Penghentian Aktivitas Operasional Sementara Terencana Pabrik Amoniak Milik
Perihal
Entitas Anak PT ESSA Industries Indonesia Tbk. (Perseroan).
Dengan ini kami untuk dan atas nama perusahaan menyampaikan Laporan Informasi atau Fakta Material sebagai
berikut:
Nama Emiten atau Perusahaan Publik ESSA Industries Indonesia Tbk
Bidang Usaha Berusaha dalam bidang usaha industri pemurnian dan
pengolahan gas bumi
Telepon +62-21-29885600
Faksimili +62-21-29885601
Alamat Surat Elektronik (email) corpsec.eii@essa.id
Tanggal Kejadian 27 Mei 2024
Jenis Informasi atau Fakta Material Penghentian Aktivitas Operasional Sementara Terencana
Pabrik Amoniak Milik Entitas Anak PT ESSA Industries
Indonesia Tbk. (Perseroan).
Uraian Informasi atau Fakta Material PT ESSA Industries Indonesia Tbk. (atau selanjutnya disebut
Perseroan) bersama ini menginformasikan bahwa Banggai
Ammonia Plant (BAP) yang dioperasikan PT Panca Amara
Utama (anak usaha Perseroan), akan melakukan penghentian
aktivitas operasional sementara terencana atau Pre-scheduled
plant closure yang dijadwalkan pelaksanaannya selama + 1
minggu yang dimulai pada tanggal 27 Mei 2024.
Rencana Pre-scheduled plant closure perlu dilaksanakan
sebagai kegiatan pemeliharaan fasilitas operasi terjadwal yang
dilakukan Perseroan untuk menjaga standar fasilitas operasi
yang optimal, meskipun kegiatan tersebut akan berdampak
pada penurunan produksi amoniak. Hal ini dilakukan sejalan
dengan komitmen Perseroan terhadap operational excellence.
BAP merupakan Pabrik Amoniak paling efisien di dunia yang
menggunakan KBR Reforming Exchanger System & Purifier
Technology, adapun aktivitas ini diperlukan bagi BAP untuk
menjaga kehandalan kinerja dan keunggulan operasional.
Dampak kejadian, informasi atau fakta Terlampir
material tersebut terhadap kegiatan
operasional, hukum, kondisi keuangan,
atau kelangsungan usaha Emiten atau
Perusahaan Publik
Demikian untuk diketahui.
Hormat Kami,
ESSA Industries Indonesia Tbk
Page 2
Shinta Dumasari Utami Siringoringo
Corporate Secretary
ESSA Industries Indonesia Tbk
DBS Bank Tower Lt. 18, Ciputra World 1 Jakarta, Jl. Prof. Dr. Satrio Kav. 3-
Telepon : +62-21-29885600 , Fax : +62-21-29885601 , www.essa.id
Nama Pengirim Shinta Dumasari Utami Siringoringo
Jabatan Corporate Secretary
Tanggal dan Waktu 17-05-2024 16:29
Lampiran 1. Cover Letter Pre-scheduled Plant Closure of BAP.pdf
2. Penghentian Aktivitas Operasional Sementara BAP.pdf
3. BAP Pre-scheduled Plant Closure.pdf
Dokumen ini merupakan dokumen resmi ESSA Industries Indonesia Tbk yang tidak memerlukan tanda tangan
karena dihasilkan secara elektronik oleh sistem pelaporan elektronik. ESSA Industries Indonesia Tbk bertanggung
jawab penuh atas informasi yang tertera didalam dokumen ini.
Page 3
Go To Indonesian Page
Letter / Announcement No. 0120/LT/EII-OJK/2024
Issuer Name ESSA Industries Indonesia Tbk
Issuer Code ESSA
Attachment 3
Subject Pre-scheduled Plant Closure of Ammonia Plant Owned by Subsidiary of PT
ESSA Industries Indonesia Tbk. (Company)
The company hereby announce the Material Information or Facts Report as follows
Name of Issuer or Public Company ESSA Industries Indonesia Tbk
Business Activities Berusaha dalam bidang usaha industri pemurnian dan
pengolahan gas bumi
Telephone +62-21-29885600
Faximile +62-21-29885601
Email Address corpsec.eii@essa.id
Date of Event 27 May 2024
Pre-scheduled Plant Closure of Ammonia Plant Owned by
Type of Material Information or Facts Subsidiary of PT ESSA Industries Indonesia Tbk. (Company)
Description of Material Information or PT ESSA Industries Indonesia Tbk. (hereinafter referred to as
Facts the Company) hereby informs that the Banggai Ammonia Plant
(BAP) operated by PT Panca Amara Utama (a subsidiary of
the Company) will undergo a Pre-scheduled plant closure,
scheduled to take place for + 1 week started from 27 May
2024.
The Pre-scheduled plant closure is conducted as part of the
Company's scheduled maintenance activities to maintain
optimal operational facility standards, even though this activity
will have an impact in the decrease of ammonia production.
Such activity is in line with Company's commitment of
operational excellence.
BAP is recognized as the most efficient Ammonia Plant
globally, leveraging the KBR Reforming Exchanger System &
Purifier Technology. This activity is essential for BAP to uphold
performance reliability and operational excellence.
Impact of event, material information or As attached
facts towards Issuers or Public
Company’s operational activities, legal,
financial condition, or going concern
Thus to be informed accordingly.
Respectfully,
ESSA Industries Indonesia Tbk
Shinta Dumasari Utami Siringoringo
Page 4
Corporate Secretary
ESSA Industries Indonesia Tbk
DBS Bank Tower Lt. 18, Ciputra World 1 Jakarta, Jl. Prof. Dr. Satrio Kav. 3-
Phone : +62-21-29885600 , Fax : +62-21-29885601 , www.essa.id
Sender Name Shinta Dumasari Utami Siringoringo
Function Corporate Secretary
Date and Time 17-05-2024 16:29
Attachment 1. Cover Letter Pre-scheduled Plant Closure of BAP.pdf
2. Penghentian Aktivitas Operasional Sementara BAP.pdf
3. BAP Pre-scheduled Plant Closure.pdf
This is an official document of ESSA Industries Indonesia Tbk that does not require a signature as it was generated
electronically by the electronic reporting system. ESSA Industries Indonesia Tbk is fully responsible for the
information contained within this document.
Names mentioned 8 people and organisations named in the text · linked when the evidence is strong
unresolved
org
Industries Indonesia Tbk
p.1 ×16
unresolved
org
PT Panca Amara Utama
p.1 ×2
unresolved
org
Utami Siringoringo
p.2
unresolved
—
Shinta Dumasari Utami Siringoringo
· Corporate Secretary
p.2 ×2
unresolved
org
Corporate Secretary ESSA Industries Indonesia Tbk
p.4
Extraction attempts how the parser did, and what it refused
Nothing structured was extracted from this document — the attempts below say why.
No extraction attempted yet.