Skip to content
Back to announcement

20260429_INCO_Laporan Informasi dan Fakta Material_32075450_lamp2.pdf

Other Text extracted INCO

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 7

Page 1
                           PT Vale Achieves Solid 1Q26 Financial Performance
                             While Building Foundations for Future Growth

Jakarta, April 29, 2026 – PT Vale Indonesia Tbk (“PT Vale” or the “Company”, IDX Ticker: INCO)
today announced its production and financial results for the first quarter of 2026 (“1Q26”). Despite
lower nickel matte production and deliveries compared to previous periods, the Company successfully
delivered a strong financial performance, supported by higher realized prices, disciplined cost
management, and improved operational efficiency.

                                          Nickel in Matte Production Highlights


                                                                           1Q26           4Q25           1Q25

                            Nickel in matte production (t)                13,620         17,052         17,027

In 1Q26, PT Vale recorded nickel in matte production of 13,620 metric tons (tons), compared to
17,052 metric tons in 4Q25 and 17,027 metric tons in 1Q25. This outcome was fully in line with the
Company’s plan, reflecting conscious optimization of maintenance activities, including the Furnace 3
Rebuild that is on schedule for completion in the first half of 2026, as well as the impact of the
approved RKAB 2026. In line with the planned production adjustment, nickel matte deliveries
declined by 25% quarter-on-quarter. Looking ahead, PT Vale remains firmly on track to achieve its
full-year production target of 67,645 tons which is well positioned to capture the potential of recovery
in LME nickel price environment.

Beyond nickel matte production, 2026 represents a pivotal year in PT Vale’s growth trajectory, as the
Company started to operate three mining blocks Sorowako, Bahodopi, and Pomalaa simultaneously.
This strategic milestone was demonstrated by scalable production volume in each mining block, and
the first sale of nickel limonite ore from the Pomalaa area in early 2026, marking a meaningful
expansion of PT Vale’s commercial portfolio and strengthening earnings diversification going
forward.

                                    Nickel Saprolite & Limonite Ore Sales Volume
                                                                        1Q26             4Q25               1Q25

                          Bahodopi Block (in wmt)                       886,094          1,400,245              -
                          Pomalaa Block (in wmt)                        88,983           19,514                 -


The Company benefited from improving global nickel price dynamics during the quarter, with PT Vale
recording an average nickel matte price of US$14,213 per metric ton, representing a 15% increase
from US$12,308 per metric ton in 4Q25, and generating total revenue of US$252.7 million. Notably,
2026 marks the first full year of nickel matte sales with 82% payability, providing a stronger revenue
base and enhanced margin visibility. Going forward, with the LME nickel price expected to recover

                                                                                                                                             [ 1 ]
PT Vale Indonesia Tbk
Jakarta: Sequis Tower, 20th Floor, Unit 6 & 7, Jl. Jend. Sudirman Kav. 71, Jakarta 12190, Indonesia. T (62) 21 524 9000 F.(62) 21 524 9020
Makassar: Jl. Somba Opu No. 281, Makassar 90113, Indonesia. T.(62) 411 366 9000 F.(62) 411 366 9020
Sorowako: Main Office Plant Site Sorowako, Luwu Timur 92984, Indonesia. T.(62) 475 332 9100 F.(62) 475 332 9575
www.vale.com/indonesia
Page 2
from previous year’s level, the Company is well positioned to further capture value from its optimized
commercial structure.

On the cost side, the unit cash cost of sales for nickel matte in 1Q26 remained competitive at
US$10,382 per ton, slightly higher than US$9,573 per ton in 4Q25, primarily reflecting higher
commodity input prices. For the nickel ore business, unit cash costs remained stable, with Bahodopi
at US$21 per ton and Pomalaa at US$13 per ton, inclusive of royalties and logistics. In the near
future, the Company expects cash cost optimization to be driven by higher sales volumes from the
Pomalaa block as operations continue to scale up. Increased volume is anticipated to improve cost
efficiency and economies of scale.

