Extracted text 8

Page 1
Go To English Page

 Nomor Surat                           331/PGE500/2026-S0

 Nama Perusahaan                       PT Pertamina Geothermal Energy Tbk

 Kode Emiten                           PGEO

 Lampiran                              0
                                       Hadir di IIGCE 2026, PGE Optimalkan Aset Ulubelu dan Lahendong serta Buka
 Perihal
                                       Potensi Baru Panas Bumi di Cubadak Panti


Dengan ini kami untuk dan atas nama perusahaan menyampaikan Laporan Informasi atau Fakta Material sebagai
berikut:

 Nama Emiten atau Perusahaan Publik            PT Pertamina Geothermal Energy Tbk

 Bidang Usaha                                  Menyelenggarakan usaha bidang panas bumi dari hulu/hilir



 Telepon                                       +62 21 3983 3222

 Faksimili                                     +62 21 3983 3230

 Alamat Surat Elektronik (email)               datapge@pertamina.com


 Tanggal Kejadian                              21 Agustus 2026
 Jenis Informasi atau Fakta Material           Hadir di IIGCE 2026, PGE Optimalkan Aset Ulubelu dan
                                               Lahendong serta Buka Potensi Baru Panas Bumi di Cubadak
                                               Panti

Page 2
Uraian Informasi atau Fakta Material   Menjelang satu abad perjalanan panas bumi Indonesia, PT
                                       Pertamina Geothermal Energy Tbk (PGE) (IDX: PGEO)
                                       kembali menegaskan komitmennya dalam mengakselerasi
                                       transisi energi guna memperkuat ketahanan energi dan
                                       menciptakan nilai jangka panjang bagi masyarakat. Hal ini
                                       diwujudkan dengan percepatan pengembangan PLTP Ulubelu
                                       Bottoming Unit (BU) dan PLTP Lahendong BU, serta
                                       penerimaan mandat survei potensi panas bumi di Cubadak
                                       Panti, Sumatra Barat.
                                       Hal ini tercapai dalam gelaran The 12th Indonesia International
                                       Geothermal Convention & Exhibition (IIGCE) 2026 di Jakarta,
                                       melalui penandatanganan 2 (dua) Letter of Intent (LoI) antara
                                       PT PLN (Persero) dengan Konsorsium PGE dan PT PLN
                                       Indonesia Power (PLN IP) untuk pengembangan PLTP
                                       Ulubelu BU dan PLTP Lahendong BU, serta penyerahan Surat
                                       Keputusan (SK) Menteri ESDM mengenai penugasan PSPE
                                       Cubadak Panti kepada PGE.
                                       Bagi PGE, ketiga capaian ini menjadi tonggak baru dalam
                                       pengembangan energi panas bumi nasional, sekaligus
                                       memperkuat langkah PGE dalam menjadi world leading
                                       geothermal producer.
                                       Optimalkan Pengembangan Panas Bumi Ulubelu dan
                                       Lahendong
                                       Pada hari pertama IIGCE 2026, PGE, PLN IP, dan PLN
                                       menandatangani LoI untuk pembelian listrik panas bumi dari
                                       PLTP Ulubelu BU berkapasitas 30 megawatt (MW) dan PLTP
                                       Lahendong Bottoming Unit berkapasitas 15 MW yang akan
                                       dikembangkan bersama oleh PGE dan PLN IP melalui joint
                                       venture.
                                       Penandatanganan dilakukan oleh Direktur Utama PGE Ahmad
                                       Yani, Direktur Utama PLN IP Bernardus Sudarmanta, serta
                                       Direktur Utama PLN Darmawan Prasodjo dengan disaksikan
                                       oleh, Menteri ESDM Bahlil Lahadalia, Direktur Jenderal Energi
                                       Baru, Terbarukan, dan Konservasi Energi (EBTKE), Prof. Dr.
                                       Eng. Eniya Listiani Dewi dan Direktur Utama PT Pertamina
                                       (Persero) Simon Aloysius Mantiri.
                                       Direktur Utama PGE Ahmad Yani menyambut positif langkah
                                       tersebut sebagai bagian dari upaya mengoptimalkan potensi
                                       pembangkit panas bumi yang telah beroperasi. Kami
                                       menyambut penandatanganan LoI ini dengan penuh
                                       optimisme. PLTP Ulubelu dan Lahendong selama ini telah
                                       berperan penting dalam penyediaan listrik di Lampung dan
                                       Sulawesi Utara. PGE yakin bahwa tambahan unit yang kami
                                       kembangkan bersama PLN IP ini akan menyediakan suplai
                                       listrik yang bersih nan andal untuk semakin banyak rumah
                                       tangga, yang akan mampu mendorong pertumbuhan ekonomi
                                       masyarakat secara berkelanjutan. Ini merupakan bagian dari
                                       komitmen kami untuk menyediakan energi yang
                                       memberdayakan masyarakat, jelas Ahmad Yani.
                                       Proyek PLTP Ulubelu BU dan PLTP Lahendong BU
                                       merupakan pengembangan pembangkit yang mengolah panas
                                       sisa dari operasi pembangkit panas bumi eksisting untuk
                                       menghasilkan tambahan listrik melalui teknologi binary
                                       (bottoming cycle). Pengembangan ini sejalan dengan salah
                                       satu strategi pertumbuhan PGE, yaitu optimalisasi aset
                                       eksisting.
                                       Sebelumnya, konsorsium PGE dan PLN IP telah menyepakati
                                       tarif listrik dengan PLN sebagai offtaker untuk PLTP Ulubelu
                                       BU pada Desember 2025, dan PLTP Lahendong BU pada
                                       April 2026. Penandatanganan LoI menjadi langkah lanjutan
                                       menuju tahap pengembangan kedua proyek. Adapun langkah
                                       berikutnya meliputi pendirian joint venture, penyusunan Power
                                       Purchase Agreement (PPA), serta proses Engineering,

