Skip to content
Back to announcement

20250110_GEMS_Laporan Bulanan Aktivitas Eksplorasi_31844858_lamp1.pdf

Other Text extracted GEMS

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 8

Page 1
No. 006/GEMS-CS/I/2025                                                                      Jakarta, 10 Januari/January 2025

Kepada Yth.:
Direksi PT Bursa Efek Indonesia
Gedung Bursa Efek Indonesia Tower I
Jln. Jend. Sudirman Kav 52-53
Jakarta 10190

U.p. : : Ibu Vera Florida (Kepala Divisi Penilaian Perusahaan 2) /
       (Head of Corporate Valuation Division 2)

Perihal : Laporan Aktivitas Eksplorasi periode Q4 2024              Subject : Exploration Activity Q4 2024 Report

Dengan hormat,                                                      Sincerely,

Sehubungan dengan Peraturan PT Bursa Efek Indonesia                 In accordance to Indonesia Stock Exchange Regulation
Nomor I-E tanggal 31 Desember 2022 tentang Kewajiban                No. I-E dated 31 December 2022 concerning
Penyampaian Informasi, maka dengan ini kami                         Information Submission Obligation, we hereby submit
sampaikan Laporan Aktivitas Eksplorasi Pertambangan                 the Exploration Activity for the period of Q4 2024 of the
periode Q4 2024 di lingkungan anak-anak Perusahaan                  Company’s subsidiaries as attached.
PT Golden Energy Mines Tbk (“Perseroan”) sebagaimana
terlampir.

Dalam      hal     terdapat  perbedaan penafsiran                   In the event there is any difference of
informasi yang diumumkan dalam Bahasa Inggris dan                   interpreting the information notified in English
Bahasa Indonesia, maka informasi yang digunakan                     language and Indonesian language, the Indonesian
sebagai acuan adalah informasi dalam Bahasa                         language shall prevail.
Indonesia.

Demikian kami sampaikan. Atas perhatiannya kami Thank you for your attention and co-operation.
ucapkan terima kasih.

Hormat kami/Sincerely yours,
PT Golden Energy Mines Tbk




Sudin, SH
Corporate Secretary



Tembusan/Copies :
   - Direksi Perseroan/Board of Directors of the Company.
                                        PT. Golden Energy Mines Tbk.
               Sinar Mas Land Plaza Tower II, 6th Floor Jl. MH. Thamrin No. 51 Kav. 22, Jakarta Pusat 10350
                                   Phone: (62) 21 50186 888 , Fax: (62) 21 3199 0319
                                        Website: www.goldenenergymines.com
Page 2
1. PT Kuansing Inti Makmur (“KIM”) dan anak perusahaan
   (KIM Blok) / and its subsidiaries (KIM Block)
   1.1. Daerah Eksplorasi                                 1.1. Exploration Activity
        Kegiatan pengeboran periode Q4 2024 dilakukan di       Drilling activities for the Q4 2024 period were
        konsesi IUP PT Bungo Bara Makmur (BBM), PT             carried out in the IUP concession of PT Bungo
        Bungo Bara Utama (BBU) dan KIM, terletak di Dusun      Bara Makmur (BBM), PT Bungo Bara Utama
        Tanjung Belit, Kecamatan Jujuhan, Kabupaten            (BBU) and KIM, located in Tanjung Belit
        Bungo, Provinsi Jambi.                                 Village, Jujuhan District, Bungo Regency, Jambi
                                                               Province.

