Skip to content
Back to announcement

Final Report Reviu Interim PT WIKA 30 Juni 2026_.pdf

Financial statement Text extracted WIKA

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 176

Page 1
PT WIJAYA KARYA (PERSERO) TBK
LAPORAN KEUANGAN KONSOLIDASIAN INTERIM
INTERIM CONSOLIDATED FINANCIAL STATEMENTS
                            TANGGAL 30 JUNI 2026 DAN 31 DESEMBER 2025
                                      AS OF JUNE 30, 2026 AND DECEMBER 31, 2025
                      DAN UNTUK PERIODE 6 (ENAM) BULAN YANG BERAKHIR
                                   AND FOR THE PERIOD OF 6 (SIX) MONTHS ENDED
                                    PADA TANGGAL 30 JUNI 2026 DAN 2025
                                                   AS OF JUNE 30, 2026 AND 2025

Page 2
PT WIJAYA KARYA (PERSERO) Tbk          PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                    AND SUBSIDIARIES

Laporan Keuangan Konsolidasian            Consolidated Financial Statements
Untuk Tahun-tahun yang Berakhir pada                   For the Years Ended
tanggal 30 Juni 2026 dan 2025                        June 30, 2026 and 2025

Page 3
PT WIJAYA KARYA (PERSERO) Tbk                                      PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                AND SUBSIDIARIES




Daftar Isi                                         Halaman/                             Table of Contents
                                                    Pages


Surat Pernyataan Direksi                                                     Directors’ Statement Letter

Laporan Keuangan Konsolidasian                                      Consolidated Financial Statements
Untuk Tahun-tahun yang Berakhir pada                                             For the Years Ended
Tanggal 30 Juni 2026 dan 2025                                                  June 30, 2026 and 2025

  Laporan Posisi Keuangan Konsolidasian               1       Consolidated Statements of Financial Position

  Laporan Laba Rugi dan Penghasilan Komprehensif      3       Consolidated Statements of Profit or Loss and
  Lain Konsolidasian                                                         Other Comprehensive Income

  Laporan Perubahan Ekuitas Konsolidasian             4       Consolidated Statements of Changes in Equity

  Laporan Arus Kas Konsolidasian                      5             Consolidated Statements of Cash Flows

  Catatan atas Laporan Keuangan Konsolidasian         6         Notes to Consolidated Financial Statements

Page 4

Page 5

Page 6
                                                                                                                           An Independent Member of




                                                                                                                           AMERICA EUROPE ARIA AEHICA OCEANIA
                                                                                                                                 www.u<.c»flobal.orn




            LAPORAN ATAS REVIU INFORMASI KEUANGAN                           REPORT ON REVIEW OF INTERIM FINANCIAL
            INTERIM                                                         INFORMATION

             No. 00008/2. 1061 /SPR 2410/03/1080-1/1 /VI11/2026             No. 00008/2 1061/SPR. 2410/03/1080- 1/1/VIII/2026

             Pemegang Saham, Komisaris dan Direktur                         Shareholders, the Board of Commissioners and
                                                                            Board of Directors

             PT Wijaya Karya (Persero), Tbk dan Entitas Anak                PT Wijaya Karya (Persero), Tbk and Subsidiaries



             Pendahuluan                                                    Introduction

             Kami telah mereviu laporan keuangan konsolidasian              We have reviewed the accompanying intenm
             interim PT Wijaya Karya (Persero) Tbk dan Entitas              consolidated financial statements of PT Wijaya Karya
             Anak terlampir, yang terdiri dari laporan posisi               (Persero) Tbk and Subsidiaries, which comprise the
             keuangan konsolidasian interim tanggal 30 Juni 2026.           interim consolidated statement of financial position as
             serta laporan laba rugi dan penghasilan komprehensif           of June 30, 2026, and the interim consolidated
             lain, laporan perubahan ekuitas, dan laporan arus kas          statements of profit or loss and other comprehensive
             konsolidasian interim untuk periode enam bulan yang            income, changes in equity, and cash flows for the six-
             berakhir pada tanggal tersebut, serta catatan atas             month period then ended, and notes to the interim
             laporan keuangan konsolidasian interim, termasuk               consolidated financial statements, including matenal
             informasi kebijakan akuntansi material dan informasi           accounting policy information and other explanatory
             penjelasan lainnya Manajemen bertanggung jawab                 information. Management is responsible for the
             atas penyusunan dan penyajian wajar laporan                    preparation and fair presentation of these interim
             keuangan konsolidasian interim tersebut sesuai                 consolidated financial statements in accordance with
             dengan Standar Akuntansi Keuangan di Indonesia.                Indonesian Financial Accounting Standards Our
             Tanggung jawab kami adalah untuk menyatakan suatu              responsibility is to express a conclusion on these
             kesimpulan atas laporan keuangan konsolidasian                 interim consolidated financial statements based on our
             interim tersebut berdasarkan reviu kami.                       review.

             Ruang Lingkup Reviu                                            Scope of review

             Kami melaksanakan reviu berdasarkan Standar                    We conducted our review in accordance with Review
             Perikatan Reviu (SPR) 2410 (Revisi 2023), "Reviu atas          Engagements Standard (SPR) 2410 (Revised 2023),
             Informasi Keuangan Interim yang Dilaksanakan oleh              "Review of Interim Financial Information Performed by
             Auditor Independen Entitas", yang ditetapkan oleh              the Independent Auditor of the Entity," issued by the
             Institut Akuntan Publik Indonesia. Suatu reviu atas            Indonesian Institute of Certified Public Accountants A
             informasi keuangan interim terdiri dari permintaan             review of interim financial information consists of
             keterangan, terutama kepada pihak yang bertanggung             making inquiries, primarily of persons responsible for
             jawab atas bidang keuangan dan akuntansi. serta                financial and accounting matters, and applying
             penerapan prosedur analitis dan prosedur reviu                 analytical and other review procedures. A review is
             lainnya Suatu reviu memiliki ruang lingkup yang                substantially less in scope than an audit conducted in
             secara substansial lebih sempit dibandingkan dengan            accordance with Auditing Standards issued by the
             audit yang dilaksanakan sesuai dengan Standar Audit            Indonesian Institute of Certified Public Accountants
             yang ditetapkan oleh Institut Akuntan Publik Indonesia         and, consequently, does not enable us to obtain
             dan, sebagai konsekuensinya, tidak memungkinkan                assurance that we would become aware of all
             kami untuk memperoleh keyakinan bahwa kami akan                significant matters that might be identified in an audit
             mengetahui seluruh hal signifikan yang mungkin                 Accordingly, we do not express an audit opinion
             teridentifikasi dalam suatu audit. Oleh karena itu, kami
             tidak menyatakan suatu opini audit.




Slamet Riyanto, Aryanto & Rekan
Registered Public Accountants                                                                                      Independent Affiliated of
Fatmawatl Festival Blok B 11 - Jl. RS Fatmawati No. 50 , Jakarta 12430                                          UC&CS AMERICA
Phone : +62 21 751 4054 I Fax : +62 21 - 751 4054 I Email: office@kapslr.
www. kapslr.co.id
License No : 227 / KM.1 / 2016
                                                                                                        O          www.ucc8-america.orR
                                                                                                            Accounting Legal and Business Advisors
                                                                                                                     A Strategic Alliance
                                                                                                                     New York Mexico

Page 7
LAPORAN ATAS REVIU INFORMASI KEUANGAN                          REPORT ON REVIEW OF INTERIM FINANCIAL
INTERIM                                                        INFORMATION



Kesimpulan                                                     Conclusion

Berdasarkan reviu kami, tidak ada hal yang menjadi             Based on our review, nothing has come to our
perhatian kami yang menyebabkan kami yakin bahwa               attention that causes us to believe that the
laporan keuangan konsolidasian interim terlampir tidak         accompanying     interim   consolidated     financial
menyajikan secara wajar, dalam semua hal yang                  statements do not present fairly, in all material
material, posisi keuangan konsolidasian PT Wijaya              respects, the consolidated financial position of PT
Karya (Persero) Tbk dan Entitas Anak tanggal 30 Juni           Wijaya Karya (Persero) Tbk and Subsidiaries as of
2026, serta kinerja keuangan dan arus kas                      June 30, 2026, and their consolidated financial
konsolidasian untuk periode enam bulan yang berakhir           perfomiance and consolidated cash flows for the six-
pada tanggal tersebut, sesuai dengan Standar                   month period then ended, in accordance with
Akuntansi Keuangan di Indonesia.                               Indonesian Financial Accounting Standards




Kantor Akuntan Publik I Public Accounting Firm
Slamet Riyanto, Aryanto & Rekan




Slamet Riyanto, CA., CPA
Nornor Izln Akuntan Publik AP 1080 / License of Public Accountant NoAP 1080

27 Agustus 2026/August 27, 2026




                                                              An Independent Member of                    Independent Affiliated of
                                                                                                       UC&CS AMERICA

                                                              AMERICA CUROPC ASIA AFRICA OCEANIA
                                                                    www.uccAglobal.org
                                                                                                   O      www.uccs-america.org
                                                                                                   accounting I.cgal and Business Advisors
                                                                                                            A Strategic Alliance
                                                                                                            New York Mexico

Page 8
PT WIJAYA KARYA (PERSERO) Tbk                                                                                             PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                                                      AND ITS SUBSIDIARIES
LAPORAN POSISI KEUANGAN KONSOLIDASIAN                                                                CONSOLIDATED STATEMENT OF FINANCIAL POSITION
Untuk periode Enam Bulan yang berakhir 30 Juni 2026 dan 31 Desember 2025                  For the period Six-Month, ended June 30, 2026 and December 31, 2025
(Disajikan dalam ribuan Rupiah, kecuali dinyatakan lain)                                                 (Expressed in thousand Rupiah, unless otherwise stated)

                                                                   30 Juni / June 30,     31 Des / Dec 31,
                                                   Catatan /
                                                                         2026                  2025
                                                    Notes
ASET                                                                                                                                                   ASSETS
ASET LANCAR                                                                                                                                CURRENT ASSETS
Kas dan Setara Kas                                4, 50, 52, 54       1.933.204.280         2.754.958.146                            Cash and Cash Equivalent
Bank Dibatasi Penggunaannya                         5, 52, 54            27.972.447           450.121.356                                       Restricted Bank
Piutang Usaha - Neto                                6, 52, 54                                                                          Trade Receivables - Net
    Pihak Berelasi                                     52               651.540.049           727.302.239                                   Related Parties
    Pihak Ketiga                                                        997.146.200           832.058.727                                      Third Parties
Piutang Retensi - Neto                              7, 52, 54                                                                       Retention Receivables - Net
    Pihak Berelasi                                     52               374.657.125           265.066.642                                   Related Parties
    Pihak Ketiga                                                        387.502.703           497.279.587                                      Third Parties
Tagihan Bruto Pemberi Kerja - Neto                  8, 52, 54                                                                         Due From Customer -Net
    Pihak Berelasi                                     52               755.341.535           684.538.805                                   Related Parties
    Pihak Ketiga                                                      2.165.250.565           806.419.040                                      Third Parties
Piutang yang belum ditagih                           9, 54              561.594.661           490.733.477                                      Accrued Income
Piutang Lain-Lain - Neto                           10, 52, 54                                                                          Other Receivables - Net
    Pihak Berelasi                                     52               211.921.937           251.718.957                                      Third Parties
    Pihak Ketiga                                                         11.184.794            27.680.472                                   Related Parties
Persediaan                                             11             7.877.129.188         7.653.492.592                                            Inventories
Uang Muka                                              12               233.624.881           268.656.391                                              Advance
Pajak Dibayar Dimuka                                  29.a            1.057.289.500         1.250.728.187                                           Prepaid Tax
Biaya Dibayar Dimuka                                   13               562.271.600           508.264.783                                     Prepaid Expense
Jaminan Usaha                                        14, 55             129.942.736           115.831.537                                  Business Guarantee
Pekerjaan dalam Proses                               15, 52                                                                                 Working in Progress
    Pihak Berelasi                                     52               533.559.701           498.325.414                                   Related Parties
    Pihak Ketiga                                                      1.112.202.638         1.668.245.828                                      Third Parties
Aset Lancar Lain-lain                               25.a, 54            320.211.670           314.506.866                                  Other Current Assets
Jumlah Aset Lancar                                                  19.903.548.210         20.065.929.046                                 Total Current Assets

ASET TIDAK LANCAR                                                                                                                    NON-CURRENT ASSETS
Aset Real Estate                                                                                                                             Real Estate Assets
    Tanah Belum Dikembangkan                           16            1.467.577.525          1.449.371.356                           Land For Development
Investasi Pada Entitas Asosiasi                        17            2.439.289.393          2.495.673.833                             Investment in Associates
Investasi Pada Ventura Bersama                        18a            7.194.399.632          8.076.686.612                           Investment in Joint Venture
Properti Investasi                                     19            1.461.886.751          1.529.137.751                                  Investment Property
Aset Tetap                                             20            4.990.877.244          5.043.063.233                                          Fixed Assets
Aset Kerja Sama Operasi                                21              239.815.055            245.911.142                                Joint Operation Assets
Goodwill                                               22                4.847.052              4.847.052                                               Goodwill
Investasi Jangka Panjang Lainnya                     23, 54          1.039.409.327          1.024.409.327                         Other Long Term Investments
Aset Takberwujud                                       24            9.526.731.422          9.337.897.273                                      Intangible Assets
Aset Pajak Tangguhan                                  29.e              31.354.041             25.194.732                                  Deferred Tax Assets
Aset Tidak Lancar Lain-Lain                         25.b, 54           646.318.284            848.964.337                            Other Non-Current Assets
  Jumlah Aset Tidak Lancar                                          29.042.505.726         30.081.156.648                         Total Non-Current Assets
JUMLAH ASET                                                         48.946.053.936         50.147.085.694                                      TOTAL ASSETS

Lihat catatan atas Laporan Keuangan Konsolidasian yang merupakan bagian yang tidak      See the accompanying Notes to the consolidated Financial Statements
terpisahkan dari laporan keuangan secara keseluruhan.                                   which are an integral part of the financial statements as a whole




                                                                                1

Page 9
PT WIJAYA KARYA (PERSERO) Tbk                                                                                             PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                                                      AND ITS SUBSIDIARIES
LAPORAN POSISI KEUANGAN KONSOLIDASIAN 0                                                              CONSOLIDATED STATEMENT OF FINANCIAL POSITION
Untuk periode Enam Bulan yang berakhir 30 Juni 2026 dan 31 Desember 2025                  For the period Six-Month, ended June 30, 2026 and December 31, 2025
(Disajikan dalam ribuan Rupiah, kecuali dinyatakan lain)                                                 (Expressed in thousand Rupiah, unless otherwise stated)

                                                    Catatan /      30 Juni / June 30,     31 Des / Dec 31,
                                                     Notes               2026                  2025
LIABILITAS DAN EKUITAS                                                                                                              LIABILITIES AND EQUITY
LIABILITAS JANGKA PENDEK                                                                                                               CURRENT LIABILITIES
Pinjaman Jangka Pendek                             26, 52, 54                                                                                  Short Term Loans
     Pihak Berelasi                                    52                66.145.046            83.055.267                                    Related Parties
     Pihak Ketiga                                                       158.617.057           158.617.057                                       Third Parties
Utang Usaha                                        27, 52, 54                                                                                     Trade Payables
     Pihak Berelasi                                    52               687.509.462           635.520.109                                    Related Parties
     Pihak Ketiga                                                     3.634.121.835         3.631.714.856                                       Third Parties
Utang Lain-Lain Jangka Pendek                      28, 52, 54                                                                    Other Payables current portion
     Pihak Berelasi                                    52               798.588.244           773.119.503                                    Related Parties
     Pihak Ketiga                                                       296.490.156           260.201.515                                       Third Parties
Utang Pajak                                           29.b              307.525.710           363.225.717                                           Tax Payables
Uang Muka Dari Pelanggan                               30             1.019.652.833           945.292.390                             Advance From Customers
Beban Akrual                                         31, 54           5.186.996.841         5.028.917.894                                     Accrued Expenses
Pendapatan Diterima Dimuka                             32               144.168.363           107.007.944                                    Unearned Revenue
Bag.jangka pendek dari jangka panjang:                                                                                        Current portion of Long Term Loan
     Pinjaman Jangka Menengah                        33, 54             67.500.000             80.000.000                                Medium Term Loan
     Pinjaman Jangka Panjang                       37, 52, 54          261.797.051            879.709.992                                   Long Term Loan
     Liabilitas Sewa                                 36, 54                    -               10.815.282                                    Lease Liabilities
     Obligasi                                       38.a, 54           197.000.000          1.437.500.000                                               Bond
     Sukuk Mudharabah                               38.b, 54            91.500.000          1.118.625.000                                              Sukuk
  Jumlah Liabilitas Jangka Pendek                                   12.917.612.598         15.513.322.526                             Total Current Liablities

LIABILITAS JANGKA PANJANG                                                                                                          NON-CURRENT LIABILITIES
Liabilitas Imbalan Paska Kerja                         34               332.273.528           334.963.303                            Employee Benefits Liabilities
Liabilitas Pajak Tangguhan                            29.e              119.124.948           109.637.110                                  Deferred Tax Liabilities
Uang Muka Dari Pelanggan                               30               172.470.991           202.741.246                              Advance From Customers
Uang Muka Proyek                                       35               840.532.471           511.863.044                       Advances for Long Term Projects
Utang Lain-lain                                      28, 54                                                                   Other Payables non current portion
    Pihak Berelasi                                     52                17.869.102            21.599.215                                      Related Parties
    Pihak Ketiga                                                      2.235.001.674         1.805.708.780                                         Third Parties
Bagian jangka panjang setelah dikurangi                                                                                       Current portion of Long Term Loan
  bagian jangka pendek                                                                                                   after net of current portion short Term
    Pinjaman Jangka Menengah                         33, 54          1.545.000.000          1.545.000.000                                 Medium Term Loan
    Pinjaman Jangka Panjang                        37, 52, 54       20.375.454.785         20.439.596.860                                     Long Term Loan
    Liabilitas Sewa                                  36, 54              3.605.782                251.095                                     Lease Liabilities
Utang Ventura Bersama                                 18.b             282.670.515            274.332.019                                  Joint Venture Payables
Obligasi                                            38.a, 54         7.793.466.910          6.549.061.991                                                     Bond
Sukuk Mudharabah                                    38.b, 54         2.180.815.000          1.153.690.000                                      Sukuk Mudharabah
  Jumlah Liabilitas Jangka Panjang                                  35.898.285.706         32.948.444.663                        Total Non-Current Liablities
JUMLAH LIABILITAS                                                   48.815.898.303         48.461.767.189                                   TOTAL LIABILITIES

EKUITAS                                                                                                                                               EQUITY
Ekuitas yang dapat diatribusikan kepada                                                                                Equity attributable to owners of parent
pemilik entitas induk                                                                                                  entity
Modal Saham                                                                                                                                      Share Capital
 Modal Dasar 150.000.000.000 saham,                                                                                    Authorized Capital 150,000,000,000
 nilai nominal Rp100 (Rupiah penuh) per                                                                                shares, par value of Rp100 (full
 saham. Modal ditempatkan dan disetor                                                                                  amount) per share. Issued and paid up
 sejumlah 39.873.063.858 saham per 30                                                                                  capital are 39,873.063.858 shares in
 Juni 2026 dan 31 Desember 2025.                                                                                       June 30, 2026 and December 31, 2025.

                                                       39             3.987.306.386         3.987.306.386
Modal Saham Diperoleh Kembali                          40                  (110.000)             (110.000)                                        Treasury stock
Tambahan Modal Disetor                                 41             9.040.356.181         9.040.356.181                              Additional Paid-in Capital
Perubahan ekuitas pada                                                                                                                      Changes in Equity of
  Entitas Anak                                                        1.002.833.696         1.002.833.696                                 Subsidiary Company
Saldo Laba (Defisit)                                                                                                                  Retained Earnings (Deficit)
  Saldo Laba yang Telah Ditentukan
    Penggunaannya                                                       335.759.957           335.759.957                       Appropriated Retained Earnings
  Defisit                                                           (20.774.609.112)      (19.292.344.749)                                            Deficit
  Cadangan Lainnya                                                    4.041.487.282         4.041.487.282                                     Other Reserves
  Sub Jumlah                                                         (2.366.975.610)         (884.711.247)                                         Sub Total
Kepentingan Non Pengendali                             43             2.497.131.243         2.570.029.752                              Non Controlling Interest
Total Ekuitas                                                          130.155.633          1.685.318.505                                       Total Equity
JUMLAH LIABILITAS DAN EKUITAS                                       48.946.053.936         50.147.085.694                    TOTAL LIABILITIES AND EQUITY

Lihat catatan atas Laporan Keuangan Konsolidasian yang merupakan bagian yang tidak      See the accompanying Notes to the consolidated Financial Statements
terpisahkan dari laporan keuangan secara keseluruhan.                                   which are an integral part of the financial statements as a whole.




                                                                                2

Page 10
PT WIJAYA KARYA (PERSERO) Tbk                                                                                                  PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                                                          AND ITS SUBSIDIARIES
LAPORAN LABA RUGI DAN PENGHASILAN KOMPREHENSIF LAIN                                                 INCOME STATEMENT AND OTHER COMPREHENSIVE INCOME
Untuk periode Enam Bulan yang berakhir 30 Juni 2026 dan 2025                                                 For the period Six-Month ended June 30, 2026 dan 2025
(Disajikan dalam ribuan Rupiah, kecuali dinyatakan lain)                                                    (Expressed in thousand Rupiah, unless otherwise stated)

                                                  Catatan /                    30 Juni / June 30,
                                                   Notes              2026                           2025

PENDAPATAN BERSIH                                     44            6.279.403.455                5.858.183.995                                         NET REVENUES
BEBAN POKOK PENDAPATAN                                45           (5.393.071.123)              (5.385.624.749)                                     COST OF REVENUES
LABA KOTOR                                                            886.332.332                  472.559.246                                          GROSS PROFIT

BEBAN USAHA                                                                                                                                   OPERATING EXPENSES
Beban Penjualan                                       46               (5.971.091)                    (6.417.310)                                     Selling Expenses
Beban Umum dan Administrasi                           47             (573.479.591)                  (509.318.456)                   General and Administrative Expenses
Pendapatan Lain-lain                                  48              161.598.861                    891.365.180                                           Other Income
Beban Lain-lain                                       48             (153.825.005)                  (714.915.197)                                       Other Expenses
LABA (RUGI) USAHA                                                     314.655.506                    133.273.463                          OPERATING PROFIT (LOSS)

PENDAPATAN (BEBAN) LAIN-LAIN                                                                                                                OTHER INCOME (EXPENSE)
Beban Keuangan                                        49           (1.313.246.812)              (1.389.528.772)                                                Finance Cost
Beban Pajak Penghasilan Final                                        (118.196.337)                (109.556.405)                                Final Income Tax Expenses
Bagian Laba (Rugi) Entitas Asosiasi                   17              (51.864.982)                 (84.501.418)                               Gain (loss) Associated Entity
Bagian Laba (Rugi) Entitas Ventura Bersama            18              328.051.267                  298.862.108                             Share in profit of Joint Venturer
Bagian Laba (Rugi) Pengendalian Bersama                              (721.407.031)                (542.310.879)                              Share in profit of Joint Control
Selisih Nilai Wajar Aset Keuangan Lainnya                              15.000.000                          -                            Fair Value difference Other Assets
Jumlah Pendapatan (Beban) Lain-Lain                                (1.861.663.895)              (1.827.035.366)                              Total Other Income (Expense)
LABA (RUGI) SEBELUM PAJAK
  PENGHASILAN                                                      (1.547.008.389)              (1.693.761.903)                 PROFIT (LOSS) BEFORE INCOME TAX

Beban Pajak Penghasilan                              29.c              (6.550.837)                   (14.112.614)                                    Income Tax Expenses

LABA (RUGI) BERSIH                                                 (1.553.559.226)              (1.707.874.517)                                              NET INCOME

PENDAPATAN KOMPREHENSIF LAIN                                                                                                         OTHER COMPREHENSIVE INCOME
  SETELAH PAJAK                                                                                                                                                AFTER TAX
Pendapatan (beban) komprehensif lainnya yang                                                                                             Other Comprehensive Income that
  tidak direklasifikasi ke laba rugi :                                                                                will not be reclassified Subsequently to profit or loss
     Selisih Penilaian Aset                                                                                                                    Difference of Asset Valuation
     Keuntungan (Kerugian) aktuarial Atas                                                                                                  Actuarial Gain (Loss) of Defined
       Program Imbal kerja Pasti                                                  -                            -                                                Benefit Plan
     Pajak PenghasilanTerkait Pos yang Tidak                                                                                            Income Tax Related to Item that will
       akan direklasifikasi ke Laba Rugi                                          -                            -
JUMLAH PENDAPATAN KOMPREHENSIF                                                                                                      OTHER COMPREHENSIVE INCOME
  PERIODE BERJALAN                                                 (1.553.559.226)              (1.707.874.517)                                 FOR THE PERIOD

LABA YANG DAPAT DIATRIBUSIKAN KE :                                                                                                       INCOME ATTRIBUTABLE TO :
- PEMILIK ENTITAS INDUK                                            (1.482.264.363)              (1.663.281.360)                              PARENT ENTITY OWNER -
- KEPENTINGAN NON PENGENDALI                          43              (71.294.863)                 (44.593.157)                         NON CONTROLLING INTEREST -
   JUMLAH                                                          (1.553.559.226)              (1.707.874.517)                                             TOTAL

JUMLAH LABA (RUGI) KOMPREHENSIF YANG                                                                                               TOTAL COMPREHENSIVE INCOME
DAPAT DIATRIBUSIKAN KEPADA :                                                                                                                  ATTRIBUTABLE TO :
- PEMILIK ENTITAS INDUK                                            (1.482.264.363)              (1.663.281.360)                            PARENT ENTITY OWNER -
- KEPENTINGAN NON PENGENDALI                          43              (71.294.863)                 (44.593.157)                       NON CONTROLLING INTEREST -
   JUMLAH                                                          (1.553.559.226)              (1.707.874.517)                                           TOTAL

Laba Bersih Per Saham Dasar                           42                     (37,17)                        (41,71)                                Net Earning Per Share


Lihat catatan atas Laporan Keuangan Konsolidasian yang merupakan bagian yang tidak         See the accompanying Notes to the consolidated Financial Statements
terpisahkan dari laporan keuangan secara keseluruhan.                                      which are an integral part of the financial statements as a whole.




                                                                              3

Page 11
PT WIJAYA KARYA (PERSERO) Tbk DAN ENTITAS ANAK                                                                                                                                                                                                             PT WIJAYA KARYA (PERSERO) Tbk AND ITS SUBSIDIARIES
LAPORAN PERUBAHAN EKUITAS KONSOLIDASIAN                                                                                                                                                                                                                       CONSOLIDATED STATEMENT OF CHANGES IN EQUITIES
Untuk periode Enam Bulan yang berakhir 30 Juni 2026 dan 2025                                                                                                                                                                                                       For the period Six-Month ended June 30, 2026 dan 2025
(Disajikan dalam ribuan Rupiah, kecuali dinyatakan lain)                                                                                                                                                                                                          (Expressed in thousand Rupiah, unless otherwise stated)
                                                                                                                                                            Saldo Laba / Retained Earning
                                                  Modal Ditempatkan    Modal Saham             Tambahan Modal          Perubahan Ekuitas
                                                                                                                                                                                     Saldo Laba yang             Jumlah /
                                                    dan Disetor/    Diperoleh Kembali /           Disetor /            Pada Entitas Anak /      Cadangan            Cadangan                                                       Kepentingan Non
                                                                                                                                                                                     belum ditentukan                                                  Total Ekuitas / Total
                                                                                                                                                 Lainnya/           Bertujuan/                                                     Pengendali/ Non
                                                                                                                                                                                      penggunaanya/                                                           Equity
                                                                                                                                                                                                                                  Controlling Interest
                                                    Issued and Paid                            Additional Paid-in                                                                     Unappropriated
                                                                         Treasury Stock                                Changes in Equity      Others Reserve    General Reserve                                    Total
                                                       Up Capital                                   Capital                                                                          Retained Earning
                                                                                                                       of Subsidiary Entity
           0
SALDO PER 1 JANUARI 2025                               3.987.306.386             (110.000)          9.040.356.181          1.003.022.211        4.041.487.282        335.759.957         (9.539.141.220)        8.868.680.797          3.002.738.995        11.871.419.792                  BALANCE AS OF JANUARY 1, 2025

Rugi Neto Tahun Berjalan                                         -                    -                       -                      -                    -                  -            (780.175.750)          (780.175.750)            (3.189.117)         (783.364.867)                       Net Loss for the Current Year
SALDO PER 30 JUNI 2025                                 3.987.306.386             (110.000)          9.040.356.181          1.003.022.211        4.041.487.282        335.759.957       (10.319.316.970)         8.088.505.047          2.999.549.878        11.088.054.925                      BALANCE AS OF JUNE 30, 2025


SALDO PER 1 JANUARI 2026                               3.987.306.386             (110.000)          9.040.356.181          1.002.833.696        4.041.487.282        335.759.957       (19.292.344.749)          (884.711.247)         2.570.029.752          1.685.318.505                 BALANCE AS OF JANUARY 1, 2026

Dividen                                                          -                    -                       -                      -                    -                  -                     -                      -               (1.603.646)            (1.603.646)                                         Dividends
Rugi Neto Tahun Berjalan                                         -                    -                       -                      -                    -                  -          (1.482.264.363)        (1.482.264.363)           (71.294.863)        (1.553.559.226)                      Net Loss for the Current Year
SALDO PER 30 JUNI 2026                                 3.987.306.386             (110.000)          9.040.356.181          1.002.833.696        4.041.487.282        335.759.957       (20.774.609.112)        (2.366.975.610)         2.497.131.243            130.155.633                     BALANCE AS OF JUNE 30, 2026

Lihat catatan atas Laporan Keuangan Konsolidasian yang merupakan bagian yang tidak terpisahkan dari laporan keuangan                                                                See the accompanying Notes to Consolidated Financial Statements which are an integral part of the financial statements as a whole.
secara keseluruhan.

Page 12
PT WIJAYA KARYA (PERSERO) Tbk                                                                                           PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                                                   AND ITS SUBSIDIARIES
LAPORAN ARUS KAS KONSOLIDASIAN                                                                              CONSOLIDATED STATEMENT OF CASH FLOW
Untuk periode Enam Bulan yang berakhir 30 Juni 2026 dan 2025                                          For the period Six-Month ended June 30, 2026 dan 2025
(Disajikan dalam ribuan Rupiah, kecuali dinyatakan lain)                                              (Expressed in thousand Rupiah, unless otherwise stated)

                                                                     30 Juni / June 30,
                                                                  2026                2025
ARUS KAS DARI AKTIVITAS OPERASI                                                                              CASH FLOWS FROM OPERATING ACTIVITIES
Penerimaan Kas dari Pelanggan                                   5.268.503.498      5.849.256.702                              Received from Customers
Pembayaran Kepada Pemasok                                      (4.633.097.159)    (5.673.690.188)                                  Payment to Suppliers
Pembayaran Kepada Direksi dan Karyawan                           (739.208.352)      (804.988.816)                     Payment for Director and Employee
Pembayaran Pajak-Pajak                                           (503.854.673)      (424.935.208)                                      Payment of Taxes
Penerimaan Restitusi Pajak                                         74.268.273                -                                          Receipt of Taxes
Kas Bersih Diperoleh dari (Digunakan                                                                                   Net Cash Provided by (Used for)
    untuk) Aktivitas Operasi                                    (533.388.414)     (1.054.357.510)                                      Operation Activities 0

ARUS KAS DARI AKTIVITAS INVESTASI                                                                             CASH FLOWS FROM INVESTING ACTIVITIES
Penambahan Aset Takberwujud                                     (184.129.527)       (173.328.413)                             Additions in Intangible Assets
Penambahan Jaminan Usaha                                         (28.861.504)         (1.550.487)                  Decrease (Increase) Business Guarantee
Pengurangan (Penambahan) Dana yang dibatasi                                                                            Deduction (Additional) Disbursement
  penggunaannya                                                  478.976.385         809.601.259                                           of restricted fund
Pembelian Aset Tetap                                               (3.825.948)            (5.834.345)                              Acquisition of Fixed Assets
Penjualan Aset Tetap                                                 639.491           6.473.322                                    Disposal of Fixed Assets
Pengembalian Pinjaman dari Entitas Asosiasi                              -            30.000.000              Receipt of Payment from Investment Associates
Pengembalian (Penambahan) Investasi Ventura Bersama              587.181.647         818.546.214             Return (Additional) of Investment in Joint Venture
Penurunan (Penambahan) Aset lain-lain                              1.682.339               (854.707)                     Decrease (Increase) in Other Assets
Penerimaan Bunga                                                  12.247.720          37.004.938                                             Interest Received
Penurunan (Kenaikan) Investasi Lainnya                             (1.150.019)               28.565                  Decrease (Increase) in Other Investment
Kas Bersih Diperoleh dari (Digunakan                                                                                      Net Cash Provided by (Used for)
  untuk) Aktivitas Investasi                                     862.760.584       1.520.086.346                                        Investing Activities

ARUS KAS DARI AKTIVITAS PENDANAAN                                                                             CASH FLOWS FROM FINANCING ACTIVITIES
Pinjaman Bank Jangka Pendek                                                                                                   Short Term Bank Loans
  Penerimaan Pinjaman                                             97.526.055          10.008.353                                  Received From Bank Loans
  Pembayaran Pinjaman                                           (133.876.237)       (341.227.471)                                     Payment of Bank Loans
Pinjaman Bank Jangka Menengah                                                                                                            Medium Term Notes
  Penerimaan (Pembayaran) Pinjaman                               (12.500.000)        (12.500.000)                                 Received From Bank Loans
  Pembayaran Pinjaman                                                                            -                                   Payment of Bank Loans
Pinjaman Bank Jangka Panjang                                                                                                         Long Term Bank Loans
  Penerimaan Pinjaman                                             30.751.234                     -                                Received From Bank Loans
  Pembayaran Pinjaman                                           (946.034.443)     (1.117.718.079)                                  Payment of Bank Loans
Pembayaran Liabilitas Sewa                                        (7.446.999)        (12.110.009)                               Payment of Lease Liabilities
Pembayaran Obligasi                                                      -           (30.000.000)                                     Payment to Bond Fee
Pembayaran Dividen Entitas Anak                                                                                             Payment Dividend of Subsidiaries
  Kepentingan Non Pengendali                                       (1.603.646)                   -                                Non-Controlling Interests
Pembayaran Bunga Pinjaman                                       (181.720.644)       (699.178.103)                                       Payment of Interest
Kas Bersih Diperoleh dari (Digunakan                                                                                       Net Cash Provided by (Used for)
    untuk) Aktivitas Pendanaan                                 (1.154.904.679)    (2.202.725.310)                                        Financing Activities
KENAIKAN BERSIH KAS DAN                                                                                                      INCREASE OF NET CASH AND

  SETARA KAS                                                    (825.532.508)     (1.736.996.474)                                       CASH EQUIVALENT

PENGARUH PERUBAHAN KURS MATA                                                                                             EFFECTS OF CHANGES FOREIGN
  UANG ASING                                                       3.778.642              (7.116.095)                                    EXCHANGE RATE
SALDO KAS DAN SETARA KAS PADA                                                                                          CASH AND CASH EQUIVALENTS AT
  AWAL PERIODE                                                 2.754.958.146       3.361.002.876                          THE BEGINNING OF THE YEAR

SALDO KAS DAN SETARA KAS PADA                                                                                            ENDING BALANCE OF CASH AND
  AKHIR PERIODE                                                1.933.204.280       1.616.890.307                                    CASH EQUIVALENT

Dalam Arus Kas tidak terdapat transaksi nonkas                                                               Cash flows did not contain non-cash transactions

Lihat Catatan atas Laporan Keuangan konsolidasian yang merupakan bagian yang See the accompanying Notes to the consolidated Financial Statements
tidak terpisahkan dari laporan keuangan secara keseluruhan                   which are an integral part of the financial statements as a whole.

Page 13
PT WIJAYA KARYA (PERSERO) Tbk                                               PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                         AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                      NOTES TO CONSOLIDATED
KONSOLIDASIAN                                                                       FINANCIAL STATEMENTS
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                      For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                               June 30, 2026 and December31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                              And for the 6 (six) Moths Periods
pada tanggal 30 Juni 2026 dan 2025                                                      Ended Jun 30, 2026 and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                          (In Thousand Rupiah, unless Otherwise Stated)
1. Umum                                                                                                  1. General
1.a. Pendirian Perusahaan                                      1.a. Establishment of the Company
     Perusahaan       Negara      Widjaja     Karja                 The State-owned Company Widjaja Karja (“the
     (“Perusahaan”) didirikan pada tanggal 29 Maret                 Company”) was established on March 29, 1961
     1961 berdasarkan Peraturan Pemerintah No. 64                   based on Government Regulation No. 64 Year
     Tahun 1961, dari perusahaan asing bernama                      1961, from a foreign company named
     "Naamloze Vennootschap Technische Handel                       "Naamloze Vennotschap Technische Handel
     Maatschappij en Bouwbedrijf Vis en Co.” yang                   Maatschappij en Bouwbedrijf Vis en Co.” which
     telah dikenakan nasionalisasi berdasarkan                      was nationalized pursuant to Government
     Peraturan Pemerintah No.2 Tahun 1960 dan                       Regulation No. 2 of 1960 and Decree of the
     Surat Keputusan Menteri Pekerjaan Umum dan                     Minister of Public Works and Electric Power
     Tenaga Listrik (PUTL) No.5 tanggal 11 Maret                    (PUTL) No. 5 dated March 11, 1960.
     1960.

    Berdasarkan Peraturan Pemerintah No. 40                        According to Government Regulation No. 40
    Tahun 1971, status Perusahaan berubah dari                     Year 1971, the Company’s status was changed
    Perusahaan Negara menjadi Perusahaan                           from Perusahaan Negara into Perusahaan
    (Persero). Selanjutnya, Perusahaan dinamakan                   (Persero). Furthermore, the Company’s name
    PT Wijaya Karya (Persero) berdasarkan Akta                     was changed to PT Wijaya Karya (Persero) in
    Perseroan     Terbatas     No.  110     tanggal                accordance with the Deed of Limited Liability
    20 Desember 1972 yang dibuat di hadapan                        Corporation No. 110 dated December 20, 1972
    Paramita Tamzil, pengganti Djojo Muljadi, S.H.,                of Paramita Tamzil, replacing Djojo Muljadi,
    Notaris di Jakarta, dan perubahan naskah                       S.H., Notary in Jakarta, and the change in the
    pendirian Perseroan Terbatas dari Kartini                      manuscript of establishment of Public Company
    Muljadi, S.H., Notaris di Jakarta berdasarkan                  of Kartini Muljadi, S.H., Notary in Jakarta was
    Akta No. 106 tanggal 17 April 1973. Akta                       based on Deed No. 106 dated April 17, 1973.
    tersebut telah disahkan oleh Menteri Kehakiman                 The Deed was approved by the Minister of
    Republik Indonesia pada tanggal 8 Mei 1973                     Justice of the Republic of Indonesia on May 8,
    dengan Surat Keputusan No. Y.A.5/165/14 serta                  1973 in his Decree No. Y.A.5/165/14 and was
    diumumkan dalam Berita Negara Republik                         published in State Gazette of the Republic of
    Indonesia No. 76 tanggal 21 September 1973,                    Indonesia No. 76 dated September 21, 1973,
    tambahan Berita Negara No. 683.                                Supplement No. 683.

    Anggaran Dasar Perseroan telah mengalami                       The Company’s Articles of Association have
    beberapa kali perubahan dan terakhir diubah                    been amended several times and were most
    berdasarkan Pernyataan Keputusan RUPS Luar                     recently amended based on the resolution of
    Biasa tanggal 15 Desember 2025 yang                            the     Extraordinary  General   Meeting   of
    dituangkan dalam Akta Notaris tanggal 12                       Shareholders held on December 15, 2025, as
    Januari 2026, antara lain terkait perubahan                    notarized in the Deed dated January 12, 2026,
    modal      dasar,  penyesuaian      kewenangan                 including changes to authorized capital,
    persetujuan RKAP, perubahan penggunaan                         adjustment of RKAP approval authority,
    dana PMN, serta perubahan kepemilikan saham                    changes in the utilization of State Capital
    dari Pemerintah Republik Indonesia kepada                      Injection (PMN) funds, and changes in share
    PT Danantara Asset Management (Persero),                       ownership from the Government of the Republic
    sesuai dengan daftar pemegang saham yang                       of Indonesia to PT Danantara Asset
    diterbitkan   oleh   Biro   Administrasi    Efek               Management (Persero), in accordance with the
    Perseroan.      Perubahan     tersebut     telah               list of shareholders issued by the Company’s
    memperoleh persetujuan Menteri Hukum dan                       Share Registrar. The amendments have been
    Hak Asasi Manusia Republik Indonesia                           approved by the Ministry of Law and Human
    berdasarkan Surat Keputusan Nomor AHU-                         Rights of the Republic of Indonesia based on
    0036871.AH.01.11.TAHUN         2026      tanggal               Decree No. AHU-0036871.AH.01.11.TAHUN
    18 Februari 2026 dan telah dicatat dalam Sistem                2026 dated February 18, 2026 and have been
    Administrasi Badan Hukum.                                      recorded in the Legal Entity Administration
                                                                   System.



                                                           6

Page 14
PT WIJAYA KARYA (PERSERO) Tbk                                                PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                          AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                       NOTES TO CONSOLIDATED
KONSOLIDASIAN                                                                        FINANCIAL STATEMENTS
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                      For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                               June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                              And for the 6 (six) Moths Periods
pada tanggal 30 Juni 2026 dan 2025                                                     Ended June 30, 2026 and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                          (In Thousand Rupiah, unless Otherwise Stated)
    Sesuai dengan Pasal 3 Anggaran Dasar                           In accordance with Article 3 of the Articles of
    Perusahaan, maksud dan tujuan Perusahaan                       Association, the purpose and objective of the
    adalah berusaha dalam industri konstruksi,                     Company is to engage in construction industry,
    industri pabrikasi, jasa penyewaan, jasa                       manufacturing industry, rental services, agency
    keagenan, investasi, agro industri, industri                   services, investment, agro-industry, energy
    energi, energi terbarukan dan energi konversi,                 industry, renewable energy and energy
    penyelenggaraan                   perkeretaapian,              conversion,        railway      operation,     port
    penyelenggaraan pelabuhan, penyelenggaraan                     management, airport management, logistics,
    kebandarudaraan,        logistik,  perdagangan,                trade, engineering procurement construction,
    engineering        procurement      construction,              area development and management, capacity
    pengembangan dan pengelolaan kawasan,                          building services in the field of construction
    layanan peningkatan kemampuan di bidang jasa                   services, information technology, engineering
    konstruksi, teknologi informasi, jasa enjinering               and planning services, investment and business
    dan perencanaan, investasi dan pengelolaan                     management in the field of infrastructure and
    usaha di bidang prasarana dan sarana dasar                     basic facilities (infrastructure) to produce goods
    (infrastruktur) untuk menghasilkan barang dan/                 and/ or services.
    atau jasa.

    Perusahaan beralamat di Jl. D.I Panjaitan Kav.                 The Company's head office is located at Jl. D.I.
    9-10, Jakarta Timur dengan lokasi kegiatan                     Panjaitan Kav. 9-10, East Jakarta, and its main
    utama di seluruh Indonesia dan luar negeri.                    activities are located throughout Indonesia and
    Perusahaan mulai beroperasi secara komersial                   overseas. The Company started commercial
    pada tahun 1961.                                               operations in 1961.

    Pemerintah Negara Republik Indonesia adalah                    The Government of the Republic of Indonesia is
    pemegang saham utama dari Perusahaan.                          the ultimate shareholder of the Company.

1.b. Penawaran Umum Saham Perusahaan                           1.b. Public Offering of the Company’s Shares
     Pada tanggal 11 Oktober 2007, Perusahaan                       On October 11, 2007, the Company obtained
     memperoleh pernyataan efektif dari Ketua                       the notice of effectivity from the Chairman of
     Badan Pengawas Pasar Modal dan Lembaga                         the Capital Market and Financial Institution
     Keuangan (Bapepam-LK) dengan suratnya No.                      Supervisory Agency (Bapepam-LK) in its letter
     S-5275/BL/2007 untuk melakukan penawaran                       No. S-5275/BL/2007 for its public offering of
     umum atas 1.846.154.000 lembar saham seri B                    1,846,154,000 shares of B series out of a total
     dari total 5.846.154.000 lembar saham                          of 5,846,154,000 shares from the Company’s
     Perusahaan kepada masyarakat, dengan nilai                     shares, with a par value of Rp100 (full amount)
     nominal Rp100 (nilai penuh) per saham dan                      per share and an offering price of Rp420 (full
     harga penawaran Rp420 (nilai penuh) per                        amount) per share based on the approval of
     saham yang didasarkan pada persetujuan                         Parliament of the Republic of Indonesia (DPR
     Dewan Perwakilan Rakyat Republik Indonesia                     RI) No. KD.01/3406/DPRRI/2007, dated April
     (DPR RI) No. KD.01/3406/DPRRI/2007 tanggal                     26, 2007, the Extraordinary Shareholders
     26 April 2007, Rapat Pemegang Saham Luar                       Meeting No. RIS-15/D2.MBU/2007, dated June
     Biasa No. RIS-15/D2.MBU/2007, tanggal 14 Juni                  14, 2007, and the approval letter of the Minister
     2007 dan surat persetujuan Menteri Negara                      of State Enterprises No. S-717/MBU/2007
     BUMN No. S-717/MBU/2007 tanggal 8 Oktober                      dated October 8, 2007 about Approval of
     2007 tentang persetujuan program Employee                      Program Employee Stock Allocation (ESA),
     Stock Allocation (ESA), Employee Stock Option                  Employee Stock Option Plan (ESOP) and
     Plan (ESOP) dan Management Stock Option                        Management Stock Option Plan (MSOP). On
     Plan (MSOP). Pada tanggal 29 Oktober 2007                      October 29, 2007, these shares were listed on
     saham tersebut telah dicatatkan pada Bursa                     the Jakarta Stock Exchange.
     Efek Jakarta.

    Sampai dengan tahun 2014, Perusahaan                            Until 2014, the total number of new shares
    menerbitkan total 303.071.000 saham baru untuk                  issued by the Company for ESOP and MSOP
    pelaksanaan ESOP dan MSOP dan total modal                       was 303,071,000 shares and total issued and
    ditempatkan dan disetor penuh menjadi                           paid up capital to 6,149,225,000 shares.

                                                           7

Page 15
PT WIJAYA KARYA (PERSERO) Tbk                                           PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                     AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                  NOTES TO CONSOLIDATED
KONSOLIDASIAN                                                                   FINANCIAL STATEMENTS
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                 For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                          June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                         And for the 6 (six) Moths Periods
pada tanggal 30 Juni 2026 dan 2025                                                Ended June 30, 2026 and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                     (In Thousand Rupiah, unless Otherwise Stated)
    6.149.225.000 saham.

    Pada tanggal 3 November 2016, Perusahaan                   On November 3, 2016, the Company obtained
    memperoleh pernyataan efektif dari Otoritas                the notice of effectivity from Financial Services
    Jasa Keuangan (OJK) No. S-631/D.04/2016 atas               Authority (OJK) No. S-631/D.04/2016 for the
    pernyataan pendaftaran dalam melakukan                     registration statement for the limited public
    penawaran umum terbatas.                                   offering.

    Pada tanggal 25 November 2016 seluruh saham                On November 25, 2016, all shares issued by
    Perusahaan yang diterbitkan melalui penawaran              the Company through the Limited Public
    umum terbatas sebanyak 2.820.726.372 saham                 Offering amounting to 2,820,726,372 shares
    telah tercatat di Bursa Efek Indonesia (BEI).              were listed on the Indonesia Stock Exchange
                                                               (IDX).

    Berdasarkan    penawaran    umum  tersebut,                Based on the limited offerring, the Company
    Perusahaan memperoleh tambahan modal                       obtained   additional   share     capital of
    saham sejumlah 2.820.726.372 lembar saham                  2,820,726,372 shares with a value of
    atau sebesar Rp282.072.637.                                Rp282,072,637.

    Berdasarkan       Pemberitahuan      Efektifnya            Based on Notification of the Effectiveness of
    Pernyataan     No.   S-52/D.04/2024    tanggal             Statement No. S-52/D.04/2024 dated March
    28 Maret 2024, Perusahaan telah mendapatkan                28, 2024, the Company has received an
    pernyataan efektif pendaftaran dalam rangka                effective registration statement regarding
    Penambahan Modal dengan Memberikan Hak                     Capital Increase by Granting Pre-emptive
    Memesan Efek Terlebih Dahulu II (“PMHMETD                  Rights II ("PMHMETD II"). Based on the
    II”). Berdasarkan Penambahan Modal dengan                  Capital Increase by Granting Pre-emptive
    Memberikan Hak Memesan Efek Terlebih                       Rights II ("PMHMETD II"), the Company
    Dahulu II (“PMHMETD II”) tersebut, Perusahaan              obtained an additional share capital through
    memperoleh tambahan modal saham sejumlah                   the issuance of 30,903,112,486 shares with a
    30.903.112.486 lembar saham dengan nilai                   value Rp3,090,311,249.
    sebesar Rp3.090.311.249.

    Pada tanggal 18 Februari 2025, Bursa Efek                  On February 18, 2025, the Indonesia Stock
    Indonesia       menerbitkan      pengumuman                Exchange issued an announcement of the
    Penghentian Sementara Perdagangan Efek                     Temporary Suspension of Trading of the
    Perusahaan       dengan     No.    Peng-SPT-               Company's Securities with No. Peng-SPT-
    00001/BEI.PP2/02-2025. Perusahaan menunda                  00001/BEI.PP2/02-2025.       The     Company
    pembayaran Sukuk Mudharabah Berkelanjutan II               postponed the payment of the Sustainable
    Wijaya Karya Tahap II Tahun 2022 Seri A                    Sukuk Mudharabah II Wijaya Karya Phase II
    (SMWIKA02ACN2) dan Obligasi Berkelanjutan II               Year 2022 Series A (SMWIKA02ACN2) and
    Wijaya Karya Tahap II Tahun 2022 Seri A                    Sustainable Bonds II Wijaya Karya Phase II
    (WIKA02ACN2) yang jatuh tempo pada tanggal                 Year 2022 Series A (WIKA02ACN2) which
    18 Februari 2025. Hal tersebut mengindikasikan             matured on February 18, 2025. This indicates
    adanya permasalahan pada kelangsungan                      problems with the Company's business
    usaha Perusahaan. Dengan mempertimbangkan                  continuity. Taking this into consideration, the
    hal tersebut, BEI memutuskan untuk melakukan               IDX decided to temporarily suspend Trading of
    penghentian sementara Perdagangan Efek                     the Company's Securities in all Markets
    Perusahaan di Seluruh Pasar terhitung sejak                starting from the First Securities Trading
    Sesi I Perdagangan Efek tanggal 18 Februari                Session on February 18, 2025.
    2025.

    Pada tanggal 30 Juni 2026 dan 31 Desember                  As of June 30, 2026 and December 31, 2025,
    2025      saham     Perusahaan     sejumlah                outstanding shares of the Company had
    39.873.063.858 lembar saham telah dicatatkan               39,873,063,858 outstanding shares listed on
    pada BEI.                                                  the BEI.


                                                           8

Page 16
PT WIJAYA KARYA (PERSERO) Tbk                                             PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                       AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                    NOTES TO CONSOLIDATED
KONSOLIDASIAN                                                                     FINANCIAL STATEMENTS
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                    For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                             June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                            And for the 6 (six) Moths Periods
pada tanggal 30 Juni 2026 dan 2025                                                   Ended June 30, 2026 and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                        (In Thousand Rupiah, unless Otherwise Stated)
1.c. Penawaran Umum Obligasi dan Sukuk                         1.c. Public Offering of the Bond and Sukuk
     Mudharabah                                                     Mudharabah
     Perusahaan memperoleh pernyataan efektif dari                 The Company received an effective notice
     Ketua Otoritas Jasa Keuangan (“OJK”) dengan                   from the Chairman of the Financial Services
     surat keputusan No. S-290/D.04/2020 tanggal                   Authority (“OJK”) by its decision letter
     14 Desember 2020 untuk melakukan penawaran                    No. S-290/D.04/2020 dated December 14,
     umum atas:                                                    2020 to conduct a public offering of:
     Obligasi Berkelanjutan I Wijaya Karya Tahap I                 Obligasi Berkelanjutan I Wijaya Karya Tahap I
     Tahun 2020                                                    Tahun 2020
     Jumlah       pokok       obligasi         sebesar             The principal amount of the bonds was
     Rp1.400.000.000 yang terdiri dari 3 seri:                     Rp1.400,000,000 which consisted of 3 series:
     • Seri A sebesar Rp231.000.000 dengan                         • Series A of Rp231,000,000 with an interest
        tingkat bunga 8,60% per tahun dengan                           rate of 8.60% per annum and a term of 3
        jangka waktu 3 tahun; dan                                      years; and
     • Seri B sebesar Rp429.000.000 dengan                         • Series B of Rp429,000,000 with an interest
        tingkat bunga 9,25% per tahun dengan                           rate of 9.25% per annum and a term of 5
        jangka waktu 5 tahun.                                          years;
     • Seri C sebesar Rp740.000.000 dengan                         • Series C of Rp740,000,000 with an interest
        tingkat bunga 9,85% per tahun dengan                           rate of 9.85% per annum and a term of 7
        jangka waktu 7 tahun.                                          years.

    Jangka waktu obligasi            Seri   A     sudah           The maturity period of Series A bonds has
    diperpanjang (Catatan 38).                                    been extended (Note 38).

    Sukuk Mudharabah Berkelanjutan I Wijaya Karya                 Sukuk Mudharabah Berkelanjutan I Wijaya
    Tahap I Tahun 2020                                            Karya Tahap I Tahun 2020
    Jumlah pokok sukuk sebesar Rp316.000.000                      The principal amount of sukuk was
    yang terdiri dari 3 seri:                                     Rp316,000,000 which consisted of 3 series:
    • Seri B sebesar Rp159.000.000 dengan                         • B Series of Rp159,000,000 with a nisbah
       pendapatan bagi hasil nisbah 38,54% (setara                   ratio of 38.54% (equivalent to interest rate
       bunga 9,25% per tahun) dengan jangka                          of 9.25% per annum) with a term of 5
       waktu 5 tahun; dan                                            years; and
    • Seri C sebesar Rp157.000.000 dengan                         • C Series of Rp157,000,000 with a nisbah
       pendapatan bagi hasil nisbah 41,04% (setara                   ratio of 41.04% (equivalent to interest rate
       bunga 9,85% per tahun) dengan jangka                          of 9.85% per annum) with a term of 7
       waktu 7 tahun.                                                years.

    Perusahaan menerima penuh hasil penerbitan                    The Company has fully received the proceeds
    Obligasi dan Sukuk Mudharabah pada tanggal                    from the issuance of its Bonds and Sukuk
    18 Desember 2020. Obligasi dan Sukuk                          Mudharabah on December 18, 2020. Bonds
    Mudharabah dicatatkan pada BEI.                               and Sukuk Mudharabah are listed on the IDX.

    Obligasi Berkelanjutan I Wijaya Karya Tahap II                Obligasi Berkelanjutan I Wijaya Karya Tahap II
    Tahun 2021                                                    Tahun 2021
    Jumlah       pokok        obligasi        sebesar             The principal amount of bonds was
    Rp2.500.000.000 yang terdiri dari 3 seri:                     Rp2,500,000,000 which consisted of 3 series:
    • Seri A sebesar Rp495.000.000 dengan                         • A series of Rp495,000,000 with an interest
       tingkat bunga 8,50% per tahun dengan                          rate of 8.50% per annum and a term of 3
       jangka waktu 3 tahun;                                         years;
    • Seri B sebesar Rp745.500.000 dengan                         • B Series of Rp745,500,000 with an interest
       tingkat bunga 9,10% per tahun dengan                          rate of 9.10% per annum and a term of 5
       jangka waktu 5 tahun;                                         years;
    • Seri C sebesar Rp1.259.500.000 dengan                       • C Series of Rp1,259,500,000 with an
       tingkat bunga 9,75% per tahun dengan                          interest rate of 9.75% per annum and a
       jangka waktu 7 tahun.                                         term of 7 years.

                                                           9

Page 17
PT WIJAYA KARYA (PERSERO) Tbk                                           PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                     AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                  NOTES TO CONSOLIDATED
KONSOLIDASIAN                                                                   FINANCIAL STATEMENTS
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                  For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                           June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                          And for the 6 (six) Moths Periods
pada tanggal 30 Juni 2026 dan 2025                                                 Ended June 30, 2026 and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                      (In Thousand Rupiah, unless Otherwise Stated)
    Jangka waktu obligasi            Seri   A     sudah         The maturity period of Series A bonds has
    diperpanjang (Catatan 38).                                  been extended (Note 38).

    Sukuk Mudharabah Berkelanjutan I Wijaya Karya               Sukuk Mudharabah Berkelanjutan I Wijaya
    Tahap II Tahun 2021                                         Karya Tahap II Tahun 2021
    Jumlah pokok sukuk sebesar Rp500.000.000                    The principal amount of the sukuk was
    yang terdiri dari 3 seri:                                   Rp500,000,000 which consisted of 3 series:
    • Seri A sebesar Rp134.300.000 dengan                       • A series of Rp134,300,000 with a Nisbah
       pendapatan bagi hasil nisbah 37,28% (setara                 ratio of 37.28% (equivalent to interest rate
       bunga 8,50% per tahun) dengan jangka                        of 8.50% per annum) with a term of 3
       waktu 3 tahun;                                              years;
    • Seri B sebesar Rp211.600.000 dengan                       • B Series of Rp211,600,000 with a nisbah
       pendapatan bagi hasil nisbah 39,91% (setara                 ratio of 39.91% (equivalent to interest rate
       bunga 9,10% per tahun) dengan jangka                        of 9.10% per annum) with a term of 5
       waktu 5 tahun;                                              years;
    • Seri C sebesar Rp154.100.000 dengan                       • C Series of Rp154,100,000 with a nisbah
       pendapatan bagi hasil nisbah 42,76% (setara                 ratio of 42.76% (equivalent to interest rate
       bunga 9,75% per tahun) dengan jangka                        of 9.75% per annum) with a term of 7
       waktu 7 tahun.                                              years.
     Perusahaan menerima penuh hasil penerbitan                 The Company has fully received the proceeds
     Obligasi dan Sukuk Mudharabah pada tanggal                 from the issuance of its Bonds and Sukuk
     3 Maret 2021. Obligasi dan Sukuk Mudharabah                Mudharabah on March 3, 2021. Bonds and
     dicatatkan pada BEI.                                       Sukuk Mudharabah are listed on the IDX.

     Jangka waktu sukuk Seri A sudah diperpanjang               The maturity period of Series A sukuk has
     (Catatan 38).                                              been extended (Note 38).

     Perusahaan memperoleh pernyataan efektif dari              The Company received an effective statement
     Ketua Otoritas Jasa Keuangan (“OJK”) dengan                from the Chairman of the Financial Services
     surat keputusan No. S-164/D.04/2021 tanggal                Authority (“OJK”) pursuan to its decision letter
     31 Agustus 2021 untuk melakukan penawaran                  No. S-164/D.04/2021 dated August 31, 2021
     umum atas:                                                 to conduct a public offering of:
     Obligasi Berkelanjutan II Wijaya Karya Tahap I             Obligasi Berkelanjutan II Wijaya Karya Tahap I
     Tahun 2021                                                 Tahun 2021
     Jumlah       pokok        obligasi        sebesar          The principal amount of the bonds was
     Rp1.179.000.000 yang terdiri dari 2 seri:                  Rp1,179,000,000 which consisted of 2 series:
     • Seri B sebesar Rp197.000.000 dengan                      • B Series of Rp197,000,000 with an interest
       tingkat bunga 8,55% per tahun dengan                       rate of 8.55% per annum and a term of
       jangka waktu 5 tahun;                                      5 years;
     • Seri C sebesar Rp982.000.000 dengan                      • C Series of Rp982,000,000 with an interest
       tingkat bunga 9,25% per tahun dengan                       rate of 9.25% per annum and a term of
       jangka waktu 7 tahun.                                      7 years.
      Sukuk Mudharabah Berkelanjutan II Wijaya                  Sukuk Mudharabah Berkelanjutan II Wijaya
      Karya Tahap I Tahun 2021                                  Karya Tahap I Tahun 2021
      Jumlah pokok sukuk sebesar Rp424.500.000                  The principal amount of the sukuk was
      yang terdiri dari 2 seri:                                 Rp424,500,000 which consisted of 2 series:
      • Seri B sebesar Rp91.500.000 dengan                      • B Series of Rp91,500,000 with nisbah
        pendapatan bagi hasil nisbah 61,07% (setara                revenue sharing ratio of 61.07% (equivalent
        bunga 8,55% per tahun) dengan jangka                       to interest rate of 8.55% per annum) with a
        waktu 5 tahun;                                             term of 5 years;
      • Seri C sebesar Rp333.000.000 dengan                     • C Series of Rp333,000,000 with nisbah
        pendapatan bagi hasil nisbah 66,07% (setara                revenue sharing ratio of 66.07% (equivalent
        bunga 9,25% per tahun) dengan jangka                       to interest rate of 9.25% per annum) with a
        waktu 7 tahun.                                             term of 7 years.

                                                           10

Page 18
PT WIJAYA KARYA (PERSERO) Tbk                                               PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                         AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                      NOTES TO CONSOLIDATED
KONSOLIDASIAN                                                                       FINANCIAL STATEMENTS
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                      For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                               June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                              And for the 6 (six) Moths Periods
pada tanggal 30 Juni 2026 dan 2025                                                     Ended June 30, 2026 and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                          (In Thousand Rupiah, unless Otherwise Stated)
    Perusahaan menerima penuh hasil penerbitan                  The Company has fully received the proceeds from
    Obligasi dan Sukuk Mudharabah pada tanggal                  the issuance of its Bonds and Sukuk Mudharabah
    8 September 2021. Obligasi dan Sukuk                        on September 8, 2021. Bonds and Sukuk
    Mudharabah dicatatkan pada BEI.                             Mudharabah are listed on the IDX.
Perusahaan memperoleh pernyataan efektif dari                   The Company received an effective statement from
Ketua Otoritas Jasa Keuangan (“OJK”) dengan surat               the Chairman of the Financial Services Authority
keputusan No. SP-001/OBL/KSEI/0122 tanggal 26                   (“OJK”) by its decision letter No. SP-
Januari 2022 untuk melakukan penawaran umum                     001/OBL/KSEI/0122 dated January 26, 2022 to
atas:                                                           conduct a public offering of:

Obligasi Berkelanjutan II Wijaya Karya Tahap II                 Obligasi Berkelanjutan II Wijaya Karya Tahap II
Tahun 2022                                                      Tahun 2022
Jumlah pokok obligasi sebesar Rp1.720.000.000                   The    principal   amount     of   bonds     was
yang terdiri dari 3 seri:                                       Rp1,720,000,000 which consisted of 3 series:
• Seri A sebesar Rp583.768.000 dengan tingkat                   • A Series of Rp583,768,000 with an interest rate
   bunga 6,50% per tahun dengan jangka waktu 3                    of 6.50% per annum and a term of 3 years;
   tahun;
• Seri B sebesar Rp723.611.714 dengan tingkat                   • B Series of Rp723,611,714 with an interest rate
   bunga 7,75% per tahun dengan jangka waktu 5                    of 7.75% per annum and a term of 5 years;
   tahun;
• Seri C sebesar Rp412.620.286 dengan tingkat                   • C Series of Rp412,620,286 with an interest rate
   bunga 8,30% per tahun dengan jangka waktu 7                    of 8.30% per annum and a term of 7 years.
   tahun.

Sukuk Mudharabah Berkelanjutan II Wijaya Karya                  Sukuk Mudharabah Berkelanjutan II Wijaya Karya
Tahap II Tahun 2022                                             Tahap II Tahun 2022
Jumlah pokok sukuk sebesar Rp750.000.000 yang                   The principal amount of the sukuk was
terdiri dari 3 seri:                                            Rp750,000,000 which consisted of 3 series:
• Seri       A    sebesar Rp412.900.000 dengan                  • A Series of Rp412,900,000 with nisbah revenue
   pendapatan bagi hasil nisbah 51,17% (setara                    sharing ratio of 51.17% (equivalent to interest
   bunga 6,50% per tahun) dengan jangka waktu 3                   rate of 6.50% per annum) with a term of 3 years
   tahun.                                                         ;
• Seri       B    sebesar Rp176.050.000 dengan                  • B Series of Rp176,050,000 with nisbah revenue
   pendapatan bagi hasil nisbah 64,58% (setara                    sharing ratio of 64.58% (equivalent to interest
   bunga 7,75% per tahun) dengan jangka waktu 5                   rate of 7.75% per annum) with a term of 5 years;
   tahun;
• Seri       C    sebesar Rp161.050.000 dengan                  • C Series of Rp161,050,000 with nisbah revenue
   pendapatan bagi hasil nisbah 69,17% (setara                    sharing ratio of 69.17% (equivalent to interest
   bunga 8,30% per tahun) dengan jangka waktu 7                   rate of 8.30% per annum) with a term of 7 years.
   tahun.
                                                                The Company has fully received the proceeds from
Perusahaan menerima penuh hasil penerbitan                      the issuance of its Bonds and Sukuk Mudharabah
Obligasi dan Sukuk Mudharabah pada tanggal 25                   on February 25, 2022. Bonds and Sukuk
Februari 2022. Obligasi dan Sukuk Mudharabah                    Mudharabah are listed on the IDX.
dicatatkan pada BEI.
                                                                The Company received an effective statement from
Perusahaan memperoleh pernyataan efektif dari                   the Chairman of the Financial Services Authority
Ketua Otoritas Jasa Keuangan (“OJK”) dengan surat               (“OJK”) by its decision letter No. S-214/ D.04/2022
keputusan No. S-214/D.04/2022 tanggal 27 Oktober                dated October 27, 2022 to conduct a public offering
2022 untuk melakukan penawaran umum atas:                       of:
                                                                Obligasi Berkelanjutan III Wijaya Karya Tahap I
Obligasi Berkelanjutan III Wijaya Karya Tahap I                 Tahun 2022
Tahun 2022                                                      The     principal    amount      of   bonds     was
Jumlah pokok obligasi sebesar Rp1.204.880.000                   Rp1,204,880,000 which consisted of 3 series:
yang terdiri dari 3 seri:
• Seri A sebesar Rp479.800.000 dengan tingkat                   • A Series of Rp479,800,000 with an interest rate
                                                           11

Page 19
PT WIJAYA KARYA (PERSERO) Tbk                                               PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                         AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                      NOTES TO CONSOLIDATED
KONSOLIDASIAN                                                                       FINANCIAL STATEMENTS
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                      For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                               June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                              And for the 6 (six) Moths Periods
pada tanggal 30 Juni 2026 dan 2025                                                     Ended June 30, 2026 and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                          (In Thousand Rupiah, unless Otherwise Stated)
  bunga 9,90% per tahun dengan jangka waktu 3                     of 9.90% per annum and a term of 3 years;
  tahun;
• Seri B sebesar Rp275.230.000 dengan tingkat                   • B Series of Rp275,230,000 with an interest rate
  bunga 10,50% per tahun dengan jangka waktu 5                    of 10.50% per annum and a term of 5 years;
  tahun;
• Seri C sebesar Rp449.850.000 dengan tingkat                   • C Series of Rp449,850,000 with an interest rate
  bunga 10,90% per tahun dengan jangka waktu 7                    of 10.90% per annum and a term of 7 years.
  tahun.

Sukuk Mudharabah Berkelanjutan III Wijaya Karya                 Sukuk Mudharabah Berkelanjutan III Wijaya Karya
Tahap I Tahun 2022                                              Tahap I Tahun 2022
Jumlah pokok sukuk sebesar Rp281.815.000 yang                   The principal amount of the sukuk was
terdiri dari 3 seri:                                            Rp281,815,000 which consisted of 3 series:
•     Seri A sebesar Rp109.325.000 dengan                       •   A Series of Rp109,325,000 with nisbah
      pendapatan bagi hasil nisbah 66,00% (setara                   revenue sharing ratio of 66.00% (equivalent to
      bunga 9,90% per tahun) dengan jangka waktu 3                  interest rate of 9.90% per annum) with a term
      tahun;                                                        of 3 years;
•     Seri B sebesar Rp140.490.000 dengan                       •   B Series of Rp140,490,000 with nisbah
      pendapatan bagi hasil nisbah 70,00% (setara                   revenue sharing ratio of 70.00% (equivalent to
      bunga 10,50% per tahun) dengan jangka waktu                   interest rate of 10.50% per annum) with a term
      5 tahun;                                                      of 5 years;
•     Seri C sebesar Rp32.000.000          dengan               •   C Series of Rp32,000,000 with nisbah revenue
      pendapatan bagi hasil nisbah 72,67% (setara                   sharing ratio of 72.67% (equivalent to interest
      bunga 10,90% per tahun) dengan jangka waktu                   rate of 10.90% per annum) with a term of 7
      7 tahun.                                                      years.

Perusahaan menerima penuh hasil penerbitan                      The Company has fully received the proceeds from
Obligasi dan Sukuk Mudharabah pada tanggal 30                   the issuance of its Bonds and Sukuk Mudharabah
November 2022. Obligasi dan Sukuk Mudharabah                    on November 30, 2022. Bonds and Sukuk
dicatatkan pada BEI.                                            Mudharabah are listed on the IDX.




                                                           12

Page 20
PT WIJAYA KARYA (PERSERO) Tbk                                                        PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                  AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                               NOTES TO CONSOLIDATED
KONSOLIDASIAN                                                                                FINANCIAL STATEMENTS
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                               For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                        June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                                      And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                              Ended June 30, 2026 and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                                   (In Thousand Rupiah, unless Otherwise Stated)

1.d. Dewan Komisaris, Direksi, Komite Audit dan                      1.d. Board of Commissioners, Directors, Audit
     Karyawan                                                             Committee and Employees
     Berdasarkan Akta No. 6 tanggal 11 Mei 2026                           Based on Deed No. 6 dated May 11, 2026
     dibuat di hadapan Fathiah Helmi, S.H., Notaris di                    made in presence of Fathiah Helmi, S.H.,
     Jakarta, susunan Dewan Komisaris dan Direksi                         Notary in Jakarta, the Board of Commissioners
     pada 30 Juni 2026 sebagai berikut:                                   and Directors as of June 30, 2026 are as
                                                                          follows:
                                                             2026

     Dewan Komisaris                                                                                    Board of Commissioners
      Komisaris Utama                               Apri Artoto, S.T., M.P.P.M                          President Commissioner
      Komisaris                                     Suwarta, S.E., S.H., M.H.                                     Commissioner
      Komisaris Independen                  Prof. Dr. Harris Arthur Hedar, SH., MH                   Independent Commissioner
      Komisaris Independen                            Ir. Adityawarman, MM                           Independent Commissioner
      Komisaris Independen                  Prof. Ir. Suryo Hapsoro Tri Utomo, Phd                   Independent Commissioner

     Dewan Direksi                                                                                            Board of Directors
      Direktur Utama                        Ir. I Ketut Pasek Senjaya Putra, S.T., M.M.                       President Director
      Direktur Keuangan                  Dr. Mulyadi, SE, MM, MSi, Akt, CA, CPMA, SAS                       Director of Finance
      Direktur Manajemen Sumber Daya                                                                 Director of Human Capital
        Manusia dan Transformasi                  Ir. Hadjar Seti Adji, MEngSc                Management and Transformation
      Direktur Manajemen Risiko                                                                   Director of Risk Management
        dan Legal                            Vera Kirana, ST., MM., QRGP., CERG                                     and Legal
      Direktur Operasi I                               Hananto Aji, S.T.                                Director of Operations I
      Direktur Operasi II                     Ir. Sonny Setyadhy, ST., MM., IPM                        Director of Operations II


    Berdasarkan Akta No. 8 tanggal 6 Juni 2024                             Based on Deed No. 8 dated June 6, 2024
    dibuat di hadapan Fathiah Helmi, S.H., Notaris                         made in presence of Fathiah Helmi, S.H.,
    di Jakarta dan telah mendapat Penerimaan                               Notary in Jakarta and has received Notification
    Pemberitahuan Perubahan Data Perseroan dari                            of Changes in Company Data from the
    Menteri Hukum dan Hak Asasi Manusia                                    Minister of Law and Human Rights of the
    Republik Indonesia No. AHU-AH.01.09-0211181                            Republic of Indonesia No. AHU-AH.01.09-
    tanggal 6 Juni 2024, susunan Dewan Komisaris                           0211181, June 6, 2024, the composition of the
    dan Direksi pada 31 Desember 2025 sebagai                              Board of Commissioners and Directors as of
    berikut:                                                               December 31, 2025 are as follows:

                                                            2025

     Dewan Komisaris                                                                                    Board of Commissioners
      Komisaris Utama                                 Ir. Jarot Widyoko, SP                             President Commissioner
      Komisaris                                     Prof. Dr. Firdaus Ali, MSc                                    Commissioner
      Komisaris Independen                  Prof. Dr. Harris Arthur Hedar, SH., MH                   Independent Commissioner
      Komisaris Independen                            Ir. Adityawarman, MM                           Independent Commissioner
      Komisaris Independen                  Prof. Ir. Suryo Hapsoro Tri Utomo, Phd                   Independent Commissioner
      Komisaris Independen                                   Rusmanto                                Independent Commissioner

     Dewan Direksi                                                                                            Board of Directors
      Direktur Utama                           Agung Budi Waskito, ST., M. Tech                               President Director
      Direktur Keuangan                               Sumadi, SE., MM                                       Director of Finance
      Direktur Manajemen Sumber Daya                                                                 Director of Human Capital
        Manusia dan Transformasi                  Ir. Hadjar Seti Adji, MEngSc                Management and Transformation
      Direktur Manajemen Risiko                                                                   Director of Risk Management
        dan Legal                                Fafan Khoirul Fanani ST., MSc                                      and Legal
      Direktur Operasi                                  Hananto Aji, ST                                  Director of Operations




                                                            13

Page 21
PT WIJAYA KARYA (PERSERO) Tbk                                                          PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                    AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                 NOTES TO CONSOLIDATED
KONSOLIDASIAN                                                                                  FINANCIAL STATEMENTS
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                             For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                      June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                                     And for the 6 (six) Moths Periods
pada tanggal 30 Juni 2026 dan 2025                                                            Ended June 30, 2026 and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                                 (In Thousand Rupiah, unless Otherwise Stated)
    Berdasarkan Surat Keputusan Dewan Komisaris                       Based on Decrees of the Board of
    No. 65/DK/WIKA/2023 tanggal 3 Juli 2023 dan                       Commissioners No. 65/DK/WIKA/2023 dated July
    No. 80/DK/WIKA/2023 tanggal 24 Juli 2023,                         3, 2023 No. 80/DK/WIKA/2023 dated July 24,
    susunan Komite Audit tanggal 30 Juni 2026 dan                     2023, the composition of the Audit Committee as
    31 Desember 2025 adalah sebagai berikut:                          of June 30, 2026 and December 31, 2025 is as
                                                                      follows:

     Komite Audit                                                                                             Audit Committee
      Ketua                                 Prof. Ir. Suryo Hapsoro Tri Utomo, Ph.D.                                Chairman
      Wakil Ketua                                      Ir. Adityawarman, MM                                    Vice Chairman
      Anggota                                  Roy Yournalista SE, MBA, Ak, CA                                       Member
      Anggota                                          Rita Rufaida Ak, MBA                                          Member


    Berdasarkan Surat Keputusan Direksi No.                           Based on Decree of teh Board of Directors No.
    SK.02.01/A.DIR.00148/2025 tanggal 21 Mei                          SK.02.01/A.DIR.00148/2025 dated May 21, 2025,
    2025,    Sekretaris    Perusahaan  tanggal                        the Corporate Secretary as of June 30, 2026 and
    30 Juni 2026 dan 31 Desember 2025 adalah                          December 31, 2025 is Ngatemin, ST., MT
    Ngatemin, ST., MT.

    Jumlah pegawai Perusahaan dan entitas anak                        The total number of employees of the Company
    pada tanggal 30 Juni 2026 dan 31 Desember                         and its subsidiaries as of June 30, 2026 and
    2025 masing-masing sebanyak 3.465 dan 3.526                       December 31, 2025 are 3,465 and 3,526,
    (tidak diaudit).                                                  respectively (unaudited).




                                                           14

Page 22
PT WIJAYA KARYA (PERSERO) Tbk                                                                                                                             PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                                                                                       AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                                                                                    NOTES TO CONSOLIDATED
KONSOLIDASIAN                                                                                                                                                     FINANCIAL STATEMENTS
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                                                                                                 For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                                                                                          June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                                                                                                         And for the 6 (six) Moths Periods
pada tanggal 30 Juni 2026 dan 2025                                                                                                                                Ended June 30, 2026 and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                                                                                                     (In Thousand Rupiah, unless Otherwise Stated)
1.e. Struktur Entitas Anak                                                                                                     1.e. Structure of the Subsidiaries
     Perusahaan memiliki, baik secara langsung                                                                                      The Company owns, either directly or indirectly,
     maupun tidak langsung, lebih dari 50% saham                                                                                    over 50% of ownership on the following
     entitas anak berikut:                                                                                                          subsidiaries:
                                                                                                                                        Tahun Mulai       Persentase Kepemilikan/    Total Aset Sebelum Eliminasi/
                                                                                                                                     Operasi Komersial/   Percentage of Ownership   Total Assets Before Elimination
                   Entitas Anak/                            Domisili/                        Kegiatan Usaha/                         Year of Commercial     2026          2025        2026                  2025
                   Subsidiaries                             Domicile                        Scope of Business                             Operation           %             %          Rp                    Rp
Dikonsolidasi/Consolidated
Kepemilikan Langsung/Direct Ownership
  PT Wijaya Karya Beton Tbk                                 Indonesia      Industri Beton/ Concrete Industry                               1997             60,00         60,00      6.312.265.287         6.290.468.417
  PT Wijaya Karya Realty                                    Indonesia      Real Estate                                                     2000             95,10         95,10     12.487.351.940        15.708.001.862
  PT Wijaya Karya Industri dan Konstruksi                   Indonesia      Industri dan Konstruksi/                                        2000             98,57         98,57      1.837.487.838         1.770.132.040
                                                                           Industrial and Construction
  PT Wijaya Karya Rekayasa Konstruksi                       Indonesia      Konstruksi dan Mekanik Listrik/                                 1984             98,94         98,94      1.145.206.783           805.239.203
                                                                           Construction and Electrical & Mechanical
  PT Wijaya Karya Bangunan Gedung Tbk                       Indonesia      Konstruksi dan Properti/                                        2008             69,30         69,30      3.726.846.783         4.043.811.090
                                                                           Construction and Property
  PT Wijaya Karya Bitumen                                   Indonesia      Tambang Aspal/Asphalt Mining                                    1984             99,39         99,39        206.738.440           208.379.821
  PT Wijaya Karya Serang Panimbang                          Indonesia      Jalan Tol/Toll Road                                             2017             84,17         84,17      7.718.311.321         7.513.058.104
  PT Wijaya Karya Tirta Jaya Jatiluhur                      Indonesia      Pengelolaan air/Water Management                                2021             85,31         85,31      1.737.366.742         1.728.272.437
  Kerja Sama Usaha - PT Wijaya Karya
    (Persero) Tbk - PT Balai Pustaka (Persero)              Indonesia      Pengembangan dan Pengelolaan Tanah/                             2014            100,00        100,00        496.047.198           500.967.037
                                                                           Land Development and Management
  KSO - PT Wijaya Karya (Persero) Tbk-                      Indonesia      Pengelolaan Lahan/ Land Management                              2018            100,00        100,00        429.182.875           426.210.165
    PT Wijaya Karya Realty
  KSO - PT Wijaya Karya (Persero) Tbk-                      Indonesia      Pekerjaan Konstruksi Fisik dan Bangunan/                        2022            100,00        100,00        162.645.482           176.487.444
    PT Wijaya Karya Bangunan Gedung Tbk                                    Building and Civil Construction Works
                                                                           RS UPT Vertikal Surabaya
  KSO - PT Wijaya Karya (Persero) Tbk-                      Indonesia      Pekerjaan Pembangunan/ Development Work                         2020            100,00        100,00             20.332                20.554
    PT Wijaya Karya Bangunan Gedung Tbk                                    Paket 1 Pembangunan SGLC dan/ and
                                                                           ERIC Universitas Gajah Mada
  KSO - PT Wijaya Karya (Persero) Tbk-                      Indonesia      Pekerjaan Konstruksi Pembangunan/                               2021            100,00        100,00          9.232.924            10.256.402
    PT Wijaya Karya Bangunan Gedung Tbk                                    Development Construction Work
                                                                           Gedung 1 dan 2 ITB Innovation
                                                                           Park (IIP) Bandung Teknopolis
  KSO - PT Wijaya Karya (Persero) Tbk-                      Indonesia      Pekerjaan Pembangunan/ Development Work                         2019            100,00        100,00          3.764.142             6.401.248
    PT Wijaya Karya Bangunan Gedung Tbk                                    Hotel Domestik Terminal 3
  KSO - PT Wijaya Karya (Persero) Tbk-                      Indonesia      Pekerjaan Pembangunan/ Development Work                         2021            100,00        100,00          3.234.612             2.865.515
    PT Wijaya Karya Bangunan Gedung Tbk                                    Rumah Dinas Prajurit TNI-AD
  KSO - PT Wijaya Karya (Persero) Tbk-                      Indonesia      Pekerjaan Pembangunan/ Development Work                         2019            100,00        100,00            272.018               693.508
    PT Wijaya Karya Bangunan Gedung Tbk                                    Paket 3 AGLC, ASLC, dan/ and IFFLC
                                                                           Universitas Gadjah Mada
  KSO - PT Wijaya Karya (Persero) Tbk-                      Indonesia      Pekerjaan Pembangunan Gedung Kantor                             2023            100,00        100,00         23.506.078            34.212.657
    PT Wijaya Karya Bangunan Gedung Tbk                                    Perwakilan Bank Indonesia Provinsi Papua Barat/
                                                                           Construction Work for the Bank Indonesia
                                                                           Representative Office Building,
                                                                           West Papua Province
  KSO - PT Wijaya Karya (Persero) Tbk-                      Indonesia      Pekerjaan Pengembangan Sistem Operasional                       2024            100,00        100,00         31.065.654            38.073.598
    PT Wijaya Karya Bangunan Gedung Tbk                                    INATEWS (Gedung Jakarta dan Bali)/
                                                                           Construction Work for INATEWS Operational
                                                                           System Development (Buildings Jakarta and Bali)
  KSO - PT Wijaya Karya (Persero) Tbk-                      Indonesia      Pelaksanaan Pekerjaan Mobile Power Plant and                    2024            100,00        100,00         85.357.163           114.670.001
    PT Wijaya Karya Rekayasa Konstruksi                                    Fixed Type Gas Engine Power Plant Package III/
                                                                           Construction Work Mobile Power Plant and
                                                                           Fixed Type Gas Engine Power Plant Package III/
  KSO - PT Wijaya Karya (Persero) Tbk-                      Indonesia      Pekerjaan Penanganan Pergerakan Tanah Jalan Tol                 2025            100,00        100,00         99.187.936           152.564.609
    PT Wijaya Karya Beton                                                  Cileunyi-Sumedang-Dawuan ("Cisumdawu")
                                                                           Earthmovement Handling Work on the
                                                                           Cileunyi-Sumedang-Dawuan ("Cisumdawu") Toll Road

Kepemilikan Tidak Langsung Melalui/
  Indirect Ownership Through
  PT Wijaya Karya Komponen Beton *)                         Indonesia      Industri Beton/Concrete Industry                                2012             51,00         51,00        191.462.038           184.752.857
  PT Wijaya Karya Krakatau Beton *)                         Indonesia      Industri Beton/Concrete Industry                                2014             70,00         70,00         98.860.073           134.973.598
  PT Citra Lautan Teduh *)                                  Indonesia      Industri Beton/Concrete Industry                                1994             99,50         99,50        431.489.980           446.340.031
  PT Wijaya Karya Pracetak Gedung *)                        Indonesia      Industri Beton/Concrete Industry                                2017            100,00        100,00        240.941.236           248.002.996
  PT Wege Solusi Proklamasi**)                              Indonesia      Properti dan Realti/Property and Realty                         2019            100,00        100,00        149.996.096           149.996.096
  PT Makassar Coastal City ***)                             Indonesia      Properti dan Realti/Property and Realty                         2016             99,31         99,31        429.904.166           427.256.884
  PT Kurnia Realty Jaya ***)                                Indonesia      Properti dan Realti/Property and Realty                         2000             56,73         56,73        594.745.063           831.718.570
  PT Senggigi Pratama Internasional ***)                    Indonesia      Pariwisata dan Perhotelan/                                      1997             99,90         99,90        205.385.917           216.978.997
                                                                           Tourism and Hospitality
  PT Indo Benhil Karunia Jaya                               Indonesia      Properti, Realti, dan Jasa/Property, Realty and Service         2021            100,00        100,00        745.570.609           745.444.405
  PT Wijaya Karya Aspal *****)                              Indonesia      Tambang Aspal/Asphalt Mining                                    2018             99,86         99,86         62.739.921            65.073.804
  PT Wijaya Karya Industri Energi ******)                   Indonesia      Industri Energi Terbarukan/Renewable                            2010            100,00        100,00        317.181.153           242.163.220
                                                                             Energy Industry
  *) Entitas anak/Subsidiary of PT Wijaya Karya Beton Tbk
  **) Entitas anak/Subsidiary of PT Wijaya Karya Bangunan Gedung Tbk
  ***) Entitas anak/Subsidiary of PT Wijaya Karya Realty
  ****) Entitas anak/Subsidiary of PT Wijaya Karya Industri & Konstruksi
  *****) Entitas anak/Subsidiary of PT Wijaya Karya Bitumen
  ******) Entitas anak/Subsidiary of PT Wijaya Karya Rekayasa Konstruksi




                                                                                                                      15

Page 23
PT WIJAYA KARYA (PERSERO) Tbk                                                  PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                            AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                         NOTES TO CONSOLIDATED
KONSOLIDASIAN                                                                          FINANCIAL STATEMENTS
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                        For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                 June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                               And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                       Ended June 30, 2026 and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                            (In Thousand Rupiah, unless Otherwise Stated)
PT Wijaya Karya Beton Tbk (“WIKA Beton”)                        PT Wijaya Karya Beton Tbk (“WIKA Beton”)
Anggaran Dasar telah mengalami beberapa kali                    The Article of Association has been amended
perubahan dan terakhir kali diubah dengan Akta                  several times and was last amended by Deed No. 75
No. 75 tanggal 30 Mei 2024 yang dibuat di hadapan               dated May 30, 2024, made in presence of Ir. Nanette
Ir. Nanette Cahyanie Handari Adi Warsito, S.H.,                 Cahyanie Handari Adi Warsito, S.H., Notary in South
Notaris di Jakarta Selatan dan telah mendapatkan                Jakarta and received approval from the Minister of
persetujuan dari Menteri Hukum dan Hak Asasi                    Law and Human Rights of the Republic of
Manusia Republik Indonesia No. AHU-AHA.01.03-                   Indonesian No. AHU-AHA.01.03-0148744 dated
0148744 tanggal 19 Juni 2024.                                   June 19, 2024.

PT Wijaya Karya Realty (“WIKA Realty”)                          PT Wijaya Karya Realty (“WIKA Realty”)
Anggaran Dasar WIKA Realty telah mengalami                      The Articles of Association of WIKA Realty have
perubahan, berdasarkan Akta Pengalihan Hak atas                 been amended, based on Deed No. 20 dated
Saham Nomor 20 tanggal 19 Desember 2024 yang                    December 19, 2024 made in the precense of Fessy
dibuat di hadapan Fessy Farizqoh Alwi, S.H., M.Kn.,             Farizqoh Alwi, S.H., M.Kn., Notary in South Jakarta
Notaris di Kota Jakarta Selatan, menyetujui                     City, approved the transfer of shares of WIKA Realty
pengalihan saham WIKA Realty milik PT Hotel                     amounting to 16,566,614,132 shares owned by PT
Indonesia Natour (HIN) sebanyak 16,566,614,132                  Hotel Indonesia Natour (HIN) to the Company and
saham kepada Perusahaan dan pengalihan saham                    transfer of share of HIPRO owned by the Company
HIPRO milik Perusahaan ke HIN. Atas transaksi                   to HIN. Due to this transaction, the Company's
tersebut, persentase kepemilikan Perusahaan di                  shareholding in WIKA Realty changed from 72,51%
WIKA Realty berubah dari 72.51% menjadi 95.10%.                 to 95,10%.

PT Wijaya Karya Industri dan Konstruksi (“WIKA                  PT Wijaya Karya Industri dan Konstruksi (“WIKA
IKON”)                                                          IKON”)
Anggaran Dasar WIKA IKON telah mengalami                        WIKA IKON’s Articles of Association have been
beberapa perubahan, terakhir dengan Akta No. 30                 amended several times, most recently by Deed No.
tertanggal 21 Mei 2024 dari Ryan Bayu Candra,                   30 dated May 21, 2024 of Ryan Bayu Candra, S.H.,
S.H., Notaris di Jakarta. Akta perubahan Anggaran               Notary in Jakarta. The amendment to the Company's
Dasar Perseroan ini telah menerima Persetujuan                  Articles of Association has received approval for
Perubahan Anggaran Dasar dari Menteri Hukum                     amendment of the Articles of Association from the
dan Hak Asasi Manusia Republik Indonesia No.                    Minister of Law and Human Rights of the Republic of
AHU-0030961.AH.01.02 Tahun 2024 tanggal 28 Mei                  Indonesia No. AHU-0030961.AH.01.02 of 2024,
2024.                                                           dated May 28, 2024.

PT Wijaya Karya Rekayasa Konstruksi (“WIKA                      PT Wijaya Karya Rekayasa Konstruksi (“WIKA
RK”)                                                            RK”)
Anggaran Dasar WIKA RK telah mengalami                          The Articles of Association of WIKA RK have been
beberapa kali perubahan, perubahan terakhir                     amended several times. The latest amendment was
berdasarkan Akta Notaris No. 50 tanggal 30 Juni                 based on Notarial Deed No. 50 dated June 30, 2025
2025 tentang Pernyataan Keputusan Pemegang                      concerning the Statement of Shareholders’
Saham di Luar Rapat oleh Ryan Bayu Candra, S.H.,                Resolution Outside a Meeting, drawn up by Ryan
M.Kn. di Jakarta, dimana WIKA RK menerima                       Bayu Candra, S.H., M.Kn., in Jakarta, which, WIKA
tambahan setoran modal sebesar Rp190.903,                       RK received an additional capital injection amounting
dengan metode debt equity swap. persentase                      to Rp190,903 through a debt-equity swap
penyertaan saham Perusahaan di WIKA RK                          mechanism. As a result, the Company’s
berubah dari 97,99% menjadi 98,94%.                             shareholding in WIKA RK increased from 97.99% to
                                                                98.94%.

PT Wijaya Karya Bitumen (“WIKA Bitumen”)                        PT Wijaya Karya Bitumen (“WIKA Bitumen”)
WIKA Bitumen telah mengalami beberapa kali                      The Articles of Association of WIKA Bitumen has
perubahan, terakhir terkait dengan peningkatan                  been amended several times, the most recent relate
modal ditempatkan dan disetor penuh sebesar                     to the increase in issued and fully paid-up capital
Rp100.000.000 atau 100.000 lembar saham yang                    amounting to Rp100,000,000 or 100,000 shares,
dituangkan dalam Akta No. 28 tanggal 19 April 2024              which documented in Deed No. 28 dated April 19,
yang dibuat di hadapan Ryan Bayu Candra, S.H.,                  2024, executed before Ryan Bayu Candra, S.H.,
M.Kn., Notaris di Jakarta Timur, yang telah dicatat             M.Kn., a Notary in East Jakarta, and has been
                                                           14

Page 24
PT WIJAYA KARYA (PERSERO) Tbk                                                PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                          AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                       NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                   FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                       For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                              And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                             Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                           (In Thousand Rupiah, unless Otherwise Stated)
dalam database Sistem Administrasi Badan Hukum                  recorded in the Legal Entity Administration System
Kementerian Hukum dan Hak Asasi Manusia                         database of the Ministry of Law and Human Rights
Republik Indonesia sesuai dengan suratnya tanggal               of the Republic of Indonesia in accordance with its
24 April 2024 No. AHU-AH.01.03-0092826.                         letter dated April 24, 2024, No. AHU-AH.01.03-
                                                                0092826.

Persentase penyertaan saham Perusahaan di WIKA                  The Company's shareholding percentage in WIKA
Bitumen sebesar 99.39%.                                         Bitumen is 99,39%.

PT Wijaya Karya Serang Panimbang (“WSP”)                        PT Wijaya Karya Serang Panimbang (“WSP”)
Anggaran Dasar WIKA Serpan telah mengalami                      The Articles of Association of WIKA Serpan was
beberapa kali perubahan. Perubahan terakhir                     amended several times. The most recent
mengenai Peningkatan Modal Ditempatkan/Disetor                  amendment related to the increase in issued/paid-
yang seluruhnya disetor oleh Perusahaan yang                    up capital, which has been fully paid by the
dituangkan dalam Akta No. 08 tanggal 28 Maret                   Company, which documented in Deed No. 08 dated
2024 yang dibuat di hadapan John Heri Azmi, S.H.,               March 28, 2024, made in the presence of John Heri
Notaris di Kabupaten Lebak, dan telah dicatat dalam             Azmi, S.H., a Notary in Lebak Regency, and has
database Sistem Administrasi Badan Hukum                        been recorded in the Legal Entity Administration
Kementerian Hukum dan Hak Asasi Manusia                         System database of the Ministry of Law and Human
Republik     Indonesia  sesuai     dengan      Surat            Rights of the Republic of Indonesia according to the
Penerimaan Pemberitahuan Perubahan Anggaran                     Notification of Amendment to the Articles of
Dasar Nomor: AHU-AH.01.03-0079040 tertanggal                    Association Receipt Number: AHU-AH.01.03-
2 April 2024. Atas transaksi ini, persentase                    0079040 dated April 2, 2024. For this transaction,
kepemilikan Perusahaan di WSP berubah dari                      the Company's ownership percentage in WSP has
82,98% menjadi 84,17%.                                          changed from 82.98% to 84.17%.

PT WIKA Tirta Jaya Jatiluhur (“WTJJ”)                           PT WIKA Tirta Jaya Jatiluhur (“WTJJ”)
Berdasarkan Akta Notaris No. 10 tanggal                         Based on Notarial Deed No. 10 dated December
12 Desember 2024 tentang Pernyataan Keputusan                   12, 2024 concerning Statement of Shareholders'
Rapat Pemegang Saham oleh Notaris Lia Amalia,                   Meeting Resolution Meeting by Notary Lia Amalia,
S.H., M.Kn. di Jakarta, WTJJ menerima tambahan                  S.H., M.Kn. in Jakarta, WTJJ received an additional
setoran    modal     dari   Perusahaan    sebesar               capital contribution from the Company of
Rp18.993.000 dan PT Jaya Konstruksi Manggala                    Rp18,993,000 and PT Jaya Konstruksi Manggala
Pratama Tbk sebesar Rp28.667.000 dan jumlah                     Pratama Tbk of Rp28,667,000 and the amount is
tersebut dicatat sebagai peningkatan modal disetor              recorded as an increase in paid-up capital and
penuh dan ditempatkan dalam rangka penerbitan                   placed in the context of issuing 47,660 new shares.
saham baru sebanyak 47.660 saham. Atas transaksi                For this transaction, the percentage of the
ini, persentase penyertaan saham Perusahaan di                  Company’s investment in shares of WTJJ changed
WTJJ berubah dari 88,38% menjadi 83,78%.                        from 88.38% to 83.78%.

Berdasarkan Akta Notaris No.30 tanggal 31                       Based on Notarial Deed No. 30 dated December
Desember 2025 tentang Pernyataan Keputusan                      31, 2025 concerning the Statement of Shareholders'
Rapat Pemegang Saham oleh Notaris Lia Amalia,                   Meeting Resolutions by Notary Lia Amalia, S.H.,
S.H., M.Kn. di Jakarta, WTJJ menerima tambahan                  M.Kn. in Jakarta, WTJJ received additional capital
setoran modal dari Perusahaan Rp52.437.000                      injection from the Company of Rp52,437,000
dengan debt to equity swap, jumlah tersebut dicatat             through a debt-to-equity swap, the amount was
sebagai peningkatan modal disetor penuh dan                     recorded as an increase in fully paid-in capital and
ditempatkan dalam rangka penerbitan saham baru                  placed in the context of the issuance of new shares
sebanyak 52.437 saham. Atas transaksi ini,                      totaling 52,437 shares. Due to this transaction, the
persentase penyertaan saham Perusahaan di WTJJ                  Company's shareholding percentage in WTJJ
berubah dari 83,78% menjadi 85,31%.                             changed from 83.78% to 85.31%.

KSU - PT Wijaya Karya (Persero) Tbk - PT Balai                  KSU - PT Wijaya Karya (Persero) Tbk - PT Balai
Pustaka (Persero) – (KSU Iswara)                                Pustaka (Persero) – (KSU Iswara)
KSU Tamansari Iswara dibentuk berdasarkan Surat                 KSU Tamansari Iswara was formed based on the
Perjanjian Kerja Sama Usaha (KSU) antara PT                     Business Cooperation Agreement (KSU) between

                                                           15

Page 25
PT WIJAYA KARYA (PERSERO) Tbk                                               PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                         AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                      NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                  FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                       For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                              And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                             Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                           (In Thousand Rupiah, unless Otherwise Stated)
Wijaya Karya (Persero) Tbk dengan PT Balai                      PT Wijaya Karya (Persero) Tbk and PT Balai
Pustaka (Persero) nomor TP.01.03/A.DIR.9522/2013                Pustaka            (Persero)           number
dan nomor 026/SET/PJ.12.2013 tanggal 24                         TP.01.03/A.DIR.9522/2013      and      number
Desember 2013 mengenai Pengembangan dan                         026/SET/PJ.12.2013 dated December 24, 2013
Pengelolaan Tanah. Pengubahan #01 Perjanjian                    concerning Land Development and Management.
Kerja Sama Usaha mengenai Pengembangan dan                      Amendment #01 to the Business Cooperation
Pengelolaan             Tanah             nomor                 Agreement regarding Land Development and
TP.01.03/A.DIR.3424/2016        dan       nomor                 Management number TP.01.03/A.DIR.3424/2016
003/SET/PJ.3.2016 tanggal 30 Maret 2016.                        and number 003/SET/PJ.3.2016 dated March 30,
Pengubahan #02 Perjanjian Kerja Sama Usaha                      2016. Amendment #02 to the Business Cooperation
mengenai Pengembangan dan Pengelolaan Tanah                     Agreement regarding Land Development and
nomor TP.01.03/A.DIR.00304/2020 dan nomor                       Management number TP.01.03/A.DIR.00304/2020
005/DU/PJ.3.2020    tanggal 17     Maret   2020.                and number 005/DU/PJ.3.2020 dated March 17,
Pengubahan #03 Perjanjian Kerja Sama Usaha                      2020. Amendment #03 to the Business Cooperation
mengenai Pengembangan dan Pengelolaan Tanah                     Agreement regarding Land Development and
nomor TP.01.03/A.DIR/01524/2021 dan nomor                       Management number TP.01.03/A.DIR/01524/2021
019/DU/PJ.12.2021.                                              and number 019/DU/PJ.12.2021.

KSO - PT Wijaya Karya (Persero) Tbk - PT Wijaya                 KSO - PT Wijaya Karya (Persero) Tbk - PT
Karya Realty – (“WIKA-WR Laswi”)                                Wijaya Karya Realty (“WIKA-WR Laswi”)
KSO Perusahaan dengan WIKA Realty merupakan                     The Company's KSO with WIKA Realty is a Joint
Ventura Bersama yang didirikan berdasarkan                      Venture established based on the Joint Operation
Perjanjian   Kerja   Sama    Operasi     Nomor:                 Agreement Number TP.01.03/A.DIR.4359/2018 and
TP.01.03/A.DIR.4359/2018      dan        Nomor:                 Number: HK.02.09/A.DIR.WR.0965/2018 dated
HK.02.09/A.DIR.WR.0965/2018 tanggal 16 Maret                    March 16, 2018.
2018.

KSO WIKA-WR Laswi didirikan berdasarkan                         KSO WIKA-WR Laswi was established based on
kebutuhan untuk mengelola Kerja Sama Usaha                      the need to manage the Business Cooperation
("KSU") antara PT Kereta Api Indonesia (Persero)                ("KSU") between PT Kereta Api Indonesia (Persero)
dan WIKA-WR Laswi dalam rangka pemanfaatan                      and WIKA-WR Laswi for the utilization of land
lahan milik PT Kereta Api Indonesia (Persero) di                owned by PT Kereta Api Indonesia (Persero) in the
lokasi Laswi, Bandung.                                          Laswi area of Bandung.

KSO - PT Wijaya Karya (Persero) Tbk - PT Wijaya                 KSO - PT Wijaya Karya (Persero) Tbk - PT
Karya Bangunan Gedung Tbk – RS Vertikal                         Wijaya Karya Bangunan Gedung Tbk – RS
Surabaya (“WIKA-WG RS Vertikal Surabaya”)                       Vertikal Surabaya (“WIKA-WG RS Vertikal
                                                                Surabaya”)
Pada tanggal 25 Oktober 2022, Perusahaan dan                    On October 25, 2022, the Company and WIKA
WIKA Gedung melakukan perjanjian kerja sama                     Gedung entered into a business cooperation
usaha berdasarkan perjanjian kerja sama Operasi                 agreement based on operational cooperation
No. 001/KSO-RSUPTV/X/2022.                                      Agreement No. 001/KSO-RSUPTV/X/2022.

KSO WIKA-WG RS Vertikal Surabaya bergerak                       KSO WIKA-WG RS Vertical Surabaya is engaged in
dalam penunjukan penyedia jasa untuk pengadaan                  the appointment of service providers for the
pekerjaan konstruksi fisik dan bangun RS UPT                    procurement of physical construction work and the
Vertikal Surabaya.                                              construction of the RS UPT Vertikal Surabaya.

KSO - PT Wijaya Karya (Persero) Tbk - PT Wijaya                 KSO - PT Wijaya Karya (Persero) Tbk - PT
Karya Bangunan Gedung Tbk – Paket 1 UGM                         Wijaya Karya Bangunan Gedung Tbk – Paket 1
(“WIKA-WG Paket 1 UGM”)                                         UGM (“WIKA-WG Paket 1 UGM”)
Pada tanggal 19 November 2020, Perusahaan dan                   On November 19, 2020, the Company and WIKA
WIKA Gedung melakukan perjanjian kerja sama                     Gedung entered into a business cooperation
usaha berdasarkan perjanjian kerja sama Operasi                 agreement based on operational cooperation
No. 19.001/XI/PPK-PIU/UGM/2020.                                 Agreement No. 19.001/XI/PPK-PIU/UGM/2020.


                                                           16

Page 26
PT WIJAYA KARYA (PERSERO) Tbk                                               PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                         AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                      NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                  FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                      For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                               June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                             And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                            Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                          (In Thousand Rupiah, unless Otherwise Stated)
KSO WIKA-WG Paket 1 UGM bergerak dalam tender                   KSO WIKA-WG Paket 1 UGM is engaged in is
pekerjaan Paket 1 pembangunan SGLC dan ERIC                     engagedin tender for Package 1 construction work
Universitas Gadjah Mada.                                        for SGLC and ERIC at Gadjah Mada University.


KSO - PT Wijaya Karya (Persero) Tbk - PT Wijaya                 KSO - PT Wijaya Karya (Persero) Tbk - PT
Karya Bangunan Gedung Tbk – Gedung 1 dan 2                      Wijaya Karya Bangunan Gedung Tbk – Gedung
ITB (“WIKA-WG Gedung 1 dan 2 ITB”)                              1 dan 2 ITB (“WIKA-WG Gedung 1 and 2 ITB”)
Pada 18 Oktober 2021, Perusahaan dan WIKA                       On October 18, 2021, the Company and WIKA
Gedung melakukan Kesepakatan Kerja Sama                         Gedung entered into an Operational Cooperation
Operasi dengan No. PS.01.03/F.DPSR.00669/2021                   Agreement with No. PS.01.03/F.DPSR.00669/2021
dan telah diubah berdasarkan Amendemen Surat                    and was amended by Amendment to Operational
Perjanjian Kerja Sama Operasi (KSO) No.                         Cooperation           Agreement           (KSO)
PS.01.03/A.DIR.WG.3644/2022 tanggal 25 April                    No. PS.01.03/A.DIR.WG.3644/2022 dated April 25,
2022. Kerja sama usaha yang dilakukan                           2022. Business cooperation carried out based on
berdasarkan Perjanjian Kerja Sama Usaha (PKSU)                  Business Cooperation Agreement (PKSU) No.
No. 0929/LUJ/ DIPA/PERJ/2022 terakhir diubah                    0929/LUJ/ DIPA/PERJ/2022 last amended by
dengan     PKSU      No.    0929.ADD.1/LUJ/DIPA/                PKSU No. 0929.ADD.1/LUJ/DIPA/ PERJ/2022
PERJ/2022 tanggal 12 Agustus 2022.                              dated August 12, 2022

KSO WIKA-WG Gedung 1 dan 2 ITB bergerak dalam                   KSO WIKA-WG Gedung 1 and 2 ITB is engaged in
bidang pembangunan Gedung 1 dan 2 ITB                           the construction of Buildings 1 and 2 of the ITB
Innovation Park (IIP) Bandung Teknopolis (SBSN                  Innovation Park (IIP) Bandung Teknopolis (SBSN
ITB).                                                           ITB).