PT Vale delivered strong earnings momentum in 1Q26, with EBITDA rising 29% quarter-on-quarter
to US$80.1 million and net profit surging 85% quarter-on-quarter to US$43.6 million, supported by
positive pricing environment and continued efficiencies. While revenue stood at US$252.7 million,
the fundamentals for growth remain firmly intact. Looking ahead, the Company expects stronger
EBITDA, revenue, and profit performance, driven by movement of LME nickel price and margin
expansion as volumes scale up.

                                                                 1Q26           4Q25           1Q25
                                     EBITDA1                      80.1           61.9           51.7

                                     Revenue1                    252.7          284.8          206.5
                                     Profit1                      43.6           23.6           21.8
                                     1
                                      US$ million


The table below outlines PT Vale's consumption and average prices for High Sulphur Fuel Oil (HSFO),
diesel, and coal:

                                                                           1Q26            4Q25                    1Q25
                  HSFO volume (barrels)                              267,927             281,885             319,536
                  HSFO average price per barrel                     US$76.65            US$78.24            US$84.64
                  Diesel volume (kilolitres)                          14,142              17,791              18,614
                  Diesel average price per litre                     US$0.82             US$0.84             US$0.79
                  Coal volume (t)                                     90,378             128,263             118,018
                  Coal average price per t (*)                     US$127.97           US$128.33           US$161.49
                  (*) Price in WMT (Wet Metric Ton) and CFR (Cost & Freight) basis


Quarter-on-quarter fuel consumption declined as planned, aligned with the Furnace 3 rebuild, while
sufficient buffer stocks ensured uninterrupted operations. Supported by disciplined procurement and
efficiency initiatives, average HSFO, diesel, and coal prices declined, reinforcing cost optimization
and supporting the Company’s ongoing consumption and emissions-reduction agenda.




                                                                                                                                          [ 2 ]
PT Vale Indonesia Tbk
Jakarta: Sequis Tower, 20th Floor, Unit 6 & 7, Jl. Jend. Sudirman Kav. 71, Jakarta 12190, Indonesia. T.(62) 21 524 9000 F.(62) 21 524 9020
Makassar: Jl. Somba Opu No. 281, Makassar 90113, Indonesia. T.(62) 411 366 9000 F.(62) 411 366 9020
Sorowako: Main Office Plant Site Sorowako, Luwu Timur 92984, Indonesia. T.(62) 475 332 9100 F.(62) 475 332 9575
www.vale.com/indonesia
Page 3
On April 23, 2026, PT Vale reached a significant milestone with the signing of its Sustainability-Linked
Loan (SLL). The transaction strengthens the Company’s sustainable finance strategy through an
ESG-linked syndicated loan facility totaling US$750 million. Notably, this marks the first
Sustainability-Linked Loan in the mining industry in Southeast Asia, reinforcing PT Vale’s leadership
in embedding sustainability into its financing framework.

During the quarter, the Company disbursed approximately US$139.0 million in capital expenditure,
supporting both sustaining activities and strategic growth projects. As of March 31, 2026, cash and
cash equivalents stood at US$220.1 million, compared with US$376.4 million as of December 31,
2025. PT Vale remains committed to prudent capital allocation and disciplined liquidity management
to preserve financial resilience while continuing to support long-term growth.

“Despite ongoing challenges and an uncertainty, we continue to demonstrate our ability to maintain
healthy margins and financial discipline,” said Bernardus Irmanto, CEO and President Director of PT
Vale. “At the same time, we are broadening our commercial portfolio through the commencement of
limonite sales from the Pomalaa block, which marks an important step in strengthening revenue
diversification and enhancing the sustainability of our business going forward.”

Readers are encouraged to review the Company’s results. Operational achievements and interim
financial results are summarized on the following pages – all figures are in US$ except for nickel in
matte production and deliveries which are in metric tons.




