Skip to content
Back to announcement

20240920_PGEO_Laporan Informasi dan Fakta Material_31727735.pdf

Other Text extracted PGEO

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 7

Page 1
Go To English Page

 Nomor Surat                           504/PGE500/2024-S0

 Nama Perusahaan                       PT Pertamina Geothermal Energy Tbk

 Kode Emiten                           PGEO

 Lampiran                              0
                                       Sambangi Paviliun PGE, Presiden Jokowi Saksikan Terobosan Teknologi
 Perihal
                                       untuk Maksimalkan Potensi Energi Panas Bumi


Dengan ini kami untuk dan atas nama perusahaan menyampaikan Laporan Informasi atau Fakta Material sebagai
berikut:

 Nama Emiten atau Perusahaan Publik            PT Pertamina Geothermal Energy Tbk

 Bidang Usaha                                  Menyelenggarakan usaha bidang panas bumi dari hulu/hilir



 Telepon                                       +62 21 3983 3222

 Faksimili                                     +62 21 3983 3230

 Alamat Surat Elektronik (email)               datapge@pertamina.com


 Tanggal Kejadian                              27 September 2024
 Jenis Informasi atau Fakta Material           Sambangi Paviliun PGE, Presiden Jokowi Saksikan Terobosan
                                               Teknologi untuk Maksimalkan Potensi Energi Panas Bumi
Page 2
Uraian Informasi atau Fakta Material   Pada ajang Indonesia International Geothermal Convention &
                                       Exhibition (IIGCE) 2024, Presiden Joko Widodo (Jokowi)
                                       mengunjungi paviliun PT Pertamina Geothermal Energy Tbk
                                       (PGE), Rabu (18/9). Didampingi Menteri Energi dan Sumber
                                       Daya Mineral Bahlil Lahadalia, Menteri BUMN Erick Thohir,
                                       Menteri ATR/BPN Agus Yudhoyono, Kapolri Listyo Sigit
                                       Prabowo, Direktur Jenderal EBTKE Eniya Listiani Dewi, dan
                                       Direktur Utama PT Pertamina (Persero) Nicke Widyawati,
                                       Presiden Jokowi mendengarkan langsung berbagai inisiatif
                                       PGE dalam optimalisasi teknologi guna memaksimalkan
                                       potensi panas bumi Indonesia.

                                       Direktur Utama PGE Julfi Hadi yang menyambut kunjungan
                                       Presiden Jokowi memaparkan sejumlah langkah strategis
                                       untuk mempercepat pengembangan energi panas bumi di
                                       Indonesia. Kepada Presiden, Julfi Hadi menyampaikan bahwa
                                       PGE mengelola sumber daya panas bumi yang besar yang
                                       diimbangi dengan kapasitas mumpuni untuk membuka potensi
                                       panas bumi Indonesia.

                                       PGE juga telah melakukan berbagai inisiatif yang mencakup
                                       peningkatan nilai komersial proyek, pengurangan biaya
                                       pengembangan, peningkatan kapasitas produksi, serta
                                       pengembangan teknologi inovatif seperti perangkat Flow2Max
                                       untuk mengukur fluida dua fasa panas bumi yang dipamerkan
                                       di ajang ICGE 2024.

                                       PGE berkomitmen untuk mencapai target kapasitas terpasang
                                       1 GW dalam 2-3 tahun ke depan dan berencana untuk
                                       menciptakan ekosistem ideal untuk pengembangan panas
                                       bumi di Indonesia. Dengan inovasi dan adopsi teknologi yang
                                       kami terapkan, kami mampu meningkatkan efisiensi operasi
                                       dan memaksimalkan output dari setiap sumur panas bumi
                                       yang dikelola perusahaan, ujar Julfi Hadi dalam paparan
                                       kepada Presiden Jokowi.