KSO - PT Wijaya Karya (Persero) Tbk - PT Wijaya                 KSO - PT Wijaya Karya (Persero) Tbk - PT
Karya Bangunan Gedung Tbk – Hotel Domestik 3                    Wijaya Karya Bangunan Gedung Tbk - Hotel
(“WIKA-WG Hotel Domestik 3”)                                    Domestik 3 (“WIKA-WG Hotel Domestik 3”)
Pada tanggal 2 Mei 2019, Perusahaan dan WIKA                    On May 2, 2019, the Company and WIKA Gedung
Gedung melakukan perjanjian kerja sama usaha                    entered into a business cooperation agreement
berdasarkan Perjanjian Kerja Sama Usaha (PKSU)                  based on Business Cooperation Agreement (PKSU)
No. PJJ.14.10.00/05/2019/0154 terakhir diubah                   No. PJJ.14.10.00/05/2019/0154 was last amended
dengan PKSU No. PJJ.14.10/00/08/2022/A.0400                     by PKSU No. PJJ.14.10/00/08/2022/A.0400 dated
tanggal 22 Agustus 2022.                                        August 22, 2022.

KSO WIKA-WG Hotel Domestik 3 bergerak dalam                     KSO WIKA-WG Hotel Domestik 3 is engaged in the
pembangunan hotel domestik terminal 3 BSH                       construction of a domestic hotel terminal at BSH
Bandara Soekarno-Hatta.                                         Terminal 3, Soekarno-Hatta Airport.

KSO - PT Wijaya Karya (Persero) Tbk - PT Wijaya                 KSO - PT Wijaya Karya (Persero) Tbk - PT
Karya Bangunan Gedung Tbk – RS TNI-AD                           Wijaya Karya Bangunan Gedung Tbk – RS TNI-
(“WIKA-WG RS TNI-AD”)                                           AD (“WIKA-WG RS TNI-AD”)
Pada tanggal 26 Januari 2021, Perusahaan dan                    On January 26, 2021, the Company and WIKA
WIKA Gedung melakukan perjanjian kerja sama                     Gedung. Entered into a business cooperation
usaha berdasarkan Perjanjian Kerja Sama Usaha                   agreement. Business cooperation undertaken under
(PKSU) No. 001/KSO/WIKA-WG/RMD-SBSN/I/2021                      the Cooperation Agreement (PKSU) No. 001/KSO/
terakhir diubah dengan PKSU No. 001/ADD1-                       WIKA-WG/RMD-SBSN/I/2021 as amended with
KSO/WIKA-WG/RMD-SBSN/VI/2021 tanggal 25 Juni                    PKSU No. 001/ADD1-KSO/WIKAWG/RMD-SBSN/
2021.                                                           VI/2021 dated June 25, 2021.

KSO WIKA-WG RS TNI-AD bergerak                    dalam         KSO WIKA-WG RS TNI-AD is engaged in building
pembangunan rumah dinas prajurit TNI-AD.                        official residences for TNI-AD soldiers.




                                                           17

Page 27
PT WIJAYA KARYA (PERSERO) Tbk                                                PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                          AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                       NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                   FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                       For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                              And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                             Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                           (In Thousand Rupiah, unless Otherwise Stated)
KSO - PT Wijaya Karya (Persero) Tbk - PT Wijaya                 KSO - PT Wijaya Karya (Persero) Tbk - PT
Karya Bangunan Gedung Tbk – Paket 3 UGM                         Wijaya Karya Bangunan Gedung Tbk – Paket 3
(“WIKA-WG Paket 3 UGM”)                                         UGM (“WIKA-WG Paket 3 UGM”)
Pada tanggal 3 Oktober 2019, Perusahaan dan                     On October 3, 2019, the Company and WIKA
WIKA Gedung melakukan perjanjian kerja sama                     Gedung entered into a business cooperation
usaha berdasarkan Perjanjian Kerja Sama Usaha                   agreement based on Business Cooperation
(PKSU)     No.      001/KSO/WIKA-WG//PKT3-UGM/                  Agreement (PKSU) No. 001/KSO/WIKA-WG//PKT3-
X/2019     terakhir     diubah  dengan    PKSU                  UGM/X/2019 last amended by PKSU No.
No. 08.001/X/PPK-PIU/UGM/2019 tanggal 8 Oktober                 08.001/X/PPK-PIU/UGM/2019 dated October 8,
2019.                                                           2019.

KSO WIKA-WG Paket 3 UGM bergerak dalam tender                   KSO WIKA-WG Paket 3 UGM is engaged in
pekerjaan Paket 3 pembangunan AGLC, ASLC, dan                   tenders for Package 3 work for the construction of
IFFLC Universitas Gadjah Mada.                                  AGLC, ASLC, and IFFLC at Gadjah Mada
                                                                University.

KSO - PT Wijaya Karya (Persero) Tbk - PT Wijaya                 KSO - PT Wijaya Karya (Persero) Tbk - PT
Karya Bangunan Gedung Tbk – BI Papua                            Wijaya Karya Bangunan Gedung Tbk – BI Papua
Pada tanggal 31 Agustus 2023, Perusahaan dan                    On August 31, 2023, the Company and WIKA
WIKA Gedung melakukan perjanjian Kerja Sama                     Gedung entered into a Joint Operation Agreement
Operasi    (KSO)     NO.      TP.02.01/A.DIR.WG.                (KSO) NO. TP.02.01/A.DIR.WG. 05287/2023, and
05287/2023, dan N. TP.01.03/ E.BO.00983/2023.                   N. TP.01.03/ E.BO.00983/2023.

KSO WIKA-WG BI Papua bergerak dalam Pekerjaan                   KSO WIKA-WG BI Papua is the construction of the
pembangunan gedung kantor perwakilan Bank                       Bank Indonesia representative office building for
Indonesia Provinsi Papua Barat.                                 West Papua Province.

KSO – PT Wijaya Karya (Persero) Tbk – PT                        KSO – PT Wijaya Karya (Persero) Tbk – PT
Wijaya Karya Bangunan Gedung Tbk – BMKG                         Wijaya Karya Bangunan Gedung Tbk – BMKG
Pada tanggal 31 Januari 2024, Perusahaan dan                    On January 31, 2024, the Company and WIKA
WIKA Gedung melakukan perjanjian kerja sama                     Gedung entered into a Joint Operation Agreement
usaha berdasarkan Perjanjian Kerja Sama Usaha                   (KSO) No.005/Contract.IOSDB/IDRIP-BMKG/2024.
(PKSU) No.005/Contract.IOSDB/IDRIP-BMKG/2024.                   KSO WG-WIKA is engaged in tendering for
KSO WG-WIKA bergerak dalam tender Paket                         Operational System Development Construction
Pekerjaan Konstruksi Pengembangan Sistem                        Work Packages INATEWS (Jakarta and Bali
Operasional INATEWS (Gedung Jakarta dan Bali).                  buildings).

KSO – Paket III – PT Wijaya Karya (Persero) Tbk –               KSO – Paket III – PT Wijaya Karya (Persero) Tbk
PT Wijaya Karya Rekayasa Konstruksi                             – PT Wijaya Karya Rekayasa Konstruksi
Berdasarkan amandemen ke-12 dan penegasan                       Based on the 12th amendment and the
kembali perjanjian internal konsorsium antara                   reaffirmation of the internal consortium agreement
Perusahaan, WIKA RK dan PT Wahana Idea Cipta                    between the Company, WIKA RK, and PT Wahana
(WIC) yang sudah ditandatangani oleh semua pihak                Idea Cipta (WIC), which was signed by all parties
pada tanggal 20 Mei 2024, WIC tidak lagi mengambil              on May 20, 2024, WIC is no longer participating in
bagian dalam kerja sama pelaksanaan pekerjaan                   the collaboration within this consortium. As a result,
dalam konsorsium ini, sehingga total penyertaan                 the total participation for the Company and WIKA
Perusahaan dan WIKA RK di KSO Paket 3 menjadi                   RK in KSO Paket 3 now stands at 100%.
sebesar 100%.

KSO - PT Wijaya Karya (Persero) Tbk - PT Wijaya                 KSO - PT Wijaya Karya (Persero) Tbk - PT
Karya Beton Tbk                                                 Wijaya Karya Beton Tbk
Pada tanggal 30 Mei 2025, telah ditandatangani                  On May 30, 2025, a Joint Operation Agreement
perjanjian Kerja Sama Operasi (KSO) No.                         (KSO) No. PS.03.03/B.Infra 1.00014/2025 was
PS.03.03/B.Infra 1.00014/2025 antara Perusahaan                 signed between the Company and PT Wijaya Karya
dan PT Wijaya Karya Beton Tbk (WIKA Beton).                     Beton Tbk (WIKA Beton).


                                                           18

Page 28
PT WIJAYA KARYA (PERSERO) Tbk                                               PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                         AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                      NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                  FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                       For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                              And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                             Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                           (In Thousand Rupiah, unless Otherwise Stated)
KSO ini diberi nama KSO WIKA – WITON, yang                      KSO WIKA – WITON is engaged to carry out
dibentuk untuk melaksanakan pekerjaan konstruksi                construction work for handling land movement on
Penanganan Pergerakan Tanah pada Jalan Tol                      the Cileunyi – Sumedang – Dawuan (Cisumdawu)
Cileunyi – Sumedang – Dawuan (Cisumdawu) KM                     KM 177 Toll Road, Bojongtotor.
177, Bojongtotor.

Kepemilikan Tidak Langsung                                      Indirect Ownership
PT Wijaya Karya Komponen Beton (“WIKA                           PT Wijaya Karya Komponen Beton (“WIKA
KOBE”)                                                          KOBE”)
Akta tersebut mengalami perubahan terakhir diubah               The deed was last amended by Notarial Deed No. 6
berdasarkan Akta No. 6 tanggal 7 Oktober 2024,                  dated October 7, 2024, drawn up before Tjhong
dibuat di hadapan Tjhong Sendrawan, S.H., M.Kn.                 Sendrawan, S.H., M.Kn. A Notary in Jakarta,
Notaris yang berkedudukan di Jakarta mengenai                   concerning changes in share ownership, as has
perubahan kepemilikan saham, sebagaimana telah                  obtained approval from the Minister of Law and
memperoleh persetujuan Menteri Hukum dan Hak                    Human      Rights     of  the     Republic    of
Asasi Manusia Republik Indonesia No. AHU-                       Indonesia No. AHU-AH.01.09-0260537 of 2024
AH.01.09-0260537 Tahun 2024 pada tanggal 8                      dated October 8, 2024.
Oktober 2024.

PT Wijaya Karya Krakatau Beton (“WIKA Kraton”)                  PT Wijaya Karya Krakatau Beton (“WIKA
                                                                Kraton”)
WIKA Kraton didirikan berdasarkan Akta Notaris No.              WIKA Kraton was established based on Notarial
16, pada tanggal 16 Desember 2013 dari Indrajati                Deed No. 16 dated December 16, 2013 of Indrajati
Tandjung, S.H. Akta pendirian ini disahkan oleh                 Tandjung, S.H. The deed of establishment was
Menteri Kehakiman Republik Indonesia dalam Surat                approved by the Minister of Justice of the Republic
Keputusan No. AHU 02372.AH.01.01 Tahun 2014                     Indonesia under Decision Letter No. AHU-
tertanggal 17 Januari 2014.                                     02372.AH.01.01 Year 2014 dated January 17,
                                                                2014.

PT Citra Lautan Teduh (“CLT”)                                   PT Citra Lautan Teduh (“CLT”)
CLT didirikan berdasarkan Akta Notaris No. 24                   CLT was established based on Notarial Deed No.
tanggal   29    Oktober    1994     dari Nurhayati              24 dated October 29, 1994 of Nurhayati
Suryasumirat, S.H., Akta pendirian ini disahkan oleh            Suryasumirat, S.H., The deed of establishment was
Menteri Kehakiman Republik Indonesia dalam Surat                approved by the Minister of Justice of the Republic
Keputusan No. C2-5921.HT.01.01.TH.95 tertanggal                 Indonesia   under     Decision     Letter   No.C2-
11 Mei 1995.                                                    5921.HT.01.01.TH.95 dated May 11, 1995.

PT Wijaya Karya Pracetak Gedung (“WIKA                          PT Wijaya Karya Pracetak Gedung (“WIKA
Pracetak Gedung”)                                               Pracetak Gedung”)
WIKA Pracetak Gedung didirikan berdasarkan Akta                 WIKA Pracetak Gedung was established based on
Notaris No. 142 tanggal 23 Desember 2016 dari Sri               Notarial Deed No. 142 dated December 23, 2016 of
Ismiyati, S.H., M.Kn. Akta pendirian ini disahkan oleh          Sri Ismiyati, S.H., M.Kn. The Deed of establishment
Menteri Kehakiman Republik Indonesia dalam Surat                was approved by the Minister of Justice of the
Keputusan No. AHU-0001918.AH.01.01 tertanggal                   Republic Indonesia        under Decision Letter
17 Januari 2017.                                                No. AHU-0001918.AH.01.01 dated January 17,
                                                                2017.

PT Wege Solusi Proklamasi (“WEGE SP”)                           PT Wege Solusi Proklamasi (“WEGE SP”)
WEGE SP didirikan di Jakarta dengan Akta                        WEGE SP was established in Jakarta based on
Perusahaan Terbatas PT Wege Solusi Proklamasi                   Limited Liability Company Deed No. 85 dated May
No. 85 tanggal 28 Mei 2019, dibuat di hadapan                   28, 2019, made in the presence of Fathiah Helmi,
Fathiah Helmi, S.H., Notaris di Jakarta.                        S.H., Notary in Jakarta.

PT Makassar Coastal City (“MCC”)                                PT Makassar Coastal City (“MCC”)
Berdasarkan Akta Pernyataan Keputusan Para                      Based on the Deed of Statement of Decision of
Pemegang Saham milik PT Makassar Coastal City                   Shareholders of PT Makassar Coastal City No. 100

                                                           19

Page 29
PT WIJAYA KARYA (PERSERO) Tbk                                                PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                          AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                       NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                   FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                       For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                              And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                             Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                           (In Thousand Rupiah, unless Otherwise Stated)
No. 100 tanggal 20 September 2024, dari Notaris                 dated September 20, 2024, from Notary Ryan
Ryan Bayu-Siregar, S.H., M.Kn., yang telah                      Bayu-Siregar, S.H., M.Kn., who has obtained a
memperoleh surat keputusan Menteri hukum dan                    decree of the Minister of Law and Human Rights of
Hak Asasi Manusia Republik Indonesia No. AHU-                   the    Republic     of    Indonesia   No.      AHU-
0069337.AH.01.02 Tahun 2024 tanggal 30 Oktober                  0069337.AH.01.02 of 2024 dated October 30, 2024
2024 tentang Persetujuan Perubahan Anggaran                     concerning Approval of Amendments to the Articles
Dasar Perseroan Terbatas MCC dan Penerimaan                     of Association of the Limited Liability Company
Pemberitahuan Anggaran Dasar MCC dari Menteri                   MCC and Receipt of Notification of the Articles of
Hukum dan Hak Asasi Manusia Republik Indonesia                  Association of MCC from the Minister of Law and
dalam Surat No. AHU-AH.01.03.0205591 tanggal                    Human Rights of the Republic of Indonesia in Letter
30 Oktober 2024. Para Pemegang Saham MCC                        No. AHU-AH.01.03.0205591 dated October 30,
sehubungan dengan adanya pengurangan modal                      2024. MCC Shareholders, in connection with the
ditempatkan dan disetor, sehingga kepemilikan                   reduction in issued and paid-up capital, resulting in
saham WIKA Realty adalah 99,31%.                                WIKA Realty’s share ownership becoming 99.31%.

PT Kurnia Realty Jaya (“KRJ”)                                   PT Kurnia Realty Jaya (“KRJ”)
KRJ didirikan berdasarkan Akta No. 1 tanggal 14                 KRJ was established based on Deed No. 1 dated
Juni 2000 dari Sri Rahayu Sedyono M. S.H., dan                  June 14, 2000, drawn up before Sri Rahayu
telah disahkan oleh Menteri Kehakiman Republik                  Sedyono M. S.H., and has been approved by the
Indonesia dalam Surat Keputusan No. C-18832.HT.                 Minister of Justice of the Republic Indonesia in his
01.01 Tahun 2001 tanggal 6 November 2001.                       Decision                                      Letter
                                                                No. C-18832.HT.01.01 Year 2001 dated November
                                                                6, 2001.

PT Senggigi Pratama Internasional (“SPI”)                       PT Senggigi Pratama Internasional (“SPI”)
Berdasarkan Keputusan Pemegang Saham Di Luar                    Based on the Shareholders’ Resolution Outside
Rapat WIKA Realty dalam Akta No. 12 tanggal 13                  WIKA Realty's Meeting in Deed No. 12 dated June
Juni 2022 dari Ryan Bayu Candra, S.H., M.Kn,                    13, 2022 of Ryan Bayu Candra, S.H., M.Kn, Notary
Notaris di Jakarta yang telah memperoleh                        in Jakarta which was approved and ratified by the
persetujuan dan disahkan oleh Menteri Hukum dan                 Minister of Law and Human Rights of the Republic
Hak Asasi Manusia Republik Indonesia dengan                     of Indonesia with Decree No. AHU-AH.01.09-
Surat Keputusan No. AHU-AH.01.09-0000198                        0000198 dated April 1, 2022, agree to transfer the
tanggal 1 April 2022, menyetujui pengalihan hak atas            rights of WIKA Realty's shares in SPI of 15 shares
saham milik WIKA Realty di SPI sebanyak                         with a total nominal value of Rp15,000.
15 lembar saham dengan nominal seluruhnya
sebesar Rp15.000.

Persentase penyertaan WIKA Realty di SPI berubah                The percentage of WIKA Realty in SPI’s investment
dari 100% menjadi 99,90%.                                       changed from 100% to 99.90%.

PT Indo Benhil Karunia Jaya (”IBKJ”)                            PT Indo Benhil Karunia Jaya (“IBKJ”)
Berdasarkan Akta No. 33 tanggal 21 April 2025 yang              Based on Deed No. 33 dated April 21, 2025, drawn
dibuat di hadapan Mala Mukti, S.H., LL.M., Notaris di           up before Mala Mukti, S.H., LL.M., Notary in
Jakarta, IBKJ telah menyetujui hibah atau                       Jakarta, IBKJ approved the grant or transfer of the
pengalihan seluruh kepemilikan saham milik                      entire share ownership held by Mitsubishi Estate
Mitsubishi Estate Co., Ltd. kepada KRJ. Perubahan               Co., Ltd. to KRJ. Such change has been
tersebut     telah     memperoleh       Penerimaan              acknowledged through the Receipt of Notification of
Pemberitahuan Perubahan Data Perseroan dari                     Changes in Company Data from the Minister of Law
Menteri Hukum Republik Indonesia melalui Surat No.              of the Republic of Indonesia as stated in Letter No.
AHU-AH.01.09-0200722 tanggal 23 April 2025,                     AHU-AH.01.09-0200722 dated April 23, 2025,
terkait perubahan Direksi dan Dewan Komisaris                   concerning changes in the Board of Directors and
serta peralihan saham IBKJ. Dengan demikian,                    Board of Commissioners as well as the transfer of
komposisi pemegang saham IBKJ menjadi KRJ                       shares of IBKJ. Accordingly, the shareholder
dengan kepemilikan sebesar 100% atau sebanyak                   composition of IBKJ has become KRJ, holding
628.000 saham (nominal penuh) dengan nilai                      100% ownership or a total of 628,000 shares (full
nominal seluruhnya sebesar Rp628.000.000.                       amount) with an aggregate nominal value of

                                                           20

Page 30
PT WIJAYA KARYA (PERSERO) Tbk                                                PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                          AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                       NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                   FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                       For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                              And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                             Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                           (In Thousand Rupiah, unless Otherwise Stated)
                                                                Rp628,000,000.

Persentase penyertaan KRJ di IBKJ yang                          The ownership interest of KRJ in IBKJ, which was
sebelumnya diakui sebagai investasi pada entitas                previously recognized as an investment in an
asosiasi (Catatan 17) sebesar 30% menjadi investasi             associate (Notes 17) of 30%, has increased to
pada entitas anak sebesar 100%.                                 100% and recognized as an investment in a
                                                                subsidiary.

PT Wijaya Karya Aspal (“WKA”)                                   PT Wijaya Karya Aspal (“WKA”)
WKA didirikan berdasarkan Akta Notaris No. 7                    WKA was established based on Notarial Deed No.
tanggal 8 Februari 2017 dari Karin Christiana                   7 dated February 8, 2017 from Karin Christiana
Basoeki, S.H., Notaris di Jakarta. Akta Pendirian ini           Basoeki, S.H., Notary in Jakarta. This Deed of
telah memperoleh persetujuan dari Menteri                       Establishment has been approved by the Minister of
Kehakiman dan Hak Asasi Manusia Republik                        Justice and Human Rights of the Republic of
Indonesia berdasarkan Surat Keputusan No. AHU-                  Indonesia   based    on   Decree     No.    AHU-
0014909.AH.01.01.2017 tanggal 29 Maret 2017.                    0014909.AH.01.01.2017 dated March 29, 2017.

PT Wijaya Karya Industri Energi (“WINNER”)                      PT Wijaya Karya Industri Energi (“WINNER”)
Berdasarkan Akta No. 19 tanggal 19 Juni 2024,                   Based on Deed No. 19 dated June 19, 2024,
Winner mendapatkan tambahan peningkatan modal                   Winner received an additional capital injection of
sebesar Rp8.024.000. dari Perusahaan dengan nilai               Rp8,024,000 from the Company with a nominal
nominal Rp1.000 per saham, yang diambil bagian                  value of Rp1,000 per share, which was taken in its
seluruhnya oleh Perusahaan dalam bentuk Debt to                 entirety by the Company in the form of a Debt to
Equity Swap.                                                    Equity Swap.

Perusahaan dan entitas anak selanjutnya secara                  The Company and its subsidiaries hereinafter are
bersama-sama disebut sebagai “Grup”.                            collectively referred to as “the Group”.

2. Informasi Kebijakan Akuntansi Material                            2. Material Accounting Policies Information
2.a. Kepatuhan Terhadap Standar Akuntansi                       2.a. Compliance with the Financial Accounting
    Keuangan (SAK)                                                  Standards (SAK)
    Laporan keuangan konsolidasian telah disusun                    The consolidated financial statements were
    dan disajikan sesuai dengan Standar Akuntansi                   prepared and presented in accordance with
    Keuangan Indonesia yang meliputi Pernyataan                     Indonesian Financial Accounting Standards
    Standar Akuntansi Keuangan (PSAK) dan                           which include the Statement of Financial
    Interpretasi Standar Akuntansi Keuangan (ISAK)                  Accounting Standards (PSAK) and Interpretation
    yang diterbitkan oleh Dewan Standar Akuntansi                   of Financial Accounting Standards (ISAK)
    Keuangan – Ikatan Akuntan Indonesia (DSAK –                     issued by the Financial Accounting Standard
    IAI), serta peraturan Pasar Modal yang berlaku                  Board – Indonesian Institute of Accountant
    antara     lain    Peraturan    Otoritas   Jasa                 (DSAK – IAI), and regulations in the Capital
    Keuangan/Badan Pengawas Pasar Modal dan                         Market include Regulations of Financial
    Lembaga Keuangan (OJK/Bapepam-LK) No.                           Services Authority/ Capital Market and
    VIII.G.7 tentang pedoman penyajian laporan                      Supervisory Board and Financial Institution
    keuangan, keputusan Ketua Bapepam-LK No.                        (OJK/Bapepam-LK) No. VIII.G.7 regarding
    KEP-347/BL/2012       tentang   penyajian   dan                 guidelines for the presentation of financial
    pengungkapan laporan keuangan emiten atau                       statements, decree of Chairman of Bapepam-LK
    perusahaan publik, sepanjang tidak bertentangan                 No. KEP-347/BL/2012 regarding presentation
    dengan suatu PSAK atau ISAK.                                    and disclosure of financial statements of the
                                                                    issuer or public company, to the extent these do
                                                                    not conflict with PSAK or ISAK.

2.b. Dasar Pengukuran dan Penyusunan Laporan                    2.b. Basis of Preparation of the Consolidated
    Keuangan Konsolidasian                                          Financial Statements
    Laporan keuangan konsolidasian disusun                          The consolidated financial statements have
    berdasarkan asumsi kelangsungan usaha serta                     been prepared on the going concern assumption
    atas dasar akrual, kecuali laporan arus kas                     and on an accrual basis, except for the

                                                           21

Page 31
PT WIJAYA KARYA (PERSERO) Tbk                                                 PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                           AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                    FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                         For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                  June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                                And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                               Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                             (In Thousand Rupiah, unless Otherwise Stated)
    konsolidasian yang menggunakan dasar kas.                      consolidated statements of cash flows using the
    Dasar pengukuran dalam penyusunan laporan                      cash basis. The basis of measurement in
    keuangan konsolidasian ini adalah konsep biaya                 preparation of these consolidated financial
    perolehan, kecuali beberapa akun tertentu yang                 statements is the historical costs, except for
    didasarkan pengukuran lain sebagaimana                         certain accounts which had been prepared on
    dijelaskan dalam kebijakan akuntansi masing-                   the basis of other measurements as described
    masing akun tersebut. Biaya perolehan umumnya                  in their respective policies. Historical cost is
    didasarkan pada nilai wajar imbalan yang                       generally based on the fair value of the
    diserahkan dalam pemerolehan aset.                             consideration given in exchange for assets.

    Laporan arus kas konsolidasian disajikan dengan                The consolidated statements of cash flows are
    metode langsung dengan mengelompokkan arus                     prepared using the direct method by classifying
    kas dalam aktivitas operasi, investasi dan                     cash flows into operating, investing and
    pendanaan.                                                     financing activities.

    Mata uang penyajian yang digunakan dalam                       The presentation currency used in the
    penyusunan laporan keuangan konsolidasian ini                  preparation of the consolidated financial
    adalah Rupiah yang merupakan mata uang                         statements is Rupiah which is the functional
    fungsional Perusahaan. Setiap entitas di dalam                 currency of the Company. Each entity in the
    Grup menetapkan mata uang fungsional sendiri                   Group determines its own functional currency
    dan unsur-unsur dalam laporan keuangan dari                    and items included in the financial statements of
    setiap entitas diukur berdasarkan mata uang                    each entity are measured using that functional
    fungsional tersebut.                                           currency.

2.c. Standar Akuntansi Keuangan yang Berlaku                    2.c. Effective Financial Accounting Standards
    Efektif
     i. Pernyataan Standar Akuntansi Keuangan                      i.    Statements of Financial Accounting
        (“PSAK”) yang berlaku efektif untuk tahun                        Standard (“PSAK”) effective for the year
        buku yang dimulai pada atau setelah                              beginning on or after January 1, 2025.
        tanggal 1 Januari 2025.
        Standar baru dan amendemen atas standar                         New Standard and amendments to standards
        yang berlaku efektif untuk periode yang                         which effective for periods beginning on or
        dimulai pada atau setelah 1 Januari 2025,                       after January 1, 2025, with early adoption is
        dengan penerapan dini diperkenankan yaitu:                      permitted, are as follows:
        • Amendemen PSAK 221: Pengaruh                                  • Amendments         PSAK    221:    Foreign
            Perubahan Kurs Valuta Asing tentang                            Exchange Rate regarding Lack of
            Kekurangan Ketertukaran;                                       Exchangeability;
        • PSAK 117: Kontrak Asuransi; dan                               • PSAK 117: Insurance Contract; and
        • Amendemen        PSAK     117:  Kontrak                       • Amendments PSAK 117: Insurance
            Asuransi tentang Penerapan Awal PSAK                           Contract regarding Initial Application of
            117 dan PSAK 109 - Informasi                                   PSAK 117 and PSAK 109 - Comparative
            Komparatif.                                                    Information.

        Beberapa PSAK juga diamendemen yang                             Several PSAKs were also amended as
        merupakan       amendemen     konsekuensial                     consequential amendments due to the
        karena berlakunya PSAK 117: Kontrak                             enactment of PSAK 117: Insurance
        Asuransi, yaitu:                                                Contracts, as follows:
        • PSAK 103: Kombinasi Bisnis;                                   • PSAK 103: Business Combinations;
        • PSAK 105: Aset Tidak Lancar yang                              • PSAK 105: Non-Current Assets Held for
           Dikuasai untuk Dijual dan Operasi yang                          Sale and Discontinued Operations;
           Dihentikan;
        • PSAK       107:   Instrumen   Keuangan:                       • PSAK     107:  Financial    Instruments:
           Pengungkapan;                                                  Disclosures;
        • PSAK 109: Instrumen Keuangan;                                 • PSAK 109: Financial Instruments;
        • PSAK 115: Pendapatan dari Kontrak                             • PSAK 115: Income from Contracts with
           dengan Pelanggan;                                              Customers;
                                                           22

Page 32
PT WIJAYA KARYA (PERSERO) Tbk                                            PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                      AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                   NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                               FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                    For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                             June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                           And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                          Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                        (In Thousand Rupiah, unless Otherwise Stated)
        •   PSAK       201:    Penyajian    Laporan               • PSAK 201: Presentation of Financial
            Keuangan;                                               Statements;
        •   PSAK 207: Laporan Arus Kas;                           • PSAK 207: Statement of Cash Flows;
        •   PSAK 216: Aset Tetap;                                 • PSAK 216: Fixed Assets;
        •   PSAK 219: Imbalan Kerja;                              • PSAK 219: Employee Benefits
        •   PSAK 228: Investasi pada Entitas                      • PSAK 228: Investment in Associated
            Asosiasi dan Ventura Bersama;                           Entities and Joint Ventures;
        •   PSAK      232:   Instrumen    Keuangan:               • PSAK        232:   Financial   Instruments:
            Penyajian;                                              Presentation;
        •   PSAK 236: Penurunan Nilai Aset;                       • PSAK 236: Impairment of Assets;
        •   PSAK 237: Provisi, Liabilitas Kontijensi              • PSAK       237:   Provisions,    Contingent
            dan Aset Kontijensi;                                    Liabilities and Contingent Assets;
        •   PSAK 238: Aset Takberwujud; dan                       • PSAK 238: Intangible Assets; and
        •   PSAK 240: Properti Investasi.                         • PSAK 240: Investment Property.

        Implementasi standar-standar tersebut tidak               The implementation of the above standards
        memiliki dampak yang signifikan terhadap                  had no significant effect on the amounts
        jumlah yang dilaporkan di periode berjalan                reported for the current period or prior
        atau tahun sebelumnya.                                    financial year.

    ii. PSAK yang berlaku efektif untuk tahun                   ii. PSAK effective for periods beginning on or
        buku yang dimulai pada atau setelah                         after January 1, 2026 and January 1, 2027.
        tanggal 1 Januari 2026 dan 1 Januari
        2027.
        Amendemen dan revisi atas standar yang                    Amendment and revisions to standards which
        berlaku efektif untuk periode yang dimulai                are effective for periods beginning on or after
        pada atau setelah 1 Januari 2026, dengan                  January 1, 2026, with early adoption is
        penerapan dini diperkenankan yaitu:                       permitted, are as follows:
        • Amendemen PSAK 109: Instrumen                           • Amendments PSAK 109 and PSAK 107
          Keuangan dan PSAK 107: Instrumen                          regarding Classification and Measurement
          Keuangan:      Pengungkapan      tentang                  of Financial Instruments;
          Klasifikasi dan Pengukuran Instrumen
          Keuangan;
        • Penyesuaian Tahunan PSAK 107, PSAK                      • Annual Improvements on PSAK 107,
          109, PSAK 110, dan PSAK 207; dan                          PSAK 109, PSAK 110, dan PSAK 207;
                                                                    and
        • Revisi PSAK 338: Kombinasi Bisnis                       • Revised     PSAK     338:     Business
          Entitas Sepengendali terkait ruang                        Combination of Entity Under Common
          lingkup   dan     penerapan metode                        Control regarding the scope and
          penyatuan kepemilikan.                                    application of the pooling of interests
                                                                    method.

        Standar baru, revisi dan amendemen serta                  New, revised and amendment of standards
        interpretasi atas standar yang berlaku efektif            and interpretation of standard which are
        untuk periode yang dimulai pada atau setelah              effective for periods beginning on or after
        1 Januari 2027, dengan penerapan dini                     January 1, 2027, with early adoption
        diperkenankan yaitu:                                      permitted, are as follows:
         • PSAK          118:      Penyajian     dan              • PSAK 118: Presentation and Disclosure in
             Pengungkapan         dalam      Laporan                Financial Statements;
             Keuangan;
         • PSAK 119: Entitas Anak tanpa                           • PSAK 119: Subsidiaries without Public
             Akuntabilitas Publik: Pengungkapan;                    Accountability: Disclosures;
         • Amandemen PSAK 119: Entitas Anak                       • Amendment PSAK 119: Subsidiaries
             tanpa        Akuntabilitas       Publik:               without Public Accountability: Disclosures;
             Pengungkapan;

                                                           23

Page 33
PT WIJAYA KARYA (PERSERO) Tbk                                                 PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                           AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                    FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                        For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                 June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                               And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                              Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                            (In Thousand Rupiah, unless Otherwise Stated)
        •    Revisi PSAK 401: Penyajian dan                           • Revised PSAK 401: Presentation and
             Pengungkapan        dalam    Laporan                       Disclosure    in      Sharia     Financial
             Keuangan Syariah;                                          Statements;
        •    ISAK     403:    Komponen    Laporan                     • ISAK 403: Components of Financial
             Keuangan Entitas Syariah Yang                              Reports of Sharia Entities That Apply SAK
             Menerapkan SAK Indonesia Untuk                             Indonesia for Private Entities and SAK
             Entitas Privat dan SAK Indonesia                           Indonesia for Micro, Small, and Medium
             Untuk Entitas Mikro, Kecil, dan                            Entities;
             Menengah;
        •    PSAK 413: Penurunan Nilai; dan                           • PSAK 413: Impairment; and
        •    PSAK 414: Penurunan Nilai Aset                           • PSAK 414: Impairment of Sharia Financial
             Keuangan Syariah bagi Entitas yang                         Assets for Entities Implementing SAK
             Menerapkan SAK Indonesia untuk                             Indonesia for Private Entities (SAK EP).
             Entitas Privat (SAK EP).

        Hingga tanggal laporan keuangan ini                               Until the date of the financial statements is
        diotorisasi, Grup masih melakukan evaluasi                        authorized, the Group is still evaluating the
        atas dampak potensial dari penerapan                              potential impact of the implementation
        standar baru dan amendemen atas standar                           those new standard and amendments to
        tersebut.                                                         standards.

2.d. Prinsip-prinsip Konsolidasi                                2.d. Principles of Consolidation
    Laporan keuangan konsolidasian mencakup                         The consolidated financial statements include the
    laporan keuangan Grup seperti disebutkan pada                   financial statements of the Group as described in
    Catatan 1.e.                                                    Note 1.e.

    Entitas anak adalah entitas yang dikendalikan                   A subsidiary is an entity controlled by the Group,
    oleh Grup, yakni Grup terekspos, atau memiliki                  where the Group is exposed, or has rights, to
    hak,     atas  imbal    hasil  variabel   dari                  variable returns from its involvement with the
    keterlibatannya dengan entitas dan memiliki                     entity and has the ability to affect those returns
    kemampuan untuk mempengaruhi imbal hasil                        through its current ability to direct the entity’s
    tersebut melalui kemampuan kini untuk                           relevant activities (power over the investee).
    mengarahkan aktivitas relevan dari entitas
    (kekuasaan atas investee).

    Keberadaan dan dampak dari hak suara                            The existence and effect of substantive potential
    potensial dimana Grup memiliki kemampuan                        voting rights over which the Group has the
    praktis untuk melaksanakan (yakni hak                           practical ability to exercise (i.e, substantive
    substantif) dipertimbangkan saat menilai apakah                 rights) are considered when assessing whether
    Grup mengendalikan entitas lain.                                the Group controls other entities.

    Laporan keuangan Grup mencakup hasil usaha,                     The Group’s financial statements incorporate the
    arus kas, aset dan liabilitas dari Grup dan                     results, cash flows, assets and liabilities of the
    seluruh entitas anak yang, secara langsung dan                  Group and all of its directly and indirectly
    tidak langsung, dikendalikan oleh Grup. Entitas                 controlled    subsidiaries.     Subsidiaries   are
    anak dikonsolidasikan sejak tanggal efektif                     consolidated from the effective date of
    akuisisi, yaitu tanggal dimana Grup secara efektif              acquisition, which is the date on which the Group
    memperoleh pengendalian atas bisnis yang                        effectively obtains control of the acquired
    diakuisisi,    sampai     tanggal   pengendalian                business, until that control ceases.
    berakhir.

    Entitas induk menyusun laporan keuangan                        A parent prepares consolidated financial
    konsolidasian dengan menggunakan kebijakan                     statements using uniform accounting policies for
    akuntansi yang sama untuk transaksi dan                        like transactions and other events in similar
    peristiwa lain dalam keadaan yang serupa.                      circumstances. All intragroup transactions,
    Seluruh transaksi, saldo penghasilan, beban,                   balances, income, expenses and cash flows
                                                           24

Page 34
PT WIJAYA KARYA (PERSERO) Tbk                                             PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                       AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                    NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                     For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                              June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                            And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                           Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                         (In Thousand Rupiah, unless Otherwise Stated)
    dan arus kas dalam intra kelompok usaha terkait             between entities within the Group are eliminated
    dengan transaksi antar entitas dalam kelompok               in full.
    usaha dieliminasi secara penuh.

    Grup mengatribusikan laba rugi dan setiap                   The Group attributed the profit or loss and each
    komponen dari penghasilan komprehensif lain                 component of other comprehensive income to
    kepada pemilik entitas induk dan kepentingan                the owners of the parent and non-controlling
    non pengendali meskipun hal tersebut                        interest even though this results in the non-
    mengakibatkan kepentingan non pengendali                    controlling interests having a deficit balance. The
    memiliki saldo defisit. Grup menyajikan                     Group presents non-controlling interest in equity
    kepentingan non pengendali di ekuitas dalam                 in the consolidated statement of financial
    laporan posisi keuangan konsolidasian, terpisah             position, separately from the equity of the owners
    dari ekuitas pemilik entitas induk.                         of the parent.

    Perubahan dalam bagian kepemilikan entitas                  Changes in the parent’s ownership interest in a
    induk     pada    entitas    anak    yang   tidak           subsidiary that do not result in a loss of control
    mengakibatkan hilangnya pengendalian adalah                 are equity transactions (which are transactions
    transaksi ekuitas (yaitu transaksi dengan pemilik           with owners in their capacity as owners). When
    dalam kapasitasnya sebagai pemilik). Ketika                 the proportion of equity held by non-controlling
    proporsi ekuitas yang dimiliki oleh kepentingan             interests changes, the Group adjusted the
    non pengendali berubah, Grup menyesuaikan                   carrying amounts of the controlling interest and
    jumlah tercatat kepentingan pengendali dan                  non-controlling interest to reflect the changes in
    kepentingan       non       pengendali     untuk            their relative interest in the subsidiaries. Any
    mencerminkan perubahan kepemilikan relatifnya               difference between the amount by which the non-
    dalam entitas anak. Selisih antara jumlah                   controlling interests are adjusted and the fair
    dimana       kepentingan       non     pengendali           value of the consideration paid or received is
    disesuaikan dan nilai wajar dari jumlah yang                recognised directly in equity and attributed to the
    diterima atau dibayarkan diakui langsung dalam              owners of the parent.
    ekuitas dan diatribusikan pada pemilik dari
    entitas induk.

    Jika Grup kehilangan pengendalian, maka Grup:               If- the Group loses control, the Group:
    (a) Menghentikan pengakuan aset (termasuk                     - Derecognizes the assets (including goodwill)
                                                                (a)
        goodwill) dan liabilitas entitas anak pada                    and liabilities of the subsidiary at their
        jumlah tercatatnya ketika pengendalian                        carrying amounts at the date when control is
        hilang;                                                       lost;
    (b) Menghentikan pengakuan jumlah tercatat                    - Derecognizes the carrying amount of any
                                                                (b)
        setiap kepentingan non pengendali pada                        non-controlling        interests   in     the
        entitas anak terdahulu ketika pengendalian                    former subsidiary at the date when
        hilang     (termasuk     setiap     komponen                   control is lost (including any components of
        penghasilan      komprehensif     lain   yang                 other comprehensive income attributable to
        diatribusikan     pada    kepentingan      non                them);
        pengendali);
    (c) Mengakui nilai wajar pembayaran yang                     - Recognizes the fair value of the
                                                                (c)
        diterima (jika ada) dari transaksi, peristiwa,              consideration received, if any, from the
        atau     keadaan      yang     mengakibatkan                transaction, event or circumstances that
        hilangnya pengendalian;                                     resulted in the loss of control;
    (d) Mengakui sisa investasi pada entitas anak                - Recognizes any investment retained in the
                                                                (d)
        terdahulu pada nilai wajarnya pada tanggal                  former subsidiary at fair value at the date
        hilangnya pengendalian;                                     when control is lost;
    (e) Mereklasifikasi     ke   laba    rugi,   atau            - Reclassifies to profit or loss, or transfer
                                                                (e)
        mengalihkan secara langsung ke saldo laba                   directly to retained earnings if required by
        jika disyaratkan oleh SAK lain, jumlah yang                 other SAK, the amount recognized in other
        diakui dalam penghasilan komprehensif lain                  comprehensive income in relation to the
        dalam kaitan dengan entitas anak;                           former subsidiary;
    (f) Mengakui       perbedaan      apapun     yang            - Recognizes any resulting difference as a
                                                                (f)

                                                           25

Page 35
PT WIJAYA KARYA (PERSERO) Tbk                                                     PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                               AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                            NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                        FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                             For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                      June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                                    And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                                   Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                                 (In Thousand Rupiah, unless Otherwise Stated)
        dihasilkan   sebagai   keuntungan      atau                      gain or loss attributable to the parent.
        kerugian dalam laba rugi yang diatribusikan
        kepada entitas induk.

2.e. Transaksi dengan Pihak-pihak Berelasi                      2.e. Transactions with Related Parties
     Pihak-pihak berelasi adalah orang atau entitas                  Related party represents a person or an entity
     yang terkait dengan entitas pelapor:                            that is related to the reporting entity:
     a) Orang atau anggota keluarga terdekat                        a) A person or a close member of that person’s
        mempunyai relasi dengan entitas pelapor                          family is related to a reporting entity if that
        jika orang tersebut:                                             person:
        i. Memiliki              pengendalian       atau                 i. Has control or joint control of the
               pengendalian bersama atas entitas                               reporting entity;
               pelapor;
        ii. Memiliki pengaruh signifikan atas entitas                    ii.Has significant influence over the
               pelapor; atau                                                reporting entity; or
        iii. Merupakan personil manajemen kunci                        iii. Is a member of the key management
               entitas pelapor atau entitas induk dari                      personnel of the reporting entity or of a
               entitas pelapor.                                             parent of the reporting entity.
    b) Suatu entitas berelasi dengan entitas                        b) One entity is related to the reporting entity if
        pelapor jika memenuhi salah satu hal                           it meets one of the following:
        berikut:
         i. Entitas dan entitas pelapor merupakan                    iv. i.     The entity and the reporting entity are
               anggota dari kelompok usaha yang                                 members of the same group (which
               sama (artinya entitas induk, entitas                             means that each parent, subsidiary and
               anak, dan sesama entitas anak saling                             fellow subsidiary is related to the others);
               berelasi dengan entitas lainnya);
         ii. Satu entitas merupakan entitas asosiasi                     ii.    One entity is an associate or joint
               atau ventura bersama dari entitas lain                           venture of the other entity (or an
               (atau entitas asosiasi atau ventura                              associate or joint venture of a member of
               bersama yang merupakan anggota                                   a group of which the other entity is a
               suatu kelompok usaha, di mana entitas                            member);
               lain tersebut adalah anggotanya);
         iii. Kedua entitas tersebut merupakan                           iii. Both entities are joint ventures of the
               ventura bersama dari pihak ketiga yang                         same third party;
               sama;
         iv. Satu        entitas   merupakan     ventura                 iv. One entity is a joint venture of a third
               bersama dari entitas ketiga dan entitas                       entity and the other entity is an associate
               lainnya adalah entitas asosiasi dari                          of the third entity;
               entitas ketiga;
         v. Entitas tersebut merupakan suatu                             v.  The entity a post-employment benefit
               program imbalan pascakerja untuk                              plan for the benefit of employees of
               imbalan kerja dari salah satu entitas                         either the reporting entity or an
               pelapor atau entitas yang terkait dengan                      entity        related         to        the
               entitas pelapor. Jika entitas pelapor                         reporting entity. If the reporting
               adalah entitas yang menyelenggarakan                          entity     is     itself    such      plan,
               program tersebut, maka entitas sponsor                        the sponsoring employers are also
               juga berelasi dengan entitas pelapor;                         related to the reporting entity;
         vi. Entitas       yang     dikendalikan    atau                 vi. The entity is controlled or jointly
               dikendalikan bersama oleh orang yang                          controlled by a person identified in (a);
               diidentifikasi dalam huruf (a);
         vii. Orang yang diidentifikasi dalam huruf                      vii. A person identified in (a)(i) has
               (a)(i) memiliki pengaruh signifikan atas                        significant influence over the entity or is
               entitas atau merupakan personel                                 a member of the key management
               manajemen kunci entitas (atau entitas                           personnel of the entity (or a parent of the
               induk dari entitas); atau                                       entity); or
         viii. Entitas, atau anggota dari kelompok di                    viii. The entity, or any members of a group of

                                                           26

Page 36
PT WIJAYA KARYA (PERSERO) Tbk                                                 PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                           AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                    FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                         For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                  June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                                And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                               Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                             (In Thousand Rupiah, unless Otherwise Stated)
             mana entitas merupakan bagian dari                             which it is a part, provides key
             kelompok tersebut, menyediakan jasa                            management personnel service to the
             personil manajemen kunci kepada                                reporting entity or to the parent of the
             entitas pelapor atau kepada entitas                            reporting entity.
             induk dari entitas pelapor.

    Entitas yang berelasi dengan pemerintah adalah                  A government-related entity is an entity that is
    entitas   yang     dikendalikan,  dikendalikan                  controlled, jointly controlled or significant
    bersama, atau dipengaruhi oleh pemerintah.                      influence by a government. Government refers
    Pemerintah mengacu pada pemerintah, instansi                    to government, government agencies and
    pemerintah dan badan yang serupa baik lokal,                    similar bodies whether local, national or
    nasional maupun internasional.                                  international.

2.f. Transaksi dan Saldo Mata Uang Asing                        2.f. Foreign Currency Transactions and Balances
     Dalam menyiapkan laporan keuangan, setiap                       In preparing the financial statements, each of the
     entitas di dalam Grup melakukan pencatatan                      entities within the Group keep records by using
     dengan menggunakan mata uang dari                               the currency of the primary economic
     lingkungan ekonomi utama di mana entitas                        environment in which the entity operates (“the
     beroperasi (“mata uang fungsional”). Mata uang                  functional currency”). The functional currency of
     fungsional Grup adalah Rupiah.                                  the Group is Rupiah.
                                                                                     2026                   2025
                                                                                      Rp                     Rp
    Poundsterling Inggris (GBP)                                                          23.594,04             22.665,78
    Euro Eropa (EUR)                                                                     20.360,31             19.753,26
    Dolar Amerika Serikat (USD)                                                          17.856,00             16.782,00
    Dolar Singapura (SGD)                                                                13.806,02             13.068,57
    Dolar Brunei (BND)                                                                   13.806,02             13.067,57
    Dolar Australia (AUD)                                                                12.311,73             11.254,86
    Dirham Uni Emirat Arab (AED)                                                          4.882,27              4.545,52
    Ringgit Malaysia (MYR)                                                                4.392,10              4.143,72
    Dolar Kepulauan Solomon (SBD)                                                         2.206,00              2.064,68
    Dolar Taiwan (TWD)                                                                      563,12                531,93
    Peso Filipina (PHP)                                                                     291,83                285,18
    Dinar Aljazair (DZD)                                                                    134,23                128,95
    Yen Jepang (JPY)                                                                        110,34                106,49
    Franc Africa (XAF)                                                                       30,34                 29,88
    Myanmar Kyat (MMK)                                                                        8,54                  7,95

    Selisih kurs yang timbul dari penyelesaian pos                  Exchange differences arising on the settlement
    moneter atau dari penjabaran pos moneter                        of monetary items or on translating monetary
    dalam mata uang asing diakui dalam laba rugi.                   items in foreign currencies are recognized in
                                                                    profit or loss.

2.g. Instrumen Keuangan                                     2.g. Financial Instrument
     Pengakuan dan Pengukuran Awal                               Initial Recognition and Measurement
     Grup mengakui aset keuangan atau liabilitas                 The Group recognizes a financial asset or a
     keuangan dalam laporan posisi keuangan                      financial liability in the consolidated statement of
     konsolidasian jika dan hanya jika Grup menjadi              financial position when, and only when, it
     salah satu pihak dalam ketentuan pada kontrak               becomes a party to the contractual provisions of
     instrumen tersebut. Pada saat pengakuan awal                the instrument. At initial recognition, the Group
     aset keuangan atau liabilitas keuangan, Grup                measures all financial assets and financial
     mengukur aset keuangan atau liabilitas                      liabilites at its fair value.
     keuangan tersebut pada nilai wajarnya.

    Dalam hal aset keuangan atau liabilitas                         In the case of a financial asset or financial
    keuangan tidak diukur pada nilai wajar melalui                  liability are not measured at fair value through
                                                           27

Page 37
PT WIJAYA KARYA (PERSERO) Tbk                                              PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                        AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                     NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                 FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                     For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                              June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                            And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                           Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                         (In Thousand Rupiah, unless Otherwise Stated)
    laba rugi, nilai wajar tersebut ditambah atau               profit or loss, such fair value is added or
    dikurangi dengan biaya transaksi yang dapat                 deducted by transaction costs that are directly
    diatribusikan secara langsung pada perolehan                attributable to the acquisition or issuance of the
    atau penerbitan aset keuangan atau liabilitas               financial asset or financial liability.
    keuangan tersebut.

    Biaya transaksi yang dikeluarkan sehubungan                 Transaction costs incurred on acquisition of a
    dengan perolehan aset keuangan dan                          financial asset and issue of a financial liability
    penerbitan      liabilitas  keuangan      yang              classified at fair value through profit or loss are
    diklasifikasikan pada nilai wajar melalui laba              expensed immediately.
    rugi dibebankan segera.

    Grup mengakui aset keuangan atau liabilitas                 The Group recognizes a financial asset or a
    keuangan dalam laporan posisi keuangan                      financial liability in the consolidated statement of
    konsolidasian, jika dan hanya jika, Grup                    financial position when, and only when, it
    menjadi salah satu pihak dalam ketentuan pada               becomes a party to the contractual provisions of
    kontrak instrumen tersebut. Pada saat                       the instrument. At initial recognition, the Group
    pengakuan awal aset keuangan atau liabilitas                measures all financial assets and financial
    keuangan, Grup mengukur pada nilai wajarnya.                liabilites at its fair value.

    Dalam hal aset keuangan atau liabilitas                     In the case of a financial asset or financial
    keuangan tidak diukur pada nilai wajar melalui              liability not at fair value through profit or loss, fair
    laba rugi, nilai wajar tersebut ditambah atau               value plus or minus with the transaction costs
    dikurang dengan biaya transaksi yang dapat                  that are directly attributtable to the acquisition or
    diatribusikan    secara     langsung   dengan               issuance of the financial asset or financial
    perolehan atau penerbitan aset keuangan atau                liability.
    liabilitas keuangan tersebut.

    Biaya transaksi yang dikeluarkan sehubungan                 Transaction costs incurred on acquisition of a
    dengan perolehan aset keuangan dan                          financial asset and issue of a financial liability
    penerbitan      liabilitas  keuangan      yang              classified at fair value through profit or loss are
    diklasifikasikan pada nilai wajar melalui laba              expensed immediately.
    rugi dibebankan segera.

    Pengukuran Selanjutnya Aset Keuangan                        Subsequent Measurement of Financial
                                                                Assets
    Aset keuangan Grup diklasifikasikan ke dalam                The Group’s financial assets are classified into
    kategori berikut: aset keuangan yang diukur                 the following specified categories: financial
    pada biaya perolehan diamortisasi, aset                     assets at amortized costs, financial assets at fair
    keuangan yang diukur pada nilai wajar melalui               value through other comprehensive income, and
    penghasilan komprehensif lain, dan aset                     financial assets at fair value through profit or
    keuangan yang diukur pada nilai wajar melalui               loss.
    laba rugi.

    (i) Aset Keuangan yang Diukur pada Biaya                    (i) Financial Assets Measured at Amortized
        Perolehan Diamortisasi                                      Costs
        Aset keuangan diukur pada biaya perolehan                   Financial assets are measured at amortized
        diamortisasi ketika kedua kondisi berikut                   costs if these conditions are met:
        terpenuhi:
        (1) Aset keuangan dikelola dalam model                     (1) The financial assets is held within a
             bisnis yang bertujuan untuk memiliki                      business model whose objective to hold
             aset    keuangan     dalam    rangka                      the financial assets to collect contractual
             mendapatkan arus kas kontraktual saja;                    cash flows (held to collect); and
             dan
        (2) Persyaratan kontraktual dari aset                      (2) The contractual terms of the financial
             keuangan tersebut memberikan hak                          asset give rise on specified dates to cash

                                                           28

Page 38
PT WIJAYA KARYA (PERSERO) Tbk                                               PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                         AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                      NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                  FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                       For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                              And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                             Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                           (In Thousand Rupiah, unless Otherwise Stated)
             pada tanggal tertentu atas arus kas                         flows that are solely payments of
             yang     semata-mata      merupakan                         principal and interest (“SPPI”) on the
             pembayaran pokok dan bunga dari                             principal amount outstanding.
             jumlah pokok terutang.

       Aset keuangan ini diukur sebesar jumlah                       The financial asset is measured at the
       yang diakui pada awal pengakuan dikurangi                     amount recognized at initial recognition
       dengan pembayaran pokok, kemudian                             minus principal repayments, plus or minus
       dikurangi atau ditambah dengan jumlah                         the cumulative amortization of any difference
       amortisasi kumulatif atas perbedaan jumlah                    between that initial amount and the maturity
       pengakuan awal dengan jumlah pada saat                        amount, and any loss allowance.
       jatuh tempo, dan penurunan nilainya.

       Pendapatan keuangan dihitung dengan                           Interest income is calculated using the
       menggunakan metode suku bunga efektif                         effective interest method and is recognized
       dan diakui di laba rugi. Perubahan pada nilai                 in profit or loss. Changes in fair value are
       wajar diakui di laba rugi ketika aset                         recognized in profit or loss when the asset is
       dihentikan atau direklasifikasi.                              derecognized or reclassified.

       Aset keuangan yang diklasifikasikan menjadi                   Financial assets classified into amortized
       aset keuangan yang diukur pada biaya                          cost may be sold where there is an increase
       perolehan diamortisasi dapat dijual ketika                    in credit risk. Disposals for other reasons are
       terdapat     peningkatan     risiko  kredit.                  permitted but such sales should be
       Penghentian        untuk     alasan     lain                  insignificant in value or infrequent in nature.
       diperbolehkan namun jumlah penjualan
       tersebut harus tidak signifikan jumlahnya
       atau tidak sering.

     (ii) Aset Keuangan yang Diukur pada                        (iii)(ii) Financial Assets Measured at Fair Value
          Nilai    Wajar     Melalui    Penghasilan                       Through Other Comprehensive Income
          Komprehensif Lain (”FVTOCI”)                                    (“FVTOCI”)
           Aset keuangan diukur pada FVTOCI jika                            The financial assets are measured at
           kedua kondisi berikut terpenuhi:                                 FVTOCI if these conditions are met:
           (1) Aset keuangan dikelola dalam model                           (1) The financial asset is held within a
                bisnis yang tujuannya tercapai                                  business model whose objective is
                dengan mendapatkan arus kas                                     achieved     by     both   collecting
                kontraktual   dan     menjual  aset                             contractual cash flows and selling
                keuangan; dan                                                   financial assets; and
           (2) Persyaratan kontraktual dari aset                            (2) The contractual terms of the
                keuangan tersebut memberikan hak                                financial asset give rise, on
                pada tanggal tertentu atas arus kas                             specified dates, to cash flows that
                yang semata-mata dari pembayaran                                are solely payments of principal and
                pokok dan bunga (solely payments of                             interest (SPPI) on the principal
                principal and interest - SPPI) dari                             amount outstanding.
                jumlah pokok terutang.

        Aset keuangan tersebut diukur sebesar                        The financial assets are measured at fair
        nilai wajar, dengan keuntungan atau                          value. The changes in fair value are
        kerugian    diakui    dalam   penghasilan                    recognized initially in other comprehensive
        komprehensif lain, kecuali untuk kerugian                    income (OCI), except for impairment gains
        akibat penurunan nilai dan keuntungan                        and losses, and a portion of foreign exchange
        atau kerugian akibat perubahan kurs yang                     gains and losses, are recognized in profit or
        diakui pada laba rugi.       Ketika aset                     loss. When the asset is derecognized or
        keuangan         tersebut       dihentikan                   reclassified, changes in fair value previously
        pengakuannya        atau    direklasifikasi,                 recognized in other comprehensive income
        keuntungan atau kerugian kumulatif yang                      and accumulated in equity are reclassified

                                                           29

Page 39
PT WIJAYA KARYA (PERSERO) Tbk                                               PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                         AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                      NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                  FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                      For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                               June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                             And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                            Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                          (In Thousand Rupiah, unless Otherwise Stated)
        sebelumnya diakui dalam penghasilan                         from equity to profit and            loss   as    a
        komprehensif lain direklasifikasi dari                      reclassification adjustment.
        ekuitas ke laba rugi sebagai penyesuaian
        reklasifikasi.

   (iii) Aset Keuangan yang Diukur pada Nilai                    (iii) Financial Assets at Fair Value Through
         Wajar Melalui Laba Rugi (“FVTPL”)                             Profit or Loss (“FVTPL”)
         Aset keuangan yang diukur pada FVTPL                          Financial assets measured at FVTPL are
         adalah aset keuangan yang tidak memenuhi                      those that do not meet both criteria for
         kriteria untuk diukur pada biaya perolehan                    measurement at amortized cost or FVTOCI.
         diamortisasi atau diukur pada FVTOCI.

       Setelah pengakuan awal, aset keuangan                        After initial recognition, FVTPL financial
       yang diukur pada FVTPL diukur pada nilai                     assets are measured at fair value. The
       wajarnya. Keuntungan atau kerugian yang                      changes in fair value are recognized in profit
       timbul dari perubahan nilai wajar aset                       or loss.
       keuangan diakui dalam laba rugi.

       Aset keuangan berupa derivatif dan investasi                 Financial assets in the form of derivatives
       pada instrumen ekuitas tidak memenuhi                        and investment in equity instrument are not
       kriteria untuk diukur pada biaya perolehan                   eligible to meet both criteria for amortized
       diamortisasi atau kriteria untuk diukur pada                 costs or FVTPL. Nonetheless, the Group
       FVTOCI, sehingga diukur pada FVTPL.                          may irrevocably designate an investment in
       Namun demikian, Grup dapat menetapkan                        an equity instrument which is not held for
       pilihan yang tidak dapat dibatalkan saat                     trading in the near term as FVTOCI. This
       pengakuan awal atas investasi pada                           designation result in gains and losses to be
       instrumen ekuitas yang bukan untuk                           presented in other comprehensive income,
       diperjualbelikan dalam waktu dekat (held for                 except for dividend income on a qualifying
       trading) untuk diukur pada FVTOCI.                           investment which is recognized in profit or
                                                                    loss.

       Penetapan     ini    menyebabkan      semua                  This designation causes all gains or losses to
       keuntungan atau kerugian disajikan di                        be presented in other comprehensive
       penghasilan komprehensif lain, kecuali                       income, except that dividend income
       pendapatan dividen tetap diakui di laba rugi.                continues to be recognized in profit or loss.
       Keuntungan atau kerugian kumulatif yang                      Cumulative gains or losses previously
       sebelumnya diakui dalam penghasilan                          recognized in other comprehensive income
       komprehensif lain direklasifikasi ke saldo                   are reclassified to retained earnings instead
       laba tidak melalui laba rugi.                                of through profit or loss.

    Pengukuran           Selanjutnya         Liabilitas          Subsequent Measurement of Financial
    Keuangan                                                     Liabilities
    Grup mengklasifikasikan seluruh liabilitas                   The Group shall classify all financial liabilities as
    keuangan sehingga setelah pengakuan awal                     subsequently measured at amortized cost,
    liabilitas keuangan diukur pada biaya perolehan              except for:
    diamortisasi, kecuali:
    (a) Liabilitas keuangan pada nilai wajar melalui             (a) Financial liabilities at fair value through profit
         laba rugi. Liabilitas dimaksud, termasuk                    or loss. Such liabilities, including derivatives
         derivatif   yang     merupakan       liabilitas,            that are liabilities, shall be subsequently
         selanjutnya akan diukur pada nilai wajar.                   measured at fair value.
    (b) Liabilitas keuangan yang timbul ketika                   (b) Financial liabilities that arise when a transfer
         pengalihan aset keuangan yang tidak                         of a financial asset does not qualify for
         memenuhi         kualifikasi     penghentian                derecognition or when the continuing
         pengakuan      atau      ketika   pendekatan                involvement approach applies.
         keterlibatan berkelanjutan diterapkan.
    (c) Kontrak jaminan keuangan dan komitmen                    (c) Financial      guarantee       contracts     and

                                                            30

Page 40
PT WIJAYA KARYA (PERSERO) Tbk                                             PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                       AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                    NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                     For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                              June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                            And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                           Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                         (In Thousand Rupiah, unless Otherwise Stated)
        untuk menyediakan pinjaman dengan suku                      commitments to provide a loan at a
        bunga di bawah pasar. Setelah pengakuan                     below‑market interest rate. After initial
        awal, penerbit kontrak dan penerbit                         recognition, an issuer of such a contract and
        komitmen selanjutnya mengukur kontrak                       an issuer of such a commitment shall
        tersebut sebesar jumlah yang lebih tinggi                   subsequently measure it at the higher of:
        antara:
        (i) Jumlah penyisihan kerugian; dan                         (i) The amount of the loss allowance; and
        (ii) Jumlah yang pertama kali diakui                        (ii) The amount initially recognised less,
             dikurangi dengan, jika sesuai, jumlah                       when appropriate, the cumulative
             kumulatif dari penghasilan yang diakui                      amount of income recognised in
             sesuai dengan prinsip PSAK 115.                             accordance with the principles of
                                                                         PSAK 115.
    (d) Imbalan kontinjesi yang diakui oleh pihak               (d) Contingent consideration recognised by an
        pengakusisi dalam kombinasi bisnis ketika                   acquirer in a business combination to which
        PSAK 103 diterapkan. Imbalan kontinjesi                     PSAK 103 applies. Such contingent
        selanjutnya diukur pada nilai wajar dan                     consideration    shall     subsequently  be
        selisihnya diakui dalam laba rugi.                          measured at fair value with changes
                                                                    recognised in profit or loss.
    Saat pengakuan awal Grup dapat membuat                      An entity may, at initial recognition, irrevocably
    penetapan yang tidak dapat dibatalkan untuk                 designate a financial liability as measured at fair
    mengukur liabilitas keuangan pada nilai wajar               value through profit or loss when permitted by
    melalui laba rugi, jika diizinkan oleh standar              the standard or when doing so results in more
    atau jika penetapan akan menghasilkan                       relevant information, because either:
    informasi yang lebih relevan, karena:
    (a) Mengeliminasi atau mengurangi secara                    (a) Eliminates or significantly reduces a
         signifikan inkonsistensi pengukuran atau                   measurement or recognition inconsistency
         pengakuan (kadang disebut sebagai                          (sometimes referred to as “accounting
         “accounting mismatch”) yang dapat timbul                   mismatch”) that would otherwise arise from
         dari pengukuran aset atau liabilitas atau                  measuring assets or liabilities or recognising
         pengakuan keuntungan dan kerugian atas                     the gains and losses on them on different
         aset atau liabilitas dengan dasar yang                     bases; or
         berbeda beda; atau
    (b) Sekelompok liabilitas keuangan atau aset                (b) A group of financial liabilities or financial
         keuangan dan liabilitas keuangan dikelola                  assets and financial liabilities is managed
         dan kinerjanya dievaluasi berdasarkan nilai                and its performance is evaluated on a fair
         wajar, sesuai manajemen risiko atau                        value basis, in accordance with a
         strategi investasi yang terdokumentasi, dan                documented risk management or investment
         informasi dengan dasar nilai wajar                         strategy, and information about the group is
         dimaksud       atas    kelompok    tersebut                provided internally on that basis to the
         disediakan secara internal untuk personel                  Group’s key management personnel.
         manajemen kunci Grup.

    Penghentian Pengakuan Liabilitas Keuangan                   Derecognition of Financial Liabilities
    Suatu      liabilitas keuangan   dihentikan                 A financial liability is derecognized when it is
    pengakuannya pada saat kewajiban yang                       extinguished, that is when the obligation
    ditetapkan dalam kontrak dihentikan atau                    specified in the contract is discharged or
    dibatalkan atau kadaluwarsa.                                cancelled or expired.

    Ketika sebuah liabilitas keuangan ditukar                   When an existing financial liability is replaced by
    dengan liabilitas keuangan lain dari pemberi                another from the same lender on substantially
    pinjaman yang sama atas persyaratan yang                    different terms, or the terms of an existing
    secara substansial berbeda,           atau   bila           financial liability are substantially modified, such
    persyaratan dari liabilitas keuangan tersebut               an exchange or modification is treated as
    secara substansial dimodifikasi, pertukaran atau            derecognition of the original financial liability and
    modifikasi persyaratan tersebut dicatat sebagai             recognition of a new financial liability, and the
    penghentian pengakuan liabilitas keuangan                   difference in the respective carrying amounts is
                                                           31

Page 41
PT WIJAYA KARYA (PERSERO) Tbk                                              PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                        AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                     NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                 FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                     For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                              June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                            And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                           Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                         (In Thousand Rupiah, unless Otherwise Stated)
    awal dan pengakuan liabilitas keuangan baru,                recognized in profit or loss and recorded as gain
    dan selisih antara nilai tercatat masing-masing             arising from loan restructuring.
    liabilitas keuangan tersebut diakui pada laba
    rugi dan dicatat sebagai keuntungan dari
    restrukturisasi pinjaman.

    Penurunan Nilai Aset Keuangan                               Impairment of Financial Assets
    Grup mengakui kerugian kredit ekspektasian                  The Group recognizes expected credit losses for
    untuk aset keuangan yang diukur pada biaya                  its financial assets measured at amortized cost.
    perolehan diamortisasi.

    Pada setiap tanggal pelaporan, Grup mengukur                At each reporting date, the Group calculates any
    penyisihan kerugian instrumen keuangan                      impairment provision for financial instruments
    sejumlah      kerugian    kredit   ekspektasian             based on its lifetime expected credit loss if the
    sepanjang umurnya jika risiko kredit atas                   credit risk of the financial instruments has
    instrumen keuangan tersebut telah meningkat                 increased significantly since its initial recognition.
    secara signifikan sejak pengakuan awal. Namun,              However, if credit risk has not increased
    jika risiko kredit instrumen keuangan tersebut              significantly since initial recognition, then 12
    tidak meningkat secara signifikan sejak                     months expected credit loss is recognized.
    pengakuan awal, maka grup mengakui sejumlah
    kerugian kredit ekspektasian 12 bulan.

    Grup menerapkan metode yang disederhanakan                  The Group applied a simplified approach to
    untuk mengukur kerugian kredit ekspektasian                 measure such expected credit losses for trade
    tersebut terhadap piutang usaha dan aset                    receivables and contract assets without a
    kontrak tanpa komponen pendanaan yang                       significant financing component.
    signifikan.
    Grup menganggap aset keuangan gagal bayar                   The Group considers a financial asset to be in
    ketika pihak ketiga tidak mampu membayar                    default when the counterparty is unlikely to pay
    kewajiban kreditnya kepada Grup secara penuh.               its credit obligations to the Group in full. The
    Periode maksimum yang dipertimbangkan ketika                maximum period considered when estimating
    memperkirakan kerugian kredit ekspektasian                  expected credit loss is the maximum contractual
    adalah periode maksimum kontrak dimana Grup                 period over which the Group is exposed to credit
    terekspos terhadap risiko kredit.                           risk.

    Penyisihan kerugian diakui sebagai pengurang                Impairment losses are recognized as a deduction
    jumlah tercatat aset keuangan. Sedangkan                    in financial assets’ carrying amount. The
    jumlah kerugian kredit ekspektasian (atau                   expected credit loss (or recovery of credit loss) is
    pemulihan kerugian kredit) diakui dalam laba                recognized in profit or loss, as gains or losses of
    rugi, sebagai keuntungan atau kerugian                      financial asset impairment.
    penurunan nilai.

    Pengukuran kerugian kredit ekspektasian dari                The expected credit loss of financial instruments
    instrumen keuangan dilakukan dengan suatu                   are conducted by a means which reflect:
    cara yang mencerminkan:
     i. Jumlah yang tidak bias dan rata-rata                    i.   An unbiased and probability-weighted
          probabilitas tertimbang yang ditentukan                    amount that reflects a range of possible
          dengan       mengevaluasi     serangkaian                  outcomes;
          kemungkinan yang dapat terjadi;
     ii. Nilai waktu uang; dan                                  ii. Time value of money; and
     iii. Informasi yang wajar dan terdukung yang               iii. Reasonable and supportable information
          tersedia tanpa biaya atau upaya berlebihan                 that is available without undue cost or effort
          pada tanggal pelaporan mengenai peristiwa                  about past events, current conditions and
          masa lalu, kondisi kini, dan perkiraan                     forecasts of future conditions.
          kondisi ekonomi masa depan.


                                                           32

Page 42
PT WIJAYA KARYA (PERSERO) Tbk                                              PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                        AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                     NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                 FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                     For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                              June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                            And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                           Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                         (In Thousand Rupiah, unless Otherwise Stated)
    Aset keuangan dapat dianggap tidak mengalami                Financial assets may be considered to not
    peningkatan risiko kredit secara signifikan sejak           having significant increase in credit risk since
    pengakuan awal jika aset keuangan memiliki                  initial recognition if the financial assets have a
    risiko kredit yang rendah pada tanggal                      low credit risk at the reporting date. Credit risk on
    pelaporan. Risiko kredit pada instrumen                     financial instrument may be considered be low if
    keuangan dianggap rendah ketika aset                        there is a low risk of default, the borrower has a
    keuangan tersebut memiliki risiko gagal bayar               strong capacity to meet its contractual cash flow
    yang rendah, peminjam memiliki kapasitas yang               obligations in the near term and adverse
    kuat untuk memenuhi kewajiban arus kas                      changes in economic and business conditions in
    kontraktualnya dalam jangka waktu dekat dan                 the longer term may, but will not necessarily,
    memburuknya kondisi ekonomi dan bisnis dalam                reduce the ability of the borrower to fulfil its
    jangka waktu panjang mungkin, namun tidak                   contractual cash flow obligations. To determine
    selalu, menurunkan kemampuan peminjam                       whether a financial asset has a low credit risk,
    untuk     memenuhi      kewajiban     arus    kas           the Group may use internal credit risk rating or
    kontraktualnya. Untuk menentukan apakah aset                external assessment. For example, a financial
    keuangan memiliki risiko kredit rendah, Grup                asset with “investment grade” according to
    dapat menggunakan peringkat risiko kredit                   external assessment has a low credit risk rating,
    internal atau penilaian eksternal. Misal, aset              thus it does not experience an increase in
    keuangan dengan peringkat “investment grade”                significant credit risk since initial recognition.
    berdasarkan penilaian eksternal merupakan
    instrumen yang memiliki risiko kredit yang
    rendah, sehingga tidak mengalami peningkatan
    risiko kredit secara signifikan sejak pengakuan
    awal.

    Metode Suku Bunga Efektif                                   The Effective Interest Method
    Metode suku bunga efektif adalah metode yang                The effective interest method is a method of
    digunakan untuk menghitung biaya perolehan                  calculating the amortized cost of a financial
    diamortisasi dari aset atau liabilitas keuangan             asset or a financial liability (or group of financial
    (atau kelompok aset atau liabilitas keuangan)               assets or financial liabilities) and of allocating the
    dan metode untuk mengalokasikan pendapatan                  interest income or interest expense over the
    bunga atau beban bunga selama periode yang                  relevant period.
    relevan.

    Suku bunga efektif adalah suku bunga yang                   The effective interest rate is the rate that exactly
    secara       tepat   mendiskontokan  estimasi               discount estimated future cash payments or
    pembayaran atau penerimaan kas masa depan                   receipts through the expected life of the financial
    selama perkiraan umur dari instrumen                        instrument or, when appropriate, a shorter period
    keuangan, atau jika lebih tepat, digunakan                  to the net carrying amount of the financial asset
    periode yang lebih singkat untuk memperoleh                 or financial liability.
    jumlah tercatat neto dari aset keuangan atau
    liabilitas keuangan.

    Pada saat menghitung suku bunga efektif,                    When calculating the effective interest rate, the
    Grup     mengestimasi    arus    kas     dengan             Group estimates cash flows considering all
    mempertimbangkan        seluruh     persyaratan             contractual terms of the financial instrument, for
    kontraktual dalam instrumen keuangan tersebut,              example, prepayment, call and similar option,
    seperti pelunasan dipercepat, opsi beli dan opsi            but shall not consider future credit losses. The
    serupa lain, tetapi tidak mempertimbangkan                  calculation includes all fees and points paid or
    kerugian kredit masa depan. Perhitungan ini                 received between parties to the contract that are
    mencakup seluruh komisi dan bentuk lain yang                an integral part of the effective interest rate,
    dibayarkan atau diterima oleh pihak-pihak                   transaction costs, and all other premiums or
    dalam kontrak yang merupakan bagian                         discounts.
    takterpisahkan dari suku bunga efektif, biaya
    transaksi, dan seluruh premium atau diskonto
    lain.

                                                           33

Page 43
PT WIJAYA KARYA (PERSERO) Tbk                                              PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                        AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                     NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                 FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                     For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                              June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                            And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                           Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                         (In Thousand Rupiah, unless Otherwise Stated)
    Saling Hapus Aset Keuangan dan Liabilitas                   Offsetting a Financial Asset and a Financial
    Keuangan                                                    Liability
    Aset keuangan dan liabilitas keuangan saling                A financial asset and financial liability shall be
    hapus, jika dan hanya jika, Grup saat ini                   offset when and only when, the Group currently
    memiliki hak yang dapat dipaksakan secara                   has a legally enforceable right to set off
    hukum untuk melakukan saling hapus atas                     the recognized amount; and intends either to
    jumlah yang telah diakui tersebut; dan                      settle on a net basis, or to realize
    bermaksud untuk menyelesaikan secara neto                   the asset and settle the liability simultaneously.
    atau    untuk    merealisasikan     aset     dan
    menyelesaikan liabilitasnya secara simultan.

    Pengukuran Nilai Wajar                                      Fair Value Measurement
    Nilai wajar adalah harga yang akan diterima                 Fair value is the price that would be received to
    untuk menjual suatu aset atau harga yang akan               sell an asset or paid to transfer a liability in an
    dibayar untuk mengalihkan suatu liabilitas                  orderly transaction between market participants
    dalam transaksi teratur antara pelaku pasar                 at the measurement date.
    pada tanggal pengukuran.

    Nilai wajar aset dan liabilitas keuangan                    The fair value of financial assets and financial
    diestimasi untuk keperluan pengakuan dan                    liabilities must be estimated for recognition and
    pengukuran      atau    untuk    keperluan                  measurement or for disclosure purposes.
    pengungkapan.

    Nilai wajar dikategorikan dalam level yang                  Fair values are categorised into different levels
    berbeda dalam suatu hirarki nilai wajar                     in a fair value hierarchy based on the degree to
    berdasarkan pada apakah input suatu                         which the inputs to the measurement are
    pengukuran dapat diobservasi dan signifikansi               observable and the significance of the inputs to
    input terhadap keseluruhan pengukuran nilai                 the fair value measurement in its entirety:
    wajar:
    (i) Harga kuotasian (tanpa penyesuaian) di                  (i) Quoted prices (unadjusted) in active markets
          pasar aktif untuk aset atau liabilitas yang                 for identical assets or liabilities that can be
          identik yang dapat diakses pada tanggal                     accessed at the measurement date
          pengukuran (Level 1);                                       (Level 1);
    (ii) Input selain harga kuotasi yang termasuk               (ii) Inputs other than quoted prices included in
          dalam Level 1 yang dapat diobservasi                        Level 1 that are observable for the assets or
          untuk aset atau liabilitas, baik secara                     liabilities, either directly or indirectly
          langsung maupun tidak langsung (Level 2);                   (Level 2);
    (iii) Input yang tidak dapat diobservasi untuk              (iii) Unobservable inputs for the assets or
          aset atau liabilitas (Level 3).                             liabilities (Level 3).

    Dalam mengukur nilai wajar aset atau liabilitas,            When measuring the fair value of an asset or a
    Grup sebisa mungkin menggunakan data pasar                  liability, the Group uses market observable data
    yang dapat diobservasi. Apabila nilai wajar aset            to the extent possible. If the fair value of an
    atau liabilitas tidak dapat diobservasi secara              asset or a liability is not directly observable, the
    langsung, Grup menggunakan teknik penilaian                 Group uses valuation techniques that are
    yang sesuai dengan keadaannya dan                           appropriate      in    the    circumstances     and
    memaksimalkan penggunaan input yang dapat                   maximize the use of relevant observable
    diobservasi yang relevan dan meminimalkan                   inputs and minimize the use of unobservable
    penggunaan input yang tidak dapat diobservasi.              inputs.

    Perpindahan antara level hierarki nilai wajar               Transfers between levels of the fair value
    diakui oleh Grup pada akhir periode pelaporan               hierarchy are recognised by the Group at the
    saat perpindahan terjadi.                                   end of the reporting period during which the
                                                                change occurred.



                                                           34

Page 44
PT WIJAYA KARYA (PERSERO) Tbk                                                 PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                           AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                    FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                         For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                  June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                                And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                               Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                             (In Thousand Rupiah, unless Otherwise Stated)
2.h. Kas dan Setara Kas                                         2.h. Cash and Cash Equivalents
     Kas dan setara kas termasuk kas, kas di bank                    Cash and cash equivalents are cash on hand,
     (rekening giro), dan deposito berjangka yang                    cash in banks (demand deposits), and time
     jatuh tempo dalam jangka waktu 3 bulan atau                     deposits with maturity periods of 3 months or
     kurang pada saat penempatan yang tidak                          less at the time of placement that are not used
     digunakan sebagai jaminan atau tidak dibatasi                   as collateral or are not restricted.
     penggunaannya.

2.i. Piutang Retensi                                            2.i. Retention Receivables
     Piutang retensi merupakan piutang Grup                          Retention receivable represents the Group’s
     kepada pemberi kerja yang akan dilunasi                         receivable from the owner of the project which
     setelah penyelesaian kontrak atau pemenuhan                     will be paid after completion of the contract or
     kondisi yang ditentukan kontrak. Piutang                        fulfillment of certain conditions in the contract.
     retensi dicatat pada saat pemotongan                            Retention receivable is recorded when a certain
     sejumlah persentase tertentu dari setiap                        percentage deduction is applied in from each
     tagihan termin untuk ditahan oleh pemberi                       progress billing which is retained by
     kerja    sampai    suatu    kondisi  setelah                    the owner of project until certain condition after
     penyelesaian kontrak dipenuhi.                                  completion of the contract has been met.

2.j. Tagihan Bruto kepada Pemberi Kerja                         2.j. Gross Amount Due from Customers
     Tagihan bruto kepada pemberi kerja                              Gross amount due from customers represent’s
     merupakan piutang Grup yang berasal dari                        Group’s receivable originated from construction
     pekerjaan kontrak konstruksi yang dilakukan,                    contract in progress. Gross amount due from
     namun pekerjaan yang dilakukan masih dalam                      employer is presented as the net amount of
     pelaksanaan. Tagihan bruto disajikan sebesar                    costs incurred plus recognized profits, less the
     selisih antara biaya yang terjadi ditambah laba                 sum of recognized losses and progress
     yang diakui dikurangi kerugian yang diakui dan                  billings.
     termin.

     Tagihan bruto kepada pemberi kerja diakui                      Gross amount due            from    customers is
     sebagai pendapatan sesuai dengan metode                        recognized as revenue based on the percentage
     persentase penyelesaian yang dinyatakan                        of completion method which is stated on the
     dalam berita acara penyelesaian pekerjaan,                     certificate of work completion, while the
     dimana faktur belum dapat ditagihkan karena                    invoice is still unbilled due to the difference
     perbedaan antara tanggal berita acara                          between the       date   of    physical progress
     kemajuan (progress) fisik dengan pengajuan                     certificates and the submission of billing on the
     penagihan pada tanggal laporan posisi                          consolidated statement of financial position date.
     keuangan konsolidasian.

2.k. Pekerjaan dalam Proses Konstruksi (PDPK)                   2.k. Construction Work in Progress (CWIP)
     PDPK merupakan biaya yang terjadi dalam                         CWIP represents costs incurred in fulfilling
     memenuhi kontrak dengan pelanggan yang                          contract with customers which are recognized
     diakui sebagai aset, yang berhubungan                           as an asset, that related directly to a contract
     langsung dengan kontrak dimana Grup dapat                       that the Group can specifically identify, generate
     mengidentifikasi secara spesifik, menghasilkan                  or enhance resources of the Group that will be
     atau meningkatkan sumber daya Grup yang                         used in satisfying (or continuing to satisfy)
     akan digunakan dalam memenuhi (atau terus                       performance obligations in the future and
     memenuhi) kewajiban pekerjaan dalam masa                        are expected to be recovered. The Group
     depan dan diharapkan dapat dipulihkan. Grup                     reviews the CWIP for impairment whenever
     menelaah penurunan nilai PDPK setiap kali                       events or changes in circumstances indicate
     peristiwa     atau     perubahan      keadaan                   that the carrying amount may not be
     menunjukkan bahwa nilai tercatat mungkin                        recoverable.
     tidak dapat diperoleh kembali.

2.l. Persediaan                                                 2.l. Inventories
     Persediaan dinyatakan berdasarkan jumlah                        Inventories are carried at the lower of cost and

                                                           35

Page 45
PT WIJAYA KARYA (PERSERO) Tbk                                             PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                       AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                    NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                     For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                              June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                            And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                           Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                         (In Thousand Rupiah, unless Otherwise Stated)
     terendah antara biaya perolehan dan nilai                  net realizable value. The cost of inventories
     realisasi neto. Biaya perolehan terdiri dari               comprises all costs incurred in bringing the
     seluruh biaya lain yang timbul sampai                      inventories to their present location and
     persediaan berada dalam kondisi dan lokasi                 condition. Cost is determined using the weighted
     saat ini. Biaya perolehan ditentukan metode                average method. Net realizable value is the
     rata-rata tertimbang. Nilai realisasi neto                 estimated selling price in the ordinary course of
     merupakan taksiran harga jual dalam kegiatan               business less the estimated costs of completion
     usaha biasa dikurangi estimasi biaya                       and the estimated costs necessary to make the
     penyelesaian dan estimasi biaya yang                       sale.
     diperlukan untuk membuat penjualan.

     Penyisihan penurunan       nilai persediaan                Allowance for decrease in value of inventory is
     dibentuk   berdasarkan     penelaahan   fisik              provided based on the physical check of
     persediaan pada akhir periode.                             inventory at the end of the period.

     Setiap penurunan nilai persediaan di bawah                 The amount of any write-down of inventories to
     biaya perolehan menjadi nilai realisasi neto               net realizable value and all losses of inventories
     dan seluruh kerugian persediaan diakui                     shall be recognised as an expense in the period
     sebagai beban pada periode terjadinya                      the write-down or loss occurs. The amount of
     penurunan atau kerugian tersebut. Setiap                   any reversal of any write-down of inventories
     pemulihan kembali penurunan nilai persediaan               that arises from an increase in net realizable
     karena peningkatan kembali nilai realisasi                 value, is recognised as a reduction in the
     neto, diakui sebagai pengurangan terhadap                  amount of inventories recognised as an expense
     jumlah beban persediaan pada periode                       in the period in which the reversal occurs.
     terjadinya pemulihan tersebut.

     Persediaan - Aset Real Estat                                Inventories - Real Estate Assets
     Persediaan terdiri dari tanah yang sedang                  Inventories consist of land under development,
     dikembangkan, tanah matang, bangunan yang                  mature land, buildings under construction, the
     sedang di konstruksi, bangunan jadi siap dijual            building ready for sale (houses, shop houses
     (rumah tinggal, rumah toko (ruko) dan                      (ruko) and strata title building) and material;
     bangunan strata title) dan material; dinyatakan            stated at the lower of cost or net realizable value.
     sebesar nilai yang lebih rendah antara biaya               Net realizable value is the estimated selling price
     perolehan atau nilai realisasi bersih. Nilai               in the ordinary course of business deducted by
     realisasi bersih merupakan estimasi harga jual             the estimated costs of completion and estimated
     dalam kegiatan usaha biasa dikurangkan                     selling expenses.
     dengan estimasi biaya penyelesaian dan
     estimasi biaya penjualan.

     Biaya perolehan tanah dalam proses                         Land acquisition costs in the development
     pengembangan meliputi biaya perolehan tanah                process include the cost of acquiring
     yang belum dikembangkan ditambah dengan                    undeveloped land plus direct and indirect
     biaya pengembangan langsung dan tidak                      development costs that can be attributed to real
     langsung yang dapat diatribusikan pada                     estate development activities and borrowing
     kegiatan pengembangan real estat serta biaya               costs. The land in the development process will
     pinjaman. Tanah dalam proses pengembangan                  be moved to mature land which is ready for sale
     akan dipindahkan ke tanah matang yang siap                 when the land is completed with an area-wide
     dijual pada saat tanah tersebut selesai                    method. For a high-rise product, it is transferred
     dikembangkan dengan metode luas area.                      to building units.
     Untuk produk high rise dipindahkan ke unit
     bangunan.

     Biaya pengembangan tanah, termasuk tanah                   The cost of land development, including land
     yang digunakan sebagai jalan dan prasarana                 used as roads and infrastructure or other areas
     atau area yang tidak dijual lainnya,                       that are not sold, are allocated proportionally
     dialokasikan berdasarkan pembebanan secara                 based on the imposition of the estimated total

                                                           36

Page 46
PT WIJAYA KARYA (PERSERO) Tbk                                                  PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                            AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                         NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                     FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                         For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                  June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                                And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                               Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                             (In Thousand Rupiah, unless Otherwise Stated)
     proporsional estimasi jumlah beban prasarana                   cost of improvements to the area of land that
     untuk luas tanah yang terjual setelah                          were sold after considering the cumulative
     memperhitungkan         pengeluaran     biaya                  spending on infrastructure costs by the end of
     prasarana kumulatif sampai dengan akhir                        the year. Cost of unit buildings under
     tahun. Biaya perolehan unit bangunan yang                      construction include the cost of construction and
     sedang di konstruksi meliputi biaya konstruksi                 then moved into the property ready for sale when
     lalu dipindahkan ke unit bangunan yang siap                    completed and ready for sale by using the
     dijual pada saat selesai dibangun dan siap                     specific identification method.
     dijual     dengan    menggunakan      metode
     identifikasi khusus.

2.m. Properti Investasi                                         2.m. Investment Properties
     Properti investasi adalah properti (tanah atau                 Investment properties are properties (land or a
     bangunan atau bagian dari suatu bangunan                       building or part of a building or both) held by the
     atau kedua-duanya) yang dikuasai oleh                          owner or the lessee under a finance lease to
     pemilik    atau    penyewa       melalui   sewa                earn rentals or for capital appreciation or both,
     pembiayaan untuk menghasilkan sewa atau                        rather than for use in the production or supply of
     untuk kenaikan nilai atau kedua-duanya, dan                    goods or services or for administrative
     tidak untuk digunakan dalam produksi atau                      purposes, or sale in the daily business activities.
     penyediaan barang atau jasa atau untuk
     tujuan administratif, atau dijual dalam kegiatan
     usaha sehari-hari.

     Properti investasi diakui sebagai aset jika dan                 Investment properties are recognized as an
     hanya jika besar kemungkinan manfaat                            asset when, and only when it is probable that
     ekonomi masa depan yang terkait dengan                          the future economic benefits that are
     properti investasi akan mengalir ke entitas dan                 associated with the investment properties will
     biaya perolehan properti investasi dapat diukur                 flow to the entity and the cost of the investment
     dengan andal.                                                   properties can be measured reliably.

     Properti investasi pada awalnya diukur                          Investment properties are measured initially at
     sebesar biaya perolehan, meliputi biaya                         their cost, including transaction costs.
     transaksi. Setelah pengakuan awal, properti                     Subsequent to initial recognition, investment
     investasi    diukur    sebesar   nilai   wajar.                 properties are measured at fair value. Gains or
     Keuntungan dan kerugian yang timbul dari                        losses arising from a change in the fair value of
     perubahan nilai wajar properti investasi diakui                 investment property are recognized in profit or
     dalam laba rugi pada periode terjadinya.                        loss, in the period in which they arise.
     Tanah, bangunan, dan prasarana yang                             Land, building, and equipment that experience
     mengalami perubahan nilai wajar secara                          significant and fluctuating changes in fair value
     signifikan dan fluktuatif akan direvaluasi                      will be revalued annually, while assets that do
     secara tahunan sedangkan aset yang tidak                        not experience significant changes in fair value
     mengalami perubahan nilai wajar secara                          will be revalued at least every 3 (three) years.
     signifikan akan direvaluasi paling kurang
     setiap 3 (tiga) tahun.

     Biaya      pemeliharaan    dan    perbaikan                     Maintenance and repair costs are charged to
     dibebankan pada laba rugi pada saat                             profit or loss as incurred, while renewals and
     terjadinya,   sedangkan    pemugaran    dan                     betterments are capitalized.
     penambahan dikapitalisasi.

     Grup mengalihkan properti ke atau dari                         The Group shall transfer a property to, or from
     properti investasi jika, dan hanya jika, properti              investment property when, and only when, there
     memenuhi, atau berhenti memenuhi, definisi                     the property meets, or ceases to meet, the
     properti investasi dan terdapat bukti atas                     definition of investment properties and there is
     perubahan penggunaan, mencakup:                                evidence of the change in use, include:
     a. Dimulainya penggunaan oleh pemilik, atau                    a. Commencement of owner-occupation, or of

                                                           37

Page 47
PT WIJAYA KARYA (PERSERO) Tbk                                                 PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                           AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                    FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                         For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                  June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                                And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                               Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                             (In Thousand Rupiah, unless Otherwise Stated)
        pengembangan untuk pemilik, untuk                              development with a view to owner
        pengalihan dari properti investasi menjadi                     occupation, for a transfer from investment
        properti yang digunakan sendiri;                               properties to owner-occupied property;
     b. Dimulainya pengembangan untuk dijual,                       b. Commencement of development with a view
        untuk pengalihan dari properti investasi                       to sale, for a transfer from investment
        menjadi persediaan;                                            properties to inventories;
     c. Berakhirnya pemakaian oleh pemilik, untuk                   c. End of owner-occupation, for a transfer from
        dijual, untuk pengalihan dari properti yang                    owner-occupied properties to investment
        digunakan      sendiri  menjadi    properti                    properties; and
        investasi; dan
     d. Insepsi sewa operasi kepada pihak lain,                     d. Inception of an operating lease to another
        untuk pengalihan dari persediaan menjadi                        party, for a transfer from inventories to
        properti investasi.                                             investment properties.

     Properti investasi dihentikan pengakuannya                     Investment properties are derecognized on
     pada saat dilepaskan atau ketika tidak                         disposal or when investment properties are
     digunakan lagi secara permanen dan tidak                       permanently withdrawn from use and no future
     memiliki manfaat ekonomi masa depan yang                       economic benefits are expected from their
     diperkirakan dari pelepasannya. Keuntungan                     disposal. Gains or losses arising from the
     atau kerugian yang timbul dari penghentian                     retirement or disposal are determined as the
     atau pelepasan ditentukan dari selisih antara                  difference between the net disposal proceeds
     hasil neto pelepasan dan jumlah tercatat aset,                 and the carrying amount of the asset and are
     dan diakui dalam laba rugi pada periode                        recognized in profit or loss in the period of the
     terjadinya penghentian atau pelepasan.                         retirement or disposal.

2.n. Aset Tetap                                                 2.n. Fixed Assets
     Aset tetap pada awalnya diakui sebesar biaya                    Fixed assets are initially recognized at cost,
     perolehan yang meliputi harga perolehannya                      which comprises their purchase price and any
     dan setiap biaya yang dapat diatribusikan                       cost directly attributable in bringing the assets
     langsung untuk membawa aset ke kondisi dan                      to the location and condition necessary for
     lokasi yang diinginkan agar aset siap                           them to be capable of operating in the manner
     digunakan sesuai intensi manajemen.                             intended by management.

     Apabila relevan, biaya perolehan juga dapat                     When applicable, the cost may also comprise
     mencakup estimasi awal biaya pembongkaran                       the initial estimate of the costs of dismantling
     dan pemindahan aset tetap dan restorasi                         and removing the item and restoring the site on
     lokasi aset tetap. Kewajiban tersebut timbul                    which it is located. The obligation for which an
     ketika aset tetap diperoleh atau sebagai                        entity incurs either when the item is acquired or
     konsekuensi penggunaan aset tetap selama                        as a consequence of having used the item
     periode tertentu untuk tujuan selain untuk                      during a particular period for purposes other
     memproduksi persediaan selama periode                           than to produce inventories during that period.
     tersebut.

     Setelah pengakuan awal, aset tetap kecuali                      After initial recognition, fixed assets, except
     tanah dinyatakan sebesar biaya perolehan                        land, are carried at their cost less any
     dikurangi   akumulasi     penyusutan  dan                       accumulated       depreciation,     and     any
     akumulasi rugi penurunan nilai.                                 accumulated impairment losses.

     Tanah diakui sebesar harga perolehannya dan                     Lands are recognized at its cost and are not
     tidak disusutkan.                                               depreciated.

     Penyusutan diakui dengan metode garis lurus,                    Depreciation is recognized so as to write-off the
     kecuali peralatan proyek diakui dengan                          cost of assets less residual values using the
     metode jumlah angka tahun, setelah                              straight-line method, except for project
     memperhitungkan nilai residu berdasarkan                        equipment using the sum-of-the-years method,
     taksiran masa aset tetap. Berdasarkan Surat                     based on the estimated useful lives of the

                                                           38

Page 48
PT WIJAYA KARYA (PERSERO) Tbk                                                PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                          AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                       NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                   FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                       For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                              And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                             Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                           (In Thousand Rupiah, unless Otherwise Stated)
     Keputusan Direksi No.01.03./A.DIR 7677/2013                    assets. Based on Directors’ Decision letter
     tanggal 30 Oktober 2013 dan Surat Keputusan                    No. 01.03./A.DIR 7677/2013 dated October 30,
     Direksi WIKA Beton No. SK.01.03/WB-                            2013 and WIKA Beton Board of Directors’
     0A.0001/2023 tanggal 25 September 2023                         Decision     letter    No.      SK.01.03/WB-
     taksiran masa manfaat aset tetap adalah                        0A.0001/2023 dated September 25, 2023, the
     sebagai berikut:                                               estimated useful lives of fixed assets are as
                                                                    follows:
                                                           Tahun/
                                                            Years

     Bangunan                                              10-50                                               Building
     Prasarana                                             10-40                                         Infrastructure
     Perlengkapan kantor                                    3-4                                      Office equipment
     Kendaraan                                             4-10                                               Vehicles
     Peralatan Pabrik dan Proyek                           4-25                           Project and Plant Equipment

     Lahan tambang disajikan sebesar harga                          Quarries are stated at cost less, the value of
     perolehan, disusutkan dengan menggunakan                       mining properties is depreciated using the unit
     unit produksi dimulai pada awal operasi                        of production method from the date of the
     komersial, penyusutan tersebut dihitung                        commencement of commercial operation.
     berdasarkan estimasi cadangan. Perubahan                       The depreciation is calculated based on
     dalam estimasi cadangan dilakukan secara                       estimated mineable reserves. Changes in
     prospektif dimulai sejak periode terjadinya                    estimated reserves are accounted for on a
     perubahan.                                                     prospective basis, from the beginning of the
                                                                    period in which the change occurs.

     Aset tetap yang dikonstruksi sendiri disajikan                 Self-constructed fixed assets are presented as
     sebagai bagian aset tetap sebagai “Aset Dalam                  part of the fixed assets under “Assets in
     Penyelesaian” dan dinyatakan sebesar biaya                     Progress” and are stated at its cost. All costs,
     perolehannya. Semua biaya, termasuk biaya                      including borrowing costs, incurred in relation
     pinjaman, yang terjadi sehubungan dengan                       with the construction of these assets are
     konstruksi aset tersebut dikapitalisasi sebagai                capitalized as part of the cost of assets in
     bagian dari biaya perolehan aset tetap dalam                   construction.
     konstruksi.

     Biaya perolehan aset tetap dalam konstruksi                    Cost of assets in construction shall exclude
     tidak termasuk setiap laba internal, jumlah                    any internal profits, cost of abnormal
     tidak normal dari biaya pemborosan yang                        amounts of wasted material, labour, or other
     terjadi dalam pemakaian bahan baku, tenaga                     resources incurred.
     kerja atau sumber daya lain.
     Akumulasi biaya perolehan yang akan                            The accumulated costs will be transferred to
     dipindahkan ke masing-masing pos aset tetap                    the respective fixed asset items at the time the
     yang sesuai pada saat aset tersebut selesai                    asset is completed or ready for use and are
     dikerjakan atau siap digunakan dan disusutkan                  depreciated since the operation.
     sejak beroperasi.

     Nilai tercatat dari suatu aset tetap dihentikan                The carrying amount of an item of fixed assets
     pengakuannya pada saat pelepasan atau                          is derecognized on disposal or when no future
     ketika tidak terdapat lagi manfaat ekonomi                     economic benefits are expected from its use or
     masa depan yang diharapkan dari penggunaan                     disposal. Any gain or loss arising from
     atau pelepasannya. Keuntungan atau kerugian                    derecognition (that is determined as the
     yang timbul dari penghentian pengakuan                         difference between the net disposal proceeds,
     tersebut (yang ditentukan sebesar selisih                      if any, and the carrying amount of the item) is
     antara jumlah hasil pelepasan neto, jika ada,                  included in profit or loss when the item is
     dan jumlah tercatatnya) dimasukkan dalam                       derecognized.
     laba rugi pada saat penghentian pengakuan

                                                           39

Page 49
PT WIJAYA KARYA (PERSERO) Tbk                                                    PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                              AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                           NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                       FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                            For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                     June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                                   And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                                  Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                                (In Thousand Rupiah, unless Otherwise Stated)
     tersebut dilakukan.

     Pada akhir periode pelaporan, Grup melakukan                    At the end of each reporting period, the Group
     penelaahan berkala atas masa manfaat, nilai                     makes regular review of the useful life, residual
     residu, metode penyusutan, dan sisa umur                        values, depreciation method and remaining
     pemakaian berdasarkan kondisi teknis.                           useful life based on the technical conditions.

2.o. Sewa                                                       2.o. Lease
     Pada tanggal insepsi suatu kontrak, Grup                        At inception of a contract, the Group assesses
     menilai apakah suatu kontrak merupakan, atau                    whether a contract is, or contains, a lease.
     mengandung, sewa. Suatu kontrak merupakan,                      A contract is, or contains, a lease if the contract
     atau mengandung sewa jika kontrak tersebut                      conveys the right to control the use of an
     memberikan      hak     untuk      mengendalikan                identified asset for a period of time in exchange
     penggunaan suatu aset teridentifikasi selama                    for consideration. To assess whether a contract
     suatu jangka waktu untuk dipertukarkan                          conveys the right to control the use of an
     dengan imbalan. Untuk menilai apakah suatu                      identified asset, the Group assesses whether:
     kontrak memberikan hak untuk mengendalikan
     suatu aset identifikasian, Grup menilai apakah:
     a. Kontrak melibatkan penggunaan suatu aset                     a. The contract involves the use of an
        identifikasian – ini dapat ditentukan secara                    identified asset – this may be specified
        eksplisit atau implisit dan secara fisik dapat                  explicitly or implicitly and should be
        dibedakan atau mewakili secara substantial                      physically      distinct    or     represents
        seluruh kapasitas aset yang secara fisik                        substantially all of the capacity of a
        dapat dibedakan. Jika pemasok memiliki                          physically distinct asset. If the supplier has
        hak substitusi substantif, maka aset                            the substantive substitution right, then the
        tersebut tidak teridentifikasi;                                 asset is not identified;
     b. Grup memiliki hak untuk memperoleh                           b. The Group has the right to obtain
        secara     substansial     seluruh     manfaat                  substantially all of the economic benefits
        ekonomi dari penggunaan aset selama                             from use of the asset throughout the
        periode penggunaan; dan                                         period of use; and
     c. Grup memiliki hak untuk mengarahkan                          c. The Group has the right to direct the use of
        penggunaan           aset        identifikasian.                the identified asset. The Group has this
        Perusahaan memiliki hak ini ketika hak                          right when it has the decision-making
        pengambilan keputusan yang paling                               rights that are most relevant to changing
        relevan untuk mengubah bagaimana dan                            how and for what purpose the asset is
        untuk tujuan apa aset tersebut digunakan.                       used. In certain circumstances where all
        Dalam kondisi tertentu di mana semua                            the decisions about how and for what
        keputusan tentang bagaimana dan untuk                           purpose the asset is used are
        tujuan apa aset digunakan telah ditentukan                      predetermined, the Group has the right to
        sebelumnya, Grup memiliki hak untuk                             direct the use of the asset if either:
        mengarahkan penggunaan aset tersebut
        jika:
        - Grup          memiliki        hak       untuk                   -      The Group has the right to operate the
            mengoperasikan aset; atau                                            asset; or
        - Grup mendesain aset dengan cara                                 -      The Group designed the asset in a
            menetapkan sebelumnya bagaimana                                      way that predetermines how and for
            dan untuk tujuan apa aset akan                                       what purpose the asset will be used.
            digunakan.

      Pada tanggal insepsi atau pada saat penilaian                   At the inception date or on reassessment of a
      kembali suatu kontrak yang mengandung                           contract that contains a lease component, the
      suatu komponen sewa, Grup mengalokasikan                        Group allocates consideration in the contract
      imbalan dalam kontrak ke masing-masing                          to each lease component on the basis of its
      komponen sewa berdasarkan harga tersendiri                      relative stand-alone prices.
      relatif dari komponen sewa.


                                                           40

Page 50
PT WIJAYA KARYA (PERSERO) Tbk                                           PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                     AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                  NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                              FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                   For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                            June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                          And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                         Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                       (In Thousand Rupiah, unless Otherwise Stated)
      Pembayaran sewa yang termasuk dalam                       Lease payments included in the measurement
      indeks liabilitas sewa meliputi: pembayaran               of the lease liability comprise the following:
      sewa tetap, sewa variabel yang bergantung                 fixed payments, variable lease payments that
      pada indeks, jumlah yang akan dibayarkan                  depend on an index, amounts expected to be
      dalam jaminan nilai residu dan harga eksekusi             payable under a residual value guarantee and
      opsi beli, opsi perpanjangan atau penalti                 the exercise price under a purchase option,
      penghentian jika Grup cukup pasti akan                    optional renewal period or penalties for early
      mengeksekusi opsi tersebut.                               termination of a lease unless the Group is
                                                                reasonably certain not to terminate early.

      Grup mengakui aset hak guna dan liabilitas                The Group recognizes a right-of-use asset and
      sewa pada tanggal dimulainya sewa. Aset hak               a lease liability at the lease commencement
      guna awalnya diukur pada biaya perolehan,                 date. The right-of-use asset is initially
      yang terdiri dari jumlah pengukuran awal dari             measured at cost, which comprises the initial
      liabilitas   sewa      disesuaikan    dengan              amount of the lease liability adjusted for any
      pembayaran sewa yang dilakukan pada atau                  lease payments made at or before the
      sebelum tanggal permulaan, ditambah                       commencement date, plus any initial direct
      dengan      biaya    langsung    awal   yang              costs incurred and an estimate of costs to
      dikeluarkan, dan estimasi biaya untuk                     dismantle and remove the underlying asset or
      membongkar        dan    memindahkan     aset             to restore the underlying asset or the site on
      pendasar atau untuk merestorasi aset                      which it is located, less any lease incentives
      pendasar atau lokasi aset berada, dikurangi               received. After the commencement date, the
      insentif sewa yang diterima. Setelah tanggal              Group shall measure the right-of-use asset
      permulaan, Grup mengukur aset hak guna                    applying a cost model.
      dengan menerapkan model biaya.

      Jika sewa mengalihkan kepemilikan aset                    If the lease transfers the ownership of the
      pendasar pada akhir masa sewa atau jika                   underlying asset at the end of the lease term,
      biaya perolehan aset hak guna merefleksikan               then the asset will be depreciated from the
      penyewa akan mengeksekusi opsi beli, maka                 beginning of the lease term to the end of the
      penyewa menyusutkan aset hak guna dari                    underlying asset’s useful life. The depreciation
      tanggal permulaan hingga akhir umur manfaat               periods for the right-of-use assets with
      aset pendasar. Periode penyusutan untuk                   purchase options should refer to the policy for
      aset hak guna dengan opsi beli yang                       the property, plant and equipment.
      dieksekusi tersebut mengacu pada ketentuan
      masa manfaat aset tetap.

      Liabilitas sewa awalnya diukur pada nilai kini            The lease liability is initially measured at the
      atas pembayaran sewa yang belum dibayar                   present value of the lease payments that are
      pada tanggal permulaan, didiskontokan                     not yet paid at the commencement date,
      menggunakan suku bunga implisit dalam                     discounted using the interest rate implicit in
      sewa atau, jika suku bunga tersebut tidak                 the lease or, if that rate cannot be readily
      dapat ditentukan, digunakan suku bunga                    determined,     the      Group’s     incremental
      pinjaman inkremental Grup. Umumnya, Grup                  borrowing rate. Generally, the Group uses its
      menggunakan       suku    bunga    pinjaman               incremental borrowing rate as the discount
      inkremental sebagai suku bunga diskonto.                  rate.
      Setelah tanggal permulaan, Grup mengukur                  After the commencement date, the Group
      liabilitas sewa dengan:                                   shall measure the lease liability by:
      a. Meningkatkan jumlah tercatat untuk                     a. Increasing the carrying amount to reflect
          merefleksikan bunga atas liabilitas sewa;                  interest on the lease liability;
      b. Mengurangi       jumlah  tercatat      untuk           b. Reducing the carrying amount to reflect
          merefleksikan sewa yang telah dibayar;                     the lease payments made; and
          dan
      c. Mengukur kembali jumlah tercatat untuk                 c.   Remeasuring the carrying amount to
          merefleksikan penilaian kembali atau                       reflect any reassessment or lease
          modifikasi sewa atau untuk merefleksikan                   modifications, or to reflect revised in-
                                                           41

Page 51
PT WIJAYA KARYA (PERSERO) Tbk                                                 PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                           AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                    FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                         For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                  June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                                And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                               Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                             (In Thousand Rupiah, unless Otherwise Stated)
          pembayaran sewa tetap secara substansi                          substance fixed lease payments.
          revisian.

