Source file signed link, expires in 15 minutes
Extracted text 223
Page 1
PT. INDIKA ENERGY Tbk DAN ENTITAS ANAK/ PT. INDIKA ENERGY Tbk AND ITS SUBSIDIARIES LAPORAN KEUANGAN KONSOLIDASIAN/ CONSOLIDATED FINANCIAL STATEMENTS TANGGAL 30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT)/ AS OF SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023 AND FOR THE NINE-MONTH PERIODS ENDED SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
Page 2
PT. INDIKA ENERGY Tbk DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk AND ITS SUBSIDIARIES
DAFTAR ISI TABLE OF CONTENTS
Halaman/
Page
SURAT PERNYATAAN DIREKSI DIRECTORS’ STATEMENT LETTER
LAPORAN KEUANGAN KONSOLIDASIAN – Tanggal CONSOLIDATED FINANCIAL STATEMENTS – As of
30 September 2024 (tidak diaudit) dan 31 September 30, 2024 (unaudited) and
Desember 2023 dan untuk periode sembilan bulan December 31, 2023 and for the nine-month
yang berakhir 30 September 2024 dan 2023 periods ended September 30, 2024 and 2023
(tidak diaudit) (unaudited)
Laporan Posisi Keuangan Konsolidasian 1 Consolidated Statements of Financial Position
Laporan Laba Rugi dan Penghasilan Komprehensif 3 Consolidated Statements of Profit or Loss and Other
Lain Konsolidasian Comprehensive Income
Laporan Perubahan Ekuitas Konsolidasian 4 Consolidated Statements of Changes in Equity
Laporan Arus Kas Konsolidasian 5 Consolidated Statements of Cash Flows
Catatan atas Laporan Keuangan Konsolidasian 6 Notes to Consolidated Financial Statements
Page 3
Page 4
Page 5
PT. INDIKA ENERGY Tbk DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk AND ITS SUBSIDIARIES
LAPORAN POSISI KEUANGAN KONSOLIDASIAN CONSOLIDATED STATEMENTS OF FINANCIAL POSITION
TANGGAL 30 SEPTEMBER 2024 (TIDAK DIAUDIT) AS OF SEPTEMBER 30, 2024 (UNAUDITED)
DAN 31 DESEMBER 2023 AND DECEMBER 31, 2023
30 September/ 31 Desember/
Catatan/ September 30, December 31,
Notes 2024 2023
US$ US$
ASET ASSETS
ASET LANCAR CURRENT ASSETS
Kas dan setara kas 5 706.346.794 449.204.420 Cash and cash equivalents
Aset keuangan lainnya - jatuh tempo dalam satu tahun 6 119.996.600 133.654.475 Other financial assets - current maturities
Piutang usaha 7 Trade accounts receivable
Pihak berelasi 52 81.693.854 80.612.755 Related parties
Pihak ketiga - setelah dikurangi Third parties - net of allowance
cadangan kerugian kredit sebesar for credit losses of US$ 669,752
US$ 669.752 tanggal 30 September 2024 as of September 30, 2024 (December 31, 2023:
(31 Desember 2023: US$ 645.382) 304.886.713 262.997.390 US$ 645,382)
Aset kontrak 8 40.368.191 19.506.377 Contract asset
Piutang lain-lain yang jatuh tempo dalam satu tahun 9 Current maturities of other accounts receivable
Pihak ketiga - setelah dikurangi cadangan kerugian Third parties - net of allowance for credit
kredit sebesar US$ 292.783 tanggal losses of US$ 292,783 as of September 30, 2024
30 September 2024 (31 Desember 2023: US$ nihil) 31.796.514 32.372.076 (December 31, 2023: US$ nil)
Persediaan - setelah dikurangi penyisihan penurunan Inventories - net of allowance for decline
nilai sebesar US$ 1.315.679 tanggal 30 September 2024 in value of US$ 1,315,679 as of September 30, 2024
(31 Desember 2023: US$ 1.207.125) 10 78.801.562 51.339.007 (December 31, 2023: US$ 1,207,125)
Piutang dividen 15 2.760.000 - Dividend receivable
Pajak dibayar dimuka 11 81.720.021 72.734.833 Prepaid taxes
Aset biologis 12 722.589 414.271 Biological asset
Aset derivatif 26 - 689.188 Derivative assets
Aset lancar lainnya 13 130.796.430 116.575.208 Other current assets
1.579.889.268 1.220.100.000
Aset tidak lancar yang dimiliki untuk dijual 14 295.680 264.002.477 Non-current assets held-for-sale
Jumlah Aset Lancar 1.580.184.948 1.484.102.477 Total Current Assets
ASET TIDAK LANCAR NONCURRENT ASSETS
Aset keuangan lainnya - setelah dikurangi bagian Other financial assets - net of current
yang jatuh tempo dalam satu tahun 6 71.458.584 113.457.446 maturities
Piutang lain-lain setelah dikurangi bagian 9 Other accounts receivable - net of
yang jatuh tempo dalam satu tahun current maturities
Pihak berelasi - setelah dikurangi cadangan Related parties - net of allowance for
kerugian kredit sebesar US$ 2.800.164 credit losses of US$ 2,800,164
tanggal 30 September 2024 as of September 30, 2024
(31 Desember 2023: US$ 2.749.668) 52 17.864.282 20.375.957 (December 31, 2023: US$ 2,749,668)
Pihak ketiga 5.311.904 5.078.780 Third parties
Investasi pada entitas asosiasi dan ventura bersama 15 256.034.000 264.581.258 Investments in associates and joint ventures
Klaim pengembalian pajak - setelah dikurangi provisi klaim Claims for tax refund - net of provision of claims for
pengembalian pajak sebesar US$ nihil tanggal tax refund of US$ nil as of September 30,
30 September 2024 (31 Desember 2023: US$ 29.847.534) 16 22.634.493 23.526.588 2024 (December 31, 2023: US$ 29,847,534)
Aset eksplorasi dan evaluasi - setelah dikurangi Exploration and evaluation assets - net of
cadangan kerugian penurunan nilai sebesar impairment losses of US$ 17,012,796
US$ 17.012.796 tanggal 30 September 2024 as of September 30, 2024
(31 Desember 2023: US$ 21.338.795) 17 111.815.576 102.123.524 (December 31, 2023: 21,338,795)
Properti pertambangan - setelah dikurangi Mining properties - net of accumulated
akumulasi amortisasi sebesar US$ 23.263.821 amortization of US$ 23,263,821
tanggal 30 September 2024 (31 Desember 2023: as of September 30, 2024 (December 31, 2023:
US$ 23.208.373) 18 6.333.961 5.707.631 US$ 23,208,373)
Tanaman produktif - tanaman belum
menghasilkan 21 12.680.014 9.750.025 Bearer plants - immature plantations
Aset tetap - setelah dikurangi akumulasi
penyusutan sebesar US$ 536.515.361 Property, plant and equipment - net of
tanggal 30 September 2024 (31 Desember 2023: accumulated depreciation of US$ 536,515,361
US$ 517.983.511) dan setelah dikurangi as of September 30, 2024 (December 31, 2023:
cadangan kerugian penurunan nilai sebesar US$ 517,983,511) and allowance for
US$ 927.724 tanggal 30 September 2024 impairment losses of US$ 927,724 as of
(31 Desember 2023: US$ 2.581.733) 22 362.729.244 307.121.122 September 30, 2024 (December 31, 2023: US$ 2,581,733)
Aset hak-guna - setelah dikurangi akumulasi Right-of-use assets - net of accumulated
penyusutan sebesar US$ 61.922.552 tanggal depreciation of US$ 61,922,552 as of
30 September 2024 (31 Desember 2023: September 30, 2024 (December 31, 2023:
US$ 54.409.759) 23 13.485.497 16.964.411 US$ 54,409,759)
Aset tidak berwujud - setelah dikurangi akumulasi amortisasi Intangible assets - net of accumulated amortization
sebesar US$ US$ 13.779.683 tanggal 30 September 2024 of US$ 13,779,683 as of September 30, 2024
(31 Desember 2023: US$ 748.667.649) dan (December 31, 2023 : US$ 748,667,649) and
setelah dikurangi cadangan kerugian penurunan nilai allowance for impairment losses
sebesar US$ 1.531.781 tanggal 30 September 2024 of US$ 1,531,781 as of September 30, 2024
(31 Desember 2023: US$ 30.889.820) 24 38.243.206 36.761.135 (December 31, 2023: US$ 30,889,820)
Goodwill 25 651.606.747 649.164.208 Goodwill
Uang jaminan 2.976.238 2.489.197 Refundable deposits
Aset pajak tangguhan 47 20.372.267 25.581.704 Deferred tax assets
Uang muka dan aset tidak lancar lainnya 20 54.540.521 46.316.927 Advances and other noncurrent assets
Jumlah Aset Tidak Lancar 1.648.086.534 1.628.999.913 Total Noncurrent Assets
JUMLAH ASET 3.228.271.482 3.113.102.390 TOTAL ASSETS
Lihat catatan atas laporan keuangan konsolidasian yang merupakan See accompanying notes to consolidated financial statements
bagian yang tidak terpisahkan dari laporan keuangan konsolidasian. which are an integral part of the consolidated financial statements.
-1-
Page 6
PT. INDIKA ENERGY Tbk DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk AND ITS SUBSIDIARIES
LAPORAN POSISI KEUANGAN KONSOLIDASIAN CONSOLIDATED STATEMENTS OF FINANCIAL POSITION
TANGGAL 30 SEPTEMBER 2024 (TIDAK DIAUDIT) AS OF SEPTEMBER 30, 2024 (UNAUDITED)
DAN 31 DESEMBER 2023 AND DECEMBER 31, 2023
30 September/ 31 Desember/
Catatan/ September 30, December 31,
Notes 2024 2023
US$ US$
LIABILITAS DAN EKUITAS LIABILITIES AND EQUITY
LIABILITAS JANGKA PENDEK CURRENT LIABILITIES
Pinjaman jangka pendek 27 71.103.748 58.409.213 Short-term loans
Utang usaha 28 Trade accounts payable
Pihak berelasi 52 5.138.049 4.077.079 Related parties
Pihak ketiga 296.512.995 273.893.283 Third parties
Liabilitas kontrak 8 15.126.195 10.572.038 Contract liabilities
Utang pajak 29 15.068.477 15.518.704 Taxes payable
Utang lain-lain kepada pihak ketiga dan biaya Other accounts payable to third parties and
masih harus dibayar 30 130.615.020 186.473.844 accrued expenses
Uang muka dari pihak ketiga 9.467.686 15.643.267 Advances from third parties
Utang dividen 39 4.049.975 10.743 Dividends payable
Liabilitas jangka panjang yang jatuh tempo dalam satu tahun Current maturities of long-term liabilities
Pinjaman jangka panjang - pihak ketiga 31 46.408.668 58.297.225 Long-term loans - third parties
Liabilitas sewa 33 9.063.499 7.870.164 Lease liabilities
Utang obligasi - bersih 34 226.157.281 304.359.120 Bonds payable - net
828.711.593 935.124.680
Liabilitas terkait langsung dengan aset tidak lancar Liabilities directly related to non-current assets
yang dimiliki untuk dijual 14 - 47.365.177 held for sale
Jumlah Liabilitas Lancar 828.711.593 982.489.857 Total Current Liabilities
LIABILITAS JANGKA PANJANG NONCURRENT LIABILITIES
Liabilitas jangka panjang - setelah dikurangi
bagian yang jatuh tempo dalam satu tahun Long-term liabilities - net of current maturities
Pinjaman jangka panjang 31 Long-term loans
Pihak berelasi 52 1.294.782 1.253.300 Related party
Pihak ketiga 459.910.651 104.275.570 Third parties
Pinjaman yang dapat dikonversikan 32 21.906.240 20.092.531 Convertible loans
Liabilitas sewa 33 4.151.157 8.450.249 Lease liabilities
Utang obligasi - bersih 34 449.034.279 528.922.780 Bonds payable - net
Utang jangka panjang lainnya - pihak ketiga 1.950.294 439.668 Other long-term liability - third party
Provisi rehabilitasi tambang, penutupan Provision for mine rehabilitation, mine closure
tambang dan pembongkaran 35 44.165.139 43.265.139 and decommissioning
Liabilitas pajak tangguhan 47 9.169.792 12.253.706 Deferred tax liabilities
Liabilitas derivatif 32 9.013.128 8.109.675 Derivative liabilities
Imbalan kerja 36 28.815.681 26.412.465 Employee benefits
Jumlah Liabilitas Tidak Lancar 1.029.411.143 753.475.083 Total Noncurrent Liabilities
Jumlah Liabilitas 1.858.122.736 1.735.964.940 Total Liabilities
EKUITAS EQUITY
Modal saham - nilai nominal Rp 100 per saham Capital stock - Rp 100 par value per share
Modal dasar - 17.000.000.000 saham Authorized - 17,000,000,000 shares
Modal ditempatkan dan disetor dan saham treasuri Subscribed and paid-up and treasury shares
- 5.210.192.000 saham pada 30 September 2024 - 5,210,192,000 shares as of September 30, 2024
(31 Desember 2023: 5.210.192.000 saham) 37 56.892.154 56.892.154 (December 31, 2023: 5,210,192,000 shares)
Tambahan modal disetor 38 253.826.135 253.826.135 Additional paid-in capital
Komponen ekuitas lainnya 17.270.503 (12.109.145) Other components of equity
Saham treasuri 1c (359.945) (359.945) Treasury shares
Saldo laba Retained earnings
Dicadangkan 59 11.378.431 11.378.431 Appropriated
Tidak dicadangkan 894.130.890 923.214.754 Unappropriated
Jumlah ekuitas yang dapat diatribusikan Total equity attributable to owners
kepada pemilik entitas induk 1.233.138.168 1.232.842.384 of the Company
Kepentingan non-pengendali 39 137.010.578 144.295.066 Non-controlling interests
Jumlah Ekuitas 1.370.148.746 1.377.137.450 Total Equity
JUMLAH LIABILITAS DAN EKUITAS 3.228.271.482 3.113.102.390 TOTAL LIABILITIES AND EQUITY
Lihat catatan atas laporan keuangan konsolidasian yang merupakan See accompanying notes to consolidated financial statements
bagian yang tidak terpisahkan dari laporan keuangan konsolidasian. which are an integral part of the consolidated financial statements.
-2-
Page 7
PT. INDIKA ENERGY Tbk DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk AND ITS SUBSIDIARIES
LAPORAN LABA RUGI DAN PENGHASILAN CONSOLIDATED STATEMENTS OF PROFIT OR LOSS
KOMPREHENSIF LAIN KONSOLIDASIAN AND OTHER COMPREHENSIVE INCOME
UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR FOR THE NINE-MONTH PERIODS ENDED
30 SEPTEMBER 2024 DAN 2023 (TIDAK AUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
Catatan/
Notes 2024 2023
US$ US$
PENDAPATAN 40,52 1.784.167.627 2.298.728.542 REVENUES
BEBAN POKOK KONTRAK DAN PENJUALAN 41,52 (1.514.774.273) (1.858.953.754) COST OF CONTRACTS AND GOODS SOLD
LABA KOTOR 269.393.354 439.774.788 GROSS PROFIT
Bagian laba bersih entitas asosiasi dan Equity in net profit of associates and
ventura bersama 15 14.445.558 19.212.983 joint ventures
Amortisasi aset tidak berwujud 24 (981.258) (36.307.205) Amortization of intangible assets
Beban penjualan, umum dan administrasi 42 (133.146.323) (193.464.531) Selling, general and administrative expenses
Pendapatan investasi 43,52 16.401.114 14.853.092 Investment income
Beban keuangan 44 (71.757.868) (62.564.175) Finance costs
Beban pajak final 46 (5.834.617) (5.176.169) Final tax
Kerugian penurunan nilai 14 (2.077.946) - Impairment loss
Lain-lain - bersih 45 8.771.278 5.570.863 Others - net
LABA SEBELUM PAJAK 95.213.292 181.899.646 PROFIT BEFORE TAX
BEBAN PAJAK 47 (42.882.722) (62.218.016) INCOME TAX EXPENSE
LABA BERSIH PERIODE BERJALAN 52.330.570 119.681.630 PROFIT FOR THE PERIOD
PENGHASILAN (RUGI) KOMPREHENSIF LAIN OTHER COMPREHENSIVE INCOME (LOSS)
Pos-pos yang tidak akan direklasifikasi ke laba rugi: Item that will not be reclassified subsequently to profit or loss:
Pengukuran kembali atas kewajiban imbalan pasti 36,39 217.596 (708.248) Remeasurement of defined benefits obligation
Pos-pos yang akan direklasifikasi ke laba rugi: Items that may be reclassified subsequently to profit or loss:
Akumulasi selisih kurs karena penjabaran
laporan keuangan 39 146.612 (1.022.494) Cumulative translation adjustments
(Kerugian) keuntungan yang belum direalisasi
atas instrumen keuangan derivatif Unrealized (loss) gain on derivative financial instrument
(hedging reserve) 15,26,39 (7.517.105) 7.939.137 (hedging reserve)
(Kerugian) keuntungan yang belum direalisasi
atas investasi pada nilai wajar melalui Unrealized (loss) gain on investment stated at fair
penghasilan komprehensif lainnya 39 (3.272.793) 680.097 value through other comprehensive income
Jumlah penghasilan komprehensif lain periode Total other comprehensive income for the period,
berjalan setelah pajak (10.425.690) 6.888.492 net of tax
JUMLAH PENGHASILAN KOMPREHENSIF TOTAL COMPREHENSIVE INCOME FOR
PERIODE BERJALAN 41.904.880 126.570.122 THE PERIOD
LABA PERIODE BERJALAN YANG DAPAT
DIATRIBUSIKAN KEPADA: PROFIT FOR THE PERIOD ATTRIBUTABLE TO:
Pemilik entitas induk 48 34.408.565 93.839.629 Owners of the Company
Kepentingan non-pengendali 39 17.922.005 25.842.001 Non-controlling interests
Jumlah 52.330.570 119.681.630 Total
JUMLAH PENGHASILAN KOMPREHENSIF TOTAL COMPREHENSIVE INCOME FOR THE PERIOD
PERIODE BERJALAN YANG DAPAT DIATRIBUSIKAN KEPADA: ATTRIBUTABLE TO:
Pemilik entitas induk 29.458.171 94.465.869 Owners of the Company
Kepentingan non-pengendali 39 12.446.709 32.104.253 Non-controlling interests
Jumlah 41.904.880 126.570.122 Total
LABA PER SAHAM 48 EARNINGS PER SHARE
Dasar 0,0066 0,0180 Basic
Lihat catatan atas laporan keuangan konsolidasian yang merupakan See accompanying notes to consolidated financial statements
bagian yang tidak terpisahkan dari laporan keuangan konsolidasian. which are an integral part of the consolidated financial statements.
-3-
Page 8
PT. INDIKA ENERGY Tbk DAN ENTITAS ANAK , PT. INDIKA ENERGY Tbk AND ITS SUBSIDIARIES
LAPORAN PERUBAHAN EKUITAS KONSOLIDASIAN CONSOLIDATED STATEMENTS OF CHANGES IN EQUITY
UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR FOR THE NINE-MONTH PERIODS ENDED
30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
Komponen Ekuitas Lainnya/Other Components of Equity
Keuntungan (kerugian) Pengukuran kembali Akumulasi keuntungan Selisih nilai
yang belum atas program imbalan (kerugian) yang belum transaksi
direalisasi atas Akumulasi pasti sesuai dengan direalisasi atas investasi ekuitas dengan
instrumen keuangan selisih kurs PSAK 24, pada nilai wajar melalui kepentingan
derivatif Modal lain-lain - penjabaran Imbalan Kerja/ penghasilan komprehensif non-pengendali/ Ekuitas yang dapat
Tambahan (hedging reserve )/ opsi saham laporan Remeasurement of lainnya/ Cumulative Difference in value diatribusikan kepada
modal Unrealized gain (loss) karyawan/ keuangan/ defined benefits unrealized gain (loss) on of equity Saldo laba/ pemilik entitas induk/ Kepentingan
disetor/ on derivative Other capital - Cumulative liability in accordance investment stated at fair transactions with Ekuitas Retained earnings Equity attributable non-pengendali/
Catatan/ Modal disetor/ Additional Saham Treasuri/ financial instrument employee translation with PSAK 24, value through other non-controlling lainnya/ Dicadangkan/ Tidak dicadangkan/ to owners of Non-controlling Jumlah ekuitas/
Notes Capital stock paid-in capital Treasuri shares (hedging reserve) stock option adjustments Employee Benefits comprehensive income interests Other equity Appropriated Unappropriated the Company interests Total equity
US$ US$ US$ US$ US$ US$ US$ US$ US$ US$ US$ US$ US$ US$ US$
Saldo per 1 Januari 2023 56.892.154 253.826.135 (359.945) 7.260.578 7.816.296 (3.337.051) 4.157.804 11.238.462 (2.087.585) (34.285.087) 5.312.496 882.849.440 1.189.283.697 150.890.266 1.340.173.963 Balance as of January 1, 2023
Laba bersih periode berjalan - - - - - - - - - - - 93.839.629 93.839.629 25.842.001 119.681.630 Profit for the period
Penghasilan (rugi) komprehensif lain Other comprehensive income (loss)
Pengukuran kembali atas Remeasurement of defined benefits
kewajiban manfaat pasti 36,39 - - - - - - (708.248) - - - - - (708.248) - (708.248) obligation
Keuntungan yang belum direalisasi Unrealized gain on derivative
atas instrumen keuangan financial instrument (hedging
derivatif (hedging reserve) 15,26,39 - - - 787.549 - - - - - - - - 787.549 7.151.588 7.939.137 reserve)
Akumulasi selisih kurs karena
penjabaran laporan keuangan 39 - - - - - (133.158) - - - - - - (133.158) (889.336) (1.022.494) Cumulative translation adjustments
Keuntungan yang belum direalisasi
atas investasi pada nilai wajar Unrealized gain on investment
melalui penghasilan komprehensif stated at fair value through other
lainnya 39 - - - - - - - 680.097 - - - - 680.097 - 680.097 comprehensive income
Jumlah penghasilan (rugi) komprehensif - - - 787.549 - (133.158) (708.248) 680.097 - - - 93.839.629 94.465.869 32.104.253 126.570.122 Total comprehensive income (loss)
Akuisisi tambahan kepemilikan saham Acquisition of additional shares
di PT Cotrans Asia 1d, 39 - - - - - - - - - - - - - 2.171.542 2.171.542 in PT Cotrans Asia
Pencadangan laba ditahan 59 - - - - - - - - - - 6.065.935 (6.065.935) - - - Appropriation retained earnings
Pendirian entitas anak di PT Bioneer Establishment of PT Bioneer
Indika Group 1d, 24, 39 - - - - - - - - - - - - - 2.000.000 2.000.000 Indika Group
Uang muka setoran modal dari Advance share capital received from
kepentingan non pengendali 1.719.401 1.719.401 non-controlling interest
Dividen entitas anak 39 - - - - - - - - - - - - - (36.000.000) (36.000.000) Dividends of subsidiaries
Dividen 59 - - - - - - - - - - - (73.252.551) (73.252.551) - (73.252.551) Dividend
Saldo per 30 September 2023 56.892.154 253.826.135 (359.945) 8.048.127 7.816.296 (3.470.209) 3.449.556 11.918.559 (2.087.585) (34.285.087) 11.378.431 897.370.583 1.210.497.015 152.885.462 1.363.382.477 Balance as of September 30, 2023
Saldo per 1 Januari 2024 56.892.154 253.826.135 (359.945) 4.642.549 7.816.296 (2.230.664) 3.245.833 10.789.513 (2.087.585) (34.285.087) 11.378.431 923.214.754 1.232.842.384 144.295.066 1.377.137.450 Balance as of January 1, 2024
Laba bersih periode berjalan - - - - - - - - - - - 34.408.565 34.408.565 17.922.005 52.330.570 Profit for the period
Penghasilan (rugi) komprehensif lain Other comprehensive income (loss)
Pengukuran kembali atas Remeasurement of defined benefits
kewajiban manfaat pasti 36,39 - - - - - - 217.596 - - - - - 217.596 - 217.596 obligation
Kerugian yang belum Unrealized loss on derivative
direalisasi atas instrumen keuangan financial instrument (hedging
derivatif (hedging reserve) 15,26,39 - - - (2.431.156) - - - - - - - - (2.431.156) (5.085.949) (7.517.105) reserve)
Akumulasi selisih kurs karena
penjabaran laporan keuangan 39 - - - - - 535.959 - - - - - - 535.959 (389.347) 146.612 Cumulative translation adjustments
Kerugian yang belum direalisasi
atas investasi pada nilai wajar Unrealized loss on investment
melalui penghasilan komprehensif stated at fair value through other
lainnya 39 - - - - - - - (3.272.793) - - - - (3.272.793) - (3.272.793) comprehensive income
Jumlah penghasilan komprehensif - - - (2.431.156) - 535.959 217.596 (3.272.793) - - - 34.408.565 29.458.171 12.446.709 41.904.880 Total comprehensive income
Akuisisi saham di GSI 1d,39 - - - - - - - - - - - - 1.602.419 1.602.419 Acquisition of shares in GSI
Penurunan investasi IPA 1, 39 - - - - - - - - 837.613 - - 837.613 605.661 1.443.274 Decrease of investment in IPA
Divestasi entitas anak 1,14 - - - - - - - - - 33.492.429 - (33.492.429) - (548.408) (548.408) Divestment of subsidiary
Dividen entitas anak 39 - - - - - - - - - - - - - (21.390.869) (21.390.869) Dividends of subsidiaries
Dividen 59 - - - - - - - - - - - (30.000.000) (30.000.000) - (30.000.000) Dividend
Saldo per 30 September 2024 56.892.154 253.826.135 (359.945) 2.211.393 7.816.296 (1.694.705) 3.463.429 7.516.720 (2.087.585) 44.955 11.378.431 894.130.890 1.233.138.168 137.010.578 1.370.148.746 Balance as of September 30, 2024
Lihat catatan atas laporan keuangan konsolidasian yang merupakan See accompanying notes to consolidated financial statements
bagian yang tidak terpisahkan dari laporan keuangan konsolidasian. which are an integral part of the consolidated financial statements.
-4-
Page 9
PT. INDIKA ENERGY Tbk DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk AND ITS SUBSIDIARIES
LAPORAN ARUS KAS KONSOLIDASIAN CONSOLIDATED STATEMENTS OF CASH FLOWS
UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR FOR THE NINE-MONTH PERIODS ENDED
30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
2024 2023
US$ US$
ARUS KAS DARI AKTIVITAS OPERASI CASH FLOWS FROM OPERATING ACTIVITIES
Penerimaan kas dari pelanggan 1.731.003.883 2.442.635.574 Cash receipts from customers
Pengeluaran kas kepada pemasok (1.214.233.851) (1.380.967.215) Cash paid to suppliers
Pengeluaran kas kepada direktur, komisaris dan karyawan (83.538.137) (86.781.265) Cash paid to directors, commissioners and employees
Pembayaran royalti kepada Pemerintah (368.121.307) (520.829.263) Payments of royalty to Government
Kas yang diperoleh dari operasi 65.110.588 454.057.831 Cash generated from operations
Penerimaan klaim pengembalian pajak 29.902.383 18.241.649 Receipt from claims for tax refund
Penghasilan bunga 15.871.129 11.264.935 Interest received
Pembayaran beban keuangan (57.689.627) (45.170.809) Finance costs paid
Pembayaran klaim pengembalian pajak (8.442.566) - Payment of claims for tax refund
Pembayaran pajak penghasilan dan pajak lainnya (97.254.736) (673.232.946) Income and other taxes paid
Kas Bersih yang Digunakan untuk
Aktivitas Operasi (52.502.829) (234.839.340) Net Cash Used in Operating Activities
ARUS KAS DARI AKTIVITAS INVESTASI CASH FLOWS FROM INVESTING ACTIVITIES
Pencairan aset keuangan lainnya 319.616.173 28.317.378 Withdrawal of other financial assets
Hasil penjualan aset tetap 13.558.569 145.681 Proceeds from sale of property, plant and equipment
Penerimaan dividen 3.007.674 8.401.200 Dividends received
Penerimaan piutang lain-lain dari pihak berelasi 3.340.000 1.440.000 Proceeds of other accounts receivable from related parties
Pembayaran aset eksplorasi dan evaluasi dan Payment for exploration and evaluation assets and
properti pertambangan (5.812.369) (54.118.355) mining property
Kenaikan investasi di entitas asosiasi dan ventura bersama (1.274.554) (11.689.347) Increase in investments in associates and joint venture
Kenaikan piutang lain-lain dari pihak berelasi (123.167) - Increase of other accounts receivable from related party
Akuisisi entitas anak, setelah dikurangi dengan
kas yang diperoleh (13.164.350) 6.460.672 Acquisition of subsidiaries net off cash acquired
Likuidasi entitas asosiasi 48.147 - Liquidation of an associate entity
Perolehan aset tidak berwujud (1.016.909) (126.870) Acquisition of intangible assets
Penerimaan bersih dari divestasi entitas anak, setelah biaya transaksi 200.996.448 - Net proceed from divestment of subsidiaries, net of transaction costs
Penerimaan uang muka terkait dengan aset tidak lancar Receipt of advance payment related to non-current assets
yang dimiliki untuk dijual - 8.796.022 held for sale
Pembayaran uang muka dan aset tidak lancar lainnya (18.391.093) (7.358.655) Payment of advances and other noncurrent assets
Perolehan aset tetap (49.655.567) (30.171.600) Acquisitions of property, plant and equipment
Penempatan aset keuangan lainnya (265.518.927) (107.088.720) Placement of other financial assets
Kas Bersih yang Diperoleh dari (Digunakan untuk)
Aktivitas Investasi 185.610.075 (156.992.594) Net Cash Provided by (Used in) Investing Activities
ARUS KAS DARI AKTIVITAS PENDANAAN CASH FLOWS FROM FINANCING ACTIVITIES
Penerimaan bersih pinjaman jangka pendek, pinjaman yang dapat Net proceeds of short-term loans, convertible loan and
dikonversikan dan utang jangka panjang, setelah biaya transaksi 525.299.404 171.942.490 long-term loans, net off loan issuance costs
Penerimaan uang muka setoran modal dari kepemilikan Proceeds from advance for share capital from
non-pengendali - 1.719.401 non-controlling interests
Penerimaan dari penerbitan saham baru 1.443.274 - Proceed from issuance of new shares
Penerimaan bersih dari penerbitan utang obligasi, Net proceeds from issuance of bonds payable,
setelah biaya emisi obligasi 450.669.267 - net off with bond issuance cost
Pembayaran utang obligasi dan premi (629.368.753) (28.739.367) Payments of bonds payable and premium
Pembayaran biaya transaksi utang bank (425.325) (2.435.509) Payment of bank loan transaction cost
Pembayaran dividen entitas anak kepada Payment of dividends by subsidiaries to
kepentingan non-pengendali (17.340.894) (39.684.837) non-controlling interests
Pembayaran dividen (30.000.000) (73.252.551) Dividend payment
Pembayaran pinjaman jangka pendek, utang jangka Payments of short-term loans, long-term loans
panjang dan sewa pembiayaan (175.263.592) (123.564.470) and lease liabilities
Kas Bersih yang Diperoleh dari (Digunakan untuk)
Aktivitas Pendanaan 125.013.381 (94.014.843) Net Cash Provided by (Used in) Financing Activities
KENAIKAN (PENURUNAN) BERSIH KAS DAN SETARA KAS 258.120.627 (485.846.777) NET INCREASE (DECREASE) IN CASH AND CASH EQUIVALENTS
CASH AND CASH EQUIVALENTS
KAS DAN SETARA KAS AWAL PERIODE 449.204.420 1.155.539.134 AT BEGINNING OF PERIOD
Pengaruh perubahan kurs mata uang asing (978.253) 1.036.607 Effects of changes in foreign exchange rate
CASH AND CASH EQUIVALENTS
KAS DAN SETARA KAS AKHIR PERIODE 706.346.794 670.728.964 AT END OF PERIOD
Lihat catatan atas laporan keuangan konsolidasian yang merupakan See accompanying notes to consolidated financial statements
bagian yang tidak terpisahkan dari laporan keuangan konsolidasian. which are an integral part of the consolidated financial statements.
-5-
Page 10
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
1. UMUM 1. GENERAL
a. Pendirian dan Informasi Umum a. Establishment and General Information
PT. Indika Energy Tbk. (“Perusahaan”) didirikan PT. Indika Energy Tbk. (the “Company”) was
berdasarkan Akta Notaris No. 31 tanggal established based on Notarial Deed No. 31 dated
19 Oktober 2000 oleh Hasanal Yani Ali Amin, S.H., October 19, 2000 by Hasanal Yani Ali Amin, S.H.,
notaris di Jakarta. Akta Pendirian ini disahkan oleh public notary in Jakarta. The Deed of
Menteri Kehakiman dan Hak Asasi Manusia Establishment was approved by the Minister of
Republik Indonesia dalam Surat Keputusannya Justice and Human Rights of the Republic of
No. C-13115 HT.01.01.TH.2001 tanggal Indonesia in his Decree No. C-13115
18 Oktober 2001 serta diumumkan dalam Berita HT.01.01.TH.2001 dated October 18, 2001, and
Negara No. 53, Tambahan No. 6412 tanggal 2 Juli was published in State Gazette No. 53,
2022. Akta Perusahaan telah mengalami beberapa Supplement No. 6412 dated July 2, 2022. The
kali perubahan, dan perubahan terakhir Company’s Deed has been amended several
sehubungan dengan perubahan dan times, and most recent amendment is related to
pengangkatan kembali susunan Dewan Komisaris amendment and re-appointment of composition of
dan Direksi Perusahaan adalah sebagaimana Board of Commissioners and Board of Directors of
tercantum di dalam Akta No. 11 tanggal 19 April the Company as reflected in the Deed No. 11 dated
2023 yang dibuat oleh Notaris Aryanti Artisari, April 19, 2023 by Aryanti Artisari, S.H., M.KN,
S.H., M.KN, Notaris di Jakarta Selatan. Akta Notary in South Jakarta. Such amendment has
perubahan tersebut telah diterima oleh been received by the Ministry of Law and Human
Kementerian Hukum dan Hak Asasi Manusia Rights of the Republic of Indonesia based on
Republik Indonesia berdasarkan Surat Penerimaan Receipt of Notification to Amendment of the
Pemberitahuan Perubahan Data Perusahaan Company’s Data No. AHU-AH.01.09-0118385
No. AHU-AH.01.09-0118385 tanggal 15 Mei 2023. dated May 15, 2023.
Sesuai dengan Pasal 3 Anggaran Dasar In accordance with Article 3 of the Company’s
Perusahaan, ruang lingkup kegiatan Perusahaan Articles of Association, the scope of its activities is
terutama meliputi bidang perdagangan, mainly to engage in trading, construction, mining,
pembangunan, pertambangan, pengangkutan dan transportation and services. The Company started
jasa. Perusahaan mulai beroperasi secara its commercial operations in 2004. As of
komersial pada tahun 2004. Pada tanggal September 30, 2024, the Group had total number
30 September 2024, Grup mempunyai karyawan of employees of 3,859 (including 1,528 non-
sebanyak 3.859 (termasuk 1.528 pegawai tidak permanent employees) (December 31, 2023:
tetap) (31 Desember 2023: 3.579 (termasuk 3,579 (including 1,673 non-permanent
1.673 pegawai tidak tetap)). employees)).
Perusahaan berdomisili di Jakarta, dengan kantor The Company is domiciled in Jakarta, and its head
pusatnya berlokasi di Gedung Mitra, Lantai 11, office is located at Mitra Building, 11th Floor,
Jl. Jenderal Gatot Subroto Kav. 21, Jakarta. Jl. Jenderal Gatot Subroto Kav. 21, Jakarta.
Susunan pengurus Perusahaan adalah sebagai The Company’s management consisted of the
berikut: following:
30 September/September 30 , 2024 dan/and
31 Desember/December 31 , 2023
Komisaris Utama Agus Lasmono President Commissioner
Wakil Komisaris Utama Richard Bruce Ness Vice President Commissioner
Komisaris Indracahya Basuki Commissioner
Komisaris Independen Farid Harianto Independent Commissioners
Eko Putro Sandjojo
Direktur Utama M. Arsjad Rasjid P.M *) President Director
Wakil Direktur Utama Azis Armand Vice President Director
Direktur Retina Rosabai Director
Direktur Purbaja Pantja Director
Direktur Kamen Kamenov Palatov Director
*) Direktur Utama Perusahaan, M. Arsjad Rasjid *) The Company’s President Director, M. Arsjad
P.M., mengajukan cuti di luar tanggungan Rasjid P.M., submitted leave request outside
-6-
Page 11
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
selama 6-8 bulan terhitung efektif sejak the responsibility for the 6-8 months starting
tanggal 27 September 2023, dimana cuti effective from September 27, 2023, which has
tersebut telah diterima dan disetujui oleh been accepted and approved by the
Dewan Komisaris Perusahaan. Pada saat yang Company’s Board of Commissioners. At the
bersamaan, beliau juga telah memberikan same time, he also has granted his Power of
kuasa (Surat Kuasa) kepada Wakil Direktur Attorney (POA) to the Vice President Director.
Utama. Direksi Perusahaan (BOD) setuju The Company’s board of directors (BOD)
bahwa, kecuali bilamana telah diatur dalam agrees that, unless otherwise governed under
Surat Kuasa, seluruh tugas dan wewenang BOD the POA, all duties and authorities of the BOD
selama cuti beliau harus dilaksanakan sesuai during his leave shall be done in accordance
dengan ketentuan dan secara khusus Pasal 15 with the provisions and particularly under
Anggaran Dasar Perusahaan dan mengacu Article 15 of the Company’s Article of
kepada Pemisahan Tugas BOD. Beliau Association and with reference to the
mengakhiri masa cutinya dan kembali efektif Segregation of Duties of the BOD. He has
bertugas pada tanggal 25 Maret 2024. ended his leave and returned to duty effective
on March 25, 2024.
Susunan ketua dan anggota komite audit adalah The chairman and members of the audit
sebagai berikut: committee are as follows:
30 September/September 30, 2024 dan/and
31 Desember/December 31, 2023
Ketua Eko Putro Sandjojo Chairman
Anggota Osman Sitorus Members
Harry Ponto
Suhardi Alius
Tonyadi Halim
Pada tanggal 30 September 2024, Sekretaris As of September 30, 2024, the Company’s
Perusahaan adalah Adi Pramono. Corporate Secretary is Adi Pramono.
Pada tanggal 30 September 2024, kepala Internal As of September 30, 2024, the Company’s Head
Audit Perusahaan adalah Einstein Erlangga. of Internal Audit is Einstein Erlangga.
b. Penawaran Umum Efek Perusahaan b. Public Offering of Shares of the Company
Pada tanggal 2 Juni 2008, Perusahaan On June 2, 2008, the Company obtained the
memperoleh pernyataan efektif dari Ketua Badan notice of effectivity from the Chairman of the
Pengawas Pasar Modal dan Lembaga Keuangan Capital Markets and Financial Institution Supervisory
dengan Surat No. S-3398/BL/2008 untuk Agency in his Letter No. S-3398/BL/2008 for its
melakukan penawaran umum atas 937.284.000 public offering of 937,284,000 shares. On
saham Perusahaan kepada masyarakat. Pada June 11, 2008, these shares were listed on the
tanggal 11 Juni 2008 saham tersebut telah Indonesia Stock Exchange.
dicatatkan pada Bursa Efek Indonesia.
Pada tanggal 30 September 2024 dan 31 As of September 30, 2024 and December 31,
Desember 2023 seluruh saham Perusahaan atau 2023, all of the Company's 5,210,192,000
sejumlah masing-masing 5.210.192.000 telah outstanding shares were listed on the Indonesia
dicatatkan pada Bursa Efek Indonesia. Stock Exchange.
-7-
Page 12
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
c. Pembelian Kembali Saham Perusahaan c. Share Buyback of the Company
Pada tanggal 8 April 2020, Perusahaan On April 8, 2020, the Company announced that it
mengumumkan rencananya untuk melakukan is planning to do buyback of its shares which have
pembelian kembali saham Perusahaan yang telah been issued and listed in Indonesia Stock
dikeluarkan dan tercatat di Bursa Efek Indonesia Exchange with reference to OJK Rule
(BEI) dengan mengacu kepada Peraturan Otoritas No. 2/POJK.04/2013 on Buyback of Shares in
Jasa Keuangan No. 2/POJK.04/2013 Pembelian Significantly Fluctuating Market Conditions and
Kembali Saham Yang Dikeluarkan Oleh Emiten OJK Circular Letter No. 3/SEOJK.04/2020 on
Atau Perusahaan Publik Dalam Kondisi Pasar Yang Other Conditions Constituting Significantly
Berfluktuasi Secara Signifikan dan Surat Edaran Fluctuating Market Conditions Allowing for Buyback
OJK No. 3/SEOJK.04/2020 tentang Kondisi Lain of Shares (“SEOJK No. 3/SEOJK.04/2020”). Share
Sebagai Kondisi Pasar Yang Berfluktuasi Signifikan buyback will be conducted by the Company, in the
Dalam Pelaksanaan Pembelian Kembali Saham amount of up to US$ 20,000,000 or equivalent to
Yang Dikeluarkan Oleh Emiten Atau Perusahaan Rp 300,000,000,000 assuming that United States
Publik (“SEOJK No.3/SEOJK.04/2020”). Pembelian Dollar to Indonesia Rupiah exchange rate of
kembali atas saham akan dilakukan oleh Rp 15,000.
Perusahaan, dengan jumlah sebanyak-banyaknya
US$ 20.000.000 atau setara dengan
Rp 300.000.000.000 dengan asumsi nilai tukar
Dolar Amerika Serikat ke Rupiah adalah
Rp 15.000.
Sesuai dengan SEOJK No. 3/SEOJK.04/2020, According to SEOJK No. 3/SEOJK.04/2020, the
jumlah saham yang akan dibeli kembali oleh Company is allowed to conduct buy back of its
Perusahaan tidak akan melebihi 20% (dua puluh shares for a maximum of 20% (twenty percent)
persen) dari jumlah modal disetor, dengan of the paid-up capital provided that at least 7.5%
ketentuan paling sedikit saham yang beredar (seven point five percent) of its issued and paid-
adalah 7,5% (tujuh koma lima persen) dari modal up capital continue to be held by the public. The
disetor dan ditempatkan dalam Perusahaan yang share buyback will be conducted gradually within
harus tetap dimiliki oleh masyarakat. Pembelian three months effective from April 9, 2020 until
kembali atas saham tersebut akan dilakukan July 8, 2020. The share buyback transaction will
secara bertahap dalam periode tiga bulan efektif be executed through Indonesia Stock Exchange.
sejak 9 April 2020 sampai dengan 8 Juli 2020.
Pelaksanaan transaksi pembelian kembali saham
Perusahaan akan dilaksanakan melalui BEl.
Perusahaan telah menunjuk PT Mandiri Sekuritas The Company has appointed PT Mandiri Sekuritas
untuk melakukan pembelian kembali saham to conduct the share buyback.
Perusahaan.
Pembelian kembali saham tersebut akan dilakukan The share buyback will be executed on the price
pada harga yang lebih rendah atau sama dengan of which is lower or as the closing price on
harga penutupan perdagangan sebelumnya. previous trading day.
Setelah pengumuman Perusahaan pada bulan Following the Company’s announcement in April
April 2020 mengenai rencananya untuk 2020 of its plan to do share buyback, the
melakukan pembelian kembali saham, Perusahaan Company has subsequently completed 7,500,000
telah menyelesaikan pembelian kembali sebanyak share buy back in July 2020, at the price ranging
7.500.000 lembar saham pada bulan Juli 2020, from Rp 680 to Rp 700 per share totaling to
dengan kisaran harga per lembar sebesar Rp 680 Rp 5,206,807,413 (equivalent to US$ 359,945)
– Rp 700 dan nilai transaksi sebesar (including tax and brokerage fees).
Rp 5.206.807.413 (setara dengan US$ 359.945)
(termasuk pajak dan biaya).
Jumlah saham treasuri pada tanggal Outstanding treasury shares as of September 30,
30 September 2024 sebanyak 7.500.000 lembar 2024 was 7,500,000 shares (December 31, 2023:
(31 Desember 2023: 7.500.000 lembar). 7,500,000 shares).
-8-
Page 13
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) (Lanjutan) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED) (Continued)
d. Entitas Anak d. Subsidiaries
Perusahaan secara langsung atau tidak langsung The Company has ownership interest, directly or
memiliki saham entitas anak berikut: indirectly, in the following subsidiaries:
Persentase Kepemilikan/ Tahun Operasi Jumlah Aset Sebelum Eliminasi/
Percentage of Ownership Komersial/ Total Assets Before Elimination
Nama Entitas/ Domisili/ Jenis Usaha/ 30 September/ 31 Desember/ Start of Commercial 30 September/ 31 Desember/
Name of Entities Domicile Nature of Business September 30, 2024 December 31, 2023 Operations September 30, 2024 December 31, 2023
US$ US$
PT Indika Inti Corpindo (IIC) dan entitas anak/ Jakarta/ Investasi dan perdagangan umum/ 99,99% 99,99% 1998 1.372.118.614 1.711.142.070
and subsidiaries Jakarta Investment and general trading
PT Citra Indah Prima (CIP) dan entitas anak/ Jakarta/ Investasi/ 99,92% 99,92% Dalam tahap likuidasi/ 99.141 99.141
and subsidiaries *) Jakarta Investment On liquidation process
Indika Capital Pte. Ltd. (ICPL) dan entitas anak/ Singapura/ Pemasaran dan investasi/ 99,99% 99,99% 2009 293.640.155 691.076.980
and subsidiary *) Singapore Marketing and investment
Indika Capital Resources Limited (ICRL) *) Kepulauan Virgin Britania/P embiayaan/ 99,99% 99,99% 2009 3.325.758 4.076.350
British Virgin Islands Financing
PT Kideco Jaya Agung (KJA) *) Jakarta/ Pertambangan/ 91,00% 91,00% 1982 662.497.153 675.565.209
Jakarta Mining
PT Indy Properti Indonesia (IPY) Jakarta/ Pembangunan, jasa dan perdagangan/ 100% 100% 2015 1.947.187 2.178.510
Jakarta Development, services and trading
PT Indika Indonesia Resources (IIR) dan entitas anak/ Jakarta/ Pertambangan dan perdagangan dasar/ 100% 100% 2009 273.262.850 351.706.174
and subsidiaries Jakarta Mining and trading
Indika Capital Investments Pte. Ltd (ICI) *) Singapura/ Perdagangan batubara dan mineral 100% 100% 2015 183.586.396 114.112.946
Singapore serta perdagangan umum/
Coal and mineral trading and general
trading activities
Indika Energy Trading Pte. Ltd. (IETPL) dan Singapura/ Perdagangan batubara dan mineral 60% 60% 2016 27.235.163 30.802.128
entitas anak/and subsidiary *) Singapore serta perdagangan umum/
Coal and mineral trading and general
trading activities
PT Indika Energi Trading (IET) *) Jakarta/ Perdagangan/ 100% 100% 2019 6.633.818 5.400.647
Jakarta Trading
PT Tripatra Multi Energi (TIME) dan entitas anak/ Jakarta/ Perdagangan, pembangunan, perindustrian, 100% 100% 2012 477.179.150 471.015.698
and subsidiaries Jakarta pertanian, percetakan, perbengkelan,
pengangkutan dan jasa/Trading,
development, industrial, agriculture, printing,
workshop, transportation and services
PT Tripatra Engineers and Constructors (TPEC) Jakarta/ Jasa konsultasi, konstruksi, bisnis, 100% 100% 1989 216.710.852 217.163.116
dan entitas anak/and subsidiaries Jakarta perdagangan dan industri/
Provision of consultancy services,
construction business and trading
-9-
Page 14
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) (Lanjutan) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED) (Continued)
Persentase Kepemilikan/ Tahun Operasi Jumlah Aset Sebelum Eliminasi/
Percentage of Ownership Komersial/ Total Assets Before Elimination
Nama Entitas/ Domisili/ Jenis Usaha/ 30 September/ 31 Desember/ Start of Commercial 30 September/ 31 Desember/
Name of Entities Domicile Nature of Business September 30, 2024 December 31, 2023 Operations September 30, 2024 December 31, 2023
Tripatra (Singapore) Pte. Ltd (TS) *) Singapura/ Investasi/ 100% 100% 2006 16.911.373 16.973.259
dan entitas anak/and subsidiary Singapore Investment
Tripatra Investment Limited (TRIL) *) Kepulauan Investasi/ 100% 100% 2007 15.806.426 15.722.452
Virgin Britania/ Investment
British Virgin
Islands
PT Tripatra Engineering (TPE) Jakarta/ Jasa konsultasi untuk bidang- 100% 100% 1971 34.447.312 41.686.662
Jakarta bidang konstruksi, industri dan
infrasruktur/
Consultation services for
construction, industry and
infrastructure
PT Indika Multi Energi Internasional (IMEI) Jakarta/ Perdagangan, pembangunan, 100% 100% 2023 152.993.238 149.925.699
dan entitas anak/and subsidiary *) Jakarta perindustrian, pertanian, percetakan,
perbengkelan, pengangkutan dan jasa/
Trading, development, industrial,
agriculture, printing,workshop, transportation
and services
PT Prasarana Energi Indonesia (PEI) Jakarta/ Perdagangan, pembangunan, 25% 25% 2023 152.994.069 149.924.318
dan entitas anak/and subsidiary **) Jakarta perindustrian, pertanian, percetakan,
perbengkelan, pengangkutan dan jasa/
Trading, development, industrial,
agriculture, printing,workshop, transportation
and services
PT Prasarana Energi Cirebon (PEC) *) Jakarta/ Perdagangan, pembangunan, 25% 25% 2023 152.631.186 149.552.689
Jakarta perindustrian, pertanian, percetakan,
perbengkelan, pengangkutan dan jasa/
Trading, development, industrial,
agriculture, printing,workshop, transportation
and services
Indika Power Investments Pte. Ltd. (IPI) Singapura/ Investasi/ 100% 100% 2006 61.078.247 59.701.636
Singapore Investment
PT Indika Infrastruktur Investindo (III) Jakarta/ Investasi/ 100% 100% 2007 20.436.169 20.002.457
Jakarta Investment
PT Indika Energy Infrastructure (IEI) Jakarta/ Perdagangan, pembangunan 100% 100% 2010 209.119.686 202.005.101
dan entitas anak/and subsidiaries Jakarta dan jasa/Trading, development
and services
PT Interport Mandiri Utama (IMU) Jakarta/ Jasa manajemen dan perdagangan/ 100% 100% 2020 198.689.244 197.015.954
dan entitas anak/and subsidiaries *) Jakarta Management services and trading
- 10 -
Page 15
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) (Lanjutan) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED) (Continued)
Persentase Kepemilikan/ Tahun Operasi Jumlah Aset Sebelum Eliminasi/
Percentage of Ownership Komersial/ Total Assets Before Elimination
Nama Entitas/ Domisili/ Jenis Usaha/ 30 September/ 31 Desember/ Start of Commercial 30 September/ 31 Desember/
Name of Entities Domicile Nature of Business September 30, 2024 December 31, 2023 Operations September 30, 2024 December 31, 2023
PT Indika Logistic & Support Services (ILSS) *) Jakarta/ Pengelolaan pelabuhan/ 100% 100% 2011 45.685.199 46.707.378
Jakarta Port operation
PT Interport Mandiri Abadi (IMA) Jakarta/ Perdagangan umum, jasa penyewaan dan leasing, 100% 100% 2020 92.602.774 98.703.444
dan entitas anak/and subsidiaries *) Jakarta jasa profesional, ilmiah dan teknis, perumahan, jasa
keuangan dan asuransi, serta aktivitas perusahaan induk/
General trading, rental services and leasing, professional,
scientist and technical services, real estate, finance
services and insurance, and holding company activities
PT Interport Patimban Agung Jakarta/ Konsultasi transportasi, konsultasi manajemen 50,02% 100% Tahap pengembangan/ 1.324.005 29.351
Jakarta lainnya, aktivitas kantor pusat dan perdagangan Development stage
besar atas dasar balas jasa atau kontrak/
providing consulting for transportation and
others management, head office activities and
trading based on fee or contract
PT Kariangau Gapura Terminal Energi (KGTE), Jakarta/ Jasa pengurusan transportasi, perdagangan 100% 100% 2020 92.574.456 98.679.720
Jakarta dan jasa lainnya/Transportation management
services, trading and other services
PT Jatim Gapura Terminal Energi (JGTE) Jakarta/ Pertambangan, penggalian, pengangkutan 100% 100% Tahap pengembangan/ 350.410 350.410
Jakarta dan pergudangan/ Mining, quarrying, transportation and Development stage
warehousing
PT Cotrans Asia (CTA) Kalimantan Timur/ Jasa pengangkutan batubara/ 55% 55% 2004 30.560.167 36.222.473
East Kalimantan Coal transportation and transshipment service
PT Indika Multi Niaga (IMN) Jakarta/ Jasa pengurusan transportasi, perdagangan 100% 100% 2019 1.706.414 2.125.823
dan entitas anak/and subsidiary *) Jakarta dan jasa lainnya/Transportation management
services, trading and other services
PT Mitra Baruna Nusantara (MBN) *) Jakarta/ Jasa bongkar muat/ Stevedoring services 100% 100% Tahap pengembangan/ 374.892 441.442
Jakarta Development stage
PT Elang Mas Andalan (EMA), sebelumnya/ Jakarta/ Jasa pengurusan transportasi/ 100% 100% Tahap pengembangan/ 13.896 14.224
previously PT Interport Praba Prasarana Jakarta Transportation management services Development stage
PT POSB Reksabumi Indonesia (PRI) Jakarta/ Jasa pengelolaan limbah/ 100% 100% 2016 370.111 704.717
Jakarta Waste management services
PT Pusat Sarana Baruna (PSB) Jakarta/ Manajemen pelabuhan khusus/ 100% 100% 2019 11.690.274 12.415.746
Jakarta Specific port management
- 11 -
Page 16
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) (Lanjutan) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED) (Continued)
- 12 -
Page 17
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) (Lanjutan) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED) (Continued)
- 13 -
Page 18
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) (Lanjutan) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED) (Continued)
Persentase Kepemilikan/ Tahun Operasi Jumlah Aset Sebelum Eliminasi/
Percentage of Ownership Komersial/ Total Assets Before Elimination
Nama Entitas/ Domisili/ Jenis Usaha/ 30 September/ 31 Desember/ Start of Commercial 30 September/ 31 Desember/
Name of Entities Domicile Nature of Business September 30, 2024 December 31, 2023 Operations September 30, 2024 December 31, 2023
US$ US$
Nusantara Resources Limited (Nusantara) dan entitas anak/ Australia/ Eksplorasi pertambangan dan mineral/ 100% 100% Tahap Pengembangan/ 258.177.185 203.375.569
and subsidiary Australia Mining and mineral exploration Development Stage
Salu Siwa Pty Limited (SSPL) Australia/ Investasi/Investment 100% 100% Tahap Pengembangan/ 6.375.000 6.375.000
Australia Development Stage
PT Masmindo Dwi Area (Masmindo) Sulawesi Selatan Pertambangan emas/ 100% 100% Tahap Pengembangan/ 243.609.275 188.757.148
South Sulawesi Gold mining Development Stage
PT Rockgeo Energi Nusantara (REN) Jakarta/ Pengangkutan dan penjualan komoditas 100% 100% 2021 2.374.863 5.201.628
Jakarta tambang mineral logam/
Transportation and selling of metal
mineral commodities
PT Perkasa Investama Mineral (PIM) Jakarta/ Perdagangan besar logam dan bijih logam, aktivitas 100% 100% 2022 18.629.199 16.973.925
dan entitas anak/and subsidiaries Jakarta konsultasi manajemen lainnya, perdagangan besar
bahan bakar padat, cair dan gas, perdagangan besar
atas dasar balas jasa (fee) atau kontrak/
General trading metal and metal ore, management
consultancy acvtivities, general trading of solid fuel,
liquid fuel and gas, trading based on fee or contract
PT Mekko Metal Mining (MMM) Jakarta/ Pertambangan bijih bauksit/ 100% 100% 2022 18.456.820 16.584.707
Jakarta Bauxite mining
PT Perkasa Alumina Indonesia (PAI) Jakarta/ Industri pembuatan logam dasar bukan besi/ 100% 100% Tahap Pengembangan/ 848.490 833.199
Jakarta Non- ferrous base metal manufacturing industry Development Stage
PT Solusi Mobilitas Indonesia (SMI) Jakarta/ Aktivitas profesional, ilmiah dan teknis, industry 100% 100% 2022 105.227.783 77.409.991
dan entitas anak/and subsidiaries Jakarta pengolahan, perdagangan besar dan eceran,
pengadaan listrik, gas, uap/ air panas dan udara dingin,
serta aktivitas penyewaan dan sewa guna usaha tanpa
hak opsi, ketenagakerjaan, agen perjalanan dan
penunjang usaha lainnya/
Professional, scientific and technical activities,
manufacturing industry, general trading and retail,
procurement of electricity, gas, steam/ hot water and air,
and lease without any option, labor, travel agent and
other support business
- 14 -
Page 19
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) (Lanjutan) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED) (Continued)
- 15 -
Page 20
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) (Lanjutan) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED) (Continued)
Persentase Kepemilikan/ Tahun Operasi Jumlah Aset Sebelum Eliminasi/
Percentage of Ownership Komersial/ Total Assets Before Elimination
Nama Entitas/ Domisili/ Jenis Usaha/ 30 September/ 31 Desember/ Start of Commercial 30 September/ 31 Desember/
Name of Entities Domicile Nature of Business September 30, 2024 December 31, 2023 Operations September 30, 2024 December 31, 2023
US$ US$
PT Foxconn Indika Motor (FIM) Jakarta/ Melakukan kegiatan manufaktur kendaraan bermotor 60% 60% Tahap Pengembangan/ 498.164 559.588
Jakarta roda empat atau lebih dan Melakukan kegiatan Development Stage
manufaktur batu baterai/
Conduct manufacturing business for four or more wheels
vehicle and Conduct manufacturing of battery .
PT Energi Makmur Buana Jakarta/ Industri pengolahan, pengadaan listrik, gas, uap/air 60% 60% 2015 28.742.238 8.119.084
Jakarta panas dan udara dingin, perdagangan besar dan
eceran, reparasi dan perawatan mobil dan sepeda motor,
pembangunan charger listrik dan pengadaan bus listrik/
Manufacturing industry, procurement of
electricity, gas, steam/hot water and cold
air, wholesale and retail trade, repair and
maintenance of cars and motorbikes,
construction of electric chargers and
procurement of electric buses.
PT Kalista Nusa Armada/ Jakarta/ (1) aktivitas penyewaan, ketenagakerjaan, agen 100% 100% 2023 32.488.813 10.794.142
dan entitas anak/and subsidiaries Jakarta perjalanan dan penunjang usaha lainnya; (2)
perdagangan, reparasi dan perawatan mobil dan sepeda
motor dan (3) pengadaan listrik, gas, uap/ air panas dan
udara dingin/
(1) leasing activities, labor, travel agent and other
supporting business activities; (2) trading, repair and
maintenance for vehicle and motorcycles and (3)
procurement of electricity, gas, steam/ hot water, and
cold air
PT Kalista Rotom Orbita (KRO) Jakarta/ (1) aktivitas penyewaan, ketenagakerjaan, agen 100% 100% 2023 26.992 4.565
Jakarta perjalanan dan penunjang usaha lainnya; (2)
perdagangan, reparasi dan perawatan mobil dan sepeda
motor dan (3) pengadaan listrik, gas, uap/ air panas dan
udara dingin/
(1) leasing activities, labor, travel agent and other
supporting business activities; (2) trading, repair and
maintenance for vehicle and motorcycles and (3)
procurement of electricity, gas, steam/ hot water, and
cold air
- 16 -
Page 21
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) (Lanjutan) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED) (Continued)
Persentase Kepemilikan/ Tahun Operasi Jumlah Aset Sebelum Eliminasi/
Percentage of Ownership Komersial/ Total Assets Before Elimination
Nama Entitas/ Domisili/ Jenis Usaha/ 30 September/ 31 Desember/ Start of Commercial 30 September/ 31 Desember/
Name of Entities Domicile Nature of Business September 30, 2024 December 31, 2023 Operations September 30, 2024 December 31, 2023
PT Kalista Soter Hastia (KSH) Jakarta/ (1) aktivitas penyewaan, ketenagakerjaan, agen 100% 100% 2024 16.357.754 10.574.708
Jakarta perjalanan dan penunjang usaha lainnya; (2)
perdagangan, reparasi dan perawatan mobil dan sepeda
motor dan (3) pengadaan listrik, gas, uap/ air panas dan
udara dingin/
(1) leasing activities, labor, travel agent and other
supporting business activities; (2) trading, repair and
maintenance for vehicle and motorcycles and (3)
procurement of electricity, gas, steam/ hot water, and
cold air
PT Kalista Nayara Dayautama Jakarta/ (1) aktivitas penyewaan, ketenagakerjaan, agen 100% 100% 2024 4.011.101 276.916
(KND) Jakarta perjalanan dan penunjang usaha lainnya; (2)
perdagangan, reparasi dan perawatan mobil dan sepeda
motor dan (3) pengadaan listrik, gas, uap/ air panas dan
udara dingin/
(1) leasing activities, labor, travel agent and other
supporting business activities; (2) trading, repair and
maintenance for vehicle and motorcycles and (3)
procurement of electricity, gas, steam/ hot water, and
cold air
PT Kalista Biru Nusantara Jakarta/ Aktivitas penyewaan dan sewa hak guna usaha tanpa 100% - 2024 17.280.407 -
(KBN) Jakarta hak opsi, ketenagakerjaan, agen perjalanan dan
penunjang usaha lainnya/
Rent and leasing activities without option rights, labor,
travel agent and other supporting business activities
PT Industri Baterai Nusantara (IBN) Jakarta/ (1) industri pengolahan mencakup pembuatan segala 100% 100% Tahap Pengembangan/ 417.133 -
dan entitas anak/and subsidiaries Jakarta macam baterai untuk kendaraan bermotor listrik; (2) Development Stage
aktivitas profesional, ilmiah dan teknis dan (3)
perdagangan, reparasi dan perawatan mobil dan sepeda
motor/
(1) manufacturing industry covering manufacturing of all
batteries for electric vehicles; (2) professional, scientific
and technical activities and (3) trading, repair and
maintenance for vehicle and motorcycles
- 17 -
Page 22
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) (Lanjutan) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED) (Continued)
*) Pemilikan tidak langsung *) Indirect ownership
**) Pada tanggal 1 Agustus 2016, IMEI dan IEI, entitas anak, telah menandatangani **) On August 1, 2016, IMEI and IEI, both subsidiaries, entered into Sales and
Akta Jual Beli Saham (AJB) dengan PT Imeco Multi Prasarana (I meco) – pihak Purchase Deed (SPD) with PT Imeco Multi Prasarana (Imeco), a related party,
berelasi, atas saham-saham milik IMEI dan IEI pada PEI, masing-masing sejumlah for 2,099 shares owned by IMEI and 1 share owned by IEI in PEI, which in total
2.099 dan 1 lembar saham, yang seluruhnya mewakili 75% saham di PEI. Setelah represents 75% of ownership in PEI. After the signing of the SPD, IMEI
penandatanganan AJB tersebut, IMEI memiliki 25% saham di PEI. Berdasarkan effectively retained 25% of share ownership in PEI. Based on the contractual
perjanjian kontrak antara IMEI dan Imeco, IMEI memiliki hak suara cukup dominan agreement between IMEI and Imeco, IMEI has sufficiently dominant voting
dan kuasa untuk menunjukkan dan memberhentikan dewan direksi dan dewan interests and the power to appoint and remove the majority of the board of
komisaris PEI yang memiliki pengaruh untuk mengelola dan men gawasi directors and board of commissioners of PEI that has the power to direct and
operasional PEI. Untuk kebijakan yang memerlukan persetujuan pemegang saham, supervise the relevant activities of PEI. For the actions that require Shareholders
setidaknya 80% hak suara diperlukan yang berarti IMEI juga harus menyetujui approval, the voting requirements is 80% meaning that IMEI should also
kebijakan tersebut. Oleh karena itu, IMEI memiliki kontrol atas PEI, meskipun approve the relevant actions. Therefore it was assessed that IMEI has control
secara hukum hanya memiliki 25% kepemilikan. over PEI, although it legally owns only 25% ownership interest.
***) BIG, ventura bersama yang didirikan oleh Perusahaan bersama-sama dengan ***) BIG, a joint venture between the Company and Bioneer Corporation Korea
Bioneer Corporation Korea pada tahun 2023, secara operasional masih dikelola established in 2023, is operationally directed by the Company in year 2023 and
oleh Perusahaan selama tahun 2023 dan 2024 sehingga terkonsolidasi oleh 2024 and therefore being consolidated to the Company.
Perusahaan.
- 18 -
Page 23
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
Tahun 2024 Year 2024
i. PT Natura Aromatik Nusantara (“NAN”) i. PT Natura Aromatik Nusantara (“NAN”)
Pada tanggal 27 Maret 2024, PT Indika Multi On March 27, 2024, PT Indika Multi Properti
Properti (“IMP”) dan PT Laras Ekosistem Organik ("IMP") and PT Laras Ekosistem Organik
(“Laras”), entitas anak Perusahaan, telah (“Laras”), the Company's subsidiaries, have
melaksanakan pengambilalihan saham tambahan conducted additional shares acquisition in PT
di PT Natura Aromatik Nusantara (“NAN”), entitas Natura Aromatik Nusantara ("NAN"), an associate
asosiasi (Catatan 15), dari para pemegang saham (Note 15), from the original shareholders, Novotel
awal, Novotel International Care Extracts Limited International Care Extracts Limited (“NICE”), PT
(“NICE”), PT Esensi Natura Nusantara (“ENN”), Esensi Natura Nusantara (“ENN”), Modiwati
Modiwati Karunia Mulia (“MKM”), Yohannes Karunia Mulia (“MKM”), Yohannes Setyawan
Setyawan (“YS”), dan Mafruhin Joko Nugroho (“YS”), and Mafruhin Joko Nugroho (“MJN”)
(“MJN”) (“Pengambilalihan Saham Tambahan”). (“Additional Shares Acquisition”). Prior to
Sebelum Pengambilalihan Saham Tambahan, IMP Additional Shares Acquisition, IMP hold 46.001%
memiliki 46,001% saham di NAN. shares in NAN.
Pengambilalihan Saham Tambahan dilakukan The Additional Shares Acquisition was conducted
dengan rincian sebagai berikut: with the following details:
• IMP melakukan pembelian saham NICE • IMP purchased NICE’s shares in the amount
sebesar 34,567% dengan nilai transaksi of 34.567% with the transaction value of
sebesar USD 8.130.378, berdasarkan Akta USD 8,130,378, based on Deed of Share
Pengalihan Saham No. 40 tanggal 27 Maret Transfer No. 40 dated March 27, 2024,
2024, dibuat dihadapan Notaris Ungke made before Notary Ungke Mulawanti, SH,
Mulawanti, SH, MKn; MKn;
• IMP melakukan pembelian saham ENN • IMP purchased ENN’s shares in the amount
sebesar 17,101% dengan nilai transaksi of 17.101% with the transaction value of Rp
sebesar Rp63.388.285.680 yang setara 63,388,285,680 as equivalent to USD
dengan USD 4.018.801, berdasarkan Akta 4,018,801, based on Deed of Share Transfer
Pengalihan Saham No. 41 tanggal 27 Maret No. 41 dated March 27, 2024, made before
2024, dibuat dihadapan Notaris Ungke Notary Ungke Mulawanti, SH, MKn;
Mulawanti, SH, MKn;
• IMP melakukan pembelian saham MKM • IMP purchased MKM’s shares in the amount
sebesar 0,863% dengan nilai transaksi of 0.863% with the transaction value of Rp
sebesar Rp 3.197.247.318 yang setara 3,197,247,318 as equivalent to USD
dengan USD 202.705, berdasarkan Akta 202,705, based on Deed of Share Transfer
Pengalihan Saham No. 42 tanggal 27 Maret No. 42 dated March 27, 2024, made before
2024, dibuat dihadapan Notaris Ungke Notary Ungke Mulawanti, SH, MKn;
Mulawanti, SH, MKn;
• IMP melakukan pembelian saham YS sebesar • IMP purchased YS’ shares in the amount of
0,791% dengan nilai transaksi sebesar Rp 0.791% with the transaction value of Rp
2.930.811.876 yang setara dengan US$ 2,930,811,876 as equivalent to US$
185.813, berdasarkan Akta Pengalihan 185,813, based on Deed of Share Transfer
Saham No. 43 tanggal 27 Maret 2024, dibuat No. 43 dated March 27, 2024, made before
dihadapan Notaris Ungke Mulawanti, SH, Notary Ungke Mulawanti, SH, MKn; and
MKn; dan
• Laras melakukan pembelian saham MJN • Laras purchased MJN’s shares in the amount
sebesar 0,647% dengan nilai transaksi of 0.647% with the transaction value of Rp
sebesar Rp 2.397.933.654 yang setara 2,397,933,654 as equivalent to USD
dengan USD 152.028, berdasarkan Akta 152,028, based on Deed of Share Transfer
Pengalihan Saham No. 44 tanggal 27 Maret No. 44 dated March 27, 2024, made before
2024, dibuat dihadapan Notaris Ungke Notary Ungke Mulawanti, SH, MKn.
Mulawanti, SH, MKn.
Sebelum pengendalian diperoleh, kepemilikan Prior to control being obtained, the 46%
46% atas NAN dicatat dengan menggunakan ownership interest in NAN was accounted for
metode ekuitas (Catatan 15). Sebagai bagian dari using the equity method (Note 15). As part of
akuntansi kombinasi bisnis, IMP mengukur accounting for the business combination, IMP
kembali kepemilikan sebelumnya pada nilai wajar remeasures any previously held interest at fair
dan menggunakan nilai tersebut untuk value and takes this amount into account in the
menentukan nilai goodwill. Nilai wajar atas determination of goodwill. The fair value of
kepemilikan sebelumnya didasarkan imbalan yang previously held interest was determined based on
- 19 -
Page 24
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
dialihkan atas pembelian 54% kepemilikan saham the consideration transferred for the purchase of
atas NAN. Keuntungan dan kerugian yang timbul the 54% ownership interest in NAN. Any resultant
diakui dalam laporan laba atau rugi. gain or loss is recognised in profit or loss.
Kerugian dari penilaian nilai wajar kepemilikan Loss on revaluation from fair value of IMP’s
sebelumnya atas NAN oleh IMP adalah sebagai previously held ownership interest in NAN is as
berikut: follows:
US$
Nilai wajar atas 46% kepemilikan saham 10.821.825 Fair value of the 46% ownership interest
yang sebelumnya dimiliki previously held
Dikurangi: nilai tercatat investasi NAN Less: carrying amount of investment in KJA
per 31 Maret 2024 (11.880.835) as of March 31, 2024
Kerugian yang diakui dalam
laba atau rugi (Catatan 45) (1.059.010) Loss recognized in profit or loss (Note 45)
Pada tanggal efektif akuisisi, IMP memiliki 100% On the effective date of the acquisition, IMP owns
kepemilikan saham NAN. 100% of NAN's ownership interest.
Pada saat tanggal akuisisi, inisial akuntansi dan As of the acquisition date, initial accounting and
penentuan nilai wajar aset bersih NAN yang determination of fair value of identifiable net
diakuisisi adalah sebagai berikut: assets acquired of NAN is as follows:
US$
Kas dan setara kas 75.887 Cash and cash equivalents
Piutang Usaha 4.918.881 Trade accounts receivables
Persediaan 5.392.851 Inventories
Aset lancar 750.943 Current assets
Aset tetap (Catatan 22) 4.730.572 Property, plant and equipment (Note 22)
Aset tidak berwujud (Catatan 24) 4.418.787 Intangible assets (Note 24)
Aset tidak berwujud lainnya (Catatan 24) 149.451 Other intangible assets (Note 24)
Aset tidak lancar 1.545.580 Noncurrent assets
Liabilitas pajak tangguhan (972.133) Deferred tax liabilities
Liabilitas lancar (879.262) Current liabilities
Liabilitas tidak lancar (272.578) Non-current liabilities
Aset bersih 19.858.979 Net assets
Goodwill atas akuisisi NAN ditentukan sebagai Goodwill from the acquisition of NAN is
berikut: determined as follows:
US$
Pembayaran Kas 12.703.881 Cash considerations paid
Nilai wajar 46% saham NAN yang Fair value 46% shares of NAN owned by IMP
dimiliki IMP 10.821.825
Jumlah 23.525.706 Total
Dikurangi : nilai wajar aset bersih yang Less: Fair value of the identifiable net assets
diakuisisi (19.858.979) acquired
Goodwill (Catatan 25) 3.666.727 Goodwill (Note 25)
Goodwill yang timbul dalam kombinasi bisnis Goodwill arose in the business combination
karena biaya perolehan kombinasi termasuk suatu because the cost of the combination included a
premi pengendalian. Selanjutnya, imbalan yang control premium. In addition, the consideration
dibayar untuk kombinasi secara efektif termasuk paid for the combination effectively included
jumlah yang terkait dengan sinergi yang amounts in relation to the benefit of expected
diharapkan, pertumbuhan pendapatan, synergies, revenue growth, future market
pengembangan pasar yang akan datang, development, assembled workforce and certain
kumpulan tenaga kerja dan aset tak berwujud intangible assets. These benefits are not
tertentu. Manfaat ini tidak diakui terpisah dari recognized separately from goodwill because they
goodwill karena manfaat tersebut tidak memenuhi do not meet the recognition criteria for identifiable
kriteria pengakuan untuk aset tak berwujud yang intangible assets.
dapat diidentifikasi.
- 20 -
Page 25
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
ii. PT Genomik Solidaritas Indonesia (“GSI”) ii. PT Genomik Solidaritas Indonesia (“GSI”)
Pada tanggal 14 Juni 2024, IMAN (entitas anak On June 14, 2024, IMAN (a subsidiary of the
Perusahaan) menandatangani beberapa Akta Company) entered into several Share Sale
Jual Beli Saham untuk mengakuisisi 68,6% and Purchase Deeds to acquire 68.6% share
saham di PT Genomik Solidaritas Indonesia ownership in PT Genomik Solidaritas
(GSI) dari beberapa pemegang saham GSI Indonesia (GSI) from several existing
dengan harga pembelian sebesar shareholders of GSI with total considerations
Rp18.738.110.485 atau setara dengan of Rp18,738,110,485 or equivalent to
US$1.150.566. Setelah tanggal efektif Akta, US$1,150,566. After the effective date of the
IMAN memiliki 68,6% saham di GSI, Deeds, IMAN owns 68.6% shares in GSI, while
sedangkan saham lainnya dimiliki oleh Yayasan the remaining shares are owned by Yayasan
Indika Untuk Indonesia, pihak berelasi. Indika Untuk Indonesia, a related company.
Akuisisi ini dicatat dengan menggunakan This acquisition was accounted for using the
metode pembelian berdasarkan nilai wajar aset purchase method based on the fair value of
bersih yang dapat diidentifikasi dari GSI, the identifiable net assets of GSI, based on its
berdasarkan laporan keuangan GSI tanggal 30 June 30, 2024 financial statements. As of the
Juni 2024. Pada tanggal akuisisi, akuntansi acquisition date, initial accounting and
awal dan penentuan nilai wajar aset bersih GSI determination of fair value of identifiable net
yang diakuisisi adalah sebagai berikut: assets acquired of GSI is as follows:
30 Juni/
June 30 2024
US$
Aset Assets
Kas dan setara kas 614.210 Cash and cash equivalents
Piutang Usaha 120.764 Trade accounts receivables
Pajak dibayar di muka 895.934 Prepaid taxes
Persediaan 320.324 Inventories
Aset lancar lainnya 223.945 Other current assets
Aset tetap (Catatan 22) 3.620.293 Property, plant dan equipment (Note 22)
Aset tidak berwujud (Catatan 24) 11.804 Intangible assets (Note 24)
Aset pajak tangguhan 328.779 Deferred tax assets
Liabilitas Liabilities
Utang usaha 530.514 Trade payable
Utang pajak 50.958 Tax payable
Liabilitas lancar lainnya 449.878 Other current liabilities
Aset bersih 5.104.703 Net assets
Akuisisi mengakui keuntungan pembelian The acquisition results in gain from a bargain
dengan diskon sebesar Rp US$ 2.351.718, purchase of US$ 2,351,718, consisted of (1)
terdiri dari (1) imbalan yang dialihkan sebesar consideration transferred amounted
US$ 1.150.566; (2) kepentingan non- US$ 1,150,566; (2) noncontrolling interest
pengendali sebesar US$ 1.602.419; dan (3) amounted to US$ 1,602,419; and (3) fair
nilai wajar aset bersih teridentifikasi yang value of identifiable net assets acquired
diperoleh sebesar US$ 5.104.703. amounted US$ 5,104,703.
Arus kas keluar sehubungan dengan akuisisi Net cash outflow on the acquisition amounted
adalah sebesar: to:
US$
Arus kas keluar bersih 1.150.566 Net cash outflow on the acquisition
Kas dan setara kas diperoleh 614.210 Cash and cash equivalent acquired
Net (536.356) Bersih
- 21 -
Page 26
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
iii. PT Interport Patimban Agung (“IPA”) iii. PT Interport Patimban Agung (“IPA”)
Pada tanggal 28 Juni 2024, PT Interport On June 28, 2024, PT Interport Patimban
Patimban Agung (IPA, entitas anak tidak Agung (IPA, an indirectly fully owned
langsung yang sepenuhnya dimiliki) subsidiary) issued additional 120 new shares
menerbitkan 120 lembar saham Seri B dengan of Series B at a par value of
nilai nominal sebesar Rp23.700.000.000 dan Rp23,700,000,000 and were fully subscribed
telah dipesan oleh PT Infura Sejahtera Abadi by PT Infura Sejahtera Abadi (ISA). After the
(ISA). Setelah penempatan, ISA memiliki subscription, ISA owns 48.98% share
48,98% saham IPA sementara sisanya dimiliki ownership in IPA while the rest is owned by
oleh IMU dan ILSS. IMU and ILSS.
Selisih antara hasil penerbitan saham dan The difference between proceed from shares
investasi sebesar US$837.613 dan dicatat subscription and carrying investment was
sebagai bagian dari ekuitas lain-lain. US$837,613 and recorded as part of other
equity.
iv. PT Kalista Biru Nusantara (“KBN”) iv. PT Kalista Biru Nusantara (“KBN”)
KSH bersama dengan KALISTA, entitas anak KSH together with KALISTA, subsidiaries of
Perusahaan, mendirikan entitas anak baru, the Company, established a new subsidiary
yaitu PT Kalista Biru Nusantara (“KBN”), namely PT Kalista Biru Nusantara (“KBN”) as
sebagaimana dinyatakan dalam Akta No. 81 evidenced by Deed No. 81 dated July 24, 2024
tertanggal 24 Juli 2024 yang dibuat di hadapan made before Ungke Mulawanti, S.H., M.Kn.,
Ungke Mulawanti, S.H., M.Kn., Notaris di Notary in Bekasi, and approved by the
Bekasi, dan telah disetujui oleh Menteri Hukum Ministry of Laws and Human Rights through its
dan Hak Asasi Manusia melalui Keputusan No. Decree AHU-0058368.AH.01.01.TAHUN 2024
AHU-0058368.AH.01.01.TAHUN 2024 dated August 2, 2024.
tertanggal 2 Agustus 2024.
Modal dasar KBN adalah Rp 25.000.000.000, The authorized capital in KBN is
sementara modal ditempatkan dan disetor Rp 25,000,000,000 while the issued and paid-
adalah Rp 6.250.000.000, yang terbagi atas up capital is Rp 6,250,000,000 which are
6.250 saham di mana sejumlah 6.249 saham issued through 6,250 shares where 6,249
dengan nilai sebesar Rp 6.249.000.000 dimiliki shares amounting to Rp 6,249,000,000 are
oleh KSH dan 1 saham dengan nilai sebesar Rp owned by KSH and 1 share amounting to
1.000.000 dimiliki oleh KALISTA. Rp 1,000,000 is owned by KALISTA.
Maksud dan tujuan KBN adalah berusaha The goals and objective of KBN is to do
dalam bidang aktivitas penyewaan dan sewa business in the field of rental and leasing
guna usaha tanpa hak opsi, ketenagakerjaan, activities without option rights, labor, travel
agen perjalanan dan penunjang usaha lainnya. agents and other supporting business
Untuk mencapai maksud dan tujuan tersebut, activities. To achieve these goals and
KBN menjalankan usaha aktivitas penyewaan objectives, KBN engages in the rental and
dan sewa guna usaha tanpa hak opsi alat leasing activities without option rights for land
transportasi darat bukan kendaraan bermotor transportation other than four-wheeled or
roda empat atau lebih. more motor vehicles.
Tahun 2023 Year 2023
Pendirian entitas anak Establishment of subsidiaries
i. PT Indika Bioneer Group (“BIG”) i. PT Indika Bioneer Group (“BIG”)
Pada tanggal 11 Januari 2023, entitas anak On January 11, 2023, the Company’s
Perusahaan, yang secara langsung maupun subsidiary, which is 100% directly and
tidak langsung dimiliki 100% oleh Perusahaan, indirectly owned by the Company, namely
yaitu PT Indika Medika Nusantara (“IMAN”), PT Indika Medika Nusantara (“IMAN”), has
telah mendirikan perusahaan patungan (joint established a joint venture company with
venture) dengan Bioneer Corporation yang Bioneer Corporation namely PT Bioneer Indika
bernama PT Indika Bioneer Group (“BIG”). Group (“BIG”). IMAN and Bioneer Corporation
IMAN dan Bioneer Corporation masing-masing each has 50% share ownership in BIG.
memiliki 50% saham di BIG. Pendirian BIG Establishment of BIG had been stated through
dinyatakan dalam Akta Pendirian No. 24 Deed of Establishment No. 24 dated January 11,
- 22 -
Page 27
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
tertanggal 11 Januari 2023 yang dibuat di 2023 which was made before Ungke
hadapan Ungke Mulawanti, S.H., M.Kn., Notaris Mulawanti, S.H., M.Kn., Notary in Bekasi, and
di Bekasi dan telah mendapat pengesahan ratified by the Ministry of Law and Human
sebagai badan hukum oleh Menteri Hukum dan Rights of Republic of Indonesia through
Hak Asasi Manusia Republik melalui Surat Decree No. AHU-0002375.AH.01.01.TAHUN
Keputusan No. AHU-0002375.AH.01.01.TAHUN 2023 dated January 11, 2023.
2023 tanggal 11 Januari 2023.
BIG berusaha dalam bidang aktivitas BIG will conduct business related to
profesional, ilmiah dan teknis, yaitu usaha jasa professional, science and technical activities,
konsultasi manajemen lainnya, khususnya di namely other management consulting
bidang kesehatan. services, specifically in health sector.
Partisipasi IMAN dalam BIG merupakan IMAN’s participation in BIG is the Group’s step
langkah Grup untuk memperluas dan to expand and diversify its business activities
mendiversifikasi kegiatan usahanya ke bidang to health sector in Indonesia.
kesehatan di Indonesia.
ii. PT Indika Bioneer Diagnostika (“BID”) ii. PT Indika Bioneer Diagnostika (“BID”)
Pada tanggal 25 Januari 2023, BIG dan IMAN On January 25, 2023, BIG and IMAN have
telah mendirikan perusahaan baru yang established a new company namely
bernama PT Indika Bioneer Diagnostika PT Bioneer Indika Diagnostika (“BID”), with a
(“BID”), dengan jumlah modal ditempatkan total paid-up capital of Rp 31,494,000,000 or
sebesar Rp 31.494.000.000 atau setara equivalent to US$ 2,002,034 where BIG owned
dengan US$ 2.002.034 dimana BIG memiliki 99.97% ownership in BID. Establishment of
99,97% kepemilikan saham di BID. Pendirian BID had been stated through Deed of
BID dinyatakan dalam Akta Pendirian No. 35 Establishment No. 35 dated January 19, 2023
tertanggal 19 Januari 2023 yang dibuat di which was made before Ungke Mulawanti,
hadapan Ungke Mulawanti, S.H., M.Kn., S.H., M.Kn., Notary in Bekasi, and ratified by
Notaris di Bekasi dan telah mendapat the Ministry of Law and Human Rights of
pengesahan sebagai badan hukum oleh Republic of Indonesia through Decree No.
Menteri Hukum dan Hak Asasi Manusia AHU-0005905.AH.01.01.TAHUN 2023 dated
Republik melalui Surat Keputusan January 25, 2023.
No. AHU-0005905.AH.01.01.TAHUN 2023
tanggal 25 Januari 2023.
BID akan menjalankan kegiatan usaha di BID will conduct business in distribution of
bidang distribusi alat kesehatan. medical equipment.
Pendirian BID oleh BIG dan IMAN merupakan Establishment of BID by BIG and IMAN is the
langkah Grup untuk melakukan ekspansi dan Group’s step to expand and diversify its
diversifikasi usaha ke sektor kesehatan di business activities to health sector in
Indonesia. Indonesia.
iii. PT Kalista Nusa Armada (“KALISTA”) iii. PT Kalista Nusa Armada (“KALISTA”)
SMI bersama dengan IEI, entitas anak SMI together with IEI, subsidiaries of the
Perusahaan, mendirikan entitas anak baru, Company, established a new subsidiary
yaitu PT Kalista Nusa Armada (“KALISTA”), namely PT Kalista Nusa Armada (“KALISTA”)
sebagaimana dinyatakan dalam Akta No. 20 as evidenced by Deed No. 20 dated May 11,
tertanggal 11 Mei 2023 yang dibuat di hadapan 2023 made before Ungke Mulawanti, S.H.,
Ungke Mulawanti, S.H., M.Kn., Notaris di M.Kn., Notary in Bekasi, and approved by the
Bekasi, dan telah disetujui oleh Menteri Hukum Ministry of Laws and Human Rights through its
dan Hak Asasi Manusia melalui keputusan Decree AHU-0034393.AH.01.01.TAHUN 2023
No. AHU-0034393.AH.01.01.TAHUN 2023 dated May 12, 2023.
tertanggal 12 Mei 2023.
Modal dasar KALISTA adalah The authorized capital in KALISTA is
Rp 64.000.000.000, sementara modal Rp 64,000,000,000 while the issued and paid-
ditempatkan dan disetor adalah up capital is Rp 16,000,000,000 or equivalent
Rp 16.000.000.000 atau setara dengan to US$ 1,086,809 which are issued through
US$ 1.086.809, yang terbagi atas 16.000 16,000 shares where 15,999 shares
saham di mana sejumlah 15.999 saham amounting to Rp 15,999,000,000 are owned
dengan nilai sebesar Rp 15.999.000.000
- 23 -
Page 28
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
dimiliki oleh SMI dan 1 saham dengan nilai by SMI and 1 share amounting to
sebesar Rp 1.000.000 dimiliki oleh IEI. Rp 1,000,000 is owned by IEI.
KALISTA menjalankan kegiatan usaha KALISTA engages in (1) leasing activities,
(1) aktivitas penyewaan, ketenagakerjaan, labor, travel agent and other supporting
agen perjalanan dan penunjang usaha lainnya; business activities; (2) trading, repair and
(2) perdagangan, reparasi dan perawatan maintenance for vehicle and motorcycles and
mobil dan sepeda motor dan (3) pengadaan (3) procurement of electricity, gas, steam/ hot
listrik, gas, uap/ air panas dan udara dingin. water, and cold air.
iv. PT Kalista Rotom Orbita (“KRO”) iv. PT Kalista Rotom Orbita (“KRO”)
KALISTA bersama dengan SMI, entitas anak KALISTA together SMI, subsidiaries of the
Perusahaan, mendirikan entitas anak baru, Company, established a new subsidiary
yaitu PT Kalista Rotom Orbita (“KRO”), namely PT Kalista Rotom Orbita (“KRO”) as
sebagaimana dinyatakan dalam Akta No. 10 evidenced by Deed No. 10 dated July 7, 2023
tertanggal 7 Juli 2023 yang dibuat di hadapan made before Ungke Mulawanti, S.H., M.Kn.,
Ungke Mulawanti, S.H., M.Kn., Notaris di Notary in Bekasi, and approved by the
Bekasi, dan telah disetujui oleh Menteri Hukum Ministry of Laws and Human Rights through its
dan Hak Asasi Manusia melalui keputusan Decree No. AHU-0051236.AH.01.01 dated
No. AHU-0051236.AH.01.01 tertanggal 14 Juli July 14, 2023.
2023.
Modal dasar KRO adalah Rp 60.000.000.000, The authorized capital in KRO is
sementara modal ditempatkan dan disetor Rp 60,000,000,000 while the issued and paid-
adalah Rp 16.000.000.000 atau setara dengan up capital is Rp 16,000,000,000 or equivalent
US$ 1.068.233, yang terbagi atas 16.000 to US$ 1,068,233 which are issued through
saham di mana sejumlah 15.999 saham 16,000 shares where 15,999 shares
dengan nilai sebesar Rp15.999.000.000 amounting to Rp 15,999,000,000 are owned
dimiliki oleh KALISTA dan 1 saham dengan nilai by KALISTA and 1 share amounting to
sebesar Rp1.000.000 dimiliki oleh SMI. Rp 1,000,000 is owned by SMI.
KRO menjalankan kegiatan usaha (1) aktivitas KRO engages in (1) leasing activities, labor,
penyewaan, ketenagakerjaan, agen perjalanan travel agent and other supporting business
dan penunjang usaha lainnya; activities; (2) trading, repair and maintenance
(2) perdagangan, reparasi dan perawatan for vehicle and motorcycles and
mobil dan sepeda motor dan (3) pengadaan (3) procurement of electricity, gas, steam/ hot
listrik, gas, uap/ air panas dan udara dingin. water, and cold air.
v. PT Kalista Soter Hastia (“KSH”) v. PT Kalista Soter Hastia (“KSH”)
KALISTA bersama dengan SMI, entitas anak KALISTA together with SMI, subsidiaries of
Perusahaan, mendirikan entitas anak baru, the Company, established a new subsidiary
yaitu PT Kalista Soter Hastia (“KSH”), namely PT Kalista Soter Hastia (“KSH”) as
sebagaimana dinyatakan dalam Akta No. 11 evidenced by Deed No. 11 dated July 7, 2023
tertanggal 7 Juli 2023 yang dibuat di hadapan made before Ungke Mulawanti, S.H., M.Kn.,
Ungke Mulawanti, S.H., M.Kn., Notaris di Notary in Bekasi, and approved by the
Bekasi, dan telah disetujui oleh Menteri Hukum Ministry of Laws and Human Rights through its
dan Hak Asasi Manusia melalui keputusan Decree No. AHU-0051240.AH.01.01 dated
No. AHU-0051240.AH.01.01 tertanggal 14 Juli July 14, 2023.
2023.
Modal dasar KSH adalah Rp 150.000.000.000, The authorized capital in KSH is
sementara modal ditempatkan dan disetor Rp 150,000,000,000 while the issued and
adalah Rp 37.500.000.000 atau setara dengan paid-up capital is Rp 37,500,000,000
US$ 2.503.672, yang terbagi atas 37.500 or equivalent to US$ 2,503,672 which are
saham di mana sejumlah 37.499 saham issued through 37,500 shares where 37,499
dengan nilai sebesar Rp 37.499.000.000 shares amounting to Rp 37,499,000,000 are
dimiliki oleh KALISTA dan 1 saham dengan nilai owned by KALISTA and 1 share amounting to
sebesar Rp1.000.000 dimiliki oleh SMI. Rp 1,000,000 is owned by SMI.
KSH menjalankan kegiatan usaha (1) aktivitas KSH engages in (1) leasing activities, labor,
penyewaan, ketenagakerjaan, agen perjalanan travel agent and other supporting business
dan penunjang usaha lainnya; activities; (2) trading, repair and maintenance
(2) perdagangan, reparasi dan perawatan for vehicle and motorcycles and
- 24 -
Page 29
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
mobil dan sepeda motor dan (3) pengadaan (3) procurement of electricity, gas, steam/ hot
listrik, gas, uap/ air panas dan udara dingin. water, and cold air.
vi. PT Kalista Nayara Dayautama (“KND”) vi. PT Kalista Nayara Dayautama (“KND”)
KALISTA bersama dengan SMI, entitas anak KALISTA together with SMI, subsidiaries of
Perusahaan, mendirikan entitas anak baru, the Company, established a new subsidiary
yaitu PT Kalista Nayara Dayautama (“KND”), namely PT Kalista Nayara Dayautama
sebagaimana dinyatakan dalam Akta No. 37 (“KND”) as evidenced by Deed
tertanggal 21 September 2023 yang dibuat di No. 37 dated September 21, 2023 made
hadapan Ungke Mulawanti, S.H., M.Kn., Notaris before Ungke Mulawanti, S.H., M.Kn., Notary
di Bekasi, dan telah disetujui oleh Menteri in Bekasi, and approved by the Ministry of
Hukum dan Hak Asasi Manusia melalui Laws and Human Rights through its Decree
keputusan No. AHU-0071928.AH.01.01.TAHUN No. AHU-0071928.AH.01.01.TAHUN 2023
2023 tertanggal 22 September 2023. dated September 22, 2023.
Modal dasar KND adalah Rp 240.000.000.000, The authorized capital in KND is
sementara modal ditempatkan dan disetor Rp 240,000,000,000 while the issued and
adalah Rp 60.000.000.000 atau setara dengan paid-up capital is Rp 60,000,000,000 or
US$ 3,896,863, yang terbagi atas 60.000 equivalent to US$ 3,896,863 which are issued
saham di mana sejumlah 59.999 saham through 60,000 shares where 59,999 shares
dengan nilai sebesar Rp 59.999.000.000 amounting to Rp 59,999,000,000 are owned
dimiliki oleh KALISTA dan 1 saham dengan nilai by KALISTA and 1 share amounting to
sebesar Rp 1.000.000 dimiliki oleh SMI. Rp 1,000,000 is owned by SMI.
KND menjalankan kegiatan usaha (1) aktivitas KND engages in (1) leasing activities, labor,
penyewaan, ketenagakerjaan, agen perjalanan travel agent and other supporting business
dan penunjang usaha lainnya; activities; (2) trading, repair and maintenance
(2) perdagangan, reparasi dan perawatan for vehicle and motorcycles and
mobil dan sepeda motor dan (3) pengadaan (3) procurement of electricity, gas, steam/ hot
listrik, gas, uap/ air panas dan udara dingin. water, and cold air.
vii. PT Industri Baterai Nusantara (“IBN”) vii. PT Industri Baterai Nusantara (“IBN”)
SMI bersama dengan IEI, entitas anak SMI together with IEI, subsidiaries of the
Perusahaan, mendirikan entitas anak baru, Company, established a new subsidiary
yaitu PT Industri Baterai Nusantara (“IBN”), namely PT Industri Baterai Nusantara
sebagaimana dinyatakan dalam Akta No. 40 (“IBN”) as evidenced by Deed
tertanggal 22 September 2023 yang dibuat di No. 40 dated September 22, 2023 made
hadapan Ungke Mulawanti, S.H., M.Kn., Notaris before Ungke Mulawanti, S.H., M.Kn., Notary
di Bekasi, dan telah disetujui oleh Menteri in Bekasi, and approved by the Ministry of
Hukum dan Hak Asasi Manusia melalui Laws and Human Rights through its Decree
keputusan No. AHU-0071936.AH.01.01.TAHUN No. AHU-0071936.AH.01.01.TAHUN 2023
2023 tertanggal 22 September 2023. dated September 22, 2023.
Modal dasar IBN adalah Rp 180.000.000.000, The authorized capital in IBN is
sementara modal ditempatkan dan disetor Rp 180,000,000,000 while the issued and paid-
adalah Rp 45.000.000.000 atau setara dengan up capital is Rp 45,000,000,000 or equivalent
US$ 2.922.647, yang terbagi atas 45.000 to US$ 2,922,647 which are issued through
saham di mana sejumlah 44.999 saham 45,000 shares where 44,999 shares
dengan nilai sebesar Rp 44.999.000.000 amounting to Rp 44,999,000,000 are owned
dimiliki oleh SMI dan 1 saham dengan nilai by SMI and 1 share amounting to
sebesar Rp 1.000.000 dimiliki oleh IEI. Rp 1,000,000 is owned by IEI.
IBN menjalankan kegiatan usaha (1) industri IBN engages in (1) manufacturing industry
pengolahan mencakup pembuatan segala covering manufacturing of all batteries for
macam baterai untuk kendaraan bermotor electric vehicles; (2) professional, scientific
listrik; (2) aktivitas profesional, ilmiah dan and technical activities and (3) trading, repair
teknis dan (3) perdagangan, reparasi dan and maintenance for vehicle and motorcycles.
perawatan mobil dan sepeda motor.
- 25 -
Page 30
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
viii. PT Manufaktur Teknologi Baterai (“MTB”) viii. PT Manufaktur Teknologi Baterai (“MTB”)
IBN bersama dengan SMI, entitas anak IBN together with SMI, subsidiaries of the
Perusahaan, mendirikan entitas anak baru, Company, established a new subsidiary
yaitu PT Manufaktur Teknologi Baterai (“MTB”), namely PT Manufaktur Teknologi Baterai
sebagaimana dinyatakan dalam Akta No. 41 (“MTB”) as evidenced by Deed No. 41 dated
tertanggal 25 September 2023 yang dibuat di September 25, 2023 made before Ungke
hadapan Ungke Mulawanti, S.H., M.Kn., Notaris Mulawanti, S.H., M.Kn., Notary in Bekasi,
di Bekasi, dan telah disetujui oleh Menteri and approved by the Ministry of Laws and
Hukum dan Hak Asasi Manusia melalui Human Rights through its Decree
keputusan No. AHU-0072469.AH.01.01.TAHUN No. AHU-0072469.AH.01.01.TAHUN 2023
2023 tertanggal 25 September 2023. dated September 25, 2023.
Modal dasar MTB adalah Rp 180.000.000.000, The authorized capital in MTB is
sementara modal ditempatkan dan disetor Rp 180,000,000,000 while the issued and paid-
adalah Rp 45.000.000.000 atau setara dengan up capital is Rp 45,000,000,000 or equivalent
US$ 2.925.307, yang terbagi atas 45.000 to US$ 2,925,307 which are issued through
saham di mana sejumlah 44.999 saham 45,000 shares where 44,999 shares
dengan nilai sebesar Rp 44.999.000.000 amounting to Rp 44,999,000,000 are owned
dimiliki oleh IBN dan 1 saham dengan nilai by IBN and 1 share amounting to
sebesar Rp 1.000.000 dimiliki oleh SMI. Rp 1,000,000 is owned by SMI.
MTB menjalankan usaha industri baterai untuk MTB engages in running battery industry for
kendaraan bermotor listrik, mencakup electric vehicles, including manufacturing of
pembuatan segala macam baterai untuk all batteries for electric vehicles.
kendaraan bermotor listrik.
ix. PT Laras Ekosistem Organik (“Laras”) x. PT Laras Ekosistem Organik (“Laras”)
Pada tanggal 2 November 2023, PT Indika Multi On November 2, 2023, PT Indika Multi
Properti dan PT Indika Inti Corpindo Properti and PT Indika Inti Corpindo have
mendirikan perusahaan bernama PT Laras established a company namely PT Laras
Ekosistem Organik (PT Laras). Ekosistem Organik (PT Laras).
Pendirian PT Laras dinyatakan dalam Akta Establishment of PT Laras had been stated
Pendirian No. 05 tertanggal 1 November 2023 through Deed of Establishment No. 05 dated
yang dibuat di hadapan Ungke Mulawanti, S.H., November 1, 2023 which was made before
M.Kn., Notaris di Bekasi dan telah mendapat Ungke Mulawanti, SH., M. Kn., Notary in
pengesahan sebagai badan hukum oleh Bekasi, and ratified by the Ministry of
Menteri Hukum dan Hak Asasi Manusia Law and Human Rights of Republic
Republik melalui Surat Keputusan of Indonesia through Decree
No. AHU 0083552.AH.01.01.TAHUN 2023 No. AHU 0083552.AH.01.01.TAHUN 2023
tanggal 2 November 2023. IMP memiliki dated November 2, 2023. IMP holds 99.99%
99,99% dari saham PT Laras atau setara of shares in PT Laras or equivalent to
dengan Rp 14.999.999.000 dan IIC memiliki Rp 14,999,999,000 and IIC holds 0.01%
0,01% saham PT Laras atau setara dengan shares of PT Laras or equivalent to
Rp 1.000.000. Rp 1,000,000.
PT Laras menjalankan aktivitas usaha untuk PT Laras will conduct business activities for
aktivitas konsultasi manajemen lainnya dan other management consultation activities,
perdagangan kopi, teh dan coklat. coffee, tea and cacao trading.
e. Entitas anak dijaminkan terhadap obligasi e. Subsidiaries collateralized to bonds and loan
dan fasilitas pinjaman facilities
Kepemilikan langsung dan tidak langsung The Company’s direct and indirect ownership in
Perusahaan di IIC, TPE, TPEC, TS, IECPL III, IECPL IIC, TPE, TPEC, TS, IECPL III, IECPL IV and KJA
IV dan KJA dijadikan jaminan dengan hak prioritas were used as security for the bonds payable on
utama atas utang obligasi (Catatan 34) yang first priority basis (Note 34), which was shared
dijaminkan pari passu dengan pinjaman sindikasi pari passu with the Company’s syndicated loans
Perusahaan (Catatan 31 dan 54). (Notes 31 and 54).
Kepemilikan saham di IPI dijadikan jaminan atas The share ownership in IPI was used as collateral
fasilitas pinjaman yang diperoleh pihak berelasi in relation to a related party’s loan facility
(Catatan 54). (Note 54).
- 26 -
Page 31
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
Kepemilikan tidak langsung Perusahaan di CEPR The Company’s indirect ownership in CEPR was
dijadikan jaminan kepada PT Bank Mizuho pledged with PT Bank Mizuho Indonesia
Indonesia (Catatan 54). (Note 54).
f. Restrukturisasi entitas sepengendali f. Restructuring under common control
Grup menyelesaikan beberapa transaksi entitas The Group finalized several common control
sepengendali guna mengintegrasikan dan transactions to be able to integrate and optimize
mengoptimalisasi layanan terhadap klien dan services to clients and to support business
guna mendukung pengembangan bisnis: development:
Tahun 2023 Year 2023
Pada tanggal 13 Februari 2023, PT Interport On February 13, 2023, PT Interport Mandiri Utama
Mandiri Utama (“IMU”) menandatangani (“IMU”) signed Share Sales and Purchase
Perjanjian Jual Beli Saham sehubungan dengan Agreement relating to shares in PT Cotrans Asia
saham dalam PT Cotrans Asia (“CTA”) dengan (“CTA”) with PT Tripatra Engineers and
PT Tripatra Engineers and Constructors (“TPEC”), Constructors (“TPEC”), wherein TPEC agreed to
dimana TPEC sepakat untuk menjual 1.800 lembar sell its 1,800 shares (representing 45% of
saham (mewakili 45% kepemilikan) dalam CTA ownership) in CTA to IMU and IMU agreed to
kepada IMU dan IMU bersedia membeli saham purchase the shares at the transaction price of
tersebut dengan harga transaksi sebesar Rp 31,950,000,000 or equivalent to US$ 2,113,095.
Rp 31.950.000.000 atau setara dengan
US$ 2.113.095.
Pada tanggal 13 Februari 2023, PT Interport On February 13, 2023, PT Interport Mandiri
Mandiri Utama (“IMU”) menandatangani Utama (“IMU”) signed Share Sales and Purchase
Perjanjian Jual Beli Saham sehubungan dengan Agreement relating to shares in CTA with
saham dalam CTA dengan PT Kalimantan Citra PT Kalimantan Citra Bara (“KCB”), wherein KCB
Bara (“KCB”), dimana KCB sepakat untuk menjual agreed to sell its 392 shares (representing 9.8%
392 lembar saham (mewakili 9,8% kepemilikan) of ownership) in CTA to IMU and IMU agreed to
dalam CTA kepada IMU dan IMU bersedia membeli purchase the shares at the transaction price of
saham tersebut dengan harga transaksi sebesar Rp 6,958,000,000 or equivalent to US$ 460,185.
Rp 6.958.000.000 atau setara dengan
US$ 460.185.
Tahun 2022 Year 2022
PT Electra Mobilitas Indonesia (“EMI”) PT Electra Mobilitas Indonesia (“EMI”)
Pada tanggal 4 Juli 2022, Perusahaan On July 4, 2022, the Company entered into
menandatangani Perjanjian Jual Beli Saham Share Sales and Purchase Agreement with
dengan PT Ilectra Motor Group (entitas anak) PT Ilectra Motor Group (a subsidiary) (“IMG”)
(“IMG”), dimana Perusahaan setuju untuk wherein (1) the Company agreed to sell its
mengalihkan 39.999 lembar saham miliknya di 39,999 shares in EMI to IMG at a selling price of
EMI kepada IMG dengan harga jual sebesar Rp 40.5 billion or equivalent to US$ 2,574,534
Rp 40,5 miliar or equivalent to US$ 2.574.534 dan and (2) IMG agreed to reimburse advance for
(2) IMG setuju untuk mengembalikan uang muka share capital of Rp 10 billion, which was injected
modal sebesar Rp 10 miliar, yang telah disetorkan by the Company in EMI.
oleh Perusahaan di EMI.
Perjanjian Jual Beli Saham diaktakan dalam akta Such Share Sales and Purchase Agreement was
No. 3 tanggal 4 Juli 2022 dari Ungke Mulawanti, notarized under deed No. 3 dated July 4, 2022, of
S.H., M.Kn., notaris publik di Bekasi. Ungke Mulawanti, S.H., M.Kn., notary public in
Bekasi.
g. Pembelian saham non-pengendali entitas g. Purchase of shares from non-controlling
anak interest of subsidiary
Pada tanggal 15 September 2017, IIR dan IETPL, On September 15, 2017, IIR and IETPL, both
entitas anak, telah menandatangani Perjanjian subsidiaries, entered into Sales and Purchase
Jual Beli Saham (PJB) dengan PT Mitra Paramarta Agreement (SPA) with PT Mitra Paramarta Prima
Prima (“MPP”), pihak non-pengendali, atas (“MPP”) as non-controlling interest, for 300
saham-saham milik MPP pada IET, masing-masing shares and 900 shares owned by MPP in IET,
- 27 -
Page 32
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
sejumlah 300 dan 900 lembar saham, yang respectively, which in total represents 40% of
seluruhnya mewakili 40% saham di IET. ownership in IET.
Pada tanggal yang sama, ICI sebagai pemilik 60% On the same date, ICI, with 60% ownership in
saham di IET, menandatangani Perjanjian Jual Beli IET, entered into Sales and Purchase Agreement
Saham (PJB) dengan IETPL, pihak berelasi, atas (SPA) with IETPL, related party, for 1,800 shares
saham-saham milik ICI pada IET, sejumlah 1.800 owned by ICI in IET.
lembar saham.
Setelah penandatanganan kedua PJB tersebut, After the signing of the SPA, IETPL and IIR
IETPL dan IIR memiliki masing-masing 90% dan effectively retained 90% and 10% of share
10% saham di IET. ownership in IET, respectively.
Berdasarkan PJB, jumlah harga pembelian saham Based on the SPA, total purchase price of shares
oleh IIR dan IETPL sebesar Rp 1.200.000.000 by IIR and IETPL amounted to Rp 1,200,000,000
(setara dengan US$ 85.076). Tidak terdapat (equivalent to US$ 85,076). No gain or loss
keuntungan dan kerugian yang diakui dalam recognized from the above transaction which was
transaksi di atas tetapi diakui sebagai bagian dari accounted for as an equity transaction.
ekuitas.
Selisih antara jumlah tercatat kepentingan non- The difference between the amount by which the
pengendali yang disesuaikan dan nilai wajar non-controlling interests are adjusted and the fair
imbalan yang dibayar sebesar US$ 932.505 diakui value of the consideration paid amounting to
sebagai komponen ekuitas lainnya. US$ 932,505 was recognized in other component
of equity.
Pada tanggal 29 November 2018, ICI On November 29, 2018, ICI entered into
menandatangani perjanjian dengan Prime Empire agreement with Prime Empire Investments Pte.
Investments Pte. Ltd. atas akuisisi 2.625.000 Ltd. for acquisition of 2,625,000 shares of MUTU
saham MUTU senilai US$ 9.900.000. Transaksi for US$ 9,900,000. The transaction was approved
tersebut telah disetujui oleh Kementerian Energi by The Ministry of Energy and Mineral Resources
dan Sumber Daya Mineral (ESDM) berdasarkan (ESDM) based on its letter No. 176/30/MEM.B/2019
surat No. 176/30/MEM.B/2019 tanggal 13 Mei dated May 13, 2019. On July 17, 2019, all
2019. Pada tanggal 17 Juli 2019, semua kondisi conditions precedents have been fulfilled. After
yang menjadi persyaratan dalam perjanjian sudah the effective of this transaction, the Company has
dipenuhi. Sesudah transaksi tersebut efektif, fully owned MUTU, through IIR with 85% of
Perusahaan telah sepenuhnya memiliki MUTU, ownership and ICI with 15% of ownership.
85% melalui IIR dan 15% melalui ICI.
Selisih antara jumlah tercatat kepentingan non- The difference between the amount recognized by
pengendali yang disesuaikan dan nilai wajar which the non-controlling interest are adjusted
imbalan yang dibayar sebesar US$ 33.492.429 and the fair value of the consideration paid
diakui sebagai komponen ekuitas lainnya. amounting to US$ 33,492,429 was recognized in
other component of equity.
Dengan penyelesaian transaksi penjualan saham With the completion of sale of shares in MUTU
MUTU (Catatan 14), Perusahaan melakukan (Note 14), the Company reclassified other
reklasifikasi komponen ekuitas lainnya sebesar components of equity of US$33,492,429
US$33.492.429, sebagaimana dijelaskan di atas, described above directly to retained earnings.
langsung ke laba ditahan.
h. Izin Usaha Pertambangan Khusus h.
h. Special Mining Business License
i.
Pada tanggal 16 Desember 2022, Menteri Energi j. On December 16, 2022, the Minister of Energy and
dan Sumber Daya Mineral (“MESDM”) Mineral Resources (“MoEMR”) granted The Special
memberikan persetujuan Izin Usaha Mining Business License (“IUPK”) as a
Pertambangan Khusus (“IUPK”) sebagai Continuation of the Contract/Agreement to
Kelanjutan Operasi Kontrak/Perjanjian yang Operate, which is valid until March 13, 2033 and
berlaku sampai dengan 13 Maret 2033 dan dapat can be extended in accordance with prevailing
diperpanjang sesuai dengan ketentuan yang regulation.
berlaku.
- 28 -
Page 33
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
Setelah memperoleh IUPK sebagai Kelanjutan k. Upon obtaining the IUPK as a Continuation of the
Operasi Kontrak/Perjanjian, ketentuan perpajakan Contract/Agreement to Operate, the provisions on
dan/atau Penerimaan Negara Bukan Pajak (PNBP) taxation and/or Non-Tax State Revenues (PNBP)
akan dilaksanakan oleh KJA sesuai dengan will be implemented by KJA in accordance with
ketentuan yang berlaku mulai tanggal 1 Januari prevailing regulations starting January 1, 2023.
2023.
Berdasarkan IUPK, KJA dapat melakukan kegiatan l. Based on IUPK, KJA may do operation production
operasi produksi pada wilayah pertambangan on mining areas covering an area of 33,887
seluas 33.887 hektar di Kabupaten Paser, hectares located in Paser district, East Kalimantan,
Kalimantan Timur, Indonesia. Indonesia.
Ketentuan-ketentuan keuangan penting dalam m. Significant financial provisions of the IUPK include:
IUPK meliputi:
Iuran tetap n. Dead rent
KJA wajib membayar iuran tetap dengan tarif KJA shall pay dead rent with rate in accordance
sesuai dengan ketentuan peraturan perundang- with applicable laws of Non-Tax State Revenue
undangan di bidang Penerimaan Negara Bukan from Ministry of Energy and Mineral Resources
Pajak pada Kementerian Energi dan Sumber Daya that prevail when IUPK as Continuation of the
Mineral yang berlaku pada saat IUPK sebagai Contract/Agreement issued.
Kelanjutan Operasi Kontrak/Perjanjian
diterbitkan.
Iuran Produksi atau royalty o. Production fees or royalty
Tarif iuran produksi atau royalti sesuai dengan Production fees rate or royalty are in accordance
ketentuan peraturan perundang-undangan di with applicable laws of Non-Tax State Revenue
bidang Penerimaan Negara Bukan Pajak pada from Ministry of Energy and Mineral Resources.
Kementrian Energi dan Sumber Daya Mineral.
Barang Milik Negara p. State-Owned Assets
Tarif pemanfaaatan barang milik negara eks The rate of State-Owned Assets utilization from ex
PKP2B dihitung dengan formula 0,21% dikalikan CCoW is calculated with 0.21% multiplied by the
harga jual. sales price.
Penerimaan Negara Bukan Pajak q. Non-Tax State Revenue
Tarif Penerimaan Negara Bukan Pajak berupa Non-Tax State Revenue from sale of mining
penjualan hasil tambang per ton dihitung results per tonne is calculated based on the
berdasarkan ketentuan: following requirements:
i. Untuk penjualan batubara yang r. i. For the sale of coal using the higher price
menggunakan harga yang lebih tinggi antara: between:
− Harga yang lebih rendah antara harga − Lower price between coal benchmark
patokan batubara atau indeks harga prices or coal price index at the time of
batubara pada saat transaksi; dan transaction; and
− Harga sesungguhnya atau seharusnya − Actual price or the price that should be
yang diterima atau diperoleh penjual, received by seller,
Maka tarif Penerimaan Negara Bukan Pajak s. Non-Tax State Revenue is calculated by:
dihitung sebesar:
− Harga Batubara Acuan (HBA) < USD 70 − Coal Benchmark Price (HBA) < USD 70
per ton, tarif 14% dikalikan harga jual, per tonne, rate of 14% is multiplied with
lalu dikurangi tarif iuran produksi atau sales price less production fees or royalty
royalti dikurangi tarif pemanfaatan less utilization rate of State-Owned
barang milik negara eks PKP2B dari hasil Assets ex CCoW from production result
produksi per ton. per tonne.
− HBA ≥ USD 70 per ton sampai dengan < − HBA ≥ USD 70 per tonne until < USD 80
USD 80 per ton, tarif 17% dikalikan per tonne, rate of 17% is multiplied with
harga jual, lalu dikurangi tarif iuran sales price less production fees or royalty
- 29 -
Page 34
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
produksi atau royalti dikurangi tarif less utilization rate of State-Owned
pemanfaatan barang milik negara eks Assets ex CCoW from production result
PKP2B dari hasil produksi per ton. per tonne.
− HBA ≥ USD 80 per ton sampai dengan < − HBA ≥ USD 80 per tonne until < USD 90
USD 90 per ton, tarif 23% dikalikan per tonne, rate of 23% is multiplied with
harga jual, lalu dikurangi tarif iuran sales price less production fees or royalty
produksi atau royalti dikurangi tarif less utilization rate of State-Owned
pemanfaatan barang milik negara eks Assets ex CCoW from production result
PKP2B dari hasil produksi per ton. per tonne.
− HBA ≥ USD 90 per ton sampai dengan < − HBA ≥ USD 90 per tonne until < USD 100
USD 100 per ton, tarif 25% dikalikan per tonne, rate of 25% is multiplied with
harga jual, lalu dikurangi tarif iuran sales price less production fees or royalty
produksi atau royalti dikurangi tarif less utilization rate of State-Owned
pemanfaatan barang milik negara eks Assets ex CCoW from production result
PKP2B dari hasil produksi per ton. per tonne.
− HBA ≥ USD 100 per ton, tarif 28% − HBA ≥ USD 100 per tonne, rate of 28%
dikalikan harga jual, lalu dikurangi tarif is multiplied with sales price less
iuran produksi atau royalti dikurangi tarif production fees or royalty less utilization
pemanfaatan barang milik negara eks rate of State-Owned Assets ex CCoW
PKP2B dari hasil produksi per ton. from production result per tonne.
t.
ii. Untuk penjualan batubara yang u. ii. For the sale of coal using price in accordance
menggunakan harga sesuai dengan with laws and regulation in Mineral and Coal
ketentuan peraturan perundang-undangan di Mining in certain cases, Non-Tax State
bidang Mineral dan Batubara dalam hal Revenue is calculated with rate of 14%
tertentu, tarif Penerimaan Negara Bukan multiplied with sales price less production
Pajak dihitung sebesar 14% dikalikan harga fees or royalty less utilization rate of State-
jual dikurangi tarif iuran produksi atau royalti Owned Assets ex CCoW from production
dikurangi tarif pemanfaatan barang milik result per tonne.
negara eks PKP2B dari hasil produksi per ton.
Bagian pemerintah pusat dan pemerintah daerah v. Central and local government shares
Penerimaan Negara Bukan Pajak berupa bagian Non-Tax State Revenue consists of central
pemerintah pusat sebesar 4% dari keuntungan government share amounting 4% from IUPK
bersih pemegang IUPK dan bagian pemerintah holder net income and local government share
daerah sebesar 6% dari keuntungan bersih amounting 6% from IUPK holder net income.
pemegang IUPK.
Pajak penghasilan badan w. Corporate income tax
Pajak penghasilan atas laba tahunan KJA dihitung Corporate income taxes in respect of the annual
sesuai dengan ketentuan hukum dan peraturan profits of KJA should be computed in accordance
yang berlaku di Indonesia yaitu tarif pajak with the prevailing laws and regulations in
penghasilan Badan sebesar 22% dari penghasilan Indonesia with the corporate tax rate 22% of the
kena pajak. taxable income.
x.
