PT Kencana Energi Lestari Tbk
           April 2026
Page 2
Overview



01         www.kencanaenergy.com
Page 3
Sekilas PT Kencana Energi Lestari Tbk

    Profil Singkat Perseroan
                                                               PT Paramita
                                                                                                          Other Shareholders        Publik
•    PT Kencana Energi Lestari Tbk (“KEEN” atau                Indah Lestari
     “Kencana Energy”) adalah Independent Power
     Producer (IPP) yang berfokus pada EBT                         30%                 25%                       28%                 17%



•    Listing di IDX pada tahun 2019


•    Merangkul Perusahaan Listrik terbesar di Jepang,
     Tokyo Electric Power Company (“TEPCO”) dalam
     strategic partnership di tahun 2022                          Project Level SPCs


•    Kencana Energy selalu berupaya mengembangkan
     berbagai tipe EBT, mulai dari Hidro, Biomasa, Surya,          PLTA / PLTM          PLTS                    PLTBM           Future
     dan bahkan Bayu                                                  59 MW            5.3 MW                    5 MW          Projects




                                Total Kapasitas                                              EBT Dibangkitkan                  Kapitalisasi
                                                            Pipeline Proyek
                                Terpasang                                                    (2025)                            Pasar1 (IDR)


                                69 MW                       500+ MW                          376 GWh                           3.7 T
Source: Company Data
Notes:1) Per 31 Desember 2025
                                                                                                                                              3
Page 4
Proyek-Proyek Kami : Hydro
                        : Under
 : Operating
                        Construction


      PLTA Pakkat                                               PLTA Air Putih                                        PLTM Ma’dong

Capacity                18 MW                             Capacity            21 MW                            Capacity            10 MW

Location                North Sumatra                     Location            Bengkulu                         Location            South Sulawesi

Contract Duration       30 Years                          Contract Duration   30 Years                         Contract Duration   20 Years

COD                     January 2018                      COD                 January 2020                     COD                 March 2022




                                       PLTM Ordi Hulu                                        PLTM Salu Noling

                              Capacity            10 MW                               Capacity            10 MW

                              Location            North Sumatera                      Location            South Sulawesi

                              Contract Duration   20 Years                            Contract Duration   25 Years

                              COD                 March 2024                          COD                 June 2026




 Source: Company Data
 Notes:
Page 5
Proyek-Proyek Kami : Non-Hydro

                       : Under
: Operating
                       Construction




      PLTBm Tempilang                                  PLTS Tempilang                          PLTS Tempilang 2

Capacity                5 MW
                                                  Capacity      1,36 MWp                  Capacity      4,1 MWp + BESS 3,4 MWh
Location                Bangka Belitung Islands
                                                  Location      Bangka Belitung Islands   Location      Bangka Belitung Islands
Contract Duration       25 Years

COD                     January 2018




Source: Company Data
Notes:
Page 6
  Kinerja
Operasional



02            www.kencanaenergy.com
Page 7
 Kinerja Operasional: Produksi

Produksi Listrik (GWh)
                                                                                                                   •   Produksi listrik KEEN di 2025
      PLTA Pakkat                PLTA Air Putih       PLTM Ma'dong          PLTM Ordi Hulu                             meningkat dibandingkan 2024

                                                                                                           376,3   •   Masing masing PLTM mengalami
                                                                                             367,8   +2%
                                                                                                                       peningkatan sebesar sekitar:
                                                                                                                         •    Madong = 13,6%
                                                                                             51,9          62,6
                                                                                                                         •    Ordi Hulu = 20,5%
                                                          311.9                     +32%
                                                                     -11%                                          •   Masing masing PLTA mengalami
                                                   +23%                     278.3                                      penurunan sebesar sekitar:
                                                           65,3                              73,6
                                                                                                           83,6          •    Pakkat = 11,3%
                                           252.7
                                                                             56,5                                        •    Air Putih = 0,3%
                                  +18%
                         213.7


                                           154,6          142,7                              138,0
             +105%       110,1                                              118,7                          137,6