   1.2. Metode Pengeboran                                  1.2. Drilling Methods
        Kegiatan pengeboran menggunakan 1 Unit Rig Jacro       Drilling activities use 1 Jacro 300 Triple Tube
        300 Triple Tube dengan Pipa ukuran HQ dengan           Rig Unit with HQ size pipe using the Touch
        metode pengeboran Touch Coring.                        Coring drilling method.
        Kegiatan pergerakan rig di support oleh alat berat     Rig movement activities are supported by
        excavator. Sebelum melakukan pemindahan rig,           heavy excavator equipment. Before moving
        wellsite bertugas untuk mencari dan menentukan         the rig, the wellsite shall find and determine
        titik bor, serta menentukan lokasi yang aman untuk     the drill point, as well as determining a safe
        dilakukan pengeboran.                                  location for drilling.
        Pengeboran dilakukan dengan bantuan air dan            Drilling is carried out with the help of water
        menggunakan 3 sanchin, untuk mengalirkan air           and uses 3 sanchins, to drain the water.
        Sanchin 45 digunakan untuk mengalirkan air pada        Sanchin 45 was used to drain water in the
        kolam suplai menuju rig, sedangkan sanchin 120         supply pool to the rig, while sanchin 120 was
        digunakan saat proses pengeboran. Air sangat           used during the drilling process. Water is very
        diperlukan dalam kegiatan pengeboran, seperti: air     necessary in drilling activities, such as: water
        berperan sebagai pendingin mesin, air digunakan        acts as a machine coolant, water is used to
        untuk mendinginkan mata bor dan membantu               cool the drill bit and help extract cores, and
        pengambilan core, serta air juga dapat digunakan       water can also be used to remove cores from
        untuk mengeluarkan core dari dalam inner.              the inner core.

   1.3. Pelaksanaan dan Pengawasan Kegiatan Eksplorasi       1.3. Exploration Activities Progress & Supervision
        Aktivitas pengeboran periode Q4 2024 memiliki             Drilling activities for the Q4 2024 period have a
        total    kedalaman        957,25   meter.       Pada      total depth of 957.25 meters. In practice, 1
        pelaksanaannya memakai 1 rig Jacro300 untuk               Jacro300 rig was used to speed up drilling
        mempercepat produktivitas bor. Total hole yang            productivity. The total number of holes drilled
        dilakukan pengeboran berjumlah 10 titik bor dimana        was 10 drill points, of which there was 1 redrill
        ada 1 titik bor redrill dimana berada di Blok BBM         drill point, of which there were 7 drill points in
        sebanyak 7 titik bor, Blok BBU sebanyak 2 titik, dan      the BBM Block, 2 drill points in the BBU Block,
        Blok KIM sebanyak 1 titik.                                and 1 drill point in the KIM Block.




                                            PT. Golden Energy Mines Tbk.
                   Sinar Mas Land Plaza Tower II, 6th Floor Jl. MH. Thamrin No. 51 Kav. 22, Jakarta Pusat 10350
                                       Phone: (62) 21 50186 888 , Fax: (62) 21 3199 0319
                                            Website: www.goldenenergymines.com
Page 3
   Kegiatan pengeboran lapangan dilakukan oleh tim                        Field drilling activities were carried out by a
   ahli dari PT Nusantara Drilling Services (NDS).                        team of experts from PT Nusantara Drilling
   Pengolahan data dilakukan dibantu oleh tim Head                        Services (NDS). Data processing was carried
   Office (HO) KIM Jakarta dari analisa, ekstraksi, dan                   out with assistance from the KIM Jakarta Head
   menampilkan output project secara keseluruhan.                         Office (HO) team, analyzing, extracting and
                                                                          displaying the overall project output.

1.4. Kemajuan Eksplorasi                              1.4. Exploration Progress
     Kegiatan pengeboran eksplorasi selama periode Q4 Drilling exploration for the period of Q4 2024 are
     2024 adalah sebagai berikut :                    as follows :

                  Tabel 1.1. Kemajuan Pengeboran Eksplorasi KIM Block periode Q4 2024
                   Progress of Exploration Drilling of KIM Block for the Period of Q4 2024


                               Lubang Eksplorasi (m) /
                               Exploration Drilling
     Lokasi                                                          Total kedalaman (m) /
     Location                  Jumlah lubang /                       Total Depth
                               Total Holes
                                                                     Drilling                 Logging

     Blok BBM                                 7                            609,30                   598,70
     Blok BBU                                 2                            315,05                   313,56
     Blok KIM                                 1                             32,90                    32,18




