4 PT Archi Indonesia Tbk.

Jakarta, 23 April 2024

Bapak Adi Pratomo Aryanto

No 0035/ARCHI/4/2024/G
Kepada/7o PT Bursa Efek Indonesia

Gedung Bursa Efek Indonesia

Jl. Jend. Sudirman Kav 52-53

Jakarta 12190

u.p/ attn..:

Kepala Divisi PP1

Perihal/Re

Reguest

Dengan hormat,

Sehubungan dengan surat PT Bursa Efek
Indonesia (“BEI”) no S-03576/BEI.PP1/04-
2024 tertanggal 19 April 2024 perihal
Permintaan Penjelasan Bursa yang telah
diterima oleh PT Archi Indonesia Tbk.
(“Perseroan”), dengan ini Perseroan
menyampaikan tanggapan kepada BEI
sebagai berikut:

Pertanyaan 1:

Jumlah pit yang terdampak oleh karena
bencana banjir dan tanah longsor
tersebut.

Terdapat 1 (satu) pit yang dimiliki bersama
oleh Entitas Anak Perseroan PT Meares
Soputan Mining (“MSM”) dan PT Tambang
Tondano Nusajaya (“TTN”) yang terdampak
oleh karena bencana banjir dan tanah
longsor.

Pertanyaan 2:
Jumlah pit yang dimiliki oleh Perseroan
yang masih beroperasi.

Perseroan melalui Entitas Anak total memiliki
4 (empat) pit. 3 (tiga) pit dalam tahap operasi
produksi tidak terdampak bencana dan 1
(satu) pit terdampak bencana.

Permintaan Penjelasan Bursa/ Exchange Explanation

Dear Sir,

In connection with Indonesia Stock Exchange
(PT Bursa Efek Indonesia - IDX”) letter no S-
03576/BEI.PP1/04-2024 dated 19 April 2024
regarding Exchange Explanation Reguest
which has been received by PT Archi
Indonesia Tbk. (the “Company”, the
Company hereby submit the response to IDX
as follows:

Guestion 1:
The number of pits affected by the floods
and landslides.

There is 1 (one) pit owned together by the
Company' subsidiaries, PT Meares Soputan
Mining (“(MSM') and PT Tambang Tondano
Nusajaya (“TTN') which was affected by the
flood and landslide.

Guestion 2:
Number of pits owned by the Company
that are still operating.

The Company through subsidiaries has 4
(four) pits. 3 (three) pit in the production
operation stage which are not impacted by
the disaster and 1 (one) pit which is impacted
by the disaster.

Rajawali Place, 27" Floor
Jl. H.R. Rasuna Said Kav. B/4
Kel. Setiabudi, Kec. Setiabudi, Jakarta Selatan, 12910
P:462 21 5761719
Page 2 OCR 0.939
h « PT Archi Indonesia Tbk.

Pertanyaan 3:

Persentase kontribusi pendapatan dari pit
yang terdampak banjir tersebut terhadap
total pendapatan Perseroan per 31
Desember 2023.

Kontribusi pendapatan dari pit yang
terdampak pada tahun 2023 kurang-lebih
sebesar 40Y4.

Pertanyaan 4:
Target waktu pit tersebut dapat beroperasi
kembali.

Saat ini Perseroan sedang memperhitungkan
semua aspek yang dapat berpengaruh
terhadap remediasi atas pit terdampak
bencana. Kompleksitas dari perhitungan
tersebut karena Perseroan harus merevisi
rencana pertambangan dan melakukan re-
alokasi utilisasi alat berat pertambangan.

Informasi secara detil akan disampaikan
Perseroan pada saat Rapat Umum
Pemegang Saham yang akan dilakukan
paling lambat pada tanggal 28 Juni 2024.

Pertanyaan 5:

Perseroan menyatakan bahwa kejadian
tersebut berpotensi menghambat arus kas
Perseroan selama proses perbaikan,
seberapa besar dampaknya terhadap arus
kas Perseroan?

Sebagaimana pertanyaan no. 4, informasi
secara detil akan disampaikan Perseroan
pada saat Rapat Umum Pemegang Saham
yang akan dilakukan paling lambat pada
tanggal 28 Juni 2024.