Page 3
Procurement, Construction, and Commissioning (EPCC).
Kedua pembangkit ditargetkan mencapai Commercial
Operation Date (COD) pada tahun 2028.
Membuka Potensi Panas Bumi Cubadak Panti
Selain penandatanganan LoI, PGE pada hari yang sama juga
menerima Surat Keputusan (SK) Menteri ESDM Nomor
176.K/EK.04/MEM.E/2026 tentang Penugasan Survei
Pendahuluan dan Eksplorasi (PSPE) Panas Bumi kepada
PGE di wilayah PSPE Daerah Cubadak Panti, Kabupaten
Pasaman dan Kabupaten Pasaman Barat, Provinsi Sumatra
Barat. SK tersebut diserahkan langsung oleh Menteri Bahlil
kepada Direktur Utama PGE Ahmad Yani dengan disaksikan
oleh Dirjen EBTKE Prof. Dr. Eng. Eniya Listiani Dewi dan
Direktur Utama Pertamina Simon Aloysius Mantiri.
Penugasan ini menjadi langkah awal PGE untuk
mengidentifikasi dan membuktikan potensi panas bumi di
wilayah Cubadak Panti. Sebelumnya, PGE berhasil
menempati peringkat pertama dalam proses seleksi kompetitif
yang diselenggarakan Kementerian ESDM dengan nilai
penilaian 87,01.
Wilayah PSPE Cubadak Panti mencakup area seluas 29.897
hektare. Berdasarkan data awal, wilayah ini diperkirakan
memiliki potensi cadangan panas bumi sebesar 77 megawatts
electric (MWe). Jika terbukti, potensi tersebut akan mampu
memenuhi kebutuhan listrik sekitar 40 ribu rumah tangga.
Direktur Utama PGE Ahmad Yani menyampaikan apresiasi
atas kepercayaan yang diberikan kepada PGE untuk
melaksanakan mandat eksplorasi tersebut. Tanggung jawab
ini menjadi bagian dari komitmen PGE untuk terus mendukung
target Net Zero Emission 2060 dan memperkuat ketahanan
energi nasional. Penugasan ini juga sejalan dengan komitmen
Provinsi Sumatra barat sebagai Green Province. Dengan
sinergi yang kuat antara pemerintah, pelaku usaha, dan
masyarakat, PGE akan melaksanakan mandat ini agar dapat
mengubah potensi panas bumi Cubadak Panti menjadi
manfaat yang berkelanjutan dan bernilai tambah bagi
masyarakat.
Memasuki Fase Baru Pengembangan Panas Bumi Nasional
Dua capaian tersebut menjadi semakin bermakna di tengah
momentum menuju 100 tahun perjalanan pengembangan
panas bumi Indonesia. Setelah satu abad perjalanan
membangun fondasi industri panas bumi nasional, Indonesia
kini memiliki kesempatan untuk membawa energi panas bumi
ke skala yang lebih besar sebagai salah satu kekuatan energi
bersih nasional.
Bagi PGE, momentum tersebut menjadi dorongan untuk terus
menjaga keandalan operasi sekaligus mempercepat
pengembangan kapasitas baru. Saat ini, sejumlah proyek
strategis tengah dikembangkan, antara lain PLTP Lumut Balai
Unit 3 dan 4 di Sumatra Selatan, PLTP Hululais Unit 1 dan 2 di
Bengkulu, PLTP Lahendong Unit 7 - 8 & Binary Unit di
Sulawesi Utara, dan proyek Gunung Tiga di Lampung.
Menjelang 100 tahun perjalanan panas bumi Indonesia, kami
melihat masa depan dengan optimisme. Jika satu abad
terakhir adalah perjalanan untuk membuktikan potensi panas
bumi nasional, maka abad berikutnya adalah kesempatan
untuk menjadikannya salah satu kekuatan utama Indonesia.
PGE akan terus menjaga keandalan, mempercepat
pengembangan, dan memperluas manfaat panas bumi agar
energi dari bumi Indonesia dapat menjadi energi bagi
kemajuan bangsa. Inilah kontribusi kami untuk mewujudkan
Indonesia yang berdaulat, adil, dan makmur jelas Ahmad
Yani.

