Skip to content
Back to announcement

20241028_RMKE_Public Expose_31750180_lamp1.pdf

Other Text extracted RMKE

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 31

Page 1
PUBLIC EXPOSE & ANALYST MEETING
            3Q 2024 RESULT ANNOUNCEMENT




       PT RMK ENERGY TBK [RMKE]
         Integrated Logistics and Commodity Company
Page 2
OUR AGENDA


      COMPANY                       OPERATIONAL
 01   OVERVIEW
                               04   PERFORMANCE



      BUSINESS & OPERATIONAL        FINANCIAL
 02   HIGHLIGHT
                               05   PERFORMANCE


      STRATEGY & OUTLOOK            APPENDIX
 03                            06



                                                  2
Page 3
     CHAPTER 1
COMPANY OVERVIEW



                   3
Page 4
COMPANY OVERVIEW

                                           PT RMK Energy Tbk (RMKE or the Company) was established in June 2009. Leveraging
                                           over 15 years of experience, the Company’s management has built a strong reputation as
                                           a reliable coal logistics service provider. To date, the Company is the largest private coal
                                           logistics provider in South Sumatra. By utilizing existing infrastructure, the Company
                                           also engages in coal trading to further enhance its revenue and profit.

                                                         The Company operates in the field of coal logistics services and coal
                                                         trading, which include rail station loading and unloading, transportation to
                                                         ports, loading onto barges, and coal trading activities.




Product & Services                                        Product & Services

 Port Services                                           The Company runs the coal trading business segment, with the following
                                                         operational flow, the Company purchases coal at the mine stockpile and
 Coal loading/loading services onto barges
                                                         transports the coal using a fleet of trucks that have become the company's
 Coal container transportation services                  partners to the train loading station. After arriving at the Company's train
 Coal container unloading services                       unloading station with the Company's unloading facilities and trucks, the coal is
                                                         transported to the port and sold to buyers on barges, heading to the users. Apart
 Coal loading services at Gunung Megang station
                                                         from that, the Company also trades coal from Jambi and other South Sumatra
 Other services and heavy equipment rental               sources.



                                                                                                                                             4
Page 5
WHY INVEST in RMKE

          STRATEGIC ASSETS LOCATION
  01      Located in a strategic area and the pioneer in South
                                                                      06   SUSTAINABLE PROFITABILITY
                                                                           Net profit CAGR 37.6%*
          Sumatera


          INTEGRATED COAL LOGISTICS SERVICE
  02      The only private coal logistics providers integrated with
                                                                      07   SOLID BALANCE SHEET
                                                                           DER 0.48 time**
          train in South Sumatra

          EFFICIENT & EFFECTIVE COAL SERVICE SOLUTIONS                     HIGH SAFETY STANDARD
  03      Competitive tariff and bigger volume; unloading time 3      08   ●   Railway is the safest mode of land transportation
          hours with volume 2,800 mt/train
                                                                           ●   Dedicated coal hauling road


          STRONG OPERATIONS
  04      ●    Coal sales volume CAGR 38.9%*
                                                                      09   LONG TRACK RECORD
                                                                           Professional and experienced management team
          ●    Coal service volume CAGR 18.0%*



  05      STRONG REVENUE GROWTH                                       10   GOOD CORPORATE GOVERNANCE
          Operating revenues CAGR 35.4%*                                   The implementation of GCG in all business lines


* CAGR 2019-2023
** Based on 2Q 2024 performance
                                                                                                                                   5
Page 6
COMPANY STRUCTURE OVERVIEW

    Tony Saputra                Suriani              PT RMK Investama           Vincent Saputra           William Saputra               Public

       1.60%                     0.96%                    76.80%                     0.32%                     0.32%                    20.00%




                               RMUK                      RMKN                       TBBE                      RMAK

                               99.99%                    99.99%                     62.00%                    99.99%