Sebagai referensi awal, arus kas akan
dipengaruhi langsung dengan jumlah
produksi. Namun demikian, peningkatan
harga emas 4/- 134 (tiga belas persen)
(LBMA PM 2 Jan 2024 US$2,068 vs. LBMA
PM 22 Apr 2024 US$2,335) memberikan
dampak positif terhadap arus kas
Perusahaan.

Guestion 3:

Percentage contribution of income from
pits affected by the flood to the Company's
total income as of 31 December 2023.

In 2023 Revenue contribution from the
affected pit was around 4046.

Guestion 4:
The target time for the pit to operating
again.

The Company is currently calculating all
aspects which will affect the remediation on
the affected pit due to disaster. Complexity of
the calculation is mainly due to the Company
has to revise the mining plan and reallocate
the utilization of the mining heavy eguipment.

Detail information will be conveyed by the
Company at the General Shareholder Meeting
which will be held by 28 June 2024 at the
latest.

Guestion 5:

The Company states that this incident has
the potential to hamper the Company's
cash flow during the repair process. How
big is the impact on the Company's cash
flow?

As per guestion no. 4, detail information will
be conveyed by the Company at the General
Shareholder Meeting which will be held by 28
June 2024 at the latest.

As initial reference, cash flows is directly
impacted by the production. However,
increasing the gold price of 4/- 136 (thirteen
percent) (LBMA PM 2 Jan 2024 US$2,068 vs.
LBMA PM 22 Apr 2024 US$2,335) give
positive impact to the Company cash flows.

Rajawali Place, 27" Floor
Jl. H.R. Rasuna Said Kav. B/4
Kel. Setiabudi, Kec. Setiabudi, Jakarta Selatan, 12910
P:462215761719
Page 3 OCR 0.936
h . PT Archi Indonesia Tbk.

Pertanyaan 6:
Fakta dan/atau informasi lainnya yang
belum disampaikan kepada publik.

Sampai dengan saat ini, Perseroan tidak
memiliki informasi, fakta, atau kejadian
penting lainnya yang belum diungkapkan
kepada publik.

Apabila terdapat informasi atau fakta material
yang perlu diungkapkan kepada publik,
Perseroan akan senantiasa mematuhi
kewajiban penyampaian informasi terkait
informasi atau fakta material sebagaimana
diatur dalam Peraturan Otoritas Jasa
Keuangan Nomor 31/POJK.04/2015 tentang
Keterbukaan Informasi atau Fakta Material
oleh Emiten atau Perusahaan Publik dan
Peraturan I-E.

Demikian kami sampaikan. Atas perhatiannya
kami ucapkan terima kasih.

Hormat Kami,
PT Archi Indonesia Tbk.

Guestion 6:
Facts and/or other information that have
not been disclosed to the public.

As of now, The Company did not have any
information, facts, or other important events
that have not been disclosed to the public.

If there is any information or material facts
which reguire to be disclosed to the public, the
Company will always comply with the
obligation to fulfill information disclosure in
relation to material information or facts as
stipulated in the Financial Services Authority
Regulation — Number 31/POJK.04/2015
concerning Disclosure of Material Information
or Facts by Issuers or Public Companies and
I-E Regulations.

Accordingly this is conveyed. Thank you for
your attention.

Rajawali Place, 27" Floor
Jl. H.R. Rasuna Said Kav. B/4
Kel. Setiabudi, Kec. Setiabudi, Jakarta Selatan, 12910
P:462 215761719

File

File Open PDF
Source IDX
Size0.18 MB
Published23 Apr 2024
Pages3
Characters6,459
Text sourceOCR
OCR confidence0.936

Names mentioned 8 people and organisations named in the text · linked when the evidence is strong

linked org Archi Indonesia Tbk. p.1 ×17
possible org PT Bursa Efek Indonesia p.1 ×4
possible org Otoritas Jasa Keuangan p.3
unresolved person Adi Pratomo Aryanto p.1
unresolved org PT Meares Soputan Mining p.1 ×2
unresolved org PT Tambang Tondano Nusajaya p.1 ×2
unresolved org Indonesia Stock Exchange p.1
unresolved org Financial Services Authority p.3

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

Other files in this announcement 1

↑↓ select ↵ open ⇧↵ see every result