1.5. Biaya Eksplorasi                               1.5. Drilling Cost
     Biaya eksplorasi selama periode Q4 2024 adalah      The exploration costs for the period of Q4
     sebagai berikut :                                   2024 are as follows :

                                                                        Year to Date
                Operating Expense
                                               Anggaran / Plan (Rp)           Realisasi / Realisation (Rp)
         Biaya Pengeboran /                    Rp. 1.021.620.000,-           Rp. 1.021.620.000,-
         Drilling Cost




                                         PT. Golden Energy Mines Tbk.
                Sinar Mas Land Plaza Tower II, 6th Floor Jl. MH. Thamrin No. 51 Kav. 22, Jakarta Pusat 10350
                                    Phone: (62) 21 50186 888 , Fax: (62) 21 3199 0319
                                         Website: www.goldenenergymines.com
Page 4
2. PT Borneo Indobara (“BIB”)
   2.1. Daerah Eksplorasi                                  2.1. Exploration Activity
        Kegiatan pengeboran eksplorasi meliputi 3 kegiatan      Exploration drilling activities include 3 main
        utama, yaitu pengeboran eksplorasi preproduksi,         activities, namely preproduction exploration
        pengeboran eksplorasi pengembangan, dan                 drilling, development exploration drilling, and
        pengeboran geoteknik.                                   geotechnical drilling.
        Kegiatan pengeboran preproduksi dilakukan untuk         Preproduction drilling activities are carried
        melengkapi data pemodelan geologi dan kualitas          out to complement geological modeling data
        batubara pada masing-masing area. Pengeboran            and coal quality in each area. Development
        eksplorasi     pengembangan       bertujuan untuk       exploration drilling aims to obtain lithology
        mendapatkan data litologi dan kualitas batubara         and coal quality data for geological modeling
        untuk pembuatan model geologi serta mendukung           and to support the addition of new coal
        penambahan sumberdaya batubara baru pada area           resources in areas where exploration has
        yang belum pernah dilakukan kegiatan eksplorasi.        never been carried out. Geotechnical drilling
        Kegiatan pengeboran geoteknik dilakukan untuk           activities are carried out to determine the
        mengetahui daya dukung tanah dan sifat fisik            carrying capacity of the soil and the physical
        batuan pada area pit penambangan dan disposal           properties of the rock in the mining area and
        serta di area project perusahaan.                       disposal area in the company.

       Kegiatan pengeboran periode Q4 2024 dilakukan                         Drilling activities in Q4 2024 were carried out
       pengeboran eksplorasi preproduksi dan pengeboran                      by      preproduction       exploration     and
       geoteknik di area Girimulya Utara.                                    geotechnical drilling drilling in North
                                                                             Girimulya.

  2.2. Metode Pengeboran                                   2.2. Drilling Methods
       Pada periode Q4 2024, pengeboran eksplorasi              For the period of Q4 2024, preproduction
       preproduksi dilakukan dengan metode open hole            exploration drilling was carried out using
       dan part coring, sedangkan pengeboran geoteknik          open holes and part coring, while
       dilakukan dengan menggunakan metode SPT, coring          geotechnical drilling was carried out using
       dan open hole. Kegiatan geofisika logging dilakukan      SPT, coring and open hole methods.
       di seluruh lubang bor yang telah selesai dilakukan       Geophysical logging activities are carried out
       untuk memastikan kedalaman top dan bottom                in all drilled holes that have been completed
       batubara sehingga ketebalan batubara dapat               to ensure the depth of the top and bottom of
       diketahui lebih akurat dan untuk mengetahui varian       the coal so that the thickness of the coal can
       dan karakteristik batuan non batubara berdasarkan        be known more accurately and to determine
       perekaman gelombang gamma ray dan density.               the characteristics of non-coal rock based on
                                                                recording gamma ray waves and density.




