Back to announcement
20240326_KKGI_Laporan Informasi dan Fakta Material_31619850_lamp2.pdf
Other Text extracted KKGISource file signed link, expires in 15 minutes
Extracted text 38
Page 1 OCR 0.947
PT Resource Alam Indonesia Tbk Code : KKGI 25 March 2024 www.raintbk.com
Page 2 OCR 0.935
Disclaimer RAIN GROUP These materials have been prepared by PT Resource Alam Indonesia Tbk (the “ and have not been independently verified No representation or warranty, expressed or implied, is made and no reliance should be placed on the accuracy, fairness or completeness of the information presented or contained in these materials. The Company or any of its affiliates, advisers or representatives accepts no liability whatsoever for any loss howsoever arising from any information presented or contained in these materials The information presented or contained in these materials is subject to change without notice and its accuracy is not guaranteed. These materials contain statements that constitute forward looking statements These statements include descriptions regarding the intent, belief or current expectations of the Company or its officers with respect to the consolidated results of operations and financial condition of the Company These statements can be recognized by the use of words such as " expects,”" plan,”" will,”“ estimates,”” projects,”“ or words of similar meaning Such forward looking statements are not guarantees of future performance and involve risks and uncertainties, and actual results may differ from those in the forward looking statements as a result of various factors and assumptions The Company has no obligation and does not undertake to revise forward looking statements to reflect future events or circumstances. nu "au nu These materials are for information purposes only and do not constitute or form part of an offer, solicitation or invitation of any offer to buy or subscribe for any securities of the Company, in any jurisdiction, nor should it or any part of it form the basis of, or be relied upon in any connection with, any contract, commitment or investment decision whatsoever Any decision to purchase or subscribe for any securities of the Company should be made after seeking appropriate professional advice. PT Resource Alam Indonesia Tbk Public Expose 2024 www.raintbk.com
Page 3 OCR 0.883
Three Business Pillars “g Aa MINING Coal Thermal coal mining & RAIN GROUP & RENEWABLE ENERGY organic exploration Minerals Environmentally Conscious Mineral Mining Through Innovative Technology. PROPERTY Ka Water-based 2A& Renewable Energy Property Development Clean energy generation based on water & mini hydro. Developing high-guality real estate projects that are environmentally S-— Solar-based ? friendly and contribute positively to Renewable Energy the surrounding community. Floating (PV Floating) & land-based power plants“. “In the Pre-FS stage Contractors Expanding capacity and refining operational processes to optimize business performance PT Resource Alam Indonesia Tbk Public Expose 2024 www.raintbk.com
Page 4 OCR 0.916
Company Overview RAIN GROUP PT Resource Alam Indonesia Tbk (IDX: KKGI) is a holding company with subsidiary of coal mining located at some sites in Indonesia and mini hydro power plant, as follows: : PT INSANI BARAPERKASA 9 Tete) « PKP2B Generation III, East Kalimantan, Concession area of 24,477.6 Ha. Production Phase. Total Resources 565.66 million MT and Total Reserves 146.17 million MT. PT LOA HAUR e IUP of Operation Production, Central Kalimantan, Concession Area 5.000 Ha. Loa Haur Proven Reserves #12 million MT, CV 4650-6191 (GAR). PT KHATULISTIWA HIDRO ENERGI « 994 owned by PT Bias Petrasia Persada : signed PPA with PT PLN of 6,4 MW capacity Emang at Cicatih, West Jawa and has been fully operating since Oktober 2019. PKP2B - Coal Contract Of Work IUP - Mining Business License PT Resource Alam Indonesia Tbk Public Expose 2024 www.raintbk.com
