Back to announcement
20240423_ARCI_Laporan Informasi dan Fakta Material_31628968_lamp1.pdf
Other Text extracted ARCISource file signed link, expires in 15 minutes
Extracted text 3
Page 1 OCR 0.934
4 PT Archi Indonesia Tbk. Jakarta, 23 April 2024 Bapak Adi Pratomo Aryanto No 0035/ARCHI/4/2024/G Kepada/7o PT Bursa Efek Indonesia Gedung Bursa Efek Indonesia Jl. Jend. Sudirman Kav 52-53 Jakarta 12190 u.p/ attn..: Kepala Divisi PP1 Perihal/Re Reguest Dengan hormat, Sehubungan dengan surat PT Bursa Efek Indonesia (“BEI”) no S-03576/BEI.PP1/04- 2024 tertanggal 19 April 2024 perihal Permintaan Penjelasan Bursa yang telah diterima oleh PT Archi Indonesia Tbk. (“Perseroan”), dengan ini Perseroan menyampaikan tanggapan kepada BEI sebagai berikut: Pertanyaan 1: Jumlah pit yang terdampak oleh karena bencana banjir dan tanah longsor tersebut. Terdapat 1 (satu) pit yang dimiliki bersama oleh Entitas Anak Perseroan PT Meares Soputan Mining (“MSM”) dan PT Tambang Tondano Nusajaya (“TTN”) yang terdampak oleh karena bencana banjir dan tanah longsor. Pertanyaan 2: Jumlah pit yang dimiliki oleh Perseroan yang masih beroperasi. Perseroan melalui Entitas Anak total memiliki 4 (empat) pit. 3 (tiga) pit dalam tahap operasi produksi tidak terdampak bencana dan 1 (satu) pit terdampak bencana. Permintaan Penjelasan Bursa/ Exchange Explanation Dear Sir, In connection with Indonesia Stock Exchange (PT Bursa Efek Indonesia - IDX”) letter no S- 03576/BEI.PP1/04-2024 dated 19 April 2024 regarding Exchange Explanation Reguest which has been received by PT Archi Indonesia Tbk. (the “Company”, the Company hereby submit the response to IDX as follows: Guestion 1: The number of pits affected by the floods and landslides. There is 1 (one) pit owned together by the Company' subsidiaries, PT Meares Soputan Mining (“(MSM') and PT Tambang Tondano Nusajaya (“TTN') which was affected by the flood and landslide. Guestion 2: Number of pits owned by the Company that are still operating. The Company through subsidiaries has 4 (four) pits. 3 (three) pit in the production operation stage which are not impacted by the disaster and 1 (one) pit which is impacted by the disaster. Rajawali Place, 27" Floor Jl. H.R. Rasuna Said Kav. B/4 Kel. Setiabudi, Kec. Setiabudi, Jakarta Selatan, 12910 P:462 21 5761719
Page 2 OCR 0.939
h « PT Archi Indonesia Tbk. Pertanyaan 3: Persentase kontribusi pendapatan dari pit yang terdampak banjir tersebut terhadap total pendapatan Perseroan per 31 Desember 2023. Kontribusi pendapatan dari pit yang terdampak pada tahun 2023 kurang-lebih sebesar 40Y4. Pertanyaan 4: Target waktu pit tersebut dapat beroperasi kembali. Saat ini Perseroan sedang memperhitungkan semua aspek yang dapat berpengaruh terhadap remediasi atas pit terdampak bencana. Kompleksitas dari perhitungan tersebut karena Perseroan harus merevisi rencana pertambangan dan melakukan re- alokasi utilisasi alat berat pertambangan. Informasi secara detil akan disampaikan Perseroan pada saat Rapat Umum Pemegang Saham yang akan dilakukan paling lambat pada tanggal 28 Juni 2024. Pertanyaan 5: Perseroan menyatakan bahwa kejadian tersebut berpotensi menghambat arus kas Perseroan selama proses perbaikan, seberapa besar dampaknya terhadap arus kas Perseroan? Sebagaimana pertanyaan no. 4, informasi secara detil akan disampaikan Perseroan pada saat Rapat Umum Pemegang Saham yang akan dilakukan paling lambat pada tanggal 28 Juni 2024. Sebagai referensi awal, arus kas akan dipengaruhi langsung dengan jumlah produksi. Namun demikian, peningkatan harga emas 4/- 134 (tiga belas