acquisition cost of the qualifying assets.
biaya perolehan aset tersebut. Biaya Other borrowing costs are recognized
pinjaman lainnya diakui sebagai as expense in the period in which they
beban pada saat terjadinya. are incurred.
Jika Grup meminjam dana secara To the extent that the Group borrows
khusus untuk tujuan memperoleh aset funds specifically for the purpose of
kualifikasian, maka entitas obtaining a qualifying asset, the entity
menentukan jumlah biaya pinjaman determines the amount of borrowing
yang layak dikapitalisasikan sebesar costs eligible for capitalization as the
biaya pinjaman aktual yang terjadi actual borrowing costs incurred on that
selama tahun berjalan dikurangi borrowing during the year less any
penghasilan investasi atas investasi investment income on the temporary
sementara dari pinjaman tersebut. investment of those borrowings.
Jika pengembangan aktif atas aset The Group suspends capitalization of
kualifikasian dihentikan, Grup borrowing costs during extended
menghentikan kapitalisasi biaya periods in which it suspends active
pinjaman selama periode yang development of a qualifying asset.
diperpanjang tersebut.
Kapitalisasi biaya pinjaman dihentikan The Group ceases capitalizing
saat selesainya secara subtansi borrowing costs when substantially all
seluruh aktivitas yang diperlukan the activities necessary to prepare the
untuk mempersiapkan aset qualifying asset for its intended use or
kualifikasian agar dapat digunakan sale are complete.
atau dijual sesuai dengan maksudnya.
q. Imbalan Kerja q. Employee Benefits
Liabilitas Imbalan Kerja Jangka Short-term Employee Benefits
Pendek Liability
Imbalan kerja jangka pendek diakui Short-term employee benefits are
sebesar jumlah yang tak-terdiskonto recognized at its undiscounted amount
sebagai liabilitas pada laporan posisi as a liability, after deducting any amount
keuangan konsolidasian setelah already paid, in the consolidated
dikurangi dengan jumlah yang telah statement of financial position and as an
dibayar dan sebagai beban dalam expense in profit or loss.
laba rugi.
- 39 -
Page 51
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
2. IKHTISAR KEBIJAKAN AKUNTANSI 2. SUMMARY OF SIGNIFICANT
DAN PELAPORAN KEUANGAN ACCOUNTING AND FINANCIAL
PENTING (Lanjutan) REPORTING POLICIES (Continued)
q. Imbalan Kerja (Lanjutan) q. Employee Benefits (Continued)
Liabilitas Imbalan Kerja Jangka Long-term Employee Benefits
Panjang Liability
Liabilitas imbalan kerja jangka Long-term employee benefits liability
panjang merupakan manfaat pasti represents post employment benefits,
yang dibentuk dengan pendanaan funded defined-benefit plans through a
khusus melalui program dana pensiun certain pension fund which amounts are
dan didasarkan pada masa kerja dan determined based on years of service
jumlah penghasilan karyawan pada and salaries of the employees at the
saat pensiun yang dihitung time of pension and calculated using the
menggunakan metode Projected Unit Projected Unit Credit.
Credit.
Pengukuran kembali liabilitas imbalan Remeasurement is reflected
pasti langsung diakui dalam laporan immediately in the consolidated
posisi keuangan konsolidasian dan statement of financial position with a
penghasilan komprehensif lain pada charge or credit recognized in other
periode terjadinya dan tidak akan comprehensive income in the period in
direklasifikasi ke laba rugi, namun which they occur and not to be
menjadi bagian dari saldo laba. Biaya reclassified to profit or loss but reflected
liabilitas imbalan pasti lainnya terkait immediately in retained earnings. All
dengan program imbalan pasti diakui other costs related
dalam laba rugi. to the defined-benefit plan are
recognized in profit or loss.
Pada tanggal 2 Februari 2021, On February 2, 2021, the Government
Pemerintah mengundangkan dan promulgated Government Regulation
memberlakukan Peraturan Number 35 Year 2021 (PP 35/2021) to
Pemerintah Nomor 35 Tahun 2021 implement the provisions of Article 81
(PP 35/2021) untuk melaksanakan and Article 185 (b) of Law No. 11/2020
ketentuan Pasal 81 dan Pasal 185 (b) concerning Job Creation (Cipta Kerja),
UU No. 11/2020 mengenai Cipta Kerja which aims to create the widest possible
yang bertujuan untuk menciptakan employment opportunities.
lapangan kerja yang seluas-luasnya.
Presiden Republik Indonesia telah The President of the Republic of
menetapkan Peraturan Pemerintah Indonesia has issued Government
Pengganti Undang-Undang No. 2 Regulation in Lieu of Law No. 2 of 2022
Tahun 2022 tentang Cipta Kerja concerning Job Creation (Perppu Cipta
(Perppu Cipta Kerja 2/2022) pada Kerja 2/2022) on December 30, 2022
tanggal 30 Desember 2022 yang which is the implementation of the
merupakan pelaksanaan dari Putusan Constitutional Court Decision Number
MK Nomor 91/PUU-XVIII/2020. 91/PUU-XVIII/2020.
- 40 -
Page 52
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
2. IKHTISAR KEBIJAKAN AKUNTANSI 2. SUMMARY OF SIGNIFICANT
DAN PELAPORAN KEUANGAN ACCOUNTING AND FINANCIAL
PENTING (Lanjutan) REPORTING POLICIES (Continued)
q. Imbalan Kerja (Lanjutan) q. Employee Benefits (Continued)
Dengan berlakunya Perppu ini, UU With the enactment of this Perppu, Law
No. 11/2020 tentang Cipta Kerja No. 11/2020 concerning Job Creation is
dicabut dan dinyatakan tidak berlaku. repealed and declared invalid. Perppu
Perppu Cipta Kerja 2/2022 telah Cipta Kerja 2/2022 has been enacted
ditetapkan menjadi Undang-Undang into Law on March 31, 2023, based on
pada tanggal 31 Maret 2023 Law No. 6 of 2023.
berdasarkan Undang-Undang No. 6
Tahun 2023.
Liabilitas Imbalan Kerja Jangka Long-term Employee Benefits
Panjang (Lanjutan) Liability (Continued)
Penyisihan dihitung dengan The provision has been calculated by
membandingkan manfaat yang akan comparing the benefit that will be
diterima oleh karyawan pada umur received by an employee at normal
wajar pensiun dari dana pensiun pension age from the pension plan with
dengan manfaat yang diatur dalam the benefit as stipulated under Law No.
Undang-Undang No. 6 Tahun 2023 6 of 2023 after deduction of
setelah dikurangi akumulasi kontribusi accumulated employee contributions
dari karyawan dan hasil investasi and the related investment results. If the
yang berkaitan. Jika manfaat dana employer-funded portion of the pension
pensiun yang didanai pemberi kerja plan benefit is less than the benefit as
lebih kecil dari manfaat sesuai required by Law No. 6 of 2023, the
Undang-Undang No. 6 Tahun 2023, Group will provide for such shortage.
Grup akan menyediakan
kekurangannya.
Pesangon Pemutusan Kontrak Termination Benefits
Kerja
Pesangon pemutusan kontrak Termination benefits are payable
terutang ketika karyawan dihentikan whenever an employee’s employment is
kontrak kerjanya sebelum usia terminated before the normal retirement
pensiun normal. Grup mengakui date. The Group recognizes termination
pesangon pemutusan kontrak kerja benefits when it is demonstrably
ketika Grup menunjukkan committed to terminate the employment
komitmennya untuk memberhentikan of current employees according to a
kontrak kerja dengan karyawan detailed formal plan with a low
berdasarkan suatu rencana formal possibility of withdrawal.
terperinci yang kecil kemungkinan
untuk dibatalkan.
- 41 -
Page 53
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
2. IKHTISAR KEBIJAKAN AKUNTANSI 2. SUMMARY OF SIGNIFICANT
DAN PELAPORAN KEUANGAN ACCOUNTING AND FINANCIAL
PENTING (Lanjutan) REPORTING POLICIES (Continued)
r. Pajak Penghasilan r. Income Tax
Perusahaan dan Entitas Anak The Company and Subsidiaries adopted
menerapkan PSAK No. 212, “Pajak PSAK No. 212, “Income Taxes”.
Penghasilan”.
Pajak Kini Current Tax
Pajak kini ditentukan berdasarkan Current tax expense is determined
laba kena pajak dalam tahun yang based on the taxable income for the
bersangkutan yang dihitung year computed using prevailing tax
berdasarkan tarif pajak yang berlaku. rates.
Pajak Tangguhan Deferred Tax
Pajak tangguhan diakui sebagai Deferred tax is provided using the
liabilitas jika terdapat perbedaan liability method on temporary
temporer kena pajak yang timbul dari differences between the tax bases of
perbedaan antara dasar pengenaan assets and liabilities and their carrying
pajak aset dan liabilitas dengan amounts for financial reporting purposes
jumlah tercatatnya pada tanggal at the reporting date.
pelaporan.
Aset pajak tangguhan diakui untuk Deferred tax assets are recognized for
seluruh perbedaan temporer yang all deductible temporary differences and
dapat dikurangkan dan rugi fiskal the carry forward benefit of any unused
yang dapat dikompensasikan. Aset tax losses. Deferred tax assets are
pajak tangguhan diakui dan direviu recognized and reviewed at each
pada setiap tanggal pelaporan atau reporting date and reduced to the extent
diturunkan jumlah tercatatnya, that it is probable that taxable profit will
sepanjang kemungkinan besar laba be available against which the
kena pajak tersedia untuk deductible temporary differences and
pemanfaatan perbedaan temporer the carry forward benefit of unused tax
yang dapat dikurangkan dan rugi losses can be utilized.
fiskal yang dapat dikompensasikan.
Aset dan liabilitas pajak tangguhan Deferred tax assets and liabilities are
diukur dengan menggunakan tarif measured at the tax rates that are
pajak yang diharapkan berlaku ketika expected to apply in the year when the
aset dipulihkan atau liabilitas asset is realized or the liability is settled,
diselesaikan, berdasarkan tarif pajak based on tax rates (or tax laws) that
(atau peraturan pajak) yang telah have been enacted or substantively
berlaku atau secara substantif telah enacted at the reporting date.
berlaku pada tanggal pelaporan.
- 42 -
Page 54
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
2. IKHTISAR KEBIJAKAN AKUNTANSI 2. SUMMARY OF SIGNIFICANT
DAN PELAPORAN KEUANGAN ACCOUNTING AND FINANCIAL
PENTING (Lanjutan) REPORTING POLICIES (Continued)
r. Pajak Penghasilan (Lanjutan) r. Income Tax (Continued)
Pajak Tangguhan (Lanjutan) Deferred Tax (Continued)
Aset dan liabilitas pajak tangguhan Deferred tax assets and liabilities are
diukur dengan menggunakan tarif measured at the tax rates that are
pajak yang diharapkan berlaku ketika expected to apply in the year when the
aset dipulihkan atau liabilitas asset is realized or the liability is settled,
diselesaikan, berdasarkan tarif pajak based on tax rates (or tax laws) that
(atau peraturan pajak) yang telah have been enacted or substantively
berlaku atau secara substantif telah enacted at the reporting date.
berlaku pada tanggal pelaporan.
Aset pajak tangguhan dan liabilitas Deferred tax assets and deferred tax
pajak tangguhan saling hapus jika dan liabilities are offset if and only if, a
hanya jika, terdapat hak yang legally enforceable right exists to set off
dipaksakan secara hukum untuk current tax assets against current tax
melakukan saling hapus aset pajak liabilities and the deferred taxes relate
kini terhadap liabilitas pajak kini dan to the same taxable entity and the same
pajak tangguhan tersebut terkait taxation authority.
dengan entitas kena pajak yang sama
dan dikenakan oleh otoritas
perpajakan yang sama.
s. Biaya Emisi Saham s. Stock Issuance Costs
Biaya emisi saham disajikan sebagai Stock issuance costs are deducted from
bagian dari akun tambahan modal additional paid-in capital and are not
disetor dan tidak diamortisasi. amortized.
t. Laba (Rugi) per Saham t. Earnings (Loss) per Share
Laba (rugi) per saham dasar dihitung Earnings (loss) per share are computed
dengan membagi laba (rugi) bersih by dividing net income (loss) attributable
yang dapat diatribusikan kepada to owners of the Parent Company by the
pemilik entitas induk dengan jumlah Weighted average number of shares
rata-rata tertimbang saham yang outstanding during the year.
beredar pada tahun yang
bersangkutan.
u. Informasi Segmen u. Segment Information
Segmen operasi diidentifikasi Operating segments are identified on
berdasarkan laporan internal the basis of internal reports about
komponen-komponen Grup yang components of the Group that are
secara berkala dilaporkan kepada regularly reviewed by the chief
pengambil keputusan operasional operating decision maker in order to
dalam rangka alokasi sumber daya ke allocate resources to the segments and
dalam segmen dan penilaian kinerja to assess their performances
Grup.
- 43 -
Page 55
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
3. PENGGUNAAN PERTIMBANGAN, 3. MANAGEMENT'S USE OF JUDGMENTS,
ESTIMASI DAN ASUMSI OLEH ESTIMATES AND ASSUMPTIONS
MANAJEMEN
Dalam penerapan kebijakan akuntansi In the application of the Company’s
Perusahaan, seperti yang diungkapkan accounting policies, which are disclosed in
dalam Catatan 2 pada laporan keuangan, Note 2 to the financial statements,
manajemen harus membuat estimasi, management is required to make estimates,
pertimbangan, dan asumsi atas nilai judgments, and assumptions about the
tercatat aset dan liabilitas yang tidak carrying amounts of assets and liabilities
tersedia oleh sumber-sumber lain. that are not readily apparent from other
Estimasi dan asumsi tersebut, sources. The estimates and assumptions
berdasarkan pengalaman historis dan are based on historical experience and
faktor lain yang dipertimbangkan relevan. other factors that are considered to be
relevant.
Manajemen berkeyakinan bahwa Management believes that the following
pengungkapan berikut telah mencakup represent a summary of the significant
ikhtisar estimasi, pertimbangan dan estimates, judgments, and assumptions
asumsi signifikan yang dibuat oleh made that affected certain reported amounts
manajemen, yang berpengaruh terhadap and disclosures in the consolidated financial
jumlah-jumlah yang dilaporkan serta statements.
pengungkapan dalam laporan keuangan
konsolidasian.
Pertimbangan Judgments
Pertimbangan-pertimbangan berikut The following judgments are made by
dibuat oleh manajemen dalam proses management in the process of applying the
penerapan kebijakan akuntansi Grup yang Group’s accounting policies that have the
memiliki dampak yang paling signifikan most significant effects on the amounts
terhadap jumlah-jumlah yang diakui dalam recognized in the consolidated financial
laporan keuangan konsolidasian: statements:
a. Mata Uang Fungsional a. Functional Currency
Mata uang fungsional Perusahaan The functional currency of the Company
dan entitas anak adalah mata uang and its subsidiaries is the currency of
lingkungan ekonomi utama dimana the primary economic environment in
masing-masing entitas beroperasi. which each of them operates. It is the
Mata uang tersebut adalah yang currency, among others, that mainly
paling mempengaruhi harga jual influences sales prices for goods and
barang dan jasa, dan mata uang dari services, and of the country whose
negara yang kekuatan persaingan dan competitive forces and regulations
peraturannya sebagian besar mainly determine the sales prices of its
menentukan harga jual barang dan goods and services, and the currency in
jasa entitas, dan merupakan mata which funds from financing activities are
uang yang mana dana dari aktivitas generated.
pendanaan dihasilkan.
- 44 -
Page 56
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
3. PENGGUNAAN PERTIMBANGAN, 3. MANAGEMENT'S USE OF JUDGMENTS,
ESTIMASI DAN ASUMSI OLEH ESTIMATES AND ASSUMPTIONS
MANAJEMEN (Lanjutan) (Continued)
Pertimbangan (Lanjutan) Judgments (Continued)
b. Klasifikasi Aset Keuangan dan b. Classification of Financial Assets and
Liabilitas Keuangan Liabilities
Grup menentukan klasifikasi aset dan The Group determines the
liabilitas tertentu sebagai aset classifications of certain assets and
keuangan dan liabilitas keuangan liabilities as financial assets and
dengan menilai apakah aset dan financial liabilities by judging if they
liabilitas tersebut memenuhi definisi meet the definition set forth in PSAK
yang ditetapkan dalam PSAK No. 109. No. 109. Accordingly, the financial
Aset keuangan dan liabilitas assets and financial liabilities are
keuangan dicatat sesuai dengan accounted for in accordance with the
informasi kebijakan akuntansi material Group’s material accounting policy
Grup sebagaimana diungkapkan information as disclosed in Note 2.
dalam Catatan 2.
c. Cadangan Kerugian Penurunan Nilai c. Allowance for Impairment
Grup mengakui ECL sepanjang umur The Group recognizes lifetime ECL
ketika telah ada peningkatan risiko when there has been a significant
kredit yang signifikan sejak increase in credit risk since initial
pengakuan awal. Jika sebaliknya, recognition. If, on the other hand, the
risiko kredit pada instrumenkeuangan credit risk on the financial instrument
tidak meningkat secara signifikan has not increased significantly since
sejak pengakuan awal, Grup initial recognition, the Group measures
mengukur penyisihan kerugian untuk the loss allowance for that financial
instrument keuangan tersebut instrument at an amount equal to 12-
sejumlah ECL 12 bulan. Penilaian month ECL. The assessment of whether
apakah ECL sepanjang umur harus lifetime ECL should be recognized is
diakui didasarkan pada peningkatan based on significant increases in the
signifikan dalam kemungkinan likelihood or risk of a default occurring
terjadinya atau pada risiko gagal since initial recognition instead of on
bayar sejak pengakuan awal dan evidence of a financial asset being
bukan didasarkan bukti aset credit impaired at the reporting date or
keuangan yang mengalami kerugian an actual default occurring. Lifetime
kredit pada tanggal pelaporan atau ECL represents the expected credit
kejadian gagal bayar sebenarnya. losses that will result from all possible
ECL sepanjang umur merupakan default events over the expected life of
kerugian kredit ekspetasian yang a financial instrument. In contrast, 12-
timbul dari seluruh kemungkinan month ECL represents the portion of
peristiwa gagal bayar selama lifetime ECL that is expected to result
perkiraan umur instrumen keuangan. from default events on a financial
Sebaliknya, ECL 12 bulan mewakili instrument that are possible within 12
porsi ECL sepanjang umur yang months after the reporting date.
timbul dari peristiwa gagal bayar pada
instrument keuangan yang mungkin
terjadi dalam 12 bulan setelah tanggal
pelaporan.
- 45 -
Page 57
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
3. PENGGUNAAN PERTIMBANGAN, 3. MANAGEMENT'S USE OF JUDGMENTS,
ESTIMASI DAN ASUMSI OLEH ESTIMATES AND ASSUMPTIONS
MANAJEMEN (Lanjutan) (Continued)
c. Cadangan Kerugian Penurunan Nilai c. Allowance for Impairment (Continued)
(Lanjutan)
Suatu evaluasi yang bertujuan untuk Evaluation of financial assets to
mengidentifikasi jumlah cadangan determine the allowance for expected
kerugian ekspektasian yang harus loss to be provided is performed
dibentuk, dilakukan secara berkala periodically in each reporting period.
pada setiap periode pelaporan. Oleh Therefore, the timing and amount of
karena itu, saat dan besaran jumlah allowance for expected credit loss
cadangan kerugian kredit recorded at each period might differ
ekspektasian yang tercatat pada based on the judgments and estimates
setiap periode dapat berbeda that are available or valid at each
tergantung pada pertimbangan atas period.
informasi yangtersedia atau berlaku
pada saat itu.