      Liabilitas sewa diukur kembali ketika ada                       Lease liabilities remeasured when there is a
      perubahan pembayaran sewa masa depan                            change in future lease payments arising from
      yang timbul dari perubahan indeks atau suku                     a change in an index or rate, if there is a
      bunga, jika ada perubahan estimasi Grup atas                    change in the Group estimate of the amount
      jumlah yang diperkirakan akan dibayar dalam                     expected to be payable under a residual value
      jaminan nilai residual, atau jika Grup                          guarantee, or if the Group changes its
      mengubah      penilaiannya   apakah    akan                     assessment of whether it will exercise a
      mengeksekusi opsi beli, perpanjangan atau                       purchase, extension or termination option.
      penghentian.

      Ketika liabilitas sewa diukur kembali dengan                    When the lease liability is remeasured in this
      cara ini, penyesuaian terkait dilakukan                         way, a corresponding adjustment is made to
      terhadap jumlah tercatat aset hak guna, atau                    the carrying amount of the right-of-use assets,
      dicatat dalam laba rugi jika jumlah tercatat                    or is recorded in profit or loss if the carrying
      aset hak guna telah berkurang menjadi nol.                      amount of the right-of-use asset has been
                                                                      reduced to zero.

      Grup menerapkan pengecualian untuk sewa                         The Group apply the exemption for low-value
      jangka pendek dan sewa aset bernilai rendah                     assets on a lease-by-lease basis and for all
      berdasarkan sewa per sewa.                                      other leases of low value asset.

      Sewa jangka pendek adalah sewa dengan                           Short-term leases are leases with a lease term
      masa sewa kurang dari atau sama dengan 12                       of 12 months or less. Low-value assets are
      bulan. Sewa aset bernilai rendah adalah sewa                    those of general equipments which comprise
      untuk perlengkapan umum seperti komputer,                       of computers, tablets, mobile phones and
      laptop, telepon genggam, dan perlengkapan                       small items of office supplies, and other assets
      kantor lainnya, serta aset lain yang harga                      which have value less than the maximum
      barunya tidak lebih dari plafon nilai rendah                    amount of low value set in the Group’s policy.
      yang ditetapkan oleh Grup.

      Selanjutnya, pembayaran atas kontrak yang                       Furthermore, payments associated with
      termasuk ke dalam pengecualian tersebut,                        contracts included in those exception, are
      diakui sebagai beban dengan menggunakan                         recognized as an expense on a straight-line
      metode garis lurus selama masa sewa.                            basis over the lease term.

2.p. Aset Kerja Sama Operasi                                    2.p. Joint Operation Assets
     Aset kerja sama operasi merupakan aset atas                     The assets of joint operation is an asset of the
     kerja sama dengan pihak ketiga dengan                           cooperation with a third party under the Build
     sistem Bangun Kelola Serah, Grup mencatat                       Operate Transfer system, the Group records
     aset kerja sama operasi sebesar harga                           the assets of joint operation at cost at the time
     perolehan     pada      saat    melakukan                       of construction. The asset is depreciated
     pembangunan. Aset tersebut dilakukan                            during the term of the cooperation agreement.
     penyusutan selama masa perjanjian kerja
     sama.

2.q. Aset Takberwujud                                           2.q. Intangible Assets
     Merek Dagang dan Hak Paten                                      Trademark and Patent
     Aset takberwujud diukur sebesar nilai                           Intangible assets are measured on initial
     perolehan pada pengakuan awal. Nilai                            recognition at cost. The cost of intangible
     perolehan aset takberwujud yang diperoleh                       assets acquired from business combinations is
     dari kombinasi bisnis pada awalnya diakui                       initially recognized at fair value as at the date of
     sesuai nilai wajar pada tanggal akuisisi.                       acquisition. Following initial recognition,
     Setelah pengakuan awal, aset takberwujud                        intangible assets are carried at cost less any

                                                           42

Page 52
PT WIJAYA KARYA (PERSERO) Tbk                                            PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                      AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                   NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                               FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                   For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                            June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                          And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                         Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                       (In Thousand Rupiah, unless Otherwise Stated)
     dicatat pada nilai perolehan dikurangi                     accumulated         amortization  and     any
     akumulasi amortisasi dan akumulasi rugi                    accumulated impairment losses. The useful
     penurunan nilai.      Umur    manfaat aset                 lives of intangible assets are assessed to be
     takberwujud dinilai apakah terbatas atau tidak             either finite or indefinite.
     terbatas.

     Aset takberwujud dengan umur manfaat tidak                 Intangible assets with indefinite useful lives are
     terbatas tidak diamortisasi. Masa manfaat aset             not amortized. The useful life of an intangible
     takberwujud dengan umur tidak terbatas                     asset with an indefinite useful life is reviewed
     ditinjau setiap tahun untuk menentukan                     annually to determine whether the useful life
     apakah masa manfaat masih mendukung dan                    assessment continues to be supportable and
     terdapat suatu indikasi bahwa nilai tercatatnya            when circumstances indicate that the carrying
     mungkin mengalami penurunan nilai.                         amount may be impaired.

     Perangkat Lunak                                            Software
     Perangkat lunak diamortisasi dengan metode                 Software is amortized using the straight-line
     garis lurus berdasarkan taksiran masa                      method based on the estimated useful life.
     manfaat ekonomis.

     Hak Pengusahaan Jalan Tol dan Pengelolaan                  Toll Road Concession Right and Water
     Saluran Air                                                Channel Management
     Grup telah menerapkan ISAK 112, “Perjanjian                The Group has adopted ISAK 112, “Service
     Konsesi Jasa” (ISAK 112) dan ISAK 229,                     Concession Arrangement” (ISAK 112) and
     “Perjanjian Konsesi Jasa Pengungkapan”                     ISAK 229, “Service Concession Arrangement
     (ISAK 229).                                                Disclosure” (ISAK 229).

     ISAK 112 mengatur prinsip umum dalam                       ISAK 112 establishes the general principles in
     pengakuan dan pengukuran hak dan                           the recognition and measurement of rights and
     kewajiban terkait dengan perjanjian konsesi                liabilities related to service concession
     jasa. ISAK 112 mengatur bahwa infrastruktur                arrangement. ISAK 112 regulates that an
     tidak diakui sebagai aset tetap operator (pihak            operator (concession right beneficiary) does
     penerima konsesi jasa) karena perjanjian jasa              not recognize any infrastructure assets
     kontraktual tidak memberikan hak kepada                    because the contractual service arrangement
     operator untuk mengendalikan penggunaan                    does not convey the right to control the use of
     infrastruktur jasa publik. Operator memiliki               the public service infrastructure to the operator.
     akses untuk mengoperasikan infrastruktur                   The operator has access to operate the
     dalam menyediakan jasa publik untuk                        infrastructure to provide the public service on
     kepentingan pemberi konsesi sesuai dengan                  behalf of the grantor in accordance with the
     persyaratan yang ditentukan dalam kontrak.                 terms specified in the contract.

     ISAK 229 memberikan panduan spesifik                       ISAK 229 provides specific guidance for
     mengenai pengungkapan yang diperlukan                      the required disclosures regarding the service
     atas perjanjian konsesi jasa.                              concession arrangement.

     Grup membukukan perjanjian konsesi jasa                    The Group accounts for the service concession
     sebagai model aset takberwujud karena                      agreement as an intangible asset model
     memiliki hak (lisensi) untuk membebankan                   because it has the right (license) to charge
     biaya kepada pengguna jasa publik. Pada saat               users for public services. At initial recognition,
     pengakuan awal, aset konsesi dicatat pada                  concession assets are recorded at the fair value
     nilai wajar dari imbalan yang diterima atau                of the consideration received or to be received.
     akan diterima. Aset konsesi ini adalah aset                The concession assets are toll road
     hak pengelolaan jalan tol dan pengelolaan air.             management rights and water management
     Selama masa konstruksi, akumulasi biaya                    rights. During the construction period, the
     perolehan dan konstruksi jalan tol diakui                  accumulated acquisition and construction costs
     sebagai aset konsesi dalam penyelesaian.                   of toll roads are recognized as concession
     Amortisasi mulai dibebankan pada saat aset                 assets in progress. Amortization begins to be

                                                           43

Page 53
PT WIJAYA KARYA (PERSERO) Tbk                                            PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                      AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                   NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                               FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                   For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                            June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                          And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                         Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                       (In Thousand Rupiah, unless Otherwise Stated)
     konsesi tersebut siap digunakan.                           charged when the concession assets are ready
                                                                for use.

     Aset konsesi akan dihentikan pengakuannya                  The concession assets are derecognized at the
     pada saat berakhirnya masa konsesi. Tidak                  end of the concession period. There will be no
     akan ada keuntungan atau kerugian saat                     gain or loss upon derecognition as the
     penghentian pengakuan karena aset konsesi                  concession assets which are expected to be
     diharapkan telah diamortisasi secara penuh,                fully amortized by then, will then be handed
     akan diserahkan kepada Badan Pengatur                      over to the Badan Pengatur Jalan Tol (BPJT)
     Jalan Tol (BPJT) dan Penanggung Jawab                      and Collaborative Project Authority (PJPK) for
     Proyek Kerjasama (PJPK) tanpa syarat.                      no consideration.

     Aset konsesi yang diberikan kepada Grup                    Concession assets granted to the Group are
     dapat dipindahkan dengan persetujuan                       transferrable    with   approval   from    the
     Pemerintah/BPJT dan PJPK. Aset konsesi ini                 Government/BPJT        and    PJPK.     These
     akan diserahkan ke Pemerintah/ BPJT dan                    concession right assets will be transferred to
     PJPK pada saat akhir masa konsesi dan, pada                the Government/ BPJT and PJPK at the end of
     saat itu, seluruh akun yang berhubungan                    the concession period and, at such time, all
     dengan aset konsesi akan dihentikan                        accounts related to the concession rights
     pengakuannya.                                              assets will be derecognized.

     Selama periode hak pengusahaan jalan tol                   During the period of toll road concession rights
     dan pengelolaan saluran air, aset hak                      and water channel management, toll road
     pengusahaan jalan tol dan pengelolaan                      concession rights and waterway management
     saluran air dapat dikeluarkan dari laporan                 rights assets may be excluded from the Group's
     posisi keuangan konsolidasian Grup jika jalan              consolidated statement of financial position if
     tol dan saluran air diserahkan (dikuasakan)                the toll roads and waterways are handed over
     kepada pihak lain atau Pemerintah/ BPJT atau               (authorized)     to   other   parties   or   the
     PJPK mengubah status aset konsesi atau                     Government/BPJT or PJPK changes the status
     tidak ada manfaat ekonomi yang dapat                       of concession asset so that no economic
     diharapkan dari penggunaannya. Keuntungan                  benefits can be expected from its use. Gains or
     atau kerugian yang timbul dari penghentian                 losses arising from the termination or disposal
     atau pelepasan aset konsesi diakui sebagai                 of concession assets are recognized as gains
     keuntungan atau kerugian dalam laporan laba                or losses in the consolidated statements of
     rugi dan penghasilan komprehensif lain                     profit or loss and other comprehensive income.
     konsolidasian.

     Selain itu, Grup mengakui dan mengukur                     In addition, the Group recognizes and
     pendapatan konstruksi dan jasa yang                        measures revenue for construction and
     dilakukan sesuai dengan “Pendapatan dari                   services performed in accordance with
     Kontrak Pelanggan”, PSAK 115. Ketika Grup                  “Revenue from Customer Contracts”, PSAK
     menyediakan       jasa    konstruksi    atau               115. When the Group provides construction or
     peningkatan kemampuan, imbalan yang                        capacity building services, the consideration
     diterima atau akan diterima oleh Grup diakui               received or will be received by the Group is
     pada nilai wajar.                                          recognized at fair value.

     Kontrak konstruksi meliputi seluruh biaya                  The construction contract covers all costs
     konstruksi pembangunan jalan tol atau                      incured for the development of toll roads or
     peningkatan kapasitas jalan tol dan saluran air            capacity building for toll roads and waterways
     yang meliputi pengadaan tanah, studi                       which include land acquisition, feasibility
     kelayakan dan biaya-biaya lain yang                        studies and other costs directly related to the
     berhubungan langsung dengan pembangunan                    construction of toll roads and waterways,
     jalan tol dan saluran air, termasuk biaya                  including            the          costs         of
     pembangunan jalan akses ke jalan tol dan                   constructing access roads to toll roads and
     saluran air, jalan alternatif dan fasilitas jalan          canals. Water, alternative roads and required
     umum yang disyaratkan, ditambah biaya                      public road facilities, plus other borrowing costs

                                                           44

Page 54
PT WIJAYA KARYA (PERSERO) Tbk                                            PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                      AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                   NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                               FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                   For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                            June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                          And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                         Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                       (In Thousand Rupiah, unless Otherwise Stated)
     pinjaman lain yang secara langsung maupun                  that are directly or indirectly used to finance the
     tidak langsung digunakan untuk mendanai                    process of building these assets. Borrowing
     proses pembangunan aset tersebut. Biaya                    costs are capitalized until the construction
     pinjaman dikapitalisasi sampai dengan saat                 process is complete and the concession assets
     proses pembangunan tersebut telah selesai                  are ready for operation.
     dan aset konsesi telah siap untuk
     dioperasikan.

     Grup mengakui biaya jasa konstruksi dan                    The Group recognizes construction services
     peningkatan     kemampuan      aset   konsesi              and increased capacity of concession asset as
     sebagai aset tak berwujud dimana Grup                      intangible assets which the Group receives the
     menerima hak (lisensi) untuk membebankan                   rights (license) to charge users of public
     pengguna jasa publik. Suatu hak untuk                      services. A right to charge users of public
     membebankan pengguna jasa publik bukan                     services is not an unconditional right to receive
     merupakan hak tanpa syarat untuk menerima                  cash because the amounts depend on the
     kas karena jumlahnya bergantung pada                       extent of public using the service. During the
     sejauh mana publik menggunakan jasa.                       construction period, the Group records
     Selama periode konstruksi, Grup mencatat                   intangible assets, and recognizes revenues and
     aset takberwujud dan mengakui pendapatan                   costs of construction in accordance with the
     dan     biaya konstruksi sesuai dengan                     contract. Construction cost is the value of
     kontraknya. Biaya konstruksi merupakan nilai               acquisition of the construction contract.
     dari jumlah perolehan kontrak konstruksi.

     Biaya bunga dan biaya pinjaman lainnya,                    Interest and other borrowing costs, such as
     seperti diskonto baik yang secara langsung                 discount fees on loans either directly or
     ataupun tidak langsung digunakan untuk                     indirectly used in financing the construction of a
     mendanai      proses     pembangunan        aset           qualifying asset, are capitalized up to the date
     kualifikasian (qualifying assets), dikapitalisasi          when the construction is completed. For
     sampai saat proses pembangunannya selesai.                 borrowings directly attributable to a qualifying
     Untuk pinjaman yang dapat dihubungkan                      asset, the amount allowed to be capitalized is
     secara langsung dengan suatu aset tertentu,                determined as the actual borrowing costs
     jumlah yang dapat dikapitalisasi adalah                    incurred during the period, less any investment
     sebesar biaya pinjaman yang terjadi dalam                  income earned from the temporary investment
     periode      berjalan,     dikurangi    dengan             of such borrowings.
     penghasilan      investasi    sementara      dari
     pinjaman tersebut.

     Hak konsesi ruas jalan tol diamortisasi selama             Toll road concession rights are amortized over
     masa konsesi dengan menggunakan metode                     the concession period using the following
     sebagai berikut:                                           method:
      i. Aset hak pengusahaan jalan tol untuk jalan             i. Toll road concession rights for toll roads
         dan jembatan tol diamortisasi dengan                       and toll bridges are amortized using unit of
         menggunakan metode unit pemakaian                          usage method based on traffic volume.
         berdasarkan volume lalu lintas.
     ii. Aset hak pengusahaan jalan tol selain jalan            ii. Toll road concession rights aside from toll
         dan jembatan tol diamortisasi dengan                       roads and toll bridges are amortized using
         menggunakan metode garis lurus.                            straight line method.

     Aset jalan tol terdiri dari jalan dan jembatan,            Toll road assets consisting of roads and
     gerbang dan bangunan pelengkap jalan tol                   bridges, gates and complementary building toll
     dan sarana pelengkap jalan tol dicatat sebagai             roads and toll supplementary facilities are
     aset hak pengusahaan jalan tol yang                        recorded as toll road concession rights which
     dinyatakan sebesar nilai wajar pada tanggal                are stated at fair value at the date of revaluation
     revaluasian dikurangi akumulasi penyusutan                 less     accumulated          depreciation     and
     dan akumulasi rugi penurunan nilai yang                    accumulated impairment losses that occur after
     terjadi setelah tanggal revaluasi.                         the date of revaluation.

                                                           45

Page 55
PT WIJAYA KARYA (PERSERO) Tbk                                                 PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                           AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                    FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                         For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                  June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                                And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                               Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                             (In Thousand Rupiah, unless Otherwise Stated)
     Amortisasi aset jalan dan jembatan dilakukan                    Amortization of roads and bridges assets is
     dengan menggunakan metode unit produksi                         calculated using the unit of production (the
     (jumlah lalu lintas kendaraan-kendaraan)                        amount of vehicle traffic volume) during the
     selama masa hak pengusahaan jalan tol                           period of the concession (concession period).
     (masa konsesi). Sedangkan aset hak                              While the toll road concession rights assets
     pengusahaan jalan tol selain jalan dan                          other than roads and bridges are amortized
     jembatan diamortisasi selama periode yang                       over the shorter period between the period of
     lebih pendek antara masa hak pengusahaan                        concession (concession period) and the useful
     jalan tol (masa konsesi) dan umur manfaat                       life of the asset.
     aset.

     Aset takberwujud dihentikan pengakuannya                        Intangible assets are derecognized when
     jika dilepas atau ketika tidak terdapat lagi                    removed or when there are no further future
     manfaat    ekonomi masa depan yang                              economic benefits are expected from its use or
     diperkirakan   dari   penggunaannya    atau                     disposal. Gains or losses arising from
     pelepasannya. Keuntungan atau kerugian                          derecognition of an intangible asset is
     yang muncul dari penghentian pengakuan                          determined as the difference between the net
     aset takberwujud ditentukan sebagai selisih                     disposal proceeds (if any) and the carrying
     antara hasil neto pelepasan (jika ada) dan                      amount of assets. Gains or losses are
     jumlah tercatat aset. Keuntungan atau                           recognized in profit or loss when the asset is
     kerugian diakui dalam laba rugi ketika aset                     derecognized. Gains are recognized as other
     tersebut      dihentikan      pengakuannya.                     income.
     Keuntungan diakui sebagai penghasilan lain-
     lain.

2.r. Penurunan Aset Nonkeuangan kecuali                         2.r. Impairment of Nonfinancial Assets except
     Goodwill                                                        Goodwill
     Pada setiap akhir periode pelaporan, Grup                        At the end of the reporting period, the Group will
     akan melakukan penilaian apakah terdapat                         assess whether there is an indication of asset
     indikasi aset mengalami penurunan nilai. Jika                    impairment. If such indication exists, the assets
     terdapat indikasi tersebut, maka Grup                            of the Group estimates the recoverable amount
     mengestimasi jumlah terpulihkan aset tersebut                    of the asset’s cash-generating unit the
     atau unit penghasil kas dari aset tersebut.                      recoverable amount is the higher amount
     Jumlah terpulihkan adalah jumlah yang lebih                      between the fair value less costs to sell and
     tinggi antara nilai wajar dikurangi biaya untuk                  value in use. If the recoverable amount of an
     menjual dan nilai pakainya. Jika jumlah                          asset is less than its carrying amount, the
     terpulihkan suatu aset lebih kecil dari nilai                    carrying amount of an asset should be reduced
     tercatatnya,    nilai   tercatat  aset    harus                  to its recoverable amount. Impairment loss is
     diturunkan     menjadi       sebesar     jumlah                  recognized immediately in profit or loss.
     terpulihkan. Kerugian penurunan nilai diakui
     segera dalam laba rugi.

     Pemulihan rugi penurunan nilai aset yang                       Recovery of impairment losses of assets which
     telah diakui pada periode sebelumnya dicatat                   have been recognized in prior periods are
     jika terdapat indikasi penurunan nilai aset                    recorded when there is indication of impairment
     tersebut sudah tidak ada lagi atau menurun.                    of the asset no longer exists or decreases.
     Pemulihan rugi penurunan nilai aset diakui                     Recovery of impairment losses of assets
     dalam laba rugi. Namun demikian, kenaikan                      recognized in the profit or loss. However, the
     nilai tercatat aset karena pemulihan rugi                      increase in the carrying value of assets due to
     penurunan nilai hanya diakui sepanjang tidak                   the recovery of an impairment loss is
     melebihi nilai tercatat yang ditentukan (setelah               recognized only if it is not exceed the carrying
     dikurangi penyusutan dan amortisasi) jika rugi                 amount that would had been determined (after
     penurunan nilai aset tidak diakui pada tahun                   deducting depreciation and amortization) if no
     sebelumnya.                                                    impairment losses of assets recognized in prior
                                                                    years.


                                                           46

Page 56
PT WIJAYA KARYA (PERSERO) Tbk                                                   PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                             AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                          NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                      FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                          For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                   June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                                 And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                                Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                              (In Thousand Rupiah, unless Otherwise Stated)
2.s. Sukuk                                                       2.s. Sukuk
     Sukuk adalah efek syariah berupa sertifikat                      Sukuk are the sharia securities represented by a
     atau bukti kepemilikan yang bernilai sama dan                    certificate or evidence of ownership of equal
     mewakili bagian yang tidak tertentu (tidak                       denomination and representing individual
     terpisahkan atau tidak terbagi) atas: (a). aset                  ownership interest in (not separated or divided):
     berwujud tertentu; (b). manfaat atas aset                        (a). particular intangible assets; (b). existing or
     berwujud tertentu baik yang sudah ada                            future benefits of particular intangible assets; (c).
     maupun yang akan ada; (c). jasa yang sudah                       existing or future services; (d). particular project
     ada maupun yang akan ada; (d). aset proyek                       assets; or (e). determined investment activity.
     tertentu; atau (e). kegiatan investasi yang telah
     ditentukan.

     Sukuk mudharabah adalah sukuk yang                              Sukuk mudarabah is sukuk using a mudarabah’s
     menggunakan akad mudharabah.                                    contract.
     Grup sebagai Penerbit                                           The Group as Issuer
     Sukuk mudharabah diakui saat Grup menjadi                       Sukuk Mudarabah is recognized when the Group
     pihak    yang   terikat   dengan    ketentuan                   becomes a party bound by the provisions of
     penerbitan    sukuk     mudharabah.     Sukuk                   sukuk     mudharabah     issuance.     Sukuk
     mudharabah diakui sebesar nilai nominal.                        mudharabah is recognized at its nominal
                                                                     amount.

     Biaya transaksi diakui secara terpisah dari                     A transaction cost is recognized separately from
     sukuk mudharabah dan disajikan dalam aset                       sukuk mudarabah and is presented in assets as
     sebagai beban tangguhan, bukan sebagai pos                      deferred expense, rather than a contra account
     lawan dari sukuk mudharabah. Biaya transaksi                    of sukuk mudarabah. Transaction cost is
     diamortisasi secara garis lurus selama jangka                   amortized on straight-line basis over the terms of
     waktu sukuk mudharabah.                                         sukuk mudharabah.

     Bagi hasil yang menjadi hak pemilik sukuk                       A return entitled for the holder of sukuk
     mudarabah     diakui  sebagai    pengurang                      mudarabah is recognized as a deduction of
     pendapatan, bukan sebagai beban.                                revenues, rather than an expense.

     Karena bukan merupakan entitas syariah, Grup                    Since the Group is not a sharia entity, it does not
     tidak menyajikan sukuk mudarabah sebagai                        present sukuk mudarabah as a temporary
     dana syirkah temporer yang secara terpisah                      shirkah funds separately from liabilities and
     dari liabilitas dan ekuitas, tetapi disajikan                   equity, but presented in a separate liability of
     dalam liabilitas yang terpisah dari liabilitas lain.            other liabilities. Sukuk mudarabah is presented
     Sukuk mudharabah disajikan dalam urutan                         at the last in the sequence of liabilities.
     paling akhir dalam liabilitas.

2.t. Pengakuan Pendapatan dan Beban                              2.t. Revenue and Expense Recognition
     Dalam menentukan pengakuan pendapatan,                           In determining revenue recognition, the Group
     Grup melakukan analisa transaksi melalui lima                    performs analysis transaction through the
     langkah analisis berikut:                                        following five steps of assessment:
     1. Identifikasi kontrak dengan pelanggan,                        1. Identify contracts with customers with certain
        dengan kriteria sebagai berikut:                                  criteria as follows:
         - Kontrak telah disetujui oleh pihak-pihak                       -    The contract has been agreed by the
           terkait dalam kontrak                                               parties involved in the contract
         - Grup dapat mengidentifikasi hak dari                           -    The Group can identify the rights of
           pihak-pihak terkait dan jangka waktu                                relevant parties and the term of payment
           pembayaran dari barang atau jasa yang                               for the goods or services to be
           akan dialihkan                                                      transferred
         - Kontrak memiliki substansi komersial                           -    The contract has commercial substance
         - Besar kemungkinan entitas akan                                 -    It is probable that the Group will receive
           menerima imbalan atas barang atau                                   benefits for the goods or services
           jasa yang dialihkan                                                 transferred

                                                            47

Page 57
PT WIJAYA KARYA (PERSERO) Tbk                                            PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                      AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                   NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                               FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                    For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                             June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                           And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                          Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                        (In Thousand Rupiah, unless Otherwise Stated)
     2. Mengidentifikasi kewajiban pelaksanaan                  2. Identify the performance obligations in the
        dalam kontrak, untuk menyerahkan barang                    contract, to transfer distinctive goods or
        atau jasa yang memiliki karakteristik yang                 services to the customer.
        berbeda ke pelanggan.
     3. Menentukan harga transaksi, setelah                     3. Determine the transaction price, net of
        dikurangi diskon, retur, insentif penjualan,               discounts, returns, sales incentives, luxury
        pajak penjualan barang mewah, pajak                        sales tax, value added tax and export duty,
        pertambahan nilai dan pungutan ekspor,                     which an entity expects to be entitled in
        yang berhak diperoleh suatu entitas                        exchange for transferring promised goods or
        sebagai kompensasi atas diserahkannya                      services to a customer.
        barang atau jasa yang dijanjikan ke
        pelanggan.
     4. Mengalokasikan harga transaksi kepada                   4. Allocate the transaction price to each
        setiap kewajiban pelaksanaan dengan                        performance obligation on the basis of the
        menggunakan dasar harga jual dari setiap                   selling prices of each goods or services
        barang atau jasa yang dijanjikan di kontrak.               promised in the contract.
     5. Mengakui pendapatan ketika kewajiban                    5. Recognize revenue when the performance
        pelaksanaan telah dipenuhi (sepanjang                      obligation is satisfied (over time or at a point
        waktu atau pada suatu waktu tertentu).                     in time).

     Kewajiban pelaksanaan dapat dipenuhi dengan                A performance obligation may be satisfied at
     cara sebagai berikut:                                      the following:
     - Suatu waktu tertentu (umumnya janji untuk                - A point in time (typically for promises to
        menyerahkan barang ke pelanggan); atau                      transfer goods to a customer); or
     - Sepanjang waktu (umumnya janji untuk                     - Over time (typically for promises to transfer
        menyerahkan jasa ke pelanggan). Untuk                       services to a customer). For a performance
        kewajiban pelaksanaan yang dipenuhi                         obligation   satisfied   over     time,   the
        sepanjang waktu, Grup memilih ukuran                        Group       selects      an       appropriate
        penyelesaian yang sesuai untuk penentuan                    measure of progress to determine the
        jumlah pendapatan yang harus diakui                         amount of revenue that should be
        karena telah terpenuhinya kewajiban                         recognized as the performance obligation is
        pelaksanaan.                                                satisfied.

     Suatu kewajiban pelaksanaan dipenuhi pada                  A performance obligation is satisfied at a point
     suatu waktu tertentu kecuali jika memenuhi                 in time unless it meets one of the following
     salah satu kriteria berikut, dalam hal ini                 criteria, in which case it is satisfied over time:
     dipenuhi dari sepanjang waktu:
     - Pelanggan secara bersamaan menerima                      -   The customer simultaneously receives and
        dan menggunakan manfaat yang diberikan                      consumes the benefits provided by the
        oleh pelaksanaan Grup sebagaimana yang                      Group’s performance as the Group
        dilakukan Grup;                                             performs;
     - Pelaksanaan Grup menciptakan atau                        -   The Group’s performance creates or
        meningkatkan aset yang dikendalikan                         enhances an asset that the customer
        pelanggan saat aset itu dibuat atau                         controls as the asset is created or
        ditingkatkan; dan                                           enhanced; and
     - Pelaksanaan Grup tidak menciptakan aset                  -   The Group’s performance does not create
        dengan penggunaan alternatif untuk Grup                     an asset with an alternative use to the
        dan Grup memiliki hak yang dapat                            Group and the Group has an enforceable
        diberlakukan atas pembayaran untuk                          right to payment for performance completed
        pelaksanaan yang diselesaikan hingga saat                   to date.
        ini.
                                                                -


     Kriteria berikut ini juga harus dipenuhi sebelum           The following recognition criteria must also be
     pendapatan diakui.                                         met before revenue is recognized.



                                                           48

Page 58
PT WIJAYA KARYA (PERSERO) Tbk                                            PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                      AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                   NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                               FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                    For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                             June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                           And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                          Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                        (In Thousand Rupiah, unless Otherwise Stated)
     Pendapatan Konstruksi dan Beban Konstruksi                 Construction Revenues and Construction Costs
     Pendapatan yang berhubungan dengan                         Revenues related to construction contracts are
     kontrak konstruksi diakui sepanjang waktu                  recognized over time which accounted for using
     yang dicatat dengan menggunakan metode                     the percentage of completion method. Under
     persentase penyelesaian. Dengan metode ini,                this method, the revenue recognized equals the
     pendapatan yang diakui setara dengan                       latest estimate of the total value of the contract
     estimasi terbaru dari total nilai kontrak dikalikan        multiplied by the actual completion rate
     dengan tingkat penyelesaian sebenarnya yang                determined by reference to the physical state of
     ditentukan dengan mengacu pada keadaan                     progress of the works.
     fisik kemajuan pekerjaan.

     Pendapatan kontrak terdiri dari jumlah                     Contract revenue comprises the initial amount
     pendapatan semula yang disetujui dalam                     of revenue that agreed in the contract and
     kontrak dan penyimpangan dalam pekerjaan                   variations in contract work, claims, and
     kontrak, klaim, dan pembayaran insentif                    incentive payments to the extent that is
     sepanjang hal ini memungkinkan untuk                       probable that it will result in revenue and can be
     menghasilkan pendapatan dan dapat diukur                   realiably measured.
     dengan andal.

     Jika adanya kemungkinan bahwa kontrak akan                 If it is regarded as probable that a contract will
     menghasilkan       kerugian       pada      saat           generate a loss on completion, a provision for
     penyelesaian     kontrak,    penyisihan     atas           expected losses to completion is recognized as
     kerugian     yang       diperkirakan     hingga            a current provision in the consolidated financial
     penyelesaian      kontrak     diakui    sebagai            statements. The loss is provided for in full as
     penyisihan kini pada laporan keuangan                      soon as it is can be reliably measured,
     konsolidasian. Kerugian diakui secara penuh                irrespective of the completion rate.
     ketika dapat diukur secara andal, terlepas dari
     tingkat penyelesaian.

     Biaya kontrak yang tidak mungkin dipulihkan                Contract costs that are not probable of being
     diakui segera sebagai beban tahun berjalan                 recovered are recognized as current year
     pada laba rugi.                                            expenses in profit or loss.

     Biaya yang secara langsung berhubungan                     The costs that directly relate to the contract
     dengan kontrak, menghasilkan sumber daya                   generate resources to satisfy the contract (“cost
     untuk memenuhi kontrak ("biaya untuk                       to fulfill“) or is incremental on obtaining a
     memenuhi")     atau    penambahan      untuk               contract (“cost to obtain”) and are expected to
     mendapatkan      kontrak     ("biaya   untuk               be recovered. These costs are therefore eligible
     memperoleh")     dan     diharapkan    dapat               for capitalization under PSAK 115: Revenue
     dipulihkan. Beban tersebut dengan demikian                 from Contracts with Customers and recognized
     memenuhi syarat kapitalisasi berdasarkan                   as other current assets. Such cost will be
     PSAK 115: Pendapatan dari Kontrak dengan                   amortized on a systematic basis that is
     Pelanggan dan dicatat sebagai aset lancar                  consistent with the transfer of the goods or
     lainnya. Beban tersebut diamortisasi dengan                services to which such asset relates.
     cara sistematis sejalan dengan penyerahan
     barang atau jasa yang terkait dengan aset
     tersebut.

     Beban langsung dan beban tidak langsung                    Direct and indirect costs of projects which can
     proyek yang dapat dialokasikan ke suatu                    be allocated to a particular project, are
     proyek tertentu, diakui sebagai beban pada                 recognized as an expense on the related
     proyek yang bersangkutan, sedangkan beban                  projects, while the expenses that cannot be
     yang tidak dapat didistribusikan atau tidak                distributed or cannot be allocated to the project
     dapat dialokasikan ke aktivitas proyek menjadi             activities are recognized as non-project
     beban non proyek (beban usaha).                            expenses (operating expenses).


                                                           49

Page 59
PT WIJAYA KARYA (PERSERO) Tbk                                                 PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                           AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                    FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                        For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                 June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                               And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                              Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                            (In Thousand Rupiah, unless Otherwise Stated)
     Penjualan Barang dan Jasa                                      Sales of goods and services
     Pendapatan dari penjualan barang diakui pada                   Revenue from the sale of goods is recognized
     saat pengendalian atas barang telah berpindah                  when the control of goods has been transferred
     kepada pelanggan. Pendapatan jasa diakui                       to the customer. Revenue from the rendering of
     pada    saat   pelanggan    menerima      dan                  service is recognized when the customer has
     mengkonsumsi manfaat dari jasa tersebut.                       received and consumed benefit from the
                                                                    services.

     Hotel dan Restoran                                              Hotel and Restaurant
     Pendapatan hotel dan restoran diakui pada                      Hotel and restaurant revenues are recognized
     saat barang atau jasa diberikan kepada tamu                    when the goods or services provided to hotel
     hotel atau pengunjung restoran. Pendapatan                     guests or restaurant visitors. Revenue club
     uang pangkal dan iuran klub keanggotaan                        tuition and membership fees are deferred
     ditangguhkan     (disajikan    dalam   akun                    (presented under Deferred Income) and
     Pendapatan Ditangguhkan) dan diakui sebagai                    recognized as income over the period of its
     pendapatan     sesuai       dengan   periode                   membership.
     keanggotaannya.

     Real Estat                                                     Real Estate
     Grup memperoleh pendapatan real estatnya                       The Group derives its real estate revenue from
     dari penjualan kavling, rumah dan kavling serta                sale of lots, house and lot and condominium
     unit kondominium. Pendapatan dari penjualan                    units. Revenues from the sale of these real
     proyek real estat ini diakui pada saat ketika                  estate projects are recognized at point in time
     Grup telah mengalihkan risiko dan manfaat                      which is when the Group has already
     kepemilikan yang biasa kepada pembeli dalam                    transferred to the buyer the usual risks and
     suatu transaksi yang secara substansi adalah                   rewards of ownership in a transaction that is in
     penjualan dan tidak memiliki keterlibatan                      substance a sale and does not have a
     berkelanjutan    yang     substansial   dengan                 substantial continuing involvement with the
     properti.                                                      property.

     Pengakuan Beban                                                Expense Recognition
     Biaya yang secara langsung berhubungan                         The costs that directly relate to the contract
     dengan kontrak, menghasilkan sumber daya                       generate resources to satisfy the contract (“cost
     untuk memenuhi kontrak ("biaya untuk                           to fulfill“) or is incremental on obtaining a
     memenuhi")     atau    penambahan      untuk                   contract (“cost to obtain”) and are expected to
     mendapatkan      kontrak     ("biaya   untuk                   be recovered. These costs are therefore eligible
     memperoleh")     dan     diharapkan    dapat                   for capitalization under PSAK 115: Revenue
     dipulihkan. Beban tersebut dengan demikian                     from Contracts with Customers and recognized
     memenuhi syarat kapitalisasi berdasarkan                       as other current assets. Such cost will be
     PSAK 115: Pendapatan dari Kontrak dengan                       amortized on a systematic basis that is
     Pelanggan dan dicatat sebagai aset lancar                      consistent with the transfer of the goods or
     lainnya. Beban tersebut diamortisasi dengan                    services to which such asset relates.
     cara sistematis sejalan dengan penyerahan
     barang atau jasa yang terkait dengan aset
     tersebut.

2.u. Biaya Pinjaman                                             2.u. Borrowing Costs
     Biaya pinjaman yang dapat diatribusikan                         Borrowing costs that are directly attributable to
     langsung dengan perolehan, pembangunan                          the acquisition, construction or production of a
     atau      pembuatan      aset      kualifikasian,               qualifying asset, are capitalized as part of
     dikapitalisasi sebagai bagian biaya perolehan                   the cost of asset. Other borrowing costs are
     aset tersebut. Biaya pinjaman lainnya diakui                    recognized as an expense when incurred.
     sebagai beban pada saat terjadi. Biaya                          Borrowing costs may include interest expense,
     pinjaman dapat mencakup beban bunga,                            finance charges in respect of finance leases, or
     beban keuangan dalam sewa pembiayaan atau                       exchange differences arising from foreign
     selisih kurs yang berasal dari pinjaman dalam                   currency borrowings to the extent that they are

                                                           50

Page 60
PT WIJAYA KARYA (PERSERO) Tbk                                                 PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                           AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                    FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                        For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                 June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                               And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                              Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                            (In Thousand Rupiah, unless Otherwise Stated)
     mata uang asing sepanjang selisih kurs                         regarded as an adjustment to interest costs.
     tersebut diperlakukan sebagai penyesuaian
     atas biaya bunga.

     Kapitalisasi biaya pinjaman dimulai pada saat                  Capitalization of borrowing costs commences
     Grup telah melakukan aktivitas yang diperlukan                 when the Group undertakes activities
     untuk mempersiapkan aset agar dapat                            necessary to prepare the asset for its intended
     digunakan atau dijual sesuai dengan intensinya                 use or sale and expenditures for the asset and
     serta pengeluaran untuk aset dan biaya                         its borrowing costs has been incurred.
     pinjamannya telah terjadi. Kapitalisasi biaya                  Capitalization of borrowing costs ceases when
     pinjaman dihentikan ketika secara substansial                  substantially all the activities necessary to
     seluruh aktivitas yang diperlukan untuk                        prepare the qualifying assets for its intended
     mempersiapkan aset kualifikasian agar dapat                    use or sale are complete.
     digunakan atau dijual sesuai dengan intensinya
     telah selesai.

     Konstruksi yang termasuk dalam perolehan                       Construction included in acquisition of certain
     aset tertentu adalah proyek-proyek pre-                        assets is the pre-financing projects whose
     financing      yang       pembangunannya                       constructions time is required more than one
     membutuhkan waktu lebih dari satu tahun.                       year.

2.v. Pajak Penghasilan                                          2.v. Income Tax
     Beban pajak adalah jumlah gabungan pajak                        The tax expense is the combined amount of
     kini dan pajak tangguhan yang diperhitungkan                    current tax and deferred tax which calculated in
     dalam menentukan laba rugi pada suatu                           determining profit or loss in the period. Current
     periode. Pajak kini dan pajak tangguhan diakui                  tax and deferred tax is recognized in profit or
     dalam laba rugi, kecuali pajak penghasilan                      loss, except for income tax arising from
     yang timbul dari transaksi atau peristiwa yang                  transactions or events that are recognized in
     diakui dalam penghasilan komprehensif lain                      other comprehensive income or directly in
     atau secara langsung di ekuitas. Dalam hal ini,                 equity. In this case, the tax is recognized in
     pajak tersebut masing-masing diakui dalam                       other comprehensive income or equity,
     penghasilan komprehensif lain atau ekuitas.                     respectively.

     Jumlah pajak kini untuk periode berjalan dan                   Current tax for current and prior periods shall,
     periode sebelumnya yang belum dibayar diakui                   to the extent unpaid, be recognised as a
     sebagai liabilitas. Jika jumlah pajak yang telah               liability. If the amount already paid in respect of
     dibayar untuk periode berjalan dan periode-                    current and prior periods exceeds the amount
     periode sebelumnya melebihi jumlah pajak                       due for those periods, the excess shall be
     yang terutang untuk periode tersebut, maka                     recognised as an asset.
     kelebihannya diakui sebagai aset.

     Liabilitas (aset) pajak kini untuk periode                     Current tax liabilities (assets) for the current
     berjalan dan periode sebelumnya diukur                         and prior periods shall be measured at the
     sebesar jumlah yang diperkirakan akan dibayar                  amount expected to be paid to (recovered from)
     kepada (direstitusi dari) otoritas perpajakan,                 the taxation authorities, using the tax rates (and
     yang dihitung menggunakan tarif pajak (dan                     tax laws) that had been enacted or
     undang-undang pajak) yang telah berlaku atau                   substantively enacted by the end of the
     secara substantif telah berlaku pada akhir                     reporting period.
     periode pelaporan.

     Manfaat terkait dengan rugi pajak yang dapat                   Benefits relating to tax loss that can be carried
     ditarik untuk memulihkan pajak kini dari                       back to recover current tax of prior periods is
     periode sebelumnya diakui sebagai aset. Aset                   recognized as an asset. Deferred tax asset is
     pajak tangguhan diakui untuk akumulasi rugi                    recognized for the carryforward of unused tax
     pajak belum dikompensasi dan kredit pajak                      losses and unused tax credit to the extent that it
     belum dimanfaatkan sepanjang kemungkinan                       is probable that future taxable profit will be

                                                           51

Page 61
PT WIJAYA KARYA (PERSERO) Tbk                                            PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                      AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                   NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                               FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                    For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                             June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                           And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                          Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                        (In Thousand Rupiah, unless Otherwise Stated)
     besar laba kena pajak masa depan akan                      available against which the unused tax losses
     tersedia untuk dimanfaatkan dengan rugi pajak              and unused tax credits can be utilized.
     belum dikompensasi dan kredit pajak belum
     dimanfaatkan.

     Seluruh perbedaan temporer kena pajak diakui               A deferred tax liability shall be recognised for all
     sebagai liabilitas pajak tangguhan, kecuali                taxable temporary differences, except to the
     perbedaan temporer kena pajak yang berasal                 extent that the deferred tax liability arises from:
     dari:
     a) Pengakuan awal goodwill; atau                           a) The initial recognition of goodwill; or
     b) Pengakuan awal aset atau liabilitas dari                b) The initial recognition of an asset or liability
         transaksi yang                                              in a transaction which is
          i. Bukan kombinasi bisnis;                                i. Not a business combination;
         ii. Pada       saat      transaksi      tidak              ii. At the time of the transaction affects
              mempengaruhi laba akuntansi atau                            neither accounting profit nor taxable
              laba kena pajak (rugi pajak); dan                           profit (tax loss); and
        iii. Pada saat transaksi tidak menimbulkan                 iii. At the time of the transaction, does not
              perbedaan temporer kena pajak dan                           give rise to equal taxable and deductible
              perbedaan         temporer        dapat                     temporary differences.
              dikurangkan dalam jumlah yang sama.

     Aset pajak tangguhan diakui untuk seluruh                  A deferred tax asset shall be recognised for all
     perbedaan temporer dapat dikurangkan                       deductible temporary differences to the extent
     sepanjang kemungkinan besar laba kena pajak                that it is probable that taxable profit will be
     akan tersedia sehingga perbedaan temporer                  available against which the deductible
     dapat dimanfaatkan untuk mengurangi laba                   temporary difference can be utilised, unless the
     dimaksud, kecuali jika aset pajak tangguhan                deferred tax asset arises from the initial
     timbul dari pengakuan awal aset atau                       recognition of an asset or liability in a
     pengakuan awal liabilitas dalam transaksi yang             transaction that is not a business combination
     bukan kombinasi bisnis dan pada saat                       and at the time of the transaction affects neither
     transaksi tidak mempengaruhi laba akuntansi                accounting profit nor taxable profit (tax loss).
     atau laba kena pajak (rugi pajak).

     Aset dan liabilitas pajak tangguhan diukur                 Deferred tax assets and liabilities are measured
     dengan menggunakan tarif pajak yang                        at the tax rates that are expected to apply to the
     diharapkan berlaku ketika aset dipulihkan atau             period when the asset is realized or the liability
     liabilitas diselesaikan, berdasarkan tarif pajak           is settled, based on tax rates (and tax laws) that
     (dan peraturan pajak) yang telah berlaku atau              had been enacted or substantively enacted by
     secara substantif telah berlaku pada akhir                 the end of the reporting period.
     periode pelaporan.

     Pengukuran aset dan liabilitas pajak tangguhan             The measurement of deferred tax liabilities and
     mencerminkan konsekuensi pajak yang sesuai                 deferred tax assets shall reflect the tax
     dengan cara Grup memperkirakan, pada akhir                 consequences that would follow from the
     periode pelaporan, untuk memulihkan atau                   manner in which the Group expects, at the end
     menyelesaikan jumlah tercatat aset dan                     of the reporting period, to recover or settle the
     liabilitasnya.                                             carrying amount of its assets and liabilities.

     Jumlah tercatat aset pajak tangguhan ditelaah              The carrying amount of a deferred tax asset
     ulang pada akhir periode pelaporan. Grup                   reviewed at the end of each reporting period.
     mengurangi jumlah tercatat aset pajak                      The Group shall reduce the carrying amount of
     tangguhan jika kemungkinan besar laba kena                 a deferred tax asset to the extent that it is no
     pajak tidak lagi tersedia dalam jumlah yang                longer probable that sufficient taxable profit will
     memadai untuk mengkompensasikan sebagian                   be available to allow the benefit of part or all of
     atau seluruh aset pajak tangguhan tersebut.                that deferred tax asset to be utilised. Any such
     Setiap pengurangan tersebut        dilakukan               reduction shall be reversed to the extent that it

                                                           52

Page 62
PT WIJAYA KARYA (PERSERO) Tbk                                                     PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                               AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                            NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                        FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                          For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                   June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                                 And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                                Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                              (In Thousand Rupiah, unless Otherwise Stated)
     pembalikan atas aset pajak tangguhan hingga                      becomes probable that sufficient taxable profit
     kemungkinan besar laba kena pajak yang                           will be available.
     tersedia jumlahnya memadai.

     Grup melakukan saling hapus aset pajak                           The Group offsets deferred tax assets and
     tangguhan dan liabilitas pajak tangguhan jika                    deferred tax liabilities if, and only if:
     dan hanya jika:
     a) Grup memiliki hak yang dapat dipaksakan                       a) The Group has a legally enforceable right
         secara hukum untuk melakukan saling                             to set off current tax assets against current
         hapus aset pajak kini terhadap liabilitas                       tax liabilities; and
         pajak kini; dan
     b) Aset pajak tangguhan dan liabilitas pajak                     b) The deferred tax assets and the deferred
         tangguhan       terkait     dengan   pajak                      tax liabilities relate to income taxes levied
         penghasilan yang dikenakan oleh otoritas                        by the same taxation authority on either:
         perpajakan yang sama atas:
         i. Entitas kena pajak yang sama; atau                             i.   The same taxable entity; or
         ii. Entitas kena pajak yang berbeda yang                         ii.   Different taxable entities which intend
             bermaksud untuk memulihkan aset                                    either to settle current tax liabilities and
             dan liabilitas pajak kini dengan dasar                             assets on a net basis, or to realize the
             neto, atau merealisasikan aset dan                                 assets and settle the liabilities
             menyelesaikan        liabilitas secara                             simultaneously, in each future period in
             bersamaan,       pada setiap periode                               which significant amounts of deferred
             masa depan dimana jumlah signifikan                                tax liabilities or assets are expected to
             atas aset atau liabilitas pajak                                    be settled or recovered.
             tangguhan        diperkirakan    untuk
             diselesaikan atau dipulihkan.

      Grup melakukan saling hapus atas aset pajak                     The Group offsets current tax assets and
      kini dan liabilitas pajak kini jika dan hanya jika,             current tax liabilities if, and only if, the Group:
      Grup:
      a) Memiliki hak yang dapat dipaksakan                           a) Has legally enforceable right to set off the
           secara hukum untuk melakukan saling                           recognized amounts, and
           hapus atas jumlah yang diakui; dan
      b) Bermaksud untuk menyelesaikan dengan                         b) Intends either to settle on a net basis, or to
           dasar neto atau merealisasikan aset dan                       realize the assets and settle liabilities
           menyelesaikan          liabilitas     secara                  simultaneously.
           bersamaan.

2.w. Pajak Penghasilan Final                                     2.w. Final Income Tax
     Sehubungan dengan ditetapkannya Peraturan                        Due to the enactment of Government
     Pemerintah RI No. 9 Tahun 2022 yang                              Regulation Republic of Indonesia No. 9 Year
     diundangkan pada tanggal 21 Februari 2022                        2022, which was enacted on February 21, 2022
     yang merupakan perubahan (revisi) atas                           which is the change (revision) of Government
     Peraturan Pemerintah RI No. 51 Tahun 2008                        Regulation RI No. 51 Year 2008, which was
     yang telah diundangkan tanggal 23 Juli 2008                      passed July 23, 2008 on Tax on Income From
     tentang Pajak atas Penghasilan Dari Usaha                        Construction Services as a substitute
     Jasa Konstruksi sebagai pengganti Peraturan                      Government Regulation RI No. 140 Year 2000,
     Pemerintah RI No. 140 Tahun 2000,                                the Company as the contractor in accordance
     Perusahaan sebagai pelaksana konstruksi                          with Article 3 of Government Regulation No. 9
     sesuai Pasal 3 Peraturan Pemerintah No. 9                        Year 2022 is charged at 2.65% final tax for
     tahun 2022 dikenakan tarif pajak final sebesar                   contract payments or parts of contract which
     2,65% untuk pembayaran kontrak atau bagian                       received after this regulation becomes effective.
     dari kontrak yang terhitung sejak peraturan
     pemerintah ini berlaku.



                                                            53

Page 63
PT WIJAYA KARYA (PERSERO) Tbk                                                PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                          AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                       NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                   FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                       For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                              And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                             Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                           (In Thousand Rupiah, unless Otherwise Stated)
     Pemerintah menurunkan pajak penghasilan                        The Government lowered the income tax (PPh)
     (PPh) final atas penjualan tanah dan                           final over the sale of land and buildings other
     bangunan non subsidi dari 5% menjadi 2,5%                      non subsidy from 5% became 2.5% effective on
     berlaku efektif per tanggal 7 September 2016                   September 7, 2016 or 30 days from the
     atau 30 hari sejak diundangkan Peraturan                       enactment of Government Regulation (PP) No.
     Pemerintah (PP) No. 34 Tahun 2016 tentang                      34 Year 2016 about Income Taxes on the
     Pajak Penghasilan Atas Penghasilan dari                        Income from the Transfer of Land Rights and/or
     Pengalihan Hak Atas Tanah dan/ atau                            Building, and an Increase in the Sale of Land
     bangunan, dan Perjanjian Peningkatan Jual                      and/ or Buildings Along with the Revised
     Beli Atas Tanah dan/ atau Bangunan Beserta                     Document.
     Perubahannya.

2.x. Imbalan Kerja                                              2.x. Employee Benefits
     Imbalan Kerja Jangka Pendek                                     Short-Term Employee Benefits
     Imbalan kerja jangka pendek diakui ketika                       Short-term employee benefits are recognized
     pekerja telah memberikan jasanya dalam                          when an employee has rendered service during
     suatu periode akuntansi, sebesar jumlah tidak                   accounting period, at the undiscounted
     terdiskonto dari imbalan kerja jangka pendek                    amount of short-term employee benefits
     yang diharapkan akan dibayar sebagai                            expected to be paid in exchange for that
     imbalan atas jasa tersebut.                                     service.

     Imbalan kerja jangka pendek mencakup antara                    Short-term employee benefits include such as
     lain upah, gaji, bonus dan insentif.                           wages, salaries, bonus and incentive.

     Imbalan Pascakerja                                             Post-Employment Benefits
     Grup memberikan imbalan pascakerja imbalan                     The Group also provides post-employment
     pasti untuk karyawan sesuai dengan Undang                      benefits as required under Omnibus Law
     Undang Cipta Kerja No. 06/2023.                                No. 06/2023.

     Grup mengakui jumlah liabilitas imbalan pasti                  The Group recognizes the amount of the net
     neto sebesar nilai kini kewajiban imbalan pasti                defined benefit liability at the present value of
     pada akhir periode pelaporan dikurangi nilai                   the defined benefit obligation at the end of the
     wajar aset program yang dihitung oleh aktuaris                 reporting period less fair value of plan assets
     independen dengan menggunakan metode                           which calculated by independent actuaries
     Projected Unit Credit. Nilai kini kewajiban                    using the Projected Unit Credit method. Present
     imbalan      pasti       ditentukan    dengan                  value benefit obligation determined by
     mendiskontokan imbalan tersebut.                               discounting the benefit.

     Grup mencatat tidak hanya kewajiban hukum                      The Group not only record for its legal
     berdasarkan persyaratan formal program                         obligation under the formal terms of a defined
     imbalan pasti, tetapi juga kewajiban konstruktif               benefit plan, but also for any constructive
     yang timbul dari praktik informal entitas.                     obligation that arises from the entity’s informal
                                                                    practices.

     Biaya jasa kini, biaya jasa lalu dan keuntungan                Current service cost, past service cost and gain
     atau kerugian atas penyelesaian, serta bunga                   or loss on settlement, and net interets on the
     neto atas liabilitas (aset) imbalan pasti neto                 net defined benefit liability (asset) are
     diakui dalam laba rugi.                                        recognized in profit or loss.

     Pengukuran kembali atas liabilitas (aset)                      The remeasurement of the net defined benefit
     imbalan pasti neto yang terdiri dari keuntungan                liabilities (assets) comprises actuarial gains and
     dan kerugian aktuarial, imbalan hasil atas aset                losses, the return on plan assets and any
     program dan setiap perubahan dampak atas                       change in effect of the asset are recognized in
     aset diakui sebagai penghasilan komprehensif                   other comprehensive income.
     lain.


                                                           54

Page 64
PT WIJAYA KARYA (PERSERO) Tbk                                                PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                          AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                       NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                   FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                        For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                 June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                               And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                              Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                            (In Thousand Rupiah, unless Otherwise Stated)
     Pesangon                                                        Termination Benefits
     Grup mengakui pesangon sebagai liabilitas                      The Group recognizes liability and expense for
     dan beban pada tanggal yang lebih awal di                      termination benefits at the earlier of the
     antara:                                                        following dates:
     a) Ketika Grup tidak dapat lagi menarik                        a) When the Group no longer can withdraw
         tawaran atas imbalan tersebut; dan                              the offer of those benefits; and
     b) Ketika Grup mengakui biaya untuk                            b) When the Group recognizes costs for a
         restrukturisasi yang berada dalam ruang                         restructuring within the scope of PSAK 237
         lingkup PSAK 237 dan melibatkan                                 and involves payment of termination
         pembayaran pesangon.                                            benefits.

     Grup mengukur pesangon pada saat                               The Group measures termination benefits on
     pengakuan awal, dan mengukur dan mengakui                      initial recognition,    and   measures    and
     perubahan selanjutnya, sesuai dengan sifat                     recognizes subsequent changes, in accordance
     imbalan kerja.                                                 with the nature of the employee benefits.

     Imbalan Kerja Jangka Panjang Lainnya                           Other Long-Term Employee Benefits
     Imbalan jangka panjang lain seperti cuti                       Other long-term benefits such as long service
     berimbalan jangka panjang diukur dengan                        leave measured using the same method as
     menggunakan metode yang sama dengan                            post-employment benefits, except for the
     imbalan pascakerja, kecuali untuk pengukuran                   remeasurement of the liability recognized in
     kembali liabilitas diakui dalam laba rugi.                     profit or loss.

2.y. Investasi pada Entitas Asosiasi dan                        2.y. Investments in Associates and Joint
     Pengaturan Bersama                                              Arrangement
     Entitas Asosiasi                                                Associates
     Entitas asosiasi adalah entitas dimana Grup                     Associates are entities in which the Group has
     memiliki kekuasaan untuk berpartisipasi dalam                   the power to participate in the financial and
     keputusan      kebijakan    keuangan         dan                operating policy decisions of the investee but
     operasional      investee,     tetapi      tidak                has no control or jointly control over those
     mengendalikan atau mengendalikan bersama                        policies (significant influence).
     atas kebijakan tersebut (pengaruh signifikan).

     Investasi pada entitas asosiasi dicatat dengan                 Investment in associates is accounted for using
     menggunakan metode ekuitas. Dalam metode                       the equity method. Under the equity method,
     ekuitas, pengakuan awal investasi diakui                       the investment in an associate is initially
     sebesar biaya perolehan dan jumlah tercatat                    recognized at cost and the carrying amount is
     ditambah atau dikurang bagian atas laba rugi                   added or subtracted by the investor’s share of
     investee setelah tanggal perolehan. Bagian                     the profit or loss of the investee after the date
     atas laba rugi investee diakui dalam laba rugi.                of acquisition. The investor’s share of the profit
     Penerimaan distribusi dari investee akan                       or loss of the investee is recognized in profit or
     mengurangi       nilai   tercatat     investasi.               loss. Distributions received from an investee
     Penyesuaian terhadap jumlah tercatat tersebut                  will reduce the carrying amount of the
     juga mungkin dibutuhkan untuk perubahan                        investment. Adjustments to the carrying
     dalam proporsi bagian investor atas investee                   amount may also be necessary for changes in
     yang timbul dari penghasilan komprehensif                      the investor’s proportionate interest in the
     lain, termasuk perubahan yang timbul dari                      investee arising from changes in the investee’s
     revaluasi aset tetap dan selisih penjabaran                    other comprehensive income, including those
     valuta asing. Bagian investor atas perubahan                   arising from the revaluation of property, plant
     tersebut     diakui     dalam      penghasilan                 and equipment and from foreign exchange
     komprehensif lain.                                             translation differences. The investor’s share of
                                                                    those changes is recognized in other
                                                                    comprehensive income.

     Grup menghentikan penggunaan metode                            The Group discontinues the use of the equity
     ekuitas sejak tanggal ketika investasinya                      method from the date when its investment

                                                           55

Page 65
PT WIJAYA KARYA (PERSERO) Tbk                                             PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                       AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                    NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                     For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                              June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                            And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                           Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                         (In Thousand Rupiah, unless Otherwise Stated)
     berhenti menjadi investasi pada entitas                    ceases to be an associate as follows:
     asosiasi sebagai berikut:
     i.  Jika investasi menjadi entitas anak, Grup              i.     If the investment becomes a subsidiary,
          mencatat investasinya sesuai dengan                          the Group account for its investment in
          PSAK 103 dan PSAK 110;                                       accordance with PSAK 103 and PSAK
                                                                       110;
     ii.    Jika sisa kepentingan dalam entitas                 ii.    If the retained interest in the former
            asosiasi merupakan aset keuangan,                          associate is a financial asset, the Group
            maka Grup mengukur sisa kepentingan                        measures the retained interest at fair
            tersebut pada nilai wajar; dan                             value; and
     iii.   Ketika Grup menghentikan penggunaan                 iii.   When the Group discontinues the use of
            metode ekuitas, Grup mencatat seluruh                      the equity method, the Group accounts for
            jumlah yang sebelumnya telah diakui                        all amounts previously recognized in other
            dalam penghasilan komprehensif lain                        comprehensive income in relation to that
            yang terkait dengan investasi tersebut                     investment on the same basis as would
            menggunakan dasar perlakuan yang                           had been required if the investee had
            sama dengan yang disyaratkan jika                          directly disposed of the related assets or
            investee telah melepaskan secara                           liabilities.
            langsung aset dan liabilitas terkait.

     Jika bagian Grup atas rugi entitas asosiasi                If the Group’s share of losses of an associate
     atau ventura bersama sama dengan atau                      or a joint venture equals or exceeds its carrying
     melebihi kepentingannya pada entitas asosiasi              value in the associate or joint venture, the
     atau     ventura    bersama,     maka     Grup             Group discontinues recognizing its share of
     menghentikan pengakuan bagiannya atas rugi                 further losses. The interest in an associate or a
     lebih lanjut. Kepentingan pada entitas asosiasi            joint venture is the carrying amount of the
     atau ventura bersama adalah jumlah tercatat                investment in the associate or joint venture
     investasi pada entitas asosiasi atau ventura               determined using the equity method together
     bersama        yang     ditentukan      dengan             with any long-term interests that, in substance,
     menggunakan metode ekuitas ditambah                        form part of the Group’s net investment in the
     dengan setiap kepentingan jangka panjang                   associate or joint venture.
     yang secara substansi membentuk bagian
     investasi neto Grup pada entitas asosiasi atau
     ventura bersama.

     Kerugian yang diakui dengan menggunakan                    Losses recognized using the equity method in
     metode ekuitas atas selisih lebih investasi                excess of the Group’s investment in ordinary
     Grup pada saham biasa diterapkan untuk                     shares are applied to the other components of
     komponen lain dari bagian Grup pada entitas                the Group’s interest in an associate or a joint
     asosiasi atau ventura bersama dalam urutan                 venture in the reverse order of their seniority
     terbalik dengan tingkat senioritasnya (yaitu               (i.e priority in liquidation).
     prioritas dalam likuidasi).

     Setelah kepentingan Grup dikurangkan                       After the Group’s carrying value is reduced to
     menjadi nol, tambahan kerugian dicadangkan,                zero, additional losses are provided for, and a
     dan liabilitas diakui, hanya sepanjang Grup                liability is recognized, only to the extent that the
     memiliki kewajiban konstruktif atau hukum                  Group has incurred legal or constructive
     atau melakukan pembayaran atas nama                        obligations or made payments on behalf of the
     entitas asosiasi atau ventura bersama. Jika                associate or joint venture. If the associate or
     entitas asosiasi atau ventura bersama                      joint venture subsequently reports profits, the
     kemudian melaporkan laba, maka Grup mulai                  Group resumes recognizing its share of those
     mengakui bagiannya atas laba tersebut hanya                profits only after its share of the profits equals
     setelah bagiannya atas laba tersebut sama                  the share of losses not recognized.
     dengan bagian atas rugi yang belum diakui.



                                                           56

Page 66
PT WIJAYA KARYA (PERSERO) Tbk                                                PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                          AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                       NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                   FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                       For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                              And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                             Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                           (In Thousand Rupiah, unless Otherwise Stated)
     Grup mengakui kelebihan rugi tersebut                          The Group recognizes the excess as a
     sebagai pengurang kepentingan jangka                           deduction of long-term interest in the associate
     panjang pada entitas asosiasi tersebut.                        entity.

     Pengaturan Bersama                                             Joint Arrangement
     Pengaturan bersama adalah pengaturan atas                      Joint arrangement is an arrangement of which
     dua atau lebih pihak yang memiliki                             two or more parties have joint control, i.e. the
     pengendalian bersama, yaitu persetujuan                        contractually agreed sharing of control of an
     kontraktual untuk berbagi pengendalian atas                    arrangement, which exist only when decisions
     suatu pengaturan, yang hanya ada ketika                        about the relevant activities require the
     keputusan      mengenai     aktivitas relevan                  unanimous consent of the parties sharing
     mensyaratkan persetujuan dengan suara bulat                    control.
     dari seluruh pihak yang berbagi pengendalian.

     Grup mengklasifikasikan pengaturan bersama                     The Group classifies joint arrangement as:
     sebagai:
     1) Operasi Bersama                                             1) Joint Operation
        Merupakan pengaturan bersama yang                              Represents joint arrangement whereby
        mengatur bahwa para pihak yang memiliki                        the parties that have joint control of
        pengendalian bersama atas pengaturan                           the arrangement have rights to the assets,
        memiliki hak atas aset dan kewajiban                           and obligations for the liabilities, relating to
        terhadap     liabilitas, terkait dengan                        the arrangement. Those parties are called
        pengaturan tersebut. Para pihak tersebut                       joint operator.
        disebut operator bersama.

        Operator bersama mengakui hal berikut                         A joint operator recognizes in relation to its
        terkait dengan kepentingannya dalam                           interest in a joint operation:
        operasi bersama:
        (a) Aset, mencakup bagiannya atas setiap                      (a) Its assets, including its share of any
            aset yang dimiliki bersama;                                   assets held jointly;
        (b) Liabilitas, mencakup bagiannya atas                       (b) Its liabilities, including its share of any
            liabilitas yang terjadi bersama;                              liabilities incurred jointly;
        (c) Pendapatan dari penjualan bagiannya                       (c) Its revenue from the sale of its share of
            atas output yang dihasilkan dari operasi                      the output arising from the joint operation;
            bersama;
        (d) Bagian atas pendapatan dari penjualan                     (d) Its share of the revenue from the sale of
            output oleh operasi bersama; dan                              the output by the joint operation; and
        (e) Beban, mencakup bagiannya atas                            (e) Its expenses, including its share of any
            setiap beban yang terjadi secara                              expenses incurred jointly.
            bersama-sama.

     2) Ventura Bersama                                             2) Joint Venture
        Grup     mengklasifikasikan    pengaturan                      The Group classifies joint arrangement as a
        bersama sebagai ventura bersama yang                           joint venture whereby the parties that have
        mengatur bahwa para pihak yang memiliki                        joint control of the arrangement have rights
        pengendalian bersama atas pengaturan                           to the net assets of the arrangement.
        memiliki hak atas aset neto pengaturan                         Those parties are called joint venturers.
        tersebut. Para pihak tersebut disebut                          A joint venturer recognizes its interest in a
        sebagai   venturer    bersama.    Ventura                      joint venture as an investment and accounts
        bersama mengakui kepentingannya dalam                          for that investment using the equity method.
        ventura bersama sebagai investasi dan
        mencatat    investasi   tersebut  dengan
        menggunakan metode ekuitas.

2.z. Biaya Emisi Obligasi dan Saham                             2.z. Bond and Shares
     Biaya emisi obligasi merupakan biaya                            Bond issuance costs are transaction costs to
     transaksi yang harus dikurangkan langsung                       be deducted from the proceeds in order to
                                                           57

Page 67
PT WIJAYA KARYA (PERSERO) Tbk                                                  PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                            AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                         NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                     FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                         For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                  June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                                And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                               Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                             (In Thousand Rupiah, unless Otherwise Stated)
      dari hasil emisi dalam rangka menentukan                       determine the net proceeds of bonds. The
      hasil emisi bersih obligasi. Selisih antara hasil              difference between the net proceeds and the
      emisi bersih dengan nilai nominal merupakan                    nominal value is a discount or premium and will
      diskonto atau premium dan diamortisasi                         be amortized over the term of the bonds.
      selama     jangka    waktu      obligasi    yang
      bersangkutan.
      Biaya emisi saham disajikan sebagai                            Share issuance costs are presented as a
      pengurang dari tambahan modal disetor dan                      deduction of additional paid-in capital and not
      tidak diamortisasi.                                            amortized.

2.aa. Laba per Saham                                            2.aa.Earnings per Share
      Laba per saham dasar dihitung dengan                           Basic earnings per share is computed by
      membagi laba atau rugi yang dapat                              dividing the profit or loss attributable to ordinary
      diatribusikan kepada pemegang saham biasa                      equity holders of the parent entity by the
      entitas induk dengan jumlah rata-rata                          weighted average number of ordinary shares
      tertimbang saham biasa yang beredar dalam                      outstanding during the period.
      suatu periode.

      Untuk tujuan penghitungan laba per saham                       For the purpose of calculation diluted earnings
      dilusian, Grup menyesuaikan laba atau rugi                     per share, the Group shall adjust profit or loss
      yang dapat diatribusikan kepada pemegang                       attributable to ordinary equity holders of the
      saham biasa entitas induk dan jumlah rata-                     parent entity, and the weighted average
      rata tertimbang saham yang beredar, atas                       number of shares outstanding, for the effect of
      dampak dari seluruh instrumen berpotensi                       all dilutive potential ordinary shares.
      saham biasa yang bersifat dilutif.

3. Sumber    Ketidakpastian  Estimasi              dan                 3. Sources of Estimation Uncertainty and
   Pertimbangan Akuntansi yang Penting                                          Critical Accounting Judgments
Dalam penerapan kebijakan akuntansi Grup, Direksi               In the application of the Group accounting policies,
diwajibkan untuk membuat pertimbangan, estimasi                 the Directors are required to make judgments,
dan asumsi tentang jumlah tercatat aset dan                     estimates and assumptions about the carrying
liabilitas yang tidak tersedia dari sumber lain.                amounts of assets and liabilities that are not readily
                                                                apparent from other sources.

Estimasi dan asumsi yang terkait didasarkan pada                The estimates and associated assumptions are
pengalaman historis dan faktor-faktor lain yang                 based on historical experience and other factors that
dianggap relevan. Hasil aktualnya mungkin berbeda               are considered to be relevant. Actual results may
dari estimasi tersebut.                                         differ from these estimates.

Estimasi dan asumsi yang mendasari ditelaah                     The estimates and underlying assumptions are
secara berkelanjutan. Revisi estimasi akuntansi                 reviewed on an ongoing basis. Revisions to
diakui dalam periode dimana estimasi tersebut                   accounting estimates are recognized in the period
direvisi jika revisi hanya mempengaruhi periode                 which the estimate is revised if the revision affects
tersebut, atau pada periode revisi dan periode masa             only that period, or in the period of the revision and
depan jika revisi mempengaruhi periode saat ini dan             future periods if the revision affects both current and
masa depan.                                                     future periods.

Pertimbangan Kritis dalam Penerapan Kebijakan                   Critical Judgments in Applying Accounting
Akuntansi                                                       Policies
Di bawah ini adalah pertimbangan kritis, selain dari            Below are the critical judgments, apart from those
estimasi yang telah diatur, di mana Direksi telah               involving estimates, that the Directors have made in
membuat suatu proses penerapan kebijakan                        the process of applying the Group accounting
akuntansi Grup dan memiliki pengaruh paling                     policies and that have the most significant effect on
signifikan terhadap jumlah yang diakui dalam                    the amounts recognized in the consolidated financial
laporan keuangan konsolidasian.                                 statements.

                                                           58

Page 68
PT WIJAYA KARYA (PERSERO) Tbk                                                 PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                           AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                    FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                        For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                 June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                               And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                              Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                            (In Thousand Rupiah, unless Otherwise Stated)
Kepentingan dalam Pengaturan Bersama                            Interests in Joint Arrangements
Pertimbangan diperlukan untuk menentukan ketika                 Judgement is required to determine when the Group
Grup memiliki pengendalian bersama, yang                        has joint control, which requires an assessment of
membutuhkan penilaian mengenai aktivitas yang                   the relevant activities and when the decisions in
relevan dan ketika keputusan yang berkaitan                     relation to those activities require unanimous
dengan      aktivitas  tersebut    membutuhkan                  consent. The Group has determined that the
persetujuan dengan suara bulat. Grup menentukan                 relevant activities for its joint arrangements are
bahwa aktivitas yang relevan untuk pengaturan                   those relating to the financial, operating and capital
bersama adalah aktivitas yang berkaitan dengan                  decisions of the arrangement.
keputusan keuangan, operasional dan modal dari
pengaturan tersebut.

Pertimbangan        juga        diperlukan    untuk             Judgement is also required to classify a joint
mengklasifikasikan pengaturan bersama sebagai                   arrangement as either a joint operation or a joint
pengendalian bersama atau ventura bersama.                      venture. Classifying the arrangement requires the
Pengklasifikasian         pengaturan       tersebut             Group to assess its rights and obligations arising
mengharuskan Grup untuk menilai hak dan                         from the arrangement. Specifically, it considers:
kewajiban yang timbul dari pengaturan tersebut.
Secara khusus, Grup mempertimbangkan:
• Struktur dari pengaturan bersama, apakah                      •   The structure of the joint arrangement - whether
    dibentuk melalui kendaraan terpisah                             it is structured through a separate vehicle
• Ketika pengaturan tersebut terstruktur melalui                •   When the arrangement is structured through a
    kendaraan         terpisah,       Grup      juga                separate vehicle, the Group also considers the
    mempertimbangkan hak dan kewajiban yang                         rights and obligations arising from:
    timbul dari:
    a. Bentuk legal dari kendaraan terpisah;                        a. The legal form of the separate vehicle;
    b. Persyaratan dari perjanjian kontraktual; dan                 b. The terms of the contractual arrangement;
                                                                       and
    c.   Fakta dan kondisi lainnya, jika relevan.                   c. Other relevant facts and circumstances.

Penilaian ini sering membutuhkan pertimbangan                   This assessment often requires significant
yang signifikan. Kesimpulan yang berbeda                        judgement. A different conclusion on joint control
mengenai pengendalian bersama dan apakah suatu                  and also whether the arrangement is a joint
pengaturan adalah sebuah operasi bersama atau                   operation or a joint venture, may have a material
ventura bersama, dapat memiliki dampak material                 impact on the consolidated financial statements.
terhadap laporan keuangan konsolidasian.

Grup memiliki pengaturan bersama yang terstruktur               The Group has joint arrangements which are
melalui ventura bersama. Struktur dan persyaratan               structured through joint ventures. These structures
dari perjanjian kontraktual mengindikasikan bahwa               and the terms of the contractual arrangement
Grup memiliki hak atas aset bersih dari pengaturan              indicate that the Group has rights to the net assets
bersama tersebut. Grup menilai fakta dan kondisi                of the arrangement. The Group also assessed the
lain yang berkaitan dengan pengaturan ini dan                   other facts and circumstances relating to these
menyimpulkan      bahwa      pengaturan    tersebut             arrangements and concluded that the arrangements
merupakan sebuah ventura bersama.                               are joint ventures.

Investasi pada Entitas Asosiasi                                 Investments in Associates
PT Wijaya Karunia Realtindo (WKR) merupakan                     PT Wijaya Karunia Realtindo (WKR) is an associate
entitas asosiasi dari WIKA Realty. Meskipun WIKA                entity of WIKA Realty. Although WIKA Realty has
Realty memiliki 50% kepemilikan di WKR, WIKA                    50% ownership in WKR, WIKA Realty assesses
Realty menilai apakah WIKA Realty memiliki                      whether WIKA Realty has control over WKR by
pengendalian         atas       WKR       dengan                considering the presence of WIKA Realty
mempertimbangkan keberadaan perwakilan WIKA                     representatives on the WKR Board of Directors who
Realty di Dewan Direksi WKR yang memiliki                       have the power to direct and WKR’s activities
kekuatan untuk mengarahkan kegiatan WKR secara                  unilaterally and concludes WIKA Realty has no
sepihak dan berkesimpulan WIKA Realty tidak                     control but only has a significant influence on WKR.
                                                           59

Page 69
PT WIJAYA KARYA (PERSERO) Tbk                                                  PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                            AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                         NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                     FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                         For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                  June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                                And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                               Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                             (In Thousand Rupiah, unless Otherwise Stated)
memiliki kontrol tetapi hanya memiliki pengaruh
signifikan terhadap WKR.

Kombinasi Bisnis – Uji Konsentrasi                              Business Combination – Concentration Test
Pada saat akan mengakuisisi suatu entitas sebagai               When acquiring an entity as a subsidiary, the Group
entitas anak, Grup melakukan pengujian untuk                    performs testing to determine whether the
menentukan apakah transaksi tersebut merupakan                  transaction is a business combination or an asset
transaksi kombinasi bisnis atau akuisisi aset melalui           acquisition through an optional test, namely the
tes opsional yaitu uji konsentrasi.                             concentration test.

Pada tahun 2025, Grup memutuskan untuk                          In 2025, the Group decided to use the asset
menggunakan        uji konsentrasi   aset dalam                 concentration test in determining whether the
penentuan apakah akuisisi tersebut merupakan                    acquisition is an asset acquisition or a business
akuisisi aset atau kombinasi bisnis.                            combination.

Uji konsentrasi terpenuhi jika secara substansial               The concentration test is met if substantially all of
seluruh nilai wajar aset bruto yang diperoleh                   the fair value of the gross assets acquired is
terkonsentrasi pada suatu aset atau kelompok aset               concentrated in a single identifiable asset or a group
sejenis yang dapat diidentifikasi. Pada saat                    of similar identifiable assets. For the concentration
dilakukan uji konsentrasi:                                      test:
 a) Aset bruto yang diperoleh tidak termasuk kas dan             a) Gross assets acquired shall exclude cash and
    setara kas, aset pajak tangguhan, dan goodwill                  cash equivalents, deferred tax assets, and
    yang dihasilkan dari pengaruh kewajiban pajak                   goodwill resulting from the effects of deferred tax
    tangguhan;                                                      liabilities;
 b) Nilai wajar aset bruto yang diperoleh harus                  b) The fair value of the gross assets acquired shall
    mencakup imbalan yang dialihkan (ditambah nilai                 include any consideration transferred (plus the
    wajar pihak nonpengendali dan nilai wajar dari                  fair value of any non-controlling interest and the
    setiap kepentingan yang dimiliki sebelumnya)                    fair value of any previously held interest) in
    lebih dari nilai wajar aset teridentifikasi bersih              excess of the fair value of net identifiable assets
    yang diperoleh. Nilai wajar dari aset bruto yang                acquired. The fair value of the gross assets
    diperoleh biasanya dapat ditentukan sebagai total               acquired may normally be determined as the total
    perolehan dengan menambahkan nilai wajar                        obtained by adding the fair value of the
    imbalan yang dialihkan (ditambah nilai wajar                    consideration transferred (plus the fair value of
    setiap kepentingan non-pengendali dan nilai wajar               any non-controlling interest and the fair value of
    setiap kepentingan yang dimiliki sebelumnya)                    any previously held interest) to the fair value of
    dengan nilai wajar liabilitas yang ditanggung                   the liabilities assumed (other than deferred tax
    (selain kewajiban pajak tangguhan), kemudian                    liabilities), and then excluding the items identified
    mengecualikan pos-pos aset yang teridentifikasi                 in subparagraph (a).
    dalam sub-ayat (a).
    Namun, jika nilai wajar bruto aset yang diperoleh              However, if the fair value of the gross assets
    lebih dari jumlah tersebut, perhitungan yang lebih             acquired is more than that total, a more precise
    tepat akan dibutuhkan;                                         calculation may sometimes be needed.
 c) Satu aset teridentifikasi mencakup setiap aset              c) A single identifiable asset shall include any asset
    atau kelompok aset yang akan diakui dan diukur                 or group of assets that would be recognised and
    sebagai satu aset teridentifikasi dalam kombinasi              measured as a single identifiable asset in a
    bisnis;                                                        business combination;
 d) Jika aset berwujud melekat dan tidak dapat                  d) If a tangible asset is attached to, and cannot be
    dipindahkan secara fisik serta digunakan secara                physically removed and used separately from,
    terpisah dari aset berwujud lainnya tanpa                      another tangible asset without incurring
    menimbulkan biaya signifikan atau penurunan                    significant cost or significant diminution in utility or
    utilitas atau nilai wajar yang signifikan (misalnya            fair value (for example, land and buildings), those
    tanah dan bangunan), maka aset tersebut                        assets shall be considered a single identifiable
    dianggap sebagai satu aset teridentifikasi tunggal;            asset; and
    dan
 e) Ketika menilai apakah aset serupa, entitas                  e) When assessing whether assets are similar, an
    mempertimbangkan sifat masing-masing aset                      entity shall consider the nature of each single

                                                           60

Page 70
PT WIJAYA KARYA (PERSERO) Tbk                                                 PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                           AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                    FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                        For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                 June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                               And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                              Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                            (In Thousand Rupiah, unless Otherwise Stated)
   teridentifikasi dan risiko yang terkait dalam                   identifiable asset and the risks associated with
   mengelola serta menghasilkan output dari aset                   managing and creating outputs from the assets.
   tersebut.

Sumber Ketidakpastian Estimasi                                  Sources of Estimation Uncertainty
Asumsi utama mengenai masa depan dan sumber                     The key assumptions concerning future and other
utama ketidakpastian estimasi lainnya pada akhir                key sources of estimation uncertainty at the end of
periode pelaporan, yang memiliki risiko signifikan              the reporting period, that have a significant risk of
yang     mengakibatkan     penyesuaian      material            causing a material adjustment to the carrying
terhadap jumlah tercatat aset dan liabilitas dalam              amounts of assets and liabilities within the next
periode pelaporan berikutnya dijelaskan di bawah                financial year are discussed below:
ini:
Pengakuan Pendapatan Konstruksi dan Beban                       Revenue Construction and Cost of Revenue
Pokok Pendapatan                                                Recognition
Grup mengakui pendapatan konstruksi dan beban                   The Group recognizes revenues from construction
pokok pendapatan dari proyek yang masih dalam                   and cost of revenues from the construction and
progress pembangunan berdasarkan metode                         project in development stage based on percentage
persentase penyelesaian. Asumsi yang penting                    of completion method. Important assumption is
diperlukan adalah dalam menentukan tahap                        required in determining the stage completion
penyelesaian (persentase penyelesaian) dan jumlah               (percentage of completion) and the amount of
estimasi    pendapatan      dan     jumlah    biaya             estimated income and total development cost. In
pembangunan. Dalam membuat asumsi, Grup                         making assumptions, the Group evaluates them
mengevaluasinya berdasarkan pengalaman di                       based on past experience and with the assistance of
waktu yang lampau dan bantuan dari spesialis.                   specialists. Total construction revenues and related
Jumlah pendapatan konstruksi dan beban pokok                    cost of revenues are presented in Notes 44 and 45.
pendapatan yang terkait disajikan di Catatan 44 dan
45.

Rugi Penurunan Nilai pada Aset Keuangan yang                    Impairment Loss on Financial Asset measured at
diukur pada Biaya Perolehan yang Diamortisasi                   Amortized Cost
Grup menilai penurunan nilai pada aset keuangan                 The Group assesses its financial assets measured
dengan biaya perolehan yang diamortisasi pada                   at amortized cost for impairment at each reporting
setiap tanggal pelaporan. Dalam menentukan                      date. In determining whether an impairment loss
apakah rugi penurunan nilai harus dicatat dalam                 should be recorded in profit or loss, management
laba rugi, manajemen harus mempertimbangkan                     makes a judgement as to whether there is
informasi yang wajar dan terdukung yang tersedia                reasonable and supportable information that is
tanpa biaya atau upaya berlebihan pada tanggal                  available without undue cost or effort about past
pelaporan mengenai peristiwa masa lalu, kondisi                 events, current conditions and forecasts of future
kini, dan perkiraan kondisi ekonomi masa depan.                 conditions. The Group applies simplified approach
Grup       menerapkan         pendekatan          yang          using roll rate and discounted cash flow to
disederhanakan untuk mengukur kerugian kredit                   measuring account receivable, retention receivable
ekspektasian yang menggunakan roll rate dan                     and gross amount due from customers. The carrying
discounted cash flow untuk menilai piutang usaha,               amounts of financial assets are disclosed in Notes 6,
piutang retensi, dan tagihan bruto. Nilai tercatat aset         7, 8.
keuangan telah diungkapkan dalam Catatan 6, 7, 8.

Penyisihan Penurunan Keusangan Persediaan                       Allowance Impairment for Obsolescence of
                                                                Inventories
Penyisihan penurunan keusangan persediaan                       Allowance for impairment for obsolescence of
diestimasi berdasarkan fakta dan situasi yang                   inventories is estimated based on the best available
tersedia, termasuk namun tidak terbatas kepada,                 facts and circumstances, including but not limited to,
kondisi fisik persediaan yang dimiliki, harga jual              the inventories’ own physical conditions, their market
pasar, estimasi biaya penyelesaian dan estimasi                 selling prices, estimated costs of completion and
biaya yang timbul untuk penjualan. Penyisihan                   estimated costs to be incurred for their sales. The
dievaluasi kembali dan disesuaikan jika terdapat                allowance is reevaluated and adjusted as additional
tambahan informasi yang mempengaruhi jumlah                     information received affects the amount estimated.

                                                           61

Page 71
PT WIJAYA KARYA (PERSERO) Tbk                                                 PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                           AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                    FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                         For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                  June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                                And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                               Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                             (In Thousand Rupiah, unless Otherwise Stated)
yang   diestimasi. Nilai   tercatat        persediaan           The carrying amount of inventories is disclosed in
diungkapkan dalam Catatan 11.                                   Note 11.

Penyisihan Penurunan Pekerjaan Dalam Proses                     Allowance Impairment for Construction Work in
Konstruksi                                                      Progress
Rugi penurunan nilai diakui sebesar nilai tercatat              An impairment loss is recognized for the amount by
aset melebihi jumlah terpulihkannya. Perhitungan                which the carrying amount of the asset exceeds its
manajemen atas estimasi penurunan nilai PDPK                    recoverable amount. The calculation of the
melibatkan estimasi dan pertimbangan yang                       management on the estimated impairment of CWIP
signifikan. Grup membandingkan jumlah terpulihkan               involves significant estimates and judgments. The
dengan nilai tercatat untuk mengukur penurunan                  Group compares the recoverable amount with the
nilai PDPK. Grup menelaah estimasi penurunan                    carrying amount to measure the impairment of
nilai PDPK berdasarkan kondisi masing-masing                    CWIP. The Group reviews the estimated impairment
proyek dengan mempertimbangkan data historis,                   of CWIP based on the conditions of each project by
asumsi atau ekspektasi kondisi masa depan.                      considering historical data, assumptions or
                                                                expectations of future conditions.

Taksiran Masa Manfaat Ekonomis Aset Tetap                       Estimated Useful Lives of Fixed Assets
Masa manfaat setiap aset tetap Grup ditentukan                  The useful life of each of the Group's fixed assets is
berdasarkan kegunaan yang diharapkan dari aset                  determined based on the expected use of the
tersebut. Estimasi ini ditentukan berdasarkan                   assets. Such estimation is based on internal
evaluasi teknis internal dan pengalaman atas aset               technical evaluation and experience with similar
sejenis. Masa manfaat setiap aset direviu secara                assets. The estimated useful life of each asset is
periodik dan disesuaikan apabila prakiraan berbeda              reviewed periodically and updated if expectations
dengan estimasi sebelumnya karena keausan,                      differ from previous estimates due to physical wear
keusangan teknis dan komersial, hukum atau                      and tear, technical or commercial obsolescence and
keterbatasan lainnya atas pemakaian aset. Namun                 legal or other limits on the use of the asset. It is
terdapat kemungkinan bahwa hasil operasi dimasa                 possible, however, that future results of operations
mendatang dapat dipengaruhi secara signifikan oleh              could be materially affected by changes
perubahan atas jumlah serta periode pencatatan                  in the amounts and timing of recorded expenses
biaya yang diakibatkan karena perubahan faktor                  brought about by changes in the factors mentioned
yang disebutkan di atas.                                        above.

Perubahan masa manfaat aset tetap dapat                         A change in the estimated useful life of any item of
mempengaruhi jumlah biaya penyusutan yang                       property, plant and equipment would affect the
diakui dan penurunan nilai tercatat aset tersebut.              recorded depreciation expense and decrease in the
Nilai tercatat aset tetap diungkapkan dalam Catatan             carrying amounts of these assets. The carrying
20.                                                             amounts of fixed assets are disclosed in Note 20.

Pengukuran Nilai Wajar untuk Properti Investasi                 Fair Value Measurements of Investment Properties
Properti investasi Grup diukur pada nilai wajar untuk           The Group’s investment property was measured at
tujuan pelaporan keuangan. Dalam mengestimasi                   fair value for financial reporting purposes.
nilai wajar, Grup menugaskan penilai independen                 In estimating the fair value, the Group engaged
untuk melakukan penilaian. Penilaian tersebut                   independent valuers to perform the valuation. Such
didasarkan pada pendekatan pendapatan, biaya,                   valuation was based on income, cost, and market
dan data pasar. Nilai tercatat properti investasi               data approaches. The carrying amount of the
diungkapkan dalam Catatan 19.                                   investment properties are disclosed in Note 19.

Imbalan Kerja                                                   Employee Benefits
Penentuan liabilitas imbalan pascakerja tergantung              The determination of employee benefits obligation is
pada pemilihan asumsi tertentu yang digunakan                   dependent on selection of certain assumptions used
oleh aktuaris dalam menghitung jumlah liabilitas                by actuaries in calculating such amounts. Those
tersebut. Asumsi tersebut termasuk antara lain                  assumptions include among others, discount rate
tingkat diskonto dan tingkat kenaikan gaji. Realisasi           and rate of salary increase. Actual results that differ
aktual yang berbeda dari asumsi Grup akibatnya                  from    the    Group’s     assumptions       generally
akan berpengaruh terhadap jumlah biaya yang                     affect the recognized expense in profit or

                                                           62

Page 72
PT WIJAYA KARYA (PERSERO) Tbk                                                 PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                           AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                    FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                        For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                 June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                               And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                              Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                            (In Thousand Rupiah, unless Otherwise Stated)
diakui      di   laba   rugi    dan      penghasilan            loss and other comprehensive income and
komprehensif       lain   serta   liabilitas   yang             recorded obligation in future periods. While it is
diakui di masa mendatang. Walaupun asumsi                       believed that the Group’s assumptions are
Grup dianggap tepat dan wajar, namun                            reasonable and appropriate, significant differences
perubahan signifikan pada kenyataannya atau                     in actual results or significant changes in
perubahan signifikan dalam asumsi yang digunakan                assumptions may materially affect the Group’s
dapat berpengaruh secara signifikan terhadap                    employee benefit liabilites. The carrying amounts of
liabilitas imbalan pascakerja Grup. Nilai tercatat              employee benefits liabilites are disclosed in Note 34.
liabilitas imbalan pascakerja diungkapkan dalam
Catatan 34.

Penurunan Nilai Goodwill                                        Impairment of Goodwill
Menentukan apakah suatu goodwill mengalami                      Determining whether goodwill is impaired requires
penurunan nilai mengharuskan estimasi nilai pakai               an estimation of the value in use of the cash
unit penghasil kas dimana goodwill dialokasikan.                generating units to which goodwill has been
Perhitungan nilai pakai mengharuskan manajemen                  allocated. The value in use calculation requires the
untuk mengestimasi arus kas masa depan yang                     management to estimate the future cash flows
diharapkan timbul dari unit penghasil kas yang                  expected to arise from the cash-generating unit
menggunakan tingkat pertumbuhan yang tepat dan                  using an appropriate growth rate and a suitable
tingkat diskonto yang sesuai untuk perhitungan nilai            discount rate in order to calculate present value.
kini. Dimana aktual arus kas masa depan kurang                  Where the actual future cash flows are less than
dari yang diharapkan, kerugian penurunan nilai                  expected, a material impairment loss may arise.
material mungkin timbul. Nilai tercatat goodwill pada           The carrying amounts of goodwill at the end of the
akhir periode pelaporan disajikan pada Catatan 22.              reporting period are set out in Note 22.

Provisi Pelapisan Jalan Tol                                     Provision for Toll Road Overlay
Dalam pengoperasian jalan tol, Grup mempunyai                   In operating toll roads, the Group is obliged to
kewajiban untuk menjaga kualitas sesuai dengan                  maintain quality in accordance with the SPM
SPM (Standar Pelayanan Minimum) yang                            (Minimum Service Standards) established by
ditetapkan oleh Kementerian Pekerjaan Umum dan                  Ministry of Public Works and Public Housing of the
Perumahan Rakyat Republik Indonesia, yaitu                      Republic of Indonesia, i.e., by performing toll road
antara lain dengan melakukan pelapisan ulang                    overlay regularly. The cost of this overlay is
jalan tol secara berkala. Biaya pelapisan ini akan              periodically provided based on estimated utilization
dicadangkan secara berkala berdasarkan estimasi                 of toll road by customers. The estimated net
penggunaan jalan tol oleh pelanggan. Provisi                    provision for toll road overlay is discounted to its
pelapisan ulang jalan tol diukur dengan nilai kini              present value that reflects management estimates
atas estimasi manajemen terhadap pengeluaran                    againts cost incurred to settle current provision.
yang diperlukan untuk menyelesaikan liabilitas kini.

4.    Kas dan Setara Kas                                                           4. Cash and Cash Equivalents

                                                                                   2026                    2025
                                                                                    Rp                      Rp
Kas/ Cash on Hand                                                                    27.292.886              30.822.922
Bank - Pihak Berelasi/ Bank - Related Parties
  (Catatan 52/Note 52)                                                            1.475.245.220           2.053.044.129
Bank - Pihak Ketiga/ Bank - Third Parties
Rupiah
  PT Bank CIMB Niaga Tbk                                                               8.513.556              7.263.395
  PT Bank DBS Indonesia                                                                2.818.960             27.569.146
  PT Bank Pembangunan Daerah Jawa Barat dan Banten Tbk                                   870.921             25.066.031
  Lain-lain (masing-masing di bawah Rp5.000.000)/
     Others (each below Rp5,000,000)                                                  6.948.197              12.646.800
  Subtotal                                                                           19.151.634              72.545.372


                                                           63

Page 73
PT WIJAYA KARYA (PERSERO) Tbk                                                 PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                           AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                    FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                        For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                 June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                               And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                              Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                            (In Thousand Rupiah, unless Otherwise Stated)
                                                                                    2026                    2025
                                                                                     Rp                      Rp
Mata Uang Asing/ Foreign Currencies
DINAR
  Bank CPA                                                                            50.051.101               50.175.533
MYR
  RHB Bank Kuching                                                                            44               21.115.392
  Lain-lain (masing-masing di bawah Rp5.000.000)/
     Others (each below Rp5,000,000)                                                   2.842.436                4.802.917
  Subtotal                                                                            52.893.581               76.093.842
Total Bank/ Banks                                                                  1.547.290.435            2.201.683.343

Deposito Berjangka - Pihak Berelasi (Catatan 52)/
  Time Deposits - Related Parties (Note 52)                                          358.620.959              522.451.881
Deposito Berjangka - Pihak Ketiga/
  Time Deposits - Third Parties
  Subtotal                                                                                     --                       --
                                                                                     358.620.959              522.451.881
Total                                                                              1.933.204.280            2.754.958.146

Tingkat Bunga/ Interest Rates                                                   2.00% - 4.50%            2.00% - 4.50%
Jangka Waktu/ Maturity Period                                                1 - 3 Bulan/ Months      1 - 3 Bulan/ Months

Manajemen berkeyakinan semua saldo kas dan                      Management believes all cash and cash equivalents
setara kas dapat digunakan oleh Grup.                           can be used by the Group.

5. Bank Dibatasi Penggunaannya                                                                      5. Restricted Bank
Bank - Pihak Berelasi/ Bank - Related Parties
  (Catatan 52/Note 52)                                                               26.911.428              450.121.356

Bank - Pihak Ketiga/ Bank - Third Parties
Rupiah
  PT Bank Central Asia Tbk                                                            1.061.019                         --

Total Bank Dibatasi Penggunaannya / Restricted Banks                                 27.972.447              450.121.356

Perusahaan                                                      The Company
Bank dibatasi penggunaannya yang ditempatkan di                 A current account held at PT Bank Mandiri (Persero)
PT Bank Mandiri (Persero) Tbk, yang berasal dari                Tbk, originating from state capital participation. This
penyertaan modal negara. Giro dalam bank ini                    current account can only be used to finance National
hanya dapat digunakan untuk mendanai Proyek                     Strategic Projects that are currently being and will be
Strategis Nasional yang sedang dan akan dikerjakan              undertaken by the Company, as stated in the
oleh Perusahaan sesuai yang tercantum dalam                     Prospectus.
Prospektus.

PT Wijaya Karya Rekayasa Konstruksi (”WIKA                      PT Wijaya Karya Rekayasa Konstruksi (”WIKA
RK”)                                                            RK”)
Bank yang dibatasi penggunaannya merupakan kas                  The bank whose use is restricted is cash in a bank
di bank milik WRK yang penggunaan dan penarikan                 owned by WRK, the use and withdrawal of which is
dananya diatur sesuai dengan kesepakatan antara                 regulated in accordance with the agreement between
WRK dan Perbankan.                                              WRK and the Bank.


                                                           64

Page 74
PT WIJAYA KARYA (PERSERO) Tbk                                                    PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                              AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                           NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                       FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                           For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                    June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                                  And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                                 Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                               (In Thousand Rupiah, unless Otherwise Stated)
PT Wijaya Karya Serang Panimbang (”WSP”)                           PT Wijaya Karya Serang Panimbang (”WSP”)
Bank yang dibatasi penggunaannya merupakan                         Banks whose use is restricted are balances withheld
saldo ditahan atas rekening kewajiban kredit                       on investment credit liability accounts, investment
investasi, rekening cadangan kewajiban kredit                      credit liability reserve accounts and toll revenues.
investasi dan pendapatan tol.

PT Wijaya Karya Tirta Jaya Jatiluhur (”WTJJ”)                      PT Wijaya Karya Tirta Jaya Jatiluhur (”WTJJ”)
Sifat akun ini sesuai dengan perjanjian pinjaman                   The nature of this account is in accordance with the
sindikasi yang merupakan Rekening Cadangan                         syndicated loan agreement which is the Company's
Layanan Utang Perusahaan untuk pembayaran                          Debt Service Reserve Account for the payment of
kewajiban pinjaman bulanan.                                        monthly loan obligations.


6. Piutang Usaha                                                                                 6. Trade Receivables
                                                                                        2026                   2025
                                                                                         Rp                     Rp
Pihak Berelasi/Related Parties (Catatan 52/Note 52 )                                     817.689.510            916.517.057
Dikurangi/Less : Cadangan Kerugian Penurunan Nilai/
  Allowance for Impairment Losses                                                       (166.149.461)         (189.214.818)
  Subtotal Pihak Berelasi-Neto/Subtotal Related Parties-Net                              651.540.049            727.302.239
Pihak Ketiga/Third Parties                                                              1.555.753.140         1.427.197.637
Dikurangi/Less :Cadangan Kerugian Penurunan Nilai/
  Allowance for Impairment Losses                                                       (558.606.940)         (595.138.910)
  Subtotal Pihak Ketiga-Neto/Subtotal Third Parties-Net                                  997.146.200            832.058.727

Total                                                                                   1.648.686.249         1.559.360.966


Rincian piutang usaha berdasarkan mata uang                        Details of trade receivables based on currencies are
adalah sebagai berikut:                                            as follows:
                                                                                        2026                   2025
                                                                                         Rp                     Rp
Rupiah                                                                                  2.304.956.158         2.275.228.202
Dinar Al-Jazair/Algeria                                                                    57.645.310            57.645.310
Dolar Amerika Serikat/United States Dollar                                                  6.251.479             6.251.479
New Taiwan Dollar                                                                           4.589.703             4.589.703
Subtotal                                                                                2.373.442.650         2.343.714.694
Dikurangi/Less :Cadangan Kerugian Penurunan Nilai/
  Allowance for Impairment Losses                                                       (724.756.401)         (784.353.728)
Total                                                                                   1.648.686.249         1.559.360.966


Rincian umur piutang usaha adalah sebagai berikut:                 The aging of trade receivables are as follows:
                                                                                        2026                   2025
                                                                                         Rp                     Rp

Belum Jatuh Tempo/Not Yet Due                                                             794.187.152           558.549.288
1-3 Bulan/Months                                                                          249.135.386           470.552.064
3-6 Bulan/Months                                                                           85.396.288            89.069.166
6-12 Bulan/Months                                                                          84.583.670            92.857.772
> 12 Bulan/Months                                                                       1.160.140.154         1.132.686.404
Subtotal                                                                                2.373.442.650         2.343.714.694
Dikurangi/Less : Cadangan Kerugian Penurunan Nilai/
  Allowance for Impairment Losses                                                       (724.756.401)         (784.353.728)
Total                                                                                   1.648.686.249         1.559.360.966


                                                              65

Page 75
PT WIJAYA KARYA (PERSERO) Tbk                                                 PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                           AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                    FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                        For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                 June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                               And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                              Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                            (In Thousand Rupiah, unless Otherwise Stated)
Mutasi cadangan kerugian penurunan nilai adalah             The movements of allowance for impairment losses
sebagai berikut:                                            on trade receivables are as follows:
                                                                                     2026                   2025
                                                                                      Rp                     Rp

Saldo Awal/Beginning Balance                                                           784.353.728           697.233.658
Penambahan/Additional                                                                   44.698.751           282.946.110
Pemulihan/Recovery                                                                   (104.296.078)         (195.826.040)
Saldo Akhir/Ending Balance                                                             724.756.401           784.353.728


Manajemen Grup berkeyakinan bahwa cadangan                      Management of the Group believes that the
kerugian penurunan nilai atas piutang usaha cukup               allowance for impairment losses on trade receivables
untuk menutup kemungkinan kerugian di masa                      is sufficient to cover possible losses on uncollectible
depan dari tidak tertagihnya piutang.                           of receivables in the future.

Sebagian piutang usaha dijaminkan untuk fasilitas               Some accounts receivables had been pledged as
pinjaman jangka pendek dan pinjaman jangka                      collateral for facilities from short-term and long-term
panjang (Catatan 26 dan 37).                                    loans (Notes 26 and 37).

Pada tahun 2025, WIKA Gedung memperoleh 16                      In 2025, WIKA Gedung acquired 16 land parcels
bidang tanah SHM seluas 227.666 m2 di Lombok                    (SHM) with a total area of 227,666 m2 in West
Barat dengan nilai perolehan Rp14.965.087 sebagai               Lombok at an acquisition cost of Rp14,965,087 as
penyelesaian kewajiban PT Indraco kepada WIKA                   settlement of PT Indraco’s obligation to WIKA
Gedung (Catatan 16).                                            Gedung (Note 16).

Pada tahun 2025, saldo piutang usaha WIKA Beton                 In 2025, trade receivables of WIKA Beton from PT
kepada PT Waskita Beton Precast Tbk dikonversi                  Waskita Beton Precast Tbk were converted into
menjadi investasi jangka panjang lainnya sebesar                other   long-term    investments   amounting   to
Rp7.920.860      berdasarkan     Berita    Acara                Rp7,920,860 based on the Minutes of Agreement
Kesepakatan     (Perjanjian   Homologasi)    No.                (Homologation Agreement) No. SE.02.01/WB-
SE.02.01/WB-035/2025 tanggal 25 Juni 2025                       035/2025 dated June 25, 2025 (Note 23).
(Catatan 23).

7. Piutang Retensi                                                                          7. Retention Receivables
                                                                                     2026                   2025
                                                                                      Rp                     Rp
Pihak Berelasi (Catatan 52)/Related Parties (Note 52)                                 399.122.412            295.153.774
Dikurangi/Less : Cadangan Kerugian Penurunan Nilai/
  Allowance for Impairment Losses                                                     (24.465.287)           (30.087.132)
  Subtotal                                                                            374.657.125            265.066.642
Pihak Ketiga/Third Parties                                                            532.638.376            631.102.717
Dikurangi/ Less : Cadangan Kerugian Penurunan Nilai/
  Allowance for Impairment Losses                                                    (145.135.673)         (133.823.130)
  Subtotal                                                                            387.502.703            497.279.587
Total                                                                                 762.159.828            762.346.229




                                                           66

Page 76
PT WIJAYA KARYA (PERSERO) Tbk                                                   PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                             AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                          NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                      FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                        For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                 June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                               And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                              Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                            (In Thousand Rupiah, unless Otherwise Stated)
Rincian piutang retensi berdasarkan mata uang                   Details of retention receivables based on currencies
adalah sebagai berikut:                                         are as follows:
                                                                                      2026                   2025
                                                                                       Rp                     Rp
Rupiah                                                                                 925.757.428            920.253.131
Dolar Amerika Serikat/United States Dollar                                               2.990.934              2.990.934
New Taiwan Dollar                                                                        1.885.163              1.885.163
Ringgit Malaysia                                                                         1.127.263              1.127.263
Subtotal                                                                               931.760.788            926.256.491
Dikurangi/Less : Cadangan Kerugian Penurunan Nilai/
  Allowance for Impairment Losses                                                     (169.600.960)         (163.910.262)
Total                                                                                   762.159.828           762.346.229


Mutasi cadangan kerugian penurunan nilai piutang                The movements of allowance for impairment losses
retensi adalah sebagai berikut:                                 on retention receivable are as follows:
                                                                                      2026                   2025
                                                                                       Rp                     Rp

Saldo Awal/Beginning Balance                                                           163.910.262             168.662.196
Penambahan/Additional                                                                    31.666.236             99.143.928
Penghapusan/ Write Off                                                                            --             (304.752)
Pemulihan/Recovery                                                                     (25.975.538)          (103.591.110)
Saldo Akhir/ Ending Balance                                                            169.600.960             163.910.262


Manajemen Grup berkeyakinan bahwa cadangan                      Management of the Group believes that the
kerugian penurunan nilai atas piutang retensi cukup             allowance for impairment losses on retention
untuk menutup kemungkinan kerugian di masa                      receivables is sufficient to cover possible losses on
depan dari tidak tertagihnya piutang retensi.                   uncollectible of retention receivables in the future.