    103.9



     103,9               103,6              98,1          103,9             103,1            104,3         92,5



     2019                2020              2021           2022              2023             2024          2025


  Source: Company Data
  Notes:
                                                                                                                                                       7
Page 8
Kinerja Operasional: Konstruksi PLTM Salu Noling

 Progress Konstruksi               Realisasi Capex                                     Proyeksi Produksi Listrik (GWh)

                                                       0,55%


          18,2%



                                                                                                                     63,6      63,6      63,6
                                                 Total Capex
                                          24,5 USD mn
                                                                                                          31,8
                                                                                      X          X
                                                                91,45%                0          0
                        81,8%
                                                                                     2024       2025      2026      2027       2028      2029

                                   Belum
             Ongoing   Completed                          Terealisasi
                                   Terealisasi


                                                  PLTM Salu Noling merupakan proyek terbaru KEEN.
                                                  Per akhir bulan Desember 2025, konstruksi proyek PLTM Salu Noling sudah mencapai ~82%.
                                                  Progres konstruksi masih sesuai rencana, dan PLTM Salu Noling direncanakan untuk COD pada Juni
                                                  2026. Setelah COD, PLTM Salu Noling akan berkontribusi sebesar 56.9 GWh setiap tahun kepada
                                                  total produksi Kencana Energy.

Source: Company Data
Notes:
                                                                                                                                                   8
Page 9
 Kinerja
Keuangan



03         www.kencanaenergy.com
Page 10
Kinerja Keuangan: Ringkasan

           Pendapatan (USD mn)                  EBITDA (USD mn) & EBITDA Margin
                                                    24,3         25,3
                           48,0
                                                   58,0%                                      51,9%
                 41,8                                                             48,2%
                                  37,9                           52,8%                    17,8
                                         34,3                                 18,2




                 2022      2023   2024   2025       2022         2023         2024        2025



           Laba Bersih (USD mn)                 Rasio Hutang Terhadap Ekuitas (x)
                 14,4      14,8
                                                                 0,88



                                         9,1                                   0,83
                                  7,5               0,81

                                                                                           0,78




                 2022      2023   2024   2025      2022          2023         2024         2025


Source: Company Data
Notes:
                                                                                                      10
Page 11
Kinerja Keuangan: Ringkasan




        Installed Capacity (MW)                                                                                   Sales of Electricity (USD mn)
                                                                                                        79,5
                                                                                                69,5
                                                                                 65,4                                                                                30,50
                                                                                                                                                             30,00
                                                  54,0            55,4                                                                       26,20   25,90
                                                                                                                                     21,1
                    39,0           39,0                                                                                      17,1

     18,0                                                                                                            8,3



     2019           2020           2021           2022           2023            2024           2025   2026 (F)      2019    2020    2021    2022    2023    2024    2025




Source: Company Data
Notes: The Salu Noling Project is targeted to achieve Commercial Operation Date (COD) in Q2 2026.
                                                                                                                                                                             11
Page 12
 Hasil Penjualan Renewable Energy Certificate (REC)

Apa itu Renewable Energy Certificate (REC)?                                                Volume Penjualan REC (MWh1)

“REC adalah instrument hukum yang diterima dan digunakan untuk mendukung klaim
pembangkitan dan penggunaan energy terbarukan di pasar Listrik terbarukan.’

                                                                                                                                     277.894
                                                                                                                                                       197.153           167.713
                                                                                                                   126.060
                                                                                                 92.000

                                                                                                  2021              2022              2023              2024              2025

                                                        Tanpa REC                          Pendapatan Penjualan REC (USD2)

                                                                        Tidak bisa klaim
            Non EBT                                                      menggunakan
                                                                              EBT                                                    277.075
                                                                                                                                                       178.227           187.808
                                                                                                                   119.141
                                                                                                 72.750
                                                     Jaringan Listrik
                                                                                                  2021              2022              2023              2024              2025


                                                                                           •   KEEN telah berhasil menjual REC dari tahun 2021.
                                                                                           •   Perdagangan REC memiliki potensi besar di Indonesia dengan pertumbuhan minat pasar
                                                                         Klaim bahwa
                                                                                               yang baik akan atribut hijau untuk sumber tenaga listrik energi terbarukan.
             EBT                                                         menggunakan
                                                                                           •   Untuk tahun ini dan kedepannya, Perseroan berharap bahwa penggunaan REC akan terus
                                                                             EBT
                                                             REC                               meningkat seiring dengan meningkatnya kesadaran lingkungan di seluruh dunia.