Nilai tercatat aset keuangan Grup The carrying value of the Group’s
dalam kategori yang diukur pada financial instruments categorized as
biaya perolehan diamortisasi tanggal financial assets at amortized cost as of
31 Desember 2025 dan 2024 adalah December 31, 2025 and 2024 follows:
sebagai berikut:
2025 2024
Kas dan setara kas 121.026.693 254.853.208 Cash and cash equivalents
Piutang usaha - - Trade accounts receivables
Piutang lain-lain - jangka pendek 3.000.000 740.000.000 Other accounts receivables - short-term
Aset lancar lainnya - 11.606.000.000 Other current assets
Deposito yang dibatasi penggunaannya 7.998.000.000 16.289.052.960 Restricted time deposits
Piutang lain-lain - jangka panjang 2.774.830.500 2.325.255.500 Other accounts receivables - long-term
Jumlah 10.896.857.193 31.215.161.668 Total
d. Pajak Penghasilan d. Income Taxes
Pertimbangan yang signifikan Significant judgment is required in
dibutuhkan untuk menentukan jumlah determining the provision for income
pajak penghasilan. Terdapat sejumlah taxes. There are many transactions and
transaksi dan perhitungan yang calculations for which the ultimate tax
menimbulkan ketidakpastian determination is uncertain due to
penentuan jumlah pajak penghasilan different interpretations of tax
karena interpretasi atas peraturan regulations. Where the final tax outcome
pajak yang berbeda. Jika hasil of these matters is different from the
pemeriksaan pajak berbeda dengan amounts that were initially recorded,
jumlah yang sebelumnya telah such differences will have an impact on
dibukukan, maka selisih tersebut akan the current and deferred income tax
berdampak terhadap aset dan assets and liabilities in the period in
liabilitas pajak kini dan tangguhan which such determination is made.
dalam periode dimana hasil
pemeriksaan tersebut terjadi.
- 46 -
Page 58
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
3. PENGGUNAAN PERTIMBANGAN, 3. MANAGEMENT'S USE OF JUDGMENTS,
ESTIMASI DAN ASUMSI OLEH ESTIMATES AND ASSUMPTIONS
MANAJEMEN (Lanjutan) (Continued)
Estimasi dan Asumsi Estimates and Assumptions
Asumsi utama mengenai masa depan dan The key assumptions concerning the future
sumber utama lain dalam mengestimasi and other key sources of estimation
ketidakpastian pada tanggal pelaporan uncertainty at the reporting date that have a
yang mempunyai risiko signifikan yang significant risk of causing a material
dapat menyebabkan penyesuaian material adjustment to the carrying amounts of
terhadap nilai tercatat aset dan liabilitas assets and liabilities within the next financial
dalam periode berikutnya diungkapkan di period are disclosed below. The Group
bawah ini. Grup mendasarkan asumsi dan based its assumptions and estimates on
estimasi pada parameter yang tersedia parameters available when the consolidated
saat laporan keuangan konsolidasian financial statements were prepared. Existing
disusun. Kondisi yang ada dan asumsi circumstances and assumptions about
mengenai perkembangan masa depan future developments may change due to
dapat berubah karena perubahan situasi market changes on circumstances arising
pasar yang berada di luar kendali Grup. beyond the control of the Group. Such
Perubahan tersebut tercermin dalam changes are reflected in the assumptions
asumsi ketika keadaan tersebut terjadi: when they occur:
a. Penurunan Nilai Aset Non-Keuangan a. Impairment of Non-Financial Assets
Penelaahan atas penurunan nilai Impairment review is performed when
dilakukan apabila terdapat indikasi certain impairment indicators are
penurunan nilai aset tertentu. present. Determining the fair value of
Penentuan nilai wajar aset assets requires the estimation of cash
membutuhkan estimasi arus kas flows expected to be generated from
yang diharapkan akan dihasilkan dari the continued use and ultimate
pemakaian berkelanjutan dan disposition of such assets. Any
pelepasan akhir atas aset tersebut. significant changes in the assumptions
Perubahan signifikan dalam asumsi- used in determining the fair value may
asumsi yang digunakan untuk materially affect the assessment of
menentukan nilai wajar dapat recoverable values and any resulting
berdampak signifikan pada nilai impairment loss could have a material
terpulihkan dan jumlah kerugian impact on results of operations.
penurunan nilai yang terjadi mungkin
berdampak material pada hasil
operasi Grup.
Nilai tercatat aset non-keuangan The carrying value of these assets as
tersebut pada tanggal 31 Desember of December 31, 2025 and 2024 are
2025 dan 2024 diungkapkan pada set out in Notes 10 and 11.
Catatan 10 dan 11.
- 47 -
Page 59
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
3. PENGGUNAAN PERTIMBANGAN, 3. MANAGEMENT'S USE OF JUDGMENTS,
ESTIMASI DAN ASUMSI OLEH ESTIMATES AND ASSUMPTIONS
MANAJEMEN (Lanjutan) (Continued)
Estimasi dan Asumsi (Lanjutan) Estimates and Assumptions (Continued)
b. Estimasi Masa Manfaat Aset Tetap b. Estimated Useful Lives of Fixed Assets
Masa manfaat dari masing-masing The useful life of each of the item of the
aset tetap Grup diestimasi Group’s property and equipment are
berdasarkan jangka waktu aset estimated based on the period over
tersebut diharapkan tersedia untuk which the asset is expected to be
digunakan. Estimasi tersebut available for use. Such estimation is
didasarkan pada penilaian kolektif based on a collective assessment of
berdasarkan bidang usaha yang similar business, internal technical
sama, evaluasi teknis internal dan evaluation and experience with similar
pengalaman dengan aset sejenis. assets. The estimated useful life of
Estimasi masa manfaat setiap aset each asset is reviewed periodically and
ditelaah secara berkala dan updated if expectations differ from
diperbarui jika estimasi berbeda dari previous estimates due to physical
perkiraan sebelumnya yang wear and tear, technical or commercial
disebabkan karena pemakaian, obsolescence, and legal or other limits
usang secara teknis atau komersial on the use of the asset.
serta keterbatasan hak atau
pembatasan lainnya terhadap
penggunaan aset.
Dengan demikian, hasil operasi di It is possible, however, that future
masa mendatang mungkin dapat results of operations could be
terpengaruh secara signifikan oleh materially affected by changes in the
perubahan dalam jumlah dan waktu amounts and timing of recorded
terjadinya biaya karena perubahan expenses brought about by changes in
yang disebabkan oleh faktor-faktor the factors mentioned above. A
yang disebutkan di atas. Penurunan reduction in the estimated useful life of
estimasi masa manfaat ekonomis any item of fixed assets would increase
setiap aset tetap akan menyebabkan the recorded depreciation and
kenaikan beban penyusutan dan decrease the carrying values of these
penurunan nilai tercatat aset tetap. assets.
Nilai tercatat aset tetap The carrying values of fixed assets of
Perusahaan pada tanggal the Company as of December 31, 2025
31 Desember 2025 dan 2024 and 2024 amounted to
masing-masing sebesar Rp 178,579,743,864 and
Rp 178.579.743.864 dan Rp 356,206,186,858, respectively
Rp 356.206.186.858 (Catatan 10). (Note 10).
- 48 -
Page 60
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
3. PENGGUNAAN PERTIMBANGAN, 3. MANAGEMENT'S USE OF JUDGMENTS,
ESTIMASI DAN ASUMSI OLEH ESTIMATES AND ASSUMPTIONS
MANAJEMEN (Lanjutan) (Continued)
Estimasi dan Asumsi (Lanjutan) Estimates and Assumptions (Continued)
c. Penurunan Nilai Goodwil dan Aset c. Impairment of Goodwill and other
Tak Berwujud Intangibles Assets
Aset tak berwujud, selain goodwill, Intangible assets, other than goodwill,
diuji penurunan nilai apabila indikasi are reviewed for impairment whenever
penurunan nilai telah terjadi. Untuk impairment indicators are present.
goodwill, uji penurunan wajib While for goodwill, impairment testing
dilakukan sedikitnya setahun sekali is required to be performed at least
tanpa memperhatikan apakah telah annually irrespective of whether or not
terjadi indikasi penurunan nilai. there are indications of impairment.
Penentuan nilai pakai aset Determining the value in use of assets
takberwujud membutuhkan estimasi requires the estimation of cash flows
arus kas yang diharapkan akan expected to be generated from the
dihasilkan dari pemakaian continued use and ultimate disposition
berkelanjutan dan pelepasan akhir of such assets (CGU) and a suitable
atas aset tersebut (UPK) serta tingkat discount rate in order to calculate the
diskonto yang tepat untuk present value.
menghitung nilai kini.
Manajemen berkeyakinan bahwa While it is believed that the
asumsi-asumsi yang digunakan assumptions used in the estimation of
dalam estimasi nilai pakai dalam the value in use of assets reflected in
laporan keuangan konsolidasian the consolidated financial statements
adalah tepat dan wajar, namun are appropriate and reasonable,
demikian, perubahan signifikan significant changes in this assumptions
dalam asumsi-asumsi tersebut dapat may materially affect the assessment
berdampak signifikan pada jumlah of recoverable values and any resulting
nilai terpulihkan dan jumlah impairment could have a material
penurunan nilai yang terjadi mungkin adverse impact on the the results of the
berdampak material pada hasil Group operations.
operasi Grup.
Nilai tercatat aset takberwujud dan The carrying values of intangible
goodwill, dimana telah diuji assets and goodwill, on which
penurunan nilai, masing-masing impairment analysis are applied, are
disajikan dalam Catatan 11 dan 12 described in Notes 11 and 12,
atas laporan keuangan respectively, to the consolidated
konsolidasian. financial statements.
- 49 -
Page 61
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
3. PENGGUNAAN PERTIMBANGAN, 3. MANAGEMENT'S USE OF JUDGMENTS,
ESTIMASI DAN ASUMSI OLEH ESTIMATES AND ASSUMPTIONS
MANAJEMEN (Lanjutan) (Continued)
Estimasi dan Asumsi (Lanjutan) Estimates and Assumptions (Continued)
d. Imbalan Kerja Jangka Panjang d. Long-term Employee Benefits
Penentuan liabilitas imbalan kerja The determination of long-term
jangka panjang dipengaruhi oleh employee benefits is dependent on the
asumsi tertentu yang digunakan oleh selection of certain assumptions used
aktuaris dalam menghitung jumlah by actuary in calculating such amounts.
kewajiban dan imbalan tersebut. Those assumptions are described in
Asumsi-asumsi yang digunakan Note 22 and include, among others,
diungkapkan dalam Catatan 22 dan rate of salary increase and discount
mencakup, antara lain, tingkat rate which is determined after giving
kenaikan gaji dan tingkat diskonto consideration to interest rates of
yang ditentukan dengan mengacu Government Bonds that are
pada imbal hasil pasar atas bunga denominated in the currency in which
Obligasi Pemerintah dalam mata the benefits are to be paid and have
uang yang sama dengan mata uang terms of maturity approximating the
pembayaran imbalan dan memiliki terms of the related employee benefits
jangka waktu yang mendekati liability. Actual results that differ from
estimasi jangka waktu liabilitas the Group’s assumptions are charged
imbalan kerja jangka panjang to comprehensive income and
tersebut. Hasil aktual yang berbeda therefore, generally affect the
dengan asumsi Grup dibukukan pada recognized comprehensive income and
penghasilan komprehensif lain dan recorded obligation in such future
dengan demikian, berdampak pada periods. While it is believed that the
jumlah penghasilan komprehensif lain Group’s assumptions are reasonable
yang diakui dan liabilitas yang dicatat and appropriate, significant differences
pada periode mendatang. Walaupun in actual experience or significant
Grup berpendapat bahwa asumsi changes in assumptions may materially
yang digunakan wajar dan dapat affect the amount of the Group’s long-
diandalkan, perbedaan signifikan term employee benefits liability.
pada hasil aktual atau perubahan
signifikan dalam asumsi dapat secara
material mempengaruhi jumlah
liabilitas imbalan kerja jangka
panjang Grup.
Pada tanggal 31 Desember 2025 dan As of December 31, 2025 and 2024,
2024, liabilitas imbalan kerja jangka longterm employee benefits liability
panjang masing-masing adalah amounted to Rp 4,632,407,376 and
sebesar Rp 4.632.407.376 dan Rp 3,940,871,317, respectively
Rp 3.940.871.317 (Catatan 22). (Note 22).
- 50 -
Page 62
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
3. PENGGUNAAN PERTIMBANGAN, 3. MANAGEMENT'S USE OF JUDGMENTS,
ESTIMASI DAN ASUMSI OLEH ESTIMATES AND ASSUMPTIONS
MANAJEMEN (Lanjutan) (Continued)
Estimasi dan Asumsi (Lanjutan) Estimates and Assumptions (Continued)
e. Aset Pajak Tangguhan e. Deferred Tax Assets
Aset pajak tangguhan diakui untuk Deferred tax assets are recognized for
semua perbedaan temporer antara all temporary differences between the
nilai tercatat aset dan liabilitas pada financial statements’ carrying amounts
laporan keuangan dengan dasar of existing assets and liabilities and
pengenaan pajak jika kemungkinan their respective taxes bases to the
besar jumlah laba kena pajak akan extent that it is probable that taxable
memadai untuk pemanfaatan profit will be available against which the
perbedaan temporer yang diakui. temporary differences can be utilized.
Estimasi manajemen yang signifikan Significant management estimates are
diperlukan untuk menentukan jumlah required to determine the amount of
aset pajak tangguhan yang diakui deferred tax assets that can be
berdasarkan kemungkinan waktu recognized, based upon the likely
terealisasinya dan jumlah laba kena timing and the level of future taxable
pajak pada masa mendatang serta profits together with future tax planning
strategi perencanaan pajak masa strategies.
depan.diperlukan untuk menentukan
jumlah aset pajak tangguhan yang
diakui berdasarkan kemungkinan
waktu terealisasinya dan jumlah laba
kena pajak pada masa mendatang
serta strategi perencanaan pajak
masa depan.
Pada tanggal 31 Desember 2025 dan As of December 31, 2025 and 2024,
2024, saldo aset pajak tangguhan deferred tax assets amounted to
masing-masing sebesar Rp 1,078,943,223 and
Rp 1.078.943.223 dan Rp 3,371,446,824, respectively
Rp 3.371.446.824 (Catatan 23). (Note 23).
4. KAS DAN SETARA KAS 4. CASH AND CASH EQUIVALENTS
Kas dan setara kas terdiri dari: Cash and cash equivalents consist of:
2025 2024
Bank Bank
PT Bank Mandiri (Persero) Tbk 38.758.863 171.600.378 PT Bank Mandiri (Persero) Tbk
PT Bank Nationalnobu Tbk 6.620.769 7.015.769 PT Bank Nationalnobu Tbk
PT Bank Mega Tbk 1.974.572 2.564.572 PT Bank Mega Tbk
Subjumlah 47.354.204 181.180.719 Subtotal
Deposito Time deposits
PT Bank Mandiri (Persero) Tbk 8.071.672.489 16.362.725.449 PT Bank Mandiri (Persero) Tbk
Subjumlah 8.071.672.489 16.362.725.449 Subtotal
- 51 -
Page 63
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
4. KAS DAN SETARA KAS (Lanjutan) 4. CASH AND CASH EQUIVALENTS
(Continued)
2025 2024
Deposito yang dibatasi Restricted time
penggunaannya (7.998.000.000) (16.289.052.960) deposits
Jumlah - Bersih 121.026.693 254.853.208 Total - Net
Berdasarkan mata uang: Based on currencies:
2025 2024
Rupiah 8.113.306.716 16.539.628.248 Rupiah
Dolar Amerika Serikat (Catatan 27) 5.719.977 4.277.920 United States Dollar (Note 27)
Jumlah 8.119.026.693 16.543.906.168 Total
5. PIUTANG USAHA DARI PIHAK KETIGA 5. TRADE ACCOUNTS RECEIVABLES
FROM THIRD PARTIES
Piutang usaha dari pihak ketiga terdiri Trade accounts receivables from third
dari: parties consist of:
2025 2024
PT Sinergi Bangun Utama - 4.955.474.409 PT Sinergi Bangun Utama
PT Dwi Mutiara Sejahtera - 428.110.699 PT Dwi Mutiara Sejahtera
Lain-lain (masing-masing kurang Others (less than
dari Rp 400.000.000) - 133.223.400 Rp 400,000,000 each)
Jumlah - 5.516.808.508 Total
Cadangan kerugian penurunan nilai - (5.516.808.508) Allowance for impairment
Jumlah - Bersih - - Total - Net
Analisa umur piutang usaha dari pihak The aging analysis of trade accounts
ketiga adalah sebagai berikut: receivable from third parties is as follows:
2025 2024
Belum jatuh tempo - - Not past due
Jatuh tempo: Overdue:
1 - 30 hari - - 1 - 30 days
31 - 60 hari - - 31 - 60 days
61 - 90 hari - - 61 - 90 days
91 - 120 hari - - 91 - 120 days
> 120 hari - 5.516.808.508 > 120 days
Jumlah - 5.516.808.508 Total
Cadangan kerugian penurunan nilai - (5.516.808.508) Allowance for impairment
Jumlah - Bersih - - Total - Net
- 52 -
Page 64
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
5. PIUTANG USAHA DARI PIHAK KETIGA 5. TRADE ACCOUNTS RECEIVABLES
(Lanjutan) FROM THIRD PARTIES (Continued)
Seluruh piutang usaha dari pihak ketiga All trade accounts receivable from third
didenominasi dalam mata uang Rupiah. parties are dominated in Rupiah.
Perubahan dalam cadangan kerugian The changes in allowance for impairment
penurunan nilai adalah sebagai berikut: are as follows:
2025 2024
Saldo awal tahun 5.516.808.508 - Balance at the beginning of the year
Penghapusan (5.516.808.508) - Write off
Penyisihan (Catatan 20) - 5.516.808.508 Allowance (Note 20)
Saldo akhir tahun - 5.516.808.508 Balance at the end of the year
Pada tanggal 31 Desember 2025, As of December 31, 2025, management
manajemen memutuskan untuk decided to write off the allowance for trade
menghapus nilai penyisihan atas piutang accounts receivables. As of December 31,
usaha. Pada tanggal 31 Desember dan 2024, based on a review of the status of
2024, berdasarkan penelaahan atas individual receivable accounts at the end of
status piutang dari masing-masing the year, management believed that the
pelanggan pada akhir tahun, manajemen allowance for impairment was sufficient to
berkeyakinan bahwa nilai penyisihan cover possible losses from uncollectible
penurunan nilai telah memadai untuk receivables.
menutup kemungkinan kerugian atas tidak
tertagihnya piutang usaha.
6. PIUTANG LAIN-LAIN 6. OTHER ACCOUNTS RECEIVABLES
Piutang lain-lain terdiri dari: Other accounts receivables consist of:
2025 2024
Pihak berelasi (Catatan 24) 2.774.830.500 2.325.255.500 Related parties (Note 24)
Pihak ketiga Third party
PT Solarion Energi Alam 271.880.000 500.000.000 PT Solarion Energi Alam
Lain-lain (masing-masing kurang Others (less than
dari Rp 500.000.000) 3.000.000 240.000.000 Rp 500,000,000 each)
Subjumlah 274.880.000 740.000.000 Subtotal
Cadangan kerugian penurunan nilai (271.880.000) - Allowance for impairment
Subjumlah - bersih 3.000.000 740.000.000 Subtotal - bersih
Jumlah 2.777.830.500 3.065.255.500 Total
Dikurangi jangka pendek (3.000.000) (740.000.000) Less short-term
Jumlah - jangka panjang 2.774.830.500 2.325.255.500 Total - long-term
Seluruh piutang lain-lain didenominasi All other accounts receivable are dominated
dalam mata uang Rupiah. in Rupiah.