                                                                                  For further information, please contact:

                                                                             Rizky Putra, Director & Chief Financial Officer
                                                                                        📧 ptvi.investorrelation@vale.com

                                                                 Andaru Adi, Head of Corporate Finance, Treasury and
                                                                                                   Investor Relations
                                                                                            📧 andaru.adi@vale.com

                                                                         🌐 visit our website at: www.vale.com/indonesia
                                                                                        📞 call us at: (+62 21) 524 9000




                                                                                                                                          [ 3 ]
PT Vale Indonesia Tbk
Jakarta: Sequis Tower, 20th Floor, Unit 6 & 7, Jl. Jend. Sudirman Kav. 71, Jakarta 12190, Indonesia. T.(62) 21 524 9000 F.(62) 21 524 9020
Makassar: Jl. Somba Opu No. 281, Makassar 90113, Indonesia. T.(62) 411 366 9000 F.(62) 411 366 9020
Sorowako: Main Office Plant Site Sorowako, Luwu Timur 92984, Indonesia. T.(62) 475 332 9100 F.(62) 475 332 9575
www.vale.com/indonesia
Page 4
                                                           PT Vale Indonesia Tbk
                                                    Production and Financial Highlights


                                                                               1Q26              4Q25              1Q25

                      Nickel in matte production1                            13,620            17,052             17,027

                      Nickel matte deliveries1                               13,727            18,418             17,096

                      Nickel matte average realized price2                   14,213            12,308             11,932
                      EBITDA3                                                    80.1              61.9              51.7
                      Revenue3                                                 252.7             284.8             206.5
                      Profit3                                                    43.6              23.6              21.8
                      Earnings per share4                                    0.0041            0.0022             0.0021

                  1
                    metric ton (t)
                  2
                    US$ per t
                  3
                    US$ million
                  4
                    US$




                                                                                                                                          [ 4 ]
PT Vale Indonesia Tbk
Jakarta: Sequis Tower, 20th Floor, Unit 6 & 7, Jl. Jend. Sudirman Kav. 71, Jakarta 12190, Indonesia. T.(62) 21 524 9000 F.(62) 21 524 9020
Makassar: Jl. Somba Opu No. 281, Makassar 90113, Indonesia. T.(62) 411 366 9000 F.(62) 411 366 9020
Sorowako: Main Office Plant Site Sorowako, Luwu Timur 92984, Indonesia. T.(62) 475 332 9100 F.(62) 475 332 9575
www.vale.com/indonesia
Page 5
                                            PT Vale Indonesia Tbk
                    Interim Statements of Profit or Loss and Other Comprehensive Income
                            (In thousands of US$ except basic earnings per share)

                                                                               1Q26                  4Q25                 1Q25

   Revenue                                                                       252,663              284,806             206,525
   Cost of revenue                                                              (195,925)            (247,439)           (187,012)
   Gross profit                                                                   56,738               37,367              19,513

   Operating expenses                                                             (8,907)              (27,577)             (7,901)
   Other income                                                                    3,677                 3,609                 101
   Other expenses                                                                 (1,110)               (7,356)             (2,931)
   Net profit sharing                                                             (4,846)               (2,623)             (2,422)
   Operating profit                                                               45,552                 3,420               6,360
   Gain from loss of control of subsidiary                                                -              (1,798)                448
   Share in net profit from associate                                                 (68)                  896                   23
   Gain on recognition of fair value of
     investment in shares                                                                 -               6,680                     -
   Gain/(loss) on recognition of fair value of derivative
    asset                                                                                 -                     -           16,570
   Finance income                                                                   3,463               15,754               7,553
   Finance costs                                                                   (2,382)              (2,597)             (2,046)

   Profit before income tax                                                       46,565                22,355              28,908
   Income tax expense                                                              (2,953)                1,261             (7,113)

   Profit for the period                                                          43,612                23,616              21,795

   Other comprehensive income
   Items that will not be reclassified to profit or loss:
      − Changes resulting from actuarial remeasurement
         of post-employment benefit liabilities                                           -                   57                    -
      − Related income tax                                                                -                  (12)                   -