Page 5 OCR 0.867
Corporate Structure: December 31, 2023 RAIN GROUP 26,7276 PT SEJAHTERA JAYA CITA 35,634 5,006 MSIP S/A ENERGY LX INTERNATIONAL COLLIER PRIVATE (SINGAPORE) PTE, LTD BUY BACK LIMITED 6,64” 26,0146 PUBLIC PT RESOURCE ALAM INDONESIA Tbk (KKGI) 99,96 75,04 906 60,074 PT INSANI BARA PT KALTIM Other Subsidiary PT LOA HAUR PERKASA MINERAL 43,046 PT KHATULISTIWA HIDRO ENERGI PT Resource Alam Indonesia Tbk Public Expose 2024 www.raintbk.com
Page 6 OCR 0.945
Mine Location Map : PT Insani Baraperkasa RAIN GROUP NORTH SEPARI BLOCK 7,019 Ha PERANGAT BLOCK 2,919 Ha MAUKIRI BLOCK 2,147 Ha SOUTH GN. PINANG BLOCK 994.50 Ha BAYUR BLOCK 596.60 Ha LOA JANAN BLOCK 10,040 Ha TANI BAKTI BLOCK 379.40 Ha SIMPANG PASIR BLOCK| 430.10 Ha TOTAL AREA | 24,477.6 Ha PT Resource Alam Indonesia Tbk www.raintbk.com Public Expose 2024
Page 7 OCR 0.920
Mine Concession - PT Insani Baraperkasa RAIN GROUP e# PT. Insani Baraperkasa, as the concession holder for coal mining, has been in the production phase and holds the Generation III PKP2B since 2006. The mining activities are conducted in the Simpang Pasir and Tani Bhakti blocks. « In 2008, the entire PKP2B area of PT Insani Baraperkasa received approval for the Production stage from the Minister of Energy and Mineral Resources. # The total concession area spans 24,477.6 hectares, with approximately 2,270 hectares already mined up to the present day. e The concession period extends until 2036, which is 30 years from the issuance of the production permit in 2006. Renewal options include two additional periods of 10 years each. e The mining location is strategically positioned within an average distance of 14 to 21 kilometers, resulting in low hauling costs. e The primary mining contractors are PT Bukit Makmur Mandiri Utama (BUMA), PT Ansaf Inti Resources, and PT Arta Bumi Sakti (ABS). PT Resource Alam Indonesia Tbk Public Expose 2024 www.raintbk.com
Page 8 OCR 0.907
RAIN GROUP Infrastructure Capacity 2023 Maximum Stockpile Crusher Capacity Storage Capacity Port/Jetty (tph) Raw (Ton) Crushed (Ton) 40,000 10,000 Sungai Berlian Jaya - 2 40,000 5,000 Sungai Berlian Jaya -1 270 3 Sungai Berlian Jaya - 3 50,000 300,000 Embalut 300 s0 |. PT Resource Alam Indonesia Tbk Public Expose 2024 www.raintbk.com 15,000
Page 9 OCR 0.908
Production Volume 2019 - 2023 RAIN GROUP 6000 e Coal production in 2023 reached 5.337 5000 Million Tons. # This increase was attributed to precise 4000 mining plans, well-developed infrastructure, and a skilled workforce. 3000 2000 1000 lo) 2019 2020 2021 2022 2023 “In million tons PT Resource Alam Indonesia Tbk Public Expose 2024 www.raintbk.com
Page 10 OCR 0.907
Sales Volume 2019 - 2023 RAIN GROUP 6000 5000 4000 3000 e Coal sales in 2023 amounted to 5.239 million tons. 2000 e The surge in sales was facilitated by diversifying coal export destinations An in line with the increasing demand in the international market. lo) 2019 2020 2021 2022 2023 “in million tons PT Resource Alam Indonesia Tbk Public Expose 2024 www.raintbk.com
Page 11 OCR 0.926
Export/Domestic Destination States 2023 RAIN GROUP 29.696 29.296 “In million tons PT Resource Alam Indonesia Tbk Public Expose 2024