- 53 -
Page 65
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
6. PIUTANG LAIN-LAIN (Lanjutan) 6. OTHER ACCOUNTS RECEIVABLES
(Continued)
Perubahan dalam cadangan kerugian The changes in allowance for impairment
penurunan nilai adalah sebagai berikut: are as follows:
2025 2024
Saldo awal tahun - - Balance at the beginning of the year
Penyisihan (Catatan 20) 271.880.000 - Allowance (Note 20)
Saldo akhir tahun 271.880.000 - Balance at the end of the year
Pada tanggal 31 Desember 2025 dan As of December 31, 2025 and 2024, based
2024, berdasarkan penelaahan atas on a review of the status of individual
status piutang dari masing-masing receivable accounts at the end of the year,
pelanggan pada akhir tahun, manajemen management believed that the allowance for
berkeyakinan bahwa nilai penyisihan impairment was sufficient to cover possible
penurunan nilai telah memadai untuk losses from uncollectible receivables.
menutup kemungkinan kerugian atas tidak
tertagihnya piutang lain-lain.
7. PAJAK DIBAYAR DIMUKA 7. PREPAID TAXES
Pajak dibayar dimuka terdiri dari: Prepaid taxes consist of:
2025 2024
Pajak Penghasilan Income Tax
Pasal 21 7.790.981 9.497.342 Article 21
Pajak Pertambahan Nilai - 1.315.195.422 Value Added Tax
Jumlah 7.790.981 1.324.692.764 Total
8. UANG MUKA 8. ADVANCE
Uang muka terdiri dari: Advances consist of:
2025 2024
Pembelian tanah - 5.117.600.000 Purchase of land
Lain-lain 36.880.000 - Others
Jumlah 36.880.000 5.117.600.000 Total
Dikurangi jangka pendek (36.880.000) - Less short-term
Jumlah - jangka panjang - 5.117.600.000 Total - long-term
- 54 -
Page 66
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
9. ASET LANCAR LAINNYA 9. OTHER CURRENT ASSETS
Akun ini merupakan aset lancar lainnya This accounts represents current other
atas bank garansi ke PT Bank UOB assets of bank guarantee to PT Bank UOB
Indonesia masing-masing sebesar Nihil Indonesia amounted to Nil and
dan Rp 11.606.000.000 pada tanggal Rp 11,606,000,000 as of December 31,
31 Desember 2025 dan 2024. 2025 and 2024, respectively.
Seluruh aset lancar lainnya didenominasi All current other assets are dominated in
dalam mata uang Rupiah. Rupiah.
10. ASET TETAP 10. FIXED ASSETS
Aset tetap terdiri dari: Fixed assets consist of:
Perubahan selama tahun 2025
Changes during year 2025
1 Januari 2025/ Penambahan/ Pengurangan/ Penurunan Nilai/ 31 Desember 2025/
January 1, 2025 Additions Deductions Impairment December 31, 2025
Biaya perolehan: At cost:
Kepemilikan langsung Direct acquisitions
Tanah 875.000.000 - - - 875.000.000 Land
Kendaraan 1.453.188.774 - 523.893.536 - 929.295.238 Vehicles
Inventaris 1.656.906.346 - 145.123.000 - 1.511.783.346 Equipment
Aset tetap dalam pembangunan 355.072.202.400 3.867.599.999 - (181.235.058.535) 177.704.743.864 Assets in progress
Jumlah 359.057.297.520 3.867.599.999 669.016.536 (181.235.058.535) 181.020.822.448 Total
Akumulasi penyusutan: Accumulated depreciation:
Kepemilikan langsung Direct acquisitions
Kendaraan 1.194.204.316 39.146.875 304.055.953 - 929.295.238 Vehicles
Inventaris 1.656.906.346 - 145.123.000 - 1.511.783.346 Equipment
Jumlah 2.851.110.662 39.146.875 449.178.953 - 2.441.078.584 Total
Nilai Tercatat 356.206.186.858 178.579.743.864 Net Carrying Value
Perubahan selama tahun 2024
Changes during year 2024
1 Januari 2024/ Penambahan/ Pengurangan/ Koreksi/ 31 Desember 2024/
January 1, 2024 Additions Deductions Correction December 31, 2024
Biaya perolehan: At cost:
Kepemilikan langsung Direct acquisitions
Tanah 875.000.000 - - - 875.000.000 Land
Bangunan 12.166.325.357 - 12.166.325.357 - - Building
Kendaraan 1.514.488.774 240.000.000 301.300.000 - 1.453.188.774 Vehicles
Inventaris 1.656.906.346 - - - 1.656.906.346 Equipment
Aset tetap dalam pembangunan 332.063.948.800 23.008.253.600 - - 355.072.202.400 Assets in progress
Jumlah 348.276.669.277 23.248.253.600 12.467.625.357 - 359.057.297.520 Total
Akumulasi penyusutan: Accumulated depreciation:
Kepemilikan langsung Direct acquisitions
Bangunan 5.119.995.253 456.237.201 5.576.232.454 - - Building
Kendaraan 1.441.641.815 53.862.501 301.300.000 - 1.194.204.316 Vehicles
Inventaris 1.585.406.904 71.499.442 - - 1.656.906.346 Equipment
Jumlah 8.147.043.972 581.599.144 5.877.532.454 - 2.851.110.662 Total
Nilai Tercatat 340.129.625.305 356.206.186.858 Net Carrying Value
Beban penyusutan dialokasikan sebagai Depreciation expense is included in general
bagian dari beban umum dan administrasi and administrative expenses (Note 20).
(Catatan 20).
Perusahaan memiliki beberapa bidang The Company‟s has several parcels of land
tanah yang terletak di Sumatera Utara located in Sumatera Utara with renewable
dengan hak legal berupa Hak Guna Building Use Rights (Hak Guna Bangunan
Bangunan yang dapat diperbarui dan or HGB) for 20 (twenty) years that will be
berjangka waktu 20 (dua puluh) tahun due in 2048.
yang akan jatuh tempo hingga tahun
2048.
- 55 -
Page 67
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
10. ASET TETAP (Lanjutan) 10. FIXED ASSETS (Continued)
Berdasarkan data tersebut, manajemen Management believes that it is probable to
berkeyakinan bahwa HGB akan dapat extend the term of the land rights on its
diperpanjang pada akhir periode HGB, expiration since all the land were acquired
karena masing-masing tanah diperoleh legally and supported by sufficient evidence
secara legal dan didukung oleh bukti of ownership..
kepemilikan yang memadai.
Pada tanggal 31 Desember 2025 dan As of December 31, 2025 and 2024, fixed
2024, aset tetap Grup tidak dijaminkan. assets Group not collacteral.
Pada tanggal 31 Desember 2025 dan As of December 31, 2025 and 2024, the
2024, aset tetap tidak diasuransikan Company’s fixed assets were not insured
terhadap risiko gempa bumi, kebakaran, against the risk of earthquake, loss due to
sabotase dan risiko lainnya. fire, sabotage and other possible risks.
Pada tanggal 31 Desember 2025 dan As of December 31, 2025 and 2024, the
2024, manajemen Grup berpendapat Group's management believes that the
penurunan nilai telah memadai menutup impairment loss is sufficient to cover the
nilai aset saat ini. current value of the asset.
Pengurangan selama tahun 2025 dan Deductions during year 2025 and 2024
2024 merupakan penjualan aset tetap pertain to the sale of certain fixed assets
dengan perincian sebagai berikut: with details as follows:
2025 2024
Harga jual 194.000.000 7.025.588.831 Selling price
Nilai tercatat (215.000.000) (6.590.092.903) Net carrying value
Keuntungan (kerugian) Gain (loss) on sale
penjualan aset tetap (21.000.000) 435.495.928 of fixed assets
Aset Tetap Dalam Pembangunan Assets Under Constructions
Aset tetap dalam pembangunan terdiri Assets under construction consist of:
dari:
2025 2024
Tanah 177.704.743.864 209.427.892.974 Land
Infrastruktur - 17.092.487.911 Infastructure
Biaya sehubungan dengan aset tetap Cost related to assets under
dalam pembangunan: construction:
Biaya profesional - 54.013.049.541 Professional fees
Biaya persiapan proyek - 29.327.725.821 Project preparation charges
Biaya tenaga kerja - 21.972.884.456 Labour charges
Biaya perijinan - 12.621.209.555 License fees
Biaya studi kelayakan - 6.788.334.457 Feasibility study fees
Biaya bunga - 3.828.617.685 Interest
Jumlah 177.704.743.864 355.072.202.400 Total
- 56 -
Page 68
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
10. ASET TETAP (Lanjutan) 10. FIXED ASSETS (Continued)
Biaya perolehan tanah merupakan akuisisi Land represents land acquisitions of
lahan entitas anak, dengan rincian subsidiaries, with details as follows:
sebagai berikut:
Nama Perusahaan/Name of Company 2025 2024 Lokasi Tanah /Located Land
PT Berkah Alam Lestari Energi (BALE) 62.469.194.115 61.601.594.115 Desa Simason Toruan dan Desa Simasom, Pahae Julu, Tapanuli Utara, Sumatera Utara
PT Energi Alam Sentosa (EAS) 62.184.311.530 59.184.311.530 Desa Pusuk, Kecamatan Parlilitan, Kabupaten Humbang Hasundutan, Provinsi Sumatera Utara
PT Indah Alam Lestari Energi (IALE) 53.051.238.219 53.051.238.219 Desa Lontung Dolok dan Desa Simasom Toruan, Pahae Julu, Tapanuli Utara, Sumatera Utara
PT Sumber Alam Energi Hidro (SAEH) - 30.709.781.335 Desa Naga Timbul dan Desa Huta Dolok, Sitahuis, Tapanuli Tengah, Sumatera Utara
PT Cahaya Abadi Lestari Energi (CALE) - 2.213.273.855 Desa Simasom, Pahae Julung, Tapanuli Utara, Sumatera Utara
PT Karya Abadi Lestari Energi (KABLE) - 1.983.167.561 Desa Lae Itam, Siempat Nempu Hilir, Dairi, Sumatera Utara
PT Karya Alam Lestari Energi (KALE) - 684.526.359 Desa Simantaniari, Pahae Julu, Tapanuli Utara, Sumatera Utara
Jumlah/Total 177.704.743.864 209.427.892.974
Biaya sehubungan dengan aset dalam Costs related to assets under construction
pembangunan di atas adalah dalam as mentioned above are in connection with
rangka pembangunan proyek Pembangkit the construction project of Mini Hydro Power
Listrik Tenaga Mini Hidro (PLTMH) dan (MHP) and Solar Power (SP) of
Pembangkit Listrik Tenaga Surya (PLTS) subsidiaries.
oleh entitas anak.
Aset tetap dalam pembangunan sesuai Assets under construction by project name
dengan nama proyek sebagai berikut: are as follows:
Target Kapasitas Terpasang/ Target Tahun Konstruksi/ Target Tahun Operasi Komersial/
Nama Proyek/Project Name Perusahaan/Company Target Installed Capacity Target Year of Construction Targer Year of Commercial Operation
PLTMH Batang Toru 3 BALE 10 MW (2 x 5.0 MW) 2022 2024
PLTMH Sisira EAS 9.8 MW (2 x 4.9 MW) 2022 2024
PLTMH Naga Timbul SAEH 7 MW (2 x 3.5 MW) 2023 2025
PLTMH Huta Dolok SAEH 7 MW (2 x 3.5 MW) 2023 2025
PLTMH Simbelin KABLE 7 MW (2 x 3.5 MW) 2023 2025
PLTMH Batang Toru 4 IALE 10 MW (2 x 5.0 MW) 2022 2024
PLTMH Batang Toru Simasom CALE 5.6 MW (2 x 2.8 MW) 2023 2025
PLTMH Batang Toru Simantaniari MHE 5.4 MW (2 x 2.7 MW) 2023 2025
PLTMH Musi Kota Agung MHP 10 MW (2 x 5.0 MW) 2023 2025
PLTMH Teunom II KALE 332 MW 2023 2025
PLTMH Teunom III TEU 135 MW 2023 2025
Pada tanggal 31 Desember 2025 dan As of December 31, 2025 and 2024, these
2024, aset tetap dalam pembangunan ini assets under construction are still on the
masih dalam tahap persiapan construction preparation stage.
pembangunan.
Penurunan nilai atas aset dalam The impairment of assets under construction
pembangunan dilakukan berdasarkan was recognized based on Management's
pertimbangan Manajemen bahwa nilai assessment that a revaluation was
aset dalam pembangunan perlu dilakukan necessary due to delays in the construction
penilaian kembali akibat tertunda nya of the Group's hydropower plant projects.
pembangunan proyek-proyek hydropower This impairment charge was recorded in
plant yang dimiliki Grup. Penurunan nilai accordance with the principles of prudence
atas aset dalam pembangunan dilakukan and conservatism.
berdasarkan asas kehati-hatian dan
konservatif.
- 57 -
Page 69
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
11. GOODWILL 11. GOODWILL
Akun ini merupakan selisih antara biaya This account represents the difference
akuisisi PT Terregra Hydro Power (THP) between the acquisition cost of PT Terregra
dengan nilai aset bersih teridentifikasi Hydro Power (THP) and net identifiable
pada Catatan 1c. assets acquired as disclosed in Note 1c.
Goodwill terdiri dari: Goodwill consist of:
2025 2024
PT Terregra Hydro Power 14.146.187.211 14.146.187.211 PT Terregra Hydro Power
PT Energi Alam Sentosa 15.853.772.494 15.853.772.494 PT Energi Alam Sentosa
PT Berkah Alam Lestari Energi 13.424.371.645 13.424.371.645 PT Berkah Alam Lestari Energi
PT Sumber Alam Energi Hidro 12.571.556.005 12.571.556.005 PT Sumber Alam Energi Hidro
PT Indah Alam Lestari Energi 5.354.061.077 5.354.061.077 PT Indah Alam Lestari Energi
PT Karya Abadi Lestari Energi 1.957.666.608 1.957.666.608 PT Karya Abadi Lestari Energi
PT Cahaya Abadi Lestari Energi 1.825.096.345 1.825.096.345 PT Cahaya Abadi Lestari Energi
PT Karya Alam Lestari Energi 1.326.824.333 1.326.824.333 PT Karya Alam Lestari Energi
Jumlah 66.459.535.718 66.459.535.718 Total
Penurunan nilai (50.605.763.224) (5.109.587.286) Impairment
Jumlah - Bersih 15.853.772.494 61.349.948.432 Total - Net
Uji Penurunan Nilai Goodwill Impairment Test for Goodwill
Goodwill yang diperoleh melalui kombinasi Goodwill acquired through business
bisnis dialokasikan ke dua (2) Unit combination has been allocated to 2 (two)
Penghasil Kas (UPK) Grup, yang juga individual Cash Generating Units (CGU),
merupakan segmen dilaporkan, untuk uji which are also reportable segments for
penurunan nilai yaitu: Perdagangan dan impairment testing, namely: Trading and
Pembangkit listrik. Powerplant.
Goodwill dialokasikan ke UPK Grup yang Goodwill is allocated to the Group’s CGU
diharapkan akan mendapat manfaat dari expected to benefit from the acquisition.
akuisisi.
Nilai terpulihkan UPK ditentukan The recoverable amount of a CGU is
berdasarkan perhitungan nilai pakai. determined based on value-inuse
Perhitungan tersebut menggunakan calculations. These calculations use pre-tax
proyeksi arus kas sebelum pajak yang cash flow projections based on an
didasarkan pada perjanjian dengan agreement with PT Perusahaan Listrik
PT Perusahaan Listrik Negara (Persero) Negara (Persero) and a feasibility study that
dan feasibility study yang telah disahkan was approved by management.
manajemen.
- 58 -
Page 70
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
11. GOODWILL (Lanjutan) 11. GOODWILL (Continued)
Asumsi-asumsi utama dalam perhitungan The key assumptions used for value-in-use
nilai pakai tahun 2025 adalah sebagai calculations in 2025 are as follows:
berikut:
Pembangkit tenaga listrik/Electric power plant
Listrik yang dihasilkan * 30.747.600 kWh - 56.940.000 kWh Energy output *
Beban air Rp 10/kWh Water usage
Beban operasional dan pemeliharaan 3,50% - 5,00% Operating and maintenance cost
Suku bunga pinjaman 7,50% - 9,00% Loan interest rate
Tingkat diskonto ** 6,88% - 7,10% Discount rate **
*) Listrik yang dihasilkan berdasarkan kapasitas masing-masing pembangkit/Energy output is based on the capacity of each energy output
**) Tingkat diskonto sebelum pajak yang diterapkan pada proyeksi arus kas/ Pre-tax discount rate applied to the cash flow projections
Asumsi-asumsi tersebut telah digunakan These assumptions have been used for the
dalam analisa masing-masing UPK. analysis of each CGU.
Manajemen menentukan besaran marjin Management determined the gross margin
kotor berdasarkan perjanjian dengan based on an agreement with
PT Perusahaan Listrik Negara (Persero) PT Perusahaan Listrik Negara (Persero)
dan feasibility study. Tingkat diskonto and a feasibility study. The discount rates
yang digunakan adalah sebelum pajak. used are pretax.
12. ASET LAIN-LAIN 12. OTHER ASSETS
Aset lain-lain terdiri dari: Other assets consist of:
2025 2024
Aset tidak berwujud Intangible Assets
Harga perolehan 194.125.000 194.125.000 Cost
Amortisasi (194.125.000) (194.125.000) Amortization
Jumlah - - Total
13. UTANG BANK JANGKA PENDEK 13. SHORT-TERM BANK LOAN
Utang bank jangka pendek terdiri dari: Short-term bank loan consist of:
2025 2024
Fasilitas Time Loan Revolving 6.750.000.000 6.787.500.000 Time Loan Revolving Facility
Fasilitas Kredit Lokal 1.926.536.983 1.986.876.143 Local Credit Facility
Fasilitas Installment Loan 41.666.667 41.666.667 Installment Loan Facility
Jumlah 8.718.203.650 8.816.042.810 Total
- 59 -
Page 71
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
13. UTANG BANK JANGKA PENDEK 13. SHORT-TERM BANK LOAN (Continued)
(Lanjutan)
Berdasarkan Surat Pemberitahuan Based on the Credit Provision Notification
Pemberian Kredit (SPPK) Letter (SPPK) No. 1250/SLA/2021 dated
No. 1250/SLA/2021 tanggal 28 Juni 2021, June 28, 2021, the Company received
Perusahaan menerima beberapa fasilitas several facilities from PT Bank Central Asia
dari PT Bank Central Asia Tbk (Bank Tbk (Bank BCA), including:
BCA), antara lain:
Fasilitas/ Plafon/ Suku Bunga/ Jangka Waktu/
Facilities Plafond Interest Rate Time Period
Kredit Lokal/Local Credit 2.000.000.000 11,50% 1 Tahun/Year
Time Loan Revolving 6.750.000.000 11,25% 1 Tahun/Year
Bank Garansi/Bank Guarantee 1.000.000.000 11,25% 1 Tahun/Year
Installment Loan 250.000.000 11,25% 5 Tahun/Year
Perusahaan dan Bank BCA telah The Company and Bank BCA have
memperpanjang Fasilitas Kredit Lokal dan extended the Local Credit Facility and Time
Time Loan Revolving sampai dengan Loan Revolving until October 4, 2025. As of
tanggal 4 Oktober 2025. Sampai dengan the date of the independent auditor's report,
laporan auditor independen Perusahaan the Company has not renewed the loan
belum memperpanjang fasilitas pinjaman facility with Bank BCA.
tersebut dengan bank BCA.