Page 4
Dampak kejadian, informasi atau fakta
material tersebut terhadap kegiatan
operasional, hukum, kondisi keuangan,
atau kelangsungan usaha Emiten atau
Perusahaan Publik



Demikian untuk diketahui.


Hormat Kami,
PT Pertamina Geothermal Energy Tbk




Muhammad Taufik

Corporate Secretary




PT Pertamina Geothermal Energy Tbk
Grha Pertamina - Tower Pertamax Lt.7
Telepon : +62 21 3983 3222, Fax : +62 21 3983 3230, https://www.pge.pertamina.



Nama Pengirim                     Muhammad Taufik

Jabatan                           Corporate Secretary
Tanggal dan Waktu                 21-08-2026 21:09




   Dokumen ini merupakan dokumen resmi PT Pertamina Geothermal Energy Tbk yang tidak memerlukan tanda
tangan karena dihasilkan secara elektronik oleh sistem pelaporan elektronik. PT Pertamina Geothermal Energy Tbk
                   bertanggung jawab penuh atas informasi yang tertera didalam dokumen ini.

Page 5
Go To Indonesian Page

 Letter / Announcement No.           331/PGE500/2026-S0

 Issuer Name                         PT Pertamina Geothermal Energy Tbk

 Issuer Code                         PGEO

 Attachment                          0

 Subject                             At IIGCE 2026, PGE Optimizes the Ulubelu and Lahendong Assets and
                                     Unlocks New Geothermal Potential in Cubadak Panti

The company hereby announce the Material Information or Facts Report as follows

 Name of Issuer or Public Company            PT Pertamina Geothermal Energy Tbk

 Business Activities                         Menyelenggarakan usaha bidang panas bumi dari hulu/hilir


 Telephone                                   +62 21 3983 3222

 Faximile                                    +62 21 3983 3230

 Email Address                               datapge@pertamina.com


 Date of Event                               21 August 2026

                                             At IIGCE 2026, PGE Optimizes the Ulubelu and Lahendong
 Type of Material Information or Facts       Assets and Unlocks New Geothermal Potential in Cubadak
                                             Panti