Page 12 OCR 0.818
Cash Cost (USD/Ton) RAIN GROUP 40.00 36.02 Hi # In2023, the cash cost notably decreased to US$ 34.65 compared to 2022, due to the decrease in the Stripping Ratio. 20.00 17.66 17.93 « This reduction in cash cost was attributed to the effective and efficient 10.00 execution of mining operations. 0.00 PYSL4 PYASIEY T63 Eye BTS EYTOEY20) FY 211EY23"EY22 Cash cost includes royalties PT Resource Alam Indonesia Tbk Public Expose 2024 www.raintbk.com
Page 13 OCR 0.829
Average Selling Price (USS/MT) FOB MV 100.00 82.52 « The average coal selling price in 2023 declined due to the global decrease in coal prices. 80.00 60.00 e This was driven by heightened domestic coal production in India and China, the world's largest coal producers and consumers, averting the 20.00 33.40 sharp increase observed in 2022. 40.00 0.00 FYSL4 PY1SIEY T63ES173 PTS EYTOEY20) FY 21 EY227 R23 me RAIN GROUP PT Resource Alam Indonesia Tbk Public Expose 2024 www.raintbk.com
Page 14 OCR 0.632
Coal Price Trend RAIN GROUP January - December 2023 MM 1ci4-4200 BEE ICE Newcastle 250 200 150 100 0 Ig SA SS SS wa £ 3 & S£ £ £ TI S & r DV y PS S S £ O & g N & S & 8 3 « r Oo S & S S 9 Indonesia Coal Index 4 VS Ice Newcastle PT Resource Alam Indonesia Tbk Public Expose 2024 www.raintbk.com
Page 15 OCR 0.927
Profit Loss Statement Revenue 15.454 Gross Profit Operating Profit -36.644 Net Profit After Tax RAIN GROUP PT Resource Alam Indonesia Tbk Public Expose 2024 www.raintbk.com
Page 16 OCR 0.872
Financial Ratio Gross Margin 17.914 28.894 12.976 23.644 Operational Margin Net Profit Margin ROA (Annually) 13.374 ROE (Annually) 19.244 Debt to Eguity 49 RAIN GROUP PT Resource Alam Indonesia Tbk www.raintbk.com Public Expose 2024
Page 17 OCR 0.945
Efforts Aimed At Enhancing Future Performance — PT Resource Alam Indonesia Tbk, via PT Insani Baraperkasa and PT Loa Haur, aims to boost coal production and sales by 6.67 million tons in 2024. PT Insani Baraperkasa targets 5.92 million tons, while PT Loa Haur aims for 0.75 million tons, aligning with market conditions and demand. PT Resource Alam Indonesia Tbk Public Expose 2024 www.raintbk.com
Page 18 OCR 0.913
Efforts Aimed At Enhancing Future Performance Noa Haur e In 2023, PT Loa Haur established a 3-hectare stockpile area and expanded the hauling road at KM 11-14. e Drilling activities were carried out throughout the year to update resource and reserve data. # These findings are currently awaiting verification by the Competent Person Indonesia (CPI). PT Resource Alam Indonesia Tbk Public Expose 2024 www.raintbk.com
Page 19 OCR 0.883
me RAIN GROUP Future Focus SABAH PT Resource Alam Indonesia Tbk, through its subsidiary PT Resource Alam Energi (RAE), is actively engaged in exploration and feasibility studies to expand its RA Operations into the Silica Sand minerals sector across multiple Mining Business KALIMANTAN License Areas (WIUP). : 'Brunei, EAST i Bengkayang MOU GE pa These areas include: KALIMANTAN 1.A WIUP site in Bengkayang Regency, West Kalimantan. 2. Exploration activities in Tola Village, West Kalimantan. Para: 3.A WIUP site in Kutai Kartanegara Regency, Kalimatan East. WEST SOUTH KALIMANTAN PT Resource Alam Indonesia Tbk Public Expose 2024 www.raintbk.com
Page 20 OCR 0.932