Jaminan atas fasilitas pinjaman di atas Collateral of the above loans are as follows:
adalah sebagai berikut:
1. Tanah dengan Hak Milik No. 4120 1. Land with Right of Ownership No. 4120
seluas 642 m² terletak di Propinsi Bali with a total area of 642 m² in Bali on
atas nama Roy Petrus Chalim, behalf of Roy Petrus Chalim, stockholder
pemegang saham Perusahaan. of the Company.
2. Tanah dengan Hak Milik No. 4477 2. Land with Right of Ownership No. 4447
dengan total luas 1.742 m² terletak di with a total area of 1,742 m² in Bali on
Propinsi Bali, atas nama Iwan Sugiarjo, behalf of Iwan Sugiarjo, stockholder of
pemegang saham Perusahaan. the Company.
Pembatasan-pembatasan Restrictions
Perjanjian pinjaman juga mencakup The loan agreement included covenants not
persyaratan tertentu untuk tidak to perform certain actions without prior
melakukan hal-hal berikut tanpa written consent from the bank among
persetujuan tertulis terlebih dahulu dari others:
pihak bank, antara lain:
Memperoleh pinjaman uang/kredit Obtaining new credit/loan from other
baru dari pihak lain dan atau parties and or commit as guarantor in
mengikatkan diri sebagai penjamin any name.
dalam bentuk apapun.
Meminjamkan uang, termasuk tetapi Provide loan to others, including but not
tidak terbatas kepada Perusahaan limited to related partiesexcept for
afiliasinya, kecuali dalam rangka working capital.
menjalankan usaha sehari-hari.
- 60 -
Page 72
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
13. UTANG BANK JANGKA PENDEK 13. SHORT-TERM BANK LOAN (Continued)
(Lanjutan)
Pembatasan-pembatasan (Lanjutan) Restrictions (Continued)
Melakukan penggabungan, Perform merger, acquisition, dissolution/
pengambilalihan, pembubaran/ liquidation and change the institutional
likuidasi dan mengubah status status.
kelembagaan.
Beban bunga atas pinjaman ini masing- Interest expense on this loan amounted to
masing sebesar Rp 777.242.115 dan Rp 777,242,115 and Rp 894,623,365 in
Rp 894.623.365 tahun 2025 dan 2024. 2025 and 2024, respectively.
Sehubungan dengan fasilitas di atas, In connection with the above facilities, the
Perusahaan tidak memenuhi sebagian Company did not meet certain restrictions
batasan-batasan (negative covenants) (negative covenants) contained in the
yang tercantum dalam perjanjian dan tidak agreement and has not received the
memperoleh pembebasan tuntutan necessary waiver as of the date of the
(waiver) yang diperlukan sampai dengan financial statements.
tanggal laporan keuangan.
14. UTANG LAIN-LAIN KEPADA PIHAK 14. OTHER ACCOUNTS PAYABLE TO THIRD
KETIGA PARTIES
Utang lain-lain kepada pihak ketiga dari: Other accounts payables to third parties
consist of:
2025 2024
PTE Carbon Ressilience LTD 12.494.501.076 23.638.899.916 PTE Carbon Ressilience LTD
Lain-lain 1.580.000.000 1.987.253.240 Others
Jumlah 14.074.501.076 25.626.153.156 Total
Berdasarkan mata uang: Based on currencies:
2025 2024
Rupiah 1.580.000.000 13.593.253.240 Rupiah
Dolar Amerika Serikat (Catatan 27) 12.494.501.076 12.032.899.916 United States Dollar (Note 27)
Jumlah 14.074.501.076 25.626.153.156 Total
- 61 -
Page 73
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
14. UTANG LAIN-LAIN KEPADA PIHAK 14. OTHER ACCOUNTS PAYABLE TO THIRD
KETIGA (Lanjutan) PARTIES (Continued)
Pada tanggal 21 Januari 2022, EAS dan On January 21, 2022, EAS and BALE (a
BALE (Entitas Anak) menandatangani Subsidiaries) entered into a Convertible
Perjanjian Pinjaman Konversi dengan Loan Aggrement with PTE Carbon
PTE Carbon Ressilience LTD ("CRS"). Ressilience. LTD ('CRS'). Based on the
Berdasarkan Perjanjian tersebut, CRS aggrement, CRS will provide loans to
akan memberikan pinjaman kepada subsidiaries (EAS, BALE, and IALE) with a
entitas anak (EAS, BALE dan IALE) maximum loan amount of
dengan jumlah pinjaman maksimal Rp.199,301,000,000. To finance
Rp.199.301.000.000. Untuk pembiayaan Hydropower Plant Projects of the Sisira
proyek Hydropower Plant PLTMH Sisira PLTMH (9,8MW), Batang Toru-3 (10MW)
(9,8MW), PLTMH Batang Toru-3 (10MW) and Batang Toru-4 (10MW). This loan bears
dan PLTMH Batang Toru-4 (10MW). an interest rate of 1% per year and will be
Pinjaman ini dikenakan tingkat bunga 1% paid at the end of the loan term.
per tahun dan akan dibayarkan pada akhir
masa pinjaman.
Pada tanggal 28 April 2023, Grup On April 28, 2023, the Group received the
menerima Restrukturisasi Pinjaman Development Loan Restructuring through 2
Pembangunan melalui 2 opsi: options:
1. Semua saldo terutang dan bunga 1. All outstanding balances and accrued
serta biaya yang masih harus interest and fees of the Development
dibayar dari Pinjaman Pembangunan Loans will be transferred to SAEH and
akan dialihkan ke SAEH dan MHP/THP in proportions to be agreed.
MHP/THP dalam proporsi yang akan The so restructured development loan
disetujui. Pinjaman pembangunan to SAEH and MHP/THP shall be
yang direstrukturisasi kepada SAEH convertible, at CRS’s sole option, into
dan MHP/THP akan dapat equity of SAEH and MHP/THP at an
dikonversi, atas pilihan CR, menjadi agreed conversion price or for an
ekuitas SAEH dan MHP/THP agreed percentage of the share capital
dengan harga konversi yang of SAEH and MHP/THP, to be agreed
disetujui atau untuk persentase yang between the parties as part of the
disetujui dari modal saham SAEH contracts implementing this
dan MHP/THP, yang akan disetujui restructuring.
antara para pihak sebagai bagian
dari kontrak yang melaksanakan
restrukturisasi ini.
2. EAS, BALE dan/atau Terregra Hydro 2. EAS, BALE and/or Terregra Hydro
melunasi seluruh pokok, bunga yang repay in full the principal, accrued
masih harus dibayar, dan biaya interest and fees of the Development
Pinjaman Pengembangan dan Loans and the outstanding bond
fasilitas obligasi yang belum facilities advanced by CR to PLN for
dicairkan oleh CR kepada PLN untuk the Batang Toru 4 hydropower project.
proyek PLTA Batang Toru 4. This repayment will trigger the release
Pelunasan ini akan memicu of the pledge in favour of CR of
pelepasan jaminan atas nama CR Terregra Hydro’s shares in EAS and
atas saham Terregra Hydro di EAS BALE as well as the pledge in favour
dan BALE serta jaminan atas nama of CR of all of Mr. Djani Sutedja’s and
CR atas seluruh saham milik Bapak in PT Terregra Asia Energy Tbk.
Djani Sutedja dan di PT Terregra
Asia Energy Tbk.
- 62 -
Page 74
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
15. UTANG PAJAK 15. TAX PAYABLES
Utang pajak terdiri dari: Tax payables consist of:
2025 2024
Pajak Penghasilan Income Tax
Pasal 4(2) 88.921.273 100.743.495 Article 4(2)
Pasal 21 2.684.939.147 1.696.116.696 Article 21
Pasal 23 2.977.636.173 93.384.260 Article 23
Pasal 29 1.460.485.808 1.175.951.920 Article 29
Pajak Pertambahan Nilai 3.484.067.283 2.694.489.713 Value Added Tax
Jumlah 10.696.049.684 5.760.686.084 Total
Besarnya pajak yang terutang ditetapkan The filed tax returns are based on the
berdasarkan perhitungan pajak yang Group’s own calculation of tax liabilities
dilakukan sendiri oleh wajib pajak (self- (self- assessment). The time limit for the tax
assessment). Kantor Pajak dapat authorities to assess or amend taxes is
melakukan pemeriksaan atas perhitungan determined in accordance with provisions of
pajak dalam jangka waktu tertentu setelah the prevailing Law.
terutangnya pajak, sebagaimana diatur
dalam Undang-undang yang berlaku.
16. BEBAN AKRUAL 16. ACCRUED EXPENSES
Beban akrual terdiri dari: Accrued expenses consists of:
2025 2024
Gaji dan tunjangan 7.990.159.521 4.506.123.193 Salaries and allowances
Studi kelayakan 7.701.508.838 7.701.288.067 Feasibility study
Profesional 1.661.967.500 1.039.323.225 Professional
BPJS 718.605.367 502.981.029 Social security
Lain-lain - 1.685.478.175 Others
Jumlah 18.072.241.226 15.435.193.689 Total
17. MODAL SAHAM 17. CAPITAL STOCK
Susunan kepemilikan saham Perusahaan The share ownership in the Company is as
adalah sebagai berikut: follows:
31 Desember 2025 dan 2024/December 31, 2025 and 2024
Jumlah modal
Jumlah Persentase ditempatkan dan
saham/ kepemilikan (%)/ disetor/
Number of Percentage of Total issued and
Nama pemegang saham shares ownership (%) paid-up capital Name of stockholders
PT Terregra Asia Equity 452.676.000 16,46% 45.267.600.000 PT Terregra Asia Equity
Djani Sutedja 87.588.200 3,19% 8.758.820.000 Djani Sutedja
Roy Petrus Chalim 40.070.000 1,46% 4.007.000.000 Roy Petrus Chalim
Iwan Sugiarjo 34.193.400 1,24% 3.419.340.000 Iwan Sugiarjo
Lasman Citra 2.290.000 0,08% 229.000.000 Lasman Citra
Masyarakat (masing-masing Public (each below
dibawah 5% kepemilikan) 2.133.182.400 77,57% 213.318.240.000 5% ownership)
Jumlah 2.750.000.000 100,00% 275.000.000.000 Total
- 63 -
Page 75
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
17. MODAL SAHAM (Lanjutan) 17. CAPITAL STOCK (Continued)
Perubahan dalam jumlah saham beredar The change in the number of shares
adalah sebagai berikut: outstanding is as follows:
Jumlah/Amount
Saldo pada tanggal 1 Januari 2017 2.200.000.000 Balance as of January 1, 2017
Penerbitan saham selama tahun 2017 Issuance of shares in 2017
melalui penawaran umum 550.000.000 thorugh offering to the public
Saldo pada tanggal 31 Desember 2025 dan 2024 2.750.000.000 Balance as of December 31, 2025 and 2024
Manajemen Permodalan Capital Management
Tujuan utama dari pengelolaan modal The primary objective of the Group’s capital
Grup adalah untuk memastikan bahwa management is to ensure that it maintains
Grup mempertahankan rasio modal healthy capital ratios in order to support its
yang sehat dalam rangka mendukung business and maximize shareholder value.
bisnis dan memaksimalkan nilai The Group is not required to meet any
pemegang saham. Grup tidak diwajibkan capital requirements.
untuk memenuhi syarat-syarat modal
tertentu.
Grup mengelola struktur modal dan The Group manages its capital structure
membuat penyesuaian terhadap struktur and makes adjustments to it, in light of
modal sehubungan dengan perubahan changes in economic conditions.
kondisi ekonomi.
Rasio utang bersih terhadap modal pada Ratio of net debt to equity as of December
tanggal 31 Desember 2025 dan 2024 31, 2025 and 2024 was as follows:
adalah sebagai berikut:
2025 2024
Jumlah utang 155.035.590.859 147.870.134.909 Total borrowings
Dikurangi : kas dan setara kas (121.026.693) (254.853.208) Less: cash and cash equivalents
Utang bersih (kelebihan atas kas dan Net debt (excess of cash and cash
setara kas atas pinjaman) 154.914.564.166 147.615.281.701 equivalents over borrowings)
Jumlah ekuitas 51.418.396.896 310.714.901.637 Total equity
Rasio pinjaman dan utang bersih Net debt to
terhadap ekuitas 33,19% 210,49% equity ratio
- 64 -
Page 76
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
17. MODAL SAHAM (Lanjutan) 17. CAPITAL STOCK (Continued)
Tambahan Modal Disetor Additional Paid-up Capital
Pada tahun 2017, Perusahaan melakukan In 2017, the Company had its initial public
Penawaran Umum Perdana Saham offering with details as follow:
Perusahaan dengan rincian sebagai
berikut:
2017
Jumlah saham yang dikeluarkan 550.000.000 Number of shares issued
Nilai jual perdana per saham 200 Initial selling price per share
Nilai nominal per saham 100 Par value per share
Agio per saham 100 Premium per share
Jumlah agio saham dari penerbitan saham 55.000.000.000 Total additional paid-in capital from issuance cost
Biaya emisi saham (8.425.118.878) Share issuance cost
Jumlah tambahan modal disetor 46.574.881.122 Total additional paid-in capital
18. SELISIH NILAI TRANSAKSI DENGAN 18. DIFFERENCE IN VALUE ARISING FROM
PIHAK NONPENGENDALI TRANSACTIONS WITH NON
CONTROLLING INTERESTS
Pada tahun 2019, PT Terregra Hydro In 2019, PT Terregra Hydro Power (THP), a
Power (THP), entitas anak, menjual subsidiary, sold its investment in shares of
kepemilikan sahamnya atas PT Berkah PT Berkah Alam Lestari Energi (BALE) by
Alam Lestari Energi (BALE) sebesar Rp 18,836,500,000, which resulted in
Rp 18.836.500.000, yang mengakibatkan decrease in the THP’s ownership interest in
penurunan persentase kepemilikan THP BALE from 80.25% to 56.18%. The impact
dari sebelumnya 80,25% menjadi of the dilution in ownership interest
56,18%. Dampak dilusi persentase amounting to Rp 4,666,058,600 was
kepemilikan tersebut sebesar recognized as “Difference in Value Arising
Rp4.666.058.600 disajikan pada akun from Transactions with non- controlling
“Transaksi dengan pihak nonpengendali” interests” in equity section.
di bagian ekuitas.
Pada tahun 2019, PT Terregra Hydro In 2019, PT Terregra Hydro Power (THP), a
Power (THP), entitas anak, menjual subsidiary, sold its investment in shares of
kepemilikan sahamnya atas PT Energi PT Energi Alam Sentosa (EAS) by Rp
Alam Sentosa (EAS) sebesar 21,966,000,000, which resulted in decrease
Rp 21.966.000.000, yang mengakibatkan in the THP’s ownership interest in EAS from
penurunan persentase kepemilikan THP 80.25% to 56.17%. The impact of the
dari sebelumnya 80,25% menjadi dilution in ownership interest amounting to
56,17%. Dampak dilusi persentase Rp5,959,711,420 was recognized as
kepemilikan tersebut sebesar “Difference in Value Arising from
Rp5.959.711.420 disajikan pada akun Transactions with non- controlling interests”
“Transaksi dengan pihak nonpengendali” in equity section.
di bagian ekuitas.