   Items that will be reclassified to profit or loss:
       - Currency differences from translation of
           associate entity’s financial statements                                 (1,151)                 (487)                    -

   Total other comprehensive loss                                                  (1,151)                 (442)                    -
   Total comprehensive income for the period                                      42,461                23,174              21,795

   Earnings per share
   - Basic and diluted (in full amount of US Dollars)
                                                                                  0.0041                0.0022              0.0021




                                                                                                                                        [ 5 ]
PT Vale Indonesia Tbk
Jakarta: Sequis Tower, 20th Floor, Unit 6 & 7, Jl. Jend. Sudirman Kav. 71, Jakarta 12190, Indonesia. T (62) 21 524 9000 F.(62) 21 524 9020
Makassar: Jl. Somba Opu No. 281, Makassar 90113, Indonesia. T.(62) 411 366 9000 F.(62) 411 366 9020
Sorowako: Main Office Plant Site Sorowako, Luwu Timur 92984, Indonesia. T.(62) 475 332 9100 F.(62) 475 332 9575
www.vale.com/indonesia
Page 6
                                                      PT Vale Indonesia Tbk
                                             Interim Statements of Financial Position
                                                      (In thousands of US$)

                                                                March 31,                     December 31,                      March 31,
                                                                  2026                            2025                            2025
Assets                                                         (Unaudited)                      (Audited)                      (Unaudited)
Cash and cash equivalents                                            220,117                           376,359                      601,395
Trade receivables - Related parties                                   88,584                            73,184                       87,797
                   - Third parties                                     5,805                                563                            -
Inventories                                                          218,379                           192,070                      170,827
Prepaid taxes – Corporate Income Tax                                  59,048                                  -                       3,810
                – Other taxes                                         94,654                            97,333                       68,154
Prepayments and advances                                               4,056                              4,159                       8,125
Other current financial assets                                         2,230                              5,829                       6,602
            Total current assets                                     692,873                           749,497                      946,710

Restricted cash                                                         127,405                            96,987                     86,650
Prepaid taxes - Corporate income tax                                      3,292                            59,346                     61,534
              - Other taxes                                              30,885                            17,795                     13,286
Investments in shares                                                    19,950                            19,950                     12,934
Investments in associate                                                 57,031                            58,249                     58,375
Derivative asset                                                         21,320                            21,320                     21,320
Fixed assets                                                          2,380,561                         2,313,449                  1,978,015
Prepayments and advances                                                  2,905                             2,251                          -
Deferred tax assets                                                         329                             3,040                          -
Other non-current financial assets                                        3,581                             3,963                      3,534
             Total non-current assets                                 2,647,259                         2,596,350                  2,235,648
Total assets                                                          3,340,132                         3,345,847                  3,182,358

Liabilities and Equity
Trade payables - Related parties                                              -                               400                           -
                  - Third parties                                       174,102                           203,409                     153,886
Accruals                                                                116,504                           115,397                      67,564
Short-term employee benefit liabilities                                  12,285                            21,966                      11,914
Taxes payable – Corp. Income Tax                                          3,355                             5,439                       5,506
                  – Other Taxes                                           6,555                             1,859                           -
Lease liabilities                                                         2,897                             3,451                       4,579
Share-based payment liabilities                                               -                                 -                         242
Provision for asset retirement                                            8,799                             9,465                       4,282
Other current financial liabilities                                       1,125                             1,004                       1,172
            Total current liabilities                                   325,622                           362,390                     249,145

Long-term post-employment benefit
  liabilities                                                            49,440                            49,042                     43,365
Deferred tax liabilities                                                      -                                 -                      9,492
Lease liabilities                                                            18                                31                      1,366
Provision for asset retirement                                          140,843                           153,426                    116,374
Other non-current financial liabilities                                   5,880                             5,882                      6,044
              Total non-current liabilities                             196,181                           208,381                    176,641
Total liabilities                                                       521,803                           570,771                    425,786
Equity                                                                2,818,329                         2,775,076                  2,756,572