8. Tagihan Bruto Ke Pemberi Kerja                                         8. Gross Amount Due from Customers

                                              2026                     2025
                                               Rp                       Rp

Biaya Konstruksi                             59.974.239.772          55.519.954.223                     Construction Cost
Laba yang Diakui                              3.552.380.611           3.032.231.361                     Recognized Profit
Subtotal                                     63.526.620.382          58.552.185.584                               Subtotal
Penagihan                                  (60.377.342.194)        (56.846.570.179)                       Progress Billing
Tagihan Bruto Pemberi Kerja                   3.149.278.188           1.705.615.405                   Due from Customer
Cadangan Kerugian Penurunan                                                                      Allowance for Impairment
  Nilai                                      (228.686.088)            (214.657.560)                              Losses
Total                                        2.920.592.100            1.490.957.845                                  Total


Rincian tagihan bruto kepada pemberi kerja                      Details of gross amount due from customers based
berdasarkan pelanggan adalah sebagai berikut:                   on customer are as follows:

                                                                                      2026                   2025
                                                                                       Rp                     Rp

Pihak Berelasi (Catatan 52)/ Related Parties (Note 52)                                 858.033.272            782.671.010
Dikurangi/ Less: Cadangan Kerugian Penurunan Nilai/
  Allowance for Impairment Losses                                                     (102.691.737)           (98.132.205)
Subtotal                                                                               755.341.535            684.538.805


                                                           67

Page 77
PT WIJAYA KARYA (PERSERO) Tbk                                                 PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                           AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                    FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                        For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                 June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                               And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                              Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                            (In Thousand Rupiah, unless Otherwise Stated)
                                                                                     2026                    2025
                                                                                      Rp                      Rp
Pihak Ketiga/ Third Parties                                                         2.291.244.916             922.944.395
Dikurangi/ Less: Cadangan Kerugian Penurunan Nilai/
  Allowance for Impairment Losses                                                   (125.994.351)          (116.525.355)
Subtotal                                                                            2.165.250.565            806.419.040
Total                                                                               2.920.592.100          1.490.957.845


Mutasi cadangan kerugian penurunan nilai tagihan            The movements of allowance for impairment losses
bruto adalah sebagai berikut:                               on gross amount due from customers are as follows:

                                                                                    2026                   2025
                                                                                     Rp                     Rp
Saldo Awal/ Beginning Balance                                                        214.657.560             228.221.370
Penambahan/ Additional                                                                 45.306.364             89.792.583
Pemulihan/ Recovery                                                                  (31.277.836)          (103.356.393)
Saldo Akhir/ Ending Balance                                                          228.686.088             214.657.560


Manajemen Grup berkeyakinan bahwa cadangan                      Management of the Group believes that the
kerugian penurunan nilai atas tagihan bruto ke                  allowance for impairment losses on gross amount
pemberi kerja cukup untuk menutup kemungkinan                   due from customers is sufficient to cover possible
kerugian di masa depan dari tidak tertagihnya                   losses on uncollectible of due from customers in the
tagihan bruto.                                                  future.

9. Piutang Yang Belum Ditagih                                                               9. Unbilled Receivables
                                                                                     2026                   2025
                                                                                      Rp                     Rp
Pelanggan/ Customer WIKA Beton                                                        404.179.943            438.413.568
Pelanggan/ Customer WIKA IKON                                                          94.015.115              5.118.749
Pelanggan/ Customer WIKA Bitumen                                                       28.159.981             28.159.981
Pelanggan/ Customer WIKA Tirta Jaya Jatiluhur                                          26.316.555              4.048.969
Piutang Perusahaan/ the Company's Receivable                                           15.085.209             15.085.209
Pelanggan/ Customer WIKA Gedung                                                         6.239.919              8.400.641
Pelanggan/ Customer WIKA Serpan                                                           198.780                240.282
Pelanggan/ Customer WIKA Rekon                                                                  --             1.836.521
Subtotal                                                                              574.195.503            501.303.920
Dikurangi/ Less : Cadangan Kerugian Penurunan Nilai/
  Allowance for Impairment Losses                                                     (12.600.842)          (10.570.443)
Total                                                                                 561.594.661           490.733.477


Akun ini merupakan piutang usaha yang belum                     This account represents unbilled accounts
ditagihkan selain dari aktivitas pelaksanaan proyek.            receivables arising from activities other than project
                                                                construction activities.

Mutasi cadangan kerugian penurunan nilai piutang                The movements of allowance for impairment losses
yang belum ditagih adalah sebagai berikut:                      on unbilled receivables are as follows:

                                                                                     2026                   2025
                                                                                      Rp                     Rp
Saldo Awal/ Beginning Balance                                                           10.570.443              5.666.201
Penambahan/ Additional                                                                  16.218.041              8.444.363
Pemulihan/ Recovery                                                                   (14.187.642)            (3.540.121)
Saldo Akhir/ Ending Balance                                                             12.600.842            10.570.443


                                                           68

Page 78
PT WIJAYA KARYA (PERSERO) Tbk                                                PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                          AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                       NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                   FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                        For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                 June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                               And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                              Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                            (In Thousand Rupiah, unless Otherwise Stated)
Manajemen Grup berkeyakinan bahwa cadangan                      Management of the Group believes that the
kerugian penurunan nilai atas piutang yang belum                allowance for impairment losses on unbilled
ditagih cukup untuk menutup kemungkinan kerugian                receivables is sufficient to cover possible losses on
di masa depan dari tidak tertagihnya piutang yang               uncollectible of unbilled receivables in the future.
belum ditagih.

10. Piutang Lain-lain                                                                         10. Other Receivables

                                                                                     2026                   2025
                                                                                      Rp                     Rp

Pihak Berelasi (Catatan 52)/ Related Parties (Note 52)                              1.680.680.136          1.723.068.944
  Dikurangi/Less :Cadangan Kerugian Penurunan Nilai/
    Allowance for Impairment Losses                                                (1.468.758.199)       (1.471.349.987)
  Subtotal                                                                             211.921.937           251.718.957
Pihak Ketiga/ Third Parties                                                            16.313.576             33.408.665
  Dikurangi/ Less :Cadangan Kerugian Penurunan Nilai/
    Allowance for Impairment Losses                                                    (5.128.782)            (5.728.193)
  Subtotal                                                                             11.184.794             27.680.472
Total                                                                                 223.106.731            279.399.429


Mutasi cadangan kerugian penurunan nilai piutang                The movements of allowance for impairment losses
lain-lain adalah sebagai berikut:                               on other receivables are as follows:

                                                                                     2026                   2025
                                                                                      Rp                     Rp
Saldo Awal/ Beginning Balance                                                       1.477.078.180          1.373.052.109
Penambahan/ Additional                                                                   3.632.621           110.328.162
Pemulihan/ Recovery                                                                    (6.823.820)            (6.302.091)
Saldo Akhir/ Ending Balance                                                         1.473.886.981          1.477.078.180


Manajemen Grup berkeyakinan bahwa cadangan                      Management of the Group believes that the
kerugian penurunan nilai atas piutang lain-lain cukup           allowance for impairment losses on other
untuk menutup kemungkinan kerugian di masa                      receivables is sufficient to cover possible losses on
depan dari tidak tertagihnya piutang lain-lain.                 uncollectible of other receivables in the future.

Pada tahun 2025, uang muka investasi telah                      For year 2025, the investment advance was
direklasifikasi ke piutang lain-lain dari BPUI sebesar          reclasiffied to other receivable from BPUI amounting
Rp223.590.864 (Catatan 12) merupakan nilai yang                 to Rp223,590,864 (Note 12) is the recoverable value
dapat terpulihkan atas properti milik PT Asuransi               of property owned by PT Asuransi Jiwasraya
Jiwasraya (Persero) melalui Konsorsium Karya yang               (Persero) through the Karya Consortium which was
terbentuk berdasarkan perjanjian Konsorsium                     formed based on the Consortium agreement dated
tanggal 4 Oktober 2018 dengan No. 031-2/2018/077.               October 4,2018 No. 031-2/2018/077. Based on Deed
Berdasarkan Akta No. 166 tentang Perjanjian                     No. 166 concerning the Agreement for the Release
Pelepasan Tanda Minat tanggal 31 Juli 2025, Akta                of Interests dated July 31, 2025, Deed No. 167
No. 167 tentang Perjanjian Penyelesaian Tanda                   concerning the Agreement for the Settlement of
Minat tanggal 31 Juli 2025, dan Akta No. 168 tentang            Interests dated July 31, 2025, and Deed No. 168
Pernyataan dan Kesanggupan tanggal 31 Juli 2025,                concerning the Statement and Undertaking dated
BPUI memiliki kewajiban untuk               melakukan           July 31, 2025, BPUI has an obligation to make a
penyelesaian berupa pemberian/penyerahan atas                   settlement in the form of granting/handing over the
tanda minat Konsorsium Karya dalam waktu 7 (tujuh)              interest of the Karya Consortium within 7 (seven)
tahun secara bertahap.                                          years in stages.




                                                           69

Page 79
PT WIJAYA KARYA (PERSERO) Tbk                                                    PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                              AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                           NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                       FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                          For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                   June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                                 And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                                Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                              (In Thousand Rupiah, unless Otherwise Stated)
11.     Persediaan                                                                                        11. Inventories

                                             2026                       2025
                                              Rp                         Rp
Barang Jadi                                                                                                 Finished Goods
  Produk Beton                                663.466.152                524.394.979                   Concrete Products
  Persediaan Konversi Energi                    4.011.497                 21.970.145       Conversion Energy Inventories
  Produk Konstruksi Baja                                                                              Steel Structure and
    dan Otomotif                               21.317.749                 27.147.435             Automotives Products
  Persediaan Aspal                              4.563.016                  4.563.016                  Asphalt Inventories
  Barang Assembly                               3.068.895                  3.454.695                     Assembly Goods
  Air Minum Curah                                  35.630                     36.830                 Bulk Drinking Water
Hotel                                           6.146.571                  7.404.178                                    Hotel
Barang dalam Proses                                                                                         Work in Process
  Suku Cadang Otomotif dan                                                                    Automotive Spareparts and
    Konversi Energi                            89.417.656                 69.352.072                Conversion Energy
  Air Minum                                             --                     6.352                       Drinking Water
Bahan Baku                                                                                                    Raw Materials
  Metal dan Otomotif                          206.892.493                144.151.429                Metal and Automotive
  Beton dan Semen                             202.161.346                246.228.791               Concrete and Cement
  Konstruksi                                  129.573.511                 46.624.493                         Construction
  Bahan Material                                  571.005                    406.816                        Raw Material
Suku Cadang                                                                                                      Spareparts
  Peralatan Produksi                           24.152.434                 25.472.416              Production Equipments
Aset Real Estat                                                                                          Real Estate Assets
  Bangunan Dalam Konstruksi                 2.663.708.844              2.719.969.715        Buildings Under Construction
  Bangunan Jadi                             2.015.378.912              2.027.156.369                             Buildings
  Tanah Sedang Dikembangkan                 1.775.390.183              1.778.931.102                Land in Development
  Tanah Matang                                  6.170.096                  6.221.759              Land Available for Sale
  Aset Bunga PSAK 115                          61.103.198                          --          Interest Assets PSAK 115
Total                                       7.877.129.188              7.653.492.592                                   Total


Manajemen Grup berkeyakinan bahwa cadangan                        Management of the Group believes that the
kerugian penurunan nilai atas persediaan cukup                    allowance for impairment losses on inventories is
untuk menutup kemungkinan kerugian di masa                        sufficient to cover possible losses in the future.
depan.

Bangunan dalam konstruksi dalam aset real estat                   Buildings under construction of real estate assets
terdiri dari:                                                     consists of:
                                                                                        2026                   2025
                                                                                         Rp                     Rp

Proyek Pasar Bendungan Hilir                                                             911.342.006            924.730.371
Urban Sky                                                                                696.485.279            697.122.368
Tamansari Emerald                                                                        339.177.792            340.702.604
Tamansari Cendekia                                                                       255.068.303            271.866.135
Tamansari Skyhive                                                                        193.872.136            204.821.625
Tamansari Bintaro Mansion                                                                127.310.351            127.302.905
Tamansari Skylounge Makassar                                                              76.177.061             83.671.285
Tamansari JD Savega Senen                                                                 24.242.517             24.298.890
Tamansari Metropolitan Manado                                                              9.383.602             10.841.805
Tamansari Palembang                                                                        9.277.280              8.991.012
Lain-lain (masing-masing di bawah Rp10.000.000)/
  Others (each below Rp10,000,000)                                                         21.372.517            25.620.715
Total                                                                                   2.663.708.844         2.719.969.715



                                                             70

Page 80
PT WIJAYA KARYA (PERSERO) Tbk                                                  PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                            AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                         NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                     FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                         For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                  June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                                And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                               Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                             (In Thousand Rupiah, unless Otherwise Stated)
Bangunan dalam konstruksi merupakan biaya                       Buildings under construction consist of acquisition
perolehan bangunan rumah tinggal, rumah kantor,                 cost of houses, home offices, apartments and offices
apartemen dan perkantoran yang masih dalam                      under construction, net of costs of sales recognized
proses konstruksi setelah dikurangi dengan                      based on the project’s percentage of completion.
pengakuan beban pokok penjualan berdasarkan                     Management believes that there are no constraints in
persentase penyelesaian proyek. Manajemen                       the completion of the projects.
berpendapat tidak terdapat hambatan dalam
penyelesaian proyek.

Bangunan jadi terdiri dari:                                     Buildings consists of:

                                                                                         2026                2025
                                                                                          Rp                  Rp

Tamansari Iswara                                                                         488.117.903          490.011.500
Tamansari Skylounge Balikpapan                                                           409.930.000          413.464.362
Tamansari Lagoon                                                                         261.237.154          262.258.557
Tamansari Jivva                                                                          205.184.157          205.898.615
Tamansari Jineng                                                                         145.596.758          145.596.758
Tamansari Skylounge Makassar                                                             112.212.317          113.304.351
Tamansari Tera                                                                            76.233.869           76.233.869
Tamansari Mahogany                                                                        74.486.488           73.778.155
Tamansari Bintaro Mansion                                                                 44.445.915           44.445.915
Area Komersil La Grande                                                                   43.607.307           43.607.307
Tamansari Panoramic                                                                       42.190.795           42.190.795
Apartemen Capitol                                                                         20.580.656           20.580.656
Tamansari Bale Hinggil                                                                    17.222.727           17.222.727
Apartemen Sentra Land                                                                     15.606.114           15.606.114
Tamansari La Grande                                                                       14.759.240           14.759.240
Lain-lain (masing-masing di bawah Rp10.000.000)/
  Others (each below Rp10,000,000)                                                      43.967.512             48.197.448
Total                                                                                2.015.378.912          2.027.156.369


Bangunan jadi merupakan apartemen, kios, counter,               A building represents apartments, kiosks, counters,
perkantoran, rumah dan ballroom yang telah selesai              offices, houses and ballrooms which had been
pembangunannya dan siap untuk dijual.                           completed and ready for sale.

Tamansari Bintaro Mansion                                       Tamansari Bintaro Mansion
Pada tahun 2025, WIKA Realty melakukan                          In 2025, WIKA Realty sold Patra House to
penjualan Rumah Patra kepada PT Gaharu Delapan                  PT Gaharu Delapan Delapan Property, with part of
Delapan Property dengan sebagian pembayaran                     the consideration settled through non-cash
dilakukan dalam bentuk non-kas berupa 48 unit                   consideration in the form of 48 units of Tamansari
Apartemen Tamansari Bintaro Mansion senilai                     Bintaro    Mansion    apartments    amounting   to
Rp43.747.500.                                                   Rp43,747,500.

Apartemen Capitol Park                                          Capitol Park Apartment
Persediaan Apartemen Capitol Park sebanyak 10                   Inventory Capitol Park Apartment consists of 10 unit
unit seluas 581,25 meter persegi yang terletak di               581.25 meter square wide located at Jalan Salemba
Jalan Salemba Raya No. 16, Kenari, Jakarta Pusat.               Raya No. 16, Kenari, Central Jakarta.




                                                           71

Page 81
PT WIJAYA KARYA (PERSERO) Tbk                                                 PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                           AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                    FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                        For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                 June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                               And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                              Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                            (In Thousand Rupiah, unless Otherwise Stated)
Apartemen Capitol Park diperoleh berdasarkan                    Capitol Park Apartment was acquired in accordance
Berita Acara Kesepakatan Pembayaran pada 23                     with Payment Agreement Minutes dated December
Desember     2025   antara    Perusahaan     dan                23, 2025 between the Company and PT Wikaraga
PT Wikaraga Sapta Utama dengan harga perolehan                  Sapta Utama with a carrying amount of
sebesar Rp28.615.941. Berdasarkan Laporan KJPP                  Rp28,615,941. Based on KJPP Report No.
No. 00114/2.0095-04/PI/05/0090/1/X/2025 oleh                    00114/2.0095-04/PI/05/0090/1/X/2025       by    KJPP
KJPP Ruky, Safrudin & Rekan pada tanggal 30                     Ruky, Safrudin & Rekan dated October 30, 2025, the
Oktober 2025, nilai wajar persediaan adalah                     fair value of inventory is amounting to Rp30,021,310.
sebesar Rp30.021.310. Penilaian dilakukan dengan                The valuation was conducted using a market
pendekatan pasar dengan metode perbandingan                     approach with a market data comparison method.
data pasar.

Tanah sedang dikembangkan terdiri dari:                         Land in development consist of:
                                                                                     2026                   2025
                                                                                      Rp                     Rp

Kantor Pusat (Tanah Wanasari)                                                         611.618.575            611.537.694
Tamansari Parangloe                                                                   426.573.355            426.523.355
Tamansari Palembang                                                                   327.803.433            328.833.633
Tamansari Cyber                                                                       138.234.822            139.422.206
Tamansari Metropolitan Manado                                                         129.311.012            130.832.585
Tamansari Grand Samarinda                                                              50.567.602             50.507.122
Tamansari Sepinggan                                                                    37.339.663             37.339.663
Tamansari Kahyangan Kendari                                                            24.908.912             24.908.912
Tamansari Puri Bali 2                                                                  17.200.270             17.193.392
Tanah Antang                                                                           11.832.540             11.832.540
Total                                                                               1.775.390.183          1.778.931.102



Laporan kemajuan tanah sedang dikembangkan                      The progress report on the land in development as of
pada tanggal 30 Juni 2026 dan 31 Desember 2025                  June 30, 2026 and December 31, 2025 are as
sebagai berikut:                                                follows:

                                                                                     2026                   2025
                                                                                      Rp                     Rp

Kantor Pusat (Tanah Wanasari)                                                         611.618.575            611.537.694
Tamansari Parangloe                                                                   426.573.355            426.523.355
Tamansari Palembang                                                                   327.803.433            328.833.633
Tamansari Cyber                                                                       138.234.822            139.422.206
Tamansari Metropolitan Manado                                                         129.311.012            130.832.585
Tamansari Grand Samarinda                                                              50.567.602             50.507.122
Tamansari Sepinggan                                                                    37.339.663             37.339.663
Tamansari Kahyangan Kendari                                                            24.908.912             24.908.912
Tamansari Puri Bali 2                                                                  17.200.270             17.193.392
Tanah Antang                                                                           11.832.540             11.832.540
Total                                                                               1.775.390.183          1.778.931.102




                                                           72

Page 82
PT WIJAYA KARYA (PERSERO) Tbk                                                      PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                             NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                         FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                             For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                      June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                                    And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                                   Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                                 (In Thousand Rupiah, unless Otherwise Stated)
                                                                                              2026
                                                                                                                      Persentase
                                                                                                                     Penyelesaian /
                                                         Nilai tercatat /               Nilai kontrak /              Percentage of
                                                        Carrying amount                 Contract value                Completion
                                                                Rp                            Rp                          %
Kantor Pusat (Tanah Wanasari)                                      611.618.575                 610.882.694                100,00
Tamansari Parangloe                                                426.573.355                 940.947.117                 45,33
Tamansari Palembang                                                327.803.433                 469.205.555                 69,86
Tamansari Cyber                                                    138.234.822                 145.297.840                 95,14
Tamansari Metropolitan Manado                                      129.311.012                 171.652.906                 75,33
Tamansari Grand Samarinda                                           50.567.602                  61.048.025                 82,83
Tamansari Sepinggan                                                 37.339.663                 101.556.000                 36,77
Tamansari Kahyangan Kendari                                         24.908.912                  27.718.556                 89,86
Tamansari Puri Bali 2                                               17.200.270                  61.048.025                 28,17
Tanah Antang                                                        11.832.540                  11.832.540                100,00
Total                                                            1.775.390.183               2.210.596.765

                                                                                               2025
                                                                                                                       Persentase
                                                                                                                      Penyelesaian /
                                                            Nilai tercatat /            Nilai kontrak /               Percentage of
                                                           Carrying amount              Contract value                 Completion
                                                                   Rp                         Rp                           %
Kantor Pusat (Tanah Wanasari)                                      611.537.694                  610.057.339                100,00
Tamansari Parangloe                                                426.523.355                1.092.331.532                 39,05
Tamansari Palembang                                                328.833.633                  469.205.555                 70,08
Tamansari Cyber                                                    139.422.206                  171.652.906                 81,22
Tamansari Metropolitan Manado                                      130.832.585                  145.597.840                 89,86
Tamansari Grand Samarinda                                           50.507.122                   61.048.025                 82,73
Tamansari Sepinggan                                                 37.339.663                  101.556.000                 36,77
Tamansari Kahyangan Kendari                                         24.908.912                   27.718.556                 89,86
Tamansari Puri Bali 2                                               17.193.392                   61.048.025                 28,16
Tanah Antang                                                        11.832.540                   11.832.540
Total                                                            1.778.931.102                2.752.048.318



Tanah sedang dikembangkan merupakan tanah                        The land being developed represent a land which is
yang    masih    dalam     proses     pematangan,                in the maturation stage, the plotting of land, to build
pembentukan kavling, pembentukan sarana dan                      of facilities and infrastructure until the land is ready
prasarana sampai tanah tersebut siap dibangun.                   to built.

Rincian tanah yang sedang dikembangkan pada                      Details of the land being developed as of June 30,
tanggal 30 Juni 2026 beserta luas dan nomor HGB                  2026 along with the area and number of the HGB
adalah sebagai berikut:                                          are as follows:

                                        Lokasi /     Luas / Area                              Bukti Kepemilikan/
                                       Location       m2 / sqm                               Ownership Evidence
                                                   (satuan penuh)

Tamansari Parangloe                    Makassar         810.000     HGB No 24022, 24023, 24024, 24025, 24026, 24027, 24028,
                                                                    24029, 24030, 24031, 24032, 24033, 24034, 24035, 24036,
                                                                    24037, 24038 atas nama/on behalf of PT Dinamika Panca Gemilang
                                                           54.000   Proses Penurunan Hak dan Balik Nama/
                                                                    In Process of Transfer of Rights and Transfer of Name
Tamansari Palembang                    Palembang           69.067   SHGB atas nama/ on behalf of PT Gema Sukses Jaya
Tamansari Metropolitan Manado           Manado             38.391   HGB atas nama/ on behalf of PT Graha Blessing Family
Tamansari Cyber                          Bogor             39.102   SHGB No 1005, 1006, 1908 & 1910 atas nama/
                                                                    on behalf of PT Cyberindo Persada Nusantara
Tamansari Grand Samarinda              Samarinda           61.993   SHGB Induk No 01 atas nama/ on behalf of PT Daksa Kalimantan Putra
                                                                    SHGB No 3122, 2106 atas nama/ on behalf of WIKA Realty
                                                                    dan Sertifikat Rincik atas nama WIKA Realty/
                                                                    on behalf of WIKA Realty and Field
                                                                    Certificate on behalf of WIKA Realty

                                                            73

Page 83
PT WIJAYA KARYA (PERSERO) Tbk                                                          PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                    AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                 NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                             FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                                 For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                          June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                                        And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                                       Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                                     (In Thousand Rupiah, unless Otherwise Stated)
                                           Lokasi /        Luas / Area                                 Bukti Kepemilikan/
                                          Location          m2 / sqm                                 Ownership Evidence
                                                         (satuan penuh)
Tamansari Sepinggan                       Balikpapan            22.590 SHGB No. 970 dan surat ukur no 379/ sepinggan/2000
                                                                        atas nama Marlene Wijaya / and measuring letter no
Tamansari Puri Bali 2                       Depok                9.563 Sertifikat Rincik atas nama WIKA Realty/
                                                                        Field Certificate on behalf of WIKA Realty
Tamansari Kahyangan Kendari                Kendari              32.816 HGB 00019 & 00020 dan sertifikat / and
                                                                        certificate M00479
                                                                        379/ sepinggan/ 2000 on behalf Marlene Wijaya
Tanah Wanasari                            Karawang           1.300.000 Perubahan dan Pernyataan Kembali Perjanjian Kerjasama Nomor 116
                                                                        tanggal 16 Desember 2019 antara PT WIKA Realty dengan
                                                                        PT Rejeki Bersama Teman (RBT)
Tamansari Pelabuhan Ratu                Pelabuhan Ratu           7.188 HGB No.251 atas nama PT WIKA Realty / on behalf of PT WIKA Realty


Tanah matang terdiri dari:                                         Land available for sale consists of:

                                                                                                 2026                          2025
                                                                                                  Rp                            Rp

Tamansari Grand Samarinda                                                                            4.468.452                   4.509.633
Tamansari Kahyangan Kendari                                                                            623.005                     623.005
Tamansari Metropolitan Manado                                                                          380.302                     380.302
Tamansari Puri Bali                                                                                    255.783                     255.783
Tamansari Pelabuhan Ratu                                                                               226.220                     236.702
Tamansari Persada Bogor                                                                                216.334                     216.334
Total                                                                                                6.170.096                   6.221.759


Rincian tanah matang pada tanggal 30 Juni 2026                        Details of land available for sale as of June 30,
beserta luas dan nomor HGB adalah sebagai                             2026 along with the area and number of the HGB
berikut:                                                              are as follows:
                                           Lokasi /        Luas / Area                             Bukti Kepemilikan/
                                          Location          m2 / sqm                              Ownership Evidence

Unit Penjualan Aset/ Asset sales unit       Aceh                    878 HGB No. 2005 atas nama/ on behalf
                                                                        PT Wijaya Karya Realty
Tamansari Pelabuhan Ratu                Pelabuhan Ratu            7.188 HGB No. 251 atas nama/ on behalf
                                                                        PT Wijaya Karya Realty
Tamansari Persada Bogor                     Bogor                   286 HGB No. 3634 atas nama/ on behalf
                                                                        PT Wijaya Karya Realty
Tamansari Grand Samarinda                 Samarinda               7.485 SHGB No. 01 & Sertifikat Rincik atas nama/ on behalf
                                                                        PT Wijaya Karya Realty
Tamansari Palembang                       Palembang                 305 SHGB No. B 5244 atas nama/ on behalf
                                                                        PT Gema Sukses Jaya
Tamansari Kahyangan Kendari                Kendari                  904 SHGB No. 51, SHM No. 651, 642, 645, 647, 536 atas
                                                                        nama Kingbert Benly/ on behalf of Kingbert Benly
Tamansari Puri Bali II                      Depok                   300 SHGB No. 2871 dan 2872 atas nama WIKA Realty/
                                                                        on behalf of WIKA Realty
Tamansari Metropolitan Manado              Manado                   322 SHGB No.2830 atas nama PT Graha Blessing Family/
                                                                        on behalf of PT Graha Blessing Family
Tamansari Puri Bali                         Depok                   300 SHM No. 2341 atas nama/ on behalf of M. Ichsan


Jumlah persediaan yang dibebankan ke beban                            The amount of inventories charged to cost of
pokok pendapatan untuk tahun-tahun yang berakhir                      revenues for the years ended June 30, 2026 and
pada 30 Juni 2026 dan 2025 masing-masing                              2025    amounted      to     Rp25,863,099  and
sebesar Rp25.863.099 dan Rp109.153.054.                               Rp109,153,054, respectively.

Sebagian persediaan real estat telah diasuransikan                    Some real estate inventories are insured with
kepada PT Asuransi Candi Utama dengan total                           PT Asuransi Candi Utama with total coverage
pertanggungan pada 30 Juni 2026 dan 31 Desember                       amounting     to    Rp2,514,500,000  as    of
2025 sebesar Rp2.514.500.000                                          June 30, 2026 and December 31, 2025.


                                                                 74

Page 84
PT WIJAYA KARYA (PERSERO) Tbk                                                   PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                             AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                          NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                      FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                        For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                 June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                               And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                              Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                            (In Thousand Rupiah, unless Otherwise Stated)
Manajemen berpendapat bahwa nilai pertanggungan                 Management believes that the insurance coverage is
tersebut cukup untuk menutupi kemungkinan                       adequate to cover possible losses.
kerugian.

Sebagian persediaan digunakan sebagai jaminan                   Some inventories are used as collateral for the
atas pinjaman jangka pendek dan jangka panjang                  Group’s short-term and long-term loans (Notes 26
Grup (Catatan 26 dan 37).                                       and 37).

Pada tahun 2025, WIKA Realty mereklasifikasi tanah              On 2025, WIKA Gedung reclassified land and
dan bangunan Tamansari Gangga menjadi properti                  building into investment property amounting to
investasi masing-masing sebesar Rp110.306.080                   Rp110,306,080 and Rp695,733,459, respectively
dan Rp695.733.459 (Catatan 19).                                 (Note 19).

12.   Uang Muka                                                                              12. Advance Payments

                                             2026                      2025
                                              Rp                        Rp
Pemasok                                        85.198.852               88.929.278                              Supplier
Subkontraktor                                  39.725.130               82.645.958                       Subcontractor
Investasi                                      11.142.141               11.142.141                           Investment
Lain-lain                                     187.558.758              175.939.014                               Others
Subtotal                                      323.624.881              358.656.391                             Sub Total
Dikurangi:                                                                                                        Less:
  Cadangan Kerugian                                                                                     Allowance for
    Penurunan Nilai                          (90.000.000)              (90.000.000)              Impairment Losses
Total                                        233.624.881               268.656.391                                Total


Uang Muka Investasi                                             Advance Payment on Investment

• Pada 1 Juni 2023, berdasarkan Keputusan Para                  •   As of June 1, 2023, based on the Shareholders'
  Pemegang Saham diluar Rapat Umum Pemegang                         Decision outside the General Meeting of
  saham PT Pilar Sinergi BUMN Indonesia (PSBI),                     Shareholders of PT Pilar Sinergi BUMN Indonesia
  Perusahaan melakukan setoran uang muka untuk                      (PSBI), the Company made a advance payment
  kebutuhan     operasional    PSBI    sebesar                      for PSBI's operational needs amounting to
  Rp11.142.141.                                                     Rp11,142,141.

Uang Muka Pemasok dan Kontraktor                                Advance Payment on Supplier and Contractor
Uang muka yang diberikan kepada pemasok dan                     Advances paid to suppliers and subcontractors in
subkontraktor      sehubungan     dengan      kontrak           connection with contract of project work operation
pelaksanaan pekerjaan proyek, serta pengadaan                   and procurement of construction raw materials and
bahan baku dan material konstruksi di proyek.                   construction materials at the project.
Uang muka lain-lain                                             Other Advances
Uang muka lain-lain merupakan pembayaran dimuka                 Other advances represent an upfront payment by
oleh WIKA Realty untuk pembelian 14 (empat belas)               WIKA Realty for the purchase of 14 (fourteen) units of
unit Apartemen Sudirman Suite yang dikembangkan                 the Sudirman Suite Apartment developed by PT
oleh PT Kantaraya Utama sebesar Rp33.973.667,                   Kantaraya Utama amounting to Rp33,973,667,
pembayaran Kerjasama Pengembangan Tanah                         payment for the Cilegon Land Development
Cilegon dengan PT Lumbung Usaha Sejahtera                       Cooperation with PT Lumbung Usaha Sejahtera in
sesuai     dengan     Perjanjian    No.   HK.02.09/             accordance with        Agreement No.       HK.02.09/
A.DIR.WR.0254/2018 tanggal 14 Februari 2018                     A.DIR.WR.0254/2018 dated February 14, 2018
sebesar Rp24.473.848 dan uang muka pembelian                    amounting to Rp24,473,848 and the down payment
properti investasi kepada PT Sari Indah Lestari yang            for the purchase of investment property to PT Sari
telah dibatalkan sesuai dengan keputusan BANI                   Indah Lestari which has been canceled in accordance
No. 45084/X/ARB-BANI/2022 tanggal 4 Juli 2023                   with BANI decision No. 45084/X/ARB-BANI/2022
sebesar Rp90.000.000.                                           dated July 4, 2023 amounting to Rp90,000,000.

                                                           75

Page 85
PT WIJAYA KARYA (PERSERO) Tbk                                                   PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                             AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                          NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                      FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                        For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                 June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                               And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                              Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                            (In Thousand Rupiah, unless Otherwise Stated)
13.     Biaya Dibayar di Muka                                                                    13. Prepaid Expenses

                                              2026                     2025
                                               Rp                       Rp

Biaya Produksi                                 314.747.111             296.627.051                  Production Expenses
Biaya Usaha                                    158.869.839             124.207.860                   Operating Expenses
Biaya Pengelolaan                               52.698.385              44.789.148                 Management Expenses
Biaya Distribusi                                32.024.940              39.594.032                  Distribution Expenses
Lain-lain                                        3.931.325               3.046.692                                 Others
Total                                          562.271.600             508.264.783                                  Total


Biaya produksi dibayar di muka merupakan transaksi              Prepaid production expenses are transactions that
yang berhubungan langsung dengan proses produksi                are directly related to the production process in this
dalam hal ini pembangunan yang pembayarannya                    case the development of which payment is made in
dilakukan terlebih dahulu.                                      advance.

Biaya pengelolaan dibayar di muka merupakan biaya               Prepaid management expenses represent costs paid
untuk pembukaan kawasan baru yang akan                          in advance for the opening of new areas to be
dikembangkan oleh Grup.                                         developed by the Group.

Biaya usaha dibayar di muka merupakan biaya-biaya               Prepaid operating expenses represent costs incurred
yang dikeluarkan sehubungan dengan kegiatan                     in connection to business activities such as cost of
usaha perusahaan seperti biaya pengusahaan                      project concession, bid and other business expenses.
proyek, tender dan biaya usaha lainnya.

14.     Jaminan Usaha                                                                         14. Business Guarantees

Jaminan usaha untuk tahun yang berakhir pada                    Business Guarantees for the years ended
tanggal 30 Juni 2026 dan 31 Desember 2025                       June 30, 2026 and December 31, 2025 amounted to
masing-masing   sebesar  Rp129.942.736   dan                    Rp129,942,736 and Rp115,831,537, respectively.
Rp115.831.537.

Pada 31 Desember 2025, sebagian besar saldo                     As of December 31, 2025, the majority of the balance
tersebut merupakan jaminan terkait jaminan                      represented project performance guarantees of the
pelaksanaan proyek milik Perusahaan.                            Company.

15.     Pekerjaan dalam Proses Konstruksi                                       15. Construction Work in Progress

                                                                                       2026                  2025
                                                                                        Rp                    Rp
Pihak Berelasi (Catatan 52)/Related Parties (Note 52)                                 2.972.336.199         2.997.725.240
Dikurangi/Less : Cadangan Kerugian Penurunan Nilai/
  Allowance for Impairment Losses                                                    (2.438.776.498)       (2.499.399.826)
  Subtotal                                                                              533.559.701           498.325.414
Pihak Ketiga/Third Parties                                                            2.888.194.007         3.330.970.263
Dikurangi/Less: Cadangan Kerugian Penurunan Nilai/
  Allowance for Impairment Losses                                                    (1.775.991.369)       (1.662.724.435)
  Subtotal                                                                            1.112.202.638         1.668.245.828
Total                                                                                 1.645.762.339         2.166.571.242




                                                           76

Page 86
PT WIJAYA KARYA (PERSERO) Tbk                                                 PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                           AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                    FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                         For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                  June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                                And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                               Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                             (In Thousand Rupiah, unless Otherwise Stated)
Rincian umur pekerjaan dalam proses konstruksi                  The aging of construction working in progress (CWIP)
(PDPK) adalah sebagai berikut:                                  is as follows:
                                                                                      2026                   2025
                                                                                       Rp                     Rp
1-3 Bulan/Months                                                                       558.007.880            653.464.158
3-6 Bulan/Months                                                                       164.629.186            177.916.755
6-12 Bulan/Months                                                                      152.412.816            353.407.635
> 12 Bulan/Months                                                                    4.985.480.323          5.143.906.955
Sub Total                                                                            5.860.530.206          6.328.695.503
Dikurangi/Less : Cadangan Kerugian Penurunan Nilai/
  Allowance for Impairment Losses                                                  (4.214.767.867)        (4.162.124.261)
Total                                                                                1.645.762.339          2.166.571.242


Akun PDPK merupakan biaya yang progresnya                       CWIP account represents costs whose progress has
belum diakui oleh owner, klaim atas pekerjaan yang              not been recognized by the owner, claims for work
masih dalam proses adendum, proses arbitrase, dan               that is still in the addendum process, arbitration
proses mediasi.                                                 process, and mediation process.

Berdasarkan Laporan Badan Pengawasan Keuangan                   Based on Report Financial and Development
dan Pembangunan (BPKP) Nomor PE.09.03/R/S-                      Supervisory Agency (BPKP) Number PE.09.03/R/S-
776/D5/02/2024 tanggal 26 Juli 2024 tentang Hasil               776/D5/02/2024 dated July 26, 2024 concerning the
Evaluasi Hambatan Kelancaran Pembangunan atas                   Results of the Evaluation of Obstacles to Smooth
Proyek LRT Jakarta Koridor 1 (Fase 1) Kelapa                    Development on LRT Jakarta Corridor 1 (Phase 1)
Gading - Velodrome Paket P102 Pekerjaan Utama.                  Kelapa Gading - Velodrome Package P102. Most of
Sebagian besar klaim Perusahaan ke PT Jakarta                   the Company's claims to PT Jakarta Propertindo
Propertindo dikabulkan, sehingga Perusahaan tidak               were granted, therefore the Company not charged
membebankan klaim yang diajukan.                                the claims to expenses.

Berdasarkan       Laporan         BPKP        Nomor             Based on Report BPKP Number PE.09.03/R/LHP-
PE.09.03/R/LHP-03/D502/2/2024 tanggal 29 Februari               03/D502/2/2024 dated February 29, 2024 concerning
2024 tentang Hasil Evaluasi Hambatan Kelancaran                 the Results of the Evaluation of Obstacles to Smooth
Pembangunan atas Penyesuaian Nilai Sisa                         Development on the Adjustment of the Remaining
Pekerjaan Paket 1 Proyek Pengembangan Bandar                    Value of Package 1 of the Sultan Hasanuddin Airport
Udara Sultan Hasanuddin Makassar (Catatan 53).                  Development Project in Makassar (Note 53). Most of
Sebagian besar klaim Perusahaan ke PT Angkasa                   the Company's claims to PT Angkasa Pura I
Pura I (Persero) tidak dikabulkan sehingga pada                 (Persero) were not granted therefore in 2024, the
tahun 2024, Perusahaan mencadangkan klaim ke                    Company reserve the claims to other income and
penghasilan dan beban lain-lain (Catatan 48).                   expenses (Note 48).

Mutasi cadangan kerugian penurunan nilai PDPK                   The movements of allowance for impairment losses
adalah sebagai berikut:                                         on CWIP are as follows:

                                                                                       2026                   2025
                                                                                        Rp                     Rp
Saldo Awal/Beginning Balance                                                          4.162.124.261          2.822.382.295
Penambahan/Additional                                                                    52.643.606          1.420.556.450
Penghapusan/Write off                                                                             --           (55.008.833)
Pemulihan/Recovery                                                                                --           (25.805.651)
Saldo Akhir/Ending Balance                                                            4.214.767.867          4.162.124.261


Manajemen Grup berkeyakinan bahwa cadangan                      The Management of the Group believes that the
kerugian penurunan nilai atas PDPK cukup untuk                  allowance for impairment losses on CWIP is sufficient
menutup kemungkinan kerugian di masa depan dari                 to cover possible losses on uncollectible of working in
tidak tertagihnya pekerjaan dalam proses.                       progress in the future.


                                                           77

Page 87
PT WIJAYA KARYA (PERSERO) Tbk                                                PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                          AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                       NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                   FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                        For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                 June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                               And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                              Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                            (In Thousand Rupiah, unless Otherwise Stated)
16.   Tanah untuk Pengembangan                                                              16. Land for Development

                                                                                     2026                   2025
                                                                                      Rp                     Rp

Tanah/ Land Wanakerta                                                                 615.913.414            614.736.164
Tanah/ Land M.T. Haryono II - Jakarta                                                 314.322.880            314.322.880
Tamansari Gangga Ext. - Bali                                                          108.868.461            108.868.461
Tanah/ Land M.T. Haryono III - Jakarta                                                 82.528.750             82.528.750
Tanah/ Land Steady Safe                                                                80.054.295             80.054.295
Tamansari Grand Samarinda                                                              76.127.892             75.854.773
Tanah/ Land MT. Haryono - Samarinda                                                    37.157.450             37.157.450
Tanah/ Land Skybox                                                                     25.000.000             25.000.000
Tanah/ Land Tanjung Lesung                                                             20.870.050             20.870.050
Tanah/ Land Sinar Kasih                                                                19.685.550             19.685.550
Tanah/ Land Lombok                                                                     19.198.900             19.198.900
Tanah/ Land Parangloe                                                                  16.755.800                      --
Tanah/ Land Pramestha                                                                  15.155.000             15.155.000
Tanah/ Land Bitung Manado                                                              11.456.830             11.456.830
Tamansari Bukit Mutiara                                                                10.389.457             10.389.457
Tanah/ Land Kalimantan Selatan                                                         10.089.000             10.089.000
Unit Penjualan Aset/ Assets Selling Unit                                                3.722.596              3.722.596
Tanah/ Land Kampung Pasir                                                                 281.200                281.200
Total                                                                               1.467.577.525          1.449.371.356


Pada tahun 2025, WIKA Realty melakukan                          As of 2025, WIKA Realty reclassified Land for
reklasifikasi Tanah untuk Pengembangan menjadi                  Development into Land in Development amounting
Tanah        Sedang     Dikembangkan   sebesar                  to Rp11,832,540 (Note 11).
Rp11.832.540 (Catatan 11).

Pada tahun 2025, WIKA Gedung memperoleh Tanah                   In 2025, WIKA Gedung acquired 16 land parcels
SHM sebanyak 16 bidang dengan total luasan                      under SHM title, with a total area of 227,666 sqm,
sebesar 227.666 m2 yang berada di Kecamatan                     located in Sekotong District and Lembar District,
Sekotong dan Kecamatan Lembar, Kabupaten                        West Lombok Regency, West Nusa Tenggara
Lombok Barat, Provinsi Nusa Tenggara Barat                      Province, with an acquisition cost of Rp14,965,087.
dengan nilai perolehan sebesar Rp14.965.087.                    The land was acquired by WIKA Gedung as part of
Tanah tersebut diperoleh WIKA Gedung sebagai                    the settlement of PT Indraco’s obligations to WIKA
bagian dari penyelesaian kewajiban PT Indraco                   Gedung (Note 6). Based on the valuation conducted
kepada WIKA Gedung (Catatan 6). Berdasarkan                     by KJPP Iskandar dan Rekan as stated in KJPP
penilaian yang telah dilakukan oleh KJPP Iskandar               Report No. 00213/2.0118-00/PI/03/0463/1/VII/2024
dan Rekan dalam Laporan KJPP No. 00213/2.0118-                  dated February 15, 2024, the fair value of the land
00/PI/03/0463/1/VII/2024 pada tanggal 15 Februari               amounted to Rp19,198,000. The valuation was
2024, nilai wajar atas tanah tersebut adalah sebesar            performed using the market approach through the
Rp19.198.000.      Penilaian     dilakukan   dengan             market data comparison method.
pendekatan pasar melalui metode perbandingan
data pasar.

Rincian tanah untuk pengembangan berdasarkan                    The details of land for development based on land
luas tanah dan kepemilikan pada 30 Juni 2026                    area and ownership as of 30, 2026 are as follows:
adalah sebagai berikut:




                                                           78

Page 88
PT WIJAYA KARYA (PERSERO) Tbk                                                                                                       PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                                                                 AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                                                              NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                                                                          FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                                                                               For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                                                                        June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                                                                                      And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                                                                                     Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                                                                                   (In Thousand Rupiah, unless Otherwise Stated)
                                                                   Lokasi /              Luas / Area                                    Bukti Kepemilikan/
                                                                  Location                m2 / sqm                                     Ownership Evidence
                                                                                       (satuan penuh)
Tanah/ Land Wanakerta                                     Karawang                           1.500.000 SK No. 06 /NOT/I/2019
                                                                                                       SK No. 72/NOT/VIII/2019
Tanah/ Land MT Haryono II                                 Jakarta                               13.259 SHGB 303, 310, 421, dan/and 276
                                                                                                       PPJB No. HK.02.09/A.DIR.WR.1062/2020
                                                                                                       PPJB No. HK.02.09/A.DIR.WR.1061/2020
Tamansari Gangga Ext. - Bali                              Bali                                  10.880 SHM No. 3754, 3753, 3751 dan / and 3750
Tanah/ Land MT Haryono III                                Jakarta                                2.415 SHGB No.7482. 8005, 8013, 8088, 8082, 8087, 8609, 8096, 8089
                                                                                                       8616, 8617
Tanah/ Land Steady Safe                                   Jakarta                               18.162 SHGB No. 9096
Tamansari Grand Samarinda                                 Samarinda                            833.060 SHGB No. 3122, 3167, 2651, 2108, 2107, 2106 dan/ and 01
Tanah/ Land MT. Haryono - Samarinda                       Samarinda                              1.556 SHGB No.3320
Tanah/ Land Skybox                                        Tangerang Selatan                     20.564 SHGB No. 01965
Tanah/ Land Tanjung Lesung                                Banten                               417.341 SHGB No. 11 dan/ and 178
Tanah/ Land Sinar Kasih                                   Jakarta                               12.581 SHGB No. 307, 308, 309, 312, 442, 443, 7324, 239, 246, 262, 263, 414,
                                                                                                       415, 479 dan/ and 485
Tanah/ Land Lombok                                        Lombok                               227.666 Akta Perikatan Jual Beli No. 287, 290, 293, 296, 299, 302, 305, 308, 311, 314,
                                                                                                       317, 320, 323, 329, 332
Tanah/ Land Pramestha                                     Bandung                                2.730 SHM No. 1308, 1309, 1313, 1314, 1315
Tanah/ Land Bitung Manado                                 Manado                                29.197 PPJB No. HK.02.09/A.DIR.WR.1448/2018
Tamansari Bukit Mutiara                                   Balikpapan                             5.977 HGB No. 1.229
                                                                                                   550 SHGB No.7186
Tanah/ Land Kalimantan Selatan                            Kalimantan Selatan                     4.316 SHGB No.02781, 02782
Unit Penjualan Aset/ Assets Sales Unit                    Pelabuhan Ratu                       291.940 SHGB No. 252 dan/ and 620
Unit Penjualan Aset/ Assets Sales Unit                    TMR Bandung                           50.800 SHGB No. 5297, 5296, 5295, 5294, 5293, 5292 dan/ and 5291
Tanah/ Land Kampung Pasir                                 Bandung                                  592 SHGB No.394
Tanah/ Land Antang                                        Makassar                              20.918 SHGB No. 21679, 21680, 21681, 21682, 21683, 21684, 21685, 21686,
                                                                                                       21687, 21688, 21689, 21690, 21691, 21692, 21693 dan/ and 21808




Sebagian tanah untuk pengembangan digunakan                                                                  Some lands for development are used as collateral
sebagai jaminan atas pinjaman jangka pendek dan                                                              for the Group’s short-term and long-term loans
jangka panjang Grup (Catatan 26 dan 37).                                                                     (Notes 26 and 37).

17.        Investasi Pada Entitas Asosiasi                                                                                                           17. Investments In Associates
                                                                                                       2026
        Nama Entitas Asosiasi/       Domisili/                 Bidang Usaha/                   Persentase    Nilai Tercatat        Penambahan           Bagian Laba (Rugi)    Reklasifikasi/          Nilai Tercatat
         Name of Associates          Domicile                 Type of Business                Kepemilikan/    Awal Tahun/         (Pengurangan)/         Tahun Berjalan/     Reclassification         Akhir Tahun/
                                                                                               Percentage   Carrying Value            Addition            Income (Loss)                              Carrying Value
                                                                                              of Ownership Beginning Balance        (Deduction)              Share in                                Ending Balance
                                                                                                                                                           Current Year
                                                                                                  (%)             Rp                   Rp                       Rp                 Rp                      Rp

PT Hotel Indonesia Properti           Jakarta    Industri realti dan properti jasa/               49,00         1.020.047.003                      --            8.892.075                      --       1.028.939.078
                                                 Realty and property industry
PT Jakarta River City                 Jakarta    Industri realti dan properti jasa/               48,99           968.218.946                      --                (156)                      --         968.218.789
                                                 Realty and property industry
PT PP Semarang Demak                 Semarang    Pembangunan dan pengusahaan jalan tol/           24,90           423.534.595                      --         (50.117.432)                      --         373.417.163
                                                 Construction and development of toll road
PT WIKA Realty Minor Development      Jakarta    Industri realti dan properti jasa/               31,08            60.064.832                      --         (11.985.528)                      --          48.079.304
                                                 Realty and property industry
PT Hotel Karya Indonesia               Bali      Industri realti dan properti jasa/               29,80            16.238.932                      --               68.709                      --          16.307.641
                                                 Realty and property industry
PT Wijaya Karunia Realtindo           Jakarta    Industri realti dan properti jasa/               50,00             3.838.973                      --                   --                      --           3.838.973
                                                 Realty and property industry
PT WIKA Jabar Power                   Jakarta    Pembangkit tenaga listrik/                       20,44             2.553.768                      --                   --                      --           2.553.768
                                                 Power plant industry
PT Patra Wijaya Realtindo             Jakarta    Industri realti dan properti jasa/               30,00             1.771.411                      --                2.239                      --           1.773.650
                                                 Realty and property industry
PT Hotel Indonesia Group              Jakarta    Industri realti dan properti jasa/               49,00             3.244.346          (4.519.457)               1.275.111                      --                     (0)
                                                 Realty and property industry
Sub Total                                                                                                       2.499.512.806          (4.519.457)            (51.864.982)                      --       2.443.128.366
Dikurangi/Less
Cadangan Kerugian Penurunan Nilai/
  Allowance for Impairment Loss                                                                                    (3.838.973)                  --                      --                      --          (3.838.973)
Total                                                                                                           2.495.673.833          (4.519.457)            (51.864.982)                      --       2.439.289.393




                                                                                                        79

Page 89
PT WIJAYA KARYA (PERSERO) Tbk                                                                                                       PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                                                                 AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                                                              NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                                                                          FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                                                                               For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                                                                        June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                                                                                      And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                                                                                     Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                                                                                   (In Thousand Rupiah, unless Otherwise Stated)
                                                                                                      2025
        Nama Entitas Asosiasi/       Domisili/                 Bidang Usaha/                  Persentase    Nilai Tercatat         Penambahan           Bagian Laba (Rugi)    Reklasifikasi/          Nilai Tercatat
         Name of Associates          Domicile                 Type of Business               Kepemilikan/    Awal Tahun/          (Pengurangan)/         Tahun Berjalan/     Reclassification         Akhir Tahun/
                                                                                              Percentage   Carrying Value             Addition            Income (Loss)                              Carrying Value
                                                                                             of Ownership Beginning Balance         (Deduction)              Share in                                Ending Balance
                                                                                                                                                           Current Year
                                                                                                 (%)              Rp                   Rp                       Rp                 Rp                      Rp

PT Hotel Indonesia Properti           Jakarta    Industri realti dan properti jasa/             49,00            968.475.444                       --           51.571.559                      --       1.020.047.003
                                                 Realty and property industry
PT Jakarta River City                 Jakarta    Industri realti dan properti jasa/             48,99            968.273.837                       --             (54.891)                      --         968.218.946
                                                 Realty and property industry
PT PP Semarang Demak                 Semarang    Pembangunan dan pengusahaan jalan tol/         24,90            319.615.721            36.852.000              67.066.874                      --         423.534.595
                                                 Construction and development of toll road
PT WIKA Realty Minor Development      Jakarta    Industri realti dan properti jasa/             31,08              77.253.693                      --         (17.188.861)                      --          60.064.832
                                                 Realty and property industry
PT Hotel Karya Indonesia               Bali      Industri realti dan properti jasa/             29,80              16.108.613                      --             130.319                       --          16.238.932
                                                 Realty and property industry
PT Wijaya Karunia Realtindo           Jakarta    Industri realti dan properti jasa/             50,00               3.838.973                      --                   --                      --           3.838.973
                                                 Realty and property industry
PT Hotel Indonesia Group              Jakarta    Industri realti dan properti jasa/             49,00              16.665.035         (10.290.000)             (3.130.689)                      --           3.244.346
                                                 Realty and property industry
PT WIKA Jabar Power                   Jakarta    Pembangkit tenaga listrik/                     20,44               2.553.768                      --                   --                      --           2.553.768
                                                 Power plant industry
PT Patra Wijaya Realtindo             Jakarta    Industri realti dan properti jasa/             30,00               1.766.933                      --                4.478                      --           1.771.411
                                                 Realty and property industry
PT Indo Benhil Karunia Jaya           Jakarta    Industri realti dan properti jasa/             30,00            186.571.874         (186.571.874)                      --                      --                     --
                                                 Realty and property industry
PT Gesits Motor Nusantara             Jakarta    Industri Otomotif/ Automotive Industry         48,95            118.319.731                       --        (118.319.731)                      --                     --
PT Jasamarga Manado - Bitung          Jakarta    Pembangunan dan pengusahaan jalan tol/         20,04             32.692.484                       --         (32.692.484)                      --                     --
                                                 Construction and development of toll road
Sub Total                                                                                                       2.712.136.106        (160.009.874)            (52.613.426)                      --       2.499.512.806
Dikurangi/Less
Cadangan Kerugian Penurunan Nilai/
  Allowance for Impairment Loss                                                                                    (3.838.973)                  --                      --                      --          (3.838.973)
Total                                                                                                           2.708.297.133        (160.009.874)            (52.613.426)                      --       2.495.673.833




PT Hotel Indonesia Properti (“HIPRO”)                                                                        PT Hotel Indonesia Properti (“HIPRO”)
Perusahaan dan WIKA Realty telah kehilangan                                                                  The Company and WIKA Realty have lost control
pengendalian atas HIPRO (Catatan 1.e) dan nilai                                                              over HIPRO (Note 1.e) and the fair value of the
wajar dari sisa investasi pada HIPRO sebesar                                                                 remaining investment in HIPRO amounting to
Rp964.077.440 diakui sebagai biaya perolehan                                                                 Rp964,077,440 is recognized as the initial
awal atas investasi tersebut.                                                                                acquisition cost of the investment.

PT Jakarta River City (“JRC”)                                                                                PT Jakarta River City (“JRC”)
Pada tanggal 30 Juni 2020, berdasarkan Akta No.                                                              On June 30, 2020 based on Deed No. 74 by Notary
74 oleh Notaris Ryan Bayu Candra, S.H., M.Kn., di                                                            Ryan Bayu Candra, S.H., M.Kn., in Jakarta, JRC
Jakarta, JRC menyetujui peningkatan modal disetor                                                            approved the increase in paid-in and issued capital
dan ditempatkan sebesar Rp832.190.000 atau                                                                   amounted to Rp832,190,000 or 832,190 shares,
832.190 lembar, melalui:                                                                                     through:
1. Konversi piutang usaha WIKA Realty sebesar                                                                1. Conversion of WIKA Realty's account receivables
   Rp407.677.000 menjadi modal;                                                                                  amounted to Rp407,677,000 into capital;
2. Setoran tunai dari PT Urban Jakarta Propertindo                                                           2. Cash deposit from PT Urban Jakarta Propertindo
   Tbk sebesar Rp424.513.000; dan                                                                                Tbk amounted to Rp424,513,000; and
3. Selisih penyetoran modal dengan saham yang                                                                3. The difference between paid-in capital and shares
   diterbitkan sebesar Rp1.241 dicatat sebagai                                                                   issued amounting to Rp1,241 is recorded as
   agio saham. Bagian agio saham milik WIKA                                                                      premium for shares. WIKA Realty's share of
   Realty adalah sebesar Rp882.                                                                                  premium is amounted to Rp882.

PT PP Semarang Demak                                                                                         PT PP Semarang Demak
Berdasarkan Akta Pernyataan Keputusan Rapat                                                                  Based on the Deed of Decision of the Shareholders
Pemegang Saham PT PP Semarang Demak No. 3                                                                    Meeting of PT PP Semarang Demak No. 3 dated
tanggal 7 Oktober 2025 dari Notaris Dina Ismawati,                                                           October 7, 2025 from Notary Dina Ismawati, S.H.,
S.H., M.M., di Semarang dan telah mendapat                                                                   M.M. in Semarang and has received Notification of
Penerimaan Pemberitahuan Perubahan Data                                                                      Changes in the Company's Data from the Minister of
Perseroan dari Menteri Hukum dan Hak Asasi                                                                   Law and Human Rights Republic of Indonesia No.
Manusia Republik Indonesia No. AHU-AH.01.03-                                                                 AHU-AH.01.03-0243098, dated October 15, 2025,
0243098, tanggal 15 Oktober 2025, Perusahaan                                                                 the Company increased its share ownership
meningkatkan     kepemilikan    saham      sebesar                                                           amounting to Rp36,852,000 which was reclassified
Rp36.852.000, yang direklasifikasi dari uang muka                                                            from advances payment for investment amounting to
investasi sebesar Rp36.852.000 (Catatan 12) dan                                                              Rp36,852,000 (Note 12) with additional investment
penambahan pada tahun berjalan sebesar                                                                       during   the    current   year    amounting     to
Rp103.918.874.                                                                                               Rp103,918,874.
                                                                                                        80

Page 90
PT WIJAYA KARYA (PERSERO) Tbk                                                 PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                           AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                    FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                        For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                 June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                               And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                              Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                            (In Thousand Rupiah, unless Otherwise Stated)
Berdasarkan Akta Pernyataan Keputusan Rapat                     Based on the Deed of Decision of the Shareholders
Pemegang Saham PT PP Semarang Demak No. 11                      Meeting of PT PP Semarang Demak No. 11 dated
tanggal 30 Mei 2024 dari Notaris Dina Ismawati,                 May 30, 2024 from Notary Dina Ismawati, S.H.,
S.H., M.M., di Semarang dan telah mendapat                      M.M. in Semarang and has received Notification of
Penerimaan Pemberitahuan Perubahan Data                         Changes in the Company's Data from the Minister of
Perseroan dari Menteri Hukum dan Hak Asasi                      Law and Human Rights Republic of Indonesia No.
Manusia Republik Indonesia No. AHU-AH.01.03-                    AHU-AH.01.03-0126687 dated May 31, 2024, the
0126687 tanggal 31 Mei 2024, Perusahaan                         Company increased its share ownership amounting
meningkatkan     kepemilikan    saham      sebesar              to Rp29,133,000 which reclassified from advances
Rp29.133.000, yang direklasifikasi dari uang muka               payment for investment amounting to Rp10,000,000
investasi sebesar Rp10.000.000 (Catatan 12) dan                 (Note 12) and an additional increase in the current
penambahan pada tahun berjalan sebesar                          year amounting to Rp19,133,000.
Rp19.133.000.

Berdasarkan Akta Pernyataan Keputusan Rapat                     Based on the Deed of Decision of the Shareholders'
Pemegang Saham PT PP Semarang Demak No. 7                       Meeting of PT PP Semarang Demak No. 7 dated
tanggal 24 Juni 2024 dari Notaris Dina Ismawati                 June 24, 2024 from Notary Dina Ismawati S.H.,
S.H., M.M., di Semarang dan telah mendapat                      M.M., in Semarang and has received Notification of
Penerimaan Pemberitahuan Perubahan Data                         Changes in Company Data from the Minister of Law
Perseroan dari Menteri Hukum dan Hak Asasi                      and Human Rights of the Republic of Indonesia
Manusia Republik Indonesia No. AHU-AH.01.03-                    No. AHU-AH.01.03-0156718 dated June 24, 2024,
0156718 tanggal 24 Juni 2024, Perusahaan                        the Company increased its share ownership
meningkatkan    kepemilikan   saham     sebesar                 amounting to Rp81,423,000.
Rp81.423.000.

Atas transaksi ini, persentase kepemilikan                      For this transaction, the Company’s percentage of
Perusahaan di PT PP Semarang Demak tidak                        ownership in PT PP Semarang Demak has not
berubah.                                                        changed.

PT WIKA Realty Minor Development (“WRMD”)                       PT WIKA Realty Minor Development (“WRMD”)
WRMD yang bergerak dalam bidang usaha industri,                 WRMD operates in the realty and property industry,
realti dan properti, dan jasa kecuali dalam bidang              and services, except legal and taxation.
hukum dan pajak.

Modal dasar WRMD berjumlah Rp273.500.000                        The authorized capital of WRMD amounted to
yang terbagi atas 273.500 saham dengan nilai                    Rp273,500,000 composed of 273,500 shares with
nominal Rp1.000 per saham. Jumlah modal                         par value of Rp1,000 per share. Total issued and
ditempatkan dan disetor penuh sebanyak 273.500                  fully paid capital are 273,500 shares or amounted to
saham atau sebesar Rp273.500.000 dengan                         Rp273,500,000 with composition as follows:
komposisi sebagai berikut:
• WIKA Realty memiliki 31,08% atau sebanyak                     • WIKA Realty owns 31.08% or 85,000 shares with
    85.000    saham      dengan    nilai  sebesar                 a value of Rp85,000,000; and
    Rp85.000.000; dan
• MHG International Holding (Singapore) PTE.                    • MHG International Holding (Singapore) PTE.
    Limited memiliki 68,92% atau sebanyak 188.500                 Limited owns 68.92% or 188,500 shares with a
    saham dengan nilai sebesar Rp188.500.000.                     value of Rp188,500,000

PT Hotel Karya Indonesia (“HKI”)                                PT Hotel Karya Indonesia (“HKI”)
HKI didirikan berdasarkan Akta Notaris No. 10                   HKI was established based on Notarial Deed No. 10
tanggal 29 Oktober 2018 dari Cintya Ayu Rishanty,               dated October 29, 2018 from Cintya Ayu Rishanty,
S.H., M.Kn., Notaris di Bontang. Akta pendirian                 S.H., M.Kn., Notary in Bontang. The deed of
tersebut telah mendapat pengesahan dari Menteri                 establishment was approved by the Minister of Law
Hukum dan Hak Asasi Manusia Republik Indonesia                  and Human Rights of the Republic of Indonesia
No. AHU-0053574.AH.01.01.Tahun 2018 tanggal                     No.    AHU-0053574.AH.01.01.Tahun      2018    on
9 November 2018. HKI yang bergerak dalam bidang                 November 9, 2018. HKI is engaged in the business
usaha industri real estat yang dimiliki sendiri atau            of self-owned or leased real estate industry and
                                                           81

Page 91
PT WIJAYA KARYA (PERSERO) Tbk                                                  PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                            AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                         NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                     FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                         For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                  June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                                And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                               Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                             (In Thousand Rupiah, unless Otherwise Stated)
disewa dan kawasan pariwisata, serta jasa kecuali               tourism areas, services except in the field of law and
dalam bidang hukum dan pajak.                                   tax.

Pada tahun 2023, PT Hotel Karya Indonesia                       In 2023, PT Hotel Karya Indonesia made
melakukan penyesuaian Modal Dasar, Modal                        adjustments to the Authorized Capital, Issued
Ditempatkan dan Modal Disetor. Sehingga Modal                   Capital and Paid-up Capital. So that the Authorized
Dasar PT Hotel Karya Indonesia menjadi berjumlah                Capital of PT Hotel Karya Indonesia amounted to
Rp208.300.000 yang terbagi atas 208.300 lembar                  Rp208,300,000 which is divided into 208,300 shares
saham masing-masing bernilai nominal sebesar                    each with a nominal value of Rp1,000. The
Rp1.000. Modal Dasar tersebut telah ditempatkan                 Authorized Capital has been placed and paid up as
dan disetor sebanyak 52.075 lembar saham dengan                 many as 52,075 shares with a nominal value of
nilai nominal sebesar Rp52.075.000 dengan rincian               Rp52,075,000 with the following details:
sebagai berikut:
• PT HK Realtindo memiliki 29,80% atau                          •   PT HK Realtindo owns 29.80% or 15,525 shares
    sebanyak 15.525 saham dengan nilai sebesar                      with a value of Rp15,525,000;
    Rp15.525.000;
• PT PP Properti Tbk memiliki 10,60% atau                       •   PT PP Properti Tbk owns 10.60% or 5,500 shares
    sebanyak 5.500 saham dengan nilai sebesar                       with a value of Rp5,500,000;
    Rp5.500.000;
• PT Waskita Karya Realty memiliki 29,80% atau                  •   PT Waskita Karya Realty owns 29.80% or 15,525
    sebanyak 15.525 saham dengan nilai sebesar                      shares with a value of Rp15,525,000; and
    Rp15.525.000; dan
• WIKA Realty memiliki 29,80% atau sebanyak                     •   WIKA Realty owns 29.80% or 15,525 shares with
    15.525    saham     dengan    nilai  sebesar                    a value of Rp15,525,000.
    Rp15.525.000.

PT Wijaya Karunia Realtindo (“WKR”)                             PT Wijaya Karunia Realtindo (“WKR”)
Modal dasar WKR berjumlah Rp50.000.000 yang                     The authorized capital of WKR amounted to
terbagi atas 50.000 saham dengan nilai nominal                  Rp50,000,000 composed of 50,000 shares with par
Rp1.000 per saham. Jumlah modal ditempatkan                     value of Rp1,000 per share. Total issued and fully
dan disetor penuh sebanyak 15.000 saham atau                    paid capital are 15,000 shares or amounted to
sebesar Rp15.000.000 dengan komposisi sebagai                   Rp15,000,000 with composition as follows:
berikut:
• WIKA Realty memiliki 50% atau sebanyak 7.500                  • WIKA Realty owns 50% or 7,500 shares with a
   saham dengan nilai sebesar Rp7.500.000; dan                    value of Rp7,500,000; and
• PT Kurnia Graha Kencana memiliki 50% atau                     • PT Kurnia Graha Kencana owns 50% or 7,500
   sebanyak 7.500 saham dengan nilai sebesar                      shares with a value of Rp7,500,000.
   Rp7.500.000.

Berdasarkan putusan BANI No. 45094/XI/ARB-                      Based on BANI decision no. 45094/XI/ARB-
BANI/2022 tanggal 29 Agustus 2023, WKR sudah                    BANI/2022 dated August 29, 2023, WKR no longer
tidak memiliki hak atas uang muka yang telah                    has the right to the down payment that has been
dibayarkan kepada pemilik tanah. Atas putusan                   paid to the land owner. Based on this decision,
tersebut, WIKA Realty melakukan pencadangan                     WIKA Realty made a full investment reserve to WKR
penuh atas investasi kepada WKR sebesar                         amounting to Rp3,838,973.
Rp3.838.973.

PT WIKA Jabar Power                                             PT WIKA Jabar Power
Modal dasar PT WIKA Jabar Power berjumlah                       The authorized capital of PT WIKA Jabar Power
Rp144.000.000 yang terbagi atas 14.400.000                      amounted to Rp144,000,000 composed of
saham dengan nilai nominal Rp10 per saham.                      14,400,000 shares with par value of Rp10 per share.
Jumlah modal ditempatkan dan disetor penuh                      Total issued and fully paid capital are 4,500,000
sebanyak 4.500.000 saham atau sebesar                           shares or amounted to Rp45,000,000 with
Rp45.000.000 dengan komposisi sebagai berikut:                  composition as follows:
• Perusahaan memiliki 20.44% atau sebanyak                      • The Company owns 20,44% or 920,000 shares
   920.000   saham    dengan    nilai   sebesar                   with a value of Rp9,200,000;
                                                           82

Page 92
PT WIJAYA KARYA (PERSERO) Tbk                                                                                                           PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                                                                     AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                                                                  NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                                                                              FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                                                                               For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                                                                        June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                                                                                      And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                                                                                     Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                                                                                   (In Thousand Rupiah, unless Otherwise Stated)
  Rp9.200.000;
• PT Sari Prima Energi memiliki 71.56% atau                                                                    • PT Sari Prima Energi owns 71,56% or 3,220,000
  sebanyak 3.220.000 saham dengan nilai                                                                          shares with a value of Rp32,200,000;
  sebesar Rp32.200.000;
• PT Jasa Sarana memiliki 4% atau sebanyak                                                                     • PT Jasa Sarana owns 4% or 180,000 shares with
  180.000   saham     dengan  nilai   sebesar                                                                    a value of Rp1,800,000; and
  Rp1.800.000; dan
• PT Roda Manunggal Inti memiliki 4% atau                                                                      • PT Roda Manunggal Inti owns 4% or 180,000
  sebanyak 180.000 saham dengan nilai sebesar                                                                    shares with a value of Rp1,800,000.
  Rp1.800.000.

PT Patra Wijaya Realtindo (“PWR”)                                                                              PT Patra Wijaya Realtindo (“PWR”)
Modal dasar PWR berjumlah Rp12.500.000 yang                                                                    The authorized capital of PWR amounted to
terbagi atas 12.500 saham dengan nilai nominal                                                                 Rp12,500,000 composed of 12,500 shares with par
Rp1.000.000     per    saham.    Jumlah     modal                                                              value of Rp1,000,000 per share. Total issued and
ditempatkan dan disetor penuh sebanyak 12.500                                                                  fully paid capital are 12,500 shares or amounted to
saham atau sebesar Rp12.500.000 dengan                                                                         Rp12,500,000 with composition as follows:
komposisi sebagai berikut:
• WIKA Realty memiliki 30% atau sebanyak 3.750                                                                 • WIKA Realty owns 30% or 3,750 shares with a
    saham dengan nilai sebesar Rp3.750.000; dan                                                                  value of Rp3,750,000; and
• PT WIKA Gedung memiliki 10% atau sebanyak                                                                    • PT WIKA Gedung owns 10% or 1,250 shares with
    1.250 saham dengan nilai sebesar Rp1.250.000;                                                                a value of Rp1,250,000

PT Hotel Indonesia Group (“HIG”)                                                                               PT Hotel Indonesia Group (“HIG”)
Berdasarkan Keputusan Pemegang Saham di Luar                                                                   Based on the Shareholders’ Circular Resolution of
Rapat HIG Nomor 3.002/CR/HIG/VII/2025 tanggal                                                                  HIG No. 3.002/CR/HIG/VII/2025 dated August 15,
15 Agustus 2025, HIG membagikan dividen kepada                                                                 2025, HIG distributed dividends to its shareholders
pemegang saham sebesar Rp21.000.000 dan                                                                        amounting to Rp21,000,000, of which WIKA Realty’s
bagian WIKA Realty sebesar Rp10.290.000, dicatat                                                               portion amounted to Rp10,290,000, recorded as a
sebagai pengurang penyertaan.                                                                                  deduction of investment.

18. Ventura Bersama                                                                                                                                                                   18. Joint Ventures

18.a Investasi pada Ventura Bersama                                                                                                                   18.a Investment in Joint Venture
                                                                                                          2026
         Nama Ventura Bersama/                                        Nama Proyek/                         Porsi Bagi     Nilai Tercatat          Reklasifikasi/      Penambahan         Bagian Laba (Rugi)     Nilai Tercatat
         Name of Joint Venture                                       Name of Project                         Hasil/        Awal Tahun/           Reclassification    (Pengurangan)/       Tahun Berjalan/       Akhir Tahun/
                                                                                                           Portion of    Carrying Value                                  Addition          Income (Loss)       Carrying Value
                                                                                                            Shares      Beginning Balance                              (Deduction)           Portion in        Ending Balance
                                                                                                                                                                                            Current Year
                                                                                                               (%)             Rp                      Rp                 Rp                     Rp                  Rp

WIKA - CRIC - CRDC -CREC - CRSC -         High Speed Railway Jakarta Bandung                                 30,00            4.917.317.749                     --      (175.000.000)           46.981.435         4.789.299.184
CRRC
PT Pilar Sinergi BUMN Indonesia           Transportasi, perdagangan, jasa industri,                          33,36            1.266.738.852                     --         39.188.201        (721.407.031)           584.520.022
                                           pembangunan, perkebunan dan pertanian/
                                           Transportation, trade, service industry,
                                           construction, plantation and agriculture
WIKA GEDUNG - Mutiara Masyhur Sejahtera   Apartemen Prospero                                                 60,00              184.112.024                     --         11.189.431              148.198           195.449.653

WIKA - SRBGC - Adhi Karya                 Jalan Tol Serang Panimbang Seksi III                               22,50              143.882.830                     --          8.162.075              708.020           152.752.925
WIKA - PP - China Road and Bridge Corp    Toll Road Development of Semarang-Demak                            20,00              223.343.118                     --      (100.397.797)           15.225.953           138.171.274
                                           1B (VGF)
WIKA - Penta Ocean - Toyo - PP- Rinkai    Pelabuhan Patimban Paket                                           13,00              116.260.126                     --         15.603.439              298.165           132.161.730
Nissan Constr - Jaya Konstruksi
WIKA - PP                                 Jasa Kontraktor Engineering, Procurement, and                      40,00              109.646.469                     --       (10.000.000)           18.927.214           118.573.683
                                           Construction (EPC) untuk Pengembangan Coal
                                           Handling Facility (CHF), Rail Loop, serta TLS 6
                                           (T4) dan TLS 7 (T5)
WIKA - Jaya Konstruksi                    SPAM Jatiluhur 1                                                   80,00               49.300.224                     --         15.788.585              151.193            65.240.002
WIKA - Obayashi - Jaya Konstruksi - JFE                                                                      19,09               50.366.931                     --                  --           1.374.022            51.740.953
                                          Jakarta Sewerage 1
Engineering
WIKA - PP - KMK - HKI                     Tol Japek Selatan 2A                                               45,00              137.186.639                     --       (89.273.219)             1.601.371           49.514.791
WIKA - Bumi Karsa                         Bendungan Lau Simeme Paket I (MYC)                                 65,00               49.262.575                     --            152.424           (1.492.893)           47.922.106
WIKA - Waskita - PP                       Tol Probolinggo-Banyuwangi Paket 3                                 25,00               51.612.858                     --       (16.583.963)           12.232.237            47.261.132
WIKA - Jaya Konstruksi - KUMAGAI          JSS Paket 3                                                        30,00               45.317.172                     --        (5.000.000)             4.400.489           44.717.660
WIKA - Adhi Karya                         Tol Patimban 4                                                     52,50              102.508.612                     --       (62.264.171)             3.472.366           43.716.807
WIKA - PMJ                                KIPP : Jalan Kawasan Hankam dan Ling                                70                 21.002.298                     --       (12.041.500)           34.332.182            43.292.981
WIKA - WASKITA - JAKON - PP               Tol IKN Segmen 3B-2 Kariangau-Tempad                                45                 35.498.803                     --        (4.721.210)             9.700.891           40.478.483
WIKA - Waskita - Daelim                   Karian Multiporse DAM                                              27,00               37.349.626                     --            281.115                     --          37.630.741
WIKA GEDUNG - Mahoni Citra Persada        Tamansari Mahogany Konstruksi                                      60,00               36.948.616                     --                  --                    --          36.948.616
WIKA - WIKA GEDUNG - Cipta Mandiri                                                                           50,50               43.944.145                     --        (8.477.742)                     --          35.466.403
                                          Pembangunan Sekolah 1
Perencana
WIKA - PP                                 Gedung Financial Mandiri PIK                                       40,00                  7.769.610                   --        (1.523.174)           25.886.255            32.132.691
WIKA - Nindya Karya                       Dusem Segmen 1 Terintegrasi Rancang & Bangun Pembangunan Pipa      51,00                          --                  --                 --           26.074.806            26.074.806
                                          Transmisi Gas Segmen SKG Belawan
WIKA - Jaya Konstruksi                    Sudetan Kali Ciliwung-KBT Lanjutan                                 70,00                        --                    --                 --           25.912.344            25.912.344
PP - WIKA - NINDYA - ADHI                 Tol Sepinggan - Paket 1B (re-tender                                20,00               24.398.148                     --        (1.999.999)              342.053            22.740.202
WIKA - Bina Nusa Lestari                  Irigasi Rentang Package LSS-07                                     60,00               46.627.214                     --       (31.630.080)            7.485.215            22.482.349
WIKA - Aluphi Hijau Lumina                Fuel Fam Depot Dhoho Airport                                       70,00               27.533.508                     --        (6.005.566)              803.368            22.331.309
WIKA - Jaya Konstruksi - KUMAGAI          JSS Paket 2                                                        30,00               23.768.327                     --        (5.000.000)            2.414.238            21.182.564
WIKA - BASUKI                             Bendungan Sukamahi                                                 55,00               20.808.012                     --                 --                    --           20.808.012

                                                                                                          83

Page 93
PT WIJAYA KARYA (PERSERO) Tbk                                                                                                                        PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                                                                                  AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                                                                               NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                                                                                           FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                                                                                              For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                                                                                       June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                                                                                                     And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                                                                                                    Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                                                                                                  (In Thousand Rupiah, unless Otherwise Stated)
                                                                                                              2026
         Nama Ventura Bersama/                                           Nama Proyek/                          Porsi Bagi              Nilai Tercatat          Reklasifikasi/           Penambahan        Bagian Laba (Rugi)       Nilai Tercatat
         Name of Joint Venture                                          Name of Project                          Hasil/                 Awal Tahun/           Reclassification         (Pengurangan)/      Tahun Berjalan/         Akhir Tahun/
                                                                                                               Portion of             Carrying Value                                       Addition         Income (Loss)         Carrying Value
                                                                                                                Shares               Beginning Balance                                   (Deduction)          Portion in          Ending Balance
                                                                                                                                                                                                             Current Year
                                                                                                                  (%)                        Rp                         Rp                    Rp                  Rp                     Rp
                                             Pekerjaan Konstruksi Terintegrasi Rancang dan                       60,00                        22.072.825                        --            (2.985.937)           703.962               19.790.850
WIKA - Jaya Konstruksi                        Bangun Pembangunan RDF Plant Jakarta
                                             Bendungan Jragung Paket V                                               70                         13.800.404                      --                    1.664          4.510.144            18.312.212
WIKA - BRP                                    Kabupaten Semrang
WIKA GEDUNG - Adhi Karya                     KSO Pembangunan Hunian Pekerja Konstruksi (IKN) V                   60,00                          26.339.394                      --            (10.579.088)                   --           15.760.306
WIKA - BIT                                   Jalan Sumbu Timur IKN Tahap 2                                        70                                     --                     --              15.126.371                   --           15.126.371
WIKA - PT Sukses Putra Tanjung               Jalan Paket G di KIPP 1B-1C                                          70                            19.658.013                      --             (5.111.053)                   --           14.546.960
WIKA - CHINA CAMC - ADHI                     Bendungan Jenelata                                                  17,50                          14.381.611                      --             (3.608.252)           3.674.442            14.447.801
WIKA - Nindya - Waskita - MCC                Tol Cisumdawu Phase II                                               20                            14.000.000                      --                       --                  --           14.000.000
WIKA - Jaya Konstruksi                       Pembangunan Bendungan Cijurey Paket III                             70,00                          17.312.232                      --             (5.239.868)           (789.516)            11.282.849
WIKA - Rudy Jaya                             Pembangunan Bendungan Tiga Dihaji Paket IV                          95,00                          12.618.210                      --               (950.000)           (579.194)            11.089.017
                                              di Kab. OKU Selatan
WIKA - GKT                                   Jaringan Interkoneksi IPA Sepaku                                     70                                     --                     --               5.735.661           4.586.869            10.322.530
WIKA - BRP                                   Bendungan Jragung Paket II                                          70,00                           9.874.344                      --             (8.198.150)           8.334.485            10.010.678
WIKA GEDUNG - Nindya Karya                   KSO Venue PON Aceh                                                  55,00                          11.096.473                      --             (1.100.000)               (161)             9.996.312
WIKA - PP                                    Pembangunan Rumah Sakit Harapan Kita                                30,00                          10.763.658                      --            (10.676.263)           9.172.372             9.259.767
WIKA - GRIKSA                                Pembangunan RSUD Maba Halmahera Timur                               97,00                          11.402.715                      --             (3.000.000)               6.669             8.409.384
WIKA - HK - PP                               Bendungan Karangnongko Paket 1                                      40,00                          16.622.124                      --            (12.593.351)           1.057.321             5.086.094
WIKA - Minarta Dutahutama - Karta Utama                                                                          70,00                          11.351.767                      --            (10.500.000)                   --              851.767
Karyamarga                                  Banjir Kencing Drain Kudus
Lain-lain (masing-masing di bawah Rp10,000,000)/Others (each below Rp10,000,000 )                                                              127.496.333                      --           (34.028.589)           66.488.534           159.956.278
Subtotal                                                                                                                                     8.091.907.388                       -          (527.260.004)        (387.261.982)         7.196.772.601

Dikurangi / Less : Cadangan Kerugian Penurunan Nilai / Allowance for Impairment Loss                                                           (15.220.776)                                   12.847.808                                  (2.372.968)
Total                                                                                                                                        8.076.686.612                       -          (514.412.196)        (387.261.982)         7.194.399.632


                                                                                                              2025
        Nama Ventura Bersama/                                   Nama Proyek/                     Porsi Bagi      Nilai Tercatat                 Reklasifikasi/                Penambahan               Bagian Laba (Rugi)          Nilai Tercatat
        Name of Joint Venture                                  Name of Project                     Hasil/         Awal Tahun/                  Reclassification              (Pengurangan)/             Tahun Berjalan/            Akhir Tahun/
                                                                                                 Portion of     Carrying Value                                                   Addition                Income (Loss)            Carrying Value
                                                                                                  Shares       Beginning Balance                                               (Deduction)                 Portion in             Ending Balance
                                                                                                                                                                                                          Current Year
                                                                                                    (%)                     Rp                        Rp                             Rp                        Rp                       Rp

WIKA - CRIC - CRDC - CREC - CRSC            High Speed Railway Jakarta Bandung                     30,00                   5.487.317.749                           --                (570.000.000)                         --          4.917.317.749
PT Pilar Sinergi BUMN Indonesia             Transportasi, perdagangan, jasa industri,              33,36                   2.930.446.257                           --                           --            (1.663.707.405)          1.266.738.852
                                             pembangunan, perkebunan dan pertanian/
                                             Transportation, trade, service industry,
                                             construction, plantation and agriculture
PP - WIKA                                   Toll Road Development of Semarang-Demak                20,00                     234.339.614                           --                 (49.932.123)                38.935.626             223.343.117
                                             1B (VGF)
WG - Mutiara Masyur                         Apartemen Prospero                                     60,00                     183.429.576                           --                      568.807                   113.640             184.112.023
SRBGC - WIKA - Adhi Karya                   Jalan Tol Serang Panimbang Seksi III                   55,00                     199.538.877                           --                 (87.038.455)                31.382.408             143.882.830
WIKA - PP - KMK - HKI                       Tol Japek Selatan 2A                                   45,00                     366.181.720                           --                (269.675.730)                40.680.649             137.186.639
WIKA-PENTA-Ocean Construction               Pelabuhan Patimban Paket                               13,00                     139.070.108                           --                 (43.532.287)                20.722.304             116.260.125
 Co.,Ltd- Toyo Construction Co., Ltd-
 PP - PT Rinkai Nissan Construction
 Co.Ltd - JAKON
WIKA - PP                                   Jasa Kontraktor Engineering, Procurement, and          40,00                      10.515.975                           --                 (23.924.990)               123.055.484             109.646.469
                                             Construction (EPC) untuk Pengembangan Coal
                                             Handling Facility (CHF), Rail Loop, serta TLS 6
                                             (T4) dan TLS 7 (T5)
WIKA - Adhi Karya                           Tol Patimban 4                                         52,00                      11.559.478                           --                   77.327.196                13.621.938             102.508.612
WIKA - Waskita - PP                         Tol Probolinggo-Banyuwangi Paket 3                     25,00                      88.063.613                           --                 (61.554.482)                25.103.726              51.612.857
WIKA - Obayashi Corporation - JAKON -       Jakarta Sewerage 1                                     19,00                      24.336.149                           --                            --               26.030.782              50.366.931
 JFE Engineering Corporation
WIKA -Jaya Konstruksi                       SPAM Jatiluhur 1                                       80,00                     103.864.623                           --                 (63.840.638)                 9.276.238              49.300.223
WIKA - Bumi Karsa                           Bendungan Lau Simeme Paket I (MYC)                     65,00                      54.718.190                           --                 (24.474.755)                19.019.140              49.262.575
WIKA - Bina Nusa Lestari                    Irigasi Rentang Package LSS-07                         60,00                      44.722.206                           --                    1.749.579                   155.429              46.627.214
Kumagai - WIKA - Jaya Konstruksi            JSS Paket 3                                            60,00                      30.438.512                           --                    3.839.272                11.039.388              45.317.172
WIKA - Waskita Karya - Daelim               Karian Multipurporse DAM                               27,00                      26.589.785                           --                       15.108                10.744.733              37.349.626
WG - Mahoni Citra                           Tamansari Mahogany Konstruksi                          60,00                      36.948.616                           --                            --                        --             36.948.616
WIKA - Waskita - JAKON - PP                 Pembangunan Jalan Tol IKN Seksi 3B-2: Segmen KKT       45,00                      65.287.446                           --                 (31.926.550)                 2.137.907              35.498.803
                                            Kariangau - Sp. Tempadung
WIKA - Aluphi Hijau Lumina                  Fuel Fam Depot Dhoho Airport                           70,00                      18.521.226                           --                  (2.505.117)                11.517.399              27.533.508
WG - Adhi Karya                             KSO Pembangunan Hunian Pekerja Konstruksi              60,00                      26.339.394                           --                           --                         --             26.339.394
                                              (IKN) V
PP - WIKA - Nindya Karya - Adhi Karya       Pekerjaan Pembangunan Jalan Tol IKN                    20,00                          740.017                          --                  (3.953.051)                27.611.182              24.398.148
                                              Seksi 1B Segmen Bandara Sepinggan –
                                              Tol Balsam
Kumagai - WIKA - Jaya Konstruksi            JSS Paket 2                                            60,00                      12.043.778                           --                    6.374.549                  5.350.000             23.768.327
WIKA - Jaya Konstruksi                      Pekerjaan Konstruksi Terintegrasi Rancang dan          60,00                      53.338.609                           --                 (12.103.710)               (19.162.073)             22.072.826
                                              Bangun Pembangunan RDF Plant Jakarta
WIKA - PMJ                                  Peningkatan Jalan Kawasan Hankam                       70,00                         4.915.055                         --                 (20.002.635)                36.089.878              21.002.298
                                              dan Lingkar Sepaku 4
WIKA - Basuki                               Bendungan Sukamahi                                     55,00                      20.808.012                           --                            --                        --             20.808.012
WIKA - DMT                                  Pembangunan Bendungan Pamukkulu                        55,00                      59.277.403                           --                 (39.351.690)                         --             19.925.713
WIKA - SPT                                  Peningkatan Jalan Paket G di KIPP 1B-1C                70,00                               --                          --                            --               19.658.013              19.658.013
WIKA - Jaya Konstruksi                      Pembangunan Bendungan Cijurey Paket III                70,00                       9.421.008                           --                      369.840                 7.521.384              17.312.232
WIKA - HK -PP                               Bendungan Karangnongko Paket 1                         40,00                       3.019.826                           --                   10.778.122                 2.824.175              16.622.124
WIKA - BIT                                  Sumbu Timur Lanjutan                                   70,00                      31.615.414                           --                 (17.430.061)                 2.107.820              16.293.173
WIKA - CHINA CAMC - Adhi Karya              Bendungan Jenelata                                     17,50                       5.004.467                           --                  (2.754.589)                12.131.733              14.381.611
WIKA - MCC - Nindya - Waskita               Tol Cisumdawu Phase II                                 20,00                      73.044.333                           --                 (59.044.333)                         --             14.000.000
 RNC - JAKON
WG - Pemprov DKI                            Pembangunan Sekolah 1                                  98,00                     121.259.675                           --                     (539.774)            (106.791.287)              13.928.614
                                            Bendungan Jragung Paket V                              60,00                               --                          --                       181.121               13.619.283              13.800.404
WIKA - BRP                                   Kabupaten Semarang
WIKA - DMP - WBE                            Jalan Sp. Goro-Muri                                    55,00                      13.020.842                           --                           --                         --             13.020.842
WIKA - Rudy Jaya                            Pembangunan Bendungan Tiga Dihaji Paket IV             95.00                       3.856.507                           --                  (3.161.831)                11.923.535              12.618.211
                                             di Kab. OKU Selatan
WIKA - Griksa                               Pembangunan RSUD Maba Halmahera Timur                  97,00                               --                          --                  (1.000.000)                12.402.715              11.402.715
WIKA-Minarta Dutahutama-                    Banjir Kencing Drain Kudus                             70,00                      21.850.138                           --                 (10.863.640)                   365.270              11.351.768
 Karta Utama Karyamarga
WG - Nindya Karya                           KSO Venue PON Aceh                                     55,00                      28.092.123                           --                 (16.996.452)                        801             11.096.472
WIKA - PP                                   Pembangunan Rumah Sakit Harapan Kita                   30,00                         423.212                           --                  (2.912.161)                13.252.607              10.763.658
WIKA - Jaya Konstruksi                      Bendungan Cipanas Paket 3                              70,00                      24.690.380                           --                 (14.700.000)                          --             9.990.380
WIKA - BRP                                  Bendungan Jragung Paket II                             70,00                      16.638.044                           --                 (10.513.700)                  3.750.000              9.874.344
WIKA - Jaya Konstruksi                      Pembangunan Stasiun Pompa Ancol Sentiong               70,00                      14.189.851                           --                  (5.600.000)                          --             8.589.851
WIKA - PNFM                                 Dredging Tursina                                       70,00                      13.803.908                           --                  (3.668.767)                (1.593.052)              8.542.089
WIKA - DMT                                  Pembangunan Bendungan Kuwil Kawangkoan,                34,00                      10.531.734                           --                  (2.080.728)                          --             8.451.006
                                             Minahasa Paket III
WIKA - PP - JAKON                           Jalan Tol IKN Segmen KKT Kariangau-                    42.00                     112.552.984                           --                (105.260.030)                          --               7.292.954
                                             Sp. Tempadung
WIKA - Ananda                               Pembangunan Bendung Karet Sungai Juana                 70,00                      11.839.241                           --                  (4.709.168)                         11                7.130.084
WIKA - DMT - Barata                         Pembangunan Bendungan Sadawarna Paket I                70,00                      11.652.081                           --                  (5.600.000)                          --               6.052.081
WIKA - Barata                               Revitalisasi PG Rendeng Kudus                          70,00                      23.648.575                           --                  (3.000.000)               (15.409.121)                5.239.454
WIKA - PP                                   RS PON                                                 70,00                      52.257.081                           --                 (47.702.031)                          --               4.555.050
WIKA - Gemilang                             JDU SPAM Wosusokas 2                                   70,00                      46.338.555                           --                 (42.683.942)                    456.266                4.110.879
WG - Pemprov DKI                            Pembangunan Sekolah 5                                  98,00                      98.266.054                           --                  (1.550.135)               (94.937.109)                1.778.810
WIKA - Jaya Konstruksi                      Pembangunan Bendungan Cipanas Paket 1                  75,00                      10.374.765                           --                  (9.337.138)                          --               1.037.627
WIKA - Putra - Agung                        Pembangunan Bendungan Ameroro Kabupaten                65,00                      63.832.358                           --                 (63.832.358)                          --                       --
                                             Konawe Provinsi Sulawesi Tenggara Paket 1
WG - Pemprov DKI                            Pembangunan Sekolah 2                                  98,00                      47.260.757               (47.260.757)                             --                          --                       --
WIKA - Vicente T. Lao                       Construction of Clarins Bridge-Philippines             40,00                      31.355.699                         --                   (31.355.699)                          --                       --
WIKA - PP                                   Bandara BIJB                                           55,00                      28.087.335               (28.087.335)                             --                          --                       --
WIKA - HK - Brantas Abipraya                Tol Bayung Lencir - Tempino Seksi 3                    25,00                      27.754.166                         --                   (27.754.166)                          --                       --
WIKON - Ferrymadona Jaya -Yodya             Bangunan Sekolah DKI                                   85,00                      25.926.597                         --                   (25.926.597)                          --                       --
 Karya
WIKA - PP                                 Proyek IKN Istana Negara                                 45,00                      22.908.683                         --                (22.908.683)                             --                     --
WIKA - Persada                            Waduk 230 L Dtk Waduk Tembesi                            70,00                      13.934.753                         --                (13.934.891)                           138                      --
WIKA - PP                                 Kantor Presiden IKN                                      45,00                      13.531.621                         --                (13.531.621)                             --                     --
WIKA - Pandji                             Penggantian Jembatan Alalak                              70,00                      11.453.020                         --                (11.453.020)                             --                     --
Lain-lain (masing-masing di bawah Rp10,000,000)/ Others (each below Rp10,000,000 )                                           156.850.674                         --               (192.991.274)                    60.024.883             23.884.283
Subtotal                                                                                                                  11.433.638.449               (75.348.092)             (1.977.409.408)               (1.288.973.562)          8.091.907.388

Dikurangi / Less : Cadangan Kerugian Penurunan Nilai / Allowance for Impairment Loss                                         (44.684.612)                        --                  29.463.836                            --            (15.220.776)
Total                                                                                                                     11.388.953.837               (75.348.092)             (1.947.945.572)               (1.288.973.562)          8.076.686.612


                                                                                                              84

Page 94
PT WIJAYA KARYA (PERSERO) Tbk                                                                                                                        PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                                                                                  AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                                                                               NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                                                                                           FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                                                                                              For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                                                                                       June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                                                                                                     And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                                                                                                    Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                                                                                                  (In Thousand Rupiah, unless Otherwise Stated)
18.b Utang kepada Ventura Bersama                                                                                                                                                   18.b Joint Venture Payable
                                                                                                                  2026
         Nama Ventura Bersama/                                        Nama Proyek/                                 Porsi Bagi           Nilai Tercatat         Reklasifikasi/           Penambahan          Bagian Laba (Rugi)       Nilai Tercatat
         Name of Joint Venture                                       Name of Project                                 Hasil/              Awal Tahun/          Reclassification         (Pengurangan)/        Tahun Berjalan/         Akhir Tahun/
                                                                                                                   Portion of          Carrying Value                                      Addition           Income (Loss)         Carrying Value
                                                                                                                    Shares            Beginning Balance                                  (Deduction)            Portion in          Ending Balance
                                                                                                                                                                                                               Current Year
                                                                                                                         (%)                  Rp                      Rp                      Rp                    Rp                    Rp

WIKA - PP                                   Bandara BIJB JO                                                          55,00                     (77.488.283)                    --              (515.625)                      --          (76.972.658)
WIKA - WIKA GEDUNG - Nindya                 Gedung DPR II IKN                                                        50,00                    (150.000.000)                    --             95.471.045                      --          (54.528.955)
WIKA - WIKA GEDUNG - PT Cipta Mandiri       Rehab Total Gedung Sekolah Paket 1 Jakarta Utara dan Kepulauan                                     (30.015.532)                    --              (288.101)                      --
                                                                                                                     98,00                                                                                                                (29.727.431)
Perencana                                   Seribu
WIKA - PP                                   Gedung Financial Mandiri PIK                                             40,00                     (13.605.663)                    --            (13.500.000)                   --            (27.105.663)
WIKA GEDUNG - Brantas Abipraya              Gereja Basilika                                                          60,00                      (8.090.316)                    --            (12.474.890)                   --            (20.565.206)
WIKA - WIKA GEDUNG - PT Cipta Sentosa       Sekolah Rakyat Kalbar                                                    15,00                     (15.000.000)                    --              13.216.133                   --             (1.783.867)
Lain-lain (masing-masing di bawah Rp10,000,000)/Others (each below Rp10,000,000)                                                               (24.933.537)                    --            (40.943.827)          (7.013.608)            (71.986.736)
Total                                                                                                                                         (319.133.331)                    --             40.964.736           (7.013.608)           (282.670.515)



                                                                                                                  2025
        Nama Ventura Bersama/                                Nama Proyek/                          Porsi Bagi        Nilai Tercatat             Reklasifikasi/               Penambahan              Bagian Laba (Rugi)             Nilai Tercatat
        Name of Joint Venture                               Name of Project                          Hasil/           Awal Tahun/              Reclassification             (Pengurangan)/            Tahun Berjalan/               Akhir Tahun/
                                                                                                   Portion of       Carrying Value                                              Addition               Income (Loss)               Carrying Value
                                                                                                    Shares         Beginning Balance                                          (Deduction)                Portion in                Ending Balance
                                                                                                                                                                                                        Current Year
                                                                                                          (%)                  Rp                     Rp                            Rp                       Rp                          Rp

WIKA-PP                                   Proyek IKN Istana Negara                                    45,00                    (22.567.390)                      --                    22.567.390                        --                        --
WIKA - PP                                 RS PON                                                      70,00                    (47.500.000)                      --                    47.500.000                        --                        --
WG-Pemprov DKI                            Pembangunan Sekolah 2                                       98,00                              --             47.260.757                    (1.243.024)              (48.251.776)               (2.234.043)
WIKA - PP                                 Gedung Financial Mandiri PIK                                40,00                              --                      --                  (13.605.662)                        --              (13.605.662)
WIKA - WIKA Gedung - PT Cipta Sentosa Sekolah Rakyat Kalimantan Barat                                 60,00                              --                      --                  (15.000.000)                        --              (15.000.000)
WIKA-PP                                   Bandara BIJB                                                55,00                              --             28.087.335                              --            (105.575.618)              (77.488.283)
WIKA - WIKA Gedung - Nindya Karya         Gedung DPR II IKN                                           65,00                              --                      --                 (150.000.000)                        --             (150.000.000)
Lain-lain (masing-masing di bawah Rp10,000,000)/ Others (each below Rp 10,000,000)                                             (14.696.401)                      --                   (1.294.683)                  (12.947)              (16.004.031)

Total                                                                                                                          (84.763.791)             75.348.092                  (111.075.979)             (153.840.341)             (274.332.019)




KSO WIKA-CRIC-CRDC-CREC-CRSC                                                                                              KSO WIKA-CRIC-CRDC-CREC-CRSC
Pada tanggal 31 Desember 2024, Perusahaan                                                                                 On December 31, 2024, the Company registered a
mendaftarkan klaim PDPK KSO WIKA-CRIC-CRDC-                                                                               claim for PDPK KSO WIKA-CRIC-CRDC-CREC-
CREC-CRSC atas proyek High Speed Railway                                                                                  CRSC for the Jakarta Bandung High Speed Railway
Jakarta Bandung milik PT Kereta Cepat Indonesia                                                                           project owned by PT Kereta Cepat Indonesia China
China      (KCIC,    pihak     berelasi)      sebesar                                                                     (KCIC,      a    related    party)    amounting     to
Rp5.019.142.049 yang merupakan klaim atas cost                                                                            Rp5,019,142,049 which is a claim for cost overrun
overrun ke Singapore International Arbitration Centre                                                                     filed with the Singapore International Arbitration
(SIAC). Pada tanggal 30 Januari 2026, Perseroan                                                                           Centre (SIAC). On January 30, 2026, the Company
dan KCIC mengajukan permohonan mediasi dalam                                                                              and KCIC submitted a request for mediation in order
rangka penyelesaian perselisihan tersebut ke Jaksa                                                                        to resolve the dispute to the Deputy Attorney General
Agung Muda Perdata dan Tata Usaha Negara                                                                                  for Civil and State Administrative Affairs (Jamdatun).
(Jamdatun). Hingga laporan keuangan konsolidasian                                                                         Until the consolidated financial statements were
diterbitkan, belum ada tanggapan dari Jamdatun                                                                            published, there has been no response from
terkait permohonan yang diajukan Perusahaan dan                                                                           Jamdatun regarding the request submitted by the
proses di SIAC masih disuspensi.                                                                                          Company and the process at SIAC is still suspended.

PT Pilar Sinergi BUMN Indonesia (“PSBI”)                                                                                  PT Pilar Sinergi BUMN Indonesia (“PSBI”)
Berdasarkan Akta Pernyataan Keputusan Para                                                                                Based on the Deed of Decision Statement of the
Pemegang Saham PSBI No. 45 tanggal 10                                                                                     Shareholders of PSBI No. 45 dated December 10,
Desember 2024 dari Notaris Mala Mukti S.H., LL.M.,                                                                        2024, from Notary Mala Mukti S.H., LL.M., PSBI
PSBI menerbitkan saham baru sejumlah 2.697.142                                                                            issued new shares amounting to 2,697,142 shares
lembar saham sebesar Rp2.697.142.000 yang                                                                                 valued at Rp2,697,142,000, which were fully
diambil seluruhnya oleh PT Kereta Api Indonesia                                                                           subscribed by PT Kereta Api Indonesia (Persero).
(Persero). Atas transaksi ini persentase kepemilikan                                                                      Due to this transaction the Company’s percentage of
Perusahaan di PSBI terdilusi dari 39,12% menjadi                                                                          ownership in PSBI diluted from 39.12% to 33.36%.
33,36%.

19.         Properti Investasi - Neto                                                                                                                                 19. Investment Properties - Net
                                                                                                                  2026
                                                      Saldo Awal/                Penambahan/                  Reklasifikasi/              Kenaikan                     Saldo Akhir/
                                                      Beginning                    Addition                  Reclassification         (Penurunan) Nilai                  Ending
                                                       Balance                                                                         Wajar/ Increase                  Balance
                                                                                                                                        (Decrease) in
                                                                                                                                          Fair Value
                                                             Rp                          Rp                        Rp                         Rp                               Rp
Diukur pada Nilai Wajar                                                                                                                                                                                         Measured at Fair Value
 Tanah                                                    504.631.401                                --                    --                                 --             504.631.401                                            Land
 Bangunan dan Prasarana                                 1.024.506.350                                --          (67.251.000)                                 --             957.255.350                      Building and Infrastructure
Total                                                   1.529.137.751                                --          (67.251.000)                                 --           1.461.886.751                                             Total

                                                                                                                  85

Page 95
PT WIJAYA KARYA (PERSERO) Tbk                                                                                                             PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                                                                       AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                                                                    NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                                                                                FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                                                                                  For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                                                                           June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                                                                                         And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                                                                                        Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                                                                                      (In Thousand Rupiah, unless Otherwise Stated)
                                                                                                    2025
                                         Saldo Awal/                Penambahan/                 Reklasifikasi/                Kenaikan                   Saldo Akhir/
                                         Beginning                    Addition                 Reclassification           (Penurunan) Nilai                Ending
                                          Balance                                                                          Wajar/ Increase                Balance
                                                                                                                            (Decrease) in
                                                                                                                              Fair Value
                                               Rp                            Rp                          Rp                       Rp                             Rp
Diukur pada Nilai Wajar                                                                                                                                                                       Measured at Fair Value
 Tanah                                       385.329.807                                  --          110.306.080                   8.995.514                504.631.401                                          Land
 Bangunan dan Prasarana                      934.638.274                                  --          686.594.188               (596.726.112)              1.024.506.350                    Building and Infrastructure
Total                                      1.319.968.081                                  --          796.900.268               (587.730.598)              1.529.137.751                                           Total



Properti investasi Perusahaan berupa tanah, yang                                                               The Company's investment properties are land,
berlokasi di Bali, Surabaya, Samarinda dan                                                                     which are located in Bali, Surabaya, Samarinda and
Balikpapan. Sedangkan Bangunan Grup berlokasi di                                                               Balikpapan. While the Group’s buildings are located
Jakarta, Tangerang, Karawang, Bandung, dan                                                                     in Jakarta, Tangerang, Karawang, Bandung and
Surabaya yang merupakan area komersial, kondotel                                                               Surabaya, which are commercial areas, condotels
dan ruko.                                                                                                      and commercial buildings.

Pada tahun 2025, WIKA Realty mereklasifikasi tanah                                                             In 2025, WIKA Realty reclassified the Tamansari
dan bangunan Tamansari Gangga menjadi properti                                                                 Gangga land and buildings as investment properties
investasi masing-masing sebesar Rp110.306.080                                                                  amounting to Rp110,306,080 and Rp686,594,188,
dan Rp686.594.188 (Catatan 11).                                                                                respectively (Note 11).