                                           PT. Golden Energy Mines Tbk.
                  Sinar Mas Land Plaza Tower II, 6th Floor Jl. MH. Thamrin No. 51 Kav. 22, Jakarta Pusat 10350
                                      Phone: (62) 21 50186 888 , Fax: (62) 21 3199 0319
                                           Website: www.goldenenergymines.com
Page 5
   2.3. Pelaksanaan dan Pengawasan Kegiatan Eksplorasi           2.3. Exploration Activities Progress & Supervision
        Kegiatan pengeboran eksplorasi dan geoteknik                  Exploration and geotechnical drilling activities
        dilakukan oleh Departemen Survey, Geotech &                   carried out by the Survey, Geotech &
        Exploration (SGE) BIB.                                        Exploration (SGE) Department of BIB.
        Untuk mendukung kegiatan pengeboran eksplorasi                To support the preproduction exploration
        preproduksi dan eksplorasi pengembangan berupa                drilling and development exploration
        pengeboran open hole dan coring digunakan 2 unit              activities such as open hole and coring
        rig inhouse 1 unit tipe Jacro 175 dan 1 unit rig tipe         geotechnical drilling, 2 units type of inhouse
        Jacro 500. Untuk pengeboran geoteknik dengan                  rig were used, 1 unit Jacro 175 and 1 unit
        metode SPT digunakan 1 unit rig tipe Jacro 200.               Jacro 500. The geotechnical drilling with SPT
        Seluruh unit rig dioperasikan oleh drilling operator          method was used 1 unit rig of Jacro 200. All
        BIB. Kontraktor pengeboran PT ICE mengoperasikan              rig units were operated by BIB drilling
        4 unit rig tipe Jacro 300 dan 1 unit rig tipe Jacro 200.      operator. Drilling contractor PT ICE operated
        Kegiatan geofisika logging dilakukan oleh PT Surtech          4 units rig of Jacro 300 and 1 unit rig of Jacro
        Indonesia yang mengoperasikan 2 unit alat logging.            200. Geophysical logging activities were
                                                                      carried out by PT Surtech Indonesia, which
                                                                      operated 2 units of Geophysical logging.
        Seluruh kegiatan pengeboran disupervisi langsung              All drilling activities are directly supervised by
        oleh Wellsite Geologist, Departemen SGE dan                   the Wellsite Geologist, SGE Department and
        Evaluator Geologist Departemen Strategic, Plan &              Geologist Evaluator, Strategic, Plan &
        Optimization (SPO), seluruhnya dibawah Divisi Mine            Optimization (SPO) Department, all under the
        Development & Contract Management (MDC) BIB.                  Mine Development & Contract Management
                                                                      (MDC) Division of BIB.

   2.4. Kemajuan Eksplorasi                              2.4. Exploration Progress
        Kegiatan pengeboran eksplorasi selama periode Q4      Drilling exploration for the period of Q4 2024
        2024 adalah sebagai berikut :                         are as follows :

                    Tabel 1.1. Kemajuan Pengeboran Ekplorasi dan Geoteknik periode Q4 2024/
                        Progress in Exploration and Geotechnical Drilling Period of Q4 2024
                     Lubang Geoteknik (m) /                              Lubang Eksplorasi (m) /
                     Geotech Drilling                                    Exploration Drilling

Lokasi               Jumlah       Total kedalaman (m) /                  Jumlah       Total kedalaman (m) /
Location             lubang       Total Depth                            lubang       Total Depth
                     /                                                   /
                     Total        Drilling           Logging             Total        Drilling                Logging
                     Holes                                               Holes
Girimulya Utara          6            117,50             109,00            59             9.512,60                 8.698,40




                                             PT. Golden Energy Mines Tbk.
                    Sinar Mas Land Plaza Tower II, 6th Floor Jl. MH. Thamrin No. 51 Kav. 22, Jakarta Pusat 10350
                                        Phone: (62) 21 50186 888 , Fax: (62) 21 3199 0319
                                             Website: www.goldenenergymines.com
Page 6
  2.5. Biaya Eksplorasi                              2.5. Drilling Cost
       Untuk biaya eksplorasi selama periode Q4 2024      The exploration costs for the period of Q4
       adalah sebagai berikut :                           2024 are as follows :