RAIN GROUP Future Focus » PT Resource Alam Indonesia Tbk will collaborate with Bumi Global Energi (BGE) and PT Nusa Konstruksi Enjiniring Tbk (NKE) to establish a consortium for the PLTA Lematang 1 project in Lahat, South Sumatra. PLTA Lematang 1 is projected to generate approximately 41.78 MW of electricity. # PT Resource Alam Indonesia Tbk will additionally establish with Sumber Raya Energi (SRE) to collaborate on the PLTM Lematang 2 project in Lahat, South Sumatra. The project is anticipated to have a production capacity of 8.6 MW. # Both projects have successfully passed the pregualification stage of the Selected Provider List and are now prepared to participate in the PLN tender process. PT Resource Alam Indonesia Tbk Public Expose 2024 www.raintbk.com
Page 21 OCR 0.913
Future Focus » PT Resource Alam Indonesia Tbk is expanding its business into the property sector with plans to develop a residential project on approximately 10 hectares of land located in Handil Bakti, Palaran District, Samarinda City, East Kalimantan Province. » The development process will commence with permitting procedures scheduled to begin in the second guarter of 2024. # Currently, the company possesses an extensive land bank exceeding 3,000 hectares in Samarinda and Kutai Kartanegara. me RAIN GROUP PT Resource Alam Indonesia Tbk www.raintbk.com Public Expose 2024
Page 22 OCR 0.625
Latest Company Updates Shareholders of KKGI 8000 7,579 7,805 6,174 6,173 , , 5,910 5,791 6,914 6000 Dita 5.704 6,405 6,045 5,935 6,026 5,938 5,427 5,486 4000 2,592 2,630 Pa 2,402 0 Ii — — id — 2 —d — I—t—b -—— bo ——-—- “4 #—mx — ———— — Va Aa ah ah an ak an ah ah nh in hn in ak ha an ik hg ag ar ad PA & NS VX ak AA PRA “4 ST aP at KO pt Pa PONY CPO PPL EN NELSIr« According to KSEI data, during January 2022 - February 2024 share investor of KKGI recorded amount of 7,805. Increased 201.124 from the early year 2022. PT Resource Alam Indonesia Tbk Public Expose 2024 www.raintbk.com
Page 23 OCR 0.810
Awards Throughout the year 2023, PT Insani Baraperkasa has received the following awards : Occupational Health and Safety Governance Award (K3 Awards) Year 2023, Ministry of Manpower (Kemenaker) » HIV & AIDS Prevention and Control Program Award in the Workplace with PLATINUM Category e COVID-19 Prevention and Control Program Award in the Workplace with PLATINUM Category e Zero Accident Award Achievement in implementing Occupational Health and Safety (K3) Program, achieving 24,346,585 Work Hours without Work Accidents from December 1, 2016, to December 31, 2022. MENTERI KETENAGAKERJAAN REPUBLAK INDONESIA Piagam Penghargaan Dengan ii Mentari Ketenagaheran Reputik Indonesie Memberi Penghargaan Kepada PT INSANI BARAPERKASA Kalimantan Timur Sebagai Perusahaan Peneriina Penghargaan Program Pencegahan dan Penangyalangan (NVU-I9 di Tempat Kerja dengan kategori PLATINUM MENTERI KETENAGAKERJAAN REPUBLIK INDONESIA Pa SRS 2 NAABNN AI ANN TETAAN PT'INSANI BARAPERKASA Kalimantan Timur Sebagai Perusahaan Penerima Pengbaryaun Program Pencegahan dan Penanggulangan MIVAAS di Tempat erja dengan kategori PLATINUM PT Resource Alam Indonesia Tbk www.raintbk.com Public Expose 2024
Page 24 OCR 0.929
Awards PROPER Regional Award 2023 Environmental Management Period 2022 - 2023 (National Company Performance Rating Assessment Program) Environmental Management Award from the Provincial Environmental Agency, Ministry of Environment and Forestry (LHK), through the PROPER (Company Performance Rating System in Environmental Management) award for East Kalimantan Province Period 2022-2023 with a BLUE ranking. Award for Achievement in Successful Implementation of Good Mineral and Coal Mining Practices (Good Mining Practices - GMP - Award) / Minerba Award Year 2023, Ministry of Energy and Mineral Resources (ESDM). Award for the group of Business Entities holding Coal Mining Work Agreement Contracts in 2023. £4 GUBERNUR KALIMANTAN TIMUR Dikira Kesla PTINSANI BARA PERKASA Peringkat BIRU PROGRAM PENILAIAN PERINGKAT KINERJA PERUSAHAAN DALAM PENGELOLAAN LINGKUNGAN HIDUP PERIODE 2022 - 2023 Samarinda, 0S Juni 2023 Dr. Ir. H. Isran Noor, NSi PT Resource Alam Indonesia Tbk www.raintbk.com Public Expose 2024