Total liabilities and equity                                          3,340,132                         3,345,847                  3,182,358
                                                                                                                                         [ 6 ]
  PT Vale Indonesia Tbk
  Jakarta: Sequis Tower, 20th Floor, Unit 6 & 7, Jl. Jend. Sudirman Kav. 71, Jakarta 12190, Indonesia. T.(62) 21 524 9000 F.(62) 21 524 9020
  Makassar: Jl. Somba Opu No. 281, Makassar 90113, Indonesia. T.(62) 411 366 9000 F.(62) 411 366 9020
  Sorowako: Main Office Plant Site Sorowako, Luwu Timur 92984, Indonesia. T.(62) 475 332 9100 F.(62) 475 332 9575
  www.vale.com/indonesia
Page 7
                                                  PT Vale Indonesia Tbk
                                            Interim Statements of Cash Flows
                                                  (In thousands of US$)

                                                                                 1Q26                    4Q25             1Q25
Cash flows from operating activities
Receipts from customers                                                         247,298              290,223             203,178
Payments to suppliers                                                          (128,196)            (193,004)           (113,308)
Payments of corporate income tax                                                 (4,831)              (7,212)             (4,753)
Payments of other taxes                                                         (21,871)             (12,470)            (22,336)
Receipt of corporate income tax refund                                                 -               4,715
Receipts of refunds of other taxes                                                   41                2,268               35,195
Payments to employees                                                           (39,950)              (9,104)             (36,163)
Placement of financial guarantee                                                (40,806)                    -                   -
Receipts of finance income                                                        3,462                5,417                7,553
Payments of royalties and levies                                                (32,722)             (34,632)             (13,685)
Net cash flows (used in)/provided by operating
                                                                                 (17,575)              46,201              55,681
  activities

Cash flows from investing activities
Payments for acquisition of fixed assets                                       (139,042)            (154,449)           (128,095)
Proceeds from disposal of fixed assets                                              325                1,226                    -
Payment for additional investment in associate                                                        (9,838)                   -
Net cash flow decrease from loss of control of a subsidiary                            -                  77                (880)
Net cash flows used in investing activities                                    (138,717)            (162,984)           (128,975)

Cash flows from financing activities
Payments of lease liabilities                                                      (1,289)             (4,517)              (1,454)
Payment of dividends                                                                                   (2,286)
Payments of finance costs                                                              (47)               (66)                  (87)
Net cash flows provided by financing activities                                    (1,336)             (6,869)              (1,541)
                                                                               (157,628)            (123,652)
Net decrease in cash and cash equivalents                                                                                 (74,835)

Cash and cash equivalents at the beginning of the                               376,359              496,337              674,690
 period

Effect of exchange rate changes on cash                                             1,386                3,657               1,540
  and cash equivalents

Cash and cash equivalents at the end of the                                     220,117              376,359              601,395
 period




                                                                                                                                       [ 7 ]
PT Vale Indonesia Tbk
Jakarta: Sequis Tower, 20th Floor, Unit 6 & 7, Jl. Jend. Sudirman Kav. 71, Jakarta 12190, Indonesia. T.(62) 21 524 9000 F.(62) 21 524 9020
Makassar: Jl. Somba Opu No. 281, Makassar 90113, Indonesia. T.(62) 411 366 9000 F.(62) 411 366 9020
Sorowako: Main Office Plant Site Sorowako, Luwu Timur 92984, Indonesia. T.(62) 475 332 9100 F.(62) 475 332 9575
www.vale.com/indonesia

File

File Open PDF
Source IDX
Size4.19 MB
Published29 Apr 2026
Pages7
Characters28,051
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 4 people and organisations named in the text · linked when the evidence is strong

linked person Bernardus Irmanto p.3
possible org Vale Indonesia Tbk p.1 ×24
unresolved org PT Vale Achieves Solid p.1
unresolved org PT Vale’s p.1 ×4

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result