PUBLIC EXPOSE
TAHUN 2024

PT KETROSDEN TRIASMITRA, TBK
Page 2
AGENDA PUBLIC EXPOSE


                       UPAYA
           IKHTISAR
                       PENINGKATAN
           KINERJA
                       KINERJA




                       RENCANA
           TARGET
                       PENGEMBANGAN
           KINERJA
                       BISNIS
Page 3
1   IKHTISAR KINERJA
Page 4
PERFORMANSI KEUANGAN



            Pendapatan                        Laba Kotor                       Laba Usaha
                                                            65.746                           42.255
                                               +40%                            +39%
             +33%         117.581

                                     47.109                           30.392
   88.419




  Q1 2023                Q1 2024    Q1 2023                Q1 2024   Q1 2023                Q1 2024
Page 5
PERFORMANSI BISNIS #1
Perusahaan mendapatkan beberapa kontrak baru atas penjualan layanan Perusahaan
kepada pelanggan, baik untuk jaringan kabel darat maupun kabel laut.
    Jakarta-Surabaya Cable System (Jayabaya)               Inner Batam

                                                                         Bemban




New Customers:
                                               New Customers:


            Ultimate Java Backbone               Surabaya – Denpasar Cable System
                     (UJB)                                    (SDCS)




New Customers:                                 New Customers:
Page 6
PERFORMANSI BISNIS #2
Pada tahun 2024, Triasmitra sukses mendapatkan kepercayaan baru dari mitra internasional,
melalui kontrak kerjasama pengamanan kabel laut INDIGO West Cable System, setelah pada
tahun sebelumnya Triasmitra berhasil mendapatkan kepercayaan dari mitra internasional lain
dari Vocus Communications untuk menjaga kabel laut Australia-Singapore Cable (ASC).
Australia-Singapore Cable (ASC) –        INDIGO West Cable System –
Vocus Communications                     Google, Indosat Ooredoo, Singtel, Telstra,
                                         AARNet, APX Partners, SubPartners
Page 7
PERFORMANSI BISNIS #3
Triasmitra dipercaya oleh XL Axiata untuk melakukan Restorasi Kabel Laut Segmen Kuala
Tungkal – Sungai Liat dengan pencapaian Time To Repair selama 16 hari sampai RFS, dimana
waktu tersebut lebih cepat 3 hari dari SLA yang ditetapkan yaitu selama 19 hari.


                                            TIME TO REPAIR                      SLA




                                                 16 hari
                                                                 <            19 hari



                                                      Lebih Cepat 3 Hari dari SLA
Page 8
PERFORMANSI BISNIS #4
Triasmitra bersikap tegas terhadap kejadian putusnya kabel laut yang disebabkan oleh kelalaian
pihak lain seperti Kapal Komersial dan Nelayan, serta menindaklanjuti kejadian tersebut dengan
berlandaskan Perlindungan Hukum untuk kabel laut yang tercantum dalam UU No. 36 Tahun
1999 tentang Telekomunikasi pada Pasal 38




                       01                              02                              03
               Intercept                     Claim Ganti                     Penindakan
                 Kapal                          Rugi                           Hukum
           Triasmitra selalu berupaya dan        Triasmitra berhasil       Triasmitra berhasil melakukan
              berhasil untuk melakukan       melakukan claim ganti rugi     penindakan hukum terhadap
         intercept di tengah laut terhadap   atas kerugian yang dialami    tersangka yang menyebabkan
             pihak yang diduga penjadi       atas terjadinya putus kabel   putusnya kabel laut sampai ke
           penyebab putusnya kabel laut.                 laut.                     ranah hukum.
Page 9
2   UPAYA PENINGKATAN
    KINERJA
Page 10
UPAYA PENINGKATAN KINERJA



               1                                 2                                3
                                      Menjalankan transformasi
                                                                        Meningkatkan pelayanan
   Meningkatkan pendapatan            digital secara menyeluruh
                                                                        kepada pelanggan melalui
 Perusahaan melalui penjualan       dengan tujuan meningkatkan
                                                                        peningkatan keahlian dan
 core jaringan kabel laut / darat   efektivitas dan efisiensi bisnis
                                                                          produktivitas tim serta
     yang sudah beroperasi                Perusahaan, serta
                                                                       optimasi sistem operasi dan
   maupun yang masih dalam           meningkatkan pengendalian
                                                                       pemeliharaan kabel laut dan
      tahap Pembangunan.            dan pengawasan proses bisnis
                                                                               kabel darat.
                                           yang lebih baik.