Page 25 OCR 0.941
Awards Certificate of PRATAMA Excellence Award for the Category of Mineral and Coal Mining Safety Management Aspect. Certificate of UTAMA Award for the Mining Service Companies Group of PT BUMA Site PT Insani Baraperkasa. Category : Standardization Management and Mineral and Coal Mining Service Business Efforts. Certificate of Excellence PRATAMA Award for the Mining Service Companies Group of PT Ansaf Inti Resources Site PT Insani Baraperkasa. Category : Standardization Management and Mineral and Coal Mining Service Business Efforts. p— 7 t 3 KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA PIAGAM PENGHARGAAN Menteri Energi dan Sumber Daya Mineral dengan rasa hormat memberikan: PENGHARGAAN PRATAMA kepada PT ANSAF INTI RESOURCES SITE PT INSANI BARAPERKASA atas prestasinya dalam Pengelolaan Standardisasi dan Usaha Jasa Pertambangan Mineral dan Batubara untuk Kelompok Pemegang Izin Usaha Jasa Pertambangan Periode Penilaian Tahun 2022 Jakarta, 29 September 2023 a.n. MENTERI ENERGI DAN SUMBER DAYA MINERAL D PT Resource Alam Indonesia Tbk www.raintbk.com Public Expose 2024
Page 26 OCR 0.884
Awards NV/ » AV Governance Award for Community Development and Empowerment (PPM) in Kutai BUPATI KUTAN BENANAA Kartanegara Regency, with the theme: | Piagam Penghargaan Kepala e Community Development and Empowerment Program in Kutai Kartanegara Regency e Scholarship Program for Outstanding Students of Kutai Kartanegara SUBROTO AWARD 2023 Innovation Program for Nursery Development, Provision, and Management Facilities 59th National Health Day (HKN) Award in 2023. PT Insani Baraperkasa as a Private Company with High Commitment to Health in Kutai Kartanegara Regency, November 12, 2023 PROPER National Environmental Award 2023, Environmental Management Performance for the Period 2022 - 2023, KLHK RI (National Company Performance Rating Assessment Program) PT INSANI BARA PERKASA “ATAS PARTISIPASINYA DALAM PROGRAM PENGEMBANGAN DAN PEMBERDAYAAN MASYAKAKAT TAHUN 2022 DI KABUPATEN KUTAI KARTANEGARA LV Z8 BUPATI KUTAI KARTANEGARA Mantorikan Piagam Penghargaan PT Resource Alam Indonesia Tbk www.raintbk.com Public Expose 2024
Page 27 OCR 0.912
Awards CSR Award IV & LKPM Award 2023 Kutai Kartanegara with the theme of Synergy of CSR Building an Innovative, Competitive, and Independent Kutai Kartanegara. For CSR Award IV: e Mawar 15 Posyandu Program - Manunggal Jaya Hamlet, Award in the Societies Category of the Mining Business Sector with the Gold Predicate. # Mini Swargo Tani Agrotourism Program - Tani Bhakti Village, Award in the Economic Category of the Mining Business Sector with the Gold Predicate. e Certificate of Appreciation to PT Insani Baraperkasa as a Participant in the CSR Award 2023 Memberikan PIAGAM PENGHARGAAN PT. INSANI BARA PERKASA (Kodery yuri Perusahaan Swasta Dengan Komitmen Tinggi Terhadap Bidang Kesehatan Tenggarong, 12 November 2023 “BUPATI KUTAI LA ag Drs, EDI DAMANSYAH, M.Si PT Resource Alam Indonesia Tbk Public Expose 2024 www.raintbk.com
Page 28 OCR 0.901
