Skip to content
Back to announcement

20250110_DAAZ_Laporan Penggunaan Dana Hasil Penawaran Umum_31844909.pdf

Other Text extracted DAAZ

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 10

Page 1
Go To English Page

 Nomor Surat                              001/DIR-I/2024

 Nama Perusahaan                          PT Daaz Bara Lestari Tbk

 Kode Emiten                              DAAZ

 Lampiran                                 1

 Perihal                                  Laporan Penggunaan Dana Hasil Penawaran Umum


Dana yang diperoleh dari Penawaran Umum IDR

                                                                                 Rencana    Realisasi
                                               Jumlah
                                                             Biaya     Hasil    Penggunaa Penggunaa
                                                 Hasil
  Jenis                                                   Penawaran Realisasi     n Dana     n Dana   Sisa Dana
                               Tanggal        Penawaran
Penawaran Nama Emisi                                        Umum       Bersih    Menurut    Menurut    (satuan
                                Efektif         Umum
  Umum                                                   (satuan mata (satuan   Prospektus Prospektus mata uang)
                                               (satuan
                                                             uang)   mata uang)   (satuan    (satuan
                                              mata uang)
                                                                                mata uang) mata uang)
                               11
                                     264.000.000. 6.761.076.50 257.238.923. 257.238.923. 257.238.923.
IPO Saham            DAAZ   November                                                                      0
                                         000            0          500          500          500
                              2024

Penempatan Sisa Dana

     Jenis
                      Kode Nama
   Penawaran                                                         Penempatan List
                         Efek
     Umum



  IPO Saham             DAAZ
Page 2
Rincian Rencana Penawaran Umum

    Jenis
               Kode Nama
  Penawaran                 Tanggal Efektif                           Rencana List
                  Efek
    Umum
                                                   Hasil
                                                 Realisasi                       Jumlah
                                                  Bersih         Uraian       (satuan mata     Persentase
                                               (satuan mata                       uang)
                                                   uang)
                                                             Pembelian Bijih
                                              84.562.768.696    Nikel oleh    84.562.768.696    100     %
                                                               Perseroan
                                                               Modal Kerja
                                               1.200.688.399                   1.200.688.399    100     %
                                                               Perseroan
                                                                Pinjaman
                                                             Kepada Entitas
                                                             Anak (PT. Bara
                                                                 Makmur
                                              84.022.978.538                  84.022.978.538    100     %
                                                               Dwitama) -
                                                               Pembelian
                                                              Batubara oleh
                                                              Entitas Anak
                             11 November                        Pinjaman
  IPO Saham       DAAZ                                       Kepada Entitas
                                 2024
                                                             Anak (PT. Bara
                                               1.714.754.664     Makmur        1.714.754.664    100     %
                                                               Dwitama) -
                                                               Modal Kerja
                                                              Entitas Anak
                                                                Pinjaman
                                                             Kepada Entitas
                                                             Anak (PT. Indo
                                                             Lautan Energi) -
                                              84.880.355.871                  84.880.355.871    100     %
                                                               Pembelian
                                                              Bahan Bakar
                                                                Solar oleh
                                                              Entitas Anak
                                                                Pinjaman
                                                             Kepada Entitas
                                                             Anak (PT. Indo
                                                857.377.332                     857.377.332     100     %
                                                             Lautan Energi) -
                                                               Modal Kerja
                                                              Entitas Anak
Page 3
Rincian Realisasi Penawaran Umum

    Jenis
                Kode Nama
  Penawaran                   Tanggal Efektif                           Realisasi List
                   Efek
    Umum
                                                     Hasil
                                                   Realisasi                        Jumlah
                                                    Bersih         Uraian        (satuan mata    Persentase
                                                 (satuan mata                        uang)
                                                     uang)
                                                               Pembelian Bijih
                                                84.562.768.696    Nikel oleh    84.562.768.696    100     %
                                                                 Perseroan
                                                                 Modal Kerja
                                                 1.200.688.399                   1.200.688.399    100     %
                                                                 Perseroan
                                                                  Pinjaman
                                                               Kepada Entitas
                                                               Anak (PT. Bara
                                                                   Makmur
                                                84.022.978.538                  84.022.978.538    100     %
                                                                 Dwitama) -
                                                                 Pembelian
                                                                Batubara oleh
                                                                Entitas Anak
                               11 November                        Pinjaman
  IPO Saham        DAAZ                                        Kepada Entitas
                                   2024
                                                               Anak (PT. Bara
                                                 1.714.754.664     Makmur        1.714.754.664    100     %
                                                                 Dwitama) -
                                                                 Modal Kerja
                                                                Entitas Anak
                                                                  Pinjaman
                                                               Kepada Entitas
                                                               Anak (PT. Indo
                                                               Lautan Energi) -
                                                84.880.355.871                  84.880.355.871    100     %
                                                                 Pembelian
                                                                Bahan Bakar
                                                                  Solar oleh
                                                                Entitas Anak
                                                                  Pinjaman
                                                               Kepada Entitas
                                                               Anak (PT. Indo
                                                  857.377.332                     857.377.332     100     %
                                                               Lautan Energi) -
                                                                 Modal Kerja
                                                                Entitas Anak
Page 4
Rincian Biaya Penawaran Umum