                                                           PC

                                                        100.00%

 RMUK: PT Royaltama Mulia Kencana, RMKN: PT Royaltama Multi Komoditi Nusantara, RMT: PT Royaltama Mulia Tambang, TBBE: PT Truba Bara Banyu Enim,
 RMAK: PT Royaltama Marga Kencana, PC: Pisteuo Commodities Pte. Ltd, NBT: Nusantara Bara Tambang


                                                                                                                                                   6
Page 7
MILESTONE
                                                                                                                      TBBE coal mine
                                                                                                                      began operating           Technology
                                                                                                                      and trading               upgrade in
                                                                                                                                                controlling coal
                                                                                                                      Commenced                 dust.
                                                                                                                      Operation of
                                                                The Railway                                           Gunung Megang             Telescopic chute
                                                                Unloading Station                                     Loading Facility
                                                                                                                                                with fogging
                                                                CY II began                                           with TLS
                                                                operations.                                                                     system
              The Company’s             The Railway                                                                   Commenced
              port in Kramasan,         Unloading Station       The annual                 The annual                 operations of 4th         Big gun sprinklers
              Palembang began           and Container           loading volume at          loading volume at          unloading facility
                                                                                                                                                and water sprayers
              operations with 2         Yard (CY) I began       the port reaches 4         the port reaches 5         (CY3B) at Simpang
              lines                     operations              million tons               million tons               station

                March 2014                 March 2014            December 2018              December 2020                   2022                 July 2024



  June 2009                November 2014             December 2017            October 2019             November 2021               December 2023
The Company               The annual                The annual               The third port line       Effective of the            Port Annual
established               loading volume at         loading volume at        began operations          Initial Public              loading volume
                          the port reaches 1        the port reaches 3                                 Offering (IPO)              reach 7,5 millions
                          million tons              million tons                                                                   tons

                                                                                                                                   Simpang Train
                                                                                                                                   Unloading Station
                                                                                                                                   volume reach 11,1
                                                                                                                                   millions tons



                                                                                                                                                                     7
Page 8
Commissioner

BOARD OF DIRECTOR AND BOARD OF COMMISSIONER
 Board of Commissioner                                Board of Director



                             1.   Tony Saputra                                    1.   Vincent Saputra
                                  President                                            President Director
                                  Commissioner                                    2.   William Saputra
                             2.   Rokhmad Sunanto                                      Director
                                  Independent                                     3.   Jennifer Angeline Djamin
                                  Commissioner                                         Director
                             3.   F. Saud Tamba Tua                               4.   Sugiyanto
                                  Independent                                          Director
                                  Commissioners




     2       1           3                                 2       1      3   4




                                                                                                        8
Page 9
        CHAPTER 2
BUSINESS & OPERATIONAL
      HIGHLIGHTS



                         9
Page 10
CHALLENGES IN SUMATRA

 Long hauling mines with expensive tariff    Alternative coal logistics
 Loading and unloading capacity
 constraints
 Social friction due to hauling public                       Railway
 congestion, traffic accidents, and damaged
 roads


                                                             Dedicated
                                                             coal hauling
                                                             road




                                                                            10
Page 11
SUMATRA HAS ABUNDANT COAL RESERVES



The largest coal reserves
in Indonesia

Strategic location that integrated
with logistics railways

Low stripping ratio and low
production volume




                                     11
Page 12
THE COMPETITIVENESS OF RMKE’S LOGISTICS SERVICES

    Mode of              Tariff           Volume/             Strategic      Socio-economic
 transportation                          frequency            location           context




     Railway          Rp775-900/          ̴2,800 ton/            ̴69         The integration of
                        ton/km                train         Nautical Mile    hauling road and
                                                                                  railway


 Competitiveness:   Competitiveness:   Competitiveness:   Competitiveness:   Competitiveness:
      Safest           Low tariff       Bigger volume      The nearest to      More reliable
  transportation                                             anchorage
      mode