  Source: Company Data, ICDX, SP Group
  Notes: 1) 1 REC = 1 MWh electricity generated by the Company                                                                                                                      12
         2) assumes exchange rate of IDR 16,000 per USD 1
Page 13
Peristiwa
 Penting



04          www.kencanaenergy.com
Page 14
Bencana Sumatera Utara

Salah satu PLTA milik KEEN, yaitu PLTA Pakkat, terdampak bencana banjir dan longsor di Sumatera Utara yang mengakibatkan kerusakan pada bangunan
powerhouse. Aset PLTA Pakkat sepenuhnya di cover oleh Asuransi. Manajemen KEEN juga sudah berkomunikasi dengan PLN untuk memperpanjang
kontrak karena force majeure, dan juga untuk meminta keringanan dari pihak bank yang mendanai proyek.


 •    Pada tanggal 3 Deccember, ada batu batu yang
      jatuh dari lereng. Manager lokasi langsung
      mengevakuasi staf dari bangunan powerhouse

 •    Sekitar jam 14.30, terjadi longsor yang relative
      besar, yang membentuk bendungan alami yang
      membendungi aliran Sungai

 •    Longsor tersebut juga mencapai bangunan
      powerhouse

 •    3 hari setelahnya, bendungan alami yang
      disebabkan oleh longsor meluap, dan aliran sungai
      mengenai powerhouse




 Source: Company Data
                                                                                                                                                   14
Page 15
Penandatanganan PPA PLTS Tobelo, 10MW


                                        KEEN telah berhasil menandatangani PPA
                                        baru dengan PLN untuk sebuah PLTS dengan
                                        kapasitas 10MW, dengan BESS 8MW.
                                        Rencananya, tahap konstruksi untuk PLTS
                                        tersebut akan dimulai pada kuartal 2 tahun
                                        2026, dan akan selesai dalam waktu kurang
                                        lebih satu tahun.

                                        Setelah selesai, PLTS Tobelo akan
                                        menghasilkan listrik sekitar 20,400 MWh* per
                                        tahun.




Source: Company Data
Notes: *) Berdasarkan ECE                                                              15
Page 16
Rencana
ke Depan



04         www.kencanaenergy.com
Page 17
 Rencana ke Depan: Prospek Pasar

Konsumsi Listrik Per Capita Negara ASEAN (kWh/Capita)                            Bauran Listrik Indonesia




                                                                                          15,75%
                                                                                                                                                        26,40%

                                                                                                                                              Target
                                                                                                2025
                                                                                                                                               2060

                                                                                                                                     73,60%
                                                                                                      84,25%

                                                                      9.576
            PEER AVERAGE
                                                                                 •   Sebagai negara ASEAN dengan ekonomi terbesar, Indonesia masih jauh di
                4.272
                                                                                     belakang negara ASEAN lain dalam ketersediaan Listrik

                                                           5.086                 •   Dengan konsumsi rata rata per capita 1,411 kWh per tahun, Indonesia masih
                                                                                     butuh meningkatkan ketersediaan Listrik sebesar tiga kali lipat untuk mencapai
                                      2.766     3.032                                rata-rata konsumsi negara ASEAN di 4,261 kWh
                          1.411
      900                                                                        •   Indonesia juga memiliki target menaikan porsi EBT dari total bauran lsitrik, dari
                                                                                     sekitar 15.7% di 2025 ke 73.6% di 2060
    Filipina             Indonesia   Vietnam   Thailand   Malaysia   Singapura


