Back to announcement
20240517_ESSA_Laporan Informasi dan Fakta Material_31640499_lamp3.pdf
Other Text extracted ESSASource file signed link, expires in 15 minutes
Extracted text 1
Page 1
DISCLOSURE OF INFORMATION
PT ESSA Industries Indonesia Tbk. (hereinafter referred to as the "Company") hereby informs that the
Banggai Ammonia Plant (BAP) operated by PT Panca Amara Utama (a subsidiary of the Company) will
undergo a Pre-scheduled plant closure, scheduled to take place for + 1 week started from 27 May
2024.
The Pre-scheduled plant closure is conducted as part of the Company's scheduled maintenance
activities to maintain optimal operational facility standards, even though this activity will have an impact
in the decrease of ammonia production. Such activity is in line with Company's commitment of
operational excellence.
BAP is recognized as the most efficient Ammonia Plant globally, leveraging the KBR Reforming
Exchanger System & Purifier Technology. This activity is essential for BAP to uphold performance
reliability and operational excellence.
For further information, please visit our website at www.essa.id or contact:
Shinta D. U. Siringoringo
Corporate Secretary
T : +62 21 2988 5600
E : corpsec.eii@essa.id
PT ESSA Industries Indonesia Tbk.
DBS Bank Tower 18th Floor T +62 21 2988 5600
Jl. Prof. Dr. Satrio Kav. 3-5 F +62 21 2988 5601
Jakarta 12940, Indonesia www.essa.id Hal 1/1
Names mentioned 5 people and organisations named in the text · linked when the evidence is strong
unresolved
org
Industries Indonesia Tbk.
p.1 ×2
unresolved
org
PT Panca Amara Utama
p.1
Extraction attempts how the parser did, and what it refused
Nothing structured was extracted from this document — the attempts below say why.
No extraction attempted yet.