                                                                                                  12
Page 13
COAL LOGISTICS BUSINESS PROCESS




 Carrying coal       Gunung Megang      Coal logistic by   Simpang             Kramasan Port
 from in-house       Loading Station    train              Unloading Station   with 3 lines barge
 and third parties   with Train                            with 5 Tracks       loading
 mining              Loading System                        Container Yard      conveyors
                     (TLS) and Others                      and Gantry Crane
                     Loading Station
                     in Lahat




                                                                                                    13
Page 14
RMK ENERGY PROVIDES AN INTEGRATED COAL LOGISTIC
SOLUTIONS IN SOUTH SUMATRA




                                                  14
Page 15
IN-HOUSE MINING IN SUMATRA




                                 South Sumatra
             South Sumatra        ●   Resources 148.3 mn mt
             PT Truba Bara        ●   Proven reserves 75 mn mt
                                  ●   GAR: 3,000 - 4,200
             Banyu Enim (TBBE)    ●   Stripping ratio: 4.0


                                                                 15
Page 16
GUNUNG MEGANG LOADING STATION




              Loading station      The first private     Daily capacity
              with Train Loading   loading station in   5 train set or
              System (TLS)         Muara Enim           14,000 ton


                                                                         16
Page 17
COAL HAULING ROAD




             40 km to          40 km to Lahat*     RMK Energy is building a dedicated
             Muara Enim*                           coal hauling road to open access for
                                                   coal miners in Lahat and Muara
            *Integrated with Gunung Megang Station Enim (on progress)


                                                                                     17
Page 18
UNLOADING STATION IN SIMPANG




             4 container   Capacity       Shifting technology to bottom
             yards         16             dump / side dump unloading
                           trainset/day   process
                           (2023)

                                                                          18
Page 19
MUSI 2 KRAMASAN PORT




             Integrated with   3-line barge loading conveyor,   50 ha stockpile
             8 km hauling      The capacity are 6 barges/day    with capacity
             road              equivalent 15K ton/line/day      600K ton


                                                                                  19
Page 20
THE IMPLEMENTATION OF GCG IN ALL BUSINESS LINES

Technology upgrade in controlling coal dust               Blue rating*                                Zero Fatalities
                                                          in environmental management                 over the past 7 years

                   The addition of big gun sprinklers
                   and water sprayers to spray coal
                   dust suppressant chemicals.




                    Installation of telescopic chute to
                    reduce dust pollution during coal
                    loading onto barges.




                   Frequently spraying operational
                   area with water trucks to reduce
                   dust pollution.


                                                          *Based on the Minister of Environment and
                                                          Forestry of the Republic of Indonesia

                                                                                                                              20
Page 21
      CHAPTER 3
STRATEGY & OUTLOOK



                     21
Page 22
CORPORATE STRATEGY

01   Enhancing operational efficiency


02   Acquiring and integrating business groups in the energy sector


03   Developing integrated business activities


04   Maintaining and enhancing quality, corporate governance, occupational health
     and safety, environmental stewardship, and social responsibility

05   Establishing a sustainable long-term production profile for the company




                                                                                    22
Page 23
 SUSTAINABLE
● 3Q 2024 PERFORMANCE HIGHLIGHT
 PROFITABILITY



● OUR TARGET ACHIEVEMENT IN 3Q 2024

● CORPORATE OUTLOOK




                                      23
Page 24
        CHAPTER 4
OPERATIONAL PERFORMANCE



                          24
Page 25
RECORDS THE ALL TIME HIGH VOLUME IN SEPTEMBER 2024
Service Segment Indicator: Barge Loading Volume

Quartely Performance (million ton)                            Monthly Performance (thousand ton)
                                                              September 2024 +148.9% YoY to 970.2 thousand ton
3Q 2024 +27.9% YoY to 2.5 mn mt
                                                              The all time high volume
9M 2024 +2.4% YoY to 6.4 mn mt