- 65 -
Page 77
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
18. SELISIH NILAI TRANSAKSI DENGAN 18. DIFFERENCE IN VALUE ARISING FROM
PIHAK NONPENGENDALI (Lanjutan) TRANSACTIONS WITH NON
CONTROLLING INTERESTS (Continued)
Rincian pada akun ini adalah sebagai The details of this account are as follows:
berikut:
2025 2024
Selisih perubahan ekuitas Difference due to change in equity
PT EAS 5.959.711.420 5.959.711.420 of PT EAS
Selisih perubahan ekuitas Difference due to change in equity
PT BALE 4.666.058.600 4.666.058.600 of PT BALE
Jumlah 10.625.770.020 10.625.770.020 Total
19. KEPENTINGAN NON-PENGENDALI 19. NON-CONTROLLING INTERESTS
Akun ini merupakan bagian kepemilikan This account represents the share of non-
nonpengendali atas aset (liabilitas) bersih controlling stockholders on the net assets
entitas anak, dengan rincian sebagai (liabilities) of the subsidiaries, with details as
berikut: follows:
Aset Bersih/Net Assets
31 Desember 2025/December 31, 2025
Saldo Laba (Defisit)/
Modal Saham/ Retained Earnings Jumlah/
Capital Stock (Deficit) Total
Kepemilikan langsung Direct ownership
PT Terregra Hydro Power 26.000.000 (81.756.964) (55.756.964) PT Terregra Hydro Power
Kepemilikan tidak langsung Indirect ownership
melalui PT Terregra Hydro Power through PT Terregra Hydro Power
PT Energi Alam Sentosa 18.020.000.000 (4.393.135.975) 13.626.864.025 PT Energi Alam Sentosa
PT Berkah Alam Lestari Energi 15.452.500.000 (7.143.264.019) 8.309.235.981 PT Berkah Alam Lestari Energi
PT Indah Alam Lestari Energi 5.889.500.000 (3.777.022.979) 2.112.477.021 PT Indah Alam Lestari Energi
PT Borneo Hydro Electric 300.000.000 (116.550.000) 183.450.000 PT Borneo Hydro Electric
PT Musi Hydro Electric 300.000.000 (178.155.883) 121.844.117 PT Musi Hydro Electric
PT MYI Hidro Power 237.000.000 (134.407.379) 102.592.621 PT MYI Hidro Power
PT MYI Energi Lestari 3.000.000 (342.847) 2.657.153 PT MYI Energi Lestari
PT Karya Alam Lestari Energi 647.000.000 (766.245.990) (119.245.990) PT Karya Alam Lestari Energi
PT Cahaya Abadi Lestari Energi 981.000.000 (1.113.547.139) (132.547.139) PT Cahaya Abadi Lestari Energi
PT Karya Abadi Lestari Energi 1.422.000.000 (1.664.211.696) (242.211.696) PT Karya Abadi Lestari Energi
PT Teunom Hidro Power 260.000.000 (3.177.527.813) (2.917.527.813) PT Teunom Hidro Power
PT Sumber Alam Energi Hidro 5.392.000.000 (9.402.483.079) (4.010.483.079) PT Sumber Alam Energi Hidro
PT Meutia Hidro Perkasa 260.000.000 (4.364.115.055) (4.104.115.055) PT Meutia Hidro Perkasa
Jumlah 49.190.000.000 (36.312.766.818) 12.877.233.182 Total
- 66 -
Page 78
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
19. KEPENTINGAN NON-PENGENDALI 19. NON-CONTROLLING INTERESTS
(Lanjutan) (Continued)
Aset Bersih/Net Assets
31 Desember 2024/December 31, 2024
Saldo Laba (Defisit)/
Modal Saham/ Retained Earnings Jumlah/
Capital Stock (Deficit) Total
Kepemilikan langsung Direct ownership
PT Terregra Hydro Power 26.000.000 (61.018.988) (35.018.988) PT Terregra Hydro Power
Kepemilikan tidak langsung Indirect ownership
melalui PT Terregra Hydro Power through PT Terregra Hydro Power
PT Berkah Alam Lestari Energi 15.452.500.000 3.597.052.738 19.049.552.738 PT Berkah Alam Lestari Energi
PT Energi Alam Sentosa 18.020.000.000 (1.963.325.985) 16.056.674.015 PT Energi Alam Sentosa
PT Indah Alam Lestari Energi 5.889.500.000 (1.590.822.444) 4.298.677.556 PT Indah Alam Lestari Energi
PT Sumber Alam Energi Hidro 5.392.000.000 (1.897.598.918) 3.494.401.082 PT Sumber Alam Energi Hidro
PT Karya Abadi Lestari Energi 1.422.000.000 (623.673.253) 798.326.747 PT Karya Abadi Lestari Energi
PT Cahaya Abadi Lestari Energi 981.000.000 (383.964.086) 597.035.914 PT Cahaya Abadi Lestari Energi
PT Karya Alam Lestari Energi 647.000.000 (292.375.294) 354.624.706 PT Karya Alam Lestari Energi
PT Borneo Hydro Electric 300.000.000 (116.550.000) 183.450.000 PT Borneo Hydro Electric
PT Musi Hydro Electric 300.000.000 (92.674.207) 207.325.793 PT Musi Hydro Electric
PT MYI Hidro Power 237.000.000 (1.449.098) 235.550.902 PT MYI Hidro Power
PT Teunom Hidro Power 260.000.000 (219.910.461) 40.089.539 PT Teunom Hidro Power
PT MYI Energi Lestari 3.000.000 (21.783) 2.978.217 PT MYI Energi Lestari
PT Meutia Hidro Perkasa 260.000.000 (393.920.621) (133.920.621) PT Meutia Hidro Perkasa
Jumlah 49.190.000.000 (4.040.252.400) 45.149.747.600 Total
Laba (rugi) komprehensif yang dapat
diatribusikan kepada kepentingan non
pengendali/Comprehensive profit (loss)
attributable to non-controlling interest
2025 2024
Kepemilikan langsung Direct ownership
PT Terregra Hydro Power (20.737.976) (822.590) PT Terregra Hydro Power
Kepemilikan tidak langsung Indirect ownership
melalui PT Terregra Hydro Power through PT Terregra Hydro Power
PT Berkah Alam Lestari Energi (10.740.316.757) (90.763.028) PT Berkah Alam Lestari Energi
PT Sumber Alam Energi Hidro (7.504.884.161) (70.581.503) PT Sumber Alam Energi Hidro
PT Energi Alam Sentosa (2.429.809.990) (98.205.461) PT Energi Alam Sentosa
PT Indah Alam Lestari Energi (2.186.200.535) (18.883.086) PT Indah Alam Lestari Energi
PT Teunom Hidro Power (2.957.617.352) (84.019.597) PT Teunom Hidro Power
PT Karya Abadi Lestari Energi (1.040.538.443) (59.312.814) PT Karya Abadi Lestari Energi
PT Meutia Hidro Perkasa (3.970.194.434) (13.735.323) PT Meutia Hidro Perkasa
PT Cahaya Abadi Lestari Energi (729.583.053) (5.313.187) PT Cahaya Abadi Lestari Energi
PT Karya Alam Lestari Energi (473.870.696) (4.142.014) PT Karya Alam Lestari Energi
PT MYI Hidro Power (132.958.281) (853.680) PT MYI Hidro Power
PT Musi Hydro Electric (85.481.676) (59.879.250) PT Musi Hydro Electric
PT MYI Energi Lestari (321.064) (12.978) PT MYI Energi Lestari
PT Borneo Hydro Electric - (89.879.250) PT Borneo Hydro Electric
Jumlah (32.272.514.418) (596.403.761) Total
- 67 -
Page 79
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
20. BEBAN UMUM DAN ADMINISTRASI 20. GENERAL AND ADMINISTRATIVE
EXPENSES
Rincian dari beban umum dan The detail of general and administrative
administrasi adalah sebagai berikut: expenses is as follows:
2025 2024
Gaji dan tunjangan 4.297.331.276 4.572.099.481 Salaries and allowances
Jasa profesional 1.233.900.000 782.607.020 Professional fees
Beban imbalan kerja (Catatan 22) 974.940.570 470.874.884 Employee benefits expense (Note 22)
Pencadangan piutang Allowance for other
lain-lain (Catatan 6) 271.880.000 - accounts receivables (Note 6)
Perjalanan dinas 60.899.030 576.585.654 Business trip
Iuran 60.000.000 117.000.000 Contribution
Penyusutan (Catatan 10) 39.146.875 581.599.144 Depreciation (Note 10)
Transportasi 18.862.252 423.234.434 Transportation
Sumbangan 3.000.000 130.505.000 Donation
Pemeliharaan dan perbaikan 1.350.000 355.070.791 Repair and maintenance
Pencadangan piutang Allowance for trade
usaha (Catatan 5) - 5.516.808.508 accounts receivables (Note 5)
Lain-lain 23.482.001 276.949.862 Others
Jumlah 6.984.792.004 13.803.334.778 Total
21. BEBAN BUNGA DAN KEUANGAN 21. INTEREST AND OTHER FINANCIAL
LAINNYA CHARGES
Rincian dari pendapatan bunga dan The detail of interest and other financial
keuangan lainnya adalah sebagai berikut: charges is as follows:
2025 2024
Beban bunga utang bank Short-term bank loan
jangka pendek 777.242.115 894.623.365 interest expenses
Bank garansi 24.323.882 994.218.153 Bank guarantee
Bank administrasi 8.113.427 7.505.245 Administrative bank
Jumlah 809.679.424 1.896.346.763 Total
22. IMBALAN KERJA JANGKA PANJANG 22. LONG-TERM EMPLOYEE BENEFITS
Besarnya liabilitas imbalan kerja jangka The amount of long-term employee benefits
panjang dihitung berdasarkan ketentuan liability is determined based on the
yang berlaku. Presiden Republik applicable provisions. The President of the
Indonesia telah menetapkan Peraturan Republic of Indonesia has issued
Pemerintah Pengganti Undang-Undang Government Regulation in Lieu of Law No. 2
No. 2 Tahun 2022 tentang Cipta Kerja of 2022 concerning Job Creation (Perppu
(Perppu Cipta Kerja 2/2022) pada tanggal Cipta Kerja 2/2022) on December 30, 2022
30 Desember 2022 yang merupakan as the implementation of the Constitutional
pelaksanaan dari Putusan MK Court’s Decision No. 91/PUU-XVIII/2020.
No. 91/PUU-XVIII/2020. Perppu Cipta Perppu Cipta Kerja 2/2022 has been
Kerja 2/2022 telah ditetapkan menjadi enacted into law on June 30, 2023, based
Undang-Undang pada tanggal 30 Juni on Law No.6 of 2023.
2023 berdasarkan Undang-Undang No. 6
Tahun 2023.
- 68 -
Page 80
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
22. IMBALAN KERJA JANGKA PANJANG 22. LONG-TERM EMPLOYEE BENEFITS
(Lanjutan) (Continued)
Tidak terdapat pendanaan khusus yang No funding of the benefits has been made to
disisihkan oleh Grup sehubungan dengan date.
imbalan pasca kerja tersebut.
Perhitungan aktuaria terakhir atas The latest actuarial valuation upon the
liabilitas imbalan kerja jangka panjang longterm employees benefits liability was
tersebut dilakukan oleh Syamsuddin B. performed by Syamsuddin B. Salam, an
Salam, aktuaris independen, tertanggal independent actuary, dated July 27, 2026.
27 Juli 2026.
Jumlah-jumlah yang diakui dalam Iaporan Amounts recognized in the statements of
laba rugi dan penghasilan komprehensif profit or loss and other consolidated
lain konsolidasian adalah sebagai berikut: cmprehensive income are as follows:
2025 2024
Beban jasa kini 655.697.590 495.656.734 Current service cost
Biaya Jasa Lalu - (61.396.253) Past Service Cost
Biaya bunga 319.242.980 36.614.403 Interest expense
Komponen biaya imbalan pasti yang Components of defined benefits cost
yang diakui di laba rugi 974.940.570 470.874.884 recognized in profit or loss
Komponen biaya imbalan pasti yang Components of defined costs recognized
diakui di penghasilan komprehensif lain in other comprehensive income
Kerugian (keuntungan) aktuarial (283.404.511) (46.600.696) Actuarial loss (income)
Jumlah 691.536.059 424.274.188 Total
Biaya jasa kini dan biaya bunga neto The current service cost and the net interest
untuk tahun berjalan disajikan sebagai expense for the year are included in the
bagian dari “Beban umum dan usaha” “General and administrative expenses”
pada laba rugi (Catatan 20). (Note 20).
Pengukuran kembali atas liabilitas The remeasurement of the net defined
imbalan pasti diakui dalam penghasilan benefits liability is included in other
komprehensif lain. comprehensive income.
Mutasi nilai kini kewajiban imbalan pasti Movement of present value of defined
adalah sebagai berikut: benefits liability is as follows:
2025 2024
Saldo awal 3.940.871.317 3.516.597.129 Beginning balance
Beban imbalan kerja Employee benefits expense
(Catatan 20) 974.940.570 470.874.884 (Note 20)
Rugi (penghasilan) komprehensif lain (283.404.511) (46.600.696) Other comprehensive loss (income)
Saldo akhir tahun 4.632.407.376 3.940.871.317 Balance at the end of the year
- 69 -
Page 81
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
22. IMBALAN KERJA JANGKA PANJANG 22. LONG-TERM EMPLOYEE BENEFITS
(Lanjutan) (Continued)
Asumsi-asumsi aktuarial utama yang The principal actuarial assumptions used in
digunakan dalam perhitungan imbalan valuation of the long-term employee benefits
kerja jangka panjang: are as follows:
2025 2024
Tingkat diskonto 4,59% - 6,5% 6,69% - 7,14% Discount rate
Tingkat kenaikan gaji 8% 8% Salary growth rate
Usia pensiun 55 tahun/year 55 tahun/year Retirement age
23. PAJAK PENGHASILAN 23. INCOME TAX
Manfaat (beban) pajak penghasilan Grup The income tax benefit (expense) of the
terdiri dari: Group consists of the following:
2025 2024
Pajak kini Current tax
Perusahaan - - The company
Entitas anak - - Subsidiaries
Subjumlah - - Subtotal
Pajak tangguhan Deferred tax
Perusahaan (1.024.912.628) 1.353.956.178 The company
Entitas anak (1.205.241.981) 836.771.878 Subsidiaries
Subjumlah (2.230.154.609) 2.190.728.056 Subtotal
Jumlah (2.230.154.609) 2.190.728.056 Total
Pajak Kini Current Tax
Rekonsiliasi antara rugi sebelum pajak A reconciliation between loss before tax per
menurut laporan laba rugi dan consolidated statements of profit or loss and
penghasilan komprehensif lain other comprehensive income and fiscal loss
konsolidasian dengan rugi fiskal adalah is as follows:
sebagai berikut:
2025 2024
Rugi sebelum pajak menurut laporan Loss before tax per consolidated
laba rugi dan penghasilan statements of profit or loss and
komprehensif lain konsolidasian (257.287.405.651) (25.889.533.776) other comprehensive income
Penurunan goodwill 14.146.187.211 - Impairment of goodwill
Rugi sebelum pajak entitas Loss before tax of
anak - bersih 206.245.198.547 9.077.926.591 the subsidiaries - net
Rugi sebelum pajak Perusahaan (36.896.019.893) (16.811.607.185) Loss before tax of the Company
- 70 -
Page 82
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
23. PAJAK PENGHASILAN (Lanjutan) 23. INCOME TAX (Continued)
2025 2024
Perbedaan temporer: Temporary differences:
Beban manfaat karyawan 586.234.747 304.323.893 Employee benefits expense
Pencadangan piutang Allowance of other
lain-lain 271.880.000 - accounts receivables
Pencadangan piutang Allowance of trade
usaha - 5.516.808.508 accounts receivables
Subjumlah 858.114.747 5.821.132.401 Subtotal
Perbedaan tetap: Permanent differences:
Pajak 10.102.118.705 33.591.009 Taxes
Pendapatan bunga (19.948) (1.040.313) Interest income
Lain-lain 21.675.590.333 1.191.208.049 Others
Subjumlah 31.777.689.089 1.223.758.745 Subtotal
Rugi fiskal Perusahaan (4.260.216.057) (9.766.716.039) Fiscal loss of the Company
Kompensasi rugi fiskal tahun: Application of prior year fiscal loss:
2023 (3.530.919.224) (3.530.919.224) 2023
2024 (9.766.716.039) - 2024
Akumulasi rugi fiskal (17.557.851.320) (13.297.635.263) Accumulated fiscal loss
Pemeriksaan Pajak Tax Audit
Pada tahun 2025, Perusahaan In 2025, the Company received several
mendapatkan beberapa Surat Ketetapan Notices of Tax Underpayment Assessment
Pajak Kurang Bayar dari kantor pajak from the tax office, with details as follows:
dengan rincian sebagai berikut:
No Surat Ketetapan
Pajak/No Tax
Jenis Pajak Assessment Notice Masa Pajak/Tax Period Nominal/Amount Type of Taxes
Pajak Pertambahan Nilai 00023/207/18/086/23 Juli/July 2018 19.455.356 Value Added Tax
Pajak Pertambahan Nilai 00025/207/18/086/23 September/September 2018 107.919.942 Value Added Tax
Pajak Pertambahan Nilai 00026/207/18/086/23 Oktober/October 2018 12.792.714 Value Added Tax
Pajak Pertambahan Nilai 00001/207/21/086/25 Agustus/August 2021 70.000.000 Value Added Tax
Pajak Pertambahan Nilai 00033/107/21/086/25 Oktober/October 2021 165.104.705 Value Added Tax
Pajak Pertambahan Nilai 00002/207/21/086/25 Oktober/October 2021 2.348.449.324 Value Added Tax
Pajak Pertambahan Nilai 00034/107/21/086/25 Desember/December 2021 7.675.500 Value Added Tax
Pajak Pertambahan Nilai 00003/207/21/086/25 Desember/December 2021 109.360.524 Value Added Tax
Pajak Pertambahan Nilai 00050/107/22/086/25 Desember/December 2022 137.558.695 Value Added Tax
Pajak Pertambahan Nilai 00013/207/22/086/25 Desember/December 2022 1.709.717.698 Value Added Tax
Pajak Penghasilan Pasal 21 00015/201/22/086/25 Februari/February 2022 40.591.880 Income Tax Article 21
Pajak Penghasilan Pasal 21 00016/201/22/086/25 Maret/March 2022 40.728.170 Income Tax Article 21
Pajak Penghasilan Pasal 21 00017/201/22/086/25 April/April 2022 40.796.316 Income Tax Article 21
Pajak Penghasilan Pasal 21 00018/201/22/086/25 Mei/May 2022 41.000.752 Income Tax Article 21
Pajak Penghasilan Pasal 21 00019/201/22/086/25 Juni/June 2022 41.000.752 Income Tax Article 21
Pajak Penghasilan Pasal 21 00020/201/22/086/25 Juli/July 2022 41.068.897 Income Tax Article 21
Pajak Penghasilan Pasal 21 00021/201/22/086/25 Agustus/August 2022 40.932.606 Income Tax Article 21
Saldo dipindahkan 4.974.153.831 Balance carried forward
- 71 -
Page 83
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
23. PAJAK PENGHASILAN (Lanjutan) 23. INCOME TAX (Continued)
Pemeriksaan Pajak (Lanjutan) Tax Audit (Continued)
No Surat Ketetapan
Pajak/No Tax
Jenis Pajak Assessment Notice Masa Pajak/Tax Period Nominal/Amount Type of Taxes
Saldo pindahan 4.974.153.831 Balance brought forward
Pajak Penghasilan Pasal 21 00022/201/22/086/25 September/September 2022 41.000.752 Income Tax Article 21
Pajak Penghasilan Pasal 21 00023/201/22/086/25 Oktober/October 2022 41.137.042 Income Tax Article 21
Pajak Penghasilan Pasal 21 00024/201/22/086/25 November/November 2022 41.000.752 Income Tax Article 21
Pajak Penghasilan Pasal 21 00025/201/22/086/25 Desember/December 2022 62.294.975 Income Tax Article 21
Pajak Penghasilan Pasal 21 00059/101/22/086/25 Desember/December 2022 1.100.000 Income Tax Article 21
Pajak Penghasilan Pasal 23 00023/203/18/086/23 Oktober/October 2018 19.928.220 Income Tax Article 23
Pajak Penghasilan Pasal 23 00024/203/18/086/23 November/November 2018 40.505.951 Income Tax Article 23
Pajak Penghasilan Pasal 23 00025/203/18/086/23 Desember/December 2018 116.702.073 Income Tax Article 23
Pajak Penghasilan Pasal 23 00014/203/21/086/25 Desember/December 2021 1.849.540.120 Income Tax Article 23
Pajak Penghasilan Pasal 23 00020/103/21/086/25 Desember/December 2021 100.000 Income Tax Article 23
Pajak Penghasilan Pasal 23 00014/103/22/086/25 Januari/January 2022 100.000 Income Tax Article 23
Pajak Penghasilan Pasal 23 00015/103/22/086/25 Februari/February 2022 100.000 Income Tax Article 23
Pajak Penghasilan Pasal 23 00016/103/22/086/25 Mei/May 2022 100.000 Income Tax Article 23
Pajak Penghasilan Pasal 23 00017/103/22/086/25 Juli/July 2022 100.000 Income Tax Article 23
Pajak Penghasilan Pasal 23 00018/103/22/086/25 Agustus/August 2022 100.000 Income Tax Article 23
Pajak Penghasilan Pasal 23 00019/103/22/086/25 September/September 2022 100.000 Income Tax Article 23
Pajak Penghasilan Pasal 23 00020/103/22/086/25 Desember/December 2022 100.000 Income Tax Article 23
Pajak Penghasilan Pasal 23 00025/203/22/086/25 Desember/December 2022 999.714.060 Income Tax Article 23
Pajak Penghasilan Pasal 29 00005/206/18/086/23 Tahun/Year 2018 2.269.944.892 Income Tax Article 29
Pajak Penghasilan Pasal 29 00001/206/21/086/25 Tahun/Year 2021 1.087.233.363 Income Tax Article 29
Pajak Penghasilan Pasal 29 00001/206/22/086/25 Tahun/Year 2022 364.783.453 Income Tax Article 29
Jumlah 11.909.839.484 Total
Pembayaran denda Payment of fines for
tahun berjalan 33.328.220 the current year
Pengurangan sanksi yang sudah disetujui (190.001.949) Approved reduction of sanctions
Pembayaran yang sudah terutang (1.651.047.050) Outstanding payments
Denda pajak Entitas Anak 54.325.041 Subsidiary tax penalties
Jumlah - Bersih 10.156.443.746 Total - Net
Pajak Tangguhan Deferred Tax
Rincian aset pajak tangguhan The detail of the Company’s deferred tax
Perusahaan adalah sebagai berikut: assets is as follows:
Dibebankan (Dikreditkan) ke/
Charged (Credited) to
Penghasilan
komprehensif lain/
1 Januari 2025/ Laba rugi/ Other comprehensive 31 Desember 2025/
January 1, 2025 Profit or loss income December 31, 2025
Perusahaan The Company
Pencadangan piutang Allowance for trade
usaha 1.213.697.872 (1.213.697.872) - - accounts receivables
Pencadangan piutang Allowance for other
lain-lain - 59.813.600 - 59.813.600 accounts receivables
Imbalan kerja 509.838.165 128.971.644 (42.414.207) 596.395.602 Employee benefits
Subjumlah 1.723.536.037 (1.024.912.628) (42.414.207) 656.209.202 Subtotal
- 72 -
Page 84
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
23. PAJAK PENGHASILAN (Lanjutan) 23. INCOME TAX (Continued)
Pajak Tangguhan (Lanjutan) Deferred Tax (Continued)
Dibebankan (Dikreditkan) ke/
Charged (Credited) to
Penghasilan
komprehensif lain/
1 Januari 2025/ Laba rugi/ Other comprehensive 31 Desember 2025/
January 1, 2025 Profit or loss income December 31, 2025
Entitas Anak Subsidiaries
Rugi fiskal 1.290.757.262 (1.290.757.262) - - Fiscal loss
Imbalan kerja 357.153.525 85.515.281 (19.934.785) 422.734.021 Employee benefits
Subjumlah 1.647.910.787 (1.205.241.981) (19.934.785) 422.734.021 Subtotal
Aset Pajak Tangguhan - Bersih 3.371.446.824 (2.230.154.609) (62.348.992) 1.078.943.223 Deferred Tax Assets - Net
Dibebankan (Dikreditkan) ke/
Charged (Credited) to
Penghasilan
komprehensif lain/
1 Januari 2024/ Laba rugi/ Other comprehensive 31 Desember 2024/
January 1, 2024 Profit or loss income December 31, 2024
Perusahaan The Company
Pencadangan piutang Allowance for trade
usaha - 1.213.697.872 - 1.213.697.872 accounts receivables
Imbalan kerja 375.530.020 140.258.306 (5.950.161) 509.838.165 Employee benefits
Subjumlah 375.530.020 1.353.956.178 (5.950.161) 1.723.536.037 Subtotal
Entitas Anak Subsidiaries
Rugi fiskal 535.759.748 754.997.514 - 1.290.757.262 Fiscal loss
Imbalan kerja 279.681.154 81.774.364 (4.301.993) 357.153.525 Employee benefits
Subjumlah 815.440.902 836.771.878 (4.301.993) 1.647.910.787 Subtotal
Aset Pajak Tangguhan - Bersih 1.190.970.922 2.190.728.056 (10.252.154) 3.371.446.824 Deferred Tax Assets - Net
24. SIFAT DAN TRANSAKSI HUBUNGAN 24. NATURE OF RELATIONSHIP AND
BERELASI TRANSACTIONS WITH RELATED
PARTIES
Sifat Pihak Berelasi Nature of Relationships
1. PT Terregra Asia Equity, Djani 1. PT Terregra Asia Equity, Djani Sutedja,
Sutedja, Roy Petrus Chalim, Iwan Roy Petrus Chalim, Iwan Sugiarjo and
Sugiarjo dan Lasman Citra merupakan Lasman Citra are stockholders of the
pemegang saham Perusahaan. Company.