Berikut adalah nama Penilai, dan tanggal laporan                                                               The following are the names of the Valuer, and the
penilaian atas perhitungan nilai wajar beberapa                                                                dates of the appraisal report on the calculation of the
properti investasi pada 31 Desember 2025:                                                                      fair value of some investment properties as of
                                                                                                               December 31, 2025:
               Nama Penilai /                        Partner/                              Tanggal Laporan /            Tanggal Penilaian /         Entitas /                     Objek /                   Nilai Wajar/
               Name of Valuer                        Partner                                 Report date                  Valuation date            Entities                      Object                    Fair Value

KJPP Karmanto dan Rekan         Setyo Budi Legowo,STP., MAPPI (Cert )                 17 Sept 2025/ Sept 17, 2025   30 Juni 2025/ June 30, 2025    Perusahaan/   Tanah Tabanan Bali/                            100.435.000
                                                                                                                                                  The Company    Land Tabanan Bali
KJPP Karmanto dan Rekan         Setyo Budi Legowo,STP., MAPPI (Cert)                  17 Sept 2025/ Sept 17, 2025   30 Juni 2025/ June 30, 2025    Perusahaan/   Space Office Tamansari Papilio Surabaya/         12.931.000
                                                                                                                                                  The Company
KJPP Karmanto dan Rekan         Setyo Budi Legowo,STP., MAPPI (Cert)                  17 Sept 2025/ Sept 17, 2025   30 Juni 2025/ June 30, 2025    Perusahaan/   Kantor dan Mess ex Bitumen Makassar/             14.788.000
                                                                                                                                                  The Company    Office and Mess ex Bitumen Makassar
KJPP Karmanto dan Rekan         Setyo Budi Legowo,STP., MAPPI (Cert)                  17 Sept 2025/ Sept 17, 2025   30 Juni 2025/ June 30, 2025    Perusahaan/   Ruko Ex. DSU 2 - Sidoarjo No. 38/                   873.000
                                                                                                                                                  The Company    Shophouse Ex. DSU 2 - Sidoarjo No. 38
KJPP Karmanto dan Rekan         Setyo Budi Legowo,STP., MAPPI (Cert)                  17 Sept 2025/ Sept 17, 2025   30 Juni 2025/ June 30, 2025    Perusahaan/   Ruko Ex. DSU 2 - Sidoarjo No. 39/                   873.000
                                                                                                                                                  The Company    Shophouse Ex. DSU 2 - Sidoarjo No. 39
Mushofah & Rekan                Mushofah, S.T.,MM, MAPPI (Cert)                       11 Sept 2025/ Sept 11, 2025   11 Sept 2025/ Sept 11, 2025   WIKA Gedung    Lahan Ngagel/ Land Ngagel                      170.114.875
Mushofah & Rekan                Mushofah, S.T.,MM, MAPPI (Cert)                       11 Sept 2025/ Sept 11, 2025   11 Sept 2025/ Sept 11, 2025   WIKA Gedung    Fave Hotel Karawang/ Fave Hotel Karawang        89.456.900
Toto Suharto dan Rekan          Hery Wahyudianto, S.T., MAPPI (Cert.)                 1 Sept 2025/ Sept 1, 2025     1 Sept 2025/ Sept 1, 2025      WIKA Beton    Unit Ruko di Bogor/                              4.544.000
                                                                                                                                                                 Shophouse Unit in Bogor
Toto Suharto dan Rekan          Hery Wahyudianto, S.T., MAPPI (Cert.)                 1 Sept 2025/ Sept 1, 2025     28 Agu 2025/ Aug 28, 2025     WIKA Beton     Tanah Kosong/ Vacant Land                         1.097.088
Toto Suharto dan Rekan          Hery Wahyudianto, S.T., MAPPI (Cert.)                 1 Sept 2025/ Sept 1, 2025     28 Agu 2025/ Aug 28, 2025     WIKA Beton     Unit Kantor Tamansari Hive Office/                1.188.512
                                                                                                                                                                 Tamansari Hive Office Unit
Toto Suharto dan Rekan          Hery Wahyudianto, S.T., MAPPI (Cert.)                 1 Sept 2025/ Sept 1, 2025     28 Agu 2025/ Aug 28, 2025     WIKA Beton     Unit Apartemen The Wave/                         67.251.000
                                                                                                                                                                 The Wave Apartment Unit
Toto Suharto dan Rekan          Hery Wahyudianto, S.T., MAPPI (Cert.)                 1 Sept 2025/ Sept 1, 2025     28 Agu 2025/ Aug 28, 2025     WIKA Beton     Tanah Kosong Tegal/ Vacant Land in Tegal         12.456.000
Toto Suharto dan Rekan          Hery Wahyudianto, S.T., MAPPI (Cert.)                 1 Sept 2025/ Sept 1, 2025     28 Agu 2025/ Aug 28, 2025     WIKA Beton     Tanah Kosong di Semarang/                         1.320.000
                                                                                                                                                                 Vacant Land in Semarang
Toto Suharto dan Rekan          Hery Wahyudianto, S.T., MAPPI (Cert.)                 1 Sept 2025/ Sept 1, 2025     28 Agu 2025/ Aug 28, 2025     WIKA Beton     Tanah Kosong di Bengkulu/                        31.383.536
                                                                                                                                                                 Vacant Land in Bengkulu
Toto Suharto dan Rekan          Hery Wahyudianto, S.T., MAPPI (Cert.)                 1 Sept 2025/ Sept 1, 2025     28 Agu 2025/ Aug 28, 2025     WIKA Beton     Bangunan di Bengkulu/                            11.677.064
                                                                                                                                                                 Building in Bengkulu
Toto Suharto dan Rekan          Hery Wahyudianto, S.T., MAPPI (Cert.)                 1 Sept 2025/ Sept 1, 2025     28 Agu 2025/ Aug 28, 2025        WPG         Unit Ruko Pasar Bogor/                            2.671.400
                                                                                                                                                                 Shophouse Unit Pasar Bogor
Toto Suharto dan Rekan          Hery Wahyudianto, S.T., MAPPI (Cert.)                 1 Sept 2025/ Sept 1, 2025     28 Agu 2025/ Aug 28, 2025        Kraton      Tanah Kosong di Cilegon/                         60.552.576
                                                                                                                                                                 Vacant Land in Cilegon
Karmanto & Rekan                Setyo Budi Legowo, STP., MAPPI (Cert)                 17 Sept 2025/ Sept 17, 2025   30 Juni 2025/ June 30, 2025   WIKA Realty    Tamansari Hive                                 183.423.000
Karmanto & Rekan                Setyo Budi Legowo, STP., MAPPI (Cert)                 17 Sept 2025/ Sept 17, 2025   30 Juni 2025/ June 30, 2025   WIKA Realty    Tamansari Skylounge Tangerang (Kyriad)          89.777.000
Karmanto & Rekan                Setyo Budi Legowo, STP., MAPPI (Cert)                 17 Sept 2025/ Sept 17, 2025   30 Juni 2025/ June 30, 2025   WIKA Realty    Tamansari Hive Office                           19.084.000
Karmanto & Rekan                Setyo Budi Legowo, STP., MAPPI (Cert)                 17 Sept 2025/ Sept 17, 2025   30 Juni 2025/ June 30, 2025   WIKA Realty    Tamansari Semanggi Apartemen                    83.916.000
Karmanto & Rekan                Setyo Budi Legowo, STP., MAPPI (Cert)                 17 Sept 2025/ Sept 17, 2025   30 Juni 2025/ June 30, 2025   WIKA Realty    Hotel BW De Papilio                             40.605.000
Karmanto & Rekan                Setyo Budi Legowo, STP., MAPPI (Cert)                 17 Sept 2025/ Sept 17, 2025   30 Juni 2025/ June 30, 2025   WIKA Realty    Sportclub Tamansari Pesona Bali                  1.664.000
Karmanto & Rekan                Setyo Budi Legowo, STP., MAPPI (Cert)                 17 Sept 2025/ Sept 17, 2025   30 Juni 2025/ June 30, 2025   WIKA Realty    Hotel BW La Grande                              54.839.000
Doli Siregar & Rekan            Achmad Faisal Siregar, BA., M.Ec.Dev., MAPPI (Cert)   23 Sept 2024/ Sept 23, 2024   30 Sept 2024/ Sept 30, 2024   WIKA Realty    Sudirman Suites Residence                      282.136.800
Karmanto & Rekan                Setyo Budi Legowo, STP., MAPPI (Cert)                 17 Sept 2025/ Sept 17, 2025   30 Juni 2025/ June 30, 2025   WIKA Realty    Sportclub The HillsTamansari Semarang           16.525.000
Karmanto & Rekan                Setyo Budi Legowo, STP., MAPPI (Cert)                 27 Feb 2026/ Feb 27, 2026     30 Nov 2025/ Nov 30, 2025     WIKA Realty    Tamansari Gangga Tabanan Bali                  173.555.000
                                                                                                                                                                                                              1.529.137.751




Pendekatan yang digunakan dalam menentukan nilai                                                               Approach that is used in determining the fair value of
wajar properti tanah adalah pendekatan pasar.                                                                  land property is the market approach.

Pendekatan yang digunakan dalam menentukan nilai                                                               Approaches that are used in determining the fair
wajar properti tanah dan bangunan adalah                                                                       value of land and buildings properties are the
pendekatan pendapatan, pendekatan biaya, dan                                                                   income approach, the cost approach, and the market
pendekatan pasar.                                                                                              approach.


                                                                                                        86

Page 96
PT WIJAYA KARYA (PERSERO) Tbk                                                                      PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                                AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                             NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                                         FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                                            For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                                     June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                                                   And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                                                  Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                                                (In Thousand Rupiah, unless Otherwise Stated)
Kenaikan nilai wajar untuk tahun yang berakhir pada                             Increase in fair value for the year ended Junel 30,
30 Juni 2026 dan 31 Desember 2025 masing-masing                                 2026 and December 31, 2025 amounting to nil and
sebesar nihil dan Rp587.730.598 yang timbul dari                                Rp587,730,598, respectively, arising from changes
perubahan nilai wajar properti investasi Grup, dicatat                          in the fair value of the Group's investment
pada selisih nilai wajar properti investasi pada                                properties, is recorded as the difference between the
penghasilan dan beban lain-lain (Catatan 48).                                   fair value of investment properties in other income
                                                                                and other expenses (Note 48).

Pendapatan sewa dan beban operasi langsung dari                                 Rental income and direct operating expenses from
properti investasi pada laporan laba rugi dan                                   investment property recognized in the consolidated
penghasilan komprehensif lain konsolidasian adalah                              statements of profit or loss and other comprehensive
sebagai berikut:                                                                income are as follows:

                                                            2026                          2025
                                                             Rp                            Rp

Pendapatan sewa                                              21.694.959                     24.838.561                                      Rental Income
Beban pokok pendapatan                                       (8.925.608)                  (11.686.226)                                    Cost of revenues

20.      Aset Tetap - Neto                                                                                                  20. Fixed Assets - Net
                                                                         2026
                                Saldo Awal/        Penambahan/        Pengurangan/         Reklasifikasi/         Saldo Akhir/
                                Beginning            Addition          Deduction          Reclassification          Ending
                                 Balance                                                                           Balance
                                    Rp                 Rp                  Rp                    Rp                   Rp
Nilai Tercatat                                                                                                                                    Acquisition Cost
Pemilikan Langsung                                                                                                                               Direct Ownership
  Hak atas Tanah                  2.606.409.096                  --                  --               225.000       2.606.634.096                       Landrights
  Lahan Tambang                      60.329.605                  --                  --                     --         60.329.605                          Quarry
  Bangunan                        1.490.457.974                  --                  --            67.251.000       1.557.708.974                        Buildings
  Prasarana                         566.918.588                  --            (72.262)                     --        566.846.326                  Infrastructures
  Perlengkapan Kantor               157.928.575            756.850                   --             5.251.232         163.936.657               Office Equipment
  Peralatan Pabrik dan Proyek     3.706.296.869                  --         (4.107.300)          (29.708.090)       3.672.481.479    Project and Plant Equipment
  Kendaraan                           8.684.131                  --                  --                     --          8.684.131                         Vehicles
  Aset dalam Penyelesaian            52.712.585          3.312.352                   --           (7.708.796)          48.316.140              Assets in Progress
                                  8.649.737.423          4.069.202          (4.179.562)            35.310.345       8.684.937.408

Akumulasi Penyusutan                                                                                                                   Accumulated Depreciation
Pemilikan Langsung                                                                                                                               Direct Ownership
  Lahan Tambang                      11.777.500                  --                  --                    --          11.777.500                          Quarry
  Bangunan                          545.792.735         31.438.101                   --                    --         577.230.836                        Buildings
  Prasarana                         343.148.067         10.977.985             (37.335)                    --         354.088.717                  Infrastructures
  Perlengkapan Kantor               130.738.279          8.124.548                   --                    --         138.862.827               Office Equipment
  Peralatan Pabrik dan Proyek     2.566.689.914         66.585.770          (3.562.141)          (26.218.888)       2.603.494.655    Project and Plant Equipment
  Kendaraan                           8.527.695             77.934                   --                    --           8.605.629                        Vehicles
                                  3.606.674.190        117.204.338          (3.599.476)          (26.218.888)       3.694.060.164

Nilai Buku                        5.043.063.233                                                                     4.990.877.244                     Book Value


                                                                         2025
                                Saldo Awal/        Penambahan/        Pengurangan/         Reklasifikasi/         Saldo Akhir/
                                Beginning            Addition          Deduction          Reclassification          Ending
                                 Balance                                                                           Balance
                                    Rp                 Rp                  Rp                    Rp                   Rp
Nilai Tercatat                                                                                                                                    Acquisition Cost
Pemilikan Langsung                                                                                                                               Direct Ownership
  Hak atas Tanah                  2.606.728.505            166.872            (319.408)            (166.873)        2.606.409.096                       Landrights
  Lahan Tambang                      60.329.605                  --                  --                   --           60.329.605                          Quarry
  Bangunan                        1.548.741.458          2.020.655                   --         (60.304.139)        1.490.457.974                        Buildings
  Prasarana                         564.126.104          3.052.761                   --            (260.277)          566.918.588                  Infrastructures
  Perlengkapan Kantor               157.967.863          5.251.123                   --          (5.290.411)          157.928.575               Office Equipment
  Peralatan Pabrik dan Proyek     4.214.785.014          1.921.552         (97.644.815)        (412.764.882)        3.706.296.869    Project and Plant Equipment
  Kendaraan                          10.396.648             97.704                   --          (1.810.221)            8.684.131                         Vehicles
  Aset dalam Penyelesaian            46.657.143          6.726.772            (187.552)            (483.778)           52.712.585              Assets in Progress
                                  9.209.732.340         19.237.439         (98.151.775)        (481.080.581)        8.649.737.423

Akumulasi Penyusutan                                                                                                                   Accumulated Depreciation
Pemilikan Langsung                                                                                                                               Direct Ownership
  Lahan Tambang                      12.550.923                  --                  --            (773.423)           11.777.500                          Quarry
  Bangunan                          554.070.853         61.985.585                   --         (70.317.162)          545.739.276                        Buildings
  Prasarana                         320.852.649         22.480.791                   --            (185.373)          343.148.067                  Infrastructures
  Perlengkapan Kantor               115.202.191         17.153.115                   --          (1.617.027)          130.738.279               Office Equipment
  Peralatan Pabrik dan Proyek     2.867.713.968        148.198.220         (89.874.916)        (361.031.074)        2.565.006.198    Project and Plant Equipment
  Kendaraan                           8.894.347            154.400                   --            (521.052)            8.527.695                        Vehicles
                                  3.879.284.931        249.972.111         (89.874.916)        (434.445.111)        3.604.937.015

Penurunan Nilai                                                                                                                                         Impairment
  Bangunan                                    --           (53.459)                  --                      --           (53.459)                       Buildings
  Peralatan Pabrik dan Proyek                 --        (1.683.716)                  --                      --        (1.683.716)   Project and Plant Equipment
                                              --        (1.737.175)                  --                      --        (1.737.175)
Nilai Buku                        5.330.447.409                                                                     5.043.063.233                     Book Value




                                                                          87

Page 97
PT WIJAYA KARYA (PERSERO) Tbk                                                 PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                           AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                    FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                        For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                 June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                               And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                              Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                            (In Thousand Rupiah, unless Otherwise Stated)
Aset tetap digunakan untuk menunjang kegiatan                   Fixed assets are used to support the Group's
operasional Grup.                                               operational activities.

Beban penyusutan dan deplesi dialokasikan ke                    Depreciation and depletion expenses allocated to
beban pokok pendapatan dan beban administrasi                   cost of revenues and general and administrative
dan umum dengan rincian sebagai berikut:                        expenses, with the details are as follows:
                                              2026                     2025
                                               Rp                       Rp
Beban Pokok Pendapatan                                                                                 Cost of Revenues
  (Catatan 45)                                 109.001.856              117.599.316                          (Note 45)
Beban Umum dan Administrasi                                                                   General and Administrative
  (Catatan 47)                                   8.202.482                9.012.834               Expenses (Note 47)
                                               117.204.338              126.612.150

Pada tahun 2025, WIKA Bitumen mengakui                          In 2025, WIKA Bitumen recognized an impairment
penurunan nilai atas aset tetap berupa bangunan,                loss on property, plant and equipment consist of
mesin, dan peralatan dengan jumlah kerugian                     buildings, machinery, and equipment amounting to
sebesar Rp1.737.175 yang dicatat pada beban lain-               Rp1,737,175, which was recorded under other
lain (Catatan 48).                                              expenses (Note 48).

Pada tahun 2025, WIKA Bitumen melakukan                         In 2025, WIKA Bitumen derecognized a fixed asset
penghapusan aset tetap berupa tanah yang                        in the form of land located in Surabaya. The
berlokasi di Surabaya. Penghapusan tersebut                     derecognition was carried out in connection with the
dilakukan sehubungan dengan pengambilalihan aset                takeover of the asset by the Government of the City
oleh Pemerintah Kota Surabaya, mengingat tanah                  of Surabaya, as the land constituted property owned
tersebut merupakan barang milik Pemerintah Kota                 by the Government of the City of Surabaya. In
Surabaya. Sehubungan dengan transaksi tersebut,                 relation to this transaction, WIKA Bitumen
WIKA      Bitumen    mengakui       kerugian atas               recognized a loss on the disposal of the fixed asset
penghapusan aset tetap sebesar Rp319.408 yang                   amounted to Rp319,408, which was recorded under
dicatat pada Beban Lain-lain (Catatan 48).                      Other Expenses (Note 48).

Pada tahun 2025, WIKA IKON mereklasifikasi                      In 2025, WIKA IKON reclassified project and plant
peralatan pabrik dan proyek menjadi aset lancar lain-           equipment into other current asets with a net book
lain dengan nilai buku bersih sebesar Rp46.595.700              value amounting to Rp46,595,700 (Note 25) and
(Catatan 25) dan perlengkapan kantor menjadi aset               office equipment into intangible assets amounting to
takberwujud sebesar Rp195.632 (Catatan 24).                     Rp195,632 (Note 24).

Per 31 Desember 2025, Grup melakukan penjualan                  As of December 31, 2025, the Group sold fixed
aset tetap dengan harga jual sebesar Rp13.466.186               assets at a selling price of Rp13,466,186 with a net
dengan nilai buku bersih sebesar Rp7.957.451. Atas              book value of Rp7,957,451. From this asset sale
transaksi    penjualan    aset   ini, Perusahaan                transaction, the Group obtained a gain on the sale of
memperoleh keuntungan penjualan aset sebesar                    assets of Rp5,508,735 (Note 48).
Rp5.508.735 (Catatan 48).

Berdasarkan laporan penilai Independen yaitu KJPP               Based on the report of an independent appraiser,
Rizky Djunaedy dan Rekan, dengan KJPP Laporan                   namely KJPP Rizky Djunaedy and Partners, with
No.00322/2.0017-00/PP/03/0362/1/X/2024         pada             KJPP     Report    No.00322/2.0017-00/PP/03/0362/
tanggal 23 Oktober 2024 dengan pendekatan nilai                 1/X/2024 on October 23, 2024 with a market value
pasar sebesar Rp72.087.440 yang bertujuan untuk                 amounting to Rp72,087,440 approach which aims to
memberikan nilai pasar dan nilai likuidasi dari aset            provide market value and liquidation value of the
yang dinilai guna rencana penjualan aset, yaitu                 assets assessed for the asset sales plan, namely
mesin dan peralatan pabrik majalengka milik WIKA                Majalengka factory machinery and equipment owned
IKON dengan nilai buku sebesar Rp44.110.042 dan                 by WIKA IKON with book value of Rp44,110,042 and
penilaian pabrik fabrikasi baja dengan tanah seluas             the assessment of a steel fabrication factory with a
56.875 meter persegi dan bangunan 30.505 meter                  land area of 56,875 square meters and a building of

                                                           88

Page 98
PT WIJAYA KARYA (PERSERO) Tbk                                                 PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                           AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                    FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                        For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                 June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                               And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                              Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                            (In Thousand Rupiah, unless Otherwise Stated)
persegi yang terdiri dari 51 SHGB atas nama                     30,505 square meters consisting of 51 SHGB in the
Perusahaan        dengan       nilai   pasar    sebesar         name of the Company with a market value of
Rp228.075.062        dan       nilai   buku     sebesar         Rp228,075,062 and a book value of Rp223,796,124.
Rp223.796.124. Aset tetap yang tersedia untuk dijual            Fixed assets available forsale are reclassified to
direklasifikasi ke aset lain-lain (Catatan 25).                 other assets (Note 25).

Aset tetap Grup kecuali tanah diasuransikan                     Fixed assets except land of the Group are insured
terhadap risiko kebakaran dan risiko lainnya kepada             fire risk and other risks with PT Avrist General
PT Avrist General Insurance Tbk, PT Bringin                     Insurance Tbk, PT Bringin Sejahtera Makmur, PT
Sejahtera Makmur, PT Cahaya Solusi Cerdas, PT                   Cahaya Solusi Cerdas, PT Estika Jasa Tama, PT
Estika Jasa Tama, PT Rajawali Insurance, PT                     Rajawali Insurance, PT Asuransi Intra Asia, PT
Asuransi Intra Asia, PT Zurich Asuransi Indonesia               Zurich Asuransi Indonesia Tbk, PT Asuransi Wahana
Tbk, PT Asuransi Wahana Tata, PT Asuransi Chubb                 Tata, PT Asuransi Chubb Syariah Indonesia, PT
Syariah Indonesia, dan PT BRI Insurance dengan                  BRI Insurance, with insurance coverage as of June
nilai      pertanggungan         pada        tanggal            30, 2026 and December 31, 2025 amounting to
30 Juni 2026 dan 31 Desember 2025 masing-masing                 Rp1,352,243,997        and        Rp1,016,435,516,
sebesar Rp1.352.243.997 dan Rp1.016.435.516.                    respectively.

Manajemen berpendapat bahwa nilai pertanggungan                 Management believes that the insurance coverage is
tersebut cukup untuk menutupi kemungkinan                       adequate to cover possible losses on the fixed
kerugian atas aset tetap yang dipertanggungkan.                 assets insured.

Berdasarkan penelaahan manajemen pada akhir                     Based on management's evaluation at the end of the
tahun, tidak diperlukan penyisihan penurunan nilai              year, there is no provision for impairment on fixed
atas aset tetap milik Grup.                                     assets of the Group.

Aset tetap dalam pembangunan atas bangunan,                     Fixed assets under construction of buildings, project
peralatan proyek dan pabrik, dan prasarana                      and plant equipment, and infrastructure pertains to
merupakan pembangunan pabrik baru milik                         the construction of new factory of the Company,
Perusahaan, WIKA Realty, WIKA Beton, WIKA                       WIKA Realty, WIKA Beton, WIKA IKON and WIKA
IKON, dan WIKA Bitumen.                                         Bitumen.

Persentase penyelesaian aset tetap dalam                        Percentage completion of the Company’s fixed
pembangunan        Perusahaan     pada    tanggal               assets under construction as of Juni 30, 2026 with
30 Juni 2026 dengan progres sebesar 95%, adalah                 progress 95% are buildings that were estimated to
bangunan yang diestimasikan akan selesai pada 3                 be completed within 3 months. There are no
bulan. Tidak terdapat hambatan dalam penyelesaian               obstacles in completing the construction of the fixed
pembangunan aset tetap tersebut.                                assets.

Persentase penyelesaian aset tetap dalam                        The percentage of completion of fixed assets under
pembangunan      WIKA     Beton     pada    tanggal             construction WIKA Beton as of June 30, 2026
30 Juni 2026 antara lain perlengkapan kantor 97%,               includes office equipment 97%, land 84%, mine
tanah 84%, tambang 26%, bangunan 92%, dan                       26%, building 92% and plant equipment 68%, which
peralatan 68%, yang diestimasikan akan selesai                  is estimated to be completed in 12 (twelve) months.
pada 12 (dua belas) bulan. Tidak terdapat hambatan              There were no obstacles in           completing the
dalam penyelesaian pembangunan aset tetap                       construction of these fixed assets.
tersebut.
Persentase penyelesaian aset tetap dalam                        Percentage completion of WIKA IKON’s fixed assets
pembangunan     WIKA    IKON      pada    tanggal               under construction as of June 30, 2026 consists of
30 Juni 2026 dengan progres sebesar, antara lain                building 98.9%. There are no obstacles in completing
bangunan 98,9%. Tidak terdapat hambatan dalam                   the construction of the fixed assets.
penyelesaian pembangunan aset tetap tersebut.

Pada tanggal 30 Juni 2026 dan 31 Desember 2025,                 As of June 30, 2026 and December 31, 2025, the
Grup memiliki aset tetap yang telah disusutkan                  Group has property, plant and equipment with
penuh dan masih digunakan dengan harga                          acquisition cost that had been fully depreciated and
                                                           89

Page 99
PT WIJAYA KARYA (PERSERO) Tbk                                                              PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                        AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                     NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                                 FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                                     For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                              June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                                            And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                                           Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                                         (In Thousand Rupiah, unless Otherwise Stated)
perolehan masing-masing sebesar Rp367.395.888.                         still in use                  amounting          to     Rp367,395,888,
                                                                       respectively.

21.     Aset Kerja Sama Operasi                                                                         21. Assets of Joint Operation
                                                                 2026
                          Saldo Awal/     Penambahan/        Pengurangan/         Reklasifikasi/       Saldo Akhir/
                          Beginning         Addition          Deduction          Reclassification        Ending
                           Balance                                                                      Balance
                              Rp              Rp                  Rp                    Rp                 Rp
Harga Perolehan                                                                                                                      Acquisition Cost
 Bangunan                   462.983.670                 --     (155.775.012)                    --        307.208.659                        Building
Akumulasi Penyusutan                                                                                                         Accumulated Depreciation
 Bangunan                   217.072.528        6.096.087       (155.775.012)                    --         67.393.604                        Building
Total                       245.911.142                                                                   239.815.055                           Total


                                                                 2025
                          Saldo Awal/     Penambahan/        Pengurangan/         Reklasifikasi/       Saldo Akhir/
                          Beginning         Addition          Deduction          Reclassification        Ending
                           Balance                                                                      Balance
                              Rp              Rp                 Rp                    Rp                  Rp
Harga Perolehan                                                                                                                      Acquisition Cost
 Bangunan                   462.983.670                 --                  --                  --       462.983.670                         Building
Akumulasi Penyusutan                                                                                                         Accumulated Depreciation
 Bangunan                   205.990.660      11.081.868                     --                  --       217.072.528                         Building
Total                       256.993.010                                                                  245.911.142                            Total


Aset kerja sama operasi adalah milik WIKA Realty,                      Assets of joint operation belong to WIKA Realty,
WIKA Gedung, dan WEGE SP.                                              WIKA Gedung and WEGE SP.
•   Aset kerja sama operasi milik WIKA Realty                          • Assets of joint operation owned by WIKA Realty
    merupakan aset bersama atas kerjasama                                 are joint assets for the joint operation of the
    operasi      proyek   Tamansari   Jivva   yang                        Tamansari Jivva project located in the Klungkung
    terletak di daerah Klungkung, Bali dengan                             area, Bali with PT Dwa Investama.
    PT Dwa Investama.
•   Aset kerja sama operasi bangunan milik WIKA                        •    Asset of joint operation building owned by WIKA
    Gedung terdiri dari:                                                    Gedung consists of:
    a. Hotel D’Braga yang terletak di atas tanah                            a. D'Braga Hotel which located on HGB land No.
        HGB No. 649, atas nama PT Sarinah                                      649, on behalf of PT Sarinah (Persero)
        (Persero) seluas 1.763 m2 di Jalan Braga                               covering an area of 1,763 sqm on Jalan Braga
        No. 10, Bandung, Jawa Barat, dimana                                    No. 10, Bandung, West Java, whereas the
        pembangunan hotel tersebut merupakan                                   construction of the hotel is a joint operation
        kerjasama operasi antara WIKA Gedung                                   between the Company and PT Sarinah
        dengan PT Sarinah (Persero), yang tertuang                             (Persero), which is stated in the Build,
        dalam Perjanjian Bangun, Guna, Serah                                   Operate and Transfer (BOT) agreement which
        Build, Operate and Transfer (BOT) yang                                 was notarized with Deed No.1 dated March
        telah diaktakan dengan Akta No.1 tanggal 10                            10, 2016 by Yunita Permatasari S.H., Notary
        Maret 2016 oleh Yunita Permatasari, S.H.,                              in Jakarta.
        Notaris di Jakarta.
    b. Bangunan Graha Mantap merupakan aset                                 b. Building Graha Mantap is an asset of joint
        kerjasama operasi antara WSP dengan                                    cooperation between WSP with PT Bank
        PT Bank Mandiri (Persero) Tbk yang                                     Mandiri (Persero) Tbk notarized by deed No.
        diaktakan dengan akta No. 85 tanggal 28                                85 dated May 28, 2019, by Fathiah Helmi,
        Mei 2019, oleh Fathiah Helmi, S.H., Notaris                            S.H., Notary in Jakarta and Agreement on the
        di Jakarta dan Perjanjian Pendelegasian                                Delegation of Land Development Work for
        Pekerjaan Pengembangan Lahan Mandiri                                   Mandiri Proklamasi Number: HK.02.09/A.DIR
        Proklamasi       Nomor:     HK.02.09/A.DIR.                            .WG.6445/2019 dated August 2, 2019.
        WG.6445/2019 tanggal 2 Agustus 2019.                                   The building was carried out on land with an
        Bangunan tersebut dilakukan di atas tanah                              area of approximately 4,428 sqm, with
        dengan luas lebih kurang 4.428 m2, dengan                              Certificate of Ownership, No. 787 on behalf of
        Sertifikat Hak Milik, No. 787 atas nama                                PT Bank Mandiri (Persero) Tbk, located in
        PT Bank Mandiri (Persero) Tbk yang terletak                            Pegangsaan, Menteng District, Central
                                                                 90

Page 100
PT WIJAYA KARYA (PERSERO) Tbk                                                                              PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                                        AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                                     NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                                                 FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                                                      For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                                               June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                                                             And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                                                            Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                                                          (In Thousand Rupiah, unless Otherwise Stated)
          di kelurahan Pegangsaan, Kecamatan                                                      Jakarta City, DKI Jakarta.
          Menteng, Kota Jakarta Pusat, DKI Jakarta.
       c. Bangunan Pertamina Mandalika International                                          c. The Pertamina Mandalika International Street
          Street Circuit yang merupakan aset                                                     Circuit    building  which    represent    a
          kerjasama       WIKA     Gedung     dengan                                             collaboration asset WIKA Gedung with
          PT Pengembangan Pariwisata Indonesia                                                   PT Pengembangan Pariwisata Indonesia
          (Persero) (“ITDC”) berdasarkan Surat                                                   (Persero) (“ITDC”) based on the Work Order
          Perintah Kerja No. 318/DIR/ITDC.01/X/2021                                              No. 318/DIR/ITDC.01/X/2021 dated October
          tanggal 7 Oktober 2021 (SPK). Bangunan                                                 7, 2021. The building is located at ITDC
          tersebut terletak di ITDC Mandalika Tourism                                            Mandalika Tourism Complex, Kuta, Pujut,
          Complex, Kuta, Pujut, Kabupaten Lombok                                                 Central Lombok Regency, West Nusa
          Tengah, Nusa Tenggara Barat (Catatan 53).                                              Tenggara (Note 53).

Pada tanggal 30 Juni 2026 dan 31 Desember 2025,                                         As of June 30, 2026 and December 31, 2025,
beban penyusutan aset kerjasama operasi                                                 depreciation expenses of assets of joint operation
dialokasikan ke beban pokok pendapatan (Catatan                                         allocated to cost of revenues (Note 45) amounted to
45) masing-masing sebesar sebesar Rp6.096.087                                           Rp6,096,087 and Rp11,081,868, respectively.
dan Rp11.081.868.

22.      Goodwill                                                                                                                                        22. Goodwill

                                                                                      2026 dan/ and 2025
                                 Harga Perolehan/            Nilai Aset Neto/               Goodwill                  Penurunan Nilai                  Goodwill Neto/
                                 Acquisition Cost            Net Asset Value                                             Goodwill /                     Goodwill Net
                                                                                                                         Goodwill
                                                                                                                        Impairment
                                       Rp                               Rp                         Rp                       Rp                                    Rp

WIKA Rekon                             21.395.496                         8.834.291               12.561.205                    (7.714.153)                       4.847.052
Total                                  21.395.496                         8.834.291               12.561.205                    (7.714.153)                       4.847.052


Akun ini merupakan selisih lebih antara biaya                                           This account represents the excess of acquisition
perolehan dan bagian Grup atas nilai wajar aset                                         cost over the Group’s interest in the fair value of the
bersih entitas anak yang diakuisisi setelah dikurangi                                   net assets of the acquired subsidiaries net of
akumulasi penurunan nilai.                                                              accumulated impairment.

Berdasarkan pengujian penurunan nilai yang telah                                        Based on the impairment test which had been
dilakukan,    Manajemen       berpendapat    bahwa                                      conducted,   the  Management       believes  that
penurunan nilai goodwill telah memadai pada tanggal                                     impairment on goodwill is adequate as of June 30,
30 Juni 2026 dan 31 Desember 2025.                                                      2026 and December 31, 2025.

23.      Investasi Jangka Panjang Lainnya                                                                         23. Other Long-term Investments
Akun ini merupakan investasi Grup dengan jumlah                                         This account represents Group’s investment with
kepemilikan saham kurang dari 20% dan dicatat                                           share ownership of less than 20%, and recorded as
sebagai aset keuangan yang diukur pada nilai wajar                                      a financial asset measured at fair value through
melalui laba rugi, dengan rincian sebagai berikut:                                      profit or loss, with the following details:
                                                                                   2026
              Nama Entitas/                          Bidang Usaha/                  Persentase      Saldo Awal/        Penambahan              Kenaikan           Saldo Akhir/
              Name of Entity                        Type of Business               Kepemilikan/     Beginning         (Pengurangan)/         (Penurunan)            Ending
                                                                                    Percentage       Balance              Addition            Nilai Wajar/         Balance
                                                                                   of Ownership                         (Deduction)            Increase
                                                                                                                                            (Decrease) in
                                                                                                                                              Fair Value
                                                                                        (%)             Rp                 Rp                      Rp                  Rp

PT Jasamarga Balikpapan Samarinda      Infrastruktur Jalan Tol/
                                       Toll Road Infrastructure                       18.29             635.900.000                    --                    --        635.900.000
PT Citra Marga Lintas Jabar            Pembangunan dan Pengusahaan Jalan Tol/
                                       Construction and Development Of Toll Road      16.56             243.000.000        15.000.000                        --        258.000.000
PT Bandara Internasional Batam         Pengelolaan Kegiatan Bandar Udara/
                                       Airport Activities Management                  19.00             119.000.000                    --                    --        119.000.000

                                                                                   91

Page 101
PT WIJAYA KARYA (PERSERO) Tbk                                                                                         PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                                                   AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                                                NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                                                            FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                                                                For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                                                         June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                                                                       And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                                                                      Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                                                                    (In Thousand Rupiah, unless Otherwise Stated)
                                                                                                2026
               Nama Entitas/                               Bidang Usaha/                         Persentase    Saldo Awal/         Penambahan              Kenaikan              Saldo Akhir/
               Name of Entity                             Type of Business                      Kepemilikan/   Beginning          (Pengurangan)/         (Penurunan)               Ending
                                                                                                 Percentage     Balance               Addition            Nilai Wajar/            Balance
                                                                                                of Ownership                        (Deduction)            Increase
                                                                                                                                                        (Decrease) in
                                                                                                                                                          Fair Value
                                                                                                     (%)           Rp                   Rp                     Rp                     Rp
PT Karya Logistik Nusantara                Logistik/
                                           Logistic                                                13.95           15.000.000                      --                    --           15.000.000
PT Jasamarga Bali Tol                      Infrastruktur Jalan Tol/ Toll Road Infrastructure        0.40            3.800.000                      --                    --            3.800.000
PT Waskita Beton Precast Tbk               Industri Pabrikasi/
                                           Fabrication                                               0.95           3.643.595                      --                    --            3.643.595
PT Trans Pacific Petrochemical Indotama    Industri Petrokimia/ Petrochemical Industry               0.11           2.425.732                      --                    --            2.425.732
PT Jasamarga Akses Patimban                Infrastruktur Jalan Tol/
                                           Toll Road Infrastructure                                  0.22           1.500.000                      --                    --            1.500.000
PT Air Minum Indonesia                     Pengelolaan Air Minum/ Drinking
                                           Water Management                                        14.00               140.000                  --                       --              140.000
Total                                                                                                            1.024.409.327         15.000.000                        --        1.039.409.327


                                                                                                2025
                Nama Entitas/                               Bidang Usaha/                        Persentase    Saldo Awal/         Penambahan              Kenaikan              Saldo Akhir/
                Name of Entity                             Type of Business                     Kepemilikan/   Beginning          (Pengurangan)/         (Penurunan)               Ending
                                                                                                 Percentage     Balance               Addition            Nilai Wajar/            Balance
                                                                                                of Ownership                        (Deduction)            Increase
                                                                                                                                                        (Decrease) in
                                                                                                                                                          Fair Value
                                                                                                     (%)           Rp                  Rp                      Rp                    Rp

 PT Jasamarga Balikpapan Samarinda          Infrastruktur Jalan Tol/
                                            Toll Road Infrastructure                                 18.29        654.700.000                      --       (18.800.000)             635.900.000
 PT Citra Marga Lintas Jabar                Pembangunan dan Pengusahaan Jalan Tol/
                                            Construction and Development Of Toll Road                16.56        238.000.000                      --         5.000.000              243.000.000
 PT Bandara Internasional Batam             Pengelolaan Kegiatan Bandar Udara/
                                            Airport Activities Management                            19.00        119.000.000                      --                    --          119.000.000
 PT Karya Logistik Nusantara                Logistik/
                                            Logistic                                                 13.95          15.000.000                     --                    --           15.000.000
 PT Jasamarga Bali Tol                      Infrastruktur Jalan Tol/ Toll Road Infrastructure         0.40           3.800.000                     --                    --            3.800.000
 PT Waskita Beton Precast Tbk               Industri Pabrikasi/
                                            Fabrication                                              0.95                    --         7.920.860            (4.277.265)               3.643.595
 PT Trans Pacific Petrochemical Indotama    Industri Petrokimia/ Petrochemical Industry              0.11            2.425.732                  --                    --               2.425.732
 PT Jasamarga Akses Patimban                Infrastruktur Jalan Tol/
                                            Toll Road Infrastructure                                 0.22            1.500.000                     --                    --            1.500.000
 PT Air Minum Indonesia                     Pengelolaan Air Minum/ Drinking
                                            Water Management                                         14.00             140.000                  --                    --                 140.000
 Total                                                                                                           1.034.565.732          7.920.860           (18.077.265)           1.024.409.327



Berikut tanggal laporan penilaian dalam menentukan                                                   The following is the date of the appraisal report in
nilai wajar investasi jangka panjang lainnya                                                         determining the fair value of other long-term
berdasarkan penilai Iskandar dan Rekan dengan                                                        investments based on appraiser Iskandar dan Rekan
Patner Radithe Pramudito, S.E., M.Ec. Dev., MAPPI                                                    with Partner Radithe Pramudito, S.E., M.Ec. Dev.,
(Cert.) pada tanggal 31 Desember 2025:                                                               MAPPI (Cert.) as of December 31, 2025:
         Tanggal Laporan /                            Tanggal Penilaian /                                                Entitas/                                             Nilai Wajar/
           Report date                                  Valuation date                                                   Entities                                             Fair Value

12 Mar 2026/ Mar 12, 2026                     30 Nov 2025/ Nov 30, 2025                           PT Jasamarga Balikpapan Samarinda                                            635,900,000
12 Mar 2026/ Mar 12, 2026                     30 Nov 2025/ Nov 30, 2025                           PT Citra Marga Lintas Jabar                                                  243,000,000
12 Mar 2026/ Mar 12, 2026                     30 Nov 2025/ Nov 30, 2025                           PT Bandara Internasional Batam                                               119,000,000


Metode yang digunakan untuk pendekatan                                                               The method used for the income approach is the
pendapatan adalah metode diskonto untuk                                                              discount method for future income, and the method
pendapatan mendatang dan metode yang digunakan                                                       used for the market approach is the method of
untuk pendekatan pasar adalah metode menghitung                                                      calculating the value with the valuation ratio of the
nilai dengan rasio penilaian dari perusahaan                                                         comparison company whose shares already have
pembanding yang sahamnya telah memiliki nilai                                                        market value.
pasar.

PT Waskita Beton Precast Tbk                                                                          PT Waskita Beton Precast Tbk
PT Waskita Beton Precast Tbk bidang industri beton                                                    PT Waskita Beton Precast Tbk operates in the
pracetak (precast) dan ready mix, serta konstruksi.                                                   precast concrete and ready-mix industries, as well
Berdasarkan Putusan Berita Acara Kesepakatan                                                          as construction. Based on the decision of the
(Perjanjian Homologasi) No. SE.02.01/WB-035/2025                                                      Minutes of Agreements (Homologation Agreement)
pada tanggal 25 Juni 2025. Saldo piutang usaha                                                        No. SE.02.01/WB-035/2025 on June 25, 2025. The
(Catatan 6) dikonversi menjadi investasi jangka                                                       outstanding balance of trade account receivables
                                                                                                92

Page 102
PT WIJAYA KARYA (PERSERO) Tbk                                                                         PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                                   AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                                NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                                            FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                                              For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                                       June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                                                     And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                                                    Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                                                  (In Thousand Rupiah, unless Otherwise Stated)
panjang lainya sebesar Rp7.920.860. WIKA Beton                                (Note 6) was converted into other long-term
telah melakukan evaluasi kembali nilai wajarnya                               investments amounting to Rp7,920,860. WIKA Beton
Pada 31 Desember 2025 berdasarkan informasi                                   re-evaluated its fair value as of December 31, 2025,
yang didapat dari pasar saham menjadi                                         based on information obtained from the stock
Rp3.643.596.                                                                  market, resulting in a value of Rp3,643,596.

24.      Aset Takberwujud – Neto                                                                                    24. Intangible Assets – Net
                                                                        2026
                              Saldo Awal/        Penambahan/        Pengurangan/         Reklasifikasi/     Saldo Akhir/
                              Beginning            Addition          Deduction          Reclassification      Ending
                               Balance                                                                       Balance
                                  Rp                 Rp                  Rp                    Rp               Rp
Biaya Perolehan                                                                                                                       Acquisition Cost
 Hak
  HakPengusahaan
      Konsesi - Ruas                                                                                                            Concession Rights - Toll
   Jalan
    JalanTol
          Tol- (Catatan
                Seksi 1 52)                                                                                                                Section 1
   (Catatan 52)               4.498.087.158                    --                  --                  --    4.498.087.158                 (Note 52)
 Pengelolaan Air              1.754.265.862                    --                  --                  --    1.754.265.862            Water Treatment
 Merek Dagang                   113.430.544                    --                  --                  --      113.430.544                  Trademark
 Perangkat Lunak                129.965.175                    --                  --         22.942.744       152.907.919                    Software
 Hak Paten                      188.000.000                    --                  --                  --      188.000.000                      Patent
Aset Takberwujud dalam                                                                                                               Intangible Assets
 Pembangunan                                                                                                                     Under Development
 Hak Pengusahaan dalam                                                                                                          Concession Rights - Toll
  Penyelesaian - Seksi 2                                                                                                                   Section 2
  (Catatan 52)                3.136.971.359        224.753.665                     --                  --    3.361.725.024                 (Note 52)
                              9.820.720.098        224.753.665                     --         22.942.744    10.068.416.508
Akumulasi Amortisasi                                                                                                          Accumulated Amortization
 Hak
  HakPengusahaan
      Konsesi - Ruas                                                                                                            Concession Rights - Toll
   Jalan
    JalanTol
          Tol- (Catatan
                Seksi 1 52)                                                                                                                Section 1
   (Catatan 52)                 156.748.461         18.391.137                     --                  --     175.139.598                  (Note 52)
 Pengelolaan Air                 56.637.860         27.268.381                     --                  --      83.906.241             Water Treatment
 Perangkat Lunak                 84.930.268         12.381.537                     --                  --      97.311.805                     Software
 Hak Paten                      112.925.882            821.205                     --                  --     113.747.087                       Patent
                                411.242.471         58.862.261                     --                  --     470.104.732
Penurunan Nilai                                                                                                                               Impairment
 Hak Paten                      (71.580.354)                   --                  --                  --     (71.580.354)                       Patent
Nilai Tercatat                9.337.897.273                                                                  9.526.731.422                Carrying Value


                                                                        2025
                              Saldo Awal/        Penambahan/        Pengurangan/         Reklasifikasi/     Saldo Akhir/
                              Beginning            Addition          Deduction          Reclassification      Ending
                               Balance                                                                       Balance
                                  Rp                 Rp                  Rp                    Rp               Rp
Biaya Perolehan                                                                                                                       Acquisition Cost
 Hak
  HakPengusahaan
      Konsesi - Ruas                                                                                                            Concession Rights - Toll
   Jalan
    JalanTol
          Tol- (Catatan
                Seksi 1 52)                                                                                                                Section 1
   (Catatan 52)               4.498.087.158                  --                    --                  --    4.498.087.158                 (Note 52)
 Pengelolaan Air              1.754.265.862                  --                    --                  --    1.754.265.862            Water Treatment
 Merek Dagang                   113.430.544                  --                    --                  --      113.430.544                  Trademark
 Perangkat Lunak                124.606.585          3.827.190                     --          1.531.400       129.965.175                    Software
 Hak Paten                      188.000.000                  --                    --                  --      188.000.000                      Patent
Aset Takberwujud dalam                                                                                                               Intangible Assets
 Pembangunan                                                                                                                     Under Development
 Hak Pengusahaan dalam                                                                                                          Concession Rights - Toll
  Penyelesaian - Seksi 2                                                                                                                   Section 2
  (Catatan 52)                2.732.942.153        404.029.206                     --                  --    3.136.971.359                 (Note 52)
                              9.411.332.302        407.856.396                     --          1.531.400     9.820.720.098
Akumulasi Amortisasi                                                                                                          Accumulated Amortization
 Hak
  HakPengusahaan
      Konsesi - Ruas                                                                                                            Concession Rights - Toll
   Jalan
    JalanTol
          Tol- (Catatan
                Seksi 1 52)                                                                                                                Section 1
   (Catatan 52)                 118.487.217         38.261.244                     --                  --     156.748.461                  (Note 52)
 Pengelolaan Air                  2.101.097         54.536.763                     --                  --      56.637.860             Water Treatment
 Perangkat Lunak                 59.714.353         23.880.147                     --          1.335.768       84.930.268                     Software
 Hak Paten                       92.265.933         20.659.949                     --                  --     112.925.882                       Patent
                                272.568.600        137.338.103                     --          1.335.768      411.242.471
Penurunan Nilai                                                                                                                              Impairment
 Hak Paten                                  --     (71.580.354)                    --                  --     (71.580.354)                      Patent
Nilai Tercatat                9.138.763.702                                                                  9.337.897.273                Carrying Value



Pada tahun 2025, WIKA Bitumen mengakui                                        In 2025, WIKA Bitumen recognized an impairment
penurunan nilai atas aset tak berwujud berupa hak                             loss on intangible assets in the form of patents
paten    dengan     jumlah     kerugian   sebesar                             amounting to Rp71,580,354, which was recorded
Rp71.580.354 yang dicatat pada beban lain-lain                                under other expenses (Note 48).
(Catatan 48).
                                                                        93

Page 103
PT WIJAYA KARYA (PERSERO) Tbk                                                 PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                           AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                    FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                        For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                 June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                               And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                              Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                            (In Thousand Rupiah, unless Otherwise Stated)
Pada 31 Desember 2025 WIKA Rekon melakukan                      As of December 31, 2025, WIKA Rekon measures
pengukuran nilai aset takberwujud menggunakan                   its intangible assets using the fair value model. The
model nilai wajar yang telah dinilai oleh KJPP Tobing           fair values were determined based on valuation
Panuturi & Rekan berdasarkan laporan KJPP No.                   reports issued by KJPP Tobing Panuturi & Rekan
00029/2.0171 00/BS/04/0481/1/I/2026 pada tanggal                No. 00029/2.0171-00/BS/04/0481/1/I/2026 dated
14 Januari 2026. Saldo pada 31 Desember 2025                    January 14, 2026, The carrying amounts of
sebesar Rp113.532.086 masing-masing terdiri dari                intangible assets as of December 31, 2025
Merek sebesar Rp79.932.086 dan Jaringan                         amounted to Rp113,532,086, respectively, consisting
Distribusi sebesar Rp33.600.000.                                of Brands amounting to Rp79,932,086 and
                                                                Distribution Networks amounting to Rp33,600,000.

Pada tahun 2025, berdasarkan hasil penilaian nilai              In 2025, based on the result of the market value
pasar oleh KJPP, aset takberwujud WIKA Rekon                    assessment by KJPP, the intangible assets of WIKA
mengalami peningkatan nilai sebesar Rp101.542                   Rekon increase in value by Rp101,542 which is
yang dicatat sebagai keuntungan revaluasi aset                  recorded as the intangible asset revaluation gain.
takberwujud.

Pada tahun 2025, WIKA IKON mereklasifikasi                      On 2025, WIKA IKON reclassified office equipment
perlengkapan kantor (Catatan 20) menjadi aset                   (Note 20) into intangible assets amounting to
takberwujud sebesar Rp1.531.400.                                Rp1,531,400.

Merek dagang yang dimiliki oleh Winner terdiri atas             Trademark of Winner consists of WIKA Solar Water
WIKA Solar Water Heater (SWH) dan perjanjian                    Heater (SWH) and agreement distribution channels
jaringan distribusi ke seluruh Indonesia.                       throughout Indonesia.

Hak paten yang dimiliki oleh WIKA Bitumen dengan                The patent owned by WIKA Bitumen with a Patent
Sertifikat Paten Kementerian Hukum dan Hak                      Certificate from the Ministry of Law and Human
Asasi Manusia Nomor IDP00007529 merupakan                       Rights Number IDP00007529 is a patent for the
paten atas proses pemurnian aspal buton sistem                  buton asphalt purification process with a feedback
umpan-balik dengan solid separator dan dryer yang               system with an improved solid separator and dryer.
disempurnakan. Perlindungan Paten tersebut                      Patent protection is granted for 20 years
diberikan untuk 20 tahun terhitung sejak tanggal                from the date of filing, which is December 3, 2018.
penerimaan yaitu tanggal 3 Desember 2018.

Beban amortisasi untuk tahun-tahun yang berakhir                Amortization expenses for the years ended June 30,
pada 30 Juni 2026 dan 31 Desember 2025 sebesar                  2026 and December 31, 2025 amounted to
Rp58.862.261     dan     Rp137.338.103     yang                 Rp58,862,261 and Rp137,338,103, respectively,
dialokasikan pada beban pokok pendapatan                        which are allocated to cost of revenues (Note 45).
(Catatan 45).

25.   Aset Lain-lain                                                                                25. Other Assets
a.    Aset Lancar Lain-lain                                                                 a. Other Current Assets
Aset Lancar Lain-lain merupakan aset tersedia untuk               Other Current Assets is assets available for sale,
dijual sebesar Rp320.211.670 dan Rp314.506.866                    Rp320,211,670 and Rp314,506,866 at June 30,
per 30 Juni 2026 dan 31 Desember 2025, yang                       2026 and December 31, 2025 is factory assets in
sebagian besar merupakan pabrik di Balaraja dengan                Balaraja with a land area of 56,875 square meters
tanah seluas 56.875 meter persegi milik WIKA IKON,                in Cileungsi on behalf of WIKA IKON, which are
yang direncanakan akan dijual (Catatan 20) dan                    planned to be sold (Note 20) and additions in
penambahan pada tahun 2025 merupakan mesin                        2025 represent machinery and equipment at the
dan peralatan pada pabrik tersebut.                               plant.




                                                           94

Page 104
PT WIJAYA KARYA (PERSERO) Tbk                                                   PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                             AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                          NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                      FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                        For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                 June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                               And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                              Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                            (In Thousand Rupiah, unless Otherwise Stated)
b.    Aset Tidak Lancar Lain-lain                                                     b. Other Non Current Assets
                                             2026                      2025
                                              Rp                        Rp
Aset Hak Guna-Bersih                          446.606.298               453.134.910             Right-of-Use Assets-Net
Dana yang Dibatasi
  Penggunaannya                               111.830.814               282.483.452                    Restricted Funds
Aset Tidak Digunakan                                    --               22.192.546                       Unused Asset
Peralatan dan Perlengkapan                                                                         Operating Equipment
  Operasional                                  20.436.525                20.436.525                      and Supplies
Beban Tangguhan                                                                                     Sukuk Mudharabah
  Sukuk Mudharabah                              2.045.717                 3.430.430                Deferred Expenses
Beban Ditangguhkan                                372.000                   372.000                  Deferred Expenses
Lain-lain                                      65.026.930                66.914.474                              Others
Total                                         646.318.284               848.964.337                                Total


•    Aset Hak Guna                                              • Right-of-use Assets
     Aset hak guna tanah merupakan sewa Hotel                     Right-of-use assets land represent the land lease
     Grand Inna Kuta (GIK), Inna Sindhu Bali Beach,               of Hotel Grand Inna Kuta (GIK), Inna Sindhu Bali
     dan Inaya Putri Bali, milik HIPRO, dengan jangka             Beach and Inaya Putri Bali, belongs to HIPRO,
     waktu 20 - 33 tahun.                                         with period of 20 - 33 years.

     Aset hak guna tanah dan bangunan KSO Laswi                    The land and building use rights assets of KSO
     merupakan aset bersama atas kerjasama                         Laswi are joint assets in collaboration with
     dengan PT Kereta Api Indonesia yang menjadi                   PT Kereta Api Indonesia which is a business area
     kawasan bisnis terletak di Jalan Laswi, Kelurahan             located on Jalan Laswi, Kacapiring Village,
     Kacapiring, Batununggal, Kota Bandung, Jawa                   Batununggal, Bandung City, West Java.
     Barat.

•    Beban ditangguhkan merupakan biaya yang                    • Deferred expenses represent costs incurred for
     dikeluarkan untuk pengembangan kawasan-                      the development areas of WIKA Realty that are
     kawasan pada WIKA Realty yang masih dalam                    still in the process for preparation and
     proses persiapan dan pengurusan perizinan.                   administration.

•    Peralatan dan perlengkapan operasional yang                • Operational equipment and supplies used for
     digunakan untuk operasional hotel yang antara                hotel operations which include spoons, forks,
     lain terdiri dari sendok, garpu, piring, gelas,              plates, glasses, cups and the like as well as linen.
     cangkir dan sejenisnya serta linen.

•    Aset tidak digunakan merupakan alat proyek yang            • Unused assets are project tools that are no longer
     sudah tidak digunakan dan masih memiliki nilai               in use and still have value benefits.
     manfaat.

•    Retensi bank merupakan dana milik WIKA Realty              • Bank retention is a fund belong to WIKA Realty
     yang ditahan oleh bank karena belum selesainya               held by bank due to the completion of the
     pengurusan sertifikat.                                       certificate management.
•    Dana yang dibatasi penggunaannya WIKA Beton                • WIKA Beton's restricted fund is a current account
     merupakan rekening giro yang penggunaannya                   whose use is restricted by PT Bank CIMB Niaga
     dibatasi oleh PT Bank CIMB Niaga Tbk terkait                 Tbk in relation to loans to the iB Investment
     dengan pinjaman terhadap fasilitas Pembiayaan                Financing facility (Note 37).
     Investasi iB (Catatan 37).
•    Beban tangguhan sukuk mudharabah merupakan                 • Sukuk mudharabah deferred expenses represent
     biaya emisi yang timbul dari penerbitan sukuk                issuance costs arising from the issuance of sukuk
     mudharabah (Catatan 38) dan akan diamortisasi                mudharabah (Note 38) and will be amortized on a
     secara garis lurus.                                          straight-line basis.

                                                           95

Page 105
PT WIJAYA KARYA (PERSERO) Tbk                                                 PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                           AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                    FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                         For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                  June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                                And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                               Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                             (In Thousand Rupiah, unless Otherwise Stated)
26.     Pinjaman Jangka Pendek                                                                    26. Short-term Loan
Rincian pinjaman jangka pendek kepada pihak                     Details of short-term loan to related parties and third
berelasi dan pihak ketiga adalah sebagai berikut:               parties are as follows:

                                                                                      2026                   2025
                                                                                       Rp                     Rp
Pihak Berelasi/ Related Parties                                                         66.145.046             83.055.267
Pihak Ketiga/ Third Parties                                                            158.617.057            158.617.057
Total                                                                                  224.762.103            241.672.324


Rincian pinjaman jangka pendek             berdasarkan          The details of short-term loans based on creditors
kreditur adalah sebagai berikut:                                are as follows:

Entitas Anak/ Subsidiaries
Pihak Berelasi (Catatan 52)/ Related Parties (Note 52)
  PT Bank Mandiri (Persero) Tbk                                                         33.576.790             42.000.000
  PT Bank Negara Indonesia (Persero) Tbk                                                31.038.256             31.038.257
  PT Bank Rakyat Indonesia (Persero) Tbk                                                 1.530.000                      --
  Lembaga Pembiayaan Ekspor Indonesia - Indonesia Eximbank                                       --            10.017.010
  Subtotal                                                                              66.145.046             83.055.267
Pihak Ketiga/ Third Parties
  PT Bank CIMB Niaga Tbk                                                               158.617.057           158.617.057
  Subtotal                                                                             158.617.057           158.617.057

Total                                                                                  224.762.103           241.672.324


PT Citra Lautan Teduh                                           PT Citra Lautan Teduh
Lembaga Pembiayaan Ekspor Indonesia                             Lembaga Pembiayaan Ekspor Indonesia (LPEI)
(LPEI)
Pada tanggal 20 Juni 2025, PT Citra Lautan Teduh            On June 20, 2025, PT Citra Lautan Teduh (CLT) and
(CLT) dan Lembaga Pembiayaan Ekspor Indonesia               Lembaga Pembiayaan Ekspor Indonesia (Indonesia
(Indonesia Eximbank) mengadakan Perjanjian                  Eximbank) entered into a Working Capital Export
Fasilitas Kredit Modal Kerja Ekspor (“KMKE”)                Credit Facility Agreement (“KMKE”) with a financing
dengan     nilai   plafon   pembiayaan     sebesar          limit (plafond) of Rp60,000,000 and a Guarantee
Rp60.000.000 dan Fasilitas Penjaminan dengan nilai          Facility with a maximum financing limit of
maksimal pembiayaan sebesar Rp10.000.000.                   Rp10,000,000. The term of the KMKE facility is 12
Jangka waktu fasilitas KMKE adalah 12 bulan sejak           months and it bears interest at JIBOR 3 Months (3M)
dan dikenakan bunga JIBOR 3 Months (3M) + 1,78%             + 1.78% per annum. This KMKE loan facility is used
per annum. Fasilitas pinjaman KMKE ini digunakan            to accelerate the payment of the Debtor’s trade
untuk percepatan pembayaran piutang usaha debitur           receivables from the employer for overseas projects
kepada pemberi kerja untuk proyek luar negeri yang          with an export orientation and/or to support export
berorientasi ekspor dan/ atau penunjangan ekspor.           activities.

Masa berlaku kredit sampai dengan 20 Juni 2026.             The credit validity period until June 20, 2026.

Pinjaman tersebut dijamin dengan piutang,                       The loan is pledged by receivebles, inventories, land
persediaan, tanah dan bangunan (Catatan 6, 11, dan              and building (Notes 6, 11 and 20).
20).

Selama      masa      pembiayaan    CLT     wajib           CLT shall maintain financial performance indicators
mengusahakan kinerja keuangan dengan indikator              as follows:
sebagai berikut:
• Current Ratio minimal sebesar 100%;                       • Current Ratio minimum of 100%;
• Debt to Equity Ratio maksimal 300%; dan                   • Debt to Equity Ratio maximum of 300%; and
• Debt Service Coverage Ratio minimal 100%.                 • Debt Service Coverage Ratio minimum of 100%.
                                                           96

Page 106
PT WIJAYA KARYA (PERSERO) Tbk                                                 PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                           AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                    FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                         For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                  June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                                And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                               Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                             (In Thousand Rupiah, unless Otherwise Stated)
PT Wijaya Karya Bangunan Gedung Tbk (WIKA                       PT Wijaya Karya Bangunan Gedung Tbk (WIKA
Gedung)                                                         Gedung)
PT Bank Syariah Indonesia (Persero) Tbk                         PT Bank Syariah Indonesia (Persero) Tbk
Berdasarkan Surat No. 04/130-3/SP3/CB2 Tanggal                  Based on Letter No. 04/130-3/SP3/CB2 dated
23 Oktober 2024 WIKA Gedung menerima fasilitas                  October 23, 2024 WIKA Gedung received non-cash
kredit non-cash loan dari PT Bank Syariah Indonesia             loan credit facility from PT Bank Syariah Indonesia
(Persero) Tbk dengan ketentuan dan syarat sebagai               (Persero) Tbk with terms and conditions as follows:
berikut:
a. Fasilitas Non-Cash Loan                                      a. Non-Cash Loan Facility:
   Limit Kredit : Rp 400.000.000                                  Credit Limit : Rp400,000,000
   Jangka         : 23 Oktober 2024 sampai dengan                  Time Period : October 23, 2024 until October
   Waktu            23 Oktober 2026                                              23, 2026
   Tujuan         : Untuk kebutuhan modal kerja                   Intended Use : For the Company's working
   Penggunaan       Perusahaan melalui pembiayaan                                capital needs through financing
                    terhadap supplier dari obligor                               the obligor supplier

b. Fasilitas Cash Loan:                                     b. Cash Loan Facility
   Limit Kredit  : Rp300.000.000                               Credit Limit  : Rp300,000,000
   Jangka        : 23 Oktober 2024 sampai dengan               Time Period   : October 23, 2024 until October
   Waktu           23 Oktober 2026                                              23, 2026
   Tujuan        : Untuk kebutuhan modal kerja                 Intended Use : For the Company's working
   Penggunaan      Perusahaan melalui pembiayaan                                capital needs through financing
                   terhadap supplier dari obligor                               the obligor supplier

Selama masa pembiayaan WIKA Gedung wajib                        WIKA Gedung required to maintain financial
mengusahakan kinerja keuangan dengan indikator                  performance indicators as follows: Current Ratio of at
sebagai berikut: Current Ratio minimal 100%, Debt               least 100%, Debt to Equity Ratio (DER) maximum of
Equity Ratio (DER) maksimal 300%, dan Debt                      300% and Debt Service Coverage Ratio (DSCR)
Service Coverage Ratio (DSCR) minimal 100%.                     minimum 100%.

PT Bank DKI                                                 PT Bank DKI
Berdasarkan SPPK No 1763/SPPK/925/XI/2023                   Based on Credit Approval Letter (SPPK) No.
tanggal 6 November 2023, WIKA Gedung menerima               1763/SPPK/925/XI/2023 dated November 6, 2023,
fasilitas kredit Cash Loan dan Non-Cash Loan dari           WIKA Gedung obtained Cash Loan and Non-Cash
PT Bank DKI dengan ketentuan dan syarat sebagai             Loan credit facilities from Bank DKI under the
berikut:                                                    following terms and conditions:
a. Fasilitas Non-Cash Loan:                                 a. Non-Cash Loan Facility:
   Limit Kredit : Rp200.000.000                                 Credit Limit  : Rp200,000,000
   Jangka         : 7 November 2023 – 7 November                Time Period : November          7,    2023     until
   Waktu            2025                                                         November 7, 2025
   Tujuan         : Untuk kebutuhan modal kerja                 Intended Use : For the Company's working
   Penggunaan       Perusahaan melalui pembiayaan                                capital needs through financing
                    terhadap supplier dari obligor                               the obligor supplier
   Agunan         : Rasio kecukupan nilai jaminan               Collateral    : The adequacy ratio of the
                    setiap saat harus bernilai 100%                              collateral value must be worth
                    dari jumlah fasilitas terutang                               100% of the total facility owed to
                    pada bank                                                    the bank at any time

b. Fasilitas Cash Loan:                                     b. Cash Loan Facility:
   Limit Kredit : Rp50.000.000                                 Credit Limit : Rp50,000,000
   Jangka        : 7 November 2023 – 7 November                Time Period : November      7,   2023                until
   Waktu           2025                                                        November 7, 2025
   Tingkat       : 9,25% p.a                                   Interest     : 9.25% p.a
   Bunga
   Provisi       : 0,50% p.a                                       Provision    : 0.50% p.a
   Tujuan        : Untuk kebutuhan modal kerja                     Intended Use : For the Company's             working

                                                           97

Page 107
PT WIJAYA KARYA (PERSERO) Tbk                                                  PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                            AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                         NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                     FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                         For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                  June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                                And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                               Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                             (In Thousand Rupiah, unless Otherwise Stated)
   Penggunaan      Perusahaan melalui pembiayaan                                 capital needs through financing
                   terhadap supplier dari obligor                                the obligor supplier
Selama masa pembiayaan WIKA Gedung wajib                    WIKA Gedung required to maintain financial
mengusahakan kinerja keuangan dengan indikator              performance indicators as follows: Current Ratio of
sebagai berikut: Current Ratio minimal 1 kali, Debt         at least 1 time; Debt to Equity Ratio (DER) maximum
Equity Ratio (DER) maksimal 4 kali dan Debt Service         of 4 times and Debt Service Coverage of at least
Coverage minimal 100%.                                      100%.

PT Bank Mandiri (Persero) Tbk                               PT Bank Mandiri (Persero) Tbk
Berdasarkan Addendum perjanjian kredit Modal                Based on Addendum Credit Working Capital
Kerja No. CBG.CB5/SIC2.SPPK.234/2025 tanggal                agreement        No.     CBG.CB5/SIC2.SPPK.234/2025
28 Mei 2025 WIKA Gedung memperoleh fasilitas                dated May 28, 2025 WIKA Gedung obtain credit
kredit dengan persyaratan sebagai berikut:                  facility with the following terms and conditions:
a. Fasilitas KMK Transaksional                              a. Transactional of Working Capital Facility
   Limit Kredit : Rp95.000.000 (Tranche A)                       Credit Limit : Rp95,000,000 (Tranche A)
                   Rp95.000.000 (Tranche B)                                         Rp95,000,000 (Tranche B)
   Jangka        : 28 Mei 2025 sampai dengan 10                  Time Period : May 28, 2025 until June 10,
   Waktu           Juni 2026                                                        2026
   Tingkat       : 8,50% per tahun (Tranche A)                   Interest Rate : 8.50% per year (Tranche A)
   Bunga           8,25% per tahun (Tranche B)                                      8.25% per year (Tranche B)
   Tujuan        : Tambahan modal kerja                          Intended Use : Additional working capital
   Penggunaan

b. Fasilitas Non-Cash Loan                                      b. Non-Cash Loan Facility
   Limit Kredit : Rp900.000.000                                    Credit Limit : Rp900,000,000
   Jangka        : 28 Mei 2025 sampai dengan 10                    Time Period : May 28, 2025 until June 10,
   Waktu           Juni 2026                                                      2026
   Tujuan        : Bank Garansi and Letter of Credit               Intended Use : Bank Guarantee and Letter of
   Penggunaan      (L/C)                                                          Credit (L/C)

c. Supplier Financing                                           c.   Supplier Financing
   Limit Kredit : Rp300.000.000                                      Credit Limit : Rp300,000,000
   Jangka        : 28 Mei 2025 sampai dengan 10                      Time Period : May 28, 2025 until June 10,
   Waktu           Juni 2026                                                         2026
   Tujuan        : Pembiayaan untuk Pemasok/                         Intended Use : Financing      for     Supplier/
   Penggunaan      Subkontraktor     atas    dasar                                   Subcontractor on the basis of
                   akseptasi Invoice secara without                                  acceptance of invoices without
                   recourse                                                          recourse

d. Supplier Financing dengan Jaminan Tunai                      d. Supplier Financing with Cash Collateral
   Limit Kredit : Rp100.000.000                                    Credit Limit : Rp100,000,000
   Jangka        : 28 Mei 2025 sampai dengan 10                    Time Period : May 28, 2025 until June 10,
   Waktu           Juni 2026                                                       2026
   Tujuan        : Pembiayaan untuk Pemasok/                       Intended Use : Financing for Supplier/ Sub
   Penggunaan      Subkontraktor     atas    dasar                                 contractor on the basis of
                   akseptasi Invoice secara without                                acceptance of invoices without
                   recourse                                                        recourse

Joint collateral dan cross default dengan seluruh               Joint collateral and cross default with all credit
fasilitas kredit PT Wijaya Karya Bangunan Gedung                facilities PT Wijaya Karya Bangunan Gedung Tbk in
Tbk di PT Bank Mandiri (Persero) Tbk.                           PT Bank Mandiri (Persero) Tbk.

Selama masa pembiayaan WIKA Gedung wajib                        During the period of financing, WIKA Gedung is
menjaga rasio keuangan yaitu current ratio minimal              required to maintain the financial ratio of the current
sebesar 100%, leverage maksimal 500%, EBITDA to                 ratio of at least 100%, maximum leverage of 500%,
                                                           98

Page 108
PT WIJAYA KARYA (PERSERO) Tbk                                                  PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                            AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                         NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                     FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                         For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                  June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                                And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                               Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                             (In Thousand Rupiah, unless Otherwise Stated)
interest minimal sebesar 200%, dan DSCR minimal                 EBITDA to interest at least 200%, and DSCR at least
sebesar 100%. Memberitahukan secara tertulis                    100%. Notify in writing to PT Bank Mandiri (Persero)
kepada PT Bank Mandiri (Persero) Tbk atas                       Tbk upon changes in working capital and change of
perubahan modal kerja dan penggantian pengurus.                 management.

PT Bank Negara Indonesia (Persero) Tbk                      PT Bank Negara Indonesia (Persero) Tbk
Berdasarkan perjanjian Kredit Modal Kerja                   Based on Transactional of Working Capital Capital
Transaksional No. 108 tanggal 30 Mei 2016 yang              Agreement No. 108 dated May 30, 2016 made in the
dibuat dihadapan Djumini Setyoadi, S.H., M.Kn.,             presence of Djumini Setyoadi, S.H., M.Kn., Notary in
Notaris di Jakarta, dan persetujuan perpanjangan            Jakarta, and approval of the Extension of
Fasilitas   Kredit   Modal     Kerja    Transaksional       Transactional of Working Capital Capital Facility
No. COB3/4/037/R tanggal 27 Mei 2025 WIKA                   No. COB3/4/037/R dated May 27, 2025 WIKA
Gedung memperoleh fasilitas kredit dengan                   Gedung obtain credit facility with the following terms
persyaratan sebagai berikut:                                and conditions:
a. Fasilitas Cash Loan                                      a. Cash Loan Facility
   Plafon        : Rp200.000.000                                Plafond      : Rp200,000,000
   Jangka        : 1 (satu) tahun, Periode tanggal              Time         : 1 (one) year period from May 30,
   Waktu           30 Mei 2025 s/d 29 Mei 2026                  Period         2025 until May 29, 2026
   Tingkat       : 9,75% per tahun                              Interest     : 9.75% per annum
   Bunga
   Jaminan       : Atas piutang usaha, tagihan                      Warranty       : The accounts receivable, gross
                   bruto dan tagihan termin yang                                     amount due from customers, and
                   telah diikat secara Cessie.                                       installment receivables projects
                                                                                     in Connective is Cessie.

b. Fasilitas Non-Cash Loan                                      b. Non-Cash Loan Facility
   Plafon        : Rp550.000.000                                   Plafond     : Rp550,000,000
   Jangka        : 1 (satu) tahun, Periode tanggal                 Time        : 1 (one) year period from May 30,
   Waktu           30 Mei 2025 s/d 29 Mei 2026                     Period        2025 until May 29, 2026
   Tingkat       : 9,75% per tahun                                 Interest    : 9.75% per year
   Bunga
   Jaminan       : Atas piutang usaha, tagihan                      Warranty       : The accounts receivable, gross
                   bruto dan tagihan termin yang                                     amount due from customers, and
                   telah diikat secara Cessie.                                       installment receivables projects
                                                                                     in Connective is Cessie.

Selama masa pembiayaan WIKA Gedung wajib                        WIKA Gedung shall maintain financial performance
mengusahakan kinerja keuangan dengan indikator                  indicators as follows: Current Ratio of at least 1 time;
sebagai berikut: Current Ratio minimal 1 kali, Debt             Debt to Equity Ratio (DER) maximum of 4 times and
Equity Ratio (DER) maksimal 4 kali dan Debt Service             Debt Service Coverage of at least 100%.
Coverage minimal 100%.

PT Bank Rakyat Indonesia (Persero) Tbk                          PT Bank Rakyat Indonesia (Persero) Tbk
Berdasarkan       perjanjian    nomor     R.II.297-             Based on the agreement number number R.II.297
CRO/COD/LAD/11/2024 tertanggal 21 November                      CRO/COD/LAD/11/2024 dated November 21, 2024,
2024, WIKA Gedung mendapatkan persetujuan                       WIKA Gedung have approved of the Extension of
Perpanjangan fasilitas Kredit Modal Kerja dan                   Working Capital Credit facility and extension of Non
perpanjangan fasilitas Non-Cash Loan dari PT Bank               Cash Loan facility from PT Bank Rakyat Indonesia
Rakyat Indonesia (Persero) Tbk, dengan persyaratan              (Persero) Tbk with the following credit terms:
kredit sebagai berikut:

Fasilitas Non-Cash Loan                                         Non-Cash Loan Facility
Limit Kredit       Rp800.000.000                                Credit Limit     Rp800,000,000
Batas Akhir        30 November 2024 s/d 30                      Registration     November    30,   2024 until
Pendaftaran        November 2025                                Deadline         November 30, 2025
Tujuan             Bank Garansi, LC/SKBDN dan                   Intended Use     Bank Guarantee, LC/SKBDN,

                                                           99

Page 109
PT WIJAYA KARYA (PERSERO) Tbk                                                PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                          AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                       NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                   FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                        For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                 June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                               And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                              Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                            (In Thousand Rupiah, unless Otherwise Stated)
Penggunaan          KMK Buyer, dan SCF A/P                                          KMK Buyer, and SCF A/P
Agunan              Agunan terkait fasilitas       KMK       Collateral             Collateral related       to    KMK
                    Konstruksi.                                                     facilities Construction.

Selama masa pembiayaan, hal-hal yang tidak boleh             During the loan period, there are matters not allowed
dilakukan terkait perjanjian yaitu mengajukan                to be carried on as stated in the covenants namely,
permohonan pailit debitur kepada pengadilan niaga            declaration of bankruptcy of the debtor to the
dan mengadakan transaksi dengan pihak yang                   Commercial Court and enter into transactions with
berafiliasi maupun pihak ketiga diluar aspek                 affiliated parties and third parties outside the aspect
kewajaran.                                                   of fairness.

PT Bank Tabungan Negara (Persero) Tbk                        PT Bank Tabungan Negara (Persero) Tbk
Berdasarkan Addendum perjanjian kredit No.                   Based on Addendum credit agreement No.
231/JKC/COM/CSMU/IV/2018 tanggal 25 April 2018,              231/JKC/COM/CSMU/IV/2018 dated April 25, 2018,
WIKA Gedung menerima fasilitas kredit Non Cash               WIKA Gedung received Non-Cash Loan credit facility
Loan dari PT Bank Tabungan Negara (Persero) Tbk              from PT Bank Tabungan Negara (Persero) Tbk with
dengan ketentuan dan syarat sebagai berikut                  the following terms and conditions:
sebagai berikut:

Fasilitas Non-Cash Loan                                      Non-Cash Loan Facility
Limit Kredit       : Rp700.000.000                           Credit Limit   : Rp700,000,000
Batas        Akhir : sampai dengan 31 Januari 2023           Registration   : until January 31, 2023 and not
Pendaftaran          dan tidak diperpanjang                  Deadline         extended
Tujuan             : Bank     Garansi    (Bid bond),         Intended Use   : Bank Guarantee (Bid bond),
Penggunaan           Advance Payment Penggunaan                               Advance       Payment    Bond,
                     Bond, Performance Bond dan                               Performance       Bond     and
                     Maintenance Bond                                         Maintenance Bond
Agunan             : Cessie atas tagihan/ piutang            Collateral     : Cessie on accounts receivables
                     usaha                                                    Cash Collateral/ minimum fund
                     Cash Collateral/ minimal dana                            available in PT Bank Tabungan
                     tersedia     pada     PT  Bank                           Negara (Persero) Tbk
                     Tabungan Negara (Persero) Tbk

WIKA Gedung dapat mendaftarkan proyek yang                   WIKA Gedung may register projects that will utilise
akan menggunakan fasilitas non-cash loan sebelum             non-cash loan facilities before the registration
batas akhir pendaftaran. Setelah batas akhir                 deadline. After the registration deadline, the
pendaftaran, Perusahaan melakukan pembayaran                 Company makes payments for the facilities used.
atas fasilitas yang digunakan tersebut.

Selama masa pembiayaan WIKA Gedung wajib                     WIKA Gedung shall maintain financial performance
mengusahakan kinerja keuangan dengan indikator               indicators as follows: Current Ratio of at least 1 time;
sebagai berikut: Current Ratio minimal 1 kali, Debt          Debt to Equity Ratio (DER) maximum of 4 times and
Equity Ratio (DER) maksimal 4 kali dan Debt Service          Debt Service Coverage of at least 100% and notifying
Coverage minimal 100% serta memberitahukan                   in writing to PT Bank Tabungan Negara (Persero)
secara tertulis kepada PT Bank Tabungan Negara               Tbk of changes working capital and replacement of
(Persero) Tbk atas perubahan modal kerja dan                 management.
penggantian pengurus.

WIKA IKON                                                    WIKA IKON
PT Bank CIMB Niaga Tbk                                       PT Bank CIMB Niaga Tbk
Berdasarkan Surat Perubahan Ke-24 Nomor                      Based     on      24th    Amendment    Letter No.
002/AMD/CB/JKT/2025 Tanggal 3 Januari 2025                   002/AMD/CB/JKT/2025 dated January 3, 2025,
Atas Perubahan Pernyataan Kembali Fasilitas Kredit           regarding the Amendment to the Restatement of
No: 246/AMD/CB/JKT/2011 tanggal 6 Juni 2011,                 Credit Facility Agreement No. 246/AMD/CB/JKT/2011
yang mengubah tanggal jatuh tempo fasilitas                  dated June 6, 2011, which changes the facility’s
menjadi jangka pendek (Catatan 37).                          maturity date to short-term (Note 37).

                                                           100

Page 110
PT WIJAYA KARYA (PERSERO) Tbk                                               PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                         AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                      NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                  FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                      For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                               June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                             And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                            Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                          (In Thousand Rupiah, unless Otherwise Stated)
Masa berlaku kredit sampai dengan 1 September                The credit validity period until September 1, 2025.
2025. Terkait pinjaman yang telah jatuh tempo WIKA           According to the loan that have matured WIKA IKON
IKON sampai saat ini masih dalam proses pengajuan            is currently in the process of applying for an
perpanjangan jangka waktu fasilitas pinjaman                 extension of the loan facility tenure.

Fasilitas ini WIKA IKON wajib menyerahkan piutang            Under this facility, WIKA IKON is required to pledge
usaha dan persediaan, serta wajib memenuhi                   its trade receivables and inventory, as well as comply
persyaratan menjaga rasio keuangan sebagai                   with the following financial ratio requirements:
berikut:
• Current Ratio minimal 1 kali;                              •   Current Ratio minimum of 1 times;
• DSCR minimal 100%; dan                                     •   DSCR minimum 100%; and
• Debt to Equity Ratio maksimal 2,5 kali.                    •   Debt to Equity Ratio maximum 2.5 times.

PT Bank DKI                                                  PT Bank DKI
Fasilitas kredit pada PT Bank DKI direstrukturisasi          The credit facility from PT Bank DKI was restructured
pada tanggal 26 Juni 2025. Berdasarkan surat                 on June 26, 2025 based on Letter No.
No.KU.02.01/A.DIR.00031.WKON/2025 tanggal 18                 KU.02.01/A.DIR.00031.WKON/2025 dated March 18,
Maret 2025.                                                  2025.

Masa berlaku fasilitas kredit telah diperpanjang             The term of the credit facility has been extended until
hingga 26 Juni 2027, sehingga pinjaman tersebut              June 26, 2027, so that the loan has been reclassified
telah direklasifikasi ke pinjaman jangka panjang             to long term loan (Note 37).
(Catatan 37).

PT Wijaya Karya Rekayasa Konstruksi                          PT Wijaya Karya Rekayasa Konstruksi
PT Bank Negara Indonesia (Persero) Tbk                       PT Bank Negara Indonesia (Persero) Tbk
Berdasarkan      Surat     Persetujuan      Perubahan        Based on the Letter of Approval of Changes to the
Perjanjian Pemberian Fasilitas Kredit Tidak                  Agreement for Providing Indirect Credit Facilities No.
Langsung No. COB3/4/033/R tanggal 20 Mei 2025                COB3/4/033/R dated May 20, 2025 with the
dengan ketentuan dan syarat-syarat sebagai berikut:          following terms and conditions:
Fasilitas kredit                                             The credit facility:
a. Plafon KMK Transaksional                                  a. Plafond KMK Transactional
   Plafon          : Rp50.000.000                                 Plafon          : Rp50,000,000
   Keperluan       : Tambahan modal kerja untuk                   Purpose         : Additional working capital for
                      pengerjaan proyek – proyek                                     the work of projects won by
                      yang dimenangkan baik proyek                                   both government and private
                      pemerintah maupun swasta.                                      projects.
   Jangka waktu : 21 Mei 2025 – 20 Mei 2026                       Duration        : May 21, 2025 – May 20, 2026
   Bentuk/Sifat    : - Plafond bersifat Revolving                 Nature          : - Revolving plafond
                     - Realisasi kredit bersifat clean                              - Credit realization is clean
                       up per proyek atau angsuran                                     upper project or installments
                       sesuai termin yang masuk                                        according to incoming terms.
   Bunga           : 9,75% per tahun                              Interest rate   : 9,75% per year
   Jaminan         : Piutang termin atas proyek –                 Guarantee       : Term receivables for projects
                      proyek diikat cessie.                                          are tied to cessie.
b. Plafon Non Cash Loan (NCL)                                b. Plafond Non Cash Loan (NCL)
   Plafon        : Rp255.000.000                                 Plafon         : Rp255,000,000
   Keperluan     : - Garansi Bank/SBLC                           Purpose        : - Garansi Bank/SBLC
                   - SKBDN/LC                                                     - SKBDN/LC
                   - Fasilitas Trust Receipt (T/R)                                - Fasilitas Trust Receipt (T/R)
                   - Supply Chain Financing (SCF)                                 - Supply     Chain    Financing
                                                                                    (SCF)
   Jangka waktu     : 21 Mei 2025 – 20 Mei 2026                  Duration       : May 21, 2025 – May 20, 2026
   Bentuk/Sifat     : - SKBDN/LC:      Sight    atau             Nature         : - SKBDN/LC: Sight or Usance,
                        Usance, UPAS atau UPAU                                      UPAS or UPAU
                      - T/R: Clean Up                                             - T/R: Clean Up
                                                           101

Page 111
PT WIJAYA KARYA (PERSERO) Tbk                                               PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                         AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                      NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                  FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                      For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                               June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                             And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                            Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                          (In Thousand Rupiah, unless Otherwise Stated)
   Jaminan          : Piutang termin atas proyek –               Guarantee         : Term receivables for projects
                      proyek diikat cessie.                                          are tied to cessie.
Dalam perjanjian kredit, WIKA Rekon harus                    In the credit agreement, WIKA Rekon must maintain
mempertahankan kinerja keuangan dengan indikator             financial performance with the following financial
rasio keuangan sebagai berikut:                              ratio indicators:
1) Current Ratio (CR) minimal 1 (satu) kali Current          1) Current Ratio (CR) at least 1 (one) time Current
   Ratio adalah perbandingan antara aset lancar                 Ratio is a comparison between current assets and
   dengan utang lancar pada laporan keuangan                    current liabilities in WIKA Rekon's audited / home
   audited/home statement WIKA Rekon;                           statement financial statements;
2) Debt to Equity Ratio (DER) maksimal 4 (empat)             2) Debt to Equity Ratio (DER) maximum 4 (four)
   kali Debt to Equity Ratio adalah perbandingan                times Debt to Equity Ratio is the ratio between
   antara total utang terhadap total ekuitas pada               total liabilities to total equity in WIKA Rekon's
   laporan keuangan audited/home statement WIKA                 audited/home statement financial statements; and
   Rekon; dan
3) Rasio Debt Service Coverage (DSC) minimal                3) Debt Service Coverage (DSC) ratio of at least
   100%.                                                       100%.

Rasio Debt Service Coverage adalah perbandingan              The Debt Service Coverage ratio is the ratio
antara EBITDA dengan kewajiban angsuran jatuh                between EBITDA and maturity installments and
tempo dan bunga pada laporan keuangan                        interest on WIKA Rekon's audited/ home statement
audited/home statement WIKA Rekon.                           financial statements.

Dalam perjanjian kredit WIKA Rekon tidak                     Based on the the credit agreement, WIKA Rekon is
diperkenankan melakukan antara lain sebagai                  prohibited from undertaking, among other things, the
berikut:                                                     following actions:
1) Melakukan       perubahan      kegiatan    usaha          1) Make changes to business activities as stated in
   sebagaimana tercantum dalam anggaran dasar                   the Articles of Association of WIKA Rekon that
   WIKA       Rekon    yang     dapat    mengurangi             can reduce the ability of the Company to repay
   kemampuan WIKA Rekon melunasi fasilitas kredit               credit facilities to BNI, unless required by
   kepada BNI, kecuali dipersyaratkan oleh                      applicable laws and regulations;
   peraturan perundang-undangan yang berlaku;
2) Menjual      atau    memindahkan      hak   atau          2) Selling or transferring rights or transferring all or
    mengalihkan seluruh atau sebagian kekayaan/                 part of the assets / WIKA Rekon owned assets in
    aset milik WIKA Rekon dalam satu transaksi atau             one transaction or in several transactions;
    dalam beberapa transaksi;
3) Melakukan         peleburan,       penggabungan,          3) Conduct consolidation, merger, separation,
   pemisahan, pembubaran WIKA Rekon maupun                      dissolution of WIKA Rekon and reconstruction
   rekonstruksi (Tindakan Korporasi);                           (Corporate Actions);
4) Mengajukan permohonan Pailit atau permohonan              4) Submitting a Bankruptcy application or request
   Penundaan Kewajiban Pembayaran Utang                         for a Delay of Debt Payment Obligations (DDPO)
   (PKPU) atas PT Wijaya Karya Rekayasa                         for PT Wijaya Karya Rekayasa Konstruksi to the
   Konstruksi kepada instansi yang berwenang;                   authorized agency;
5) Melakukan perubahan bentuk hukum;                         5) Making changes in legal form;
6) Memberikan penjaminan atau pinjaman kepada                6) Provide guarantees or loans to subsidiaries,
   anak perusahaan, kecuali yang telah berjalan;                except those that have been running;
7) Melakukan perubahan komposisi pemegang                    7) Changed the shareholders composition which
   saham yang mengakibatkan Perusahaan tidak                    resulted of in the Company no longer being the
   lagi menjadi pemegang saham mayoritas; dan                   majority shareholder; and
8) Menerima tambahan fasilitas kredit dari                   8) Received additional credit facilities from other
   bank/lembaga keuangan lain atau melakukan                    banks/financial institutions or issue bonds, except
   peneribitan obligasi, kecuali dalam hal setelah              in the event that after receiving additional credit
   menerima tambahan fasilitas kredit atau                      facilities or issuing bonds, the financial ratios still
   melakukan penerbitan obligasi tersebut rasio                 meet the financial covenants Current Ratio (CR)
   keuangan masih memenuhi financial covenant                   ≥ 100%, Debt to Equity Ratio (DER) ≤ 400% and
   Current Ratio (CR) ≥ 100%, Debt to Equity Ratio              Debt Service Coverage Ratio (DSC) ≥ 100%.
                                                           102

Page 112
PT WIJAYA KARYA (PERSERO) Tbk                                                 PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                           AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                    FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                        For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                 June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                               And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                              Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                            (In Thousand Rupiah, unless Otherwise Stated)
   (DER) ≤ 400%, dan Debt Service Coverage Ratio
   (DSC) ≥ 100%.

27. Utang Usaha                                                                               27. Account Payables
Rincian utang usaha adalah sebagai berikut:                      Details of account payables are as follows:

                                                                                     2026                   2025
                                                                                      Rp                     Rp
Pihak Berelasi (Catatan 52) / Related Parties (Note 52)                               337.835.838           354.537.654
Pihak Ketiga / Third Parties                                                        3.634.121.835          3.631.714.856
Total                                                                               3.971.957.673          3.986.252.510

Utang subkontraktor merupakan utang kepada pihak                 Subcontractor payables represent payable third
ketiga atas pekerjaan yang disubkontraktorkan,                   party for work at subcontractor, such as stressing,
seperti pekerjaan stressing, pemasangan, biaya                   installation, freight costs, reduction in beam, and
angkut, penurunan beam, biaya pematokan dan lain-                peg the cost of others.
lain.

Utang pemasok merupakan utang atas pembelian                     Supplier payables represent payable on the
bahan baku untuk pelaksanaan pekerjaan/proyek,                   purchase of raw materials for the execution of the
seperti pembelian semen, pasir, besi, plat sambung               work/ project, such as the purchase of cement,
dan lain-lain.                                                   sand, iron, connecting plate etc.

Utang usaha supply chain financing merupakan                     Supply chain financing payables represent trade
utang usaha yang sudah dibayarkan oleh beberapa                  payables already paid by several banks and the
bank dan akan jatuh tempo pembayaran sampai                      payment will be due until 180 days and bears no
dengan 180 hari dan tidak dikenakan bunga.                       interest.

Rincian utang usaha berdasarkan subkontraktor dan                Details of account payables to supplier and
pemasok adalah sebagai berikut:                                  subcontractor are as follow:

                                                                                     2026                   2025
                                                                                      Rp                     Rp
Utang Pemasok dan Utang Subkontraktor/
  Supplier Payables and Subcontractor Payables                                      3.971.957.673          3.986.252.510
Utang Usaha/ Account Payables-Supply Chain Financing                                  349.673.624            280.982.455
Total                                                                               4.321.631.297          4.267.234.965


Rincian utang usaha berdasarkan supply chain                     Details of account payables to supply chain financing
financing adalah sebagai berikut:                                are as follow:

                                                                                     2026                   2025
                                                                                      Rp                     Rp

Pihak Berelasi (Catatan 52)/ Related Parties (Note 52)                                349.673.624            280.982.455

Pihak Ketiga/ Third Parties
  Sub Total                                                                                     --                     --
Total                                                                                 349.673.624            280.982.455




                                                           103

Page 113
PT WIJAYA KARYA (PERSERO) Tbk                                                PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                          AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                       NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                   FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                     For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                              June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                            And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                           Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                         (In Thousand Rupiah, unless Otherwise Stated)
28.     Utang Lain-lain                                                                        28. Other Payables
                                              2026                   2025
                                               Rp                     Rp
Pihak Berelasi (Catatan 52)                    798.588.244            794.718.718           Related Parties (Note 52)
Dikurangi Bagian Jangka Pendek               (780.719.142)          (773.119.503)            Less Short Term Portion
Bagian Jangka Panjang                                                                            Long Term Portion of
  Pihak Berelasi                                17.869.102            21.599.215                    Related Parties
Pihak Ketiga                                                                                            Third Parties
Bunga Pinjaman Ditangguhkan                  1.991.629.405          1.620.919.069                Deferred Bank Loans
Utang Pengurusan Dokumen                       249.970.906            202.227.893        Handling Document Payables
Utang Bagi Hasil                               110.117.409            107.073.675             Profit Sharing Payables
Lain-lain (masing-masing                                                                          Others (each below
  dibawah Rp10.000.000)                        179.774.110            135.689.658                    Rp10,000,000)
Sub Total                                    2.531.491.830          2.065.910.295                           Sub Total
Dikurangi Bagian Jangka Pendek               (296.490.156)          (260.201.515)             Less Short Term Portion
Bagian Jangka Panjang Pihak Ketiga           2.235.001.674          1.805.708.780   Long Term Portion of Third Parties

Bagian Jangka Panjang                        2.252.870.776          1.827.307.995                   Long Term Portion

Utang lain-lain sebagian besar merupakan titipan             Other payable mainly represents the cost of making
biaya pembuatan akta jual beli, sertifikat Hak Guna          deed of sale and purchase, certificate Hak Guna
Bangunan atas nama pembeli untuk unit-unit,                  Bangunan on behalf of buyers for these units, money
titipan uang tanda jadi yang nantinya apabila sudah          deposit that later will be transferred to advance
menentukan unit akan dialihkan ke uang muka dan              payment when the unit is already determined and
utang kepada pihak ketiga.                                   payables to other third parties.

29.     Perpajakan                                                                                      29. Taxation
a. Pajak dibayar di Muka                                                                       a.     Prepaid Taxes

                                             2026                   2025
                                              Rp                     Rp
Perusahaan                                                                                                   Company
Pajak Penghasilan                                                                                        Income Taxes
  Pasal 28A                                   173.345.668            212.214.577                          Article 28A
  Final                                         5.422.578              9.318.016                                 Final
Sub Total                                     178.768.247            221.532.593                              Sub Total

Entitas Anak                                                                                              Subsidiaries
Pajak Penghasilan                                                                                        Income Taxes
  Pasal 22                                      9.083.535              3.939.595                           Article 22
  Pasal 23                                     12.071.258                 87.304                           Article 23
  Pasal 25                                      7.986.742                 98.964                           Article 25
  Pasal 28A                                    18.001.114             32.511.801                          Article 28A
  Pasal 4 (2)                                 100.677.438             87.397.681                         Article 4 (2)
Pajak Pertambahan Nilai                       730.701.167            905.160.249                      Value Added Tax
Sub Total                                     878.521.253          1.029.195.594                              Sub Total
Total                                       1.057.289.500          1.250.728.187                                 Total




                                                           104

Page 114
PT WIJAYA KARYA (PERSERO) Tbk                                               PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                         AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                      NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                  FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                     For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                              June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                            And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                           Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                         (In Thousand Rupiah, unless Otherwise Stated)

b. Utang Pajak                                                                                b.    Taxes Payable
                                             2026                  2025
                                              Rp                    Rp
Perusahaan                                                                                                 Company
Pajak Penghasilan                                                                                      Income Taxes
  Pasal 15                                         26.400                18.141                          Article 15
  Pasal 21                                      5.010.536             2.147.219                          Article 21
  Pasal 22                                        911.584             5.608.186                          Article 22
  Pasal 23                                        835.909             1.202.462                          Article 23
  Pasal 26                                         37.060                 5.800                          Article 26
  Pasal 29                                     16.835.329            39.176.723                          Article 29
  Pasal 4 (2)                                   2.316.340             9.263.922                        Article 4 (2)
Pajak Pertambahan Nilai                         3.413.115            40.452.361                     Value Added Tax
Sub Total                                      29.386.273            97.874.814                             Sub Total
Entitas Anak                                                                                            Subsidiaries
Pajak Penghasilan                                                                                      Income Taxes
  Pasal 21                                     33.524.964            21.845.995                          Article 21
  Pasal 22                                      2.613.001             2.277.366                          Article 22
  Pasal 23                                     13.755.439            24.513.947                          Article 23
  Pasal 25                                        493.009               329.837                          Article 25
  Pasal 26                                        255.807               195.107                          Article 26
  Pasal 29                                      4.086.272             6.278.876                          Article 29
  Pasal 4 (2)                                 149.617.230           175.229.310                        Article 4 (2)
  Final                                        16.663.988             1.427.605                                Final
Pajak Pertambahan Nilai                        51.727.925            26.956.768                     Value Added Tax
PB-1                                            5.401.802             6.296.092                                  PB-1
Sub Total                                     278.139.437           265.350.903                             Sub Total
Total                                         307.525.710           363.225.717                                 Total


c. Beban Pajak Penghasilan                                                             c.   Income Tax Expense
                                             2026                  2025
                                              Rp                    Rp
Pajak Kini                                                                                               Current Tax
  Perusahaan                                            --               (9.688)                     The Company
  Entitas Anak                                 (3.096.105)           (3.180.538)                      Subsidiaries
  Sub total                                    (3.096.105)           (3.190.226)                         Sub total
Pajak Tangguhan                                                                                         Deferred Tax
  Entitas Anak                                 (3.454.732)          (10.922.388)                       Subsidiaries
Total                                          (6.550.837)          (14.112.614)                                Total


d. Surat Ketetapan Pajak                                                             d. Tax Assessment Letter
WIKA IKON                                                                                         WIKA IKON
Pada Desember 2025, WIKA IKON menerima Surat                 In December 2025, WIKA IKON received an
Ketetapan Pajak Lebih Bayar (SKPLB) Pajak                    Overpayment Tax Assessment Letter (SKPLB) for
Penghasilan Badan untuk tahun pajak 2021                     Corporate Income Tax amounting to Rp8,176,204
sebesar Rp8.176.204. WIKA IKON sudah menerima                for the 2021 tax years. WIKA IKON has received for
atas lebih bayar tersebut.                                   the overpayment.




                                                           105

Page 115
PT WIJAYA KARYA (PERSERO) Tbk                                                 PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                           AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                    FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                       For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                              And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                             Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                           (In Thousand Rupiah, unless Otherwise Stated)
Pada Desember 2025, WIKA IKON menerima Surat                  In December 2025, WIKA IKON received Tax
Ketetapan Pajak Kurang Bayar (SKPKB) PPh 21,                  Underpayment Assesment Letter (SKPKB) Art 21,
PPh 23, dan PPh 4(2) untuk tahun pajak 2021                   Art 23 and Art 4(2) for fiscal year 2021 amounted to
sebesar Rp173.284. WIKA IKON sudah membayar                   Rp173,284.     WIKA        IKON     has   paid   the
atas kurang bayar tersebut.                                   underpayment.

WIKA Realty                                                                                          WIKA Realty
Pada tahun 2025, WIKA Realty menerima Surat                   For year 2025, WIKA Realty received Tax Collection
Tagihan Pajak PPh 21, PPh 23, PPh 25, PPh 4(2),               Letter Art 21, Art 23, Art 25, Art 4(2) and VAT for
dan PPN untuk tahun pajak 2024 dan 2025 sebesar               fiscal year 2024 and 2025 amounted to
Rp2.647.240. WIKA Realty sudah membayar atas                  Rp2,647,240. WIKA Realty has paid the
kurang bayar tersebut.                                        underpayment.

e. Pajak Tangguhan                                                                                   e. Deferred Tax
Pajak Tangguhan dihitung berdasarkan beda waktu               Deferred tax is calculated based on temporary
antara nilai tercatat dari total aset dan liabilitas yang     differences between the carrying value of the total
dicatat berdasarkan laporan keuangan dengan                   assets and liabilities are recorded based on the
dasar pengenaan pajak atas aset dan liabilitas.               financial statements and the tax bases of assets and
Rincian aset pajak tangguhan dan liabilitas pajak             liabilities. Details of deferred tax assets and deferred
tangguhan adalah sebagai berikut:                             tax liabilities are as follows:

                                              2026                   2025
                                               Rp                     Rp
Aset Pajak Tangguhan                                                                             Deferred Tax Assets
 Perusahaan
  Entitas Anak                                                                                           Subsidiaries
    WIKA Beton                                   6.033.105                      --                      WIKA Beton
    WIKA Realty                                  3.017.966              2.891.762                       WIKA Realty
    WIKA Rekayasa Konstruksi                     3.200.312              3.200.311          WIKA Rekayasa Konstruksi
    WIKA Bitumen                                18.744.488             18.744.488                     WIKA Bitumen
    WIKA Tirta Jaya Jatiluhur                      358.171                358.171           WIKA Tirta Jaya Jatiluhur
  Total                                         31.354.041             25.194.732                                 Total

Liabilitas Pajak Tangguhan                                                                     Deferred Tax Liabilities
  Perusahaan
  Entitas Anak                                                                                            Subsidiaries
    WIKA Serang Panimbang                       55.781.301             50.894.829           WIKA Serang Panimbang
    WIKA Realty                                 42.362.104             42.362.103        WIKA Realty and Subsidiaries
    WIKA Industri dan Konstruksi                16.163.777             16.163.777        WIKA Industri dan Konstruksi
    WIKA Beton                                   4.817.766                216.401                        WIKA Beton
  Total                                        119.124.948            109.637.110                                 Total

30.   Uang Muka Dari Pelanggan                                         30. Advances Received From Customers

                                                                                  2026                    2025
                                                                                   Rp                      Rp
WIKA Realty                                                                        857.950.648             858.303.928
WIKA Beton                                                                         230.111.554             200.159.726
WIKA IKON                                                                           35.841.005              23.845.565
WIKA Gedung                                                                         30.926.433              13.198.112
WIKA REKON                                                                          21.455.800              36.283.683
Perusahaan/ the Company                                                             11.781.496              13.314.700
KSO WIKA-WR Laswi                                                                    4.056.888               2.927.922
Sub Total                                                                        1.192.123.824           1.148.033.636
Bagian Jangka Pendek/ Current Portion                                          (1.019.652.833)           (945.292.390)
Bagian Jangka Panjang/ Non Current Portion                                         172.470.991             202.741.246



                                                            106

Page 116
PT WIJAYA KARYA (PERSERO) Tbk                                                PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                          AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                       NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                   FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                      For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                               June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                             And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                            Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                          (In Thousand Rupiah, unless Otherwise Stated)
Uang muka WIKA Realty merupakan uang muka                    Advances of WIKA Realty represent advances from
atas penjualan real estate dan jasa konstruksi yang          sale of real estate and construction services received
diterima dari konsumen dan pemberi kerja, namun              from customers and employers, but not yet qualified
belum memenuhi syarat pengakuan penjualan.                   to be recognized as sales.

Uang muka Perusahaan, WIKA Beton, WIKA                       Advances of the Company, WIKA Beton, WIKA
Gedung, WIKA REKON, WIKA IKON, dan KSO                       Gedung, WIKA REKON, WIKA IKON, and KSO
WIKA-WR Laswi merupakan uang muka yang                       WIKA-WR Laswi represent advances from customers
diterima dari pembeli berdasarkan kontrak dan akan           based on contract and will be deducted on a periodic
dikurangi secara periodik dengan tagihan progres.            basis with progress billing.

31.   Beban Akrual                                                                          31. Accrued Expenses
                                             2026                   2025
                                              Rp                     Rp

Biaya Usaha                                 1.662.120.500          2.362.775.480                 Operating Expenses
Biaya Produksi                              2.173.147.250          1.276.403.404                Production Expenses
Biaya Pemeliharaan                            468.788.024            327.680.637               Maintenance Expenses
Retensi                                       238.310.397            265.187.226                             Retention
Biaya Distribusi                              101.726.844            233.192.185                Distribution Expenses
Cadangan Pajak
  Penghasilan Final                           223.004.498            163.293.641             Accrued Final Income Tax
Biaya Pengelolaan                              59.755.358             96.414.314               Management Expenses
Biaya Pengadaan                                13.232.488             14.164.154                    Logistic Expenses
Lain-lain                                     246.911.482            289.806.853                               Others
Total                                       5.186.996.841          5.028.917.894                                 Total

Biaya produksi yang masih harus dibayar                      Accrued production expenses represent amount
merupakan biaya yang belum ditagihkan oleh pihak             outstanding from third parties or project workers
ketiga maupun tenaga kerja proyek sehubungan                 regarding to the field work.
dengan pelaksanaan pekerjaan di lapangan.

Biaya usaha yang masih harus dibayar merupakan               Accrued operating expenses represent obligation
liabilitas yang belum ditagihkan oleh pihak ketiga           which were not yet billed from third party referring to
sehubungan      dengan     aktivitas umum     dan            the Group’s public activity and administration.
administrasi Grup.

Biaya distribusi yang masih harus dibayar                    Accrued distribution expenses represent costs for the
merupakan biaya atas distribusi produk WIKA Beton            product distribution of WIKA Beton and WIKA IKON.
dan produk WIKA IKON.

32.   Pendapatan Diterima di Muka                                                        32. Unearned Revenues

                                             2026                   2025
                                              Rp                     Rp
Beton dan Beton Pracetak                      118.147.838             61.762.760       Concrete and Precast Concrete
Jasa Konstruksi                                24.508.389             44.905.330                Construction Services
Penjualan Properti                              1.512.136                339.854                   Sales of Property
Total                                         144.168.363            107.007.944                                Total


Beton dan beton pracetak merupakan kewajiban                 Concrete and precast concrete is delivery order
pengiriman    pesanan    yang   harus dipenuhi               performance obligations in connection with bills to
sehubungan dengan tagihan kepada pelanggan                   customers that has been implemented and has not
telah dilaksanakan dan belum memenuhi kriteria               yet met the criteria for recognition of sales from
pengakuan penjualan dari WIKA Beton.                         WIKA Beton.

                                                           107

Page 117
PT WIJAYA KARYA (PERSERO) Tbk                                                                PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                          AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                       NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                                   FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                                        For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                                 June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                                               And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                                              Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                                            (In Thousand Rupiah, unless Otherwise Stated)

Jasa konstruksi merupakan kewajiban prestasi dari                          A construction service is performance liabilities from
WIKA IKON dan WIKA Beton.                                                  WIKA IKON and WIKA Beton.

Penjualan properti merupakan uang muka dari                                Sales of property are unearned revenue from WIKA
pelanggan WIKA Realty.                                                     Realty’s customers.

33.     Pinjaman Jangka Menengah                                                                                   33. Medium Term Notes

                                                        2026                        2025
                                                         Rp                          Rp
Surat Utang Jangka Menengah                           1.612.500.000               1.625.000.000                      Medium Term Notes
Bagian Jangka Pendek yang Jatuh                                                                               Current Maturities of Medium
  Tempo dalam Satu Tahun                                (67.500.000)                (80.000.000)                             Term Notes
Pinjaman Jangka Menengah                                                                                    Long Term Portion of Medium
  Jangka Panjang                                      1.545.000.000               1.545.000.000                             Term Notes


WIKA Realty dan Entitas Anak                                               WIKA Realty and Subsidiary
Berdasarkan Akta Notaris Vita Cahyojati, S.H.,                             Based on the Notarial Deed of Vita Cahyojati, S.H.,
M.Hum. No. 9 dan No. 10 pada tanggal 26 Februari                           M.Hum No. 9 and No. 10 dated on February 26,
2024 terdapat perpanjangan atas MTN IX Wika                                2024 there was an extension of the MTN IX Wika
Realty Tahun 2019 dan Obligasi dengan Opsi                                 Realty Tahun 2019 and Obligasi dengan Opsi
Konversi I masing-masing menjadi 28 Agustus 2029                           Konversi I to Agustus 28, 2029 dan Desember 20,
dan 20 Desember 2028.                                                      2028, respectively.

Berdasarkan Addendum III No. 8 tanggal 25 Juli                             Based on Addendum III No. 8 dated July 25, 2023
2023 dibuat di hadapan Vita Cahyojati, S.H., M.Kn.,                        made before Vita Cahyojati, S.H., M.Kn., Notary in
Notaris di Kota Jakarta Selatan, menyatakan                                the City of South Jakarta, declared an extension of
perpanjangan atas pelunasan pokok atas MTN VIII                            the principal repayment of MTN VIII WIKA Realty to
WIKA Realty menjadi 26 Juli 2028.                                          July 26, 2028.

Berdasarkan Surat No: S-223/PNIM-DIR/INVVI/22                              Based on Letter No: S-223/PNIM-DIR/INVVI/22
tanggal 28 Juni 2022 perihal permohonan                                    dated June 28, 2022 regarding the application for
restrukturisasi penundaan pembayaran MTN IV                                restructuring the postponement of MTN IV Hotel
Hotel Indonesia Natour menjadi tanggal 28 Juli                             Indonesia Natour payments to July 28, 2024.
2024.