Page 6
Description of Material Information or   As Indonesias geothermal journey approaches its centennial,
Facts                                    PT Pertamina Geothermal Energy Tbk (PGE) (IDX: PGEO)
                                         has reaffirmed its commitment to accelerating the energy
                                         transition to strengthen energy security and create long-term
                                         value for the community. This commitment is being realized
                                         through the accelerated development of the Ulubelu Bottoming
                                         Unit (BU) geothermal power plant and the Lahendong BU
                                         geothermal power plant, as well as the receipt of a mandate to
                                         survey geothermal potential in Cubadak Panti, West Sumatra.
                                         These achievements were made during The 12th Indonesia
                                         International Geothermal Convention & Exhibition (IIGCE)
                                         2026 in Jakarta, through the signing of two Letters of Intent
                                         (LoI) between PT PLN (Persero) and the PGE Consortium and
                                         PT PLN Indonesia Power (PLN IP) for the development of the
                                         Ulubelu BU and Lahendong BU geothermal power plants, as
                                         well as the handover of the Minister of Energy and Mineral
                                         Resources Decree regarding the assignment of the Cubadak
                                         Panti geothermal potential survey to PGE.
                                         For PGE, these three achievements mark a new milestone in
                                         the development of national geothermal energy, while also
                                         strengthening PGEs efforts to become a world-leading
                                         geothermal producer.
                                         As Indonesias geothermal journey approaches its centennial,
                                         PT Pertamina Geothermal Energy Tbk (PGE) (IDX: PGEO)
                                         has reaffirmed its commitment to accelerating the energy
                                         transition to strengthen energy security and create long-term
                                         value for the community. This commitment is being realized
                                         through the accelerated development of the Ulubelu Bottoming
                                         Unit (BU) geothermal power plant and the Lahendong BU
                                         geothermal power plant, as well as the receipt of a mandate to
                                         survey geothermal potential in Cubadak Panti, West Sumatra.
                                         These achievements were made during The 12th Indonesia
                                         International Geothermal Convention & Exhibition (IIGCE)
                                         2026 in Jakarta, through the signing of two Letters of Intent
                                         (LoI) between PT PLN (Persero) and the PGE Consortium and
                                         PT PLN Indonesia Power (PLN IP) for the development of the
                                         Ulubelu BU and Lahendong BU geothermal power plants, as
                                         well as the handover of the Minister of Energy and Mineral
                                         Resources Decree regarding the assignment of the Cubadak
                                         Panti geothermal potential survey to PGE.
                                         For PGE, these three achievements mark a new milestone in
                                         the development of national geothermal energy, while also
                                         strengthening PGEs efforts to become a world-leading
                                         geothermal producer.

                                         Optimizing the Development of the Ulubelu and Lahendong
                                         Geothermal Projects
                                         On the first day of IIGCE 2026, PGE, PLN IP, and PLN signed
                                         a Letter of Intent (LoI) for the purchase of geothermal
                                         electricity from the 30-megawatt (MW) Ulubelu BU geothermal
                                         power plant and the 15-MW Lahendong Bottoming Unit
                                         geothermal power plant, which will be jointly developed by
                                         PGE and PLN IP through a joint venture.
                                         The signing was conducted by PGE President Director Ahmad
                                         Yani, PLN IP President Director Bernardus Sudarmanta, and
                                         PLN President Director Darmawan Prasodjo, and was
                                         witnessed by Minister of Energy and Mineral Resources Bahlil
                                         Lahadalia, Director General of New, Renewable, and Energy
                                         Conservation (EBTKE), Prof. Dr. Eng. Eniya Listiani Dewi, and
                                         the President Director of PT Pertamina (Persero), Simon
                                         Aloysius Mantiri.
                                         PGE President Director Ahmad Yani welcomed this step as
                                         part of efforts to optimize the potential of existing geothermal

Page 7
power plants. We view the signing of this LoI with great
optimism. The Ulubelu and Lahendong geothermal power
plants have long played a vital role in providing electricity to
Lampung and North Sulawesi. PGE is confident that the
additional units we are developing together with PLN IP will
provide a clean and reliable electricity supply to an increasing
number of households, which will drive sustainable economic
growth for the community. This is part of our commitment to
providing energy that empowers the community, explained
Ahmad Yani.
The Ulubelu BU and Lahendong BU geothermal power plant
projects involve the development of power plants that utilize
waste heat from existing geothermal power plant operations to
generate additional electricity using binary (bottoming cycle)
technology. This development aligns with one of PGEs growth
strategies: the optimization of existing assets.
Previously, the PGE and PLN IP consortium had agreed on
electricity rates with PLN as the off-taker for the Ulubelu BU
Geothermal Power Plant in December 2025 and the
Lahendong BU Geothermal Power Plant in April 2026. The
signing of the Letter of Intent (LoI) marks the next step toward
the development phase of both projects. The next steps
include establishing a joint venture, drafting a Power Purchase
Agreement (PPA), and carrying out the Engineering,
Procurement, Construction, and Commissioning (EPCC)
process. Both power plants are targeted to reach their
Commercial Operation Date (COD) in 2028.
Unlocking the Geothermal Potential of Cubadak Panti
In addition to signing the LoI, on the same day PGE also
received Ministerial Decree (SK) No. 176.K/EK.04/MEM.
E/2026 regarding the Assignment of Preliminary Survey and
Exploration (PSPE) for Geothermal Energy to PGE in the
Cubadak Panti PSPE area, Pasaman and West Pasaman
Regencies, West Sumatra Province. The SK was handed over
directly by Minister Bahlil to PGE President Director Ahmad
Yani, witnessed by Director General of New and Renewable
Energy and Energy Conservation (EBTKE) Prof. Dr. Eng.
Eniya Listiani Dewi and Pertamina President Director Simon
Aloysius Mantiri.
This assignment marks PGEs first step toward identifying and
verifying geothermal potential in the Cubadak Panti area.
Previously, PGE ranked first in a competitive selection process
organized by the Ministry of Energy and Mineral Resources,
with a score of 87.01.
The Cubadak Panti PSPE area covers 29,897 hectares. Based
on preliminary data, this area is estimated to have geothermal
reserve potential of 77 megawatts electric (MWe). If confirmed,
this potential would be sufficient to meet the electricity needs
of approximately 40,000 households.
PGE President Director Ahmad Yani expressed his
appreciation for the trust placed in PGE to carry out this
exploration mandate. This responsibility is part of PGEs
commitment to continue supporting the 2060 Net Zero
Emission target and strengthening national energy security.
This assignment also aligns with West Sumatra Provinces
commitment to becoming a Green Province. Through strong
synergy between the government, the private sector, and the
community, PGE will carry out this mandate to transform the
geothermal potential of Cubadak Panti into sustainable
benefits and added value for the community.
Entering a New Phase of National Geothermal Development
These two achievements take on even greater significance as
Indonesia approaches the 100th anniversary of its geothermal