               Tabel 1.2. Biaya Pengeboran Eksplorasi dan Geoteknik RIG Inhouse periode Q4 2024 /
                        Exploration and Geotechnial Drilling Cost for the period of Q4 2024

                                                                          Year to Date
                  Operating Expense
                                                 Anggaran / Plan (Rp)           Realisasi / Realisation (Rp)
             Biaya Pengeboran /                  Rp. 14.219.770.735,-          Rp. 11.119.868.383,-
             Drilling Cost


3. PT Trisula Kencana Sakti (TKS)
   Tidak ada kegiatan eksplorasi di area TKS pada periode There is no exploration activity in the mine area
   Q4 2024.                                               TKS for the period of Q4 2024.

4. PT Berkat Satria Abadi (BSA) dan PT Wahana Rimba
   Lestari (WRL)
   Tidak ada kegiatan eksplorasi di area BSA dan WRL pada There is no exploration activity in the mine area
   periode Q4 2024.                                       BSA and WRL for the period of Q4 2024.

5. PT Barasentosa Lestari (BSL)
   5.1. Daerah Eksplorasi                                                5.1. Daerah Eksplorasi
        Kegiatan pengeboran eksplorasi BSL periode Q4                       Drilling activities of BSL in Q4 2024 was
        2024 dilakukan di area Blok Belani pada High Wall.                  conducted in the Belani Block area within
        Tipe pengeboran meliputi pengeboran open hole                       High Wall areas. The drilling types included
        dan coring untuk pengeboran SPT di daerah                           open hole and full coring for drilling in the pit
        disposal dan full coring untuk mendapatkan sample                   Belani (Acid rock drainage sample). The
        ARD (acid rock drainage). Pengeboran pada Q4                        drilling in Q4 2024 did not include geophysical
        2024 tidak dilengkapi dengan pengukuran geofisika                   logging measurements.
        logging.

  5.2. Metode Pengeboran                                                 5.2. Drilling Method
       Pelaksanaan pengeboran pada blok Belani                              Drilling activities at Belani Block is carried out
       dilaksanakan dengan memakai sistem grid, dengan                      using a grid system, with 50-100 meter
       jarak antara cross line 50-100 m dan jarak antar                     distance of cross line and 10-75 meter drill
       lubang bor 10-75 m, mengikuti jurus dan                              hole spacing, follow the strike and dip of coal
       kemiringan (down dip) pelapisan batuan hingga                        seam with maximum Depth around 60-90
       kedalaman maksimal 60-90 meter. Hal ini bertujuan                    meter. The purpose of grid system and
       untuk memaksimalkan stripping ratio (SR) dan                         control maximum Dept for determine of
       kemenerusan batubara. Rapatnya radius antar titik                    optimization stripping ratio (SR) and
       bor    disebabkan     adanya    indikasi  tingkat                    continuity of coal. The drill hole spacing is

                                           PT. Golden Energy Mines Tbk.
                  Sinar Mas Land Plaza Tower II, 6th Floor Jl. MH. Thamrin No. 51 Kav. 22, Jakarta Pusat 10350
                                      Phone: (62) 21 50186 888 , Fax: (62) 21 3199 0319
                                           Website: www.goldenenergymines.com
Page 7
    kompleksitas geologi yang tinggi pada area                           relatively close, because drilling area have
    pengeboran khususnya adanya struktur geologi                         high complexity geological condition, such as
    patahan dengan offset (throw) lebih besar dari 20                    structure geology fault with throw more than
    meter, bidang perlapisan (dip) yang berubah terjah                   20 meter. Beside that there are changed dip
    dari 26° menjadi 88° dan jurus perlapisan (strike)                   of coal seam from 26° to be 88°, strike of coal
    dari N 256 E menjadi N 135 E dan terdapat pola                       seam from N 256 E to be N 135 E and fold
    lipatan pada lapisan batuan yang telah terbuka                       major presence at exposed of mining area.
    (exposed).
    Pengeboran yang dilakukan yaitu tipe lubang                          Drilling was conducted with open hole and
    terbuka (open hole) dan part coring. Unit bor yang                   part coring type. The drill unit used are rigs
    digunakan adalah rig tipe Jacro-200 dengan                           type Jacro-200 with 4 inch (diameter 96 mm)
    diameter lubang bor (outside) HQ 4 inch (Ǿ 96 mm).                   drill holes (outside) HQ.