Rincian dari MTN per tanggal 30 Juni 2026 adalah                           Details of MTN as of June 30, 2026 are as follows:
sebagai berikut:
                                                                       2026
                   Uraian / Description                  Rating/          Wali Amanat/          Jatuh Tempo/          Tingkat bunga/         Pokok/
                                                         Rating             Trustee               Maturity             Interest rate        Principal

Obligasi dengan Opsi Konversi I                           irCCC            Bank BJB           20 Des / Dec 2038          11,20%               945.000.000
MTN IX Wika Realty Tahun 2019                             irCCC            Bank BJB           28 Agu / Aug 2029          12,00%               495.000.000
MTN VIII Wika Realty Tahun 2019                              --           Bank Bukopin         26 Jul / Jul 2028         12,00%               172.500.000
                                                                                                                                            1.612.500.000


Rincian dari MTN per tanggal 31 Desember 2025                              Details of MTN as of December 31, 2025 are as
adalah sebagai berikut:                                                    follows:
             Keterangan/                  Rating/    Pokok/         Tanggal Penerbitan/      Jatuh Tempo/          Tingkat Bunga/      Total Bunga/
             Description                  Rating    Principal         Issuance Date            Due Date             Interest Rate      Total Interest
MTN VIII Wika Realty Tahun 2019             --        185.000.000      24 Juli 2019/          26 Juli 2028/               12,00%            141.000.000
                                                                       July 24, 2019          July 26, 2028
MTN IX Wika Realty Tahun 2019             irCCC       495.000.000    23 Agustus 2019/       28 Agustus 2029/              12,00%            261.600.000
                                                                     August 23, 2019        August 28, 2029
Obligasi dengan Opsi Konversi I           irCCC       945.000.000   19 Desember 2019/      20 Desember 2028/              11,20%            396.730.556
                                                                    December 19, 2019      December 20, 2028
Total                                               1.625.000.000                                                                           799.330.556


                                                                      108

Page 118
PT WIJAYA KARYA (PERSERO) Tbk                                                       PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                 AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                              NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                          FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                           For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                    June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                                  And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                                 Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                               (In Thousand Rupiah, unless Otherwise Stated)
Pihak-pihak yang terlibat dalam penerbitan MTN                   The parties involved in the issuance of MTN are as
sebagai berikut:                                                 follows:
                                                                        Perusahaan
                  Keterangan/                 Wali Amanat/              Pemeringkat/         Underwriter/           Notaris/
                  Description                   Trustee                Rating Company        Underwriter             Notary

MTN VIII Wika Realty Tahun 2019       PT Bank Bukopin Tbk                    --         PT Asta Kapital Asia   Arry Soepratno, S.H.
MTN IX Wika Realty Tahun 2019         PT Bank Pembangunan Jawa           PT Pefindo     PT Ciptadana Capital   Arry Soepratno, S.H.
                                      Barat dan Banten Tbk
Obligasi dengan Opsi Konversi I       PT Bank Pembangunan Jawa               --         PT Bahana Sekuritas    Arry Soepratno, S.H.
                                      Barat dan Banten Tbk


Pinjaman ini dijamin dengan:                                     Collateral for this loan:
1. Pada Utang MTN VIII ada jaminan fidusia dari                  1. On MTN VIII Loan there is fiduciary guarantee
    piutang penjualan (Catatan 6); dan                              from sales receivables (Note 6); and
2. Pada Utang MTN IX tidak ada jaminan fidusia                   2. On MTN IX Loan there is no fiduciary guarantee
    dari piutang penjualan (bersifat Clean Basis);                  from sales receivables (is Clean Base);

WIKA Realty wajib memenuhi kewajiban keuangan                      WIKA Realty is required to meet financial obligations
dalam akta penerbitan Utang MTN VIII berupa:                       in the Deed of issuance of MTN VIII in the form of:
1. Current Ratio minimal sebesar 100%;                             1. Current Ratio is at least 100%;
2. Rasio Total kewajiban terhadap total ekuitas                    2. Ratio of Total liabilities to total equity (Debt to
   (Debt to Equity Ratio) tidak lebih dari dua                         Equity Ratio) is not more than two to one (2:1);
   berbanding satu (2:1); dan                                          and
3. Rasio EBITDA terhadap beban keuangan bersih                     3. The ratio of EBITDA to net financial expenses
   (EBITDA Coverage Ratio) tidak kurang dari satu                      (EBITDA Coverage Ratio) is not less than one
   koma lima berbanding satu (1,5:1).                                  point five to one (1.5:1).

WIKA Realty wajib memenuhi kewajiban keuangan                      WIKA Realty is required to meet financial obligations
dalam akta penerbitan utang MTN IX berupa:                         in the Deed of issuance of MTN IX in the form of:
1. Current Ratio minimal sebesar 100%;                              1. Current Ratio is at least 100%;
2. Rasio Total kewajiban terhadap total ekuitas                     2. Ratio of Total liabilities to total equity (Debt to
   (Debt to Equity Ratio) tidak lebih dari dua                         Equity Ratio) is not more than two to one (3:1);
   berbanding satu (3:1); dan                                          and
3. Rasio EBITDA terhadap beban keuangan bersih                      3. The ratio of EBITDA to net financial expenses
   (EBITDA Coverage Ratio) menjadi minimal 1,0.                        (EBITDA Coverage Ratio) is at least 1.0.

Berdasarkan Akta Addendum II Nomor 15 tanggal                      Based on Addendum Deed II No. 15 dated
19 November 2025, tentang penerbitan dan                           November 19, 2025, concerning the issuance and
penunjukan agen pemantau MTN IX WIKA Realty                        appointment of the monitoring agent for MTN IX
tahun 2019, telah disetujui pengesampingan                         WIKA Realty 2019, a waiver of the financial
terhadap ketentutan kewajiban keuangan untuk                       covenant requirements for the audited financial
laporan audit 31 Desember 2025.                                    statements as of December 31, 2025 has been
                                                                   approved.

WIKA Realty wajib memenuhi kewajiban keuangan                      WIKA Realty is required to meet financial obligations
dalam akta penerbitan Utang Obligasi dengan Opsi                   in the Deed of issuance of Bonds Payable with
Konversi I berupa:                                                 Convertible Option I in the form of:
1. Current Ratio minimal sebesar 100%;                             1. Current Ratio is at least 100%;
2. Rasio Total kewajiban terhadap total ekuitas                    2. Ratio of Total liabilities to total equity (Debt to
   (Debt to Equity Ratio) tidak lebih dari tiga                       Equity Ratio) is not more than three to one (3:1);
   berbanding satu (3:1); dan                                         and
3. Rasio EBITDA terhadap beban keuangan bersih                     3. The ratio of EBITDA to net financial expenses
   (EBITDA Coverage Ratio) menjadi minimal 1,1.                       (EBITDA Coverage Ratio) is at least 1.1.



                                                             109

Page 119
PT WIJAYA KARYA (PERSERO) Tbk                                                   PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                             AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                          NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                      FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                         For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                  June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                                And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                               Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                             (In Thousand Rupiah, unless Otherwise Stated)
Pemakaian dana dari Medium Term Notes ini                        Use of funds from the Medium Term Notes is
diperuntukkan sebagai pemakaian modal kerja                      intended as the use of working capital for the
pembangunan kawasan realty.                                      construction of the Realty area.


Pembatasan yang dipersyaratkan dalam kontrak                     The restrictions required in the MTN issuance
penerbitan MTN sebagai berikut:                                  contract are as follows:
1. WIKA Realty tidak dapat menjamin pinjaman                     1. WIKA Realty cannot guarantee loans to other
   kepada pihak lain tanpa persetujuan Bank BJB;                    parties without Bank BJB approval;
2. WIKA Realty tidak dapat menjaminkan harta                     2. WIKA Realty cannot pledge assets to a third
   kekayaan      kepada     pihak    ketiga    kecuali              party unless 1) has been previously pledged, 2)
   1) sudah dijaminkan sebelumnya, 2) jaminan                       guarantee inrespect of daily activities, 3) assets
   sehubungan kegiatan sehari-hari, 3) harta                        pledged for refinancing without Bank BJB
   kekayaan yang dijaminkan untuk refinancing                       requirements;
   tanpa persyaratan Bank BJB;
3. WIKA Realty tidak dapat memberikan corporate                  3. WIKA Realty cannot provide corporate guarantee
   guarantee kecuali untuk kegiatan usaha dan                       except for business activities and subsidiaries;
   entitas anak;
4. Melakukan penggabungan yang menyebabkan                       4. Merge which causes the Issuer to discharge or
   bubarnya Penerbit atau mempunyai akibat                          has a negative effect on the ability to perform the
   negatif terhadap kemampuan melaksanakan                          Issuer's obligations;
   kewajiban Penerbit;
5. Menjual        atau        mengalihkan        atau            5. Selling or transfer in any way the Fixed assets of
   memindahtangankan dengan cara apapun aset                        the Issuer as much as more than 50% (fifty
   tetap Penerbit sebanyak lebih dari 50% (lima                     percent) of the fixed assets, both existing and will
   puluh persen) dari aset tetap, baik yang telah ada               exist in the future to third parties; and
   maupun yang akan ada dikemudian hari kepada
   pihak ketiga; dan
6. Mengubah bidang usaha utama Penerbit.                         6. Changes main business of the Publisher.

34.   Liabilitas Imbalan Kerja                                                     34. Employee Benefit Liabilities
                                             2026                      2025
                                              Rp                        Rp
Imbalan Pascakerja                            324.578.532               268.105.479            Post-employment Benefits
Imbalan Kerja                                                                                          Other Long-Term
  Jangka Panjang Lainnya                        7.694.996                66.857.824                 Employee Benefits
Total                                         332.273.528               334.963.303                               Total


Imbalan Pascakerja                                           Post-Employment Benefits
Grup menyelenggarakan program pensiun manfaat                The Group established defined benefit pension plan
pasti  untuk   karyawan   tetap,  berdasarkan                for permanent employees, based on years of service
penghasilan dasar pensiun dan masa kerja                     and salaries of the employees.
karyawan.
Pendanaan atas program pensiun ini dikelola oleh             Funding for this pension program is managed by the
Dana Pensiun Wijaya Karya, Dana Pensiun Aero                 Dana Pensiun Wijaya Karya, Dana Pensiun Aero
Wisata, Dana Pensiun Hotel Indonesia, dan Dana               Wisata, Dana Pensiun Hotel Indonesia and Dana
Pensiun Natour. Selain itu Perusahaan dan SPI juga           Pensiun Natour. In addition, the Company and SPI
menyelenggarakan program imbalan pascakerja                  also provide other post-employment benefit
lainnya. Perusahaan menyiapkan dana untuk                    programs. The Company provides funds for this
program ini yang dikelola oleh Koperasi Karyawan             program which is managed by the Koperasi
PT Wijaya Karya, sementara SPI dikelola oleh Dana            Karyawan PT Wijaya Karya, while SPI is managed
Pensiun Aero Wisata.                                         by Dana Pensiun Aero Wisata.



                                                           110

Page 120
PT WIJAYA KARYA (PERSERO) Tbk                                                PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                          AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                       NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                   FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                     For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                              June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                            And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                           Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                         (In Thousand Rupiah, unless Otherwise Stated)
Liabilitas imbalan pascakerja yang termasuk dalam            Post-employment benefits liabilities included in the
laporan posisi keuangan konsolidasian adalah                 consolidated statement of financial position are as
sebagai berikut:                                             follows:

                                             2026                  2025
                                              Rp                    Rp
Nilai Kini                                                                                              Current Value
  Liabilitas Imbalan Pascakerja             1.125.290.065          1.068.817.012        Post-employment Benefits
Nilai Wajar Aset Program                    (813.709.162)          (813.709.162)        Fair Value of Asset Program
Defisit                                       311.580.903            255.107.850                               Deficit
Dampak Batas Atas Aset                         12.997.629             12.997.629               Effect of Asset Ceiling
Liabilitas Bersih Akhir Tahun                 324.578.532            268.105.479      End of the Year Net Liabilities


Mutasi liabilitas imbalan pascakerja adalah sebagai          Movements in post-employment benefits liabilities
berikut:                                                     are as follow:
                                             2026                   2025
                                              Rp                     Rp
Saldo Awal                                    268.105.479           205.804.769                   Beginning Balance
Beban Imbalan                                                                              Post-employment Benefits
 Pascakerja                                     80.687.777            86.515.434                         Expense
Pembayaran Manfaat                            (68.771.862)          (68.771.862)                       Benefits Paid
Pengukuran Kembali Atas                                                                   Remeasurement on Defined
 Program Imbalan Pasti                         44.557.138            44.557.138                      Benefit Plans
Saldo Akhir                                   324.578.532           268.105.479                    Ending Balance

Mutasi nilai wajar aset program adalah sebagai               Movements in the fair value of the plan assets were
berikut:                                                     as follows:
                                             2026                  2025
                                              Rp                    Rp
Saldo Awal Nilai Wajar
  Aset Program                                863.086.616            863.086.616       Fair Value of Asset - Beginning
Kontribusi-Pemberi Kerja                       35.748.041             35.748.041                Contribution-Employer
Kontribusi-Pegawai                              6.524.175              6.524.175               Contribution-Employee
Penyesuaian                                    13.034.574             13.034.574                           Adjustment
Imbal Hasil Aset Program                       39.102.325             39.102.325        Interest Income on plan asset
Perubahan Pengaruh Aset                      (43.579.601)           (43.579.601)          Remeasurement gain (loss)
Pembayaran Manfaat                          (100.206.968)          (100.206.968)                         Benefits paid
Saldo Akhir Nilai
  Wajar Aset Program                          813.709.162           813.709.162         Fair Value of Asset - Ending


Beban imbalan pascakerja yang diakui laba rugi               Post-employment benefits expenses which are
adalah sebagai berikut:                                      recognized in profit or loss are as follows:

                                             2026                  2025
                                              Rp                    Rp
Biaya Jasa Kini                                23.166.785            23.166.785                Current Service Cost
Biaya Jasa Lalu                              (10.988.204)            (5.160.547)                 Past Service Cost
Biaya Bunga                                    68.509.196            68.509.196                        Interest Cost
                                                                                         Post-Employment Benefits
Beban Imbalan Pascakerja                       80.687.777            86.515.434                          Expense

Analisis jatuh tempo yang diharapkan dari manfaat            Expected maturity analysis of undiscounted pension
pensiun yang tidak didiskonto adalah sebagai                 benefits is as follows:
berikut:
                                                           111

Page 121
PT WIJAYA KARYA (PERSERO) Tbk                                                    PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                              AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                           NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                       FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                         For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                  June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                                And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                               Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                             (In Thousand Rupiah, unless Otherwise Stated)

                                                 Dalam 1 Tahun/                 2 - 5 Tahun/            Diatas 5 Tahun/
                                                 Within 1 Years                 2 - 5 Years              Over 5 Years
                                                       Rp                            Rp                       Rp
Manfaat Pasti/ Defined Benefit                          123.588.402                  542.813.148             6.727.052.518

Program Imbalan Kerja Jangka Panjang Lainnya                   Other Long-term Employee Benefit Program
Grup memberikan imbalan kerja jangka panjang                   The Group provides other long-term benefit in form of
lainnya berupa tunjangan cuti besar dan satya karya.           long service leave and long service award.
Grup memberikan ekstra hari cuti dan ekstra uang               The Group provides extra leave and extra leave
cuti untuk karyawan aktif setiap kelipatan 5 tahun             allowance for active employee every 5 years of
masa kerja. Grup memberikan penghargaan satya                  service. The Group provides long leave award to
karya kepada karyawan yang telah mencapai masa                 employee that reached certain year of service.
kerja tertentu.
Liabilitas imbalan jangka panjang lainnya Grup yang            The Group's other long-term benefits liabilities
termasuk      dalam    laporan   posisi   keuangan             included in the consolidated statement of financial
konsolidasian adalah sebagai berikut:                          position are as follows:
                                              2026                      2025
                                               Rp                        Rp
Saldo Awal                                       2.446.763                          -                    Beginning Balance
Beban Imbalan Kerja Jangka                                                                      Other Long-Term Employee
 Panjang Lainnya                                 17.484.688               17.484.688                    Benefits Expense
Pembayaran Manfaat                             (15.037.925)             (15.037.925)                          Benefits Paid
Saldo Akhir                                       4.893.526                2.446.763                      Ending Balance

Beban imbalan jangka panjang lainnya yang diakui               Other long-term benefits expenses which                 are
laba rugi adalah sebagai berikut:                              recognized in profit or loss are as follows:

                                              2026                      2025
                                               Rp                        Rp
Biaya Jasa Kini                                  4.516.212                4.516.212                  Current Service Cost
Biaya Jasa Lalu                                    (98.607)                 (98.607)                   Past Service Cost
Biaya Bunga                                      4.402.071                4.402.071                          Interest Cost
Pengukuran Kembali Atas Program                                                                Remeasurement on Defined
  Imbalan Pasti                                  8.665.012                8.665.012                       Benefit Plans
Total                                           17.484.688               17.484.688                                  Total

Analisis jatuh tempo yang diharapkan dari manfaat              Expected maturity analysis of undiscounted pension
pensiun yang tidak didiskonto adalah sebagai                   benefit is as follows:
berikut:
                                                 Dalam 1 Tahun/                 2 - 5 Tahun/           Diatas 5 Tahun/
                                                 Within 1 Years                 2 - 5 Years             Over 5 Years
                                                       Rp                            Rp                      Rp
Manfaat Pasti/ Defined Benefit                             18.164.908                   72.677.206            842.067.361

Program pensiun imbalan pascakerja dan imbalan                 The post-employment benefits and other long-term
jangka panjang lainnya memberikan eksposur Grup                benefits typically expose the Group to actuarial risks
terhadap risiko aktuarial seperti risiko investasi, risiko     such as: investment risk, interest rate risk, longevity
tingkat bunga, risiko harapan hidup dan risiko gaji.           risk and salary risk.

Risiko Investasi                                               Investment Risk
Nilai kini kewajiban imbalan pasti dihitung                    The present value of the defined benefit plan liability
menggunakan tingkat diskonto yang ditetapkan                   is calculated using a discount rate determined by
dengan mengacu pada imbal hasil obligasi                       reference to high quality government bond yields; if
                                                             112

Page 122
PT WIJAYA KARYA (PERSERO) Tbk                                                 PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                           AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                    FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                        For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                 June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                               And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                              Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                            (In Thousand Rupiah, unless Otherwise Stated)
pemerintah berkualitas tinggi; jika pengembalian aset          the return on plan asset is below this rate, it will
program di bawah tingkat tersebut, hal itu akan                create a plan deficit. Currently the program has
mengakibatkan defisit program. Saat ini program                investment in deposits in bank, shares, gold
tersebut memiliki investasi pada deposito di bank,             investment, real estate, debt investments, and
investasi saham, emas, real estat, investasi obligasi,         others. Due to the long-term nature of the plan
dan lain-lain. Karena sifat jangka panjang dari                liabilities, the board of the pension fund considers it
liabilitas program, dewan dana pensiun perlu                   appropriate that a reasonable portion of the plan
menetapkan bahwa bagian wajar dari aset program                assets should be invested in equity securities and in
harus diinvestasikan pada efek ekuitas dan real estat          real estate to leverage the return generated by the
untuk meningkatkan imbal hasil yang dihasilkan oleh            fund.
dana.

Risiko Tingkat Bunga                                           Interest Risk
Penurunan suku bunga obligasi akan meningkatkan                A decrease in the bond interest rate will increase the
liabilitas program; namun, sebagian akan di offset             plan liability; however, this will be partially offset by
(saling hapus) oleh peningkatan imbal hasil atas               an increase in the return on the plan’s debt
investasi instrumen utang.                                     investments.

Risiko Harapan Hidup                                           Longevity Risk
Nilai kini kewajiban imbalan pasti dihitung dengan             The present value of the defined benefit plan liability
mengacu pada estimasi terbaik dari mortalitas                  is calculated by reference to the best estimate of the
peserta program baik selama kontrak kerja.                     mortality of plan participants during their
Peningkatan harapan hidup peserta program akan                 employment. An increase in the life expectancy of
meningkatkan liabilitas program.                               the plan participants will increase the plan’s liability.

Risiko Gaji                                                    Salary Risk
Nilai kini kewajiban imbalan pasti dihitung dengan             The present value of the defined benefit plan liability
mengacu pada gaji masa depan peserta program.                  is calculated by reference to the future salaries of
Dengan demikian, kenaikan gaji peserta program                 plan participants. As such, an increase in the salary
akan meningkatkan liabilitas program itu.                      of the plan participants will increase the plan’s
                                                               liability.

Asumsi aktuarial yang signifikan untuk penentuan               Significant    actuarial   assumptions      for   the
kewajiban imbalan pasti adalah tingkat diskonto,               determination of the defined benefits obligation are
kenaikan gaji yang diharapkan dan mortalitas.                  discount rate, expected salary increase and mortality.
Sensitivitas analisis di bawah ini ditentukan                  The sensitivity analyses below had been determined
berdasarkan masing-masing perubahan asumsi yang                based on reasonably possible changes of the
mungkin terjadi pada akhir periode pelaporan,                  respective assumptions occurring at the end of the
dengan semua asumsi lain konstan.                              reporting period, while holding all other assumptions
                                                               constant.

Analisa Sensitivitas                                           Sensitivity Analysis
Sensitivitas dari nilai kini liabilitas imbalan pascakerja     The sensitivity of post-employment benefit and other
dan imbalan jangka panjang lainnya per                         long-term benefits liabilities as of June 30, 2026 to
30 Juni 2026 terhadap perubahan asumsi aktuaria                changes in the actuarial assumptions is as follows:
adalah sebagai berikut:

                                                    Perubahan Asumsi/                 Nilai Kini Kewajiban Imbalan Kerja/
                                                  Changes in Assumption               Present Value of Benefit Obligation
                                                                              Imbalan Pascakerja/            Imbalan Kerja Jangka
                                                                           Post-Employment Benefits             Panjang Lainnya/
                                                                                                                Other Long-Term
                                                                                                               Employee Benefits
Tingkat Diskonto/ Discount Rate                    Kenaikan/Increase 1%                  1.122.257.863                    59.325.079
                                                  Penurunan/Decrease 1%                  1.048.816.323                    75.793.477

Tingkat Kenaikan Gaji/ Salary Increase Rate        Kenaikan/Increase 1%                  1.041.653.257                    75.753.173
                                                  Penurunan/Decrease 1%                  1.138.290.118                    59.259.914



                                                             113

Page 123
PT WIJAYA KARYA (PERSERO) Tbk                                                     PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                               AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                            NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                        FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                             For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                      June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                                    And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                                   Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                                 (In Thousand Rupiah, unless Otherwise Stated)
Perhitungan imbalan pascakerja dan imbalan kerja                    The calculation of post-employment benefits and
jangka panjang lainnya untuk tahun yang berakhir                    other long-term employee benefits for the years
pada 31 Desember 2025 dihitung oleh aktuaris                        ended December 31, 2025 is calculated by
independen KKA Tubagus Syafrial dan Amran                           independent actuaries KKA Tubagus Syafrial dan
Nangasan. Asumsi utama yang digunakan dalam                         Amran Nangasan. The main assumptions used in
menentukan penilaian aktuaris adalah sebagai                        determining actuarial valuations are as follows:
berikut:

                                                                 2025
                                                                  Rp

               Tingkat Diskonto                            4.58% - 7.06%                         Discount Rate
               Tingkat Kenaikan Gaji                          6.00% p.a.                 Salary Increment Rate
               Tingkat Kematian                                 TMI IV                            Mortality Rate
               Tingkat Cacat                                 10.00% p.a.                         Disability Rate
               Tingkat Pengunduran Diri            18-35 Tahun/ Years : 1% p.a.               Resignation Rate
                                                  36-54 Tahun/ Years : 0.05% p.a.
               Tingkat Pensiun Normal               55, 56, 57, 58 Tahun/ Years        Normal Retirement Rate
               Imbal Hasil Ekspektasian                                                   Expected Return on
                 Aset Program                                  7.09% p.a.                       Plan Assets

35.     Uang Muka Proyek Jangka Panjang                                         35. Advances from Long-term Projects

Uang muka proyek jangka panjang merupakan uang                      Advances from long-term projects represent
muka yang diterima dari pemberi kerja atau pemilik                  advances received from the employer or owner of
proyek atas pekerjaan konstruksi yang memiliki                      the construction project that has completion period of
jangka waktu penyelesaian proyek lebih dari satu                    more than one year. The amount is deducted in
tahun. Jumlah tersebut secara proporsional akan                     proportion based on the physical progress achieved.
dikompensasikan dengan tagihan yang didasarkan                      Details of advances from long-term projects are as
atas kemajuan fisik yang telah dicapai dengan                       follows:
rincian sebagai berikut:
                                                                                            2026                   2025
                                                                                             Rp                     Rp
Proyek/Project Port Malili                                                                   400.000.000                      -
Proyek/Project Darurat Bencana Aceh                                                          102.304.985           102.304.985
Proyek/Project SMA Garuda                                                                     33.795.809                     --
Proyek/Project Tol Harbour Road II Section 1 : Ancol - Pluit                                  28.859.622            41.949.253
Proyek/Project Gedung Bank Mandiri Cabang Masjid Agung                                        24.517.478            33.977.849
Proyek/Project CCSP 3 Shoring                                                                 13.622.549            34.728.757
Proyek/Project Apartemen Nayumi                                                               21.363.636            21.363.636
Proyek/Project Rediversion MWRD Kaltim Prima Coal                                                      --           26.696.474
Proyek/Project CBD Surabaya                                                                            --           26.483.980
Lain-lain (di bawah Rp20.000.000)/
  Others (each below Rp20,000,000)                                                           216.068.392           224.358.110
Total                                                                                        840.532.471           511.863.044


Konsekuensi apabila pekerjaan konstruksi tidak                      Consequences if the construction activites fail to be
dapat diselesaikan tepat waktu adalah denda                         completed in punctual time shall be penalty for the
keterlambatan (yang umumnya sebesar 0,1% dari                       the delay (it shall be generally 0.1% of initial
nilai awal kontrak perhari keterlambatan) sampai                    contracted value per delay day) until maximum of 5%
maksimal 5% dari nilai kontrak awal.                                of initial contracted value.

Pelaksanaan pekerjaan konstruksi saat ini masih                     Implementation of the construction work is still
mengacu pada jadwal pelaksanaan serta perubahan-                    referring to the implementation schedule and the
perubahan yang telah disepakati dengan pemilik                      changes that had been agreed with the owner of the
proyek sehingga kemungkinan denda dapat                             project so that the possibility of fines can be avoided.
                                                                 114

Page 124
PT WIJAYA KARYA (PERSERO) Tbk                                                                    PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                              AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                           NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                                       FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                                         For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                                  June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                                                And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                                               Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                                             (In Thousand Rupiah, unless Otherwise Stated)
dihindari.

36.     Liabilitas Sewa                                                                                                    36. Lease Liabilities
Pembayaran sewa minimum di masa mendatang,                                       Future minimum lease payment, as well as the
serta nilai kini atas pembayaran minimum sewa                                    present value of minimum finance lease payment as
pembiayaan pada tanggal 30 April 2026 dan 31                                     of April 30, 2026 and December 31, 2025 are as
Desember 2025 adalah sebagai berikut:                                            follows:


                                                            2026                       2025
                                                             Rp                         Rp
Rincian Liabilitas Sewa                                                                                                   Lease Liabilities Detail
  Berdasarkan Jatuh Tempo                                                                                                        By Due Date
    Tidak Lebih dari Satu Tahun                                            --           11.265.980                 Not Later than One Year
  Lebih dari Satu Tahun dan                                                                                          Later than One Year and
    Kurang dari Lima Tahun                                      3.605.782                  254.064                not Later than Five Years
  Sub Total                                                     3.605.782               11.520.044                                  Sub Total
  Dikurangi: Biaya Keuangan                                                                                             Less: Future Finance
    Masa Depan                                                             --            (453.667)                                 Charges

   Nilai Kini Pembayaran                                                                                          Present Value of Minimum
     Minimum Sewa                                               3.605.782               11.066.377                        Lease Payments
   Bagian yang Jatuh Tempo                                                                                      Portion that will Mature within
     dalam Waktu Satu Tahun                                                --         (10.815.282)              One Year Current Maturity
   Liabilitas Sewa Jangka                                                                                                  Long-term Lease
     Panjang-Neto                                               3.605.782                  251.095                           Liabilities-Net


Grup mendapat pembiayaan dari PT Astra Credit, PT                                The Group obtained financing from PT Astra Credit,
Bumiputera BOT Finance, PT Mitsubishi UFJ Lease                                  PT Bumiputera BOT Finance, PT Mitsubishi UFJ
& Finance Indonesia, PT Surya Artha Nusantara                                    Lease & Finance Indonesia, PT Surya Artha
Finance, dan PT Astra Sedaya Finance Indonesia                                   Nusantara Finance and PT Astra Sedaya Finance
dengan rincian seperti dibawah ini:                                              Indonesia with details as follows:

WIKA IKON                                                                        WIKA IKON
PT Astra Credit                                                                  PT Astra Credit
Tahun Mulai/               Nomor Kontrak/                Aset Sewaan/ Leased Assets     Total Unit    Periode Sewa/   Suku Bunga/       Total Nilai Kontrak/
Starting Year             Contract Number                                                             Lease Period    Interest Rate   Total Contract Amount
                                                                                                      Tahun/ Years          %                    Rp

        2021    01.100.910.00.200934.3              Excavator Pc210 Super Long Arm             3,00               5            0,09               5.325.000
        2021    01.100.910.00.200940.8              Excavator Pc210                           10,00               5            0,09              13.100.000
        2021    01.100.910.00.210551.2 & 210552.0   Bulldozer D85Ess-2                         4,00              10            0,10              13.300.000



PT BOT Finance Indonesia d/h PT Bumiputera                                       PT   BOT     Finance    Indonesia                           formerly
BOT Finance                                                                      PT Bumiputera BOT Finance
Tahun Mulai/               Nomor Kontrak/                Aset Sewaan/ Leased Assets     Total Unit    Periode Sewa/   Suku Bunga/       Total Nilai Kontrak/
Starting Year             Contract Number                                                             Lease Period    Interest Rate   Total Contract Amount
                                                                                                      Tahun/ Years          %                    Rp

        2020    LJKT-201909-0010                    Excavator 20 Ton                           4,00               5            0,10               5.000.000
        2021    LJKT-202010-0010                    Excavator Pc210 Super Long Arm             6,00               5            0,10              10.650.000
        2021    LJKT-202010-0003                    Excavator Pc210                           10,00               5            0,10              13.100.000
        2021    LJKT-202104-0023                    Excavator Hydraulic                        2,00               5            0,09               4.750.000
        2021    LJKT-202104-0024                    Excavator Hydraulic                        3,00               5            0,09               7.125.000




                                                                            115

Page 125
PT WIJAYA KARYA (PERSERO) Tbk                                                                   PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                             AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                          NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                                      FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                                         For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                                  June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                                                And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                                               Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                                             (In Thousand Rupiah, unless Otherwise Stated)
PT Mitsubishi UFJ Lease & Finance Indonesia                                      PT Mitsubishi UFJ Lease & Finance Indonesia
Tahun Mulai/             Nomor Kontrak/                 Aset Sewaan/ Leased Assets      Total Unit   Periode Sewa/   Suku Bunga/       Total Nilai Kontrak/
Starting Year           Contract Number                                                              Lease Period    Interest Rate   Total Contract Amount
                                                                                                     Tahun/ Years          %                    Rp

        2019    WKI19041387-001                   Trailer 18 Meter                            1,00               5            0,10                 340.000
        2019    WKI19041387-001                   Truck Water Tank                            2,00               5            0,10                 536.364
        2019    WKI19041387-001                   Trailer 12 Meter                            2,00               5            0,10                 540.000
        2019    WKI19041387-001                   Excavator 20 Ton                            4,00               5            0,10               5.000.000
        2019    WKI19041387-001                   Truck Mounted Crane                         4,00               5            0,10               5.049.091
        2020    WKI19041387-002                   Excavator 40 Ton                            2,00               5            0,10               8.160.000
        2021    WKI19041387-003                   Stone Crusher                               1,00              10            0,08               7.115.000
        2021    WKI19041387-005                   Excavator Kobelco Sk330-10                  4,00               5            0,09               9.500.000
        2021    WKI19041387-004                   Bulldozer D85Ess-2                          4,00              10            0,09              13.600.000



PT Surya Artha Nusantara Finance                                                 PT Surya Artha Nusantara Finance
Tahun Mulai/             Nomor Kontrak/                 Aset Sewaan/ Leased Assets      Total Unit   Periode Sewa/   Suku Bunga/       Total Nilai Kontrak/
Starting Year           Contract Number                                                              Lease Period    Interest Rate   Total Contract Amount
                                                                                                     Tahun/ Years          %                    Rp

        2022                        32201000109   Compactor Bw211D-40Sl                       6,00              10            0,09               5.790.000


WTJJ                                                                             WTJJ
PT Astra Sedaya Finance                                                          PT Astra Sedaya Finance
Tahun Mulai/             Nomor Kontrak/                Aset Sewaan/ Leased Assets       Total Unit   Periode Sewa/   Suku Bunga/       Total Nilai Kontrak/
Starting Year           Contract Number                                                              Lease Period    Interest Rate   Total Contract Amount
                                                                                                     Tahun/ Years          %                    Rp

        2023    01100103005488754                 Toyota/ All New Avanza/ 1.5/ CVT            1,00               2            0,07                 269.800


37.     Pinjaman Jangka Panjang                                                                                            37. Long-term Loan

                                                                                                         2026                            2025
                                                                                                          Rp                              Rp
Perusahaan/ the Company
  Pihak Berelasi (Catatan 52)/ Related Parties (Note 52)
    PT Bank Mandiri (Persero) Tbk                                                                       7.547.627.174                  7.931.399.732
    PT Bank Rakyat Indonesia (Persero) Tbk                                                              1.862.556.698                  1.950.147.766
    PT Bank Negara Indonesia (Persero) Tbk                                                              1.720.274.864                  1.807.111.829
    PT Sarana Multi Infrastruktur (Persero)                                                             1.436.643.178                  1.511.339.782
    Lembaga Pembiayaan Ekspor Indonesia - Indonesia Eximbank                                              702.998.964                    737.686.523
    PT Indonesia Infrastructure Finance                                                                   478.880.830                    504.862.565
    PT Bank Syariah Indonesia Tbk                                                                         249.114.100                    261.019.499
    PT Bank Tabungan Negara (Persero) Tbk                                                                 148.453.201                    155.998.804
    Subtotal                                                                                           14.146.549.009                 14.859.566.500

   Pihak Ketiga/ Third Parties
     PT Bank Tabungan Pensiunan Nasional Tbk                                                            1.412.698.793                  1.489.906.733
     PT Bank Pan Indonesia Tbk                                                                            718.322.939                    754.333.922
     PT Bank DKI                                                                                          678.313.946                    711.673.274
     PT Bank Pembangunan Daerah Jawa Barat dan Banten Tbk                                                 502.792.413                    528.660.418
     PT Bank ICBC Indonesia                                                                               171.261.363                    179.309.578
     PT Bank Danamon Tbk                                                                                  120.822.244                    126.164.742
     Subtotal                                                                                           3.604.211.698                  3.790.048.667
     Total                                                                                             17.750.760.707                 18.649.615.167
      Dampak Restrukturisasi Pinjaman yang Belum Diamortisasi/
        Impact of Unamortized Loan Restructuring                                                      (3.944.586.059)                (3.944.586.059)
      Amortisasi Dampak Restrukturisasi Pinjaman/
        Amortized Loan Restructuring Impact                                                             1.362.598.392                  1.126.326.675
                                                                                                       15.168.773.040                 15.831.355.783
Bagian Jangka Pendek dari Pinjaman Jangka Panjang/
  Current Portion of Long Term Loan                                                                                 --                 (602.051.746)
Total Bagian Jangka Panjang / Long Term Portion                                                        15.168.773.040                 15.229.304.037


                                                                            116

Page 126
PT WIJAYA KARYA (PERSERO) Tbk                                              PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                        AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                     NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                 FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                     For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                              June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                            And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                           Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                         (In Thousand Rupiah, unless Otherwise Stated)
                                                                                 2026                    2025
                                                                                  Rp                      Rp
Entitas Anak/ Subsidiaries
  Pihak Berelasi (Catatan 52)/ Related Parties (Note 52)
     Pinjaman Sindikasi Milik WIKA Serpan / Syndicated Loan
     Belong to WIKA Serpan -
       PT Bank Mandiri (Persero) Tbk, PT Bank Syariah Indonesia Tbk,
       PT Bank Negara Indonesia (Persero) Tbk,
       PT Sarana Multi Infrastruktur (Persero)                                  1.942.210.347          1.945.139.774
     Pinjaman Sindikasi Milik WTJJ/ Syndicated Loan Belong to WTJJ -
       PT Bank Mandiri (Persero) Tbk,
       PT Sarana Multi Infrastruktur (Persero)                                  1.214.862.000          1.200.149.915
     PT Bank Mandiri (Persero) Tbk                                                237.374.500            278.317.000
     PT Bank Tabungan Negara (Persero) Tbk                                        160.451.923            171.791.885
     PT Bank Rakyat Indonesia (Persero) Tbk                                        43.611.430             45.141.430
     Subtotal                                                                   3.598.510.200          3.640.540.004
  Pihak Ketiga/ Third Parties
    Pinjaman Sindikasi Milik WIKA Serpan / Syndicated Loan
    Belong to WIKA Serpan -
      PT BPD Jawa Tengah, PT BPD Papua, PT BPD Sumatera Utara
      PT BPD Jawa Barat dan Banten, PT BPD Aceh Syariah,
      PT BPD Sulawesi Selatan dan Sulawesi Barat,
      PT Bank Panin Dubai Syariah Tbk, PT BPD Sumatera
      Utara Syariah, PT BPD Sumatera Utara dan Bangka Belitung
      PT Bank Mestika Dharma Tbk, PT Bank ICBC Indonesia
      BPD Sumatera Utara dan Bangka Belitung Syariah                            2.193.241.290          2.196.549.346
    PT Bank DKI                                                                   159.728.727            162.728.727
    PT Bank Victoria International Tbk                                                      --             2.040.000
    Subtotal                                                                    2.352.970.017          2.361.318.073
    Total                                                                       5.951.480.217          6.001.858.077
    Dampak Restrukturisasi Pinjaman yang Belum Diamortisasi/
      Impact of Unamortized Loan Restructuring                                  (547.529.158)          (547.529.158)
    Amortisasi Dampak Restrukturisasi Pinjaman/
      Amortized Loan Restructuring Impact                                          66.057.737             50.020.353
    Beban Transaksi Keuangan yang Belum Amortisasi/
      Unamortized Financial Transaction Cost                                                --           (16.398.203)
                                                                                5.470.008.796          5.487.951.069
Bagian Jangka Pendek dari Pinjaman Jangka Panjang/
  Current Portion of Long Term Loan                                             (263.327.051)          (277.658.246)
                                                                                5.206.681.745          5.210.292.823
Total Bagian Jangka Panjang / Long Term Portion                                20.375.454.785         20.439.596.860


Perusahaan                                                   The Company
Pinjaman bank jangka panjang Perusahaan                      The Company's long-term bank loans are the result
merupakan hasil restrukturisasi pinjaman bank                of restructuring its short-term bank loans (Note 26),
jangka pendek (Catatan 26), berdasarkan Akta                 based on the Deed of Addendum Agreement and
Perjanjian Addendum dan Pernyataan Kembali                   Restatement of Credit Agreement for Restructuring
Perjanjian Kredit untuk Tujuan Restrukturisasi No.9          Purposes No. 9 dated January 23, 2024 made in
tanggal 23 Januari 2024 yang dibuat di hadapan               presence of Notary Fathiah Helmi, S.H., in Jakarta,
Notaris Fathiah Helmi, S.H., di Jakarta, Perusahaan          the Company and banks and financial institutions
dan bank-bank dan lembaga keuangan melakukan                 signed an addendum agreement and re-inclusion of
menandatanganan       perjanjian   addendum     dan          the credit agreement for the purpose of
penyertaan kembali perjanjian kredit untuk tujuan            restructurisation.
restrukturisasi.

                                                           117

Page 127
PT WIJAYA KARYA (PERSERO) Tbk                                               PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                         AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                      NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                  FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                      For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                               June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                             And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                            Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                          (In Thousand Rupiah, unless Otherwise Stated)
Saldo      pinjaman      jangka     panjang     yang         The balance of the long-term loan restructured
direstrukturisasi sesuai perjanjian tersebut sebesar         according to the agreement is Rp20,798,469,596.
Rp20.798.469.596.

Berdasarkan Akta Perjanjian Adendum No. 14 dan               Based on Addendum Agreement Deeds No. 14 and
15 tanggal 22 Oktober 2025 dan No. 16 tanggal 23             15 dated October 22, 2025 and No. 16 dated October
Oktober 2025 yang dibuat di hadapan Notaris                  23, 2025, drawn up before Notary Fathiah Helmi,
Fathiah Helmi, S.H., di Jakarta, menyatakan                  S.H., in Jakarta, the payment schedule for the
perpanjangan jadwal pembayaran jumlah terutang               outstanding amount of Tranche C was extended to
tranche C menjadi 23 Juni 2026.                              June 23, 2026.

Pengelompokan pembayaran pinjaman bank adalah                The grouping of bank loan payments is as follows:
sebagai berikut:
a. Tranche A sebesar Rp16.263.130.057 jatuh                  a. Tranche A amounting to Rp16,263,130,057 due
   tempo hingga 23 Desember 2031;                               on December 23, 2031;
b. Tranche B sebesar Rp1.630.792.787 jatuh tempo             b. Tranche B amounting to Rp1,630,792,787 due on
   hingga 23 Desember 2029; dan                                 December 23, 2029; and
c. Tranche C sebesar Rp303.956.010 jatuh tempo               c. Tranche C amounting to Rp303,956,010 due on
   hingga 23 Juni 2026.                                         June 23, 2026.

Tingkat suku bunga adalah sebagai berikut:                   The interest rates are as follows:
a. Tranche A dengan bunga 4% per tahun, di mana              a. Tranche A with an interest of 4% per annum,
   0,5% akan dibayarkan secara tunai dan 3,50%                  where 0.5% will be paid in cash and 3.5% will be
   ditanggguhkan sampai dengan 23 Desember                      deferred until December 23, 2031;
   2031;
b. Tranche B dengan bunga 4% per tahun, di mana              b. Tranche B with an interest of 4% per annum,
   0,5% akan dibayarkan secara tunai dan 3,50%                  where 0.5% will be paid in cash and 3.5% will be
   ditanggguhkan sampai dengan 23 Desember                      deferred until December 23, 2029; and
   2029; dan
c. Tranche C tidak dikenakan bunga.                          c. Tranche C is not subject to interest.

Perusahaan diharuskan untuk mematuhi beberapa                The Company is required to comply with several
batasan untuk mempertahankan rasio keuangan                  restrictions to maintain financial ratios as follows:
sebagai berikut:
• Current ratio minimal 1x berlaku pada                      •   Current ratio minimum 1x applies on March 31,
   31 Maret 2024 sampai dengan 30 September                      2024 until September 30, 2031;
   2031;
• Interest Coverage Ratio (ICR) pada tahun 2024              •   Interest Coverage Ratio (ICR) of 2024 to 2027 is
   sampai dengan 2027 belum berlaku, ICR                         not yet effective, ICR minimum 1.2x applies on
   minimum 1,2x berlaku pada tahun 2028 sampai                   2028 until 2029, ICR minimum 1.4 times applies
   dengan 2029, ICR minimum 1,4x berlaku pada                    on 2030 until 2031;
   tahun 2030 sampai dengan 2031;
• Menjaga ekuitas selalu positif; dan                        •   Maintain positive equity; and
• Gearing ratio (GR) maksimum 6x pada tahun                  •   Gearing Ratio (GR) maximum 6x in 2024 to 2027,
   2024 sampai dengan 2027, GR maksimum 5,75x                    GR maximum 5.75x in 2028 to 2029, and GR
   pada tahun 2028 sampai dengan 2029, dan GR                    maximum 5x in 2030 to 2031.
   maksimum 5x pada tahun 2030 sampai dengan
   2031.

Sampai dengan Januari 2025, Perusahaan                       Until January 2025, the Company has paid HSBC
melakukan pembayaran utang HSBC sebesar                      debt payments ampunting to Rp372,155,942. Based
Rp372.155.942. Berdasarkan surat CMU/01/0046                 on letter CMU/01/0046 from HSBC on January 31,
dari HSBC pada 31 Januari 2025, Perusahaan telah             2025, the Company has paid off all Tranche A,
melunasi seluruh fasilitas Tranche A, Tranche B,             Tranche B, and Tranche C facilities of
dan Tranche C sebesar Rp1.060.840.163. Sehingga              Rp1,060,840,163. As a result, the Company recorded
Perusahaan mencatat keuntungan bersih atas                   a net profit on the payment of all HSBC debts of
                                                           118

Page 128
PT WIJAYA KARYA (PERSERO) Tbk                                               PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                         AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                      NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                  FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                      For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                               June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                             And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                            Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                          (In Thousand Rupiah, unless Otherwise Stated)
pembayaran seluruh utang HSBC sebesar                        Rp688,684,221 (Note 48). Following this repayment,
Rp688.684.221 (Catatan 48). Dengan pelunasan ini,            the Company no longer has any obligations to the
Perusahan tidak lagi memiliki kewajiban kepada               HSBC and HSBC no longer has any interest in the
HSBC dan HSBC tidak memiliki kepentingan atas                collateral documents previously provided by the
dokumen jaminan yang sebelumnya diberikan oleh               Company.
Perusahaan.

Dalam     rangka    restrukturisasi,   Perusahaan            In the context of restructuring, the Company provides
memberikan jaminan kepada Kreditur berupa:                   guarantees to Creditors in the form of:
• Jaminan fidusia atas tagihan proyek yang belum             • Fiduciary guarantee for unsecured project bills
  dijaminkan yang bersifat pari-passu bagi semua                 which is pari-passu for all creditors;
  Kreditur;
• Jaminan gadai beberapa rekening bank; dan                  •   Guarantees for several bank accounts; and
• Jaminan berupa aset tetap dan kepemilikan                  •   Collateral in the form of fixed assets and share
  saham pada entitas anak perusahaan kepada                      ownership in subsidiaries to creditors.
  Kreditur.

Pinjaman Sindikasi                                           Syndicated Loan
WIKA Serpan                                                  WIKA Serpan
Fasilitas Kredit Sindikasi 2                                 Syndicate Credit Facility 2
Berdasakan Akta No.267 tanggal 27 Juni 2024 yang             Based on the Dead No.267 dated June 27, 2024
dibuat oleh Notaris, Jimmy Tanal, S.H., M.Kn., di            made by a Notary, Jimmy Tanal S.H., M.Kn., in
Jakarta Selatan, WIKA Serpan melakukan                       Jakarta, the WIKA Serpan carried out a restructure
restrukturisasi atas Perjanjian Kredit Sindikasi dari        regarding syndicated credit facility from PT Bank
PT Bank Mandiri (Persero) Tbk, PT Bank                       Mandiri (Persero) Tbk, PT Bank Pembangunan
Pembangunan Daerah Jawa Tengah, PT Bank                      Daerah Jawa Tengah, PT Bank Pembangunan
Pembangunan        Daerah     Papua,     PT    Bank          Daerah Papua, PT Bank Pembangunan Sumatera
Pembangunan Daerah Sumatera Utara, PT Bank                   Utara, PT Bank Pembangunan Daerah Jawa Barat
Pembangunan Daerah Jawa Barat dan Banten Tbk,                dan Banten Tbk, PT Bank Pembangunan Daerah
PT Bank Pembangunan Daerah Sulawesi Selatan                  Sulawesi      Selatan  dan       Sulawesi   Barat,
dan Sulawesi Barat, PT Bank Mestika Dharma Tbk,              PT Bank Mestika Dharma Tbk, PT Bank ICBC
PT Bank ICBC Indonesia, dan PT Bank                          Indonesia and PT Bank Pembangunan Daerah
Pembangunan Daerah Sumatera Selatan dan                      Sumatera Selatan dan Bangka Belitung with the
Bangka Belitung dengan rincian fasilitas sebagai             following details:
berikut:
Jenis Fasilitas                                    Syndicate Loan                                        Facility Type
Plafon                                            Rp2,583,287,019                                                 Limit
Jangka Waktu               20 tahun dari tanggal penandatangan perjanjian pinjaman/                      Time Period
                                  20 years from the loan agreement signing date
Tujuan                      Untuk membiayai pembangunan jalan tol ruas Serang –                               Purpose
                           Panimbang dan untuk menampung bunga Kredit Investasi
                          Pokok selama masa konstruksi termasuk masa awal operasi/
                           to finance the construction of the Serang – Panimbang toll
                                road and to accommodate the interest on Principal
                         Investment Credit during the construction period, including the
                                             initial period of operation
Suku Bunga                6% dengan porsi efektif dan deferred/ 6% with effective and                          Interest
                                                   deferred portion

Perjanjian fasilitas kredit sindikasi tersebut memiliki      The syndicated credit facility agreement has an
akad persetujuan antara lain:                                affirmative covenant as follows:
• Menjaga Debt to Equity Ratio (DER) yang                    • Maintain a Debt to Equity Ratio (DER) ratio that
  mencerminkan komposisi baki debet pembiayaan                   reflects the composition of the creditor’s self-
  para kreditur dengan self-financing maksimum                   financing debit balance maximum creditor
  pembiayaan kreditur sebesar 70% dan minimum                    financing of 70% and minimum self-financing of
                                                           119

Page 129
PT WIJAYA KARYA (PERSERO) Tbk                                               PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                         AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                      NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                  FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                      For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                               June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                             And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                            Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                          (In Thousand Rupiah, unless Otherwise Stated)
  self-financing debitur sebesar 30%;                          debtors of 30%;
• Menjaga Debt-Service Coverage Ratio (DSCR)                 • Maintain Debt-Service Coverage Ratio (DSCR)
  di atas 1 yang mulai dievaluasi sejak tahun 2026,            above 1 times which will begin to be evaluated
  Apabila DSCR kurang dari 1,0 namun Debitur                   from 2026. If the DSCR is less than 1.0 but the
  tetap memenuhi kewajiban jatuh tempo dianggap                Debtor continues to fulfill its maturing obligations it
  tidak melanggar covenant;                                    is considered not to have violated the covenant;
• PT Wijaya Karya (Persero) Tbk tetap menjadi                • PT Wijaya Karya (Persero) Tbk remains a major
  pemegang saham mayoritas dengan minimal                      shareholder with minimum portion of 51%; and
  porsi 51%; dan
• Menjaga ekuitas selalu positif.                            • Maintain equity always positive.

Hal-hal yang tidak boleh dilakukan WIKA Serpan               Items that are prohibited for WIKA Serpan, as stated
yang diatur dalam perjanjian fasilitas kredit sindikasi      in the syndicated credit facility agreement are as
adalah sebagai berikut:                                      follows:
• Memperoleh kredit atau pinjaman lain dari                  • Obtain credit or other loans from financial
  lembaga keuangan atau pihak ketiga kecuali                     institutions or third parties except for existing
  pinjaman yang telah berjalan, pinjaman dari                    loans, loans from shareholders and cash fulfillment
  pemegang saham dan pinjaman pemenuhan                          loans; and
  dana tunai; dan
• Mengubah nama perusahaan dan komposisi                     • Change the company name and shareholder
  pemegang saham.                                              composition.

Rincian saldo pinjaman fasilitas kredit sindikasi 2          The details of the syndicated credit facility 2 loan
per 30 Juni 2026 dan 31 Desember 2025 adalah                 balance as of June 30, 2026 and December 31, 2025
sebagai berikut:                                             are as follows:

                                                                                  2026                   2025
                                                                                   Rp                     Rp

Pihak Berelasi (Catatan 52)/ Related Parties (Note 52)
  PT Bank Mandiri (Persero) Tbk                                                    926.565.975            927.963.510

Pihak Ketiga/ Third Parties
  PT Bank Pembangunan Daerah Jawa Tengah                                           463.339.881            464.038.734
  PT Bank Pembangunan Daerah Papua                                                 354.002.779            354.536.720
  PT Bank Pembangunan Daerah Sumatera Utara                                        292.779.395            293.220.993
  PT Bank Pembangunan Daerah Jawa Barat dan Banten Tbk                             277.958.414            278.377.657
  PT Bank Pembangunan Daerah Sulawesi Selatan dan Sulawesi Barat                   185.267.680            185.547.119
  PT Bank Pembangunan Daerah Sumatera Selatan
    dan Bangka Belitung                                                             29.642.105              29.686.814
  PT Bank Mestika Dharma Tbk                                                        19.761.356              19.791.162
  PT Bank ICBC Indonesia                                                            19.761.356              19.791.162
  Subtotal                                                                       1.642.512.965           1.644.990.360
Total                                                                            2.569.078.940           2.572.953.870


Fasilitas Kredit Sindikasi 3                                 Syndicate Credit Facility 3
Berdasarkan Akta No.268 tanggal 27 Juni 2024                 Based on the Deed No.268 dated June 27, 2024
yang dibuat oleh Notaris, Jimmy Tanal, S.H., M.Kn.,          made by a Notary, Jimmy Tanal, S.H., M.Kn., in
di Jakarta Selatan, WIKA Serpan melakukan                    Jakarta, WIKA Serpan submitted a restrusture of
restrukturisasi atas Perjanjian Kredit Sindikasi             syndicated credit facility based on the Musyarakah
Berdasarkan Prinsip Musyarakah Mutanaqishah                  Mutanaqishah (MMQ) Principle from PT Bank Syariah
(MMQ) dari PT Bank Syariah Indonesia Tbk,                    Indonesia Tbk, PT Sarana Multi Infrastruktur
PT Sarana Multi Infrastruktur (Persero), PT Bank             (Persero), PT Bank Pembanguan Daerah Aceh
Pembangunan Daerah Aceh Syariah, PT Bank                     Syariah, PT Bank Panin Dubai Syariah Tbk, PT Bank
Panin Dubai Syariah Tbk, PT Bank Pembangunan                 Pembangunan Daerah Sumatera Utara Unit Usaha
Daerah Sumatera Utara Unit Usaha Syariah dan                 Syariah and PT Bank Pembangunan Daerah
                                                           120

Page 130
PT WIJAYA KARYA (PERSERO) Tbk                                               PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                         AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                      NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                  FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                      For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                               June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                             And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                            Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                          (In Thousand Rupiah, unless Otherwise Stated)
PT Bank Pembanguan Daerah Sumatera Selatan                   Sumatera Selatan and Bangka Belitung Business Unit
dan Bangka Belitung Unit Usaha Syariah dengan                Syariah are follows:
rincian fasilitas sebagai berikut:
Jenis Fasilitas            Syndicate Credit Based on the Musyarakah Mutanaqishah                        Facility Type
                                                 (MMQ) Principle
Plafon                                          Rp1,575,035,392                                               Limit
Jangka Waktu               20 tahun dari tanggal penandatangan perjanjian pinjaman/                     Time Period
                                  20 years from the loan agreement signing date
Tujuan                       untuk membiayai pembangunan jalan tol ruas Serang –                            Purpose
                           Panimbang dan untuk menampung bunga Kredit Investasi
                          Pokok selama masa konstruksi termasuk masa awal operasi/
                           to finance the construction of the Serang – Panimbang toll
                         road and to accommodate the interest on Principal Investment
                            Credit during the construction period, including the initial
                                               period of operation
Suku Bunga                6% dengan porsi efektif dan deferred/ 6% with effective and                        Interest
                                                 deferred portion

Perjanjian fasilitas kredit sindikasi tersebut memiliki      The syndicated credit facility agreement has an
akad persetujuan antara lain:                                affirmative covenant as follows:
• Menjaga rasio DER yang mencerminkan                        • Maintain a DER ratio that reflects the composition
  komposisi baki debet pembiayaan para kreditur                  of the creditor's self-financing debit balance;
  dengan self financing;
• Maksimum pembiayaan kreditur sebesar 70%                   • Maximum creditor financing of 70% and minimum
  dan minimum self financing debitur sebesar 30%;              self-financing of debtors of 30%;
• Menjaga Debt-Service Coverage Ratio (DSCR) di              • Maintain Debt-Service Coverage Ratio (DSCR)
  atas 1 yang mulai dievaluasi sejak tahun 2026,               above 1 times which will begin to be evaluated
  Apabila DSCR kurang dari 1,0 namun Debitur                   from 2026. If the DSCR is less than 1.0 but the
  tetap memenuhi kewajiban jatuh tempo dianggap                Debtor continues to fulfill its maturing obligations it
  tidak melanggar covenant;                                    is considered not to have violated the covenant;;
• Perusahaan tetap menjadi pemegang saham                    • The Company remains a major shareholder with
  mayoritas dengan minimal porsi 51%;                          minimum portion of 51%;
• Menjaga ekuitas selalu positif.                            • Keeping equity always positive.

Hal-hal yang tidak boleh dilakukan WIKA Serpan               Items that are prohibited for WIKA Serpan, as stated
yang diatur dalam perjanjian fasilitas kredit sindikasi      in the syndicated credit facility agreement are as
adalah sebagai berikut:                                      follows:
• Memperoleh kredit atau pinjaman lain dari                  • Obtain credit or other loans from financial
  lembaga keuangan atau pihak ketiga kecuali                     institutions or third parties except for existing
  pinjaman yang telah berjalan, pinjaman dari                    loans, loans from shareholders and cash fulfillment
  pemegang saham dan pinjaman pemenuhan                          loans; and
  dana tunai; dan
• Mengubah nama WIKA Serpan dan komposisi                    • Change WIKA Serpan name and shareholder
  pemegang saham.                                              composition.

Rincian saldo pinjaman fasilitas kredit sindikasi 3          The details of the syndicated credit facility 3 loan
per 30 Juni 2026 dan 31 Desember 2025 adalah                 balance as of June 30, 2026 and December 31, 2025
sebagai berikut:                                             are as follows:




                                                           121

Page 131
PT WIJAYA KARYA (PERSERO) Tbk                                               PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                         AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                      NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                  FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                      For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                               June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                             And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                            Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                          (In Thousand Rupiah, unless Otherwise Stated)
                                                                                   2026                    2025
                                                                                    Rp                      Rp

Pihak Berelasi (Catatan 52)/ Related Parties (Note 52)
  PT Bank Syariah Indonesia Tbk                                                     608.773.162              609.691.372
  PT Sarana Multi Infrastruktur (Persero)                                           406.871.210              407.484.892
  Subtotal                                                                        1.015.644.372            1.017.176.264
Pihak Ketiga/ Third Parties
  PT Bank Pembangunan Daerah Aceh Syariah                                           260.886.528              261.280.022
  PT Bank Panin Dubai Syariah Tbk                                                   173.886.423              174.148.696
  PT Bank Pembangunan Daerah Sumatera Utara Unit Usaha Syariah                      101.477.739              101.630.798
  PT Bank Pembangunan Daerah Sumatera Selatan
    dan Bangka Belitung Unit Usaha Syariah                                           14.477.634               14.499.471
  Subtotal                                                                          550.728.325              551.558.986
Total                                                                             1.566.372.697            1.568.735.251

 WTJJ                                                        WTJJ
PT Bank Mandiri (Persero) Tbk                                PT Bank Mandiri (Persero) Tbk
Berdasarkan Akta No. 29 tanggal 29 September                 Based on Deed No. 29 dated September 29, 2025
2025 dari Notaris, Lia Amalia, S.H., M.Kn. WTJJ              from Notary, Lia Amalia, S.H., M.Kn. WTJJ obtained a
memperoleh fasilitas kredit dari PT Bank Mandiri             credit facility from PT Bank Mandiri (Persero) Tbk.
(Persero) Tbk.

Fasilitas pinjaman PT Bank Mandiri (Persero) Tbk             This loan facility from PT Bank Mandiri (Persero) Tbk
ini merupakan refinancing dari fasilitas sindikasi.          is a refinancing of a syndicated facility.


Fasilitas kredit dengan rincian sebagai berikut:             Loan facility with details as follows:

Jenis fasilitas                   :          Kredit Investasi/ Investment Loan        :                 Type of facility
Jangka waktu                      :     Maksimal 168 bulan dari tanggal Perjanjian    :                 Time of period
                                        Kredit (termasuk periode ketersediaan dana
                                       dan Masa Tenggang)/ Maximum 168 months
                                      from date of the loan agreement(including the
                                          period of availability of funds and Grace
                                                           Period)
Tujuan Fasilitas Kredit Investasi: Membiayai total investasi atas Proyek Perjanjian :                        Purpose of
(KI Pokok)                               Kerja Sama dengan Perusahaan – Sistem                      Investment Credit
                                     Penyediaan Air Minum Regional Jatiluhur I (PKS               Facility (KI Principal)
                                        KPBU)/Financing the total investment of the
                                   Cooperation Agreement Project with the Company –
                                    Jatiluhur I Regional Drinking Water Supply System
                                                         (PKS PPP)
Total Plafon                     :                    Rp1,290,600,000                 :                      Total Limit
Suku Bunga                       :                        6,5% p.a                    :                   Interest Rate

Fasilitas ini dijamin dengan beberapa ketentuan              The facilitiy is guaranteed by certain clauses as
sebagai berikut:                                             follows:
i. Dokumen Proyek: (i) Pekerjaan Kerja Sama                  i. Project Documents: (i) Government Cooperation
   Pemerintah dengan Badan Usaha - Sistem                         with Business Entities - Regional Drinking Water
   Penyediaan Air Minum Regional I Jatiluhur serta                Supply System I Jatiluhur and addendum made
   addendum yang dibuat oleh Perusahaan sebagai                   by Company as implementing business entity
   Badan Usaha Pelaksana (Catatan 23.a); (ii)                     (Note 23.a); (ii) Ministry of Public Works and
   Kementerian Pekerjaan Umum dan Perumahaan                      People's Housing, BAST I provided by PJPK,
   Rakyat, BAST I yang disediakan oleh PJPK,                      Agreement Jatiluhur I Regional SPAM Design
   Perjanjian Paket Rancang Bangun SPAM                           Package and addendum, Bulk Drinking Water

                                                           122

Page 132
PT WIJAYA KARYA (PERSERO) Tbk                                                  PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                            AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                         NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                     FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                         For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                  June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                                And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                               Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                             (In Thousand Rupiah, unless Otherwise Stated)
     Regional Jatiluhur I serta addendum, Perjanjian                 Supply Agreement (Note 23.b);
     Penyediaan Air Minum Curah (Catatan 23.b);
ii. Seluruh rekening penampung;                              ii. All holding accounts;
iii. Seluruh bangunan, barang bergerak dan                   iii. All buildings, movable goods and supplies related
     persediaan      sehubungan      dengan    proyek             to the project (including raw water units,
     (termasuk unit air baku, unit produksi, jaringan             production units, transmission pipelines, and
     pipa transmisi, dan jaringan distribusi);                    distribution networks);
 iv. Seluruh tagihan dan pendapatan;                          iv. All invoices and income;

Perjanjian fasilitas kredit tersebut memiliki akad           The credit facility agreement has an affirmative
persetujuan antara lain:                                     covenant as follows:
• Adjusted Debt Service Coverage Ratio (DCSR)                • Debt Service Coverage Ratio (DCSR) namely
   yaitu EBITDA + Kas Awal dibagi dengan (Biaya                 EBITDA + Cash by (Interest Cost + Principal
   bunga + Angsuran Utang Pokok) minimal 1x;                    Installment) at least 1x;
• Laba bersih bernilai positif sejak tahun 2028;             • Net income is positive since 2028;
• Menjaga posisi modal (equity) Perusahaan                   • Maintaining the Company's capital position
    selalu positif; dan                                         (equity) always positive; and
• Memenuhi           kewajiban   dana      cadangan          • Meet debt payment reserve fund obligations in
    pembayaran utang pada rekening cadangan                     the debt payment reserve account of at least 1x
    pembayaran utang minimal sebesar 1x bunga                   interest and principal repayments.
    dan angsuran baki debet.

Hal-hal yang tidak boleh dilakukan WTJJ yang                 Items that are prohibited for WTJJ, as stated in the
diatur dalam perjanjian fasilitas kredit sindikasi           syndicated credit facility agreement are as follows:
adalah sebagai berikut:
• Mengadakan atau memperoleh pinjaman atau                   •       Obtaining loans or credit facilities from banking,
    fasilitas kredit dari lembaga perbankan,                         financial institutions or third parties;
    keuangan atau pihak ketiga;
• Melakukan perubahaan komposisi saham yang                  •       Changing the composition of shares owned by
    dimiliki oleh pemegang saham debitur,                            debtor shareholders, transfer or sell the WTJJ's
    mengalihkan atau menjual kepemilikan saham                       share ownership;
    WTJJ;
• Melakukan perubahan modal dasar dan/atau                   •       Changing the authorized capital and/or paid-in
    modal disetor dilakukan dengan tetap menjaga                     capital while maintaining the composition of the
    komposisi saham Perusahaan pada WTJJ                             Company's shares in WTJJ at least 51%;
    minimal 51%;
• Melakukan divestasi, pengabungan, konsolidasi              •       Divesting, merging, consolidate and/or take over
    dan/atau pengambilalihan atas sebagian atau                      part or all of the shares owned by other
    seluruh saham milik perusahaan lain;                             companies;
• Menjual dan/atau memindahkan aset pada                         •   Selling and/or transfer assets in the project to
    proyek kepada pihak lain; dan                                     other parties; and
• Menjual, melepaskan atau mengalihkan atas                      •   Selling, release or transfer all or part of the
    seluruh atau sebagian dari harta kekayaan atau                   assets or assets of WTJJ as collateral for the
    aset WTJJ menjadi jaminan perjanjian kredit.                     credit agreement.

WIKA Realty                                                  WIKA Realty
PT Bank Tabungan Negara (Persero) Tbk                        PT Bank Tabungan Negara (Persero) Tbk (“BTN”)
(“BTN”)
Pada tanggal 14 April 2023, WIKA Realty                      On April 14, 2023, WIKA Realty entered into an
melakukan perjanjian dengan BTN dengan                       agreement with BTN by signing a Corporate Loan –
menandatangani fasilitas Pinjaman Perusahaan –               Term Loan facility amounting to Rp159,230,000, with
Pinjaman Berjangka (Corporate Loan – Term Loan)              a term up to April 14, 2027 and an interest rate of
sebesar Rp159.230.000 dengan jangka waktu                    9.25% per annum.
sampai dengan 14 April 2027 dan suku bunga
9,25% per tahun.

                                                           123

Page 133
PT WIJAYA KARYA (PERSERO) Tbk                                               PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                         AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                      NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                  FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                      For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                               June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                             And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                            Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                          (In Thousand Rupiah, unless Otherwise Stated)
Fasilitas ini dijamin dengan piutang usaha dan               This facility is secured by trade receivables and
persediaan serta digunakan untuk modal kerja                 inventories and is used for working capital for the
konstruksi proyek-proyek landed house (Tamansari             construction of landed house projects (Tamansari
Cyber Bogor, Tamansari Puri Bali 2 Depok,                    Cyber Bogor, Tamansari Puri Bali 2 Depok,
Tamansari Granda Samarinda, dan Tamansari                    Tamansari Granda Samarinda, and Tamansari
Swarna Palembang).                                           Swarna Palembang).

Berikut adalah pembatasan rasio BTN:                         The following are the restrictions ratio of BTN:
• Debt Equity Ratio (DER) maksimal sampai                    • Debt Equity Ratio (DER) maximum up to 500%;
    dengan 500%;
• Rasio modal disetor terhadap total utang WIKA              •   The ratio of paid-up capital to the WIKA Realty
    Realty (utang yang ada dan yang akan ada) di                 total debt (existing and future indebtedness) to
    Bank BTN minimal sebesar 10%;                                Bank BTN shall be at a minimum of 10%;
• Ekuitas harus positif;                                     •   Positive equity;
• Rasio agunan minimal sebesar 125%;                         •   Minimum collateral ratio of 125%;
• Debt Service Coverage minimal 100%.                        •   Minimum Debt Service Coverage of 100%.

WIKA IKON                                                    WIKA IKON
PT Bank Tabungan Negara (Persero) Tbk                        PT Bank Tabungan Negara (Persero) Tbk
Pada tanggal 25 April 2025, WIKA IKON melakukan              On April 25, 2025 WIKA IKON entered into an
perjanjian dengan BTN dengan menandatangani                  agreement with BTN by signing a banking facility with
fasilitas perbankan dengan No. 124/S/CBD/IV/ 2025            No. 124/S/CBD/IV/2025 for Working Capital, SKBDN
untuk fasilitas Kredit Modal Kerja, SKBDN dan                and Stand by Load Credit facilities amounting to
Stand by Load sebesar Rp165.000.000. Jangka                  Rp165,000,000. The period is until January 30, 2026.
waktu sampai dengan 30 Januari 2026.

WIKA IKON menjaminkan tagihan termin atau                    WIKA IKON guarantees the installment bill or
pembayaran yang akan diterima dari PT Adhi Karya             payment to be received from PT Adhi Karya
(Persero) Tbk berdasarkan surat perjanjian                   (Persero) Tbk based on the contract agreement letter
pemborongan       Nomor      001/SCM/KSDI/INF/               Number 001/SCM/KSDI/INF/Op1/VIII/2022 dated
Op1/VIII/2022 tanggal 1 Agustus 2022, tagihan                August 1, 2022, the installment bill or payment to be
termin atau pembayaran yang akan diterima WIKA               received by WIKA IKON and PT PP (Persero) Tbk
IKON dan PT PP (Persero) Tbk berdasarkan Surat               based on the Subcontractor Agreement Letter
Perjanjian   Subkontraktor   No.1413/SPS/SCM/                No.1413/SPS/SCM/PP/EPC/719002/V/2023           dated
PP/EPC/719002/V/2023 tanggal 1 Mei 2023,                     May 1, 2023, the installment bill or payment to be
tagihan termin atau pembayaran yang akan                     received by WIKON and KSO PP-WASKITA-WIKA
diterima WIKON dan KSO PP-WASKITA-WIKA                       based on the Procurement of Services Agreement
berdasarkan Surat Perjanjian Pengadaan jasa                  Letter Number Tp.01.03/PP-WASKITA-WIKA.KSO/
Nomor          Tp.01.03/PP-WASKITA-WIKA.KSO                  PROBOWANGI.3/PPJ/006/VII/2023 dated July 6,
/PROBOWANGI.3/PPJ/006/VII/2023 tanggal 6 Juli                2023.
2023.

WIKA IKON wajib memenuhi persyaratan menjaga                 WIKA IKON is required to fulfill certain financial ratios
rasio keuangan sebagai berikut:                              requirements as follows:
• Current Ratio minimal 100%;                                • Current Ratio is no less than 100%;
• ISCR minimal 100%; dan                                     • ISCR at minium of 100%; and
• Debt Equity Ratio maksimal 300%.                           • Debt Equity Ratio at maksimum of 300%.

PT Bank DKI                                                  PT Bank DKI
Pada tanggal 26 Juni 2025, WIKA IKON melakukan               On June 26, 2025, WIKA IKON entered into an
perjanjian dengan Surat Persetujuan Restrukturisasi          agreement through the Credit Restructuring Approval
Kredit No.983/SPPK/925/VI/2025 atas fasilitas                Letter No. 983/SPPK/925/VI/2025 for a Working
Kredit     Modal    Kerja    Aflopend     sebesar            Capital Credit facility (Aflopend) amounting to
Rp165.000.000 (Catatan 26) dengan jangka waktu               Rp165,000,000 (Note 26), with a term up to June 26,
sampai dengan 26 Juni 2027 dan suku bunga 8%                 2027 and an interest rate of 8% per annum.
per tahun.
                                                           124

Page 134
PT WIJAYA KARYA (PERSERO) Tbk                                                 PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                           AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                    FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                        For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                 June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                               And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                              Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                            (In Thousand Rupiah, unless Otherwise Stated)

WIKA IKON menjaminkan piutang usaha dan                      WIKA IKON pledged trade receivables                    and
persediaan (Catatan 6 dan 11).                               inventories as collateral (Notes 6 and 11).

WIKA Gedung                                                  WIKA Gedung
PT Bank Mandiri (Persero) Tbk                                PT Bank Mandiri (Persero) Tbk
Berdasarkan Surat Penawaran Pemberian Kredit                 Based on Letter of Credit Offering for working capital
untuk modal kerja Nomor: CBG.CB2/SCD.                        Number:     CBG.CB2/SCD.SPPK.074/2020           dated
SPPK.074/2020 tanggal 16 September 2020 dan                  September 16, 2020 and Deed No. 28 dated
Akta No. 28 tanggal 25 September 2020 dibuat di              September 25, 2020 made before Fathiah Helmi,
hadapan Fathiah Helmi, S.H., Notaris di Jakarta              S.H., Notary in Jakarta terms and conditions:
dengan persyaratan sebagai berikut:
Limit Kredit   Rp116.000.000                                 Credit Limit         Rp116,000,000
Jangka Waktu Sampai 24 September 2030                        Time Period          Until September 24, 2030,
               termasuk masa penarikan dan                                        including the principal drawdown
               grace period pokok selama 6 bulan                                  period and grace period of 6
               setelah           penandatanganan                                  months after signing the credit
               perjanjian kredit                                                  agreement
Tingkat Bunga 9.5 % per tahun                                Interest Rate        9,5% per annum
Provisi        1% per tahun dari limit kredit                Provision            1% per annum of credit limit
Annual         1% per tahun dari limit kredit                Annual               1% per annum of credit limit
Servicing Fee                                                Servicing Fee
Biaya          Rp50.000 dibayarkan sebelum                   Administration       Rp50,000 paid before signing of
Administrasi   penandatanganan perjanjian                    Fee                  agreement
Commitment     2% dari jumlah porsi yang belum               Commitment           2% of the undisbursed portion of
Fee            ditarik sampai dengan masa                    Fee                  the portion until the withdrawal
               penarikan                                                          period
Agunan         Sebesar Rp145.000.000 dengan                  Collateral           Amounted to Rp145,000,000 with
               rincian sebagai berikut:                                           the details are as follows:
                - Gadai Rekening Penampung                                        - Revenue Accounts and Debt
                  Pendapatan dan Debt Service                                       Service Accounts (Escrow
                  Account (Rekening Escrow);                                        Account);
                - Fidusia Piutang Sewa dan                                        - Rent and Receivables for the
                  Piutang Proyek Graha Mantap;                                      Graha Mantap Project;
                - Fidusia Hasil Klaim Asuransi                                    - Rent and Receivables for the
                  atas Bangunan Proyek Graha                                        Graha Mantap Project; and
                  Mantap; dan
                - Fidusia   Hasil   Klaim     Bank                                - Bank Guarantee Claims on
                  Garansi atas Bangunan Proyek                                      Graha     Mantap  Building
                  Graha Mantap.                                                     Projects.

Pelunasan fasilitas kredit dilakukan dengan cara             Repayment of credit facilities is made in installments
mengangsur pada setiap tanggal 23 untuk setiap               on the 23rd for each of the quarterly.
triwulan.

Debitur wajib menjaga rasio keuangan yaitu current           Debtors are required to maintain financial ratios,
ratio minimal 100%, leverage maksimal 500%, dan              namely a minimum current ratio of 100%, a maximum
EBITDA minimal sebesar 200%.                                 leverage of 500%, and a minimum EBITDA of 200%.




                                                           125

Page 135
PT WIJAYA KARYA (PERSERO) Tbk                                               PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                         AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                      NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                  FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                      For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                               June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                             And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                            Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                          (In Thousand Rupiah, unless Otherwise Stated)
WIKA Beton                                                   WIKA Beton
PT Bank Mandiri (Persero) Tbk                                PT Bank Mandiri (Persero) Tbk
Pada tanggal 28 Mei 2025, WIKA Beton telah                   On May 28, 2025, WIKA Beton has approved the
melakukan      persetujuan      perpanjangan     dan         extension and increase of the credit facility limit with
tambahan limit fasilitas kredit kepada PT Bank               PT Bank Mandiri (Persero) Tbk with the offer credit
Mandiri (Persero) Tbk dengan surat penawaran                 letter No. CBG.CB5/SIC2.SPPK.231/2025 for the
pemberian                   kredit               No.         provision of credit facilities consisting of Transactional
CBG.CB5/SIC2.SPPK.231/2025 atas pemberian                    Working Capital Facility amounting to Rp700,000,000,
fasilitas  kredit   terdiri   dari Fasilitas    KMK          a Non Cash Loan Facility amounted to
Transaksional sebesar Rp700.000.000, Fasilitas               Rp1,400,000,000, Global Line (LC/SKBN) Facility
Non-Cash Loan sebesar Rp1.400.000.000, Global                amounted to Rp500,000,000, Investment Credit
Line (LC/SKBN) sebesar Rp500.000.000, Fasilitas              Facility (Refinancing) I amounted to Rp500,000,000,
Kredit    Investasi    (Refinancing)    I    sebesar         and Investment Credit Facility (Refinancing) II
Rp500.000.000, dan Fasilitas Kredit Investasi                amounted to Rp800,000,000, with an interest rate
(Refinancing) II sebesar Rp800.000.000 dengan                ranging from 8.00% - 8.65% per annum.
tingkat bunga sebesar 8,00% - 8,65% per tahun.

Masa berlaku perjanjian sesuai perpanjangan                  The validity of the agreement according to the
fasilitas sejak 11 Juni 2025 sampai dengan 10 Juni           extension of facilities is from June 11, 2025 until June
2026.                                                        10, 2026.

Pinjaman tersebut dijamin dengan piutang,                    The loan is pledged by receivebles, inventories, land
persediaan, tanah dan bangunan (Catatan 5, 9, dan            and building (Notes 5, 9 and 16).
16).

WIKA Beton diharuskan untuk mematuhi beberapa                WIKA Beton is required to comply with several
batasan untuk mempertahankan rasio keuangan                  restrictions to maintain financial ratios as follows:
sebagai berikut:
a. Current Ratio minimal sebesar 100%;                       a. Current Ratio minimum of 100%;
b. Debt to Equity Ratio maksimal 300%; dan                   b. Debt to Equity Ratio maximum of 300%; and
c. Debt Service Coverage Ratio minimal 110%.                 c. Debt Service Coverage Ratio minimum of 110%.

WIKA Beton                                                   WIKA Beton
PT Bank CIMB Niaga Tbk                                       PT Bank CIMB Niaga Tbk
Pada tanggal 20 Maret 2024, WIKA Beton telah                 On March 20, 2024, WIKA Beton has obtain
menerima persetujuan perjanjian pembiayaan                   approval of a financing agreement with PT Bank
kepada PT Bank CIMB Niaga Tbk dengan perjanjian              CIMB Niaga Tbk with agreement No. 042/BN/CBT-
No. 042/BN/CBT-VII/III/2024.                                 VII/III/2024.

Fasilitas jangka panjang yang diberikan merupakan            Long-term facilities provided are in the form of iB
berupa      Fasilitas  Pembiayaan    Investasi iB,           Investment     Financing     Facility,  Musyarakah
Musyarakah Mutanaqisah, Fasilitas Pembiayaan                 Mutanaqisah, Direct Financing Facility, On
Langsung, On Liquidation Basis, dan Committed                Liquidation Basis, and Committed (PI MMQ Facility)
(Fasilitas PI MMQ) sebesar Rp400.000.000. Jangka             amounted to Rp400,000,000. The term of the
waktu perjanjian selama 5 tahun sejak 30 Oktober             agreement is 5 years from October 30, 2021 until
2021 sampai dengan 30 Juli 2026. Skema ujrah bagi            July 30, 2026. The profit sharing ujrah scheme is
hasil bersifat floating setiap bulan, sesuai Nota            floating every month, according to the Income/Profit
Komitmen Proyeksi Pendapatan/Laba yang dibuat                Projection Commitment Note made by Bank CIMB
oleh Bank CIMB Niaga dan disetujui oleh WIKA                 Niaga and approved by WIKA Beton. The ujrah profit
Beton. Tingkat ujrah bagi hasil pada tahun 2022              sharing rate in 2022 starts from 53.15% for
dimulai dari 53,15% untuk Perusahaan dan 46,85%              Companies and 46.85% for Banks up to 66.53% for
untuk Bank hingga 66,53% untuk Perusahaan dan                Companies and 33.47% for Bank.
33,47% untuk Bank.

Agunan atas perjanjian tersebut berupa piutang, aset         Collaterals for the agreement are in the form of
tetap (tanah, bangunan, dan mesin), dan rekening             receivables, property, plant and equipment (land,
                                                           126

Page 136
PT WIJAYA KARYA (PERSERO) Tbk                                                 PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                           AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                    FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                         For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                  June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                                And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                               Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                             (In Thousand Rupiah, unless Otherwise Stated)
pembayaran utang (Catatan 5, 16, dan 18).                    buildings, and machinery), dan Debt                 Service
                                                             Reserve Account (Notes 5, 16, and 18).

Rasio keuangan yang harus diperhatikan adalah:               Financisal ratios that must be considered are:
a. Current Ratio minimal 100%;                               a. Current Ratio minimum of 100%;
b. Debt to Equity Ratio maksimal 400%; dan                   b. Debt to Equity Ratio at maximum 300%; and
c. Debt Security Cover Ratio minimal 100%.                   c. Debt Security Cover Ratio minimum of 100%.

Pada tanggal 31 Desember 2025, WIKA Beton telah              As of December 31, 2025, WIKA Beton has complied
memenuhi syarat dan kondisi pinjaman yang                    all the terms and conditions required by the PT Bank
ditetapkan PT Bank CIMB Niaga Tbk.                           CIMB Niaga.

Pada Maret 2025, WIKA Beton mengambil dan                    On March 2025, WIKA Beton took and received all
menerima seluruh dokumen agunan di PT Bank                   collateral documents from PT Bank CIMB Niaga Tbk
CIMB Niaga Tbk dengan fasilitas Kredit/Pembiayaan            for the Mortgage/Financing Facility for Home
Kepemilikan Rumah/Kredit/Pembiayaan Kepemilikan              Ownership/Car Ownership Loan/Financing and
Mobil/dan lain-lain yang telah lunas.                        others that have been fully settled.

WIKA IKON                                                    WIKA IKON
PT Bank CIMB Niaga Tbk                                       PT Bank CIMB Niaga
Berdasarkan Surat Perubahan Ke-24 Nomor                      Based on Amendment Letter No. 24 No.
002/AMD/CB/JKT/2025 Tanggal 3 Januari 2025                   002/AMD/CB/JKT/2025 dated January 3, 2025,
Atas Perubahan Pernyataan Kembali Fasilitas Kredit           regarding the Amendment to the Restatement of
No: 246/AMD/CB/JKT/2011 tanggal 6 Juni 2011,                 Credit       Facility        Agreement         No.
yang mengubah tanggal jatuh tempo fasilitas menjadi          246/AMD/CB/JKT/2011 dated June 6, 2011, which
jangka pendek (Catatan 26).                                  changes the facility’s maturity date to short-term
                                                             (Note 26).

Masa berlaku kredit sampai dengan 1 September                The credit validity period until September 1, 2025.
2025.

Fasilitas ini WIKA IKON wajib menyerahkan piutang            Under this facility, WIKA IKON is required to pledge
usaha dan persediaan, serta wajib memenuhi                   its trade receivables and inventory, as well as comply
persyaratan menjaga rasio keuangan sebagai                   with the following financial ratio requirements:
berikut:
• Current Ratio minimal 1 kali;                              •     Current Ratio minimum of 1 times;
• DSCR minimal 100%; dan                                     •     DSCR minimum 100%; and
• Debt to Equity Ratio maksimal 2,5 kali.                    •     Debt to Equity Ratio maximum 2.5 times.

WIKA Realty                                                  WIKA Realty
PT Bank Victoria International Tbk                           PT Bank Victoria International Tbk
Berdasarkan Surat Persetujuan Pemberian Fasilitas            Based on the Credit Facility Approval Letter dated
Kredit pada tanggal 31 Maret 2021, WIKA Realty               March 31, 2021, WIKA Realty obtained a credit
memperoleh fasilitas kredit dari PT Bank Victoria            facility from PT Bank Victoria International Tbk, with
International Tbk, dengan rincian fasilitas sebagai          the following facility details:
berikut:
•     Fasilitas kredit FLKM      dengan      plafond             • FLKM credit facility with a plafond of
      Rp32.000.000;                                                Rp32,000,000;
•     Tingkat suku bunga 12,75% p.a;                             • Interest rate of 12.75% per annum;
•     Sampai dengan 31 Maret 2026; dan                           • Maturity up to March 31, 2026; and
•     Pinjaman bertujuan untuk tambahan modal                    • The loan is intended for additional working
      kerja untuk mengakomodasi pengembangan                       capital to support business development
      usaha yang dikelola WIKA Realty di bidang                    managed by WIKA Realty in the property sector.
      properti.

Pinjaman ini dijamin dengan persediaan.                          This loan is secured by inventories.
                                                           127

Page 137
PT WIJAYA KARYA (PERSERO) Tbk                                                 PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                           AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                    FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                     For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                              June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                            And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                           Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                         (In Thousand Rupiah, unless Otherwise Stated)
WIKA Industri Energi                                         WIKA Industri Energi
PT Bank Rakyat Indonesia (Persero) Tbk                       PT Bank Rakyat Indonesia (Persero) Tbk
Pinjaman jangka panjang WIKA Rekon merupakan                 WIKA Rekon's long-term loans are the result of the
hasil restrukturisasi pinjaman bank jangka pendek            restructuring of short-term bank loans (Note 17),
(Catatan 17), berdasarkan Akta Addendum                      based on the Deed Addendum to the Agreement on
Perjanjian Pemberian Faslitas Kredit Modal Kerja             the Provision of Working Capital Credit Facilities for
untuk Tujuan Restrukturisasi No.21 tanggal 10                the Purpose of Restructuring No.21 dated December
Desember 2024 yang dibuat di hadapan Notaris Sri             10, 2024 made before Notary Sri Ismiyati, S.H., in
Ismiyati, S.H., di Jakarta, Winner dan bank                  Jakarta, Winner and the bank signed an addendum
menandatangani perjanjian addendum perjanjian                agreement to the agreement on the provision of
pemberian fasilitas Kredit Modal Kerja untuk tujuan          Working Capital Credit facilities for the purpose of
restrukturisasi.                                             restructuring.

Berikut rincian fasilitas kredit yang diterima Winner        The following are the details of the credit facilities
setelah restrukturisasi.                                     received by Winner after the restructuring.
a. Fasilitas KMK Co. Menurun                                 a. KMK Co. Decline Facility
   Plafon           : Rp46.223.000                               Ceiling        : Rp46,223,000
   Keperluan        : Untuk menampung outstanding                Purpose        : To accommodate outstanding
                       KMK Buyer, LC/SKBDN dan                                    KMK Buyer, LC/SKBDN and
                       SCF A/P                                                    SCF A/P

   Jangka Waktu : 20 November 2024 – 28                          Time Period      : November       20,  2024   –
                    Februari 2034                                                    February 28, 2034
   Tingkat Bunga : 7%                                            Interest         : 7%
   Bentuk/Sifat  : Pseudo R/K dengan maksimum                    Nature           : Pseudo R/K with maximum
                    CO                                                               CO decline
   Jaminan       : - Piutang      usaha,     nomor               Collateral       : - Receivables, binding number
                      pengikatan               PJF                                     PJF      W10.00033815.AH.
                      W10.00033815.AH.05.02 17                                         05.02 January 17, 2024
                      Januari      2024      senilai                                   worth Rp12,535,000;
                      Rp12.535.000;
                   - Piutang usaha dan tagihan                                     - Business receivables and
                      kepada      pemberi     kerja                                  bills to employers and
                      maupun distributor yang telah                                  distributors that have been
                      dan/atau akan dibiayai oleh                                    and/or will be financed by
                      BRI, nomor pengikatan PJF                                      BRI,      binding    number
                      W10.00637599.AH.05.01 19                                       PJF W10.00637599.AH.05.
                      Desember      2023     senilai                                 01 December 19, 2023 worth
                      Rp50.655.000;                                                  Rp50,655,000;
                   - Persediaan,             nomor                                 - Inventory, binding number
                      pengikatan               PJF                                   PJF W10.00033816.AH.05.
                      W10.00033816.AH.05.02 17                                       02 January 17, 2024 worth
                      Januari      2024      senilai                                 Rp23,731,000;
                      Rp23.731.000; dan
                   - Bangunan       dan     Sarana                                 - Building and Faclities located
                      Pelengkap yang berdiri di                                      at SHGB 4, binding number
                      SHGB 4, nomor pengikatan                                       PJF W10.00033817.AH.05.0
                      PJF W10.00033817.AH.05.                                        2.05.02 January 17, 2024
                      02 17 Januari 2024 senilai                                     worth Rp4,008,000.
                      Rp4.008.000.

b. Fasilitas Bank Garansi                                    b. Bank Guarantee Facility
   Plafon KMKI     : Rp4.432.000                                KMKI Ceiling : Rp4,432,000
   Keperluan       : Untuk   meng-cover   adanya                Purpose       : To cover the existing BG and
                     Bank Garansi dan hanya dapat                               can only be used as an
                     digunakan untuk addendum                                   addendum to the existing
                                                           128

Page 138
PT WIJAYA KARYA (PERSERO) Tbk                                                                PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                          AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                       NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                                   FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                                     For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                              June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                                            And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                                           Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                                         (In Thousand Rupiah, unless Otherwise Stated)
                     atas proyek eksisting agar tidak                                               project so that there is no
                     terjadi klaim bank garansi.                                                    guarantee bank claim
      Jangka Waktu : 20 November 2024 – 3 Maret                              Duration             : November 20, 2024 – March
                     2026                                                                           3, 2026
      Jaminan      : Sesuai dan terkait dengan                               Collateral           : In accordance with and related
                     agunan fasilitas KMK Co                                                        to the collateral of the KMK Co
                     Menurun                                                                        Decreased facilities

Fasilitas kredit dijamin dengan:                                        These credit facilities are collateralized with:
1. Fidusia Piutang usaha Surat Jaminan Fidusia                          1. Fiduciary     Accounts       Receivable       Fiduciary
     No.W10.00353054.AH.05.01 tanggal 17 Januari                           Guarantee Letter No. W10.00353054.AH.05.01
     2024 dengan nilai Rp12.535.000;                                       dated January 17, 2024 with a value of
                                                                           Rp12,535,000;
 2. Fidusia Piutang Usaha dan Tagihan kepada                            2. Fiduciary account receivables and bills to
    pemberi kerja maupun distributor yang telah                            employers and distributors that have been and/or
    dan/atau akan dibiayai oleh BRI, nomor                                 will be financed by BRI, binding number PJF
    pengikatan PJF W10.00637599.AH.05.01 19                                W10.00637599.AH.05.01 December 19, 2023
    Desember 2023 senilai Rp50.655.000;                                    worth Rp50,655,000;
 3. Fidusia Persediaan No. W11.01105950.AH.                             3. Inventory Fiduciary No. W11.01105950.AH.05.02
    05.02 tanggal 27 Juli 2018 dengan nilai                                dated July 27, 2018 with a value of
    Rp23.731.000;                                                          Rp23,731,000; and
 4. Fidusia bangunan dan sarana perlengkapan                            4. The fiduciary building and equipment facilities on
    atas nama Winner berlokasi di Jl. Siliwangi                            behalf of Winner are located on Jl. Siliwangi
    Km.26 Kelurahan Kemang Kuning, Kecamatan                               Km.26 Kembang Kuning Village, Klapanunggal
    Klapanunggal, Bogor, Jawa Barat berdasarkan                            District, Bogor, West Java based on a fiduciary
    sertifikat fidusia No. W10.00033817.AH.05.02                           certificate No. W10.00033817.AH.05.02 YEAR
    TAHUN 2024 tanggal 17 Januari 2024 dengan                              2024 dated January 17, 2024 with a value of
    nilai Rp4.008.000.                                                     Rp4,008,000.

38.     Obligasi dan Sukuk Mudharabah                                                           38. Bond and Sukuk Mudharabah
a. Obligasi                                                                                                       a. Bonds Payable
                                                     2026                           2025
                                                      Rp                             Rp
Obligasi                                            8.003.880.000                8.003.880.000                                    Bond
Dikurangi:                                                                                                                        Less:
  Biaya Emisi yang Belum
     Diamortisasi                                     (13.413.090)                 (17.318.009)          Unamortized Issuance Cost
                                                    7.990.466.910                7.986.561.991
Bagian Jangka Pendek
  dari Obligasi                                     (197.000.000)               (1.437.500.000)                 Current Portion of Bond
Total                                               7.793.466.910                 6.549.061.991                                    Total


Rincian obligasi pada 30 Juni 2026 adalah sebagai                      The detail of bonds as of June 30, 2026 is as follows:
berikut:
                                                                    2026
                        Uraian / Description                           Peringkat/      Jatuh Tempo/      Tingkat Bunga/      Pokok/
                                                                         Rating          Maturity         Interest Rate     Principal
Obligasi Berkelanjutan I Wijaya Karya Tahap I Tahun 2020 Seri A           idD         18 Des/ Dec 2027       8,60%            231.000.000
Obligasi Berkelanjutan I Wijaya Karya Tahap I Tahun 2020 Seri B           idD         18 Des/ Dec 2027       9,25%            429.000.000
Obligasi Berkelanjutan I Wijaya Karya Tahap I Tahun 2020 Seri C           idD         18 Des/ Dec 2027       9,85%            740.000.000
Obligasi Berkelanjutan I Wijaya Karya Tahap II Tahun 2021 Seri A          idD          3 Mar/ Mar 2028       8,50%            495.000.000
Obligasi Berkelanjutan I Wijaya Karya Tahap II Tahun 2021 Seri B          idD          3 Mar/ Mar 2028       9,10%            745.500.000
Obligasi Berkelanjutan I Wijaya Karya Tahap II Tahun 2021 Seri C          idD          3 Mar/ Mar 2028       9,75%          1.259.500.000
Obligasi Berkelanjutan II Wijaya Karya Tahap I Tahun 2021 Seri B          idD          8 Sep/ Sep 2026       8,55%            197.000.000
Obligasi Berkelanjutan II Wijaya Karya Tahap I Tahun 2021 Seri C          idD          8 Sep/ Sep 2028       9,25%            982.000.000
Obligasi Berkelanjutan II Wijaya Karya Tahap II Tahun 2022 Seri A         idD         18 Feb/ Feb 2027       6,50%            583.768.000
Obligasi Berkelanjutan II Wijaya Karya Tahap II Tahun 2022 Seri B         idD         18 Feb/ Feb 2027       7,75%            723.611.714
Obligasi Berkelanjutan II Wijaya Karya Tahap II Tahun 2022 Seri C         idD         18 Feb/ Feb 2029       8,30%            412.620.286
Obligasi Berkelanjutan III Wijaya Karya Tahap I Tahun 2022 Seri A         idD          3 Nov/ Nov 2027       9,90%            479.800.000
Obligasi Berkelanjutan III Wijaya Karya Tahap I Tahun 2022 Seri B         idD          3 Nov/ Nov 2027      10,50%            275.230.000
Obligasi Berkelanjutan III Wijaya Karya Tahap I Tahun 2022 Seri C         idD          3 Nov/ Nov 2029      10,90%            449.850.000
                                                                                                                            8.003.880.000



                                                                    129

Page 139
PT WIJAYA KARYA (PERSERO) Tbk                                                            PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                      AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                   NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                               FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                                   For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                            June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                                          And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                                         Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                                       (In Thousand Rupiah, unless Otherwise Stated)
Berdasarkan Covernote Notaris Humberg Lie, S.H.,                           Based on the Covernote of Notary Humberg Lie,
S.E., M.K.n., No. 021/KET-N/X/2025 tanggal                                 S.H., S.E., M.K.n., No. 021/KET-N/X/2025 dated
21 Oktober 2025, telah diadakan Rapat Umum                                 October 21, 2025, a General Meeting of Bondholders
Pemegang      Obligasi     (RUPO)   atas   Obligasi                        (RUPO) was held for Sustainable Bonds III Wijaya
Berkelanjutan III Wijaya Karya Tahap I Tahun 2022                          Karya Phase I 2022 with the result of agreeing on
dengan hasil menyetujui tanggal pelunasan pokok                            the principal repayment date for Sustainable Bonds
Obligasi Berkelanjutan III WIKA Tahap I 2022 Seri A                        III WIKA Phase I 2022 Series A to be November 3,
menjadi 3 November 2027.                                                   2027.

Berdasarkan Covernote Notaris Humberg Lie, S.H.,                           Based on the Covernote of Notary Humberg Lie,
S.E., M.K.n., No. 020/KET-N/X/2025 tanggal                                 S.H., S.E., M.K.n., No. 020/KET-N/X/2025 dated
21 Oktober 2025, telah diadakan Rapat Umum                                 October 21, 2025, a General Meeting of Bondholders
Pemegang      Obligasi   (RUPO)   atas   Obligasi                          (RUPO) was held for Sustainable Bonds I Wijaya
Berkelanjutan I Wijaya Karya Tahap I Tahun 2020                            Karya Phase I 2020 series with the result of agreeing
seri dengan hasil menyetujui tanggal pelunasan                             on the principal repayment date for Sustainable
pokok Obligasi Berkelanjutan I WIKA Tahap I 2020                           Bonds I WIKA Phase I 2020 Series A and B to be
Seri A dan B menjadi 18 Desember 2027.                                     December 18, 2027.

Berdasarkan Covernote Notaris Humberg Lie, S.H.,                           Based on the Covernote of Notary Humberg Lie,
S.E., M.K.n., No. 007/KET-N/IV/2025 tanggal                                S.H., S.E., M.K.n., No. 007/KET-N/IV/2025 dated
21 April 2025, telah diadakan Rapat Umum                                   April 21, 2025, a General Meeting of Bondholders
Pemegang      Obligasi    (RUPO)   atas    Obligasi                        (RUPO) was held for Sustainable Bonds II Wijaya
Berkelanjutan II Wijaya Karya Tahap II Tahun 2022                          Karya Phase II 2022 with the result of agreeing on
dengan hasil menyetujui tanggal pelunasan pokok                            the principal repayment date for Sustainable Bonds II
Obligasi Berkelanjutan II WIKA Tahap II Tahun 2022                         WIKA Phase II 2022 Series A to be February 18,
Seri A menjadi 18 Februari 2027.                                           2027.
Selama tahun 2025, terdapat opsi beli yang                                 On 2025, there are call option exercised by the
dilakukan   oleh    Perusahaan    untuk    Obligasi                        Company, for Obligasi Berkelanjutan II Wijaya Karya
Berkelanjutan II Wijaya Karya Tahap II Tahun 2022                          Tahap II Tahun 2022 Seri A, B and C, amounting to
Seri A, B, dan C, masing-masing sebesar                                    Rp10,182,000, Rp7,288,286 and Rp12,529,714,
Rp10.182.000, Rp7.288.286, dan Rp12.529.714.                               respectively.
Rincian obligasi pada 31 Desember 2025 adalah                           The detail of bonds as of December 31, 2025 is as
sebagai berikut:                                                        follows:
                                                                     2025
                         Uraian / Description                           Peringkat/    Jatuh Tempo/          Tingkat Bunga/        Pokok/
                                                                          Rating        Maturity             Interest Rate       Principal
Obligasi Berkelanjutan I Wijaya Karya Tahap I Tahun 2020 Seri A              idD     18 Des/ Dec 2027           8,60%              231.000.000
Obligasi Berkelanjutan I Wijaya Karya Tahap I Tahun 2020 Seri B              idD     18 Des/ Dec 2027           9,25%              429.000.000
Obligasi Berkelanjutan I Wijaya Karya Tahap I Tahun 2020 Seri C              idD     18 Des/ Dec 2027           9,85%              740.000.000
Obligasi Berkelanjutan I Wijaya Karya Tahap II Tahun 2021 Seri A             idD      3 Mar/ Mar 2026           8,50%              495.000.000
Obligasi Berkelanjutan I Wijaya Karya Tahap II Tahun 2021 Seri B             idD      3 Mar/ Mar 2026           9,10%              745.500.000
Obligasi Berkelanjutan I Wijaya Karya Tahap II Tahun 2021 Seri C             idD      3 Mar/ Mar 2028           9,75%            1.259.500.000
Obligasi Berkelanjutan II Wijaya Karya Tahap I Tahun 2021 Seri B             idD      8 Sep/ Sep 2026           8,55%              197.000.000
Obligasi Berkelanjutan II Wijaya Karya Tahap I Tahun 2021 Seri C             idD      8 Sep/ Sep 2028           9,25%              982.000.000
Obligasi Berkelanjutan II Wijaya Karya Tahap II Tahun 2022 Seri A            idD     18 Feb/ Feb 2027           6,50%              583.768.000
Obligasi Berkelanjutan II Wijaya Karya Tahap II Tahun 2022 Seri B            idD     18 Feb/ Feb 2027           7,75%              723.611.714
Obligasi Berkelanjutan II Wijaya Karya Tahap II Tahun 2022 Seri C            idD     18 Feb/ Feb 2029           8,30%              412.620.286
Obligasi Berkelanjutan III Wijaya Karya Tahap I Tahun 2022 Seri A            idD      3 Nov/ Nov 2027           9,90%              479.800.000
Obligasi Berkelanjutan III Wijaya Karya Tahap I Tahun 2022 Seri B            idD      3 Nov/ Nov 2027          10,50%              275.230.000
Obligasi Berkelanjutan III Wijaya Karya Tahap I Tahun 2022 Seri C            idD      3 Nov/ Nov 2029          10,90%              449.850.000
                                                                                                                                 8.003.880.000



Pihak-pihak yang terlibat dalam penerbitan obligasi                        The parties involved in the issuance of bonds are as
adalah sebagai berikut:                                                    follows:
                                                                      Perusahaan
                Keterangan/                       Wali Amanat/       Pemeringkat/            Underwriter/                    Notaris/
                Description                         Trustee         Rating Company           Underwriter                     Notary
Obligasi Berkelanjutan I                                                             PT BNI Sekuritas
 W ijaya Karya Tahap I Tahun 2020                                                    PT BRI Danareksa Sekuritas        Ir. Nanette Cahyanie
                                                PT Bank Mega Tbk      PT Pefindo
                                                                                     PT Mandiri Sekuritas            Handari Adi W arsito, S.H.
                                                                                     PT RHB Sekuritas Indonesia
Obligasi Berkelanjutan I                                                             PT BNI Sekuritas
 W ijaya Karya Tahap II Tahun 2021                                                   PT BRI Danareksa Sekuritas        Ir. Nanette Cahyanie
                                                PT Bank Mega Tbk      PT Pefindo
                                                                                     PT Mandiri Sekuritas            Handari Adi W arsito, S.H.
                                                                                     PT RHB Sekuritas Indonesia
Obligasi Berkelanjutan II                                                            PT BNI Sekuritas
 W ijaya Karya Tahap I Tahun 2021                                                    PT BRI Danareksa Sekuritas        Ir. Nanette Cahyanie
                                                PT Bank Mega Tbk      PT Pefindo
                                                                                     PT Mandiri Sekuritas            Handari Adi W arsito, S.H.
                                                                                     PT RHB Sekuritas Indonesia
Obligasi Berkelanjutan II                                                            PT BNI Sekuritas
 W ijaya Karya Tahap II Tahun 2022                                                   PT BRI Danareksa Sekuritas        Ir. Nanette Cahyanie
                                                PT Bank Mega Tbk      PT Pefindo
                                                                                     PT Mandiri Sekuritas            Handari Adi W arsito, S.H.
                                                                                     PT RHB Sekuritas Indonesia
Obligasi Berkelanjutan III                                                           PT BNI Sekuritas
 W ijaya Karya Tahap I Tahun 2022                                                    PT BRI Danareksa Sekuritas        Ir. Nanette Cahyanie
                                                PT Bank Mega Tbk      PT Pefindo
                                                                                     PT Mandiri Sekuritas            Handari Adi W arsito, S.H.
                                                                                     PT RHB Sekuritas Indonesia


                                                                     130

Page 140
PT WIJAYA KARYA (PERSERO) Tbk                                                                    PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                              AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                           NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                                       FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                                            For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                                     June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                                                   And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                                                  Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                                                (In Thousand Rupiah, unless Otherwise Stated)

b. Sukuk Mudharabah                                                            b. Sukuk Mudharabah

                                                          2026                         2025
                                                           Rp                           Rp

Sukuk Mudharabah                                         2.272.315.000                 2.272.315.000                            Sukuk Mudharabah
Sukuk Mudharabah                                                                                                                    Current Portion of
  Yang Akan Jatuh Tempo                                    (91.500.000)           (1.118.625.000)                            Sukuk Mudharabah
                                                         2.180.815.000                 1.153.690.000


Rincian sukuk mudharabah pada 30 Juni 2026 dan                              The detail of sukuk mudharabah as of June
31 Desember 2025 adalah sebagai berikut:                                    30, 2026 and December 31, 2025 are as follows:
                                                                        2026
                             Uraian / Description                                Peringkat/        Jatuh Tempo/           Nisbah/            Pokok/
                                                                                  Rating             Maturity             Nisbah            Principal
Sukuk Mudharabah Berkelanjutan I Wijaya Karya Tahap I Tahun 2020 Seri B            idD(sy)       18 Des/ Dec 2027         38,54%              159.000.000
Sukuk Mudharabah Berkelanjutan I Wijaya Karya Tahap I Tahun 2020 Seri C            idD(sy)       18 Des/ Dec 2027         41,04%              157.000.000
Sukuk Mudharabah Berkelanjutan I Wijaya Karya Tahap II Tahun 2021 Seri A           idD(sy)        3 Mar/ Mar 2028         37,28%              134.300.000
Sukuk Mudharabah Berkelanjutan I Wijaya Karya Tahap II Tahun 2021 Seri B           idD(sy)        3 Mar/ Mar 2028         39,91%              211.600.000
Sukuk Mudharabah Berkelanjutan I Wijaya Karya Tahap II Tahun 2021 Seri C           idD(sy)        3 Mar/ Mar 2028         42,76%              154.100.000
Sukuk Mudharabah Berkelanjutan II Wijaya Karya Tahap I Tahun 2021 Seri B           idD(sy)        8 Sep/ Sep 2026         61,07%               91.500.000
Sukuk Mudharabah Berkelanjutan II Wijaya Karya Tahap I Tahun 2021 Seri C           idD(sy)        8 Sep/ Sep 2028         66,07%              333.000.000
Sukuk Mudharabah Berkelanjutan II Wijaya Karya Tahap II Tahun 2022 Seri A          idD(sy)       18 Feb/ Feb 2027         51,17%              412.900.000
Sukuk Mudharabah Berkelanjutan II Wijaya Karya Tahap II Tahun 2022 Seri B          idD(sy)       18 Feb/ Feb 2027         64,58%              176.050.000
Sukuk Mudharabah Berkelanjutan II Wijaya Karya Tahap II Tahun 2022 Seri C          idD(sy)       18 Feb/ Feb 2029         69,17%              161.050.000
Sukuk Mudharabah Berkelanjutan III Wijaya Karya Tahap I Tahun 2022 Seri A          idD(sy)        3 Nov/ Nov 2027         66,00%              109.325.000
Sukuk Mudharabah Berkelanjutan III Wijaya Karya Tahap I Tahun 2022 Seri B          idD(sy)        3 Nov/ Nov 2027         70,00%               32.000.000
Sukuk Mudharabah Berkelanjutan III Wijaya Karya Tahap I Tahun 2022 Seri C          idD(sy)        3 Nov/ Nov 2029         72,67%              140.490.000
                                                                                                                                            2.272.315.000


                                                                        2025
                             Uraian / Description                                Peringkat/       Jatuh Tempo/            Nisbah/            Pokok/
                                                                                  Rating            Maturity              Nisbah            Principal
Sukuk Mudharabah Berkelanjutan I Wijaya Karya Tahap I Tahun 2020 Seri B           idD(sy)        18 Des/ Dec 2025         38,54%             159.000.000
Sukuk Mudharabah Berkelanjutan I Wijaya Karya Tahap I Tahun 2020 Seri C           idD(sy)        18 Des/ Dec 2027         41,04%             157.000.000
Sukuk Mudharabah Berkelanjutan I Wijaya Karya Tahap II Tahun 2021 Seri A          idD(sy)         3 Mar/ Mar 2026         37,28%             134.300.000
Sukuk Mudharabah Berkelanjutan I Wijaya Karya Tahap II Tahun 2021 Seri B          idD(sy)         3 Mar/ Mar 2026         39,91%             211.600.000
Sukuk Mudharabah Berkelanjutan I Wijaya Karya Tahap II Tahun 2021 Seri C          idD(sy)         3 Mar/ Mar 2028         42,76%             154.100.000
Sukuk Mudharabah Berkelanjutan II Wijaya Karya Tahap I Tahun 2021 Seri B          idD(sy)         8 Sep/ Sep 2026         61,07%              91.500.000
Sukuk Mudharabah Berkelanjutan II Wijaya Karya Tahap I Tahun 2021 Seri C          idD(sy)         8 Sep/ Sep 2028         66,07%             333.000.000
Sukuk Mudharabah Berkelanjutan II Wijaya Karya Tahap II Tahun 2022 Seri A         idD(sy)        18 Feb/ Feb 2025         51,17%             412.900.000
Sukuk Mudharabah Berkelanjutan II Wijaya Karya Tahap II Tahun 2022 Seri B         idD(sy)        18 Feb/ Feb 2027         64,58%             176.050.000
Sukuk Mudharabah Berkelanjutan II Wijaya Karya Tahap II Tahun 2022 Seri C         idD(sy)        18 Feb/ Feb 2029         69,17%             161.050.000
Sukuk Mudharabah Berkelanjutan III Wijaya Karya Tahap I Tahun 2022 Seri A         idD(sy)         3 Nov/ Nov 2025         66,00%             109.325.000
Sukuk Mudharabah Berkelanjutan III Wijaya Karya Tahap I Tahun 2022 Seri B         idD(sy)         3 Nov/ Nov 2027         70,00%              32.000.000
Sukuk Mudharabah Berkelanjutan III Wijaya Karya Tahap I Tahun 2022 Seri C         idD(sy)         3 Nov/ Nov 2029         72,67%             140.490.000
                                                                                                                                           2.272.315.000


Pihak-pihak yang terlibat dalam penerbitan sukuk                            The parties involved in the issuance of sukuk
mudharabah adalah sebagai berikut:                                          mudharabah are as follows:
                                                                         Perusahaan
                 Keterangan/                          Wali Amanat/      Pemeringkat/                 Underwriter/                       Notaris/
                 Description                            Trustee        Rating Company                Underwriter                        Notary
Sukuk Mudharabah Berkelanjutan I                                                             PT BNI Sekuritas
 Wijaya Karya Tahap I Tahun 2020                                                             PT BRI Danareksa Sekuritas          Ir. Nanette Cahyanie
                                                    PT Bank Mega Tbk      PT Pefindo
                                                                                             PT Mandiri Sekuritas              Handari Adi Warsito, S.H.
                                                                                             PT RHB Sekuritas Indonesia
Sukuk Mudharabah Berkelanjutan I                                                             PT BNI Sekuritas
 Wijaya Karya Tahap II Tahun 2021                                                            PT BRI Danareksa Sekuritas          Ir. Nanette Cahyanie
                                                    PT Bank Mega Tbk      PT Pefindo
                                                                                             PT Mandiri Sekuritas              Handari Adi Warsito, S.H.
                                                                                             PT RHB Sekuritas Indonesia
Sukuk Mudharabah Berkelanjutan II                                                            PT BNI Sekuritas
 Wijaya Karya Tahap I Tahun 2021                                                             PT BRI Danareksa Sekuritas          Ir. Nanette Cahyanie
                                                    PT Bank Mega Tbk      PT Pefindo
                                                                                             PT Mandiri Sekuritas              Handari Adi Warsito, S.H.
                                                                                             PT RHB Sekuritas Indonesia
Sukuk Mudharabah Berkelanjutan II                                                            PT BNI Sekuritas
 Wijaya Karya Tahap II Tahun 2021                                                            PT BRI Danareksa Sekuritas          Ir. Nanette Cahyanie
                                                    PT Bank Mega Tbk      PT Pefindo
                                                                                             PT Mandiri Sekuritas              Handari Adi Warsito, S.H.
                                                                                             PT RHB Sekuritas Indonesia
Sukuk Mudharabah Berkelanjutan III                                                           PT BNI Sekuritas
 Wijaya Karya Tahap I Tahun 2022                                                             PT BRI Danareksa Sekuritas          Ir. Nanette Cahyanie
                                                    PT Bank Mega Tbk      PT Pefindo
                                                                                             PT Mandiri Sekuritas              Handari Adi Warsito, S.H.
                                                                                             PT RHB Sekuritas Indonesia

                                                                        131

Page 141
PT WIJAYA KARYA (PERSERO) Tbk                                                            PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                      AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                   NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                               FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                                   For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                            June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                                          And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                                         Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                                       (In Thousand Rupiah, unless Otherwise Stated)
Akad Syariah yang digunakan dalam penerbitan                          Sharia contract used in the issuance of Sukuk
Sukuk Mudharabah dengan menggunakan akad                              Mudharabah using the mudharabah contract. The
mudharabah. Akad mudharabah adalah akad                               mudharabah contract is a cooperation agreement
kerjasama antara pihak pemilik dana (shahibul mal)                    between the owner of the fund (shahibul mal) and the
dengan pengelola (mudharib). Shohibul mal                             manager (mudharib). Shohibul mall hands over the
menyerahkan dana sedangkan mudharib mengelola                         funds while mudharib manages the funds. Profits are
dana tersebut. Keuntungan dibagi berdasarkan                          shared based on agreement (profit sharing ratio). The
kesepakatan (nisbah bagi hasil). Akad mudharabah                      mudharabah agreement has been embedded in the
telah termaktub (embedded) dalam Perjanjian                           Issuance Agreement (Sukuk Mudharabah Trustee
Penerbitan (Perjanjian Perwaliamanatan Sukuk                          Agreement).
Mudharabah).