      PENINGKATAN                          TRANSFORMASI                    PENINGKATAN
 PENDAPATAN PERUSAHAAN                        DIGITAL                  PELAYANAN PELANGGAN
Page 11
3   TARGET KINERJA
Page 12
REVENUE TARGET 2024
                                                 11%                        36%

                                                                                          531

                                                                                          173
                                                               391
                                   353
                                                                                           0
                                                                 161

                                   248                           0
                                                                                          358

                                    2                         230
                                   104

                                   2022                       2023                        2024

                                           Developer     Contractor    Managed Services



          Developer                                    Contractor                                       Managed Services
       121%           56%                        -100%                 -                                -35%          8%

                            358                                                                  248
                                           2

              230                                                                                                          173
                                                                                                               161


104

                                                             0                 0
2022          2023          2024          2022              2023              2024               2022          2023        2024
Page 13
4   RENCANA
    PENGEMBANGAN BISNIS
Page 14
 RENCANA PENGEMBANGAN BISNIS




          1                        2                      3
Proyek Penggelaran SKKL    Proyek Penggelaran      Proyek Konversi
   Jakarta – Singapore    SKKL Indonesia Tengah   Cable Laying Vessel
       (Rising – 8)                                 Bentang Bahari
Page 15
PROYEK PENGGELARAN SKKL RISING - 8


                                       GAMBARAN UMUM                              PROGRESS

  Changi 1A Singapore
                                                                            1. PERMIT
                                                                              •   Surat Rekomendasi Dua
 Tj. Bemban,                         Panjang Kabel 1128.5 km
     Batam                                                                        (Rekom 2) sudah diterbitkan
                                                                                  oleh Pushidrosal (Pusat
                                     Tipe Kabel    NSW SA/DA -R G 654.C           Hidro-Oseanografi Angkatan
                                                                                  Laut)
                                     Teknologi     Kabel Repeatered
                                                                            2. MATERIAL
                                     Kapasitas     25 Tbps per fiber pair     •   Proses Produksi Kabel oleh
                                                                                  Norddeutsche
                                     RFS           Q2- 2025                       Seekabelwerke (NSW) di
                                                                                  Jerman.
                        Tj. Pakis,
                         Jakarta                                              •   Proses Produksi Repeater
                                                                                  oleh Alcatel Submarine
                                                                                  Network (ASN) di Perancis.
Page 16
PROYEK PENGGELARAN SKKL INDONESIA TENGAH

                                                                                          PROGRESS


                                                        LUWUK                 1. PERMIT
                                                      232 km
                                                                               • Audiensi di depan Tim Nasional
                                                      MOROWALI
                                                        251 km                   Pengelolaan Pelaksanaan Alur Pipa
                                                         KENDARI
                                                                                 dan atau Kabel Laut : DONE
                                                                  297 km
                                                                               • Site survey di 10 Lokasi Landing Point
                   MAKASSAR                                        WAKATOBI      dan BMH bersama Timnas : DONE
                                             370 km            219 km


                      274 km
                                        SELAYAR
                                                         BAUBAU                • Surat Rekomendasi 1 dari Timnas
                                    339 km
                                                                                 sebagai panduan untuk Marine
  SANUR   339 km
                 KAWINDA
                   NAE     276 km   LABUAN
                                                                                 Survey : On Process
                                     BAJO
                                                                               • Marine Survey : setelah Surat
                                                                                 Rekomendasi 1 keluar.


           CENTRAL INDONESIA CABLE SYSTEM : 2597 km
Page 17
PROYEK KONVERSI CLV BENTANG BAHARI

1   Kapabilitas Sistem DP-2                                              2       Ramah Lingkungan
    Sistem DP-2 kapal Bentang Bahari memastikan                                  Dengan sistem ballast water yang canggih serta teknik painting
    operasi penggelaran kabel yang tepat, menghilangkan                          dan blasting robotik, Bentang Bahari mengedepankan operasi
    ketergantungan pada faktor eksternal, dan menjamin                           penggelaran kabel yang ramah lingkungan.
    keberhasilan proyek.




    Keunggulan
    Bentang
    Bahari


3   Perangkat Berteknologi Tinggi                 4       Pengoperasian yang Unggul                        5
                                                                                                                  Area Penyambungan Kabel Khusus
    Bentang Bahari dilengkapi dengan peralatan            Kombinasi yang kuat antara tenaga ahli dan              Dilengkapi dengan ruang kerja khusus, Bentang
    penggelaran kabel berteknologi tinggi                 partner pengelola kapal terbaik menjamin                Bahari memastikan operasi penyambungan kabel
    terbaru, yang dirancang untuk meningkatkan            bahwa setiap operasi dijalankan dengan                  yang presisi, mengurangi risiko, dan memastikan
    presisi, kecepatan, dan efisiensi dalam               standar kualitas dan keselamatan tertinggi.             integritas konektivitas.
    penggelaran kabel bawah laut.
Page 18
 TERIMA KASIH




PT Ketrosden Triasmitra, TBK
                     Meta Epsi Building 2nd Floor
             Jl. DI Panjaitan Kav. 2, Rawabunga
                  Jakarta Timur 13350, Indonesia
       Ph +62-21 2208 5100, Fax +62-21 2208 5151
                      Email hq@triasmitra.com

File

File Open PDF
Source IDX
Size1.26 MB
Published24 Jun 2024
Pages18
Characters13,094
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 3 people and organisations named in the text · linked when the evidence is strong

linked org PT KETROSDEN TRIASMITRA p.1 ×3
linked org Meta Epsi p.18
possible — XL Axiata p.7

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

Other files in this announcement 1

↑↓ select ↵ open ⇧↵ see every result