  Source: Company Data
                                                                                                                                                                         17
Page 18
Rencana ke depan: Prospek Pasar

    Rencana Untuk Penambahan Tenaga Listrik (RUPTL) Tahun 2021 - 2030                            Rencana Untuk Penambahan Tenaga Listrik (RUPTL) Tahun 2025-2034

                                                            3%      Bio-Energy                                                                                    2%    Bio-Energy
                                                       3%           Wind
                                                            6%      Mini Hydro                                                                                  17%     Wind

                                                       17%          Geothermal                                                                                    1%    Nuclear
                                                                                                                       Storage
                                                                                                                                                                 12%
                                                                                                                       10,3 GW                                          Geothermal
                                                                                                                        (15%)
                                                       24%          Solar PV
               Non-Renewable        Renewable
                   Energy             Energy                                                                 Non-Renewable        Renewable                      40%
                                     20,9 GW                                                                                       42,6 GW                              Solar PV
                  19,7 GW                                                                                        Energy
                   (48%)              (52%)                                                                     16,6 GW             (61%)
                                                                                                                 (24%)
                                                       47%          Hydro

                                                                                                                                                                 28%
                                                                                                                                                                        Hydro




    Target dan Realisasi Kapasitas Pembangkit EBT Indonesia

                                                                                 326,0
                                                                                                                                                                       284,0


                                          72,0
              7,6            11,7                1,5         17,1                                      2,7            5,2        18,0         4,3         8,6

                         Hydro                              Solar                                              Geothermal                           Other Renewable
                                                                      Realisasi 2025     Target 2034    Target 2060


Source: Company Data, ESDM
                                                                                                                                                                                     18
Page 19
     Rencana Penambahan Pembangkit 2025 - 2034
15
           5 Tahun Pertama                             27,9 GW       5 Tahun Kedua                          41,6 GW
       Fosil : 12,7 GW (45%)                                         Fosil : 3,9 GW (45%)
13     EBT : 12,2 GW (44%)                                           EBT : 30,4 GW (44%)
       Storage : 3,0 GW (11%)                                        Storage : 7,3 GW (11%)
                                                                                                     12,2

11
                                                                                                      2,9
                                                                                       9,6
                                                                                              9,1
9
                                                                                                      1,6

                                   7                                                    4,4
                                                                                              2,8
7
                                   0,4
                                                                         6,5
           5,5
                                   0,4
                                                              5,7         0,8
                                                                                              0,9     3,9
5           0,8
                                   1,6          4,8           0,6
                                                              0,3         1,3                                  4,5
            0,8
                            4      0,3
                                                              1,1
                                                                                        0,9
                                                                                              2,1
                                                                                                                0,8
     0,1                                        1,8
                            0,6                               0,3         1,7                         0,3              Air*
                            0,4                         0,1                                                      1
3                                                                                       2,3   0,3                      Angin
                                                0,5                                           0,6     1,8
                             1                                            0,3                                          Surya
                                   4,3                                    0,6                                   1,2
            3,8      0,1                                      3,3                                                      Nuklir
                                                1,5
                                                                                        1,3   2,4                      Bioenergi (Biomassa, Biogas, Sampah)
1                           1,9           0,2                             1,8                         1,7
                                                0,3                                                             1,5    Panas Bumi
                                                0,5                                     0,7                            Batubara, BBM, Gas, Baterai

            2025           2026    2027         2028          2029        2030         2031   2032   2033       2034
-1
      Source: Company Data, ESDM
                                                                                                                                                              19
Page 20
Rencana ke Depan : Kapasitas Pembangkit Listrik Indonesia
9,5                                          3,5                                                  7,7
 GW          Sumatera                                     Kalimantan                                        Sulawesi
                                             GW                                     Satuan : MW
                                                                                                  GW                           Satuan : MW
                               Satuan : MW
         PLTA/M              4.940                   PLTA/M                      1.533                 PLTA/M                    4.606