Mata Uang Pembukuan y. Currency
KJA sebagai pemegang IUPK menyelenggarakan KJA as IUPK holder maintains its accounting
pembukuan dalam mata uang Dollar Amerika records in in United States Dollar
Serikat (U.S. Dollar atau US$) sebagaimana (U.S. Dollar or US$) as required under the CCoW
diwajibkan dalam PKP2B selama satu tahun pajak for one fiscal year after IUPK as a Continuation of
setelah IUPK sebagai Kelanjutan Operasi the Contract/Agreement issued.
Kontrak/Perjanjian diterbitkan.
z.
Setelah satu tahun pajak tersebut, KJA akan aa.After one fiscal year, KJA will submit written notice
menyampaikan pemberitahuan tertulis terkait regarding the usage of United States Dollar (U.S.
penggunaan mata uang Dollar Amerika Serikat Dollar or US$) as accounting currency in
(U.S. Dollar atau US$) sebagai mata uang accordance with prevailing tax laws and
pembukuan sesuai ketentuan peraturan regulation.
perundang-undangan di bidang perpajakan.
bb.
- 30 -
Page 35
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
Ketentuan perpajakan lainnya cc. Other taxation provisions
Ketentuan perpajakan lainnya yang berlaku Other prevailing taxation provisions are as follow:
antara lain:
i. Pajak penghasilan pemotongan dan i. Withholding taxes are in accordance with laws
pemungutan sesuai dengan ketentuan and regulation of income tax.
perundang-undangan Pajak Penghasilan.
ii. Pajak pertambahan nilai sesuai dengan ii. Value Added Tax is in accordance with with
ketentuan peraturan perundang-undangan di laws and regulation of Value Added Tax.
Pajak Pertambahan Nilai Barang.
iii. Pajak karbon sesuai dengan ketentuan iii. Carbon Tax is in accordance with with laws
peraturan perundang-undangan di bidang and regulation of Carbon Tax.
Pajak Karbon.
iv. Bea Meterai sesuai dengan perundang- iv. Stamp Duty is in accordance with with laws
undangan di Bidang Bea Meterai. and regulation of Stamp Duty.
v. Bea masuk dan bea keluar sesuai dengan v. Import duty and export duty are in
ketentuan peraturan perundang-undangan di accordance with with laws and regulation of
bidang Kepabeanan. customs.
vi. Cukai sesuai dengan ketentuan peraturan vi. Customs are in accordance with with laws and
perundang-undangan di bidang Cukai. regulation of Customs.
vii. Pajak daerah dan retribusi daerah sesuai vii. Local Taxes and Retributions are in
dengan ketentuan peraturan perundang- accordance with with laws and regulation of
undangan di bidang Pajak Daerah dan Local Taxes and Retributions.
Retribusi Daerah.
KJA mengoperasikan enam tambang batubara KJA operates six active mines at its concession
aktif dalam wilayah konsesinya, dimana cadangan areas, where aggregate probable and proved coal
batubara terkira dan terbukti diestimasi sebesar reserves were estimated to be 569 million tons
569 juta ton dan perkiraan sumber daya batubara, and the total estimated coal resources, including
termasuk cadangan batubara, adalah sebesar coal reserves, were 1,625 million tons as of
1.625 juta ton per tanggal 31 Desember 2017, December 31, 2017, according to a JORC
berdasarkan laporan JORC yang disusun oleh PT compliant report prepared by PT Runge Pincock
Runge Pincock Minarco pada tanggal 30 Januari Minarco dated January 30, 2019. Such JORC
2019. Laporan JORC tersebut telah diperbaharui report has been updated several times by the
beberapa kali oleh konsultan yang sama, terakhir same consultant, most recently through its report
melalui laporan per tanggal 11 April 2024, dimana dated April 11, 2024, wherein total coal resources
sumber daya dan cadangan batubara KJA and reserves of KJA were estimated at 1,449
diestimasi sebesar 1.449 juta ton dan 468,2 juta million tons and 468.2 million tons as at December
ton per tanggal 31 Desember 2023. Total produksi 31, 2023. KJA’s total coal production for the nine-
batubara KJA untuk periode sembilan bulan yang month period ended September 30, 2024 was
berakhir pada 30 September 2024 adalah 23,4 23.4 million tons, with accumulated production of
juta ton, dengan akumulasi produksi 700,1 juta approximately 700.1 million tons as at September
ton per 30 September 2024 efektif dari tanggal 30, 2024 effective from its commercial production
dimulainya produksi komersial KJA pada tahun in 1993.
1993.
i. Kontrak Karya Emas i.
dd.Gold Contract of Work
ee.
Masmindo melakukan penambangan emas dan ff. Masmindo is engaged in the gold and silver (and
perak (beserta dengan mineral terkait) dalam area its associated mineral) mining activities in a
Kontrak Karya (CoW) yang telah disetujui oleh Contract of Work (CoW) area as approved by the
Pemerintah Republik Indonesia, dengan luas Government of the Republic of Indonesia, with
wilayah kerja sebesar 14.390 hektar di working area of 14,390 hectares in Latimojong
Latimojong, Luwu, Provinsi Sulawesi Selatan, District, Luwu Regency, South Sulawesi Province,
Indonesia. CoW diberikan kepada Masmindo pada Indonesia. The CoW was granted to Masmindo on
tanggal 19 Februari 1998 dan amandemen February 19, 1998, and an amendment to closely
terhadap CoW untuk menyesuaikan kembali align the CoW to prevailing regulations was signed
dengan peraturan yang berlaku telah on March 13, 2018.
ditandatangani pada tanggal 13 Maret 2018.
Pada tanggal 17 Juni 2015, Masmindo gg.On June 17, 2015, Masmindo obtained Approval
memperoleh persetujuan atas Laporan Final Studi on Final Feasibility Study Techno-economy Report
Kelayakan Techno-economy berdasarkan based on the decision of Ministry of Energy and
- 31 -
Page 36
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
keputusan Menteri Energi dan Sumber Daya Mineral Resources Republic of Indonesia,
Mineral Republik Indonesia, Direktorat Jendral Directorate General Mineral and Coal (“ESDM”)
Mineral dan Batubara (“ESDM”) No. 1082/30/DBM/2015. On May 17, 2017,
No. 1082/30/DBM/2015. Pada tanggal 17 Mei Masmindo obtained Final Approval on Feasibility
2017, Masmindo mendapatkan persetujuan final Study based on the decision of ESDM
atas Studi Kelayakan berdasarkan keputusan No. 1056/30/DJB2017. On July 9, 2019,
ESDM No. 1056/30/DJB2017. Pada tanggal 9 Juli Masmindo obtained Approval on Addendum of
2019, Masmindo memperoleh persetujuan atas Feasibility Study based on the decision of ESDM
Adendum Studi Kelayakan berdasarkan keputusan No. 1160/31.02/DBM.PE/2019.
ESDM No. 1160/31.02/DBM.PE/2019.
hh.
Pada tanggal 20 April 2022, Masmindo ii. On April 20, 2022, Masmindo obtained approval on
memperoleh persetujuan atas adendum studi addendum of feasibility study based on the
kelayakan berdasarkan keputusan ESDM decision of ESDM No. T-1000/MB.04/DBM.PE/2022.
No. T-1000/MB.04/DBM.PE/2022.
jj.
Pada tanggal 12 April 2017, Masmindo kk.On April 12, 2017, Masmindo obtained AMDAL
memperoleh Persetujuan AMDAL dan Izin Approval and Environmental Permit based on
Lingkungan masing-masing berdasarkan the Governor of South Sulawesi Decree
ketetapan Gubernur Sulawesi Selatan No. 3/M.02a.NP/P2T/03/2017 and Decree
No. 3/M.02a.NP/P2T/03/2017 dan ketetapan No. 2/M.02b.P/P2T/03/2017, respectively. On
No. 2/M.02b.P/P2T/03/2017. Pada tanggal October 17, 2019, Masmindo obtained Addendum
17 Oktober 2019, Masmindo memperoleh AMDAL Approval and Environmental Permit based
Adendum Persetujuan AMDAL dan Ijin Lingkungan on the Governor of South Sulawesi Decree
masing-masing berdasarkan ketetapan Gubernur No. 14/M.02a/PTSP/2019 and Decree
Sulawesi Selatan No. 14/M.02a/PTSP/2019 dan No. 15/M.02b/PTSP/2019, respectively.
ketetapan No. 15/M.02b/PTSP/2019.
ll.
Pada tanggal 20 Juni 2017, Masmindo mm. On June 20, 2017, Masmindo obtained
memperoleh izin konstruksi selama 3 (tiga) tahun construction permit for 3 (three) years based
berdasarkan Ketetapan Menteri Energi dan on the Decree of Minister of Energy and
Sumber Daya Mineral Republik Indonesia Mineral Resources Republic of Indonesia
No. 318.K/30/DJB/2017. No. 318.K/30/DJB/2017.
nn.
Pada tanggal 16 Januari 2018, masa konstruksi oo.On January 16, 2018, Masmindo’s construction
Masmindo digabung dengan masa operasi dan period was merged to the operation and
produksi berdasarkan Ketetapan Menteri Energi production period based on the Decree of Minister
dan Sumber Daya Mineral Republik Indonesia of Energy and Mineral Resources Republic of
No. 171.K/30/DJB/2018. Indonesia No. 171.K/30/DJB/2018.
pp.
j. Program Opsi Saham Karyawan dan j.
qq.Employee and Management Stock Option
Manajemen Program
rr.
Pada bulan Februari 2008, para pemegang saham ss. In February 2008, the stockholders approved the
menyetujui Program Pemilikan Saham Karyawan Employee and Management Stock Option Program
dan Manajemen (EMSOP). Program EMSOP ini (EMSOP). Issuance and distribution of options
diberikan dalam 3 tahap. Peserta EMSOP akan related to the EMSOP program will be
ditetapkan oleh direksi Perusahaan selambat- implemented in 3 stages. Eligible participants in
lambatnya 14 hari sebelum penerbitan opsi untuk the EMSOP will be announced by Board of
masing-masing tahap. Jumlah opsi sebanyak Directors at the latest 14 days prior to the
104.142.000 atau 2% dari seluruh jumlah saham issuance of options during each stage. The total
ditempatkan dan disetor penuh setelah penawaran options amounted to 104,142,000 or 2% of the
umum saham (IPO) dan dialokasikan dalam post-IPO issued and paid-up shares allocated to
3 tahap yaitu: tahap I dan II masing-masing three stages: first and second stages with
sebanyak 31.242.500 opsi dan tahap III sebanyak 31,242,500 each and third stage with 41,657,000
41.657.000 opsi. options.
tt.
Opsi ini tidak dapat dialihkan dan diperdagangkan. uu. The options are non-transferable and non-
Setiap opsi yang didistribusikan pada setiap tahap tradeable. Each of the option distributed in each
berlaku untuk jangka waktu 5 tahun sejak tanggal stage is valid for 5 years as of the date of its
penerbitan. Opsi tersebut memiliki masa tunggu issuance. The options are subject to a one year
satu tahun, dimana selama masa tunggu tersebut, vesting period, during which the participant is not
peserta tidak dapat melaksanakan opsinya. able to exercise the option.
vv.
- 32 -
Page 37
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
Harga pelaksanaan opsi akan ditetapkan ww. The exercise price for the option will be
berdasarkan Peraturan Pencatatatan Efek determined based on the Listing Rule No. 1-A, as
No. 1-A, Lampiran Keputusan Direksi Bursa Efek attached to the Decree of the Board of Directors
Indonesia (BEI) No. KEP-305/BEJ/07-2004, of Indonesia Stock Exchange (IDX)
tanggal 19 Juli 2004, yang mengatur bahwa harga No. KEP-305/BEJ/07-2004 dated July 19, 2004,
pelaksanaan adalah minimum 90% dari harga which regulates that the exercise price is at least
rata-rata 25 hari bursa sebelum pemberitahuan 90% of the average price of the shares during a
Perusahaan kepada BEI mengenai dibukanya 25-days period prior to the Company's
periode pelaksanaan. Periode pelaksanaan announcement to IDX at the start of an exercise
maksimum 2 kali dalam setahun. window. There will be at most, two exercise period
per year.
xx.
Berdasarkan surat keputusan Direksi No. 234/IE- yy. Based on Director's Decision Letter No. 234/IE-
BOD/VIII/2009 tanggal 11 Agustus 2009 kepada BOD/VIII/2009 dated August 11, 2009 to the
Direksi Bursa Efek Indonesia, direksi Perusahaan Director of Indonesia Stock Exchange, the
menetapkan harga pelaksanaan opsi sebesar Directors of the Company have agreed on the
Rp 2.138. Nilai wajar opsi diestimasi pada tanggal exercise price of Rp 2,138. The fair value of the
pemberian opsi dengan menggunakan model Black option is estimated on the grant date using the
- Scholes Option Pricing. Asumsi utama yang Black - Scholes Option Pricing model. Key
digunakan dalam perhitungan nilai wajar opsi assumptions used in calculating the fair value of
adalah sebagai berikut: the options were as follows:
zz.
Tingkat suku bunga bebas risiko 9,67% Risk - free interest rate
Periode opsi 5 tahun/years Option period
Perkiraan volatilitas harga saham 69,80% Expected stock price volatility
Perkiraan dividen 5,30% Expected dividend
Tidak terdapat pemberian opsi beban kompensasi There are no compensation expenses for
program saham karyawan selama selama periode employee and management stock option during
sembilan bulan yang berakhir pada 30 September the nine-month periods ended September 30,
2024 dan 2023. 2024 and 2023.
Pada tanggal 30 September 2024 dan 31 As of September 30, 2024 and December 31
Desember 2023, saldo komponen ekuitas lainnya 2023, other components of equity for employee
atas opsi saham karyawan sebesar stock options amounted to US$ 7,816,296.
US$ 7.816.296.
2. PENERAPAN STANDAR AKUNTANSI KEUANGAN 2. ADOPTION OF NEW AND REVISED STATEMENTS
BARU DAN REVISI (”PSAK”) DAN INTERPRETASI OF FINANCIAL ACCOUNTING STANDARDS
STANDAR AKUNTANSI KEUANGAN (”ISAK”) (“PSAK”) AND INTERPRETATIONS OF PSAK
(“ISAK”)
a. Amendemen/ Penyesuaian Standar yang b. a. Amendments/ Improvements to Standards
Berlaku Efektif pada Tahun Berjalan Effective in the Current Year
Dalam periode berjalan, Grup telah menerapkan In the current period, the Group has applied a
sejumlah amendemen/penyesuaian PSAK yang number of amendments/ improvements to PSAK
relevan dengan operasinya dan efektif untuk that are relevant to its operations and effective for
periode akuntansi yang dimulai pada atau setelah accounting period beginning on or after January 1,
1 Januari 2024. Penerapan atas amandemen/ 2024. The adoption of these amendments/
penyesuaian tersebut tidak mengakibatkan improvements does not result in changes to the
perubahan atas kebijakan akuntansi Grup dan Group's accounting policies and has no material
tidak memiliki pengaruh signifikan atas impact to disclosures or on the amounts
pengungkapan atau jumlah yang dicatat di dalam recognized in the current period and prior years
laporan keuangan konsolidasian pada periode consolidated financial statements.
berjalan dan tahun-tahun sebelumnya.
• PSAK 201 (amendemen) Penyajian Laporan • PSAK 201 (amendment) Presentation of
Keuangan: Klasifikasi Liabilitas sebagai Jangka financial statements: Classification of
Pendek atau Jangka Panjang. Liabilities as Current or Non-current.
- 33 -
Page 38
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
• PSAK 116 (amandemen) Sewa: Liabilitas Sewa • PSAK 116 (amendment) Leases: Lease
pada Transaksi Jual dan Sewa-balik. Liability in a Sale and Leaseback.
• PSAK 201 (amandemen) Penyajian Laporan • PSAK 201 (amendment) Presentation of
Keuangan: Penyajian Laporan Keuangan financial statements: Non-current Liabilities
terkait Liabilitas Jangka Panjang dengan with Covenants.
Kovenan.
• PSAK 207 (amandemen) Laporan arus kas dan • PSAK 207 (amendment) Statement of cash
PSAK 107 (amandemen) Instrumen Keuangan: flows and PSAK 107 (amendment) Financial
Pengungkapan : Pengaturan Pembiayaan Instruments : Disclosures : Supplier Finance
Pemasok. Arrangements.
Mulai tanggal 1 Januari 2024, referensi terhadap Beginning January 1, 2024 references to the
masing-masing PSAK dan ISAK akan diubah individual PSAKs and ISAKs will be changed as
sebagaimana diumumkan oleh Dewan Standar published by Dewan Standar Akuntasi Keuangan
Akuntansi Keuangan Ikatan Akuntan Indonesia Ikatan Akuntan Indonesia (“DSAK – IAI”).
(“DSAK – IAI”).
b. Standar dan Amendemen/Penyesuaian b. b. Standard and Amendments/ Improvements
Standar Telah Diterbitkan Tapi Belum to Standards Issued not yet Adopted
Diterapkan
Pada tanggal persetujuan laporan keuangan At the date of authorization of these consolidated
konsolidasian, standar, interpretasi dan financial statements, the following standard,
amandemen-amandemen atas PSAK yang relevan interpretation and amendments to PSAK relevant
bagi Grup, yang telah diterbitkan namun belum to the Group were issued but not effective, with
berlaku efektif, dengan penerapan dini diijinkan, early application permitted:
adalah sebagai berikut:
Efektif untuk periode yang dimulai pada atau Effective for periods beginning on or after January
setelah tanggal 1 Januari 2025 1, 2025
• PSAK 117 Kontrak Asuransi • PSAK 117 Insurance Contracts
• PSAK 117 (amandemen) Kontrak Asuransi: • PSAK 117 (amendment) Insurance Contracts:
Penerapan awal PSAK 117 dan PSAK 109 - Initial application of PSAK 117 and PSAK 109
Informasi Komparatif - Comparative Information
• PSAK 221 (amandemen) Pengaruh Perubahan • PSAK 221 (amendment) The effects of
Kurs Valuta Asing : Kekurangan Ketertukaran changes in foreign exchange rates: Lack of
Exchangeability
Sampai dengan tanggal penerbitan laporan As of the issuance date of the consolidated
keuangan konsolidasian, dampak dari penerapan financial statements, the effects of adopting these
amendemen dan interpretasi tersebut terhadap amendments and interpretations on the
laporan keuangan konsolidasian tidak dapat consolidated financial statements are not known
diketahui atau diestimasi oleh manajemen. nor reasonably estimable by management.
3. INFORMASI KEBIJAKAN AKUNTANSI YANG 3. MATERIAL ACCOUNTING POLICY INFORMATION
MATERIAL
a. Pernyataan Kepatuhan a. Statement of Compliance
Laporan keuangan konsolidasian Grup disusun The consolidated financial statements of the
sesuai dengan Standar Akuntansi Keuangan di Group have been prepared in accordance with
Indonesia. Indonesian Financial Accounting Standards.
b. Dasar Penyusunan b. Basis of Preparation
Dasar penyusunan laporan keuangan The consolidated financial statements have been
konsolidasian adalah biaya historis, kecuali prepared on the historical cost basis except for
properti dan instrumen keuangan tertentu yang certain properties and financial instruments that
diukur pada jumlah revaluasian atau nilai wajar are measured at revalued amounts or fair values
pada setiap akhir periode pelaporan, yang at the end of each reporting period, as explained
- 34 -
Page 39
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
dijelaskan dalam kebijakan akuntansi di bawah in the accounting policies below, and using
ini, dan basis akrual kecuali untuk penyusunan accrual basis except for the consolidated
laporan arus kas konsolidasian pada setiap statement of cash flow at the end of each
periode pelaporan. reporting date.
Biaya historis umumnya didasarkan pada nilai Historical cost is generally based on the fair
wajar dari imbalan yang diberikan dalam value of the consideration given in exchange for
pertukaran barang dan jasa. goods and services.
Nilai wajar adalah harga yang akan diterima Fair value is the price that would be received to
untuk menjual suatu aset atau harga yang akan sell an asset or paid to transfer a liability in an
dibayar untuk mengalihkan suatu liabilitas orderly transaction between market participants
dalam suatu transaksi teratur antara pelaku at the measurement date, regardless of whether
pasar pada tanggal pengukuran, terlepas dari that price is directly observable or estimated
apakah harga tersebut dapat diamati secara using another valuation technique. In estimating
langsung atau diestimasi menggunakan teknik the fair value of an asset or a liability, the Group
penilaian lain. Dalam mengestimasi nilai wajar takes into account the characteristics of the
dari suatu aset atau liabilitias, Grup asset or liability if market participants would
memperhitungkan karakteristik aset atau take those characteristics into account when
liabilitas jika pelaku pasar akan pricing the asset or liability at the measurement
memperhitungkan karakteristik tersebut ketika date. Fair value for measurement and/or
menentukan harga aset atau liabilitas pada disclosure purposes in these consolidated
tanggal pengukuran. Nilai wajar untuk tujuan financial statements is determined on such a
pengukuran dan/atau pengungkapan pada basis, except for share-based payment
laporan keuangan konsolidasian ditentukan atas transactions that are within the scope of PSAK
dasar tersebut, kecuali untuk transaksi 102 Share-based Payment, leasing transactions
pembayaran berbasis saham yang merupakan that are within the scope of PSAK 116, and
ruang lingkup PSAK 102 Pembayaran Berbasis measurements that have some similarities to
Saham, transaksi sewa yang merupakan ruang fair value but are not fair value, such as net
lingkup PSAK 116, dan pengukuran yang realizable value in PSAK 202 Inventories or
memiliki kemiripan dengan nilai wajar namun value in use in PSAK 236.
bukan merupakan nilai wajar, seperti nilai
realisasi bersih dalam PSAK 202 Persediaan atau
nilai pakai dalam PSAK 236.
Laporan arus kas konsolidasian disusun dengan The consolidated statements of cash flows are
menggunakan metode langsung dengan prepared using the direct method with
mengelompokkan arus kas dalam aktivitas classifications of cash flows into operating,
operasi, investasi dan pendanaan. investing and financing activities.
Direksi memiliki, pada saat persetujuan laporan The directors have, at the time of approving the
keuangan konsolidasian, suatu ekspektasi yang consolidated financial statements, a reasonable
memadai bahwa Grup memiliki sumber daya expectation that the Group has adequate
yang cukup untuk melanjutkan keberadaan resources to continue in operational existence
operasinya untuk di masa yang akan datang. for the foreseeable future. Thus, they continue
Sehingga, mereka melanjutkan penerapan to adopt the going concern basis of accounting
dasar akuntansi kelangsungan usaha dalam in preparing the consolidated financial
penyusunan laporan keuangan konsolidasian. statements.
c. Dasar Konsolidasian c. Basis of Consolidation
Laporan keuangan konsolidasian The consolidated financial statements
menggabungkan laporan keuangan Perusahaan incorporate the financial statements of the
dan entitas yang dikendalikan oleh Grup Company and entities (including structured
(termasuk entitas terstruktur). Pengendalian entities) controlled by the Group. Control is
tercapai jika Perusahaan memiliki kekuasaan achieved where the Company has the power
atas investee; eksposur atau hak atas imbal over the investee; is exposed, or has rights, to
hasil variabel dari keterlibatannya dengan variable returns from its involvement with the
investee; dan kemampuan untuk menggunakan investee; and has the ability to use its power to
kekuasaannya atas investee untuk affect its returns.
mempengaruhi jumlah imbal hasil investor.
- 35 -
Page 40
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
Perusahaan menilai kembali apakah Perusahaan The Company reassesses whether or not it
mengendalikan investee jika fakta dan keadaan controls an investee if facts and circumstances
yang mengindikasikan adanya perubahan indicate that there are changes to one or more
terhadap satu atau lebih dari tiga elemen of the three elements of control listed above.
pengendalian yang disebutkan di atas.
Ketika Perusahaan memiliki hak suara kurang When the Company has less than a majority of
dari mayoritas di-investee, ia memiliki the voting rights of an investee, it has power
kekuasaan atas investee ketika hak suara over the investee when the voting rights are
investor cukup untuk memberinya kemampuan sufficient to give it the practical ability to direct
praktis untuk mengarahkan aktivitas the relevant activities of the investee
relevan secara sepihak. Perusahaan unilaterally. The Company considers all relevant
mempertimbangkan seluruh fakta dan keadaan facts and circumstances in assessing whether or
yang relevan dalam menilai apakah hak suara not the Company’s voting rights in an investee
Perusahaan cukup untuk memberikan are sufficient to give it power, including (i) the
Perusahaan kekuasaan, termasuk (i) ukuran size of the Company’s holding of voting rights
kepemilikan hak suara Perusahaan relatif relative to the size and dispersion of holding of
terhadap ukuran dan penyebaran kepemilikan the other vote holders; (ii) potential voting
pemilik hak suara lain; (ii) hak suara potensial rights held by the Company, other vote holders
yang dimiliki oleh Perusahaan, pemegang suara or other parties; (iii) rights arising from other
lain atau pihak lain; (iii) hak yang timbul dari contractual arrangements; and (iv) any
pengaturan kontraktual lain; dan (iv) setiap additional facts and circumstances that indicate
fakta dan keadaan tambahan apapun that the Company has, or does not have, the
mengindikasikan bahwa Perusahaan memiliki, current ability to direct the relevant activities at
atau tidak memiliki, kemampuan kini untuk the time that decisions need to be made,
mengarahkan aktivitas yang relevan pada saat including voting patterns at previous
keputusan perlu dibuat, termasuk pola suara shareholders’ meetings.
pemilikan dalam RUPS sebelumnya.
Konsolidasi entitas anak dimulai ketika Consolidation of a subsidiary begins when the
Perusahaan memperoleh pengendalian atas Company obtains control over the subsidiary
entitas anak dan akan dihentikan ketika and ceases when the Company loses control of
Perusahaan kehilangan pengendalian pada the subsidiary. Specifically, income and expense
entitas anak. Secara khusus, pendapatan dan of a subsidiary acquired or disposed of during
beban entitas anak diakuisisi atau dijual selama the year are included in the consolidated
tahun berjalan termasuk dalam laporan laba statement of profit or loss and other
rugi konsolidasian dan penghasilan comprehensive income from the date the Group
komprehensif lain dari tanggal diperolehnya gains control until the date when the Company
pengendalian Grup sampai tanggal ketika ceases to control the subsidiary.
Perusahaan berhenti untuk mengendalikan
entitas anak.
Laba atau rugi dan setiap komponen Profit or loss and each component of other
penghasilan komprehensif lain diatribusikan comprehensive income are attributed to the
kepada pemilik entitas induk dan untuk owners of the Company and to the non-
kepentingan non-pengendali. Perusahaan juga controlling interest. Total comprehensive
mengatribusikan jumlah penghasilan income of subsidiaries is attributed to the
komprehensif entitas anak kepada pemilik owners of the Company and the non-controlling
entitas induk dan kepentingan non-pengendali interest even if this results in the non-controlling
meskipun hal tersebut mengakibatkan interest having a deficit balance.
kepentingan non-pengendali memiliki saldo
defisit.
Jika diperlukan, penyesuaian dapat dilakukan When necessary, adjustment are made to the
terhadap laporan keuangan entitas anak agar financial statements of subsidiaries to bring their
kebijakan akuntansi sesuai dengan kebijakan accounting policies in line with the Group
akuntansi Grup. accounting policies.
Seluruh aset dan liabilitas dalam intra Grup, All intragroup assets and liabilities, equity,
ekuitas, pendapatan, biaya dan arus kas yang income, expenses and cash flows relating to
berkaitan dengan transaksi dalam Grup transactions between members of the Group are
dieliminasi secara penuh pada saat eliminated in full on consolidation.
konsolidasian.
- 36 -
Page 41
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
Kepentingan nonpengendali di entitas anak Non-controlling interests in subsidiaries are
diidentifikasi secara terpisah dari ekuitas Grup identified separately from the Group’s equity
yang ada. Kepentingan pemegang saham therein. Those interests of non-controlling
nonpengendali yang merupakan kepentingan stockholders that are present ownership
kepemilikan yang memberikan pemiliknya hak interests entitling their holders to a
terhadap bagian proporsional aset bersih pada proportionate share of net assets upon
saat likuidasi pada awalnya dapat diukur liquidation may initially be measured at fair
sebesar nilai wajar atau bagian proporsional value or at the non-controlling interests’
kepentingan nonpengendali atas nilai wajar aset proportionate share of the fair value of the
bersih teridentifikasi pihak yang diakuisisi. acquiree’s identifiable net assets. The choice of
Pilihan pengukuran dibuat untuk masing-masing measurement is made on an acquisition-by-
akuisisi. Kepentingan nonpengendali lain acquisition basis. Other non-controlling interests
awalnya diukur sebesar nilai wajar. Setelah are initially measured at fair value. Subsequent
akuisisi, jumlah tercatat kepentingan to acquisition, the carrying amount of non-
nonpengendali adalah jumlah kepentingan controlling interests is the amount of those
tersebut pada pengakuan awal ditambah bagian interests at initial recognition plus the non-
kepentingan nonpengendali dari perubahan controlling interests’ share of subsequent
selanjutnya di ekuitas. changes in equity.
Perubahan kepemilikan Grup pada entitas anak Changes in the Group’s ownership interest in
yang tidak mengakibatkan kehilangan subsidiaries that do not result in the Group
pengendalian Grup atas entitas anak dicatat losing control over the subsidiaries are
sebagai transaksi ekuitas. Jumlah tercatat dari accounted for as equity transactions. The
kepemilikan Grup dan kepentingan carrying amounts of the Group’s interest and the
nonpengendali disesuaikan untuk non-controlling interest are adjusted to reflect
mencerminkan perubahan kepentingan the changes in their relative interest in the
relatifnya dalam entitas anak. Selisih antara subsidiaries. Any difference between the amount
jumlah tercatat kepentingan non-pengendali by which the non-controlling interest are
yang disesuaikan dan nilai wajar imbalan yang adjusted and the fair value of the consideration
dibayar atau diterima diakui secara langsung paid or received is recognized directly in equity
dalam ekuitas dan diatribusikan kepada pemilik and attributed to owners of the Company.
entitas induk.
Ketika Grup kehilangan pengendalian pada When the Group lose control of a subsidiary, a
entitas anak, keuntungan atau kerugian diakui gain or loss is recognized in profit or loss and is
dalam laba rugi dan dihitung sebagai perbedaan calculated as the difference between (i) the
antara (i) agregat nilai wajar pembayaran yang aggregate of the fair value of the consideration
diterima dan nilai wajar sisa kepemilikan received and the fair value of any retained
(retained interest) dan (ii) jumlah tercatat interest and (ii) the previous carrying amount of
sebelumnya dari aset (termasuk goodwill), the assets (including goodwill), less liabilities of
dikurangi liabilitas dari entitas anak dan setiap the subsidiary and any non-controlling
kepentingan non-pengendali. Seluruh jumlah interest. All amounts previously recognized in
yang diakui sebelumnya dalam penghasilan other comprehensive income in relation to that
komprehensif lain yang terkait dengan entitas subsidiary are accounted for as if the Group had
anak yang dicatat seolah-olah Grup telah directly disposed of the related assets or
melepaskan secara langsung aset atau liabilitas liabilities of the subsidiary (i.e. reclassified to
terkait entitas anak (yaitu direklasifikasi ke laba profit or loss or transferred to another category
rugi atau ditransfer ke kategori lain dari ekuitas of equity as specified/ permitted by applicable
sebagaimana ditentukan/diizinkan oleh standar accounting standards). The fair value of any
akuntansi yang berlaku). Nilai wajar setiap sisa investment retained in the former subsidiary at
investasi pada entitas anak terdahulu pada the date when control is lost is regarded as the
tanggal hilangnya pengendalian dianggap fair value on initial recognition for subsequent
sebagai nilai wajar pada saat pengakuan awal accounting under PSAK 109, when applicable,
untuk akuntansi berikutnya dalam PSAK 109, the cost on initial recognition of an investment
ketika berlaku, biaya perolehan pada saat in an associate or a joint venture.
pengakuan awal dari investasi pada entitas
asosiasi atau ventura bersama.
- 37 -
Page 42
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
d. Kombinasi Bisnis d. Business Combinations
Akuisisi bisnis dicatat dengan menggunakan Acquisitions of businesses are accounted for
metode akuisisi. Imbalan yang dialihkan dalam using the acquisition method. The consideration
suatu kombinasi bisnis diukur pada nilai wajar, transferred in a business combination is
yang dihitung sebagai hasil penjumlahan dari measured at fair value, which is calculated as
nilai wajar tanggal akuisisi atas seluruh aset the sum of the acquisition-date fair values of the
yang dialihkan oleh Grup, liabilitas yang diakui assets transferred by the Group, liabilities
oleh Grup kepada pemilik sebelumnya dari pihak incurred by the Group, to the former owners of
yang diakuisisi dan kepentingan ekuitas yang the acquiree, and the equity interests issued by
diterbitkan oleh Grup dalam pertukaran the Group in exchange for control of the
pengendalian dari pihak yang diakuisisi. Biaya- acquiree. Acquisition-related costs are
biaya terkait akuisisi diakui di dalam laba rugi recognized in profit or loss as incurred.
pada saat terjadinya.
Pada tanggal akuisisi, aset teridentifikasi yang At the acquisition date, the identifiable assets
diperoleh dan liabilitas yang diambil alih diakui acquired and the liabilities assumed are
pada nilai wajar, kecuali untuk: recognized at their fair value, except that:
• Aset atau liabilitas pajak tangguhan yang • Deferred tax assets or liabilities and assets
berkaitan dengan pengaturan imbalan kerja or liabilities related to employee benefit
diakui dan diukur masing-masing arrangements are recognized and
berdasarkan PSAK 212 Pajak Penghasilan measured in accordance with PSAK 212
dan PSAK 219 Imbalan Kerja; Income Taxes and PSAK 219 Employee
Benefits, respectively;
• Instrumen liabilitias atau ekuitas yang • Liabilities or equity instruments related to
berkaitan dengan perjanjian pembayaran share-based payment arrangements of the
berbasis saham dari pihak yang diakuisisi acquiree or share-based payment
atau pengaturan pembayaran berbasis arrangements of the Group entered into to
saham Grup yang dibuat untuk replace share-based payment arrangements
menggantikan pengaturan pembayaran of the acquirer are measured in accordance
berbasis saham dari pihak yang with PSAK 109 at the acquisition date; and
mengakuisisi diukur berdasarkan PSAK 109
pada tanggal akuisisi; dan
• Aset (atau kelompok lepasan) yang • Assets (or disposal groups) that are
diklasifikasikan sebagai yang dimiliki untuk classified as held for sale in accordance with
dijual berdasarkan PSAK 105 Aset tidak PSAK 105 Non-current Assets Held for Sale
Lancar yang Dikuasai untuk Dijual dan and Discontinued Operations and are
Operasi yang Dihentikan diukur sesuai measured inaccordance with that standard.
dengan standar tersebut.
Goodwill diukur sebagai selisih lebih dari nilai Goodwill is measured as the excess of the sum
gabungan dari imbalan yang dialihkan, jumlah of the consideration transferred, the amount of
setiap kepentingan non-pengendali pada pihak any non-controlling interests in the acquiree,
diakuisisi dan nilai wajar pada tanggal akuisisi and the fair value of the acquirer’s previously
kepentingan ekuitas yang sebelumnya dimiliki held equity interest in the acquire (if any) over
oleh pihak pengakuisisi pada pihak diakuisisi the net of the acquisition-date amounts of the
(jika ada) atas jumlah neto dari aset identifiable assets acquired and the liabilities
teridentifikasi yang diperoleh dan liabilitas yang assumed. If, after the reassessment, the net of
diambilalih pada tanggal akuisisi. Jika, setelah the acquisition-date amounts of the identifiable
penilaian kembali, jumlah neto dari aset assets acquired and liabilities assumed exceeds
teridentifikasi yang diperoleh dan liabilitas yang the sum of the consideration transferred, the
diambilalih pada tanggal akuisisi melebihi amount of any non-controlling interests in the
jumlah imbalan yang dialihkan, jumlah dari acquiree and the fair value of the acquirer’s
setiap kepentingan non-pengendali pada pihak previously held interest in the acquiree (if any),
diakuisisi dan nilai wajar pada tanggal akuisisi the excess is recognized immediately in profit or
kepentingan ekuitas yang sebelumnya dimiliki loss as gain from a bargain purchase.
oleh pihak pengakuisisi pada pihak diakuisisi
(jika ada), selisih lebih diakui segera dalam laba
rugi sebagai pembelian dengan diskon.
- 38 -
Page 43
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
Bila imbalan yang dialihkan oleh Grup dalam When the consideration transferred by the
suatu kombinasi bisnis termasuk aset atau Group in a business combination includes assets
liabilitas yang berasal dari pengaturan imbalan or liabilities resulting from a contingent
kontinjen (contingent consideration consideration arrangement, the contingent
arrangement), imbalan kontinjen tersebut consideration is measured at its acquisition-date
diukur pada nilai wajar pada tanggal akuisisi dan fair value and included as part of the
termasuk sebagai bagian dari imbalan yang consideration transferred in a business
dialihkan dalam suatu kombinasi bisnis. combination.
Perubahan dalam nilai wajar atas imbalan Changes in the fair value of the contingent
kontinjen yang memenuhi syarat sebagai consideration that qualify as measurement
penyesuaian periode pengukuran disesuaikan period adjustments are adjusted
secara retrospektif, dengan penyesuaian terkait retrospectively, with corresponding adjustments
terhadap goodwill. Penyesuaian periode against goodwill. Measurement period
pengukuran adalah penyesuaian yang berasal adjustments are adjustments that arise from
dari informasi tambahan yang diperoleh selama additional information obtained during the
periode pengukuran (yang tidak melebihi satu measurement period (which cannot exceed one
tahun sejak tanggal akuisisi) tentang fakta-fakta year from the acquisition date) about facts and
dan kondisi yang ada pada tanggal akuisisi. circumstances that existed at the acquisition
date.
Perlakuan akuntansi selanjutnya untuk The subsequent accounting for changes in the
perubahan nilai wajar dari imbalan kontinjensi fair value of the contingent consideration that do
yang tidak memenuhi syarat sebagai not qualify as measurement period adjustments
penyesuaian periode pengukuran tergantung depends on how the contingent consideration is
pada bagaimana imbalan kontinjensi classified. Contingent consideration that is
diklasifikasikan. Imbalan kontinjensi yang classified as equity is not remeasured at
diklasifikasikan sebagai ekuitas tidak diukur subsequent reporting dates and its subsequent
kembali pada setiap tanggal pelaporan dan settlement is accounted for within equity. Other
penyelesaian selanjutnya diperhitungkan dalam contingent consideration is remeasured to fair
ekuitas. Imbalan kontinjensi lain diukur ulang ke value at subsequent reporting dates with
nilai wajar pada tanggal pelaporan selanjutnya changes in fair value recognized in profit or loss.
dengan perubahan nilai wajar diakui di laba rugi.
Bila suatu kombinasi bisnis dilakukan secara When a business combination is achieved in
bertahap, kepemilikan terdahulu Grup atas stages, the Group’s previously held equity
pihak terakuisisi diukur kembali ke nilai wajar interest in the acquiree is remeasured to fair
pada tanggal akuisisi dan keuntungan atau value at the acquisition date and the resulting
kerugiannya, jika ada, diakui dalam laba rugi. gain or loss, if any, is recognized in profit or loss.
Jumlah yang berasal dari kepemilikan sebelum Amounts arising from interests in the acquiree
tanggal akuisisi yang sebelumnya telah diakui prior to the acquisition date that have previously
dalam penghasilan komprehensif lain been recognized in other comprehensive income
direklasifikasi ke laba rugi dimana perlakuan are reclassified to profit or loss where such
tersebut akan sesuai jika kepemilikannya treatment would be appropriate if that interests
dilepas/dijual. were disposed of.
Jika akuntansi awal untuk kombinasi bisnis If the initial accounting for a business
belum selesai pada akhir periode pelaporan saat combination is incomplete by the end of the
kombinasi terjadi, Grup melaporkan jumlah reporting period in which the combination
sementara untuk pos-pos yang proses occurs, the Group report provisional amounts for
akuntansinya belum selesai dalam laporan the items for which the accounting is incomplete.
keuangannya. Selama periode pengukuran, Those provisional amounts are adjusted during
pihak pengakuisisi menyesuaikan, aset atau the measurement period, or additional assets or
liabilitas tambahan yang diakui, untuk liabilities are recognized, to reflect new
mencerminkan informasi baru yang diperoleh information obtained about facts and
tentang fakta dan keadaan yang ada pada circumstances that existed as of the acquisition
tanggal akuisisi dan, jika diketahui, akan date that, if known, would have affected the
berdampak pada jumlah yang diakui pada amount recognized as of that date.
tanggal tersebut.
- 39 -
Page 44
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
e. Kombinasi Bisnis Entitas Sepengendali e. Business Combination Under Common
Control
Kombinasi bisnis entitas sepengendali dicatat Business combination of entities under common
dengan menggunakan metode penyatuan control that qualifies as a business are
kepemilikan dimana aset dan liabilitas yang accounted for under pooling of interest method
diperoleh dari kombinasi bisnis dicatat oleh where assets and liabilities acquired in the
pengakuisisi pada jumlah tercatatnya. business combination are recorded by the
acquirer at their book values.
Selisih antara jumlah imbalan yang dialihkan The difference between the transfer price and
dan jumlah tercatat disajikan sebagai tambahan the book value is presented as Additional Paid-in
modal disetor dan tidak diakui ke laba rugi Capital and is not recycled to profit and loss
ketika hilang sepengendalian. when control is lost.
Metode penyatuan kepemilikan diterapkan The pooling of interest method is applied as if
seolah-olah entitas telah bergabung sejak the entities had been combined from the period
periode dimana entitas yang bergabung berada in which the merging entities were placed under
dalam sepengendali. common control.
f. Transaksi dan Penjabaran Laporan f. Foreign Currency Transactions and
Keuangan Dalam Mata Uang Asing Translation
Laporan keuangan individu masing-masing The individual financial statements of each entity
entitas dalam Grup diukur dan disajikan dalam within the Group are measured and presented in
mata uang dari lingkungan ekonomi utama the currency of the primary economic
dimana entitas beroperasi (mata uang environment in which the entity operates (its
fungsional). Laporan keuangan konsolidasian functional currency). The consolidated financial
Grup disajikan dalam mata uang Dollar Amerika statements of the Group are presented in United
Serikat (U.S. Dollar atau US$) yang merupakan States of America Dollar (U.S. Dollar or US$),
mata uang fungsional Perusahaan dan mata which is the functional currency of the Company
uang penyajian untuk laporan keuangan and the presentation currency for the
konsolidasian. consolidated financial statements.
Dalam penyusunan laporan keuangan setiap In preparing the financial statements of each
entitas Grup, transaksi dalam mata uang asing Group entities, transactions in currencies other
selain mata uang fungsional entitas (mata uang than the entity’s functional currency (foreign
asing) diakui pada kurs yang berlaku pada currencies) are recognized at the rates of
tanggal transaksi. Pada setiap akhir periode exchange prevailing at the dates of the
pelaporan, pos moneter dalam valuta asing transactions. At the end of each reporting
dijabarkan kembali pada kurs yang berlaku pada period, monetary items denominated in foreign
tanggal tersebut. Pos-pos non-moneter yang currencies are retranslated at the rates
diukur pada nilai wajar dalam valuta asing prevailing at that date. Non-monetary items
dijabarkan kembali pada kurs yang berlaku pada carried at fair value that are denominated in
tanggal ketika nilai wajar ditentukan. Pos non- foreign currencies are retranslated at the rates
moneter diukur dalam biaya historis dalam prevailing at the date when the fair value was
valuta asing yang tidak dijabarkan kembali. determined. Non-monetary items that are
measured in terms of historical cost in a foreign
currency are not retranslated.
Selisih kurs atas pos moneter diakui dalam laba Exchange differences on monetary items are
rugi pada periode saat terjadinya kecuali untuk: recognized in profit or loss in the period in which
they arise except for:
• Selisih kurs atas pinjaman valuta asing • Exchange differences on foreign currency
yang berkaitan dengan aset dalam borrowing relating to assets under
konstruksi untuk penggunaan yang construction for future productive use,
produktif di masa depan, termasuk dalam which are included in the cost of those
biaya perolehan aset tersebut ketika assets when they are regarded as an
dianggap sebagai penyesuaian atas biaya adjustment to interest costs on those
bunga atas pinjaman dalam valuta asing; foreign currency borrowing;
- 40 -
Page 45
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
• Selisih kurs atas transaksi yang ditetapkan • Exchange differences on transaction
untuk tujuan lindung nilai risiko valuta entered into in order to hedge certain
asing tertentu; dan foreign currency risks; and
• Selisih kurs atas pos moneter piutang atau • Exchange differences on monetary items
utang dari kegiatan usaha luar negeri yang receivable from or payable to a foreign
penyelesaiannya tidak direncanakan atau currency operation for which settlement is
tidak mungkin terjadi (karena membentuk neither planned nor likely to occur
bagian dari investasi bersih dalam kegiatan (therefore forming part of the net
usaha luar negeri), yang pada awalnya investment in the foreign operation), which
diakui pada penghasilan komprehensif lain are recognized initially in other
dan direklasifikasi dari ekuitas ke laba rugi comprehensive income and reclassified
pada pembayaran kembali pos moneter. from equity to profit or loss on repayment
of the monetary items.
• Selisih nilai tukar yang muncul dari • • Exchange differences arising on the
penjabaran kembali pos-pos nonmoneter, retranslation of non-monetary items
di mana keuntungan atau kerugian diakui carried at fair value, of which gains and
dalam penghasilan komprehensif lain. losses are recognized in other
Untuk pos-pos nonmoneter tersebut, setiap comprehensive income. For such non-
keuntungan atau kerugian dari komponen monetary items, any exchange component
pertukaran tersebut juga diakui dalam of that gain or loss is also recognized in
penghasilan komprehensif lain. other comprehensive income.
Untuk tujuan penyajian laporan keuangan For the purposes of presenting these
konsolidasian, aset dan liabilitas kegiatan usaha consolidated financial statements, the assets
luar negeri Grup dijabarkan ke dalam Dollar and liabilities of the Group’s foreign operations
Amerika Serikat dengan menggunakan kurs are translated into U.S. Dollar using exchange
yang berlaku pada akhir periode pelaporan. Pos rates prevailing at the end of each reporting
penghasilan dan beban dijabarkan period. Income and expense items are
menggunakan kurs rata-rata untuk periode translated at the average exchange rates for the
tersebut, kecuali kurs berfluktuasi secara period, unless exchange rates fluctuate
signifikan selama periode tersebut, dalam hal ini significantly during that period, in which case the
kurs yang berlaku pada tanggal transaksi yang exchange rates at the dates of the transactions
digunakan. Selisih kurs yang timbul diakui dalam are used. Exchange differences arising, if any,
penghasilan komprehensif lain dan diakumulasi are recognized in other comprehensive income
dalam ekuitas (dan diatribusikan pada and accumulated in equity (and attributed to
kepentingan non-pengendali). non-controlling interests as appropriate).
Pembukuan entitas anak serta perusahaan The books of accounts of the following
asosiasi berikut ini diselenggarakan dalam mata subsidiaries and associates are maintained in
uang fungsionalnya yaitu Rupiah (Rp): their functional currency, which is the Indonesian
Rupiah (Rp):
• PT Cirebon Power Services,
• PT Cotrans Asia,
• PT Indy Properti Indonesia,
• PT POSB Reksabumi Indonesia,
• PT Indika Digital Teknologi,
• PT Zebra Cross Teknologi,
• PT Xapiens Teknologi Indonesia,
• PT Indika Multi Properti,
• PT Pan Indo Resources,
• PT Mahabharata Dharma Ekatama,
• PT Telaga Mas Kalimantan,
• PT Jaya Bumi Paser,
• PT Diva Perdana Pesona
• PT Trisetia Citagraha (Catatan/Note 14)
• PT Sumber Multi Energi Penajam,
• PT Interport Patimban Agung,
• PT Indika Tenaga Baru,
• PT Empat Mitra Indika Tenaga Surya,
• PT Electra Mobilitas Indonesia,
• PT Solusi Mobilitas Indonesia,
- 41 -
Page 46
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
• PT Ilectra Motor Group,
• PT Electra Distribusi Indonesia,
• PT Electra Auto Indonesia,
• PT Mitra Motor Group,
• PT Foxconn Indika Motor,
• PT Energi Makmur Buana,
• PT Indika Medika Nusantara,
• PT Perkasa Investama Mineral,
• PT Mekko Metal Mining,
• PT Bioneer Indika Group,
• PT Bioneer Indika Diagnostika,
• PT Empat Mitra Indika Mentari,
• PT Kalista Nusa Armada,
• PT Kalista Rotom Orbita,
• PT Kalista Soter Hastia,
• PT Kalista Nayara Dayautama,
• PT Industri Baterai Nusantara,
• PT Manufaktur Teknologi Baterai,
• PT Laras Ekosistem Organik,
• PT Natura Aromatik Nusantara,
• PT Genomik Solidaritas Indonesia dan/and
• PT Kalista Biru Nusantara
g. Transaksi Pihak-Pihak Berelasi g. Transactions with Related Parties
Pihak-pihak berelasi adalah orang atau entitas A related party is a person or entity that is
yang terkait dengan Grup (entitas pelapor): related to the Group (the reporting entity):
a. Orang atau anggota keluarga terdekat a. A person or a close member of that person's
mempunyai relasi dengan entitas pelapor family is related to a reporting entity if that
jika orang tersebut: person:
i. memiliki pengendalian atau i. has control or joint control over the
pengendalian bersama entitas pelapor; reporting entity;
ii. memiliki pengaruh signifikan entitas ii. has significant influence over the
pelapor; atau reporting entity; or
iii. merupakan personil manajemen kunci iii. is a member of the key management
entitas pelapor atau entitas induk dari personnel of the reporting entity or of a
entitas pelapor. parent of the reporting entity.
b. Suatu entitas berelasi dengan entitas b. An entity is related to the reporting entity if
pelapor jika memenuhi salah satu hal any of the following conditions applies:
berikut:
i. Entitas dan entitas pelapor adalah i. The entity, and the reporting entity are
anggota dari kelompok usaha yang members of the same group (which
sama (artinya entitas induk, entitas means that each parent, subsidiary and
anak, dan entitas anak berikutnya fellow subsidiary is related to the others).
terkait dengan entitas lain).
ii. Satu entitas adalah entitas asosiasi ii. One entity is an associate or joint
atau ventura bersama dari entitas lain venture of the other entity (or an
(atau entitas asosiasi atau ventura associate or joint venture of a member
bersama yang merupakan anggota of a group of which the other entity is a
suatu kelompok usaha, yang mana member).
entitas lain tersebut adalah
anggotanya).
iii. Kedua entitas tersebut adalah ventura iii. Both entities are joint ventures of the
bersama dari pihak ketiga yang sama. same third party.
- 42 -
Page 47
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
iv. Satu entitas adalah ventura bersama iv. One entity is a joint venture of a third
dari entitas ketiga dan entitas yang lain entity and the other entity is an
adalah entitas asosiasi dari entitas associate of the third entity.
ketiga.
v. Entitas tersebut adalah suatu program v. The entity is a post-employment benefit
imbalan paska kerja untuk imbalan plan for the benefit of employees of
kerja dari salah satu entitas pelapor either the reporting entity, or an entity
atau entitas yang terkait dengan related to the reporting entity. If the
entitas pelapor. Jika entitas pelapor reporting entity is itself such a plan, the
adalah entitas yang menyelenggarakan sponsoring employers are also related
program tersebut, maka entitas to the reporting entity.
sponsor juga berelasi dengan entitas
pelapor.
vi. Entitas yang dikendalikan atau vi. The entity is controlled or jointly
dikendalikan bersama oleh orang yang controlled by a person identified in (a).
diidentifikasi dalam huruf (a).
vii. Orang yang diidentifikasi dalam huruf vii. A person identified in (a) (i) has
(a) (i) memiliki pengaruh signifikan significant influence over the entity or is
atas entitas atau personil manajemen a member of the key management
kunci entitas (atau entitas induk dari personnel of the entity (or a parent of
entitas). the entity).
viii. Entitas, atau anggota dari kelompok viii. The entity, or any member of a group of
yang mana entitas merupakan bagian which it is a part, provides key
dari kelompok tersebut, menyediakan management personnel services to the
jasa personil manajemen kunci kepada reporting entity or to the parent of the
entitas pelapor atau kepada entitas reporting entity.
induk dari entitas pelapor.
Transaksi signifikan yang dilakukan dengan Significant transactions with related parties,
pihak-pihak berelasi, baik dilakukan dengan whether or not made at similar terms and
kondisi dan persyaratan yang sama dengan conditions as those done with third parties, are
pihak ketiga maupun tidak, diungkapkan pada disclosed in the consolidated financial
laporan keuangan konsolidasian. statements.
h. Instrumen Keuangan h. Financial Instrument
Aset keuangan dan liabilitas keuangan diakui Financial assets and financial liabilities are
pada laporan posisi keuangan konsolidasian recognized on the consolidated statement of
pada saat Grup menjadi salah satu pihak dalam financial position when the Group becomes a
ketentuan kontraktual instrumen tersebut. party to the contractual provisions of the
instrument.
Aset keuangan dan liabilitas keuangan pada Financial assets and financial liabilities are
awalnya diukur pada nilai wajar. Biaya transaksi initially measured at fair value. Transaction costs
yang terkait langsung dengan perolehan atau that are directly attributable to the acquisition or
penerbitan aset keuangan dan liabilitas issue of financial assets and financial liabilities
keuangan ditambahkan atau dikurangkan dari are added to or deducted from the fair value of
nilai wajar aset keuangan dan liabilitas the financial assets and financial liabilities, as
keuangan, jika diperlukan, pada pengakuan appropriate, on initial recognition. Transaction
awal. Biaya transaksi yang dapat diatribusikan costs directly attributable to the acquisition of
secara langsung dengan perolehan aset financial assets or financial liabilities at fair value
keuangan dan liabilitas keuangan pada nilai through profit or loss are recognized
wajar melalui laba rugi diakui langsung pada immediately in profit or loss.
laba rugi.
- 43 -
Page 48
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
Aset keuangan Financial assets
Klasifikasi aset keuangan Classification of financial assets
Instrumen utang selanjutnya diukur pada biaya Debt instruments that meet the following
perolehan diamortisasi, jika memenuhi kedua conditions are subsequently measured at
kondisi berikut ini: amortized cost:
• Aset keuangan dikelola dalam model yang • The financial asset is held within a business
bertujuan untuk memiliki aset keuangan model whose objective is to hold financial
dalam rangka mendapatkan arus kas assets in order to collect contractual cash
kontraktual; dan flows; and
• Persyaratan kontraktual dari aset keuangan • The contractual terms of the financial asset
menghasilkan arus kas pada tanggal give rise on specified dates to cash flows that
tertentu yang semata-mata dari are solely payments of principal and interest
pembayaran pokok dan bunga (“SPPI”) dari (“SPPI”) on the principal amount
jumlah pokok terutang. outstanding.
Instrumen utang selanjutnya diukur pada nilai Debt instruments that meet the following
wajar melalui penghasilan komprehensif lain conditions are subsequently measured at fair
(“FVTOCI”), jika memenuhi kondisi berikut ini: value through other comprehensive income
(“FVTOCI”):
• Aset keuangan dikelola dalam model bisnis • The financial asset is held within a business
yang tujuannya akan tercapai dengan model whose objective is achieved by both
mendapatkan arus kas kontraktual dan collecting contractual cash flows and selling
menjual aset keuangan; dan the financial assets; and
• Persyaratan kontraktual dari aset keuangan • The contractual terms of the financial asset
menghasilkan arus kas pada tanggal give rise on specified dates to cash flows that
tertentu yang semata-mata dari are solely payments of principal and interest
pembayaran pokok dan bunga dari jumlah on the principal amount outstanding.
pokok terutang.
Seluruh aset keuangan lain selanjutnya diukur By default, all other financial assets are
pada nilai wajar melalui laba rugi (“FVTPL”). subsequently measured at fair value through
profit or loss (“FVTPL”).
Meskipun telah disebutkan sebelumnya, Grup Despite the foregoing, the Group may make the
dapat menetapkan pilihan tak terbatalkan pada following irrevocable election/designation at
saat pengakuan awal aset keuangan sebagai initial recognition of a financial asset:
berikut:
• Menyajikan perubahan selanjutnya nilai • To present subsequent changes in fair value
wajar investasi pada instrumen ekuitas of an equity investment in other
dalam penghasilan komprehensif lain jika comprehensive income if certain criteria are
kriteria tertentu dipenuhi; dan met; and
• Menetapkan instrumen utang yang • To designate a debt investment that meets
memenuhi kriteria biaya perolehan the amortized cost or FVTOCI criteria as
diamortisasi atau FVTOCI diukur pada measured at FVTPL if doing so eliminates or
FVTPL, jika penetapan itu mengeliminasi significantly reduces an accounting
atau mengurangi secara signifikan mismatch.
inkonsistensi pengukuran dan pengakuan
(accounting mismatch).
Biaya perolehan diamortisasi dan metode suku Amortized cost and effective interest method
bunga efektif
Metode suku bunga efektif adalah metode yang The effective interest method is a method of
digunakan dalam menghitung biaya perolehan calculating the amortized cost of a debt
instrumen utang dan dalam pengalokasian instrument and of allocating interest income
pendapatan bunga selama periode yang over the relevant period.
relevan.
- 44 -
Page 49
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
Untuk instrumen keuangan selain yang dibeli For financial instruments other than purchased
atau berasal dari aset keuangan memburuk, or originated credit-impaired financial assets,
suku bunga efektif adalah tingkat suku bunga the effective interest rate is the rate that exactly
yang secara tepat mendiskontokan penerimaan discounts estimated future cash receipts
kas masa depan (termasuk semua biaya dan (including all fees and points paid or received
poin yang dibayarkan atau diterima yang that form an integral part of the effective
merupakan bagian yang tidak terpisahkan dari interest rate, transaction costs and other
suku bunga efektif, biaya transaksi dan premi premiums or discounts) excluding expected
atau diskon lainnya) tidak termasuk kerugian credit losses, through the expected life of the
kredit ekspektasian, melalui umur ekspektasian debt instrument, or, where appropriate, a
dari instrumen utang, atau, jika tepat, periode shorter period, to the gross carrying amount of
yang lebih pendek, ke jumlah tercatat bruto the debt instrument on initial recognition. For
instrumen utang pada saat pengakuan awal. purchased or originated credit-impaired financial
Untuk aset keuangan yang dibeli atau yang assets, a credit adjusted effective interest rate is
berasal dari aset keuangan memburuk, suku calculated by discounting the estimated future
bunga efektif yang disesuaikan dengan risiko cash flows, including expected credit losses, to
kredit dihitung dengan mendiskontokan the amortized cost of the debt instrument on
estimasi arus kas masa depan, termasuk initial recognition.
estimasi kerugian kredit, ke biaya perolehan
diamortisasi instrumen utang pada pengakuan
awal.
Biaya perolehan diamortisasi aset keuangan The amortized cost of a financial asset is the
adalah jumlah aset keuangan yang diukur saat amount at which the financial asset is measured
pengakuan awal dikurangi pembayaran pokok, at initial recognition minus the principal
ditambah dengan amortisasi kumulatif repayments, plus the cumulative amortisation
menggunakan metode suku bunga efektif yang using the effective interest method of any
dihitung dari selisih antara nilai awal dan nilai difference between that initial amount and the
jatuh tempo aset keuangan, disesuaikan dengan maturity amount, adjusted for any loss
penyisihan kerugian. Selain itu, jumlah tercatat allowance. On the other hand, the gross carrying
bruto aset keuangan adalah biaya perolehan amount of a financial asset is the amortized cost
diamortisasi sebelum disesuaikan dengan of a financial asset before adjusting for any loss
penyisihan kerugian. allowance.
Pendapatan bunga diakui dengan menggunakan Interest income is recognized using the effective
metode suku bunga efektif untuk instrumen interest method for debt instruments measured
utang yang selanjutnya diukur pada biaya subsequently at amortized cost and at FVTOCI.
perolehan diamortisasi dan pada FVTOCI.
Untuk instrumen keuangan lain, kecuali aset For financial instruments other than purchased
keuangan yang dibeli atau berasal dari aset or originated credit-impaired financial assets,
keuangan memburuk, pendapatan bunga interest income is calculated by applying the
dihitung dengan menerapkan suku bunga efektif effective interest rate to the gross carrying
terhadap jumlah tercatat bruto aset keuangan. amount of a financial asset.
Untuk aset keuangan yang berasal dari aset For financial assets that have subsequently
keuangan memburuk, pendapatan bunga diakui become credit-impaired, interest income is
dengan menerapkan suku bunga efektif recognized by applying the effective interest rate
terhadap biaya perolehan diamortisasi dari aset to the amortized cost of the financial asset. If, in
keuangan tersebut. Jika pada periode pelaporan subsequent reporting periods, the credit risk on
keuangan selanjutnya, risiko kredit aset the credit-impaired financial instrument
keuangan tersebut membaik sehingga aset improves so that the financial asset is no longer
keuangan tidak lagi mengalami penurunan nilai credit-impaired, interest income is recognized by
kredit, maka pendapatan bunga diakui dengan applying the effective interest rate to the gross
menerapkan suku bunga efektif terhadap carrying amount of the financial asset.
jumlah tercatat bruto aset keuangan.
- 45 -
Page 50
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
Untuk aset keuangan yang mengalami For purchased or originated credit-impaired
penurunan nilai kredit yang berasal atau financial assets, the Group recognises interest
berasal, Grup mengakui pendapatan bunga income by applying the credit-adjusted effective
dengan menerapkan suku bunga efektif yang interest rate to the amortized cost of the
disesuaikan dengan kredit ke biaya perolehan financial asset from initial recognition. The
diamortisasi dari aset keuangan sejak calculation does not revert to the gross basis
pengakuan awal. Perhitungan tidak kembali ke even if the credit risk of the financial asset
basis bruto bahkan jika risiko kredit dari aset subsequently improves so that the financial
keuangan selanjutnya membaik sehingga aset asset is no longer credit-impaired.
keuangan tidak lagi mengalami penurunan nilai
kredit.
Pendapatan bunga diakui dalam laba rugi. Interest income is recognized in profit and loss.
Aset Keuangan pada FVTOCI Financial Assets at FVTOCI
Penentuan nilai wajar investasi pada FVTOCI Fair value of investments classified as FVTOCI is
dijelaskan pada Catatan 51. Investasi ini pada determined in the manner described in Note 51.
awalnya diukur pada nilai wajar ditambah Such investments are initially measured at fair
dengan biaya transaksi. Selanjutnya, value plus transaction costs. Subsequently,
perubahan nilai tercatat investasi yang changes in the carrying amount of these
disebabkan oleh keuntungan atau kerugian kurs investments as a result of foreign exchange
mata uang asing (lihat di bawah), kerugian gains and losses (see below), impairment gains
penurunan nilai atau keuntungan (lihat di or losses (see below), and interest income
bawah) dan pendapatan bunga yang dihitung calculated using the effective interest method
menggunakan suku bunga efektif (lihat di atas) (see above) are recognised in profit or loss. The
diakui pada laba rugi. Jumlah yang diakui pada amounts that are recognised in profit or loss are
laba rugi adalah jumlah yang sama dengan the same as the amounts that would have been
jumlah yang akan tercatat dalam laba rugi jika recognised in profit or loss if these investments
investasi ini diukur menggunakan biaya had been measured at amortised cost. All other
perolehan yang diamortisasi. Perubahan lainnya changes in the carrying amount of these
pada nilai tercatat investasi diakui pada investments are recognised in other
pendapatan komprehensif lainnya. Pada saat comprehensive income. When these
investasi dihentikan pengakuannya, investments are derecognised, the cumulative
keuntungan atau kerugian kumulatif yang gains or losses previously recognised in other
sebelumnya diakui pada pendapatan comprehensive income are reclassified to profit
komprehensif lainnya direklasifikasi ke laba rugi. or loss.
Aset keuangan pada FVTPL Financial assets at FVTPL
Aset keuangan yang tidak memenuhi kriteria Financial assets that do not meet the criteria for
yang diukur pada biaya perolehan diamortisasi being measured at amortized cost or FVTOCI are
atau FVTOCI diukur pada FVTPL, khususnya: measured at FVTPL, specifically:
• Investasi dalam instrumen ekuitas • Investments in equity instruments are
diklasifikasi sebagai FVTPL, kecuali Grup classified as at FVTPL, unless the Group
menetapkan investasi ekuitas yang dimiliki designate an equity investment that is
tidak untuk diperdagangkan dan bukan neither held for trading nor a contingent
merupakan imbalan kontinjen dari consideration arising from a business
kombinasi bisnis, sebagai FVTOCI pada combination as at FVTOCI on initial
pengakuan awal. recognition.
- 46 -
Page 51
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
• Instrumen utang yang tidak memenuhi • Debt instruments that do not meet the
kriteria biaya perolehan diamortisasi atau amortized cost criteria or the FVTOCI criteria
FVTOCI, diklasifikasi sebagai FVTPL. Sebagai are classified as at FVTPL. In addition, debt
tambahan, instrumen utang yang memenuhi instruments that meet either the amortized
kriteria biaya perolehan diamortisasi dan cost criteria or the FVTOCI criteria may be
FVTOCI dapat ditetapkan sebagai FVTPL designated as at FVTPL upon initial
pada saat pengakuan awal apabila recognition if such designation eliminates or
penetapan tersebut mengeliminasi atau significantly reduces a measurement or
mengurangi secara signifikan inkonsistensi recognition inconsistency that would arise
pengukuran dan pengakuan yang timbul dari from measuring assets or liabilities or
pengukuran aset atau liabilitas atau recognising the gains and losses on them on
pengakuan keuntungan dan kerugian different bases. The Group have not
dengan basis berbeda. Grup tidak designated any debt instruments as at
menetapkan instrumen utang sebagai FVTPL.
FVTPL.
Aset keuangan pada FVTPL diukur pada nilai Financial assets at FVTPL are measured at fair
wajar pada setiap tanggal pelaporan, dengan value as at each reporting date, with any fair
keuntungan atau kerugian nilai wajar diakui value gains or losses recognized in profit or loss
dalam laba rugi sepanjang bukan merupakan to the extent they are not part of a designated
bagian dari hubungan lindung nilai yang hedging relationship. The net gain or loss
ditetapkan. Keuntungan atau kerugian bersih recognized in profit or loss includes any dividend
yang diakui dalam laba rugi termasuk dividen or interest earned on the financial asset and is
atau bunga yang diperoleh atas aset keuangan included in the “other gains and losses” line
dan dimasukkan dalam pos “keuntungan atau item.
kerugian lain-lain”.
Keuntungan dan kerugian kurs mata uang asing Foreign exchange gains and losses
Jumlah tercatat aset keuangan dalam mata The carrying amount of financial assets that are
uang asing ditentukan dalam mata uang denominated in a foreign currency is determined
tersebut dan dijabarkan dengan menggunakan in that foreign currency and translated at the
kurs spot pada setiap tanggal pelaporan. Secara spot rate as at each reporting date. Specifically:
spesifik:
• Untuk aset keuangan diukur pada biaya • For financial assets measured at amortized
perolehan diamortisasi yang bukan cost that are not part of a designated
merupakan bagian dari hubungan lindung hedging relationship, exchange differences
nilai ditetapkan, selisih kurs diakui dalam are recognized in profit or loss in the “others-
laba rugi pada pos “lain-lain bersih”; net” line item;
• Untuk instrumen utang diukur pada FVTOCI • For debt instruments measured at FVTOCI
yang bukan merupakan bagian dari that are not part of a designated hedging
hubungan lindung nilai ditetapkan, selisih relationship, exchange differences on the
kurs atas biaya perolehan diamortisasi dari amortized cost of the debt instrument are
instrumen hutang diakui dalam laba rugi recognized in profit or loss in the “others-
pada pos “lain-lain bersih”. Perbedaan nilai net” line item. Other exchange differences
tukar lainnya diakui pada pendapatan are recognized in other comprehensive
komprehensif lain dalam cadangan revaluasi income in the investments revaluation
investasi. reserve.
• Untuk aset keuangan diukur pada FVTPL • For financial assets measured at FVTPL that
yang bukan merupakan bagian dari are not part of a designated hedging
hubungan lindung nilai ditetapkan, selisih relationship, exchange differences are
kurs diakui dalam laba rugi pada pos “lain- recognized in profit or loss in the “others-
lain bersih”; dan net” line item; and
• Untuk instrumen ekuitas diukur pada • For equity instruments measured at FVTOCI,
FVTOCI, selisih kurs diakui pada penghasilan exchange differences are recognized in other
komprehensif lain dalam cadangan revaluasi comprehensive income in the investments
investasi. revaluation reserve.
- 47 -
Page 52
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
Lihat kebijakan akuntansi lindung nilai See hedge accounting policy regarding the
mengenai pengakuan perbedaan nilai tukar recognition of exchange differences where the
dimana komponen risiko mata uang asing dari foreign currency risk component of a financial
aset keuangan ditetapkan sebagai instrumen asset is designated as a hedging instrument for
lindung nilai untuk lindung nilai atas risiko mata a hedge of foreign currency risk.
uang asing.
Penurunan nilai aset keuangan Impairment of financial assets
Grup mengakui penyisihan kerugian untuk The Group recognised a loss allowance for
kerugian kredit ekspektasian (“ECL”) atas expected credit losses (“ECL”) on investments in
investasi pada instrumen utang yang diukur debt instruments that are measured at
pada biaya perolehan diamortisasi. Kerugian amortized cost. No impairment loss is recognized
penurunan nilai tidak diakui untuk aset kontrak. for contract assets. The amount of expected
Jumlah kerugian kredit ekspektasian diukur credit losses is updated at each reporting date to
pada setiap tanggal pelaporan untuk reflect changes in credit risk since initial
mencerminkan perubahan dalam risiko kredit recognition of the respective financial
sejak pengakuan awal instrumen keuangan instrument.
tersebut.
Grup selalu mengakui ECL sepanjang umur The Group always recognizes lifetime ECL for
untuk piutang usaha dan aset kontrak. Kerugian trade receivable and contract assets. The
kredit ekspektasian dari aset keuangan tersebut expected credit losses on these financial assets
diestimasi menggunakan matriks provisi are estimated using a provision matrix based on
berdasarkan pengalaman kerugian kredit secara historical credit loss experience of the Group,
historis dari Grup, disesuaikan dengan faktor- adjusted for factors that are specific to the
faktor spesifik terkait debitur, kondisi ekonomi debtors, general economic conditions and an
umum dan penilaian baik atas kondisi sekarang assessment of both the current as well as the
maupun perkiraan arah kondisi pada tanggal forecast direction of conditions at the reporting
pelaporan, termasuk nilai waktu dari uang jika date, including time value of money where
perlu. appropriate.
Untuk semua instrumen keuangan, Grup For all other financial instruments, the Group
mengakui ECL sepanjang umur, bila terdapat recognises lifetime ECL when there has been a
peningkatan risiko kredit sejak pengakuan awal. significant increase in credit risk since initial
Jika, disamping itu, risiko kredit pada instrumen recognition. However, if the credit risk on the
keuangan tidak meningkat secara signifikan financial instrument has not increased
sejak pangakuan awal, Grup mengukur significantly since initial recognition, the Group
penyisihan kerugian untuk instrumen keuangan measures the loss allowance for that financial
sejumlah ECL 12 bulan. instrument at an amount equal to 12-month
ECL.
ECL sepanjang umur merupakan kerugian kredit Lifetime ECL represents the expected credit
ekspektasian yang dihasilkan dari seluruh losses that will result from all possible default
kemungkinan peristiwa gagal bayar selama events over the expected life of a financial
perkiraan umur instrumen keuangan. instrument. In contrast, 12 months ECL
Sebaliknya, ECL 12 bulan merupakan porsi dari represents the portion of lifetime ECL that is
ECL sepanjang umur yang diperkirakan timbul expected to result from default events on a
dari peristiwa gagal bayar instrumen keuangan financial instrument that are possible within
yang mungkin terjadi dalam 12 bulan setelah 12 months after the reporting date.
tanggal pelaporan.
Peningkatan signifikan risiko kredit Significant increase in credit risk
Dalam menilai apakah risiko kredit atas In assessing whether the credit risk on a
instrumen keuangan telah meningkat secara financial instrument has increased significantly
signifikan sejak pengakuan awal, Grup since initial recognition, the Group compare the
membandingkan risiko gagal bayar instrumen risk of a default occurring on the financial
keuangan yang terjadi pada tanggal pelaporan instrument as at the reporting date with the risk
dengan risiko gagal bayar pada saat pengakuan of a default occurring on the financial instrument
awal. Dalam melakukan penilaian, Grup as at the date of initial recognition. In making
mempertimbangkan baik informasi kuantitatif this assessment, the group considers both
maupun informasi kualitatif yang wajar dan quantitative and qualitative information that is
terdukung, termasuk pengalaman historis dan reasonable and supportable, including historical
- 48 -
Page 53
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
informasi bersifat perkiraan masa depan, yang experience and forward looking information that
tersedia tanpa biaya atau upaya berlebihan. is available without undue cost or effort.
Secara khusus, informasi berikut ini In particular, the following information is taken
diperhitungkan ketika menilai apakah risiko into account when assessing whether credit risk
kredit telah meningkat secara signifikan sejak has increased significantly since initial
pengakuan awal: recognition:
• penurunan signifikan aktual atau yang • an actual or expected significant
diharapkan pada peringkat instrumen deterioration in the financial instrument’s
keuangan eksternal (jika tersedia) atau external (if available) or internal credit
kredit internal; rating;
• penurunan signifikan dalam indikator pasar • significant deterioration in external market
eksternal risiko kredit untuk instrumen indicators of credit risk for a particular
keuangan tertentu, mis. peningkatan yang financial instrument, e.g. a significant
signifikan dalam spread kredit, harga swap increase in the credit spread, the credit
default kredit untuk debitur, atau lamanya default swap prices for the debtor, or the
waktu atau sejauh mana nilai wajar dari aset length of time or the extent to which the fair
keuangan kurang dari biaya diamortisasi; value of a financial asset has been less than
its amortized cost;
• perubahan merugikan yang ada atau yang • existing or forecast adverse changes in
diperkirakan dalam kondisi bisnis, business, financial or economic conditions
keuangan, atau ekonomi yang diperkirakan that are expected to cause a significant
akan menyebabkan penurunan signifikan decrease in the debtor’s ability to meet its
dalam kemampuan debitur untuk memenuhi debt obligations;
kewajiban utangnya;
• penurunan signifikan aktual atau yang • an actual or expected significant
diharapkan dalam hasil operasi debitur; deterioration in the operating results of the
debtor;
• peningkatan risiko kredit yang signifikan • significant increases in credit risk on other
pada instrumen keuangan lain dari debitur financial instruments of the same debtor;
yang sama; dan and
• perubahan merugikan signifikan aktual atau • an actual or expected significant adverse
yang diharapkan dalam lingkungan change in the regulatory, economic, or
peraturan, ekonomi, atau teknologi dari technological environment of the debtor that
debitur yang menghasilkan penurunan results in a significant decrease in the
signifikan dalam kemampuan debitur untuk debtor’s ability to meet its debt obligations.
memenuhi kewajiban utangnya.
Terlepas dari hasil penilaian di atas, Grup Irrespective of the outcome of the above
mengasumsikan bahwa risiko kredit pada aset assessment, the Group presumes that the credit
keuangan telah meningkat secara signifikan risk on a financial asset has increased
sejak pengakuan awal ketika pembayaran significantly since initial recognition when
kontrak lebih dari 30 hari lewat jatuh tempo, contractual payments are more than 30 days
kecuali jika Grup memiliki alasan yang masuk past due, unless the Group has reasonable and
akal dan dapat didukung informasi yang supportable information that demonstrates
menunjukkan sebaliknya. otherwise.
Meskipun demikian, Grup mengasumsikan Despite the foregoing, the Group assumes that
bahwa risiko kredit pada instrumen keuangan the credit risk on a financial instrument has not
tidak meningkat secara signifikan sejak increased significantly since initial recognition if
pengakuan awal jika instrumen keuangan the financial instrument is determined to have
tersebut ditetapkan memiliki risiko kredit yang low credit risk at the reporting date. A financial
rendah pada tanggal pelaporan. Instrumen instrument is determined to have low credit risk
keuangan ditetapkan memiliki risiko kredit if:
rendah jika:
a. instrumen keuangan memiliki risiko gagal a. the financial instrument has a low risk of
bayar yang rendah; default;
- 49 -
Page 54
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
b. debitur memiliki kapasitas yang kuat untuk b. the debtor has a strong capacity to meet its
memenuhi kewajiban arus kas contractual cash flow obligations in the near
kontraktualnya dalam waktu dekat; dan term; and
c. perubahan yang merugikan dalam kondisi c. adverse changes in economic and business
ekonomi dan bisnis dalam jangka panjang conditions in the longer term may, but will
dapat, tetapi tidak harus, mengurangi not necessarily, reduce the ability of the
kemampuan peminjam untuk memenuhi borrower to fulfil its contractual cash flow
kewajiban arus kas kontraktualnya. obligations.
Grup menganggap aset keuangan memiliki The Group considers a financial asset to have low
risiko kredit rendah ketika aset memiliki credit risk when the asset has external credit
peringkat kredit eksternal 'peringkat investasi' rating of ‘investment grade’ in accordance with
sesuai dengan definisi yang dipahami secara the globally understood definition or if an
global atau jika peringkat eksternal tidak external rating is not available, the asset has an
tersedia, aset tersebut memiliki peringkat internal rating of ‘performing’. Performing
internal 'performing'. Performing berarti bahwa means that the counterparty has a strong
rekanan memiliki posisi keuangan yang kuat financial position and there is no past due
dan tidak ada jumlah yang lewat jatuh tempo. amounts.
Grup secara teratur memantau keefektifan The Group regularly monitors the effectiveness
kriteria yang digunakan untuk mengidentifikasi of the criteria used to identify whether there has
apakah telah ada peningkatan risiko kredit yang been a significant increase in credit risk and
signifikan untuk memastikan bahwa kriteria revises them as appropriate to ensure that the
tersebut mampu mengidentifikasi peningkatan criteria are capable of identifying significant
risiko kredit yang signifikan sebelum jumlahnya increase in credit risk before the amount
jatuh tempo. becomes past due.
Definisi gagal bayar Definition of default
Grup mempertimbangkan informasi yang The Group considers Information developed
dikembangkan secara internal atau diperoleh internally or obtained from external sources
dari sumber eksternal menunjukkan bahwa indicates that the debtor is unlikely to pay its
debitur tidak mungkin membayar krediturnya, creditors, including the Group, in full (without
termasuk Grup, secara penuh (tanpa taking into account any collateral held by the
memperhitungkan agunan yang dipegang oleh Group) as constituting an event of default for
Grup) sebagai sebuah peristiwa yang internal credit risk management purposes as
menegaskan peristiwa gagal bayar sehubungan historical experience indicates that financial
dengan tujuan manajemen risiko kredit internal assets are generally not recoverable.
karena pengalaman historis menunjukkan
bahwa aset keuangan tersebut umumnya tidak
dapat dipulihkan.
Terlepas dari analisis di atas, Grup menganggap Irrespective of the above analysis, the Group
bahwa default telah terjadi ketika aset considers that default has occurred when a
keuangan telah lewat lebih dari 90 hari, kecuali financial asset is more than 90 days past due
jika Grup memiliki informasi yang masuk akal unless the Group has reasonable and
dan dapat didukung untuk menunjukkan bahwa supportable information to demonstrate that a
kriteria default yang lebih lambat lebih tepat. more lagging default criterion is more
appropriate.
Aset keuangan yang mengalami penurunan nilai Credit-impaired financial assets
kredit
Aset keuangan mengalami penurunan nilai A financial asset is credit-impaired when one or
kredit ketika satu atau lebih peristiwa yang more events that have a detrimental impact on
memiliki dampak buruk pada estimasi arus kas the estimated future cash flows of that financial
masa depan dari aset keuangan tersebut telah asset have occurred. Evidence that a financial
terjadi. Bukti bahwa aset keuangan mengalami asset is credit-impaired includes observable data
penurunan nilai termasuk data yang dapat about the following events:
diobservasi tentang peristiwa berikut:
• kesulitan keuangan yang signifikan dari • significant financial difficulty of the issuer or
penerbit atau peminjam the borrower
- 50 -
Page 55
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
• pelanggaran kontrak, seperti kejadian • a breach of contract, such as a default or past
default atau lewat jatuh tempo due event
• pemberi pinjaman peminjam, karena alasan • the lender(s) of the borrower, for economic
ekonomi atau kontrak terkait dengan or contractual reasons relating to the
kesulitan keuangan peminjam borrower’s financial difficulty
• telah memberikan kepada peminjam suatu • having granted to the borrower a
konsesi yang tidak akan dipertimbangkan concession(s) that the lender(s) would not
oleh pemberi pinjaman otherwise consider
• menjadi mungkin bahwa peminjam akan • it is becoming probable that the borrower will
mengalami kebangkrutan atau reorganisasi enter bankruptcy or other financial
keuangan lainnya reorganisation
• hilangnya pasar aktif untuk aset keuangan • the disappearance of an active market for
itu karena kesulitan keuangan. that financial asset because of financial
difficulties.
Kebijakan penghapusan Write-off policy
Grup menghapus aset keuangan ketika terdapat The Group writes off a financial asset when there
informasi yang mengindikasikan bahwa debitur is information indicating that the debtor is in
dalam kesulitan keuangan yang parah dan tidak severe financial difficulty and there is no realistic
ada prospek pemulihan yang realistis, mis. prospect of recovery, e.g. when the debtor has
ketika debitur telah ditempatkan dalam likuidasi been placed under liquidation or has entered into
atau telah memasuki proses kebangkrutan. Aset bankruptcy proceedings. Financial assets written
keuangan yang dihapusbukukan masih dapat off may still be subject to enforcement activities
dikenakan kegiatan penegakan hukum under the Group’s recovery procedures, taking
berdasarkan prosedur pemulihan Grup, dengan into account legal advice where appropriate. Any
mempertimbangkan nasihat hukum yang recoveries made are recognized in profit or loss.
sesuai. Setiap pemulihan yang dilakukan diakui
dalam laba rugi.
Pengukuran dan pengakuan atas kerugian kredit Measurement and recognition of expected credit
yang diharapkan losses
Pengukuran kerugian kredit yang diharapkan The measurement of expected credit losses is a
adalah fungsi dari probabilitas default, loss function of the probability of default, loss given
diberikan default (mis. besarnya kerugian jika default (i.e. the magnitude of the loss if there is
ada default) dan eksposur pada default. a default) and the exposure at default. The
Penilaian probabilitas default dan kerugian yang assessment of the probability of default and loss
diberikan default didasarkan pada data historis given default is based on historical data adjusted
yang disesuaikan dengan informasi berwawasan by forward-looking information as described
ke depan seperti dijelaskan di atas. Adapun above. As for the exposure at default, for
eksposur pada default, untuk aset keuangan, ini financial assets, this is represented by the
diwakili oleh jumlah tercatat bruto aset pada assets’ gross carrying amount at the reporting
tanggal pelaporan; untuk kontrak jaminan date; for financial guarantee contracts, the
keuangan, eksposur mencakup jumlah yang exposure includes the amount drawn down as at
ditarik pada tanggal pelaporan, bersama the reporting date, together with any additional
dengan jumlah tambahan yang diperkirakan amounts expected to be drawn down in the
akan ditarik di masa depan dengan tanggal future by default date determined based on
default yang ditentukan berdasarkan tren historical trend, the Group’s understanding of
historis, pemahaman Grup tentang pembiayaan the specific future financing needs of the
masa depan yang spesifik kebutuhan debitur, debtors, and other relevant forward-looking
dan informasi berwawasan ke depan lainnya information.
yang relevan.
Untuk aset keuangan, kerugian kredit For financial assets, the expected credit loss is
ekspektasian merupakan selisih antara arus kas estimated as the difference between all
kontraktual yang jatuh tempo kepada Grup contractual cash flows that are due to the Group
sesuai dengan kontrak, dan arus kas yang in accordance with the contract and all the cash
diperkirakan akan diterima Grup, didiskontokan flows that the Group expect to receive,
dengan suku bunga efektif awal. discounted at the original effective interest rate.
Apabila kerugian kredit ekspektasian sepanjang Where lifetime ECL is measured on a collective
umur diukur secara kolektif untuk memenuhi basis to cater for cases where evidence of
dimana bukti kenaikan signifikan risiko kredit significant increases in credit risk at the
- 51 -
Page 56
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
pada level instrumen invidual tidak tersedia, individual instrument level may not yet be
dalam hal ini instrumen keuangan available, the financial instruments are grouped
dikelompokkan dengan dasar sebagai berikut: on the following basis:
• Jenis instrumen keuangan (piutang usaha, • Nature of financial instruments (i.e. the
piutang lain-lain, piutang sewa pembiayaan, Group’s trade and other receivables, finance
investasi dalam convertible promissory lease receivables, investment in convertible
notes dan jumlah tagihan kepada pelanggan promissory notes and amounts due from
yang masing-masing dinilai sebagai grup customers are each assessed as a separate
terpisah. Piutang pihak berelasi yang dinilai group. Loans to related parties are assessed
untuk kerugian kredit ekspektasian atas for expected credit losses on an individual
dasar individual); basis);
• Status jatuh tempo; • Past-due status;
• Sifat, besaran dan jenis industri debitur; • Nature, size and industry of debtors;
• Sifat jaminan untuk piutang sewa • Nature of collaterals for finance lease
pembiayaan; dan receivables; and
• Peringkat risiko kredit jika tersedia. • External credit ratings where available.
Pengelompokan ditelaah secara teratur oleh The grouping is regularly reviewed by
manajemen untuk memastikan setiap kelompok management to ensure the constituents of each
mempunyai karakteristik risiko yang sama. group continue to share similar credit risk
characteristics.
Jika Grup mengukur penyisihan kerugian If the Group have measured the loss allowance
instrumen keuangan pada jumlah yang sama for a financial instrument at an amount equal to
dengan kerugian kredit ekspektasian sepanjang lifetime ECL in the previous reporting period, but
umur periode pelaporan sebelumnya, namun determines at the current reporting date that the
menentukan bahwa untuk periode sekarang, conditions for lifetime ECL are no longer met, the
kondisi kerugian kredit ekspektasian sepanjang Group measure the loss allowance at an amount
umur tidak terpenuhi lagi, maka Grup mengukur equal to 12 months ECL at the current reporting
penyisihan kerugian pada jumlah yang sama date.
dengan kerugian kredit ekspektasian 12 bulan
pada periode pelaporan berjalan.
Grup mengakui keuntungan atau kerugian The Group recognise an impairment gain or loss
penurunan nilai dalam laba rugi untuk semua in profit or loss for all financial instruments with
instrumen keuangan dengan menyesuaikan a corresponding adjustment to their carrying
jumlah tercatat melalui akun penyisihan amount through a loss allowance.
kerugian.
Penghentian pengakuan aset keuangan Derecognition of financial assets
Grup menghentikan pengakuan aset keuangan The Group derecognise a financial asset only
hanya jika hak kontraktual atas arus kas yang when the contractual rights to the cash flows
berasal dari aset keuangan berakhir, atau aset from the asset expire, or when it transfers the
keuangan dialihkan dan secara substansial financial asset and substantially all the risks and
seluruh risiko dan manfaat atas kepemilikan rewards of ownership of the asset to another
aset keuangan dialihkan ke pihak lain. Jika Grup party. If the Group neither transfer nor retain
tidak mentransfer atau menahan secara substantially all the risks and rewards of
substansial seluruh risiko dan manfaat atas ownership and continues to control the
kepemilikan dan mempertahankan transferred asset, the Group recognise their
pengendalian atas aset yang ditransfer, maka retained interest in the asset and an associated
Grup mengakui hak dalam aset yang ditahan liability for amounts it may have to pay. If the
dan mengakui kewajiban sebesar jumlah yang Group retain substantially all the risks and
mungkin harus dibayar. Jika Grup menahan rewards of ownership of a transferred financial
secara substansil seluruh risiko dan manfaat asset, the Group continues to recognise the
atas pemilikan aset keuangan yang ditransfer, financial asset and also recognises a
maka Grup tetap mengakui aset keuangan dan collateralised borrowing for the proceeds
juga mengakui pinjaman terjamin sebesar dana received.
diterima.
Pada penghentian pengakuan aset keuangan On derecognition of a financial asset measured
yang diukur pada biaya perolehan diamortisasi, at amortized cost, the difference between the
selisih antara jumlah tercatat aset dan jumlah asset’s carrying amount and the sum of the
pembayaran diterima dan piutang diakui dalam consideration received and receivable is
laba rugi. recognized in profit or loss.
- 52 -
Page 57
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
Liabilitas Keuangan dan Instrumen Financial Liabilities and Equity Instruments
Ekuitas
Klasifikasi sebagai utang atau ekuitas Classification as debt or equity
Instrumen utang atau ekuitas yang diterbitkan Debt and equity instruments issued by the Group
oleh Grup direklasifikasi sebagai liabilitas are classified as either financial liabilities or as
keuangan atau ekuitas sesuai substansi equity in accordance with the substance of the
pengaturan kontraktual dan sesuai dengan contractual arrangements and the definitions of
definisi dari liabilitas keuangan dan instrumen a financial liability and an equity instrument.
ekuitas.
Instrumen ekuitas Equity instruments
Instrumen ekuitas adalah setiap kontrak yang An equity instrument is any contract that
membuktikan hak residual dalam aset suatu evidences a residual interest in the assets of an
entitas setelah dikurangi dengan seluruh entity after deducting all of its liabilities. Equity
liabilitasnya. Instrumen ekuitas yang instruments issued by a group entity are
diterbitkan suatu grup entitas diakui sebesar recognized at the proceeds received, net of
dana diterima, setelah dikurangi biaya direct issue costs.
langsung penerbitannya.
Pembelian kembali instrumen ekuitas sendiri Repurchase of the company’s own equity
diakui dan dikurangkan langsung dalam instruments is recognized and deducted directly
ekuitas. Tidak ada keuntungan atau kerugian in equity. No gain or loss is recognized in profit
diakui dalam laba rugi atas pembelian, or loss on the purchase, sale, issue or
penjualan, penerbitan atau pembatalan cancellation of the company’s own equity
instrumen ekuitas sendiri. instruments.
Instrumen keuangan majemuk Compound instruments
Bagian komponen instrumen keuangan The component parts of compound instruments
majemuk (pinjaman konversi) yang diterbitkan (convertible loans) issued by the Group are
oleh Grup diklasifikasikan secara terpisah classified separately as financial liabilities and
sebagai liabilitas keuangan dan instrumen equity in accordance with the substance of the
ekuitas sesuai dengan substansi perjanjian contractual arrangements and the definitions of
kontraktual dan definisi liailitas keuangan dan a financial liability and an equity instrument. A
instrument keuangan. Opsi konversi yang akan conversion option that will be settled by the
diselesaikan dengan pertukaran sejumlah kas exchange of a fixed amount of cash or another
atau asset keuangan lainnya untuk sejumlah financial asset for a fixed number of the Group’s
instrument ekuitas Grup yang telah ditetapkan own equity instruments is an equity instrument.
merupakan instrumen ekuitas.
Pada tanggal penerbitan, nilai wajar komponen At the date of issue, the fair value of the liability
liabilitas diestimasikan menggunakan suku component is estimated using the prevailing
Bunga pasar yang berlaku untuk instrumen market interest rate for similar non-convertible
non-konversi serupa. Jumlah ini dicatat sebagai instruments. This amount is recorded as a
liabilitas dengan dasar biaya diamortisasi liability on an amortized cost basis using the
menggunakan metode suku bunga efektif effective interest method until extinguished
sampai dihentikan pengakuannya pada saat upon conversion or at the instrument’s maturity
konversi atau pada tanggal jatuh tempo date.
instrumen.
Opsi konversi yang diklasifikasikan sebagai A conversion option classified as equity is
instrumen ekuitas ditentukan dengan determined by deducting the amount of the
mengurangkan jumlah komponen liabilitas dari liability component from the fair value of the
nilai wajar instrumen majemuk secara compound instrument as a whole. This is
keseluruhan. Jumlah ini diakui dan dicatat recognized and included in equity, net of income
dalam ekuitas, neto setelah dampak pajak tax effects, and is not subsequently remeasured.
penghasilan, dan selanjutnya tidak diukur In addition, the conversion option classified as
ulang. Sebagai tambahan, opsi konversi yang equity will remain in equity until the conversion
diklasifikasikan sebagai instrumen ekuitas akan option is exercised, in which case, the balance
tetap di dalam ekuitas hingga opsi konversi recognized in equity will be transferred to
belum dieksekusi, dalam kasus tersebut, “additional paid-in capital”. Where the
- 53 -
Page 58
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
jumlah yang diakui di ekuitas akan dialihkan ke conversion option remains unexercised at the
“tambahan modal disetor”. Ketika opsi konversi maturity date of the convertible notes, the
masih tidak dieksekusi pada tanggal jatuh balance recognized in equity will be transferred
tempo obligasi konversi, jumlah yang diakui di to retained earnings/others equity. No gain or
ekuitas akan dialihkan ke saldo laba/cadangan loss is recognized in profit or loss upon
lainnya. Tidak ada keuntungan atau kerugian conversion or expiration of the conversion
yang diakui di laba rugi pada saat konversi atau option.
kadaluarsa opsi konversi.
Biaya transaksi yang berasal dari penerbitan Transaction costs that relate to the issue of the
pinjaman konversi dialokasikan ke liabilitas dan convertible loans are allocated to the liability and
komponen ekuitas sebesar proporsi terhadap equity components in proportion to the
alokasi hasil bruto. Biaya transaksi terkait allocation of the gross proceeds. Transaction
komponen ekuitas diakui secara langsung di costs relating to the equity component are
ekuitas. Biaya transaksi terkait komponen recognized directly in equity. Transaction costs
liabilitas diperhitungkan dalam jumlah tercatat relating to the liability component are included
komponen liabilitas dan diamortisasi sepanjang in the carrying amount of the liability component
umur obligasi konversi menggunakan metode and are amortized over the lives of the
suku bunga efektif. convertible notes using the effective interest
method.
Liabilitas keuangan Financial liabilities
Semua liabilitas keuangan selanjutnya diukur All financial liabilities are subsequently
pada biaya perolehan diamortisasi measured at amortized cost using the effective
menggunakan metode suku bunga efektif atau interest method or at FVTPL.
diukur pada FVTPL.
Namun, liabilitas keuangan yang timbul ketika However, financial liabilities that arise when a
pengalihan aset keuangan tidak memenuhi transfer of a financial asset does not qualify for
syarat untuk penghentian pengakuan atau derecognition or when the continuing
ketika pendekatan keterlibatan berkelanjutan involvement approach applies, and financial
berlaku, dan kontrak jaminan keuangan yang guarantee contracts issued by the Group, are
dikeluarkan oleh Grup, diukur sesuai dengan measured in accordance with the specific
kebijakan akuntansi khusus yang dijabarkan di accounting policies set out below.
bawah ini.
Liabilitas keuangan pada FVTPL Financial liabilities at FVTPL
Liabilitas keuangan diklasifikasi FVTPL ketika Financial liabilities are classified as at FVTPL
liabilitas keuangan 1) imbalan kontinjen yang when the financial liability is 1) contingent
diakui oleh pihak pengakuisisi dalam kombinasi consideration of an acquirer in a business
bisnis ketika PSAK 103 diterapkan, 2) dimiliki combination to which PSAK 103 applies, 2) held
untuk diperdagangkan, atau 3) ditetapkan for trading, or 3) it is designated as at FVTPL.
sebagai FVTPL.
Liabilitas keuangan diklasifikasi sebagai dimiliki A financial liability is classified as held for trading
untuk diperdagangkan jika: if:
• Diperoleh terutama untuk dijual kembali • It has been acquired principally for the
dalam waktu dekat; atau purpose of repurchasing it in the near term;
or
• Pada pengakuan awal merupakan bagian • On initial recognition it is part of a portfolio
portofolio instrumen keuangan tertentu of identified financial instruments that the
yang dikelola bersama dan terdapat bukti Group manages together and has a recent
pola aktual terkini ambil untung jangka actual pattern of short-term profit-taking; or
pendek; atau
- 54 -
Page 59
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
• Merupakan derivatif, kecuali derivatif yang • It is a derivative, except for a derivative that
merupakan kontrak jaminan keuangan atau is a financial guarantee contract or a
instrumen lindung nilai yang ditetapkan dan designated and effective hedging instrument.
efektif.
Liabilitas keuangan selain liabilitas keuangan A financial liability other than a financial liability
dimiliki untuk diperdagangkan atau imbalan held for trading or contingent consideration of an
kontinjen dari pihak pengakuisisi dalam acquirer in a business combination may be
kombinasi bisnis dapat ditetapkan sebagai designated as at FVTPL upon initial recognition
FVTPL saat pengakuan awal jika: if:
• Penetapan tersebut mengeliminasi atau • Such designation eliminates or significantly
secara signifikan mengurangi inkonsistensi reduces a measurement or recognition
pengukuran atau pengakuan; atau inconsistency that would otherwise arise; or
• Liabilitas keuangan merupakan bagian dari • The financial liability forms part of a group of
kelompok aset keuangan atau liabilitas financial assets or financial liabilities or both,
keuangan atau keduanya, yang dikelola dan which is managed and its performance is
kinerjanya dievaluasi berdasarkan nilai evaluated on a fair value basis, in accordance
wajar, sesuai dengan manajemen risiko atau with the Group’s documented risk
strategi investasi terdokumentasi, dan management or investment strategy, and
informasi tentang pengelompokan information about the Grouping is provided
disediakan secara internal atas dasar itu; internally on that basis; or
atau
• Merupakan bagian kontrak yang • It forms part of a contract containing one or
mengandung satu atau lebih derivatif more embedded derivatives, and PSAK 109
melekat, dan PSAK 109 mengijinkan seluruh permits the entire combined contract to be
kontrak gabungan ditetapkan sebagai designated as at FVTPL.
FVTPL.
Pengukuran selanjutnya liabilitas keuangan pada Subsequent measurement of financial liabilities
FVTPL at FVTPL
Liabilitas keuangan di FVTPL diukur pada nilai Financial liabilities at FVTPL were measured at
wajar, dengan keuntungan atau kerugian yang fair value, with any gains or losses arising on
timbul atas perubahan nilai wajar diakui dalam changes in fair value recognized in profit or loss
laporan laba rugi sepanjang hal tersebut tidak to the extented that they are not part of a
menjadi bagian dari hubungan lindung nilai yang designated hedging relationship (see Hedge
ditentukan (lihat Kebijakan akuntansi lindung accounting policy). The net gain or loss
nilai). Keuntungan atau kerugian bersih yang recognized in profit or loss incorporates any
diakui dalam laba rugi menggabungkan setiap interest paid on the financial liability and is
bunga yang dibayarkan atas liabilitas keuangan included in the “other gains and losses” line item
dan termasuk dalam bagian “keuntungan dan (Note 45) in profit or loss.
kerugian lain-lain” (Catatan 45) dalam laporan
laba rugi.
Namun, untuk liabilitas keuangan yang However, for financial liabilities that are
ditetapkan pada FVTPL, jumlah perubahan nilai designated as at FVTPL, the amount of change
wajar liabilitas keuangan yang dapat in the fair value of the financial liability that is
diatribusikan pada perubahan risiko kredit attributable to changes in the credit risk of that
liabilitas tersebut diakui dalam pendapatan liability is recognised in other comprehensive
komprehensif lain, kecuali pengakuan dampak income, unless the recognition of the effects of
dari liabilitas keuangan tersebut, perubahan changes in the liability’s credit risk in other
risiko kredit liabilitas dalam pendapatan comprehensive income would create or enlarge
komprehensif lain akan menciptakan atau an accounting mismatch in profit or loss. The
memperbesar ketidaksesuaian akuntansi dalam remaining amount of change in the fair value of
laba rugi. Sisa perubahan dari nilai wajar atas liability is recognized in profit or loss. Changes
liabilitas akan diakui dalam laporan laba rugi. in fair value attributable to a financial liability’s
Perubahan nilai wajar yang dapat diatribusikan credit risk that are recognised in other
pada risiko kredit liabilitas keuangan diakui comprehensive income are not subsequently
dalam pendapatan komprehensif lain tidak reclassified to profit or loss; instead, they are
- 55 -
Page 60
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
kemudian direklasifikasi ke laba rugi; transferred to retained earnings upon
sebaliknya, perubahan tersebut dipindahkan ke derecognition of the financial liability.
saldo laba pada saat penghentian pengakuan
liabilitas keuangan.
Liabilitas keuangan diukur pada biaya perolehan Financial liabilities measured at amortized cost
yang diamortisasi
Liabilitas keuangan yang bukan merupakan Financial liabilities that are not 1) contingent
1) imbalan kontinjen dari pihak pengakuisisi consideration of an acquirer in a business
dalam kombinasi bisnis, 2) dimiliki untuk combination, 2) held-for-trading, or
diperdagangkan, atau 3) ditetapkan sebagai 3) designated as at FVTPL, are subsequently
FVTPL, selanjutnya diukur pada biaya perolehan measured at amortized cost using the effective
diamortisasi dengan menggunakan metode suku interest method.
bunga efektif.
Metode suku bunga efektif Effective interest method
Metode suku bunga efektif merupakan suatu The effective interest method is a method of
metode penghitungan biaya perolehan calculating the amortized cost of a financial
diamortisasi dari liabilitas keuangan dan liability and of allocating interest expense over
pengalokasian beban bunga selama periode the relevant period. The effective interest rate is
yang relevan. Suku bunga efektif adalah suku the rate that exactly discounts estimated future
bunga yang secara tepat mendiskontokan cash payments (including all fees and points paid
estimasi pembayaran kas masa depan or received that form an integral part of the
(termasuk imbalan dan komisi dibayar atau effective interest rate, transaction costs and
diterima yang merupakan bagian tidak other premiums or discounts) through the
terpisahkan dari suku bunga efektif, biaya expected life of the financial liability, or (where
transaksi dan seluruh premi dan diskonto appropriate) a shorter period, to the amortized
lainnya) selama umur dari liabilitas keuangan, cost of a financial liability.
atau (jika perlu) selama periode lebih pendek,
dengan biaya diamortisasi dari liabilitas
keuangan.
Keuntungan dan kerugian kurs mata uang asing Foreign exchange gains and losses
Untuk liabilitas keuangan dalam mata uang For financial liabilities that are denominated in a
asing dan diukur pada biaya perolehan foreign currency and are measured at amortized
diamortisasi pada setiap tanggal pelaporan, cost as at each reporting date, the foreign
keuntungan atau kerugian kurs mata uang asing exchange gains and losses are determined based
ditentukan berdasarkan biaya perolehan on the amortized cost of the instruments. These
diamortisasi dari instrumen. Keuntungan atau foreign exchange gains and losses are
kerugian kurs mata uang asing diakui dalam recognized in profit or loss for financial liabilities
laba rugi untuk liabilitas keuangan yang tidak that are not part of a designated hedging
merupakan bagian dari hubungan lindung nilai relationship. For those which are designated as
ditetapkan. Bagi mereka yang ditetapkan a hedging instrument for a hedge of foreign
sebagai instrumen lindung nilai untuk lindung currency risk, foreign exchange gains and losses
nilai atas risiko mata uang asing, keuntungan are recognized in other comprehensive income
dan kerugian selisih kurs diakui dalam and accumulated in a separate component of
pendapatan komprehensif lain dan equity.
diakumulasikan dalam komponen ekuitas yang
terpisah.
Nilai wajar liabilitas keuangan dalam mata uang The fair value of financial liabilities denominated
asing ditentukan dalam mata uang asing in a foreign currency is determined in that
tersebut dan dijabarkan pada kurs yang berlaku foreign currency and translated at the spot rate
pada akhir periode pelaporan. Untuk liabilitas at the end of the reporting period. For financial
keuangan yang diukur pada FVTPL, komponen liabilities that are measured as at FVTPL, the
nilai tukar mata uang asing merupakan bagian foreign exchange component forms part of the
dari keuntungan atau kerugian nilai wajar dan fair value gains or losses and is recognized in
diakui dalam laba rugi untuk liabilitas keuangan profit or loss for financial liabilities that are not
yang tidak merupakan bagian dari hubungan part of a designated hedging relationship.
lindung nilai ditetapkan.
- 56 -
Page 61
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
Penghentian pengakuan liabilitas keuangan Derecognition of financial liabilities
Grup menghentikan pengakuan liabilitas The Group derecognises financial liabilities
keuangan, jika dan hanya jika, liabilitas when, and only when, the financial liabilities are
keuangan tersebut dilepaskan, dibatalkan atau discharged, cancelled or they expire. The
kadaluarsa. Selisih antara jumlah tercatat difference between the carrying amount of the
liabilitas keuangan yang dihentikan financial liability derecognized and the
pengakuannya dan imbalan yang dibayarkan, consideration paid, including any non-cash
termasuk aset nonkas yang ditransfer atau assets transferred or liabilities assumed, is
liabilitas yang ditanggung, diakui dalam laba rugi. recognized in profit or loss.
Ketika Grup bertukar dengan pemberi pinjaman When the Group exchanges with the existing
yang ada, satu instrumen utang menjadi lender one debt instrument into another one
instrumen lain dengan persyaratan yang with the substantially different terms, such
berbeda secara substansial, pertukaran tersebut exchange is accounted for as an extinguishment
dicatat sebagai pelunasan liabilitas keuangan of the original financial liability and the
asli dan pengakuan liabilitas keuangan baru. recognition of a new financial liability. Similarly,
Demikian pula, Grup memperhitungkan the Group accounts for substantial modification
modifikasi substansial dari ketentuan liabilitas of terms of an existing liability or part of it as an
yang ada atau bagian dari liabilitas tersebut extinguishment of the original financial liability
sebagai pelepasan liabilitas keuangan awal dan and the recognition of a new liability. It is
pengakuan liabilitas baru. Diasumsikan bahwa assumed that the terms are substantially
persyaratannya berbeda secara substansial jika different if the discounted present value of the
nilai sekarang yang didiskontokan dari arus kas cash flows under the new terms, including any
berdasarkan ketentuan yang baru, termasuk fees paid net of any fees received and
biaya yang dibayarkan setelah dikurangi biaya discounted using the original effective rate is at
yang diterima dan didiskontokan menggunakan least 10 per cent different from the discounted
tarif efektif asli sekurang-kurangnya 10 persen present value of the remaining cash flows of the
berbeda dari hadiah yang didiskontokan. nilai original financial liability. If the modification is
sisa arus kas dari liabilitas keuangan asli. Jika not substantial, the difference between: (1) the
modifikasi tidak substansial, perbedaan antara: carrying amount of the liability before the
(1) jumlah tercatat liabilitas sebelum modifikasi; modification; and (2) the present value of the
dan (2) nilai sekarang dari arus kas setelah cash flows after modification is recognized in
modifikasi diakui dalam laporan laba rugi profit or loss as the modification gain or loss
sebagai keuntungan atau kerugian modifikasi within other gains and losses.
dalam keuntungan dan kerugian lainnya.
i. Instrumen Keuangan Derivatif i. Derivative financial instruments
Grup menggunakan instrumen keuangan The Group enters into interest-rate swap
derivatif swap suku bunga untuk mengelola derivative financial instruments to manage its
eksposur atas risiko suku bunga. Grup juga exposure to interest rate risk. The Group also
menggunakan kontrak berjangka batubara enters into coal futures to management coal
untuk mengelola risiko harga batubara. price risk.
Derivatif awalnya diakui pada nilai wajar pada Derivatives are recognised initially at fair value
tanggal kontrak dilakukan dan selanjutnya at the date a derivative contract is entered into
diukur pada nilai wajarnya pada setiap tanggal and are subsequently remeasured to their fair
pelaporan. Keuntungan atau kerugian yang value at each reporting date. The resulting gain
timbul diakui dalam laba rugi, kecuali apabila or loss is recognised in profit or loss immediately
derivatif telah ditetapkan dan efektif sebagai unless the derivative is designated and effective
instrumen lindung nilai, yang mana pengakuan as a hedging instrument, in which event the
keuntungan atau kerugian tergantung dari timing of the recognition in profit or loss
hubungan lindung nilai tersebut. depends on the nature of the hedge relationship.
- 57 -
Page 62
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
Derivatif dengan nilai wajar positif diakui A derivative with a positive fair value is
sebagai aset keuangan, sedangkan derivatif recognised as a financial asset whereas a
dengan nilai wajar negatif diakui sebagai derivative with a negative fair value is
liabilitas keuangan. Derivatif tidak saling hapus recognised as a financial liability. Derivatives are
dalam laporan keuangan kecuali apabila Grup not offset in the financial statements unless the
memiliki hak yang berkekuatan hukum serta Group has both legal right and intention to
berniat untuk melakukan saling hapus. Suatu offset. A derivative is presented as a non‑current
derivatif disajikan sebagai aset tidak lancar atau asset or a non‑current liability if the remaining
liabilitas jangka panjang jika sisa jatuh tempo maturity of the instrument is more than 12
dari instrumen lebih dari 12 bulan dan tidak months and it is not expected to be realised or
diharapkan akan direalisasi atau diselesaikan settled within 12 months.
dalam jangka waktu 12 bulan.
Derivatif disajikan sebagai aset tidak lancar atau A derivative is presented as a non-current asset
liabilitas tidak lancar jika jatuh tempo or a non-current liability if the remaining
instrumennya lebih dari 12 bulan dan tidak akan maturity of the instrument is more than
direalisasikan atau dibayarkan dalam 12 bulan. 12 months and it is not due to be realized or
Derivatif lainnya disajikan sebagai aset lancar settled within 12 months. Other derivatives are
atau liabilitas jangka pendek. presented as current assets or current liabilities.
j. Akuntansi Lindung Nilai j. Hedge Accounting
Grup menggunakan instrumen keuangan The Group enters into derivative financial
derivatif – interest rate swap untuk mengelola instruments – interest rate swaps to manage its
eksposur atas risiko suku bunga. exposure to interest rate.
Pada saat dimulainya hubungan lindung nilai, At the inception of the hedge relationship, the
Grup mendokumentasi hubungan antara Group documented the relationship between the
instrumen lindung nilai dan item yang dilindung hedging instrument and the hedged item, along
nilai, bersama dengan tujuan manajemen risiko with its risk management objectives and its
dan strategi pelaksanaan lindung nilai. strategy for undertaking various hedge
Selanjutnya, pada saat dimulainya lindung nilai transactions. Furthermore, at the inception of
dan secara berkelanjutan, Grup the hedge and on an ongoing basis, the Group
mendokumentasikan apakah instrumen lindung documented whether the hedging instrument
nilai sangat efektif dalam rangka saling hapus was highly effective in offsetting changes in fair
perubahan dalam nilai wajar atau perubahan values or cash flows of the hedged item
arus kas dari item yang dilindung nilai yang attributable to the hedged risk.
dapat diatribusikan pada risiko lindung nilai.
Catatan 26 menetapkan rincian dari nilai wajar Note 26 sets out details of the fair values of the
instrumen derivatif yang digunakan untuk derivative instruments used for hedging
tujuan lindung nilai. purposes.
Lindung Nilai atas Arus Kas Cash flow hedges
Bagian efektif dari perubahan nilai wajar The effective portion of changes in the fair value
derivatif yang ditujukan dan memenuhi of derivatives that were designated and qualified
kualifikasi sebagai lindung nilai arus kas diakui as cash flow hedges was recognized in other
sebagai penghasilan komprehensif lain dan comprehensive income and accumulated under
terakumulasi pada cadangan lindung nilai arus the heading of cash flow hedging reserve. The
kas. Keuntungan atau kerugian yang terkait gain or loss relating to the ineffective portion
dengan bagian yang tidak efektif langsung was recognized immediately in profit or loss, and
diakui dalam laba rugi, dan termasuk dalam is included in the “other gains and losses – net”
”keuntungan dan kerugian lainnya – bersih”. line item.
Jumlah yang sebelumnya diakui sebagai Amounts previously recognized in other
penghasilan komprehensif lain dan terakumulasi comprehensive income and accumulated in
dalam ekuitas direklasifikasi ke laba rugi pada equity were reclassified to profit or loss in the
periode ketika item yang dilindung nilai diakui periods when the hedged item was recognized
dalam laba rugi, di pos yang sama dari laporan in profit or loss, in the same line of the
laba rugi dan penghasilan komprehensif lain consolidated statement of profit or loss and
konsolidasian dengan item yang dilindung nilai. other comprehensive income as the recognized
Namun, ketika suatu lindung nilai atas prakiraan hedged item. However, when the hedged
transaksi yang kemudian menimbulkan forecast transaction resulted in the recognition
- 58 -
Page 63
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
pengakuan aset non-keuangan atau liabilitas of a non-financial asset or a non-financial
non-keuangan, keuntungan dan kerugian yang liability, the gains and losses previously
sebelumnya diakui sebagai penghasilan recognized in other comprehensive income and
komprehensif lain dan terakumulasi di ekuitas accumulated in equity were transferred from
dipindahkan dari ekuitas dan termasuk dalam equity and included in the initial measurement
pengukuran awal biaya dari aset non-keuangan of the cost of the non-financial asset or non-
atau liabilitas non-keuangan. financial liability.
Akuntansi lindung nilai dihentikan pada saat Hedge accounting was discontinued when the
Grup membatalkan hubungan lindung nilai, Group revoked the hedging relationship, when
ketika instrumen lindung nilai kadaluwarsa atau the hedging instrument expired or was sold,
dijual, dihentikan atau digunakan, atau ketika terminated, or exercised, or it no longer
tidak lagi memenuhi persyaratan akuntansi qualified for hedge accounting. Any gain or loss
lindung nilai. Keuntungan dan kerugian diakui recognized in other comprehensive income and
dalam penghasilan komprehensif lain dan accumulated in equity at that time remained in
terakumulasi di ekuitas saat itu tetap berada di equity and was recognized when the forecast
bagian ekuitas dan akan diakui pada saat transaction was ultimately recognized in profit
prakiraan transaksi yang pada akhirnya diakui or loss. When a forecast transaction was no
dalam laba rugi. Ketika prakiraan transaksi tidak longer expected to occur, the gain or loss
lagi diharapkan akan terjadi, akumulasi accumulated in equity was recognized
keuntungan atau kerugian dalam ekuitas immediately in profit or loss.
langsung diakui dalam laba rugi.
k. Saling hapus antar Aset Keuangan dan k. Netting of Financial Assets and Financial
Liabilitas Keuangan Liabilities
Aset keuangan dan liabilitas keuangan Financial assets and financial liabilities are offset
disalinghapuskan dan nilai netonya disajikan and the net amount presented in the statement
dalam laporan posisi keuangan jika Grup of financial position when the Groups has a
tersebut memiliki hak yang dapat dipaksakan legally enforceable right to set off the recognized
secara hukum untuk melakukan saling hapus amounts; and intends either to settle on a net
atas jumlah yang telah diakui; dan berintensi basis, or to realise the asset and settle the
untuk menyelesaikan secara neto atau untuk liability simultaneously. A right to set-off must
merealisasikan aset dan menyelesaikan be available today rather than being contingent
liabilitasnya secara simultan. Hak saling hapus on a future event and must be exercisable by
dapat ada pada saat ini dari pada bersifat any of the counterparties, both in the normal
kontinjen atas terjadinya suatu peristiwa di course of business and in the event of default,
masa depan dan harus dieksekusi oleh pihak insolvency or bankruptcy.
lawan, baik dalam situasi bisnis normal dan
dalam peristiwa gagal bayar, peristiwa
kepailitan atau kebangkrutan.
l. Kas dan Setara Kas l. Cash and Cash Equivalents
Untuk penyajian laporan arus kas, kas dan For cash flow presentation purposes, cash and
setara kas terdiri dari kas, bank dan semua cash equivalents consist of cash on hand and in
investasi yang jatuh tempo dalam waktu tiga banks and all unrestricted investments with
bulan atau kurang dari tanggal perolehannya maturities of three months or less from the date
dan yang tidak dijaminkan serta tidak dibatasi of placement.
penggunaannya.
m. Kepemilikan dalam Operasi Bersama m. Interest in Joint Operations
Operasi bersama adalah pengaturan bersama A joint operation is a joint arrangement whereby
dimana para pihak yang memiliki pengendalian the parties that have joint control of the
bersama atas pengaturan memiliki hak atas aset arrangement have rights to the assets, and
dan kewajiban terhadap liabilitas terkait dengan obligations for the liabilities, relating to the
pengaturan tersebut. Pengendalian bersama arrangement. Joint control is the contractually
adalah persetujuan kontraktual untuk berbagi agreed sharing of control of an arrangements,
pengendalian atas suatu pengaturan yang ada which exists only when decisions about the
hanya ketika keputusan mengenai aktivitas relevant activities require unanimous consent of
relevan mensyaratkan persetujuan dengan the parties sharing control.
suara bulat dari seluruh pihak yang berbagi
pengendalian.
- 59 -
Page 64
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
Ketika entitas Grup melakukan kegiatan When the Group undertakes their activities
berdasarkan operasi bersama, Grup sebagai under joint operations, the Group as a joint
operator bersama mengakui hal berikut terkait operator recognizes in relation to their interest
dengan kepentingannya dalam operasi in a joint operation:
bersama:
• Aset, mencakup bagiannya atas setiap aset • Their assets, including their share of any
yang dimiliki bersama; assets held jointly;
• Liabilitas, mencakup bagiannya atas • Their liabilities, including their share of any
liabilitas yang terjadi bersama; liabilities incurred jointly;
• Pendapatan dari penjualan bagiannya atas • Their revenue from the sale of their share
ouput yang dihasilkan dari operasi bersama; of the output arising from the joint
operation;
• Bagiannya atas pendapatan dari penjualan • Their share of the revenue from the sale of
output oleh operasi bersama; dan the output by the joint operation; and
• Beban, mencakup bagiannya atas setiap • Their expenses, including its share of any
beban yang terjadi secara bersama-sama. expenses incurred jointly.