                                       Pada kesempatan yang sama, salah satu perwira PGE,
                                       Mohamad Husni Mubarok, PhD, penemu Flow2Max,
                                       memberikan pemaparan kepada Presiden Jokowi bahwa alat
                                       temuannya itu dirancang untuk mengatasi tantangan utama
                                       dalam pengelolaan reservoir panas bumi, yaitu belum
                                       tersedianya alat ukur fluida dua fasa panas bumi yang andal
                                       dan akurat. Kemampuan pengukuran kinerja sumur panas
                                       bumi secara akurat dan waktu nyata (real time) yang diberikan
                                       Flow2Max memungkinkan pengembang panas bumi
                                       melakukan efisiensi dan optimalisasi operasi serta
                                       memaksimalkan produksi energi.

                                       Flow2Max yang telah dipatenkan di enam negara ini adalah
                                       terobosan teknologi pertama di dunia yang meningkatkan
                                       efisiensi operasional proyek panas bumi dan membuka jalan
                                       bagi masa depan energi panas bumi berkelanjutan di
                                       Indonesia dan dunia, kata Husni.

                                       Dalam diskusi panel sesi pleno IIGCE 2024 bertajuk Making
                                       Geothermal The Energy of Today: Best Practices and
                                       Breakthroughs pada Kamis (19/9), Direktur Operasi PGE
                                       Ahmad Yani menekankan bahwa adopsi teknologi terbaru
                                       adalah kunci untuk meningkatkan efisiensi yang berujung pada
                                       pengurangan biaya pengembangan dan operasi panas bumi.
                                       Selain Flow2Max, PGE saat ini juga memanfaatkan teknologi
                                       organic rankine cycle (ORC) untuk optimalisasi pembangkit
                                       listrik panas bumi melalui proyek co-generation.
Page 3
                                           Teknologi tidak hanya meningkatkan efisiensi operasional
                                           tetapi juga berkontribusi pada penggunaan sumber daya
                                           panas bumi yang lebih berkelanjutan dan efektif. Kami sangat
                                           antusias dengan potensi teknologi yang kami miliki untuk
                                           mentransformasi dan meningkatkan kinerja proyek-proyek
                                           panas bumi, ujar Ahmad Yani dalam paparannya.

                                           Adopsi teknologi baru merupakan salah satu strategi yang
                                           ditawarkan PGE untuk menurunkan biaya pengembangan
                                           sehingga proyek panas bumi menjadi lebih menarik bagi
                                           investor. Strategi lain adalah pembaruan model bisnis dan
                                           diversifikasi bisnis bumi untuk menghasilkan produk di luar
                                           ketenagalistrikan seperti green hydrogen, green ammonia, dan
                                           silika.

                                           Selain teknologi, terobosan lain yang dijalankan PGE adalah
                                           membangun portofolio bisnis melalui integrasi vertikal sektor
                                           panas bumi, terutama di sektor manufaktur. Bersama sejumlah
                                           mitra di dalam negeri, PGE sedang menjajaki peluang untuk
                                           manufaktur komponen utama pembangkit listrik panas bumi
                                           seperti heat exchanger dan kondensor.

                                           Dengan menggenggam kemampuan produksi komponen
                                           dalam negeri serta ekspansi ke bisnis baru di luar
                                           ketenagalistrikan, PGE tak hanya memperkuat
                                           kepemimpinanya di sektor panas bumi tetapi juga meletakkan
                                           pondasi untuk menjadi geothermal center of excellence di
                                           tingkat global, tutup Ahmad.
Dampak kejadian, informasi atau fakta
material tersebut terhadap kegiatan
operasional, hukum, kondisi keuangan,
atau kelangsungan usaha Emiten atau
Perusahaan Publik



Demikian untuk diketahui.


Hormat Kami,
PT Pertamina Geothermal Energy Tbk




Kitty Andhora

Corporate Secretary




PT Pertamina Geothermal Energy Tbk
Grha Pertamina - Tower Pertamax Lt.7
Telepon : +62 21 3983 3222, Fax : +62 21 3983 3230, https://www.pge.pertamina.