Awards Meanmhile, the LKPM Award 2023: PT Insani Baraperkasa received the award for the Top 1 category of Domestic Investment. e LKPM AWARD 2023: Award for the Top 1 category of Domestic Investment # KUKAR CSR AWARD 2023: Gold Predicative Award in the Economic Category for Mining Business # KUKAR CSR AWARD 2023: Gold Predicative Award in the Societies Category for Mining Business PENANAMAN MODAL DALAM NEGERI (Bf | STM! DIBERIKAN KEPADA PT. INSANI BARA PERKASA BUPATI KUTAI KARTANEGARA me RAIN GROUP KUKAR 4 CSR AWARD 2023 PT Resource Alam Indonesia Tbk www.raintbk.com Public Expose 2024
Page 29 OCR 0.666
Awards ne YAN AWEYEYAWALYANANA Fun KAA a d AJARKAN YEYEYEU YAN AAN YAN NN L AS AAS AS SOY NYA YG KO 4 EPSON NAN NNPANN e Award from the Regent of Kutai Kartanegara for the Community Development and Empowerment Program in 2022 in Kutai Kartanegara Regency e Award from the Regent of Kutai Kartanegara for the Scholarship Financing Program for Outstanding Students of Kutai Kartanegara — RAIN GROUP
Page 30 OCR 0.943
Awards RAIN GROUP Certificate of Participation in the Activities and Development of Batuah Village Certificate of Appreciation for Village Development Through CSR Programs for w Tani Bhakti Village PIAGAM PENGHARGAAN Certificate of Appreciation for Participation in Community Development Programs in Kutai Kartanegara Regency Certificate of Appreciation for Contribution and Concern in the Field of Education in Kutai Kartanegara Regency Award for the Food for Greening Program by the East Kalimantan Governor | PT. INSANI BARAPERKASA PT Resource Alam Indonesia Tbk Public Expose 2024 www.raintbk.com
Page 31 OCR 0.882
RAIN GROUP Community Empowerment Program (PPM) REAL INCOME LEVEL or EMPLOYMENT # Melon Cultivation. e Expansion of Agrotourism Roads. ECONOMIC SELF-RELIANCE » Development of Agrotourism in Tani Bhakti Village. # Construction of Green House. e Cattle Fattening. SOCIAL-CULTURAL e Distribution of Eid al-Fitr gifts at government institutions. # Ourban Animal Assistance. » Cement Material Assistance for the HKBP Church in Tani Bhakti Village es Assistance in Making Concrete for the Baiturahim Mosgue in Tani Bhakti Village e Soccer Tournament e Anniversary of Tani Bhakti Village PT Resource Alam Indonesia Tbk Public Expose 2024 www.raintbk.com
Page 32 OCR 0.895
me RAIN GROUP Community Empowerment Program (PPM) INSTITUTIONAL PROGRAM e# Assistance in Communication Eguipment (HT) to Samarinda Police Resort. ENVIRONMENTAL MANAGEMENT # Normalizing Activities of a Tributary Stream along 2.5 KM. e Community Clean-up & Procurement of Weed Killer. e Distribution of Plant Seeds Lai. HEALTH # Construction of Bore Wells for Mosgue Congregants and Surrounding Residents in Handil Bhakti # Construction of Bore Wells for Residents of RT 02 in Dusun Tani Maju and Surrounding Areas » Procurement of Greenhouses & Playgrounds » Social Service Health Check-up Activities in Tani Bhakti Village PT Resource Alam Indonesia Tbk Public Expose 2024 www.raintbk.com
Page 33 OCR 0.917
me RAIN GROUP Community Empowerment Program (PPM) EDUCATION # Provision of School Facilities and Infrastructure Eguipment to 471 Students of SDN in Tani Bhakti and Bukit Pariaman Villages e Mentoring for Bhakti Jaya Football Club (SSB) # Assistance in Infrastructure and Eguipment for Early Childhood Education/Kindergarten (PAUD/TK) at Insani Cendikia « Training on Amino Acid Production with Bhakti Jaya Youth Organization in Tani Bhakti Village Training on ZPT Fertilizer Production - State Polytechnic of Agriculture Samarinda Material Assistance for SDN 014 Bukit Pariaman Scholarships for Wikrama Vocational High School (SMK) Support for Indonesia's Independence Day Celebration in Suka Damai Village « Transportation Assistance for Students in Batuah Village PT Resource Alam Indonesia Tbk Public Expose 2024 www.raintbk.com