Grup mencatat aset, liabilitas, pendapatan dan Group account for the assets, liabilities,
beban terkait dengan kepemilikannya dalam revenues and expenses relating to their interest
operasi bersama sesuai dengan PSAK yang in a joint operation in accordance with the
berlaku untuk aset, liabilitas, pendapatan dan PSAKs applicable to the particular assets,
beban tersebut. liabilities, revenues and expenses.
Ketika Grup melakukan transaksi dengan When the Group transactions with a joint
operasi bersama dimana entitas Grup tersebut operation in which a group entity is a joint
bertindak sebagai salah satu operator operator (such as a sale or contribution of
bersamanya (seperti penjualan atau kontribusi assets), the Group are considered to be
aset), Grup melakukan transaksi dengan pihak conducting the transaction with the other
lain dalam operasi bersama dan, dengan parties to the joint operation, and gains and
demikian, keuntungan dan kerugian yang losses resulting from the transactions are
dihasilkan dari transaksi diakui di dalam laporan recognized in the Group’ consolidated financial
keuangan konsolidasian Grup tersebut hanya statements only to the extent of other parties’
sebatas kepentingan para pihak lain dalam interests in the joint operation.
operasi bersama.
Ketika Grup melakukan transaksi dengan When the Group transactions with a joint
operasi bersama yang entitas tersebut bertindak operation in which a group entity is a joint
sebagai salah satu operator bersamanya operator (such as a purchase of assets), the
(seperti pembelian aset), Grup tidak mengakui Group does not recognize their share of the
bagian keuntungan dan kerugiannya sampai gains and losses until they resell those assets to
Grup menjual kembali aset tersebut kepada a third party.
pihak ketiga.
n. Investasi pada Entitas Asosiasi dan n. Investments in Associates and Joint
Ventura Bersama Ventures
Entitas asosiasi adalah suatu entitas yang mana An associate is an entity over which the Group
Grup mempunyai pengaruh yang signifikan. has significant influence and that is neither a
Pengaruh signifikan adalah kekuasaan untuk subsidiary nor an interest in a joint venture.
berpartipasi dalam keputusan kebijakan Significant influence is the power to participate
keuangan dan operasional investee tetapi tidak in the financial and operating policy decisions of
mengendalikan atau mengendalikan bersama the investee but is not control or joint control
atas kebijakan tersebut. over those policies.
- 60 -
Page 65
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
Ventura bersama adalah pengaturan bersama A joint venture is a joint arrangement whereby
dimana para pihak yang memiliki pengendalian the parties that have joint control of the
bersama atas pengaturan memiliki hak atas aset arrangement have rights to the net assets of the
bersih pengaturan bersama. Pengendalian joint arrangement. Joint control is the
bersama adalah persetujuan kontraktual untuk contractually agreed sharing of control of an
berbagi pengendalian atas suatu pengaturan arrangement, which exists only when decisions
yang ada hanya ketika keputusan mengenai about the relevant activities require unanimous
aktivitas relevan mensyaratkan persetujuan consent of the parties sharing control.
dengan suara bulat dari seluruh pihak yang
berbagi pengendalian.
Penghasilan dan aset dan liabilitas dari entitas The results of operations and assets and
asosiasi dicatat dalam laporan keuangan liabilities of associates incorporated in these
konsolidasian dengan menggunakan metode consolidated financial statements using the
ekuitas, kecuali ketika investasi diklasifikasikan equity method of accounting, except when the
sebagai dimiliki untuk dijual, sesuai dengan investment is classified as held for sale, in which
PSAK 105 Aset Tidak Lancar yang Dimiliki untuk case, it is accounted for in accordance with PSAK
Dijual dan Operasi yang Dihentikan. Dengan 105 Non-current Assets Held for Sale and
metode ekuitas, investasi pada entitas asosiasi Discontinued Operations. Under the equity
atau ventura bersama diakui di laporan posisi method, an investment in an associate or a joint
keuangan konsolidasian sebesar biaya venture initially recognized in the consolidated
perolehan dan selanjutnya disesuaikan untuk statement of financial position at cost and
perubahan dalam bagian kepemilikan Grup atas adjusted thereafter to recognize the Group’s
laba rugi dan penghasilan komprehensif lain dari share of the profit or loss and other
entitas asosiasi yang terjadi setelah perolehan. comprehensive income of the. When the Group’s
Ketika bagian Grup atas kerugian entitas share of losses of an associate or a joint venture
asosiasi atau ventura bersama melebihi exceeds the Group’s interest in that associate or
kepentingan Grup pada entitas asosiasi atau joint venture (which includes any long-term
ventura bersama (yang mencakup semua interests that, in substance, form part of the
kepentingan jangka panjang, yang secara Group’s net investment in the associate or joint
substansi, membentuk bagian dari investasi venture) the Group discontinues recognizing its
bersih Grup dalam entitas asosiasi atau ventura share of further losses. Additional losses are
bersama), Grup menghentikan pengakuan recognized only to the extent that the Group has
bagiannya atas kerugian selanjutnya. Kerugian incurred legal or constructive obligations or
selanjutnya diakui hanya apabila Grup made payments on behalf of the associate or
mempunyai kewajiban bersifat hukum atau joint venture.
konstruktif atau melakukan pembayaran atas
nama entitas asosiasi atau ventura bersama.
Investasi pada entitas asosiasi atau ventura An investment in an associate or a joint venture
bersama dicatat dengan menggunakan metode is accounted for using the equity method from
ekuitas sejak tanggal saat investee menjadi the date on which the investee becomes an
entitas asosiasi atau ventura bersama. Setiap associate or a joint venture. Any excess of the
kelebihan biaya perolehan investasi atas bagian cost of acquisition over the Group’s share of the
Grup atas nilai wajar bersih dari aset yang net fair value of identifiable assets and liabilities
teridentifikasi dan liabilitas dari entitas asosiasi of an associate recognized at the date of
yang diakui pada tanggal akuisisi diakui sebagai acquisition is recognized as goodwill, which is
goodwill. Goodwill termasuk dalam jumlah included within the carrying amount of the
tercatat investasi, dan diuji penurunan nilainya investment. Any excess of the Group’s share of
sebagai bagian dari investasi. Setiap kelebihan the net fair value of the identifiable assets and
kepemilikan Grup dari nilai wajar bersih aset liabilities over the cost of acquisition, after
yang teridentifikasi dan liabilitas atas biaya reassessment, is recognized immediately in
perolehan investasi, sesudah pengujian kembali, profit or loss in the period in which the
segera diakui di dalam laba rugi pada periode investment is acquired.
diperolehnya investasinya.
Persyaratan dalam PSAK 236 Penurunan Nilai The requirements of PSAK 236 Impairment of
Aset (“PSAK 236”), diterapkan untuk Assets (“PSAK 236”) are applied to determine
menentukan apakah perlu untuk mengakui whether it is necessary to recognize any
setiap penurunan nilai sehubungan dengan impairment loss with respect to the Group’s
investasi pada entitas asosiasi dan ventura investment in an associate or a joint venture.
bersama. Bila diperlukan, jumlah tercatat When necessary, the entire carrying amount of
investasi (termasuk goodwill) diuji penurunan the investment (including goodwill) is tested for
nilai sesuai dengan PSAK 236, sebagai suatu impairment in accordance with PSAK 236, as a
- 61 -
Page 66
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
aset tunggal dengan membandingkan antara single asset by comparing its recoverable
jumlah terpulihkan (mana yang lebih tinggi amount (higher of value in use and fair value
antara nilai pakai dan nilai wajar dikurangi biaya less costs to sell) with its carrying amount. Any
pelepasan) dengan jumlah tercatatnya. Rugi impairment loss recognized forms part of the
penurunan nilai diakui langsung pada nilai carrying amount of the investment. Any reversal
tercatat investasi. Setiap pembalikan dari of that impairment loss is recognized in
penurunan nilai diakui sesuai dengan PSAK 236 accordance with PSAK 236 to the extent that the
sepanjang jumlah terpulihkan dari investasi recoverable amount of the investment
tersebut kemudian meningkat. subsequently increases.
Grup menghentikan penggunaan metode The Group discontinues the use of the equity
ekuitas sejak tanggal saat investasinya berhenti method from the date when the investment
menjadi investasi pada entitas asosiasi atau ceases to be an associate or a joint venture, or
ventura bersama atau ketika investasi when the investment is classified as held for
diklasifikasi sebagai dimiliki untuk dijual. Ketika sale. When the Group retains an interest in the
Grup mempertahankan kepemilikan dalam former associate or a joint venture and the
entitas yang sebelumnya merupakan entitas retained interest is a financial asset, the Group
asosiasi atau ventura bersama dan sisa investasi measures any retained investment at fair value
tersebut merupakan aset keuangan, Grup at that date and the fair value is regarded as its
mengukur setiap sisa investasi pada nilai wajar fair value on initial recognition in accordance
pada tanggal tersebut dan nilai wajar tersebut with PSAK 109. The difference between the
dianggap sebagai nilai wajar pada saat carrying amount of the associate or a joint
pengakuan awal sesuai dengan PSAK 109. venture at the date the equity method was
Selisih antara jumlah tercatat pada asosiasi atau discontinued, and the fair value of any retained
ventura bersama pada tanggal metode ekuitas interest and any proceeds from disposing of a
dihentikan, dan nilai wajar dari setiap bunga part of interest in the associate or a joint
yang ditahan dan hasilkan dari pelepasan venture is included in the determination of the
sebagian kepentingan dalam asosiasi atau gain or loss on disposal of the associate or joint
ventura bersama termasuk dalam penentuan venture. In addition, the Group accounts for all
keuntungan atau kerugian pada pelepasan amounts previously recognized in other
asosiasi atau ventura bersama. Selanjutnya, comprehensive income in relation to that
Grup mencatat seluruh jumlah yang sebelumnya associate on the same basis as would be
telah diakui dalam penghasilan komprehensif required if that associate had directly disposed
lain yang terkait dengan entitas asosiasi of the related assets or liabilities. Therefore, if a
tersebut dengan menggunakan dasar perlakuan gain or loss previously recognized in other
yang sama dengan yang disyaratkan jika entitas comprehensive income by that associate or joint
asosiasi telah melepaskan secara langsung aset venture would be reclassified to profit or loss on
dan liabilitas yang terkait. Seluruh jumlah yang the disposal of the related assets or liabilities,
diakui dalam penghasilan komprehensif lain the Group reclassifies the gain or loss from
yang terkait dengan entitas asosiasi atau equity to profit or loss (as a reclassification
ventura bersama direklasifikasi ke laba rugi adjustment) when the equity method is
(sebagai penyesuaian reklasifikasi) pada saat discontinued.
penghentian metode ekuitas.
Grup melanjutkan penerapan metode ekuitas The Group continues to use the equity method
jika investasi pada entitas asosiasi menjadi when an investment in an associate becomes an
investasi pada ventura bersama. Tidak terdapat investment in a joint venture. There is no
pengukuran kembali ke nilai wajar pada saat remeasurement to fair value upon such changes
perubahan kepentingan. in ownership interests.
Jika Grup mengurangi bagian kepemilikan pada When the Group reduces its ownership interest
entitas asosiasi atau ventura bersama tetapi in an associate or a joint venture but the Group
Grup tetap menerapkan metode ekuitas, Grup continues to use the equity method, the Group
mereklasifikasi ke laba rugi proporsi keuntungan reclassifies to profit or loss the proportion of the
atau kerugian yang telah diakui sebelumnya gain or loss that had previously been recognized
dalam penghasilan komprehensif lain yang in other comprehensive income relating to that
terkait dengan pengurangan bagian kepemilikan reduction in ownership interest (if that gain or
(jika keuntungan atau kerugian tersebut akan loss would be reclassified to profit or loss on the
direklasifikasi ke laba rugi atas pelepasan aset disposal of the related assets or liabilities).
atau liabilitas yang terkait.)
- 62 -
Page 67
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
Ketika Grup melakukan transaksi dengan entitas When the Group entity transacts with an
asosiasi atau ventura bersama, keuntungan dan associate or a joint venture, profits and losses
kerugian yang timbul dari transaksi dengan resulting from the transactions with the
entitas asosiasi atau ventura bersama diakui associate or joint venture are recognized in the
dalam laporan keuangan konsolidasian Grup Group’s consolidated financial statements only
hanya sebesar kepemilikan dalam entitas to the extent of its interest in the associate or
asosiasi atau ventura bersama yang tidak terkait joint venture that are not related to the Group.
dengan Grup.
o. Persediaan o. Inventories
Persediaan batubara dinyatakan berdasarkan Coal inventories are recognized at the lower of
biaya perolehan atau nilai realisasi bersih, mana cost and net realizable value. Cost, which
yang lebih rendah. Biaya perolehan yang includes an appropriate allocation of material
mencakup alokasi komponen biaya bahan baku, costs, labor costs and overhead costs related to
tenaga kerja, penyusutan dan biaya tidak mining activities, is determined using the
langsung yang berkaitan dengan aktivitas weighted average method. Motor vehicle
penambangan, ditentukan dengan metode rata- inventories are stated at cost or net realizable
rata tertimbang. Persediaan kendaraan value, whichever is lower. Cost is determined
bermotor dinyatakan berdasarkan biaya using the moving average method. Inventories
perolehan atau nilai realisasi bersih, mana yang related to essential oils and aroma chemicals are
lebih rendah. Biaya perolehan ditentukan stated at cost or net realizable value, whichever
dengan metode rata-rata bergerak. Persediaan is lower. Cost is determined using the weighted
terkait dengan minyak atsiri dan bahan aroma average method. Net realizable value is the
kimia dinyatakan berdasarkan biaya perolehan estimated sales price in the ordinary course of
atau nilai realisasi bersih, mana yang lebih business, less estimated costs of completion and
rendah. Biaya perolehan ditentukan dengan costs necessary to make the sale.
metode rata-rata tertimbang. Nilai realisasi
bersih adalah taksiran harga penjualan dalam
kegiatan usaha normal dikurangi taksiran biaya
penyelesaian dan biaya yang diperlukan untuk
melaksanakan penjualan.
Suku cadang dan bahan pembantu, bahan bakar Spare parts and supplies, diesel fuel and fuel,
diesel dan minyak, minyak pelumas dan bahan lubricants and blasting materials are stated at
peledak dinyatakan berdasarkan biaya cost or net realizable value, whichever is lower.
perolehan atau nilai realisasi bersih, mana yang Cost for spare parts and supplies as well as
lebih rendah. Biaya perolehan atas suku cadang lubricants are determined using the weighted
dan bahan pembantu serta minyak pelumas average method while diesel fuel and fuel are
ditentukan dengan metode rata-rata tertimbang determined using the First-in-First-out (FIFO)
sedangkan bahan bakar diesel dan minyak method. The provision for obsolete and slow
ditentukan dengan metode FIFO. Penyisihan moving inventories is determined on the basis of
untuk persediaan usang dan yang estimated future usage of individual inventory
pergerakannya lambat ditentukan berdasarkan items. Supplies of maintenance materials are
estimasi penggunaan masing-masing jenis charged to cost of contracts and goods sold and
persediaan pada masa mendatang. Bahan operating expenses in the period in which they
pendukung kegiatan pemeliharaan dicatat are used.
sebagai beban pokok kontrak dan penjualan dan
beban usaha pada periode yang digunakan.
p. Biaya Dibayar Dimuka p. Prepaid Expenses
Biaya dibayar dimuka diamortisasi selama masa Prepaid expenses are amortized over their
manfaat masing-masing biaya dengan beneficial periods using the straight-line
menggunakan metode garis lurus. method.
q. Aset Tetap q. Property, Plant and Equipment
Aset tetap lainnya selain aset tanaman Property, Plant and Equipment other than bearer
plants
Aset tetap dicatat berdasarkan biaya perolehan Property, plant and equipment are stated at
setelah dikurangi akumulasi penyusutan dan cost, less accumulated depreciation and any
akumulasi kerugian penurunan nilai. accumulated impairment losses.
- 63 -
Page 68
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
Penyusutan diakui dengan metode garis lurus Depreciation is recognized so as to write off the
setelah memperhitungkan nilai residu cost of assets less residual values using the
berdasarkan taksiran masa manfaat ekonomis straight-line method based on the estimated
aset tetap sebagai berikut: useful lives of the assets as follows:
Tahun/ Years
Bangunan infrastruktur, prasarana dan Buildings infrastructure, leasehold and
perbaikan bangunan 5 - 30 improvements
Perabotan, perlengkapan dan peralatan
kantor lainnya 2 - 10 Office furniture, fixtures and other equipment
Kendaraan bermotor 3-8 Motor vehicles
Mesin dan peralatan 4 - 20 Machinery and equipment
Kapal 15 - 18 Vessels
Alat berat, peralatan, pengangkutan
dan kendaraan 3-8 Plant, equipment, heavy equipment and vehicles
Beberapa komponen dari alat berat, peralatan Certain component of plant, equipment and
dan kendaraan disusutkan atas dasar vehicle are depreciated using hourly utilization
penggunaan jasa kerja selama taksiran umur basis over their estimated operating life.
operasi komponen tersebut.
Tanah dinyatakan berdasarkan biaya perolehan Land is stated at cost and is not depreciated.
dan tidak disusutkan.
Beban pemeliharaan dan perbaikan dibebankan The cost of maintenance and repairs is charged
pada laba rugi pada saat terjadinya. Biaya-biaya to profit or loss as incurred. Other costs incurred
lain yang terjadi selanjutnya yang timbul untuk subsequently to add to, replace part of, or
menambah, mengganti atau memperbaiki aset service an item of property, plant and
tetap dicatat sebagai biaya perolehan aset jika equipment, are recognized as asset if, and only
dan hanya jika besar kemungkinan manfaat if it is probable that future economic benefits
ekonomis di masa depan berkenaan dengan aset associated with the item will flow to the entity
tersebut akan mengalir ke entitas dan biaya and the cost of the item can be measured
perolehan aset dapat diukur secara andal. reliably.
Aset tetap dihentikan pengakuannya pada saat An item of property, plant and equipment is
pelepasan atau ketika tidak ada manfaat derecognized upon disposal or when no future
ekonomik masa depan yang diharapkan timbul economic benefits are expected to arise from the
dari penggunaan aset secara berkelanjutan. continued use of the asset. Any gain or loss
Keuntungan atau kerugian yang timbul dari arising on the disposal or retirement of an item
pelepasan atau penghentian pengakuan suatu of property, plant and equipment is determined
aset tetap ditentukan sebagai selisih antara hasil as the difference between the sales proceeds
penjualan dan nilai tercatat aset dan diakui and the carrying amount of the asset and is
dalam laba rugi. recognized in profit or loss.
Aset dalam penyelesaian dinyatakan sebesar Construction in-progress is stated at cost and
biaya perolehan dipindahkan ke masing-masing transferred to the respective property, plant and
aset tetap yang bersangkutan pada saat selesai equipment account when completed and ready
dan siap digunakan. for use.
Tanaman Produktif Bearer Plants
Tanaman produktif adalah tanaman hidup yang Bearer plants are living plants used in the
digunakan dalam produksi atau penyediaan production or supply of agricultural produce; are
produk agrikultur; diharapkan untuk expected to bear produce for more than one
menghasilkan produk untuk jangka waktu lebih period. Bearer plants are classified into
dari satu periode. Tanaman produktif dibagi immature bearer plants and mature bearer
menjadi tanaman produktif belum menghasilkan plants that are used and expected to bear
dan tanaman produktif menghasilkan yang agricultural produce for more than one period.
diharapkan menghasilkan produk agrikultur
untuk jangka waktu lebih dari satu periode.
Tanaman produktif belum menghasilkan Immature bearer plants are stated at acquisition
dinyatakan sebesar harga perolehan yang costs which include costs incurred for field
meliputi biaya persiapan lahan, penanaman, preparation, planting, fertilizing, and
- 64 -
Page 69
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
pemupukan dan pemeliharaan dan biaya tidak maintenance, and allocation of other indirect
langsung lainnya yang dialokasikan berdasarkan costs based on planted hectares. When the
luas hektar tertanam. Pada saat tanaman sudah plantations mature, the accumulated costs are
menghasilkan, akumulasi harga perolehan reclassified to mature bearer plants. In general,
tersebut akan direklasifikasi ke tanaman a calliandra bearer plants takes about 12 to 15
produktif menghasilkan. Secara umum, months to reach maturity from the time of
tanaman produktif kaliandra memerlukan waktu planting the seedlings to the field.
sekitar 12 sampai dengan 15 bulan sejak
penanaman bibit untuk menjadi tanaman
produktif menghasilkan.
Penyusutan tanaman produktif menghasilkan Depreciation of mature bearer plants
dimulai pada tahun tanaman tersebut commences in the year when the plantations
menghasilkan dengan menggunakan metode mature using the straight-line method over the
garis lurus selama taksiran masa manfaat estimated productive life of 12 years. Calliandra
produktif yaitu 12 tahun. Kaliandra dinyatakan are considered mature within 12 to 15 months
menghasilkan bila telah berumur 12 sampai after planting and generating.
dengan 15 bulan.
r. Aset Dimiliki untuk Dijual dan Operasi yang r. Asset Held for Sale and Discontinued
Dihentikan Operation
Aset tidak lancar yang dimiliki untuk dijual (atau Non-current assets (or disposal groups) are
kelompok lepasan) diklasifikasi sebagai dimiliki classified as held for sale if their carrying amount
untuk dijual jika jumlah tercatatnya akan will be recovered principally through a sale
dipulihkan terutama melalui transaksi penjualan transaction rather than through continuing use.
dari pada melalui pemakaian berlanjut. Kondisi This condition is regarded as met only when the
ini dianggap terpenuhi hanya ketika aset (atau asset (or disposal group) is available for
kelompok lepasan) berada dalam keadaan immediate sale in its present condition subject
segera dapat dijual dengan syarat-syarat yang only to terms that are usual and customary for
biasa dan umum yang diperlukan dalam sales of such asset (or disposal group) and its
penjualan aset (atau kelompok lepasan) sale is highly probable. Management must be
tersebut dan penjualannya harus sangat committed to the sale, which should be expected
mungkin terjadi. Manajemen harus memiliki to qualify for recognition as a completed sale
komitmen untuk menjual dan penjualan within one year from the date of classification.
diharapkan untuk diselesaikan dalam waktu satu
tahun sejak tanggal klasifikasi.
Ketika Grup berkomitmen terhadap rencana When the Group is committed to a sale plan
penjualan yang mengakibatkan kehilangan involving loss of control of a subsidiary, all of the
pengendalian atas entitas anak, seluruh aset assets and liabilities of that subsidiary are
dan liabilitas entitas anak tersebut diklasifikasi classified as held for sale when the criteria
sebagai dimiliki untuk dijual ketika kriteria yang described above are met, regardless of whether
dijelaskan di atas terpenuhi, terlepas pada the Group will retain a non-controlling interest in
apakah setelah penjualan tersebut Grup masih its former subsidiary after the sale.
memiliki kepentingan nonpengendali dalam
entitas yang sebelumnya merupakan entitas
anak atau tidak.
Kerugian penurunan nilai awal atau selanjutnya An impairment loss is recognized for any initial
diakui atas penurunan nilai aset (atau kelompok or subsequent write‑down of the asset (or
lepasan) ke nilai wajar dikurangi dengan biaya disposal group) to fair value less costs to sell. A
untuk menjual aset. Keuntungan diakui atas gain is recognized for any subsequent increases
peningkatan nilai wajar dikurangi biaya untuk in fair value less costs to sell of an asset (or
menjual aset (atau kelompok lepasan), tetapi disposal group), but not in excess of any
tidak boleh melebihi akumulasi rugi penurunan cumulative impairment loss previously
nilai yang telah diakui sebelumnya. Keuntungan recognized. A gain or loss not previously
atau kerugian yang sebelumnya tidak diakui recognized by the date of the sale of the non-
pada tanggal penjualan aset tidak lancar (atau current asset (or disposal group) is recognized
kelompok lepasan) diakui pada tanggal at the date of derecognition.
penghentian pengakuan.
- 65 -
Page 70
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
Aset tidak lancar yang diklasifikasikan sebagai Non-current assets classified as held for sale and
dimiliki untuk dijual dan aset dalam kelompok the assets of a disposal group classified as held
lepasan yang dimiliki untuk dijual disajikan for sale are presented separately from the other
secara terpisah dari aset lainnya dalam laporan assets in the consolidated statement of financial
posisi keuangan konsolidasian. Liabilitas dalam position. The liabilities of a disposal group
kelompok lepasan yang diklasifikasikan sebagai classified as held for sale are presented
dimiliki untuk dijual disajikan secara terpisah separately from other liabilities in the
dari liabilitas lainnya dalam laporan posisi consolidated statement of financial position.
keuangan konsolidasian.
Operasi yang dihentikan adalah komponen A discontinued operation is a component of the
entitas yang telah dilepaskan atau entity that has been disposed of or is classified
diklasifikasikan sebagai (a) dimiliki untuk dijual as held for sale and that represents (a) a
dan mewakili lini usaha atau area geografis separate major line of business or geographical
operasi utama yang terpisah, (b) merupakan area of operations, (b) is part of a single co-
bagian dari suatu rencana tunggal terkoordinasi ordinated plan to dispose of such a line of
untuk melepaskan lini usaha atau area operasi, business or area of operations, or
atau (c) merupakan suatu entitas anak yang (c) is a subsidiary acquired exclusively with a
diperoleh secara khusus dengan tujuan dijual view to resale.
kembali.
s. Sewa s. Leases
Grup sebagai penyewa The Group as lessee
Grup menilai apakah kontrak merupakan, atau The Group assesses whether a contract is or
mengandung sewa pada tanggal insepsi kontrak. contains a lease, at inception of the contract.
Grup mengakui aset hak guna dan liabilitas sewa The Group recognises a right-of-use asset and a
terkait semua perjanjian sewa, kecuali untuk corresponding lease liability with respect to all
sewa jangka pendek (masa sewa 12 bulan atau lease arrangements, except for short-term
kurang) dan sewa dengan aset pendasar bernilai leases (defined as leases with a lease term of 12
rendah. Untuk kontrak sewa ini, Grup mengakui months or less) and leases of low value assets.
pembayaran sewa sebagai beban dengan dasar For these leases, the Group recognise the lease
garis lurus selama masa sewa, kecuali terdapat payments as an operating expense on a
dasar sistematis lain yang dapat lebih straight-line basis over the term of the lease
mencerminkan pola waktu dari manfaat aset unless another systematic basis is more
yang dinikmati pengguna. representative of the time pattern in which
economic benefits from the leased assets are
consumed.
Liabilitas sewa awalnya diukur pada nilai kini The lease liability is initially measured at the
pembayaran sewa yang belum dibayar pada present value of the lease payments that are not
tanggal permulaan, didiskontokan dengan paid at the commencement date, discounted by
menggunakan suku bunga implisit dalam sewa. using the rate implicit in the lease. If this rate
Jika suku bunga tersebut tidak dapat ditentukan, cannot be readily determined, the Group use the
maka Grup menggunakan suku bunga pinjaman incremental borrowing rate specific to the
incremental khusus untuk penyewa. leasee.
Pembayaran sewa yang termasuk dalam Lease payments included in the measurement of
pengukuran liabilitas sewa meliputi: the lease liability comprise:
• Pembayaran tetap (termasuk secara • Fixed lease payments (including in-
substansi pembayaran tetap), dikurangi substance fixed payments), less any lease
insentif sewa; incentives;
• Pembayaran variabel yang bergantung pada • Variable lease payments that depend on an
indeks atau suku bunga, awalnya diukur index or rate, initially measured using the
menggunakan indeks atau suku bunga pada index or rate at the commencement date;
tanggal permulaan;
• Jumlah yang diperkirakan akan dibayar • The amount expected to be payable under
dalam jaminan nilai residual; residual value guarantees;
- 66 -
Page 71
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
• Harga eksekusi opsi beli, jika cukup pasti • The exercise price of purchase options, if it
untuk mengeksekusi opsi tersebut; dan is reasonably certain to exercise the options;
and
• Pembayaran penalti karena penghentian • Payments of penalties for terminating the
sewa, jika ketentuan sewa merefleksikan lease, if the lease term reflects the exercise
eksekusi opsi untuk menghentikan sewa. of an option to terminate the lease.
Liabilitas sewa disajikan secara terpisah dalam The lease liability is presented as a separate line
laporan posisi keuangan konsolidasian. in the consollidated statement of financial
position.
Liabilitas sewa selanjutnya diukur dengan The lease liability is subsequently measured by
meningkatkan jumlah tercatat untuk increasing the carrying amount to reflect
merefleksikan bunga atas liabilitas sewa interest on the lease liability (using the effective
(dengan menggunakan metode suku bunga interest method) and by reducing the carrying
efektif) dan mengurangi jumlah tercatat untuk amount to reflect the lease payments made.
merefleksikan sewa yang telah dibayar.
Grup mengukur kembali liabilitas sewa (dan Group remeasures the lease liability (and makes
melakukan penyesuaian terhadap aset hak guna a corresponding adjustment to the related right-
terkait) apabila: of-use asset) whenever:
• Masa sewa dirubah atau terdapat kejadian • The lease term has changed or there is a
signifikan atau perubahan keadaan yang significant event or change in circumstances
mengakibatkan perubahan penilaian atas resulting in a change in the assessment of
opsi membeli aset pendasar, dalam hal ini exercise of a purchase option, in which case
liabilitas sewa diukur kembali dengan the lease liability is remeasured by
mendiskontokan pembayaran sewa revisian discounting the revised lease payments
dengan tingkat diskonto revisian; using a revised discount rate;
• Pembayaran sewa berubah akibat perubahan • The lease payments change due to changes
indeks atau suku bunga atau perubahan in an index or rate or a change in expected
jumlah pembayaran yang diharapkan dalam payment under a guaranteed residual value,
nilai residual terjamin, yang dalam hal ini, in which cases the lease liability is
liabilitas sewa diukur kembali dengan remeasured by discounting the revised lease
mendiskontokan pembayaran sewa revisian payments using the initial discount rate
dengan tingkat diskonto awal (kecuali (unless the lease payments change is due to
perubahan pembayaran sewa berasal dari a change in a floating interest rate, in which
perubahan suku bunga mengambang, dalam case a revised discount rate is used); or
hal ini digunakan tingkat diskonto revisian);
atau
• Kontrak sewa dimodifikasi dan modifikasi • A lease contract is modified and the lease
sewa tersebut tidak dicatat sebagai sewa modification is not accounted for as a
terpisah, yang dalam hal ini liabilitas sewa separate lease, in which case the lease
diukur kembali dengan mendiskontokan liability is remeasured by discounting the
pembayaran sewa revisian dengan tingkat revised lease payments using a revised
diskonto revisian pada tanggal efektif discount rate at the effective date of the
modifikasi. modification.
Grup tidak melakukan penyesuaian seperti itu The Group did not make any such adjustments
selama periode yang disajikan. during the periods presented.
Aset hak guna meliputi jumlah pengukuran awal The right-of-use assets comprise the initial
liabilitas sewa, pembayaran sewa yang measurement of the corresponding lease
dilakukan pada atau sebelum tanggal permulaan liability, lease payments made at or before the
dikurangi dengan insentif sewa diterima, dan commencement day, less any lease incentives
biaya langsung awal. Selanjutnya, aset hak guna received and any initial direct costs. The right-
diukur pada biaya perolehan dikurangi of-use assets are subsequently measured at cost
akumulasi depresiasi dan kerugian penurunan less accumulated depreciation and impairment
nilai. losses.
- 67 -
Page 72
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
Apabila Grup mempunyai kewajiban untuk biaya Whenever the Group incur an obligation for costs
membongkar dan memindahkan aset pendasar, to dismantle and remove a leased asset, restore
merestorasi tempat aset berada atau the site on which it is located or restore the
merestorasi aset pendasar ke kondisi yang underlying asset to the condition required by the
disyaratkan oleh syarat dan ketentuan sewa, terms and conditions of the lease, to the extent
sepanjang menyangkut aset hak guna, maka the costs are related to a right-of-use asset, the
biaya-biaya tersebut dimasukkan sebagai biaya costs are included in the related right-of-use
perolehan, kecuali biaya-biaya tersebut asset, unless those costs are incurred to produce
dikeluarkan untuk menghasilkan persediaan. inventories.
Aset hak guna didepresiasi selama jangka waktu Right-of-use assets are depreciated over the
yang lebih pendek antara masa sewa dan masa shorter period of lease term and useful life of the
manfaat aset pendasar. Jika sewa mengalihkan underlying asset. If a lease transfers ownership
kepemilikan aset pendasar atau biaya perolehan of the underlying asset or the cost of the right-
aset hak guna merefleksikan bahwa Grup akan of-use asset reflects that the Group expects to
mengeksekusi opsi beli, maka aset hak guna exercise a purchase option, the related right-of-
didepresiasi selama masa manfaat aset use asset is depreciated over the useful life of
pendasar. Depresiasi dimulai dari tanggal the underlying asset. The depreciation starts at
permulaan sewa. the commencement date of the lease.
Aset hak guna disajikan terpisah dalam laporan The right-of-use assets are presented as a
posisi keuangan konsolidasian. separate line in the consolidated statement of
financial position.
Grup menerapkan PSAK 236 untuk menentukan The Group applies PSAK 236 to determine
apakah terdapat penurunan nilai aset hak guna whether a right-of-use asset is impaired and
dan pencatatan atas penurunan nilai aset tetap accounts for any identified impairment loss as
seperti yang dijelaskan pada kebijakan described in the impairment of assets policy.
akuntansi atas penurunan aset.
Sewa variabel yang tidak tergantung pada suatu Variable rents that do not depend on an index or
indeks atau suku bunga, tidak dimasukkan rate are not included in the measurement of the
dalam pengukuran liabilitas sewa dan aset hak lease liability and the right-of-use asset. The
guna. Pembayaran tersebut dicatat sebagai related payments are recognized as an expense
beban pada periode kejadian atau kondisi yang in the period in which the event or condition that
memicu pembayaran tersebut terjadi dan triggers those payments occurs and are included
dimasukkan dalam ‘Lain-lain-bersih’ dalam in the line ‘Others-net’ in the consolidated
laporan laba rugi konsolidasian. statement of profit or loss.
Sebagai tindakan praktis, PSAK 106 As a practical expedient, PSAK 106 permits a
memungkinkan penyewa untuk tidak lessee not to separate non-lease components,
memisahkan komponen non-sewa, dan sebagai and instead account for any lease and associated
gantinya memperhitungkan setiap sewa dan non-lease components as a single arrangement.
komponen non-sewa terkait sebagai pengaturan The Group has not used this practical expedient.
tunggal. Grup belum menggunakan cara praktis For a contracts that contain a lease component
ini. Untuk kontrak yang mengandung komponen and one or more additional lease or non-lease
sewa dan satu atau lebih komponen sewa atau components, the Group allocates the
non-sewa tambahan, Grup mengalokasikan consideration in the contract to each lease
pertimbangan dalam kontrak untuk setiap component on the basis of the relative stand-
komponen sewa berdasarkan harga relatif alone price of the lease component and the
berdiri sendiri dari komponen sewa dan dudukan aggregate stand-alone price of the non-lease
agregat harga -sendiri komponen non-sewa. components.
Grup sebagai pesewa The Group as lessor
Grup melakukan perjanjian sewa sebagai The Group enters into lease agreements as a
pesewa sehubungan dengan beberapa kapal. lessor with respect to some of vessels.
Sewa di mana Grup sebagai pesewa Leases for which the Group is a lessor are
diklasifikasikan sebagai sewa sewa operasi. classified as operating leases. Whenever the
Ketika persyaratan sewa secara substansial terms of the lease transfer substantially all the
mengalihkan seluruh risiko dan manfaat yang risks and rewards of ownership to the lessee, the
terkait dengan kepemilikan ke penyewa, kontrak contract is classified as a operating leases.
tersebut diklasifikasikan sebagai sewa operasi.
- 68 -
Page 73
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
Penghasilan sewa dari sewa operasi diakui Rental income from operating leases is
secara garis lurus selama masa sewa yang recognized on a straight-line basis over the
relevan. Biaya langsung awal yang terjadi dalam terms of the relevant lease. Initial direct costs
menegosiasikan dan mengatur sewa operasi incurred in negotiating and arranging an
ditambahkan sebagai jumlah tercatat aset sewa operating lease are added to the carrying
dan diakui secara garis lurus selama masa sewa. amount of the leased assets and recognized on
a straight-line basis over the lease term.
Jual dan sewa-balik Sale and leaseback
Pada saat Grup mengalihkan aset ke entitas lain When the Group transfers an asset to another
dan menyewa kembali aset tersebut, Grup entity and leases that asset back, the Group
mencatat kontrak pengalihan aset dan sewa, accounts for the transfer contract and th lease,
dengan terlebih dahulu menerapkan persyaratan by first applying the requirements of PSAK 115
PSAK 115 ketika kewajiban pelaksanaan when a performance obligation is satisfied to
terpenuhi untuk menentukan apakah pengalihan determine whether the transfer of the asset is
aset tersebut dapat diakui sebagai penjualan. accounted for as a sale.
Jika pengalihan aset memenuhi persyaratan If the transfer of asset satisfies the requirements
PSAK 115 untuk dicatat sebagai penjualan aset, of PSAK 115 to be accounted for as a sale, the
maka transaksi tersebut dicatat sebagai berikut: transaction is accounted for as follows:
• Grup mengukur aset hak pakai yang timbul • The Group measures the right-of-use asset
dari sewa-balik sebesar proporsi nilai arising from the leaseback at the proportion
tercatat sebelumnya dari aset yang terkait of the previous carrying amount of the asset
dengan hak-guna yang dimiliki oleh Grup. that relates to the right-of-use assets
Oleh karena itu, Grup hanya mengakui retained by the Group. Accordingly, the
keuntungan atau kerugian yang terkait Group recognizes only the amount of any
dengan hak yang dialihkan. gain or loss that relates to the rights
transferred.
Jika nilai wajar imbalan penjualan aset tidak If the fair value of the consideration for the sale
sama dengan nilai wajar aset, atau jika of an asset does not equal the fair value of the
pembayaran sewa tidak menggunakan harga asset, or if the payments for the lease are not at
pasar, Grup membuat penyesuaian berikut market rates, the Group makes the following
untuk mengukur hasil penjualan pada nilai adjustments to measure the sale proceeds at
wajar: fair value:
• Seluruh keadaan below-market diakui • Any below-market terms accounted for as a
sebagai pembayaran di muka; dan prepayment of lease payments; and
• Seluruh keadaan above-market diakui • Any above-market terms accounted for as
sebagai tambahan pembiayaan dari lessor additional financing provided by the lessor to
kepada lessee. the lessee.
Jika pengalihan aset tidak memenuhi If the transfer of asset does not satisfy the
persyaratan PSAK 115 untuk dicatat sebagai requirements of PSAK 115 to be accounted for
penjualan, Grup tetap mengakui aset yang as a sale, the Group continues to recognize the
dialihkan dan mengakui liabilitas keuangan yang transferred asset and recognizes a financial
setara dengan hasil transfer. liability equal to the transfer proceeds.
t. Aset Tidak Berwujud t. Intangible Assets
Aset tidak berwujud yang diperoleh dari Intangible assets acquired in a business
kombinasi bisnis, diidentifikasi dan diakui combination are identified and recognized
terpisah dari goodwill apabila definisi aset tidak separately from goodwill when they satisfy the
berwujud dipenuhi dan nilai wajarnya dapat definition of an intangible asset and their fair
diukur secara andal. Biaya perolehan aset tidak value can be measured reliably. The cost of such
berwujud adalah nilai wajar pada tanggal intangible assets is their fair value at the
perolehan. Setelah pengakuan awal, aset tidak acquisition date. Subsequent to initial
berwujud yang diperoleh dari kombinasi bisnis recognition, intangible assets acquired in a
dilaporkan sebesar biaya perolehan dikurangi business combination are reported at cost less
akumulasi amortisasi dan akumulasi penurunan accumulated amortization and accumulated
nilai. impairment losses.
- 69 -
Page 74
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
Aset tidak berwujud diamortisasi dengan Intangible assets are amortized on a straight-
menggunakan metode garis lurus selama line basis over their estimated useful lives. The
estimasi masa manfaatnya. Estimasi masa estimated useful life and amortization method
manfaat dan metode amortisasi ditelaah pada are reviewed at the end of each annual reporting
setiap akhir periode laporan keuangan dan period, with the effect of any changes in
pengaruh perubahan estimasi diperhitungkan estimate being accounted for on a prospective
secara prospektif. basis.
Aset tidak berwujud atas hak pertambangan, Intangible assets, comprising of mining rights,
pengembangan sistem dan perangkat lunak system development and computer software,
komputer, dan lainnya termasuk seluruh biaya and others include all direct costs related to
langsung terkait persiapan untuk tujuan preparation of the asset for its intended use and
penggunaan dan diamortisasi selama 4 sampai is amortized over 4 to 30 years using the
30 tahun dengan menggunakan metode garis straight-line method.
lurus.
u. Goodwill u. Goodwill
Goodwill timbul atas akuisisi dari suatu bisnis Goodwill arising on an acquisition of a business
dicatat pada biaya perolehan yang ditetapkan is carried at cost as established at the date of
pada tanggal akuisisi bisnis tersebut dikurangi acquisition of the business less accumulated
akumulasi penurunan nilai, jika ada. impairment losses, if any.
Untuk tujuan uji penurunan nilai, goodwill For the purpose of impairment testing, goodwill
dialokasikan pada setiap unit penghasil kas dari is allocated to each of the Group’s cash-
Grup (atau kelompok unit penghasil kas) yang generating units (or group of cash-generating
diperkirakan memberikan manfaat dari sinergi units) expected to benefit from the synergies of
kombinasi bisnis tersebut. Unit penghasil kas the combination. A cash-generating unit to
yang telah memperoleh alokasi goodwill diuji which goodwill has been allocated is tested for
penurunan nilainya setiap tahun, atau lebih impairment annually, or more frequently when
sering jika terdapat indikasi bahwa unit there is an indication that the unit may be
penghasil kas tersebut mungkin mengalami impaired. If the recoverable amount of the cash-
penurunan nilai. Jika jumlah terpulihkan dari generating unit is less than its carrying amount,
unit penghasil kas kurang dari jumlah the impairment loss is allocated first to reduce
tercatatnya, rugi penurunan nilai dialokasikan the carrying amount of any goodwill allocated to
pertama kali untuk mengurangi jumlah tercatat the unit and then to the other assets of the unit
atas setiap goodwill yang dialokasikan pada unit pro-rata on the basis of the carrying amount of
penghasil kas dan kemudian ke aset lain dari each asset in the unit. Any impairment loss for
unit penghasil kas secara prorata berdasarkan goodwill is recognized directly in profit or loss in
jumlah tercatat dari setiap aset dalam unit the consolidated statement of profit or loss and
penghasil kas tersebut. Setiap kerugian other comprehensive income. An impairment
penurunan nilai goodwill diakui secara langsung loss recognized for goodwill is not reversed in
dalam laba rugi pada laporan laba rugi dan subsequent periods.
penghasilan komprehensif lain konsolidasian.
Rugi penurunan nilai yang diakui atas goodwill
tidak dapat dibalik pada periode berikutnya.
Pada pelepasan unit penghasil kas yang relevan, On disposal of the relevant cash-generating
jumlah yang dapat diatribusikan dari goodwill unit, the attributable amount of goodwill is
termasuk dalam penentuan laba rugi atas included in the determination of the profit or loss
pelepasan. on disposal.
Kebijakan Grup atas goodwill yang timbul dari The Group’s policy for goodwill arising on the
akuisisi entitas asosiasi dijelaskan pada acquisition of an associate is described in
Catatan 3n. Note 3n.
v. Aset Tak Berwujud - Hak Atas Tanah v. Intangible Assets - Land rights
Biaya legal pengurusan hak atas tanah pada The legal cost of land rights upon acquisition of
saat perolehan tanah tersebut diakui sebagai the land is recognized as part of the cost of land
bagian dari biaya perolehan aset tanah aset under property, plant and equipment.
tetap.
- 70 -
Page 75
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
Biaya pembaruan atau pengurusan The cost of renewal or extension of legal rights
perpanjangan hak atas tanah diakui sebagai on land is recognized as an intangible asset and
aset tak berwujud dan diamortisasi selama amortized over the period of land rights as
periode hak atas tanah sebagaimana tercantum stated in the contract or economic life of the
dalam kontrak atau umur ekonomis aset, mana asset, whichever is shorter.
yang lebih pendek.
w. Penurunan Nilai Aset Non-Keuangan w. Impairment of Non-Financial Assets
Kecuali Goodwill Except Goodwill
Pada setiap akhir periode pelaporan, Grup At the end of each reporting period, the Group
menelaah nilai tercatat aset non-keuangan review the carrying amount of non-financial
untuk menentukan apakah terdapat indikasi assets to determine whether there is any
bahwa aset tersebut telah mengalami indication that those assets have suffered an
penurunan nilai atau kemungkinan untuk impairment loss or possibility to reverse the
pemulihan atas penurunan nilai yang telah impairment that was previously recorded. If any
dicatat sebelumnya. Jika terdapat indikasi such indication exists, the recoverable amount
tersebut, jumlah terpulihkan dari aset diestimasi of the asset is estimated in order to determine
untuk menentukan tingkat kerugian penurunan the extent of the impairment loss (if any).
nilai (jika ada). Bila tidak memungkinkan untuk Where it is not possible to estimate the
mengestimasi jumlah terpulihkan atas suatu recoverable amount of an individual asset, the
aset individu, Grup mengestimasi jumlah Group estimate the recoverable amount of the
terpulihkan dari unit penghasil kas atas aset. cash generating unit to which the asset belongs.
Estimasi jumlah terpulihkan adalah nilai Estimated recoverable amount is the higher of
tertinggi antara nilai wajar dikurangi biaya fair value less cost to sell and value in use. In
pelepasan dan nilai pakai. Dalam menilai nilai assessing value in use, the estimated future
pakainya, estimasi arus kas masa depan cash flows are discounted to their present value
didiskontokan ke nilai kini menggunakan tingkat using a pre-tax discount rate that reflects
diskonto sebelum pajak yang menggambarkan current market assessments of the time value
penilaian pasar kini dari nilai waktu uang dan of money and the risks specific to the asset for
risiko spesifik atas aset yang mana estimasi arus which the estimates of future cash flows have
kas masa depan belum disesuaikan. not been adjusted.
Jika jumlah terpulihkan dari aset non-keuangan If the recoverable amount of the non-financial
(unit penghasil kas) lebih kecil dari nilai asset (cash generating unit) is less than its
tercatatnya, nilai tercatat aset (unit penghasil carrying amount, the carrying amount of the
kas) diturunkan menjadi sebesar jumlah asset (cash generating unit) is reduced to its
terpulihkan dan rugi penurunan nilai segera recoverable amount and an impairment loss is
diakui dalam laba rugi. recognized immediately against earnings.
Ketika penurunan nilai selanjutnya dibalik, When an impairment loss subsequently
jumlah tercatat aset (atau unit penghasil kas) reverses, the carrying amount of the asset (or a
ditingkatkan ke estimasi yang direvisi dari cash-generating unit) is increased to the revised
jumlah terpulihkannya, namun kenaikan jumlah estimate of its recoverable amount, but so that
tercatat tidak boleh melebihi jumlah tercatat the increased carrying amount does not exceed
ketika kerugian penurunan nilai tidak diakui the carrying amount that would have been
untuk aset (atau unit penghasil kas) pada determined had no impairment loss been
tahun-tahun sebelumnya. Pembalikan rugi recognized for the asset (or cash-generating
penurunan nilai diakui segera dalam laba rugi, unit) in prior years. A reversal of an impairment
kecuali aset yang bersangkutan disajikan pada loss is recognized immediately in profit or loss,
jumlah revaluasian, dalam hal ini pembalikan unless the relevant asset is carried at a revalued
kerugian penurunan nilai diperlakukan sebagai amount, in which case the reversal of the
kenaikan revaluasi. impairment loss is treated as a revaluation
increase.
Kebijakan akuntansi untuk penurunan nilai aset Accounting policy for impairment of financial
keuangan dijelaskan dalam Catatan 3h; assets is discussed in Note 3h; while impairment
penurunan nilai untuk goodwill dijelaskan dalam for goodwill is discussed in Note 3u.
Catatan 3u.
- 71 -
Page 76
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
x. Aset Eksplorasi dan Evaluasi x. Exploration and Evaluation Assets
Aktivitas eksplorasi dan evaluasi meliputi Exploration and evaluation activity involves the
pencarian sumber daya mineral, penentuan search for mineral resources, determination of
kelayakan teknis dan penilaian komersial atas the technical feasibility and assessment of the
sumber daya mineral spesifik. commercial viability of the mineral resource.
Pengeluaran eksplorasi dan evaluasi meliputi Exploration and evaluation expenditures
biaya yang berhubungan langsung dengan: comprise of costs that are directly attributable
to:
− perolehan hak untuk eksplorasi; − acquisition of rights to explore;
− kajian topografi, geologi, geokimia, dan − topographical, geological, geochemical and
geofisika; geophysical studies;
− pengeboran eksplorasi; − exploratory drilling;
− pemaritan dan pengambilan contoh; dan − trenching and sampling; and
− aktivitas yang terkait dengan evaluasi − activities involved in evaluating the technical
kelayakan teknis dan komersial atas feasibility and commercial viability of
penambangan sumber daya mineral. extracting mineral resources.
Biaya eksplorasi dan evaluasi yang Exploration and evaluation expenditures related
berhubungan dengan suatu area of interest to an area of interest is written off as incurred,
dibebankan pada saat terjadinya kecuali biaya unless they are capitalized and carried forward,
tersebut dikapitalisasi dan ditangguhkan, on an area of interest basis, provided one of the
berdasarkan area of interest, apabila memenuhi following conditions is met:
salah satu dari ketentuan berikut ini:
(i) biaya tersebut diharapkan dapat diperoleh (i) the costs are expected to be recouped
kembali melalui keberhasilan pengembangan through successful development and
dan eksploitasi di area of interest tersebut exploitation of the area of interest or,
atau melalui penjualan atas area of interest alternatively, by its sale; or
tersebut; atau
(ii) kegiatan eksplorasi dalam area of interest (ii) exploration activities in the area of interest
tersebut belum mencapai tahap yang have not yet reached the stage which
memungkinkan penentuan adanya permits a reasonable assessment of the
cadangan terbukti yang secara ekonomis existence or otherwise of economically
dapat diperoleh, serta kegiatan yang aktif recoverable reserves and active and
dan signifikan dalam atau berhubungan significant operations in or in relation to the
dengan area of interest tersebut masih area of interest are continuing.
berlanjut.
Biaya yang dikapitalisasi mencakup biaya-biaya Capitalized costs include costs directly related to
yang berkaitan langsung dengan aktivitas exploration and evaluation activities in the
eksplorasi dan evaluasi pada area of interest relevant area of interest. General and
yang relevan. Biaya umum dan administrasi administrative costs are allocated to an
dialokasikan sebagai aset eksplorasi atau exploration or evaluation asset only to the
evaluasi hanya jika biaya tersebut berkaitan extent that those costs can be related directly
langsung dengan aktivitas operasional pada to operational activities in the relevant area of
area of interest yang relevan. interest.
Aset eksplorasi dan evaluasi dicatat sebesar Exploration and evaluation assets are recorded
harga perolehan dikurangi kerugian penurunan at cost less impairment charges. As the asset is
nilai. Karena belum siap untuk digunakan, aset not available for use, it is not depreciated.
tersebut tidak disusutkan.
Aset eksplorasi dan evaluasi diuji penurunan Exploration and evaluation assets are assessed
nilainya ketika fakta dan kondisi for impairment if facts and circumstances
mengindikasikan adanya penurunan nilai. Aset indicate that impairment may exist. Exploration
eksplorasi dan evaluasi juga diuji penurunan and evaluation assets are also tested for
nilainya ketika terjadi penemuan cadangan impairment once commercial reserves are
komersial, sebelum aset tersebut ditransfer ke found, before the assets are transferred to
properti pertambangan. mining properties.
- 72 -
Page 77
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
y. Properti Pertambangan y. Mining Properties
Ketika biaya pengembangan lebih lanjut atas When further development expenditures are
properti pertambangan terjadi setelah incurred on a mining property after the
dimulainya aktivitas produksi, maka biaya commencement of production, the expenditures
tersebut akan ditangguhkan sebagai bagian dari are carried forward as part of the mining
properti pertambangan apabila terdapat property when it is probable that additional
kemungkinan besar manfaat ekonomi masa future economic benefits associated with the
depan tambahan sehubungan dengan biaya expenditure will flow to the Group. Otherwise
tersebut akan mengalir ke Grup. Jika tidak, these expenditures are classified as a cost of
biaya tersebut dibebankan sebagai biaya production.
produksi.
Properti pertambangan (termasuk biaya Mining properties (including exploration,
eksplorasi, evaluasi dan pengembangan, dan evaluation and development expenditures, and
pembayaran untuk memperoleh hak atas payments to acquire mineral rights and leases)
mineral dan sewa) diamortisasi menggunakan are amortized using the units-of-production
metode unit produksi, dengan perhitungan method, with separate calculations being made
terpisah untuk setiap area of interest. Basis unit for each area of interest. The units-of-
produksi menghasilkan pembebanan amortisasi production basis results in an amortization
secara proporsional berdasarkan deplesi charge proportional to the depletion of the
cadangan terbukti dan cadangan terduga. proved and probable reserves.
Properti pertambangan diuji penurunan nilai Mining properties are tested for impairment in
berdasarkan kebijakan pada Catatan 3w. accordance with the policy described in Note 3w.
z. Provisi z. Provision
Provisi diakui ketika Grup memiliki kewajiban Provisions are recognized when the Group have
kini (baik bersifat hukum maupun konstruktif) a present obligation (legal or constructive) as a
sebagai akibat peristiwa masa lalu, result of a past event, it is probable that the
kemungkinan besar Grup diharuskan Group will be required to settle the obligation,
menyelesaikan kewajiban dan estimasi yang and a reliable estimate can be made of the
andal mengenai jumlah kewajiban tersebut amount of the obligation.
dapat dibuat.
Jumlah yang diakui sebagai provisi adalah hasil The amount recognized as a provision is the best
estimasi terbaik pengeluaran yang diperlukan estimate of the consideration required to settle
untuk menyelesaikan kewajiban kini pada akhir the present obligation at the end of the reporting
periode pelaporan, dengan mempertimbangkan period, taking into account the risks and
risiko dan ketidakpastian yang meliputi uncertainties surrounding the obligation. Where
kewajibannya. Apabila suatu provisi diukur a provision is measured using the cash flows
menggunakan arus kas yang diperkirakan untuk estimated to settle the present obligation, its
menyelesaikan kewajiban kini, maka nilai carrying amount is the present value of those
tercatatnya adalah nilai kini dari arus kas. cash flows.
Ketika beberapa atau seluruh manfaat ekonomi When some or all of the economic benefits
untuk penyelesaian provisi yang diharapkan required to settle a provision are expected to be
dapat dipulihkan dari pihak ketiga, piutang recovered from a third party, a receivable is
diakui sebagai aset apabila terdapat kepastian recognized as an asset if it is virtually certain
bahwa penggantian akan diterima dan jumlah that reimbursement will be received and the
piutang dapat diukur secara andal. amount of the receivable can be measured
reliably.
aa. Pengakuan Pendapatan dan Beban aa. Revenue and Expense Recognition
Penjualan Batubara Sale of coal
Grup memperoleh pendapatan dengan The Group earns revenue by mining and
menambang dan kemudian menjual batubara subsequently selling coal by local and export to
secara lokal dan ekspor ke pelanggan dengan customers under a range of commercial terms.
berbagai persyaratan komersial.
Pendapatan dari penjualan batubara diakui Revenue from the sale of coal is recognized at
pada saat kontrol telah dialihkan kepada the point in time when control has been
pelanggan, tidak ada pekerjaan atau transferred to the customer, no further work or
- 73 -
Page 78
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
pemrosesan lebih lanjut yang diperlukan oleh processing is required by the Group, the
Grup, kuantitas dan kualitas barang telah quantity and quality of the goods has been
ditentukan dengan akurasi yang wajar, dan determined with reasonable accuracy, and
kolektibilitas cukup terjamin. Hal ini biasanya collectability is reasonably assured. This is
terjadi ketika kepemilikan berpindah. generally when title passes.
Sebagian besar perjanjian penjualan Grup The majority of the Group’s sales agreements
menetapkan bahwa kepemilikan berpindah specify that title passes when the product is
ketika barang diserahkan ke tujuan yang delivered to the destination specified by the
ditentukan oleh pelanggan, yang biasanya customer, which is typically the vessel on which
adalah kapal dimana barang akan dikirimkan. the product will be shipped. Within each contract
Dalam setiap kontrak untuk menjual barang to sell a commodity product, each unit of
komoditas, setiap barang yang dikirim adalah product shipped is a separate performance
kewajiban pelaksanaan terpisah. Pendapatan obligation. Revenue is generally recognized at
umumnya diakui pada harga kontrak yang the contracted price at this reflects the stand-
mencerminkan harga jual tersendiri. alone selling price.
Grup menjual beberapa batubara dengan CIF The Group sells certain of its coal on a CIF (Cost,
(Cost, Insurance and Freight) Incoterm, yang Insurance and Freight) Incoterm, which means
berarti bahwa Grup bertanggung jawab untuk that the Group is responsible for providing
menyediakan layanan pengiriman dan asuransi freight and insurance services after the date at
setelah tanggal dimana kepemilikan berpindah. which title of the goods passes. The Group
Oleh karena itu, Grup memiliki kewajiban therefore has separate performance obligation
pelaksanaan yang terpisah untuk pengangkutan for freight and insurance service provided for
dan layanan asuransi yang disediakan dalam sale of coal under CIF Incoterm. Freight and
penjualan batubara berdasarkan CIF Incoterm. insurance revenue is allocated from the overall
Pengangkutan dan pendapatan asuransi contract price at its stand-alone selling price
dialokasikan dari harga kontrak keseluruhan (where observable) or otherwise at its estimated
pada harga jual tersendiri (jika dapat diketahui) cost plus margin. The recognition of freight and
atau sebaliknya dengan perkiraan biaya insurance revenue is deferred, where
ditambah margin. Pengakuan pendapatan significant, until the product is delivered rather
pengiriman dan asuransi ditangguhkan, jika than when the product is shipped.
signifikan, sampai barang diserahkan bukan
saat barang dikirim.
Dalam menentukan pengakuan pendapatan, In determining revenue recognition, the Group
Grup melakukan analisis sebagai berikut: perform the following transaction analysis:
1. Mengidentifikasi kontrak dengan pelanggan 1. Identify contracts with customers that meet
yang memenuhi semua kriteria berikut: all the following criteria:
• Para pihak dalam kontrak telah • The parties to the contract have
menyetujui kontrak, approved the contract,
• Grup dapat mengidentifikasi hak setiap • The Group can identify each party’s
pihak mengenai barang atau jasa yang rights regarding the goods and services
akan dialihkan, to be transferred,
• Grup dapat mengidentifikasi jangka • The Group can identify the payment
waktu pembayaran barang dan jasa terms for the goods or services to be
yang akan dialihkan, transferred,
• Kontrak memiliki substansi komersial, • The contract has commercial substance,
dan and
• Kemungkinan besar Grup akan menagih • It is probable that the Group will collect
imbalan dalam pertukaran barang atau the consideration in exchange for the
jasa yang kan dialihkan ke pelanggan; goods or services to be transferred to the
customers;
2. Mengidentifikasi kewajiban pelaksanaan; 2. Identify performance obligations;
3. Menentukan harga transaksi; 3. Determine the transaction price;
4. Mengalokasikan harga transaksi terhadap 4. Allocate the transaction price to performance
kewajiban pelaksanaan; dan obligations; and
5. Mengakui pendapatan. 5. Recognise revenue.
- 74 -
Page 79
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
Grup mengakui pendapatan ketika kewajiban The Group recognise revenue when the
pelaksanaan telah diselesaikan dengan performance obligation has been satisfied by
mengalihkan barang atau jasa yang dijanjikan transferring a promised goods or services to the
kepada pelanggan. customer.
Pendapatan diukur berdasarkan jumlah imbalan Revenue is measured based on the
yang ditentukan dalam kontrak dan tidak consideration specified in the contract and
termasuk jumlah yang ditagih atas nama pihak excludes amounts collected on behalf of third
ketiga. parties.
Pendapatan jasa Rendering of services
Grup memperoleh pendapatan dari penyediaan The Group generates revenue from the provision
jasa penambangan, termasuk penambangan of mining services, including contract mining,
kontrak, pemindahan lapisan penutup tanah, overburden removal, and coal haulage to the
dan pengangkutan batubara ke sektor mining sector. The Group also generates
pertambangan. Grup juga memperoleh revenue from providing logistics and support
pendapatan dari penyediaan logistik dan services to the oil and gas sector.
layanan pendukung untuk sektor minyak dan
gas.
Grup membuat kontrak layanan jangka pendek The Group enters into short- and long-term
dan jangka panjang dengan pelanggan. service contracts with customers. Under the
Berdasarkan ketentuan kontrak, Grup terms of the contracts, the Group enhances
menambah aset yang dikendalikan pelanggan assets which the customers control or the
atau pelanggan secara bersamaan menerima customers simultaneously receive and consume
dan mengkonsumsi manfaat dari kinerja Grup. the benefit of the Group’s performance.
Oleh karena itu, pendapatan dari kontrak jasa Revenue from service contracts is therefore
diakui sepanjang waktu berdasarkan tahap recognized over time based on the stage of
penyelesaian kontrak pada akhir periode completion of the contract at the end of the
pelaporan. reporting period.
Tingkat penyelesaian dapat ditentukan dengan The stage of completion may be determined
metode yang dapat mengukur secara andal jasa based on methods that can reasonably measure
yang diberikan. Bergantung pada jenis jasa dan the services performed. Depending on nature of
sifat transaksi, metode tersebut dapat the service contracts the methods may include:
mencakup:
a. Survei pekerjaan yang telah dilaksanakan; a. Surveys of work performed;
b. Nilai pekerjaan yang diselesaikan ditentukan b. Value of work completed determined based
berdasarkan harga untuk setiap kegiatan on schedule of rates for each of the activities
yang dilakukan yang mengidentifikasi nilai performed which identify value for the work
pekerjaan yang dilakukan dan oleh karena performed and hence the value of the
itu nilai pendapatan harus diakui; revenue to be recognized;
c. Jasa yang dilakukan hingga saat ini sebagai c. Services performed to date as a percentage
persentase dari jumlah jasa yang telah of total services to be performed; or
dilakukan; atau
d.
d. Proporsi biaya kontrak yang timbul untuk e. d. The proportion of contract costs incurred for
pekerjaan yang dilaksanakan sampai saat ini work performed to date relative to the
relatif terhadap estimasi jumlah biaya estimated total contract costs.
kontrak.
Pendapatan dari kontrak konstruksi Revenue from construction contracts
Grup membuat kontrak konstruksi jangka The Group enters into long-term construction
panjang dengan pelanggan. Kewajiban contracts with customers. The performance
pelaksanaan keseluruhan proyek, yang diatur obligation is usually the entire project, as
dalam kontrak, mengingat bahwa jasa yang provided for in the contract, given that the
berbeda saling bergantung, terintegrasi, dan different services are highly interdependent,
ditujukan untuk transfer proyek ke pelanggan integrated, and are aimed at transferring the
project to the customer as a whole, representing
- 75 -
Page 80
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
secara keseluruhan, mewakili hasil gabungan the combined output for which the customer has
yang terdapat di kontrak oleh pelanggan. contracted.
Berdasarkan persyaratan kontrak, Grup Under the terms of the contracts, the Group
meningkatkan aset yang dikendalikan oleh enhances assets which the customers control.
pelanggan. Oleh karena itu, pendapatan dari Revenue from construction contracts is
kontrak konstruksi diakui sepanjang waktu therefore recognized over time on a cost–to–
dengan metode input biaya-ke-biaya, yaitu cost input method, i.e. based on the proportion
berdasarkan proporsi biaya kontrak yang terjadi of contract costs incurred for work performed to
untuk pekerjaan yang dilaksanakan hingga saat date relative to the estimated total contract
ini dibandingkan dengan estimasi jumlah biaya costs. Management considers that this input
kontrak. Manajemen menganggap bahwa method is an appropriate measure of the
metode ini adalah ukuran yang tepat untuk progress towards complete satisfaction of these
kemajuan dalam memenuhi kewajiban kinerja performance obligations for long-term
untuk kontrak konstruksi jangka panjang Grup. construction contracts of the Group.
Jika hasil dari kewajiban pelaksanaan tidak Where the outcome of a performance obligation
dapat diukur secara wajar, dan biaya yang cannot be reasonably measured, and the costs
terjadi dalam memenuhi kewajiban pelaksanaan incurred in satisfying the performance obligation
diperkirakan dapat dipulihkan, maka are expected to be recoverable, the revenue is
pendapatan diakui hanya sejumlah biaya yang recognized only to the extent of the costs
terjadi. incurred.
Jika kemungkinan besar biaya yang terjadi When it is probable that the cost incurred in
untuk memenuhi kewajiban pelaksanaan akan satisfying a performance obligation will exceed
melebihi pendapatan kontrak, kerugian segera the contract revenue, the expected loss is
diakui. recognized immediately.
Tidak terdapat komponen pembiayaan yang There is not considered to be a significant
signifikan dalam kontrak konstruksi karena rata- financing component in construction contracts
rata jangka waktu kredit adalah 30 hari. as the average credit term is 30 days.
Jika kewajiban pelaksanaan tidak dipenuhi If performance obligation is not satisfied over
sepanjang waktu dalam kontrak konstruksi time in a construction contract with customer,
dengan pelanggan, Grup memenuhi kewajiban the Group satisfies the performance obligation at
kinerja pada suatu titik waktu. Pendapatan a point in time. Revenue is recognized when a
diakui ketika aset atau jasa yang dijanjikan promised asset or service is transferred to a
dialihkan kepada pelanggan dan pelanggan customer and the customer obtains control on
memperoleh kendali atas aset tersebut. that asset.
Grup menyajikan saldo kontraknya, The Group presents its contract balances, on a
berdasarkan basis per kontrak, dalam posisi contract-by-contract basis, in a net contract
aset kontrak atau liabilitas bersih, secara asset or liability position, separately from its
terpisah dari piutang usaha. Aset kontrak dan trade receivables. Contract assets and trade
piutang usaha keduanya merupakan hak atas receivables are both rights to consideration in
imbalan sebagai imbalan atas barang atau jasa exchange for goods or services that the Group
yang telah dialihkan Grup kepada pelanggan. has transferred to a customer; however, the
Namun, klasifikasi tersebut bergantung pada classification depends on whether such right is
apakah hak tersebut hanya tergantung pada only conditional on the passage of time (trade
kondisi waktu (piutang usaha) atau apakah juga receivables) or if it is also conditional on
tergantung pada hal lain (aset kontrak), seperti something else (contract assets), such as the
pemenuhan kewajiban pelaksanaan selanjutnya satisfaction of further performance obligations
berdasarkan kontrak. Kewajiban kontrak adalah under the contract. A contract liability is the
jumlah kumulatif yang diterima dan piutang cumulative amount received and contractually
kontraktual oleh Grup yang melebihi hak receivable by the Group that exceeds the right
imbalan yang dihasilkan dari kinerja Grup to consideration resulting from the Group’s
berdasarkan kontrak tertentu. performance under a given contract.
Pendapatan sepeda motor listrik Sale of electric motorcycles
Grup mengaku pendapatan yang berasal dari The Group recognizes revenue from sale of
penjualan sepeda motor listrik. Pendapatan electric motorcycles. Revenue is measured
diukur berdasarkan pertimbangan yang based on the consideration specified in a
ditentukan dalam kontrak dengan pelanggan contract with a customer and excludes amounts
- 76 -
Page 81
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
dan tidak termasuk jumlah yang dikumpulkan collected on behalf of third parties. The Company
atas nama pihak ketiga. Perusahaan mengakui recognizes revenue when it transfers control of
pendapatan Ketika kendali atas produk atau a product or service to a customer. The Group
jasa kepada pelanggan dialihkan. Grup secara has generally concluded that it is the principal in
umum menyimpulkan bahwa Grup merupakan its revenue arrangements and records revenue
prinsipal dalam pengaturan pendapatannya dan on a gross basis because it typically controls the
mencatat pendapatan secara bruto karena Grup goods and services before transferring them to
mengendalikan barang dan jasa sebelum the customer.
mentransfernya ke pelanggan.
Perdagangan lainnya Other trading
Pendapatan diukur berdasarkan jumlah imbalan Revenue is measured based on the consideration
yang ditentukan dalam kontrak dan tidak specified in the contract and excludes amounts
termasuk jumlah yang ditagih atas nama pihak collected on behalf of third parties. The Group
ketiga. Grup memenuhi kewajiban kinerja pada satisfies the performance obligation at a point in
suatu titik waktu. Pendapatan diakui ketika aset time. Revenue is recognized when a promised
atau jasa yang dijanjikan dialihkan kepada asset or service is transferred to a customer and
pelanggan dan pelanggan memperoleh kendali the customer obtains control on that asset.
atas aset tersebut
Pendapatan bunga Interest revenue
Pendapatan bunga diakui berdasarkan metode Interest revenue was recognized used the
suku bunga efektif. effective interest method.
Beban Expenses
Beban diakui pada saat terjadinya. Expenses were recognized when incurred.
bb. Biaya Pinjaman bb. Borrowing Costs
Biaya pinjaman yang dapat diatribusikan secara Borrowing costs directly attributable to the
langsung dengan perolehan, konstruksi, atau acquisition, construction or production of
pembuatan aset kualifikasian, yaitu aset yang qualifying assets, which are assets that
membutuhkan waktu yang cukup lama agar necessarily take a substantial period of time to
siap untuk digunakan sesuai dengan intensinya get ready for their intended use or sale, are
atau dijual, dikapitalisasi sebagai bagian dari added to the cost of those assets, until such time
biaya perolehan aset, sampai saat dimana aset as the assets are substantially ready for their
tersebut telah siap untuk digunakan sesuai intended use or sale. Investment income earned
dengan intensinya atau dijual. Penghasilan on the temporary investment of specific
investasi atas investasi sementara dari borrowings pending their expenditure on
pinjaman tersebut sementara menunggu qualifying assets is deducted from the borrowing
pengeluaran atas aset kualifikasian dikurangkan costs eligible for capitalization.
dari biaya pinjaman yang dikapitalisasi.
Biaya pinjaman lainnya diakui sebagai beban All other borrowing costs are recognized in profit
pada periode terjadinya. or loss in the period in which they are incurred.
cc. Imbalan Paska Kerja cc. Employee Benefits
Kewajiban imbalan paska kerja Defined post-employment benefits
Grup membukukan imbalan paska kerja imbalan The Group provide defined post-employment
pasti untuk karyawannya sesuai dengan benefits to their employees in accordance with
Undang-undang Ketenagakerjaan. Tidak Labor Law. No funding has been made by the
terdapat pendanaan yang disisihkan oleh Grup Group to the defined benefit plans.
sehubungan dengan imbalan paska kerja ini.
Biaya penyediaan imbalan ditentukan dengan The cost of providing benefits is determined
menggunakan metode projected unit credit using the projected unit credit method, with
dengan penilaian aktuaria yang dilakukan pada actuarial valuations being carried out at the end
setiap akhir periode pelaporan tahunan. of each annual reporting period.
Pengukuran kembali, terdiri dari keuntungan Remeasurement, comprising actuarial gains and
- 77 -
Page 82
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
dan kerugian aktuarial, perubahan dampak losses, the effect of the changes to the asset
batas atas aset (jika ada) dan dari imbal hasil ceiling (if applicable) and the return on plan
atas aset program (tidak termasuk bunga), yang assets (excluding interest), is reflected
tercermin langsung dalam laporan posisi immediately in the consolidated statement of
keuangan konsolidasian yang dibebankan atau financial position with a charge or credit
dikreditkan ke penghasilan komprehensif lain recognized in other comprehensive income in
periode terjadinya. Pengukuran kembali diakui the period in which they occur. Remeasurement
penghasilan komprehensif lain tercermin segera recognized in other comprehensive income is
dalam saldo laba dan tidak akan direklas ke laba reflected as a separate item under other
rugi. Biaya jasa lalu diakui dalam laba rugi pada components of equity and will not be reclassified
periode amendemen program. Bunga neto to profit or loss. Past service cost is recognized
dihitung dengan mengalikan tingkat diskonto in profit or loss in the period of a plan
pada awal periode imbalan pasti dengan amendment. Net interest is calculated by
liabilitas atau aset imbalan pasti neto. Biaya applying the discount rate at the beginning of
imbalan pasti dikategorikan sebagai berikut: the period to the net defined benefit liability or
asset. Defined benefit costs are categorised as
follows:
• Biaya jasa (termasuk biaya jasa kini, biaya • Service cost (including current service cost,
jasa lalu serta keuntungan dan kerugian past service cost, as well as gains and losses
kurtailmen dan penyelesaian) on curtailments and settlements)
• Beban atau pendapatan bunga neto • Net interest expense or income
• Pengukuran kembali • Remeasurement
Grup menyajikan dua komponen pertama dari The Group present the first two components of
biaya imbalan pasti di laba rugi, Keuntungan dan defined benefit costs in profit or loss.
kerugian kurtailmen dicatat sebagai biaya jasa Curtailment gains and losses are accounted for
lalu. as past service costs.
Kewajiban imbalan pensiun yang diakui pada The retirement benefit obligation recognized in
laporan posisi keuangan konsolidasian the consolidated statement of financial position
merupakan defisit atau surplus aktual dalam represents the actual deficit or surplus in the
program imbalan pasti Grup. Surplus yang Group’ defined benefit plans. Any surplus
dihasilkan dari perhitungan ini terbatas pada resulting from this calculation is limited to the
nilai kini manfaat ekonomis yang tersedia dalam present value of any economic benefits available
bentuk pengembalian dana program dan in the form of refunds from the plans or
pengurangan iuran masa depan atas program. reductions in future contributions to the plans.
Liabilitas untuk pesangon diakui mana yang A liability for a termination benefit is recognized
terjadi lebih dulu ketika entitas tidak dapat lagi at the earlier of when the entity can no longer
menarik penawaran imbalan tersebut dan ketika withdraw the offer of the termination benefit and
entitas mengakui biaya restrukturisasi terkait. when the entity recognizes any related
restructuring costs.
Imbalan kerja jangka panjang lainnya Other long-term benefits
Perhitungan imbalan kerja jangka panjang The cost of providing long-term benefits is
ditentukan dengan menggunakan metode determined using the Projected Unit Credit
Projected Unit Credit. Biaya jasa lalu dan Method. Past service cost and actuarial gains or
keuntungan atau kerugian aktuarial diakui losses are recognized immediately in profit or
langsung pada tahun yang bersangkutan. loss.
Jumlah yang diakui sebagai liabilitas imbalan The long-term employee benefits obligation
kerja jangka panjang lainnya di laporan posisi recognized in the consolidated statements of
keuangan konsolidasian merupakan nilai kini financial position represents the present value of
kewajiban imbalan kerja jangka panjang. the long-term employee benefits obligation.
dd. Program Opsi Saham Karyawan dan dd. Employee and Management Stock Option
Manajemen Program
Program Opsi Saham Karyawan dan Manajemen Employee and Management Stock Option
(EMSOP) adalah suatu penetapan pemberian Program (EMSOP), an equity-settled share
kompensasi yang diselesaikan dengan based payment arrangement, is measured at
pemberian ekuitas berbasis saham yang the fair value of the equity instrument at grant
ditentukan sebesar nilai wajar atas instrumen date. The fair value determined at grant date is
- 78 -
Page 83
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
ekuitas tersebut pada tanggal pemberian expensed on a straight-line basis over the
kompensasi. Nilai wajar tersebut dibebankan vesting period, based on management estimate
dengan menggunakan metode garis lurus of equity instruments that will eventually vest.
selama periode vesting berdasarkan estimasi At reporting dates, management revises its
manajemen atas instrumen ekuitas tersebut estimate of the number of equity instruments
yang pada akhirnya akan diberikan. Pada setiap expected to vest. The impact of the revision of
tanggal pelaporan, pihak manajemen akan the original estimate, if any, is recognized in
merevisi estimasi atas jumlah instrumen ekuitas profit and loss over the remaining vesting
yang diharapkan akan diberikan. Jika terdapat period, with a corresponding adjustment in
pengaruh atas revisi terhadap estimasi awal akan Stock Option account under equity.
diakui dalam laba rugi selama sisa periode vesting
dengan menyesuaikan akun Opsi Saham yang
merupakan bagian dari ekuitas.
ee. Pajak Penghasilan ee. Income Tax
Beban pajak penghasilan merupakan jumlah pajak Income tax expense represents the sum of the
kini terutang dan pajak tangguhan. tax currently payable and deferred tax.
Pajak saat terutang berdasarkan laba kena The tax currently payable is based on taxable
pajak untuk suatu tahun. Laba kena pajak profit to the year. Taxable profit differs from
berbeda dari laba sebelum pajak seperti yang profit before tax as reported in the consolidated
dilaporkan dalam laporan laba rugi dan statement of profit or loss and other
penghasilan komprehensif lain karena pos comprehensive income because of items of
pendapatan atau beban yang dikenakan pajak income or expense that are taxable or
atau dikurangkan pada tahun berbeda dan pos- deductible in other years and items that are
pos yang tidak pernah dikenakan pajak atau never taxable or deductible.
tidak dapat dikurangkan.
Beban pajak kini ditentukan berdasarkan laba Current tax expense is determined based on the
kena pajak dalam periode yang bersangkutan taxable income for the year computed using
yang dihitung berdasarkan tarif pajak yang prevailing tax rates.
berlaku.
Pajak tangguhan diakui atas perbedaan Deferred tax is recognized on temporary
temporer antara jumlah tercatat aset dan differences between the carrying amounts of
liabilitas dalam laporan keuangan konsolidasian assets and liabilities in the consolidated financial
dengan dasar pengenaan pajak yang digunakan statements and the corresponding tax bases
dalam perhitungan laba kena pajak. Liabilitas used in the computation of taxable profit.
pajak tangguhan umumnya diakui untuk seluruh Deferred tax liabilities are generally recognized
perbedaan temporer kena pajak. Aset pajak for all taxable temporary differences. Deferred
tangguhan umumnya diakui untuk seluruh tax assets are generally recognized for all
perbedaan temporer yang dapat dikurangkan deductible temporary differences to the extent
sepanjang kemungkinan besar bahwa laba kena that is probable that taxable profits will be
pajak akan tersedia sehingga perbedaan available against which those deductible
temporer dapat dimanfaatkan. Aset dan temporary differences can be utilized. Such
liabilitas pajak tangguhan tidak diakui jika deferred tax assets and liabilities are not
perbedaan temporer timbul dari pengakuan recognized if the temporary differences arises
awal (bukan kombinasi bisnis) dari aset dan from the initial recognition (other than in a
liabilitas suatu transaksi yang tidak business combination) of assets and liabilities in
mempengaruhi laba kena pajak atau laba a transaction that affects neither the taxable
akuntansi. Selain itu, liabilitas pajak tangguhan profit nor the accounting profit. In addition,
tidak diakui jika perbedaan temporer timbul dari deferred tax liabilities are not recognized if the
pengakuan awal goodwill. temporary differences arises from the initial
recognition of goodwill.
Aset dan liabilitas pajak tangguhan diukur Deferred tax assets and liabilities are measured
dengan menggunakan tarif pajak yang at the tax rates that are expected to apply in the
diharapkan berlaku dalam periode ketika period in which the liability is settled or the asset
liabilitas diselesaikan atau aset dipulihkan realized, based on the tax rates (and tax laws)
berdasarkan tarif pajak (dan peraturan pajak) that have been enacted, or substantively
yang telah berlaku atau secara substantif telah enacted, by the end of the reporting period.
berlaku pada akhir periode pelaporan.
- 79 -
Page 84
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
Pengukuran aset dan liabilitas pajak tangguhan The measurement of deferred tax assets and
mencerminkan konsekuensi pajak yang sesuai liabilities reflects the tax consequences that
dengan cara Grup memperkirakan, pada akhir would follow from the manner in which the
periode pelaporan, untuk memulihkan atau Group expects, at the end of the reporting
menyelesaikan jumlah tercatat aset dan period, to recover or settle the carrying amount
liabilitasnya. of their assets and liabilities.
Jumlah tercatat aset pajak tangguhan ditelaah The carrying amount of deferred tax asset is
ulang pada akhir periode pelaporan dan reviewed at the end of each reporting period and
dikurangi jumlah tercatatnya jika kemungkinan reduced to the extent that it is no longer
besar laba kena pajak tidak lagi tersedia dalam probable that sufficient taxable profits will be
jumlah yang memadai untuk mengkompensasikan available to allow all or part of the asset to be
sebagian atau seluruh aset pajak tangguhan recovered.
tersebut.
Pajak kini dan pajak tangguhan diakui sebagai Current and deferred tax are recognized as an
beban atau penghasilan dalam laba rugi periode expense or income in profit or loss, except when
berjalan, kecuali sepanjang pajak penghasilan they relate to items that are recognized outside
yang timbul dari transaksi atau peristiwa yang of profit or loss (whether in other comprehensive
diakui, di luar laba rugi (baik dalam penghasilan income or directly in equity), in which case the
komprehensif lain maupun secara langsung di tax is also recognized outside of profit or loss, or
ekuitas), dalam hal tersebut pajak juga diakui di where they arise from the initial accounting for
luar laba rugi atau yang timbul dari akuntansi a business combination. In the case of a
awal kombinasi bisnis. Dalam kombinasi bisnis, business combination, the tax effect is included
pengaruh pajak termasuk dalam akuntansi in the accounting for the business combination.
kombinasi bisnis.
Aset dan liabilitas pajak tangguhan saling hapus Deferred tax assets and liabilities are offset
ketika entitas memiliki hak yang dapat when there is legally enforceable right to set off
dipaksakan secara hukum untuk melakukan current tax assets against current tax liabilities
saling hapus aset pajak kini terhadap liabilitas and when they relate to income taxes levied by
pajak kini dan ketika aset pajak tangguhan dan the same taxation authority on either the same
liabilitas pajak tangguhan terkait dengan pajak taxable entity or different taxable entities when
penghasilan yang dikenakan oleh otoritas there is an intention to settle its current tax
perpajakan yang sama atas entitas kena pajak assets and current tax liabilities on a net basis,
yang sama atau entitas kena pajak yang or to realize the assets and settle the liabilities
berbeda yang memiliki intensi untuk simultaneously, in each future period in which
memulihkan aset dan liabilitas pajak kini dengan significant amounts of deferred tax liabilities or
dasar neto, atau merealisasikan aset dan assets are expected to be settled or recovered.
menyelesaikan liabilitas secara bersamaan,
pada setiap periode masa depan dimana jumlah
signifikan atas aset atau liabilitas pajak
tangguhan diharapkan untuk diselesaikan atau
dipulihkan.
ff. Pajak Final ff. Final Tax
Atas pendapatan dari jasa konstruksi, kapal dan Tax expense on revenues from construction
sewa gedung dikenakan pajak penghasilan final, services, vessels and office rental are subject to
beban pajak diakui secara proporsional dengan final tax which is recognized proportionately
jumlah pendapatan menurut akuntansi yang based on the revenue recognized in the current
diakui pada periode berjalan. Selisih antara period. The difference between the final tax paid
jumlah pajak penghasilan final terutang dengan and current tax expense in profit or loss is
jumlah yang dibebankan sebagai pajak kini pada recognized as prepaid tax or tax payable.
perhitungan laba rugi diakui sebagai pajak Prepaid final tax is presented separately from
dibayar dimuka atau utang pajak. Akun pajak final tax payable.
penghasilan final dibayar dimuka disajikan
terpisah dari utang pajak penghasilan final.
gg. Laba per Saham gg. Earnings per Share
Laba per saham dasar dihitung dengan membagi Basic earnings per share is computed by dividing
laba bersih yang diatribusikan kepada pemilik net income attributable to owners of the
entitas induk dengan jumlah rata-rata
- 80 -
Page 85
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
tertimbang saham yang beredar pada tahun Company by the weighted average number of
yang bersangkutan. shares outstanding during the year.
Laba per saham dilusian dihitung dengan Diluted earnings per share is computed by
membagi laba bersih yang diatribusikan kepada dividing profit or loss attributable to owners of
pemilik entitas induk dengan jumlah rata-rata the Company by the weighted average number
tertimbang saham biasa yang telah disesuaikan of shares outstanding as adjusted for the effects
dengan dampak dari semua efek berpotensi of all dilutive potential ordinary shares.
saham biasa bersifat dilutif.
hh. Informasi Segmen hh. Segment Information
Segmen operasi diidentifikasi berdasarkan Operating segments are identified on the basis
laporan internal mengenai komponen dari Grup of internal reports about components of the
yang secara regular direview oleh “pengambil Group that are regularly reviewed by “the chief
keputusan operasional” dalam rangka operating decision maker” in order to allocate
mengalokasikan sumber daya dan menilai resources to the segments and to assess their
kinerja segmen operasi. performances.
Segmen operasi adalah suatu komponen dari An operating segment is a component of an
entitas: entity:
a) yang terlibat dalam aktivitas bisnis yang a) that engages in business activities from
mana memperoleh pendapatan dan which it may earn revenue and incur
menimbulkan beban (termasuk pendapatan expenses (including revenue and expenses
dan beban terkait dengan transaksi dengan relating to the transaction with other
komponen lain dari entitas yang sama); components of the same entity);
b) yang hasil operasinya dikaji ulang secara b) whose operating results are reviewed
regular oleh pengambil keputusan regularly by the entity’s chief operating
operasional untuk membuat keputusan decision maker to make decision about
tentang sumber daya yang dialokasikan resources to be allocated to the segments
pada segmen tersebut dan menilai and assess its performance; and
kinerjanya; dan
c) dimana tersedia informasi keuangan yang c) for which discrete financial information is
dapat dipisahkan. available.
Informasi yang digunakan oleh pengambil Information reported to the chief operating
keputusan operasional dalam rangka alokasi decision maker for the purpose of resource
sumber daya dan penilaian kinerja mereka allocation and assessment of their performance
terfokus pada kategori dari setiap produk. is more specifically focused on the category of
each product.
Kebijakan akuntansi yang digunakan dalam The accounting policies used in preparing
menyusun informasi segmen sesuai dengan segment information are the same as those
kebijakan akuntansi yang digunakan dalam used in preparing the consolidated financial
menyusun laporan keuangan konsolidasian. statements.
ii. Penyisihan Liabilitas Pengelolaan dan ii. Estimated Liability for Environmental
Reklamasi Lingkungan Hidup Management and Reclamation
Restorasi, rehabilitasi dan biaya lingkungan Restoration, rehabilitation and other
hidup lainnya yang timbul selama tahap environmental costs incurred during the
produksi dibebankan sebagai bagian dari biaya production phase of exploration are expensed as
produksi. part of production costs.
Grup memiliki liabilitas tertentu untuk restorasi The Group have certain obligations to restore
dan rehabilitasi daerah pertambangan sesudah and rehabilitate mining areas following the
produksi selesai. Grup menghitung besarnya completion of production. Such obligations are
liabilitas tersebut yang mencukupi untuk accrued, so that the accrual will be adequate to
memenuhi liabilitas yang timbul ketika produksi meet those obligations once the production
- 81 -
Page 86
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
sudah selesai. Perubahan taksiran biaya process is fully completed. Changes in
restorasi dan lingkungan hidup yang akan estimated restoration and environmental costs
terjadi dihitung secara prospektif berdasarkan to be incurred are accounted for on a
sisa umur tambang. prospective basis over the remaining life of the
mine.
Kewajiban lingkungan terdiri dari biaya-biaya The environmental obligations consist of costs
yang berkaitan dengan reklamasi tambang associated with mine reclamation during mine
selama masa operasi, penutupan tambang dan operation, mine closure and decommissioning
pembongkaran dan pemindahan fasilitas dan and demobilisation of facilities and other closure
aktivitas penutupan lainnya. activities.
Provisi untuk estimasi biaya reklamasi tambang Provision for estimated costs of mine
dan penutupan tambang dicatat pada saat: reclamation and mine closure is recorded when:
Perusahaan memiliki kewajiban hukum atau the Company has a present legal or constructive
konstruktif yang timbul sebagai akibat dari obligation as a result of past events; it is
peristiwa yang terjadi dimasa lalu; besar probable that an outflow of resources will be
kemungkinan penyelesaian kewajiban tersebut required to settle the obligation; and the
mengakibatkan arus keluar sumber daya; dan amount can be reliably estimated.
jumlahnya dapat diestimasi dengan andal.
Provisi diukur pada nilai kini dari perkiraan Provision is measured at the present value of
pengeluaran yang diperlukan untuk expenditure expected to be required to settle
menyelesaikan kewajiban, menggunakan the obligation using a pre-tax rate that reflects
tingkat diskonto sebelum pajak yang current market assessments of the time value
mencerminkan penilaian pasar atas nilai waktu of money and the risks specific to the obligation.
uang dan risiko yang terkait dengan kewajiban The increase in the provision due to passage of
tersebut. Peningkatan provisi karena berlalunya time is recognised in profit or loss under finance
waktu diakui pada laporan laba rugi sebagai charges. Changes in the estimated timing or
beban keuangan. Perubahan atas estimasi amount of the expenditure or discount rate are
waktu, jumlah pengeluaran atau tingkat accounted for as a change in the corresponding
diskonto diperlakukan sebagai perubahan atas capitalised costs. At the time where a reduction
nilai tercatat aset terkait. Pada kondisi di mana in the provision is greater than the
penurunan nilai provisi lebih besar daripada sisa undepreciated capitalised cost of the related
nilai tercatat aset terkait yang belum assets, the capitalised cost is reduced to nil and
disusutkan, nilai tercatat aset tersebut the remaining adjustment is recognised in profit
dikurangkan menjadi nihil dan penyesuaian or loss.
sisanya dicatat dalam laporan laba rugi.
Provisi untuk pembongkaran, pemindahan, dan Provision for decommissioning, demobilisation
restorasi dicatat untuk mengakui kewajiban and restoration provides for legal obligations
hukum yang berkaitan dengan penarikan aset associated with the retirement of a tangible
tetap yang berasal dari akuisisi, pembangunan long-lived asset that results from the
atau pengembangan dan/atau operasi normal acquisition, construction or development and/or
aset tetap. Penarikan aset tetap ini termasuk the normal operation of a long-lived asset. The
penjualan, peninggalan, pendaurulangan atau retirement of a long-lived asset includes its sale,
penghapusan dengan cara lain, bukan abandonment, recycling or disposal in some
dikarenakan penghentian sementara other manner, other than temporary removal
pemakaian. from service.
Untuk hal-hal yang berkaitan dengan For environmental issues that may not involve
lingkungan yang mungkin tidak berkaitan the retirement of an asset, where the Company
dengan penarikan aset, dimana Perusahaan is a responsible party and it is determined that
merupakan pihak yang bertanggung jawab atas a liability exists, and amounts can be quantified,
kewajiban tersebut dan kewajiban tersebut ada the Company accrues for the estimated liability.
dan jumlahnya bisa diukur, Perusahaan In determining whether a liability exists in
mencatat estimasi kewajiban tersebut. Dalam respect of such environmental issues, the
menentukan keberadaan kewajiban yang Company applies the criteria for liability
berkaitan dengan lingkungan tersebut, recognition under applicable accounting
Perusahaan mengacu pada kriteria pengakuan standards.
kewajiban sesuai dengan standar akuntansi
yang berlaku.
- 82 -
Page 87
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
jj. Pembagian hasil produksi jj. Sharing of production
Sebagaimana dinyatakan dalam Kontrak As stipulated in the Coal Agreement, the
Batubara, Pemerintah Indonesia berhak atas Government of Indonesia is entitled to take
13,5% dari jumlah produksi batubara KJA dari 13.5% of KJA’s total coal produced from the
hasil akhir proses produksi yang dilakukan KJA. final production processes established by KJA.
Sejak tahun 1997, KJA telah menyerahkan Since 1997, KJA has delivered the Government
bagian produksi milik Pemerintah dalam bentuk of Indonesia’s share of production in cash, in
tunai sesuai dengan Perjanjian Kerjasama accordance with its Joint Sales Contract with the
Penjualan dengan Pemerintah Indonesia yang Government of Indonesia which has been made
dibuat sesuai dengan Keputusan Presiden based on Presidential Decree No. 75/1996
No. 75/1996 tanggal 25 September 1996. dated September 25, 1996.
Pada tanggal 29 September 2017, KJA dan On September 29, 2017, KJA and the
Pemerintah Indonesia menandatangani Kontrak Government of Indonesia signed a new Joint
Penjualan Gabungan baru yang berlaku efektif Sales Contract which is effective from
mulai 1 Oktober 2017. October 1, 2017.
Dengan diterbitkannya IUPK sebagai Kelanjutan With the issuance of IUPK as a Continuation of
Operasi Kontrak/Perjanjian, maka Pemerintah the Contract/Agreement term, the Government
Indonesia berhak atas 14%-28% dari jumlah of Indonesia is entitled to take 14%-28% of
produksi batubara KJA dan sebesar 14% untuk KJA’s total coal produced and 14% for sales in
penjualan dalam hal tertentu. certain cases.
KJA mengakui bagian Pemerintah sebagai KJA recognises the Government’s share as part
pendapatan penjualan dan kewajiban of sales revenue, and the obligation to make
pembayaran ke Pemerintah diakui dengan basis payment to the Government on an accrual basis
akrual sebagai beban royalti sebagai bagian dari as royalty expense as part of cost of sales. The
beban pokok penjualan. Jumlah pembayaran amount of the cash payment has been
ditentukan dengan mengurangi biaya tertentu determined by deducting certain expenses from
dari jumlah penjualan. the sales amount.
4. PERTIMBANGAN KRITIS DAN ESTIMASI 4. CRITICAL ACCOUNTING JUDGMENT AND
AKUNTANSI YANG SIGNIFIKAN ESTIMATES
Dalam penerapan kebijakan akuntansi Grup, yang In the application of the Group’s accounting policies,
dijelaskan dalam Catatan 3, Manajemen diwajibkan which are described in Note 3, Management is
untuk membuat pertimbangan, estimasi dan asumsi required to make judgments, estimates and
tentang jumlah tercatat aset dan liabilitas yang tidak assumptions about the carrying amounts of assets
tersedia dari sumber lain. Estimasi dan asumsi terkait and liabilities that are not readily apparent from other
didasarkan pada pengalaman historis dan faktor- sources. The estimates and associated assumptions
faktor lain yang dianggap relevan. Hasil aktualnya are based on historical experience and other factors
mungkin berbeda dari estimasi tersebut. that are considered to be relevant. Actual results may
differ from these estimates.
Estimasi dan asumsi yang mendasari ditelaah secara The estimates and underlying assumptions are
berkelanjutan. Revisi estimasi akuntansi diakui dalam reviewed on an ongoing basis. Revisions to accounting
periode dimana estimasi tersebut direvisi jika revisi estimates are recognized in the period which the
hanya mempengaruhi periode tersebut, atau pada estimate is revised if the revision affects only that
periode revisi dan periode masa depan jika revisi period, or in the period of the revision and future
mempengaruhi kedua periode saat ini dan masa periods if the revision affects both current and future
depan. periods.
Pertimbangan Kritis dalam Penerapan Critical Judgments in Applying Accounting
Kebijakan Akuntansi Policies
Selain yang melibatkan estimasi (lihat dibawah), Apart from those involving estimation (see below),
tidak terdapat pertimbangan kritis yang dibuat oleh there are no critical judgments that the management
manajemen dalam proses penerapan kebijakan has made in the process of applying the Group’s
akuntansi Grup dan yang memiliki pengaruh accounting policies and that have the most significant
- 83 -
Page 88
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
signifikan terhadap jumlah yang diakui dalam laporan effect on the amounts recognised in the financial
keuangan. statements.
Sumber Utama Ketidakpastian Estimasi Key Sources of Estimation Uncertainty
Asumsi utama mengenai masa depan dan sumber The key assumptions concerning future and other key
utama ketidakpastian estimasi lainnya pada akhir sources of estimation uncertainty at the end of the
periode pelaporan, yang memiliki risiko signifikan reporting period that may have a significant risk of
yang dapat mengakibatkan penyesuaian material causing a material adjustment to the carrying
terhadap jumlah tercatat aset dan liabilitas dalam amounts of assets and liabilities within the next
periode pelaporan berikutnya dijelaskan dibawah ini: financial period are discussed below:
Perhitungan Cadangan Kerugian Calculation of Loss Allowance
Ketika mengukur ECL, Grup menggunaan informasi When measuring ECL, the Group uses reasonable and
perkiraan masa-depan yang wajar dan terdukung, supportable forward-looking information, which is
berdasarkan asumsi pergerakan masa depan atas based on assumptions for the future movement of
penentu ekonomi dan bagaimana penentu tersebut different economic drivers and how these drivers will
akan saling mempengaruhi satu dengan lainnya. affect each others.
Kerugian saat gagal bayar adalah estimasi kerugian Loss given default is an estimate of the loss arising on
yang timbul pada saat gagal bayar. Loss given default default. It is based on the difference between
dihitung dari selisih antara arus kas kontraktual dan the contractual cash flows due and those that the
arus kas yang diekspektasi diterima oleh pemberi lender would expect to receive, taking into account
pinjaman, dengan memperhitungkan arus kas dari cash flows from collateral and integral credit
penjualan agunan dan peningkatan kredit. echancements.
Probabilitas gagal bayar merupakan input utama Probability of default constitutes a key input in
dalam mengukur ECL. Probabilitas gagal bayar adalah measuring ECL. Probability of default is an estimate
estimasi kemungkinan gagal bayar selama jangka of the likelihood of default over a given time horizon,
waktu tertentu, yang perhitungannya mencakup data the calculation of which includes historical data,
historis, asumsi dan ekspektasi dari kondisi masa assumptions and expectations of future conditions.
depan.
Aset tak berwujud dan penurunan nilai goodwill Intangible asset and goodwill impairment
Akuntansi akuisisi mewajibkan penggunaan ekstensif Acquisition accounting requires extensive use of
estimasi akuntansi untuk mengalokasikan harga accounting estimates to allocate the purchase price to
pembelian dalam memastikan nilai wajar aset dan the reliable fair market values of the assets and
liabilitas yang dibeli, termasuk aset tak berwujud. liabilities purchased, including intangible assets.
Berdasarkan PSAK 103, “Kombinasi Bisnis”, goodwill Under PSAK 103, “Business Combinations”, goodwill is
tidak diamortisasi dan merupakan subyek uji not amortized and is subject to an annual impairment
penurunan nilai. testing.
Uji penurunan nilai dilakukan ketika terdapat Impairment test is performed when certain
indikator penurunan nilai tertentu. Dalam kaitannya impairment indicators are present. In case of goodwill
dengan goodwill dan aset tak berwujud, aset tersebut and intangible assets, such asset is subject to annual
adalah subyek uji penurunan nilai secara tahunan dan impairment test and whenever there is an indication
juga bila terdapat indikasi bahwa aset tersebut that such asset may be impaired; management uses
memiliki kemungkinan penurunan nilai; manajemen its judgment and assumptions in estimating the
menggunakan pertimbangannya dan asumsinya recoverable value and determining the amount of
dalam mengestimasi nilai terpulihkan dan impairment. Those assumptions include among
menentukan besaran penurunan nilai. Asumsi others, discount rate and annual revenue growth.
tersebut termasuk antara lain tingkat diskonto dan
pertumbuhan pendapatan tahunan.
Jumlah tercatat aset tak berwujud dan goodwill The carrying amount of intangible asset and goodwill
diungkapkan pada Catatan 24 dan 25. is disclosed in Notes 24 and 25.
- 84 -
Page 89
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
Liabilitas Imbalan Kerja Employee Benefits Obligation
Penentuan liabilitas imbalan paska kerja tergantung The determination of post-employment benefits
pada pemilihan asumsi tertentu yang digunakan oleh obligation is dependent on selection of certain
aktuaris dalam menghitung jumlah liabilitas tersebut. assumptions used by actuaries in calculating such
Asumsi tersebut termasuk antara lain tingkat diskonto amounts. Those assumptions include among others,
dan tingkat kenaikan gaji. Walaupun asumsi Grup discount rate and rate of salary increase. While it is
dianggap tepat dan wajar, namun perubahan believed that the Group’s assumptions are reasonable
signifikan pada kenyataannya atau perubahan and appropriate, significant differences in actual
signifikan dalam asumsi yang digunakan dapat experience or significant changes in assumptions may
berpengaruh secara signifikan terhadap liabilitas materially affect the Group’s employment benefit
imbalan paska kerja Grup. Detail atas liabilitas obligations. Details of post-employment benefits
imbalan paska kerja diungkapkan dalam Catatan 36. obligation are disclosed in Note 36.
Kontrak Konstruksi Berdasarkan Metode Construction Contracts in Progress Measured at
Persentase Penyelesaian Percentage-of-Completion
Penentuan persentase penyelesaian suatu kontrak The determination of percentage of completion of
konstruksi dalam tahap penyelesaian tergantung construction contracts in progress is dependent on the
pada pertimbangan dan estimasi engineers. judgment and estimations of the engineers. Even it is
Meskipun asumsi entitas anak dianggap tepat dan believed that the subsidiaries assumptions are
wajar, namun perubahan signifikan pada keadaan reasonable and appropriate, significant differences in
aktual atau perubahan signifikan dalam asumsi yang actual experience or significant change in
digunakan dapat berpengaruh secara signifikan assumptions may materially affect the Group’s
terhadap pengakuan pendapatan Grup. Penyajian revenue recognition. The items in the consolidated
dalam laporan keuangan konsolidasian yang terkait financial statements related to construction contracts
dengan kontrak kontruksi telah diungkapkan dalam are disclosed in Notes 8 and 40.
Catatan 8 dan 40.
- 85 -
Page 90
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31,
2023 DAN UNTUK PERIODE SEMBILAN BULAN YANG 2023 AND FOR THE NINE-MONTH PERIODS ENDED
BERAKHIR PADA TANGGAL 30 SEPTEMBER 2024 DAN 2023 SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(TIDAK DIAUDIT) (Lanjutan) (Continued)
5. KAS DAN SETARA KAS 5. CASH AND CASH EQUIVALENTS
30 September/ 31 Desember/
September 30, December 31,
2024 2023
US$ US$
Kas Cash on hand
Dollar Amerika Serikat 3.443.683 1.570.115 U.S. Dollar
Rupiah 1.184.387 1.043.730 Rupiah
Dollar Singapura 382.369 373.013 Singapore Dollar
Dollar Qatar 1.919 1.925 Qatar Dollar
Dollar Australia 1.675 1.665 Australian Dollar
Dollar India 1.011 1.020 Indian Dollar
Bank- Pihak Ketiga Cash in banks - third parties
Rupiah Rupiah
PT Bank Mandiri (Persero) Tbk 85.084.064 61.952.089 PT Bank Mandiri (Persero) Tbk
PT Bank Rakyat Indonesia (Persero) Tbk 8.458.086 3.476.025 PT Bank Rakyat Indonesia (Persero) Tbk
PT Bank DBS Indonesia 2.739.100 4.481.031 PT Bank DBS Indonesia
PT Bank Negara Indonesia (Persero) Tbk 2.397.455 2.658.619 PT Bank Negara Indonesia (Persero) Tbk
PT Bank Central Asia Tbk 474.465 168.910 PT Bank Central Asia Tbk
PT Bank Danamon Indonesia Tbk 422.005 97.457 PT Bank Danamon Indonesia Tbk
PT Bank OCBC NISP Tbk 246.266 252.880 PT Bank OCBC NISP Tbk
Standard Chartered Bank 233.570 159.562 Standard Chartered Bank
The Hongkong and Shanghai The Hongkong and Shanghai
Banking Corporation Limited 189.813 107.896 Banking Corporation Limited
PT Bank Artha Graha International Tbk 143.767 156.274 PT Bank Artha Graha International Tbk
PT Bank UOB Indonesia 85.020 128.067 PT Bank UOB Indonesia
PT Bank Woori Saudara Indonesia 1906 Tbk 60.502 59.349 PT Bank Woori Saudara Indonesia 1906 Tbk
PT Bank Sulselbar 52.308 5.162.244 PT Bank Sulselbar
PT Bank KB Bukopin Tbk 35.876 31.204 PT Bank KB Bukopin Tbk
PT Bank KEB Hana Indonesia 15.617 14.631 PT Bank KEB Hana Indonesia
PT Bank CIMB Niaga Tbk 11.461 6.972 PT Bank CIMB Niaga Tbk
PT Bank DKI 9.276 18.457 PT Bank DKI
PT Bank Syariah Indonesia Tbk 4.674 18.689 PT Bank Syariah Indonesia Tbk
Citibank, N.A 2.401 2.358 Citibank, N.A
PT Bank Maspion Indonesia Tbk 315 - PT Bank Maspion Indonesia Tbk
PT Bank BPD Bali 155 - PT Bank BPD Bali
Dollar Amerika Serikat U.S. Dollar
PT Bank Mandiri (Persero) Tbk 109.865.053 98.184.295 PT Bank Mandiri (Persero) Tbk
PT Bank Maspion Indonesia Tbk 61.920.524 - PT Bank Maspion Indonesia Tbk
PT Bank KB Bukopin Tbk 28.337.026 45.240 PT Bank KB Bukopin Tbk
PT Bank Rakyat Indonesia (Persero) Tbk 22.381.123 85.545.534 PT Bank Rakyat Indonesia (Persero) Tbk
United Overseas Bank Ltd. 9.722.330 44.226.532 United Overseas Bank Ltd.
PT Bank UOB Indonesia 5.924.697 32.833.358 PT Bank UOB Indonesia
Citibank, N.A. 4.163.797 35.404 Citibank, N.A.
PT Bank DBS Indonesia 2.661.166 89.586 PT Bank DBS Indonesia
PT Bank Rakyat Indonesia (Persero) Tbk, PT Bank Rakyat Indonesia (Persero) Tbk,
cabang Singapura 2.284.899 - Singapore branch
Standard Chartered Bank 2.114.835 2.131.736 Standard Chartered Bank
PT Bank Negara Indonesia (Persero) Tbk 1.020.068 4.530.352 PT Bank Negara Indonesia (Persero) Tbk
PT Bank Artha Graha International Tbk 879.712 886.704 PT Bank Artha Graha International Tbk
UBS AG 755.687 4.856.760 UBS AG
DBS Bank Ltd. 563.911 3.449.028 DBS Bank Ltd.
PT Bank Woori Saudara Indonesia 1906 Tbk 391.781 383.876 PT Bank Woori Saudara Indonesia 1906 Tbk
The Hongkong and Shanghai The Hongkong and Shanghai
Banking Corporation Limited 237.148 473.138 Banking Corporation Limited
PT Bank Danamon Indonesia Tbk 197.410 - PT Bank Danamon Indonesia Tbk
PT Bank KEB Hana Indonesia 194.749 34.819 PT Bank KEB Hana Indonesia
JP Morgan Chase Bank, N. A. 93.729 93.673 JP Morgan Chase Bank, N. A.
PT Bank Central Asia Tbk 39.949 30.802 PT Bank Central Asia Tbk
PT Bank Mandiri (Persero) Tbk, PT Bank Mandiri (Persero) Tbk,
cabang Singapura 26.877 - Singapore branch
PT Bank Sulselbar 2.500 - PT Bank Sulselbar
Citibank, Singapura - 8.236.553 Citibank, Singapore
Dilanjutkan 359.460.211 368.011.572 Forward
- 86 -
Page 91
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31,
2023 DAN UNTUK PERIODE SEMBILAN BULAN YANG 2023 AND FOR THE NINE-MONTH PERIODS ENDED
BERAKHIR PADA TANGGAL 30 SEPTEMBER 2024 DAN 2023 SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(TIDAK DIAUDIT) (Lanjutan) (Continued)
30 September/ 31 Desember/
September 30, December 31,
2024 2023
US$ US$
Dilanjutkan 359.460.211 368.011.572 Forward
Dollar Singapura Singapore Dollar
PT Bank UOB Indonesia 678.613 - PT Bank UOB Indonesia
DBS Bank Ltd. 455.845 331.659 DBS Bank Ltd.
United Overseas Bank Ltd. 83.040 - United Overseas Bank Ltd.
Standard Chartered Bank 11.176 11.145 Standard Chartered Bank
UBS AG 5 585.554 UBS AG
Dollar Australia Australian Dollar
The Hongkong and Shanghai The Hongkong and Shanghai
Banking Corporation Limited 81.752 78.800 Banking Corporation Limited
Euro Euro
PT Bank Negara Indonesia (Persero) Tbk 6.002 983.287 PT Bank Negara Indonesia (Persero) Tbk
JPY JPY
PT Bank Negara Indonesia (Persero) Tbk 628 2.357.015 PT Bank Negara Indonesia (Persero) Tbk
RMB RMB
Standard Chartered Bank Limited, Indonesia 1.369 - Standard Chartered Bank Limited, Indonesia
PGK PGK
PT Bank ANZ Indonesia 189 - PT Bank ANZ Indonesia
Deposito berjangka - Pihak Ketiga Time deposits - Third Parties
Rupiah Rupiah
PT Bank Rakyat Indonesia (Persero) Tbk 107.052.193 11.783.714 PT Bank Rakyat Indonesia (Persero) Tbk
PT Bank KB Bukopin Tbk 29.932.961 - PT Bank KB Bukopin Tbk
PT Bank Negara Indonesia (Persero) Tbk 7.148.454 8.236.208 PT Bank Negara Indonesia (Persero) Tbk
PT Bank Mandiri (Persero) Tbk 4.970.730 5.385.518 PT Bank Mandiri (Persero) Tbk
PT Bank Maspion Indonesia Tbk 3.302.946 - PT Bank Maspion Indonesia Tbk
PT BPR Bina Dana Cakrawala 1.446.083 1.371.784 PT BPR Bina Dana Cakrawala
PT Bank Danamon Indonesia Tbk 1.012.157 64.868 PT Bank Danamon Indonesia Tbk
PT Bank DKI 264.236 - PT Bank DKI
PT Bank Central Asia Tbk 264.236 - PT Bank Central Asia Tbk
PT Bank Syariah Indonesia Tbk - 11.092.372 PT Bank Syariah Indonesia Tbk
PT Bank Artha Graha International Tbk - 200.000 PT Bank Artha Graha International Tbk
Dollar Amerika Serikat U.S. Dollar
PT Bank KB Bukopin Tbk 68.000.000 800.000 PT Bank KB Bukopin Tbk
PT Bank Mandiri (Persero) Tbk 44.067.752 3.327.730 PT Bank Mandiri (Persero) Tbk
PT Bank KEB Hana Indonesia 40.157.244 - PT Bank KEB Hana Indonesia
PT Bank Rakyat Indonesia (Persero) Tbk 13.122.013 7.562.624 PT Bank Rakyat Indonesia (Persero) Tbk
PT Bank Rakyat Indonesia (Persero) Tbk, PT Bank Rakyat Indonesia (Persero) Tbk,
cabang Singapura 10.000.000 - Singapore branch
UBS AG 9.678.402 6.078.817 UBS AG
PT Bank Negara Indonesia (Persero) Tbk 3.864.188 8.587.055 PT Bank Negara Indonesia (Persero) Tbk
PT Bank Woori Saudara Indonesia 1906 Tbk 800.000 - PT Bank Woori Saudara Indonesia 1906 Tbk
PT Bank Artha Graha International Tbk 250.000 10.050.000 PT Bank Artha Graha International Tbk
Citibank, N.A 200.000 200.000 Citibank, N.A
PT Bank Mandiri (Persero) Tbk, PT Bank Mandiri (Persero) Tbk,
cabang Singapura - 2.070.783 Singapore branch
Dollar Australia Australian Dollar
The Hongkong and Shanghai The Hongkong and Shanghai
Banking Corporation Limited 34.369 33.915 Banking Corporation Limited
Jumlah 706.346.794 449.204.420 Total
Kas dan setara kas disetarakan dalam kelompok Cash and cash equivalents in disposal group
lepasan dimiliki untuk dijual (Catatan 14) - 100.233.622 held-for-sale (Note 14)
Kas dan setara kas dalam laporan arus kas Cash and cash equivalents in the consolidated
konsolidasian 706.346.794 549.438.042 statements of cash flows
Tingkat bunga deposito berjangka per tahun Interest rates per annum on time deposits
Rupiah 2,00% - 6,75% 2,25% - 5,00% Rupiah
Dollar Amerika Serikat 1,00% - 6,00% 1,00% - 5,60% U.S. Dollar
Dollar Australia 0,01% 0,01% Australian Dollar
- 87 -
Page 92
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31,
2023 DAN UNTUK PERIODE SEMBILAN BULAN YANG 2023 AND FOR THE NINE-MONTH PERIODS ENDED
BERAKHIR PADA TANGGAL 30 SEPTEMBER 2024 DAN 2023 SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(TIDAK DIAUDIT) (Lanjutan) (Continued)
6. ASET KEUANGAN LAINNYA 6. OTHER FINANCIAL ASSETS
30 September/ 31 Desember/
September 30, December 31,
2024 2023
US$ US$
Jaminan atas pinjaman bank Guarantee deposits for bank loans
Dollar Amerika Serikat U.S. Dollar
PT Bank Mandiri (Persero) Tbk 2.240.869 2.264.648 PT Bank Mandiri (Persero) Tbk
PT Bank Negara Indonesia (Persero) Tbk 29.566 19.047 PT Bank Negara Indonesia (Persero) Tbk
Investasi pada pihak ketiga Investments in third parties
Dollar Amerika Serikat U.S. Dollar
PT Majoris Asset Management (MAM) 10.173.126 10.393.891 PT Majoris Asset Management (MAM)
Mandiri Securities Pte. Ltd. - 43.465.509 Mandiri Securities Pte. Ltd.
Rupiah Rupiah
PT Majoris Asset Management (MAM) 2.472.388 2.504.266 PT Majoris Asset Management (MAM)
Rekening bank dibatasi penggunaannya -
pihak ketiga Restricted cash in banks - third parties
Rupiah Rupiah
PT Bank Mandiri (Persero) Tbk 668.341 656.289 PT Bank Mandiri (Persero) Tbk
Dollar Amerika Serikat U.S. Dollar
PT Bank UOB Indonesia (Catatan 54) 63.567.388 56.947.946 PT Bank UOB Indonesia (Note 54)
PT Bank Mandiri (Persero) Tbk PT Bank Mandiri (Persero) Tbk
(Catatan 54) 41.320.808 61.441.215 (Note 54)
PT Bank Rakyat Indonesia (Persero) Tbk PT Bank Rakyat Indonesia (Persero) Tbk
(Catatan 54) 40.980.495 46.539.883 (Note 54)
Citibank, N.A (Catatan 54) 20.935.953 22.879.227 Citibank, N.A (Note 54)
PT Bank KEB Hana Indonesia (Catatan 54) 9.066.250 - PT Bank KEB Hana Indonesia (Note 54)
Jumlah 191.455.184 247.111.921 Total
Dikurangi bagian yang jatuh tempo
dalam satu tahun 119.996.600 133.654.475 Less current maturities
Aset keuangan tidak lancar lainnya
(Catatan 54) 71.458.584 113.457.446 Other non-current financial assets (Note 54)
Tingkat bunga per tahun Interest rates per annum
Deposito berjangka Time deposits
Dollar Amerika Serikat 1,00% - 4,75% 1,00% - 2,00% U.S. Dollar
Rupiah 2,25% 2,25% Rupiah
Untuk tujuan penilaian penurunan nilai, investasi For purpose of impairment assessment, the
pada instrumen utang dianggap memiliki risiko kredit investments in debt securities are considered to have
yang rendah apabila rekanan untuk instrumen low credit risk as the counterparties to these
tersebut memiliki peringkat kredit minimal BBB-. Oleh instruments have a minimum BBB- credit rating.
karena itu, untuk tujuan penilaian penurunan nilai Accordingly, for the purpose of impairment
atas instrumen utang, penyisihan kerugian diukur assessment for these debts instruments, the loss
pada jumlah yang sama dengan ECL selama allowance is measured at an amount equal to
12 bulan. 12-months ECL.
Dalam menentukan ECL, manajemen telah In determining the ECL, management has taken into
memperhitungkan pengalaman historis gagal bayar, account the historical default experience, the financial
laporan keuangan rekanan, serta prospek industri position of the counterparties, as well as the future
penerbit instrumen utang di masa depan yang prospects of the industries in which the issuers of
diperoleh dari laporan pakar ekonomi, laporan analis these debt instruments obtained from economic
keuangan, dan pertimbangan berbagai sumber expert reports, financial analyst reports and
eksternal dari informasi ekonomi, baik itu aktual considering various external sources of actual and
maupun perkiraan, dalam mengestimasi probabilitas forecast economic information, as appropriate, in
gagal bayar masing-masing aset keuangan yang estimating the probability of default of each of these
terjadi dalam jangka waktu penilaian kerugian, serta financial assets occurring within their respective loss
kerugian saat gagal bayar. assessment time horizon, as well as the loss upon
default in each case.
Tidak ada perubahan dalam teknik estimasi atau There has been no change in the estimation
asumsi signifikan yang dibuat selama periode techniques or significant assumptions made during
pelaporan berjalan dalam menilai cadangan kerugian the current reporting period in assessing the loss
untuk aset keuangan tersebut. allowance for these financial assets.
- 88 -
Page 93
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31,
2023 DAN UNTUK PERIODE SEMBILAN BULAN YANG 2023 AND FOR THE NINE-MONTH PERIODS ENDED
BERAKHIR PADA TANGGAL 30 SEPTEMBER 2024 DAN 2023 SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(TIDAK DIAUDIT) (Lanjutan) (Continued)
Keuntungan atau kerugian penurunan nilai atas Gain or impairment loss on financial instruments
instrumen keuangan yang diukur pada biaya measured at amortised cost is recognised in profit or
perolehan diamortisasi diakui dalam laporan laba loss, with a corresponding adjustment to their
rugi, dengan penyesuaian ke nilai tercatatnya melalui carrying amount through the loss allowance account.
akun cadangan kerugian. Manajemen berpendapat Management believes that the ECL for other financial
bahwa ECL untuk aset keuangan lainnya tidak assets is not material.
material.
