Skip to content
Back to announcement

20241220_PGEO_Laporan Informasi dan Fakta Material_31830510.pdf

Other Text extracted PGEO

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 6

Page 1
Go To English Page

 Nomor Surat                           678/PGE500/2024-S0

 Nama Perusahaan                       PT Pertamina Geothermal Energy Tbk

 Kode Emiten                           PGEO

 Lampiran                              0
                                       PT Pertamina Geothermal Energy Tbk (PGE) Mulai Langkah Strategis dengan
 Perihal
                                       Kick-Off Eksplorasi Ulubelu Extension 1 di Gunung Tiga, Kabupaten
                                       Tanggamus


Dengan ini kami untuk dan atas nama perusahaan menyampaikan Laporan Informasi atau Fakta Material sebagai
berikut:

 Nama Emiten atau Perusahaan Publik            PT Pertamina Geothermal Energy Tbk

 Bidang Usaha                                  Menyelenggarakan usaha bidang panas bumi dari hulu/hilir



 Telepon                                       +62 21 3983 3222

 Faksimili                                     +62 21 3983 3230

 Alamat Surat Elektronik (email)               datapge@pertamina.com


 Tanggal Kejadian                              20 Desember 2024
 Jenis Informasi atau Fakta Material           PT Pertamina Geothermal Energy Tbk (PGE) Mulai Langkah
                                               Strategis dengan Kick-Off Eksplorasi Ulubelu Extension 1 di
                                               Gunung Tiga, Kabupaten Tanggamus
Page 2
Uraian Informasi atau Fakta Material    PT Pertamina Geothermal Energy Tbk (PGE) (IDX: PGEO)
                                        dengan bangga mengumumkan dimulainya proyek eksplorasi
                                        di wilayah Gunung Tiga melalui kick-off yang dilaksanakan di
                                        rencana lokasi wellpad sumur eksplorasi yang terletak di Desa
                                        Gunung Tiga, Kecamatan Ulubelu, Kabupaten Tanggamus,
                                        Provinsi Lampung (17/12). Eksplorasi ini bertujuan untuk
                                        membuktikan potensi cadangan energi panas bumi sebesar 55
                                        Megawatt (MW) yang diharapkan dapat menjadi sumber baru
                                        energi bersih yang akan mendukung ketahanan energi
                                        nasional serta target transisi energi menuju net zero emission
                                        pada tahun 2060.

                                        Direktur Eksplorasi dan Pengembangan PGE Edwil Suzandi
                                        menyampaikan bahwa kick-off proyek pengembangan Wilayah
                                        Kerja Panas Bumi Gunung Tiga ini merupakan tonggak
                                        penting dalam upaya mengembangkan energi panas bumi di
                                        Indonesia. Kami optimistis bahwa eksplorasi ini akan
                                        membuktikan cadangan sekitar 55 MW, yang tidak hanya
                                        menambah kapasitas energi terbarukan, tetapi juga menjadi
                                        bentuk komitmen kami untuk menghidupkan ekosistem,
                                        memberdayakan masyarakat, dan mendorong roda
                                        perekonomian di wilayah Lampung dan Sumatra. Bersama,
                                        melalui sinergi dan kolaborasi, kita tidak hanya mewujudkan
                                        energi hijau untuk bangsa, tetapi juga menciptakan warisan
                                        berharga bagi generasi mendatang, ujar Edwil Suzandi.

                                        Gunung Tiga dipilih sebagai salah satu lokasi strategi proyek
                                        eksplorasi PGE yang dimulai pada tahun 2024 ini karena
                                        karakteristik panas bumi serta potensinya yang menjanjikan.
                                        Project Manager Proyek Eksplorasi Ulubelu Extension 1
                                        (Gunung Tiga) Sapto Trianggo menambahkan bahwa, Proyek
                                        eksplorasi ini mencakup pelaksanaan tiga sumur eksplorasi
                                        yang akan dilakukan secara bertahap sesuai dengan standar
                                        keselamatan dan lingkungan yang berlaku, ujar Sapto.

                                        Proyek ini juga melibatkan kolaborasi erat dengan masyarakat
                                        setempat untuk memastikan manfaat ekonomi, sosial, dan
                                        lingkungan yang berkelanjutan. Sebagai bagian dari komitmen
                                        terhadap keberlanjutan, proyek ini akan dijalankan dengan
                                        memprioritaskan aspek perlindungan lingkungan dan
                                        pengelolaan risiko. Hal ini sejalan dengan dukungan
                                        masyarakat sekitar area eksplorasi, khususnya Desa Gunung
                                        Tiga, yang antusias menyambut keberadaan proyek ini. Studi
                                        dampak lingkungan (AMDAL) telah dilakukan sebelumnya,
                                        dan semua kegiatan eksplorasi akan diawasi ketat untuk
                                        meminimalkan dampak negatif terhadap ekosistem sekitar.

                                        Proyek eksplorasi ini merupakan salah satu langkah strategis
                                        PGE untuk mendukung target swasembada energi Indonesia
                                        serta membuka peluang baru dalam pengembangan energi
                                        panas bumi sekaligus menciptakan lapangan kerja bagi
                                        masyarakat lokal, mendorong pertumbuhan ekonomi wilayah,
                                        dan mempercepat transisi Indonesia menuju masa depan
                                        energi yang lebih hijau dan berkelanjutan.
Dampak kejadian, informasi atau fakta
material tersebut terhadap kegiatan
operasional, hukum, kondisi keuangan,
atau kelangsungan usaha Emiten atau
Perusahaan Publik



Demikian untuk diketahui.
Page 3
Hormat Kami,
PT Pertamina Geothermal Energy Tbk




Kitty Andhora

Corporate Secretary




PT Pertamina Geothermal Energy Tbk
Grha Pertamina - Tower Pertamax Lt.7
Telepon : +62 21 3983 3222, Fax : +62 21 3983 3230, https://www.pge.pertamina.