Page 34 OCR 0.899
me RAIN GROUP Community Empowerment Program (PPM) INFRASTRUCTURE e# Installation of Baja Nusantara Football Field Lights « Construction of Riverside Road Embankment at RT 06 « Road Hardening at Berambai « Cementing of Manunggal Jaya Volleyball Field « Construction of Polindes Embankment at Karya Bhakti Village « Construction of Prayer Place at the Muslim Cemetery in the Village « Cementing of Manunggal Jaya Road Crossing in Tank Bhakti Village # Ditch Construction on RT 02 Road in Tani Bhakti Village « Road Widening in Tani Bakti Village « Road Widening at RT 09 in Tani Bakti Village « Road Hardening at Tunas Harapan Farmer Group RT 02 e Ditch Embankment in Tani Bhakti Village « Road Widening at RT 07 in Pondo Ore « Improvement of Usaha Tani Road PT Resource Alam Indonesia Tbk Public Expose 2024 www.raintbk.com
Page 35 OCR 0.898
Charity Program 5 RAIN GROUP e# Assistance for habitable houses from the East Kalimantan Governor's program, totaling 10 units. e Assistance in the construction of East Kalimantan Regional Police Officer guarters. e Assistance in the construction of Bhayangkari Police Wives School by the East Kalimantan Regional Police. PT Resource Alam Indonesia Tbk Public Expose 2024 www.raintbk.com
Page 36 OCR 0.900
Social Media PT Resource Alam Indonesia (RAIN) Tbk - KKGI Social media platforms fo) @rain.tbk (CB youtube.com/@kkgiinvestorrelation in Resource Alam Indonesia Tbk, PT | @KKGI Investor Relation TikTok
Page 37 OCR 0.959
RAIN GROUP www.raintbk.com PT Resource Alam Indonesia Tbk Public Expose 2024
Page 38 OCR 0.961
RAIN GROUP Thank You PT Resource Alam Indonesia Tbk Public Expose 2024 www.raintbk.com
Names mentioned 33 people and organisations named in the text · linked when the evidence is strong
unresolved
org
PT INSANI BARAPERKASA
p.4 ×11
unresolved
org
PT LOA HAUR
p.4 ×4
unresolved
org
PT KHATULISTIWA HIDRO ENERGI
p.4 ×2
unresolved
org
PT Bias Petrasia Persada
p.4
unresolved
org
PT PLN
p.4
unresolved
org
PT SEJAHTERA JAYA CITA
p.5
unresolved
org
LTD BUY BACK LIMITED
p.5
unresolved
org
PT INSANI BARA
p.5
unresolved
org
PT KALTIM Other Subsidiary
p.5
unresolved
org
PT LOA HAUR PERKASA MINERAL
p.5
unresolved
org
PT Insani Baraperkasa RAIN GROUP NORTH SEPARI BLOCK
p.6
unresolved
org
PT Insani Baraperkasa RAIN GROUP
p.7
unresolved
org
Minister of Energy and Mineral Resources.
p.7
unresolved
org
PT Ansaf Inti Resources
p.7
unresolved
org
PT Arta Bumi Sakti
p.7
unresolved
org
PT Resource Alam Energi
p.19
unresolved
org
MENTERI KETENAGAKERJAAN REPUBLAK INDONESIA Piagam Penghargaan
p.23
unresolved
org
PT INSANI BARAPERKASA Kalimantan Timur Sebagai Perusahaan Peneriina
p.23
unresolved
org
MENTERI KETENAGAKERJAAN REPUBLIK INDONESIA Pa SRS
p.23
unresolved
org
Ministry of Environment and Forestry
p.24
unresolved
org
Ministry of Energy and Mineral Resources
p.24
unresolved
person
Dr. Ir. H. Isran Noor
p.24
unresolved
org
PT BUMA Site
p.25
unresolved
org
PT Insani Baraperkasa. Category
p.25 ×2
unresolved
org
PT Ansaf Inti Resources Site
p.25 ×2
unresolved
org
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA PIAGAM PENGHARGAAN Menteri
p.25
unresolved
org
PT INSANI BARA PERKASA
p.26 ×2
unresolved
person
EDI DAMANSYAH
p.27
unresolved
org
PT. INSANI BARA PERKASA BUPATI KUTAI KARTANEGARA
p.28
Extraction attempts how the parser did, and what it refused
Nothing structured was extracted from this document — the attempts below say why.
No extraction attempted yet.