Jaminan atas pinjaman bank Guarantee deposits for bank loans
Deposito berjangka pada PT Bank Mandiri (Persero) Time deposits in PT Bank Mandiri (Persero) Tbk
Tbk sebesar US$ 2.150.000 (2023: US$ 2.150.000) amounting to US$ 2,150,000 (2023: US$ 2,150,000)
mempunyai jangka waktu 1 bulan dan digunakan has a term of one month and was used as collateral
sebagai jaminan atas fasilitas kredit yang diperoleh for credit facilities obtained by TPEC from the same
TPEC dari bank yang sama (Catatan 54). bank (Note 54).
Investasi pada pihak ketiga Investments in third parties
Mandiri Securities Pte. Ltd. Mandiri Securities Pte. Ltd.
Pada tanggal 31 Desember 2023, IECPL III dan IECPL As of December 31, 2023, IECPL III and IECPL IV
IV menempatkan dana investasi masing-masing placed funds for investments of US$42,266,000 and
sebesar US$42.266.000 dan US$1.241.000 dan US$1,241,000, respectively, and appointed Mandiri
menunjuk Mandiri Securities Pte. Ltd. sebagai Securities Pte. Ltd. as fund manager and PT Bank
manajer investasi dan PT Bank Mandiri (Persero) Tbk Mandiri (Persero) Tbk as the custodian. Unamortized
sebagai kustodian. Premium yang belum diamortisasi premium was US$ 40,018 on IECPL III’s investments
atas investasi IECPL III sebesar US$ 40.018 dan and US$ 1,473 on IECPL IV’s investments.
IECPL IV sebesar US$1.473.
Pada tanggal 7 Mei 2024, investasi IECPL III telah On May 7, 2024, IECPL III’s investments have
jatuh tempo dan dananya telah diterima secara matured and the funds were fully received on the
keseluruhan pada tanggal yang sama. same day.
Pada tanggal 18 September 2024, investasi IECPL IV On September 18, 2024, IECPL IV’s investment was
telah dikompensasi terhadap utang obligasi VII cancelled against the bonds payable Senior Notes VII
(Catatan 34). (Note 34).
MAM MAM
TS menempatkan investasi dana di MAM sebagai TS placed several investments in MAM as fund
manajer investasi. Bank kustodian untuk investasi TS manager. Custodian bank for TS’ investments are
adalah DBS. DBS.
Nilai aset bersih atas aset keuangan lainnya yang The net assets value of the other financial assets with
ditempatkan pada MAM adalah sebagai berikut: MAM are as follows:
30 September/ 31 Desember/
September 30, December 31,
2024 2023
US$ US$
TS 12.645.514 12.898.157 TS
Jumlah keuntungan (kerugian), baik yang telah dan Total realized and unrealized gain (loss) related to
belum direalisasi, terkait dengan investasi di MAM investments in MAM was disclosed in Note 43.
diungkapkan pada Catatan 43. Keuntungan Unrealized gain (loss) were recognized on the fair
(kerugian) yang belum direalisasi diakui pada nilai value from these investments.
wajar dari investasi ini.
MAM ditunjuk untuk mengelola dana Grup, untuk MAM was appointed to manage the Group funds, to
menyeimbangkan portofolio dengan acuan yang telah balance the portfolio within the designated guidelines
ditetapkan dengan membeli dan menjual instrumen by buying and selling debt instruments and equity.
utang dan ekuitas.
- 89 -
Page 94
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31,
2023 DAN UNTUK PERIODE SEMBILAN BULAN YANG 2023 AND FOR THE NINE-MONTH PERIODS ENDED
BERAKHIR PADA TANGGAL 30 SEPTEMBER 2024 DAN 2023 SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(TIDAK DIAUDIT) (Lanjutan) (Continued)
7. PIUTANG USAHA 7. TRADE ACCOUNTS RECEIVABLE
30 September/ 31 Desember/
September 30, December 31,
2024 2023
US$ US$
a. Berdasarkan Pelanggan: a. By Debtors:
Pihak Berelasi (Catatan 52) 81.693.854 80.612.755 Related Parties (Note 52)
Pihak Ketiga Third Parties
BP Berau Ltd. 26.878.955 20.933.013 BP Berau Ltd.
PT Pertamina Hulu Rokan 10.108.476 3.091.885 PT Pertamina Hulu Rokan
Lain-lain (masing-masing
dibawah US$ 5 juta) 23.404.146 15.614.959 Others (each below US$ 5 million)
Penjualan batubara Sale of coal
Pelanggan luar negeri 117.144.917 121.212.134 Foreign customers
Pelanggan dalam negeri 95.266.300 71.882.297 Domestic customers
Perdagangan lainnya Other trading
Pelanggan luar negeri 5.795.988 - Foreign customers
Pelanggan dalam negeri 26.957.683 30.908.484 Domestic customers
Jumlah 305.556.465 263.642.772 Total
Cadangan kerugian kredit (669.752) (645.382) Allowance for credit losses
Bersih 304.886.713 262.997.390 Net
Jumlah 386.580.567 343.610.145 Total
b. Berdasarkan mata uang b. Based on currency
Dollar Amerika Serikat 226.028.737 221.524.838 U.S. Dollar
Rupiah 161.221.582 122.730.689 Rupiah
Jumlah 387.250.319 344.255.527 Total
Cadangan kerugian kredit (669.752) (645.382) Allowance for credit losses
Bersih 386.580.567 343.610.145 Net
Tidak terdapat piutang retensi pada tanggal There is no outstanding retention receivable as of
30 September 2024. September 30, 2024.
Pada tanggal 1 Januari 2023, piutang usaha dari As at January 1, 2023, trade receivables from
kontrak dengan pelanggan sebesar US$ 534.324.594 contracts with customers amounted to
(setelah dikurangi cadangan kerugian kredit sebesar US$ 534,324,594 (net of loss allowance for credit
US$ 736.752). losses of US$ 736,752).
Piutang usaha dari pelanggan mempunyai jangka Trade accounts receivable from customers on sale of
waktu rata-rata kredit penjualan barang dan jasa goods and services has credit period of 30 days
antara 30 hari (2023: 30 hari). Tidak ada bunga yang (2023: 30 days). No interest is charged on trade
dibebankan pada piutang usaha. accounts receivable.
Penyisihan kerugian kredit untuk piutang usaha telah Allowance for credit losses for trade accounts
diukur sejumlah sepanjang umur ECL. ECL pada receivable has been measured at an amount equal to
piutang usaha diestimasi berdasarkan matriks provisi lifetime ECL. The ECL on trade accounts receivable
dengan mengacu pada pengalaman gagal bayar are estimated using a provision matrix by reference
debitur masa lalu dan analisis posisi keuangan debitur to past default experience of the debtor and an
saat ini, disesuaikan dengan faktor-faktor yang analysis of the debtor’s current financial position,
spesifik dari debitur, kondisi ekonomi umum industri adjusted for factors that are specific to the debtors,
di mana debitur beroperasi. general economic conditions of the industry in which
the debtors operate.
Ketika menerapkan matriks provisi pada piutang When applying a provision matrix to the Group's trade
usaha milik Grup, populasi piutang usaha accounts receivable, the population of individual trade
dikelompokkan dalam piutang yang memiliki accounts receivable were aggregated into groups of
karakteristik risiko kredit yang serupa, ditentukan receivables that share similar credit risk
dari jenis pendapatan yang dimiliki oleh Grup. Piutang characteristics, determined based on the Group
usaha tersebut dikelompokkan menjadi jasa energi, revenue stream. The trade accounts receivable are
sumber daya energi, infrastruktur energi, logistik dan grouped into energy services, energy resources,
infrastruktur, mineral, bisnis hijau, ventura digital dan energy infrastructure, logistic and infrastructure,
pendapatan lainnya. mineral, green business, digital ventures and other
revenue.
- 90 -
Page 95
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31,
2023 DAN UNTUK PERIODE SEMBILAN BULAN YANG 2023 AND FOR THE NINE-MONTH PERIODS ENDED
BERAKHIR PADA TANGGAL 30 SEPTEMBER 2024 DAN 2023 SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(TIDAK DIAUDIT) (Lanjutan) (Continued)
Tabel berikut merinci profil risiko piutang usaha The following table details the risk profile of trade
berdasarkan matriks provisi Grup. receivables based on the Group’s provision matrix.
Matriks provisi Provision matrix
30 September/ September 30, 2024
Jatuh tempo/Past due
Belum jatuh
< 30 hari/ 31 – 90 hari/ 91 – 180 hari/ > 181 hari/ Sub Jumlah/
tempo/
days days days days Sub Total
Not past due
US$ US$ US$ US$ US$ US$
Tingkat kerugian kredit ekspektasian/
Expected credit loss rate *) *) *) *) 3,20%
Estimasi jumlah tercatat bruto
pada saat gagal bayar/
Estimated total gross carrying
amount at default 286.721.787 66.204.169 8.204.503 5.188.881 20.930.979 387.250.319
ECL sepanjang umur/Lifetime ECL - - - - (669.752) (669.752)
Total/Jumlah 386.580.567
*) Sudah mendekati nol / Close to zero
31 Desember/ December 31 , 2023
Jatuh tempo/Past due
Belum jatuh
tempo/ < 30 hari/ 31 – 90 hari/ 91 – 180 hari/ > 181 hari/ Sub Jumlah/
Not past due days days days days Sub Total
US$ US$ US$ US$ US$ US$
Tingkat kerugian kredit ekspektasian/
Expected credit loss rate *) *) *) *) 3,89%
Estimasi jumlah tercatat bruto
pada saat gagal bayar/
Estimated total gross carrying
amount at default 241.776.105 74.664.383 7.254.254 3.972.435 16.588.350 344.255.527
ECL sepanjang umur/Lifetime ECL - - - - (645.382) (645.382)
Total/Jumlah 343.610.145
*) Sudah mendekati nol / Close to zero
Mutasi cadangan kerugian kredit adalah sebagai The movements in allowance for credit losses are as
berikut: follows:
30 September/ 31 Desember/
September 30, December 31,
2024 2023
US$ US$
Saldo awal periode 645.382 736.752 Balance at beginning of period
Penambahan atas akuisisi entitas anak (Catatan 1) 15.144 - Addition due to acquisition of subsidiary (Note 1)
Selisih kurs 9.226 (91.370) Translation adjustment
Saldo akhir periode 669.752 645.382 Balance at end of period
Manajemen berpendapat bahwa cadangan kerugian Management believes that allowance for credit losses
penurunan kredit piutang usaha dari pihak ketiga on trade accounts receivable from third parties is
adalah cukup, sedangkan atas piutang usaha dari adequate, while on the trade accounts receivable from
pihak berelasi, tidak dibutuhkan cadangan karena related parties, no allowance is required as
manajemen berpendapat bahwa seluruh piutang ini management believes in the collectability of these
dapat tertagih. accounts.
Pada tanggal 30 September 2024 dan 31 Desember As of September 30, 2024 and December 31, 2023,
2023, piutang usaha TPEC dari CSTS Joint Operation, TPEC’s trade account receivable from CSTS Joint
BP Berau Ltd., PT PLN Nusantara Power, PT Medco Operation, BP Berau Ltd., PT PLN Nusantara Power,
E&P, PT Shell Manufacturing Indonesia dan PT PT Medco E&P, PT Shell Manufacturing Indonesia and
Pertamina EP, dijadikan jaminan atas pinjaman bank PT Pertamina EP, were used as collateral for bank
yang diperoleh TPEC dari PT Bank Mandiri (Persero) loans obtained by TPEC from PT Bank Mandiri
Tbk. (Catatan 27). (Persero) Tbk. (Note 27).
- 91 -
Page 96
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31,
2023 DAN UNTUK PERIODE SEMBILAN BULAN YANG 2023 AND FOR THE NINE-MONTH PERIODS ENDED
BERAKHIR PADA TANGGAL 30 SEPTEMBER 2024 DAN 2023 SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(TIDAK DIAUDIT) (Lanjutan) (Continued)
Pada tanggal 31 Desember 2023, piutang usaha TPE As of December 31, 2023, TPE’s trade accounts
dari PT Pertamina Hulu Rokan dijadikan jaminan atas receivable from PT Pertamina Hulu Rokan was used
pinjaman kepada PT Bank Mandiri (Persero) Tbk as collateral for loans PT Bank Mandiri (Persero) Tbk
(Catatan 27). (Note 27).
8. ASET DAN LIABILITAS KONTRAK 8. CONTRACT ASSET AND LIABILITIES
TPEC mengadakan beberapa perjanjian dengan pihak TPEC have entered into various agreements with
berelasi dan pihak ketiga terkait dengan jasa related parties and third parties for the provision of
konstruksi (Catatan 54). various construction related services (Note 54).
30 September/ 31 Desember/ 1 Januari/
September 30, December 31, January 1,
2024 2023 2023
US$ US$ US$
Aset kontrak konstruksi - lancar 40.368.191 19.506.377 4.919.983 Construction contract assets - current
Liabilitas kontrak konstruksi - lancar (15.126.195) (10.572.038) (16.581.292) Construction contract liabilities - current
Aset Kontrak Contract Assets
Jumlah yang berkaitan dengan aset kontrak adalah Amounts relating to contract assets are balances due
saldo dari pelanggan dalam kontrak konstruksi yang from customers under construction contracts that
timbul pada saat Grup menerima pembayaran dari arise when the Group receives payments from
pelanggan sejalan dengan serangkaian pencapaian customers in line with a series of performance related
terkait kinerja. Grup sebelumnya akan mengakui aset milestones. The Group will previously have recognized
kontrak untuk setiap pekerjaan yang dilakukan. a contract asset for any work performed. Any amount
Setiap jumlah yang sebelumnya diakui sebagai aset previously recognized as a contract asset is
kontrak direklasifikasi ke piutang usaha pada saat reclassified to trade accounts receivables at the point
ditagih kepada pelanggan. at which it is invoiced to the customer.
Manajemen mengestimasi cadangan kerugian aset Management estimates the loss allowance on contract
kontrak sejumlah ECL sepanjang umur, dengan assets at an amount equal to lifetime ECL, taking into
mempertimbangkan pengalaman gagal bayar historis account the historical default experience and the
dan prospek masa depan industri pelanggan. Tidak future prospects of the customer’s industry. None of
ada jumlah tagihan kepada pelanggan yang melewati the amounts due from customers at the end of the
jatuh tempo pada akhir periode pelaporan ataupun reporting period is past due and no history of write off
historis penghapusan aset kontrak. Manajemen for contract assets. Therefore, management assessed
berpendapat bahwa tidak terdapat cadangan that there is no ECL allowance that should be made
penurunan nilai untuk aset kontrak. for contract asset.
Tidak ada perubahan dalam teknik estimasi atau There has been no change in the estimation
asumsi signifikan yang dibuat selama periode techniques or significant assumptions made during
pelaporan berjalan dalam menilai cadangan kerugian the current reporting period in assessing the loss
untuk aset keuangan tersebut. allowance for the contract assets.
Liabilitas Kontrak Contract Liabilities
Liabilitas kontrak yang berkaitan dengan kontrak Contract liabilities relating to construction contracts
konstruksi adalah saldo kepada pelanggan dalam are balances due to customers under construction
kontrak konstruksi. Hal ini timbul apabila serangkaian contracts. These arise if a particular milestone
pencapaian terkait pembayaran melebihi pendapatan payment exceeds the revenue recognised to date
yang diakui hingga saat ini berdasarkan metode cost- under the cost-to-cost method.
to-cost.
Tidak ada perubahan signifikan dalam saldo liabilitas There were no significant changes in the contract
kontrak selama periode pelaporan. liability balance during the reporting period.
Tabel berikut menunjukkan jumlah pendapatan yang The following table shows how much of the revenue
diakui pada periode pelaporan berjalan terkait recognized in these current reporting period relates to
liabilitas kontrak bawaan. Tidak ada pendapatan yang brought-forward contract liabilities. There was no
- 92 -
Page 97
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31,
2023 DAN UNTUK PERIODE SEMBILAN BULAN YANG 2023 AND FOR THE NINE-MONTH PERIODS ENDED
BERAKHIR PADA TANGGAL 30 SEPTEMBER 2024 DAN 2023 SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(TIDAK DIAUDIT) (Lanjutan) (Continued)
diakui pada periode pelaporan berjalan yang terkait revenue recognized in the current reporting period
dengan kewajiban pelaksanaan yang telah dipenuhi di that related to performance obligations that were
tahun lalu. satisfied in a prior year.
Pendapatan Grup yang telah diakui yang termasuk The Group’s revenue recognized that was included in
sebagai saldo liabilitas kontrak pada awal periode: the contract liability balance at the beginning of the
period:
2024 2023
US$ US$
Jumlah terkait dengan kontrak konstruksi 10.572.038 16.581.292 Amount related to construction cost
9. PIUTANG LAIN-LAIN 9. OTHER ACCOUNTS RECEIVABLE
30 September/ 31 Desember/
September 30, December 31,
2024 2023
US$ US$
a. Berdasarkan Pelanggan: a.By Debtors:
Pihak berelasi (Catatan 52) 17.864.282 20.375.957 Related parties (Note 52)
Pihak ketiga Third parties
Piutang pajak bahan bakar kendaraan
bermotor ("PBBKB") 9.738.565 9.552.486 Vehicle fuel tax ("PBBKB") receivable
Istar Resources Co., Ltd. 6.091.201 5.873.007 Istar Resources Co., Ltd.
PT Bara Jaya Utama 5.025.020 5.078.780 PT Bara Jaya Utama
Klaim atas royalti 5.122.502 5.083.657 Claim for royalty
Lain-lain (masing-masing dibawah
US$ 5 juta) 11.423.913 11.862.926 Others (each below US$ 5 million)
Jumlah 37.401.201 37.450.856 Total
Dikurangi cadangan kerugian kredit (292.783) - Less allowance for credit losses
Jumlah pihak ketiga 37.108.418 37.450.856 Total third parties
Jumlah 54.972.700 57.826.813 Total
Dikurangi bagian yang jatuh tempo dalam
satu tahun 31.796.514 32.372.076 Less current maturities
Piutang lain-lain - setelah dikurangi bagian Other accounts receivable - net of current
yang jatuh tempo dalam satu tahun 5.311.904 5.078.780 maturities
b. Berdasarkan mata uang b.Based on currency
Dollar Amerika Serikat 27.065.470 33.383.151 U.S. Dollar
Rupiah 28.200.013 24.443.662 Rupiah
Jumlah 55.265.483 57.826.813 Total
Cadangan kerugian kredit (292.783) - Allowance for credit losses
Bersih 54.972.700 57.826.813 Net
Mutasi cadangan kerugian kredit adalah sebagai The movements in allowance for credit losses are as
berikut: follows:
30 September/ 31 Desember/
September 30, December 31,
2024 2023
US$ US$
Saldo awal periode - 2.227.568 Balance at beginning of period
Cadangan kerugian diakui dalam laba Allowance for losses recognized in profit
rugi selama periode berjalan pada: or loss during the period on:
- Aset diterbitkan setelah dikurangi aset
yang dihentikan pengakuannya karena - Assets originated, net of those
penyelesaian 292.783 - derecognized due to settlement
- Penghapusan - (1.500.000) - Write-off
Divestasi entitas anak (Catatan 14) Divestment of a subsidiary (Note 14)
- Penghapusan - (727.568) - Write-off
Saldo akhir periode 292.783 - Balance at end of period
- 93 -
Page 98
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31,
2023 DAN UNTUK PERIODE SEMBILAN BULAN YANG 2023 AND FOR THE NINE-MONTH PERIODS ENDED
BERAKHIR PADA TANGGAL 30 SEPTEMBER 2024 DAN 2023 SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(TIDAK DIAUDIT) (Lanjutan) (Continued)
Manajemen mengestimasi cadangan kerugian Management estimates the loss allowance on other
piutang lain-lain sejumlah ECL sepanjang umur, receivables at an amount equal to lifetime ECL,
dengan mempertimbangkan pengalaman gagal taking into account the historical default experience
bayar historis dan prospek masa depan industri and the future prospects of the customer’s industry.
pelanggan.
Manajemen berpendapat bahwa cadangan kerugian Management believes that allowance for credit
penurunan kredit piutang lain-lain adalah cukup. losses on other accounts receivable is adequate.
Piutang pajak bahan bakar kendaraan bermotor Vehicle fuel tax (“PBBKB”) receivable
(“PBBKB”)
Piutang PBBKB merupakan saldo PBBKB yang telah The PBBKB tax receivables represents the balance of
dibayarkan KJA dan dapat saling hapus terhadap PBBKB paid by KJA which can be offset against
royalti. royalty.
Berdasarkan surat dari Direktorat Jenderal Pajak Based on the letter from Directorate General of
(“DJP”) tertanggal 11 Agustus 2016 yang Taxation (“DGT”) dated August 11, 2016, which
menyampaikan tindak lanjut dari hasil rapat antara informed the follow-up actions from the meeting
Kementrian Keuangan, MESDM, Badan Pengawasan result between Ministry of Finance, MoEMR, Financial
Keuangan dan Pembangunan (“BPKP”) dan Badan and Development Supervisory Board (“BPKP”) and
Pemeriksa Keuangan Republik Indonesia bahwa Audit Board of Republic of Indonesia, the Government
Pemerintah telah menyepakati bahwa PBBKB dapat has agreed that the PBBKB can be offset against
saling hapus terhadap utang royalti. royalty payable.
PT Bara Jaya Utama PT Bara Jaya Utama
Pada tanggal 4 Desember 2020, PT Bara Jaya Utama On December 4, 2020, PT Bara Jaya Utama ("BJU"),
("BJU") yang merupakan salah satu supplier ICI, one of ICI’s supplier has been declared
dinyatakan dalam status penundaan kewajiban under the suspension payment of its debt by the
pembayaran utang oleh Pengadilan Niaga pada Commercial of Surabaya District Court
Pengadilan Negeri Surabaya berdasarkan Keputusan No. 14/Pdt.Sus-PKPU/2020/PN.Niaga.Sby.
No. 14/Pdt.Sus-PKPU/2020/PN.Niaga.Sby.
Atas keputusan tersebut, ICI telah mengajukan tagihan Upon such decision, ICI has submitted its receivables
sebesar Rp 128.220.659.673. Utang tersebut akan in the amount of Rp 128,220,659,673. The debt will
dibayarkan oleh BJU kepada ICI dalam jangka waktu then be paid by BJU to ICI within a period of 8 years
8 tahun yang dimulai pada tahun 2022 dengan porsi starting in 2022 with a predetermined portion of
pembayaran tahunan yang telah ditentukan dan akan annual payments and will be paid monthly in an equal
dibayarkan secara bulanan dengan porsi yang sama portion. As of September 30, 2024, the remaining
besar. Per 30 September 2024, sisa tagihan sebesar receivables is US$ 5,025,020 (December 31, 2023:
US$ 5.025.020 (31 Desember 2023: US$ 5.078.780). US$ 5,078,780).
- 94 -
Page 99
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31,
2023 DAN UNTUK PERIODE SEMBILAN BULAN YANG 2023 AND FOR THE NINE-MONTH PERIODS ENDED
BERAKHIR PADA TANGGAL 30 SEPTEMBER 2024 DAN 2023 SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(TIDAK DIAUDIT) (Lanjutan) (Continued)
10. PERSEDIAAN 10. INVENTORIES
30 September/ 31 Desember/
September 30, December 31,
2024 2023
US$ US$
Batubara 31.191.249 22.915.424 Coal
Barang dalam perjalanan 16.923.025 4.128.948 Goods in transit
Ekstrak, minyak atsiri, dan Extracts, essential oils, and
bahan aroma kimia 7.450.965 - aroma chemicals
Kendaraan bermotor 7.095.613 9.567.847 Motor vehicles
Minyak pelumas dan bahan peledak 6.990.409 5.229.539 Lubricants and blasting materials
Suku cadang dan bahan pembantu 6.204.553 6.173.046 Spare parts and supplies
Bahan bakar diesel dan minyak 2.793.303 3.850.739 Diesel and fuels
Cangkang sawit 691.845 - Palm kernel shells
Bauksit 520.844 310.028 Bauxite
Lainnya 255.435 370.561 Others
Jumlah 80.117.241 52.546.132 Total
Penyisihan penurunan nilai persediaan (1.315.679) (1.207.125) Allowance for decline in value
Bersih 78.801.562 51.339.007 Net
Mutasi penyisihan penurunan nilai Changes in the allowance for decline
persediaan: in value are as follows:
Saldo awal 1.207.125 2.514.634 Beginning balance
Penambahan 108.554 124.277 Additions
Penghapusan - (1.431.786) Write-off
Saldo akhir 1.315.679 1.207.125 Ending balance
Manajemen berkeyakinan bahwa penyisihan nilai Management believes that the allowance for decline
penurunan persediaan cukup. in value of inventories is adequate.
Pada tanggal 30 September 2024, sebagian besar As of September 30, 2024, majority of the
persediaan, kecuali batubara dan bahan bakar diesel inventories, except for coal, diesel and fuels, have
dan minyak, telah diasuransikan terhadap semua been insured against all risks with the total coverage
risiko dengan jumlah pertanggungan sebesar of US$ 47,200,811 (December 31, 2023:
US$ 47.200.811 (31 Desember 2023: US$ 12,139,344), excluding some inventories which are
12.139.344), belum termasuk beberapa persediaan insured in lump-sum basis with insurance for property
yang diasuransikan secara bersamaan dengan and equipment (Note 22).
asuransi aset tetap (Catatan 22).
Manajemen berpendapat bahwa nilai pertanggungan Management believes that the insurance coverage is
tersebut cukup untuk menutupi kemungkinan adequate to cover possible losses on the inventories
kerugian atas persediaan yang diasuransikan. insured.
Penurunan nilai persediaan diakui sebagai pengurang The decline in the value of inventories was recognized
atas biaya persediaan dan diakui sebagai beban. as deduction to the cost of inventories and charged to
expenses.
Untuk periode sembilan bulan yang berakhir 30 For nine-months period ended September 30, 2024,
September 2024, jumlah persediaan yang diakui inventories recognized in expenses and was recorded
sebagai beban dan dicatat sebagai beban pokok as cost of contracts and goods sold amounted to
kontrak dan penjualan adalah sebesar US$ 358,778,068 (2023: US$ 298,427,349).
US$ 358.778.068 (2023: US$ 298.427.349).
- 95 -
Page 100
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31,
2023 DAN UNTUK PERIODE SEMBILAN BULAN YANG 2023 AND FOR THE NINE-MONTH PERIODS ENDED
BERAKHIR PADA TANGGAL 30 SEPTEMBER 2024 DAN 2023 SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(TIDAK DIAUDIT) (Lanjutan) (Continued)
11. PAJAK DIBAYAR DIMUKA 11. PREPAID TAXES
30 September/ 31 Desember/
September 30, December 31,
2024 2023
US$ US$
Pajak penghasilan pasal 4(2), 15, 22, 23 Income tax Articles 4(2), 15, 22, 23
Entitas anak 2.203.434 3.644.778 Subsidiaries
Pajak penghasilan badan Corporate Income Tax
Perusahaan The Company
2024 54.548 - 2024
2023 - 108.779 2023
Entitas anak Subsidiaries
2024 (Catatan 47) 2.636.587 - 2024 (Note 47)
2023 19.095.155 18.477.069 2023
2020 28.368 79.321 2020
Pajak Pertambahan Nilai (PPN) - bersih Value Added Tax (VAT) - net
Perusahaan 25.616 - The Company
KJA 32.795.795 32.032.394 KJA
IMI dan entitas anak 9.483.548 4.334.145 IMI and subsidiaries
SMI dan entitas anak 10.567.562 9.342.390 SMI and subsidiaries
TPE, TPEC dan CSTS JO 2.108.950 3.402.853 TPE, TPEC and CSTS JO
IMP dan entitas anak 1.653.583 720.008 IMP and subsidiaries
Lain-lain (masing-masing di bawah
US$1 juta) 1.066.875 593.096 Others (each below US$ 1 million)
Jumlah 81.720.021 72.734.833 Total
12. ASET BIOLOGIS 12. BIOLOGICAL ASSETS
Penilaian aset produk agrikultur kaliandra menggunakan Valuation of Calliandra agricultural product assets is
Pendekatan Pendapatan karena nilai wajar produk using the Income Approach because the fair value
agrikultur kaliandra adalah berdasarkan proyeksi agricultural products is based on projections of
pendapatan yang akan dihasilkan oleh tanaman yang income that will be generated by plants that have
sudah menghasilkan. Melalui pendekatan pendapatan, been produced. Based on the income approach, the
nilai tanaman kaliandra ditentukan berdasarkan nilai kini values of Calliandra plantations are determined based
arus kas bersih yang diperkirakan akan dapat dihasilkan on the present value of projected net cash flows that
oleh produk agrikultur selama sisa umur ekonomisnya. are expected to be generated from agricultural
Dengan metode arus kas diskonto, besaran proyeksi products for the remaining economic life. With the
arus kas bersih ditentukan tahun per tahun, dengan discounted cash flow method, the net cash flow
memperhatikan siklus hidup tanaman dan kemudian projection is determined annually, by considering the
didiskonto dengan menerapkan tingkat diskonto life cycle of Calliandra plantations, and then
(discount rate) tertentu. Akumulasi dari proyeksi arus discounted by applying a certain discount rate. The
kas bersih yang telah didiskonto (nilai kini arus kas accumulated discounted net cash flow projection
bersih) merefleksikan nilai tanaman secara keseluruhan. (present value of net cash flow) reflects the value of
Nilai tersebut berada dalam kategori pengukuran nilai entire plants. The value is within the category of fair
wajar Level 3. value measurement Level 3.
- 96 -
Page 101
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31,
2023 DAN UNTUK PERIODE SEMBILAN BULAN YANG 2023 AND FOR THE NINE-MONTH PERIODS ENDED
BERAKHIR PADA TANGGAL 30 SEPTEMBER 2024 DAN 2023 SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(TIDAK DIAUDIT) (Lanjutan) (Continued)
13. ASET LANCAR LAINNYA 13. OTHER CURRENT ASSETS
30 September/ 31 Desember/
September 30, December 31,
2024 2023
US$ US$
Uang muka Advances
Proyek 50.445.979 43.052.814 Projects
Pembelian batubara dan nikel 17.531.783 20.623.380 Purchase of coal and nickel
Pembayaran royalti 10.774.681 10.076.364 Advance royalty payments
Lain-lain (masing-masing dibawah
US$ 2 juta) 22.276.226 19.181.160 Others (each below US$ 2 million)
Investasi dalam convertible promissory Investment in convertible promissory
note note
Damon Motors Inc 5.600.000 5.149.589 Damon Motors Inc
Forest Plateau Pte. Ltd 5.000.000 5.000.000 Forest Plateau Pte. Ltd
Falaina Ptd. Ltd 3.093.750 - Falaina Ptd. Ltd
PT Exelly Elektrik Indonesia 990.884 973.015 PT Exelly Elektrik Indonesia
Others 1.779.949 1.521.448 Others
Biaya dibayar dimuka Prepaid expenses
Asuransi 5.238.379 1.874.635 Insurance
PNBP Penggunaan Kawasan Hutan 2.536.389 1.560.520 PNBP Utilization of Forest Area
Sewa - bagian jangka pendek 174.507 1.357.581 Rent - current maturities
Lain-lain 5.310.533 5.684.395 Others
Deposit 43.370 520.307 Deposits
Jumlah 130.796.430 116.575.208 Total
Uang muka proyek terutama merupakan uang muka Advance for projects mainly represents advances for
untuk partisipasi dan pengembangan bisnis dan uang participation and business expansion and advances
muka untuk kegiatan perdagangan serta uang muka for trading as well as advances to vendors related to
ke pemasok terkait proyek pekerjaan. work projects.
Uang muka pembelian batubara merupakan Advances for purchase of coal represent advance
pembayaran uang muka oleh ICI dan IETPL, entitas payments made by ICI and IETPL, subsidiaries.
anak.
Uang muka pembayaran royalti ke Pemerintah Advance for royalties payment to the Government are
terutama merupakan pembayaran uang muka oleh mainly advance payments made by KJA.
KJA.
Penyertaan atas Surat Utang Promisori yang dapat Investment in Convertible Promissory Note - Damon
dikonversi - Damon Motors Inc. Motors Inc.
Pada tanggal 25 November 2022, SMI sebagai salah On November 25, 2022, SMI as a subsidiary of the
satu entitas anak Perusahaan, melakukan investasi Company invested and participated in Damon Motors
dan penyertaan pada Damon Motors Inc (Damon), Inc (Damon), a Canadian company which is engaged
suatu perusahaan Kanada yang bergerak di bidang in manufacturing and development, marketing and
pengembangan dan manufaktur, pemasaran dan distribution of two wheeler electric vehicle. Such
distribusi kendaraan listrik roda dua. Partisipasi participation was made through investment in
tersebut dilakukan melalui penyertaan atas surat convertible promissory note at the amount of
utang promisori yang dapat dikonversi sebesar US$ 5,000,000 (“Promissory Note”). Interest rate on
US$ 5.000.000 (“Surat Utang”). Tingkat bunga Surat such Promissory Note is 8% per annum and such
Utang adalah 8% per tahun dan Surat Utang jatuh Promissory Note matured on June 30, 2024. Based on
tempo pada tanggal 30 Juni 2024. Berdasarkan the amendment agreement dated September 24,
amandemen perjanjian tanggal 24 September 2024, 2024, the parties agreed to extend the maturity date
para pihak sepakat untuk memperpanjang tanggal to October 31, 2024.
jatuh tempo menjadi 31 Oktober 2024.
- 97 -
Page 102
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31,
2023 DAN UNTUK PERIODE SEMBILAN BULAN YANG 2023 AND FOR THE NINE-MONTH PERIODS ENDED
BERAKHIR PADA TANGGAL 30 SEPTEMBER 2024 DAN 2023 SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(TIDAK DIAUDIT) (Lanjutan) (Continued)
Apabila Damon Motors Inc menerbitkan suatu efek If Damon Motors Inc issues securities in any
dalam suatu transaksi, maka Surat Utang dan bunga transaction, such unpaid Promissory Note and related
yang belum dibayarkan akan dikonversi menjadi interest will be converted into shares with valuation
saham dengan valuasi maksimal sebesar at maximum amount of US$ 350 million. And in the
US$ 350 juta. Dan dalam hal Damon Motors Inc event where Damon Motors Inc conducts initial public
melakukan pencatatan perdana (IPO), maka Surat offering (IPO), then the Promissory Note will be
Utang akan dikonversi secara otomatis menjadi automatically converted into listed shares at the same
saham yang tercatat dengan harga yang sama atau price or lower than Discounted Conversion Rate, as
lebih kecil dari Discounted Conversion Rate, further agreed in the Promissory Note Agreement.
sebagaimana diatur lebih lanjut dalam Perjanjian
Surat Utang.
Terhitung efektif sejak 30 Juni 2023, SMI dan Damon Effective June 30, 2023, SMI and Damon entered into
menandatangani amandemen perjanjian yang antara an amendment agreement which amend among
lain merevisi (1) tingkat suku bunga dari 8% menjadi others (1) interest rate from 8% to 12%, wherein
12%, dimana bunga dibayarkan pada tanggal interest to be paid on October 1, 2023 and at maturity
1 Oktober 2023 dan pada tanggal jatuh tempo serta date and (2) valuation cap to be revised to
(2) valuasi maksimal diubah menjadi US$ 125.000.000. US$ 125,000,000.
Pinjaman dalam surat promes yang dapat dikonversi Convertible Promissory Note Loan – Forest Plateau
– Forest Plateau Pte., Ltd. Pte., Ltd.
Pada tanggal 2 November 2023, PT Laras Ekosistem On November 2, 2023, PT Laras Ekosistem Organik
Organik (Laras), entitas anak Perusahaan, (Laras), a subsidiary of the Company, provided
memberikan surat utang promisori yang dapat convertible promissory note for the amount of
dikonversi sebesar US$ 5.000.000 (“Surat Utang”) US$ 5,000,000 (“Promissory Note”) to Forest Plateau
kepada Forest Plateau Pte., Ltd. (Forest Plateau), Pte. Ltd. (Forest Plateau), a Singaporean company
suatu perusahaan Singapura yang bergerak di bidang which is engaged in wholesale coffee, cocoa and tea.
perdagangan besar kopi, cokelat dan teh. Tingkat Interest rate on such Promissory Note is 3% per
bunga surat utang adalah 3% per tahun dan akan annum and will mature on August 1, 2024.
jatuh tempo pada tanggal 1 Agustus 2024.
Apabila Forest Plateau menerbitkan suatu efek dalam If Forest Plateau issues securities in any transaction,
suatu transaksi, maka Surat Utang dan bunga yang such unpaid Promissory Note and related interest will
belum dibayarkan dapat dikonversi menjadi saham be converted into shares at the same price or lower
dengan harga yang sama atau lebih kecil dari than Discounted Conversion Rate, as agreed in the
Discounted Conversion Rate, sebagaimana diatur Promissory Note Agreement.
dalam Perjanjian Surat Utang.
Sampai dengan tanggal penerbitan laporan keuangan As of the issuance date of the consolidated financial
konsolidasian, Laras dan Forest Plateau masih statements, Laras and Forest Plateau are still
melakukan diskusi terkait dengan tahap selanjutnya discussing about the next steps of the agreement post
dari perjanjian setelah jatuh tempo pada tanggal 1 its expiry on August 1, 2024.
Agustus 2024.
Penyertaan atas Surat Utang Promisori yang dapat Investment in Convertible Promissory Note – Falaina
dikonversi – Falaina Pte. Ltd. Pte. Ltd.
Pada tanggal 3 Januari 2024, Indika Ventures Pte. On January 3, 2024, Indika Ventures Pte. Ltd., a
Ltd., perusahaan yang dimiliki sepenuhnya oleh wholly owned subsidiary of the Company, signed a
Perusahaan telah menandatangani Convertible Note Convertible Note with Falaina Pte. Ltd. (Falaina)
dengan Falaina Pte. Ltd. (Falaina) sebesar amounting to US$3,000,000. Subscription to this
US$3.000.000. Penyertaan atas Convertible Note ini Convertible Note is secured with a share charge over
dijamin dengan share charge sejumlah 7.725.000 7,725,000 shares held by Mr. Sivachantiran
saham oleh Mr. Sivachantiran Belasamy, pemegang Belasamy, a shareholder of Falaina, which represents
saham dari Falaina yang mewakili 30% jumlah saham 30% of total shares in Falaina.
di Falaina.
Convertible Note ini memiliki bunga 5% per tahun This Convertible Note has a 5% interest per annum,
yang akan dibayarkan pada saat jatuh tempo, di that is due and payable on the maturity date, where
mana Convertible Note ini akan jatuh tempo pada the Convertible Note shall mature on January 3,
tanggal 3 Januari 2026. 2026.
- 98 -
Page 103
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31,
2023 DAN UNTUK PERIODE SEMBILAN BULAN YANG 2023 AND FOR THE NINE-MONTH PERIODS ENDED
BERAKHIR PADA TANGGAL 30 SEPTEMBER 2024 DAN 2023 SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(TIDAK DIAUDIT) (Lanjutan) (Continued)
14. ASET TIDAK LANCAR YANG DIMILIKI UNTUK 14. NON-CURRENT ASSETS HELD-FOR-SALE
DIJUAL
30 September/ 31 Desember/
September 30, December 31,
2024 2023
US$ US$
Divestasi TCG 295.680 - Divestment of TCG
Divestasi MUTU - 258.352.413 Divestment of MUTU
Divestasi MEA - - Divestment of MEA
Aset tetap (Catatan 22) - 5.650.064 Property, plant and equipment (Note 22)
Jumlah 295.680 264.002.477 Total
Divestasi TCG Divestment of TCG
Pada tanggal 5 Juli 2024, TCG (entitas anak) membuat On July 5, 2024, TCG (a subsidiary) has made
pengumuman koran bahwa seluruh pemegang saham announcement in newspaper that all of TCG’s
TCG bermaksud untuk menjual seluruh kepemilikan shareholders intend to sell all of their ownership in
saham mereka di TCG kepada pihak ketiga, tunduk TCG to a third party, subject to receipt of written
kepada penerimaan keberatan tertulis dari kreditur objection from any creditors or third parties within 14
atau pihak ketiga lainnya dalam waktu 14 hari setelah days after the announcement. This announcement is
pengumuman. Pengumuman ini dibuat untuk made to comply with Law No. 40 year 2007 regarding
memenuhi Undang-Undang No. 40 tahun 2007 Limited Liability Company and its amendments.
tentang Perseroan Terbatas dan perubahannya.
Berdasarkan nilai pasar indikatif investasi, IMP selaku Based on indicative market value of the investment,
pemegang saham TCG, telah mengantisipasi kerugian IMP as the shareholder of TCG, has anticipated a loss
divestasi dan mencadangkan estimasi provisi on divestment and provide estimated provision for
penurunan nilai sebesar US$ 2.077.946 per 30 Juni impairment at the amount of US$ 2,077,946 as of
2024. June 30, 2024.
Kelompok aset dan liabilitas utama TCG per tanggal Major classes of assets and liabilities of TCG as of
30 Juni 2024 adalah sebagai berikut: June 30, 2024 are as follows:
30 Juni/
June 30,
2024
US$
Aset lancar 96.368 Current assets
Goodwill 1.224.188 Goodwill
Aset tidak berwujud - bersih 2.477.053 Intangible assets - net
Aset tidak lancar lainnya 1.130.481 Other non-current assets
Liabilitas lancar 48.309 Current liabilities
Liabilitas pajak tangguhan 544.952 Deferred tax liabilities
Liabilitas tidak lancar lainnya 5.352 Other non-current liabilities
Kepentingan non-pengendali 621.058 Non-controlling interest
Aset bersih yang dilepaskan 3.708.419 Net assets divested
Harga Transaksi 1.630.473 Transaction Price
Kerugian penurunan nilai 2.077.946 Impairment loss
Kerugian penurunan nilai dialokasikan terlebih dahulu The impairment loss was allocated first to reduce the
untuk mengurangi nilai tercatat goodwill yang carrying amount of goodwill allocated to the unit and
dialokasikan ke unit tersebut dan kemudian ke aset then to intangible assets and the associated deferred
tidak berwujud beserta dengan liabilitas pajak tax liabilities. Details of impairment allocation to
tangguhan terkait. Rincian alokasi penurunan nilai goodwill was US$1,224,188 (Note 25) and intangible
atas goodwill sebesar US$1.224.188 (Catatan 25) dan assets of US$853,758 (Note 24), netting off with the
aset tidak berwujud sebesar US$853.758 (Catatan associated deferred tax liability of US$174,856 (Note
24), dikurangi dengan liabilitas pajak tangguhan 47).
terkait sebesar US$174.856 (Catatan 47).
- 99 -
Page 104
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31,
2023 DAN UNTUK PERIODE SEMBILAN BULAN YANG 2023 AND FOR THE NINE-MONTH PERIODS ENDED
BERAKHIR PADA TANGGAL 30 SEPTEMBER 2024 DAN 2023 SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(TIDAK DIAUDIT) (Lanjutan) (Continued)
Selanjutnya, pada tanggal 26 September 2024, IMP On 26 September 2024, IMP signed the Conditional
menandatangani Perjanjian Pengikatan Jual Beli Sale Purchase Agreement with PT Barito Pacific
Saham Bersyarat dengan PT Barito Pacific Lumber Lumber (“BPL”) and/or its related companies (the
("BPL") dan/atau pihak berelasi ("Pembeli"), “Purchasers”), in relation to the sale of all shares of
mengenai pengalihan seluruh saham milik IMP di TCG IMP in TCG in the amount of 6,332 shares
sebesar 6.332 lembar saham yang mewakili 80% representing 80% ownership in TCG to the
kepemilikan di TCG kepada Pembeli ("Transaksi"). Purchasers (the “Transaction”).
Nilai yang disepakati untuk Transaksi adalah sebesar Agreed consideration for the Transaction is
Rp26.774.000.000, yang akan diselesaikan melalui Rp26,774,000,000, which will be conducted in two
dua tahap: stages:
1. Tahap I dengan nilai Rp22.298.000.000 untuk 1. Stage I in the amount of Rp22,298,000,000 for
nilai pengalihan hak atas uang muka the transfer of rights over capital advance and
penyetoran modal dan pengalihan 60% saham the 60% sale of shares of IMP to the BPL, which
IMP kepada BPL yang telah selesai was completed on September 26, 2024 and
dilaksanakan pada tanggal 26 September 2024 concluded through Share Sale Purchase
dan telah tertuang dalam Perjanjian Jual Beli Agreement; and
Saham; dan
2. Tahap II dengan nilai Rp4.476.000.000 untuk 2. Stage II in the amount of Rp4,476,000,000 for
pengalihan 20% saham IMP kepada Pembeli the 20% sale of shares of IMP to the Purchasers
dan dicatat sebagai bagian dari aset tidak and was presented as part of non-currents held
lancar yang dimiliki untuk dijual sebesar for sale of US$295,680 as of September 30,
US$295.680 pada tanggal 30 September 2024. 2024.
Transaksi ini tidak akan berdampak terhadap kegiatan This Transaction will not have an impact on the
operasional, hukum, kondisi keuangan, atau operational activities, legal, financial condition, or
kelangsungan usaha Perusahaan. business continuity of the Company.
Perusahaan berkeyakinan bahwa Transaksi dilakukan The Company believes that the Transaction is made
sesuai dengan strategi bisnis diversifikasi Perusahaan in accordance with the Company’s diversification
serta untuk memastikan agar Perusahaan fokus pada strategy and to ensure that the Company focuses on
pelaksanaan kegiatan usaha yang berkelanjutan. the implementation of sustainability of the business
activities of the Company.
Divestasi MUTU Divestment of MUTU
Pada tanggal 22 September 2023, PT Indika Indonesia On September 22, 2023, PT Indika Indonesia
Resources (“IIR”) dan Indika Capital Investment Pte. Resources (“IIR”) and Indika Capital Investment Pte.
Ltd. (“ICI”), bersama-sama sebagai Penjual, telah Ltd. (“ICI”), both as Sellers, have entered into a
menandatangani suatu Perjanjian Jual Beli Bersyarat Conditional Sale and Purchase Agreement with
dengan PT Petrindo Jaya Kreasi Tbk. (“PJK”) dan/atau PT Petrindo Jaya Kreasi Tbk. (“PJK”) and/or its
afiliasinya, selaku pembeli, sehubungan dengan affiliates, as the purchaser, with regards to the
rencana penjualan seluruh saham milik IIR dan ICI di proposed sale of all shares of IIR and ICI in PT Multi
PT Multi Tambangjaya Utama (“MUTU”) kepada PJK Tambangjaya Utama (“MUTU”) to PJK (“CSPA”).
(“CSPA”).
Berdasarkan CSPA tersebut, (i) Para Penjual With regards to the CSPA, (i) the Sellers wish to sell
bermaksud untuk menjual keseluruhan all of their 2,263,030,000 shares representing the
2.263.030.000 lembar saham yang mewakili 100% Company’s 100% indirect ownership in MUTU to PJK
kepemilikan tidak langsung Perusahaan di MUTU (Share Sale) and (ii) ICI wishes to assign all of its
kepada PJK (Penjualan Saham) dan (ii) ICI bermaksud rights and obligations under the Marketing Services
untuk mengalihkan seluruh hak dan kewajibannya Agreement to PJK (Assignment of Marketing Rights,
berdasarkan Perjanjian Jasa Pemasaran kepada PJK along with the Share Sale, Transaction).
(Pengalihan Hak Pemasaran, bersama-sama dengan
Penjualan Saham, Transaksi).
Nilai yang disepakati untuk Transaksi adalah sebesar Agreed consideration for the Transaction is in the
jumlah nilai US$ 218.000.000, dimana pada tanggal total amount of US$ 218,000,000, wherein on
2 Oktober 2023, IIR telah menerima uang muka October 2, 2023, IIR received an advance payment
pembayaran sebesar Rp 154.518.000.000 (setara of Rp 154,518,000,000 (equivalent to
dengan US$ 10.000.000) dari PJK. US$ 10,000,000) from PJK.
- 100 -
Page 105
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31,
2023 DAN UNTUK PERIODE SEMBILAN BULAN YANG 2023 AND FOR THE NINE-MONTH PERIODS ENDED
BERAKHIR PADA TANGGAL 30 SEPTEMBER 2024 DAN 2023 SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(TIDAK DIAUDIT) (Lanjutan) (Continued)
Kelompok aset dan liabilitas utama MUTU per tanggal Major classes of assets and liabilities of MUTU as of
31 Desember 2023 adalah sebagai berikut: December 31, 2023 are as follows:
Nilai/Amount
US$
Kas dan setara kas 100.233.622 Cash and cash equivalents
Aset keuangan lainnya 23.002.656 Other financial assets
Piutang usaha - bersih 12.665.030 Trade accounts receivable - net
Piutang lain-lain 9.569 Other accounts receivable
Persediaan 7.824.408 Inventories
Pajak dibayar dimuka*) 15.609.546 Prepaid taxes*)
Aset lancar lainnya 1.431.049 Other current assets
Aset eksplorasi dan evaluasi - bersih 8.974.570 Exploration and evaluation assets - net
Properti pertambangan - bersih 13.475.360 Mining properties - net
Aset aktivitas pengupasan lapisan tanah 1.096.078 Stripping activity assets
Aset tetap - bersih 35.254.156 Property, plant and equipment - net
Aset hak guna - bersih 378.801 Right-of-use-assets - net
Aset tidak berwujud - bersih 38.354.366 Intangible assets - net
Uang jaminan 43.202 Refundable deposit
Total aset yang diklasifikasikan Total asset classified as
tersedia untuk dijual 258.352.413 held-for-sale
Utang usaha (7.281.507) Trade accounts payable
Utang lain-lain (560.920) Other accounts payable
Biaya yang masih harus dibayar (24.405.701) Accrued expenses
Utang pajak (6.828.889) Taxes payable
Liabilitas lancar lainnya (9.895) Other current liabilities
Liabilitas imbalan kerja (559.283) Employee benefit obligation
Liabilitas pajak tangguhan (6.101.474) Deferred tax liabilities
Provisi rehabilitasi tambang, penutupan Provision for mine rehabilitation, mine closure
tambang dan pembongkaran (1.238.708) and decommissioning
Liabilitas tidak lancar lainnya (378.800) Other non-current liabilities
Total liabilitas yang diklasifikasikan tersedia
untuk dijual (47.365.177) Total liabilities classified as held-for-sale
Aset bersih grup yang dilepas 210.987.236 Net assets of disposal group
*) Saldo pajak dibayar dimuka termasuk pembayaran *) Prepaid taxes include land and building tax
Pajak Bumi dan Bangunan (PBB) sebesar (PBB) amounted to US$ 2,323,817. In June
US$ 2.323.817. Pada bulan Juni 2023, MUTU 2023, MUTU received a Notice of Tax Due
menerima Surat Pemberitahuan Pajak Terutang (SPPT) for 2023 land and building tax
(SPPT) untuk PBB tahun 2023 sebesar amounting to Rp 83,799,848,588, which was
Rp 83.799.848.588, yang mana berbeda dengan different from the MUTU's calculation. MUTU
perhitungan MUTU. MUTU telah melakukan has made payments for the SPPT in November
pembayaran atas SPPT tersebut pada bulan and December 2023. MUTU did not agree to the
November dan Desember 2023. MUTU tidak SPPT and filed a appeal to the tax court in
menyetujui SPPT dan mengajukan gugatan ke December 2023 for a value of Rp
pengadilan pajak pada bulan Desember 2023 untuk 35,823,970,929 or the equivalent of
nilai sebesar Rp 35.823.970.929 atau setara dengan US$ 2,323,817. As of the date of issuance of
US$ 2.323.817. Sampai dengan tanggal penerbitan these consolidated financial statements, the
laporan keuangan konsolidasian ini, proses gugatan appeal process is still ongoing.
tersebut masih berjalan.
Pada tanggal 26 Februari 2024, IIR, ICI dan PJK On February 26, 2024, IIR, ICI and PJK and/or its
dan/atau afiliasinya telah menyelesaikan Penjualan affiliates have completed the Share Sale, as a
Saham, sebagai kelanjutan dari terpenuhinya seluruh continuation of the completion of all the conditions
prasyarat pendahuluan dari CSPA, termasuk precedent in the CSPA, including approval from
persetujuan dari Kementerian Energi dan Sumber Daya Ministry of Mines and Energy of the Republic of
Mineral Republik Indonesia (ESDM) untuk Penjualan Indonesia (ESDM) for Share Sale through its letter
Saham melalui surat ESDM tertanggal 15 Februari 2024. dated February 15, 2024. Total transaction amount
Jumlah nilai transaksi atas Penjualan Saham adalah for Share Sale is US$203,000,000.
US$203.000.000.
Lebih lanjut, ICI dan PJK juga telah menyelesaikan Further, ICI and PJK also have completed the
pengalihan seluruh hak dan kewajiban ICI berdasarkan transfer of all ICI’s rights and obligations under the
Perjanjian Jasa Pemasaran kepada PJK dengan nilai Marketing Service Agreement to PJK for a
sebesar US$ 15.000.000, efektif pada tanggal 4 Maret consideration of US$ 15,000,000 effective on
2024. March 4, 2024.
- 101 -
Page 106
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31,
2023 DAN UNTUK PERIODE SEMBILAN BULAN YANG 2023 AND FOR THE NINE-MONTH PERIODS ENDED
BERAKHIR PADA TANGGAL 30 SEPTEMBER 2024 DAN 2023 SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(TIDAK DIAUDIT) (Lanjutan) (Continued)
Sebagaimana diatur di dalam CSPA, penyelesaian As governed under the CSPA, the completion of the
Penjualan Saham MUTU dan pengalihan Perjanjian Jasa Shares Sale of MUTU and the transfer of Marketing
Pemasaran oleh ICI kepada PJK juga tunduk pada Rights Agreement of ICI to PJK shall also be
penilaian pengurangan yang dilakukan oleh konsultan subject to further leakage assessment conducted
keuangan pihak ketiga yang ditunjuk secara bersama- by an independent third party financial consultant,
sama oleh IIR dan PJK. which is jointly appointed by IIR and PJK.
Setelah penilaian yang dilakukan oleh konsultan Post assessment of the independent consultant,
independen, PJK dan Penjual menandatangani PJK and the Sellers signed a settlement agreement
perjanjian penyelesaian tertanggal 1 Juli 2024, dimana dated July 1, 2024, wherein the parties agreed on
para pihak setuju bahwa jumlah klaim jaminan yang the amounts of warranty claim, that needs to be
harus dibayar oleh Penjual kepada PJK sebesar Rp40,9 paid by the Sellers to PJK, amounted to Rp40.9
miliar dan US$7,0 juta. Klaim jaminan ini dibayarkan net billion and US$7.0 million. Payment of such
dengan lebih bayar pajak yang ditetapkan oleh kantor warranty claim was net off with tax overpayment
pajak atas kewajiban pajak MUTU untuk tahun pajak assessed by tax office for MUTU’s tax obligation for
2018 - 2021. Ketetapan pajak adalah sebesar Rp214,8 fiscal years 2018 - 2021. The tax assessments
juta untuk kurang bayar pajak penghasilan pasal 21 dan resulted in underpayment of withholding article 21
US$77,6 ribu untuk lebih bayar pajak badan. Klaim of Rp214.8 million and overpayment of corporate
jaminan ini telah dibayarkan oleh Penjual pada tanggal income tax totaling to US$77.6 thousand. The
11 Juli 2024. warranty claim was paid by the Sellers on July 11,
2024.
Biaya terkait transaksi adalah sebesar US$ 540.410 dan Cost related to the transaction amounted to
dibebankan langsung pada laba rugi saat terjadi. US$ 540,410 and was charged directly to profit and
loss when incurred.
Perhitungan keuntungan Transaksi (Catatan 45) adalah Calculation of gain on Transaction (Note 45) is as
sebagai berikut: follows:
Nilai/Amount
US$
Aset bersih Grup yang dilepas Net assets of disposal Group
pada tanggal 31 Desember 2023 210.987.236 as of December 31, 2023
Bagian laba bersih MUTU Equity in net income of MUTU
selama Januari - Februari 2024 1.527.849 during January - February 2024
Aset bersih Grup yang dilepas Net assets of disposal Group
pada tanggal pelepasan 212.515.085 as of disposal date
Harga pelepasan 218.000.000 Price consideration
Klaim jaminan - bersih (9.387.913) Warranty claim - net
Kerugian pelepasan (3.902.998) Loss on divestment
Perusahaan berkeyakinan bahwa Transaksi dilakukan The Company believes that the Transaction is
sesuai dengan strategi bisnis diversifikasi Perusahaan made in accordance with the Company’s
serta untuk memastikan agar Perusahaan fokus pada diversification strategy and to ensure that the
pelaksanaan kegiatan usaha yang berkelanjutan. Company focuses on the implementation of
sustainability of the business activities of the
Company.
Divestasi MEA Divestment of MEA
Pada bulan Maret 2024, IIR menandatangani Perjanjian In March 2024, IIR signed a conditional sales and
Pengikatan Jual Beli Bersyarat (PPJB) untuk seluruh purchase agreement (CSPA) for all of its entire
sahamnya sebesar 60% atau setara dengan 3.060 60% shares or amounting to 3,060 shares, in
saham, di PT Mitra Energi Agung (MEA). Nilai total untuk PT Mitra Energi Agung (MEA). The total
kepemilikan 100% di MEA adalah Rp 25.000.000.000. consideration for the 100% stake in MEA is Rp
Penyelesaian penjualan ini tergantung pada pemenuhan 25,000,000,000. The completion of the sale is
- 102 -
Page 107
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31,
2023 DAN UNTUK PERIODE SEMBILAN BULAN YANG 2023 AND FOR THE NINE-MONTH PERIODS ENDED
BERAKHIR PADA TANGGAL 30 SEPTEMBER 2024 DAN 2023 SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(TIDAK DIAUDIT) (Lanjutan) (Continued)
persyaratan dan kondisi, sebagaimana diatur lebih subject to fulfilment of certain terms and condition,
lanjut dalam PPJB. as further stipulated under the CSPA.
Sampai dengan 30 April 2024, IIR telah menerima uang As of April 30, 2024, IIR has received down
muka sebesar 90% dari nilai transaksi, yang dicatat payment of 90% from the transaction price, which
sebagai bagian dari uang muka diterima dari pihak was recorded as part of advance received from
ketiga. third parties.
Selanjutnya pada tanggal 3 Oktober 2024, IIR telah Further, on October 3, 2024, IIR concluded the
menyelesaikan PPJB dan menandatangani Akta Jual Beli CSPA and signed a Deed of Sale of Shares with PT
Saham dengan PT Niaga Gilang Persada mengenai Niaga Gilang Persada in relation to the sale of its
pengalihan seluruh saham miliknya di MEA shares of MEA (the “Transaction”).
(“Transaksi”).
Aset Tetap Property, plant and equipment
Pada tanggal 17 April 2023, IMU dan PT AGPA Refinery On April 17, 2023, IMU and PT AGPA Refinery
Complex (AGPA) menandatangani Perjanjian Complex (AGPA) entered into Conditional Sale and
Pengikatan Jual Beli Bersyarat (PPJB), dimana IMU Purchase Agreement (CSPA), wherein IMU intends
bermaksud untuk menjual tanahnya seluas 292.193 to sell its land measuring 292,193 square meters
meter persegi yang berlokasi di Kariangau Balikpapan, located in Kariangau Balikpapan, East Kalimantan,
Kalimantan Timur, beserta segala sesuatu yang tumbuh including all fixtures attached and affixed to the
dan tertanam diatasnya, dengan harga jual sebesar US$ land, at a selling price of US$ 26,534,045
26.534.045 (setara dengan Rp 397.771.874.920). PPJB (equivalent to Rp 397,771,874,920). The CSPA
mengatur pembayaran dalam 3 tahap, dimana masing- defines 3 stages of payments, wherein each stage
masing tahap akan diterima berdasarkan pemenuhan will be received, depending on the fulfilment of
persyaratan dan kondisi, sebagaimana diatur lebih certain terms and conditions as further detailed in
lanjut dalam PPJB. the CSPA.
Pada tanggal 12 Juli 2023 dan 2 Oktober 2023, IMU On July 12, 2023 and October 2, 2023, IMU
menerima pembayaran tahap pertama dan kedua received the first and second stage of payments
masing-masing sebesar Rp 132.485.682.841 (setara amounting to Rp 132,485,682,841 (equivalent to
dengan US$ 8.796.022) dan Rp 57.530.045.056 (setara US$ 8,796,022) and Rp 57,530,045,056
dengan US$ 3.705.400), belum termasuk pajak (equivalent to US$ 3,705,400), respectively,
pertambahan nilai. excluding value added tax.
Setelah penerimaan pembayaran tersebut, IMU Following receipts of such payments, IMU entered
menandatangani akta perjanjian jual dan beli dengan into deed sale and purchase agreement with AGP,
AGP, dimana IMU telah efektif menjual tanah dan wherein IMU effectively sold 133,041 m3 land
bangunan seluas 133.041 m3 pada tanggal along with the building on October 19, 2023. Gain
19 Oktober 2023. Keuntungan yang diakui atas recognized from the transaction was US$
transaksi ini adalah US$ 9.230.947 pada tahun 2023. 9,230,947 in 2023.
Pada tanggal 31 Desember 2023, sisa aset yang sudah As of December 31, 2023, the remaining asset
termasuk dalam komitmen penjualan disajikan sebagai committed for sale was presented as part of non-
bagian aset tidak lancar dimiliki untuk dijual dengan nilai current asset held for sale with carrying amount of
tercatat sebesar US$ 5.650.064. US$ 5,650,064.
Pada tanggal 20 September 2024 sesuai dengan Akta On September 20 2024 in accordance with the Sale
Jual Beli No. 1163/2024, 1164/2024, 1165/2024, and Purchase Deed No. 1163/2024, 1164/2024,
1166/2024 IMU melepas sisa tanah seluas 159.152 m3 1165/2024, 1166/2024 IMU issued the remaining
sebesar US$13.481.904 dan mengakui keuntungan atas land area of 159,152 m3 for US$13,481,904 and
pelepasan tanah tersebut senilai US$7.831.840 recognized gain on disposal of land of
(Catatan 45). US$7,831,840 (Note 45).
- 103 -
Page 108
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31,
2023 DAN UNTUK PERIODE SEMBILAN BULAN YANG 2023 AND FOR THE NINE-MONTH PERIODS ENDED
BERAKHIR PADA TANGGAL 30 SEPTEMBER 2024 DAN 2023 SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(TIDAK DIAUDIT) (Lanjutan) (Continued)
15. INVESTASI PADA ENTITAS ASOSIASI DAN 15. INVESTMENT IN ASSOCIATES AND JOINT
VENTURA BERSAMA VENTURES
Persentase kepemilikan dan
hak suara yang dimiliki
Perusahaan dan entitas anak/
Percentage of ownership
interest and voting power
Nama entitas asosiasi/ Aktivitas utama/ Tempat kedudukan/ held by the Company Jumlah tercatat/
Name of associates Principal activity Domicile and its subsidiaries Carrying amount
30 September/ 31 Desember/ 30 September/ 31 Desember/
September 30, December 31, September 30, December 31,
2024 2023 2024 2023
% % US$ US$
PT Cirebon Energi Prasarana (CEPR) Pembangkit Listrik Tenaga Uap/Coal-fired power plant Cirebon - Jawa Barat/ 6,25% 6,25% 151.590.459 148.513.424
Cirebon - West Java
PT Cirebon Electric Power (CEP) Pembangkit Listrik Tenaga Uap/Coal-fired power plant Cirebon - Jawa Barat/ 20% 20% 77.437.433 75.727.509
Cirebon - West Java
PT Sea Bridge Shipping (SBS) Pengangkutan barang domestik/Domestic goods shipment Jakarta/Jakarta 46% 46% 17.820.550 19.816.690
Perdagangan besar dan eceran, informasi dan komunikasi serta
PT Mitra Samudra Indonesia (MSI) Aktivitas profesional, ilmiah dan teknis/ Jakarta/ 30,1% 30,1% 1.767.281 1.814.028
Wholesale and retail trading, information and communication as well as Jakarta
professional, scientific and technical activities
PT Narada Sahara Kencana (ADX) Layanan digital dan periklanan Jakarta/ Jakarta 22.5% 22.5% 1.068.639 1.119.517
Digital services and advertising
PT Cirebon Power Services (CPS) Pengoperasian dan pemeliharaan fasilitas dan alat-alat listrik/ Cirebon - Jawa Barat/ 20% 20% 280.576 327.718
Operation and maintenance of facilities and power tools Cirebon - West Java
PT Natura Aromatik Nusantara (NAN) Industri minyak atsiri/ Essential oil industry Solo - Jawa Tengah/ - 46,0% - 11.738.247
Solo - West Java
PT Pelabuhan Patimban Internasional Pengangkutan dan pergudangan/ Jakarta/Jakarta 29% 29% - -
Transportation and warehousing
PT Intan Resources Indonesia (IRI) Perdagangan batubara dan konsultasi pertambangan/ Jakarta/ Jakarta - 43,3% - -
Coal trading and mining consulting
Jumlah/Total 249.964.938 259.057.133
Investasi pada ventura bersama/ Investment in joint ventures:
PT Empat Mitra Indika Tenaga Surya (EMITS) Pembangkit Listrik Tenaga Surya/ Solar Panel Power Plant Jakarta/ Jakarta 51% 51% 6.069.062 5.524.125
Jumlah /T otal 256.034.000 264.581.258
Mutasi investasi pada entitas asosiasi adalah sebagai Changes in investments in associates are as follows:
berikut:
30 September/ 31 Desember/
September 30, December 31,
2024 2023
US$ US$
Nilai tercatat awal periode 259.057.133 241.629.064 Carrying amount at beginning of period
Penambahan - 11.689.347 Additions
Perubahan investasi tambahan Changes of investment due to additional
kepemilikan di CTA (Catatan 1) - (4.131.578) ownership in CTA (Note 1)
Perubahan investasi tambahan Changes of investment due to additional
kepemilikan di NAN (Catatan 1) (11.794.457) - ownership in NAN (Note 1)
Bagian laba entitas asosiasi 15.176.791 22.876.701 Equity in net profit of associates
Dividen (5.657.500) (11.520.000) Dividends
Bagian penghasilan komprehensif lain Share in other comprehensive income
pada entitas asosiasi: of associates:
Kerugian yang belum direalisasi Unrealized loss on derivative
atas instrumen keuangan financial instrument (hedging
derivatif (cadangan lindung nilai) (6.781.265) (1.706.007) reserve)
Selisih kurs (35.764) 219.606 Translation adjustment
Nilai tercatat akhir periode 249.964.938 259.057.133 Carrying amount at end of period
Ringkasan informasi keuangan dari entitas asosiasi Summarized financial information in respect of the
Grup ditetapkan di bawah ini. Ringkasan informasi Group’s material associates is set out below. The
keuangan ini mencerminkan jumlah yang terdapat summarized financial information below represent
dalam laporan keuangan entitas asosiasi yang disusun amounts shown in the associate’s financial statements
sesuai dengan Standar Akuntansi Keuangan prepared in accordance with Indonesian Financial
Indonesia. Accounting Standards.
- 104 -
Page 109
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31,
2023 DAN UNTUK PERIODE SEMBILAN BULAN YANG 2023 AND FOR THE NINE-MONTH PERIODS ENDED
BERAKHIR PADA TANGGAL 30 SEPTEMBER 2024 DAN 2023 SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(TIDAK DIAUDIT) (Lanjutan) (Continued)
30 September/September 30, 2024 31 Desember/December 31, 2023
CEPR CEP SBS CEPR CEP SBS NAN
US$ US$ US$ US$ US$
Aset lancar 367.564.573 116.385.074 20.446.498 265.113.892 120.524.282 19.848.689 11.201.359 Current assets
Aset tidak lancar 2.269.153.339 388.712.389 26.351.079 2.350.473.602 395.502.710 27.401.431 6.405.981 Non-current assets
Liabilitas lancar 115.523.348 33.813.805 7.053.582 90.235.730 32.550.045 3.214.866 1.187.607 Current liabilities
Liabilitas tidak lancar 1.914.832.728 84.096.495 1.003.668 1.931.298.070 104.839.402 955.485 1.664.176 Non-current liabilities
2024 2023
CEPR CEP SBS CEPR CEP SBS NAN
US$ US$ US$ US$ US$ US$ US$
Pendapatan 300.730.907 149.354.535 21.637.171 239.814.036 148.834.331 23.007.713 14.854.914 Revenue
Laba sebelum pajak 49.278.993 11.448.536 9.675.257 57.287.484 22.639.027 11.980.239 271.936 Profit before tax
Laba periode berjalan 38.191.220 8.806.833 7.681.361 44.397.800 17.545.245 11.548.008 271.936 Profit for the period
Jumlah penghasilan Total comprehensive
komprehensif selama income for the
periode berjalan 11.066.160 8.806.833 7.681.361 82.539.604 17.545.245 11.548.008 271.936 period
Dividen yang diumumkan Dividends declared
selama periode berjalan - - 12.000.000 - 30.000.000 12.000.000 - during the period
Rekonsiliasi ringkasan informasi keuangan di atas Reconciliation of the above summarized financial
terhadap nilai tercatat investasi pada CEP, SBS, CEPR, information to the carrying amount of the interest in
dan NAN diukur menggunakan metode ekuitas yang CEP, SBS, CEPR and NAN measured using the equity
diakui dalam laporan posisi keuangan konsolidasian: method recognized in the consolidated financial
statements:
30 September/September 30, 2024 31 Desember/December 31, 2023
CEPR CEP SBS CEPR CEP SBS NAN
US$ US$ US$ US$ US$
Aset bersih entitas asosiasi 606.361.836 387.187.163 38.740.327 594.053.694 378.637.545 43.079.769 14.755.557 Net assets of the associate
Persentase bagian kepemilikan Percentage of the Group
Grup 25% 20% 46% 25% 20% 46% 46% owmership interest
Kelebihan biaya perolehan investasi terhadap Excess of the cost of acquisition
bagian IMP atas nilai wajar bersih over IMP's share of the net fair
dari aset dan liabilitas teridentifikasi value of identifiable assets
NAN pada tanggal perolehan - - - - - - 4.950.691 and liabilities of NAN at acquisition date
Ekuitas yang diatribusikan ke Grup Equity attributable to the Group
yang merepresentasikan nilai representing carrying amount
tercatat bagian Grup 151.590.459 77.437.433 17.820.550 148.513.424 75.727.509 19.816.690 11.738.247 of the Group's interest
Jumlah gabungan informasi entitas asosiasi yang Aggregate information of associates that are not
secara individual tidak material: individually material:
2024 2023
US$ US$
Bagian Grup dari rugi bersih
entitas asosiasi 334.193 (832.690) Group's share in loss of associates
Bagian Grup dari penghasilan komprehensif Group's share in other comprehensive
lain entitas asosiasi (35.764) 400.141 income of associates
Bagian Grup dari jumlah penghasilan Group's share in total comprehensive
komprehensif entitas asosiasi 298.429 (432.549) income of associates
30 September/ 31 Desember/
September 30, December 31,
2024 2023
US$ US$
Nilai tercatat gabungan atas kepentingan Aggregate carrying amount of Group's
Grup dalam entitas asosiasi ini 3.116.496 3.261.263 interest in these associates
Ringkasan informasi keuangan dari entitas asosiasi Summarized financial information in respect of the
Grup yang secara individual tidak material ditetapkan Group associates that are not individually material is
di bawah ini. set out below.
- 105 -
Page 110
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31,
2023 DAN UNTUK PERIODE SEMBILAN BULAN YANG 2023 AND FOR THE NINE-MONTH PERIODS ENDED
BERAKHIR PADA TANGGAL 30 SEPTEMBER 2024 DAN 2023 SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(TIDAK DIAUDIT) (Lanjutan) (Continued)
30 September/ 31 Desember/
September 30, December 31,
2024 2023
US$ US$
Aset lancar 7.927.080 6.499.059 Current assets
Aset tidak lancar 129.570.232 131.259.396 Non-current assets
Liabilitas lancar 4.175.283 3.176.285 Current liabilities
Liabilitas tidak lancar 168.667.568 154.243.988 Non-current liabilities
2024 2023
US$ US$
Pendapatan 12.341.631 10.534.260 Revenue
Rugi sebelum pajak (9.515.377) (12.978.693) Loss before tax
Rugi periode berjalan (9.634.658) (13.151.086) Loss for the period
Jumlah kerugian komprehensif selama Total comprehensive loss
periode berjalan (9.853.525) (13.144.594) for the period
Dividen yang diumumkan asosiasi yang Dividends declared by associates
secara individual tidak signifikan that are not individually material
selama periode berjalan 687.500 - during the period
PT Cirebon Energi Prasarana PT Cirebon Energi Prasarana
CEPR didirikan untuk rencana pengembangan proyek CEPR was established in line with the Coal-fired Power
Pembangkit Listrik Tenaga Uap (PLTU) Cirebon Plant development project at the capacity of
berkapasitas 1 x 1000 MW yang berlokasi di Cirebon, 1 x 1000 MW located at Cirebon, West Java
Jawa Barat (“Proyek”) dan mulai beroperasi secara (“Project”) and started commercial operation since
komersial pada tanggal 19 Mei 2023. May 19, 2023.
Pada tanggal 21 Oktober 2015, dengan masuknya On October 21, 2015, following the participation of
para sponsor lainnya ke dalam CEPR, yaitu Marubeni other sponsors in CEPR, namely Marubeni
Corporation, Samtan Co. Ltd., Korea Midland Power Corporation, Samtan Co. Ltd., Korea Midland Power
Co. Ltd. dan Chubu Electric Power Co. Ltd., maka Co. Ltd. and Chubu Electric Power Co. Ltd., PEC’s
kepemilikan PEC di CEPR telah terdilusi menjadi 25%. ownership in CEPR has been diluted to 25%.
Pada tanggal 1 Agustus 2016, kepemilikan Grup di On August 1, 2016, the Group effective interest in
CEPR terdilusi dari 25% menjadi 6,25%. CEPR was further diluted from 25% to 6.25%.
PEC memberikan ekuitas tambahan kepada CEPR PEC injected additional equity to CEPR at the amount
sebesar US$ 48.770.000 pada tanggal 11 Januari of US$ 48,770,000 on January 11, 2022. For the
2022. Dana untuk tambahan ekuitas ini diperoleh PEC purpose of funding such equity contribution, PEC
dari kontribusi modal PEI dan IMECO, proporsional obtained additional capital contribution from PEI and
dengan kepemilikan saham PEI dan IMECO masing- IMECO, proportionate with PEI and IMECO’s
masing di PEC. ownership in PEC.
Kontribusi yang diberikan oleh PEC dilakukan Contribution provided by PEC was made
proporsional dengan jumlah kepemilikannya di CEPR, proportionate to its ownership in CEPR, hence its
sehingga kepemilikannya di CEPR tetap sebesar 6,25%. ownership in CEPR remains at 6.25%.
Kepemilikan tidak langsung Perusahaan pada CEPR The Company’s indirect ownership in CEPR through
melalui PEC dijadikan sebagai jaminan terkait dengan PEC was used as collateral to a related party’s loan
fasilitas pinjaman pihak berelasi (Catatan 54). facility (Note 54).
PT Cirebon Electric Power PT Cirebon Electric Power
Kepemilikan tidak langsung Perusahaan pada The Company’s indirect ownership in CEP through IPI
CEP melalui IPI dan III dijadikan sebagai jaminan and III was used as collateral to a related party’s loan
terkait dengan fasilitas pinjaman pihak berelasi facility (Note 54).
(Catatan 54).
- 106 -
Page 111
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31,
2023 DAN UNTUK PERIODE SEMBILAN BULAN YANG 2023 AND FOR THE NINE-MONTH PERIODS ENDED
BERAKHIR PADA TANGGAL 30 SEPTEMBER 2024 DAN 2023 SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(TIDAK DIAUDIT) (Lanjutan) (Continued)
Berdasarkan rapat Direksi CEP tanggal 25 September Based on Directors meeting of CEP on September 25,
2023, CEP memutuskan dan mengumumkan 2023, CEP resolved and declared interim dividend at
pembagian dividen interim sebesar US$ 2.000.000. the amount of US$ 2,000,000. III and IPI’s portion of
Bagian III dan IPI atas dividen tersebut masing- such dividend are US$ 100,000 and US$ 300,000,
masing sebesar US$ 100.000 dan US$ 300.000. respectively. Such dividend has been received in
Dividen telah diterima pada bulan September 2023. September 2023.
Berdasarkan rapat Direksi CEP tanggal 8 Maret 2023, Based on Directors meeting of CEP on March 8, 2023,
CEP memutuskan dan mengumumkan pembagian CEP resolved and declared dividend at the amount of
dividen sebesar US$ 28.000.000. Bagian III dan IPI US$ 28,000,000. III and IPI’s portion of such dividend
atas dividen tersebut masing-masing sebesar are US$ 1,400,000 and US$ 4,200,000, respectively.
US$ 1.400.000 dan US$ 4.200.000.
PT Sea Bridge Shipping PT Sea Bridge Shipping
Pada bulan Oktober 2008, TPEC mendirikan SBS, In October 2008, TPEC established SBS, a company
perusahaan yang bergerak dalam bidang engaged in domestic goods shipment. TPEC has 46%
pengangkutan barang domestik. TPEC mempunyai ownership interest. SBS is domiciled in East
kepemilikan sebesar 46%. SBS berdomisili di Kalimantan and started its commercial operations in
Kalimantan Timur dan memulai operasi komersial 2008.
pada tahun 2008.
Berdasarkan keputusan edaran rapat pemegang Based on circular resolution of annual general
saham tahunan SBS tertanggal 19 Juni 2024, meeting of shareholders of SBS dated June 19, 2024,
disetujui bahwa SBS akan membagikan dividen it is approved that SBS will distribute dividend at the
sebesar US$12.000.000 paling lambat tanggal 31 amount of US$12,000,000, which will be paid at the
Desember 2024. Bagian TPEC atas dividen ini sebesar latest December 31, 2024. TPEC’s portion of such
US$5.520.000 dan telah diterima sebagian pada dividend was US$5,520,000 and has been partially
bulan September 2024 sebesar US$2.760.000. received in September 2024 at the amount of
Jumlah yang belum diterima disajikan sebagai US$2,760,000. The remaining unreceived balance
piutang dividen pada tanggal 30 September 2024. was presented as part of dividend receivable as of
September 30, 2024.
Berdasarkan Rapat Umum Pemegang Saham Based on Annual General Meeting of Shareholders of
Tahunan SBS tertanggal 13 April 2023, pemegang SBS on April 13, 2023, the shareholders approved
saham menyetujui antara lain pembagian dividen among other things payment of dividend at the
sebesar US$ 12.000.000 atas kinerja tahun 2022, amount of US$ 12,000,000 from its year 2022 results,
dengan jadwal pembayaran sebagai berikut: with the following payment schedules:
• US$ 5.000.000 pada bulan April 2023 • US$ 5,000,000 in April 2023
• US$ 7.000.000 pada bulan Oktober 2023 • US$ 7,000,000 in October 2023
Bagian TPEC atas dividen ini sebesar US$ 5.520.000. TPEC’s portion of such dividend was US$ 5,520,000.
PT Mitra Samudra Indonesia (”MSI”) PT Mitra Samudra Indonesia (”MSI”)
Berdasarkan akta Perjanjian Pengambil Bagian Based on the Deed of Share Subscription Agreement
Saham No. 22 tanggal 16 Desember 2021 dari Ungke No. 22 dated December 16, 2021 from Ungke
Mulawanti, S.H., M.Kn., IMU telah mengambil Mulawanti, S.H., M.Kn., IMU has acquired 55 shares
kepemilikan 55 lembar saham milik PT Mitra Samudra owned by PT Mitra Samudra Indonesia (representing
Indonesia (mewakili 30,1%) dengan nilai 30.1%) amounting to Rp 33,500,000,000 (equivalent
Rp 33.500.000.000 (setara dengan US$ 2.334.332). to US$ 2,334,332).
PT Narada Sahara Kencana (”ADX”) PT Narada Sahara Kencana (”ADX”)
Pada tanggal 1 Maret 2022, Indika Ventures Pte. Ltd. On March 1, 2022, Indika Ventures Pte. Ltd. (“IDV”),
(“IDV”), selaku salah satu entitas anak Perusahaan, a subsidiary of the Company, has made investment
telah melaksanakan penyertaan dalam PT Narada in PT Narada Sahara Kencana (“ADX”), a limited
Sahara Kencana (“ADX”), suatu perseroan terbatas company involved in digital and advertisement
yang bergerak di bidang layanan digital dan services, through the following mechanisms:
periklanan, melalui beberapa mekanisme transaksi
sebagai berikut:
i. Konversi atas surat utang milik IDV berdasarkan i. Conversion of convertible loan owned by IDV
Perjanjian Penyertaan Surat Utang Wajib Konversi based on Mandatory Convertible Loan Agreement
tertanggal 24 April 2020 sebesar Rp 8.000.000.000 dated April 24, 2020 of Rp 8,000,000,000
(setara dengan US$ 560.656) menjadi 12,5% (equivalent to US$ 560,656) for 12.5% share
saham di ADX, dan ownership in ADX, and
- 107 -
Page 112
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31,
2023 DAN UNTUK PERIODE SEMBILAN BULAN YANG 2023 AND FOR THE NINE-MONTH PERIODS ENDED
BERAKHIR PADA TANGGAL 30 SEPTEMBER 2024 DAN 2023 SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(TIDAK DIAUDIT) (Lanjutan) (Continued)
ii. Penyertaan atas saham baru yang diterbitkan oleh ii. Investment in new shares issued by ADX of
ADX sebesar Rp 7.500.000.000 (setara dengan Rp 7,500,000,000 (equivalent to US$ 523,922) or
US$ 523.922) yang setara dengan 10% saham di equivalent to 10% share ownership in ADX.
ADX.
Setelah penyelesaian kedua transaksi diatas, IDV After the above mentioned two transactions, IDV
memiliki 22,5% saham di ADX. owns 22.5% share ownership in ADX.
PT Cirebon Power Services PT Cirebon Power Services
Kepemilikan tidak langsung Perusahaan pada CPS The Company’s indirect ownership in CPS was used as
dijadikan sebagai jaminan terkait dengan fasilitas collateral to a related party’s loan facility.
pinjaman pihak berelasi.
Berdasarkan keputusan edaran rapat pemegang Based on circular resolution of annual general
saham tahunan CPS tertanggal 4 Juni 2024, disetujui meeting of shareholders of CPS dated June 4, 2024,
bahwa CPS akan membagikan dividen sebesar it is approved that CPS will distribute dividend at the
Rp 11.000.000.000 (setara dengan US$ 687.500), amount of Rp11,000,000,000 (equivalent to
dimana bagian III dan IPI atas dividen tersebut US$ 687,500), wherein III’s and IPI’s portion on such
masing-masing sebesar US$ 34.375 (setara dengan dividend was US$ 34,375 (equivalent to
Rp 550.000.000) dan US$ 103.125 (setara dengan Rp 550,000,000) and US$ 103,125 (equivalent to
Rp 1.650.000.000). Rp 1.650.000.000), respectively.
PT Natura Aromatik Nusantara PT Natura Aromatik Nusantara
Pada tanggal 19 Januari 2023, PT Indika Multi Properti On January 19, 2023, PT Indika Multi Properti ("IMP"),
(“IMP”), sebagai salah satu entitas anak Perusahaan, as one of the Company's subsidiary, has participated
telah melaksanakan penyertaan saham dalam into PT Natura Aromatik Nusantara ("NAN"), a limited
PT Natura Aromatik Nusantara (“NAN”), suatu liability company engaged in the essential oil industry
perseroan terbatas yang bergerak di bidang industri ("Share Participation"). The Share Participation
minyak atsiri (“Penyertaan Saham”). Penyertaan by IMP is conducted by way of subscription of new
Saham dilakukan oleh IMP dalam bentuk pengambilan shares issued by NAN and shares purchase from the
saham-saham baru yang diterbitkan oleh NAN dan existing shareholders, with a total transaction value
pembelian saham dari pemegang saham saat ini, of Rp 179,618,500,580 or equivalent to
dengan jumlah keseluruhan nilai transaksi sebesar US$ 11,689,347. Upon effectiveness of the Share
Rp 179.618.500.580 atau setara dengan Participation, IMP owns 46% shares in NAN.
US$ 11.689.347. Setelah Penyertaan Saham berlaku
efektif, maka IMP akan memiliki 46% saham di NAN.
Penyertaan Saham ini telah dinyatakan dalam Akta This Share Participation is stated in Notarial Deed
Notarial No. 30 tertanggal 19 Januari 2023, yang No. 30 dated January 19, 2023, made before Ungke
dibuat di hadapan Ungke Mulawanti, S.H., M.Kn., Mulawanti, S.H., M.Kn., Notary in Bekasi. Such deed
Notaris di Bekasi. Akta tersebut telah mendapatkan has also obtained approval from the Ministry of Law and
persetujuan dari Kementerian Hukum dan Hak Asasi Human Rights of the Republic of Indonesia (“MOLHR”)
Manusia Republik Indonesia (“Menkumham”) melalui through Decree No. AHU-0004013.AH.01.02.Tahun
Surat Keputusan No. AHU-0004013.AH.01.02.Tahun 2023 dated January 20, 2023 and its notification
2023 tertanggal 20 Januari 2023 dan pemberitahuan has been received by MOLHR based on Decree
kepada Menkumham telah diterima berdasarkan No. AHU-AH.01.03-0010795 and No. AHU-AH.01.09-
Surat Keputusan Menkumham No. AHU-AH.01.03- 0027597 dated January 20, 2023.
0010795 dan No. AHU-AH.01.09-0027597 tertanggal
20 Januari 2023.
Penyertaan Saham ini merupakan langkah strategis This Share Participation is made as a strategic step of
Grup untuk melakukan ekspansi usaha ke industri the Group to expand its business activities to essential
minyak atsiri di Indonesia. oil industry, in Indonesia.
Pada tanggal Penyertaan Saham, nilai wajar aset As of Share Participation date, fair value of NAN’s
bersih teridentifikasi NAN terdiri dari: identifiable net assets consisted of:
- 108 -
Page 113
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31,
2023 DAN UNTUK PERIODE SEMBILAN BULAN YANG 2023 AND FOR THE NINE-MONTH PERIODS ENDED
BERAKHIR PADA TANGGAL 30 SEPTEMBER 2024 DAN 2023 SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(TIDAK DIAUDIT) (Lanjutan) (Continued)
Nilai wajar aset bersih
yang di akuisisi/
Fair value of the net
assets acquired
Jumlah / Total
US$
Nilai wajar bersih aset yang diakuisisi: Fair value of the net assets acquired:
Kas dan bank 25.588 Cash and bank
Piutang usaha ke pihak ketiga 2.193.826 Trade receivable third parties
Persediaan 4.771.085 Inventories
Aset lancar lainnya 971.785 Other current assets
Aset tetap 7.214.966 Fixed Assets
Aset tidak berwujud teridentifikasi 4.523.750 Intangible assets
Aset tidak lancar lainnya 1.809.132 Other non-current assets
Utang bank (2.618.782) Bank loan
Utang usaha (2.262.099) Trade payable
Liabilitas lainnya (569.776) Other liabilities
Liabilitas pajak tangguhan (1.410.222) Deferred tax liabilities
Jumlah aset bersih 14.649.253 Total net assets
Persentase bagian kepemilikan Percentage of the Company
Perusahaan 46% ownership interest
Kepemilikan Perusahaan pada NAN 6.738.656 The Company's ownership interest in NAN
Goodwill 4.950.691 Goodwill
Nilai tercatat investasi Perusahaan Carrying amount of the Company's
pada NAN 11.689.347 interest in NAN
Nilai wajar aset bersih teridentifikasi NAN ditentukan The fair value of NAN’s identifiable net assets was
oleh Kantor Jasa Penilai Publik (KJPP) Suwendho determined by Kantor Jasa Penilai Publik (KJPP)
Rinaldy & Rekan, penilai independent. Suwendho Rinaldy & Rekan, an independent
appraiser.
Pada tanggal 27 Maret 2024, IMP dan Laras telah On March 27, 2024, IMP and Laras have conducted
melaksanakan pengambilalihan saham tambahan di additional shares acquisition in NAN from the original
NAN dari para pemegang saham awal, Novotel shareholders, Novotel International Care Extracts
International Care Extracts Limited, PT Esensi Natura Limited, PT Esensi Natura Nusantara, Modiwati
Nusantara, Modiwati Karunia Mulia, Yohannes Karunia Mulia, Yohannes Setyawan, and Mafruhin
Setyawan, dan Mafruhin Joko Nugroho Joko Nugroho (“Additional Shares Acquisition”).
(“Pengambilalihan Saham Tambahan”).
Setelah Pengambilalihan Saham Tambahan berlaku Upon effectiveness of the Additional Shares
efektif, maka IMP akan memiliki 99,353% saham di Acquisition, IMP owns 99.353% shares in NAN and
NAN dan Laras akan memiliki 0,647% saham di NAN, Laras owns 0.647% shares in NAN, hence financial
sehingga laporan keuangan NAN terkonsolidasi pada statements of NAN is consolidated to the Company
Perusahaan sejak saat itu (Catatan 1). since then (Note 1).
PT Pelabuhan Patimban Internasional (PPI) PT Pelabuhan Patimban Internasional (PPI)
Pada tanggal 30 September 2024 dan 31 Desember As of September 30, 2024 and December 31, 2023,
2023, bagian IPA atas kerugian komprehensif lain PPI IPA’s share of losses in PPI’s comprehensive income
melebihi kepentingannya di PPI, sehingga exceeded its interest in PPI, therefore discontinue
menghentikan pengakuan bagiannya atas kerugian recognizing its share of further losses. In accordance
selanjutnya. Sebagai akibatnya, Perusahaan dan therewith, the Company and its subsidiaries did not
entitas anak tidak mengakui bagian IPA atas rugi recognize IPA’s share in net comprehensive loss of
komprehensif PPI sebesar US$ 9.787.241 (2023: PPI amounting to US$ 9,787,241 (2023:
US$ 4.825.293). US$ 4,825,293).
PT Intan Resources Indonesia PT Intan Resources Indonesia
IIC memiliki 866 saham, yang merupakan 43,3% IIC owns 866 shares, which represents 43.3% of
kepemilikan pada IRI, suatu perusahaan yang ownership interest in IRI, a company engaged in coal
bergerak dalam bidang perdagangan batubara dan trading and mining consultancy. IRI is domiciled in
konsultasi pertambangan. IRI berdomisili di Jakarta. Jakarta.
- 109 -
Page 114
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31,
2023 DAN UNTUK PERIODE SEMBILAN BULAN YANG 2023 AND FOR THE NINE-MONTH PERIODS ENDED
BERAKHIR PADA TANGGAL 30 SEPTEMBER 2024 DAN 2023 SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(TIDAK DIAUDIT) (Lanjutan) (Continued)
Nilai tercatat investasi pada IRI adalah nihil pada 31 The carrying amount of investment in IRI is nil as of
Desember 2023. December 31, 2023.
IRI telah dilikuidasi pada tanggal 23 Juli 2024 IRI was liquidated on July 23, 2024, based on Deed
berdasarkan Akta No. 74 tanggal 21 Juni 2024 dari No 74 dated June 21, 2024, of Ungke Mulawanti, S.H.
Ungke Mulawanti, S.H. M.Kn., notaris di Bekasi dan M.Kn., a notary in Bekasi and approved by Minister of
disetujui oleh Menteri Hukum dan Hak Asasi Manusia Law and Human Rights of Republic of Indonesia based
Republik Indonesia berdasarkan surat No. AHU- on its letter No. AHU-AH.01.03-00476 dated July 23,
AH.01.03-00476 tanggal 23 Juli 2024. 2024.
IIC sebagai pemegang saham atas 43,3% IIC, as the 43.3% shareholder of IRI, received final
kepemilikan di IRI menerima distribusi kas akhir cash distribution of US$48,147 from such liquidation.
sebesar US$48.147 terkait dengan likuidasi ini.
Investasi pada ventura bersama Investment in joint venture
PT Empat Mitra Indika Tenaga Surya PT Empat Mitra Indika Tenaga Surya
Pada bulan Maret 2021, ITB bersama dengan Fourth In March 2021, ITB together with Fourth Partner
Partner Energy Singapore Pte. Ltd. (“FPES”) Energy Singapore Pte. Ltd. (“FPES”) established
mendirikan perusahaan dengan nama PT Empat Mitra PT Empat Mitra Indika Tenaga Surya (“EMITS”).
Indika Tenaga Surya (“EMITS”).
Modal dasar dan ditempatkan EMITS masing-masing Authorized and subscribed capital of EMITS is
sebesar Rp 111.912.000.000 (setara dengan Rp 111,912,000,000 (equivalent to US$ 7,822,182)
US$ 7.822.182) dan Rp 27.978.000.000 (setara and Rp 27,978,000,000 (equivalent to
dengan US$ 1.955.546), dimana dari modal US$ 1,955,546), respectively, wherein from the total
ditempatkan tersebut, saham ITB sebesar subscribed capital, ITB’s portion of shares is
Rp 14.269.000.000 (atau setara dengan 51,001%), Rp 14,269,000,000 or equivalent to 51.001%), while
sedangkan sisanya dimiliki oleh FPES. the remaining belongs to FPES.
Maksud, tujuan dan kegiatan usaha EMITS adalah: EMITS is involved in the following business industry:
(1) menyediakan jasa konsultasi terkait instalasi (1) providing consultation services related to solar
proyek tenaga surya; (2) menyediakan konstruksi power installation project; (2) providing building
bangunan proyek tenaga surya; (3) operasi dan construction for solar power project; (3) operation
pemeliharaan instalasi listrik; (4) penyewaan and maintenance of electricity installation; (4) lease
pembangkit listrik atau instalasi listrik tenaga surya; of solar power plant or electricity installation; and
dan (5) kegiatan IPP pembangkit listrik tenaga surya. (5) activities related to IPP solar power plant.
Sebelum Oktober 2023, berdasarkan kesepakatan Prior to October 2023, based on the agreement
antara pemegang saham EMITS, ITB selaku between the shareholders of EMITS, ITB as a majority
pemegang saham mayoritas EMITS memiliki hak shareholders of EMITS shall have the right to
untuk mengarahkan keputusan operasional yang directing the operational decisions that will be made
akan diambil oleh EMITS. Saat ini EMITS bermaksud by EMITS. Currently, EMITS intends to develop its
untuk mengembangkan Proyek-proyek Pembangkit Utility Solar Power Project. Considering that the
Listrik Tenaga Surya Utilitas. Mengingat bahwa Utility Solar Power Project requires commitment of
Proyek-proyek Pembangkit Listrik Tenaga Surya the Shareholders to undertake each of their
Utilitas memerlukan komitmen keikutsertaan dari participation, the participation of EMITS into Utility
Para Pemegang Saham, keikutsertaan EMITS pada Solar Power Project requires joint decision of the
Proyek-proyek Pembangkit Listrik Tenaga Surya Shareholders to ensure their participation into the
memerlukan suatu keputusan yang harus disepakati relevant project(s) and such joint decision agreement
bersama oleh Para Pemegang Saham untuk takes effect since October 1, 2023.
memastikan komitmen EMITS pada proyek-proyek
terkait dan kesepakatan keputusan bersama ini
efektif sejak tanggal 1 Oktober 2023.
Terhitung sejak Oktober 2023, EMITS merupakan Effective from October 2023, EMITS became the
entitas asosiasi Perusahaan sehingga bagian associate of the Company, hence the Company’s
Perusahaan atas aset bersih EMITS sejak saat itu portion of EMITS’ net assets since then was presented
disajikan sebagai bagian dari catatan ini, sedangkan in this note, while equity in net profit of associates
akun bagian laba entitas asosiasi dari EMITS hanya from EMITS was only accounted from the periods
diperhitungkan untuk periode sejak tanggal 1 Oktober after October 1, 2023.
2023.
Mutasi investasi pada ventura bersama adalah Changes in investments in joint ventures are as
sebagai berikut: follows:
- 110 -
Page 115
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31,
2023 DAN UNTUK PERIODE SEMBILAN BULAN YANG 2023 AND FOR THE NINE-MONTH PERIODS ENDED
BERAKHIR PADA TANGGAL 30 SEPTEMBER 2024 DAN 2023 SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(TIDAK DIAUDIT) (Lanjutan) (Continued)
30 September/
September 30,
2024
US$
Nilai tercatat awal periode 5.524.125 Carrying amount at beginning of period
Penambahan 1.274.554 Additions
Bagian rugi entitas asosiasi (731.233) Equity in net loss of associates
Bagian penghasilan komprehensif lain Share in other comprehensive income
pada entitas asosiasi: of associates:
Selisih kurs 1.616 Translation adjustment
Nilai tercatat akhir periode 6.069.062 Carrying amount at end of period
Ringkasan informasi keuangan di bawah ini The summarized financial information below
merupakan jumlah yang disajikan dalam laporan represents amounts shown in the joint venture’s
keuangan ventura bersama sesuai dengan PSAK: financial statements in accordance with PSAK:
30 September/ 31 Desember/
September 30, December 31,
2024 2023
US$ US$
Aset lancar 11.970.301 14.784.494 Current assets
Aset tidak lancar 13.840.132 10.356.663 Non-current assets
Liabilitas lancar 4.950.291 2.997.401 Current liabilities
Liabilitas tidak lancar 8.960.021 11.312.138 Non-current liabilities
30 September/
September 30,
2024
US$
Pendapatan 550.705 Revenue
Rugi sebelum pajak (1.535.185) Loss before tax
Rugi periode berjalan (1.433.790) Loss for the period
Jumlah kerugian komprehensif selama Total comprehensive loss
periode berjalan (1.430.621) for the period
Rekonsiliasi ringkasan informasi keuangan di atas Reconciliation of the above summarized financial
terhadap nilai tercatat kepemilikan dalam ventura information to the carrying amount of the interest in
bersama yang diakui dalam laporan keuangan the joint venture recognized in the consolidated
konsolidasian: financial statements:
30 September/ 31 Desember/
September 30, December 31,
2024 2023
US$ US$
Aset bersih dari ventura bersama 11.900.121 10.831.618 Net assets of the joint venture
Proporsi kepemilikan Grup pada Proportion of the Group's ownership
ventura bersama 51% 51% interest in the joint venture
Jumlah tercatat kepemilikan Grup Carrying amount of the Group's interest
pada ventura bersama 6.069.062 5.524.125 in the joint venture
- 111 -
Page 116
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31,
2023 DAN UNTUK PERIODE SEMBILAN BULAN YANG 2023 AND FOR THE NINE-MONTH PERIODS ENDED
BERAKHIR PADA TANGGAL 30 SEPTEMBER 2024 DAN 2023 SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(TIDAK DIAUDIT) (Lanjutan) (Continued)
16. KLAIM PENGEMBALIAN PAJAK 16. CLAIMS FOR TAX REFUND
30 September/ 31 Desember/
September 30, December 31,
2024 2023
US$ US$
Perusahaan (Catatan 47) 8.741.565 - Perusahaan (Note 47)
Entitas anak Subsidiaries
TPEC 12.966.733 21.958.149 TPEC
TPE 926.195 1.568.439 TPE
Jumlah 22.634.493 23.526.588 Total
TPEC dan TPE TPEC and TPE
TPEC dan TPE mencatat klaim pengembalian pajak TPEC and TPE recorded CSTS JO’s claims for tax
CSTS JO sebesar masing-masing 28% dan 2% dari refund at 28% and 2%, respectively, of total claims
nilai klaim sesuai porsi partisipasinya. according to their participating portion.
Pada tanggal laporan, CSTS JO mempunyai proses As of reporting date, the CSTS JO has outstanding tax
pajak yang masih belum selesai untuk tahun pajak claims being process for the following fiscal years:
sebagai berikut:
Jumlah yang diklaim/ Bagian TPEC/ Bagian TPE/
Total claimed TPEC's portion TPE's portion
30 September/ 31 Desember/ 30 September/ 31 Desember/ 30 September/ 31 Desember/
Jenis surat pajak/ Masa pajak/ September 30, December 31, September 30, December 31, September 30, December 31, Status terakhir/
Type of tax letter Tax period 2024 2023 2024 2023 2024 2023 Current status
US$ US$ US$ US$ US$ US$
STP April - Mei/ - 141.038 - 39.491 - 2.821 Mengajukan banding ke Mahkamah Agung
April - May pada Juni 2023 atas sisa klaim
2019 pengembalian pajak. Pengajuan banding
ditolak pada 2024/ Filled an appeal to
supreme court in June 2023 for the
remaining tax claim. Judicial review
rejected in 2024.
STP Januari - Maret/ 804.309 789.805 225.206 221.145 16.086 15.796 Pengajuan pembatalan Surat Tagihan
January - March Pajak pada bulan Maret 2024/
2020 Submission of cancellation Notice of Tax
Assesment in March 2024
STP April - Mei/ April - May - 3.742.253 - 1.047.831 - 74.845 Pengembalian pajak telah diterima penuh
2020 pada bulan April 2024/ Tax refund fully
received in April 2024
STP Juni/ June 711.030 698.208 199.089 195.498 14.221 13.964 Pengajuan pembatalan Surat Tagihan
2020 Pajak pada bulan Maret 2024/
Submission of cancellation Notice of Tax
Assesment in March 2024
STP Juli - Oktober/ - 17.252.051 - 4.830.574 - 345.041 Pengembalian pajak telah diterima penuh
July - October pada bulan April dan Mei 2024/ Tax
refund fully received in April and May
2020
2024
STP Juli - Oktober/ 979.363 961.702 274.222 269.277 19.587 19.235 Pengajuan pembatalan Surat Tagihan
July - October Pajak pada bulan Maret 2024/
Submission of cancellation Notice of Tax
2020
Assesment in March 2024
STP Juli - Desember/ 113.149 111.109 31.682 31.111 2.263 2.222 Pengajuan denda pajak akan dilakukan
July - December setelah keputusan final di persidangan
atau keberatan/ Tax penalty claim would
2021
be claimed after final court judgement or
objection
STP Januari - Desember/ 192.186 188.720 53.812 52.842 3.844 3.774 Pengajuan denda pajak akan dilakukan
January - December setelah keputusan final di persidangan
2022 atau keberatan/ Tax penalty claim would
be claimed after final court judgement or
objection
STP Januari - Oktober/ 18.383.715 54.537.073 5.147.440 15.270.380 367.674 1.090.741 Pengembalian pajak periode Januari &
January - October Februari 2023 telah diterima penuh pada
2023 bulan April 2024, pengembalian pajak
periode Maret & April 2024 telah diterima
penuh pada bulan Juli 2024, dan
pengembalian pajak periode Mei & Juni
2024 telah diterima pada bulan
September 2024. Periode Juli sampai
dengan Oktober 2023 masih dalam tahap
pengajuan/ Tax refund period January &
February 2023 fully received in April
2024, tax refund March & April 2024 fully
received in July 2024, and tax refund
May & June 2024 fully received in
September 2024. Tax claim July until
October 2023 still on process
submission.
STP November - Desember/ 9.178.033 - 2.569.849 - 183.561 - Mengajukan permohonan klaim restitusi
November - December PPN pada Maret 2024/ Submitted request
to claim VAT refund in Maret 2024
2023
STP Januari - Februari/ 5.044.686 - 1.412.512 - 100.894 - Mengajukan permohonan klaim restitusi
Januari - February PPN pada April 2024/ Submitted request
2024 to claim VAT refund in April 2024
STP Maret - April/ 4.943.422 - 1.384.158 - 98.868 - Mengajukan permohonan klaim restitusi
March - April PPN pada Juli 2024/ Submitted request
2024 to claim VAT refund in July 2024
STP Mei - Juni/ 5.959.869 - 1.668.763 - 119.197 - Mengajukan permohonan klaim restitusi
May - June PPN pada Agustus 2024/ Submitted
2024 request to claim VAT refund in August
2024
Jumlah 12.966.733 21.958.149 926.195 1.568.439 Total
- 112 -
Page 117
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31,
2023 DAN UNTUK PERIODE SEMBILAN BULAN YANG 2023 AND FOR THE NINE-MONTH PERIODS ENDED
BERAKHIR PADA TANGGAL 30 SEPTEMBER 2024 DAN 2023 SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(TIDAK DIAUDIT) (Lanjutan) (Continued)
17. ASET EKSPLORASI DAN EVALUASI 17. EXPLORATION AND EVALUATION ASSETS
30 September/September 30 , 2024
Dipindahkan ke aset
tidak lancar yang
dimiliki untuk dijual
(Catatan 14)/
Transfer to non
Saldo awal/ Penambahan/ Pengurangan/ current assets held Saldo akhir/
Beginning balance Addition Deduction for sale (Note 14) Ending balance
US$ US$ US$ US$
NUS 102.123.524 9.692.052 - - 111.815.576 NUS
IIR 17.012.796 - - - 17.012.796 IIR
MEA 4.325.999 - - (4.325.999) - MEA
Jumlah 123.462.319 9.692.052 - (4.325.999) 128.828.372 Total
Cadangan kerugian Allowance for
penurunan nilai (21.338.795) - - 4.325.999 (17.012.796) impairment losses
Jumlah tercatat 102.123.524 111.815.576 Net carrying amount
31 Desember/December 31 , 2023
Dipindahkan ke
aset tidak lancar
yang dimiliki untuk
dijual (Catatan 14)/
Transfer to non
Saldo awal/ Penambahan/ Pengurangan/ current assets held Saldo akhir/
Beginning balance Addition Deduction for sale (Note 14) Ending balance
US$ US$ US$ US$ US$
NUS 98.350.757 3.772.767 - - 102.123.524 NUS
IIR 17.012.796 - - - 17.012.796 IIR
KJA 420.732 - (420.732) - - KJA
MEA 4.325.999 - - - 4.325.999 MEA
MUTU 5.940.222 3.034.348 - (8.974.570) - MUTU
Jumlah 126.050.506 6.807.115 (420.732) (8.974.570) 123.462.319 Total
Cadangan kerugian Allowance for
penurunan nilai (21.338.795) (21.338.795) impairment losses
Jumlah tercatat 104.711.711 102.123.524 Net carrying amount
Biaya pinjaman yang dikapitalisasi pada aset Borrowing costs capitalized to exploration and
eksplorasi dan evaluasi sejumlah US$ 1.879.509 evaluation assets amounted US$ 1,879,509 (2023:
(2023: US$ 2.423.922) dengan tingkat kapitalisasi US$ 2,423,922) with annual capitalized rate at
tahunan sebesar 10,92%. 10.92%.
Dengan pertimbangan bahwa aset batubara di proyek In view that its coal assets in Baliem project are not
Baliem tidak dapat memberikan hasil yang economically viable, management of IIR has decided
menguntungkan, maka pada bulan Desember 2015 to provide full provision for impairment on those
manajemen IIR memutuskan untuk melakukan assets amounting to US$ 17,012,796 in December
pencadangan atas penurunan nilai aset tersebut 2015.
sebesar US$ 17.012.796.
Sejak ditandatanganinya PPJB terkait dengan Since the signing of CSPA related to sale of IIR’s
penjualan saham IIR di MEA (Catatan 14), seluruh shares in MEA (Note 14), all assets related to MEA was
aset sehubungan dengan MEA direklasifikasi dan reclassified and presented as part of non-current
disajikan sebagai bagian dari aset tidak lancar assets held for sale.
tersedia untuk dijual.
- 113 -
Page 118
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31,
2023 DAN UNTUK PERIODE SEMBILAN BULAN YANG 2023 AND FOR THE NINE-MONTH PERIODS ENDED
BERAKHIR PADA TANGGAL 30 SEPTEMBER 2024 DAN 2023 SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(TIDAK DIAUDIT) (Lanjutan) (Continued)
18. PROPERTI PERTAMBANGAN 18. MINING PROPERTIES
Akun ini merupakan biaya yang ditransfer dari aset This account represents costs transferred from
eksplorasi dan evaluasi terkait area of interest, exploration and evaluation assets related to an area
evaluasi kelayakan teknis dan kelangsungan usaha of interest, technical feasibility and commercial
komersial yang dibuktikan, dan biaya selanjutnya viability of which are demonstrable, and subsequent
untuk menyiapkan tambang sampai ke tahap costs to develop the mine to the production phase.
produksi.
1 Januari/ 30 September/
January 1, Penambahan/ September 30,
2024 Additions 2024
US$ US$ US$
Biaya perolehan 28.916.004 681.778 29.597.782 Cost
Akumulasi amortisasi (23.208.373) (55.448) (23.263.821) Accumulated amortization
Nilai tercatat 5.707.631 6.333.961 Net carrying amount
Dipindahkan ke
aset tidak lancar
yang dimiliki
untuk dijual
(Catatan 14)/
Reklasifikasi Transfer to non
1 Januari/ (Catatan 22)/ current assets 31 Desember/
January 1, Penambahan/ Reclassification held for sale December 31,
2023 Additions (Note 22) (Note 14) 2023
US$ US$ US$ US$ US$
Biaya perolehan 82.033.698 855.809 (8.905.335) (45.068.168) 28.916.004 Cost
Akumulasi amortisasi (41.195.825) (2.683.303) 12.161 20.658.594 (23.208.373) Accumulated amortization
Cadangan kerugian penurunan nilai (10.934.214) - - 10.934.214 - Allowance for impairment losses
Nilai tercatat 29.903.659 5.707.631 Net carrying amount
Beban amortisasi dibebankan pada beban pokok Amortization expenses were charged to cost of
kontrak dan penjualan (Catatan 41). contracts and goods sold (Note 41).
19. KERJASAMA OPERASI 19. JOINT OPERATIONS
Chiyoda Corporation, PT Chiyoda International Chiyoda Corporation, PT Chiyoda International
Indonesia, PT Saipem Indonesia dan PT Suluh Ardhi Indonesia, PT Saipem Indonesia and PT Suluh Ardhi
Engineering Engineering
Pada tanggal 27 Oktober 2014, TPEC dan TPE On October 27, 2014, TPEC and TPE entered into an
melakukan perjanjian kerjasama operasi dengan unincorporated joint operation agreement with
Chiyoda Corporation, PT Chiyoda International Chiyoda Corporation, PT Chiyoda International
Indonesia, PT Saipem Indonesia dan PT Suluh Ardhi Indonesia, PT Saipem Indonesia and PT Suluh Ardhi
Engineering yang dikenal dengan nama CSTS Joint Engineering known as the CSTS Joint Operation
Operation (“CSTS JO”) dimana dilaksanakan (“CSTS JO”) in which joint control is exercised.
pengendalian bersama.
Bagian dari TPE dan TPEC dalam kerjasama ini secara TPE and TPEC’s portion in CSTS JO altogether is 30%,
keseluruhan adalah 30% yang mana secara internal, while internally they agreed to split the portion by
TPE dan TPEC sepakat untuk membagi 25,5%:4,5% 25.5%:4.5% for Front End Engineering Design (FEED)
untuk proyek Front End Engineering Design (FEED) and 2%:28% for Engineering, Procurement and
dan 2%:28% untuk proyek Engineering, Procurement Construction (EPC) project.
and Construction (EPC).
Pada tanggal 29 Oktober 2014, BP Berau Ltd dan On October 29, 2014, BP Berau Ltd and CSTS JO
CSTS JO menanda-tangani kontrak Front End signed the contract for Front End Engineering Design
Engineering Design (FEED) untuk Tangguh LNG (FEED) of Tangguh LNG Expansion Project, effective
Expansion Project, yang berlaku efektif tertanggal on December 5, 2014, to deliver FEED, plans and
5 Desember 2014 untuk melakukan FEED, rencana estimates for EPC contract, and submitting the tender
dan estimasi untuk kontrak EPC, dan mengajukan for EPC contract of Tangguh LNG Expansion Project.
tender untuk EPC kontrak dari Tangguh LNG
Expansion Project tersebut.
- 114 -
Page 119
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31,
2023 DAN UNTUK PERIODE SEMBILAN BULAN YANG 2023 AND FOR THE NINE-MONTH PERIODS ENDED
BERAKHIR PADA TANGGAL 30 SEPTEMBER 2024 DAN 2023 SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(TIDAK DIAUDIT) (Lanjutan) (Continued)
Pada tanggal 25 Agustus 2016, BP Berau Ltd dan On August 25, 2016, BP Berau Ltd and CSTS JO signed
CSTS JO menandatangani kontrak EPC untuk Proyek contract EPC of Tangguh LNG Expansion Project,
Ekspansi LNG Tangguh, yang telah diamandemen which has been amended several times, last through
beberapa kali, terakhir melalui amandemen No. 5 amendment No. 5 dated September 5, 2022. As of
tanggal 5 September 2022. Per tanggal 30 September September 30, 2024, the physical progress of this
2024, kemajuan secara fisik dari proyek ini telah project is 99.67%.
mencapai 99,67%.
Ringkasan keuangan di bawah ini merupakan jumlah The summarized financial information below
yang ditunjukkan dalam laporan keuangan operasi represents amounts shown in the joint operation’s
bersama: financial statements:
30 September/ 31 Desember/
September 30, December 31,
2024 2023
US$ US$
Jumlah aset 343.034.403 474.375.583 Total assets
Jumlah liabilitas 524.023.330 604.391.206 Total liabilities
2024 2023
US$ US$
Jumlah pendapatan 139.945.491 124.976.512 Total revenue
Jumlah beban 196.006.902 249.926.112 Total expenses
20. UANG MUKA DAN ASET TIDAK LANCAR LAINNYA 20. ADVANCES AND OTHER NON-CURRENT ASSETS
30 September/ 31 Desember/
September 30, December 31,
2024 2023
US$ US$
Investasi Saham Investment in shares of stock
Pihak ketiga Third parties
Alpha JWC Ventures II L.P. 11.931.246 14.791.349 Alpha JWC Ventures II L.P.
Alpha Kenangan 6.720.508 6.718.742 Alpha Kenangan
Kreasi Media Indonesia L.P. 2.824.181 2.920.311 Kreasi Media Indonesia L.P.
Trendlines Agrifood Fund Pte Ltd 1.720.072 1.541.269 Trendlines Agrifood Fund Pte Ltd
Shift4Good S.A.S 1.468.419 1.171.050 Shift4Good S.A.S
PT Sarana Riau Ventura 1.211 1.211 PT Sarana Riau Ventura
Uang muka proyek 23.832.076 14.668.148 Advance for project
Lain-lain (masing-masing dibawah US$ 2 juta) 6.042.808 4.504.847 Others (each below US$ 2 million)
Jumlah 54.540.521 46.316.927 Total
Uang muka proyek Advances for project
Uang muka proyek sebagian besar merupakan Advances for projects mainly represent payments of
pembayaran uang muka untuk kerja sama dan advances for cooperation and new business
pengembangan bisnis baru oleh Perusahaan, KJA, IIR, development by the Company, KJA, IIR, IMP and
IMP dan IMUG. IMUG.
- 115 -
Page 120
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31,
2023 DAN UNTUK PERIODE SEMBILAN BULAN YANG 2023 AND FOR THE NINE-MONTH PERIODS ENDED
BERAKHIR PADA TANGGAL 30 SEPTEMBER 2024 DAN 2023 SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(TIDAK DIAUDIT) (Lanjutan) (Continued)
21. TANAMAN PRODUKTIF – TANAMAN BELUM 21. BEARER PLANTS – IMMATURE PLANTATIONS
MENGHASILKAN
1 Januari/ 30 September/
January 1, Penambahan/ September 30,
2024 Additions 2024
US$ US$ US$
Kaliandra 9.750.025 2.929.989 12.680.014 Kaliandra
1 Januari/ 31 Desember/
January 1, Penambahan/ December 31,
2023 Additions 2023
US$ US$ US$
Kaliandra 584.448 9.165.577 9.750.025 Kaliandra
Tanaman produktif belum menghasilkan merupakan Bearer plant – immature plantation reflect costs
biaya-biaya yang terjadi sehubungan dengan incurred in connection with the development of the
pengembangan tanaman perkebunan (tanaman plantations (tanaman kaliandra merah) such as land
kaliandra merah) seperti persiapan lahan, preparation, planting, fertilizing and other
penanaman, pemupukan dan aktivitas pemeliharaan maintenance activities carried out until the plantation
lainnya yang dilakukan sampai dengan tanaman matures.
tersebut menghasilkan.