                                                      PLTBio                                             PLTP                      305
             PLTP            2.017                                                 79

                                                          PLTN                    250                   PLTBio                     236
           PLTBio              60

             PLTN             250                           PLTS                 1.524                   PLTS                    1.530

             PLTS            1.606                          PLTB                   70                    PLTB                    1.010

                                                                                                                                             2025 - 2029
                                                                                                                                             2030 - 2034
                                                                   2,3       Papua, Maluku, Nusa
   19,6 Jawa Madura Bali                                           GW        Tenggara
      GW                                                                                                   Satuan : MW
                                                                                                                              Total
                                              Satuan : MW              PLTA/M                                    179
       PLTA/M                                      432
                                                                          PLTP                                   332     Penambahan EBT
           PLTP                                   2.503                 PLTBio                                   141

        PLTBio                                     399                    PLTS                                1.470

           PLTS
           PLTB
                                               10/932
                                                  5.377
                                                                          PLTB
                                                                         PLTAL
                                                                                                                 140
                                                                                                                  40
                                                                                                                          42.6GW

Source: Company Data, ESDM
                                                                                                                                                           20
Page 21
Rencana ke Depan: Rencana Ekspansi Perseroan

KEEN telah menyiapkan pipeline proyek yang luas dari sumber alam yang beragam, siap untuk berpartisipasi dalam
pengembangan EBT Indonesia dengan bekerjasama dengan PLN, dan Perseroan selalu aktif berpartisipasi dalam proses
pengadaan PLN dalam tipe EBT yang beraneka-ragam.




          Hydro             Surya              Bayu             Biomasa / Biogas             Tender Berjalan:
                                                                                               PLTA: 180+ MW
                                                                                               PLTS: 16+ MW

 250+ MW                60+ MW 162+ MW                           20+ MW                     180+ MW

 Source: Company Data
                                                                                                                   21
Page 22
Sustainability



 05              www.kencanaenergy.com
Page 23
Jejak Karbon Kami



                              KEEN GHG Inventory 2025
                              Kami selalu melihat kedepan dan berupaya untuk membawa masa depan yang lebih
                              hijau




   Scope 1+2 intensity                     Scope 3                Biogenic               Avoided emissions




   0.0026
                                           32,839.65 tCO2e        33,813.69 tCO2e        362,360.67 tCO2e
   tCO2e/MWh




Source: Insolity Consulting
                                                                                                             23
Page 24
 Sustainable Development Goals

     SDG                         Tujuan                         Target                                     Strategi

                         Mengurangi kemiskinan melalui   Mendukung kebutuhan dasar       •   Bantuan sembako dan santunan masyarakat.
                          peningkatan kesejahteraan        dan ketahanan ekonomi         •   Dukungan bagi warga terdampak musibah.
                                 masyarakat.                    masyarakat.              •   Program bantuan langsung ke desa sekitar.


  No Poverty

                            Memastikan kehidupan                                         •   Penerapan peraturan kesehatan dan
                          yang sehat dan mendukung       Mitigasi dan nihil kecelakaan       keselamatan kerja (K3) secara ketat.
                           kesejahteraan bagi semua                  kerja.              •   Sosialisasi berkesinambungan K3 kepada
                           manusia dan semua usia.                                           karyawan.
 Good Health

                                                                                         •   Dukungan kegiatan sosial yang inklusif.
                            Mendorong kesetaraan          Meningkatkan partisipasi
                                                                                         •   Keterlibatan perempuan dalam program
                          peran dalam kegiatan sosial    perempuan dalam kegiatan
                                                                                             masyarakat.
                                 masyarakat.                    komunitas.
                                                                                         •   Kesempatan partisipasi tanpa diskriminasi.
Gender Equality
  Source: Company Data
                                                                                                                                          24
Page 25
  Sustainable Development Goals

      SDG                         Tujuan                           Target                                       Strategi
                                                                                             •   Perseroan menyediakan energi yang bersih dan
                                                                                                 terjangkau.
                           Memastikan akses terhadap        Meningkatkan aksesibilitas       •   Diversifikasi lini bisnis yang dapat menghasilkan
                          energi yang terjangkau, dapat    dan manfaat energi listrik dari       listrik dari sumber energi baru terbarukan (EBT)
                          diandalkan, dan berkelanjutan.        energi terbarukan.               seperti biogas, tenaga angin, dan tenaga surya.
                                                                                             •   Memperluas cakupan area pelayanan dan konsisten
 Clean Energy                                                                                    terus mencari lokasi baru.