Nama Pengirim                     Kitty Andhora

Jabatan                           Corporate Secretary
Tanggal dan Waktu                 20-09-2024 17:08
Page 4
   Dokumen ini merupakan dokumen resmi PT Pertamina Geothermal Energy Tbk yang tidak memerlukan tanda
tangan karena dihasilkan secara elektronik oleh sistem pelaporan elektronik. PT Pertamina Geothermal Energy Tbk
                   bertanggung jawab penuh atas informasi yang tertera didalam dokumen ini.
Page 5
Go To Indonesian Page

 Letter / Announcement No.           504/PGE500/2024-S0

 Issuer Name                         PT Pertamina Geothermal Energy Tbk

 Issuer Code                         PGEO

 Attachment                          0

 Subject                             Visit PGE Pavilion, President Jokowi Witnesses Technology Breakthrough to
                                     Maximize Geothermal Energy Potential

The company hereby announce the Material Information or Facts Report as follows

 Name of Issuer or Public Company            PT Pertamina Geothermal Energy Tbk

 Business Activities                         Menyelenggarakan usaha bidang panas bumi dari hulu/hilir


 Telephone                                   +62 21 3983 3222

 Faximile                                    +62 21 3983 3230

 Email Address                               datapge@pertamina.com


 Date of Event                               27 September 2024

                                             Visit PGE Pavilion, President Jokowi Witnesses Technology
 Type of Material Information or Facts       Breakthrough to Maximize Geothermal Energy Potential
Page 6
Description of Material Information or   At the Indonesia International Geothermal Convention &
Facts                                    Exhibition (IIGCE) 2024, President Joko Widodo (Jokowi)
                                         visited the pavilion of PT Pertamina Geothermal Energy Tbk
                                         (PGE), Wednesday (18/9). Accompanied by Minister of Energy
                                         and Mineral Resources Bahlil Lahadalia, Minister of State-
                                         owned Enterprises Erick Thohir, Minister of ATR/BPN Agus
                                         Yudhoyono, National Police Chief Listyo Sigit Prabowo,
                                         Director General of EBTKE Eniya Listiani Dewi, and President
                                         Director of PT Pertamina (Persero) Nicke Widyawati, President
                                         Jokowi listened directly to various PGE initiatives in optimizing
                                         technology to maximize Indonesia's geothermal potential.

                                         PGE President Director Julfi Hadi, who welcomed President
                                         Jokowi's visit, explained a number of strategic steps to
                                         accelerate the development of geothermal energy in
                                         Indonesia. To the President, Julfi Hadi said that PGE manages
                                         large geothermal resources that are balanced with qualified
                                         capacity to unlock Indonesia's geothermal potential.

                                         PGE has also undertaken various initiatives that include
                                         increasing the commercial value of projects, reducing
                                         development costs, increasing production capacity, as well as
                                         developing innovative technologies such as the Flow2Max
                                         device to measure geothermal two-phase fluids that was
                                         showcased at ICGE 2024.

                                         PGE is committed to achieving the 1 GW installed capacity
                                         target in the next 2-3 years and plans to create an ideal
                                         ecosystem for geothermal development in Indonesia. With our
                                         innovation and technology adoption, we are able to improve
                                         operating efficiency and maximize the output of each
                                         geothermal well managed by the company, Julfi Hadi said in a
                                         presentation to President Jokowi.

                                         On the same occasion, one of PGE's officers, Mohamad Husni
                                         Mubarok, PhD, the inventor of Flow2Max, told President
                                         Jokowi that his invention was designed to overcome the main
                                         challenge in geothermal reservoir management, namely the
                                         unavailability of a reliable and accurate geothermal two-phase
                                         fluid measurement tool. The ability to measure geothermal well
                                         performance accurately and in real time provided by Flow2Max
                                         allows geothermal developers to make efficiency and optimize
                                         operations and maximize energy production.