22. ASET TETAP 22. PROPERTY, PLANT AND EQUIPMENT
Dipindahkan ke aset
Penambahan Selisih kurs tidak lancar yang
atas akuisisi penjabaran dimiliki untuk dijual
entitas anak laporan (Catatan 14)/
(Catatan 1d)/
1 Januari/ Addition due keuangan/ Transfer to non 30 September/
January 1, Penambahan/ to acquisition Pengurangan/ Translation current assets held September 30,
2024 Additions of subsidiary Deductions adjustments for sale (Note 14) 2024
US$ US US$ US$ US$ US$ US$
Biaya perolehan: At cost:
Pemilikan langsung Direct acquisitions
Tanah 40.538.418 856.383 3.724.144 (199) 214.336 - 45.333.082 Land
Bangunan, infrastruktur, prasarana Buildings, infrastructure,
dan perbaikan bangunan 257.513.956 12.012.049 2.327.731 (1.361.207) 386.595 (24.629) 270.854.495 leasehold and improvements
Perabotan, perlengkapan dan Office furniture, fixtures and
peralatan kantor lainnya 62.513.883 6.106.923 1.182.834 (581.812) 158.891 (88.557) 69.292.162 other equipment
Kapal 347.851 - - - - - 347.851 Vessels
Kendaraan bermotor 22.415.237 2.036.077 71.122 (437.861) 2.672 (12.987) 24.074.260 Motor vehicles
Mesin dan peralatan 181.736.175 1.842.180 3.889.577 (399.836) 71.332 - 187.139.428 Machinery and equipment
Alat berat, peralatan, pengangkutan Plant, equipment, heavy
dan kendaraan 165.131.475 6.750.769 2.644.539 (112.756) 225.625 - 174.639.652 equipment and vehicles
Aset dalam penyelesaian 97.489.371 32.634.903 95.575 - (106.087) (1.622.363) 128.491.399 Construction in-progress
Jumlah 827.686.366 62.239.284 13.935.522 (2.893.671) 953.364 (1.748.536) 900.172.329 Total
Akumulasi penyusutan: Accumulated depreciation:
Pemilikan langsung Direct acquisitions
Bangunan, infrastruktur, prasarana Buildings, infrastructure,
dan perbaikan bangunan 184.994.574 3.859.909 593.204 (1.346.428) 151.253 (8.158) 188.244.354 leasehold and improvements
Perabotan, perlengkapan dan Office furniture, fixture and
peralatan kantor lainnya 40.430.570 4.479.374 1.049.311 (564.814) 218.349 (67.770) 45.545.020 other equipment
Kapal 347.851 - - - - - 347.851 Vessels
Kendaraan bermotor 6.884.816 1.714.572 63.192 (548.399) 590.793 (11.015) 8.693.959 Motor vehicles
Mesin dan peralatan 139.902.397 1.497.450 1.661.620 (399.375) 12.441 - 142.674.533 Machinery and equipment
Alat berat, peralatan, pengangkutan Plant, equipment, heavy
dan kendaraan 145.423.303 2.710.751 2.217.330 - 658.260 - 151.009.644 equipment and vehicles
Sub-jumlah 517.983.511 14.262.056 5.584.657 (2.859.016) 1.631.096 (86.943) 536.515.361 Sub-total
Cadangan kerugian penurunan nilai 2.581.733 - - - - (1.654.009) 927.724 Allowance for impairment losses
Jumlah Tercatat 307.121.122 362.729.244 Net Carrying Amount
- 116 -
Page 121
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31,
2023 DAN UNTUK PERIODE SEMBILAN BULAN YANG 2023 AND FOR THE NINE-MONTH PERIODS ENDED
BERAKHIR PADA TANGGAL 30 SEPTEMBER 2024 DAN 2023 SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(TIDAK DIAUDIT) (Lanjutan) (Continued)
Dipindahkan ke aset Dipindahkan ke aset
Penambahan atas Selisih kurs tidak lancar yang tidak lancar yang
akuisisi entitas penjabaran dimiliki untuk dijual dimiliki untuk dijual
anak (Catatan 1)/ laporan (Catatan 14)/ (Catatan 14)/ Reklasifikasi
Addition due to
1 Januari/ keuangan/ Transfer to non Transfer to non (Catatan 18)/ 31 Desember/
acquisition of
January 1, Penambahan/ subsidiary Pengurangan/ Translation current assets held current assets held Reclassifications December 31,
2023 Additions (Note 1) Deductions adjustments for sale (Note 14) for sale (Note 14) (Note 18) 2023
US$ US US$ US$ US$ US$ US$ US$ US$
Biaya perolehan: At cost:
Pemilikan langsung Direct acquisitions
Tanah 48.390.094 333.137 9.990 (3.270.475) - (4.755.777) (168.551) - 40.538.418 Land
Bangunan, infrastruktur, prasarana Buildings, infrastructure,
dan perbaikan bangunan 300.477.419 7.662.061 147.230 (3.741.945) 112.141 (981.658) (55.028.859) 8.867.567 257.513.956 leasehold and improvements
Perabotan, perlengkapan dan Office furniture, fixtures and
peralatan kantor lainnya 58.941.375 5.736.740 236.729 (405.371) 46.523 (25.558) (2.016.555) - 62.513.883 other equipment
Kapal 533.124 - - (185.273) - - - - 347.851 Vessels
Kendaraan bermotor 13.411.730 10.059.447 336.590 (649.668) 74.152 - (817.014) - 22.415.237 Motor vehicles
Mesin dan peralatan 188.349.142 1.922.648 - (2.693.411) 5.691 - (5.885.663) 37.768 181.736.175 Machinery and equipment
Alat berat, peralatan, pengangkutan Plant, equipment, heavy
dan kendaraan 143.727.415 23.687.589 2.009.364 (3.250.504) (21.699) - (1.020.690) - 165.131.475 equipment and vehicles
Aset dalam penyelesaian 24.245.560 87.834.018 - (25.014) 448.613 - (15.013.806) - 97.489.371 Construction in-progress
Jumlah 778.075.859 137.235.640 2.739.903 (14.221.661) 665.421 (5.762.993) (79.951.138) 8.905.335 827.686.366 Total
Akumulasi penyusutan: Accumulated depreciation:
Pemilikan langsung Direct acquisitions
Bangunan, infrastruktur, prasarana Buildings, infrastructure,
dan perbaikan bangunan 213.190.621 3.907.069 101.834 (3.605.972) (36.251) (92.163) (28.482.122) 11.558 184.994.574 leasehold and improvements
Perabotan, perlengkapan dan Office furniture, fixture and
peralatan kantor lainnya 37.325.058 4.997.217 179.967 (404.627) 34.524 (20.766) (1.680.803) - 40.430.570 other equipment
Kapal 533.124 - - (185.273) - - - - 347.851 Vessels
Kendaraan bermotor 6.054.363 2.041.386 146.395 (632.752) (9.509) - (715.067) - 6.884.816 Motor vehicles
Mesin dan peralatan 144.974.853 1.506.012 - (2.693.401) 101 - (3.885.771) 603 139.902.397 Machinery and equipment
Alat berat, peralatan, pengangkutan Plant, equipment, heavy
dan kendaraan 143.727.414 3.971.312 1.880.628 (3.250.504) (9.942) - (895.605) - 145.423.303 equipment and vehicles
Sub-jumlah 545.805.433 16.422.996 2.308.824 (10.772.529) (21.077) (112.929) (35.659.368) 12.161 517.983.511 Sub-total
Cadangan kerugian penurunan nilai 11.619.347 - - - - - (9.037.614) - 2.581.733 Allowance for impairment losses
Jumlah Tercatat 220.651.079 307.121.122 Net Carrying Amount
Beban penyusutan dialokasikan sebagai berikut: Depreciation expense was allocated to the following:
2024 2023
US$ US$
Beban pokok kontrak dan penjualan
(Catatan 41) 11.702.015 10.486.918 Cost of contracts and goods sold (Note 41)
Beban penjualan, umum dan Selling, general and administrative
administrasi (Catatan 42) 2.560.041 1.817.160 expenses (Note 42)
Jumlah 14.262.056 12.304.078 Total
Perincian keuntungan pelepasan aset tetap adalah Details of the gain on disposal of property, plant and
sebagai berikut: equipment are as follows:
2024 2023
US$ US$
Nilai realisasi 76.665 145.681 Proceeds
Jumlah tercatat (34.655) (66.552) Net carrying amounts
Keuntungan pelepasan (Catatan 45) 42.010 79.129 Gain on disposal (Note 45)
Rincian aset dalam penyelesaian pada tanggal Details of construction in-progress as of
30 September 2024 adalah sebagai berikut: September 30, 2024, are as follows:
30 September/September 30, 2024
Persentase Estimasi tahun
Penyelesaian/ Akumulasi Biaya/ Penyelesaian/
Percentage of Accumulated Estimated Year of
Completion Costs Completion
US$
Bangunan, prasarana dan perbaikan Buildings, leasehold and
bangunan 85 - 98% 3.862.106 2024 improvements
Mesin dan peralatan 80 - 90% 103.701.549 2024 Machinery and equipment
Alat berat, peralatan, pengangkutan Plant, equipment, heavy equipment
dan kendaraan 80 - 95% 20.927.744 2024 and vehicles
Jumlah 128.491.399 Total
Manajemen tidak melihat adanya peristiwa yang akan Management does not foresee any events that may
menghambat penyelesaian aset dalam penyelesaian prevent the completion of the constructions
tersebut. in-progress.
- 117 -
Page 122
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31,
2023 DAN UNTUK PERIODE SEMBILAN BULAN YANG 2023 AND FOR THE NINE-MONTH PERIODS ENDED
BERAKHIR PADA TANGGAL 30 SEPTEMBER 2024 DAN 2023 SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(TIDAK DIAUDIT) (Lanjutan) (Continued)
Biaya pinjaman yang dikapitalisasi pada aset dalam Borrowing costs capitalized to construction in
penyelesaian sejumlah US$ 7.217.099 (2023: progress amounted to US$ 7.217.099 (2023:
US$ 2.008.378) dengan tingkat kapitalisasi tahunan US$ 2,008,378) with annual capitalized rate at
sebesar 10,92%. 10.92%.
Berdasarkan IUPK sebagai Kelanjutan Operasi Based on IUPK as a Continuation of Contract/
Kontrak/Perjanjian, KJA berhak menggunakan Agreement, KJA has the right to utilise all State-
seluruh Barang Milik Negara yang diperoleh selama Owned Assets which had been acquired during the
masa PKP2B sesuai dengan peraturan perundang- CCoW period in accordance with the prevailing laws
undangan yang berlaku. and regulations.
Hak Guna Bangunan (HGB) Building Use Rights (HGB)
Perusahaan memiliki beberapa bidang tanah di The Company owns several pieces of land located in
Bintaro, Tangerang Selatan seluas 40.343 meter Bintaro, South Tangerang measuring 40,343 square
persegi dengan Hak Guna Bangunan (HGB) yang meters with Building Use Rights (HGB) for certain
akan jatuh tempo antara 2038 sampai 2040. periods expiring between 2038 to 2040.
ILSS memiliki beberapa bidang tanah di Kariangau, ILSS owns several pieces of land located in
Kalimantan Timur seluas 32.880 meter persegi Kariangau, East Kalimantan measuring 32,880
dengan HGB selama 30 tahun dan tanggal square meters with HGB for a period of 30 years and
berakhirnya hak di tahun 2025. expiration date in 2025.
IMU memiliki beberapa bidang tanah di Kariangau, IMU owns several pieces of land located in Kariangau,
Kalimantan Timur seluas 171.527 meter persegi East Kalimantan measuring 171,527 square meters
dengan HGB selama 20 sampai 30 tahun dan tanggal with HGB for a period of 20 to 30 years and expiration
berakhirnya hak berkisar antara tahun 2025 sampai dates ranging from 2025 until 2041.
dengan tahun 2041.
TPEC memiliki beberapa bidang tanah yang berlokasi TPEC owns several pieces of land located in Jakarta
di Jakarta dengan hak legal berupa HGB untuk jangka with HGB for 20 years until 2029.
waktu 20 tahun, yang akan jatuh tempo pada tahun
2029.
TPE memiliki tanah yang berlokasi di Kelurahan TPE owns land located in Banyuraden Village,
Banyuraden, Kecamatan Gamping, Kabupaten Subdistrict of Gamping, District of Sleman,
Sleman, Yogyakarta dengan hak legal berupa HGB Yogyakarta with HGB until 2044.
yang akan jatuh tempo pada 2044.
IMP memiliki beberapa bidang tanah di Batu Sopang, IMP owns several pieces of land located in Batu
Kalimantan Timur seluas 199.800 meter persegi Sopang, East Kalimantan measuring 199,800 square
dengan HGB selama 30 tahun, yang akan jatuh tempo meters with HGB for 30 years until 2051.
pada tahun 2051.
NAN memiliki tanah di Solo-Sragen, Jawa Tengah NAN owns land located in Solo-Sragen, Central Java
seluas 12.471 meter persegi dengan HGB selama 20 measuring 12,471 square meters with HGB for 20
tahun, yang akan jatuh tempo pada tahun 2039. years until 2039.
GSI memiliki sebidang tanah di Setiabudi, Jakarta GSI owns pieces of land located in Setiabudi, Jakarta
seluas 632 meter persegi dengan HGB yang akan measuring 632 square meters with HGB which expire
jatuh tempo di tahun 2038. in 2038.
Manajemen berpendapat tidak terdapat masalah Management believes that there will be no difficulty
dengan perpanjangan hak atas tanah karena seluruh in the extension of the land rights since all the lands
tanah diperoleh secara sah dan didukung dengan were acquired legally and supported by sufficient
bukti kepemilikan yang memadai. evidence of ownership.
Aset tetap yang dijaminkan Property, plant and equipment used as collateral
TPE TPE
Pada 21 Juni 2018, melalui Surat On June 21, 2018, by Letter No. TPE/041/VI/2018,
No. TPE/041/VI/2018, TPE menyetujui untuk TPE agreed to use as collateral the asset in form of
menjaminkan aset berupa 2 bidang tanah (HGB two plots of land (HGB No. 00467 and HGB
No. 00467 dan HGB No. 00468) kepada Bank Mandiri No. 00468) to Bank Mandiri for working capital credit
untuk fasilitas kredit modal kerja yang diberikan facility granted to TPEC.
kepada TPEC.
- 118 -
Page 123
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31,
2023 DAN UNTUK PERIODE SEMBILAN BULAN YANG 2023 AND FOR THE NINE-MONTH PERIODS ENDED
BERAKHIR PADA TANGGAL 30 SEPTEMBER 2024 DAN 2023 SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(TIDAK DIAUDIT) (Lanjutan) (Continued)
Pada tanggal 30 September 2024, aset berupa fidusia On September 30, 2024, fiduciary security over
atas kendaraan dengan nilai buku US$ 3.685.880 (31 vehicles with net book value fo US$ 3,685,880
Desember 2023: US$ 3.666.651) dijadikan jaminan (December 31, 2023: US$ 3,666,651) was used as
atas pinjaman TPE dari PT Bank Mandiri (Persero) Tbk collateral for TPE’s loans from PT Bank Mandiri
(Catatan 27). (Persero) Tbk (Note 27).
NAN NAN
Tanah dan bangunan pabrik, SHGB No. 00183/ dagen Land and factory building, SHGB No. 00183/ dagen
atas nama NAN di Jl. Solo-Sragen KM 7, Karanganyar, owned by NAN located at Jl. Solo Sragen KM 7,
Jawa Tengah dijadikan sebagai jaminan atas Karanganyar, Central Java was used as collateral to
pinjaman bank (Catatan 31). bank loan (Note 31).
Aset tetap dan sebagian aset hak-guna, kecuali Property, plant and equipment and certain right-of-
tanah, telah diasuransikan kepada beberapa use assets, except land, are insured with various
perusahaan asuransi terhadap risiko kebakaran, insurance companies against fire, theft and other
pencurian dan risiko lainnya dengan jumlah possible risks, as follows:
pertanggungan sebagai berikut:
Jumlah pertanggungan/ Sum insured
30 September/ 31 Desember/
Perusahaan asuransi/ Mata uang/ September 30, December 31,
Insurance company Currency 2024 2023
PT Asuransi Cakrawala Proteksi Rp 297.022.236.466 261.146.753.809
PT Asuransi Central Asia Rp 146.330.439.083 10.838.558.000
PT Asuransi Sinar Mas Rp 90.648.010.000 90.648.010.000
PT Asuransi Multi Artha Guna Tbk Rp 71.008.151.755 71.008.151.755
PT Adi Antara Asia Rp 10.720.000.000 -
PT Asuransi Astra Buana Rp 5.732.262.000 5.732.262.000
PT Asuransi Artarindo Rp 5.257.257.788 5.257.257.788
PT Asuransi Wahana Tata Rp 3.822.910.000 3.822.910.000
PT Asuransi Malacca Trust Wuwungan Indonesia Rp 2.470.350.000 2.470.350.000
PT Lippo General Insurance Tbk Rp 184.680.000 184.680.000
PT MNC Asuransi Indonesia Rp - 4.018.200.000
PT Asuransi Candi Utama Rp - 46.629.713
PT Asuransi Central Asia US$ 810.416.421 18.749.945
PT Asuransi Cakrawala Proteksi US$ 340.145.687 245.549.115
PT Aon Indonesia US$ 43.144.500 -
PT Asuransi Tripakarta US$ 22.499.934 22.499.934
PT Asuransi Candi Utama US$ 18.749.945 -
PT Asuransi Jasa Raharja Putera US$ 16.499.952 16.499.952
PT Asuransi Jasa Indonesia US$ 14.999.956 14.999.956
PT Asuransi Wahana Tata US$ 13.078.221 13.078.221
PT Asuransi Tugu Pratama Indonesia US$ 11.249.967 11.249.967
PT Asuransi Marsh Indonesia US$ 37.505 37.505
PT Asuransi Dayin Mitra Tbk US$ 22.762 -
PT Asuransi Malacca Trust Wuwungan Indonesia US$ - 20.145.425
Manajemen berpendapat bahwa nilai pertanggungan Management believes that the insurance coverages
tersebut cukup untuk menutupi kemungkinan are adequate to cover possible losses on the related
timbulnya kerugian atas aset yang dipertanggungkan. assets insured.
Pada tanggal 30 September 2024, aset tetap As of September 30, 2024, property, plant and
termasuk aset yang telah habis disusutkan tetapi equipment includes assets with acquisition cost of
masih digunakan dengan harga perolehan sebesar US$ 486,787,929 (December 31, 2023:
US$ 486.787.929 (31 Desember 2023: US$ 482,758,390), that are fully depreciated but still
US$ 482.758.390). in use.
- 119 -
Page 124
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31,
2023 DAN UNTUK PERIODE SEMBILAN BULAN YANG 2023 AND FOR THE NINE-MONTH PERIODS ENDED
BERAKHIR PADA TANGGAL 30 SEPTEMBER 2024 DAN 2023 SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(TIDAK DIAUDIT) (Lanjutan) (Continued)
Penurunan nilai aset tetap Impairment of property, plant and equipment
TPEC TPEC
Pada tahun 2019, penurunan nilai atas bangunan In 2019, the impairment loss of building amounted to
adalah sebesar US$ 872.991. US$ 872,991
MEA MEA
Pada tahun 2015, manajemen IIR berpendapat bahwa In 2015, management of IIR viewed that its coal
aset batubara di MEA saat ini tidak akan dapat assets in MEA are not economically viable at the
memberikan hasil yang menguntungkan pada kondisi respective coal market condition and therefore
pasar batubara saat itu, oleh karenanya memutuskan decided to provide full provision for impairment on its
untuk melakukan pencadangan atas penurunan nilai property, plant and equipment. Total impairment loss
terhadap aset tetap MEA. Jumlah kerugian penurunan charged to profit or loss in 2015 amounted to
nilai yang diakui dalam laba rugi pada tahun 2015 US$ 1,654,009.
sebesar US$ 1.654.009.
Manajemen berkeyakinan bahwa penurunan nilai aset Management believes that the allowance for
tetap tersebut adalah cukup. impairment of property, plant, and equipment is
adequate.
Sejak ditandatanganinya PPJB terkait dengan Since the signing of CSPA related to sale of IIR’s
penjualan saham IIR di MEA (Catatan 14), seluruh shares in MEA (Note 14), all assets related to MEA
aset sehubungan dengan MEA direklasifikasi dan was reclassified and presented as part of non-current
disajikan sebagai bagian dari aset tidak lancar tersedia assets held for sale.
untuk dijual.
23. ASET HAK-GUNA 23. RIGHT-OF-USE ASSETS
Grup menyewa beberapa aset termasuk ruang kantor, The Group leases several assets including office
alat berat, peralatan dan kendaraan dan tanah. Masa space, plant, equipment and vehicles and parcels of
sewa adalah 2 - 15 tahun. land. The average lease term is 2 - 15 years.
Grup memiliki opsi untuk membeli peralatan berat The Group has options to purchase certain heavy
tertentu dengan jumlah nominal pada akhir masa equipment for a nominal amount at the end of the
sewa. Kewajiban Grup dijamin dengan hak milik lease term. The Group’s obligations are secured by the
pesewa atas aset yang disewa untuk sewa tersebut. lessors’ title to the leased assets for such leases.
Rekonsiliasi kelompok-kelompok utama aset hak- The reconciliation of right-of-use assets and lease
guna dan liabilitas sewa adalah sebagai berikut: liabilities by major classifications was as follows:
1 Januari/ 30 September/
January 1, Penambahan/ Pengurangan/ Translasi/ September 30,
2024 Additions Deductions Translation 2024
US$ US$ US$ US$ US$
Biaya perolehan: At cost:
Gedung dan perbaikan gedung 7.303.410 4.517.919 (214.839) 1.293 11.607.783 Building and improvements
Kendaraan bermotor 5.235.997 437.048 (38.610) 12.550 5.646.985 Motor vehicles
Perabotan, perlengkapan dan Office furniture, fixtures and
peralatan kantor lainnya 6.150.552 - - - 6.150.552 other equipment
Alat berat, peralatan, pengangkutan Plant, equipment, heavy
dan kendaraan 52.464.948 2.899.090 (3.580.572) - 51.783.466 equipment and vehicles
Aset dalam penyelesaian 219.263 - - - 219.263 Construction in progress
Jumlah 71.374.170 7.854.057 (3.834.021) 13.843 75.408.049 Total
Akumulasi penyusutan: Accumulated depreciation:
Gedung dan perbaikan gedung 6.782.180 3.744.740 (122.871) (146) 10.403.903 Building and improvements
Kendaraan bermotor 5.397.014 185.367 (38.610) 12.816 5.556.587 Motor vehicles
Perabotan, perlengkapan dan Office furniture, fixtures and
peralatan kantor lainnya 4.148.578 1.993 - - 4.150.571 other equipment
Alat berat, peralatan, pengangkutan Plant, equipment, heavy
dan kendaraan 38.081.987 7.310.076 (3.580.572) - 41.811.491 equipment and vehicles
Jumlah 54.409.759 11.242.176 (3.742.053) 12.670 61.922.552 Total
Jumlah Tercatat Bersih 16.964.411 13.485.497 Net Carrying Amount
- 120 -
Page 125
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31,
2023 DAN UNTUK PERIODE SEMBILAN BULAN YANG 2023 AND FOR THE NINE-MONTH PERIODS ENDED
BERAKHIR PADA TANGGAL 30 SEPTEMBER 2024 DAN 2023 SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(TIDAK DIAUDIT) (Lanjutan) (Continued)
Dipindahkan ke
Penambahan aset tidak lancar
atas akuisisi yang dimiliki
entitas anak untuk dijual
(Catatan 1)/ (Catatan 14)/
Addition due Transfer to non
1 Januari/ to acquisition current assets 31 Desember/
January 1, Penambahan/ of subsidiary Pengurangan/ Translasi/ held for sale December 31,
2023 Additions (Note 1) Deductions Translation (Note 14) 2023
US$ US$ US$ US$ US$ US$ US$
Biaya perolehan: At cost:
Gedung dan perbaikan gedung 5.257.960 2.436.483 - (117.851) (5.712) (267.470) 7.303.410 Building and improvements
Kendaraan bermotor 6.602.752 361.889 - - (9.010) (1.719.634) 5.235.997 Motor vehicles
Perabotan, perlengkapan dan Office furniture, fixtures and
peralatan kantor lainnya 6.149.985 8.425 - (7.858) - - 6.150.552 other equipment
Alat berat, peralatan, pengangkutan Plant, equipment, heavy
dan kendaraan 38.041.886 21.191.683 23.287.679 (24.409.347) - (5.646.953) 52.464.948 equipment and vehicles
Aset dalam penyelesaian 219.263 - - - - - 219.263 Construction in progress
Jumlah 56.271.846 23.998.480 23.287.679 (24.535.056) (14.722) (7.634.057) 71.374.170 Total
Akumulasi penyusutan: Accumulated depreciation:
Gedung dan perbaikan gedung 5.052.640 1.995.117 - (102.411) 914 (164.080) 6.782.180 Building and improvements
Kendaraan bermotor 6.259.968 621.970 - - (131) (1.484.793) 5.397.014 Motor vehicles
Perabotan, perlengkapan dan Office furniture, fixtures and
peralatan kantor lainnya 4.062.667 93.769 - (7.858) - - 4.148.578 other equipment
Alat berat, peralatan, pengangkutan Plant, equipment, heavy
dan kendaraan 37.070.142 8.656.093 22.371.482 (24.409.347) - (5.606.383) 38.081.987 equipment and vehicles
Jumlah 52.445.417 11.366.949 22.371.482 (24.519.616) 783 (7.255.256) 54.409.759 Total
Jumlah Tercatat Bersih 3.826.429 16.964.411 Net Carrying Amount
Beban penyusutan dialokasikan sebagai berikut: Depreciation expense was allocated to the following:
2024 2023
US$ US$
Beban pokok kontrak dan penjualan Cost of contracts and goods sold
(Catatan 41) 7.345.765 6.324.969 (Note 41)
Beban penjualan umum dan administrasi Selling, general and administrative expenses
(Catatan 42) 3.896.411 1.383.661 (Note 42)
Jumlah 11.242.176 7.708.630 Total
Selama periode sembilan bulan yang berakhir tanggal For the nine-month period ended September 30,
30 September 2024, sewa aset tetap tertentu telah 2024, certain leases expired. The expired contracts
berakhir. Kontrak yang telah berakhir digantikan were replaced by new leases for identical underlying
dengan sewa baru untuk aset pendasar yang identik. assets. This resulted in additions to right-of- use
Hal ini mengakibatkan penambahan pada aset hak- assets of US$ 7,854,057 within the period (2023:
guna sebesar US$ 7.854.057 selama periode tersebut US$ 21,607,377).
(2023: US$ 21.607.377).
Beberapa transaksi sewa gedung atau gudang dan Some leases of buildings or warehouses and plant,
alat berat, peralatan dan kendaraan mengandung opsi equipment and vehicles contain extension options
perpanjangan yang dapat diambil oleh Grup sebelum exercisable by the Group before the end of the non-
masa berakhirnya kontrak yang tidak dapat cancellable contract period. The extension options
dibatalkan. Opsi perpanjangan yang dimiliki hanya held are exercisable only by the Group. The Group
dapat diambil oleh Grup. Grup mengevaluasi pada assesses at lease commencement whether it is
awal dimulainya masa sewa apakah besar reasonably certain to exercise the extension options.
kemungkinan akan diambilnya opsi perpanjangan. The Group reassesses this assessment if there is a
Grup mengevaluasi kembali penentuan ini apabila ada significant event or significant change in
peristiwa signifikan atau ada perubahan keadaan circumstances within its control.
signifikan di dalam kendali Grup.
- 121 -
Page 126
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31,
2023 DAN UNTUK PERIODE SEMBILAN BULAN YANG 2023 AND FOR THE NINE-MONTH PERIODS ENDED
BERAKHIR PADA TANGGAL 30 SEPTEMBER 2024 DAN 2023 SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(TIDAK DIAUDIT) (Lanjutan) (Continued)
24. ASET TIDAK BERWUJUD 24. INTANGIBLE ASSETS
Dipindahkan ke aset
Penambahan atas tidak lancar yang
akuisisi entitas anak dimiliki untuk dijual
(Catatan 1d)/ (Catatan 14)/
1 Januari/ Addition due to Transfer to non current 30 September/
January 1, acquisition of Penambahan/ Pengurangan/ assets held for sale September 30,
2024 subsidiary (Note 1d) Additions Deductions (Note 14) 2024
US$ US$ US$ US$ US$
Biaya perolehan At cost
Akuisisi entitas anak perusahaan: Acquisition of subsidiaries:
KJA 701.662.765 - - (701.662.765) - - KJA
MEA 65.071.555 - - - (65.071.555) - MEA
Masmindo 15.580.233 - - - - 15.580.233 Masmindo
IMP IMP
TMK 5.008.781 - - - - 5.008.781 TMK
JBP 2.976.523 - - - - 2.976.523 JBP
DPP 1.525.782 - - - - 1.525.782 DPP
TCG 2.719.901 - - - (2.719.901) - TCG
NAN - 4.418.787 - - - 4.418.787 NAN
PIM 3.607.267 - - - - 3.607.267 PIM
BIG 2.072.816 - - - - 2.072.816 BIG
EMB 1.367.520 - - - - 1.367.520 EMB
Sub-jumlah 801.593.143 4.418.787 - (701.662.765) (67.791.456) 36.557.709 Sub-total
Pengembangan sistem dan perangkat System development and
lunak komputer 13.131.696 509.798 1.439.784 - - 15.081.278 computer software
Aset tidak berwujud lainnya 1.593.765 - 321.918 - - 1.915.683 Other intangible asset
Jumlah 816.318.604 4.928.585 1.761.702 (701.662.765) (67.791.456) 53.554.670 Total
Akumulasi amortisasi Accumulated amortization
Akuisisi entitas anak perusahaan: Acquisition of subsidiaries:
KJA 701.662.765 - - (701.662.765) - - KJA
MEA 34.859.758 - - - (34.859.758) - MEA
IMP IMP
TMK 626.098 - 184.776 - - 810.874 TMK
JBP 297.652 - 87.845 - - 385.497 JBP
DPP 101.719 - 45.030 - - 146.749 DPP
TCG 194.278 - 48.570 - (242.848) - TCG
PIM 264.754 - 297.848 - - 562.602 PIM
BIG 192.865 - 157.799 - - 350.664 BIG
EMB 291.369 - 159.390 - - 450.759 EMB
Sub-jumlah 738.491.258 - 981.258 (701.662.765) (35.102.606) 2.707.145 Sub-total
Pengembangan sistem dan perangkat System development and
lunak komputer 10.162.954 348.543 300.863 - - 10.812.360 computer software
Aset tidak berwujud lainnya 13.437 - 246.741 - - 260.178 Other intangible asset
Jumlah 748.667.649 348.543 1.528.862 (701.662.765) (35.102.606) 13.779.683 Total
Cadangan kerugian penurunan nilai (Catatan 14) 30.889.820 - 853.758 - (30.211.797) 1.531.781 Allowance for impairment losses (Note 14)
Jumlah Tercatat 36.761.135 38.243.206 Net Carrying Amount
Beban amortisasi dialokasikan sebagai berikut: Amortization expense was allocated to the following:
2024 2023
US$ US$
Disajikan secara terpisah dalam laba rugi 981.258 36.307.205 Recognized separately in profit or loss
Beban penjualan, umum dan administrasi Selling, general and administrative
(Catatan 42) 300.814 2.737.933 expenses (Note 42)
Beban pokok kontrak dan penjualan
(Catatan 41) 246.790 116.521 Cost of contracts and goods sold (Note 41)
Jumlah 1.528.862 39.161.659 Total
KJA KJA
Aset tidak berwujud ini terkait dengan hak tambang The intangible assets pertain to mining rights (CCoW)
(PKP2B) Kideco yang telah berakhir pada bulan Maret of Kideco which expired in March 2023, hence such
2023, sehingga aset ini juga telah diamortisasi secara asset was also fully amortized as of March 31, 2023.
penuh pada tanggal 31 Maret 2023.
Untuk keperluan penyajian, karena KJA sudah For presentation purpose, as KJA has already
mendapatkan ijin IUPK sebagai kelanjutan dari obtained IUPK as a continuation of CCoW, all cost and
PKP2B, seluruh saldo harga perolehan dan akumulasi accumulated amortization of the intangible assets
amortisasi aset tidak berwujud yang terkait dengan related to CCoW with net book value of US$nil was
PKP2B dengan nilai buku US$nihil, dihilangkan dari removed from the above table.
tabel diatas.
MEA MEA
Aset tidak berwujud ini berasal dari akuisisi The intangible assets resulted from the acquisition of
MEA yang bergerak di bidang pertambangan batubara MEA, a company engaged in business of mining
dengan Izin Usaha Pertambangan yang terletak di activities under Mining Coal Exploration Permit
Kutai Timur – Kalimantan Timur. located in the East Kutai – East Kalimantan.
Nilai wajar aset tidak berwujud tersebut berdasarkan Fair value of the intangible assets was based on a
laporan penilaian dari penilai independen. Penilaian valuation report prepared by an independent
- 122 -
Page 127
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31,
2023 DAN UNTUK PERIODE SEMBILAN BULAN YANG 2023 AND FOR THE NINE-MONTH PERIODS ENDED
BERAKHIR PADA TANGGAL 30 SEPTEMBER 2024 DAN 2023 SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(TIDAK DIAUDIT) (Lanjutan) (Continued)
menggunakan pendekatan pendapatan dengan appraiser. The valuation is based on income approach
metode Kelebihan Pendapatan. with Excess Earnings method.
Dengan pertimbangan bahwa aset batubara di MEA In the view that its coal assets in MEA project are not
saat ini tidak akan dapat memberikan hasil yang economically viable at the current coal market
menguntungkan pada kondisi pasar batubara saat ini, condition, management of IIR has decided to provide
manajemen IIR memutuskan untuk melakukan full provision for impairment on those assets at end of
pencadangan atas penurunan nilai aset tersebut pada 2015 amounting to US$ 30,211,797.
akhir tahun 2015 sebesar US$ 30.211.797.
Sejak ditandatanganinya PPJB terkait dengan Since the signing of CSPA related to sale of IIR’s
penjualan saham IIR di MEA (Catatan 14), seluruh shares in MEA (Note 14), all assets related to MEA was
aset sehubungan dengan MEA direklasifikasi dan reclassified and presented as part of non-current
disajikan sebagai bagian dari aset tidak lancar assets held for sale.
tersedia untuk dijual.
Masmindo Masmindo
Aset tidak berwujud ini (hak tambang) berasal dari The intangible assets (mining rights) resulted from
akuisisi Masmindo yang bergerak di bidang the acquisition of Masmindo, a company engaged in
pertambangan emas dengan wilayah PKP2B yang the business of gold mining activities with CCoW area
terletak di Sulawesi Selatan. located in the South Sulawesi.
Nilai wajar aset tidak berwujud tersebut berdasarkan Fair value of the intangible assets was based on a
laporan penilaian dari penilai independen. Penilaian valuation report prepared by an independent
menggunakan pendekatan pendapatan dengan appraiser. The valuation is based on income approach
metode Arus Kas Diskonto Greenfield. using Greenfield Discounted Cashflow method.
TMK TMK
Aset tidak berwujud ini berupa Hak Pemanfaatan The intangible assets is in the form of Forest
Hutan yang berasal dari akuisisi TMK yang bergerak Utilization Rights resulted from the acquisition of TMK,
di bidang pengusahaan hutan dengan luas lahan a company engaged in the business of forest
82.805 Ha yang berada di Kalimantan Timur. exploitation with total area of 82,805 Ha located in
East Kalimantan.
Nilai wajar aset tidak berwujud tersebut berdasarkan Fair value of the intangible assets was based on a
laporan penilaian dari penilai independen. Penilaian valuation report prepared by an independent
menggunakan pendekatan pendapatan dengan appraiser. The valuation is based on income approach
metode Kelebihan Pendapatan Beberapa Periode. using Multiple Period Excess Earnings method.
Aset tak berwujud akan diamortisasi selama estimasi The intangible asset will be amortized over the
masa manfaat 24 tahun. estimated useful life of 24 years.
JBP JBP
Aset tidak berwujud ini berupa Hak Pemanfaatan The intangible assets is in the form of Forest
Hutan yang berasal dari akuisisi JBP yang bergerak di Utilization Rights resulted from the acquisition of JBP,
bidang pengusahaan hutan dengan luas lahan 23.590 a company engaged in the business of forest
Ha yang berada di Kalimantan Timur. exploitation with total area of 23,590 Ha located in
East Kalimantan.
Nilai wajar aset tidak berwujud tersebut berdasarkan Fair value of the intangible assets was based on a
laporan penilaian dari penilai independen. Penilaian valuation report prepared by an independent
menggunakan pendekatan pendapatan dengan appraiser. The valuation is based on income approach
metode Kelebihan Pendapatan Beberapa Periode. using Multiple Period Excess Earnings method.
Aset tak berwujud akan diamortisasi selama estimasi The intangible asset will be amortized over the
masa manfaat 30 tahun. estimated useful life of 30 years.
DPP DPP
Aset tidak berwujud ini berupa Hak Pemanfaatan The intangible assets is in the form of Forest
Hutan yang berasal dari akuisisi DPP yang bergerak di Utilization Rights resulted from the acquisition of DPP,
bidang pengusahaan hutan dengan luas lahan 29.485 a company engaged in the business of forest
Ha yang berada di Kalimantan Timur. exploitation with total area of 29,485 Ha located in
East Kalimantan.
Nilai wajar aset tidak berwujud tersebut berdasarkan Fair value of the intangible assets was based on a
laporan penilaian dari penilai independen. Penilaian valuation report prepared by an independent
- 123 -
Page 128
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31,
2023 DAN UNTUK PERIODE SEMBILAN BULAN YANG 2023 AND FOR THE NINE-MONTH PERIODS ENDED
BERAKHIR PADA TANGGAL 30 SEPTEMBER 2024 DAN 2023 SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(TIDAK DIAUDIT) (Lanjutan) (Continued)
menggunakan pendekatan pendapatan dengan appraiser. The valuation is based on income approach
metode Kelebihan Pendapatan Beberapa Periode. using Multiple Period Excess Earnings method.
Aset tak berwujud akan diamortisasi selama estimasi The intangible asset will be amortized over the
masa manfaat 30 tahun. estimated useful life of 30 years.
TCG TCG
Aset tidak berwujud ini berupa Hak Pemanfaatan The intangible assets is in the form of Forest
Hutan yang berasal dari akuisisi TCG yang bergerak Utilization Rights resulted from the acquisition of TCG,
di bidang pengusahaan hutan dengan luas lahan a company engaged in the business of forest
24.287 Ha yang berada di Kalimantan Timur. exploitation with total area of 24,287 Ha located in
East Kalimantan.
Nilai wajar aset tidak berwujud tersebut berdasarkan Fair value of the intangible assets was based on a
laporan penilaian dari penilai independen. Penilaian valuation report prepared by an independent
menggunakan pendekatan pendapatan dengan appraiser. The valuation is based on income approach
metode Kelebihan Pendapatan Beberapa Periode. using Multiple Period Excess Earnings method.
Aset tak berwujud akan diamortisasi selama estimasi The intangible asset will be amortized over the
masa manfaat 28 tahun. estimated useful life of 28 years.
Dengan rencana manajemen IMP untuk menjual With the intention of management of IMP to sell its
kepemilikannya di TCG (Catatan 14), manajemen IMP ownership in TCG (Note 14), management of IMP has
telah melakukan pencadangan penurunan nilai atas provided impairment provision on intangible assets
aset tidak berwujud terkait TCG sebesar US$ 853.758 related to TCG of US$ 853,758 as of September 30,
pada tanggal 30 September 2024. 2024.
NAN NAN
Aset tidak berwujud ini berasal dari akuisisi NAN, The intangible assets resulted from acquisition of
perusahaan yang bergerak di bidang industri NAN, a company engaged in the processing business
pengolahan minyak atsiri dan bahan aroma kimia industry of essential oil and aroma chemical located
yang berlokasi di Solo Sragen - Jawa Tengah dan in Solo Sragen - Central Java and pertain to its
terkait dengan database pelanggan NAN. customer database.
Penilaian aset tidak berwujud ini masih dalam tahap The valuation of such intangible assets is still
awal karena manajemen IMP masih dalam tahap preliminary as management of IMP is still fixing the
menetapkan akuntansi awal dan penentuan nilai initial accounting and determination of fair value of
wajar aset bersih NAN yang diakusisi. the identifiable net assets acquired of NAN.
PT Perkasa Investama Mineral (PIM) PT Perkasa Investama Mineral (PIM)
Aset tidak berwujud ini (hak tambang) berasal dari The intangible assets (mining rights) resulted from
akuisisi PIM yang memiliki dua entitas anak, yaitu the acquisition of PIM, which has two subsidiaries,
PT Mekko Metal Mining (MMM) dan PT Perkasa namely PT Mekko Metal Mining (MMM) and PT Perkasa
Alumina Indonesia. Hak tambang ini merupakan ijin Alumina Indonesia. Such mining rights refer to
usaha pertambangan bauksit yang dimiliki oleh MMM, bauxite mining license owned by MMM, located in
yang terletak di Kalimantan Barat dan berlaku sampai West Kalimantan and is valid until May 2032.
dengan Mei 2032.
Nilai wajar aset tidak berwujud tersebut berdasarkan Fair value of the intangible assets was based on a
laporan penilaian dari penilai independen. Penilaian valuation report prepared by an independent
menggunakan pendekatan pendapatan dengan appraiser. The valuation is based on income approach
metode Kelebihan Pendapatan Beberapa Periode. using Multiple Period Excess Earnings method.
PT Bioneer Indika Group (BIG) PT Bioneer Indika Group (BIG)
Aset tidak berwujud terkait dengan perjanjian The intangible asset pertains to exclusive distribution
distribusi eksklusif untuk penjualan produk molecular agreement related to sales of diagnostic molecular
diagnostic yang diberikan oleh Bioneer Corporation products, provided by Bioneer Corporation as non-
dalam rangka setoran modal non tunai pada cash capital injection in PT Bioneer Indika Group.
PT Bioneer Indika Group.
Nilai wajar aset tidak berwujud tersebut berdasarkan Fair value of the intangible assets was based on a
laporan penilaian dari penilai independen. Penilaian valuation report prepared by an independent
- 124 -
Page 129
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31,
2023 DAN UNTUK PERIODE SEMBILAN BULAN YANG 2023 AND FOR THE NINE-MONTH PERIODS ENDED
BERAKHIR PADA TANGGAL 30 SEPTEMBER 2024 DAN 2023 SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(TIDAK DIAUDIT) (Lanjutan) (Continued)
menggunakan pendekatan pendapatan dengan appraiser. The valuation is based on income approach
metode Kelebihan Pendapatan Beberapa Periode. using Multiple Period Excess Earnings.
Aset tak berwujud akan diamortisasi selama estimasi The intangible asset will be amortized over the
masa manfaat 10 tahun. estimated useful life of 10 years.
PT Energi Makmur Buana (EMB) PT Energi Makmur Buana (EMB)
Aset tidak berwujud berasal dari akuisisi EMB dan The intangible assets resulted from the acquisition of
terkait dengan perjanjian distributor antara EMB dan EMB and was referred to distributorship agreement
pihak ketiga, dimana EMB ditunjuk sebagai distributor entered between EMB and a third party, where EMB
dari produk pihak ketiga di wilayah Republik was appointed as distributor for the third party’s
Indonesia. products in the territory of Indonesia.
Nilai wajar aset tidak berwujud tersebut berdasarkan Fair value of the intangible assets was based on a
laporan penilaian dari penilai independen. Penilaian valuation report prepared by an independent
menggunakan pendekatan pendapatan dengan appraiser. The valuation is based on income approach
metode Kelebihan Pendapatan Beberapa Periode. using Multiple Period Excess Earnings method.
Aset tak berwujud akan diamortisasi selama estimasi The intangible asset will be amortized over the
masa manfaat 5 tahun. estimated useful life of 5 years.
PT Zebra Cross Teknologi PT Zebra Cross Teknologi
Selama tahun 2022, PT Zebra Cross Teknologi telah During year 2022, PT Zebra Cross Teknologi has made
membuat cadangan penurunan nilai atas perangkat provision for impairment on its internal developed
lunak komputer yang dikembangkan secara internal software program at the amount of US$ 678,023.
sebesar US$ 678.023.
25. GOODWILL 25. GOODWILL
Akun ini merupakan selisih lebih antara biaya This account represents the excess of acquisition cost
perolehan dan bagian Perusahaan atas nilai wajar over the Company’s interest in the fair value of the
aset bersih entitas anak setelah dikurangi akumulasi net assets of subsidiaries net of accumulated
penurunan nilai. impairment.
30 September/ 31 Desember/
September 30, December 31,
2024 2023
US$ US$
Biaya Perolehan Cost
PT Kideco Jaya Agung 635.124.678 635.124.678 PT Kideco Jaya Agung
Nusantara Resources Ltd 5.777.014 5.777.014 Nusantara Resources Ltd
PT Natura Aromatik Nusantara (NAN) (Catatan 1d) 3.666.727 - PT Natura Aromatik Nusantara (NAN) (Note 1d)
PT Telaga Mas Kalimantan 3.200.930 3.200.930 PT Telaga Mas Kalimantan
PT Rockgeo Energi Nusantara 2.012.519 2.012.519 PT Rockgeo Energi Nusantara
PT Trisetia CitaGraha 1.224.188 1.224.188 PT Trisetia CitaGraha
PT Perkasa Investama Mineral 832.356 832.356 PT Perkasa Investama Mineral
PT Diva Perdana Pesona 697.384 697.384 PT Diva Perdana Pesona
PT Mekko Metal Mining 295.139 295.139 PT Mekko Metal Mining
Jumlah 652.830.935 649.164.208 Total
Kerugian penurunan nilai (Catatan 14) (1.224.188) - Impairment losses (Note 14)
Jumlah tercatat 651.606.747 649.164.208 Net carrying amount
Perubahan nilai tercatat bersih: Movement in net carrying amount:
Saldo awal 649.164.208 649.164.208 Beginning balance
Penambahan karena akuisisi NAN 3.666.727 - Addition due to acquisition of NAN
Kerugian penurunan nilai (Catatan 14) (1.224.188) - Impairment losses (Note 14)
Saldo akhir 651.606.747 649.164.208 Ending balance
- 125 -
Page 130
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31,
2023 DAN UNTUK PERIODE SEMBILAN BULAN YANG 2023 AND FOR THE NINE-MONTH PERIODS ENDED
BERAKHIR PADA TANGGAL 30 SEPTEMBER 2024 DAN 2023 SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(TIDAK DIAUDIT) (Lanjutan) (Continued)
Sesuai dengan kebijakan akuntansi Grup, goodwill In accordance with the Group’s accounting policy,
diuji penurunan nilainya secara tahunan goodwill is tested for impairment annually (Note 3u).
(Catatan 3u). Untuk tujuan pengujian penurunan For the purpose of assessing impairment, assets are
nilai, aset dikelompokkan hingga unit terkecil yang grouped at the lowest level for which there are
menghasilkan arus kas terpisah (UPK). separately identifiable cash flows (CGU).
Grup menggunakan pendekatan pendapatan untuk The Group used an income approach to assess the
menguji penurunan nilai UPK tertentu. Pendekatan impairment value of certain CGU. The income
pendapatan didasarkan atas nilai arus kas masa approach is predicated upon the value of the future
depan yang akan dihasilkan oleh suatu bisnis cash flows that a business will generate going forward
berdasarkan masing-masing UPK izin tambang. based on the respective CGU’s mining license. The
Metode Diskonto Arus Kas meliputi proyeksi arus kas Discounted Cash Flow method was used which
dan mendiskontokannya menjadi nilai kini. Proses involves projecting cash flows and converting them to
pendiskontoan menggunakan tingkat pengembalian a present value equivalent through discounting. The
yang sesuai dengan risiko terkait dengan bisnis atau discounting process uses a rate of return that is
aset dan nilai waktu uang sebesar 10,05% pada tahun commensurate with the risk associated with the
2024 (2023: 10,05%). business or asset and the time value of money of
10.05% in 2024 (2023: 10.05%).
Per tanggal 30 September 2024, setiap kemungkinan As of September 30, 2024, any reasonably possible
perubahan yang wajar pada tingkat diskonto dan change to the discount rate and revenue growth
pertumbuhan pendapatan yang diterapkan pada applied to the value-in-use calculation is not likely to
perhitungan value-in-use, kemungkinan besar tidak cause the recoverable amount of goodwill on the
akan membuat jumlah terpulihkan goodwill atas acquisition of KJA to be below the carrying amount.
akuisisi KJA menjadi di bawah nilai tercatat. Setelah Upon completion of the impairment assessment,
penilaian penurunan nilai selesai, manajemen telah management has concluded that there is adequate
menyimpulkan bahwa terdapat ruang yang cukup. headroom.
Dengan rencana manajemen IMP untuk menjual With the intention of management of IMP to sell its
kepemilikannya di TCG (Catatan 14), manajemen IMP ownership in TCG (Note 14), management of IMP has
telah melakukan pencadangan penurunan nilai atas provided impairment provision on goodwill related to
goodwill terkait TCG sebesar US$1.224.188 pada TCG of US$1,224,188 as of September 30, 2024.
tanggal 30 September 2024.
26. INSTRUMEN KEUANGAN DERIVATIF 26. DERIVATIVE FINANCIAL INSTRUMENTS
Swap Suku Bunga Interest Rate Swap
Perusahaan melakukan perjanjian swap suku bunga The Company has entered into interest swap
(IRS) dengan PT Bank Mandiri (Persero) Tbk dan agreements (IRS) with PT Bank Mandiri (Persero) Tbk
Standard Chartered Bank cabang Jakarta atas and Standard Chartered Bank Jakarta Branch on a
sebagian utangnya untuk mengurangi dampak portion of its debt to reduce the impact of changes in
perubahan suku bunga atas pinjaman sindikasi yang interest rates on its floating rate syndicated loans
dikenakan suku bunga mengambang (Catatan 31). (Note 31).
Dalam perjanjian swap suku bunga, Perusahaan Under the interest rate swap contracts, the Company
menyetujui untuk menukar selisih antara jumlah suku agrees to exchange the differences between fixed and
bunga tetap dan mengambang dihitung dengan floating rate interest amounts calculated on agreed
jumlah pokok nosional yang disetujui. Jangka waktu notional principal amounts. The terms of the swap
perjanjian swap sesuai dengan jangka waktu utang. agreements match the terms of the underlying debt.
Eksposur terhadap risiko kredit pihak lawan Exposure to counterparty credit risk is considered low
(counterparty) dianggap rendah karena perjanjian ini because these agreements have been entered into
dibuat dengan lembaga keuangan terpercaya dengan with major creditworthy institutions with strong credit
peringkat kredit yang kuat yang diharapkan ratings, and they are expected to perform fully under
memenuhi ketentuan sesuai dengan perjanjian. the terms of the agreements.
Estimasi nilai wajar aset derivatif Perusahaan yang The estimated fair values of the Company’s derivative
ditetapkan dan efektif sebagai instrumen lindung nilai assets designated and effective as hedging
yang dicatat pada nilai wajar adalah sebagai berikut: instruments carried at fair value are summarized
below:
- 126 -
Page 131
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31,
2023 DAN UNTUK PERIODE SEMBILAN BULAN YANG 2023 AND FOR THE NINE-MONTH PERIODS ENDED
BERAKHIR PADA TANGGAL 30 SEPTEMBER 2024 DAN 2023 SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(TIDAK DIAUDIT) (Lanjutan) (Continued)
31 Desember/December 31, 2023
Jumlah nosional/ Nilai wajar/
Total notional Fair value
US$ US$
Swap suku bunga Interest rate swap
PT Bank Mandiri (Persero) Tbk 28.500.000 410.054 PT Bank Mandiri (Persero) Tbk
Standard Chartered Bank, cabang Jakarta 16.500.000 279.134 Standard Chartered Bank, Jakarta branch
Jumlah nilai wajar 45.000.000 689.188 Total fair value
Disajikan dalam laporan posisi Presented in the consolidated financial
keuangan konsolidasian sebagai berikut: position as:
Aset lancar 689.188 Current assets
Bersih 689.188 Net
Pada tanggal 30 September 2024, Perusahaan sudah As of September 30, 2024, the Company has fully
menyelesaikan seluruh utang sindikasi yang paid all outstanding syndicated loans to which interest
dilindungnilai oleh swap suku bunga (IRS), sehingga rate swap (IRS) was entered and alligned to, hence
tidak terdapat aset atau liabilitas derivatif yang diakui no derivative assets or liabilities was recognized by
oleh Perusahaan sejak itu. the Company since then.
- 127 -
Page 132
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
27. PINJAMAN JANGKA PENDEK 27. SHORT-TERM LOANS
30 September/ 31 Desember/
September 30, December 31,
2024 2023
US$ US$
Utang bank Bank loans
Rupiah Rupiah
PT Bank Mandiri (Persero) Tbk, PT Bank Mandiri (Persero) Tbk,
Cabang Jakarta 17.483.289 21.903.404 Jakarta branch
PT Bank OCBC NISP Tbk 1.413.309 392.184 PT Bank OCBC NISP Tbk
Standard Chartered Bank, cabang Standard Chartered Bank, Jakarta
Jakarta 356.508 274.787 branch
Dollar Amerika Serikat U.S. Dollar
Citibank, N.A. 20.000.000 - Citibank, N.A.
Standard Chartered Bank, cabang Standard Chartered Bank,
Jakarta 26.800.000 3.872.042 Jakarta branch
PT Bank Central Asia Tbk 3.016.958 - PT Bank Central Asia Tbk
PT Bank KB Bukopin Tbk 1.631.551 1.703.186 PT Bank KB Bukopin Tbk
PT Bank Mandiri (Persero) Tbk, PT Bank Mandiri (Persero) Tbk,
Cabang Jakarta - 29.942.969 Jakarta branch
Yuan Renminbi Yuan Renminbi
Standard Chartered Bank, cabang Standard Chartered Bank,
Jakarta 285.207 - Jakarta branch
Subjumlah 70.986.822 58.088.572 Subtotal
Bunga masih harus dibayar 116.926 320.641 Accrued interest
Jumlah 71.103.748 58.409.213 Total
Utang Bank Bank Loans
Rincian fasilitas pinjaman diatas adalah sebagai Details of the above facilities are as follows:
berikut:
Fasilitas Tingkat bunga
Jenis fasilitas/ maksimum/ Tanggal per tahun/ 30 September/ 31 Desember/
Kreditur/ Entitas/ Type of Mata Uang/ Maximum Tanggal perjanjian/ jatuh tempo/ Interest rate September 30, December 31,
Creditors Entities facilities Currency facility Agreement date Maturity date per annum 2024 2023
US$ US$
PT Bank Mandiri (Persero) Tbk, Perusahaan Kredit modal kerja/ US$ 50.000.000 10 Oktober/ 12 Juni 2024 - 13 Agustus 2024/ SOFR 1 bulan - 29.942.969
Cabang Jakarta/ Jakarta branch Working capital loan October 10, 2023 June 12, 2024 - August 13, 2024 + 1,5% + 0,26161%/
SOFR 1 month
+ 1.5% + 0.26161%
TPEC Kredit modal kerja/ US$ 28.400.000 2 November/ 13 November 2025/ JIBOR 1 bulan + 4%/ 17.483.289 17.475.350
Working capital loan November 2, 2022 November 13, 2025 JIBOR 1 month + 4%
TPE Pinjaman berjangka/ Rp 99.000.000.000 22 September/ 23 September 2024/ JIBOR 3 bulan + 4,55%/ - 4.428.054
Term loan September 22, 2022 September 23, 2024 JIBOR 3 months + 4.55%
Standard Chartered Bank, cabang Perusahaan Short-term loan US$ 25.000.000 24 Juli/ 31 Maret 2025/ Cost of fund + 1,5%/ 25.000.000 -
Jakarta/ Jakarta branch
July 24, 2024 March 31, 2025 Cost of fund + 1.5%
EMI Pinjaman Jangka Pendek/ US$ 10.000.000 7 November/ 1 Juli 2024 - 9 Oktober 2024/ Cost of fund + 2,35%/ 1.800.000 2.830.000
Short-term Loans November 7, 2023 July 1, 2024 - October 9, 2024 Cost of fund + 2.35%
Rp 25 Juni 2024/ 25 Oktober 2024/ Cost of fund + 2,35%/ 356.508 274.787
June 25, 2024 October 25, 2024 Cost of fund + 2.35%
CNY 8 Agustus 2024/ 6 Desember 2024/ Cost of fund + 2,35%/ 285.207 -
August 8, 2024 December 6, 2024 Cost of fund + 2.35%
Pembiayaan faktur impor/ US$ 10.000.000 2 November/ 4 Januari 2024 - 28 Maret 2024/ Cost of fund + 2%/ - 1.042.042
Import invoice financing November 2, 2022 January 4, 2024 - March 28, 2024 Cost of fund + 2%
Citibank, N.A. KJA Fasilitas kredit revolving/ US$ 20.000.000 11 Mei/ 27 Desember 2024/ LIBOR + 1,75% 20.000.000 -
Revolving credit facilities May 11, 2020 December 27, 2024
PT Bank KB Bukopin Tbk EMB Uncomitted LC atau SKBDN/ US$ 20.000.000 2 Oktober/ 2 Oktober/ SOFR + 3% 1.631.551 1.703.186
Uncomitted LC or SKBDN October 2, 2023 October 2, 2024
PT Bank OCBC NISP Tbk XTI Uncomitted demand loan / Rp 35.000.000.000 17 Oktober/ 16 Oktober 2024 - April 2025 8% 1.413.309 392.184
Uncomitted demand loan October 17, 2023 October 16, 2024 - April 2025
PT Bank Central Asia Tbk (BCA) NAN Fasilitas kredit ekspor US$ 3.328.000 24 April 2024/ 25 Maret 2025/ 6% 2.094.000 -
Export credit facility April 24, 2024 March 25, 2025
Overdraft/ Overdraft US$ 949.991 24 April 2024/ 25 Maret 2025/ 6% 922.958 -
April 24, 2024 March 25, 2025
Jumlah pokok pinjaman/
Total principal loan 70.986.822 58.088.572
Bunga yang masih harus dibayar/
Accrued interest 116.926 320.641
Jumlah/ Total 71.103.748 58.409.213
- 128 -
Page 133
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
Perjanjian fasilitas kredit dengan PT Bank Mandiri Credit facility agreements with PT Bank Mandiri
(Persero) Tbk cabang Jakarta, PT Bank OCBC NISP (Persero) Tbk Jakarta branch, PT Bank OCBC NISP
Tbk, PT Bank KB Bukopin Tbk dan BCA mencakup Tbk, PT Bank KB Bukopin Tbk and BCA contain certain
persyaratan tertentu untuk mempertahankan rasio covenants to maintain financial ratios
keuangan ( Catatan 54). Pada tanggal 30 September (Note 54). As of September 30, 2024 and December
2024 dan 31 Desember 2023, Perusahaan dan 31, 2023, the Company and relevant subsidiaries
beberapa entitas anak terkait telah memenuhi have complied with these covenants.
persyaratan tersebut.
28. UTANG USAHA 28. TRADE ACCOUNTS PAYABLE
30 September/ 31 Desember/
September 30, December 31,
2024 2023
US$ US$
a. Berdasarkan pemasok a. By creditor
Pihak berelasi (Catatan 52) 5.138.049 4.077.079 Related parties (Note 52)
Pihak ketiga Third parties
Pemasok lokal 291.006.044 254.849.201 Local suppliers
Pemasok luar negeri 5.506.951 19.044.082 Foreign suppliers
Jumlah pihak ketiga 296.512.995 273.893.283 Total third parties
Jumlah 301.651.044 277.970.362 Total
b. Berdasarkan mata uang b. By currency
Rupiah 210.204.088 122.284.647 Rupiah
Dollar Amerika Serikat 91.402.714 155.679.841 U.S. Dollar
Euro 41.234 2.085 Euro
Dollar Australia 3.008 3.789 Australian Dollar
Jumlah 301.651.044 277.970.362 Total
Utang usaha atas jasa sub-kontraktor dan pembelian Trade accounts payable to sub-contractors and
barang dan jasa dari pihak ketiga memiliki jangka waktu purchase of goods and services transactions from
kredit antara 14 sampai dengan 60 hari. Tidak ada third parties has credit terms of 14 to 60 days.
bunga yang dibebankan pada utang usaha. No interest is charged to the trade accounts payable.
29. UTANG PAJAK 29. TAXES PAYABLE
30 September/ 31 Desember/
September 30, December 31,
2024 2023
US$ US$
Pajak kini Current tax
Entitas anak Subsidiaries
2024 (Catatan 47) 937.853 - 2024 (Note 47)
2023 367.931 2.750.889 2023
Pajak penghasilan Income tax
Pasal 4(2) 513.098 183.555 Article 4(2)
Pasal 15 189.072 186.100 Article 15
Pasal 21 1.565.631 4.066.796 Article 21
Pasal 22 10.513 9.366 Article 22
Pasal 23 1.434.065 1.061.181 Article 23
Pasal 25 1.000.000 578.431 Article 25
Pasal 26 1.870.321 1.457.421 Article 26
Pajak pertambahan nilai 7.179.993 5.224.965 Value added tax
Jumlah 15.068.477 15.518.704 Total
- 129 -
Page 134
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
30. UTANG LAIN-LAIN KEPADA PIHAK KETIGA DAN 30. OTHER ACCOUNTS PAYABLE TO THIRD PARTIES
BIAYA MASIH HARUS DIBAYAR AND ACCRUED EXPENSES
30 September/ 31 Desember/
September 30, December 31,
2024 2023
US$ US$
Biaya konstruksi dan sub-kontraktor 27.191.795 25.385.804 Construction and sub-contractors expenses
Pengapalan dan transportasi 15.111.335 14.760.865 Shipping and transportation
PNBP bagian pemerintah pusat dan daerah 13.151.380 27.017.740 PNBP for central and local government's share
Gaji, insentif, dan bonus karyawan 11.734.851 17.373.806 Salaries, employees' incentives and bonus
Utang royalti kepada pemerintah 7.653.567 43.811.037 Royalty payable to government
Perbaikan dan pemeliharaan 7.283.715 7.871.466 Repair and maintenance
Kewajiban rehabilitasi Daerah Aliran Watershed/ Daerah Aliran Sungai (“DAS”)
Sungai ("DAS") 5.400.000 10.030.000 rehabilitation obligation
Lain-lain (masing-masing dibawah
US$ 5 juta) 43.088.377 40.223.126 Others (each below US$ 5 million)
Jumlah 130.615.020 186.473.844 Total
31. PINJAMAN JANGKA PANJANG 31. LONG-TERM LOANS
30 September/ 31 Desember/
September 30, December 31,
2024 2023
US$ US$
Pihak berelasi (Catatan 52) 1.294.782 1.253.300 Related party (Note 52)
Pihak ketiga Third parties
Utang bank Bank loans
Dollar Amerika Serikat U.S. Dollar
Pinjaman Sindikasi 457.495.140 107.000.000 Syndicated Loans
PT Bank DBS Indonesia 52.350.000 59.225.000 PT Bank DBS Indonesia
PT Bank Central Asia Tbk 11.597 - PT Bank Central Asia Tbk
Jumlah 509.856.737 166.225.000 Total
Biaya yang belum diamortisasi (3.794.349) (3.878.400) Unamortized cost
Bunga masih harus dibayar 256.931 226.195 Accrued interest
Jumlah 506.319.319 162.572.795 Total
Dikurangi bagian yang jatuh tempo
dalam satu tahun (46.408.668) (58.297.225) Less current maturities
Pinjaman jangka panjang - bersih 459.910.651 104.275.570 Long-term loans - net
Jadwal pembayaran pokok pinjaman Schedule of principal repayment
Pada tahun pertama 46.156.597 59.015.000 In the first year
Pada tahun kedua 112.077.640 20.900.000 In the second year
Pada tahun ketiga dan seterusnya 351.622.500 86.310.000 In the third year and onwards
Jumlah 509.856.737 166.225.000 Total
Tingkat suku bunga per tahun Interest rates per annum
Dollar Amerika Serikat 5,5% - 7,89% 5,75% - 7,89% U.S. Dollar
- 130 -
Page 135
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
Rincian fasilitas pinjaman jangka panjang adalah Details of long-term loan facilities are as follows:
sebagai berikut:
Tanggal
jatuh tempo Tingkat bunga
fasilitas/ per tahun/ 30 September/ 31 Desember/
Nama kreditur/ Entitas/ Jenis fasilitas/ Fasilitas maksimum/ Tanggal perjanjian/ Maturity date Interest rate September 30, December 31,
Name of creditors Entities Type of facility Maximum facility Agreement date of facility per annum 2024 2023
US$ US$ US$
Pinjaman Sindikasi Perusahaan Kredit pembiayaan/ 300.000.000 29 April/ 31 Desember 2028/ SOFR 3 bulan + 1,55/ 295.500.000 -
Financing credit April 29, 2024 December 31, 2028 SOFR 3 months + 1.55%
Perusahaan Kredit pembiayaan/ 250.000.000 2 Maret 2023/ 2 Maret 2028/ SOFR + (2,25%-2,5%)/ 161.995.140 62.000.000
Financing credit March 2, 2023 March 2, 2028 SOFR + (2.25%-2.5%)
Perusahaan Kredit pembiayaan/ 150.000.000 17 Juli/ 30 Juni/ SOFR 3 bulan + 1,67% - 45.000.000
July 17, 2019 June 30, 2024 - 1,85% + 0,26161%/
SOFR 3 months + 1.67%
- 1.85% + 0.26161%
PT Bank DBS Indonesia KGTE Kredit pembiayaan/ 50.000.000 20 September/ 28 Maret/ SOFR 3 bulan + 1,3%/ 37.100.000 46.725.000
Financing credit September 20, 2023 March 28, 2027 SOFR 3 months + 1.3%
JBP Fasilitas pengeluaran 22.500.000 18 April/ 18 April/ SOFR + 2,25%/ 15.250.000 12.500.000
modal (amortizing
April 18, 2022 April 18, 2027 SOFR + 2.25%
term loan )/
Capital expenditure
facility (amortizing
term loan)
PT Bank Central Asia Tbk NAN Installment loan/ 185.597 24 April/ 25 Maret/ 6%/ 11.597 -
Installment loan April 24, 2024 March 25, 2025 6%
Subtotal 509.856.737 166.225.000
Biaya yang belum diamortisasi/
Unamortized cost (3.794.349) (3.878.400)
Bunga yang masih harus dibayar/
Accrued interest 256.931 226.195
Jumlah/ Total 506.319.319 162.572.795
Pinjaman Sindikasi Syndicated Loans
Fasilitas US$ 300.000.000 US$ 300,000,000 facility
Pada tahun 2023, Perusahaan memperoleh fasilitas In 2023, the Company obtained US$ 300,000,000
kredit sebesar US$300,000.000 dari PT Bank Negara credit facility from PT Bank Negara Indonesia
Indonesia (Persero) Tbk (“BNI”) and PT Bank Mandiri (Persero) Tbk (“BNI”) and PT Bank Mandiri (Persero)
(Persero) Tbk. ("Mandiri") (Catatan 54). Pada tanggal Tbk. ("Mandiri") (Note 54). On April 29, 2024, the
29 April 2024, Perusahaan melakukan penarikan atas Company has made full drawdown of the provided
keseluruhan fasilitas yang disediakan, dimana dana facility, which proceeds were used to pay all the
tersebut digunakan untuk melunasi seluruh utang outstanding bonds obligation due in 2024 (Note 34).
obligasi yang jatuh tempo pada tahun 2024 (Catatan The loan will be repaid on installment basis, based on
34). Utang bank akan dicicil sesuai dengan payment schedule as agreed in the loan facility. The
pembayaran yang telah disepakati dalam fasilitas credit facility agreement contains certain covenants to
pinjaman. Perjanjian fasilitas kredit mencakup maintain financial ratios. As of
persyaratan tertentu untuk mempertahankan rasio September 30, 2024, the Company has complied with
keuangan. Pada tanggal 30 September 2024, these covenants.
Perusahaan telah memenuhi persyaratan tersebut
Fasilitas US$ 250.000.000 US$ 250,000,000 facility
Pada tahun 2023, Perusahaan memperoleh fasilitas In 2023, the Company obtained US$ 250,000,000
kredit sebesar US$250,000.000 dari PT Bank Mandiri credit facility from PT Bank Mandiri (Persero) Tbk.
(Persero) Tbk. (“Bank Mandiri”), PT Bank Negara (“Bank Mandiri”), PT Bank Negara Indonesia (Persero)
Indonesia (Persero) Tbk. (“Bank BNI”), PT Bank UOB Tbk. (“Bank BNI”), PT Bank UOB Indonesia (“UOB”),
Indonesia (“UOB”), PT Bank DBS Indonesia (“DBS”) PT Bank DBS Indonesia (“DBS”) and PT Bank KB
and PT Bank KB Bukopin Tbk. (“KB Bukopin”) Bukopin Tbk. (“KB Bukopin”) (Note 54). As of
(Catatan 54). Pada tanggal 30 September 2024, September 30, 2024, the Company has drawn
Perusahaan telah menarik US$162.000.000 dari US$162,000,000 from this facility. The loan will be
fasilitas ini. Utang bank akan dicicil sesuai dengan repaid on installment basis, based on payment
pembayaran yang telah disepakati dalam fasilitas schedule as agreed in the loan facility.
pinjaman.
Perjanjian fasilitas kredit mencakup persyaratan The credit facility agreement contains certain
tertentu untuk mempertahankan rasio keuangan. covenants to maintain financial ratios. As of
Pada tanggal 30 September 2024 dan 31 Desember September 30, 2024 and December 31, 2023, the
2023, Perusahaan telah memenuhi persyaratan Company has complied with these covenants.
tersebut.
- 131 -
Page 136
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
Fasilitas US$ 150.000.000 US$ 150,000,000 facility
Pada tahun 2019, Perusahaan telah menarik seluruh In 2019, the Company made a full drawndown from
pinjaman dari fasilitas US$ 150.000.000 yang its US$ 150,000,000 facility provided by PT Bank
diberikan oleh PT Bank Mandiri (Persero) Tbk, Mandiri (Persero) Tbk, Citibank, N.A., Jakarta and
Citibank, N.A., Jakarta and Standard Chartered Bank, Standard Chartered Bank, Singapore Branch. The loan
Cabang Singapura. Utang bank akan dicicil sesuai will be repaid on installment basis, based on payment
dengan jadwal pembayaran yang telah disepakati schedule as agreed in the loan facility.
dalam fasilitas pinjaman.
Perjanjian fasilitas kredit mencakup persyaratan The credit facility agreement contains certain
tertentu untuk mempertahankan rasio keuangan. covenants to maintain financial ratios. Loans were
Pinjaman sudah dilunasi pada tanggal 28 Juni 2024. fully settled on June 28, 2024.
PT Bank DBS Indonesia PT Bank DBS Indonesia
Fasilitas US$ 50.000.000 US$ 50,000,000 facility
Pada tanggal 20 September 2023, KGTE On September 20, 2023, KGTE obtained new loan
mendapatkan fasilitas pinjaman baru dari PT Bank facility from PT Bank DBS Indonesia at the amount of
DBS Indonesia sebesar US$ 50.000.000, dimana US$ 50,000,000, which has been fully drawn
fasilitas ini telah ditarik seluruhnya pada bulan yang within the same month.
sama.
Perjanjian fasilitas kredit mencakup persyaratan The credit facility agreement contains certain
tertentu untuk mempertahankan rasio keuangan covenants to maintain financial ratios (Note 54). As of
(Catatan 54). Pada tanggal 30 September 2024 dan September 30, 2024 and December 31, 2023, KGTE
31 Desember 2023, KGTE telah memenuhi has complied with these covenants.
persyaratan tersebut.
Pada tanggal 30 September 2024, jumlah pinjaman As of September 30, 2024, total outstanding loan
adalah sebesar US$ 37.100.000 (31 Desember 2023: amounted to US$ 37,100,000 (December 31, 2023:
US$ 46.725.000). US$ 46,725,000).
Fasilitas US$ 22.500.000 US$ 22,500,000 facility
Sampai dengan tanggal 30 September 2024, JBP Up to September 30, 2024, JBP has drawdown a loan
telah menarik pinjaman sebesar US$ 15,25 juta of US$ 15.25 million (December 31, 2023: US$ 12.5
(31 Desember 2023: US$ 12,5 juta) dari fasilitas million) from credit facility of US$ 22,500,000
kredit sebesar US$ 22.500.000 yang diberikan DBS provided by DBS Bank Ltd (Note 54).
Bank Ltd (Catatan 54).
Perjanjian fasilitas kredit mencakup persyaratan The credit facility agreement contains certain
tertentu untuk mempertahankan rasio keuangan covenants to maintain financial ratios (Note 54). As of
(Catatan 54). Pada tanggal 30 September 2024 dan September 30, 2024 and December 31, 2023, JBP has
31 Desember 2023, JBP telah memenuhi persyaratan complied with these covenants.
tersebut.
PT Bank Central Asia Tbk PT Bank Central Asia Tbk
Pada tahun 2016, NAN memperoleh fasilitas kredit In 2016, NAN obtained credit facility from BCA with
dari BCA, dengan saldo terutang sebesar US$11.597 outstanding balance of US$11,597 as of September
pada tanggal 30 September 2024 (31 Desember 30, 2024 (December 31, 2023: US$ nil). The credit
2023: US$ nihil). Perjanjian fasilitas kredit mencakup facility agreement contains certain covenant to
persyaratan tertentu untuk mempertahankan rasio maintain financial ratios (Note 54). As of September
keuangan (Catatan 54). Pada tanggal 30 September 30, 2024, NAN has complied with these covenants.
2024, NAN telah memenuhi persyaratan tersebut.
Tanah dan bangunan pabrik, SHGB No. 00183/ dagen Land and factory building, SHGB No. 00183/ dagen
atas nama NAN di Jl. Solo-Sragen KM 7, Karanganyar, owned by NAN located at Jl. Solo Sragen KM 7,
Jawa Tengah dijadikan sebagai jaminan atas Karanganyar, Central Java was used as collateral to
pinjaman bank. bank loan.
- 132 -
Page 137
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
32. PINJAMAN YANG DAPAT DIKONVERSIKAN 32. CONVERTIBLE LOANS
30 September/ 31 Desember/
September 30, December 31,
2024 2023
US$ US$
Pokok pinjaman Principal loan
Pinjaman Konversi Seri A 7.500.000 7.500.000 Convertible Loan Series A
Pinjaman Konversi Seri B 22.850.000 20.350.000 Convertible Loan Series B
Subjumlah 30.350.000 27.850.000 Subtotal
Nilai wajar derivatif tertanam atas Fair value changes on embedded
pinjaman yang dapat dikonversikan (9.459.234) (9.459.234) derivative of convertible loan
Beban unwinding 1.015.474 1.701.765 Unwinding expense
Jumlah 21.906.240 20.092.531 Total
Pinjaman Konversi Seri A Convertible Loan Series A
Pada tanggal 19 Mei 2022, Perusahaan bersama- On May 19, 2022, the Company together with its
sama dengan entitas anaknya, yaitu PT Solusi subsidiaries, PT Solusi Mobilitas Indonesia (“SMI”)
Mobilitas Indonesia (“SMI”) dan PT Indika Energy and PT Indika Energy Infrastructure (“IEI”), signed a
Infrastructure (“IEI”), telah menandatangani joint investment agreement with Alpha JWC III, L.P.
perjanjian investasi bersama dengan Alpha JWC III, and/or its affiliates and Sino Key Limited (“Investor
L.P. dan/atau afiliasinya dan Sino Key Limited Series A”) for two-wheelers electric vehicle sector
(“Investor Seri A”) untuk sektor kendaraan listrik roda through investment in PT Ilectra Motor Group (“IMG”)
dua melalui investasi pada PT Ilectra Motor Group (“Proposed Transaction”).
(“IMG”) (“Rencana Transaksi”).
Sehubungan dengan Rencana Transaksi, Investor Seri With reference to the Proposed Transaction, Investor
A setuju untuk memberikan pinjaman yang dapat Series A agreed to provide a convertible loan
dikonversi senilai US$ 7.500.000 atau ekuivalen dalam amounting to US$ 7,500,000 or its equivalent in
Rupiah pada tanggal penarikan yang diajukan oleh Rupiah at the date of the drawdown by IMG to
IMG kepada Investor Seri A, sebagaimana diatur Investor Series A, as governed under the Convertible
dalam Convertible Loan Agreement yang Loan Agreement executed by and between SMI,
ditandatangani oleh dan antara SMI, Investor Seri A, Investor Series A and IMG dated May 19, 2022
dan IMG tertanggal 19 Mei 2022 (“Pinjaman Konversi (“Convertible Loan Series A”).
Seri A”).
Tanggal jatuh tempo dari perjanjian pinjaman yang The maturity date of the convertible loan agreement
dapat dikonversi ini adalah 6 tahun sejak tanggal is 6 years from the date of the convertible loan
perjanjian pinjaman yang dapat dikonversikan agreement (“Agreement”) which can be extended for
tersebut (“Perjanjian”), dan dapat diperpanjang up to 10 years from the date of the Agreement
sampai dengan 10 tahun sejak tanggal Perjanjian (“Maturity Date”).
tersebut (Tanggal Jatuh Tempo”).
Para Pihak setuju bahwa selama pinjaman masih The parties agree that in so for so long as the loan is
dalam bentuk pinjaman yang dapat dikonversikan, in the form of the convertible loan, it shall be subject
pinjaman tersebut dikenakan bunga sebesar 1% per to interest at the rate of 1% per annum, exclusive
tahun, tidak termasuk pajak. Bunga ini hanya akan from tax. Such interest shall only become due and
menjadi terutang dan jatuh tempo pada saat IMG payable when IMG is obliged to perform repayment,
diharuskan melakukan pembayaran, sebagaimana as further explained in the paragraph below.
dijelaskan lebih lanjut dalam paragraf dibawah ini.
Investor Seri A mempunyai hak untuk meminta Investor Series A have the right to demand a
pembayaran kembali Pinjaman Konversi Seri A dan repayment of the Convertible Loan Series A and a
sejumlah bunga dari IMG pada kondisi (i) pinjaman corresponding amount of interest from IMG, in the
yang dapat dikonversikan belum dikonversi pada atau event of (i) the convertible loan has not been
sebelum Tanggal Jatuh Tempo; atau (ii) setiap saat converted on or before the Maturity Date; or (ii) at
setelah peristiwa gagal bayar yang didefinisikan any time after any occurrence of event of default as
dalam Perjanjian. defined in the Agreement.
- 133 -
Page 138
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
Pinjaman Konversi Seri A yang secara keseluruhan The Convertible Loan Series A in aggregate will be
diterbitkan akan dikonversi menjadi saham yang convertible into shares representing (directly and
mewakili (baik langsung maupun tidak langsung) indirectly) 21.44% of the total issued and paid-up
sebesar 21,44% dari saham IMG yang diterbitkan dan capital of IMG on a fully diluted and as converted
disetor penuh dalam kondisi dilusi penuh dan dapat basis. The embedded conversion option was valued at
dikonversi. Opsi konversi tertanam senilai US$ 4,351,754 as of May 19, 2022 and
US$ 4.351.754 pada tanggal 19 Mei 2022 dan US$ 3,235,835 as of September 30, 2024 and
US$ 3.235.835 pada tanggal 30 September 2024 dan December 31, 2023. Fair value changes on embedded
31 Desember 2023. Perubahan nilai wajar derivatif derivative of convertible loan series A was recognized
tertanam atas pinjaman yang dapat dikonversikan directly in consolidated profit and loss of year 2023.
seri A diakui langsung pada laporan laba rugi
konsolidasian tahun 2023.
Penilaian kembali nilai wajar derivatif tertanam atas Reassessment of fair value of the embedded
pinjaman yang dikonversi seri A akan dilakukan pada derivative on convertible loan series A will be done as
tanggal 31 Desember 2024. of December 31, 2024.
Pinjaman Konversi Seri B Convertible Loan Series B
Pada tanggal 17 Agustus 2023, SMI dan IEI, bersama On August 17, 2023, SMI dan IEI, with the Series B
dengan Investor Seri B yaitu Alpha JWC Ventures II Investors, Alpha JWC Ventures II L.P., Sino Key
L.P., Sino Key Limited, HH-CTBC, dan Brama One Limited, HH-CTBC, and Brama One Ventures Limited
Ventures Limited menandatangani perjanjian entered into additional joint investment agreement or
penambahan investasi atau disebut dengan Perjanjian referred to as Convertible Loan Agreement Series B.
Pinjaman Konversi Seri B. Investor Utama Seri B ini The Lead Investor for Series B is Sino Key Limited.
adalah Sino Key Limited.
Perjanjian ini terkait dengan penambahan pinjaman This Agreement related to additional convertible loan,
sebesar US$ 20.350.000 dengan tingkat bunga 1% amounting to US$ 20,350,000, bearing interest rate
per tahun, tidak termasuk pajak (“Pinjaman Konversi of 1% per annum, excluding tax (“Convertible Loan
Seri B”). Tanggal jatuh tempo perjanjian investasi Series B”). The maturity date of the convertible loan
yang dapat dikonversi ini adalah 19 Mei 2028, dan agreement is May 19, 2028 and can be extended by
dapat diperpanjang oleh Investor Seri B sampai Investor Series B until unspecified date or before
dengan tanggal yang tidak ditentukan atau sebelum May 19, 2032.
tanggal 19 Mei 2032.
Para Pihak setuju bahwa selama pinjaman masih The parties agree that in so for so long as the loan is
dalam bentuk pinjaman yang dapat dikonversikan, in the form of the convertible loan, it shall be subject
pinjaman tersebut dikenakan bunga sebesar 1% per to interest at the rate of 1% per annum, exclusive
tahun, tidak termasuk pajak. Bunga ini hanya akan from tax. Such interest shall only become due and
menjadi terutang dan jatuh tempo pada saat IMG payable when IMG is obliged to perform repayment,
diharuskan melakukan pembayaran, sebagaimana as further explained in the paragraph below.
dijelaskan lebih lanjut dalam paragraf dibawah ini.
Investor Seri B mempunyai hak untuk meminta Investor Series B have the right to demand a
pembayaran kembali Pinjaman Konversi Seri B dan repayment of the Convertible Loan Series B and a
sejumlah bunga dari IMG pada kondisi (i) pinjaman corresponding amount of interest from IMG, in the
yang dapat dikonversikan belum dikonversi pada event of (i) the convertible loan has not been
tanggal jatuh tempo; atau (ii) pada saat penghentian converted on the Maturity Date; or (ii) upon
perjanjian karena peristiwa gagal bayar sebagaimana termination of the agreement following to event of
diatur dalam perjanjian. default as governed under the agreement.
Pada tanggal 28 Agustus 2023, pemegang saham dan On August 28, 2023, the shareholder and Investor
Investor Seri A dan Investor Seri B menandatangani Series A and Investor Series B entered into Amended
Perjanjian Investasi yang Diubah dan Dinyatakan and Restated Investment Agreement that combined
Kembali yang berisi penggabungan antara Penjanjian both Convertible Loan Series A and Convertible Loan
Pinjaman Konversi Seri A dan Pinjaman Konversi Seri Series B Agreement, therefore after the amendment,
B, sehingga dalam perjanjian tersebut menyebutkan total transaction value was US$ 27,850,000 or its
bahwa jumlah keseluruhan nilai transaksi sebesar equivalent in Rupiah determined based on withdrawal
US$ 27.850.000 (“Jumlah Pinjaman”) atau setara date submitted by the Group to Investors (“Total
dalam Rupiah sesuai dengan tanggal penarikan yang Loan”). Total Loan will be convertible into shares
diajukan oleh Grup kepada Investor. Jumlah Pinjaman representing (directly and indirectly) 62.50% of the
akan dikonversi menjadi saham yang mewakili (baik total issued and paid-up capital of IMG on a fully
langsung maupun tidak langsung) sebesar 62,50% diluted and as converted basis.
dari saham IMG yang diterbitkan dan disetor penuh
dalam kondisi dilusi penuh dan dapat dikonversi.
- 134 -
Page 139
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
Opsi konversi tertanam senilai US$ 5.107.480 pada The embedded conversion option was valued at
tanggal 28 Agustus 2023 dan US$ 4.873.840 pada US$ 5,107,480 as of August 28, 2023 and
tanggal 30 September 2024 dan 31 Desember 2023. US$ 4,873,840 as of September 30, 2024 and
Perubahan nilai wajar derivatif tertanam atas December 31, 2023. Fair value changes on embedded
pinjaman yang dapat dikonversikan seri B diakui derivative of convertible loan series B was recognized
langsung pada laporan laba rugi konsolidasian tahun directly in consolidated profit and loss of year 2023.
2023.
Penilaian kembali nilai wajar derivatif tertanam atas Reassessment of fair value of the embedded
pinjaman yang dikonversi seri B akan dilakukan pada derivative on convertible loan series B will be done as
tanggal 31 Desember 2024. of December 31, 2024.
Pada tanggal 26 Januari 2024, IMG telah On January 26, 2024, IMG had signed Convertible
menandatangani Perjanjian Pinjaman Konversi Loan Agreement with PT Zeze Ajuwel Tambang (“PT
dengan PT Zeze Ajuwel Tambang (“PT ZAT”) sebesar ZAT”) amounting to US$ 2,500,000. This convertible
US$ 2.500.000. Perjanjian pinjaman konversi ini loan agreement is a continuation of the Convertible
merupakan kelanjutan dari Pinjaman Konversi Seri B Loan Series B and has the same terms with the
dan memiliki ketentuan yang sama dengan Pinjaman Convertible Loan Series B.
Konversi Seri B.
Tanggal jatuh tempo untuk perjanjian pinjaman ini The maturity date of the convertible loan agreement
adalah 19 Mei 2028 dan dapat diperpanjang sampai is May 19, 2028 and can be extended until unspecified
dengan tanggal yang tidak ditentukan atau sebelum date or before May 19, 2032. The loan of PT ZAT will
tanggal 19 Mei 2032. Pinjaman dari PT ZAT ini akan be convertible into shares representing (directly and
dikonversi menjadi saham yang mewakili (baik indirectly) 1.9% of the total issued and paid-up capital
langsung maupun tidak langsung) 1,9% dari saham of IMG on a fully diluted and as converted basis.
IMG yang diterbitkan dan disetor penuh dalam kondisi
dilusi penuh dan dapat dikonversi.
Sebagai kelanjutan penandatanganan Perjanjian Following signing of the Convertible Loan Agreement,
Pinjaman Konversi, PT ZAT juga telah PT ZAT had also signed Deed of Adherence to the
menandatangani Akta Kepatuhan atas Perjanjian Amended and Restated Investment Agreement of IMG
Investasi yang Diubah dan Dinyatakan Kembali dated August 28, 2023 (“ARIA”) on January 26, 2024.
tertanggal 28 Agustus 2023 (“ARIA”) pada tanggal 26
Januari 2024.
Penilaian opsi konversi tertanam atas tambahan Valuation of embedded conversion option for the new
pinjaman konversi seri B akan diselesaikan oleh additional convertible loan series B will be completed
manajemen IMG pada akhir 2024. by management of IMG by year-end 2024.
Pinjaman Konversi Seri B+ Series B+ Convertible Loan
Pada tanggal 14 Agustus 2024, IMG telah On 14 August 2024, IMG has signed a Convertible
menandatangani Perjanjian Pinjaman Konversi Loan Agreement with ZAT amounting to
dengan ZAT sebesar US$7.500.000. Perjanjian US$7,500,000. This convertible loan agreement is in
pinjaman konversi ini merupakan tambahan dari addition to the Series B Convertible Loan and has the
Pinjaman Konversi Seri B dan memiliki ketentuan same terms as the Series B Convertible Loan. The
yang sama dengan Pinjaman Konversi Seri B. Tanggal maturity date of the loan is 19 May 2028 and may be
jatuh tempo untuk perjanjian pinjaman ini adalah 19 extended to indefinite period or before 19 May 2032.
Mei 2028 dan dapat diperpanjang sampai dengan
tanggal yang tidak ditentukan atau sebelum tanggal
19 Mei 2032.
- 135 -
Page 140
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
33. LIABILITAS SEWA 33. LEASE LIABILITIES
30 September/ 31 Desember/
September 30, December 31,
2024 2023
US US
Analisis jatuh tempo Maturity analysis
Tahun 1 9.352.845 9.368.144 Year 1
Tahun 2 3.584.661 6.480.640 Year 2
Tahun 3 637.366 2.018.929 Year 3
Jumlah 13.574.872 17.867.713 Total
Beban keuangan ditangguhkan (360.216) (1.547.300) Deferred interest expense
Jumlah 13.214.656 16.320.413 Total
Bagian yang jatuh tempo dalam
waktu satu tahun (9.063.499) (7.870.164) Current maturities
Liabilitas sewa jangka panjang 4.151.157 8.450.249 Noncurrent lease liabilities
34. UTANG OBLIGASI 34. BONDS PAYABLE
30 September/ 31 Desember/
September 30, December 31,
2024 2023
US$ US$
Senior Notes 2029, tahun 2024 455.000.000 - Senior Notes 2029, year 2024
Senior Notes VII , tahun 2020 201.548.000 534.064.000 Senior Notes VII, year 2020
Senior Notes VI , tahun 2017 - 293.566.000 Senior Notes VI, year 2017
Biaya emisi dan diskon obligasi Unamortized bond issuance costs
yang belum diamortisasi (7.044.355) (5.284.220) and discount
Bunga yang masih harus dibayar -
jangka pendek 25.687.915 10.936.120 Accrued interest - current
Bersih 675.191.560 833.281.900 Net
Disajikan di laporan posisi keuangan Presented in consolidated statements
konsolidasian sebagai: of financial position as:
Liabilitas jangka pendek 226.157.281 304.359.120 Current liabilities
Liabilitas jangka panjang 449.034.279 528.922.780 Noncurrent liabilites
Jumlah 675.191.560 833.281.900 Total
Senior Notes 2029 Senior Notes 2029
Pada tanggal 7 Mei 2024, Perusahaan menerbitkan On May 7, 2024, the Company issued Senior Notes
Obligasi sejumlah US$ 350.000.000 (“Obligasi amounting to US$ 350,000,000 (”Notes 2029”). The
2029”). Obligasi ini akan jatuh tempo pada tanggal 7 Notes will mature on May 7, 2029 and bears interest
Mei 2029 dan dikenakan bunga sebesar 8,75% per at 8.75% per annum, payable semiannually on May 7
tahun, terutang setiap 6 bulan pada tanggal 7 Mei dan and November 7, commencing November 7, 2024.
7 November, dimulai pada tanggal 7 November 2024. The Notes are listed on the Singapore Stock
Obligasi ini tercatat di Singapore Stock Exchange. Exchange. In relation to the issuance of the Notes
Sehubungan dengan penerbitan Obligasi 2029 ini, the 2029, the Bank of New York Mellon acted as
Bank of New York Mellon bertindak sebagai “Trustee” “Trustee”, while the Company, IIC, TIME, TPE, TPEC
sedangkan Perusahaan, IIC, TIME, TPE, TPEC dan TS and TS acted as Guarantors.
menjadi pihak penjamin.
Obligasi 2029 ini dijamin dengan hak prioritas The Notes 2029 are secured on a first priority basis
pertama dengan jaminan sebagai berikut: by a lien on the following collaterals:
• Gadai atas saham-saham TPE dan TPEC yang • Pledges of TPE and TPEC’s shares owned by the
dimiliki oleh Perusahaan, TIME dan IIC; Company, TIME and IIC;
• Gadai atas penyertaan saham Perusahaan di IIC; • Pledge of the Company’s investments in shares of
stock of IIC;
- 136 -
Page 141
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
• Gadai atas penyertaan saham Perusahaan dan • Pledge of the Company’s and IIC’s investments in
IIC di KJA; shares of stock of KJA;
• Gadai atas penyertaan saham TPEC di TS; • Pledge of TPEC’s investments in shares of stock of
TS;
• Jaminan atas saham-saham di atas dibagi secara • The above pledge of shares collaterals are shared
pari passu dengan Obligasi VI dan VII dan pari passu with Notes VI and VII and certain
pinjaman sindikasi tertentu. syndicated loans.
Perusahaan mempunyai hak opsi untuk menarik The Company will be entitled at its option to redeem
seluruh atau sebagian Obligasi 2029 tersebut. Selama all or any portion of the Notes 2029. At any time prior
periode sebelum tanggal 7 Mei 2026, Perusahaan to May 7, 2026, the Company will be entitled at its
mempunyai hak opsi untuk menarik sampai dengan option to redeem up to 35% of the Notes 2029 with
35% dari Obligasi 2029 dengan dana dari hasil satu the net proceeds of one or more equity offerings at a
atau lebih penawaran saham, dengan harga sebesar redemption price of 108.75%. At any time prior to
108,75%. Setiap saat sebelum tanggal 7 Mei 2026, May 7, 2026, the Company will be entitled at its
Perusahaan mempunyai hak opsi untuk menarik option to redeem the Notes 2029, in whole but not in
seluruh Obligasi 2029 pada harga 100% ditambah part, at redemption price equal to 100% plus the
dengan premium yang telah ditentukan dalam applicable premium, as further determined in the
perjanjian obligasi. Pada tanggal 7 Mei 2026 atau Notes 2029 indenture. At any time on or after May 7,
setiap saat setelah tanggal tersebut, Perusahaan 2026, the Company may redeem in whole or in part
mempunyai hak opsi untuk menarik sebagian atau of the Notes 2029 at a redemption price specifically
seluruh Obligasi 2029 dengan harga yang telah described in the Notes 2029 indenture.
ditentukan dalam perjanjian obligasi.
Sehubungan dengan Obligasi 2029 tersebut, In relation to Notes 2029, the Company and certain
Perusahaan dan beberapa entitas anak tertentu subsidiaries are restricted to, among others, perform
dibatasi untuk, diantaranya, melakukan hal-hal the following:
berikut:
• Memperoleh pinjaman tambahan dan • Incur additional indebtedness and issue preferred
menerbitkan saham preferen; stock;
• Membagikan dividen atau membeli atau menebus • Declare dividends on capital stock or purchase or
modal saham; redeem capital stock;
• Berinvestasi atau melakukan pembayaran atas • Make investments or other specified “Restricted
sesuatu yang termasuk dalam “Pembatasan Payments”;
Pembayaran”;
• Menerbitkan atau menjual saham dari entitas • Issue or sell capital stock of restricted subsidiaries;
anak yang telah dibatasi;
• Menjamin utang; • Guarantee indebtedness;
• Menjual aset; • Sell assets;
• Menciptakan hak gadai; • Create any lien;
• Melakukan transaksi penjualan dan sewa • Enter into sale and leaseback transactions;
kembali;
• Melakukan perjanjian yang membatasi • Enter into agreements that restrict the restricted
kemampuan entitas anak dan KJA untuk subsidiaries’ and KJA’s ability to pay dividends and
membayar dividen dan memindahkan aset atau transfer assets or make inter-issuer loans;
menerbitkan pinjaman “antar perusahaan”;
• Melakukan transaksi dengan pemegang saham • Enter into transactions with equity holders or
atau pihak berelasi; affiliates;
• Melakukan konsolidasi atau merger; atau • Effect a consolidation or merger; or
• Melakukan aktivitas di bidang usaha lain. • Engage in different business activities.
Persyaratan-persyaratan tersebut, termasuk These covenants, including the above restrictions, are
pembatasan yang disebutkan diatas, tergantung pada subject to a number of important qualifications and
kualifikasi dan pengecualian tertentu, seperti yang exceptions as described in the Notes 2029 Indenture.
tercantum di dalam perjanjian Wali Amanat Obligasi
2029.
Hasil penerbitan Obligasi 2029 ini digunakan untuk Proceeds of the Notes 2029 were used to fund the
mendanai Tender Offer untuk membeli kembali Tender Offer to repurchase the maximum aggregate
jumlah pokok agregat maksimum Obligasi VII yang principal amount of outstanding Notes VII, to
masih terutang, untuk membeli kembali jumlah repurchase and/or redeem any remaining
terutang Obligasi VII di pasar terbuka, tender offer outstanding Notes VII through open market
- 137 -
Page 142
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
dan/ atau menebus sepanjang diijinkan oleh repurchases, tender offers and/or redemptions as
Perjanjian Obligasi VII; dan menggunakan sisa dana permitted under the indenture governing the Notes
penerbitan untuk membiayai pembelanjaan modal VII; and to use any remaining proceeds to fund
terkait dengan pengembangan dan ekspansi bisnis capital expenditures in connection with the
non batubara. development and expansion of our non-coal related
businesses.
Obligasi 2029 ini memperoleh peringkat “Ba3” dengan The Notes 2029 have been assigned a rating of “Ba3”
outlook stabil dari Moody’s dan “BB-” dengan outlook with stable outlook by Moody’s and “BB-” with stable
stabil dari Fitch. outlook by Fitch.
Hasil penerbitan Obligasi 2029, setelah dipotong Proceeds of the Notes 2029, after netting off with
dengan biaya penerbitan tertentu, telah diterima certain issuance cost, were received on May 7, 2024.
pada tanggal 7 Mei 2024.
Pada tanggal 26 Juni 2024, Perusahaan menerbitkan On June 26, 2024, the Company issued additional
tambahan utang obligasi sebesar US$105.000.000 US$105,000,000 bonds payable, which forms an
yang merupakan satu kesatuan dan mempunyai integral part and has the same terms and condition
ketentuan serta persyaratan yang sama dengan with Notes 2029. The proceeds together with the
Obligasi 2029. Dana hasil penerbitan bersama dengan accruing interest from and including May 7, 2024 and
bunga terhitung sejak dan termasuk 7 Mei 2024 up to but excluding July 3, 2024 was received on July
sampai dengan namun tidak termasuk 3 Juli 2024 3, 2024.
telah diterima pada tanggal 3 Juli 2024.
Senior Notes VI, US$ 575.000.000 Senior Notes VI, US$ 575,000,000
Pada tanggal 9 Nopember 2017, Indika Energy Capital On November 9, 2017, Indika Energy Capital III Pte.
III Pte. Ltd. (IECPL III), entitas anak yang secara Ltd. (IECPL III), an indirectly wholly owned
tidak langsung dan sepenuhnya dimiliki oleh subsidiary, issued Senior Notes VI (”Notes VI”)
Perusahaan, menerbitkan Obligasi VI (“Obligasi VI”) amounting to US$ 575,000,000, priced at 98.594%.
sejumlah US$ 575.000.000, pada nilai sebesar The Notes will mature in November 2024 and bears
98,594%. Obligasi ini akan jatuh tempo pada bulan interest at 5.875% per annum, payable semiannually
Nopember 2024 dan dikenakan bunga sebesar on May 9 and November 9, commencing May 9, 2018.
5,875% per tahun, terutang setiap 6 bulan pada The Notes are listed on the Singapore Stock
tanggal 9 Mei dan 9 Nopember, dimulai pada tanggal Exchange. In relation to the issuance of the Notes VI,
9 Mei 2018. Obligasi ini tercatat di Singapore Stock Citicorp International Limited acted as “Trustee”,
Exchange. Sehubungan dengan penerbitan Obligasi while the Company, IIC, TPE, TPEC and TS acted as
VI ini, Citicorp International Limited bertindak sebagai Guarantors.
“Trustee” sedangkan Perusahaan, IIC, TPE, TPEC dan
TS menjadi pihak penjamin.
Obligasi VI ini dijamin dengan hak prioritas pertama The Notes VI are secured on a first priority basis by a
dengan jaminan sebagai berikut: lien on the following collaterals:
• Gadai atas saham-saham TPE dan TPEC yang • Pledges of TPE and TPEC’s shares owned by the
dimiliki oleh Perusahaan, TIME dan IIC; Company, TIME and IIC;
• Gadai atas penyertaan saham Perusahaan di IECPL • Pledge of the Company’s investments in shares of
III and IIC; stock of IECPL III and IIC;
• Gadai atas penyertaan saham Perusahaan dan IIC • Pledge of the Company’s and IIC’s investments in
di KJA; shares of stock of KJA;
• Gadai atas penyertaan saham TPEC di TS; • Pledge of TPEC’s investments in shares of stock of
TS;
• Jaminan atas saham-saham di atas dibagi secara • The above pledge of shares collaterals are shared
pari passu dengan Obligasi VII dan pinjaman pari passu with Notes VII and certain syndicated
sindikasi tertentu ( Catatan 54); dan loans (Note 54); and
• Jaminan hak IECPL III atas pinjaman antar- • A security interest in IECPL III’s right under the
perusahaan (Intercompany Loans). Pada tanggal Intercompany Loans. As of reporting dates, all the
laporan keuangan, seluruh pinjaman antar intercompany loans are eliminate for consolidation
perusahaan sudah di eliminasi untuk kepentingan purpose.
konsolidasi.
- 138 -
Page 143
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
IECPL III mempunyai hak opsi untuk menarik seluruh IECPL III will be entitled at its option to redeem all or
atau sebagian Obligasi VI tersebut. Selama periode any portion of the Notes VI. At any time prior to
sebelum tanggal 9 Nopember 2021, IECPL III November 9, 2021, IECPL III will be entitled at its
mempunyai hak opsi untuk menarik sampai dengan option to redeem up to 35% of the Notes VI with the
35% dari Obligasi VI dengan dana dari hasil satu atau net proceeds of one or more equity offerings at a
lebih penawaran saham, dengan harga sebesar redemption price of 105.875%. At any time prior to
105,875%. Setiap saat sebelum tanggal 9 Nopember November 9, 2021, IECPL III will be entitled at its
2021, IECPL III mempunyai hak opsi untuk menarik option to redeem the Notes VI, in whole but not in
seluruh Obligasi VI pada harga 100% ditambah part, at redemption price equal to 100% plus the
dengan premium yang telah ditentukan dalam applicable premium, as further determined in the
perjanjian obligasi. Pada tanggal 9 Nopember 2021 Notes VI indenture. At any time on or after
atau setiap saat setelah tanggal tersebut, IECPL III November 9, 2021, IECPL III may redeem in whole or
mempunyai hak opsi untuk menarik sebagian atau in part of the Notes VI at a redemption price
seluruh Obligasi VI dengan harga yang telah specifically described in the Notes VI indenture.
ditentukan dalam perjanjian obligasi.
Sehubungan dengan Obligasi VI tersebut, Perusahaan In relation to the Notes VI, the Company and certain
dan beberapa entitas anak tertentu dibatasi untuk, subsidiaries are restricted to, among others, perform
diantaranya, melakukan hal-hal berikut: the following:
• Memperoleh pinjaman tambahan dan menerbitkan • Incur additional indebtedness and issue preferred
saham preferen; stock;
• Membagikan dividen atau membeli atau menebus • Declare dividends on capital stock or purchase or
modal saham; redeem capital stock;
• Berinvestasi atau melakukan pembayaran atas • Make investments or other specified “Restricted
sesuatu yang termasuk dalam “Pembatasan Payments”;
Pembayaran”;
• Menerbitkan atau menjual saham dari entitas anak • Issue or sell capital stock of restricted
yang telah dibatasi; subsidiaries;
• Menjamin utang; • Guarantee indebtedness;
• Menjual aset; • Sell assets;
• Menciptakan hak gadai; • Create any lien;
• Melakukan transaksi penjualan dan sewa kembali; • Enter into sale and leaseback transactions;
• Melakukan perjanjian yang membatasi • Enter into agreements that restrict the restricted
kemampuan entitas anak dan KJA untuk subsidiaries’ and KJA’s ability to pay dividends and
membayar dividen dan memindahkan aset atau transfer assets or make inter-issuer loans;
menerbitkan pinjaman “antar perusahaan”;
• Melakukan transaksi dengan pemegang saham • Enter into transactions with equity holders or
atau pihak berelasi; affiliates;
• Melakukan konsolidasi atau merger; atau • Effect a consolidation or merger; or
• Melakukan aktivitas di bidang usaha lain. • Engage in different business activities.
Persyaratan-persyaratan tersebut, termasuk These covenants, including the above restrictions, are
pembatasan yang disebutkan diatas, tergantung pada subject to a number of important qualifications and
kualifikasi dan pengecualian tertentu, seperti yang exceptions as described in the Notes VI Indenture.
tercantum di dalam perjanjian Wali Amanat Obligasi VI.
Hasil penerbitan Obligasi VI ini digunakan untuk Proceeds of the Notes VI were used to fund the KJA
mendanai Pembelian Saham KJA (selain dari Share Purchase (other than the contingent
pembayaran kontinjensi) dan biaya-biaya yang consideration) and the fees and expenses related
terkait. thereto.
Pada tanggal 8 Juni 2022, IECPL III mengumumkan On June 8, 2022, IECPL III announced that it has
telah melakukan penawaran untuk pembelian kembali commenced an offer to purchase (“Tender Offer”) for
(“Tender Offer”) secara kas atas Obligasi VI yang cash up to US$ 200,000,000 of the Notes VI issued
diterbitkan oleh IECPL III sampai dengan jumlah by IECPL III. Expiration date of the Tender Offer falls
US$ 200.000.000. Batas akhir Tender Offer adalah on July 7, 2022, while settlement date is on July 14,
tanggal 7 Juli 2022, sedangkan tanggal pelunasan 2022.
jatuh pada tanggal 14 Juli 2022.
Pada tanggal 7 Juli 2022, IECPL III berhasil membeli On July 7, 2022, IECPL III has successfully purchased
kembali Obligasi VI sejumlah US$ 183.967.000 US$ 183,967,000 of the Notes VI at a purchase price
dengan harga pembelian sebesar US$ 184.974.253. of US$ 184,974,253. The Tender Offer, including
Tender Offer beserta dengan bunga terutang atas
- 139 -
Page 144
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
Obligasi yang dibeli kembali, dilunasi pada tanggal outstanding accrued interest on the purchased Senior
14 Juli 2022. Notes, were fully settled on July 14, 2022.
IECPL III, melalui Perusahaan, telah membeli kembali IECPL III through the Company has repurchased
Obligasi VI sejumlah US$ 28.637.000 dari pasar US$ 28,637,000 of the Notes VI from open market
terbuka dan telah mengatur pembatalan Senior Notes and has arranged to cancel the Senior Notes
tersebut pada tanggal 15 Juli 2022. Jumlah terutang accordingly on July 15, 2022. Balance of outstanding
Obligasi VI setelah pembatalan dan Tender Offer the Notes VI after the cancellation and Tender Offer
adalah US$ 362.396.000. Pembatalan Obligasi VI was US$ 362,396,000. The cancellation for Notes VI
berlaku efektif pada tanggal 3 Agustus 2022. was effective on August 3, 2022.
Selama periode 1 Juli 2022 sampai dengan For the period starting from July 1, 2022 to
12 Oktober 2022, IECPL III, melalui Perusahaan, October 12, 2022, IECPL III through the Company
telah membeli kembali Obligasi VI sejumlah has repurchased US$ 29,019,000 of Notes VI from
US$ 29.019.000 dari pasar terbuka dan telah open market and has arranged to cancel the Notes VI
mengatur pembatalan Obligasi VI tersebut pada accordingly on October 12, 2022. Such cancellation
tanggal 12 Oktober 2022. Pembatalan tersebut was effective on October 19, 2022 and outstanding
berlaku efektif pada tanggal 19 Oktober 2022 dan balance of Notes VI after the cancellation was
jumlah terutang Obligasi VI setelah pembatalan US$ 333,377,000.
adalah US$ 333.377.000.
Selama kuartal keempat tahun 2022, IECPL III secara During the fourth quarter of year 2022, IECPL III
langsung dan tidak langsung melalui Perusahaan, directly and indirectly through the Company has
telah membeli kembali Obligasi VI sejumlah repurchased US$ 10,500,000 of Notes VI from open
US$ 10.500.000 dari pasar terbuka dan telah market and has arranged to cancel the Notes VI
mengatur pembatalan Obligasi VI tersebut pada accordingly on December 6, 2022. Such cancellation
tanggal 6 Desember 2022. Pembatalan tersebut was effective on December 9, 2022 and outstanding
berlaku efektif pada tanggal 9 Desember 2022 dan balance of Notes VI after the cancellation was
jumlah terutang Obligasi VI setelah pembatalan US$ 322,877,000.
adalah US$ 322.877.000.
Pada tahun 2023, IECPL III telah membeli kembali In 2023, IECPL III has repurchased US$ 29,311,000
Obligasi VI sejumlah US$ 29.311.000 dari pasar of Notes VI from open market and has arranged to
terbuka dan telah mengatur pembatalan Obligasi VI cancel the Notes VI accordingly, which becomes
tersebut yang telah efektif pada tanggal effective on September 21, 2023. Outstanding
21 September 2023. Jumlah terutang Obligasi VI balance of Notes VI after the cancellation was
setelah pembatalan adalah US$ 293.566.000 US$ 293,566,000.
Pada tanggal 2 April 2024, IECPL III mengumumkan On April 2, 2024, IECPL III made an announcement
untuk membeli kembali seluruh Obligasi VI yang to redeem all the outstanding Note VI at a redemption
masih terutang dengan harga pembelian sebesar price equal to 100% of the principal amount plus
100% dari jumlah pokok ditambah dengan bunga accrued and unpaid interest, if any, to (but not
terutang dan belum dibayar, jika ada, sampai dengan including) the Redemption Date, which falls on May 3,
(namun tidak termasuk) Tanggal Pembelian Kembali, 2024.
yaitu pada tanggal 3 Mei 2024.
Pembelian kembali tersebut didanai melalui penarikan The redemption was financed through a loan
utang dari fasilitas sebesar US$300 juta yang drawdown from US$300 million facility provided by PT
diberikan oleh PT Bank Mandiri (Persero) Tbk dan PT Bank Mandiri (Persero) Tbk and PT Bank Negara
Bank Negara Indonesia (Persero) Tbk kepada Indonesia (Persero) Tbk to the Company (Note 31).
Perusahaan (Catatan 31).
Pada tanggal 3 Mei 2024, IECPL III telah melunasi On May 3, 2024, IECPL III has fully repaid all the
seluruh Obligasi VI yang masih terutang. outstanding balance of Note VI.
Senior Notes VII, US$ 675.000.000 Senior Notes VII, US$ 675,000,000
Pada tanggal 22 Oktober 2020, Indika Energy Capital On October 22, 2020, Indika Energy Capital IV Pte.
IV Pte. Ltd. (IECPL IV), entitas anak yang secara tidak Ltd. (IECPL IV), an indirect wholly owned subsidiary
langsung sepenuhnya dimiliki oleh Perusahaan, of the Company, issued Senior Notes amounting to
menerbitkan Senior Notes (“Obligasi”) sebesar US$ 450,000,000. The Notes will mature in October
US$ 450.000.000. Obligasi tersebut jatuh tempo 2025 and bears interest at 8.25% per annum, payable
Oktober 2025 dan dikenakan bunga sebesar 8,25% semiannually on April 22 and October 22,
per tahun, terutang setiap enam bulan, dibayar setiap commencing April 22, 2021. On November 4, 2020,
tanggal 22 April dan 22 Oktober setiap tahun, dimulai IECPL IV issued additional Senior Notes amounting to
- 140 -
Page 145
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
pada tanggal 22 April 2021. Pada tanggal US$ 225,000,000, to be consolidated and form a
4 November 2020, IECPL IV menerbitkan Obligasi single series with the US$ 450,000,000 Notes
tambahan sebesar US$ 225.000.000, yang akan described above. Both Senior Notes will be referred
terkonsolidasi dan menjadi satu kesatuan dengan herein as Notes VII.
Obligasi sebesar US$ 450.000.000 yang dijelaskan di
atas. Kedua Obligasi tersebut akan disebut sebagai
Obligasi VII dalam laporan ini.
Obligasi VII tercatat di Singapore Stock Exchange. The Notes VII are listed on the Singapore Stock
Sehubungan dengan penerbitan Obligasi VII, Citicorp Exchange. In relation to the issuance of the Notes VII,
International Limited bertindak sebagai Wali Amanat, Citicorp International Limited acted as trustee, while
sedangkan Perusahaan, IIC, TIME, TPE, TPEC dan TS the Company, IIC, TIME, TPE, TPEC and TS acted as
menjadi pihak Penjamin. Guarantors.
Obligasi VII ini dijamin dengan hak prioritas pertama The Notes VII are secured on a first priority basis by
dengan jaminan sebagai berikut: a lien on the following collaterals:
• Gadai atas saham TPE dan TPEC yang dimiliki oleh • Pledges TPE and TPEC’s shares owned by the
Perusahaan, TIME dan IIC; Company, TIME and IIC;
• Gadai atas penyertaan saham Perusahaan di • Pledge of the Company’s investments in shares of
IECPL IV dan IIC; IECPL IV and IIC;
• Gadai atas penyertaan saham Perusahaan dan IIC • Pledge of the Company’s and IIC’s investment in
di KJA; shares of stock of KJA;
• Gadai atas penyertaan saham TPEC di TS; • Pledge of TPEC’s investments in TS; The above
Jaminan gadai saham diatas dibagi secara pari pledge of shares collaterals are shared pari passu
passu dengan Obligasi VI dan pinjaman sindikasi with Notes VI and certain syndicated loans
tertentu ( Catatan 54); dan ( Note 54); and
• Jaminan hak IECPL IV atas pinjaman antar entitas • A security interest in IECPL IV’s right under the
(Intercompany Loans). Pada tanggal pelaporan, Intercompany Loans. As of reporting dates, all the
seluruh pinjaman antar entitas telah dieliminasi intercompany loans are eliminated for
untuk tujuan penyajian laporan keuangan consolidation purposes.
konsolidasian.
IECPL IV mempunyai hak opsi untuk menarik seluruh IECPL IV will be entitled at its option to redeem all or
atau sebagian Obligasi VII tersebut. Selama periode any portion of the Notes VII. At any time prior to
sebelum tanggal 22 Oktober 2022, IECPL IV October 22, 2022, IECPL IV will be entitled at its
mempunyai hak opsi untuk menarik sampai dengan option to redeem up to 35% of the Notes VII with the
35% dari Obligasi VII dengan dana dari hasil satu atau net proceeds of one or more equity offerings at a
lebih penawaran saham, dengan harga sebesar redemption price of 108.25%. At any time prior to
108,25%. Setiap saat sebelum tanggal 22 Oktober October 22, 2022, IECPL IV will be entitled at its
2022, IECPL IV mempunyai hak opsi untuk menarik option to redeem the Notes VII, in whole but not in
seluruh Obligasi VII pada harga 100% ditambah part, at redemption price equal to 100% plus the
dengan premium yang telah ditentukan dalam applicable premium, as further determined in the
perjanjian obligasi. Pada tanggal 22 Oktober 2022 Notes VII indenture. At any time on or after
atau setiap saat setelah tanggal tersebut, IECPL IV October 22, 2022, IECPL IV may redeem in whole or
mempunyai hak opsi untuk menarik sebagian atau in part of the Notes VII at redemption price
seluruh Obligasi VII dengan harga yang telah specifically described in the Notes VII indenture.
ditentukan dalam perjanjian obligasi.
Sehubungan dengan Obligasi VII tersebut, In relation to the Notes VII, the Company and certain
Perusahaan dan beberapa entitas anak tertentu subsidiaries are restricted to conduct certain
dibatasi untuk, diantaranya, melakukan transaksi transactions, as further described in the Notes VII
tertentu sebagaimana disetujui dalam perjanjian Indenture. These covenants, including the above
obligasi VII. Persyaratan-persyaratan tersebut, restrictions, are subject to a number of important
termasuk pembatasan yang disebutkan diatas, qualifications and exceptions as described in the
tergantung pada kualifikasi dan pengecualian Notes VII Indenture.
tertentu, seperti yang tercantum di dalam perjanjian
Wali Amanat Obligasi VII.
- 141 -
Page 146
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
Hasil penerbitan bersih Obligasi VII, setelah dikurangi Net proceeds of the Notes VII, after deducting the
dengan biaya transaksi terkait, digunakan untuk relevant transaction costs, were used to (i) redeem in
(i) melunasi seluruh Obligasi IV dengan jumlah pokok full the outstanding Notes IV in the aggregate
utang sebesar US$ 285.000.000; (ii) melunasi principal amount of US$ 285,000,000; (ii) redeem in
seluruh Obligasi V dengan jumlah pokok utang full the outstanding Notes V in the aggregate principal
sebesar US$ 265.000.000; dan (3) membiayai amount of US$ 265,000,000; and (iii) fund the plans
rencana untuk mengembangkan usaha non-batu bara to expand non-coal related businesses as well as
serta pembayaran utang Perusahaan dan/atau entitas settlement of debt of the Company and/or its
anak. subsidiaries.
Pada tanggal 8 Juni 2022, IECPL IV mengumumkan On June 8, 2022, IECPL IV announced that it has
telah melakukan penawaran untuk pembelian kembali commenced an offer to purchase (“Tender Offer”) for
(“Tender Offer”) secara kas atas Obligasi VII yang cash up to US$ 50,000,000 of the Notes VII issued by
diterbitkan oleh IECPL IV sampai dengan jumlah IECPL IV. Expiration date of the Tender Offer falls on
US$ 50.000.000. Batas akhir Tender Offer adalah July 7, 2022, while settlement date is on July 14,
tanggal 7 Juli 2022, sedangkan tanggal pelunasan 2022.
jatuh pada tanggal 14 Juli 2022.
Pada tanggal 7 Juli 2022, IECPL IV membeli kembali On July 7, 2022, IECPL IV purchased US$56,571,000
Obligasi VII sejumlah US$56.571.000 dengan harga of the Notes VII at a purchase price of
US$56.712.428. Tender Offer beserta dengan bunga US$56,712,428. The Tender Offer, including
terutang atas Obligasi yang dibeli kembali, dilunasi outstanding accrued interest on the purchased Senior
pada tanggal 14 Juli 2022. Notes, were fully settled on July 14, 2022.
Pada tanggal 15 Juli 2022, IECPL IV telah membeli On July 15, 2022, IECPL IV has repurchased and
kembali dan membatalkan Obligasi VII sejumlah cancelled US$ 19,550,000 of the Notes VII, hence
US$ 19.550.000, sehingga jumlah terutang Obligasi total outstanding the Notes VII after Tender Offer and
VII setelah Tender Offer dan pembatalan adalah cancellation was US$ 598,879,000. The cancellation
sebesar US$ 598.879.000. Pembatalan Obligasi VII for Notes VII was effective on August 3, 2022.
berlaku efektif pada tanggal 3 Agustus 2022.
Selama kuartal keempat tahun 2022, IECPL IV secara During the fourth quarter of year 2022, IECPL IV
langsung dan tidak langsung melalui Perusahaan, directly and indirectly through the Company has
telah membeli kembali Obligasi VII sejumlah repurchased US$ 30,941,000 of Notes VII from open
US$ 30.941.000 dari pasar terbuka dan telah market and has arranged to cancel the Notes VII
mengatur pembatalan Obligasi VII tersebut pada accordingly on December 6, 2022. Such cancellation
tanggal 6 Desember 2022. Pembatalan tersebut was effective on December 9, 2022 and outstanding
berlaku efektif pada tanggal 9 Desember 2022 dan balance of Notes VII after the cancellation was
jumlah terutang Obligasi VII setelah pembatalan US$ 567,938,000.
adalah US$ 567.938.000.