   Jenis                                            Jumlah                                     Jumlah
                                     Tanggal                                                             Persenta
 Penawaran         Kode Efek                         Hasil                Uraian            (Satuan Mata
                                      Efektif                                                               se
   Umum                                            Penawaran                                    Uang)
 IPO Saham            DAAZ        11 November 264.000.000.00a. biaya jasa penjaminan
                                      2024          0       (underwriting fee);
                                                                                            750.000.000     0,28    %


                                                                 b. biaya jasa
                                                                 penyelenggaraan
                                                                                            2.250.000.000   0,85    %
                                                                 (management fee);

                                                                 c. biaya jasa penjualan
                                                                 (selling fee);
                                                                                            912.120.000     0,35    %


                                                                 d. biaya jasa profesi
                                                                 penunjang pasar modal;
                                                                                            2.242.500.000   0,85    %


                                                                 e. biaya jasa lembaga
                                                                 penunjang pasar modal;
                                                                                             35.000.000     0,01    %
                                                                 dan

                                                                 f. biaya jasa konsultasi
                                                                 keuangan (financial
                                                                                                 0           0      %
                                                                 advisory fee).

                                                                 g. Biaya lain-lain yang
                                                                 dapat diatribusikan
                                                                                            571.456.500     0,22    %
                                                                 langsung sebagai biaya
                                                                 emisi***)

Demikian untuk diketahui.


Hormat Kami,
PT Daaz Bara Lestari Tbk




 Yulianti

Chief of Investor Relations




PT Daaz Bara Lestari Tbk
Gedung Office 8, Lantai 21 Unit E dan F, Jl. Senopati No. 8B, Senayan, Kebayoran
Telepon : (021) 2933 3203, Fax : , http://www.daaz-group.com/



Nama Pengirim                      Yulianti

Jabatan                            Chief of Investor Relations
Tanggal dan Waktu                  10-01-2025 17:05

Lampiran                          1. 250110 Lamp - Laporan Penggunaan Dana Hasil IPO.pdf
Page 5
 Dokumen ini merupakan dokumen resmi PT Daaz Bara Lestari Tbk yang tidak memerlukan tanda tangan karena
dihasilkan secara elektronik oleh sistem pelaporan elektronik. PT Daaz Bara Lestari Tbk bertanggung jawab penuh
                                  atas informasi yang tertera didalam dokumen ini.
Page 6
Go To Indonesian Page

 Announcement Number                     001/DIR-I/2024

 Issuer Name                             PT Daaz Bara Lestari Tbk

 Issuer Code                             DAAZ

 Attachment                              1

 Subject                                 Laporan Penggunaan Dana Hasil Penawaran Umum


Fund received form the public offering            IDR


                                        Amount of                                Plan for use Realized
                                         Proceed      Cost of                     of proceed Use of Fund
   Type of                                                             Net                                  Remaining
                Name of                  from the      Public                   according to according to
    public                 Listing Date                            Realization                               Fund (in
                Issuance                   Public    Offering (in                     the          the
   offering                                                       (in Currency)                             Currency)
                                        Offering (in Currency)                   Prospectus Prospectus
                                        Currency)                               (in Currency) (in Currency)

                                             264,000,000, 6,761,076,50 257,238,923, 257,238,923, 257,238,923,
IPO Saham         DAAZ                                                                                          0
                                                 000            0          500          500          500


Allocation of Remaining Fund


 Type of public Name / Code of
                                                                        List of allocation
    offering      Securities



  IPO Saham             DAAZ
Page 7
Details of Public Offering Plan


 Type of public Name / Code of
                                  Listing date                            List of plans
    offering      Securities



                                                 Net Realization                    Amount (in
                                                                   Description                    Percentage
                                                  (in Currency)                     Currency)