2. iDaniel PMD. T. Dedo merupakan 2. Daniel PMD. T. Dedo is Director of the
Direktur Perusahaan. Company.
- 73 -
Page 85
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
24. SIFAT DAN TRANSAKSI HUBUNGAN 24. NATURE OF RELATIONSHIP AND
BERELASI (Lanjutan) TRANSACTIONS WITH RELATED
PARTIES (Continued)
Transaksi dengan Pihak Berelasi Transactions with Related Parties
Rincian transaksi dengan pihak-pihak The accounts involving transactions with
berelasi adalah sebagai berikut: related parties are as follows:
Persentase terhadap Jumlah Aset dan
Liabilitas/Percentage to Total Assets and
Liabilities
2025 2024 2025 2024
Aset Asset
Piutang lain-lain Other accounts receivable
PT Terregra Asia Equity 1.485.500.000 1.485.500.000 0,72% 0,32% PT Terregra Asia Equity
Iwan Sugiarjo 1.289.330.500 839.755.500 0,62% 0,18% Iwan Sugiarjo
Jumlah 2.774.830.500 2.325.255.500 1,34% 0,51% Total
Liabilitas Liabilities
Utang pihak berelasi non usaha Due to related parties
PT Terregra Asia Equity 68.625.181.910 69.388.706.910 44,26% 46,93% PT Terregra Asia Equity
Djani Sutedja 24.703.625.875 12.781.175.881 15,93% 8,64% Djani Sutedja
Daniel PMD. T. Dedo 3.936.806.012 3.994.306.012 2,54% 2,70% Daniel PMD. T. Dedo
Lasman Citra 690.187.040 690.187.040 0,45% 0,47% Lasman Citra
Iwan Sugiarjo 549.228.470 1.099.653.470 0,35% 0,74% Iwan Sugiarjo
Roy Petrus Chalim 337.158.540 337.158.540 0,22% 0,23% Roy Petrus Chalim
Jumlah 98.842.187.847 88.291.187.853 63,75% 59,71% Total
Kompensasi Dewan Direksi dan Compensation of the Board of Directors
Komisaris and Commissioners
2025 2024
Komisaris Commissioners
Jangka pendek 775.222.250 966.812.000 Short term
Jangka panjang 27.775.750 34.188.000 Long term
Subjumlah 802.998.000 1.001.000.000 Subtotal
Direksi Directors
Jangka pendek 1.312.102.000 1.312.102.000 Short term
Jangka panjang 46.398.000 46.398.000 Long term
Subjumlah 1.358.500.000 1.358.500.000 Subtotal
Jumlah 2.161.498.000 2.359.500.000 Total
- 74 -
Page 86
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
25. RUGI PER SAHAM 25. LOSS PER SHARE
Perhitungan rugi per saham dasar The computation of basic loss per share is
berdasarkan pada informasi berikut: based on the following data:
2025 2024
Rugi tahun berjalan (259.296.504.741) (23.662.457.178) Loss for the year
Rata-rata tertimbang saham Weighted average number of
biasa untuk perhitungan laba ordinary shares for computation
per saham dasar 2.750.000.000 2.750.000.000 of basic earnings per share
Jumlah rugi per saham dasar Total basic loss per
yang dapat diatribusikan share attributable
kepada pemegang saham (94) (9) to shareholders
26. TUJUAN DAN KEBIJAKAN 26. FINANCIAL RISK MANAGEMENT
MANAJEMEN RISIKO KEUANGAN OBJECTIVES AND POLICIES
Aktivitas Grup terpengaruh berbagai risiko The Group’s activities are exposed to a
keuangan: risiko pasar (termasuk risiko variety of financial risks: market risk
mata uang dan risiko suku bunga), risiko (including currency risk and interest rate
kredit dan risiko likuiditas. Program risk), credit risk and liquidity risk. The
manajemen risiko Grup secara Group’s overall risk management
keseluruhan difokuskan pada pasar programme focuses on the unpredictability
keuangan yang tidak dapat diprediksi dan of financial markets and seeks to minimize
Grup berusaha untuk meminimalkan potential adverse effects on the Group’s
dampak yang berpotensi merugikan financial performance.
kinerja keuangan Grup.
Manajemen risiko merupakan tanggung Risk management is the responsibility of the
jawab Direksi. Direksi bertugas Board of Directors (BOD). The BOD has the
menentukan prinsip dasar kebijakan responsibility to determine the basic
manajemen risiko Grup secara principles of the Group’s risk management
keseluruhan serta kebijakan pada area as well as principles covering specific areas,
tertentu seperti risiko mata uang asing, such as foreign exchange risk, interest rate
risiko suku bunga, risiko kredit dan risiko risk, credit risk and liquidity risk.
likuiditas.
Risiko Pasar Market Risk
Risiko Suku Bunga Interest Rate Risk
Risiko suku bunga Grup timbul dari utang The Group's interest rate risk arises from
bank dan utang pembelian aset tetap. bank loans and purchase fixed assets
Pinjaman yang diterima dengan suku payables. Loans received at floating interest
bunga mengambang mengakibatkan rates result in interest rate risk arising from
timbulnya risiko suku bunga arus kas cash flows to the Group. During 2025 and
terhadap Grup. Selama tahun 2025 dan 2024, the Group's floating interest rate loans
2024, pinjaman Grup pada suku bunga are denominated in Rupiah.
mengambang didenominasikan dalam
Rupiah.
- 75 -
Page 87
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
26. TUJUAN DAN KEBIJAKAN 26. FINANCIAL RISK MANAGEMENT
MANAJEMEN RISIKO KEUANGAN OBJECTIVES AND POLICIES (Continued)
(Lanjutan)
Risiko Pasar (Lanjutan) Market Risk (Continued)
Risiko Suku Bunga (Lanjutan) Interest Rate Risk (Continued)
Pada tanggal 31 Desember 2025 dan As of December 31, 2025 and 2024 the
2024 saldo utang bank jangka pendek balances of short-term bank loan is as
adalah sebagai berikut: follows:
2025 2024
Rata-rata Rata-rata
Tertimbang Suku Tertimbang Suku
Bunga/Weighted Bunga/Weighted
Average Interest Average Interest
Rate Nominal/Amount Rate Nominal/Amount
Utang bank jangka pendek 11,25% 8.718.203.650 11,25% 8.816.042.810 Short-term bank loan
Jumlah 8.718.203.650 8.816.042.810 Total
Risiko Mata Uang Asing Foreign Exchange Risk
Risiko mata uang asing adalah risiko Foreign exchange rate risk is the risk that
dimana nilai wajar atas arus kas the fair value or future contractual cash
kontraktual masa datang dari suatu flows of a financial instrument will fluctuate
instrumen keuangan akan terpengaruh because of changes in foreign exchange
akibat perubahan nilai tukar. rates.
Grup dalam melakukan kegiatan The Group’s major transactions loan is
usahanya sebagian besar mostly denominated in Rupiah currency.
mempergunakan mata uang Rupiah Transactions in foreign currency are only
dalam hal transaksi pinjaman. Transaksi done for special purpose, and the
usaha dalam mata uang asing hanya management regularly reviews its foreign
dilakukan untuk hal-hal khusus, dan jika currency exposure.
hal tersebut terjadi manajemen akan
melakukan reviu berkala atas eksposur
mata uang asing tersebut.
Pada tanggal 31 Desember 2025 dan As of December 31, 2025 and 2024, if
2024, jika Rupiah melemah/menguat Rupiah had weakened/strengthened by 10%
sebesar 10% terhadap Dolar Amerika against the U.S. Dollar with all other
Serikat dengan variabel lain konstan, rugi variables held constant, loss for the
untuk tahun berjalan akan lebih year ended would has
kecil/besar Rp 1.248.878.110 dan been Rp 1,248,878,110 and
Rp 1.202.862.200, terutama diakibatkan Rp 1,202,862,200 higher/lower, mainly as a
keuntungan/ kerugian yang belum result of unrealized foreign exchange
terealisasi dari penjabaran aset dan gains/losses on translation of US Dollar-
liabilitas keuangan. denominated financial assets and financial
liabilities.
- 76 -
Page 88
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
26. TUJUAN DAN KEBIJAKAN 26. FINANCIAL RISK MANAGEMENT
MANAJEMEN RISIKO KEUANGAN OBJECTIVES AND POLICIES (Continued)
(Lanjutan)
Risiko Kredit Credit Risk
Risiko kredit timbul dari kemungkinan Credit risk arises from the possibility of
ketidakmampuan pelanggan atau pihak customers or counterparties, inability to fulfill
lawan, untuk memenuhi liabilitas their contractual obligations.
kontraktualnya.
Berikut adalah eksposur maksimal Grup The table below shows the Group’s
yang terkait risiko kredit pada tanggal maximum exposures related to credit risk as
31 Desember 2025 dan 2024: of December 31, 2025 and 2024:
2025 2024
Kas dan setara kas 121.026.693 254.853.208 Cash and cash equivalents
Piutang usaha - - Trade accounts receivables
Piutang lain-lain - jangka pendek 3.000.000 740.000.000 Other accounts receivables - short-term
Aset lancar lainnya - 11.606.000.000 Other current assets
Deposito yang dibatasi penggunaannya 7.998.000.000 16.289.052.960 Restricted time deposits
Piutang lain-lain - jangka panjang 2.774.830.500 2.325.255.500 Other accounts receivables - long-term
Jumlah 10.896.857.193 31.215.161.668 Total
Risiko Likuiditas Liquidity Risk
Risiko likuiditas adalah risiko yang timbul Liquidity risk is a risk arising when the cash
dari kemungkinan Grup mengalami flow position of the Group is not enough to
kesulitan pendanaan untuk memenuhi cover the liabilities which become due.
komitmen dan liabilitas Grup kepada
pihak kreditur pada saat jatuh tempo
pembayaran.
Dalam pengelolaan risiko likuiditas, In managing the liquidity risk, management
manajemen memantau dan menjaga monitors and maintains a level of cash and
jumlah kas dan setara kas yang dianggap cash equivalents deemed adequate to
memadai untuk membiayai operasional finance the Group’s operations and to
Grup dan untuk mengatasi dampak mitigate the effects of fluctuation in cash
fluktuasi arus kas. Manajemen juga flows. Management also regularly evaluates
melakukan evaluasi berkala atas proyeksi the projected and actual cash flows,
arus kas dan arus kas aktual, termasuk including loan maturity profiles, and
jadwal jatuh tempo utang, dan terus- continuously assesses conditions in the
menerus melakukan penelaahan pasar financial markets for opportunities to obtain
keuangan untuk mendapatkan sumber optimal funding sources.
pendanaan yang optimal.
Tabel di bawah ini menganalisa liabilitas The table below analyzes the Group’s
keuangan Grup yang dikelompokkan financial liabilities into relevant maturity
berdasarkan periode yang tersisa sampai groupings based on the remaining period to
dengan tanggal jatuh tempo kontraktual. the contractual maturity date.
- 77 -
Page 89
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
26. TUJUAN DAN KEBIJAKAN 26. FINANCIAL RISK MANAGEMENT
MANAJEMEN RISIKO KEUANGAN OBJECTIVES AND POLICIES (Continued)
(Lanjutan)
Jumlah yang diungkapkan dalam tabel The amounts disclosed in the table are the
merupakan arus kas kontraktual yang contractual undiscounted cash flows:
tidak didiskontokan:
31 Desember 2025/December 31, 2025
<= 1 tahun/ > 1 Tahun/ Jumlah/
<= 1 Year > 1 Years Total
Liabilitas keuangan Financial liabilities
Utang bank jangka pendek 8.718.203.650 - 8.718.203.650 Short-term bank loan
Utang lain-lain 14.074.501.076 - 14.074.501.076 Other accounts payable
Beban akrual 18.072.241.226 - 18.072.241.226 Accrued expenses
Utang pihak berelasi non usaha 98.842.187.847 - 98.842.187.847 Due to related parties
Jumlah 139.707.133.799 - 139.707.133.799 Total
31 Desember 2024/December 31, 2024
<= 1 tahun/ > 1 Tahun/ Jumlah/
<= 1 Year > 1 Years Total
Liabilitas keuangan Financial liabilities
Utang bank jangka pendek 8.816.042.810 - 8.816.042.810 Short-term bank loan
Utang lain-lain 25.626.153.156 - 25.626.153.156 Other accounts payable
Beban akrual 15.435.193.689 - 15.435.193.689 Accrued expenses
Utang pihak berelasi non usaha 88.291.187.853 - 88.291.187.853 Due to related parties
Jumlah 138.168.577.508 - 138.168.577.508 Total
27. ASET MONETER BERSIH DALAM 27. NET MONETARY ASSETS
MATA UANG ASING DENOMINATED IN A FOREIGN
CURRENCY
Tabel berikut mengungkapkan jumlah The following table shows monetary assets:
aset moneter:
2025 2024
Mata Uang Ekuivalen Rp/ Mata Uang Ekuivalen Rp/
Asing/Original Currency Equivalent in Rp Asing/Original Equivalent in Rp
Aset Asset
Aset Lancar Current Asset
Kas dan setara kas USD 340,84 5.719.977 USD 264,69 4.277.920 Cash and cash
Jumlah Aset 5.719.977 4.277.920 Total Asset
Liabilitas Liabilities
Liabilitas Jangka Pendek Current Liabilities
Utang lain-lain USD 744.518,00 12.494.501.076 USD 744.518,00 12.032.899.916 Other accounts payables
Jumlah Liabilitas 12.494.501.076 12.032.899.916 Total Liabilities
Jumlah Liabilitias - Bersih (12.488.781.099) (12.028.621.996) Total Liabilities - Net
Pada tanggal 31 Desember 2025 dan As of December 31, 2025 and 2024, the
2024, kurs konversi yang digunakan conversion rates used by the Company
Perusahaan diungkapkan pada Catatan 2 were disclosed in Note 2 to financial
atas laporan keuangan. statements.
- 78 -
Page 90
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
28. SEGMEN OPERASI 28. OPERATING SEGMENT
Segmen operasi dilaporkan sesuai Operating segments are reported in
dengan pelaporan internal kepada accordance with the internal reporting
pembuat keputusan operasional, yang provided to the chief operating decision
bertanggung jawab atas alokasi sumber maker, which is responsible for allocating
daya ke masing-masing segmen yang resources to the reportable segments and
dilaporkan serta menilai kinerja masing- assesses its performance. The Group has
masing segmen tersebut. Grup memiliki 2 2 (two) reportable segments including
(dua) segmen yang dilaporkan meliputi trading and hydro power plant segments.
perdagangan dan pembangkit tenaga
hydro.
31 Desember 2025/December 31, 2025
Pembangkit Listrik
Perdagangan/ Tenaga Hydro/ Gabungan/
Trading Hydro Power Plant Combined
Laporan laba rugi dan penghasilan Statement of profit or loss and
komprehensif lain other comprehensive income
Pendapatan usaha - - - Operating revenues
Beban pokok pendapatan - - - Cost of operating revenues
Laba kotor - - - Gross profit
Beban usaha (5.100.387.873) (1.884.404.131) (6.984.792.004) Operating expenses
Rugi usaha (5.100.387.873) (1.884.404.131) (6.984.792.004) Operating loss
Beban lain-lain - bersih (31.795.632.020) (204.360.794.416) (236.156.426.436) Other expenses - net
Laba sebelum pajak (36.896.019.893) (206.245.198.547) (243.141.218.440) Profit before tax
Manfaat (beban) pajak - bersih (1.024.912.627) (1.205.241.981) (2.230.154.608) Tax expense (benefit) - net
Laba tahun berjalan (37.920.932.520) (207.450.440.528) (245.371.373.048) Profit for the year
Laporan posisi keuangan Statement of financial positions
Aset segmen* 76.288.773.684 208.883.467.029 285.172.240.713 Segment assets*
Liabilitas segmen** 63.770.959.018 160.427.153.902 224.198.112.920 Segment liabilities**
*) Tidak termasuk pajak dibayar dimuka dan aset pajak tangguhan/Excludes prepaid taxes and deferred tax assets
**) Tidak termasuk utang pajak/Excludes taxes payable
31 Desember 2024/December 31, 2024
Pembangkit Listrik
Perdagangan/ Tenaga Hydro/ Gabungan/
Trading Hydro Power Plant Combined
Laporan laba rugi dan penghasilan Statement of profit or loss and
komprehensif lain other comprehensive income
Pendapatan usaha - - - Operating revenues
Beban pokok pendapatan - - - Cost of operating revenues
Laba kotor - - - Gross profit
Beban usaha (10.585.641.940) (3.217.692.837) (13.803.334.777) Operating expenses
Laba usaha (10.585.641.940) (3.217.692.837) (13.803.334.777) Operating loss
Beban lain-lain - bersih (14.466.295.841) (5.860.233.754) (20.326.529.595) Other expenses - net
Laba sebelum pajak (25.051.937.781) (9.077.926.591) (34.129.864.372) Profit before tax
Manfaat (beban) pajak - bersih 1.353.956.178 836.771.878 2.190.728.056 Tax expense (benefit) - net
Laba tahun berjalan (23.697.981.603) (8.241.154.713) (31.939.136.316) Profit for the year
Laporan posisi keuangan Statement of financial positions
Aset segmen* 301.351.409.668 442.420.105.279 96.192.650.627 Segment assets*
Liabilitas segmen** 50.751.444.275 188.081.369.654 62.498.545.123 Segment liabilities**
*) Tidak termasuk pajak dibayar dimuka dan aset pajak tangguhan/Excludes prepaid taxes and deferred tax assets
**) Tidak termasuk utang pajak/Excludes taxes payable
- 79 -
Page 91
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
29. PERJANJIAN DAN IKATAN 29. AGREEMENT AND COMMITMENT
Perjanjian Penjualan Tenaga Listrik Purchase Power Agreement
Grup sebagai Produser Listrik Independen The Group as an Independent Power
memiliki 5 Perjanjian Jual Beli Listrik Producer (IPP) has 5 Power Purchase
(PJBL) dengan PT Perusahaan Listrik Agreements (PPA) with PT Perusahaan
Negara (PLN) (Persero) Unit Induk Listrik Negara (PLN) (Persero) North
Distribusi (UID) Sumatera Utara. Sumatra Main Distribution Unit (UID).
