Back to announcement
20250110_DAAZ_Laporan Penggunaan Dana Hasil Penawaran Umum_31844909.pdf
Other Text extracted DAAZSource file signed link, expires in 15 minutes
Extracted text 10
Page 1
Go To English Page
Nomor Surat 001/DIR-I/2024
Nama Perusahaan PT Daaz Bara Lestari Tbk
Kode Emiten DAAZ
Lampiran 1
Perihal Laporan Penggunaan Dana Hasil Penawaran Umum
Dana yang diperoleh dari Penawaran Umum IDR
Rencana Realisasi
Jumlah
Biaya Hasil Penggunaa Penggunaa
Hasil
Jenis Penawaran Realisasi n Dana n Dana Sisa Dana
Tanggal Penawaran
Penawaran Nama Emisi Umum Bersih Menurut Menurut (satuan
Efektif Umum
Umum (satuan mata (satuan Prospektus Prospektus mata uang)
(satuan
uang) mata uang) (satuan (satuan
mata uang)
mata uang) mata uang)
11
264.000.000. 6.761.076.50 257.238.923. 257.238.923. 257.238.923.
IPO Saham DAAZ November 0
000 0 500 500 500
2024
Penempatan Sisa Dana
Jenis
Kode Nama
Penawaran Penempatan List
Efek
Umum
IPO Saham DAAZ
Page 2
Rincian Rencana Penawaran Umum
Jenis
Kode Nama
Penawaran Tanggal Efektif Rencana List
Efek
Umum
Hasil
Realisasi Jumlah
Bersih Uraian (satuan mata Persentase
(satuan mata uang)
uang)
Pembelian Bijih
84.562.768.696 Nikel oleh 84.562.768.696 100 %
Perseroan
Modal Kerja
1.200.688.399 1.200.688.399 100 %
Perseroan
Pinjaman
Kepada Entitas
Anak (PT. Bara
Makmur
84.022.978.538 84.022.978.538 100 %
Dwitama) -
Pembelian
Batubara oleh
Entitas Anak
11 November Pinjaman
IPO Saham DAAZ Kepada Entitas
2024
Anak (PT. Bara
1.714.754.664 Makmur 1.714.754.664 100 %
Dwitama) -
Modal Kerja
Entitas Anak
Pinjaman
Kepada Entitas
Anak (PT. Indo
Lautan Energi) -
84.880.355.871 84.880.355.871 100 %
Pembelian
Bahan Bakar
Solar oleh
Entitas Anak
Pinjaman
Kepada Entitas
Anak (PT. Indo
857.377.332 857.377.332 100 %
Lautan Energi) -
Modal Kerja
Entitas Anak
Page 3
Rincian Realisasi Penawaran Umum
Jenis
Kode Nama
Penawaran Tanggal Efektif Realisasi List
Efek
Umum
Hasil
Realisasi Jumlah
Bersih Uraian (satuan mata Persentase
(satuan mata uang)
uang)
Pembelian Bijih
84.562.768.696 Nikel oleh 84.562.768.696 100 %
Perseroan
Modal Kerja
1.200.688.399 1.200.688.399 100 %
Perseroan
Pinjaman
Kepada Entitas
Anak (PT. Bara
Makmur
84.022.978.538 84.022.978.538 100 %
Dwitama) -
Pembelian
Batubara oleh
Entitas Anak
11 November Pinjaman
IPO Saham DAAZ Kepada Entitas
2024
Anak (PT. Bara
1.714.754.664 Makmur 1.714.754.664 100 %
Dwitama) -
Modal Kerja
Entitas Anak
Pinjaman
Kepada Entitas
Anak (PT. Indo
Lautan Energi) -
84.880.355.871 84.880.355.871 100 %
Pembelian
Bahan Bakar
Solar oleh
Entitas Anak
Pinjaman
Kepada Entitas
Anak (PT. Indo
857.377.332 857.377.332 100 %
Lautan Energi) -
Modal Kerja
Entitas Anak
Page 4
Rincian Biaya Penawaran Umum
Jenis Jumlah Jumlah
Tanggal Persenta
Penawaran Kode Efek Hasil Uraian (Satuan Mata
Efektif se
Umum Penawaran Uang)
IPO Saham DAAZ 11 November 264.000.000.00a. biaya jasa penjaminan
2024 0 (underwriting fee);
750.000.000 0,28 %
b. biaya jasa
penyelenggaraan
2.250.000.000 0,85 %
(management fee);
c. biaya jasa penjualan
(selling fee);
912.120.000 0,35 %
d. biaya jasa profesi
penunjang pasar modal;
2.242.500.000 0,85 %
e. biaya jasa lembaga
penunjang pasar modal;
35.000.000 0,01 %
dan
f. biaya jasa konsultasi
keuangan (financial
0 0 %
advisory fee).
g. Biaya lain-lain yang
dapat diatribusikan
571.456.500 0,22 %
langsung sebagai biaya
emisi***)
Demikian untuk diketahui.
Hormat Kami,
PT Daaz Bara Lestari Tbk
Yulianti
Chief of Investor Relations
PT Daaz Bara Lestari Tbk
Gedung Office 8, Lantai 21 Unit E dan F, Jl. Senopati No. 8B, Senayan, Kebayoran
Telepon : (021) 2933 3203, Fax : , http://www.daaz-group.com/
Nama Pengirim Yulianti
Jabatan Chief of Investor Relations
Tanggal dan Waktu 10-01-2025 17:05
Lampiran 1. 250110 Lamp - Laporan Penggunaan Dana Hasil IPO.pdf
Page 5
Dokumen ini merupakan dokumen resmi PT Daaz Bara Lestari Tbk yang tidak memerlukan tanda tangan karena
dihasilkan secara elektronik oleh sistem pelaporan elektronik. PT Daaz Bara Lestari Tbk bertanggung jawab penuh
atas informasi yang tertera didalam dokumen ini.