                                                                Pembelian Bijih
                                                 84,562,768,696    Nikel oleh    84,562,768,696    100     %
                                                                  Perseroan
                                                                  Modal Kerja
                                                  1,200,688,399                   1,200,688,399    100     %
                                                                  Perseroan
                                                                   Pinjaman
                                                                Kepada Entitas
                                                                Anak (PT. Bara
                                                                    Makmur
                                                 84,022,978,538                  84,022,978,538    100     %
                                                                  Dwitama) -
                                                                  Pembelian
                                                                 Batubara oleh
                                                                 Entitas Anak
                                                                   Pinjaman
  IPO Saham            DAAZ                                     Kepada Entitas
                                                                Anak (PT. Bara
                                                  1,714,754,664     Makmur        1,714,754,664    100     %
                                                                  Dwitama) -
                                                                  Modal Kerja
                                                                 Entitas Anak
                                                                   Pinjaman
                                                                Kepada Entitas
                                                                Anak (PT. Indo
                                                                Lautan Energi) -
                                                 84,880,355,871                  84,880,355,871    100     %
                                                                  Pembelian
                                                                 Bahan Bakar
                                                                   Solar oleh
                                                                 Entitas Anak
                                                                   Pinjaman
                                                                Kepada Entitas
                                                                Anak (PT. Indo
                                                   857,377,332                     857,377,332     100     %
                                                                Lautan Energi) -
                                                                  Modal Kerja
                                                                 Entitas Anak
Page 8
Details of Public Offering Realization


 Type of Public Name / Code of
                                     Listing Date                          Realization Plan
    Offering      Securities



                                                    Net Realization                   Amount (in
                                                                      Description                    Percentage
                                                     (in Currency)                    Currency)


                                                                   Pembelian Bijih
                                                    84,562,768,696    Nikel oleh    84,562,768,696    100     %
                                                                     Perseroan
                                                                     Modal Kerja
                                                     1,200,688,399                   1,200,688,399    100     %
                                                                     Perseroan
                                                                      Pinjaman
                                                                   Kepada Entitas
                                                                   Anak (PT. Bara
                                                                       Makmur
                                                    84,022,978,538                  84,022,978,538    100     %
                                                                     Dwitama) -
                                                                     Pembelian
                                                                    Batubara oleh
                                                                    Entitas Anak
                                                                      Pinjaman
  IPO Saham            DAAZ                                        Kepada Entitas
                                                                   Anak (PT. Bara
                                                     1,714,754,664     Makmur        1,714,754,664    100     %
                                                                     Dwitama) -
                                                                     Modal Kerja
                                                                    Entitas Anak
                                                                      Pinjaman
                                                                   Kepada Entitas
                                                                   Anak (PT. Indo
                                                                   Lautan Energi) -
                                                    84,880,355,871                  84,880,355,871    100     %
                                                                     Pembelian
                                                                    Bahan Bakar
                                                                      Solar oleh
                                                                    Entitas Anak
                                                                      Pinjaman
                                                                   Kepada Entitas
                                                                   Anak (PT. Indo
                                                      857,377,332                     857,377,332     100     %
                                                                   Lautan Energi) -
                                                                     Modal Kerja
                                                                    Entitas Anak
Page 9
Details of Cost of Public Offering

                                                       Amount of
Type of Public                                                                                   Amount (in   Percenta
                  Securities Code     Listing Date   Proceed for the     Description
   Offering                                                                                      Currency)       ge
                                                     Public Offering
  IPO Saham            DAAZ                          264,000,000,00a. Underwriting fee
                                                            0
                                                                                                750,000,000 0.28         %


                                                                   b. Management fee
                                                                                                2,250,000,000 0.85       %


                                                                   c. Selling fee
                                                                                                912,120,000 0.35         %


                                                                   d. Capital Market
                                                                   Supporting Profession
                                                                                                2,242,500,000 0.85       %
                                                                   fee

                                                                   e. Capital Market
                                                                   Supporting Institution fee
                                                                                                 35,000,000 0.01         %


                                                                   f. Financial advisory fee
                                                                                                      0       0          %


                                                                   g. Other fees which can
                                                                   be directly attributed as
                                                                                                571,456,500 0.22         %
                                                                   securities issuance fees


Thus to be informed accordingly.


 Respectfully,
 PT Daaz Bara Lestari Tbk




  Yulianti

 Chief of Investor Relations




 PT Daaz Bara Lestari Tbk
 Gedung Office 8, Lantai 21 Unit E dan F, Jl. Senopati No. 8B, Senayan, Kebayoran
 Phone : (021) 2933 3203, Fax : , http://www.daaz-group.com/



 Sender Name                          Yulianti

 Function                            Chief of Investor Relations

 Date and Time                       10-01-2025 17:05

 Attachment                          1. 250110 Lamp - Laporan Penggunaan Dana Hasil IPO.pdf
Page 10
 This is an official document of PT Daaz Bara Lestari Tbk that does not require a signature as it was generated
electronically by the electronic reporting system. PT Daaz Bara Lestari Tbk is fully responsible for the information
                                           contained within this document.

File

File Open PDF
Source IDX
Size0.02 MB
Published10 Jan 2025
Pages10
Characters25,911
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 5 people and organisations named in the text · linked when the evidence is strong

linked org Daaz Bara Lestari Tbk · Nama Perusahaan p.1 ×30
linked org PT. Indo Lautan Energi p.2 ×7
unresolved org PT. Bara Makmur p.2 ×4
unresolved org PT. Indo p.2 ×4
unresolved person Yulianti · Chief of Investor Relations p.4 ×2

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result