Pada tahun 2023, IECPL IV telah membeli kembali In 2023, IECPL IV has repurchased US$ 33,874,000
Obligasi VII sejumlah US$ 33.874.000 dari pasar of Notes VII from open market and has arranged to
terbuka dan telah mengatur pembatalan Obligasi VII cancel the Notes VII accordingly, which becomes
tersebut yang telah efektif pada tanggal 20 November effective on November 20, 2023. Outstanding
2023. Jumlah terutang Obligasi VII setelah balance of Notes VII after the cancellation was
pembatalan adalah US$ 534.064.000. US$ 534,064,000.
Pada bulan April 2024, IECPL IV melakukan In April 2024, IECPL IV announced an offer to
penawaran untuk pembelian kembali (“Tender Offer”) purchase (“Tender Offer”) for cash of the Notes VII
secara kas atas Obligasi VII dengan harga US$962,5 with consideration of US$962.5 per each US$1,000
untuk setiap US$1.000 jumlah pokok terutang dan principal amount outstanding and an additional
tambahan US$50 untuk setiap US$1.000 jumlah US$50 per each US$1,000 principal amount for early
pokok terutang atas Tender Offer awal. Tender Offer.
Batas akhir Tender Offer adalah tanggal 16 Mei 2024 Expiration date of the Tender Offer falls on May 16,
dengan tanggal pelunasan pada 20 Mei 2024, 2024, with settlement date on May 20, 2024, while
sedangkan batas akhir Tender Offer awal adalah 30 early Tender Offer expired on April 30, 2024, with
April 2024, dengan tanggal pelunasan pada 14 Mei settlement date on May 14, 2024.
2024.
- 142 -
Page 147
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
Tender Offer dilakukan secara bersamaan dengan The Tender Offer is being made in connection with a
penawaran atas obligasi baru oleh Perusahaan, concurrent offering of a new Notes by the Company,
dimana jumlah tender offer yang diterima tidak akan whereby the accepted tender offer amount will not
melebihi jumlah pokok keseluruhan dari obligasi baru exceed the aggregate principal amount of the new
yaitu sebesar US$350 juta. Notes, which is US$350 million.
Pada tanggal 30 April 2024, IECPL IV berhasil On April 30, 2024, IECPL IV has successfully
membeli kembali Obligasi VII sejumlah US$ purchased US$ 309,831,000 of the Notes VII at a
309.831.000 dengan harga pembelian sebesar US$ purchase price of US$313,703,888. The Tender Offer,
313.703.888. Tender Offer beserta dengan bunga including outstanding accrued interest on the
terutang atas Obligasi yang dibeli kembali, telah purchased Senior Notes, were fully settled on May 14,
dilunasi pada tanggal 14 Mei 2024. 2024.
Pada batas akhir Tender Offer tanggal 16 Mei 2024, As of Tender Offer cut off on May 16, 2024, IECPL IV
IECPL IV berhasil membeli kembali Obligasi VII has successfully purchased additional US$ 500,000 of
sejumlah US$500.000 dengan harga pembelian the Notes VII at a purchase price of US$481,250. This
sebesar US$481.250. Tender Offer ini beserta dengan Tender Offer, including outstanding accrued interest
bunga terutang atas Obligasi yang dibeli kembali, on the purchased Senior Notes, were fully settled on
telah dilunasi pada tanggal 20 Mei 2024. May 20, 2024.
Pada tahun 2024, IECPL IV telah membeli kembali In 2024, IECPL IV has repurchased US$ 22,185,000
Obligasi VII sejumlah US$ 22.185.000 dari pasar of Notes VII from open market and has arranged to
terbuka dan telah mengatur pembatalan Obligasi VII cancel the Notes VII accordingly, which becomes
tersebut yang telah efektif pada tanggal 18 effective on September 18, 2024. Outstanding
September 2024. Jumlah terutang Obligasi VII balance of Notes VII after the cancellation was US$
setelah pembatalan adalah US$ 201.548.000. 201,548,000.
Pada tanggal 30 September 2024, IECPL IV telah On September 30, 2024, IECPL IV has informed
menginformasikan Trustee bahwa seluruh saldo trustee that all outstanding Notes VII will be
terutang Obligasi VII akan dilunasi seluruhnya pada redeemed in full on October 31, 2024 (the
tanggal 31 Oktober 2024 (“Tanggal Pelunasan”) “Redemption Date”) at a redemption price equal to
dengan harga pelunasan sebesar 100,00% dari 100.00% of the principal amount thereof plus accrued
jumlah pokok ditambah dengan bunga terutang dan and unpaid interest, if any, to (but not including) the
belum dibayar, jika ada, sampai dengan (namun tidak Redemption Date.
termasuk) Tanggal Pelunasan.
Pada tanggal 30 September 2024, obligasi VII ini As of September 30, 2024, the Notes VII have been
memperoleh peringkat “Ba3” dengan outlook stabil assigned a rating of “Ba3” with stable outlook by
dari Moody’s dan “BB-” dengan outlook stabil dari Moody’s and “BB-” with stable outlook by Fitch.
Fitch.
Beban keuangan atas utang obligasi pada tahun 2024 The finance costs incurred for the bonds payable In
sebesar US$ 39.912.932 (2023: US$ 49.954.479 2024 amounted to US$ 39,912,932 (2023:
(Catatan 44). US$ 49,954,479) (Note 44).
Pada tanggal 30 September 2024 dan 31 Desember As of September 30, 2024 and December 31, 2023,
2023, manajemen berpendapat bahwa Grup telah management believes that the Group have complied
memenuhi semua persyaratan yang diwajibkan oleh with all covenants required by the bond holders of the
para pemegang Obligasi tersebut di atas. above Notes.
35. PROVISI REHABILITASI TAMBANG, PENUTUPAN 35. PROVISION FOR MINE REHABILITATION, MINE
TAMBANG DAN PEMBONGKARAN CLOSURE AND DECOMMISSIONING
30 September/ 31 Desember/
September 30, December 31,
2024 2023
US$ US$
Saldo awal 43.265.139 38.687.331 Beginning balance
Penambahan 900.000 6.637.510 Additions
Realisasi - (820.994) Realization
Dipindahkan ke aset tidak lancar yang Transfer to non current assets
dimiliki untuk dijual (Catatan 14) - (1.238.708) held for sale (Note 14)
Saldo akhir 44.165.139 43.265.139 Ending balance
- 143 -
Page 148
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
36. IMBALAN KERJA 36. EMPLOYEE BENEFITS
30 September/ 31 Desember/
September 30, December 31,
2024 2023
US$ US$
Imbalan pasca kerja 27.968.279 25.634.750 Post-employment benefits
Imbalan cuti jangka panjang 847.402 777.715 Long service leave
Jumlah 28.815.681 26.412.465 Total
Grup memberikan imbalan pasca kerja untuk The Group provide post-employment benefits for their
karyawannya sesuai dengan undang-undang yang qualifying employees in accordance with prevailing
berlaku. Jumlah karyawan yang berhak atas imbalan regulations. The number of employees entitled to
pasca kerja tersebut sebanyak 3.859 orang pada the benefits is 3,859 as of September 30, 2024
30 September 2024 (31 Desember 2023: 3.579 orang). (December 31, 2023: 3,579).
Program pensiun imbalan pasti memberikan eksposur The defined benefit pension plan typically exposes the
Grup terhadap risiko aktuarial seperti risiko tingkat Group to actuarial risks such as interest rate risk,
bunga, risiko harapan hidup, dan risiko gaji. longevity risk and salary risk.
Risiko Tingkat Bunga Interest Risk
Penurunan suku bunga obligasi akan meningkatkan A decrease in the bond interest rate will increase the
liabilitas program. plan liability.
Risiko Harapan Hidup Longevity Risk
Nilai kini kewajiban imbalan pasti dihitung dengan The present value of the defined benefit plan liability
mengacu pada estimasi terbaik dari mortalitas is calculated by reference to the best estimate of the
peserta program baik selama kontrak kerja. mortality of the plan participants during their
Peningkatan harapan hidup peserta akan employment. An increase in the life expectancy of the
menigkatkan liabilitas program. plan participants will increase the plan’s liability.
Risiko Gaji Salary Risk
Nilai kini kewajiban imbalan pasti dihitung dengan The present value of the defined benefit plan liability
mengacu pada gaji masa depan peserta program. is calculated by reference to the future salaries of plan
Dengan demikian, kenaikan gaji peserta program participants. As such, an increase in the salary of the
akan meningkatkan liabilitas program itu. plan participants will increase the plan’s liability.
Beban imbalan pasca kerja yang diakui dalam laporan Amounts recognized as expense in the consolidated
laba rugi dan penghasilan komprehensif lain statements of profit or loss and other comprehensive
konsolidasian adalah: income in respect of these post-employment benefits
are as follows:
2024 2023
US$ US$
Biaya jasa kini 2.468.818 1.276.673 Current service costs
Biaya bunga 292.440 455.222 Interest costs
Biaya jasa lalu (50.587) - Past service cost
Keuntungan selisih kurs - (199.917) Gain in foreign exchange
Jumlah 2.710.671 1.531.978 Total
Pengukuran kembali liabilitas imbalan Remeasurement on the net
pasca kerja: defined benefit liability:
Kerugian (keuntungan) aktuarial Actuarial losses (gain) arising from
yang timbul dari perubahan asumsi changes in demographic and
demografik dan keuangan (278.949) 908.011 financial assumptions
Kerugian aktuarial yang timbul Actuarial loss arising from changes
dari perubahan asumsi penyesuaian (20) - in experience adjustments
Komponen imbalan pasti yang diakui dalam Components of defined benefit costs recognized
kerugian komprehensif lain (278.969) 908.011 in other comprehensive loss
Jumlah 2.431.702 2.439.989 Total
Jumlah liabilitas imbalan pasca kerja yang diakui di The amounts recognized in the consolidated
laporan posisi keuangan konsolidasian yang timbul statements of financial position arising from the
dari kewajiban Grup sehubungan dengan imbalan Group obligations with respect to these post-
- 144 -
Page 149
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
pasca kerja dan perubahannya adalah sebagai employment benefits and their movements are as
berikut: follows:
30 September/ 31 Desember/
September 30, December 31,
2024 2023
US$ US$
Saldo awal nilai kini liabilitas tidak Opening balance of present value of
didanai 25.634.750 21.961.221 unfunded obligations
Biaya jasa kini 2.468.818 4.040.249 Current service costs
Penambahan karena akuisisi Addition due to acquisition of
entitas anak (Catatan 1) 301.503 375.818 a subsidiary (Note 1)
(Keuntungan) kerugian selisih kurs 343.976 (405.110) (Gain) Losses in foreign exchange
Biaya bunga 292.440 1.379.203 Interest costs
Pengukuran kembali liabilitas imbalan Remeasurement on the net defined
pasca kerja: benefit liability:
Kerugian (keuntungan) aktuarial yang Actuarial loss (gain) arising from
timbul dari perubahan asumsi changes in demographic and
demografik dan keuangan (278.949) 1.273.903 financial assumptions
Keuntungan aktuarial yang timbul Actuarial gain arising from changes
dari perubahan asumsi penyesuaian (20) (104.709) in experience adjustments
Biaya jasa lalu (50.587) (343.731) Past service costs
Pembayaran manfaat (743.652) (1.982.811) Benefits paid
Dipindahkan ke liabilitas terkait langsung
dengan aset tidak lancar dimiliki Transfer to liabilities directly related to non-current
untuk dijual (Catatan 14) - (559.283) assets held for sale (Note 14)
Saldo akhir nilai kini liabilitas tidak Closing balance of present value of
didanai 27.968.279 25.634.750 unfunded obligations
Perhitungan imbalan pasca kerja pada tanggal The cost of providing post-employment benefits as of
31 Desember 2023 dilakukan oleh aktuaris December 31, 2023 is calculated by independent
independen. Penilaian aktuaria menggunakan metode actuaries. The actuarial valuation was carried out
projected unit credit dan menggunakan asumsi utama using the projected unit credit method and using the
sebagai berikut: following key assumptions:
30 September/September 30 , 2024 31 Desember/December 31 , 2023
Tingkat diskonto per tahun 6,35% - 7,60% Discount rate per annum
Tingkat kenaikan gaji per tahun 5,5% - 10% Salary increment rate per annum
Tingkat kematian 100% TMI4/CSO' 80 Mortality rate
Tingkat ketidak mampuan 5% TMI4/10% CSO' 80 Disability rate
Tingkat pengunduran diri 3% - 12% per tahun sampai dengan Resignation rate
usia 25 -40 tahun, menurun menjadi
0% pada usia 54-55 tahun/
3% - 12% per annum until
age 25 -40 years then decreasing
linearly to 0% at 54-55 years
Usia pensiun normal 55 - 56 Normal retirement age
Asumsi aktuarial yang signifikan dalam penentuan Significant actuarial assumptions for the
liabilitas imbalan pasca kerja adalah tingkat diskonto determination of post-employment benefits obligation
dan tingkat kenaikan gaji yang diharakan. Analisa are discount rate and expected salary increase rate.
sensitivitas dibawah ini ditentukan berdasarkan The sensitivity analysis below have been determined
kemungkinan perubahan atas asumsi tersebut pada based on reasonably possible changes of the
akhir periode pelaporan, sementara asumsi lainnya respective assumptions occurring at the end of the
dianggap konstan. reporting period, while holding all other assumptions
constant.
• Jika tingkat diskonto 1% lebih tinggi, liabilitas • If the discount rate is 1% higher, the post
imbalan kerja pada tanggal 30 September 2024 employment benefits obligation as at
akan turun sebesar US$ 2.051.519 September 30, 2024 would decrease by
(31 Desember 2023: US$ 2.051.519) sedangkan US$ 2,051,519 (December 31, 2023:
penurunan 1% pada tingkat diskonto akan US$ 2.051,519), while decrease by 1% in the
menyebabkan kenaikan liabilitas imbalan kerja discount rate would increase the post-employment
pada tanggal 30 September 2024 sebesar benefit obligation as at September 30, 2024 by
US$ 2.438.020 (31 Desember 2023: US$ 2,438,020 (December 31, 2023:
US$ 2.438.020). US$ 2,438,020).
- 145 -
Page 150
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
• Jika tingkat kenaikan gaji yang diharapkan 1% • If the expected salary incremental rate is 1%
lebih tinggi, liabilitas imbalan kerja pada tanggal higher, the post-employment benefits obligation
30 September 2024 akan meningkat sebesar as at September 30, 2024 would increase by
US$ 2.442.941 (31 Desember 2023: 2.442.941) US$ 2,442,941 (December 31, 2023: 2,442,941),
sedangkan penurunan 1% pada tingkat kenaikan while decrease by 1% in the salary incremental
gaji yang diharapkan akan menyebabkan rate would decrease the post-employment benefit
turunnya liabilitas imbalan kerja pada tanggal obligation as at September 30, 2024 by
30 September 2024 sebesar US$ 2.043.635 US$ 2,043,635 (December 31, 2023:
(31 Desember 2023: 2.043.635). US$ 2,043,635).
Analisa sensitivitas yang disajikan diatas tidak The sensitivity analysis presented above may not be
mewakili perubahan sebenarnya dari liabilitas imbalan representative of the actual change in the post-
pasca kerja karena besar kemungkinan bahwa employment benefits obligation as it is unlikely that
perubahan asumsi tidak saling berdiri sendiri, the change in assumptions would occur in isolation of
melainkan beberapa asumsi saling terkait erat. one another as some of the assumptions may be
correlated.
Lebih jauh lagi, dalam menyajikan analisa sensitivitas Furthermore, in presenting the above sensitivity
diatas, nilai kini liabilitas imbalan pasca kerja dihitung analysis, the present value of the post-employment
dengan menggunakan metode projected unit credit benefits obligation has been calculated using
pada akhir periode pelaporan, sesuai dengan metode projected unit credit method at the end of the
perhitungan yang digunakan dalam menentukan reporting period, which is the same as that applied in
liabilitas imbalan pasca kerja pada laporan posisi calculating the post-employment benefits obligation
keuangan konsolidasian. recognized in the consolidated statement of financial
position.
Liabilitas imbalan pasca kerja pada Grup tidak The Group’s post-employment benefits obligation is
didanai, sehingga menyebabkan kewajiban unfunded, causing benefit payments in the future
pembayaran manfaat langsung pada saat terjadinya when due, which is correlated with the cash
kewajiban pembayaran, dimana hal ini terkait erat availability in the Group. The Group will also
dengan ketersediaan kas pada Grup. Grup juga akan concentrate on managing risk by focusing on efficient
mengelola risiko dengan berfokus pada pengelolaan cash flow management and further strengthening the
arus kas yang efisien dan selanjutnya memperkokoh non-coal business holdings.
lini usaha non-batubara.
Durasi rata-rata tertimbang dari liabilitas imbalan The average duration of the benefit obligation at
pasca kerja pada tanggal 30 September 2024 dan 31 September 30, 2024 and December 31, 2023 is
Desember 2023 berkisar antara 5 sampai 20 tahun. ranging from 5 until 20 years.
37. MODAL SAHAM DAN SAHAM TREASURI 37. CAPITAL STOCK AND TREASURY SHARES
30 September/September 30 , 2024 dan/and
31 Desember/December 31 , 2023
Jumlah Saham/
Number of Shares
(Nilai nominal Persentase
Rp 100 per saham/ Kepemilikan/ Jumlah Modal
Rp 100 par value Percentage of Disetor/Total
Nama Pemegang Saham per share) Ownership Paid-up Capital Name of Stockholders
US$
PT Indika Inti Investindo 1.968.882.699 37,84% 21.499.012 PT Indika Inti Investindo
PT Teladan Resources 1.463.155.591 28,12% 15.976.777 PT Teladan Resources
Agus Lasmono 10.156.000 0,20% 110.897 Agus Lasmono
Indracahya Basuki 1.403.500 0,03% 15.325 Indracahya Basuki
M. Arsjad Rasjid P.M. 1.208.000 0,02% 13.191 M. Arsjad Rasjid P.M.
Azis Armand 1.208.000 0,02% 13.191 Azis Armand
PT Indika Mitra Holdiko 10 0,00% 0,11 PT Indika Mitra Holdiko
Saham masyarakat (masing-masing
dibawah 5%) 1.756.678.200 33,76% 18.903.816 Public shares (each below 5%)
Jumlah saham beredar 5.202.692.000 100,00% 56.532.209 Total outstanding shares
Saham treasuri (Catatan 1c) 7.500.000 - 359.945 Treasury shares (Note 1c)
Jumlah modal ditempatkan dan
disetor 5.210.192.000 100,00% 56.892.154
- 146 -
Page 151
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
38. TAMBAHAN MODAL DISETOR 38. ADDITIONAL PAID-IN CAPITAL
Selisih Nilai Transaksi
Restrukturisasi
Entitas Sepengendali/
Biaya emisi Opsi saham Difference in Value of Modal disetor
Agio saham/ saham/ karyawan/ Restructuring Transaction lainnya/
Paid-in capital Share Employee between Entitites Other Jumlah/
in excess of par issuance cost stock option Under Common Control paid-in capital Total
US$ US$ US$ US$ US$ US$
Penerbitan 833.142.000 saham Issuance of 833,142,000
melalui Penawaran Umum Perdana Company's shares through
saham Perusahaan pada tahun 2008 254.633.211 (15.745.526) - - - 238.887.685 Initial Public Offering in 2008
Tambahan modal disetor pada tahun 2011 Additional paid-in capital in 2011
melalui pelaksanaan opsi saham through exercise of employee and
karyawan dan manajemen - - 1.097.573 - - 1.097.573 management stock options
Difference in Value of Restructuring
Selisih Nilai Transaksi Restrukturisasi between Transaction Entities Under
Entitas Sepengendali (SINTRES) - - - 10.862.663 - 10.862.663 Common Control (SINTRES)
Modal disetor lainnya - - - - 2.978.214 2.978.214 Other paid-in capital
Saldo per 30 September 2024 dan Balance as of September 30, 2024 and
31 Desember 2023 254.633.211 (15.745.526) 1.097.573 10.862.663 2.978.214 253.826.135 December 31, 2023
Pada tahun 2004, Perusahaan mengakuisisi 99,959% In 2004, the Company acquired 99.959% shares of
saham PT Indika Inti Corpindo (IIC). Transaksi ini stock of PT Indika Inti Corpindo (IIC). The acquisition
merupakan transaksi antara entitas sepengendali, was a transaction with an entity under common
karena IIC mempunyai pemegang saham utama yang control as IIC has the same majority stockholder as
sama dengan Perusahaan dengan kepemilikan the Company with ownership interest of 99.959%.
sebesar 99,959%. Selisih antara nilai perolehan dan The difference between the acquisition cost and the
nilai aset bersih yang diperoleh sebesar net assets acquired amounting to US$ 10,862,663
US$ 10.862.663 disajikan sebagai “Selisih Nilai was presented as “Difference in Value of
Transaksi Restrukturisasi Entitas Sepengendali” Restructuring Transaction between Entities Under
sebagai bagian dari ekuitas. Common Control” under equity.
39. KEPENTINGAN NON-PENGENDALI DAN 39. NON-CONTROLLING INTERESTS AND OTHER
PENGHASILAN KOMPREHENSIF LAINNYA COMPREHENSIVE INCOME
a. Kepentingan non-pengendali a. Non-controlling interests
30 September/ 31 Desember/
September 30, December 31,
2024 2023
US$ US$
Saldo awal periode 144.295.066 150.890.266 Balance at beginning of period
Bagian laba entitas anak pada Share in profit of subsidiaries in
periode berjalan 17.922.005 31.359.291 the current period
Akuisisi tambahan saham di CTA - 2.171.542 Acquisition of additional shares in CTA
Akuisisi saham di GSI (Catatan 1d) 1.602.419 - Acquisition of shares in GSI (Note 1d)
Kerugian yang belum direalisasi
atas instrumen keuangan derivatif Unrealized loss on derivative financial
(hedging reserve) (5.085.949) (1.279.505) instrument (hedging reserve)
Dividen entitas anak (21.390.869) (36.782.111) Dividend of subsidiaries
Kepentingan non-pengendali atas Non-controlling interest from establishment
pendirian entitas anak di BIG - 2.000.000 of subsidiary in BIG
Divestasi entitas anak (548.408) (4.163.725) Divestment of subsidiary
Penurunan investasi IPA (Catatan 1d) 605.661 - Decrease of investment in IPA (Notes 1d)
Selisih kurs penjabaran laporan
keuangan (389.347) 99.308 Translation adjustment
Jumlah 137.010.578 144.295.066 Total
Ringkasan informasi keuangan pada masing- Summarized financial information in respect of
masing entitas anak yang memiliki kepentingan each of the subsidiaries that has material non-
non-pengendali yang material ditetapkan di controlling interest is set out below. The
bawah ini. Ringkasan informasi keuangan di summarized financial information below
bawah ini merupakan jumlah sebelum eliminasi represents amounts before intragroup
intra grup. eliminations.
- 147 -
Page 152
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
KJA PEI
30 September/ 31 Desember/ 30 September/ 31 Desember/
September 30, December 31, September 30, December 31,
2024 2023 2024 2023
US$ US$ US$ US$
Aset lancar 513.307.903 534.514.832 1.403.610 1.165.783 Current assets
Aset tidak lancar 143.755.754 141.050.377 151.590.459 148.758.535 Noncurrent assets
Jumlah Aset 657.063.657 675.565.209 152.994.069 149.924.318 Total Assets
Liabilitas jangka pendek 339.078.516 291.744.253 42.683 72.804 Current liabilities
Liabilitas jangka panjang 58.731.629 56.964.545 - - Noncurrent liabilities
Jumlah Liabilitas 397.810.145 348.708.798 42.683 72.804 Total Liabilities
KJA PEI
2024 2023 2024 2023
US$ US$ US$ US$
Pendapatan 1.404.883.530 1.706.242.729 10.044.910 11.117.121 Income
Beban (1.287.486.429) (1.526.902.896) 17.794 - Expenses
Laba periode berjalan 117.397.101 179.339.833 10.062.704 11.117.121 Profit for the period
Laba yang dapat diatribusikan
kepada: Profit attributable to:
Pemilik entitas induk 117.397.101 179.339.833 10.058.720 11.112.891 Owners of the Company
Kepentingan non-pengendali - - 3.984 4.230 Non-controlling interests
Laba periode berjalan 117.397.101 179.339.833 10.062.704 11.117.121 Profit for the period
Laba komprehensif lain yang Other comprehensive income
dapat diatribusikan kepada: attributable to:
Pemilik entitas induk - - (6.967.876) 9.540.969 Owners of the Company
Kepentingan non-pengendali - - - - Non-controlling interests
Jumlah laba komprehensif Total comprehensive income
periode berjalan 117.397.101 179.339.833 3.094.828 20.658.090 for the period
Pemilik entitas induk 117.397.101 179.339.833 3.090.844 20.653.860 Owners of the Company
Kepentingan non-pengendali - - 3.984 4.230 Non-controlling interests
Jumlah laba komprehensif Total comprehensive income
periode berjalan 117.397.101 179.339.833 3.094.828 20.658.090 for the period
Dividen yang dibayarkan kepada Dividends paid to non
kepentingan non-pengendali 16.650.000 36.000.000 - - controlling interests
Kas masuk (keluar) bersih dari: Net cash inflow (outflow) from:
Kegiatan operasi 74.237.369 (178.971.183) (14.066) (14.632) Operating activities
Kegiatan investasi (6.464.129) (72.942.400) (958) - Investing activities
Kegiatan pendanaan (120.141.233) (400.181.926) - - Financing activities
Dividen Dividend
Berdasarkan Rapat Umum Pemegang Saham Based on Annual General Meeting of
Tahunan KJA tanggal 28 Maret 2024, diputuskan Shareholders of KJA dated March 28, 2024, it is
bahwa KJA akan membagikan dividen dari kinerja approved that KJA will distribute dividend from its
keuangan tahun 2023 sebesar US$ 185.000.000 2023 financial performance at the amount of US$
185,000,000.
Dividen ini akan dibayar dalam empat tahap, Such dividend will be paid in four stages, wherein
yaitu sebesar US$ 50.000.000 pada bulan April US$ 50,000,000 paid in April 2024 and US$
2024 dan sisanya sebesar US$ 45.000.000 45,000,000 each in June, August and October
masing-masing pada bulan Juni, Agustus dan 2024.
Oktober 2024.
Bagian kepentingan non-pengendali atas dividen Non-controlling interests’s portion of such
ini sebesar US$ 16.650.000. Pada tanggal 30 dividend was US$ 16,650,000. As of September
September 2024, dividend yang belum dibayar 30, 2024, unpaid dividend to non-controlling
kepada kepentingan non-pengendali sebesar interests amounted to US$ 4,049,975.
US$4.049.975.
- 148 -
Page 153
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
Berdasarkan Rapat Umum Pemegang Saham Based on Annual General Meeting of
Tahunan KJA tanggal 17 Maret 2023, diputuskan Shareholders of KJA dated March 17, 2023, it is
bahwa KJA akan membagikan dividen final dari approved that KJA will distribute final dividend
kinerja keuangannya selama tahun 2022 sebesar from its 2022 financial performance at the
US$ 600.000.000, termasuk dividen interim amount of US$ 600,000,000, including interim
sebesar US$ 200.000.000 yang diputuskan pada dividend of US$ 200,000,000 declared in
bulan September 2022. September 2022.
Dividen ini akan dibayar dalam dua tahap, yaitu Such dividend will be paid in two stages, wherein
sebesar US$ 150.000.000 pada bulan Maret 2023 US$ 150,000,000 in March 2023 and the
dan sisanya pada bulan Mei 2023. remaining in May 2023.
Bagian kepentingan non pengendali atas dividen NCI’s portion of such final dividend was
final ini sebesar US$ 36.000.000. US$ 36,000,000.
b. Komponen ekuitas lainnya c. b. Other component of equity
i. Akumulasi selisih kurs penjabaran laporan ii. i. Cumulative translation adjustments
keuangan
Selisih kurs yang berkaitan dengan Exchange differences relating to the
penjabaran dari aset bersih dari entitas anak translation of the net assets of the
yang menggunakan mata uang fungsional subsidiaries using different functional
selain mata uang penyajian Grup yaitu mata currency other than the Group presentation
uang Dollar Amerika Serikat diakui langsung currency (i.e. U.S. Dollar) are recognized
dalam pendapatan komprehensif lain dan directly in other comprehensive income and
diakumulasikan dalam selisih penjabaran atas accumulated in the foreign currency
laporan keuangan. Selisih kurs yang translation reserve. Exchange differences
sebelumnya diakumulasi dalam selisih kurs previously accumulated in the foreign
penjabaran atas laporan keuangan, currency translation reserve are reclassified
direklasifikasi ke laba rugi pada saat to profit or loss on the disposal of those
pelepasan entitas anak. subsidiaries.
ii. Penghasilan komprehensif lain ii. Other comprehensive income
2024 2023
Jumlah sebelum Manfaat (beban) Jumlah setelah Jumlah sebelum Manfaat (beban) Jumlah setelah
pajak/Amount pajak/tax benefit pajak/Amount pajak/Amount pajak/tax benefit pajak/Amount
before tax (expense) after tax before tax (expense) after tax
US$ US$ US$ US$ US$ US$
Penghasilan komprehensif lain: Other comprehensive income:
Pengukuran kembali atas Remeasurement of defined benefits
kewajiban imbalan pasti 278.969 (61.373) 217.596 (908.010) 199.762 (708.248) obligation
Akumulasi selisih kurs karena
penjabaran laporan keuangan 187.964 (41.352) 146.612 (1.310.890) 288.396 (1.022.494) Cumulative translation adjustments
Keuntungan (kerugian) yang belum
direalisasi atas instrumen Unrealized gain (loss) on derivative
keuangan derivatif financial instruments
(hedging reserve ) (9.637.314) 2.120.209 (7.517.105) 10.178.381 (2.239.244) 7.939.137 (hedging reserve)
Keuntungan (kerugian) yang belum
direalisasi atas investasi pada nilai Unrealized gain (loss) on investment
wajar melalui penghasilan stated fair value through
komprehensif lainnya (4.195.888) 923.095 (3.272.793) 871.919 (191.822) 680.097 other comprehensive income
Keuntungan (kerugian) komprehensif Other comprehensive income (loss)
lain periode berjalan (13.366.269) 2.940.579 (10.425.690) 8.831.400 (1.942.908) 6.888.492 for the period
- 149 -
Page 154
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
40. PENDAPATAN 40. REVENUES
2024 2023
US$ US$
Pendapatan kontrak dan jasa Contracts and services revenues
BP Berau Ltd. 42.579.822 152.775.779 BP Berau Ltd.
PT Pertamina EP 25.659.235 - PT Pertamina EP
PT Exxon Mobil Indonesia 22.023.093 20.992.958 PT Exxon Mobil Indonesia
PT Shell Manufacturing Indonesia 15.331.482 - PT Shell Manufacturing Indonesia
PT Pertamina Hulu Rokan 14.679.516 12.081.255 PT Pertamina Hulu Rokan
PT Pupuk Kalimantan Timur 13.096.213 - PT Pupuk Kalimantan Timur
PT Indy Digital Investama 7.642.931 - PT Indy Digital Investama
CSTS Joint Operation 5.774.169 9.936.227 CSTS Joint Operation
Lain-lain (masing-masing dibawah
US$ 4 juta) 42.031.195 33.503.141 Others (each below US$ 4 million)
Subjumlah 188.817.656 229.289.360 Subtotal
Penjualan batubara Sales of coal
Pelanggan luar negeri 1.118.055.203 1.686.565.675 Foreign customers
Pelanggan dalam negeri 442.261.804 357.133.366 Domestic customers
Subjumlah 1.560.317.007 2.043.699.041 Subtotal
Perdagangan lainnya Other trading
Pelanggan luar negeri 16.434.360 2.812.273 Foreign customers
Pelanggan dalam negeri 18.598.604 22.927.868 Domestic customers
Subjumlah 35.032.964 25.740.141 Subtotal
Jumlah 1.784.167.627 2.298.728.542 Total
7,19% dari jumlah pendapatan pada tahun 2024 7.19% of the total revenues in 2024 (2023: 5.19%)
(2023: 5,19%) dilakukan dengan pihak berelasi were made to related parties (Note 52).
(Catatan 52).
Tabel berikut merinci pendapatan berdasarkan segmen The following table details revenue based on the
operasi Grup: Group’s operation segment:
2024 2023
US$ US$
Sumber daya energi 1.561.856.424 2.048.725.295 Energy resources
Jasa energi 145.684.934 181.784.665 Energy services
Logistik dan infrastruktur 28.719.490 29.188.002 Logistic and infrastructure
Bisnis hijau 22.694.560 10.644.661 Green business
Ventura digital 11.222.865 4.251.580 Digital ventures
Mineral 4.756.714 4.475.035 Mineral
Pendapatan lainnya 9.232.640 19.659.304 Other revenue
Jumlah 1.784.167.627 2.298.728.542 Total
Tabel berikut merinci pendapatan berdasarkan waktu The following table details revenue based on timing of
pengakuan pendapatan: revenue recognition:
2024 2023
US$ US$
Pada waktu tertentu 1.604.808.078 2.080.934.147 At a point in time
Sepanjang waktu 179.359.549 217.794.395 Over time
Jumlah 1.784.167.627 2.298.728.542 Total
Tidak terdapat pelanggan pihak ketiga dengan transaksi None of the revenues to third party customer
lebih dari 10% dari jumlah pendapatan konsolidasian represented more than 10% of the total consolidated
pada periode sembilan bulan yang berakhir pada 30 revenues for the nine-month period ended September
September 2024 dan 2023. 30, 2024 and 2023.
- 150 -
Page 155
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
41. BEBAN POKOK KONTRAK DAN PENJUALAN 41. COST OF CONTRACTS AND GOODS SOLD
2024 2023
US$ US$
Sub-kontraktor, instalasi, beban Sub-contractors, installations,
perlengkapan komunikasi dan communications supplies expense
beban usaha langsung 603.336.110 771.024.136 and other direct costs
Royalti 333.153.575 572.883.224 Royalty
Bahan baku 188.127.362 190.931.755 Materials
Bahan bakar 108.625.127 115.233.944 Fuel
Bongkar muat 74.986.063 62.561.626 Handling
Sewa, perbaikan dan pemeliharaan 62.424.344 35.456.638 Rental, repairs and maintenance
Gaji, upah dan tunjangan karyawan 48.621.396 42.743.202 Salaries, wages and allowances
Biaya pemakaian barang 21.829.972 7.773.343 Consumables
Penyusutan dan amortisasi (Catatan 18, Depreciation and amortization (Notes 18,
22, 23 dan 24) 19.350.018 18.963.844 22, 23 and 24)
Beban reklamasi dan lingkungan 16.603.080 14.394.323 Environment and reclamation expenses
Jasa profesional 5.328.704 3.297.261 Professional fees
Perjalanan dinas dan transportasi 2.391.717 5.490.915 Travel and transportation
(Kenaikan) penurunan persediaan batubara (7.327.901) 15.050.422 (Increase) decrease in coal inventory
Lain-lain (masing-masing
dibawah US$ 5 juta) 37.324.706 3.149.121 Others (each below US$ 5 million)
Jumlah 1.514.774.273 1.858.953.754 Total
Rincian pemasok pihak ketiga dengan transaksi lebih Revenues to the following third party supplier
dari 10% dari jumlah pendapatan konsolidasian pada represented more than 10% of the total consolidated
periode yang bersangkutan adalah sebagai berikut: revenues of the respective period:
2024 2023
US$ US$
PT Pamapersada Nusantara 271.444.312 233.266.772 PT Pamapersada Nusantara
42. BEBAN PENJUALAN, UMUM DAN ADMINISTRASI 42. SELLING, GENERAL AND ADMINISTRATIVE
EXPENSES
2024 2023
US$ US$
Gaji, upah, dan tunjangan karyawan 49.085.550 51.757.059 Salaries, wages, and employee benefits
Beban pemasaran dan komisi 29.799.601 38.982.218 Marketing and commissions expense
Jasa profesional 18.779.911 17.646.340 Professional fees
PNBP bagian pemerintah pusat dan PNBP for central and
pemerintah daerah 13.151.380 22.849.845 local government's share
Penyusutan dan amortisasi (Catatan 22, 23 Depreciation and amortization (Notes 22, 23
dan 24) 6.757.266 5.938.754 and 24)
Sewa 3.178.190 9.215.132 Rental
Perjalanan dinas dan transportasi 1.159.257 2.536.582 Travel and transportation
Lisensi dan perijinan 524.559 1.641.034 License and permit
Asuransi 194.964 1.000.377 Insurance
Biaya kompensasi Domestic Market Compensation of Domestic Market
Obligation (DMO) - 10.420.812 Obligation (DMO)
Lain-lain (masing-masing
dibawah US$ 1 juta) 10.515.645 31.476.378 Others (each below US$ 1 million)
Jumlah 133.146.323 193.464.531 Total
- 151 -
Page 156
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
43. PENDAPATAN INVESTASI 43. INVESTMENT INCOME
2024 2023
US$ US$
Penghasilan bunga: Interest income:
Jasa giro dan lain-lain 6.751.837 5.599.099 Current and other bank accounts
Deposito berjangka 6.978.329 5.894.534 Time deposits
Investasi pada pihak ketiga 1.917.400 - Investment in third parties
Piutang pihak berelasi (Catatan 52) 731.605 729.071 Loans to related party (Note 52)
Jumlah penghasilan bunga 16.379.171 12.222.704 Total interest income
Pendapatan dividen 128.000 101.200 Dividend income
Total keuntungan yang telah dan belum
terealisasi atas investasi pada pihak Total realized and unrealized gain on
ketiga (Catatan 6) 121.732 1.306.752 investment in third parties (Note 6)
Pembelian investasi di bawah (di atas) par (Catatan 6) (227.789) 714.341 Purchase of investment below (above) par (Note 6)
Lainnya - 508.095 Others
Jumlah 16.401.114 14.853.092 Total
44. BEBAN KEUANGAN 44. FINANCE COSTS
2024 2023
US$ US$
Beban bunga atas utang obligasi Interest expense on bonds payable
(Catatan 34) 39.912.932 49.954.479 (Note 34)
Bunga atas utang bank dan pinjaman Interest on bank loans and long-term
jangka panjang (Catatan 27, 31 dan 54) 19.131.277 9.256.467 loans (Notes 27, 31 and 54)
Amortisasi biaya emisi dan diskon Amortization of bonds issuance costs
obligasi (Catatan 34) 4.205.587 2.977.132 and discount (Note 34)
Premi pelunasan lebih awal obligasi Premium on early redemption of
Senior Notes (Catatan 34) 3.854.138 - Senior Notes (Note 34)
Lain-lain (masing-masing
dibawah US$ 2 juta) 4.653.934 376.097 Others (each below US$ 2 million)
Jumlah 71.757.868 62.564.175 Total
45. LAIN-LAIN – BERSIH 45. OTHERS – NET
2024 2023
US$ US$
Pengembalian klaim pengembalian
pajak (Catatan 47) 11.084.252 - Refund from claims for tax refund (Note 47)
Keuntungan pelepasan aset tetap Gain on disposal of property, plant and
(Catatan 14 dan 22) 7.873.850 79.129 equipment (Notes 14 and 22)
Penanganan bahan bakar 3.611.321 8.586.354 Fuel handling
Pembelian dengan diskon saham Gain from a bargain purchase of shares
GSI (Catatan 1) 2.351.718 - in GSI (Note 1)
Kerugian revaluasi (Catatan 1d) (1.059.010) - Loss on revaluation (Note 1d)
Pajak penghasilan luar negeri (2.196.379) (4.401.612) Foreign witholding tax
Demurage dikurangi dispatch (3.388.944) (4.401.229) Demurage net off dispatch
Kerugian atas divestasi MUTU
(Catatan 14) (3.902.998) - Loss on divestment of MUTU (Note 14)
Denda penghentian awal hak Penalty on early termination of
pemasaran ICI (4.231.124) - marketing rights ICI
(Kerugian) keuntungan kurs mata uang
asing - bersih (4.502.818) 824.680 (Loss) gain on foreign exchange - net
Lain-lain - bersih 3.131.410 4.883.541 Miscellaneous - net
Jumlah 8.771.278 5.570.863 Total
46. PAJAK FINAL 46. FINAL TAX
Pajak final berasal dari Perusahaan, IPY, TPE, TPEC, Final tax is derived from the Company, IPY, TPE,
IMP, CTA dan ILSS sehubungan dengan pendapatan TPEC, IMP, CTA and ILSS which is related to income
yang berasal dari pengoperasian sewa gedung, from office rental, construction contracts and coal
kontrak konstruksi dan jasa pengangkutan batu bara. transshipment services.
- 152 -
Page 157
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
47. PAJAK PENGHASILAN 47. INCOME TAX
Pajak penghasilan Grup terdiri dari: Income tax of the Group consists of the following:
2024 2023
US$ US$
Pajak kini 37.102.260 66.936.708 Current tax
Pajak tangguhan 5.780.462 (4.718.692) Deferred tax
Jumlah beban pajak - bersih 42.882.722 62.218.016 Total income tax expense - net
Pajak Kini Current Tax
Rekonsiliasi antara laba sebelum pajak menurut A reconciliation between profit before tax per
laporan laba rugi dan penghasilan komprehensif lain consolidated statements of profit or loss and other
konsolidasian dan rugi fiskal adalah sebagai berikut: comprehensive income and fiscal loss is as follows:
2024 2023
US$ US$
Laba sebelum pajak menurut laporan Profit before tax per consolidated
laba (rugi) dan penghasilan statements of profit or loss and
komprehensif lain konsolidasian 95.213.292 181.899.646 other comprehensive income
Dikurangi: Laba sebelum pajak entitas
anak (133.713.261) (226.377.159) Less: Profit before tax of the subsidiaries
Rugi sebelum pajak - Perusahaan (38.499.969) (44.477.513) Loss before tax - the Company
Perbedaan temporer: Temporary differences:
Beban gaji dan tunjangan (937.935) (8.032.770) Salaries and benefits
Imbalan pasca kerja 372.444 381.644 Post-employment benefits
Perbedaan penyusutan komersial Difference between commercial
dan fiskal 6.961 69.912 and fiscal depreciation
Jumlah (558.530) (7.581.214) Total
Perbedaan yang tidak dapat Nondeductible expenses (nontaxable
diperhitungkan menurut fiskal: income):
Beban gaji dan tunjangan 8.989.559 3.211.028 Salaries and benefits
Lain-lain 26.277.638 939.573 Others
Jumlah 35.267.197 4.150.601 Total
Rugi fiskal (3.791.302) (47.908.126) Fiscal loss
Berdasarkan peraturan perpajakan di Indonesia, Under the Taxation Laws in Indonesia, the Company
Perusahaan melaporkan pajaknya sendiri. Rugi fiskal submits tax returns on a self-assessment basis. Fiscal
dapat dikompensasikan dengan laba fiskal pada masa losses can be utilized against the taxable income for
lima tahun mendatang sejak kerugian fiskal terjadi. a period of five years subsequent to the year the fiscal
loss was incurred.
Perhitungan kurang (lebih) bayar pajak kini adalah Underpayment (overpayment) of corporate income
sebagai berikut: tax is computed as follows:
- 153 -
Page 158
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
2024 2023
US$ US$
Beban pajak kini Current tax expense
Entitas anak 37.102.260 66.936.708 Subsidiaries
Jumlah 37.102.260 66.936.708 Total
Dikurangi pajak dibayar dimuka Less prepaid taxes
Perusahaan The Company
Pasal 22 9.034 Article 23
Pasal 23 45.514 2.969 Article 23
Entitas anak Subsidiaries
Pasal 22 dan 23 21.005.539 25.144.758 Article 22 and 23
Pasal 25 17.795.455 62.185.863 Article 25
Jumlah pajak dibayar dimuka 38.855.542 87.333.590 Total prepaid taxes
Underpayment of
Kurang bayar pajak kini (1.753.282) (20.396.882) corporate income tax
Lebih bayar pajak badan (Catatan 11) Overpayment of corporate income tax (Note 11)
Perusahaan 54.548 2.969 The Company
Entitas anak 2.636.587 23.406.458 Subsidiaries
Jumlah lebih bayar pajak badan 2.691.135 23.409.427 Total overpayment of corporate income tax
Kurang bayar pajak badan (Catatan 29) Underpayment of corporate income tax (Note 29)
Entitas anak 937.853 3.012.545 Subsidiaries
Jumlah kurang bayar pajak badan 937.853 3.012.545 Total underpayment of corporate income tax
Pajak Tangguhan Deferred Tax
Rincian aset (liabilitas) pajak tangguhan entitas anak The details of the subsidiaries’ deferred tax assets
adalah sebagai berikut: (liabilities) are as follows:
Aset Pajak Tangguhan Deferred Tax Assets
Akun ini merupakan aset pajak tangguhan entitas This account represents deferred tax assets of
anak dengan rincian sebagai berikut: subsidiaries as follows:
30 September/ 31 Desember/
September 30, December 31,
2024 2023
US$ US$
Entitas anak Subsidiaries
Aset tetap 846.363 1.070.358 Property, plant and equipment
Piutang usaha 111.246 46.834 Trade accounts receivable
Imbalan pasca kerja 3.683.523 2.198.289 Post-employment benefits
Kewajiban lingkungan, reklamasi, Environmental, reclamation, loss on
kerugian dari penjualan 8.717.560 8.519.560 disposal
Biaya yang masih harus dibayar 5.586.365 5.420.012 Accrued expenses
Rugi fiskal 1.137.759 7.742.438 Fiscal loss
Lain-lain 289.451 584.213 Other
Aset pajak tangguhan - bersih 20.372.267 25.581.704 Deferred tax assets - net
Liabilitas Pajak Tangguhan Deferred Tax Liabilities
Akun ini merupakan liabilitas pajak tangguhan entitas This account represents deferred tax liabilities of
anak setelah diperhitungkan dengan aset pajak subsidiaries after deducting the deferred tax assets of
tangguhan dari masing-masing entitas usaha, dengan the same business entity as follows:
rincian sebagai berikut:
- 154 -
Page 159
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
30 September/ 31 Desember/
September 30, December 31,
2024 2023
US$ US$
Entitas anak Subsidiaries
Aset tidak berwujud 7.086.002 8.803.845 Intangible assets
Cadangan revaluasi investasi 2.209.900 2.209.900 Investment revaluation reserve
Pinjaman yang dapat dikonversikan - 1.323.839 Convertible loan
Lain-lain (126.110) (83.878) Other
Liabilitas pajak tangguhan - bersih 9.169.792 12.253.706 Deferred tax liabilities - net
Rekonsiliasi antara beban pajak dan hasil perkalian A reconciliation between the tax expense and the
rugi akuntansi sebelum pajak dengan tarif pajak yang amount computed by applying the tax rates to loss
berlaku adalah sebagai berikut: before tax is as follows:
2024 2023
US$ US$
Rugi sebelum pajak - Perusahaan (38.499.969) (44.477.513) Loss before tax - Company
Pajak sesuai tarif pajak yang berlaku (8.469.993) (9.785.053) Tax at applicable tax rate
Pengaruh pajak atas perbedaan
yang tidak dapat diperhitungkan Tax effect of nondeductible
menurut fiskal: expenses (nontaxable income):
Beban gaji dan tunjangan 1.977.703 706.426 Salaries and benefits
Lain-lain 5.781.079 206.707 Others
Jumlah 7.758.782 913.133 Total
Pengaruh pajak atas perbedaan temporer Tax effect of the unrecognized
dan rugi fiskal yang tidak temporary differences and
diperhitungkan 711.211 8.871.920 fiscal loss
Beban pajak - Perusahaan - - Tax expense - Company
Beban pajak - entitas anak (42.882.722) (62.218.016) Tax expense - subsidiaries
Jumlah beban pajak (42.882.722) (62.218.016) Total tax expense
Tarif Pajak Tax Rates
Pada tanggal 31 Maret 2020, Pemerintah On March 31, 2020, the Government issued
mengeluarkan Peraturan Pemerintah Pengganti Government Regulation in Lieu of Law No. 1 Year
Undang-Undang No. 1 Tahun 2020 tentang 2020 concerning “State Financial Policies and
“Kebijakan Keuangan Negara dan Stabilitas Sistem Financial System Stability For Handling the
Keuangan untuk Penanganan Pandemi COVID-19 COVID-19 Pandemic and/or in Facing Threats that
dan/atau dalam Rangka Menghadapi Ancaman yang Endanger the National Economy and/or Financial
Membahayakan Perekonomian Nasional dan/atau System Stability” (“Perpu”). This Perpu, among
Stabilitas Sistem Keuangan” (“Perpu”). Perpu ini others, regulates the adjustment of corporate income
diantaranya mengatur penyesuaian tarif pajak tax rate for domestic tax payers and permanent
penghasilan untuk wajib pajak dalam negeri dan establishments to become 22% in the 2020 and 2021
bentuk usaha tetap menjadi sebesar 22% pada tahun fiscal years and 20% starting from 2022 fiscal year.
pajak 2020 dan 2021 dan 20% sejak tahun pajak
2022.
Sehubungan dengan UU Harmonisasi Peraturan In accordance with the Harmonization of Tax Law
Perpajakan No. 7 Tahun 2021 yang telah disetujui No. 7 of 2021 that was approved on October 7, 2021,
pada tanggal 7 Oktober 2021, mulai pada tahun fiskal starting on fiscal year 2022, the corporate income tax
2022, pajak penghasilan badan akan dikenakan tarif rate will be 22% instead of 20% as previously
22% bukan 20% seperti yang sebelumnya determined. Accordingly, deferred tax assets and
diungkapkan. Oleh karena itu, aset dan liabilitas pajak liabilities have been adjusted to the tax rates that are
tangguhan telah disesuaikan sesuai dengan tarif pajak expected to apply at the period when the asset is
yang berlaku pada periode ketika aset tersebut realized or liability is settled, based on the tax rates
teralisasi atau liabilitas tersebut diselesaikan. enacted.
- 155 -
Page 160
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
Berdasarkan IUPK sebagai Kelanjutan Operasi Based on IUPK as a Continuation of
Kontrak/Perjanjian, tarif pajak KJA adalah 22%. Oleh Contract/Agreement, KJA’s tax rate is 22%.
karena itu, seluruh aset dan liabilitas pajak tangguhan Accordingly, all deferred tax assets and liabilities have
telah diukur menggunakan tarif 22%. been measured at 22%.
Fasilitas Pajak Tax Facility
KGTE KGTE
Pajak dibayar dimuka pasal 4(2) pada 31 Desember Prepaid tax article 4(2) on December 31, 2022 in the
2022 sebesar US$ 3.324.851 merupakan hasil amount of US$ 3,324,851 is the result of exemption
pembebasan dari pemotongan pajak oleh pihak ketiga from withholding taxes by third parties that can be
yang dapat ditagihkan kembali. Pada tanggal 18 charged back. On December 18, 2023, KGTE has
Desember 2023 KGTE telah menerima Sebagian received partially a refund of US$ 2,236,421 and
pengembalian sebesar US$ 2.236.421 dan sisanya remaining balance recorded as claim for tax refund
dicatat pada klaim pengembalian pajak dimana KGTE which KGTE received the refund on January 10 and
menerima pengembalian pada tanggal 10 dan 16 16, 2024.
Januari 2024.
Pada bulan Maret 2020, Menteri Keuangan Republik In March 2020, the Minister of Finance of the Republic
Indonesia menyetujui permohonan pengurangan of Indonesia approved the application for a reduction
pajak penghasilan badan KGTE dan memutuskan: of KGTE's corporate income tax and decided:
a. pengurangan pajak penghasilan badan sebesar a. reduction of corporate income tax of 100% for a
100% untuk jangka waktu 5 (lima) tahun sejak period of 5 (five) years from the tax year KGTE
tahun pajak KGTE beroperasi secara komersial; operates commercially;
b. pengurangan pajak penghasilan badan sebesar b. 50% reduction in corporate income tax for a
50% untuk jangka waktu 2 (dua) tahun sejak period of 2 (two) years from the end of the 100%
berakhirnya pengurangan pajak penghasilan income tax reduction;
100%;
c. pembebasan dari pemotongan dan pemungutan c. exemption from withholding and collection of
pajak oleh pihak ketiga atas penghasilan yang taxes by third parties on income received by KGTE
diterima KGTE untuk jangka waktu 5 (lima) tahun for a period of 5 (five) years from the tax year of
sejak tahun pajak KGTE beroperasi secara KGTE's commercial operations.
komersial.
Surat Ketetapan Pajak Tax Assessment Letters
Perusahaan The Company
Pada tanggal laporan, Perusahaan mempunyai proses As of reporting date, the Company has outstanding
pajak yang masih belum selesai untuk tahun pajak tax claims being process for the following fiscal years:
sebagai berikut:
Tahun pajak 2020 Fiscal year 2020
Pada tanggal 22 Januari 2024, Perusahaan menerima On January 22, 2024, the Company received several
beberapa surat ketetapan pajak (SKPKB) terkait tax assessment letters (SKPKB) in regards with its tax
dengan kewajiban perpajakan Perusahaan untuk obligation for fiscal year 2020, as follows:
tahun fiskal 2020, sebagai berikut:
• Pajak pertambahan nilai sebesar • Value added tax at the amount of Rp
Rp 1.031.416.538, ditambah denda sebesar Rp 1,031,416,538, plus penalty of Rp 773,562,404.
773.562.404.
• Pajak penghasilan pasal 26 sebesar Rp 91.838.072.919, • Withholding tax article 26 at the amount of Rp
ditambah denda sebesar Rp 39.916.612.219. 91,838,072,919, plus penalty of Rp
39,916,612,219.
SKPKB terkait dengan pajak pertambahan nilai SKPKB related to value added tax was charged as
dibiayakan pada bulan Januari 2024. Perusahaan direct expense in January 2024. The Company has
sudah mebayar dan mengajukan keberatan atas paid and filed objection letter in regards with the
SKPKB pajak penghasilan pasal 26 dan mencatat SKPKB for withholding tax article 26 and accounted
jumlah yang dibayar sebagai klaim pengembalian the amount paid as claims for tax refund (Note 16).
pajak (Catatan 16)
- 156 -
Page 161
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
Tahun pajak 2019 Fiscal year 2019
Pada bulan April 2021, Perusahaan menerima In April 2021, the Company received several SKPKB
beberapa SKPKB dan surat tagihan pajak (STP) terkait and tax notice letter (STP) in regards with its tax
dengan kewajiban perpajakan Perusahaan untuk obligation for fiscal year 2019, as follows:
tahun fiskal 2019, sebagai berikut:
Jumlah yang Ekuivalen dalam US$/
Kurang bayar (termasuk diajukan oleh US$ equivalent
bunga dan denda)/ Perusahaan/ 30 September/
Keterangan pajak/ Tahun pajak/ Mata uang/ Underpayment (including Mata uang/ Amount Tanggapan Perusahaan/ September 30, 2024 dan/and
appealed by the 31 Desember/
Description of tax Fiscal year Currency interest and penalty) Currency Company Company 's response December 31 , 2023
Pajak penghasilan pasal 26/ 2019 Rp 129.208.145.925 Rp - Mengajukan keberatan / -
lncome tax article 26 File objection
SKPKB pajak pertambahan nilai/ 2019 Rp 12.594.801.834 Rp - Mengajukan keberatan/ -
SKPKB Value added tax File objection
-
Pada tahun 2022, Direktorat Jendral Pajak (“DJP”) In 2022, Directorate General of Taxation (“DGT”) has
menolak keberatan yang diajukan Perusahaan atas rejected the Company’s objection for the above taxes.
pajak tersebut di atas. Perusahaan membuat The Company provided full provision on its claim for
cadangan penuh atas klaim pengembalian pajaknya, tax refund, while at the same time also filed appeal
dan pada saat yang sama juga sudah mengajukan against DGT’s rejection.
banding atas penolakan DJP.
Tahun pajak 2018 dan 2017 Fiscal years 2018 and 2017
Pada bulan Februari 2021, Perusahaan menerima In February 2021, the Company received several
beberapa SKPKB terkait dengan kewajiban SKPKB in regards with its tax obligation for fiscal
perpajakan Perusahaan untuk tahun pajak 2017 dan years 2017 and 2018. From March 30, 2022, DGT has
2018. Sejak 30 Maret 2022, DJP telah menerbitkan also issued decision letters in response to the
surat keputusan sebagai tanggapan atas keberatan Company’s objection letters, which partially granted
yang disampaikan oleh Perusahaan, yang the Company’s objection, hence the new tax
mengabulkan sebagian keberatan yang disampaikan obligation including penalty and interest was
oleh Perusahaan sehingga kewajiban pajak yang baru decreased.
termasuk denda dan bunga turun.
Ekuivalen dalam US$/
Kurang bayar US$ equivalent
(term asuk bunga Jumlah yang 30 September/ Jumlah Kewajiban Pajak Baru Setelah
dan denda)/ diajukan oleh September 30, 2024 Tanggapan DJP atas Keberatan
Underpayment Perusahaan/ dan/and Perusahaan/
Keterangan pajak/ Tahun pajak/ Mata uang/ (including interest Mata uang/ Amount appealed Tanggapan Perusahaan/ 31 Desember/ New Tax Obligation after DGT’s
Description of tax Fiscal year Currency and penalty) Currency by the Company Company's response December 31 , 2023 Responses on the Company’s Objection
Pajak penghasilan badan/ 2017 US$ 498.315 US$ 3.461.798 Mengajukan keberatan / - US$ 209.082
Corporate income tax File objection Pengembalian pajak sebesar
Rp 3.681.677.982 (setara dengan
US$256.509 telah diterima sepenuhnya
oleh Perusahaan pada bulan Juni 2022/
The tax refund of Rp 3,681,677,982
(equivalent to US$256,509) has been
fully received by the Company in June
2022
Pajak penghasilan pasal 21/ 2017 Rp 40.868.479 Rp 40.868.479 Menerima ketetapan / -
lncome tax article 21 Agree with the assessment
Pajak penghasilan pasal 26/ *) 2017 Rp 553.574.780.751 Rp - Mengajukan keberatan / - Rp116.564.876.750
lncome tax article 26 File objection
Pajak pertambahan nilai/ 2017 Rp 5.456.950.274 Rp - Mengajukan keberatan/ - Rp2.660.477.523
Value added tax File objection Pengembalian pajak sebesar
Rp 2.796.472.750 telah diterima
sepenuhnya oleh Perusahaan pada bulan
April 2022/
The tax refund of Rp 2,796,472,750 has
been fully received by the Company in
April 2022
Pajak penghasilan badan/ 2018 US$ 1.712.903 US$ 462.750 Mengajukan keberatan/ - US$ 941.463
Corporate income tax File objection Pengembalian pajak sebesar Rp
11.236.792.126 (setara dengan
US$771.440 telah diterima sepenuhnya
oleh Perusahaan pada bulan Juni 2022/
The tax refund of Rp 11,236,792,126
(equivalent to US$771,440) has been
fully received by the Company in June
2022
Pajak penghasilan pasal 26/ 2018 Rp 140.016.331.149 Rp - Mengajukan keberatan/ - Menolak seluruh keberatan yang
Income tax article 26 File objection disampaikan Perusahaan/
Rejected all the Company’s objection
Pajak pertambahan nilai/ 2018 Rp 2.420.971.240 Rp - Mengajukan keberatan/ - Menolak seluruh keberatan yang
Value added tax File objection disampaikan Perusahaan/
Rejected all the Company’s objection
*) Dari jumlah keseluruhan yang ditetapkan oleh pajak sebesar Rp 553.574.780.751 (ekuivalen dengan US$ 38.448.033), Perusahaan membayar sebagian
ketetapan tersebut sebesar Rp 114.059.475.780 (ekuivalen dengan US$ 7.921.599) pada bulan Maret 2021 dan Rp 2.505.400.969 (ekuivalen dengan US$
174.101) pada bulan Juni 2021/
From the total assessment of Rp 553,574,780,751 (equivalent to US$ 38,448,033) made by tax office, the Company partly paid Rp 114,059,475,780
(equivalent to US$ 7,921,599) in March 2021 and Rp 2.505.400.969 (equivalent to US$ 174,101) in June 2021.
- 157 -
Page 162
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
Perusahaan kembali mengajukan banding terhadap The Company is again filing appeal against all
keputusan dan tanggapan DJP atas keberatan yang decisions and responses of DGT to the Company’s
diajukan oleh Perusahaan. objection.
Perusahaan membuat cadangan penuh atas klaim The Company provided full provision on its claim for
pengembalian pajaknya, dan pada saat yang sama tax refund, while at the same time also filed appeal
juga sudah mengajukan banding terhadap keputusan against all decisions and responses of DGT to the
dan tanggapan DJP atas keberatan yang diajukan oleh Company’s objection.
Perusahaan.
Pada tanggal 25 Januari 2024, Pengadilan Pajak telah On January 25, 2024, Tax Court has concluded for the
memutuskan kasus pajak pertambahan nilai (PPN) cases of the Company’s value added tax (VAT) for
Perusahaan untuk tahun pajak 2017 sampai dengan fiscal year 2017 until 2019 and has issued decision
2019 dan telah mengeluarkan surat keputusan letter dated February 5, 2024, stating that the
tertanggal 5 Februari 2024 yang menyatakan bahwa Company’s VAT underpayment for the three fiscal
kurang bayar PPN Perusahaan untuk ketiga tahun years amounted to Rp 15,449,068,854, as compared
pajak tersebut adalah Rp 15.449.068.854, to Rp 17,676,250,598 assessed by the directorate
dibandingkan dengan Rp 17.676.250.598 yang general of taxation (DGT) and paid by the Company.
ditetapkan oleh Direktorat Jenderal Pajak (DJP) dan
yang telah dibayar oleh Perusahaan.
Pada tanggal 1 Februari 2024, Pengadilan Pajak telah On February 1, 2024, Tax Court has concluded for the
memutuskan kasus pajak penghasilan pasal 26 (PPh) cases of the Company’s withholding tax article 26
Perusahaan untuk tahun pajak 2017 sampai dengan (WHT) for fiscal year 2017 until 2019 and has issued
2019 dan telah mengeluarkan surat keputusan decision letter dated February 13, 2024, stating that
tertanggal 13 Februari 2024 yang menyatakan bahwa the Company’s WHT underpayment for the three fiscal
kurang bayar PPh Perusahaan untuk ketiga tahun years amounted to Rp241,739,180,996, as compared
pajak tersebut adalah Rp241.739.180.996, to Rp385,789,353,823 assessed by the DGT and paid
dibandingkan dengan Rp385.789.353.823 yang by the Company.
ditetapkan oleh DJP dan yang telah dibayar oleh
Perusahaan.
Pada tanggal 1 Februari 2024, Pengadilan Pajak telah On February 1, 2024, Tax Court has concluded for the
memutuskan kasus pajak penghasilan badan (CITR) cases of the Company’s corporate income tax (CITR)
Perusahaan untuk tahun pajak 2017 sampai dengan for fiscal year 2017 until 2018 and has issued decision
2018 dan telah mengeluarkan surat keputusan letter dated February 13, 2024, stating that the
tertanggal 13 Februari 2024 yang menyatakan bahwa Company’s CITR overpayment for the two fiscal years
lebih bayar CITR Perusahaan untuk kedua tahun pajak amounted to US$ 654,624, as compared to tax
tersebut adalah US$ 654.624, dibandingkan dengan underpayment of US$ 1,150,545 assessed by the DGT
kurang bayar pajak sebesar US$ 1.150.545 yang and paid by the Company.
ditetapkan oleh DJP dan yang telah dibayar oleh
Perusahaan.
Pada bulan Maret 2024, Perusahaan telah menerima In March 2024, the Company has received all claims
seluruh klaim pengembalian pajak sesuai putusan for tax refund based on decision from Tax Court and
Pengadilan Pajak dan mencatat sebagai bagian dari recorded as part of others – net (Note 45).
lain-lain bersih (Catatan 45).
Pada tanggal 7 Mei 2024, Perusahaan melakukan On May 7, 2024, the Company filed appeal to
proses kasasi ke tingkat Mahkamah Agung terkait Supreme Tax Court in regards with the remaining
dengan sisa pajak penghasilan pasal 26 untuk tahun withholding tax article 26 for fiscal years 2017 until
pajak 2017 sampai 2019 yang belum disetujui oleh 2019 which were not approved by Tax Court
Pengadilan Pajak sebesar Rp241.514.206.428. amounting to Rp241,514,206,428.
KJA KJA
KJA telah menerima Surat Pemberitahuan Pajak KJA has received the following Notification of Tax Due
Terutang (“SPPT”), Surat Kurang Bayar Dana Hasil (“SPPT”), Underpayment of Coal Production Fund
Produksi Batubara (“DHPB”) dan Surat Tagihan Pajak (“DHPB”) and Tax Collection Letter (“STP”) on Land
(“STP”) atas Pajak Bumi dan Bangunan (“PBB”) and Building Tax (“PBB”):
sebagai berikut:
- 158 -
Page 163
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
Jumlah yang
ditetapkan
Tahun berdasarkan
Pajak/ SPPT/STP/ Jumlah yang
Fiscal Assessed amount dibayarkan/ Status pada tanggal laporan keuangan/
Year based on SPPT/STP Amount Paid Status as of date of financial report
2014 Rp 17.345.308.291 Rp 17.345.308.291 Pengadilan telah menyetujui tuntutan hukum yang di klaim oleh KJA
(SPPT) setara/ equivalent to setara/equivalent to pada tanggal 21 Nopember 2017. KJA telah menerima pengembalian
US$ 1,280,286 US$ 1,280,286 pajak atas SPPT PBB tahun 2014, 2010-2013 dan 2015 pada 17 Mei
2018. Jumlah yang diterima adalah sebesar US$1.518.047 setelah
dikompensasikan dengan Surat Ketetapan Pajak Kurang Bayar (SKPKB)
atas pajak penghasilan tahun 2013, Pajak Pertambahan Nilai (PPN)
bulan Desember 2013, Tagihan Pajak (STP) PPN bulan Desember 2013
dan 50% atas SPPT PBB 2016 dan 2017 sebesar US$ 1.897.321. Selisih
atas transaksi ini dibebankan pada laba rugi. Pada tanggal 6 Desember
2017, DJP mengajukan permohonan peninjauan kembali ke Mahkamah
Agung. Pada tanggal laporan keuangan ini, KJA menunggu keputusan
dari Mahkamah Agung./ Tax Court has approved the lawsuit claimed by
KJA on November 21, 2017. KJA has received the tax refund for SPPT
PBB period 2014, 2010-2013 and 2015 on May 17, 2018. The amount
received is US$ 1,518,047 after being compensated by the
Underpayment Assessment Letter of Corporate Income Tax (SKPKB) in
2013, Value Added Tax (PPN) in December 2013, Tax Collection Letter
(STP) of VAT in December 2013 and 50% of SPPT PBB period 2016 and
2017 amounting to US$ 1,897,321. The difference in this transaction
was charged to profit or loss. On December 6, 2017, DJP filed a judicial
review to the Supreme Court. As of the issuance date of the financial
statements, KJA is still awaiting a decision from the Supreme Court.
Pada tanggal 3 Juni 2024, KJA menerima Surat On June 3, 2024, KJA received Notice of Tax
Ketetapan Pajak terkait Pajak Bumi dan Bangunan Assessment related to its Land and Building Tax
(SKP) atas tahun pajak 2023 sebesar (NOA) for fiscal year 2023 amounting to
Rp355.872.802.250 (setara dengan Rp355,872,802,250 (equivalent to
US$21.727.383). SKP ini dicatat sebagai bagian dari US$21,727,383). Such NOA was recorded as part of
beban pokok kontrak dan penjualan (Catatan 41). cost of contracts and good sold (Note 41).
KJA telah melunasi SKP ini pada tanggal 2 Juli 2024. KJA settled the NOA on July 2, 2024.
REN REN
Pada tanggal 26 April 2024, REN mendapatkan Surat On April 26, 2024, REN received Overpayment
Ketetapan Pajak Lebih Bayar (SKPLB) terkait PPh 22 Assessment Letter (SKPLB) pertaining to Income Tax
tahun fiskal 2022 sebesar Rp 1.976.028.689 (setara art 22 for the fiscal year 2022 amounting to Rp
dengan US$ 130.232) seperti yang diminta. Namun, 1,976,028,689 (equivalent to US$ 130,232) as per
Perusahaan juga menerima Surat Ketetapan Pajak requested. Company also received Underpayment
Kurang Bayar (SKPKB) atas pajak PPh 22 masa Assessment Letters (SKPKB) for Income Tax art 22
Desember 2022, PPh 23 masa Desember 2022, dan December 2022, Income Tax art 23 December 2022,
PPN masa Agustus – September 2022. Sehingga nilai and VAT August – September 2022. So, SKPLB
SKPLB menjadi Rp 1.122.068.907 (setara dengan US$ amounting to Rp 1,122,068,907 (equivalent to US$
77.677). Penerimaan atas lebih bayar pajak tersebut 77,677). Incoming fund of the tax overpayment was
diterima pada tanggal 3 Mei 2024 received on May 3, 2024
IMI IMI
Direktorat Jenderal Pajak menerbitkan surat The Directorate General of Taxation issued
ketetapan pajak lebih bayar atas kewajiban pajak overpayment tax assessment letter on IMI’s corporate
badan IMI tahun 2022 dimana lebih bayar ditetapkan income tax obligation for fiscal year 2022 wherein
sebesar Rp766.201.149, dibandingkan dengan jumlah overpayment was assessed at Rp766,201,149, as
tercatat sebesar Rp766.201.149 (setara dengan compared to the recorded balance of Rp766,201,149
US$50.992). Akumulasi rugi fiskal IMI direvisi dari (equivalent to US$50,992). IMI’s accumulated fiscal
Rp32.020.029.433 menjadi Rp31.512.595.793 loss was revised from Rp32,020,029,433 to
karena perbedaan waktu pengakuan beban. Rp31,512,595,793 due to timing difference of
Pengembalian lebih bayar ini telah diterima oleh IMI expense recognition. Overpayment was received by
pada tanggal 29 Mei 2024. IMI on May 29, 2024.
- 159 -
Page 164
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
IMU IMU
Pada tanggal 11 Oktober 2024, IMU menerima Surat On October 11 2024, IMU received a Tax
Ketetapan Pajak Lebih Bayar dari DJP atas pajak Overpayment Assessment Letter from DGT for 2022
penghasilan badan tahun 2022 sebesar Rp corporate income tax amounting to Rp 2,243,144,939
2.243.144.939 (atau setara dengan US$ 148.180) (or the equivalent of US$ 148,180) and the refund is
dan saat ini sedang menunggu proses in process.
pengembaliannya.
ILSS ILSS
Pada Tanggal 27 Desember 2023, ILSS menerima On December 27, 2023, ILSS received Tax
Surat Ketetapan Pajak Kurang Bayar (SKPKB) dari Underpayment Assessment Letter (SKPKB) from
Direktorat Jenderal Pajak (DJP) atas Pajak Directorate General of Taxes (DGT) for its 2018
Penghasilan Badan tahun 2018 sebesar Rp Corporate Income Tax amounting to Rp
43.629.888.915 (setara dengan US$ 2.830.169). 43,629,888,915 (equivalent to US$ 2,830,169). ILSS
ILSS tidak setuju dengan hasilnya dan mengajukan disagreed with the result and submit the objection
keberatan pada tanggal 26 Maret 2024. Sampai letter on March 26, 2024. As of the issuance date of
dengan tanggal pelaporan keuangan konsolidasian ini these consolidated financial statements the objection
hasil keberatan masih belum diterima. results not yet determined.
GSI GSI
Pada bulan Juli 2024, DJP telah menyelesaikan audit In July 2024, DGT has completed audit of GSI’s tax
atas kewajiban perpajakan GSI untuk tahun pajak obligation for fiscal year 2022. Based on the
2022. Berdasarkan surat ketetapan yang diterbitkan assessment letters issued by DGT, GSI’s fiscal loss
oleh DJP, kerugian fiskal GSI terkoreksi dari was corrected from Rp20,595,515,497 to
Rp20.595.515.497 menjadi Rp19.011.752.751 dan Rp19,011,752,751 and overpayment of corporate
lebih bayar pajak badan ditetapkan sebesar income tax was assessed at Rp14,312,862,888
Rp14.312.862.888 (setara dengan US$ 870.748) (equivalent to US$ 870,748) (Note 16). DGT also
(Catatan 16). DJP juga melakukan koreksi sebesar made a correction of Rp72,399,283 (including interest
Rp72.399.283 (termasuk bunga dan denda) atas and penalty) over GSI’s value added tax.
pajak pertambahan nilai GSI.
Pengembalian dana telah diterima oleh GSI pada The refund was received by GSI on August 1, 2024.
tanggal 1 Agustus 2024.
48. LABA PER SAHAM 48. EARNINGS PER SHARE
Berikut ini data yang digunakan untuk perhitungan Below is the data used for the computation of basic
laba per saham dasar dan bersifat dilusian: and diluted earnings per share:
2024 2023
US$ US$
Laba periode berjalan yang dapat diatribusikan Profit for the period attributable to owners
kepada pemilik entitas induk 34.408.565 93.839.629 of the Company
Jumlah rata-rata tertimbang saham biasa untuk Weighted average number of ordinary shares for
tujuan laba per saham dasar 5.202.692.000 5.202.692.000 the purposes of basic earnings per share
Laba per saham (Nilai penuh) Saham dasar 0,0066 0,0180 Earning per share (Full amount) Basic
Perusahaan tidak memiliki potensi saham dilusian The Company has no potential dilutive ordinary
pada 2024 dan 2023. shares in 2024 and 2023.
- 160 -
Page 165
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
49. KATEGORI DAN KELAS INSTRUMEN KEUANGAN 49. CATEGORIES AND CLASSES OF FINANCIAL
INSTRUMENTS
Aset keuangan pada nilai
Aset keuangan pada
wajar melalui penghasilan
nilai wajar melalui Liabilitas keuangan pada
komprehensif lainnya/
Aset keuangan pada laporan laba rugi/ biaya perolehan yang
biaya perolehan yang Financial assets at fair Financial assets at fair value diamortisasi/
diamortisasi/ value through through other Financial liabilites at
Financial assets at profit or loss comprehensive income amortized Liabilitas sewa/ Instrumen majemuk/ Jumlah/
amortized cost (FVTPL) (FVTOCI) cost Lease liabilities Compound instrument Total
US$ US$ US$ US$ US$ US$ US$
30 September 2024 September 30, 2024
Aset Keuangan Lancar Current Financial Assets
Bank dan setara kas 701.331.750 - - - - - 701.331.750 Cash in Bank and cash equivalents
Aset keuangan lainnya 107.351.086 12.645.514 - - - - 119.996.600 Other financial assets
Piutang usaha Trade accounts receivable
Pihak berelasi 81.693.854 - - - - - 81.693.854 Related parties
Pihak ketiga 304.886.713 - - - - - 304.886.713 Third parties
Piutang lain-lain - jatuh tempo Other accounts receivable -
dalam satu tahun current maturities
Pihak ketiga 31.796.514 - - - - - 31.796.514 Third parties
Piutang dividen 2.760.000 - - - - - 2.760.000 Dividend receivable
Aset lancar lainnya - - - - - 16.464.583 16.464.583 Other current assets
Deposit 43.370 - - - - - 43.370 Deposits
Aset Keuangan Tidak Lancar Non-current Financial Assets
Aset keuangan tidak lancar lainnya 71.458.584 - - - - - 71.458.584 Other noncurrent financial assets
Piutang lain-lain - setelah dikurangi bagian Other accounts receivable - net of
jatuh tempo dalam satu tahun current maturities
Pihak berelasi 17.864.282 - - - - - 17.864.282 Related parties
Pihak ketiga 5.311.904 - - - - - 5.311.904 Third parties
Investasi saham - - 24.665.637 - - - 24.665.637 Investment in shares of stock
Uang jaminan 2.976.238 - - - - - 2.976.238 Refundable deposits
Liabilitas Keuangan Jangka Pendek Current Financial Liabilities
Pinjaman jangka pendek - - - 71.103.748 - - 71.103.748 Short-term loans
Utang usaha Trade accounts payable
Pihak berelasi - - - 5.138.049 - - 5.138.049 Related party
Pihak ketiga - - - 296.512.995 - - 296.512.995 Third parties
Utang lain-lain kepada pihak ketiga dan Other accounts payable to third parties
biaya yang masih harus dibayar - - - 130.615.020 130.615.020 and accrued expenses
Utang dividen - - - 4.049.975 - - 4.049.975 Dividends payable
Liabilitas jangka panjang - jatuh tempo Current maturities of
dalam satu tahun long-term liabilities
Pinjaman jangka panjang - - - 46.408.668 - - 46.408.668 Long-term loans
Liabilitas sewa - - - - 9.063.499 - 9.063.499 Lease liabilities
Utang obligasi - bersih - - - 226.157.281 - - 226.157.281 Bonds payable - net
Liabilitas Keuangan Jangka Panjang Non-current Financial Liabilities
Liabilitas jangka panjang - setelah dikurangi Long-term liabilities - net of
bagian jatuh tempo dalam satu tahun current maturities
Pinjaman jangka panjang long-term loans
Pihak ketiga - - - 459.910.651 - - 459.910.651 Third parties
Pihak berelasi - - - 1.294.782 - - 1.294.782 Related party
Pinjaman yang dapat dikonversikan - - - - - 21.906.240 21.906.240 Convertible loan
Liabilitas sewa - - - - 4.151.157 - 4.151.157 Lease liabilities
Utang obligasi - bersih - - - 449.034.279 - - 449.034.279 Bonds payable - net
Utang jangka panjang lainnya - pihak ketiga - - - 1.950.294 - - 1.950.294 Other long-term liability - third party
Provisi rehabilitasi tambang, penutupan Provision for mine rehabilitation,
tambang dan pembongkaran - - - 44.165.139 - - 44.165.139 mine closure and decommissioning
Jumlah 1.327.474.295 12.645.514 24.665.637 1.736.340.881 13.214.656 38.370.823 3.152.711.806 Total
Aset keuangan pada Instrumen derivatif
Aset keuangan pada nilai
nilai wajar melalui Liabilitas keuangan pada pada arus kas
wajar melalui penghasilan
Aset keuangan pada laporan laba rugi/ biaya perolehan yang lindung nilai/
komprehensif lainnya/
biaya perolehan yang Financial assets at fair diamortisasi/ Derivatives designated
Financial assets at fair
diamortisasi/ value through value through other Financial liabilites at as hedge instrument
Financial assets at profit or loss comprehensive income amortized under Liabilitas sewa/ Instrumen majemuk/ Jumlah/
amortized cost (FVTPL) (FVTOCI) cost Cash flow hedge Lease liabilities Compound instrument Total
US$ US$ US$ US$ US$ US$ US$ US$
31 Desember 2023 December 31, 2023
Aset Keuangan Lancar Current Financial Assets
Bank dan setara kas 446.212.952 - - - - - - 446.212.952 Cash in Bank and cash equivalents
Aset keuangan lainnya 120.756.318 12.898.157 - - - - - 133.654.475 Other financial assets
Piutang usaha Trade accounts receivable
Pihak berelasi 80.612.755 - - - - - - 80.612.755 Related parties
Pihak ketiga 262.997.390 - - - - - - 262.997.390 Third parties
Piutang lain-lain - jatuh tempo Other accounts receivable -
dalam satu tahun current maturities
Pihak ketiga 32.372.076 - - - - - - 32.372.076 Third parties
Aset derivatif - - - - 689.188 - - 689.188 Derivative assets
Aset lancar lainnya - - - - - - 12.644.052 12.644.052 Other current assets
Deposit 1.833.888 - - - - - - 1.833.888 Deposits
Aset Keuangan Tidak Lancar Non-current Financial Assets
Aset keuangan tidak lancar lainnya 113.457.446 - - - - - - 113.457.446 Other noncurrent financial assets
Piutang lain-lain - setelah dikurangi bagian Other accounts receivable - net of
jatuh tempo dalam satu tahun current maturities
Pihak berelasi 20.375.957 - - - - - - 20.375.957 Related parties
Pihak ketiga 5.078.780 - - - - - - 5.078.780 Third parties
Investasi saham - - 27.143.932 - - - - 27.143.932 Investment in shares of stock
Uang jaminan 2.489.197 - - - - - - 2.489.197 Refundable deposits
Liabilitas Keuangan Jangka Pendek Current Financial Liabilities
Pinjaman jangka pendek - - - 58.409.213 - - - 58.409.213 Short-term loans
Utang usaha Trade accounts payable
Pihak berelasi - - - 4.077.079 - - - 4.077.079 Related party
Pihak ketiga - - - 273.893.283 - - - 273.893.283 Third parties
Utang lain-lain kepada pihak ketiga - - - 52.992.973 - - - 52.992.973 Other accounts payable to third parties
Biaya masih harus dibayar - - - 133.480.871 - - - 133.480.871 Accrued expenses
Utang dividen - - - 10.743 - - - 10.743 Dividends payable
Liabilitas jangka panjang - jatuh tempo Current maturities of
dalam satu tahun long-term liabilities
Pinjaman jangka panjang - - - 58.297.225 - - - 58.297.225 Long-term loans
Liabilitas sewa - - - - - 7.870.164 - 7.870.164 Lease liabilities
Utang obligasi - bersih - - - 304.359.120 - - - 304.359.120 Bonds payable - net
Liabilitas Keuangan Jangka Panjang Non-current Financial Liabilities
Liabilitas jangka panjang - setelah dikurangi Long-term liabilities - net of
bagian jatuh tempo dalam satu tahun current maturities
Pinjaman jangka panjang long-term loans
Pihak ketiga - - - 104.275.570 - - - 104.275.570 Third parties
Pihak berelasi - - - 1.253.300 - - - 1.253.300 Related party
Pinjaman yang dapat dikonversikan - - - - - - 20.092.531 20.092.531 Convertible loan
Liabilitas sewa - - - - - 8.450.249 - 8.450.249 Lease liabilities
Utang obligasi - bersih - - - 528.922.780 - - - 528.922.780 Bonds payable - net
Utang jangka panjang lainnya - pihak ketiga - - - 439.668 - - - 439.668 Utang jangka panjang lainnya - pihak ketiga
Provisi rehabilitasi tambang, penutupan Provision for mine rehabilitation,
tambang dan pembongkaran - - - 43.265.139 - - - 43.265.139 mine closure and decommissioning
Jumlah 1.086.186.759 12.898.157 27.143.932 1.563.676.964 689.188 16.320.413 32.736.583 2.739.651.996 Total
- 161 -
Page 166
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
50. MANAJEMEN RISIKO KEUANGAN DAN MODAL 50. FINANCIAL RISK AND CAPITAL MANAGEMENT
a. Tujuan dan kebijakan manajemen risiko a. Financial risk management objectives and
keuangan policies
Tujuan dan kebijakan manajemen risiko keuangan The Group’s overall financial risk management and
Grup adalah untuk memastikan bahwa sumber policies seek to ensure that adequate financial
daya keuangan yang memadai tersedia untuk resources are available for the operation and
operasi dan pengembangan bisnis, serta untuk development of their business, while managing
mengelola risiko mata uang asing, tingkat bunga, their exposure to foreign currency risk, interest
risiko harga, kredit dan risiko likuiditas. Grup rate risk, price risk, credit and liquidity risks. The
beroperasi dengan pedoman yang telah Groups operate within defined guidelines that
ditentukan oleh Direksi. were approved by Directors.
i. Manajemen risiko mata uang asing i. Foreign currency risk management
Mata uang fungsional Grup adalah Dollar The Group functional currency is U.S. Dollar.
Amerika Serikat. Grup melakukan transaksi The Group undertakes transactions
dalam mata uang asing; oleh karena itu timbul denominated in foreign currencies;
eksposur terhadap fluktuasi kurs mata asing. consequently, exposures to exchange rate
fluctuations arise.
Rincian aset dan liabilitas moneter dalam mata Details of monetary assets and liabilities
uang asing diungkapkan dalam Catatan 55. denominated in foreign currencies are
disclosed in Note 55.
Analisis sensitivitas mata uang asing Foreign currency sensitivity analysis
Sensitivitas Grup terhadap mata uang asing The Group sensitivity against the relevant
adalah 3% pada 30 September 2024 foreign currencies is 3% on September 30,
(2023: 2%). Jika Dollar Amerika Serikat 2024 (2023: 2%). Had the U.S. Dollar
melemah/menguat masing-masing 3% pada 30 weakened/strengthened by 3% September 30,
September 2024 (2023: 2%), dengan seluruh 2024 (2023: 2%), with all other variables held
variabel konstan lainnya, laba bersih setelah constant, profit after tax for for the nine-month
pajak untuk periode sembilan bulan berakhir period then ended September 30, 2024 would
pada 30 September 2024 akan turun/naik decrease/increase US$ 1,106,977 (2023:
sebesar US$ 1.106.977 (2023: US$ 4.168.116). US$ 4,168,116). 3% as at September 30,
3% pada tanggal 30 September 2024 (2023: 2024 (2023: 2%) are the sensitivity rates used
2%) adalah tingkat sensitivitas yang digunakan when reporting foreign currency risk internally
ketika melaporkan secara internal risiko mata to key management personnel and represents
uang asing kepada para manajemen kunci, dan management’s assessment of the reasonably
merupakan penilaian manajemen terhadap possible change in foreign exchange rates. The
perubahan yang mungkin terjadi pada nilai tukar sensitivity analysis includes only outstanding
valuta asing. Analisis sensitivitas hanya monetary items denominated in currencies
mencakup saldo moneter yang ada dalam mata other than U.S. Dollar.
uang selain Dollar Amerika Serikat.
Menurut pendapat manajemen, analisis The management believes that the sensitivity
sensitivitas tidak mewakili dari risiko nilai analysis is unrepresentative of the inherent
tukar valuta asing karena eksposur pada akhir foreign currency risk because the exposure at
periode pelaporan tidak mencerminkan the end of the reporting period does not reflect
eksposur selama periode berjalan. the exposure during the period.
ii. Manajemen risiko tingkat suku bunga ii. Interest rate risk management
Eksposur risiko tingkat bunga berhubungan The interest rate risk exposure relates to the
dengan jumlah aset atau liabilitas dimana amount of assets or liabilities which are
pergerakan pada tingkat suku bunga dapat subject to a risk that a movement in interest
mempengaruhi laba setelah pajak. Risiko pada rates will adversely affect the profit after tax.
pendapatan bunga bersifat terbatas karena The risk on interest income is limited as the
Grup hanya bermaksud untuk menjaga saldo Group only intends to keep sufficient cash
- 162 -
Page 167
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
kas yang cukup untuk memenuhi kebutuhan balances to meet operational needs. On
operasional. Dari sisi beban bunga, mayoritas interest expenses, majority of the Group debt
Grup adalah instrumen bunga tetap. Ada are fixed rate instruments. The Group
kalanya, Grup meminjam dengan suku bunga sometimes borrows at variable rates and uses
mengambang dan menggunakan interest rate interest rate swaps as cash flow hedges of
swap sebagai lindung nilai arus kas atas future interest payments, which have the
pembayaran bunga di masa depan, dimana economic effect of converting borrowings
mengubah pinjaman dari suku bunga from floating rates to fixed rates. The interest
mengambang menjadi suku bunga tetap akan rate swaps allow the Group to raise long-term
memberikan manfaat ekonomis. Interest rate borrowings at floating rates and swap them
swap memungkinkan Grup untuk into fixed rates that are lower than those
mendapatkan pinjaman jangka panjang available if the Group borrowed at fixed rates
dengan suku bunga mengambang dan directly. Under the interest rate swaps, the
merubahnya menjadi suku bunga tetap yang group agrees with other parties to exchange,
lebih rendah dibandingkan jika Grup at specified intervals, the difference between
meminjam langsung dengan suku bunga fixed contract rates and floating rate interest
tetap. Dengan interest rate swap, Grup setuju amounts calculated by reference to the
dengan pihak ketiga untuk menukar pada agreed notional principal amounts. Further
interval tertentu selisih antara kontrak bunga details of the interest rate swaps can be found
tetap dan mengambang yang dihitung in Note 26. Approvals from Directors and
berdasarkan jumlah notional yang disepakati. Commissioners as well as Treasury
Penjelasan lebih lanjut tentang interest rate Committee must be obtained before
swap dapat dilihat pada Catatan 26. committing the Group to any of the
Persetujuan dari Direksi dan Komisaris serta instruments to manage the interest rate risk
Komite Treasury harus diperoleh sebelum exposure.
Grup menggunakan instrumen keuangan
tersebut untuk mengelola eksposur risiko suku
bunga.
Analisis sensitivitas telah ditentukan The sensitivity analysis have been determined
berdasarkan paparan suku bunga untuk based on the exposure to interest rates for
instrumen non derivatif pada akhir periode non-derivative instruments at the end of the
pelaporan. Untuk liabilitas tingkat bunga reporting period. For floating rate liabilities,
mengambang, analisis tersebut disusun the analysis is prepared assuming the amount
dengan asumsi jumlah liabilitas terutang pada of the liability outstanding at the end of the
akhir periode pelaporan itu terutang sepanjang reporting period was outstanding for the
tahun. Kenaikan atau penurunan 50 basis poin whole period. A 50 basis point increase or
digunakan ketika melaporkan risiko suku decrease is used when reporting interest rate
bunga secara internal kepada manajemen risk internally to key management personnel
kunci dan merupakan penilaian manajemen and represents management’s assessment of
terhadap perubahan yang mungkin terjadi the reasonably possible change in interest
pada suku bunga. rates.
Jika suku bunga telah lebih tinggi/rendah If interest rates had been 50 basis points
50 basis poin dan semua variabel lainnya tetap higher/lower and all other variables were held
konstan, laba Grup untuk periode sembilan constant, the Group’s profit for for the nine-
bulan berakhir pada 30 September 2024 akan month period then ended September 30, 2024
turun/naik sebesar US$ 933.759 (31 would decrease/ increase by US$ 933,759
Desember 2023: US$ 874.823). Hal ini (December 31, 2023: US$ 874,823). This is
terutama disebabkan oleh eksposur Grup mainly attributable to the Group exposure to
terhadap suku bunga atas pinjamannya interest rates on its variable rate borrowings.
dengan suku bunga variabel.
Eksposur risiko tingkat bunga Grup pada aset The Group exposure to interest rates on
keuangan dan liabilitas keuangan dijelaskan financial assets and financial liabilities are
dalam tabel risiko likuiditas. detailed in the liquidity risk table.
iii. Manajemen risiko harga iii. Price risks management
Grup terekspos pada risiko harga saham yang The Group are exposed to equity price risks
timbul dari investasi ekuitas. Investasi ekuitas arising from equity investments. Equity
lebih ditujukan untuk tujuan strategis dari investments are held for strategic rather than
pada untuk tujuan perdagangan. Grup tidak trading purposes. The Group do not actively
aktif memperdagangkan investasi ini. trade these investments.
- 163 -
Page 168
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
Grup menghadapi risiko harga komoditas The Group face commodity price risk because
karena batubara adalah suatu komoditas yang coal is a commodity product traded in world
diperdagangkan di pasar dunia. Harga coal markets. Prices for coal are generally
batubara pada umumnya mengikuti indeks based on international coal indices as
harga internasional, yang cenderung benchmarks, which tend to be highly cyclical
mengalami fluktuasi yang signifikan. Sebagai and subject to significant fluctuations. As a
produk komoditas, harga global batubara pada commodity product, global coal prices are
prinsipnya tergantung pada tingkat principally dependent on the supply and
permintaan dan penawaran pada pasar ekspor demand dynamics of coal in the world export
dunia. Grup belum mengadakan perjanjian market. The Group have not entered into coal
untuk melindungi eksposur fluktuasi harga pricing agreements to hedge its exposure to
batubara tetapi mungkin melakukannya pada fluctuations in the coal price but may do so in
masa yang akan datang. Namun, untuk the future. However, in order to minimize the
meminimalisasi risiko, harga batubara risk, coal prices are negotiated and agreed
dinegosiasi dan disepakati setiap tahunnya every year with customer.
dengan pelanggan.
iv. Manajemen risiko kredit iv. Credit risk management
Grup mengembangkan dan mengelola The Group develops and maintains its credit
peringkat risiko kredit untuk mengkategorikan risk gradings to categorize exposures
eksposur sesuai dengan tingkat risiko gagal according to their degree of risk of default. The
bayar. Grup menggunakan catatan Group uses its own trading records to rate its
perdagangannya sendiri untuk memeringkat major customers and other debtors.
pelanggan utama dan debitur lainnya.
Kerangka peringkat risiko kredit kini Grup The Group current credit risk grading
terdiri dari kategori berikut: framework comprises the following categories:
Kategori/ Dasar pengakuan ECL/
Category Deskripsi/Description Basis for recognizing ECL
Lancar/ Pihak lawan memiliki risiko gagal bayar yang ECL 12 bulan/
Performing rendah dan tidak memiliki tunggakan./ 12-month ECL
The counterparty has a low risk of default and does
not have any past-due amounts.
Dicadangkan/ Jumlah yang tertunggak > 30 hari atau telah ada ECL sepanjang umur – kredit
Doubtful peningkatan risiko kredit yang signifikan sejak tidak memburuk/
pengakuan awal./ Lifetime ECL – not credit-
Amount is >30 days past due or there has been a impaired
significant increase in credit risk since initial
recognition.
Gagal bayar/ Jumlah yang tertunggak > 90 hari atau ada bukti ECL sepanjang umur – kredit
In default yang mengindikasikan aset mengalami penurunan memburuk/
nilai kredit./ Lifetime ECL – credit-impaired
Amount is >90 days past due or there is evidence
indicating the asset is credit-impaired.
Penghapusan/ Ada bukti yang mengindikasikan bahwa debitur Saldo dihapuskan/
Write-off dalam kesulitan keuangan yang buruk dan Amount is written off
Perusahaan tidak memiliki prospek pemulihan yang
realistis./
There is evidence indicating that the debtor is in
severe financial difficulty and the Company has no
realistic prospect of recovery.
- 164 -
Page 169
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
Grup telah mengadopsi prosedur dalam The Group has adopted procedures in
memperluas persyaratan kredit kepada extending credit terms to customers and in
pelanggan dan dalam memantau risiko monitoring its credit risk. The Group only
kreditnya. Grup hanya memberikan kredit grants credit to creditworthy counterparties.
kepada pihak lawan yang layak kredit. Kas Cash is held with creditworthy institutions and
ditempatkan pada lembaga yang layak kredit is subject to immaterial credit loss.
dan memiliki kerugian kredit yang tidak
material.
Meskipun eksposur kredit Grup terkonsentrasi Although the Group’s credit exposure is
terutama di Indonesia, tidak terdapat concentrated mainly in Indonesia, it has no
konsentrasi risiko kredit signifikan pada significant concentration of credit risk with any
pelanggan atau kelompok pelanggan tertentu. single customer or group of customers.
Rincian lebih lanjut dari risiko kredit pada Further details of credit risks on trade and
piutang usaha dan piutang lainnya dan aset other accounts receivable and contract assets
kontrak diungkapkan masing-masing pada are disclosed in Notes 7, 8 and 9.
Catatan 7, 8 dan 9.
v. Manajemen risiko likuiditas v. Liquidity risk management
Tanggung jawab utama untuk manajemen Ultimate responsibility for liquidity risk
risiko likuiditas bertumpu pada Direksi yang management rests with Directors, which have
telah membangun kerangka manajemen risiko built an appropriate liquidity risk management
likuiditas yang sesuai untuk manajemen framework for the management of the Group
likuiditas dan pendanaan jangka pendek, short, medium and long-term funding and
menengah dan jangka panjang. Grup liquidity management requirements. The
mengelola risiko likuiditas dengan menjaga Group manage liquidity risk by maintaining
kecukupan simpanan, fasilitas bank dan adequate reserves, banking facilities and
cadangan fasilitas pinjaman dengan terus reserve borrowing facilities by continuously
menerus memonitor perkiraan dan arus kas monitoring forecast and actual cash flows and
aktual dan menyesuaikan profil jatuh tempo matching the maturity profiles of financial
aset dan liabilitas keuangan. assets and liabilities.
Grup menjaga kecukupan dana untuk The Group maintains sufficient funds to
membiayai kebutuhan modal kerja, dimana finance ongoing working capital requirements,
dana tersebut ditempatkan dalam bentuk kas whereas the funds are placed in cash and
dan deposito serta dividen kas yang diterima deposit and cash dividend is also received
setiap tahunnya. every year.
Tabel risiko likuiditas dan suku bunga Liquidity and interest rate risk tables
Tabel berikut merinci sisa jangka kontrak Grup The following tables detail the Group
untuk liabilitas keuangan non-derivatif dengan remaining contractual maturity for non-
periode pembayaran yang disepakati. Tabel derivative financial liabilities with agreed
telah dibuat berdasarkan arus kas terdiskonto repayment periods. The tables have been
liabilitas keuangan berdasarkan tanggal paling drawn up based on the undiscounted cash
awal dimana Grup dapat diminta untuk flows of financial liabilities based on the
membayar. Tabel mencakup bunga dan arus earliest date on which the Group can be
kas utama. Untuk liabilitas dengan suku bunga required to pay. The tables include both
mengambang, jumlah tak terdiskonto interest and principal cash flows. To the
ditentukan dari kurva suku bunga pada akhir extent that interest flows are floating rate, the
periode pelaporan. Jatuh tempo kontrak undiscounted amount is derived from interest
didasarkan pada tanggal yang paling awal di rate curves at the end of the reporting period.
mana Grup dapat diminta untuk membayar. The contractual maturity is based on the
earliest date on which the Group may be
required to pay.
- 165 -
Page 170
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
Tingkat bunga
rata-rata
tertimbang
efektif/ Kurang dari > 3 bulan
Weighted average 1 bulan/ sampai 1 tahun/
effective Less than 1-3 bulan/ > 3 months > 1-5 tahun/
interest rate 1 month 1-3 months to 1 year > 1-5 years Jumlah/Total
% US$ US$ US$ US$ US$
30 September 2024 September 30, 2024
Tanpa bunga Non-interest bearing
Utang usaha 289.832.508 11.213.391 268.559 336.586 301.651.044 Trade accounts payable
Utang lain-lain kepada pihak ketiga Other accounts payable to third parties
dan biaya yang masih harus dibayar - - 130.615.020 - 130.615.020 and accrued expenses
Utang dividen 4.049.975 - - - 4.049.975 Dividen Payable
Provisi rehabilitasi tambang,
penutupan tambang dan Provision for mine rehabilitation,
pembongkaran - - - 44.165.139 44.165.139 mine closure and decommissioning
Instrumen suku bunga variabel Variable interest rate instruments
Pinjaman Jangka pendek 1,50% - 8,00% - - 76.792.048 - 76.792.048 Short-term loans
Pinjaman Jangka panjang 5,75% - 6,00% - - 49.193.188 599.567.063 648.760.251 Long-term loans
Liabilitas sewa 2,05%-2,70% - - 9.063.499 4.151.157 13.214.656 Lease liabilities
-
Instrumen suku bunga tetap - Fixed interest rate instruments
Pinjaman yang dapat dikonversikan 1.00% - - - 22.125.302 22.125.302 Convertible loan
Utang Obligasi 5.88%-8.75% - 227.806.345 - 606.196.277 834.002.622 Bonds payable
Jumlah 293.882.483 239.019.736 265.932.314 1.276.541.524 2.075.376.057 Total
Tingkat bunga
rata-rata
tertimbang
efektif/ Kurang dari > 3 bulan
Weighted average 1 bulan/ sampai 1 tahun/
effective Less than 1-3 bulan/ > 3 months > 1-5 tahun/
interest rate 1 month 1-3 months to 1 year > 1-5 years Jumlah/Total
% US$ US$ US$ US$ US$
31 Desember 2023 December 31, 2023
Tanpa bunga Non-interest bearing
Utang usaha 263.981.904 12.166.535 1.189.948 631.975 277.970.362 Trade accounts payable
Utang lain-lain kepada pihak ketiga - - 52.992.973 - 52.992.973 Other accounts payable to third parties
Biaya masih harus dibayar 133.480.871 - - - 133.480.871 Accrued expenses
Utang dividen 10.743 - - - 10.743 Dividends Payable
Provisi rehabilitasi tambang,
penutupan tambang dan Provision for mine rehabilitation,
pembongkaran - - - 43.265.139 43.265.139 mine closure and decommissioning
Instrumen suku bunga variabel Variable interest rate instruments
Pinjaman Jangka pendek 1,50% - 8,00% 11.800.937 15.299.621 35.482.625 - 62.583.183 Short-term loans
Pinjaman Jangka panjang 5,75% - 7,89% 11.128.626 22.257.252 55.159.329 112.568.679 201.113.886 Long-term loans
Liabilitas sewa 2,05%-2,70% - - 7.870.164 8.450.249 16.320.413 Lease liabilities
Instrumen suku bunga tetap Fixed interest rate instruments
Pinjaman yang dapat dikonversikan 1,00% - - - 20.293.456 20.293.456 Convertible loan
Utang Obligasi 5,88% - 8,25% - - 304.359.120 528.922.780 833.281.900 Bonds payable
Jumlah 420.403.081 49.723.408 457.054.159 714.132.278 1.641.312.926 Total
Tabel berikut merinci estimasi jatuh tempo The following table details the Group expected
instrumen keuangan non-derivatif Grup. Tabel maturity for non-derivative financial assets.
tersebut telah disusun berdasarkan jatuh The table has been drawn up based on the
tempo kontrak terdiskonto dari aset keuangan undiscounted contractual maturities of the
termasuk bunga yang akan diperoleh dari aset financial assets including interest that will be
tersebut. Dimasukkannya informasi aset earned on those assets. The inclusion of
keuangan non-derivatif diperlukan untuk information on non-derivative financial assets
memahami manajemen risiko likuiditas Grup is necessary in order to understand the Group
sebagaimana likuiditas dikelola berdasarkan liquidity risk management as the liquidity is
aset dan liabilitas bersih. managed on a net asset and liability basis.
Tingkat bunga
rata-rata
tertimbang efektif/ Kurang dari 3 bulan Lebih dari
Weighted average 1 bulan/ sampai 1 tahun/ 5 tahun/
effective Less than 1-3 bulan/ 3 months 1-5 tahun/ More than
interest rate 1 month 1-3 months to 1 year 1-5 years 5 years Jumlah/Total
% US$ US$ US$ US$ US$ US$
30 September 2024 September 30, 2024
Tanpa bunga Non-interest bearing
Kas 5.015.044 - - - - 5.015.044 Cash on hand
Aset keuangan lainnya - - 12.645.514 - - 12.645.514 Other financial assets
Piutang usaha 286.721.787 74.408.672 25.450.108 - - 386.580.567 Trade accounts receivable
Piutang dividen - 2.760.000 - - - 2.760.000 Dividend receivable
Deposit - - - 43.370 - 43.370 Deposits
Uang muka dan aset tidak Advance and other non-current
lancar lainnya - - - 54.540.521 - 54.540.521 assets
Uang jaminan - - - 2.976.238 2.976.238 Refundable deposits
Instrumen tingkat bunga variabel Variable interest rate instruments
Bank 0,01% - 2,70% 356.060.256 - - - - 356.060.256 Cash in bank
Aset keuangan lainnya 0,2% - 3,00% - 105.990.094 - 82.177.372 - 188.167.466 Other financial assets
Instrumen tingkat bunga tetap Fixed interest rate instruments
Deposito berjangka 1,00% - 6,75% - 351.399.423 - - - 351.399.423 Time deposits
Aset keuangan lainnya 8,57% - - - 2.150.000 2.150.000 Other financial asset
Jumlah 647.797.087 534.558.189 38.095.622 141.887.501 - 1.362.338.399 Total
- 166 -
Page 171
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
Tingkat bunga
rata-rata
tertimbang efektif/ Kurang dari 3 bulan
Weighted average 1 bulan/ sampai 1 tahun/
effective Less than 1-3 bulan/ 3 months 1-5 tahun/
interest rate 1 month 1-3 months to 1 year 1-5 years Jumlah/Total
% US$ US$ US$ US$ US$
31 Desember 2023 December 31, 2023
Tanpa bunga Non-interest bearing
Kas 2.991.468 - - - 2.991.468 Cash on hand
Aset keuangan lainnya - - 12.898.157 43.465.509 56.363.666 Other financial assets
Piutang usaha 316.440.488 7.254.254 19.915.403 - 343.610.145 Trade accounts receivable
Deposit - - - 1.833.888 1.833.888 Deposits
Piutang lain-lain - - - - - Other accounts receivable
Uang muka dan aset tidak Advance and other non-current
lancar lainnya - - - 46.316.927 46.316.927 assets
Uang jaminan - - - 2.489.197 2.489.197 Refundable deposits
Instrumen tingkat bunga variabel Variable interest rate instruments
Bank 0,25% - 3,00% 369.367.564 - - - 369.367.564 Cash in bank
Aset keuangan lainnya 0,06% - 0,6% - 118.606.318 69.991.937 - 188.598.255 Other financial assets
Instrumen tingkat bunga tetap Fixed interest rate instruments
Piutang lain-lain 4 - 7% - - - - - Other accounts receivable
Deposito berjangka 0,06% - 3,60% - 76.845.388 - - 76.845.388 Time deposits
Aset keuangan lainnya 8,57% - - 2.150.000 - 2.150.000 Other financial asset
Jumlah 688.799.520 202.705.960 104.955.497 94.105.521 1.090.566.498 Total
b. Manajemen modal b. Capital management
Grup mengelola modalnya untuk memastikan The Group manage their capital to ensure that
mereka dapat mempertahankan kelangsungan they will be able to continue as a going concern
usaha disamping memaksimalkan pengembalian while maximizing the return to shareholders
kepada pemegang saham melalui optimalisasi through the optimization of the debt and equity
saldo utang dan ekuitas. Strategi Grup tetap tidak balance. The Group’s strategy remains unchanges
berubah di 2022. in 2022.
Struktur modal Grup terdiri dari utang termasuk The capital structure of the Group consists of debt,
pinjaman yang diungkapkan dalam Catatan 27, which includes the borrowings disclosed in
31, 32, 33 dan 34, kas dan setara kas Notes 27, 31, 32, 33 and 34, cash and cash
(Catatan 5), investasi pada pihak ketiga, deposito equivalents (Note 5), investment in third parties,
berjangka (Catatan 6) dan modal tersedia bagi time deposit (Note 6) and equity attributable to
para pemegang saham dari induk perusahaan, owners of the Company, comprising of issued
terdiri dari modal saham (Catatan 37), tambahan capital (Note 37), additional paid-in capital (Note
modal disetor (Catatan 38), saldo laba dan 38), retained earnings and other components of
komponen ekuitas lainnya. equity.
Gearing ratio adalah sebagai berikut: The gearing ratio are as follows:
30 September/ 31 Desember/
September 30, December 31,
2024 2023
US US
Pinjaman Debt
Pinjaman jangka pendek 71.103.748 58.409.213 Short-term loans
Pinjaman jangka panjang 507.614.101 163.826.095 Long-term loans
Pinjaman yang dapat dikonversikan 21.906.240 20.092.531 Convertible loan
Liabilitas sewa 13.214.656 16.320.413 Lease liabilities
Utang obligasi - bersih 675.191.560 833.281.900 Bonds payable - net
Jumlah pinjaman 1.289.030.305 1.091.930.152 Total debt
Kas dan setara kas 706.346.794 449.204.420 Cash and cash equivalents
Aset keuangan lainnya 191.455.184 247.111.921 Other financial assets
Kas - bersih 391.228.327 395.613.811 Cash - net
Ekuitas 1.370.148.746 1.377.137.450 Equity
Rasio pinjaman bersih terhadap modal 29% 29% Net debt to equity ratio
- 167 -
Page 172
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
51. PENGUKURAN NILAI WAJAR 51. FAIR VALUE MEASUREMENTS
Nilai wajar instrumen keuangan yang dicatat pada Fair value of financial instruments carried at
biaya perolehan amortisasi amortized cost
Kecuali disebutkan pada tabel berikut ini, manajemen Except as detailed in the following table, management
berpendapat bahwa nilai tercatat aset dan liabilitas considers that the carrying amounts of financial
keuangan yang dicatat dalam laporan keuangan assets and financial liabilities recorded in the
konsolidasian mendekati nilai wajarnya baik karena consolidated financial statements approximate their
mempunyai jangka waktu pendek atau yang berlaku fair values because they have either short-term
menggunakan tingkat suku bunga pasar: maturities or carry market interest rate:
30 September/September 30, 2024 Tingkatan 31 Desember/December 31, 2023
Nilai tercatat/ Nilai wajar/ hiriarki/ Nilai tercatat/ Nilai wajar/
Carrying amount Fair value Hierarchy level Carrying amount Fair value
US$ US$ US$ US$
Utang obligasi - bersih 675.191.560 668.369.776 Tingkat/Level 1 833.281.900 829.450.311 Bonds payable - net
Pinjaman yang dapat
dikonversikan 21.906.240 30.350.000 Tingkat/Level 2 20.092.531 27.850.000 Convertible loan
Nilai wajar utang obligasi didasarkan pada harga Fair value of bonds payable is based on available
kuotasi yang tersedia di bursa. quoted price from exchange.
Pengukuran nilai wajar diakui dalam laporan posisi Fair value measurements recognized in the
keuangan konsolidasian consolidated statement of financial position
Instrumen keuangan yang diukur berdasarkan nilai Financial instrument measured at fair value
wajar secara substansial diakui sehubungan dengan subsequent to initial recognition pertains to
invstasi pada unit portofolio, dimana diklasifikasi investment in portfolio, which is classified as at fair
sebagai aset pada nilai wajar diakui melalui laba rugi value through profit or loss (Note 6).
(Catatan 6).
Investasi saham pada pihak ketiga yang bukan Investment in shares of stock to unlisted third parties
merupakan perusahaan tercatat yang diklasifikasi which are classified as investment at fair value
sebagai investasi pada nilai wajar melalui penghasilan through other comprehensive income (Notes 6 and
komprehensif lainnya (Catatan 6 dan 20), termasuk 20) falls into Level 2 of the fair value hierarchy.
pada level 2 sesuai dengan tingkatan nilai wajar.
Aset biologis (Catatan 12), termasuk pada level 3 Biological assets (Note 12) falls into Level 3 of the fair
sesuai dengan tingkatan nilai wajar. value hierarchy.
Instrumen keuangan derivatif diukur pada nilai wajar Derivative financial instruments were measured at
dan termasuk pada Level 2 sesuai dengan tingkatan fair value and fall into Level 2 of the fair value
nilai wajar. Metode penilaian yang digunakan adalah hierarchy. Valuation technique used is discounted
arus kas diskonto, dimana arus kas masa depan cash flow, wherein future cash flows are estimated
diestimasi berdasarkan tingkat bunga forward (dari based on forward interest rates (from observable
kurva yang dapat diamati pada akhir periode yield curves at the end of the reporting period) and
pelaporan) dan tingkat bunga berdasarkan kontrak, contract interest rates, discounted at a rate that
lalu didiskontokan dengan menggunakan tingkat reflects the credit risk of various counterparties.
bunga yang mencerminkan risiko kredit dari beberapa
pihak.
Tingkatan nilai wajar adalah sebagai berikut: The fair value hierarchy are as follow:
• Tingkat 1 pengukuran nilai wajar adalah yang • Level 1 fair value measurements are those
berasal dari harga kuotasian (tak disesuaikan) derived from quoted prices (unadjusted) in active
dalam pasar aktif untuk aset atau liabilitas yang markets for identical assets or liabilities;
serupa;
- 168 -
Page 173
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
• Tingkat 2 pengukuran nilai wajar adalah yang • Level 2 fair value measurements are those
berasal dari input selain harga kuotasian yang derived from inputs other than quoted prices
termasuk dalam Tingkat 1 yang dapat diobservasi included within Level 1 that are observable for
untuk aset atau liabilitas, baik secara langsung the asset or liability,either directly (i.e. as prices)
(misalnya harga) atau secara tidak langsung or indirectly (i.e. derived from prices); and
(misalnya deviasi dari harga); dan
• Tingkat 3 pengukuran nilai wajar adalah yang • Level 3 fair value measurements are those
berasal dari teknik penilaian yang mencakup derived from valuation techniques that include
input untuk aset atau liabilitas yang bukan inputs for the asset or liability that are not based
berdasarkan data pasar yang dapat diobservasi on observable market data (unobservable
(input yang tidak dapat diobservasi). inputs).
Tidak terdapat transfer antara Level 1 dan 2 selama There was no transfer between Levels 1 and 2 during
periode berjalan. the period.
52. SIFAT DAN TRANSAKSI PIHAK BERELASI 52. NATURE OF RELATIONSHIPS AND
TRANSACTIONS WITH RELATED PARTIES
Sifat Hubungan Pihak Berelasi Nature of Relationships
a. Pemegang saham utama Perusahaan adalah a. PT Indika Inti Investindo and PT Teladan
PT Indika Inti Investindo dan PT Teladan Resources are the majority stockholders of the
Resources. Company.
b. Pihak berelasi yang memiliki perusahaan induk b. Related parties which have the same majority
yang sama dengan Perusahaan adalah: stockholder as the Company:
• PT Power Jawa Barat • PT Power Jawa Barat
• PT Marmitria Land • PT Marmitria Land
c. Pihak berelasi yang merupakan perusahaan c. Related parties which are associates and joint
asosiasi dan ventura bersama dari entitas anak: venture of the Company’s subsidiaries:
• PT Sea Bridge Shipping • PT Sea Bridge Shipping
• PT Cirebon Electric Power • PT Cirebon Electric Power
• PT Cirebon Power Services • PT Cirebon Power Services
• PT Cirebon Energi Prasarana • PT Cirebon Energi Prasarana
• PT Sumber Multi Energi Penajam • PT Sumber Multi Energi Penajam
• PT Narada Sahara Kencana • PT Narada Sahara Kencana
• PT Pelabuhan Patimban Internasional • PT Pelabuhan Patimban Internasional
• PT Mitra Samudra Indonesia • PT Mitra Samudra Indonesia
• PT Intan Resources Indonesia • PT Intan Resources Indonesia
• PT Natura Aromatik Nusantara (entitas • PT Natura Aromatik Nusantara (an associate
asosiasi sampai dengan bulan Maret 2024) until March 2024) (Note 1)
(Catatan 1)
d. CSTS Joint Operation merupakan proyek d. CSTS Joint Operation is joint operations between
kerjasama antara TPEC, TPE dan pihak ketiga TPEC, TPE and third party (Note 19).
(Catatan 19).
e. Manajemen kunci yang meliputi anggota Dewan e. Key management personnel includes
Komisaris dan Direksi Perusahaan. Commissioners and Directors of the Company.
f. PT Imeco Multi Prasarana (IMECO) adalah pihak f. PT Imeco Multi Prasarana (IMECO) is a related
berelasi karena salah seorang pemegang saham party because one of the main shareholders of
utama Perusahaan merupakan manajemen the Company is also the key management in
kunci di IMECO. IMECO.
g. Yayasan Indika Untuk Indonesia (Indika g. Yayasan Indika Untuk Indonesia (Indika
Foundation) adalah pihak berelasi karena Foundation) is a related party because the
beberapa personel manajemen kunci Company has some key management personnel
Perusahaan sama dengan Indika Foundation. in common with Indika Foundation.
- 169 -
Page 174
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
Kebijakan Grup mengenai persyaratan dan kondisi The Group policy as regards to terms and conditions
transaksi dengan pihak berelasi setara dengan yang of transactions with related parties are made as at
berlaku dalam transaksi wajar. conditions as those done with third parties.
Transaksi Pihak Berelasi Transactions with Related Parties
Dalam kegiatan usaha normalnya, Grup melakukan In the normal course of business, the Group entered
transaksi tertentu dengan pihak berelasi meliputi, into certain transactions with related parties including,
antara lain, sebagai berikut: among others, the following:
a. Jumlah kompensasi komisaris dan direksi a. Total remuneration of commissioners and
Perusahaan adalah sebesar: directors of the Company are as follows:
2024 2023
US$ US$
Komisaris Commissioners
Manfaat jangka pendek 1.054.097 1.613.816 Short-term benefits
Direksi Directors
Manfaat jangka pendek 3.785.500 5.824.553 Short-term benefits
Jumlah 4.839.597 7.438.369 Total
b. ILSS memberikan jasa kepada CSTS Joint b. ILSS provides service to CSTS Joint Operation as
Operation sebagai subkontraktor untuk Proyek subcontractor for Marshalling and Stevedoring
Marshalling and Stevedoring di Gresik, Project in Gresik, Surabaya.
Surabaya.
TPEC dan TPE memberikan personil untuk TPEC and TPE provides personnel for the job
pekerjaan EPC Tangguh Expansion Project Tangguh Expansion Project EPC to CSTS JO as
kepada CSTS JO yang disebut sebagai their own portion.
own-portion.
KJA melakukan penjualan batubara kepada KJA generates coal sales to PT Cirebon Electric
PT Cirebon Electric Power dan PT Cirebon Energi Power and PT Cirebon Energi Prasarana.
Prasarana.