Nisbah merupakan bagian Pendapatan Bagi Hasil                         Nisbah Is a portion of Revenue Sharing which is the
yang menjadi hak dan oleh karenanya harus                             right and therefore must be paid by the Company to
dibayarkan oleh Perusahaan kepada Pemegang                            the Sukuk Mudharabah Holder in the form of a certain
Sukuk Mudharabah berupa persentase tertentu dari                      percentage of the Shared Revenue that the Company
Pendapatan Yang Dibagihasilkan yang disepakati                        agrees to be paid to the Sukuk Mudharabah Holder.
Perusahaan untuk dibayarkan kepada Pemegang                           The Company does not deduct zakat on the Sukuk
Sukuk Mudharabah. Perusahaan tidak melakukan                          Mudharabah profit sharing obtained by the Sukuk
pemotongan zakat atas bagi hasil Sukuk Mudharabah                     Holder.
yang diperoleh Pemegang Sukuk.

Perusahaan juga diwajibkan untuk mempertahankan                       The Company is also required to maintain certain
rasio-rasio keuangan tertentu berdasarkan laporan                     financial ratios based on annual financial reports that
keuangan tahunan yang telah diaudit oleh kantor                       had been audited by a public accounting firm
akuntan publik yang terdaftar di OJK selama periode                   registered with the OJK during the bond and sukuk
utang obligasi dan sukuk mudharabah ini sebagai                       mudharabah period as follows:
berikut:
 •   Perbandingan aset lancar dan liabilitas lancar                     •      Minimum ratio of current asset and current
     (current ratio) tidak kurang dari 100%;                                   liabilities (current ratio) is 100%;
 •   Perbandingan total Liabilitas dengan total                         •      Maximum ratio of total liabilities to total equity
     Ekuitas (interest bearing debt to equity ratio)                           (interest bearing debt to equity ratio) is 2.50x;
     tidak lebih dari 2,50x; dan                                               and
 •   Perbandingan antara EBITDA dengan beban                            •      Minimum ratio of EBITDA to loan interest
     bunga pinjaman tidak kurang dari 1,00x.                                   expense is 1.00x.

39.   Modal Saham                                                                                                  39. Share Capital

Sesuai dengan daftar pemegang saham yang                              Based on the list of shareholders issued by Biro
dikeluarkan oleh Biro Administrasi Efek Perusahaan,                   Administrasi Efek Perusahaan (Administration Office
PT Datindo Entrycom, susunan pemegang saham                           of Listed Shares of the Company), PT Datindo
Perusahaan pada tanggal 30 Juni 2026 adalah                           Entrycom, the composition of shareholders of the
sebagai berikut:                                                      Company on June 30, 2026 is as follows:
                                                                  2026
                                               Total          Persentase        Total Modal
                                              Saham/         Kepemilikan/         Saham/
                                             Number of       Percentage of      Total Capital
                                              Shares          Ownership           Shares
                                                                  %                  Rp
Saham Preferen                                                                                                                Prefered Stock
  (Seri A Dwiwarna)                                      1              0,00                0,1                        (Series A Dwiwarna)
  Pemerintah Republik Indonesia                                                                                      Indonesian Goverment
Saham Biasa (Seri B)                                                                                                Common Stock (Series B)
  PT Danantara Asset Management (Persero)   35.928.785.753              0,90      3.592.878.575   PT Danantara Asset Management (Persero)
  Badan Pengaturan BUMN                        362.917.027              0,01         36.291.703                   Badan Pengaturan BUMN
Direksi                                                                                                                              Director:
  I Ketut Pasek Senjaya Putra                                                                                           Agung Budi Waskito
     (Direktur Utama)                                  100              0,00                 10                       (President Director)
  Hananto Aji                                    1.269.000              0,00            126.900                                 Hananto Aji
  Hadjar Seti Adji                                 510.000              0,00             51.000                             Hadjar Seti Adji
Masyarakat                                   3.579.581.979              0,09        357.958.198                                         Public
Total                                       39.873.063.860              1,00      3.987.306.386                                          Total

                                                                  132

Page 142
PT WIJAYA KARYA (PERSERO) Tbk                                                           PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                     AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                  NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                              FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                                  For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                           June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                                         And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                                        Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                                      (In Thousand Rupiah, unless Otherwise Stated)

Berdasarkan Akta Rapat Umum Pemegang Saham                             Based on the Deed of the Extraordinary General
Luar Biasa No.7 tanggal 17 Januari 2024 yang dibuat                    Meeting of Shareholders No.7 dated January 17,
dihadapan Notaris Fathiah Helmi, S.H., di Jakarta,                     2024 made in presence of Notary Fathiah Helmi,
menyetujui peningkatan modal dasar semula                              S.H., in Jakarta, approved an increase in the original
Rp3.500.000.000 menjadi Rp27.500.000.000. Akta                         authorized     capital   of   Rp3,500,000,000       to
tersebut telah mendapat Penerimaan Pemberitahuan                       Rp27,500,000,000. This deed has received
Perubahan Data Perseroan dari Menteri Hukum dan                        Notification of Changes to Company Data from the
Hak Asasi Manusia Republik Indonesia No. AHU-                          Minister of Law and Human Rights of the Republic of
0003965.AH.01.02.TAHUN 2024 tanggal 17 Januari                         Indonesia No. AHU-0003965.AH.01.02.TAHUN 2024
2024.                                                                  dated January 17, 2024.

Berdasarkan   Peraturan   Pemerintah   Republik                        Based on the Government Regulation of the
Indonesia    No.15    Tahun     2024    tanggal                        Republic of Indonesia No. 15 Year 2024 dated March
28 Maret 2024 tentang Penambahan Penyertaan                            28, 2024 concerning Addition of State Capital of the
Modal Negara Republik Indonesia Ke Dalam Modal                         Republic of Indonesia to Company Share Capital, the
Saham Perusahaan, Negara Republik Indonesia                            Republic of Indonesia has added state capital
melakukan penambahan penyertaan modal negara                           participation to the Company's share capital
ke dalam modal saham Perusahaan sebesar                                amounting to Rp6,000,000,000 sourced from the
Rp6.000.000.000 yang bersumber dari Anggaran                           Revenue Budget and State Expenditures for Fiscal
Pendapatan dan Belanja Negara Tahun Anggaran                           Year 2024.
2024.

Berdasarkan Akta Rapat Umum Pemegang Saham                             Based on the Deed of the Extraordinary General
Luar Biasa No.37 tanggal 26 Juni 2024 yang dibuat                      Meeting of Shareholders No.37 dated June 26, 2024
dihadapan Notaris Fathiah Helmi, S.H., di Jakarta,                     made before Notary Fathiah Helmi, S.H., in Jakarta,
menyetujui peningkatan modal ditempatkan dan                           approved an increase in issued and paid-up capital
disetor melalui Hak Pemesanan Efek Terlebih                            through Pre-emptive Rights II (“PMHMETED II”)
Dahulu     II    (“PMHMETED        II”)   sebesar                      amounting to Rp3,090,311,249, therefore the
Rp3.090.311.249, sehingga susunan pemegang                             composition of shareholders in the Company as of
saham pada Perusahaan per 31 Desember 2025                             December 31, 2025 is:
menjadi:
                                                                  2025
                                               Total          Persentase       Total Modal
                                              Saham/         Kepemilikan/        Saham/
                                             Number of       Percentage of     Total Capital
                                              Shares          Ownership          Shares
                                                                  %                 Rp
Saham Preferen                                                                                                               Prefered Stock
  (Seri A Dwiwarna)                                      1              0,00               0,1                        (Series A Dwiwarna)
  Pemerintah Republik Indonesia                                                                                     Indonesian Goverment
Saham Biasa (Seri B)                                                                                               Common Stock (Series B)
  PT Danantara Asset Management (Persero)   36.291.702.780              0,91    3.629.170.278    PT Danantara Asset Management (Persero)
Direksi                                                                                                                             Director:
  Agung Budi Waskito                                                                                                   Agung Budi Waskito
     (Direktur Utama)                            1.434.200              0,00          143.420                        (President Director)
  Hananto Aji                                    1.269.000              0,00          126.900                                  Hananto Aji
  Sumadi                                           850.000              0,00           85.000                                      Sumadi
  Hadjar Seti Adji                                 510.000              0,00           51.000                              Hadjar Seti Adji
Masyarakat                                   3.577.297.877              0,09      357.729.788                                          Public
Total                                       39.873.063.858              1,00    3.987.306.386                                           Total


Selisih atas transaksi penerimaan penyertaan modal                      The difference between the transaction of receiving
negara dengan modal ditempatkan dan disetor                             state capital participation and the issued and paid-up
dicatatkan sebagai tambahan modal disetor                               capital is recorded as additional paid-up capital
(Catatan 41).                                                           (Note 41).




                                                                  133

Page 143
PT WIJAYA KARYA (PERSERO) Tbk                                                                    PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                              AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                           NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                                       FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                                            For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                                     June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                                                   And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                                                  Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                                                (In Thousand Rupiah, unless Otherwise Stated)
Mutasi     saham     beredar    pada     tanggal                             The movement of outstanding shares as of June 30,
30 Juni 2026 dan 31 Desember 2025 adalah sebagai                             2026 and December 31, 2025, are as follows:
berikut:
                                                       2026                       2025
                                              (Lembar saham/ shares )    (Lembar saham/ shares )

Saldo Awal Saham Beredar                               39.873.063.858                  39.873.063.858       Beginning Balance of Outstanding Shares
Penambahan Penerbitan Saham Baru                                    --                              --              Addition Issuance of New Shares
Saldo Akhir Saham Beredar                              39.873.063.858                  39.873.063.858       Ending Balance of Outstanding Shares


40. Modal Saham yang Diperoleh Kembali                                                                                   40. Treasury Stock
Berdasarkan Undang-Undang No. 40 tahun 2007                              Based on Law No. 40 Year 2007 regarding Limited
tentang Perseroan Terbatas Pasal 37 ("UU No.40                           Liability Companies in Article 37 ("Law No.40 Year
Tahun 2007”) dan lampiran Keputusan Ketua Badan                          2007) and Attachment of Decree of Chairman of
Pengawas Pasar Modal dan Lembaga Keuangan                                Supervisory agency for capital market and financial
No. KEP-401/BL/2008 Peraturan XI.B.3: Pembelian                          institution No. KEP-401/BL/2008 of Regulation
Kembali Saham Emiten atau Perseroan Publik Dalam                         XI.B.3: Emiten Stock Repurchasor Public Company.
Kondisi Pasar yang berpotensi Krisis, Perusahaan                         in crisis potential market condition, the Company
memutuskan     untuk    melaksanakan     Program                         shall decide to implement Stock Buyback Program.
Pembelian Kembali Saham (Buyback).
Pada tanggal 12 Maret 2020, Perusahaan                                   On March 12, 2020, the Company reported to the
melaporkan ke OJK tentang rencana pembelian                              OJK regarding the plan to repurchase the
kembali saham Perusahaan dengan nomor surat:                             Company's      shares    with    letter   number:
SE.01.01/A.SEKPER.00306/2020 dengan periode                              SE.01.01/A.SEKPER.00306/2020 with the purchase
pelaksanaan pembelian dari tanggal 12 Maret 2020                         period from March 12, 2020 to March 31, 2020.
sampai dengan 31 Maret 2020.

Pada tanggal saham-saham yang diperoleh kembali                          Reacquired shares shall be recorded using par
tersebut dicatat dengan menggunakan metode nilai                         value method and preserved as follows:
nominal (par value method) dan disajikan sebagai
berikut:
                                    Total            Nilai perolehan         Nilai Nominal/          Tambahan
                                   Saham/                kembali/              Par Value           Modal Disetor/
                                  Number of          Buyback value                                   Additional
                                   Shares                                                          Paid in Capital
                                                           Rp                     Rp                     Rp
Periode Buy Back                                                                                                                      Buyback Period
 Pemerintah
  Tanggal 12 Republik
             s/ d 31 Maret
                      Indonesia
                           2020       1.100.000              (917.558)              (110.000)              (807.558)         March 12 until 31, 2020



Selisih hasil pembelian kembali sebesar Rp807.558                            Gain from the buyback amounted to Rp807,558
dicatat sebagai tambahan modal disetor pada laporan                          recorded as additional paid in capital in the
perubahan ekuitas konsolidasian.                                             consolidated statement of changes in equity.

Manajemen melakukan Program Pembelian Kembali                                Management conducted a Share Buyback Program
Saham (Buyback) untuk menjaga stabilitas harga                               (Buyback) to maintain stock price stability,
saham mengingat pada saat aksi korporasi                                     considering that when the corporate action was
diumumkan, harga saham tidak mencerminkan                                    announced, the share price did not reflect the
kondisi fundamental dan prospek Perusahaan.                                  Company's fundamental conditions and prospects.
Pembelian kembali juga mengikuti arahan dari OJK                             The Buyback also follows the direction of the OJK as
yang tertuang pada edaran Nomor 3/SEOJK.04/2020                              outlined in letter No. 3/SEOJK.04/2020 on March 9,
pada 9 Maret 2020. Pembelian kembali saham                                   2020. Shares buyback hopefully can make stock
diharapkan dapat membuat pergerakan harga saham                              price movements positive.
menjadi positif.




                                                                       134

Page 144
PT WIJAYA KARYA (PERSERO) Tbk                                                  PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                            AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                         NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                     FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                         For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                  June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                                And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                               Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                             (In Thousand Rupiah, unless Otherwise Stated)
41. Tambahan Modal Disetor                                                             41. Additional Paid-In Capital

                                              2026                   2025
                                               Rp                     Rp

Agio Penawaran Terbatas 1                    5.867.110.854          5.867.110.854                       Right Issue Premium
Agio Penawaran Umum Saham                      590.769.280            590.769.280            Initial Public Offering Premium
Opsi Saham (Esop/Msop) Tahap 1                   9.829.400              9.829.400                    Stage 1 of ESOP/MSOP
Opsi Saham (Esop/Msop) Tahap 2                   8.281.950              8.281.950                    Stage 2 of ESOP/MSOP
Agio Opsi ESOP/MSOP                                                                            Premium From ESOP/MSOP
  Tahap 1 Dan 2                                  63.381.648             63.381.648                           Stage 1 and 2
Biaya Emisi Saham                              (15.798.010)           (15.798.010)                      Share Issuance Cost
Biaya Emisi Penawaran Terbatas 1               (41.004.523)           (41.004.523)                      Share Issuance Cost
Agio Penjualan Saham                                                                                Premium From Buy Back
  yang Diperoleh Kembali                         96.962.538             96.962.538                         Treasury Stocks
Akuisisi WIKA Bitumen                          (37.568.017)           (37.568.017)              Acquisition of Wika Bitumen
Selisih Aset dan Liabilitas                                                                       Difference of Tax Amnesty
  Pengampunan Pajak                              13.755.557            13.755.557                       Assets and Liabilities
Penjualan saham
  Diperoleh Kembali                                  585.618                585.618               Sales from treasury stock
Pembelian Saham
  Diperoleh Kembali                              (807.558)              (807.558)              Buyback from treasury stock
Penerimaan Tambahan Setoran Modal            2.997.601.911          2.997.601.911               Receipt from Paid in Capital
Selisih Nilai Transaksi                                                                Difference in Values of Restructuring
  Restrukturisasi Entitas                    (501.824.487)           (501.824.487)           Transaction of Entities Under
Biaya Emisi Penyertaan                                                                            State Capital Participation
  Modal Negara                                 (10.919.980)           (10.919.980)                         Issuance Costs
Total                                        9.040.356.181          9.040.356.181                                       Total


42. Rugi Bersih per Saham Dasar                                                                    42. Loss per Share

                                              2026                  2025

Rugi yang Digunakan
  Dalam Perhitungan (Rp)                  (1.482.264.363)        (1.663.281.360)             Loss Used in Calculation (Rp)
Jumlah Rata-rata Tertimbang                                                                    Weighted Average Number
  Saham (Lembar)                           39.873.063.860        39.873.063.860                    of Shares (Shares)
Rugi per Saham (Rp)                                                                                 Loss per Share (Rp)
  (Nilai Penuh)                                      (37,17)               (41,71)                      (Full Amount)


43.   Kepentingan Non Pengendali                                                        43. Non Controlling Interest

Saldo kepentingan non pengendali pada tanggal                  Balance of non controlling interest as of June 30,
30 Juni 2026 dan 31 Desember 2025 adalah sebagai               2026 and December 31, 2025 are as follows:
berikut:
                                          2026                     2025
                                           Rp                       Rp

                 WIKA Beton              1.592.963.059            1.590.417.178            WIKA Beton
                 WIKA Gedung               576.837.841              604.604.798          WIKA Gedung
                 WIKA Serpan               290.181.284              305.424.251           WIKA Serpan
                 WTJJ                       61.977.607               67.748.780                 WTJJ
                 WIKA Realty                (8.716.405)              16.006.896            WIKA Realty
                 WIKA Rekon                   2.052.954               1.356.549           WIKA Rekon
                 WIKA IKON                 (18.165.097)            (15.528.700)             WIKA IKON
                 Total                   2.497.131.243            2.570.029.752                    Total


                                                           135

Page 145
PT WIJAYA KARYA (PERSERO) Tbk                                                    PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                              AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                           NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                       FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                          For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                   June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                                 And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                                Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                              (In Thousand Rupiah, unless Otherwise Stated)
44. Pendapatan Neto                                                                                    44. Net Revenues

                                             2026                       2025
                                              Rp                         Rp

Infrastruktur dan Gedung                    3.382.378.945              2.343.690.060            Infrastructure and Building
Industri                                    1.484.500.501              1.613.708.407                               Industry
Energi dan Industrial Plant                 1.059.124.416              1.530.516.369            Energy and Industrial Plant
Hotel                                         116.244.178                112.970.415                                  Hotel
Realty dan Properti                            81.135.242                144.520.112                   Realty and Property
Investasi                                     156.020.173                112.778.632                            Investment
Total                                       6.279.403.455              5.858.183.995                                  Total


Rincian pemberi kerja pendapatan neto Grup untuk                  Details of the project owners of the Group’s net
tahun-tahun yang berakhir pada 30 Juni 2026 dan                   revenues for the years ended June 30, 2026 and
2025 sebagai berikut:                                             2025 are as follows:

                                                                                       2026                   2025
                                                                                        Rp                     Rp
Pihak Berelasi (Catatan 52) / Related Parties (Note 52)                                1.741.096.612         2.226.564.821

Pihak Ketiga / Third Parties                                                           4.538.306.843         3.631.619.174
Total                                                                                  6.279.403.455         5.858.183.995


Terdapat transaksi penjualan yang melebihi 10%                    There are sale transactions that exceed 10% (ten
(sepuluh persen) dari pendapatan dari PT Jakarta                  percent) of revenue from PT Jakarta Propertindo.
Propertindo.

45. Beban Pokok Pendapatan                                                                       45. Cost of Revenues

                                             2026                       2025
                                              Rp                         Rp
Infrastruktur dan Gedung                    2.768.386.646              2.122.937.764             Infrastructure and Building
Industri                                    1.392.457.956              1.548.435.196                                Industry
Energi dan Industrial Plant                   916.686.983              1.368.052.221             Energy and Industrial Plant
Hotel                                         111.415.294                122.149.613                                   Hotel
Realty dan Properti                            76.924.849                111.766.913                    Realty and Property
Investasi                                     127.199.395                112.283.043                             Investment
Total                                       5.393.071.123              5.385.624.749                                  Total

Tidak terdapat transaksi pembelian yang melebihi                  There are no purchase transactions that exceed
10% (sepuluh persen) dari pendapatan.                             10% (ten percent) of revenue.
Dalam     beban    pokok    pendapatan     terdapat               In the cost of revenue there is depreciation of fixed
penyusutan aset tetap dan aset hak guna dan                       assets and right-of-use assets and amortization of
amortisasi aset takberwujud dengan rincian sebagai                intangible assets are as follows:
berikut:
                                             2026                       2025
                                              Rp                         Rp
Penyusutan                                                                                                     Depreciation
  Aset Tetap (Catatan 20)                     109.001.856                117.599.316              Fixed Assets (Note 20)
  Aset Hak Guna                                                                                     Right-of- Use Assets
    (Catatan 25)                                6.096.087                  2.396.444                          (Note 25)
Amortisasi (Catatan 24)                        58.862.261                 34.584.691              Amortization (Note 24)
Total                                         173.960.204                154.580.451                                Total

                                                            136

Page 146
PT WIJAYA KARYA (PERSERO) Tbk                                                   PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                             AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                          NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                      FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                          For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                   June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                                 And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                                Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                              (In Thousand Rupiah, unless Otherwise Stated)

46. Beban Penjualan                                                                              46. Selling Expenses

Beban     penjualan    merupakan       beban-beban               Selling expenses are expenses relating to the
sehubungan dengan penawaran jasa konstruksi dan                  tendering of construction services and sale of other
penjualan produk diversifikasi lainnya beban untuk               diversified products expenses for the years ended
untuk tahun-tahun yang berakhir pada 30 Juni 2026                June 30, 2026 and 2025 amounted to
dan 2025 masing-masing sebesar Rp5.971.091 dan                   Rp5,971,091 and Rp6,417,310, respectively.
Rp6.417.310.

47. Beban Umum dan Administrasi                                         47. General and Administrative Expenses
                                             2026                      2025
                                              Rp                        Rp

Personalia                                    431.385.115               369.559.007                             Personnel
Fasilitas kantor                               81.118.176                89.024.351                        Office facilities
Administrasi Bank                              27.212.993                20.954.931                   Bank Administration
Penelitian dan pengembangan                    13.123.590                10.082.706            Research and Development
Informatika                                    12.437.235                10.684.627                            Informatics
Depresiasi                                      8.202.482                 9.012.834                         Depreciation
Total                                         573.479.591               509.318.456                                   Total


48. Penghasilan dan Beban Lain-lain                                           48. Other Income and Other Expenses

                                             2026                      2025
                                              Rp                        Rp

Penghasilan Lain-lain                                                                                        Other Income
  Pemulihan Penurunan Nilai                   113.883.927               159.866.143            Recoveries of Impairment
  Penghasilan Bunga Bank                       12.432.519                43.422.879                Bank Interest Income
  Penjualan Aset                                  639.491                 1.815.239          Disposal Form Fixed Assets
  Laba Selisih Kurs                             3.778.642                         --           Gain in Foreign Exchange
  Lain-lain - Neto                             30.864.282               686.260.919                          Others - Net
Total                                         161.598.861               891.365.180                                   Total

Beban Lain-lain                                                                                           Other Expenses
  Kerugian Penurunan Nilai                  (140.427.325)              (133.270.980)                    Impairment Loss
  Rugi Selisih Kurs                                    --                (7.116.095)           Loss in Foreign Exchange
  Lain-lain - Neto                           (13.397.680)              (574.528.122)                         Others - Net
Total                                       (153.825.005)              (714.915.197)                                  Total


49. Beban Keuangan                                                                                    49. Finance Cost

Beban keuangan untuk tahun-tahun yang berakhir                   Financial expense for the years ended June 30,
pada 30 Juni 2026 dan 2025:                                      2026 and 2025 consist of:
                                          2026                       2025
                                           Rp                         Rp

Bunga                                    1.061.146.911               1.119.961.418                     Interest Expense
Beban Amortisasi Diskonto                  252.099.901                 269.567.354       Discounted Amortization Expense
Total                                    1.313.246.812               1.389.528.772                                     Total




                                                           137

Page 147
PT WIJAYA KARYA (PERSERO) Tbk                                                      PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                             NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                         FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                           For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                    June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                                  And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                                 Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                               (In Thousand Rupiah, unless Otherwise Stated)
50. Aset dan Liabilitas Moneter dalam Mata                                          50. Monetary Assets and Liabilities
    Uang Asing                                                                      Denominated In Foreign Currencies

Pada 30 Juni 2026 dan 31 Desember 2025, Grup                       As of June 30, 2026 and December 31, 2025, the
mempunyai aset dan liabilitas moneter dalam mata                   Group has monetary assets and liabilities
uang asing sebagai berikut:                                        denominated in foreign currencies as follow:
                                         2026                                    2025
                            Mata Uang             Setara            Mata Uang             Setara
                              Asing/             Rupiah/              Asing/             Rupiah/
                             Foreign             Rupiah              Foreign             Rupiah
                            Currencies          Equivalent          Currencies          Equivalent
Aset                                                                                                                         Assets
 Kas dan Setara Kas                                                                                      Cash and Cash Equivalents
   EUR                             376.290          7.661.380             383.945           7.584.172                       EUR
   USD                           1.409.901         25.175.198           1.275.984          21.413.555                       USD
   DZD                             372.876             50.051             389.102              50.176                       DZD
   MYR                                  44          1.663.901          21.115.392           1.663.901                       MYR
   JPY                           1.037.930            114.525           1.053.277             112.158                        JPY
   MMK                          69.015.763            589.098          74.118.072             589.098                      MMK
   TWD                              77.689             43.748              82.243              43.748                      TWD
   AED                                  54                264                  58                 264                       AED
   XAF                           1.567.830             47.568           1.556.830              46.524                       CFA
   PHP                             403.244            117.679           7.828.091           2.232.415                       PHP
   SGD                                   --                 --                  9                 123                       SGD
 Piutang Usaha                                                                                           Trade Account Receivables
   DZD                         429.451.760         57.645.310         447.029.205          57.645.310                       DZD
   USD                             350.105          6.251.479             372.511           6.251.479                       USD
   MYR                                   --                 --                  -                   --                      MYR
   TWD                           8.150.488          4.589.703           8.628.348           4.589.703                      TWD
 Piutang Retensi                                                                                             Retention Receivables
   USD                             167.503          2.990.934             178.223           2.990.934                       USD
   MYR                         132.064.482          1.127.263         141.827.984           1.127.263                       MYR
   TWD                           3.347.711          1.885.163           3.543.986           1.885.163                      TWD
                                                  109.953.263                             108.225.986
Aset Moneter Bersih Dalam                                                                                   Net Monetary Assets in
 Mata Uang Asing                         0        109.953.263                             108.225.986         Foreign Currencies


51. Informasi Segmen                                                                             51. Segment Information
1.   Infrastruktur dan Gedung terdiri dari bidang                1. Infrastructure and Building consists of civil
     usaha jasa konstruksi sipil umum yang meliputi                 construction    services    such      as   general
     pembangunan sarana dan prasarana seperti                       construction and infrastructure example roads,
     jalan, jembatan dermaga, bandara, bendungan,                   bridges, harbours, airports, dams, irrigation, and
     irigasi, dan gedung.                                           building.
2.   Energi dan Industrial Plant meliputi bidang                 2. Energy and Industrial Plant consists of energy
     usaha jasa konstruksi bidang energi dan EPC                    and EPC construction, field operations and
     serta jasa operasi dan pemeliharaan pembangkit                 maintenance services of the power plant. In this
     listrik. Pada segmen ini termasuk investasi pada               segment includes investments in the electricity
     sektor kelistrikan yang mayoritas pendanaan                    sector with majority financing and its operation
     dan operasinya dikendalikan oleh Grup.                         controlled by the Group.
3.   Industri terdiri dari usaha beton pracetak seperti          3. Industry consisting of a concrete precast of
     tiang pancang, girder, bantalan rel kereta api,                piles, a girder, rail pad, steel construction,
     konstruksi baja, spare part otomotif, produk                   automotive spare parts, energy conversion
     konversi energi dan industri pertambangan.                     product and mining industry.
4.   Realti dan properti terdiri dari usaha landed               4. Realty and property consists of the business
     housing dan high rise building seperti apartemen               landed housing and high rise such as an
     serta pengelolaan gedung dan kondotel.                         apartment building and building and condotel
                                                                    management.
5.   Hotel terdiri dari barang dan jasa diberikan                5. Hotels consist of goods and services provided to
     kepada tamu hotel atau pengunjung hotel                        hotel guests or hotel restaurant visitors.
     restoran.
                                                             138

Page 148
PT WIJAYA KARYA (PERSERO) Tbk                                                                                                                            PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                                                                                      AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                                                                                   NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                                                                                               FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                                                                                                    For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                                                                                             June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                                                                                                           And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                                                                                                          Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                                                                                                        (In Thousand Rupiah, unless Otherwise Stated)
6.        Pendapatan investasi berasal dari penggunaan                                                                         6. Investment revenue comes from the use of toll
          jalan tol dari aset konsesi.                                                                                            roads from concession assets.
                                                                                                            2026 (Dalam Jutaan/ in Million )
                                     Infrastruktur          Energi dan           Industri/            Realti dan Properti/        Investasi/            Hotel/               Eliminasi/            Konsolidasian/
                                     dan Gedung/         Industrial Plant /      Industry             Realty and Property        Investment             Hotel               Elimination            Consolidated
                                    Infrastructure          Energy and
                                     and Building         Industrial Plant
                                          Rp                    Rp                  Rp                        Rp                     Rp                  Rp                     Rp                       Rp
Penjualan                                   3.674.487                552.826           1.484.501                     81.135               156.020               116.244              (292.108)             5.773.105                                Sales
Beban Pokok Penjualan                     (3.060.495)              (486.500)         (1.392.458)                   (76.925)             (127.199)             (111.415)                292.108           (4.962.884)                   Cost of Goods Sold
Laba Bruto                                    613.992                 66.326               92.043                     4.210                28.821                 4.829                     (0)              810.221                           Gross Profit
Beban Usaha                                 (353.084)-              (27.992)             (81.026)                  (51.355)              (33.348)                 (878)                      --            (547.684)                    General Expenses
Laba Ventura Bersama                          288.001                 16.446                   962                 (1.812)                  (221)                     --               (4.843)               298.532                 Profit Joint Ventures
Laba (Rugi) Pengendalian Bersama            (721.407)                       --                   --                      --                     --                    --                    --             (721.407)       Share in profit of Joint Control
Bagian Rugi dari Entitas Asosiasi            (50.117)                       --                   --               (11.983)                      --               10.236                     --              (51.865)   Share in Gain (Loss) of Associates
Beban Keuangan                              (749.720)                      19             (75.850)               (329.556)              (157.956)                     --                    --           (1.313.063)                        Finance Costs
Pendapatan (Beban) Lain-lain                    6.077                 (3.077)              (9.482)                  17.814                 12.048                (2.687)               (2.104)                18.588            Other Income (Expenses)
                                                                                                                                                --
Laba Sebelum
  Pajak Penghasilan                       (1.081.276)-              136.461               (81.083)               (373.439)              (152.223)                11.499                (6.947)           (1.547.008)             Profit Before Income Tax
Penghasilan (Beban) Pajak                         (9)                     --               (1.164)                   (492)                (4.886)                     --                    --               (6.551)                        Current Tax
Laba Neto                                 (1.081.285)-              136.461               (82.247)-              (373.931)-             (157.109)-               11.499-               (6.947)-          (1.553.559)                         Net Income

Informasi Lainnya                                                                                                                                                                                                                      Other Information
Jumlah Aset Segmen                        47.780.182-             2.235.563-           6.826.437-              11.908.000-             6.698.725-           1.065.642-          (27.568.494)-             48.946.054               Total Segment Assets
                                                    -                      -                    -                        -                      -                    -                      -
Jumlah Liabilitas Segmen                  36.463.896 #            1.748.807
                                                                          0 #          4.308.344
                                                                                               0 #             12.679.094 #            7.018.318
                                                                                                                                               0 #            883.248
                                                                                                                                                                    0           (14.285.809)              48.815.898            Total Segment Liabilities



                                                                                                            2025 (Dalam Jutaan/ in Million )
                                     Infrastruktur          Energi dan            Industri/           Realti dan Properti/        Investasi/            Hotel/               Eliminasi/            Konsolidasian/
                                     dan Gedung/         Industrial Plant /       Industry            Realty and Property        Investment             Hotel               Elimination            Consolidated
                                    Infrastructure          Energy and
                                     and Building         Industrial Plant
                                          Rp                    Rp                   Rp                       Rp                     Rp                  Rp                     Rp                      Rp
Penjualan                                    2.440.506             1.531.539            1.676.911                  165.224                112.779             112.970             (181.745)                5.858.184                               Sales
Beban Pokok Penjualan                      (2.252.480)           (1.369.075)          (1.578.911)                (132.471)              (112.283)           (122.150)               181.745              (5.385.625)                  Cost of Goods Sold
Laba Bruto                                    188.026                162.464                98.000                   32.753                    496               (9.180)                     --              472.559                        Gross Profit
Beban Usaha                                 (274.432)-               (55.851)-            (94.895)-                (58.212)-              (32.345)-                   ---                    ---           (515.735)                   General Expenses
Laba Ventura Bersama                          231.754                 67.386                     5                      78                    574                      --               (935)                298.862                 Profit Joint Ventures
Laba (Rugi) Pengendalian Bersama                    --                      --                  --                       --             (542.311)                      --                   --             (542.311)       Share in profit of Joint Control
Bagian Rugi dari Entitas Asosiasi                   --                      --                  --                   4.417               (96.901)                      --               7.983               (84.501)   Share in Gain (Loss) of Associates
Beban Keuangan                              (825.072)                 (3.198)             (83.194)               (310.394)              (167.671)                      --                   --           (1.389.529)                        Finance Costs
Pendapatan (Beban) Lain-lain                  450.569                   6.860            (287.159)                   (568)                  6.747                      --                   --               176.449            Other Income (Expenses)
Laba Sebelum
  Pajak Penghasilan                         (935.236)                145.314             (372.630)               (335.391)              (193.690)                (9.179)                7.048            (1.693.764)             Profit Before Income Tax
Penghasilan (Beban) Pajak                       (118)                      --              (7.726)                   (363)                (5.906)                     --                    --              (14.113)                        Current Tax
Laba Neto                                   (935.354)                145.314             (380.356)               (335.754)              (199.596)                (9.179)                7.048            (1.707.877)                         Net Income

Informasi Lainnya                                                                                                                                                                                                                     Other Information
Jumlah Aset Segmen                         50.679.313-             3.068.450           8.251.876-              15.295.213-             7.097.589-          1.081.119-           (26.428.933)             59.044.627               Total Segment Assets
                                                     -                     -                    -              11.961.587                       -                   -                      -
Jumlah Liabilitas Segmen                   36.099.207              3.013.164
                                                                           0           4.850.365
                                                                                               0               12.410.970              5.611.021
                                                                                                                                               0             904.879
                                                                                                                                                                   0            (13.925.885)
                                                                                                                                                                                           0             48.963.722            Total Segment Liabilities




Segmen Geografis                                                                                                               Geographical Segment
Data berikut menunjukkan distribusi dari seluruh                                                                               The following data shows the distribution of total
pendapatan, laba bersih dan aset berdasarkan                                                                                   revenue, profit and assets by geography:
geografis:

                                                                                     Dalam Jutaan / in Million
                                                                                  Aset Segmen / Segmen Assets
                                                                                 2026                         2025
                                                                                  Rp                           Rp
 Pulau Jawa                                                                                  31.786.634                                                       40.106.271                                                  Java Island
 Luar Pulau Jawa                                                                             17.159.420                                                       10.040.815                                            Non - Java Island
 Total                                                                                       48.946.054                                                       50.147.086                                                                    Total


                                                                                     Dalam Jutaan / in Million
                                                                                      Pendapatan/ Revenues
                                                                                 2026                         2025
                                                                                  Rp                           Rp
 Pulau Jawa                                                                                    3.057.401                                                         3.306.407                                                Java Island
 Luar Pulau Jawa                                                                               3.222.002                                                         2.551.777                                          Non - Java Island
 Total                                                                                         6.279.403                                                         5.858.184                                                                  Total

                                                                            Dalam Jutaan / in Million
                                                                 Rugi Neto Tahun Berjalan/ Net Loss for The Year
                                                                        2026                         2025
                                                                         Rp                           Rp
  Pulau Jawa                                                                                   177.828                                                     (1.580.389)                                                    Java Island
  Luar Pulau Jawa                                                                          (1.731.387)                                                       (127.485)                                              Non - Java Island
  Total                                                                                    (1.553.559)                                                     (1.707.875)                                                                     Total



                                                                                                                       139

Page 149
PT WIJAYA KARYA (PERSERO) Tbk                                                 PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                           AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                    FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                         For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                  June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                                And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                               Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                             (In Thousand Rupiah, unless Otherwise Stated)
52. Saldo dan Transaksi Pihak Berelasi                           52. Balanced and Transaction of Related Parties
                                                                                                    Transaction

Sifat pihak berelasi                                             Nature of Relationship
1. Pemerintah        Republik   Indonesia   melalui              1. The Government of the Republic of Indonesia
    Kementerian Keuangan adalah pemegang                            represented by Ministry of Finance, is the
    saham utama Perusahaan;                                         majority stockholder of the Company;
2. Seluruh entitas yang dimiliki dan dikendalikan                2. All entities that are owned and controlled by the
    oleh    Kementerian      Keuangan    Pemerintah                 Ministry of Finance of the Republic of Indonesia
    Republik Indonesia serta entitas di mana                        including entities where the Ministry of Finance
    Kementerian Keuangan Pemerintah Republik                        of the Republic of Indonesia has significant
    Indonesia memiliki pengaruh signifikan: Badan                   influence: State-Owned Enterprise (SOE);
    Usaha Milik Negara (BUMN);
3. Pihak berelasi yang pemegang saham utamanya                   3. Related parties which main shareholder is the
    sama dengan Grup;                                               same with Group;
4. Entitas yang merupakan investasi pada asosiasi                4. The entities which part of the Group investment
    dari Grup;                                                      in associates;
5. Entitas yang merupakan ventura bersama dari                   5. The entities which part of Group joint ventures;
    Grup;
6. Manajemen kunci yang meliputi anggota dewan                   6. Key     management     personnel    includes
    Komisaris dan Direksi Perusahaan; dan                           Commissioners and Directors of the Company;
                                                                    and
7. Dana Pensiun Wijaya Karya adalah entitas yang                 7. Wijaya Karya Pension Fund is an entity
   didirikan oleh Perusahaan untuk mengelola                        cofounded by the Company to manage the
   program manfaat imbalan dan iuran pasti                          Company’s defined benefit and contribution
   Perusahaan.                                                      pension plan.




                                                           140

Page 150
PT WIJAYA KARYA (PERSERO) Tbk                                                                    PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                              AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                           NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                                       FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                                           For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                                    June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                                                  And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                                                 Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                                               (In Thousand Rupiah, unless Otherwise Stated)
Ikhtisar pihak-pihak yang berelasi dengan Grup                                      The summary of parties having the special relations
adalah sebagai berikut:                                                             with the Group is as follows:
                    Pihak berelasi/                       Sifat Pihak Berelasi/                                           Transaksi/
                    Related Parties                    The Nature of Relationship                                        Transaction
PT Bank Mandiri (Persero) Tbk                    Entitas yang Berelasi dengan Pemerintah/              Penempatan Rekening, Deposito, Pinjaman Dana,
                                                        Goverment Related Entities                              Tagihan Bruto ke Pemberi Kerja,
                                                                                                Utang Usaha, Pendapatan/ Placement of Accounts, Deposit, Loan,
                                                                                                              Gross Amount Due from Customers,
                                                                                                                  Account Payables, Revenue
PT Bank Rakyat Indonesia (Persero) Tbk           Entitas yang Berelasi dengan Pemerintah/              Penempatan Rekening, Deposito, Pinjaman Dana/
                                                        Goverment Related Entities                           Placement of Accounts, Deposit, Loan
PT Bank Tabungan Negara (Persero) Tbk            Entitas yang Berelasi dengan Pemerintah/        Penempatan Rekening, Deposito, Pinjaman Dana, Utang Usaha/
                                                        Goverment Related Entities                  Placement of Accounts, Deposit, Loan, Account Payable
PT Bank Syariah Indonesia Tbk                    Entitas yang Berelasi dengan Pemerintah/        Penempatan Rekening, Deposito, Pinjaman Dana, Utang Usaha/
                                                        Goverment Related Entities                  Placement of Accounts, Deposit, Loan, Account Payable
PT Bank Negara Indonesia (Persero) Tbk           Entitas yang Berelasi dengan Pemerintah/        Penempatan Rekening, Deposito, Pinjaman Dana, Utang Usaha,
                                                        Goverment Related Entities                    Pendapatan/ Placement of Accounts, Deposit, Loan,
                                                                                                                  Account Payable, Revenue
PT Bank Mandiri Taspen                           Entitas yang Berelasi dengan Pemerintah/               Penempatan Rekening, Deposito, Pendapatan/
                                                        Goverment Related Entities                        Placement of Accounts, Deposit, Revenue
Lembaga Pembiayaan Ekspor Indonesia              Entitas yang Berelasi dengan Pemerintah/      Penempatan Rekening, Pinjaman Dana/ Placement of Accounts, Loan
                                                        Goverment Related Entities
PT Sarana Multi Infrastruktur (Persero)          Entitas yang Berelasi dengan Pemerintah/                               Pinjaman/ Loan
                                                        Goverment Related Entities
PT Indonesia Infrastructure Finance              Entitas yang Berelasi dengan Pemerintah/                               Pinjaman/ Loan
                                                        Goverment Related Entities
Koperasi Karyawan PT Wijaya Karya                        Kepemilikan Sama Terikat/                                   Deposito, Utang Usaha/
                                                            Common Ownership                                        Deposit, Trade Payables
PT Jakarta River City                                        Entitas Asosiasi/                                 Piutang Lain-lain, Utang Lain-Lain/
                                                                 Associate                                      Other Receivables, Other Payable
PT Perusahaan Listrik Negara (Persero)           Entitas yang Berelasi dengan Pemerintah/                   Piutang Usaha, Piutang Retensi, Tagihan
                                                        Goverment Related Entities                Bruto ke Pemberi Kerja, Pekerjaan Dalam Proses Konstruksi,
                                                                                                          Pendapatan/ Accounts Receivables, Retention
                                                                                                       Receivables, Gross Amount Due from Customers,
                                                                                                               Work Under Construction, Revenue
PT Indah Karya (Persero)                         Entitas yang Berelasi dengan Pemerintah/                Piutang Usaha, Tagihan Bruto ke Pemberi Kerja/
                                                        Goverment Related Entities                                     Trade Receivables,
                                                                                                               Gross Amount Due from Customers
PT Pengembangan Pariwisata Indonesia (Persero)   Entitas yang Berelasi dengan Pemerintah/             Piutang Retensi, Pekerjaan Dalam Proses Konstruksi/
                                                        Goverment Related Entities                      Retention Receivables, Work Under Construction
PT Pembangunan Perumahan (Persero) Tbk           Entitas yang Berelasi dengan Pemerintah/        Piutang Usaha, Utang Usaha, Pendapatan / Trade Receivables,
                                                        Goverment Related Entities                                 Account Payable, Revenue
PT Hutama Karya (Persero)                        Entitas yang Berelasi dengan Pemerintah/                            Pendapatan/ Revenue
                                                        Goverment Related Entities
PT Waskita Beton Precast Tbk                     Entitas yang Berelasi dengan Pemerintah/                      Piutang Usaha/ Trade Receivable
                                                        Goverment Related Entities
PT Waskita Karya (Persero) Tbk                   Entitas yang Berelasi dengan Pemerintah/                           Pendapatan/ Revenue
                                                        Goverment Related Entities
PT Patra Jasa                                    Entitas yang Berelasi dengan Pemerintah/                     Piutang Lain-Lain/ Other Receivable
                                                        Goverment Related Entities
KSO WIKA - Hutama Karya                                  Kepemilikan Sama Terikat/                                  Pendapatan / Revenue
                                                            Common Ownership
PT Pertamina (Persero)                           Entitas yang Berelasi dengan Pemerintah/                           Pendapatan/ Revenue
                                                        Goverment Related Entities
PT Hutama Karya Infrastruktur                            Kepemilikan Sama Terikat/                               Piutang Usaha, Pendapatan/
                                                            Common Ownership                                     Trade Receivables, Revenue
PT Nindya Karya (Persero)                        Entitas yang Berelasi dengan Pemerintah/                           Pendapatan/ Revenue
                                                        Goverment Related Entities
PT Adhi Karya (Persero) Tbk                      Entitas yang Berelasi dengan Pemerintah/       Piutang Usaha, Utang Usaha, Pekerjaan Dalam Proses Konstruksi/
                                                        Goverment Related Entities                Trade Receivables, Account Payable, Work Under Construction
KSO CRBC - WIKA - PP                                         Ventura Bersama/                                     Piutang Usaha, Pendapatan/
                                                               Joint Venture                                      Trade Receivables, Revenue
PT Pelabuhan Indonesia III (Persero)             Entitas yang Berelasi dengan Pemerintah/                 Tagihan Bruto ke Pemberi Kerja, Pendapatan/
                                                        Goverment Related Entities                        Gross Amount Due from Customers, Revenue
PT Pelabuhan Indonesia II (Persero)              Entitas yang Berelasi dengan Pemerintah/                       Tagihan Bruto ke Pemberi Kerja,
                                                        Goverment Related Entities                      Pekerjaan Dalam Proses Konstruksi, Pendapatan/
                                                                                                              Gross Amount Due from Customer,
                                                                                                               Work Under Construction, Revenue
PT Jasa Marga (Persero) Tbk                      Entitas yang Berelasi dengan Pemerintah/                    Piutang Retensi/ Retention Receivables
                                                        Goverment Related Entities
PT Kereta Api Indonesia (Persero)                Entitas yang Berelasi dengan Pemerintah/                           Pendapatan/ Revenue
                                                        Goverment Related Entities
PT Bukit Asam Tbk                                Entitas yang Berelasi dengan Pemerintah/             Piutang Usaha, Pekerjaan Dalam Proses Konstruksi,
                                                        Goverment Related Entities                             Pendapatan/ Account Receivable
                                                                                                             Work Under Construction, Pendapatan
PT Angkasa Pura II (Persero)                     Entitas yang Berelasi dengan Pemerintah/                        Piutang Retensi, Pendapatan/
                                                        Goverment Related Entities                             Retention Receivables, Revenue
KSO WIKA - Rudy Jaya                                     Kepemilikan Sama Terikat/                                  Pendapatan/ Revenue
                                                            Common Ownership
PT Citra Marga Lintas Jabar                              Kepemilikan Sama Terikat/                            Piutang Lain-Lain/ Other Receivable
                                                            Common Ownership
PT Pelabuhan Indonesia I (Persero)               Entitas yang Berelasi dengan Pemerintah/              Piutang Usaha, Tagihan Bruto ke Pemberi Kerja/
                                                        Goverment Related Entities                  Account Receivable, Gross Amount Due from Customers
PT Semen Indonesia (Persero) Tbk                 Entitas yang Berelasi dengan Pemerintah/                       Utang Usaha/ Trade Payable
                                                        Goverment Related Entities
PT Pilar Sinergi BUMN Indonesia                              Ventura Bersama/                                        Investasi/ Investment
                                                               Joint Venture
PT Wijaya Karunia Realtindo                              Kepemilikan Sama Terikat/                            Piutang Lain-lain/ Other Receivables
                                                            Common Ownership
                                                                           141

Page 151
PT WIJAYA KARYA (PERSERO) Tbk                                                                    PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                              AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                           NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                                       FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                                            For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                                     June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                                                   And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                                                  Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                                                (In Thousand Rupiah, unless Otherwise Stated)
                     Pihak berelasi/                          Sifat Pihak Berelasi/                                          Transaksi/
                     Related Parties                       The Nature of Relationship                                       Transaction
Lembaga Manajemen Aset Negara                            Kepemilikan Sama Terikat/                             Piutang Lain-lain/ Other Receivables
                                                            Common Ownership
Koperasi Tamansari                                       Kepemilikan Sama Terikat/                             Piutang Lain-lain/ Other Receivables
                                                            Common Ownership
PT High Speed Railway Contractor Consortium                  Ventura Bersama/                       Piutang Usaha, Piutang Retensi, Pekerjaan Dalam Proses
                                                               Joint Venture                                 Konstruksi/ Account Receivable, Retention
                                                                                                               Receivable, Work Under Construction
PT Pembangunan Perumahan Semarang Demak            Entitas yang Berelasi dengan Pemerintah/      Piutang Usaha, Piutang Retensi, Tagihan Bruto ke Pemberi Kerja,
                                                          Goverment Related Entities              Pendapatan/ Account Receivable, Retention Receivable, Gross
                                                                                                               Amount Due from Customer, Revenue
PT Pertamina Patra Niaga                           Entitas yang Berelasi dengan Pemerintah/        Piutang Usaha, Tagihan Bruto ke Pemberi Kerja, Pendapatan/
                                                          Goverment Related Entities                 Account Receivable, Retention Receivable, Gross Amount
                                                                                                                         Due from Customer
PT Kaltim Amonium Nitrat                           Entitas yang Berelasi dengan Pemerintah/             Piutang Usaha, Pekerjaan Dalam Proses Konstruksi/
                                                          Goverment Related Entities                       Account Receivable, Work Under Construction
PT Bio Farma (Persero)                             Entitas yang Berelasi dengan Pemerintah/                Piutang Usaha, Piutang Retensi, Pendapatan/
                                                          Goverment Related Entities                   Account Receivable, Retention Receivable, Revenue
PT Gesits Motor Nusantara                          Entitas yang Berelasi dengan Pemerintah/                      Piutang Usaha/ Account Payable
                                                          Goverment Related Entities
KSO WIKA - PP - KMK - HKI                                  Kepemilikan Sama Terikat/                      Piutang Usaha, Tagihan Bruto ke Pemberi Kerja/
                                                              Common Ownership                        Account Receivable, Gross Amount Due from Customer
PT Pertamina Bina Medika                           Entitas yang Berelasi dengan Pemerintah/              Piutang Usaha, Pendapatan/ Account Receivable ,
                                                          Goverment Related Entities                                        Revenue
PT Pertamina Energi Terminal                       Entitas yang Berelasi dengan Pemerintah/        Piutang Usaha, Tagihan Bruto ke Pemberi Kerja, Pendapatan/
                                                          Goverment Related Entities             Account Receivable, Gross Amount Due from Customer, Revenue
KSO WG - APIK                                              Kepemilikan Sama Terikat/                            Piutang Usaha/ Account Receivable
                                                              Common Ownership
PT Pertamina Geothermal Energy                     Entitas yang Berelasi dengan Pemerintah/        Piutang Retensi, Tagihan Bruto ke Pemberi Kerja, Pendapatan/
                                                          Goverment Related Entities             Retention Receivable, Gross Amount Due from Customer, Revenue
PT Angkasa Pura I (Persero)                        Entitas yang Berelasi dengan Pemerintah/    Tagihan Bruto ke Pemberi Kerja, Pekerjaan Dalam Proses, Pendapatan/
                                                          Goverment Related Entities           Gross Amount Due from Customer, Work Under Construction, Revenue
KSO WIKON - APM                                            Kepemilikan Sama Terikat/                       Tagihan Bruto ke Pemberi Kerja, Pendapatan/
                                                              Common Ownership                              Gross Amount Due from Customer, Revenue
KSO WIKA - KG - Jakon Manggala Pratama                     Kepemilikan Sama Terikat/                       Tagihan Bruto ke Pemberi Kerja, Pendapatan/
                                                              Common Ownership                              Gross Amount Due from Customer, Revenue
KSO WIKA - ADHI                                            Kepemilikan Sama Terikat/                       Tagihan Bruto ke Pemberi Kerja, Pendapatan/
                                                              Common Ownership                              Gross Amount Due from Customer, Revenue
PT Bandara International Batam                     Entitas yang Berelasi dengan Pemerintah/                Tagihan Bruto ke Pemberi Kerja, Pendapatan/
                                                          Goverment Related Entities                        Gross Amount Due from Customer, Revenue
PT Kilang Pertamina International                  Entitas yang Berelasi dengan Pemerintah/           Tagihan Bruto ke Pemberi Kerja, Pekerjaan dalam Proses
                                                          Goverment Related Entities             Konstruksi, Pendapatan/ Gross Amount Due from Customer, Work
                                                                                                                   Under Construction, Revenue
PT Bahana Pembinaan Usaha Indonesia (Persero)      Entitas yang Berelasi dengan Pemerintah/                     Piutang Lain-Lain/ Other Receivable
                                                          Goverment Related Entities
PT WIKA Realty Minor Development                           Kepemilikan Sama Terikat/                           Piutang Lain-Lain/ Other Receivable
                                                              Common Ownership
PT Patra Wijaya Realtindo                                  Kepemilikan Sama Terikat/                           Piutang Lain-Lain/ Other Receivable
                                                              Common Ownership
PT Hotel Indonesia Grup                                    Kepemilikan Sama Terikat/                           Piutang Lain-Lain/ Other Receivable
                                                              Common Ownership
KSO WIKA - Basuki                                          Kepemilikan Sama Terikat/                           Piutang Lain-Lain/ Other Receivable
                                                              Common Ownership
KSO WIKA - DMT - Barata                                    Kepemilikan Sama Terikat/                           Piutang Lain-Lain/ Other Receivable
                                                              Common Ownership
PT Surabaya Industrial Estate Rungkut              Entitas yang Berelasi dengan Pemerintah/                      Utang Usaha/ Account Payable
                                                          Goverment Related Entities
PT Krakatau Baja Konstruksi                        Entitas yang Berelasi dengan Pemerintah/           Utang Usaha, Pendapatan/ Account Payable, Revenue
                                                          Goverment Related Entities
PT Solusi Bangun Beton                             Entitas yang Berelasi dengan Pemerintah/                      Utang Usaha/ Account Payable
                                                          Goverment Related Entities
KSO WIKA - Jaya Konstruksi Manggala Pratama                Kepemilikan Sama Terikat/                  Utang Usaha, Pendapatan/ Account Payable, Revenue
                                                              Common Ownership
PT Pegadaian (Persero)                             Entitas yang Berelasi dengan Pemerintah/                      Utang Lain-Lain/ Other Payable
                                                          Goverment Related Entities
Dana Pensiun PT Wijaya Karya                               Kepemilikan Sama Terikat/                             Utang Lain-Lain/ Other Payable
                                                              Common Ownership
PT Kurnia Rejeki Gemilang                          Entitas yang Berelasi dengan Pemerintah/                      Utang Lain-Lain/ Other Payable
                                                          Goverment Related Entities
PT Aero Wisata                                     Entitas yang Berelasi dengan Pemerintah/                      Utang Lain-Lain/ Other Payable
                                                          Goverment Related Entities
KSO WIKA - PP - Karya Marga Konstruksi - Hutama            Kepemilikan Sama Terikat/                                 Pendapatan/ Revenue
 Karya Infrastruktur                                          Common Ownership
Perum Jasa Tirta II                                Entitas yang Berelasi dengan Pemerintah/                          Pendapatan/ Revenue
                                                          Goverment Related Entities
KSO WIKA - Waskita Karya - Jaya Konstruksi                 Kepemilikan Sama Terikat/                                 Pendapatan/ Revenue
 Manggala Pratama - PP                                        Common Ownership
KSO WIKA - PP - Waskita Karya                              Kepemilikan Sama Terikat/                                 Pendapatan/ Revenue
                                                              Common Ownership
KSO WIKA - PP - Nindya Karya - Adhi Karya                  Kepemilikan Sama Terikat/                                 Pendapatan/ Revenue
                                                              Common Ownership
KSO WIKA - Jaya Obayashi - Jaya Konstruksi - JFE           Kepemilikan Sama Terikat/                                 Pendapatan/ Revenue
 Engineering                                                  Common Ownership
KSO WIKA - PP                                              Kepemilikan Sama Terikat/                                 Pendapatan/ Revenue
                                                              Common Ownership
KSO WIKA - PP - Karya Marga Konstruksi                     Kepemilikan Sama Terikat/                                 Pendapatan/ Revenue
                                                              Common Ownership
KSO WIKA - Aldaberta                                       Kepemilikan Sama Terikat/                                 Pendapatan/ Revenue
                                                              Common Ownership
PT PLN Nusantara Power Construction                Entitas yang Berelasi dengan Pemerintah/                          Pendapatan/ Revenue
                                                          Goverment Related Entities

                                                                             142

Page 152
PT WIJAYA KARYA (PERSERO) Tbk                                                                     PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                               AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                            NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                                        FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                                            For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                                     June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                                                   And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                                                  Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                                                (In Thousand Rupiah, unless Otherwise Stated)
                   Pihak berelasi/                         Sifat Pihak Berelasi/                                   Transaksi/
                  Related Parties                       The Nature of Relationship                                Transaction
PT Pertamina Ep Asset 2                          Entitas yang Berelasi dengan Pemerintah/                     Pendapatan/ Revenue
                                                        Goverment Related Entities
KSO WIKA - Gemilang                                      Kepemilikan Sama Terikat/                            Pendapatan/ Revenue
                                                            Common Ownership
KSO WIKA - Sacna Prima Teknik                            Kepemilikan Sama Terikat/                            Pendapatan/ Revenue
                                                            Common Ownership
KSO WIKA - PMJ                                           Kepemilikan Sama Terikat/                            Pendapatan/ Revenue
                                                            Common Ownership
KSO WIKA - Sino Road And Bridge Group Co.Ltd -           Kepemilikan Sama Terikat/                            Pendapatan/ Revenue
 Adhi Karya                                                 Common Ownership
PT Brantas Abipraya (Persero)                    Entitas yang Berelasi dengan Pemerintah/                     Pendapatan/ Revenue
                                                        Goverment Related Entities
KSO WEGE - Brantas Abipraya                              Kepemilikan Sama Terikat/                            Pendapatan/ Revenue
                                                            Common Ownership
KSO WIKA - BIT                                           Kepemilikan Sama Terikat/                            Pendapatan/ Revenue
                                                            Common Ownership
KSO WIKA - Minarta Dutahutama - Karya Utama              Kepemilikan Sama Terikat/                            Pendapatan/ Revenue
                                                            Common Ownership
KSO WEGE - Abadi Prima Inti Karya                        Kepemilikan Sama Terikat/                            Pendapatan/ Revenue
                                                            Common Ownership



Transaksi-transaksi Pihak Berelasi                                                     Transactions with Related Parties
Dalam kegiatan usahanya, Grup melakukan transaksi                                      In the normal course of business, the Group
tertentu dengan pihak berelasi, yang meliputi antara                                   entered into certain transactions with related
lain:                                                                                  parties, including the following:

                                                                                                                  Persentase terhadap
                                                                                                                       Total Aset
                                                                                                                     yang Terkait/
                                                                                                                  Percentage to Total
                                                                                                                    Related Assets
                                                                    2026                     2025              2026                 2025
                                                                     Rp                       Rp                %                     %
Bank/Banks
Rupiah
  PT Bank Mandiri (Persero) Tbk                                    1.254.971.329            1.628.691.166                2,56              3,25
  PT Bank Rakyat Indonesia (Persero) Tbk                              65.340.186              107.085.286                0,13              0,25
  PT Bank Negara Indonesia (Persero) Tbk                              53.584.045              125.657.193                0,11              0,25
  PT Bank Syariah Indonesia Tbk                                       38.417.013              165.247.649                0,08              0,25
  PT Bank Tabungan Negara (Persero) Tbk                                2.401.768                2.373.159                0,00                 --
  PT Bank Mandiri Taspen                                               1.772.792                  302.357                0,00                 --
  Lembaga Pembiayaan Ekspor Indonesia-
    Indonesia Eximbank                                                     144.070                  182.048              0,00              0,00
Mata Uang Asing/Foreign Currencies
USD
  PT Bank Negara Indonesia (Persero) Tbk                              33.038.663                  526.952                0,07                 --
  PT Bank Mandiri (Persero) Tbk                                       21.594.160               18.676.153                0,04              0,04
  PT Bank Rakyat Indonesia (Persero) Tbk                               1.246.317                1.523.589                0,00              0,00
SGD
  PT Bank Negara Indonesia (Persero) Tbk                                          --                123.275                 --             0,00
EURO
  PT Bank Mandiri (Persero) Tbk                                         2.584.552               2.507.091                0,01              0,01
  PT Bank Negara Indonesia (Persero) Tbk                                   35.945                  36.198                0,00              0,00
JPY
  PT Bank Mandiri (Persero) Tbk                                           99.161                   96.958                0,00              0,00
  PT Bank Rakyat Indonesia (Persero) Tbk                                  15.219                   15.055                0,00              0,00
Subtotal                                                           1.475.245.220            2.053.044.129                3,01              4,05
Deposito Berjangka/Time Deposits
Rupiah
  PT Bank Negara Indonesia (Persero) Tbk                             132.070.000               12.000.000                0,27              0,02
  PT Bank Mandiri (Persero) Tbk                                      129.353.590              230.293.590                0,26              0,46
  PT Bank Syariah Indonesia Tbk                                       52.000.000              116.000.000                0,11              0,23
  Koperasi Karyawan PT Wijaya Karya                                   28.549.510               28.549.510                0,06              0,06
  PT Bank Rakyat Indonesia (Persero) Tbk                              15.000.000               11.000.000                0,03              0,02
  PT Bank Tabungan Negara (Persero) Tbk                                        --             124.608.781                   --             0,25
Mata Uang Asing/Foreign Currencies
USD
  PT Bank Mandiri (Persero) Tbk                                        1.647.859                        --                  --                --
Subtotal                                                             358.620.959              522.451.881                0,73              1,04
Total                                                              1.833.866.179            2.575.496.010                3,74              5,09


                                                                           143

Page 153
PT WIJAYA KARYA (PERSERO) Tbk                                              PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                        AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                     NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                 FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                     For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                              June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                            And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                           Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                         (In Thousand Rupiah, unless Otherwise Stated)
                                                                                           Persentase terhadap
                                                                                                Total Aset
                                                                                              yang Terkait/
                                                                                           Percentage to Total
                                                                                             Related Assets
                                                     2026            2025               2026                 2025
                                                      Rp              Rp                 %                     %
Bank Dibatasi Penggunaannya/ Restricted Bank
Rupiah
  PT Bank Mandiri (Persero) Tbk                        13.075.744     450.121.356              0,03                  0,90
  PT Bank Negara Indonesia (Persero) Tbk                9.449.859               --             0,02                     --
  PT Bank Syariah Indonesia Tbk                         4.184.231               --             0,01                     --
  PT Bank Rakyat Indonesia (Persero) Tbk                  201.595               --                --                    --
Subtotal                                               26.911.428     450.121.356                 0                     1

Piutang Usaha/Trade Accounts Receivables
  PT Indah Karya (Persero)                            102.480.900     102.480.900              0,21                  0,20
  PT Pelabuhan Indonesia (Persero)                    100.750.540      22.538.721              0,21                  0,04
  PT Kaltim Amonium Nitrat                             66.289.077      66.289.077              0,14                  0,13
  PT Angkasa Pura Indonesia (Persero)                  62.673.099               --             0,13                     --
  PT Gesits Motor Nusantara                            45.055.939      45.061.254              0,09                  0,09
  PT Pembangunan Perumahan (Persero) Tbk               39.232.592      21.507.327              0,08                  0,04
  PT Adhi Karya (Persero) Tbk                          30.311.404      27.406.865              0,06                  0,05
  PT Pembangunan Perumahan Semarang Demak              25.680.534     205.834.683              0,05                  0,41
  PT Perum Jasa Tirta                                  24.848.625               --             0,05                     --
  PT Bukit Asam Tbk                                    21.683.525      21.122.601              0,04                  0,04
  KSO WIKA - PMJ                                       21.311.433               --             0,04                     --
  PT Pertamina Patra Niaga                                      --     71.381.921                 --                 0,14
  PT Bio Farma (Persero)                                        --     53.112.723                 --                 0,11
  KSO WIKA - CRBC - PP                                          --     26.476.837                 --                 0,05
  Lain-lain (masing-masing di bawah Rp20.000.000)/
    Others (each below Rp20,000,000)                  277.371.843     253.304.148              0,57                  0,51
  Subtotal                                            817.689.510     916.517.057              1,67                  1,81
  Dikurangi/Less : Cadangan Kerugian Penurunan
    Nilai/Allowance for Impairment Losses            (166.149.461)   (189.214.818)            (0,34)                (0,38)
Total                                                  651.540.049     727.302.239              1,33                  1,43
                                                                                  t

Piutang Retensi/Retention Receivables
  PT Angkasa Pura II (Persero)                        120.199.770         297.787              0,25                     --
  PT Perusahaan Listrik Negara (Persero)               79.963.620      99.956.407              0,16                  0,20
  PT Pembangunan Perumahan Semarang Demak              53.583.031         131.278              0,11                     --
  PT Jasamarga Toll Road Maintenance                   35.809.740      35.809.740              0,07                  0,07
  PT Bio Farma (Persero)                               31.243.924      26.127.721              0,06                  0,05
  PT Pengembangan Pariwisata Indonesia (Persero)                --     33.013.508                 --                 0,07
  Lain-lain (masing-masing di bawah
    Rp20.000.000)/Others (each below Rp20,000,000)     78.322.327      99.817.333              0,16                  0,20
  Subtotal                                            399.122.412     295.153.774              0,81                  0,59
  Dikurangi/Less : Cadangan Kerugian Penurunan
    Nilai/Allowance for Impairment Losses             (24.465.287)    (30.087.132)            (0,05)                (0,06)
Total                                                 374.657.125     265.066.642               0,76                  0,53

Tagihan Bruto ke Pemberi Kerja/Gross Amount
  Due from Customers
  PT Pertamina Energi Terminal                        281.940.647      77.381.281              0,58                  0,15
  PT Pembangunan Perumahan Semarang Demak             108.849.283               --             0,22                     --
  PT Pelabuhan Indonesia (Persero)                     92.958.384      24.077.372              0,19                  0,05
  PT Indah Karya (Persero)                             80.122.877      80.122.877              0,16                  0,16
  PT Pertamina Patra Niaga                             51.219.167      54.612.226              0,10                  0,11
  PT Perusahaan Listrik Negara (Persero)               28.120.954      28.120.954              0,06                  0,06
  PT Pertamina Geothermal Energy                       27.847.639      29.942.813              0,06                  0,06
  PT Pengembangan Pariwisata Indonesia (Persero)       27.552.112               --             0,06                     --
  KSO WIKA - KG - Jakon Manggala Pratama               24.787.537      24.188.366              0,05                  0,05
  KSO WIKA - Adhi Karya                                21.693.403      21.557.297              0,04                  0,04
  PT Bank Mandiri (Persero) Tbk                        15.036.298      29.203.301              0,03                  0,06
  KSO WIKON - APM                                       6.526.953      29.151.560              0,01                  0,06
  PT Angkasa Pura I (Persero)                               1.505     247.629.146                 --                 0,49
  Lain-lain/Others (masing-masing di bawah
    Rp20.000.000) /each below Rp20,000,000 )           91.376.514     136.683.817              0,19                  0,27
  Subtotal                                            858.033.272     782.671.010              0,19                  0,76
  Dikurangi/Less: Cadangan Kerugian Penurunan
    Nilai/Allowance for Impairment Losses            (102.691.737)    (98.132.205)            (0,21)                (0,20)
Total                                                  755.341.535    684.538.805             (0,02)                  0,56
                                                            144

Page 154
PT WIJAYA KARYA (PERSERO) Tbk                                                PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                          AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                       NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                   FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                       For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                              And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                             Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                           (In Thousand Rupiah, unless Otherwise Stated)
                                                                                             Persentase terhadap
                                                                                                  Total Aset
                                                                                                yang Terkait/
                                                                                             Percentage to Total
                                                                                               Related Assets
                                                      2026              2025              2026                 2025
                                                       Rp                Rp                %                     %
Pekerjaan dalam Proses/
  Working in Progress
  PT Pelabuhan Indonesia II (Persero)                1.268.915.365     1.268.915.365             2,59                  2,53
  PT Perusahaan Listrik Negara (Persero)               402.991.405       402.991.405             0,82                  0,80
  PT Angkasa Pura I (Persero)                          311.898.440       311.898.440             0,64                  0,62
  PT Kaltim Amonium Nitrat                             203.244.615       203.244.615             0,42                  0,41
  PT Bukit Asam Tbk                                    202.349.250       202.349.250             0,41                  0,40
  PT Kilang Pertamina International                     93.762.530        93.762.530             0,19                  0,19
  KSO High Speed Railway Contractor Consortium          69.753.257        62.598.515             0,14                  0,12
  PT Adhi Karya (Persero) Tbk                           59.605.270        59.323.641             0,12                  0,12
  PT Pengembangan Pariwisata Indonesia (Persero)        26.020.241        66.097.936             0,05                  0,13
  Lain-lain/Others (masing-masing di bawah
    Rp50.000.000) /each below Rp50,000,000)            333.795.826       326.543.543             0,68                  0,65
  Subtotal                                           2.972.336.199     2.997.725.240             6,06                  5,97
  Dikurangi/Less: Cadangan Kerugian Penurunan
    Nilai/Allowance for Impairment Losses           (2.438.776.498)   (2.499.399.826)           (4,98)                (4,98)
Total                                                   533.559.701       498.325.414           12,12                   5,97

Piutang Lain-lain/ Other Receivables
  PT Wijaya Karunia Realtindo                        1.137.029.806     1.137.032.096             2,32                  2,27
  PT Bahana Pembinaan Usaha Indonesia (Persero)        240.033.270       240.435.883             0,49                  0,48
  PT WIKA Realty Minor Development                     125.013.819       118.826.050             0,26                  0,24
  PT Jakarta River City                                 38.727.044        38.727.044             0,08                  0,08
  Tamansari Jineng                                      16.653.986        17.260.628             0,03                  0,03
  PT Hotel Indonesia Grup                                9.735.156         9.388.946             0,02                  0,02
  KSO High Speed Railway Contractor Consortium           9.469.445         4.958.209             0,02                  0,01
  Lembaga Manajemen Aset Negara                          8.440.649         8.440.649             0,02                  0,02
  Koperasi Karyawan PT Wijaya Karya                      7.647.028         1.899.207             0,02                     --
  PT Patra Jasa                                          7.600.000         7.600.000             0,02                  0,02
  KSO WIKA - Basuki                                      5.662.061         8.181.531             0,01                  0,02
  PT Patra Wijaya Realtindo                              3.736.610        67.486.610             0,01                  0,13
  Lain-lain (masing-masing di bawah Rp5.000.000)/
    Others (each below Rp5,000,000)                     70.931.261        62.832.091             0,14                  0,13
  Subtotal                                           1.680.680.136     1.723.068.944             3,44                  3,45
  Dikurangi/Less : Cadangan Kerugian Penurunan
    Nilai/Allowance for Impairment Losses           (1.468.758.199)   (1.471.349.987)           (3,00)                (2,93)
Total                                                   211.921.937       251.718.957             0,44                  0,52
Investasi pada Entitas Asosiasi/
  Investment in Associates                           2.495.673.835     2.708.297.133             5,10                  5,40

Investasi pada Ventura Bersama/
  Investment in Joint Venture                        7.194.399.632     8.076.686.612            14,70                 16,11




                                                             145

Page 155
PT WIJAYA KARYA (PERSERO) Tbk                                              PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                        AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                     NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                 FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                     For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                              June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                            And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                           Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                         (In Thousand Rupiah, unless Otherwise Stated)
                                                                                           Persentase terhadap
                                                                                              Total Liabilitas
                                                                                         yang Terkait/Percentage
                                                                                             to Total Related
                                                                                                Liabilities
                                                    2026             2025               2026                   2025
                                                     Rp               Rp                 %                      %
Pinjaman Jangka Pendek/Short Term Loan
Entitas Anak/Subsidiaries                             66.145.047       83.055.267               0,14                   0,17
Total                                                 66.145.047       83.055.267               0,14                   0,17
Pinjaman Jangka Panjang/Long Term Loan
Perusahaan/the Company                            14.146.549.009    14.859.566.500             28,98                  30,66
Entitas Anak/Subsidiaries                          3.598.510.200     3.640.540.004              7,37                   7,51
Total                                             17.745.059.209    18.500.106.504              7,37                   7,51

Utang Usaha/Trade Payable
Utang Pemasok dan Utang Subkontraktor/
  Supplier Payables and Subcontractor Payables
  PT Semen Indonesia (Persero) Tbk                    60.728.460       73.141.609               0,12                   0,15
  PT Pembangunan Perumahan (Persero) Tbk              37.592.436       37.592.436               0,08                   0,08
  PT Adhi Karya (Persero) Tbk                         25.402.392       27.688.119               0,05                   0,06
  PT Surabaya Industrial Estate Rungkut               21.302.137       21.352.137               0,04                   0,04
  Lain-lain/Others (Masing-masing di bawah
    Rp20.000.000/Each below Rp20,000,000 )           192.810.413      194.763.353               0,39                   0,40
  Subtotal                                           337.835.838      354.537.654               0,68                   0,73

Utang Usaha/Account Payables-
  Supply Chain Financing
  PT Bank Mandiri (Persero) Tbk                      239.295.227      162.315.236               0,49                   0,33
  PT Bank Syariah Indonesia Tbk                      104.779.195       44.445.191               0,21                   0,09
  PT Bank Negara Indonesia (Persero) Tbk               5.599.201       39.275.733               0,01                   0,08
  PT Bank Rakyat Indonesia (Persero) Tbk                       --      34.946.295                  --                  0,07
  Subtotal                                           349.673.624      280.982.455               0,71                   0,57
Total                                                687.509.462      635.520.109               1,41                   1,31

Utang Lain-lain/Other Payable
  PT Pegadaian (Persero)                             707.465.982      707.465.982               1,45                   1,46
  PT Jakarta River City                               24.289.620       24.289.620               0,05                   0,05
  PT Kurnia Rejeki Gemilang                           17.869.102       15.689.064               0,04                   0,03
  Dana Pensiun PT Wijaya Karya                        15.689.064       16.208.710               0,03                   0,03
  Lain-lain/Others (Masing-masing di bawah
    Rp10.000.000/Each below Rp10,000,000 )             33.274.475       31.065.342               0,07                   0,06
  Subtotal                                            798.588.244      794.718.718               1,64                   1,63
  Dikurangi Bagian Lancar/Less Current Portion      (780.719.142)    (773.119.503)             (1,60)                 (1,60)
Total                                                  17.869.102       21.599.215               0,04                   0,03




                                                           146

Page 156
PT WIJAYA KARYA (PERSERO) Tbk                                                               PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                         AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                      NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                                  FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                                       For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                                June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                                              And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                                             Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                                           (In Thousand Rupiah, unless Otherwise Stated)
                                                                                                                Persentase terhadap
                                                                                                                  Total Pendapatan
                                                                                                              yang Terkait/ Percentage
                                                                                                                   to Total Related
                                                                                                                      Revenues
                                                                         2026               2025             2026                   2025
                                                                          Rp                 Rp               %                      %
Pendapatan/Revenue
  PT Pertamina Energy Terminal                                            495.084.069          5.036.115             7,88                   0,09
  PT Pertamina Patra Niaga                                                161.693.808          3.864.600             2,57                   0,07
  PT Angkasa Pura I (Persero)                                             110.404.353        455.813.934             1,76                   7,78
  PT Perusahaan Listrik Negara (Persero)                                  101.358.768          3.360.100             1,61                   0,06
  PT Pelabuhan Indonesia III (Persero)                                     90.766.252          8.551.705             1,45                   0,15
  PT Pelabuhan Indonesia II (Persero)                                      88.482.756          9.024.180             1,41                   0,15
  Perum Jasa Tirta II                                                      80.364.827                  --            1,28                      --
  PT Pertamina Geothermal Energy                                           58.717.411          4.591.635             0,94                   0,08
  KSO WIKA - Nindya Karya                                                  52.126.755                  --            0,83                      --
  JV Kumagai Gumi Co. Ltd - WIKA - Jaya Konstruksi Manggala Pratama        41.522.591         14.853.251             0,66                   0,25
  PT Bank Mandiri (Persero) Tbk                                            33.216.943         81.580.021             0,53                   1,39
  KSO WIKA - PMJ                                                           30.004.419             52.338             0,48                      --
  PT Pengembangan Pariwisata Indonesia (Persero)                           28.718.551                  --            0,46                      --
  PT Pembangunan Perumahan (Persero) Tbk                                   28.473.740          7.835.320             0,45                   0,13
  PT Nindya Karya (Persero)                                                28.440.144         10.831.158             0,45                   0,18
  PT Hutama Karya Infrastruktur                                            24.199.723         21.875.348             0,39                   0,37
  KSO WIKA - Waskita Karya - Jaya Konstruksi Manggala Pratama - PP         24.166.257              6.900             0,38                      --
  PT Adhi Karya (Persero) Tbk                                              23.058.496        547.924.326             0,37                   9,35
  PT Angkasa Pura Indonesia (Persero)                                      19.512.482        140.571.069             0,31                   2,40
  KSO WIKA - Adhi Karya                                                    19.164.748            636.552             0,31                   0,01
  PT Bank Mandiri Taspen                                                   18.053.325         80.045.286             0,29                   1,37
  KSO WIKA - China Road & Bridge Corporation - PP                          13.377.651         35.982.178             0,21                   0,61
  KSO WIKA - PP - Nindya Karya - Adhi Karya                                10.702.162          2.464.685             0,17                   0,04
  PT Rekayasa Industri                                                     10.543.610                  --            0,17                      --
  PT Brantas Abipraya (Persero)                                            10.179.420         41.716.174             0,16                   0,71
  PT Bank Rakyat Indonesia (Persero) Tbk                                    9.180.540         58.159.134             0,15                   0,99
  PT Kereta Api Indonesia (Persero)                                         8.143.690         15.126.967             0,13                   0,26
  PT Hutama Karya (Persero)                                                 6.018.730         23.185.559             0,10                   0,40
  KSO Kumagai Gumi Co. Ltd - WIKA                                           4.898.872         11.852.106             0,08                   0,20
  KSO WIKA - PP - Karya Marga Konstruksi - Hutama Karya Infrastruktur       4.582.586             48.946             0,07                      --
  PT Jasa Marga (Persero)                                                   3.945.644         19.917.924             0,06                   0,34
  PT Kereta Api Properti Manajemen                                          2.071.301         17.066.150             0,03                   0,29
  PT Bio Farma (Persero)                                                    1.938.333         47.412.701             0,03                   0,81
  KSO WIKA - PP - Waskita Karya                                             1.352.000          2.589.960             0,02                   0,04
  KSO WIKA - Jaya Obayashi - Jaya Konstruksi - JFE Engineering                669.122         17.746.935             0,01                   0,30
  PT ASDP Indonesia Ferry (Persero)                                           827.828        104.805.835             0,01                   1,79
  PT Bank Negara Indonesia (Persero) Tbk                                      528.225         75.986.358             0,01                   1,30
  PT Jasa Peralatan Pelabuhan Indonesia                                       401.624         18.078.690             0,01                   0,31
  KSO CAMCE - Adhi Karya - WIKA                                               248.735         36.965.135                --                  0,63
  PT Dayamitra Telekomunikasi                                                  35.226         34.527.808                --                  0,59
  PT Gesits Motor Nusantara                                                    17.213         32.485.914                --                  0,55
  PT Bandara International Batam                                                    --        88.170.187                --                  1,51
  PT Bukit Asam Tbk                                                                 --        37.452.907                --                  0,64
  High Speed Railway Contractor Consortium - Team WIKA                              --        28.080.623                --                  0,48
  PT Karya Logistik Nusantara                                                       --        15.916.908                --                  0,27
  PT Kilang Pertamina International                                                 --        13.876.258                --                  0,24
  Lain-lain (masing-masing di bawah Rp10.000.000)
    Others (Each Below Rp10,000,000)                                        93.903.682         50.494.941            1,50                   0,86
Total                                                                    1.741.096.612      2.226.564.821           27,73                  37,99




                                                                        147

Page 157
PT WIJAYA KARYA (PERSERO) Tbk                                                                                                                PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                                                                          AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                                                                       NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                                                                                   FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                                                                                      For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                                                                               June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                                                                                             And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                                                                                            Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                                                                                          (In Thousand Rupiah, unless Otherwise Stated)
Total kompensasi yang diterima oleh direksi dan                                                                 Total compensation of the director and board of
dewan komisaris adalah sebagai berikut:                                                                         commissioners are as follows:

                                                                                      2026                                    2025
                                                                                       Rp                                      Rp

Imbalan Kerja Jangka Pendek                                                               12.920.584                             13.517.331                                Short Term Employee Benefits

53. Perikatan dan Kontinjensi Signifikan                                                                        53. Significant Commitments and Contingencies
a. Perikatan Signifikan                                                                                          a. Significant Commitments
Grup melakukan perikatan kontrak konstruksi dengan                                                              The Group has entered into a construction contract
berbagai pihak. Kontrak signifikan sampai tahun                                                                 with other parties. Significant contracts until year
2026 adalah sebagai berikut:                                                                                    2026 are as follows:
                                Pemberi Kerja/                                    Nilai Kontrak /                                       Nama Proyek /                              Masa Pelaksanaan / Period of Time
                                   Owner                                          Contract Value                                       Name of Projects                            Mulai / Started    Selesai / Ended

PT Kereta Cepat Indonesia-China                                                      16.638.818.016   Proyek HSR                                                                    15/12/2016          30/09/2024
PT Wijaya Karya Serang Panimbang                                                      5.157.486.198   Pembangunan Konstruksi Main Road Jalan Tol Serang Panimbang                   04/12/2017          31/12/2024
PT Citra Marga Nusaphala Persada Tbk                                                  5.022.599.598   Tol Harbour Road II Section 1 : Ancol - Pluit                                 01/12/2019          08/05/2025
PT Bukit Asam                                                                         4.493.640.000   Jasa Kontraktor EPC Pengembangan CHF, Rail Loop serta TLS 6 dan TLS 7
                                                                                                                                                                                    04/11/2024          27/06/2026
PUPR Satker Pelaksanaan Pembangunan IKN 2                                             3.748.845.064   Tol IKN Seksi 1B                                                              01/11/2024          25/03/2026
PT Jasa Marga Japek Selatan                                                           3.602.624.584   Proyek Tol Japek Selatan 2A                                                   28/08/2023          26/02/2025
PT Pertamina Energy Terminal                                                          3.574.783.104   Pembangunan Terminal LPG Refrigerated Jawa Timur Tahap 2 Lingkup Terminal
                                                                                                                                                                                    08/03/2023          07/09/2025
                                                                                                      Sisi Darat & Jetty
PT Hutama Karya (Persero)                                                             3.518.833.103   Pelaksanaan Pembangunan Jalan Tol Ruas Pekan Baru Padang, Seksi
                                                                                                                                                                                    03/05/2019          05/05/2024
                                                                                                      Bangkinang - Pangkalan
PT Pertamina Energy Terminal                                                          2.792.643.666   Pembangunan Terminal LPG Refrigerated Jawa Timur Tahap 2 Lingkup Terminal
                                                                                                                                                                                    08/03/2023          07/09/2025
                                                                                                      Sisi Darat & Jetty
PT Perusahaan Listrik Negara (Persero)                                                2.087.842.704   PLTU Palu                                                                     16/12/2019          31/03/2025
Indonesia Huali Industry Park                                                         2.000.000.000   Port Malili                                                                   09/04/2026          30/12/2027
Bandara International Batam                                                           1.964.864.865   Bandara Hang Nadim                                                            21/11/2022          21/11/2025
Otorita Ibu Kota Nusantara                                                            1.962.955.000   Pekerjaan Pembangunan Bangunan Gedung dan Kawasan Lembaga DPR II di Ibu
                                                                                                                                                                                    04/12/2025          23/12/2027
                                                                                                      Kota Nusantara
Otorita Ibu Kota Nusantara                                                            1.910.594.399   Pembangunan Jalan Kawasan Kompleks Yudikatif                                  31/10/2025          31/12/2027
Rumah Susun Pasukan Pengamanan Presiden (Paspampres)                                  1.808.836.941   Rumah Susun Pasukan Pengamanan Presiden (Paspampres)                          26/08/2023          04/11/2024
Otorita Ibu Kota Nusantara                                                            1.701.238.000   Pekerjaan Pembangunan Bangunan Gedung dan Kawasan Lembaga MPR dan
                                                                                                                                                                                    04/12/2025          23/12/2027
                                                                                                      Bangunan Pendukung di Ibu Kota Nusantara
PT Jasa Marga Japek Selatan                                                           1.621.180.946   Proyek Tol Japek Selatan 2A                                                   28/08/2023          26/02/2025
PT Bank Mandiri (Persero) Tbk                                                         1.463.963.964   Pembangunan Gedung Mandiri Financial Center Pantai Indah Kapuk (PIK) 2
                                                                                                                                                                                    14/04/2025          02/02/2027
Jasa Marga Akses Patimban                                                             1.439.359.422   Pekerjaan Jasa Kontruksi Pembangunan Jalan Tol Akses Patimban Paket IISta.
                                                                                                                                                                                    05/01/2026          30/04/2027
                                                                                                      14+110
Kementerian Pekerjaan Umum Dan Perumahan Rakyat Republik Indonesia                    1.405.465.315   IKN Kantor Presiden                                                           11/02/2022          17/10/2025
Kementerian Kesehatan Republik Indonesia                                              1.373.607.000   RS UPT Vertical Surabaya                                                      27/10/2022          13/08/2025
Kementerian PUPR Dirjen Bina Marga Balai Besar Pelaksanaan Jalan Nasional             1.232.920.714   Proyek Toll Road Development Semarang-Demak 1B
                                                                                                                                                                                    27/02/2023          26/02/2026
Jawa Tengah - Di Yogyakarta
Kementerian Pekerjaan Umum Dan Perumahan Rakyat                                       1.207.763.063   IKN Istana Negara                                                             11/02/2022          17/10/2025
Satuan Kerja Pelaksanaan Jalan Bebas Hambatan Provinsi Jawa Barat (Pupr)              1.181.546.865   Proyek Tol Patimban 4
                                                                                                                                                                                    28/07/2023          27/06/2025
Kementerian Pekerjaan Umum Direktorat Jenderal Prasarana Strategis Satuan Kerja       1.168.608.000   Pembangunan Sekolah Rakyat Provinsi Jawa Tengah 1
                                                                                                                                                                                    28/11/2025          25/07/2026
Pelaksanaan Prasaranan Strategis Jawa Tengah
UPST Dinas Lingkungan Hidup Pemprov Dki Jakarta                                       1.157.256.735   Proyek RDF Plant Jakarta (Rancang dan Bangun)                                 26/03/2023          31/12/2024
Kementerian Pekerjaan Umum Dan Perumahaman Rakyat Bendahara                           1.079.741.983   IKN 3B 2                                                                      21/12/2023          12/06/2025
Yayasan Kartika Eka Paksi                                                             1.039.376.000   Gedung Kampus Unjani                                                          22/12/2020          21/06/2025
PT Jasa Marga Probolinggo Banyuwangi                                                    996.821.538   Proyek Tol Probolinggo - Banyuwangi Paket 3                                   31/12/2022          31/12/2024
PT WIKA Tirta Jaya Jatiluhur                                                            995.728.284   Proyek SPAM Jatiluhur                                                         26/02/2021          30/09/2024
Kementerian Pekerjaan Umum Dan Perumahaman Rakyat Bendahara                             945.590.370   Lingkar Sepaku 4                                                              02/10/2024          24/05/2026
Dirjen Bina Marga Kementrian Pekerjaan Umum Dan Perumahan Rakyat                        937.847.581   Proyek Tol Serang - Panimbang Seksi-3                                         08/08/2022          06/08/2024
RSUP dr. Sardjito                                                                       917.969.584   Konstruksi Fisik Pembangunan Gedung Central Medical Unit (CMU) - Sardjito
                                                                                                                                                                                    04/12/2025          03/12/2027
Kementerian Kesehatan Republik Indonesia                                                862.600.000   Pembangunan Gedung Rspon Prof. Dr. Dr. Mahar Mardjono Jakarta Sebagai Rs
                                                                                                                                                                                    15/12/2023          31/12/2024
                                                                                                      Pendidikan Menjadi Institut Neurosains Nasional (Inn)
Kementerian Pekerjaan Umum Direktorat Jenderal Prasarana Strategis Satuan Kerja         782.299.600   Pembangunan Sekolah Rakyat Provinsi Aceh 1
                                                                                                                                                                                    28/11/2025          25/07/2026
Pelaksanaan Prasaranan Strategis Aceh
Direktorat Jenderal Sumber Daya Air SNVT Pembangunan Bendungan Balai Besar              777.403.726   Bendungan Tiga Dihaji Lanjutan
                                                                                                                                                                                    11/11/2024          31/12/2026
Wilayah Sungai Sumatera VIII
Kementerian Pekerjaan Umum Dan Perumahan Rakyat Republik Indonesia                      773.513.412   Jalan Tol IKN Segmen KKT Kariangau - Sp. Tempadung                            29/08/2022          22/06/2024
Kementerian Pekerjaan Umum Direktorat Jenderal Prasarana Strategis                      769.158.313   Penanganan Keadaan Darurat Pasca Bencana Aceh 1                               29/12/2025          26/06/2026
Kementerian Pekerjaan Umum Direktorat Jenderal Prasarana Strategis Satuan Kerja         728.437.500   Pembangunan Sekolah Rakyat Provinsi Kalimantan Barat
                                                                                                                                                                                    04/12/2025          31/07/2026
Pelaksanaan Prasaranan Strategis Kalimantan Barat
Kementerian PUPR Dirjen SDA BBWS Pompengan Jeneberang SNVT                              726.593.248   Bendungan Jenelata
                                                                                                                                                                                    29/06/2022          17/06/2028
Pembangunan Bendungan Bbws Pompengan Jeneberang
PPK Bendungan I, SNVT Pembangunan Bendungan BBWS Citarum, Balai Besar                   724.750.991   Proyek Pembangunan Bendungan Cijurey Paket III
Sungai Wilayah Citarum, Direktorat Jenderal Sumber Daya Air, Kementrian                                                                                                             31/08/2023          03/10/2028
Pekerjaan Umum
Direktorat Jendral Perhubungan Laut, Kementerian Perhubungan Republik Indonesia         713.427.224   Proyek Pelabuhan Patimban Paket 6
                                                                                                                                                                                    04/01/2023          23/08/2025
PT Bio Farma                                                                            684.216.000   Pekerjaan Konstruksi Pembangunan Gedung Bio Farma Fasilitas Pengembangan
                                                                                                                                                                                    28/01/2022          31/10/2024
                                                                                                      Produk Skala Pilot (Gedung No. 34)
PPK Bendungan III, SNVT Pembangunan Bendungan BBWS Jeneberang -                         675.615.432   Bendungan Pamukkulu
                                                                                                                                                                                    17/11/2017          21/12/2024
Pompengan Direktorat Jendral Sumber Daya Air Kementerian PUPR
PT Dua Samudera Perkasa                                                                 670.000.000   Bangkirai Intermediate Stock Pile                                             28/09/2022          21/01/2024
Kemen PUPR Dirjen SDA Balai Besar Wil.S.Bengawan Solo SNVT                              657.678.773   Proyek Pembangunan Bendungan Karangnongko di Kabupaten Bojonegoro Paket
                                                                                                                                                                                    18/09/2023          18/01/2027
Pemb.Bendungan Bengawan Solo                                                                          1
Kementerian Pekerjaan Umum Dan Perumahan Rakyat Republik Indonesia                      651.901.890   Pembangunan Bangunan Gedung dan Kawasan Basilika dan Gereja                   20/12/2024          03/01/2026
Paket Pekerjaan Konstruksi Terintegrasi Rancang Dan Bangun : Pembangunan                640.030.151   Paket Pekerjaan Konstruksi Terintegrasi Rancang dan Bangun : Pembangunan
Bangunan Gedung Wing 1 Dan Kawasan Kantor Kementrian PUPR                                             Bangunan Gedung Wing 1 dan Kawasan Kantor Kementrian PUPR                     28/12/2023          21/01/2025

Satker Pelaksanaan Jalan Nasional Wilayah1 Provinsi Jambi                               621.556.536   Proyek Tol Bayung Lencir - Tempino Seksi 3                                    17/05/2023          30/09/2024
Satuan Kerja Pelaksanaan Jalan Bebas Hambatan Provinsi Jawa Barat (PUPR)                620.312.104   Proyek Tol Patimban 4
                                                                                                                                                                                    28/07/2023          27/06/2025
Direktorat Jenderal Sumber Daya Air SNVT Pembangunan Bendungan Balai Besar              593.813.605   Proyek Bendungan Komering II / Tiga Dihaji 4
                                                                                                                                                                                    16/10/2018          31/12/2024
Wilayah Sungai Sumatera VIII
PT Pertamina Patra Niaga                                                                577.400.000   Revitalisasi (Pembangunan Kembali) Dermaga Gospier di Integrated Terminal
                                                                                                                                                                                    06/08/2024          28/05/2027
                                                                                                      Surabaya
PPK Air Minum Dan Sanitasi, Satker Pelaksanaan Prasana Permukiman Wilayah               573.153.861   Proyek Jakarta Sewerage System Package 1
                                                                                                                                                                                    18/04/2023          19/04/2029
Jakarta Metropolitan
PT Kaltim Prima Coal                                                                    550.000.000   Rediversion MWRD                                                              01/06/2024          31/12/2025

                                                                                                          148

Page 158
PT WIJAYA KARYA (PERSERO) Tbk                                                                                                                    PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                                                                              AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                                                                           NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                                                                                       FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                                                                                          For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                                                                                   June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                                                                                                 And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                                                                                                Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                                                                                              (In Thousand Rupiah, unless Otherwise Stated)
                                Pemberi Kerja/                                       Nilai Kontrak /                                     Nama Proyek /                                    Masa Pelaksanaan / Period of Time
                                   Owner                                             Contract Value                                     Name of Projects                                  Mulai / Started    Selesai / Ended
PPK Sanitasi I, Satuan Kerja Pelaksanaan Prasarana Permukiman Wilayah Jakarta                546.607.516   Proyek JSS Package 3
Metropolitan, Balai Prasarana Permukiman Wilayah Jakarta Metropolitan, Directorate
                                                                                                                                                                                             13/07/2023         12/10/2027
General Of Human Settlements, Ministry Of Public Works And Housing

PT Graha Blessing Family                                                                     546.381.127   Tamansari Metropolitan Manado III                                                 31/08/2018            2033
Kementerian Pekerjaan Umum Dan Perumahan Rakyat Republik Indonesia                           536.762.700   Renovasi Venue PON XXI Aceh                                                       18/12/2023         13/10/2024
PT Angkasa Pura II (Persero)                                                                 534.971.590   Lanjutan Pekerjaan Aksesbilitas Bandara Soeta                                     31/12/2018         05/12/2024
Kementerian Pekerjaan Umum Dan Perumahaman Rakyat Bendahara                                  528.111.639   Sumbu Timur Lanjutan                                                              20/02/2024         31/12/2024
Kementerian Pekerjaan Umum Dan Perumahan Rakyat​                                             526.528.862   Proyek Bendungan Jragung Paket II
                                                                                                                                                                                             06/11/2020         31/12/2024
SNVT Pembangunan Bendungan BBWS Pemali Juana​
Direktorat Jenderal Sumber Daya Air Snvt Pembangunan Bendungan Balai Besar                   520.959.709   Proyek Bendungan Lau Simeme Paket I (MYC)-JO
                                                                                                                                                                                             04/01/2018         31/12/2024
Wilayah Sungai Sumatera II
Ditjen Bina Marga, Kementerian PUPR                                                          520.606.442   Sumbu Timur                                                                       20/12/2022         19/03/2024
Kementerian Pekerjaan Umum Dan Perumahan Rakyat Republik Indonesia                           511.317.943   Pembangunan Infrastruktur Pengendalian Banjir pada KSPP Kabupaten Merauke
                                                                                                                                                                                             24/11/2025         24/07/2026
                                                                                                           (Paket 2)
PT Dua Samudera Perkasa                                                                      510.000.000   CHS Tanah Grogot                                                                  18/10/2023         08/08/2025
PPK Kegiatan Bendungan - II, SNVT Pembangunan Bendungan BBWS Nusa                            508.670.248   Pembangunan Bendungan Manikin di Kabupaten Kupang (Paket-1)
                                                                                                                                                                                             28/12/2018         24/12/2024
Tenggara II
PPK Irigasi dan Rawa VI SNVT PJPA Cimanuk Cisanggarung ​                                     498.064.640   Proyek Irigasi Rentang Package LSS-07
                                                                                                                                                                                             01/02/2023         10/11/2025
Balai Besar Wilayah Sungai Cimanuk Cisanggarung Kementerian PUPR​
BBWS Cidanau-Ciujung-Cijurian                                                                496.203.864   Proyek Karian Dam-JO                                                              19/10/2015         30/09/2024
PPK Jalan Bebas Hambatan Serang - Panimbang 1 Provinsi Banten                                493.312.754   Tol Serpan Seksi 3B                                                               29/12/2023         24/01/2025
PT Pertamina Patra Niaga                                                                     475.400.000   Proyek Pembangunan Jetty 1 Baru di IT Manggis                                     31/07/2024         22/01/2026
PT Pelabuhan Indonesia II (Persero)                                                          448.515.153   D&B Pengerukan Alur dan Kolam Pelabuhan Benoa Paket A                             30/11/2021         19/07/2024
Kementerian Perhubungan Republik Indonesia                                                   446.687.870   Civil Works (CW) Sea Port 1: Works for Reconstruction of Donggala Port            16/02/2022         04/02/2024
Kementerian Perhubungan Republik Indonesia                                                   446.687.869   Civil Works (CW) Sea Port 1: Works for Reconstruction of Donggala Port            16/02/2022         04/02/2024
Otorita Ibu Kota Nusantara                                                                   426.989.214   Peningkatan Jalan Paket G di KIPP 1B-1C                                           11/06/2025         01/01/2026
Kementerian Pekerjaan Umum Direktorat Jenderal Sumber Daya Air                               426.989.214   Peningkatan Jalan Paket G di KIPP 1B-1C                                           11/06/2025         01/01/2026
PT Perusahaan Listrik Negara (Persero)                                                       417.010.611   KHS PLN 2023                                                                      29/03/2023         28/03/2024
Kementerian Pekerjaan Umum Dan Perumahaman Rakyat                                            415.329.637   Banjir Tenggang                                                                   03/03/2025         20/02/2027
Kementerian Kesehatan Indonesia                                                              405.419.189   Rs Persahabatan                                                                   30/11/2022         22/07/2025
PT Surya Dhoho Investama                                                                     404.757.409   Proyek Dhoho Kediri                                                               01/07/2023         18/04/2025
Kementerian Pekerjaan Umum Dan Perumahan Rakyat Republik Indonesia                           401.325.200   IPA Sepaku                                                                        25/07/2024         31/12/2026
PT Perusahaan Listrik Negara (Persero)                                                       397.243.309   KHS PLN 2023 & 2024                                                               30/09/2024         31/12/2025
Kemendikbud                                                                                  384.519.711   ITB Innovation Park (IIP) Bandung Tekonopolis                                     05/07/2022         03/10/2024
Hunian Pekerja Konstruksi (Hpk) Tahap Ii - Paket 2                                           383.828.010   Hunian Pekerja Konstruksi (HPK) Tahap II - Paket 2                                13/09/2024         31/12/2024
PT Perusahaan Listrik Negara (Persero)                                                       381.189.824   Proyek Upper Cisokan Package 1 Lot LA & IB                                        09/10/2015         17/04/2026
Bank Indonesia                                                                               372.738.000   BI DKUT Gresik                                                                    08/08/2024         09/07/2025
Dirjen Sumber Daya Air Balai Besar Wilayah Sungai Pemali - Juana SNVT                        367.883.734   Proyek Rumah Pompa Drainase Kencing
                                                                                                                                                                                             15/12/2023         02/01/2025
Pelaksanaan Jaringan Sumber Air Pemali - Juana
Kementerian Pendidikan, Kebudayaan, Riset Dan Teknologi                                      358.528.598   Pembangunan Gedung 1 dan 2 ITB Innovation Park (IIP) Bandung Teknopolis
                                                                                                                                                                                             05/07/2022         03/10/2024
KSO WIKA - WRK                                                                               351.349.520   Operation & Maintenance PLTMG Paket III                                           01/03/2021         31/07/2025
Kementerian PUPR Balai Jasa Konstruksi Wil.Jabar                                             341.051.272   Proyek Bendungan Cipanas Paket 3                                                  10/12/2021         28/09/2024
Bank Indonesia                                                                               340.883.220   Kantor Perwakilan BI Papua Barat                                                  08/09/2023         30/05/2025
Kementerian Pekerjaan Umum Dan Perumahan Rakyat Republik Indonesia                           334.630.410   Proyek Revitalisasi Rumah Susun Wisma Atlet Kemayoran                             26/08/2024         22/04/2025
PT Mega Andalan Sukses                                                                       320.345.811   Pek Design & Build, Perijinan dan Pembangunan Jembatan Sungai Cisadane
                                                                                                                                                                                             01/11/2021         30/04/2024
Kementerian Pekerjaan Umum Direktorat Jenderal Cipta Karya                                   312.060.827   Sewerage Pipe Installation Nipah Kuning B - CWIP-03                               12/01/2026         26/06/2029
Bank Indonesia                                                                               307.102.000   Pekerjaan Pembangunan Gedung Kantor Perwakilan Bank Indonesia (Kpwbi)
                                                                                                                                                                                             08/09/2023         30/05/2025
Pulomas Jaya                                                                                 300.650.000   Proyek PMJ Land Tower                                                             11/12/2023         28/10/2025
PT Dua Samudera Perkasa                                                                      300.000.000   CCSP 3 GROGOT                                                                     27/05/2025         26/03/2027
PT Dua Samudera Perkasa                                                                      299.050.000   Jetty Wanam                                                                       01/07/2024         31/12/2025
PPK Irigasi dan Rawa VI SNVT PJPA Cimanuk Cisanggarung ​                                     298.838.784   Proyek Irigasi Rentang Package LSS-07
                                                                                                                                                                                             01/02/2023         10/11/2025
Balai Besar Wilayah Sungai Cimanuk Cisanggarung Kementerian PUPR​
Kementerian Pekerjaan Umum Dan Perumahaman Rakyat                                            297.777.061   Jragung Lanjutan                                                                  19/12/2024         19/12/2026
Kemeterian Pekerjaan Umum Direktorat Jenderal Prasaran Strategis                             295.354.195   Pembangunan Asrama Atlet dan Prasarana Pendukung CYSC                             29/12/2025         21/06/2027
Kementerian Pekerjaan Umum Dan Perumahan Rakyat Republik Indonesia                           291.855.856   IKN Kantor Presiden Basement                                                      11/02/2022         17/10/2025
EPC Waterflood Lapangan Sintong                                                              289.850.000   EPC Waterflood Lapangan Sintong                                                   21/10/2025         20/10/2027
PPK Air Minum - Satker Pelaksanaan Prasarana Pemukiman Wilayah II                            289.698.105   Proyek Spam Wosusokas 2                                                           24/07/2023         14/01/2025
Kementerian Pekerjaan Umum Direktorat Jenderal Cipta Karya                                   288.990.675   Sewerage Pipe Installation Martapura B - CWIP-05                                  13/02/2026         26/07/2030
Kementrian PUPR Cipta Karya                                                                  281.360.000   Stadion Surajaya Lamongan                                                         28/12/2023         01/01/2025
PT Kilang Pertamina Internasional                                                            279.300.000    EPC Restorasi Tangki Mogas 42T01 E/F/G/H PT. Kilang Pertamina Internasional
                                                                                                                                                                                             28/08/2023         26/12/2026
                                                                                                           RU VI Balongan
PT Dua Samudera Perkasa                                                                      277.500.000   CHS Bunati Line 3                                                                 01/04/2024         30/09/2025
Kementerian Pekerjaan Umum Dan Perumahan Rakyat Republik Indonesia                           275.090.884   Rehabilitasi dan Renovasi Stadion Teladan, Kota Medan                             28/12/2023         31/12/2024
PT Surya Dhoho Investama                                                                     269.395.000   Proyek Dhoho Kediri                                                               01/07/2023         18/04/2025
PPK Air Minum - Satker Pelaksanaan Prasarana Pemukiman Wilayah II                            263.419.823   Proyek Spam Wosusokas 4                                                           24/07/2023         14/01/2025
Kemen PUPR Dirjen Sda Balai Besar Wil.S.Bengawan Solo SNVT Pemb.Bendungan                    263.071.509   Proyek Pembangunan Bendungan Karangnongko di Kabupaten Bojonegoro Paket
                                                                                                                                                                                             18/09/2023         18/01/2027
Bengawan Solo                                                                                              1
Kemendiktisaintek                                                                            261.983.017   Pengadaan Pekerjaan Konstruksi Pembangunan SMA Unggul Garuda Provinsi
                                                                                                                                                                                             13/02/2026         10/09/2026
                                                                                                           Kalimantan Utara
Tokushukai Medical Group                                                                     259.164.390   Proyek Pembangunan Gedung Rumah Sakit Harapan Kita - Tokushukai                   21/11/2024         20/09/2026
PPK Sanitasi I, Satuan Kerja Pelaksanaan Prasarana Permukiman Wilayah Jakarta                258.687.626   Proyek JSS Package 2
Metropolitan, Balai Prasarana Permukiman Wilayah Jakarta Metropolitan, Directorate
                                                                                                                                                                                             13/07/2023         12/11/2027
General Of Human Settlements, Ministry Of Public Works And Housing