Proyek-proyek pembangkit listrik tenaga The Group's mini hydro power plant (MHPP)
mini hydro (PLTMH) Grup yang telah projects that already have PJBL are as
memiliki PJBL tersebut adalah sebagai follows:
berikut:
1. PLTMH Batang Toru-3, kapasitas 10 1. MHPP Batang Toru-3, capacity 10
Megawatts, berlokasi di Kabupaten Megawatts, located in North Tapanuli
Tapanuli Utara, sesuai PJBL tanggal Regency, in accordance with the PPA
15 Juni 2012, dan amandemen dated June 15, 2012, and the last
terakhir tanggal 11 Januari 2021. amendment dated January 11, 2021.
Jangka waktu kontrak adalah 20 The contract period is 20 (twenty)
(dua puluh) tahun sejak COD. years since Commercial On Date
Proyek ini telah mencapai Financial (COD). This project has reached
Close (FC) pada tahun 2021 dengan Financial Close (FC) in 2021 with a
target Commercial On Date (COD) target COD December 27, 2023 and
27 Desember 2023 dan saat laporan when this report was published it was
ini diterbitkan dalam proses in the process of changing the COD
perubahan target COD dari PT PLN target from PT PLN UID North
UID Sumatera Utara untuk Sumatra for extended for 24 months
diperpanjang 24 bulan lagi. again.
2. LTMH Batang Toru-4, kapasitas 10 2. MHPP Batang Toru-4, capacity 10
Megawatts, berlokasi di Kabupaten Megawatts, located in North Tapanuli
Tapanuli Utara, sesuai PJBL tanggal Regency, in accordance with the PPA
02 Agustus 2017. Periode kontrak dated August 2, 2017. The contract
selama 25 tahun sejak tercapainya period is 25 years since the
Commercial On Date (COD). Proyek achievement of Commercial On Date
ini ditargetkan akan mencapai (COD). This project is targeted to
Financing Date (FD) pada tanggal reach Financing Date (FD) on July 31,
31 Juli 2024 dan target COD pada 2024 and the COD target on July 31,
31 Juli 2026. 2026.
3. PLTMH Sisira, kapasitas 9,8 3. MHPP Sisira, capacity 9.8 Megawatts,
Megawatts, berlokasi di desa Pusuk, located in Pusuk village, Parlilitan
Kecamatan Parlilitan, Kabupaten District, Humbang Hasundutan
Humbang Hasundutan, Propinsi Regency, North Sumatra Province, in
Sumatera Utara, sesuai PJBL accordance with the PPA dated
tanggal 02 Agustus 2017. Periode August 2, 2017. The contract period is
kontrak selama 25 tahun sejak 25 years since the achievement of
tercapainya COD. Proyek ini telah COD. This project has reached its
mencapai Financing Date (FD) pada Financing Date (FD) on April 22 2022.
tanggal 22 April 2022. Karena Due to the readiness of the
kesiapan jaringan transmisi, maka transmission network, the COD will be
COD akan ditetapkan kembali. redetermined.
- 80 -
Page 92
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
29. PERJANJIAN DAN IKATAN (Lanjutan) 29. AGREEMENT AND COMMITMENT
(Continued)
Perjanjian Penjualan Tenaga Listrik Purchase Power Agreement (Continued)
(Lanjutan)
4. PLTMH Raisan Naga Timbul, 4. MHPP Raisan Naga Timbul, capacity 7
kapasitas 7 Megawatts, berlokasi di Megawatts, located in Naga Timbul
desa Naga Timbul, kecamatan village, Sitahuis sub-district, Central
Sitahuis, Kabupaten Tapanuli Tapanuli Regency, North Sumatra
Tengah, Propinsi Sumatera Utara, Province, capacity 7 Megawatts, in
kapasitas 7 Megawatts, sesuai PJBL accordance with the PPA dated
tanggal 03 Oktober 2011, dengan October 3, 2011, with a contract term
jangka waktu kontrak 20 tahun sejak of 20 years from the achievement of
tercapainya COD. Proyek ini COD. This project is targeted to reach
ditargetkan akan mencapai its Financing Date (FD) on March 31,
Financing Date (FD) pada 31 Maret 2024.
2024.
5. PLTMH Raisan Huta Dolok, 5. MHPP Raisan Huta Dolok, capacity 7
kapasitas 7 Megawatts, berlokasi di Megawatts, located in Huta Dolok
desa Huta Dolok, kecamatan village, Sitahuis sub-district, Central
Sitahuis, Kabupaten Tapanuli Tapanuli Regency, North Sumatra
Tengah, Propinsi Sumatera Utara, Province, capacity 7 Megawatts,
kapasitas 7 Megawatts, sesuai PJBL according to the PPA dated October 3,
tanggal 03 Oktober 2011, dengan 2011, with a contract term of 20 years
jangka waktu kontrak 20 tahun sejak from the achievement of COD. This
tercapainya COD. Proyek ini project is targeted to reach its
ditargetkan akan mencapai Financing Date (FD) on March 31,
Financing Date (FD) pada 31 Maret 2024.
2024.
Bank Garansi Bank Guarantee
Grup sampai dengan 31 Desember 2024 Until 31 December 2024, the Group has a
memiliki Bank Garansi dengan Jaminan Bank Guarantee with Time Deposit
Deposito Berjangka dan Setara Kas, Guarantee and Cash Equivalents, for the
untuk kepentingan Jaminan Pelaksanaan purposes of Implementation Guarantee with
dengan beneficiary PT PLN (Persero) UID the beneficiary PT PLN (Persero) UID North
Sumatera Utara, terhadap 5 (lima) proyek Sumatra, for 5 (five) PLTMH projects that
PLTMH yang telah memiliki PJBL, dengan already have PPA, with the following details:
perincian sebagai berikut :
1. Jaminan Pelaksanaan (Bank 1. Performance Bond (Bank Guarantee)
Garansi) No. BG11824316382 No. BG11824316382 Dated November
Tanggal 6 November 2024 dan 6, 2024 and Due Date December 27,
Tanggal Jatuh Tempo 27 Desember 2024, issued by PT Bank Mandiri
2024, penerbit PT Bank Mandiri (Persero) Tbk, Jakarta Puri Indah
(Persero) Tbk, Cabang Jakarta Puri Branch, with applicant PT Berkah Alam
Indah, dengan applicant PT Berkah Lestari Energi, beneficiary PT PLN UID
Alam Lestari Energi, beneficiary PT North Sumatra, for Guarantee for the
PLN UID Sumatera Utara, untuk Implementation of PLTMH Batang
Jaminan Pelaksanaan PLTMH Toru-3 with a value of
Batang Toru-3 dengan nilai Rp 6,889,740,000,-.
Rp 6.889.740.000,-.
- 81 -
Page 93
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
29. PERJANJIAN DAN IKATAN (Lanjutan) 29. AGREEMENT AND COMMITMENT
(Continued)
Bank Garansi (Lanjutan) Bank Guarantee (Continued)
Bank Garansi ini dijamin Deposito This Bank Guarantee is guaranteed by
Berjangka atas nama PT Berkah Time Deposits in the name of
Alam Lestari Energi, yang diterbitkan PT Berkah Alam Lestari Energi, issued
oleh PT Bank Mandiri (Persero) Tbk, by PT Bank Mandiri (Persero) Tbk,
Cabang Jakarta Puri Indah, dengan Jakarta Puri Indah Branch, with a
nominal Rp 6.889.740.000,- nominal value of Rp 6,889,740,000,-
2. Jaminan Pelaksanaan (Bank 2. Performance Bond (Bank Guarantee)
Garansi) Perubahan Ke-1 Bank 1st Amendment Bank Guarantee
Garansi No. RCMPG013030 No. RCMPG013030 dated March 23,
Tanggal 23 Maret 2022 dengan nilai 2022 with a value of
Rp.5.803.000.000,- yang berlaku Rp 5,803,000,000,- which is valid from
sejak 7 Maret 2022 sampai dengan March 7, 2022 to October 19, 2025.
19 Oktober 2025. Diterbitkan atas Issued at the request of PT Indah Alam
permohonan PT Indah Alam Lestari Lestari Energi , issued by PT Bank
Energi, diterbitkan oleh PT Bank UOB Indonesia, for the beneficiary of
UOB Indonesia, untuk beneficiary PT PLN (Persero) UID North Sumatra,
PT PLN (Persero) UID Sumatera as a Second Performance Bond for
Utara, sebagai Jaminan achieving COD on October 19, 2025
Pelaksanaan Kedua untuk for PLTMH Batang Toru-4. Collateral
pencapaian COD pada 19 Oktober for this Performance Bond is Counter
2025 untuk PLTMH Batang Toru-4. Guarantee Funds in the name of
Jaminan terhadap Jaminan Carbon Resilience Pte Ltd Singapore
Pelaksanaan ini adalah Counter at UOB Singapore, with a value of
Guarantee Funds atas nama Carbon 120% of the nominal value of the Bank
Resilience Pte Ltd Singapore pada Guarantee issued.
UOB Singapore, dengan nilai 120%
dari nilai nominal Bank Garansi yang
diterbitkan.
3. Jaminan Pelaksanaan (Bank 3. Performance Bond (Bank Guarantee)
Garansi) Perubahan Ke-1 Bank 1st Amendment Bank Guarantee
Garansi No. RCMPG013031 No. RCMPG013031 DATE March 23,
Tanggal 23 Maret 2022 dengan nilai 2022 with a value of Rp
Rp 5.803.000.000,- yang berlaku 5,803,000,000,- which is valid from
sejak 7 Maret 2022 sampai dengan March 7, 2022 to October 19, 2025.
19 Oktober 2025. Diterbitkan atas Issued at the request of PT Indah Alam
permohonan PT Indah Alam Lestari Lestari Energi , issued by PT Bank
Energi, diterbitkan oleh PT Bank UOB Indonesia, for the beneficiary of
UOB Indonesia, untuk beneficiary PT PLN (Persero) UID North Sumatra,
PT PLN (Persero) UID Sumatera as the Third Performance Bond for
Utara, sebagai Jaminan achieving COD on 19 October 2025 for
Pelaksanaan Ketiga untuk PLTMH Batang Toru-4.
pencapaian COD pada 19 Oktober
2025 untuk PLTMH Batang Toru-4.
- 82 -
Page 94
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
29. PERJANJIAN DAN IKATAN (Lanjutan) 29. AGREEMENT AND COMMITMENT
(Continued)
Bank Garansi (Lanjutan) Bank Guarantee (Continued)
Jaminan terhadap Bank Garansi ini The collateral for this Bank Guarantee
adalah Counter Guarantee Funds is Counter Guarantee Funds in the
atas nama Carbon Resilienace Pte name of Carbon Resilienace Pte Ltd
Ltd Singapore pada UOB Singapore, Singapore at UOB Singapore, with a
dengan nilai 120% dari nilai nominal value of 120% of the nominal value of
Bank Garansi yang diterbitkan. the Bank Guarantee issued.
4. Jaminan Pelaksanaan (Bank 4. Performance Bond (Bank Guarantee)
Garansi) No. MBG774023605319N No. MBG774023605319N Jakarta,
Jakarta, 27 Juni 2019 dan Tanggal 27 June 2019 and Due Date
Jatuh Tempo 26 November 2026, November 26, 2026 with a nominal
dengan nominal Rp 3.998.981.175,- value of Rp 3,998,981,175,- This Bank
Bank Garansi ini diterbitkan atas Guarantee is issued at the request of
permintaan PT Energi Alam PT Energi Alam Sentosa, with
Sentosa, dengan beneficiary PT PLN beneficiary PT PLN (Persero) UID
(Persero) UID Sumatera Utara, North Sumatra, for Guarantee for the
untuk Jaminan Pelaksanaan PLTMH Performance Bond of MHPP Sisira,
Sisira, yang dijamin dengan which is guaranteed by a Time Deposit
Deposito Berjangka atas nama in the name of PT Energi Alam
PT Energi Alam Sentosa pada Sentosa at PT Bank Mandiri (Persero)
PT Bank Mandiri (Persero) Tbk, Tbk, Jakarta Puri Indah Branch, with
Cabang Jakarta Puri Indah, dengan the same nominal value as Bank
nilai nominal yang sama dengan Guarantee.
Bank Garansinya.
5. Jaminan Pelaksanaan (Bank 5. Performance Bond (Bank Guarantee)
Garansi) No.MBG774023606919N No. MBG774023606919N Jakarta,
Jakarta, 27 Juni 2019 dan Tanggal 27 June 2019 and Due Date
Jatuh Tempo 26 November 2026,, November 26, 2026 with a nominal
dengan nominal Rp 3.998.981.175,- value of Rp 3,998,981,175,- This Bank
Bank Garansi ini diterbitkan atas Guarantee is issued at the request of
permintaan PT Energi Alam PT Energi Alam Sentosa, with the
Sentosa, dengan beneficiary PT PLN beneficiary PT PLN (Persero) UID
(Persero) UID Sumatera Utara, North Sumatra, for Guarantee for the
untuk Jaminan Pelaksanaan PLTMH Performance Bond of the Sisira
Sisira, yang dijamin dengan PLTMH, which is guaranteed by a
Deposito Berjangka atas nama Time Deposit in the name of PT Energi
PT Energi Alam Sentosa pada Alam Sentosa at PT Bank Mandiri
PT Bank Mandiri (Persero) Tbk, (Persero) Tbk, Branch Jakarta Puri
Cabang Jakarta Puri Indah, dengan Indah, with the same nominal value as
nilai nominal yang sama dengan the Bank Guarantee.
Bank Garansinya.
- 83 -
Page 95
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
29. PERJANJIAN DAN IKATAN (Lanjutan) 29. AGREEMENT AND COMMITMENT
(Continued)
Bank Garansi (Lanjutan) Bank Guarantee (Continued)
6. Jaminan Pelaksanaan (Bank 6. Performance Bond (Bank Guarantee)
Garansi) No. BG11824316292 No. BG11824316292 Jakarta,
Jakarta, 6 November 2024, Bank November 6, 2024, this Bank
Garansi akan berakhir pada tanggal Guarantee will end on December 27,
27 Desember 2024, dengan nominal 2024, with a nominal value of Rp
Rp 699.906.480,- Bank Garansi ini 699,906,480,- This Bank Guarantee is
diterbitkan atas permintaan issued on request from PT Sumber
PT Sumber Alam Energi Hidro, Alam Energi Hidro, with the beneficiary
dengan beneficiary PT PLN PT PLN (Persero) UID North Sumatra,
(Persero) UID Sumatera Utara, for a Guarantee for the Performance
untuk Jaminan Pelaksanaan Bond for the Achievement of the
Pencapaian Tanggal Pembiayaan Financing Date (FD) of MHPP Raisan
PLTMH Raisan Huta Dolok, yang Huta Dolok, which is guaranteed by a
dijamin dengan Deposito Berjangka Time Deposit in the name of PT
atas nama PT Sumber Alam Energi Sumber Alam Energi Hidro at PT Bank
Hidro pada PT Bank Mandiri Mandiri (Persero) Tbk, Jakarta Puri
(Persero) Tbk, Cabang Jakarta Puri Branch Beautiful, with the same
Indah, dengan nilai nominal yang nominal value as the Bank Guarantee.
sama dengan Bank Garansinya.
7. Jaminan Pelaksanaan (Bank 7. Performance Bond (Bank Guarantee)
Garansi) No. BG11824316253, No. BG11824316253, issued in
diterbitkan di Jakarta 6 November Jakarta November 6, 2024, this Bank
2024, Bank Garansi ini akan berakhir Guarantee will end on December 27,
pada tanggal 27 Desember 2024, 2024, with a nominal value of
dengan nominal Rp 699.906.480,-. Rp 699,906,480,-. This Bank
Bank Garansi ini diterbitkan atas Guarantee was issued at the request
permintaan PT Sumber Alam Energi of PT Sumber Alam Energi Hidro, with
Hidro, dengan beneficiary PT PLN the beneficiary PT PLN (Persero) UID
(Persero) UID Sumatera Utara, North Sumatra, as a Guarantee for the
untuk Jaminan Pelaksanaan Achievement of the Financing Date
Pencapaian Tanggal Pembiayaan (FD) for MHPP Raisan Naga Timbul,
PLTMH Raisan Naga Timbul, yang which is guaranteed by a Time Deposit
dijamin dengan Deposito Berjangka in the name of PT Sumber Alam
atas nama PT Sumber Alam Energi Energi Hidro at PT Bank Mandiri
Hidro pada PT Bank Mandiri (Persero) Tbk, Jakarta Puri Indah
(Persero) Tbk, Cabang Jakarta Puri Branch, with the same nominal value
Indah, dengan nilai nominal yang as the Bank Guarantee.
sama dengan Bank Garansinya.
- 84 -
Page 96
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
30. PENGUNGKAPAN TAMBAHAN 30. SUPPLEMENTAL DISCLOSURE ON
LAPORAN ARUS KAS STATEMENT OF CASH FLOWS
Aktivitas investasi dan pendanaan yang The following is the noncash investing and
tidak mempengaruhi kas: financing activity of the Group:
2025 2024
Penambahan aset tetap melalui Additional of fixed assets trough
reklassifikasi uang muka (3.867.599.999) (20.900.253.600) reclassification of advances
Penambahan aset tetap melalui Additional of fixed assets trough
utang pihak berelasi non usaha - (50.000.000) due to related parties
Penjualan aset tetap melalui Sale of fixed assets trough
utang pembelian aset tetap - (5.418.871.619) purchase fixed assets payables
31. RENCANA BISNIS 31. BUSINESS PLAN
Laporan keuangan terlampir disusun The accompanying financial statements
dengan anggapan Grup akan melanjutkan have been prepared assuming that the
operasinya sebagai entitas yang Group will continue to operate as going
berkemampuan untuk mempertahankan concern entities. The Group has incurred
hidupnya. Grup mengalami kerugian net loss of Rp 259,517,560,260 in 2025 and
bersih sebesar Rp 259.517.560.260 pada resulting deficit of Rp 272,407,947,388 as of
tahun 2025 sehingga menyebabkan defisit December 31, 2025.
sebesar Rp 272.407.947.388 pada
tanggal 31 Desember 2025.
Untuk mengatasi kondisi tersebut, To mitigate the above conditions,
manajemen melakukan langkah-langkah management performs the plans and
sebagai berikut: actions as follows:
1. Mendapatkan Mitra Strategis yang 1. Obtaining Strategic Partners who have
memiliki Visi dan Misi yang sesuai a Vision and Mission that is in line with
dengan Visi dan Misi the Vision and Mission of the Company
Manajemen Perusahaan untuk Management to develop Renewable
mengembangkan Renewable Energy in Indonesia.
Energy di Indonesia.
2. Mempersiapkan Aksi Korporasi 2. Preparing Corporate Action to accept
untuk menerima masuknya Mitra the entry of Strategic Partners into the
Strategis dalam struktur company's ownership structure
kepemilikan perseroan melalui through a rights issue mechanism.
mekanisme rights issue.