Piutang Usaha (Catatan 7) Trade Accounts Receivable (Note 7)
Persentase terhadap
jumlah aset/
Jumlah/ Amount Percentage to total assets
30 September/ 31 Desember/ 30 September/ 31 Desember/
September 30, December 31, September 30, December 31,
2024 2023 2024 2023
US$ US$
CSTS Joint Operation 46.985.952 55.244.673 1,46% 1,77% CSTS Joint Operation
PT Cirebon Energi Prasarana 18.593.895 13.255.991 0,58% 0,43% PT Cirebon Energi Prasarana
PT Cirebon Electric Power 16.085.132 11.915.768 0,50% 0,38% PT Cirebon Electric Power
PT Sea Bridge Shipping 5.080 - 0,00% - PT Sea Bridge Shipping
PT Empat Mitra Indika Tenaga Surya 23.795 196.323 0,00% 0,01% PT Empat Mitra Indika Tenaga Surya
Jumlah 81.693.854 80.612.755 2,53% 2,59% Total
Pendapatan (Catatan 40) Revenues (Note 40)
Persentase
terhadap pendapatan/
Jumlah/Amount Percentage to total revenues
2024 2023 2024 2023
US$ US$
PT Cirebon Energi Prasarana 65.283.406 57.657.097 3,66% 2,51% PT Cirebon Energi Prasarana
PT Cirebon Electric Power 56.982.990 51.665.184 3,19% 2,25% PT Cirebon Electric Power
CSTS Joint Operation 5.774.169 9.936.227 0,32% 0,43% CSTS Joint Operation
PT Sea Bridge Shipping 199.145 19.905 0,01% 0,00% PT Sea Bridge Shipping
PT Empat Mitra Indika Tenaga Surya 44.605 - 0,00% - PT Empat Mitra Indika Tenaga Surya
Jumlah 128.284.315 119.278.413 7,19% 5,19% Total
- 170 -
Page 175
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
c. Rincian transaksi pembelian dan utang usaha dan c. Details of the trade accounts payable and balances
saldo dengan pihak berelasi adalah sebagai with related parties are as follows:
berikut:
Utang Usaha (Catatan 28) Trade Accounts Payable (Note 28)
Persentase terhadap
jumlah liabilitas/
Jumlah/Amount Percentage to total liabilities
30 September/ 31 Desember/ 30 September/ 31 Desember/
September 30, December 31, September 30, December 31,
2024 2023 2024 2023
US$ US$
PT Sea Bridge Shipping 5.137.441 4.077.079 0,28% 0,23% PT Sea Bridge Shipping
PT Marmitria Land (ML) 608 - 0,00% - PT Marmitria Land (ML)
Jumlah 5.138.049 4.077.079 0,28% 0,23%
Pembelian Jasa Provision of Services
Selama periode sembilan bulan berakhir 30 For the nine-month period ended September 30,
September 2024, CTA membeli jasa pemuatan 2024, CTA purchased coal loading and
dan transportasi batubara dari PT Sea Bridge transshipment services from PT Sea Bridge
Shipping sejumlah US$ 25.801.046 (30 Shipping at the amount of US$ 25,801,046
September 2023: US$ 22.977.806) (Catatan 54). (September 30, 2023: US$ 22,977,806) (Note
54).
d. Grup melakukan transaksi lain dengan pihak d. The Group entered into other transactions with
berelasi. Rincian transaksi dan saldo sebagai related parties. Details of transactions and
berikut: balances are as follows:
Piutang Lain-lain (Catatan 9) Other Accounts Receivable (Note 9)
Grup memberikan pinjaman dana kepada pihak The Group provided loans to related parties and
berelasi dan melakukan pembayaran terlebih also made advance payments of expenses for
dahulu atas biaya pihak berelasi sebagai berikut: related parties, as follows:
731.60
Persentase dari jumlah aset/
Jumlah/Amount Percentage to total assets
30 September/ 31 Desember/ 30 September/ 31 Desember/
September 30, December 31, September 30, December 31,
2024 2023 2024 2023
US$ US$
PT Cirebon Energi Prasarana 16.483.779 15.752.174 0,51% 0,51% PT Cirebon Energi Prasarana
PT Cirebon Electric Power 1.290.178 4.506.882 0,04% 0,14% PT Cirebon Electric Power
PT Power Jawa Barat 2.800.164 2.749.668 0,09% 0,09% PT Power Jawa Barat
PT Empat Mitra Indika Tenaga Surya 90.325 88.696 0,00% 0,00% PT Empat Mitra Indika Tenaga Surya
Lain-lain - 28.205 0,00% 0,00% Others
Jumlah 20.664.446 23.125.625 0,64% 0,74% Total
Dikurangi cadangan kerugian
kredit (2.800.164) (2.749.668) (0,09%) (0,09%) Less allowance for credit losses
Bersih 17.864.282 20.375.957 0,55% 0,65% Net
Dikurangi bagian yang
jatuh tempo dalam
satu tahun - - (0,00%) (0,00%) Less current maturities
Bagian jangka panjang piutang Non-current maturities of other accounts
lain-lain pihak berelasi - bersih 17.864.282 20.375.957 0,55% 0,65% receivable from related parties - net
Mutasi cadangan kerugian kredit adalah sebagai The movements in allowance for credit losses
berikut: are as follows:
30 September/ 31 Desember/
September 30, December 31,
2024 2023
US$ US$
Saldo awal periode 2.749.668 2.694.429 Balance at beginning of period
Selisih kurs 50.496 55.239 Translation adjustment
Saldo akhir periode 2.800.164 2.749.668 Balance at end of period
Manajemen berpendapat bahwa cadangan Management believes that the allowance for
kerugian penurunan kredit piutang lain-lain credit losses on other accounts receivable from
kepada pihak berelasi adalah cukup. related parties is adequate.
- 171 -
Page 176
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
PT Cirebon Energi Prasarana (CEPR) PT Cirebon Energi Prasarana (CEPR)
Pada tahun 2017, CEPR menandatangani In 2017, CEPR entered into Shareholder Bridge
sejumlah Perjanjian Pemegang Saham Bridge Loan (SBL) Agreements with its shareholders
Loan (SBL) dengan pemegang saham yang wherein the shareholders agreed to provide
setuju untuk menyediakan pinjaman kepada bridge loans to CEPR, proportionate with their
CEPR, proporsional dengan persentase percentage of ownership in CEPR. PEC, as a 25%
kepemilikan di CEPR. PEC, sebagai 25% shareholder in CEPR, granted bridge loans in the
pemegang saham di CEPR, menyetujui pinjaman total amount of US$ 7,275,000 bearing interest
sebesar US$ 7.275.000 dengan tingkat bunga at 4% per annum. The loan is used to finance
4% per tahun. Pinjaman ini digunakan untuk CEPR’s project cost and expenses.
membiayai biaya dan beban proyek CEPR.
Perusahaan, sebagai sponsor dan pemilik tidak The Company, as a sponsor and owns indirectly
langsung atas 6,25% saham di CEPR, 6.25% ownership in CEPR, granted several
menyetujui pinjaman sebesar US$ 3.431.256 bridge loans in the total amount of
dengan tingkat bunga 4% per tahun. Pinjaman US$ 3,431,256, bearing interest at 4% per
ini digunakan untuk membiayai biaya dan beban annum. The loan is used to finance CEPR’s
proyek CEPR. project cost and expenses.
Setelah menyelesaikan Financial Close Upon achieving its Financial Close on
(“Financial Closing”) pada tanggal 9 Nopember November 9, 2017 (“Financial Closing”) with its
2017 dengan senior lendersnya, konsorsium senior lenders, a consortium between Japan
antara Japan Bank for International Cooperation Bank for International Cooperation (JBIC),
(JBIC), Nippon Export and Investment Insurance Nippon Export and Investment Insurance (NEXI)
(NEXI) and Korea Exim Bank (KEXIM), CEPR and Korea Exim Bank (KEXIM), CEPR fully paid
telah melunasi seluruh pokok pinjaman dari all principal outstanding loan from the Company
Perusahaan dan PEC. Bunga yang terhutang and PEC. The interest accruing on the loans
pada pinjaman tetap outstanding dikonversi remained outstanding and were converted to a
menjadi perjanjian pinjaman baru, dengan new loan agreement, bearing interest at 4% per
tingkat bunga sebesar 4% per tahun. annum.
Pada bulan Februari 2022, Perusahaan In February 2022, the Company provided loan
memberikan pinjaman sebesar US$ 13.593.750 at the amount of US$ 13,593,750 to CEPR,
kepada CEPR, dengan bunga 7% per tahun. bearing an interest at 7% per annum. The loan
Pinjaman ini jatuh tempo pada ulang tahun will mature at the earlier of 25th anniversary
ke-25 terhitung sejak tanggal perjanjian atau from the date of the loan agreement or
tanggal 9 Februari 2047, mana yang lebih cepat. February 9, 2047. Prepayment of loan is
Pembayaran lebih awal diperbolehkan, allowed, as further agreed in the agreement.
sebagaimana diatur lebih lanjut dalam The loan provided by the Company above was
perjanjian. Pinjaman yang diberikan oleh made proportionate to its effective ownership in
Perusahaan dilakukan proporsional dengan CEPR.
jumlah kepemilikan efektifnya di CEPR.
PT Cirebon Electric Power (CEP) PT Cirebon Electric Power (CEP)
Perusahaan menyetorkan sejumlah dana kepada The Company paid certain amount of fund to
Mizuho Bank Ltd. untuk menjamin Debt Service Mizuho Bank Ltd. to secure the Debt Service
Reserve Requirement (DSRR) atas fasilitas Reserve Requirement (DSRR) for CEP’s project
pembiayaan proyek CEP. Transaksi ini dicatat financing facility. Such transaction was recorded
sebagai piutang lain-lain kepada CEP. Karena as part of other accounts receivable from CEP.
fluktuasi tingkat suku bunga acuan pinjaman Due to fluctuation in interest rate reference for
CEP, jumlah DSRR yang harus disetor oleh CEP’s loan, the DSRR amount required from the
Perusahaan telah direvisi beberapa kali. Company has been revised several times.
Pada bulan Juli 2024, Perusahaan mendapatkan In July 2024, the Company obtained a
fasilitas committed SBLC dari KEB (Catatan 54) committed SBLC from KEB (Note 54) to secure
untuk menjamin kebutuhan DSRR terkait proyek the above DSRR requirement for CEP project
CEP dan telah digunakan untuk menggantikan and has been used to partially replace cash
sebagian jaminan kas yang diberikan oleh guarantee provided by the Company.
Perusahaan.
Saldo akhir piutang dari CEP adalah sebesar US$ Latest outstanding balance of the receivable
1.288.616 pada tanggal 30 September 2024 (31 from CEP was US$ 1,288,616 as of September
Desember 2023: US$4.505.449). 30, 2024 (December 31, 2023: US$4,505,449).
- 172 -
Page 177
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
PT Power Jawa Barat (PJB) PT Power Jawa Barat (PJB)
PJB merupakan proyek pembangkit listrik PJB is a project for coal-fired power plant located
tenaga batubara yang berlokasi di Bojonegoro, in Bojonegoro, Banten (formerly West Java)
Banten (dahulu propinsi Jawa Barat) yang owned by related party of one of the
dimiliki oleh pihak berelasi dari salah seorang Commissioners of the Company, working
Komisaris Perusahaan dengan bekerjasama together with third parties to build such power
dengan pihak ketiga sebelum krisis ekonomi plant prior to the economic crisis in 1998.
tahun 1998 untuk membangun pembangkit
listrik tersebut.
Piutang lain-lain dari PJB terutama merupakan Other accounts receivable from PJB mainly
piutang yang berasal dari biaya-biaya PJB yang represents receivable arising from expenses of
dibayarkan terlebih dahulu oleh Perusahaan. PJB paid in advance by the Company.
Sejak tahun 2009, manajemen memutuskan Since 2009, management decided to provide full
untuk mencadangkan seluruh piutangnya dari provision on its accounts receivable from PJB
PJB setelah mempertimbangkan kondisi proyek after considering the condition of the project
yang tidak memiliki perkembangan kemajuan which has no significant progress.
yang berarti.
Penghasilan Bunga dari Piutang Pihak Berelasi Interest Income on Loans to Related Parties
(Catatan 43) (Note 43)
Persentase terhadap
pendapatan investasi/
Percentage to total
Jumlah/Amount investment income
2024 2023 2024 2023
US$ US$
PT Cirebon Energi Prasarana 731.605 721.602 4,46% 4,86% PT Cirebon Energi Prasarana
PT Sumber Energi Penajam - 7.469 - 0,05% PT Sumber Energi Penajam
Jumlah 731.605 729.071 4,46% 4,91% Total
Bunga atas pinjaman jangka pendek dari pihak Interest on short-term loan from related parties
berelasi
Pada tahun 2020, TPEC bersama dengan PT Saipem In 2020, TPEC entered into MOU with PT Saipem
Indonesia (Saipem) dan PT Chiyoda International Indonesia (Saipem) and PT Chiyoda International
Indonesia (Chiyoda) menandatangani Nota Indonesia (Chiyoda) related to payments on behalf of
Kesepahaman terkait dengan pembayaran atas nama Tripatra with respect to its contribution to the cash
Tripatra dalam rangka kontribusi suntikan dana injection to CSTS JO.
kepada CSTS JO.
Pinjaman dari Saipem dan Chiyoda terdenominasi Loans from Saipem and Chiyoda were denominated in
dalam mata uang US$, dikenakan bunga per tahun US$, bearing interest at 4% above LIBOR 6 months
sebesar 4% diatas LIBOR 6 bulan. Pinjaman sudah per annum. Loans were fully settled on March 16,
dilunasi pada tanggal 16 Maret 2023. 2023.
Persentase terhadap
jumlah beban keuangan/
Percentage to total
Jumlah/Amount finance cost
2024 2023 2024 2023
US$ US$
PT Saipem Indonesia - 30.246 - 0,05% PT Saipem Indonesia
PT Chiyoda International Indonesia - 25.470 - 0,04% PT Chiyoda International Indonesia
Jumlah - 55.716 - 0,09% Total
Sewa Gedung Kantor Office Space Rental
Beberapa entitas anak lain menyewa ruangan kantor Some other subsidiaries rent office building from ML,
dari ML yang dicatat sebagai Aset hak-guna which was recorded as part of right-of-use assets
berdasarkan PSAK 73. Jumlah biaya sewa kepada ML based on PSAK 73. Total rent expense to ML in 2024
Pada tahun 2024 sebesar US$ 1.176.259 amounted to US$ 1,176,259 (2023: US$ 1,357,349).
(2023: US$ 1.357.349).
- 173 -
Page 178
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
Pinjaman jangka panjang (Catatan 31) Long-term loans (Note 31)
Pada tanggal 29 Juli 2022, TIME menandatangani On July 29, 2022, TIME signed a loan agreement with
perjanjian pinjaman dengan EMITS, dimana EMITS EMITS, wherein EMITS agrees to provide loan facility
setuju untuk menyediakan fasilitas pinjaman sebesar amounting to Rp 36,284,480,500 to TIME for a
Rp 36.284.480.500 kepada TIME, dengan jangka maximum period of 15 years after Commercial
waktu maksimal selama 15 tahun setelah Commercial Operation Date (COD). The loan bears interest at
Operation Date (COD). Pinjaman dikenakan bunga 6.5% per annum. As of September 30, 2024,
sebesar 6,5% per tahun. Pada tanggal 30 September outstanding loan principal and accrued interest
2024, jumlah pokok pinjaman dan bunga terutang amounted to Rp 17,380,000,000 (equivalent to US$
masing-masing sebesar Rp 17.380.000.000 (setara 1,148,104) and Rp 2,220,410,186 (equivalent to US$
dengan US$ 1.148.104) dan Rp 2.220.410.186 146,678), respectively (December 31, 2023:
(setara dengan US$ 146.678) (31 Desember 2023: outstanding loan principal and accrued interest
jumlah pokok pinjaman dan bunga terutang masing- amounted to Rp 18,010,339,173 (equivalent to US$
masing sebesar Rp 18.010.339.173 (setara dengan 1,168,289) and Rp 1,310,529,739 (equivalent to US$
US$ 1.168.289) dan Rp 1.310.529.739 (setara US$ 85,011), respectively).
dengan US$ 85.011)).
Beban bunga yang dicatat oleh TIME atas pinjaman Interest expense recorded by TIME on the above loan
tersebut diatas pada tahun 2024 sebesar US$ 57.382 in 2024 amounted to US$ 57,382 (2023: US$ nil,
(2023: US$ nihil, dimana beban bunga tereliminasi wherein interest expense was fully eliminated when
penuh saat EMITS masih terkonsolidasi). EMITS was consolidated).
Perjanjian Pemasokan Supply Agreement
Pada tanggal 19 Mei 2022, TIME menandatangani On May 19, 2022, TIME entered into supply
perjanjian pemasokan dengan EMITS yang mulai agreement with EMITS with effective date from
berlaku sejak 7 Januari 2022, dimana EMITS wajib January 7, 2022, wherein EMITS agreed to supply and
memasok dan mengirimkan peralatan tertentu deliver certain equipment to TIME in accordance with
kepada TIME sesuai dengan spesifikasi, syarat dan specification, terms and schedule as further specified
jadwal yang ditetapkan berdasarkan perjanjian. in the agreement. Agreed price for such equipment
Harga peralatan yang disepakati adalah was Rp 16,258,271,066, inclusive of all taxes, fees
Rp 16.258.271.066 termasuk pajak, biaya dan and costs.
ongkos.
Sesuai dengan perjanjian, periode jaminan akan In accordance with the agreement, warranty period of
dimulai dari pengiriman peralatan kepada TIME the equipment shall commence from the delivery of
dan/atau kontraktornya dan sampai 25 tahun setelah the equipment to TIME and/ or its contractors and
tanggal operasi komersial. until 25 years after the commercial operation.
Perjanjian Sewa Operasional Operating Lease Agreement
Pada tanggal 24 Maret 2022, EMITS telah On 24 March 2022, EMITS has signed an Operating
menandatangani suatu Perjanjian Sewa Operasional Lease Agreement with PSB. Based on this agreement,
dengan PSB. Berdasarkan perjanjian ini, PSB akan PSB will lease equipment for the solar panel
menyewa peralatan pembangkit listrik fotovoltaik dari photovoltaic from EMITS. The implementation of this
EMITS. Pelaksanaan Perjanjian ini merupakan Agreement is business activity of EMITS as lessor, and
kegiatan usaha utama dari EMITS selaku pemberi therefore this transaction is exempted from obligation
sewa, sehingga transaksi ini dikecualikan dari to obtain fairness opinion.
kewajiban untuk menggunakan pendapat kewajaran.
53. INFORMASI SEGMEN 53. SEGMENT INFORMATION
PSAK 108 mensyaratkan agar segmen operasi PSAK 108 requires operating segments to be
ditentukan berdasarkan laporan internal tentang identified on the basis of internal reports on
komponen Grup yang direview secara berkala oleh components of the Group that are regularly reviewed
pengambil keputusan utama dalam rangka by the chief operating decision maker in order to
mengalokasikan sumber daya terhadap segmen allocate resources to the segments and to assess their
tersebut dan menilai kinerja segmen tersebut. performance.
- 174 -
Page 179
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
Untuk tujuan pelaporan manajemen, Grup For management reporting purposes, the Group are
dikelompokkan berdasarkan (1) energi (mencakup principally organized based on (1) energy (covering
jasa energi, sumber daya energi dan infrastruktur energy services, energy resources and energy
energi) dan (2) kepemilikan portofolio lainnya infrastructure) and (2) other portfolio (covering
(mencakup logistik dan infrastruktur, mineral, bisnis logistic infrastructure, minerals, green business,
hijau, ventura digital dan lain-lain). digital ventures and others).
Sejak triwulan akhir tahun 2023, manajemen Starting 2023, management has again reviewed each
melakukan reviu kembali atas setiap entitas anak subsidiary based on its expected performance and
berdasarkan kinerja dan kontribusi yang diharapkan contribution to the above segment reporting and
terhadap segmen diatas dan telah menetapkan determined the following reportable segments with
pelaporan segmen sebagaimana di bawah ini, dengan some minor adjustments for the March 2023
penyesuaian minor terhadap informasi komparatif comparative information:
Maret 2023:
Energi Energy
• Jasa energi • Energy services
Bisnis utama Grup pada segmen ini adalah Group’s core businesses in this sector are Tripatra.
Tripatra. Melalui Tripatra, Grup memberikan jasa Through Tripatra, Group provides engineering,
teknik, pengadaan material dan pelaksanaan procurement and construction services,
konstruksi, operasi dan pemeliharaan serta operations and maintenance and logistic services.
logistik.
• Sumber daya energi • Energy resources
KJA adalah aset utama Grup dalam segmen ini dan KJA is Group’s core asset in this sector and is the
merupakan produsen batubara ketiga terbesar di third largest producer of coal in Indonesia based
Indonesia menurut volume produksi. Pada on production volume. In this segment, Group is
segmen ini, Grup juga didukung perdagangan also supported by coal trading, represented by ICI
batubara, yang diwakili oleh ICI dan IETPL. and IETPL.
• Infrastruktur energi • • Energy infrastructure
Proyek pembangkit listrik (PPL) berkapasitas 660 The 660 megawatt power generation plant (PGP)
megawatt yang terletak di Cirebon, Jawa Barat in Cirebon, West Java (CEP) and the 1,000
(CEP) dan PPL berkapasitas 1.000 megawatt di megawatt in Cirebon (CEPR) represent Group’s
Cirebon (CEPR) merupakan investasi Grup dalam investments in this sector. Interport Group,
segmen ini. Grup Interport, termasuk KGTE, turut including KGTE also contributed to this segment,
memberikan kontribusi pada segmen ini, namun however starting 2021, Interport Group is
pada tahun 2021, Grup Interport telah diklasifikasi classified as logistic and infrastructure).
sebagai segmen logistik dan infrastruktur.
Kepemilikan portofolio lainnya Other portfolio holdings
Pada segmen ini, Grup memiliki logistik dan In this pillar, Group has logistic infrastructure,
infrastruktur, mineral, bisnis hijau, ventura digital dan minerals, green business, digital ventures, and
lainnya. others.
• Logistik dan infrastruktur • • Logistic and infrastructure
Sejak tahun 2021, Grup Interport berkontribusi Starting 2021, Interport Group contributes to this
pada segmen ini, yang terutama didukung oleh sector, which is mainly backed up by the
operasional di ILSS dan KGTE. ILSS memberikan operations of ILSS and KGTE. ILSS engages in
jasa logistik untuk membantu operasi pembangkit logistic and port management and provides
listrik. Jasa yang diberikan meliputi operasi logistics to support power plant operations. Its
perpindahan kapal (transshipment), operasi kapal services include ship to ship operations
tunda dan tongkang, operasi jetty dan (transshipment), tug and barge operations, jetty
pemeliharaan, manajemen persedian batubara, operation and maintenance, coal stockpile
peralatan penunjang, operasi dan pemeliharaan management, balance of plant, plant and heavy-
pabrik dan alat berat, penanganan limbah. duty equipment operation and maintenance, and
waste handling.
- 175 -
Page 180
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
ILSS juga memegang izin perusahaan bisnis ILSS also holds port business entities license from
pelabuhan yang dimana memperbolehkan ILSS the government, which enable ILSS to operate
untuk mengoperasikan pelabuhan di seluruh any port in Indonesia.
Indonesia.
KGTE bergerak dalam bidang terminal KGTE engages in terminal fuel storage. On
penyimpanan bahan bakar. Pada 12 April 2018, April 12, 2018, KGTE signed a storage facility
Kariangau menandatangani perjanjian layanan service agreement with PT ExxonMobil Lubricants
fasilitas penampungan dengan PT ExxonMobil Indonesia, which fuel storage has been
Lubricants Indonesia, dimana penyimpanan bahan commercially operated in November 2020.
bakar ini sudah beroperasi secara komersial pada
bulan November 2020.
Mulai Februari 2023, SBS, entitas anak yang Starting February 2023, SBS, our associate entity
bergerak dalam bidang pengangkutan barang engaged in the domestic good shipment serving for
domestik untuk melayani KJA dan CTA, termasuk KJA and CTA, is included in this segment reporting
dalam segmen ini untuk evaluasi manajemen. for management analysis.
• Mineral • • Mineral
Pada segmen ini, Grup didukung oleh IMI. IMI In this sector, the Company is backed up by IMI.
melakukan investasi strategis di perusahaan IMI made a strategic investment in gold mining
pertambangan emas Nusantara Resources Limited company Nusantara Resources Limited and
dan PT Masmindo Dwi Area. PT Masmindo Dwi Area.
Selain Nusantara dan PT Masmindo Dwi Area, In addition to Nusantara and PT Masmindo Dwi
sektor mineral juga didukung oleh dua entitas Area, mineral sector is also backed-up by two
anak, yaitu (1) PT Rockgeo Energi Nusantara yang subsidiaries, namely (1) PT Rockgeo Energi
aktif dalam industri perdagangan nikel dan (2) Nusantara, which is active in nickel trading and (2)
entitas anak yang baru diakusisi pada tahun 2022, newly acquired subsidiaries in year 2022,
PT Perkasa Investama Mineral (PIM). PIM memiliki PT Perkasa Investama Mineral (PIM). PIM has two
dua entitas anak, yaitu PT Mekko Metal Mining subsidiaries, which are PT Mekko Metal Mining
(bergerak di bidang pertambangan bijih bauksit) (engaged in bauxite mining) and PT Perkasa
dan PT Perkasa Alumina Indonesia (bergerak di Alumina Indonesia (engaged in non-ferrous base
industri pembuatan logam dasar bukan besi). metal manufacturing industry).
• Bisnis hijau • • Green business
EMITS dan TIME, yang menyediakan solusi one- EMITS and TIME, which provides a one-stop-shop
stop-shop solusi energi terbarukan untuk sektor renewable energy solutions platform for
komersial dan industri Indonesia, merupakan Indonesia’s commercial and industrial sectors, is
salah satu yang masuk dalam segmen ini. one of the contributor for this segment.
Grup IMG mengembangkan bisnis kendaraan IMG Group is developing 2-wheels electric vehicle
elektrik roda 2 dan grup MMG yang business and MMG Group which develops 4-
mengembangkan bisnis kendaraan elektrik roda 4 wheels electric vehicle business in Indonesia,
di Indonesia melihat masih besarnya peluang prospecting the large domestic market
pasar domestik untuk sektor ini. Selain itu, hal ini opportunities for this sector. In addition, this is
juga sejalan dengan roadmap Net Zero Emission also aligned with the Net Zero Emission roadmap
sebagaimana dicanangkan oleh pemerintah yang established by government that aims to boost
berencana untuk meningkatkan kendaraan roda 2 2-wheels and 4-wheels.
dan kendaraan roda 4.
Pada tahun 2023, beberapa entitas anak, seperti In 2023, some subsidiaries, namely Kalista, KSH,
Kalista, KSH, KND, KRO, KBN, IBN dan MTB KND, KRO, KBN, IBN and MTB were established to
didirikan untuk mendukung segmen ini. Kalista support this segment. Kalista group support EV
group memberikan layanan leasing EV untuk leasing for companies, while IBN and MTB were
perusahaan-perusahaan, sedangkan IBN dan MTB established to conduct battery business for motor
bergerak dalam industri baterai untuk kendaraan vehicles, conduct management consulting
bermotor, memberikan jasa konsultasi services, wholesale trade in motorcycles and cars,
manajemen, perdagangan dalam jumlah besar related parts and accessories.
untuk kendaraan bermotor dan mobil, serta suku
cadang dan aksesoris terkait.
- 176 -
Page 181
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
IMP telah mengembangkan lebih dari 160.000 ha IMP has developed more than 160,000 ha
area hutan industri yang berlokasi di Kalimantan industrial forest area, located in East and Central
Timur dan Tengah. IMP mengembangkan palet Kalimantan. IMP develops wood pellets for
kayu untuk biomassa (untuk co-firing) di area biomass (for co-firing) with effective area for
efektif untuk penanaman seluas lebih dari plantation area of more than 13,000 ha.
13.000 ha.
Pengembangan tersebut dilakukan sebagai bagian The development is part of Indika Energy’s actions
dari upaya untuk mendukung ambisi Indika to achieve Net Zero Emission by 2050 and to also
Energy dalam mencapai Net Zero Emission pada contributed to create a more sustainable
tahun 2050 untuk berkontribusi dalam Indonesia.
menciptakan Indonesia yang lebih berkelanjutan.
• Ventura digital • • Digital ventures
Kontributor utama pada segmen ini adalah Main contributor in this sector is Xapiens.
Xapiens.
Xapiens memberikan pelayanan ICT untuk Xapiens delivers Enterprise ICT services to
memperbaiki produktivitas perusahaan dengan companies resulting in better productivity by
salah satu caranya, mengembangkan dan among others, developing and managing
mengelola aplikasi perusahaan, integrasi sistem enterprise applications, system integration and
dan solusi, dan juga menyediakan pelayanan solutions, as well as providing protection through
proteksi teknologi informasi dan teknologi its information technology and operational
operasional cyber security services. technology cyber security services.
• Lain-lain • Others
IMAN, BIG and BID yang didirikan oleh IMAN, BIG dan BID, established by the Company
Perusahaan pada tahun 2023 untuk fokus in 2023 which focus on distribution for healthcare
melakukan distribusi alat kesehatan menjadi equipment, is one of the supports for this
pendukung segmen ini. segment.
IECPL, IECPL III and IECPL IV masuk dalam IECPL, IECPL III and IECPL IV are included in this
segmen ini. segment.
IPY yang memberikan jasa manajemen dan IPY which provides management and building
pelayanan untuk kantor di Bintaro termasuk dalam services for office building in Bintaro is included in
segmen ini. this segment.
ICPL melakukan beberapa aktivitas perdagangan ICPL has some trading for steel scrap, nickel and
untuk scrap baja, nikel, peralatan transportasi transportation equipment, which revenues and
dimana pendapatan dan kinerjanya dimasukkan performances are included in this segment.
dalam segmen ini.
- 177 -
Page 182
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
30 September/September 30 , 2024
Energi/Energy Kepemilikan Portofolio Lainnya/ Other Portfolio Holdings
Sumber Daya Infrastruktur Logistik dan
Jasa Energi/ Energi/ Energi/ infrastruktur/
Energy Energy Energy Logistic and Mineral/ Bisnis hijau/ Ventura digital/ Lainnya/ Eliminasi/ Konsolidasian/
Services Resources Infrastructure infrastructure Mineral Green business Digital ventures Others Elimination Consolidated
US$ US$ US$ US$ US$ US$ US$ US$ US$ US$
Pendapatan Revenues
Penjualan kepada Pihak Eksternal 145.684.934 1.561.856.424 - 28.719.490 4.756.714 22.694.560 11.222.865 9.232.640 - 1.784.167.627 External Sales
Penjualan antar segmen 3.132.921 - - 56.569.230 - 266.155 4.499.797 2.752.430 (67.220.533) - Inter-segement Sales
Jumlah Pendapatan 148.817.855 1.561.856.424 - 85.288.720 4.756.714 22.960.715 15.722.662 11.985.070 (67.220.533) 1.784.167.627 Total Revenues
Hasil segmen 17.169.130 220.253.501 - 21.790.694 1.331.595 1.290.297 4.093.706 2.264.624 1.199.807 269.393.354 Segment result
Bagian laba bersih entitas asosiasi - - 11.642.397 3.484.910 - (675.026) (6.723) - - 14.445.558 Equity in net profit of associates
Amortisasi aset tidak berwujud - - - - (297.848) (525.611) - (157.799) - (981.258) Amortization of intangible assets
Beban penjualan, umum dan Selling, general and administrative
administrasi (9.661.538) (69.468.632) (2.882) (9.651.552) (5.456.694) (22.576.090) (1.466.793) (22.497.102) 7.634.960 (133.146.323) expenses
Pendapatan investasi 6.545.938 11.689.067 97.589 6.348.162 322.968 3.586.360 142.305 65.761.790 (78.093.065) 16.401.114 Investment income
Beban keuangan (1.912.999) (3.004.317) (6.121) (3.921.845) (580.791) (5.148.114) (65.462) (118.397.594) 61.279.375 (71.757.868) Finance cost
Beban pajak final (4.034.216) - - (1.160.457) - (246.609) - (393.335) - (5.834.617) Final tax
Penurunan nilai aset - - - - - - - - - - Impairment of assets
Lain-lain - bersih (329.851) (7.392.701) (40.811) 11.823.127 (79.507) (670.857) 25.497 11.906.302 (8.547.867) 6.693.332 Others - net
Laba (rugi) sebelum pajak 7.776.464 152.076.918 11.690.172 28.713.039 (4.760.277) (24.965.650) 2.722.530 (61.513.114) (16.526.790) 95.213.292 Profit (loss) before tax
Manfaat (beban) pajak (562.192) (36.493.427) - (708.021) 74.831 (4.961.478) (373.348) 140.913 - (42.882.722) Tax benefit (expense)
Laba bersih periode berjalan 52.330.570 Profit for the period
Didistibusikan kepada: Atributeable to:
Pemilik Entitas Induk 34.408.565 Owners of the company
Kepentingan non pengendali 17.922.005 Non-controlling interest
Jumlah Laba Konsolidasian 52.330.570 Total Consolidated Profit
Aset segmen 301.837.327 1.138.987.558 425.349.100 453.004.481 440.420.343 455.539.032 73.333.667 3.647.418.123 (3.707.618.149) 3.228.271.482 Segment Assets
Liabilitas Segmen 35.052.895 53.755.492 - 66.169.121 193.273.193 140.393.031 1.755.209 1.174.513.981 (375.882.617) 1.289.030.305 Segment Liabilities
Liabilitas yang tidak dapat dialokasikan 155.244.400 380.685.197 99.843 29.007.796 62.564.272 65.043.230 7.287.213 431.139.927 (561.979.447) 569.092.431 Unallocated Liabilities
Jumlah Liabilitas yang dikonsolidasikan 190.297.295 434.440.689 99.843 95.176.917 255.837.465 205.436.261 9.042.422 1.605.653.908 (937.862.064) 1.858.122.736 Total Consolidated Liabilities
Informasi lainnya Other information
Penambahan pada aset tetap, aset Addition to property, plant and equipment,
hak-guna dan pengembangan sistem right-of-use assets and system
dan perangkat lunak komputer 71.533.125 development and computer software
Beban penyusutan 25.504.232 Depreciation expense
Amortisasi biaya emisi obligasi Amortization on bond issuance cost
dan diskon obligasi 4.205.587 and discount
30 September/September 30 , 2023
Energi/Energy Kepemilikan Portofolio Lainnya/ Other Portfolio Holdings
Sumber Daya Infrastruktur Logistik dan
Jasa Energi/ Energi/ Energi/ infrastruktur/
Energy Energy Energy Logistic and Mineral/ Bisnis hijau/ Ventura digital/ Lainnya/ Eliminasi/ Konsolidasian/
Services Resources Infrastructure infrastructure Mineral Green business Digital ventures Others Elimination Consolidated
US$ US$ US$ US$ US$ US$ US$ US$ US$ US$
Pendapatan Revenues
Penjualan kepada Pihak Eksternal 181.784.665 2.048.725.295 - 29.188.002 4.475.035 10.644.661 4.251.580 19.659.304 - 2.298.728.542 External Sales
Penjualan antar segmen 8.768.139 11.159.782 - 58.096.242 - 23.568.796 4.193.528 2.676.985 (108.463.472) - Inter-segement Sales
Jumlah Pendapatan 190.552.804 2.059.885.077 - 87.284.244 4.475.035 34.213.457 8.445.108 22.336.289 (128.122.776) 2.298.728.542 Total Revenues
Hasil segmen 20.597.616 396.731.244 - 23.222.960 951.537 4.828.785 1.278.078 1.755.113 (9.590.545) 439.774.788 Segment result
Bagian laba bersih entitas asosiasi - - 14.679.708 4.540.265 - 59.771 (66.761) - - 19.212.983 Equity in net profit of associates
Amortisasi aset tidak berwujud - (35.449.123) - - (165.471) (692.611) - - - (36.307.205) Amortization of intangible assets
Beban penjualan, umum dan Selling, general and administrative
administrasi (12.421.690) (138.711.096) (2.731) (9.539.400) (4.894.116) (18.141.463) (1.303.400) (24.024.717) 15.574.082 (193.464.531) expenses
Pendapatan investasi 8.008.076 5.707.420 214.241 1.062.326 162.581 1.867.533 20.191 48.940.597 (51.129.873) 14.853.092 Investment income
Beban keuangan (2.134.561) (2.933.670) (463) (6.076.548) (1.481.717) (3.214.266) (9.615) (135.429.951) 88.716.616 (62.564.175) Finance cost
Beban pajak final (4.380.522) - - (181.300) - (248.653) (28) (365.666) - (5.176.169) Final tax
Lain-lain - bersih 1.229.867 (11.456.213) (654.358) 3.082.959 (290.880) 284.577 (20.402) 21.263.557 (7.868.244) 5.570.863 Others - net
Laba (rugi) sebelum pajak 10.898.786 213.888.562 14.236.397 16.111.262 (5.718.066) (15.256.327) (101.937) (87.861.067) 35.702.036 181.899.646 Profit (loss) before tax
Manfaat (beban) pajak (2.478.624) (59.880.752) - 164.413 - 138.182 (161.235) - - (62.218.016) Tax benefit (expense)
Laba bersih periode berjalan 119.681.630 Profit for the period
Didistibusikan kepada: Atributeable to:
Pemilik Entitas Induk 93.839.629 Owners of the company
Kepentingan non pengendali 25.842.001 Non-controlling interest
Jumlah Laba Konsolidasian 119.681.630 Total Consolidated Profit
Aset segmen 317.092.983 1.243.568.717 443.127.519 457.426.316 359.780.035 251.221.626 62.272.908 3.305.937.306 (3.314.918.539) 3.125.508.871 Segment Assets
Liabilitas Segmen 43.230.241 43.455.964 - 99.739.041 123.450.894 90.823.088 69.277 1.050.662.565 (296.993.292) 1.154.437.778 Segment Liabilities
Liabilitas yang tidak dapat dialokasikan 168.425.303 378.974.887 56.989 43.140.330 63.631.847 49.315.892 8.074.115 573.417.131 (677.347.878) 607.688.616 Unallocated Liabilities
Jumlah Liabilitas yang dikonsolidasikan 211.655.544 422.430.851 56.989 142.879.371 187.082.741 140.138.980 8.143.392 1.624.079.696 (974.341.170) 1.762.126.394 Total Consolidated Liabilities
Informasi lainnya Other information
Penambahan pada aset tetap, aset Addition to property, plant and equipment,
hak-guna dan pengembangan sistem right-of-use assets and system
dan perangkat lunak komputer 79.214.205 development and computer software
Beban penyusutan 20.012.708 Depreciation expense
Amortisasi biaya emisi obligasi Amortization on bond issuance cost
dan diskon obligasi 2.977.132 and discount
Segmen Geografis Geographic Segment
Grup domestik terutama beroperasi di Indonesia. The Company and its domestic subsidiaries mainly
Entitas anak di luar Indonesia terutama bergerak di operate in Indonesia. Subsidiaries outside of
bidang investasi dan pembiayaan. Jumlah aset dan Indonesia are mainly involved in investment and
pendapatan usaha entitas anak tersebut tidak financing activities. Total assets and revenues from
material terhadap jumlah aset konsolidasian dan these subsidiaries are not material as compared to the
jumlah pendapatan konsolidasian. Dengan demikian, consolidated total assets and consolidated total
Grup tidak menyajikan informasi segmen geografis. revenues, respectively. Therefore, the Group did not
present information on geographical area segments.
Pelanggan dengan transaksi lebih dari 10% dari Customers which represent more than 10% of the
jumlah pendapatan konsolidasian diungkapkan pada total consolidated revenues are disclosed in Note 40.
Catatan 40.
- 178 -
Page 183
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
54. IKATAN DAN KONTIJENSI PERJANJIAN 54. COMMITMENTS AND CONTINGENCIES
SIGNIFIKAN SIGNIFICANT AGREEMENTS
a. Sehubungan dengan Proyek CEPR (“Power II”), a. In relation to the CEPR Project (“Power II”),
PT Cirebon Energi Prasarana (CEPR) telah PT Cirebon Energi Prasarana (CEPR) has signed a
menandatangani Common Agreement tertanggal Common Agreement dated April 18, 2017 (the
18 April 2017 (Common Agreement Awal) yang Original Common Agreement), made among
ditandatangani antara lain oleh (i) CEPR, others, by (i) CEPR, (ii) Japan Bank for
(ii) Japan Bank for International Cooperation, (iii) International Cooperation, (iii) The Export-
The Export- Import Bank of Korea; (iv) bank- Import Bank of Korea; (iv) banks and financial
bank dan institusi-institusi keuangan institutions named under schedule 1 (the
sebagaimana tercantum di dalam lampiran Lenders) of the Original Common Agreement, (v)
1 (Para Pemberi Pinjaman) dari Common Mizuho Bank, Ltd., and (vi) PT Bank Mizuho
Agreement Awal, (v) Mizuho Bank, Ltd., dan Indonesia. The Original Common Agreement has
(vi) PT Bank Mizuho Indonesia. Common been amended and restated on November 3,
Agreement Awal telah diamandemen dan 2017 under an amendment and restatement
dinyatakan kembali pada tanggal 3 November agreement (A&R Agreement) (the Original
2017 berdasarkan perjanjian amandemen dan Common Agreement as amended and restated by
pernyataan kembali terhadap Common the A&R Agreement shall be referred to as, the
Agreement (A&R Agreement) (Common Common Agreement).
Agreement Awal sebagaimana diamandemen dan
dinyatakan kembali dengan A&R Agreement
disebut sebagai, Common Agreement).
Sebagaimana dipersyaratkan di dalam Common As required in the Common Agreement, the
Agreement, Perusahaan telah menandatangani Company has executed an Equity Support
Equity Support Agreement (“ESA”) tertanggal Agreement (“ESA”) dated April 18, 2017 made
18 April 2017 yang dibuat antara (i) PT Imeco between (i) PT Imeco Inter Sarana (IIS), (ii) the
Inter Sarana (IIS), (ii) Perusahaan, (iii) PT Imeco Company, (iii) PT Imeco Multi Infrastruktur,
Multi Infrastruktur, (iv) PT Imeco Multi Prasarana, (iv) PT Imeco Multi Prasarana, (v) PT Indika
(v) PT Indika Energy Infrastructure (IEI), Energy Infrastructure (IEI), (vi) PT Indika Multi
(vi) PT Indika Multi Energi Internasional (IMEI), Energi Internasional (IMEI), (vii) PT Prasarana
(vii) PT Prasarana Energi Indonesia (PEI), Energi Indonesia (PEI), (viii) PEC, and
(viii) PEC, dan (ix) Mizuho Bank, Ltd., yang mana (ix) Mizuho Bank, Ltd., pursuant to which, the
Perusahaan dan IIS memberikan janji-janji Company and IIS provides payment
pembayaran sehubungan dengan kewajiban- undertakings in relation to the payment
kewajiban pembayaran CEPR berdasarkan obligation of CEPR based on the Common
Common Agreement, dengan ketentuan bahwa, Agreement, provided that the aggregate
jumlah keseluruhan kewajiban dari Perusahaan obligation of the Company and IIS shall not
dan IIS tidak melebihi persentase kewajiban yang exceed the percentage of obligation set out under
ditentukan di dalam ESA. the ESA.
Sehubungan dengan ESA dan sebagai salah satu In relation to the ESA and as one of the
kondisi prasyarat Common Agreement, PEC telah conditions precedent in the Common Agreement,
menandatangani akta perjanjian atas gadai PEC has entered into a deed of share pledge
saham No. 62 tertanggal 20 April 2017 yang agreement No. 62 dated April 20, 2017 drawn up
dibuat di hadapan Liestiani Wang, S.H., M.Kn. before Liestiani Wang, S.H., M.Kn. (the Share
(Gadai Saham) dengan PT Bank Mizuho Pledge) with PT Bank Mizuho Indonesia as
Indonesia sebagai penerima gadai (Penerima pledgee (the Pledgee) and CEPR. Pursuant to the
Gadai) dan CEPR. Berdasarkan Gadai Saham, PEC Share Pledge, PEC has pledged is present and
menggadaikan saham-saham miliknya di dalam future shares in CEPR to secure CEPR’s payment
CEPR baik yang saat ini maupun dimasa yang obligation under the Common Agreement.
akan datang untuk menjamin kewajiban
pembayaran CEPR berdasarkan Common
Agreement.
Sebagai salah satu persyaratan di dalam As one of the conditions precedent under the
Common Agreement, Perusahaan juga telah Common Agreement, the Company has also
menandatangani suatu special share undertaking entered into a special share undertaking
agreement pada tanggal 18 April 2017 (Special agreement dated April 18, 2017 (the Special
Share Undertaking Agreement) yang dibuat Share Undertaking Agreement) made between
antara (i) Marubeni Corporation, (ii) Korea (i) Marubeni Corporation, (ii) Korea Midland
Midland Power Co., Ltd., (iii) Samtan, (iv) JERA Power Co., Ltd., (iii) Samtan, (iv) JERA Co., Inc.,
Co., Inc., (v) IIS, (vi) Perusahaan (vii) seluruh (v) IIS, (vi) the Company (vii) all shareholders
pemegang saham yang disebutkan di dalam named in the Special Share Undertaking
Special Share Undertaking Agreement (viii) Agreement, (viii) CEPR, and (ix) Mizuho Bank,
CEPR, dan (ix) Mizuho Bank, Ltd., yang mana Ltd., pursuant to which the Company together
Perusahaan beserta seluruh sponsor dan with the other sponsors and shareholders provide
- 179 -
Page 184
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
pemegang saham telah memberikan janji-janji certain undertakings regarding their ownership
sehubungan dengan kepemilikannya (baik (direct or indirect) in CEPR.
langsung maupun tidak langsung) di CEPR.
b. Pada tanggal 20 Desember 2017, Perusahaan b. On December 20, 2017, the Company signed a
menandatangani Perjanjian Pinjaman Transaksi Loan Facility for Special Transaction Agreement
Khusus dengan PT Bank Mandiri (Persero) Tbk with PT Bank Mandiri (Persero) Tbk (“Mandiri”),
(“Mandiri”), dimana Perusahaan memperoleh wherein the Company obtained revolving working
fasilitas kredit modal kerja berulang dari Mandiri capital facility from Mandiri amounting to
sebesar US$ 50.000.000 (“Fasilitas”). Fasilitas US$ 50,000,000 (“Facility”). The Facility shall be
digunakan untuk membiayai cash flow gap dalam used to finance the cash flow gap to support the
rangka mendukung kegiatan operasional Grup. operational activities of the Group.
Fasilitas ini telah diamandemen beberapa kali, The facility has been amended several times, with
yang terakhir pada tanggal 10 Oktober 2024, latest on October 10, 2024, where the maturity
dimana tanggal jatuh tempo telah diperpanjang date has been extended for another one year
untuk satu tahun kemudian sampai dengan 9 until October 9, 2025.
Oktober 2025.
Berdasarkan perjanjian yang telah Based on the amended agreement, the working
diamandemen, fasilitas modal kerja: capital facility:
a. dikenakan bunga sebesar SOFR ditambah I. bears interest rate at SOFR plus credit
credit adjustment spread ditambah 1,5% adjustment spread, plus 1.5% (Previously: 3
(Sebelumnya: 1,95% di atas LIBOR 3 bulan). months LIBOR plus 1.95%).
b. memuat syarat dan ketentuan tertentu yang II. contains certain terms and conditions that
mengharuskan Perusahaan untuk require the Company to fulfill, among others,
memenuhi, antara lain, sebagai berikut: as follows:
• Memastikan bahwa pada setiap tanggal • Ensure that on each testing date,
pengujian, rasio Consolidated Net Debt Consolidated Net Debt to EBITDA ratio
to EBITDA tidak melebihi 3,75:1; shall not exceed 3.75:1;
• Memastikan bahwa pada setiap tanggal • Ensure that on each testing date, Fixed
pengujian, rasio Fixed Charge Coverage Charge Coverage Ratio (FCCR) shall not
Ratio (FCCR) tidak kurang dari 2,5:1; be less than 2.5:1;
• Memastikan bahwa pada setiap tanggal • Ensure that on each testing date,
pengujian, rasio Priority Indebtedness Priority Indebtedness not more than
tidak melebihi 15% Jumlah Aset; 15% of the Total Assets;
• Memberikan pemberitahuan tertulis • Provide written notification to Mandiri
kepada Mandiri dalam waktu 5 hari kerja within 5 working days after a new
setelah investasi baru dilakukan oleh investment made by the Company;
Perusahaan; akuisisi, merger atau acquisition, merger or divestment; and
divestasi; dan perubahan susunan change in the Company’s board of
direksi dan dewan komisaris directors and commissioners;
Perusahaan;
• Dibatasi untuk bertindak sebagai • Restricted to act as guarantor and
penjamin dan menjaminkan asetnya, pledge its assets, except when they are
kecuali jika diminta oleh bond required by bond indentures existing
indentures yang ada sebelum fasilitas before this working capital facility;
modal kerja ini;
• Terbatas untuk mengubah komposisi • Restricted to change the Company’s
pemegang saham Perusahaan yang shareholder composition which will
akan mengakibatkan perubahan kontrol, result in change of control, as further
seperti yang dijelaskan lebih lanjut pada described in the amendment facility.
amandemen fasilitas.
Persyaratan keuangan pada tiga poin pertama di The financial covenant on the above three bullets
atas akan diuji setiap enam bulan dan dasar points will be tested on a semiannual basis and
perhitungannya berdasarkan periode empat calculation is based on the last four quarters
kuartal terakhir. period.
- 180 -
Page 185
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
Pada tanggal 30 September 2024, jumlah As of September 30, 2024, total outstanding loan
pinjaman yang terutang atas fasilitas ini adalah from the above facility was nil (December 31,
sebesar nihil (31 Desember 2023: 2023: US$29,942,969).
US$29.942.969).
Pada bulan Oktober 2024, Perusahaan menarik In October 2024, the Company made a
pinjaman sebesar US$30.000.000 dari fasiltas ini drawdown of US$30,000,000 from this facility
dan akan jatuh tempo pada bulan November and will be due in November 2024.
2024.
c. Pemberi pinjaman, berdasarkan Common c. d The lenders, pursuant to the Common Agreement
Agreement dan Facility Agreement antara CEP i and Facility Agreement amongst CEP and certain
dan pihak terkait lainnya yang didefinisikan d parties defined as lenders, require the Company
sebagai pihak pemberi pinjaman mengharuskan i as a sponsor and III and IPI as shareholders of
Perusahaan yang bertindak sebagai sponsor, CEP to enter into Equity Support Agreement
serta III dan IPI sebagai pemegang saham CEP, dated March 8, 2010 with Mizuho Corporate
menandatangani Equity Support Agreement Bank, Ltd., as offshore security and
tanggal 8 Maret 2010 dengan Mizuho Corporate administrative agent, and agree on the following:
Bank, Ltd., yang bertindak sebagai offshore
security and administrative agent, dan
menyetujui hal berikut di bawah ini:
1. Sponsor setuju untuk memberikan jaminan 1. Sponsor agrees to guarantee payment of
pembayaran dan bersedia melakukan and, shall cause to contribute to CEP 20% of
pembayaran kepada CEP sebesar 20% dari any unfunded base equity required to be
unfunded base equity sesuai dengan Common contributed to CEP, as specified in the
Agreement. Common Agreement.
2. Sponsor setuju untuk memberikan jaminan 2. Sponsor agrees to give a guarantee payment
pembayaran dan bersedia melakukan and willing to do a payment to CEP of 20%
pembayaran kepada CEP sebesar 20% dari from unfunded contingent equity required to
unfunded contingent equity sesuai dengan be contributed to CEP, as specified in the
Common Agreement. Common Agreement.
3. Sponsor setuju untuk menerbitkan letter of 3. Sponsor agrees to issue standby letter of
credit untuk jaminan pembayaran bilamana credit to secure payment in the event of PLN
terjadi force majeure pada PLN sesuai dengan force majeure in the amount specified in the
perjanjian. agreement.
4. Sponsor setuju untuk memberikan jaminan 4. Sponsor agrees to give a guarantee payment
pembayaran atas tax support amount, sesuai of tax support amount, as defined in the
dengan perjanjian. agreement.
Perjanjian tersebut mencakup beberapa The agreement contains certain covenants that
persyaratan tertentu yang harus dipenuhi oleh the Company is required to fulfill.
Perusahaan.
Berdasarkan perjanjian Share Charge tanggal Based on Share Charge Agreement dated
12 Maret 2010, Perusahaan setuju untuk March 12, 2010, the Company agreed to use the
memberikan jaminan sebagai berikut: following as collateral:
i. Seluruh kepemilikan saham Perusahaan di i. All of the Company’s share in Indika Power
Indika Power Investment Pte. Ltd. (IPI). Investment Pte. Ltd. (IPI).
- 181 -
Page 186
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
ii. Seluruh dividen, bunga dan uang yang ii. All dividends, interest and other money paid
dibayar atau terutang lainnya sehubungan or payable in respect of all of the Company’s
dengan seluruh kepemilikan saham shares in IPI and all other rights, benefits
Perusahaan di IPI dan seluruh hak, manfaat and proceeds in respect of or derived from
dan pendapatan lainnya sehubungan all the Company’s shares in IPI, in favour of
dengan atau yang dihasilkan dari seluruh Mizuho Corporate Bank, Ltd, as “offshore
kepemilikan saham Perusahaan di IPI, security agent”, all its present and future
kepada Mizuho Corporate Bank, Ltd. rights, titles and interest in and to the above
Sebagai “offshore security agent” seluruh collateral, and in each case for the payment
hak, milik dan kepentingan Perusahaan atas and discharge of loan of CEP from Japan
jaminan tersebut diatas, baik saat ini Bank for International Cooperation including
maupun di masa yang akan datang, dalam all cost and expenses to indemnify the
rangka pembayaran atau pelunasan offshore security agent.
pinjaman CEP dari Japan Bank untuk
International Cooperation termasuk seluruh
beban dan biaya untuk mengganti kerugian
kepada offshore security agent.
Berdasarkan Perjanjian Gadai Saham tertanggal Based on Share Pledge Agreement dated
12 Maret 2010, Perusahaan telah menggadaikan March 12, 2010, the Company shall pledge all of
seluruh kepemilikan tidak langsung melalui IPI its shares through IPI and III in CEP, including
dan III di CEP, termasuk seluruh saham any future shares. The Company has further
tambahan di kemudian hari. Perusahaan telah pledged additional share pledge of IPI and III in
menggadaikan saham tambahan atas IPI dan III CEP on February 28, 2019.
di CEP pada tanggal 28 Februari 2019.
d. Pada tanggal 12 April 2018, Perusahaan dan d. On April 12, 2018, the Company and
PT ExxonMobil Lubricants Indonesia (EMLI) PT ExxonMobil Lubricants Indonesia (EMLI)
menandatangani Perjanjian Jual Beli Bahan Bakar entered into Fuel Sales and Purchase Agreement
(Fuel SPA), dimana Perusahaan setuju untuk (Fuel SPA), wherein the Company agrees to
memenuhi kebutuhannya akan bahan bakar source its needs of fuels only from EMLI. The Fuel
hanya dari EMLI. Fuel SPA juga akan antara lain SPA also among others covers the requirement
mengatur tentang kualitas dan kuantitas for quality and quantity of purchase as well as
pembelian serta tingkat harga. Fuel SPA berlaku pricing terms. The Fuel SPA will expire on
sampai dengan tanggal 31 Desember 2039, December 31, 2039, extended for an additional
dapat diperpanjang selama 10 tahun berdasarkan 10 years at mutually agreed terms between both
kesepakatan antara kedua belah pihak. parties.
Pada tanggal 12 April 2018, Perusahaan dan EMLI On April 12, 2018, the Company and EMLI
menandatangani Perjanjian Program Bantuan entered into Marketing Assistance Program
Pemasaran (yang telah diamandemen dari waktu Agreement (as amended from time to time) with
ke waktu), dimana EMLI setuju untuk EMLI, wherein EMLI agrees to provide an
memberikan insentif kepada Perusahaan dalam incentive to the Company in form of marketing
bentuk program bantuan pemasaran (MAP), yang assistance program (MAP), valid until
berlaku sampai dengan tanggal 31 Desember December 31, 2039. Based on the agreement,
2039. Sesuai dengan MAP, EMLI akan membayar EMLI will disburse MAP fund to the Company in
dana MAP kepada Perusahaan sebesar the amount of US$ 10,000,000, to be disbursed
US$ 10.000.000, yang akan dibayarkan dalam in Indonesian Rupiah equivalent and with
mata uang Rupiah serta termin pembayaran yang payment term in accordance with achievement of
disesuaikan dengan tercapainya persyaratan dan certain terms and condition, as specifically
kondisi tertentu, sebagaimana diatur lebih detailed in the MAP agreement.
spesifik dalam Perjanjian MAP.
Perjanjian MAP juga mengatur tentang minimum The MAP agreement also specifies certain
volume pembelian produk yang harus dilakukan minimum products volume purchase required to
oleh Perusahaan, serta mengatur konsekuensi be made by the Company, and regulates
bilamana Perusahaan gagal memenuhi volume consequences, should the Company fails to fulfil
minimum tersebut. such minimum requirement.
Selama tahun 2020, Perusahaan berhasil In 2020, the Company has achieved terms and
mencapai persyaratan dan kondisi tertentu yang conditions required for the first and second stage
diharuskan untuk penagihan tahap pertama dan of billing, and through its subsidiaries billed
kedua. Perusahaan melalui entitas anaknya US$ 7,597,390 to EMLI and recognized as part of
menagih sebesar US$ 7.597.390 kepada EMLI others – net, during the second half of 2020.
dan diakui sebagai bagian dari lain-lain bersih,
- 182 -
Page 187
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
selama semester 2 tahun 2020. Pendapatan dari Revenue from the remaining MAP fund was
sisa dana MAP diakui pada tahun 2021. recognized in 2021.
e. Selain dari fasilitas Pinjaman Transaksi Khusus e. Aside to the facility for Special Transaction
yang diberikan oleh PT Bank Mandiri (Persero) Agreement provided by PT Bank Mandiri (Persero)
Tbk (“Mandiri”) pada Catatan 54b, Perusahaan Tbk (“Mandiri”) in Note 54b, the Company also
juga memperoleh beberapa fasilitas lainnya dari obtained few other facilities from Mandiri, as
Mandiri sebagai berikut: follows:
Fasilitas/ Facility Informasi/ Information Nilai/ Amount
Bank Garansi/ Bank Guarantee ● Fasilitas maksimum / Maximum facility US$ 30.000.000
terdiri dari/ consist of:
(i) Jaminan penawaran/ Bid bond ● Fasilitas maksimum / Maximum facility US$ 30.000.000
(ii) Jaminan pelaksanaan/ Performance bond ● Fasilitas maksimum / Maximum facility US$ 30.000.000
(iii) Jaminan uang muka/ Advance payment bonds ● Fasilitas maksimum / Maximum facility US$ 30.000.000
(iv) Jaminan pembayaran /Payment bond ● Fasilitas maksimum / Maximum facility US$ 30.000.000
(v) Jaminan pemeliharaan /Maintenance bond ● Fasilitas maksimum / Maximum facility US$ 30.000.000
(vi) Jaminan retensi /Retention bond ● Fasilitas maksimum / Maximum facility US$ 30.000.000
(vii) Jaminan pembebasan atau penangguhan pembayaran ● Fasilitas maksimum / Maximum facility US$ 30.000.000
bea masuk /Custom bond
Fasilitas merupakan fasilitas global yang dapat Such facility is a global line facility which can be
digunakan oleh entitas anak tertentu, used by certain subsidiaries, as specifically
sebagaimana ditentukan dalam amandemen agreed in the amended agreement.
perjanjian.
PT POSB Reksabumi Indonesia dan ILSS PT POSB Reksabumi Indonesia and ILSS (both
(keduanya merupakan entitas anak) telah are subsidiaries) have utilized Rp 206,714,064
menggunakan fasilitas NCL global sebesar (due on January 7, 2025) and Rp 6,000,000,000
masing-masing Rp 206.714.064 (jatuh tempo (due on November 15, 2024), from the global
pada tanggal 7 Januari 2025) dan NCL facility.
Rp 6.000.000.000 (jatuh tempo pada tanggal 15
November 2024).
Pada bulan Oktober 2023, PT POSB Reksabumi In October 2023, PT POSB Reksabumi Indonesia
Indonesia telah menggunakan tambahan bank has utilized additional performance bond
garansi sebesar Rp142.500.000 dari fasilitas, guarantee of Rp142,500,000 from the facility,
dimana garansi tersebut berlaku dari tanggal wherein such guarantee is valid from
15 September 2023 sampai dengan 30 Maret September 15, 2023 until March 30, 2024. The
2024. Perusahaan juga telah menggunakan bank Company has also utilized Rp 88,000,000,000
garansi sebesar Rp88.000.000.000 dari fasilitas performance bond guarantee from the same
yang sama dan berlaku dari tanggal 13 Oktober facility, which is valid from October 13, 2023 until
2023 sampai dengan 9 Mei 2024, dimana sebesar May 9, 2024, whererein Rp 56,000,000,000 has
Rp 56.000.000.000 sudah diajukan kembali been proposed for an extension until November
perpanjangannya kepada Mandiri sampai dengan 9, 2024 to Mandiri.
tanggal 9 November 2024.
Pada bulan Oktober 2024, Perusahaan In October 2024, the Company has utilized
menggunakan tambahan fasilitas bank garansi another additional bank guarantee bid bonds
jaminan penawaran dengan jumlah sebesar facility totaling to US$178,500 valid until May 25,
US$178.500 yang akan jatuh tempo pada 25 Mei 2025 in relation to the Company’s participation
2025 terkait dengan partisipasi Perusahaan for bidding of certain project.
dalam tender proyek tertentu.
f. Pada tanggal 21 Januari 2022, Perusahaan f. On January 21, 2022, the Company signed
menandatangani Memorandum of Understanding Memorandum of Understanding together with
bersama dengan PT Industri Baterai Indonesia PT Industri Baterai Indonesia (“IBC”), Hon Hai
(“IBC”), Hon Hai Precision Co. Ltd. (“Foxconn”) Precision Co. Ltd. (“Foxconn”) and Gogoro Inc.
dan Gogoro Inc (“Gogoro”) untuk berkolaborasi (“Gogoro”) to collaborate in the development of
dalam pengembangan ekosistem energi baru sustainable new energy ecosystem in Indonesia
- 183 -
Page 188
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
yang berkelanjutan di Indonesia melalui investasi through investment in battery and electric vehicle
di baterai, kendaraan listrik dan industri and other supporting industries. Such
pendukungnya. Kolaborasi antara pemerintah collaboration between government and private
dan sektor swasta ini akan diimplementasikan sector will be implemented through Build -
melalui skema kerjasama Build – Operate – Operate - Localize (“BOL”) cooperation scheme in
Localize (“BOL”) di Indonesia. Indonesia.
g. Pada tanggal 2 Maret 2023, Perusahaan telah g. On March 2, 2023, the Company has signed a
menandatangani suatu Perjanjian Fasilitas Kredit US$ 250,000,000 Credit Facility Agreement
(Facility Agreement) US$ 250.000.000 (“Facility Agreement”) with (i) the Company's
(“Perjanjian Fasilitas”) bersama dengan (i) para subsidiaries, namely PT Indika Inti Corpindo,
entitas anak Perusahaan, yaitu PT Indika Inti PT Tripatra Multi Energi, PT Tripatra Engineering,
Corpindo, PT Tripatra Multi Energi, PT Tripatra PT Tripatra Engineers and Constructors, and
Engineering, PT Tripatra Engineers and Tripatra (Singapore) Pte. Ltd. as initial
Constructors, dan Tripatra (Singapore) Pte. Ltd. guarantors (ii) PT Bank Mandiri (Persero) Tbk.
sebagai para penanggung awal, (ii) PT Bank ("Bank Mandiri"), PT Bank Negara Indonesia
Mandiri (Persero) Tbk. (“Bank Mandiri”), PT Bank (Persero) Tbk. ("Bank BNI"), PT Bank UOB
Negara Indonesia (Persero) Tbk. (“Bank BNI”), Indonesia ("UOB"), PT Bank DBS Indonesia
PT Bank UOB Indonesia (“UOB”), PT Bank DBS ("DBS"), PT Bank KB Bukopin Tbk. ("KB
Indonesia (“DBS”), PT Bank KB Bukopin Tbk. (“KB Bukopin"), acting individually or jointly as
Bukopin”), bertindak secara sendiri-sendiri atau arrangers (iii) Bank BNI as agent (iv) Bank
bersama-sama, sebagai pengatur (iii) Bank BNI, Mandiri as Guarantee Agent, and (v) Bank
sebagai Agen, (iv) Bank Mandiri sebagai Agen Mandiri and Bank BNI, respectively acting as
Jaminan, dan (v) Bank Mandiri dan Bank BNI, Account Bank.
masing-masing bertindak sebagai Bank
Rekening.
Fasilitas ini mempunyai jangka waktu selama The Facility has a term of 5 years and will be paid
5 tahun dan akan dibayar kembali secara on installment basis, based on schedule as
bertahap, berdasarkan jadwal yang telah further detailed in the Facility Agreement. The
ditentukan dalam Perjanjian Fasilitas. Pinjaman loan was charged with interest at SOFR plus
dikenakan bunga sebesar SOFR ditambah 2,5%, 2.5%, payable on a quarterly basis.
terutang setiap kuartal.
Perjanjian Fasilitas tersebut dijamin secara pari The Facility Agreement is guaranteed on a pari
passu berdasarkan ketentuan-ketentuan dalam passu basis based on the terms of the Indenture
Indenture untuk Surat Utang Senior 5,875% for the 5.875% Senior Notes amounting to
sebesar US$ 575.000.000 dan Surat Utang US$ 575,000,000 and the 8.250% Senior Notes
Senior 8,250% sebesar US$ 675.000.000. amounting to US$ 675,000,000.
Perjanjian Fasilitas ini akan digunakan untuk This Facility Agreement will be used to fund the
pengembangan dan pembangunan Proyek Awak development and construction of the Awak Mas
Mas dari PT Masmindo Dwi Area. Project of PT Masmindo Dwi Area.
Perjanjian Fasilitas memuat syarat dan ketentuan The Facility Agreement has terms and condition
tertentu yang harus dipenuhi oleh Perusahaan, which require the Company to fulfill, including
termasuk pemenuhan rasio keuangan tertentu. maintaining certain financial ratios.
• Memastikan bahwa pada setiap tanggal • Ensure that on each testing date,
pengujian, rasio Consolidated Net Debt to Consolidated Net Debt to EBITDA ratio shall
EBITDA tidak melebihi 3,75:1; not exceed 3.75:1;
• Memastikan bahwa pada setiap tanggal • Ensure that on each testing date, Fixed
pengujian, rasio Fixed Charge Coverage Ratio Charge Coverage Ratio (FCCR) shall not be
(FCCR) tidak kurang dari 2,5:1; less than 2.5:1;
• Memastikan bahwa pada setiap tanggal • Ensure that on each testing date, Priority
pengujian, rasio Priority Indebtedness tidak Indebtedness not more than 15% of the Total
melebihi 15% Jumlah Aset; Assets;
Tanggal pengujian persyaratan keuangan Testing date of the above financial covenant is on
tersebut diatas adalah pada hari terakhir bulan the last day of March, June, September and
Maret, Juni, September dan Desember. December. Calculation is based on the last four
Perhitungan berdasarkan periode empat kuartal quarters period.
terakhir.
- 184 -
Page 189
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
Pada tanggal 30 September 2024, Perusahaan As of September 30, 2024, the Company has
telah menggunakan US$162 juta dari fasilitas made a drawdown of US$162 million of the
yang diberikan (31 Desember 2023: US$ 62 provided facility (December 31, 2023: US$ 62
juta). million).
h. Pada tanggal 28 Desember 2023, Perusahaan h. On December 28, 2023, the Company signed a
menandatangani suatu Perjanjian Fasilitas US$ 300,000,000 Facility Agreement (“Facility
(“Perjanjian Fasilitas”) senilai US$ 300.000.000, Agreement”), together with (i) subsidiaries of the
bersama dengan (i) para entitas anak dari Company, namely IIC, TIME, TPEC, TPE, TRIS, as
Perusahaan, yaitu IIC, TIME, TPEC, TPE, dan original guarantors, (ii) PT Bank Negara
TRIS, sebagai para penanggung awal, Indonesia (Persero) Tbk (“BNI”) and PT Bank
(ii) PT Bank Negara Indonesia (Persero) Tbk Mandiri (Persero) Tbk. ("Mandiri") as the
(“BNI”) and PT Bank Mandiri (Persero) Tbk. arranger (whether acting individually or
("Mandiri") bertindak secara sendiri-sendiri atau collectively, (iii) BNI as agent, (iv) Mandiri as
bersama-sama, sebagai pengatur, (iii) BNI security agent and (v) BNI and Mandiri as
sebagai agen, (iv) Mandiri sebagai agen jaminan account bank.
dan (v) BNI dan Mandiri sebagai bank rekening.
Berdasarkan Perjanjian Fasilitas, Mandiri dan BNI Under the Facility Agreement, Mandiri and BNI
berkomitmen untuk menyediakan pinjaman committed to provide US$ 300,000,000 loans
sebesar US$ 300.000.000 ("Jumlah Komitmen") (“Total Commitment”) to the Company, with
kepada Perusahaan, dengan alokasi pinjaman allocation of each US$ 150,000,000.
masing-masing sebesar US$ 150.000.000.
Pinjaman tersebut akan digunakan untuk The loans shall be used to (1) fund the full
(1) melunasi seluruh pokok utang obligasi VI, repayment of Notes VI and for the payment of
premi, dan/ atau bunga terutang terkait dengan any premiums or accrued interest in relation to
utang obligasi VI; (2) mendanai pembelian utang the Notes VI; (2) fund open market repurchase
obligasi VII dari pasar terbuka dan pembayaran of Note VII and for the payment of any premiums
premia tau bunga terutang terkait dengan utang or accrued interest in relation to Note VII; and
obligasi VII dan (3) membayar biaya terkait dan (3) pay fees, expenses and costs incurred in
pengeluaran yang timbul dengan Perjanjian connection with this Facility Agreement.
Fasilitas ini.
Perusahaan harus membayar kembali pinjaman The Company shall repay the aggregate loans in
melalui angsuran triwulanan yang dimulai sejak quarterly installments starting from March 31,
tanggal 31 Maret 2024, berdasarkan jadual 2024, based on installment schedules as further
pembayaran yang telah disepakati dalam detailed in the Facility Agreement until final
Perjanjian Fasilitas sampai dengan tanggal repayment date, which is the earlier between 5th
pembayaran akhir, yang mana lebih dulu antara anniversary from the signing date or
ulang tahun kelima sejak tanggal December 31, 2028.
penandatanganan perjanjian atau 31 Desember
2028.
Pinjaman tersebut dikenakan bunga SOFR 3 The loans bear interest at SOFR 3 months plus
bulan ditambah 1,55% per tahun. Bunga 1.55% per annum. Interest is paid on a quarterly
dibayarkan setiap triwulan. basis.
Pinjaman tersebut dijamin dengan saham The loans are secured by pledge of the
Perusahaan di IIC, KJA, TPEC dan TPE; Saham Company’s shares in IIC, KJA, TPEC and TPE;
TPEC di TRIS; Saham IIC di KJA; dan Gadai TPEC’s shares in TRIS; IIC’s shares in KJA; and
Rekening milik Perusahaan. Perusahaan juga an Account Pledge by the Company. The
akan dibatasi untuk menjual, mengalihkan, atau Company shall also be restricted to sell, transfer,
melepaskan saham langsung atau tidak langsung or dispose its direct or indirect shares in KJA
di KJA yang akan menyebabkan kepemilikannya which shall cause its ownership to be less than
kurang dari 65% dari jumlah saham KJA. Apabila 65% of the total shares in KJA. Except in case of
pelepasan ini merupakan permintaan such disposition which is required pursuant to a
pemerintah, peraturan atau perintah lainnya, government order, regulation or other directive,
Consolidated Debt to EBITDA Ratio setelah the Consolidated Debt to EBITDA Ratio upon such
pelepasan ini tidak boleh melebihi 3,00 : 1,00. disposal would not be greater than 3.00 to 1.00.
Perjanjian Fasilitas memuat syarat dan ketentuan The Facility Agreement contains certain terms
tertentu yang harus dipenuhi oleh Perusahaan, and conditions that require the Company to fulfill,
antara lain, sebagai berikut: among others, as follows:
- 185 -
Page 190
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
• Menjaga Fixed Charge Coverage Ratio • Maintain Fixed Charge Coverage Ratio at the
minimal 2,50 : 1,00; minimum of 2.50 : 1.00;
• Menjaga Consolidated Net Debt dibagi EBITDA • Maintain Consolidated Net Debt to EBITDA
tidak lebih dari 3,75 : 1,00; dan not more than 3.75 : 1.00; and
• Menjaga Priority Indebtedness tidak melebihi • Maintain Priority Indebtedness not more than
15% dari jumlah aset; 15% of the Total Assets;
Persyaratan keuangan pada tiga poin di atas akan The financial covenant on the above three bullet
diuji pada tanggal terakhir bulan Maret, Juni, points will be tested on the last day of March,
September dan Desember setiap tahunnya June, September and December each year
(“Tanggal Uji”) dan perhitungan berdasarkan (“Testing Date”) and calculation is based on the
periode dua belas bulan yang berakhir pada period of twelve months that end on the relevant
Tanggal Uji yang bersangkutan. Testing Date.
Pada bulan Maret 2024, Perusahaan In March 2024, the Company entered into the
menandatangani amandemen perjanjian pertama first amendment agreement to extend the
untuk memperpanjang jangka waktu availability period of the facility and to change the
ketersediaan fasilitas dan mengubah tanggal first repayment date to June 30, 2024.
pembayaran pertama menjadi 30 Juni 2024.
Pada tanggal 29 April 2024, Perusahaan sudah As of April 29, 2024, the Company has fully
melakukan penarikan penuh atas fasilitas yang drawn the provided facility, with outstanding
diberikan, dengan saldo terutang sebesar US$ balance of US$ 295.000.000 as of September 30,
295.000.000 pada tanggal 30 September 2024. 2024.
i. Pada Desember 2023, Perusahaan dan Infraco i. In December 2023, the Company and Infraco
memenangkan tender untuk merancang, won the bid to design, construct, develop,
membangun, mengembangkan, mengoperasikan operate and maintain a number of utility-scale
dan memelihara sejumlah proyek tenaga surya solar power projects with battery, which are
skala utilitas hybrid dengan baterai, yang expected to have an aggregate installed capacity
diharapkan memiliki kapasitas terpasang agregat of approximately 102 MWp solar and 252 MWh
sekitar 102 MWp solar ditambah 252 MWh baterai battery, and to be located in Sulawesi, Maluku,
dan berlokasi di Sulawesi, Maluku, Nusa Nusa Tenggara, and Papua, Indonesia, in
Tenggara, dan Papua, Indonesia, sehubungan connection with PLN’s de-dieselization project.
dengan proyek de-dieselisasi PLN. Perusahaan The Company and Insfraco agreed to participate
dan Infraco setuju untuk berpartisipasi masing- at 72.25% and 12.75%, respectively, in the
masing sebesar 72,25% dan 12,75% dalam project, meanwhile PT PLN Indonesia Power (PLN
proyek, sementara PT PLN Indonesia Power (PLN IP) participates at 15%. The structure of the
IP) akan berpatisipasi sebesar 15%. Struktur project, including the potential establishment of
proyek, termasuk potensi pembentukan a jointly held project company, is under
perusahaan proyek bersama, sedang dibahas discussion between the Company, Infraco, and
antara Perusahaan, Infraco, dan PLN IP. PLN IP.
Sehubungan dengan proyek di atas, Perusahaan In relation to the above project, the Company
menggunakan bank garansi bid bond (BG) dari utilized the bank guarantee bid bond (BG) from
fasilitas pinjaman non-tunai yang disediakan oleh non-cash loan facility provided by Bank Mandiri
Bank Mandiri (Catatan 54e), dimana Infraco, (Note 54e), wherein Infraco, through its bank,
melalui banknya, menerbitkan counter guarantee provides counter guarantee at 15% of the BG
sebesar 15% dari nilai BG kepada Bank Mandiri. amount to Bank Mandiri.
j. Pada tanggal 4 April 2024, Perusahaan j. On April 4, 2024, the Company signed a credit
menandatangani perjanjian kredit dengan PT agreement with PT Bank KEB Hana Indonesia
Bank KEB Hana Indonesia (KEB), dimana KEB (KEB), wherein KEB provided the Company with
memberikan fasilitas committed standby letter of a committed standby letter of credit (SBLC)
credit (SBLC) kepada Perusahaan terkait dengan related to the Company’s sponsor guarantee in
Penjaminan Sponsor di proyek CEPR. Fasilitas ini CEPR project. The facility is valid for a period of
berlaku untuk periode 12 bulan sampai dengan 12 months until April 16, 2025 and is fully
16 April 2025 dan dijamin sepenuhnya dengan secured by a time deposit of US$5,806,250
deposito berjangka sebesar US$5.806.250 yang placed with KEB (Note 6).
ditempatkan di KEB (Catatan 6).
Pada bulan Juli 2024, Perusahaan mendapatkan In July 2024, the Company obtained another
fasilitas committed SBLC tambahan dari KEB committed SBLC from KEB related to the
terkait dengan Penjaminan Sponsor untuk proyek Company’s sponsor guarantee for CEP project.
CEP. Fasilitas ini berlaku untuk periode 6 bulan The facility is valid for a period of 6 months until
sampai dengan 21 Januari 2025 dan dijamin January 21, 2025 and is fully secured by a time
sepenuhnya dengan deposito berjangka sebesar deposit of US$3,260,000 placed with KEB. This
- 186 -
Page 191
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
US$3.260.000 yang ditempatkan di KEB. SBLC ini SBLC was used to partially replace cash
digunakan untuk menggantikan sebagian guarantee currently provided by the Company, as
jaminan kas yang saat ini diberikan oleh discussed in Note 52.
Perusahaan, sebagaimana dijelaskan dalam
Catatan 52.
k. Pada tanggal 24 Juli 2024, Perusahaan k. On July 24, 2024, the Company signed
menandatangani surat fasilitas tanpa ikatan uncommitted facility letter with Standard
dengan Standard Chartered Bank, Cabang Chartered Bank, Indonesia Branch (SCB),
Indonesia (SCB), dimana SCB memberikan wherein SCB provides short-term loan facility
fasilitas pinjaman jangka pendek dengan pagu with credit limit of US$25,000,000 for a
kredit sebesar US$25.000.000, dengan jangka maximum tenor of one year. The loan bears
waktu maksimum 1 tahun. Pinjaman dikenakan interest at 1.5% above bank’s cost of fund.
bunga sebesar 1,5% diatas cost of fund bank.
Pinjaman dapat digunakan untuk tujuan umum Proceeds shall be applied towards general
perusahaan atau keperluan modal kerja, namun corporate purpose or working capital
tidak dapat digunakan untuk bisnis apapun yang requirements, but cannot be used for any coal
terkait dengan batubara. related business.
Pada tanggal 30 September 2024, Perusahaan On September 30, 2024, the Company has fully
telah melakukan penarikan pinjaman penuh drawn US$25,000,000 from the facility. Such
sebesar US$25.000.000 dari fasilitas. Pinjaman loan will be due on March 31, 2025.
ini akan jatuh tempo pada tanggal 31 Maret 2025.
l. TPEC mempunyai komitmen untuk melaksanakan l. TPEC has construction work and construction
pekerjaan konstruksi dan jasa konsultasi consultant services commitments with several
konstruksi sebagai berikut: customers as follows:
Tenggang waktu/ Period expected
Nilai kontrak/ Mulai proyek/ Selesai proyek/
No. Nama proyek/ Project Contract value Pemberi kerja/ Owner Start of project End of project
1 Onshore LNG Engineering, Procurement and USD 2.436.061.053 BP Berau, Ltd 25 Agustus 2016/ 1 Agustus 2025/
Construction (EPC) Contract for Tangguh IDR 31.929.869.039.538 August 25, 2016 August 1, 2025
Expansion Project EUR 294.416.663
JPY 21.196.498.508
2 Mobile Power Plant Nias (25 MW) - O&M IDR 103.665.082.510 PT PLN Nusantara Power 9 November 2019/ 18 Juli 2025/
USD 7.924.626 November 9, 2019 July 18, 2025
3 Engineering, Procurement and Construction USD 41.420.000 Star Energy Geothermal Salak, Ltd 17 Juni 2021/ 16 Maret 2025/
Contract for the Salak Power Plant Upgrade June 17, 2021 March 16, 2025
4 FEED Phase 2 of Upstream CPF Facilities & USD 14.898.582 Papua LNG Development Pte. Ltd 6 Maret 2023/ 6 Mei 2025/
Wellpad (Package 1) Elk-Antelope March 6, 2023 May 6, 2025
Development, Papua LNG Development
Project (Total PNG)
5 Engineering, Procurement & Construction USD 7.847.502 Medco E&P Grissik, Ltd 28 Juli, 2023/ 27 Januari, 2026/
Dayung Facility Optimization (DFO) Project July 28, 2023 January 27, 2026
6 EPC Pembangunan SP ABG Stage 1 di USD 63.900.000 PT Pertamina EP 23 November 2023/ 16 Juni 2025/
Lapangan Akasia Bagus November 23, 2023 June 16, 2025
7 Engineering, Procurement and Construction IDR 700.000.000.000 PT Shell Manufacturing Indonesia 22 September, 2023/ 22 Oktober, 2027/
Contract for the Chrysalis Project September 22, 2023 October 22, 2027
8 EPC CONTRACT of Revamp Ammonia IDR 840.000.000.000 PT Pupuk Kalimantan Timur 24 November 2023/ 24 November 2027/
Plant-2 Project November 24, 2023 November 24, 2027
9 AGPA Refinery Complex Project IDR 992.291.700.726 PT AGPA Refinery Complex 29 Februari 2024/ 30 Juni 2025/
February 29, 2024 June 30, 2025
10 FEED Services Contract of Polypropylene USD 11.400.000 PT Polytama Propindo 22 Juli 2024/ 22 Mei 2025/
Plant Balongan Project July 22, 2024 May 22, 2025
11 EPC Contract for an LCO2 Plant witj a Capacity USD 33.000.000 PT Kaltim Parna Industri 1 Agustus 2024/ 1 Agustus 2026/
300 Tons/Days August 1, 2024 August 1, 2026
12 Project and Construction Management IDR 34.706.641.400 PT Vale Indonesia Tbk 1 September 2024/ 31 Agustus 2026/
Services Sorowako Limonite September 1, 2024 August 31, 2026
m. Pada tanggal 30 September 2024, TPEC memiliki m. As of September 30, 2024, TPEC has credit
fasilitas kredit dari PT Bank Mandiri (Persero) facilities from PT Bank Mandiri (Persero) Tbk, as
Tbk, sebagai berikut: follows:
- 187 -
Page 192
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
Fasilitas/ Facility Informasi/ Information Nilai/ Amount
Kredit Modal Kerja/ • Fasilitas maksimum/ US$ 28.400.000
Working Capital Loan Maximum facility
• Tingkat bunga per tahun/ USD - SOFR 1 month + 3,7%
Interest rate per annum IDR - JIBOR 1 month + 3,75%
• Biaya structuring/ During covenant breach
Structuring fee USD - SOFR 1month + 3,95%
IDR - JIBOR 1 month + 4,00%
US$ 24.350
Pinjaman non-cash/ • Fasilitas maksimum/ US$ 235.000.000
Non-cash loan Maximum facility
• Jenis/ Bank garansi, Letter of credit/
Type Bank guarantee, Letter of credit
• Structuring fee/ US$ 45.000
Structuring fee
• Biaya penerbitan bank garansi/ 0,35% - 0,75%
Provision for bank guarantee
• Biaya penerbitan SKBDN (Letter 0,125% datar/ flat
of Credit)/
Provision for letter of credit
Tanpa persetujuan tertulis dari Bank, TPEC TPEC is restricted to, among other things: transfer
dibatasi antara lain untuk: mengalihkan aset assets used as collateral, obtain new credit facilities
yang telah diagunkan, memperoleh pinjaman from other financial institution except in the normal
baru dari lembaga keuangan lain kecuali dalam course of business and transfer its rights and
rangka usaha normal, mengalihkan hak atau obligations in this loan agreement to another party
kewajiban atas pinjaman ini kepada pihak lain. without written consent from the Bank. TPEC is also
TPEC juga disyaratkan untuk memenuhi rasio required to maintain financial ratios as stipulated in
keuangan yang disebutkan dalam perjanjian. the agreement.
Fasilitas pinjaman non cash di atas juga dapat The above non-cash loan facilities may also be
digunakan oleh TPE dengan batas pagu bersama used by TPE with joint limit of a US$ 235 million.
sebesar US$ 235 juta. Pada 30 September 2024, As of September 30, 2024, non cash loan facility
fasilitas pinjaman non cash berupa bank garansi in form of bank guarantee and letter of credit
dan letter of credit yang telah digunakan used by TPEC for certain projects amounted to
oleh TPEC untuk proyek-proyek tertentu sebesar US$ 138,451,302 (December 31, 2023:
US$ 138.451.302 (31 Desember 2023: US$ 102,993,605).
US$ 102.993.605).
Fasilitas kredit modal kerja mengandung The working capital loan facilities contain a
persyaratan yang menyatakan bahwa TPEC wajib covenant stating that TPEC is required to
memelihara financial ratio covenant tertentu maintain certain financial ratio covenant, being:
berupa: debt-to-equity ratio maksimal sebesar debt-to-equity ratio of maximum 250%, current
250%, rasio lancar minimal sebesar 110% dan ratio of minimum 110% and debt service
debt service coverage ratio sebesar minimal 2 coverage ratio of minimum 2 times.
kali.
TPEC memenuhi seluruh financial ratio covenant TPEC meets all financial ratio covenant as of
pada 30 September 2024. September 30, 2024.
Fasilitas kredit modal kerja yang telah digunakan Working capital loan facilities used by TPEC as of
oleh TPEC pada 30 September 2024 sebesar September 30, 2024 amounted to US$ 17,483,289
US$ 17.483.289 (31 Desember 2023: (December 31, 2023: US$ 17,475,350).
US$ 17.475.350).
Fasilitas pinjaman non kas yang telah digunakan Non cash loan facilities used by TPEC as of
oleh TPEC pada 30 September 2024, sebesar September 30, 2024 amounted to
US$ 146.024.097 (31 Desember 2023: US$ 146,024,097 (December 31, 2023: US$
US$ 111.482.731). 111,482,731).
- 188 -
Page 193
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
n. Pada tanggal 30 September 2024, TPEC memiliki n. As of September 30, 2024, TPEC has credit
fasilitas kredit dan fasilitas treasury dari The facilities and treasury facilities from The
Hongkong and Shanghai Banking Corporation Hongkong and Shanghai Banking Corporation
Limited yaitu fasilitas limit gabungan sebesar Limited with combined limit amounting to
US$ 5 juta untuk sub-limit dalam fasilitas US$ 5 million with sub limits as follows:
berikut:
Fasilitas/ Facility Informasi/ Inform ation Nilai/ Am ount
Kredit Berdokumen/ Docum entary Credit ● Fasilitas maksimum/ Maxim um facility US$ 5.000.000
● Komisi/ Com m ission 0,25% per kwartal, minimal US$ 50/Rp 750,000
0.25% per quarter, m inim um US$ 50/Rp 750,000
Kredit Berdokumen dengan Pembayaran ● Fasilitas maksimum/ Maxim um facility US$ 5.000.000
Tertunda/ Deferred Paym ent Credit ● Komisi/ Com m ission 0,25% per kwartal, minimal US$ 50/Rp 750,000
0.25% per quarter, m inim um US$ 50/Rp 750,000
Pembiayaan Impor 1/ Clean Im port Loan 1 : ● Fasilitas maksimum / Maximum facility US$ 5.000.000 or eq. Rp 65,000,000,000
● Bunga / Interest (USD) 7% per tahun/ 7% per annum (floating rate)
below Bank's BLI
● Bunga / Interest (USD) 4% per tahun/ 4% per annum (floating rate)
below Bank's BLI
Bank Garansi/ Bank Guarantee ● Fasilitas maksimum / Maximum facility US$ 5.000.000
● Komisi / Commissions 0,75% per tahun, minimal US$ 50/Rp 1,700,000
0.75% per annum, minimum US$ 50/Rp 1,700,000
terdiri dari/ consist of:
(i) Jaminan penawaran/ Tender Bonds ● Fasilitas maksimum / Maximum facility US$ 5.000.000
● Komisi / Commissions 0,75% per tahun, minimal US$ 50/
0.75% per annum , m inim um US$ 50
(ii) Jaminan pelaksanaan/ Performance bonds ● Fasilitas maksimum / Maximum facility US$ 5.000.000
● Komisi / Commissions 0,75% per tahun, minimal US$ 50/
0.75% per annum , m inim um US$ 50
(ii) Jaminan Pembayaran di Depan/ Advance ● Fasilitas maksimum / Maximum facility US$ 5.000.000
Payment Bonds ● Komisi / Commissions 0,75% per tahun, minimal US$ 50/
0.75% per annum, minimum US$ 50
Supply Chain Solutions ● Jenis/Type Uncommitted & Unadvised
● Tingkat bunga / Interest rate IDR: TL2 - 5.1% per annum
USD: TL2 - 8.65% per annum
Treasury Facility ● Fasilitas maksimum / Maximum facility US$ 5.000.000
● Jatuh tempo maksimum / Maximum maturity 1 tahun / 1 year
Fasilitas kredit dari HSBC merupakan perjanjian Credit facility from HSBC is a continuing
yang berkelanjutan dan tetap berlaku kecuali agreement and remains valid unless HSBC cancel
HSBC membatalkan fasilitas tersebut. the facility.
TPEC diharuskan tetap menjaga current ratio TPEC shall maintain its current ratio at a minimum
minimum 1,0 kali, dan menjaga gearing ratio of 1.0 times and gearing ratio at a maximum of
maksimum 1,0 kali. TPEC juga diharuskan untuk 1.0 times. TPEC shall also maintain a minimum
menjaga saldo kas sebesar US$ 5 juta setiap cash balance of US$ 5 million at the end of the
akhir tahun. TPEC telah memenuhi persyaratan fiscal year. TPEC complied with this requirements.
tersebut.
Pada 30 September 2024, fasilitas bank garansi As of September 30, 2024, HSBC bank guarantee
HSBC yang digunakan oleh TPEC adalah sebesar facilities used by TPEC amounted to US$ 782,054
US$ 782.054 (31 Desember 2023: US$ 782.054). (December 31, 2023: US$ 782,054).
o. Pada tanggal 30 September 2024, TPE o. As of September 30, 2024, TPE has consulting
mempunyai komitmen untuk melaksanakan services commitments for construction work as
pekerjaan jasa konsultasi konstruksi sebagai follows:
berikut:
- 189 -
Page 194
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
Tenggang waktu/ Period expected
Nilai kontrak/ Mulai proyek/ Selesai proyek/
No. Nama proyek/ Project Contract value Pemberi kerja/ Owner Start of project End of project
1 Onshore LNG Engineering, Procurement and USD 2.436.061.053 BP Berau, Ltd 25 Agustus 2016/ 1 Agustus 2025/
Construction (EPC) Contract for Tangguh IDR 31.929.869.039.538 August 25, 2016 August 1, 2025
Expansion Project EUR 294.416.663
JPY 21.196.498.508
2 Jasa Pengawasan Konstruksi Utara-Paket A IDR 736.945.000.000 PT Pertamina Hulu Rokan 27 Mei 2022/ 26 Mei 2025/
May 27, 2022 May 26, 2025
3 Pengadaan Maintenance Support Services IDR 35.010.114.411 PT Pertamina EP Cepu Regional 4 30 Oktober 2023/ 30 Oktober 2026/
Zona 12 October 30, 2023 October 30, 2026
4 Engineering Services IDR 13.500.000.000 PT Saipem Indonesia 1 Februari 2024/ 31 Januari 2026/
February 1, 2024 January 31, 2026
5 Jasa Analisa & Study Engineering Structure IDR 620.000.000 PT Trans-Pacific Petrichemical 12 September 2024/ 30 April 2025/
Tower CCR Indotama September 12, 2024 April 30, 2025
p. Pada tanggal 30 September 2024, TPE memiliki p. As of September 30, 2024, TPE has credit
fasilitas kredit dari PT Bank Mandiri (Persero) facilities from PT Bank Mandiri (Persero) Tbk (the
Tbk, (“Bank”) sebagai berikut: “Bank”) as follows:
Fasilitas/ Facility Informasi/ Information Nilai/ Amount
Pinjaman non cash / ● Fasilitas maksimum/ Maximum facility US$ 235.000.000
Non cash loan ● Jenis/ Type Bank garansi, Letter of credit /
Bank guarantee, Letter of credit
● Structuring fee / Structuring fee US$ 45.000
● Biaya penerbitan bank garansi/ Provision for bank guarantee 0,35% - 0,75%
● Biaya penerbitan SKBDN (Letter of Credit )/Provision for letter of credit 0,125% datar/ flat
Pinjaman berjangka/ ● Fasilitas maksimum/ Maximum facility Rp 99.000.000.000
Term loan ● Tingkat bunga per tahun/ Interest rate per annum JIBOR 3 months + 4.55%
0,5% dari limit fasilitas/
● Upfront fee / Upfront fee 0,5% of facility limit
Tanpa persetujuan tertulis dari Bank, TPE TPE is restricted to, among other things: transfer
dibatasi antara lain untuk: mengalihkan aset assets used as collateral, obtain new credit
yang telah diagunkan, memperoleh pinjaman facilities from other financial institution except in
baru dari lembaga keuangan lain kecuali dalam the normal course of business and transfer its
rangka usaha normal, mengalihkan hak atau rights and obligations in this loan agreement to
kewajiban atas pinjaman ini kepada pihak lain. another party without written consent from the
TPE juga disyaratkan untuk memenuhi rasio Bank. TPE is also required to maintain financial
keuangan yang disebutkan dalam perjanjian. ratios as stipulated in the agreement.
Fasilitas pinjaman non cash merupakan fasilitas Non cash loan facility is owned by TPEC, can also
yang dimiliki oleh TPEC, juga dapat dipakai oleh be used by TPE with joint limit of
TPE dengan batas pagu bersama sebesar US$ 235 million. As of September 30, 2024, non
US$ 235 juta. Pada tanggal 30 September 2024, cash loan facility in form of bank guarantee used
fasilitas pinjaman non cash berupa bank garansi by TPE for certain projects amounted to
yang telah digunakan oleh TPE untuk proyek- US$ 7,572,794 (2022: US$ 8,489,126).
proyek tertentu sebesar US$ 7.572.794 (2023:
US$ 8.489.126).
Perjanjian fasilitas pinjaman berjangka telah The term loan facility agreement has expired on
berakhir pada tanggal 23 September 2024 dan September 23, 2024 and TPE has fulfilled all its
TPE telah memenuhi semua kewajibannya obligations to Bank Mandiri.
kepada Bank Mandiri.
q. Pada tanggal 3 Mei 2021, PT Mekko Metal Mining q. On May 3, 2021, PT Mekko Metal Mining
(“Mekko”), PT Perkasa Investama Mineral (“PIM”) (“Mekko”), PT Perkasa Investama Mineral
dan PT Petrosea Tbk (“Kontraktor”), telah (“PIM”) and PT Petrosea Tbk (“the Contractor”)
menandatangani Perjanjian Kerjasama untuk have executed a Cooperation Agreement for a
pengembangan proyek penambangan bauksit di development of bauxite mining project in which
mana PIM bertindak sebagai penjamin atas PIM act as Mekko’s payment guarantor. Such
pembayaran oleh Mekko. Perjanjian Kerjasama Cooperation Agreement has been amended
telah diubah beberapa kali, dengan perubahan several times, with latest amendment on July 15,
terakhir tanggal 15 Juli 2022. 2022.
- 190 -
Page 195
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
Pelaksanaan Perjanjian Kerjasama tersebut Execution of the Cooperation Agreement is
dijamin dengan Perjanjian Gadai Saham secured by a Pledge of Share Agreement dated
tertanggal 3 Mei 2021 di mana PIM telah May 3, 2021 where PIM has pledged its 51%
menjaminkan 51% kepemilikan sahamnya di ownership in Mekko to the Contractor as a
Mekko kepada Kontraktor sebagai jaminan security of its obligation to the Contractor.
atas kewajibannya kepada Kontraktor. Pada On July 20, 2022, PIM and Mekko has
tanggal 20 Juli 2022, PIM dan Mekko submitted a notification to the Contractor to pay
menyampaikan pemberitahuan kepada Rp 17,221,673,163 (equivalent to
Kontraktor untuk melakukan pembayaran US$ 1,094,760) to release 5% of PIM’s share in
sebesar Rp 17.221.673.163 (setara dengan Mekko pledged to the Contractor. Further to such
US$ 1.094.760) untuk melepaskan 5% saham payment, PIM, Mekko and the Contractor has
milik PIM di Mekko yang digadaikan kepada signed an Amendment to Pledge of Share
Kontraktor. Sebagai kelanjutan dari pembayaran Agreement on August 15, 2022 to state such
tersebut, PIM, Mekko dan Kontraktor release, thus remaining of PIM’s shares in Mekko
menandatangani suatu Amandemen atas pledged to the Contractor is 46%.
Perjanjian Gadai Saham pada tanggal 15 Agustus
2022 untuk menyatakan pelepasan tersebut,
sehingga sisa saham PIM di Mekko yang
digadaikan kepada Kontraktor adalah sebesar
46%.
Pada tanggal 31 Agustus 2023, Mekko, PIM, dan On August 31, 2023, Mekko, PIM, and the
Kontraktor telah sepakat dan menandatangani Contractor has agreed to enter into Statement
Surat Pernyataan Pengakhiran Perjanjian Letter for Termination of Cooperation
Kerjasama. Atas pengakhiran ini, Mekko akan Agreement. For the termination, Mekko shall pay
melakukan pembayaran atas Kewajiban for the Settlement Obligation to the Contractor in
Penyelesaian kepada Kontraktor sejumlah the amount of US$ 6,000,000, which will be
US$ 6.000.000, yang dibagi menjadi 3 tahap divided into 3 payment terms each for
pembayaran masing-masing sejumlah US$ 2,000,000 with payment schedule at the
US$ 2.000.000 dengan jadwal pembayaran latest for Phase 1 on October 30, 2023, for Phase
selambat-lambatnya untuk Tahap 1 pada 2 on June 30, 2024, and for Phase 3 on
30 Oktober 2023, Tahap 2 pada 30 Juni 2024, November 30, 2024 with condition that the
dan Tahap 3 pada 30 November 2024 dengan Contractor has to release the pledge of shares.
ketentuan Kontraktor sudah harus melakukan
pelepasan gadai saham.
r. Pada tanggal 26 Juli 2022, PT Masmindo Dwi Area r. On July 26, 2022, PT Masmindo Dwi Area
(“Masmindo”) dan Kontraktor menandatangani (“Masmindo”) and the Contractor entered into
Perjanjian Engineering, Procurement dan Engineering, Procurement and Construction
Construction No. 330-800-CN-CCC-0004 Contract No. 330-800-CN-CCC-0004 (“EPC
(“Kontrak EPC”), dimana berdasarkan perjanjian Contract”), wherein under this contract, risk
ini, Kontraktor berkewajiban untuk mengerjakan rests with Contractor to deliver the EPC works
pekerjaan EPC terkait dengan processing plant related to the processing plant at a fixed
dengan nilai kontrak tetap sebesar Rp lumpsum contract price of Rp 1,237,582,690,770
1.237.582.690.770 (setara dengan US$ (equivalent to US$ 78,671,584). The contract
78.671.584). Nilai kontrak dan jadwal tergantung price and schedule will be subject to variation of
pada waktu serta rise and fall atas peralatan yang time and rise and fall restricted to imported
diimpor dan bahan bakar. Berdasarkan equipment and fuel. The commencement date
perjanjian, tanggal permulaan adalah 28 hari under the EPC Contract shall be 28 days after
setelah diterbitkannya Notice to Proceed oleh issuance of Notice to Proceed by Masmindo,
Masmindo, setelah dipenuhinya beberapa kondisi
subject to the fulfilment of several conditions
persyaratan yang ditentukan dalam Kontrak EPC,
precedent stipulated in the EPC Contract, but
namun tidak melebihi tanggal 30 April 2023.
shall be no longer than April 30, 2023.
Pada tanggal 29 Desember 2022, Kontrak EPC On December 29, 2022, EPC contract has been
telah diubah melalui Amandemen I, antara lain amended through the Amendment I, which
mengubah tanggal terakhir penerbitan NTP among others change the latest date for issuing
menjadi 30 April 2023 dan memperkenalkan the NTP to 30 April 2023 and introduce the
konsep Limited Notice to Proceed (“LNTP”) yang concept of Limited Notice to Proceed (“LNTP”) to
akan diterbitkan oleh Masmindo kepada be issued by Masmindo to the Contractor.
Kontraktor.
- 191 -
Page 196
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
Pada tanggal 30 Desember 2022, Masmindo telah On December 30, 2022, Masmindo has issued
menerbitkan LNTP kepada Kontraktor dengan the LNTP to the Contractor with maximum
jumlah maksimum pembayaran termasuk PPN aggregate amount of payments including VAT
sebesar Rp 243.455.471.661, dimana jumlah amounted to Rp 243,455,471,661 where such
tersebut dan setiap pembayaran berdasarkan amount and any payment under the LNTP shall
LNTP merupakan bagian dari nilai kontrak dalam form part of the contract price in the EPC
Kontrak EPC. Contract.
Pada tanggal 3 April 2023, Masmindo telah On April 3, 2023, Masmindo has issued the Notice
menerbitkan Pemberitahuan Perpanjangan LNTP of Extension of LNTP to the Contractor, allowing
kepada Kontraktor, mengubah tanggal terakhir the latest date for issuing the NTP to be by July
penerbitan NTP menjadi 30 Juli 2023. 30, 2023.
Pada tanggal 23 Agustus 2023, Kontrak EPC telah On August 23, 2023, EPC Contract has been
diamendemen lebih lanjut melalui Amendemen further amended through the Amendment II,
II, yang mengubah tanggal terakhir penerbitan which allows the latest date for issuing the NTP
NTP menjadi 1 Januari 2024. to be January 1, 2024.
Pada tanggal 24 Agustus 2023, Masmindo telah On August 24, 2023, Masmindo has issued the
menerbitkan Perpanjangan LNTP No.2 untuk LNTP Extension No.2 to extend the period for
memperpanjang periode pelaksanaan Ruang execution of Limited Scope of Work until
Lingkup Pekerjaan Terbatas (Limited Scope of December 31, 2023 and change the maximum
Work) sampai dengan 31 Desember 2023 dan aggregate amount of payments including VAT
mengubah jumlah maksimum pembayaran under the LNTP to Rp 629,994,152,600, where
termasuk PPN atas LNTP menjadi such amount and any payment under the LNTP
Rp629.994.152.600, dimana jumlah tersebut dan shall form part of the contract price in the EPC
setiap pembayaran berdasarkan LNTP Contract.
merupakan bagian dari nilai kontrak dalam
Kontrak EPC.
Pada tanggal 10 November 2023, Masmindo On 10 November 2023, Masmindo has issued the
menerbitkan NTP dengan Tanggal Pelaksanaan NTP with the Commencement Date to commence
untuk memulai Pekerjaan jatuh pada 8 Desember the Works on 8 December 2023. With issued the
2023. Dengan diterbitkannya NTP, maka semua NTP, then all remaining works in LNTP shall be
pekerjaan yang tersisa didalam LNTP harus rolled into the scope of works NTP to be executed
dimasukkan ke dalam ruang lingkup pekerjaan by instruction of this NTP from the
NTP yang akan dilaksanakan berdasarkan Commencement Date.
instruksi NTP ini sejak Tanggal Mulai.
s. Pada tanggal 26 Juli 2022, Masmindo dan s. On July 26, 2022, Masmindo and the Contractor
Kontraktor menandatangani Perjanjian entered into Construction and Project Management
Construction and Project Management Works Works Contract No. 330-800-CN-CCC-0005
No. 330-800-CN-CCC-0005 (“Kontrak CPM”) (“CPM Contract”) for construction of all Non-
untuk pembangunan seluruh infrastruktur Non- Processing Infrastructure. This is an open book
Processing. Ini adalah kontrak dimana Masmindo contract where Masmindo could have control
mempunyai kendali atas biaya serta kinerja, dan over costs and performance and the CPM
Kontrak CPM akan berdasarkan biaya aktual Contract will be based on actual costs of the
Kontraktor, dengan estimasi total biaya yang Contractor under agreed estimated total cost of
disepakati sebesar Rp 1.658.331.309.400 (setara Rp 1,658,331,309,400 (equivalent to
dengan US$ 105.418.048), termasuk 8% marjin US$ 105,418,048), including 8% margin of the
Kontraktor. tanggal permulaan adalah 28 hari Contractor. The commencement date under the
setelah diterbitkannya Notice to Proceed oleh CPM Contract shall be 28 days after issuance of
Masmindo, setelah dipenuhinya beberapa kondisi Notice Proceed (“NTP”) by Masmindo which shall
persyaratan yang ditentukan dalam Kontrak CPM,
fulfil Conditions Precedent as stipulated in the
namun tidak melebihi tanggal 30 April 2023.
Contract and shall be no longer that 30 April
2023.
Pada tanggal 29 Desember 2022, Kontrak CPM On December 29, 2022, the CPM Contract has
telah diubah melalui Amandemen I, antara lain been amended through the Amendment I, which
mengubah tanggal terakhir penerbitan NTP among others change the latest date for issuing
menjadi 30 April 2023 dan memperkenalkan the NTP to 30 April 2023 and introduce the
konsep Limited Notice to Proceed (“LNTP”) yang concept of Limited Notice to Proceed (“LNTP”) to
akan diterbitkan oleh Masmindo kepada be issued by Masmindo to the Contractor.
Kontraktor.
- 192 -
Page 197
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
Pada tanggal 30 Desember 2022, Masmindo telah On December 30, 2022, Masmindo has issued
menerbitkan LNTP kepada Kontraktor dengan the LNTP to the Contractor with maximum
jumlah maksimum pembayaran termasuk PPN aggregate amount of payments including VAT
sebesar Rp 160.885.530.716 (setara dengan amounted to Rp 160,885,530,716 (equivalent
US$ 10.227.292), dimana jumlah tersebut dan US$ 10,227,292), where such amount and any
setiap pembayaran berdasarkan LNTP payment under the LNTP shall form part of the
merupakan bagian dari nilai kontrak dalam contract price in the EPC Contract.
Kontrak EPC.
Pada tanggal 3 April 2023, Masmindo telah On April 3, 2023, Masmindo has issued the Notice
menerbitkan Pemberitahuan Perpanjangan LNTP of Extension of LNTP to the Contractor, allowing
kepada Kontraktor, mengubah tanggal terakhir the latest date for issuing the NTP to be by
penerbitan NTP menjadi 30 Juli 2023. July 30, 2023.
Pada tanggal 23 Agustus 2023, Kontrak EPC telah On August 23, 2023, EPC Contract has been
diamendemen lebih lanjut melalui Amendemen further amended through the Amendment II,
II, yang mengubah tanggal terakhir penerbitan which allows the latest date for issuing the NTP
NTP menjadi 1 Januari 2024. to be January 1, 2024.
Pada tanggal 24 Agustus 2023, Masmindo telah On August 24, 2023, Masmindo has issued the
menerbitkan Perpanjangan LNTP No.2 untuk LNTP Extension No.2 to extend the period for
memperpanjang periode pelaksanaan Ruang execution of Limited Scope of Work until
Lingkup Pekerjaan Terbatas (Limited Scope of December 31, 2023 and change the maximum
Work) sampai dengan 31 Desember 2023 dan aggregate amount of payments including VAT
mengubah jumlah maksimum pembayaran under the LNTP to Rp 313,633,859,536, where
termasuk PPN atas LNTP menjadi such amount and any payment under the LNTP
Rp 313.633.859.536, dimana jumlah tersebut shall form part of the contract price in the EPC
dan setiap pembayaran berdasarkan LNTP Contract.
merupakan bagian dari nilai kontrak dalam
Kontrak EPC.
Pada 10 November 2023, Masmindo telah On November 10, 2023, Masmindo has issued
menerbitkan NTP dengan Tanggal Mulai untuk the NTP with the Commencement Date to
memulai Pekerjaan pada 8 Desember 2023. commence the Works on December 8, 2023.
Dengan diterbitkannya NTP, maka semua With issued the NTP, then all remaining works in
pekerjaan yang tersisa didalam LNTP harus LNTP shall be rolled into the scope of works NTP
dimasukkan ke dalam ruang lingkup pekerjaan to be executed by instruction of this NTP from the
NTP yang akan dilaksanakan berdasarkan Commencement Date.
instruksi NTP ini sejak Tanggal Mulai.
t. Pada tanggal 17 Agustus 2023, Masmindo dan t. On August 17, 2023, Masmindo and PT Petrasys
PT Petrasys Teknologi Indonesia (“Petrasys”) Teknologi Indonesia (“Petrasys”) has entered
telah menandatangani Perjanjian Kerjasama into Cooperation Agreement for Exploration of
Eksplorasi Deposit Tarra. Petrasys akan Tarra Deposit. Petrasys will perform all the
melaksanakan seluruh Pekerjaan geologi dan geological Works and provide full funding for the
menyediakan pendanaan penuh untuk Pekerjaan Works until the amount of US$ 4,000,000.
tersebut hingga sejumlah US$ 4.000.000. Masmindo will pay compensation to Petrasys for
Masmindo akan membayar kompensasi kepada the delivery of the result of the Work.
Petrasys atas penyerahan hasil Pekerjaan.
u. Pada tanggal 1 Juni 2017, ICI memperoleh u. On June 1, 2017, ICI obtained credit facility from
fasilitas kredit dari PT Bank Negara Indonesia PT Bank Negara Indonesia (Persero) Tbk,
(Persero) Tbk, cabang Singapura dengan limit Singapore branch with combined credit limit of
kredit gabungan sebesar US$ 5.000.000. US$ 5,000,000. This loan agreement has been
Perjanjian ini telah diperbarui pada tanggal 3 April amended on April 3, 2024, and valid until March
2024 dan berlaku sampai dengan 20 Maret 2025. 20, 2025. Details of facilities after amendments
Setelah perubahan tersebut, rincian fasilitas yang are as follows:
diberikan adalah sebagai berikut:
- 193 -
Page 198
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
Fasilitas maksimum/ Suku bunga/
Fasilitas/Facility Maximum facility Interest rate Periode/Period
Fasilitas LC/ US$ 7,5 juta/million - 90 hari/ days
Letter of Credit Facility
Trust Receipt Facility US$ 7,5 juta/million 2,50% + SOFR per tahun/ 45 hari/ days
2.50% + SOFR per annum
Invoicing Facility US$ 7,5 juta/million 2,50% + SOFR per tahun/ 90 hari/ days
2.50% + SOFR per annum
v. Pada tanggal 12 Juni 2023, ICI memperoleh fasilitas w. On June 12, 2023, ICI obtained a working capital
kredit modal kerja berupa invoice financing dari credit facility in the form of invoice financing from
Lembaga Pembiayaan Ekspor Indonesia dengan limit Lembaga Pembiayaan Ekspor Indonesia, with a
kredit sebesar US$ 30.000.000. Fasilitas ini limit of US$ 30,000,000. Such facility bears interest
dikenakan tingkat suku bunga sebesar 2,20% + rate of 2.20% + SOFR 3 months, with a maximum
SOFR 3 bulan, dengan jangka waktu pembayaran repayment period of 120 days. This facility has
maksimal selama 120 hari. Perjanjian pinjaman ini been amended on June 11, 2024 and valid until
telah diperbaharui pada tanggal 11 Juni 2024 dan June 12, 2026.
berlaku sampai dengan 12 Juni 2026.
Fasilitas kredit ini mempunyai beberapa persyaratan Such credit facility contains certain financial
keuangan yang harus dipenuhi oleh ICI, antara lain: covenants that requires ICI to fulfil, among others:
• Debt to Equity Ratio harus lebih kecil atau sama • Debt to Equity Ratio should be less than or
dengan 300% equal to 300%
• Debt Service Charge Ratio harus sama atau lebih • Debt Service Coverage Ratio should be equal to
besar dari 100% or greater than 100%
• Ratio jumlah piutang dan uang muka terhadap • Ratio of total accounts receivable and advance
utang dan utang bank jangka pendek harus sama payments, compared to accounts payable and
atau lebih besar dari 100%. short-term bank loan should be equal or
greater than 100%
Pada tanggal 30 September 2024, ICI telah As of September 30, 2024, ICI has fully repaid
melunasi seluruh pinjaman. all loan.
x. Pada tanggal 5 April 2024, ICI dan PT Bank x. On April 5, 2024, ICI and PT Bank Rakyat
Rakyat Indonesia (Persero) Tbk (“BRI”), Cabang Indonesia (Persero) Tbk (“BRI”), Singapore
Singapura menandatangani perjanjian fasilitas, Branch entered into facility agreement, wherein
dimana BRI setuju untuk memberikan fasilitas BRI agreed to provide ICI with the following
berikut kepada ICI: facilities:
• Uncommited LC Issuance Line sejumlah • Uncommitted LC Issuance Line at the amount
US$ 15.000.000 atau setara dalam mata of US$ 15,000,000 or its equivalent in other
uang lain, berlaku 24 bulan terhitung sejak currencies, valid 24 months effective from
penandatanganan fasilitas. Biaya penerbitan signing of the facility. Issuance cost is 1/16%
sebesar 1/16% flat dari LC yang diterbitkan flat of LC issued (minimum of US$ 100).
(minimal US$ 100).
• Fasilitas Uncommited Commercial Line • Uncommitted Commercial Line facility at the
sejumlah US$ 15.000.000 atau setara dalam amount of US$ 15,000,000 or its equivalent
mata uang lain, berlaku 24 bulan terhitung in other currencies, valid 24 months effective
sejak penandatanganan fasilitas. Pinjaman from signing of the facility. The loan bears
ini dikenakan bunga CME Term 1,3,6 bulan interest rate at CME Term 1,3,6-months
SOFR ditambah 2%. Pinjaman ini digunakan SOFR plus 2%. The loan is used to facilitate
untuk memfasilitasi dan membiayai kegiatan and finance trade activities.
perdagangan.
• Fasilitas Modal Kerja Pembeli sebesar • Buyer Working Capital facility at the amount
US$ 15.000.000 atau setara dalam mata of US$ 15,000,000 or its equivalent in other
uang lain, berlaku 24 bulan terhitung sejak currencies, valid 24 months effective from
penandatanganan fasilitas. Pinjaman ini signing of the facility. The loan bears interest
dikenakan bunga CME Term 1,3,6 bulan rate at CME Term 1,3,6-months SOFR plus
SOFR ditambah 2%, pinjaman tersebut 2%, the loan is used to finance import
digunakan untuk membiayai kegiatan impor. activities.
a.
- 194 -
Page 199
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
Jumlah pagu fasilitas gabungan tidak melebihi Total combined limit facility is US$ 15,000,000.
US$ 15.000.000.
Fasilitas ini berisi batasan-batasan tertentu yang The facility contains certain covenants that require
harus dipenuhi oleh ICI. ICI to fulfill.
y. Pada tanggal 20 Oktober 2017, ICI memperoleh y. On October 20, 2017, ICI obtained a credit facility
fasilitas kredit dari PT Bank Mandiri (Persero) Tbk, from PT Bank Mandiri (Persero) Tbk., Singapore
cabang Singapura dengan limit kredit gabungan Branch with maximum facility of US$ 30 million.
sebesar US$ 30.000.000. ICI memperoleh fasilitas This credit facility is obtained by ICI to finance its
ini untuk membiayai kegiatan penjualan dan/atau trading activities and/or its general for working
untuk kebutuhan modal kerja. Perjanjian capital requirement. This loan has been amended
pinjaman ini telah diperbaharui beberapa kali several times most recently in February 2024 and
terakhir pada bulan Februari 2024 dan berlaku valid until April 15, 2025. Details of facilities after
hingga 15 April 2025. Setelah perubahan tersebut, amendments are as follows:
rincian fasilitas yang diberikan adalah sebagai
berikut:
Fasilitas maksimum/ Suku bunga atau komisi/
Fasilitas/Facility Maximum facility Interest rate or commission Periode/Period
Fasilitas modal kerja/ US$ 40 juta/million 2,5% diatas SOFR per tahun/ 180 hari/days
Working capital facility 2.5% above SOFR per annum
Irrevocable Sight Import US$ 40 juta/million 1/16% per bulan atau US$ 40, -
Letters of Credit Facility mana yang lebih tinggi/
1/16% per month or US$ 40,
whichever is higher
Irrevocable Sight Import US$ 10 juta/million 1/16% per bulan atau US$ 40, -
Letters of Credit Facility, mana yang lebih tinggi/
for usage only by related 1/16% per month or US$ 40,
company, Indika Energy whichever is higher
Trading Pte Ltd ("IETPL")
Trust Receipt Financing US$ 40 juta/million 2,5% diatas SOFR per tahun/ 45 hari/days
Facility 2.5% above SOFR per annum
Trust Receipt Financing US$ 10 juta/million 2,5% diatas SOFR per tahun/ 45 hari/days
Facility for usage only by 2.5% above SOFR per annum
related company, Indika
Energy Trading Pte Ltd
("IETPL")
Perjanjian tersebut di atas mencakup beberapa The agreement covering certain covenant which
persyaratan yang harus dipenuhi oleh ICI, antara required ICI to fulfill, among other things:
lain:
a. ICI tidak diperkenankan mengubah a. ICI is not allowed to change the composition
komposisi pemilik saham tanpa persetujuan of shareholders without approval from Bank
dari Bank Mandiri; Mandiri;
b. ICI menyerahkan salinan perubahan b. ICI submits a copy of the agreement with
perjanjian terkait kontrak pembelian dan respect to the contract of purchase and sale
penjualan dengan pemasok dan penjual
with the supplier and the seller within 30 days
dalam waktu 30 hari dari tanggal efektif
from the effective date of the agreement;
perjanjian;
c. Debt Equity Ratio (ratio of its total interest
c. Debt Equity Ratio (rasio atas pinjaman
bearing debt to total equity) shall not exceed
berbunga terhadap total ekuitas) ICI tidak
boleh lebih dari 3:1 dan rasio atas EBITDA 3:1 and the ratio of EBITDA to interest
terhadap beban bunga tidak boleh kurang expense shall not be less than 1.5:1.
dari 1,5:1.