                                             6.2       6.4                                              917                    970
                                                                                                745              793    777
                                                                  633
                                                                         549             559
                                                                                 457
                        2.2       2.5
    2.0      1.6


    3Q        1Q        2Q         3Q         9M        9M         Jan    Feb    Mar      Apr   May      Jun      Jun   Aug    Sep
   2023      2024      2024       2024       2023      2024       2024   2024    2024    2024   2024    2024     2024   2024   2024



      Barge loading volume in million metric ton (mn mt)




                                                                                                                                      25
Page 26
PRICES REMAIN STABLE, BUT VOLUME INCREASES

Coal Sales Volume & Average Selling Price (ASP)

Coal sales volume                                    ASP
3Q 2024 +40.2% YoY to 776.6 thousand ton             3Q 2024 -14.8% YoY to IDR550.6 thousand
9M 2024 +14.1% YoY to 2.0 million ton                9M 2024 -12.3% YoY to IDR608.8 thousand


                                                   693.9

  646.3          647.7   642.1                              608.8

                                   550.6
                                                              2.02
                                                    1.77


  0.55            0.76              0.78
                         0.49

    3Q             1Q     2Q          3Q             9M        9M
   2023           2024   2024        2024           2023      2024

          Coal sales             Average selling price




                                                                                               26
Page 27
FUEL EFFICIENCY AND MANAGE OUR ON-TIME PERFORMANCE

                           3:52   3:54          3:41
                                                       Ensuring the train unloading
             3:29   3:18                 3:25          time is completed faster
                                                       than PT KAI’s specified time
                                                       limit (max 7 hours) to avoid
                                                       late fines


                                                              Unloading time (hour)
              3Q     1Q     2Q     3Q     9M     9M
             2023   2024   2024   2024   2023   2024



                                                       Maintaining a fuel
                    0.91                               usage ratio of <1
             0.88                        0.88          ton/liter

                                                0.81
                           0.79   0.78


              3Q     1Q     2Q     3Q     9M     9M
             2023   2024   2024   2024   2023   2024




                                                                                      27
Page 28
       CHAPTER 5
FINANCIAL PERFORMANCE



                        28
Page 29
 SUSTAINABLE
● CONSOLIDATED STATEMENT OF PROFIT AND LOSS
 PROFITABILITY



● CONSOLIDATED STATEMENT OF FINANCIAL POSITION

● CONSOLIDATED STATEMENT OF CASH FLOW




                                                 29
Page 30
 CHAPTER 6
APPENDIX



             30
Page 31
                                       Thank You

RMKE Investor & Public Relations   rmkenergy.com
PT RMK Energy Tbk
                                   rmke.official
Wisma RMK Lantai 2
Jalan Puri Kencana Blok M4/1
Jakarta Barat, DKI Jakarta 11610   PT RMK Energy Tbk
(021) 582 2555

File

File Open PDF
Source IDX
Size13.22 MB
Published28 Oct 2024
Pages31
Characters21,678
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 17 people and organisations named in the text · linked when the evidence is strong

linked org RMK ENERGY TBK p.1 ×13
linked person Tony Saputra p.6 ×2
linked org PT RMK Investama p.6
linked person Vincent Saputra p.6 ×2
linked person William Saputra p.6 ×2
linked person Rokhmad Sunanto p.8
linked person Jennifer Angeline Djamin p.8
linked person F. Saud Tamba Tua p.8
unresolved org PT Royaltama Mulia Kencana p.6
unresolved org PT Royaltama Multi Komoditi Nusantara p.6
unresolved org PT Royaltama Mulia Tambang p.6
unresolved org PT Truba Bara Banyu Enim p.6
unresolved org PT Royaltama Marga Kencana p.6
unresolved org Pisteuo Commodities Pte. Ltd p.6
unresolved org PT Truba Bara p.15
unresolved org Minister of Environment p.20
unresolved org PT KAI’s p.27

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result