                                         Flow2Max, which has been patented in six countries, is the
                                         world's first technological breakthrough that improves the
                                         operational efficiency of geothermal projects and paves the
                                         way for the future of sustainable geothermal energy in
                                         Indonesia and the world, Husni said.

                                         In the IIGCE 2024 plenary session panel discussion titled
                                         Making Geothermal The Energy of Today: Best Practices and
                                         Breakthroughs on Thursday (19/9), PGE Operations Director
                                         Ahmad Yani emphasized that the adoption of the latest
                                         technology is key to improving efficiency that leads to reduced
                                         geothermal development and operation costs. In addition to
                                         Flow2Max, PGE currently also utilizes organic rankine cycle
                                         (ORC) technology for the optimization of geothermal power
                                         generation through co-generation projects.

                                         Technology not only improves operational efficiency but also
                                         contributes to a more sustainable and effective use of
                                         geothermal resources. We are excited about the potential of
Page 7
                                              our technology to transform and improve the performance of
                                              geothermal projects, Ahmad Yani said in his presentation.

                                              Adopting new technologies is one of the strategies PGE offers
                                              to lower development costs so that geothermal projects
                                              become more attractive to investors. Another strategy is the
                                              renewal of the business model and diversification of the
                                              geothermal business to produce products outside of electricity
                                              such as green hydrogen, green ammonia, and silica.

                                              In addition to technology, another breakthrough that PGE has
                                              made is to build a business portfolio through vertical
                                              integration of the geothermal sector, especially in the
                                              manufacturing sector. Together with a number of domestic
                                              partners, PGE is exploring opportunities for manufacturing key
                                              components of geothermal power plants such as heat
                                              exchangers and condensers.

                                              By grasping domestic component production capabilities and
                                              expanding into new businesses outside of electricity, PGE is
                                              not only strengthening its leadership in the geothermal sector
                                              but also laying the foundation to become a geothermal center
                                              of excellence at the global level, Ahmad concluded.
 Impact of event, material information or
 facts towards Issuers or Public
 Company’s operational activities, legal,
 financial condition, or going concern




Thus to be informed accordingly.


Respectfully,
PT Pertamina Geothermal Energy Tbk




Kitty Andhora

Corporate Secretary




PT Pertamina Geothermal Energy Tbk
Grha Pertamina - Tower Pertamax Lt.7
Phone : +62 21 3983 3222, Fax : +62 21 3983 3230, https://www.pge.pertamina.com



Sender Name                          Kitty Andhora

Function                             Corporate Secretary

Date and Time                        20-09-2024 17:08




   This is an official document of PT Pertamina Geothermal Energy Tbk that does not require a signature as it was
      generated electronically by the electronic reporting system. PT Pertamina Geothermal Energy Tbk is fully
                            responsible for the information contained within this document.

File

File Open PDF
Source IDX
Size0.02 MB
Published20 Sep 2024
Pages7
Characters19,296
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 12 people and organisations named in the text · linked when the evidence is strong

linked org Pertamina Geothermal Energy Tbk · Nama Perusahaan p.1 ×42
linked person Eniya Listiani Dewi p.2 ×2
linked person Julfi Hadi p.2 ×6
linked person Ahmad Yani p.2 ×4
possible org PT Pertamina (Persero) p.2 ×2
unresolved org Menteri Energi dan Sumber Daya Mineral Bahlil Lahadalia p.2
unresolved org Menteri BUMN Erick Thohir p.2
unresolved org Menteri ATR p.2
unresolved person Kitty Andhora · Corporate Secretary p.3 ×2
unresolved org Minister of Energy and Mineral Resources Bahlil Lahadalia p.6
unresolved org Minister of State-owned Enterprises Erick Thohir p.6
unresolved org Minister of ATR p.6

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result