Page 6
Go To Indonesian Page
Announcement Number 001/DIR-I/2024
Issuer Name PT Daaz Bara Lestari Tbk
Issuer Code DAAZ
Attachment 1
Subject Laporan Penggunaan Dana Hasil Penawaran Umum
Fund received form the public offering IDR
Amount of Plan for use Realized
Proceed Cost of of proceed Use of Fund
Type of Net Remaining
Name of from the Public according to according to
public Listing Date Realization Fund (in
Issuance Public Offering (in the the
offering (in Currency) Currency)
Offering (in Currency) Prospectus Prospectus
Currency) (in Currency) (in Currency)
264,000,000, 6,761,076,50 257,238,923, 257,238,923, 257,238,923,
IPO Saham DAAZ 0
000 0 500 500 500
Allocation of Remaining Fund
Type of public Name / Code of
List of allocation
offering Securities
IPO Saham DAAZ
Page 7
Details of Public Offering Plan
Type of public Name / Code of
Listing date List of plans
offering Securities
Net Realization Amount (in
Description Percentage
(in Currency) Currency)
Pembelian Bijih
84,562,768,696 Nikel oleh 84,562,768,696 100 %
Perseroan
Modal Kerja
1,200,688,399 1,200,688,399 100 %
Perseroan
Pinjaman
Kepada Entitas
Anak (PT. Bara
Makmur
84,022,978,538 84,022,978,538 100 %
Dwitama) -
Pembelian
Batubara oleh
Entitas Anak
Pinjaman
IPO Saham DAAZ Kepada Entitas
Anak (PT. Bara
1,714,754,664 Makmur 1,714,754,664 100 %
Dwitama) -
Modal Kerja
Entitas Anak
Pinjaman
Kepada Entitas
Anak (PT. Indo
Lautan Energi) -
84,880,355,871 84,880,355,871 100 %
Pembelian
Bahan Bakar
Solar oleh
Entitas Anak
Pinjaman
Kepada Entitas
Anak (PT. Indo
857,377,332 857,377,332 100 %
Lautan Energi) -
Modal Kerja
Entitas Anak
Page 8
Details of Public Offering Realization
Type of Public Name / Code of
Listing Date Realization Plan
Offering Securities
Net Realization Amount (in
Description Percentage
(in Currency) Currency)
Pembelian Bijih
84,562,768,696 Nikel oleh 84,562,768,696 100 %
Perseroan
Modal Kerja
1,200,688,399 1,200,688,399 100 %
Perseroan
Pinjaman
Kepada Entitas
Anak (PT. Bara
Makmur
84,022,978,538 84,022,978,538 100 %
Dwitama) -
Pembelian
Batubara oleh
Entitas Anak
Pinjaman
IPO Saham DAAZ Kepada Entitas
Anak (PT. Bara
1,714,754,664 Makmur 1,714,754,664 100 %
Dwitama) -
Modal Kerja
Entitas Anak
Pinjaman
Kepada Entitas
Anak (PT. Indo
Lautan Energi) -
84,880,355,871 84,880,355,871 100 %
Pembelian
Bahan Bakar
Solar oleh
Entitas Anak
Pinjaman
Kepada Entitas
Anak (PT. Indo
857,377,332 857,377,332 100 %
Lautan Energi) -
Modal Kerja
Entitas Anak
Page 9
Details of Cost of Public Offering
Amount of
Type of Public Amount (in Percenta
Securities Code Listing Date Proceed for the Description
Offering Currency) ge
Public Offering
IPO Saham DAAZ 264,000,000,00a. Underwriting fee
0
750,000,000 0.28 %
b. Management fee
2,250,000,000 0.85 %
c. Selling fee
912,120,000 0.35 %
d. Capital Market
Supporting Profession
2,242,500,000 0.85 %
fee
e. Capital Market
Supporting Institution fee
35,000,000 0.01 %
f. Financial advisory fee
0 0 %
g. Other fees which can
be directly attributed as
571,456,500 0.22 %
securities issuance fees
Thus to be informed accordingly.
Respectfully,
PT Daaz Bara Lestari Tbk
Yulianti
Chief of Investor Relations
PT Daaz Bara Lestari Tbk
Gedung Office 8, Lantai 21 Unit E dan F, Jl. Senopati No. 8B, Senayan, Kebayoran
Phone : (021) 2933 3203, Fax : , http://www.daaz-group.com/
Sender Name Yulianti
Function Chief of Investor Relations
Date and Time 10-01-2025 17:05
Attachment 1. 250110 Lamp - Laporan Penggunaan Dana Hasil IPO.pdf
Page 10
This is an official document of PT Daaz Bara Lestari Tbk that does not require a signature as it was generated
electronically by the electronic reporting system. PT Daaz Bara Lestari Tbk is fully responsible for the information
contained within this document.
Names mentioned 5 people and organisations named in the text · linked when the evidence is strong
unresolved
org
PT. Bara Makmur
p.2 ×4
unresolved
org
PT. Indo
p.2 ×4
unresolved
person
Yulianti
· Chief of Investor Relations
p.4 ×2
Extraction attempts how the parser did, and what it refused
Nothing structured was extracted from this document — the attempts below say why.
No extraction attempted yet.