                                                             Meningkatkan aktivitas          •   Dukungan kegiatan ekonomi dan komunitas lokal.
                            Mendorong pertumbuhan
                                                            ekonomi dan produktivitas        •   Sponsorship kegiatan olahraga dan event daerah.
                           ekonomi lokal yang inklusif.
                                                                 masyarakat.                 •   Pemberdayaan masyarakat sekitar operasional.

Economic Growth

                                                                                             •   Perbaikan jalan dan fasilitas umum.
                            Mendukung pembangunan              Peningkatan kualitas
                                                                                             •   Dukungan sarana prasarana desa.
                           infrastruktur dan operasional      infrastruktur di wilayah
                                                                                             •   Penyediaan peralatan pendukung masyarakat.
                                   berkelanjutan.                   operasional.

   Innovation
   Source: Company Data
                                                                                                                                               25
Page 26
  Sustainable Development Goals

       SDG                        Tujuan                       Target                                  Strategi

                                                            Peningkatan kualitas      •   Perbaikan jalan dan lingkungan desa.
                           Mewujudkan lingkungan dan
                                                          lingkungan dan fasilitas    •   Bantuan fasilitas umum.
                          komunitas yang berkelanjutan.
                                                                masyarakat.           •   Dukungan kegiatan sosial kemasyarakatan.

Sustainable Cities
                                                                                      •   Penerapan metode Run of River, penggunaan
                                                                                          aliran air hanya untuk menggerakkan turbin
                              Mengambil aksi untuk
                                                                                          serta memasok generator dalam menghasilkan
                          menangani perubahan iklim dan   Mitigasi dan nihil emisi.
                                                                                          energi listrik.
                                 dampaknya.
                                                                                      •   Evaluasi kegiatan operasional untuk mencapai
                                                                                          tujuan nihil emisi.
 Climate Action

                                                                                      •   Pengelolaan lingkungan sekitar operasional.
                                                           Meminimalkan dampak
                           Menjaga kualitas lingkungan,                               •   Pencegahan pencemaran air.
                                                          lingkungan dari aktivitas
                           termasuk ekosistem perairan.                               •   Dukungan kegiatan peduli lingkungan.
                                                                operasional.

Life Below Water
   Source: Company Data
                                                                                                                                        26
Page 27
Sustainable Development Goals

    SDG                       Tujuan                        Target                                Strategi
                                                                                  •   Konsisten melakukan studi kelayakan dan
                                                                                      analisis dampak terhadap lingkungan.
                                                                                  •   Meminimalkan luas wilayah yang terdampak dan
                         Melindungi, menjaga, dan     Melindungi, menjaga, dan
                                                                                      tidak ada mesin yang menghasilkan emisi
                        mendukung ekosistem darat.   mendukung ekosistem darat.
                                                                                      melalui penerapan metode Run of River.
                                                                                  •   Pemetaan keberadaan ekosistem
Life on Land                                                                          keanekaragaman hayati di sekitar proyek.




 Source: Company Data
                                                                                                                               27
Page 28
Terima Kasih



               www.kencanaenergy.com

File

File Open PDF
Source IDX
Size4.05 MB
Published28 Apr 2026
Pages28
Characters40,848
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 2 people and organisations named in the text · linked when the evidence is strong

linked org Kencana Energi Lestari Tbk p.1 ×8
unresolved org PT Paramita Other Shareholders p.3

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

Other files in this announcement 1

↑↓ select ↵ open ⇧↵ see every result