    Pengambilan contoh sample batubara bertujuan                         The purpose of sampling of coal is to analyze
    untuk dilakukan analisa kualitas batubara.                           the quality of the coal.

5.3. Pelaksanaan dan Pengawasan Kegiatan Eksplorasi                      5.3. Implementation and Supervision of
                                                                              Exploration Activities
    Kegiatan pengeboran BSL periode Q4 2024 pada                         Drilling activities of BSL fot the period of Q4
    blok Belani dilakukan oleh tim eksplorasi dengan 1                   2024 at Block Belani were carried out by the
    unit rig di bawah supervisi Geologist Section                        drilling team with 1 rig under the supervision
    Geology dan Geotech, Departemen Mine Planing &                       of the Geologist Section Geology and
    Technical Service BSL.                                               Geotech, BSL's Mine Planning & Technical
                                                                         Service Department.
    Kegiatan pengeboran Q4 2024 dilakukan satu shift                     Drilling activities on Q4 2024 was conducted
    yaitu pagi dengan target kedalaman maksimal                          one shifts (day shift) with maximum depth
    meteran per lubang bor sebesar 90 meter, tentunya                    target per hole is 90 meter and with standard
    dengan memenuhi standar safety seperti adanya                        safety such as good lighting and other
    penerangan yang cukup dan kelengkapan standar                        equipment to support operational drilling
    lainnya.                                                             activity.

    Unit Rig yang digunakan pada kegiatan pengeboran                     Drilling activity used 1 units of Jacro-200. Spec
    adalah tipe jacro-200, dengan spesifikasi diameter                   of rods pipe is 4 inch (96 mm) diameter drill
    lubang bor (outside) HQ 4 inch (Ǿ 96 mm). Selain                     holes (outside) HQ Rods type. Other than
    unit Rig Jacro juga terdapat unit SPT dengan palu.                   Jacro Rig unit, there is also an SPT unit with a
                                                                         hammer.
    Unit rig jacro-200 ini merupakan unit dengan                         Rig Jacro-200 is unit rig medium specification
    spesifikasi menengah dengan target kedalaman                         with the ability of maximum depth coring 90
    pengeboran coring hingga 90 meter dan ukuran                         meters and have a big size unit so needs
    yang cukup besar sehingga diperlukan unit alat                       heavy equipment unit like (excavator or
    berat (excavator atau Bulldozer) untuk melakukan                     Bulldozer) for moving to others drill point.
    perpindahan unit dari titik bor satu ke titik bor
    lainnya.


                                       PT. Golden Energy Mines Tbk.
              Sinar Mas Land Plaza Tower II, 6th Floor Jl. MH. Thamrin No. 51 Kav. 22, Jakarta Pusat 10350
                                  Phone: (62) 21 50186 888 , Fax: (62) 21 3199 0319
                                       Website: www.goldenenergymines.com
Page 8
    Lubang bor yang telah selesai dilakukan                                 Drill holes that have been finished then
    pengeboran kemudian dilakukan pickup collar                             carried out by a pickup collar survey by the
    survey oleh tim survey BSL yang terdiri dari 1                          BSL survey team consisting of 1 surveyor
    koordinator surveyor dan 2 crew survey.                                 coordinator and 2 survey crews.