Bintan Offshore Marine Center                                                                248.631.550   Fasilitas BOMC                                                                    22/04/2026         16/06/2027
Kementerian Kesehatan Republik Indonesia                                                     248.432.000   RS Onkologi Klaten                                                                29/11/2024         22/05/2026
Pelaksanaan Jalan Nasional Wilayah I Provinsi Kalbar Ditjen                                  240.887.626   Duplikasi Jembatan Kapuas 1 (MYC)                                                 16/08/2022         17/03/2024
Dirjen Sumber Daya Air Balai Besar Wilayah Sungai Pemali - Juana SNVT                        234.107.748   Proyek Rumah Pompa Drainase Kencing
Pelaksanaan Jaringan Sumber Air Pemali - Juana                                                                                                                                               15/12/2023         02/01/2025

Bina Penataan Bangunan I Dan Prasarana Strategis Satuan Kerja Pelaksanaan                    224.781.000   Pembangunan Gedung Cibubur Youth Elite Sport Center
                                                                                                                                                                                             27/12/2023         31/12/2024
Prasarana Permukiman Wilayah Jakarta Metropolitan
Bank Indonesia                                                                               220.749.585   Pekerjaan Rancang dan Bangun BI Modern Office                                     30/05/2023         23/05/2024
PPK Air Minum - Satker Pelaksanaan Prasarana Pemukiman Wilayah II                            219.809.691   Proyek Spam Wosusokas 4                                                           24/07/2023         14/01/2025
Bank Mandiri                                                                                 219.500.000   Mandiri Kendari                                                                   03/11/2024         26/02/2026
Kementerian Pekerjaan Umum Dan Perumahaman Rakyat Bendahara                                  215.768.192   Jaringan Perpipaan Air Limbah 1 dan 3 KIPP IKN                                    15/11/2023         08/04/2025
Pembangunan Hunian Modular Tni (Hmt) di IKN                                                  213.100.000   Pembangunan Hunian Modular TNI (HMT) DI IKN                                       31/05/2024         27/11/2024
Universitas Diponegoro                                                                       213.050.000   Paket Pekerjaan Pengadaan Jasa Konstruksi Terintegrasi Pembangunan Tower
                                                                                                                                                                                             06/01/2024         27/09/2025
                                                                                                           Undip Tembalang
PT Pertamina Geothermal Energy                                                               209.608.580   Lumut Balai Unit Geothermal FCRS and Power Plant Project                          29/12/2022         28/12/2025
Badan Meteorologi, Klimatologi Dan Geofisika                                                 207.887.000   Pengembangan Sistem Operasional INATEWS (Gedung Jakarta dan Bali)                 31/01/2024         30/01/2025
Kementerian Pekerjaan Umum Dan Perumahaman Rakyat Bendahara                                  198.993.610   Pembangunan Flyover Arteri Madukoro                                               18/04/2023         26/05/2024
Direktorat Jenderal Perhubungan Darat Kementerian Perhubungan                                198.507.890   Pembangunan BRT Metropolitan Mebidang - Paket Halte On Corridor                   27/02/2026         27/06/2027
PT Citra Karya Jabar Tol                                                                     195.431.262   Longsor Cisumdawu Bojongtotor KM 177                                              30/06/2025         28/10/2025
Yayasan Warisan Nilai Luhur Indonesia                                                        194.900.000   Pembangunan Gedung Sekolah Tinggi Pendidikan Holistik STPHBK
PPK Supan 1 - Snvt Pelaksanaan Jaringan Sumber Air Pemali Juana – BBWS                       191.246.679   Proyek Pembangunan Bendung Karet Sungai Juana
                                                                                                                                                                                             29/09/2022         31/10/2024
Pemali Juana​
Pelaksanaan Cipta Karya Wilayah II Jakarta Metropolitan Direktorat Jenderal Cipta            188.042.898   Pembangunan Reservoir DC Semanan Sistem Hilir SPAM Regional Karian -
                                                                                                                                                                                             24/11/2025         16/07/2027
Karya Kementerian Pekerjaan Umum                                                                           Serpong
Kementerian Pekerjaan Umum Dan Perumahan Rakyat Republik Indonesia                           187.497.446   Proyek Polman Bandung                                                             28/12/2023         26/12/2024
PT Kaltim Prima Coal                                                                         186.750.000   MWRD KPC                                                                          05/01/2023         31/12/2024
PUPR Direktorat Bina Marga Balai Besar Pelaksanaan Jalan Nasional Dki Jakarta -              185.066.296   Jembatan Kaca Sukamahi
                                                                                                                                                                                             10/09/2024         31/12/2025
Jawa Barat Satker Pjn Wilayah V Javar Ppk 5.3 Jabar
Kementrian Perhubungan Indonesia                                                             185.053.827   Civil Works (CW) Sea Port 2: Works for Reconstruction of Wani Port                16/02/2022         04/02/2024
PT Dua Samudera Perkasa                                                                      185.000.000   CCS Tanah Grogot line 2                                                           18/10/2023         08/08/2025
PPK Air Minum - Satker Pelaksanaan Prasarana Pemukiman Wilayah II                            184.369.391   Proyek Spam Wosusokas 2                                                           24/07/2023         14/01/2025
Kementerian Pekerjaan Umum Dan Perumahaman Rakyat Bendahara                                  180.905.992   Pembangunan Flyover Arteri Madukoro                                               18/04/2023         27/04/2024

                                                                                                               149

Page 159
PT WIJAYA KARYA (PERSERO) Tbk                                                                                                                     PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                                                                               AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                                                                            NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                                                                                        FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                                                                                           For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                                                                                    June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                                                                                                  And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                                                                                                 Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                                                                                               (In Thousand Rupiah, unless Otherwise Stated)
                              Pemberi Kerja/                                         Nilai Kontrak /                                    Nama Proyek /                                        Masa Pelaksanaan / Period of Time
                                  Owner                                              Contract Value                                   Name of Projects                                       Mulai / Started    Selesai / Ended
PU Bina Marga                                                                                177.219.413   Pembangunan Fo Jl. Sudirman (Muara Enim)                                            15/12/2025         04/12/2027
Kementerian PUPR Direktorat Jenderal SDA BBWS Sulawesi III                                   176.506.001   Works for PASIGALA raw water transmission system rehabilitation (Paket 1); Kab.
                                                                                                           Sigi; Sulawesi Tenga                                                                25/10/2021         29/02/2024

PT Colas Rail Philippines                                                                   176.064.636    Metro Manila Subway Project CP106                                                   01/01/2026         01/12/2026
Kementerian Pekerjaan Umum Dan Perumahaman Rakyat Bendahara                                 175.517.022    Pembangunan Jalan dan Jembatan Tumbang Samba - Tumbang Hiran II                     27/05/2022         14/11/2024
Kementerian Pekerjaan Umum Dan Perumahaman Rakyat Bendahara                                 174.524.919    Pembangunan sistem persinyalan dan telekomunikasi jalur ganda kereta api
                                                                                                                                                                                               30/07/2021         30/03/2024
                                                                                                           antara Mojokerto - Sepanjan
PT Telkom Landmark Tower                                                                    173.526.300    Pembangunan Gedung Fasilitas Pendukung TLT Tower 1                                  15/05/2024         15/09/2025
PT Pupuk Kaltim                                                                             171.150.000    Dredging Tursina                                                                    20/02/2023         10/10/2024
PT Pupuk Kalimantan Timur                                                                   170.160.000    Penyiapan Lahan Industri PKT Bontang                                                21/12/2021         26/02/2024
PPK Air Minum - Satker Pelaksanaan Prasarana Pemukiman Wilayah II                           167.645.918    Proyek Spam Wosusokas 4                                                             24/07/2023         14/01/2025
Direktorat Jenderal Bina Marga – Bbpjn Jawa Timur-Bali – Ppk 3.4 Prov. Jawa Timur​          166.918.566    Proyek Pembangunan FO Aloha
                                                                                                                                                                                               01/11/2022         23/04/2024
PUPR Direktorat Bina Marga Balai Besar Pelaksanaan Jalan Nasional DKI Jakarta -             166.726.393    Jembatan Kaca Sukamahi
                                                                                                                                                                                               10/09/2024         31/12/2025
Jawa Barat Satker PJN Wilayah V Javar PPK 5.3 Jabar
PT SNVT Pelaksanaan Jaringan Pemanfaatan Air Serayu-Opak                                    164.382.533    Revitalization of Banjarcahyana                                                     16/09/2022         31/05/2024
PT Pelabuhan Indonesia II (Persero)                                                         161.813.590    Relokasi Jalan Sei Duri - Mempawah Kalbar (Lingkar Kijing)                          29/11/2021         31/05/2025
Kementerian Pekerjaan Umum Dan Perumahaman Rakyat                                           160.960.573    Jragung Lanjutan                                                                    19/12/2024         19/12/2026
PT Indah Kiat Pulp & Paper Tbk                                                              158.492.250    Pekerjaan Pembangunan Jembatan Akses Utama IKK                                      12/06/2025         12/06/2026
SNVT Pelaksanaan Jaringan Pemanfaatan Air Brantas, PPK Irigasi dan Rawa II                  157.133.024    Rehabilitasi Bendung Jatimlerek Kab Jombang
                                                                                                                                                                                               15/12/2025         04/12/2027

Perumda Sarana Jaya                                                                         155.250.000    Pembangunan Hunian Terjangkau Tower B Nuansa Cilangkap                              26/08/2024         19/11/2025
KSO WIKA - Nindya Karya                                                                     153.831.258    Jembatan SBG Tol Serang - Panimbang 3B (WIKA)                                       16/12/2024         16/08/2025
PT Pembangunan Perumahan (Persero) Tbk                                                      151.859.301    Smelter Kolaka                                                                      15/05/2024         11/08/2024
Pengelolaan Dan Penyelenggara Serta Pengendalian Mutu Infrastruktur Kawasan                 151.621.056    IPA Tembesi
                                                                                                                                                                                               22/04/2024         18/12/2024
Bank Indonesia                                                                              150.250.000    Proyek Pembangunan Bangunan Pendukung Kawasan Bank Indonesia di
                                                                                                           Karawang (PK-12)                                                                    10/01/2024         13/02/2026

PT Integrasi Transit Jakarta                                                                148.200.000    Pembangunan Ruangan Multifungsi (Extended Concourse) Stasiun MRT Bawah
                                                                                                                                                                                               23/02/2026         22/06/2027
                                                                                                           Tanah di Kawasan Bundaran Hotel Indonesia (WIKA - RAU, KSO)
ITB                                                                                         147.377.158    Pembangunan Gedung Labtek XV ITB                                                    14/11/2023         05/02/2025
Kemen Pupr Dirjen Sda Dir.Sungai Dan Pantai Satker Nvt Pembangunan Terpadu                  147.296.050    Proyek Pengaman Pantai Jakarta Tahap 6 Paket 4
                                                                                                                                                                                               26/12/2022         31/12/2024
Pesisir Ibukota Negara Ppk Pelaksana Ptpin I
Kementerian Kesehatan Republik Indonesia                                                    145.965.000    Proyek RSUD Bobong Kab. Pulau Taliabu                                               26/02/2025         22/12/2025
PT Jhonlin Baratama                                                                         145.000.000    HSD Tank 6x5000                                                                     02/05/2024         30/04/2025
PPK Otoritas Jasa Keuangan                                                                  144.378.000    Kantor OJK Medan                                                                    22/10/2025         22/11/2025
Kementerian Kesehatan Republik Indonesia                                                    139.090.000    Proyek RSUD Maba Kab. Halmahera Timur                                               07/03/2025         07/03/2026
Kementerian PUPR - Satker Pelaksanaan Jalan Nasional Wilayah IV Provinsi                    137.374.113    Proyek Pembangunan Underpass Gatoto Subroto
                                                                                                                                                                                               26/09/2023         31/12/2024
Sumatra Utara
Kementerian Pekerjaan Umum Dan Perumahan Rakyat Direktorat Jenderal Bina                    136.480.773    Proyek Jalan Pelabuhan Teluk Tapang
                                                                                                                                                                                               12/09/2022         05/09/2024
Marga Balai Pelaksanaan Jalan Nasional Sumatera Barat Wilayah 1
KSO WIKA - PP - Hutama Karya                                                                132.457.800    Pengadaan Jembatan SBG Japek Selatan                                                29/12/2023         31/05/2024
Satuan Kerja Pelaksanaan Prasarana Permukiman Wilayah Ii Jakarta Metropolitan,              119.065.020    Proyek Res Pondok Kopi
Balai Prasarana Permukiman Wilayah Jakarta Metropolitan, Direktorat Jenderal Cipta
                                                                                                                                                                                               04/07/2023         29/12/2024
Karya, Kementerian Pekerjaan Umum Dan Perumahan Rakyat

Kementerian Perhubungan, Direktorat Jenderal Perhubungan Udara, Direktorat                  118.920.339    Bandar Udara Banggai
Bandar Udara, Kantor Unit Penyelenggarabandar Udara Kelas Ii Syukuran                                                                                                                          15/12/2022         29/02/2024
Aminuddin Amir Luwuk
PT Wijaya Karya Komponen Beton                                                              117.437.862    PC Sleeper Metro Manila Subway Project CP106 - BJR                                  02/01/2026         02/01/2027
Peningkatan Dan Rehabilitasi Jaringan Irigasi Peterongan Di Mrican Paket 1                  115.969.568    Proyek Irigasi DI Mrican Paket 1                                                    18/04/2023         15/12/2024
Kementerian Pekerjaan Umum Dan Perumahan Rakyat Direktorat Jendral Bina                     115.426.216    Proyek Underpass Joglo
                                                                                                                                                                                               27/11/2023         25/11/2024
Marga
PT Transportasi Jakarta                                                                     103.861.067    Halte Transjakarta - Paket D                                                        12/08/2022         11/04/2024
PT Bank Mandiri (Persero) Tbk                                                               103.000.000    Kantor Bank Mandiri Gresik                                                          23/08/2024         23/08/2025
SNVT Pembangunan Bendungan Bbws Sumatera VIII Ditjen Sumber                                 101.330.444    Revitalisasi Danau Teloko                                                           31/07/2023         31/12/2024
PPK Air Minum Satuan Kerja Pelaksanaan Prasarana Permukiman Wilayah 1                       101.305.887    JDU Mamminasata
                                                                                                                                                                                               07/07/2023         28/08/2024
Provinsi Sulawesi Selatan
PT Dua Samudera Perkasa                                                                     100.000.000    Jetty Bombana                                                                       18/10/2023         17/10/2024



Perusahaan                                                                                                            The Company
PT Kereta Api Indonesia (Persero)                                                                                     PT Kereta Api Indonesia (Persero)
Perusahaan melakukan perjanjian pemanfaatan                                                                           The Company has an agreement with PT Kereta Api
lahan milik PT Kereta Api Indonesia (Persero) yang                                                                    Indonesia (Persero) about utilization of land located
berlokasi di Jalan Laswi, Bandung - Jawa Barat,                                                                       in Laswi, Bandung - West Java based on use right
sesuai dengan sertifikat hak pakai No. 6 tahun 1988                                                                   No. 6 year 1988 with the area of 206,400 sqm on
seluas 206.400 m2 atas nama KAI.                                                                                      behalf of KAI.

Kedua     pihak    telah    menandatangani nota                                                                       Both parties have signed a memorandum of
kesepakatan untuk pemanfaatan lahan dengan                                                                            understanding for land development with number
Nomor         TP.01.03/A.DIR.13154/2017     dan                                                                       TP.01.03/A.DIR.13154/2017        and   KL.701/X/31/
KL.701/X/31/KA-2017 tanggal 10 Oktober 2017                                                                           KA-2017 dated October 10, 2017 with time period of
dengan jangka waktu 50 tahun terhitung setelah                                                                        50 years after grace period of 36 months.
berakhirnya grace period selama 36 bulan.

PT Sarinah (Persero)                                                                                                  PT Sarinah (Persero)
WIKA Gedung melakukan perjanjian bangun, guna,                                                                        WIKA Gedung has an agreement of build, operate,
serah (BOT) dengan PT Sarinah (Persero) tentang                                                                       and transfer (BOT) with PT Sarinah (Persero)
pengembangan property di Jalan Braga No. 10                                                                           regarding the development of property in Braga
Bandung - Jawa Barat sesuai dengan sertifikat hak                                                                     No. 10 Bandung - West Java based on building right
guna bangunan No. 649 seluas 1.763 m2 atas nama                                                                       No. 649 with the area of 1,763 sqm on behalf of
PT Sarinah (Persero).                                                                                                 PT Sarinah (Persero).


                                                                                                               150

Page 160
PT WIJAYA KARYA (PERSERO) Tbk                                               PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                         AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                      NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                  FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                      For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                               June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                             And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                            Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                          (In Thousand Rupiah, unless Otherwise Stated)
Untuk melakukan kerjasama dengan WIKA Gedung,                To have a partnership with WIKA Gedung,
PT Sarinah (Persero) telah memperoleh persetujuan            PT Sarinah (Persero) had obtained approval from
dari Menteri Badan Usaha Milik Negara (BUMN)                 Minister of State-Owned Enterprises (BUMN) as
selaku Rapat Umum Pemegang Saham yang                        General Meeting of Shareholders set forth in letter
tertuang dalam surat No. S-89/MBU/01/2016                    No. S-89/MBU/01/2016 dated January 25, 2016
tertanggal 25 Januari 2016 tentang Persetujuan               regarding Approval of Utilization of Assets owned by
Pendayagunaan Aset Milik PT Sarinah (Persero) di             PT Sarinah (Persero) on Street Braga No. 10
Jl. Braga No. 10 Bandung, Jawa barat. Sedangkan              Bandung West Java. Whereas WIKA Gedung had
WIKA Gedung telah memperoleh persetujuan dari                obtained approval by the shareholders set out in the
para Pemegang Saham yang tertuang dalam                      resolution shareholders outside meeting WIKA
Keputusan Pemegang Saham di luar Rapat WIKA                  Gedung No: MJ.01.00/PS.WG.037/2015 dated
Gedung No: MJ.01.00/PS.WG.037/2015 tertanggal                November 13, 2015 about decision shareholders out
13 November 2015 tentang Keputusan Pemegang                  meeting of WIKA Gedung.
Saham diluar Rapat WIKA Gedung.

WIKA Gedung telah merencanakan jumlah investasi              WIKA Gedung has planned for the funding required
yang akan ditanamkan untuk membangun hotel dan               to build the hotel and supporting facilities with an
fasilitas penunjang dengan investasi awal sebesar            initial investment of Rp81,192,000, with the term of
Rp81.192.000 dengan jangka waktu Pengelolaan                 the management for 25 years. Whereas PT Sarinah
selama 25 tahun. Sedangkan PT Sarinah (Persero)              (Persero) is entitled for the collection of land lease of
berhak atas pembayaran sewa lahan sebesar 3,33%              3.33% of the tax object value of land every year as
dari nilai NJOP tanah setiap tahunnya sebagaimana            stationed in regulation of the Ministry of Finance
tertera dalam Peraturan Kementerian Keuangan                 No: 33/PMK.06/2012, and is eligible to receive
No: 33/PMK.06/2012 dan berhak mendapatkan                    commercial space of 132 sqm during the period of
Ruang Komersial seluas 132 m2 selama masa                    the agreements without charged for rent and service.
berlakunya perjanjian kerja sama tanpa dikenakan
biaya sewa ruang dan biaya jasa.

WIKA Gedung berkewajiban menyerahkan kembali                 WIKA Gedung is obliged to hand over and transfer
dan mengalihkan objek BOT pada tanggal                       the BOT object on the date of transfer of buildings
pengalihan bangunan dan penyerahan kembali tanah             and land without obligation of PT Sarinah (Persero)
tanpa adanya kewajiban ganti rugi yang diberikan             to provide compensation to WIKA Gedung arising
PT Sarinah (Persero) kepada WIKA Gedung sebagai              from this agreement.
bentuk penyerahan dan atau transfer yang timbul
dalam perjanjian kerja sama ini.

Pertamina Mandalika International Street Circuit             Pertamina Mandalika International Street Circuit
WIKA Gedung melakukan perjanjian Bangun, Sewa,               WIKA Gedung agreed into a Build, Lease, and
Serah dengan PT Pengembangan Pariwisata                      Transfer agreement with PT Pembangunan Wisata
Indonesia (Persero) (“ITDC”) tentang Pembangunan             Indonesia (Persero) (“ITDC”) regarding Paddock
Paddock di ITDC Mandalika Tourism Complex, Kuta,             Development at ITDC Mandalika Tourism Complex,
Pujut, Kabupaten Lombok Tengah, Nusa Tenggara                Kuta, Pujut, Central Lombok Regency, West Nusa
Barat   dengan     nilai  kerja    sama   sebesar            Tenggara with the value of cooperation is
Rp195.405.930.                                               Rp195,405,930.

Untuk melakukan kerja sama dengan WIKA Gedung,               To cooperate with WIKA Gedung, ITDC had
ITDC telah menetapkan WIKA Gedung sebagai mitra              appointed WIKA Gedung as a Cooperation partner
Kerja Sama berdasarkan Surat Perintah Kerja                  based on the Work Order No. 318/DIR
No. 318/DIR/ITDC.01/X/2021 tanggal 7 Oktober                 /ITDC.01/X/2021 dated October 7, 2021.
2021.

WIKA Gedung telah menyelesaikan pembangunan                  WIKA Gedung has completed the construction of the
objek kerja sama tersebut yang dibuktikan dengan             object of cooperation as evidenced by the Minutes of
Berita Acara Serah Terima, pada tanggal                      Handover, on December 24, 2021, and ITDC started
24 Desember 2021 dan ITDC memulai masa sewa                  the lease period for the object of cooperation until
atas objek kerja sama tersebut hingga 30 Juni 2023.          June 30, 2023.

                                                           151

Page 161
PT WIJAYA KARYA (PERSERO) Tbk                                             PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                       AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                    NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                     For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                              June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                            And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                           Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                         (In Thousand Rupiah, unless Otherwise Stated)
Pada tanggal 31 Desember 2024, objek kerja sama              As of December 31, 2024, the object of cooperation
belum diserahkan kepada ITDC karena pembayaran               has not yet transferred to ITDC due to outstanding
termin terakhir dari nilai kerja sama belum dilunasi.        receivable terms.

Pada akhir periode sewa dan setelah ITDC                     At the end of the lease period and after ITDC makes
melakukan pembayaran penuh atas nilai kerja sama,            full payment of the cooperation value, the ownership
maka kepemilikan atas objek kerja sama akan secara           of the object of cooperation will automatically
otomatis beralih ke ITDC.                                    transfer to ITDC.

WIKA Serang Panimbang (WSP)                                  WIKA Serang Panimbang (WSP)
Perjanjian Pengusahaan Jalan Tol (PPJT)                      Toll Road Concession Agreement (PPJT)
WSP       telah  memperoleh     penetapan   hak              WSP has acquired the right of toll road concession
pengusahaan jalan tol (Hak Konsesi) Serang-                  (Concession Right) Serang-Panimbang issued by
Panimbang yang diterbitkan oleh Pemerintah                   the Government, in accordance with the Minister of
berdasarkan Keputusan Menteri Pekerjaan Umum                 Public     Works      Decree   No.KU.03.01-Mn/02
No.KU.03.01-Mn/02 tanggal 4 Januari 2017 yang                dated January 4, 2017, followed by the signing of
kemudian ditindaklanjuti dengan penandatanganan               the PPJT for each toll road dated February 22,
PPJT pada tanggal 22 Februari 2017 dengan masa               2017 with concession period of 40 (forty) years,
konsesi selama 40 (empat puluh) tahun, yang                  and effectively applied since Work Start Order has
berlaku efektif sejak Surat Perintah Mulai Kerja             been issued.
diterbitkan.

PPJT mengalami perubahan pertama pada tanggal                PPJT firstly ammended on June 8, 2017 through
8 Juni 2017 melalui Akta Notaris No. 6 dari Rina             Notarial Deed No. 6 from Rina Utami Djauhari, S.H.,
Utami Djauhari, S.H., perubahan kedua pada tanggal           the second amendment on October 3, 2018 through
3 Oktober 2018 melalui Akta Notaris No. 7 dari Rina          Notarial Deed No. 7 from Rina Utami Djauhari, S.H.,
Utami Djauhari, S.H., dan perubahan ketiga pada              and the third amendment on July 9, 2019 through
tanggal 09 Juli 2019 melalui Akta Notaris No. 22 dari        Notarial Deed No. 22 from Rina Utami Djauhari, S.H.
Rina Utami Djauhari, S.H.

Berdasarkan Akta Notaris No. 18 tahun 2021 tanggal           Based on Notarial Deed No. 18 of 2021 dated June
11 Juni 2021 mengenai Amandemen IV Perjanjian                11, 2021 concerning Amendment IV of the Serang
Pengusahaan Jalan Tol Ruas Serang Panimbang                  Panimbang Toll Road Concession Agreement made
dibuat dihadapan Rina Utami Djauhari S.H., Notaris           in presence of Rina Utami Djauhari S.H., Notary in
di Jakarta yang di dalamnya termasuk perubahan               Jakarta which includes amendment the concession
masa konsesi menjadi 50 tahun.                               period to 50 years.

Pada tanggal 28 November 2024, WSP telah                     On November 28, 2024, WSP has obtained a Bank
mendapatkan Bank Garansi untuk jaminan                       Guarantee for implementation guarantee from
pelaksanaan dari PT Bank Mandiri (Persero) Tbk               PT Bank Mandiri (Persero) Tbk which will mature on
yang jatuh tempo pada 31 Maret 2025 sebesar                  March 31, 2025 amounting to Rp85,753,710.
Rp85.753.710.

Perjanjian Pendanaan Pengadaan Tanah untuk                   Land Acquisition Funding Agreement for Toll
Jalan Tol                                                    Road
Menurut perubahan kedua PPJT dengan Badan                    According to PPJT's second amendment with Badan
Layanan Umum-Badan Pengatur Jalan Tol (BLU-                  Layanan Umum-Badan Pengatur Jalan Tol (BLU-
BPJT), WSP selaku Badan Usaha Jalan Tol (BUJT)               BPJT), WSP as a Badan Usaha Jalan Tol (BUJT)
setuju dan berkewajiban untuk terlebih dahulu                agree and obliged to provide land acquisition funds
menyediakan dana pengadaan tanah untuk jalan tol.            for toll roads in advances.

Penggunaan dana BUJT terlebih dahulu dalam                   The use of BUJT funds in the land acquisition in
pengadaan tanah tersebut disetujui oleh Menteri              advance was approved by the Minister of Finance
Keuangan     melalui   surat  dengan     nomor               through a letter No. S-679/MK.06/2018 dated
S-679/MK.06/2018 tertanggal 6 September 2018.                September 6, 2018. In the letter the Ministry of
Dalam surat tersebut Kementerian Keuangan                    Finance approved the use of business entity funds

                                                           152

Page 162
PT WIJAYA KARYA (PERSERO) Tbk                                              PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                        AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                     NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                 FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                     For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                              June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                            And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                           Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                         (In Thousand Rupiah, unless Otherwise Stated)
menyetujui penggunaan dana badan usaha terlebih              first for the construction of National Strategic
dahulu untuk pembangunan Proyek Strategis                    Projects in the form of toll road and support any
Nasional berupa jalan tol dan mendukung setiap               policy aimed at accelerating the completion of the
kebijakan yang ditujukan untuk mempercepat                   National Strategic Project as long as it is carried out
penyelesaian Proyek Strategis Nasional sepanjang             in accordance with applicable regulations.
dilaksanakan sesuai dengan ketentuan yang berlaku.

Pendanaan pengadaan tanah dalam rangka                       Land acquisition funding in the context of
pelaksanaan Proyek Strategis Nasional diatur dalam           implementing the National Strategic Project is
Peraturan Presiden No. 102 tahun 2016 dan tata               regulated in Presidential Decree No. 102
cara pendanaan pengadaan tanah bagi Proyek                   year 2016 and the procedures for funding land
Strategis  Nasional   diatur   dalam     Peraturan           acquisition for National Strategic Projects are
Menteri Keuangan No. 21/PMK.06/2017.                         regulated in Minister of Finance Regulation No.
                                                             21/PMK.06/2017.

Kontrak Pekerjaan Jasa Konstruksi Rancang                    Construction Design Construction Service
Bangun Dengan Kontrak Terima Jadi Paket 2                    Contract with Turn Key Contract 2 (Package 2
(Kontrak Paket 2)                                            Contract)
Pada tanggal 4 Desember 2017, WSP dan PT PP                  On December 4, 2017, WSP and PT PP (Persero)
(Persero) Tbk (PTPP) menandatangani Kontrak                  Tbk (PTPP) signed the Package 2 Contract in the
Paket 2 berupa pembangunan konstruksi simpang                form of construction of the interchange of the Serang
susun jalan tol Serang Panimbang. Di dalam kontrak           Panimbang toll road. In the contract, the scope of
tersebut, lingkup pekerjaan yang akan dilakukan oleh         work to be carried out by PTPP are:
PTPP adalah:
• Perencanaan detail engineering design simpang              •   Plan the detail engineering design of the
    susun untuk jalan tol Serang Panimbang                       interchange for Serang Panimbang toll road for 7
    sebanyak 7 unit; dan                                         units; and
• Konstruksi simpang susun sebanyak 5 unit.                  •   Construction of interchanges for 5 units.

Jenis Kontrak Paket 2 adalah kontrak terima jadi             The type of Package 2 Contract is a turn key
(turn key) dan bersifat gabungan lumpsum dan                 contract and combination of lump sum and unit price
harga satuan dengan total nilai kontrak sebesar              with a total contract amounting to Rp600,916,000.
Rp600.916.000. Pembayaran atas nilai kontrak                 Payment of the contract is a lumpsum with the
tersebut adalah secara sekaligus dengan ketentuan            clause no later than 60 days after the Minutes of
paling lambat 60 hari setelah Berita Acara Serah             Temporary Hand Over.
Terima Sementara.

Perjanjian Kontrak Paket 2 telah mengalami                   The Package 2 Contract Agreement has been
perubahan,    terakhir   berdasarkan     Perjanjian          amended, most recently based on Agreement
No.TP.01.03/A.DIR.WSP.001/2023 tanggal 6 Januari             No.TP.01.03/A.DIR.WSP.001/2023 dated January 6,
2023, WSP dan PT Pembangunan Perumahan                       2023, WSP and PT Pembangunan Perumahan
(Persero) Tbk sepakat untuk melakukan perubahan              (Persero) Tbk agreed to amend the Package 2
Kontrak Paket 2, pada beberapa hal dibawah ini:              Contract on the following matters:
• Penyesuaian Lingkup Pekerjaan;                             • Adjustment of Work Scope;
• Penyesuaian Jenis dan Nilai Kontrak menjadi                • Adjustment of Contract Type and Value to
   Rp974.074.602;                                               Rp974,074,602;
• Penyesuaian Jangka Waktu Pelaksanaan; dan                  • Adjustment of Implementation Period; and
• Mengubah Serah Terima Pekerjaan                            • Change the Handover.

WIKA Realty                                                  WIKA Realty
PT Bintang Express Sejahtera                                 PT Bintang Express Sejahtera
Pada tanggal 18 Juli 2018, PT Wijaya Karunia                 On July 18, 2018, PT Wijaya Karunia Realtindo
Realtindo (Entitas Asosiasi) (WKR) mengikat diri             (Associate) (WKR) entered into a Sale and Purchase
dalam Perjanjian Pengikatan Jual Beli (PPJB) untuk           Agreement (PPJB) to purchase 36 Ha of land worth
membeli     tanah    seluas    36     Ha    senilai          Rp3,036,000,000 in Rorotan, North Jakarta from
Rp3.036.000.000 di Rorotan, Jakarta Utara dari               PT Bintang Express Sejahtera with payment of
                                                           153

Page 163
PT WIJAYA KARYA (PERSERO) Tbk                                                 PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                           AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                    FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                        For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                 June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                               And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                              Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                            (In Thousand Rupiah, unless Otherwise Stated)
PT Bintang Express Sejahtera dengan pembayaran               money gradual ground level.
uang muka tanah bertahap.

Pada tanggal 29 Agustus 2023, berdasarkan putusan            On August 29, 2023, based on the decision of the
Badan Arbitrase Nasional Indonesia No. 45094/                Indonesian National Arbitration Board No. 45094/XI
XI/ARB-BANI/2022     yang     dimohonkan      oleh           /ARB-BANI/2022 requested by PT Bintang Express
PT Bintang Express Sarana, diputuskan WKR                    Sarana, it was decided that WKR (Respondent I) and
(Termohon I) dan WIKA Realty (Termohon II) telah             WIKA Realty (Respondent II) had defaulted by not
wanprestasi dengan tidak memenuhi seluruh                    fulfilling all agreed stages of land down payment.
tahapan pembayaran uang muka tanah yang
disepakati.

Dalam keputusan ini, atas jumlah uang muka tanah             In this decision, the land advance payment that WKR
yang      sudah     dibayarkan   WKR     sebesar             has paid amounting to Rp1,066,000,000 is the full
Rp1.066.000.000 adalah sepenuhnya menjadi hak                right of PT Bintang Express Sarana.
PT Bintang Express Sarana.
Berdasarkan Keputusan Pengadilan Negeri Jakarta              Based on the decision of the East Jakarta District
Timur pada tanggal 1 Desember 2023 yang                      Court on December 1, 2023 which stated that the
menyatakan bahwa Pengadilan Negeri Jakarta Timur             East Jakarta District Court accepted the The
menerima permohonan pembatalan untuk putusan                 nullifying of arbitral decision.
Arbitrase tersebut.

Dalam upaya Permohonan Kasasi oleh PT Bintang                In response to the appeal filed by PT Bintang Expres
Expres Sarana atas Putusan Perkara Nomor:                    Sarana regarding the Decision on Case Number:
583/PDT.SUS-ARB/2023/PN.JKT TIM tanggal 1                    583/PDT.SUS-ARB/2023/PN.JKT            TIM     dated
Desember 2023, dimana pada Tanggal 13 Februari               December 1, 2023, the Supreme Court of Indonesia
2024 telah terbit Putusan Mahkamah Agung RI                  issued a ruling on February 13, 2024, under Case
Perkara Nomor: 234 B/Pdt.Sus-Arbt/2024 yang                  Number: 234 B/Pdt.Sus-Arbt/2024, which decided to:
memutuskan:
• Menerima Permohonan Banding dari Pemohon I                     • Accept the appeal requests from Appellants I and
  dan II;                                                          II;
• Mengabulkan      Permohonan  Banding    dari                   • Grant the appeal requests from Appellants I and
  Pemohon I dan II;                                                II;
• Membatalkan Putusan PN Jakarta Timur Nomor:                    • Overturn the East Jakarta District Court Decision
  583/PDT.SUS-ARB/2023/PN.JKT TIM; dan                             Number:583/PDT.SUS-ARB/2023/PN.JKTTIM;and
• Menguatkan Putusan BANI Nomor 45094/XI/ARB-                    • Uphold     the    BANI      Decision     Number
  BANI/2022.                                                       45094/XI/ARB-BANI/2022.

KRJ                                                          KRJ
Akuisisi Saham                                               Share Acquisition
Pada tanggal 30 April 2025, KRJ menambah                     On April 30, 2025, KRJ increased its ownership
kepemilikan saham IBKJ dari Mitsubishi Estate Co.,           interest in IBKJ by acquiring shares from Mitsubishi
Ltd, dengan nilai transaksi sebesar Rp294.480.000,           Estate Co., Ltd. for a total consideration of
sehingga kepemilikan KRJ di IBKJ menjadi sebesar             Rp294,480,000, resulting in KRJ holding a 100%.
100%.

Tabel berikut merangkum jumlah aset teridentifikasi          The following table summarises the identifiable
yang diperoleh yang diambil-alih pada tanggal                assets acquired taken over at the acquisition date:
akuisisi adalah:




                                                           154

Page 164
PT WIJAYA KARYA (PERSERO) Tbk                                                 PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                           AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                    FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                        For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                 June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                               And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                              Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                            (In Thousand Rupiah, unless Otherwise Stated)
                                                           Rp
Aset Neto yang diperoleh                                                                                     Net Assets
Kas dan Bank                                                 138,590                          Cash and Cash Equivalent
Pajak Dibayar Dimuka                                      17,069,709                                       Prepaid Taxes
Bangunan Dalam Konstruksi                                727,378,688                        Buildings Under Construction
Aset Pajak Tangguhan                                         857,417                                 Deferred Tax Assets
Utang Lain-lain                                              (15,314)                                    Other Payables
Utang Pihak Berelasi                                   (123,618,598)                                Due to Related Party

Jumlah Aset Neto                                           621,810,492                                  Total Net Asset

Porsi Kepemilikan yang Diperoleh                                  100%                               Proportion Acquired

Porsi Kepemilikan atas Nilai Wajar Aset Neto               621,810,492                  Share of Fair Value of Net Assets
Nilai Pengalihan                                           481,051,873                           Purchase Consideration

Selisih Nilai Transaksi dengan                                                             Difference in Fair Value with
 Nilai Wajar Aset Neto                                     140,758,619                              Identified Assets


Selisih nilai transaksi dengan nilai aset bersih IBKJ           The difference between the transaction value and the
sebesar Rp140.758.619 dialokasikan ke bangunan                  net asset value of IBKJ of Rp140,758,619 is
dalam konstruksi IBKJ yang disajikan sebagai                    allocated to the building under construction of IBKJ
persediaan pada laporan keuangan konsolidasian                  which presented as inventories in the consolidated
(Catatan 11).                                                   financial statement (Note 11).
Sehubungan dengan akuisisi aset tersebut, maka                  In connection wth the assets acquisition, IBKJ
laporan keuangan IBKJ terhitung sejak tanggal                   financial statements since date of acquisition are
akuisisi dikonsolidasi ke dalam laporan keuangan                consolidated to the consolidated financial statements
konsolidasian Grup (Catatan 1.e).                               of the Group (Note 1.e).

WIKA Tirta Jaya Jatiluhur                                       WIKA Tirta Jaya Jatiluhur
Perjanjian Kerjasama Pemerintah dengan Badan                    Agreement of Cooperation between Government
Usaha Sistem Penyediaan Air Minum Regional                      and Enterprises on Drinking Water Supply
Jatiluhur I                                                     Systems Jatiluhur I Regional
WTJJ telah memperoleh hak pengusahaan Sistem                    WTJJ has obtained the concession rights for the
Penyediaan Air Minum Regional Jatiluhur I yang                  Drinking Water Supply System Jatiluhur I Region
diterbitkan oleh Pemerintah berdasarkan Keputusan               issued by the Government based on the Decree of
Menteri Pekerjaan Umum dan Perumahan Rakyat                     the Minister of Public Works and Public Housing No.
No. PB.02.01-Mn/2335 tanggal 20 November 2020                   PB.02.01-Mn/2335 dated November 20, 2020 which
yang        kemudian      ditindaklanjuti  dengan               was then followed up with the signing of the
ditandatanganinya Perjanjian Kerjasama Pemerintah               Government Cooperation Agreement with Business
dengan Badan Usaha (PKPBU) Sistem Penyediaan                    Entities (PKPBU) Drinking Water Supply System
Air Minum Regional I pada tanggal 19 Februari 2021              Jatiluhur I Region on February 19, 2021 with a
dengan masa konsesi selama 30 (tiga puluh) tahun                concession period of 30 (thirty) years starting from
yang dimulai sejak tanggal penandatanganan.                     the date of signing.
PKPBU mengalami perubahan pertama pada tanggal                  PKPBU had undergone its first amendment on
19 Agustus 2021 melalui penandatanganan                         August 19, 2021 through the signing of First
Amendemen       Kesatu     Perjanjian   Kerjasama               Amendment of the Government Cooperation
Pemerintah    dengan     Badan     Usaha    Sistem              Agreement with Business Entities Drinking Water
Penyediaan      Air     Minum        Regional     I             Supply     System       Jatiluhur  I     Region
No. TP.01.03/A.Dir/00057/2021.                                  No. TP.01.03/A.Dir/00057/2021.

Perjanjian Paket Rancang Bangun Sistem                          Design and Construction Package of Drinking
Penyediaan Air Minum Regional Jatiluhur I                       Water Supply Systems Jatiluhur I Regional
dengan KSO WIKA - JAYA                                          Agreement with JO WIKA - JAYA
Berdasarkan Perjanjian Paket Rancang Bangun                     Based on Agreement of Design and Construction
Sistem Penyediaan Air Minum Regional Jatiluhur I                Package of Drinking Water Supply Systems Jatiluhur
                                                           155

Page 165
PT WIJAYA KARYA (PERSERO) Tbk                                              PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                        AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                     NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                 FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                      For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                               June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                             And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                            Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                          (In Thousand Rupiah, unless Otherwise Stated)
No.     TP.01.01/A.DIR.60/WTJJ/IV/2021       tanggal         I Regional No. TP.01.01/A.DIR.60/WTJJ/IV/2021
16 April 2021, WTJJ menyerahkan pekerjaan                    dated April 16, 2021, WTJJ delegates the design and
perancangan dan pembangunan Sistem Penyediaan                construction works of Drinking Water Supply
Air Minum Regional Jatiluhur I kepada KSO WIKA –             Systems Jatiluhur I Regional to JO WIKA – JAYA.
JAYA.     Nilai   dari   perjanjian   ini   sebesar          This agreement        has    value   amounting to
Rp1.357.040.000. Jangka waktu perjanjian ini                 Rp1,357,040,000. The term of the agreement start
terhitung sejak ditandatanganinya perjanjian hingga          from the signing of the agreement until the signing of
ditandatanganinya Berita Acara Serah Terima Hasil            Minutes of Handover of Final Results.
Akhir Pekerjaan.

Perjanjian ini telah mengalami beberapa kali                 This agreement has been amended several times,
amendemen        yang    terakhir   pada    tanggal          the latest on June 26, 2023 through the signing of the
26 Juni 2023 melalui penandatangan amendemen                 amendment to the Jatiluhur I Regional Water Supply
Perjanjian    Paket    Rancang    Bangun     Sistem          System Design and Build Agreement No.
Penyediaan Air Minum Regional Jatiluhur I No.                TP.01.03/WTJJ. Dir.00119/2023, has been agreed
TP.01.03/WTJJ.Dir.00119/2023, telah di sepakati              Total Work Value of Rp1,436,115,947.
Total Nilai Pekerjaan sebesar Rp1.436.115.947.

b. Kontinjensi                                               b.    Contingencies
Perusahaan                                                   The Company
Klaim PT Angkasa Pura I                                      PT Angkasa Pura I Claims
Berdasarkan Laporan Hasil Evaluasi BPKP dengan               Based on the BPKP’s Evaluation Report with
Nomor PE.09.03/R/LHP-03/D502/2/2024 tanggal 28               Number PE.09.03/R/LHP-03/D502/2/2024 dated
Februari 2024, yang melibatkan PT Angkasa Pura I             February 28, 2024, involving PT Angkasa Pura I and
dan Perusahaan disebutkan bahwa formula                      the Company, it was stated that the price adjustment
penyesuaian       harga    yang   digunakan      dalam       formula used in the contract amendment (CCO-3)
perubahan kontrak (CCO-3) tidak mencerminkan                 did not reflect market prices. This resulted in delays
harga pasar. Hal ini menyebabkan penundaan dalam             in the completion of the Sultan Hasanuddin
penyelesaian Proyek Pengembangan Bandar Udara                Makassar Airport Development Project (PPUPG).
Sultan Hasanuddin Makassar (PPUPG). Kedua belah              Both parties agreed to adjust the contract terms by
pihak sepakat untuk menyesuaikan ketentuan                   using market prices for the remaining work, where
kontrak dengan menggunakan harga pasar untuk                 the final value will be determined based on the
sisa pekerjaan, di mana nilai akhir akan ditentukan          lowest amount between PT Wijaya Karya's proposal
berdasarkan nilai terendah antara usulan PT Wijaya           and the independent evaluation results. This
Karya dan hasil evaluasi independen. Kesepakatan             agreement is final and cannot be further revised by
ini bersifat final dan tidak dapat direvisi lebih lanjut     the Company.
oleh Perusahaan.

Perusahaan  menerima     hasil  putusan             dan      The Company accepted the results of the decision
membebankan klaim PT Angkasa Pura I.                         and charged PT Angkasa Pura I's claim.

WIKA Gedung                                                  WIKA Gedung
Gugatan WIKA Gedung kepada PT Maju                           WIKA Gedung's lawsuit against PT Maju
Gemilang Serpong terkait Wanprestasi melalui                 Gemilang Serpong regarding Default through
BANI                                                         BANI
WIKA Gedung membuat, menandatangani dan                      WIKA Gedung made, signed and submitted a
mengajukan Permohonan Mengadakan Arbitrase                   Request for Arbitration and / or Statement of Claim at
dan/atau Permohonan Arbitrase di Badan Arbitrase             the Indonesian National Arbitration Board (“BANI”)
Nasional Indonesia (“BANI”) Jakarta terhadap                 Jakarta against PT Maju Gemilang Serpong, in
PT Maju Gemilang Serpong, sehubungan dengan                  connection with the default action committed by
tindakan wanprestasi yang dilakukan oleh PT Maju             PT Maju Gemilang Serpong on the Work Agreement
Gemilang Serpong atas Surat Perjanjian Kerja                 Letter No. B-Residence-040/SPK/MGS/III/ 17 dated
No. B-Residence-040/SPK/MGS/III/17 tanggal 6 April           April 6, 2017 concerning the B Residence Apartment
2017 tentang Proyek Apartemen B Residence,                   Project, Serpong for Structural and Plumbing Work.
Serpong atas Pekerjaan Struktur dan Plumbing.


                                                           156

Page 166
PT WIJAYA KARYA (PERSERO) Tbk                                              PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                        AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                     NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                 FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                      For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                               June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                             And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                            Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                          (In Thousand Rupiah, unless Otherwise Stated)
WIKA Gedung telah memenangkan proses di BANI                 WIKA Gedung has won the process at BANI but
tetapi pihak PT Maju Gemilang Serpong sedang                 PT Maju Gemilang Serpong is submitting an effort to
mengajukan upaya pembatalan keputusan BANI.                  cancel BANI's decision.
Selanjutnya, berdasarkan penetapan No.42/Eks.                Furthermore, regarding resolution No.42/Eks.
Arb/2022/PN.Jkt.Brt tanggal 25 Agustus 2023,                 Arb/2022/PN.Jkt.Brt dated August 25, 2023, Civil
Pengadilan Negeri Tangerang sedang dalam proses              Court of Tangerang is in process of seizure and
sita eksekusi dan pelelangan atas aset PT Maju               auction of assets belong to PT Maju Gemilang
Gemilang Serpong.                                            Serpong.

Untuk tahun yang berakhir pada tanggal                       For the year ended December 31, 2025, WIKA
31 Desember 2025, WIKA Gedung masih menunggu                 Gedung is still waiting for the verdict on the process
putusan atas proses sita eksekusi dan pelelangan             of seizure and auction of assets belong to PT Maju
atas aset PT Maju Gemilang Serpong.                          Gemilang Serpong.

Gugatan WIKA Gedung kepada PT Alumindo                       The Company's lawsuit against PT Alumindo
Cipta Persada terkait Wanprestasi                            Cipta Persada related to Contract Default
Pada Maret 2023, WIKA Gedung menggugat                       In March 2023, WIKA Gedung filed lawsuit against
PT Alumindo Cipta Persada di PN Jakarta Selatan              PT Alumindo Cipta Persada at South Jakarta High
atas wanprestasi yang dilakukan pemberi kerja.               Court regarding default of contract from project
Sampai dengan tanggal penerbitan laporan                     owner. As of the published date of consolidated
keuangan konsolidasian, statusnya masih berproses            financial statements, the Company is still conducting
di pengadilan.                                               legal process.

Total gugatan WIKA Gedung kepada PT Alumindo                 The total claim from WIKA Gedung against
Cipta Persada adalah sebesar Rp12.393.912.                   PT Alumindo Cipta Persada amounted to
                                                             Rp12,393,912.

WIKA Beton                                                   WIKA Beton
Pemerolehan Aset Tanah                                       Acquisition of Land Assets
Sehubungan dengan pembelian Lahan seluas 50 Ha               Regarding the purchase of a 50-hectare land in
di Desa Karangmukti, Kecamatan Cipeundeuy,                   Karangmukti Village, Cipeundeuy District, Subang
Kabupaten Subang, Provinsi Jawa Barat untuk                  Regency, West Java Province for the development of
pengembangan Pabrik Produk Beton di Subang,                  a Concrete Product Factory in Subang, WIKA Beton
WIKA       Beton   telah    melaporkan   Pengurus            reported the Management of PT Agrawisesa
PT Agrawisesa Widyatama ke Bareskrim Mabes                   Widyatama to the Criminal Investigation Agency of
POLRI pada tahun 2017 atas dugaan tindak pidana              the Indonesian National Police (Bareskrim Mabes
penipuan dan/atau penggelapan perjanjian jual beli           POLRI) in 2017 for alleged criminal acts of fraud
yang dilakukan oleh WIKA Beton dan PT Agrawisesa             and/or embezzlement related to the sales agreement
Widyatama sebagaimana Laporan Polisi No.                     conducted by WIKA Beton and PT Agrawisesa
LP/1342/XII/2017/Bareskrim tertanggal 7 Desember             Widyatama, as documented in the Police Report No.
2017. Pelaporan ini dilakukan karena PT Agrawisesa           LP/1342/XII/2017/Bareskrim dated December 7,
Widyatama tidak melakukan pemecahan atas                     2017. This report was made because PT Agrawisesa
Sertifikat Hak Guna Bangunan (SHGB) No. 722                  Widyatama did not execute the division of the
seluas     1.996.977    m2     sebagaimana    telah          Building Rights Certificate (SHGB) No. 722 covering
diperjanjikan, dan diketahui SHGB tersebut telah             an area of 1,996,977 sqm as previously agreed
diserahkan/dijaminkan kepada pihak lain.                     upon, and it was found that the SHGB had been
                                                             transferred or pledged to another party.

Dalam Putusan No. 589/Pid-B/2020/PN.JktSel                   In    Decision     No.      589/Pid-B/2020/PN.JktSel
tanggal 16 September 2020, memutuskan bersalah               September 16, 2020, the South Jakarta District Court
saudara Muhammad Ali dengan pidana penjara                   found Muhammad Ali guilty of 1 year imprisonment.
1 tahun. Atas putusan tersebut Muhammad Ali                  Muhammad Ali filed an appeal against the decision
mengajukan proses banding di Pengadilan Tinggi di            at the High Court in DKI Jakarta. For this, the High
DKI Jakarta. Atas hal tersebut, Pengadilan Tinggi            Court in decision No 441/PID/2020/PT.DKI dated
dalam putusan No 441/PID/2020/PT.DKI tanggal 14              December 14, 2020 sentenced Muhammad Ali to a
Desember 2020 menjatuhkan pidana penjara selama              prison sentence of 3 years.

                                                           157

Page 167
PT WIJAYA KARYA (PERSERO) Tbk                                               PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                         AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                      NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                  FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                      For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                               June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                             And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                            Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                          (In Thousand Rupiah, unless Otherwise Stated)
3 tahun kepada saudara Muhammad Ali.

Selain itu WIKA Beton juga telah melakukan upaya-            In addition, the WIKA Beton has also made non-
upaya penyelesaian non litigasi dengan mengajukan            litigation resolution efforts by proposing the
pembatalan sebagian sertifikat dari SHGB 722                 cancellation of the certificate from SHGB 722
melalui Kanwil BPN Provinsi Jawa Barat dan telah             partially through the West Java Provincial BPN
terbit surat rekomendasi pembatalan sertifikat               Regional Office and a recommendation letter of for
tersebut oleh Kanwil BPN Provinsi Jawa Barat                 that certificate cancellation has been issued by the
kepada Kementerian Agraria dan tata Ruang/BPN                West Java Provincial BPN Regional Office to the
Pusat       dengan      nomor        MP.01.01/1083-          Ministry of Agrarian and Spatial Planning/ Central
32.600/VII/2020 tanggal 20 Juli 2020.                        BPN with number MP.01.01/ 1083-32.600/VII/2020
                                                             dated July 20, 2020.

Atas surat permohonan dan rekomendasi tersebut,              On the request and recommendation letter, a
telah terbit surat keterangan  dari Kementerian              statement letter from the Ministry of Agrarian and
Agraria dan Tata Ruang/BPN yang menerangkan                  Spatial Planning/ BPN has been issued which states
sampai dengan saat ini      masih dalam proses               that until now it is still in the handling process at the
penanganan di Kementerian Agraria dan Tata                   Ministry of Agrarian and Spatial Planning/ BPN.
Ruang/BPN.      (Sebagaimana    Surat  Direktur              (As stated in the Letter of the Director for Prevention
Pencegahan dan Penanganan Sengketa dan Konflik               and Handling of Land Disputes and Conflicts at the
Pertanahan pada Kementerian Agraria dan Tata                 Ministry of Agrarian Affairs and Spatial Planning/
Ruang/BPN tanggal 5 Februari 2021 Nomor SK.                  BPN dated February 5, 2021 Number SK. 06.03/28-
06.03/28-800.38/11/2021).                                    800.38/11/2021).

Selanjutnya Atas Laporan WIKA Beton sebagaimana              Furthermore, based on WIKA Beton's report as
dijelaskan sebelumnya, Sdr. Muhammad Ali (Direktur           explained earlier, Mr. Muhammad Ali (President
Utama Agrawisesa Widyatama) terbukti secara sah              Director of Agrawisesa Widyatama) has been proven
dan dinyatakan bersalah melakukan tindak pidana              legitimately and declared guilty of committing a
sebagaimana Pasal 378 jo. 55 KUHP dan dijatuhkan             criminal act under Article 378 jo. 55 of the Criminal
hukuman pidana 3 tahun penjara sebagaimana                   Code (KUHP) and has been sentenced to 3 years in
Putusan Pengadilan Negeri Jakarta Selatan No.                prison according to the South Jakarta District Court
589/Pid.B/2020/PN Jkt. Sel jo. Putusan Pengadilan            Decision No. 589/Pid.B/2020/PN Jkt. Sel jo. Jakarta
Tinggi Jakarta No. 441/PD/2020/PTDKI jo. Putusan             High Court Decision No. 441/PD/2020/PTDKI
Mahkamah Agung No. 571K/PID/2021.                            jo. Supreme Court Decision No. 571K/PID/2021.

Sdr. Burhanuddin (Komisaris Utama Agrawisesa)                Mr. Burhanuddin (President Commissioner of
terbukti secara sah dan dinyatakan bersalah                  Agrawisesa) has also been proven legitimately and
melakukan tindak pidana sebagaimana Pasal 378 jo.            declared guilty of committing a criminal act under
55 KUHP dan dijatuhkan hukuman 3 tahun 10 bulan              Article 378 jo. 55 of the Criminal Code (KUHP), and
sebagaimana Putusan Pengadilan Negeri Jakarta                has beensentenced to 3 years and 10 months,
Selatan No. 1154/Pid.B/2021/PN Jkt.Sel tanggal 17            according to the South Jakarta District Court
Maret 2022 jo. Putusan Pengadilan Tinggi No.                 Decision No. 1154/Pid.B/2021/PN Jkt.Sel dated
106/PID/2022/PT.DKI jo. Putusan Mahkamah Agung               March 17, 2022, jo. Jakarta High Court Decision No.
No. 1177/K.PID/2022.                                         106/PID/2022/PT.DKI jo. Supreme Court Decision
                                                             No. 1177/K.PID/2022.

Pada tanggal 11 Desember 2024, WIKA Beton                    On December 11, 2024, WIKA Beton, as the
selaku Penggugat mengajukan gugatan perbuatan                Complainant, filed a lawsuit for unlawful act through
melawan hukum melalui Pengadilan Negeri Subang               the Subang District Court against PT Agrawisesa
terhadap PT Agrawisesa Widyatama dan PT Bank                 Widyatama and PT Bank QNB Indonesia Tbk as the
QNB Indonesia Tbk selaku Para Tergugat dan                   Defendants and against the National Defense
terhadap Badan Pertahanan Nasional / Kantor                  Agency / Subang District Land Office as the Co
Pertanahan Kabupaten Subang selaku Turut                     Defendant.
Tergugat.



                                                           158

Page 168
PT WIJAYA KARYA (PERSERO) Tbk                                                       PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                 AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                              NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                          FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                               For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                        June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                                      And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                                     Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                                   (In Thousand Rupiah, unless Otherwise Stated)
Berdasarkan dokumen gugatan diperoleh informasi                     Based on the lawsuit documents obtained,
bahwa gugatan diajukan WIKA Beton terkait                           information was obtained that the lawsuit was issued
penerbitan sertifikat dari SHGB 722 melalui Sidang                  by WIKA Beton regarding the issuance of a
Pengadilan    Negeri       Subang  No.    58/Pdt.G                  certificate from SHGB 722 through the Subang
/2024/PN.Sng yang masih dalam proses mediasi                        District Court Hearing No. 58/Pdt.G/2024/PN.Sng
                                                                    which is still in the mediation process.

Sebagai tindak lanjut proses pidana, WIKA Beton                     As a follow-up to the criminal proceedings, WIKA
selanjutnya akan melakukan upaya upaya hukum                        Beton will further pursue legal efforts to obtain legal
lanjutan guna mendapatkan kepastian hukum atas                      certainty regarding the land, allowing WIKA Beton to
lahan sehingga sertifikat lahan dapat diperoleh WIKA                obtain the land certificate.
Beton.

Berdasarkan dokumen dan fakta-fakta serta tahapan                   Based on documents and facts as well as the stages
proses yang telah WIKA Beton lakukan, WIKA Beton                    of the process that WIKA Beton has carried out,
memiliki legal standing yang kuat dan proses                        WIKA Beton has a strong legal standing and the
perolehan sertifikat akan dapat diselesaikan.                       certificate attainment process will be completed.

54. Instrumen Keuangan,              Manajemen          Risiko          54. Financial Instruments, Financial Risk and
    Keuangan dan Modal                                                                          Capital Management

A. Kategori dan Kelas Instrumen Keuangan                            A. Categories and Classes of Financial
                                                                    Instruments
                                                     2026                 2025
                                                      Rp                   Rp
Aset Keuangan yang Diukur pada                                                                      Financial Assets Measured
  Biaya Perolehan Diamortisasi                                                                             at Amortized Cost
  Kas dan Setara Kas                                1.933.204.280         2.754.958.146             Cash and Cash Equivalent
  Bank Dibatasi Penggunaannya                          27.972.447           450.121.356                        Restricted Bank
  Piutang Usaha                                     1.648.686.249         1.559.360.966                    Trade Receivables
  Piutang Retensi                                     762.159.828           762.346.229                 Retention Receivables
  Tagihan Bruto Pemberi Kerja                       2.920.592.100         1.490.957.845      Gross Amount Due From Customer
  Piutang yang Belum Ditagih                          561.594.661           490.733.477                  Unblilled Receivables
  Piutang Lain-lain                                   223.106.731           279.399.429                      Other Receivable
  Aset Lain-lain*)                                    216.948.734           282.483.452                          Other Assets*)
                                                    8.294.265.030         8.070.360.900
Aset Keuangan yang Diukur pada Nilai                                                              Financial Assets at Fair Value
  Wajar Melalui Laba Rugi (FVTPL)                                                              Through Profit or Loss (FVTPL)
  Investasi Jangka Panjang Lainnya                  1.039.409.327         1.024.409.327           Other Long Term Investments
Total                                               9.333.674.357         9.094.770.227                                     Total

Liabilitas Keuangan pada Biaya                                                                              Financial Liabilities
  Perolehan Diamortisasi                                                                                     at Amortized Cost
  Pinjaman Jangka Pendek                              224.762.103          241.672.324                      Short-Term Loans
  Utang Usaha                                       4.321.631.297        4.267.234.965                         Trade Payables
  Beban Akrual                                      5.186.996.841        5.028.917.894                      Accrued Expenses
  Pinjaman Jangka Menengah                          1.545.000.000        1.545.000.000                     Medium Term Notes
  Liabilitas Sewa                                       3.605.782           11.066.377                        Lease Liabilities
  Pinjaman Jangka Panjang                          20.637.251.836       21.319.306.852                        Long-Term Loan
  Utang Lain-lain                                   3.347.949.176        2.860.629.013                         Other Payables
  Obligasi                                          7.990.466.910        7.986.561.991                                   Bond
  Sukuk Mudharabah                                  2.272.315.000        2.272.315.000                     Sukuk Mudharabah
Total                                              45.529.978.945       45.532.704.416                                      Total

*) Terdiri dari Dana yang Dibatasi Penggunaannya                                                    *) Consist of Restricted Funds




                                                                159

Page 169
PT WIJAYA KARYA (PERSERO) Tbk                                               PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                         AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                      NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                  FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                      For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                               June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                             And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                            Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                          (In Thousand Rupiah, unless Otherwise Stated)
B. Tujuan dan kebijakan manajemen risiko                     B. Financial Risk Management Policies and
   keuangan                                                     Objectives
   Risiko-risiko utama yang timbul dari instrumen               The main risks arising from financial instruments
   keuangan yang dimiliki Grup adalah risiko suku               held by the Group are interest rate, foreign
   bunga, risiko mata uang asing, risiko kredit dan             currency risk, credit risk and liquidity risk. The
   risiko likuiditas. Kegiatan operasional Grup                 Group's operational activities are carried out
   dijalankan secara hati-hati dengan mengelola                 carefully by managing those risks in order not to
   risiko-risiko tersebut agar tidak menimbulkan                incur any potential losses for the Group.
   potensi kerugian bagi Grup.

i.   Manajemen risiko mata uang asing                        i. Foreign currency risk management
     Risiko mata uang asing adalah risiko di mana               Foreign exchange risk is the risk that the fair
     nilai wajar atau arus kas kontraktual masa                 value or future contractual cash flows of a
     datang dari suatu instrumen keuangan akan                  financial instrument will be affected due to
     terpengaruh akibat perubahan nilai tukar.                  changes in exchange rates. The Group’s
     Eksposur Grup yang terpengaruh risiko nilai                exposures to foreign exchange risk.
     tukar.

     Selain pinjaman jangka panjang, Grup memiliki               In addition to long-term loans, the Group has
     eksposur dalam mata uang asing yang timbul                  exposure in foreign currencies arising from its
     dari transaksi operasionalnya. Eksposur tersebut            operational transactions. Such exposure arises
     timbul karena transaksi yang bersangkutan                   because the relevant transaction is made in a
     dilakukan dalam mata uang selain mata uang                  currency other than the functional currency of the
     fungsional unit operasional atau pihak lawan.               operating unit or the other party. The exposure in
     Eksposur dalam mata uang asing tersebut                     such foreign currency is immaterial.
     jumlahnya tidak material.

     Aset dan liabilitas moneter dalam mata uang                 The monetary assets and liabilities denominated
     asing pada tanggal 30 Juni 2026 dan 31                      in foreign currencies as of June 30, 2026 and
     Desember 2025 diungkapkan dalam Catatan 50.                 December 31, 2025 are disclosed in Note 50.

 ii. Manajemen risiko tingkat bunga                          ii. Interest rate risk management
     Risiko suku bunga adalah risiko di mana nilai               Interest rate risk is the risk that the fair value or
     wajar atau arus kas kontraktual masa datang                 contractual future cash flows of a financial
     dari   suatu   instrumen    keuangan    akan                instrument will be affected due to changes in
     terpengaruh akibat perubahan suku bunga                     market interest rates. The Group’s exposures to
     pasar. Eksposur Grup yang terpengaruh risiko                interest rate risk relates primarily to short-term
     suku bunga terutama terkait dengan pinjaman                 loans, long-term loans and finance lease
     jangka pendek, pinjaman jangka panjang dan                  liabilities.
     utang sewa pembiayaan.

     Untuk meminimalkan risiko suku bunga, Grup                  To minimize interest rate risk, the Group manages
     mengelola beban bunga melalui kombinasi                     interest expense through fixed rate and variable-
     utang dengan suku bunga tetap dan suku bunga                rate debt combinations and by evaluating the
     variabel   dan       dengan      mengevaluasi               tendency of the market interest rates.
     kecenderungan suku bunga pasar. Manajemen                   Management also conducts a review of the
     juga melakukan penelaahan berbagai suku                     various interest rates offered by creditors to
     bunga yang ditawarkan oleh kreditur untuk                   obtain favorable interest rates before making a
     mendapatkan suku bunga yang menguntungkan                   decision to initiate a new debt obligation.
     sebelum    mengambil       keputusan    untuk
     melakukan perikatan utang baru.

     Eksposur Grup terhadap suku bunga dalam aset                The Group’s exposures to interest rates on
     keuangan dan liabilitas keuangan dirinci dalam              financial assets and financial liabilities are
     bagian manajemen risiko likuiditas pada catatan             detailed in the liquidity risk management section
     ini.                                                        of this note.

                                                           160

Page 170
PT WIJAYA KARYA (PERSERO) Tbk                                               PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                         AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                      NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                  FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                       For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                              And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                             Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                           (In Thousand Rupiah, unless Otherwise Stated)
    Analisis sensitivitas suku bunga                             Interest rate sensitivity analysis
    Analisis sensitivitas di bawah ini telah ditentukan          The sensitivity analyses below had been
    berdasarkan eksposur suku bunga untuk                        determined based on the exposure to interest
    instrumen keuangan pada akhir periode                        rates for financial instruments at the end of the
    pelaporan. Untuk liabilitas tingkat bunga                    reporting period. For floating rate liabilities, the
    mengambang, analisis tersebut disusun dengan                 analysis is prepared assuming the amount of the
    asumsi jumlah liabilitas terutang pada akhir                 liability outstanding at the end of the reporting
    periode pelaporan itu terutang sepanjang tahun.              period was outstanding for thewhole year.

    Kenaikan atau penurunan tingkat bunga 1%                     A 1% increase or decrease in interest rates is
    digunakan tingkat melaporkan risiko suku bunga               used when reporting interest rate risk internally to
    secara internal kepada karyawan kunci dan                    key employees and represents management’s
    merupakan penilaian manajemen terhadap                       assessment of possible changes in interest rates.
    perubahan yang mungkin terjadi pada suku
    bunga.

 iii. Manajemen risiko kredit                                iii. Credit risk management
      Risiko kredit mengacu pada risiko rekanan                   Credit risk refers to the risk that a counterparty
      gagal      dalam    memenuhi     kewajiban                  will default on its contractual obligation resulting
      kontraktualnya yang mengakibatkan kerugian                  in financial loss to the Group.
      keuangan bagi Grup.

    Risiko kredit Grup terutama melekat pada                     The Group’s credit risk is primarily attributed to its
    rekening bank, tagihan bruto pemberi kerja,                  cash in banks, gross amount due from
    piutang usaha, piutang retensi dan piutang lain-             customers, retention receivables and other
    lain. Grup menempatkan saldo bank pada                       accounts receivable. The Group places its bank
    institusi keuangan yang layak serta terpercaya.              balances with credit worthy financial institutions.
    Piutang usaha dilakukan dengan pihak ketiga                  Trade accounts receivable are entered with
    terpercaya dan pihak berelasi.                               respected and credit worthy third parties and
                                                                 related parties.

    Eksposur Grup dan rekanan dimonitor secara                   The Group’s exposure and its counterparties are
    terus menerus dan nilai agregat transaksi terkait            continuously monitored and the aggregate value
    tersebar di antara pihak lawan yang telah                    of transactions concluded is spread amongst
    disetujui. Eksposur kredit dikendalikan oleh                 approved counterparties. Credit exposure is
    batasan pihak lawan yang di review dan                       controlled by counterparty limits that are reviewed
    disetujui oleh komite manajemen risiko secara                and approved by the risk management committee
    tahunan.                                                     annually.

    Nilai tercatat aset keuangan pada laporan posisi             The carrying amount of financial assets recorded
    keuangan konsolidasian setelah dikurangi                     in the consolidated statements of financial
    dengan cadangan kerugian mencerminkan                        position, net of any allowance for losses
    eksposur Grup terhadap risiko kredit.                        represents the Group’s exposure to credit risk.

 iv. Manajemen risiko likuiditas                             iv. Liquidity risk management
     Tanggung jawab utama untuk manajemen risiko                 Ultimate     responsibility for   liquidity    risk
    likuiditas terletak pada dewan direksi, yang telah           management rests with the board of directors,
    membentuk kerangka kerja manajemen risiko                    which has established an appropriate liquidity risk
    likuiditas yang sesuai untuk manajemen Grup                  management framework for the management of
    dan pendanaan jangka pendek-menengah dan                     the Group’s short-medium and long-term funding
    jangka panjang dan persyaratan manajemen                     and liquidity management requirements.
    likuiditas.

    Grup mengelola risiko likuiditas dengan                      The Group manages liquidity risk by maintaining
    memelihara cadangan yang memadai, fasilitas                  adequate reserves, banking facilities and reserve
    perbankan dan fasilitas pinjaman cadangan,                   borrowing facilities, by continuously monitoring

                                                           161

Page 171
PT WIJAYA KARYA (PERSERO) Tbk                                                                                       PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                                                 AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                                              NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                                                          FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                                                             For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                                                      June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                                                                    And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                                                                   Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                                                                 (In Thousand Rupiah, unless Otherwise Stated)
    dengan terus memantau arus kas prakiraan dan                                               forecast and actual cash flows, and by matching
    aktual, dan dengan cara mencocokkan profil                                                 the maturity profiles of financial assets and
    jatuh tempo aset dan liabilitas keuangan.                                                  liabilities.

    Tabel risiko likuiditas dan suku bunga                                                     Liquidity and interest risk tables
    Tanggung jawab utama untuk manajemen risiko                                                The ultimate responsibility for liquidity risk
    likuiditas terletak pada dewan direksi, yang telah                                         management rests with the board of directors,
    membentuk kerangka kerja manajemen risiko                                                  whom has established liquidity risk management
    likuiditas yang sesuai untuk manajemen Grup                                                framework suitable for the management of the
    dan pendanaan jangka pendek – menengah dan                                                 Group’s short – medium and longterm funding as
    jangka panjang dan persyaratan manajemen                                                   well as and liquidity management requirements.
    likuiditas. Grup mengelola risiko likuiditas                                               The Group manages liquidity risk by maintaining
    dengan memelihara cadangan yang memadai,                                                   adequate reserves, banking facilities and reserve
    fasilitas perbankan dan fasilitas pinjaman                                                 borrowing facilities, by continuously monitoring
    cadangan, dengan terus memantau arus kas                                                   forecast and actual cash flows, and by matching
    prakiraan dan aktual, dan dengan cara                                                      the maturity profiles of financial assets and
    mencocokkan profil jatuh tempo aset dan                                                    liabilities.
    liabilitas keuangan.

    Tabel berikut juga merinci ekspektasi jatuh                                                The following table details the Group’s expected
    tempo untuk aset keuangan non-derivatif Grup.                                              maturity for its non-derivative financial assets.
    Tabel disusun berdasarkan jatuh tempo kontrak                                              The table has been drawn up based on the
    tak terdiskonto dari aset keuangan termasuk                                                undiscounted contractual maturities of the
    bunga yang akan diperoleh dari aset tersebut.                                              financial assets including interest that will be
    Dicantumkannya informasi aset keuangan non-                                                earned on those assets. The inclusion of
    derivatif diperlukan dalam rangka untuk                                                    information on non-derivative financial assets is
    memahami manajemen risiko likuiditas Grup di                                               necessary in order to understand the Group
    mana likuiditas dikelola atas dasar aset dan                                               liquidity risk management as the liquidity is
    liabilitas bersih.                                                                         managed on a net asset and liability basis.
                                                                                        2026
                                           Tingkat Bunga
                                              Rata-rata                              3 Bulan Sampai
                                        Tertimbang Efektif/                              1 Tahun/
                                         Weighted Average          1-3 Bulan/          3 Months to         Lebih dari 1 Tahun/    Jumlah/
                                       Effective Interest Rate    1-3 months              1Year             More Than 1 Year       Total
                                                  Rp                   Rp                   Rp                     Rp               Rp
     Aset                                                                                                                                                                      Assets
     Tanpa Bunga                                                                                                                                                Non-Interest Bearing
       Kas                                                   --        16.995.701                    --                      --       16.995.701                     Cash on Hand
       Piutang Usaha                                         --       249.135.386          169.979.958           1.160.140.154     1.579.255.498              Accounts Receivable
       Piutang Retensi                                       --                 --         931.760.788                       --      931.760.788           Rentention Receivables
       Piutang Lain-Lain                                     --                 --         223.106.731                       --      223.106.731                  Other Receivable
       Jaminan Usaha                                         --                 --          24.824.816                       --       24.824.816              Bussiness Guarantee
       Piutang yang Belum Ditagih                            --                 --         561.594.661                       --      561.594.661               Unbilled Receivable
     Instrumen Suku Bunga Mengambang                                                                                                               Floating Interest Rate Instruments
       Kas di Bank                         1,00% - 2,50%            1.875.574.212                     --                     --    1.875.574.212                      Cash In Bank
     Instrumen Suku Bunga Tetap                                                                                                                       Fixed interest rate instruments
       Deposito Berjangka                    4% - 11%                 380.347.130                    --                      --      380.347.130                     Time Deposits
       Piutang Lain-Lain                      9,25%                   223.106.731                    --                      --      223.106.731                  Other Receivable
     Total                                                          2.745.159.160        1.911.266.954           1.160.140.154     5.816.566.269                                Total

     Liabilitas                                                                                                                                                             Liabilities
     Tanpa Bunga                                                                                                                                                Non-Interest Bearing
       Utang Usaha                                          --      4.321.631.297                     --                     --    4.321.631.297          Trade Accounts Payable
       Utang Lain-Lain                                      --      3.347.949.176                     --                     --    3.347.949.176                     Other Payable
       Beban Akrual                                         --      5.186.996.841                     --                     --    5.186.996.841                  Accrued Expense
     Instrumen Suku Bunga Mengambang                                                                                                               Floating Interest Rate Instruments
       Pinjaman Jangka Pendek             3,96% - 11,25%              224.762.103                     --                     --     224.762.103                   Short-Term Loan
     Instrumen Suku Bunga Tetap                                                                                                                       Fixed Interest Rate Instruments
       Liabilitas sewa                      8,4% - 13%                           -                    --                     --                -                   Lease Liabilities
       Pinjaman Jangka Menengah           9,75% - 11,50%            1.545.000.000                     --         1.545.000.000     3.090.000.000                Medium-Term Loan
       Pinjaman Jangka Panjang              4.7 % - 11%                         --                    --        20.375.454.785    20.375.454.785                   Long-Term Loan
       Obligasi                            8.60% - 9.85%                        --                    --         7.793.466.910     7.793.466.910                               Bond
       Sukuk Mudharabah                    8.60% - 9.85%                        --                    --         2.180.815.000     2.180.815.000                Sukuk Mudharabah
     Total                                                         14.626.339.417                     --        31.894.736.695    46.521.076.112                                 Total




                                                                                     162

Page 172
PT WIJAYA KARYA (PERSERO) Tbk                                                                                         PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                                                   AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                                                NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                                                            FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                                                               For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                                                        June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                                                                      And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                                                                     Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                                                                   (In Thousand Rupiah, unless Otherwise Stated)
                                                                                          2025
                                           Tingkat Bunga
                                              Rata-rata                                3 Bulan Sampai
                                        Tertimbang Efektif/                                1 Tahun/
                                         Weighted Average            1-3 Bulan/          3 Months to         Lebih dari 1 Tahun/    Jumlah/
                                       Effective Interest Rate      1-3 months              1Year             More Than 1 Year       Total
                                                  Rp                     Rp                   Rp                     Rp               Rp
     Aset                                                                                                                                                                        Assets
     Tanpa Bunga                                                                                                                                                  Non-Interest Bearing
       Kas                                                   --          21.874.277                    --                      --       21.874.277                     Cash on Hand
       Piutang Usaha                                         --                   --       1.785.165.406                             1.785.165.406              Accounts Receivable
       Piutang Retensi                                       --                   --         926.256.491                       --      926.256.491           Rentention Receivables
       Piutang Lain-Lain                                     --                   --         279.399.429                       --      279.399.429                  Other Receivable
       Jaminan Usaha                                         --                   --         115.831.537                       --      115.831.537              Bussiness Guarantee
       Piutang yang Belum Ditagih                            --                   --         490.733.477                       --      490.733.477               Unbilled Receivable
     Instrumen Suku Bunga Mengambang                                                                                                                 Floating Interest Rate Instruments
       Kas di Bank                         1,00% - 2,50%              3.228.869.543                     --                     --    3.228.869.543                      Cash In Bank
     Instrumen Suku Bunga Tetap                                                                                                                         Fixed interest rate instruments
       Deposito Berjangka                    4% - 11%                 1.117.763.052                    --                      --    1.117.763.052                     Time Deposits
       Piutang Lain-Lain                       9%                       279.399.429                    --                      --      279.399.429                  Other Receivable
     Total                                                            4.647.906.301        3.597.386.340                       --    8.245.292.641                                Total

     Liabilitas                                                                                                                                                               Liabilities
     Tanpa Bunga                                                                                                                                                  Non-Interest Bearing
       Utang Usaha                                          --                    -                     --                     --                -          Trade Accounts Payable
       Utang Lain-Lain                                      --        2.860.629.013                     --                     --    2.860.629.013                     Other Payable
       Beban Akrual                                         --        5.028.917.894                     --                     --    5.028.917.894                  Accrued Expense
     Instrumen Suku Bunga Mengambang                                                                                                                 Floating Interest Rate Instruments
       Pinjaman Jangka Pendek             3,96% - 11,25%                241.672.324                     --                     --     241.672.324                   Short-Term Loan
     Instrumen Suku Bunga Tetap                                                                                                                         Fixed Interest Rate Instruments
       Liabilitas sewa                      8,4% - 13%                   10.815.282                     --                     --       10.815.282                   Lease Liabilities
       Pinjaman Jangka Menengah           9,75% - 11,50%              1.545.000.000                     --         1.545.000.000     3.090.000.000                Medium-Term Loan
       Pinjaman Jangka Panjang              4.7 % - 11%                           --                    --        20.439.596.860    20.439.596.860                   Long-Term Loan
       Obligasi                            8.60% - 9.85%                          --                    --         6.549.061.991     6.549.061.991                               Bond
       Sukuk Mudharabah                    8.60% - 9.85%                          --                    --         1.153.690.000     1.153.690.000                Sukuk Mudharabah
     Total                                                            9.687.034.513                     --        29.687.348.851    39.374.383.364                                 Total




C. Manajemen Permodalan                                                                                                   C. Capital Management
   Grup mengelola modal untuk memastikan bahwa                                                   The Group manages it capital to ensure that
   entitas dalam Grup akan mampu untuk                                                           entities in the Group will be able to continue as a
   melanjutkan      kelangsungan    hidup,      selain                                           going concern, in addition to maximizing the
   memaksimalkan keuntungan para pemegang                                                        profits of the shareholders through the
   saham melalui optimalisasi saldo utang dan                                                    optimization of the balance of debt and equity.
   ekuitas. Struktur modal Grup terdiri dari pinjaman                                            The Group capital structure consists of debt offset
   yang saling hapus dengan kas dan setara kas                                                   by cash and cash equivalents and equity
   dan ekuitas pemegang saham induk, yang terdiri                                                shareholders of the holding consisting of capital
   dari modal yang ditempatkan, tambahan modal                                                   stock, additional paid-in capital, retained earnings
   disetor, saldo laba dan kepentingan non-                                                      and non-controlling interests and deduct with
   pengendali dan dikurangi dengan modal saham                                                   treasury stock.
   diperoleh kembali.

  Dewan Direksi Grup secara berkala melakukan                                                    The Board of Directors of the Group periodically
  reviu struktur permodalan Grup. Sebagai bagian                                                 reviews the Group's capital structure. As part of
  dari reviu ini, Dewan Direksi mempertimbangkan                                                 this review, the Board of Directors considers the
  biaya permodalan dan risiko yang berhubungan.                                                  cost of capital and related risks.

  Gearing ratio pada tanggal 30 Juni 2026 dan 31                                                 The gearing ratio as of June 30, 2026 and
  Desember 2025 adalah sebagai berikut:                                                          December 31, 2025 are as follows:

                                                                    2026                                     2025
                                                                     Rp                                       Rp

   Pinjaman                                                       32.119.498.798                        29.929.021.175                                                     Debt
   Ekuitas                                                        (2.366.975.610)                        (884.711.247)                                                    Equity
   Gearing ratio                                                             -1357%                                   -3383%                                Gearing ratio

D. Pengukuran Nilai Wajar                                                                                           D. Fair Value Measurements
   Berikut hirarki nilai wajar aset keuangan yang                                                The following is the fair value hierarchy of
   diukur pada nilai wajar melalui laba rugi yang                                                financial assets measured at fair value through
   pada akhir tahun dicatat menggunakan nilai                                                    profit or loss which at the end of the year is
   wajar, yaitu:                                                                                 recorded using fair value, namely:


                                                                                       163

Page 173
PT WIJAYA KARYA (PERSERO) Tbk                                                  PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                            AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                         NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                     FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                         For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                  June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                                And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                               Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                             (In Thousand Rupiah, unless Otherwise Stated)
                                                                        Tingkat I/        Tingkat II/         Tingkat III/
                                                     2026                Level I           Level II            Level III
                                                      Rp                   Rp                 Rp                  Rp

   Aset Keuangan yang Diukur Dengan Laba dan Rugi/
   Financial Assets Through Profit and Loss
    Investasi Jangka Panjang Lainnya/
    Other Long Term Investments
      PT Jasamarga Balikpapan Samarinda               635.900.000                    --                  --       635.900.000
      PT Citra Marga Lintas Jabar                     243.000.000                    --                  --       243.000.000
      PT Bandara Internasional Batam                  119.000.000                    --                  --       119.000.000
      PT Trans Pacific Petrochemical Indotama           1.500.000                    --                  --         1.500.000
      PT Air Minum Indonesia                              140.000                    --                  --           140.000


                                                                        Tingkat I/         Tingkat II/        Tingkat III/
                                                     2025                Level I            Level II           Level III
                                                      Rp                   Rp                  Rp                 Rp

   Aset Keuangan yang Diukur Dengan Laba dan Rugi/
   Financial Assets Through Profit and Loss
    Investasi Jangka Panjang Lainnya/
    Other Long Term Investments
      PT Jasamarga Balikpapan Samarinda               635.900.000                    --                  --        635.900.000
      PT Citra Marga Lintas Jabar                     243.000.000                    --                  --        243.000.000
      PT Bandara Internasional Batam                  119.000.000                    --                  --        119.000.000
      PT Trans Pacific Petrochemical Indotama           1.500.000                    --                  --          1.500.000
      PT Air Minum Indonesia                              140.000                    --                  --            140.000


55. Kelangsungan Usaha                                                                               55. Going Concern

Laporan keuangan konsolidasian disusun dengan                     The consolidated financial statements had been
asumsi bahwa Grup akan melanjutkan operasi                        prepared with an assumption that the Group will
sebagai entitas yang berkemampuan untuk                           continue as a going concern. As of June 30, 2026,
mempertahankan kelangsungan usaha. Pada                           the Group incurred a net loss for the year ended
tanggal 30 Juni 2026, Grup telah mencatat rugi                    June 30, 2026 amounting to Rp1,553,559,226 and
komprehensif untuk tahun yang berakhir pada                       reported accumulated losses and a capital
tanggal 30 Juni 2026 sebesar Rp1.553.559.226,                     deficiency as of December 31, 2025 of
serta melaporkan saldo akumulasi kerugian dan                     Rp20,774,609,112      and     Rp19.292,344,749,
defisiensi modal pada tanggal 31 Desember 2025                    respectively.
masing-masing sebesar Rp20.774.609.112 dan
Rp19.292.344.749.

Beberapa rencana manajemen untuk meningkatkan                 Several management plans to increase revenue
pendapatan antara lain:                                       include:
 • Mendapatkan keringanan pembayaran pokok                    • Obtaining relief on principal and/or interest
    dan/atau bunga dalam rangka mengurangi                         payments to alleviate short- to medium-term
    tekanan kas jangka pendek – menengah;                          cash flow pressures;
 • Memperbaiki prosedur dan model operasi                     • Enhancing procedures and operating models to
    untuk memastikan adanya proses check and                       ensure adequate check and balance processes
    balance dalam setiap aktivitas;                                in all activities;
 • Percepatan penagihan atas piutang-piutang                  • Accelerating          the collection of overdue
    bermasalah;                                                    receivables;
 • Melakukan asset recycling atau divestasi atas              • Undertaking asset recycling or divestment of
    aset-aset non-core WIKA dalam rangka                           non-core assets to generate cash proceeds for
    mendapatkan dana tunai untuk penyelesaian                      WIKA debt settlement;
    utang WIKA;
 • Memperbaiki portfolio orderbook konstruksi                 •     Improving the construction order book portfolio
    dengan fokus pada proyek-proyek yang                            by focusing on projects with monthly progress
    memiliki pembayaran monthly progress dengan                     payments to reduce cash deficits and working
    tujuan untuk mengurangi defisit kas dan                         capital requirements;
    kebutuhan modal kerja;

                                                            164

Page 174
PT WIJAYA KARYA (PERSERO) Tbk                                              PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                        AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                     NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                 FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                      For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                               June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                             And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                            Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                          (In Thousand Rupiah, unless Otherwise Stated)
•    Penurunan beban usaha secara jangka                     •   Reducing operating expenses over the long
     panjang;                                                    term;
•    Restrukturisasi dan/atau penurunan pinjaman             •   Restructuring and/or reducing supply chain
     supply chain financing (SCF) yang merupakan                 financing (SCF) facilities, which represent short-
     dana talangan jangka pendek; dan                            term bridging funds; and
•    Penguatan struktur permodalan melalui rights            •   Strengthening the capital structure through a
     issue atau penerbitan saham baru melalui                    rights issue or issuance of new shares via pre-
     mekanisme HMETD.                                            emptive rights (HMETD).

Dalam rangka memperbaiki kondisi keuangan dan                In order to improve its financial condition and
menjaga kelangsungan usaha, Perseroan telah                  maintain business continuity, the Company has
menunjuk konsultan restrukturisasi independen,               appointed an independent restructuring consultant,
PT Perusahaan Pengelola Aset (PPA), untuk                    PT Perusahaan Pengelola Aset (PPA), to develop a
menyusun skema restrukturisasi menyeluruh.                   comprehensive restructuring scheme. The Company
Perseroan juga telah melakukan koordinasi dengan             has also coordinated with PT Danantara Asset
PT Danantara Asset Management (DAM) terkait                  Management (DAM) regarding its long-term
rencana restrukturisasi jangka panjang.                      restructuring plan.

Selain itu, untuk mendukung optimalisasi struktur            In addition, to support the optimization of its capital
permodalan, Perseroan merencanakan divestasi                 structure, the Company plans to divest certain non-
atas sejumlah aset non-core sebagai bagian dari              core assets as part of its strategy to improve cash
strategi perbaikan arus kas dan penguatan                    flows and strengthen liquidity.
likuiditas.

PT Danantara Asset Managemet (DAM) selaku                    PT Danantara Asset Management (DAM), as the
pemegang saham seri B terbanyak Perusahaan                   largest Series B shareholder of the Company,
dengan          Surat      Nomor        SR.040/DI-           through Letter No. SR.040/DI-DAM/MDONFS2/2026
DAM/MDONFS2/2026 tanggal 13 Maret 2026                       dated March 13, 2026 regarding Shareholder
perihal Arahan dan Dukungan Pemegang Saham                   Direction and Support for the Financial Restructuring
atas Rencana Restrukrisasi Keuangan PT Wijaya                Plan of PT Wijaya Karya (Persero) Tbk, has
Karya (Persero) Tbk telah memberikan dukungan                expressed its support for the Company’s recovery
atas upaya penyehatan Perusahaan yang                        efforts, which are carried out in a measured and
dilaksanakan terukur, transparan dan sejalan                 transparent manner and in line with good corporate
dengan prinsip tata kelola perusahaan yang baik              governance (GCG) principles, in order to restore
(Good Coorporate Governance) dalam rangka                    performance and maintain the going concern of the
pemulihan kinerja dan menjaga keberlangsungan                Company and the WIKA Group. Support in DAM’s
usaha (going concern) Perusahaan dan WIKA grup.              capacity, shall not be construed as a guarantee
Pemberian dukungan dalam kapasitas DAM tidak                 (borg/avalist), a funding commitment in the form of
dapat diartikan sebagai pemberian jaminan                    capital injection, loans, or any other form, nor as any
(borg/avalist), komitmen pendanaan baik dalam                other support that gives rise to financial or legal
bentuk penyertaan modal, pinjaman maupun bentuk              obligations,     unless    expressly     stipulated   in
lain, maupun bentuk dukungan lain yang                       accordance with applicable laws and regulations.
menimbulkan kewajiban finansial dan hukum,
kecuali secara tegas ditetapkan melalui mekanisme
dan ketentuan peraturan perundang-undangan yang
berlaku.

Manajemen     berkeyakinan   bahwa    kombinasi              Management believes that the combination of these
langkah-langkah restrukturisasi dan divestasi                restructuring and divestment measures will enhance
tersebut    akan    meningkatkan    kemampuan                the Company’s ability to meet its obligations and
Perusahaan dalam memenuhi kewajibannya serta                 support its going concern in the foreseeable future.
mendukung     keberlangsungan    usaha   (going
concern) di masa mendatang.




                                                           165

Page 175
PT WIJAYA KARYA (PERSERO) Tbk                                                   PT WIJAYA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                             AND SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                          NOTES TO CONSOLIDATED
KONSOLIDASIAN (Lanjutan)                                                      FINANCIAL STATEMENTS (Continued)
Untuk Tahun-tahun yang Berakhir pada Tanggal                                                           For the Years Ended
30 Juni 2026 dan 31 Desember 2025                                                    June 30, 2026 and December 31, 2025,
Serta untuk periode-periode 6 (enam) Bulan yang Berakhir                                  And for the 6 (six) Months Periods
pada tanggal 30 Juni 2026 dan 2025                                                                 Ended June 30, and 2025
(Dalam Ribuan Rupiah, kecuali Dinyatakan Lain)                               (In Thousand Rupiah, unless Otherwise Stated)
56. Informasi     Keuangan       Tambahan        (Tidak                  56. Supplementary Financial Information
    Diaudit)                                                                                         (Unaudited)

Informasi tambahan berikut yang disajikan dibawah            The following additional information presented below
ini merupakan informasi yang disyaratkan oleh                is informastion required by applicable regulation and
regulasi yang berlaku dan bukan/tidak merupakan              is not information required by Indonesian Accounting
informasi yang dipersyaratkan oleh Standar                   Standards.
Akuntansi Indonesia.

Kontribusi Pajak                                             Tax Contribution
Informasi keuangan tambahan menyajikan informasi             The supplementary financial presents information
terkait kontribusi Perusahaan dan Entitas Anak               related to the Company’s and Subsidiaries
kepada Pemerintah Indonesia sesuai dengan Surat              contribution to the Government of Indonesia as
Edaran Kementerian Badan Usaha Milik Negara                  required by the Circular Letter of Ministry of State-
Republik Indonesia No. S-32/DKU.MBU/08/2024,                 owned Enterprises of The Republic of Indonesia No.
dengan rincian sebagai berikut:                              S-32/DKU/MBU/08/2024, details as follows:
                                                             2026
                                                              Rp
 A. Pajak                                                                                                          Tax A.
    Pajak Penghasilan (PPh)                                 163.416.707                                    Income Tax
    Pajak Pertambahan Nilai (PPN) & Pajak                                                 Value Added Tax (VAT) & Tax
     Penjualan atas Barang Mewah (PPnBM)                    412.350.135            on Sales of Luxury Goods (PPnBM)
    Bea dan Cukai                                            10.430.586                            Custom and Excises
    Pajak Pemerintah Pusat Lainnya                           15.634.562                Other Central Government Taxes
    Pajak Bumi dan Bangunan (PBB)                               401.438                                   Property Tax
    Total Kontribusi Pajak (Total A)                        602.233.427               Total Tax Contribution (Total A)

 B. Penerimaan Negara Bukan Pajak (PNBP)                                              Non-Tax State Revenue (PNBP) B.
    PNBP Lainnya                                                 3.361.403                             Other (PNBP)
    Total Kontribusi PNBP (Total B)                              3.361.403          Total PNBP Contribution (Total B)
     Jumlah                                                 605.594.830                                           Total

57. Tanggung Jawab Manajemen atas Laporan                                      57. Management Responsibility to the
    Keuangan Konsolidasian                                                        Consolidated Financial Statements

Manajemen Perusahaan bertanggung jawab atas                  The Company’s Management is responsible for the
penyusunan    laporan  keuangan  konsolidasian               preparation of the consolidated financial statements
yang terbit dan diotorisasi oleh Direksi pada                which were issued dan authorized by Directors on
27 Agustus 2026.                                             August 27, 2026.




                                                           166

Page 176
PT WIJAYA KARYA (Persero) Tbk.
Head Office
WIKA TOWER
Jl. D.I. Panjaitan Kav. 9-10
Jakarta Timur. 13340
www.wika.co.id


File

File Open PDF
Source IDX
Size2.37 MB
Published28 Aug 2026
Pages176
Characters1,245,515
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 136 people and organisations named in the text · linked when the evidence is strong

linked org PT Danantara Asset p.13
linked person Apri Artoto · Komisaris Utama p.20
linked person Prof. Dr. Harris Arthur Hedar · Komisaris Independen p.20 ×6
linked person Prof. Ir. Suryo Hapsoro Tri Utomo · Komisaris Independen p.20 ×8
linked person Ir. I Ketut Pasek Senjaya Putra · Direktur Utama p.20 ×3
linked person Vera Kirana p.20
linked person Hananto Aji · Direktur Operasi p.20 ×6
linked person Ir. Sonny Setyadhy p.20
linked person Prof. Dr. Firdaus Ali · Komisaris p.20
linked person Agung Budi Waskito · Direktur Utama p.20 ×4
linked person Fafan Khoirul Fanani p.20
linked person Roy Yournalista SE · Anggota p.21
linked org Wijaya Karya Beton Tbk p.22 ×18
linked org PT Wijaya Karya Realty p.22 ×9
linked org Wijaya Karya Bangunan Gedung p.22 ×19
linked org PT Wijaya Karya Bitumen p.22 ×7
linked org Wijaya Karya Pracetak Gedung p.22 ×3
linked org PT Wijaya Karya Industri Energi p.22 ×5
linked org PT Kereta Api Indonesia (Persero) p.25 ×7
linked org Pemerintah RI p.62 ×3
linked org Bank Central Asia Tbk p.73 ×2
linked org Bank Mandiri (Persero) Tbk p.73 ×4
linked org Dana Pensiun p.149
possible org WIJAYA KARYA (PERSERO) TBK p.1 ×588
possible org Pemerintah Republik Indonesia p.13 ×3
possible org Negara Republik Indonesia p.14 ×3
possible org Bursa Efek Indonesia p.15
possible org Otoritas Jasa Keuangan p.16 ×4
possible person Suwarta · Komisaris p.20
possible person Ir. Adityawarman · Komisaris Independen p.20 ×9
possible person Dr. Mulyadi · Direktur Keuangan p.20 ×2
possible person Ir. Hadjar Seti Adji p.20 ×7
possible person Ir. Jarot Widyoko · Komisaris Utama p.20
possible person Rusmanto · Komisaris Independen p.20
possible person Sumadi · Direktur Keuangan p.20
possible person Sri Rahayu p.29 ×2
unresolved org PT Wijaya Karya Anak p.6
unresolved org Aryanto & Rekan p.6 ×2
unresolved org PT Wijaya p.7 ×10
unresolved org Karya (Persero) Tbk p.7 ×2
unresolved org Rekan Slamet Riyanto p.7
unresolved org Menteri Pekerjaan Umum p.13
unresolved person Djojo Muljadi p.13
unresolved org Public Company Muljadi p.13
unresolved person Kartini Muljadi p.13
unresolved org Menteri Kehakiman p.13
unresolved org Minister of Republik Indonesia p.13
unresolved org Menteri p.13 ×4
unresolved org Ministry of Law and Human p.13
unresolved org Government of the Republic of Indonesia p.14 ×2
unresolved org Pengawas Pasar Modal dan Lembaga p.14
unresolved org Bapepam-LK p.14 ×12
unresolved org Menteri Negara p.14
unresolved org Indonesia Stock Exchange p.15
unresolved org Financial Services Authority p.18 ×2
unresolved person Akt p.20
unresolved org Menteri Hukum dan Hak Asasi Manusia p.20
unresolved org Minister of Law and Human Rights p.20 ×5
unresolved person MBA p.21
unresolved person Rita Rufaida Ak · Anggota p.21 ×2
unresolved org PT Wijaya Karya Industri p.22 ×4
unresolved org Wijaya Karya Bangunan p.22 ×30
unresolved org PT Wijaya Karya Serang Panimbang p.22 ×3
unresolved org PT Wijaya Karya Tirta Jaya Jatiluhur p.22
unresolved org PT Balai Pustaka (Persero) p.22 ×3
unresolved org PT Wijaya Karya Realty KSO p.22
unresolved org Bank Indonesia p.22 ×3
unresolved org Bank Indonesia Provinsi Papua Barat p.22
unresolved org PT Wijaya Karya Komponen Beton p.22 ×3
unresolved org PT Wijaya Karya Krakatau Beton p.22 ×3
unresolved org PT Citra Lautan Teduh p.22 ×3
unresolved org PT Wijaya Karya Pracetak p.22 ×3
unresolved org PT Wege Solusi Proklamasi p.22 ×4
unresolved org PT Makassar Coastal City p.22 ×5
unresolved org PT Kurnia Realty Jaya p.22 ×3
unresolved org PT Senggigi Pratama Internasional p.22 ×3
unresolved org PT Indo Benhil Karunia Jaya p.22 ×3
unresolved org PT Wijaya Karya Aspal p.22 ×3
unresolved person Ir. Nanette Ir. Nanette Cahyanie Handari Adi Warsito p.23 ×3
unresolved org Menteri Hukum dan Hak Asasi p.23
unresolved person Fessy Farizqoh Alwi p.23 ×2
unresolved org PT Indonesia Natour p.23
unresolved person Ryan Bayu Candra · Notaris p.23 ×7
unresolved org Kementerian Hukum dan Hak Asasi Manusia p.24 ×2
unresolved org Ministry of Law and Human Rights Republik Indonesia p.24
unresolved person John Heri Azmi p.24
unresolved person Azmi p.24
unresolved org Ministry of Law and Human Republik p.24
unresolved org PT WIKA Tirta Jaya Jatiluhur p.24 ×2
unresolved person Notary Lia Amalia p.24 ×2
unresolved org PT Jaya Konstruksi Manggala p.24
unresolved org Pratama Tbk p.24
unresolved org PT Balai p.24 ×2
unresolved org PT Karya Realty p.25
unresolved org Karya Bangunan p.25 ×14
unresolved org PT Wahana Idea Cipta p.27
unresolved org PT Wahana p.27
unresolved org Karya Beton Tbk p.27 ×2
unresolved org Beton Tbk p.27
unresolved person Tjhong Sendrawan p.28
unresolved person Sendrawan p.28
unresolved org Minister of Law p.28 ×2
unresolved org Menteri Hukum dan Hak p.28
unresolved person Indrajati Tandjung p.28
unresolved person Tandjung p.28
unresolved org Menteri Kehakiman Republik Indonesia p.28 ×3
unresolved org Minister of Justice p.28 ×4
unresolved person Nurhayati Suryasumirat p.28
unresolved person Suryasumirat p.28
unresolved person Ismiyati p.28
unresolved person Sri Ismiyati p.28
unresolved person Notary Ryan Ryan Bayu-Siregar p.29 ×2
unresolved org Menteri Kehakiman Republik p.29
unresolved person Mala Mukti · Notaris p.29 ×3
unresolved org Mitsubishi Estate Mitsubishi Estate Co., Ltd. p.29
unresolved org Minister of Law Menteri Hukum Republik Indonesia p.29
unresolved person Karin Christiana Basoeki p.30
unresolved person Basoeki p.30
unresolved org Minister of Kehakiman dan Hak Asasi Manusia Republik p.30
unresolved org Pengawas Pasar Modal p.30
unresolved org Pengatur p.53 ×2
unresolved org PT Wijaya Karunia Realtindo p.68 ×2
unresolved org Bank Kuching p.73
unresolved org PT Datindo Entrycom p.141
unresolved org Pengaturan BUMN p.141
unresolved org Pengaturan BUMN Direksi p.141
unresolved person Notary Fathiah Helmi · Notaris p.142 ×9
unresolved org Kementerian Keuangan p.149
unresolved org Ministry of Finance p.149 ×2
unresolved org Ministry of Finance Kementerian Keuangan Pemerintah Republik p.149
unresolved org Dana Pensiun Wijaya Karya p.149
unresolved org Kementerian Badan Usaha Milik Negara p.175
unresolved org Ministry of State-Republik Indonesia No. S- p.175

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

Other files in this announcement 5

FinancialStatement-2026-II-WIKA.xlsx done
inlineXBRL.zip done
↑↓ select ↵ open ⇧↵ see every result