persen) (LBMA PM 2 Jan 2024 US$2,068 vs. LBMA PM 22 Apr 2024 US$2,335) memberikan dampak positif terhadap arus kas Perusahaan. Guestion 3: Percentage contribution of income from pits affected by the flood to the Company's total income as of 31 December 2023. In 2023 Revenue contribution from the affected pit was around 4046. Guestion 4: The target time for the pit to operating again. The Company is currently calculating all aspects which will affect the remediation on the affected pit due to disaster. Complexity of the calculation is mainly due to the Company has to revise the mining plan and reallocate the utilization of the mining heavy eguipment. Detail information will be conveyed by the Company at the General Shareholder Meeting which will be held by 28 June 2024 at the latest. Guestion 5: The Company states that this incident has the potential to hamper the Company's cash flow during the repair process. How big is the impact on the Company's cash flow? As per guestion no. 4, detail information will be conveyed by the Company at the General Shareholder Meeting which will be held by 28 June 2024 at the latest. As initial reference, cash flows is directly impacted by the production. However, increasing the gold price of 4/- 136 (thirteen percent) (LBMA PM 2 Jan 2024 US$2,068 vs. LBMA PM 22 Apr 2024 US$2,335) give positive impact to the Company cash flows. Rajawali Place, 27" Floor Jl. H.R. Rasuna Said Kav. B/4 Kel. Setiabudi, Kec. Setiabudi, Jakarta Selatan, 12910 P:462215761719
Page 3 OCR 0.936
h . PT Archi Indonesia Tbk. Pertanyaan 6: Fakta dan/atau informasi lainnya yang belum disampaikan kepada publik. Sampai dengan saat ini, Perseroan tidak memiliki informasi, fakta, atau kejadian penting lainnya yang belum diungkapkan kepada publik. Apabila terdapat informasi atau fakta material yang perlu diungkapkan kepada publik, Perseroan akan senantiasa mematuhi kewajiban penyampaian informasi terkait informasi atau fakta material sebagaimana diatur dalam Peraturan Otoritas Jasa Keuangan Nomor 31/POJK.04/2015 tentang Keterbukaan Informasi atau Fakta Material oleh Emiten atau Perusahaan Publik dan Peraturan I-E. Demikian kami sampaikan. Atas perhatiannya kami ucapkan terima kasih. Hormat Kami, PT Archi Indonesia Tbk. Guestion 6: Facts and/or other information that have not been disclosed to the public. As of now, The Company did not have any information, facts, or other important events that have not been disclosed to the public. If there is any information or material facts which reguire to be disclosed to the public, the Company will always comply with the obligation to fulfill information disclosure in relation to material information or facts as stipulated in the Financial Services Authority Regulation — Number 31/POJK.04/2015 concerning Disclosure of Material Information or Facts by Issuers or Public Companies and I-E Regulations. Accordingly this is conveyed. Thank you for your attention. Rajawali Place, 27" Floor Jl. H.R. Rasuna Said Kav. B/4 Kel. Setiabudi, Kec. Setiabudi, Jakarta Selatan, 12910 P:462 215761719
Names mentioned 8 people and organisations named in the text · linked when the evidence is strong
unresolved
person
Adi Pratomo Aryanto
p.1
unresolved
org
PT Meares Soputan Mining
p.1 ×2
unresolved
org
PT Tambang Tondano Nusajaya
p.1 ×2
unresolved
org
Indonesia Stock Exchange
p.1
unresolved
org
Financial Services Authority
p.3
Extraction attempts how the parser did, and what it refused
Nothing structured was extracted from this document — the attempts below say why.
No extraction attempted yet.