5.4. Kemajuan Eksplorasi                                                    5.4. Drilling Progress
     Selama periode Q4 2024 kegiatan pengeboran                             in Q4 2024 exploration drilling activities in
     eksplorasi di Blok Belani telah menyelesaikan 3                        Belani Block have completed 3 drill holes.
     lubang bor. Total kedalaman lubang bor selama                          Total drill hole Depth in Q4 2024 were 190.65
     periode Q4 2024 adalah 190,65 meter rincian pada                       meters as detailed in table 1.3.
     tabel 1.3.
     Pengeboran dilakukan dengan tipe pengeboran full                       Drilling type was conducted using full coring
     coring     dengan tujuan mendapatkan sample                            method with the aim of obtaining coal
     batubara dan sample contoh batuan untuk                                samples and rock core samples for mine acid
     dilakukan uji air asam tambang atau analisa                            water testing or quality analysis. Additionally,
     kualitas. Serta pengeboran SPT dilakukan untuk                         Standard Penetration Test (SPT) SPT drilling
     mendapatkan nilai propertis batuan.                                    was carried out to determine the rock
                                                                            properties values.

                        Tabel 1.3 Kemajuan Pengeboran Ekplorasi BSL Periode Q4 2024 /
                         BSL Drilling Exploration Progress for the period of Q4 2024

                                                             Lubang Eksplorasi (m) /
                                                               Exploration Drilling

    Lokasi /        Jumlah                               Total kedalaman (m) /
    Location        lubang /                             Total Depth
                                                                                                      Total (m)
                    Total                                Coring               Full Coring
                    Holes           Open Holes
                                                         (Infill)             (Geotech)
Belani              3              3,25                  -                    187,40                  190,65


5.5. Biaya Eksplorasi                              5.5. Exploration Cost
     Untuk biaya eksplorasi selama periode Q4 2024      The exploration costs for the period of Q4
     adalah sebagai berikut :                           2024 are as follows :

                            Tabel 1.4. Biaya Pengeboran Eksplorasi BSL periode Q4 2024 /
                                      BSL Drilling Cost for the period of Q4 2024

                                                                                Year to Date
               Operating Expense
                                                     Anggaran / Plan (Rp)              Realisasi / Realisation (Rp)
  Biaya Pengeboran BSL / Drilling Cost BSL          Rp. 726.522.130,-              Rp. 721.952.086,-


                                          PT. Golden Energy Mines Tbk.
                 Sinar Mas Land Plaza Tower II, 6th Floor Jl. MH. Thamrin No. 51 Kav. 22, Jakarta Pusat 10350
                                     Phone: (62) 21 50186 888 , Fax: (62) 21 3199 0319
                                          Website: www.goldenenergymines.com

File

File Open PDF
Source IDX
Size0.89 MB
Published10 Jan 2025
Pages8
Characters29,728
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 25 people and organisations named in the text · linked when the evidence is strong

linked org Golden Energy Mines Tbk p.1 ×29
linked org Sinar Mas p.1 ×8
linked org PT Borneo Indobara p.4
possible org PT Bursa Efek Indonesia p.1 ×3
unresolved person Vera Florida p.1
unresolved org Indonesia Stock Exchange p.1
unresolved org PT Golden Energy Mines Tbk Sudin p.1
unresolved person Sudin, SH · Corporate Secretary p.1
unresolved org PT Kuansing Inti Makmur p.2
unresolved org PT Bungo Bara Makmur p.2
unresolved org PT Bungo Bungo Bara Utama p.2
unresolved org PT Bungo Bara Utama Tanjung Belit p.2
unresolved org PT Nusantara Drilling Services p.3
unresolved org PT Nusantara Drilling Pengolahan p.3
unresolved org Departemen Survey p.5
unresolved org PT ICE p.5 ×2
unresolved org PT Surtech p.5
unresolved org PT Surtech Indonesia p.5
unresolved org Departemen SGE p.5
unresolved org Departemen Strategic p.5
unresolved org PT Trisula Kencana Sakti p.6
unresolved org PT Berkat Satria Abadi p.6
unresolved org PT Wahana Rimba Lestari p.6
unresolved org PT Barasentosa Lestari p.6
unresolved org Departemen Mine Planing p.7

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

Other files in this announcement 1

↑↓ select ↵ open ⇧↵ see every result