Page 8
                                              development journey. After a century of laying the foundation
                                              for the national geothermal industry, Indonesia now has the
                                              opportunity to scale up geothermal energy as one of the
                                              nations clean energy pillars.
                                              For PGE, this momentum serves as an impetus to continue
                                              ensuring operational reliability while accelerating the
                                              development of new capacity. Currently, a number of strategic
                                              projects are under development, including the Lumut Balai
                                              Geothermal Power Plant Units 3 and 4 in South Sumatra, the
                                              Hululais Geothermal Power Plant Units 1 and 2 in Bengkulu,
                                              the Lahendong Geothermal Power Plant Units 7 - 8 and Binary
                                              Unit in North Sulawesi, and the Gunung Tiga project in
                                              Lampung.
                                              As we approach the 100th anniversary of Indonesias
                                              geothermal journey, we look to the future with optimism. If the
                                              past century was a journey to prove the nations geothermal
                                              potential, then the next century is an opportunity to make it one
                                              of Indonesias key strengths. PGE will continue to ensure
                                              reliability, accelerate development, and expand the benefits of
                                              geothermal energy so that energy from Indonesias earth can
                                              fuel the nations progress. This is our contribution to realizing a
                                              sovereign, just, and prosperous Indonesia, stated Ahmad Yani.
 Impact of event, material information or
 facts towards Issuers or Public
 Company’s operational activities, legal,
 financial condition, or going concern




Thus to be informed accordingly.


Respectfully,
PT Pertamina Geothermal Energy Tbk




Muhammad Taufik

Corporate Secretary




PT Pertamina Geothermal Energy Tbk
Grha Pertamina - Tower Pertamax Lt.7
Phone : +62 21 3983 3222, Fax : +62 21 3983 3230, https://www.pge.pertamina.com



Sender Name                          Muhammad Taufik

Function                             Corporate Secretary

Date and Time                        21-08-2026 21:09




   This is an official document of PT Pertamina Geothermal Energy Tbk that does not require a signature as it was
      generated electronically by the electronic reporting system. PT Pertamina Geothermal Energy Tbk is fully
                            responsible for the information contained within this document.


File

File Open PDF
Source IDX
Size0.02 MB
Published21 Aug 2026
Pages8
Characters24,843
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 15 people and organisations named in the text · linked when the evidence is strong

linked org Pertamina Geothermal Energy Tbk · Nama Perusahaan p.1 ×45
linked person Ahmad Yani p.2 ×12
possible person Darmawan Prasodjo p.2 ×2
possible org PT Pertamina (Persero) p.2 ×2
unresolved org PT PLN (Persero) p.2 ×3
unresolved org PT PLN Indonesia Power p.2 ×3
unresolved org Menteri ESDM p.2 ×2
unresolved org Menteri ESDM Bahlil Lahadalia p.2
unresolved person Prof. Dr. Eng. Eniya Listiani Dewi p.2 ×8
unresolved org Menteri Bahlil p.3
unresolved org Kementerian ESDM p.3
unresolved person Muhammad Taufik · Corporate Secretary p.4 ×2
unresolved org Minister of Energy and Mineral Resources Decree p.6 ×2
unresolved org Minister of Energy and Mineral Resources Bahlil Lahadalia p.6
unresolved org Ministry of Energy and Mineral Resources p.7

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result