- 85 -
Page 97
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
31. RENCANA BISNIS (Lanjutan) 31. BUSINESS PLAN (Continued)
3. Mendapatkan kontrak operating 3. Securing a hydropower plant
maintenance hydropower plant operations and maintenance contract
untuk memperoleh pendapatan to generate revenue, in line with the
sesuai dengan visi misi Company's vision and mission of
Perusahaan yaitu memiliki deriving income from activities related
penghasilan dari aktifitas yang to green energy projects.
berkaitan dengan proyek green
energy.
4. Membangun seluruh proyek 4. Building all Company projects, both
Perusahaan, baik Mini Hydro Mini Hydro Power Plants and Large
Power Plant, maupun Large Hydro Hydro Power Plants that are already in
Power Plant yang telah berada the Company's portfolio. The focus of
dalam portfolio Perusahaan. Fokus development is mainly on 5 (five) Mini
pembangunan terutama pada Hydro Power Plant projects that
5 (lima) proyek Mini Hydro Power already have a Power Purchase
Plant yang telah memiliki Power Agreement (PPA) with PT PLN UID
Purcahse Agreement (PPA) North Sumatra, with a total capacity of
dengan PT PLN UID Sumatera 43.8 megawatts.
Utara, dengan total kapasitas 43,8
megawatts.
5. Mempersiapkan pembangunan 2 5. Preparing the construction of 2 (two)
(dua) Large Hydro Power Plants di Large Hydro Power Plants in
Propinsi Nanggroh Aceh Nanggroh Aceh Darussalam Province
Darussalam dengan total kapasitas with a total capacity of 467 Megawatts,
467 Megawatts, dengan target with an operational target of August
operasional Agustus 2033. 2033.
6. Melakukan akuisisi greenfield large 6. Acquiring greenfield large hydro power
hydro power plants di wilayah plants in the Aceh region, to achieve
Aceh, untuk mencapai target the company's portfolio target in the
portfolio perseroan pada segment hydro power plant segment of 1,000
hydro power plant menjadi 1.000 megawatts.
megawatts.
32. STANDAR AKUNTANSI KEUANGAN 32. NEW FINANCIAL ACCOUNTING
BARU DAN PERUBAHANNYA STANDARDS AND ADJUSTMENT OF
FINANCIAL STATEMENTS
Diterapkan pada tahun 2025 Adopted during 2025
Penerapan amendemen PSAK No. 221, The implementation of amendments to
Pengaruh Perubahan Kurs Valuta Asing, PSAK No. 221, The Effect of Changes in
terkait kondisi ketika suatu mata uang Foreign Exchange Rates, regarding to
tidak tertukarkan, yang berlaku efektif conditions when a currency is not
1 Januari 2025 dan relevan bagi exchangeable, which is effective from
Perusahaan, tidak menyebabkan January 1, 2025 and relevant for the
perubahan material terhadap jumlah- Company, had no material impact on the
jumlah yang dilaporkan dalam laporan amounts reported in the financial
keuangan. statements.
- 86 -
Page 98
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan) FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir For the the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan Dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
32. STANDAR AKUNTANSI KEUANGAN 32. NEW FINANCIAL ACCOUNTING
BARU DAN PERUBAHANNYA STANDARDS AND ADJUSTMENT OF
(Lanjutan) FINANCIAL STATEMENTS (Continued)
Telah diterbitkan namun belum berlaku Issued but not yet effective
efektif
Standar baru dan amendemen standar Amendments to financial accounting
akuntansi keuangan yang telah diterbitkan standard issued that are mandatory for the
yang bersifat wajib untuk tahun buku yang financial year beginning or after:
dimulai pada atau setelah:
1 Januari 2026 January 1, 2026
- Amendemen PSAK No. 109, - Amendment to PSAK No. 109, Financial
Instrumen Keuangan dan PSAK No. Instruments, and PSAK No. 107,
107, Instrumen Keuangan: Financial Instrument: Disclosure, about
Pengungkapan, tentang klasifikasi dan classification and measurement of
pengukuran instrument keuangan financial instruments
1 Januari 2027 January 1, 2027
- PSAK No. 118, Penyajian dan - PSAK No. 118, Presentation and
Pengungkapan dalam Laporan Disclosure in Financial Statements
Keuangan
Grup masih mengevaluasi dampak The Group is still evaluating the effects of
penerapan amandemen PSAK di atas dan this amendment to PSAK and has not yet
dampak terhadap laporan keuangan determined the related effects on the
konsolidasian dari penerapan amandemen consolidated financial statements.
PSAK tersebut belum dapat ditentukan.
33. PENYELESAIAN LAPORAN 33. COMPLETION OF THE CONSOLIDATED
KEUANGAN KONSOLIDASIAN FINANCIAL STATEMENTS
Manajemen Grup bertanggung jawab atas The Group's management is responsible for
penyusunan laporan keuangan untuk the preparation of the financial statements
tahun yang berakhir tanggal 31 Desember for the year ended December 31, 2025,
2025, yang diselesaikan pada tanggal which were completed on August XX, 2026.
XX Agustus 2026.
********
- 87 -
Page 99
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
ENTITAS INDUK TERSENDIRI PARENT COMPANY ONLY
LAPORAN POSISI KEUANGAN STATEMENT OF FINANCIAL POSITIONS
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
2025 2024
ASET ASSETS
ASET LANCAR CURRENT ASSETS
Bank 7.608.031 124.321.519 Cash in banks
Piutang usaha dari pihak ketiga - Trade accounts receivable from
setelah dikurangi penurunan nilai Third parties - net off allowance
masing-masing sebesar Nihil for impariment of Nil
dan Rp 5.516.808.508 pada tanggal and Rp 5,516,808,508 as of
31 Desember 2025 dan 2024 - - December 31, 2025 and 2024, respectively
Piutang lain-lain dari pihak ketiga Other accounts receivable from third party
setelah dikurangi penurunan nilai - Net off allowance
sebesar Rp 271.880.000 pada for impariment of Rp 271,880,000
tanggal 31 Desember 2025 - 500.000.000 as of December 31, 2025
Pajak dibayar dimuka 5.320.897 6.209.327 Prepaid tax
Uang muka jangka pendek 36.880.000 - Short-term advances
Jumlah Aset Lancar 49.808.928 630.530.846 Total Current Assets
ASET TIDAK LANCAR NONCURRENT ASSETS
Investasi dalam saham 259.974.000.000 259.974.000.000 Investment in stocks
Piutang lain-lain dari pihak berelasi 76.297.870.236 93.162.663.596 Other accounts receivable from related parties
Uang muka jangka panjang - - Long-term advances
Aset pajak tangguhan 656.209.204 1.723.536.039 Deferred tax assets
Aset tetap - setelah dikurangi Fixed assets - net of
akumulasi penyusutan masing-masing accumulated depreciation of
sebesar Rp 864.796.603 dan Rp 864,796,603 and
Rp 850.649.728 masing-masing Rp 850,649,728 as of
pada tanggal 31 Desember 2025 December 31, 2025
dan 2024 - 258.984.458 and 2024, respectively
Jumlah Aset Tidak Lancar 336.928.079.440 355.119.184.093 Total Noncurrent Assets
JUMLAH ASET 336.977.888.368 355.749.714.939 TOTAL ASSETS
-i-
Page 100
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
ENTITAS INDUK TERSENDIRI PARENT COMPANY ONLY
LAPORAN POSISI KEUANGAN (Lanjutan) STATEMENT OF FINANCIAL POSITIONS (Continued)
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
2025 2024
LIABILITAS DAN EKUITAS LIABILITIES AND EQUITY
LIABILITAS JANGKA PENDEK CURRENT LIABILITIES
Utang bank jangka pendek 8.718.203.650 8.816.042.810 Short-term bank loan
Utang lain-lain kepada Other accounts payable to
pihak ketiga 1.500.000.000 1.728.120.000 third parties
Utang pajak 9.893.003.983 3.913.790.420 Taxes payable
Beban akrual 6.579.062.332 4.557.163.623 Accrued expenses
Utang pihak berelasi non usaha 44.262.803.933 33.332.671.635 Due to related parties
Jumlah Liabilitas Jangka Pendek 70.953.073.898 52.347.788.488 Total Current Liabilities
LIABILITAS JANGKA PANJANG NONCURRENT LIABILITIES
Liabilitas imbalan kerja jangka panjang 2.710.889.102 2.317.446.207 Long-term employee benefits liability
Jumlah Liabilitas Jangka Panjang 2.710.889.102 2.317.446.207 Total Noncurrent Liabilities
Jumlah Liabilitas 73.663.963.000 54.665.234.695 Total Liabilities
EKUITAS EQUITY
Ekuitas yang dapat Diatribusikan Equity Attributable to Owners
kepada Pemilik Entitas Induk of the Company
Modal saham Capital stock
Modal dasar - 8.800.000.000, Authorized - 10,750,000,000,
saham dengan nilai nominal and 100,000 shares with
Rp 100 masing-masing pada Rp 100 par value per share as of
tanggal 31 Desember 2025 December 31, 2025 and 2024,
dan 2024 respectively
Modal ditempatkan dan disetor - Issued and paid-up -
2.750.000.000 masing-masing 2,750,000,000 share as of
pada tanggal 31 Desember 2025 December 31, 2025 and 2024,
dan 2024 275.000.000.000 275.000.000.000 respectively
Tambahan modal disetor 46.574.881.122 46.574.881.122 Additional paid-in capital
Defisit (58.260.955.754) (20.490.400.878) Deficit
Jumlah Ekuitas 263.313.925.368 301.084.480.244 Total Equity
JUMLAH LIABILITAS DAN EKUITAS 336.977.888.368 355.749.714.939 TOTAL LIABILITIES AND EQUITY
- ii -
Page 101
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
ENTITAS INDUK TERSENDIRI PARENT COMPANY ONLY
LAPORAN LABA RUGI DAN PENGHASILAN STATEMENTS OF PROFIT OR LOSS
KOMPREHENSIF LAIN AND OTHER COMPREHENSIVE INCOME
Untuk Tahun-tahun Yang Berakhir For the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
2025 2024
PENDAPATAN USAHA - - OPERATING REVENUES
BEBAN POKOK PENDAPATAN - - COST OF REVENUES
LABA KOTOR - - GROSS PROFIT
BEBAN USAHA OPERATING EXPENSES
Umum dan administrasi (5.100.387.873) (10.585.641.940) General and administrative
RUGI USAHA (5.100.387.873) (10.585.641.940) OPERATING LOSS
PENGHASILAN (BEBAN) LAIN-LAIN OTHER INCOME (EXPENSES)
Keuntungan penjualan aset tetap (21.000.000) - Gain on sale of fixed assets
Pendapatan bunga 19.948 1.040.313 Interest income
Beban bunga dan keuangan lainnya (782.443.595) (1.675.681.814) Interest and other financial charges
Beban pajak (10.102.118.705) (33.591.009) Tax expenses
Lain-lain (20.890.089.669) (4.517.732.732) Others
Beban lain-lain - Bersih (31.795.632.021) (6.225.965.242) Other Expenses - Net
RUGI SEBELUM PAJAK (36.896.019.894) (16.811.607.182) LOSS BEFORE TAX
BEBAN PAJAK (1.024.912.627) 1.353.956.178 TAX EXPENSE
RUGI TAHUN BERJALAN (37.920.932.521) (15.457.651.004) LOSS FOR THE YEAR
PENGHASILAN OTHER COMPREHENSIVE
KOMPREHENSIF LAIN 150.377.645 21.096.024 INCOME
JUMLAH RUGI TOTAL COMPREHENSIVE
KOMPREHENSIF (37.770.554.876) (15.436.554.980) LOSS
- iii -
Page 102
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
ENTITAS INDUK TERSENDIRI PARENT COMPANY ONLY
LAPORAN PERUBAHAN EKUITAS STATEMENT OF CHANGES IN EQUITY
Untuk Tahun-tahun yang Berakhir For the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
Modal Ditempatkan Tambahan Modal Saldo Laba (Defisit)/
dan Disetor/Issued Disetor/Additional Retained Earnings
and Paid-up Capital paid-in capital (Deficit) Jumlah/Total
Saldo pada tanggal 1 Januari 2024 275.000.000.000 46.574.881.122 (5.053.845.898) 316.521.035.224 Balance as of January 1, 2024
Rugi komprehensif Loss comprehensive
Rugi tahun berjalan - - (15.457.651.004) (15.457.651.004) Loss for the year
Penghasilan komprehensif lain - - 21.096.024 21.096.024 Other comprehensive income
Jumlah penghasilan komprehensif - - (15.436.554.980) (15.436.554.980) Total comprehensive income
Saldo pada tanggal 31 Desember 2024 275.000.000.000 46.574.881.122 (20.490.400.878) 301.084.480.244 Balance as of December 31, 2024
Rugi komprehensif Loss comprehensive
Rugi tahun berjalan - - (37.920.932.521) (37.920.932.521) Loss for the year
Penghasilan komprehensif lain - - 150.377.645 150.377.645 Other comprehensive income
Jumlah penghasilan komprehensif - - (37.770.554.876) (37.770.554.876) Total comprehensive income
Saldo pada tanggal 31 Desember 2025 275.000.000.000 46.574.881.122 (58.260.955.754) 263.313.925.368 Balance as of December 31, 2025
- iv -
Page 103
PT TERREGRA ASIA ENERGY Tbk PT TERREGRA ASIA ENERGY Tbk
ENTITAS INDUK TERSENDIRI PARENT COMPANY ONLY
LAPORAN ARUS KAS STATEMENTS OF CASH FLOW
Untuk Tahun-tahun yang Berakhir For the Years Ended
31 Desember 2025 dan 2024 December 31, 2025 and 2024
(Angka-angka Disajikan dalam Rupiah, (Figures are Presented in Rupiah,
kecuali Dinyatakan Lain) unless Otherwise Stated)
2025 2024
ARUS KAS DARI CASH FLOWS FROM
AKTIVITAS OPERASI OPERATING ACTIVITIES
Penerimaan dari pelanggan - 1.837.379.953 Cash receipts from customers
Pembayaran kepada pemasok Cash paid to suppliers
dan lainnya (7.229.203.341) (8.882.023.740) and others
Kas Bersih Digunakan untuk Net Cash Used in
Aktivitas Operasi (7.229.203.341) (7.044.643.787) Operating Activities
ARUS KAS DARI CASH FLOWS FROM
AKTIVITAS INVESTASI INVESTING ACTIVITIES
Penerimaan bunga 19.948 1.040.313 Interest received
Perolehan aset tetap - (240.000.000) Acquisitions of fixed assets
Hasil penjualan aset tetap 194.000.000 - Proceeds from sale of fixed assets
Kas Bersih Diperoleh dari (Digunakan Net Cash Provided by (Used
untuk) Aktivitas Investasi 194.019.948 (238.959.687) in) Investing Activities
ARUS KAS DARI CASH FLOWS FROM
AKTIVITAS PENDANAAN FINANCING ACTIVITIES
Penerimaan utang pihak Due to related parties
berelasi non usaha 7.700.913.500 8.386.111.077 received
Pembayaran Beban bunga dan Payment of Interest and other
keuangan lainnya (782.443.595) (1.675.681.814) financial charges
Kas Bersih Diperoleh dari Net Cash Provided by
Aktivitas Pendanaan 6.918.469.905 6.710.429.263 Financing Activities
PENURUNAN BERSIH BANK (116.713.488) (573.174.211) NET DECREASE IN CASH IN BANKS
BANK CASH IN BANKS AT
AWAL TAHUN 124.321.519 697.495.730 THE BEGINNING OF THE YEAR
BANK CASH IN BANKS AT
AKHIR TAHUN 7.608.031 124.321.519 THE END OF THE YEAR
-v-
Names mentioned 72 people and organisations named in the text · linked when the evidence is strong
unresolved
org
PT Terregra
p.4 ×3
unresolved
org
PT Terregra Asia Energy Anaknya
p.7
unresolved
org
Irwanto & Rekan
p.11
unresolved
org
Rekan Nino Berlianto
p.11
unresolved
org
PT Mitra Megatama Perkasa
p.18 ×3
unresolved
person
T. Francisca Teresa N.
p.18 ×2
unresolved
org
Menteri Kehakiman
p.18
unresolved
org
Minister of Justice and Human Rights
p.18
unresolved
org
PT Mitra Megatama
p.18
unresolved
person
Humberg Lie
p.18 ×3
unresolved
org
Minister of Law and Human Rights
p.18
unresolved
org
Menteri Hukum dan Hak Asasi
p.18
unresolved
org
Minister of Law Anggaran Dasar
p.18
unresolved
org
Menteri
p.18
unresolved
—
berkedudukan di
p.19
unresolved
org
Financial Services Authority
p.19
unresolved
—
S208/D.04/2017
p.19
unresolved
—
Megatama
p.19
unresolved
org
Indonesia Stock Exchange
p.19
unresolved
org
PT Terregra Hydro Power
p.20 ×17
unresolved
org
PT Sumber Alam Energi Hidro
p.20 ×10
unresolved
org
PT Cahaya Abadi Lestari Energi
p.20 ×10
unresolved
org
PT Karya Alam Lestari Energi
p.20 ×10
unresolved
org
PT Berkah Alam Lestari Energi
p.20 ×12
unresolved
org
PT Energi Alam Sentosa
p.20 ×12
unresolved
org
PT Indah Alam Lestari Energi
p.20 ×10
unresolved
org
PT Karya Abadi Lestari Energi
p.20 ×10
unresolved
org
PT Borneo Hydro Electric
p.20 ×7
unresolved
org
PT Musi Hydro Electric
p.20 ×7
unresolved
org
PT Teunom Hidro Power
p.20 ×7
unresolved
org
PT Meutia Hidro Perkasa
p.20 ×7
unresolved
org
PT MYI Hidro Power
p.20 ×8
unresolved
org
PT MYI Energi Lestari
p.20 ×8
unresolved
org
PT EAS
p.21 ×3
unresolved
org
PT BALE
p.21 ×4
unresolved
org
PT IALE
p.21 ×2
unresolved
org
PT SAEH
p.21 ×2
unresolved
person
Soebangil
p.24
unresolved
person
R.M. Dendy Soebangil
p.24
unresolved
person
Ir. Ngurah Adyana
p.24
unresolved
org
Bapepam-LK
p.25 ×4
unresolved
org
PT Sinergi Bangun Utama
p.63 ×2
unresolved
org
PT Dwi Mutiara Sejahtera
p.63
unresolved
org
PT Dwi Mutiara Sejahtera Lain-lain
p.63
unresolved
org
PT Solarion Energi Alam
p.64
unresolved
org
PT Solarion Energi Alam Lain-lain
p.64
unresolved
org
PT Bank UOB
p.66
unresolved
org
Bank BCA
p.71 ×4
unresolved
org
Bank Garansi
p.71
unresolved
org
PTE Carbon Ressilience LTD
p.72 ×2
unresolved
org
PTE Carbon PTE Carbon Ressilience LTD
p.73
unresolved
org
Ressilience. LTD
p.73
unresolved
org
PT Terregra Asia Equity Djani Sutedja
p.74 ×2
unresolved
org
PT Terregra Hydro
p.76 ×2
unresolved
org
PT Berkah
p.76
unresolved
org
PT EAS Selisih
p.77
unresolved
org
PT Terregra Hydro Power Kepemilikan
p.77 ×3
unresolved
org
PT Terregra Asia Equity Iwan Sugiarjo
p.85
Extraction attempts how the parser did, and what it refused
Nothing structured was extracted from this document — the attempts below say why.
No extraction attempted yet.