Nama Pengirim                     Kitty Andhora

Jabatan                           Corporate Secretary
Tanggal dan Waktu                 20-12-2024 17:51




   Dokumen ini merupakan dokumen resmi PT Pertamina Geothermal Energy Tbk yang tidak memerlukan tanda
tangan karena dihasilkan secara elektronik oleh sistem pelaporan elektronik. PT Pertamina Geothermal Energy Tbk
                   bertanggung jawab penuh atas informasi yang tertera didalam dokumen ini.
Page 4
Go To Indonesian Page

 Letter / Announcement No.           678/PGE500/2024-S0

 Issuer Name                         PT Pertamina Geothermal Energy Tbk

 Issuer Code                         PGEO

 Attachment                          0

 Subject                             PT Pertamina Geothermal Energy Tbk (PGE) Starts Strategic Step with Kick-
                                     Off of Ulubelu Extension 1 Exploration at Gunung Tiga, Tanggamus Regency

The company hereby announce the Material Information or Facts Report as follows

 Name of Issuer or Public Company            PT Pertamina Geothermal Energy Tbk

 Business Activities                         Menyelenggarakan usaha bidang panas bumi dari hulu/hilir


 Telephone                                   +62 21 3983 3222

 Faximile                                    +62 21 3983 3230

 Email Address                               datapge@pertamina.com


 Date of Event                               20 December 2024

                                             PT Pertamina Geothermal Energy Tbk (PGE) Starts Strategic
 Type of Material Information or Facts       Step with Kick-Off of Ulubelu Extension 1 Exploration at
                                             Gunung Tiga, Tanggamus Regency
Page 5
 Description of Material Information or     PT Pertamina Geothermal Energy Tbk (PGE) (IDX: PGEO) is
 Facts                                      pleased to announce the commencement of its exploration
                                            project in the Gunung Tiga area through a kick-off held at the
                                            exploration wellpad location plan located in Gunung Tiga
                                            Village, Ulubelu District, Tanggamus Regency, Lampung
                                            Province (17/12). This exploration aims to prove the potential
                                            of geothermal energy reserves of 55 Megawatts (MW) which is
                                            expected to become a new source of clean energy that will
                                            support national energy security and the energy transition
                                            target towards net zero emission by 2060.

                                            PGE Exploration and Development Director Edwil Suzandi
                                            said that the kick-off of the Gunung Tiga Geothermal Working
                                            Area development project is an important milestone in the
                                            effort to develop geothermal energy in Indonesia. We are
                                            optimistic that this exploration will prove reserves of
                                            approximately 55 MW, which not only adds to our renewable
                                            energy capacity, but also serves as a form of our commitment
                                            to revive the ecosystem, empower the community, and drive
                                            the economy in Lampung and Sumatra. Together, through
                                            synergy and collaboration, we not only realize green energy for
                                            the nation, but also create a valuable legacy for future
                                            generations, said Edwil Suzandi.

                                            Gunung Tiga was chosen as one of the strategic locations for
                                            PGE's exploration project that started in 2024 due to its
                                            geothermal characteristics and promising potential. Project
                                            Manager of the Ulubelu Extension 1 (Gunung Tiga)
                                            Exploration Project Sapto Trianggo added that the exploration
                                            project includes the implementation of three exploration wells
                                            that will be carried out in stages in accordance with applicable
                                            safety and environmental standards, Sapto said.

                                            The project also involves close collaboration with local
                                            communities to ensure sustainable economic, social and
                                            environmental benefits. As part of the commitment to
                                            sustainability, the project will be executed by prioritizing
                                            aspects of environmental protection and risk management.
                                            This is in line with the support of the community around the
                                            exploration area, particularly Gunung Tiga Village, which
                                            enthusiastically welcomes the project. Environmental impact
                                            studies (AMDAL) have been conducted previously, and all
                                            exploration activities will be closely monitored to minimize
                                            negative impacts on the surrounding ecosystem.

                                            This exploration project is one of PGE's strategic steps to
                                            support Indonesia's energy self-sufficiency target and open
                                            new opportunities in geothermal energy development while
                                            creating jobs for local communities, driving regional economic
                                            growth, and accelerating Indonesia's transition to a greener
                                            and more sustainable energy future.

 Impact of event, material information or
 facts towards Issuers or Public
 Company’s operational activities, legal,
 financial condition, or going concern




Thus to be informed accordingly.


Respectfully,
Page 6
PT Pertamina Geothermal Energy Tbk




Kitty Andhora

Corporate Secretary




PT Pertamina Geothermal Energy Tbk
Grha Pertamina - Tower Pertamax Lt.7
Phone : +62 21 3983 3222, Fax : +62 21 3983 3230, https://www.pge.pertamina.com



Sender Name                        Kitty Andhora

Function                           Corporate Secretary

Date and Time                      20-12-2024 17:51




  This is an official document of PT Pertamina Geothermal Energy Tbk that does not require a signature as it was
     generated electronically by the electronic reporting system. PT Pertamina Geothermal Energy Tbk is fully
                           responsible for the information contained within this document.

File

File Open PDF
Source IDX
Size0.01 MB
Published20 Dec 2024
Pages6
Characters13,955
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 3 people and organisations named in the text · linked when the evidence is strong

linked org Pertamina Geothermal Energy Tbk · Nama Perusahaan p.1 ×54
linked person Edwil Suzandi p.2 ×4
unresolved person Kitty Andhora · Corporate Secretary p.3 ×2

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result