- 195 -
Page 200
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
z. Pada tanggal 14 September 2017, IETPL z. On September 14, 2017, IETPL entered into a
mengadakan Perjanjian Bisnis Batubara dengan Coal Business Cooperation Agreement with
Bellridge Holding Limited (BHL) selama satu Bellridge Holding Limited (BHL) for one year,
tahun, dimana BHL berencana untuk melakukan where BHL plans to invest in coal bussiness
investasi di industri batubara atas nama IETPL. industry on behalf of IETPL. Related to this
Terkait transaksi ini, IETPL telah melakukan transaction, IETPL paid US$ 18,000,000 recorded
pembayaran sebesar US$ 18.000.000 yang as advance for purchase of coal, which IETPL will
dicatat sebagai uang muka pembelian, yang obtain the profit sharing and respective principal
nantinya IETPL akan mendapatkan pengembalian amount from BHL. As of September 30, 2024 and
dalam bentuk profit sharing dari hasil investasi December 31, 2023, the balance of this
yang dilakukan oleh BHL beserta jumlah pokok transaction amounted to US$ 9,665,995 was
yang telah dibayarkan kepada BHL. Pada tanggal recorded in other current asset account.
30 September 2024 dan 31 Desember 2023, nilai
transaksi ini sebesar US$ 9.665.995 dicatat pada
akun aset lancar lainnya.
aa. Pada tanggal 9 September 2016, ILSS aa. On September 9, 2016, ILSS entered into an
menandatangani perjanjian dengan PT Cikarang agreement with PT Cikarang Listrindo Tbk (CL), a
Listrindo Tbk (CL), sebuah perusahaan power plant company, to provide coal handling
pembangkit listrik, untuk menyediakan jasa management services for CL’s power plant
penanganan batubara untuk pembangkit listrik located in Babelan, Bekasi. The agreement
CL yang berlokasi di Babelan, Bekasi. Kontrak expires within 5 years. On March 26, 2021, ILSS
tersebut berakhir dalam 5 tahun. Pada 26 Maret signed Addendum No. 6 with CL, which changes
2021, ILSS menandatangani Addendum No. 6 the validity period of the agreement into up to
dengan CL, yang merubah masa berlaku March 25, 2022, with contract value Rp 137
perjanjian menjadi hingga 25 Maret 2022, billion. On December 30, 2021, ILSS received
dengan nilai kontrak Rp 137 milyar. Pada Notification Letter regarding Contract Extension
30 Desember 2021, ILSS menerima Surat for Coal Handling Management Services Site Plan
Pemberitahuan Perpanjangan Kontrak Pekerjaan PLTU Babelan for period of April 26, 2022 -
Jasa Coal Handling Management Services Site April 25, 2027.
Plan PLTU Babelan untuk periode 26 April 2022 -
25 April 2027.
bb. Pada tanggal 12 April 2018, KGTE bb. On April 12, 2018, KGTE signed storage facility
menandatangani perjanjian jasa fasilitas service agreement with PT Exxonmobil Lubricants
penyimpanan dengan PT Exxonmobil Lubricants Indonesia (Exxon) for 20 years contract duration
Indonesia (Exxon) untuk masa kontrak 20 tahun plus 10 years extension possibility. KGTE will
dengan kemungkinan tambahan perpanjangan serve fuel storage service dedicated to Exxon.
10 tahun. KGTE akan memberikan jasa Based on storage facility agreement as
penyimpanan bahan bakar khusus untuk Exxon. mentioned above, KGTE built fuel storage tanks
Berdasarkan perjanjian KGTE membangun tangki with capacity of 96,000 m3 located in Balikpapan,
penyimpanan bahan bakar untuk kapasitas East Kalimantan and Exxon will pay fixed fee and
96.000 m3 yang berlokasi di Balikpapan, throughput fee as compensation.
Kalimantan Timur dan Exxon akan membayar
fixed fee dan throughput fee sebagai imbalan.
cc. Pada tanggal 29 Desember 2020, Kementerian cc. On December 29, 2020, Ministry of
Perhubungan Republik Indonesia melalui Transportation of Republic of Indonesia through
Direktorat Jenderal Perhubungan Laut telah Directorate General of Sea Transportation has
menunjuk Konsorsium Patimban sebagai Badan appointed Patimban Consortium as Executing
Usaha Pelaksana Proyek Kerja Sama Pemerintah Entity Public Private Partnership of Patimban Port
dengan Badan Usaha Pelabuhan Patimban di in West Java Province (“Patimban Project”).
Provinsi Jawa Barat (“Proyek Patimban”). Periode Concession period is 40 years from stage 1
konsesi selama 40 tahun sejak tanggal operasi operation date, while members of the consortium
tahap 1, dimana anggota konsorsium terdiri dari: are:
1. PT CT Corp Infrastruktur Indonesia (“CT”) 1. PT CT Corp Infrastruktur Indonesia (“CT”)
2. ILSS, the Company’s fully owned subsidiary 2. ILSS, the Company’s fully owned
(“ILSS”) subsidiary (“ILSS”)
3. PT U Connectivity Services (“UCS”) 3. PT U Connectivity Services (“UCS”)
4. PT Terminal Petikemas Surabaya (“TPS”) 4. PT Terminal Petikemas Surabaya (“TPS”)
- 196 -
Page 201
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
Konsorsium Patimban bertujuan untuk Patimban Consortium aims to create Patimban
menjadikan Pelabuhan Patimban menjadi Port as a smart port that are modern and efficient
pelabuhan yang modern dan efisien dimana where technology becomes integral part to the
teknologi menjadi bagian yang tidak terpisahkan management of Patimban Project.
dalam pengelolaan Proyek Patimban.
Selanjutnya Para Pihak mendirikan PT Pelabuhan Subsequently the Parties established PT
Patimban Internasional berdasarkan Akta Notaris Pelabuhan Patimban Internasional based on
Dedy Syamri, S.H. No. 1 tanggal 5 Februari 2021 Notarial Deed No. 1 of Dedy Syamri, S.H. dated
dengan komposisi pemegang saham sebagai February 5, 2021 with the shareholders’
berikut: composition as follow:
Persentase
Kepemilikan/ Jumlah Modal
Nama Pemegang Saham/ Jumlah Saham/ Percentage of Disetor/Total
Name of Stockholders Number of Shares Ownership Paid-up Capital
Rp
PT CT Corp Infrastruktur Indonesia (CT) 3.200.000 32,00% 3.200.000.000
PT Indika Logistic & Support Services 2.900.000 29,00% 2.900.000.000
PT U Connectivity Services (UCS) 2.900.000 29,00% 2.900.000.000
PT Terminal Petikemas Surabaya (TPS) 1.000.000 10,00% 1.000.000.000
Jumlah/Total 10.000.000 100,00% 10.000.000.000
Pada tanggal 17 Maret 2021, telah dilakukan On March 17, 2021, an agreement of Kerjasama
penandatanganan perjanjian Kerjasama antara antara Pemerintah dengan Badan Usaha
Pemerintah dengan Badan Usaha (“KPBU”) (“KPBU”) was signed between the Director
antara Direktur Jenderal Perhubungan Laut General of Sea Transportation and PT Pelabuhan
dengan PT Pelabuhan Patimban Internasional Patimban Internasional (PPI), which is a joint
(PPI), yang merupakan konsorsium bersama consortium between IMU, CT, UCS and TPS.
antara IMU, CT, UCS dan TPS
Setelah Perjanjian KPBU ini berlaku efektif, maka After this PPP Agreement becomes effective, PPI
PPI secara resmi menjadi operator yang akan officialy becomes the operator that will manage
mengelola Pelabuhan Patimban dan diharapkan the Patimban Port and is expected to provide
dapat memberi layanan prima serta mampu excellent service and be able to manage the port
mengelola pelabuhan seefisien mungkin sehingga as efficiently as possible so that it can contribute
mampu berkontribusi mengurangi biaya logistik to reducing national logistics costs significantly.
nasional secara signifikan.
Pada tanggal 3 Mei 2021, ILSS menjual 29% On May 3, 2021, ILSS sold its 29% ownership in
kepemilikan sahamnya di PT Pelabuhan Patimban PT Pelabuhan Patimban Internasional to
Internasional kepada PT Interport Patimban PT Interport Patimban Agung in amount of
Agung senilai Rp 2.900.000.000 atau setara Rp 2,900,000,000 or equivalent to US$ 184,349.
dengan US$ 184.349.
dd. Pada tanggal 15 April 2021, PSB dan dd. On April 15, 2021, PSB and PT Exxonmobil
PT Exxonmobil Lubricants Indonesia telah Lubricants Indonesia entered into and agreement
menandatangani kontrak, di mana PSB that PSB provides throughput services with
memberikan jasa throughput dengan masa duration valid until April 14, 2022.
kontrak hingga 14 April 2022.
Pada tanggal 30 Mei 2022, PSB dan Exxonmobil On May 30, 2022, PSB and Exxonmobil Lubricants
Lubricants Indonesia menandatangani Indonesia signed an amendment to the
amandemen Perjanjian untuk memperpanjang Agreement to extend contract period up to
jangka waktu perjanjian hingga 14 April 2023. April 14, 2023.
Pada tanggal 15 April 2023, PSB dan Exxonmobil On April 15, 2023, PSB and Exxonmobil
Lubricants Indonesia menandatangani Lubricants Indonesia signed an amendment to
amandemen Perjanjian untuk memperpanjang the Agreement to extend contract period up to
jangka waktu perjanjian hingga 14 April 2024. April 14, 2024.
- 197 -
Page 202
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
Pada tanggal 04 April 2024, PSB dan Exxonmobil On April 04, 2024, PSB and Exxonmobil
Lubricants Indonesia menandatangani Lubricants Indonesia signed the 3rd Amendment
Amandemen ke-3 Perjanjian untuk to the Agreement to extend contract period up to
memperpanjang jangka waktu perjanjian hingga April 14, 2025.
14 April 2025.
ee. Pada tanggal 3 November 2021, PRI, Chevron ee. On November 3, 2021, PRI, Chevron Makassar
Makassar Ltd., and Chevron Rapak Ltd., Ltd., and Chevron Rapak Ltd., signed an
menandatangani perjanjian jasa penyediaan agreement for the provision of temporary storage
tempat penyimpanan sementara untuk bahan for hazardous waste materials in West Seno
limbah B3 di fasilitas darat Seno Barat. Perjanjian onshore facility. This agreement is valid for
ini berlaku selama 3 tahun dimulai tanggal 3 years starting from November 3, 2021 to
3 November 2021 sampai dengan 2 November November 2, 2024 with the total contract
2024 dengan jumlah nilai kontrak amounted to Rp 4,134,281,286.
Rp 4.134.281.286
ff. PSB menandatangani perjanjian kerjasama ff. PSB signed an agreement with Exxonmobil
dengan Exxonmobil Lubricants Indonesia Lubricants Indonesia regarding the Provision of
mengenai Jasa Penyediaan Transportasi Bahan Fuel Transport Services. This agreement is valid
Bakar. Perjanjian ini berlaku sejak tanggal from February 4, 2022 until February 3, 2024
4 Februari 2022 sampai dengan 3 Februari 2024 with contract value amounted Rp 86,142,600,000.
dengan nilai kontrak Rp 86.142.600.000.
Pada 4 Maret 2023 para Pihak menandatangani On March 4, 2023, the Parties signed the
Amandemen 2 yang memperpanjang periode Amendment 2 to extend period of contract up to
Kontrak menjadi 31 Agustus 2025. August 31, 2025.
gg. Pada tanggal 27 Maret 2023 ILSS dan Kantor gg. On March 27, 2023, ILSS and the Class I
Kesyahbandaran dan Otoritas Pelabuhan kelas I Harbormaster and Port Authority Office of
Balikpapan Direktorat Jenderal Perhubungan Laut Balikpapan, Directorate General of Sea
Kementerian Perhubungan Republik Indonesia Transpartation, Ministry of Transportation of the
menandatangani perjanjian konsesi tentang Republic of Indonesia signed a concession
penyediaan pelayanan Pelabuhan di Balikpapan agreement regarding the provision and/or port
dengan masa konsesi selama 31 tahun sejak services in Balikpapan with a concession period of
tanggal perjanjian ditandatangani. 31 years from the date this agreement was
signed.
Pada tanggal 30 Agustus 2024, perjanjian On August 30, 2024, this concession agreement
konsesi ini telah dilakukan amandemen dengan was amended to change the concession period to
mengubah jangka waktu konsesi menjadi 54 54 years.
tahun.
hh. CTA menandatangani kontrak dengan PT Sea hh. CTA entered into agreements with PT Sea Bridge
Bridge Shipping (SBS), entitas asosiasi, dimana Shipping (SBS), an associate, wherein SBS
SBS memberikan jasa pemuatan batubara dari performs services to load the coal from loading
titik muatan di Tanah Merah Coal Transshipment point at Tanah Merah Coal Transshipment
(TMCT), transportasi batubara ke titik (TMCT), transport the coal to the transshipment
pengapalan di Teluk Adang dan bongkar muat point at Teluk Adang and loading and unloading
batubara dari tongkang ke kapal. Perjanjian ini the coal from barges to the mother vessels. The
berlaku sampai dengan tanggal 31 Maret 2026. agreements are valid until March 31, 2026.
ii. CTA menandatangani kontrak dengan PT Sea ii. CTA entered into agreements with PT Sea Bridge
Bridge Shipping (SBS), entitas asosiasi, dimana Shipping (SBS), an associate, wherein SBS will
SBS akan melakukan jasa penyewaan kapal perform ship charter services for the Charterer’s
untuk kegiatan proyek pengangkutan batubara project activities of coal transportation. The
Penyewa. Perjanjian ini berlaku sampai dengan agreements are valid until March 31, 2026.
tanggal 31 Maret 2026.
- 198 -
Page 203
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
jj. Pada tanggal 1 Januari 2021, CTA dan PT Karunia jj. On January 1, 2021, CTA and PT Karunia Lintas
Lintas Samudra (KLS) melakukan perjanjian jasa Samudera (KLS) entered into an agreement with
angkut batubara dari titik muat di Tanah Merah wherein KLS perform services to load the coal
Coal Transshipment (TMCT) sampai dengan titik from loading point at Tanah Merah Coal
transshipment di Teluk Adang. Perjanjian ini Transshipment (TMCT) and transport the coal to
berlaku sampai dengan tanggal 31 Maret 2024. the transshipment point at Teluk Adang. This
Pada tanggal 7 Maret 2024 perjanjian ini kembali agreement valid until March, 31, 2024. On March
diperpanjang sampai 31 Maret 2025. 7, 2024 this agreement has been extended again
until March 31, 2025.
kk. Pada tanggal 1 April 2023, CTA dan PT Kartika kk. On April 1, 2023, CTA entered into an agreement
Samudra Adijaya (KSA) melakukan perjanjian with PT Kartika Samudra Adijaya (KSA) wherein
jasa angkut batubara dari titik muat di Tanah KSA perform services to load the coal from
Merah Coal Transshipment (TMCT) sampai loading point at Tanah Merah Coal Transhipment
dengan titik transshipment di Teluk Adang. (TMCT) and transport the coal to the
Perjanjian ini telah berakhir pada 31 Desember transshipment point at Teluk Adang. This
2023. Pada 8 Maret 2024. perjanjian ini kembali agreement already ends on December 31, 2023.
diperpanjang sampai 31 Maret 2025. On March 8, 2024 this agreement has been
extended again until March 31, 2025.
ll. Pada tanggal 30 April 2024, IMN dan PT Trimegah ll. On April 30, 2024, IMN and PT Trimegah Bangun
Bangun Persada Tbk menandatangani Perjanjian Persada Tbk signed an Agreement on
Penyedia Jasa Transportasi dan Jasa Pihak Ketiga Transportation Service Providers and Logistics
Logistik di kawasan Ternate, Maluku Utara. Third Party Services in the Ternate area, North
Perjanjian ini berlaku selama dua tahun berlaku Maluku. This agreement is valid for two years,
efektif terhitung sejak tanggal 1 Mei 2024 sampai effective from May 1, 2024 to April 30, 2026.
dengan 30 April 2026.
mm. Pada tanggal 27 Maret 2024, IMN melakukan mm. On March 27, 2024, IMN entered into a lease
perjanjian sewa Gudang dan Lahan seluas 700 agreement for a 700 m2 Warehouse and Land in
m2 di Kawasan Ternate, Maluku dari CV Alif the Ternate Area, Maluku from CV Alif Bangun
Bangun Mandiri. Perjanjian ini berlaku selama Mandiri. This agreement is valid for two years
dua tahun terhitung sejak 01 Mei 2024 sampai starting from May 1, 2024 to April 30, 2026 with
dengan 30 April 2026 dengan harga sewa sebesar a rental price of Rp 500,000,000.
Rp 500.000.000.
nn. Pada tanggal 11 Febuari 2022, PSB melakukan nn. On February 11, 2022, PSB entered into a ship
perjanjian sewa menyewa Kapal dengan PT lease agreement with PT Pelayaran Kalimantan
Pelayaran Kalimantan Prima Transport yaitu Prima Transport, namely TB. Arwana 88 & OB.
kapal TB. Arwana 88 & OB. SSS 23316, selama SSS 23316, for two years this agreement is
dua tahun perjanjian ini efektif berlaku pada effective from February 16, 2022 to February 15,
tanggal 16 Febuari 2022 sampai dengan 15 2024.
Febuari 2024.
Pada tanggal 25 Agustus 2023, perjanjian ini On August 25, 2023, this agreement has
telah mengalami amandemen yakni undergone amendments, namely an extension of
perpanjangan waktu sewa sampai dengan 1 the lease period until September 1, 2025 and
September 2025 dan perubahan harga sewa. changes in rental prices.
oo. Pada tanggal 20 September 2023, KGTE dan oo. On September 20, 2023, KGTE and PT DBS
PT DBS Indonesia menandatangani perjanjian Indonesia signed banking facility agreement
fasilitas perbankan No. 224/STC-DBS/IX/1- No. 224/STC-DBS/IX/1-2/2023 with a loan value
2/2023 dengan nilai pinjaman yang diberikan of US$ 50,000,000 with an interest rate of 1.30%
sebesar US$ 50.000.000 dengan tingkat suku plus three months SOFR until March 2027. This
Bunga sebesar 1,30% ditambah dengan SOFR loan is used to pay off credit with PT Bank Mandiri
tiga bulan hingga Maret 2027. Pinjaman ini (Persero) Tbk, PT Bank Negara Indonesia
digunakan untuk melunasi kredit dengan PT Bank (Persero) Tbk and PT Bank UOB Indonesia. On
Mandiri (Persero) Tbk, PT Bank Negara Indonesia September 25, 2023 KGTE has withdrawn all
(Persero) Tbk dan PT Bank UOB Indonesia. Pada banking facilities.
tanggal 25 September 2023 KGTE telah
mencairkan seluruh fasilitas perbankan tersebut.
- 199 -
Page 204
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
Perjanjian fasilitas kredit mencakup persyaratan The credit facility agreement contains certain
tertentu untuk mempertahankan rasio keuangan. covenants to maintain financial ratios. As of
Pada tanggal 30 September 2024, KGTE telah September 30, 2024, KGTE has complied with
memenuhi persyaratan tersebut. these covenants.
pp. Pada tanggal 30 April 2020, KJA menandatangani pp. On April 30, 2020, KJA signed a credit facility
perjanjian fasilitas kredit dengan PT Bank UOB agreement with PT Bank UOB Indonesia (“UOB”)
Indonesia (“UOB”) dimana KJA memperoleh wherein KJA is provided with the following
fasilitas sebagai berikut: facilities:
• Fasilitas Perdagangan Multi Opsi dengan • Multi Option Trade Facility with maximum
fasilitas maksimal sebesar US$ 30.000.000, facility of US$ 30,000,000, covering:
mencakup:
1. Fasilitas Uncommitted Early Payment 1. Uncommitted Early Payment Discount
Discount (“EPD”), sebelumnya (“EPD”), previously named Bill Export
dinamakan Bill Export Purchase Buyer Purchase Buyer (“BEP”) Facility.
("BEP").
EPD dalam mata uang Rupiah dikenakan Rupiah denominated EPD bears interest
bunga JIBOR tiga bulan yang berlaku per annum at JIBOR three months plus
ditambah 1,75% per tahun, sedangkan 1.75% per annum, while US$
EPD dalam mata uang US Dolar denominated EPD bears SOFR plus 1.5%
dikenakan bunga SOFR ditambah 1,5% per annum. Maximum tenor for EPD
per tahun. Jangka waktu maksimum facility is 3 months from drawdown.
fasilitas EPD adalah 3 bulan sejak
penarikan.
2. Fasilitas Uncommitted Bank Guarantee 2. Uncommitted Bank Guarantee (“BG”)
(“BG”) untuk penerbitan performance Facility for issuance of performance bond
bond dan bid bond. and bid bond.
Penerbitan BG akan dikenakan biaya Issuance of BG will be charged fee of
sebesar 0,5% per tahun dengan jumlah 0.5% per annum, with minimum amount
minimum US$ 50. of US$ 50.
3. Fasilitas Uncommitted Standby Letter of 3. Uncommited Standby Letter of Credit
Credit (“SBLC”) untuk penerbitan Bid (“SBLC”) facility for issuance of Bid Bond
Bond dan Performance Bond. and Performance Bond.
Penerbitan SLBC akan dikenakan biaya Issuance of SLBC will be charged fee of
sebesar 0,5% per tahun dengan jumlah 0.5% per annum, with minimum amount
minimum US$ 50. of US$ 50.
• Fasilitas Valas tanpa ikatan dengan fasilitas • Uncommitted FX Facility with maximum
maksimal sebesar US$ 20.000.000. facility of US$ 20,000,000.
Batas maksimum kedua fasilitas di atas Maximum limit of the above two facilities is
adalah US$ 50.000.000. Fasilitas kredit ini US$ 50,000,000. The facility is valid for one
berlaku selama satu tahun dan akan year and will be automatically extended for
diperpanjang secara otomatis untuk periode successive 1 year period unless the bank
satu tahun berikutnya kecuali jika bank terminates by giving KJA at least 1 month
mengakhiri dengan pemberitahuan kepada advance notice.
KJA minimal 1 bulan sebelumnya.
Pada tanggal 30 September 2024, KJA telah As of September 30, 2024, KJA has used this
menggunakan fasilitas BG sehubungan BG facility in relation to sales contract
dengan contract penjualan sebesar Rp amounting to Rp 37,256,750,000 or
37.256.750.000 atau setara dengan equivalent to US$ 2,460,166 and US$ 604,230
US$ 2.460.166 dan US$ 604.230 (31 (December 31, 2023: Rp 38,143,250,000 or
Desember 2023: Rp 38.143.250.000 atau equivalent to US$ 2,470,578).
setara dengan US$ 2.470.578).
- 200 -
Page 205
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
• Fasilitas Export Invoice Financing Devisa Hasil • Export Invoice Financing Foreign Exchange
Ekspor dari Barang Ekspor Sumber Daya Alam Proceeds from Exports of Natural Resources
(“EIF-DHE SDA”) dengan fasilitas maksimal (“EIF-DHE SDA”) with maximum facility of Rp
sebesar Rp 1.100.000.000.000. 1,100,000,000,000.
Jumlah penarikan fasilitas EIF-DHE SDA EIF-DHE SDA facility drawdown which uses FX
dengan menggunakan Fasilitas Valas sebesar Facility amounting 100% from cash balance
100% dari jumlah saldo tunai yang ditahan that is restricted in Current Account or Time
dalam Rekening Khusus atau Deposito Deposit DHE. KJA provides collateral in the
Berjangka DHE. KJA memberikan jaminan form of bank account/time deposit pledge.
berupa gadai rekening/deposito.
Jumlah penarikan EIF-DHE SDA tanpa EIF-DHE SDA facility drawdown which doesn’t
menggunakan Fasilitas Valas sebesar 90% use FX Facility amounting 90% from cash
dari jumlah saldo tunai yang ditahan dalam balance that is restricted in Current Account or
Rekening Khusus atau Deposito Berjangka Time Deposit DHE. KJA provides collateral in
DHE. KJA memberikan jaminan berupa gadai the form of bank account/time deposit pledge
rekening/deposito yang menjamin seluruh which guarantee all facilities with maximum
fasilitas dengan rasio Loan to Value (“LTV”) 90% Loan to Value ratio (“LTV”).
maksimal 90%.
EIF-DHE SDA dikenakan bunga JIBOR EIF-DHE SDA bears interest per annum at
ditambah 0,5% per tahun. JIBOR plus 0.5%.
qq. Pada tanggal 11 Mei 2020, KJA menandatangani qq. On May 11, 2020, KJA signed Master Credit
Master Credit Facility Agreement dengan Citibank, Facility Agreement with Citibank, N.A. wherein
N.A. dimana KJA mendapatkan fasilitas kredit KJA is provided with revolving credit facilities
revolving yang mencakup fasilitas modal kerja, covering working capital facility, overdraft facility
fasilitas overdraft, dan fasilitas kredit usaha and trade loan facility up to an initial amount of
dengan jumlah awal hingga US$ 20.000.000. US$ 20,000,000. The facility is valid for one year
Fasilitas ini berlaku untuk satu tahun dan akan and will be automatically extended for successive
diperpanjang secara otomatis untuk periode satu 1 year period unless the bank terminates by
tahun berikutnya kecuali jika bank mengakhiri giving KJA at least 30 calendar days advance
dengan pemberitahuan kepada KJA minimal notice.
30 hari sebelumnya.
Pinjaman ini berjangka waktu maksimal 3 bulan The loan has a 3-month maximum tenor and
dan dikenakan bunga LIBOR ditambah 1,75%, bears interest of LIBOR plus 1.75%, payable on
yang dibayarkan setiap triwulanan. a quarterly basis.
Pada tanggal 30 September 2024, KJA On September 30, 2024, KJA has used this credit
menggunakan fasilitas kredit sebesar facility amounting US$ 20,000,000 with maturity
US$ 20.000.000 dengan tanggal jatuh tempo date on December 27, 2024 with interest of
pada 27 Desember 2024 dengan suku bunga 5.07%.
5,07%.
rr. Pada tanggal 30 September 2024, KJA memiliki rr. As of September 30, 2024, KJA has outstanding
pesanan pembelian yang sebagian besar terdiri purchase orders which is mainly for purchase
dari pembelian suku cadang, dengan nilai sebesar spareparts, amounting to
US$ 10.065.973 (31 December 2023: US$ 10,065,973 (December 31, 2023:
US$ 16.677.730). US$ 16,677,730).
ss. KJA juga memiliki jaminan bank sehubungan ss. KJA also has a bank guarantee in relation to sales
dengan kontrak penjualan dengan PT Bank UOB contracts with PT Bank UOB Indonesia as of
Indonesia pada tanggal 30 September 2024 September 30, 2024 amounting to
sebesar US$ 2.804.230 (31 Desember 2023: US$ 2,804,230 (December 31, 2023:
US$ 2.600.000) dan dengan PT Bank Mandiri US$ 2,600,000) and with PT Bank Mandiri
(Persero) Tbk sebesar US$ 3.943.000 pada (Persero) Tbk amounting to US$ 3,943,000 as of
tanggal 30 September 2024 (31 Desember 2023: September 30, 2024 (December 31, 2023:
US$ 3.943.000). US$ 3,943,000).
- 201 -
Page 206
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
tt. Kewajiban kehutanan tt. Forestry obligations
Berdasarkan PPKH OP yang diterbitkan Based on PPKH OP as issued on February 20,
pada tanggal 20 Februari 2023, 2023, No. SK.149/Menlhk/Setjen/PLA.0/2/2023,
No. SK.149/Menlhk/Setjen/PLA.0/2/2023, KJA KJA has obligation to pay State’s Non- Tax
memiliki kewajiban untuk membayar Penerimaan Revenue from Utilization of Forest Area (“PNBP-
Negara Bukan Pajak Penggunaan Kawasan Hutan PKH”) each year in accordance with prevailing
(“PNBP-PKH”) setiap tahun sesuai dengan laws and regulation.
ketentuan peraturan perundang undangan.
Pada 30 September 2024, KJA telah membayar On September 30, 2024, KJA has paid the
kewajiban untuk PNBP-PKH tahun 2024 sebesar obligation of PNBP-PKH for the year 2023
Rp 94.980.665.500 atau setara dengan amounting to Rp 94,980,665,500 or equivalent to
US$ 6.087.334 (31 Desember 2023: US$ 6,087,334 (December 31, 2023: Rp
Rp 70.031.468.500 atau setara dengan 70,031,468,500 or equivalent to US$ 4,681,561).
US$ 4.681.561).
KJA telah memenuhi ketentuan dari peraturan KJA has complied with the requirements of this
yang dijelaskan di atas. regulation.
uu. Kewajiban Provisi Sumber Daya Hutan (“PSDH”) uu. Provision of Forest Resources (“PSDH”) and
dan Dana Reboisasi (“DR”) Reforestation Fund (“DR”) obligations
Berdasarkan Peraturan Pemerintah No. 23 Tahun Based on Government Regulation No 23 of 2021
2021 Tentang Penyelenggaraan Kehutanan dan concerning Forestry Management and Minister of
Peraturan Menteri Kehutanan No. 8 Tahun 2021 Forestry Regulation No. 8 of 2021 concerning
tentang Tata Hutan dan Penyusunan Rencana Forest Administration and Preparation of Forest
Pengelolaan Hutan Serta Pemanfaatan Hutan di Management Plans and Forest Utilization in
Hutan Lindung dan Hutan Produksi, diatur bahwa Protected Forests and Production, it is regulated
atas kegiatan di area kawasan kehutanan that activities in forest area shall be subject to a
dikenakan pungutan sebagai pengganti nilai levy for substitute benefit value of forest
pemanfaatan hutan dan dana untuk reboisasi dan utilization and DR and forest rehabilitation, also
rehabilitasi hutan serta kegiatan pendukungnya supporting documents according to the applicable
sesuai tarif yang berlaku dalam peraturan tariffs in the regulation of the Minister of Forestry.
Menteri Kehutanan.
vv. Kewajiban rehabilitasi Daerah Aliran Sungai vv. Watershed/ Daerah Aliran Sungai (“DAS”)
(“DAS”) rehabilitation obligation
Pada tanggal 5 November 2019, KJA menerima On November 5, 2019, KJA received the Minister
surat keputusan Menteri Lingkungan Hidup of Environment and Forestry’s decree
dan Kehutanan No. SK.9320/Menlhk- No. SK.9320/Menlhk PDASHL/KTA/DAS.1/11/2019
PDASHL/KTA/DAS.1/11/2019 tentang penetapan concerning the determination of planting location
lokasi penanaman dalam rangka rehabilitasi for the rehabilitation of watersheds.
daerah aliran sungai.
Berdasarkan SK.9320/Menlhk-PDASHL/KTA/DAS.1/11/2019, Based on SK.9320/Menlhk-PDASHL/KTA/DAS.1/11/2019,
ditetapkan lokasi penanaman dalam rangka a planting location for the rehabilitation of the
rehabilitasi Daerah Aliran Sungai seluas 13.260 watershed area of 13,260 (thirteen thousand two
(tiga belas ribu dua ratus enam puluh) hektare hundred and sixty) hectares was established
atas nama PT Kideco Jaya Agung yang terletak under the name of
pada Kawasan Taman Nasional Kutai dalam DAS PT Kideco Jaya Agung which is located in the Park
Sangatta dan DAS Mahakam di Kecamatan Area National Kutai in the Sangatta watershed
Sangatta Selatan, Kecamatan Muara Kaman dan and Mahakam watershed in South Sangatta
Kecamatan Rantau Pulung, Kabupaten Kutai District, Muara Kaman District and Rantau Pulung
Timur dan Kabupaten Kutai Kartanegara, Provinsi District, East Kutai Regency and Kutai
Kalimantan Timur. Kartanegara Regency, East Kalimantan Province.
Pada tanggal 21 Mei 2021, KJA menerima Surat On May 21, 2021, KJA received the Decree of the
Keputusan Menteri Lingkungan Hidup dan Minister of Environment and Forestry No. SK.
Kehutanan No. SK. 3924/Menlhk-PDASHL/KTA/ 3924/Menlhk-PDASHL/KTA/ DAS.1/5/2021
DAS.1/5/2021 tentang Perubahan atas concerning Amendments to the Decree of the
Keputusan Menteri Lingkungan Hidup dan Minister of Environment and Forestry
Kehutanan No. SK.9320/Menlhk- No. SK.9320/Menlhk-PDASHL/KTA/DAS.1/11/2019
PDASHL/KTA/DAS.1/11/2019 tanggal dated November 5, 2019 stipulating the location
5 November 2019 tentang Penetapan Lokasi of planting for watershed rehabilitation on behalf
Penanaman Rehabilitasi Daerah Aliran Sungai of PT Kideco Jaya Agung. SK decision
- 202 -
Page 207
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
atas nama PT Kideco Jaya Agung. Keputusan SK. 3924/Menlhk- PDASHL/KTA/DAS.1/5/2021
3924/Menlhk-PDASHL/KTA/DAS.1/5/2021 mengubah amending of SK.9320/Menlhk-
SK.9320/Menlhk-PDASHL/KTA/DAS.1/11/2019, PDASHL/KTA/DAS.1/11/2019, stipulating the
menetapkan lokasi penanaman rehabilitasi DAS location of planting for watershed rehabilitation
seluas 13.438 (tiga belas ribu empat ratus tiga covering an area of 13,438 (thirteen thousand
puluh delapan) hektare. four hundred thirty eight) hectare.
Pada tanggal 10 Maret 2022, KJA menerima surat On March 10, 2022, KJA received the Decree of
Keputusan Menteri Lingkungan Hidup dan the Minister of Environment and Forestry No. SK.
Kehutanan No. SK. 1632/Menlhk- 1632/Menlhk- PDASRH/KTA/DAS.1/3/2022
PDASRH/KTA/DAS.1/3/2022 tentang Perubahan concerning Second Amendments to the Decree of
Kedua atas Keputusan Menteri Lingkungan Hidup the Minister of Environment and Forestry No.
dan Kehutanan No. SK.9320/Menlhk- SK.9320/Menlhk-PDASHL/KTA/DAS.1/11/2019
PDASHL/KTA/DAS.1/11/2019 tentang Penetapan stipulating the location of planting for watershed
Lokasi Penanaman Dalam Rangka Rehabilitasi rehabilitation on behalf of PT Kideco Jaya Agung.
Daerah Aliran Sungai atas nama PT Kideco Jaya This Decree revokes SK decision of the Minister
Agung. Keputusan ini mencabut surat Keputusan of Environment and Forestry No. 3924/Menlhk-
Menteri Lingkungan Hidup dan Kehutanan PDASHL/KTA/DAS.1/5/2021 and its attached
No. SK. 3924/Menlhk-PDASHL/KTA/DAS.1/5/2021 map.
beserta peta lampirannya.
Sampai dengan tanggal 30 September 2024, KJA As of September 30, 2024, KJA has started land
telah memulai kegiatan penyiapan lahan, preparation, hatchery and planting activities and
pembenihan dan penanaman serta telah has made provisions for the river flow
mencadangkan penyisihan rehabilitasi aliran rehabilitation of US$ 5,400,000 (2023:
sungai sebesar US$ 5.400.000 (2023: US$ US$ 10,846,013).
10.846.013).
ww. Kontrak jasa penambangan ww. Mining service contract
Dalam menjalankan kegiatan penambangan, KJA In running the mining operation, KJA has entered
telah melakukan beberapa perjanjian dengan into a number of agreements with contractors to
kontraktor untuk menyediakan jasa provide mining services to KJA such as
penambangan kepada KJA seperti pengupasan overburden removal, coal loading, coal hauling
tanah, pemuatan batubara, pemindahan and coal transport. Under the agreements, KJA is
batubara dan pengangkutan batubara. required to pay contractors a service fee and
Berdasarkan perjanjian tersebut, KJA diwajibkan contractors will provide all plant, equipment,
untuk membayar kontraktor dengan biaya jasa machinery, appliances and other items necessary
dan kontraktor akan menyediakan peralatan, for performing the mining services.
perlengkapan, mesin dan alat-alat lainnya yang
dibutuhkan dalam menjalankan jasa
penambangan.
Selain itu, KJA juga melakukan perjanjian In addition to that, KJA has also entered into
pengapalan dan penanganan batubara dengan barging and coal handling agreements with
kontraktor untuk menyediakan derek terapung contractors in relation to floating cranes and coal
dan jasa pengapalan batubara dari terminal transshipment services from KJA’s coal terminal
batubara KJA ke kapal pelanggan. Masa berlaku to customer vessels. The mining equipment and
perjanjian peralatan tambang dan jasa coal handling service contracts extend for periods
transportasi batubara tersebut bervariasi antara of between 1-9 years.
1-9 tahun.
- 203 -
Page 208
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
xx. Undang-Undang Pertambangan No. 4/2009 xx. Mining Law No. 4/2009
Pada tanggal 12 Januari 2019, Pemerintah On January 12, 2019, the Government ratified
mengesahkan dan mengundangkan Undang- and promulgated Law No. 4 Year 2009 concerning
Undang No. 4 Tahun 2009 tentang Pertambangan Mineral and Coal Mining. The Coal Contract of
Mineral dan Batubara. Sistem Perjanjian Karya Work (“CCoW”) system under which KJA operates
Pengusahaan Pertambangan Batubara (“PKP2B”) will no longer be available to investors. While
seperti dimiliki KJA tidak akan lagi tersedia untuk Mining Law No. 4/2009 indicates that existing
para investor. Walaupun Undang- Undang CoWs, such as KJA’s CCoW, will be honoured, the
Pertambangan No. 4/2009 ini mengindikasikan transition provisions stated in Mining Law No.
bahwa ketentuan yang ada pada PKP2B yang 4/2009 are unclear and will require clarification
masih berlaku, seperti PKP2B yang dimiliki oleh in Government Regulations these include:
KJA, akan dihormati, ketentuan transisi dalam
Undang-Undang Pertambangan No. 4/2009 ini
tidak jelas, dan diperlukan klarifikasi lebih lanjut
melalui Peraturan Pemerintah antara lain:
− Peraturan peralihan PKP2B. Undang-Undang − The CCoW transition provisions. Mining Law
Pertambangan No. 4/2009 menyatakan No. 4/2009 notes that existing CCoWs will be
bahwa PKP2B yang ada pada saat ini akan valid until their expiration. However, it also
tetap berlaku hingga akhir masa berlakunya. states that existing CCoWs within one year
Namun, Undang-Undang Pertambangan No. must be amended to conform with the
4/2009 ini juga menyatakan bahwa PKP2B provisions of Mining Law No. 4/2009 (other
dalam jangka waktu satu tahun harus than terms related to State Revenue – which
disesuaikan dengan ketentuan-ketentuan is not defined, but presumably includes
yang ada pada Undang-Undang ini (kecuali royalties and taxes); and
ketentuan mengenai Penerimaan Negara –
yang mana tidak didefinisikan, tetapi
kemungkinan mencakup royalti dan pajak);
dan
− Persyaratan kepada para pemegang PKP2B − The requirement for CCoW holders who have
yang telah memulai aktivitasnya untuk, already commenced some form of activity to,
dalam waktu satu tahun dari pengumuman within one year of enactment of Mining Law
Undang-Undang Pertambangan No. 4/2009, No. 4/2009, submit a mining activity plan for
menyampaikan rencana aktivitas the entire contract area.
penambangannya di seluruh wilayah izin
usaha pertambangan.
Terkait dengan kewajiban divestasi pemegang Related to the divestment obligation of foreign
saham pengendali asing, pada tanggal controlling shareholders, on December 6, 2017
6 Desember 2017 Samtan Co. Ltd. yang Samtan Co. Ltd. that previously hold 49% of
sebelumnya memiliki 49% kepemilikan saham di equity shares in KJA has divested 40% of the
KJA telah mendivestasikan 40% saham KJA KJA’s shares to PT Indika Energy Tbk, a domestic
kepada PT Indika Energy Tbk yang merupakan company. After such a divestment,
perusahaan dalam negeri. Setelah divestasi PT Indika Energy Tbk is the controlling
tersebut, PT Indika Energy Tbk merupakan shareholder of KJA.
pemegang saham pengendali.
KJA terus memonitor perkembangan peraturan KJA is closely monitoring the progress of the
terlaksana Undang-Undang Pertambangan implementing regulations for Mining Law
No. 4/2009 tersebut secara ketat dan akan No. 4/2009 and will consider the impact on its
mempertimbangkan dampak terhadap operasi operations, if any, as these regulations are
KJA, jika ada, pada saat peraturan-peraturan issued.
pelaksana ini diterbitkan.
Pada tanggal 14 November 2017, KJA dan On November 14, 2017, KJA and the Government
Pemerintah Republik Indonesia yang diwakili oleh of the Republic of Indonesia represented by
MESDM telah menandatangani amendemen MoEMR has signed the second amendment of the
kedua PKP2B. CCoW.
Manajemen yakin bahwa KJA telah patuh Management believes that KJA has complied with
terhadap ketentuan peraturan-peraturan yang the requirements of the regulations mentioned
disebutkan di atas. above.
- 204 -
Page 209
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
yy. Undang-undang Pertambangan No.3/2020 yy. Mining Law No. 3/2020
Pada tanggal 10 Juni 2020, Pemerintah On June 10, 2020, the Government issued Mining
mengeluarkan Undang–undang Pertambangan Law No. 3/2020 as an amendment to Law No.
No. 3/2020 sebagai perubahan atas Undang- 4/2009 concerning Mineral and Coal Mining.
undang No. 4/2009 tentang Pertambangan CCoWs are guaranteed an extension to IUPK as a
Mineral dan Batubara. PKP2B diberikan jaminan Continuation of Contract/ Agreement Operations
perpanjangan menjadi IUPK sebagai Kelanjutan after fulfilling the requirements with the following
Operasi Kontrak/ Perjanjian setelah memenuhi provisions:
persyaratan dengan ketentuan:
a. PKP2B yang belum memperoleh a. CCoW that have not received an extension
perpanjangan dijamin mendapatkan 2 (dua) are guaranteed to get 2 (two) extensions in
kali perpanjangan dalam bentuk IUPK the form of IUPK as a Continuation of
sebagai Kelanjutan Kontrak/ Perjanjian Contract/Agreement to Operate, each for a
untuk beroperasi masing-masing untuk maximum period of 10 (ten) years as a
jangka waktu paling lama 10 (sepuluh) tahun continuation of operations after the end of
sebagai kelanjutan operasi setelah PKP2B the CCoW by considering efforts to increase
dengan mempertimbangkan upaya revenue of the country.
peningkatan penerimaan negara.
b. IUPK yang telah memperoleh perpanjangan b. IUPK that have obtained the first extension
pertama dijamin untuk diberikan are guaranteed to be given a second
perpanjangan kedua dalam bentuk IUPK extension in the form of IUPK as a
sebagai Kelanjutan Operasi Kontrak/Perjanjian Continuation of Contract/Agreement to
untuk jangka waktu paling lama 10 (sepuluh) Operate for a maximum period of 10 (ten)
tahun sebagai kelanjutan operasi dengan years as a continuation of operations with
mempertimbangkan upaya peningkatan taking into account efforts to increase
penerimaan negara. income state.
zz. Peraturan Pemerintah No. 96/2021 eee.zz. Government Regulation No. 96/2021
fff.
Pada tanggal 9 September 2021, Pemerintah ggg. On September 9, 2021, the Government
menetapkan dan mengundangkan Peraturan stipulated and promulgated Government
Pemerintah No. 96 Tahun 2021 tentang Regulation No. 96 Year 2021 concerning
Pelaksanaan Kegiatan Usaha Pertambangan Implementation of Mineral and Coal Mining
Mineral dan Batubara mengenai IUPK sebagai Business Activities regarding IUPK as
Kelanjutan Operasi Kontrak/Perjanjian sebagai Continuation Contract/ Agreement to Operate as
berikut: follows:
hhh.
i. Untuk memperoleh IUPK sebagai Kelanjutan iii. i. To obtain an IUPK as a Continuation of
Operasi Kontrak/Perjanjian, pemegang Contract/Agreement to Operate, the holder
PKP2B harus mengajukan permohonan of the CCoW must submit an application to
kepada Menteri dalam jangka waktu paling the Minister within a maximum period of 5
lama 5 (lima) tahun atau dalam jangka years or at the latest 1 year before the
waktu paling lambat 1 (satu) tahun sebelum CCoW ends.
PKP2B berakhir.
jjj.
ii. IUPK sebagai kelanjutan dari Kontrak/ kkk. ii. IUPK as a continuation of the
Perjanjian Operasi diberikan dengan Contract/Operation Agreement is granted
ketentuan sesuai sisa jangka waktu PKP2B with the provisions according to the term of
dan perpanjangan pertama selama CCoW and the first extension for 10 (ten)
10 (sepuluh) tahun. years.
iii. Menteri dalam memberikan IUPK sebagai lll. iii. The Minister in granting the IUPK as a
Kelanjutan Operasi Kontrak/Perjanjian Continuation of the Contract/Agreement to
dengan mempertimbangkan keberlanjutan Operate by considering operations,
operasi, optimalisasi potensi cadangan optimizing potential reserves or coal in the
Mineral atau Batubara dalam rangka context of conserving Coal from Areal IUPK
konservasi Batubara dari Wilayah IUPK (“WIUPK”) for the Production Operation
(“WIUPK”) untuk tahap kegiatan Operasi stage, and national interests.
Produksi, dan kepentingan nasional.
mmm.
- 205 -
Page 210
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
iv. Dalam memberikan IUPK sebagai Kelanjutan nnn. iv. In granting the IUPK as a Continuation the
Operasi Kontrak/Perjanjian, Pemerintah Contract/Agreement to Operate, the
mempertimbangkan keberlanjutan operasi Government will consider the operation and
dan optimalisasi potensi cadangan, optimization of potential reserves, and
pemegang PKP2B harus menenuhi syarat PKP2B holders must meet the
administratif, teknis, lingkungan dan administrative, technical, environmental
finansial. and financial requirements.
ooo.
PP No. 96 Tahun 2021 ini mencabut PP No. 23 ppp. GR No. 96 year 2021 revokes GR No. 23 Year
Tahun 2010, PP No. 24 Tahun 2012, PP No. 1 2010, GR No. 24 Year 2012, GR No. 1 Year 2014,
Tahun 2014, PP No. 77 Tahun 2014 dan PP No. 1 GR No. 77 year 2014 and GR No. 1 Year 2017,
Tahun 2017, dan untuk seluruhnya dinyatakan and declared its entirety to be invalid.
tidak berlaku.
qqq.
Pada tanggal 4 Oktober 2021 dan 29 Oktober rrr. On October 4 and October 29, 2021, KJA has
2021, KJA telah menyerahkan dokumen rencana submitted plan for development and/or utilization
pengembangan dan/atau pemanfaatan batubara of domestic coal and Rencana Pengembangan
dalam negeri dan dokumen Rencana Seluruh Wilayah (“RPSW”).
Pengembangan Seluruh Wilayah (“RPSW”).
sss.
Pada 25 Januari 2022, KJA telah menerima surat ttt. On January 25, 2022, KJA received approval from
persetujuan dari MESDM terkait dengan rencana MoEMR related to plan for the Development
pengembangan dan/atau pemanfaatan batubara. and/or Utilization of Coal.
uuu.
Pada tanggal 21 Februari 2022, KJA telah vvv. On February 21, 2022, KJA has submitted its
mengajukan permohonan untuk mendapatkan application for obtaining its first IUPK as a
IUPK sebagai kelanjutan kontrak/perjanjian Continuation of Contract/Agreement Operation.
operasi.
Pada tanggal 16 Desember 2022, MESDM www. On December 16, 2022, the MoEMR granted
memberikan persetujuan IUPK sebagai the IUPK as a Continuation of the Contract/
Kelanjutan Operasi Kontrak/Perjanjian yang Agreement to Operate, which is valid until
berlaku sampai dengan 13 Maret 2033 dan dapat March 13, 2033 and can be extended in
diperpanjang sesuai dengan ketentuan yang accordance with prevailing regulation.
berlaku.
xxx.
Setelah memperoleh IUPK sebagai Kelanjutan yyy. Upon obtaining the IUPK as a Continuation of the
Operasi Kontrak/Perjanjian, ketentuan Contract/Agreement to Operate, the provisions
perpajakan dan/atau Penerimaan Negara Bukan on taxation and/or Non-Tax State Revenues
Pajak (PNBP) akan dilaksanakan oleh KJA sesuai (PNBP) will be implemented by KJA in accordance
dengan ketentuan yang berlaku mulai tanggal with prevailing regulations starting January 1,
1 Januari 2023. 2023.
aaa. Peraturan Menteri ESDM No. 7/2017 zzz.aaa. MoEMR Ministerial Regulation No. 7/2017
aaaa.
Pada tanggal 11 Januari 2017, MESDM On January 11, 2017, MoEMR issued a Ministrial
menerbitkan Peraturan Menteri No. 7/2017 (“PM Regulation No. 7/2017 (“MR No. 7”) on the
No. 7”) Tentang Tata Cara Penetapan Harga Procedures for the Setting of Benchmark Prices
Patokan Penjualan Mineral Logam dan Batubara, for Mineral and Coal Sales, as amended several
yang telah diubah beberapa kali terakhir dengan times by Ministerial Regulation No. 11/2020
Peraturan Menteri No. 11/2020 (“PM No. 11”) dated May 14, 2020 (“MR No. 11”), which
yang berlaku pada tanggal 14 Mei 2020, yang regulates that the sale of coal shall be conducted
mengatur bahwa penjualan batubara harus with reference to the benchmark price issued by
dilakukan dengan mengacu pada harga patokan the Minister.
batubara sebagaimana ditetapkan oleh Menteri.
Pada tanggal 5 Januari 2018, MESDM On January 5, 2018, the MoEMR issued a
mengeluarkan Keputusan Menteri No. 23 Ministerial Decision No. 23 K/30/MEM/2018
K/30/MEM/2018 tentang Penetapan Persentase regarding Determination of Minimum Percentage
Minimal Penjualan Batubara Untuk Kepentingan of Coal Sales for Domestic Affairs Year 2018,
Dalam Negeri Tahun 2018, sebagaimana as revoked by Minister of Energy and Mineral
dicabut oleh Keputusan Menteri ESDM Resources Decree No. 267.K/MB.01/MEM.B/2022
No. 267.K/MB.01/MEM.B/2022 tentang concerning Meeting Domestic Coal Needs and
Pemenuhan Kebutuhan Batubara Dalam Minister of Energy and Mineral Resources Decree
Negeri dan Keputusan Menteri ESDM
- 206 -
Page 211
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
No. 399.K/MB.01/MEM.B/2023 tentang No. 399.K/MB.01/MEM.B/2023 concerning
Perubahan Atas Keputusan Menteri ESDM Amendments to the Decree of the Minister of
No. 267.K/MB.01/MEM.B/2022 tentang Energy and Mineral Resources
Pemenuhan Kebutuhan Batubara Dalam Negeri. No. 267.K/MB.01/MEM.B/2022 concerning
Meeting Domestic Coal Needs.
Pada tanggal 28 Desember 2023, MESDM On December 28, 2023, MoEMR issued Approval
memberikan Persetujuan RKAB Tahun 2024 No. RKAB Year 2024 No. T-
T-480.RKAB/MB.05/DJB.B/2023 mengenai 480.RKAB/MB.05/DJB.B/2023 regarding the
pelaksanaan pemenuhan Domestic Market Domestic Market Obligation (“DMO”)
Obligation (“DMO”) tahun 2024. Kewajiban DMO implementation for 2024. The new DMO
sebesar 25% dari jumlah produksi batubara yang requirement is 25% of total coal produce
disetujui oleh Pemerintah yaitu 7.345.774 MT. approved by Government amounted to 7,345,774
Jumlah produksi batubara yang disetujui MT. Total coal produce approved by government
Pemerintah untuk tahun 2024 adalah 29.383.095 for 2024 period is 29,383,095 MT. For the nine-
MT. Untuk periode sembilan bulan yang berakhir months period ended on September 30, 2024,
pada 30 September 2024, KJA telah menjual KJA has sold 8,572,387 MT of coal to domestic
sebanyak 8.572.387 MT batubara ke pasar market.
domestik.
bbb. Peraturan Menteri No. 25/2018 bbb. Ministerial Regulation No. 25/2018
Pada bulan Mei 2018, MESDM mengeluarkan In May 2018, MoEMR issued Ministerial
Peraturan Menteri No. 25/2018 (“PM No. 25/2018”) Regulation No. 25/2018 (“PM No. 25/2018”)
tentang Pengusahaan Pertambangan Mineral dan concerning Mineral and Coal Mining Concession
Batubara yang telah diubah beberapa kali that has been amended several times with
terakhir dengan Peraturan Menteri No. 17/2020, Ministerial Regulation No. 17/2020, which
yang mengatur bahwa penjualan batubara harus stipulates that coal sales must be carried out with
dilakukan dengan mengacu pada harga patokan reference to the coal benchmark price as
batubara sebagaimana ditetapkan oleh determined by the Government. This regulation
Pemerintah. Peraturan ini mencabut beberapa revokes some regulations including Ministerial
peraturan termasuk Peraturan Menteri Regulation No. 17/2010.
No. 17/2010.
Pada tanggal 21 November 2022, MESDM On November 21, 2022, MoEMR issued Ministerial
mengeluarkan Keputusan MESDM Republik Decree of MoEMR Republic of Indonesia
Indonesia No. 267.K/MB.01/MEM.B/2022 Tahun No. 267.K/MB.01/MEM.B/2022 Year 2022
2022 tentang Pemenuhan Kebutuhan Batubara regarding Fulfillment of Domestic Coal Obligation
Dalam Negeri sebagaimana diubah as amended by Minister of Energy and Mineral
oleh Keputusan Menteri ESDM Resources Decree No. 399.K/MB.01/MEM.B/2023
No. 399.K/MB.01/MEM.B/2023 tentang concerning Amendments to the Decree of the
Perubahan Atas Keputusan Menteri ESDM No. Minister of Energy and Mineral Resources No.
267.K/MB.01/MEM.B/2022 tentang Pemenuhan 267.K/MB.01/MEM.B/2022 concerning Fulfillment
Kebutuhan Batubara Dalam Negeri, yang berlaku of Domestic Coal Needs, which takes effect from
mulai tanggal 17 November 2023. Peraturan ini November 17, 2023. This regulation regulates the
mengatur harga jual batubara untuk penyediaan selling price of coal for the provision of electricity
tenaga listrik untuk kepentingan umum sebesar for the public interest at US$ 70/MT in accordance
US$ 70/MT sesuai dengan spesifikasi dan harga with the specifications and the reference coal
batubara acuan. price.
Manajemen yakin bahwa KJA telah patuh Management believes that KJA has complied with
terhadap ketentuan peraturan-peraturan yang the requirements of the regulations mentioned
disebutkan di atas. above.
ccc. Peraturan Pemerintah No. 15 Tahun 2022 ccc. Government Regulation No. 15/2022
Pada 11 April 2022, Pemerintah Indonesia telah On April 11, 2022, the Government of Indonesia
mengundangkan Peraturan Pemerintah No. 15 has promulgated Government Regulation No. 15
Tahun 2022 tentang Perlakukan Perpajakan of 2022 concerning Tax Treatment and/or Non-
Dan/Atau Penerimaan Negara Bukan Pajak Di Tax State Revenue in the Coal Mining Business
Bidang Usaha Pertambangan Batubara Sector (“GR No. 15”).
(“PP No. 15”).
- 207 -
Page 212
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
Setelah mendapatkan IUPK sebagai kelanjutan After obtaining an IUPK as a continuation
operasi kontrak/perjanjian, maka ketentuan operation of the contract/agreement, the
perpajakan, penerimaan negara bukan pajak, provisions for taxation, non-tax state revenue
dan pendapatan daerah berlaku sesuai dengan and regional income are applied in accordance
ketentuan Pasal 16 PP No. 15. with the provisions of Article 16 GR No. 15.
ddd. Peraturan Pemerintah No. 78/2010 ddd. Government Regulation No. 78/2010
Pada 20 Desember 2010, Pemerintah Indonesia On December 20, 2010, the Government of
mengundangkan Peraturan Pemerintah No. Indonesia legislate Government Regulation No.
78/2010 (“PP No. 78”) tentang reklamasi dan 78/2010 (“GR No. 78”) that deals with
pascatambang. reclamation and post-mining activities.
Pemegang IUP-Eksplorasi, antara lain, harus An IUP-Exploration holder, among other
memuat rencana reklamasi di dalam rencana requirements, must include a reclamation plan in
kerja dan anggaran biaya ekplorasinya dan its exploration work plan and budget and provide
menyediakan jaminan reklamasi berupa deposito a reclamation guarantee in the form of a time
berjangka yang ditempatkan pada bank deposit placed at a state-owned bank.
pemerintah.
Pemegang IUP-Operasi Produksi, antara lain, An IUP-Production Operation holder, among
harus menyiapkan (1) rencana reklamasi lima other requirements, must (1) prepare a five- year
tahunan; (2) rencana pascatambang; reclamation plan; (2) prepare a post- mining
(3) menyediakan jaminan reklamasi yang dapat plan; (3) provide a reclamation guarantee that
berupa rekening bersama atau deposito may be in the form of a joint account or time
berjangka yang ditempatkan pada bank deposit placed at a state-owned bank, a bank
pemerintah, bank garansi, atau cadangan guarantee, or an accounting reserve (if eligible);
akuntansi (bila diizinkan); dan (4) menyediakan and (4) provide a post-mine guarantee in the
jaminan pascatambang berupa deposito form of a time deposit at a state-owned bank.
berjangka yang ditempatkan di bank pemerintah.
Penempatan jaminan reklamasi dan jaminan The requirement to provide reclamation and post-
pascatambang tidak menghilangkan kewajiban mine guarantees does not release the IUP holder
pemegang IUP dari ketentuan untuk from the requirement to perform reclamation and
melaksanakan aktivitas reklamasi dan post-mine activities.
pascatambang.
Pada tahun 2012, KJA menerima surat dari In 2012, KJA received several letters from
Direktorat Jenderal Mineral Batubara dan Panas Directorate General Mineral Coal and Geothermal
bumi (“DJMBP”) yang menyetujui rencana (“DGMCG”) which approved the KJA’s mine
penutupan tambang KJA. Berdasarkan surat dari closure plan. Based on a letter from DGMCG No.
DJMBP No. 558/30/DJB/2012 tanggal 7 Februari 558/30/DJB/2012 dated February 7, 2012, KJA
2012, KJA harus menyediakan jaminan should provide a post-mine guarantee for Roto
pascatambang untuk area Roto dan Samurangau and Samurangau Area starting from 2014 to
mulai dari tahun 2014 sampai 2023. Surat ini 2023. This letter has been amended by
telah diubah melalui Surat Persetujuan Agreement Letter of Postmining Plan Amendment
Perubahan Rencana Pascatambang PT Kideco PT Kideco Jaya Agung No. B-
Jaya Agung No. B-346/MB.07/DJB.T/2022 346/MB.07/DJB.T/2022 dated January 24, 2022.
tanggal 24 Januari 2022. Sampai dengan 30 As of September 30, 2024, KJA has placed a post-
September 2024, KJA telah menempatkan mine guarantee in the form of time deposit
jaminan pascatambang dalam bentuk deposito amounting to US$ 39,547,088 (December 31,
berjangka sebesar US$ 39.547.088 (31 2023: US$ 39,547,088) for Roto and
Desember 2023: US$ 39.547.088) untuk area Samurangau area.
Roto dan Samurangau.
Selain itu, berdasarkan surat No. 3164/30/ In addition, based on letter No. 3164/30/
DJB/2012 tanggal 18 September 2012, KJA harus DJB/2012 dated September 18, 2012, KJA should
menyediakan jaminan pascatambang untuk area provide a post-mine guarantee for the Susubang-
Susubang-Uko mulai dari tahun 2013 sampai Uko Area starting from 2013 to 2016.
2016.
- 208 -
Page 213
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
Pada tanggal 11 September 2019, MESDM On September 11, 2019, MoEMR released letter
mengeluarkan surat No. 1528/37/DJP/2019 No. 1528/37/DJP/2019 related to amendment of
terkait perubahan jaminan pascatambang untuk post-mine guarantee for the Susubang-Uko area
area Susubang-Uko mulai tahun 2019 - 2021. starting from 2019 – 2021. As of September 30,
Sampai dengan tanggal 30 September 2024, KJA 2024, KJA has placed a post-mine guarantee in
telah menempatkan jaminan pascatambang the form of time deposits amounting to
dalam bentuk deposito berjangka sebesar US$ 2,852,805 (31 Desember 2023:
US$ 2.852.805 (31 Desember 2023: US$ 2,852,805) for Susubang-Uko area.
US$ 2.852.805) untuk area Susubang-Uko.
Pada tanggal 3 Mei 2018, MESDM On May 3 2018, MESDM promulgated Minister of
mengundangkan Peraturan Menteri ESDM No. 26 Energy and Mineral Resources Regulation No. 26
Tahun 2018 tentang Pelaksanaan Kaidah of 2018 concerning Implementation of Good
Pertambangan Yang Baik dan Pengawasan Mining Principles and Supervision of Mineral and
Pertambangan Mineral dan Batubara, yang salah Coal Mining, which among other things regulates
satunya mengatur pelaksanaan reklamasi, the implementation of reclamation, consideration
pertimbangan nilai masa depan dari biaya of the future value of post-mining costs and
pascatambang dan penentuan cadangan determination of accounting reserves.
akuntansi.
Sebelum peraturan pelaksanaan No. 26/2018 ini Prior to KJA’s implementation of the regulation
dilaksanakan oleh KJA, cadangan jaminan No. 26/2018, the reclamation guarantee reserve
reklamasi dalam bentuk cadangan akuntansi in the form of accounting reserve has been
telah dicatat pada ekuitas sebesar recorded at equity with a total amount of
US$ 4.519.201. US$ 4,519,201.
Pada tanggal 30 September 2024, KJA telah As of September 30, 2024, KJA has placed a time
menempatkan deposito berjangka terkait dengan deposit in relation to reclamation guarantee
jaminan reklamasi sebesar US$ 14.901.691 (31 amounting to US$ 14,901,691 (December 31,
Desember 2023: US$ 19.457.579). 2023: US$ 19,457,579).
eee. Peraturan Pemerintah No. 36/2023 eee. Government Regulation No. 36/2023
Pada 12 Juli 2023, Pemerintah Indonesia On July 12, 2023, the Government of Indonesia
mengeluarkan peraturan terkait Devisa Hasil released a regulation regarding Devisa Hasil
Ekspor dari kegiatan pengusahaan, pengelolaan Ekspor from utilizing, managing, and processing
dan pengolahan sumber daya alam (DHE SDA) of natural resources (DHE SDA) which effective
yang efektif berlaku pada 1 Agustus 2023. on August 1, 2023. This regulation requires
Peraturan ini mewajibkan eksportir hasil mining exporter to deposit DHE SDA into
pertambangan untuk memasukan DHE SDA ke Indonesia’s financial system through Lembaga
dalam sistem keuangan Indonesia melalui Pembiayaan Ekspor Indonesia or bank.
Lembaga Pembiayaan Ekspor Indonesia atau Placement of DHE SDA is required for exporter
bank. Penempatan DHE SDA wajib untuk with export amount on Pemberitahuan Pabean
eksportir dengan nilai ekspor pada Ekspor (PPE) minimum US$ 250,000 or
Pemberitahuan Pabean Ekspor (PPE) paling equivalent. DHE SDA placement is required at
sedikit US$ 250.000 atau ekuivalennya. DHE SDA least 30% for minimum three months placement
wajib ditempatkan paling sedikit sebesar 30% in Current Account DHE SDA.
dalam jangka waktu paling singkat tiga bulan
dalam Rekening Khusus DHE SDA.
Manajemen yakin bahwa KJA telah patuh Management believes that KJA has complied with
terhadap ketentuan peraturan-peraturan yang the requirements of the regulations mentioned
disebutkan di atas. above.
Pada tanggal 30 September 2024, jumlah DHE As of September 30, 2024, total DHE SDA
SDA yang telah ditempatkan oleh KJA sebesar placement by KJA amounted to US$ 101,820,652
US$ 101.820.652 (31 Desember 2023: (December 31, 2023: US$ 118,470,904) (Note
US$ 118.470.904) (Catatan 6). 6).
fff. Pada tanggal 22 Desember 2023, KJA fff. On December 22, 2023, KJA signed Credit Facility
menandatangani Perjanjian Fasilitas Kredit Agreement Talangan Dana Devisa Hasil Ekspor
Talangan Dana Devisa Hasil Ekspor Sumber Daya Sumber Daya Alam (“DHE SDA”) and Treasury
Alam (“DHE SDA”) dan Treasury Line dengan PT Line with PT Bank Mandiri (persero) Tbk wherein
Bank Mandiri (persero) Tbk di mana KJA KJA is provided with revolving credit facilities
mendapatkan fasilitas kredit revolving yang covering working capital facility related with DHE-
- 209 -
Page 214
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
mencakup fasilitas modal kerja terkait dengan SDA placement obligation with maximum facility
kewajiban penempatan DHE-SDA dengan fasilitas of Rp 2,000,000,000,000. The facility is valid for
maksimal sebesar Rp 2,000,000,000,000. one year.
Fasilitas ini berlaku untuk satu tahun.
Pinjaman ini dikenakan bunga 0,5% per tahun di The loan bears interest at 0.5% per annum above
atas tingkat suku bunga Rekening Khusus Giro the interest rate of Current Escrow Account DHE
Escrow DHE SDA yang menjadi agunan. Pada SDA which becomes collateral. As of September
tanggal 30 September 2024, KJA sudah 30, 2024, KJA has used this credit facility and
menggunakan fasilitas kredit tersebut dan paid it.
melunasinya.
ggg. Pada tanggal 18 April 2022, JBP dan PT Bank DBS ggg. On April 18, 2022, JBP and PT Bank DBS
Indonesia ("DBS") menandatangani perjanjian Indonesia ("DBS") signed new term loan facility
untuk memberikan fasilitas pinjaman untuk to support capital expenditure with combined
mendukung pengeluaran modal kerja dengan credit limit of US$ 27,500,000. The details of
limit gabungan sebesar US$ 27.500.000. Rincian facilities provided are as follows:
fasilitas yang diberikan adalah sebagai berikut:
Fasilitas maksimum/ Suku bunga atau komisi/
Fasilitas/Facility Maximum facility Interest rate or commission Periode/Period
Fasilitas pengeluaran Modal (ATL)/ US$ 22,5 juta/ million 2,5% diatas SOFR per tahun/ 5 tahun / years
Capital expenditure Facility (Amortizing term loan) 2.5% above SOFR per annum
Fasilitas LC/ US$ 5 juta/ million - 1 tahun / year
Letter of Credit Facility
Perjanjian tersebut di atas mencakup beberapa The agreement covering certain covenant which
persyaratan yang harus dipenuhi oleh JBP, antara required JBP to fulfill, among other things:
lain:
• Tidak diperkenankan mengubah komposisi • Not allowed to change the composition of
pemilik saham, menerima pinjaman baru dari shareholders, receive new loan from other
pihak lainnya, mengubah jenis usaha dan parties, change the type of business and legal
bentuk hukum, memindahtangankan aset form, transfer the material asset without
material tanpa persetujuan dari Bank DBS. approval from DBS Bank.
• Menjaga dan mempertahankan setiap • Manage and maintain on semi annually basis:
semester:
i. Net debt to equity minimal 3:1 (Jumlah i. Net debt to equity ratio at the minimum 3:1
hutang dikurangi kas dibagi dengan (Total Debt minus cash divide with equity)
ekuitas) untuk JBP; at JBP level;
ii. Net debt to EBITDA minimal 3,75 x untuk ii. Net debt to EBITDA at the minimum 3.75 x
Indika Energy secara konsolidasi; at Indika Energy’s consolidated level;
iii. Fixed Charge Coverage Ratio minimal 2,50 iii. Fixed Charge Coverage Ration at the
x untuk Indika Energy secara konsolidasi. minimum 2.50 x at Indika Energy’s
consolidated level.
• Tidak diperkenankan mensubordinasikan • Not allowed to subordinate the loan/facility.
pinjaman/fasilitas.
Pada tanggal 30 September 2024, JBP telah As of September 30, 2024, JBP has utilized loan
menggunakan fasilitas dari DBS, dan menarik facility from DBS, and made drawdown of
pinjaman sebesar US$ 15,25 juta (31 Desember US$ 15.25 million (December 31, 2023:
2023: US$ 12,5 juta). US$ 12.5 million).
hhh. Pada tanggal 8 September 2016, NAN dan PT hhh. On September 8, 2016, NAN and PT Bank Central
Bank Central Asia Tbk. ("BCA") menandatangani Asia Tbk. ("BCA") signed credit loan facility with
perjanjian untuk memberikan fasilitas kredit the details of facilities provided are as follows:
dengan rincian fasilitas yang diberikan adalah
sebagai berikut:
- 210 -
Page 215
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
i. Fasilitas kredit lokal (rekening koran) i. Local credit facility (Current account) with a
dengan jumlah pagu kredit tidak melebihi maximum amount of credit not exceeding
US$ 949.991; US$ 949,991;
ii. Fasilitas kredit ekspor dengan jumlah pagu ii. Export credit facility with a maximum
kredit tidak melebihi US$ 3.328.000; amount of credit not exceeding US$
3,328,000;
iii. Fasilitas Installment loan dengan jumlah iii. Installment loan facility with a maximum
pagu kredit tidak melebihi US$ 185.597. credit limit not exceeding US$ 185,597.
Bunga yang harus dibayarkan sebesar: Interest to be paid is:
i. 6,0% per tahun yang dihitung dari utang i. 6.0% per annum calculated from debt
yang timbul dari fasilitas kredit lokal arising from local credit facility (current
(rekening koran); account);
ii. 6,0% per tahun yang dihitung dari jumlah ii. 6.0% per annum calculated from the
fasilitas kredit ekspor yang telah ditarik dan number of export credit facilities that have
belum dibayar kembali; been withdrawn and have not been paid
yet;
iii. 6,0% per tahun yang dihitung dari jumlah iii. 6.0% per annum calculated from the
fasilitas kredit installment loan yang telah amount of the installment loan credit facility
ditarik dan belum dibayar kembali. that has been withdrawn and has not been
paid yet.
Fasilitas kredit dari BCA dijamin dengan jaminan The credit facility from BCA is secured by the
sebagai berikut: following collaterals:
• Tanah dan bangunan pabrik, SHGB Nomor • Land and factory buildings, SHGB number
00183/ dagen atas nama NAN di Jl. Solo- 00183/ dagen on behalf of NAN at Jl. Solo
sragen KM 7, Karanganyar, Jawa Tengah; sragen KM 7, Karanganyar, Central Java;
Perjanjian tersebut di atas mencakup beberapa The agreement covering certain covenant which
persyaratan yang harus dipenuhi oleh NAN, required NAN to fulfill, among other things:
antara lain:
• NAN tidak diperkenankan melakukan • NAN is not permitted to distribute
pembagian dividen; dividends;
• NAN wajib untuk mempertahankan rasio • NAN is required to maintain financial ratio
keuangan sebagai berikut: as follows:
- EBITDA/(interest + installment) - Minimum EBITDA / (interest +
minimum 1,00 kali; installment) 1.00 times;
- Current ratio minimum 1,00 kali; - Current ratio minimum 1.00 times;
- Debt to equity ratio maksimal 1,00 kali - Maximum debt to equity ratio of 1.00
(diluar pinjaman pemegang saham). times (Excluding shareholders loan).
iii. Pada tanggal 2 November 2022, PT Electra iii. On November 2, 2022, PT Electra Mobilitas
Mobilitas Indonesia (“EMI”) menandatangani Indonesia (“EMI”) signed Uncommitted Facility
Surat Fasilitas tanpa ikatan dengan Standard Offering Letter with Standard Chartered Bank
Chartered Bank Indonesia (“SCB”), yang terdiri Indonesia (“SCB”), which consist of the following
dari beberapa fasilitas berikut ini: facilities:
- 211 -
Page 216
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
Fasilitas/ Facility Informasi/ Information Nilai/ Amount
Pembiayaan Faktur Impor/ Import ● Pagu fasilitas/ Facility limit US$ 10.000.000
Invoice Financing ● Komisi/ Commission 2% di atas Cost of Fund Bank/
2% over Bank’s Cost of Fund
● Jangka Waktu/ Tenor 120 hari sejak tanggal pembiayaan/
120 days from financing date
Pinjaman Jangka Pendek/ ● Pagu fasilitas/ Facility limit US$ 7.000.000
Short-term Loans ● Komisi/ Commission 2,25% di atas Cost of Fund Bank/
2.25% over Bank’s Cost of Fund
● Jangka Waktu/ Tenor 30 hari/ 30 days
LC impor dijamin/ Import LCs - Secured ● Pagu fasilitas/ Facility limit US$ 10.000.000
● Biaya penerbitan LC/ LC issuance fee 0,4% per tahun dengan biaya komisi minimum
US$100/ 0.4% per annum, with minimum
fee of US$100
● Biaya akseptasi LC/ LC acceptance fee 1,0% per tahun dengan biaya komisi minimum
US$100/ 1.0% per annum, with minimum
fee of US$100
LC impor tidak dijamin/ Import LCs - ● Pagu fasilitas/ Facility limit US$ 10.000.000
Unsecured ● Biaya penerbitan LC/ LC issuance fee 0,4% per tahun dengan biaya komisi minimum
US$100/ 0.4% per annum, with minimum
fee of US$100
● Biaya akseptasi LC/ LC acceptance fee 1,0% per tahun dengan biaya komisi minimum
US$100/ 1.0% per annum, with minimum
fee of US$100
Pinjaman Impor/ Import Loan ● Pagu fasilitas/ Facility limit US$ 10.000.000
● Komisi/ Commission 2% di atas Cost of Fund Bank/
2% over Bank’s Cost of Fund
● Jangka Waktu/ Tenor 120 hari sejak tanggal pembiayaan/
120 days from financing date
Obligasi dan jaminan/ Bond and guarantees ● Pagu fasilitas/ Facility limit US$ 5.000.000
Jumlah pagu fasilitas gabungan tidak melebihi Total combined limit facility is US$ 10,000,000.
US$ 10.000.000.
Dalam fasilitas ini terdapat beberapa kondisi dan The facility contains certain terms and conditions
persyaratan yang harus dipenuhi oleh EMI, that require EMI to fulfill, as further detailed in
sebagaimana diperjanjikan dalam surat fasilitas. the facility letter.
Sampai dengan 30 September 2024, EMI telah As of September 30, 2024, EMI has utilized
menggunakan fasilitas Pembiayaan Faktur Impor nil from Import Invoice Financing facility
sebesar nihil (31 Desember 2023: (December 31, 2023: 1,042,043) and
US$ 1.042.043) dan fasilitas Pinjaman Jangka US$ 2,441,715 from Short-term Loan facility
Pendek sebesar US$ 2.441.715 (31 Desember (December 31, 2023: US$ 3,104,787).
2023: US$ 3.104.787).
jjj. Pada tanggal 22 Februari 2023, PT Energi jjj. On 22 February 2023, PT Energi Makmur Buana,
Makmur Buana, entitas anak (“EMB”) dan a subsidiary ("EMB") and Daeyong Chaevi Co,
Daeyong Chaevi Co, Ltd. (“Chaevi”) telah Ltd. ("Chaevi") have entered into a Distribution
menandatangani Perjanjian Distribusi dimana Agreement whereby EMB acts as the Distributor
EMB berperan sebagai Distributor untuk charger for charger stations ("Chaevi Charger Stations")
station (“Chaevi Charger Station”) dan berhak and is entitled to import and distribute Chaevi
untuk mengimpor dan mendistribusikan Chaevi Charger in the Territory as referred to in the
Charger di Wilayah sebagaimana dimaksud dalam Distribution Agreement. The Distribution
Perjanjian Distribusi. Perjanjian Distribusi akan Agreement will be valid for 2 (two) years or until
berlaku selama 2 (dua) tahun atau sampai 22 February 2025.
tanggal 22 Februari 2025.
kkk. Pada tanggal 15 April 2023, PT Energi Makmur kkk. On April 15, 2023, PT Energi Makmur Buana
Buana (“EMB”), entitas anak dan Edison Motors (“EMB”), a subsidiary and Edison Motors Co. Ltd.
Co. Ltd. (“Edison”) telah menandatangani (“Edison”) have signed and entered into a
Perjanjian Distribusi dimana EMB berperan Distribution Agreement wherein EMB acts as
sebagai Distributor untuk bus listrik Edison Distributor for electric bus of Edison (“Edison
(“Edison Bus”) dan berhak untuk mengimpor dan Bus”) and is entitled to import and distribute the
mendistribusikan Edison Bus di Wilayah Edison Bus in the Territory as stipulated in the
sebagaimana dimaksud dalam Perjanjian Distribution Agreement. The Distribution
Distribusi. Perjanjian Distribusi akan berlaku Agreement is effective for five years.
selama lima tahun.
- 212 -
Page 217
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
Sesuai dengan Perjanjian Distribusi, kepemilikan In accordance with the Distribution Agreement, it
Edison Bus akan beralih ke EMB selaku Distributor is agreed that title of Edison Bus shall pass to
setelah adanya pembayaran penuh dari harga EMB as Distributor upon receipt of full payment
yang diberikan oleh Edison. of the price quoted by Edison.
lll. Pada tanggal 1 Oktober 2023, EMB dan Hyundai lll. On October 1, 2023, EMB and Hyundai Motor
Motor Company (“HMC”) telah menandatangani Company (“HMC”) have signed and entered into
Perjanjian Distribusi dimana EMB berperan a Distribution Agreement where EMB act as
sebagai Distributor untuk bus listrik Hyundai Distributor for electric bus of Hyundai (“Hyundai
(“Hyundai Bus”) dan berhak untuk mengimpor Bus”) and entitled to import and distribute the
dan mendistribusikan Hyundai Bus di Wilayah Hyundai Bus in the Territory as stipulated in the
sebagaimana dimaksud dalam Perjanjian Distribution Agreement. The Distribution
Distribusi. Perjanjian Distribusi akan berlaku Agreement is effective until December 31, 2025.
sampai dengan 31 Desember 2025.
mmm. Pada tanggal 8 Januari 2024, PT Energi Makmur mmm. On 8 January 2024, PT Energi Makmur Buana, a
Buana, entitas anak (“EMB”) dan PT Abacus subsidiary ("EMB") and PT Abacus Kencana
Kencana Industries. (“Abacus”) telah Industries. ("Abacus") have entered into a
menandatangani Perjanjian Distribusi dimana Distribution Agreement whereby EMB acts as the
EMB berperan sebagai Distributor untuk Abacus Distributor for charger stations ("Abacus Charger
station (“Abacus Charger Station”) dan berhak Stations") and is entitled to distribute Abacus
untuk mendistribusikan Abacus Charger Station Charger Stations in the Territory as referred to in
di Wilayah sebagaimana dimaksud dalam the Distribution Agreement. The Distribution
Perjanjian Distribusi. Perjanjian Distribusi akan Agreement will be valid for 3 (three) years or
berlaku selama 3 (tiga) tahun atau sampai until 8 January 2027.
tanggal 8 Januari 2027.
nnn. Pada tanggal 13 Maret 2024, EMB dan Higer Bus nnn. On March 13, 2024, EMB and Higer Bus Company
Company Limited telah menandatangani Limited signed and entered into a Distribution
Perjanjian Distribusi dimana EMB berperan Agreement where EMB acts as the Distributor for
sebagai Distributor untuk bus listrik Higer dan the electric bus of Higer and is entitled to import
berhak untuk mengimpor dan mendistribusikan and distribute the Higer Bus in the Territory as
Higer Bus di Wilayah sebagaimana dimaksud stipulated in the Distribution Agreement. The
dalam Perjanjian Distribusi. Perjanjian Distribusi Distribution Agreement is effective for 2 (two)
akan berlaku selama 2 (dua) tahun. years.
ooo. Pada tanggal 2 Oktober 2023, EMB dan PT Bank ooo. On October 2, 2023, EMB and PT Bank KB
KB Bukopin Tbk (“Bukopin”) menandatangani Bukopin Tbk (“Bukopin”) entered into facility
perjanjian fasilitas, dimana Bukopin bersedia agreement, wherein Bukopin agreed to provide
memberikan fasilitas berikut ini kepada EMB: EMB with the following facilities:
• Uncommitted LC atau SKBDN dengan baki • Uncommitted LC or SKBDN at the amount of
kredit sebesar US$20.000.000 atau setara US$20,000,000 or its equivalent in other
dalam mata uang lainnya, dengan jangka currencies, valid 12 months effective from
waktu 12 bulan sejak ditandatanganinya signing of the facility. Issuance cost is 0.25%
fasilitas. Biaya penerbitan sebesar 0,25% per month of LC or SKBDN issued (minimum
per bulan dari LC atau SKBDN yang of US$ 50), while acceptance cost is 1.5%
diterbitkan (minimal US$ 50), sedangkan per annum for each issuance of the
biaya akseptasi adalah 1,5% per tahun per acceptance (minimum of US$50).
penerbitan akseptasi (minimal US$50).
• Uncommitted kredit modal kerja dengan baki • Uncommitted working capital facility at the
kredit sebesar US$20.000.000 atau setara amount of US$20,000,000 or its equivalent
dalam mata uang lainnya, dengan jangka in other currencies, valid 12 months
waktu 12 bulan sejak ditandatanganinya effective from signing of the facility. The
fasilitas. Pinjaman dikenakan bunga sebesar loan bears interest rate at 3-months SOFR
SOFR 3 bulan ditambah 3%, terutang setiap plus 3%, payable monthly, while the
bulan, sedangkan pokok pinjaman principal is paid at the latest on the maturity
dibayarkan paling lambat pada tanggal jatuh date of the facility. The loan is used to
tempo fasilitas. Pinjaman ini digunakan finance electric vehicle and commercial
untuk pembiayaan bank atas kendaraan vehicle.
listrik dan komersial.
- 213 -
Page 218
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
Fasilitas ini mempunyai beberapa persyaratan The facility contains certain covenants that
yang harus dipenuhi oleh EMB, termasuk require EMB to fulfill, including some ratios
pemenuhan beberapa ratio yang dihitung measured based on the financial performance at
berdasarkan kinerja keuangan Perusahaan secara the Company’s consolidation level.
konsolidasian.
Pada tanggal 30 September 2024, EMB telah As of September 30, 2024, EMB has utilized
menggunakan US$ 1.631.551 (31 Desember US$ 1,631,551 (December 31, 2023:
2023: US$ 1.703.186) dari fasilitas LC/SKBDN US$ 1,703,186) of the LC/SKBDN facility and
yang diberikan dan melakukan pembayaran made a principal payment of US$ 1,939,307.
pokok sebesar US$ 1.939.307
Saat ini perjanjian fasilitas dengan KB Bukopin Currently the facility agreement with KB Bukopin
dalam proses perpanjangan dikarenakan berakhir is in the process of being extended as it expires
pada tanggal 2 Oktober 2024. on October 2, 2024.
ppp. Pada tanggal 17 Oktober 2023, PT Xapiens ppp. On October 17, 2023, PT Xapiens Teknologi
Teknologi Indonesia (“XTI”) menandatangani Indonesia (“XTI”) signed facility agreement with
perjanjian fasilitas dengan PT Bank OCBC NISP PT Bank OCBC NISP Tbk (“OCBC”), wherein
Tbk (“OCBC”), dimana OCBC memberikan OCBC agreed to provide the following facilities to
beberapa fasilitas berikut kepada XTI: XTI:
Periode Pembayaran
Fasilitas/ Jenis Fasilitas/ Nilai/ Pembayaran Kembali/ Bunga/ Jaminan/ bunga/ Interest
Facility Type of Facility Amount Repayment Interest Guarantee payment method
Term loan 1 yang bersifat Membiayai pembelian Rp15.000.000.000 31 Maret 2029 dengan 36 kali 8,5% per tahun, floating mengikuti Jaminan fidusia atas Bulanan/
comitted/ bahan terkait proyek angsuran per bulan, dimana angsuran cost of fund bank yang mengikuti tagihan XTI dari PT Pos Monthly basis
Commited Term loan 1 jangka panjang dengan pertama dilakukan pada bulan tingkat suku bunga Bank Indonesia/ Indonesia sampai dengan
PT Pos Indonesia/ berikutnya setelah masa grace period 8.5% per annum, floating based on nilai jaminan Rp
To finance purchase of 3 bulan berakhir/ March 31, 2029 with Bank's cost of fund referred to Bank 18.750.000.000/
material related to long 36 monthly installments where first Indonesia's interest rate Fiducia on XTI's accounts
term contracts with PT installment starts on the next month receivable from PT Pos
Pos Indonesia after end of 3-month grace period Indonesia up to the
amount of Rp
18,750,000,000
Term loan 1 yang bersifat Membiayai pembelian Rp20.000.000.000 60 bulan untuk setiap proyek (tidak 8,5% per tahun, floating mengikuti Jaminan fidusia atas Bulanan/
comitted/ yang dibutuhkan untuk termasuk grace period yang terhitung cost of fund bank yang mengikuti tagihan XTI dari PT Pos Monthly basis
Commited Term loan 1 proyek jangka panjang 9 bulan sejak tanggal penarikan tingkat suku bunga Bank Indonesia/ Indonesia sampai dengan
XTI/ pertama) atau berdasarkan tanggal 8.5% per annum, floating based on nilai jaminan Rp
To finance purchase jatuh tempo kontrak atau periode Bank's cost of fund referred to Bank 25.000.000.000/
related to long-term proyek (mana yang lebih dulu) dengan Indonesia's interest rate Fiducia on XTI's accounts
contracts of XTI angsuran per bulan dimulai dari akhir receivable from PT Pos
grace period/ 60 months for each Indonesia up to the
project (excluding nine months grace amount of Rp
period from first drawdown) or based 25,000,000,000
on maturity date of the contract pr
project period (whichever earlier)
with monthly installments starting
from end of grace period)
Demand loan yang bersifat Membiayai kebutuhan Rp35.000.000.000 16 Oktober 2024 (12 bulan)/ 8% per tahun, floating mengikuti Jaminan fidusia atas Sesuai dengan
uncomitted/ Uncomitted modal kerja rutin terkait October 16, 2024 (12 months) cost of fund bank yang mengikuti tagihan XTI dari PT Pos tanggal yang
demand loan proyek/ tingkat suku bunga Bank Indonesia/ Indonesia sampai dengan ditentukan lebih
To finance routine 8% per annum, floating based on nilai jaminan Rp lanjut dengan
working capital related Bank's cost of fund referred to Bank 43.750.000.000/ perjanjian/
to projects Indonesia's interest rate Fiducia on XTI's accounts In accordance with
receivable from PT Pos the dates
Indonesia up to the determinded further
amount of Rp in the agreement
43,750,000,000
Bank Garansi (BG)/Standby Memfasilitasi penerbitan Rp10.000.000.000 16 Oktober 2024/
Letter of Credit (SBLC) yang jaminan (counter October 16, 2024 Biaya penerbitan BG/SBLC: 0,5% - -
bersifat uncomitted/ guarantee) untuk proyek per tahun dari setiap penerbitan
Uncomitted Bank Guarantee XTI/ to facilitate BG/SBLC/
(BG) Standby Letter of Credit guarantee (and counter Issuance fee of BG/SBLC: 0.5% per
(SBLC) guarantee) for XTI's anum for each issuance of BG/SBLC
projects
Fasilitas ini mencakup persyaratan tertentu, The facility contains certain covenants, including
termasuk mempertahankan rasio keuangan, maintaining certain financial ratios, as further
sebagaimana dijabarkan lebih lanjut dalam detailed in the agreement.
perjanjian.
- 214 -
Page 219
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
qqq. Pada tanggal 30 Oktober 2023, KSH (entitas rrr.qqq. On October 30, 2023, KSH (a subsidiary) entered
anak) menandatangani perjanjian sewa into leasing agreement with Perusahaan Umum
menyewa dengan Perusahaan Umum (Perum) (Perum) Damri wherein KSH agreed to lease 26
Damri dimana KSH sepakat untuk menyewakan units of electric bus and 8 units of charger to
26 unit bus listrik dan 8 unit charger kepada Damri for a period of five years, extendable for
Damri untuk jangka waktu lima tahun, dapat another five years subject to evaluation of the
diperpanjang selama lima tahun lagi tergantung lease. Should there be absence of the evaluation,
pada evaluasi sewa. Jika tidak ada evaluasi, maka then the agreement is automatically extended.
perjanjian secara otomatis diperpanjang.
Perjanjian tersebut menetapkan beberapa syarat The agreement sets-up several terms and
dan ketentuan untuk sewa, antara lain conditions for the lease, including among others
perhitungan kilometer layanan selama masa calculation of kilometer of services during the
sewa, harga sewa, asuransi dan pemeliharaan lease period, lease price, insurance and
unit dan detail spesifikasi unit.
maintenance of the units and detail specification
of the units.
sss.
sss. KSH dan KRO (entitas anak) menandatangani ttt. rrr. KSH and KRO (subsidiaries) entered into leasing
perjanjian sewa menyewa dengan PT Pixel agreement with PT Pixel Komunitas (Pixel)
Komunitas (Pixel) dimana KSH dan KRO masing wherein KSH and KRO each agreed to lease 1
– masing sepakat untuk menyewakan 1 unit bus unit of electric bus, 1 unit of wall charger and 5
listrik dan 1 unit wall charger serta 5 unit motor units of electric motors, respectively, to Pixel for
listrik kepada Pixel untuk jangka waktu lima a period of five years from June 3, 2024 to June
tahun dari tanggal 3 Juni 2024 sampai dengan 2 2, 2029, extendable for another five years
Juni 2029, dapat diperpanjang selama lima tahun subject to evaluation of the lease. Should there
lagi tergantung pada evaluasi sewa. Jika tidak be absence of the evaluation, then the
ada evaluasi, maka perjanjian secara otomatis agreement is automatically extended.
diperpanjang.
Perjanjian tersebut menetapkan beberapa syarat The agreement sets-up several terms and
dan ketentuan untuk sewa, antara lain conditions for the lease, including among others
perhitungan kilometer layanan selama masa
calculation of kilometer of services during the
sewa, harga sewa, asuransi dan pemeliharaan
lease period, lease price, insurance and
unit dan detail spesifikasi unit.
maintenance of the units and detail specification
of the units.
55. ASET DAN LIABILITAS DALAM MATA UANG 55. MONETARY ASSETS AND LIABILITIES
ASING DENOMINATED IN FOREIGN CURRENCIES
Pada tanggal 30 September 2024 dan 31 Desember At September 30, 2024 and December 31, 2023, the
2023, Grup mempunyai aset dan liabilitas moneter Group had monetary assets and liabilities in foreign
dalam mata uang asing sebagai berikut: currencies as follows:
- 215 -
Page 220
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
30 September/September 30, 2024 31 Desember/December 31, 2023
Mata Uang Ekuivalen Mata Uang Ekuivalen
Asing/ US$/ Asing/ US$/
Foreign Equivalent in Foreign Equivalent in
Currency US$ Currency US$
Aset Assets
Kas dan setara kas IDR 3.894.168.436.902 257.244.579 1.821.106.077.728 118.130.908 Cash and cash equivalents
JPY 900 628 3.316.908 2.357.015
SGD 2.068.826 1.611.048 1.712.992 1.301.371
EUR 5.391 6.002 884.409 983.287
AUD 171.178 117.796 166.892 114.380
INR 84.696 1.011 84.971 1.020
QAR 7.002 1.919 7.024 1.925
CNY 9.600 1.369 - -
PGK 751 189 - -
Aset keuangan lainnya IDR 47.544.355.602 3.140.729 48.723.115.880 3.160.555 Other financial assets
Piutang usaha IDR 2.440.572.308.316 161.221.582 1.892.016.301.624 122.730.689 Trade accounts receivable
Piutang lain-lain IDR 426.891.811.932 28.200.014 376.823.508.808 24.443.663 Other accounts receivable
Aset lancar lainnya IDR 81.940.268.268 5.412.886 49.827.841.856 3.232.216 Other current assets
Pajak dibayar dimuka IDR 382.613.184.901 25.391.512 839.976.879.688 54.487.343 Prepaid taxes
Klaim pengembalian pajak IDR 344.404.478.789 22.634.493 362.685.880.608 23.526.588 Claim for tax refund
Jumlah Aset 504.985.757 354.470.960 Total Assets
Liabilitas
Pinjaman jangka pendek IDR 291.453.518.628 19.253.106 347.944.901.000 22.570.375 Short-term loans
CNY 2.000.002 285.207 - -
Utang usaha IDR 3.182.069.484.144 210.204.088 1.885.140.118.152 122.284.647 Trade accounts payable
EUR 37.039 41.234 1.875 2.085
AUD 4.371 3.008 5.529 3.789
Utang pajak IDR 110.963.553.354 7.330.133 196.828.636.040 12.767.815 Taxes payable
Utang lain-lain dan Other accounts payable and
biaya masih harus dibayar IDR 1.622.348.103.798 107.170.571 1.459.235.441.448 94.657.203 accrued expenses
AUD 72.334 49.777 - -
Utang dividen IDR - - 165.614.088 10.743 Dividend payable
Provisi rehabilitasi tambang, Provision for mine rehabilitation,
penutupan tambang dan mine closure and
pembongkaran IDR 668.571.874.182 44.165.139 666.975.382.824 43.265.139 decommissioning
Liabilitas imbalan kerja IDR 436.211.778.978 28.815.681 407.174.560.440 26.412.465 Employment benefit obligation
Jumlah Liabilitas 417.317.944 321.974.261 Total Liabilities
Jumlah Aset Moneter Bersih IDR 87.667.813 32.496.699 Total Net Monetary Assets
Pada tanggal 30 September 2024 dan 31 Desember At September 30, 2024 and December 31, 2023, the
2023, kurs konversi yang digunakan Grup serta kurs conversion rates used by the Group and the prevailing
yang berlaku pada tanggal 30 Oktober 2024 adalah rates on October 30, 2024 are as follows:
sebagai berikut:
30 Oktober/ 30 September/ 31 Desember/
October 30, 2024 September 30, 2024 December 31, 2023
US$ US$ US$
Mata Uang Foreign currency
IDR 0,0001 0,0001 0,0001 IDR
SGD 0,7548 0,7787 0,7597 SGD
AUD 0,6566 0,6882 0,6854 AUD
EUR 1,0810 1,1133 1,1118 EUR
JPY 0,6529 0,6980 0,0071 JPY
QAR 0,2733 0,2741 0,2750 QAR
INR 0,0118 0,0119 0,0120 INR
CNY 0,1400 0,1426 0,1407 CNY
PGK 0,2498 0,2516 0,2683 PGK
Sehubungan dengan fluktuasi kurs mata uang asing In relation with fluctuation of US$ against foreign
US$ terhadap mata uang asing, Grup mencatat currencies, the Group recorded net loss on foreign
kerugian selisih kurs mata uang asing bersih sebesar exchange of US$ 4,502,818 in 2024 (2023: gain of
US$ 4.502.818 pada tahun 2024 (2023: keuntungan US$ 824,680).
sebesar US$ 824.680).
56. PENGUNGKAPAN TAMBAHAN ATAS AKTIVITAS 56. SUPPLEMENTAL DISCLOSURES ON NONCASH
INVESTASI NON KAS INVESTING ACTIVITIES
Grup melakukan transaksi non kas yang tidak Group have non-cash activities that were not
disajikan dalam laporan arus kas konsolidasian presented in the consolidated statements of cash
dengan rincian sebagai berikut: flows with details as follows:
- 216 -
Page 221
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
2024 2023
US$ US$
Additions of property, plant and equipment
Perolehan aset tetap dan aset hak guna melalui: and right of use assets through:
Utang bank dan utang lain-lain 5.366.618 29.358.607 Bank loan and other payable
Liabilitas sewa 7.854.057 21.607.377 Leased liabilities
Penambahan aset eksplorasi dan evaluasi Additions of exploration and evaluation assets
dan properti pertambangan melalui utang 2.681.952 - and mining properties through payable
Penambahan aset tidak berwujud melalui utang 744.793 909.106 Additions of intangible assets through payable
Peningkatan utang bank melalui invoicing facility - 6.500.000 Increase in bank loan through invoicing facility
Penerimaan setoran modal non-tunai dalam Non-cash capital injection received in form of
bentuk aset tidak berwujud - 2.000.000 intangible assets
<,
57. REKONSILIASI LIABILITAS YANG TIMBUL DARI 57. RECONCILIATION OF LIABILITIES ARISING
AKTIVITAS PENDANAAN FROM FINANCING ACTIVITIES
Tabel di bawah ini menjelaskan perubahan dalam The table below details changes in the Group’s
liabilitas Grup yang timbul dari aktivitas pendanaan, liabilities arising from financing activities, including
termasuk perubahan yang timbul dari arus kas dan both cash and non-cash changes. Liabilities arising
perubahan non kas. Liabilitas yang timbul dari from financing activities are those for which cash flows
aktivitas pendanaan adalah liabilitas yang arus kas, were, or future cash flows will be, classified in the
atau arus kas masa depannya, diklasifikasikan dalam Group’s consolidated statement of cash flows as cash
laporan arus kas konsolidasian Grup sebagai arus kas flows from financing activities.
dari aktivitas pendanaan.
Non kas/Non-cash
Amortisasi
biaya transaksi dan
pengaruh perubahan Bunga yang
Arus kas bersih dari kurs/ Amortization of dikapitalisasi Pengambilalihan saham
1 Januari/ aktivitas pendanaan/ transaction cost and ke pokok/ Interest tambahan NAN/ 30 September/
January 1, Financing foreign exchange capitalization Additional shares Perubahan nonkas/ September 30,
2024 cashflows - net impact to principles acquisition NAN Noncash changes 2024
US$ US$ US$ US$ US$ US$ US$
Pinjaman jangka pendek 58.409.213 12.548.630 (89.380) (203.715) 439.000 - 71.103.748 Short-term loans
Pinjaman jangka panjang 163.826.095 343.522.331 130.885 88.393 46.397 - 507.614.101 Long- term loans
Pinjaman yang dapat dikonversikan 20.092.531 2.481.898 18.102 - - (686.291) 21.906.240 Convertible loan
Liabilitas sewa 16.320.413 (8.517.047) (1.987.106) (455.661) - 7.854.057 13.214.656 Lease liabilities
Utang obligasi 833.281.900 (169.085.453) (1.592.859) 13.828.972 - (1.241.000) 675.191.560 Bonds payable
Premium utang obligasi - (3.854.138) 3.854.138 - - - - Premium on bonds payable
Biaya transaksi - (5.759.895) 4.205.587 - - 1.554.308 - Transaction cost
1.091.930.152 171.336.326 4.539.367 13.257.989 485.397 7.481.074 1.289.030.305
Non kas/Non-cash
Amortisasi Dipindahkan ke aset
biaya transaksi dan tidak lancar yang
pengaruh perubahan Bunga yang dimiliki untuk dijual
Arus kas bersih dari kurs/ Amortization of dikapitalisasi Efek dekonsolidasi (Catatan 13)/
1 Januari/ aktivitas pendanaan/ transaction cost and ke pokok/ Interest EMITS/ Transfer to non 31 Desember/
January 1, Financing foreign exchange capitalization Effect of EMITS Perubahan nonkas/ current assets held December 31,
2023 cashflows - net impact to principal deconsolidation Noncash changes for sale (Note 13) 2023
US$ US$ US$ US$ US$ US$ US$ US$
Pinjaman jangka pendek 50.538.098 21.361.799 923.844 (2.213.484) (16.856.133) 4.655.089 - 58.409.213 Short-term loans
Pinjaman jangka panjang 141.381.463 21.003.941 1.312.482 128.209 - - - 163.826.095 Long- term loans
Pinjaman dapat dikonversi 7.538.295 20.350.000 - 1.663.470 - (9.459.234) - 20.092.531 Convertible loan
Liabilitas sewa 5.813.005 (11.742.123) 133.883 (1.504.031) - 23.998.480 (378.801) 16.320.413 Lease liabilities
Utang obligasi 891.731.191 (63.185.000) 5.520.079 (784.370) - - - 833.281.900 Bonds payable
1.097.002.052 (12.211.383) 7.890.288 (2.710.206) (16.856.133) 19.194.335 (378.801) 1.091.930.152
58. KONDISI EKONOMI 58. CURRENT ECONOMIC CONDITION
Berdasarkan data historis harga batubara sangat Based on historical data, coal prices are very volatile.
fluktuatif. Fluktuasi harga batubara yang terus Continued fluctuation of coal price in the future may
berlanjut di masa datang dapat mempengaruhi affect Group’s and/or its customers’ operations. In
operasi Grup dan/atau pelanggan Grup. Dampak addition, the effects of the economic situation on the
keadaan ekonomi juga mempengaruhi kondisi financial condition of the customers have increased
keuangan para pelanggan yang meningkatkan risiko the credit risk inherent in the receivables from
tidak tertagihnya piutang dari pelanggan. Disamping customers. In addition, there is an uncertain risk from
itu terdapat risiko dari ketidakpastian kebijakan Indonesian government policy in mining regulation.
pemerintah Indonesia dalam perizinan
pertambangan.
- 217 -
Page 222
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
Perubahan kondisi ekonomi tergantung kepada Changes in the economic condition is dependent on
kondisi ekonomi global - suatu tindakan yang berada global economic conditions, which is beyond the
diluar kendali Grup. Oleh karena itu, tidaklah mungkin Group’s control. It is not possible to determine the
untuk menentukan dampak masa depan kondisi future effect the economic condition may have on the
ekonomi terhadap likuiditas dan pendapatan Grup Group’s liquidity and earnings, including the effect
atau pengaruh krisis terhadap investor, pelanggan, flowing through from its investors, customers and
dan pemasok Grup. suppliers.
Manajemen menyakini bahwa Grup memiliki sumber The management believes that the Group has
daya yang cukup untuk melanjutkan operasinya di adequate resources to continue its operations for the
masa depan sehingga laporan keuangan near future. Accordingly, the Group continues to
konsolidasian tetap dapat disajikan dengan adopt the going concern basis in preparing the
mempertahankan asumsi kelangsungan usaha. consolidated financial statements.
59. LABA TIDAK DICADANGKAN DAN DIVIDEN 59. UNAPPROPRIATED RETAINED EARNINGS AND
TUNAI CASH DIVIDENS
a. Berdasarkan Rapat Umum Pemegang Saham a. Based on Annual General Meeting of Shareholders
Tahunan Perusahaan tanggal 19 April 2023, of the Company dated April 19, 2023, it was
diputuskan antara lain sebagai berikut: approved among other things, as follow:
• Pembagian dividen final sebesar • Distribution of final dividend at the amount
US$ 113.169.140 yang merupakan 25% dari of US$ 113,169,140 representing 25% of the
laba konsolidasian Perusahaan untuk tahun Company’s year 2022 consolidated profit for
2022 yang dapat diatribusikan kepada the year attributable to owners of the
entitas induk (termasuk dividen interim Company (including US$ 40,000,000 interim
sebesar US$ 40.000.000 yang dibayar pada dividend paid in August 2022). Remaining
bulan Agustus 2022). Dividen yang belum unpaid dividend of US$ 73,169,140 will be
dibayar sebesar US$ 73.169.140 akan paid in Indonesian Rupiah using middle rate
dibayarkan dalam mata uang Rupiah dengan of Bank Indonesia as of April 18, 2023 of
menggunakan kurs tengah Bank Indonesia Rp 14,773. Dividend per share is rounded up
tanggal 18 April 2023 sebesar Rp 14.773. to Rp 208.
Dividen per saham dibulatkan menjadi
Rp 208.
• Pencadangan laba ditahan sebesar • Appropriation retained earnings of
US$ 6.065.935 sebagai tambahan dana US$ 6,065,935 as an additional to the
cadangan wajib Perusahaan sesuai dengan Company’s mandatory reserve fund to
ketentuan Pasal 70 Undang-undang No. 40 comply with Article 70 Law No. 40 of 2007 as
tahun 2007 sebagaimana terakhir diubah last amended by Law No. 11 of 2020
dengan Undang-undang No. 11 tahun 2020 concerning Job Creation. Total Company’s
tentang Cipta Kerja. Jumlah laba ditahan appropriated retained earnings after the
yang dicadangkan Perusahaan setelah above is US$ 11,378,431.
keputusan diatas menjadi sebesar
US$ 11.378.431.
b. Berdasarkan Rapat Umum Pemegang Saham b. Based on Annual General Meeting of Shareholders
Tahunan Perusahaan tanggal 6 Mei 2024, of the Company dated May 6, 2024, it was
diputuskan antara lain pembagian dividen final approved among other things, distribution of final
sebesar US$ 30,000,000 (setara dengan Rp dividend at the amount of US$ 30,000,000
479.340.000.000, dikonversi menggunakan kurs (equivalent to Rp 479,340,000,000, translated
tengah Bank Indonesia pada tanggal using Bank Indonesia middle rate at recording
pencatatan), yang merupakan kurang lebih 25% date), representing approximately 25% of the
dari laba konsolidasian Perusahaan yang dapat Company’s consolidated profit attributable to
diatribusikan kepada pemilik entitas induk untuk owners of the Company for financial year 2023.
tahun buku 2023. Dividen per saham dibulatkan Dividend per share is rounded up to
menjadi US$0.0057662. US$0,0057662.
- 218 -
Page 223
PT. INDIKA ENERGY Tbk. DAN ENTITAS ANAK PT. INDIKA ENERGY Tbk. AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
30 SEPTEMBER 2024 (TIDAK DIAUDIT) DAN 31 DESEMBER 2023 SEPTEMBER 30, 2024 (UNAUDITED) AND DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA AND FOR THE NINE-MONTH PERIODS ENDED
TANGGAL 30 SEPTEMBER 2024 DAN 2023 (TIDAK DIAUDIT) SEPTEMBER 30, 2024 AND 2023 (UNAUDITED)
(Lanjutan) (Continued)
60. PERISTIWA SETELAH PERIODE PELAPORAN 60. EVENTS AFTER THE REPORTING PERIOD
a. Pada tanggal 25 Oktober 2024, PT Zeze Ajuwel a. On October 25, 2024, PT Zeze Ajuwel Tambang
Tambang melakukan realisasi pembayaran has made a payment of US$7,500,000 to IMG,
sebesar US$7.500.000 kepada IMG atas following its additional participation in Convertible
penambahan keikutsertaan dalam Pinjaman Loan Series B (Note 32).
Konversi Seri B (Catatan 32).
b. On October 25, 2024, KJA has used credit facility
b. Pada tanggal 25 Oktober 2024, KJA
from PT Bank Mandiri (Persero) Tbk (Note 54)
menggunakan fasilitas kredit dari PT Bank
Mandiri (Persero) Tbk (Catatan 54) sebesar amounting to Rp389,875,000,000 (equivalent to
Rp389.875.000.000 (setara dengan US$25,003,207) which will mature on January 22,
US$25.003.207) yang akan jatuh tempo pada 2025.
tanggal 22 Januari 2025.
c. Pada bulan Oktober 2024, CSTS JO menerima c. In October 2024, CSTS JO received refund from
pengembalian lebih bayar PPN untuk periode Juli VAT overpayment claim for the period of July 2023
2023 sampai dengan Agustus 2023 dan to August 2023 and refund of tax penalty for the
pengembalian denda pajak untuk periode Januari period from January 2020 to February 2020
2020 sampai dengan Febuari 2020 dengan totaling to approximately Rp145.8 billion
jumlah kurang lebih sebesar Rp145,8 miliar (equivalent to US$ 9,250,376).
(setara dengan US$ 9.250.376).
TPEC dan TPE menerima pengembalian pajak TPEC and TPE received CSTS JO’s such claims for
CSTS JO tersebut sebesar masing-masing 28%
tax refund at 28% and 2%, respectively, of total
dan 2% dari nilai klaim sesuai porsi
claims according to their participating portion.
partisipasinya.
61. TANGGUNG JAWAB MANAJEMEN DAN 61. MANAGEMENT’S RESPONSIBILITY AND
PERSETUJUAN ATAS LAPORAN KEUANGAN APPROVAL OF CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
Penyusunan dan penyajian wajar laporan keuangan The preparation and fair presentation of the
konsolidasian dari halaman 1 sampai 219 merupakan consolidated financial statements on pages 1 to 219
tanggung jawab manajemen, dan telah disetujui oleh were the responsibilities of the management, and
Direksi untuk diterbitkan pada tanggal 30 Oktober were approved by the Company’s Directors and
2024. authorized for issue on October 30, 2024.
- 219 -
Names mentioned 173 people and organisations named in the text · linked when the evidence is strong
unresolved
org
PT Cotrans Asia
p.8 ×5
unresolved
org
PT Cotrans Asia Pencadangan
p.8
unresolved
org
PT Bioneer
p.8
unresolved
org
PT Bioneer Indika Group
p.8 ×2
unresolved
person
Hasanal Yani Ali Amin
p.10 ×2
unresolved
org
Menteri Kehakiman dan Hak Asasi Manusia
p.10
unresolved
org
Minister of Republik Indonesia
p.10
unresolved
person
Aryanti Artisari
· Notaris
p.10
unresolved
org
Ministry of Law and Human Kementerian Hukum dan Hak Asasi Manusia
p.10
unresolved
person
Azis Armand
· Wakil Direktur Utama
p.10 ×2
unresolved
person
Kamen Kamenov Palatov
· Direktur
p.10 ×2
unresolved
org
Indonesia Stock Exchange
p.11 ×3
unresolved
org
PT Indika Inti Corpindo
p.13 ×3
unresolved
org
PT Citra Indah Prima
p.13
unresolved
org
Indika Capital Pte. Ltd.
p.13
unresolved
org
Indika Capital Resources Limited
p.13
unresolved
org
PT Kideco Jaya Agung
p.13
unresolved
org
PT Indy Properti Indonesia
p.13 ×2
unresolved
org
PT Indika Indonesia Resources
p.13
unresolved
org
Indika Capital Investments Pte. Ltd
p.13
unresolved
org
Indika Energy Trading Pte. Ltd.
p.13
unresolved
org
PT Indika Energi Trading
p.13
unresolved
org
PT Tripatra Multi Energi
p.13
unresolved
org
PT Tripatra Engineers
p.13 ×3
unresolved
org
Pte. Ltd
p.14
unresolved
org
Investment Tripatra Investment Limited
p.14
unresolved
org
PT Tripatra Engineering
p.14
unresolved
org
PT Indika Multi Energi Internasional
p.14
unresolved
org
PT Prasarana Energi Indonesia
p.14
unresolved
org
PT Prasarana Energi Cirebon
p.14
unresolved
org
Indika Power Investments Pte. Ltd.
p.14
unresolved
org
PT Indika Infrastruktur Investindo
p.14
unresolved
org
PT Indika Energy Infrastructure
p.14
unresolved
org
PT Interport Mandiri Utama
p.14
unresolved
org
PT Indika Logistic
p.15
unresolved
org
PT Interport Mandiri Abadi
p.15
unresolved
org
PT Kariangau Gapura Terminal Energi
p.15
unresolved
org
PT Jatim Gapura Terminal Energi
p.15
unresolved
org
PT Indika Multi Niaga
p.15
unresolved
org
PT Mitra Baruna Nusantara
p.15
unresolved
org
PT Elang Mas Andalan
p.15
unresolved
org
PT Interport Praba Prasarana
p.15
unresolved
org
PT POSB Reksabumi Indonesia
p.15 ×2
unresolved
org
PT Pusat Sarana Baruna
p.15
unresolved
org
Nusantara Resources Limited
p.18
unresolved
org
Development Stage Salu Siwa Pty Limited
p.18
unresolved
org
PT Masmindo Dwi Area
p.18
unresolved
org
PT Rockgeo Energi Nusantara
p.18
unresolved
org
PT Perkasa Investama Mineral
p.18 ×2
unresolved
org
PT Mekko Metal Mining
p.18 ×2
unresolved
org
PT Perkasa Alumina Indonesia
p.18
unresolved
org
PT Solusi Mobilitas Indonesia
p.18 ×2
unresolved
org
PT Foxconn Indika Motor
p.20 ×2
unresolved
org
PT Energi Makmur Buana
p.20 ×2
unresolved
org
PT Kalista Nusa Armada
p.20 ×6
unresolved
org
PT Kalista Rotom Orbita
p.20 ×6
unresolved
org
PT Kalista Soter Hastia
p.21 ×6
unresolved
org
PT Kalista Nayara Dayautama
p.21 ×6
unresolved
org
PT Kalista Biru Nusantara
p.21 ×6
unresolved
org
PT Industri Baterai Nusantara
p.21 ×6
unresolved
org
PT Imeco Multi Prasarana
p.22 ×4
unresolved
org
Bioneer Corporation Korea Bioneer Corporation
p.22
unresolved
org
PT Natura Aromatik Nusantara
p.23 ×6
unresolved
org
PT Indika Multi
p.23 ×2
unresolved
org
PT Indika Multi Properti Properti
p.23
unresolved
org
PT Laras Ekosistem Organik
p.23 ×6
unresolved
org
Novotel International Care Extracts Limited
p.23
unresolved
org
International Care Extracts Limited
p.23
unresolved
org
PT Esensi Natura Nusantara
p.23
unresolved
person
Notary Ungke Mulawanti
· Notaris
p.23 ×30
unresolved
person
Mulawanti
· Notaris
p.23 ×7
unresolved
person
MKn. Mulawanti
p.23
unresolved
org
PT Genomik Solidaritas Indonesia
p.25 ×4
unresolved
org
Yayasan Indika Untuk Indonesia
p.25 ×3
unresolved
org
PT Interport
p.26 ×3
unresolved
org
Menteri
p.26 ×5
unresolved
org
Ministry of Laws and Human Rights
p.26 ×4
unresolved
org
PT Indika Bioneer Group
p.26 ×3
unresolved
org
PT Indika Medika Nusantara
p.26 ×3
unresolved
org
Bioneer Corporation
p.26 ×4
unresolved
org
PT Bioneer Indika
p.26
unresolved
org
Ministry of Law and Human
p.27
unresolved
org
PT Indika Bioneer Diagnostika
p.27 ×3
unresolved
org
PT Bioneer Indika Diagnostika
p.27 ×2
unresolved
org
Ministry of Law and Human Rights
p.27
unresolved
org
Menteri Hukum dan Hak Asasi Manusia
p.27
unresolved
org
Ministry of Hukum dan Hak Asasi Manusia
p.29 ×2
unresolved
org
PT Manufaktur Teknologi Baterai
p.30 ×5
unresolved
org
Ministry of Laws
p.30
unresolved
org
PT Indika Multi Properti
p.30 ×2
unresolved
org
PT Laras
p.30 ×11
unresolved
org
PT Interport Mandiri Utama Mandiri
p.31
unresolved
org
PT Interport Mandiri Mandiri
p.31
unresolved
org
PT Kalimantan Citra
p.31
unresolved
org
PT Kalimantan Citra Bara
p.31
unresolved
org
PT Electra Mobilitas Indonesia
p.31 ×3
unresolved
org
PT Ilectra Motor Group
p.31 ×3
unresolved
org
PT Mitra Paramarta
p.31
unresolved
org
PT Mitra Paramarta Prima Prima
p.31
unresolved
org
Prime Empire Investments Pte. Investments Pte. Ltd.
p.32
unresolved
org
Kementerian Energi
p.32
unresolved
org
Ministry of Energy and Mineral Resources dan Sumber Daya Mineral
p.32
unresolved
org
Menteri Energi
p.32 ×3
unresolved
org
Minister of Energy
p.32 ×2
unresolved
org
Ministry of Energy and Mineral Resources Pajak
p.33
unresolved
org
Kementerian Energi dan Sumber Daya
p.33
unresolved
org
Ministry of Energy and Mineral Resources. Kementrian Energi dan Sumber Daya Mineral. Barang Milik
p.33
unresolved
org
PT Runge Pincock Runge Pincock Minarco
p.35
unresolved
org
Government of the Republic of Indonesia
p.35
unresolved
org
Ministry of Energy
p.35
unresolved
org
Menteri Energi dan Sumber Daya
p.36
unresolved
org
PT Cirebon Power Services
p.45 ×3
unresolved
org
PT Indika Digital Teknologi
p.45
unresolved
org
PT Zebra Cross Teknologi
p.45
unresolved
org
PT Xapiens Teknologi Indonesia
p.45
unresolved
org
PT Pan Indo Resources
p.45
unresolved
org
PT Mahabharata Dharma Ekatama
p.45
unresolved
org
PT Telaga Mas Kalimantan
p.45
unresolved
org
PT Jaya Bumi Paser
p.45
unresolved
org
PT Diva Perdana Pesona
p.45
unresolved
org
PT Trisetia Citagraha
p.45
unresolved
org
PT Sumber Multi Energi Penajam
p.45 ×3
unresolved
org
PT Indika Tenaga Baru
p.45
unresolved
org
PT Empat Mitra Indika Tenaga Surya
p.45 ×5
unresolved
org
PT Electra Distribusi Indonesia
p.46
unresolved
org
PT Electra Auto Indonesia
p.46
unresolved
org
PT Empat Mitra Indika Mentari
p.46
unresolved
org
PT Sea Bridge Shipping
p.111 ×8
unresolved
org
PT Mitra Samudra Indonesia
p.111 ×5
unresolved
org
PT Mitra Samudra
p.111
unresolved
org
PT Narada Sahara Kencana
p.111 ×5
unresolved
org
Indika Ventures Pte. Ltd.
p.111 ×2
unresolved
org
PT Narada
p.111
unresolved
org
PT Teladan
p.173 ×2
unresolved
org
PT Power Jawa Barat
p.173 ×2
unresolved
org
PT Marmitria Land
p.173 ×2
unresolved
org
PT Cirebon Electric Power
p.173 ×6
unresolved
org
PT Cirebon Energi Prasarana
p.173 ×6
unresolved
org
PT Pelabuhan Patimban Internasional
p.173 ×2
unresolved
org
PT Intan Resources Indonesia
p.173 ×2
unresolved
org
PT Cirebon Electric
p.174
unresolved
org
PT Cirebon Energi
p.174
unresolved
org
PT Cirebon Energi Prasarana. Prasarana. Piutang
p.174
unresolved
org
PT Cirebon Electric Power CSTS Joint Operation
p.174
unresolved
org
PT Zeze Ajuwel
p.223
unresolved
org
PT Zeze Ajuwel Tambang Tambang
p.223
Extraction attempts how the parser did, and what it refused
Nothing structured was extracted from this document — the attempts below say why.
No extraction attempted yet.